AGREEMENT FOR DESIGN PROFESSIONAL SERVICES
This Agreement is made and entered into as of the _ day of _ , 2022, by and between the City of Pleasant Hill ("City") and Park Engineering., ("Consultant").
RECITALS
Consultant is specially trained, experienced and competent to perform the special services which will be required by this Agreement; and B. Consultant possesses the skill, experience, ability, background, certification and knowledge to provide the services described in this Agreement on the terms and conditions described herein.
AGREEMENT
1. Scope of Services. The Consultant shall furnish the following services in a professional manner:
"Consultant shall perform the services described on Exhibit A which is attached hereto and incorporated herein by reference. Consultant shall provide said services at the time, place, and in the manner specified in Exhibit A, subject to the direction of the City through its staff that it may provide from time to time. Consultant shall, without additional compensation, correct or revise any errors or deficiencies in its studies, reports, designs, drawings, specifications and other services."
2. Time of Performance. The services of Consultant are to commence upon execution of this Agreement and shall continue until all authorized work is approved by the City. All such work shall be completed no later than June 30, 2023.
3. Compensation. Compensation to be paid to Consultant shall be in accordance with the Schedule of Charges set forth in Exhibit A, which is attached hereto and incorporated herein by reference. In no event shall Consultant's compensation exceed $35,000 without additional authorization from the City. Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to the City at the time of payment.
4. Method of Payment. Consultant shall submit monthly billings to City describing the work performed during the preceding month. Consultant's bills shall include a brief description of the services performed, the date the services were performed, the number of hours spent and by whom, and a description of any reimbursable expenditures. City shall pay Consultant no later than 30 days after approval of the monthly invoice by City staff. When payments made by City equal 90% of the maximum fee provided for in this Agreement, no further payments shall be made until the final work under this Agreement has been accepted by City.
Ownership of Documents. All plans, studies, documents and other writings prepared by and for Consultant, its officers, employees and agents and subcontractors in the course of implementing this Agreement, except working notes and internal documents, shall become the property of the City upon payment to Consultant for such work, and the City shall have the sole right to use such materials in its discretion without further compensation to Consultant or to any other party. Consultant shall, at Consultant's expense, provide such reports, plans, studies, documents and other writings to City upon written request. 6 Independent Contractor. It is understood that Consultant, in the performance of the work and services agreed to be performed, shall act as and be an independent contractor and shall not act as an agent or employee of the City.
Consultant shall obtain no rights to retirement benefits or other benefits which accrue to City's employees, and Consultant hereby expressly waives any claim it may have to any such rights.
7. Interest of Consultant. Consultant (including principals, associates and professional employees) covenants and represents that it does not now have any investment or interest in real property and shall not acquire any interest, direct or indirect, in the area covered by this Agreement or any other source of income, interest in real property or investment which would be affected in any manner or degree by the performance of Consultant's services hereunder. Consultant further covenants and represents that in the performance of its duties hereunder no person having any such interest shall perform any services under this Agreement.
Consultant is not a designated employee within the meaning of the Political Reform Act because Consultant:
will conduct research and arrive at conclusions with respect to his/her rendition of information, advice, recommendation or counsel independent of the control and direction of the City or of any City official, other than normal agreement monitoring; and
2 b. possesses no authority with respect to any City decision beyond rendition of information, advice, recommendation or counsel. (FPPC Reg. 18700(a)(2).)
Professional Ability of Consultant. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall therefore provide properly skilled professional and technical personnel to perform all services under this Agreement. All work performed by Consultant under this Agreement shall be in accordance with applicable legal requirements and shall meet the standard of quality ordinarily to be expected of competent professionals in Consultant's field of expertise.
9. Indemnity.
a. To the fullest extent permitted by law, Consultant shall defend (with counsel of City's choosing), indemnify and hold the City, its officials, officers, employees, volunteers, and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Consultant, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Consultant's services, the project or this Agreement, including without limitation the payment of all damages, expert witness fees and attorney's fees and other related costs and expenses. Consultant's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by Consultant, the City, its officials, officers, employees, agents, or volunteers.
b. If Consultant's obligation to defend, indemnify, and/or hold harmless arises out of Consultant's performance of "design professional" services (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Consultant's indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, and, upon Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant's liability for such claim, including the cost to defend, shall not exceed the Consultant's proportionate percentage of fault.
3 The provisions of this section survive completion of the services or the termination of this contract.
10. Insurance Requirements.
a. Consultant, at Consultant's own cost and expense, shall procure and maintain, for the duration of the contract, the following insurance policies. i. Workers' Compensation Coverage. Consultant shall maintain Workers' Compensation Insurance and Employer's Liability Insurance for his/her employees in accordance with the laws of the State of California. In addition, Consultant shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of cancellation or non-renewal of all Workers' Compensation policies must be received by the City at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees and volunteers for losses arising from work performed by Consultant for City.
ii. General Liability Coverage. Consultant shall maintain commercial general liability insurance in an amount not less than two million dollars ($2,000,000) per occurrence for bodily injury, personal injury and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit.
ili. Automobile Liability Coverage. Consultant shall maintain automobile liability insurance covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired and non-owned vehicles, in an amount of not less than two million dollars ($2,000,000) combined single limit for each occurrence.
iv. Professional Liability Coverage. Consultant shall maintain professional errors and omissions liability insurance for protection against claims alleging negligent acts, errors or omissions which may arise from Consultant's operations under this Agreement, whether 4 such operations be by the Consultant or by its employees, subcontractors, or suncon antar he, amount of hid is ance shall annual aggregate basis, or a combined single-limit per occurrence basis.
Policy Endorsements. Each general liability and automobile liability insurance policy shall be with insurers possessing a Best's rating of no less than A:VII and shall be endorsed with the following specific language:
i. The City of Pleasant Hill, its elected or appointed officers, officials, employees, agents and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the Consultant, including materials, parts or equipment furnished in connection with such work or operations.
Il. This policy shall be considered primary insurance as respects the City, its elected or appointed officers, officials, employees, agents and volunteers. Any insurance maintained by the City, including any self-insured retention the City may have, shall be considered excess insurance only and shall not contribute with it.
iii. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company. iv. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected or appointed officers, officials, employees, agents or volunteers.
V. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days written notice has been received by the City.
Deductibles and Self-Insured Retentions. Any deductibles or self- insured retentions must be dedlared to and approved by the City. At the City's option, Consultant shall demonstrate financial capability for payment of such deductibles or self-insured retentions.
d. Certificates of Insurance and Endorsements. Consultant shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. Certificates of such insurance shall be 5 filed with the City on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with the City at all times during the term of this Agreement.
1l. Compliance with Laws. Consultant shall use the standard of care in its profession to comply with all applicable federal, state and local laws, codes, ordinances and regulations.
12. Licenses. Consultant represents and warrants to City that it has all licenses, permits, qualifications, insurance and approvals of whatsoever nature which are legally required of Consultant to practice its profession. Consultant represents and warrants to City that Consultant shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement, any licenses, permits, insurance and approvals which are legally required of Consultant to practice its profession. Consultant shall maintain a City of Pleasant Hill business license.
13. Controlling Law Venue. This Agreement and all matters relating to it shall be governed by the laws of the State of California and any action brought relating to this Agreement shall be held exclusively in a state court in the County of Contra Costa, Martinez, California.
14. Written Notification. Any notice, demand, request, consent, approval or communication that either party desires or is required to give to the other party shall be in writing and either served personally or sent prepaid, first class mail.
Any such notice, demand, etc. shall be addressed to the other party at the address set forth herein below. Either party may change its address by notifying the other party of the change of address. Notice shall be deemed communicated within 48 hours from the time of mailing if mailed as provided in this section.
If to City: City of Pleasant Hill
310 Civic Drive
Pleasant Hill, CA 94523-3323
If to Consultant: Park Engineering
372 Village Square
Orinda, CA 94563
15. Consultant's Books and Records.
a. Consultant shall maintain any and all ledgers, books of account, 6 invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services, or expenditures and disbursements charged to City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant to this Agreement.
Consultant shall maintain all documents and records which demonstrate performance under this Agreement for a minimum period of three (3) years, or for any longer period required by law, from the date of termination or completion of this Agreement.
Any records or documents required to be maintained pursuant to this Agreement shall be made available for inspection or audit, at any time during regular business hours, upon written request by the City Manager, City Attorney, City Auditor or a designated representative of these officers.
Copies of such documents shall be provided to the City for inspection at City Hall when it is practical to do so. Otherwise, unless an alternative is mutually agreed upon, the records shall be available at Consultant's address indicated for receipt of notices in this Agreement.
d. Where City has reason to believe that such records or documents may be lost or discarded due to dissolution, disbandment or termination of Consultant's business, City may, by written request by any of the above named officers, require that custody of the records be given to the City and that the records and documents be maintained in City Hall. Access to such records and documents shall be granted to any party authorized by Consultant, Consultant's representatives, or Consultant's successor- in-interest.
16. Entire Agreement. This Agreement constitutes the complete and exclusive statement of Agreement between the City and Consultant. All prior written and oral communications, including correspondence, drafts, memoranda, and representations, are superseded in total by this Agreement.
17. Amendments. This Agreement may be modified or amended only by a written document executed by both Consultant and City and approved as to form by the City Attorney.
18. Waiver. No failure on the part of either party to exercise any right or remedy hereunder shall operate as a waiver of any other right or remedy that party may have hereunder.
7 19. Litigation Expenses and Attorneys' Fees. If either party to this Agreement commences any legal action against the other party arising out of this Agreement, the prevailing party shall be entitled to recover its reasonable litigation expenses, including court costs, expert witness fees, discovery expenses, and attorneys' fees.
20. Execution. This Agreement may be executed in several counterparts, each of which shall constitute one and the same instrument and shall become binding upon the parties when at least one copy hereof shall have been signed by both parties hereto. In approving this Agreement, it shall not be necessary to produce or account for more than one such counterpart.
21. Assignment and Subcontracting. The parties recognize that a substantial inducement to City for entering into this Agreement is the professional reputation, experience and competence of Consultant. Assignments of any or all rights, duties or obligations of the Consultant under this Agreement will be permitted only with the express consent of the City. Consultant shall not subcontract any portion of the work to be performed under this Agreement without the written authorization of the City. If City consents to such subcontract, Consultant shall be fully responsible to City for all acts or omissions of the subcontractor. Nothing in this Agreement shall create any contractual relationship between City and subcontractor nor shall it create any obligation on the part of the City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise is required by law.
22. Termination. This Agreement may be terminated immediately for cause or by either party without cause upon fifteen days' written notice of termination.
Upon termination, Consultant shall be entitled to compensation for services performed up to the effective date of termination.
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the date first written above.
CITY OF PLEASANT HILL: CONSULTANT:
By: Jaemes Pal Jaemin Park
June Catalano
City Manager Title: President
Business License # 0000040508
8 APPROVED AS TO FORM: ATTEST:
Janet E. Coleson Danielle K. Habr
City Attorney City Clerk
Attachments: Exhibit A Cost Proposal
9 CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE I hereby certify that in the performance of the work for which this Agreement is entered into, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of the State of California.
Executed on this. _ day of - 20_, at Pleasant Hill,
California.
[Add Consultant's name and title]
10 EXHIBIT A
PARK
ENGINEERING
August 15, 2022
Ann Page, PE, CFM
Maintenance Superintendent
City of Pleasant Hill
310 Civic Drive
Pleasant Hill, CA 94523
RE: Construction Inspection Services for 2022 Annual Paving Project Dear Ann:
Park Engineering, Inc. is pleased to submit this proposal to provide construction inspection services to the City of Pleasant Hill for the 2022 Annual Paving Project. Depending on the timing of the start of the project, either Dante Morabe or Chris Kinser will be the inspector for the project. Both Dante and Chris have over 20 years of experience in construction management and inspection and have worked on numerous local agency projects for pavement rehabilitation including base failures, full depth reclamation (FDR) and grind and overlay with HMA and RHMA.
As the Project Manager, I will oversee Park Engineering staff and ensure the City has the resources needed to complete the project.
Resumes for both Dante and Chris are included along with a cost proposal for an estimated 30 working days plus overtime hours as discussed.
Should you have any questions or need additional information, please do not hesitate to contact me at (925) 818-3756 or [email protected].
Sincerely,
President
Orinda Office
372 Village Square
Orinda, CA 94563
Tel: 925-257-2508
Fax: 925-401-7030
Emerville Office
3960 Adeline Street, #3
Emeryville, CA 94608
Tel: 925-257-2508
Fax: 925-401-7030
PARK
Construction Inspection Services for
ENGINEERING
2022 Annual Paving
RESUME
DANTE MORABE
CONSTRUCTION MANAGER / SENIOR CONSTRUCTION INSPECTOR
Years of Experience
23 Key Qualifications
Dante Morabe has spent over 23 years in the construction industry working as a construction project manager/supervising construction inspector/inspector/materials and testing technician for Contra Costa County Public Works Department. He is proficient in the execution of construction contracts, as well as construction inspection at the county, state and federal levels. His experience includes oversight for projects that include concrete bridges, storm drain pipeline, storm water treatment, roadway construction/rehabilitation, parks, and ADA curb ramps. Dante can work both in a team setting in many roles as a supervisor, manager, and inspector. He can work on many different types of projects and works diligently to complete projects successfully, on time and within budget. He can work independently with the contractor and as a member of a team to get the project to a successful completion. In addition, Dante has supervised the construction division inspectors and on-call inspectors for the past 17 years. During this time he has not only provided construction management for various capital projects but has also overseen construction of developer funded civil ordinance projects, encroachment utility permit inspections, flood control inspections, training inspectors and coordinating with utility companies on various projects.
Project Experience
• 2010-2021 Annual Surface Treatment Projects - $250K-7.0M Dante was the Construction Project Manager on these projects throughout Contra Costa County. He oversaw the management of these projects and a staff of construction inspectors as well as on-call materials and testing technicians. His duties included management of the contract according to the Standard Specifications; design plan review, submittal review, tracking of quantities, progress payments and change order review. These projects ranged from Asphalt Rubber Cape Seals, Terminal Blend Cape Seals, Slurry Seals, Micro Surface, seals with fiber, installation of asphalt inlays and overlays, base failure repairs, and edge grinding. These projects also included installation and raising of monuments/valves, replacing thermos plastic striping, and installation of green bike lanes.
Dante keep the public informed of upcoming work by sending out notifications to the residents, working with the county's public relations staff to post on local websites, and board of supervisors representatives. Highlight project is 2021 Surface Treatment Project $7.OM, which consisted of an Asphalt Rubber Cape Seal, base failures, edge grinding, asphalt cul-de-sac inlays, monument raising and installation, re-installing thermos plastic striping and installing new green thermoplastic bike lanes. This project was the largest surface treatment (cape seal) project in the county's history.
Project completed under budget by $565K
2016-17, 2019, 2021 Curb Ramp Projects - $225K-1.2M
Dante was the Construction Project Manager on these projects for Contra Costa County Public Works. He oversaw the management of these projects and a staff of construction inspectors. His duties included management of the contract according to the Standard Specifications of the project; design plan review, submittal review, hold pre-construction meeting, tracking of quantities, progress payments and change order review. These projects included new concrete curb & gutter, ADA compliant curb ramps, valley gutters, and replacement of old signs to new MUTCD compliant signs.
Dante worked closely with businesses and residents to ensure they had access to their driveways and walkway entrances. Highlight project is the Main Street Byron Project, which included PARK
ENG VEERING
RESUME
replacement of curb & gutter, sidewalk, tree well construction and ADA curb ramps and working closely with businesses to ensure customers had access. During construction, an old underground gas-holding tank was discovered; Dante worked closely with environment health department to gather the correct permits and ensure disposal paperwork was completed. • 2020-2021 Rodeo Projects - $500K
As the construction project manager Dante ensured these projects were built per plan and worked closely with the design engineer(s) when changes needed to be made. He also coordinated with the utility companies to relocate some of their facilities. Projects consisted of installing pedestrian refuge area, bulb outs, curb & gutter, sidewalk, ADA compliant curb ramps, solar and hardwired rectangular rapid flashing beacon system (RRFBs) with passive detection system, trenching, installation of conduits, electrical cable, pull boxes, electrical service pedestals, large storm water treatment basin, landscaping, Midwest Guardrail, ADA compliant path and soldier pile walls, and sign installation.
• 2020-2021 Trail Crosswalk Projects - $190-200K
Project locations were in Bay Point and Walnut Creek. Dante was the project manager and worked closely with other agencies (EBMUD and EBRPD) to ensure these projects were completed and with little disturbance to the trail users and a nearby elementary school. Projects consisted of pavement widening, construction of bulb outs, asphalt path, HMA dike, curb ramps, driveway conforms, and installation of pedestrian activated flashing beacons.
• 2021 Alhambra Valley Road Realignment Project - $430K Dante was the Construction Project Manager on this project located in Briones area. He oversaw the management of this project and supervised the onsite inspector. This project consisted of realigning Alhambra Valley Road away from Pinole Creek's embankment, including roadway excavation and reconstruction, asphalt pavement, establishing a roadside ditch, slope grading, TWEF construction fencing, fence relocation, roadway signage and striping. Dante worked closely with biologist to ensure site was safe and monitored during construction. • 2019-2020 Safety Improvement Projects - $880K-1.30M
One federally funded project located on Marsh Creek Rd in Clayton consisted of centerline rumble strip placement and upgrade of existing regulatory and warning signs to diamond grade reflectivity, install wood pole and streetlight installation and two solar flashing beacons. Second project was locally funded and located on San Pablo Dam Rd, El Sobrante and consisted of centerline rumble strip with channelizers, reconstructing two median islands, replacing roadside signs to meet new retro-reflectivity standards, installation of speed feedback signs, slurry seal, thermoplastic striping and green bike lanes.
• 2020 Countywide Guardrail Project - $1.2M
Dante was the construction project manager supervising three inspectors on this federally funded project. This project was located in Clayton, El Sobrante and Byron areas and work was completed during both night and day shifts due to traffic safety concerns. The county's existing guardrails were upgraded to new standards with either FLEAT or SKT terminal systems and adjusting, replace, or transitioning existing Metal Beam Guardrail (MBGR) to Midwest Guardrail System (MGS). He also reviewed submittals, reviewed CCO's on T&M, reviewed pay estimates, and ensured required paperwork was in the project binder.
• 2018-2019 Trash Capture Projects - $120-170K
The work to be done generally consists of providing and installing full trash capture units for 259 inlets, 160 connector pipe screens and 205 automatic retractable screens throughout contra Costa County. Dante provided construction management and supervised an inspector.
PARK
RESUME
• 2019-2020 Storm Drain Repair Projects - $190-210K
The work consisted of replacing a 48" culvert at two sites, dewatering, trench shoring, concrete slurry backfill, and hot mix asphalt in Antioch. Second project replaced a 36" culvert outfall, re- establishing, and stabilizing the embankment using Rock Slope Protection, temporary water diversion /dewatering, removal of existing pipe, installing inlet, tree planting and seeding the embankment in Martinez. Dante managed both projects with the help of county inspectors. • 2019 Camino Tassajara Bike Lane Closure - $2.6M
As the construction project manager, Dante over saw the construction of roadway widening, drainage improvements, roadside grading, slurry seal, slope grading, cattle fence installation, roadway signing and striping. Dante was also instrumental in getting unforeseen issues taken care through CCO's, for example unearthing an old concrete road during road widening, roadside ditch grading work within burrowing squirrels habitat, and correct driveway grading issues onsite. He also ensured traffic control was more than adequate due to the high bike usage of this roadway. • 2018 Tice Valley Road Linear Park - $650K
The work consisted of providing an asphalt concrete and colored concrete pedestrian path, bus turnout, roadway construction, realignment, flashing beacon pedestrian crossing, landscaping, bus shelter, specialty split wood fence, signing and striping. Dante was the construction project manager and had a civil and landscape inspectors assigned to this project. Dante worked with the design engineer, contractor and inspector to correct an asphalt design issue to ensure the project continued on schedule. Dante provided oversight on submittal review, review progress reports, and review of CCO"s.
ORDINANCE PROJECT EXPERIENCE
• Supervising Construction Inspector and Inspector (Dougherty Valley Development), Contra Costa County, San Ramon, CA, $250M
Dante was the Supervising Construction Inspector for Contra Costa County Public Works on a variety of ordinance projects (subdivisions, road acceptance, drainage area, parks, etc.) totaling in construction cost of $250,000,000. These were developer-funded projects and consisted of County oversight and inspection of brand new county roadways, traffic signal installations, various types of box culvert construction, drainage basins, concrete box girder bridge construction, pedestrian and utility bridges, parks, storm drain and new utility installations. Some specialty projects included a large community park with multiple artificial turf and grass soccer fields, baseball field, water park, playground, and trails. Responsibilities also included overseeing day-to-day construction activities, supervising both County and consultant inspectors, and coordination with developers, utility companies, local City representatives, and closeout acceptance with the City of San Ramon and Contra Costa County. Memorandum of Understanding (MOU) between the developer, county and city ensured the projects would be built by the developer, inspected and accepted by the county, then accepted and annexed to the city. He was also responsible for SWPPP inspections and annual SWPPP reporting for the MRP.
• Supervising Construction Inspector and Inspector (Alamo Creek, Wendt Ranch, Intervening Properties), Contra Costa County, Danville, CA, $27.5M
Dante was the Supervising Construction Inspector for Contra Costa County Public Works on a variety of ordinance projects (subdivisions, road acceptance, drainage area, parks, etc.) for three major development projects totaling in construction cost of $25,000,000. These were developer-funded projects and consisted of County oversight and inspection of brand new county roadways, traffic signal installations, drainage basins, bridge construction, utility bridge, parks, and storm drain. Some specialty project included a large detention basin construction with major efforts conducted to PARK
ENG NEERING
RESUME
protect endangered species of red-legged frogs, which were relocated with the help of a staff of biologists during the night. Responsibilities also included overseeing day-to-day construction activities, supervising both county and consultant inspectors, and coordination with developers, utility companies, and county maintenance supervisor on closeout acceptance.
PARK
ENGINEER A
RESUME
CHRIS KINSER, ASSISTANT RESIDENT ENGINEER
Years of Experience
25 Education
B.S. Construction Management, California State University, Chico, 1996 Certifications and Training
40 hour HazWOPER and HazMat certifications
Caltrans Stormwater Management SWPPP training
COGZ CMMS Preventive Maintenance software
Key Qualifications
Chris has 25 years of experience in transportation and infrastructure construction, including highways and bridges, parking lots, athletic fields, residential streets, and commercial sites. Acting in the capacity of assistant resident engineer, construction inspector, and project manager for the contractor, Chris has managed highway interchanges, roadway widenings, emergency slide and flood repairs, box culverts, and multiple utility installations/relocations.
Chris has experience supervising construction staff and has assisted to complete projects on schedule and within budget in accordance with contract requirements. He has performed inspection of construction activities to ensure conformance with approved contract document and has experience in review of construction contracts, scope of work, labor and insurance requirements. He has worked with private companies, various utility companies, numerous agencies and the public. His experience, ability to work well with others and attention to detail impact his projects positively.
Chris is familiar with the Caltrans Standard Specifications, Standard Plans, Construction Manual, Local Assistance Procedures Manual, and the "Greenbook" Standard Specifications for Public Works Construction.
Project Experience
• 2nd Street & Grand Ave Intersection Improvement Project, City of San Rafael, CA - $1M Assistant resident engineer/construction inspector for this traffic signal improvement to this busy intersection with new & improved curb ramps while widening the northbound approach on Grand Ave.
The project also upgraded and replaced all the traffic signal components. Daily traffic control and coordination with adjacent businesses was also a critical component of the project work. • John Daly Blvd Streetscape Improvements Project (Fed funded), City of Daly City, CA - $3.3M Assistant resident engineer/construction inspector for streetscape improvements that included roadway modifications, installation of a concrete walkway, ADA compliant ramps, landscaping, irrigation using recycled water, bioswales, Class Il bicycle lanes, and pedestrian amenities such as benches and trash/recycling receptacles. The project narrowed the center median, installed street lights on the outside medians, installed new decorative street lights for the pedestrian walkway, modified traffic signals at three intersections, repaired base sections of roadway with deep lift HMA, resurfaced the entire length of the project with HMA, installed new striping and decorative stamped AC crosswalks. The project required coordination with Caltrans, Samtrans, SF MUNI, utility companies, and various departments within the City.
• Detroit Avenue Bicycle and Pedestrian Improvements Project (federally funded), City of Concord, CA - $4M
PARK
ENG NEERING
RESUME
Assistant resident engineer/ construction inspector for this federally funded (OBAG) project constructing roadway and streetscape improvements on Detroit Avenue from Monument Blvd. to Clayton Road. Work on this $4M project involves full street rehabilitation including, grading, AC paving, signals and lighting, new curb, gutter and sidewalks, new curb ramps, drainage improvements, irrigation and lighting, and enhanced striping and pavement markings. • City-wide Bridge Program (federally funded), City of Concord, CA - $1M Assistant resident engineer/ construction and structures inspector for the construction of maintenance repairs for six bridges throughout the City that include: Willow Pass Road Over Mount Diablo Creek, Kirker Pass Road Over Mount Diablo Creek, Diamond Blvd Over Walnut Creek - Left, Diamond Blvd Over Walnut Creek - Right, Cowell Road Over Galindo Creek, and Walnut Ave Over Contra Costa Canal. The work included removal and replacement of deteriorating concrete, methacrylate deck surface treatment, drill and bond dowels and replacing concrete sections of abutment and bent caps, replacing barrier rails and replacing sections of deck concrete. • El Monte Road Preservation Project (federally funded), Town of Los Altos Hills, CA - $500K Assistant resident engineer/construction inspector for this federally funded project that removes, replaces and adds concrete curb ramps, and installs portions of new curb and gutter. Other work includes two inches of grinding and overlay of the existing roadway with new hot mix asphalt.
Traffic detector loops and existing striping is being replaced and various utility covers and frames will be adjusted to the finished grade of the new pavement. Work requires closely monitored, daily traffic control as all the improvement work takes place through the busy area of the I-280 and El Monte Road interchange and adjacent to Foothill College and also requires coordination with Caltrans for ramp closures.
• Mission Blvd Widening - Caltrans, District 04, Niles/Fremont, CA - $42M Project manager for this $42 million project that widened and improved Mission Blvd, State Route 238, in Fremont and Niles. Project work included widening of three existing bridges over the railroad and also over Alameda Creek. Other work included utility relocations & installations, drainage improvements, new and replacement traffic signals and street lighting and curb, gutter & sidewalk construction.
• Southbound I-280 Wolfe Road Ramp Widening - Caltrans, District 4, Cupertino, CA - $1.2M Project manager and construction engineer for this $1.2 million project that widened the existing ramp, relocated existing utilities, replaced the existing traffic signal at Wolfe Road and curb, gutter and sidewalk. Project required multiple stages of construction with related traffic control. • SR-87 Widening - Caltrans, District 04, San Jose, CA - $24M Project manager and construction engineer for this $24 million project that widened SR-87 from I- 880 to Taylor Street in San Jose. Work included construction of MSE walls, a new Separation Structure over 1-880, use of AC and open-graded AC, drainage facility installation and improvements, highway lighting and signal installation and relocation of conflicting utilities. • I-205 Widening - Caltrans, District 10, Tracy, CA - $8M This $8 million project widened both directions of I-205 from 11 Street to the I-580 Interchange, through Tracy, a critically congested stretch of highway. Project work included widening of five existing bridges, construction of new sound walls and retaining walls, roadway section construction including HMA paving, drainage and electrical improvements. 1-880 Interchange / North Fremont-Alvarado Blvd - Caltrans, District 04, Fremont, CA - $13M This $13 million project updated the existing interchange and widened a portion of 1-880 lanes between Union City and Fremont. Project work included demolition of existing and construction PARK
RESUME
of the new overcrossing structure, construction of various sound and retaining walls, new drainage, highway lighting and traffic signal facilities, utility relocations, irrigation and planting. • Stanford University, University Property, Roadway and Drainage Improvements Stanford, CA This project constructed new drainage facilities, relocated / improved existing utilities, installed new landscaping and related concrete and natural features around the Blackwelder and Quillen high rise structures.
• El Camino Real Street Improvements, Samtrans Transit District, Burlingame to Belmont, CA - $4M
The $4 million project constructed 15 new bus pads for various stops along El Camino Real. Scope also included grinding out existing failed pavement sections and paving back with Hot Mix Asphalt at various locations along El Camino Real with extensive traffic control. • Santa Clara Valley Transportation Authority (VTA), Great Mall/Main Light Rail Station, Santa Clara, CA - $8M
Construction Engineer for this $8 million project that constructed a new passenger station and maintenance building. Other work included drainage facilities, utility relocation & new facilities, hardscape features that included shelters, benches and receptacles and landscaping improvements.
• SR 92 Widening - Caltrans, District 04, Half Moon Bay, CA - $11M This $11 million project widened and improved Highway 92 from near Skyline Blvd to Half Moon ay. Project work included widening of the existing roadway by performing mass excavation o illsides, construction of soldier pile walls and soil nail walls. Other work included roadwa section work, drainage and electrical improvements, utility relocations and extensive detail to storm water pollution prevention for nearby creeks. Project initiated numerous design changes to meet existing field conditions and stay with allocated project funds. • Sunol Water Treatment Plant, Sunol, CA
Construct road around the plant. Pave 2 small parking areas with curb and gutter. $400 k • Oroyson Village - Bryant Terrace, Fremont, CA
Building pads and site work for apartment complex. $900 k • Brackish Water Desalination Plant, Newark, CA
Construct new access road and site work. $ 2 million.
• 1-280 Median Barrier - Guadalupe Pkwy to 101, San Jose, CA Install asphalt pavement in preparation for new concrete median Barrier. $750 k • Nortel Networks Office Development, Santa Clara, CA
Offsite street improvements and move utilities. New parking lot and site work circling building Great America Pkwy. $500 k
• Pico Power Plant, Santa Clara, CA
Subgrade, base rock and asphalt around concrete pads. $700 k Tak Fudenna Stadium, Fremont, CA
Built by Fremont Unified School District, Tak Fudenna Stadium features an all-weather football field and track, bleachers for 5,000 spectators, ADA accessible press box, concession stands, restrooms, field lighting, sound system, and a team locker-shower facility. Chris managed the installation of new track and synthetic turf field, including storm drains. $4.8 million.
San Jose School District - 3 High Schools, San Jose, CA Install new tracks, lighting, synthetic turf fields and bleachers. $12.9 mil • De Anza College Athletic Field, Cupertino, CA
PARK
NO NEERIA
RESUME
Chris managed the reconstruction of the school athletic field and track, including installation of new tennis courts, synthetic turf field, and parking lot. Work included grading, sub-drainage systems, minor concrete, fencing, and AC paving. $5 million. • 1-880 HOV Lane Striping and Signage, Fremont, CA
Placed striping and signs for the I-880 HOV lane construction totaling $550,000. • Dyer Triangle, Union City, CA
Site work related to construction of the new Dyer Street Triangle Shopping Center, which included widening of main perimeter roads and surrounding streets. Work encompassed, utility relocation, sidewalks, curb & gutter, and landscaping. $3 million.
• Ohlone College, San Jose, CA
Project Engineer for construction of site improvements, which included a new ring road and parking lots with utilities, curb& gutter, sidewalks, drainage, lighting, and landscaping. $9 million. • Stevenson Blvd Widening Improvements, Fremont, CA
Project Manager for construction of street improvements from Eureka Drive to Mowry Rd, including sidewalk, curb & gutter, and landscaping. $1.1 million. • Grimmer Bld Reconstruction, Fremont, CA
Project included roadway widening and installation of media with irrigation and landscaping. $2 million.
• Bayfair Mall Parking Lot, San Leandro, CA
Removal of failing asphalt and placement of paving and seal coating. $1.3 million. • Nummi Paint Shop, Milpitas, CA
Excavate basement for paint shop. $800 k
PARK
ENGINEERINg
City of Pleasant Hill
PARK Annual Paving Project 2022
ENGINEERING
Rates Hours
Name/Classification Total
Regular Overtime Regular
Loaded Rate Rate Pre-Con Construction Post-Con Hours
Dante Morage/ Chris Kinser
Sr. Construction Inspector $ 159.55 239.33 0 240 0 240
1. Rate includes vehicle, mobile phone, laptop and all equipment required to perform required duties.
2. Based on 10 days of potholes, wedge grind and overlay, 10 days for the FDR portion of the work, 10 days for miscellaneous proje