MEMORANDUM

Date: September 16, 2025

To: Mayor and City Council
Planning Commissioners

From: Gerry Beaudin, City Manager
Ellen Clark, Community and Economic Development Director

Subject: East Pleasanton Policy Framework Joint Workshop

Following the publication of the agenda report and attachments, staff determined an incorrect version of Figure 9 of Attachment 1 (Livermore General Plan Land Use Designations) had been included. An updated, corrected version of Figure 9 is attached.

Additionally, the PowerPoint presentation has been updated to include slide numbers.

EAST PLEASANTON POLICY FRAMEWORK

BACKGROUND INFORMATION MATERIALS

BACKGROUND INFORMATION MAPS
The City has prepared new maps and assembled existing maps with information relevant to the EPPF project. All maps listed below are attached to this document.

Maps

1. Study Area Boundaries. Shows the EPPF study area boundary and the East Pleasanton Specific Plan boundary (not adopted). Map prepared for EPPF project.

2. Pleasanton Boundaries. Shows the City of Pleasanton City Limits, Sphere of Influence, and Urban Growth Boundary. Map prepared for EPPF project.

3. Livermore and County Boundaries. Shows the City of Livermore City Limits, Sphere of Influence, and Urban Growth Boundary; and the Alameda County Urban Growth Boundary.

Map prepared for EPPF project.

4. Existing Land Uses. Shows existing land uses and proposed development in the study area.

Map prepared for EPPF project.

5. Parcelization and Ownership. Shows major property owners in study area. Map prepared f
or EPPF project.

6. Pleasanton General Plan Land Use Designations. Shows the City of Pleasanton General Plan Land Use Designations as shown in the General Plan Land Use Map. Map prepared for EPPF project.
7 . Pleasanton Zoning. Shows Pleasanton Zoning. Map prepared for EPPF project.

8. Alameda County General Plan. Shows Alameda County Land Use Designations. Map prep
ared for EPPF project.

9. Livermore General Plan. Shows City of Livermore General Plan Land Use Designations. Map prep
ared for EPPF project.

10. Livermore SMP Site Plan. Site plans for the SMP 38/39/40 development project in Livermore. (Note, the SOI amendment for SMP-38 was contemplated in the environmental review document from which this figure is taken, but was since eliminated from the project proposal). Existing map
.
1 1. Future Use Discussion Sites. Shows six areas where the City may wish to consider future land use options as part of the EPPF project. Map prepared for EPPF project.

12. Chain of Lakes Configuration (Zone 7). Shows the future Chain of Lakes Configuration as identified by Zone 7 in 2020. Existing map.

ATTACHMENT 1

13. Chain of Lakes Potential Primary Uses (Zone 7). Summary map of potential primary uses for chain of lakes. Existing map.

14. Chain of Lakes Potential Secondary Uses (Zone 7). Summary map of potential secondary uses for chain of lakes.Existing map.

15. Future Trail System. From the Trails Master Plan, shows planned new trails in East Pleasanton. Existing map.

16. Proposed and Approved Development Projects. Shows development projects proposed and approved within and adjacent to the EPPF study area. Map prepared for EPPF project.

BACKGROUND DOCUMENTS
The following documents contain background information relevant to the EPPF project (click for links).

City of Pleasanton

1. ONE Pleasanton 5-Year Strategic Plan. Strategies to build a community where everyone belongs (page 16) calls for the City to “advance the East Pleasanton Specific Plan.”

2. General Plan. The Land Use Element, beginning on page 2-11, describes East Pleasanton as an area of special interest. Land Use Element Program 6.1 calls for the City to prepare an East Pleasanton Specific Plan.

3. Trails Master Plan. Page 63 shows planned new trails in East Pleasanton.

4. Bicycle and Pedestrian Master Plan. Page 63 shows proposed vision network bicycle facilities in East Pleasanton.

5. Climate Action Plan. Pages 40-45 describe transportation and land use strategies to reduce greenhouse gas emissions.

6. Draft East Pleasanton Specific Plan. The 2014 Draft East Pleasanton Specific Plan (not adopted) established a vision for future development in the East Pleasanton Specific Plan area.

7. Draft EIR for the East Pleasanton Specific Plan. The Draft Environmental Impact Report (EIR) for the East Pleasanton Specific Plan analyzes potential environmental impacts that would have resulted from adoption of the Specific Plan.

8. East Pleasanton Fiscal Impact Analysis. Prepared in 2025, analyzes the net fiscal impacts of the proposed Arroyo Lago, East Lakes, and Parcel H development on the City’s General Fund.

Other Agencies

1. Livermore Airport Land Use Compatibility Plan. Establishes land use compatibility criteria in the area surrounding the Livermore Airport.

2. Preliminary Lake Use Evaluation for the Chain of Lakes. Prepared in 2014, evaluates the suitability of quarry lands for different water management, resource protection, and recreation uses.

3. Preliminary Lake Use Evaluation for the Chain of Lakes - 2020 Update. Updates and expands the suitability analysis of quarry lands for future uses.

4. Livermore General Plan. The Livermore General Plan Land Use Map designates lands within the Livermore Planning area as “Open Space / Sand and Gravel”. The primary use allowed in this designation is open space, with sand and gravel extraction, processing, and related activities allowed as secondary uses.

5. East County Area Plan. A portion of the Alameda County General Plan, establishes County goals and policies for the portion of unincorporated Alameda County that includes the EPPF study area.

6. Alameda County Zoning Code. Establishes land use regulations and development standards for unincorporated properties in the EPPF study area.

7. Specific Plan for Livermore-Amador Valley Quarry Area Reclamation. Adopted in 1981, establishes reclamation plan for the quarries in the EPPF study area.

8. Arroyo Lago Draft EIR. The Draft Environmental Impact Report (EIR) for the proposed Arroyo Lago project, prepared by Alameda County, analyzes potential environmental impacts from the project if developed in the County.

Lake H
Cope Lake
Lake I
El Charro Rd
Martin Ave
Busch Rd
Stanley Blvd
El Charro Rd W Jack London Blvd
Isabel Ave
¯
0 1,000 2,000500 Feet
Study Area
Core Area
EPPF Boundaries
Figure 1: Study Area Boundaries
Lake H
Cope Lake
Lake I
El Charro Rd
Martin Ave
Busch Rd
Stanley Blvd
El Charro Rd W Jack London Blvd
Isabel Ave
¯
0 0.25 0.50.13 Miles
EPPF Study Area
Pleasanton Urban Growth Boundary
Pleasanton City Limits
Pleasanton Sphere of Influence
Figure 2: Pleasanton Boundaries

Page 5 ends

Lake H
Cope Lake
Lake I
El Charro Rd
Martin Ave
Busch Rd
Stanley Blvd
El Charro Rd W Jack London Blvd
Isabel Ave
¯
0 0.25 0.50.13 Miles
EPPF Study Area
Livermore Urban Growth Boundary
East County Measure D Urban Growth Boundary
Livermore City Limit and Sphere of Influence
Figure 3: Livermore & County Boundaries

Page 6 ends

Lake H
Cope Lake
Lake I
El Charro Rd
Martin Ave
Stanley Blvd
El Charro Rd W Jack London Blvd
Isabel Ave
0 1,000 2,000500 Feet
EPPF Study Area Figure 4: Existing Uses
Lake H
Cope Lake
Lake I
El Charro Rd
Martin Ave
Stanley Blvd
El Charro Rd W Jack London Blvd
Isabel Ave
0 1,000 2,000500 Feet
EPPF Study Area
*Site Currently Vacant
Busch Rd
ResidentialResidential
OutletsOutlets
Golf CourseGolf Course
Livermore
Municipal Airport
Livermore
Municipal Airport
Approved IndustrialApproved Industrial
Oaks
Business Park
Oaks
Business Park
Approved
Industrial
Approved
Industrial
Gravel
Quarries
Gravel
QuarriesGravel
Quarries
Gravel
QuarriesShadow Cliffs
Regional
Recreation Area
Shadow Cliffs
Regional
Recreation Area
CommercialCommercial
ResidentialResidential
Shopping
Centers
Shopping
Centers
Proposed Parcel H
Industrial Project*
Proposed Parcel H
Industrial Project*
Gravel
Quarries
Gravel
Quarries
VacantVacant
PGS
Facility
PGS
Facility
Proposed
Amazon
Warehouse
Project*
Proposed
Amazon
Warehouse
Project*
Approved
Seefried
Residential
Project
Approved
Seefried
Residential
Project
Proposed
East Lakes
Residential
Project*
Proposed
East Lakes
Residential
Project*
VacantVacant
VacantVacant
City Operations
Service Center
City Operations
Service Center
Proposed
Arroyo Lago
Residential
Project*
Proposed
Arroyo Lago
Residential
Project*

Page 11 ends

El Charro Rd
0 0.25 0.50.13 Miles
EPPF Study Area Figure 5: Parcelization and Ownership
Martin Ave
Stanley Blvd
W Jack London Blvd
Isabel Ave
SteelwaveSteelwave
PGSPGS
Pleasanton GravelPleasanton Gravel
VulcanVulcan
KiewitKiewit
City of
Pleasanton
City of
Pleasanton
AmazonAmazon
SteelwaveSteelwave
Zone 7Zone 7
SteelwaveSteelwave
Pleasanton GravelPleasanton Gravel

Page 13 ends

Lake H
Cope Lake
Lake I
El Charro Rd
Martin Ave
Busch Rd
Stanley Blvd
El Charro Rd W Jack London Blvd
Isabel Ave
¯
0 0.25 0.50.13 Miles
EPPF Study Area Figure 8: Alameda County
General Plan Land Use
I
LPA
LPA
LPA
LPA
WM
WM
WMWM
P
MDR
I
MDR
Land Use Designation
Industrial (I)
Large Parcel Agriculture (LPA)
Medium Density Residential (MDR)
Mixed Use (MU)
Parklands (P)
Water Management (WM)

Page 10 ends

Lake H
Cope Lake
Lake I
El Charro Rd
Martin Ave
Busch Rd
Stanley Blvd
El Charro Rd W Jack London Blvd
Isabel Ave
¯
0 0.25 0.50.13 Miles
EPPF Study Area
Livermore City Limits
Figure 9: Livermore General Plan Land
Use
Land Use Designation
Business and Commerical Park (BCP)
Airport (CF-AIR)
Isabel Neighborhood (IN)
Limited Agriculture (LDAG)
Low Intensity Industrial (LII)
Parks, Trailways, Recreation Areas (OSP)
Urban High Residential (6-8 du/ac) (UH-1)
Urban Low Medium Residential (ULM)
Urban Medium Residential (UM)
Urban High Residential (8-14 du/ac) (UH-2)
CF-AIR
IN
CF-AIR
OSP
Text
BCP
LDAG
LII
LII
BCP
UM
ULM
UM
OSP
LII

Page 9 ends

Figure 3-2
Approximate Project Site Boundaries Map
Oaks
Business
Park
Single-Family
Residences
Gravel Quarries/
Industrial Ponds
Legend:

SMP 38 (SOI Amendment Only)
SMP 39 and SMP 40 (Annexation and Development Area)
Additional Annexation Only Parcels
E xisting City of Livermore Limits
E xisting City of Livermore SOI
E xisting City of Livermore South Livermore UGB
E xisting City of Pleasanton SOI
Las Positas
Golf Course
Livermore
Municipal
Airport
Gravel Quarries/
Industrial Ponds
San Francisco
Premium Outlets
Undeveloped
Land

Page 22 ends

Figure 10: Livermore SMP Site Plan
Lake H
Cope Lake
Lake I
El Charro Rd
Martin Ave
Busch Rd
Stanley Blvd
El Charro Rd W Jack London Blvd
Isabel Ave
0 1,000 2,000500 Feet
EPPF Study Area Figure 11: Future Use Discussion Sites
Lake H
Cope Lake
Lake I
El Charro Rd
Martin Ave
Stanley Blvd
El Charro Rd W Jack London Blvd
Isabel Ave
0 1,000 2,000500 Feet
EPPF Study Area
Future Use Discusssion Sites

1. City of Pleasanton Operations Service Center (OSC)

2. Pleasanton Garbage Serbive (PGS) Transfer Station

3. Vacant USL/Steelwave Parcel

4. Vacant USL/Steelwave Parcels

5. Vacant SMP 38 Parcels

6. Active Quarry and Industrial Pond Parcels
Busch Rd
55 66
44 33
22 11

Page 14 ends

Preliminary Lake Use Evaluation for the Chain of Lakes ADDENDUM 1 2 Figure 1-1. Future Chain of Lakes configuration showing existing and planned facilities, 2020.

Page 19 ends

Figure 12: Chain of Lakes
Configuration (Zone 7)
Preliminary Lake Use Evaluation for the Chain of Lakes ADDENDUM 1 34 Figure 4-18. Summary map of potential Primary Uses by lake, 2020.

Page 20 ends

Figure 13: Chain of Lakes Potential
Primary Uses (Zone 7)
Preliminary Lake Use Evaluation for the Chain of Lakes ADDENDUM 1 35 Figure 4-19. Summary map of potential Secondary Uses by lake, 2020. (NOTE: This analysis does not propose or approve these uses; all formal proposals would be brought to the Board of
Directors for specific consideration.)

Page 21 ends

Figure 14: Chain of Lakes Potential
Secondary Uses (Zone 7)
Figure 3-2: Future Trail System Detail Map

Page 16 ends

Figure 15: Future Trail System
Lake H
Cope Lake
Lake I
El Charro Rd
Martin Ave
Busch Rd
Stanley Blvd
El Charro Rd W Jack London Blvd
Isabel Ave
0 1,000 2,000500 Feet
EPPF Study Area
Lake H
Cope Lake
Lake I
El Charro Rd
Martin Ave
Stanley Blvd
El Charro Rd W Jack London Blvd
Isabel Ave
0 1,000 2,000500 Feet
EPPF Study Area Figure 16: Recent
Development Applications
Pleasanton Application

1. Parcel H: 300,000 sq. ft. industrial office (proposed)

2. Amazon: 640,000 sf. ft. warehouse (proposed)

3. Seefried: 310 single-family and 1 multifamily homes (approved) County and Pleasanton Applications

4. Arroyo Lago: 189 single-family homes (proposed)

5. East Lakes: 330 single-family and multi-family homes (proposed) Livermore Applications

6. SMP 39: 755,500 sq. ft. industrial (approved)

7. SMP 40: 759,275 sq. ft. industrial (approved)
55 11
22 33
66 77
44 Busch Rd

Page 12 ends

East Pleasanton Policy Framework Project
Joint City Council and Planning Commission Workshop
September 16, 2025
Workshop Purpose
•Introduce the East Pleasanton Policy Framework (EPPF)
project
•Present relevant background information
•Receive feedback on key policy questions for continued study •Receive any additional input and feedback on the EPPF project 2 Part 1: Project Background
• Project Origins and Purpose
• Process and Schedule
• Public Engagement
• Work Completed
Part 2: Key Policy Questions
• City Boundaries
• Land Uses
• Open Space and Recreation
• Public Service Facilities
• Infrastructure and Circulation
Presentation Overview
3 Pleasanton General Plan
•Identifies East Pleasanton as
an “area of special interest”
•Land Use Map designates
area as East Pleasanton
Specific Plan
•Calls for City to prepare a
Specific Plan for this area

ĂƐƚWůĞĂƐĂŶƚŽŶ^ƉĞĐŝĨŝĐWůĂŶƌĞĂ
4 East Pleasanton Specific Plan
•2012: Work began
•2014: Draft Plan and EIR
•2015: Work stopped
•2019: Work resumed
•2020: Work stopped
(COVID)
5 WůĞĂƐĂŶƚŽŶƉƉůŝĐĂƚŝŽŶƐ
WĂƌĐĞů,͗ ϯϬϬ͕ϬϬϬƐƋ͘Ĩƚ͘ŝŶĚƵƐƚƌŝĂůĂŶĚ
ŽĨĨŝĐĞ;ƉƌŽƉŽƐĞĚͿ
ŵĂnjŽŶ͗ ϲϰϬ͕ϬϬϬƐƋ͘Ĩƚ͘ǁĂƌĞŚŽƵƐĞ
;ƉƌŽƉŽƐĞĚͿ
^ĞĞĨƌŝĞĚ͗ϯϭϬƐŝŶŐůĞͲĨĂŵŝůLJĂŶĚϭϬϮ
ŵƵůƚŝĨĂŵŝůLJŚŽŵĞƐ;ĂƉƉƌŽǀĞĚͿ
ŽƵŶƚLJĂŶĚWůĞĂƐĂŶƚŽŶƉƉůŝĐĂƚŝŽŶƐ
ƌƌŽLJŽ>ĂŐŽ͗ϭϴϵƐŝŶŐůĞͲĨĂŵŝůLJŚŽŵĞƐ
;ƉƌŽƉŽƐĞĚͿ

ĂƐƚ>ĂŬĞƐ͗ΕϯϯϬƐŝŶŐůĞͲĨĂŵŝůLJĂŶĚΕϯϲϳ
ŵƵůƚŝͲĨĂŵŝůLJŚŽŵĞƐ;ƉƌŽƉŽƐĞĚͿ
>ŝǀĞƌŵŽƌĞƉƉůŝĐĂƚŝŽŶƐ
^DWϯϵʹ ϳϱϱ͕ϱϬϬƐƋƵĂƌĞĨĞĞƚŝŶĚƵƐƚƌŝĂů
;ĂƉƉƌŽǀĞĚͿ
^DWϰϬͲʹ ϳϱϵ͕ϮϳϱƐƋƵĂƌĞĨĞĞƚŝŶĚƵƐƚƌŝĂů
;ĂƉƉƌŽǀĞĚͿ
Recent Development Applications
6 City Council Direction
February 4, 2025:
• Process annexation and development applications for the Arroyo Lago and East Lakes projects
• Initiate East Pleasanton Policy Framework process:
• Streamlined process
• Independent from City review of currently proposed projects • Update General Plan vision and policies for East Pleasanton • Subsequent actions needed for any changes to City boundaries or land use designations
7 EPPF Process
and Schedule
8 EPPF Boundaries
ŽƌĞƌĞĂ
^ƚƵĚLJƌĞĂ
9 Work Completed
•Background Material Review
•Pleasanton materials
•Materials from other agencies
•Existing Conditions Maps
•Collected existing maps
•New maps
•Preliminary Issues List
•Stakeholder Meetings

1. Landowner/developers (Steelwave/USL,
Amazon, Seefried)

2. Parks and recreation (EBRPD)

3. Neighboring jurisdictions (Livermore,
Alameda County)

4. Quarry operators (Pleasanton Gravel)

5. Environmental health and wastewater
agencies (ACDEH, DSRSD)

6. Public service providers (Schools, Police,
Fire)

7. Pleasanton Garbage Service

8. Zone 7 Water Agency
EPPF Stakeholder Groups
10 Stakeholder Interviews
Noteworthy Information Shared:
• East Bay Regional Park District Master
Plan Update
• Priority Conservation Area Designation
• Livermore General Plan Update
• Zone 7 Flood Management Plan
• Chain of Lakes Configuration
• Pleasanton Gravel Company Planning
• PGS operations and concerns
• Continued Mining Timeline
• Police and Fire Department OSC Facilities
11 Key Policy Topics
Topic areas for further study, consideration
of policy options:
• City boundaries
• Land uses
• Open space and recreation
• Public service facilities
• Infrastructure and circulation
12 City Boundaries
• City Limits
• Boundary of incorporated City of Pleasanton
• Area where City has zoning control, police powers, and provides public services
• Urban Growth Boundary
• Area suitable for urban development beyond which the City will not provide public facilities and services
• Approved by voters in 1996
• Sphere of Influence
• Adopted by the Alameda County Local Agency Formation Commission (LAFCO)
• Represents the probable ultimate physical boundary and service area of Pleasanton, as determined by LAFCO
13 Pleasanton Boundaries
ŝƚLJŽĨWůĞĂƐĂŶƚŽŶ
hƌďĂŶ'ƌŽǁƚŚŽƵŶĚĂƌLJ
^ƉŚĞƌĞŽĨ/ŶĨůƵĞŶĐĞ
14 Pleasanton Boundaries
ŝƚLJŽĨWůĞĂƐĂŶƚŽŶ
hƌďĂŶ'ƌŽǁƚŚŽƵŶĚĂƌLJ
^ƉŚĞƌĞŽĨ/ŶĨůƵĞŶĐĞ
/ŶƐŝĚĞŝƚLJ>ŝŵŝƚďƵƚ
ŽƵƚƐŝĚĞhƌďĂŶ'ƌŽǁƚŚ
ŽƵŶĚĂƌLJ
15 City Boundaries
Recommended Policy Questions:
• Should Pleasanton adjust its urban growth boundary (UGB) in East Pleasanton? If so, what UGB changes should be made? Are there specific areas that should be brought inside the UGB?
• Are there any specific areas, currently outside the City Limit, that should be annexed into Pleasanton?
• Should the General Plan continue to call for the City to prepare a Specific Plan for East Pleasanton? If so, what are the preferred boundaries for this area? 16 Land Use
17 • Existing land uses and ownership
• General Plan and Zoning
• Existing development applications
• Future use discussion areas
EPPF
Existing Land Uses
18 EPPF
Parcelization and
Ownership
19 Pleasanton General
Plan Land Use Map
20 Pleasanton Zoning
21 WůĞĂƐĂŶƚŽŶƉƉůŝĐĂƚŝŽŶƐ
WĂƌĐĞů,͗ ϯϬϬ͕ϬϬϬƐƋ͘Ĩƚ͘ŝŶĚƵƐƚƌŝĂůĂŶĚ
ŽĨĨŝĐĞ;ƉƌŽƉŽƐĞĚͿ
ŵĂnjŽŶ͗ ϲϰϬ͕ϬϬϬƐƋ͘Ĩƚ͘ǁĂƌĞŚŽƵƐĞ
;ƉƌŽƉŽƐĞĚͿ
^ĞĞĨƌŝĞĚ͗ϯϭϬƐŝŶŐůĞͲĨĂŵŝůLJĂŶĚϭϬϮ
ŵƵůƚŝĨĂŵŝůLJŚŽŵĞƐ;ĂƉƉƌŽǀĞĚͿ
ŽƵŶƚLJĂŶĚWůĞĂƐĂŶƚŽŶƉƉůŝĐĂƚŝŽŶƐ
ƌƌŽLJŽ>ĂŐŽ͗ϭϴϵƐŝŶŐůĞͲĨĂŵŝůLJŚŽŵĞƐ
;ƉƌŽƉŽƐĞĚͿ

ĂƐƚ>ĂŬĞƐ͗ϯϯϬƐŝŶŐůĞͲĨĂŵŝůLJĂŶĚϯϲϳ
ŵƵůƚŝͲĨĂŵŝůLJŚŽŵĞƐ;ƉƌŽƉŽƐĞĚͿ
>ŝǀĞƌŵŽƌĞƉƉůŝĐĂƚŝŽŶƐ
^DWϯϵͲʹ ϳϱϱ͕ϱϬϬƐƋƵĂƌĞĨĞĞƚŝŶĚƵƐƚƌŝĂů
;ĂƉƉƌŽǀĞĚͿ
^DWϰϬͲʹ ϳϱϵ͕ϮϳϱƐƋƵĂƌĞĨĞĞƚŝŶĚƵƐƚƌŝĂů
;ĂƉƉƌŽǀĞĚͿ
ZĞĐĞŶƚĞǀĞůŽƉŵĞŶƚƉƉůŝĐĂƚŝŽŶƐ
22 ŝƚLJŽĨWůĞĂƐĂŶƚŽŶKƉĞƌĂƚŝŽŶƐ^ĞƌǀŝĐĞ
ĞŶƚĞƌ;K^Ϳ
WůĞĂƐĂŶƚŽŶ'ĂƌďĂŐĞ^ĞƌǀŝĐĞ;W'^Ϳ
dƌĂŶƐĨĞƌ^ƚĂƚŝŽŶ
sĂĐĂŶƚh^>ͬ^ƚĞĞůǁĂǀĞ WĂƌĐĞů
sĂĐĂŶƚh^>ͬ^ƚĞĞůǁĂǀĞ WĂƌĐĞůƐ
sĂĐĂŶƚ^DWϯϴWĂƌĐĞůƐ
ĐƚŝǀĞYƵĂƌƌLJĂŶĚ/ŶĚƵƐƚƌŝĂůWŽŶĚ
WĂƌĐĞůƐ
&ƵƚƵƌĞhƐĞŝƐĐƵƐƐŝŽŶƌĞĂƐ
23 Land Use
Recommended Policy Questions:
• What is the preferred range of future land uses in East Pleasanton? • What are the preferred land uses, including development and open space uses, for specific areas?
• Should existing allowed uses, as established by the General Plan and Zoning Code, change?
24 Open Space and Recreation
General Plan Community Separator Policies
• Designates Lake I, Lake H, and Cope Lake as water management and recreation to “act as community separators on the east edge of Pleasanton where no significant development is allowed” (p. 2-26)
• Calls for the City to “enhance community identity through the protection of community separators, scenic hillsides, and ridgelines.” (p. 14-23) • Describes the quarry lands as a “valuable urban separator between Pleasanton and Livermore” that should be substantially protected (p. 2-12) 25 Chain of Lakes
• Series of former quarry lakes in the Livermore ǦAmador Valley • Intended to be used for water management and related purposes by Zone 7 Water Agency (Zone 7)
• Quarry reclamation plans must comply with surface mining permits and the Specific Plan for Livermore ǦAmador Valley Quarry Area Reclamation (LAVQAR) • Quarry owners and operators must enter into agreements with Zone 7 that establish terms and conditions for reclamation activities. 26 Zone 7 Future Chain of Lakes Configuration (2020)
Source:

Addendum 1 – 2020 Update
Preliminary Lake Use Evaluation
for the Chain of Lakes
27 Source:

Addendum 1 – 2020 Update
Preliminary Lake Use Evaluation
for the Chain of Lakes
28 Source:

Addendum 1 – 2020 Update
Preliminary Lake Use Evaluation
for the Chain of Lakes
29 Pleasanton Trails Master
Plan (2020)
Future Trail System Map
East Pleasanton Area
30 Open Space and Recreation
Recommended Policy Questions:
• Should an open space buffer be maintained between Pleasanton and Livermore? If so, how should it be defined?
• What types of new recreational amenities, if any, should be provided in East Pleasanton?
• How should new development, open space, and recreational facilities interface with the Chain of Lakes?
31 Public Service Facilities
Two public service facilities
in study area:
• City Operations Service
Center (OSC)
• PGS Waste Transfer Station
ŝƚLJKƉĞƌĂƚŝŽŶƐ
ŝƚLJKƉĞƌĂƚŝŽŶƐ
^ĞƌǀŝĐĞĞŶƚĞƌ
W'^tĂƐƚĞ
W'^ tĂƐƚĞ
dƌĂŶƐĨĞƌ^ƚĂƚŝŽŶ
32 WƌŽƉŽƐĞĚ
WƌŽƉŽƐĞĚ
ƌƌŽLJŽ>ĂŐŽ
LJŐ
ƌƌŽLJŽ>ĂŐŽ
ZĞƐŝĚĞŶƚŝĂů
ZĞƐŝĚĞŶƚŝĂů
WƌŽũĞĐƚ
ƉƉƌŽǀĞĚ
ƉƉƌŽǀĞĚ
^ĞĞĨƌŝĞĚ
^ĞĞĨƌŝĞĚ
ZĞƐŝĚĞŶƚŝĂů
ZĞƐŝĚĞŶƚŝĂů
WƌŽũĞĐƚ
ŝƚLJKƉĞƌĂƚŝŽŶƐ
ŝƚLJKƉĞƌĂƚŝŽŶƐ
^ĞƌǀŝĐĞĞŶƚĞƌ
ƌǀŝĐĞĞŶƚ
;K^Ϳ
City Operations Service Center (OSC)
Used by the:
• City of Pleasanton Public Works
Department
• Pleasanton Police Department
• Livermore-Pleasanton Fire Department
• Site of City Groundwater Well 8
33 WƌŽƉŽƐĞĚ
WƌŽƉŽƐĞĚ
ƌƌŽLJŽ>ĂŐŽ
LJ Ő
ƌƌŽLJŽ>ĂŐŽ
ZĞƐŝĚĞŶƚŝĂů
ZĞƐŝĚĞŶƚŝĂů
WƌŽũĞĐƚ^ŝƚĞ
ƉƉƌŽǀĞĚ
ƉƉƌŽǀĞĚ
^ĞĞĨƌŝĞĚ
^ĞĞĨƌŝĞĚ
ZĞƐŝĚĞŶƚŝĂů
ZĞƐŝĚĞŶƚŝĂů
WƌŽũĞĐƚ^ŝƚĞ
W'^tĂƐƚĞ
W'^tĂƐƚĞ
dƌĂŶ ƐĨĞƌ
dƌĂŶ ƐĨĞƌ
&ĂĐŝůŝƚLJ
Waster Transfer Station
Property owned and operated by
Pleasanton Garbage Service (PGS)
WƌŽƉŽƐĞĚ
WƌŽƉŽƐĞĚ
ŵĂnjŽŶ
ŵĂnjŽŶ
tĂƌĞŚŽƵƐĞ
tĂƌĞŚŽƵƐĞ
WƌŽũĞĐƚ
WƌŽƉŽƐĞĚ
WƌŽƉŽƐĞĚ

ĂƐƚ>ĂŬĞƐ

ĂƐƚ>ĂŬĞƐ
ZĞƐŝĚĞŶƚŝĂů
ZĞƐŝĚĞŶƚŝĂů
WƌŽũĞĐƚ^ŝƚĞ
34 Public Service Facilities
Recommended Policy Questions:
• What is the preferred future of the existing OSC and waste transfer facilities? • Should these existing facilities be relocated? If so, where? 35 Infrastructure and Circulation
• East Pleasanton development will require on-site and off-site infrastructure improvements
• On-site infrastructure funded and constructed by developer • City expectations:
• Off-site water and wastewater infrastructure funded entirely by new development. • New roadway construction, including El Charro Road, funded by both new development and City
36 Infrastructure and Circulation
• East Pleasanton development will require on-site and off-site infrastructure improvements
On-site Off-site
Water
Developer DeveloperSewer
Roads* City and Developer
*Including El Charro
Infrastructure Funding Source
ŝƚLJŝƐĞdžƉůŽƌŝŶŐĨŝŶĂŶĐŝŶŐŽƉƚŝŽŶƐ
37 Infrastructure and Circulation
• Economic analysis for East Pleasanton Specific Plan found preferred land use alternative economically feasible only with:
• Accelerated unit production; and
• Plan changes to increase land values
• Analysis assumed:
• Developers fund and construct shared public infrastructure • Mello-Roos Community Facilities District (CFD) bond used to finance project wide infrastructure.
38 Infrastructure and Circulation
Recommended Policy Questions:
• What mechanisms should the City use to finance public infrastructure in the EPPF study area?
• What amount and type of new development is needed so that it is economically feasible for development projects to finance needed public infrastructure? • Should the City allow additional development in East Pleasanton to help finance El Charro Road?
39 Requested Input
Staff requests City Council and Planning Commission:
• Confirm that the policy questions above should be the focus of continued study; and
• Provide any preliminary input on these policy questions or other project issues. • After receiving City Council and Planning Commission input, staff and consultants will develop options to address the policy questions, and prepare analysis as needed to allow for an informed consideration of the options. City staff will present these options and analysis to the Planning Commission and City Council in early 2026.
40 Next Steps
• Refine policy question based on City Council and Planning Commission input • Develop options to address the policy questions
• Prepare analysis of options
• Hold Planning Commission and City Council work sessions in early 2026 to consider policy options
41