% of Average Supply
Average Year 100%
Single-Dry Year
Consecutive Dry Years 1st Year
Consecutive Dry Years 2nd Year
Consecutive Dry Years 3rd Year
Consecutive Dry Years 4th Year
Consecutive Dry Years 5th Year
NOTES:

DWR NOTES: Supplier may use multiple versions of Submittal Table 7-1 R if different water sources have different base years and the supplier chooses to report the base years for each water source separately. If a Supplier uses multiple versions of Submittal Table 7-1 R, in the "Note" section of each submittal table, state that multiple versions of Submittal Table 7-1 R are being used and identify the particular water source that is being reported in each submittal table.

Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. This table reports the units of measure reported in Submittal Table 2-3.

Year Type
Base Year
If not using a calendar
year, type in the last
year of the fiscal,
water year, or range
of years, for example,
water year 2024-2025,
use 2025
Optional Submittal Table 7-1 Retail: Basis of Water Year Data (Reliability Assessment) Available Supplies if
Year Type Repeats
Check the box if quantification of available supplies is not compatible with this table and is provided elsewhere in the UWMP.

Location: Table 7-2 and Table 7-3
Volume Available (AF)
Quantification of available supplies is provided in this table as either volume only, percent only, or both.

Page 554 of 632 ends

2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF) 2050 (AF)
Supply totals
(autofill from Submittal Table 6-
9 R)
16,401 17,288 18,178 19,172 0
Use totals
(autofill from Submittal Table 4-
2 R)
16,401 17,288 18,178 19,172 0
Surplus/(shortfall) 0 0 0 0 0
WSCP - supply augmentation
benefit
WSCP - use reduction savings
benefit
Revised Surplus/(shortfall)
OPTIONAL Planned WSCP Actions
Submittal Table 7-2 Retail: Normal Year Supply and Use Comparison Water Code Section 10635 (a)
NOTES:

DWR NOTES : Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3.

Page 555 of 632 ends

Supply totals 16,401 17,288 18,178 19,172
Use totals 16,401 17,288 18,178 19,172
Surplus/(shortfall) 0 0 0 0
WSCP - supply
augmentation benefit
WSCP - use reduction
savings benefit
Revised Surplus/(shortfall)
Submittal Table 7-3 Retail: Single Dry Year Supply and Use Comparison Water Code Section 10635(a)
OPTIONAL Planned WSCP Actions
2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF)
DWR NOTES : Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3.

NOTES
2050 (AF)

Page 556 of 632 ends

2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF) 2050 (AF)
Supply totals 16,401 17,288 18,178 19,172
Use totals 16,401 17,288 18,178 19,172
Surplus/(shortfall) 0 0 0 0 0
WSCP - supply augmentation benefit
WSCP - use reduction savings benefit
Revised Surplus/(shortfall)
Supply totals 16,401 17,288 18,178 19,172
Use totals 16,401 17,288 18,178 19,172
Surplus/(shortfall) 0 0 0 0 0
WSCP - supply augmentation benefit
WSCP - use reduction savings benefit
Revised Surplus/(shortfall)
Supply totals 16,401 17,288 18,178 19,172
Use totals 16,401 17,288 18,178 19,172
Surplus/(shortfall) 0 0 0 0 0
WSCP - supply augmentation benefit
WSCP - use reduction savings benefit
Revised Surplus/(shortfall)
Supply totals 16,401 17,288 18,178 19,172
Use totals 16,401 17,288 18,178 19,172
Surplus/(shortfall) 0 0 0 0 0
WSCP - supply augmentation benefit
WSCP - use reduction savings benefit
Revised Surplus/(shortfall)
Supply totals 16,401 17,288 18,178 17,212
Use totals 16,401 17,288 18,178 19,172
Surplus/(shortfall) 0 0 0 (1,960) 0
WSCP - supply augmentation benefit
WSCP - use reduction savings benefit 0 0 0 1,960
Revised Surplus/(shortfall) 0 0 0 0
NOTES:

While this reliability assessment is prepared based on the prescribed approach in DWR’s 2025 Guidebook, the City anticipates that it would implement WSCP in earlier years of drought.

First year
OPTIONAL WSCP Actions Second year
Third year
Fifth year
DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3.

OPTIONAL Planned WSCP Actions
OPTIONAL Planned WSCP Actions
OPTIONAL Planned WSCP ActionsFourth year
Submittal Table 7-4 Retail: Multiple Dry Years Supply and Use Comparison Water Code Section 10635(a)
OPTIONAL Planned WSCP Actions

Page 557 of 632 ends

2026 Total
Total Water Use (AF) 14,269
Total Supplies (AF) 14,269
Surplus/Shortfall w/o WSCP Action 0
WSCP - supply augmentation benefit (AF)
WSCP - use reduction savings benefit (AF)
Revised Surplus/(shortfall)
2027 Total
Total Water Use (AF) 14,802
Total Supplies (AF) 14,802
Surplus/Shortfall w/o WSCP Action 0
WSCP - supply augmentation benefit (AF)
WSCP - use reduction savings benefit (AF)
Revised Surplus/(shortfall)
2028 Total
Total Water Use (AF) 15,335
Total Supplies (AF) 15,335
Surplus/Shortfall w/o WSCP Action 0
WSCP - supply augmentation benefit (AF)
WSCP - use reduction savings benefit (AF)
Revised Surplus/(shortfall)
2029 Total
Total Water Use (AF) 15,868
Total Supplies (AF) 15,868
Surplus/Shortfall w/o WSCP Action 0
WSCP - supply augmentation benefit (AF)
WSCP - use reduction savings benefit (AF)
Revised Surplus/(shortfall)
2030 Total
Total Water Use (AF) 16,401
Total Supplies (AF) 16,401
Surplus/Shortfall w/o WSCP Action 0
WSCP - supply augmentation benefit (AF)
WSCP - use reduction savings benefit (AF)
Revised Surplus/(shortfall)
NOTES:

DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3.

Submittal Table 7-5 Retail: Five-Year Drought Risk Assessment Water Code Section 10635(b)(3)
OPTIONAL Planned WSCP Actions (use reduction and supply augmentation)
OPTIONAL Planned WSCP Actions (use reduction and supply augmentation)
OPTIONAL Planned WSCP Actions (use reduction and supply augmentation)
OPTIONAL Planned WSCP Actions (use reduction and supply augmentation)
OPTIONAL Planned WSCP Actions (use reduction and supply augmentation)

Page 558 of 632 ends

Standard
Shortage
Levels
Percent Shortage
Range
Suppliers
Shortage
Levels
Percent
Shortage Range
1 Up to 10%
2 Up to 20%
3 Up to 30%
4 Up to 40%
5 Up to 50%
6 >50%
Submittal Table 8-1: Cross-reference for Standard vs
Supplier Shortage Levels
Water Code Section 10632(a)(3)(B)
Check the box if the Supplier uses the Standard
six levels of water shortage.

Proceed to the next table.

NOTES:

Page 559 of 632 ends

Yes
Volume or
Percentage
Drop down
Shortage Gap
Reduction Value
(May be a range) (AF)
1 No action taken
2 No action taken
3 No action taken
4 No action taken
5 No action taken
6 Stored emergency supply Up to the shortage gap Request for the expansion of GPQ from Zone

7. Submittal Table 8-2 Retail: Supply Augmentation and Other Actions Water Code Section 10632(a)(4)(A),(C) and (E)
Add additional rows as needed
NOTES:

Is the Supplier completing this table using the standard six levels? (yes/no) How much is this going to reduce the
shortage gap?
DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3.

Shortage
Level
Supply Augmentation Methods and
Other Actions by Water Supplier
Drop down list
These are the only categories that will be
accepted by the WUEdata online submittal tool
Additional Explanation or Reference
(OPTIONAL)

Page 560 of 632 ends

Yes
Volume or Percentage
Drop down
Shortage Gap
Reduction Value
(May be a range)
(%)
1 Landscape - Restrict or prohibit runoff from
landscape irrigation
Percentage 15-20% PMC 9.30.080 A.1, 2, 6, 9, 10, 13. - Prohibit Irrigation with Potable Water in a Manner that causes Runoff (including prohibition of irrigation outside of the hours 9pm - 6 am or during and 48 hours after measurable rainfall)
No
1 Other - Prohibit use of potable water for washing
hard surfaces
Percentage <1% PMC 9.30.080 A.3. - Prohibit Use of Potable Water to Wash Sidewalks and Driveways; Prohibit the Use of Potable Water for Street Washing
No
1 Other - Require automatic shut of hoses Percentage <1% PMC 9.30.080 A.4. - Require Shut-Off Nozzles on Hoses for Vehicle Washing No 1 Other - Customers must repair leaks, breaks, and
malfunctions in a timely manner
Percentage <1% PMC 9.30.080 A.5. - Require Repair of all Leaks within 24 hours No 1 CII - Restaurants may only serve water upon
request
Percentage <1% PMC 9.30.080 A.7. - Prohibit Serving Drinking Water other than upon Request in Eating or Drinking Establishments
No
1 CII - Lodging establishment must offer opt out of
linen service
Percentage <1% PMC 9.30.080 A.8. - Provide Linen Service Opt Out Options No 1 Pools and Spas - Require covers for pools and spas Percentage <1% PMC 9.30.080 A.11. - Require Pool Covers No 1 Water Features - Restrict water use for decorative
water features, such as fountains
Percentage <1% PMC 9.30.080 A.12. - Prohibit Potable Water Use for Decorative Water Features that do not Recirculate Water
No
1 Expand Public Information Campaign Percentage <1% Agency Action - Gardening Workshops; Establish Drought Hotline; School Education Program; Media Campaign, Newspaper Articles, Website; Promote Water Conservation / Rebate Programs; Water Efficiency Workshops, Public Events; Water Bill Inserts; Home or Mobile Water Use Reports
No
1 Adjust Customer Billing Percentage <1% Agency Action - Move to Monthly Metering / Billing No 1 Reduce System Water Loss Percentage 0-2% Agency Action - Reduce Distribution System Pressures; Promote / Expand Use of Recycled Water; Audit and Reduce System Water Loss; Establish Retrofit on Resale Ordinance
No
2 Landscape - Other landscape restriction or
prohibition
Percentage <1% PMC 9.30.080 B.2. - Outdoor irrigation of lawn and ornamental landscaping limits (one day / week November-February; no more than three non-consecutive days per k M h O t b )
Yes
2 Expand Public Information Campaign (Enhanced) Percentage <1% PMC 9.30.080 B.3. & Agency Action - Commercial customer requirements for conservation messaging and expanded public education program No
2 Other - Prohibit use of potable water for
construction activities
Percentage <1% PMC 9.30.080 A.4. - Prohibit use of potable water for construction activities No Is the Supplier completing this table using the standard six levels? (yes/no) Submittal Table 8-3 Retail: Demand Reduction Actions
Water Code Section 10632(a)(4)(B),(D), and (E)
How much is this going to reduce the
shortage gap?
Shortage
Level
Demand Reduction Actions
Drop down list
These are the only categories that will be accepted
by the WUEdata online submittal tool. Select those
that apply.

Additional Explanation or Reference
(OPTIONAL)
Penalty, Charge, or
Other
Enforcement?
For Retail Suppliers Only
Drop Down List

Page 561 of 632 ends

Yes
Volume or Percentage
Drop down
Shortage Gap
Reduction Value
(May be a range)
(%)
Is the Supplier completing this table using the standard six levels? (yes/no) Submittal Table 8-3 Retail: Demand Reduction Actions
Water Code Section 10632(a)(4)(B),(D), and (E)
How much is this going to reduce the
shortage gap?
Shortage
Level
Demand Reduction Actions
Drop down list
These are the only categories that will be accepted
by the WUEdata online submittal tool. Select those
that apply.

Additional Explanation or Reference
(OPTIONAL)
Penalty, Charge, or
Other
Enforcement?
For Retail Suppliers Only
Drop Down List
3 Landscape - Limit landscape irrigation to specific
days
Percentage 0-5% PMC 9.30.080 C.2. - Outdoor irrigation of lawn and ornamental landscaping shall be limited to one day per week November through February, and no more than two non- consecutive days per week March through October.

Yes
3 CII - Commercial kitchens required to use pre-rinse
spray valves
Percentage <1% PMC 9.30.080 C.3. - Restaurant kitchens shall be equipped with low-flow rinse nozzles.

Yes
3 Decrease Line Flushing Percentage <1% Agency Action - Decrease Frequency and Length of Line Flushing Yes 3 Implement or Modify Drought Rate Structure or
Surcharge
Percentage 0-5% Agency Action - Implement Drought Rate Structure Yes 4 Other - Prohibit vehicle washing except at facilities using recycled or recirculating water
Percentage <1% PMC 9.30.080 D.2. - Prohibit Vehicle Washing Except with Recycled Water; Wash Car at Facility that Recycles the Water
Yes
4 Landscape - Limit landscape irrigation to specific
days
Percentage 0-5% PMC 9.30.080 D.3. - Outdoor watering restrictions for all customers. Single-family residential: hand-watering using a hose with a positive shut-off nozzle, drip, or subsurface irrigation on two non-consecutive days per week. All other customers

Yes
4 Offer Water Use Surveys Percentage <1% Agency Action - Conduct CII Surveys Targeting High Water Users; Conduct Irrigation Account Surveys; Conduct Water Use Surveys Targeting High Water Users Yes
5 Other water feature or swimming pool restriction Percentage <1% PMC 9.30.080 E.2. - Prohibit Filling of Pools Yes 5 Landscape - Prohibit certain types of landscape
irrigation
Percentage <1% PMC 9.30.080 E.3. - Prohibit use of potable water for decorative ponds, basins, lakes, waterways, and fountains.

Yes
6 Landscape - Prohibit certain types of landscape
irrigation
Percentage 0-5% The irrigation of turf or lawn using potable water is prohibited. All water customers, with the exception of commercial nurseries, golf courses, sport fields, and other water dependent industries, shall be limited in the use of all other non-lawn area watering to hand-watering from a container of less than five-gallon capacity on no more than two days per week. The aforementioned water dependent industries shall work with city staff under the direction of the director to develop an approved irrigation schedule.

Yes
6 Other Percentage <1% Laundromats are prohibited from using non-efficient washing machines. No NOTES: Actions listed in PMC §9.30.100 are listed by the closest available demand reduction action in the DWR reporting table dropdown list.

DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3.

Page 562 of 632 ends

City Name 60 Day Notice
Drop Down (yes/no)
Notice of Public
Hearing
Drop Down (yes/no)
City of Pleasanton Yes Yes
County Name
Drop Down List
60 Day Notice
Drop Down (yes/no)
Notice of Public
Hearing
Drop Down (yes/no)
Alameda County Yes Yes
Submittal Table 10-1 Retail: Notification to Cities and Counties Water Code Section 10621(b) and 10642
Add additional rows as needed
Add additional rows as needed
NOTES:
(a) This table lists only the cities and counties that the City is required to notify. See text for list of other cities, agencies, and stakeholders notified.

Page 563 of 632 ends

2025 Urban Water Management Plan
City of Pleasanton

APPENDIX C
Demonstration of Reduced Delta Reliance

Page 564 of 632 ends

EKI A80038.00 i DRAFT | April 2026
ZONE 7 WATER AGENCY
Reduced Reliance on the Delta

DRAFT | April 2026
EKI C20037.04

EKI ENVIRONMENT & WATER, INC. www.ekiconsult.com
2001 Junipero Serra Blvd, Suite 300 • Daly City, CA 94014

Page 565 of 632 ends

DRAFT | April 2026
i EKI C20037.04
Reduce Reliance on the Delta
Zone 7 Water Agency

TABLE OF CONTENTS
1 SACRAMENTO-SAN JOAQUIN DELTA REFORM ACT OF 2009 ..................................................... 1 2 REDUCED RELIANCE ANALYSIS ................................................................................................. 2 3 EXPECTED OUTCOMES FOR REDUCED RELIANCE ON THE DELTA ............................................. 10

TABLES (IN REPORT TEXT)
Table 1 Optional Calculation of Water Use Efficiency (DWR Table C-1) .................................................. 4 Table 2 Calculation of Service Area Water Demands Without Water Use Efficiency (DWR Table C-2) ... 5 Table 3 Calculation of Supplies Contributing to Regional Self-Reliance (DWR Table C-3) ....................... 6 Table 4 Calculation of Reliance on Water Supplies from the Delta Watershed (DWR Table C-4) ........... 8

Page 566 of 632 ends

Section 1
SACRAMENTO-SAN JOAQUIN DELTA REFORM ACT OF 2009
Zone 7 Water Agency
Reduce Reliance on the Delta
1 DRAFT | April 2026
The purpose of this document is to demonstrat e compliance with the Sacramento-San Joaquin Delta Reform Act of 2009. The Sacramento-San Joaquin Delt a Reform Act of 2009 is described below, followed by an analysis of Zone 7 Water Agency’s (Zone 7) reduced reliance in accordance with State protocols and expected outcomes for reduced reliance on the Delta.
1 SACRAMENTO-SAN JOAQUIN DELTA REFORM ACT OF 2009
Under the Sacramento-San Joaquin Delta Reform Act of 2009, state and local public agencies proposing a “covered action” in the Sacramento -San Joaquin Delta (Delta) must submit a written certification of consistency to the Delta Stewardship Council as to whether the covered action is consistent with applicable Delta Plan policies. Covered actions include a multi-year water transfer, conveyance facility, or new diversion that involves transferring water through, exporting water from, or using water in the Delta.

Anyone may appeal a certification of consistency, and if the Delta Stewardship Council grants the appeal, the covered action may not be implemented until the agency proposing the covered action submits a revised certification of consistency, and either no appeal is filed, or the Delta Stewardship Council denies the subsequent appeal.

An urban water supplier that anticipates participating in or receiving water from a proposed covered action is required to provide information in thei r 2015 and subsequent Urban Water Management Plans (UWMPs) that can then be used in the covered action process to demonstrate consistency with Delta Plan Policy WR P1, Reduce Reliance on the Delta Through Improved Regional Water Self-Reliance (WR P1).

WR P1 details what is needed for a covered action to demonstrate consistency with reduced reliance on the Delta and improved regional self-reliance. WR P1 subsection (a) states that:
(a) Water shall not be exported from, transferred through, or used in the Delta if all of the following apply:
(1) One or more water suppliers that would receive water as a result of the export, transfer, or use have failed to adequately contribute to reduced reliance on the Delta and improved regional self- reliance consistent with all of the requirements listed in paragraph (1) of subsection (c); (2) That failure has significantly caused the need for the export, transfer, or use; and (3) The export, transfer, or use would have a significant adverse environmental impact in the Delta.

WR P1 subsection (c)(1) further defines what adequa tely contributing to reduced reliance on the Delta means in terms of (a)(1) above.
(c)(1) Water suppliers that have done all the following are contributing to reduced reliance on the Delta and improved regional self-reliance and are therefore consistent with this policy:
(A) Completed a current Urban or Agricultural Water Management Plan (Plan) which has been reviewed by the California Department of Wa ter Resources for compliance with the applicable requirements of Water Code Division 6, Parts 2.55, 2.6, and 2.8; (B) Identified, evaluated, and commenced implementation, consistent with the implementation schedule set forth in the Plan, of all programs and projects included in the Plan that are locally cost effective and technically feasible which reduce reliance on the Delta; and (C) Included in the Plan, commencing in 2015, the expected outcome for me asurable reduction in Delta reliance and improvement in regional self-reliance. The expected outcome for measurable reduction in Delta reliance and improvement in regional self-reliance shall be reported in the Plan as the reduction in the amount of water used, or in the percentage of water used, from the Delta watershed. For the purposes of reporting, water efficiency is considered a new source of water supply, consistent with Water Code section 1011(a).

Page 567 of 632 ends

Section 2

REDUCED RELIANCE ANALYSIS
Zone 7 Water Agency
Reduce Reliance on the Delta
2 DRAFT | April 2026
The analysis and documentation provided below include all of the elements described in WR P1(c)(1) that need to be included in a water supplier’s UWMP to support a certification of consistency for a future covered action. Including this document as an appendix in the 2015 and subsequent Urban Water Management Plans fulfills the requirements of WR P1 subsection (c)(1) Paragraph A. 2 REDUCED RELIANCE ANALYSIS
The data used in this analysis represent the regional efforts of Zone 7 to serve its customers in the Tri- Valley, including municipal and industrial (M&I) reta ilers (California Water Service, Dublin San Ramon Services District, City of Livermore, and City of Pleasanton), M&I direct retail customers, and untreated water customers. The analysis was coordinated with Zone 7’s retailers as part of the UWMP coordination process as described in the 2025 UWMP. In accordan ce with UMWP requirements, Zone 7’s retailers report their demand and supply data for their respective service areas in their respective UWMPs. This appendix reports demands on Zone 7 and supplies served by Zone 7. The retailers report their other sources of supplies used to supplement Zone 7 supplies in their UWMPs as applicable (e.g., recycled water, groundwater pumped by the retailer). Zone 7 provided the info presented here to the retailers so they can appropriately represent the nature of their wholesale supplies from Zone 7, and those supplies’ contributions to reduced Delta reliance.

The methodology used to determine Zone 7’s reduced Delta reliance and improved regional self-reliance is consistent with the approach detailed in Appendi x C of Department of Water Resources’ (DWR) Urban Water Management Plan Guidebook 2025 (Guidebook Appendix C) issued in January 2026, including the use of narrative justifications for the accounting of supplies and the documentation of specific data sources. General assumptions include:
• All data were obtained from the current 2025 UWMP or previously adopted UWMPs and represent average or normal water year conditions.
• All analyses were conducted at the wholesale level, focusing on Zone 7’s demands and sources of supplies served to the Tri-Valley.
• As described in Chapter 6 of the 2025 UWMP, Zo ne 7 is currently pursuing a number of water supply and storage alternatives to bolster water sy stem reliability while reducing reliance on the Delta. The future projects described in Chapter 6 and the demand management measures described in Chapter 9 fulfill the requirements of WR P1 subsection (c)(1) Paragraph B. For the purposes of the 2025 UWMP, a representative future water supply portfolio was selected; that portfolio is reflected in this analysis.

Tables 1 through 4 present the analysis of Zone 7’s reduced Delta reliance using DWR’s spreadsheet tool and fulfill the requirements of WR P1 subsection (c)(1 ) Paragraph C. Descriptions of the various inputs of the analysis are provided below:
• Baseline (2010) and 2015-2050 Conditions – The analysis uses a normal water year representation of 2010 as the baseline, which is consistent with the approach described in DWR’s Guidebook. Data for the 2010 baseline were taken from the 2010 UWMP (Table 9-11). To evaluate conditions relative to the baseline, actual conditions for 2015, 2020, and 2025 from Table 4-1 of the corresponding UWMPs are presented. Normal year projections for 2030 through 2050 from the 2025 UWMP are then subsequently used. In its 2025 UWMP, Zone 7 does not include operational storage—groundwater recharge a nd State Water Project (SWP) carryover—in its current or projected demands. To maintain consistency with base line and 2015 conditions, operational storage has been added to actu al (2025) and projected (2030-2050) demands presented in Zone 7’s 2025 UWMP.
• Service Area Water Demands with Wa ter Use Efficiency Accounted For – These values reflect Zone 7’s actual and projected water use, including water placed in storage as applicable.

Page 568 of 632 ends

Section 2

REDUCED RELIANCE ANALYSIS
Zone 7 Water Agency
Reduce Reliance on the Delta
3 DRAFT | April 2026
• Non-Potable Water Demands – This item includes untreated water demands, raw water losses, and water placed in storage.
• Water Supplies Contributing to Regional Self-Reliance — Water Use Efficiency – This amount is calculated by DWR’s spreadsheet tool based on Zone 7’s baseline demand, actual demands, and expected future demands. The value shown is the reduction in per capita wate r demand from the baseline (2010) multiplied by the projected population for each. Because the Tri-Valley has successfully reduced potable water demands over time, conserved water is contributing significantly to Zone 7’s regional self-reliance.
— Conjunctive Use Projects – Zone 7’s use of operational storage in the Main Basin is included here. The Main Basin is recharged with SWP water and local Arroyo Valle water.

This water is locally available for use during normal operations, drought, and emergencies.
— Local and Regional Water Supply and Storage Projects – This includes actual use and future projected use of local Arroyo Valle water.
— Other Programs and Projects that Contribute to Regional Self-Reliance – As discussed in Chapter 6 of the 2025 UWMP, Zone 7 has in cluded Sites Reservoi r (2,185 acre-feet per year [AFY] of average yield) as a representative future supply. As stated in a letter from the Delta Stewardship Council to the Site s Project Authority on May 2, 2018, “Sites Reservoir would be located upstream from the Delta, outside the legal Delta boundary” and “does not meet the definition of a covered action”; consequently, Sites Reservoir has been categorized as a water supply contributing to regional self-reliance. • Water Supplies from the Delta Watershed
— CVP/SWP Contract Supplies – Zone 7 derives a large portion of its supplies from the SWP system, as reflected in the analysis.
— Other Water Supplies from the Delta Watershed – SWP carryover water and actual recovered water from the Kern County groundwater banks delivered through the Delta have been included here. Note that future projections do not include water from the banks because that supply is not part of normal year operations.

Page 569 of 632 ends

Section 2

REDUCED RELIANCE ANALYSIS
Z o n e 7 W a t e r A g e n c y
Reduce Reliance on the Delta
4 DRAFT | April 2026
Table 1 Optional Calculation of Water Use Efficiency (DWR Table C-1) Service Area Water Use
Efficiency Demands
(Acre-Feet)
Baseline
(2010)
2015 2020 2025 2030 2035 2040 2045 2050
(Optional)
Service Area Water Demands
with Water Use Efficiency
Accounted For
66,200
47,900 55,040 56,000 71,500 86,300 89,300 91,100 91,000 Non-Potable Water Demands 20,000 22,500 16,110 21,470 35,100 47,100 48,100 48,100 48,100 Potable Service Area Demands
with Water Use Efficiency
Accounted For
46,200 25,400 38,930 34,530 36,400 39,200 41,200 43,000 42,900

Total Service Area Population Baseline
(2010)
2015 2020 2025 2030 2035 2040 2045 2050
(Optional)
Service Area Population 216,000 238,600 265,811 267,000 288,000 310,000 330,000 339,000 341,000

Water Use Efficiency Since
Baseline
(Acre-Feet)
Baseline
(2010)
2015 2020 2025 2030 2035 2040 2045 2050
(Optional)
Per Capita Water Use (GPCD) 191 95 131 115 113 113 111 113 112 Change in Per Capita Water
Use from Baseline (GPCD)
(96) (60) (75) (78) (78) (79) (78) (79)
Estimated Water Use
Efficiency Since Baseline
25,634 17,924 22,578 25,200 27,106 29,383 29,508 30,036

Page 570 of 632 ends

Section 2

REDUCED RELIANCE ANALYSIS
Z o n e 7 W a t e r A g e n c y
Reduce Reliance on the Delta
5 DRAFT | April 2026
Table 2 Calculation of Service Area Water Dema nds Without Water Use Efficiency (DWR Table C-2) Total Service Area Water
Demands
(Acre-Feet)
Baseline
(2010)
2015 2020 2025 2030 2035 2040 2045 2050
(Optional)
Service Area Water Demands
with Water Use Efficiency
Accounted For
66,200
47,900 55,040 56,000 71,500 86,300 89,300 91,100 91,000 Reported Water Use Efficiency
or Estimated Water Use
Efficiency Since Baseline

25,634 17,924 22,578 25,200 27,106 29,383 29,508 30,036 Service Area Water Demands
without Water Use Efficiency
Accounted For
66,200 73,534 72,964 78,578 96,700 113,406 118,683 120,608 121,036

Page 571 of 632 ends

Section 2

REDUCED RELIANCE ANALYSIS
Z o n e 7 W a t e r A g e n c y
Reduce Reliance on the Delta
6 DRAFT | April 2026
Table 3 Calculation of Supplies Contributing to Regional Self-Reliance (DWR Table C-3) Water Supplies Contributing
to Regional Self-Reliance
(Acre-Feet)
Baseline
(2010)
2015 2020 2025 2030 2035 2040 2045 2050
(Optional)
Water Use Efficiency - 25,634 17,924 22,578 25,200 27,106 29,383 29,508 30,036 Water Recycling
Stormwater Capture and Use
Advanced Water Technologies
Conjunctive Use Projects 9,200 2,000 12,000 7,520 20,000 30,000 30,000 30,000 30,000 Local and Regional Water
Supply and Storage Projects 7,100 2,860 8,700 8,000 4,000 4,000 4,000 4,000 4,000 Other Programs and Projects
that Contribute to Regional
Self-Reliance
2,185 2,185 2,185 2,185 2,185
Water Supplies Contributing
to Regional Self-Reliance 16,300 30,494 38,624 38,098 51,385 63,291 65,568 65,693 66,221

Service Area Water Demands
without Water Use Efficiency
(Acre-Feet)
Baseline
(2010)
2015 2020 2025 2030 2035 2040 2045 2050
(Optional)
Service Area Water Demands
without Water Use Efficiency
Accounted For
66,200 73,534 72,964 78,578 96,700 113,406 118,683 120,608 121,036

Change in Regional Self
Reliance
(Acre-Feet)
Baseline
(2010)
2015 2020 2025 2030 2035 2040 2045 2050
(Optional)
Water Supplies Contributing
to Regional Self-Reliance
16,300 30,494 38,624 38,098 51,385 63,291 65,568 65,693 66,221 Change in Water Supplies
Contributing to Regional Self-
Reliance
14,194 22,324 21,798 35,085 46,991 49,268 49,393 49,921

Page 572 of 632 ends

Section 2

REDUCED RELIANCE ANALYSIS
Z o n e 7 W a t e r A g e n c y
Reduce Reliance on the Delta
7 DRAFT | April 2026

Percent Change in Regional
Self Reliance
(As Percent of Demand w/out
WUE)
Baseline
(2010)
2015 2020 2025 2030 2035 2040 2045 2050
(Optional)
Percent of Water Supplies
Contributing to Regional Self-
Reliance

24.6% 41.5% 52.9% 48.5% 53.1% 55.8% 55.2% 54.5% 54.7%
Change in Percent of
Water Supplies Contributing
to Regional Self-Reliance

16.8% 28.3% 23.9% 28.5% 31.2% 30.6% 29.8% 30.1%

Page 573 of 632 ends

Section 2

REDUCED RELIANCE ANALYSIS
Z o n e 7 W a t e r A g e n c y
Reduce Reliance on the Delta
8 DRAFT | April 2026
Table 4 Calculation of Reliance on Water Suppli es from the Delta Watershed (DWR Table C-4) Water Supplies from the
Delta Watershed
(Acre-Feet)
Baseline
(2010)
2015 2020 2025 2030 2035 2040 2045 2050
(Optional)
CVP/SWP Contract Supplies 51,400 16,100 16,100 26,320 36,574 36,574 36,574 36,574 36,574 Delta/Delta Tributary
Diversions

Transfers and Exchanges 4,645 380 7,100 - - - - - -
Other Water Supplies from
the Delta Watershed
26,560 11,800 9,160 7,000 9,000 10,000 10,000 10,000
Total Water Supplies from the
Delta Watershed 56,045 43,040 35,000 35,480 43,574 45,574 46,574 46,574 46,574

Service Area Water Demands
without Water Use Efficiency
(Acre-Feet)
Baseline
(2010)
2015 2020 2025 2030 2035 2040 2045 2050
(Optional)
Service Area Water Demands
without Water Use Efficiency
Accounted For
66,200 73,534 72,964 78,578 96,700 113,406 118,683 120,608 121,036

Change in Supplies from the
Delta Watershed
(Acre-Feet)
Baseline
(2010)
2015 2020 2025 2030 2035 2040 2045 2050
(Optional)
Water Supplies from the Delta
Watershed
56,045 43,040 35,000 35,480 43,574 45,574 46,574 46,574 46,574 Change in Water Supplies
from the Delta Watershed
(13,005) (21,045) (20,565) (12,471) (10,471) (9,471) (9,471) (9,471)

Page 574 of 632 ends

Section 2

REDUCED RELIANCE ANALYSIS
Z o n e 7 W a t e r A g e n c y
Reduce Reliance on the Delta
9 DRAFT | April 2026

Percent Change in Supplies
from the Delta Watershed
(As a Percent of Demand
w/out WUE)
Baseline
(2010)
2015 2020 2025 2030 2035 2040 2045 2050
(Optional)
Percent of Water Supplies
from the Delta Watershed

84.7% 58.5% 48.0% 45.2% 45.1% 40.2% 39.2% 38.6% 38.5%
Change in Percent of Water
Supplies from the Delta
Watershed
-26.1% -36.7% -39.5% -39.6% -44.5% -45.4% -46.0% -46.2%

Page 575 of 632 ends

Section 3

EXPECTED OUTCOMES FOR REDUCED RELIANCE ON THE DELTA
Zone 7 Water Agency
Reduce Reliance on the Delta
10 DRAFT | April 2026
3 EXPECTED OUTCOMES FOR REDUCED RELIANCE ON THE DELTA
As stated in WR P1(c)(1)(C), th e policy requires that , commencing in 2015, UWMPs include expected outcomes for measurable reduction in Delta reliance a nd improved regional self-reliance. WR P1 further states that those outcomes shall be reported in the UWMP as the reduction in the amount of water used, or in the percentage of water used, from the Delta.

The following provides a summary of the near-term ( 2030) and long-term (2050) expected outcomes for Zone 7’s Delta reliance and regional self-reliance ba sed on the assumptions described in the previous section and DWR’s analysis tool. The results show that Zone 7 is measurably reducing reliance on the Delta and improving regional self-reliance, based on the pe rcentage of Zone 7’s water supplies from the Delta Watershed.

Expected Outcomes for Regional Self-Reliance
 Near-term (2030) – Normal water year regional self-reliance is expected to increase by approximately 35,100 AFY from the 2010 baseline (see Table 3). Conserved water and conjunctive use project water are the major sources of this increase.  Long-term (2050) – Normal water year regional self-reliance is expect ed to increase by approximately 49,900 AFY from the 2010 baseline (see Table 3). Conserved water and conjunctive use project water are major contri butors to this increase, supplemented by Sites Reservoir and local surface water.

Expected Outcomes for Percent of Water Supplies from the Delta Watershed  Near-term (2030) – Normal water year reliance on supplies from the Delta watershed is expected to decrease by 40 percent relative to the 2010 baseline (see Table 4).  Long-term (2050) – Normal water year reliance on supplies from the Delta watershed is expected to decrease by 46 percent relative to the 2010 baseline (see Table 4).

Page 576 of 632 ends

2025 Urban Water Management Plan
City of Pleasanton

APPENDIX D
Water Shortage Contingency Plan

Page 577 of 632 ends

EKI A80038.00 i Public Draft | May 2026

CITY OF PLEASANTON
Water Shortage Contingency Plan

Public Draft | May 2026
EKI C50124.00

EKI ENVIRONMENT & WATER, INC. www.ekiconsult.com
2001 Junipero Serra Blvd, Suite 300 • Daly City, CA 94014 Exhibit B

Page 578 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
i EKI Environment & Water, Inc.

Water Shortage Contingency Plan
City of Pleasanton

TABLE OF CONTENTS
INTRODUCTION ................................................................................................................................. 1 1 WATER SUPPLY RELIABILITY ANALYSIS .................................................................................... 2 2 ANNUAL WATER SUPPLY AND DEMAND ASSESSMENT PROCEDURES ....................................... 3

2.1 Decision-Making Process .................................................................................................... 3

2.2 Data and Methodologies .................................................................................................... 5 3 SIX STANDARD WATER SHORTAGE LEVELS .............................................................................. 6 4 SHORTAGE RESPONSE ACTIONS .............................................................................................. 7

4.1 Supply Augmentation ........................................................................................................ 7

4.2 Demand Reduction ............................................................................................................ 8

4.3 Operational Changes .......................................................................................................... 8

4.4 Additional Mandatory Restrictions ................................................................................... 12

4.5 Emergency Response Plan ................................................................................................ 12

4.5.1 Interrupted Supply from Zone 7 ...................................................................................... 13

4.5.2 Area-Wide Electrical Power Failure ................................................................................. 13

4.6 Seismic Risk Assessment and Mitigation Plan ................................................................... 13 5 COMMUNICATION PROTOCOLS ............................................................................................ 14

5.1 Communication for Foreseeable Events ............................................................................ 14

5.2 Communication for Unforeseeable Events ........................................................................ 15 6 COMPLIANCE AND ENFORCEMENT ....................................................................................... 15 7 LEGAL AUTHORITIES ............................................................................................................. 16

7.1 Declaration of Water Shortage ......................................................................................... 16

7.2 Proclamation of Local Emergency ..................................................................................... 16 8 FINANCIAL CONSEQUENCES OF WSCP ................................................................................... 17

8.1 Financial Impacts and Mitigation Action ........................................................................... 17

8.2 Reporting Cost of Compliance with Excessive Water Use Prohibition during Drought Emergency ....................................................................................................................... 17 9 MONITORING AND REPORTING ............................................................................................ 17 10 WSCP REFINEMENT PROCEDURES ........................................................................................ 17 11 SPECIAL WATER FEATURE DISTINCTION ................................................................................ 18 12 PLAN ADOPTION, SUBMITTAL, AND AVAILABILITY ................................................................ 18

Page 579 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
ii EKI Environment & Water, Inc.

TABLES
Table 1. Schedule of Pleasanton’s AWSDA and Annual Water Shortage Assessment Report Activities ...... 3 Table 2. Schedule of Decision-Making Activities if Water Shortage Condition Exists .................................. 5 Table 3. Cross-reference for Standard vs. Supplier Shortage Levels (DWR Table 8-1) ................................. 7 Table 4. Supply Augmentation and Other Actions (DWR Table 8-2) ............................................................ 8 Table 5. Demand Reduction Actions (DWR Table 8-3) ............................................................................... 10 Table 6. Excess Water Use Penalties ........................................................................................................... 16

ABBREVIATIONS AND ACRONYMS
AFY acre-feet per year
AMI Advanced Metering Infrastructure
AWSDA Annual Water Supply and Demand Assessment
CII commercial, industrial, and institutional
City City of Pleasanton
CWC California Water Code
DRA Drought Reliability Assessment
DSRSD Dublin San Ramon Services District
DWR California Department of Water Resources
FEMA Federal Emergency Management Agency
GPQ Groundwater Pumping Quota
LHMP Local Hazard Mitigation Plan
Livermore City of Livermore
PIO Public Information Officer
Pleasanton City of Pleasanton
PMC Pleasanton Municipal Code
SFPUC San Francisco Public Utilities Commission
SWP State Water Project
UWMP Urban Water Management Plan
Water ERP Water Emergency Response Plan
WARN Water/Wastewater Agency Response Network
WEOC Water Emergency Operations Center
WSCP Water Shortage Contingency Plan
WSR Team Water Shortage Response Team
Zone 7 Zone 7 Water Agency

Page 580 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
1 EKI Environment & Water, Inc.

INTRODUCTION
The City of Pleasanton (Pleasanton or City) has prepared this Water Shortage Contingency Plan (WSCP) in conjunction with the 2025 Urban Water Management Plan (UWMP) per California Water Code (CWC) Section (§) 10632. Water shortages occur whenever the available water supply cannot meet the normally expected customer water use. Water shortages can be attributed to various causes , such as climate change, drought, regulatory action, emergency, and/or catastrophic events. Shortage conditions could occur at any time and may, or may not, be foreseen. The City intends for this WSCP to be dynamic such that it may assess response action effectiveness and adapt to emergencies and catastrophic events.

This WSCP describes Pleasanton’s strategic plan to prepare for and respond to water shortage conditions and to guide the City in preventing water service disruptions. Further, the WSCP aims to ensure adequate supplies of water are available to meet the needs of the public and to further protect public health, safety, and welfare, consistent with Chapter 9.30 of the Pleasanton Municipal Code (PMC). The WSCP is also meant to prevent waste of water, unreasonable use of water, and unreasonable methods of water use.

Engrained in this plan is the City’s acknowledgement of water as a scarce natural resource that requires careful management, not only in times of drought but at all times.

This WSCP provides the following prescriptive elements:
• Water Supply Reliability Analysis (Section 1): Summarizes the City’ s water supply analysis and reliability and identifies the key issues that may trigger a shortage condition. • Annual Water Supply and Demand Assessment (AWSDA) Procedures (Section 2): Describes the key data inputs, evaluation criteria, and methodology for assessing the system’s reliability for the coming year and the steps to formally declare any water shortage levels and response actions. • Six Standard Shortage Levels (Section 3): Establishes water shortage levels to clearly identify and prepare for shortages.
• Shortage Response Actions (Section 4): Describes the response actions that may be implemented or considered for each level to reduce gaps between supply and demand as well as minimize social and economic impacts on the community.
• Communication Protocols (Section 5): Describes communication protocols under each level to ensure customers, the public, and local government agencies are informed of shortage conditions and requirements.
• Compliance and Enforcement (Section 6): Defines compliance and enforcement actions available to administer demand reductions.
• Legal Authorities (Section 7): Lists the legal documents that grant the City the authority to declare a water shortage and implement and enforce response actions. • Financial Consequences of a WSCP (Section 8): Describes the anticipated financial impact of implementing water shortage levels and identifies mitigation strategies to offset financial burdens.
• Monitoring and Reporting (Section 9): Summarizes the monitoring and reporting techniques to evaluate the effectiveness of shortage response actions and overall WSCP implementation.

Results are used to determine if shortage response actions should be adjusted. • WSCP Refinement Procedures (Section 10): Describes the factors that may trigger updates to the WSCP and outlines how to complete an update.

Page 581 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
2 EKI Environment & Water, Inc.
• Special Water Feature Distinction (Section 11): Defines considerations and definitions for water use for decorative features versus pools and spas.

The WSCP has been prepared in general accordance with the format suggested by the California Department of Water Resources (DWR) in the 2025 UWMP Guidebook and incorporates standardized DWR 2025 UWMP tables for WSCPs, consistent with the UWMP Act and CWC §10644(a)(2), which states:
“The plan, or amendments to the plan, submitted to the department … shall include any standardized forms, tables, or displays specified by the department".

In addition, tables and figures beyond DWR’s standard set are included as appropriate to provide further context. To distinguish content related to DWR’s standardized tables, the companion DWR table number is included in table titles throughout the Plan for accessible cross-reference. 1 WATER SUPPLY RELIABILITY ANALYSIS
Per CWC §10635(a-b), as part of UWMPs, every urban water supplier in California is required to assess the reliability of its water service to its customers during normal, dry, and multiple dry water years. Th e assessment compares the total water supply sources available to the supplier with the long -term total projected water use over the next 20 years, in five-year increments, for a normal water year, a single dry water year, and a drought lasting five consecutive water years. Additionally, suppliers are required to address supply risks under a severe near-term drought period (i.e., 2026-2030) as a Drought R eliability Assessment (DRA). Both the near-term DRA and long-term supply reliability assessment consider plausible hydrological and regulatory variability, infrastructure capacity, climate conditions, and other factors that affect water supply and demand.

Sections 6 and 7 of the City’s 2025 UWMP present the City’s water supply sources and reliability, respectively. For potable supply, Pleasanton currently relies exclusively on Zone 7 Water Agency (Zone 7), the Tri-Valley’s regional wholesale water supplier. Thus, the City’s water supply reliability is fundamentally linked to Zone 7’s. For Zone 7, a water shortage condition occurs when the available supply of potable water cannot meet its retailers’ water demands for human consumption, sanitation, fire protection, and other beneficial uses. Besides the City, Zone 7’s retailers include California Water Service -Livermore District, the City of Livermore (Livermore), and Dublin San Ramon Services District (DSRSD).

Zone 7’s 2025 UWMP indicates the ability to meet retailer demands during five -year droughts in 2030, 2035, and 2040. However, beginning in 2045, Zone 7 is projecting a 14% shortfall for the last year of a drought lasting five consecutive water years . Because the City anticipates the ability to access its full groundwater pumping quota (GPQ) of 3,500 acre-feet per year ( AFY) will be restored through the Joint Groundwater Project, the assessment of future water supply reliability assumes that the City will rely upon groundwater to meet 3,500 AFY of its potable demands in each year of a five-year drought through 2045 and that the remaining balance will be met through Zone 7 supply purchases. For the fifth year of a five - year drought in 2045, the projected 14% r eduction in Zone 7 supply availability translates to a 10% shortfall for the City.

The analysis associated with this WSCP was developed in the context of Zone 7’s water supply sources and reliability. In some cases, the City and Zone 7 may be able to foresee a water shortage, but the water shortage may also be caused by an unforeseen sudden or emergency event. Statewide water supply conditions, changes in groundwater levels, and actions by other agencies may impact Zone 7’s available water supply. In general, Zone 7’s water supply conditions may be affected by the following:
• State Water Project (SWP) supply allocations and storage levels; • Vulnerability of the Sacramento-San Joaquin Delta to seismic events, changing environmental and regulatory requirements, and climate change; and

Page 582 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
3 EKI Environment & Water, Inc.
• Salts, nutrients, or contaminants in the groundwater basin. 2 ANNUAL WATER SUPPLY AND DEMAND ASSESSMENT PROCEDURES
Beginning July 1, 2022, CWC §10632.1 requires water suppliers to submit an Annual Water Supply and Demand Assessment (AWSDA) and an Annual Water Shortage Assessment Report to DWR. The AWSDA is used to evaluate near -term water supply reliability for the upcoming fiscal year so that the City can prepare logistically and financially for any anticipated water supply constraints, as well as enact appropriate shortage response actions in a timely manner.

This section provides the procedures for the City to conduct its AWSDA, which will inform the City’s Annual Water Shortage Assessment Report and assist the City with planning for potential water supply shortages, including details of the decision -making process , key data inputs, and the steps the City may take to declare a water shortage emergency based on the level of shortage (Section 3) and implement water shortage response actions (Section 4). Given the City’s reliance on water from Zone 7, the City develops its AWSDA using Zone 7’s “Annual Review of the Sustainable Water Supply Report” (Annual Sustainability Report).

2.1 Decision-Making Process
To consistently produce its AWSDA , the City uses the decision-making process described in this section and may adjust and improve the process as needed.

The City’s Projection Team, consisting of the Utilities Planning Manager and the Assistant Director of Environmental Services and Utilities, is responsible for preparing/approving the City’s AWSDA and Annual Water Shortage Assessment Report and submitting them to DWR by July 1 st of each year. Staff gathers key data inputs and conducts the assessment in accordance with Section 2.2. In April, the Projection Team finalizes the assessment based on Zone 7’s Annual Sustainability Report. The AWSDA and Annual Water Shortage Assessment Report is presented to the Assistant Director of Utilities and Environmental Services, or designee, for review and approval. If the AWSDA concludes that available water supply is sufficient to meet expected demands for the current year and one subsequent dry year, no further action is required.

To conduct the AWSDA and prepare the Annual Water Shortage Assessment Report, the Projection Team follows the schedule of activities shown in Table 1. Due to year-to-year variations in hydrologic conditions, the timeframes shown in the tables are approximate and may be adjusted as needed. The City intends to implement shortage response actions to effectively address anticipated water shortage conditions in a timely manner while complying with the State’s reporting requirements.

Table 1. Schedule of Pleasanton’s AWSDA and Annual Water Shortage Assessment Report Activities Schedule Activities Responsible Party
Late summer -
fall of prior year
Utilities Planning Manager prepares City’s demand estimates for next 5 years for delivery request to Zone 7,considering factors affecting supply as described in Section 2.2.

Projection Team
January Projection Team reviews Zone 7’s response to meet demands based on current year’s conditions. Projection Team
March/April Review Zone 7’s Annual Sustainability Report upon completion. Projection Team April
Based on Zone 7’s Annual Sustainability Report, prepare AWSDA and prepare the Annual Water Shortage Assessment Report with recommendations on water shortage condition determination and response actions. Submit to Assistant Director, or designee, for review.

Projection Team

Page 583 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
4 EKI Environment & Water, Inc.

Table 1. Schedule of Pleasanton’s AWSDA and Annual Water Shortage Assessment Report Activities (Continued)
Schedule Activities Responsible Party
May Review AWSDA and Annual Water Shortage Assessment Report and provide comments as needed. Assistant Director
June Finalize and approve AWSDA and Annual Water Shortage Assessment Report. Projection Team
By July 1 Submit finalized AWSDA and Annual Water Shortage Assessment Report to DWR. Projection Team
If the AWSDA concludes that available supply will not meet expected demands, the Projection Team coordinates with the City’s Environmental Services Manager and Director of Public Works , collectively referred to as the Water Shortage Response Team (WSR Team). The WSR Team presents the finalized assessment to the City Council, along with recommendations on water shortage condition determination and actions. Recommended actions may include declaration of a water shortage emergency, declaration of a water shortage stage, and water shortage actions.

Based on the findings of the AWSDA, the City Council determines if a water shortage condition exists and, if needed, adopts a resolution declaring a water shortage emergency and an associated water shortage stage and authorizing water shortage actions. The WSR Team then prepare s the City’s Annual Water Shortage Assessment Report, incorporating City Council determinations and approved actions. The schedule of decision-making activities is provided in Table 2. The timeframes and activities shown in the table are approximate and may be adjusted as needed.

Page 584 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
5 EKI Environment & Water, Inc.

Table 2. Schedule of Decision-Making Activities if Water Shortage Condition Exists Schedule Activities Responsible
Party
January - March
If a water shortage emergency condition exists, prepare recommendations on water shortage condition determination and action based on AWSDA findings. Prepare resolutions approving determinations and actions.

WSR Team
April
Coordinate with the region’s water service providers, and with Alameda County for the possible proclamation of a local emergency.

WSR Team
1st or 2nd City Council
meeting in May
Present finalized determinations and recommendations, along with resolutions approving determinations and actions. WSR Team 1st or 2nd City Council
meeting in May
Receive presentation of finalized determinations and
recommendations. Make determination of degree of
emergency and act on resolutions that declare a water
shortage emergency condition. Authorize water shortage
response actions for implementation.

City Council
After City Council
meeting
If a water shortage emergency condition is declared,
implement the WSCP (consistent with Pleasanton Municipal Code Chapter 9.30) and the water shortage response actions as approved by the City Council.

WSR Team
May - June Finalize AWSDA and Annual Water Shortage Assessment Report. WSR Team
By July 1 Submit final AWSDA and Annual Water Shortage Assessment Report to DWR. WSR Team

2.2 Data and Methodologies
The State requires that the AWSDA evaluate supplies and demands for, at a minimum, the current year and one subsequent dry year to determine water supply reliability. The City uses planned water supply and demand for the current year and a subsequent dry year for AWSDA reporting. In planning for water supplies, the following factors are considered as applicable and appropriate:

1. Zone 7 water supply availability

2. Hydrological conditions

3. Regulatory conditions

4. Contractual constraints

5. Water quality conditions

6. Groundwater well production limitations

7. Infrastructure capacity constraints or changes

8. Capital improvement project implementation
When describing water supply sources for the AWS DA, the City generally uses Section 6 (Water Supply Characterization) of the 2025 UWMP, including the supply projections. If supply sources and projections differ between the AWSDA and the UWMP, the City provides an explanation for the difference.

Page 585 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
6 EKI Environment & Water, Inc.

The City uses planned unconstrained water demands as input to the AWSDA for the current year and the following one dry year. Unconstrained water demands are customer demands where no water conservation measures are in effect. In planning for water demands, the City considers the following factors, as applicable and appropriate:

1. Weather conditions

2. Water year type

3. Population changes (e.g., due to development projects)

4. Anticipated new demands (e.g., changes to land use)

5. Pending policy changes that may impact demands

6. Infrastructure operations
Similarly, when describing water demands for the AWSDA, the City generally uses Section 4 (Water Use Characterization) of the 2025 UWMP, including the demand projections. If the demand projections differ between the AWSDA and the UWMP, the City provides an explanation for the difference.

In preparing the AWSDA, Pleasanton uses the following assessment methodology and criteria to evaluate the City's water supply reliability for the current year and following one dry year. • The City uses a spreadsheet to plan for current year and future year supply and demands.

Planned supply and demand inputs are entered into the spreadsheet in annual increments. As needed, the increments may be revised to monthly or seasonal periods to more closely evaluate specific conditions and needs.
• Supply and demand are compared to determine the City’s water supply reliability in the current year and the following one dry year. The City’s water supply is deemed reliable if it can meet planned water demands in both the current year and the following dry year. If water supply cannot meet planned water demands in the current year or the following dry year, the extent of the water shortage condition is determined, and the City prepares response actions in accordance with this WSCP.
• Findings from the AWSDA are presented to City Council for consideration, along with recommendations for action.
3 SIX STANDARD WATER SHORTAGE LEVELS
To provide a consistent regional and statewide approach for conveying the relative severity of water supply shortage conditions, the State has established six standard water shortage levels that correspond to progressive reductions of up to 10, 20, 30, 40, 50%, and greater than 50% from the normal reliability condition. Each shortage condition should correspond to additional actions water suppliers would implement to meet the severity of the impending shortages.

A water supplier may use its own shortage levels if a crosswalk is included relating its existing shortage levels to the six standard levels ; however, the City’s stages align with the State’s, as described in P MC §9.30.060 and as indicated in Table 3.

Page 586 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
7 EKI Environment & Water, Inc.

Table 3. Cross-reference for Standard vs. Supplier Shortage Levels (DWR Table 8-1) ☒ Check the box if the Supplier uses the Standard six levels of water shortage. Proceed to the next table.

Standard Shortage
Levels
Percent Shortage
Range
Supplier’s Shortage
Levels
Percent
Shortage Range
1 Up to 10% 1 Up to 10%
2 Up to 20% 2 Up to 20%
3 Up to 30% 3 Up to 30%
4 Up to 40% 4 Up to 40%
5 Up to 50% 5 Up to 50%
6 >50% 6 >50%
PMC Chapter 9.30 includes stages that call for voluntary and/or mandatory water conservation to “reduce the consumption of water over an extended period of time, thereby extending the available water required for the city's customers while reducing the hardship to the greatest extent possible on or to the city and on or to the general public.” Stages of action are dependent on the total amount of water supplied to the city by Zone 7 and the amount of water the City can pump out of the groundwater basin from its own wells.
4 SHORTAGE RESPONSE ACTIONS
CWC §10632 (a)(4) requires shortage response actions that align with the defined shortage levels.

Pleasanton’s shortage response actions consist of a combination of demand reduction, supply augmentation, and operational changes. The specific suite of response actions implemented depends on the event that precipitates a water shortage stage, the time of the year the event occurs, the water supply sources available, and the condition of the City’s water system infrastructure. For each response action, the City has estimated the extent to which the action will reduce the gap between supply and demand.

The City tracks progress toward water use reduction goals during drought by comparing monthly water production for the same month in the most recent non -drought year to obtain a percent reduction. The City will increase or decrease its public outreach efforts based on observed use reduction . The City considers shortage response actions as tools for responding to water shortage conditions.

4.1 Supply Augmentation
The City’s normal supply portfolio remains purchased treated water from Zone 7 and local groundwater.

During shortages, the City coordinates with Zone 7 on supply conditions and under extreme shortage conditions, may request to expand its GPQ from Zone 7, as indicated in Table 4.

Page 587 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
8 EKI Environment & Water, Inc.

Table 4. Supply Augmentation and Other Actions (DWR Table 8-2) Yes Is the Supplier completing this table using the standard six levels? (yes/no) Shortage
Level
Supply Augmentation
Methods and Other
Actions
How much is this going to
reduce the shortage gap? Additional Explanation or Reference (Optional) Volume or
Percentage
Shortage Gap
Reduction Value
1 No action taken
2 No action taken
3 No action taken
4 No action taken
5 No action taken
6 Stored emergency
supply
Up to the shortage
gap
Request for the expansion of GPQ
from Zone 7.

4.2 Demand Reduction
The City may request that its customers reduce their water demands in response to any water shortage stage through PMC §9.30. 080. During water shortage conditions, the City plans to reduce demand by implementing these actions, shown in Table 5. The table organizes demand reduction actions by water shortage stage (only in the stage when first implemented, as the City will continue to use these actions in higher stages unless otherwise noted). For each demand reduction action, the table identifies the estimated shortage gap re duction associated with implementing the action and indicates whether the City uses compliance actions such as penalties, charges, or other enforcement.

4.3 Operational Changes
During shortage conditions, system operations may be adjusted to optimize use of available supplies and further reduce demand. Examples of operational changes that the City may implement during a water shortage include:
• More frequent monitoring of water meters and customer water usage • Decreasing line flushing
• Expanding a public education campaign
• Increasing water waste patrols and enforcement
Some of these measures are also included above in Table 5 as they would either directly or indirectly reduce demand.

For a specific emergency event, the City can adjust water operations staff schedules such that rotating shifts cover the duration of the emergency if necessary. The City also has emergency interties with DSRSD

Page 588 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
9 EKI Environment & Water, Inc.
and Livermore that can be activated in the event of a local water shortage. However, like the City, DSRSD and Livermore are also reliant on Zone 7 for potable supply.

Page 589 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
10 EKI Environment & Water, Inc.

Table 5. Demand Reduction Actions (DWR Table 8-3)
Yes Is the Supplier completing this table using the standard six levels? (yes/no) Shortage
Level Demand Reduction Actions
How much is this going to reduce the
shortage gap? Additional Explanation or Reference
(OPTIONAL)
Penalty, Charge,
or Other
Enforcement? Volume or Percentage Shortage Gap
Reduction Value
1 Landscape - Restrict or prohibit runoff from landscape irrigation Percentage 15-20% PMC §9.30.080 A.1, 2, 6, 9, 10, 13. - Prohibit Irrigation with Potable Water in a Manner that causes Runoff (including prohibition of irrigation outside of the hours 9pm - 6 am or during and 48 hours after measurable rainfall) No 1 Other - Prohibit use of potable water for washing hard surfaces Percentage <1% PMC §9.30.080 A.3. - Prohibit Use of Potable Water to Wash Sidewalks and Driveways; Prohibit the Use of Potable Water for Street Washing No
1 Other - Require automatic shut of hoses Percentage <1% PMC §9.30.080 A.4. - Require Shut-Off Nozzles on Hoses for Vehicle Washing No 1 Other - Customers must repair leaks, breaks, and malfunctions in a timely manner Percentage <1% PMC §9.30.080 A.5. - Require Repair of all Leaks within 24 hours No 1 Commercial, Industrial, and Institutional (CII) - Restaurants may only serve water upon request Percentage <1% PMC §9.30.080 A.7. - Prohibit Serving Drinking Water other than upon Request in Eating or Drinking Establishments No 1 CII - Lodging establishment must offer opt out of linen service Percentage <1% PMC §9.30.080 A.8. - Provide Linen Service Opt-Out Options No 1 Pools and Spas - Require covers for pools and spas Percentage <1% PMC §9.30.080 A.11. - Require Pool Covers No 1 Water Features - Restrict water use for decorative water features, such as fountains Percentage <1% PMC §9.30.080 A.12. - Prohibit Potable Water Use for Decorative Water Features that do not Recirculate Water No 1 Expand Public Information Campaign Percentage
<1% Agency Action - Gardening Workshops; Establish Drought Hotline; School Education Program; Media Campaign, Newspaper Articles, Website; Promote Water Conservation / Rebate Programs; Water Efficiency Workshops, Public Events; Water Bill Inserts; Home or Mobile Water Use Reports No
1 Adjust Customer Billing Percentage <1% Agency Action - Move to Monthly Metering / Billing No 1 Reduce System Water Loss Percentage 0-2% Agency Action - Reduce Distribution System Pressures; Promote / Expand Use of Recycled Water; Audit and Reduce System Water Loss; Establish Retrofit on Resale Ordinance No 2 Landscape - Other landscape restriction or prohibition Percentage <1% PMC §9.30.080 B.2. - Outdoor irrigation of lawn and ornamental landscaping limits (one day / week November- February; no more than three non-consecutive days per week March-October). Yes 2 Expand Public Information Campaign (Enhanced) Percentage <1% PMC §9.30.080 B.3. & Agency Action - Commercial customer requirements for conservation messaging and expanded public education program No
2 Other - Prohibit use of potable water for construction activities Percentage <1% PMC §9.30.080 A.4. - Prohibit use of potable water for construction activities No 3 Landscape - Limit landscape irrigation to specific days Percentage 0-5% PMC §9.30.080 C.2. - Outdoor irrigation of lawn and ornamental landscaping shall be limited to one day per week November through February, and no more than two non-consecutive days per week March through October. Yes

Page 590 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
11 EKI Environment & Water, Inc.

Yes Is the Supplier completing this table using the standard six levels? (yes/no) Shortage
Level Demand Reduction Actions
How much is this going to reduce the
shortage gap? Additional Explanation or Reference
(OPTIONAL)
Penalty, Charge,
or Other
Enforcement? Volume or Percentage Shortage Gap
Reduction Value
3 CII - Commercial kitchens required to use pre-rinse spray valves Percentage <1% PMC §9.30.080 C.3. - Restaurant kitchens shall be equipped with low-flow rinse nozzles. Yes 3 Decrease Line Flushing Percentage <1% Agency Action - Decrease Frequency and Length of Line Flushing Yes 3 Implement or Modify Drought Rate Structure or Surcharge Percentage 0-5% Agency Action - Implement Drought Rate Structure Yes 4 Other - Prohibit vehicle washing except at facilities using recycled or recirculating water Percentage <1% PMC §9.30.080 D.2. - Prohibit Vehicle Washing Except with Recycled Water; Wash Car at Facility that Recycles the Water Yes
4 Landscape - Limit landscape irrigation to specific days Percentage 0-5% PMC §9.30.080 D.3. - Outdoor watering restrictions for all customers. Single-family residential: hand-watering using a hose with a positive shut-off nozzle, drip, or subsurface irrigation on two non-consecutive days per week. All other customers (excluding certain industries): hand-watering using a hose with a positive shut-off nozzle, drip, or subsurface irrigation to two non-consecutive weekdays; specified as Mondays and Thursdays. Commercial nurseries, public sports fields, golf courses, and other water dependent industries: as approved by the Agency Director.

Yes
4 Offer Water Use Surveys Percentage <1% Agency Action - Conduct CII Surveys Targeting High Water Users; Conduct Irrigation Account Surveys; Conduct Water Use Surveys Targeting High Water Users Yes
5 Other water feature or swimming pool restriction Percentage <1% PMC §9.30.080 E.2. - Prohibit Filling of Pools Yes 5 Landscape - Prohibit certain types of landscape irrigation Percentage <1% PMC §9.30.080 E.3. - Prohibit use of potable water for decorative ponds, basins, lakes, waterways, and fountains. Yes 6 Landscape - Prohibit certain types of landscape irrigation Percentage 0-5% The irrigation of turf or lawn using potable water is prohibited. All water customers, with the exception of commercial nurseries, golf courses, sport fields, and other water dependent industries, shall be limited in the use of all other non-lawn area watering to hand-watering from a container of less than five-gallon capacity on no more than two days per week. The aforementioned water dependent industries shall work with city staff under the direction of the director to develop an approved irrigation schedule.

Yes
6 Other Percentage <1% Laundromats are prohibited from using non-efficient washing machines. No NOTES:

Actions listed in PMC §9.30.800 are listed by the closest available demand reduction action in the DWR reporting table dropdown list.

Page 591 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
12 EKI Environment & Water, Inc.

4.4 Additional Mandatory Restrictions
The City defines wasteful water use as a violation of water service and enforces the restrictions listed below under PMC §14.04.060 and related code provisions. The City’s current definitions of wasteful water include:

1. Use of potable water between 9:00 a.m. and 6:00 p.m. to irrigate grass, lawns, groundcover, shrubbery, crops, vegetation, and trees, with the exception of hand watering and drip irrigation.

2. The application of potable water to outdoor landscaping in a manner that causes runoff such that water flows onto adjacent property, non-irrigated areas, private and public walkways, roadways, and/or parking lots or structures.

3. Use of potable water to irrigate outdoor landscaping during and within 48 hours after measurable rainfall.

4. Use of potable water to wash down sidewalks, walkways, driveways, parking lots, open ground or other hard surface areas by the direct application of water thereto, unless needed for health or safety reasons.

5. Use of potable water in non-recirculating decorative ponds, fountains and other water features, with the exception of child water-play features.

6. Allowing potable water to escape from breaks within the person or consumer’s plumbing system for more than eight hours after the person or consumer is notified or discovers the break.

7. Use of potable water for outdoor landscaping through a dedicated irrigation meter within the city’s recycled water use area unless exempted by the director of operations and water utilities for existing water customers, or city engineer for new development.

8. Any use of potable water in violation of the CWC, including, but not limited to, the use of potable water on non-functional turf.

4.5 Emergency Response Plan
The shortage stages in Table 3 apply to both foreseeable and unforeseeable water supply shortage conditions. For catastrophic events, the City will implement the Water Emergency Response Plan (ERP) and coordinate emergency declarations and response actions with City leadership and Zone 7.

The City’s Water ERP specifies that the City Council, the Director of Emergency Services (City Manager), and the Director of Public Works have the authority to proclaim a Local Water Emergency. In a water emergency, the City would activate a Water Emergency Operations Center (WEOC), with partial or full staffing dependent on the magnitude of the event. WEOC and other emergency support staff and departments would typically work under the direction of the Director of Emergency Services (i.e., the City Manager). As defined in the City’s Water Management Plan, if there were a major failure of supply, storage or facility distribution, a declaration of mandatory water use restrictions would be necessary in designated affected areas (expected reduction would vary in response to the specific situation).

The City will also follow the lead of Zone 7, or the State of California, during a major catastrophe or drought period. When Zone 7 announces a curtailment in water deliveries, the City will assess the impact on the City supplies and determine its water sh ortage level. The City will monitor the situation closely, both from a supply and demand perspective, and carefully select the appropriate shortage response actions to close the gap between anticipated supplies and demand. The City will move from one stage to the next if the situation worsens and will reduce restrictions when it subsides. To provide supplies during

Page 592 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
13 EKI Environment & Water, Inc.
an emergency, the City has two interties with DSRSD and one intertie with Livermore. Per agreements with DSRSD and Livermore made in 1996 and 2011, respectively, the City can receive from each agency a reasonable quantity of water required during the emergency.

The City has mutual aid agreements with the San Francisco Public Utilities Commission (SFPUC), Livermore, DSRSD, and Zone 7. The City also participates in the Water/Wastewater Agency Response Network (WARN), a statewide public utility mutual assistance organization . After exhausting its own resources, the City can call on these neighboring agencies for aid.

4.5.1 Interrupted Supply from Zone 7
If imported deliveries are interrupted, the City will coordinate with Zone 7 on available groundwater and stored supplies and implement applicable shortage stage actions immediately.

Zone 7 has emergency generators (both portable and dedicated) at strategic locations in preparation for a regional power outage. These generators would allow both the Del Valle Water Treatment Plant and the Patterson Pass Water Treatment Plant to continue operating even under a power outage. Assuming no interruptions in surface water supply, Zone 7 would be able to provide continued service to all treated water contractors. If necessary to meet demand, Zone 7 would also operate groundwater wells, which have either a dedicated generator in place or have the necessary hook -ups to receive power from a portable generator. If the power failure were to occur during the high -demand summer season, Zone 7 may be unable to meet hourly peak demands throughout the trans mission system. Zone 7 would work closely with the City and other retailers to manage demands to minimize impacts.

4.5.1.1 Unavailable SWP Water
Zone 7 , and therefore Pleasanton, relies heavily on the SWP for water supply. If SWP supplies are unavailable, the City will rely on available alternative deliveries and groundwater, evaluate projected deficits, and escalate stage actions as needed.

Under this scenario and under current conditions, Zone 7 estimates that it would be able to make full deliveries to the retailers during non -summer months using a combination of groundwater and water stored in Lake Del Valle. During the peak demand of the summer months, however, Zone 7 will need to reduce deliveries to its retailers, including the City. Zone 7’s analysis shows that Zone 7 has sufficient groundwater supply and pumping ability to serve the indoor water use needs of the service area over a one-year period; the availability of water supply for outdoor water use during the summer months will depend on the amount of water available in Lake Del Valle. Depending on timing and degree of recovery, the City may activate one of the water shortage levels in Section 3.

4.5.1.2 Unavailable Zone 7 Water
If one or more Zone 7 turnouts are unusable, the City will reroute available supplies where feasible and prioritize service reliability while implementing shortage response measures.

4.5.2 Area-Wide Electrical Power Failure
During prolonged power outages, the City will rely on backup power and emergency operations where available, prioritize critical facilities, and maintain shortage response messaging. Additionally, the City could receive water from emergency interties with DSRSD and Livermore if necessary.

4.6 Seismic Risk Assessment and Mitigation Plan
CWC §10632.5(a) requires that UWMPs assess seismic risk and include a mitigation plan for the water system’s seismic vulnerabilities and allows for incorporating a Local Hazard Mitigation Plan (LHMP) to meet this requirement, if the LHMP addresses seismic risk. Along with DSRSD and the cities of Dublin and

Page 593 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
14 EKI Environment & Water, Inc.

Livermore, Pleasanton participated in development of the 2024 Tri-Valley LHMP Update (2024 LHMP), which addresses seismic risk . This WSCP incorporates th e 2024 LHMP by reference. The Federal Emergency Management Agency (FEMA) approved the 2024 LHMP. Direct links to the 2024 LHMP are included below, along with instructions on how to navigate to the 2024 LHMP via Pleasanton’s website. • Direct link – Volume 1 (Planning Area-Wide Elements):
www.livermoreca.gov/home/showpublisheddocument/11608/638544852506600000 • Direct link – Volume 2 (Planning Partner Annexes):
www.livermoreca.gov/home/showpublisheddocument/11610/638544853012730000 • Via Pleasanton’s website (www.cityofpleasantonca.gov) – under the “Government” menu, click on the “Community and Economic Development” department. On the “Community and Economic Development” page, scroll down to the “Codes, Guidelines and Plans” section. The Tri- Valley Hazard Mitigation Plan is listed under the “Specific Plans.” The City’s water facilities, as well as Zone 7’s, have been constructed in accordance with the applicable building codes to minimize potential damage during an earthquake. Additionally, approximately 85 % of the City’s water infrastructure has been earthquake reinforced, and no area within the service area is solely dependent on non -earthquake reinforced infrastructure. The City has multiple turnouts from Zone 7; so, if one is damaged during an earthquake, the City can use the remaining turnouts to continue receiving water supply from Zone 7. Furthermore, the pipelines were built in a looped arterial design to ensure there is more than one route for water flow.
5 COMMUNICATION PROTOCOLS
In the event of a water shortage, the City must inform its customers, the public and interested parties, and local, regional, and state entities. This section addresses c ommunication protocols for foreseeable and unforeseeable events.

5.1 Communication for Foreseeable Events
For foreseeable conditions, the City initiates communication through the AWSDA decision process and City Council stage actions. Messaging includes the declared shortage stage and the required demand reduction actions from Table 5. If a water shortage emergency is anticipated, City staff coordinate interdepartmentally, with the region’s water service providers, and with Alameda County for the possible proclamation of a local emergency.

In a duly noticed meeting, the City Council receive s presentation of the current or predicted shortage as determined by the current AWSDA. The City Council determines if a water shortage emergency condition exists and the degree of the emergency, while considering the shortage response actions triggered or anticipated to be triggered by the shortage level. As necessary, the City Council acts on the water shortage emergency declaration and the associated shortage stage and response actions.

If the City Council declares a water shortage emergency, the Public Information Officer (PIO) and City staff coordinate to communicate with City customers and the public to inform them about the declared water shortage emergency, water shortage level, and authorized water use restrictions. The City may use any combination of the following outreach formats: newspaper publication, mailers, bill stuffers, newsletters, social media, its website, local radio, and press releases.

City staff communicate with the appropriate State agencies regarding the water shortage emergency when needed.

Page 594 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
15 EKI Environment & Water, Inc.

5.2 Communication for Unforeseeable Events
For unforeseeable events such as infrastructure failure or wildfire impacts, communications will follow the Water ERP chain of command and provide frequent updates on service conditions, safety advisories, and stage-based demand reduction requirements.

In general, communications and notifications proceed along the chain of command at the direction of the Director of Emergency Services, with external communications managed by the PIO. The W ater ERP provides a list of relevant contacts for notification at local, regional, and state levels.

The PIO is the official spokesperson for the City and is responsible for establishing an information center and providing information for news media. In addition, the PIO maintains a list of contacts to disseminate information to the public, typically via electronic media, radio, television, or newspapers. 6 COMPLIANCE AND ENFORCEMENT
After City Council adopts a shortage stage, the City enforces applicable demand reduction actions and PMC restrictions through progressive compliance measures. Compliance expectations are communicated with the stage declaration and reinforced through billing notices, outreach, and targeted follow -up for high-use accounts.

When the City enacts mandatory reductions, customers are required to reduce water demands based on past use for the same billing period from the previous one to four years, as data is available. If insufficient historic usage information is available, then the City may base reductions on a combination of available data, per-capita water use targets, water usage from similar customer types, and other activity -specific water usage data. Customers can request adjustments to water use reductions by submitting a written request with supporting documentation within 30 days of receipt of the bill that is the subject of the adjustment request.

Customers exceeding required reductions are subject to excess use penalties and other enforcement actions authorized by City code and adopted schedules, as described in Table 6.

Page 595 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
16 EKI Environment & Water, Inc.

Table 6. Excess Water Use Penalties
Stage Conservation Level
Number of Exceedances Within the Prior 12 Months
Once Two Three Four or more
Stage 1 Up to 10% Voluntary No penalty No penalty No penalty No penalty Stage 2 Up to 20% Voluntary No penalty No penalty No penalty No penalty Stage 2 Up to 20% Mandatory $2.50
additional for
all units
$5 additional
for all units
+ $25
$7.50 additional
for all units
+ $50
$10 additional
for all units
+ $100
Stage 3 Up to 30% Mandatory $4 additional
for all units
+ $50
$8 additional
for all units
+ $100
$12 additional
for all units
+ $250
$16 additional
for all units
+ $500
Stage 4 Up to 40% Mandatory $6 additional
for all units
+ $100
$12 additional
for all units
+ $250
$18 additional
for all units
+ $500
$24 additional
for all units
+ $750
Stage 5 Up to 50% Mandatory $8 additional
for all units
+ $150
$16 additional
for all units
+ $300
$24 additional
for all units
+ $550
$32 additional
for all units
+ $800
Stage 6 More than 50% Mandatory $10 additional
for all units
+ $200
$20 additional
for all units
+ $350
$30 additional
for all units
+ $600
$40 additional
for all units
+ $850
NOTES:
(a) Penalties include a volumetric surcharge per unit of water used (above the mandatory conservation amount) plus a fixed fee.
(b) Penalties are defined per PMC §9.30.100.
7 LEGAL AUTHORITIES
Per PMC Chapter 9.30, Pleasanton has legal authority to declare a water shortage and implement and enforce shortage response actions.

7.1 Declaration of Water Shortage
PMC Chapter 9.30 includes provisions for declaring a water shortage emergency, determining customer use reductions, water use regulations and restrictions, and compliance and enforcement. When a water shortage is determined, the City will coordinate with Zone 7, the region’s other water service providers, and the County for the possible proclamation of a local emergency in accordance with California Government Code, California Emergency Services Act (Article 2, §8558).

7.2 Proclamation of Local Emergency
In a duly noticed meeting, t he Pleasanton’s City Council will determine whether a water shortage emergency condition exists and, if so, the degree of the emergency and what regulations and restrictions should be enforced in response to the shortage. The City shall declare a water shortage emergency in accordance with CWC Division 1, Chapter 3,
§350, which states:
…The governing body of a distributor of a public water supply…shall declare a water shortage emergency condition to prevail within the area served by such distributor whenever it finds and determines that the ordinary demands and requirements of water consumers cannot be satisfied

Page 596 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
17 EKI Environment & Water, Inc.
without depleting the water supply of the distributor to the extent that there would be insufficient water for human consumption, sanitation, and fire protection. 8 FINANCIAL CONSEQUENCES OF WSCP
This section describes the financial impacts of implementing the WSCP and mitigation actions needed to address these impacts.

8.1 Financial Impacts and Mitigation Action
During periods of water shortage and reduced customer consumption, the City anticipates its revenue will decrease due to reduced water demand. Meanwhile, the City anticipates its expenditures will increase due to implementing water conservation measures to cover costs associated with increased customer communication, expanded public outreach campaigns, enforcement staffing, operational adjustments, and program administration. To compensate for lost revenue and increased expenditures, the City may implement drought rates and pass through applicable wholesale shortage surcharges in accordance with adopted fee schedules.

8.2 Reporting Cost of Compliance with Excessive Water Use Prohibition during Drought Emergency
The City complies with CWC §10632 by implementing measures to prohibit excessive water use from customers. The City achieves c ompliance through implementation of its WSCP, PMC Chapter 9.30, and PMC §14.04.060. Costs are primarily related to added administrative tasks and enforcement , which include increased labor and contractor assistance . The total cost of compliance depends on the water shortage level and duration.
9 MONITORING AND REPORTING
From water supply sources to individual customer connections, the City’s water system is fully metered.

City staff can use data from meters to monitor for compliance and report progress . The City’s meters at its water sources (i.e., turnouts from Zone 7 and groundwater production wells ) provide a systemwide overview of water supply and demands. Further, most of the City’s customer accounts are connected to the Advanced Metering Infrastructure (AMI) system that allows for real-time monitoring. Approximately 300 of the City’s customer meters are not connected to AMI due to terrain challenges with connectivity .

The City may use metering information to assess progress in meeting its water shortage response objectives, as part of its meter management program.

During drought, Pleasanton staff compare expected/requested water use reductions to observed savings, track response action implementation, and report results through required monthly and annual reporting processes. City staff use monitoring results to inform recommendations for maintaining, escalating, or de- escalating shortage stages and to refine implementation assumptions for future assessments. 10 WSCP REFINEMENT PROCEDURES
This WSCP is an adaptive plan that is subject to refinements as needed to ensure that the City’s shortage response actions and mitigation strategies are effective and produce the desired results. Based on monitoring described in Section 9 and the need for compliance and enforcement actions described in Section 6, the City may adjust its response actions and modify its WSCP. The City may also seek input from staff and the public regarding the effectiveness of its WSCP and ideas for improvements.

Page 597 of 632 ends

City of Pleasanton | Water Shortage Contingency Plan
Public Draft | May 2026
18 EKI Environment & Water, Inc.

When a revised WSCP is proposed, the revised WSCP will undergo the process described in Section 12 for adoption by City Council and distribution to the County, Zone 7, and the public. 11 SPECIAL WATER FEATURE DISTINCTION
The City distinguishes and regulates special water features (e.g., decorative fountains and ponds ) separately from pools and spas. PMC §9.30.110 prohibits the use of water in non -re-circulatory ponds, fountains, and decorative water features during the time PMC Chapter 9.30 is in effect. 12 PLAN ADOPTION, SUBMITTAL, AND AVAILABILITY
This WSCP is adopted concurrently with the City’s 2025 UWMP, by separate resolution. Prior to adoption, a duly noticed public hearing was conducted. A copy of this WSCP will be submitted to DWR by July 1, 2026.

No later than 30 days after adoption, copies of this WSCP will be available at the City’s Operations Service Center and the Pleasanton Public Library . A copy will also be provided to the County and Zone 7. An electronic copy of this WSCP will also be available for public review and download on the City’s website.

Page 598 of 632 ends

2025 Urban Water Management Plan
City of Pleasanton

APPENDIX E
DERWA Resolution No. 19-3

Page 599 of 632 ends
Page 600 of 632 ends
Page 601 of 632 ends
Page 602 of 632 ends

2025 Urban Water Management Plan
City of Pleasanton

APPENDIX F
Agency and Public Notices

Page 603 of 632 ends

From: Sasha Markham <[email protected]>
Sent: Thursday, January 15, 2026 12:38 PM
To: [email protected]
Cc: Siew-Chin Yeong <[email protected]>; David Bruzzone <[email protected]>; Rita Di Candia <[email protected]>
Subject: Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Notice of Preparation of the 2025 Urban Water Management Plan and Water Shortage Contingency Plan

The City of Pleasanton (City) is currently in the process of preparing its 2025 Urban Water Management Plan (UWMP) and associated Water Shortage Contingency Plan (WSCP) as an update to the City’s 2020 UWMP adopted in June 2021. The UWMP is a planning document that reports, describes, and evaluates water deliveries, uses, conservation efforts, supply sources, and supply reliability. The WSCP defines various stages of water supply shortage based on supply conditions and identifies planned responses for each stage.

The Urban Water Management Planning Act (California Water Code §10608–10656) requires urban water suppliers to prepare and adopt an updated UWMP and accompanying WSCP every five years. All urban water suppliers (either publicly or privately owned) that provide water for municipal purposes (either directly or indirectly) to more than 3,000 customers or supply more than 3,000 acre-feet per year are subject to the Urban Water Management Planning Act. As an urban water supplier, the City is required to submit its 2025 UWMP and WSCP to the California Department of Water Resources (DWR) by July 1, 2026.

Coordination with other water management agencies/suppliers, public agencies (e.g., cities and counties), and community organizations in the region is an integral part of updating the City’s UWMP and WSCP. The City invites your agency’s/organization’s participation in this process. City staff are available to discuss the underlying assumptions used to prepare the plans (e.g., projected water demands, supply availability, and land uses, etc.) and other aspects.

The City will release draft versions of the 2025 UWMP and WSCP for public review and hold public hearings (anticipated in April and May 2026, respectively).

If you wish to contact the City about this review process, you may email staff at: [email protected]

Sincerely,

Sasha Markham
Public Works Department
Administrative Assistant
D: 925-931-5512
C: 925-248-7392
[email protected]
City of Pleasanton | P.O. Box 520, Pleasanton, CA 94566

Page 604 of 632 ends

From: Sasha Markham <[email protected]>
Sent: Thursday, January 15, 2026 12:38 PM
To: [email protected]; 'Steven Delight' <[email protected]> Cc: Siew-Chin Yeong <[email protected]>; David Bruzzone <[email protected]>; Rita Di Candia <[email protected]>
Subject: Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Notice of Preparation of the 2025 Urban Water Management Plan and Water Shortage Contingency Plan

The City of Pleasanton (City) is currently in the process of preparing its 2025 Urban Water Management Plan (UWMP) and associated Water Shortage Contingency Plan (WSCP) as an update to the City’s 2020 UWMP adopted in June 2021. The UWMP is a planning document that reports, describes, and evaluates water deliveries, uses, conservation efforts, supply sources, and supply reliability. The WSCP defines various stages of water supply shortage based on supply conditions and identifies planned responses for each stage.

The Urban Water Management Planning Act (California Water Code §10608–10656) requires urban water suppliers to prepare and adopt an updated UWMP and accompanying WSCP every five years. All urban water suppliers (either publicly or privately owned) that provide water for municipal purposes (either directly or indirectly) to more than 3,000 customers or supply more than 3,000 acre-feet per year are subject to the Urban Water Management Planning Act. As an urban water supplier, the City is required to submit its 2025 UWMP and WSCP to the California Department of Water Resources (DWR) by July 1, 2026.

Coordination with other water management agencies/suppliers, public agencies (e.g., cities and counties), and community organizations in the region is an integral part of updating the City’s UWMP and WSCP. The City invites your agency’s/organization’s participation in this process. City staff are available to discuss the underlying assumptions used to prepare the plans (e.g., projected water demands, supply availability, and land uses, etc.) and other aspects.

The City will release draft versions of the 2025 UWMP and WSCP for public review and hold public hearings (anticipated in April and May 2026, respectively).

If you wish to contact the City about this review process, you may email staff at: [email protected]

Sincerely,

Sasha Markham
Public Works Department
Administrative Assistant
D: 925-931-5512
C: 925-248-7392
[email protected]
City of Pleasanton | P.O. Box 520, Pleasanton, CA 94566

Page 605 of 632 ends

From: Sasha Markham <[email protected]>
Sent: Thursday, January 15, 2026 8:40 AM
To: [email protected]
Cc: Siew-Chin Yeong <[email protected]>; David Bruzzone <[email protected]>; Rita Di Candia <[email protected]>
Subject: Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Notice of Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Dear Mr. Olson,

The City of Pleasanton (City) is currently in the process of preparing its 2025 Urban Water Management Plan (UWMP) and associated Water Shortage Contingency Plan (WSCP) as an update to the City’s 2020 UWMP adopted in June 2021. The UWMP is a planning document that reports, describes, and evaluates water deliveries, uses, conservation efforts, supply sources, and supply reliability. The WSCP defines various stages of water supply shortage based on supply conditions and identifies planned responses for each stage.

The Urban Water Management Planning Act (California Water Code §10608–10656) requires urban water suppliers to prepare and adopt an updated UWMP and accompanying WSCP every five years. All urban water suppliers (either publicly or privately owned) that provide water for municipal purposes (either directly or indirectly) to more than 3,000 customers or supply more than 3,000 acre-feet per year are subject to the Urban Water Management Planning Act. As an urban water supplier, the City is required to submit its 2025 UWMP and WSCP to the California Department of Water Resources (DWR) by July 1, 2026.

Coordination with other water management agencies/suppliers, public agencies (e.g., cities and counties), and community organizations in the region is an integral part of updating the City’s UWMP and WSCP. The City invites your agency’s/organization’s participation in this process. City staff are available to discuss the underlying assumptions used to prepare the plans (e.g., projected water demands, supply availability, and land uses, etc.) and other aspects.

The City will release draft versions of the 2025 UWMP and WSCP for public review and hold public hearings (anticipated in April and May 2026, respectively).

If you wish to contact the City about this review process, you may email staff at: [email protected]

Sincerely,
Sasha Markham
Public Works Department
Administrative Assistant
D: 925-931-5512
C: 925-248-7392
[email protected]
City of Pleasanton | P.O. Box 520, Pleasanton, CA 94566

Page 606 of 632 ends

From: Sasha Markham <[email protected]>
Sent: Thursday, January 15, 2026 8:39 AM
To: [email protected]
Cc: Siew-Chin Yeong <[email protected]>; David Bruzzone <[email protected]>; Rita Di Candia <[email protected]>
Subject: Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Notice of Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Dear Dr. Ghysels,

The City of Pleasanton (City) is currently in the process of preparing its 2025 Urban Water Management Plan (UWMP) and associated Water Shortage Contingency Plan (WSCP) as an update to the City’s 2020 UWMP adopted in June 2021. The UWMP is a planning document that reports, describes, and evaluates water deliveries, uses, conservation efforts, supply sources, and supply reliability. The WSCP defines various stages of water supply shortage based on supply conditions and identifies planned responses for each stage.

The Urban Water Management Planning Act (California Water Code §10608–10656) requires urban water suppliers to prepare and adopt an updated UWMP and accompanying WSCP every five years. All urban water suppliers (either publicly or privately owned) that provide water for municipal purposes (either directly or indirectly) to more than 3,000 customers or supply more than 3,000 acre-feet per year are subject to the Urban Water Management Planning Act. As an urban water supplier, the City is required to submit its 2025 UWMP and WSCP to the California Department of Water Resources (DWR) by July 1, 2026.

Coordination with other water management agencies/suppliers, public agencies (e.g., cities and counties), and community organizations in the region is an integral part of updating the City’s UWMP and WSCP. The City invites your agency’s/organization’s participation in this process. City staff are available to discuss the underlying assumptions used to prepare the plans (e.g., projected water demands, supply availability, and land uses, etc.) and other aspects.

The City will release draft versions of the 2025 UWMP and WSCP for public review and hold public hearings (anticipated in April and May 2026, respectively).

If you wish to contact the City about this review process, you may email staff at: [email protected]

Sincerely,
Sasha Markham
Public Works Department
Administrative Assistant
D: 925-931-5512
C: 925-248-7392
[email protected]
City of Pleasanton | P.O. Box 520, Pleasanton, CA 94566

Page 607 of 632 ends

From: Sasha Markham <[email protected]>
Sent: Thursday, January 15, 2026 8:39 AM
To: [email protected]
Cc: Siew-Chin Yeong <[email protected]>; David Bruzzone <[email protected]>; Rita Di Candia <[email protected]>
Subject: Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Notice of Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Dear Mr. Ritchie,

The City of Pleasanton (City) is currently in the process of preparing its 2025 Urban Water Management Plan (UWMP) and associated Water Shortage Contingency Plan (WSCP) as an update to the City’s 2020 UWMP adopted in June 2021. The UWMP is a planning document that reports, describes, and evaluates water deliveries, uses, conservation efforts, supply sources, and supply reliability. The WSCP defines various stages of water supply shortage based on supply conditions and identifies planned responses for each stage.

The Urban Water Management Planning Act (California Water Code §10608–10656) requires urban water suppliers to prepare and adopt an updated UWMP and accompanying WSCP every five years. All urban water suppliers (either publicly or privately owned) that provide water for municipal purposes (either directly or indirectly) to more than 3,000 customers or supply more than 3,000 acre-feet per year are subject to the Urban Water Management Planning Act. As an urban water supplier, the City is required to submit its 2025 UWMP and WSCP to the California Department of Water Resources (DWR) by July 1, 2026.

Coordination with other water management agencies/suppliers, public agencies (e.g., cities and counties), and community organizations in the region is an integral part of updating the City’s UWMP and WSCP. The City invites your agency’s/organization’s participation in this process. City staff are available to discuss the underlying assumptions used to prepare the plans (e.g., projected water demands, supply availability, and land uses, etc.) and other aspects.

The City will release draft versions of the 2025 UWMP and WSCP for public review and hold public hearings (anticipated in April and May 2026, respectively).

If you wish to contact the City about this review process, you may email staff at: [email protected]

Sincerely,
Sasha Markham
Public Works Department
Administrative Assistant
D: 925-931-5512
C: 925-248-7392
[email protected]
City of Pleasanton | P.O. Box 520, Pleasanton, CA 94566

Page 608 of 632 ends

From: Sasha Markham <[email protected]>
Sent: Thursday, January 15, 2026 8:38 AM
To: [email protected]
Cc: Siew-Chin Yeong <[email protected]>; David Bruzzone <[email protected]>; Rita Di Candia <[email protected]>
Subject: Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Notice of Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Dear Mr. Freeman,

The City of Pleasanton (City) is currently in the process of preparing its 2025 Urban Water Management Plan (UWMP) and associated Water Shortage Contingency Plan (WSCP) as an update to the City’s 2020 UWMP adopted in June 2021. The UWMP is a planning document that reports, describes, and evaluates water deliveries, uses, conservation efforts, supply sources, and supply reliability. The WSCP defines various stages of water supply shortage based on supply conditions and identifies planned responses for each stage.

The Urban Water Management Planning Act (California Water Code §10608–10656) requires urban water suppliers to prepare and adopt an updated UWMP and accompanying WSCP every five years. All urban water suppliers (either publicly or privately owned) that provide water for municipal purposes (either directly or indirectly) to more than 3,000 customers or supply more than 3,000 acre-feet per year are subject to the Urban Water Management Planning Act. As an urban water supplier, the City is required to submit its 2025 UWMP and WSCP to the California Department of Water Resources (DWR) by July 1, 2026.

Coordination with other water management agencies/suppliers, public agencies (e.g., cities and counties), and community organizations in the region is an integral part of updating the City’s UWMP and WSCP. The City invites your agency’s/organization’s participation in this process. City staff are available to discuss the underlying assumptions used to prepare the plans (e.g., projected water demands, supply availability, and land uses, etc.) and other aspects.

The City will release draft versions of the 2025 UWMP and WSCP for public review and hold public hearings (anticipated in April and May 2026, respectively).

If you wish to contact the City about this review process, you may email staff at: [email protected]

Sincerely,
Sasha Markham
Public Works Department
Administrative Assistant
D: 925-931-5512
C: 925-248-7392
[email protected]
City of Pleasanton | P.O. Box 520, Pleasanton, CA 94566

Page 609 of 632 ends

From: Sasha Markham <[email protected]>
Sent: Thursday, January 15, 2026 8:37 AM
To: [email protected]; [email protected] Cc: Siew-Chin Yeong <[email protected]>; David Bruzzone <[email protected]>; Rita Di Candia <[email protected]>
Subject: Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Notice of Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

The City of Pleasanton (City) is currently in the process of preparing its 2025 Urban Water Management Plan (UWMP) and associated Water Shortage Contingency Plan (WSCP) as an update to the City’s 2020 UWMP adopted in June 2021. The UWMP is a planning document that reports, describes, and evaluates water deliveries, uses, conservation efforts, supply sources, and supply reliability. The WSCP defines various stages of water supply shortage based on supply conditions and identifies planned responses for each stage.

The Urban Water Management Planning Act (California Water Code §10608–10656) requires urban water suppliers to prepare and adopt an updated UWMP and accompanying WSCP every five years. All urban water suppliers (either publicly or privately owned) that provide water for municipal purposes (either directly or indirectly) to more than 3,000 customers or supply more than 3,000 acre-feet per year are subject to the Urban Water Management Planning Act. As an urban water supplier, the City is required to submit its 2025 UWMP and WSCP to the California Department of Water Resources (DWR) by July 1, 2026.

Coordination with other water management agencies/suppliers, public agencies (e.g., cities and counties), and community organizations in the region is an integral part of updating the City’s UWMP and WSCP. The City invites your agency’s/organization’s participation in this process. City staff are available to discuss the underlying assumptions used to prepare the plans (e.g., projected water demands, supply availability, and land uses, etc.) and other aspects.

The City will release draft versions of the 2025 UWMP and WSCP for public review and hold public hearings (anticipated in April and May 2026, respectively).

If you wish to contact the City about this review process, you may email staff at: [email protected]

Sincerely,
Sasha Markham
Public Works Department
Administrative Assistant
D: 925-931-5512
C: 925-248-7392
[email protected]
City of Pleasanton | P.O. Box 520, Pleasanton, CA 94566

Page 610 of 632 ends

From: Sasha Markham <[email protected]>
Sent: Thursday, January 15, 2026 8:36 AM
To: Pryor, Valerie <[email protected]>; [email protected] Cc: Siew-Chin Yeong <[email protected]>; David Bruzzone <[email protected]>; Rita Di Candia <[email protected]>
Subject: Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Notice of Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

The City of Pleasanton (City) is currently in the process of preparing its 2025 Urban Water Management Plan (UWMP) and associated Water Shortage Contingency Plan (WSCP) as an update to the City’s 2020 UWMP adopted in June 2021. The UWMP is a planning document that reports, describes, and evaluates water deliveries, uses, conservation efforts, supply sources, and supply reliability. The WSCP defines various stages of water supply shortage based on supply conditions and identifies planned responses for each stage.

The Urban Water Management Planning Act (California Water Code §10608–10656) requires urban water suppliers to prepare and adopt an updated UWMP and accompanying WSCP every five years. All urban water suppliers (either publicly or privately owned) that provide water for municipal purposes (either directly or indirectly) to more than 3,000 customers or supply more than 3,000 acre-feet per year are subject to the Urban Water Management Planning Act. As an urban water supplier, the City is required to submit its 2025 UWMP and WSCP to the California Department of Water Resources (DWR) by July 1, 2026.

Coordination with other water management agencies/suppliers, public agencies (e.g., cities and counties), and community organizations in the region is an integral part of updating the City’s UWMP and WSCP. The City invites your agency’s/organization’s participation in this process. City staff are available to discuss the underlying assumptions used to prepare the plans (e.g., projected water demands, supply availability, and land uses, etc.) and other aspects.

The City will release draft versions of the 2025 UWMP and WSCP for public review and hold public hearings (anticipated in April and May 2026, respectively).

If you wish to contact the City about this review process, you may email staff at: [email protected]

Sincerely,
Sasha Markham
Public Works Department
Administrative Assistant
D: 925-931-5512
C: 925-248-7392
[email protected]
City of Pleasanton | P.O. Box 520, Pleasanton, CA 94566

Page 611 of 632 ends

From: Sasha Markham <[email protected]>
Sent: Thursday, January 15, 2026 8:35 AM
To: [email protected]; Knight, Lindsey, BOS District 1 <[email protected]> Cc: Siew-Chin Yeong <[email protected]>; David Bruzzone <[email protected]>; Rita Di Candia <[email protected]>
Subject: Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Notice of Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

The City of Pleasanton (City) is currently in the process of preparing its 2025 Urban Water Management Plan (UWMP) and associated Water Shortage Contingency Plan (WSCP) as an update to the City’s 2020 UWMP adopted in June 2021. The UWMP is a planning document that reports, describes, and evaluates water deliveries, uses, conservation efforts, supply sources, and supply reliability. The WSCP defines various stages of water supply shortage based on supply conditions and identifies planned responses for each stage.

The Urban Water Management Planning Act (California Water Code §10608–10656) requires urban water suppliers to prepare and adopt an updated UWMP and accompanying WSCP every five years. All urban water suppliers (either publicly or privately owned) that provide water for municipal purposes (either directly or indirectly) to more than 3,000 customers or supply more than 3,000 acre-feet per year are subject to the Urban Water Management Planning Act. As an urban water supplier, the City is required to submit its 2025 UWMP and WSCP to the California Department of Water Resources (DWR) by July 1, 2026.

Coordination with other water management agencies/suppliers, public agencies (e.g., cities and counties), and community organizations in the region is an integral part of updating the City’s UWMP and WSCP. The City invites your agency’s/organization’s participation in this process. City staff are available to discuss the underlying assumptions used to prepare the plans (e.g., projected water demands, supply availability, and land uses, etc.) and other aspects.

The City will release draft versions of the 2025 UWMP and WSCP for public review and hold public hearings (anticipated in April and May 2026, respectively).

If you wish to contact the City about this review process, you may email staff at: [email protected]

Sincerely,
Sasha Markham
Public Works Department
Administrative Assistant
D: 925-931-5512
C: 925-248-7392
[email protected]
City of Pleasanton | P.O. Box 520, Pleasanton, CA 94566

Page 612 of 632 ends

From: Sasha Markham <[email protected]>
Sent: Thursday, January 15, 2026 8:43 AM
To: James Paxson <[email protected]>
Cc: Siew-Chin Yeong <[email protected]>; David Bruzzone <[email protected]>; Rita Di Candia <[email protected]>
Subject: Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Notice of Preparation of the 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Dear Mr. Paxson,

The City of Pleasanton (City) is currently in the process of preparing its 2025 Urban Water Management Plan (UWMP) and associated Water Shortage Contingency Plan (WSCP) as an update to the City’s 2020 UWMP adopted in June 2021. The UWMP is a planning document that reports, describes, and evaluates water deliveries, uses, conservation efforts, supply sources, and supply reliability. The WSCP defines various stages of water supply shortage based on supply conditions and identifies planned responses for each stage.

The Urban Water Management Planning Act (California Water Code §10608–10656) requires urban water suppliers to prepare and adopt an updated UWMP and accompanying WSCP every five years. All urban water suppliers (either publicly or privately owned) that provide water for municipal purposes (either directly or indirectly) to more than 3,000 customers or supply more than 3,000 acre-feet per year are subject to the Urban Water Management Planning Act. As an urban water supplier, the City is required to submit its 2025 UWMP and WSCP to the California Department of Water Resources (DWR) by July 1, 2026.

Coordination with other water management agencies/suppliers, public agencies (e.g., cities and counties), and community organizations in the region is an integral part of updating the City’s UWMP and WSCP. The City invites your agency’s/organization’s participation in this process. City staff are available to discuss the underlying assumptions used to prepare the plans (e.g., projected water demands, supply availability, and land uses, etc.) and other aspects.

The City will release draft versions of the 2025 UWMP and WSCP for public review and hold public hearings (anticipated in April and May 2026, respectively).

If you wish to contact the City about this review process, you may email staff at: [email protected]

Sincerely,
Sasha Markham
Public Works Department
Administrative Assistant
D: 925-931-5512
C: 925-248-7392
[email protected]
City of Pleasanton | P.O. Box 520, Pleasanton, CA 94566

Page 613 of 632 ends

From: Sasha Markham <[email protected]>
Sent: Thursday, January 15, 2026 8:41 AM
To: Pleasanton Downtown Association <[email protected]> Cc: Siew-Chin Yeong <[email protected]>; David Bruzzone <[email protected]>; Rita Di Candia <[email protected]>
Subject: Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Notice of Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Dear Ms. Welk,

The City of Pleasanton (City) is currently in the process of preparing its 2025 Urban Water Management Plan (UWMP) and associated Water Shortage Contingency Plan (WSCP) as an update to the City’s 2020 UWMP adopted in June 2021. The UWMP is a planning document that reports, describes, and evaluates water deliveries, uses, conservation efforts, supply sources, and supply reliability. The WSCP defines various stages of water supply shortage based on supply conditions and identifies planned responses for each stage.

The Urban Water Management Planning Act (California Water Code §10608–10656) requires urban water suppliers to prepare and adopt an updated UWMP and accompanying WSCP every five years. All urban water suppliers (either publicly or privately owned) that provide water for municipal purposes (either directly or indirectly) to more than 3,000 customers or supply more than 3,000 acre-feet per year are subject to the Urban Water Management Planning Act. As an urban water supplier, the City is required to submit its 2025 UWMP and WSCP to the California Department of Water Resources (DWR) by July 1, 2026.

Coordination with other water management agencies/suppliers, public agencies (e.g., cities and counties), and community organizations in the region is an integral part of updating the City’s UWMP and WSCP. The City invites your agency’s/organization’s participation in this process. City staff are available to discuss the underlying assumptions used to prepare the plans (e.g., projected water demands, supply availability, and land uses, etc.) and other aspects.

The City will release a draft of the 2025 UWMP and WSCP for public review and hold a public hearing (anticipated in April and May 2026, respectively).

If you wish to contact the City about this review process, you may email staff at: [email protected]

Sincerely,
Sasha Markham
Public Works Department
Administrative Assistant
D: 925-931-5512
C: 925-248-7392
[email protected]
City of Pleasanton | P.O. Box 520, Pleasanton, CA 94566

Page 614 of 632 ends

From: Sasha Markham <[email protected]>
Sent: Thursday, January 15, 2026 8:42 AM
To: [email protected]; [email protected]
Cc: Siew-Chin Yeong <[email protected]>; David Bruzzone <[email protected]>; Rita Di Candia <[email protected]>
Subject: Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Notice of Preparation of the 2025 Urban Water Management Plan and Water Shortage Contingency Plan

The City of Pleasanton (City) is currently in the process of preparing its 2025 Urban Water Management Plan (UWMP) and associated Water Shortage Contingency Plan (WSCP) as an update to the City’s 2020 UWMP adopted in June 2021. The UWMP is a planning document that reports, describes, and evaluates water deliveries, uses, conservation efforts, supply sources, and supply reliability. The WSCP defines various stages of water supply shortage based on supply conditions and identifies planned responses for each stage.

The Urban Water Management Planning Act (California Water Code §10608–10656) requires urban water suppliers to prepare and adopt an updated UWMP and accompanying WSCP every five years. All urban water suppliers (either publicly or privately owned) that provide water for municipal purposes (either directly or indirectly) to more than 3,000 customers or supply more than 3,000 acre-feet per year are subject to the Urban Water Management Planning Act. As an urban water supplier, the City is required to submit its 2025 UWMP and WSCP to the California Department of Water Resources (DWR) by July 1, 2026.

Coordination with other water management agencies/suppliers, public agencies (e.g., cities and counties), and community organizations in the region is an integral part of updating the City’s UWMP and WSCP. The City invites your agency’s/organization’s participation in this process. City staff are available to discuss the underlying assumptions used to prepare the plans (e.g., projected water demands, supply availability, and land uses, etc.) and other aspects.

The City will release draft versions of the 2025 UWMP and WSCP for public review and hold public hearings (anticipated in April and May 2026, respectively).

If you wish to contact the City about this review process, you may email staff at: [email protected]

Sincerely,
Sasha Markham
Public Works Department
Administrative Assistant
D: 925-931-5512
C: 925-248-7392
[email protected]
City of Pleasanton | P.O. Box 520, Pleasanton, CA 94566

Page 615 of 632 ends

From: Sasha Markham <[email protected]>
Sent: Thursday, January 15, 2026 8:43 AM
To: [email protected]; [email protected]; [email protected]; [email protected] Cc: Siew-Chin Yeong <[email protected]>; David Bruzzone <[email protected]>; Rita Di Candia <[email protected]>
Subject: Preparation of 2025 Urban Water Management Plan and Water Shortage Contingency Plan

Notice of Preparation of the 2025 Urban Water Management Plan and Water Shortage Contingency Plan

The City of Pleasanton (City) is currently in the process of preparing its 2025 Urban Water Management Plan (UWMP) and associated Water Shortage Contingency Plan (WSCP) as an update to the City’s 2020 UWMP adopted in June 2021. The UWMP is a planning document that reports, describes, and evaluates water deliveries, uses, conservation efforts, supply sources, and supply reliability. The WSCP defines various stages of water supply shortage based on supply conditions and identifies planned responses for each stage.

The Urban Water Management Planning Act (California Water Code §10608–10656) requires urban water suppliers to prepare and adopt an updated UWMP and accompanying WSCP every five years. All urban water suppliers (either publicly or privately owned) that provide water for municipal purposes (either directly or indirectly) to more than 3,000 customers or supply more than 3,000 acre-feet per year are subject to the Urban Water Management Planning Act. As an urban water supplier, the City is required to submit its 2025 UWMP and WSCP to the California Department of Water Resources (DWR) by July 1, 2026.

Coordination with other water management agencies/suppliers, public agencies (e.g., cities and counties), and community organizations in the region is an integral part of updating the City’s UWMP and WSCP. The City invites your agency’s/organization’s participation in this process. City staff are available to discuss the underlying assumptions used to prepare the plans (e.g., projected water demands, supply availability, and land uses, etc.) and other aspects.

The City will release draft versions of the 2025 UWMP and WSCP for public review and hold public hearings (anticipated in April and May 2026, respectively).

If you wish to contact the City about this review process, you may email staff at: [email protected]

Sincerely,
Sasha Markham
Public Works Department
Administrative Assistant
D: 925-931-5512
C: 925-248-7392
[email protected]
City of Pleasanton | P.O. Box 520, Pleasanton, CA 94566

Page 616 of 632 ends

2025 Urban Water Management Plan
City of Pleasanton

APPENDIX F
Agency and Public Notices
[PLACEHOLDER PAGE FOR PUBLIC HEARING NOTICES]

Page 617 of 632 ends

2025 Urban Water Management Plan
City of Pleasanton

APPENDIX F
Agency and Public Notices
[PLACEHOLDER FOR PROOF OF PUBLICATION]

Page 618 of 632 ends

2025 Urban Water Management Plan
City of Pleasanton

APPENDIX F
Agency and Public Notices
[PLACEHOLDER FOR PUBLIC DRAFT COMMENTS]

Page 619 of 632 ends

2025 Urban Water Management Plan
City of Pleasanton

APPENDIX G
2025 UWMP and WSCP Adoption Resolutions
[PLACEHOLDER FOR RESOLUTIONS; to be added following City Council’s adoption of 2025 UWMP and WSCP.]

Page 620 of 632 ends

1 2025 Urban Water Management Plan
Public Hearing – June 2, 2026
Presentation Outline

1. Overview

2. The 2025 Urban Water Management Plan

3. Demand Projections

4. Supply Projections

5. Reliability Assessment

6. Water Shortage Contingency Plan

7. Next Steps
1 2
Attachment 2

Page 621 of 632 ends

2 Overview
What is an Urban Water Management Plan (UWMP)?
• Required under CA’s Urban Water
Management Planning Act.
• Evaluates reliability of water supply to
meet projected demand over the next 20
years.
• Updated every 5 years.

UWMP Act
 Enacted In 1983
 Major updates for the 1995, 2005 and
2020 UWMPs
UWMP Act
 Enacted In 1983
 Major updates for the 1995, 2005 and
2020 UWMPs
3 4

Page 622 of 632 ends

3 Why are UWMPs important?
•Pre-requisite to receive State funding such as grants. •Supports assessment of sufficient water supply with new development.
•Key document that articulates long-term water planning strategy to the public and governing body and promotes the “value of water”. •Documents the
process of water shortage determination and options
in the event of a water shortage.

The 2025 UWMP
5 6

Page 623 of 632 ends

4 The 2025 UWMP
Changes since the 2020 UWMP:
• No changes to UWMP requirements
• Some minor statutory changes and
updates to the California Department of
Water Resources (DWR) Guidebook
(mostly for clarification)
• New water use efficiency standards:

Annual urban water use objective
(“Making Conservation a CA Way of
Life”) and non-functional turf ban –
compliance begins January 1, 2027
Preparation and Adoption of the 2025 UWMP
• Pleasanton sent notices to relevant water
agencies
and community organizations in January
2026.

Notice of Preparation
• Public Draft posted to City’s website on May 7th.
• Notice sent to previously contacted groups.
• Notice published in the newspaper for two
consecutive
weeks before this evening’s hearing.

Notice of Public
Hearing
• Holding public hearing at this evening’s City
Council
meeting to discuss key findings and seek
adoption of
2025 UWMP and WSCP.

Public Hearing and
Adoption
7 8

Page 624 of 632 ends

5 Demand Projections
Population & Water Demand: Historical
0 20,000
40,000
60,000
80,000
100,000
0 5,000
10,000
15,000
20,000
25,000
2010 2015 2020 2025 2030 2035 2040 2045
Population
Water Demand (AFY)
Historical Demand Historical Population
AFY = acre-feet per year
9 10

Page 625 of 632 ends

6 Population & Water Demand: Historical & Projected
12,663 15,159 16,015 16,874 17,832
0 20,000
40,000
60,000
80,000
100,000
0 5,000
10,000
15,000
20,000
25,000
2010 2015 2020 2025 2030 2035 2040 2045
Population
Water Demand (AFY)
Historical Demand Projected Demand Growth
Historical Population Projected Population Growth
AFY = acre-feet per year
Demand Projections: By Customer Sector
13,736
16,401 17,288 18,178 19,172
0 5,000
10,000
15,000
20,000
25,000
2025 2030 2035 2040 2045
Water Use (AFY)
Year
Landscape - Recycled Water
Distribution System Water Loss
Landscape - Potable
Industrial
Commercial
Multi-Family
Single Family
Non-
potable
Potable
(drinking)
water
LEGEND
11 12

Page 626 of 632 ends

7 Supply Projections
Pleasanton’s Water Supply Portfolio
Purchased Water
from Zone 7
Imported Water (State Water Project) &
Local Runoff (stored in Lake Del Valle)
https://water.ca.gov/Programs/State-Water-
Project/SWP-Facilities/Delta
Groundwater
(3,500 AFY quota) Recycled Water
Current Joint Groundwater Wells project
with Zone 7 expected to restore the City’s
access to groundwater supply by 2030
https://www.zone7waterca.gov/groundwater
Recycled Water from the DSRSD-EBMUD
Recycled Water Authority (DERWA) and
Livermore (used for irrigation)
https://www.dsrsd.com/Businesses/Recycled-Water-
Customers/Recycled-Water-Guidelines-and-
Requirements
13 14

Page 627 of 632 ends

8 Supply Projections
0 5,000
10,000
15,000
20,000
2025
(Actual)
2030 2035 2040 2045
Water Supply (AFY)
Purchased Water Groundwater Recycled Water
7%
18%
75%
Reliability Assessment
15 16

Page 628 of 632 ends

9 Reliability Assessment
2045204020352030Water Year Type
100%100%100%100%Normal Year
100%100%100%100%Single Dry Year
90%100%100%100%Fifth Year of Multi-year Drought
Purchased Water
(Zone 7)
• By 2045, anticipated 14%
shortage in fifth year of
multi-year drought.
• Water supply projects to
strengthen reliability.

Groundwater
• Pumping quota restored
in 2030
• Reliable in all year
types.

Recycled Water
• Drought resilient supply
• Reliable in all year
types.

Water Shortage Contingency Plan
(WSCP)
17 18

Page 629 of 632 ends

10 •Separate plan adopted
alongside the
2025 UWMP
•Addresses shortages caused
by drought, water quality
concerns, or emergency
events
•A dynamic, adaptive plan;
designed to be updated as
conditions change
Water Shortage Contingency Plan (WSCP)
Pleasanton’s drought response campaign from Oct 2021
Water Shortage Monitoring & WSCP Implementation
Process

1. Annual Water Supply &
Demand Assessment
(AWSDA)

2. Shortage Declaration

3. Shortage Response

4. Public Communication

5. Monitor and Refine
19 20

Page 630 of 632 ends

11 EnforcementShortage
Range
Shortage
Level
OptionalUp to 10%1
Optional /
MandatoryUp to 20%2
MandatoryUp to 30%3
MandatoryUp to 40%4
MandatoryUp to 50%5
Mandatory>50%6
Tools for Managing Water Shortage
• Demand reduction actions
codified in Pleasanton Municipal
Code Chapter 9.30
• Excess water use charges
• City water system operational
changes
• W
ater supply augmentation
actions
Shortage Response Actions
Water Shortage Levels
Recommendation
21 22

Page 631 of 632 ends

12 •Staff recommend City Council adopts a resolution to approve the City of Pleasanton’
s 2025 UWMP and WSCP.
•Adoption of these plans aligns with and supports the City’s related goals and plans, including:
•Investing in our Environment and Safeguarding
our City by
assessing the adequacy of the future water
supply and strategic
planning for action implementation
during a water shortage.
•Pleasanton’s Climate Action Plan 2.0
•Pleasanton's 2023-2031 Housing Update
Recommendation
Questions?