1.F PSA FOR ATWOOD MULTIPURPOSE TRAIL PROJECT & RES NO. R-2025-02 STATE & FEDERAL AGMTS FOR TRANSPORTATION PROJECTS

Placentia City Council
January 14, 2025

Document
1.F PSA FOR ATWOOD MULTIPURPOSE TRAIL PROJECT & RES NO. R-2025-02 STATE & FEDERAL AGMTS FOR TRANSPORTATION PROJECTS
Meeting
January 14, 2025
Body
Placentia City Council
Pages
2
Original file
28 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

Agenda Item No: 1.f

PLACENTIA CITY COUNCIL AGENDA REPORT
Meeting Date: January 14, 2025
Submitted by: Elsa Robinson
From: Public Works
Subject:

Program Supplement Agreement for Atwood Multipurpose Trail Project and Resolution Authorizing City Administrator to Execute State and Federal Agreements for Transportation Projects Between Caltrans and City of Placentia
Financial Impact:

Fiscal Impact:

There is no direct fiscal impact associated with this recommended action.

Summary:

On February 12, 2024, the Orange County Transportation Authority (OCTA) Board of Directors (Board) approved the 2023 Orange County Complete Streets Program (OCCSP) Project Prioritization Recommendations and awarded the City a total of $2,753,000 funding for the Atwood Multipurpose Trail Project (Project). This funding is to complete the preliminary design and construction of the Project. The California Department of Transportation (Caltrans) is the agency tasked with overseeing the administration of Federal transportation grant funds throughout the State. In order for the City to be able to obligate the funds and receive reimbursement, a Program Supplement Agreement (PSA) is needed to amend the master agreement between the State and the City of Placentia allocating $272,000 of the $2,753,000 in grant funding awarded to the City for project engineering design services. Caltrans also requires an authorizing resolution adopted by the City Council in order to obligate funds for grant funding.

Recommendation:

Recommended Action : It is recommended that the City Council:

1. Approve Program Supplement Agreement No. F015 Rev. 01 with the California Department of Transportation; and

2. Approve Resolution R-2025-02, a Resolution of the City Council of the City of Placentia, California authorizing the City Administrator or his/her designee to execute Program Supplement Agreement No. F015 and all state and federal agreements for transportation grant funded projects with the California Department of Transportation; and

3. Authorize the City Administrator to execute all necessary documents, in a form approved by the City Attorney.
1 Strategic Plan Statement:

This item is consistent with the City Council approved 5-Year Strategic Goal #1 to ensure long-term fiscal sustainability, under Objective #1.2, which is to continue efforts to seek and obtain new sources of state and federal grants, including federal and state earmarks and Biden Infrastructure Package.

Discussion:

On February 12, 2024, the Orange County Transportation Authority (OCTA) Board of Directors (Board) approved the 2023 Orange County Complete Streets Program (OCCSP) Project Prioritization Recommendations and awarded the City a total of $2,753,000 funding for the Atwood Multipurpose Trail Project (Project). This funding is comprised of $272,000 in Congestion Mitigation and Air Quality Improvement (CMAQ) funds to complete the Preliminary Engineering phase of the Project and $2,481,000 in Surface Transportation Block Grant (STBG) for the Construction phase. These funds are administered through Caltrans. In November 2024, the City received authorization to move forward with completion of the Preliminary Engineering phase of the project. In order for the City to be able to obligate the funds and receive reimbursement, the City must execute a Program Supplement Agreement (PSA) with Caltrans (Attachment 1).

Caltrans is the agency tasked with overseeing the administration of Federal transportation grant funds throughout the State. The use of these funds requires the execution of program supplement agreements between Caltrans and local agencies. These agreements outline how the funds are to be used, identifies eligible expenses and accounting requirements. The attached PSA allocates a total of $272,000 of the $2,753,000 grant for engineering design services. A separate agreement will be required in the future for the construction and construction management/inspection dollars allocated to the Project. As such, Staff is recommending approval of PSA No. F015 between Caltrans and the City of Placentia.

Caltrans also requires an authorizing resolution adopted by the City Council in order to obligate funds for grant funding. Staff is currently required to seek Council approval for a resolution on each individual project, even if the City Council has already authorized the receipt and expenditure of the funding during the annual budget adoption process. The attached resolution (Attachment 2) authorizes the City Administrator or Director of Public Works/City Engineer, or his/her designee to execute all Master Agreements, Program Supplemental Agreements, Fund Exchange Agreements, Fund Transfer Agreements and any amendments, thereto, with Caltrans. This resolution would also apply to any future Caltrans- funded projects. Staff is recommending adoption of Resolution No. 2025-02 to expedite this process. By authorizing the City Administrator to execute these agreements and any related amendments in advance, Staff will be able to:

Accelerate the availability of funds
Speed up the approval process for the design phase with Caltrans Streamline the approval process for the bidding and construction phases with Caltrans Decrease the time spent on preparing staff reports .

Fiscal Impact Summary:

There are no direct costs associated with the recommended actions. The estimated cost for the engineering design phase of the Atwood Multipurpose Project is $310,000 and funds have been included in the adopted Fiscal Year (FY) 2024-25 Capital Improvement Program (CIP) Budget. The construction phase of the project is scheduled to be programmed in FY 2025-26 2 once the City has completed the engineering design phase and received authorization to move forward with construction. Any future grant funds will be presented to the City Council for approval and allocation in the City’s CIP Budget.

Attachments
Attachment 1 - Program Supplement Agreement No. F015
Attachment 2 - Resolution No. 2025-02.pdf
3 F015 Rev. 1
FOR FEDERAL-AID PROJECTS NO 12-5269F15
1220000066
December 02, 2024
12-ORA-0-PLCN
CML-5269(029)
5269
This Program Supplement hereby adopts and incorporates the Administering Agency-State Agreement for Federal Aid which was entered into between the Administering Agency and the State on 01/25/2017 and is subject to all the terms and conditions thereof. This Program Supplement is executed in accordance with Article I of the aforementioned Master Agreement under authority of Resolution No. approved by the Administering Agency on (See copy attached).

The Administering Agency further stipulates that as a condition to the payment by the State of any funds derived from sources noted below obligated to this PROJECT, the Administering Agency accepts and will comply with the special covenants or remarks set forth on the following pages.

Atwood Flood Channel South of Orangethorpe Ave. between Jefferson St. and Lakeview Ave.

Multipurpose Trail including pedestrian / bike trail, ADA, & landscaping

0.6(MILES)
Federal FundsEstimated Cost Matching Funds
Z400 $280,000.00
L40E $272,000.00

CITY OF PLACENTIA
By ________________________________By ________________________________ Title _______________________________
Date _______________________________
Attest _______________________________Date _______________________________ Division of Local Assistance
I hereby certify upon my personal knowledge that budgeted funds are available for this encumbrance:

Accounting Officer _______________________Date _______________ PROGRAM SUPPLEMENT NO.
to

ADMINISTERING AGENCY-STATE AGREEMENT
Adv. Project ID Date:

Location:

Project Number:

E.A. Number:

Locode:

PROJECT LOCATION:

TYPE OF WORK:LENGTH:

LOCAL OTHER
$660,000.00 $108,000.00 $0.00
Chief, Office of Project Management Oversight

STATE OF CALIFORNIA
Department of Transportation
$552,000.00
1Page of 7Program Supplement 12-5269F15-F015-R1-
12/2/24
4 SPECIAL COVENANTS OR REMARKS
12-ORA-0-PLCN
CML-5269(029)

1.A. The ADMINISTERING AGENCY will advertise, award and administer this project in accordance with the current published Local Assistance Procedures Manual.

B. ADMINISTERING AGENCY agrees that it will only proceed with work authorized for specific phase(s) with an "Authorization to Proceed" and will not proceed with future phase(s) of this project prior to receiving an "Authorization to Proceed" from the STATE for that phase(s) unless no further State or Federal funds are needed for those future phase(s).

C. STATE and ADMINISTERING AGENCY agree that any additional funds which might be made available by future Federal obligations will be encumbered on this PROJECT by use of a STATE-approved "Authorization to Proceed" and Finance Letter. ADMINISTERING AGENCY agrees that Federal funds available for reimbursement will be limited to the amounts obligated by the Federal Highway Administration.

D. Award information shall be submitted by the ADMINISTERING AGENCY to the District Local Assistance Engineer within 60 days of project contract award and prior to the submittal of the ADMINISTERING AGENCY'S first invoice for the construction contract.

Failure to do so will cause a delay in the State processing invoices for the construction phase.

Attention is directed to Section 15.6 "Award Package" of the Local Assistance Procedures Manual.

E. ADMINISTERING AGENCY agrees, as a minimum, to submit invoices at least once every six months commencing after the funds are encumbered for each phase by the execution of this Project Program Supplement Agreement, or by STATE's approval of an applicable Finance Letter. STATE reserves the right to suspend future authorizations/obligations for Federal aid projects, or encumbrances for State funded projects, as well as to suspend invoice payments for any on-going or future project by ADMINISTERING AGENCY if PROJECT costs have not been invoiced by ADMINISTERING AGENCY for a six-month period.

If no costs have been invoiced for a six-month period, ADMINISTERING AGENCY agrees to submit for each phase a written explanation of the absence of PROJECT activity along with target billing date and target billing amount.

ADMINISTERING AGENCY agrees to submit the final report documents that collectively constitute a "Report of Expenditures" within one hundred eighty (180) days of PROJECT completion. Failure of ADMINISTERING AGENCY to submit a "Final Report of Expenditures" within 180 days of PROJECT completion will result in STATE imposing sanctions upon ADMINISTERING AGENCY in accordance with the current Local Assistance Procedures Manual.
2Page of 7Program Supplement 12-5269F15-F015-R1-
5 SPECIAL COVENANTS OR REMARKS
12-ORA-0-PLCN
CML-5269(029)
F. Administering Agency shall not discriminate on the basis of race, religion, age, disability, color, national origin, or sex in the award and performance of any Federal-assisted contract or in the administration of its DBE Program Implementation Agreement. The Administering Agency shall take all necessary and reasonable steps under 49 CFR Part 26 to ensure nondiscrimination in the award and administration of Federal-assisted contracts. The Administering Agency's DBE Implementation Agreement is incorporated by reference in this Agreement. Implementation of the DBE Implementation Agreement, including but not limited to timely reporting of DBE commitments and utilization, is a legal obligation and failure to carry out its terms shall be treated as a violation of this Agreement. Upon notification to the Administering Agency of its failure to carry out its DBE Implementation Agreement, the State may impose sanctions as provided for under 49 CFR Part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801 et seq.).

G. Any State and Federal funds that may have been encumbered for this project are available for disbursement for limited periods of time. For each fund encumbrance the limited period is from the start of the fiscal year that the specific fund was appropriated within the State Budget Act to the applicable fund Reversion Date shown on the State approved project finance letter. Per Government Code Section 16304, all project funds not liquidated within these periods will revert unless an executed Cooperative Work Agreement extending these dates is requested by the ADMINISTERING AGENCY and approved by the California Department of Finance.

ADMINISTERING AGENCY should ensure that invoices are submitted to the District Local Assistance Engineer at least 75 days prior to the applicable fund Reversion Date to avoid the lapse of applicable funds. Pursuant to a directive from the State Controller's Office and the Department of Finance; in order for payment to be made, the last date the District Local Assistance Engineer can forward an invoice for payment to the Department's Local Programs Accounting Office for reimbursable work for funds that are going to revert at the end of a particular fiscal year is May 15th of the particular fiscal year. Notwithstanding the unliquidated sums of project specific State and Federal funding remaining and available to fund project work, any invoice for reimbursement involving applicable funds that is not received by the Department's Local Programs Accounting Office at least 45 days prior to the applicable fixed fund Reversion Date will not be paid. These unexpended funds will be irrevocably reverted by the Department's Division of Accounting on the applicable fund Reversion Date.

H. As a condition for receiving federal-aid highway funds for the PROJECT, the Administering Agency certifies that NO members of the elected board, council, or other key decision makers are on the Federal Government Exclusion List. Exclusions can be found at www.sam.gov . 3Page of 7Program Supplement 12-5269F15-F015-R1-
6 SPECIAL COVENANTS OR REMARKS
12-ORA-0-PLCN
CML-5269(029)

2.A. ADMINISTERING AGENCY shall conform to all State statutes, regulations and procedures (including those set forth in the Local Assistance Procedures Manual and the Local Assistance Program Guidelines, hereafter collectively referred to as "LOCAL ASSISTANCE PROCEDURES") relating to the federal-aid program, all Title 23 Code of Federal Regulation (CFR) and 2 CFR Part 200 federal requirements, and all applicable federal laws, regulations, and policy and procedural or instructional memoranda, unless otherwise specifically waived as designated in the executed project-specific PROGRAM SUPPLEMENT.

B. Invoices shall be formatted in accordance with LOCAL ASSISTANCE PROCEDURES.

C. ADMINISTERING AGENCY must have at least one copy of supporting backup documentation for costs incurred and claimed for reimbursement by ADMINISTERING AGENCY. ADMINISTERING AGENCY agrees to submit supporting backup documentation with invoices if requested by State. Acceptable backup documentation includes, but is not limited to, agency's progress payment to the contractors, copies of cancelled checks showing amounts made payable to vendors and contractors, and/or a computerized summary of PROJECT costs.

D. Indirect Cost Allocation Plan/Indirect Cost Rate Proposals (ICAP/ICRP), Central Service Cost Allocation Plans and related documentation are to be prepared and provided to STATE (Caltrans Audits & Investigations) for review and approval prior to ADMINISTERING AGENCY seeking reimbursement of indirect costs incurred within each fiscal year being claimed for State and federal reimbursement. ICAPs/ICRPs must be prepared in accordance with the requirements set forth in 2 CFR, Part 200, Chapter 5 of the Local Assistance Procedural Manual, and the ICAP/ICRP approval procedures established by STATE.

E. STATE will withhold the greater of either two (2) percent of the total of all federal funds encumbered for each PROGRAM SUPPLEMENT or $40,000 until ADMINISTERING AGENCY submits the Final Report of Expenditures for each completed PROGRAM SUPPLEMENT PROJECT.

F. Payments to ADMINISTERING AGENCY for PROJECT-related travel and subsistence (per diem) expenses of ADMINISTERING AGENCY forces and its contractors and subcontractors claimed for reimbursement or as local match credit shall not exceed rates authorized to be paid rank and file STATE employees under current State Department of Personnel Administration (DPA) rules. If the rates invoiced by ADMINISTERING AGENCY are in excess of DPA rates, ADMINISTERING AGENCY is responsible for the cost difference, and any overpayments inadvertently paid by STATE shall be reimbursed to STATE by ADMINISTERING AGENCY on demand within thirty (30) days of such invoice. 4Page of 7Program Supplement 12-5269F15-F015-R1-
7 SPECIAL COVENANTS OR REMARKS
12-ORA-0-PLCN
CML-5269(029)
G. ADMINISTERING AGENCY agrees to comply with 2 CFR, Part 200, Uniform Administrative Requirements, Cost Principles and Audit Requirement for Federal Awards.

H. ADMINISTERING AGENCY agrees, and will assure that its contractors and subcontractors will be obligated to agree, that Contract Cost Principles and Procedures, 48 CFR, Federal Acquisition Regulations System, Chapter 1, Part 31, et seq., shall be used to determine the allowability of individual PROJECT cost items.

I. Every sub-recipient receiving PROJECT funds under this AGREEMENT shall comply with 2 CFR, Part 200, 23 CFR, 48 CFR Chapter 1, Part 31, Local Assistance Procedures, Public Contract Code (PCC) 10300-10334 (procurement of goods), PCC 10335-10381 (non-A&E services), and other applicable STATE and FEDERAL regulations.

J. Any PROJECT costs for which ADMINISTERING AGENCY has received payment or credit that are determined by subsequent audit to be unallowable under 2 CFR, Part 200, 23 CFR, 48 CFR, Chapter 1, Part 31, and other applicable STATE and FEDERAL regulations, are subject to repayment by ADMINISTERING AGENCY to STATE.

K. STATE reserves the right to conduct technical and financial audits of PROJECT WORK and records and ADMINISTERING AGENCY agrees, and shall require its contractors and subcontractors to agree, to cooperate with STATE by making all appropriate and relevant PROJECT records available for audit and copying as required by the following paragraph:

ADMINISTERING AGENCY, ADMINISTERING AGENCY'S contractors and subcontractors, and STATE shall each maintain and make available for inspection and audit by STATE, the California State Auditor, or any duly authorized representative of STATE or the United States all books, documents, papers, accounting records, and other evidence pertaining to the performance of such contracts, including, but not limited to, the costs of administering those various contracts and ADMINISTERING AGENCY shall furnish copies thereof if requested.

All of the above referenced parties shall make such AGREEMENT, PROGRAM SUPPLEMENT, and contract materials available at their respective offices at all reasonable times during the entire PROJECT period and for three (3) years from the date of submission of the final expenditure report by the STATE to the FHWA.

L. ADMINISTERING AGENCY, its contractors and subcontractors shall establish and maintain a financial management system and records that properly accumulate and segregate reasonable, allowable, and allocable incurred PROJECT costs and matching funds by line item for the PROJECT. The financial management system
5Page of 7Program Supplement 12-5269F15-F015-R1-
8 SPECIAL COVENANTS OR REMARKS
12-ORA-0-PLCN
CML-5269(029)
of ADMINISTERING AGENCY, its contractors and all subcontractors shall conform to Generally Accepted Accounting Principles, enable the determination of incurred costs at interim points of completion, and provide support for reimbursement payment vouchers or invoices set to or paid by STATE.

M. ADMINISTERING AGENCY is required to have an audit in accordance with the Single Audit Act of 2 CFR 200 if it expends $750,000 or more in Federal Funds in a single fiscal year of the Catalogue of Federal Domestic Assistance.

N. ADMINISTERING AGENCY agrees to include all PROGRAM SUPPLEMENTS adopting the terms of this AGREEMENT in the schedule of projects to be examined in ADMINISTERING AGENCY's annual audit and in the schedule of projects to be examined under its single audit prepared in accordance with 2 CFR, Part 200.

O. ADMINISTERING AGENCY shall not award a non-A&E contract over $5,000, construction contracts over $10,000, or other contracts over $25,000 [excluding professional service contracts of the type which are required to be procured in accordance with Government Code sections 4525 (d), (e) and (f)] on the basis of a noncompetitive negotiation for work to be performed under this AGREEMENT without the prior written approval of STATE. Contracts awarded by ADMINISTERING AGENCY, if intended as local match credit, must meet the requirements set forth in this AGREEMENT regarding local match funds.

P. Any subcontract entered into by ADMINISTERING AGENCY as a result of this AGREEMENT shall contain provisions B, C, F, H, I, K, and L under Section 2 of this agreement.

4.Appendix E of the Title VI Assurances (US DOT Order 1050.2A) During the performance of this agreement, the ADMINISTERING AGENCY, ADMINISTERING AGENCY'S contractors and subcontractor, (hereinafter referred to as the "contractor") agrees to comply with the following nondiscrimination statutes and authorities; including but not limited to:

Pertinent Nondiscrimination Authorities:

A. Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21.

B. The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); C. Federal-Aid Highway Act of 1973, (23 U.S.C. 324 et seq.), (prohibits discrimination on the basis of sex);
D. Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. 794 et seq.), as 6Page of 7Program Supplement 12-5269F15-F015-R1-
9 SPECIAL COVENANTS OR REMARKS
12-ORA-0-PLCN
CML-5269(029)
amended, (prohibits discrimination on the basis of disability); and 49 CFR Part 27; E. The Age Discrimination Act of 1975, as amended, (42 U.S.C. 6101 et seq.), (prohibits discrimination on the basis of age);
F. Airport and Airway Improvement Act of 1982, (49 U.S.C. 4 71, Section 4 7123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); G. The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or
activities" to include all of the programs or activities of the Federal-aid recipients, subrecipients and contractors, whether such programs or activities are Federally funded or not);
H. Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. 12131-12189) as implemented by Department of Transportation regulations at 49 C.F.R. parts 37 and 38; I. The Federal Aviation Administration's Nondiscrimination statute (49 U.S.C. 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); J. Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures nondiscrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations; K. Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100);
L. Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq).

5.In the event that construction of this project of the initial federal authorization for right of way is not started by the close of the twentieth fiscal year following the fiscal year in which the right of way is authorized, the ADMINISTERING AGENCY shall repay the Federal Highway Administration through Caltrans the sum of Federal funds paid under the terms of this agreement.

Authorizing the ROW phase of a project as Advance Construction does not exempt the project from the provisions of 23 U.S.C. 108(a)(2), and 23 CFR 630.112(c)(1). 7Page of 7Program Supplement 12-5269F15-F015-R1-
10 Resolution R-2025-02

Page 1 of 2 ends

RESOLUTION NO. R-2025-02

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF PLACENTIA, CALIFORNIA AUTHORIZING THE CITY

ADMINISTRATOR AND DIRECTOR OF PUBLIC WORKS,

OR HIS/HER DESIGNEE TO EXECUTE MASTER

AGREEMENTS, PROGRAM SUPPLEMENTAL

AGREEMENTS, FUND EXCHANGE AGREEMENTS,

FUND TRANSFER AGREEMENTS BETWEEN THE STATE

OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION
(CALTRANS) AND THE CITY OF PLACENTIA FOR

FEDERAL-AID PROJECTS AND STATE-FUNDED

PROJECTS
A.Recitals
(i). The City of Placentia is eligible to receive Federal and/or State funding for certain Transportation Projects, through the California Department of Transportation (Caltrans); and.
(ii). Master Agreements, Program Supplemental Agreements, Fund Exchange Agreements and/or Fund Transfer Agreements need to be executed with the California Department of Transportation before such funds could be claimed; and (iii). Caltrans requires Program Supplemental Agreements to be executed for the administration of federal grant funds received; and
(iv). The City of Placentia wishes to delegate authorization to execute Program Supplement Agreement No. F015 to Administering Agency-State Agreement No. 12- 5269F15, all future agreements and any amendments thereto to the City Administrator, Director of Public Works/City Engineer or his/her designee.

B.Resolution

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PLACENTIA DOES HEREBY FIND, DETERMINE AND RESOLVE AS FOLLOWS:

1.In all respects as set forth in the Recitals, Part A., above.

2.The Placentia City Council hereby authorizes the City Administrator, Director of Public Works/City Engineer or his/her designee to execute all Master Agreements, Program Supplemental Agreements, Fund Exchange Agreements, Fund Transfer Agreements and any amendments thereto with California Department of Transportation.

ATTACHMENT 2 11

Resolution R-2025-02

Page 2 of 2 ends

APPROVED and ADOPTED this 14th day of January 2025.
___________________________ Kevin Kirwin, Mayor
ATTEST:
___________________________
Robert S. McKinnell, City Clerk

STATE OF CALIFORNIA

COUNTY OF ORANGE
I, Robert S. McKinnell, City Clerk of the City Of Placentia do hereby certify that the foregoing Resolution was adopted at a regular meeting of the City Council held on the 14th day of January 2025 by the following vote:

AYES: Councilmembers:

NOES: Councilmembers:

ABSENT: Councilmembers:

ABSTAIN: Councilmembers:
______________________________
Robert S. McKinnell, City Clerk
APPROVED AS TO FORM:
________________________________ Christian L. Bettenhausen, City Attorney ATTACHMENT 2 12