Agenda Item No: 1.j
PLACENTIA CITY COUNCIL AGENDA REPORT
Meeting Date: September 8, 2026
Submitted by: Gabriel Guerrero-Gabany
From: Public Works
Subject:
AMENDMENT NO. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH T.Y. LIN
INTERNATIONAL, FOR CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES RELATED TO THE GOLDEN AVENUE BRIDGE PROJECT NO. 1801
Financial Impact:
Additional
Expense:
Available Budaet:
$ 302,848.00
$6.375.873.55
$2,200,000.00
$2,647,046.00
$ 215,682.00
$1,313,145.55
Construction Management and Inspection
Total Proiect Budaet
Community Project Funding/Congressionally Directed
Spending (CPFCDS) (505-90300-9600)
Highway Bridge Program (HBP) (224-90400-9600)
County of Orange OC Loop Segment D Contribution
Measure U (including required City Federal
Match)(102-90300-9600)
Summary:
On November 18, 2025, City Council awarded a construction contract for the reconstruction of the Golden Avenue Bridge. The bridge is located along Golden Avenue, West of Imperial Highway and East of Valencia Avenue. The total project cost was $6,037,599.55 which funds the construction, contingency, construction management and inspection, and construction engineering support from the design firm. The cost breakdown consists of $2,647,046 of Federal Highway Bridge Program funds, $2,200,000 of Community Project Funding/Congressionally Directed Spending, $215,682 of County of Orange contribution for OC Loop D construction, and $974,871.55 of Measure U funds. As a part of this action on November 18, 2025, Council also approved a professional services agreement with T.Y. Lin International for professional construction management and inspection services in the amount of $713,091.
The project has encountered a delay caused by utility coordination work outside of the contractor's direct scope of work. While a majority of the utility providers were able to complete their work within provided construction windows, Southern California Edison (SCE) was not.
Staff determined that the undergrounding work is essential to the overall scope of work for the project, satisfies previous agreements entered into between the City and the Brandywine community, and will result in the ideal finished product. 1 To avoid the potential delay in coordinating with SCE forces, the City directed their contractor to pick up the undergrounding scope in an effort to recover as much of the original schedule as possible. The additional utility coordination efforts on behalf of the construction team and additional utility work on behalf of the contractor resulted in an additional three months of contract time to the originally anticipated six -months. This additional work requires continued oversight from the construction management and inspection team. Approving this amendment will ensure that the City continues to receive the essential support it needs to successfully deliver the project.
Staff requests City Council approve Amendment No.1 to the contract with T.Y. Lin in the amount of $302,848 to provide for additional construction management and inspection support for the remainder of the project. This would increase the construction management and inspection support from the originally approved amount of $713,091 to $1,015,939.
Recommended Action:
It is recommended that the City Council:
1. Approve Amendment No. 1 to the Professional Services Agreement with T.Y. Lin International, for an additional $302,848, to provide additional professional construction management and inspection services for the Golden Avenue Bridge Project for a cumulative contract not -to -exceed amount of $1,015,939; and
2. Authorize the Acting City Administrator and/or her designee to execute the necessary documents, in a form approved by the City Attorney.
Strategic Plan Statement:
This item is not directly related to a specific strategic plan goal.
Discussion:
The City of Placentia has budgeted in its Capital Improvement Program to replace the Golden Avenue Bridge and the related portion of the OC Bikeway Loop Segment D. The bridge is located along Golden Avenue west of Imperial Highway and East of Valencia Avenue. Golden Avenue is a regionally significant collector roadway, providing east -west travel between the cities of Placentia and Yorba Linda. The bridge was built in 1934 to span the Carbon Canyon Channel and was rated functionally obsolete in 2005 by Caltrans.
The existing bridge was an earth -filled reinforced concrete arch bridge supported on spread footings. The bridge was 34 feet long and 27 feet wide and carried two lanes of traffic over the channel. There were no sidewalks or bicycle lanes on the bridge resulting in potential conflicts between pedestrians, bicyclists, and motorists.
The proposed bridge will be a 60 -foot -4 -inch wide structure designed to improve safety, mobility, and connectivity. The bridge will provide two 12 -foot -wide travel lanes and 6 -foot -wide sidewalks on both the south and north sides of the structure. The superstructure will consist of PC/PS CA 154 girders and will incorporate a Type 732SW (Modified) barrier to meet current safety standards. It is also designed to accommodate six telecommunications conduits, a 4 - inch So Cal Gas line, six conduits for Southern California Edison (SCE), and a 16 -inch casing for a future Yorba Linda Water District waterline. The substructure will be composed of abutments with a thickness of 3.5 feet, supported on 2.5 feet CIDH piles. In addition, the project will also complete 800 feet of Orange County Public Works' bike/pedestrian trail project, OC Loop Segment D, from Station 21+00 to 29+00, which runs directly under the 2 bridge, providing a link for regional trail connectivity.
On November 18, 2025, City Council awarded a construction contract for the reconstruction of the Golden Avenue Bridge. The total project cost was $6,037,599.55 which funds the construction, contingency, construction management and inspection, and construction engineering support from the design firm. The cost breakdown consists of $2,647,046 of Federal Highway Bridge Program funds, $2,200,000 of Community Project Funding/Congressionally Directed Spending, $215,682 of County of Orange contribution for OC Loop D construction, and $974,871.55 of Measure U funds. As a part of this action on November 18, 2025, Council also approved a professional services agreement with T.Y. Lin International for professional construction management and inspection services in the amount of $713,091.
The project has encountered a delay caused by utility coordination work outside of the contractor's direct scope of work. Eleven separate utility providers are affected by the reconstruction of the bridge. All these providers were notified during the design phase regarding upcoming work to ensure the design plans were consistent with their requirements.
During this time, scopes and responsibilities were also assigned regarding who would be responsible for each relocation effort. Once construction began, a construction window was provided to the separate utility agencies during which they would be provided access to the job site by the City's contractor to perform their required work. While a majority of the utility providers were able to meet their provided construction windows, Southern California Edison (SCE) was not. SCE provided an updated cost for them to perform their work weeks before the anticipated work was scheduled to begin. The amount provided was well above what had previously been provided to the City. This required the City to reevaluate the priority of SCE's undergrounding work and coordinate with the City contractor to see if the scope could be covered by them. Staff determined that the undergrounding effort is essential to the overall scope of work for the project, satisfies previous agreements entered into between the City and the Brandywine community, and will result in the ideal finished product.
To avoid the potential delay in coordinating with SCE forces, the City directed their contractor to pick up the undergrounding scope in an effort to recover as much of the original schedule as possible. The additional utility coordination efforts on behalf of the construction team and additional utility work on behalf of the contractor resulted in an additional three months of contract time to the originally anticipated six -months. This additional work requires continued oversight from the construction management and inspection team. Approving this amendment will ensure that the City continues to receive the essential support it needs to successfully deliver the project.
Staff requests City Council approve Amendment No.1 to the contract with T.Y. Lin in the amount of $302,848 to provide for additional construction management and inspection support for the remainder of the project. This would increase the construction management and inspection support from the originally approved amount of $713,091 to $1,015,939.
Financial Summary:
The revised total construction cost for the Golden Avenue Bridge Replacement Project would amount to $6,375,873.55. This cost consists of the bid amount submitted by CT&T Concrete Paving Inc. in the amount of $4,687,010.50, a construction contingency in the amount of $468,701.05, revised construction management and inspection services with T.Y. Lin in the amount of $1,015,939, and revised construction engineering support services with BCA in the 3 amount of $204,223.
Funding for this project is supported by numerous sources as outlined below:
Funding Source Amount Account(s)
FY 25/26 Misc. Grants and
Contributions $5,062,728.00 505-90300-9600, 224-90400-9600 FY 25/26 Measure U Funds $1.313.145.55 102-90300-9600
Total $6,375,873.55
Attachments
Attachment 1 - TY LIN PSA_Amendment No.1.pdf
Attachment 2 - TY LIN PSA.pdf
4 AMENDMENT NO. 1 TO
PROFESSIONAL SERVICES AGREEMENT
WITH T.Y. LIN INTERNATIONAL
This Amendment No. 1 ("Amendment") to Professional Services Agreement is made and entered into effective the 1ST day of September, 2026, by and between the CITY OF PLACENTIA, a Charter City and Municipal Corporation ("CITY"), and T.Y. Lin International, a California corporation (hereinafter "CONSULTANT"). CITY and CONSULTANT are sometimes hereinafter individually referred to as "Party" and or collectively referred to as the "Parties." A. Recitals.
(i) CITY and CONSULTANT entered into a Professional Services Agreement ("Agreement") effective November 18, 2025 through which CONSULTANT has been providing professional services as more fully explained in the Scope of Services attached to the Agreement as Exhibit "A".
(ii) The Parties now seek to amend the Agreement to increase the compensation by $302,848 for additional work related to construction management and inspection services for the Golden Avenue Bridge Replacement Project. Including previously approved additional service requests, the total not to exceed amount is $1,015,939 . (iii) All legal prerequisites to the making of this Amendment have occurred.
NOW, THEREFORE, in consideration of the mutual covenants and conditions set forth herein, the Parties agree as follows:
B. Amendment to Agreement.
1. Section 2.1, Paragraph 1 of the Agreement is hereby amended to read as follows:
Compensation. Consultant shall be paid in accordance with the fee schedule set forth in Exhibit "A". Consultant's total compensation shall not exceed one million fifteen thousand nine hundred and thirty-nine dollars ($1,015,939).
2. Except as specifically modified herein, all of the terms, conditions and provisions of the Agreement shall remain in full force and effect.
3. The Agreement, all amendments together with this Amendment No. 1 and all Exhibits attached thereto, constitutes the entire Agreement between the Parties and supersedes all prior negotiations, arrangements, representations, and understandings, if any, made by or between the Parties with respect to the subject matter hereof. No amendment or other modification of the Agreement, as modified by this Amendment No. 1 shall be binding unless executed in writing by both Parties hereto, or their respective successors, assigns, or grantees.
4. Each of the undersigned represents and warrants that he or she is duly authorized to execute and deliver this Amendment No. 1 and that such execution is binding upon the entity for which he or she is executing this document.
IN WITNESS WHEREOF, the Parties have caused Amendment No. 1 to the Consulting Services Agreement are to be executed as of the day and year first above written.
5 CONSULTANT CITY OF PLACENTIA
)ei
By: By:
Joseph Smith Rosanna Ramirez
Vice President Interim City Administrator
ATTEST:
By:
Robert S. McKinnell, City Clerk
APPROVED AS TO FORM:
By:
Christian L. Bettenhausen, City Attorney
6 Ti
August 18, 2026
City of Placentia
Attention: Gabriel Guerrero-Gabany
Deputy Director of Public Works
401 E. Chapman
Placentia, CA 92870
Exhibit "A"
Subject: Cost Proposal for Additional Construction Management Services for the Golden Avenue Bridge Rehabilitation Project & Orange County Bikeway Loop Segment D From Station 21 +00 North of Golden Avenue to Station 31 +00 South of Golden Avenue 1 Federal Project No. BRLS 5269(025)
Dear Mr. Guerrero-Gabany,
As you are aware, the construction schedule for the Golden Avenue Bridge Rehabilitation Project has experienced delays due to several utility work, especially South Edisson Work which prevented the controlling activities to be completed on schedule. Based on the latest design changes, the approved Time Impact Analysis, and the most current construction schedule, the project is now anticipated to be completed on November 22, 2026, including the one-month closeout period.
Please note that TYLin's original commitment to the City of Placentia was to provide Construction Management services for 120 working days, which concluded on August 10, 2026. As a result of the project delays and extended construction duration, additional Construction Management services are required beyond the originally authorized scope and budget.
Enclosed for your review are our proposed staffing plan and estimated fee amendment. Based on current projections, the existing budget for several Construction Management services will be fully expended by mid-August 2026.
Reauest Summary
In summary, we are asking the City to increase our Construction Management budget for this project by an amount of $264,608, from $751,331 to $1,015,939.
We appreciate the City's consideration of this request and respectfully seek your approval so that TYLin may continue providing uninterrupted Construction Management services through project completion If you have any questions, please do not hesitate to give me a call at 949-466-4640.
Sincerely,
Joseph Smith
Mazen Mneimneh
Vice President/Principal-in-Charge Resident Engineer/Structures Representative 707 Wilshire Boulevard, Suite 4900 Los Angeles, California 90017 1 T 213.943.7960 1 www.tylin.com An Affirmative Action / Equal Opportunity Employer M/F/D/V 7 Star, Date February 17, 20261 CONSTRUCTION PHASE
120 Working Days as per RFP
CM Services Key Staff
CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES
FOR THE GOLDEN AVENUE BRIDGE REHABILITATION PROJECT
ORANGE COUNTY BIKEWAY LOOP SEGMENT D FROM STATION 21+00 NORTH OF GOLDEN AVENUE TO STATION 31+00 SOUTH OF GOLDEN AVENUE
FEDERAL PROJECT NO. BRLS 5269(025)
FEE PROPOSAL BY MONTH (February 2026 - August 2026)
Construction Completion August 10, 2026
-26 M-26 A-26 M-26 J-26 J-26 No. of Hours
Rate/Hour
Original Contract
Total (0)
10 -Aug -26 Additional Extension 2 rrom 08 10-26 to 10-30 Close-out Amendment #1 -
Source Inspection
TOTAL Budget
(Original a
amendment)
Forecasted Remaning
as of Aug 10, 2026
Rate/Hour
2026-08-10
September
October
November
Total number of
hours
Total
Total Request for
Amendment#2
Principle in Charge -Joseph Smith, PE (TYLin) 8 8 8 24 033064 67,935 Resident Engineer/ Structures Representative -Maven Mneimneh, PE (Tylia) 160 120 120 120 120 120 760 033486 $254,490 Structures Inspector - Bruce Fock-Yet (OSLin) 160 160 160 160 160 160 960 $193 57 8185,827 Scheduling - Avraham Frank (TYLin) 32 24 24 24 24 24 152 $216 33 832,882 Office Engineer (TYLin) 120 120 120 120 120 120 720 $13516 $97,315 Materials Testing (S2 Engineering) $54,889
Source Inspection Optional (S2 Engineering)
Admin 8 Project Support - (TYLin) 1 4 4 4 4 4 4 24 $15900 03,816 Subtotal (Labor) 488 1428 1428 1428 1436 1436 I 2,638 $637,155 $38,240
838,240
$330.64
3334.86 80 120 120 60 400 8133,942
3218.37 120 168 168 456 988,268
3216.33 24 24 48 810,384
3135.16 80 120 120 100 440 859,470
0 85,000.00
0 $159.00 4 4 16 82,544
I9675,395
Other Direct Costs
1 Optional ODC 1
Mileage
ODC - Source Inspection Optional
ODC - Materials Testing
Cultural Resources - Native Tribe Coordination (APRM)
Other
Total Direct Costs
CM Services Total
Total Subconsultants
$10,000
816,910
$44,026
85,000
875,936
8713,091
80 Option Source
Inspection
8713,091
Biggs Cardosa Associates
152 Engineering (DBE)
APRM (DBE)
_ CM Services Total
6118,825
25 48%
15 43%
838,240
$713,091
$38,240
$751,331
$35,000
$299,608
$264,608
Log
1 - Schedule of Rate is based on one 8 -hour shift, regular time rates 2- Fee Proposal based on 120 days as per the Caty's request 1- Prevad,49 Wage Rates are soblo,1 to Increases pursuant to the State ofCaliformn's Department of -Industrial Relations Wage Rate Detemunations 4 -All required closeout items are included whin TY Lin's scope. However, d the closeout period extends beyond the anticipated working days due to delays in paperwork completion following constructor , add9onal costs may apply
03 0)
CITY OF PLACENTIA
PROFESSIONAL SERVICES AGREEMENT
WITH
T.Y. LIN INTERNATIONAL
THIS AGREEMENT is made and entered into this 18TH day of November, 2025 ("Effective Date"), by and between the CITY OF PLACENTIA, a municipal corporation ("City"), and T.Y. Lin International, a California of corporation ("Consultant").
WITNESSETH:
A. WHEREAS, City proposes to utilize the services of Consultant as an independent contractor to provide construction management and inspection services for the Golden Avenue Bridge Rehabilitation Project, as more fully described herein; and B. WHEREAS, Consultant represents that it is "design professional" as that term is defined by California Civil Code Section 2782.8 and has that degree of specialized expertise contemplated within California Government Code Section 37103, and holds all necessary licenses to practice and perform the services herein contemplated; and C. WHEREAS, City and Consultant desire to contract for the specific services described in Exhibit "A" (the "Project") and desire to set forth their rights, duties and liabilities in connection with the services to be performed; and
D. WHEREAS, no official or employee of City has a financial interest, within the provisions of Sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.
NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:
1.0. SERVICES PROVIDED BY CONSULTANT
1.1. Scope of Services. Consultant shall provide the professional services described in the Consultant's Proposal ("Proposal"), attached hereto as Exhibit "A" and incorporated herein by this reference.
1.2. Professional Practices. All professional services to be provided by Consultant pursuant to this Agreement shall be provided by personnel experienced in their respective fields and in a manner consistent with the standards of care, diligence and skill ordinarily exercised by professional consultants in similar fields and circumstances in accordance with sound professional practices. Consultant also warrants that it is familiar with all laws that may affect its performance of this Agreement and shall advise City of any changes in any laws that may affect Consultant's performance of this Agreement. Consultant shall keep itself informed of State and Federal laws and regulations which in any manner affect those employed by it or in any way affect the performance of its service pursuant to this Agreement. The Consultant shall at all times observe and comply with all such laws and regulations. Officers and employees shall not be liable at law or in equity occasioned by failure of the Consultant to comply with this section.
1.3. Performance to Satisfaction of City. Consultant agrees to perform all the work to the complete satisfaction of the City and within the hereinafter specified. Evaluations of the work will be done by the City Administrator or his or her designee. If the quality of work is not satisfactory, City in its discretion has the right to:
(a) Meet with Consultant to review the quality of the work and resolve the matters of concern;
(b) Require Consultant to repeat the work at no additional fee until it is satisfactory; and/or
(c) Terminate the Agreement as hereinafter set forth.
1.4. Warranty. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers' compensation insurance and safety in employment; and all other Federal, State, and local laws and ordinances applicable to the services required under this Agreement. Consultant warrants that it is not suspended or debarred from doing business with the United States government and can legally be paid from federal funds. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys' fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant's performance under this Agreement.
1.5. Non-discrimination. In performing this Agreement, Consultant shall not engage in, nor permit its agents to engage in, discrimination in employment of persons because of their race, religion, color, national origin, ancestry, age, physical handicap, medical condition, marital status, sexual gender, or sexual orientation, except as permitted pursuant to Section 12940 of the Government Code. Such actions shall include, but not be limited to the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay, or other forms of compensation and selection for training, including apprenticeship.
Consultant agrees to post in conspicuous places, available to employees and applicants for employment, a notice setting forth provisions of this non-discrimination clause.
Consultant shall, in all solicitations and advertisements for employees placed by, or on behalf of Consultant shall state that all qualified applicants will receive consideration for employment without regard to age, race, color, religion, sex, marital status, national origin, or mental or physical disability. Consultant shall cause the paragraphs contained in this Section to be inserted in all subcontracts for any work covered by the Agreement, provided that the foregoing provisions shall not apply to subcontracts for standard commercial supplies or raw materials.
1.6. Non -Exclusive Agreement. Consultant acknowledges that City may enter into agreements with other consultants for services similar to the services that are subject to this Agreement or may have its own employees perform services similar to those services contemplated by this Agreement.
1.7. Delegation and Assignment. This is a personal service contract, and the duties set forth herein shall not be delegated or assigned to any person or entity without the prior written consent of City. Consultant may engage a subcontractor(s) as permitted by law and may employ other personnel to perform services contemplated by this Agreement at Consultant's sole cost and expense. All insurance requirements contained in this Agreement are independently applicable to any and all subcontractors that Consultant may engage during the term of this Agreement.
2 T.Y. Lin International
Rev. 01/2024
O
1.8. Confidentiality. Employees of Consultant in the course of their duties may have access to financial, accounting, statistical, and personnel data of private individuals and employees of City. Consultant covenants that all data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Consultant without written authorization by City. City shall grant such authorization if disclosure is required by law. All City data shall be returned to City upon the termination of this Agreement. Consultant's covenant under this Section shall survive the termination of this Agreement.
2.0. COMPENSATION AND BILLING
2.1. Compensation. Consultant shall be paid in accordance with the fee schedule set forth in Exhibit "A". Consultant's total compensation shall not exceed Seven Hundred and Thirteen Thousand and Ninety One Dollars ($713,091), unless authorized herein.
2.2. Additional Services. Consultant shall not receive compensation for any services provided outside the scope of services specified in the Consultant's Proposal or which is inconsistent with or in violation of the provisions of this Agreement unless the City or the Project Manager for this Project, prior to Consultant performing the additional services, approves such additional services in writing. It is specifically understood that oral requests and/or approvals of such additional services or additional compensation shall be barred and are unenforceable.
Should the City request in writing additional services that increase the hereinabove described "Scope of Services", an additional fee based upon the Consultant's standard hourly rates shall be paid to the Consultant for such additional services. Such increase in additional fees shall be limited to 10% of the total contract sum. The City Administrator is authorized to approve a Change Order for such additional services. Where the original contract is $40,000.00 or less, City Council approval shall be required prior to any increase bringing the total compensation to more than $40,000.00.
2.3. Method of Billing. Consultant may submit invoices to the City for approval on a progress basis, but no more often than two times a month. Said invoice shall be based on the total of all Consultant's services which have been completed to City's sole satisfaction. City shall pay Consultant's invoice within forty-five (45) days from the date City receives said invoice. Each invoice shall describe in detail the services performed, the date of performance, and the associated time for completion. Any additional services approved and performed pursuant to this Agreement shall be designated as "Additional Services" and shall identify the number of the authorized change order, where applicable, on all invoices.
2.4. Records and Audits. Records of Consultant's services relating to this Agreement shall be maintained in accordance with generally recognized accounting principles and shall be made available to City or its Project Manager for inspection and/or audit at mutually convenient times for a period of three (3) years from the Effective Date.
3.0. TIME OF PERFORMANCE
3.1. Commencement and Completion of Work. The professional services to be performed pursuant to this Agreement shall commence within five (5) days from the Effective Date of this Agreement. Said services shall be performed in strict compliance with the Project Schedule approved by City as set forth in Exhibit "A".
3 T.Y. Lin International
Rev. 01/2024
3.2. Excusable Delays. Neither party shall be responsible for delays or lack of performance resulting from acts beyond the reasonable control of the party or parties. Such acts shall include, but not be limited to, acts of God, fire, strikes, material shortages, compliance with laws or regulations, riots, acts of war, or any other conditions beyond the reasonable control of a party. If a delay beyond the control of the Consultant is encountered, a time extension may be mutually agreed upon in writing by the City and the Consultant. The Consultant shall present documentation satisfactory to the City to substantiate any request for a time extension.
4.0. TERM AND TERMINATION
4.1. Term. This Agreement shall commence on the Effective Date and continue for a period of thirty six months, ending on November 18, 2028, unless previously terminated as provided herein or as otherwise agreed to in writing by the parties. One (1) two-year extension is available based on Consultant performance and at the discretion of the City.
4.2. Notice of Termination. The City reserves and has the right and privilege of canceling, suspending, or abandoning the execution of all or any part of the work contemplated by this Agreement, with or without cause, at any time, by providing at least fifteen (15) days prior written notice to Consultant. The termination of this Agreement shall be deemed effective upon receipt of the notice of termination. In the event of such termination, Consultant shall immediately stop rendering services under this Agreement unless directed otherwise by the City. If the City suspends, terminates, or abandons a portion of this Agreement such suspension, termination, or abandonment shall not make void or invalidate the remainder of this Agreement.
If the Consultant defaults in the performance of any of the terms or conditions of this Agreement, it shall have ten (10) days after service upon it of written notice of such default in which to cure the default by rendering a satisfactory performance. In the event that the Consultant fails to cure its default within such period of time, the City shall have the right, notwithstanding any other provision of this Agreement, to terminate this Agreement without further notice and without prejudice to any other remedy to which it may be entitled at law, in equity or under this Agreement.
The City shall have the right, notwithstanding any other provisions of this Agreement, to terminate this Agreement, at its option and without prejudice to any other remedy to which it may be entitled at law, in equity or under this Agreement, immediately upon service of written notice of termination on the Consultant, if the latter should:
a. Be adjudged a bankrupt;
b. Become insolvent or have a receiver of its assets or property appointed because of insolvency;
c. Make a general assignment for the benefit of creditors; d. Default in the performance of any obligation or payment of any indebtedness under this Agreement;
e. Suffer any judgment against it to remain unsatisfied or unbonded of record for thirty (30) days or longer; or
f. Institute or suffer to be instituted any procedures for reorganization or 4 T.Y. Lin International
Rev. 01/2024
N
rearrangement of its affairs.
4.3. Compensation. In the event of termination, City shall pay Consultant for reasonable costs incurred and professional services satisfactorily performed up to and including the date of City's written notice of termination within thirty-five (35) days after service of the notice of termination. Compensation for work in progress shall be prorated based on the percentage of work completed as of the effective date of termination in accordance with the fees set forth herein.
In ascertaining the professional services actually rendered hereunder up to the effective date of termination of this Agreement, consideration shall be given to both completed work and work in progress, to complete and incomplete drawings, and to other documents pertaining to the services contemplated herein whether delivered to the City or in the possession of the Consultant. City shall not be liable for any claim of lost profits.
4.4. Documents. In the event of termination of this Agreement, all documents prepared by Consultant in its performance of this Agreement including, but not limited to, finished or unfinished design, development and construction documents, data studies, drawings, maps, and reports, shall be delivered to the City within ten (10) days of delivery of termination notice to Consultant, at no cost to City. Any use of uncompleted documents without specific written authorization from Consultant shall be at City's sole risk and without liability or legal expense to Consultant.
5.0. INSURANCE
5.1. Insurance. The Consultant and all subcontractors, if any, shall procure and maintain, at its sole cost and expense, in a form and content satisfactory to City, during the entire term of this Agreement including any extension thereof, insurance as set forth in Exhibit "B" attached hereto and incorporated herein by this reference.
Neither the City nor any of its officers, officials, agents, employees, or volunteers makes any representation that the types of insurance and the limits specified to be carried by Consultant under this Agreement are adequate to protect Consultant. If Consultant believes that any such insurance coverage is insufficient, Consultant shall provide, at its own expense, such additional insurance as Consultant deems adequate.
5.2. Deductible or Self Insured Retention. If any of such policies provide for a deductible or self-insured retention to provide such coverage, the amount of such deductible or self-insured retention shall be approved in advance by City. No policy of insurance issued as to which the City is an additional insured shall contain a provision which requires that no insured except the named insured can satisfy any such deductible or self-insured retention.
5.3. Certificates of Insurance. Consultant shall provide to City certificates of insurance showing the insurance coverages, as well as providing the City with the required endorsements described above, in a form and content approved by City, prior to performing any services under this Agreement. The certificates of insurance and endorsements shall be attached hereto as Exhibit "C" and incorporated herein by this reference.
5.4. Non -limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.
6.0. GENERAL PROVISIONS
5 T.Y. Lin International
Rev. 01/2024
6.1. Entire Agreement. This Agreement constitutes the entire agreement between the parties with respect to any matter referenced herein and supersedes any and all other prior writings and oral negotiations. This Agreement may be modified only in writing and signed by the parties in interest at the time of such modification. The terms of this Agreement shall prevail over any inconsistent provision in any other contract document appurtenant hereto, including exhibits to this Agreement.
6.2. Representatives. The City Administrator or his or her designee shall be the representative of City for purposes of this Agreement and may issue all consents, approvals, directives, and agreements on behalf of the City, called for by this Agreement, except as otherwise expressly provided in this Agreement.
Consultant shall designate a representative for purposes of this Agreement who shall be authorized to issue all consents, approvals, directives, and agreements on behalf of Consultant called for by this Agreement, except as otherwise expressly provided in this Agreement.
6.3. Project Managers. City shall designate a Project Manager to work directly with Consultant in the performance of this Agreement. It shall be the Consultant's responsibility to assure that the Project Manager is kept informed of the progress of the performance of the services and the Consultant shall refer any decision, which must be made by City, to the Project Manager. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Project Manager.
Consultant shall designate a Project Manager who shall represent it and be its agent in all consultations with City during the term of this Agreement and who shall not be changed by Consultant without the express written approval by the City. Consultant or its Project Manager shall attend and assist in all coordination meetings called by City.
6.4. Notices. Any notices, documents, correspondence, or other communications concerning this Agreement or the work hereunder may be provided by personal delivery, facsimile or if mailed, shall be addressed as set forth below and placed in a sealed envelope, postage prepaid, and deposited in the United States Postal Service. Such communication shall be deemed served or delivered: a) at the time of delivery if such communication is sent by personal delivery; b) at the time of transmission if such communication is sent by facsimile; and c) 72 hours after deposit in the U.S. Mail as reflected by the official U.S. postmark if such communication is sent through regular United States mail.
IF TO CONSULTANT:
T.Y. Lin International
707 Wilshire Blvd, Suite 4900,
Los Angeles, CA 90017
Tel: (619) 908-3306
Attn: Joseph Smith
IF TO CITY:
City of Placentia
401 E. Chapman Ave.
Placentia CA, 92870
Tel: 714-993-8250
Attn: Gabriel Guerrero
6.5. Attorneys' Fees. In the event that litigation is brought by any party in connection with this Agreement, the prevailing party shall be entitled to recover from the opposing party all costs and expenses, including reasonable attorneys' fees, incurred by the prevailing party in the 6 T.Y. Lin International
Rev. 01/2024
exercise of any of its rights or remedies hereunder or the enforcement of any of the terms, conditions, or provisions hereof.
6.6. Governing Law. This Agreement shall be governed by and construed under the laws of the State of California without giving effect to that body of laws pertaining to conflict of laws. In the event of any legal action to enforce or interpret this Agreement, the parties hereto agree that the sole and exclusive venue shall be a court of competent jurisdiction located in Orange County, California. Consultant agrees to submit to the personal jurisdiction of such court in the event of such action.
6.7. Assignment. Consultant shall not voluntarily or by operation of law assign, transfer, sublet, or encumber all or any part of Consultant's interest in this Agreement without City's prior written consent. Any attempted assignment, transfer, subletting, or encumbrance shall be void and shall constitute a breach of this Agreement and cause for termination of this Agreement. Regardless of City's consent, no subletting or assignment shall release Consultant of Consultant's obligation to perform all other obligations to be performed by Consultant hereunder for the term of this Agreement.
6.8. Indemnification and Hold Harmless. Consultant agrees to protect, defend, indemnify, and hold free and harmless the City, its officers, officials, agents, employees, and volunteers, at Consultant's sole expense, from and against any and all claims, liabilities, demands, actions, expenses, damages, suits, or other legal proceedings brought against the City, its elected and appointed officials, officers, agents and employees arising out of or in any way connected with the performance of the Consultant, its employees, and/or authorized subcontractors' work undertaken pursuant to this Agreement including all acts or omissions, willful misconduct or negligent conduct, whether active or passive, on the part of the Consultant, its employees and/or subcontractors. The defense obligation provided for hereunder shall apply whenever any claim, action, complaint or suit asserts liability against the City, its officers, officials, agents, employees, and volunteers based upon the work performed by the Consultant, its employees, and/or authorized subcontractors under this Agreement, whether or not the Consultant, its employees, and/or authorized subcontractors are specifically named or otherwise asserted to be liable, and whether or not there is any evidence of fault or wrongdoing by the Consultant, its employees and/or its subcontractors. Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints, or suits arising out of the sole active negligence or willful misconduct of the City. This provision shall supersede and replace all other indemnity provisions contained either in the City's specifications or Consultant's Proposal, which shall be of no force and effect. Notwithstanding the foregoing, to the extent that this Agreement includes design professional services under California Civil Code Section 2782.8, as may be amended from time to time, such duties of Consultant to indemnify shall only be to the full extent permitted by California Civil Code Section 2782.8.
6.9. Independent Contractor. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent.
Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant's employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its or employees are in any manner agents or employees of City. Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, 7 T.Y. Lin International
Rev. 01/2024
agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker's compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant's failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.
6.10. PERS Eligibility Indemnification. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.
Notwithstanding any other agency, State, or Federal policy, rule, regulation, law, or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.
6.11. Cooperation. In the event any claim or action is brought against City relating to Consultant's performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require.
6.12. Ownership of Documents. All findings, reports, documents, information, and data including, but not limited to, computer tapes or discs, preliminary notes, working documents, files, and tapes furnished or prepared by Consultant or any of its subcontractors in the course of performance of this Agreement, shall be and remain the sole property of City. Consultant agrees that any such documents or information shall not be made available to any individual or organization without the prior consent of City, but shall be made available to the City within ten (10) days of request or within ten (10) days of termination. Any use of such documents for other projects not contemplated by this Agreement, and any use of incomplete documents, shall be at the sole risk of City and without liability or legal exposure to Consultant. City shall indemnify and hold harmless Consultant from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from City's use of such documents for other projects not contemplated by this Agreement or use of incomplete documents furnished by Consultant.
Consultant shall deliver to City any findings, reports, documents, information, data, preliminary notes and working documents, in any form, including but not limited to, computer tapes, discs, files audio tapes, or any other Project related items as requested by City or its authorized representative, at no additional cost to the City. Consultant or Consultant's agents shall execute such documents as may be necessary from time to time to confirm City's ownership of the copyright in such documents.
6.13. Public Records Act Disclosure. Consultant has been advised and is aware that this Agreement and all reports, documents, information, and data, including, but not limited to, 8 T.Y. Lin International
Rev. 01/2024
computer tapes, discs, or files furnished or prepared by Consultant, or any of its subcontractors, pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code Section 7920.000 et seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code Section 7924.510, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court.
6.14. Conflict of Interest. Consultant and its officers, employees, associates, and subconsultants, if any, will comply with all conflict of interest statutes of the State of California applicable to Consultant's services under this agreement, including, but not limited to, the Political Reform Act (Government Code Sections 81000, et seq.) and Government Code Section 1090.
During the term of this Agreement, Consultant and its officers, employees, associates, and subconsultants shall not, without the prior written approval of the City Representative, perform work for another person or entity for whom Consultant is not currently performing work that would require Consultant or one of its officers, employees, associates, or subconsultants to abstain from a decision under this Agreement pursuant to a conflict of interest statute. Consultant's duties and services under this Agreement shall not include preparing or assisting the City with any portion of the City's preparation of a request for proposals, request for qualifications, or any other solicitation regarding a subsequent or additional contract with the City. The City shall at all times retain responsibility for public contracting, including with respect to any subsequent phase of this project.
Consultant's participation in the planning, discussions, or drawing of project plans or specifications shall be limited to conceptual, preliminary, or initial plans or specifications.
Consultant shall cooperate with the public entity to ensure that all bidders for a subsequent contract on any subsequent phase of this project, if any, have access to the same information, including all conceptual, preliminary, or initial plans or specifications prepared by Consultant pursuant to this Agreement.
6.15. Responsibility for Errors. Consultant shall be responsible for its work and results under this Agreement. Consultant, when requested, shall furnish clarification and/or explanation as may be required by the City's representative, regarding any services rendered under this Agreement at no additional cost to City. In the event that an error or omission attributable to Consultant occurs, then Consultant shall, at no cost to City, provide all necessary design drawings, estimates, and other Consultant professional services necessary to rectify and correct the matter to the sole satisfaction of City and to participate in any meeting required with regard to the correction.
6.16. Prohibited Employment. Consultant will not employ any regular employee of City while this Agreement is in effect. Furthermore, Consultant will comply with the following:
(a) Unauthorized Aliens. Consultant hereby represents and warrants that it will comply with all of the provisions of the Federal Immigration and Nationality Act, 8 U.S.C.A. §§ 1101, et seq., as amended, and in connection therewith, shall not employ unauthorized aliens as defined therein. Should Consultant so employ such unauthorized aliens for the performance of any work and/or services under this Agreement, and should any liability or sanctions be imposed against City for such use of unauthorized aliens, Consultant hereby agrees to reimburse City for any and all liabilities, actions, suits, claims, demands, losses, costs, judgments, 9 T.Y. Lin International
Rev. 01/2024
arbitration awards, settlements, damages, demands, orders, or penalties which arise out of or are related to such employment, together with any and all costs, including attorneys' fees, incurred by City. (b) E-Verifv. If Consultant is not already enrolled in the U.S. Department of Homeland Security's E -Verify program, Consultant shall enroll in the E - Verify program within fifteen (15) days of the effective date of this Agreement to verify the employment authorization of employees assigned to perform work hereunder. Consultant shall verify employment authorization within three (3) days of hiring a new employee to perform work under this Agreement. Information pertaining to the E -Verify program can be found at http://www.uscis.aov , or access the registration page at https://e-verifv.uscis.aov/enroll . Consultant shall certify its registration with E -Verify and provide City its registration number within sixteen days of the effective date of this Agreement. Failure to provide certification will result in withholding payment until full compliance is demonstrated.
6.17. Order of Precedence. In the event of an inconsistency in this Agreement and any of the attached Exhibits, the terms set forth in this Agreement shall prevail. If, and to the extent this Agreement incorporates by reference any provision of any document, such provision shall be deemed a part of this Agreement. Nevertheless, if there is any conflict among the terms and conditions of this Agreement and those of any such provision or provisions so incorporated by reference, the conflict shall be resolved by giving precedence in the following order, if applicable:
This Agreement, the City's Request for Proposals, the Consultant's Proposal.
6.18. Costs. Each party shall bear its own costs and fees incurred in the preparation and negotiation of this Agreement and in the performance of its obligations hereunder except as expressly provided herein.
6.19. No Third Party Beneficiary Rights. This Agreement is entered into for the sole benefit of City and Consultant and no other parties are intended to be direct or incidental beneficiaries of this Agreement and no third party shall have any right in, under or to this Agreement.
6.20. Headings. Paragraphs and subparagraph headings contained in this Agreement are included solely for convenience and are not intended to modify, explain or to be a full or accurate description of the content thereof and shall not in any way affect the meaning or interpretation of this Agreement.
6.21. Construction. The parties have participated jointly in the negotiation and drafting of this Agreement. In the event an ambiguity or question of intent or interpretation arises with respect to this Agreement, this Agreement shall be construed as if drafted jointly by the parties and in accordance with its fair meaning. There shall be no presumption or burden of proof favoring or disfavoring any party by virtue of the authorship of any of the provisions of this Agreement.
6.22. Amendments. Only a writing executed by the parties hereto or their respective successors and assigns may amend this Agreement.
6.23. Waiver. The delay or failure of either party at any time to require performance or compliance by the other of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance. No waiver of any provision of this Agreement shall be effective unless in writing and signed by a duly authorized representative 10 T.Y. Lin International
Rev. 01/2024
op
of the party against whom enforcement of a waiver is sought. The waiver of any right or remedy in respect to any occurrence or event shall not be deemed a waiver of any right or remedy in respect to any other occurrence or event, nor shall any waiver constitute a continuing waiver.
6.24. Severabilitv. If any provision of this Agreement is determined by a court of competent jurisdiction to be unenforceable in any circumstance, such determination shall not affect the validity or enforceability of the remaining terms and provisions hereof or of the offending provision in any other circumstance. Notwithstanding the foregoing, if the value of this Agreement, based upon the substantial benefit of the bargain for any party, is materially impaired, which determination made by the presiding court or arbitrator of competent jurisdiction shall be binding, then both parties agree to substitute such provision(s) through good faith negotiations.
6.25. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original. All counterparts shall be construed together and shall constitute one agreement.
6.26. Corporate Authority. The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by doing so the parties hereto are formally bound to the provisions of this Agreement.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their respective authorized officers, as of the date first above written.
CITY OF PLACENTIA,
A municipal corporation
Jennifer Lamp man City Administrator
ATTEST:
ketibieF
City Clerk and ex -officio Clerk
of the City of Placentia
CONSULTANT:
Signature
Joseph Smith
Joseph Smith, President
11 Date: /2-11
Date: November 4, 2025
T.Y. Lin International
Rev. 01/2024
Social Security or Taxpayer ID Number
APPROVED AS TO FORM:
Date:
hristian L. Bettenhausen, City Attorney /
APPROVED AS TO INSURANCE:
yndi • Iv: renga, Risk Manager
APPROVED AS TO CONTENT
Gabriel Guerrero, Project Manager
DEPARTMENTAL APPROVAL:
Chris Tanio
Director of Public Works/City Engineer
12 Date: / 2/4 2.5
Date: /./.i/2A-
Date:
./.i/2(Date:
T.Y. Lin International
Rev. 01/2024
EXHIBIT A
CONSULTANT'S PROPOSAL AND SCOPE OF WORK
13 T.Y. Lin International
Rev. 01/2024
N
'rain
wz J 'a i
CONSTiiijC;ii()N MANAGEMENT AND INSPECTIONS SERVICES FOR The Golden Avenue Bridge
Rehabilitation Project & Orange County
Bikeway Loop Segment D from Station
21+00 North of Golden Avenue to
Station 31+00 South of Golden Avenue
City of Placentia
October 16, 2025 — RFP No. PW -25-05 I Federal Project No. BRLS 5269(025)
Contents
iii A. Cover Letter
1 B. Executive Summary
Firm History
Subconsultants
4 C. Project Team Organization
Key Staff
Organization Chart
R1 Resumes
6 D. Relevant Project
Experience and References
References
13 E. Financial Capacity
14 F. Project Understanding and
Approach
18 G. Scope of Work
21 H. Schedule
v Exceptions
viii Required Forms
C onnecting
PEOPLE PLACES IDEAS
Colf, Client Focused
We strive to always give our
clients the best solutions
pRs
Integrity
We do the right thing in an ethical,
fair, and sustainable way.
Collaboration
We bring a diverse and inclusive
team, working together toward
technical excellence.
Innovation
We strive to create new and
better ways to solve our
clients' toughest challenges.
11141 fl
REQUIRED STATEMENTS
► TYLin will perform the
services and adhere to the
requirements described in
this request for proposals
(RFP) and Addenda
#1 and #2. TYLin also
acknowledges Q&A sets 1,
2, 3, and 4.
► The fee proposal is
considered proprietary and
should not be releasable as
public information.
► We will not substitute
members of our team
without approval by the
City of Placentia staff.
► There has been no Collusion
with other proposing firms.
► Our team agrees to
and is able to fulfill the
indemnification and
insurance requirements
contained in the
sample contract.
► Please see Section F
(pg. 14) for our approach
to preventing conflicts of
interest with respect to
this project.
October 16, 2025
City of Placentia
Attn: Gabriel Guerrero-Gabany,
Deputy Director of Public Works
401 E. Chapman Avenue
Placentia, CA 92870
Subject: Professional Construction Management and Inspection Services for the Golden Avenue Bridge Rehabilitation Project & Orange County Bikeway Loop Segment D from Station 21+00 North of Golden Avenue to Station 31+00 South of Golden Avenue
Dear Mr. Guerrero-Gabany,
T.Y. Lin International (TYLin) is excited to collaborate with the City of Placentia (City) to provide Professional Construction Management (CM) and Inspection Services for the Golden Avenue Bridge Rehabilitation Project & Orange County Bikeway Loop Segment D from Station 21+00 North of Golden Avenue to Station 31+00 South of Golden Avenue (Project).
TYLin has the expertise to make this project a success, with the main goal to deliver the project within budget, schedule and minimize community impact. We have a long history of working with local agencies on California Department of Transportation's (Caltrans) federally -funded bridge projects and have assembled a team of highly experienced professionals to deliver effective CM services. Under the City's direction, we are prepared to provide comprehensive planning including a full constructability review, regular and meaningful schedule review, and proactive partnering with the Contractor.
The following pages demonstrate these strengths consistently through our project experience and in our proposed key staff.
TYLin's Principal -in -Charge, Joseph Smith, PE, CCM, began his career with Caltrans Structures Construction working in District 7. He has continued as a consultant providing inspection, CM and project management services to Caltrans and numerous other agencies throughout Southern California. His "client -first" approach is demonstrated by his regular outreach to clients to assess their satisfaction with on- site staff. His extensive project -specific experience and understanding of construction issues will provide an experienced resource for any project issue that may arise.
The experienced and qualified TYLin Team will be led by Resident Engineer/ Structures Representative, Mazen Mneimneh PE, QSD, who will be the City's primary point of contact and will manage all aspects of the project. His understanding of the various structures components along with required coordination with the United States Army Corps of Engineers (USACE), Los Angeles County Flood Department (LACFCD) and other key stakeholders make him an excellent choice for this project. Mazen brings more than 25 years of CM and engineering experience, specializing in public works construction. He has successfully delivered 10 bridge projects over the past decade, including five federally funded through the Highway Bridge Program (HBP), further detailed in his resume. Mazen will lead a team of experienced construction professionals, who are fully capable to provide any CM, oversight, materials testing and other services that are required to successfully complete this project.
Structural Inspector, Ali Habibi, will work closely with Mazen in the field. His experience includes numerous similar projects such as the OC Loop Carbon Creek Channel Segment D Bikeway Gap Closure with the County of Orange and the Higuera Street Bridge Replacement Project (HBP) with Culver City where he worked directly 707 Wilshire Boulevard, Suite 4900 1 Los Angeles, California 90017 1 T 213.943.7960 1 www.tylin.com An Affirmative Action / Equal Opportunity Employer MIF/DN
'rain
with Mazen. With 10 years of experience in public works/construction inspection experience, Ali brings his knowledge of Caltrans Federally -Funded projects and the City's Standard Plans and Specifications, California Manual on Uniform Traffic Control Devices (MUTCD), and Caltrans Standard Specifications.
Key challenges for the project include:
► Monitor settlement during construction
► Bridge demo work.
► Traffic management and detours.
► Multiple stakeholder coordination.
► Community impact.
► Time -sensitive overall schedule.
► Maintaining bike path access during construction.
The TYLin Team has successfully met and satisfied these and other challenges on similar projects. The TYLin Team has a "Project First" priority that will be reflected daily throughout the project. Working under the City's direction, we are prepared to perform any duties assigned and deliver a well-managed project on time and within budget.
All of TYLin's team members possess the necessary registrations and licenses. Our team is composed of experienced construction managers and inspectors who have the experience working on HBP projects and are knowledgeable of the Caltrans Construction Manual and its supplement for local agency Resident Engineer, Bridge Construction Records and Procedures Manual, Caltrans Standard Specifications, and Local Assistance Procedures Manual (LAPM) in addition to other Office of Structure Construction (OSC) technical manuals.
Our team is available, committed, and eager to begin work on this project. We encourage you to call our references as shown on page 19 of this proposal. We are excited to partner with the City and look forward to the successful delivery of this project.
activities. ► Coordination construction with recently completed bikeway segment D.
► Compliance with the Streambed Alteration, the 404
and 408 permit requirements.
► Ensuring quality in Architectural Fascia installation and finishing.
Joseph Smith*
Vice President/Principal-in-Charge
619.908.3306
[email protected]
*Authorized to bind
Mazen Mneimneh
Resident Engineer/Structures Representative
949.466.4640
[email protected]
707 Wilshire Boulevard, Suite 4900 1 Los Angeles, California 90017 1 T 213.943.7960 1 www.tylin.com An Affirmative Action /Equal Opportunity Employer M/F/DN
3. Executive Summary
Firm History
Founded in 1954, TYLin is a globally recognized, full-service infrastructure consulting firm with more than 3,600
employees in 97 offices across the Americas, Europe, and Asia. California staff includes almost 300 engineers and technicians. This depth of resources, in combination with the commitment of firm management and dedication
of staff at all levels, has led to an enviable record of performance and delivery of quality services.
TYLin is a national leader in bridges.
TYLin, a California Corporation, has enjoyed steady growth with both new and existing clients, accompanied by
consistent profitability, resulting in strong financial health and resiliency. The firm reported $832 million in revenue for 2024 and has strong banking relationships and the ability to access a line of credit, if required, to meet operating cash needs. TYLin has no planned office closures, mergers, or pending litigation that would affect delivery of this project for the City.
In the western United States, TYLin is most recognized
for its engineering and CM capabilities for a variety of projects for both state and local clients. Notable projects in Southern California include the Sixth Street Viaduct Replacement over the Los Angeles River, and the 1-10/
Jefferson Street Interchange. Many of our staff are
former Caltrans employees and highly experienced with
the policies and procedures required for this project. Our Southern California staff work regionally in contributing to the successful delivery of Caltrans projects from offices in Irvine, Los Angeles, Ontario, and San Diego.
CONSTRUCTION MANAGEMENT + INSPECTION
TYLin offers particular expertise in CM and inspection, resident engineering, structures representation,
constructability reviews, and contract administration for transportation projects, including roadways, interchanges, bridges, retaining walls, street improvement, and grading/ earthwork projects. Our CM services include submittal
review, requests for information (RFI), and contract change order (CCO) processing, claims review, scheduling, as well as permit monitoring, structural observation and construction inspection. We perform CM and inspection services
per standard Caltrans procedures using the Caltrans
Construction Manual, LAPM, Standard Specifications for
Public Works Construction (Greenbook), and other Caltrans manuals, guidelines, and criteria.
(PE. "I INI)Er
TYLin specializes in transportation projects, especially federally -funded projects. Over the past 71 years, TYLin has 'lyl.in
NUMBER OF YEARS IN
BUSINESS PROVIDING
IDENTIFIED SERVICES
71 NUMBER OF
PERSONNEL
3,600+
PROJECT OFFICE
Los Angeles
B. EXECUTIVE SUMMARY
•
•
SUPPORTED BY
Ontario, Irvine, San Diego •
TYLIN'S CM SERVICES
— Construction
Management
— Construction Inspection
— Constructability Review
— Structures
Representation
— Schedule and Claims
Expertise
— RFI and Submittal
Coordination
ENR TOP 500 2025 RANKINGS
30 TOP 500
DESIGNERS
— Document Control
— Change Order Reviews
— Compliance with Agency
Requirements
— Public Outreach
Assistance
— BMP Inspection
— Project Closeout
— Punch List Completion
9 TRANSPORTATION
8 BRIDGES
11 22 21
MASS TRANSIT &
RAIL
HIGHWAYS TOP 100 "PURE"
DESIGNERS
participated in well over 100 federally funded projects. The TYLin Team has extensive experience with Caltrans design standards, and Local Assistance policies and procedures to remain compliant with Federal Funding regulations.
Over the past 25 years, Construction projects managed by Mazen Mneimneh, PE, QSD, have been successfully audited by the State and Federal Highway Administration (FHWA). ► TYLin I Golden Avenue Bridge Rehabilitation 1
Table 1. Project Experience
1-710 Corridor Soundwall Project
Firestone Blvd. Bridge Widening over Los Angeles River* Firestone Blvd. Bridge Replacement over San Gabriel River* 1-10 Jefferson Street Interchange
I-215/Scott Road Interchange
I-215/Newport Road Interchange
Sixth Street Viaduct Replacement
Jurupa Road Grade Separation
Cathedral Canyon Drive
1-5/Jeffrey Open Space Trail Pedestrian Bridge
SR-133/Venta Spur Pedestrian Bridge OC Improvements
Dune Palms Road Bridge Replacement
SB Indio Blvd. Overhead Retrofit
Jackson Street Bridge Overhead Retrofit
North Atwater Non -Motorized Multi -Modal Pedestrian Bridge *Mazen's Prior Projects
In addition, each of our key personnel have also worked on numerous FHWA projects. These projects required approval from Caltrans, FHWA, State Water Resources Control Board, California Department of Fish and Wildlife (CDFW), Regional Water Quality Control Boards (RWQCB), and various local government agencies. The project experience table above (Table 1) highlights some of our recent federally funded project experience.
The TYLin Team is comprised of staff that has the right qualifications and relevant experience necessary to
manage the Project. The experience of each of our team
members goes beyond what is expected and exceeds the
requirements set forth by the City. Our team members each have the knowledge and experience working on federally
funded projects using LAPM, and they each have Caltrans construction and contract administration experience.
Subconsultants
TYLin has partnered with local, experienced subconsultants to provide all the services necessary to successfully
complete this project for the City. Our team members were selected based upon demonstrated excellence in their
respective disciplines and our history working together.
B. EXECUTIVE SUMMARY
x
3cr,
BIGGS CAROOSA
ASSOCIATES INC
STRUCTli=tAL ENK:.;INEERS
x x x
x x x
Biggs Cardosa Associates, Inc. (Biggs Cardosa) is an
award-winning California structural engineering firm with over 39 years of experience providing structural engineering design, consulting, and construction management
services for bridges, transportation structures, and
related infrastructure. They provide inspection services per Caltrans Construction Manual, Records & Procedures
Manual, and LAPM requirements. Having served over 100
California public agencies across 24 counties and 60 cities, they bring unique value to construction management and
inspection through our engineering design background.
52 Engineering
S2 Engineering (S2) is a Southern California DBE/SBE firm with more than 24 years of experience providing turn -key construction management and inspection services to public agencies in the transportation sector. In service to the City, S2 will deliver materials testing services with efficient, high quality, and experienced staff. They are experienced 11 TYLin I Golden Avenue Bridge Rehabilitation 2
B. EXECUTIVE SUMMARY
in federal and state -required documentation; have recent similar project experience; and are extremely sensitive to public outreach and communication requirements. S2 has provided construction management, materials testing, plant inspections, source inspections, quality assurance (QA), quality control (QC), and support services on more than 60 construction projects during the past 24 years. Recent and current experience includes: construction management and materials testing for City of Manhattan Beach, Sepulveda Bridge Widening; quality management and assurance materials testing and plant inspection for Los Angeles County Metropolitan Transportation Authority (LA Metro), I-5 North County Enhancements Project; and Material Representative and source inspection services for Caltrans District 59 Materials Engineering and Testing Services (METS), QA and Source Inspection & METS State Wide Oversight Contract.
ArchaeoPaleo Resource Management (APRM) provides full-service archaeological, historical, cultural, ethnographic, historic building assessment, paleontologic consulting, environmental clearance technical reports, and construction monitoring and field oversight services. APRM will provide all Cultural Resources services as listed in the RFP, and will work with, facilitate, and coordinate with the Tribes for Cultural Tribal Resources, per the requirements of the RFP. APRM has developed a strong and effective working relationship with Mazen Mneimneh through direct collaboration on several key projects. Notably, APRM partnered with Mazen on the City of South Gate's Boulevard Regional Corridor Capacity Enhancement project, where teamwork contributed to successful project delivery. This partnership also extended to the City of South Gate's Cultural Resources Services for Capital Improvement Projects and the Urban Orchard Project, fostering mutual trust and seamless coordination with City staff and other stakeholders. This, combined with their knowledge of applicable federal, state, and local laws and guidelines, including the California Environmental Quality Act (CEQA), National Environmental Protection Act (NEPA), Native American Graves Protection and Repatriation Act (NAGPRA), State Historic Preservation Office (SHPO), AB52 Tribal Concerns, Caltrans, California Public Utilities Commission (CPUC), and Specific Vocational Preparation (SVP) guidelines and requirements, prepare us for this contract. ► TYLin I Golden Avenue Bridge Rehabilitation 3
C. PROJECT TEAM ORGANIZATION
C. Project Team Organization
Our key team members have been chosen for their experience with similar projects in all key components of the project development and delivery process and for this Project. We have established a team with sufficient depth to offer both experience and perspectives that help assure a high level of quality. None of our team members have any business or personal relationships with City employees. Mazen Mneimneh is our primary contact and can be reached at Mazen.
[email protected] or 949.466.4640. The following pages summarize our key staff members' experience and the additional staff selected to support them.
The following key staff members are the people assigned to work directly on this project:
Joseph Smith, PE, CCM I Principal in Charge
Joe has 34 years of civil engineering experience in public works construction, managing structures, interchanges, utility, and roadway projects. As Project Manager, Joe has managed more than a dozen HBP-funded projects throughout southern California. He has extensive experience in management and training of representatives and organizing and leading meetings. He is responsible for providing oversight and support by reviewing project files, field visits, and handling all aspects of construction contract administration. He has worked closely with state, federal, and local agency managers to satisfy staffing requests in a timely manner, while controlling and monitoring costs. Joe formerly worked for the Caltrans OSC in Los Angeles.
FIRM: TYLin
AVAILABILITY:
25%
FIRM: TYLin
AVAILABILITY:
100%
'7.44,
FIRM: Biggs
Cardosa
AVAILABILITY:
100%
FIRM: APRM
AVAILABILITY:
25%
Mazen Mneimneh, PE, QSD I Resident Engineer/Structures Representative Mazen is an expert in providing CM and inspection services on complex transportation infrastructure projects. He has the experience (25 years) and the professional credentials (California PE) for the job.
Mazen has been managing complex bridge project for the last 25 years, focusing on HBP-funded bridge projects in Orange and Los Angeles Counties. He has served as a Project Manager, Resident Engineer, Structures Representative on several federally -funded bridge replacements, widening and retrofits. Mazen brings a wealth of field experience in resolving project issues and maintains a steady presence in performing field related duties. He takes pride in having a perfect record of finishing every project that he has started, and his clients find him proactive, energetic, responsive and a problem solver.
Ali Habibi I Structural Inspector
Ali brings over a decade of experience in construction management, with a particular focus on structural inspection and field operations. His expertise lies in performing structural observations, conducting civil and structural inspections, and ensuring labor compliance on transportation and infrastructure projects. In the field, Ali plays a key role in coordinating construction activities, verifying conformance with approved plans and specifications, and supporting QA efforts. He is responsible for reviewing and processing submittals, RFIs, CCOs, and payment applications, while also monitoring certified payroll and insurance documentation to verify full regulatory compliance.
Ali leverages engineering tools such as SAP2000, SAFE, ETABS, Enercalc, AutoCAD, RISA 3D, and Revit to support field assessments and structural evaluations. His hands-on approach, attention to detail, and deep understanding of construction protocols make him a critical asset in delivering high- quality, compliant, and efficient construction outcomes.
Robin Turner 1 Cultural Resources
Robin has over 30 years of experience in the cultural resource profession. She conducts construction management for cultural resource mitigation operation for large scale multi-year construction project. She has previously worked with Mazen Mneimneh, the Resident Engineer, on multiple projects across various agencies. Her expertise in monitoring and managing cultural resources construction operations in order to identify and recover artifacts and features without stopping the construction process is one of her greatest assets. She is currently managing a similar scope on the Urban Orchard project for the City of South Gate, where she is coordinating with Native American tribes to ensure cultural and regulatory compliance.
► TYLin I Golden Avenue Bridge Rehabilitation 4
C. PROJECT TEAM ORGANIZATION
Team Availability + Project Organization Chart
The TYLin Team has confirmed availability to the fullest extend possible to provide the City a full bench of resources upon Notice to Proceed (NTP).
A well -organized team, with clear division of responsibilities, is essential to effectively deliver construction projects. The team organization chart delineates the role of each team member and the reporting relationships. The personnel listed below will be available and are committed to the extent proposed for the duration of the project. Resumes for our staff can be found beginning on page R1.
STAKEHOLDERS
ail az/trans
Caltrans Local Assistance
USACE
CDFW
RWQCB
LACFCD
Los Angeles County Public Works
California Coastal Commission
US Coast Guard
Utilities District
Utility Companies
Local Community
City of Placentia
City of Yorba Linda
CULTURAL RESOURCES
Robin Turner AP (25%) +
RESIDENT` R/
STRUCTURES REPRESENTATIVE
Mazen Mneimneh, PE, QSD (100%) -4--
STRUCTURE
STRUCTURE INSPECTOR
MATERIALS SAMPLING AND TESTING
Jacob Bailey, PE S2 (25%)
► TYLin I Golden Avenue Bridge Rehabilitation
Ali Habibi BC (100%) +
AP APRM
BC Biggs Cardosa
S2 S2
+ Key Personnel
Percentage of time
assigned to the contract
(xx%)
P`INCIPAL-IN-CHARGE
Joseph Smith, PE, CCM (25%) +
OFFIC NGINEER
Abigail Manriquez (50%)
SCHEDULER
Avraham Frank (25%)
AS -NEEDED SUPPLEMENTAL INSPECTORS
Lauren Herbert, PE BC (60%) Bruce Fock-Yat, CMIT, EIT (75%) 5 YEARS OF EXPERIENCE
34 Years
YEARS WITH TYLIN
15 Years
EDUCATION
BS, Civil Engineering,
University of
Massachusetts, Lowell
LICENSE
Professional Engineer,
California #53655,
Arizona #51821,
Nevada #021070
CERTIFICATIONS
CMAA and CMCI Certified
Construction Manager
#A0970
C. PROJECT TEAM ORGANIZATION
Joseph Smith, PE, CCM
Principal in Charge 1 25% Available
Joseph has 34 years of civil engineering experience in public works construction, managing structures, interchanges, utility, and roadway projects. As Project Manager, Joseph has managed more than one dozen HBP-funded projects. He has extensive experience in management and training of representatives and organizing and leading meetings. He is responsible for providing oversight and support and has worked closely with state, federal, and local agency managers to satisfy staffing requests in a timely manner, while controlling and monitoring costs. Joseph formerly worked for Caltrans OSC in Los Angeles.
EXPERIENCE
City of Los Angeles Bureau of Engineering, Sixth Street Viaduct Replacement (CM/GC Delivery) I Los Angeles, CA
Project Manager for this $450M CMGC bridge replacement project. Joseph supported TYLin staff and communicated directly with City staff, assuring all project needs were met. He was also responsible for monitoring the project budget and preparing monthly estimates. The project included a 2,864 foot long network tied -arch continuous concrete viaduct bridge, combined with a 193 -foot -long post - tensioned CIP reinforced concrete box girder structure at the west approach. The multi-year project utilized the CMGC delivery method. The previous Sixth Street Viaduct was constructed in 1932, using reinforced concrete with distinctive T -beam/ steel arch support at the center spans. This structure had been an important landmark, connecting downtown Los Angeles and the arts district in Boyle Heights, spanning the Los Angeles River and State Route 101. In 1986, the Sixth Street Viaduct was found to be eligible for inclusion in the National Register of Historic Places. Over the years, the concrete has deteriorated due to Alkali Silica Reaction. As a result of the deterioration, the structure had been determined to be structurally unable to withstand a moderate earthquake and needs retrofit or replacement. The project also included improvements to local intersections to facilitate improved traffic flows, and the development of local parks and greenbelts to beautify this industrial area. The project site challenges included downtown traffic, working within the Los Angeles River, working over and under very active rail lines operated by five different agencies, dealing with right-of-way challenges, and managing numerous identified and unidentified utility conflicts,
City of Los Angeles Bureau of Engineering, North Atwater Non -Motorized Multi - Modal Bridge I Los Angeles, CA
Project Manager for a task to provide design and construction engineering for a new multi -modal bridge across the Los Angeles River. The new cable -stayed bridge is 325 feet long, 35 feet wide, and has two separate paths to accommodate equestrians and pedestrians/bicyclists. The project required a single concrete pier in the river and two abutments on each end of the bridge. Joseph communicated directly with the City staff assuring all project needs were met. He was also responsible for monitoring the project budget and prepared monthly estimates.
City of Cathedral City, Cathedral Canyon Drive Bridge over Coachella Valley Water District (CVWD) Stormwater Channel I Cathedral City, CA Project Manager supporting the Resident Engineer and the CM team for the construction of a 5 -span cast -in-place (CIP) box girder bridge over CVWD's Stormwater Channel, known as The Whitewater River. The improvements allow for an all-weather crossing for Cathedral Canyon Drive and accommodate for projected growth. The project included relocation of multiple utilities and construction of a new sewer force main through the channel as well as a large drainage drop structure R1
EXPERIENCE CONTINUED
meant to control flow within the channel and avoid scour along the new bridge foundation. The new bridge carries four 12 -foot lanes, a 10 -foot raised median, an 8 -foot outside shoulder/bike path, a 12 -foot multipurpose trail and sidewalk, and a 5 -foot sidewalk.
City of South Gate, 1-710 Corridor Soundwall I South Gate, CA Project Manager supporting the Resident Engineer and the CM team for a $6.7M project which included constructing of a 292 -foot -long retaining wall and an 874 -foot -long soundwall in Caltrans right of way. The soundwalls foundations consisted of 16 -inch to 24 -inch cast -in -drilled -hole (CIDH) concrete pilings. In Caltrans right of way the construction consisted of Roadway excavation (Type Z-2 Aerially Deposited Lead), remove base and surfacing in front of the walls and placing asphalt, minor concrete v ditch behind the walls, curb and gutter, concrete barrier on top of the walls, Soundwall (masonry block), and landscape. On the City of South Gate right of way the construction consisted of removing 539 square feet of block wall in front of Thunderbird Villa Mobile homes, asphalt, curb and gutter, concrete sidewalk, decomposed granite meandering path, transparent noise barrier panels, cold mill asphalt, permeable pavers, landscape, installing 12 -inch Ductile Iron Pipe waterline, and removing 8" Asbestos Cement Pipe waterline. The project was funded by Metro.
County of Riverside Transportation Department, Jurupa Road Grade Separation 1 Jurupa Valley, CA Project Manager and Resident Engineer for a railroad grade separation of the existing Union Pacific Railroad (UPRR) line at the crossing of Jurupa Road. The depression of Jurupa Road under the existing UPRR Mainline will result in lowering Felspar Street to the east of Jurupa Road. The project also involves the construction of a roadway bridge for Van Buren Boulevard, a railroad bridge for UPRR tracks, a temporary railroad shoofly, temporary shoring systems, retaining walls, storm drainage system, pump station, landscaping, roadway improvements, traffic signals, street lighting, and utility relocations along with associated removals and protection of existing facilities. A portion of the roadway along Jurupa Road will be waterproofed and dewatering is expected to be necessary for its construction as well as for the construction of the bridge. All work will be conducted and prepared in accordance with County and/or Caltrans practices, regulations, policies, procedures, manuals, and standards, as appropriate.
County of Riverside Transportation Department, I-10/Jefferson Street Interchange I Indio, CA Project Manager and Resident Engineer on the $44.1M Jefferson Street Interchange at 1-10. The project includes constructing two parallel 440 -foot -long by 78 -foot -wide bridges, construction of all new eastbound and westbound on-/ off -ramps, auxiliary lanes on 1-10, a 50 -foot -tall mechanically stabilized earth (MSE) retaining wall, several Type 1 retaining walls, extensive traffic control, and public outreach. As Resident Engineer, Joseph provided guidance on all project elements starting from pre-bid services through project close-out and contract acceptance. Joe managed TYLin personnel and eight subconsultants on this important project. The I-10/Jefferson Street Interchange is the largest and the last interchange to be reconstructed under Coachella Valley Association of Governments 1-10 Corridor projects.
City of Indio, As -Needed Construction Management and Inspection Services I Indio, CA Project Manager on the City of Indio's on-call contract to provide construction management and inspection services for roads and bridge construction projects. The program provided full construction management and inspection services for State, Local, and Federal funded projects. The program included reconstruction of the Madison Street/Avenue 50 Intersection, which involves temporary realignment of CVWD's Madison Street Canal, temporary bridges at the intersection, realignment of wet and dry utilities, extension of a CIP, double -box culvert. Construction of this intersection occurred around various festivals in the region. The contract also included the retrofit of Southbound Indio Boulevard Overhead, widening of Highway 111, sidewalk and Americans with Disabilities Act (ADA) improvements near Andrew Jackson Elementary School, and the North Indio Paving project.
City of La Quinta, Adams Street Bridge Improvement Project 1 La Quinta, CA Project Manager and Resident Engineer on the $10 million Adams Street Bridge Improvements. The new Adams Street Bridge is a four -span, cast -in-place box -girder structure on large 10 -foot diameter CIDH pile shafts at the piers and 2 -foot diameter CIDH piles at the abutments. The bridge was built in stages, with the west side of the bridge constructed first.
As Resident Engineer, Joseph assisted with pre-bid services providing a review of the bid documents, attending pre- bid meetings, reviewing low -bid contractor paperwork, and providing due diligence checks of multiple contractors. The constructability review included a review of all structure, roadway, and utility sheets. In addition, he managed TYLin staff and subconsultants through the project completion.
R2
'1'fl.in
YEARS OF EXPERIENCE
26 Years
YEARS WITH TYLIN
1.5 Years
EDUCATION
MS, Engineering
Management, Santa Clara
University
BS, Civil Engineering, Beirut
Arab University
LICENSE
Professional Engineer,
California #C65560
QSD, California, #06556
Contractor's B License,
#1010354
C. PROJECT TEAM ORGANIZATION
Mazen Mneimneh, PE, QSD
Resident Engineer 1 100% Available
Mazen has more than 26 years of experience in the design and CM of transportation and structure projects, including bridge construction, highway interchanges, bridge retrofits, street improvements, and roadway rehabilitation. Projects included bridge replacement, grade separations, reinforced concrete channels, bridge seismic retrofits, road widenings, overlay, Portland Cement Concrete (PCC) and asphalt concrete (AC) pavements, retaining walls, signals, landscaping, and sidewalks. He has experience managing multiple projects requiring interfacing and coordination with Caltrans -Local Assistance Program, local, state, federal agencies, environmental and regulatory agencies and utility companies. He oversees structural inspections, materials testing, submittals, shop drawings, RFIs, and CCOs. He reviews contractor's documents (drawings, specifications and technical submittals) for constructability, value engineering and establishes coordination among various design packages to mitigate ambiguity. Mazen schedules work in logical steps and budgets the time required to meet deadlines. He determines staffing requirements and supervises staff assigned to the project; controls and monitors cost, keeps track of project and consultant expenditures, prepares and negotiates CCOs and manages bid process, bid specifications, cost estimates and commercial documents.
EXPERIENCE
City of Norwalk, Firestone Boulevard Bridge Widening 1 Norwalk, CA Resident Engineer/Structure Representative for the for the Firestone Boulevard Widening from Studebaker Road to Imperial Highway. The Firestone Boulevard is to be widened to accommodate three travel lanes in each direction, with Class II bike lanes and 8 -foot sidewalks in each direction. The added lane will require widening of the existing bridge over the UPRR Spur tracks, reducing the current raised median width, and constructing retaining walls to accommodate the steep embankments.
Before any of the bridge work could begin, coordination with the railroad agency took place. Mazen and his team realize the severity of the impacts construction may have on the schedule due to the railroad, and are adhering to the guidelines set forth in the contract documents. Mazen is performing all construction administration services n strict accordance with the latest Caltrans specifications, Caltrans Falsework Manual, OSC technical manuals, MUTCD, Highway Design Manual, Construction Manual, Caltrans Standard Specifications and Standard Plans, City Standards, and Greenbook.
City of Culver City, Higuera Street Bridge Replacement and Ballona Creek Bike Path Connectivity Improvements (HBP) 1 Culver City, CA
Resident Engineer/Structure Representative for the replacement of the existing Higuera Street Bridge over Ballona Creek. The existing bridge features three, 42 -foot - wide travel lanes, sidewalks on both sides, 3 -span steel girders and beam, and a concrete deck. The upgrade will assure compliance with the current seismic and geometric standards and enhance the public safety for bicyclists/pedestrians crossing the bridge and traffic circulation. The project consists of demolition of the existing bridge, construction of a single span PS concrete box girder bridge, and a connection ramp to the bike path.
City of South Gate, Firestone Boulevard Bridge Widening over Los Angeles River (HBP) 1 South Gate, CA
Resident Engineer/Structures Representative for a 473 -foot -tong bridge and 300 -foot -long road widenings; a federally funded HBP following Caltrans Procedures.
As the Resident Engineer and Structure Representative, Mazen led the full-service CM team for this major bridge project. The bridge utilized PC concrete bulbtee girders.
R3
EXPERIENCE CONTINUED
Five Point Gateway, Marine Way Plaza Bridge I Irvine, CA Construction Manager for the North Bridge and Plaza Bridge Project. The scope of work included leading a team of bridge inspectors and to manage the independent QA testing program to ensure the project is in accordance with Caltrans Specifications and the contract drawings. Services included the following: structural observations on site, establishing grades for various bridge elements, coordinating material source inspection, reviewing QA report for compliance, reviewing shop drawings and contractor's submittals.
City of Rancho Santa Margarita, Santa Margarita Parkway Bridge Hinge Repair (HBP) I Rancho Santa Margarita, CA Resident Engineer/Structures Representative for the 1,199 -foot -long and 72 -foot -wide northern bridge of Santa Margarita Parkway. The project includes full hinge demolition and replacement, replacement of the joint seal, and assemblies and joint sidewalk armor at each abutment. The CM team oversaw the removal of an approach median to the east of the bridge to create space for adequate staging.
City of Norwalk, Firestone Boulevard Bridge Replacement Over the San Gabriel River (HBP) I Norwalk, CA Structures Representative for the replacement of a 239 -foot -long, 3 -span structure carrying 6 traffic lanes and concrete sidewalks over the San Gabriel River. Mazen was responsible for the technical and administrative control of the structure elements and oversaw design issues, construction methods, structural inspections, testing, material submittals, shop drawings, RFIs, proposed CCOs.
City of Huntington Beach, Warner Avenue Bridge Rehabilitation (HBP) I Huntington Beach, CA Structures Representative for the construction of the removal and replacement of the concrete barriers, chain link railing, asphalt pavement overlay, unsound concrete at the bridge bents and columns, the replacement of missing rock slope protection in the channel, and removal and replacement of metal beam guardrail. Duties consisted of inspection of the rock slope protection installation, removal of unsound concrete and patching, removal and construction of concrete barrier, installation of wildlife protection railing, metal beam guardrail, and waterproof installation on bridge deck. Progress pay estimates, daily inspection documentation, and resolving field and design issues in a timely manner.
Port of Long Beach (POLB), Gerald Desmond Bridge I Long Beach, CA QC Manager for this bridge replacement project consisting of a 2,000 -foot -long cable stay bridge and several approach bridges and ramp structures. The approach bridges and bifurcating ramp structures are as tall as 180 feet above existing grade and consist of span lengths ranging from 240 to 140 feet. Responsibilities included: monitoring quality design, constructability review, and Caltrans Compliance on several packages of the project. Oversee and support the application of the design -build quality management plan at the project level. Provided input and advice to the project management team and the sub -contractors on the implementation and execution of QC activities.
City of South Gate, "The Boulevard" Firestone Boulevard Regional Corridor Enhancements I South Gate, CA Construction Manager for the improvement to a major gateway to the City. To achieve this goal the number of traffic lanes will be increased from four to six lanes on Firestone Boulevard between Alameda Street and Hunt Avenue. Improvements also include the synchronization of traffic signals, installation of new street signage and construction of raised medians, curb and gutter, and asphalt paving.
Orange County Transportation Authority, Tustin Avenue/Rose Drive laration I Anaheim, CA Construction Support for a grade separation that raises Tustin Avenue/Rose Drive over the Burlington Northern and Santa Fe (BNSF) railroad tracks, Orangethorpe Avenue, and the Atwood Channel. The project includes an overhead structure along with multiple concrete, masonry and MSE retaining walls totaling over 4500 feet in length. The overhead structure is 401 feet long and 118 feet wide and is supported on columns on large diameter CIDH piles. Responsibilities included:
reviewing contractor submittals (mixed designs, rebar shop drawings, prestressing tensioning reports, calculations, etc.), assisting with preparation of bridge CCOs, responding to bridge RFIs and onsite coordination between contractor and the designer.
City of Montclair, Central Avenue Project I Montclair, CA Construction Manager for the rehabilitation of Central Avenue, between Phillips Boulevard (southern City limit) and 1-10 (northern City limits). The project's objective is street rehabilitation, signal modifications, median landscaping/irrigation improvements, recycle water line and handicap accessibility upgrades.
R4
BIGGS CAFOOSA
ASSOCIATES INC
-
as3v1i At
-a Li -
YEARS OF EXPERIENCE
11 Years
YEARS WITH BIGGS
CARDOSA
6 Years
EDUCATION
MS, Civil Engineering
(Emphasis on Structures
and Foundation), Cleveland
State University
BS, Civil Engineering,
Parand Islamic Azad
University
CERTIFICATIONS
ACI Concrete Field -Testing
Technician, Grade 1
C. PROJECT TEAM ORGANIZATION
Ali Habibi
Structure Insp or 1100% Available
Ali has more than 10 years of experience performing construction management and engineering design. He is well versed in performing structural observation, labor compliance, construction inspection, as well as structural design for transportation and building structures. Ali's responsibilities include scheduling and coordinating staff meetings, preparing letters, reports, calendars, meeting agendas and notes, setting up project filing system, maintaining documents for all incoming and outgoing correspondence, monitoring insurance certificates and certified payroll, and processing submittals, RFIs, CCOs and requests for payment as well as performing civil and structural inspections, and utilizing SAP2000, SAFE & ETABS, Enercalc, AutoCAD, RISA 3D and Revit design programs.
EXPERIENCE
Orange County, OC Loop Carbon Creek Channel Segment D Bikeway Gap Closure 1 Orange County, CA
Construction Inspector/Assistant Structures Representative. This project constructed a 12'-14' wide Class I bikeway along Carbon Canyon Channel from La Floresta Drive to Bastanchury Road, connecting the La Floresta and El Cajon Trails.
Key features included steel sheet piles along the bikeway path, a 12'x12.5'x140' precast box culvert under Bastanchury Road, undercrossings at Golden Avenue, retaining walls, drainage, lighting, fencing, landscaping, ADA access, bicycle/pedestrian signals, and localized stormwater best management practices (BMP) to enhance connectivity and safety for cyclists and pedestrians. Ali's responsibilities on this project included organizing and leading weekly meetings, preparing correspondence, agendas, and notes, and maintaining the project filing system per Caltrans standards, Ali ensured compliance with project plans, structural requirements, and applicable codes, monitors contractor progress for quality and safety, tracks schedules and budgets, and facilitates communication among stakeholders. Additional duties included managing insurance certificates, certified payroll, environmental compliance, and processing submittals, RFIs, CCOs, and project closeout documentation.
City of Culver City, Higuera Street Bridge Replacement & Ballona Creek Bike Path Project (HBP) I Culver City, CA
Construction Inspector for replacement and constructing a new single span CIP bridge with pre -stressed concrete box girders and 24 -inch CIDH piles supported by seat abutments. Unique project features include new 70-footwide bridge, with two 12 -foot travel lanes, a 5 -foot bike lane, and a 6 -foot sidewalk in each direction. Field Inspection and Office Engineering responsibilities includes; Daily Inspection Reports and Photographic Records, Compliance Verification of QA/QC, Providing Technical and Engineering Support, Independent Field Measurements, Pay Applications, Field Inspections and Verifying Regulatory Compliance with Federal, State and Local Agency.
City of Oakland, 2021 On -Call Inspection & Testing Services 1 Oakland, CA Office Engineer for task orders issued under the City of Oakland's 2021 On -Call Inspection & Testing Services contract, supporting local roadway and public works development projects. Responsibilities included coordinating and tracking special inspections and materials testing during construction, including but not limited to earthwork compaction, AC placement, and reinforced concrete placement.
City of Oakland, Embarcadero Bridge Replacement over Lake Merritt Channel 1 Oakland, CA
Construction Inspector/Office Engineer for the replacement of the Embarcadero Bridge Replacement over Lake Merritt Channel. The project consists of the removal R5
EXPERIENCE CONTINUED
and disposal of the existing 500' long bridge and the construction of the new 535' long four -span CIP post -tensioned concrete box girder bridge supported on concrete columns with CIDH piling foundations, with bin type abutments comprised of precast prestressed concrete slabs supported by precast prestressed concrete piles. The project also includes construction of new drainage and stormwater treatment facilities, rock slope protection, landscape planting and irrigation, signing and striping, traffic detours, implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP) and other miscellaneous work.
City of Oakland, 23rd Avenue Overhead I Oakland, CA
Construction Inspector/Office Engineer for the Retrofit of a 658 -foot long, 4 -span CIP/PS T -beam bridge structure over UPRR facilities. The retrofit consists of column strengthening, footing overlays, end bent strengthening with 6 -foot diameter CIDH piles, and pipe restrainer retrofits.
R6
YEARS OF EXPERIENCE
36 Years
C. PROJECT TEAM ORGANIZATION
Robin Turner
Cultural Resource 1 25% Available
Robin has more than 36 years' experience in the Cultural/Paleontological Resource professions. She conducts Project Management and Construction Management services for cultural and paleontological resource mitigation operations for all sizes of construction projects. She is the main contact and construction coordinator for ArchaeoPaleo monitors/Technicians. She is the only business owner that is a professional archaeologist that is also a qualified paleontologist in the state of California.
EXPERIENCE
City of South Gate, Firestone Boulevard Regional Corridor Capacity Enhancements "The Boulevard Project" I South Gate, CA
Cultural Resource Lead for the improvement to a major gateway to the City.
To achieve this goal the number of traffic lanes have been increased from four to six lanes on Firestone Boulevard between Alameda Street and Hunt Avenue.
EDUCATION Improvements also included the synchronization of traffic signals, installation MA, Anthropology, of new street signage and construction of raised medians, curb and gutter, and California State University, asphalt paving.
Northridge
City of South Gate, Urban Orchard Project I South Gate, CA Cultural Resource Lead to construct a 30 -acre passive park along the Los Angeles River, located between the Los Angeles River, Firestone Boulevard, the Thunderbird Villa Mobile Home Park, and the 1-710 Freeway. The two primary purposes are to divert and treat storm water run-off from the Los Angeles River and provide recreation opportunities to South Gate residents by constructing a new passive public park.
Omnitrans, sbX E Street Bus Rapid Transit (BRT) On -Call I Ontario, CA Cultural Resource Lead. ArchaeoPaleo is providing provide cultural, archaeological, and paleontologic services for the sbX E street BRT Project that lies within several cities in Riverside County. This contract includes all work that requires cultural resource mitigation services. ArchaeoPaleo prepared the technical documents such as the Mitigation Monitoring Report Plan (MMRP) to amend monitoring areas not fully developed within the Environmental Impact Report and is currently conducting construction monitoring services to assure that all state and local requirements are met.
Metro Goldline, Eastside Extension Project, Expo Light Rail, and Orange Bus Line I Los Angeles, CA
Cultural Resource Lead. ArchaeoPaleo provided archaeological and paleontologic services for Metro projects throughout Los Angeles County. These projects includes the Gold Line Extension project, the Orange Bus Line, the EXPO ROW line, and any building or facilities work that requires cultural resource mitigation services.
ArchaeoPaleo prepared technical documents for Metro such as MMRP's and final Report of Findings documents for each of the Metro projects that were required as each project was completed. APRM performed all construction monitoring services for these contracts.
R7
'I'll.in
YEARS OF EXPERIENCE
4 Years
YEARS WITH TYLIN
2.5 Years
EDUCATION
MBA, Management,
California State University,
San Bernardino
BS, Structural Engineering,
University of California, San
Diego
CERTIFICATIONS
OSHA 30 -Hour
Construction Safety &
Health, # 21-602048238
Competent Person for
Trench & Excavation,
28649372
eRailSafe Certified,
#1043259
C. PROJECT TEAM ORGANIZATION
Abigail Manriquez
O%Available
Abigail is a dynamic professional with a unique blend of expertise in engineering and business administration that has consistently demonstrated a remarkable ability to excel in diverse roles. With a passion for innovation and a relentless pursuit of excellence, Abigail has carved a distinguished career path leaving a lasting impact on the projects she has undertaken. Abigail started her career working as an engineer for a heavy civil contractor. She has experience and knowledge of the Caltrans filing system, having worked as Office Engineer on HBP-funded projects.
EXPERIENCE
City of La Quinta, Dune Palms Road Bridge Improvement I La Quinta, CA Office Engineer. The Dune Palms Road Bridge Improvement Project is an extensive infrastructure undertaking that involves replacing an existing low water crossing with a 480 -foot long, 4 -span, CIP, PS concrete box girder bridge. This remarkable bridge, spanning over a vital waterway, will be 86 feet wide to accommodate four lanes of traffic, sidewalks, shoulders, and a raised median. The project is divided into two stages to keep Dune Palms Road open, with a closure pour planned later to connect the two bridge sections seamlessly. In addition to the bridge construction, the project includes various ancillary works such as the construction and removal of a bypass road, water main and sewer relocations, storm drain lines, catch basins, dry wells, channel slope paving, roadway improvements, sidewalks, driveways, curb and gutter, retaining walls, as well as the demolition of two mobile homes and one abandoned house with asbestos removal. As an Office Engineer, Abigail plays a critical role in inspecting construction procedures, ensuring adherence to contract specifications, coordinating stakeholders, managing project documentation, assisting in the submittal review process, preparing change orders, and meticulously tracking material inspection, certification, and acceptance. Her expertise and coordination are instrumental in delivering a successful project that enhances infrastructure and facilitates safer transportation for the community.
City of Escondido, Citracado Parkway Extension I Escondido, CA Office Engineer. The Citracado Parkway Extension Project encompasses the extension of the parkway by approximately 2,100 feet, providing four lanes of travel on an elevated roadbed. A significant aspect of the project involves the construction of a 260 -foot two -span, CIP, PS concrete box girder structure supported by a pier adjacent to the Escondido creek. Additionally, the project includes the construction of a 185 -foot soil nail wall and 4,200 feet of sound wall, supported on CIDH footings.
Existing roadway sections will be improved by reducing the median from 35 feet to 14 feet, resulting in a four -lane roadway, and the installation of two new signalized intersections. Adjacent surface streets and sidewalks will also undergo improvements.
As an Office Engineer, Abigail played a crucial role in logging and managing project submittals, RFIs, material test reports, and correspondence. She assisted in the submittal review process and meticulously track material inspection, certification, and acceptance, contributing to the project's smooth execution and adherence to quality standards.
R8
YEARS OF EXPERIENCE
13 Years
YEARS WITH TYI_IN
2 Years
EDUCATION
BA, Accounting, Baruch
College
C. PROJECT TEAM ORGANIZATION
Avraham Frank
Scheduler 1 25% Available
Avraham is an expert scheduler with extensive civil and mega project in transit, airport, bridge, roadway, utility, and wastewater knowledge and experience. He has extensive experience with Critical Path Method (CPM) scheduling, Primavera P6, resource allocation and planning, delay analysis and civil construction. Avraham also has experience on the civil side of a project valued at up to $3B, as well as with time location schedules for rail projects. He has a comprehensive understanding of civil traffic staging and scheduling to enable construction while maintaining active operations, and knowledge of major constraints that effect schedule, such as location and staging, installation of equipment and fiber lines, performing demo activities while maintaining operations, owner turnover milestones, franchise utility work around an active facility, and coordination with on-site contractors. Avraham has an expert level of knowledge and analysis of multiple critical paths that often exist in civil work that are occurring concurrently at an active facility.
EXPERIENCE
City of Norwalk, Firestone Boulevard Improvements I Norwalk, CA Senior Scheduler. The project will widen and reconstruct the asphalt pavement on Firestone Boulevard from Studebaker Road to Imperial Highway. Structural elements include various retaining walls and the widening of the bridge over the UPRR right of way. Concrete improvements include new sidewalk, curb and gutter, driveways, barriers, and access ramps. Review contractor's monthly update schedules, perform float path analysis, identify critical and near -critical action items, produce review report, and conduct schedule review meetings with Contractor to resolve scheduling issues. Review contract's time extension requests and claim.
City of Jurupa Valley, Jurupa Road Grade Separation Project I Jurupa Valley, CA Senior Scheduler. The project consists of constructing a railroad grade separation of the existing Union Pacific Railroad line at the crossing of existing Jurupa Road. The depression of Jurupa Road under the existing UPRR Mainline will result in lowering Felspar Street to the east of Jurupa Road. The project also includes grading of shoulders, roadway work, constructing detours, and any other required work. Review contractor's monthly update schedules, perform float path analysis, identify critical and near -critical action items, produce review report, and conduct schedule review meetings with the owner/contractor to resolve scheduling issues. Review contract's time extension requests and claim.
San Diego Airport Terminal 1 Redevelopment Program I San Diego, CA Scheduler. Reviewed the preliminary schedule and baseline schedule. Prepared the schedule review reports. Performed the project schedule analysis and CPM analysis.
Identified schedule risks and performed schedule risk analysis.
Southeastern Pennsylvania Transportation Authority Project Control and Claim Support I Pennsylvania
— Ardmore Transit Center Schedule and Claim Review
— Scheduling Management Procedure Development
— Scheduling Training Procedure Development
Metropolitan Transportation Authority (MTA), P36505 Rehabilitation of 5 CBHs (P36505)I Brooklyn, Manhattan, and Queens, NY
Reviewed the preliminary schedule and baseline schedule. Prepared the schedule review reports. Performed the project schedule analysis and CPM analysis. Identified schedule risks and performed schedule risk analysis.
R9
52 Engineering
11‘
YEARS OF EXPERIENCE
5 Years
YEARS WITH S2
1 Year
EDUCATION
BS, Civil Engineering,
California State University,
Fullerton
LICENSE
Professional Engineer,
California #C94679
C. PROJECT TEAM ORGANIZATION
Jacob Bailey, PE
Materials Sampling and Tering 1 25% Available
Jacob has extensive experience in laboratory QA/QC testing programs. With over four years of experience as Laboratory Manager, he has successfully overseen the testing of various roadway materials, including hot mix asphalt (HMA), PCC, soils and aggregates.
In his managerial role as the Laboratory Lead, Mr. Bailey has effectively supervised a team comprising of a minimum of 10 material engineering testers, alongside administrative and other engineering personnel. Jacob's responsibilities also consist of detailed review and approval of testing data, test reports, field inspection reports, and quality management plans. He is also responsible for the assessment and approval recommendation of concrete mix designs and asphalt job mix formulas for multiple PCC and HMA pavement projects. Part of this role requires thorough examination of laboratory batch test results, as well as the formulation of recommendations to enhance mix volumetrics. Jacob is also responsible for procuring and upholding Caltrans Laboratory certifications, including accreditation in additional areas. He has a thorough understanding of the Caltrans Standard Specifications related to roadway materials and actively trains tester personnel for the Joint Training and Certification Program, specific to HMA, PCC, soils, and aggregates.
EXPERIENCE
LA Metro,1-5 High -Occupancy Vehicle and Truck Lane Enhancement Project (PS67828) I Santa Clarita, CA
Quality Manager. Oversees the QA group consisting of 25 Engineers, Material Testers, and Inspectors that performed acceptance testing and inspection on a variety of materials, including but not limited to, HMA, PCC, masonry, as well as soils and aggregates. Jacob reviews materials submittals in accordance with Caltrans Standard Specifications as well as the Project Special Provisions to ensure the submittal package and materials are in compliance with the pertinent requirements.
He provides oversight and guidance to the Source Inspection team that travels to materials fabrication shops to inspect, tag, and release materials to the project site.
Jacob is also involved in drafting, reviewing, and issuing Nonconformance Reports to the Contractor for materials not in compliance with the contract requirements. Jacob is diligent in managing the operations of the QA team and consistently reviews the testing and inspection reports to ensure accuracy and timeliness. He takes an active role in managing the efforts of the QA team to ensure that all inspections, whether at the source or project site, materials, testing, and documentation are complete and accurate.
Caltrans, EA #125-0R8704 Route 05 I Orange County, CA
Material Engineer. Oversaw field and laboratory quality control operations, inspections, and testing. Reviewed daily inspection reports for both production and placement of HMA. Reviewed HMA quality control summary reports and provided engineering recommendations for the Contractor for test results outside of the allowable tolerances. Coordinated with the laboratory and engineering team to ensure minimum testing frequencies were met. Ensured compliance with the Caltrans Standard Specifications 2018, the Project Special Provisions, and the Revised Standard Specifications published at the time.
R10
'rain
YEARS OF EXPERIENCE
11 Years
YEARS WITH TYLIN
<1 Year
EDUCATION
BS, Civil and Construction,
Queensland University of
Technology, Brisbane City,
QLD
CERTIFICATIONS
Construction Manager in
Training
Engineer in Training,
#179653
C. PROJECT TEAM ORGANIZATION
Bruce Fock-Yat, CMIT, EIT
As -Needed upplerrie acajvisp c c 75% Available
Bruce has 11 years of experience in civil engineering within the construction industry. During this time, he has had an opportunity to oversee complex municipal infrastructure projects including bridges, street improvements, highways, slope stabilization, road pavements, retaining wall, stormwater, and sewer systems developments. Bruce has been actively involved in performing QC, development of construction procedures and project plans, conducting daily inspections, monthly progress claims, management of the project team, and liaison to client's representatives.
EXPERIENCE
City of South Gate, Residential Resurfacing City -Wide Project I South Gate, CA
Construction Inspector for the citywide improvements project, enhancing the accessibility throughout the neighborhoods that surround the community. These improvements include pavement resurfacing and water main replacement of several streets. The resurfacing project includes pavement rehabilitations, removal and replacement of ADA ramps, rehabilitation of cross gutters, curbs and gutters and sidewalks, adjust to grade manholes and values, speedbumps, street signs and striping. Driveway approaches and ADA access ramps are constructed with approved transitions to adjacent AC pavements and all other existing items adjacent to the City's improvement.
Culver City, Higuera Street Bridge Replacement and Ballona Creek Bike Path Connectivity Improvements (HBP) I Culver City, CA
Construction Inspector for the replacement of a new single span CIP bridge with PS concrete box girders, 24 -inch CIDH piles supported by seat abutments, bridge wingwalls supported on engineering fill and CIDH. This project also included the construction of two cantilevered retaining walls, both being 421LF and 261.6LF.
Responsible for Daily Inspection Reports and Photographic Records, Compliance Verification of QC and QA, Providing Technical and Engineering Support, Independent Field Measurements, Pay Applications, Field Inspections and Verifying Regulatory Compliance with Federal, State and Local Agency.
Rancho Santa Margarita City, Santa Margarita Parkway Hinge Repair Project (HBP) I Rancho Santa Margarita, CA
Construction Structural inspector for the 72 -foot -wide northern bridge which encompasses a full hinge demolition and replacement, and includes replacement of the joint seal, and assemblies and joint sidewalk armor at each abutment. The project also consists of the Installation of the CIDH piles, hinge replacement, installation of falsework, jacking, grinding the surfaces of the bridge, removal of the damaged joint seal and installation of the new joint sealant and resurfacing. All inspection services have been performed in strict accordance with the latest Caltrans LAPM, OSC technical manuals, Highway Design Manual, Construction Manual, Caltrans Standard Specifications, and City Standards.
R11
7 BIGGS CAROOSA
ASSOCIATES INC
YEARS OF EXPERIEiy
10 Years
YEARS WITH BIGGS
CARDOSA
10 Years
CE
EDUCATION
MS, Civil Engineering,
California State University,
Fullerton
BS, Civil Engineering,
California State University,
Fullerton
LICENSE
Professional Engineer,
California #C96813
C. PROJECT TEAM ORGANIZATION
Lauren Herbert, PE
m...;,-Jekici Supplemental Inspector 1 60% Available
Since joining Biggs Cardosa, Lauren has worked in Project Engineer/Labor Compliance capacities on various transportation projects including bridges, roadways, and grade separations. Her responsibilities include setting up and maintaining the project filing system, coordination with all parties involved in the project, meeting minutes, agendas, and ability to run meetings, review and respond to submittals, and RFIs, write change orders while maintaining a change order and change order request log, analysis of project schedule and budget, labor compliance, and verification of prevailing wage laws and regulations, process progress payments, monitoring insurance certificates and certified payroll, provide necessary project documentation, and implementation of documents and checklists created to keep the job running on time and on schedule.
EXPERIENCE
City of San Bernardino, Mount Vernon Viaduct Replacement Project I San Bernardino, CA
Office Engineer for the design -build bridge replacement over BNSF inter -modal yard, BNSF mainline tracks, and Southern California Regional Rail Authority (SCRRA) mainline tracks. Responsibilities include close coordination with both BNSF, and SCRRA for the demolition of the existing bridge and replacement of proposed bridge over their tracks, and coordination with BNSF for a mitigation project to construct shooflies required for the construction of the proposed Mount Vernon bridge. Other responsibilities include overall meeting coordination, submittals, RFIs, change orders, pay estimates, agendas, minutes, document control and management, setting up filing systems, invoicing, and other project needs. In addition, also assists in the coordination between the internal PCM Team, regarding design, schedules, budget, and technical provisions.
City of South Gate, Firestone Boulevard Regional Corridor Enhancements Project I South Gate, CA
Construction Inspector for the construction of the street enhancement project. The project consists of several improvements such as increasing the number of traffic lanes from four to six lanes on Firestone Boulevard, synchronization of traffic signal, new street signage, and construction of raised median, curb and gutter and asphalt paving. Other responsibilities included reviewing and responding to submittals, RFIs, and miscellaneous communication with different team members throughout the project.
LA Metro, Rosecrans/Marquardt Grade Separation I Santa Fe Springs, CA Assistant Engineer. Developed quantities, cost estimates, and text for an Alternatives Development Report, which was used as the basis for selecting a project alternative.
Performed design calculations and developed a three-dimensional finite element model for a three -span, 578 -foot long precast, prestressed concrete spliced "wide flange" girder alternative. Coordinated the development of the structural contract drawings for the bridge and retaining walls.
R12
D. Project Ex
oerience
Firestone Boulevard Widening Project
CONTRACT DATES
04/2024 -12/2025 (est.)
OBJECTIVE
The Firestone Boulevard is to be widened to
accommodate three travel lanes in each direction, with
Class II bike lanes and 8 -foot sidewalks in each direction.
The added lane will require widening of the existing
bridge over the UPRR Spur tracks, reducing the current
raised median width, and constructing retaining walls
to accommodate the steep embankments. Existing turn
lanes will be maintained, drainage will be modified as
required, traffic signals will be upgraded along with
street and bridge lighting. Project wide landscaping
improvements and complete repaving of Firestone
Boulevard will result in a fresh and upgraded look to this historic regional thoroughfare.
DESCRIPTION
TYLin is providing full CM services and realizes the
severity of the impacts construction may have on the
schedule due to the railroad and will adhere to the
guidelines set forth in the contract documents.
OUTCOME
Project is tracking on schedule and within the budget contingency. Girders have been erected safely and the community is extremely satisfied with the added lane in each direction.
"ONTRACT AMOUNT
$1.4M
iUDING SOURCE
LA Metro
CONTRACTING
AGENCY
City of Norwalk
AGENCY PM
Mario Mera
Engineering Division
Manager
[email protected]
562.929.5348
CONSULTANT PM
Mazen Mneimneh
Project Manager
maze n.mneimneh@
tylin.com
949.268.5424
D. PROJECT EXPERIENCE
North Atwater Non -Motorized Multimodal Bridge
CONTRACT DATES
07/2017 - 09/2020
OBJECTIVE
A symbol of achievement for the Los Angeles River
Revitalization Plan, the signature cable -stayed bridge connects the rapidly growing Atwater Village on the
east bank to the Los Angeles River Bike Path on the west bank and provides access to the extensive Griffith Park trail network.
DESCRIPTION
TYLin served as the Prime Consultant, providing
construction engineering with significant design
support during construction of this new non -motorized
multimodal bridge project as a task order under an on-
call contract with the Los Angeles Bridge Improvement
Division. TYLin responded by providing effective cost
controls and sound, buildable construction plans
without disrupting the contractor's schedule.
OUTCOME
Construction was completed on time and
within budget.
► TYLin 1 Golden Avenue Bridge Rehabilitation
u RAC AMOUNT
$2M
a _. wDING SOURCE
Local
CONTRACTING
AGENCY
City of Los Angeles
AGENCY PM
Shirley Lau
Executive Officer
Bureau of Street
Services
[email protected]
213.847.3333
CONSULTANT PM
Joseph Smith
Vice President
joseph.smith@
tylin.com
619.908.3306
6 D. PROJECT EXPERIENCE
Cathedral Canyon Drive Low -Water Crossing Replacement
CONTRACT DATES
06/2020 - 05/2022
OBJECTIVE
The low-water crossing replacement and channel
improvements are located along the Cathedral Canyon
Drive at the Whitewater River between Paseo Azulejo
Drive and Canyon Shores Drive. In general, the work
consisted of replacing the existing low water crossing
with a new 600' CIP/PS box girder bridge, 12' CV
Link multi-purpose trail, roadway modifications, ADA
compliant sidewalks and ramps, raised stamped
concrete median, landscaping and irrigation, drainage
improvements, sewer force main relocation, and
concrete channel lining improvements.
DESCRIPTION
TYLin served as the prime consultant providing
construction management and inspection services,
managed multiple subconsultants who are performing
Material Testing, Environmental and Biological
Monitoring, SWPPP Monitoring and Inspection, Material
Source Inspection, Electrical Inspection, and Labor
Compliance and DBE Conformance.
OUTCOME
Construction was completed on time and within budget.
CONTRACT AMOUNT
$19M
FUNDING SOURCE
HBP
CONTRACTING
AGENCY
City of Cathedral City
AGENCY PM
John A. Corella
Director of Engineering/
Public Works
jcorella@
cathedralcity.gov
760.770.0327
CONSULTANT PM
Joseph Smith
Vice President
joseph.smith@
tylin.com
619.908.3306
1-5/Jeffrey Open Space Trail (JOST) Pedestrian and Bicycle Bridge
CONTRACT DATES
01/2024 - Ongoing
OBJECTIVE
The project consists of an elevated pedestrian bridge
from the Cypress Village Trail, over the northbound 1-5 Jeffrey Road off -ramp and mainline 1-5 lanes, Caltrans park and ride lot, Walnut Avenue, and finally touching
down south of the Jeffrey Road/Walnut Avenue
Intersection. The existing JOST system currently ends
just north of the I-5/Jeffrey Road Interchange, where
it connects to the Cypress Village trail. The southern
terminus of the project is just south of the Jeffrey Road/ Walnut Avenue Intersection.
DESCRIPTION
As the Prime Consultant, TYLin is providing the Resident Engineering, Office Engineer and Structures/Civil
Inspector for this project that will close a gap in the City's trail system.
OUTCOME
This project is ongoing but is anticipated to be
completed on time and within budget.
► TYLin I Golden Avenue Bridge Rehabilitation
CONTRACT AMOUNT
$3M
FUNDING SOURCE
Federal and Local
CONTRACTING
AGENCY
City of Irvine
AGENCY PM
Anthony Caraveo
Senior Project Manager
acaraveo@
cityofirvine.org
949.724.7555
CONSULTANT PM
Joseph Smith
Vice President
joseph.smith@
tylin.com
619.908.3306
7 Dune Palms Road Bridge Improvement Project
u'GA �S
01/2023 - 07/2025
OBJECTIVE
The new bridge is 86 feet wide to accommodate four
lanes of traffic, six -foot -wide sidewalks, eight -foot -wide shoulders, and a 10- foot raised median. Project work
also included construction and removal of a bypass
road, CVWD water main and sewer relocations with
sewer bypass, storm drain lines, catch basins and dry
wells, channel slope paving, new AC roadway, sidewalks, driveways and curb and gutter and retaining walls. The
project also included demolition of two mobile homes
and one abandoned house and asbestos removal.
DESCRIPTION
TYLin provided construction management to the City of
La Quinta to replace the existing low water crossing with a 480 -foot -long, 4 -span, CIP, pre -stressed concrete box girder bridge. The bridge was constructed in two stages to keep Dune Palms Road open, with a closure pour later to connect the two bridges. The bridge improvements
provide easier access for motorists, pedestrians, and
cyclists, as Dune Palms Road is frequently used by high school students, mobile home park residents, and the skate park in the immediate area.
CONTRACT AJIOUN 1
$2.8M
FUNDING SOURCE
Federal and Local
CONTRACTING
AGENCY
City of La Quinta
AGENCY PM
Bryan McKinney
City Engineer
City of La Quinta
bmckinney@
la-quinta.org
760.777.7045
CONSULTANT PM
Joseph Smith
Vice President
joseph.smith@
tylin.com
619.908.3306
OUTCOME
Project was delayed due to damage sustained by Hurricane Hilary. CM and Contractor mitigated delay as best as possible by eliminating reconstruction of the bypass road and a subsequent traffic switch.
Willow Street Bridge Replacement
CONTRACT DATES
07/2017 - 05/2019
OBJECTIVE
The purpose of the project was the replacement of a
27 span slab bridge over the Sweetwater River. The
new structure is a wider, 5 span, CIP/PS box girder
bridge, which was constructed in two stages. The new
bridge is 83 feet wide and 620 feet long and includes
sidewalks and bicycle lanes on both sides. The project
also included upgrades to the drainage system by
constructing a 650 foot -long double box culvert placed under the existing roadway in stages with multiple inlets, revisions to two busy intersections, a new multi -use
pedestrian and equestrian path, new pavement, curb
and sidewalk, permeable pavement, and biofiltration
inlets were included with this work.
DESCRIPTION
TYLin provided construction management, engineering,
and inspection services, managing a team of nine
subconsultants providing services including material
testing, surveying, environmental monitoring, labor compliance monitoring, and various specialty inspection services. Construction of the bridge required special attention by the Contractor and construction management team, as the design called for variable depth end spans and constant depth intermediate spans.
OUTCOME
Completed on time and within budget with zero claims, despite multiple differing site conditions and impacts from unexpected endangered species at the site. This project was audited multiple times by Caltrans and FHWA and had no findings.
CONTRACT AMOUNT
$1.6M
FUNDING SOURCE
Federal and Local
CONTRACTING
AGENCY
City of Chula Vista
AGENCY PM
Gregory Tscherch
Senior Civil Engineer
gtscherch@
chulavistaca.gov
619.409.1974
CONSULTANT PM
Wade Durant
Deputy Sector Manager
wade.durant@
tylin.com
619.908.3216
► TYLin I Golden Avenue Bridge Rehabilitation
D. PROJECT EXPERIENCE
8 D. PROJECT EXPERIENCE
Higuera Street Bridge Replacement and Ballona Creek Bike Path Connectivity Project
CONTRACT DATES
2020 - 2023
OBJECTIVE
Replacement of the bridge at Higuera Street.
DESCRIPTION
The City of Culver City, in cooperation with Caltrans,
replaced the 82 -years old structurally deficient bridge and widen the existing Higuera Street Bridge over
Ballona Creek. The project consisted of demolition
of the existing bridge, construction of a single
span prestressed concrete box girder bridge and a
connection ramp to the bike path. The new bridge is
70 feet wide and has four travel lanes, two bicycle
lanes, five-foot wide sidewalks, and an observation
deck. Portions of the projects lie within the City of
Los Angeles jurisdiction and USACE right-of-way.
Biggs Cardosa provided construction management
services, in addition to inspection, scheduling/claim
analysis, labor compliance, and construction contract
administration.
OUTCOME
Biggs Cardosa's scope of work was completed on time
and within budget.
Orange County (OC) Loop
CONTRACT DATES
2024-2025
OBJECTIVE
Segment D of the OC Loop bikeway path is a 1.1 -mile
project that includes installing sheet piles, a box culvert, retaining walls, and the bikeway itself. Its objective
is to close a critical gap in the trail system, improving connectivity, mobility, and community access.
DESCRIPTION
Construction Management support for the County
of Orange to prepare and document construction
records in accordance with Caltrans standards,
including handling submittals, RFIs, processing progress payments, coordinating meetings, and related tasks.
Biggs Cardosa's responsibilities include organizing and leading weekly meetings, preparing correspondence and
documentation in accordance with Caltrans standards,
monitoring contractor progress for quality and safety,
tracking schedules and budgets, and facilitating
communication among stakeholders. The team also
manages certified payroll, environmental compliance,
and processes submittals, RFIs, CCOs, progress payment applications, and project closeout documentation.
CONTRACT AMOUNT
$1.4M
FUNDING SOURCE
HBP
CONTRACTING
AGENCY
City of Culver City
AGENCY PM
Sammy Romo
Senior Civil Engineer
Sammy.romo@
culvercity.org
310.253.5619
CONSULTANT PM
Mazen Mneimneh *
Project Manager
mazen.mneimneh@
tylin.com
949.268.5424
*Previously with Biggs
Cardoso
CONTRACT AMOUNT
$400k
FUNDING SOURCE
Caltrans BCIP and SB -1
CONTRACTING
AGENCY
Orange County Public
Works (OCPW)
AGENCY PM
TJ Areopagita, PE
Senior Civil Engineer
teejay.areopagita@
ocpw.ocgov.com
714.856.2099
CONSULTANT PM
Ron Oen, PE, QSD
Principal
Roen@
biggscardosa.com
408.550.8566
OUTCOME
The project is currently under construction and is anticipated to be completed by the end of November 2025.
► TYLin I Golden Avenue Bridge Rehabilitation
9 Firestone Boulevard Bridge Replacement over
the San Gabriel River
CONTRACT DATE')
2011- 2015
OBJECTIVE
Replacement of Firestone Boulevard Bridge.
DESCRIPTION
Biggs Cardosa designed and provided design
engineering, construction support, construction
management support and inspection services for the
Firestone Boulevard Bridge in Norwalk.
Biggs Cardosa was selected as prime consultant
and structural engineer to design an HBP-funded
replacement for the Firestone Boulevard Bridge that
connects the City of Norwalk with the City of Downey,
California. The replacement bridge is a 239 -foot long, three -span structure carrying six traffic lanes and
concrete sidewalks over the San Gabriel River. The bridge is constructed of precast concrete girders, supported on pier walls and drilled concrete piles.
Biggs Cardosa led a very successful coordination with
the USACE, LACFCD, CDFW, and RWQCB to design,
environmentally clear, secure all permits, acquire all
right-of-way, relocated all utilities and advertised this project in under three years.
CONTRACT AMOUNT
52.5M
FUNDING SOURCE
HBP
CONTRACTING
AGENCY
City of Norwalk
AGENCY PM
Randy Hillman
City Project Manager
rhillman@
norwalkca.gov
562.929.5719
CONSULTANT PM
Mazen Mneimneh *
Project Manager
mazen.mneimneh@
tylin.com
949.268.5424
*Previously with Biggs
Cardosa
D. PROJECT EXPERIENCE
Biggs Cardosa also provided Construction Management Support, Structures Representative and Inspection services to help the City meet the aggressive and constrained river -construction window. The Interim Construction Management & Inspection team was responsible for the development, implementation and execution of the construction management and quality assurance plan (QAP) and protocols per FHWA funding requirements; establishing a document filing system, performing construction meetings and video/ photographic condition surveys, confirming the contractor's labor compliance interviews, reviewing the contractor's baseline schedule, coordinating 3rd party utility designs and stakeholder interests/requirements, reviewing and monitoring the contractor's SWPPP, establishing and performing the environmental mitigation and monitoring, performing the QC survey activities, and performing geotechnical and structural bridge inspections. Once the construction management and QAP and protocols had been established and the City retained a full-time Resident Engineer for the project, Biggs Cardosa continued as the structures lead providing on-site structure representation inspection and construction support services including processing, reviewing, and responding to contractor submittals and RFIs. This project received the 2016 American Council of Civil Engineering Companies California Honor Award for Engineering Excellence.
OUTCOME
Biggs Cardosa's scope of work was completed on time and within budget.
I would like to take this opportunity to express my sincere appreciation for Mr. Mazen Mneimneh of your staff on his extraordinary performance for the Firestone Bridge Replacement...in implementing the construction administration phase. This type of knowledge and courteous assistance is certainly a valuable asset to BCA, Caltrans, and all other participating Cities...
MAZEN DABBOUSSI I CALTRANS LOCAL ASSISTANCE
CITY OF NORWALK FIRESTONE BOULEVARD BRIDGE REPLACEMENT OVER THE SAN GABRIEL RIVER ► TYLin I Golden Avenue Bridge Rehabilitation 10
D. PROJECT EXPERIENCE
Firestone Boulevard Bridge Widening Over the Los Angeles River
CONTRACT DATES
2016 - 2017
OBJECTIVE
The existing bridge is a four -span 473 -foot long structure with 3 -lanes in each direction, carrying the east -west traffic along Firestone Blvd. over the Los Angeles River.
To improve mobility and increase safety, the south
widening of the bridge constituted the first of a two-
phase project which added a dedicated right turn lane
and a shoulder from Rayo to the 1-710 SB on-ramp.
DESCRIPTION
BCA with Mazen Mneimneh, PE, QSD, serving as the
Resident Engineer and Structure Representative, along
with his structural inspection team, provided critical
Construction Management and Inspection services.
Their efforts were instrumental in helping the City meet the project's aggressive and environmentally constrained in -river construction window. They verified compliance with Caltrans' LAPM, Standard Specifications, and
environmental regulations under the USACE Section
408 permit, managing all channel access and seasonal
restrictions within Los Angeles River.
OUTCOME
Project was completed on time and under budget.
l TRACT AMOUNT
$1.5M
FUNDING SOURCE
HBP
CONTRACTING
AGENCY
City of South Gate
AGENCY PM
Clint Herrera
POLB Director of
Engineering Design
(Formerly with City of
South Gate)
[email protected]
562.283.7874
CONSULTANT PM
Mazen Mneimneh *
Project Manager
mazen.mneimneh@
tylin.com
949.268.5424
*Previously with Biggs
Cardoso
► TYLin I Golden Avenue Bridge Rehabilitation 11
D. PROJECT EXPERIENCE
References
The following references can speak to the reputation of TYLin and our Resident Engineer/Structures Representative.
TYLin References
Firm/Agency
Project
Name + Title
Address
Phone + Email
City of
Norwalk
City of
Los Angeles
City of
La Quinta
Firestone Boulevard
Widening Project
North Atwater
Non -Motorized
Multimodal Bridge
Dune Palms Road
Bridge Improvement
Project
Mario Mera
Engineering Division
Manager
Shirley Lau
Principal Civil Engineer
Brian McKinney
City Engineer
Mazen Mneimneh References
12700 Norwalk
Boulevard
Norwalk, CA 90650
1149 South Broadway,
Suite 750
Los Angeles, CA 90015
78-495 Calle Tampico
La Quinta, CA 92253
562.929.5348
[email protected]
213.485.5228
[email protected]
760.777.7045
bmckinney@
la-quinta.org
Firm/Agency
Project
Name + Title
Address
Phone + Email
Port of Long
Beach
Caltrans Local
Assistance - D7
Culver City
Public Works
Department
Firestone Boulevard
Bridge Widening over
Los Angeles River
"The Boulevard"
Firestone Boulevard
Regional Corridor
Enhancements
Norwalk Firestone
Boulevard Bridge
Replacement over
the San Gabriel River
(HBP)
Higuera Street Bridge
Replacement and
Ballona Creek Bike
Path Connectivity
Improvements
Clint Herrera
Director of Engineering
Design
Mazen Dabboussi
Local Assistance Area
Engineer
Sammy Romo
Senior Civil Engineer
415 W. Ocean Blvd., 626.384.0945
Long Beach, CA 90802 clint.herrera@
polb.com
100 South Main Street,
12th Floor
Los Angeles, CA 90012
9770 Culver Boulevard
Culver City, CA 90232
213.897.2939
mazen.a.dabboussi@
dot.ca.gov
310.253.5619
sammy.romo@
culvercity.org
► TYLin I Golden Avenue Bridge Rehabilitation 12
E. FINANCIAL CAPACITY
E. Financial Capacity
TYLin, a California Corporation, has been in business since 1954 and has experienced steady growth and financial stability throughout its history. The firm reported $832 million in revenue for 2024 and has strong banking relationships and the ability to access a line of credit, if required, to meet operating cash needs. TYLin has no planned office closures, mergers, or pending litigation that would affect delivery of this project for the City.
Elements that best demonstrate the firm's financial responsibility are described below:
— Accounting System: TYLin utilizes Deltek Vision for a fully integrated General Ledger and Project Cost Accounting system. Deltek Vision is one of the industry -standard accounting softwares. TYLin has been using Vision for many years now, and our project managers and accounting staff are well versed in its use. — Compliance with GAAP and FAR: TYLin's financial statements are kept in accordance with Generally Accepted Accounting Principles (GAAP). The accounting system allows costs to be accurately segregated by client and by contract and accumulated as per Federal Acquisition Regulations (FAR) requirements. — Independent CPA Audit: TYLin undergoes an independent Certified Public Accountant (CPA) audit annually. Deloitte is currently our independent auditor, and brings a high level of credibility to the audit. This process also includes annual verification of our indirect cost rate for purposes of government contracting. — Government Agency Audits: TYLin does an extensive amount of work with government agencies ranging from various federal departments to state DOTs and local agencies. Our government -audited overhead rate is typically the same as, or very close to, our stated overhead rate as determined by our independent CPA. This is indicative of the careful accounting practices and procedures that are in place to verify that the company is consistently following GAAP and FAR.
— Record Keeping: TYLin implements strict record keeping procedures to ensure that costs are verifiable. Timesheets are electronic and any changes are well documented. Receipts for all expenses are kept and included in the project files. timesheets and receipts are provided for invoices in accordance with requirements for cost -recoverable tasks.
TYLin I Golden Avenue Bridge Rehabilitation 13
F. Project Uncerstanc
anc Approach
Teaming Partnership
TYLin, in partnership with Biggs Cardosa, understands the City's requirements for the Project. Replacing the Golden Avenue Bridge at Carbon Canyon Channel is a critical
investment for the City that requires disciplined oversight, proactive management, and seamless coordination to result in successful delivery. TYLin and Biggs Cardosa together provide the professional qualifications, licensure, technical resources, and proven track record necessary to manage
this federally funded project in full compliance with City, Caltrans, and FHWA requirements. Our understanding is
that this project is programmed under HBP, which utilizes federal funds and is therefore subject to all applicable federal requirements, including DBE participation and Buy America provisions, and will be overseen and audited by Caltrans for compliance. Backed by advanced technical
capabilities and modern management tools, our team
offers comprehensive construction management services
including contract administration, inspection, QA, and
stakeholder communication. Our objective is to act as
an extension of City staff by protecting public interests, minimizing risks, and delivering a project that meets the highest standards of safety, quality, and accountability.
This partnership is further strengthened by Biggs Cardosa's unique role as the prime design engineer for the Golden Avenue Bridge Replacement Project and its active
involvement on the construction management team for
the adjacent OC Loop Segment D project, which directly
connects to the bridge. The Golden Avenue Bridge therefore plays a dual role: serving as essential infrastructure while also completing a critical link in the OC Loop trail system to improve regional connectivity, community access, and safety for pedestrians and cyclists.
TYLin is fully aware of the potential conflict of interest concerns that may arise when a design firm is also engaged in construction management services. In such cases, the actual conflict arises when the designer is responsible for evaluating and responding to construction claims,
particularly those related to errors or omissions in the bid documents. This can create a bias toward denying the
legitimacy of such claims, compromising the objectivity of the process.
To eliminate this potential conflict and ensure full
compliance with applicable City and federal procurement guidelines, TYLin has structured the team to maintain clear separation between design and construction oversight.
TYLin will serve as the prime Construction Management
consultant, with direct responsibility for Resident
F. PROJECT UNDERSTANDING AND APPROACH
In
g
Engineering services. This includes independently assessing contractor change orders and claims and acting as the City's safeguard to verify fair and unbiased evaluations. TYLin has no commercial or contractual interest in the original design, and our sole focus is on delivering objective, high-quality construction management services.
Biggs Cardosa, the original designer, will be engaged
strictly in a technical support capacity, limited to field inspection services and QA. They will not be involved in any commercial decision-making, including the evaluation of claims, CCOs, or cost -related matters. All communication with Biggs Cardosa will be routed through TYLin's Resident Engineer, ensuring a controlled and transparent flow of information that reinforces TYLin's role as the independent authority in the field.
Importantly, having Biggs Cardosa on our team provides
a significant technical benefit. Their familiarity with the design allows for rapid responses to field issues, minimizing delays and ensuring continuity between design intent
and construction execution. Their proximity within our
team enables quick turnaround on technical clarifications, minimizing delays—without compromising the objectivity of construction oversight.
This organizational structure functions as a "firewall" between design and construction, preserving impartiality while leveraging technical expertise. It certifies that the City benefits from informed support without sacrificing transparency or accountability, and that the project is delivered on time, within budget, and to the highest
professional standards.
► TYLin I Golden Avenue Bridge Rehabilitation 14
Technical Approach
Our understanding is that the Project will replace the
existing 26 -foot -wide bridge over Carbon Canyon Channel with a new 60 -foot -4 -inch -wide structure designed
to improve safety, mobility, and connectivity. The new
bridge will provide two 12 -foot travel lanes and 6 -foot - wide sidewalks on both the south and north sides of
the structure. The superstructure will consist of PC/
PS CA 154 girders and will incorporate a Type 732SW
(Modified) barrier to meet current safety standards. It is also designed to accommodate six telecommunications
conduits, a 4 -inch gas line, six conduits for Southern California Edison (SCE), and a 16 -inch casing for a future waterline. The substructure will be composed of abutments with a thickness of 3'-6", supported on 2'-6" CIDH piles.
In addition, our understanding is that this project also completes the OC Loop Segment D from Station 21+00 to
29+00, which runs directly under the bridge, making it a critical Zink for regional trail connectivity.
A defining feature of the project is the incorporation of custom-designed precast decorative fascia panels, which we recognize as a construction critical and sensitive
elements of the bridge that could impact the construction schedule and quality if the fabrication and erection is F. PROJECT UNDERSTANDING AND APPROACH
mismanaged. These panels were developed specifically for this project and must be constructed and installed with absolute precision. Exact clearances must be maintained as detailed in the plans, as even minor deviations could create misalignment during installation or lead to long-term performance issues such as creep or displacement. Because of their unique design and structural integration, the fascia panels require comprehensive and disciplined QC, careful inspection, and proactive coordination with the contractor.
This feature represents a high-risk element where effective construction management will be essential to safeguard
the City's investment, preserve the intended design, and avoid costly rework, construction delays and/or future
maintenance challenges.
Our understanding is that the bridge is located very close to property lines on the northeast and southwest quadrants, making it vital to implement vibratory monitoring, noise monitoring, and geotechnical stability monitoring to avoid potential damage to adjacent properties and protect the City from potential post -construction claims from these property owners. We also understand that an existing gas line on the northeast side will require coordination and relocation prior to bridge removal. At Abutment 1, conflicts exist with sheet piles RW2A on the northwest corner
and RW3A on the southwest corner, requiring careful
coordination and partial demolition to allow construction.
Because Biggs Cardosa participated as part of the
CM team on the OC Loop Segment D project, which
connects directly to this bridge, our team is familiar
with the existing conditions. This background helps us
anticipate key aspects of the partial sheet pile removal and associated construction activities, supporting an
efficient and well -coordinated project delivery while
minimizing risks and delays.
The overall project scope also includes demolition of the existing bridge, excavation and earthwork, new drainage and storm drain facilities, slope stabilization, utility relocations, concrete flatwork, paving, traffic control, and safety enhancements. Construction is expected to
be completed within 120 working days from NTP, with
liquidated damages of $4,200 per working day for delays.
Existing Golden Ave. Adjacent property on
Br', to bf, lined the sol,“- -st corner
► TYLin I Golden Avenue Bridge Rehabilitation
15 F. PROJECT UNDERSTANDING AND APPROACH
IlirlllllpF�! Illliflt� 11111
\. 1
;. A ming cortiict
w4V Ine new IY dgi
i
Our understanding is that, as a federally funded project, it will require strict compliance with Caltrans standards, LAPM, prevailing wage requirements, and DIR monitoring.
If selected, our team will provide the full range of CM and inspection services including pre -construction coordination, contractor schedule review and monitoring, field
measurements of quantities, pay request review, inspection and QA, labor compliance, traffic control review, jobsite safety oversight, and facilitation of communication with City staff. Our understanding is that laboratory and/or testing services will also be required for project materials, which will be performed by our certified subconsultant S2 as part of our comprehensive quality assurance program.
Key Issue Challenges
Residences located on the northeast and
southwest quadrants are very close to
the project site, creating a risk of noise
disturbance, vibration impacts, and
potential soil instability during excavation
and construction.
Excavation and
Vibration Monitoring
Golden Ave.
Bridge
widen ng
PRIMARY PROJECT CONCERNS AND ADVANCED
TECHNIQUES
We are committed to assisting the City in meeting its overall objectives in this construction contract. In our review of the plans and specifications. our team foresees challenges that will require focused pre -planning and attention to avoid significant delay and ensure the success and timely completion of the project. Some are listed below and on the following page for your consideration:
Mitigations and Opportunities
Implement noise, vibration, and soil stability
monitoring with real-time alerts to protect
nearby residences and reduce risk of damage
or claims. Meet with owners to address
their concerns.
► TYLin I Golden Avenue Bridge Rehabilitation 16
Key Issue
Detour Plan
PC/PS Girders
Conflicts at Abutment
1 with Sheet Piles
RW2A (NW corner) +
RW3A (SW corner)
Bike Path
Bridge Demolition
and Channel Fence
Protection
CIDH Pile Installation
Challenges
Detour routes require approval from the
City of Yorba Linda, which may impact
schedule if not coordinated early.
I -Girders are harder to get and more
expensive than Wide Flange (WF) girders;
the design is tied to decisions and details
established with the Type Selection over
10 years ago.
Existing sheet piles interfere with
the construction of Abutment 1,
requiring partial demolition and careful
coordination to avoid delays and
structural complications.
Keeping the Bike Path open during
construction.
The bridge must be removed without
damaging the channel fence, and the
channel must remain protected during
demolition, requiring coordination with
USACE and LACFCD.
Groundwater may be present during
drilling, which could require dewatering to
properly install the piles.
The deck will be poured on site, but
Deck and PC/PS Girder girders must be inspected at the precast Source Inspection plant; quality concerns if contractor's QC is inadequate.
Fascia Panel
Connection
The precast decorative fascia is custom
designed for this bridge and must be
installed with precise clearances. Any
misalignment could constructability
issues and/or create long-term
maintenance issues such as creep
or displacement.
F. PROJECT UNDERSTANDING AND APPROACH
Mitigations and Opportunities
Coordinate all traffic control plans with
Yorba Linda in advance, maintain clear
communication, and use this as an opportunity
to strengthen interagency collaboration.
The contractor may propose a Value
Engineering Change Proposal to change to WF
girders and lower costs. However, the design
and architectural facia details would need
careful review to assure constructability and
actual cost savings.
Leverage Biggs Cardosa's firsthand experience
from the OC Loop Segment D project to manage
partial sheet pile removal at RW2A and RW3A
efficiently, coordinating closely with OCPW
and the contractor to minimize risks and
maintain progress.
Implement a comprehensive safety and traffic
control plan, including wayfinding maps for
alternate routes, advance notifications and
alerts, flaggers at either end of the bridge to
manage bike traffic and limiting path closures
strictly to unsafe operations (Girder Erection,
Deck pour, etc,). These measures ensured
that the bike path construction progressed
efficiently while prioritizing the safety of both
cyclists and construction personnel.
Require the contractor to include cover and
protection measures for the channel and the
fence in their demolition submittal. Carefully
review and enforce the approved measures.
Plan for possible "wet -pile" installation, and use
best practices to ensure pile integrity and avoid
delays. Early approval will prevent delay if wet
conditions are not anticipated.
S2 will perform source inspection on an
optional basis for the PC/PS girders. CM will
check the contractor QC plan including current
precast plant inspections and certification, and
verify girders are delivered with Certificates
of Compliance.
Closely monitor installation, verify connections
match design tolerances, and coordinate
with the contractor to ensure the fascia
is constructed and installed correctly the
first time.
► TYLin I Golden Avenue Bridge Rehabilitation 17
G. Sco
oe of Work
TYLin and Biggs Cardosa establishes the strength of our services on extensive experience with bridge projects
and federally funded programs. Our commitment is to
respond promptly and effectively to the City's construction management needs, ensuring that every member of our
team delivers the highest level of service and consistently meets the City's expectations.
Construction Administration
CONSTRUCTION MEETINGS, SCHEDULE, + FIELD MEETINGS
Mazen Mneimneh, our Resident Engineer and Structures
Representative, will coordinate weekly meetings with the contractor, the City, the designer (as needed), and third - party representatives to review project progress, identify and resolve issues, and address upcoming construction
activities, schedule, safety, and coordination with outside agencies. Mazen will also schedule, lead, and facilitate pre -construction meetings, regular progress meetings,
and other on-site construction -related discussions.
Key discussions, decisions, and action items will be
thoroughly documented through meeting minutes, which
will be prepared, distributed, and maintained in the
project records,
..., ;1E,)1.1..E ' jell
The TYLin CM Team bring extensive knowledge of
construction methods and strong expertise in the
use of industry -standard scheduling software such as
Primavera P6 and Microsoft Project. This ensures that
project schedules are developed accurately, maintained
properly, and used effectively to plan, monitor, and control construction activities. Avraham Frank will assist Mazen in reviewing the contractor's baseline schedule as well as all subsequent schedule updates to verify reasonableness, accuracy, and compliance with project requirements.
SUBMITTAL MANAGEMENT
The CM team will manage the review of project submittals, providing approvals or recommendations for approval in a timely and efficient manner. A comprehensive submittal log will be established at the outset of the project, continuously maintained, and updated to track the status of all items while clearly identifying the parties responsible for review and acceptance. To ensure accountability and effective
coordination, the submittal log will be a standing agenda item during weekly progress meetings, allowing for prompt discussion and resolution of outstanding issues.
REQL iFORMATIO'•;
The CM Team will process, track, and document all project RFIs and responses. An RFI log will be established at the G. SCOPE OF WORK
beginning of the project and continuously maintained and updated to capture the status of each item and clearly
identify the parties responsible for review and response.
The Resident Engineer will prepare timely responses to RFIs in full compliance with contract requirements, ensuring that the City's Project Manager is copied on all correspondence to keep the City fully informed throughout the process.
CONTRACT CHANGE ORDERS
The Resident Engineer will carefully review all necessary changes to the project and promptly advise the City
regarding their potential impacts on the project schedule and budget. Our team is committed to ensuring that all
CCOs are processed in a transparent, accurate, and timely manner with clear documentation to support City decision- making. Please see the level of effort assumed for managing CCOs. To achieve this, we will:
► Assemble complete documentation of item quantities,
cost calculations, inspection reports, test reports,
drawings, photographs, and other supporting materials
as required.
► Obtain concurrence from the designer for any CCOs that modify the design.
► Prepare detailed CCO estimates, including Force Account Analyses and evaluations of potential time impacts to the contractor's schedule and operations.
► Evaluate contractor price proposals for reasonableness, accuracy, and consistency with contract requirements.
► Negotiate CCOs with the contractor as directed by
the City.
► Prepare formal CCO packages and attachments upon
approval from the City, designer, and other stakeholders as appropriate.
► Maintain and update a comprehensive CCO log to
track proposed changes through review, transmittal,
and approval.
Through this structured approach we will provide the City with the confidence that all changes are fully vetted, fairly negotiated, and carefully documented, helping to control costs, maintain the schedule, and avoid potential claims.
The CM Team will prepare accurate calculations for all
completed work and the Resident Engineer will review and accept work items to support progress payments. Field
measurements will be performed as necessary to verify
quantities and prevent overpayment or underpayment.
All progress payment estimates will be fully traceable
to verified source documents based on field -measured
or calculated quantities. Once payment verification is
complete, the Resident Engineer will submit a monthly
► TYLin I Golden Avenue Bridge Rehabilitation 18
progress payment certification to the City for review,
approval, and processing. Progress payment reports will clearly separate eligible and ineligible costs to ensure proper reimbursement under the HBP.
TYLin will lead the construction observation effort by
performing the Resident Engineer role, while Biggs Cardosa will provide QA inspection to verify that all construction activities are performed in strict compliance with the
contract documents. This partnership ensures that the City receives both strong project oversight and independent
QA review. Our goal is to operate as a cohesive team,
supporting the Contractor in resolving issues promptly, maintaining compliance, and preventing potential problems or delays during construction.
Construction Observation/
Inspection Services
PRET . ' . _ , ..;;)N
The preconstruction survey will be guided by the CM
Team and will include a detailed photo documentation
log capturing the existing conditions of the project site and adjacent residences. The CM Team will provide QA
reviews to ensure that the documentation is accurate,
complete, and reliable. The resulting record will be
maintained as part of the project files and furnished to the City, serving as a critical reference to protect the City against potential tort claims by providing clear evidence of preconstruction conditions.
QUALITY ASSURANCE INSPECTIONS/MATERIALS TESTING
The Contractor will be responsible for implementing its own QC program. TYLin, with support from Biggs Cardosa, will provide QA oversight to ensure that the contractor's QC plan is properly executed and that results are independently verified. Biggs Cardosa inspectors will perform daily QA inspections and conduct materials sampling and testing
to confirm that all work complies with the approved plans and specifications. Our QA approach is focused on ensuring that the contractor's methods and procedures result in
full compliance with the contract requirements while
providing the City with an additional layer of oversight and accountability.
DAILY INSPECTION REPORTS
The Resident Engineer will review the Daily Inspection
Reports prepared by Biggs Cardosa inspectors as part of their QA duties to ensure they are accurate, complete, and fully compliant with project requirements. These reports will be prepared using a proven template that has been
successfully applied on previous projects and accepted
under Caltrans audits. Each report will document daily
construction activities, weather conditions, labor and
equipment, materials incorporated, safety observations, and any issues affecting progress. This comprehensive
documentation will provide a reliable project record,
support verification of quantities, and serve as the basis G. SCOPE OF WORK
for progress payment calculations. It will also give the City clear, consistent, and audit -ready reporting that strengthens accountability and protects against potential disputes.
PHOTOGRAPHS & VIDEOTAPE
Photos and videos will be taken on a daily basis, clearly labeled, and properly filed. Documentation will occur
before the start of construction to record existing site conditions, during construction to capture daily progress, and after construction to verify project completion. These records will also serve as an additional resource to verify the contractor's work, labor, and related activities, providing the City with a clear and reliable visual record throughout the project.
Document Control/Labor Compliance
DOCUMENT TRACKING SYSTEM
Our Office Engineer, Abigail Manriquez, will implement
and maintain a Caltrans -based document control system, customized and modified for the City, to manage all project records. This system will be modeled on the Caltrans 63 - file structure, which is the industry standard for federally funded projects, and will be tailored to the City's specific needs. Our team will work closely with the City's Project Manager to establish the document control framework
at the start of the project and ensure it is maintained throughout construction.
As part of our customized CM approach, the CM Team will organize and manage project document control, storage,
and retrieval methods in full compliance with Federal, State, and City procedures. Project records will include, but will not be limited to, Weekly Statement of Working Days, Daily Inspection Reports, Correspondence, Submittals, CCOs,
Notices of Potential Claim (NOPC), Progress Payments,
Lab and Field Test Reports, Materials Delivery Tickets and Compliance Certifications, Progress Reports, Progress
Photos, Meeting Minutes, and Monthly Reports. This effort will be led by the Resident Engineer with support from the CM team to ensure all documentation is complete, accurate, and audit ready.
The CM Team will ensure full compliance with the Davis - Bacon Act by conducting employee interviews with
the Contractor's laborers to verify labor compliance
requirements. Our team will review the Contractor's
certified payrolls, daily inspection diaries, and prevailing wage records to confirm that Equal Employment
Opportunity (EEO) requirements are implemented and
properly documented in the project files. Additionally, based on Addendum #2 issued on October 7, 2025, we
are not required to monitor or verify the contractor's
compliance with DBE participation goals or the minimum
trainee requirements outlined in LAPM Chapter 12.8.
However, we remain prepared to support this effort should the DBE requirements change. These efforts will ensure
that both federal and state labor compliance objectives are ► TYLin I Golden Avenue Bridge Rehabilitation 19
fully met while protecting the City's eligibility for federal funding and supporting workforce development and equal
opportunity throughout the project.
WEEKLY STATEMENT OF WORKING DAYS
As the daily field inspector, Biggs Cardosa will monitor the Contractor's work on a daily basis and prepare detailed daily reports documenting all work items, quantities,
directives, work locations, dates and times, weather
conditions, and other pertinent information. TYLin, serving as Resident Engineer, will review these reports for accuracy and completeness and use them to prepare the Weekly
Statement of Working Days. This statement will track total contract time from the first to the last chargeable day, including weather days, holidays, approved CCO days, and controlling activities for each week. The Weekly Statement of Working Days will be compared against the Contractor's CPM Schedule to evaluate progress and performance.
Once finalized, the statement will be signed by the
Resident Engineer and transmitted to the Prime Contractor each week.
Environmental Compliance
The CM Team will ensure that construction activities are carried out in full compliance with project permits and specifications. We will oversee the contractor -supplied biologist throughout construction and review their
qualifications prior to the start of work to confirm that they meet the criteria outlined in the Project Manual. We will also review the pre -construction survey report prepared by the contractor -supplied biologist to verify that all required tasks have been completed, results are comprehensive, and any additional required or recommended actions are addressed.
Similarly, we will review the post -construction survey report to confirm that requirements have been satisfied, results are complete, and any follow-up actions are included. If required, we will also prepare the Post -Construction Close- out Report for submission to CDFW.
TRIBAL CULTURAL RESOURCES (NATIVE AMERICAN
COORDINATION `. -NTS)
As part of the TYLin Team, Robin Turner with APRM will be responsible for the coordination with construction crews to document the date, location, and results of monitoring activities ensuring regulatory compliance during excavation and grading activities. APRM will work in the facilitation and coordination with the Tribes to ensure compliance with their TR -1 mitigation measures, uphold all required Caltrans and City cultural resources mitigation, and comply with the paleontological mitigation measures whether implied in the RFP or to cover the gaps that were inadvertently excluded in the RFP. APRM is very familiar working with the tribes and understanding their concerns.
G. SCOPE OF WORK
Post Construction Activities
;RE-FINAL/FINAL INSPECTION
The CM Team will provide continuous inspection of the work throughout construction and will prepare a punch list at the end of the project identifying all deficiencies that require correction. Our staff will monitor the work until every item on the punch list has been addressed. Once all items have been completed, a final inspection will be performed to confirm compliance before the project is accepted.
PROJECT CLOSE OUT & TRANSFER OF PROJECT RECORDS
The CM Team will follow the City's guidelines for project close-out documentation and project acceptance. At the
conclusion of the project, all files and As-Builts will be organized, packaged, and delivered to the city. Close-out documentation will include submittals, RFIs, CCOs, and
associated logs with conformance review letters; daily
inspection reports; photo and video documentation;
quarterly progress reports; approved as -built record
drawings; special inspection reports and logs detailing dates, descriptions, locations, quantities, and test results for all inspections and material tests; shop drawings with field notes filed by specification; the completed punch list; and a final project acceptance report with written assurance that the work has been completed in full compliance and is ready for acceptance by the City.
ION SCHEDULE
In response to Section H of the RFP, our proposed schedule is presented on the following page. This simplified schedule outlines the anticipated construction activities along with the corresponding CM tasks for each activity. It is based on a more detailed CPM schedule already developed by TYLin.
Key assumptions include a mobilization date of January
2026 and a construction duration of 120 working days
(approximately six months). We have also incorporated
key pre -construction activities that must occur prior to mobilization to ensure the project remains on track and free of delays.
TYLin will review the contractor's initial CPM schedule and work collaboratively to identify opportunities for schedule optimization. Potential delays will be flagged early through monthly schedule updates. Our team will conduct detailed reviews focused on maintaining schedule commitments,
monitoring critical and near -critical path activities, and identifying opportunities to recover or accelerate the
schedule. This proactive approach helps streamline CM
efforts while maximizing overall project efficiency.
► TYLin I Golden Avenue Bridge Rehabilitation 20
H. Schec
ule
Legend
' City City of Placenta PM
RE15R - ititsulent I:n.inie4i/Stnttture
Representative
INS Inspector
Censtrupebn CM Activities
5easonalConstramis
Activities
H. SCHEDULE
OE
MT Materials Testing
NT Native Tribal
120 Working Days
Psrfomed By 2025 2026
Wet Season - No work in channel Dry Season (April 15-0ctober15) Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
WI W2 W3 W4 W1 W2 W3 W4 W1 02 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 WI W2 W3 W4 Pre Construction Construc0on Post -Construction
AAAI____.... i_ `...
Award Contract City
NTP City
Pre-Cenetruction Activities
Nuliliraticns p+ioi to censlru:lien aspet Conduct meeting with major stakeholder(s) RE/OE/City coribakt documents.
Obtain, renew, and validate all required permits Include the Orange County encroachment permit, USACE Vcrdicntiun eoordinalien RE/0E Section 408 permit. Section 404 Permit, OCFCD etc.
Veeifi.ati.:ncf nxlntine ropngraph4t venwy, int fir matinn Inspection INS and prepare construction staking and layout.
Conducting and preparing lag, photograph
Pre.construction walk through. and videotape of existingslto conditions prior INS to construction
Submittal Review Establishing Ming system OE
Baseline Schedule (10 days alter award) Review baseline schedule RE/SR/OE Work Plan I/O days after award) Review work plan RE/SR/OE Demo Plan Review demo plan 14E/514/0E
Other Submittals (SW PPP, CIDH Installation Plan) Structural submittal and shop drawing reviews RE/SR/OE Concrete Mix Designs, Rebar Shop drawings, etc.)
Bat and bird survey Vivificationcoordination RE
Material procurement (PC/PS girder, hearing pad. etc.) Review procurement schedule RE Gas line relocation. Utility coordination RE
Existollllne to be cut by others. Utility coordination RE SCEpower poles to be removed. Utility coordination RE
Construction Actities
Mobilization and start or construction (120 days).
Install temporary BMPs. : SWPPP Impectfon RE/INSlOE
Locate existing utilities using USA. Utility coordination/inspection 5E/I45/05 .n8a:atton s+ dlmphmmne.Mnenf Tratim Cantrat
Bridge Work
Clear and grub.
Remove road section. sidewalk, signs, etc.
Bridge demo (Install prolective cover).
Install 5" diameter high-density polyethylene pipe and
16" reinforced concrete plpe storm drain
Excavate for Abutments 1 a 2
Contract admin/inspection RE/INS/OE
Contract admin/inspection RE/INS/OE
Monitor bridge demo on site to ensure safety and
RE/SR/INS/OE
compliance with USACE
Contractadmin/Inspection
RE/SR/INS/OE
Contract admin/inspection RE/SR/INS/OE
It
Material Procurement
Subrnetals
I_J O.nys
BrWga Wert
21 Construction
CM Activities
Seasonal Constraints
CIDH insta0tien Abutments 1 + 2
Construct pier capping • cure (Abutments I • 2)
Prepare forms. pour concrete, + cure (Abutments I + 2
Stem)
Prepare forms, pour concrete, + cure (Abutments I • 2
Backwall)
Test concrete compressive strength (fo')
Erect PC/P5 girders
Construct temporary diaphragms
Constructdeck forms
Survey and grade deck
Place reinforcement and pour deck
Cure deck
Place reinforcement steel, pour barrier and sidewalk-
Install
idew IkInstall utiReWa - fi.twes (falatom SCE - SaCal Gas) Instal] architecture treatment
Grade end backlill Abutment and approach slab.
Place reinforcement steel and pour approuh slab.
Cure approach slab.
AcymotancecM 1-psolitograph deck
Install new slope paving
Street Werk
Miscellaneous street Improvements
Signing and Striping
Demobdiaatten
Conduct Job walk
Finalizing protect and closeout
Activities
Review CFDH pile installation plan and inspect
CION installation
Contract admin/inspection
Contractatlmin/inspect rebars, forms and
concrete pour
Contractatlmin/Inspect rebars, forms and
concrete pour
Monitor pour and test far Abut seat concrete
strength before girder placement.
Contract admin/inspect elders are placed
' centered to the bearing pads
'Contract admIn/inspection
I Prepare structural engineering and measurement
calculations and perform inspection
Develop bridge grades
Contract admin/inspection
CoerdInate atyl mnnitertlekt endl b t iy
' 1 2 reR ' d by thy project p tf t n.
Contract admin/inspect rebus. forms and
e. pOUI
Contractatlmin/utility coordination/Inspectbn
Performed By
SR/INS
RE/5R/INS/OE
RE/SR/INS/MT
RE/SR/INS/Mr
RE/5R/MT
RE/SR/INS/0E
RE/SR/INS/OE
SR/INS
RE/SR/OE
RE/SR/IN510E
RE/MT I
RE/SR/INS/MT
RE/5R/INS/OE
Contract admin/inspection RE/SR/INS/0E
Contract admin/inspection RE/SR/INS/OE
Contract admin/inspect rebars, forms and
RE/SR/INS/MT
rnncrete pour
I Coordinate and monitor field and laboratory RE/MT
teen, required by the project specifications
p f m Ptonlograph for Bridge DeckCA Test547 RE/MT
Contract d 1/ p [Ion _ RE/SR/INS/OE
Contract admin/inspeotion t
Contract admin/inspection RE/IN5/00
Contractatlmin/inspection 46/I1,15/00
Contract admin/inspection
Contractedmin/inspection RE/INS/City
ReVlaw final ueintAte, attange fora -bunts.
120 Working Days
2025 2026
Wet Season -Newark In channel Dry Season (April l5 -October 15) Mar Apr May Jun Jul
W1 W2 W3 W4 W1 W2 0/3 W4 W1 W2 W3 144 W1 W2 W3 W4 0/1 W2 W3 604 W1 W2 W3 W4 Construction Port -Construction
Sep Oct Nov Dec Jan Feb
completo5501Aforms and Bolivar an files to the RE/DE
City accordingly
H. SCHEDULE
I
I
I _I
22 Proposed Exceptions
cfl
PROPOSED EXCEPTIONS
agrees to submit to the personal jurisdiction of such court in the event of such action.
6.7. Assignment. Consultant shall not voluntarily or by operation of law assign, transfer, sublet or encumber all or any part of Consultant's interest in this Agreement without City's prior written consent.
Any attempted assignment, transfer, subletting or encumbrance shall be void and shall constitute a breach of this Agreement and cause for termination of this Agreement. Regardless of City's consent, no subletting or assignment shall release Consultant of Consultant's obligation to perform all other obligations to be performed by Consultant hereunder for the term of this Agreement.
6.8. Indemnification and Hold Harmless. Consultant agrees to defend, indemnify, hold free and harmless the City, its elected and appointed officials, officers, agents and employees, at Consultant's sole expense, from and against any and all claims, demands, actions, suits or other legal proceedings arising out of, pertaining to, or relating to the negligence, recklessness, or willful misconduct of Consultant brought against the City, its elected and appointed officials, officers, agents and employees arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence, recklessness, or willful misconduct by the Consultant, its employees, and/or authorized subcontractors, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, recklessness, or willful misconduct of the Consultant, its employees, and/or authorized subcontractors, and/or -whenever any claim, action, complaint or suit asserts liability against the City, its elected and appointed officials, officers, agents and employees based upon the negligence, recklessness, or willful misconduct of the Consultant, its employees, and/or authorized subcontractors under this Agreement, whether or not the Consultant, its employees, and/or authorized subcontractors are specifically named or otherwise asserted to be liable. Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole active negligence or willful misconduct of the City. This provision shall supersede and replace all other indemnity provisions contained either in the City's specifications or Consultant's Proposal, which shall be of no force and effect.; fl
6.9. Independent Contractor. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant's employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its or employees are in any manner agents or employees of City. Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker's compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant's failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.
6.10. PERS Eligibility Indemnification. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City. ► TYLin I Golden Avenue Bridge Rehabilitation VI
PROPOSED EXCEPTIONS
Summary of Comments on RFP PW -25-05 (HC
2025.9.23).pdf
Page: 26
I. (Number: 1 Author: Henry ChenSubject: Inserted Text Date: 9/23/2025 12:13:57 PM Notwithstanding the foregoing, to the extent that this Agreement includes design professional services under California Civil Code Section 2782.8, as may be amended from time to time, such duties of Consultant to indemnify shall only be to the full extent permitted by California Civil Code Section 2782.8.
► TYLin I Golden Avenue Bridge Rehabilitation VII
Required Forms
REQUIRED FORMS
SUMMARY SHEET
Firm Name: T.Y. Lin International (TYLin)
Firm Parent or Ownership: T.Y. Lin International Group Ltd., a Delaware corporation Firm Address: 707 Wilshire Blvd, Suite 4900, Los Angeles, CA 90017 Firm Telephone Number: (213) 943-7960
Firm Fax Number: N/A
Number of years in existence: 71
Management Contact (person responsible for direct contact with the City of Placentia and services required for this Request for Proposal):
Name: Joseph Smith Title: Vice President
Telephone Number: (619) 908-3306 Fax: NIA
Email: [email protected]
Project Manager (Person responsible for day-to-day servicing of the account):
Name: Mazen Mneimneh Title: Senior Program Manager
Telephone Number: (949) 268-5424 Fax: N/A
Email: [email protected]
Types of services provided by the firm: Construction Management, Civil Engineering
3.- TYLin I Golden Avenue Bridge Rehabilitation IX
REQUIRED FORMS
APPENDIX C
CERTIFICATION OF PROPOSAL TO THE CITY OF PLACENTIA
1. The undersigned hereby submits its proposal and, by doing so, agrees to furnish services to the City in accordance with the Request for Proposal (RFP), dated SEPTEMBER 18, 2025, and to be bound by the terms and conditions of the RFP.
2. This firm has carefully reviewed its proposal and understands and agrees that the City is not responsible for any errors or omissions on the part of the proposer and that the proposer is responsible for them.
3. It is understood and agreed that the City reserves the right to accept or reject any or all proposals and to waive any informality or irregularity in any proposal received by the City.
4. The proposal includes all of the commentary, figures and data required by the Request for Proposal, dated SEPTEMBER 18, 2025.
5. This firm has carefully read and fully understands all of the items contained in the RFP. This firm agrees to all of the requirements except for those disclosed by the firm in project proposal, listed on an attachment.
6. The proposal shall be valid for 90 days from SEPTEMBER 18, 2025.
Name of Firm: T.Y. Lin International
(Authorized Signature)
By:
Type Name: Joseph Smith
Title: Vice President
Date: 10/16/25
► TYLin I Golden Avenue Bridge Rehabilitation X
Local Assistance Procedures Manual Not Applicable to TYLin EXHBIT10-Q
REQUIRED FORMS
Disclosure of Lobbying Activities
EXHIBIT 10-Q DISCLOSURE OF LOBBYING ACTIVITIES
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352
1. Type of Federal Action:
a. contract
b. grant
c. cooperative agreement
d. loan
e. loan guarantee
f loan insurance
2. Status of Federal Action: 3. Report Type:
a.
b.
c.
bid/offer/application ❑ a. initial
initial award
post -award
4. Name and Address of Reporting Entity
❑ Prime I I Subawardee
Tier , if known
Congressional District, if known
6. Federal Department/Agency:
8. Federal Action Number, if known:
10. Name and Address of Lobby Entity
(If individual, last name, first name, MI)
❑ b. material change
For Material Change Only:
year quarter
date of last report
5. If Reporting Entity in No. 4 is Subawardee,
Enter Name and Address of Prime:
Congressional District, if known
7. Federal Program Name/Description:
CFDA Number, if applicable
9. Award Amount, if known:
11. Individuals Performing Services
(including address if different from No. 10)
(last name, first name, MI)
(attach Continuation Sheet(s) if necessary)
12. Amount of Payment (check all that apply)
$ actual n planned
13. Form of Payment (check all that apply):
8 a. cash
b. in-kind; specify: nature
Value
14. Type of Payment (check all that apply)
MN
a, retainer
b. one-time fee
c. commission
d. contingent fee
e deferred
f. other, specify
15. Brief Description of Services Performed or to be performed and Date(s) of Service, including officer(s), employee(s), or member(s) contacted, for Payment Indicated in Item 12:
(attach Continuation Sheet(s) if necessary)
16. Continuation Sheet(s) attached: Yes El
17, Information requested through this form is authorized by Title 31 U.S.C. Section 1352. This disclosure of lobbying reliance was placed by the tier above when his transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to Congress
semiannually and will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Federal Use Only:
Distribution: Orig- Local Agency Project Files
LPP 13-01
No n„
I/
Signature: . 4
Print Name: Joseph Smith
Title: Vice President
Telephone No.: (619) 908.3306
Standard Form LLL Rev. 04-28-06
Date: 10/16/25
Authorized for Local Reproduction
Standard Form - LLL
May 8, 2013
► TYLin Golden Avenue Bridge Rehabilitation XI
Local Assistance Procedures Manual
REQUIRED FORMS
EXHIBIT 10-U
Consultant Management Conflict of Interest Statement
EXHIBIT 10-U CONSULTANT IN MANAGEMENT SUPPORT ROLE CONFLICT OF INTEREST AND CONFIDENTIALITY STATEMENT1
RFP/RFQ PROCUREMENT NUMBERS (if applicable): RFP #PW -25-05 Professional Construction Management and Inspection Services for the PROJECT NAME (and FPN, if applicable)2: Golden Avenue Bridge Rehabilitation Project & Orange County Bikeway Loop Segment D from Station 21+00 North of Golden Avenue to Station 31+00 South of Golden Avenue (FPN BRLS 5269[025])
APPLICABILITY: To be filled out by local agency consultants in management support role. m I am an employee of a consultant under contract to the local agency that is responsible for the procuring and administering of one or more consultant contracts containing either Federal or State funds.
❑ I am in a management position with the local agency, my title is listed below and I have attached my duty statement and scope of work.
m I hereby certify as follows:
1. I recuse myself from all potential conflicts of interest.
2. I will not directly or indirectly participate in, manage, or oversee any consultant selection procurement process in which the consulting firm of which I am employed is competing as a consultant or subconsultant.
3. I will not directly or indirectly influence any employee, staff member, or other individual participating in any consultant selection procurement process in which the consulting firm of which I am employed is as a consultant or subconsultant.
4. I will not directly or indirectly participate in, manage, or oversee any local agency contract that is with the consulting firm of which I am employed, regardless of whether the involvement of my employer in the contract is as a consultant or subconsultant.
Among other things, this includes my not being involved in approving changes in the schedule, scope, deliverables or invoices.
5. I understand that if I am involved in any local agency contract that is with the consulting firm of which I am employed, in violation of 1. or 2. above, that local agency contract will no longer be eligible for Federal or State reimbursement because of my involvement.
m I certify that I have read and understand my responsibilities per 23 CFR 172.7(b)(5) m I fully understand that it is unlawful for a person to utilize any organization name (i.e. local agency) or auxiliary organization information, which is not a matter of public record, for personal gain.
Each consultant staff working in a management support role shall complete a separate form. 2 For on-call contracts or contracts for multiple projects, indicate accordingly.
January 2018
► TYLin I Golden Avenue Bridge Rehabilitation XII
REQUIRED FORMS
Local Assistance Procedures Manual EXHIBIT 10-U
Consultant Management Conflict of Interest Statement
❑✓ I have read and fully understand all of the above.
10/16/2025\K
Date:
Signature:
Name: Joseph Smith
Vice President
Title:
Consultant Firm/Sole Proprietor: T.Y. Lin International k)
REVIEWED BY PUBLIC WORKS DIRECTOR OR AUTHORIZED LOCAL AGENCY
REPRESENTATIVE
I have reviewed the foregoing "Conflict of Interest and Confidentiality Statement" and will ensure:
❑ That the foregoing named local agency consultant who is under contract and in a management support role with our local agency, abides by the foregoing terms and conditions; ❑ That should the foregoing named local agency consultant, who is under contract and in a management support role with our local agency, violate any of the foregoing terns and conditions, the Caltrans DLAE will be notified and such violation will be considered a breach of ethics and could be a basis for ineligibility of State or Federal project funds. ❑ The procedures followed to procure and execute the contract, between the local agency and the consulting firm of which I am employed, comply with all federal and state requirements. Also this contract has a specific date from to
Date:
Signature:
Name:
Title:
Department/Local Agency:
January 2018
► TYLin I Golden Avenue Bridge Rehabilitation XIII
REQUIRED FORMS
Local Assistance Procedures Manual EXHIBIT IO -U
Consultant Management Conflict of Interest Statement
REVIEWED/CONCURRENCE BY FEDERAL HIGHWAYS
I have reviewed the foregoing "Conflict of Interest and Confidentiality Statement" and supervisor's statement.
❑ I concur that the consultant, who is under contract and in a management support role with the local agency, does not appear to present a conflict of interest. The local agency and the consultant should be considered eligible for federal reimbursement.
D I do not concur as I believe that the consultant, who is under contract and in a management support role with the local agency, does appear to present a conflict of interest.
Date:
Signature:
Name:
Position:
Distribution: 1) Copy to: DLAE for each Federal/State funded project 2) Copy to be returned to Local Agency by DLAE with FHWA approval
January 2018
► TYLin I Golden Avenue Bridge Rehabilitation XIV
REQUIRED FORMS
Local Assistance Procedures Manual Exhibit 10-1
Notice to Proposers DBE Information
Exhibit 10-1: Notice to Proposers DBE Information
(federally funded projects only)
The Local Public Agency (LPA) has established a DBE goal for this Contract of
1. TERMS AS USED IN THIS DOCUMENT
0.00 The term "Disadvantaged Business Enterprise" or "DBE" means a for-profit small business concern owned and controlled by a socially and economically disadvantaged person(s) as defined in Title 49, Code of Federal Regulations (CFR), Part 26.5.
The term "Agreement" also means "Contract."
• LPA also means the local entity entering into this contract with the Contractor or Consultant. • The term "Small Business" or "SB" is as defined in 49 CFR 26.65.
2. AUTHORITY AND RESPONSIBILITY
A. DBEs and other small businesses are strongly encouraged to participate in the performance of Contracts financed in whole or in part with federal funds (see 49 CFR 26: Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs).
The Consultant must ensure that DBEs and other small businesses have the opportunity to participate in the performance of the work that is the subject of this solicitation and should take all necessary and reasonable steps for this assurance. The proposer must not discriminate on the basis of race, color, national origin, or sex in the award and performance of subcontracts.
B. Proposers are encouraged to use services offered by financial institutions owned and controlled by DBEs.
3. SUBMISSION OF DBE INFORMATION
If there is a DBE goal on the contract, Exhibit 10-01: Consultant Proposal DBE Commitment must be included in the Proposal. In order for a proposer to be considered responsible and responsive, the proposer must make good faith efforts to meet the goal established for the contract. If the goal is not met, the proposer must document adequate good faith efforts. All DBE participation will be counted towards meeting the contract goal; therefore, all DBE participation must be collected and reported.
Exhibit 10-02: Consultant Contract DBE Information must be included in best qualified consultant's executed consultant contract. Even if no DBE participation will be reported, the successful proposer must execute and return the form.
4. DBE PARTICIPATION GENERAL INFORMATION
It is the proposer's responsibility to be fully informed regarding the requirements of 49 CFR 26, and the Department's DBE program developed pursuant to the regulations. Particular attention is directed to the following:
A. A DBE must be a small business firm defined pursuant to 13 CFR 121 and be certified through the California Unified Certification Program (CUCP).
B. A certified DBE may participate as a prime consultant, subconsultant, joint venture partner, as a vendor of material or supplies, or as a trucking company.
C. A DBE proposer not proposing as a joint venture with a non -DBE, will be required to document one or a combination of the following:
1. The proposer is a DBE and will meet the goal by performing work with its own forces.
January 2025
► TYLin I Golden Avenue Bridge Rehabilitation XV
REQUIRED FORMS
Local Assistance Procedures Manual Exhibit 10-1
Notice to Proposers DBE Information
2. The proposer will meet the goal through work performed by DBE subconsultants, suppliers or trucking companies.
3. The proposer, prior to proposing, made adequate good faith efforts to meet the goal.
D. A DBE joint venture partner must be responsible for specific contract items of work or clearly defined portions thereof. Responsibility means actually performing, managing, and supervising the work with its own forces. The DBE joint venture partner must share in the capital contribution, control, management, risks and profits of the joint venture commensurate with its ownership interest.
E. A DBE must perform a commercially useful function pursuant to 49 CFR 26.55, that is, a DBE firm must be responsible for the execution of a distinct element of the work and must carry out its responsibility by actually performing, managing and supervising the work.
F. The proposer must list only one subconsultant for each portion of work as defined in their proposal and all DBE subconsultants should be listed in the bid/cost proposal list of subconsultants.
G. A prime consultant who is a certified DBE is eligible to claim all of the work in the Contract toward the DBE participation except that portion of the work to be performed by non -DBE subconsultants.
5. COUNTING DBE PARTICIPATION
Materials or supplies purchased from DBEs count towards the DBE goal under the following conditions:
A. If the materials or supplies are obtained from a DBE manufacturer, count 100 percent of the cost of the materials or supplies. A DBE manufacturer is a firm that operates or maintains a factory, or establishment that produces on the premises the materials, supplies, articles, or equipment required under the Contract and of the general character described by the specifications.
B. If the materials or supplies purchased from a DBE regular dealer, count 60 percent of the cost of the materials or supplies. A DBE regular dealer is a firm that owns, operates or maintains a store, warehouse, or other establishment in which the materials, supplies, articles or equipment of the general character described by the specifications and required under the Contract are bought, kept in stock, and regularly sold or leased to the public in the usual course of business. To be a DBE regular dealer, the firm must be an established, regular business that engages, as its principal business and under its own name, in the purchase and sale or lease of the products in question. A person may be a DBE regular dealer in such bulk items as petroleum products, steel, cement, gravel, stone or asphalt without owning, operating or maintaining a place of business provided in this section.
C. If the person both owns and operates distribution equipment for the products, any supplementing of regular dealers' own distribution equipment must be, by a long-term lease agreement and not an ad hoc or Agreement -by -Agreement basis. Packagers, brokers, manufacturers' representatives, or other persons who arrange or expedite transactions are not DBE regular dealers within the meaning of this section.
D. Materials or supplies purchased from a DBE, which is neither a manufacturer nor a regular dealer, will be limited to the entire amount of fees or commissions charged for assistance in the procurement of the materials and supplies, or fees or transportation charges for the delivery of materials or supplies required on the job site, provided the fees are reasonable and not excessive as compared with fees charged for similar services
6. RESOURCES
A. The CUCP database includes the certified DBEs from all certifying agencies participating in the CUCP. If you believe a firm is certified that cannot be located on the database, please email DBE.Certification at dot.ca.aov for assistance.
B. Access the CUCP database from the Department of Transportation, Office of Civil Rights website. For guidance on how to search for certified firms using the CUCP database, please visit: DBE Goal Setting I Caltrans
January 2025
► TYLin I Golden Avenue Bridge Rehabilitation XVI
Local Assistance Procedures Manual
REQUIRED FORMS
Exhibit 10-01
Consultant Proposal DBE Commitment
EXHIBIT 10-01 CONSULTANT PROPOSAL DBE COMMITMENT
Reset Form
1. Local Agency: City of Placentia 2. Contract DBE Goal: 0%
3. Project Description: Construction Management and Inspection Services for the Golden Avenue Bridge Rehabilitation Project
4. Project Location: Placentia, California
5. Consultants Name: T.Y. Lin International
7. Description of Work, Service, or Materials
Supplied
Materials testing
Cultural resources
6. Prime Certified DBE: El
8. DBE
Certification 9. DBE Contact Information 10. DBE %
Number
Sz Engineering, Inc. 18608 Utica Ave, Suite 100, Rancho 30866 Cucamonga, CA 9173o 1 SagarPandey 1909.884.8276 I TBD [email protected]
ArchaeoPaleo Resource Management, Inc. 11531 Pontius
35813 Ave., Suite 200 Los Angeles, CA 90025 1 Robin Turner 1 TBD [email protected]
Local Agency to Complete this Section
17. Local Agency Contract Number:
18. Federal -Aid Project Number:
Consultants Ranking after Evaluation:
Local Agency certifies that all DBE certifications are valid and information on this form is complete and accurate.
21. Local Agency Representative's Signature 22. Date
23. Local Agency Representative's Name 24. Phone
25. Local Agency Representative's Title
DISTRIBUTION: Original — Included with consultant's proposal to local agency.
11. TOTAL CLAIMED DBE PARTICIPATION TBD **
IMPORTANT: Identify all DBE firms being claimed for credit, regardless of tier. Written confirmation of each listed DBE is required..,
1\i"7,7! 10/16/2025
12. Preparer's Signature 13. Date
Joseph Smith (619) 908-3306
14. Preparer's Name 15. Phone
Vice President
16. Preparer's Title
** Based on the latest DBE ruling issued as part
of Addendum #2 released on October 7th, 2025.
ADA Notice: For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD (916) 654- 3880 or write Records and Forms Management, 1120 N Street, MS -89, Sacramento, CA 95814.
LPP 18-01 Page 1 of 2
January 2019
► TYLin 1 Golden Avenue Bridge Rehabilitation XVII
Business & Contact Information
BUSINESS NAME
OWNER
ADDRESS
REQUIRED FORMS
ArchaeoPaleo Resource Management, Inc., DBA None
Ms. Robin D Turner
12304 Santa Monica Blvd., Suite 202
Los Angeles, CA 90025
PHONE 424-248-3316
FAX 424-248-3417
EMAIL [email protected]
WEBSITE http://www.archaeopaleo.com
ETHNICITY Caucasian
GENDER Female
COUNTY Los Angeles (CA)
Certification Information
CERTIFYING AGENCY Los Angeles County Metropolitan Transportation Authority CERTIFICATION TYPE DBE - Disadvantaged Business Enterprise CERTIFIED BUSINESS DESCRIPTION Archeological and cultural services Commodity Codes
Code Description
NAICS 541620 Environmental consulting services
NAICS 541690 Other Scientific and Technical Consulting Services NAICS 541990 All Other Professional, Scientific, and Technical Services NAICS 712120 Historical sites
Additional Information
WORK DISTRICTS/REGIONS All work districts/regions
CUCP PUBLIC DIRECTORY 35813
CERTIFICATION NUMBER
TYLin I Golden Avenue Bridge Rehabilitation XVIII
REQUIRED FORMS
Business & Contact Information
BUSINESS NAME S2 ENGINEERING
OWNER Mr. Pavitra Pandey
ADDRESS 8608 UTICA AVE STE 100
SUITE 100
RANCHO CUCAMONGA, CA 91730 [map]
PHONE 909-373-8240
FAX 909-373-8241
EMAIL [email protected]
WEBSITE http://www.s2-ei.com
ETHNICITY Subcontinent Asian American
GENDER Male
COUNTY San Bernardino (CA)
Certification Information
CERTIFYING AGENCY California Department of Transportation CERTIFICATION TYPE DBE - Disadvantaged Business Enterprise CERTIFIED BUSINESS DESCRIPTION MANAGEMENT INFORMATION SYSTEMS; TRAFFIC ENGINEER; CONSULTANT, ENGINEERING; ARCHITECTURAL ENGINEER; CIVIL ENGINEERING; SAFETY STUDIES; CONSTRUCTION MANAGEMENT; LABORATORY TESTING AND ANALYSIS; Engineering services; Building inspection services; Testing Laboratories and Services; Other Management Consulting Services
Commodity Codes
Code Description
CA WCC C8702 MANAGEMENT INFORMATION SYSTEMS
CA WCC C8703 TRAFFIC ENGINEER
CA WCC C8715 CONSULTANT, ENGINEERING
CA WCC C8716 ARCHITECTURAL ENGINEER
https://californiaucp.dbesystem.com 1/2
TYLin I Golden Avenue Bridge Rehabilitation XIX
ti
Construction Management
Inspection Services
Materials Testing
52 Engineering
October 9, 2025
Mazen Mneimneh
Senior Program Manager
TYLin
20 Pacifica
Suite 350
Irvine, CA 92618
REQUIRED FORMS
8608 Utica Avenue, Suite 100 Rancho Cucamonga, CA 91730 Phone: (909) 3731240 . Fax: (909) 373-8241. Website: www. S2-ei.com Subject: City of Placentia 1 Construction Management and Inspection Services for the Golden Avenue Bridge Rehabilitation Project 1 RFP #PW -25-05/ Federal Project #BRLS 5269(025)
Dear Mr. Mneimneh,
S2 Engineering, Inc. (S2) is pleased to commit its services to T.Y. Lin International (TYLin) for the Construction Management and Inspection Services for the Golden Avenue Bridge Rehabilitation Project [RFP #PW-25- 05/Federal Project #BRLS 5269(025)]. We will be assisting TYLin in providing materials testing as a non-exclusive subconsultant.
S2 is a DBE/CBE certified firm, CUCP Certificate Number 30866.
In addition, we have reviewed the RFP for any potential conflicts of interest and have concluded that S2 has no anticipated conflicts of interest to this contract.
1, Sagar Pandey, am authorized to bind the firm to the contract. Should you have any questions, please contact me directly at (909) 884-8276 or [email protected].
Sincerely,
Sagar Pandey, PE
Principal Engineer
► TYLin I Golden Avenue Bridge Rehabilitation XX
REQUIRED FORMS
BIGGS CARDOSA
ASSOCIATES INC
STRUCTURAL ENGINEERS
8B5 The?. Alameda
San Jose, CA 951 26-31 33
Telcphono 408.298.5515
October 9, 2025
Mazen Mneimneh
Senior Program Manager
TYLin
20 Pacifica, Suite 350
Irvine, CA 92618
Subject: City of Placentia 1 Construction Management and Inspection Services for the Golden Avenue Bridge Rehabilitation Project 1 RFP #PW -25-05/ Federal Project #BRLS 5269(025) Dear Mr. Mneimneh,
Biggs Cardosa Associates, Inc. is pleased to commit its services to T.Y. Lin International (TYLin) for the Construction Management and Inspection Services for the Golden Avenue Bridge Rehabilitation Project [RFP #PW-25-05/Federal Project #BRLS 5269(025)]. As an exclusive key subconsultant, we will be assisting TYLin in providing Field Engineering/Inspections and/or Structure Representative services up to the allocated subcontract amount for of at least 25% of the value of the construction management services contract before the required contract distribution of the consultant contact value to DBE firms.
In addition, we have reviewed the RFP for any potential conflicts of interest and have concluded that Biggs Cardosa has no anticipated conflicts of interest to this contract.
I, Ron Oen, am authorized to bind the firm to the contract. Should you have any questions, please contact me directly at 408.550.8566 or [email protected].
Sincerely,
BIGGS CARDOSA ASSOCIATES, Inc.
Ronald L. Oen, PE, QSD
Principal 1 Vice President
► TYLin I Golden Avenue Bridge Rehabilitation XXI
REQUIRED FORMS
ArchaeoPaleo Resource Management, inc.
A full-service Archaeology and Paleontology company
SBE/WBE/WOSB/DBE/VSBE/UDBE/LBE/SLBI:,'CBE/MicroBE Certified October 9, 1025
Mazen Mncimnch
Senior Program Manager
TYLin
20 Pacifica
Suite 350
Irvine, CA 92618
Subject: City or Placentia l Construction Management and Inspection Services for the Golden Avenue Bridge Rehabilitation Project RFP #PW -25-05/ Federal Project #BRLS 5269(025)
Dear Mr. Mncimneh,
ArchacoPaleo Resource Management, lnc.is pleased to commit its services to T.Y. Lin International (TYLin) for the Construction Management and inspection Services for the Golden Avenue Bridge Rehabilitation Project [RFP #PW-25-05/Federal Project #BRLS 5269(025)]. We will he assisting TYLin in providing CM Cultural Resources oversight For Tribal Coordination of the assigned Native Ame4rican monitor to ensure compliance with CEQA requirements as a subconsultant.
ArchaeoPalco Resource Management, inc.is a DBE/CBE certified firm, Certificate Number 4867 by Los Angeles Metro and also Caltrans, CUCP, and both L. A. County and City. in addition, we have reviewed the RFP for any potential conflicts of interest and have concluded that ArchaeoPaleo Resource Management, Inc. has no anticipated conflicts of interest to this contract.
I. Robin Turner, am authorized to bind the firm to the contract. Should you have any questions, please contact me directly at (424) 248-3316 or IItinmrri ;ircliac.01.1,00 .
Sincerely,
Robin Turner
President
12304 Santa Monica Blvd., Suite 202 424/248.3316 ph
Los Angeles, CA 90025 424/248-3417 fax
XXII
TYLin I Golden Avenue Bridge Rehabilitation
CITY OF PLACENTIA
CONSTRUCTION MANAGEMENT AND INSPECTION
SERVICES FOR THE GOLDEN AVENUE BRIDGE
REHABILITATION PROJECT
FEDERAL PROJECT NO. BRLS 5269(025)
REQUIRED FORMS
ORANGE COUNTY BIKEWAY LOOP SEGMENT D FROM
STATION 21+00 NORTH OF GOLDEN AVENUE TO
STATION 31+00 SOUTH OF GOLDEN AVENUE
DATE: October 1, 2025
SUBJECT: Addendum # 1
ADDENDUM ACKNOWLEDGMENT:
Firm Name: TYLin
Authorized Signature:
Date: 10/2/25
1 wy6
Acknowledgment of Receipt of Addendum # 1 is required by signing.
► TYLin I Golden Avenue Bridge Rehabilitation XXIII
CITY OF PLACENTIA
REQUIRED FORMS
CONSTRUCTION MANAGEMENT AND INSPECTION
SERVICES FOR THE GOLDEN AVENUE BRIDGE
REHABILITATION PROJECT
FEDERAL PROJECT NO. BRLS 5269(025)
ORANGE COUNTY BIKEWAY LOOP SEGMENT D FROM
STATION 21+00 NORTH OF GOLDEN AVENUE TO
STATION 31+00 SOUTH OF GOLDEN AVENUE
DATE: October 7, 2025
SUBJECT: Addendum # 2
ADDENDUM ACKNOWLEDGMENT:
Firm Name: TYLin
Authorized Signature:
Date: 10/8/25
Acknowledgment of Receipt of Addendum # 2 is required by signing.
► TYLin I Golden Avenue Bridge Rehabilitation XXIV
0 C
• will
Oil
114
liI
L
EXHIBIT B
INSURANCE REQUIREMENTS
A. Minimum Scope and Limits of Insurance
City reserves the right to review any and all of the required insurance policies and/or endorsements, but has no obligation to do so. Failure to demand evidence of full compliance with the insurance requirements set forth in this Agreement or failure to identify any insurance deficiency shall not relieve Consultant from, nor be construed or deemed a waiver of, its obligation to maintain the required insurance at all times during the performance, including any extension thereof, of this Agreement.
Consultant shall obtain, maintain, and keep in full force and effect during the life of this Agreement, including any extension thereof, all of the following minimum scope of insurance coverages:
1. Commercial General Liability Insurance
Broad -form commercial general liability, with coverage at least as broad as the most current version of ISO Commercial General Liability coverage form CG 00 01, in a form at least as broad as ISO form CG 00 01 04 13, and shall include insurance for premises and operations, products/completed operations, broad form property damage, blanket contractual liability, independent contractors, personal injury or bodily injury, and personal and advertising injury with a policy limit of not less than Two Million Dollars ($2,000,000.00) per occurrence and Four Million Dollars ($4,000,000.00) general aggregate. The aggregate limit, encompassing the above coverage, shall apply separately to this project/location. If Consultant maintains higher limits than the specified minimum limits, City requires and shall be entitled to coverage for the higher limits maintained by the Consultant.
2. Business Automobile Liability Insurance
Business automobile liability for all owned, hired, leased, and non -owned vehicles at least as broad as the most current version of ISO Business Auto Coverage form CA 00 01, with a policy limit of not Tess than Two Million Dollars ($2,000,000.00) combined single limit per accident. If Consultant maintains higher limits than the specified minimum limits, City requires and shall be entitled to coverage for the higher limits maintained by the Consultant.
3. Workers' Compensation and Employer's Liability Insurance Workers' compensation insurance as required by the State of California and Employer's Liability Insurance with a minimum limit of One Million Dollars ($1,000,000.00) per accident for any employee or employees of Consultant. Consultant agrees to waive and to obtain endorsements from its workers' compensation insurer waiving subrogation rights under its workers' compensation insurance policy against the City, its officers, officials, agents, employees, and volunteers for losses arising from work performed by Consultant for the City and to require each of its subcontractors, if any, to do likewise under their workers' compensation insurance policies.
By signing this Agreement, the Consultant acknowledges and agrees to the following:
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.
The Consultant shall also comply with Section 3800 of the Labor Code by securing, paying for, and maintaining in full force and effect for the duration of this Agreement, complete workers' compensation insurance, and shall furnish a certificate of insurance to the Project Manager before execution of this Agreement by the City. The City, its officers, officials, agents, employees, and volunteers shall not be responsible for any claims in law or equity occasioned by failure of the Consultant to comply with this Section.
4. Professional Errors and Omissions ("E&O") Liability Insurance Professional errors and omissions ("E&O") liability insurance appropriate to the Consultant's profession, with limits of not less than Two Million Dollars ($2,000,000.00) per occurrence and Three Million Dollars ($3,000,000.00) aggregate. The retroactive date must be shown and must be before the date of the contract or the beginning of contract work. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work. If coverage is canceled or non -renewed, and not replaced with another claims -made policy form with a retroactive date prior to the contract effective date, the Consultant must purchase "extended reporting coverage" for a minimum of five (5) years after completion of contract work. A copy of the claims reporting requirements must be submitted to the Project Manager for review. If Consultant maintains higher limits than the specified minimum limits, City requires and shall be entitled to coverage for the higher limits maintained by the Consultant.
5. Standards for Insurance Companies
All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commission to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders' rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide.
B. Documentation and Other Provisions
1. The commercial general liability insurance policy and business automobile liability policy shall be endorsed to contain the following: The City of Placentia, its officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied, or used by the Consultant; and automobiles owned, leased, hired, or borrowed by the Consultant. General liability coverage can be provided in the form of an endorsement to the Contractor's insurance at least as broad as one of the following ISO ongoing operations forms: CG 20 10 or CG 20 26 or CG 20 33 (not allowed from subcontractors), or CG 20 38; and one of the following ISO completed operations forms:
CG 20 37, 2039 (not allowed from subcontractors), or CG 20 40.
2. Said policies shall not terminate, nor shall they be cancelled or coverage reduced, without
at least thirty (30) days' written notice to the City. In the event of any cancellation or reduction in coverage or limits of any insurance, Consultant shall forthwith obtain and submit proof of substitute insurance. Should Consultant fail to immediately procure other insurance, as specified, to substitute for any cancelled policy or reduction in the required coverage limits, the City may procure such insurance at Consultant's sole cost and expense.
3. The Consultant's insurance coverage shall be primary insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the City of Placentia, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Placentia shall be excess and not contributing with the insurance provided by this policy.
4. Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Placentia, its officers, officials, agents, employees, and volunteers.
5. Defense fees and costs shall not deplete the limits of any insurance provided under this Agreement.
6. The Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.
7. Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Consultant shall ensure the City is an additional insured on insurance required from subcontractors.
8. Consultant agrees to waive, and to obtain endorsements from insurers waiving, subrogation rights against the City, its officers, officials, agents, employees, and volunteers for losses arising from work performed by Consultant for the City and to require each of its subcontractors, if any, to do likewise under their insurance policies.
9. Coverage shall be on a standard occurrence form. Claims -made forms are not acceptable, except under the Professional Errors & Omissions ("E&O") Liability policy.
Modified, limited, or restricted occurrence forms are not acceptable.
EXHIBIT C
CERTIFICATES OF INSURANCE AND ENDORSEMENTS
15 4jnnterna%lOn=11
Rev. 01/2024
AC RO D®
�.� 11/1/2026 12/9/2025
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
CERTIFICATE OF LIABILITY INSURANCE
DATE (MM/DD/YYYY)
PRODUCER Lockton Companies, LLC
DBA Lockton Insurance Brokers, LLC in CA
CA license #0F15767
444 W. 47th St., Ste. 900
Kansas City MO 64112-1906
(816) 960-9000 [email protected]
T.Y. LIN INTERNATIONAL
404 CAMINO DEL RIO SOUTH, SUITE 700
SAN DIEGO CA 92108
INSURED
1494343
COVERAGES
CONTACT
NAME:
I PHONE
!/1('Nl o. Extl:
AD/D`RESS:
I
FAX
(A/C, No):
INSURER(S) AFFORDING COVERAGE
INSURER A : Zurich American Insurance Company
INSURER B : Lloyds of London
1 INSURER C :
I INSURER D
NAIC #
16535
1 INSURER E :
1 INSURER F :
CERTIFICATE NUMBER: 22618749 REVISION NUMBER: XXXXXXX
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
A X
TYPE OF INSURANCE
COMMERCIAL GENERAL LIABILITY
CLAIMS -MADE [ X OCCUR
X SEVERABILITY
X CLAUSE
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY X PECO- LOC
OTHER:
A AUTOMOBILE LIABILITY
X ANY AUTO
OWNED SCHEDULED
AUTOS ONLY AUTOS
X HIRED NON -OWNED
AUTOS ONLY AUTOS ONLY
UMBRELLA LIAB
EXCESS LIAB
OCCUR
CLAIMS -MADE
DED RETENTION $
WORKERS COMPENSATION
A AND EMPLOYERS' LIABILITY
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
If yes, describe under
DESCRIPTION OF OPERATIONS below
B PROFESSIONAL
LIABILITY
Y/N
N
ADDL SUBR
INap WVD
POLICY EFF POLICY EXP
POLICY NUMBER (MM DD/YYYY) (MM/DD/YYYY1
Y Y GL03021088 11/1/2025 11/1/2026
y y BAP 3021090 11/1/2025 11/1/2026
NOT APPLICABLE
Y WC 3021089
NIA
N N B0713GLCON2500104
11/1/2025 11/1/2026
11/1/2025 11/1/2026
LIMITS
EACH OCCURRENCE
DAMAGE TO RENTED
PREMISES (Ea occurrence)
MED EXP (Any one person)
PERSONAL & ADV INJURY
GENERAL AGGREGATE
PRODUCTS - COMP/OP AGG
COMBINED SINGLE LIMIT
(Ea accident)
BODILY INJURY (Per person)
BODILY INJURY (Per accident)
PROPERTY DAMAGE
(Per accident)
EACH OCCURRENCE
AGGREGATE
2,000,000
1,000,000
25,000
2,000,000
4,000,000
4,000,000
2,000,000
XXXXXXX
XXXXXXX
XXXXXXX
XXXXXXX
XXXXXXX
XXXXXXX
$ XXXXXXX
X STATUTE EORH
E.L. EACH ACCIDENT $ 1,000,000
E.L. DISEASE - EA EMPLOYEE $ 1,000,000
E.L. DISEASE - POLICY LIMIT $ 1.000.000
$3,000,000 PER CLAIM; ::3,000,000
ANNUAL AGGREGATE
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached N more space is required) THIS CERTIFICATE SUPERSEDES ALL PREVIOUSLY ISSUED CERTIFICATES FOR THIS HOLDER, APPLICABLE TO THE CARRIERS LISTED AND THE POLICY TERM(S) REFERENCED.
RE: 3010.0103115.000 THE GOLDEN AVENUE BRIDGE REHABILITATION PROJECT & ORANGE COUNTY BIKEWAY LOOP SEGMENT D. THE CITY OF PLACENTIA, ITS OFFICERS,
OFFICIALS, EMPLOYEES, AND VOLUNTEERS ARE ADDITIONAL INSUREDS AS RESPECTS GENERAL LIABILITY AND AUTO LIABILITY, AND THESE COVERAGES ARE PRIMARY AND NON-CONTRIBUTORY, IF REQUIRED BY WRITTEN CONTRACT. WAIVER OF SUBROGATION APPLIES TO GENERAL LIABILITY, AUTO LIABILITY AND WORKERS COMPENSATION/EMPLOYER'S LIABILITY WHERE ALLOWED BY STATE LAW AND IF REQUIRED BY WRITTEN CONTRACT. RETROACTIVATE DATE: FULL PRIOR ACTS.
CERTIFICATE HOLDER
22618749
CITY OF PLACENTIA
401 E. CHAPMAN AVE.,
PLACENTIA, CA 92870
ACORD 25 (2016/03)
CANCELLATION See Attachments
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE'
© 1988C2015'ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
Attachment Code: D581105 Certificate ID: 22618749
Additional Insured — Owners, Lessees Or Contractors —
Scheduled Person Or Organization
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
Policy No. GL03021088
This endorsement modifies insurance provided under the:
Commercial General Liability Coverage Part
Name Of Additional Insured Person(s)
Or Organization(s):
Any person or organization you are required to add
as an additional insured under a written contract or
written agreement.
Effective Date: 11/1/2025
SCHEDULE
Location(s) Of Covered Operations
ALL LOCATIONS
A. Section 11 — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule of this endorsement, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by:
1. Your acts or omissions; or
2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated in such Schedule.
B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply:
This insurance does not apply to "bodily injury" or "property damage" occurring after:
1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or
2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project.
All other terms, conditions, provisions and exclusions of this policy remain the same.
U -GL -2169-A CW (02/19)
Includes copyrighted material of Insurance Services Office, Inc., with its permission.
Attachment Code: D581105 Certificate ID: 22618749
Additional Insured — Owners, Lessees Or Contractors —
Completed Operations
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
Policy No. GL03021088
This endorsement modifies insurance provided under the:
Commercial General Liability Coverage Part
Effective Date: 11/1/2025
SCHEDULE
Name Of Additional Insured Person(s) Location And Description Of Completed Operations Or Organization(s):
Any person or organization you are required to add ALL LOCATIONS as an additional insured under a written contract or
written agreement.
Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule of this endorsement, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the location designated and described in such Schedule, performed for that additional insured and included in the "products -completed operations hazard".
All other terms, conditions, provisions and exclusions of this policy remain the same.
U -GL -2168-A CW (02/19)
Includes copyrighted material of Insurance Services Office, Inc., with its permission.
00 00
Attachment Code: D582601 Certificate ID: 22618749
POLICY NUMBER: GL03021088
Other Insurance Amendment - Primary And
Non -Contributory
ZURICH
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
This endorsement modifies insurance provided under the: Commercial General Liability Coverage Part
1. The following paragraph is added to the Other Insurance Condition of Section IV - Commercial General Liability Conditions:
This insurance is primary insurance to and will not seek contribution from any other insurance available to an additional insured under this policy provided that:
a. The additional insured is a Named Insured under such other insurance; and b. You are required by a written contract or written agreement that this insurance would be primary and would not seek contribution from any other insurance available to the additional insured.
2. The following paragraph is added to Paragraph 4.b. of the Other Insurance Condition of Section IV - Commercial General Liability Conditions:
This insurance is excess over:
Any of the other insurance, whether primary, excess, contingent or on any other basis, available to an additional insured, in which the additional insured on our policy is also covered as an additional insured on another policy providing coverage for the same "occurrence", offense, claim or "suit". This provision does not apply to any policy in which the additional insured is a Named Insured on such other policy and where our policy is required by written contract or written agreement to provide coverage to the additional insured on a primary and non-contributory basis.
All other terms and conditions of this policy remain unchanged.
U -GL -1327-B CW (04/13)
Attachment Code: D581108 Certificate ID: 22618749
POLICY NUMBER: BAP 3021090 COMMERCIAL AUTO
CA 20 48 10 13
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
DESIGNATED INSURED FOR
COVERED AUTOS LIABILITY COVERAGE
This endorsement modifies insurance provided under the following:
AUTO DEALERS COVERAGE FORM
BUSINESS AUTO COVERAGE FORM
MOTOR CARRIER COVERAGE FORM
With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement.
This endorsement identifies person(s) or organization(s) who are "insureds" for Covered Autos Liability Coverage under the Who Is An Insured provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form.
This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below.
Endorsement Effective Date: 11/1/2025
SCHEDULE
Name Of Person(s) Or Organization(s): Any person or organization you are required to provide additional insured status or additional insured status on a primary, non-contributory basis, in a written contract or written agreement executed prior to loss, except where such contract or agreement is prohibited by law.
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
Each person or organization shown in the Schedule is an "insured" for Covered Autos Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured provision contained in Paragraph A.1. of Section II - Covered Autos Liability Coverage in the Business Auto and Motor Carrier Coverage Forms and Paragraph D.2. of Section I - Covered Autos Coverages of the Auto Dealers Coverage Form
Attachment Code: D590579 Certificate ID: 22618749
Policy No.
BAP 3021090
Coverage Extension
Endorsement
Eff. Date of Pol.
11/1/2025
Exp. Date of Pol.
11/1/2026
Eff. Date of End.
11/1/2025
Producer No.
37385000
Add'I. Prem
INCL
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
This endorsement modifies insurance provided under the:
Business Auto Coverage Form
Motor Carrier Coverage Form
Return Prem.
A. Amended Who Is An Insured
1. The following is added to the Who Is An Insured Provision in Section II — Covered Autos Liability Coverage:
The following are also "insureds":
a. Any "employee" of yours is an "insured" while using a covered "auto" you don't own, hire or borrow for acts performed within the scope of employment by you. Any "employee" of yours is also an "insured" while operating an "auto" hired or rented under a contract or agreement in an "employee's" name, with your permission, while performing duties related to the conduct of your business. b. Anyone volunteering services to you is an "insured" while using a covered "auto" you don't own, hire or borrow to transport your clients or other persons in activities necessary to your business. c. Anyone else who furnishes an "auto" referenced in Paragraphs A.1.a. and A.1.b. in this endorsement. d. Where and to the extent permitted by law, any person(s) or organization(s) where required by written contract or written agreement with you executed prior to any "accident", including those person(s) or organization(s) directing your work pursuant to such written contract or written agreement with you, provided the "accident" arises out of operations governed by such contract or agreement and only up to the limits required in the written contract or written agreement, or the Limits of Insurance shown in the Declarations, whichever is less.
2. The following is added to the Other Insurance Condition in the Business Auto Coverage Form and the Other Insurance — Primary and Excess Insurance Provisions Condition in the Motor Carrier Coverage Form:
Coverage for any person(s) or organization(s), where required by written contract or written agreement with you executed prior to any "accident", will apply on a primary and non-contributory basis and any insurance maintained by the additional "insured" will apply on an excess basis. However, in no event will this coverage extend beyond the terms and conditions of the Coverage Form.
U -CA -424-F CW (04-14)
Includes copyrighted material of Insurance Services Office, Inc., with its permission.
F)
Attachment Code: D581100 Certificate ID: 22618749
POLICY NO. WC 3021089
WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC000313
(Ed. 4-84) 1
WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT
We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement form us.)
This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule.
Schedule
If you are required by a written contract or agreement, which is executed before a loss, to waive your rights of recovery from others, we agree to waive our rights of recovery.
Attachment Code: D581097 Certificate ID: 22618749
POLICY NUMBER: GLO3021088
COMMERCIAL GENERAL LIABILITY
CG 24 04 05 09
WAIVER OF TRANSFER OF RIGHTS OF RECOVERY
AGAINST OTHERS TO US
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART
SCHEDULE
Name Of Person Or Organization: If you are required by a written contract or agreement, which is executed before a loss, to waive your rights of recovery from others, we agree to waive our rights of recovery.
I Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV - Conditions:
We waive any right of recovery we may have against the
person or organization shown in the Schedule above because of payments we make for injury or damage arising out of your ongoing operations or "your work" done under a contract with that person or organization and included in the
"products -completed operations hazard". This waiver applies only to the person or organization shown in the Schedule above.
CG 24 04 05 09
© Insurance Services Office, Inc., 2008
Attachment Code: D581101 Certificate ID: 22618749
POLICY NUMBER: BAP 3021090 COMMERCIAL AUTO
CA 04 44 10 13
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
WAIVER OF TRANSFER OF RIGHTS OF RECOVERY
AGAINST OTHERS TO US (WAIVER OF SUBROGATION)
This endorsement modifies insurance provided under the following:
AUTO DEALERS COVERAGE FORM
BUSINESS AUTO COVERAGE FORM
MOTOR CARRIER COVERAGE FORM
With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement.
This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below.
Endorsement Effective Date: 11/1/2025
SCHEDULE
Name(s) Of Person(s) Or Organization(s): If you are required by a written contract or agreement, which is executed before a loss, to waive your rights of recovery from others, we agree to waive our rights of recovery.
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
The Transfer Of Rights Of Recovery Against
Others To Us condition does not apply to the
person(s) or organization(s) shown in the Schedule,
but only to the extent that subrogation is waived
prior to the "accident" or the "loss" under a contract
with that person or organization.
Attachment Code: D582603 Certificate ID: 22618749
Notification to Others of Cancellation, Nonrenewal
or Reduction of Insurance
1 Policy No,
GL03021088
Eff. Date of Pol.
11/1/2025
Exp. Date of Pol.
11/1/2026
Eff. Date of End.
11/1/2025
Producer No.
37385000
Add'I. Prem
N/A
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
This endorsement modifies insurance provided under the:
Commercial General Liability Coverage Part
Liquor Liability Coverage Part
Products/Completed Operations Liability Coverage Part
Return Prem.
N/A
A. If we cancel or non -renew this Coverage Part(s) by written notice to the first Named Insured for any reason other than nonpayment of premium, we will mail or deliver a copy of such written notice of cancellation or non -renewal:
1. To the name and address corresponding to each person or organization shown in the Schedule below; and
2. At least 10 days prior to the effective date of the cancellation or non -renewal, as advised in our notice to the first Named Insured, or the longer number of days notice if indicated in the Schedule below.
B. If we cancel this Coverage Part(s) by written notice to the first Named Insured for nonpayment of premium, we will mail or deliver a copy of such written notice of cancellation to the name and address corresponding to each person or organization shown in the Schedule below at least 10 days prior to the effective date of such cancellation.
C. If coverage afforded by this Coverage Part(s) is reduced or restricted, except for any reduction of Limits of Insurance due to payment of claims, we will mail or deliver notice of such reduction or restriction:
1. To the name and address corresponding to each person or organization shown in the Schedule below; and
2. At least 10 days prior to the effective date of the reduction or restriction, or the longer number of days notice if indicated in the Schedule below.
D. If notice as described in Paragraphs A., B. or C. of this endorsement is mailed, proof of mailing will be sufficient proof of such notice.
SCHEDULE
Name and Address of Other Person(s)
/ Opaanization(s):
Number of Days Notice:
As required by written contract, agreement or permit 90 days' notice All other terms and conditions of this policy remain unchanged.
U -GL -1447-A CW (05/10)
Includes copyrighted material of Insurance Services Office, Inc., with its permission.
Attachment Code: D589042 Certificate ID: 22618749
WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY U -WC -3078-A CW (08/17)
CANCELLATION AND NONRENEWAL NOTICE ENDORSEMENT
A. Part Six — Conditions, Paragraph D.2. is replaced by the following:
D. Cancellation
2. We may cancel this policy. We must mail or deliver to you not less than 90 days advance written notice stating when the cancellation is to take effect except for cancellation for non-payment of premium. If we cancel this policy for non-payment of premium we must mail or deliver to you not less than 10 days advance written notice. Mailing that notice to you at your mailing address shown in Item 1 of the Information Page will be sufficient to prove notice.
B. Part Six — Conditions, Paragraph F. is added.
F. Nonrenewal Notice
We will mail or deliver to you not less than 90 days advance written notice of our intention to nonrenew this policy. Mailing that notice to you at your mailing address shown in Item 1 of the Information Page will be sufficient to prove notice.
All other terms, conditions, provisions and exclusions of this policy remain the same.
U -WC -3078-A CW (08/17)
Attachment Code: D604303 Certificate ID: 22618749
Notification to Others of Cancellation, Nonrenewal
or Reduction of Insurance
Policy No.
BAP 3021090
Eff. Date of Pol.
11/1/2025
Exp. Date of Pol.
11/1/2026
Eff. Date of End.
11/1/2025
Producer No.
37385000
Add'I. Prem
$ INCL
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
This endorsement modifies insurance provided under the:
Commercial Automobile Coverage Part
ZURICH
Return Prem.
A. If we cancel or non -renew this Coverage Part by written notice to the first Named Insured for any reason other than nonpayment of premium, we will mail or deliver a copy of such written notice of cancellation or non -renewal:
1. To the name and address corresponding to each person or organization shown in the Schedule below; and
2. At least 10 days prior to the effective date of the cancellation or non -renewal, as advised in our notice to the first Named Insured, or the longer number of days notice if indicated in the Schedule below.
B. If we cancel this Coverage Part by written notice to the first Named Insured for nonpayment of premium, we will mail or deliver a copy of such written notice of cancellation to the name and address corresponding to each person or organization shown in the Schedule below at least 10 days prior to the effective date of such cancellation.
C. If coverage afforded by this Coverage Part is reduced or restricted, except for any reduction of Limits of Insurance due to payment of claims, we will mail or deliver notice of such reduction or restriction:
1. To the name and address corresponding to each person or organization shown in the Schedule below; and
2. At least 10 days prior to the effective date of the reduction or restriction, or the longer number of days notice if indicated in the Schedule below.
D. If notice as described in Paragraphs A., B. or C. of this endorsement is mailed, proof of mailing will be sufficient proof of such notice.
SCHEDULE
Name and Address of Other Person(s) / Organization(s):
AS REQUIRED BY WRITTEN CONTRACT OR AGREEMENT
All other terms and conditions of this policy remain unchanged.
Includes copyrighted material of Insurance Services Office, Inc., with its permission.
Number of Days
Notice: