Contract Change Order No.1
Project Title: Old Town Emergency Sewer Repairs, City Project No. 3301 Owner: Clip of Placentia Contractor: Bia Ben Enaineerina You are hereby directed to make the herein described changes from the plans and specifications or to do the following described work not included in the plans and specifications on this contract:

Removal and replacement of the existing manhole on Camarillo Street. 1 This Change Order provides:
a) Extra work and credits identified in Exhibit A
$ 13,500.00
2 This Change Order came about from:
a)
During a pre -construction field visit between the contractor and public works staff, additional deterioration was discovered extending along the walls of the existing manhole, not only along the manhole bottom as originally identified. 3 Action to be taken:
a) The Contractor was directed to provide a lump sum price for this change. 4 Compensation
a) Adjustment of Line Items exceeding 25%
b) Extra work
d) Credits
Total
5 Contract Time Extension
a) 0 working days
$ 13,500.00
$ 13,500.00
In addition to work specified in the bid specifications, this change order includes all extra work, field adjustments and credits. This work is a Contractor initiated change and includes all labor, equipment, materials, and supervision and Adminstration.

CHANGE TO CONTRACT COST: CHANGE TO CONTRACT TIME:

Contract Amount: $ 135,000.00 Original Working Days: 20 Previous CCOs: $ Original Date of Completion: 3/5/2024
Adjustment of Line Items
Exceeding 25% Previous CCOs Working Days: 0
Total Extra Work $ 13,500.00 Additional Working Days: 0 Total Field Adjustments $ -
Total Credits $ - Adjusted Total of Working Days: 20
Changes in Line Items: $ 13,500.00 Adjusted Date of Completion: 4/16/2024 Current Contract price: $ 148,500.00
Prepared by:

Recommended.

Recommended.

Approved by:
�a bri e -G cce-rrt ^tr-ca ba,`cy
Gabriel Guerrero, Project Manager, City of Placentia
Chris Tanio, Deputy Director of PW/City Engineer, City of Placentia Luis Estevez, Deputy City Administrator, City of Placentia •‘...

Damien R.

Arrula, City Administrrator, City of Placentia
We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal, is approved, that we will provide all equipment, fur_ ish all materials, except as may otherwise be shown above
Accepted:
5WaA.4,?,
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.

No.
2 3
4 5
6 7
8 CCO No. 1 Exhibit 'A'
!Project Title: Old Town Emergency Sewer Repairs, City Project No, 3301 Owner: City of Placentia Contractor: Big Ben Engineering Description
Removal and replacement of existing manhole located on
Camarillo St.

Actual
Bid $$ Comments CREDIT EXTRA
Includes 20% Markup for Labor and
15% Markup for Remaining $13,500.00
LS $13,500.00
I I
I
II
1 I
$0.00
- $0.00
I -I
$0.00
$0.00
$0.00
$0.00
$0.00
Sum of Line Item Adjustments $ $13,500.00
Cost of Line Item adjustments) $
Change in Contract Costl
13,500.001
$13,500.001

MEMORANDUM
To: Damien R. Arrula, City Administrator
From: Chris Tanio, City Engineer
Date: April 24, 2024
Subject: Contract Change Order No. 1 — Big Ben Engineering for Old Town Emergency Sewer Repairs
The Public Works Department is requesting the approval of Contract Change Order (CCO) No. 1 with Big Ben Engineering. On March 19, 2024, the City Council awarded a Public Works Agreement to Big Ben Engineering in the amount of $135,000 to complete emergency sewer repairs in Old Town. The City Council also authorized the City Administrator to approve contract change orders up to 10% of the contract not -to -exceed amount, or $13,500. CCO No. 1 is for $13,500 or 10% of the construction contract amount, and within the City Administrator's administrative approval limit.

CCO No. 1 included the removal and replacement of the entire existing sanitary sewer manhole structure located on Camarillo street. The original scope included the reconstruction of the existing manhole structure bottom.

During a pre -construction field visit between the contractor and public works staff, additional deterioration was discovered extending along the walls of the existing manhole, not only along the manhole bottom as originally identified. Since the structural integrity of the manhole was compromised the contractor became concerned that removing the manhole base may lead to complete failure of the entire manhole. This failure would risk the safety of the work crew and potentially damage the connecting line and surrounding infrastructure and drastically increase the scope of the project. After discussion this concern was also repeated by public works staff.

Replacement of the entire manhole would also increase the design life of the sewer line and reduce the possibility of wastewater backups. For these reasons staff recommends approval of CCO No. 1.

The various elements comprising CCO No. 1 are summarized in Exhibit "A" attached to the CCO form. CCO No. 1 will result in a net construction contract amount of $148,500. There is sufficient funding in the remaining project budget to cover the cost of the additional work.

City of Placentia 1 Department 1 401 E. Chapman Avenue Placentia, CA 92870

If you have any questions or concerns, please contact me or Gabriel Guerrero-Gabany, Senior Civil Engineer.