Contract Change Order No. 2
Project Title: FY 2020-21 Residential Slurry Seal Project #1202 Owner. City of Placont1i Gonlractor: flu M lla 5 WO/ Seal You are hereby directed to make the herein described changes from the plans and specifications or to do the following described work not included In the plans and specifications on this contract:
Description of work done, estimate of quantities and prices to be pald. 1 This Change Order provides:
a) Extra work and credits identified in Exhibit A
04,876.30
2 This Change Order came about from:
a)
Adjustments to bid Nem quantities.
3 Action to be taken:
a) The Contractor was directed to provide a lump sum price for this change. 4 Compensation
e) Adjustment of Line Items exceeding 25% $
b) Extra work $ 94,676 30
d) Credits
Total $ 94.876.30
5 Contract Time Extension
a) 0
In addition to work specified in the bid specifications, this change order includes all extra work, field adjustments and credits. This work Is an Contractor Initiated change and includes all labor, equipment, materials, and supervision and Adminstratlon.
CHANGE TO CONTRACT COST: CHANGE TO CONTRACT TIME:
Contract Amount $ 568,281.29
Previous CCOs: $ 42,609,00
Adjustment of Line
Items Exceeding 25%
Total Extra Work $ 84,876.30
Total Field Adjustments
Total Credits
Changes In Line Items:
Current Contract price:
Prepared by:
Recommended'
Recommended:
Approved by:
$
137,485.30
5,766.59
Kevin y•ra, P bJ orks
i
Masou4Sepahj( y`
'7(7/2.— ____
or, City of Placentia
7I71li
—7 111,17,
t Placentia l
Luis Estevez4 putY dminislrator, City Of Placenti
Y'Lr �(I�7/
Damien R. Arrula, City Adn#nistrator, City Of Placentia We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal, is approved, that we will provide all equipmenl.fur . sh all materials, except as may otherwise be shown above
Accepted:
Martin, tlefig
//h, 7- 7 .2
Marlin lur Seal
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the lime therein specified.
No.
CCO No. 2 Exhibit 'A'
Project Title: FY 2021-21 Residential Slurry Seal Project Owner: City of Placentia Contractor: Doug Martin Slurry Seal Description
This additional amount from C/O 1 to pave Madison@
1 Bradford. The initial SF was an emergency repair quote. The additional footage added as part of final repair.
2 During removal of the sidewalk this drive way approach at 1009 Goldenrod was inspected and decided that it nedded to be replaced due to excessive root intrusion. This repair was additional.
Type $$I Hr Rate Total EXTRA
385 $F $ 6.80 $
2,482.00 $ 2.482.00
85.5 SF $ 13.50 $ 1,154.25 51,154.25
During the job walk this cross gutter at Pinehurst and Cherry Hills was inspected and decided that it needed to be
3 replaced. This repair was additional. 264 SF $ 18.OD S 4,752.00 $ 4.752.00 This amount is for additional areas of curb and gutter that 4 were added and exceeded initial bid quantities 225 LF $ 68.00 $ 15,300.00 $ 15,300.00 This amount is for additional areas of sidewalk that were 5 added and exceeded initial bid quantities. 104 SF S 9.45 $ 982.80 $ 982.80 t nts quanmty is or gnna aria ovenay repairs tnat were
6 rtone instead of 4` deep lift ren*. 5655 SF S 8.75 $ 49,481.25 S 49,481 25 This additional amount is to repair areas within the Slurry Seal Project area where microtrenching created a trip
hazard. The process is a micro mit the edges at the gutter to 7 eliminate this hazard. 4400 SF $ 2.83 $ 12.452.00 $ 12.452.00 This additional amount is to reapply a Type 11 TRMSS (Tire Rubber Modified Surface Sealer) to complete the restoration process. This is a very thin application to match exsisting 8 condtions in these areas. 4400 SF $ 1.88 $ 8,272.00 $ 8,272.00 Sum of Line Item Adjustments $ 94,876.30