1.K.1 - CIP PROJECT LIST WITH MEASURE M FUNDING

Placentia City Council
June 18, 2024

Document
1.K.1 - CIP PROJECT LIST WITH MEASURE M FUNDING
Meeting
June 18, 2024
Body
Placentia City Council
Pages
7
Original file
22 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

5/21/24, 8:44 AM ocfundtracker.octa.net/CIP/report_ project listing Orange County Transportation Authority
TIP ID CP -12361
Local Project Number: Project Title
Additional Project IDs: Atwood Trail Project
Type of Work: Bikeways Project Description
Type of Work Description: Bikeways - New bike Recreation Trail for walking and biking route
IMPLEMENTING AGENCY Placentia, City of
Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Lakeview Ave and Van Buren Street. 2025 Developer $37,200 $0 $0 $0 $37,200 $37,200 Project Notes 2025 State $272,800 $0 $0 $0 $272,800 $272,800 This trail would connect Veteran's Village to the
east with a new residential project on Van Buren
Street to the west. 0.6 -mile Atwood Multipurpose Totals: $310,000 $0 $0 $0 $310,000 $310,000 Trail along the County of Orange -maintained
Atwood Channel will provide off-street commuter
and recreational opportunities for people walking
and biking between Lakeview Avenue and Van
Buren Street. The Atwood multipurpose trail will
incentivize new active transportation users and
promote public health by providing residents a
dedicated Class I trail with full Americans with
Disabilities Act (ADA) accessibility, landscaping
enhancements, and amenities.

Last Revised: 24-00 - In Progress Total Programmed: $310,000 TIP ID CP -12339 IMPLEMENTING AGENCY Placentia, City of Local Project Number: Project Title
Additional Project IDs: Bastanchury Road Landscaped Median Renovation Type of Work: Aesthetics Project Description
Type of Work Description: Aesthetics - Median Renovation Landscaping of roadway
Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED City Limit Bastanchury Road and Placentia Ave 2025 General Fund $0 $0 $89,000 $0 $89,000 $91,670 Project Notes
Landscape Median Renovation
Last Revised: 24-00 - In Progress
TIP ID CP -12337
Local Project Number: Project Title
Additional Project IDs: Caltrans Public Art Sculpture Project Type of Work: Aesthetics Project Description
Type of Work Description: Aesthetics -
Landscaping of roadway
Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Orangethorpe Ave and HWY57 2025 General Fund $0 $0 $673,825 $0 $673,825 $694,040 Totals: $0 $0 $89,000 $0 $89,000 $91,670
Total Programmed: $89,000
IMPLEMENTING AGENCY Placentia, City of
Public Art Gateway Monument
Project Notes
This monument is a Placentia Gateway — with
"Chromatic Ascension" by Cliff Garten (the artist).

This project will be reimbursed by CalTrans.

Totals: $0 $0 $673,825 $0 $673,825 $694,040
Last Revised: 24-00 - In Progress Total Programmed: $673,825 https://ocfundtracker.octa.net/CIP/report_project_listing 1/7

5/21/24, 8:44 AM
TIP ID
Local Project Number: 15 -OCTA -TSP -3783
Additional Project IDs:

Type of Work: Traffic Signals
Type of Work Description: Traffic Signals -
Coordinate signals within project limits
Limits
Citywide
Project Notes
The project is complete. The City is waiting for the
final close-out of the project by the lead agency,
the City of Fullerton, and OCTA. The funds
budgeted in FY 23/24 are being carryover to FY
24/25.

Last Revised: 24-00 - In Progress
Local Project Number:

Additional Project IDs:

Type of Work: Other
Type of Work Description: Other - Other
Limits
Citywide
Project Notes
Wayfinding signage at key locations throughout a
community helps to create unique community
branding when announcing a motorist's or
pedestrian's arrival at key destinations
Last Revised: 24-00 - In Progress
TIP ID CP -12341
Local Project Number:

Additional Project IDs:

Type of Work: Intersection
Type of Work Description:

Limits
Citywide
Project Notes
Mast Arm -Mounted Street Name Signs.

Intersection - Other
Last Revised: 24-00 - In Progress
TIP ID CP -11662
Local Project Number:

Additional Project IDs:

Type of Work: Road Maintenance
Type of Work Description:

Rehabilitation of roadway
Limits
Citywide
Project Notes
Road Maintenance -
Last Revised: 24-00 - In Progress
ocfundtracker.octa.net/CIP/report project listing
MPLEMENTING AGENCY Placentia, City of
Project Title
Chapman Ave Traffic Signal Synchronization Project
Project Description
Multi -jurisdictional corridor synchronization project.

FISCAL
YEAR
2025

FUND TYPE
Air Quality Management
District

ENG ROW CON/IMP O&M TOTAL ESCAL

ESCALATED
$0 $0 $45,638 $0 $45,638 $47,007
Totals: $0 $0 $45,638 $0 $45,638 $47,007
Total Programmed: $45,638
IMPLEMENTING AGENCY riacentia, City of
Project Title
City General Wayfinding Signage - Phase 1
Project Description
Directional Signs

FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED 2025 General Fund $0 $0 $182,286 $0 $182,286 $187,755
Totals: $0 $0 $182,286 $0 $182,286 $187,755
Total Programmed: $182,286
IMPLEMENTING AGENCY Placentia, City of
Project Title
City Intersection Street Name Sign Replacement (Wayfinding) Project Description
New Street Name Signs

FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED 2025 General Fund $0 $0 $390,203
$0 $390,203 $401,909
Totals: $0 $0 $390,203 $0 $390,203 $401,909
Total Programmed: $390,203
IMPLEMENTING AGENCY Placentia, City of
Project Title
FY 2023-24 Annual Pavement Rehabilitation & Maintenance Program Project Description
Resurfacing of various roadways in FY 23/24
FISCAL
YEAR
2025
2025
2025
2025
2025

FUND TYPE
Measure M2 Local
Fairshare
Developer
General Fund
Other
Gas Tax

ENG ROW CON/IMP O&M TOTAL
$0 $0 $1,203,000 $0
$0 $0 $185,300 $0
$0 $0 $1,423,000 $0
$0 $0 $582,000 $0
$0 $0 $1,497,000 $0
TOTAL

ESCALATED
$1,203,000 $1,239,090
$185,300 $190,859
$1,423,000 $1,465,690
$582,000 $599,460
$1,497,000 $1,541,910
Totals: $0 $0 $4,890,300 $0 $4,890,300 $5,037,009
Total Programmed: $4,890,300
https://ocfundtrackerocta.net/C1P/report_project_listing 2/7

5/21/24, 8:44 AM
TIP ID
Local Project Number:

Additional Project IDs:

Type of Work: Road Maintenance
Type of Work Description:

Rehabilitation of roadway
Limits
Citywide
Project Notes
Currently in design
Road Maintenance -
Last Revised: 24-00 - In Progress

TIP ID CP- - -
Local Project Number:

Additional Project IDs:

Type of Work: Road Maintenance
Type of Work Description:

Rehabilitation of roadway
Limits
Citywide
Project Notes
Road Maintenance -
Last Revised: 24-00 - In Progress
TIP ID CP -11665
Local Project Number:

Additional Project IDs:

Type of Work: Road Maintenance
Type of Work Description:

Reconstruction of roadway
Limits
Citywide
Project Notes
Road Maintenance -
Last Revised: 24-00 - In Progress
ocfundtracker.octa.net/CIP/report project listing
MPLEMENTING AGENCY Placentia, City of
Project Title
FY 2024-25 Annual Pavement Rehabilitation & Maintenance Program - DESIGN Project Description
Road Maintenance - Rehabilitation - resurfacing of various roadways in FY 2024-2025

FISCAL YEAR FUND TYPE ENG
2025 General Fund

ROW CON/IMP O&M TOTAL TOTAL ESCALATED
$150,000 $0 $0 $0 $150,000 $150,000
Totals: $150,000 $0 $0 $0 $150,000 $150,000
Total Programmed: $150,000
MPLEMENTING AGENCY Placentia, City of
Project Title
FY 2025-26 Annual Pavement Rehabilitation & Maintenance Program Project Description
Resurfacing of various roadways in FY 25/26
FISCAL
YEAR
2026 General Fund $0 $0
Measure M2 Local
Fairshare
Local Streets and Roads
apportionments

FUND TYPE

ENG ROW CON/IMP O&M TOTAL
$2,000,000 $0
$0 $0 $500,000 $0
2026
2026
TOTAL

ESCALATED
$2,000,000 $2,121,800
$500,000 $530,450
$0 $0 $900,000 $0 $900,000 $954,810
Totals: $0 $0 $3,400,000 $0 $3,400,000 $3,607,060
Total Programmed: $3,400,000
MPLEMENTING AGENCY Placentia, City of
Project Title
FY 2026-27 Annual Pavement Rehabilitation & Maintenance Program Project Description
Resurfacing of various roadways in FY 26/27
FISCAL
YEAR
2027
2027
2027

FUND TYPE
Local Streets and Roads
apportionments
General Fund
Measure M2 Local
Fairshare

ENG ROW CON/IMP O&M TOTAL ESCALATED
TOTAL
$0 $0 $900,000 $0 $900,000 $983,454
$0 $0 $2,000,000 $0 $2,000,000 $2,185,454
$0 $0 $500,000 $0 $500,000 $546,364
Totals: $0 $0 $3,400,000 $0 $3,400,000 $3,715,272
Total Programmed: $3,400,000
https://ocfundtrackerocta.net/CIP/report_project_listing 3/7

5/21/24, 8:44 AM
TIP ID
Local Project Number:

Additional Project IDs:

Type of Work: Road Maintenance
Type of Work Description:

Reconstruction of roadway
Limits
Citywide
Project Notes
Road Maintenance -
Last Revised: 24-00 - In Progress
TIP ID CP -12368
Local Project Number:

Additional Project IDs:

Type of Work: Road Maintenance
Type of Work Description:

Rehabilitation of roadway
Limits
Citywide
Project Notes
Road Maintenance -
Last Revised: 24-00 - In Progress
TIP ID CP -12343
Local Project Number:

Additional Project IDs:

Type of Work: Safety
Type of Work Description: Safety - Other
Limits
Citywide
Project Notes
As part of the City's current pavement
rehabilitation and maintenance program, a 360 -
degree design philosophy was adopted to
maintain, repair, and improve streets, sidewalks,
and pedestrian and traffic related improvements
within the public right-of-way. The purpose of this
contract is to address broken and damaged
sidewalks, curbs and gutters.

Last Revised: 24-00 - In Progress
ocfundtracker.octa.net/CIP/report project listing
MPLEMENTING AGENCY Placentia, City of
Project Title
FY 2027-28 Annual Pavement Rehabilitation & Maintenance Program Project Description
Resurfacing of various roadways in FY 27/28
FISCAL
YEAR
2028 General Fund
Measure M2 Local
Fairshare
Local Streets and Roads
apportionments

FUND TYPE
2028
2028

ENG ROW CON/IMP O&M TOTAL TOTAL

ESCALATED
$0 $0 $2,000,000 $0 $2,000,000 $2,251,018
$0 $0 $500,000 $0 $500,000 $562,754
$0 $0 $900,000 $0 $900,000 $1,012,958
Totals: $0 $0 $3,400,000 $0 $3,400,000 $3,826,730
Total Programmed: $3,400,000
MPLEMENTING AGENCY Placentia, City of
Project Title
FY 2028-29 Annual Pavement Rehabilitation & Maintenance Program Project Description
Resurfacing of various roadways in FY 28/29
FISCAL
YEAR
2029
2029
2029 General Fund $0 $0 $2,000,000 $0 $2,000,000 $2,318,548 Totals: $0 $0 $3,400,000 $0 $3,400,000 $3,941,532
Total Programmed: $3,400,000
IMPLEMENTING AGENCY Placentia, City of

FUND TYPE
Measure M2 Local
Fairshare
Local Streets and Roads
apportionments

ENG ROW CON/IMP O&M TOTAL
$0 $0 $500,000 $0 $500,000 $579,637
$0 $0 $900,000 $0 $900,000 $1,043,347
TOTAL

ESCALATED
Project Title
FY 24-25 Concrete Repair
Project Description
Concrete Repair Project

FISCAL YEAR FUND TYPE
2025 General Fund
ENG
$0

ROW CON/IMP O&M TOTAL TOTAL ESCALATED
$0 $155,000 $0 $155,000 $159,650
Totals: $0 $0 $155,000 $0 $155,000 $159,650
Total Programmed: $155,000
https://ocfundtrackerocta.net/CIP/report_project_listing 4/7

5/21/24, 8:44 AM
TIP ID
Local Project Number:

Additional Project IDs:

Type of Work: Safety
Type of Work Description: Safety - Seismic
retrofit of bridge
Limits
Golden Avenue bridge structure over the Carbon
Canyon Channel.

Project Notes
Other: HBRRP Federal Bridge Funding This
project is a carryover from FY 21/22. FY 21-22:
"Other Funding - The City received $2.2 million in
federal earmark funding for this project. The funds
budgeted in FY 23/24 are being carryover to FY
24/25.

Last Revised: 24-UU - In Progress
TIP ID CP -11219
Local Project Number: 15-LHAB-TSP-3773
Additional Project IDs:

Type of Work: Traffic Signals
Type of Work Description: Traffic Signals -
Coordinate signals within project limits
Limits
Citywide
Project Notes
This project is complete. The City is awaiting the
final close-out of the project by the lead agency,
the City of La Habra, and OCTA. The funds
budgeted in FY 23/24 are being carryover to FY
24/25.

Last Revised: 24-00 - In Progress
TIP ID CP -10994
Local Project Number: 18 -FULL -TSP -3896
Additional Project IDs: 2002
Type of Work: Traffic Signals
Type of Work Description: Traffic Signals -
Coordinate signals within project limits
Limits
Orangethorpe Avenue from LA/Orange County line
to Esperanza Road in Yorba Linda
Project Notes
This project is led by the City of Fullerton and is a
carryover from FY 20/21. The funds budgeted in
FY 23/24 are being carryover to FY 24/25.

Last Revised: 24-00 - In Progress
ocfundtracker.octa.net/CIP/report project listing
MPLEMENTING AGENCY Placentia, City of
Project Title
Golden Avenue Bridge Design and Rehabilitation
Project Description
The project involves design engineering and permitting for the demolition and replacement of the Golden Avenue bridge over the Carbon Canyon Channel. The project will replace a bridge that is 80 ft. wide with a span of some 75 ft.

FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED 2025 General Fund $0 $0 $2,576,855 $0 $2,576,855 $2,654,161 Totals: $0 $0 $2,576,855 $0 $2,576,855 $2,654,161
Total Programmed: $2,576,855
IMPLEMENTING AGENCY Placentia, City of
Project Title
Imperial Highway Signal Synchronization Project
Project Description
Multi -agency synchronization project led by City of La Habra FISCAL
YEAR
2025

FUND TYPE
Air Quality Management
District

ENG ROW CON/IMP O&M TOTAL TOTAL

ESCALATED
$0 $0 $25,000 $0 $25,000 $25,750
Totals: $0 $0 $25,000 $0 $25,000 $25,750
Total Programmed: $25,000
IMPLEMENTING AGENCY Placentia, City of
Project Title
Orangethorpe Traffic Signal Synchronization Project
Project Description
Synchronization of traffic signals along the Orangethorpe Corridor in Fullerton, Buena Park, Anaheim, Caltrans, Placentia, and Yorba Linda
FISCAL
YEAR
2025
2025
2025

FUND TYPE
Air Quality Management
District
Traffic Impact Fees
Other

ENG ROW CON/IMP O&M TOTAL TOTAL

ESCALATED
$0 $0 $22,000 $0
$0 $0 $8,000 $0
$0 $0 $4,172 $0
$22,000 $22,660
$8,000 $8,240
$4,172 $4,297
Totals: $0 $0 $34,172 $0 $34,172 $35,197
Total Programmed: $34,172
https://ocfundtrackerocta.net/CIP/report_project_listing 5/7

5/21/24, 8:44 AM
TIP ID
Local Project Number:

Additional Project IDs:

Type of Work: Safety
Type of Work Description: Safety - Install guard
rails, curbs or other safety barriers along road
Limits
Citywide
Project Notes
Many communities in the City do not have any
existing ADA curb ramps on sidewalk at each
street corner. Several citizens recently requested
new ADA curb ramps in their community as they
are either disabled or have a disabled family
member. They go around on wheelchairs, and are
currently forced to travel on the street instead of on
the sidewalk due to the lack of ADA curb ramps
Last Revised: 24-UU - In Progress
TIP ID CP -11660
Local Project Number: 2203
Additional Project IDs: 20-ORNG-TSP-3976
Type of Work: Traffic Signals
Type of Work Description: Traffic Signals -
Coordinate signals within project limits
Limits
The Project includes 54 signals over 11.4 miles
along the Tustin Avenue (known as Tustin Street in
the City of Orange) — Rose Drive corridor. Project
limits are from First Street in the City of Tustin
Project Notes
The City of Orange will be the lead and
implementing agency for the Project. Partner
Agencies include the cities of Tustin, Santa Ana,
Anaheim, Placentia and Yorba Linda. The Project
includes 54 signals over 11.4 miles along the
Tustin Avenue (known as Tustin Street in the City
of Orange) — Rose Drive corridor. Project limits are
from First Street in the City of Tustin to Wabash
Avenue in the City of Yorba Linda. The funds
budgeted in FY 23/24 are being carryover to FY
24/25. Additional funds for construction were
included in the FY 24/25 CIP Budget.

Last Revised: 24-00 - In Progress
TIP ID CP -12344
Local Project Number:

Additional Project IDs:

Type of Work: Traffic Signals
Type of Work Description: Traffic Signals -
Coordinate signals within project limits
Limits
Citywide
Project Notes
This traffic impact study for the Packing
House/Transit-Oriented Development Zone (TOD)
and identified future TOD-related traffic operation
deficiencies. The TOD project area at full build -out
will increase residential and commercial densities,
resulting in increased daily vehicular trips that
exceed the operational capacity at several
intersections around the Packing House/TOD area.

The study analyzed twelve (12) signalized
intersections and identified five (5) that will exceed
operational capacity at the project full buildout and
will require mitigation measures.

Last Revised: 24-00 - In Progress
ocfundtracker.octa.net/CIP/report project listing
MPLEMENTING AGENCY Placentia, City of
Project Title
Residential Street Curb Ramps
Project Description
ADA Curb Ramp Construction

FISCAL YEAR
2025

FUND TYPE ENG ROW CON/IMP O&M
Gas Tax $0 $0 $100,000 $0

TOTAL TOTAL ESCALATED
$100,000 $103,000
Totals: $0 $0 $100,000 $0 $100,000 $103,000
Total Programmed: $100,000
IMPLEMENTING AGENCY Placentia, City of
Project Title
Rose/Tustin Regional Traffic Signal Synchronization Project Project Description
Multi -agency synchronization project led by City of Orange FISCAL
YEAR
2025
2025

FUND TYPE
Traffic Impact Fees
Air Quality Management
District

ENG ROW CON/IMP O&M TOTAL
TOTAL

ESCALATED
$0 $0 $100,000 $0 $100,000 $103,000
$0 $0 $53,000 $0 $53,000 $54,590
Totals: $0 $0 $153,000 $0 $153,000 $157,590
Total Programmed: $153,000
IMPLEMENTING AGENCY Placentia, City of
Project Title
TOD Traffic Mitigation Improvement Project
Project Description
Transit Oriented Development Zone -impacting intersections

FISCAL YEAR FUND TYPE ENG ROW CON/IMP
2025 Traffic Impact Fees $0 $0 $300,000

O&M TOTAL TOTAL ESCALATED
$0 $300,000 $309,000
Totals: $0 $0 $300,000 $0 $300,000 $309,000
Total Programmed: $300,000
https://ocfundtrackerocta.net/CIP/report_project_listing 6/7

5/21/24, 8:44 AM
TIP ID
Local Project Number:

Additional Project IDs:

Type of Work: Traffic Signals
Type of Work Description: Traffic Signals - Install
new traffic signals and equipment
Limits
Citywide
Project Notes
Every year, people suffer injury or death resulting
from intersection related crashes when traffic
signals are not functioning. These outages,
typically due to the failure of the aging, stressed
US grid, are not going to improve any time soon.

Providing backup power for signals and ITS
equipment can keep the power on and intersection
safe.

Last Revised: 24-UU - In Progress
TIP ID CP -12369
Local Project Number:

Additional Project IDs:

Type of Work: Safety
Type of Work Description: Safety - Signage
installation and/or replacement
Limits
Citywide
Project Notes
Last Revised: 24-00 - In Progress
TIP ID CP -12338
Local Project Number:

Additional Project IDs:

Type of Work: Aesthetics
Type of Work Description:

Landscaping of roadway
Limits
Citywide
Project Notes
Median Lane Renovation Project.

Aesthetics -
Last Revised: 24-00 - In Progress
TIP ID CP -12363
Local Project Number:

Additional Project IDs:

Type of Work: Traffic Signals
Type of Work Description: Traffic Signals -
Coordinate signals within project limits
Limits
Citywide
Project Notes
Upgrading communication will provide for greater
system reliability. Signal timing will improve traffic
flow and minimize stops and delays. Provide
operational and infrastructure improvements along
Yorba Linda Boulevard between State College
Blvd and Oak Canyon Drive. This is a
multijurisdictional project led by the City of Yorba
Linda and also including the cities of Anaheim and
Fullerton.

Last Revised: 24-uu - In Nrogress
ocfundtracker.octa.net/CIP/report project listing
MPLEMENTING AGENCY Placentia, City of
Project Title
Traffic Signal Back -Up Batteries
Project Description
Batteries

FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED 2025 Traffic Impact Fees $0 $0 $10,000 $0 $10,000 $10,300 Totals: $0 $0 $10,000 $0 $10,000 $10,300
Total Programmed: $10,000
IMPLEMENTING AGENCY Placentia, City of
Project Title
Wayfinding Signs - Residential Street Name Sign Replacements Project Description
Installation of residential street name signs

FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED 2025 General Fund $0 $0 $250,000 $0 $250,000 $257,500
Totals: $0 $0 $250,000 $0 $250,000 $257,500
Total Programmed: $250,000
IMPLEMENTING AGENCY Placentia, City of
Project Title
Yorba Linda Blvd. Landscaped Median Renovation Project
Project Description
Median Lane Renovation

FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED 2025 General Fund $0 $0 $42,019 $0 $42,019 $43,280
Totals: $0 $0 $42,019 $0 $42,019 $43,280
Total Programmed: $42,019
IMPLEMENTING AGENCY Placentia, City of
Project Title
Yorba Linda Boulevard TSSP
Project Description
Traffic Signal Synchronization Program
FISCAL
YEAR
2025
2025

FUND TYPE
Traffic Signal Sync Program
(TSSP)
Air Quality Management
District

ENG ROW CON/IMP O&M TOTAL TOTAL

ESCALATED
$0 $0 $105,001 $0 $105,001 $108,151
$0 $0 $60,000 $0 $60,000 $61,800
Totals: $0 $0 $165,001 $0 $165,001 $169,951
Total Programmed: $165,001
https://ocfundtrackerocta.net/CIP/report_project_listing 7/7