POINT ARENA CITY COUNCIL

AGENDA ITEM SUMMARY
AGENDA ITEM: VIII C
MEETING DATE: 1/24/2023
TITLE
Structural Analysis of the Point Arena Pier

RECOMMENDED ACTION
Receive presentation, discuss and provide direction

ANALYSIS
The State Lands Commission and the City of Point Arena negotiated a new lease for the tidal waters below Point Arena Pier, which was approved by the City Council on February 27, 2020.

As part of the updated lease, the City of Point Arena was required to conduct a “structural and utility safety assessment” of the Point Arena Pier. At the request of staff, SHN Engineering contracted with Moffatt & Nichol to conduct the study.

In short, the study found significant & serious deficiencies with the boarding float/floating dock and rampway:
“Overall, the boarding float is in ‘serious’ condition with advanced deterioration on widespread portions of the structure that reduce the load capacity of the structure. It’s recommended to replace the boarding float.” Other less dire deficiencies included replacement of pile wraps and pile wrap bands; replacement of fender piles and pile restraints; repair corrosion cracks and spalling of pile caps and deck panels; replacement of guard railing; repair of utility conduits and light pole brackets; replacement of life safety elements including ladders.

Total estimated cost of all repairs is $897,000. Staff have begun conversations with Department of Boating & Waterways for funding through their Boat Launching Facilities grant. However, the funding cycle for us would likely not be available until 2024.

In the interim, serious consideration should be given to the replacement of the floating dock sooner. Estimated cost to replace is approximately $100,000.

FISCAL IMPACT
Estimated cost to replace floating is approximately $100,000. A funding source has not been identified. Other repairs would be dependent on State funding.

ATTACHMENTS
Point Arena Pier Condition Assessment Report – Moffatt & Nicholl, 12/9/2022

CITY MANAGER SIGNATURE
_________________________________
Paul Andersen, City Manager

CITY OF POINT ARENA

POINT ARENA FISHING PIER
Produced For City of Point Arena
December 9, 2022

CONDITION ASSESSMENT
REPORT

Point Arena Fishing Pier Condition Assessment Report | City of Point Arena ii
Document Verification
Revision Description Issued by Date Checked
00 Draft Condition Assessment Report A. Patterson 10/28/2022 M. Perry 01 Final Condition Assessment Report A. Patterson 12/9/2022 M. Perry

Produced by:

Moffatt & Nichol
600 University Street, Suite 610
206-622-0222
www.moffattnichol.com
Client City of Point Arena
Project name Point Arena Fishing Pier Condition Assessment Document title Condition Assessment Report
Document sub-title –
Status Final
Date December 9, 2022
Project number 221782
File reference 221782_Point Arena Fishing Pier_2022 Condition Assessment Report_Final_Rev00.docx Insert
PE
Stamp
and Sig
Point Arena Fishing Pier Condition Assessment Report | City of Point Arena iii
Table of Contents
Document Verification .................................................................................................................................................................... ii Table of Contents ........................................................................................................................................................................... iii List of Figures ................................................................................................................................................................................ iv List of Tables .................................................................................................................................................................................. iv List of Appendices ......................................................................................................................................................................... iv Disclaimer ........................................................................................................................................................................................ v

1. Executive Summary ................................................................................................................................................................ 1

2. Introduction ............................................................................................................................................................................. 2

2.1. Objective and Scope ..................................................................................................................................................... 2

2.2. Facility Description ........................................................................................................................................................ 2

2.3. Previous Inspections ..................................................................................................................................................... 4

2.4. Inspection Methodology ................................................................................................................................................ 4

2.5. Inspection Limitations .................................................................................................................................................... 5

2.6. Rating System ............................................................................................................................................................... 6

3. Observations ........................................................................................................................................................................... 9

3.1. Structural Piles .............................................................................................................................................................. 9

3.2. Fender Piles ................................................................................................................................................................ 14

3.3. Pile Caps ..................................................................................................................................................................... 17

3.4. Deck Panels ................................................................................................................................................................ 19

3.5. Pavement .................................................................................................................................................................... 21

3.6. Guardrails .................................................................................................................................................................... 23

3.7. Boarding Float and Gangway ...................................................................................................................................... 26

3.8. Utilities ......................................................................................................................................................................... 30

3.9. Miscellaneous Appurtenances .................................................................................................................................... 32

4. Evaluation and Recommendations ..................................................................................................................................... 35

4.1. Structural Piles ............................................................................................................................................................ 35

4.2. Fender Piles ................................................................................................................................................................ 35

4.3. Pile Caps ..................................................................................................................................................................... 36

4.4. Deck Panels ................................................................................................................................................................ 36

4.5. Pavement .................................................................................................................................................................... 36

4.6. Guardrails .................................................................................................................................................................... 36

4.7. Boarding Float and Gangway ...................................................................................................................................... 36

4.8. Utilities ......................................................................................................................................................................... 36

4.9. Miscellaneous Appurtenances .................................................................................................................................... 36

5. Opinion of Probable Construction Cost ............................................................................................................................. 37 Point Arena Fishing Pier Condition Assessment Report | City of Point Arena iv
List of Figures
Figure 1: Point Arena Fishing Pier (Source: NOAA 2010) ..................................................................................................... 2 Figure 2: Typical two Pile Bent, Looking west (Source: 1991 pier improvements drawings) ................................................. 3 Figure 3: Typical elevation, Looking south (Source: 1991 pier improvements drawings) ...................................................... 4 List of Tables
Table 1.1: Summary of the ROM Opinion of Probable Construction Cost (USD 2022) ......................................................... 1 Table 2.1: Component Condition Rating Description ............................................................................................................. 6 Table 2.2: Condition Assessment Rating Description ............................................................................................................ 8 Table 3.1: Load-Bearing Timber Pile Condition Summary ................................................................................................... 10 Table 4.1: Summary of the Condition Assessment Ratings ................................................................................................. 35 Table 5.1: Summary of the ROM Opinion of Probable Construction Cost (USD 2022) ....................................................... 37 List of Appendices
Appendix A – Detailed Inspection Observations
Appendix B – Pile Defect Plan
Point Arena Fishing Pier Condition Assessment Report | City of Point Arena v
Disclaimer
Moffatt & Nichol devoted effort consistent with (i) the level of diligence ordinarily exercised by competent professionals practicing in the area under the same or similar circumstances, and (ii) the time and budget available for its work, to ensure that the data contained in this report is accurate as of the date of the inspection.. This study is based on estimates, assumptions and other information developed by Moffatt & Nichol from its independent research effort, general knowledge of the industry, and information provided by and consultations with the client and the client's representatives. No responsibility is assumed for inaccuracies in reporting by the Client, the Client's agents and representatives, or any third-party data source used in preparing or presenting this study. Moffatt & Nichol assumes no duty to update the information contained herein unless it is separately retained to do so pursuant to a written agreement signed by Moffatt & Nichol and the Client.

Moffatt & Nichol’s findings represent its professional judgment. Neither Moffatt & Nichol nor its respective affiliates, makes any warranty, express or implied, with respect to any information or methods disclosed in this document. Any recipient of this document other than the Client, by their acceptance or use of this document, releases Moffatt & Nichol and its affiliates from any liability for direct, indirect, consequential or special loss or damage whether arising in contract, warranty (express or implied), tort or otherwise, and irrespective of fault, negligence and strict liability.

This report may not to be used in conjunction with any public or private offering of securities, debt, equity, or other similar purpose where it may be relied upon to any degree by any person other than the Client.

This study may not be used for purposes other than those for which it was prepared or for which prior written consent has been obtained from Moffatt & Nichol.

Possession of this study does not carry with it the right of publication or the right to use the name of "Moffatt & Nichol" in any manner without the prior written consent of Moffatt & Nichol. No party may abstract, excerpt or summarise this report without the prior written consent of Moffatt & Nichol. Moffatt & Nichol has served solely in the capacity of consultant and has not rendered any expert opinions in connection with the subject matter hereof. Any changes made to the study, or any use of the study not specifically identified in the agreement between the Client and Moffatt & Nichol or otherwise expressly approved in writing by Moffatt & Nichol, shall be at the sole risk of the party making such changes or adopting such use.

This document was prepared solely for the use by the Client. No party may rely on this report except the Client or a party so authorised by Moffatt & Nichol in writing (including, without limitation, in the form of a reliance letter). Any party who is entitled to rely on this document may do so only on the document in its entirety and not on any excerpt or summary. Entitlement to rely upon this document is conditioned upon the entitled party accepting full responsibility and not holding Moffatt & Nichol liable in any way for any impacts on the forecasts or the earnings from the project resulting from changes in "external" factors such as changes in government policy, in the pricing of commodities and materials, price levels generally, competitive alternatives to the project, the behaviour of consumers or competitors and changes in the owners’ policies affecting the operation of their projects.

This document may include “forward-looking statements”. These statements relate to Moffatt & Nichol’s expectations, beliefs, intentions or strategies regarding the future. These statements may be identified by the use of words like “anticipate,” “believe,” “estimate,” “expect,” “intend,” “may,” “plan,” “project,” “will,” “should,” “seek,” and similar expressions. The forward-looking statements reflect Moffatt & Nichol’s views and assumptions with respect to future events as of the date of this study and are subject to future economic conditions, and other risks and uncertainties. Actual and future results and trends could differ materially from those set forth in such statements due to various factors, including, without limitation, those discussed in this study. These factors are beyond Moffatt & Nichol’s ability to control or predict. Accordingly, Moffatt & Nichol makes no warranty or representation that any of the projected values or results contained in this study will actually be achieved.

This study is qualified in its entirety by, and should be considered in light of, these limitations, conditions and considerations.

Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 1 1. Executive Summary
The City of Point Arena (the City) has retained the services of Moffatt & Nichol (M&N) as a subconsultant to SHN Consulting Engineers & Geologists, Inc. (SHN) to provide a condition assessment of the Point Arena Fishing Pier in Point Arena, CA. The scope of work includes an above-water and underwater routine level condition assessment of the structural components (piles, pile caps, deck panels, and other appurtenances) of the approximately 320-foot long pier. The observations noted in the field were evaluated to ascertain a general condition assessment rating for each primary element of the structure, inform the selection of recommended repairs, and support a rough order of magnitude cost estimate for the recommended repairs.

Overall, the structure was in “Fair” condition at the time of the inspection. The majority of the primary structural elements were sound with minor to moderate defects or deterioration; however localized areas of major to severe deterioration were present. It is recommended that the pier be inspected on a four year inspection cycle based on the overall “Fair” condition rating, the construction material (concrete with protected steel piles), and the aggressive marine environment. Repairs are recommended and include:
 Replacement of pile wraps and pile wrap bands
 Replacement of fender piles and pile restraints if not part of current fender system project  Repair corrosion cracks and spalling of pile caps and deck panels  Replacement of guard railing
 Replacement of the boarding float
 Repair of utility conduits and light pole brackets
 Replacement of life safety elements including ladders and life ring cabinets Table 1.1 provides a summary of the rough order of magnitude opinion of probable construction cost for the recommended repairs.

TABLE 1.1: SUMMARY OF THE ROM OPINION OF PROBABLE CONSTRUCTION COST (USD 2022) Item Quantity Unit Unit Cost Subtotal
Replace Pile Wrap 9 EA $7,500 $67,500
Replace Pile Wrap Stainless Bands 6 EA $2,500 $15,000
Replace Fender Pile 8 EA $10,000 $80,000
Replace Fender Pile Restraint Bracket 1 EA $500 $500
Repair Pile Cap 150 SF $500 $75,000
Repair Deck Panel 1,000 SF $500 $500,000
Replace Guardrail (Posts, Rails, and Brackets) 350 LF $100 $35,000 Replace Boarding Float 1 EA $100,000 $100,000
Repair Conduits 1 LS $1,000 $1,000
Replace Light Pole Brackets 2 EA $500 $1,000
Replace Ladders 3 EA $7,5000 $22,500
Replace Life Ring Ropes 1 EA $100 $100
Total $897,600
Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 2 2. Introduction

2.1. Objective and Scope
The City of Point Arena (the City) retained the services of Moffatt & Nichol (M&N) as a subconsultant to SHN Consulting Engineers & Geologists, Inc. (SHN) to provide a condition assessment of the Point Arena Fishing Pier in Point Arena, CA. The scope of work includes an above-water and underwater routine level condition assessment of the structural components (piles, pile caps, deck panels, and other appurtenances) of the approximately 320-foot long pier. The observations noted in the field were evaluated to ascertain a general condition assessment rating for each primary element of the structure, inform the selection of recommended repairs, and support a rough order of magnitude cost estimate for the recommended repairs.

2.2. Facility Description
A plan view of the existing pier is shown in Figure 1. The pier measures approximately 320-feet-long by 28- feet-wide. The pier consists of 37 steel pipe piling which support precast concrete pile caps, precast concrete deck panels, an asphalt pavement slab, and additional appurtenances including guardrails, ladders, utilities, and a gangway that provides access to a boarding float.

FIGURE 1: POINT ARENA FISHING PIER (SOURCE: NOAA 2010)

Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 3 The pier was originally built in 1985 and repairs were performed in 1991. The 1991 repairs included installation of a protective pile wrap system over the structural piles. Pile wrap systems are typically installed to prevent corrosion of steel piles. In addition to the pile wrap system, rubber sleeves were installed over the structural piles.

The pier is supported by steel pipe pile bents, with average spacing of 20-feet between bents and 16.5- feet between pile rows. Typical bents consist of two steel piles with a concrete pile cap. Bent 5 through Bent 7 each consist of three steel piles. Pile bent numbering is from the landside (east) end of the pier, starting at Bent 1 and continuing sequentially through Bent 17 at the offshore (west) end of the pier. Pile rows are typically labelled alphabetically starting with “A” for the southern pile through “B” for the northern pile. Pile Bent 5 through 7 have an additional row of piling, referenced as row C. Figure 2 shows a typical section view of the pier. Figure 3 shows a partial elevation view of the pier, looking south at the boarding float location.

FIGURE 2: TYPICAL TWO PILE BENT, LOOKING WEST (SOURCE: 1991 PIER IMPROVEMENTS DRAWINGS) Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 4 FIGURE 3: TYPICAL ELEVATION, LOOKING SOUTH (SOURCE: 1991 PIER IMPROVEMENTS DRAWINGS)

2.3. Previous Inspections
Previous inspections of the pier have not been provided.

2.4. Inspection Methodology
The above-water and underwater investigation methodology was based on the ASCE Manuals and Reports on Engineering Practice Number 130, "Waterfront Facilities Inspection and Assessment", 2015 Edition (ASCE 130). ASCE 130 provides guidance on types of inspections and specific structure considerations depending on objectives, frequency of inspection, and the level of damage.

M&N conducted the above-water and underwater investigations from the pier in September 2022. M&N’s Engineer-Divers conducted the investigation in accordance with OSHA regulations and Association of Diving Contractors International (ADCI) standards.

Three levels of inspection are typically used for inspecting underwater marine facilities. The type and extent of damage/deterioration that can be detected depends on the level of inspection performed. The following general descriptions for Levels I through III comply with ASCE 130. This underwater investigation included Level I and Level II inspection of timber piling and excluded Level III inspection. Level III inspections were performed above-water on a limited basis to determine the extent of section loss of structural elements.

Level I - Visual or tactile inspection of underwater components without the removal of marine growth. This level of investigation generally serves as a confirmation of as-built conditions and detects obvious damage or deterioration to the structure.

Level II - Partial marine growth removal of a statistically representative sample – for piling, this is typically ten percent of the visually inspected piles. The procedure requires that removal occur at three distinct one-foot-wide bands. The bands are located near the mudline, at mid-depth, and Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 5 near mean lower low water (MLLW). This level of investigation is intended to detect and identify damage and deterioration that may be hidden by surface biofouling.

Level III - Non-destructive testing (NDT) or partially destructive testing (PDT) of a statistically representative sample. These procedures are often conducted as part of a more comprehensive inspection program to detect any hidden internal damage or deterioration.

2.5. Inspection Limitations
The existing steel pipe pile piles supporting the pier are wrapped in a combination of a protective pile wrap system and rubber sleeves extending, typically, from the pile cap to the mudline which inhibits the ability to fully observe the condition of the steel piles. The pile wrap system was not removed as part of this inspection. As a result, the steel piles may have significant interior corrosion damage. Such damage and deterioration is difficult to detect without removal of the pile wrap system. The observations and findings within this report are based on the engineering expertise and field experience of the inspection team regarding deterioration of steel elements in the marine environment; however, it should be expected that because this inspection did not involve disassembly to expose possible hidden deterioration, additional deterioration will be discovered during maintenance or repairs which may necessitate additional repairs.

Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 6 2.6. Rating System
Individual structural components were categorized into six condition ratings based on the visual and tactile observations. M&N’s component rating definitions, based on ASCE 1301, are shown in Table 2.1.

TABLE 2.1: COMPONENT CONDITION RATING DESCRIPTION

COMPONENT

RATING DESCRIPTION
Not Inspected (NI) Component was inaccessible or not included in the scope.

No Damage (ND) Component had a sound material surface.

Minor (MN) Timber: Checks, splits, and gouges less than 0.5 inches wide.

Concrete: Mechanical abrasion or impact dents; general cracks up to 1/16-inch wide; occasional corrosion stain or small pop-out corrosion spall.

Steel: Protective coating or wrap damaged and loss of thickness up to 15% of nominal at any location; less than 50% of perimeter or circumference affected by corrosion at any elevation or cross-section; loss of thickness up to 15% of nominal thickness at any location.

Moderate (MD) Timber: Checks and splits greater than 0.5 inches wide; diameter loss up to 15%; cross-section area loss up to 25%; corroded hardware; marine borer infestation.

Concrete: Structural cracks up to 1/16-inch wide; corrosion cracks up to ¼-inch wide; chemical deterioration; random cracks up to 1/16-inch wide; soft concrete and rounding corners up to 1-inch deep; frequent corrosion stain or medium popout corrosion spall.

Steel: Protective coating or wrap damaged and loss of thickness 15 to 30% of nominal at any location; more than 50% of perimeter or circumference affected by corrosion at any elevation or cross-section; loss of thickness 15% to 30% of nominal at any location
Major (MJ) Timber: Checks and splits through full depth of cross-section; diameter loss 15% to 30%; cross-section loss 25% to 50%; heavily corroded hardware; displacement, misalignments at connections.

Concrete: Structural cracks 1/16-inch to 1/4-inch wide; partial breakage (spalls); corrosion cracks greater than 1/4-inch wide; multiple cracking and disintegration of surface due to chemical deterioration.

Steel: Protective coating or wrap damaged and loss of nominal thickness 30% to 50% at any locations; partial loss of flange edges or visible reduction of wall thickness on pipe piles; loss of nominal thickness 30% to 50% at any location 1 Damage Rating Descriptions from ASCE Manuals and Reports on Engineering Practice Number 130, "Waterfront Facilities Inspection and Assessment" (ASCE 130), Table 2-4and Table 2-6 Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 7 TABLE 2.1: COMPONENT CONDITION RATING DESCRIPTION

COMPONENT

RATING DESCRIPTION
Severe (SV) Timber: Diameter loss greater than 30%; cross-section area loss greater than 50%; loss of connections and/or fully non-bearing; partial or complete breakage.

Concrete: Structural cracks greater than 1/4-inch wide; breakage; loss of bearing and displacement at connections; reinforcing steel w/cover loss and greater than 30% diameter loss for any main bar; exposed steel due to chemical deterioration; cross section loss greater than 30% of any component for any reason.

Steel: Protective coating or wrap damaged and loss of wall thickness exceeding 50% of nominal at any location; structural bends or buckling, breakage and displacement at supports, loose or lost connections; loss of wall thickness exceeding 50% of nominal at any location

Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 8 Overall Condition Assessment Ratings (CAR), as defined by ASCE 1302, are assigned to each structure and primary component. The CARs are based on the findings of the visual and tactile observations. The condition assessment scale includes the six categories described in Table 2.2.

TABLE 2.2: CONDITION ASSESSMENT RATING DESCRIPTION

CAR DESCRIPTION
''Good''
No visible damage or only minor damage noted. Structural elements may show very minor deterioration, but no overstressing observed.

No repairs are required.
''Satisfactory''
Limited minor to moderate defects or deterioration observed but no overstressing observed.

No repairs are required.
''Fair''
All primary structural elements are sound but minor to moderate defects or deterioration observed. Localized areas of moderate to advanced deterioration may be present but do not significantly reduce the loadbearing capacity of the structure.

Repairs are recommended, but the priority of the recommended repairs is low. ''Poor''
Advanced deterioration or overstressing observed on widespread portions of the structure but does not significantly reduce the load-bearing capacity of the structure.

Repairs may need to be carried out with moderate urgency. ''Serious''
Advanced deterioration, overstressing, or breakage may have significantly affected the load-bearing capacity of primary structural components. Local failures are possible and loading restrictions may be necessary.

Repairs may need to be carried out on a high-priority basis with urgency. ''Critical''
Very advanced deterioration, overstressing, or breakage has resulted in localized failure(s) of primary structural components. More widespread failures are possible or likely to occur, and load restrictions should be implemented as necessary.

Repairs may need to be carried out on a very high-priority basis with strong urgency. 2 CAR Descriptions from ASCE Manuals and Reports on Engineering Practice Number 130, "Waterfront Facilities Inspection and Assessment" (ASCE 130), Table 2-14 Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 9 3. Observations
The following section is a summary of the observations noted in the field. A complete compilation of the field notes is provided in Appendix A and are shown graphically in Appendix B.

3.1. Structural Piles
The structural piles consist of steel pipe piles measuring 16-inches and 18-inches in diameter. The piles are protected by a pile wrap system consisting of an outer polyethylene wrap protecting an inner petrolatum tape. The petrolatum tape is wrapped around the steel pile and is intended to prevent corrosion of the steel pile. The outer wrap is secured in place by stainless steel bands at 18-inch spacing. The pile wrap system was installed in approximately 1991 based on available record drawings. The pile wrap system extends from the top of the pile (at the pile cap soffit) to approximately -6ft MLLW. Rubber sleeves, measuring approximately two-inches thick have been installed around each pile below the pile wrap system and extend to the mudline. Photo 1 shows a typical pile bent.

PHOTO 1: TYPICAL PILE BENT (BENT 2) LOOKING EAST

Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 10 The piles typically exhibited minor to major damage consisting of torn and missing wraps, missing stainless steel bands, and corrosion of the steel piling. Photo 2 through Photo 8 show representative photos of the observed damage and deterioration.

Minor damage, including missing stainless steel bands and small gaps between the pile wrap system and the pile cap, is present on 10 of the 37 structural piles (27-percent).

Moderate damage, including holes in the pile wrap outer shell, areas of missing wrap in the intertidal zone, gaps between the pile wrap system and the rubber sleeves underwater, exposed petrolatum tape, is present on 19 of the 37 structural piles (51-percent).

Major damage, including areas of missing wrap in the intertidal zone with corrosion, is present on three of the 37 structural piles (Pile 5:A, Pile 9:B, and Pile 10:B).

A summary of the structural pile condition ratings is provided in Table 3.1. A pile defect plan is provided in Appendix B.

TABLE 3.1: LOAD-BEARING TIMBER PILE CONDITION SUMMARY
Total ND MN MD MJ SV
Structural Pile 37 5 10 19 3 0
Total 14% 27% 51% 8% 0%
PHOTO 2: TYPICAL DAMAGED PILE WRAP (PILE 17:A)
Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 11 PHOTO 3: MISSING PILE WRAP (RED ARROW) AT PILE 15:B
PHOTO 4: MISSING PILE WRAP AND CORROSION OF STEEL PILE (PILE 5:A) Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 12 PHOTO 5: TORN AND MISSING PILE WRAP. CORROSION OF STEEL PILE (PILE 10:B) PHOTO 6: TYPICAL PILE WRAP UNDERWATER WITH STAINLESS STEEL BAND Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 13 PHOTO 7: EXPOSED AREA OF PILE (RED ARROW) BELOW RUBBER SLEEVE PHOTO 8: MISSING PILE WRAP AND CORROSION PITTING UNDERWATER (PILE 10:B) Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 14 3.2. Fender Piles
Timber fender piles are located along isolated areas of the pier and nominally measure 14-inch in diameter.

The fender piles are secured to the pier with u-bolts and steel brackets anchored to the soffit of the deck panels. During the time of this inspection a fender pile replacement project was underway. Several of the deficiencies noted herein may be addressed by that project.

The piles typically exhibited minor to severe damage. Minor damage observed includes weathering and abrasion of the outer faces of the fender piles, predominantly in the intertidal and splash zone. Moderate damage is present on a limited number of fender piles and consists of abrasion with section loss up to 15- percent of the diameter of the pile. Ten fender piles are missing and, for the purpose of this report, are rated as having severe damage. The location of the missing piles are between pile Bent 6 through Bent 8 on the south side of the pier, Bent 10.8:South, Pile 15.8:North, Pile 16.3:North, and Pile 16.5:North.

Eight fenders piles that have been recently installed have been wrapped with polyethelyne. It is likely that the polyethylene wraps will tear from regular use by berthed vessels.

Steel brackets connect the fender piles to the deck panels. Typically, the steel brackets exhibit minor corrosion, however, three brackets exhibit moderate corrosion. Additionally, the anchor bolt connecting the bracket to the deck panel was observed broken at one location (Bent 13.5:South).

Photo 9 through Photo 13 show representative photos of the observed damage and deterioration to the fender piles and fender pile brackets.

PHOTO 9: TYPICAL FENDER PILES AT BENT 15
Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 15 PHOTO 10: CREOSOTE TREATED FENDER PILE WITH MINOR ABRASION AT BENT 11.3 PHOTO 11: FENDER PILE WITH MODERATE SECTION LOSS FROM ABRASION AT BENT 15.5 Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 16 PHOTO 12: CORRODED FENDER PILE BRACKET AND BROKEN U-BOLT PHOTO 13: BROKEN FENDER PILE BRACKET ANCHOR BOLT AND BENT U-BOLT Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 17 3.3. Pile Caps
The pile caps consist of 48-inch wide by 21-inch deep precast elements. The pile caps typically exhibit minor to major deterioration most predominantly on the landward half of the pier between Bent 2 and Bent

9. The observed deterioration includes corrosion cracking along the lower corners of the pile caps and areas of cracking and delaminations on the soffit of the pile caps. Seven of the 17 pile caps exhibit no damage, whereas nine pile caps between Bent 2 and Bent 11 exhibit moderate corrosion cracks up to 1/4- inch wide. One pile cap (Bent 4) exhibits major corrosion cracks with exposed reinforcing bars. Photo 14 through Photo 16 show representative photos of the observed damage and deterioration to the pile caps.

PHOTO 14: PILE CAP WITH NO OBSERVED DAMAGE (BENT 12)
Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 18 PHOTO 15: PILE CAP AT BENT 9 WITH MODERATE CORROSION CRACKS (RED ARROWS) PHOTO 16: BENT 4 PILE CAP WITH MAJOR CORROSION CRACKS AND EXPOSED REINFORCING (RED ARROW) Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 19 3.4. Deck Panels
The deck panels consist of 12-inch thick by 66-inch wide precast concrete elements that span full length between pile caps. Typically, the deck panels exhibit moderate to major deterioration most predominantly on the landward half of the pier between Bent 1 and Bent 11. The observed deterioration includes corrosion cracking and delamination of the surface layer of concrete on the soffit of the deck panels. Twenty-six of the 80 deck panels exhibit no damage. These deck panels are all located between Bent 10 and Bent 17.

Although visually observable damage is not present on these deck panels, it is likely that chloride ion intrusion of the concrete matrix has occurred and has initiated corrosion of the reinforcing. Cracking is not evident at this time, however, is likely to become evident in the next 10 years.

Forty-two deck panels exhibit moderate corrosion cracks up to 1/4-inch wide and extensive delamination of the deck panel soffit. Eleven deck panels exhibit major corrosion cracks and delamination with exposed reinforcing bars. The deck panels with major deterioration are located nearshore between Bent 1 and Bent

5. The concrete elements in this area of the pier experience greater amounts of salt-water spray and splashing and deteriorate at a more accelerated rate than other areas of the pier. Photo 17 through Photo 19 show representative photos of the observed damage and deterioration to the pile caps.

PHOTO 17: DECK PANEL WITH NO DAMAGE (BENT 16/17 PANEL 1) Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 20 PHOTO 18: DECK PANEL WITH MODERATE DAMAGE
PHOTO 19: DECK PANEL 5 BETWEEN BENTS 4 AND 5 WITH MAJOR DAMAGE (EXPOSED REINFORCING) Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 21 3.5. Pavement
The pavement surface consists of an asphalt concrete overlay. The pavement generally exhibits isolated areas of minor gouges and pitting up to one inch deep. In one location, near Bent 13.5, an area of the pavement has been removed. The removal of the asphalt allows rain water to more readily infiltrate onto the deck panels below. Although the deck panels in this location exhibit no deterioration, the pavement should be replaced. Additionally, at Bent 12, a hole through the pavement and deck is present. This is presumably from an abandoned utility penetration. The hole is not a structural deficiency; however, it may pose as a tripping hazard. Photo 20 through Photo 22 show representative photos of the pavement.

PHOTO 20: TYPICAL CONDITION OF PAVEMENT, LOOKING WEST AT BENT 7 Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 22 PHOTO 21: EXPANSION JOINT AT BENT 4
PHOTO 22: HOLE IN PAVEMENT AT BENT 12
Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 23 3.6. Guardrails
The guardrails consist of 6x6 dimensional timber posts, 3x6 dimensional timber rails, and a 3x10 dimensional timber handrail. The posts are secured to the pier with steel post brackets and connection hardware. Typically, the guardrail posts and brackets exhibit moderate to severe deterioration throughout the pier. The observed deterioration includes split post bases and corroded brackets and bracket connection hardware. Of the approximately 100 timber posts and post brackets, 70 posts and brackets exhibit major to severe deterioration and require replacement. The timber rails typically exhibit moderate weathering, loose connections to the posts, and moderate splits up to ½-inch wide. Additionally, at Bent 4, a gap between adjacent rail segments measuring approximately 11-inches is present and poses a fall hazard. This location coincides with an expansion joint so any repairs performed to reduce the gap need to account for movement of the joint. Photo 23 through Photo 27 show representative photos of the observed damage and deterioration to the guardrail.

PHOTO 23: TYPICAL GUARDRAIL
Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 24 PHOTO 24: BROKEN GUARDRAIL POST AND BROKEN BRACKET
PHOTO 25: SPLIT GUARDRAIL POST AND BROKEN BRACKET
Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 25 PHOTO 26: MIDRAIL WITH LOOSE/BROKEN CONNECTIONS (RED ARROWS) PHOTO 27: GAP BETWEEN RAIL SEGMENTS AT BENT 4 EXPANSION JOINT Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 26 3.7. Boarding Float and Gangway
The boarding float is located between Bent 10 and 12 on the north side of the pier and measures approximately 28-feet long by eight feet wide. The float is a welded aluminum framed structure supported by polyethylene floatation barrels. The float is held in place by two steel guide piles. Access to the boarding float from the pier deck is provided by an aluminum gangway measuring approximately four feet wide by 80-feet long.

Typically, the boarding float exhibits moderate to severe deterioration including corrosion of the aluminium framing elements and holes in the decking. The corrosion of the framing elements is most severe on the outer longitudinal beams, near the bolted connections for the lifting padeyes. The corrosion has likely reduced the load capacity of the float and reduced its ability to sustain the original design loads. The lifting padeyes were previously used for lifting the boarding float out of the water during periods of rough weather, but have been abandoned due to the deterioration of the frame. The steel guide piles exhibit minor to moderate corrosion. The western guide pile has been recently replaced and exhibits minor corrosion whereas the eastern guide pile exhibits moderate corrosion. The gangway typically exhibits minor deterioration including isolated areas of impact damage and small holes in the walking surface. Photo 28 through Photo 34 show representative photos of the observed damage and deterioration to the boarding float and gangway.

PHOTO 28: BOARDING FLOAT AND GANGWAY, LOOKING SOUTHEAST Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 27 PHOTO 29: BOARDING FLOAT FRAMING MEMBER WITH SEVERE SECTION LOSS PHOTO 30: BOARDING FLOAT DECK WITH HOLES (RED ARROWS)
Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 28 PHOTO 31: WEST GUIDE PILE WITH CORROSION
PHOTO 32: EAST GUIDE PILE WITH MODERATE CORROSION AND SECTION LOSS Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 29 PHOTO 33: GANGWAY
PHOTO 34: HOLES IN GANGWAY WALKING SURFACE (RED ARROW)
Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 30 3.8. Utilities
The utilities located on the pier include water, power, and sewer. The utilities are primarily routed beneath the pier, supported by steel utility hangers suspended from the deck panels. Typically, the utilities exhibit minor to moderate damage with isolated locations of broken conduits and/or conduits with separated fittings. The utility hangers exhibit minor to moderate corrosion. In two locations, Bent 15:South and Bent 17:West, the light pole has been removed. Photo 35 through Photo 38 show representative photos of the observed damage and deterioration of the utilities.

PHOTO 35: TYPICAL UTILITIES BENEATH PIER
Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 31 PHOTO 36: TYPICAL UTILITY BRACKET WITH MINOR CORROSION PHOTO 37: BROKEN UTILITY CONDUIT AT BENT 12.3
Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 32 PHOTO 38: BROKEN LIGHT POLE AT BENT 15

3.9. Miscellaneous Appurtenances
The miscellaneous appurtenances on the pier included in the condition assessment include life safety items (ladders and life ring cabinets) and mooring hardware (cleats). Additional items located on the pier that are not included as part of this inspection are the hoists and harbor master building.

Typically, the ladders exhibit moderate to severe damage and deterioration. Three of the five ladders present on the pier exhibit severe corrosion and are broken. The remaining two ladders exhibit moderate corrosion on the ladder rails and attachment brackets. The life ring cabinets exhibit minor deterioration of the fiberglass cabinet. The rope life ring cabinet at Bent 16 is missing the rope that is typically connected to the life ring. Typically, the cleats located along the perimeter of the pier exhibit moderate to major corrosion and deterioration. Photo 39 through Photo 42 show representative photos of the observed damage and deterioration of the ladders, life rings, and cleats.

Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 33 PHOTO 39: TYPICAL LADDER
PHOTO 40: BROKEN LADDER AT BENT 13
Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 34 PHOTO 41: TYPICAL LIFE RING CABINET
PHOTO 42: TYPICAL CLEAT

Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 35 4. Evaluation and Recommendations
Based on the findings of the visual and tactile observations, an overall Condition Assessment Rating (CAR) has been assigned to each of the primary elements. The CARs and descriptions are provided in Table 2.2 of this report. Overall, the pier was in “Fair” condition at the time of the inspection. The majority of the primary structural elements were sound with minor to moderate defects or deterioration; however localized areas of major to severe deterioration were present. A summary of the CARs for each of the primary elements is provided in Table 4.1
TABLE 4.1: SUMMARY OF THE CONDITION ASSESSMENT RATINGS
Primary Element CAR
Structural Piles Fair
Fender Piles Fair
Pile Caps Fair
Deck Panels Poor
Pavement Satisfactory
Guardrails Poor
Boarding Float and Gangway Serious
Utilities Fair
Miscellaneous Appurtenances Poor
Overall Fair
In addition to the following repairs, it is recommended that the pier be inspected on a four-year inspection cycle based on the overall “Fair” condition rating, the construction material (concrete with protected steel piles), and the aggressive environment.

4.1. Structural Piles
Overall, the structural piles are in “fair” condition. All primary elements are sound, but minor to moderate defects are present with localized areas of advanced deterioration. The following repairs are recommended:
 Replace wraps on nine piles (approximately 10 LF of wrap per pile)  Replace missing bands on six piles (approximately 5 new bands per pile) During replacement of the pile wraps noted above, it is recommended that the exposed steel piles be inspected to further document the condition and effectiveness of the pile wrap system.

4.2. Fender Piles
Overall, the fender piles are in “fair” condition. All primary elements are sound, but minor to moderate defects are present with localized areas of advanced deterioration. It’s recommended that the eight missing fender piles are replaced along with the fender pile bracket with a broken anchor bolt. Some of these repairs may be addressed by the current fender system repair project that was in progress during the inspection.

Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 36 4.3. Pile Caps
Overall, the pile caps are in “fair” condition with minor to moderate defects or deterioration observed, and localized areas of moderate to advanced deterioration present that do not significantly reduce the loadbearing capacity of the structure. It’s recommended that the corrosion cracks on the Bent 4 pile cap be repaired.

4.4. Deck Panels
Overall, the deck panels are in “poor” condition with advanced deterioration on widespread portions of the structure but does not significantly reduce the load-bearing capacity of the structure. It’s recommended that the deck panels with major corrosion cracking and delamination (approximately 1000 sf) are repaired.

4.5. Pavement
Overall, the pavement is in “satisfactory” condition with limited minor to moderate defects or deterioration observed. No repairs are recommended at this time.

4.6. Guardrails
Overall, the guardrails are in “poor” condition with advanced deterioration on widespread portions of the structure but does not significantly reduce the load-bearing capacity of the structure. It’s recommended to replace the guardrail post brackets (approximately 70), posts (approximately 70), and railing (approximately 350 LF) that exhibit major to severe deterioration.

4.7. Boarding Float and Gangway
Overall, the boarding float is in “serious” condition with advanced deterioration on widespread portions of the structure that reduce the load capacity of the structure. It’s recommended to replace the boarding float.

4.8. Utilities
Overall, the utilities are in “fair” condition with minor to moderate defects or deterioration observed, and localized areas of moderate to advanced deterioration present. It’s recommended to repair the conduits with broken or separated fittings and to replace/repair the broken light pole brackets and reinstall the light poles.

4.9. Miscellaneous Appurtenances
Overall, the ladders, life ring cabinets and cleats are in “poor” condition with advanced deterioration on widespread portions of the elements. It’s recommended to replace three ladders, replace the missing life ring rope, and to replace the two cleats with major corrosion if they are to be returned to service.

Point Arena Fishing Pier Condition Assessment Report | City of Point Arena 37 5. Opinion of Probable Construction Cost
The rough order of magnitude (ROM) opinion of probable construction cost (OPCC) for the recommended repairs, is approximately $897,600. A summary of the costs is provided below in Table 5.1. The unit costs shown in Table 5.1 include contractor overhead and profit, mobilization and demobilization, a 30-percent contingency, and local tax. Engineer design services, environmental and city permitting, and construction administration are excluded. The unit costs assume that the repairs would be performed by a single contractor under a standalone contract. If the recommended repair items are constructed separately additional costs will likely be incurred to account for additional mobilization and demobilization and other indirect costs.

TABLE 5.1: SUMMARY OF THE ROM OPINION OF PROBABLE CONSTRUCTION COST (USD 2022) Item Quantity Unit Unit Cost Subtotal
Replace Pile Wrap 9 EA $7,500 $67,500
Replace Pile Wrap Stainless Bands 6 EA $2,500 $15,000
Replace Fender Pile 8 EA $10,000 $80,000
Replace Fender Pile Restraint Bracket 1 EA $500 $500
Repair Pile Cap 150 SF $500 $75,000
Repair Deck Panel 1,000 SF $500 $500,000
Replace Guardrail (Posts, Rails, and
Brackets)
350 LF $100 $35,000
Replace Boarding Float 1 EA $100,000 $100,000
Repair Conduits 1 LS $1,000 $1,000
Replace Light Pole Brackets 2 EA $500 $1,000
Replace Ladders 3 EA $7,500 $22,500
Replace Life Ring Ropes 1 EA $100 $100
Total $897,600
In providing opinions of construction cost, it is recognized that the consultant has no control over the cost of labor, equipment, materials or over the contractor’s means and methods of determining constructability, pricing, or schedule. The opinion of construction cost is based on the consultant’s reasonable professional judgement and experience and does not constitute a warranty, express or implied, that the contractor’s bids, negotiated prices, or actual execution of the work will not vary from the OPCC.

The OPCC, as prepared by M&N, is for a specific purpose and specific project using the standard care prevailing at the time the work was done and is provided for information only. The OPCC reflects M&N’s best judgment in light of the information available at the time of preparation. Any use which a third party makes of this report, or any reliance on or decisions to be made based on it, are the responsibility of such third parties. M&N accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this report.

Point Arena Fishing Pier Condition Assessment Report | City of Point Arena A-1
Appendix A

DETAILED INSPECTION OBSERVATIONS
PILE NO. GAGE DEPTH ELEV (MLLW) SIDE(1) HGT WIDTH DEPTH NI ND MN MD MJ SV A X 12 16 X Corrosion (COR)B X 12 16 X CORAX X Rubber sleeve, COR below sleeveBX X Rubber sleeve, COR below sleeveAX X Rubber sleeve, COR below sleeveBX X Rubber sleeve, COR below sleeve. . Missing bands at top of wrap AX X
Wrapped. Protective steel shell at base
BX X
Wrapped. Protective steel shell at base. Gap between wrap and pilecap X III 0.365 X

0.3500.360
X +5 X
Missing stainless steel bands, 3 totalGap between wrap and pilecapRubber sleeve below water CX X Gap between wrap and pilecap
X III +15 0.375 X

0.3700.370
X X Gap between wrap and pilecap
Rubber sleeve below water
CX X Gap between wrap and pilecap
Rubber sleeve below water
6B
Gap between segments of wrap, exposed petrolatum tape, missing wrap +4 to -1ft, minor corrosion at missing wrap location. Rubber sleeve -1ft to ML. ML =-6ftGap between wrap and pilecapRubber sleeve from +2ft to -3ftML = -3ft. Wrap missing from +7 to +2Minor Corrosion on Pile INSPN
LEVEL
I (u.o.n.);
II
(T/M/B);
TIME
& / OR
TIDE
(MLLW)
CP? Other?
12 BATTER?

WRAPPED
1 5B
3 □ SHEET PILES□ FENDER PILES
RECORDER: A. Patterson DIVERS/INSP'RS: M. Perry / N. Colson

COMMENTS
5344
65 INSPECTION RECORD - STEEL PILES

PILE LOCATION
(&/or: ID NO.; STA)
BENT
NO.
2 LOCATION ON PILE DIMENSIONS UT (2)
RDG
(inch)
ELEC
POT'L
(3)

PILE CONDITION RATING OBSERVATION / DAMAGE
DATE: _9/20/22 & 9/21/22__ JOB NO: 221782 SHT NO.: __ X ABOVE WATER X UNDERWATER LOCATION: Point Arena TERMINAL / BERTH NO.: Fishing Pier

XSTANDARD PILES
A
6A
PILE NO. GAGE DEPTH ELEV (MLLW) SIDE(1) HGT WIDTH DEPTH NI ND MN MD MJ SV INSPN
LEVEL
I (u.o.n.);
II
(T/M/B);
TIME
& / OR
TIDE
(MLLW)
CP? Other?
BATTER?

WRAPPED
□ SHEET PILES□ FENDER PILES
RECORDER: A. Patterson DIVERS/INSP'RS: M. Perry / N. Colson

COMMENTS

INSPECTION RECORD - STEEL PILES

PILE LOCATION
(&/or: ID NO.; STA)
BENT
NO.

LOCATION ON PILE DIMENSIONS UT (2)
RDG
(inch)
ELEC
POT'L
(3)

PILE CONDITION RATING OBSERVATION / DAMAGE
DATE: _9/20/22 & 9/21/22__ JOB NO: 221782 SHT NO.: __ X ABOVE WATER X UNDERWATER LOCATION: Point Arena TERMINAL / BERTH NO.: Fishing Pier

XSTANDARD PILES
X X Gap between wrap and pilecap
Rubber sleeve below water
X X Gap between wrap and pilecap
Rubber sleeve below water
CX X
Gap between wrap and pilecapRubber sleeve below water. 2ft exposed steel pile below sleeve. Minor corrosion X X Gap between wrap and pilecap
Rubber sleeve below water
X +7 X Missing stainless steel bands, 3 total
Rubber sleeve below water
X X Missing stainless steel bands, 5 total
Rubber sleeve below water
X X Missing wrap at top of pile
Wrap missing from +7 to -1ftCorrosion on exposed portions of pileRubber sleeve ftom -1ft to MLML = -7ft X II X Missing stainless steel bands, 3 total
Rubber sleeve below waterML=-8ft
B X +3 X
Missing wrap from '+6 to -2ft, Corrosion on exposed steelRubber sleeve -2ft to MLML=-7ft AX X Rubber Sleeve below waterBX X
Missing wrap at top of pile, exposed petrolatum tapeRubber sleeve below water AX X Rubber Sleeve below waterBX X Rubber Sleeve below water A
10 A
7B
B
9A8B8
7 97
1111121210
A
PILE NO. GAGE DEPTH ELEV (MLLW) SIDE(1) HGT WIDTH DEPTH NI ND MN MD MJ SV INSPN
LEVEL
I (u.o.n.);
II
(T/M/B);
TIME
& / OR
TIDE
(MLLW)
CP? Other?
BATTER?

WRAPPED
□ SHEET PILES□ FENDER PILES
RECORDER: A. Patterson DIVERS/INSP'RS: M. Perry / N. Colson

COMMENTS

INSPECTION RECORD - STEEL PILES

PILE LOCATION
(&/or: ID NO.; STA)
BENT
NO.

LOCATION ON PILE DIMENSIONS UT (2)
RDG
(inch)
ELEC
POT'L
(3)

PILE CONDITION RATING OBSERVATION / DAMAGE
DATE: _9/20/22 & 9/21/22__ JOB NO: 221782 SHT NO.: __ X ABOVE WATER X UNDERWATER LOCATION: Point Arena TERMINAL / BERTH NO.: Fishing Pier

XSTANDARD PILES
AX X
+1ftTape from +1 fot -4ftRubber sleeve -4ft to ML ML = -9ftRubber sleeve ftom -1ft to ML BX X Rubber Sleeve below waterAX X
Rubber sleeve from -6ft to -11ftML = -11ft.

X II +12 X
Gap between segments of wrap, exposed petrolatum tapeOuter wrap missing from 0ft to -5ftRubber sleeve from -6ft to -10ft1ft gap between wrap and sleeve. No corrosion. ML = -10ft X X
Rubber sleeve from -6ft to -9ftML = -10ft. Minor Corrosion on Pile X +15 X
Gap between segments of wrap, exposed petrolatum tapeRubber sleeve from -6ft to -10ft B ML = -10ft.
15 A14 B15
131413
PILE NO. GAGE DEPTH ELEV (MLLW) SIDE(1) HGT WIDTH DEPTH NI ND MN MD MJ SV INSPN
LEVEL
I (u.o.n.);
II
(T/M/B);
TIME
& / OR
TIDE
(MLLW)
CP? Other?
BATTER?

WRAPPED
□ SHEET PILES□ FENDER PILES
RECORDER: A. Patterson DIVERS/INSP'RS: M. Perry / N. Colson

COMMENTS

INSPECTION RECORD - STEEL PILES

PILE LOCATION
(&/or: ID NO.; STA)
BENT
NO.

LOCATION ON PILE DIMENSIONS UT (2)
RDG
(inch)
ELEC
POT'L
(3)

PILE CONDITION RATING OBSERVATION / DAMAGE
DATE: _9/20/22 & 9/21/22__ JOB NO: 221782 SHT NO.: __ X ABOVE WATER X UNDERWATER LOCATION: Point Arena TERMINAL / BERTH NO.: Fishing Pier

XSTANDARD PILES
X +4 X
Holes in wrap, Corrosion visible beneath wrap, gap between top of wrap and pile capRubber sleeve from -6ft to -11ft ML = -12ft. No corrosion on exposed pile X II +5 X
Tide Gauge attached to pile. Torn wrap with exposed petrolatum tapeRubber sleeve from -6ft to -11ft ML = -12ft. No corrosion on exposed pileMissing bands from 0ft to -5ft(4 total missing) X +4 X
Holes in wrap, Corrosion visible beneath wrap, gap between top of wrap and pile capRubber sleeve from -6ft to -11ft ML = -12ft. No corrosion on exposed pileMissing bands from 0ft to -6ft(4 total) X +15 X
Gap between top of wrap and pile capRubber sleeve from -6ft to -11ft ML = -12ft. No corrosion on exposed pileMissing bands from 0ft to -5ft B (4 total)A
16 B16 A1717
PILE NO. GAGE DEPTH ELEV (MLLW) SIDE(1) HGT WIDTH DEPTH NI ND MN MD MJ SV INSPN
LEVEL
I (u.o.n.);
II
(T/M/B);
TIME
& / OR
TIDE
(MLLW)
CP? Other?
BATTER?

WRAPPED
□ SHEET PILES□ FENDER PILES
RECORDER: A. Patterson DIVERS/INSP'RS: M. Perry / N. Colson

COMMENTS

INSPECTION RECORD - STEEL PILES

PILE LOCATION
(&/or: ID NO.; STA)
BENT
NO.

LOCATION ON PILE DIMENSIONS UT (2)
RDG
(inch)
ELEC
POT'L
(3)

PILE CONDITION RATING OBSERVATION / DAMAGE
DATE: _9/20/22 & 9/21/22__ JOB NO: 221782 SHT NO.: __ X ABOVE WATER X UNDERWATER LOCATION: Point Arena TERMINAL / BERTH NO.: Fishing Pier

XSTANDARD PILES
Boarding Float
III -10 0.450 FH X Newer pile, minor surface corrosion
-5 0.4500 0.450
NE 84 X Corrosion, <25% section lossSE FH X Corrosion, <25% section loss NI
ND
MNMD
MJ
SV

BF WBFBF

1. Side 1 = Toward outboard face of pier. Side 2,3,4 = Clockwise from side 1 (square).

2. UT = Ultrasonic Thickness. Typically for u/w Level III or a/w corrosion profile.3. Electrical Potential measured with Bathycorrometer (u/w only), for corrosion profile.

CONDITION RATINGS:

Not inspected. Inaccessible or passed by. NOTE if inaccessible.No Deterioration/Damage. Protective coating intact. Light surface rustMinor Deterioration/Damage. (1) Less than 50% of perimeter or circumference affected by corrosion at any elevation or cross section. (2) Loss of thickness up to 15% of nominal at any location. Rate worse if: (a) Changes in straight line configuration or local buckling; (b) Corrosion loss > fabrication tolerances (any location) Moderate Deterioration/Damage. ANY OF: (1) >50%of surface at any elevation/cross-section affected by corrosion; (2)15%- 30% loss of nominal thickness at any location.Rate worse if: (a) Changes in straight line configuration or local buckling; (b) Section loss > 30% (any loc'n) Major Deterioration/Damage. ANY OF: (1) Partial loss of flange edges or visible reduction of pipe pile wall thickness; (2) 30%- 50% loss of nominal thickness, any location. Rate worse if : (a) Changes in straight line configuration or local buckling; (b) Perforations or section loss > 50% (any loc'n) Severe Deterioration/Damage. ANY OF: (1) Structural bends or buckling, breakage and displacement at supports, loose or lost connections; (2) 30%-50% loss of nominal thickness, any location.

ADDITIONAL COMMENTS &/OR FIELD USE ABBREVIATIONS / DEFINITIONS:
[See also "Typical Inspection Notes Abbreviations " document.] Deck Panel Bent 1/2 - Panel 1 X
Bent 1/2 - Panel 2 XBent 1/2 - Panel 3 XBent 1/2 - Panel 4 XBent 1/2 - Panel 5 XBent 2/3 - Panel 1 XBent 2/3 - Panel 2 XBent 2/3 - Panel 3 XBent 2/3 - Panel 4 XBent 2/3 - Panel 5 XBent 3/4 - Panel 1 XBent 3/4 - Panel 2 XBent 3/4 - Panel 3 XBent 3/4 - Panel 4 XBent 3/4 - Panel 5 XBent 4/5 - Panel 1 XBent 4/5 - Panel 2 XBent 4/5 - Panel 3 XBent 4/5 - Panel 4 XBent 4/5 - Panel 5 XBent 5/6 - Panel 1 X Deck PanelDeck PanelDeck PanelDeck Panel
Corrosion Spalling and Delamination, 75sf
Deck Panel Corrosion Spalling and Delamination, 75sf, exposed rebar Deck Panel Corrosion Spalling and Delamination, 5sf
Corrosion Spalling and Delamination, 75sf, exposed rebar Corrosion Spalling and Delamination, 25sfCorrosion Spalling and Delamination, 50sfCorrosion Spalling and Delamination, 80sfCorrosion Spalling and Delamination, 80sf Corrosion Spalling and Delamination, 5sfCorrosion Spalling and Delamination, 5sf Corrosion Spalling and Delamination, 90sf
Corrosion Spalling and Delamination, 75sf, exposed rebar Corrosion Spalling and Delamination, 5sf
DATE: _9/20/2022________ JOB NO: 221782 SHT NO.: _____
RECORDER: A. Patterson DIVERS/INSP'RS: N. Colson & M. Perry

COMMENTS
Corrosion Spalling and Delamination, 75sf, exposed rebar Corrosion Spalling and Delamination, 25sfCorrosion Spalling and Delamination, 10sf Corrosion Spalling and Delamination, 5sf
Corrosion Spalling and Delamination, 80sf
MJ
Corrosion Spalling and Delamination, 75sf
Deck Panel Corrosion Spalling and Delamination, 75sf, exposed rebarDeck PanelDeck PanelDeck PanelsDeck PanelDeck PanelDeck PanelDeck PanelDeck PanelDeck Panel

INSPECTION RECORD - STRUCTURAL COMPONENTS

CONDITION RATING

ND MN SV
Deck Panel
NI
Component ID LOCATION (&/or: ID NO.; STA)
Deck PanelDeck PanelDeck PanelDeck Panel
MD
LOCATION: Point ArenaLOCATION ID: Fishing Pier
Corrosion Spalling and Delamination, 50sf
DATE: _9/20/2022________ JOB NO: 221782 SHT NO.: _____
RECORDER: A. Patterson DIVERS/INSP'RS: N. Colson & M. Perry

COMMENTS
MJ

INSPECTION RECORD - STRUCTURAL COMPONENTS

CONDITION RATING

NI ND MN SV
Component ID LOCATION (&/or: ID NO.; STA) MD
LOCATION: Point ArenaLOCATION ID: Fishing Pier
Bent 5/6 - Panel 2 XBent 5/6 - Panel 3 XBent 5/6 - Panel 4 XBent 5/6 - Panel 5 XBent 5/6 - Panel 6 XBent 5/6 - Panel 7 XBent 5/6 - Panel 8 XBent 6/7 - Panel 1 XBent 6/7 - Panel 2 XBent 6/7 - Panel 3 XBent 6/7 - Panel 4 XBent 6/7 - Panel 5 XBent 6/7 - Panel 6 XBent 6/7 - Panel 7 XBent 7/8 - Panel 1 XBent 7/8 - Panel 2 XBent 7/8 - Panel 3 XBent 7/8 - Panel 4 XBent 8/9 - Panel 1 XBent 8/9 - Panel 2 XBent 8/9 - Panel 3 X Deck Panel Bent 8/9 - Panel 4 X Corrosion Spalling and Delamination, 25sf Corrosion Spalling and Delamination, 20sf
Deck Panel Corrosion Spalling and Delamination, 5sfDeck Panel Corrosion Spalling and Delamination, 5sfDeck Panel Corrosion Spalling and Delamination, 5sfDeck Panel Corrosion Spalling and Delamination, 5sfDeck Panel Corrosion Spalling and Delamination, 5sf Corrosion Spalling and Delamination, 5sf
Deck Panel Corrosion Spalling and Delamination, 5sfDeck Panel Corrosion Spalling and Delamination, 5sfDeck Panel Corrosion Spalling and Delamination, 5sfDeck Panel Corrosion Spalling and Delamination, 10sf Corrosion Spalling and Delamination, 5sf
Deck Panel Corrosion Spalling and Delamination, 5sfDeck Panel Corrosion Spalling and Delamination, 5sf Corrosion Spalling and Delamination, 30sf
Deck Panel Corrosion Spalling and Delamination, 10sfDeck Panel Corrosion Spalling and Delamination, 5sf Corrosion Spalling and Delamination, 5sf
Corrosion Spalling and Delamination, 30sf
Corrosion Spalling and Delamination, 5sfCorrosion Spalling and Delamination, 5sf Deck PanelDeck PanelDeck PanelDeck PanelDeck PanelDeck PanelDeck PanelDeck Panel DATE: _9/20/2022________ JOB NO: 221782 SHT NO.: _____
RECORDER: A. Patterson DIVERS/INSP'RS: N. Colson & M. Perry

COMMENTS
MJ

INSPECTION RECORD - STRUCTURAL COMPONENTS

CONDITION RATING

NI ND MN SV
Component ID LOCATION (&/or: ID NO.; STA) MD
LOCATION: Point ArenaLOCATION ID: Fishing Pier
Bent 9/10 - Panel 1 XBent 9/10 - Panel 2 XBent 9/10 - Panel 3 XBent 9/10 - Panel 4 XBent 10/11 - Panel 1 XBent 10/11 - Panel 2 XBent 10/11 - Panel 3 XBent 10/11 - Panel 4 XBent 11/12 - Panel 1 XBent 11/12 - Panel 2 XBent 11/12 - Panel 3 XBent 11/12 - Panel 4 XBent 12/13 - Panel 1 XBent 12/13 - Panel 2 XBent 12/13 - Panel 3 XBent 12/13 - Panel 4 XBent 12/13 - Panel 5 XBent 13/14 - Panel 1 XBent 13/14 - Panel 2 XBent 13/14 - Panel 3 XBent 13/14 - Panel 4 XBent 13/14 - Panel 5 X Corrosion Spalling and Delamination, 5sf
Deck PanelDeck PanelDeck PanelDeck PanelDeck PanelDeck PanelDeck Panel Corrosion Spalling and Delamination, 50sfDeck PanelDeck Panel Spall
Deck PanelDeck PanelDeck PanelDeck PanelDeck Panel Corrosion Spalling and Delamination, 25sf Corrosion Spalling and Delamination, 5sf
Deck Panel Corrosion Spalling and Delamination, 10sfDeck Panel Corrosion Spalling and Delamination, 10sfDeck Panel Corrosion Spalling and Delamination, 15sfDeck Panel Corrosion Crack at Utility Hanger, 7ft long Deck PanelDeck PanelDeck PanelDeck Panel
DATE: _9/20/2022________ JOB NO: 221782 SHT NO.: _____
RECORDER: A. Patterson DIVERS/INSP'RS: N. Colson & M. Perry

COMMENTS
MJ

INSPECTION RECORD - STRUCTURAL COMPONENTS

CONDITION RATING

NI ND MN SV
Component ID LOCATION (&/or: ID NO.; STA) MD
LOCATION: Point ArenaLOCATION ID: Fishing Pier
Bent 14/15 - Panel 1 XBent 14/15 - Panel 2 XBent 14/15 - Panel 3 XBent 14/15 - Panel 4 XBent 14/15 - Panel 5 XBent 15/16 - Panel 1 XBent 15/16 - Panel 2 XBent 15/16 - Panel 3 XBent 15/16 - Panel 4 XBent 15/16 - Panel 5 XBent 16/17 - Panel 1 XBent 16/17 - Panel 2 XBent 16/17 - Panel 3 XBent 16/17 - Panel 4 XBent 16/17 - Panel 5 X Deck PanelDeck PanelDeck PanelDeck PanelDeck PanelDeck PanelDeck PanelDeck PanelDeck PanelDeck Panel Corrosion Spalling and Delamination, 10sf Deck PanelDeck PanelDeck Panel Corrosion Spalling and Delamination, 10sfDeck PanelDeck Panel DATE: _9/20/2022________ JOB NO: 221782 SHT NO.: _____
RECORDER: A. Patterson DIVERS/INSP'RS: N. Colson & M. Perry

COMMENTS
MJ

INSPECTION RECORD - STRUCTURAL COMPONENTS

CONDITION RATING

NI ND MN SV
Component ID LOCATION (&/or: ID NO.; STA) MD
LOCATION: Point ArenaLOCATION ID: Fishing Pier
Bent 1 XBent 2 XBent 3 XBent 4 XBent 5 XBent 6 XBent 7 XBent 8 XBent 9 XBent 10 XBent 11 XBent 12 XBent 13 XBent 14 XBent 15 XBent 16 XBent 17 X Corrosion cracks and spalling, lower corners and soffitt, 10LF west face, 5sf on soffitt Pile Cap
Corrosion cracks and spalling, lower corners, 20LF east face, 25LF west face Pile Cap
Corrosion cracks and spalling, lower corners and soffitt, 25LF east face, corner spall NW corner 18x4x2 exposed bar Pile Cap
Corrosion cracks on soffit, 10LF, corrosion cracks on west face 25ft Pile Cap
Corrosion cracks and spalling, lower corners and soffitt, 15LF west face, 5LF on soffitt Pile Cap
Corrosion cracks and spalling, lower corners, 5LF east face, 20LF west face Pile Cap
Corrosion cracks and spalling, lower corners and soffitt, 5LF east face, 20LF west face
Pile CapsPile CapPile CapPile CapPile CapPile Cap
Corrosion cracks and spalling, lower corners, 25LF west faceSpalling on south face, 8" x 1" deepCorrosion cracking, 15 LF total Corrosion cracks and spalling, lower corners, 5LF west face and east face5LF Corrosion cracking on soffitt midspan Pile CapPile CapPile CapPile CapPile CapPile Cap
DATE: _9/20/2022________ JOB NO: 221782 SHT NO.: _____
RECORDER: A. Patterson DIVERS/INSP'RS: N. Colson & M. Perry

COMMENTS
MJ

INSPECTION RECORD - STRUCTURAL COMPONENTS

CONDITION RATING

NI ND MN SV
Component ID LOCATION (&/or: ID NO.; STA) MD
LOCATION: Point ArenaLOCATION ID: Fishing Pier
Bent 15:South XBent 12.3:South XTypical XBent 8.5: South XBent 15:South XBent 17:West XBent 14.2:A XBent 14.9: A XBent 12.9:A XBent 13.5:A XTypical XTypical XTypical XTypicalTypical X Corrosion, broken u-bolt
Boarding Float and GangwayDeckingGangway
Holes in float decking, up to 2-inch diameter
Fender Pile Restraint BracketFender Pile Restraint Bracket CorrosionCorrosion
UtilitiesConduitLight PoleUtility HangersConduitLight Pole Corroded Hangers Throughout
Conduit Separated at Fitting
Missing, Broken Bracket
ConduitFender Pile Restraint BracketCleatsCleat Anchor BoltsLongitudinal BeamsFender Pile Restraint BracketFender Pile Restraint Bracket Corrosion
Missing, Broken Pole
Corrosion
Broken Anchor Bolt
Conduit Separated at Fitting
Broken Conduit
Corrosion, holes through web at cleat anchor bolt locations holes and impact damage along deck surface
X
DATE: _9/20/2022________ JOB NO: 221782 SHT NO.: _____
RECORDER: A. Patterson DIVERS/INSP'RS: N. Colson & M. Perry

COMMENTS
MJ

INSPECTION RECORD - STRUCTURAL COMPONENTS

CONDITION RATING

NI ND MN SV
Component ID LOCATION (&/or: ID NO.; STA) MD
LOCATION: Point ArenaLOCATION ID: Fishing Pier
Bent 7:South XBent 11: South XBent 13: South XBent 15:South XBent 13:North XTypical XBent 17 XTypical XTypical XBent 17 XBent 16.5:South XBent 9.5:South XBent 1:South - Bent 6:South XBent 1:North - Bent 5:North XBent 7:North - Bent 9.5:North XBent 17 XBent 6:South XBent 7:North to Bent 9:North XBent 4 X PostsLadderLadderLadderLadderGuardrailing
Corrosion, Broken at lower bracket, missing below +6ft
LaddersConnection HardwareLadder
Corrosion, Broken at lower bracket
Corrosion from +5ft and below
Broken at +10ft
Loose connections
Rail Boards 11-inch gap between rail segments, both sidesRail Boards Corrosion from +3ft to +7ft
Posts
Split, Weathered, and loose
Split, 20 total posts
Posts Split, 16 total postsRail Boards Loose connectionsPosts Split, 9 total postsRail BoardsPost Brackets Severe corrosion and section loss, 8 total brackets Split, 6 total posts
Rail Boards Loose connectionsPosts Split, 50% section loss, 3 total posts Loose hardware, corroded
Split ends
Posts Split, 8 total postsPosts
DATE: _9/20/2022________ JOB NO: 221782 SHT NO.: _____
RECORDER: A. Patterson DIVERS/INSP'RS: N. Colson & M. Perry

COMMENTS
MJ

INSPECTION RECORD - STRUCTURAL COMPONENTS

CONDITION RATING

NI ND MN SV
Component ID LOCATION (&/or: ID NO.; STA) MD
LOCATION: Point ArenaLOCATION ID: Fishing Pier
Typical XBent 13.5:South XBent 12:North X16.5:North X7.5:South XTypical X Corrosion PavementCleatAsphalt Surfacing Gouges, and pitting up to 1-inch deep Asphalt Surfacing Pavement removed. Allows infiltration of water through deckMooring HardwareCleat CorrosionCleat CorrosionAsphalt Surfacing Hole in pavement through deck. Previous drain location

INSPECTION RECORD - TIMBER FENDER PILES
PILE NO. GAGE DEPTH ELEV (MLLW) SIDE(1) HGT WIDTH PENETR NI ND MN MD MJ SV FP X MissingFP X MissingFP X MissingFP X MissingFP X MissingFP X MissingFP X Abrasion and weatheringFP X X Abrasion and weatheringFP X X MissingFP X X Creosote Treated, Abrasion and weathering
FP X X ACZA TreatedFP X X
Creosote Treated, Abrasion and weathering
FP X X ACZA TreatedFP X X X New - Treated and WrappedFP X X ACZA Treated

12.3:B FP X X ACZA Treated12.5:B FP X X
Creosote Treated, Abrasion and weathering

12.8:B FP X X ACZA Treated13.3:A FP X X X New - Treated and Wrapped13.5:A FP X X X New - Treated and Wrapped13.8:A FP X X X New - Treated and Wrapped14.3:A FP X X X New - Treated and Wrapped14.5:A FP X New - Untreated14.8:A FP X X X New - Treated and Wrapped12.3:A12.5:A12.8:A10.5:A10.8:A11.3:A11.5:A11.8:A6.8:A7.3:A7.5:A7.8:A10.3:A RECORDER: A. Patterson DIVERS/INSP'RS: N. Colson & M. Perry

PILE LOCATION
(ID NO.)
BENT
NO.

6.5:A
BATTER?
WRAPPED? COMMENTS INSPN LEVEL: I (u.o.n.); II (T/M/B); III TIME & / OR TIDE (MLLW) OBSERVATION / DAMAGE

X FENDER PILES

LOCATION ON PILE DIMENSIONS

6.3:A
□ OTHER __________________________
BORERS PILE CONDITION RATING SECT LOSS (%)

X ABOVE WATERX UNDERWATER
□ STANDARD PILES DATE: 9/20/2022 JOB NO: 221782
LOCATION: Point Arena TERMINAL / BERTH NO.: Fishing Pier TREATED?

INSPECTION RECORD - TIMBER FENDER PILES
PILE NO. GAGE DEPTH ELEV (MLLW) SIDE(1) HGT WIDTH PENETR NI ND MN MD MJ SV RECORDER: A. Patterson DIVERS/INSP'RS: N. Colson & M. Perry

PILE LOCATION
(ID NO.)
BENT
NO.

BATTER?
WRAPPED? COMMENTS INSPN LEVEL: I (u.o.n.); II (T/M/B); III TIME & / OR TIDE (MLLW) OBSERVATION / DAMAGE

X FENDER PILES

LOCATION ON PILE DIMENSIONS
□ OTHER __________________________
BORERS PILE CONDITION RATING SECT LOSS (%)

X ABOVE WATERX UNDERWATER
□ STANDARD PILES DATE: 9/20/2022 JOB NO: 221782
LOCATION: Point Arena TERMINAL / BERTH NO.: Fishing Pier TREATED?

15.3:A FP X X X New - Treated and Wrapped15.5:A FP +5 S 60 X Abrasion15.8:A FP X X X New - Treated and Wrapped13.3:B FP X Creosote Treated, Abrasion and weathering

13.5:B FP X
Creosote Treated, Abrasion and weathering

13.8:B FP +3 N X 25 X Marine Borer Cavity14.3:B FP X X ACZA Treated14.5:B FP X X ACZA Treated14.8:B FP X X ACZA Treated15.3:B FP X X Creosote Treated15.5:B FP X X Creosote Treated15.8:B FP X Missing16.3:B FP X Missing16.5:B FP X Missing16.8:B FP X NI
ND
MNMD
MJ
SV Severe Deterioration/Damage. ANY OF: (1) Diameter loss >30%; (2) Cross-section area loss >50%; (3) Loss of connections &/or fully non-bearing condition; (4) Partial or complete breakage.

Minor Deterioration/Damage. Checks, splits, and gouges < 0.5 inch wide.

Rate worse if: (a) X-sect'n loss; (b) Marine borer infestation; (c) Displacem't, loss of bearing or conxns.

No Deterioration/Damage. Sound material surface.Not inspected. Inaccessible or passed by. NOTE if inaccessible.Moderate Deterioration/Damage. ANY OF: (1) Checks and splits >0.5 inch wide; (2) Diameter loss up to 15%; (3) Cross-section area loss up to 25%. Corroded hardware; (4) Marine borer infestation.

Rate worse if: Displacement, loss of bearing or connections.

Major Deterioration/Damage. ANY OF: (1) Checks and splits through full depth of cross-section; (2) Diameter loss 15-30%; (3) Cross-section loss 25-50%. Heavily corroded hardware; (4) Displacement, misalignments at connections.Rate worse if: Partial or complete breakage.

CONDITION RATINGS:

Point Arena Fishing Pier Condition Assessment Report | City of Point Arena B-1
Appendix B

PILE DEFECT PLAN
17 16 15 14 13 12 11 10 9 8 7 ML = -12ft MLLW ML = -11ft MLLW ML = -12ft MLLW ML = -6ft MLLW LADDER, TYP FENDER PILE, TYP GANGWAY BOARDING FLOAT ML = -10ft MLLW ML = -6ft MLLW ML = -7ft MLLW ML = -8ft MLLW PILE BENT NUMBERING, TYP BA PILE ROW DESIGNATION, TYP PILE BF:NE PILE BF:SE PILE BF:W 7 6 5 4 3 2 1 ML = -3ft MLLW ML = -2ft MLLW ML = +1ft MLLW ML = +1ft MLLW PILE BENT NUMBERING, TYP BA PILE ROW DESIGNATION, TYP C POINT ARENA FISHING PIER 8' 0 8' 16' SCALE: 1/16" = 1'-0" ARENA COVE 2022 FACILITY CONDITION ASSESSMENT
FIGURE 1 FLOOD EBB 1- PILE DEFECT PLAN SCALE: 1/16" = 1'-0"

MATCHLINE - SEE BELOW
MATCHLINE - SEE ABOVE PILE RATING LEGEND: NO DAMAGE MINOR MODERATE MAJOR SEVERE 1- PILE DEFECT PLAN SCALE: 1/16" = 1'-0" 17 16 15 14 13 12 11 10 9 8 7 1234 12345 LADDER, TYP GANGWAY BOARDING FLOAT DECK PANEL NUMBERING, TYP PILE BENT NUMBERING, TYP BA PILE ROW DESIGNATION, TYP 7 6 5 4 3 2 1 1345 12345678 DECK PANEL NUMBERING, TYP PILE BENT NUMBERING, TYP BA PILE ROW DESIGNATION, TYP C BENT 4 PILE CAP MAJOR CORROSION CRACKS, SPALLS, AND EXPOSED REBAR 2 DECK PANEL WITH MAJOR CORROSION CRACKS, SPALLS, AND EXPOSED REBAR , TYP POINT ARENA FISHING PIER 8' 0 8' 16' SCALE: 1/16" = 1'-0" ARENA COVE 2022 FACILITY CONDITION ASSESSMENT
FIGURE 2 - DECK PANELS FLOOD EBB 1- UNDERDECK DEFECT PLAN SCALE: 1/16" = 1'-0"

MATCHLINE - SEE BELOW
MATCHLINE - SEE ABOVE 1- UNDERDECK DEFECT PLAN SCALE: 1/16" = 1'-0" NOTES: 1. MINOR AND MODERATE DEFECTS OBSERVED DURING THE INSPECTION ARE NOT SHOWN. DEFECTS SHOWN REPRESENT OBSERVED MAJOR TO SEVERE DEFECTS ONLY. REFER TO APPENDIX A FOR ADDITIONAL DEFECTS NOT SHOWN HERE.