k)s7GST
IT & AV Solutions for a Connected World
GST STATEMENT OF WORK:
Rosanna R City of Placentia_Police Dept_08192021
City of Placentia
Rosanna Ramirez
[email protected]
Quote # 101400
Version 4
Wednesday, June 29, 2022
Golden Star Technology
Min Joo
Email: [email protected]
Phone: (562) 345-8744
12881 166th Street
Cerritos, CA
GSTES.COM 800.833.0128
'GST
IT & AV Solutions for a Connected World
GSTINC.COM 800.833.0. 8
Rosanna R City of Placentia_Police Dept_08192021
Prepared by:
Golden Star Technology
Min Joo
[email protected]
(562) 345-8744
offr IT Statement of Work
SUMMARY
Prepared for:
City of Placentia
Rosanna Ramirez
[email protected]
401 E. Chapman Ave
Placentia, CA 92870
Quote Information:
Quote #: 101400
Version: 4
Delivery Date: 06/28/2022
Expiration Date: 07/29/2022
The solution implementation will tackle all facets of the Police department environment's refresh...Compute, Storage, Storage related networking, Veeam upgrade, on premise and Cloud based backup...The goal of the project is to ensure the Production data lives in an agile, supported, performance driven and resilient environment. The following refresh areas will be worked on. • Compute refresh...
o A 3rd server/ESXi host will be added to the existing 2 * ESXi VMware cluster yielding a High Availability cluster and enabling the Production Cluster to maintain redundancy in case of a host/server failure • Storage refresh...
o Existing End of Support MD3800i production SAN array will be replaced with a new modern, scalable, and resilient Nimble SAN array hosting Police department's production workloads • Storage based Networking refresh...
o Introducing couple of 1/10/25GB switches enabling the Production compute, storage, and backup devices to connect and share fast and resilient network
• On Premise Backup...
o Introducing a scalable, resilient, and fast Disk backup appliance. Appliance will store/backup workloads on -premises providing a second copy of the Police department's production data • Cloud Backup...
o Adhering to the 3-2-1 backup best practice a 3rd copy of the backup will be backed up to the Cloud in case the Police department's production site becomes inaccessible
• Veeam upgrade...
o Existing End of Support Veeam 9.5 will be upgraded to the current Veeam 11 Implementation of the solution will cover Compute, storage, networking, virtualization and on -premises and Cloud backups Task List — Networking
• Rack and stack the SN2410M 24 ports switches
• Configure the switches
• Ensure connection of Storage, Compute and Backup devices to ToRswitches is successful Quote #101400 v4 Page: 2 of 14
'GST
IT & AV Solutions for a Connected World
1 GSTINC.CO 800.
Task List — Storage —
• Rack and Stack Nimble array
• Connect Management & Data ports to Network switches
• Setup and initialize nimble array
Tasks List — Compute —
• Install and Setup new DL360 Gen10 server
• Connect ILO and Data ports to Network switches
• Install VMware vSphere 7.x Enterprise Plus edition on server • Install vCenter server Standard edition
Tasks List — Virtualization -
• Unjoin existing vCenter server Essential Plus edition • Install new vCenter server Standard edition
• Add existing 2 hosts to the new vCenter server Standard • Upgrade Essential Plus to Enterprise Plus edition
• Add new server - DL360 Gen10 - to the new cluster making it a 3 hosts' cluster • Ensure Nimble array successfully provision storage to hosts in the VMware cluster Tasks List — Data migration -
• Connect new server to both arrays via 10Gb connection • Enable VMware storage vMotion to initiate data migration of VMs hosted on MD3800i array's datastores to new datastores on Nimble array from new Enterprise Plus cluster
• Initiate the migration process
• With Migration successfully completed and VMs hosted on Nimble array disconnect Enterprise Plus VMware cluster from MD3800i and allow production workloads to be supported by the new Nimble Tasks List — On Premise Disk backup appliance —
• Rack and Stack StoreOnce Dedup appliance
• Connect 10Gb adapters' ports to the Switches
• Initialize and setup the appliance - Setup and initialize Catalyst Store - • Leverage Veeam Backup & Replication to design and schedule a backup/recovery for the on -premises backup project • StoreEasy will be designated as the Disk backup target and will host Full and Incremental backup schedule of the Police department data
Tasks list — Cloud backup hosted by iLand —
• Veeam will be configured to send a backup copy of the Police department's data to the cloud based on defined retention policy
• GST will collaborate with iland cloud provider on the success of the Cloud backup project Tasks list — Veeam upgrade -
End of support Veeam 9.5 will be migrated to Veeam 11. Socket based licensing will be replaced by Universal Subscription licenses whereby on -premises and cloud based VMs are treated identically
CUSTOMER REQUIREMENTS
Quote #101400 v4 Page: 3 of 14
'GST
IT & AV Solutions for a Connected World
GSTINC.CO , 800.
ENERAL RESPONSIBILITIES
• Coordinate the preparation of any hardware and/or software that is not included for this project. Ensure that existing hardware is fully functional and software/firmware is updated. • Assure that the environment is 100% ready. If the environment is not 100% ready the scheduling of the implementation will not be finalized until it is.
• Customer is responsible for providing 24 hours or greater advanced notice for the rescheduling or cancellation of GST's onsite engineering services. If less than 24 hours is given the customer will be charged a half day of GST's engineers time at $200/hr.
• Coordinate service deployment on third -party maintained hardware/software (if applicable). • Assign a designated person from the Customer's staff who, on behalf of the Customer will grant all approvals, provide information, and otherwise be available to assist GST to facilitate the delivery of this service. • Ensure that all hardware, firmware, and software that the GST engineer will need in order to deliver this service are available.
• Allow GST full and unrestricted access to all locations where the service is to be delivered. • Provide a suitable work area for delivery of the service, including access to an outside telephone line, power, any network connections, etc. that is required.
• Be responsible for all data backup and restore operations • Provide one point -of -contact that will finalize decisions during the project. • Provide necessary documentations, paperwork, schematics, line drawings, and information for GST to complete the project. Any delays in providing the necessary project documentation will delay the project.
SERVICES TERMS AND CONDITIONS
NON -COMPETE CLAUSE
GST assigns service professionals with qualifications commensurate with tasks listed in this scope of work. If the customer, directly or indirectly, contracts with or hires any GST employee engaged in providing services to the customer under this agreement or any other agreement, written or oral, GST will have the option of negotiating a change in the cost and/or time to deliver or charge the customer the equivalent of 30% of the employees' annual salary as a finder's fee. This clause is applicable for a period of up to ninety days from the last date of services rendered by a GST employee to the customer.
TIME RECORDS
Each employee, either directly employed by GST or a subcontractor (hereinafter called "GST employee") will present a time record to the customer setting forth the hours worked. An authorized representative of the customer must countersign the record and will thereby certify that such time is correct and that the work was performed in a satisfactory manner.
NORMAL BUSINESS HOURS
GST service hours are 8:00 am to 5:00 pm Monday through Friday. Overtime (over 8 hours in one day), scheduled after hours and weekends are charged at time and one-half of contracted service rate. Emergency after hours, weekends and holidays are charged at two times contracted service rate. Customer is responsible for providing 24 hours or greater advanced notice for the re -scheduling or cancellation of GST onsite engineering services. If less than 24 hours is given the customer will be charged a half day of GST engineering time at $200/hr.
TERMINATION TERMS
Client may terminate work under this Statement of Work, in whole or in part, at any time by 30 day written notice. Such notice shall state the extent and effective date of such termination. Upon receipt thereof, GST shall, to the extent directed by the Client or its designees, stop work under this agreement. If the agreement is so terminated for convenience, GST shall be paid in accordance with the terms of the order for only those materials or supplies delivered and accepted.
COMMENCEMENT OF WORK
Work shall not commence under the Contract until a fully executed agreement has been received by GST and GST has been given approval to proceed by customer.
DATA LOSS
Quote #101400 v4 Page: 4 of 14
'GST
IT & AV Solutions for a Connected World
GSTINC.COM 800.
GST make no guarantee against data loss during services engagements. It is the customers responsibility to ensure data is properly protected (backed up) before the engagement begins.
PRODUCT RETURNS
Standard stock items purchased from GST may be returned for any reason within (14) fourteen days. Custom orders are non -returnable and non-refundable. All original packaging, accessories and documentation must accompany the item and be in unmarked condition. Items must be shipped via at least 2nd day freight with insurance for the full value of the item.
Returned items are subject to a 25% restocking fee. Though rare, a customer may need to return a defective product.
Defective product returns are not subject to the 25% restocking fee and will be exchanged in accordance with the manufacturer's policy within 30 days of purchase.
PROJECT DELAYS
Delays due to client configuration specifications, hardware delivery, carrier availability, and facility access, physical or environmental delays are subject to change orders as billable delays. These delays can also impact project timeline and deadlines.
PREVAILING WAGE CLAUSE
GST holds the right to charge the customer additional services fees if the project is deemed to have prevailing rates of wages requirements prior, during, or after project completion. GST adheres and complies with the provisions of the California Labor Code. All workers employed on public works projects must be paid the prevailing wage determined by the Director of the Department of Industrial Relations, according to the type of work and location of the project. The prevailing wage rate is the basic hourly rate paid on public works projects to a majority of workers engaged in a particular craft, classification or type of work within the locality and in the nearest labor market area (if a majority of such workers are paid at a single rate). If there is no single rate paid to a majority, then the single or modal rate being paid to the greater number of workers is prevailing.
GST SERVICES WARRANTY
QUALITY OF SERVICES
GST warrants that its Services will be of professional quality (performed in a good and workmanlike manner) and will conform to generally accepted industry standards for such Services and to the requirements specified in this SOW. GST's personnel shall be competent and qualified to perform the tasks to which they are assigned. In the event of any breach of this warranty, GST, at its sole expense and without delay, shall re -perform the non -conforming Services to the applicable standard.
WORKMANSHIP WARRANTY
GST certifies that all equipment and materials furnished shall carry a ninety (90) day warranty on parts. GST guarantees to furnish any qualified personnel (during normal business hours, Monday to Friday, 8:00 am to 5:00 pm) to the installation site for the period of one (1) year from the date of installation to repair or replace defective items installed or provided by GST exclusively. If the item is determined to not be defective, GST will charge the customer for all time spent on the incident at a rate of $175/hour. Determination if item is defective or was changed, damaged, reconfigured, or altered by non GST personnel is under sole authority of GST. Any change, alteration, damage, or reconfiguration by non GST personnel voids one (1) year warranty. No response timeframe SLA guaranteed for warranty work. Further, all equipment purchased from GST in our installed system is subject to a manufactures warranty. Further, all equipment purchased from GST in our installed system is subject to a manufacture warranty. GST will not honor any other warranty, implied or otherwise. In no event shall GST be liable, or in any way responsible for damages, or defect in the system, which were caused by neglect, vandalism, misuse, environmental damage or by repairs or attempted repairs performed by anyone other than a GST service technician. Nor shall GST be liable or in any way responsible for any incidental or consequential economic or property damage.
CHANGE MANAGEMENT
Quote #101400 v4 Page: 5 of 14
'GST
IT & AV Solutions for a Connected World
GSTINC.CO 800.
GST establishes change management procedures to document changes that are made to the baseline project identified in the Statement of Work. These procedures are in place to reduce the potential for cost and schedule variances.
Customer is responsible for providing 24 hours or greater advanced notice for the re -scheduling or cancellation of GST engineering services. If less than 24 hours is given the customer will be charged a half day of GST engineering time at $200/hr.
If a change needs to be made to the project, which is not included in the SOW or differs from the SOW, GST or the client must complete the Change Management Request form. GST will review the completed form and provide an estimate to complete the request. Client must approve the additional hours/costs in order to complete the request.
In the event a change requested by the customer reduces the amount of work and the project is a firm fixed priced project, the full amount of the project will be invoiced.
A change occurs when GST encounters any of the following situations during project delivery:
1. Either party identifies new requirements not included in the original project's scope
2. Either party makes suggestions that would improve the proposed system but are not necessarily required to address the project requirements; such suggestions are incorporated into a subsequent project phase
3. Either party changes the direction and intent of this project, which requires GST to rework the solution design or services
Changes in the scope of work defined in this Statement of Work are only effective if both the customer and GST agree to them in a written document setting forth the modifications and any changes to the delivery schedule and payment terms.
GST TRAINING OVERVIEW
GST will provide a one-time, 1 hour maximum training session for end users and information technology (IT) staff. GST will review basic system functionality and operations. This will include demonstrations of features and settings. GST's technician or engineer who is familiar with the system shall lead this training. This training does not include in-depth training on hardware, software, or applications. This training does not cover any customer provided equipment, software, or applications. Any additional training or knowledge transfer requested by the Client may require training to be provided by the manufacturer. Any additional training may require additional costs and fees. GST will also provide all user manuals and manufacturer training materials as the project deliverables.
Quote #101400 v4 Page: 6 of 14
'GST
IT & AV Solutions for a Connected World
1 GSTINC.CO 800.
Hardware - Compute Storage Networking & On premise Backup Item
Description
Qty Price Ext Price Tax
1 867959-B21
HPE DL360 Gen10 8SFF CTO Server
2 867959-B21#ABA HPE DL360 Gen10 8SFF CTO Server
3 P02607 -L21 Intel Xeon -G 6230 FIO Kit for DL360 G10
4 P02607 -B21 Intel Xeon -G 6230 Kit for DL360 Gen10
5 P02607-B21#0D1 Factory Integrated
6 P38446 -B21 HPE 32GB 1Rx4 PC4-2933Y-R Smart Kit
7 P38446-B21#0D1 Factory Integrated
8 P18420 -B21 HPE 240GB SATA RI SFF SC MV SSD
9 P18420-B21#0D1 Factory Integrated
10 P01366 -B21 HPE 96W Smart Stg Li -ion Batt 145mm Kit 11 P01366-B21#0D1 Factory Integrated
12 804331-B21 HPE Smart Array P408i-a SR Gen10 Ctrlr
13 804331-B21#0D1 Factory Integrated
14 P08440 -B21 HPE Eth 10Gb 2p 537FLR-SFP+ Adptr
15 P08440-B21#0D1 Factory Integrated
16 871244-B21 HPE DL360 Gen10 High Perf Fan Kit
17 871244-B21#0D1 Factory Integrated
18 865408-B21 HPE 500W FS Plat Ht Plg LH Pwr Sply Kit
19 865408-B21#0D1 Factory Integrated
20 BD505A HPE iLO Adv 1-svr Lic 3yr Support
21 BD505A#0D1 Factory Integrated
3 $2,092.00
3 $0.00
3 $2,980.00
3 $2,980.00
3 $0.00
18 $1,328.80
18 $0.00
6 $480.80
6 $0.00
3 $161.60
3 $0.00
3 $1,733.60
3 $0.00
3 $752.00
3 $0.00
3 $480.80
3 $0.00
6 $306.40
6 $0.00
3 $375.20
3 $0.00
$6,276.00 8.75%
$0.00 0%
$8,940.00 8.75%
$8,940.00 8.75%
$0.00 0%
$23,918.40 8.75%
$0.00 0%
$2,884.80 8.75%
$0.00 0%
$484.80 8.75%
$0.00 0%
$5,200.80 8.75%
$0.00 0%
$2,256.00 8.75%
$0.00 0%
$1,442.40 8.75%
$0.00 0%
$1,838.40 8.75%
$0.00 0%
$1,125.60 0%
$0.00 0%
Quote #101400 v4 Page: 7 of 14
'GST
IT & AV Solutions for a Connected World
1 GSTINC.
o10R1 :
Hardware - Compute Storage Networking & On premise Backup Item
Description
Qty Price Ext Price Tax
22 864279-B21
23 864279-B21#0D1
24 867998-B21
25 867998-B21#0D1
26 874543-B21
27 874543-B21#0D1
28 R7G23A
29 P02489 -B21
30 P00922 -K21
31 Q2P92A
32 864279-B21
33 AOK02A
34 BD514AAE
35 R7G47B
36 AF572A
37 Q6M27A
38 455883-B21
39 ROR41B
40 P9U42AAE
41 JD089B
42 JL271A
HPE TPM 2.0 Gen10 Kit
Factory Integrated
HPE 1U Gen10 Bezel Kit
Factory Integrated
HPE 1U Gen10 SFF Easy Install Rail Kit
Factory Integrated
HPE StoreEasy 1660 64TB SAS MS WS IoT19
HPE DL380 Gen10 Xeon -B 3204 Kit
HPE 16GB 2Rx8 PC4-2933Y-R Smart Kit
HPE StoreEasy 10GbE 2 -port 530SFP+ Adptr
HPE TPM 2.0 Gen10 Kit
HPE 2.0m 10A C13 -C14 Blk Jpr Cord
VMw vSphere EntPlus 1P 5yr E -LTU
HPE StoreEasy 1X60 Rec Media Kit WSIoT19
HPE 2m C13 JPN Power Cord
HPE SN2410M 24SFP28 4QSFP28 P2C Swch
HPE BLc 10G SFP+ SR Transceiver
HPE 10GBASE-T SFP+ RJ45 30m 1 pk XCVR
VMw vCenter Server Std for vSph 5y E -LTU
HPE X120 1G SFP RJ45 T Transceiver
HPE X240 100G QSFP28 1m DAC Cable
3 $94.40 $283.20 8.75%
3 $0.00 $0.00 0%
3 $60.80 $182.40 8.75%
3 $0.00 $0.00 0%
3 $112.80 $338.40 8.75%
3 $0.00 $0.00 0%
1 $17,679.20 $17,679.20 8.75%
1 $423.20 $423.20 8.75%
3 $750.40 $2,251.20 8.75%
1 $736.00 $736.00 8.75%
1 $94.40 $94.40 8.75%
6 $27.20 $163.20 8.75%
6 $5,912.80 $35,476.80 8.75%
1 $40.00 $40.00 8.75%
2 $43.12 $86.24 8.75%
2 $13,420.00 $26,840.00 8.75%
8 $673.60 $5,388.80 8.75%
4 $692.00 $2,768.00 8.75%
1 $10,156.80 $10,156.80 8.75%
3 $334.40 $1,003.20 8.75%
2 $484.00 $968.00 8.75%
Quote #101400 v4 Page: 8 of 14
'GST
IT & AV Solutions for a Connected World
1 GSTINC.CO 800.
Hardware - Compute Storage Networking & On premise Backup Item
Description
Qty Price Ext Price Tax
43 JDO97C
44 QK734A
45 HU4A6A5
46 H U4A6A5#WAG
47 HU4A6A5#R2M
48 HU4A6A5#RCD
49 HU4A6A5#ZVL
50 Q8H72A
51 Q8B88B
52 Q8B68B
53 Q8G27B
54 08J18A
55 Q8J27A
56 Q8J29A
57 R3P91A
58 HU4A9A5
59 HU4A9A5#ZET
60 HU4A9A5#ZE6
61 HU4A9A5#ZEB
62 HU4A9A5#ZED
HPE X240 10G SFP+ SFP+ 3m DAC Cable
HPE Premier Flex LC/LC 0M4 2f 5m Cbl
HPE 5Y Tech Care Essential SVC
HPE DL360 Gen10 Support
HPE iLO Advanced Non Blade Support
HPE SN2410M Storage Switch Support
HPE SE 1660/1860 WS loT 2019 Stg Support
HPE NS HF20 Hybrid CTO Base Array
HPE NS 2x10GbE 2p FIO Adptr Kit
HPE NS HF20/20C Hybrid 21TB FIO HDD Bndl
HPE Tier 1 Storage OS Default FIO SW
HPE NS NEMA 5-15 to C13 US FIO Pwr Cord
HPE NS C13 to C14 FIO Power Cord
HPE NS HF20 R2 2.88TB FIO Cache Bndl
HPE Tier 1 Storage Array Standard Trk
HPE 5Y Tech Care Essential Exch SVC
HPE NS 2x10GbE 2p Adptr Supp
HPE NS HF20 2.88TB Cache Supp
HPE NS HF20 Hybrid Base Array Supp
HPE NS HF20/20C Hybrid 21TBHDD Bndl Supp
8 $252.00
8 $91.20
1 $0.00
3 $4,739.20
3 $53.60
2 $6,849.60
1 $5,584.00
1 $46,800.00
2 $5,720.00
1 $13,200.00
1 $0.80
2 $0.80
2 $0.80
1 $24,475.20
1 $0.80
1 $0.00
2 $1,540.00
1 $3,416.00
1 $9,757.60
1 $2,304.80
$2,016.00 8.75%
$729.60 8.75%
$0.00 0%
$14,217.60 0%
$160.80 0%
$13,699.20 0%
$5,584.00 0%
$46,800.00 8.75%
$11,440.00 8.75%
$13,200.00 8.75%
$0.80 0%
$1.60 8.75%
$1.60 8.75%
$24,475.20 8.75%
$0.80 8.75%
$0.00 0%
$3,080.00 0%
$3,416.00 0%
$9,757.60 0%
$2,304.80 0%
** HPE NASPO MNNVP-134 **
Quote #101400 v4 Page: 9 of 14
'GST
IT & AV Solutions for a Connected World
GSTINC.0
1 Hardware - Compute Storage Networking & On premise Backup Item
Description
Qty Price Ext Price Tax
Subtotal:
Tax Subtotal:
Software - Cloud Backup
$319,071.84
$23,250.97
Item Description
Qty Price Ext Price Tax
1 ECS-R-S-VCCWAN iland Secure Cloud Backup Bundle with Veeam 2 ECS-R-S-VCC
Software - Veeam
iland Secure Cloud Backup with Veeam Cloud
Connect
(Per GB protected) ** Qty 475,000.00 per month
1 $0.00
$0.00
0%
12 $477.27 $5,727.24 0%
Subtotal: $5,727.24
Tax Subtotal: $0.00
Item Description
Qty Price Ext Price Tax
1 P-VBRVUL-01-
SU1YP-00
Shipping
Veeam Backup & Replication + Production Support 2
- Upfront Billing License - 10 Instance - 1 Year -
Public Sector - Veeam Universal License (VUL)
$1,722.81
$3,445.62
0%
Subtotal: $3,445.62
Tax Subtotal: $0.00
Item Description
Qty Price Ext Price Tax
1 GST -SHIPPING SHIPPING CHARGE
IT Firm Fixed Price Services
1 $0.00
$0.00 0%
Item Description
Qty Price Ext Price Tax
1 GST -SVC -FFP
Quote #101400 v4
GST Firm Fixed Priced Service
1 $17,754.11
$17,754.11 0%
Page: 10 of 14
4:461G
IT & AV Solutions for a Connected World
GSTINC.COM 800.833.0128
IT Firm Fixed Price Services
Item
Description
Qty Price Ext Price Tax
2 GST -SVC -FFP -EXP GST Firm Fixed Priced Service - Materials and Expenses
Quote Summary
$0.00
$0.00
0%
Subtotal: $17,754.11
Tax Subtotal: $0.00
Description
Amount
Hardware - Compute Storage Networking & On premise Backup Software - Cloud Backup
Software - Veeam
IT Firm Fixed Price Services
$319,071.84
$5,727.24
$3,445.62
$17,754.11
Subtotal: $345,998.81
Tax: $23,250.97
Total: $369,249.78
Quote #101400 v4 Page: 11 of 14
'GST
IT & AV Solutions for a Connected World
GSTINC.CO 800.
Terms & Conditions
THIS PRICE LIST IS A QUOTATION ONLY AND IS NOT AN ORDER OR OFFER TO SELL.
All prices and descriptions are subject to change without notice. No contract for sale will exist unless and until a purchase order has been issued by you and accepted by Golden Star Technology Inc. ("GST"). Acceptance by GST of any offer is expressly conditioned upon your assent to the Terms and Conditions of Sale set forth in GST's invoices.
The prices contained in this list may not be relied upon as the price at which GST will accept an offer to purchase products unless expressly agreed to by GST in writing. Products quoted were selected by GST based on specifications available at the time of the quotation, and are not guaranteed to meet bid specifications. Product specifications may be changed by the manufacturer without notice. It is your responsibility to verify product conformance to specifications of any subsequent contract. All products are subject to availability from the manufacturer. The freight costs listed are estimates. Shipping costs may vary based on time of purchase, quantity ordered, shipment carrier and warehouse sourced. Actual shipping costs will be calculated during shipment and will be reflected on your invoice. For hardware product(s), manufacturer warranty will begin upon physical delivery of the hardware products(by) by the customer or GST warehouse. For software product(s), the manufacturer warranty will begin upon electronic or physical receipt of the software product(s) by you or GST. Any returns must be approved by GST based on manufacturer approval. More details at gstes.com/RMA.
GST is not responsible for compliance with regulations, requirements or obligations associated with any contract resulting from this quotation unless said regulations, requirements or obligations have been passed to GST and approved in writing by an authorized representative of GST.
WE DO EVERYTHING WE CAN TO ENSURE THAT THE PRICES WE HAVE QUOTED ARE CORRECT AND CURRENT, AND WE TRY TO KEEP OUR PRICES CONSTANT. HOWEVER, DUE TO RAW MATERIAL AND
LOGISTICS, PRICING MAY INCREASE AT ANY TIME FROM OUR OEM AND VENDORS THAT IS OUT OF OUR CONTROL.
Quote #101400 v4 Page: 12 of 14
k:e7d GST
IT & AV Solutions for a Connected World
GSTINC.COM 800.833.0128
Statement of Work Authorization
I agree with the tasks described in the aforementioned statement of work for the project. I understand that if there are any changes to the Statement of Work that GST will provide a revised statement of work and a quote for any additional charges. By signing below, each party agrees to the terms of this Agreement and GST will begin in executing this statement of work.
Client Acceptance:
Authorized Signature
Printed Name
Title
Date
GST Acceptance:
Authorized Signature
Printed Name
Title
Quote #101400 v4
Page: 13 of 14
4:461G
IT & AV Solutions for a Connected World
GSTINC.COM 800.833.0128
Date
Quote #101400 v4
Page: 14 of 14