Cities Index.
1.O.2 LS-1 OPTION E SAVINGS OUTLOOK

Placentia City Council
July 25, 2023

Document
1.O.2 LS-1 OPTION E SAVINGS OUTLOOK
Meeting
July 25, 2023
Body
Placentia City Council
Pages
1
Original file
3 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

CONFIDENTIAL AND/OR PROPRIETARY INFORMATION OF SOUTHERN CALIFORNIA EDISON AND/OR ITS CUSTOMERS OR VENDORS. PUBLIC DISCLOSURE IS RESTRICTED.

CUSTOMER NAME
Customer Number:

HPSV Lamp Wattage &
Monthly kWh
50 Watt 20.0 kWh
70 Watt 28.6 kWh
100 Watt 40.4 kWh
150 Watt 66.6 kWh
200 Watt 84.9 kWh
250 Watt 108.0 kWh
310 Watt 132.1 kWh
400 Watt 167.3 kWh
Total

PLACENTIA, CITY OF
1004258509
LED Equivalent
Wattage & Monthly
kWh
22 Watt 7.8 kWh
29 Watt 9.5 kWh
37 Watt 12.9 kWh
59 Watt 19.8 kWh
76 Watt 26.7 kWh
121 Watt 42.3 kWh
130 Watt 44.0 kWh
160 Watt 54.3 kWh
Estimated Annual
kWh Reduction
150
523,997
84,041
140,920
88,652
1,575
0 5,430
844,765
Lamp Count
1 2,282
255
251
127
2 0
4 2,922
Estimated
High Pressure
Sodium Vapor
(HPSV)
Annual Costs
$170
$433,580
$56,100
$73,041
$43,307
$800
$0
$2,192
$609,190
Estimated
Light Emitting Diode
(LED)
Annual Costs
$150
$362,838
$43,095
$48,945
$27,940
$536
$0
$1,272
$484,776
Note: The LS -1 Tariffs lists LED Wattages (including driver loss) in 5 watt increments. Monthly energy use is the mid -point range.

Estimated Annual
Savings
$20
$70,742
$13,005
$24,096
$15,367
$264
$0
$920
$124,414
This analysis is only a 12 month estimate and the results presented are based on HPSV Lamp Wattage and counts above as of October 2022, LED wattage conversion lamps available at this time, and October 1, 2022 rates. Results are rounded. This analysis excludes the following when applicable: Tap Device Charge, State Tax, Utility Users Tax, and Generation Municipal Surcharge. The analysis does not include costs associated with Incandescent, Mercury Vapor, Low Pressure Sodium Vapor, Metal Halide, or already existing LED Lamps. Actual costs may vary due to factors including but not limited to, rate changes, factor changes, wattage conversion changes, excluded cost components.

This analysis is provided to help you evaluate your current Southern California Edison (SCE) bill and/or compare your projected bills to other SCE rate options. These results are based on your past usage and/or assumptions about your energy usage and cannot be guaranteed by SCE. This rate analysis may not reflect all of the rate options that are available to you as an SCE customer.

Your actual bills will vary from this analysis due to changes to your actual usage and assumptions such as operating hours, the equipment you use, kVAR charges, weather patterns, service voltage, firm service levels, taxes, and added facilities charges. Moreover, the rate options used in this analysis are subject to change by the California Public Utilities Commission (CPUC), which would also alter the outcome of this analysis.

If your current rate schedule becomes unavailable — either by action of the CPUC or because you are no longer eligible to be placed on the rate — you will be notified of your rate options. If you do not select a different applicable rate option at that time, you will be placed on a default rate schedule.

SCE, Confidential Placentia HPSV Database 20230712.xlsx 7/12/2023

← All documents from this meeting