Dear Mr.Zabinsky,
Here is Point Arena's 2021 annual report. The report includes summaries of monitoring data and system work. Also included is the annual flow meter certification.
The discharge limits for the plant are; B.O.D., Monthly Average of 50, Daily Maximum, 80, Suspended Solids: Monthly Average 50, Daily Maximum 80:Settleable Solids: Monthly Average 0.1, Daily Maximum 0.2, Coliform Bacteria Monthly median Most probable number of 23, daily maximum 230.
The Point Arena Treatment Plant was in/out of compliance in the following manner:
January 2021: The plant complies of all discharge requirements February 2021: The plant complies of all discharge requirements March 2021: The plant complies of all discharge requirements April 2021: The plant complies of all discharge requirements May 2021: The plant wasn't in compliance of all discharge requirements. We exceeded our "TSS" limit. Our limit is: 50 mg/l average for each month. Our monthly average for this month was 59.75 mg/l. We experienced a rapid Algae bloom in our lagoonland this has caused us to exceed our limit. We sprayed the Algae with June 2021: The plant complies of all discharge requirements July 2021: The plant wasn't in compliance of all discharge requirements. We exceeded our ISS and Coliform monthly average. I have been struggling to keep algae out of our Lagoon's. This is what I feel is the reason for high TSS and Coliform. I also believe the lab messed up on the week we had 1600 MPN of coliform, as we haven't had a high coliform in so long. And our Influent doesn't even have 1600 MPN of Coliform in it.
August 2021: The plant wasn't in compliance of all discharge requirements. Our TSS" wasn't in compliance due to Algae bloom, been struggling with Algae since May 2021. We are seeing Duckweed return now and the "TSS" is slowly going down each week. Duckweed is slowly killing the Algae off.
September 2021: The plant wasn't in compliance of all discharge requirements.
Still dealing with the remains of the "Algae". We went from 87.25 mg/l average down to
53.6 mg/l average this month. So it's going down and we are keeping the duckweed on the lagoon to reduce the Algae growth and false TSS.
October 2021: The plant complies of all discharge requirements.
November 2021: The plant complies of all discharge requirements.
December 2021: The plant complies of all discharge requirements.
Collections: We performed Collection System Cleaning; we jetted all the mainlines in the system. This is done two to three times a year in order to reduce SSO's, also helps to assist in predicting when each section of the collection system needs to be serviced based on prior action and SSO history. We didn't have any SO's in 2021. We have been Jetting Monthly on spots we have had prior problems with.
Treatment: Our treatment process has been working well. We weren't in compliance with all samples for the year. We struggled for a bit on our "TSS" monthly average due to Algae bloom in our lagoon. We killed it, by spraying Pondzilla/Clippers on it a few times. Finally, we had duckweed start to return and numbers are going down and down. The plant is running smooth again.
Discharge: The treatment plant's effluent is pumped to four percolation ponds south of the treatment plant. These ponds are maintained by yearly breaking up of the sand and gravel mixture in the bottom of the ponds with a single tooth harrow that breaks the bottom to a depth of 2'6". We performed this routine maintenance on the ponds in June and July of 2021. We also perform weed control with mower's and weed whackers threw out the year.
Soldani Spring box has no flow; if and when it starts to flow, we will resume testing.
I certify under penalty of law that this document and all attachments were prepared under my direction in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted, is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine or imprisonment for knowing violations.
Respectfully,
Joseph C. Wilson (CPO)
faral
Paul Anderson
City Manager
City of Point Arena
ORDER No. R1-2003-0001
CITY OF POINT ARENA
WASTEWATER TREATMENT PLANT
YEAR OF 2021
[MONITORING AND REPORTING PROGRAM NO. R1-2003-0001|
INFLUENT MONITORING
MEAN DAILY FLOW,MGD 0.03271 0.03261 0.02935 0.02333 [0.02145 0.0207 0.02052 0.02026| 0.01997| 0.04719| 0.04447 0.06871
MAX DAILY FLOW,MGD
RAINFALL INCHES
EFFLUENT MONITORING JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC BOD (20 DEG.C.5 DAY mg/l) 28.5 18.5 10.2 21.333 28.5 19.75 31.75 13.85 12.775 18.9 8.7 7.6 TSS mg/l 508 8320 3068 3010 86825 89 848 9095 850 2385 30 600฿
HYDROGEN ION PH
SETTABLE MATTER mi/l <1 <.1 <1 < 1 <.1 <.1
CHLORINE RES. Mg/l 11 10.475 9.4 11
TOTAL COLIFORM MPN/100ml ND/<1.8ND/<1.8 ND/<1.8 ND/<1.8 ND/<18 ND/<1.8 493.75 MEAN DAILY FLOW MGD 0.03412 0.03351 0.02469 0.01967 0.01162 0.01553 0.01535 0.01646 0.01864 0.07095 0.04302 0.09603
TO SPRAY FIELD MG
CITY OF POINT ARENA - PERCOLATION POND LEVELS
ORDER NO.R1-2003-0001 WDID NO.1B800450MEN
DATE POND 1 Pond 2 POND 3 POND 4 %
January 6, 2021 0 3" 1.25
January 13, 2021 0 0 0 6" 2.5
January 20, 2021 0 0 0 6" 2.5
January 27, 2021 0 0 0 5
February 3, 2021 0 1.25
February 10, 2021 2" 2"
February 17, 2021 0 0
February 24, 2021 0 0 0
March 3, 2021 0 1.25
March 10, 2021 0 2.5
March 17, 2021 0 0 0 O
March 24, 2021 0 0 6" 2.5
March 31, 2021 0 0
April 7, 2021 0
April 14, 2021 0 0 000
April 21, 2021 0 0 0
April 28, 2021
May 5, 2021
May 12, 2021 0
May 19, 2021 0
May 26, 2021
June 2, 2021 0
June 9, 2021 0
June 16, 2021
June 23, 2021
June 30, 2021
July 7, 2021 0
July 14, 2021 0
July 21, 2021
July 28, 2021 0
August 4, 2021
August 11, 2021 0
August 18, 2021 0
August 25, 2021 0
September 1, 2021 0
September 8, 2021 0
September 15, 2021 0
September 22, 2021 0
September 29, 2021
October 6, 2021
October 13, 2021 0
October 20, 2021 0
October 27, 2021 1°
090099 •00ododd000d00000o •000N 10000•
November 3, 2021 0
November 10, 2021
November 17, 2021
November 23, 2021 0
December 1, 2021 0
December 8, 2021 0
December 15, 2021
December 22, 2021 6"
December 29, 2021 6"
POND LEVEL
— POND LEVEL
15 10
25 29 33 41 45
ESS TECHNOLOGIES
P.O. Box 845 • 15083 Canyon Seven Road Forestville, California 95436-0845 City of Point Arena
P.O. Box 67
Point Arena, CA 95468
December 31, 2021
Re: Treatment plant influent calibration
With the assistance of the plant operators, we zeroed the flowmeter by stopping feat and used the false-target to inser into the throat of the fume to test 100% This letter is sent to document the fact that your Greyline Instruments SLT 5.0 ultrasonic flow transmitter was set up and programmed correctly for the measurement installation. In conjunction with the 3" Parshall flume the system will accurately measure 0 to 1.02 MGD.
The Honeywell DR 4300 chart recorder was found to be within +/- 1 %. The display section of the recorder indicated:
0.000 @ 3.99mA or 0%, 0.500 @ 12.00mA or 50% 0.999 @ 20.00mA or 100% Again well within the manufacturers specifications.
If you have any questions or concerns, please do not hesitate to email or call me.
Regards,
J.A. Falejczyk
CSS-Technologies.com
Voice: 866-869-3488 FAX:707-885-1078