POINT ARENA CITY COUNCIL

AGENDA ITEM SUMMARY
AGENDA ITEM: X C
MEETING DATE: 3/22/2022
TITLE
Fiscal Year 2021-2022 Mid-Year Budget Review

RECOMMENDED ACTION
Receive report and discuss

ANALYSIS
The mid-year budget review provides the City Council an opportunity to review the Fiscal Year 2021-2022 budget and adjust if necessary.

This year, the City’s budget is more or less on track with the Final Budget adopted by the Council in September 2021.

General Fund
Projected revenues are expected to increase approximately $144,000 – or 35% -- over the adopted budget. This increase is largely from unanticipated gains in sales tax and Transit Occupancy Tax as well as a federal American Rescue Plan Act grant of approximately $54,000. Projected expenses are on target with the adopted budget.

Parks costs have increased, largely as the result of an increased focus on maintaining the park and improving amenities. There will be additional expenses for improvements to the park such a new swingset and dog park. These costs will be covered by $175,000 in funding from the Prop 68 Park Bond.

Planning costs are on track but planning revenues have been less than expected. Your planner has worked with several potential applicants who have not yet submitted projects requiring a cost recovery deposit.

Administration costs appear to be on track.

Gas Tax Fund
The dramatic increase in expense in this fund is the result of engineering costs for the Mill Street and Center Street projects. Much of that funding will be recoverable in the reimbursement process.

Revolving Loan Fund
RLF expenses are lower than projected due to less activity.

Wastewater Operations & R&R
Revenue and expenses are on track.

Pier
Pier revenue appears to be on track. The projected subsidy from the general fund is expected to be approximately $50,000. Staff will be bringing back a proposal that more accurately reflectsthe income and expense of the Pier fund with potential modifications to the use of this fund.

Pier R&R
This fund contains two large expenses: engineering costs for the Arena Cove Rehabilitation Project and the advance purchase of pilings for the Pier Pilings Project.

These are largely reimbursable from CalOES/FEMA. Even with those expenses, the R&R fund is running above projections. This is due to deferred maintenance being performed to ensure the product and boat hoists are brought current and remain viable.

Used Oil
Expenses are running slightly higher; the City has not yet received its annual grant.

Recycling
Recycling expenses have decreased due to staffing changes. Staff will be bringing back some options for reducing or nearly eliminating staff time which will allow the annual $5000 CalRecycle grant to be used for other purposes to promote recycling. ======================
In this Fiscal Year, the City will have started and completed four major construction projects: the Arena Cove Parking Lot Rehabilitation; Pier Pilings Replacement; Mill Street Sidewalk, Roadway and Drainage Rehabilitation; and Center Street/Riverside Improvement. All told, these projects account for approximately $2 million in construction in Point Arena, the largest expenditure of public works funding since the construction of Point Arena Pier nearly 35 years.

The annual City budget is itself only approximately $1 million annually. Between all four projects, the City is expected to receive approximately 80% in reimbursed funds from CalOES/FEMA and the Local Partnership Program of the California Transportation Commission. Other funding has been provided by the Mendocino Council of Governments.

These investments will benefit Point Arena for years to come.

While staff and your accountant have attempted to isolate those projects in a separate Capital Projects fund, there are some expenses reflected in other funds that will be reclassified as reimbursement funds arrive. For example, construction management costs reflected in engineering costs are largely reimbursable.

All told, the overall budget structure is somewhat in flux due to these projects and staff expects things will be clearer and closer to normal in the 2022-2023 fiscal year.

FISCAL IMPACT
See above.

ATTACHMENTS
• FY 2021-2022 Mid-Year Budget Review Summary
• FY 2021-2022 Mid-Year Budget

CITY MANAGER SIGNATURE
_________________________________
Paul Andersen, City Manager
21‐22
Final
Budget
Actuals
through
12/31/21  %
6/30/22
Estimated
Actuals
$ Change
from
Adopted
% Change
from
Adopted
General Fund
General Revenues 414,800      279,592      67% 559,184      144,384      35% Planning Revenues 40,000        10,915        27% 21,830        (18,170)       ‐45% COPS Funding 157,000      95,929        61% 158,729      1,729          1% Recycling Grant 5,000          ‐               0% 5,000          ‐               0% BLM Reimbursements 4,000          4,924          123% 4,924          924              23% Administration Costs 319,376      169,185      53% 338,370      18,994        6% Legislative Costs 24,059        6,224          26% 12,448        (11,611)       ‐48% Planning Costs 50,200        24,028        48% 48,056        (2,144)         ‐4% Public Safety Costs 106,388      57,524        54% 115,048      8,660          8% Recycling Costs 8,100          1,766          22% 3,532          (4,568)         ‐56% Maintenance Costs 22,531        10,160        45% 20,320        (2,211)         ‐10% Parks Costs 36,837        27,954        76% 55,908        19,071        52% Gas Tax Fund
Revenues 85,983        50,862        59% 101,724      15,741        18% Expenses 50,860        80,175        158% 160,350      109,490      215% Note: $43883 Reimbursable
Revolving Loan Fund
Revenues 16,000        6,079          38% 12,158        (3,842)         ‐24% Expenses 26,463        29,095        110% 58,190        31,727        120% WWTP
Sewer Fees ‐ Operations 219,000      114,835      52% 229,670      10,670        5% Sewer Fees ‐ Capital 54,000        54,001        100% 108,002      54,002        100% Connection Fees 8,800          n/a ‐               (8,800)         n/a Operations Costs 176,548      78,066        44% 156,132      (20,416)       ‐12% Capital Costs 29,760        27,151        91% 54,302        24,542        82% Pier
Fees & Services 43,400        20,552        47% 41,104        (2,296)         ‐5% Storm Damage Grants ‐               8,657          17,314        17,314 Operating Costs 83,789        58,178        69% 116,356      32,567        39% Storm Damage Mitigation ‐               ‐               ‐ Repair & Replacement Costs 41,374        166,099      401% 210,000      168,626      408% Note: $96229 Reimbursable
Used Oil
Revenues 5,000          0% 5,000          ‐               0% Expenses 5,433          3,594          66% 7,188          1,755          32% City of Point Arena
P&L - Governmental (exc. Fixed Assets)
July through December 2021
Admin Legislative Maintenance Parks Planning Recycling Safety Streets (GF) (GF) (GF) (GF) (GF) (GF) (GF) (GF) Total GF
Ordinary Income/Expense
Income
4100 ꞏ Property Taxes
4101 ꞏ Property Tax, Secured, Current 50,356.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50,356.03 Total 4100 ꞏ Property Taxes 50,356.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50,356.03 4108 ꞏ Sales Tax - General 34,792.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34,792.16 4109 ꞏ Sales Tax - Streets 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.004111 ꞏ Transient Occupancy Tax 96,368.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 96,368.38 4116 ꞏ Cannabis Excise Tax - Rec 7,649.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,649.81 4117 ꞏ TOT Measure AC 19,273.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,273.68 4125 ꞏ BLM Reimbursements 0.00 0.00 4,923.66 0.00 0.00 0.00 0.00 0.00 4,923.66 4200 ꞏ Gas Tax 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.004250 ꞏ RMRA SB1 Funds 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.004300 ꞏ Grant Revenues 4340 ꞏ COP's AB1913 Allocation 0.00 0.00 0.00 0.00 0.00 0.00 95,928.95 0.00 95,928.95 4300 ꞏ Grant Revenues - Other 53,705.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 53,705.00 Total 4300 ꞏ Grant Revenues 53,705.00 0.00 0.00 0.00 0.00 0.00 95,928.95 0.00 149,633.954420 ꞏ Business License Fee 387.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 387.75 4440 ꞏ Planning Fees/Permits 0.00 0.00 0.00 0.00 10,915.00 0.00 0.00 0.00 10,915.00 4510 ꞏ Interest Income 325.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 325.33 4590 ꞏ Principal Collected 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4990 ꞏ Miscellaneous Sales & Services 895.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 895.20 Total Income 263,753.34 0.00 4,923.66 0.00 10,915.00 0.00 95,928.95 0.00 375,520.95 Gross Profit 263,753.34 0.00 4,923.66 0.00 10,915.00 0.00 95,928.95 0.00 375,520.95 Expense
6100 ꞏ Salaries & Wages
6110 ꞏ Salaries & Wages, Regular 71,584.68 18.26 3,583.28 10,832.05 351.21 1,252.69 687.15 0.00 88,309.32 6120 ꞏ Overtime Wages 159.91 0.00 0.61 5.91 0.00 58.25 0.00 0.00 224.686140 ꞏ Vacation Pay 1,675.57 0.00 0.00 52.70 54.36 29.48 37.87 0.00 1,849.98 6150 ꞏ Sick Pay 1,918.91 0.00 0.00 3.16 30.54 15.40 14.05 0.00 1,982.06 6160 ꞏ Holiday Pay 2,009.54 0.00 200.15 626.30 35.43 59.75 12.83 0.00 2,944.00 6190 ꞏ Other Pay 993.79 1,950.00 0.00 0.00 0.00 7.98 0.00 0.00 2,951.77 Total 6100 ꞏ Salaries & Wages 78,342.40 1,968.26 3,784.04 11,520.12 471.54 1,423.55 751.90 0.00 98,261.816200 ꞏ Payroll Taxes & Benefits 6210 ꞏ FICA/Medicare - Employer 6,005.10 150.61 287.77 892.90 36.07 106.33 57.52 0.00 7,536.30 6220 ꞏ Unemployment Insurance 0.00 0.31 28.96 33.86 0.00 1.23 0.00 0.00 64.366240 ꞏ Health Benefits 6241 ꞏ Health Insurance - Employer 12,802.18 0.00 2,476.08 2,841.37 0.00 234.83 0.00 0.00 18,354.46 6242 ꞏ HSA - Employer 2,933.33 0.00 0.00 825.00 0.00 0.00 0.00 0.00 3,758.33

Page 1 of 2 ends

Admin Legislative Maintenance Parks Planning Recycling Safety Streets (GF) (GF) (GF) (GF) (GF) (GF) (GF) (GF) Total GF
Total 6240 ꞏ Health Benefits 15,735.51 0.00 2,476.08 3,666.37 0.00 234.83 0.00 0.00 22,112.79 6250 ꞏ SIMPLE IRA - Employer 1,596.46 0.00 0.00 0.00 14.15 0.00 22.55 0.00 1,633.16 Total 6200 ꞏ Payroll Taxes & Benefits 23,337.07 150.92 2,792.81 4,593.13 50.22 342.39 80.07 0.00 31,346.616300 ꞏ General Administration Costs 6310 ꞏ Advertising/Noticing 0.00 360.00 0.00 0.00 684.00 0.00 0.00 630.00 1,674.00 6330 ꞏ Dues & Memberships 3,653.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,653.91 6340 ꞏ Liability Insurance 28,022.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28,022.006347 ꞏ Property Insurance 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.006350 ꞏ Licenses/Permits/Fees 455.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 455.286360 ꞏ Office Supplies 173.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 173.796365 ꞏ Postage 587.75 0.00 0.00 0.00 15.36 0.00 0.00 0.00 603.116370 ꞏ Printing 379.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 379.006390 ꞏ Training/Travel 2,356.58 168.20 42.00 89.60 0.00 0.00 0.00 0.00 2,656.38 Total 6300 ꞏ General Administration Costs 35,628.31 528.20 42.00 89.60 699.36 0.00 0.00 630.00 37,617.47 6400 ꞏ Professional Services
6410 ꞏ Professional - Accounting 6,840.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,840.62 6420 ꞏ Professional - Audit 5,225.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,225.00 6430 ꞏ Professional - Consultant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.006440 ꞏ Professional - Engineer 0.00 0.00 0.00 0.00 22,591.25 0.00 0.00 0.00 22,591.256460 ꞏ City Attorney 1,195.84 3,576.68 0.00 0.00 166.50 0.00 0.00 0.00 4,939.02 Total 6400 ꞏ Professional Services 13,261.46 3,576.68 0.00 0.00 22,757.75 0.00 0.00 0.00 39,595.89 6500 ꞏ Program Supplies & Services
6510 ꞏ Disposal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 63.00 63.00 6521 ꞏ Rent - Equipment 2,554.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,554.24 6522 ꞏ Rent - Spaces 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.006530 ꞏ Outside Services 3,263.08 0.00 0.00 3,948.81 49.00 0.00 7,524.00 0.00 14,784.89 6542 ꞏ Repairs/Maint - Equipment 0.00 0.00 1,453.87 505.11 0.00 0.00 0.00 1,493.10 3,452.086544 ꞏ Repairs/Maint - Infrastructure 0.00 0.00 0.00 570.96 0.00 0.00 0.00 0.00 570.966551 ꞏ Supplies - Safety 440.36 0.00 259.85 2,234.10 0.00 0.00 0.00 727.35 3,661.666552 ꞏ Supplies & Tools 2,391.18 0.00 1,728.84 1,784.21 0.00 0.00 0.00 572.73 6,476.966560 ꞏ Telephone 1,738.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,738.35 6561 ꞏ Utilities 5,263.61 0.00 98.54 2,101.10 0.00 0.00 0.00 3,132.46 10,595.71 6565 ꞏ Internet Fees 2,692.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,692.86 6572 ꞏ Vehicle - Fuel 0.00 0.00 0.00 607.04 0.00 0.00 0.00 94.30 701.346580 ꞏ COPS 0.00 0.00 0.00 0.00 0.00 0.00 49,999.98 0.00 49,999.98 Total 6500 ꞏ Program Supplies & Services 18,343.68 0.00 3,541.10 11,751.33 49.00 0.00 57,523.98 6,082.94 97,292.03 6900 ꞏ Other Expenses
6910 ꞏ Miscellaneous Expense 272.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 272.20 Total 6900 ꞏ Other Expenses 272.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 272.20 Total Expense 169,185.12 6,224.06 10,159.95 27,954.18 24,027.87 1,765.94 58,355.95 6,712.94 304,386.01 Net Ordinary Income 94,568.22 -6,224.06 -5,236.29 -27,954.18 -13,112.87 -1,765.94 37,573.00 -6,712.94 71,134.94 Net Income 94,568.22 -6,224.06 -5,236.29 -27,954.18 -13,112.87 -1,765.94 37,573.00 -6,712.94 71,134.94

Page 2 of 2 ends

City of Point Arena 10:43 AM
P&L Enterprise 03/18/2022
July through December 2021 Accrual Basis

WWR PRF
(CP) (CP) Total CP PR WW TOTAL
Ordinary Income/Expense
Income
4300 ꞏ Grant Revenues
4360 ꞏ State Water Grants 19,421.00 0.00 19,421.00 0.00 0.00 19,421.004300 ꞏ Grant Revenues - Other 0.00 8,657.00 8,657.00 0.00 0.00 8,657.00 Total 4300 ꞏ Grant Revenues 19,421.00 8,657.00 28,078.00 0.00 0.00 28,078.004510 ꞏ Interest Income 0.00 0.00 0.00 0.00 67.15 67.154610 ꞏ Boat Storage 0.00 0.00 0.00 1,554.50 0.00 1,554.504620 ꞏ Fish Poundage 0.00 0.00 0.00 8,632.17 0.00 8,632.174640 ꞏ Launch Fees 0.00 0.00 0.00 9,875.63 0.00 9,875.634710 ꞏ Sewer Service Fees 0.00 0.00 0.00 0.00 115,767.70 115,767.704715 ꞏ Sewer Fees R&R Allocation 34,579.50 0.00 34,579.50 0.00 0.00 34,579.504990 ꞏ Miscellaneous Sales & Services 0.00 0.00 0.00 489.20 0.00 489.20 Total Income 54,000.50 8,657.00 62,657.50 20,551.50 115,834.85 199,043.85 Gross Profit 54,000.50 8,657.00 62,657.50 20,551.50 115,834.85 199,043.85 Expense
6100 ꞏ Salaries & Wages
6110 ꞏ Salaries & Wages, Regular 13,912.62 20,582.21 34,494.83 23,408.91 25,198.40 83,102.146120 ꞏ Overtime Wages 139.79 536.14 675.93 882.60 372.67 1,931.206140 ꞏ Vacation Pay 55.24 1,049.95 1,105.19 7,031.29 1,428.07 9,564.556150 ꞏ Sick Pay 491.64 178.35 669.99 2,682.83 2,840.65 6,193.476160 ꞏ Holiday Pay 722.82 760.25 1,483.07 1,300.66 1,064.03 3,847.766170 ꞏ On-Call Pay 0.00 0.00 0.00 0.00 5,460.00 5,460.00 6190 ꞏ Other Pay 0.00 80.62 80.62 336.80 61.43 478.85
Total 6100 ꞏ Salaries & Wages 15,322.11 23,187.52 38,509.63 35,643.09 36,425.25 110,577.976200 ꞏ Payroll Taxes & Benefits 6210 ꞏ FICA/Medicare - Employer 1,171.88 1,748.58 2,920.46 2,458.75 2,788.76 8,167.976220 ꞏ Unemployment Insurance 16.64 128.51 145.15 154.02 23.83 323.006240 ꞏ Health Benefits 6241 ꞏ Health Insurance - Employer 1,239.48 0.00 1,239.48 3,959.96 3,861.76 9,061.206242 ꞏ HSA - Employer 0.00 0.00 0.00 1,100.00 0.00 1,100.00

Page 1 of 3 ends

WWR PRF
(CP) (CP) Total CP PR WW TOTAL
Total 6240 ꞏ Health Benefits 1,239.48 0.00 1,239.48 5,059.96 3,861.76 10,161.206250 ꞏ SIMPLE IRA - Employer 30.39 294.42 324.81 0.00 0.00 324.81 Total 6200 ꞏ Payroll Taxes & Benefits 2,458.39 2,171.51 4,629.90 7,672.73 6,674.35 18,976.986300 ꞏ General Administration Costs 6310 ꞏ Advertising/Noticing 0.00 420.00 420.00 317.00 0.00 737.00 6360 ꞏ Office Supplies 0.00 0.00 0.00 0.00 211.30 211.306390 ꞏ Training/Travel 0.00 0.00 0.00 175.28 89.60 264.88 Total 6300 ꞏ General Administration Costs 0.00 420.00 420.00 492.28 300.90 1,213.186400 ꞏ Professional Services 6440 ꞏ Professional - Engineer 8,801.25 73,139.10 81,940.35 0.00 573.75 82,514.10 6450 ꞏ Professional - Legal 0.00 0.00 0.00 5,032.50 0.00 5,032.506460 ꞏ City Attorney 0.00 370.00 370.00 65.65 0.00 435.65 Total 6400 ꞏ Professional Services 8,801.25 73,509.10 82,310.35 5,098.15 573.75 87,982.256500 ꞏ Program Supplies & Services 6521 ꞏ Rent - Equipment 0.00 0.00 0.00 469.34 0.00 469.34 6530 ꞏ Outside Services 557.00 0.00 557.00 502.93 885.00 1,944.936541 ꞏ Repairs/Maint - Building 0.00 325.92 325.92 0.00 0.00 325.926542 ꞏ Repairs/Maint - Equipment 0.00 2,152.89 2,152.89 474.39 0.00 2,627.286544 ꞏ Repairs/Maint - Infrastructure 0.00 23,090.50 23,090.50 0.00 0.00 23,090.506551 ꞏ Supplies - Safety 0.00 1,148.12 1,148.12 1,060.84 849.55 3,058.516552 ꞏ Supplies & Tools 12.95 1,210.90 1,223.85 1,723.00 934.58 3,881.436560 ꞏ Telephone 0.00 0.00 0.00 235.15 349.24 584.39 6561 ꞏ Utilities 0.00 0.00 0.00 4,039.55 12,007.21 16,046.766565 ꞏ Internet Fees 0.00 100.00 100.00 0.00 0.00 100.006572 ꞏ Vehicle - Fuel 0.00 59.43 59.43 739.93 1,687.83 2,487.19 Total 6500 ꞏ Program Supplies & Services 569.95 28,087.76 28,657.71 9,245.13 16,713.41 54,616.256600 ꞏ Enterprise Supplies & Services 6610 ꞏ Chlorine 0.00 0.00 0.00 0.00 10,221.93 10,221.93 6630 ꞏ Lab/Testing 0.00 0.00 0.00 0.00 5,000.00 5,000.00 Total 6600 ꞏ Enterprise Supplies & Services 0.00 0.00 0.00 0.00 15,221.93 15,221.936900 ꞏ Other Expenses 6910 ꞏ Miscellaneous Expense 0.00 0.00 0.00 27.14 0.00 27.14 6950 ꞏ Finance Charges 0.00 0.00 0.00 0.00 2,155.98 2,155.98 Total 6900 ꞏ Other Expenses 0.00 0.00 0.00 27.14 2,155.98 2,183.12

Page 2 of 3 ends

WWR PRF
(CP) (CP) Total CP PR WW TOTAL
7000 ꞏ Capital Expenses
7400 ꞏ Infrastructure 0.00 38,723.00 38,723.00 0.00 0.00 38,723.00 Total 7000 ꞏ Capital Expenses 0.00 38,723.00 38,723.00 0.00 0.00 38,723.00 Total Expense 27,151.70 166,098.89 193,250.59 58,178.52 78,065.57 329,494.68 Net Ordinary Income 26,848.80 -157,441.89 -130,593.09 -37,627.02 37,769.28 -130,450.83 Net Income 26,848.80 -157,441.89 -130,593.09 -37,627.02 37,769.28 -130,450.83

Page 3 of 3 ends