November 2022 TDA Article 3 Model Resolution Page 5
Resolution No. ____-25 page ___ of ___
Attachment B
TDA Article 3 Project Application Form

1. Agency City of Pleasant Hill

2. Primary Contact Laetitia Galeazzi, PE, Senior Civil Engineer

3. Mailing Address 100 Gregory Lane, Pleasant Hill, CA 94523

4. Email Address [email protected] 5. Phone Number 925-671-5252

6. Secondary Contact (in
the event primary is
not available)
Anthony Nuti, PE, Associate Engineer

7. Mailing address (if
different) N/A☒

8. Email Address [email protected] 9. Phone Number 925-671-5203

10. Send allocation
instructions to (if
different from above):

11. Project Title Taylor Boulevard Sidewalk Installation Project

12. Amount requested $250,000 13. Fiscal Year of
Claim
2026/2027

14. Description of Overall Project:

For the 2022/2023 fiscal year, the City of Pleasant Hill applied and won TDA funding to construct 900 feet of ADAcompliant pathway of travel along Taylor Boulevard between Civic Drive and Ruth Drive. The proposed Taylor Bouelvard Sidewalk Installation Project (Project) will close the final gap along Taylor Boulevard and replace approximately 850 feet of existing non-compliant asphalt path located on the south side of Taylor Boulevard between Lucille Lane/Norse Drive and Civic Drive with a new 6’ concrete sidewalk. This project will also upgrade the existing non-compliant ADA curb ramps at the southeast corner of the intersection of Taylor Boulevard and Lucille Lane/Norse Drive and at the southwest corner of the intersection of Taylor Boulevard and Civic Drive, rehabilitate the existing east crosswalk at the intersection of Taylor Boulevard and Lucille Lane/Norse Drive, and rehabilitate the striping and markings of the eastbound bike lane along Taylor Boulevard. See attached plan set for more details on the extent of this Project.

This improvement will connect residents to the various schools in the area (e.g. Gregory Gardens Elementary School, Valley View Middle School, College Park High School, and Diablo Valley College), the YMCA, Police Department, Community Center, and various businesses. Taylor Boulevard is a busy principal arterial in the City of Pleasant Hill with a traffic volume of 16,000 vehicles per day. Residents and pedestrians are reluctant to utilize Taylor Boulevard as a safe path of travel due to motorized traffic. The proposed sidewalk is needed to provide students, residents, and bicyclists a safe means of access. The proposed project will encourage walking/biking to school and other civic destinations from the surrounding neighborhoods.

November 2022 TDA Article 3 Model Resolution Page 6

15. Project Scope Proposed for Funding: (Project level environmental, preliminary planning, and ROW are ineligible uses of TDA funds.)

16. Project Location: A map of the project location is attached or a link to a online map of the project location is provided below:

Project Relation to Regional Policies (for information only)

17. Is the project in an Equity Priority Community? Yes☐ No☒

18. Is this project in a Priority Development Area or a Transit-Oriented Community? Yes☐ No☒

19. Project Budget and Schedule
Project Eligibility
A. Has the project been reviewed by the Bicycle and Pedestrian Advisory Committee? Yes☐ No☒ If “YES,” identify the date and provide a copy or link to the agenda.

If "NO," provide an explanation). Explanation: Submitting for Review B. Has the project been approved by the claimant's governing body? Yes☒ No☐ If "NO," provide expected date:__________________
C. Has this project previously received TDA Article 3 funding? Yes☐ No☒ (If "YES," provide an explanation on a separate page)
D. For "bikeways," does the project meet Caltrans minimum safety design criteria Yes☒ No☐ pursuant to Chapter 1000 of the California Highway Design Manual? E. 1. Is the project categorically exempt from CEQA, pursuant to CCR Section 15301(c), Yes☒ No☐ Existing Facility?

2. If “NO” above, is the project is exempt from CEQA for another reason? Yes☐ No☐ Cite the basis for the exemption. __________________________ N/A☒ If the project is not exempt, please check “NO,” and provide environmental documentation, as appropriate.

F. Estimated Completion Date of project (month and year): ___July 2027_____ The proposed TDA funds will be applied towards construction of the improvements as listed on the attached detailed estimate.

Project location map attached.

Project Phase TDA 3 Other Funds Total Cost Estimated Completion (month/year)
Bike/Ped Plan
ENV
PA&ED
PS&E
ROW
CON $ 250,000.00 $ 161,996.00 $ 411,996.00 July 2027
Total Cost $ 250,000.00 $ 161,996.00 $ 411,996.00
November 2022 TDA Article 3 Model Resolution Page 7
G. Have provisions been made by the claimant to maintain the project or facility, or has Yes☒ No☐ the claimant arranged for such maintenance by another agency? (If an agency other than the Claimant is to maintain the facility, please identify below and provide the agreement.

H. Is a Complete Streets Checklist required for this project? Yes☐ No☒ If the amount requested is over $250,000 or if the total project phase or construction phase is over $250,000, a Complete Streets checklist is likely required. Please attach the Complete Streets checklist or record of review, as applicable. More information and the form may be found here: https://mtc.ca.gov/planning/transportation/complete-streets