Text extracted from the city's file for reading and search. Open the original on pub-pleasanthillca.escribemeetings.com. That file is the official record.

BOYD RD

CRESCENT PLAZA CONTRA COSTA BLVD
8'
11'
11'
11' 11' 11' 11'
11'
11'
Contra Costa Blvd
between Monument Blvd & Boyd Rd
Figure 1
CONCEPTUAL - NOT FOR CONSTRUCTION. ADDITIONAL
DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED.

CONTRA COSTA BLVD

CONCEPT PLAN
1:80
LEGEND

CURB LINE

SHARED USE PATH

CURB EXTENSION

BICYCLE CONFLICT

ZONE MARKING

PROPOSED RED CURB

EXISTING CURB TO REMOVE PROPOSED CURB RAMP

SEPARATED BIKE LANE PROPOSED BIKE RAMP

PROPOSED

RECTANGULAR RAPID

FLASHING BEACON (RRFB)

PROPOSED RAILING

PROPOSED

RETRACTABLE BOLLARD

BUS STOP
B
B

MODIFY SIGNAL TO SEPARATE

NORTHBOUND RIGHT TURNS

FROM PEDESTRIANS AND

CYCLISTS IN EAST AND SOUTH
CROSSWALKS.

MODIFY SIGNAL TO SEPARATE

SOUTHBOUND RIGHT TURNS FROM

PEDESTRIANS AND CYCLISTS IN
WEST AND NORTH CROSSWALKS.

PROHIBIT EASTBOUND RIGHT
TURN ON RED.

PROPOSED SHARED-USE

PATH ON MONUMENT
BOULEVARD.

MAINTAIN EXISTING
BUS STOP LOCATION.

INSTALL MARKED
CROSSWALK.

WIDEN SIDEWALK.

WIDEN SIDEWALK.

REDESIGN DRIVEWAY TO

PROVIDE RAISED SEPARATED
BIKE LANE AND CROSSWALK.

MONUMENT BLVD
Updated County Connections Request (May 2026):

Project will review the need to provide a 12' lane for
the right most lane to accommodate buses along the
Monument Blvd corridor during design phase.

W HOOKSTON RD CONTRA COSTA BLVD

EBMUD TRAIL

EXISTING EBMUD TRAIL
11' 11' 11'
10' 11' 11'
12'
Contra Costa Blvd
between Boyd Rd & W Hookston Rd
Figure 2
1:80
CONCEPTUAL - NOT FOR CONSTRUCTION. ADDITIONAL
DETAILED ANALYSIS AND ENGINEERING DESIGN REQUIRED.

CONTRA COSTA BLVD

CONCEPT PLAN
LEGEND

CURB LINE

SHARED USE PATH

CURB EXTENSION

BICYCLE CONFLICT

ZONE MARKING

PROPOSED RED CURB

EXISTING CURB TO REMOVE PROPOSED CURB RAMP

SEPARATED BIKE LANE PROPOSED BIKE RAMP

PROPOSED

RECTANGULAR RAPID

FLASHING BEACON (RRFB)

PROPOSED RAILING

PROPOSED

RETRACTABLE BOLLARD
B

BUS STOP

MAINTAIN EXISTING BUS STOP

LOCATION ON BUS BOARDING

ISLAND WITH RAILINGS AND
MARKED CROSSWALK.

PAINT RED CURB TO
ACCOMMODATE 90' BUS
PULL-IN ZONE.

INSTALL RAISED, HIGH

VISIBILITY CROSSWALK WITH

RECTANGULAR RAPID

FLASHING BEACONS (RRFBS)

FOR PEDESTRIAN CROSSING
SAFETY.

REPLACE EBMUD ACCESS GATE

WITH RETRACTABLE BOLLARD
WITH 8' OPENING ON EITHER

SIDE FOR SHARED-USE PATH
CONNECTION TO TRAIL.

REDESIGN DRIVEWAY TO

PROVIDE RAISED SEPARATED
BIKE LANE AND CROSSWALK.

MAINTAIN EXISTING
PARKING.

B

INSTALL DETECTABLE

WARNING SURFACE AT

ENTRANCE AND EXIT OF

WHERE SHARED USE PATH
MEETS SIDEWALK.

Updated County Connections Request (May
2026): The project will review and revise the
proposed bus pull-out to be an in-lane stop
during the design phase of the project.

Updated County Connections Request (May 2026):

Project will review the need to provide a 12' lane for
the right most lane to accommodate buses along the
Monument Blvd corridor during design phase.