RESOLUTION NO. _________-24
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PLEASANT HILL
AUTHORIZING THE CITY MANAGER TO EXECUTE A DESIGN PROFESSIONAL
SERVICES AGREEMENT WITH NCE FOR DESIGN ENGINEERING SERVICES FOR THE
TAYLOR BOULEVARD SIDEWALK GAP CLOSURE PROJECT
WHEREAS, in November 2016, Pleasant Hill voters approved Local Measure K, a twentyyear, one-half cent transaction and use tax to address the infrastructure needs of the City; and WHEREAS, the Fiscal Year (FY) 2024-2029 Capital Improvement Plan included the previously identified Taylor Boulevard Sidewalk Gap Closure Project; and WHEREAS, the Taylor Boulevard Sidewalk Gap Closure Project includes areas considered to be high priority locations for pedestrian and bicycle improvements based on proximity to schools, number of nearby destinations, and traffic volume and speed; and WHEREAS, the City wishes to construct a new ADA-compliant pathway along Taylor Boulevard within the proposed limits; and
WHEREAS, the City desires to utilize the professional services of NCE for design engineering and preparation of plans and specifications for the Taylor Boulevard Sidewalk Gap Closure Project; and
WHEREAS, NCE has submitted a proposal to the Engineering Division, which is complete and acceptable.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Pleasant Hill:
1. Authorizes the City Manager to execute a Design Professional Services Agreement in a form approved by the City Attorney with NCE for design engineering services for the Taylor Boulevard Sidewalk Gap Closure Project in an amount not to exceed $102,900.
2. Authorizes the transfer of $17,900 from the City’s Measure K Pedestrian and Bike Program for FY 2024/2025 to the Taylor Boulevard Sidewalk Gap Closure Project.
ADOPTED by the City Council of the City of Pleasant Hill at a regular meeting of the Council held on the 21st day of October, 2024, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
MATTHEW RINN, Mayor
ATTEST:
___
LYONE CONNER, City Clerk