Contract Change Order No.6
Project Title: Old City Hall Office Renovation, City Project No. 5106 Owner: Clio of PIitonll. Contractor: A2Z COneltUer Inc
You are hereby directed to make the herein described changes from the plans and specifications or to do the following described work not included in the plans and specifications on this contract:

Sewer Line Replacement and
Additional Exterior Window Replaced and Installed in Office 103 This Change Order provides:
a) Extra work and credits identified in Exhibit A
$ 27,909.90
2 This Change Order came about from:
a)
Request for the removal and replacement of 77' of the existing damaged sewer lateral, as well as replacement of an exterior window that was cracked.
3 Action to be taken:
a) The Contractor was directed to provide a lump sum price for this change. 4 Compensation
a) Adjustment of Line Items exceeding 25%
b) Extra work
d) Credits
$ 27,909.90
Total $ 27,909.90
5 Contract Time Extension
a) 13 Working Days
In addition to work specified in the bid specifications, this change order includes all extra work, field adjustments and credits. This work is an Owner initiated change and includes all labor, equipment, materials, and supervision and Administration.

CHANGE TO CONTRACT COST: CHANGE TO CONTRACT TIME:

Contract Amount: $ 465,000.00 Original Working Days: 90 Previous CCOs:

Adjustment of Line Items
Exceeding 25%
$ 71,992.40 Original Date of Completion: 8/18/2022
Previous CCOs Working Days: 28
Total Extra Work $ 27,909.90 Additional Working Days: 13 Total Field Adjustments $
Total Credits $ Adjusted Total of Working Days. 131
Changes in Line Items: $ 27,909.90 Adjusted Date of Completion: 10/17/2022 Current Contract price: $ 564,902.30
Prepared by:

Recommended:

Recommended:

Approved by:

Raquel Garcia, Project Manager, City of Placentia
Masoud Sepahi, City Engineer, City of Placentia
Luis Estevez, Deputy City Administrator, City of Placentia Damien R. Arrula, City Administrrator, City of Placentia We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal, is approved, that we will provide all equipment, furnish all materials, except as may otherwise be shown above
Accepted:

If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.

No.
2 CCO No. 6 Exhibit 'A'
Project Title: Old City Hall Office Renovation Project, City Project 5106 Owner: City of Placentia Contractor: A2Z Construct Inc
Actual
Description Bid $$ Comments CREDIT EXTRA
Due to a deteriorating sewer lateral, the connection can not be made. The removal of 77' of existing damaged 6"
cast iron pipe will be replaced with new 6" SDR35 PVC LS $25,245.43 Includes 15% Markup $25,245.43 pipe. Includes shoring, backfill and compaction and
asphalt repair.

At the request of the Deputy City Administrator, the
purchase and installation of an existing exterior window in Office 103 that was in need of replacement due to age and cracking.

LS $2,664.47 Includes 15% Markup $2,664.47
3 - $0.00
4 $0.00
5 $0.00
6 $0.00
7 $0.00
8 $0.00
Sum of Line Item Adiustments $ $27.909.90
Cost of Line Item adjustments $ 27,909.90
Chance in Contract Cost $27,909.90

A2Z Construct Inc PROPOSED

CHANGE ORDER
PO Box 80425 Phone: (949)283-5179
Rancho Santa Margarita, CA 92688 Fax: (949)589-4274
TITLE: Sevier Line Removal DATE: 10/26/2022
No. 6 51
PROJECT:

Old 1City Hall Office Renovation Project
TO: Attnl: Raquel Garcia CONTRACT/PO: 5106
Citylof Placentia
4011East Chapman Avenue SUBMITTED:

Placentia, CA 92870 COMPLETED:

REQUIRED:

DESCRIPTION
Per Owner request the following is our proposal;
1) Remove existing! damaged 6" cast iron pipe
2) Replace with new 6" SDR35 PVC pipe
3) Backfill and compaction to include 3" sand below and above pipe; shoring trench; patch asphalt 4) Equipment
5) Material
6) Labor
10 additional working days
Num Item Description
1 Labor
2 Equipment and Material
3 1Markup (15%)

APPROVAL
By:

Date:

Ref
Qty Unit Unit Price Amount
145.000 Hrs 65.19 9,452.55

1.000 12,500.00 12,500.00

0.000 0.00 3,292.88
Total: $25,245.43
By:6(/*
Date: IOP --6 I

A2Z Construct Inc
PO Box 80425 Phone: (949)283-5179
Rancho Santa Margarita, CA 92688 Fax: (949)589-4274
TITLE: Additional Exterior Window DATE: 10104/2022
PROJECT:

PROPOSED

CHANGE ORDER
No. 6 X
TO:

Old City Hall Office Renovation Project
Attn: Raquel Garcia
City of Placentia
401 East Chapman Avenue
Placentia, CA 92870

DESCRIPTION
Per Owner request purchase and install additional exterior window.

Three (3) extra working days
Num Item Description
1 Material and Equipment
2 Labor
3 Mark-up 15%

APPROVAL
By:

Date:

Ref
CONTRACT/PO: 5106
SUBMITTED:

COMPLETED:

REQUIRED:

Qty Unit Unit Price Amount

0.000 0.00 1,580.00

10.000 Hrs 65.19 651.90

0.000 0.00 432.57
By:

Date.

Item Total: $2,664.47
Total: $0.00
Total: $2,664.47