City of Placentia
10 Year Capital Improvement Plan
Total for All Columns:
$38,082,964
Column Totals:
$10,265,716
$491,378
$3,083,994
$5,921,696
$1,193,517
$6,125,640
$1,541,671
$2,151,466
$5,724,121
$1,583,765
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating
Priority
Score
Remaining
Useful Life
Current Cost
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
Koch Park - Site
Shed/Gazebo/Shade Structure,
F1020 Wood or Metal -Framed,
Basic/Minimal, Replace
Kraemer Storm Fire Extinguisher, Wet
Water Pump D4030
Station
Parque de Los
Vaqueros - Site
Aguirre
Community Center
Chemical/CO2, Replace
2024 The structure is visibly leaning and subject to collapse. 2024 Missing Fire Extinguisher
G2050 Playfield Surfaces, Artificial Play 2024 Torn material, holes filled in with sand. Tripping hazard Turf, Replace
P2030
Champions Sports
Park - Snack P2030
Shack
Fire Station 2
Jaycee Parkette
Jaycee Parkette
Jaycee Parkette
P2030
Architectural Study, Building
Envelope, Roof, Evaluate/Report
Architectural Study, Building
Envelope, Roof, Evaluate/Report
Engineering Study, Structural,
Superstructure, Evaluate/Report
52050 Play Structure, Multipurpose,
Small, Replace
2024
2024
2024
The exterior roofing structural members around building perimeter appear to be deteriorated and roof leaks has also been reported. A roofing study is recommended to analyze poor existing conditions and structural stability.
The exterior roofing structural members around building perimeter appear to be deteriorated and roof leaks has also been reported. A roofing study is recommended to analyze poor existing conditions and structural stability.
must be retained to analyze the existing condition, provide recommendations and, if necessary, estimate the scope and cost of any required repairs. In 2022, the City Building Official inspected this wall and determined that it is not weight beanng and there is no imminent risk of 2024 This playground is very old and shows signs of deterioration. It should be replaced soon
52050 Play Structure, Swing Set, 4 Seats, 2024
Replace
52050 Playfield Surfaces, Artificial Play 2024
Turf, Replace
McFadden Park - G2050 Playfield Surfaces, Rubber, Small 2024 Site Areas, Replace
Whitten D7050 Fire Alarm Panel, Multiplex,
Community Center Replace
This swing set is very old with fading finishes and corrosion present on much of the structure,
This artificial play surface in in extremely poor condition, with missing sections of turf and vandalized with spray paint. The missing sections and the transitions from turf to sand are tripping hazards.
The playground rubber surfacing is in a state of disrepair, with cracks and delaminated surfacing.
2024 This fire alarm panel is five years beyond its expected useful life.
Poor
NA
99 0 $ 120,000 $ 120,000 $
92 0 0 960 $ 960 $
Failed 92 0 $ 44,800 $ 44,800 $
NA 90 0 $ 22,400 $ 22,400 $
NA 90 0 $ 22,400 $ 22,400 $
NA 90 0 $ 32,000 $ 32,000 $
Poor 90 0 $ 64,000 $ 64,000 $
Poor 90 0 $ 16,000 $ 16,000 $
Poor 90 0 $ 89,600 $ 89,600 $
Poor 90 0 $ 307,840 $ 307,840 $
Poor 90 0 $ 12,800 $ 12,800 $
90 0 $ 89,069 $ 89,069 $
Poor 90 0 $ 84,000 $ 84,000 $
Poor 90 0 $ 403,200 $ 403,200 $
Poor 90 0 $ 48,000 $ 48,000 $
Poor 90 0 $ 12,800 $ 12,800 $
Poor 90 0 $ 18,691 $ 18,691 $
Whitten Fire Alarm System, Full System The fire alarm wiring, activation and notification devices have reached the Community Center D7050 Upgrade, Standard Addressable, 2024 Upgrade/Install end of their expected useful life. Poor Parque de Los
Ninos - Site
Parque de Los
Ninos - Site
G2050 PlayfieldDepth, SurfaReplacces,e Chips Rubber, 2024 The playground surfaces need to be renewed 6"
G2050 Play Stmcture, Multipurpose, Very 2024 The la
Small, Replace playground structure needs to be renewed.
Parque de Los G2050 Play Structure, Swing Set, 4 Seats, 2024 Thela Ninos -Site Replace playground structure needs to be renewed.
Placentia Teen D7050 Fire Alarm Panel, Multiplex,
Center Replace
Placentia Teen
Center
2024 The fire alarm panel is a major safety feature for the facility, and is over ten years beyond its expected useful life.
Fire Alarm System, Full System The fire alarm infrastructure and components are a major safety feature D7050 Upgrade, Standard Addressable, 2024 for the facility, and beyond their expected useful life.
Upgrade/Install
$ $ - $
$ $
$ $
$ $ - $
$ $
$
$
$ -
$ $ - $
$ $ - $
$ $
$ _ $
$ - $ - $ - $ - $ - $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments Rating PScoreriority UsefRemainiulLifeng Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
Richard Samp Playfield Surfaces, Rubber, Small
2024 The robber surfacing for the play set is significantly damaged, and not Park G2050 Areas, Replace capable of providing fall protection for users.
Tuffree Park - Site G2050 Play Structure, Swing Set, 4 Seats, 2024 This swing set is in poor condition and should be renewed soon Replace
Tuffree Park - Site G2050 Play Structure, Multipurpose, Medium, Replace
Poor
Poor
2024 This playground set is in poor condition and should be renewed soon. Poor TUHree Park - Site G2050 Playfield Surfaces, Sand, 6" Depth, 2024 This sand play surface is in poor condition and should be renewed soon. Poor Replace
TUHree Park - Site G2050 Playfield Surfaces, Artificial Play 2024 This artificial surface is in poor condition and should be renewed soon. Poor Turf, Replace
Aguirre The roof eave members and roof members at building entrance shed Community Center B1020 Roof Sheathing, Plywood, Replace 2024 appear to be deteriorating and showing signs of wear. It is recommended to reinforce the damaged areas with wood to ensure stability.
Poor
Aguirre 03010 Roofing, Asphalt Shingle, 20 -Year 2024 The roof covering is almost 10 years beyond its expected useful life, with poor Community Center Standard, Replace most of granules missing from shingles.
Aguirre 03010 Roofing, any type, Repairs per
Community Center Man -Day, Repair
Aguirre B3010 Roofing, Modified Bitumen,
Community Center Replace
Champions Sports
Park - Snack B1020 Roof Sheathing, Plywood, Replace 20
Shack
2024 Roof leaks has been reported. Remove and replace any damaged clay tiles and thoroughly clean moss on the roof surface.
2024 The roofing membrane appears to be at the end of its expected life and needs replacement soon.
Champions Sports Roofing, any type, Repairs per
Park - Snack 03010 Man -Day, Repair
Shack
Champions Sports
Park - Snack
Shack
City Corporate
Yard Building
City Corporate
Yard Building
City Hall (with
Police Station)
The roof eave members and roof exterior wood members around 24 perimeter of the building appear to be deteriorating and showing signs of wear It is recommended to reinforce the damaged areas with wood to ensure stability.
2024 Roof leaks have been reported and water leakage is damaging the ceiling.
Remove and replace any damaged and missing clay tiles.
D3030 Evaporative Cooler, 0.75 to 1 HP, 2024
8000 CFM, Replace
B3010 Roofing, Modified Bitumen,
Replace
B3060 Roof Skylight, per unit, up to 20
SF, Replace
B3010 Roofing, Modified Bitumen,
Replace
Backs Community B3010 Roofing, any type, Repairs per
Center Man -Day, Repair
McFadden Park - Roofing, any type, Repairs per
Pool Equipment B3010 Man -Day, Repair
Building
Melrose Storm Roofing, Modified Bitumen,
Water Pump B3010
Station
Replace
Tynes Gym B3010 Roofing, Modified Bitumen,
Replace
2024
The building's evaporative cooler has been noted to be non-operative.
Given the age of the building, it is evident that the unit has significantly exceeded its expected useful life. Therefore, immediate replacement is necessary.
This roof is beyond its expected useful life and showing signs of deterioration due to age. Roof skylights and exhaust edges are leaking water during rain. Cracking of roof membrane in the northwest comer of the roof and leakage inside the building observed.
2024 Skylights are leaking water, and should be replaced as part of the roof replacement project.
2024 Roof leaks were reported at multiple locations
2024 Roof leaks were observed and reported throughout, repair is required. 2024 The beam displays signs of decay and requires repair or replacement. 2024 The roof is neanng the end of its expected useful life, with ponding and leaks occurring at the roof hatch due to poor roof slope. 2024 This roof is in poor condition and should be replaced soon.
Poor
Poor
Poor
90 0 $ 87,360 $ 87,360 $
90 0 $ 8,000 $ 8,000 $
90 0 $ 64,000 $ 64,000 $
90 0 $ 9,293 $ 9,293 $
90 0 $ 55,040 $ 55,040 $
65 0 $ 9,600 $ 9,600 $
65 0 $ 10,397 $ 10,397 $
65 0 $ 7,040 $ 7,040 5
65 0 $ 15,360 $ 15,360 $
65 0 $ 8,320 $ 8,320 $
Poor 65 0 $ 10,560 $ 10,560 $
Failed 65 0 $ 16,640 $ 16,640 $
Poor 65 0 $ 352,000 $ 352,000 $
Poor 65 0 $ 20,800 $ 20,800 $
Poor 65 0 $ 672,000 $ 672,000 $
Poor 65 0 $ 7,040 $ 7,040 $
Poor 65 0 $ 3,520 $ 3,520 $
Poor 65 0 $ 11,520 $ 11,520 $
Poor 65 0 $ 416,000 $ 416,000 $
$ _ $
$ -
$ _ $
$ _ $
$ _ $
$ _ $ _ $
$ _ $ _ $
_ $ _ $ - $ - $
- $ - $ - $ - $
- $ - $ - $ - $
$ -
$ _ $ _ $ - $ _ $ -
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost
Score Useful Life
2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
Bradford Avenue Elevator Cab Finishes, Standard, The rubber tile flooring in the elevators are in poor condition, with Pedestrian Bridge D1010 Replace 2024 damages and slipping concerns Interior lighting is also damaged or missing.
Poor
Bradford Avenue Passenger Elevator, Hydraulic, 3 The North Tower elevator was found to be inoperable during the Pedestrian Bridge D1010 Floors, 1500 to 2500 LB, Renovate 2024 assessment It's assumed this is a maintenance issue but we've assigned Poor it as a poor rating to bring attention to the issue.
Bradford Avenue D1010 Elevator Controls, Automatic, 1
Pedestrian Bridge Car, Replace
The North Tower elevator was found to be inoperable during the 2024 assessment It's assumed this is a maintenance issue but we've assigned Poor it as a poor rating to bring attention to the issue.
Aguirre Packaged Unit, RTU, Pad or Roof -
2024
packaged unit has significantly exceeded its expected useful life and Community Center D3050 Mounted, Replace 2024 exhibits clear signs of aging and wear. Replacement is required in the Poor immediate future.
Aguirre G4050 Extenor Fixture w/ Lamp, any type, 2024 The fixtures show signs of wear.
Community Center w/ LED Replacement, Replace
City Corporate
Vard Building
City Corporate
Vard Building
City Corporate
Yard Building
City Corporate
Vard Building
City Corporate
Vard Building
City Corporate
Vard Building
City Corporate
Vard Building
City Corporate
Yard Building
City Corporate
Yard Building
City Corporate
Yard Building
City Corporate
Yard Building
City Corporate
Vard - Site
City Hall (with
Police Station)
City Hall (with
Police Station)
D2010 Water Heater, Gas, Residential,
Replace
2024 This water heater is over 20 years beyond its expected useful life, and should be replaced soon. There is no hot water at the kitchen sink.
Plumbingann, Low De, Density ex & The plumbing infrastructure is likely original construction and should be D2010 Sanitary, (excludes 2024
fixtures), Replace replaced soon
D3020 Unit Heater, Electric, Replace
Poor
Poor
Poor
2024 This heater is well beyond its expected useful life and should be replaced poor soon
D3050 HVAC System, Ductwork, Medium 2024 The HVAC ductwork appears to be original construction, and over 20 Density, Replace years beyond its expected useful life
D3050
D3050
Packaged Unit, RTU, Pad or Roof -
Mounted, Replace
Packaged Unit, RTU, Pad or Roof -
Mounted, Replace
Poor
This packaged unit is beyond its expected useful life. The client reports 2024 there is no heat from this unit with concerns over capability of this unit to Poor serve the building size.
This packaged unit is beyond its expected useful life. The client reports 2024 there is no heat from this unit with concerns over capability of this unit to serve the building size.
Poor
D5020 Switchboard, 120/208 V, Replace 2024 This switchboard is 10 years beyond its expected useful life and should be poor replaced soon
D5020 Secondary Transformer, Dry,
Stepdown, Replace
2024 Thisreplatranced ssfoonormer is 20 years beyond its expected useful life and should be poor D5020 Switchboard, 277/480 V, Replace 2024 This switchboard is 10 years beyond its expected useful life and should be poor replaced soon
D5020 Distribution Panel, 120/208 V,
Replace
Electrical System, Wiring &
D5030 Switches, Average or Low
Density/Complexity, Replace
Fuel Storage Tanks and
D3010 Dispensers, Fuel Storage Tanks
and Dispensers, Replace
D5020 Secondary Transformer, Dry,
Stepdown, Replace
This distribution panel is beyond its expected useful life. In addition, 2024 Federal Pacific panels have a poor track record of safety and reliability, Poor and would not meet today's safety standards.
2024 The electrical distribution wiring and components are likely original construction and should be renewed soon.
Poor
2024 This project is to replace the two underground fuel storage tanks and fuel poor dispensers.
This transformer is original construction and twenty years beyond its 2024 expected useful life. In addition, Zinsco electrical equipment have known Poor safety issues in some of their equipment.
This switchboard is original construction and twenty years beyond its D5020 Switchboard, 120/208 V, Replace 2024 expected useful life. In addition, Zinsco electrical equipment have known safety issues in some of their equipment.
Poor
60 0 $ 115,200 $ 115,200 $
60 0 $ 224,000 $ 224,000 $
60 0 $ 16,000 $ 16,000 $
60 0 $ 64,000 $ 64,000 $
60 0 $ 9,600 $ 9,600 $
60 0 $ 4,160 $ 4,160 $
60 0 $ 176,000 $ 176,000 $
60 0 $ 7,040 $ 7,040 $
60 0 $ 64,000 $ 64,000 $
60 0 $ 17,600 $ 17,600 $
60 0 $ 28,800 $ 28,800 $
60 0 $ 128,000 $ 128,000 $
60 0 $ 24,320 $ 24,320 $
60 0 $ 112,000 $ 112,000 $
60 0 $ 6,400 $ 6,400 $
60 0 $ 88,000 $ 88,000 $
60 0 $ 1,372,800 $ 1,372,800 $
60 0 $ 96,000 $ 96,000 $
60 0 $ 144,000 $ 144,000 $
$ $
$ _ $ _ $
$ -
$ _ $
$ - $ - $ - $ - $ - $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments Rating priority Remaining Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Score Useful Life
City Hall (with This switchboard is original construction and twenty years beyond its Police Station) D5020 Switchboard, 120/208 V, Replace 2024 expected useful life. In addition, Zinsco electrical equipment have known Poor 60 0 $ 166,720 $ 166,720 $ - $ - $ - $ - $ - $ $ - $ - $ safety issues in some of their equipment.
City Hall (with Distribution Panel, 120/206 V, This panel is original construction and twenty years beyond as expected Police Station) D5020 Replace 2024 useful life In addition, Zinsco electrical equipment have known safety Poor 60 0 $ 19,200 $ 19,200 $ - $ - $ - $ - $ - $ - $ - $ - $ issues in some of their equipment.
City Hall (with Motor Control Center, w/ Main
This motor control center is original construction and twenty years beyond Police Station) D5020 Breaker, Replace 2024 its expected useful life. In addition, Zinsco electrical equipment have Poor 60 0 $ 48,000 $ 48,000 $ - $ - $ - $ - $ - $ - $ - $ - $ known safety issues in some of their equipment.
City Hall (with Motor Control Center, w/ Main
This motor control center is original construction and twenty years beyond Police Station) D5020 Breaker, Replace 2024 its expected useful life. In addition, Zinsco electrical equipment have Poor 60 0 $ 48,000 $ 48,000 $ - $ - $ - $ - $ - $ - $ - $ - $ known safety issues in some of their equipment.
Edwin T. Powell D3020 Furnace, Gas, Replace 2024 The unit is showing signs of age and decreased efficiency. Poor 60 0 $ 19,840 $ 19,840 $ - $ $ - $ - $ - $ - $ - $ - $ Building
Edwin T. Powell D3020 Furnace, Gas, Replace 2024 The unit has surpassed as expected service life by a considerable margin poor 60 0 $ 19,840 $ 19,840 $ - $ - $ - $ - $ - $ - $ - $ - $ Building and is showing signs of age and decreased efficiency.
Edwin T. Powell D3030 Split System, Condensing 2024 The unit has surpassed its expected service life by a considerable margin poor 60 0 $ 66,560 $ 66,560 $ - $ - $ - $ - $ - $ - $ - $ - $ Building Unit/Heat Pump, Replace and is showing signs of age and decreased efficiency.
Edwin T. Powell D3030 Split System, Condensing 2024 Replaced fan motor recently, condition looks poor from outset. No data Poor 60 0 $ 66,560 $ 66,560 $ - $ - $ - $ - $ - $ - $ - $ - $ Building Unit/Heat Pump, Replace plate seems to be at least 30 year old unit.
Edwin T. Powell D5020 Distribution Panel, 120/240 V, 2024 This electrical panel has exceeded its expected useful life. Poor 60 0 $ 32,000 $ 32,000 $ - $ - $ - $ - $ - $ - $ - $ - $ Building Replace
Fire Station 1 D5010 Generator, Diesel, Replace 2024 This generator is very old and scheduled for replacement in 2024. Poor 60 0 $ 64,000 $ 64,000 $ - $ - $ - $ - $ - $ - $ - $ - $ Fire Station 1 D5010 Automatic Transfer Switch, ATS, 2024 This should be replaced with the generator in 2024. Poor 60 0 $ 27,200 $ 27,200 $ - $ - $ - $ - $ - $ - $ - $ - $ Replace
Fire Station 2 D5010 Generator, Diesel, Replace 2024 This generator is very old and scheduled for replacement in 2024. Poor 60 0 $ 128,000 $ 128,000 $ - $ - $ - $ - $ - $ - $ - $ - $ Pole Light Fixture w/ Lamps, any The light pole is corroded and safety cover is missing resulting in exposed Jaycee Parkette G4050 type 20' High, w/ LED 2024 Poor 60 0 $ 25,600 $ 25,600 $ - $ - $ - $ - $ - $ - $ - $ - $ Replacement, Replace/Install wiring.
Koch Park D5020 Secondary Transformer, Dry, 2024 This transformer is operational but almost 30 years beyond its expected Poor 60 0 $ 19,200 $ 19,200 $ - $ - $ - $ - $ - $ - $ - $ - $ Community Center Stepdown, Replace useful life
Koch Park D5020 Secondary Transformer, Dry, 2024 This transformer is operational but almost 25 years beyond its expected Poor 60 0 $ 21,440 $ 21,440 $ - $ $ - $ - $ - $ - $ - $ - $ Community Center Stepdown, Replace useful life
Koch Park D5020 Switchgear, 120/208 V, Replace 2024 This switchgear is operational but almost 15 years beyond its expected Poor 60 0 $ 480,000 $ 480,000 $ - $ $ - $ - $ - $ - $ - $ - $ Community Center useful life
Koch Park D5020 Distribution Panel, 120/240 V, 2024 This panelboard is operational but almost 25 years beyond its expected Poor 60 0 $ 17,600 $ 17,600 $ - $ $ - $ - $ - $ - $ - $ - $ Community Center Replace useful life
Koch Park Electncal System, Full System Given the age of the electrical equipment, a's assumed that the electrical Community Center D5020 Renovation/Upgrade, Medium 2024 infrastructure is original construction. This system operational but almost Poor 60 0 $ 94,464 $ 94,464 $ - $ $ - $ - $ - $ - $ - $ - $ Density/Complexity, Replace 25 years beyond as expected useful life.
Koch Park D5020 Distribution Panel, 120/240 V, 2024 This panelboard is operational but almost 25 years beyond its expected Poor 60 0 $ 3,520 $ 3,520 $ - $ $ - $ - $ - $ - $ - $ - $ Community Center Residential Style, Replace useful life
Building
Uniformat
Code
Cost Description
Project
Year
Comments Rating PScoreriority RUsefemaul inLifeing Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
Kraemer Memonal D2010 Drinking Fountain, Exterior/Site, Park - Site Metal Pedestal, Replace
Kraemer Memorial D5020 Distribution Panel, 120/240 V,
Park - Site Residential Style, Replace
Kraemer Storm
Water Pump
Station
D2010 Backflow Preventer, Domestic
Water, Replace
McFadden Park- D2010 Water Heater, Electric,
Site Commercial (12 kW), Replace
2024 The unit is not operational, replacement is recommended. 2024 This panel is beyond its expected useful life, with cortosion present over some of the panel.
Failed 60
Poor 60
2024 Backflow preventer stolen from site. Need new replacement with enclosure NA cage for protection
2024 Water heater is rusted out and beyond its expected useful life. Please note poor this barcode tag will be replaced soon.
Whitten 02010 Sink/Levatory, Service Sink, Floor, 2024 Sink has been disabled as custodial drain line has collapsed.
Community Center Replace
Melrose Storm
Water Pump
Station
Parque de Los
Ninos - Pool
Building
D2010 Roof Drains
Roof drains observed to have dirt and waste around it. Cleaning and 2024 regular maintenance is necessary to avoid damages due to drain blockage.
D2010 Emergency Plumbing Fixtures, Eye 2024 Fixture showing signs of wear and aging.
Wash & Shower Station, Replace
ParquePe Los
Ninos
- Pool 05020 Distribution Panel, 120/208 V,
Ninos - Replace
Building
Placentia Teen D2010 Water Heater, Gas, Residential,
Center Replace
Placentia Teen D5020 Distribution Panel, 120/240 V,
Center Replace
Richard Samp D2010 Backflow Preventer, Domestic
Park Water, Replace
Aguirre 02010 Sink/Lavatory, Wall -Hung,
Community Center Enameled Steel, Replace
Aguirre
Community Center D2010 Urinal, Standard, Replace
2024 Panel shows signs of severe rust.
2024 This water heater is well beyond its expected useful life. Itis also noisy and takes a long time to distribute hot water.
60 60
0 $ 4,800 $ 4,800 $
0 $ 3,520 $ 3,520 $
0 $ 10,240 $ 10,240 $
0 $ 39,680 $ 39,680 $
Failed 60 0 $ 2,560 $ 2,560 $
Poor 60 0 $ 3,200 $ 3,200 $
Poor 60 0 $ 7,360 $ 7,360 $
Poor 60 0 $ 6,400 $ 6,400 $
Poor 60 0 $ 4,160 $ 4,160 $
60 0 $ 8,000 $ 8,000 $
2024 This panel is well beyond its expected useful life, with 00000on present on poor the panel
2024 The backflow preventer is leaking badly.
2024 The fixtures appear to have reached the end of their expected useful life and exhibit signs of aging and wear.
Poor
Poor
2024 The fixtures appear to have reached the end of their expected useful life Poor Aguirre 02010 Toilet, Commercial Water Closet, 2024 The fixtures appear to have reached the end of their expected useful life Community Center Replace and exhibit signs of aging and wear.
Champions Sports Drinking Fountain, Exterior/Site,
Park - Snack 02010 Metal Pedestal, Replace
Shack
Champions Sports
Park - Snack D2010 Urinal, Standard, Replace
Shack
Champions Sports Sink/Lavatory, Wall -Hung,
Park - Snack 02010 Enameled Steel, Replace
Shack
2024 The fixtures are beyond the end of their expected useful life and exhibit signs of aging and wear.
Poor
Poor
2024 The fixtures appear to have reached the end of their expected useful life Poor
and exhibit signs of aging and wear.
2024 The fixtures appear to have reached the end of their expected useful life and exhibit signs of aging and wear.
Champions Sports Toilet, Commercial Water Closet, andThe fixtures appear to have reached the end of their expected useful life Park -Snack 02010 Replace 2024 exhibit signs
Shack p of aging and wear.
City Corporate
Yard Building
D2010 Sink/Lavatory, Service Sink, Floor, 2024 This sink is very old and in poor condition.
Replace
Poor
Poor
Poor
60 0 $ 10,240 $ 10,240 $
55 0 $ 16,320 $ 16,320 $
55 0 $ 7,040 $ 7,040 $
55 0 $ 20,800 $ 20,800 $
55 0 $ 9,600 $ 9,600 $
55 0 $ 7,040 $ 7,040 $
55 0 $ 21,760 $ 21,760 $
55 0 $ 20,800 $ 20,800 $
55 0 $ 2,560 $ 2,560 $
$ _ $
$ _ $
$ _ $
$ $ - $
$ $
$ $
$ $
$ - $
$ _ $
$ -
$ - $ - $ - $ - $ - $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating siority Remaining
core Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 al. 2032 2033 City Hall (with
Police Station)
Edwin T. Powell
Building
Sink/Lavatory, Service Sink, Floor, Client reported that drain is clogged, and backs up into police department D2010 Replace 2024 office area on a regular basis. Poor 55 Window, Wood Historical, 16-25 One of the windows shattered and broke due to wind. All windows B2020 SF, Restore 2024 showing signs of wear and deterioration. Failed 55 0 $ 2,560 $ 2,560 $
0 $ 172,800 $ 172,800 $
$ - $ - $ - $ - $ - $ - $ - $
$ - $ - $ - $ - $ - $ - $ - $
Edwin T. Powell D2010 Drinking Fountain, Exterior/Site, 2024 Non operable and not accessible. Poor 55 0 $ 2,240 $ 2,240 $ - $ - $ - $ - $ - $ - $ - $ - $ Building Economy Pedestal, Replace
Fire Station 2 D2010 Urinal, Waterless, Replace 2024 Client reported issues with this urinal. Poor 55 0 $ 1,920 $ 1,920 $ - $ $ - $ - $ - $ - $ - $ - $ Jaycee Parkette D2010 Drinking Fountain, Eoterior/Site, 2024 The drinking fountain is in very poor condition, with corrosion present on Poor 55 0 $ 9,600 $ 9,600 $ - $ - $ - $ - $ - $ - $ - $ - $ Metal Pedestal, Replace most of the fixture.
McFadden Park- G2060 Fences &Gates, Fence, Wrought 2024 A section of fencing is missing. Failed 55 0 $ 7,373 $ 7,373 $ - $ - $ - $ - $ - $ - $ - $ - $ Site Iron 6', Replace
Parque de Los
Vaqueros - Site
Parque de Los
Vaqueros - Site
G2020 Parking Lots, Pavement, Asphalt, 2024 Road surface has failed in localized areas, chunks are missing, high Mill & Overlay alligator cracking throughout. Renewal of pavement markings needed.
G2050 Campground Accessories, Grill, 2024 Highly costed metal. Unusable Pedestal -Style, Replace
Placentia Teen D2010 Toilet, Residential Water Closet, 2024 The toilets are aged and deteriorated Center Replace
Richard Samp D2010 Drinking Fountain, Exterior/Site,
Park Metal Pedestal, Replace
2024 The water fountain is damaged and significantly corroded.
Failed 55 0 $ 145,488 $ 145,488 $ - $ - $ - $ - $ - $ - $ - $ - $ Failed 55 0 $ 1,920 $ 1,920 $ - $ - $ - $ - $ - $ - $ - $ - $ Poor 55 0 $ 4,480 $ 4,480 $- $ - $ - $ - $ - $ - $ - $ - $ Poor 55 0 $ 4,800 $ 4,800 $- $ - $ - $ - $ - $ - $ - $ - $ Tuffree Park - Site G2030 Sidewalk, Concrete, Large Areas, 2024 Sidewalk has large deep cracks throughout and has otherwise faded in Failed 55 Replace most areas.
Champions Sports Foodservice Eqwpment, Coffee Out of service note suggests that the machine is non functional and needs Park - Snack E1030 Machine, Replace 2024 replacement. This product or part replacement could be covered under Failed 50 Shack warranty if effective.
City Corporate
Vard Building
City Corporate
Yard - Site
City Corporate
Yard - Site
City Hall (with
Police Station)
C1090 Lockers, Steel -Baked Enamel, 12" 2024 While functional, lockers appear to be showing signs of age, including W x 15" D x 72" H, Replace deteriorating finishes
Poor
G2020 Parking Lots, Pavement, Asphalt, 2024 The site pavement is in poor condition and the plan is to repave the entire poor Mill & Overlay lot as part of the Public Safety Building Project.
G2020 Parking Lots, Pavement, Asphalt, 2024 The site pavement is in poor condition and the plan is to repave the entire poor Seal & Stripe lot as part of the Public Safety Building Project.
G2020 Parking Lots, Pavement, Asphalt, 2024 Isolated areas of alligator asphalt surface, repair is recommended Repair
Edwin T. Powell
B2050 Exterior Door, Wood, Solid -Core, 2024 Doors showing signs of wear and deterioration. Paint is peeking off, and Building Replace the wood is aged.
Parking Lots, Pavement, Asphalt, The parking lot asphalt surface shows signs of the deterioration, and a Fire Station 1 G2020 Mill & Overlay2024 mill and overlay is required. This work should be accomplished at the same time with the parking lot replacement for the Old City Hall.
Fire Station 2 82050 Overhead/Dock Door, Aluminum, 2024 Door is hard to operate, but the motor is new and does not need 20'x14' (280 SF), Replace replacement.
Poor
Poor
Poor
Poor
0 $ 60,800 $ 60,800 $
0 $ 6,400 $ 6,400 $
$ - $ - $ - $ - $ - $ - $ - $
$ - $ - $ - $ - $ - $ - $ - $
50 0 $ 44,800 $ 44,800 $ - $ - $ - $ - $ - $ - $ - $ - $ 50 0 $ 358,400 $ 358,400 $ - $ - $ - $ - $ - $ - $ - $ - $ 50 0 $ 46,080 $ 46,080 $ - $ $ - $ - $ - $ - $ - $ - $
50 0 $ 33,280 $ 33,280 $ - $ $ - $ - $ - $ - $ - $ - $
50 0 $ 6,720 $ 6,720 $
50 0 $ 156,800 $ 156,800 $
50 0 $ 72,000 $ 72,000 $
$ - -
$ - -
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating siority Remaining
core Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 al. 2032 2033 Fire Station 2 B2050 Overhead/Dock Door, Aluminum, 2024 Door is hard to operate, but the motor is new and does not need 20'x14' (280 SF), Replace replacement.
Poor
Fire Station 2 02020 Parking Lots, Pavement, Asphalt, 2024 The asphalt pavement is in poor condition and needs to be renewed. Poor Mill & Overlay
Jaycee Parkette 02060 Trash Receptacle, Medium -Duty 2024 This trash receptacle H badly corroded with failed paint finishes Poor Metal or Precast, Replace
Irrigation System, Pop -Up Spray Given sections of dry grass the concern is the system as a whole isn't Jaycee Parkette G2080 Heads, Commercial, 2024 working properly The age of the park assets leads one to assume this Poor Replace/Install system is very old and should be renewed.
Jaycee Parkette G2080 Landscaping, Turf/Sod, Replace 2024 The turf on site is a mixed bag of fair and mostly poor conditions. If major Poor work on park is conducted, the turf should be part of that project.
Backs CommunityThe facade wood at the north west comer of the community building Center B1010 Balcony Structure, Wood, Replace 2024 exhibits signs of deterioration, repair is required Kraemer Memorial Sidewalk, any pavement type,
Park - Site G2030 Sectional Repairs (per Man -Day), 2024 Isolated areas of cracks and broken section, repair is required.
Repair
Kraemer Memorial 02080 Landscaping, Sod at Eroded
Park - Site Areas, Repair
2024 Isolated areas of eroded surface, repair is recommended Poor
Poor
Poor
50 0 $ 72,000 $ 72,000 $
50 0 $ 318,080 $ 318,080 $
50 0 $ 4,480 $ 4,480 $
50 0 $ 32,000 $ 32,000 $
50 0 $ 460,800 $ 460,800 $
50 0 $ 7,680 $ 7,680 $
50 0 $ 9,600 $ 9,600 $
50 0 $ 11,178 $ 11,178 $
$ - $ - $ - $ - $ - $ - $ - $
$ - $ - $ - $ - $ - $ - $ - $
$ - $ - $ - $ - $ - $ - $ - $
$ - $ - $ - $ - $ - $ - $ - $
$ - $ - $ - $ - $ - $ - $ - $
$ - $ - $ - $ - $ - $ - $ - $
$ - $ - $ - $ - $ - $ - $ - $
$ - $ - $ - $ - $ - $ - $ - $
McFadden Park- 02050 Campground Accessories, Grill' 2024 Grills are in failed comdition Poor 50 0 $ 3,840 $ 3,840 $ - $ - $ - $ - $ - 5 - $ - $ - $ Site Pedestal -Style, Replace
McFadden Park - Picnic Table,
Site G2060 Wood/Composite/Fiberglass, 2024 Tables need to be refinished or replaced. Poor 50 0 $ 3,840 $ 3,840 $ - $ - $ - $ - $ - $ - $ - $ - $ Replace
McFadden Park - 02060 Park Bench, Metal Powder -Coated, 2024 The park benches are broken Poor 50 0 $ 6,720 $ 6,720 $ - $ $ - $ - $ - $ - $ - $ - $ Site Replace
Whitten
Community Center B3080 Soffit, Wood, Replace 2024 The fascia exhibits signs of deterioration and moisture. Poor 50 0 $ 3,712 $ 3,712 $ - $ $ - $ - $ - $ - $ - $ - $ Melrose Storm Fences & Gates, Fence, Chain The fence and gate on the east side of the building are in poor condition Water Pump 02060 Link 6', Replace 2024 and require replacement. Signs of wear and damage observed. Poor 50 0 $ 8,064 $ 8,064 $ - $ - $ - $ - $ - $ - $ - $ - $ Station
Roadways, Pavement, Asphalt, The parking lot asphalt surface shows signs of the deterioration, mAl and Old City Hall 02010 Mill & Overlay2024 overlay is required a seal coat and pavement markings should be part of Poor 50 0 $ 120,960 $ 120,960 $ - $ - $ - $ - $ - $ - $ - $ - $ the project.
Gomez 03080 Soffit/Fascia, Gypsum Board, 2024 The fascia of the building on east and west side is damaged and coming Community Center Replace off, requiring replacement.
Parque de Los
Ninos - Site
F1050Pool Accessories, Underwater 2024 The pool lighting has been reported as inadequate. Replacement is Lighting, Replace
recommended.
Placentia Teen 02020 Parking Lots, Pavement, Asphalt, 2024 The pavement is missing striping for parking spaces and ADA pavement Center Seal & Stripe markings.
Richard Samp
Park
G2060 Picnic Table, Wood, Replace 2024 Wreplaood spdlitting and splintering is present, and this table needs to be ce
TUHree Park - Site G2020 Parking Lots, Pavement, Asphalt, 2024 The asphalt parking lot is in poor condition and needs to be replaced Mill & Overlay soon
Poor
Poor
Poor
Poor
Poor
50 0 $ 4,648 $ 4,648 $ - $ - $ - $ - $ - $ - $ - $ - $
50 0 $ 8,544 $ 8,544 $ - $ - $ - $ - $ - $ - $ - $ - $
50 0 $ 5,040 $ 5,040 $- $ - $ - $ - $ - $ - $ - $ - $
50 0 $ 1,920 $ 1,920 $ - $ - $ - $ - $ - $ - $ - $ - $
50 0 $ 62,400 $ 62,400 $ - $ - $ - $ - $ - $ - $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority
Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 al. 2032 2033 Tuffree Park - Site G2050 Sports Field and Court Lighting, ight Fixture w/ Lamps, Replace 2024 The lights are poor condition and should be renewed soon. Poor 50 0 $ 56,000 $ 56,000 $ - $ - $ - $ - $ - $ - $ - $ - $ L
Sports Site Lighting, Fields &
Tuflree Park - Site G2050 Courts, Pole Fixture w/ Lamps, 2024 The lights are poor condition and should be renewed soon. Poor 50 0 $ 56,000 $ 56,000 $ - $ - $ - $ - $ - $ - $ - $ - $ Replace
Tuflree Park - Site G2050 Sports Field and Court Lighting, Light Fixture w/ Lamps, Replace 2024 The lights are poor condition and should be renewed soon. Poor 50 0 $ 72,000 $ 72,000 $ - $ - $ - $ - $ - $ - $ - $ - $ Champions Sports Foodservice Equipment, Exhaust This range hood is significantly beyond its expected useful life, and should Park - Snack E1030 Hood, 3 to 6 LF, Replace 2024 be replaced soon. Poor 45 0 $ 10,560 $ 10,560 $ - $ - $ - $ - $ - $ - $ - $ - $ Shack
City Corporate C1070 Suspended Ceilings, Acoustical 2024 Water leakage observed at certain areas causing damage to suspended Failed 40 0 $ 4,480 $ 4,480 $ - $ - $ - $ - $ - $ - $ - $ - $ Yard Building Tile (ACT), Replace ceiling. Tile need to be replaced once the source of the leaks is addressed Aguirre Suspended Ceilings, Acoustical Water patches and damage have been observed on the ceiling tiles near Community Center C1070 Tile (ACT), Replace 2024 the west storage area of meeting facility. Replacement is needed. Poor 35 0 $ 2,240 $ 2,240 $ - $ - $ - $ - $ - $ - $ - $ - $ Champions Sports Suspended Ceilings, Acoustical
Park - Snack C1070 Tile (ACT), Replace 2024 Leakage and water patches observed. Replacement needed. Poor 35 0 $ 3,360 $ 3,360 $ - $ - $ - $ - $ - $ - $ - $ - $ Shack
Koch Park C2030 Flooring, any surtace, w/ Paint or 2024 The painted concrete floor is in fading condition, with moderate levels of Poor 35 0 $ 1,440 $ 1,440 $ - $ - $ - $ - $ - $ - $ - $ - $ Community Center Sealant, Prep &Paint spelling paint.
Koch Park C2030 Flooring, Vinyl Tile (VCT), Replace 2024 The vinyl composition floor tiles are in failing condition, with missing tiles Poor 35 0 $ 4,800 $ 4,800 $ - $ - $ - $ - $ - $ - $ - $ - $ Community Center and deteriorated finishes.
Kraemer Memorial Flooring, any sudace, w/ Paint or
Park- Restroom C2030 Sealant, Prep & Paint 2024 Concrete treatment is failing and needs renewal soon. Poor 35 0 $ 3,000 $ 3,000 $ - $ - $ - $ - $ - $ - $ - $ - $ Building
McFadden Park -Flooring, any surface, w/
Restroom Building
C2030 Elastomeric Coating, Prep &Paint 2024 The sealed concrete floor needs a new seal coat. Poor 35 0 $ 19,440 $ 19,440 $ - $ - $ - $ - $ - $ - $ - $ - $ Whitten Exterior Walls, Stucco, Prep & Fog
Community Center 82010 Coat or Paint, Prep & Fog Coat or 2024 The north facing exterior wall N stained and shows signs of moisture Poor 35 0 $ 13,446 $ 13,446 $ - $ - $ - $ - $ - $ - $ - $ - $ Paint
Whitten C2030 Flooring, any surface, w/ Paint or 2024 Floor sealant has failed and needs to be renewed. Poor 35 0 $ 2,400 $ 2,400 $ - $ - $ - $ - $ - $ - $ - $ - $ Community Center Sealant, Prep & Paint
Whitten
Community Center C2030 Flooring, Vinyl Sheeting, Repair 2024 Hole on the vinyl Poor 35 0 $ 1,523 $ 1,523 $ - $ - $ - $ - $ - $ - $ - $ - $ Whitten C2030 Flooring, Carpet, Commercial 2024 The carpeting has exceeded as expected useful life and shows signs of Poor 35 0 $ 81,600 $ 81,600 $ - $ - $ - $ - $ - $ - $ - $ - $ Community Center Standard, Replace deterioration due to age.
Parque de Los Wall Finishes, any surface, Prep &
Vaqueros - C2010 paint 2024 Highly worn paint. Torn up walls Poor 35 0 $ 8,640 $ 8,640 $ - $ - $ - $ - $ - $ - $ - $ - $ Restroom Building
Parque de Los Flooring, any surface, w/ Paint or
Vaqueros - C2030 Sealant, Prep &Paint 2024 No sealant on concrete Poor 35 0 $ 4,800 $ 4,800 $ - $ $ - $ - $ - $ - $ - $ - $ Restroom Building
Exterior Walls, Stucco, Prep & Fog
Placentia Teen There are holes present at several locations and graffiti painted on a wall, Center 82010 Coal or Paint, Prep & Fog Coal or 2024 The wall finish should be repaired with a new paint applied. Poor 35 0 $ 23,226 $ 23,226 $ - $ - $ - $ - $ - $ - $ - $ - $ Paint
Placentia Teen Casework, Cabinetry, Hardwood The kitchen cabinetry shows signs of aging, visible wear, scratches, chips E2010 2024 and a fading finish Poor 35 0 $ 24,000 $ 24,000 $ - $ - $ - $ - $ - $ - $ - $ - $ Center Standard, Replace
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost
Score Useful Life
2024 2025 2026 2027 2028 2029 2030 2031 J..
2032 ■ 2033
Bradford Avenue
Pedestrian Bridge
Aguirre
Community Center
D7030
D7030
Champions Sports
Park - Snack D7030
Shack
City Corporate
Yard Building
City Hall (with
Police Station)
D7030
D7030
Fire Station 1 D7030
Fire Station 2 D7030
Backs Community
Center
Whitten
Community Center
D7030
D7030
Old City Hall D7030
Gomez
Community Center
Placentia Teen
Center
Parque de Los
Vaqueros - Site
D7030
D7030
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
2024 Operational lease costs (annual)
2024 Operational lease costs (annual)
2024 Operational lease costs (annual)
2024 Operational lease costs (annual)
2024 Operational lease costs (annual)
2024 Operational lease costs (annual)
2024 Operational lease costs (annual)
2024 Operational lease costs (annual)
2024 Operational lease costs (annual)
2024 Operational lease costs (annual)
2024 Operational lease costs (annual)
2024 Operational lease costs (annual)
G2050 Play Structure, Swing Set, 4 Seats, 2025 Ripped plastic, rusted swings Replace
Tuffree Park - Site D2010 Drinking Fountain, Exterior/Site, Precast Pedestal, Replace
Tynes Gym
2025 Highly aged components
D2010 Sink/Lavatory, Service Sink, Floor, 2025 Highly corroded Replace
Edwin T. Powell G2060 Signage, Property, Building or Pole 20 Building Mounted, Replace/Install
Irrigation System, Controllers &
Jaycee Parkette G2080 Valves, Repairs & Adjustments,
Repair
Gomez 02050 Exterior Door, Steel, Standard,
Community Center Replace
Tuffree Park - Site G2050 Sports Apparatus, Baseball,
Backstop Chain -Link, Replace
NA 30 0 $ 12,000 $ 12,000 $
NA 30 0 $ 12,000 $ 12,000 $
NA 30 0 $ 12,000 $ 12,000 $
NA 30 0 $ 12,000 $ 12,000 $
NA 30 0 $ 12,000 $ 12,000 $
NA 30 0 $ 12,000 $ 12,000 $
NA 30 0 $ 12,000 $ 12,000 $
NA 30 0 $ 12,000 $ 12,000 $
NA 30 0 $ 12,000 $ 12,000 $
NA 30 0 $ 12,000 $ 12,000 $
NA 30 0 $ 12,000 $ 12,000 $
NA 30 0 $ 12,000 $ 12,000 $
Poor
Poor
Poor
25 The property's post mounted signage posts are showing signs of damage, poor as the wood seems to be deteriorating and coming off. Need replacement.
Given sections of dry grass the concern is the system as a whole isn't 2025 working properly The age of the park assets leads one to assume this system is very old and should be renewed.
2025 The doors are showing signs of rust and wear.
2025 Highly rusted and bent fencing material
Poor
Poor
90 1 $ 8,000 $
55 1 $ 11,520 $
55 1 $ 2,560 $
50 1 $ 4,800 $
50 1 $ 12,800 $
50 1 $ 3,840 $
Poor 50 1 $ 64,000 $
$ $ - $
$ $
$ _ $
$ _ $
$ _ $
$ _ $
$ 8,240 $ $ - $ - $
$ 11,866 $ $ - $ - $
$ 2,637 $ - $ - $ - $
- $ 4,944 $ - $ - $ - $
$ -
$ -
- $ 13,184 $ - $ - $ - $ - $ - $
$ 3,955 $ - $ - $ - $ - $ - $
$ -
- $ 65,920 $ - $ - $ - $ - $ - $ - $ - $
Building
Uniformat
Corte
Cost Description
Project
Year
Comments
Rating siority Remaining
core Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 al. 2032 2033 Tynes Gym 82020 Glazing, any type by SF, Replace 2025 Windows are single pane Operation is prone to failures. Poor 50 1 $ 193,600 $ - $ 199,408 $ - $ - $ - $ -$ - $ - $ - $ Champions Sports The dispenser unit has significantly exceeded its expected useful life.
Park - Snack E1030 Foodservice Equipment, , 2025 Replacement is required in the immediate future. Poor 45 1 $ 7,200 $ - $ 7,416 $ - $ - $ - $ - $ - $ - $ - $ Shack
City Hall (with B2010 Exterior Walls, any painted 2025 Surface repairs and fresh paint are required. Poor 35 1 $ 11,520 $ $ 11,866 $ - $ - $ - $ - $ - $ - $ - $ Police Station) surface, Prep & Paint
Gomez C2030 Flooring, any surface, w/ Paint or 2025 Paint chipping off for the most part Poor 35 1 $ 2,208 $ $ 2,274 $ - $ - $ - $ - $ - $ - $ - $ Community Center Sealant, Prep 8 Paint
Tynes Gym C2030 Flooring, Carpet, Commercial 2025 Stains and rips Poor 35 1 $ 6,000 $ $ 6,180 $ - $ - $ - $ - $ - $ - $ - $ Standard, Replace
Gomez 82010 Flashing, Window Edge/Trim, per 2025 Water seepage reported at windows during rain season. Provide gashing Poor 35 ' 0 $ 5,018 $ - $ 5,169 $ - $ - $ - $ - $ - $ - $ - $ Community Center 12 SF Window (or 14 LF), Replace and positive slope away from the building.
Security/Surveillance System,
Bradford Avenue D7030 Lease Costs for 2025 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ 12,360 $ $ - $ - $ - $ - $ - $ - $ Pedestrian Bridge Security/Surveillance System,
Lease
Security/Surveillance System,
Aguirre D7030 Lease Costs for 2025 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ 12,360 $ $ - $ - $ - $ - $ - $ - $ Community Center Security/Surveillance System,
Lease
Champions Sports Security/Surveillance System,
Park - Snack D7030 Lease Costs for 2025 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ 12,360 $ $ - $ - $ - $ - $ - $ - $ Shack Security/Surveillance System,
Lease
Security/Surveillance System,
City Corporate
07030 Lease Costs for 2025 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ 12,360 $ $ - $ - $ - $ - $ - $ - $ Yard Building Security/Surveillance System,
Lease
Security/Surveillance System,
City Hall (with D7030 Lease Costs for 2025 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ 12,360 $ $ - $ - $ - $ - $ - $ - $ Police Station) Security/Surveillance System,
Lease
Security/Surveillance System,
Fire Station 1 D7030 Lease Costs for 2025 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ 12,360 $ $ - $ - $ - $ - $ - $ - $ Security/Surveillance System,
Lease
Security/Surveillance System,
Fire Station 2 D7030 Lease Costs for 2025 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ 12,360 $ $ - $ - $ - $ - $ - $ - $ Security/Surveillance System,
Lease
Security/Surveillance System,
Backs Community 07030 Lease Costs for 2025 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ 12,360 $ $ - $ - $ - $ - $ - $ - $ Center Security/Surveillance System,
Lease
Security/Surveillance System,
Whitten D7030 Lease Costs for 2025 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ 12,360 $ $ - $ - $ - $ - $ - $ - $ Community Center Security/Surveillance System,
Lease
Security/Surveillance System,
Old City Hall D7030 Lease Costs for 2025 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ 12,360 $ $ - $ - $ - $ - $ - $ - $ Security/Surveillance System,
Lease
Security/Surveillance System,
Gomez D7030 Lease Costs for 2025 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ 12,360 $ $ - $ - $ - $ - $ - $ - $ Community Center Security/Surveillance System,
Lease
Security/Surveillance System,
Placentia Teen D7030 Lease Costs for 2025 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ 12,360 $ $ - $ - $ - $ - $ - $ - $ Center Security/Surveillance System,
Lease
Pole Light Fixture w/ Lamps, any
Fire Station 2 G4050 type 20' High, w/ LED 2026 Client reported that all exterior lighting needs to be upgraded. Poor 60 2 $ 26,880 $ $ - $ 28,517 $ - $ - $ - $ - $ - $ - $ Replacement, Replace/Install
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating PScoriorityre URemsefuail Lifening Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 1 2032 ■ 2033
Parque de Los Electrical System, Full System
Vaqueros - D5020 Renovation/Upgrade, Low 2026 Electrical system is old and worn. Has corrosion on some of the panels. Poor 60 2 $ 41,600 $ $ - $ 44,133 $ - $ - $ Restroom Building Density/Complexity, Replace
Parque de Los D5030 Motor, AHU or Pump, Replace 2026 Highly corroded components Poor 60 2 $ 6,400 $ - $ - $ 6,790 $ - $ - $ Vaqueros - Site
Parque de Los Pole Light Fixture w/ Lamps, any
Vaqueros -Site G4050 type 20' High, w/ LED 2026 Some lights have had wires removed/stolen Poor 60 2 $ 192,000 $ $ - $ 203,693 $ - $ - $ Replacement, Replace/Install
Parque del Arroyo Interior Lighting System, Full
Verde - Restroom D5040 Upgrade, Low Density & Standard 2026 Light cover is missing Poor 60 2 $ 3,192 $ $ - $ 3,386 $ - $ - $ Building Fixtures, Replace
Parque del Arroyo Exterior Fixture w/ Lamp, any type,
Verde -Restroom G4050 w/ LED Replacement, Replace 2026 Cover is missing from fixture Poor 60 2 $ 5,760 $ $ - $ 6,111 $ - $ - $ Building
Parque del Arroyo D5020 Switchboard, 120/208 V, Replace 2026 Highly rusted at the base Poor 60 2 $ 128,000 $ $ - $ 135,795 $ - $ - $ Verde - Site
Tynes Gym D3050 HVAC System, Ductwork, Medium 2026 Corrosion and rust found Poor 60 2 $ 83,200 $ $ - $ 88,267 $ - $ - $ Density, Replace
Kreemer Memorial D2010 Sink/Lavatory, Vanity Top, 2026 The unit is not fully operational, replacement is recommended. Poor 55 2 $ 3,840 $ $ - $ 4,074 $ - $ - $ Park - Site Stainless Steel, Replace
Parque de Los D2010 Drinking Fountain, Exterior/Site, 2026 Issues with pressure and operation Poor 55 2 $ 4,800 $ $ - $ 5,092 $ - $ - $ Vaqueros - Site Metal Pedestal, Replace
Bradford Park G2060 Trash Receptacle, Medium -Duty 2026 Very rusted metal containers Poor 50 2 $ 6,720 $ $ - $ 7,129 $ - $ - $ Metal or Precast, Replace
Goldenrod Park G2060 Trash Receptacle, Medium -Duty 2026 Bent metal. Highly rusted Poor 50 2 $ 13,440 $ $ - $ 14,258 $ - $ - $ Metal or Precast, Replace
Goldenrod Park G2080 Irrigation System, Control Panel, 2026 Highly corroded equipment Poor 50 2 $ 16,000 $ $ - $ 16,974 $ - $ - $ Replace
Koch Park - Site G2030 Sidewalk, Concrete, Small 2026 Sidewalks are uneven and cracking. Poor 50 2 $ 25,600 $ $ - $ 27,159 $ - $ - $ Areas/Sections, Replace
Koch Park - Site G2060 Signage, Property, Building or Pole 2026 Property Signage is aged and shows rotten signs Poor 50 2 $ 4,800 $ $ - $ 5,092 $ - $ - $ Mounted, Replace/Install
Parque de Los G2050 Sports Apparatus, Baseball, 2026 Chain link are showing signs of aging and rusting. Poor 50 2 $ 16,000 $ $ - $ 16,974 $ - $ - $ Ninos- Site Backstop Chain -Link, Replace
Parque de Los G2050 Sports Apparatus, Player/Dugout 2026 The benches are showing signs of aging and rusting Poor 50 2 $ 2,880 $ $ - $ 3,055 $ - $ - $ Ninos - Site Benches, 12' Length, Replace
Parque de Los G2030 Sidewalk, Concrete, Large Areas, 2026 High surface cracking. Root systems are damaging concrete sidewalks Poor 50 2 $ 216,000 $ $ - $ 229,154 $ Vaqueros - Site Replace
Parque de Los Park Bench,
Vaqueros - Site G2060 Wood/Composite/Fiberglass, 2026 Cracks in material. Poor 50 2 $ 15,360 $ $ - $ 16,295 $ - $ - $ Replace
Parque de Los Irrigation System, Pop -Up Spray
Vaqueros -Site G2080 Heads, Commercial, 2026 Some spray heads are damaged Poor 50 2 $ 800,000 $ $ - $ 848,720 $ Replace/Install
$ -
$ _ $
$ _ $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost
Score Useful Life
2024 2025 2026 2027 2028 2029 2030
2031 1 2032 ■ 2033
Tuffree Park - Site G2060 Flagpole, Metal, Replace 2026 Rust and corrosion found Pole is bent Poor 50 2 $ 8,000 $ Edwin T. Powell D7050 Fire Alarm Panel, Multiplex, 2026 0 Fair 40 2 $ 12,800 $ Building Replace
Parque de Los Play Structure, Multipurpose,
Vaqueros - Site G2050 Medium, Replace 2026 0 Fair 40 2 $ 64,000 $ Wagner Park G2050 Pleyfield Surfaces, Chips Wood, 3" 2026 0 Fair 40 2 $ 16,640 $ Depth, Replace
Types Gym C1070 Suspended Ceilings, Acoustical 2026 Water damage to tiles from a leak is present Poor 35 2 $ 67,200 $ Tile (ACT), Replace
Tynes Gym C2010 WPaintall Finishes, any surface, Prep & 2026 Faded paint Scuffs Poor 35 2 $ 54,000 $ Security/Surveillance System,
Bradford Avenue D7030 Lease Costs for 2026 Operational lease costs (annual) NA 30 0 $ 12,000 $ Pedestrian Bridge Security/Surveillance System,
Lease
Security/Surveillance System,
Aguirre D7030 Lease Costs for 2026 Operational lease costs (annual) NA 30 0 $ 12,000 $ Community Center Security/Surveillance System,
Lease
Champions Sports Security/Surveillance System,
Park - Snack D7030 Lease Costs for 2026 Operational lease costs (annual) NA 30 0 $ 12,000 $ Shack Security/Surveillance System,
Lease
Security/Surveillance System,
City Corporate D7030 Lease Costs for 2026 Operational lease costs (annual) NA 30 0 $ 12,000 $ Yard Building Security/Surveillance System,
Lease
Security/Surveillance System,
City Hall (with D7030 Lease Costs for 2026 Operational lease costs (annual) NA 30 0 $ 12,000 $ Police Station) Security/Surveillance System,
Lease
Security/Surveillance System,
Fire Station 1 D7030 Lease Costs for 2026 Operational lease costs (annual) NA 30 0 $ 12,000 $ Security/Surveillance System,
Lease
Security/Surveillance System,
Fire Station 2 D7030 Lease Costs for 2026 Operational lease costs (annual) NA 30 0 $ 12,000 $ Security/Surveillance System,
Lease
Security/Surveillance System,
Backs Community D7030 Lease Costs for 2026 Operational lease costs (annual) NA 30 0 $ 12,000 $ Center Security/Surveillance System,
Lease
Security/Surveillance System,
Whitten D7030 Lease Costs for 2026 Operational lease costs (annual) NA 30 0 $ 12,000 $ Community Center Security/Surveillance System,
Lease
Security/Surveillance System,
Old City Hall D7030 Lease Costs for 2026 Operational lease costs (annual) NA 30 0 $ 12,000 $ Security/Surveillance System,
Lease
Security/Surveillance System,
Gomez D7030 Lease Costs for 2026 Operational lease costs (annual) NA 30 0 $ 12,000 $ Community Center Security/Surveillance System,
Lease
Security/Surveillance System,
Placentia Teen D7030 Lease Costs for 2026 Operational lease costs (annual) NA 30 0 $ 12,000 $ Center Security/Surveillance System,
Lease
Champions Sports Exhaust Fan, Centrifugal, 16" Considenng the age of the building, it appears that the unit has exceeded Park - Snack D3060 Damper, 1001 to 2000 CFM, 2026 its expected life, necessitating replacement Fair 30 2 $ 7,680 $ Shack Replace
$ 8,487 $ - $ - $ - $ - $ - $ - $
$ 13,580 $ - $ - $ - $ - $ - $ - $
$ 67,898 $ - $ - $ - $ - $ - $ - $
$ 17,653 $ - $ - $ - $ - $ - $ - $
$ 71,292 $ - $ - $ - $ - $ - $ - $
$ 57,289 $ - $ - $ - $ - $ - $ - $
$ 12,731 $ - $ - $ - $ - $ - $ - $
$ 12,731 $ - $ - $ - $ - $ - $ - $
$ 12,731 $ - $ - $ - $ - $ - $ - $
$ 12,731 $ - $ - $ - $ - $ - $ - $
$ 12,731 $ - $ - $ - $ - $ - $ - $
$ 12,731 $ - $ - $ - $ - $ - $ - $
$ 12,731 $ - $ - $ - $ - $ - $ - $
$ 12,731 $ - $ - $ - $ - $ - $ - $
$ 12,731 $ - $ - $ - $ - $ - $ - $
$ 12,731 $ - $ - $ - $ - $ - $ - $
$ 12,731 $ - $ - $ - $ - $ - $ - $
$ 12,731 $ - $ - $ - $ - $ - $ - $
$ 8,148 $ - $ - $ - $ - $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority
Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 al. 2032 2033 City Corporate 03050 Supplemental Components, Air 2026 Currently not used by facility as it tied with the unleaded underground fuel Fair 30 2 $ 6,336 $ - $ Yard Building Separator, HVAC, Replace tank which is non functional due to leakage Edwin T. Powell D5010 Supplemental Components, 2026 0 Fair 30 2 $ 5,216 $ - $ Building Battery Charger, Replace
Edwin T. Powell Electrical System, Wiring &
Building D5030 Switches, High 2026 0 Fair 30 2 $ 60,570 $ $ Density/Complexity, Replace
Edwin T. Powell D5040 Emergency & Exit Lighting, Full 2026 0 Fair 30 2 $ 9,843 $ - $ Building Interior Upgrade, to LED, Upgrade
Gomez 03030 Split System, Fan Coil Unit, DX, 2026 0 Fair 30 2 $ 14,720 $ $ Community Center Replace
Gomez D3030 Spit System, Condensing 2026 0 Fair 30 2 $ 12,800 $ $ Community Center Unit/Heat Pump, Replace
Gomez D5020 Switchboard, 120/208 V, Replace 2026 0 Fair 30 2 $ 128,000 $ $ Community Center
Parque de Los Interior Lighting System, Full
Vaqueros - D5040 Upgrade, Low Density & Standard 2026 0 Fair 30 2 $ 6,720 $ - $ Restroom Building Fixtures, Replace
Parque de Los Exterior Fixture w/ Lamp, any type,
Vaqueros - G4050 w/ LED Replacement, Replace 2026 0 Fair 30 2 $ 7,680 $ - $ Restroom Building
Placentia Avenue Interior Lighting System, Full
Storm Water D5040 Upgrade, Low Density & Standard 2026 0 Fair 30 2 $ 5,107 $ $ Pump Station Fixtures, Replace
Tuffree Park - Site D5020 Switchboard, 120/208 V, Replace 2026 0 Fair 30 2 $ 128,000 $ $ Tynes Gym 05020 Secondary Transformer, Dry, 2026 0 Fair 30 2 $ 24,320 $ Slepdown, Replace
Electrical System, Wiring &
Tynes Gym D5030 Switches, Average or Low 2026 Highly aged and corroded Fair 30 2 $ 52,000 $ Density/Complexity, Replace
Tynes Gym 02010 Single-LeDrinking Fovel, unRepltain, ace Wall -Mounted, 2026 Highly aged Fair 25 2 $ 7,680 $ Champions Sports Athletic Surfaces & Courts,
Park - Site G2050 Basketball/General, Asphalt 2026 0 Fair 20 2 $ 9,936 $ Pavement, Seal & Stripe
Champions Sports G2050 Camping/Picnic Accessories, Grill, 2026 0 Fair 20 2 $ 1,920 $ Park - Site Pedestal -Style, Replace
City Corporate 02050 Exterior Door, Wood, Solid -Core, 2026 0 Fair 20 2 $ 2,240 $ Vard Building Replace
City Corporate 02050 Exterior Door, Steel, Standard, 2026 0 Fair 20 2 $ 11,520 $ Vard Building Replace
City Corporate Exterior Door, Aluminum -Framed
Yard Building B2050 & Glazed, Standard Swing, 2026 0 Fair 20 2 $ 8,320 $ Replace
$ 6,722 $ - $ - $ - $ - $ - $ - $
$ 5,534 $ - $ - $ - $ - $ - $ - $
$ 64,259 $ - $ - $ - $ $ - $ - $
$ 10,442 $ - $ - $ - $ - $ - $ - $
$ 15,616 $ - $ - $ - $ - $ - $ - $
$ 13,580 $ - $ - $ - $ - $ - $ - $
$ 135,795 $ - $ - $ - $ - $ - $ - $
$ 7,129 $ - $ - $ - $ - $ - $ - $
$ 8,148 $ - $ - $ - $ - $ - $ - $
$ 5,418 8 - $ - $ - $ - $ - $ - $
$ 135,795 $ - $ - $ - $ - $ - $ - $
$ 25,801 $ - $ - $ - $ - $ - $ - $
$ 55,167 $ - $ - $ - $ - $ - $ - $
$ 8,148 $ - $ - $ - $ - $ - $ - $
$ 10,541 $ - $ - $ - $ - $ - $ - $
$ 2,037 $ - $ - $ - $ - $ - $ - $
$ 2,376 $ - $ - $ - $ - $ - $ - $
$ 12,222 $ - $ - $ - $ - $ - $ - $
$ 8,827 $ - $ - $ - $ - $ - $ - $
Building
Uniform at
Code
Cost Description
Project
Year
Comments
Rating PScore Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 al. 2032 2033 Edwin T. Powell
Building
Edwin T. Powell
Building
Parque de Los
Vaqueros - Site
Parque de Los
Vaqueros - Site
Parque de Los
Vaqueros - Site
Park Bench,
G2060 Wood/Composite/Fiberglass,
Replace
2026
G2080 Irrigation System, Control Panel, 2026
Replace
Picnic Table,
G2060 Wood/Composite/Fiberglass,
Replace
2026
G2080 Irrigation System, Control Panel, 2026
Replace
Irrigation System, Controllers &
G2080 Valves, Repairs & Adjustments, 2026
Repair
Aguirre C2050 Ceiling Finishes, exposed irregular 2026
Community Center elements, Prep & Paint
City Corporate
Yard Building
C2010 Wall Finishes, any surface, Prep & 2026
Paint
Backs Community C2050 Ceiling Finishes, any fiat surface, 2026 Center Prep & Paint
Bradford Avenue 04030 Fire Extinguisher, Wet
Pedestrian Bridge Chemical/CO2, Replace
Aguirre 04030 Fire Extinguisher, Wet
Community Center Chemical/CO2, Replace
Champions Sports Fire Extinguisher, Wet
Park - Snack 04030 Chemical/CO2, Replace
Shack
2027
2027
2027
Jaycee Parkette G2050 Playfield Surfaces, Sand, 3" Depth, 2027 Replace
McFadden Park- G2050 Play Structure, Swing Set, 4 Seats, 2027 Site Replace
McFadden Park- G2050 Play Structure, Multipurpose,
Site Large, Replace
2027
Aguirre B3060 Roof Skylight, per one, up to 20 2027
Community Center SF, Replace
Champions Sports Roof Skylight, per one, up to 20
Park - Snack 03060 SF, Replace
Shack
City Corporate
Yard - Open
Garage
B3010 Roofing, Metal, Replace
2027
2027
Whitten B3010 Roofing, Single -Ply Membrane, 2027
Community Center EPDM, Replace
Whitten B3060 Roof Skylight, per unit, up to 20
Community Center SF, Replace
2027
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair
O Fair
O Fair 10
O Fair 40
O Fair 40
O Fair 40
O Fair 40
O Fair 40
O Fair 40
O Fair 35
O Fair 35
O Fair 35
O Fair 35
O Fair 35
2 $ 1,920 $ - $
2 $ 16,000 $ - $
2 $ 23,040 $ - $
2 $ 16,000 $ - $
2 $ 320,000 $ - $
2 $ 8,920 $ - $
2 $ 28,800 $ - $
2 $ 2,560 $ - $
3 $ 1,920 $ - $
3 $ 1,920 $ - $
3 $ 2,880 $ - $
3 $ 7,680 $
3 $ 8,000 $
3 $ 112,000 $
3 $ 12,480 $
3 $ 16,640 $
3 $ 337,792 $
3 $ 154,880 $
3 $ 12,480 $
$ 2,037 $ - $ - $
$ 16,974 $ - $ - $
$ 24,443 $ - $ - $
$ 16,974 $ - $ - $
$ 339,488 $ - $ - $
$ 9,463 $ - $ - $
$ 30,554 $ - $ - $
$ 2,716 $ - $ - $
$ - $ 2,098 $ - $
$ - $ 2,098 $ - $
$ - $ 3,147 $ - $
$ $ 8,392 $ - $
$ $ 8,742 $ - $
$ - $ 122,385 $ - $
$ $ 13,637 $ - $
$ $ 18,183 $ - $
$ $ 369,114 $ - $
$ - $ 169,242 $ - $
$ $ 13,637 $ - $
$ _ $
$ _ $
$
$ _ $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Score Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 ■ 2033
Tynes Gym B3010 Roofing, Metal, Replace
Bradford Avenue
Pedestrian Bridge
Aguirre
Community Center
Champions Sports
Park - Snack
Shack
City Corporate
Yard Building
City Hall (with
Police Station)
Fire Station 1
Fire Station 2
Backs Community
Center
Whitten
Community Center
D7030
D7030
D7030
D7030
D7030
D7030
D7030
D7030
D7030
Old City Hall D7030
Gomez
Community Center
Placentia Teen
Center
D7030
D7030
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Bradford Avenue D2010 Pump, Circulation, Domestic
Pedestrian Bridge Water, Replace
Bradford Avenue D2010 Pump, Circulation, Domestic
Pedestrian Bridge Water, Replace
2027
2027 Operational lease costs (annual)
2027 Operational lease costs (annual)
2027 Operational lease costs (annual)
2027 Operational lease costs (annual)
2027 Operational lease costs (annual)
2027 Operational lease costs (annual)
2027 Operational lease costs (annual)
2027 Operational lease costs (annual)
2027 Operational lease costs (annual)
2027 Operational lease costs (annual)
2027 Operational lease costs (annual)
2027 Operational lease costs (annual)
2027
2027
Aguirre D3050 HVAC System, Ductwork, Medium 2027
Community Center Density, Replace
Aguirre D5020 Distribution Panel, 120/208 V,
Community Center Replace
Aguirre Interior Lighting System, Full
Community Center D5040 Upgrade, Medium Density &
Standard Fixtures, Replace
Aguirre D5040 Emergency 8 Exit Lighting, Exit
Community Center Sign, LED, Replace
2027
2027
2027
O Fair 35 3 $ 34,944 $ $ - $ - $ 38,184 $ - $ - $ - $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ 13,113 $ - $ - $ - $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ 13,113 $ - $ - $ - $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ 13,113 $ - $ - $ - $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ 13,113 $ - $ - $ - $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ 13,113 $ - $ - $ - $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ 13,113 $ - $ - $ - $ - $ - $ NA 30 0 $ 12,000 $ $ - $ $ 13,113 $ - $ - $ - $ - $ - $ NA 30 0 $ 12,000 $ $ - $ $ 13,113 $ - $ - $ - $ - $ - $ NA 30 0 $ 12,000 $ $ - $ $ 13,113 $ - $ - $ - $ - $ - $ NA 30 0 $ 12,000 $ $ - $ $ 13,113 $ - $ - $ - $ - $ - $ NA 30 0 $ 12,000 $ $ - $ $ 13,113 $ - $ - $ - $ - $ - $ NA 30 0 $ 12,000 $ $ - $ $ 13,113 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 8,320 $ $ - $ $ 9,091 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 8,320 $ $ - $ $ 9,091 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 36,032 $ $ - $ - $ 39,373 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 19,200 $ $ - $ - $ 20,980 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 40,536 $ $ - $ - $ 44,295 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 2,816 $ $ - $ - $ 3,077 $ - $ - $ - $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Score Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 1 2032 ■ 2033
- ns Sports
Park HVAC System, Ductwork, Medium
Parknack D3050 Density, Replace 2027
Shack
Champions Sports Secondary Transformer, Dry,
Park - Snack D5020 2027
Stepdown, Replace
Shack
Champions Sports Distribution Panel, 277/480 V, 400
Park - Snack D5020 AMP, Replace 2027
Shack
Champions Sports Emergency & Exit Lighting, Exit
Park - Snack D5040 Sign, LED, Replace 2027
Shack
Champions Sports Interior Lighting System, Full
Parc - Snack D5040 Upgrade, Medium Density & 2027
Shack Standard Fixtures, Replace
City Corporate
Yard Building
D2010 Emergency Plumbing Fixtures, Eye 2027
Wash & Shower Station, Replace
City Corporate Secondary Transformer, Dry,
Vard - Open D5020 2027
Stepdown, Replace
Garage
City Corporate Distribution Panel, 120/208 V,
Vard - Open D5020 2027
Replace
Garage
City Corporate Electncal System, Wiring &
Yard - Open D5030 Switches, Average or Low
Garage Density/Complexity, Replace
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
2027
D2060 Air Compressor, Tank -Style, 2027
Replace
D3030 Ch0ler,Water-Cooled, 81 to 100 2027
TON, Replace
D3030 Cooling Tower, (Typical) Open 2027
Circuit, Replace
D3050 Packaged Unit, RTU, Pad or Roof- 2027
Mounted, Replace
D3050 Air Handler, Interior AHU, 2027
Easy/Moderate Access, Replace
D3050 Packaged Unit, RTU, Pad or Roof- 2027
Mounted, Replace
D3050 Air Handler, Interior AHU, 2027
Easy/Moderate Access, Replace
D3050 Packaged Unit, RTU, Pad or Roof- 2027
Mounted, Replace
D3050 Air Handler, Interior AHU, 2027
Easy/Moderate Access, Replace
D3060
Exhaust Fan, Roof or Wall -
Mounted, 16" Damper, Replace
2027
O Fair 30 3 $ 29,568 $ $ - $ - $ 32,310 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 32,000 $ $ - $ - $ 34,967 $ - $ - $ $ - $ - $ O Fair 30 3 $ 16,960 $ $ - $ - $ 18,533 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 2,112 $ $ - $ - $ 2,308 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 33,264 $ $ - $ - $ 36,348 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 7,360 $ $ - $ - $ 8,042 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 21,440 $ $ - $ - $ 23,428 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 6,400 $ $ - $ - $ 6,993 $ - $ - $ - $ - $ - $ 0 Fair 30 3 $ 64,960 $ $ - $ - $ 70,984 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 23,264 $ $ - $ - $ 25,421 $ - $ - $ $ - $ - $ O Fair 30 3 $ 359,040 $ $ - $ - $ 392,333 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 32,640 $ $ - $ - $ 35,667 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 21,216 $ $ - $ - $ 23,183 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 101,184 $ $ - $ - $ 110,566 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 17,952 $ $ - $ - $ 19,617 $ - $ - $ - $ - $ - $ 0 Fair 30 3 $ 101,184 $ $ - $ - $ 110,566 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 17,952 $ $ - $ $ 19,617 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 101,184 $ $ - $ - $ 110,566 $ - $ - $ - $ - $ - $ O Fair 30 3 $ 7,834 $ $ - $ $ 8,560 $ - $ - $ - $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating siority Remaining
core Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 al. 2032 2033 City Hall (with D5010 Uninterrupfible Power Supply, 2027 0 Fair 30 3 $ 5,120 $ - $ - $ - $ 5,595 $ - $ - $ - $ - $ - $ Police Station) Individual Battery, Replace
Edwin T. Powell Plumbing System, Supply & Given the significant age of the building and recent reports of plumbing Building D2010 Sanitary, Medium Density 2027 issues from the facility, it is important to replace and upgrade plumbing Fair 30 3 $ 166,566 $ $ - $ - $ 182,011 $ - $ - $ - $ - $ - $ (excludes fixtures), Replace system.
Edwin T. Powell D3030 Air Conditioner, Window/Thru- 2027 0 Fair 30 3 $ 1,600 $ - $ - $ - $ 1,748 $ - $ - $ - $ - $ - $ Building Wall, Residential, Replace
Edwin T. Powell D3030 Air Conditioner, Window/Thru- 2027 0 Fair 30 3 $ 7,040 $ - $ - $ - $ 7,693 $ - $ - $ - $ - $ - $ Building Wall, Replace
Fire Station 2 D2010 Water Heater, Gas, Tankless, 6.5 2027 0 Fair 30 3 $ 6,400 $ - $ - $ - $ 6,993 $ - $ - $ - $ - $ - $ to 9 5 GPM, Replace
Fire Station 2 D2010 Water Heater, Gas, Tankless, 6.5 2027 0 Fair 30 3 $ 6,400 $ $ - $ - $ 6,993 $ - $ - $ - $ - $ - $ to 9 5 GPM, Replace
Fire Station 2 D3050 Packaged Unit, RTU, Pad or Roof- 2027 0 Fair 30 3 $ 35,200 $ $ - $ - $ 38,464 $ - $ - $ - $ - $ - $ Mounted, Replace
Fire Station 2 D3050 Packaged Unit, RTU, Pad or Roof- 2027 0 Fair 30 3 $ 24,000 $ $ - $ - $ 26,225 $ - $ - $ - $ - $ - $ Mounted, Replace
Electncel System, Wiring &
Fire Station 2 D5030 Switches, Average or Low 2027 0 Fair 30 3 $ 40,800 $ $ - $ - $ 44,583 $ - $ - 5 - $ - $ - $ Density/Complexity, Replace
Koch Park Plumbing System, Supply &
Community Center D2010 Sanitary, Medium Density 2027 0 Fair 30 3 $ 57,728 $ $ - $ - $ 63,081 $ - $ - $ - $ - $ - $ (excludes fixtures), Replace
Backs Community D3050 Air Handler, Interior AHU, 2027 0 Fair 30 3 $ 224,000 $ $ - $ - $ 244,771 $ - $ - $ - $ - $ - $ Center Easy/Moderate Access, Replace
Backs Community D5020 Switchboard, 120/208 V, Replace 2027 0 Fair 30 3 $ 160,000 $ $ - $ - $ 174,836 $ - $ - $ - $ - $ - $ Center
Backs Community D5020 Distribution Panel, 120/208 V, 2027 This asset is 24 years beyond the end of its expected useful life Fair 30 3 $ 6,400 $ $ - $ - $ 6,993 $ - $ - $ - $ - $ - $ Center Replace
Backs Community Electncal System, Wiring &
Center D5030 Switches, Average or Low 2027 0 Fair 30 3 $ 85,728 $ $ - $ - $ 93,677 $ - $ - $ - $ - $ - $ Density/Complexity, Replace
McFadden Park - Emergency Plumbing Fixtures, Eye
Pool Equipment D2010 Wash &Shower Station, Replace 2027 0 Fair 30 3 $ 7,360 $ $ - $ - $ 8,042 $ - $ - $ - $ - $ - $ Building
McFadden Park - Interior Lighting System, Full
Pool Equipment D5040 Upgrade, Low Density & Standard 2027 0 Fair 30 3 $ 4,200 $ $ - $ $ 4,589 $ - $ - $ - $ - $ - $ Building Fixtures, Replace
McFadden Park - Interior Lighting System, Full
Restroom Building D5040 Upgrade, Low Density & Standard 2027 0 Fair 30 3 $ 4,536 $ $ - $ $ 4,957 $ - $ - $ - $ - $ - $ Fixtures, Replace
Whitten D3050 Packaged Unit, RTU, Pad or Roof- 2027 0 Fair 30 3 $ 48,000 $ $ - $ $ 52,451 $ - $ - $ - $ - $ - $ Community Center Mounted, Replace
Whitten D3050 Packaged Unit, RTU, Pad or Roof- 2027 0 Fair 30 3 $ 24,000 $ $ - $ $ 26.225 $ - $ - $ - $ - $ - $ Community Center Mounted, Replace
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating PScore Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 al. 2032 2033 Whitten D3050 Packaged Unit, RTU, Pad or Roof- 2027
Community Center Mounted, Replace
Whitten D3050 Packaged Unit, RTU, Pad or Roof -
2027
Community Center Mounted, Replace
Whitten D3050 Packaged Unit, RTU, Pad or Roof- 2027
Community Center Mounted, Replace
Whitten D3050 Packaged Unit, RTU, Pad or Roof- 2027
Community Center Mounted, Replace
Whitten D3050 Packaged Unit, RTU, Pad or Roof- 2027
Community Center Mounted, Replace
Melrose Storm Exhaust Fan, Roof or Wall -
Water Pump D3060 Mounted, 12" Damper, Replace
Station
Melrose Storm
Water Pump
Station
2027
D5030 Venable Frequency Drive, VFD, by 2027 Capacity assumed HP of Motor, 25 HP, Replace
Melrose Storm Circulation Pump, Circulation
Water Pump D5030 pump, Replace
Station
Melrose Storm Circulation Pump, Circulation
Water Pump D5030 pump, Replace
Station
Melrose Storm
Water Pump
Station
2027
2027
Interior Lighting System, Full
D5040 Upgrade, Medium Density & 2027
Standard Fixtures, Replace
Melrose Storm Exterior Fixture w/ Lamp, any type,
Water Pump G4050 2027
w/ LED Replacement, Replace
Station
Gomez D2010 Water Heater, Gas, Residential, 2027
Community Center Replace
Gomez D3030 Split System, Condensing
Community Center Unit/Heat Pump, Replace
2027
Gomez D3030 Split System, Fan Coil Unit, DX, 2027
Community Center Replace
Parque de Los
Ninos - Pool
Building
Electncal System, Wiring &
D5030 Switches, Average or Low
Density/Complexity, Replace
2027
Parque de Los Plumbing System, Supply &
Vaqueros - D2010 Sanitary, Low Density (excludes 2027
Restroom Building fixtures), Replace
Tuffree Park - Site D5030 Motor, AHU or Pump, Replace 2027 Bradford Park
D2010 Drinking Fountain, Exterior/Site,
Precast Pedestal, Replace
2027
Aguirre D2010 Drinking Fountain, Exterior/Site, 2027
Community Center Metal Pedestal, Replace
O Fair 30 3 $ 35,200 $ $ - $
O Fair 30 3 $ 35,200 $ - $ - $
O Fair 30 3 $ 35,200 $ - $ - $
O Fair 30 3 $ 24,000 $ - $ - $
O Fair 30 3 $ 35,200 $ - $ - $
O Fair 30 3 $ 4,480 $ - $ - $
Fair 30 3 $ 39,680 $ $ - $
0 Fair 30 3 $ 45,440 $
O Fair 30 3 $ 45,440 $
O Fair 30 3 $ 5,184 $
O Fair 30 3 $ 1,920 $
O Fair 30 3 $ 4,160 $
O Fair 30 3 $ 22,720 $ $ - $
O Fair 30 3 $ 14,720 $ $ - $
O Fair 30 3 $ 4,440 $ $ - $
O Fair 30 3 $ 16,000 $ $ - $
O Fair 30 3 $ 6,400 $ $ - $
O Fair 25 3 $ 11,520 $ - $ - $
O Fair 25 3 $ 4,800 $ - $ - $
$ 38.464 $ - $ - $ - $
$ 38.464 $ - $ - $ - $
$ 38.464 $
$ 26225 $
$ $ - $
$ 38,464 $ - $ - $ - $
4,895 $ - $ - $ - $
$ 43,359 $ - $ - $ - $
$ 49,654 $ - $ - $ - $
$ 49,654 $ - $
$ 5,665 $ - $
$ _ $
$ -
$ 2,098 $ - $ - $ - $
4,546 $ - $ - $ - $
- $ 24,827 $ - $ - $ - $
- $ 16,085 $ - $ - $ - $
- $ 4,852 $ - $
- $ 17,484 $ - $
$ _ $
$ -
- $ 6,993 $ - $ - $ - $
- $ 12,588 $ - $ - $ - $
- $ 5,245 $ - $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost
Score Useful Life
2024 2025 2026 2027 2026 2029 2030
2031 1 2032 ■ 2033
City Corporate
Yard Building
City Hall (with
Police Station)
D2010 Drinking Fountain, Exterior/Site,
Metal Pedestal, Replace
2027
D2010 Drinking Fountain, Wall -Mounted, 2027
Single -Level, Replace
McFadden Park - D2010 Drinking Fountain, Exterior/Site, Site Metal Pedestal, Replace
2027
McFadden Park- D2010 Shower, Enameled Steel, Replace 2027 Site
Parque de Los
Ninos - Site
Placentia Teen
Center
D2010 Drinking Fountain, Exterior/Site,
Metal Pedestal, Replace
D2010 Sink/Lavatory, Wall -Hung,
Vitreous China, Replace
Aguirre 82020 Window, Wood, 16-25 SF,
Community Center Replace
2027
2027
2027
Aguirre B2050 Exterior Door, Wood, Solid -Core, 2027
Community Center Replace
Champions Sports Shed/Gazebo/Shade Structure,
Park - Site F1020 Wood or Metal -Framed,
Basic/Minimal, Replace
2027
Parking Lots, Pavement, Asphalt, 2027
Champions Sports G2020
Park - Site Seal&stripe
Parking Lots, Pavement, Asphalt, 2027
Champions Sports G2020
Park - Site Seal&stripe
Champions Sports G2050 Sports Apparatus, Basketball, 2027 Park - Site Backboard/Rim/Pole, Replace
Champions Sports G2060 Trash Receptacle, Medium -Duty 2027 Park - Site Metal or Precast, Replace
Champions Sports G2060 Picnic Table, Metal Powder -
Park - Site Coated, Replace
Champions Sports G2060 Picnic Table, Metal Powder -
Park - Site Coated, Replace
Champions Sports G2060 Bike Rack, Fixed 1-5 Bikes,
Park - Site Replace
2027
2027
2027
Champions Sports G2060 Trash Receptacle, Medium -Duty 2027 Park - Site Metal or Precast, Replace
Champions Sports G2060 Trash Receptacle, Medium -Duty 2027 Park - Site Metal or Precast, Replace
Champions Sports G2060 Bike Rack, Fixed 1-5 Bikes,
Park - Site Replace
2027
O Fair 25
O Fair 25
O Fair 25
O Fair 25
O Fair 25
O Fair 25
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
3 $ 4,800 $ - $ - $
3 $ 11,520 $
3 5 9,600 $
3 5 8,640 $
3 5 4,800 $
3 $ 9,600 $
3 $ 34,560 $
3 8 8,960 $
3 $ 60,000 $
3 $ 19,008 $
3 $ 51,840 $
3 $ 91,200 $
3 $ 22,400 $
3 $ 4,480 $ - $ - $
3 $ 17,920 $ - $ - $
3 $ 3,840 $
3 5 8,960 $ - $ - $
3 $ 6,720 $ - $ - $
3 5 3,840 $ - $ - $
$ 5,245 $ - $ - $ - $
$ 12,588 $ - $ - $ - $
$ 10,490 $ - $ - $ - $
$ 9,441 $ - $ - $ - $
$ 5,245 $ - $ - $ - $
$ 10,490 $ - $ - $ - $
- $ 37,765 $ - $ - $ - $
$ 9,791 $ - $ - $ - $
- $ 65,564 $ - $
$ 20,771 $ - $
- $ 56,647 $ - $
- $ 99,657 $ - $
- $ 24,477 $ - $
- $ 4,895 $ - $
- $ 19,582 $ - $
- $ 4,196 $ - $
- $ 9,791 $ - $
- $ 7,343 $ - $
- $ 4,196 $ - $
$ -
$ $
$ -
$ -
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating siority Remaining
core Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 al. 2032 2033 Champions Sports Screens & Shutters, Rolling
Park - Snack 02020 Shutter, 10 to 50 SF, Replace
Shack
2027
Champions Sports Screens & Shutters, Rolling
Park - Snack B2020 Security Shutter, 55 to 100 SF, 2027 Shack Replace
Champions Sports Exterior Door, Wood, Solid-Core,Park-Snack 02050 Replace 2027 Shack
City Corporate
Yard Building
City Corporate
Vard Building
City Hall (with
Police Station)
City Hall (with
Police Station)
Edwin T. Powell
Building
Edwin T. Powell
Building
02050 Overhead/Dock Door, Aluminum, 2027
12'x12' (144 SF), Replace
02050 Overhead/Dock Door, Aluminum, 2027
20'x20' (400 SF), Replace
G2020 Parking Lots, Pavement, Asphalt, 2027
Seal & Stripe
G2020 Parking Lots, Pavement, Asphalt, 2027
Seal & Stripe
B2050 Exterior Door, Wood, Sohd-Core, 2027
Replace
C1030 Interior Door, Wood, Solid -Core, 2027
Replace
Edwin T. Powell G2020 Parking Lots, Pavement, Concrete, 2027 Building Crack Fill & Stripe
Irrigation System, Controllers &
Goldenrod Park G2080 Valves, Repairs & Adjustments, 2027 Repair
Kraemer Memorial
Park - Restroom C1090 Toilet Partitions, Metal, Replace 2027 Building
McFadden Park- C1090 Toilet Partitions, Plastic/Laminate, 2027 Restroom Building Replace
McFadden Park - Sports Apparatus, Exercise Station
Site G2050 Parks/Trails, Deluxe, Replace 2027
McFadden Park - G2050 Sports Apparatus, Player Bench, 2027 Site 12' Length, Replace
Whitten C1090 Toilet Partitions, PlastiGLaminate, 2027
Community Center Replace
Melrose Storni Pump Station, Sanitary Pump
Water Pump G2080 Station Pump Control Panel, 2027
Station Replace
Parque de Los
Ninos - Site
Parque de Los
Ninos - Site
Athletic Surfaces & Courts,
G2050 Basketball/General, Asphalt 2027
Pavement, Seal & Stripe
Athletic Surfaces & Courts,
G2050 Basketball/General, Asphalt 2027
Pavement, Seal & Stripe
O Fair 20 3 $ 19,200 $
O Fair 20 3 $ 12,800 $
O Fair 20 3 $ 6,720 $
O Fair 20 3 $ 14,080 $
O Fair 20 3 $ 192,000 $
O Fair 20 3 $ 111,600 $
O Fair 20 3 $ 13,824 $
O Fair 20 3 $ 6,720 $
O Fair 20 3 $ 22,400 $
O Fair 20 3 $ 2,660 $
O Fair 20 3 $ 141,850 $
O Fair 20 3 $ 10,880 $
O Fair 20 3 $ 7,200 $
O Fair 20 3 $ 38,400 $
O Fair 20 3 $ 2,880 $
O Fair 20 3 $ 19,200 $
O Fair 20 3 $ 17,600 $
O Fair 20 3 $ 4,147 $
O Fair 20 3 $ 3,197 $
$ - $ - $ 20,980 $ - $ - $ - $
- $ - $ - $ 13,987 $ - $ - $ - $
- $ - $ - $ 7,343 $ - $ - $ - $
$ - $ - $ 15,386 $ - $ - $ - $
$ - $ - $ 209,804 $ - $ - $ - $
$ - $ - $ 121,948 $ - $ - $ - $
- $ - $ $ 15,106 $ - $ - $ - $
$ - $ $ 7,343 $ - $ - $ - $
$- $ $ 24,477 $ - $ - - $
$ - $ $ 2,907 $
$ 155,003 $ - $ - $ - $
$ 11,889 $ - $ - $ - $
$ $ 7,868 $ - $ - $ - $
$ - $ 41,961 $ - $ - $ - $
$ - $ 3,147 $ - $ - $ - $
$ $ 20,980 $ - $ - $ - $
$ 19,232 $ - $ - $ - $
$ 4,532 $ - $ - $ - $
$ 3,493 $ - $ - $ - $
$ -
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost
Score Useful Life
2024 2025 2026 2027 2028 2029 2030
2031 1 2032 ■ 2033
Parque de Los
Ninos - Site
G2050 Sports Apparatus, Exercise Station 2027
Parks/Trails, Basic, Replace
Parque s Los
VExterior Door, Wire Mesh Metal,
Vaqueros- B2050 Gate, Replace 2027
Restroom Building
Parque del Arroyo Irrigation System, Controllers &
Verde - Site G2080 Valves, Repairs & Adjustments, 2027
Repair
Placentia Avenue Pump Station, Sanitary Pump
Storm Water G2080 Station Pump Control Panel, 2027
Pump Station Replace
TuOree Park - Site G2050 Benches, 12 Length, Replace
Sports Apparatus, Player/Dugout 2027
TUHree Park - Site G2050 Athletic Surfaces, Diamond Field, 2027 Infield Soil, Maintain
Tynes Gym
City Corporate
Vard Building
City Corporate
Yard Building
Edwin T. Powell
Building
G2050 Sports Apparatus, Scoreboard, 2027
Electronic Basic, Replace
E1010 Charging Station, Electric Vehicle, 2027
Single Connection, Replace
E1010 Charging Station, Electric Vehicle, 2027
Single Connection, Replace
Foodservice Equipment,
E1030 Refrigerator, 1 -Door Reach -In, 2027
Replace
Fire Station 2 E1060 Residential Appliances, Clothes
Dryer, Replace
2027
Fire Station 2 E1060 Residential Appliances, Washer, 2027 Replace
Placentia Teen E1030 Foodservice Equipment, Garbage 2027 Center Disposal, 1 to 3 HP, Replace
Aguirre C1070 Suspended Ceilings, Acoustical 2027
Community Center Tile (ACT), Replace
Aguirre Wall Finishes, any surface, Prep &
Community Center C2010 paint 2027
Aguirre
Community Center C2030 Flooring, Vinyl Tile (VCT), Replace 2027 Champions Sports Flooring, any surface, w/ Paint or
Park - Snack C2030 Sealant, Prep &Paint 2027
Shack
City Corporate
Vard Building
City Corporate
Yard Building
C1070 Suspended Ceilings, Acoustical 2027
Tile (ACT), Replace
C2030 Flooring, Vinyl Tile (VCT), Replace 2027
O Fair 20 3 $ 12,800 $ - $ - $ - $ 13,987 $ - $ - $ $ - $ - $ O Fair 20 3 $ 12,160 $ $ - $ - $ 13,288 $ - $ - $ $ - $ - $ O Fair 20 3 $ 195,200 $ $ - $ - $ 213,300 $ - $ - $ - $ - $ - $ O Fair 20 3 $ 17,600 $ $ - $ - $ 19,232 $ - $ - $ - $ - $ - $ O Fair 20 3 $ 5,760 $ $ - $ - $ 6,294 $ - $ - $ - $ - $ - $ O Fair 20 3 $ 38,400 $ - $ - $ - $ 41,961 $ - $ - $ - $ - $ - $ O Fair 20 3 $ 9,600 $ - $ - $ - $ 10,490 $ - $ - $ - $ - $ - $ O Fair 3 $ 12,800 $ - $ - $ - $ 13,987 $ - $ - $ - $ - $ - $ O Fair 3 $ 12,800 $ - $ - $ - $ 13,987 $ - $ - $ - $ - $ - $ O Fair 3 $ 8,640 $ - $ - $ - $ 9,441 $ - $ - $ - $ - $ - $ O Fair 3 $ 2,080 $ - $ - $ - $ 2,273 $ - $ - $ - $ - $ - $ O Fair 3 $ 2,720 $ - $ - $ - $ 2,972 $ - $ - $ - $ - $ - $ O Fair 3 $ 12,160 $ $ - $ - $ 13,288 $ - $ - $ - $ - $ - $ O Fair 10 3 $ 16,800 $ $ - $ - $ 18,358 $ - $ - $ - $ - $ - $ O Fair 10 3 $ 14,280 $ $ - $ - $ 15,604 $ - $ - $ - $ - $ - $ O Fair 3 $ 27,200 $ - $ - $ - $ 29,722 $ - $ - $ - $ - $ - $ O Fair 3 $ 4,320 $ - $ - $ - $ 4,721 $ - $ - $ - $ - $ - $ O Fair 3 $ 14,000 $ - $ - $ - $ 15,298 $ - $ - $ - $ - $ - $ O Fair 3 $ 36,800 $ - $ - $ - $ 40,212 $ - $ - $ - $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Score Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 1 2032 ■ 2033
Edwin T. Powell B2010 Exterior Walls, Stucco, Prep & 2027 Building Paint
Edwin T. Powell C2010 Wall Finishes, any surface, Prep & 2027 Building Paint
Edwin T. Powell
Building
C2050 eleCeilmingents, Finishes,Prep&exposedPaint irregular 2027 Backs Community C2030 Flooring, Vinyl Tile (VCT), Replace 2027 Center
Backs Community C2030 Flooring, Carpet, Commercial 2027 Center Standard, Replace
McFadden Park- C2010 Wall Finishes, any surface, Prep & 2027 Restroom Building Paint
Whitten Exterior Walls, Stucco, Prep & Fog
Community Center B2010 Coat or Paint, Prep & Fog Coat or 2027 Paint
Whitten
Community Center C2030 Flooring, Vinyl Sheeting, Replace 2027 Gomez Exterior Walls, Stucco, Prep & Fog
Community Center B2010 Coat or Paint, Prep & Fog Coat or 2027 Paint
Gomez Wall Finishes, any surface, Prep &
Community Center C2010 paint 2027
Gomez
Community Center C2030 Flooring, Vinyl Tile (VCT), Replace 2027 Gomez C2030 Flooring, Carpet, Commercial
Community Center Standard, Replace
2027
Gomez C2050 Ceiling Finishes, any flat surface, 2027
Community Center Prep & Paint
Gomez C2050 Ceiling Finishes, exposed irregular 2027
Community Center elements, Prep &Paint
Parque de Los
Ninos - Pool
Building
Parque de Los
Ninos - Pool
Building
B2010 Exterior Walls, Stucco 2027
C2010 Wall Finishes, any surface, Prep & 2027
Paint
Parque de Los Flooring, any surface, w/ Paint or
Ninos - Pool C2030 2027
Sealant, Prep & Paint
Building
Parque de Los Ceiling
Ninos - Pool C2050 elements, PrepFinishes, &Paintexposed irregular 2027 Building
Parque de Los
Ninos - Site
B2010 Exterior Walls, any painted
surface, Prep & Paint
2027
O Fair 10 3 $ 86,790 $ $ - $ - $ 94,838 $ - $ - $ $ - $ - $ O Fair 10 3 $ 39,744 $ - $ - $ - $ 43,429 $ - $ - $ - $ - $ - $ O Fair 3 $ 37,856 $ - $ - $ - $ 41,366 $ - $ - $ - $ - $ - $ O Fair 10 3 $ 4,800 $ - $ - $ - $ 5,245 $ - $ - $ - $ - $ - $ O Fair 3 $ 12,000 $ - $ - $ - $ 13,113 $ - $ - $ - $ - $ - $ O Fair 10 3 $ 4,320 $ - $ - $ - $ 4,721 $ - $ - $ - $ - $ - $ O Fair 3 $ 45,229 $ - $ - $ - $ 49,423 $ - $ - $ - $ - $ - $ O Fair 3 $ 8,960 $ - $ - $ - $ 9,791 $ - $ - $ - $ - $ - $ O Fair 3 $ 71,241 $ $ - $ - $ 77,847 $ - $ - $ - $ - $ - $ O Fair 3 $ 32,630 $ - $ - $ - $ 35,656 $ - $ - $ - $ - $ - $ O Fair 3 $ 21,520 $ - $ - $ - $ 23,515 $ - $ - $ - $ - $ - $ O Fair 3 $ 49,920 $ $ - $ - $ 54,549 $ - $ - $ - $ - $ - $ O Fair 3 $ 11,488 $ - $ - $ - $ 12,553 $ - $ - $ - $ - $ - $ O Fair 3 $ 16,720 $ - $ - $ - $ 18,270 $ - $ - $ - $ - $ - $ O Fair 10 3 $ 10,207 $ - $ - $ - $ 11,153 $ - $ - $ - $ - $ - $ O Fair 10 3 $ 4,560 $ - $ - $ - $ 4,983 $ - $ - $ - $ - $ - $ O Fair 10 3 $ 2,664 $ - $ - $ - $ 2,911 $ - $ - $ - $ - $ - $ O Fair 3 $ 4,440 $ - $ - $ - $ 4,852 $ - $ - $ - $ - $ - $ O Fair 3 $ 19,200 $ $ - $ - $ 20,980 $ - $ - $ - $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost
Score Useful Life
2024 2025 2026 2027 2028 2029 2030
2031 1 2032 ■ 2033
Parque del Arroyo G2050 Playfield Surfaces, Chips Wood, 6" 2027 Verde - Site Depth, Replace
Placentia Teen C1070 Suspended Ceilings, Acoustical
Center Tile (ACT), Replace
Placentia Teen
Center
Placentia Teen
Center
C2010
Wall Finishes, Acoustical Tile
(ACT), Fabric -Faced, Replace
2027
2027
C2030 Flooring, Vinyl Tile (VCT), Replace 2027
Placentia Teen C2030 Flooring, Carpet, Commercial 2027
Center Standard, Replace
Santa Fe Park B2010 Exterior Walls, any painted
surface, Prep & Paint
2027
Bradford Avenue G2020 Parking Lots, Pavement, Asphalt, 2027 Pedestrian Bridge Seal & Stripe
City Corporate
Yard Building
D4030 Fire Extinguisher, Wet
Chemical/CO2, Replace
Edwin T. Powell D4030 Fire Extinguisher, Wet
Building Chemical/CO2, Replace
Bradford Avenue
Pedestrian Bridge
Aguirre
Community Center
D7030
D7030
Champions Sports
Park - Snack D7030
Shack
City Corporate
Yard Building
City Hall (with
Police Station)
Fire Station 1
Fire Station 2
Backs Community
Center
Whitten
Community Center
D7030
D7030
D7030
D7030
D7030
D7030
Old City Hall D7030
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
2028
2028
2028 Operational lease costs (annual)
2028 Operational lease costs (annual)
2028 Operational lease costs (annual)
2028 Operational lease costs (annual)
2028 Operational lease costs (annual)
2028 Operational lease costs (annual)
2028 Operational lease costs (annual)
2028 Operational lease costs (annual)
2028 Operational lease costs (annual)
2028 Operational lease costs (annual)
O Excellent 10 3 $ 38,400 $ $ - $ $ 41,961 $ - $ - $ $ - $ - $ O Fair 3 $ 16,800 $ - $ - $ $ 18,358 $ - $ - $ $ - $ - $ O Fair 3 $ 22,400 $ - $ - $ $ 24,477 $ - $ - $ $ - $ - $ O Fair 3 $ 27,200 $ - $ - $ $ 29,722 $ - $ - $ - $ - $ - $ O Fair 3 $ 4,800 $ - $ - $ $ 5,245 $ - $ - $ - $ - $ - $ 0 Fair 3 $ 33,120 $ - $ - $ $ 36,191 $ - $ - $ - $ - $ - $ O Good 3 $ 38,880 $ - $ - $ $ 42,485 $ - $ - $ - $ - $ - $ O Fair 40 4 $ 4,800 $ - $ - $ - $ - $ 5,402 $ - $ - $ - $ - $ O Fair 40 4 $ 2,880 $ - $ - $ $ - $ 3,241 $ - $ $ - $ - $ NA 30 0 $ 12,000 $ $ - $ $ $ 13,506 $ - $ $ - $ - $
NA 30 0 $ 12,000 $ $ - $ $ $ 13,506 $ - $ $ - $ - $
NA 30 0 $ 12,000 $ $ - $ $ $ 13,506 $ - $ $ - $ - $
NA 30 0 $ 12,000 $ $ - $ $ $ 13,506 $ - $ $ - $ - $
NA 30 0 $ 12,000 $ $ - $ $ $ 13,506 $ - $ $ - $ - $
NA 30 0 $ 12,000 $ $ - $ $ $ 13,506 $ - $ $ - $ - $
NA 30 0 $ 12,000 $ $ - $ $ $ 13,506 $ - $ $ - $ - $
NA 30 0 $ 12,000 $ $ - $ $ $ 13,506 $ - $ $ - $ - $
NA 30 0 $ 12,000 $ $ - $ $ $ 13,506 $ - $ $ - $ - $
NA 30 0 $ 12,000 $ $ - $ $ $ 13,506 $ - $ $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost 2024 2025 2026 2027 2028 2029 I 2030 2031 Score Useful Life 1
2032 ■ 2033
Gomez D7030
Community Center
Placentia Teen
Center
D7030
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
2028 Operational lease costs (annual)
2028 Operational lease costs (annual)
Champions Sports Exterior Fixture w/ Lamp, any type,
Park - Snack G4050 2028
w/ LED Replacement, Replace
Shack
City Hall (with
Police Station)
Edwin T. Powell
Building
D3030 Split System Ductless, Single
Zone, Replace
Interior Lighting System, Full
D5040 Upgrade, Medium Density &
Standard Fixtures, Replace
2028
2028
Koch Park D2010 Water Heater, Electric, Instant Hot, 2028 Community Center Replace
Koch Park Exterior Site Lighting, Wall Pack,
Community Center G4050 any type w/ LED, 13 to 26 W, 2028 Replace
Backs Community D3030 Split System, Fan Coil Unit, DX, 1 2028 Units not accessible.
Center to 1 5 TON, Replace
Melrose Storm
Water Pump
Station
D2010 Pump, Circulation/Booster,
Domestic Water, Replace
2028
Gomez D3050 Packaged Unit, RTU, Pad or Roof- 2028
Community Center Mounted, Replace
Gomez D3050 Packaged Unit, RTU, Pad or Roof- 2028
Community Center Mounted, Replace
Gomez D5040 Emergency & Exit Lighting, Exit 2028
Community Center Sign, LED, Replace
Parque de Los
Ninos - Pool
Building
Interior Lighting System, Full
D5040 Upgrade, Medium Density &
Standard Fixtures, Replace
2028
Champions Sports D2010 Drinking Fountain, Exterior/Site, 2028 Park - Site Metal Pedestal, Replace
Champions Sports D2010 Drinking Fountain, Exterior/Site, 2028 Park - Site Metal Pedestal, Replace
Champions Sports Sink/Lavatory, Vanity Top,
Park - Snack D2010 Enameled Steel, Replace
Shack
2028
Champions Sports G2060 Picnic Table, Precast Concrete, 2028 Park - Site Replace
Park Bench, Metal Powder -Coated, 2028
Champions Sports G2060
Park - Site Replace
Champions Sports G2060 Park Bench, Precast Concrete, 2028 Park - Site Replace
NA 30 0 $ 12,000 $ $
NA 30 0 $ 12,000 $ $
O Fair 30 4 $ 7,680 $ - $
O Fair 30 4 $ 15,667 $ - $
O Fair 30 4 $ 68,141 $ $
O Fair 30 4 $ 1,600 $ $
O Fair 30 4 $ 6,400 $ $
Fair 30 4 $ 40,320 $ $
O Fair 30 4 $ 16,320 $ $
O Fair 30 4 $ 28,800 $ $
O Fair 30 4 $ 28,800 $ $
O Fair 30 4 $ 2,816 $ $
O Fair 30 4 $ 7,992 $ $
O Fair 25 4 $ 4,800 $ $
O Fair 25 4 $ 24,000 $ $
O Fair 25 4 $ 7,040 $ $
O Fair 20 4 $ 7,680 $ $
O Fair 20 4 $ 11,200 $ $
O Fair 20 4 $ 9,600 $ $
$ - $ $ 13,506 $ - $ - $
$ $ $ 13,506 $ - $ - $
8,644 5 - $ - $
$ $ - $ 17,633 5 - $ - $
$ $ - $ 76,693 $ - $ - $
- $ 1,801 $ - $ - $
- $ 7,203 $ - $ - $
- $ 45,381 $ - $ - $
- $ 18,368 $ - $ - $
- $ 32,415 $ - $ - $
- $ 32,415 $ - $ - $
- $ 3,169 $ - $ - $
- $ 8,995 $ - $ - $
- $ 5,402 $ - $ - $
$ -
$ _ $
$ 27,012 0 - $ - $ - $ - $
$ 7,924 5 - $ $ - $ - $
$ 8,644 5 - $ $ - $ - $
$ 12,606 3 - $ - $ - $ - $
$ 10,805 0 - $ $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Score Useful Life
Champions Sports G2060 Bike Rack, Fixed 1-5 Bikes,
Park - Site Replace
2028
Park Bench, Metal Powder -Coated, 2028
Champions Sports G2060
Park - Site Replace
City Corporate
Vard Building
City Corporate
Vard Building
Edwin T. Powell
Building
Parque de Los
Ninos - Pool
Building
B2020
Window, Aluminum Double -
Glazed, 16-25 SF, Replace
2028
C1030 Interior Door, Wood, Solid -Core, 2028
Replace
G2060 Trash Receptacle, Heavy -Duty
Fixed Concrete, Replace
F1050 Pool Equipment, Circulation
Pump, Replace
2028
2028
Edwin T. Powell E1030 Foodservice Equipment, Exhaust 2028 Building Hood, 8 to 10 LF, Replace
Edwin T. Powell
Building
Edwin T. Powell
Building
Foodservice Equipment,
E1030 Range/Oven, 6 -Burner w/ Griddle, 2028
Replace
Foodservice Equipment,
E1030 Refrigerator, 2 -Door Reach -In, 2028
Replace
Champions Sports Suspended Ceilings, Acoustical
Park - Snack C1070 Tile (ACT), Replace
Shack
2028
Champions Sports Wall Finishes, any surface, Prep &
Park - Snack C2010 point 2028
Shack
Champions Sports Ceiling Finishes, exposed irregular
Park - Snack C2050 elements, Prep & Paint 2028
Shack
City Corporate
Vard Building
City Corporate
Yard Building
02010 Exterior Walls, any painted
surface, Prep &Paint
2028
C2030 Flooring, Ceramic Tile, Replace 2028
Edwin T. Powell C2030 Flooring, any surface, w/ Paint or 2028 Building Sealant, Prep & Paint
Edwin T. Powell
Building
Fire Station 1
Fire Station 2
C2030 Flooring, Carpet, Commercial
Standard, Replace
02010 Exterior Walls, any painted
surface, Prep & Paint
62010 Exterior Walls, any painted
surface, Prep & Paint
Fire Station 2 C2050 Ceiling Finishes, any Oat surface, 2028 Prep & Paint
2028
2028
2028
O Fair 20 4 $ 3,840 $ - $
O Fair 20 4 $ 22,400 $ - $
O Fair 20 4 $ 27,360 $ - $
O Fair 20 4 $ 26,880 $ $
O Fair 20 4 $ 4,480 $ - $
O Fair 20 4 $ 43,520 $ $
O Fair 4 $ 14,400 $ $
O Fair 4 $ 32,640 $ $
O Fair 4 $ 14,720 $ $
O Fair 4 $ 8,960 $ - $
0 Fair 4 $ 10,320 $ $
O Fair 4 $ 10,480 $ $
O Fair 4 $ 158,400 $ $
O Fair 4 $ 28,800 $ $
O Fair 10 4 $ 2,928 $ - $
O Fair 4 $ 21,600 $ $
O Fair 4 $ 49,920 $ $
O Fair 4 $ 36,480 $ - $
O Fair 10 4 $ 26,880 $ $
$ - $ - $ 4,322 $ - $ $
$ - $ - $ 25,211 $ - $ - $
$ - $ - $ 30,794 $ - $ - $
$ - $ - $ 30,254 $ - $ - $
$ - $ - $ 5,042 $ - $ $
$ 48,982 $ - $ - $
$ 16,207 $ - $ - $
- $ 36,737 $ - $ - $
$ 16,567 $ - $ - $
$ 10,085 $ - $ - $
- $ 11,615 $ - $ - $
$ 11,795 $ - $ - $
- $ 178,281 $ - $ - $
- $ 32,415 $ - $ - $
$ - $ - $ 3,295 $ - $ - $
$ - $
$ 24,311 $ - $ - $
- $ 56,165 $ - $ - $
$ 41,059 $ - $ - $
- $ 30,254 $ - $ - $
$ -
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Score Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 MelroseExterior Walls, any painted
Water Pump
82010 surface, Prep &Paint 2028 0 Fair 10 4 $ 6,720 $ - $ - $ - $ - $ 7,563 $ - $ $ - $ - $ Station
Placentia Teen C2010 Wall Finishes, any surface, Prep & 2028 Center Paint 0 Fair 10 4 $ 19,680 $ $ - $ - $ - $ 22,150 $ - $ - $ - $ - $ Parque del Arroyo 62020 Parking Lots, Pavement, Asphalt, 2028 0 Good 5 4 $ 15,840 $ - $ - $ - $ - $ 17,828 $ - $ - $ - $ - $ Verde - 59e Seal &Stripe
Bradford Avenue B2010 Exterior Walls, any painted 2028 0 Good 3 4 $ 32,640 $ $ - $ - $ - $ 36,737 $ - $ - $ - $ - $ Pedestrian Bridge surface, Prep & Paint
City Corporate 52020 Parking Lots, Pavement, Asphalt, 2029 The site pavement is in poor condition and the plan is to repave the entire poor 50 0 $ 46,080 $ $ - $ - $ - $ - $ 53,419 $ - $ - $ - $ Yard - Site Seal & Stripe lot as part of the Public Safety Building Project.
Placentia Teen Parking Lots, Pavement, Asphalt, The pavement is missing striping for parking spaces and ADA pavement Center G2020 Seal &Stripe 2029 markings. Poor 50 0 E 5,040 $ $ - $ - $ - $ - $ 5,843 $ - $ - $ - $ Wagner Park G2050 Playfield Surfaces, Chips Wood, 3" 2029 0 Fair 40 2 $ 15640 $ $ - $ - $ - $ - $ 19,290 $ - $ - $ - $ Depth, Replace
City Corporate D7050 Fire Alarm Panel, Multiplex, 2029 0 Fair 40 5 $ 12,800 $ $ - $ $ - $ - $ 14,839 $ - $ - $ - $ Yard Building Replace
Edwin T. Powell Fire Alarm System, Full System
Building D7050 Upgrade, Simple Addressable, 2029 0 Fair 40 5 $ 35285 $ $ - $ $ - $ - $ 35,109 $ - $ - $ - $ Install
Goldenrod Park 62050 Replace Playfield Surfaces, Sand, 3" Depth, 2029 0 Fair 40 5 $ 15606 $ $ - $ $ - $ - $ 12,295 $ - $ - $ - $ Melrose Storm Fire Extinguisher, Wet
Water Pump D4030 Chemical/CO2, Replace 2029 0 Fair 40 5 $ 960 $ $ - $ $ - $ - $ 1,113 $ - $ - $ - $ Station
Gomez D4030 Fire Extinguisher, Wet 2029 0 Fair 40 5 $ 1,920 $ $ - $ $ - $ - $ 2,226 $ - $ - $ - $ Community Center Chemical/CO2, Replace
Parque de Los 52050 Replace Playfield Surfaces, Sand, 6" Depth, Vaqueros - Site 2029 0 Fair 40 5 $ 26,470 $ $ - $ - $ - $ - $ 30,686 $ - $ - $ - $ Richard Samp 52050 Replace Play Structure, Swing Set, 4 Seats, Park 2029 0 Fair 40 5 $ 8,000 $ $ - $ - $ - $ - $ 9,274 $ - $ - $ - $ Backs Community Roof Appurtenances, Gutters &
Center B3020 Downspouts, Aluminum w/ 2029 0 Fair 35 5 $ 1,584 $ - $ - $ - $ - $ - $ 1,836 $ - $ - $ - $ Fittings, Replace
Placentia Avenue Reefing' Single -Ply Membrane,
Storm Water B3010 TPO/PVC, Replace 2029 Evidence of water pooling. Drainage inadequate Fair 35 5 $ 41,344 $ $ - $ - $ - $ - $ 47,929 $ - $ - $ - $ Pump Station
Security/Surveillance System,
Bradford Avenue D7030 Lease Costs for 2029 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ 13,911 $ - $ - $ - $ Pedestrian Bridge Security/Surveillance System,
Lease
Security/Surveillance System,
Aguirre D7030 Lease Costs for 2029 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ 13,911 $ - $ - $ - $ Community Center Security/Surveillance System,
Lease
Champions SportsSecurity/Surveillance System,
Park - Snack D7030 Lease Costs for 2029 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ 13,911 $ - $ - $ - $ Shack Security/Surveillance System,
Lease
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Score Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 ■ 2033
Security/Surveillance System,
City Corporate D7030 Lease Costs for 2029 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ 13,911 $ - $ - $ - $ Yard Building Security/Surveillance System,
Lease
Security/Surveillance System,
City Hall (with D7030 Lease Costs for 2029 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ 13,911 $ - $ - $ - $ Police Station) Security/Surveillance System,
Lease
Security/Surveillance System,
Fire Station 1 D7030 Lease Costs for 2029 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ 13,911 $ - $ - $ - $ Security/Surveillance System,
Lease
Security/Surveillance System,
Fire Station 2 D7030 Lease Costs for 2029 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ 13,911 $ - $ - $ - $ Security/Surveillance System,
Lease
Security/Surveillance System,
Backs Community D7030 Lease Costs for 2029 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ 13,911 $ - $ - $ - $ Center Security/Surveillance System,
Lease
Security/Surveillance System,
Whitten D7030 Lease Costs for 2029 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ 13,911 $ - $ - $ - $ Community Center Security/Surveillance System,
Lease
Security/Surveillance System,
Old City Hall D7030 Lease Costs for 2029 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ 13,911 $ - $ - $ - $ Security/Surveillance System,
Lease
Security/Surveillance System,
Gomez D7030 Lease Costs for 2029 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ - $ $ - $ - $ 13,911 $ - $ - $ - $ Community Center Security/Surveillance System,
Lease
Security/Surveillance System,
Placentia Teen D7030 Lease Costs for 2029 Operational lease costs (annual) NA 30 0 $ 12,000 $ $ - $ $ - $ - $ 13,911 $ - $ - $ - $ Center Security/Surveillance System,
Lease
Aguirre G4050 Exterior Fixture w/ Lamp, any type, 2029 0 Fair 30 5 $ 7,680 $ $ - $ $ - $ - $ 8,903 $ - $ - $ - $ Community Center w/ LED Replacement, Replace
Champions Sports G4050 Floodlights, Floodlights, 90 W, 2029 0 Fair 30 5 $ 36,400 $ $ - $ $ - $ - $ 44,516 $ - $ - $ - $ Park - Site Replace/Install
Champions Sports G4050 Floodlights, Floodlights, 90 W, 2029 0 Fair 30 5 $ 36,400 $ $ - $ $ - $ - $ 44,516 $ - $ - $ - $ Park - Site Replace/Install
City Corporate D3020 Unit Heater, Natural Gas, Replace 2029 0 Fair 30 5 $ 13,120 $ $ - $ - $ - $ - $ 15,210 $ - $ - $ - $ Yard Building
City Corporate D3020 Unit Heater, Natural Gas, Replace 2029 0 Fair 30 5 $ 13,120 $ $ - $ - $ - $ - $ 15,210 $ - $ - $ - $ Yard Building
City Corporate D3020 Unit Heater, Natural Gas, Replace 2029 0 Fair 30 5 $ 13,120 $ $ - $ $ - $ - $ 15,210 $ - $ - $ - $ Yard Building
City Corporate D3020 Unit Heater, Natural Gas, Replace 2029 0 Fair 30 5 $ 13,120 $ $ - $ $ - $ - $ 15,210 $ - $ - $ - $ Yard Building
City Corporate D3020 Unit Heater, Natural Gas, Replace 2029 0 Fair 30 5 $ 13,120 $ $ - $ $ - $ - $ 15,210 $ - $ - $ - $ Yard Building
City Corporate D3060 Exhaust Fan, Centrifugal, 16" 2029 0 Fair 30 5 $ 7,680 $ $ - $ $ - $ - $ 6,903 $ - $ - $ - $ Yard Building Damper, Replace
City Hall (with D2010 Pump, Circulation/Booster, 2029 0 Fair 30 5 $ 19,520 $ $ - $ $ - $ - $ 22,629 $ - $ - $ - $ Police Station) Domestic Water, Replace
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Score Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
Edwin T. Powell
Building
D2010 Pump, Circulation/Booster,
Domestic Water, Replace
2029
D3050 Pump, sUtioVlled 2029
or CondenDiseibur Watern,HReACplaChice
D5010 Generator, Diesel, Replace 2029
D5010 Automatic Transfer Switch, ATS, 2029
Replace
Exterior Fixture w/ Lamp, any type,
G4050 w/ LED Replacement, 250 W, 2029
Replace
Fire Station 2 D3030 Split System Ductless, Single
Zone, Replace
2029
Koch Park D2010 Water Heater, Electric, Residential, 2029 Community Center Replace
Kraemer Storm Split System Ductless, Single
Water Pump D3030 Zone, Replace
Station
2029
McFadden Park - Storage Tank, Chemical, Interior,
Pool Equipment D3010 Replace 2029
Building
Whitten Exhaust Fan, Centrifugal, 12"
Community Center D3060 Damper, 100 to 1000 CFM, 2029
Replace
Whitten D3060 Exhaust Fan, Centrifugal, 16"
Community Center Damper, Replace
2029
Whitten Exhaust Fan, Centrifugal, 12"
Community Center D3060 Damper, 100 to 1000 CFM, 2029
Replace
Whitten D3060 Exhaust Fan, Centrifugal, 16"
Community Center Damper, Replace
Whitten D3060 Exhaust Fan, Centrifugal, 16"
Community Center Damper, Replace
2029
2029
Old City Hall D2010 Water Heater, Electric, Residential, 2029 Replace
Parque de Los Plumbing System, Supply &
Ninos - Pool D2010 Sanitary, Medium Density
Building (excludes fixtures), Replace
Parque de Los
Vaqueros - Site
2029
Pole Light Fixture w/ Lamps, any
G4050 type 30' High, w/ LED 2029
Replacement, Replace/Install
Parque del Arroyo Plumbing System, Supply &
Verde - Restroom D2010 Sanitary, Low Density (excludes 2029 Building fixtures), Replace
Parque del Arroyo Electncal System, Wiring &
Verde - Restroom D5030 Switches, Average or Low
Building Density/Complexity, Replace
2029
O Fair 30 5 $ 19,520 $ $ - $ - $ - $ - $ 22,629 $ - $ - $ - $ O Fair 30 5 $ 19,910 $ $ - $ $ - $ - $ 23,081 $ - $ - $ - $ O Fair 30 5 $ 275,200 $ $ - $ $ - $ - $ 319,032 $ - $ - $ - $ O Fair 30 5 $ 27,200 $ $ - $ $ - $ - $ 31,532 $ - $ - $ - $ O Fair 30 5 0 3,840 $ $ - $ $ - $ - $ 4,452 $ $ - $ - $ O Fair 30 5 $ 15,360 $ $ - $ $ - $ - $ 17,806 $ - $ - $ - $ O Fair 30 5 $ 1,760 $ $ - $ $ - $ - $ 2,040 $ - $ - $ - $ O Fair 30 5 $ 11,200 $ $ - $ $ - $ - $ 12,984 $ - $ - $ - $ O Fair 30 5 $ 8,320 $ $ - $ $ - $ - $ 9,645 $ - $ - $ - $ O Fair 30 5 $ 4,480 $ $ - $ $ - $ - $ 5,194 $ - $ - $ - $ O Fair 30 5 $ 7,680 $ $ - $ $ - $ - $ 8,903 $ - $ - $ - $ O Fair 30 5 $ 4,480 $ $ - $ $ - $ - $ 5,194 $ - $ - $ - $ O Fair 30 5 $ 7,680 $ $ - $ - $ - $ - $ 8,903 $ - $ - $ - $ O Fair 30 5 $ 7,680 $ $ - $ $ - $ - $ 8,903 $ - $ - $ - $ O Fair 30 5 $ 2,880 $ $ - $ $ - $ - $ 3,339 $ - $ - $ - $ O Fair 30 5 $ 19,536 $ $ - $ $ - $ - $ 22,648 $ - $ - $ - $ O Fair 30 5 $ 21,760 $ $ - $ $ - $ - $ 25,226 $ - $ - $ - $ O Fair 30 5 $ 7,600 $ $ - $ $ - $ - $ 8,610 $ - $ - $ - $ O Fair 30 5 $ 3,800 $ $ - $ $ - $ - $ 4,405 $ - $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating PScore Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 al. 2032 2033 Placentia Avenue rfor
Storm Water D5020 SlepdoSecondwnary , RepTanslace mer, Dry, Pump Station
Placentia Teen
Center
Plumbing System, Supply &
D2010 Sanitary, Medium Density
(excludes fixtures), Replace
Tof ree Park - Site D2010 Backflow Preventer, Domestic
Water, Replace
Aguirre D2010 Sink/Lavatory, Vanity Top,
Community Center Enameled Steel, Replace
City Corporate
Vard Building
Goldenrod Park
2029
2029
2029
2029
D2010 Sink/Lavatory, Service Sink, Wall- 2029
Hung, Replace
D2010 Drinking Fountain, Exterior/Site,
Metal Pedestal, Replace
2029
Kraemer Memorial Drinking Fountain, Wall -Mounted,
Park - Restroom D2010 Bi -Level, rr Replace 2029
Building
Parque de Los
Ninos - Pool
Building
Parque de Los
Ninos - Pool
Building
Parque de Los
Ninos - Pool
Building
Parque de Los
Ninos - Pool
Building
D2010 Toilet, Residential Water Closet, 2029
Replace
D2010 Shower, Ceramic Tile, Replace 2029
D2010 Urinal, Standard, Replace 2029
D2010 Drinking Fountain, Exterior/Site,
Metal Pedestal, Replace
Parque de Los
Vaqueros - D2010 Urinal, Standard, Replace
Restroom Building
Parque de Los Sink/Lavatory, Wall -Hung,
Vaqueros
os - D2010 Vitreous China, Replace
Restroom Building
2029
2029
2029
Parque de Los Toilet, Commercial Water Closet,
Vaqueros- D2010 Replace 2029
Restroom Building
Tynes Gym
Bradford Park
D2010 Toilet, Commercial Water Closet, 2029
Replace
Irrigation System, Controllers &
G2080 Valves, Repairs & Adjustments,
Repair
2029
Champions Sports G2050 Sports Apparatus, Player/Dugout 2029 Park - Site Benches, 12' Length, Replace
City Corporate F1020 Ancillary Building, Wood -Framed 2029 Vard - Site or CMU, Basic/Minimal, Replace
City Corporate F1020 Ancillary Building, Wood -Framed 2029 Vard - Site or CMU, Basic/Minimal, Replace
O Fair 30
O Fair 30
O Fair 30
O Fair 25
O Fair 25
O Fair 25
O Fair 25
O Fair 25
O Fair 25
O Fair 25
O Fair 25
O Fair 25
O Fair 25
O Fair 25
O Fair 25
O Fair 20
O Fair 20
O Fair 20
O Fair 20
5 $ 64,000 $ $
5 $ 68,534 $ $
5 $ 4,480 $ $
5 $ 3,520 $ $
5 $ 4,480 $ $
5 $ 4,800 $ - $
5 $ 4,800 $ $
5 $ 6,720 $ $
5 $ 16,000 $ $
5 $ 3,520 $ $
5 $ 4,600 $ $
5 $ 3,520 $ - $
5 $ 9,600 $ - $
5 $ 12,480 $ $
5 $ 20,800 $ $
5 $ 96,000 $ $
5 $ 8,640 $ $
5 $ 115,200 $ $
5 $ 230,400 $ $
$ $
$ - $
$ $
$ - $ 74,194 $ - $
$ - $ 79,450 $ - $
$ - $ 5,194 $ - $
$ - $ 4,081 $ - $
$ - $ 5,194 $ - $
$ - $ 5,565 $ - $
$ - $ 5,565 $ - $
$ - $ 7,790 $ - $
$ - $ 18,548 $ - $
$ - $ 4,081 $ - $
$ - $ 5,565 $ - $
$ - $ 4,081 $ - $
$ - $ 11,129 $ - $
$ - $ 14,468 $ - $
$ - $ 24,113 $ - $
$ - $ 111,290 $ - $
$ - $ 10,016 $ - $
$ - $ 133,548 $ - $
$ - $ 267,097 $ - $
$ -
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost
Score Useful Life
2024 2025 2026 2027 2028 2029 2030 2031 al. 2032 2033
City Hall (with F1050 Pool Equipment, Circulation 2029 0 Fair 20 5 $ 16,320 $ $ - $ - $ - $ Police Station) Pump, Replace
Goldenrod Park G2050 Campground Accessories, Grill, 2029 0 Fair 20 5 $ 3,840 $ - $ - $ - $ - $ Pedestal -Style, Replace
Goldenrod Park 02080 Landscaping, Mature Trees, 2029 0 Fair 20 5 $ 62,400 $ $ - $ - $ - $ Removal/Trimming, Repair
Koch Park Screens & Shutters, Rolling
Community Center B2020 Security Shutter, 10 to 50 SF, 2029 0 Fair 20 5 $ 15,360 $ $ - $ - $ - $ Replace
Koch Park C1090 Toilet Partitions, Plastic/Laminate, 2029 0 Fair 20 5 $ 9,600 $ - $ - $ - $ - $ Community Center Replace
Kraemer Memorial Athletic Surfaces & Courts,
Kaye -erte G2050 Basketball, 2 -Color Surface, Seal 2029 0 Fair 20 5 $ 21,600 $ $ - $ - $ - $ & Stripe
Kraemer Storm Fire Alarm Panel, Mulfiplex,
Water Pump D7050 Replace 2029 0 Good 20 5 $ 12,800 $ $ - $ - $ - $ Station
McFadden Park - pool Equipment, CirculationPool Equipment F1050 pump, Replace 2029 0 Fair 20 5 $ 19,520 $ $ - $ $ - $ Building
McFadden Park - Pool Equipment, Filtration System,
Pool Equipment F1050 Replace 2029 0 Fair 20 5 $ 19,200 $ $ - $ $ - $ Building
McFadden Park- F1050 Pool Accessories, Underwater 2029 0 Fair 20 5 $ 7,680 $ $ - $ $ - $ Site Lighting, Replace
McFadden Park- Athletic Surfaces & Courts,
Site G2050 Basketball/General, Asphalt 2029 0 Fair 20 5 $ 95,200 $ $ - $ $ - $ Pavement, Mill & Overlay
Whitten
B2050 Exterior Door, Steel, Standard, 2029 0 Fair 20 5 $ 30,720 $ $ - $ $ - $ Community Center Replace
Whitten C1010 Interior Wall, Movable Partitions, 2029 0 Fair 20 5 $ 2,822 $ $ - $ $ - $ Community Center Fabric 8 to 10' Height, Replace
Old City Hall G2060 Decorative Fountains, Aerator or 2029 0 Fair 20 5 $ 6,400 $ $ - $ $ - $ Nozzle, Replace
Gomel B2050 Exterior Door, Steel, Standard, 2029 0 Fair 20 5 $ 7,680 $ $ - $ $ - $ Community Center Replace
Gomez C1030 Interior Door, Wood, Solid -Core, 2029 0 Fair 20 5 $ 13,440 $ $ - $ $ - $ Community Center Replace
Parque de Los Exterior Door, Wood, Solid -Core,
Ninos - Pool B2050 Replace 2029 0 Fair 20 5 $ 2,240 $
Building
Perque de Los F1050 Pool Finishes, Basin & Deck 2029 0 Fair 20 5 $ 56,742 $ Ninos - Site Finishes, Plaster Basin, Refinish
Perque de Los G2050 Campground Accessories, Grill, 2029 0 Fair 20 5 $ 1,920 $ Ninos - Site Pedestal -Style, Replace
- $ 18,919 $ - $ - $ - $
$ 4,452 $ - $ - $ - $
$ 72,339 $ - $ - $ - $
$ 17,806 $ - $ - $ - $
$ 11,129 $ - $ - $ - $
$ 25,040 $ - $ - $ - $
$ 14,839 $ - $ - $ - $
$ 22,629 $ - $ - $ - $
$ 22,258 $ - $ - $ - $
$ 8,903 $ - $ - $ - $
- $ 110,363 $ - $ - $ - $
- $ 35,613 $ - $ - $ - $
$ 3,271 $ - $ - $ - $
$ 7,419 $ - $ - $ - $
$ 8,903 $ - $ - $ - $
$ 15,581 $ - $ - $ - $
$ 2,597 $ - $ - $ - $
- $ 65,780 $ - $ - $ - $
$ 2,226 $ - $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating score Useful Life Current Cost 2024 2025 2026 2027 2028 2029 iority Remaining 2030 2031 2032 2033
al.
Parque de Los
Ninos - Site
Parque de Los
Vaqueros - Site
Parque de Los
Vaqueros - Site
Parque de Los
Vaqueros - Site
G2060 Fences & Gates, Fence, any
Painted Surface, Prep & Paint
2029
F1020 Gazebo, Wood Framed, Standard, 2029
Replace
G2060 Trash Receptacle, Medium -Duty 2029
Metal or Precast, Replace
G2080 Landscaping, Mature Trees,
Removal/Trimming, Repair
2029
Parque del Arroyo Fences & Gates, Pedestrian Gate,
Verde -Restroom G2060 Wrought Iron, Replace 2029
Building
Parque del Arroyo 52080 Irrigation System, Control Panel, 2029 Verde - Site Replace
Parque del Arroyo G2080 Landscaping, Mature Trees,
Verde - Site Removal/Trimming, Repair
Placentia Teen
Center
Placentia Teen
Center
Richard Samp
Park
B2050 Exterior Door, Steel, Standard,
Replace
2029
2029
Park Bench,
G2060 Wood/Composite/Fiberglass, 2029
Replace
G2050 Campground Accessories, Grill,
Pedestal -Style, Replace
2029
Outdoor Spectator Seating,
Tuffree Park - Site G2050 Bleachers, Aluminum Benches 2029 (per Seat), Replace
Tuffree Park - Site 52060 Fences & Gates, Fence, Chain
Link 8', Replace
Tuffree Park - Site G2060 Bike Rack, Fixed 1-5 Bikes,
Replace
2029
2029
Tuffree Park - Site 52080 Irrigation System, Control Panel, 2029 Replace
Tynes Gym
Tynes Gym
Wagner Park
Wagner Park
Exterior Door, Wood, Solid -Core,
B2050 Replace 2029
52060 Fences & Gates, Pedestrian Gate, 2029
Wrought Iron, Replace
Irrigation System, Controllers &
G2080 Valves, Repairs & Adjustments, 2029
Repair
52080 Irrigation System, Control Panel, 2029
Replace
Wagner Park G2080 Landscaping, Mature Trees,
Removal/Trimming, Repair
2029
O Fair 20 5 $ 38,400 $ - $ - $ - $ - $ - $ 44,516 $ - $ - $ - $ O Fair 20 5 $ 28,000 $ - $ - $ - $ - $ - $ 32,460 $ - $ - $ - $ O Fair 20 5 $ 6,720 $ - $ - $ - $ - $ - $ 7,790 $ - $ - $ - $ O Fair 20 5 $ 192,000 $ $ - $ - $ - $ - $ 222,581 $ - $ - $ - $ O Fair 20 5 $ 5,120 $ - $ - $ - $ - $ - $ 5,935 $ - $ - $ - $ O Fair 20 5 $ 16,000 $ - $ - $ - $ - $ - $ 18,548 $ - $ - $ - $ O Fair 20 5 $ 211,200 $ $ - $ - $ - $ - $ 244,839 $ - $ - $ - $ O Fair 20 5 $ 5,760 $ $ - $ $ - $ - $ 6,677 $ - $ - $ - $ O Fair 20 5 $ 5,760 $ $ - $ $ - $ - $ 6,677 $ - $ - $ - $ O Fair 20 5 $ 5,760 $ $ - $ $ - $ - $ 6,677 $ - $ - $ - $ O Fair 20 5 $ 38,400 $ $ - $ $ - $ - $ 44,516 $ - $ - $ - $ O Fair 20 5 $ 19,200 $ $ - $ $ - $ - $ 22,258 $ - $ - $ - $ O Fair 20 5 $ 1,920 $ $ - $ $ $ - $ 2,226 $ - $ - $ - $ O Fair 20 5 $ 16,000 $ $ - $ $ $ - $ 18,548 $ $ - $ - $ O Fair 20 5 $ 4,480 $ $ - $ $ $ - $ 5,194 $ $ - $ - $
O Fair 20 5 $ 5,120 $ $ - $ $ $ - $ 5,935 $ $ - $ - $
O Fair 20 5 $ 134,400 $ $ - $ $ $ - $ 155,806 $ $ - $ - $ O Fair 20 5 $ 16,000 $ $ - $ $ $ - $ 18,548 $ $ - $ - $ O Fair 20 5 $ 192,000 $ $ - $ $ $ - $ 222,581 $ $ - $ - $
Building
Uniform at
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost
Score Useful Life
2024 2025 2026 2027 2028 2029 2030 2031 al. 2032 2033
Champions Sports Foodservice Equipment, Griddle,
Park - Snack E1030 Replace 2029
Shack
City Corporate
Vard Building
E1030 Foodservice Equipment, Icemaker, 2029
Freestanding, Replace
Koch Park E1030 Foodservice Equipment, Garbage 2029
Community Center Disposal, 1 to 3 HP, Replace
City Corporate
Vard Building
City Corporate
Vard Building
City Corporate
Yard Building
City Corporate
Yard Building
City Corporate
Yard Building
City Corporate
Yard Building
City Corporate
Yard - Open
Garage
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
C2010 Wall Finishes, Ceramic Tile,
Replace
2029
C2010 Wall Finishes, any surface, Prep & 2029
Paint
C2030 Flooring, any surface, w/ Paint or 2029
Sealant, Prep & Paint
C2030 Flooring, any surface, w/ Paint or 2029
Sealant, Prep & Paint
C2050 Ceiling Finishes, any Oat surface, 2029
Prep &Paint
C2050 Ceiling Finishes, exposed irregular 2029
elements, Prep &Paint
B2010 Exterior Walls, Metal Siding,
Replace
02010 Exterior Walls, any painted
surtace, Prep & Paint
2029
2029
C2010 Wall Finishes, any surface, Prep & 2029
Paint
C2030 Flooring, Carpet, Commercial
Standard, Replace
2029
C2030 Flooring, Carpet, Commercial Tile, 2029
Replace
C2050 Ceiling Finishes, any Oat surface, 2029
Prep & Paint
Fire Station 1 C2010 Wall Finishes, any surface, Prep & 2029 Paint
Fire Station 1
C2030 Flooring, any surface, w/ Epoxy
Coating, Prep & Paint
2029
Fire Station 1 C2030 Flooring, Carpet, Commercial Tile, 2029 Replace
Fire Station 1 C2050 Ceiling Finishes, any Oat surface, 2029 Prep &Paint
O Fair
O Fair
O Fair
O Fair
O Fair
O Fair
O Fair
O Fair
O Fair
O Fair
O Fair
O Fair
O Fair
O Fair
O Fair
O Fair
O Fair
O Fair
O Fair
5 $ 22,400 $ $
5 $ 21,440 $ $
5 $ 12,160 $ $
5 $ 48,960 $ $
5 $ 79,200 $ $
5 $ 5,568 $ - $
5 $ 21,432 $ $
5 § 15,840 $ $
5 $ 58,200 $ $
5 $ 125,312 $ $
5 $ 110,400 $ $
5 $ 218,400 $ $
5 $ 28,800 $ $
5 $ 135,200 $ $
5 $ 112,000 $ $
5 $ 23,040 $ $
5 $ 69,120 $ $
5 $ 14,560 $ $
5 $ 12,800 $ $
$
- $ 25,968 $ - $
$ 24,855 $ - $
$ 14,097 $ - $
- $ 56,758 $ - $
- $ 91,815 $ - $
$ 6,455 $ - $
$ 24,846 $ - $
$ 18,363 $ - $
- $ 67,470 $ - $
- $ 145,271 $ - $
- $ 127,984 $ - $
- $ 253,185 $ - $
- $ 33,387 $ - $
$ 156,734 $ $
$ 129,839 $ $
$ 26,710 $ $
$ 80,129 $ $
$ 16,879 $ $
$ 14,839 $ $
$ -
$ -
$ -
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Score Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Fire Station 2 C2010 Wall Finishes, any surface, Prep & Paint 2029 0 Fair 10 5 $ 35,520 $ $ - $ - $ - $ - $ 41,177 $ - $ - $ - $ Fire Station 2 C2030 Flooring, any surface, w/ Epoxy 2029 0 Fair 10 5 $ 96,000 $ $ - $ - $ - $ - $ 111,290 $ - $ - $ - $ Coating, Prep 8 Paint
Koch Park Exterior Walls, Stucco, Prep & Fog
Community Center B2010 Coat or Paint, Prep & Fog Coat or 2029 0 Fair 5 $ 19,558 $ $ - $ - $ - $ - $ 22,673 $ - $ - $ - $ Paint
Koch Park C2030 Flooring, Carpet, Commercial 2029 0 Fair 5 $ 24,000 $ $ - $ - $ - $ - $ 27,823 $ - $ - $ - $ Community Center Standard, Replace
Koch Park E2010 Casework, Cabinetry, Hardwood 2029 0 Fair 5 $ 23,040 $ $ - $ - $ - $ - $ 26,710 $ - $ - $ - $ Community Center Standard, Replace
Backs Community 62010 Exterior Walls, any painted 2029 0 Fair 5 $ 129,600 $ $ - $ - $ - $ - $ 150,242 $ - $ - $ - $ Center surface, Prep & Paint
Kraemer Memorial io
Park - Restroom B2010 Exter
urtace,r PrepWalls, &Paintanypainted 2029 0 Fair 5 $ 8,880 $ - $ - $ - $ - $ - $ 10,294 $ - $ - $ - $ Building
Kraemer Memorial Wall Finishes, any surface, Prep &
Park -Restroom C2010 paint 2029 0 Fair 5 $ 4,320 $ - $ - $ $ $ - $ 5,008 $ - $ - $ - $ Building
McFadden Park -
Pool Equipment B2010 Exterior Walls, Stucco 2029 0 Fair 5 $ 15,891 $ $ - $ $ $ - $ 18,422 $ - $ - $ - $ Building
Whitten C2010 Wall Finishes, any surfac'e' Prep & 2029 0 Fair 5 $ 100,320 $ $ - $ $ $ - $ 116,298 $ - $ - $ - $ Community Center Paint
Whitten
Community Center C2030 Flooring, Vinyl Tile (VCT), Replace 2029 0 Fair 10 5 $ 67,200 $ $ - $ $ $ - $ 77,903 $ - $ - $ - $ Whitten C2050 Ceiling Finishes, any Oat surtace, 2029 0 Fair 10 5 $ 10,880 $ $ - $ $ - $ - $ 12,613 $ $ - $ - $ Community Center Prep & Paint
Whitten E2010 Casework, Cabinetry, Hardwood 20290 Fair 10 5 $ 115,200 $ $ - $ - $ - $ - $ 133,548 $ $ - $ - $ Community Center Standard, Replace
Placentia Teen C2050 Ceiling Finishes, exposed irregular 2029 0 Fair 10 5 $ 1,600 $ - $ - $ - $ - $ - $ t,855 $ $ - $ - $ Center elements, Prep &Paint
Tynes Gym C2030 Flooring, Vinyl Sheeting, Replace 2029 0 Fair 10 5 $ 201,600 $ $ - $ - $ - $ - $ 233,710 $ - $ - $ - $ Bradford Park G2080 Landscaping, Mature Trees, 2029 0 Good 5 $ 192,000 $ $ - $ $ - $ - $ 222,581 $ - $ - $ - $ Removal(Trimming, Repair
Kraemer Storm Pump Station, Sanitary Pump
Water Pump G2080 Station Pump Control Panel, 2029 0 Good 5 $ 17,600 $ $ - $ $ - $ - $ 20,403 $ - $ - $ - $ Station Replace
Gomez G2020 Parking Lots, Pavement, Asphalt, 2029 0 Good 5 $ 12,276 $ $ - $ $ - $ - $ 14,231 $ - $ - $ - $ Community Center Seal stripe
Kraemer Memorial Parking Lots, Pavement, Asphalt, It was scheduled to be performed within a few days after the assessment Park - Site 52020 Seal &Stripe 2029 visit. Excellent 3 5 $ 42,460 $ $ - $ $ - $ - $ 49,246 $ - $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Score Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Kraemer Storm
Water Pump
Station
C2010 Wall Finishes, any surface, Prep & 2029
Paint
Kraemer Stonn Flooring, any surface, w/ Paint or
Water Pump C2030 2029
Sealant, Prep & Paint
Station
Kraemer Storm Ceiling Finishes, any flat surface,
Water Pump C2050 2029
Prep & Paint
Station
Bradford Avenue D7050 Fire Alarm System, Full System
Pedestrian Bridge Upgrade, Basic/Zoned, Install
Bradford Avenue
Pedestrian Bridge
Aguirre
Community Center
D7030
D7030
Champions Sports
Park - Snack D7030
Shack
City Corporate
Yard Building
City Hall (with
Police Station)
Fire Station 1
Fire Station 2
Backs Community
Center
Whitten
Community Center
D7030
D7030
D7030
D7030
D7030
D7030
Old City Hall D7030
Gomez
Community Center
Placentia Teen
Center
D7030
D7030
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Bradford Avenue D1010 Elevator Controls, Automatic, 1
Pedestrian Bridge Car, Replace
Bradford Avenue D3060 Exhaust Fan, Roof or Wall -
Pedestrian Bridge Mounted, 10" Damper, Replace
Bradford Avenue D3060 Exhaust Fan, Roof or Wall -
Pedestrian Bridge Mounted, 10" Damper, Replace
2030
2030 Operational lease costs (annual)
2030 Operational lease costs (annual)
2030 Operational lease costs (annual)
2030 Operational lease costs (annual)
2030 Operational lease costs (annual)
2030 Operational lease costs (annual)
2030 Operational lease costs (annual)
2030 Operational lease costs (annual)
2030 Operational lease costs (annual)
2030 Operational lease costs (annual)
2030 Operational lease costs (annual)
2030 Operational lease costs (annual)
2030
2030
2030
O Good 3 5 $ 3,840 $ - $ - $ - $ - $ - $ 4,452 $ $ - $ - $ O Good 3 5 $ 1,920 $ - $ - $ - $ - $ - $ 2,226 $ $ - $ - $ O Good 3 5 $ 2,560 $ - $ - $ - $ - $ - $ 2,968 $ - $ - $ - $ O Fair 40 6 $ 21,120 $ $ - $ - $ - $ - $ - $ 25,218 $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ 14,329 $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ 14,329 $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ 14,329 $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ 14,329 $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ 14,329 $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ 14,329 $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ 14,329 $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ 14,329 $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ 14,329 $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ 14,329 $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ 14,329 $ - $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ 14,329 $ - $ - $ O Fair 30 6 $ 16,000 $ $ - $ $ - $ - $ - $ 19,105 $ - $ - $ O Fair 30 6 $ 3,840 $ $ - $ $ - $ - $ - $ 4,585 $ - $ - $ O Fair 30 6 $ 3,840 $$ - $ - $ - $ - $ - $ 4,585 $ - $ - $
Building
Uniformat
Cade
Cost Description
Project
Year
Comments
Rating PScore Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 al. 2032 2033 Bradford Avenue Lighting Controls, Dimming Panel,
Pedestrian Bridge D5040 Digital Time Control Clock & 2030 Photosensor, Replace
Bradford Avenue Interior Lighting System, Full
Pedestrian Bridge D5040 Upgrade, Medium Density &
Standard Fixtures, Replace
Bradford Avenue Interior Lighting System, Full
Pedestrian Bridge D5040 Upgrade, Medium Density &
Standard Fixtures, Replace
City Corporate
Yard Building
City Hall (with
Police Station)
Interior Lighting System, Full
D5040 Upgrade, Medium Density &
Standard Fixtures, Replace
D3060
Exhaust Fan, Roof or Wall -
Mounted, 12" Damper, Replace
2030
2030
2030
2030
Whitten 02010 Water Heater, Electric, Residential, 2030 Community Center Replace
Whitten Interior Lighting System, Full
Community Center D5040 Upgrade, Medium Density &
Standard Fixtures, Replace
Melrose Storm
Water Pump
Station
Melrose Storm
Water Pump
Station
Melrose Storm
Water Pump
Station
D2030 Pump, Sump, 20 HP, Replace
Exhaust Fan, Centrifugal, 12"
D3060 Damper, 100 to 1000 CFM,
Replace
Exhaust Fan, Centrifugal, 12"
D3060 Damper, 100 to 1000 CFM,
Replace
2030
2030 Quantity and capacity assumed.
2030
2030
Placentia Avenue Circulation Pump, AHU or Pump,
Stone Water D5030 Replaoe 2030
Pump Station
Placentia Avenue Circulation Pump, AHU or Pump,
Stone Water D5030 Replace 2030
Pump Station
Placentia Teen
Center
Electnoal System, Wiring &
D5030 Switches, Average Complexity, 2030
Replace
Whitten 02010 Drinking Fountain, Wall -Mounted, 2030
Community Center Single -Level, Replace
Bradford Avenue G2060 Trash Receptacle, Medium -Duty 2030 Pedestrian Bridge Metal or Precast, Replace
Bradford Avenue G2080 Irrigation System, Pop -Up Spray 2030 Pedestrian Bridge Heads, Commercial, Replace
Champions Sports F1020 Ancillary Building, Wood -Framed 2030 Park - Site or CMU, Basic/Minimal, Replace
Koch Park - Site G2080 Irrigation System, Control Panel, 2030 Replace
Trash Receptacle, Portable/Light-
Kraemer Memorial G2060 2030
Park - Site Duty, Replace
O Fair 30
O Fair 30
O Fair 30
O Fair 30
O Fair 30
O Fair 30
O Fair 30
Fair 30
O Fair 30
O Fair 30
O Fair 30
O Fair 30
O Fair 30
O Fair 25
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
6 $ 14,976 $ $ - $
6 $ 63,360 $ $ - $
6 $ 14,400 $ $ - $
6 $ 158,400 $ $ - $
6 $ 4,570 $ - $ - $
6 $ 2,080 $ - $ - $
6 $ 133,603 $ $ - $
6 $ 42,880 $ $ - $
6 $ 4,480 $ - $ - $
6 5 4,480 $
6 $ 70,400 $
6 $ 70,400 $
6 $ 15,576 $
6 5 7,680 $
6 5 4,480 $
6 $ 80,000 $
6 $ 13,440 $
6 $ 16,000 $
6 5 3,840 $
$ _ $ _ $
- $ 17,882 $ - $ - $
- $ 75,655 $ - $ - $
- $ 17,194 $ - $ - $
- $ 189,138 $ - $ - $
$ 5,457 $ - $ - $
$ 2,484 $ - $ - $
- $ 159,529 $ - $ - $
- $ 51,201 $ - $ - $
$ 5,349 $ - $ - $
$ 5,349 $ - $ - $
$ - $ - $ - $ 84,061 $
$ - $ - $ - $ 84,061 $
$ - $ - $ - $ 18,599 $
$ - $ - $ - $ 9,170 $
$ - $ - $ - $ 5,349 $
$ -
$ 95,524 $ - $ - $
$ 16,048 $ - $ - $
$ 19,105 $ - $ - $
$ 4,585 $ - $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Score Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Kraemer Memorial G2080 Irrigation System, Control Panel, 2030 Park - Site Replace
McFadden Park- B2050 Exterior Door, Wire Mesh Metal, 2030 Restroom Building Gate, Replace
McFadden Park- F1050 Pool Finishes, Basin 8 Deck 2030
Site Finishes, Plaster Basin, Refinish
Parque de Los Pool Equipment, Supplemental
Ninos - Pool F1050 Components, Chemical Controller, 2030 Building Install
Parque de Los
Ninos - Pool
Building
Pool Equipment, Filtration System,
F1050 Replace 2030
- ns Sports
Park Foodservice Equipment, Griddle,
Parknack E1030 Replace 2030
Shack
Koch Park E1030 Foodservice Equipment, Freezer, 1 2030
Community Center Door Reach -In, Replace
Koch Park E1030 Foodservice Equipment, Fountain 2030
Community Center Dispenser, Fountain Dispenser
Koch Park Foodservice Equipment,
Community Center E1030 Refrigerator, 1 -Door Reach -In, 2030 Replace
Whitten E1030 Foodservice Equipment, Freezer, 3 2030
Community Center Door Reach -In, Replace
Parque del Arroyo G2050 Playfield Surfaces, Chips Wood, 6" 2030 Verde - Site Depth, Replace
Bradford Avenue G4050 Exterior Fixture w/ Lamp, any type, 2030 Pedestrian Bridge w/ LED Replacement, Replace
Bradford Avenue G4050 Exterior Fixture w/ Lamp, any type, 2030 Pedestrian Bridge w/ LED Replacement, Replace
Edwin T. Powell D2010 Water Heater, Gas, Tankless, 2030 Building Replace
Fire Station 2 C2030 Flooring, Carpet, Commercial Tile, 2030 Replace
Backs Community C2050 Ceiling Finishes, any fiat surface, 2030 Center Prep 8 Paint
Bradford Avenue G2060 Bike Rack, Fixed 1-5 Bikes, 2030
Pedestrian Bridge Replace
City Corporate
Yard Building
C2030 Flooring, Carpet, Commercial 2030
Standard, Replace
Fire Station 1 E1030 Laundry Equipment, Washer, 2030
Commercial, Replace
O Fair 20 6 $ 16,000 $ - $ - $ - $ - $ - $ - $ 19,105 $ - $ - $ O Fair 20 6 $ 12,160 $ - $ - $ - $ - $ - $ - $ 14,520 $ - $ - $ O Fair 20 6 $ 49,600 $ - $ - $ - $ - $ - $ - $ 59,225 $ $ - $ O Fair 20 6 $ 6,400 $ - $ - $ - $ - $ - $ - $ 7,642 $ - $ - $ O Fair 20 6 $ 19,200 $ $ - $ - $ - $ - $ - $ 22,926 $ - $ - $ O Fair 15 6 $ 22,400 $ $ - $ - $ - $ - $ - $ 26,747 $ - $ - $ O Fair 15 6 $ 9,920 $ - $ - $ - $ - $ - $ - $ 11,845 $ - $ - $ O Fair 15 6 $ 7,200 $ - $ - $ $ - $ - $ - $ 8,597 $ - $ - $ O Fair 6 $ 8,640 $ - $ - $ - $ - $ - $ - $ 10,317 $ - $ - $ O Fair 15 6 $ 21,760 $ $ - $ $ - $ - $ - $ 25,983 $ - $ - $ O Excellent 10 3 $ 38,400 $ $ - $ $ - $ - $ - $ 45,852 $ - $ - $ O Good 10 6 $ 15,360 $ $ - $ $ - $ - $ - $ 18,341 $ - $ - $ O Good 10 6 $ 7,680 $ $ - $ $ - $ - $ - $ 9,170 $ - $ - $ O Good 10 6 $ 6,400 $ $ - $ $ - $ - $ - $ 7,642 $ - $ - $ O Fair 10 6 $ 16,640 $ $ - $ $ - $ - $ - $ 19,869 $ - $ - $ O Fair 10 6 $ 52,480 $ $ - $ $ - $ - $ - $ 62,664 0 - $ - $ O Good 5 6 $ 3,840 $ $ - $ $ - $ - $ - $ 4,585 0 - $ - $ O Good 3 6 $ 21,600 $ $ - $ $ - $ - $ - $ 25,792 $ - $ - $ O Good 3 6 $ 20,800 $ $ - $ $ - $ - $ - $ 24,836 $ - $ - $
Building
Uniformat
Corte
Cost Description
Project
Year
Comments
Rating Priority Remaining Score Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Fire Station 2 E1030 Laundry Equipment, Washer, 2030
Commercial, Replace
City Hall (with D7050 Fire Alarm Panel, Fully 2031
Police Station) Addressable, Replace
Goldenrod Park G2050 Play Structure, Swing Set, 4 Seats, 2031 Replace
Whitten D4010 Fire Suppression System, Existing 2031
Community Center Sprinkler Heads, by SF, Replace
Richard Samp G2050 Play Structure, Multipurpose,
Park Medium, Replace
Champions Sports Roofing, Clay/Concrete Tile,
Park - Snack B3010 Replace
Shack
Roof Appurtenances, Gutters 8
Fire Station 1 B3020 Downspouts, Aluminum w/
Fittings, Replace
Fire Station 2 B3060 Roof Skylight, per unit, up to 20
SF, Replace
Parque de Los
Vaqueros - B3010 Roofing, Metal, Replace
Restroom Building
Bradford Avenue
Pedestrian Bridge
Aguirre
Community Center
Champions Sports
Park - Snack
Shack
City Corporate
Yard Building
City Hall (with
Police Station)
D7030
D7030
D7030
D7030
D7030
Fire Station 1 D7030
Fire Station 2 D7030
Backs Community
Center
Whitten
Community Center
D7030
D7030
Old City Hall D7030
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
2031
2031
2031
2031
2031
2031 Operational lease costs (annual)
2031 Operational lease costs (annual)
2031 Operational lease costs (annual)
2031 Operational lease costs (annual)
2031 Operational lease costs (annual)
2031 Operational lease costs (annual)
2031 Operational lease costs (annual)
2031 Operational lease costs (annual)
2031 Operational lease costs (annual)
2031 Operational lease costs (annual)
O Good 3 6 $ 20,800 $ - $ - $ - $ - $ - $ - $ 24,836 $ - 5 - $ O Fair 40 7 $ 48,000 $ $ - $ $ - $ - $ - $ - $ 59,034 $ - $ O Fair 40 7 $ 8,000 $ $ - $ $ - $ - $ - $ $ 9,839 $ - $ O Fair 40 7 $ 31,768 $ $ - $ $ - $ - $ - $ - $ 39,071 $ - $ O Fair 40 7 $ 64,000 $ $ - $ $ - $ - $ - $ $ 78,712 $ - $ O Fair 35 7 $ 125,664 $ $ - $ $ - $ - $ - $ - $ 154,551 $ - $ O Fair 35 7 $ 1,267 $ - $ - $ - $ - $ - $ - $ $ 1,558 $ - $ O Fair 35 7 $ 8,320 $ - $ - $ - $ - $ - $ - $ $ 10,233 $ - $ O Fair 35 7 $ 45,760 $ $ - $ - $ - $ - $ - $ - $ 56,279 $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ 14,758 $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ 14,758 $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ 14,758 $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ 14,758 $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ 14,758 $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ 14,758 $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ 14,758 $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ 14,758 $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ 14,758 $ - $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ 14,758 $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Score Useful Life
Gomez D7030
Community Center
Placentia Teen
Center
D7030
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
2031 Operational lease costs (annual)
2031 Operational lease costs (annual)
Champions Sports Parking/Roadway Lighting, Pole -
Park - Site G4050 Mounted, any type w/ LED, 2031
Replace
Champions Sports Parking/Roadway Lighting, Pole -
Park - Site G4050 Mounted, any type w/ LED, 2031
Replace
Champions Sports Packing/Roadway Lighting, Pole -
Park - Site G4050 Mounted, any type w/ LED, 2031
Replace
City Corporate
Yard - Open
Garage
City Corporate
Yard - Open
Garage
City Hall (with
Police Station)
City Hall (with
Police Station)
D3020 Unit Heater, Natural Gas, Replace 2031
Interior Lighting System, Full
D5040 Upgrade, Medium Density & 2031
Standard Fixtures, Replace
D2010 Water Heater, Gas, Commercial 2031
(125 MBH), Replace
D3020 Boiler, Gas, HVAC, Replace
Fire Station 1 D2060 Air Compressor, Tank -Style,
Fire Station 2
Replace
D2060 Air Compressor, Tank -Style,
Replace
Fire Station 2 D3060 Exhaust Fan, Centrifugal, 24"
Damper, Replace
Exhaust Fan, Roof or Wall -
2031
2031
2031
2031
Fire Station 2 D3060 Mounted, 10" Damper, Replace 2031
Backs Community D2010 Water Heater, Gas, Residential, 2031 Data tag hidden by insulation.
Center Replace
Perque de Los D2010 Backflow Preventer, Domestic 2031
Ninos - Site Water, Replace
Plumbing System, Supply &
Tynes Gym D2010 Sanitary, Medium Density 2031
(excludes fixtures), Replace
Backs Community D2010 Drinking Fountain, Wall -Mounted, 2031 Center Bi -Level, Replace
Gomez D2010 Toilet, Commercial Water Closet, 2031
Community Center Replace
Gomez D2010 Sink/Lavatory, Wall -Hung,
Community Center Vitreous China, Replace
2031
NA 30
NA 30
O Fair 30
O Fair 30
O Fair 30
O Fair 30
O Fair 30
O Fair 30
O Fair 30
O Fair 30
O Fair 30
O Fair 30
O Fair 30
Fair 30
O Fair 30
O Fair 30
O Fair 25
O Fair 25
O Fair 25
0 $ 12,000 $ $ - $ - $ - $ - $ - $
0 $ 12,000 $ $ - $ - $ - $ - $ - $
7 $ 19,200 $ - $ - $ - $ - $
7 $ 19,200 $ - $ - $ - $
7 $ 19,200 $ - $ - $
7 $ 13,120 $ - $ - $ - $ - $ - $ - $
7 $ 115,200 $ $ - $ - $ - $ - $ - $
7 $ 39,680 $ $ - $ $ - $ - $
7 $ 65,280 $ $ - $ $ - $ - $
7 $ 23,264 $ $ - $ $ - $ - $
7 $ 50,880 $ $ - $ $ - $ - $
7 $ 9,600 $ - $ - $ - $ - $ - $ - $
7 $ 7,680 $ - $ - $ - $ - $ - $ - $
7 $ 4,160 $ $ - $ - $ - $ - $ - $
7 $ 4,480 $ - $ - $ - $ - $ - $ - $
7 $ 228,800 $ $ - $ $ - $ - $ - $
7 $ 4,800 $ $ - $ $ - $ - $ - $
7 $ 12,480 $ $ - $ $ - $ - $
7 $ 9,600 $ $ - $ $ - $ - $
- $ 14,758 $ - $
$ 14,758 $ - $
$ 23,614 $ - $
$ 23,614 $ - $
$ 23,614 $ - $
$ 16,136 $ - $
- $ 141,681 $ - $
$ 48,801 $ - $
- $ 80,286 $ - $
$ 28,612 $ - $
- $ 62,576 $ - $
- $ 11,807 $ - $
$ 9,445 $ - $
$ 5,116 $ - $
$ 5,510 $ - $
- $ 281,395 $ - $
$ 5,903 $ - $
$ 15,349 $ - $
$ 11,807 $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Score Useful Life
Parque de Los
Ninos - Pool
Building
D2010 Sink/Lavatory, Wall -Hung,
Vitreous China, Replace
2031
Champions Sports Athletic Surfaces & Courts,
Park - Site G2050 Basketball/General, Asphalt 2031
Pavement, Seal & Stripe
Tuffree Park - Site 52050 Athletic Surfaces, Diamond Field, 2031 Infield Soil, Maintain
Champions Sports G2050 Sports Apparatus, Scoreboard, 2031 Park - Site Electronic Basic, Replace
Edwin T. Powell
Building
52080 Irrigation System, Pop -Up Spray 2031
Heads, Commercial, Replace
Kraemer Memorial 52050 Sports Apparatus, Exercise Station 2031 Park - Site Parks, Standard, Replace
McFadden Park - G2080 Irrigation System, Control Panel, 2031 Site Replace
Gomez C1090 Toilet Partitions, Wood, Replace 2031
Community Center
Parque del Arroyo Exterior Door, Wire Mesh Metal,
Verde - Restroom B2050 Gate, Replace 2031
Building
Richard Samp
Park
Park Bench,
G2060 Wood/Composite/Fiberglass, 2031
Replace
Santa Fe Park 52050 Sports Apparatus, Exercise Station 2031 Parks/Trails, Standard, Replace
Tynes Gym B2050 Exterior Door, Steel, Standard, 2031
Replace
Fire Station 2 E1030 Foodservice Equipment, Icemaker, 2031 Freestanding, Replace
Fire Station 2 E1030 Foodservice Equipment, Exhaust 2031 Hood, 3 to 6 LF, Replace
Koch Park E1030 Foodservice Equipment, Icemaker, 2031
Community Center Freestanding, Replace
City Hall (with
Police Station)
C1070 Suspended Ceilings, Acoustical
Tile (ACT), Replace
2031
Whitten Suspended Ceilings, Acoustical
Community Center C1070 Tile (ACT), Replace 2031
Koch Park C2050 Ceiling Finishes, exposed irregular 2031 Community Center elements, Prep & Paint
Backs Community C2030 Flooring, Vinyl Tile (VCT), Replace 2031 Center
O Fair 25
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 15
O Fair 15
O Fair 15
O Fair 10
O Fair 10
O Good 3
O Good 3
7 $ 9,600 $ - $ - $
2 $ 9,936 $ - $ - $
3 $ 38,400 $ - $ - $
7 $ 28,800 $ - $ - $
7 $ 10,080 $ - $ - $
7 $ 32,000 $ - $ - $
7 $ 16,000 $ - $ - $
7 $ 3,200 $ - $ - $
7 $ 12,160 $
7 $ 3,840 $
7 $ 28,800 $
7 $ 15,360 $
7 $ 21,440 $
7 $ 10,560 $
7 $ 21,440 $
7 $ 162,400 $
7 $ 85,120 $
7 $ 12,800 $
7 $ 104,000 $
- $ 11,807 $ - $
- $ 12,220 $ - $
$ 47,227 $ - $
$ 35,420 $ - $
$ 12,397 $ - $
$ 39,356 $ - $
- $ 19,678 $ - $
$ 3,936 $ - $
$ 14,955 $ - $
$ 4,723 $ - $
$ 35,420 $ - $
$ 18,891 $ - $
$ 26,368 $ - $
$ 12,987 $ - $
$ 26,368 $ - $
- $ 199,731 $ - $
- $ 104,687 $ - $
$ 15,742 $ - $
- $ 127,907 $ - $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost
Score Useful Life
2024 2025 2026 2027 2028 2029 .l 2030 2031 J..
2032 ■ 2033
Wagner Park
G2050 Playneld Surfaces, Chips Wood, 3" 2032
Depth, Replace
Gomez 03010 Roofing, Asphalt Shingle, 20 -Year 2032
Community Center Standard, Replace
Parquede Los Roofing, Clay/Concrete Tile,
Ninos -
Ninos - Pool 03010 Replace
Building
Placentia Avenue Roof Skylight, per unit, up to 20
Storm Water 03060 SF, Replace
Pump Station
Bradford Avenue
Pedestrian Bridge
Aguirre
Community Center
D7030
D7030
Champions Sports
Park - Snack D7030
Shack
City Corporate D7030
Yard Building
City Hall (with D7030
Police Station)
Fire Station 1 D7030
Fire Station 2 D7030
Backs Community D7030
Center
Whitten D7030
Community Center
Old City Hall D7030
Gomez
Community Center
Placentia Teen
Center
City Hall (with
Police Station)
D7030
D7030
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
D5010 Uninterruptible Power Supply,
Individual Battery, Replace
Aguirre Plumbing System, Supply &
Community Center D2010 Sanitary, Medium Density
(excludes fixtures), Replace
Aguirre Electncal System, Wiring &
Community Center D5030 Switches, Average or Low
Density/Complexity, Replace
2032
2032
2032 Operational lease costs (annual)
2032 Operational lease costs (annual)
2032 Operational lease costs (annual)
2032 Operational lease costs (annual)
2032 Operational lease costs (annual)
2032 Operational lease costs (annual)
2032 Operational lease costs (annual)
2032 Operational lease costs (annual)
2032 Operational lease costs (annual)
2032 Operational lease costs (annual)
2032 Operational lease costs (annual)
2032 Operational lease costs (annual)
2032
2032
2032
O Fair 40 2 $ 16,640 $ $ - $ - $ - $ - $ - $ $ - $ 21,079 $ O Fair 35 8 $ 47,242 $ $ - $ - $ - $ - $ - $ $ - $ 59,845 $ O Fair 35 8 $ 30,192 $ $ - $ - $ - $ - $ - $ $ - $ 38,246 $ O Fair 35 8 $ 12,480 $ $ - $ - $ - $ - $ - $ $ - $ 15,809 $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ - $ 15,201 $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ - $ 15,201 $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ - $ 15,201 $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ - $ 15,201 $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ - $ 15,201 $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ - $ 15,201 $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ - $ 15,201 $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ - $ 15,201 $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ - $ 15,201 $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ - $ 15,201 $ NA 30 0 $ 12,000 $ $ - $ - $ - $ - $ - $ - $ - $ 15,201 $ NA 30 0 $ 12,000 $ $ - $ $ - $ - $ - $ - $ - $ 15,201 $ O Fair 30 3 $ 5,120 $ $ - $ $ - $ - $ - $ $ - $ 6,486 $ O Fair 30 8 $ 99,088 $ $ - $ $ - $ - $ - $ $ $ 125,522 $ O Fair 30 8 $ 22,520 $ $ - $ $ - $ - $ - $ $ $ 28,528 $
Building
Uniformat
Corte
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost
Score Useful Life
2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 I
Champions Sports Plumbing System, Supply &
Park - Snack D2010 Sanitary, Medium Density
Shack (excludes fixtures), Replace
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
2032
D3050 Pump, Distribution, HVAC Heating 2032
Water, Replace
D3050 Pump, Dismbution, HVAC Heating 2032
Water, Replace
D3050 Fan CoA Unit, Hydronic Terminal, 2032
Replace
D3050 Packaged Unit, RTU, Pad or Roof- 2032
Mounted, Replace
D3060
Exhaust Fan, Roof or Wall -
Mounted, 10' Damper, Replace
2032
Pole Light Fixture w/ Lamps, any
G4050 type 20' High, w/ LED 2032
Replacement, Replace/Install
G4050 Exterior Fixture w/ Lamp, any type, 2032
w/ LED Replacement, Replace
Fire Station 1 G4050 Exterior Fixture w/ Lamp, any type, 2032 w/ LED Replacement, Replace
Interior Lighting System, Full
Fire Station 2 D5040 Upgrade, Medium Density & 2032
Standard Fixtures, Replace
Fire Station 2 G4050 Exterior Fixture w/ Lamp, any type, 2032 w/ LED Replacement, Replace
Backs Community Computer Room AC Unit, Air -
Center D3030 Cooled, CRAC
Drycooler/Condenser, Replace
Backs Community Computer Room AC Unit, Air -
Center D3030 Cooled, CRAC
Drycooler/Condenser, Replace
Backs Community Computer Room AC Unit, Air -
Center D3030 Cooled, CRAC
Drycooler/Condenser, Replace
2032
2032
2032
Backs Community G4050 Exterior Fixture w/ Lamp, any type, 2032 Center w/ LED Replacement, Replace
Kraemer Memorial Interior Lighting System, Full
Park - Restroom D5040 Upgrade, Low Density & Standard 2032 Building Fixtures, Replace
Kremer Memorial D2010 Backflow Preventer, Domestic 2032 Park - Site Water, Replace
Kraemer Storni Circulation Pump, Circulation
Water Pump D5030 pump, Replace
Station
2032 Assumed capacity; area not accessed due to safety concerns.
McFadden Park - Storage Tank, Chemical, Interior,
Pool Equipment D3010 Replace 2032
Building
O Fair 30 8 $ 81,312 $ $ - $ - $ - $ - $ - $ $ - $ 103,004 $ O Fair 30 8 $ 21,216 $ $ - $ - $ - $ - $ - $ $ - $ 26,876 $ O Fair 30 8 $ 21,216 $ $ - $ - $ - $ - $ - $ $ - $ 26,876 $ O Fair 30 8 $ 132,127 $ $ - $ $ - $ - $ - $ $ - $ 167,375 $ O Fair 30 8 $ 35,904 $ $ - $ $ - $ - $ - $ $ - $ 45,482 $ O Fair 30 8 $ 7,834 $ - $ - $ - $ - $ - $ - $ $ - $ 9,924 $ O Fair 30 8 $ 255,360 $ $ - $ - $ - $ - $ - $ $ - $ 323,482 $ O Fair 30 8 $ 17,280 $ - $ - $ - $ - $ - $ - $ - $ - $ 21,890 $ O Fair 30 8 $ 7,680 $ - $ - $ - $ - $ - $ - $ $ $ 9,729 $ O Fair 30 8 $ 73,440 $ $ - $ $ - $ - $ - $ $ $ 93,032 $ O Fair 30 8 $ 11,520 $ $ - $ $ - $ - $ - $ $ - $ 14,593 $ O Fair 30 8 $ 20,160 $ $ - $ - $ - $ - $ - $ $ - $ 25,538 $ O Fair 30 8 $ 20,160 $ $ - $ - $ - $ - $ - $ $ - $ 25,538 $ O Fair 30 8 $ 20,160 $ $ - $ - $ - $ - $ - $ $ - $ 25,538 $ O Fair 30 8 $ 8,960 $ $ - $ $ - $ - $ - $ $ - $ 11,350 $ O Fair 30 8 $ 4,200 $ $ - $ $ - $ - $ - $ $ - $ 5,320 $ O Fair 30 8 $ 21,120 $ $ - $ $ - $ - $ - $ $ - $ 26,754 $ Fair 30 8 $ 90,880 $ $ - $ $ - $ - $ - $ $ - $ 115,124 $ O Fair 30 8 $ 8,320 $ $ - $ $ - $ - $ - $ - $ - $ 10,540 $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 I Score Useful Life
Gomez D2010 Pump, Circulation/Booster,
Community Center Domestic Water, Replace
2032
Gomez D5040 Lighting Controls, Dimming Panel, 2032
Community Center Standard, Replace
Gomez Interior Lighting System, Full
Community Center D5040 Upgrade, Medium Density & 2032
Standard Fixtures, Replace
Gomez G4050 Exterior Fixture w/ Lamp, any type, 2032
Community Center w/ LED Replacement, Replace
Placentia Avenue Variable Frequency Drive, VFD, by
Storm Water D5030 HP of Motor, 20 HP, Replace 2032
Pump Station
City Corporate
Yard Building
D2010 Sink/Lavatory, Vanity Top,
Stainless Steel, Replace
Backs Community D2010 Sink/Lavatory, Drop -In Style,
Center Vitreous China, Replace
Gomez D2010 Sink/Lavatory, Vanity Top,
Community Center Enameled Steel, Replace
Parque de Los
Ninos - Site
D2010 Drinking Fountain, Exterior/Site,
Metal Pedestal, Replace
2032 Hot water is not being delivered to this sink.
2032
2032
2032
Champions Sports G2020 Parking Lots, Pavement, Asphalt, 2032 Park - Site Seal &Stripe
Champions Sports 52020 Parking Lots, Pavement, Asphalt, 2032 al&
Park - Site SeStripe
City Hall (with
Police Station)
City Hall (with
Police Station)
Edwin T. Powell
Building
Parque de Los
Ninos - Site
Parque de Los
Ninos - Site
Bradford Park
52020 Parking Lots, Pavement, Asphalt, 2032
Seal & Stripe
52020 Parking Lots, Pavement, Asphalt, 2032
Seal & Stripe
52020 Parking Lots, Pavement, Concrete, 2032
Crack Fill & Stripe
Athletic Surfaces & Courts,
G2050 Basketball/General, Asphalt 2032
Pavement, Seal & Stripe
Athletic Surfaces & Courts,
G2050 Basketball/General, Asphalt 2032
Pavement, Seal & Stripe
52030 Sidewalk, Brick/Masonry Pavers, 2032
Replace
Champions Sports G2020 Parking Lots, Pavement, Asphalt, 2032 Park - Site Mill &Cveday
Champions Sports G2020 Parking Lots, Pavement, Asphalt, 2032 Park - Site Mill &Cveday
O Fair 30
O Fair 30
O Fair 30
O Fair 30
O Fair 30
Fair 25
O Fair 25
O Fair 25
0 Fair 25
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
O Fair 20
8 $ 16,320 $ $ - $ - $ - $ - $ - $ $ - $ 20,674 $
8 $ 5,632 $ - $ - $ - $ - $ - $ - $ $ - $ 7,134 $
8 $ 55,944 $ $ - $ $ - $ - $ - $ $ $ 70,868 $
8 $ 15,360 $ $ - $ $ - $ - $ - $ $ $ 19,458 $
8 $ 32,000 $ $ - $ $ - $ - $ - $ $ $ 40,537 $
8 $ 3,840 $ $ - $ $ $ - $ - $ $ - $ 4,864 $
8 $ 3,520 $ - $ - $ - $ - $ - $ - $ $ $ 4,459 $
8 $ 3,520 $ - $ - $ - $ - $ - $ - $ $ - $ 4,459 $
8 $ 4,800 $ - $ - $ - $ - $ - $ - $ $ $ 6,080 $
3 $ 18,720 $ $ - $ - $ - $ - $ - $ $ $ 23,714 $
3 $ 51,840 $ - $ - $ - $ - $ - $ - $ - $ - $ 65,669 $
3 $ 111,600 $ $ - $ - $ - $ - $ - $ - $ - $ 141,372 $
3 $ 13,824 $ - $ - $ $ - $ - $ - $ - $ - $ 17,512 $
3 $ 2,660 $ $ - $ $ - $ - $ - $ - $ - $ 3,370 $
3 $ 4,147 $ $ - $ $ - - $ - $ - $ - $ 5,253 $
3 $ 3,197 $ $ - $ $ - $ - $ - $ - $ - $ 4,050 $
8 $ 93,984 $ $ - $ $ - $ - $ - $ $ $ 119,056 $
8 $ 147,840 $ $ - $ $ - $ - $ - $ $ - $ 187,279 $
8 $ 145,600 $ $ - $ $ - $ - $ - $ $ $ 184,442 $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 I Score Useful Life
Champions Sports G2020 Parking Lots, Pavement, Asphalt, 2032 Park - Site Mill &Overlay
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
B2050 Overhead/Dock Door, Aluminum, 2032
20'x20' (400 SF), Replace
B2050 Overhead/Dock Door, Aluminum, 2032
205,20' (400 SF), Replace
C1090 Toilet Partitions, Metal, Replace 2032
C1090 Lockers, Steel -Baked Enamel, 12" 2032
Wx15"Dtx72"H,Replace
Fences & Gates, Vehicle Gate,
Fire Station 1 G2060 Chain Link Sliding Electric,
Replace
Fire Station 1 G2060 Signage, Property, Monument,
Replace/Install
2032
2032
Imgabon System, Pop -Up Spray
Fire Station 1 G2080 Heads, Commercial, 2032
Replace/Install
Koch Park - Site G2050 Sports Apparatus, Player/Dugout 2032 Benches, 12' Length, Replace
Kraemer Memorial Sports Apparatus,
Park
raer Site G2050 Baseball/Football, Protective
Netting, Replace
2032
Park Bench, Metal Powder -Coated,
Kraemer Memorial G2060 2032
Park - Site Replace
Picnic Table,
Kmemer Memorial
Park Site G2060 Wood/Composite/Fiberglass,
Replace
Kraemer Memorial G2060 Park Bench, Wood, Replace
Park - Site
2032
2032
Kraemer Memorial G2060 Signage, Property, Building or Pole 2032 Park - Site Mounted, Replace/Install
Kraemer Memorial G2060 Dumpster Enclosure, Gates, Metal, 2032 Park - Site Replace/Install
Kraemer Storm
Water Pump
Station
Fire Alarm System, Full System
D7050 Upgrade, Standard Addressable, 2032
Install
McFadden Park -
Pool Equipment F1050 pool Equipment, Gas Heater, Building Replace 2032
McFadden Park- G2020 Parking Lots, Pavement, Asphalt, 2032 Site Overlay
McFadden Park - G2060 Signage, Property, Monument,
Site Replace/Install
2032
O Fair 20 8 $ 403,200 $ $ - $ - $ - $ - $ - $ $ - $ 510,762 $ O Fair 20 8 $ 32,000 $ - $ - $ - $ - $ - $ - $ $ - $ 40,537 $ O Fair 20 8 $ 32,000 $ - $ - $ - $ - $ - $ - $ $ $ 40,537 $ O Fair 20 8 $ 16,320 $ - $ - $ $ - $ - $ - $ $ $ 20,674 $ O Fair 20 8 $ 240,000 $ $ - $ $ - $ - $ - $ $ - $ 304,025 $ O Fair 20 8 $ 16,000 $ $ - $ $ - $ - $ - $ $ - $ 20,268 $ O Fair 20 8 $ 9,600 $ $ - $ $ - $ - $ - $ $ - $ 12,161 $ O Fair 20 8 $ 4,640 $ $ - $ $ - $ - $ - $ $ - $ 5,878 $ O Fair 20 8 $ 5,760 $ $ - $ $ - $ - $ - $ $ - $ 7,297 $ O Fair 20 8 $ 4,864 $ $ - $ $ - $ - $ - $ - $ - $ 6,162 $ O Fair 20 8 $ 4,480 $ $ - $ $ - $ - $ - $ - $ - $ 5,675 $ O Fair 20 8 $ 42,240 $ $ - $ $ - $ - $ - $ $ - $ 53,508 $ O Fair 20 8 $ 7,680 $ $ - $ $ - $ - $ - $ $ - $ 9,729 $ O Fair 20 8 $ 9,600 $ $ - $ $ - $ - $ - $ $ - $ 12,161 $ O Fair 20 8 $ 10,880 $ $ - $ $ - $ - $ - $ $ - $ 13,782 $ O Good 20 8 $ 3,840 $ $ - $ $ - $ - $ - $ $ - $ 4,864 $ O Fair 20 8 $ 25,600 $ $ - $ $ - $ - $ - $ $ - $ 32,429 $ O Fair 20 8 $ 115,200 $ $ - $ $ - $ - $ - $ $ - $ 145,932 $ O Fair 20 8 $ 9,600 $ $ - $ $ - $ - $ - $ $ - $ 12,161 $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Score Useful Life Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 I McFadden Park - Imgation System, Pop -Up Spray
Site G2080 Heads, Commercial, 2032
Replace/Install
Parque de Los G2060 Bike Rack, Fixed 1-5 Bikes, 2032
Ninos - Site Replace
Richard Samp
Park
Park Bench,
G2060 Wood/Composite/Fiberglass, 2032
Replace
Santa Fe Park G2080 Imgabon System, Control Panel, 2032 Replace
Foodservice Equipment,
Fire Station 2 E1030 Range/Oven, 4 -Burner w/ Griddle, 2032 Replace
City Hall (with
Police Station)
City Hall (with
Police Station)
City Hall (with
Police Station)
C2010 Wall Finishes, Fabric, Replace 2032
E2010 Casework, Cabinetry, Hardwood 2032
Standard, Replace
E2010 Casework, Countertop, Solid 2032
Surface, Replace
Fire Station 1 C2030 Flooring, Vinyl Tile (VCT), Replace 2032 Kraemer Storm Exterior Site Lighting, Wall Pack,
Water Pump G4050 any type w/ LED, 50 to 105 W, 2032
Station Replace
Parque de Los
Ninos - Site
Pole Light Fixture w/ Lamps, any
G4050 type 20' High, w/ LED 2032
Replacement, Replace/Install
Bradford Avenue G2020 Parking Lots, Pavement, Asphalt, 2032 Pedestrian Bridge Seal & Stripe
Bradford Park
Parque de Los
Ninos - Site
G2080 Landscaping, Ground Cover, 2032
Repair
G2060 Trash Receptacle, Medium -Duty 2032
Metal or Precast, Replace
Athletic Surfaces & Courts,
Tuffree Park - Site G2050 TennisNolleyball, 2 -Color Surface, 2032 Seal & Stnpe
Athletic Surfaces & Courts,
Tuffree Park - Site G2050 TennisNolleyball, Rubber -Acrylic 2032 w/ Integral Color, Resurface
Bradford Avenue C2010 Wall Finishes, any surface, Prep & 2032 Pedestrian Bridge Paint
Bradford Avenue C2050 Ceiling Finishes, any Oat surface, 2032 Pedestrian Bridge Prep & Paint
Champions Sports
Park - Snack C2030 Flooring, Wood, Strip, Replace 2032
Shack
O Fair 20 8 $ 179,840 $ $ - $ - $ - $ - $ - $ $ - $ 227,816 $ O Fair 20 8 $ 1,920 $ - $ - $ - $ - $ - $ - $ $ $ 2,432 $ O Fair 20 8 $ 11,520 $ - $ - $ - $ - $ - $ - $ $ $ 14,593 $ O Fair 20 8 $ 24,000 $ - $ - $ - $ - $ - $ - $ $ - $ 30,402 $ O Fair 8 $ 21,440 $ - $ - $ - $ - $ - $ - $ $ - $ 27,160 $ 0 Fair 8 $ 15,360 $ - $ - $ - $ - $ - $ - $ $ - $ 19,458 $ O Fair 10 8 $ 7,680 $ $ - $ $ - $ - $ - $ $ - $ 9,729 $ O Fair 10 8 $ 2,816 $ $ - $ $ - $ - $ - $ - $ - $ 3,567 $ O Fair 10 8 $ 12,800 $ $ - $ $ - $ - $ - $ $ - $ 16,215 $ O Good 10 8 $ 7,680 $ $ - $ $ - $ - $ - $ $ $ 9,729 $
O Good 10 8 $ 51,200 $ $ - $ $ - $ - $ - $ $ $ 64,859 $ O Good 5 3 $ 38,880 $ $ - $ $ - $ - $ - $ $ - $ 49,252 $ O Good 5 8 $ 757,760 $ $ - $ $ - $ - $ - $ $ - $ 959,908 $ O Good 5 8 $ 13,440 $ $ - $ $ - $ - $ - $ $ - $ 17,025 $ O Good 8 $ 68,352 $ - $ - $ - $ - $ - $ - $ $ - $ 86,586 $ O Good 8 $ 205,056 $ $ - $ - $ - $ - $ - $ $ - $ 259,759 $ O Good 3 8 $ 12,240 $ $ - $ $ - $ - $ - $ $ - $ 15,505 $ O Good 3 8 $ 28,160 $ $ - $ $ - $ - $ - $ $ $ 35,672 $
O Good 3 8 $ 14,400 $ $ - $ $ - $ - $ - $ $ $ 18,241 $
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost
Score Useful Life
2024 2025 2026 2027 2028 2029 2030 2031 J..
2032 ■ 2033
Koch ParkWall Finishes, any surface, Prep &
Community Center C2010 Paint 2032
Old City Hall
Old City Hall
Old City Hall
Richard Samp
Park
Bradford Avenue
Pedestrian Bridge
Aguirre
Community Center
Champions Sports
Park - Snack
Shack
City Corporate
Yard Building
City Hall (with
Police Station)
Fire Station 1
Fire Station 2
Backs Community
Center
Whitten
Community Center
Exterior Walls, Stucco, Prep & Fog
B2010 Coat or Paint, Prep & Fog Coat or 2032
Paint
C2010 Wall Finishes, any surface, Prep & 2032
Paint
C2050 Ceiling Finishes, any Oat surface, 2032
Prep & Paint
G2050 Playfield Surfaces, Sand, 3" Depth, 2033
Replace
D7030
D7030
D7030
D7030
D7030
D7030
D7030
D7030
D7030
Old City Hall D7030
Gomez
Community Center
Placentia Teen
Center
D7030
D7030
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
Security/Surveillance System,
Lease Costs for
Security/Surveillance System,
Lease
2033 Operational lease costs (annual)
2033 Operational lease costs (annual)
2033 Operational lease costs (annual)
2033 Operational lease costs (annual)
2033 Operational lease costs (annual)
2033 Operational lease costs (annual)
2033 Operational lease costs (annual)
2033 Operational lease costs (annual)
2033 Operational lease costs (annual)
2033 Operational lease costs (annual)
2033 Operational lease costs (annual)
2033 Operational lease costs (annual)
McFadden Park- Parking/Roadway Lighting, Pole -
Site G4050 Mounted, any type wl LED, 2033
Replace
City Hall (with
Police Station)
D2010 Drinking Fountain, Wall -Mounted, 2033
Single -Level, Replace
O Good 3 8 $ 9,600 $ - $
O Good 3 8 $ 34,227 $ - $
O Good 3 8 $ 31,200 $ - $
O Good 3 8 $ 5,120 $
O Fair 40 9 $ 5,632 $ - $
NA 30 0 $ 12,000 $
NA 30 0 $ 12,000 $
NA 30 0 $ 12,000 $
NA 30 0 $ 12,000 $
NA 30 0 $ 12,000 $
NA 30 0 $ 12,000 $
NA 30 0 $ 12,000 $
NA 30 0 $ 12,000 $
NA 30 0 $ 12,000 $
NA 30 0 $ 12,000 $
NA 30 0 $ 12,000 $
NA 30 0 $ 12,000 $
O Fair 30 9 $ 23,040 $
O Fair 25 9 $ 7,680 $
- $ 12,161 $
- $ 43,358 $
- $ 39,523 $
- $ - $ - $ - $ - $ - $ - $ - $ 6,486 $
$ _ $
$ - $ 7,348
$ - $ - $ - $ - $ - $ - $ - $ 15,657
$ - $ - $ - $ - $ - $ - $ - $ 15,657
$ - $ - $ - $ - $ - $ - $ - $ 15,657
$ - $ - $ - $ - $ - $ - $ - $ 15,657
$ - $ - $ - $ - $ - $ - $ - $ 15,657
$ - $ - $ - $ - $ - $ - $ - $ 15,657
$ - $ - $ - $ - $ - $ - $ - $ 15,657
$ - $ - $ - $ - $ - $ - $ - $ 15,657
$ - $ - $ - $ - $ - $ - $ - $ 15,657
$ - $ - $ - $ - $ - $ - $ 15,657
$ - $ - $ - $ - $ - $ - $ 15,657
$ - $ - $ - $ - $ - $ - $ 15,657
$ _ $
$ - $ 30,062
- $ - $ - $ - $ - $ - $ 10,021
Building
Uniformat
Code
Cost Description
Project
Year
Comments
Rating Priority Remaining Current Cost 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Score Useful Life
Koch Park 02010 Toilet, Commercial Water Closet, 2033 0 Fair 25 Community Center Replace
Koch Park - Site G2050 Sports Apparatus, Baseball, 2033 0 Fair 20 Batting Cage, Replace
Koch Park - Site G2050 Sports Apparatus, Baseball, 2033 0 Fair 20 Backstop Chain -Link, Replace
Irrigation System, Pop -Up Spray
Koch Park - Site G2080 Heads, Commercial, 2033 0 Fair 20 Replace/Install
Backs Community B2050 Exterior Door, Wood, Solid -Core, 2033 0 Fair 20 Center Replace
McFadden Park - Pool Equipment, Filtration System,
Pool Equipment F1050 Replace 2033 0 Fair 20
Building
McFadden Park - F1050 Pool Equipment, Circulation 2033 Please note this barcode tag will be replaced soon. Fair 20 Site Pump, Replace
McFadden Park - G2060 Park Bench, Metal Powder -Coated, 2033 0 Fair 20 Site Replace
Parque de Los Pool Equipment, Circulation
Ninos - Pool F1050 pump, Replace 2033 0 Fair 20
Building
Richard Samp 52080 Irrigation System, Control Panel, 2033 0 Fair 20 Park Replace
City Hall (with E1010 Charging Station, Electric Vehicle, 2033 0 Fair Police Station) Single Connection, Replace
Parque del Arroyo G2050 Playfield Surfaces, Chips Wood, 6" 2033 0 Excellent Verde - Site Depth, Replace
Edwin T. Powell C2030 Flooring, Vinyl Tile (VCT), Replace 2033 0 Fair Building
Parque del Arroyo 52020 Parking Lots, Pavement, Asphalt, 2033 0 Good Verde - Site Seal&Stripe
Koch Park C2030 Flooring, Vinyl Sheeting, Replace 2033 0 Good 3 Community Center
Backs Community C2010 Wall Finishes, any surface, Prep & 2033 0 Good 3 Center Paint
Backs Community C2030 Flooring, Carpet, Commercial Tile, 2033 0 Good 3 Center Replace
Parque del Arroyo Exterior Walls, any painted
Verde -Restroom 62010 surface, Prep &Paint 2033 0 Excellent 2 Building
9 $ 16,640 $ $ - $ $ - $ - $ - $ $ - $ - $ 21,711
9 $ 14,400 $ $ - $ $ - $ - $ - $ $ - $ - $ 18,789
9 $ 32,000 $ $ - $ $ - $ - $ - $ $ $ - $ 41,753
9 $ 577,600 $ $ - $ $ - $ - $ - $ $ $ - $ 753,637
9 $ 20,160 $ $ - $ $ - $ - $ - $ $ - $ - $ 26,304
9 $ 19,200 $ $ - $ $ - $ - $ - $ $ - $ - $ 25,052
9 $ 16,320 $ $ - $ $ - $ - $ - $ - $ - $ - $ 21,294
9 $ 4,480 $ $ - $ $ - $ - $ - $ - $ - $ - $ 5,845
9 $ 16,320 $ $ - $ $ - $ - $ - $ - $ - $ - $ 21,294
9 $ 16,000 $ $ - $ $ - $ - $ - $ - $ - $ - $ 20,876
9 $ 115,200 $ $ - $ $ - $ - $ - $ $ - $ - $ 150,310
3 $ 38,400 $ $ - $ $ - $ - $ - $ $ - $ - $ 50,103
9 $ 46,752 $ $ - $ $ - $ - $ - $ $ - $ - $ 61,001
4 $ 15,840 $ $ - $ $ - $ - $ - $ - $ - $ - $ 20,668
9 5 1,120 $ $ - $ $ - $ - $ - $ - $ - $ - $ 1,461
9 $ 55,200 $ $ - $ $ - $ - $ - $ - $ - $ - $ 72,023
9 $ 18,720 $ $ - $ $ - $ - $ - $ - $ - $ - $ 24,425
9 5 9,120 $ $ - $ $ - $ - $ - $ - $ - $ - $ 11,900