Cities Index.
1.E.1 - RESOLUTION R-2024-41

Placentia City Council
June 18, 2024

Document
1.E.1 - RESOLUTION R-2024-41
Meeting
June 18, 2024
Body
Placentia City Council
Pages
1
Original file
5 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

RESOLUTION NO. R-2024-41

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

PLACENTIA, CALIFORNIA, ADOPTING A LIST OF
PROJECTS FOR FISCAL YEAR 2024-25 FUNDED BY SB 1,
THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
A. Recitals
(i). Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and
(ii). SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Placentia are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and (iii). The City of Placentia must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and
(iv). The City of Placentia will receive an estimated $1,359,908 in RMRA funding in Fiscal Year 2024-25 from SB 1; and
(v). This is the eighth year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and
(vi). The City of Placentia has undergone a robust public process to ensure public input into our community's transportation priorities/the project list; and (vii). The City of Placentia uses a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the community's priorities for transportation investment; and
(viii). The funding from SB 1 will help the City maintain and rehabilitate approximately 2.5 million square feet of local roads throughout the City this year; and (ix). The 2023 California Statewide Local Streets and Roads Needs Assessment found that the City of Placentia 's streets and roads are at lower risk and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into good condition; and Resolution R-2024-41

Page 1 of 3 ends

(x). The SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials, and practices, will have significant positive on the City of Placentia by maintaining and preserving the local street and road system in good condition will reduce drive times and traffic congestion, improve bicycle safety, and make the pedestrian experience safer and more appealing, which leads to reduce vehicle emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals.

B. Resolution

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PLACENTIA DOES HEREBY FIND, DETERMINE AND RESOLVE AS FOLLOWS:

1. The foregoing recitals are true and correct.

2. The following list of newly proposed projects will be funded in -part or solely with Fiscal Year 2024-25 Road Maintenance and Rehabilitation Account revenues:

Project Title: Fiscal Year 2023-24 Roadway Rehabilitation Project Project Description: This project repaved approximately 2.5 million square feet of arterial, collector and residential streets including Chapman Ave and Placentia Ave. Damaged sidewalk panels and curb and gutter will also be replaced as part of this project.

Project Location: The southeast corner of the City including Chapman Ave (Placentia Ave — Kraemer Blvd) and Placentia Ave (Chapman Ave -La Jolla St) Estimated Project Schedule: 08/2024 — 01/2025
Estimated Project Useful Life: 7-20 Years
Project Title: Residential Street Curb Ramps Project
Project Description: This project will design new ADA compliant curb ramps to install in residential streets throughout the City.

Project Location: Various locations throughout the City Estimated Project Schedule: 08/2024 — 12/2025
Estimated Project Useful Life: 20 Years
APPROVED and ADOPTED this 18t" day of June 2024.

Jeremy B. Yamaguchi, Mayor
ATTEST:

Resolution R-2024-41
Page2of3

Robert S. McKinnell

STATE OF CALIFORNIA

COUNTY OF ORANGE
I, Robert S. McKinnell, City Clerk of the City of Placentia, do hereby certify that the foregoing Resolution was adopted at a regular meeting of the City Council held on the 18th day of June 2024 by the following vote:

AYES: Councilmembers:

NOES: Councilmembers:

ABSENT: Councilmembers:

ABSTAIN: Councilmembers:

Robert S. McKinnell, City Clerk
APPROVED AS TO FORM:

Christian L. Bettenhausen, City Attorney
Resolution R-2024-41
Page3of3

← All documents from this meeting