Proposal for Civil Engineering Services
Project Name: Contra Costa Blvd Corridor Improvements from Harriet Dr to Viking Drive Date: 10/26/2023
Client: City of Pleasant Hill
Contract: 530020002
Project 210032
To: Deirdre Castillo, PE
Project Manager,
City of Pleasant Hill
Consultant. Bellecci & Associates, Inc., and their sub-consultants, will perform additional tasks that are needed to revise the project plans and specifications to reduce construction costs. The additional scope of services can be divided into five main tasks, as follows:
Item 1: Engineering Design Revisions
• Revise photometric analysis to reflect removal of pedestrian lighting. • Recalculate electrical requirements and revise design of service cabinet to reflect removal of pedestrian lighting. • Review street grades at new concrete curbs in order to reduce the amount of asphalt conform. • Recalculate irrigation system requirements.
• The cost for Engineering Design Revisions is included in the cost of Basic Services (see Exhibit A) for $86,762.53.
Item 2: Modify Project Plans and Specifications
• Remove all pedestrian lighting and associated conduits, conductors, and junction boxes. • Revise photometric sheets.
• Revise project bid form and specifications to reflect the inclusion of “City-furnished” and Contractor-furnished” traffic signal equipment and median street lights.
• Remove base failure repairs, mill and fill paving, micro-surfacing, and associated utility adjustments. • Decrease the amount of asphalt conform and associated utility adjustments. • Remove concrete bulb-out and associated drainage structures at the southeast corner of Contra Costa Blvd. and Sun Valley Blvd. Add “quick-build” materials such as striping and channelizers or rubber curb instead of concrete to define the build-out.
• Delete storm drainpipe and associated drainage structures crossing Taylor Blvd. between flow-through planters. • On the west side of Contra Costa Blvd. between Viking Dr. and Taylor Blvd., remove sidewalk, curb, and gutter improvements, and associated utility adjustments. Replacement of ADA-deficient driveways, curb ramps, and sidewalk trip hazards, and associated utility adjustments, will remain in the scope of work. • Reduce irrigation system and landscape by 35%. Change tree size from 36” box to 24” box. Reduce landscape and irrigation maintenance period.
• Change cobblestone paving to pavers.
• Change Storm Water Pollution Prevention Plan (SWPPP) development, monitoring, and inspection, from “Contractor-provided” to “City-provided.”
• The cost for Modify Project Plans and Specifications is included in the cost of Basic Services for $86,762.53.
Contract Additional Service
Item 3: Additional Utility Coordination
• Update PG&E application to reflect removal of pedestrian lighting. • Provide updated Utility Plans to affected companies. Revise requests for utility adjustments. • The cost for Additional Utility Coordination is included in the cost of Basic Services for $86,762.53.
Item 4: Pothole for Traffic Signal Poles
• Potholing is needed to verify the size and placement of traffic signal poles. • The cost for these services is estimated to be $34,033.12.
Item 5: Extended Construction Support Services (Optional) • Design support during construction may be needed if, for example, unforeseen conditions necessitate a redesign. The original agreement with the Consultant included these services, but additional work associated with the project modifications, meetings with the CCTA, and completion of an arborist report have expended that budget. • The cost for these optional services is estimated to be $27,835.96.
Please feel free email me at [email protected] or call me with any questions or comments at 925.685.4569 Sincerely,
Anoop Reddy Admal, PE QSD
PE License #C76008
Exhibit B
COST PROPOSAL
Mark Ups ODCs Total
Project
Manager Principal Sr. Civil Engineer
Prof.
Enigneer I
Design
Engineer
Assoc.
Engineer Traffic Enigneer Landscape Architect
Irrigation
Consultant
Potholing/Wo
odreeve
Consulting
AA DL ET Fehr & Peers RHAA RMA Exaro
$232.13 $253.98 $232.13 $141.79 $102.41 $99.68 LS Fee LS Fee LS Fee LS Fee 1 1.1 Revsied Bid PS&E 24 4 16 40 32 116 $16,141.84 $10,485 $5,905 $2,573 $1,896.25 $37,000.59
1.2 PG&E Application 4 $3,980 $398.00 $4,378.00
2 2.1 Bid Support 12 24 36 $5,243.40 $2,000 $800 $280 $8,323.40 3 3.1 Project management 12 12 $2,785.56 $0 $2,785.56
3.2 Attend Pre-Construction meeting 2 2 $464.26 $0 $464.26
3.3 Two (2) Site visits 2 2 4 $669.08 $0 $30 $699.08
3.4 Four (4) MS teams conference calls (Assume 0.50 hrs each) 2 0.5 2 4.5 $796.07 $0 $796.07 4 RFI Review
4.1 Review and Respond to Minor RFI's 8 0.5 48 40 97 $10,886.91 $3,300 $2,500 $580 $17,266.91
4.2 Review and Respond to RFI's with Plan Revisions 8 1 40 32 81 $9,397.18 $0 $9,397.18 5 Submittal Reviews
5.1 Review Submittals 8 32 40 80 $9,121.36 $9,750 $4,500 $1,425 $24,796.36
5.2 Review Re-submittals 4 12 8 24 $2,954.88 $0 $2,954.88 6 6.1 Punch walk + Review final redlined mark ups and prepare asbuilts 8 24 32 $4,314.88 $0 $30 $4,344.88 7 $0
7.1 Punch walk + Review final redlined mark ups and prepare asbuilts 4 8 8 $2,545.24 $1,109 $1,000 $211 $30 $4,895.14
7.2 Final Irrigation and Planting System Checkout $0.00 $3,950 $395 $30 $4,375.00 8 $0 $0.00
9 8.1 Review Staking Calculations (Assume 3 CAD submittals) 8 36 24 68 $7,936.12 $7,936.12
66.0 2.0 0 0 204 152 404 $73,256.78 $30,624.0 $14,705.0 $6,522.5 $0.0 $5,185.15 $120.0 $130,413.43 $43,650.9
$86,762.53
10 32 4 40 60 76 212 $27,835.96 $0 $27,835.96
11 12 12 $1,228.92 $29,822 $2,982 $34,033.12
a Distribution of Hours may vary during the performance of the work Extended Construction Support Services
Potholing Investigations
Optional Services
Task
# Task Description
City of Pleasant Hill 20-Oct-23
Proposal for: Bid Documents and Construction Support Services for Contra Costa Blvd Improvements Tasks Labor
Total
Hours
Total Labor
Costs
10% Sub
Mark Up
Other Direct
Costs
project Closeout
Amount Remaining In Contract
Amount Requested
Staking Review
Total Fee
Construction Support
Record Drawings
Basic Service Subtotal
PS&E - Bid Docs
Bid Suport
Arborist Report
1/1
~ Delivering Excellence with a Sense of Urgency ~ ™
Utility Locating by Electronic Detection, GPR & Vacuum Excavation, Concrete Rebar Scanning, Cathodic Protection PUC Regional LBE #HRC120915006 SBE #42413 MBE #5LN00013 License CA 860376 Class A, C10, C31, Haz Union DIR Registration #1000005280
September 11, 2023
Anoop Reddy Admal [Tel] 925-685-4569
Bellecci
2290 Diamond Boulevard, Suite 100
Concord, CA 94520
RE: R1 - EXARO is pleased to provide this proposal for Vacuum Excavation (potholing) on the Contra Costa Blvd/Taylor Blvd. Intersection Traffic Signal Project in the City of Pleasant Hill, CA.
Scope**
1. Mark out boundaries, notify USA and coordinate with utilities
2. Prepare Traffic Control Drawings 'Standard' (none engineer stamped)
3. Obtain Permits (excludes permit fees and bonds) unless otherwise notified
4. Implement Traffic Control – lane closure & shoulder work
5. Vacuum excavate 20 potholes (standard 1’x1’) to confirm underground utilities per furnished drawings
6. Backfill with class II in pavement and native material in dirt
7. Repair asphalt with hot mix asphalt paving (6” T-cut)
8. Repair concrete sidewalk with ready-mix concrete plug (in pothole size only)
9. Provide vertical and horizontal location of utilities referenced to existing infrastructure Proposal Fee **Fee is binding to assumptions regardless of omission on contract (Bonds, Permits, Deposits billed at cost +15%) $ 29,822
Add $14,234 if potholes are clear 8’ deep
Assumptions
1. General Conditions pg. 2 apply unless noted otherwise on this page
2. RETENTION – RETENTION shall not exceed 12 months. Any invoice retention exceeding 12 months will be revised for 3.5% inflation
3. Demolition - Concrete curb, gutters or sidewalk ramps will not be demolished for pothole
4. Depth - Potholes will be cleared up to 5’
5. Restoration - City will allow ready-mix concrete plug in pothole size, should City inspector require another method, additional fees will apply
Schedule - Project is estimated to take 5 working days. This proposal is valid for 90 days.
Payment - Terms for payment are 5 days net or per noted on Contract Terms.
Thank you for the opportunity to provide this proposal Ms. Reddy Admal. Please call me if you have any questions.
Kindest Regards,
Arthur Servin Signature
Arthur Servin Print Name
Estimator Title
EXARO Technologies Corporation Bellecci
www.exarotec.com Date
EXARO TECHNOLOGIES CORPORATION
1831, Bayshore HWY, Burlingame.CA. 94010
Tel: (650)-777-4324
General Engineering Contractor
~ Delivering Excellence with a Sense of Urgency ~ ™
Utility Locating by Electronic Detection, GPR & Vacuum Excavation, Concrete Rebar Scanning, Cathodic Protection PUC Regional LBE #HRC120915006 SBE #42413 MBE #5LN00013 License CA 860376 Class A, C10, C31, Haz Union DIR Registration #1000005280 Attachment G – General Conditions apply unless specified otherwise
1.0 Client is to provide: (client refers to authorizing signature and agency and or owner it represents)
1.1 All necessary permits required to complete this project at no cost to EXARO unless specified otherwise
1.2 Any special conditions and or work restrictions on project and or project area
1.3 Cancellations less than 24 hours prior to scheduled start of work will be billed at $800.00
1.4 Coordinate access to restricted areas when necessary
1.5 Escalation – All costs are firm until end of June 2024. Any work done beyond the said date is subject to cost escalation.
1.6 Name and address where to submit invoicing
1.7 Payment 60 days net or within 10 days of receipt of payment.
1.8 Preliminary Lien information including owner name and address
1.9 Retention – Any retention shall not exceed 90 days after EXARO’s portion of work is complete and invoiced.
Retention exceeding 90 days from last invoice will be re-invoiced at retention plus 10%.
1.10 Hazardous Substances/soils - all known hazards within the project area
1.11 One hard copy sets of full-size scaled drawings
1.12 USA – If EXARO’s scope excludes performing USA then:
1.12.1 PRIME is to provide EXARO a copy of USA ticket for all the work locations.
1.12.2 EXARO assumes no responsibility or liability for any damage to unknown underground utilities. PRIME to pothole any utilities within the excavation area and provide pothole data to EXARO
2.0 EXARO Technologies Corporation is to provide
2.1 Backfill with native material compacted to 95% or greater
2.2 Bagged patch paving (unless otherwise specified) warranted for 1 yr, hot mix for 2 yrs
2.3 Highly skilled foreman and technicians as needed to deliver excellence
2.4 Traffic control consisting of construction signs and delineation (if included). Unique local agency requirements requiring additional resources subject to additional fees
2.5 Vacuum excavation truck and other standard equipment required to perform work
3.0 Exclusions/Other [* Can be provided for an additional fee]
3.1 *As built drawings not included
3.2 *Bonds, Permits, Deposits, Railroad Flagman are pass through costs billed at 15% of amount rendered
3.3 *Dewatering/Hazardous material encountered not included in above fees.
3.4 *Paint removal, Striping restoration & Survey of results not included
3.5 Insurance or other in excess of Auto 1M, GL 4M, Poll 1M, Prof 1M, WC 1M billed at cost +15%
3.6 Potholing price based on normal moderate soil conditions. Where pavement thickness exceeds 6” and or extreme soil conditions such as hard pan, dense clay, rocky and or water table exists additional fees will be applied due to increased time to vacuum excavate.
3.7 Schedule of work is subject to change due to inclement weather
3.8 Stand-by time, or delays caused by others will be billed at prorated 8-hour day.
3.9 Training or requested meetings not specifically identified in proposal will be additional fees
3.10 Work hours – proposal based on normal business hours between 7AM and 5 PM portal to portal. Any workdays cut short of an 8 hour working window will be billed as standby time for non-productive time.
3.11 Proposal based on pothole depths not to exceed 5 feet unless specified otherwise and will excavated over the USA markings, should the utility not be found over existing marks, any additional potholes required will be considered extra work. Excess footage will be billed accordingly.
Four red dots
PH 1-4at Future Signal polenext to ex. CurbRamp in Sidewalk One red dotPH 5at Future Signal pole in Asphalt ConcreteAvoid the loops hereduring potholeoperations Two red dotsPH 6-7at Future Signal pole in Sidewalk
One red dotPH 8at Future Signal pole
Four red dots in SidewalkPH 9-12at Future Signal pole in Sidewalk One red dotPH 13at Future Signal pole in Asphalt pavement One red dotPH 14at Future Signal pole in Asphalt pavement Two red dotsPH 15-16at Future Signal pole in landscape area One red dotPH 17at Future Signal pole in C&G
One red dotPH 18at Future Signal pole in Curb Ramp flare One red dotPH 19at Future Signal pole in landscape areas One red dotPH 20at Future Signal pole in landscapeareas/back of walk 100 Pringle Avenue | Suite 600 | Walnut Creek, CA 94596 | (925) 930-7100 | Fax (925) 933-7090 www.fehrandpeers.com
September 5, 2023
Dan Leary, PE
Bellecci & Associates
2290 Diamond Boulevard, Suite 100
Concord, CA 94520
Subject: Contra Costa Boulevard Improvements - Additional Traffic Engineering Services
Dear Mr. Leary,
Thank you for your collaboration thus far as we provide transportation engineering services to support the Contra Costa Boulevard Improvements project. Based on discussions with the City of Pleasant Hill, items in the original Contra Costa Boulevard improvements are being removed. Fehr & Peers presents the following proposal to provide additional design services. This amendment is for an additional round of revisions to the PS&E, PG&E coordination, and bid support.
The following presents our proposed additional scope and fee for this work.
SCOPE OF WORK
Task 1 – PS&E Updates
Fehr & Peers will update the PS&E to incorporate the removal of pedestrian scale lighting along Contra Costa Boulevard and the bulb out on the southeast corner of Contra Costa Boulevard/Taylor Boulevard in which minor striping changes will be required. This task assumes one submittal with no rounds of review or comments from the City.
Plans and cost estimates for the construction work will be updated using applicable Caltrans Standard Plans and Specifications and plans and specifications provided by the City of Pleasant Hill.
Task 2 – PG&E Coordination
We assume the new traffic signal at Contra Costa Boulevard/Alan Drive will require new service from PG&E. Fehr & Peers will provide PG&E coordination and support for the new service. We will Dan Leary
September 5, 2023
complete the service application and submit it to PG&E on behalf of the City. Any connection or application fees shall be paid for by the client. These fees are not included in this scope and fee.
Fehr & Peers will attend up to one virtual meeting in support of the PG&E coordination and one field meeting.
Task 3 – Bid Support
Fehr & Peers will provide additional assistance during project bidding. This includes attendance of a pre-bidding meeting and answering requests for information (RFI) from the contractors during the bid period. We budgeted up to 12 staff hours for this task.
COST ESTIMATE AND SCHEDULE
Any services not specifically listed in the above tasks one through three will be considered additional work for which a separate scope, fee and schedule will be prepared. It is anticipated that no systems, other than those listed above, will be modified, or added as part of this project.
Fehr & Peers will perform this work on a time-and-materials basis not to exceed $17,715. This work will be completed under our original terms and conditions agreement dated August 5, 2021. If the scope, fee, and schedule are acceptable, please provide an updated task order. Please contact Mark Howard at (925) 930-7100 with any questions or if you need any additional information. We look forward to working with you on this project.
Sincerely,
FEHR & PEERS
Rob Rees, PE (C49620)
Principal
Mark Howard, PE
Senior Transportation Engineer
P21-5549-WC
Attachment: Fee Proposal
Fehr & Peers (Subconsultant)
Principal-inChargeProject
Manager Engineer
CAD
Tech/
Graphics
Project
Coordinator
Labor
Hours
Total Cost
Tasks $370 $220 $165 $185 $155
PS&E Updates and Additional Traffic Engineering Services Task 1 - PS&E Updates 2 6 40 4 7 59 $10,485
Task 2 - PG&E Coordination 1 6 12 2 21 $3,980
Task 3 - Bid Support 2 10 2 14 $3,250
Total for all Tasks 5 22 52 4 11 94 $17,715
Notes:
Actual billing rate at the time of service may vary depending on the final staffing plan at the time the project starts; the over Mileage is billed at the IRS rate plus 10% handling fee All other direct and subconsultant expenses are billed with 10% handling fee Other direct costs such as computer, communications, and reproduction charges are billed as a percentage of labor Rates and staff are subject to change at any time, without notice, and within the total budget shown Fee Proposal for Contra Costa Boulevard Improvement Project 1 SCOPE
1 2 Cost estimate update
3 Bid support
FEE SUMMARY
Task 1 Bid Set CD Update and Bid Support $6,705
$6,705
Sub-consultant (RMA Irrigation)
Task 1 Bid Set CD Update and Bid Support $2,450
$2,450
$123
$9,278
Assumptions
1 2
3 4
5 Client to provide accurate CAD base map.
6 7
1 2
3 4
5 6
Significant changes beyond the discussed Bid Set revisions will be considered extra services.
Subtotal RHAA Labor
Bellecci & Associates
Contra Costa Boulevard Improvements
ASR#2 -ALTERNATIVE 1
The scope of work is limited to the tasks and consultants listed.
Meetings not listed above will be billed as time and materials.
Submittals consist of one electronic set.
Fees are based on project schedule as shown. Project delays will be considered extra services.
Additional submittals will be billed as time and materials.
Subtotal RMA Labor
Construction drawing updates to include: North of Alan Drive, eliminate planting and irrigation behind the curb; South of Taylor and proposed bulbout, elimintae planting and irrigation behind the curb; in the northernmost median island, remove all understory planting and irrigation, trees to remain. Revise plant spacing to result in a 25% quantity reduction; replace cobble paving with pavers; revise Tree Removal & Protection Plan and table to reflect new conditions. Reduce tree size from 36" to 24" box trees. 5% Sub-consultant mark-up
Total Proposed ASR#2 - Alt 1 Fee
Engineering services.
Water feature.
Arborist.
Site lighting design.
Exclusions
Computer models and photo rendering.
Waterproofing.
1 of 1