Cities Index.
1.F.2 SCOPE & FEES

Placentia City Council
October 17, 2023

Document
1.F.2 SCOPE & FEES
Meeting
October 17, 2023
Body
Placentia City Council
Pages
13
Original file
5 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

DENNIS GRUBB & ASSOCIATES
A Willdan Engineering Company
Fire Plan Review Services
Willdan Engineering presently provides fire plan review to a number of municipalities and jurisdictions throughout Southern, Central and Northern California. Willdan has gained a great deal of municipal insight and expertise in serving our extensive clientele over the years. We have performed fire plan review and inspection on projects ranging from single family residential additions to complex high rise towers (including hotels, casinos), arenas/stadiums, parking structures, medical facilities, and industrial centers.

Willdan's plans examiners are ICC certified fire plans examiners and/or certified fire marshals. In addition, our fire inspectors are all ICC certified fire inspectors.

Fire plans including suppression systems, alarm systems, sprinkler systems and fire -life safety, will be reviewed in accordance with:
• Current adopted California Fire Code (CFC)
Current adopted California Building Code (CBC) sections adopted by the California State Fire Marshal • Local amendments and policies related to the CFC and CBC • City code and standards
• Adopted National Fire Protection Standards
• California Health and Safety Code
Appropriate listings
Fire Inspection Services
Inspection staff will be available to meet with City staff, builders, developers, and citizens to provide assistance and resolve any inspection issues that may arise. Inspectors shall attend and participate in required meetings with other City inspection and plan review staff, property owners, contractors and/or design professionals.

Inspectors will review the permit package to verify that the on-site condition is consistent with the appropriate records for square footage, setbacks, heights, and other requirements that may be applicable.

Inspectors will comply with the City's procedures for reporting inspection results, use City inspection correction forms, make appropriate entries onto the permit documents, and follow City procedures prior to finalizing a building permit.

Willdan will verify that all inspection records, including daily records of what was inspected which will be recorded on the job card, and permit copy entered into the City's Building and Safety computer system.

We will employ such techniques as necessary to minimize delays to builders and provide helpful advice and counsel to builders, owners, engineers, and architects as to enhance the orderly flow of the construction process yet maintaining an effective level of enforcement. Inspectors shall ensure that any construction changes are documented and approved by appropriate City staff.

Methodology
■ Pick up and drop off plans at Placentia Fire Department or use a courier/mail service (within the stated turnaround time).
■ Verify plan compliance with adopted state & local codes/ordinances including updates. ■ Communicate corrections with applicant and Placentia Fire Department as directed. ■ Stamp plans in a manner as directed by the Placentia Fire Department. ■ Be available for phone calls or in-person meetings with Placentia Fire Department as needed.

Page 11 ends

DENNIS GRUBB & ASSOCIATES
A Willdan Engineering Company
■ Assist with adopting and administering the Fire Code as needed. ■ Conducting fire life safety inspections of new construction and annual inspections as needed. ■ Plan review to ensure compliance with all applicable codes. ■ Provide input to the Planning Department for new development and provide project specific conditions as applicable.
■ Review and provide response to Fire Code alternate means & methods/practical difficulty requests after consultation with the Fire Marshal.
■ Other duties as needed and agreed to between Dennis Grubb & Associate and the Placentia Fire Department.

Plan Turnaround Plan Review Times:
■ Initial review — 10 city business days from time of receipt ■ Resubmittals — 7 city business days from time of receipt

Page 12 ends

DENNIS GRUBB & ASSOCIATES
A Willdan Engineering Company
Fee Schedule

SERVICE TYPE
Plan Review
FD Access
Alarm System
Sprinkler System —TI
Sprinkler—TI with calculations
Sprinkler System — New
Additional Riser/Floor Control in Same Building
Underground
Fire Pump
Standpipe System
Engineered System (H&D, Clean Agent, etc) per System
Special System/ Process (HPS, AST, UST, Spray Booth etc.) ea Hazardous Material Disclosure
Development Review (CUP, Tract Map, Etc.)
Revision
Additional Reviews (Past 2nd
Expedite Plan Check (per submittal)
Time & Material (Hourly Rate)
Inspection
Inspections (4 hr. minimum)
Inspection Mileage (use of POV)

Page 13 ends

FEE
$405
$360
$325
$385
$535
$185
$520
$580
$275
$295
$420
$920
$405
$240
$240
$220
$130
$110
IRS Published Rate

← All documents from this meeting