EV Charging Checklist

Pleasant Hill City Council
December 19, 2022

Document
EV Charging Checklist
Meeting
December 19, 2022
Body
Pleasant Hill City Council
Original file
646 KB
Text extracted from the city's file for reading and search. Open the original on pleasanthillca.iqm2.com. That file is the official record.

This checklist is provided to determine if your application is eligible for expedited EVCS processing.

If any item is checked NO, revise design, otherwise application must go through standard review process.

Type of Charging Station(s) Proposed
Power Levels (proposed circuit rating)
Check one
Power Levels (proposed circuit rating) Check one
Level 1 110/120 volt alternating current (VAC) at 15 or 20 Amps Level 2 – 3.3 kilowatt (kW) (low) 208/240 VAC at 20 or 30 Amps Level 2 – 6.6kW (medium) 208/240 VAC at 40 Amps
Level 2 – 9.6kW (high) 208/240 VAC at 50 Amps
Level 2 – 19.2kW (highest) 208/240 VAC at 100 Amps
Other (provide detail): Provide rating:

PERMIT APPLICATION Yes No
A. Is the application complete with the following information: Project address, parcel #, builder/owner name, contractor name, valid contractor’slicense #, phone numbers, etc.? B. Does the application include EVCS manufacturer's specs and installation guidelines? ELECTRIC LOAD CALCULATION WORKSHEET Yes No
A. Is an electrical load calculation worksheet included? (CEC 220) B. Based on the load calculation worksheet, is a new electrical service panel upgrade required? 1) If yes, do plans include the electrical service panel upgrade? C. Is the charging circuit appropriately sized for a continuousload? (125%) D. If charging equipment proposed is a Level 2 – 9.6 kW station with a circuit rating of 50 Amps or higher, is a completed circuit card with electrical calculations included with the single line diagram? SITE PLAN & SINGLE LINE DRAWING Yes No
A. Is a site plan and electrical plan with a single‐line diagram included with the permit application? 1) If mechanical ventilation requirements are triggered for indoor venting requirements (CEC 625.15 (C)), is a mechanical plan included with the permit application? B. Is the site plan fully dimensioned and drawn to scale? 1) Showing location, size, and use of all structures
2) Showing location of electrical panel to charging system 3) Showing type of charging system and mounting
COMPLIANCE WITH 2019 CALIFORNIA ELECTRICAL CODE (TITLE 24, PART 3) Yes No A. Doesthe plan include EVCS manufacturer's specs and installation guidelines? B. Does the electrical plan identify the amperage and location of existing electrical service panel? 1) If yes, does the existing panel schedule show room for additional breakers? C. Is the charging unit rated more than 60 amps or more than 150V to ground? 1) If yes, are disconnecting means provided in a readily accessible location in line of site and within 50’ of EVCS? (CEC 625.43)
D. Does the charging equipment have a Nationally Recognized Testing Laboratory (NRTL) approved listing mark? (UL 2202/UL 2200)
E. If trenching is required, is the trenching detail called out? 1) Is the trenching in compliance with electrical feeder requirements from structure to structure? (CEC 225)
2) Is the trenching in compliance of minimum cover requirements for wiring methods or circuits? (18” for direct burial per CEC 300)

RESIDENTIAL
Eligibility Checklist for Expedited EVCS