Item VIII A will be continued to
and be heard at the June 25
2024 City Council meeting
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
OWNERS/APPLICANTS: 610 LLC/ Jeffrey Hansen
PO Box 669
Point Arena, CA 95468
REQUEST: The applicant requests a Lot Line Adjustment to transfer 0.145 acres (6,316.2 SF) from Parcel B (APN 027-122-21) to Parcel A (027-122-20), and a Coastal Development Permit and Use Permit to: 1) reestablish a residential use, reuse a building for a restaurant, and construct a 280-SF trellis on Parcel A; 2) reestablish and rehabilitate lodging, restaurant, and residential use on Parcel B; 3) demolish existing 3,880-SF structure on Parcel B; 4) construct five detached lodging units of 160 SF each on Parcel B; and 5) other associated site work as demonstrated on the project plans.
LOCATION: In the Coastal Zone, in the City of Point Arena, Mendocino County at 135 and 165 Main Street, Point Arena, CA. Project is located on the east side of Main Street, at its intersection with Mill Street (027- 122-20 and -21).
APPEALABLE AREA: Yes
PERMIT TYPE: Coastal Development Permit, Use Permit, and Lot Line Adjustment TOTAL ACREAGE: 1.09 acres
GENERAL PLAN: Highway Commercial
ZONING: Highway Commercial
EXISTING USES: Vacant commercial and hotel
ADJACENT LAND USES: Surrounding properties are zoned a mix of (AE) Agriculture Exclusive, (C) Commercial Core, (HWC) Highway Commercial and (UR) Urban Residential.
North: Commercial and Residential
South: Residential and Creek
East: Residential
West: Commercial
ENVIRONMENTAL DETERMINATION: A Mitigated Negative Declaration has been prepared for this project and was circulated for public and agency comment from April 23 through May 28th.
OTHER RELATED APPLICATIONS: None
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
PROJECT DESCRIPTION
The proposed project requires the approval of a Coastal Development Permit, Boundary Line Adjustment, and Use Permit, and includes the following components:
Boundary Line Adjustment
Boundary Line Adjustment to reconfigure boundary lines between two adjacent lots in Point Arena. Parcel A (APN 027-122-20) would increase from 5,393± SF to 10,759± SF, and Parcel B (APN 027-122-21) would decrease from 42,267± SF to 40,685± SF.
Development on Proposed Parcel A (APN 027-122-20)
• Reestablish restaurant use in existing structure
Interior and exteriorremodel of existing 461±SF structure (historically used as restaurant and retail space) to 826 SF restaurant/market space.
Construction of a 280± SF trellis and courtyard in front of the existing structure for outdoor restaurant seating.
• Reestablish residential use in existing structure
Interior and exterior remodel of existing 1,224± SF structure (historically a residence) to a duplex with one unit on the first floor and one unit on the second floor. • Site Improvements
Additional site improvements on proposed Parcel A include:
New landscaping to the east and west of the residential structure, between the two buildings, and between the proposed parking lot and the restaurant.
A new short retaining wall is proposed between the buildings and between the restaurant and the parking lot.
New site parking lot with 14 spaces and shared drive isle with Parcel B. New paved walkways from parking areas to the existing buildings.
Both existing structures are served by existing water, sewer and electrical connections.
Access is provided by existing encroachments on Main Street (Hwy 1) and Mill Street, and requires access easements over proposed Parcel B.
Development on Proposed Parcel B (APN 027-122-21)
• Reestablish lodging use and establish restaurant and residential use in existing structure Interior and exterior remodel of existing 4,160± SF structure (historically used for lodging) for a 20-unit lodging use, two residential units, and 1,880± SF restaurant space.
Construct 28 off-street parking spaces for the uses in this structure (24 standard and four ADA spaces). • Demolish existing structure (work completed without permits) Demolish 3,880± SF structure (historically used for lodging).
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
• Construct five (5) detached lodging units
In a previously vacant area of proposed Parcel B, construct five (5) detached 160± SF lodging units. Five (5) off-street parking spaces provided on-site (four (4) required). • Site Improvements. Additional improvements on proposed Parcel B include:
• Landscaped areas around the proposed lodging units and restaurant. • A 140± foot-long retaining wall is proposed along the east side of development to separate the project from natural resources along Arena Creek.
• A 40,000-gallon subterranean water tank for fire suppression is proposed with a 32-foot-tall gazebo placed on top.
• A 40-foot-tall windmill is proposed adjacent to the five new lodging units, • A 27-foot-tall, elevated water tank is proposed adjacent to Main Street. • A trash collection area is proposed between the lodging uses. • A total of 19 parking spaces are proposed on this parcel to serve the proposed uses with an additional 9 parking spaces located on parcel A, which also serve these uses, and which will require access and maintenance easements. Areas proposed for parking were either previously paved for parking or were within the footprint of the demolished building. • The existing structure on proposed Parcel B is served by existing water, sewer and electrical service. The proposed five new lodging units will connect to water and sewer service from Main Street and use existing electrical service on site.
• Access is provided by existing encroachments on Main Street (Hwy 1) and Mill Street, and requires access easements over proposed Parcel A.
CDP & USE PERMIT ANALYSIS
CONSISTENCY WITH THE GENERAL PLAN
The Project is consistent with the following relevant goals and programs set forth in the General Plan:
Coastal Act Priority Uses (page 2)
The Coastal Act also establishes a framework for resolving conflicts among competing uses for limited coastal lands. Following is a list of land use priorities from highest to lowest, as established by the Coastal Act [Sections 30213, 30220-23, 30234, 30241-43, 30250, 30253 and 30255]:
(A) Development Priorities
1. Preservation and protection of natural resources, including environmentally sensitive habitats, and prime agricultural and timber lands.
2. Coastal dependent industry and commerce (in non-environmentally sensitive habitat areas) and commercial fishing.
3. Coastal or water dependent public recreation.
4. Non-coastal or non-water dependent public recreation.
5. Visitor serving commercial recreational, lower cost.
6. Visitor serving commercial recreational, higher cost.
7. Private residential, general industrial or commercial development.
Visitor-serving commercial uses (hotels) and a Coastal Act priority use, as such, receive preference over residential or general commercial development. The project is consistent with this policy.
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
Opportunities (page 8)
6. Allowing a greater proportion of residential units connected with commercial Downtown growth...in order to foster mixed uses, Downtown revitalization, a built-in demand for Downtown goods and services, and affordable housing (on now undeveloped and underdeveloped lots).
The proposed project is a mixed-use project which includes four residential units within the downtown core and so it complies with this policy.
Coastal Element (page 17)
5. Existing, lower cost visitor-serving and recreation facilities, including overnight accommodations, shall be protected to the maximum feasible extent. Removal or conversion of existing lower cost opportunities shall be prohibited unless the use will be replaced with another offering comparable visitor-serving or recreational opportunities.
6. Priority shall be given to the development of visitor-serving and commercial recreational facilities designed to enhance public opportunities for coastal recreation. On land designated for visitor-serving commercial and/or recreational facilities, priority shall be given to such use over private residential or general commercial development. New visitor serving uses shall not displace existing low-cost visitor-serving uses unless an equivalent replacement is provided.
The proposed project includes removal of a 3,880 SF former inn structure, which has already occurred, so this is an after the fact CDP to remove that structure. It is unclear if the prior units were low-cost and visitor-serving as the project had been vacant for over 20 years, and in disrepair for at least as long. The rehabilitated inn will provide 25 hotel rooms, including five new hotel units of 160 SF each. Arguably, the new hotel will not displace existing low-cost, visitor-serving units because the units have not been operational for more than 20 years. The City Council can find that the project is consistent with these policies.
CONSISTENCY WITH LAND USE
The project site is designated Highway Commercial in both the General Plan and Zoning Map. The zoning ordinance allows all of the proposed uses in the Highway Commercial zone as follows:
Principally Permitted Uses
• General retail goods and services including cafes and restaurants, delis, food stores, convenience sales, markets, bakeries, and pharmacies. • Visitor-serving facilities such as hotel, motel, inns, and hostels. • Existing dwellings and living quarters.
Conditionally Permitted Residential Uses
• Multi-family dwellings of any type or mixture.
The four units of multi-family housing require approval of a conditional use permit, while the remainder of the project is permitted by right.
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
CONSISTENCY WITH DEVELOPMENT STANDARDS
Development Standards. The project is consistent with the various applicable development standards of the HWC zoning district, as follows:
Development Standards
Requirement Project Conformance
Setbacks: front 20
feet; rear 15 feet;
side 10 feet.
Front for new Construction: front 20
feet; rear 50+ feet; side 10 feet.
Setbacks for Existing Structures:
front 5 feet; rear 5 feet; side 5 feet.
Yes, for all new structures. All
existing structures are legal
non-conforming structures and
compliance with setback
requirements is not required.
Height: 45 feet New Construction: Fire storage
tank 32 feet; Water Tower 27 feet;
WE-5 13.9 feet; Windmill 40 feet.
Existing Buildings: WE-1, WE-2,
WE-3, WE-4 and WE-6 are existing
conforming.
Yes, for all new Structures.
(However, the windmill is not
permitted per a mitigation
measure in the MND.)
Yes, for all existing structures.
Minimum lot area:
10,000 SF
Lot size is 51,444 SF. Yes
Minimum lot width:
100 feet.
Lot A is 102 feet by 105 feet.
Lot B is 217 feet by 242 feet.
Yes
Yes
Parking Standards. The project is consistent with parking requirements as described below. Sec. 5.28.
B defines parking space requirements by proposed use. The table below includes all relevant off-street parking space requirements and provided spaces for each proposed use. As noted in the table, the project provides more parking than is required by the zoning code for every use. The City of Point Arena zoning code does not limit the amount of allowable parking, therefore the project complies with the zoning ordinance with regard to the provision of parking spaces.
Parking Requirement Required Provided Conforms
Single- or multi-family
dwellings as a secondary use
dwelling unit located in a
commercial district.
One space per unit. 4 units = 4
spaces.
4 spaces Yes
Commercial and Public/Quasipublic Uses. Small establishments in existing and new buildings.
No spaces required for
any use with a floor area
less than 600 SF and
located in a building with
not more than one other
use of less than 600 SF.
Building W/E
6 is an
existing
building of
less than
600 SF = no
spaces.
No Parking Yes
Hotels, motels, inns, rooming One space per 1 1/2
sleeping units.
29 beds/1.5
= 20 parking
spaces.
24 Provided Yes
Restaurants, bars, retail sales,
personal services, and all other
commercial, public, and quasipublic uses not listed
One space per 400 SF
floor area.
2,706
SF/400= 7
spaces.
7 Provided Yes
Total Spaces 31 spaces 35spaces Yes
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
Figure 1: Site Plan illustrating Parking Lot.
The Project site does not currently include Bicycle Parking and Sec. 5.28.9 requires bicycle parking.
5.28.9 Sufficient bicycle storage space, as determined by the Planning Commission, shall be provided in all parking areas of ten (10) or more spaces.
Therefore, Mitigation Measure LU -1 was required by the MND, and Staff recommends Special Condition 1, which will also incorporate all mitigation measures mentioned in the report into the special conditions for the project.
Special Condition 1: The applicant shall implement all mitigation measures required in the MND.
Landscaping and Screening (Section 5.14). The Project complies with the landscaping and screening requirements except for the following requirements from the ordinance:
Requirement Mitigation Measure
5.14.C - Dense landscaping or a solid wall or fence of
a minimum height of 6 feet shall be provided along
the rear and side property lines of any non-residential use which abuts on a residential use; to screen any
open area used for the storage of goods, materials, or
waste from view from abutting properties and from
public right-of-way...
The MND requires Mitigation Measure LU -2
Wood Fence, which requires the applicant to
install a solid wood fence of 6 feet in height
along the east property line and around the
refuse container.
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
5.14.E Perimeter landscaping shall be provided
between parking spaces and adjacent street right-ofway whenever five or more parking spaces are required. Such landscaping area shall be at least 4
feet wide and protected from damage by a curb or
header adjacent to the parking area. In addition,
whenever five or more parking spaces are required,
one tree shall be provided, with an additional tree
required for every 10 additional required parking
spaces. Such trees shall be planted in tree wells at
least 4 feet by 4 feet, protected by a curb or header.
Whenever five or more parking spaces are required,
at least 4 percent of the parking area, including the
above required landscaping, shall be landscaped.
The requirements of the code have been
addressed in the landscaping plan with the
exception of trees. For example, perimeter
landscaping is provided between parking
spaces and adjoining public sidewalks, as the
code requires.
The MND requires Mitigation Measure BIO6c which requires a new landscaping plan with at least 14 trees which exceeds this tree
requirement for parking (three trees).
Site Development & Architectural Review Sec 5.15
The proposed Project will comply with the requirements of Site Development and Architectural Review as follows:
Relevant Requirements Compliance & Mitigation
C1. New development shall be sited and designed to
minimize adverse impacts on scenic areas from
scenic roads or public viewing areas to the maximum
feasible extent. If there is no feasible building site
location on the proposed project site where
development would not be visible, then the
development shall be sited and designed to minimize
impacts on scenic areas from scenic highways or
public viewing areas, through measures including,
but not limited to, siting development in the least
visible portion of the site, breaking up the mass of
new structures, designing structures to blend into the
natural hillside setting, restricting the building
maximum size, reducing maximum height standards,
clustering development, minimizing grading,
incorporating landscape elements, and where
appropriate, berming.
The Project includes removal of an “existing
structure” (already removed without benefit of a
CDP) that was one solid building and replacing
it with five smaller buildings that are dispersed
and located further from Highway 1. The
remainder of the project consists of pre-existing
structures which will be remodeled and
landscaped in a manner which will eliminate the
existing visual impacts from the jumbled and
abandoned buildings.
D3. Materials and colors used in construction shall
be selected for compatibility both with the structural
system of the building and with the appearance of
the building's natural and man-made surroundings.
Preset architectural styles (e.g., standard fast food
restaurant designs) shall be avoided.
The Applicant proposes to use the same white
and beige paint colors of the Wildflower West
project on the Wildflower East project. These
colors are compatible with the community.
D4. Plant materials should be used to integrate the
man-made and natural environments, to screen or
The applicant’s landscaping plan does not
include a plant list and so the MND includes
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
soften the visual impact of new development, and to
provide diversity in developed areas. Attractive
vegetation common to the area shall be used, and
native vegetation shall be used to the maximum
extent practicable. Invasive plant species that tend to supplant native species and natural habitats shall be
prohibited. Landscaping for MR, C, HW, and I zones
shall conform with the provisions of Section 5.14.
Mitigation Measure LU-3 to ensure
conformance with this section of the code.
MM LU-3: Landscaping Plan. The applicant
shall submit a Landscaping Plan for approval
by the City Planner, prior to approval of the
Building Permit which includes: 14 trees, at
least 50 percent native plant cover and no
potentially invasive species. The landscaping
shall provide 90 percent coverage within five
years.
D5. On-premises signs should be designed as an
integral part of the structure and should complement
or enhance the appearance of the surrounding area.
The applicant has not submitted a signage plan
for the project. The applicant will have to submit
a sign permit application for approval of the
sign permit at a later date.
D8. When reviewing the design of commercial or
residential buildings, the Planning Commission shall
ensure that the scale, bulk, orientation, architectural character of the structure and related improvements
are compatible with the rural, uncrowded, rustic,
unsophisticated, small, casual, open character of the
community. In particular, residences of more than
2,000 square feet in floor area and multiple-family
dwellings or commercial buildings of more than
4,000 square feet in floor area shall be considered
out of scale with the community unless they are
designed and situated in such a way that their bulk is
not obtrusive. Residential and commercial
developments involving multiple dwelling or business
units should utilize clusters of smaller structures with sufficient open space between them instead of a
consolidated structure.
The project complies with this requirement as
no single building is greater than 4,000 SF.
Additionally, the project includes small clusters
of buildings with landscaped areas and parking
located between the buildings as required.
D11. Developments shall be planned to avoid
removing trees, if feasible. At least two trees shall be planted for every one removed to accommodate
development facilitated by the General Plan. Visually
attractive native trees species, such as bishop pine
and sargent cypress, shall be the preferred species
used, as they require less water, herbicides,
pesticides, and are valuable to wildlife resources.
As noted in the MND, the project includes
removal of an existing tree. Mitigation Measure
LU-3 will result in compliance with this
regulation.
D17. Where feasible, long continuous retaining walls
shall be broken into sections or shall include
undulations to provide visual relief. Where feasible,
retaining walls supporting a structure should be
incorporated into the foundation system in a stepped
or split-level design. Retaining walls visible from
scenic highways, trails, parks and beaches should
incorporate veneers, texturing and/or colors that
blend with the surrounding earth materials or
landscape.
Two concrete retaining walls are proposed for
Parcel A which would be visible from the public
right of way. The MND includes Mitigation
Measure LU-4 which would result in
compliance with this regulation.
MM LU-4: The Building Permit application shall
illustrate veneers, texturing and/or colors for the
retaining walls that blend with the surrounding
earth materials or landscape, as directed by the
City Council.
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
D20. Land divisions, including lot line adjustments,
adjustments, shall be designed to minimize impacts
to visual resources by:
a. Clustering the building sites to minimize site
disturbance and maximize open space.
b. Prohibiting building sites on ridgelines.
c. Minimizing the length of access roads and
driveways.
d. Using shared driveways to access
development on adjacent lots, where feasible.
e. Reducing the maximum allowable density in
steeply sloping and visually sensitive areas.
f. Minimizing grading and alteration of natural
landforms
g. Landscaping or revegetating all cut and fill
slopes, and other disturbed areas at the
completion of grading
h. Incorporating interim seeding of graded
building pad areas, if any, with native plants
unless construction of approved structures
commences within 30 days of the completion
of grading.
The proposed project complies with the
following requirements: a, c, d, f, g.
The following requirements are not relevant to
the project: b, e, h.
The proposed Lot Line Adjustment complies
with this policy.
PUBLIC ACCESS
The project site is located east of Highway 1. There are no existing or mapped potential access routes along the project site. The project will not impact public access.
HAZARDS
The property is not located within a mapped Natural Hazard area. However, during the circulation of the Mitigated Negative Declaration to resource agencies, the City received a comment from the Water Board.
The parcel with the former gas station located on it had an underground storage tank which leaked petroleum onto both parcels. The Applicant removed those underground storage tanks and cleaned and capped a well on site and received a no-further-action letter from the Water Board for the removal of the underground storage tank and the capping of the well. In subsequent conversations with the Water Board they expressed concern that the project parcel was remediated to a commercial clean-up level, which complicates residential development on the property. Water Board staff reviewed the project plans and requested additional special conditions, to ensure that contaminated soils are capped with a concrete or asphalt cap. Staff worked with the Water Board to develop additional Mitigation Measures for the MND as follows:
HAZ-01: The Applicant shall cap the proposed landscaped located between the residential structure on Parcel A and the parking lot to the south as illustrated in the site plan below. The cap shall be of non-permeable pavement such as a concrete patio.
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
HAZ-02: The Applicant shall submit a Soil Management Plan (SMP) approved by the Regional Water Board, prior to the start of earth moving activities, which details required precautions when doing any earthwork at this site.
HAZ-03. The Applicant shall record a Land Use Covenant (LUC) which states that the capped area, outlined below in red must be maintained as a capped area and cannot be turned into bare ground or landscaped or play areas in the future.
The property is served by the Redwood Coast Fire Protection District (RCFPD). RCFPD maintains a fivebay fire station in Point Arena. The project was referred to the RCFPD. No comments were received from the Fire District.
The existing and proposed development is located in a relatively flat area and does not present hazard issues relative to slope failure. There are no known faults, landslides or other geologic hazards in close proximity to the proposed development.
VISUAL RESOURCES
The project is located within a relatively dense urban environment, on an already developed parcel. The proposed new development will not be located east of Highway 1 and will not block public views to or along the ocean. Additionally, new development will be located behind already existing development on the site.
There are no views to or along the ocean visible from Main Street through this parcel. The parcel is not located in a designated View Shed or Scenic Corridor as shown on the Scenic Corridors map.
Patio
Cap
Parking Lot Cap
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
Goal IV-4.14 of the General Plan’s Open Space and Conservation Element is “To preserve the existing qualities associated with a low level of artificial lighting on public and private properties.” The MND addresses this issue with Mitigation Measure AES-1.
NATURAL RESOURCES
Site Trees. The project site includes five to seven small trees on the northeast side of Parcel B. See image below.
Section 5.15.D 11. Includes Design Review criteria that are relevant to the protection and replacement of native trees.
Developments shall be planned to avoid removing trees, if feasible. At least two trees shall be planted for every one removed to accommodate development facilitated by the General Plan. Visually attractive native trees species, such as bishop pine and sargent cypress, shall be the preferred species used, as they require less water, herbicides, pesticides, and are valuable to wildlife resources.
This issue has been addressed in the MND through a required Mitigation Measure BIO-6c, which requires replacement of removed trees with native trees at a ratio of 2 to 1.
ESHA ANALYSIS
The City’s General Plan includes policies within the Open Space and Conservation Element aimed at protecting natural resources. These policies require the protection of environmentally sensitive habitat areas (ESHAs) and aim to enhance wildlife habitats. Open Space and Conservation Element Policy 14 establishes a 500-foot riparian setback area from the centerline of Arena Creek for the protection of Point Arena Mountain Beaver (PAMB). Within this setback area, the Zoning Ordinance requires surveys by a qualified biologist for signs of PAMB, and mitigation measures to be implemented limiting development activities and noise-generating construction activities proximate to identified habitat during the December 15 through June 15 breeding season.
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
In addition to PAMB, ESHAs are protected in the California Coastal Zone by implementation of City Zoning Code Section 18.25.220. Development in or adjacent to ESHA are required to meet the standards outlined in that section, notably a requirement that most development be prohibited within 100 feet of ESHA. ESHA buffers may be reduced to 50 feet after consultation with the California Department of Fish and Wildlife (CDFW) and concurrence that 100 feet is not necessary to protect the resource or habitat.
Rhiannon Korhummel, Senior Plant Biologist with WRA, surveyed the Project site on April 23, 2022 and on June 5, 2022 to evaluate the potential presence of special-status botanical and biological species, to assess the presence of suitable habitat for special-status species, and to determine and map the presence of critical habitat, essential fish habitat, and wildlife corridors (Environmentally Sensitive Habitat Area Survey, November 2022). Per the report, most of the Project site is either classified as developed lands or non-native annual grassland, characterized by Sweet Vernal Grass Meadow Semi-Natural Alliance. The areas identified as non-native grassland consists of less than 10 percent relative cover of natural species.
While no individual special-status wildlife or plant species were observed during any site visit, the survey and a subsequent memo which addresses fish habitat conclude that the following special-status resources and/or their habitats as either present at the Project site, likely to be present, or assumed to be present:
Resource Resource Type Status/Designation Survey Notes
Red Alder Forest Sensitive Natural
Community
(Riparian), ESHA
CDFW G5:S4 Observed on site,
mapped in ESHA
report.
Arena Creek Perennial Stream,
ESHA
Jurisdictional under
Clean Water Act.
NMFS Essential Fish
Habitat
Observed on site,
mapped in ESHA
report.
Point Arena
Mountain Beaver
Special-Status
Species
Federal Endangered,
CDFW Species of
Special Concern
Not observed on site,
high potential of
occurrence.
Consultation with
CDFW regarding the
project determined
that PAMB is not
located onsite.
Western pond
turtle
Special-Status
Species
CDFW Species of
Special Concern
Not observed on site,
presence is
presumed.
California redlegged frogSpecial-Status
Species
Federal Threatened,
CDFW Species of
Special Concern
Not observed on site,
presence is
presumed.
Steelhead Special Status
Species
Federal Threatened,
CDFW Species of
Special Concern.
Not observed on site,
presence is
presumed.
Coho Salmon Special Status
Species
Federal Endangered,
State Endangered.
Not observed on site,
presence is
presumed.
Riparian vegetation is present along the banks of Arena Creek. The canopy is intermittent and dominated by red alder with Sika willow and Pacific willow. The English ivy and Himalayan blackberry are invading the riparian vegetation. To prevent degradation to the existing structures, portions of riparian vegetation adjacent to structures are regularly maintained through weed-eating and tree pruning.
Potential project impacts:
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
• Five new, very small lodging units are proposed between the 50-foot and 100-foot buffer from the edge of the riparian vegetation.
• Improvements are proposed to the existing southern structure (including painting, re-roofing, and upgrades to existing features) which is located immediately adjacent to the riparian area, within the 50-foot buffer.
• Additionally, the southwest portion of the southern structure would be entirely replaced, and this structure is located within the 50-foot buffer from a riparian ESHA.
The MND includes a number of mitigation measures which would minimize these impacts in compliance with the Certified LCP, and the staff report includes Special Condition 1 to ensure that all mitigation measures are met by the project. Additionally, the Biologist prepared a subsequent Memo regarding steelhead and Coho which recommends 4 additional special conditions to mitigate potential impacts to Coho Salmon to a less than significant level and for conformance with the City’s Certified LCP. The relevant mitigation measures from Special Condition 1 include the following:
Biological Mitigation Measures from the MND, which are incorporated into Special Condition 1.
BIO IMPACT 1: Approximately 0.07-acre of the undeveloped 100-foot buffer will be permanently impacted through development of the rental units and a parking lot. Approximately 0.04-acre of the undeveloped buffer will be temporarily impacted from grading and land disturbance during construction. Temporary impacted areas will return to pre-construction conditions (i.e., non-native herbaceous vegetation) following construction.
The following mitigation measures will reduce the potential impacts to the riparian 50-to 100-foot buffer and allow the Project to meet the Required Findings:
MM BIO-1a: The riparian buffer shall be enhanced through plantings of native shrubs and management of invasive species. A plant palette of suitable native species is included in Table 2 STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
below4. The area of enhancement shall be a 25-foot-wide strip adjacent to the Project Area within the undeveloped 50-foot riparian buffer. The intention of the planting is to create a minimum fifty (50) percent absolute cover of the 25-foot-wide buffer with native shrubs once plants reach maturity.
Implementation of plantings/irrigation/management should be overseen by landscape professionals with experience planting and maintaining native species. Invasive species shall include any Cal-IPC ‘High’ plants and will not include grass species5. Management of invasive species shall be conducted for three (3) years. Invasive species observed, or which may occur in the Study Area, and should be target species that are managed are included in Table 3.
Table 2. Native Planting Palette
Common Name Scientific Name
Wax myrtle Morella californica
California blackberry Rubus ursinus
Coyote bush Baccharis pilularis
California coffeeberry Frangula californica ssp. californica Sword fern Polystichum munitum
Red elderberry Sambucus racemosa
Oso berry Oemleria cerasiformis
Silk tassel Garrya elliptica
Table 3. Target Invasive Species
Common Name Scientific Name
English Ivy Hedera helix
Cape ivy Delairea odorata
Himalayan blackberry Rubus armeniacus
Pampas grass Cortaderia spp.
Periwinkle Vinca major
Sources for locally sourced native plantings includes Jughandle Farm Nursery, Mendocino Coast Botanical Gardens, Samara Restoration.
Control of invasive grass species is highly challenging, and that level of restoration is determined not necessary for this project due to existing conditions and proposed Project.
MM Bio 1b: Only native plant species shall be included in landscaping within the 100-foot riparian buffer.
BIO IMPACT 2: Land disturbance activities may create conditions which could cause erosion, sediment deposition, or pollution into riparian vegetation and/or Arena Creek.
MM BIO 2a: Land disturbance activities will occur during the general dry season June 1 through October 15. Erosion control measures (i.e., weed-free, jutes straw waddle, weed-free straw bales, silt fencing, tarps) shall be staged on-site prior or at initiation of land disturbance activities in case rain-event may occur.
MM BIO 2b: If a rain event in excess of 0.25-inch over a 24-hour period occurs during the construction phase, all activities shall cease for 24 hours after perceptible rain ceases. Erosion control measures (e.g., weed-free straw waddle, weed-free straw bales, cover bare soil) shall be deployed in the event of unseasonable rains.
MM BIO 2c: Spill prevention materials shall be on-site for all materials and equipment; all construction personnel shall stop work and deploy spill prevention materials in the event of escaped STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
petrol, oil, solvents, paints, etc. No equipment or other materials which may cause pollution to the riparian/stream shall be stored or staged within the 100-foot riparian buffer.
MM BIO 2d: To minimize soil and vegetation disturbance within the buffer, temporary fencing shall be placed at the edge of land disturbance activities and outside the 50-foot buffer. No land disturbance or material/equipment staging shall occur outside the fencing and construction staff will be informed on the purpose of the fencing. Fencing shall be removed upon completion of the Project.
BIO IMPACT 3: Installation and removal of scaffolding around existing structures will occur in riparian vegetation. Existing riparian vegetation will be trampled for installation and for access during improvements. Scaffolding will reduce regular trampling for most of the vegetation as the vegetation will be located under the scaffolding. However, portions within the pathway for access to the scaffolding will be trampled regularly. Building improvements may introduce debris or pollutants (i.e., paint, etc.) into the riparian vegetation.
MM BIO 3a: Use of the scaffolding within riparian vegetation shall be limited to the minimum amount necessary to complete necessary improvements. Scaffolding shall be installed and removed with the fewest people possible and shall remain in place for the shortest duration feasible.
MM BIO 3b: Scaffolding shall be installed and used in riparian vegetation at the driest portion of the dry season, as feasible. Natural wooden boards (i.e., not treated) shall be laid down along the access path to scaffolding within riparian vegetation.
MM BIO 3c: Construction netting shall be installed to capture any debris which may fall from the structures or scaffolding. Appropriate equipment and methods for any potential pollutant materials (i.e., paint, etc.) which are to be applied to the structures shall be used in a manner which will reduce drift, leaking or spillage. Any debris which may fall on the ground shall be removed by the end of the workday.
MM BIO 3d: No herbaceous riparian vegetation shall be removed, and no woody riparian vegetation shall be limbed or otherwise removed.
BIO IMPACT 4: California red-legged frog or western pond turtle may utilize the undeveloped portion of the Project Area or riparian habitat as upland dispersal habitat during the rainy season or as upland refugia during the dry season; if CRLF is present, then “take” of CRLF may occur. Use of existing developed land by CRLF or WPT is unlikely.
MM BIO 4a: All land disturbance of undeveloped land, including woody vegetation removal, shall occur during the dry season (June 1 through October 15) when special-status wildlife species are less likely to be dispersing.
MM BIO 4b: A qualified biologist shall conduct a pre-construction survey no more than 24 hours prior to initiation of land disturbance. The biologist shall inspect gopher holes and any other potential upland refugia where CRLF or WPT may occur. If CRLF is found, the qualified biologist shall follow instructions outlined on the USFWS Technical Assistance Letter (Appendix F). If WPT is found, the qualified biologist shall consult with CDFW.
MM BIO 4c: A biological education program shall be provided by a qualified biologist to all personnel that will be present at the site during ground disturbance and related activities. Following worker education, each construction work member present is anticipated to have the information needed to identify each species and be relied upon to follow measures should a CRLF or WPT be observed.
The worker education program shall include information regarding the identification and natural history of each species (including photographs), the potential for occurrence of each species within work areas, protocols to be followed for daily surveys, the legal status and the ramifications for take, the purpose of the exclusion fencing and importance of maintaining it, and specific measures being implemented to avoid impacts to each species. Contact information for USFWS staff and Project biologist shall be provided during the training.
MM BIO 4d: Trained workers shall conduct daily surveys for CRLF in the Project Area prior to daily work. If CRLF is observed in the course of pre-construction or daily surveys or during work, all STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
ground disturbance shall halt and USFWS and Project biologist shall be notified immediately. The CRLF shall be addressed as outlined in the USFWS Technical Memo (bullet point 3).
MM BIO 4e: If WPT is observed in the course of construction activities, all ground disturbance shall halt, and the Project biologist shall be notified immediately. Construction activities shall resume once the WPT has exited the area of active construction and is out of harm’s way.
MM BIO 4f: All ground disturbing activities shall cease for 24 hours following a rainfall event where
0.25- inches or greater of precipitation within a 24-hour period was predicted for the Point Arena area.
MM BIO 4g: Symbolic fencing and signs shall be installed following completion of the Project to discourage human or pet entry into the buffer, riparian vegetation, and stream.
MM BIO 4h: All CRLF conditions outlined in the USFWS Technical Assistance Letter shall be observed.
BIO IMPACT 5: Construction related activity and sound may disturb nesting special-status birds in the riparian vegetation. In addition to the special-status bird, a variety of non-status bird species with baseline protections under the Migratory Bird Treat Analysis (MBTA) and CFGC may use trees and shrubs within the Study Area for nesting.
MM BIO 5a: Tree/vegetation removal and initial ground disturbance shall occur from August 16 to January 31, outside of the general bird nesting season. If tree/vegetation removal during this time is not feasible, a pre-construction nesting bird survey should be performed by a qualified biologist no more than 7 days prior to the initiation of tree removal or ground disturbance. The survey should cover the Project Area and surrounding areas within 100 feet. If active bird nests are found during the survey, an appropriate no- disturbance buffer should be established by the qualified biologist.
Once it is determined that the young have fledged (left the nest) or the nest otherwise becomes inactive (e.g., due to predation), the buffer may be lifted, and work may be initiated within the buffer.
If land disturbance or vegetation removal ceases for longer than 14 days, another nesting survey should be conducted prior to beginning such activities (if within nesting bird season), as nests may have been established during the time of no activity.
BIO IMPACT 6: Regulatorily Required Mitigation Measures.
MM BIO-6a: The applicant shall submit a revised site plan that does not include the proposed Windmill and the proposed windmill shall not be constructed as part of this project.
MM BIO 6b: That applicant shall submit a Building Permit for this project which does not include construction of the retaining wall along the southern edge of Building W/E 1 and Building W/E 2.
MM BIO-6c: prior to issuance of the building Permit, the applicant shall submit a landscaping plan that illustrates at least 14 native California trees. The trees shall be planted prior to approval of the building permit final.
Additionally, the City of Point Arena Municipal Code includes different regulations related to new development within an ESHA/ESHA buffer and the repair or replacement of existing development within an ESHA/ESHA buffer as follows:
Section 18.25.220 Development in or Adjacent to Environmentally Sensitive Habitat Area:
No new development shall be allowed within or adjacent to riparian corridors along Arena Creek, or other Environmentally Sensitive Habitat Areas where mapped (on the opportunities and constraints map: biological resources and trails) or other unmapped ESHAs that meet the ESHA criteria contained in Land Use Plan (LUP) Chapter X Section
2.4 without first obtaining appropriate permits. New development includes, but is not limited to, vegetation removal, grading, filling, soils or refuse dumping, and the alteration of creek banks. New development adjacent to ESHA shall provide native vegetation buffer areas to serve as transitional habitat and provide distance and physical barriers to human intrusion.
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
The buffer area shall be a minimum of 100 feet and shall be larger if necessary to protect the resources of the particular habitat area from possible significant degradation caused by the proposed development. No buffer may be less than 100 feet unless it can be demonstrated, based on the criteria below and after city consultation with the California Department of Fish and Wildlife, that 100 feet is not necessary to protect the resources of the particular habitat area from possible significant degradation caused by the proposed development. No buffer area may be less than 50 feet in width.
Pre-existing buildings and non-conforming uses within riparian buffer zones may continue as legally non-conforming, but no additions that encroach closer to the stream or creek shall be permitted, with the following exceptions contingent upon the four required findings described below:
1. Required Findings
a) The proposed development has been sited and designed to prevent significant impacts to the habitat values, functional capacity, and species diversity of the adjacent riparian habitat area.
b) The proposed development is compatible with the continuance of such habitat areas. c) Soils and vegetation removal and disturbances shall be minimized. d) Non-native vegetation shall not be planted except for the continuance of existing agricultural practices.
The proposed project includes repair and reconstruction of existing structures that are located within the 50-foot buffer area of the Red Alder ESHA and associated riparian area and perennial stream. The proposed work on the pre-existing buildings would not encroach further into the riparian buffer and thus can continue as legal non-conforming uses.
The applicant has proposed construction of a new 2-foot-high retaining wall which would encroach an additional foot into the buffer on the south side of the building. The eastern portions of the retaining wall do not encroach further into the ESHA or ESHA buffer. It may be difficult to make the findings with respect to the construction of the retaining wall along the south side of the Project’s buildings WE2 and WE1. The potential impacts of the construction of the retaining wall were included in the Biological Report which included mitigation measures to reduce the potential impacts of this construction to a less than significant impact. The MND included an additional Mitigation Measure BIO-6b to eliminate this section of the retaining wall from the project, as the General Plan Policy expressly prohibits the expansion of an existing structure further into an ESHA buffer.
Point Arena Mountain Beaver (PAMB). Section 5.24 of the Point Arena Zoning Code outlines requirements for developments located within PAMB and the Mountain Beaver Buffer Area. No sign of PAMB occupancy was found per the required Biological survey and a subsequent survey by USFWS in 2022. Through onsite surveys and USFWS consultation, the biological report concluded that PAMB is not present and no take of PAMB is anticipated from the project.
Western Pond Turtle (WPT). The WPT is the only native freshwater turtle in California. Turtles require suitable aquatic habitat for most of the year; however, WPT often occupies creeks, rivers, and coastal lagoons that become seasonally unsuitable. The Study Area contains a perennial stream which may provide suitable dispersal habitat. The riparian area along the stream is also suitable dispersal habitat.
Nesting on adjacent uplands is unlikely due to regular human activity, per the report. Per the MND, mitigation measures BIO-1a-b, BIO-2a-d, BIO 3a-d, BIO 4a-h and BIO 5a would reduce impacts to specialstatus species and comply with the City’s Certified LCP (Zoning Code and General Plan).
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
Birds and Bats. The Biologist who prepared the Biological Report did not notice that the project site plan includes a windmill. The proposed windmill would be 40 feet and has the potential to impact both birds and bats through accidental collisions. As this potential impact was not analyzed in the Biological Report, the applicant was provided the option of paying for an additional report that would analyze potential impacts to bird and bats or a mitigation measure would be required that would remove the windmill from the project.
The applicant chose to eliminate the windmill from the project per the MND’s Mitigation Measure BIO-6a.
Steelhead and Coho. Arena creek is present in the Study Area, with the top-of-bank (TOB) located immediately adjacent to existing developed areas that are proposed for remodeling. Arena Creek is identified as critical habitat for steelhead and coho, with documented occurrences of steelhead within the creek (CDFW 2024) and is considered essential fish habitat (NMFS 2024b). Arena Creek is likely to support rearing fish, including coho and steelhead. The species are described below.
Steelhead - Northern California Distinct Population Segment (DPS) (Onocorhynchus mykiss: steelhead), Federal Threatened, CDFW Species of Special Concern. The federal designation refers populations occurring below impassable barriers in coastal basins from Redwood Creek to, and including, the Gualala River. The state designation refers only to the summer-run. The majority of adult steelhead enter the river in the fall or winter and spawn in early winter or spring, although summerrun steelhead enter much earlier in late spring to early summer and spawn winter or spring. Spawn in cool, clear streams with high dissolved oxygen and gravel riffle substrate. Deeper pools with sufficient riparian cover for rearing are necessary for successful breeding.
Coho salmon - Central California Coast Evolutionarily Significant Unit(ESU) (O. kisutch: coho), Federal Endangered, State Endangered. The Central California Coast ESU includes all naturally spawned populations of coho salmon (and their progeny) in California streams from the Eel River to Aptos Creek, including the Russian River and its tributaries, excluding the Sacramento-San Joaquin River Basin. Coho salmon typically migrate in late fall to early winter to spawn in smaller coastal streams. Spawning migration known as “runs” occur throughout the year.
Most adult fish return “home” maintaining fidelity to their natal stream. Preferred spawning habitat for coho salmon is small freshwater streams with cool to cold water temperature, medium to small gravel substrate, and high dissolved oxygen levels at the head of a riffle where water changes from laminar flow to turbulent flow (providing greater dissolved oxygen). Abundant riffle areas (shallow areas with gravel substrate) for spawning and deeper pools with sufficient riparian cover for rearing are necessary for successful breeding. Spawning occurs mainly between November and January, but can occur as late as March during drought conditions.
WRA prepared a memo to specifically analyze the potential impacts of this project on salmonid populations (see Attachment X). The memo notes that “salmonoid critical life phases and migration events would happen outside of the work window recommended (in Special Condition 7) below.”
The Memo also includes a comprehensive Development Criteria Analysis based on the City of Point Arena Municipal Code 18.25.220 and 18.25.240. The project complies with the buffer analysis given the comprehensive list of mitigation measure required in the MND including Mitigation Measures BIO7A, BIO-7B, BIO-7C and BIO-7D.
BIO-7a: No construction related debris will be staged within the 50-foot buffer, or in areas where such debris may wash into the creek. Any refueling of equipment should also occur outside of the STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
100-foot riparian buffer.
BIO-7b: Under no circumstances should any wash water or wastewater from construction be allowed to enter Arena Creek.
BIO-7C: Construction netting or tarps should be installed beneath scaffolding along the creek to capture any debris which may fall from the structures or scaffolding, preventing it from entering Arena Creek. Appropriate equipment for application of materials (i.e., paint, etc.) which is to be applied to the structures should be used. The manner in which materials are applied should be the least likely to cause drift, leaking or spillage. Any debris which may fall on the ground should be removed by the end of the workday.
BIO-7d: Land disturbance activities will occur during the general dry season June 1 through October
15. Erosion control measures (i.e., weed-free jutes straw waddle, weed-free straw bales, silt fencing, tarps) should be staged and installed on-site prior or at initiation of land disturbance activities in case rain-event may occur.
WATER QUALITY
As illustrated in the Table below the Project would result in 42 percent of the site being covered in impervious surfaces and 57 percent of the site being covered in pervious surfaces. This is a small reduction in the overall impervious surfaces on the site. The prior development had 60 percent of the site covered in impervious surfaces. Therefore, the Project would result in a slight decrease in stormwater runoff from the site.
Section 5.34 of the Point Arena Zoning Code requires:
Proposed Project Square Feet %
Building Footprints 9,343 18.16%
Parking & Driveways 12,747 24.78%
Total Impervious Area 22,090 42.94%
Landscaped Areas 9,729 18.91%
Open Space 6,445 12.53%
ESHA – Protected Open Space 13,180 25.62%
Total Pervious Area 29,354 57.06%
Total 51,444 100.00%
Prior Project SF %
Prior Development Foot print 31,233 60.71%
Prior Pervious Area 20,211 39.29%
Total 51,444 100.00%
Wildflower East - Total SF of Project Components and
Impervious Surfaces Prior and Proposed
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
All development shall be evaluated for potential adverse impacts to water quality, and the applicant shall incorporate Site Design, Source Control, and, where required, Treatment Control Best Management Practices (BMPs) to minimize polluted runoff and water quality impacts resulting from the development.
Site Design and Source Control BMPs are required for all development. In addition, all proposed “Developments of Special Concern” as described in 5.34(B) require the submittal of a Water Quality Management Plan (WQMP) that evaluates whether the development’s Site Design and Source Control measures have adequately minimized post construction impacts to water quality, or whether structural Treatment Control BMPs are also necessary.
The zoning code includes the following types of “Development of Special Concern” that apply to the project:
• Re-development project that results in the creation, addition, or replacement of 5,000 SF or more of impervious surface area on an already developed site.
• Parking lot of 5,000 SF or more of impervious surface area, or with 25 or more parking spaces.
Therefore, the project is a “Development of Special Concern” and a Water Quality Management Plan is recommended as a condition of approval of the project. Per Section 5.34(B) of the Point Arena Zoning Code, the Water Quality Management Plan must be certified by a California Registered Civil Engineer and approved by the City. Information to be included in the Water Quality Management Plan is clearly outlined in Section 5.34(B) of the Point Arena Zoning Code.
Special Condition 2: Prior to issuance of the Coastal Development Permit, the applicant shall submit a Water Quality Management Plan, certified by a Registered Civil Engineer, to be approved by the City. The Water Quality Management Plan shall contain all pertinent information as outlined in Section 5.34(B) of the Point Arena Zoning Code.
ARCHITECTURAL/HISTORICAL and ARCHEOLOGICAL RESOURCES
Archeological & Cultural Resources. During the autumn of 2023, William Rich and Associates (WRA) completed a cultural resources survey at Assessor’s Parcel Numbers (APN) 027-122-020 and 027-122- 021, at 135 Main Street and 165 Main Street in Point Arena, Mendocino County, California. No archaeological resources were found on site. The MND includes two Mitigation Measures which address unexpected discoveries of cultural or human remains, which are also part of Special Condition 1.
Historic Buildings. The project archaeologist found that buildings which formerly constituted the Sea Shell Inn and the former gas station do not qualify as a historical resource for the purposes of CEQA (15064.5 (a)). The original hotel at this location was in place by 1946; it was expanded around 1970 and operated as the Sea Shell Inn until it closed in 2011, after which it was partially demolished. The former Standard Oil Station building, at 165 Main Street, is within the Point Arena Main Street Historic Commercial District (NRHP #90001364). This building remains standing and is being remodeled consistent with its architectural merits described in the District record by Napoli and Lortie (1990) and will remain in use as a commercial storefront. All other buildings in the survey area that remain standing were built after the period of significance of the District (1893-1940), and thus do not appear to contribute to the significance of the District, nor would be considered individually eligible for listing.
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
UTILITIES
Wastewater. The site is located within the City’s Wastewater District. The project is expected to increase sewer use by 37 ESD (Equivalent Standard Dwelling) over the current use (see Table 3 below).
Table 3: Water & Wastewater Calculations for Wildflower East User Category ESD/Unit Proposed
# of Unit Total ESD Gal/Unit Unit Description
Apartment 1 4 4 200 gal/d per 1-2
bdrm. residence
Hotel Dwelling Unit w/ kit. 0.8 5 4 160 gal/d per unit
Hotel Sleeping Unit w/o kit.,
laundry 0.8 20 16 160 gal/d per unit
Full Service Restaurant w/o bar 0.0145 940 13.63 2.9 gal/d/ft2 dining area
Total 37.63 4,040
Water Services. The site is located within the Point Arena Water Works service district (PAWW), which is a private water company that provides potable water within its service area, which is the same as the City boundary. PAWW is a Class D water utility, having less than 500 connections. PAWW is under the jurisdiction of the California Public Utilities Commission (CPUC). The project was referred to PAWW, which responded with no comment.
TRANSPORTATION/CIRCULATION
The eventual build-out of all existing and potential new parcels and their traffic load was analyzed during the General Plan and Zoning Ordinance update. The existing roadway system was deemed to be adequate to serve the probable future demand of existing and Principally Permitted Uses. Most of this project is principally permitted. Only the four residential units require a conditional use permit and this is not sufficient development to impact the City’s roadway system.
The project was referred to the Consulting City Engineer, Jason Island of SHN Consulting, who responded with no comment regarding the project.
The Project was referred to Caltrans for comment and review for consistency with their requirements.
Caltrans reviewed the Project and they requested that the commercial driveway be a minimum of 25 feet but no wider than 35 feet. The Project applicant has proposed a driveway of 28 feet in width, which is closer to the preferred minimum recommended by Caltrans. Additionally, the Project fronts SR1, which provides 16-foot sidewalks along the parcel frontage, exceeding Caltrans’ preferred minimum sidewalk width of 6 feet.
The MND analyzes total vehicle miles traveled for the proposed project and concluded that the project would not have a significant impact on vehicle miles traveled.
LOT LINE ADJUSTMENT
The applicant has submitted a Lot Line Adjustment map and revised legal description for each parcel as required for a lot line adjustment. That map includes a mutual easement which is required so that each parcel provides shared access to the proposed shared parking for the site. The plan also includes a legal STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
description of this shared easement. The applicant will need to submit the map and legal description to the County recorder upon approval of the Lot Line Adjustment and respond to any required Special Conditions in the staff report which might require changes to the map and/or legal description.
Each parcel can be served directly by utilities (power, water, sewer, drainage), and no utility easements are required for the project.
If approved, the proposed Lot Line Adjustment would ensure that no new non-conforming setbacks are created as a consequence of the Lot Line Adjustment. Additionally, the new lot configuration will make the setbacks for the two buildings on resulting Parcel A more conforming (see Figure 2 and 3 below).
Additionally, as noted earlier in this report, the proposed parcels would comply with minimum lot width and size requirements which are enumerated in the zoning code (see page 5).
Figure 2: Existing Parcel Lines Figure 3: Proposed Parcel Lines RECOMMENDED ACTION:
Hold a hearing, receive public testimony, deliberate and adopt:
1. RESOLUTION OF THE CITY COUNCIL OF THE CITY OF POINT ARENA,
CALIFORNIA CERTIFYING THE MITIGATED NEGATIVE DECLARATION FOR THE WILDFLOWER WEST PROJECT (SCH: 2024040981);
ADOPTING THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
FINDINGS; AND ADOPTING A MITIGATION MONITORING AND
REPORTING PROGRAM
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
2. RESOLUTION OF THE POINT ARENA CITY COUNCIL
APPROVING A USE PERMIT, COASTAL DEVELOPMENT PERMIT AND LOT
LINE ADJUSTEMENT FOR THE WILDFLOWER EAST PROJECT LOCATED AT 135 AND 165 MAIN STREET.
Staff Report Prepared By:
___________________________ _______________________________________ Date Marie Jones
Consulting City Planner
Attachments:
1. Resolution of the City Council of the City of Point Arena Certifying the Mitigated Negative Declaration for the Wildflower West Project (Sch: 2024040981); Adopting the California Environmental Quality Act Findings; and Adopting the Mitigation Monitoring and Reporting Program
2. Resolution of the Point Arena City Council Approving a Use Permit (UP 24-1), Coastal Development Permit (CDP 23-1) and Lot Line Adjustment (LLA 24-1) for the Wildflower East Project Located at 135 and 165 Main Street.
3. Mitigated Negative Declaration for Wildflower East Hotel
4. Mitigation Monitoring and Reporting Plan
5. Wildflower East Biological Survey and ESHA Report
6. Addendum to the Biological Survey and ESHA Report - Salmon Letter
7. Wildflower East Project Plans
8. Agency Comment Letters
9. Public Comments Letters
STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
SUMMARY OF REFERRAL AGENCY COMMENTS:
City Engineer/Public Works No comment.
Point Arena Water Works No comment.
County Assessor No response.
Coastal Commission No response.
Redwood Coast Fire Protection No comment.
Environmental Health – Mendo County The facility will need to submit an application to Operate a Food Facility to reopen the restaurant. The application packet should include the menu, new equipment specification sheets, and floor plans. Depending on the scope of work in the kitchen, a Major or Minor Plan Check may be required. If the applicant has any further questions for the permitting process or fees associated with operating a Food Facility, they are welcome to contact Environmental Health.
Building Inspection – Mendo County The County of Mendocino Building Department approves the requested items for this proposed project currently, contingent upon Planning approval.
All proposed items mentioned in the request are required to have detailed plans and calculations submitted prior to the issuance of any building permits.
Air Quality Management District No response.
Caltrans We encourage the applicant to widen the sidewalks, if possible. Caltrans has a goal to widen sidewalks beyond the minimum six-foot-wide standard to a more functional eight-feet wide, where possible (exclusive of curb) on all projects. The traffic circulation on-site and within the adjacent public rights of way seems acceptable, however, we request that the driveway width be evaluated to determine whether it should be narrowed. A commercial driveway should be a minimum of 25-feet and no wider than 35- feet in width but should be no wider than necessary to accommodate turning vehicles. If the driveway on SR 1 will be relocated from its current location, the driveway will need to be built to State standards and unnecessarily wide areas of driveway must be converted to sidewalk. Any work within Caltrans Right-of-Way will require an Encroachment Permit from Caltrans.
Regional Water Quality Control Board Provided comments on the MND which have been addressed in the Staff Report.
California Historical Resources Info Required the applicant to complete an Archaeological Study, and noted that the proposed project area contains a recorded building at165 Main Street [5468-0003-0001]. This building has a status code of 1D, meaning it is a contributor to a district listed in the National Register by the Keeper. In addition, the proposed project area is located within the boundary of the National Register-listed Main Street Historic Commercial District [NPS90001364-9999]. Prior to commencement of project activities, it is recommended that these resources be assessed by a qualified professional familiar with the architecture and history of Mendocino County.
USFWS Completed a PAMB survey and submitted a survey letter. “The subject property contains potentially suitable PAMB habitat only along its southern edge along Point Arena Creek. Additional suitable habitat occurs south of the subject property across Point Arena Creek on an adjacent private parcel containing a residence. All suitable habitat within 100 feet of the proposed activities were surveyed for PAMB occupancy except for a portion of the private property immediately south of the subject parcels that had "No Trespassing" signs. However, this unsurveyed area included the residence mentioned above, and was mowed and occupied by dogs, thus unlikely to be suitable for or occupied by PAMB. No sign of PAMB occupancy was found during a 1.25-h presence-absence survey conducted by three STAFF REPORT CDP# 2023-01, Use Permit# 2024-01 (Hansen) June 25, 2024
CC-1
Service-trained surveyors within suitable PAMB habitat. Accordingly, the Service has determined that the project as described is unlikely to result in incidental take of PAMB, and can proceed at any time.”
- 1 -
RESOLUTION NO. PC -2022
RESOLUTION OF THE POINT ARENA CITY COUNCIL
APPROVING A USE PERMIT, COASTAL DEVELOPMENT PERMIT AND LOT LINE ADJUSTEMENT FOR THE WILDFLOWER EAST PROJECT LOCATED AT 135 AND 165 MAIN STREET
WHEREAS, 610 LLC/ Jeffrey Hansen (“Applicant”), submitted an applicant for a Coastal Development Permit, Use Permit and Lot Line Adjustment to transfer 0.145 acres (6,316.2 SF) from Parcel B (APN 027-122-21) to Parcel A (027-122-20), and a Coastal Development Permit and Use Permit to: 1) reestablish a residential use and reuse a building for a restaurant and construct a 280 SF trellis on Parcel A; 2) reestablish and rehabilitate lodging, restaurant, and residential use on Parcel B, 3) demolish existing 3,880 SF structure on Parcel B; 4) construct five (5) detached lodging units of 160 SF each on Parcel B and; 6) other associated site work as demonstrated on the project plans; and
WHEREAS, 135 and 165 Main Street Point Arena, California (Assessor Parcel Numbers: 027-122-20 and -21) is in the Highway Commercial zoning district and no changes to the site’s current zoning designation are proposed under the Project; and WHEREAS, the Project is subject to the Point Arena General Plan and zoning ordinance; and
WHEREAS, the City Council held a duly noticed public hearing on June 25, 2024, to consider the Project, accept public testimony; and
WHEREAS, the California Environmental Quality Act (CEQA), together with State guidelines and City environmental regulations, require that certain projects be reviewed for environmental impacts and that environmental documents be prepared; and WHEREAS, staff prepared an MND to evaluate the impact of the proposed project on the environment pursuant to CEQA and Title 14, California Code of Regulations, Section 15074 et seq. ("CEQA Guidelines"); and WHEREAS, the MND (State Clearinghouse No. 2024040981) was circulated for more than the required 30-day public review and comment period, beginning on April 23, 2024 and ending on June 25, 2024; and
WHEREAS, during this period, on June 25, 2024, a public hearing was held by the City Council to receive comments on the MND in accordance with the provisions of the Point Arena Zoning Ordinance; and
NOW, THEREFORE, BE IT RESOLVED that the City of Point Arena City Council, based on the entirety of the record before it, which includes without limitation, CEQA, Public Resources Code §21000, et seq. and the CEQA Guidelines, 14 California Code of Regulations §15000, et seq.; the Point Arena General Plan; the Point Arena zoning code; the Project applications; all site plans, and all reports and public testimony submitted as part of the City Council meeting of June 25, 2024 and City Council deliberations; and any - 2 -
other evidence (within the meaning of Public Resources Code §21080(e) and §21082.2), the City Council of the City of Point Arena does hereby make the following findings and determinations:
Section 1. Findings for approval of Use Permit to allow the operation of four apartment units.
1.That the proposed use at the size and intensity contemplated, and at the proposed location, will provide a development that is necessary or desirable for, and compatible with, the neighborhood or the community; and
2.That such use as proposed will not be detrimental to the health, safety, convenience or general welfare of persons residing or working in the vicinity, or injurious to property, improvements or potential development in the vicinity, with respect to aspects including but not limited to the following:
a) The nature of the proposed site, including its size and shape, and the proposed size, shape and arrangement of structures; and b) The accessibility and traffic pattern for persons and vehicles, and the type and volume of such traffic, and the adequacy of proposed off-street parking and loading; and
c) The safeguards afforded to prevent noxious or offensive emissions such as noise, glare, dust and odor; and
d) Treatment given, as appropriate, to such aspects as landscaping, screening, open spaces, parking and loading areas, service areas, lighting and signs; and
3. That such use or feature as proposed will comply with the applicable provisions of this ordinance, will be consistent with the policies and programs of the General Plan and will assist in carrying out and be in conformity with the Point Arena Coastal Program; and
4. That the proposed use or feature will have no significant adverse environmental impact or there are no feasible alternatives, or feasible mitigation measures, as provided in the California Environmental Quality Act, available which would substantially lessen any significant adverse impact that the actions allowed by the conditional use permit may have on the environment; and
5. When the subject property is located between the sea and the first public road paralleling the sea or within 300 feet of the inland extent of any beach or of the mean high tide line where there is no beach, whichever is the greater, that:
a) The development provides adequate public access from the nearest public roadway to the shoreline and along the coast and/or does not interfere with such uses already in existence; and
b) The development adequately protects public views from any public road or from a recreational area to, and along, the coast; and c) The development is compatible with the established physical scale of the area; and
d) The development does not significantly alter existing natural landforms; and
e) The development complies with shoreline erosion and geologic setback requirements.
- 3 -
6. That the remainder of the project is composed of permitted uses that are permitted by right in Highway Commercial Zoning District.
Section 2. Findings for approval of a Coastal Development Permit to allow the entire project and Lot Line Adjustment
1. The proposed development as described in the application and accompanying materials, if constructed as modified by any conditions of approval is in conformity with the city of Point Arena’s certified local coastal program, will not adversely affect coastal resources; and
2. Feasible mitigation measures and/or alternatives have been incorporated to substantially lessen any significant adverse effects of the development on the environment and will not have any significant adverse impacts on the environment within the meaning of the California Environmental Quality Act; and
3. The proposed use is consistent with the purposes of the zone in which the site is located; and
4. The proposed development is in conformance with the City of Point Arena’s general plan; and
5. The project, as proposed, will have no significant adverse scenic or visual impacts due to project design, location on the site or other reasons;
6. The project, as conditioned, will not have significant adverse scenic or visual impacts due to required project modifications, landscaping or other conditions;
7. The project, as proposed or as conditioned, is the least environmentally damaging alternative;
8. The proposed location of the use and conditions under which it may be operated or maintained will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity;
9. Services, including, but not limited to, water supply, sewage disposal, solid waste, and public roadway capacity have been considered and are adequate to serve the proposed development;
The Project is also subject to the following general findings and determinations, based on analysis and testimony presented at the June 25, 2024 hearing, incorporated herein:
1. The foregoing recitals are true and correct and made a part of this Resolution;
2. The documents and other material constituting the record for these proceedings are located at the Planning Department;
3. The proposed project is consistent with the purpose and intent of the zoning district, as well as all other provisions of the General Plan, the Zoning Code and the Certified LCP;
4. The design, location, size, and operating characteristics of the proposed activity are compatible with the existing and future land uses in the vicinity;
5. The site is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle (e.g., fire and - 4 -
medical) access and public services and utilities (e.g., fire protection, police protection, potable water, schools, solid waste collection and disposal, storm drainage, wastewater collection, treatment, and disposal, etc.), to ensure that the type, density, and intensity of use being proposed would not endanger, jeopardize, or otherwise constitute a hazard to the public interest, health, safety, convenience, or welfare, or be materially injurious to the improvements, persons, property, or uses in the vicinity and zoning district in which the property is located.
BE IT FURTHER RESOLVED that the Point Arena City Council does hereby approve the Use Permit, Coastal Development Permit and Lot Line Adjustment to allow:
1. The transfer 0.145 acres (6,316.2 SF) from Parcel B (APN 027-122-21) to Parcel A (027-122-20); and
2. Reestablish a residential use and reuse a building for a restaurant and construct a 280 SF trellis on Parcel A; and
3. Reestablish and rehabilitate lodging, restaurant, and residential use on Parcel B as demonstrated on the project plans; and
4. Demolish an existing 3,880 SF structure on Parcel B;
5. Construct five (5) detached lodging units of 160 SF each on Parcel B and;
6. Other associated site work as demonstrated on the project plans.
Subject to the following conditions and the Mitigations enumerated in the project MND:
SPECIAL CONDITIONS
1: The applicant shall implement all mitigation measures required in the MND, which include the following:
AES-1: Prior to issuance of a building permit for this Project, the applicant shall submit an exterior lighting plan showing the location of all exterior lights and the manufacturer and type of lighting fixtures proposed. Lights and light fixtures shall be downcast and shielded to prevent offsite light trespass. The exterior lighting plan shall be reviewed and approved by the City in conjunction with building permit review.
AQ-1: The Project comply with the following mitigation measures set forth by the Mendocino County Air Quality Management District to control fugitive dust generated during construction activities:
1. All visibly dry disturbed soil and road surfaces shall be watered to minimize fugitive dust emissions.
2. Earth or other material tracked onto neighboring paved roads shall be removed promptly.
3. Approved chemical soil stabilizers shall be applied to exposed earth surfaces in inactive construction areas and exposed stockpiles (i.e., sand, gravel, dirt).
4. Dust generating activities shall be limited during periods of high winds (over 15 mph).
5. Access of unauthorized vehicles onto the construction site during non-working hours shall be prevented.
6. A daily log shall be kept of fugitive dust control activities.
AQ-2: The Project shall comply with Regulation 4, Rule 4.1-400 of the MCAQMD related to prohibitions on woodburning, including the following:
1. 4.1-400(a) No person shall install an open wood burning fireplace in any new residential, commercial, or public building or accessory building, or as part of a renovation of any residential, commercial, or public building or accessory building.
- 5 -
2. 4.1-400(b) No person shall install a wood-fired outdoor boiler to provide heat for any residential, commercial, or public building or accessory building.
3. 4.1-400(c) No person shall install wood burning appliances in any new, remodeled or renovated multi- family residence, commercial or public building or accessory building, except as a replacement for an existing wood burning appliance.
BIO-1a: The riparian buffer shall be enhanced through plantings of native shrubs and management of invasive species. A plant palette of suitable native species is included in Table 2 below. The area of enhancement shall be a 25-foot-wide strip adjacent to the Project Area within the undeveloped 50-foot riparian buffer. The intention of the planting is to create a minimum fifty (50) percent absolute cover of the 25-foot-wide buffer with native shrubs once plants reach maturity.
Implementation of plantings/irrigation/management should be overseen by landscape professionals with experience planting and maintaining native species.
Invasive species shall include any Cal-IPC ‘High’ plants and will not include grass species. Management of invasive species shall be conducted for three (3) years.
Invasive species observed, or which may occur in the Study Area, and should be target species that are managed are included in Table 3.
Table 2. Native Planting Palette
Common Name Scientific Name
Wax myrtle Morella californica
California blackberry Rubus ursinus
Coyote bush Baccharis pilularis
California coffeeberry Frangula californica ssp. californica Sword fern Polystichum munitum
Red elderberry Sambucus racemosa
Oso berry Oemleria cerasiformis
Silk tassel Garrya elliptica
Table 3. Target Invasive Species
Common Name Scientific Name
English Ivy Hedera helix
Cape ivy Delairea odorata
Himalayan blackberry Rubus armeniacus
Pampas grass Cortaderia spp.
Periwinkle Vinca major
Sources for locally sourced native plantings includes Jughandle Farm Nursery, Mendocino Coast Botanical Gardens, Samara Restoration.
Control of invasive grass species is highly challenging, and that level of restoration is determined not necessary for this project due to existing conditions and proposed Project.
BIO-1b: Only native plant species shall be included in landscaping within the 100-foot riparian buffer.
- 6 -
BIO-2a: Land disturbance activities will occur during the general dry season June 1 through October 15. Erosion control measures (i.e., weed-free, jutes straw waddle, weedfree straw bales, silt fencing, tarps) shall be staged on-site prior or at initiation of land disturbance activities in case rain-event may occur.
BIO-2b: If a rain event in excess of 0.25-inch over a 24-hour period occurs during the construction phase, all activities shall cease for 24 hours after perceptible rain ceases. Erosion control measures (e.g., weed-free straw waddle, weed-free straw bales, cover bare soil) shall be deployed in the event of unseasonable rains.
BIO-2c: Spill prevention materials shall be on-site for all materials and equipment; all construction personnel shall stop work and deploy spill prevention materials in the event of escaped petrol, oil, solvents, paints, etc. No equipment or other materials which may cause pollution to the riparian/stream shall be stored or staged within the 100-foot riparian buffer.
BIO-2d: To minimize soil and vegetation disturbance within the buffer, temporary fencing shall be placed at the edge of land disturbance activities and outside the 50-foot buffer. No land disturbance or material/equipment staging shall occur outside the fencing and construction staff will be informed on the purpose of the fencing. Fencing shall be removed upon completion of the Project.
BIO-3a: Use of the scaffolding within riparian vegetation shall be limited to the minimum amount necessary to complete necessary improvements. Scaffolding shall be installed and removed with the fewest people possible and shall remain in place for the shortest duration feasible.
BIO-3b: Scaffolding shall be installed and used in riparian vegetation at the driest portion of the dry season, as feasible. Natural wooden boards (i.e., not treated) shall be laid down along the access path to scaffolding within riparian vegetation.
BIO-3c: Construction netting shall be installed to capture any debris which may fall from the structures or scaffolding. Appropriate equipment and methods for any potential pollutant materials (i.e., paint, etc.) which are to be applied to the structures shall be used in a manner which will reduce drift, leaking or spillage. Any debris which may fall on the ground shall be removed by the end of the workday.
BIO-3d: No herbaceous riparian vegetation shall be removed, and no woody riparian vegetation shall be limbed or otherwise removed.
BIO-4a: All land disturbance of undeveloped land, including woody vegetation removal, shall occur during the dry season (June 1 through October 15) when special-status wildlife species are less likely to be dispersing.
BIO-4b: A qualified biologist shall conduct a pre-construction survey no more than 24 hours prior to initiation of land disturbance. The biologist shall inspect gopher holes and any other potential upland refugia where CRLF or WPT may occur. If CRLF is found, the qualified biologist shall follow instructions outlined on the USFWS Technical Assistance Letter (Appendix F). If WPT is found, the qualified biologist shall consult with CDFW.
BIO-4c: A biological education program shall be provided by a qualified biologist to all personnel that will be present at the site during ground disturbance and related activities. Following worker education, each construction work member present is anticipated to have the information needed to identify each species and be relied upon to follow measures should a CRLF or WPT be observed. The worker education - 7 -
program shall include information regarding the identification and natural history of each species (including photographs), the potential for occurrence of each species within work areas, protocols to be followed for daily surveys, the legal status and the ramifications for take, the purpose of the exclusion fencing and importance of maintaining it, and specific measures being implemented to avoid impacts to each species. Contact information for USFWS staff and Project biologist shall be provided during the training.
BIO-4d: Trained workers shall conduct daily surveys for CRLF in the Project Area prior to daily work. If CRLF is observed in the course of pre-construction or daily surveys or during work, all ground disturbance shall halt and USFWS and Project biologist shall be notified immediately. The CRLF shall be addressed as outlined in the USFWS Technical Memo (bullet point 3).
BIO-4e: If WPT is observed in the course of construction activities, all ground disturbance shall halt, and the Project biologist shall be notified immediately. Construction activities shall resume once the WPT has exited the area of active construction and is out of harm’s way.
BIO-4f: All ground disturbing activities shall cease for 24 hours following a rainfall event where 0.25- inches or greater of precipitation within a 24-hour period was predicted for the Point Arena area.
BIO-4g: Symbolic fencing and signs shall be installed following completion of the Project to discourage human or pet entry into the buffer, riparian vegetation, and stream.
BIO-4h: All CRLF conditions outlined in the USFWS Technical Assistance Letter shall be observed.
BIO-5a: Tree/vegetation removal and initial ground disturbance shall occur from August 16 to January 31, outside of the general bird nesting season. If tree/vegetation removal during this time is not feasible, a pre-construction nesting bird survey should be performed by a qualified biologist no more than 7 days prior to the initiation of tree removal or ground disturbance. The survey should cover the Project Area and surrounding areas within 100 feet. If active bird nests are found during the survey, an appropriate no- disturbance buffer should be established by the qualified biologist. Once it is determined that the young have fledged (left the nest) or the nest otherwise becomes inactive (e.g., due to predation), the buffer may be lifted, and work may be initiated within the buffer. If land disturbance or vegetation removal ceases for longer than 14 days, another nesting survey should be conducted prior to beginning such activities (if within nesting bird season), as nests may have been established during the time of no activity.
BIO-6a: The applicant shall submit a revised site plan that does not include the proposed Windmill and the proposed windmill shall not be constructed as part of this project.
BIO-6b: That applicant shall submit a Building Permit for this project which does not include construction of the retaining wall along the southern edge of Building W/E 1 and Building W/E 2.
BIO-6c: Prior to issuance of the building Permit, the applicant shall submit a landscaping plan that illustrates at least 14 native California trees. The trees shall be planted prior to approval of the building permit final.
BIO-7a: No construction related debris will be staged within the 50-foot buffer, or in areas where such debris may wash into the creek. Any refueling of equipment should also - 8 -
occur outside of the 100-foot riparian buffer.
BIO-7b: Under no circumstances should any wash water or wastewater from construction be allowed to enter Arena Creek.
BIO-7C: Construction netting or tarps should be installed beneath scaffolding along the creek to capture any debris which may fall from the structures or scaffolding, preventing it from entering Arena Creek. Appropriate equipment for application of materials (i.e., paint, etc.) which is to be applied to the structures should be used. The manner in which materials are applied should be the least likely to cause drift, leaking or spillage. Any debris which may fall on the ground should be removed by the end of the workday.
BIO-7d: Land disturbance activities will occur during the general dry season June 1 through October 15. Erosion control measures (i.e., weed-free jutes straw waddle, weedfree straw bales, silt fencing, tarps) should be staged and installed on-site prior or at initiation of land disturbance activities in case rain-event may occur.
CUL-1: If cultural or historic resources are encountered during construction activities, all onsite work shall cease in the immediate area and within a 50 foot buffer of the discovery location. A qualified archaeologist will be retained to evaluate and assess the significance of the discovery, and develop and implement an avoidance or mitigation plan, as appropriate. For discoveries known or likely to be associated with Native American heritage (precontact sites and select historic period sites), the tribal representatives listed in the Archaeological Report Section 6.2 shall be contacted immediately to evaluate the discovery and, in consultation with the project proponent, the County, and consulting archaeologist, develop a treatment plan in any instance where significant impacts cannot be avoided.
CUL 2 - In the event that human remains are encountered, all work must stop in the immediate vicinity of the discovered remains and the Mendocino County Medical Examiner, the Sheriff-Coroner, and a qualified archaeologist must be notified immediately to evaluate the remains. If the remains are deemed to be Native American and prehistoric, the Native American Heritage Commission must be contacted by the Coroner so that a “Most Likely Descendant” can be designated and further recommendations regarding treatment of the remains can be provided.
GEO-1: The Applicant shall submit a Soils Report with the Building Permit application for the components of the Project that require new construction. The Plan and Specifications for the foundations shall include consideration of soils in all engineering calculations per the State Building Code.
GEO-2: If paleontological resources, including individual fossils or assemblages of fossils, are encountered during construction activities all ground disturbing activities shall halt and a qualified paleontologist shall be procured to evaluate the discovery and make treatment recommendations.
HAZ -1:The Applicant shall cap the proposed landscaped area located between the residential structure on Parcel A and the parking lot to the south as illustrated in the site plan below. The cap shall be of non-permeable pavement such as a concrete patio.
- 9 -
HAZ-2: The Applicant shall submit a Soil Management Plan (SMP) approved by the Regional Water Board, prior to the start of earth moving activities, which details required precautions when doing any earthwork at this site.
HAZ-3: The Applicant shall record a Land Use Covenant (LUC) which states that the capped area, outlined below in red must be maintained as a capped area and cannot be turned into bare ground or landscaped or play areas in the future.
LU-1: Bicycle Parking. The applicant shall submit a site plan that includes bicycle parking of at least four spaces.
LU-2: Wood Fence. The applicant shall install a solid wood fence of 6 feet in height along the east property line and around the refuse container.
LU-3: Landscaping Plan. The applicant shall submit a Landscaping Plan for approval by the City Planner, prior to approval of the Building Permit which includes: 14 trees, at least 50% native plant cover and no potentially invasive species. The landscaping shall provide 90 percent coverage within five years.
LU-4: Retaining Wall Veneers. The Building Permit application shall illustrate veneers for the retaining walls that blend with the surrounding earth materials or landscape, as directed by the City Council.
NOI-1: Noise. During construction of the project, noise above 60 decibels must occur only between the hours of 7 a.m. and 8 p.m. Any equipment used that exceeds a noise level of 86 decibels, such as a nail gun or bulldozer, shall be limited to weekdays between 8 a.m. and 5 p.m.
2. Prior to issuance of the Coastal Development Permit, the applicant shall submit a Water Quality Management Plan, certified by a Registered Civil Engineer, to be approved by the City. The Water Quality Management Plan shall contain all pertinent information as outlined in Section 5.34(B) of the Point Arena Zoning Code.
STANDARD CONDITIONS
This action shall become final on the date of approval. No appeal periods apply. The permit shall expire and become null and void at the expiration of two years after the effective date, except where construction and use of the property in reliance on such permit has been initiated prior to its expiration.
1. To remain valid, progress towards completion of the project must be continuous. The applicant has sole responsibility for renewing this application before the expiration date. The City will not provide a notice prior to the expiration date.
2. The use and occupancy of the premises shall be established and maintained in conformance with the provisions of Title 18 of the Point Arena Municipal Code.
3. The application, along with supplemental exhibits and related material, shall be considered elements of this permit, and that compliance therewith is mandatory, unless an amendment has been approved by the City of Point Arena Planning Commission or its successor agency.
4. This permit shall be subject to the securing of all necessary permits for the proposed development from City, State and Federal agencies having jurisdiction.
5. The applicant shall secure all required building permits for the proposed project as required by the Building Inspection Division of the Mendocino County Department of Planning and Building Services.
- 10 -
6. This permit shall be subject to revocation or modification upon a finding of any one or more of the following:
a. The permit was obtained or extended by fraud.
b. One or more of the conditions upon which the permit was granted have been violated.
c. The use for which the permit was granted is conducted so as to be detrimental to the public health, welfare or safety, or to be a nuisance.
d. A final judgment of a court of competent jurisdiction has declared one or more conditions to be void or ineffective, or has enjoined or otherwise prohibited the enforcement or operation of one or more such conditions.
7. This permit is issued without a legal determination having been made upon the number, size or shape of parcels encompassed within the permit described boundaries. Should, at any time, a legal determination be made that the number, size or shape of parcels within the permit described boundaries are different than that which is legally required by this permit, this permit shall become null and void.
BE IT FURTHER RESOLVED that this Resolution shall become effective immediately upon its passage and adoption.
The above and foregoing Resolution was introduced by __________ seconded by __________, and passed and adopted at a regular meeting of the City Council of the City of Point Arena held on the 25th day of June 2024, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
RECUSE:
Mayor
ATTEST:
City Manager
1 RESOLUTION NO. - 2024
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
POINT ARENA, CALIFORNIA CERTIFYING THE MITIGATED
NEGATIVE DECLARATION FOR THE WILDFLOWER WEST
PROJECT (SCH: 2024040981); ADOPTING THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT FINDINGS; AND
ADOPTING A MITIGATION MONITORING AND REPORTING
PROGRAM
WHEREAS, 610 LLC/ Jeffrey Hansen (“Applicant”), submitted an applicant for a Coastal Development Permit, Use Permit and Lot Line Adjustment to transfer 0.145 acres (6,316.2 SF) from Parcel B (APN 027-122-21) to Parcel A (027-122-20), and a Coastal Development Permit and Use Permit to: 1) reestablish a residential use and reuse a building for a restaurant and construct a 280 SF trellis on Parcel A; 2) reestablish and rehabilitate lodging, restaurant, and residential use on Parcel B, 3) demolish existing 3,880 SF structure on Parcel B; 4) construct five (5) detached lodging units of 160 SF each on Parcel B and; 6) other associated site work as demonstrated on the project plans.
WHEREAS, the California Environmental Quality Act, Public Resources Code, Section 21000 et seq. ("CEQA"), requires that the City consider the environmental effects of the Project prior to approving any entitlements for the Project; and WHEREAS, staff prepared an MND to evaluate the impact of the proposed project on the environment pursuant to CEQA and Title 14, California Code of Regulations, Section 15074 et seq. ("CEQA Guidelines"); and
WHEREAS, the MND (State Clearinghouse No. 2024040981) was circulated for more than the required 30-day public review and comment period, beginning on April 23, 2024 and ending on June 25, 2024; and
WHEREAS, during this period, on June 25, 2024, a public hearing was held by the City Council to receive comments on the MND in accordance with the provisions of the Point Arena Zoning Ordinance; and
WHEREAS, a Mitigation and Monitoring Program, as required by CEQA, is contained in the attached Exhibit B; and
NOW, THEREFORE, BE IT RESOLVED that the City of Point Arean City Council, based on the entirety of the record before it, which includes without limitation, CEQA, Public Resources Code §21000, et seq. and the CEQA Guidelines, 14 California Code of Regulations §15000, et seq.; the Point Arena General Plan; The Point Arena Zoning Code; the Project applications; all site plans, and all reports and public testimony submitted as part of the City Council meeting of June 25, 0224; and any other evidence (within the meaning of Public Resources Code §21080(e) and §21082.2), the City Council of the City of Point Arena does hereby make the following findings and determinations:
1. For the purposes of the California Environmental Quality Act (CEQA), a Mitigated 2 Negative Declaration (MND) was prepared for the project, circulated for public review, and presented to the public and City Council prior to taking action on the Wildflower East project located at 135 and 165 Main Street in Point Arena. The conclusion of the Mitigated Negative Declaration is there are not any potentially significant impacts that cannot be mitigated.
Environmental review for the proposed project included preparation of an Initial Study and Mitigated Negative Declaration (IS/MND) pursuant to the California Environmental Quality Act (CEQA) Statue (Public Resources Code 21000 - 21189) and Guidelines (California Code of Regulations Title 14, Division 6, Chapter 3, Sections 15000 -15387).
The IS/MND was circulated from April 23, 2024 to June 25, 2024, at the State Clearinghouse. The Initial Study and Mitigated Negative Declaration included mitigation measures which have been incorporated into a Mitigation Monitoring and Reporting Plan, which is being adopted as a part of the project.
2. The following impacts have been found to be less than significant and mitigation is not required to reduce project-related impacts: Agriculture and Forestry, Energy, Hydrology and Water Quality, Greenhouse Gas Emissions, Mineral Resources, Population and Housing, Public Services, Recreation, Transportation, Tribal Cultural Resources, Utilities/Service Systems and Wildfire, Utilities and Services, and Wildfire. There is no evidence of an impact to any of the above referenced potential impact areas based on the project as proposed at this location.
3. The Initial Study identified potentially significant impacts to Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology and Soils, Hazards and Hazardous Materials, Land Use Planning and Noise which could result from the project as originally submitted. Mitigation Measures have been required to ensure potential impacts are limited to a less than significant level. These Mitigation Measures are incorporated by reference in the project ISMND, the Mitigation Monitoring and Reporting Program, the Staff Report and Resolutions.
4. Agency and public comments have been received about the project and the Mitigated Negative Declaration. These comments have been considered and the comments change the conclusions or the mitigations of the Mitigated Negative Declaration, so the MND was revised and recirculated for additional public comment.
BE IT FURTHER RESOLVED, the MND adequately describes the Project, impacts, and mitigation measures, and hereby makes the following environmental determinations regarding the Wildflower East Project considered on June 25, 2024:
1. A Mitigated Negative Declaration was prepared for this project pursuant to the provisions of CEQA.
2. Mitigation measures have been made a condition of the approval of the project.
3. A mitigation reporting and monitoring plan was prepared for this project.
NOW, THEREFORE, BE IT RESOLVED, that the Point Arean City Council adopts the MND as set forth in Exhibit A and adopts the Mitigation and Monitoring and Report Plan for the proposed Wildflower East Project (Exhibit B), subject to the mitigations included herein as outlined in the MND and the MMRP.
NOW, THEREFORE, BE IT RESOLVED, that the Point Arean City Council adopts the MND as set forth in Exhibit A and adopts the Mitigation and Monitoring Report Plan included herein as Exhibit B. This Resolution shall become effective immediately upon its passage 3 and adoption.
AYES:
NOES:
ABSENT:
ABSTAIN:
RECUSE:
Mayor
ATTEST:
City Manager
Wildflower East
Recirculated
Initial Study /
Mitigated Negative Declaration
CDP 2021-04, BLA 2021-03
Initial Circulation Date - April 22, 2024
Recirculation Date – May 16, 2024
Lead Agency
City of Point Arena
451 School Street
Point Arena, California 95468
Lead Agency Contacts
Peggy Ducey
City Manager
707-882-2122
[email protected]
Marie Jones
City Planner
707-357-6480
City of Point Arena Wildflower East
1 [email protected]
Wildflower East
CEQA Environmental Checklist and Initial Study
Project Title: Wildflower East
Lead Agency: City of Point Arena
451 School Street
Point Arena, California 95468
Contact Persons: Peggy Ducey
City Manager
707-882-2122
[email protected]
Marie Jones
City Planner
707-357-6480
[email protected]
Project Location: The project is located at 135 and 165 Main Street/State Route 1 (APN 027-122-20 and -21), Point Arena, within
Mendocino County in the incorporated city limits of Point Arena. The project is situated at Main Street’s intersection with Mill Street. The total project area is approximately
1.09 acres on two parcels (0.97 and 0.123 acres).
Project Sponsor: Jeffrey Hansen
610 Properties, LLC
PO Box 669
Point Arena, California 95468
801-955-5833
General Plan Designation: Highway Commercial
Zoning Designation: Highway Commercial
Description of Project: The applicant requests a Lot Line Adjustment to transfer
0.145 acres/6,316.2 SF from Parcel B (APN 027-122-21) to Parcel A (027-122-20), and a Coastal Development Permit to 1) reestablish and rehabilitate a restaurant and
City of Point Arena Wildflower East
2 residential use and construct a 280 SF trellis on Parcel A; 2) reestablish and rehabilitate lodging, restaurant, and residential use on Parcel B, 3) demolish existing 3,880 SF structure on Parcel B; 4) construct five (5) detached
lodging units each 160 SF in size on Parcel B and; 6) other associated site work as demonstrated on the project
plans.
See Section 2 below.
Surrounding Land Uses and
Setting:
The project is located on Main Street / SR1 near the
southern end of Point Arena, an incorporated City on the southern Mendocino County coastline. Other parcels on
the east side of Main Street in the vicinity are developed with commercial uses. Development further to the east
along Mill Street and further south on Main Street are
residential. The surrounding is composed primarily of
smaller occupied commercial properties of less than one acre.
Arena Creek is immediately adjacent to the parcel and
runs along its southern border.
Other Public Agencies Whose
Approval is Required:
Caltrans will require an Encroachment Permit for the SR1 improvements.
Mendocino County Building Department will review and
issue building permits for construction.
Have California Native American
tribes traditionally and culturally
affiliated with the project area
requested consultation pursuant
to Public Resources Code section
21080.3.1? If so, is there a plan
for consultation that includes,
for example, the determination
of significance of impacts to
tribal cultural resources,
procedures regarding
confidentiality, etc.?
Yes—notification was sent to Manchester Band of Pomo
on August 29, 2023, inviting consultation. No response
was received.
City of Point Arena Wildflower East
3 Table of Contents
1. Introduction.............................................................................................................................................. 4 a. Purpose and Intent.....................................................................................................................................5 b. Incorporation by Reference........................................................................................................................6 c. Public Review .............................................................................................................................................7
2. Setting and Project Description ................................................................................................................. 8 a. Environmental Setting................................................................................................................................8 b. Project Description.....................................................................................................................................9
3. Environmental Factors Potentially Affected..............................................................................................12
4. Determination .........................................................................................................................................12
5. Evaluation of Environmental Impacts.......................................................................................................14 a. Aesthetics.................................................................................................................................................15 b. Agricultural and Forestry Resources ........................................................................................................18 c. Air Quality ................................................................................................................................................21 d. Biological Resources.................................................................................................................................26 e. Cultural Resources....................................................................................................................................43 f. Energy ......................................................................................................................................................47 g. Geology and Soils.....................................................................................................................................51 h. Greenhouse Gas Emissions.......................................................................................................................56 i. Hazards and Hazardous Materials...........................................................................................................59 j. Hydrology and Water Quality ..................................................................................................................65 k. Land Use and Planning.............................................................................................................................71 l. Mineral Resources....................................................................................................................................80 m. Noise ........................................................................................................................................................81 n. Population and Housing...........................................................................................................................84 o. Public Services..........................................................................................................................................86 p. Recreation................................................................................................................................................88 q. Transportation .........................................................................................................................................89 r. Tribal Cultural Resources .........................................................................................................................94 s. Utilities and Service Systems....................................................................................................................96 t. Wildfire.....................................................................................................................................................99 City of Point Arena Wildflower East
4 u. Mandatory Findings of Significance.......................................................................................................101
1. Introduction
This Initial Study/Mitigated Negative Declaration (IS/MND) has been prepared in accordance with the procedural and substantive requirements of the California Environmental Quality Act (CEQA). The analysis evaluates environmental impacts from the proposed Wildflower East project is described below.
Project Description
The proposed project requires the approval of a Coastal Development Permit, Boundary Line Adjustment, and Use Permit, and includes the following components:
Boundary Line Adjustment
Boundary Line Adjustment to reconfigure boundary lines between two (2) adjacent lots in Point Arena. Parcel A (APN 027-122-20) would increase from 5,393± square feet to 10,759± square feet, and Parcel B (APN 027-122-21) would decrease from 42,267± square feet to 40,685± square feet.
Development on Proposed Parcel A (APN 027-122-20)
• Reestablish restaurant use in existing structure
Interior and exterior remodel of existing 461± square foot structure (historically used as restaurant and retail space) to 826 SF restaurant/market space.
Construction of a 280± square foot trellis and courtyard in front of the existing structure for outdoor restaurant seating.
• Reestablish residential use in existing structure
Interior and exterior remodel of existing 1,224± square foot structure (historically a residence) to a duplex with one unit on the first floor and one unit on the second floor. • Site Improvements
Additional site improvements on proposed Parcel A include:
New landscaping to the east and west of the residential structure, between the two buildings, and between the proposed parking lot and the restaurant. A new short retaining wall is proposed between the buildings and between the restaurant and the parking lot.
New site parking lot with 14 spaces and shared drive isle with Parcel B. New paved walkways from parking areas to the existing buildings.
Both existing structures are served by existing water, sewer, and electrical connections.
Access is provided by existing encroachments on Main Street (Hwy 1) and Mill Street, and requires access easements over proposed Parcel B.
Development on Proposed Parcel B (APN 027-122-21)
• Reestablish lodging use and establish restaurant and residential use in existing structure Interior and exterior remodel of existing 4,160± square foot structure (historically used City of Point Arena Wildflower East
5 for lodging) for a 20-unit lodging use, two residential units, and 1,880± square foot restaurant space.
Construct 28 off-street parking spaces for the uses in this structure (24 standard and four ADA spaces).
• Demolish existing structure (work completed without permits) Demolish 3,880± square foot structure (historically used for lodging). • Construct five (5) detached lodging units
In a previously vacant area of proposed Parcel B, construct five (5) detached 160± square foot lodging units. Five (5) off-street parking spaces provided on-site (four (4) required). • Site Improvements
Additional improvements on proposed Parcel B include:
o Landscaped areas around the proposed lodging units and restaurant. o A 140± foot long retaining wall is proposed along the east side of development to separate the project from natural resources along Arena Creek. o A 40,000-gallon subterranean water tank for fire suppression is proposed with a 32-foot-tall gazebo placed on top.
o A 40-foot-tall windmill is proposed adjacent to the five (5) new lodging units,
o A 27-foot-tall, elevated water tank is proposed adjacent to Main Street. o A trash collection area is proposed between the lodging uses. o A total of 19 parking spaces are proposed on this parcel to serve the proposed uses with an additional 9 parking spaces located on parcel A which also serve these uses, which will require access and maintenance easements. Areas proposed for parking were either previously paved for parking or were within the footprint of the demolished building.
o The existing structure on proposed Parcel B is served by existing water, sewer, and electric service. The proposed five (5) new lodging units will connect to water and sewer service from Main Street and use existing electrical service on site.
o Access is provided by existing encroachments on Main Street (Hwy 1) and Mill Street, and requires access easements over proposed Parcel A.
Hereafter referred to as the “Project”.
a. PURPOSE AND INTENT
CEQA requires that public agencies document and consider the potential environmental effects of the agency’s actions that meet CEQA’s definition of a “project.” Briefly summarized, a “project” is an action that has the potential to result in direct or indirect physical changes in the environment. A project includes the agency’s direct activities as well as activities that involve public agency approvals or funding. Guidelines for an agency’s implementation of CEQA are found in the CEQA Guidelines (Title 14, Chapter 3 of the California Code of Regulations).
Provided that a project is not exempt from CEQA, the first step in the agency’s consideration of City of Point Arena Wildflower East
6 its potential environmental effects is the preparation of an Initial Study. The purpose of an Initial Study is to determine whether the project would involve “significant” environmental effects, as defined by CEQA, and to describe feasible mitigation measures that would avoid significant effects or reduce them to a level that is less than significant. If the Initial Study does not identify significant effects, then the agency prepares a Negative Declaration (ND). If the Initial Study notes significant effects but also identifies mitigation measures that would reduce these significant effects to a level that is less than significant, then the agency prepares a Mitigated Negative Declaration (MND). If a project would involve significant effects that cannot be readily mitigated, then the agency must prepare an Environmental Impact Report (EIR). The agency may also decide to proceed directly with the preparation of an EIR without an Initial Study.
The proposed project is a “project” as defined by CEQA and is not exempt from CEQA consideration. The City has determined that the Project may potentially have significant environmental effects and therefore would require preparation of an IS/MND. This IS/MND describes the proposed project and its environmental setting, discusses the potential environmental effects of the project, and identifies feasible mitigation measures that would eliminate any potentially significant environmental effects of the project or reduce them to a level that would be less than significant.
This IS/MND is a public information document that describes the proposed project, existing environmental setting at the project site, and potential environmental impacts of construction and operation of the proposed project. It is intended to inform the public and decision-makers of the proposed project’s potential environmental impacts, identify/require mitigation measures to reduce environmental effects to a less than significant impact, and document the lead agency’s compliance with CEQA and the State CEQA Guidelines.
This IS/MND concludes that the project would potentially have a significant environmental effect unless mitigation measures are required as part of the CEQA process. As a result, the District has prepared an MND and has issued a Notice of Intent to adopt the MND for the project. The time available for public comment on the Initial Study and MND is shown on the Notice of Intent.
b. INCORPORATION BY REFERENCE
In accordance with Section 15150 of the State CEQA Guidelines to reduce the size of the report, the following documents are hereby incorporated by reference into this Initial Study and are available for public review at the City of Point Arena. • City of Point Arena General Plan
• City of Point Arena Municipal Code—Title 17: Subdivisions • City of Point Arena Municipal Code—Title 18: Zoning
• Project Plans
City of Point Arena Wildflower East
7 • Rhiannon Korhummel, WRA, Environmentally Sensitive Habitat Area (ESGA) Survey 135 Main Street City of Point Arena, 2023
c. PUBLIC REVIEW
In accordance with CEQA and the state CEQA Guidelines, the IS/MND prepared for the Wildflower East project will be circulated for a 30-day public review period and distributed to interested or involved public agencies, organizations, and private individuals for review. In addition, the IS/MND has been made available for general public review by appointment at the following location:
City of Point Arena
451 School Street
Point Arena, California
Hours: Monday - Thursday
9:00 a.m. to 5:00 p.m.
During the public review period, the public will have an opportunity to provide written comments on the information contained within this IS/MND. The City will use the final IS/MND and all comments and correspondence received within the public comment period for all environmental decisions related to the proposed Project.
In reviewing the IS/MND and as articulated in Section 15204(a) of the CEQA Guidelines, affected public agencies and interested members of the public should focus on the sufficiency of the document in identifying and analyzing potential impacts on the environment from the proposed Project, and ways in which the significant effects of the Project are proposed to be avoided or mitigated. Pursuant to Section 15204(b) of the CEQA Guidelines, such public agencies and persons should focus on the proposed finding that the Project will not have a significant effect on the environment. If public agencies or persons believe that the proposed Project may have a significant effect, they should:
• Identify the specific effect;
• Explain why they believe the effect would occur;
• Explain why they believe the effect would be significant; and • Per Section 105204(c), reviewers should explain the basis for their comments, and should submit data or references offering facts, reasonable assumptions based on facts, or expert opinion supported by facts in support of the comments.
Comments on the IS/MND should be submitted in writing to:
Marie Jones
City Planner
PO Box 67
Point Arena, California 95468
[email protected]
City of Point Arena Wildflower East
8 2. Setting and Project Description
This section provides a characterization of the Wildflower East project including the environmental setting and project location.
a. ENVIRONMENTAL SETTING
The City of Point Arena is a small City situated along the coast in southwest Mendocino County.
Point Arena’s history is linked to the lumber industry of the late 1800s. Arena Cove was a safe location for ships to anchor, and as a result, a wharf was built to serve ships transporting lumber from the Mendocino coast to San Francisco. The wharf quickly became a shipping location for the lumber industry and consequently the town grew. When Point Arena was incorporated in 1908, its layout and size was similar to today. The mountainous terrain of coastal northern California makes Point Arena relatively isolated from the rest of Mendocino County, accessible primarily by coastal State Route 1 (SR1). Although the town has its own post office, schools, and medical services, many services for residents are located in other communities in Mendocino County, such as Mendocino (34 miles north), Gualala (15 miles south), Fort Bragg (45 miles north), and Ukiah (50 miles northeast). Point Arena is the smallest of four incorporated areas of Mendocino County: the others being Ukiah, Willits, and Fort Bragg. Point Arena is also located immediately to the west of the Manchester/Point Arena Rancheria, a community of the Pomo Indian Tribe.
Point Arena is surrounded by coastal prairies and bluffs, riparian hillsides, and working farmlands. Downtown Point Arena lies within a narrow ravine drained by Point Arena Creek at the south end of the town. From the south to the north, Main Street/SR1 ascends a fairly steep slope approximately 115 feet in elevation. This steep topography creates a clear view of the entire downtown from both the top and bottom of Main Street.
The Project area contains two mapped aquatic features, including perennial stream (Arena Creek) and riparian area. Arena Creek is also mapped on the Point Arena USGS 7.5-minute quad map (USGS 2015).
• Arena Creek runs across the southern end of Point Arena, directly adjacent to the subject parcel. Arena Creek continues along Port Road to Arena Cove, at the base of a north-facing slope.
• The creek is bordered on both sides with riparian vegetation, and inaccessible from the road. The Point Arena General Plan and Zoning Ordinance define a riparian buffer area of a minimum of 100 feet to “protect the resources of the particular habitat area from significant degradation caused by proposed development.” • Arena Creek is known habitat for the Point Arena Mountain Beaver (PAMB), which is a federally protected endangered species. The Point Arena General Plan and Zoning Ordinance establish a 500-foot buffer area along each side of the creek for the preservation of the PAMB habitat by minimizing and mitigating disturbances to the City of Point Arena Wildflower East
9 PAMB. Any noise-generating or habitat-modifying projects within the buffer area require an environmental survey, and if evidence of beavers is found within the project area, then additional project mitigation or the development of a habitat conservation plan shall be required. The US Fish and Wildlife Service sent a no-take determination on this property based on negative survey results for PAMB during a site survey on May 10, 2022 by Service staff.
• The US Fish and Wildlife Service also determined that the site is suitable habitat for the California Red Legged Frog (CRLF) and requires mitigation measures to reduce impacts to the CRLF.
The topographic change within Point Arena creates views toward the coastal bluffs, the ocean, and the inland forests from the downtown. The Point Arena General Plan identifies five viewsheds and scenic corridors that shall be protected from “inappropriate development and unavoidable alterations.” These viewsheds are to the south from School Street, along Windy Hollow Road, along and from Riverside Drive, along Port Road, and at Arena Cove.
The Project site consists of two parcels in the geographic south of the City, with frontage on Main Street/SR1 and on Mill Street. This portion of the City is characterized by moderate density residential development to the east and immediate south, and commercial development elsewhere along Main Street. The site is at an elevation of approximately 110 feet above sea level with an approximate five percent slope from the front to the back of the property (Arena Creek).
The Project site consists of two parcels, or 0.97 and 0.123 acres respectively, for a total of 1.093 acres. The parcels are located on the southeast side of Main Street’s intersection with Mill Street/SR1 (APN 027-122-20 and -21). The parcels were developed in the 1960s and used as a lodging establishment for many years. More recently the buildings have been unoccupied and dilapidated. The developed portion of the Project site includes dilapidated lodging and office buildings and associated features such as a parking lot, sidewalks, and lower-level storage garages. The undeveloped portion of the site was disturbed through past use with residential and commercial structures, which have been demolished.
b. PROJECT DESCRIPTION
Project Description
The proposed project requires the approval of a Coastal Development Permit, Boundary Line Adjustment, and Use Permit, and includes the following components:
Boundary Line Adjustment
Boundary Line Adjustment to reconfigure boundary lines between two (2) adjacent lots in Point Arena. Parcel A (APN 027-122-20) would increase from 5,393± square feet to 10,759± square feet, and Parcel B (APN 027-122-21) would decrease from 42,267± square feet to 40,685± square feet.
City of Point Arena Wildflower East
10 Development on Proposed Parcel A (APN 027-122-20)
• Reestablish restaurant use in existing structure
Interior and exterior remodel of existing 461± square foot structure (historically used as restaurant and retail space) to 826 SF restaurant/market space.
Construction of a 280± square foot trellis and courtyard in front of the existing structure for outdoor restaurant seating.
• Reestablish residential use in existing structure
Interior and exterior remodel of existing 1,224± square foot structure (historically a residence) to a duplex with one unit on the first floor and one unit on the second floor. • Site Improvements
Additional site improvements on proposed Parcel A include:
New landscaping to the east and west of the residential structure, between the two buildings, and between the proposed parking lot and the restaurant. A new short retaining wall is proposed between the buildings and between the restaurant and the parking lot.
New site parking lot with 14 spaces and shared drive isle with Parcel B. New paved walkways from parking areas to the existing buildings.
Both existing structures are served by existing water, sewer, and electrical connections.
Access is provided by existing encroachments on Main Street (Hwy 1) and Mill Street, and requires access easements over proposed Parcel B.
Development on Proposed Parcel B (APN 027-122-21)
• Reestablish lodging use and establish restaurant and residential use in existing structure Interior and exterior remodel of existing 4,160± square foot structure (historically used for lodging) for a 20-unit lodging use, two residential units, and 1,880± square foot restaurant space.
Construct 28 off-street parking spaces for the uses in this structure (24 standard and four ADA spaces).
• Demolish existing structure (work completed without permits) Demolish 3,880± square foot structure (historically used for lodging). • Construct five (5) detached lodging units
In a previously vacant area of proposed Parcel B, construct five (5) detached 160± square foot lodging units. Five (5) off-street parking spaces provided on-site (four (4) required). • Site Improvements
Additional improvements on proposed Parcel B include:
o Landscaped areas around the proposed lodging units and restaurant. o A 140± foot long retaining wall is proposed along the east side of development to separate the project from natural resources along Arena Creek. o A 40,000-gallon subterranean water tank for fire suppression is proposed with a 32-foot-tall gazebo placed on top.
o A 40-foot-tall windmill is proposed adjacent to the five (5) new lodging City of Point Arena Wildflower East
11 units,
o A 27-foot-tall, elevated water tank is proposed adjacent to Main Street. o A trash collection area is proposed between the lodging uses. o A total of 19 parking spaces are proposed on this parcel to serve the proposed uses with an additional 9 parking spaces located on parcel A which also serve these uses, which will require access and maintenance easements. Areas proposed for parking were either previously paved for parking or were within the footprint of the demolished building.
o The existing structure on proposed Parcel B is served by existing water, sewer, and electric service. The proposed five (5) new lodging units will connect to water and sewer service from Main Street and use existing electrical service on site.
o Access is provided by existing encroachments on Main Street (Hwy 1) and Mill Street, and requires access easements over proposed Parcel A.
City of Point Arena Wildflower East
12 3. Environmental Factors Potentially Affected
The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a “Potentially Significant Impact” as indicated by the checklist on the following pages.
Aesthetics Agriculture and Forestry
Resources Air Quality
Biological Resources Cultural Resources Energy
Geology and Soils Greenhouse Gas
Emissions Hazards and Hazardous Materials
Hydrology and Water
Quality Land Use and Planning Mineral Resources
Noise Population and Housing Public Services
Recreation Transportation Tribal Cultural
Resources
Utilities and Service
Systems Wildfire Mandatory Findings of Significance
4. Determination
On the basis of this initial evaluation:
I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.
I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.
I find that the proposed project MAY have a “potentially significant impact” or “potentially significant unless mitigated” impact on the environment, but at least on effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze on the effects that remain to be addressed.
City of Point Arena Wildflower East
13 I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required.
May 10, 2024
Signature Date
City of Point Arena Wildflower East
14 5. Evaluation of Environmental Impacts
This section provides an evaluation of the potential environmental impacts of the proposed Wildflower East project, as well as the CEQA Mandatory Findings of Significance. A discussion of cumulative impacts is included at the end of this chapter.
The environmental analysis in this section is patterned after the Initial Study Checklist recommended by the State CEQA Guidelines. This checklist has been updated with the revisions of the January 1, 2023, State CEQA Guidelines.
For the evaluation of potential impacts, the questions in the Initial Study Checklist are stated and an answer is provided according to the analysis undertaken as part of the Initial Study. The analysis considers the long-term, direct, indirect, and cumulative impacts of the development.
To each question, there are four possible responses:
• No Impact. The development will not have any measurable impact on the environment. • Less Than Significant Impact. The development will have the potential for impacting the environment, although this impact will be below established thresholds that are considered to be significant.
• Potentially Significant Impact Unless Mitigation Incorporated. The development will have the potential to generate impacts which may be considered as a significant effect on the environment, although mitigation measures or changes to the development’s physical or operational characteristics can reduce these impacts to levels that are less than significant.
• Potentially Significant Impact. The development will have impacts which are considered significant, and additional analysis is required to identify mitigation measures that could reduce these impacts to less than significant levels.
The setting discussion under each resource section in this chapter is followed by a discussion of impacts and applicable mitigation measures.
City of Point Arena Wildflower East
15 a. AESTHETICS
Would the project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Have a substantial adverse effect on
a scenic vista?
b) Substantially damage scenic
resources, including, but not limited
to trees, rock outcroppings, and
historic buildings within a state
scenic highway?
c) In nonurbanized areas, substantially
degrade the existing visual character
or quality of public views of the site
and its surroundings? (Public views
are those that are experienced from
publicly accessible vantage point). If
the project is in an urbanized area,
would the project conflict with
applicable zoning and other
regulations governing scenic quality?
d) Create a new source of substantial
light or glare which would adversely
affect day or nighttime views in the
area?
Existing Aesthetics Setting
Scenic vistas are expansive views of highly valued landscapes from publicly accessible viewpoints. Scenic vistas include views of natural features such as topography, water courses, outcrops, and natural vegetation, as well as man-made scenic structures.
There are several Point Arena General Plan policies that address the protection of aesthetic resources, including the Scenic Corridors map that depicts view corridors and their orientations.
View corridors are mapped from School Street facing south toward Arena Creek, along Port Road facing west toward the ocean, and along Windy Hollow Road facing east toward the ridge.
The General Plan’s policies require new development be sited and designed to protect public views, viewsheds, and view corridors, with emphasis on the areas on the Scenic Corridors map.
City of Point Arena Wildflower East
16 Aesthetics Impact Discussion
a) Would the project have a substantial adverse effect on a scenic vista? Less than significant Impact
The project is located on the east side of Main Street/SR1 where existing development and mature vegetation is the backdrop to views from Main Street. The creek and riparian vegetation are located at the southern boundary of the Project; however, the site’s existing development currently blocks views to these natural features, and the Project would not increase the existing view obstructions. The project is not within a mapped viewshed area, per the General Plan’s Scenic Corridors map. There is no mapped scenic vista in the view corridor of the project area.
b) Would the project substantially damage scenic resources, including, but not limited to trees, rock outcroppings, and historic buildings within a state scenic highway? Less than Significant Impact
Although eligible for listing, SR1 (Main Street) is not currently listed as a state scenic highway.
Due to the previous development, the site lacks scenic trees or rock outcroppings that could be impacted by the Project.
City of Point Arena Wildflower East
17 c) In nonurbanized areas, would the project substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality?
Less than Significant Impact
For incorporated cities, the 2023 CEQA Statute and Guidelines defines an “urbanized area” in Section 21071 as having a population of at least 100,000 persons, or being contiguous with another incorporated city which, together, have combined populations of at least 100,000 persons. For the purposes of CEQA, the City of Point Arena is a “nonurbanized area.” As such, only the thresholds applicable to nonurbanized areas are applicable for this review.
The only public views proximate to the proposed project are located along Main Street and Mill Street (the public rights-of-way).
The existing public views from Main Street look easterly or southerly at the property and are backdropped by existing residential development and vegetation along Arena Creek. Existing development and trees on the Project parcels block views to the hills and creek.
View to the east from Main Street
View to the South from Mill Street
City of Point Arena Wildflower East
18 The development project would repair and reconstruct these existing structures in the public viewshed from both the Main Street and Mill Street public vantage points. As these public views are already characterized by existing development on both the Project parcel and adjacent parcels the proposed project would have a less than significant impact. d) Would the project create a new source of substantial light or glare which would adversely affect day or nighttime views in the area?
Less than Significant Impact with Mitigation
Past uses on the Project site have not operated for several years. Ambient lighting levels are influenced by the current pattern of development and headlights from vehicles. The Project proposes to reestablish commercial uses and develop five new lodging units that could create new sources of light or glare that could adversely affect day or nighttime views.
The proposed Project would be consistent with the current development patterns in the area and past uses on site, so it is unlikely that the Project would create a new source of light or glare that would affect the current ambient lighting levels. However, the Project application does not include specifications for lighting. AES-1 will ensure impacts remain less than significant by requiring a review of the proposed lighting prior to issuance of a building permit.
Mitigation Measures
AES-1: Prior to issuance of a building permit for this Project, the applicant shall submit an exterior lighting plan showing the location of all exterior lights and the manufacturer and type of lighting fixtures proposed. Lights and light fixtures shall be downcast and shielded to prevent offsite light trespass. The exterior lighting plan shall be reviewed and approved by the City in conjunction with building permit review. b. AGRICULTURAL AND FORESTRY RESOURCES
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Convert Prime Farmland, Unique
Farmland, or Farmland of Statewide
Importance (Farmland), as shown on
the maps prepared pursuant to the
Farmland Mapping and Monitoring
Program of the California Resources
Agency, to non-agricultural use?
City of Point Arena Wildflower East
19 b) Conflict with existing zoning for
agricultural use, or a Williamson Act
contract?
c) Conflict with existing zoning for, or
cause rezoning of, forest land (as
defined in Public Resources Code
Section 12220(g)), timberland (as
defined by Public Resources Code
Section 4526), or timberland zoned
Timberland Production (as defined
by Government Code Section
51104(g))?
d) Result in the loss of forest land or
conversion of forest land to nonforest use?
e) Involve other changes in the existing
environment which, due to their
location or nature, could result in
conversion of Farmland, to nonagricultural use or conversion of forest land to non-forest use?
Existing Agricultural and Forestry Setting
• The California Department of Conservation, Farmland Mapping and Monitoring Program (FMMP) classifies land into Important Farmland Categories, which are based on a combination of technical soil ratings and current land use. Under CEQA, the categories of Prime Farmland, Farmland of Statewide Importance, Unique Farmland, Farmland of Local Importance, and Grazing Land constitute agricultural land. Based on the most recent available FMMP data, the majority of Point Arena is classified as Grazing Land, with the downtown core and Hay Industrial Park classified as Urban and Built-up Land. The Project site and adjacent areas are classified as Urban Built-up Land.
• There are no Williamson Act properties within the City. • There are no lands within the City designated or zoned for timberland production or other forestry-related uses.
Agricultural and Forestry Resources Impact Discussion
a) Would the project convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? No Impact
City of Point Arena Wildflower East
20 See response below.
b) Would the project conflict with existing zoning for agricultural use, or a Williamson Act contract?
No Impact
The Project site is not designated under the FMMP as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance and therefore will not result in the conversion of farmland to non-agricultural use. The site’s zoning and General Plan classification do not allow agricultural land uses by-right or with a conditional use permit. The proposed project would establish commercial and residential uses consistent with adjacent and nearby commercial and residential development. As a result, there are no impacts related to farmland or Williamson Act lands, as the Project would not convert Prime, Unique, or Important Farmland to nonagricultural use, nor would the Project conflict with any Williamson Act contract. c) Would the project conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))?
No Impact. See response below.
d) Would the project result in the loss of forest land or conversion of forest land to non-forest use?
No Impact
The Project is not proposed on lands zoned or designated as timberland and is not forested.
Surrounding properties are also not zoned timberland and are not forested. Therefore, the project would have no impact on timberland or forest lands. e) Would the project involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use?
No Impact. See discussion related to 5.2(a) and 5.2(b) above.
Mitigation Measures
None required.
City of Point Arena Wildflower East
21 c. AIR QUALITY
Except as provided in Public Resources
Code Section 21099, would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Conflict with or obstruct
implementation of the applicable air
quality plan?
b) Result in a cumulatively considerable
net increase of any criteria pollutant for
which the Project region is nonattainment under an applicable federal or state ambient air quality standard?
c) Expose sensitive receptors to
substantial pollutant concentrations?
d) Result in other emissions (such as
those leading to odors) adversely
affecting a substantial number of
people?
Existing Air Quality Setting
The City of Point Arena is located within the North Coast Air Basin, which includes the counties of Del Norte, Trinity, Humboldt, Mendocino and parts of Sonoma. Air quality within the North Coast Air Basin is influenced by natural geographical and meteorological conditions as well as human activities such as construction and development, operation of vehicles, industry and manufacturing, and other anthropogenic emission sources. The Federal Clean Air Act and the California Clean Air Act establish national and state ambient air quality standards. The Mendocino County Air Quality Management District (MCAQMD) is the agency responsible for enforcing all State, Federal and Local air quality laws and regulations in Mendocino County, including the City of Point Arena.
The District is in attainment (meaning compliant with current standards) for all Federal criteria air pollutants, and most State standards with the exception of PM10. Primary sources of PM10 include wood combustion emissions, fugitive dust from construction, automobile emissions, and industry. The MCAQMD has an adopted Particulate Matter (PM) Attainment Plan which includes recommended control measures to reduce future PM levels including alternatives to the use of wood burning stoves/fireplaces, the use of dust control practices during construction operations, and improvement of bicycle facilities to reduce vehicle trips. In addition to criteria City of Point Arena Wildflower East
22 air pollutants, the District also identifies areas likely to contain Naturally Occurring Asbestos (NOA) and sets forth regulations for evaluating the presence of NOA for individual projects.
Air quality emissions of carbon monoxide (CO), ozone precursors (ROG and NOx), and particulate matter (PM10 and PM2.5) from construction and operation are evaluated relative to the adopted air quality thresholds. The MCAQMD utilizes adopted Bay Area Air Quality Management District (BAAQMD) thresholds for construction-related emissions. Operational emission thresholds have been adopted to align with District rules and regulations.
The City of Point Arena’s General Plan sets forth policies to maintain and improve air quality in the City. Section 4 of the Health and Safety Element includes policies to ensure development is consistent with the requirements of the MCAQMD, and to preserve Point Arena’s high air quality.
Air Quality Impact Discussion
a) Would the project conflict with or obstruct implementation of the applicable air quality plan?
Less than Significant Impact with Mitigation
As previously stated, the MCAQMD is in attainment for all Federal and State criteria air pollutants with the exception of PM10. MCAQMD adopted the Particulate Matter Attainment Plan in January 2005, which includes recommended control measures for PM. MCAQMD Regulation 4.1-400 prohibits the installation of wood burning fireplaces, outdoor boilers, and other wood burning appliances in new developments. Additionally, the Plan includes measures to control particulate matter emissions associated with vehicular activities.
Mitigation Measures AQ-1 and AQ-2, consistent with standard conditions of approval, require the project to comply with applicable MCAQMD regulations including the incorporation of dust control measures during construction and the prohibition of woodburning appliances.
Therefore, the Project will have less than significant impacts with mitigation due to a conflict with the regional air quality plan.
b) Would the project result in a cumulatively considerable net increase of any criteria pollutant for which the Project region is non-attainment under an applicable federal or state ambient air quality standard?
Less than Significant Impact
Air quality emissions associated with the Project would result from short-term construction activities and ongoing operation.
City of Point Arena Wildflower East
23 Construction Activities
As analyzed below, the construction-related impacts associated with the proposed development would fall well below the (BAAQMD) threshold for a significant impact on air quality.
The Bay Area Air Quality Management District (BAAQMD) establishes the thresholds for significance for construction-related air quality impacts in Mendocino County and has adopted CEQA significance thresholds and screening criteria for criteria air pollutants. If a project falls below the screening criteria, then the project would not generate criteria air pollutants and/or precursors that exceed the thresholds of significance, and would therefore result in a less than significant cumulative impact to air quality from criteria air pollutant and precursor emissions.
BAAQMD screening criteria includes land use type categories for “apartments,” “hotels,” and “restaurants,” which are the most consistent categories for this Project. The table below compares the BAAQMD screening criteria for construction-related impacts to the proposed development on site.
Land Use Type
BAAQMD Construction-Related
Impact Significance Threshold Proposed Project
Restaurant 452,000 SF 2,330 SF
Hotel 312 rooms 25 rooms
Apartments 416 units 4 units
The construction-related impacts associated with the proposed development are substantially below the above threshold and therefore, construction related increases of any criteria pollutant are less than significant.
Operation
The Project would result in stationary and mobile operation emissions. Although there would be no new stationary “point sources” created (large emitters such as manufacturing plants), the Project will result in emissions from the use of propane gas, consumer products such as solvents, cleaners, and paints, and landscaping maintenance equipment. Most of the operational emissions would result from vehicles traveling to and from the Project site by residents, visitors, delivery vehicles, etc.
The MCAQMD has an adopted Particulate Matter (PM) Attainment Plan which includes recommended control measures to reduce future PM levels associated with Project operation, including alternatives to the use of wood burning stoves/fireplaces, the use of dust control practices during construction operations, and requirements for bicycle facilities to reduce vehicle trips.
City of Point Arena Wildflower East
24 The Project is not expected to result in substantial air quality emissions. Lighting, electricity, water, wastewater, and energy-related demands would be expected to be minimal as new buildings are subject to Title 24 requirements under the latest building code.
BAAQMD also provides screening criteria (revised 2023) establishing baseline significance thresholds for the operation of the proposed land uses. The table below compares the BAAQMD screening criteria for operation-related impacts to the proposed development on site.
Land Use Type
BAAQMD Operation-Related
Impact Significance Threshold Proposed Project
Restaurant 452,000 SF 2,330 SF
Hotel 312 rooms 25 rooms
Apartments 416 units 4 units
Again, air quality impacts from the operation of the proposed development are again well below the criteria and therefore the Project air quality impact would be less than significant. c) Would the project expose sensitive receptors to substantial pollutant concentrations? Less than Significant with Mitigation
The California Air Resources Board (CARB) defines sensitive receptors as children, elderly, individuals with asthma, and other populations who are at a heightened risk of negative health effects resulting from exposure to air pollutants. Sensitive receptor locations may include hospitals, schools, day care centers, residential areas and recreation facilities. Sensitive receptors within close proximity of the Project site which may be exposed to health risks from construction exhaust emissions and dust are the RCMS Medical Center (134 feet north of the site) and Arena Union Elementary School (1,544 feet north of the site).
Construction
Construction associated Project would result in the emission of exhaust from vehicles and heavy-duty equipment as well as the generation of fugitive dust from grading and ground disturbing activities. To ensure that fugitive dust emissions are reduced to levels below significance, Mitigation Measure AQ-1 shall be implemented. With implementation of AQ-1, impacts to sensitive receptors during construction will be reduced to less than significant with mitigation.
Operation
At operation, the use of the site for lodging, restaurant, and residential uses will not generate air quality emissions that affect sensitive receptors in the vicinity of the site. Proposed use of the site is consistent with the General Plan and the pattern of existing development along Main Street. Potential impacts to sensitive receptors at operation of the Project will be less than significant.
City of Point Arena Wildflower East
25 Air Quality Land Use Compatibility
The proposed Project has the potential to expose new residents, visitors, quests and employees onsite to emissions associated with traffic along SR1. However, impacts are expected to be less than significant.
d) Would the project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
Less than Significant Impact
Occasional localized odors during Project construction from construction equipment, paving and the application of architectural coatings may occur during development. Any odors generated during construction would be temporary and not likely noticeable beyond the immediate construction zone. Project Operation will not create objectionable odors affecting a substantial number of people. Therefore, the Project will have less than significant impacts to air quality due to objectionable odors.
Mitigation Measures
AQ-1: The Project comply with the following mitigation measures set forth by the Mendocino County Air Quality Management District to control fugitive dust generated during construction activities:
1. All visibly dry disturbed soil and road surfaces shall be watered to minimize fugitive dust emissions.
2. Earth or other material tracked onto neighboring paved roads shall be removed promptly.
3. Approved chemical soil stabilizers shall be applied to exposed earth surfaces in inactive construction areas and exposed stockpiles (i.e., sand, gravel, dirt).
4. Dust generating activities shall be limited during periods of high winds (over 15 mph).
5. Access of unauthorized vehicles onto the construction site during non-working hours shall be prevented.
6. A daily log shall be kept of fugitive dust control activities.
AQ-2: The Project shall comply with Regulation 4, Rule 4.1-400 of the MCAQMD related to prohibitions on woodburning, including the following:
1. 4.1-400(a) No person shall install an open wood burning fireplace in any new residential, commercial, or public building or accessory building, or as part of a renovation of any residential, commercial, or public building or accessory building.
2. 4.1-400(b) No person shall install a wood-fired outdoor boiler to provide heat for any residential, commercial, or public building or accessory building.
3. 4.1-400(c) No person shall install wood burning appliances in any new, remodeled or renovated multi- family residence, commercial or public building or accessory building, except as a replacement for an existing wood burning appliance.
City of Point Arena Wildflower East
26 4. 4.1-400(d) No person shall install wood burning appliances in any new or remodeled residential dwelling of three units or less, or any accessory building, that is not an approved device as defined in Rule 4.1-140(a3).
5. 4.1-400(f) No person shall install any wood burning appliances in any residential dwelling or accessory building that is included as part of a major subdivision, which filed a tentative map after the effective date of this regulation. d. BIOLOGICAL RESOURCES
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Have a substantial adverse effect,
either directly or through habitat
modifications, on any species identified
as a candidate, sensitive, or special
status species in local or regional plans,
policies, or regulations, or by the
California Department of Fish and
Wildlife or U.S. Fish and Wildlife Service?
b) Have a substantial adverse effect on
any riparian habitat or other sensitive
natural community identified in local or
regional plans, policies, regulations or by
the California Department of Fish and
Wildlife or U.S. Fish and Wildlife Service?
c) Have a substantial adverse effect on
state or federally protected wetlands
(including, but not limited to, marsh,
vernal pool, coastal, etc.) through direct
removal, filling, hydrological
interruption, or other means?
d) Interfere substantially with the
movement of any native resident or
migratory fish or wildlife species or with
established native resident or migratory
wildlife corridors, or impede the use of
native wildlife nursery sites?
e) Conflict with any local policies or
ordinances protecting biological
City of Point Arena Wildflower East
27 resources, such as a tree preservation
policy or ordinance?
f) Conflict with the provisions of an
adopted Habitat Conservation Plan,
Natural Community Conservation Plan,
or other approved local, regional, or
state habitat conservation plan?
Existing Biological Resources Setting
Biological resources are protected by statute including the Federal Endangered Species Act (FESA), the California Endangered Species Act (CESA), and the Clean Water Act (CWA). The Migratory Bird Treaty Act (MBTA) affords protection to migratory bird species including birds of prey. These regulations provide the legal protection for identified plant and animal species of concern and their habitat. The California Department of Fish and Wildlife (CDFW) California Natural Diversity Database (CNDDB) provides an inventory of the status and location of rare plant and animal species in California.
The City’s General Plan includes policies within the Open Space and Conservation Element aimed at protecting natural resources. These policies require the protection of environmentally sensitive habitat areas (ESHAs) and aim to enhance wildlife habitats. Open Space and Conservation Element Policy 14 establishes a 500-foot riparian setback area from the centerline of Arena Creek for the protection of Point Arena Mountain Beaver (PAMB). Within this setback area, the Zoning Ordinance requires surveys by a qualified biologist for signs of PAMB, and mitigation measures to be implemented limiting development activities and noise-generating construction activities proximate to identified habitat during the December 15 through June 15 breeding season.
In addition to PAMB, ESHAs are protected in the California Coastal Zone by implementation of City Zoning Code Section 18.25.220. Development in or adjacent to ESHA are required to meet the standards outlined in that section, notably a requirement that most development be prohibited within 100 feet of ESHA. ESHA buffers may be reduced to 50 feet after consultation with California Department of Fish and Wildlife (CDFW) and concurrence that 100 feet is not necessary to protect the resource or habitat.
The United States Fish and Wildlife Service (USFWS) identifies geographic areas that contain features essential for the conservation of threatened or endangered species. A search of the USFWS critical habitat map indicates critical habitat for California red-legged frog.
The Project parcel was developed in the 1960s as a lodging establishment; the structures remain and have become dilapidated. The developed portion includes the dilapidated lodging and office buildings and associated features such as a parking lot, sidewalks, and lower-level storage garages. The undeveloped land is disturbed through past land use which included residential/commercial structures, which have since been demolished.
City of Point Arena Wildflower East
28 Biological Resources Impact Discussion
a) Would the project have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
Less than Significant Impact with Mitigation
Rhiannon Korhummel, Senior Plant Biologist with WRA, surveyed the Project site on April 23, 2022 and on June 5, 2022 to evaluate the potential presence of special-status botanical and biological species, to assess the presence of suitable habitat for special-status species, and to determine and map the presence of critical habitat, essential fish habitat, and wildlife corridors (Environmentally Sensitive Habitat Area Survey, November 2022). Per the report, most of the Project site is either classified as developed lands or non-native annual grassland, characterized by Sweet Vernal Grass Meadow Semi-Natural Alliance. The areas identified as non-native grassland consists of less than 10 percent relative cover of natural species. While no individual special-status wildlife or plant species were observed during any site visit, the survey and a subsequent memo which addresses fish habitat conclude that the following special-status resources and/or their habitats as either present at the Project site, likely to be present, or assumed to be present:
Resource Resource Type Status/Designation Survey Notes
Red Alder Forest Sensitive Natural
Community
(Riparian), ESHA
CDFW G5:S4 Observed on site,
mapped in ESHA
report.
Arena Creek Perennial Stream,
ESHA
Jurisdictional under
Clean Water Act.
NMFS Essential Fish
Habitat
Observed on site,
mapped in ESHA
report.
Point Arena
Mountain Beaver
Special-Status Species Federal Endangered,
CDFW Species of
Special Concern
Not observed on site,
high potential of
occurrence.
Consultation with
CDFW regarding the
project determined
that PAMB is not
located onsite.
Western pond
turtle
Special-Status Species CDFW Species of
Special Concern
Not observed on site,
presence is
presumed.
California redlegged frogSpecial-Status Species Federal Threatened, CDFW Species of
Special Concern
Not observed on site,
presence is
presumed.
City of Point Arena Wildflower East
29 Steelhead Special Status Species Federal Threatened, CDFW Species of
Special Concern.
Not observed on site,
presence is
presumed.
Coho Salmon Special Status Species Federal Endangered,
State Endangered.
Not observed on site,
presence is
presumed.
The habitats (Red Alder forest and Arena Creek) for the listed special-status species are considered riparian and a perennial stream, and protection of these habitats is specifically discussed and mitigation measures are recommended to offset potential impacts. Regarding the special-status species with the potential to occur on the Project site, Ms. Korhummel consulted USFWS and CDFW regarding the presumed presence or high potential for the presence of the PAMB, Western pond turtle, California red-legged frog, Steelhead and Coho Salmon.
Point Arena Mountain Beaver (PAMB)
A subspecies of the mountain beaver, PAMB is endemic to a small portion of the Mendocino County coast in the vicinity of Point Arena, specifically from two miles north of Bridgeport Landing to three miles south of Moat Creek and inland five miles from the Pacific Ocean. The USFWS considers PAMB potentially present in suitable habitat areas within two miles of documented occurrences. The nearest documented occurrence to the Study Area is located approximately 700 feet to the southwest. A protocol-level PAMB survey was conducted in 2017 with the assistance of USFWS due to presence of suitable habitat along the Arena creek and in adjacent parcels within 100 feet of the Study Area. No sign of PAMB occupancy was found. An additional survey was conducted by USFWS in 2022 within the same vicinity of the 2017 survey.
No evidence of PAMB occupancy was found. Through on-site surveys and USFWS consultation, the report concludes that PAMB is not present and no take of PAMB is anticipated from the project.
California Red-Legged Frog (CRLF)
The CRLF is the only native “pond frog” found throughout much of California. The report analyzes the potential for CRLF presence on the Project site, and the potential for breeding activity along Arena Creek. The report concludes that the creek flow rates during CRLF breeding season are likely too high for breeding CRLF. However, CRLF may disperse across the Project site during the wet season prior to breeding or take refuge in moist sites near the stream during non-breeding/dispersal times. The nearest documented occurrence is in the Garcia River, approximately 2.3 miles to the north.
Western Pond Turtle (WPT)
The WPT is the only native freshwater turtle in California. Turtles require suitable aquatic habitat for most of the year; however, WPT often occupies creeks, rivers, and coastal lagoons that become seasonally unsuitable. To escape periods of high-water flow, high salinity, or prolonged dry conditions, WPT may move upstream and/or take refuge in vegetated, upland City of Point Arena Wildflower East
30 habitat for up to four months. Although upland habitat is utilized for refuging and nesting, this species preferentially utilizes aquatic and riparian corridors for movement and dispersal. WPT nests from late April through July. This species requires open, dry upland habitat with friable soils for nesting and prefer to nest on unshaded slopes within 15 to 330 feet of suitable aquatic habitat. The Study Area contains a perennial stream which may provide suitable dispersal habitat. The riparian area along the stream is also suitable dispersal habitat. Nesting on adjacent uplands is unlikely due to regular human activity, per the report.
Steelhead
Northern California Distinct Population Segment (DPS) (Onocorhynchus mykiss: steelhead), Federal Threatened, CDFW Species of Special Concern. The federal designation refers populations occurring below impassable barriers in coastal basins from Redwood Creek to, and including, the Gualala River. The state designation refers only to the summer-run. The majority of adult steelhead enter the river in the fall or winter and spawn in early winter or spring, although summer-run steelhead enter much earlier in late spring to early summer and spawn winter or spring. Spawn in cool, clear streams with high dissolved oxygen and gravel riffle substrate. Deeper pools with sufficient riparian cover for rearing are necessary for successful breeding.
Coho salmon
Central California Coast Evolutionarily Significant Unit(ESU) (O. kisutch: coho), Federal Endangered, State Endangered. The Central California Coast ESU includes all naturally spawned populations of coho salmon (and their progeny) in California streams from the Eel River to Aptos Creek, including the Russian River and its tributaries, excluding the Sacramento-San Joaquin River Basin. Coho salmon typically migrate in late fall to early winter to spawn in smaller coastal streams. Spawning migration known as “runs” occur throughout the year. Arena Both steelhead and coho are likely to occur within Arena Creek, and may rear as juveniles for one or more years before migrating to the ocean. As such these species have a high potential to be present in the summer as rearing juveniles. Adults would only be present in the late fall through early spring (November through April) when migrating inland for spawning. Eggs and fry would be present in the creek in winter and early spring (December through April), while and emigrating smolts would be anticipated to leave the system in the late winter through spring (February through May). Therefore, the most critical life phases of salmonids as well as any migratory events would only be present at times outside of when work is proposed in accordance to the measures below. Only rearing juvenile steelhead and coho may be present year-round in waters of the Study Area.
In conclusion, California red-legged frog or western pond turtle may utilize the undeveloped portion of the Project site or riparian habitat as upland dispersal habitat during the rainy season or as upland refugia during the dry season; if CRLF is present, then “take” of CRLF may occur.
Use of existing developed land by CRLF or WPT is unlikely. Both steelhead and coho are likely City of Point Arena Wildflower East
31 to occur within Arena Creek, and “take” may occur, however the most critical life phases of salmonids as well as any migratory events would only be present at times outside of when work is proposed in accordance with the Mitigation Measures below.
Mitigation Measures BIO-1a-b, BIO-2a-d, BIO 3a-d, BIO 4a-h, BIO 5a, BIO-7a, BIO-7b, BIO-7c and BIO-7d would reduce impacts to special-status species to a less than significant level.
Windmill Impacts. Additionally, the Biologist who prepared the Biological Report did not notice that the project site plan includes a windmill. The proposed windmill would be 40 feet and has the potential to impact both birds and bats through accidental collisions. As this potential impact was not analyzed in the Biological Report, the applicant was provided the option of paying for an additional report that would analyze potential impacts to bird and bats or a mitigation measure would be required that would remove the windmill from the project. The applicant chose to eliminate the windmill from the project per Mitigation Measure BIO-6a.
The proposed mitigation measures will reduce the limited potential for impacts to special status species and their habitats to a less than significant level. b) Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? Less than Significant Impact with Mitigation
The Project site contains a Red Alder forest alliance, a habitat defined by dominant red alder in the tree canopy that typically occurs on and along watercourses. Arena Creek is the perennial stream within the Study Area and is located along the southern boundary. The ESHA report determined that the Project has the potential to impact the Red Alder forest alliance and Arena Creek habitats, due to proximity of proposed development to these resources.
Riparian vegetation is present along the banks of Arena Creek. The canopy is intermittent and dominated by red alder with Sika willow and Pacific willow. The English ivy and Himalayan blackberry are invading the riparian vegetation. To prevent degradation to the existing structures, portions of riparian vegetation adjacent to structures are regularly maintained through weed-eating and tree pruning.
Potential project impacts:
Five new very small lodging units are proposed between the 50 ft and 100 ft buffer from the edge of the riparian vegetation.
Improvements are proposed to the existing southern structure (including painting, reroofing, and upgrades to existing features) which is located immediately adjacent to the riparian area, within the 50 ft buffer.
Additionally, the southwest portion of the southern structure would be entirely replaced, and this structure is located within the 50 ft buffer from a riparian ESHA.
City of Point Arena Wildflower East
32 The Biological Report identifies the following potential riparian impacts:
BIO IMPACT 1: Approximately 0.07-acre of the undeveloped 100-foot buffer will be permanently impacted through development of the rental units and a parking lot. Approximately 0.04-acre of the undeveloped buffer will be temporarily impacted from grading and land disturbance during construction. Temporary impacted areas will return to pre-construction conditions (i.e., non-native herbaceous vegetation) following construction.
The report recommends Mitigation Measures BIO-1a and BIO-1b to reduce this potential impact to a less than significant impact. These recommended mitigation measures are required by this MND.
BIO IMPACT 2: Land disturbance activities may create conditions which could cause erosion, sediment deposition, or pollution into riparian vegetation and/or Arena Creek.
The report recommends Mitigation Measures BIO-2a, BIO-2b, BIO-2c, BIO-2d to reduce this potential impact to a less than significant impact. These recommended mitigation measures are required by this MND.
BIO IMPACT 3: Installation and removal of scaffolding around existing structures will occur in riparian vegetation. Existing riparian vegetation will be trampled for installation and for access during improvements. Scaffolding will reduce regular trampling for most of the vegetation as the vegetation will be located under the scaffolding. However, City of Point Arena Wildflower East
33 portions within the pathway for access to the scaffolding will be trampled regularly.
Building improvements may introduce debris or pollutants (i.e., paint, etc.) into the riparian vegetation.
The report recommends Mitigation Measures BIO-3a, BIO-3b, BIO-3c, BIO-3d to reduce this potential impact to a less than significant impact. These recommended mitigation measures are required by this MND.
BIO IMPACT 4: California red-legged frog or western pond turtle may utilize the undeveloped portion of the Project Area or riparian habitat as upland dispersal habitat during the rainy season or as upland refugia during the dry season; if CRLF is present, then “take” of CRLF may occur. Use of existing developed land by CRLF or WPT is unlikely.
The report recommends Mitigation Measures BIO-4a through BIO-4h to reduce this potential impact to a less than significant impact. These recommended mitigation measures are required by this MND.
The proposed mitigation measures would reduce these impacts to the riparian habitat to a less than significant level.
c) Would the project have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? Less than Significant Impact with Mitigation
The proposed project will not have a substantially adverse effect on this stream through removal, filling or hydrological interruption. However, it could have an impact through other means as analyzed in section c) above. The mitigation measure proposed for c) above will also mitigate potential impacts to the perennial stream.
The Project will have an effect that less than significant with mitigation through the implementation of the required biological mitigation measures in this MND. d) Would the project interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? Less than Significant Impact
Migratory Fish. The Biologist prepared a “Special-Status Fish Assessment Addendum to ESHA Survey Report of 135 Main Street” which analyzed the potential impacts of the project on Steelhead and Coho Salmon. Arena creek is present in the Study Area, with the top-of-bank (TOB) located immediately adjacent to existing developed areas that are proposed for remodeling. Arena Creek is identified as critical habitat for steelhead and coho, with documented occurrences of steelhead within the creek (CDFW 2024) and is considered City of Point Arena Wildflower East
34 essential fish habitat (NMFS 2024b). Arena Creek is likely to support rearing fish, including coho and steelhead. The species are described below.
Steelhead - Northern California Distinct Population Segment (DPS) (Onocorhynchus mykiss: steelhead), Federal Threatened, CDFW Species of Special Concern. The federal designation refers populations occurring below impassable barriers in coastal basins from Redwood Creek to, and including, the Gualala River. The state designation refers only to the summer-run. The majority of adult steelhead enter the river in the fall or winter and spawn in early winter or spring, although summer-run steelhead enter much earlier in late spring to early summer and spawn winter or spring. Spawn in cool, clear streams with high dissolved oxygen and gravel riffle substrate. Deeper pools with sufficient riparian cover for rearing are necessary for successful breeding.
Coho salmon - Central California Coast Evolutionarily Significant Unit(ESU) (O. kisutch:
coho), Federal Endangered, State Endangered. The Central California Coast ESU includes all naturally spawned populations of coho salmon (and their progeny) in California streams from the Eel River to Aptos Creek, including the Russian River and its tributaries, excluding the Sacramento-San Joaquin River Basin. Coho salmon typically migrate in late fall to early winter to spawn in smaller coastal streams. Spawning migration known as “runs” occur throughout the year.
Most adult fish return “home” maintaining fidelity to their natal stream. Preferred spawning habitat for coho salmon is small freshwater streams with cool to cold water temperature, medium to small gravel substrate, and high dissolved oxygen levels at the head of a riffle where water changes from laminar flow to turbulent flow (providing greater dissolved oxygen).
Abundant riffle areas (shallow areas with gravel substrate) for spawning and deeper pools with sufficient riparian cover for rearing are necessary for successful breeding. Spawning occurs mainly between November and January, but can occur as late as March during drought conditions. The memo notes that: “salmonoid critical life phases and migration events would happen outside of the work window” as mitigated by MM BIO-7d.
The Addendum includes a comprehensive Development Criteria Analysis based on the City of Point Arena Municipal Code 18.25.220 and 18.25.240. The project complies with the buffer analysis given the comprehensive list of Biological mitigation measure required.
Migratory Wildlife. The site is located within developed land within a rural city of Mendocino County. While common wildlife species presumably utilize the site to some degree for movement at a local scale, the Study Area itself does not provide corridor functions beyond connecting similar forested and heavily wooded land parcels in surrounding areas. The ESHA report concludes that the portion of the stream in the Project Area is surrounded by development and regular human activity, and the proposed Project is unlikely to result in any significant impacts to wildlife movement.
City of Point Arena Wildflower East
35 BIO IMPACT 7: Construction related activity may disturb special-status Steelhead and Coho Salmon.
The report addendum recommends Mitigation Measures BIO-7A, BIO-7B, BIO-7C and BIO-7D to reduce this potential impact to a less than significant impact. These recommended mitigation measures are required by this MND.
e) Would the project conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? Less than Significant Impact with Mitigation
The entire City of Point Arena is located within the Coastal Zone and is subject to the California Coastal Act. The California Coastal Commission has approved the City’s Local Coastal Program (LCP), which includes components of the General Plan and the Zoning Ordinance as implementation plans. Policies in the Open Space and Conservation Element of the General Plan and regulations in the Zoning Ordinance have been adopted to protect biological resources.
Specifically, the LCP requires the identification of ESHAs (as defined in the Coastal Act and elsewhere) and requires that all development be buffered at least 100 feet from identified ESHA. The LCP allows for a reduction in the buffer area between ESHA and development after performing a reduced buffer analysis, and consultation with CDFW that a 50-foot buffer is adequate to protect the resource.
The City of Point Arena defines an Environmentally Sensitive Habitat Area (ESHA) as:
“An area in which plant or animal lifer or their habitats are either rare or especially valuable because of their special nature or role in the ecosystem and which could be easily disturbed or degraded by human activities and developments.”
The Biological Report identified a Red Alder ESHA, and so these regulations apply to this project.
Additionally, the City of Point Arena Municipal Code includes different regulations related to new development within an ESHA or ESHA buffer and Repair, Replacement of existing development within an ESHA or ESHA buffer as follows:
Section 18.25.220 Development in or Adjacent to Environmentally Sensitive Habitat Area: No new development shall be allowed within or adjacent to riparian corridors along Arena Creek, or other Environmentally Sensitive Habitat Areas where mapped (on the opportunities and constraints map: biological resources and trails) or other unmapped ESHAs that meet the ESHA criteria contained in Land Use Plan (LUP) Chapter X Section 2.4 without first obtaining appropriate permits. New development includes, but is not limited to, vegetation removal, grading, filling, soils or refuse dumping, and the alteration of creek banks. New development adjacent to ESHA City of Point Arena Wildflower East
36 shall provide native vegetation buffer areas to serve as transitional habitat and provide distance and physical barriers to human intrusion.
The buffer area shall be a minimum of 100 feet and shall be larger if necessary to protect the resources of the particular habitat area from possible significant degradation caused by the proposed development. No buffer may be lessthan 100 feet unlessit can be demonstrated, based on the criteria below and after city consultation with the California Department of Fish and Wildlife, that 100 feet is not necessary to protect the resources of the particular habitat area from possible significant degradation caused by the proposed development. No buffer area may be less than 50 feet in width.
The buffer area shall be measured from the nearest outside edge of the ESHA. For a wetland the buffer shall be measured from the upland edge of the wetland. For riparian areas, the buffershall be measured from the outer edge of the canopy of riparian vegetation. Where riparian vegetation is not present, the buffer shall be measured from the outer edge of the bank of the subject stream. For coastal bluff ESHA, the buffer shall be measured from the bluff edge (as defined in Appendix A). For plant community ESHAs, the buffer shall be measured from the outer edge of the plants that comprise the plant community. Point Arena Mountain beaver buffer area is described in Section 18.25.240.
Pre-existing buildings and non-conforming uses within riparian buffer zones may continue as legally non- conforming, but no additions that encroach closer to the stream or creek shall be permitted, with the following exceptions contingent upon the four required findings described below:
1. Required Findings
a) The proposed development has been sited and designed to prevent significant impactsto the habitat values, functional capacity, and species diversity of the adjacent riparian habitat area.
b) The proposed development is compatible with the continuance of such habitat areas.
c) Soils and vegetation removal and disturbances shall be minimized. d) Non-native vegetation shall not be planted except for the continuance of existing agricultural practices.
The proposed project includes repair and reconstruction of existing structures that are located within the 50-foot buffer area of the Red Alder ESHA and associated riparian area and perennial stream.
The proposed work on the pre-existing buildings would not encroach further into the riparian buffer and thus can continue as legal non-conforming uses. The applicant has proposed to construct a new two-foot-high retaining wall which would encroach an addition foot info the buffer on the south side of the building. The eastern portions of the retaining wall do not encroach further into the ESHA or ESHA buffer. It may be difficult to make the findings with respect to the construction of the retaining wall along the south side of the Project’s buildings WE2 and WE1. The potential impacts of the construction of the retaining wall were included in the Biological Report which included mitigation measures to reduce the potential impacts of this construction to a less than significant impact. Nevertheless an additional Mitigation Measure BIO 6b is included to eliminate this section of the retaining wall from the project, as City of Point Arena Wildflower East
37 the General Plan Policy expressly prohibits the expansion of an existing structure further into an ESHA buffer.
The City’s General Plan includes policies that address the removal of trees for the protection of viewsheds as follows:
Land Use Policies
14. Public views, viewsheds, view corridors, buildings of architectural and historical merit, existing topographic features, and existing important clusters of trees, shall be preserved and maintained.
31. Adopt a Zoning Ordinance measure that requires development proposals to be planned in a manner to avoid removing trees, if feasible. At least two trees shall be planted for every one removed to accommodate development facilitated by the General Plan. The planting of trees shall be performed in a manner that protects public views to and along the ocean and scenic coastal areas, consistent with the visual resources policies of the LCP. Visually attractive native trees species, such as bishop pine and sargent cypress, shall be the preferred species used, as they require less water, herbicides, pesticides, and are valuable wildlife resources.
Open Space Policy
29. Construction shall minimize disturbance of natural vegetation (including significant trees, native vegetation, and root structures), and other physical or biological features important for preventing erosion and sedimentation.
Protection of Visual Resources Policy
3.9 New development shall minimize removal of natural vegetation. Existing native trees and plants shall be preserved on the site to the maximum extent feasible.
The project site includes 5-7 small trees on the north-east side of Parcel B. See image below.
City of Point Arena Wildflower East
38 Additionally, the Zoning Ordinance includes Section 17.03.060 requires that “existing trees shall be preserved in all subdivisions where feasible.” Zoning Code Section 18.25.140 includes additional landscaping and screening regulations.
Section 5.15.D 11. Includes Design Review criteria that are relevant to the protection and replacement of native trees.
Developments shall be planned to avoid removing trees, if feasible. At least two trees shall be planted for every one removed to accommodate development facilitated by the General Plan.
Visually attractive native trees species, such as bishop pine and sargent cypress, shall be the preferred species used, as they require less water, herbicides, pesticides, and are valuable to wildlife resources.
The project will have a less than significant impact on the preservation of trees with the inclusion of Mitigation Measure BIO – 6c, which requires replacement of removed trees with native trees at a ratio of 2 to 1.
f) Would the project conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan?
No Impact
City of Point Arena Wildflower East
39 There are no California Regional Conservation Plans in Mendocino County, as identified in the California Department of Fish and Wildlife’s (CDFW) Natural Community Conservation Planning (NCCP) Map. Additionally, there are no other regional or locally adopted conservation plans applicable to the City. Therefore, no impacts resulting from a conflict with an adopted conservation plan will occur from the Project construction or subsequent operations.
Mitigation Measures
BIO IMPACT 1: Approximately 0.07-acre of the undeveloped 100-foot buffer will be permanently impacted through development of the rental units and a parking lot. Approximately 0.04-acre of the undeveloped buffer will be temporarily impacted from grading and land disturbance during construction. Temporary impacted areas will return to pre-construction conditions (i.e., nonnative herbaceous vegetation) following construction.
The following mitigation measures will reduce the potential impacts to the riparian 50-to 100-foot buffer and allow the Project to meet the Required Findings:
MM BIO-1a: The riparian buffer shall be enhanced through plantings of native shrubs and management of invasive species. A plant palette of suitable native species is included in Table 2 below4
. The area of enhancement shall be a 25-foot-wide strip adjacent to the Project Area within the undeveloped 50-foot riparian buffer. The intention of the planting is to create a minimum fifty (50) percent absolute cover of the 25-foot-wide buffer with native shrubs once plants reach maturity. Implementation of plantings/irrigation/management should be overseen by landscape professionals with experience planting and maintaining native species. Invasive species shall include any CalIPC ‘High’ plants and will not include grass species5 . Management of invasive species shall
be conducted for three (3) years. Invasive species observed, or which may occur in the Study Area, and should be target species that are managed are included in Table 3.
Table 2. Native Planting Palette
Common Name Scientific Name
Wax myrtle Morella californica
California blackberry Rubus ursinus
Coyote bush Baccharis pilularis
California coffeeberry Frangula californica ssp. californica Sword fern Polystichum munitum
Red elderberry Sambucus racemosa
Oso berry Oemleria cerasiformis
Silk tassel Garrya elliptica
Table 3. Target Invasive Species
Common Name Scientific Name
English Ivy Hedera helix
City of Point Arena Wildflower East
40 Cape ivy Delairea odorata
Himalayan blackberry Rubus armeniacus
Pampas grass Cortaderia spp.
Periwinkle Vinca major
Sourcesfor locally sourced native plantingsincludesJughandle Farm Nursery, Mendocino Coast Botanical Gardens, Samara Restoration.
Control of invasive grassspecies is highly challenging, and that level of restoration is determined not necessary for this project due to existing conditions and proposed Project.
MM Bio 1b: Only native plant species shall be included in landscaping within the 100-foot riparian buffer.
BIO IMPACT 2: Land disturbance activities may create conditions which could cause erosion, sediment deposition, or pollution into riparian vegetation and/or Arena Creek.
MM BIO 2a: Land disturbance activities will occur during the general dry season June 1 through October 15. Erosion control measures (i.e., weed-free, jutes straw waddle, weedfree straw bales, silt fencing, tarps) shall be staged on-site prior or at initiation of land disturbance activities in case rain-event may occur.
MM BIO 2b: If a rain event in excess of 0.25-inch over a 24-hour period occurs during the construction phase, all activities shall cease for 24 hours after perceptible rain ceases.
Erosion control measures (e.g., weed-free straw waddle, weed-free straw bales, cover bare soil) shall be deployed in the event of unseasonable rains.
MM BIO 2c: Spill prevention materials shall be on-site for all materials and equipment; all construction personnel shall stop work and deploy spill prevention materials in the event of escaped petrol, oil, solvents, paints, etc. No equipment or other materials which may cause pollution to the riparian/stream shall be stored or staged within the 100-foot riparian buffer.
MM BIO 2d: To minimize soil and vegetation disturbance within the buffer, temporary fencing shall be placed at the edge of land disturbance activities and outside the 50-foot buffer. No land disturbance or material/equipment staging shall occur outside the fencing and construction staff will be informed on the purpose of the fencing. Fencing shall be removed upon completion of the Project.
BIO IMPACT 3: Installation and removal of scaffolding around existing structures will occur in riparian vegetation. Existing riparian vegetation will be trampled for installation and for access during improvements. Scaffolding will reduce regular trampling for most of the vegetation as the vegetation will be located under the scaffolding. However, portions within the pathway for access to the scaffolding will be trampled regularly. Building improvements may introduce debris or pollutants (i.e., paint, etc.) into the riparian vegetation.
MM BIO 3a: Use of the scaffolding within riparian vegetation shall be limited to the minimum amount necessary to complete necessary improvements. Scaffolding shall be installed and removed with the fewest people possible and shall remain in place for the shortest duration feasible.
MM BIO 3b: Scaffolding shall be installed and used in riparian vegetation at the driest City of Point Arena Wildflower East
41 portion of the dry season, as feasible. Natural wooden boards (i.e., not treated) shall be laid down along the access path to scaffolding within riparian vegetation.
MM BIO 3c: Construction netting shall be installed to capture any debris which may fall from the structures or scaffolding. Appropriate equipment and methods for any potential pollutant materials (i.e., paint, etc.) which are to be applied to the structures shall be used in a manner which will reduce drift, leaking or spillage. Any debris which may fall on the ground shall be removed by the end of the workday.
MM BIO 3d: No herbaceous riparian vegetation shall be removed, and no woody riparian vegetation shall be limbed or otherwise removed.
BIO IMPACT 4: California red-legged frog or western pond turtle may utilize the undeveloped portion of the Project Area or riparian habitat as upland dispersal habitat during the rainy season or as upland refugia during the dry season; if CRLF is present, then “take” of CRLF may occur. Use of existing developed land by CRLF or WPT is unlikely.
MM BIO 4a: All land disturbance of undeveloped land, including woody vegetation removal, shall occur during the dry season (June 1 through October 15) when special-status wildlife species are less likely to be dispersing.
MM BIO 4b: A qualified biologist shall conduct a pre-construction survey no more than 24 hours prior to initiation of land disturbance. The biologist shall inspect gopher holes and any other potential upland refugia where CRLF or WPT may occur. If CRLF is found, the qualified biologist shall follow instructions outlined on the USFWS Technical Assistance Letter (Appendix F). If WPT is found, the qualified biologist shall consult with CDFW.
MM BIO 4c: A biological education program shall be provided by a qualified biologist to all personnel that will be present at the site during ground disturbance and related activities.
Following worker education, each construction work member present is anticipated to have the information needed to identify each species and be relied upon to follow measures should a CRLF or WPT be observed. The worker education program shall include information regarding the identification and natural history of each species (including photographs), the potential for occurrence of each species within work areas, protocols to be followed for daily surveys, the legal status and the ramifications for take, the purpose of the exclusion fencing and importance of maintaining it, and specific measures being implemented to avoid impacts to each species. Contact information for USFWS staff and Project biologist shall be provided during the training.
MM BIO 4d: Trained workers shall conduct daily surveys for CRLF in the Project Area prior to daily work. If CRLF is observed in the course of pre-construction or daily surveys or during work, all ground disturbance shall halt and USFWS and Project biologist shall be notified immediately. The CRLF shall be addressed as outlined in the USFWS Technical Memo (bullet point 3).
MM BIO 4e: If WPT is observed in the course of construction activities, all ground disturbance shall halt, and the Project biologist shall be notified immediately. Construction activities shall resume once the WPT has exited the area of active construction and is out of harm’s way.
MM BIO 4f: All ground disturbing activities shall cease for 24 hours following a rainfall event where 0.25- inches or greater of precipitation within a 24-hour period was predicted for the Point Arena area.
City of Point Arena Wildflower East
42 MM BIO 4g: Symbolic fencing and signs shall be installed following completion of the Project to discourage human or pet entry into the buffer, riparian vegetation, and stream.
MM BIO 4h: All CRLF conditions outlined in the USFWS Technical Assistance Letter shall be observed.
BIO IMPACT 5: Construction related activity and sound may disturb nesting special-status birds in the riparian vegetation. In addition to the special-status bird, a variety of non-status bird species with baseline protections under the Migratory Bird Treat Analysis (MBTA) and CFGC may use trees and shrubs within the Study Area for nesting.
MM BIO 5a: Tree/vegetation removal and initial ground disturbance shall occur from August 16 to January 31, outside of the general bird nesting season. If tree/vegetation removal during this time is not feasible, a pre-construction nesting bird survey should be performed by a qualified biologist no more than 7 days prior to the initiation of tree removal or ground disturbance. The survey should cover the Project Area and surrounding areas within 100 feet. If active bird nests are found during the survey, an appropriate no- disturbance buffer should be established by the qualified biologist. Once it is determined that the young have fledged (left the nest) or the nest otherwise becomes inactive (e.g., due to predation), the buffer may be lifted, and work may be initiated within the buffer. If land disturbance or vegetation removal ceases for longer than 14 days, another nesting survey should be conducted prior to beginning such activities (if within nesting bird season), as nests may have been established during the time of no activity.
BIO IMPACT 6: Regulatorily Required Mitigation Measures.
MM BIO-6a: The applicant shall submit a revised site plan that does not include the proposed Windmill and the proposed windmill shall not be constructed as part of this project.
MM BIO 6b: That applicant shall submit a Building Permit for this project which does not include construction of the retaining wall along the southern edge of Building W/E 1 and Building W/E 2.
MM BIO-6c: prior to issuance of the building Permit, the applicant shall submit a landscaping plan that illustrates at least 14 native California trees. The trees shall be planted prior to approval of the building permit final.
BIO IMPACT 7: Construction related activity may disturb special-status Steelhead and Coho Salmon.
MM BIO-7A: No construction related debris will be staged within the 50-foot buffer, or in areas where such debris may wash into the creek. Any refueling of equipment should also occur outside of the 100-foot riparian buffer.
MM BIO-7B: Under no circumstances should any wash water or wastewater from construction be allowed to enter Arena Creek.
MM BIO-7C: Construction netting or tarps should be installed beneath scaffolding along the creek to capture any debris which may fall from the structures or scaffolding, preventing it from entering Arena Creek. Appropriate equipment for application of materials (i.e., paint, etc.) which is to be applied to the structures should be used. The manner in which materials are applied should be the least likely to cause drift, leaking or City of Point Arena Wildflower East
43 spillage. Any debris which may fall on the ground should be removed by the end of the workday.
MM BIO-7D: Land disturbance activities will occur during the general dry season June 1 through October 15. Erosion control measures (i.e., weed-free jutes straw waddle, weedfree straw bales, silt fencing, tarps) should be staged and installed on-site prior or at initiation of land disturbance activities in case rain-event may occur. e. CULTURAL RESOURCES
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Cause a substantial adverse change in
the significance of a historical resource
pursuant to § 15064.5?
b) Cause a substantial adverse change in
the significance of an archaeological
resource pursuant to § 15064.5?
c) Disturb any human remains, including
those interred outside of dedicated
cemeteries?
Existing Cultural Resources Setting
Pre-Historic. Ethnographic and historical research indicates that the project area is within the traditional territory of the Bokeya Pomo, a Tribe of the Central Pomo. For the purposes of this report, the NAHC was contacted and asked to provide a sacred lands search and a list of Native American individuals to contact for this portion of Mendocino County. The Cahto Tribe, Coyote Valley Band of Pomo Indians, Guidiville Indian Rancheria, Hopland Band of Pomo Indians, Manchester Point Arena Band of Pomo Indians, Noyo River Indian Community, Pinoleville Pomo Nation, Potter Valley Tribe, Redwood Valley Pomo Indians, Robinson Rancheria of Pomo Indians, Round Valley Reservation, Sherwood Valley Band of Pomo Indians, Yokayo Tribe were contacted during the course of this investigation.
Historic. Historic period occupation, at what is now the City of Point Arena, is thought to have begun with Samuel Campbell and David and Elijah Beebee, in 1855. The entire townsite and all of the current project location was part of a 240-acre patent by Richard Harrison in 1874, by City of Point Arena Wildflower East
44 which time the population of the town had increased to over 1,000 and then decreased slightly after a national depression. Harrison gained fame as the surveyor of the 18,000-acre Sanel Grant, a Spanish land grant in the Russian River Valley, where he was also involved in the first two recorded land deeds in Mendocino County, in 1859, before working as an attorney and county judge in Ukiah.
The Point Arena Main Street Historic Commercial District covers many of the main street frontage buildings and is listed on the National Register of Historic Places (NRHP) (#90001364) under Criterion A, for the District’s association to commercial developments of the city between 1893-1940 and generally designated after the city-wide fire that resulted in the loss of many buildings. The former Standard Oil Station building at 165 Main Street is part of the Project and is listed as a contributor to the District.
Archaeological Survey. During the autumn of 2023, William Rich and Associates (WRA) completed a cultural resources survey at Assessor’s Parcel Numbers (APN) 027-122-020 and 027-122-021, at 135 Main Street and 165 Main Street in Point Arena, Mendocino County, California. This commercial property is proposed for new development at the request of the landowners.
The purpose of the cultural resources investigation is to document if significant cultural resources are located within the proposed project area. Pursuant to Section 15064.5 of the California Environmental Quality Act (CEQA), Public Resources Code (PRC) 21074, significant cultural resources qualify for inclusion to the California Register of Historical Resources (CRHR) as either a historical resource, a tribal cultural resource, or a unique archaeological resource.
The environmental review process requires that federal and state agencies implement these procedures to identify and evaluate the significance of cultural resources and to assess potential effects on those cultural resources from the proposed project.
The methods used in the investigation included a search of the survey reports and resource records held within the databases of the California Historical Resources Information System’s Northwest Information Center (NWIC), and a review of other archaeological and historical grey literature and published literature for this project location available online and within this authors database. Correspondence was conducted with the Native American Heritage Commission (NAHC), tribal representatives, and other knowledgeable individuals. A field survey was performed of the entire project area which encompassed 1.3 acres, on October 12, 2023.
Much of the project area was investigated by surveying the eastern half of the ownership, where mineral soils are accessible. A shovel was used at regular intervals to excavate small holes and broadcast the contents over the ground for inspection. In other areas, trenching and construction disturbances have exposed soils beneath the existing parking lot, and basement and foundation work has exposed the soils beneath one of the hotel buildings. Some of the western half of the project area is covered with buildings or paved in asphalt and concrete. No Native American or historic period artifacts, features, sites or other cultural resources were identified during the field survey.
City of Point Arena Wildflower East
45 Cultural Resources Impact Discussion
a) Would the Project cause a substantial adverse change in the significance of a historical resource pursuant to § 15064.5?
Less than Significant Impact.
As a result of this investigation, the project archaeologist recommends that the remaining buildings which formerly constituted the Sea Shell Inn do not qualify as a historical resource for the purposes of CEQA (15064.5 (a)). The original hotel at this location was in place by 1946; it was expanded around 1970 and operated as the Sea Shell Inn until it closed in 2011, after which it was partially demolished. The former Standard Oil Station building, at 165 Main Street, is within the Point Arena Main Street Historic Commercial District (NRHP #90001364). This building remains standing and is being remodeled consistent with its architectural merits described in the District record by Napoli and Lortie (1990), and will remain in use as a commercial storefront. All other buildings in the survey area that remain standing were built after the period of significance of the District (1893-1940), and thus do not appear to contribute to the significance of the District, nor would be considered individually eligible for listing. These buildings are not associated with either events (CRHR Criterion 1) or persons (Criterion 2) important in California’s history, and it is unlikely that the features will yield important information (Criterion 4), other than what is captured in this report, nor do these buildings meet Criterion 3. They do not embody the distinctive characteristic of any particular architecture, their method of construction is not distinctive, nor do they represent the work of an important creative person or possess high artistic values.
It is possible that small scale, scattered and fragmentary items including historic-period artifacts such as bottle fragments, construction materials (brick, concrete, wood, nails) and other refuse will be encountered during ground disturbing activities associated with project implementation, particularly along Main Street and Mill Street, but work should not be stopped in this area given the already well-documented commercial and residential history of the project area. In the event significant concentrations or features (privies, refuge lined pits or cellar, brick foundations) are uncovered, Mitigation Measure CUL-1 shall be followed.
The project will have a less than significant impact on historic resources with the implementation of the required mitigation measures.
b) Would the Project cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5?
Less than Significant Impact with Mitigation
It is anticipated, by the Archaeologist, that there will be no affect to Native American archaeological resources as none have been identified at the project location, either through City of Point Arena Wildflower East
46 previous ethnographic and archaeological investigations, or during the current survey effort.
However, isolated Native American cultural resources such as flaked-chert toolstone debitage or edged tool fragments could also be present, but have not been found to date. If substantial quantities of such artifacts, which may constitute a feature, such as a cooking hearth containing quantities of fire-cracked rock, faunal remains, or human burials are discovered during project implementation, the Mitigation Measure MM-CUL 1 for inadvertent discovery of cultural resources shall be followed.
The project will have a less than significant impact on archaeological resources with the implementation of the required mitigation measures.
c) Would the Project disturb any human remains, including those interred outside of dedicated cemeteries?
Less than Significant Impact with Mitigation
There are no known human remains on this site, however they can be discovered during excavations and Mitigation Measure CUL-2 would reduce the impacts of such an accidental discovery to less than significant.
Mitigation Measures
CUL-1: If cultural or historic resources are encountered during construction activities, all onsite work shall cease in the immediate area and within a 50 foot buffer of the discovery location. A qualified archaeologist will be retained to evaluate and assess the significance of the discovery, and develop and implement an avoidance or mitigation plan, as appropriate. For discoveries known or likely to be associated with Native American heritage (precontact sites and select historic period sites), the tribal representatives listed in the Archaeological Report Section 6.2 shall be contacted immediately to evaluate the discovery and, in consultation with the project proponent, the County, and consulting archaeologist, develop a treatment plan in any instance where significant impacts cannot be avoided.
CUL 2 - In the event that human remains are encountered, all work must stop in the immediate vicinity of the discovered remains and the Mendocino County Medical Examiner, the Sheriff-Coroner, and a qualified archaeologist must be notified immediately to evaluate the remains. If the remains are deemed to be Native American and prehistoric, the Native American Heritage Commission must be contacted by the Coroner so that a “Most Likely Descendant” can be designated and further recommendations regarding treatment of the remains can be provided.
City of Point Arena Wildflower East
47 f. ENERGY
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Result in potentially significant
environmental impact due to wasteful,
inefficient, or unnecessary consumption
of energy resources, during Project
construction or operation?
b) Conflict with or obstruct a state or
local plan for renewable energy or
energy efficiency?
Existing Energy Setting
Energy resources include electricity, natural gas, and other fuels. The production of electricity requires the consumption or conversion of energy resources, including water, wind, oil, gas, coal, solar, geothermal, and nuclear resources, into energy. Energy production and use result in the depletion of nonrenewable resources such as oil, natural gas, and coal, as well as the emission of pollutants. Energy usage is typically quantified using the British Thermal Unit (BTU).
The BTU is the amount of energy required to raise the temperature of one pound of water by one-degree Fahrenheit. The approximate amount of energy contained in a gallon of gasoline, 100 cubic feet (one therm) of natural gas, and a kilowatt hour of electricity is 123,000 BTUs, 100,000 BTUs, and 3,400 BTUs, respectively.
Electricity
The production of electricity requires the consumption or conversion of energy resources, including water, wind, oil, gas, coal, solar, geothermal, and nuclear resources, into energy. The delivery of electricity involves several system components, including substations and transformers that lower transmission line power (voltage) to a level appropriate for on-site distribution and use. Electricity generated is distributed through a network of transmission and distribution lines commonly called a power grid.
Energy capacity, or electrical power, is generally measured in watts while energy use is measured in watt-hours. For example, if a light bulb has a capacity rating of 20 watts, the energy required to keep the bulb on for 1 hour would be 20 watt-hours. On a utility scale, a generator’s capacity is typically rated in megawatts, which is one million watts, while energy City of Point Arena Wildflower East
48 usage is measured in megawatt-hours (one million-watt hours) or gigawatt-hours (GWh), which is one billion watt-hours.
California Energy Consumption
According to the California Energy Commission (CEC), total system electric generation for California in 2018 was 285,488 gigawatt-hours (GWh). California’s non-CO2 emitting electric generation categories (nuclear, large hydroelectric, and renewable generation) accounted for more than 53 percent of total in-state generation for 2018. California's in-state electric generation was 194,842 GWh and electricity imports were 90,648 GWh.
According to the CEC, nearly 45 percent of the natural gas burned in California was used for electricity generation, with the remainder consumed in the residential (21 percent), industrial (25 percent), and commercial (9 percent) sectors. In 2012, total natural gas demand in California for industrial, residential, commercial, natural gas vehicles, and electric power generation was 2,313 billion cubic feet.
According to the CEC, gasoline has remained the dominant fuel within the transportation sector, with diesel fuel and aviation fuels following. In 2016, California consumed approximately 15 billion gallons of gasoline and approximately 3.35 billion gallons of diesel fuel. An increasing amount of electricity is being used for transportation energy, which is attributed to light-duty plug-in electric vehicles. In 2016, transportation in California, consisting of light-duty vehicles, medium/heavy-duty vehicles, trolleys, and rail transit, consumed approximately 1.53 million megawatt hours (MWh).
Sonoma Clean Power
Sonoma Clean Power is a program that allows businesses and residents in Mendocino and Sonoma Counties to purchase energy created from renewable resources, including geothermal, solar, wind, water, and biomass. This service provides energy through alternative generation processes while using existing infrastructure through PG&E for delivery. By using existing delivery infrastructure, Sonoma Clean Power is billed to customers through PG&E for providing electric generation service. In 2016, 88% of eligible customers were receiving electricity from Sonoma Clean Power. As of 2018 Sonoma Clean Power had 39% fewer greenhouse gas emissions as compared to PG&E.
Point Arena General Plan
The Project is subject to goals, policies, and implementation measures set forth in the Point Arena General Plan which seek to reduce energy consumption. The following are particularly relevant to the proposed Project.
Policies relevant to the residential portion of the project include:
12.5. Goal 5: Resource Conservation
TO PROMOTE ENERGY AND WATER CONSERVATION IN NEW AND EXISTING City of Point Arena Wildflower East
49 RESIDENTIAL UNITS THROUGH RESOURCE-EFFICIENT DESIGN, SITING, AND LANDSCAPING.
(A) Policies and Programs
a) Encourage, through zoning, the construction of new housing within or close to the downtown core area to reduce the need for long extension of utilities and to reduce commuting time.
b) Encourage, through zoning, the development of new houses in clusters or attached structures to reduce use of land and materials.
c) Encourage, through code provisions and requirements, the use of solar energy systems and water-saving devices.
c) Identify and help educate residents about the availability of consumer programs, such as P.G. & E. services, to assist seniors.
A General Plan goal for the entire project is included as follows:
2.7. Goal #7: Promote Energy Conservation and Recycling Preserving non-renewable energy resources, promoting the recycling of household and industrial products, and minimizing unnecessary disposal of solid wastes when alternatives are available are national, state, and county goals that the City of Point Arena shall adhere to in the small ways available to it. Among the goals are recovering materials from solid wastes, promoting the use of solar energy, and developing land-use regulations and Zoning Ordinance provisions for new subdivisions that mandate the maximum possible reliance upon passive solar heating or other energy-saving features.
Energy Impact Discussion
(a) Would the Project result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during Project construction or operation?
Less Than Significant Impact
The project will use energy during construction, remodeling and operation.
Construction Activities
There are no unusual Project characteristics that would need construction equipment or practices that would be less energy efficient than at comparable construction sites in the region or state. Construction activity would be temporary and fuel consumption associated with construction activities would cease once construction is completed. Due to the temporary nature of construction activities, the fuel and energy needed during construction would not be considered a wasteful or inefficient use of energy. Therefore, it is expected that construction energy consumption associated with the Project would be comparable to other similar construction projects, and would therefore not be inefficient, wasteful, or unnecessary.
City of Point Arena Wildflower East
50 Operation
Long-term operational energy use from this visitor serving hotel, restaurant and residential development would include electricity consumption associated with the operation of the buildings (e.g., lighting, electronics, heating, air conditioning, refrigeration), energy consumption related to water usage and solid waste disposal, and fuel consumption (gasoline and diesel) from the generation of new vehicle trips.
While the operation of mixed-use project would result in an increase in energy consumption compared to existing conditions, the Project would be required to incorporate design measures related to electricity and water use in compliance with Title 24, and all applicable requirements of the City of Point Arena to minimize energy consumption. Furthermore, Sonoma Clean Power is the default provider in the City of Point Arena and would provide clean energy from renewable resources. As such, the proposed Project would not result in the wasteful, inefficient, and unnecessary consumption of energy and impacts would be less than significant. (b) Would the Project conflict with or obstruct a state or local plan for renewable energy or energy efficiency?
Less than Significant Impact
The City of Point Arena does not currently have a locally adopted plan addressing renewable energy and energy efficiency.
In December 2007, the CEC prepared the State Alternative Fuels Plan in partnership with the CARB and in consultation with the other state, federal, and local agencies. The plan presents strategies and actions California must take to increase the use of alternative non-petroleum fuels in a manner that minimizes costs to California and maximizes the economic benefits of instate production. The plan assessed various alternative fuels and developed fuel portfolios to meet California’s goals to reduce petroleum consumption, increase alternative fuels use, reduce greenhouse gas emissions, and increase in-state production of biofuels without causing a significant degradation of public health and environmental quality. The project will require installation of energy conservation features in compliance with CalGreen and California Energy codes. As such, the proposed Project would not conflict with or obstruct implementation of the State Alternative Fuels Plan and impacts would be less than significant.
City of Point Arena Wildflower East
51 g. GEOLOGY AND SOILS
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Directly or indirectly cause potential
substantial adverse effects, including the
risk of loss, injury, or death involving:
i) Rupture of a known
earthquake fault as
delineated on the most
recent Alquist-Priolo
Earthquake Fault Zoning
Map, issued by the State
Geologist for the area or
based on other substantial
evidence of a known fault?
ii) Strong seismic ground
shaking?
iii) Seismic-related ground
failure, including
liquefaction?
iv) Landslides?
b) Result in substantial soil erosion or
the loss of topsoil?
c) Be located on a geologic unit or soil
that is unstable, or that would become
unstable as a result of the Project, and
potentially result in on- or off-site
landslide, lateral spreading, subsidence,
liquefaction or collapse.
d) Be located on expansive soil, as
defined in Table 18-1-B of the Uniform
Building Code, creating substantial direct
or indirect risks to life or property.
e) Have soils incapable of adequately
supporting the use of septic tanks or
alternative wastewater disposal systems
City of Point Arena Wildflower East
52 where sewers are not available for the
disposal of wastewater?
f) Directly or indirectly destroy a unique
paleontological resource or site or
unique geologic feature?
Existing Geology and Soils Setting
Mendocino County is located within the California Coast Range geomorphic province. This province is a geologically complex and seismically active region characterized by sub-parallel northwest-trending faults, mountain ranges and valleys. The oldest bedrock units are the Jurassic-Cretaceous Franciscan Complex and Great Valley sequence sediments originally deposited in a marine environment. Subsequently, younger rocks such as the Tertiary-age Sonoma Volcanics group, the Plio-Pleistocene-age Clear Lake Volcanics and sedimentary rocks such as the Guinda, Domengine, Petaluma, Wilson Grove, Cache, Huichica and Glen Ellen formations were deposited throughout the province. Extensive folding and thrust faulting during late Cretaceous through early Tertiary geologic time created complex geologic conditions that underlie the highly varied topography of today. In valleys, the bedrock is covered by thick alluvial soil. The Project site is underlain by Miocene aged marine sedimentary rocks. These deposits are shown to consist of moderately to well consolidated sandstone, shale, siltstone, conglomerate, and breccia.
Active faults within the area that could generate strong ground shaking include the San Andreas and Maacama faults. The San Andreas fault runs approximately 2.5 miles north of the City and project site, and the Maacama fault runs approximately 32 miles to the east. Both faults are identified as an Alquist-Priolo fault zone, which is an area where an active fault has the potential to cause surface rupture during an earthquake. The smaller Hathaway Creek Fault runs north and east of the City, but is not a mapped Alquist-Priolo fault zone.
Landslides occur when forces acting down-slope exceed the strength of the earth materials that compose the slope. There are multiple causes of landslides including earthquakes and rainfall.
The City of Point Arena has the potential to experience risk from landslides, primarily along the hillside locations under conditions where rock strata parallels surface slopes, high clay content absorbs excess water, displacement has fractured a fault zone, or where the bases of slopes have been removed by erosion. Liquefaction occurs when vibrations caused by earthquakes cause saturated soils to lose stability.
Geology Impact Discussion
(a.i) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving rupture of a known earthquake fault as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map, issued by the State Geologist for the area or based on other substantial evidence of a known fault? City of Point Arena Wildflower East
53 Less than Significant Impact
Fault rupture occurs when the ground surface fractures because of fault movement during an earthquake and almost generally follows preexisting fault traces, which are zones of weakness.
The Project site does not fall within the Alquist-Priolo Fault Zone and no identified active faults traverse the site. As such, there is no expectation that the site would be vulnerable to fault rupture. The nearest fault with surface rupture is the San Andreas fault. The Alquist-Priolo Zone of the San Andreas Fault is located approximately 2.5 miles north of the Project. Generally, structures intended for human occupancy are required to be placed a minimum of 50 feet from an active fault.
San Adreas Fault and Pint Arena
Landforms within the area do not indicate the presence of active faults and the risk of fault rupture at the site is low. The Project is in an area affected by strong seismic activity and future seismic shaking should be anticipated at the site. The proposed project will have to conform with current standards for earthquake-resistant construction as they are subject to the current California Building Code requirements.
The Project site is more than 4 miles from the San Andres Fault so the Project would have a less than significant impact related to risk of fault-related ground rupture during earthquakes within the limits of the site due to a known San Andres Fault Zone.
City of Point Arena Wildflower East
54 (a.ii) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving strong seismic ground shaking? Less than Significant Impact
The intensity of earthquake motion is dependent on the characteristics of the generating fault, distance to the fault and rupture zone, earthquake magnitude, earthquake duration, and sitespecific geologic conditions. The proposed Project has the potential to expose people and structures to adverse effects from strong shaking during a seismic event.
The Project will be required to comply with the latest California Building Standards Code seismic requirements. As such, the Project will result in less than significant impacts from potential impacts of ground shaking that could result in substantial adverse effects to people or structures, including the risk of loss, injury, or death. (a.iii) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving seismic-related ground failure, including liquefaction? No Impact
Point Arena’s downtown has persisted through many earthquakes and there appears to be low liquefaction risk. As such, the Project and would have a less than significant impact due to risk of loss, injury, or death involving seismic-related ground failure and liquefaction. (a.iv) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving landslides?
No Impact
The risk of landslide is dictated by several factors including precipitation conditions, soil types, steepness of slope, vegetation, seismic conditions, and level of human disturbance. When certain conditions are present, landslides can be triggered because of seismic activity. Based on the site’s relatively flat topography, the subject Project is not located in an area susceptible to landslides.
Landslide mapping made available by the California Geological Survey do not indicate largescale slope instability at the Project site, and the Geotechnical Study and Report did not observe active landslides at the site. The closest observed landslide is located at Highway 1 and Lighthouse Road.
The project site is relatively flat without major water flows and the project does not the potential to expose people to loss, injury or death as a result of a landslide. (b) Would the Project result in substantial soil erosion or the loss of topsoil? Less Than Significant Impact
City of Point Arena Wildflower East
55 The new construction components of the Project would require removal of vegetation and/or grading and trenching. These ground disturbing activities have the potential to result in soil erosion or the loss of topsoil if not properly controlled. As identified in the Air Quality section of this analysis, the project will be required to comply with dust control measures set forth by the Mendocino County Air Quality Management District during construction. Additionally, the building permit application review will ensure best management practices are in place for grading and construction activities that address erosion and sediment controls. As such, the development and operation of the Project will have a less than significant impact related to erosion and the loss of topsoil.
(c) Would the Project be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the Project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse? Less Than Significant Impact
Lateral spreading, lurching, and associated ground failure can occur during strong ground shaking on certain soil substrates typically on slopes. Lurching generally occurs along the tops of slopes where stiff soils are underlain by soft deposits or along steep channel banks whereas lateral spreading generally occurs where liquefiable deposits flow towards a “free face,” such as channel banks, during an earthquake.
As previously discussed, the Project site is relatively flat. Therefore, potential impacts related to lateral spreading, lurching, and associated ground failure would be less than significant. (d) Would the Project be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property? Less than Significant Impact
Typically, soils that exhibit expansive characteristics are found within the upper five feet of the ground surface. Over long-term exposure to wetting and drying cycles, expansive soils can experience volumetric changes. The adverse effects of expansive soils include damage to foundations, utilities and infrastructure, paved roads and streets, and concrete slabs. Expansion and contraction of soils, depending on the season and the amount of surface water infiltration, could exert enough pressure on structures to result in cracking, settlement, and uplift. The site is already heavily developed with many structures which have not experienced settling or other changes which would indicate the presence of expansive soils. Additionally, the only new construction on the site, includes small units that are similar in size to many other nearby residential units and so will have a less than significant impact related to a substantial direct or indirect risk to life or property as a result of expansive soils. Additionally, a soils report will be required as part of the Building Permit process for this project to ensure that building foundations are adequately designed for seismic safety, and Mitigation Measure GEO-1 is included for this purpose. With this Mitigation Measure the Project will have a less than significant impact.
City of Point Arena Wildflower East
56 (e) Would the Project have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater?
No Impact
The Project would connect to the existing sanitary sewer system that conveys effluent to the City’s wastewater treatment facility. There are no onsite septic tanks and no alternative wastewater treatment facilities are proposed. Therefore, there would be no impacts due to the disposal of wastewater where sanitary sewers are not available. (f) Would the Project directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
Less Than Significant with Mitigation
There is a low potential for paleontological resources to be present on the Project site.
Nevertheless, the potential remains for the discovery of buried paleontological resources.
Mitigation Measure GEO-2 will ensure that proper procedures are followed in the event of a paleontological discovery. Therefore, the Project will have a less than significant impact with mitigation related to the destruction of paleontological or geological resources.
Mitigation Measures
GEO-1: The Applicant shall submit a Soils Report with the Building Permit application for the components of the Project that require new construction. The Plan and Specifications for the foundations shall include consideration of soils in all engineering calculations per the State Building Code.
GEO-2: If paleontological resources, including individual fossils or assemblages of fossils, are encountered during construction activities all ground disturbing activities shall halt and a qualified paleontologist shall be procured to evaluate the discovery and make treatment recommendations.
h. GREENHOUSE GAS EMISSIONS
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Generate greenhouse gas emissions,
either directly or indirectly, that may
have a significant impact on the
environment?
City of Point Arena Wildflower East
57 b) Conflict with an applicable plan,
policy, or regulation adopted for the
purpose of reducing the emissions of
greenhouse gases?
Existing Greenhouse Gas Setting
Greenhouse gases (GHGs) are generated naturally from geological and biological processes as well as human activities including the combustion of fossil fuels and industrial and agricultural processes. GHGs include carbon dioxide (CO2), nitrous oxide (N2O), methane (CH3), chlorofluorocarbons, hydrofluorocarbons, and perfluorocarbons.
While GHGs are emitted locally, they have global implications. GHGs trap heat in the atmosphere, which heats up the surface of the Earth. This concept is known as global warming and is contributing to climate change. Changing climatic conditions pose several potential adverse impacts including sea level rise, increased risk of wildfires, degraded ecological systems, deteriorated public health, and decreased water supplies.
Executive Order (EO) S-3-05 provides the California Environmental Protection Agency with the regulatory authority to coordinate the State’s effort to achieve GHG reduction targets. EO S-3- 05 goes beyond AB 32 and calls for an 80 percent reduction below 1990 levels by 2050. Senate Bill 375 has also been adopted, which seeks to curb GHGs by reducing urban sprawl and limiting vehicle miles traveled.
The MCAQMD has adopted CEQA thresholds of significance for greenhouse gas emissions associated with the operation of land use projects. As identified in the thresholds adopted by the District in June 2010, a project is considered to have a less than significant impact due to GHG emissions if it:
• Emits less than 1,100 metric tons (MT) CO2e per year; or • Emits less than 4.6 MT CO2e per service population per year (residents and employees).
Greenhouse Gas Emissions Impact Discussion
(a) Would the Project generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?
Less Than Significant Impact. See discussion for B below. (b) Would the Project conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
Less than Significant Impact
City of Point Arena Wildflower East
58 Construction GHG Emissions
Construction would result in GHG emissions from heavy-duty construction equipment, worker trips, and material delivery and hauling. Construction GHG emissions are short-term and would cease upon completion of construction. Therefore, impacts from GHG emissions during construction will be less than significant with mitigation.
Operational GHG Emissions
Operational GHG emissions would occur for life of the Project from onsite lighting, heating, and cooling of buildings and structures, the treatment and transport of water and wastewater, solid waste disposal, maintenance activities, and vehicle trips associated with residents, visitors, customers, delivery vehicles, etc. The proposed project will have to comply with Calgreen and the energy efficiency requirements of Title 24. Per the Uniform Building Code all heating and cooling systems must be heat pumps and all hot water heaters must also use heat pump technology. These are the most efficient heating systems available and utilize electricity.
Additional LEDs will be used throughout the project for lighting. All electricity in Point Arean is sources for 100% green energy Sonoma Clean Power so these will have no impact on GHG production.
The City of Point Arena is not subject to a Climate Action Plan or other plan that provides prescriptive policies to reduce GHG emissions. Therefore, the Project will not conflict with any applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases, resulting in a less than significant impact.
Mitigation Measures
None required.
City of Point Arena Wildflower East
59 i. HAZARDS AND HAZARDOUS MATERIALS
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Create a significant hazard to the
public or the environment through the
routine transport, use, or disposal of
hazardous materials?
b) Create a significant hazard to the
public or the environment through
reasonably foreseeable upset and
accident conditions involving the release
of hazardous materials into the
environment
c) Emit hazardous emissions or handle
hazardous or acutely hazardous
materials, substances, or waste within
one-quarter mile of an existing or
proposed school?
d) Be located on a site which is included
on a list of hazardous materials sites
compiled pursuant to Government Code
§ 65962.5 and, as a result, would it
create a significant hazard to the public
or the environment?
e) For a Project located within an airport
land use plan or, where such a plan has
not been adopted, within two miles of a
public airport or public use airport,
would the Project result in a safety
hazard or excessive noise for people
residing or working in the Project area?
f) Impair implementation of or physically
interfere with an adopted emergency
response plan or emergency evacuation
plan?
g) Expose people or structures, either
directly or indirectly, to a significant risk
City of Point Arena Wildflower East
60 of loss, injury or death involving wildland
fires?
Existing Hazards and Hazardous Materials Setting
The California Department of Toxic Substances Control (DTSC) defines a hazardous material as:
“a substance or combination of substances that, because of its quantity, concentration or physical, chemical, or infectious characteristics, may either: 1) cause, or significantly contribute to an increase in mortality or an increase in serious, irreversible, or incapacitating illness; or 2) pose a substantial present or potential hazard to human health or the environment when improperly treated, stored, transported, disposed of, or otherwise managed.” Regulations governing the use, management, handling, transportation and disposal of hazardous waste and materials are administered by Federal, State, and local governmental agencies. Pursuant to the Planning and Zoning Law, DTSC maintains a hazardous waste and substances site list, also known as the “Cortese List.”
The Mendocino Solid Waste Management Authority (MendoRecycle) provides administrative oversight and program implementation for solid waste and recycling in Mendocino County.
MendoRecycle also directly operates the household hazardous waste facility in Ukiah. The Mendocino County Department of Environmental Health serves as the Local Enforcement Agency (LEA) for the California Integrated Waste Management Board (CIWMB), issuing permits and inspecting solid waste facilities to ensure compliance with state laws.
The Mendocino County Multi-Hazard Mitigation Plan was adopted in 2014 and serves as the local hazard mitigation plan for multiple jurisdictions within the County, including the City of Point Arena. The Plan complies with the Federal Disaster Mitigation Act of 2000 by assessing natural and human-caused hazards in the County and providing mitigation strategies to reduce risks. The Plan complements recent efforts undertaken by the City of Point Arena in the 2015 General Plan Safety Element, which expands on existing hazards in the City and provides implementation measures to reduce impacts of these hazards.
The California Department of Forestry and Fire Protection (CAL FIRE) is required by law to map areas of significant fire hazards based on fuels, terrain, weather, and other relevant factors. CAL FIRE’s Statewide and County maps (adopted November 2007) depict Fire Hazard Severity Zones (FHSZs) that are within the State Responsibility Area (SRA). The SRA is the area where the State of California is financially responsible for the prevention and suppression of wildfires. The SRA does not include lands within city boundaries or in federal ownership. The FHSZs in the SRA are further classified as having a Moderate, High, or Very High hazard severity.
In addition, CAL FIRE has prepared and transmitted recommendations for FHSZ’s in areas where local governments have financial responsibility for wildland fire protection, referred to as Local Responsibility Areas (LRAs). CAL FIRE has identified areas throughout the City of Point Arena as High and Moderate FHSZ’s.
City of Point Arena Wildflower East
61 Hazards and Hazardous Materials Impact Discussion
(a) Would the Project create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? Less than Significant Impact
(b) Would the Project create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?
Less than Significant Impact
The project would include site preparation and construction activities that would involve the temporary presence of potentially hazardous materials including, but not limited to, fuels and lubricants, paints, solvents, insulation, electrical wiring, and other construction related materials. Although these potentially hazardous materials may be present onsite during construction, the Project will be required to comply with all existing federal, state and local safety regulations governing the transportation, use, handling, storage and disposal of potentially hazardous materials. Therefore, impacts to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials would be less than significant.
(c) Would the Project emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? Less than Significant Impact
The Project site is located within one-quarter mile of Arena Union Elementary School, Pacific Community Charter School, and Point Arena High School and South Coast Continuation School, which are all located north of the site. As stated above, Project construction would include the temporary presence of potentially hazardous materials during construction. which would be properly stored and labeled. Compliance with applicable state and local regulations will ensure that potential impacts due to the proximity of schools to the subject site would be less than significant.
(d) Would the Project be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code § 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
No Impact
The California Environmental Protection Agency (CAL-EPA) annually updates the California Hazardous Waste and Substances Site List, also known as the Cortese List. The Department of Toxic Substances Control compiles a record of sites to be included on the list, which is then submitted to the CAL-EPA. EnviroStor is the DTSC’s data management system for tracking City of Point Arena Wildflower East
62 cleanup, permitting, and enforcement at hazardous waste facilities and sites with known contamination. A search of EnviroStor was performed on July 27, 2022, and showed no cleanup sites on or within close proximity to the Project site.
GeoTraker is the State Water Resources Control Board’s data management system for sites that impact or have the potential to impact water quality. A search of GeoTraker was performed on April 1, 2023, and showed a LUST (Leaking underground storage tank) on the site. The parcel with the former gas station located on it had an underground storage tank which leaked petroleum onto both parcels. The Applicant removed those underground storage tanks and cleaned and capped a well on site and received a no-further-action letter from the Water Board for the removal of the underground storage tank and the capping of the well. During the first circulation of the MND, the Water Board expressed concern that the project parcel was remediated to a commercial clean-up level, which complicates residential development on the property. Water Board staff reviewed the project plans and requested additional Mitigations to ensure that contaminated soils are capped with a concrete or asphalt cap. Staff worked with the Water Board to develop HAZ-01, HAZ-02 and HAZ-03, which together would reduce impacts to a less than significant level.
(e) For a Project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the Project result in a safety hazard or excessive noise for people residing or working in the Project area? No Impact
The Project site is not located within the boundaries of an Airport Land Use Plan, nor is it located in direct proximity to a private airstrip. The nearest airport is the Lofty Redwoods Airport (53CL) located approximately 6.4 miles southeast of the project site. Therefore, no impacts associated with airport-related hazards will result from the proposed Project. (f) Would the Project impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
No Impact
The Project is not expected to impair the implementation of, or physically interfere with an adopted emergency response plan or emergency evacuation plan. The project proposes to redevelop an encroachment onto SR1, which has been designed consistent with City and Caltrans standards.
California has developed an emergency response plan to coordinate emergency services by federal, state, and local government, including responding to hazardous materials incidents.
The State Office of Emergency Services (OES) employs a Hazardous Materials Division, which enforces multiple programs that address hazardous materials. Mendocino County Multi-Hazard Mitigation Plan serves City of Point Arena and there are no aspects of the proposed Project that City of Point Arena Wildflower East
63 would interfere with an adopted emergency or evacuation plan. Therefore, no impacts are anticipated.
(g) Would the Project expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires? Less than Significant Impact
Wildland fires are of concern particularly in expansive areas of native vegetation of brush, woodland, and grassland. The Project site is surrounded by roadways and developed land uses to the northeast and west and to open space to the south.
CALFIRE categorizes the site as a Local Responsibility Area (LRA) and does not specify a severity rating; however, it is located within close proximity of lands designated as Moderate and High Fire Hazard Severity Zones by CALFIRE. As such, the project could expose people or structures to impacts related to wildland fires.
The Project was referred to both CAL FIRE and the Redwood Coast Fire Protection District for comment. Neither entity provided comment.
The Project building permit will receive review and approval by Redwood Coast Fire Protection District prior to issuance, ensuring that the development will be consistent with local and State policies related to fire safety. Additionally, the building permit will be reviewed for consistency with applicable building codes addressing fire, such as requirements that new residences have fire suppression systems. Consistency with applicable fire safety codes will ensure impacts remain less than significant.
Mitigation Measures
HZA-01. The Applicant shall cap the proposed landscaped located between the residential structure on Parcel A and the parking lot to the south as illustrated in the site plan below. The cap shall be of non-permeable pavement such as a concrete patio.
City of Point Arena Wildflower East
64 HAZ-02. The Applicant shall submit a Soil Management Plan (SMP) approved by the Regional Water Board, prior to the start of earth moving activities, which details required precautions when doing any earthwork at this site.
HAZ-03. The Applicant shall record a Land Use Covenant (LUC) which states that the capped area, outlined below in red must be maintained as a capped area and cannot be turned into bare ground or landscaped or play areas in the future.
Patio
Cap Parking Lot Cap
City of Point Arena Wildflower East
65 j. HYDROLOGY AND WATER QUALITY
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Violate any water quality standards or
waste discharge requirements or
otherwise substantially degrade surface
or ground water quality?
b) Substantially decrease groundwater
supplies or interfere substantially with
groundwater recharge such that the
Project may impede sustainable
groundwater management of the basin?
c) Substantially alter the existing
drainage pattern of the site or area,
including through the alteration of the
course of a stream or river or through
the addition of impervious surfaces, in a
manner which would:
i. result in a substantial erosion or
siltation on- or offsite?
ii. substantially increase the rate or
amount of surface runoff in a
manner which would result in
flooding on- or offsite?
iii. create or contribute runoff water
which would exceed the capacity
of existing or planned
stormwater drainage systems or
provide substantial additional
sources of polluted runoff; or
iv. impede or redirect flood flows?
d) In flood hazard, tsunami, or seiche
zones, risk release of pollutants due to
Project inundation?
e) Conflict with or obstruct
implementation of a water quality
City of Point Arena Wildflower East
66 control plan or sustainable groundwater
management plan?
Existing Hydrology and Water Quality Setting
The City of Point Arena is located near the Garcia River Estuary and is within the Point ArenaStornetta unit of the coastal watershed between the Eel and Russian River basins. Elevations range from 0 to 250 feet. Point Arena, Moat, and Ross Creeks flow south of the site. Hathaway creek, Spanish Creek, and the Garcia river flow to the north of the site.
The Mendocino County Water Agency is a special district encompassing the entirety of the County and governed by the Mendocino County Board of Supervisors. The Water Agency is responsible for the management of water resources in the County including stormwater and groundwater management.
Surface water quality is regulated by the North Coast Regional Water Quality Control Board (RWQCB) via the Water Quality Control Plan for the North Coast (Basin Plan). The RWQCB is responsible for implementing Section 401 of the Clean Water Act through the issuance of a Clean Water Certification when development includes potential impacts to jurisdictional areas such as creeks, wetlands, or other Waters of the State.
All development at the site is subject to the RWQCB Municipal Regional Stormwater National Pollution Discharge Elimination System (NPDES) Permit, Order No. R1- 2010-0017, NPDES No.
CA0023060, which requires permitees (i.e., City of Point Arena) to use their planning authorities to include appropriate source control, site design, and stormwater treatment measures in new development and redevelopment projects to address both soluble and insoluble stormwater runoff pollutant discharges and prevent increases in runoff flows from new development and redevelopment projects. This goal is to be accomplished primarily through the implementation of low impact development (LID) techniques.
The Federal Emergency Management Agency’s (FEMA’s) flood hazard mapping program provides important guidance for the City in planning for flooding events and regulating development within identified flood hazard areas. FEMA’s National Flood Insurance Program is intended to encourage State and local governments to adopt responsible floodplain management programs and flood measures. As part of the program, FEMA defines floodplain and floodway boundaries that are shown on the Flood Insurance Rate Maps (FIRMs). As indicated in FEMA mapping, the Project site is located within flood hazard zone A.
Hydrology and Water Quality Impact Discussion
(a) Would the Project violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality? Less Than Significant Impact
City of Point Arena Wildflower East
67 (e) Would to Project conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?
Less Than Significant Impact
Construction activities have the potential to result in runoff that contains sediment and other pollutants that could degrade water quality if not properly controlled. Sources of potential pollution associated with repair of existing buildings and construction of new residential units and hardscape include fuel, grease, oil and other fluids, concrete material, sediment, and litter.
The building permit will require the utilization of best management practices and Low Impact Design measures for grading and construction activities to address water quality. The proposed project would utilize water from the City’s water supply and thus would not result in water withdrawal from the site. Additionally, the site includes a wide array of landscaped areas to increase stormwater infiltration on site and help with groundwater recharge. Finally, there is no groundwater management plan in Point Arena.
As such, the Project will have a less than significant impact with regard to degradation of surface or impacts to ground water quality or supply.
(b) Would the Project substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the Project may impede sustainable groundwater management of the basin?
Less Than Significant Impact
The Project would use Point Arena Water Works’ existing potable water supply for all onsite water needs. The project would increase water demand relative to existing water use for the largely abandoned buildings. However, in compliance with building code standards, the Project would have to use high water efficiency appliances and fixtures, which would result in a less than significant increase in water use.
Additionally, the proposed project is consistent with the General Plan designation for the site, where this type and intensity of use was considered as part of General Plan adoption. The Project will not substantially increase water use or deplete groundwater supplies nor would it interfere with groundwater recharge. Therefore, the Project would have a less than significant impact to groundwater supplies and recharge.
(c(i)-c(iv)) Would the Project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would i) result in a substantial erosion or siltation on- or offsite; ii) substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or offsite; iii) create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or City of Point Arena Wildflower East
68 provide substantial additional sources of polluted runoff; or iv) impede or redirect flood flows?
Less Than Significant Impact
Per the site-specific Biological Survey, the site has a stream on the southern portion of the parcel. No changes are proposed to the stream bed.
As illustrated in the Table below the Project would result in 42% of the site being covered in impervious surfaces and 57% of the site being covered in pervious surfaces. This is a small reduction in the overall impervious surfaces on the site. The prior development had 60% of the site covered in impervious surfaces. Therefore, the Project would result in a slight decrease in stormwater runoff from the site. Therefore, the potential impact of the Project on drainage is less than significant.
Proposed Project Square Feet %
Building Footprints 9,343 18.16%
Parking & Driveways 12,747 24.78%
Total Impervious Area 22,090 42.94%
Landscaped Areas 9,729 18.91%
Open Space 6,445 12.53%
ESHA – Protected Open Space 13,180 25.62%
Total Pervious Area 29,354 57.06%
Total 51,444 100.00%
Prior Project SF %
Prior Development Foot print 31,233 60.71%
Prior Pervious Area 20,211 39.29%
Total 51,444 100.00%
Wildflower East - Total SF of Project Components and
Impervious Surfaces Prior and Proposed
City of Point Arena Wildflower East
69 (d) In flood hazard, tsunami, or seiche zones, would the Project risk release of pollutants due to Project inundation?
No Impact
The Project site is located in the Zone A flood area, as shown on FEMA’s National Flood Hazard Layer (and the image below. Zone A is located on the southern edge of the parcel where the existing stream is located. A zone A flood area indicates that this portion of the project site has a 1% annual chance of flood inundation.
However, the Project consists of repair
and maintenance of the existing
structures which are located within the
flood plain. As this flood plain is small
there is no significant risk of significant
water velocity or quantity that could
place the Project at significant risk of
loss, injury or release of pollutants due
to water inundation.
The site is not located within an
inundation area of a levee or dam so
there is no risk of a seiche.
Per the Mendocino County Tsunami
Hazards Area Map, the site is not located within a Tsunami inundation area (see map below).
City of Point Arena Wildflower East
70 Therefore, there would be no impact associated with risks due to flooding or inundation from a levee or dam failure, or from a seiche, tsunami or mudflow.
Mitigation Measures
None required.
City of Point Arena Wildflower East
71 k. LAND USE AND PLANNING
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Physically divide an established
community?
b) Cause a significant environmental
impact due to a conflict with any land
use plan, policy, or regulation adopted
for the purpose of avoiding or mitigating
an environmental effect?
Existing Land Use and Planning Setting
Point Arena's total land area is 829 net acres (excluding public streets). This total is divided into approximately 280 assessor's parcels of various sizes accommodating a variety of rural and urban uses, including open spaces and unbuildable lands. The community has abundant open space, including under and undeveloped properties, low residential densities, and an attractive and unique rural and small-town character.
According to the 2020 U.S. Census, Point Arena's population is approximately 460 residents living in approximately 200 dwelling units. (The State Department of Finance's January 1, 1994, estimate of population was 409). The in-city growth rate is judged to be extremely modest throughout the near term, although the general market-area population (persons living within the city limits plus those living in the surrounding county territory) is likely to increase somewhat. Build-out might occur of the community but is unlikely to occur until far in the future.
The General Plan’s Land Use Map depicts the City's intentions and policies for growth, development, and land use, and for the preservation and safety of public and private properties. The permitted land-use designations shown on the Map generally echo existing patterns of land use. The main changes from the 1994 General Plan to the current Plan and Map are increases in the amount and extent of land available for multi-family residential uses.
Additionally, the "Opportunities and Constraints Maps" serves as "overlays" that depict the City's intentions and policies regarding open spaces, creeks and stream beds, riparian areas, view sheds and view corridors, conservation areas, safety and seismic safety considerations, City of Point Arena Wildflower East
72 natural habitat areas, and trails. The Maps are an "early-warning" depiction of matters that shall be attended to as part of project planning and review.
The City’s Zoning Ordinance is the implementation component of the Local Coastal Program, which sets forth the purposes and intents of zoning districts, land uses permissible within districts, and limitations on development to make densities and patterns consistent with the underlying districts. The Zoning Ordinance includes the Zoning Map, which depicts zoning districts largely consistent with the land use classifications specified in the General Plan.
The project site is currently designated Highway Commercial in both the General Plan and Zoning Map. The zoning ordinance allow all the proposed uses in the Highway Commercial zone as follows:
Principally Permitted Uses
• General retail goods and services including cafes and restaurants, delis, food • stores, convenience sales, markets, bakeries, pharmacies. • Visitor-serving facilities such as hotel, motel, inns, and hostel. • Existing dwellings and living quarters.
Conditionally Permitted Residential Uses
• Multi-family dwellings of any type or mixture
Land Use and Planning Impact Discussion
(a) Would the Project physically divide an established community? No Impact
The Project would result in a mixed-use development in the core of Point Arena’s downtown and is compatible with other development within the core. It would not divide an established community.
b) Would the Project cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?
Less than Significant Impact
The proposed Project would be generally consistent with the General Plan and other applicable land use plans and policies. As previously discussed, the project is consistent with the intents and allowable land uses within the Highway Commercial zoning district and General Plan land use Designation.
Additionally, the Project is consistent with the following relevant goals, and programs set forth in the General Plan:
City of Point Arena Wildflower East
73 Coastal Act Priority Uses (Page 2)
The Coastal Act also establishes a framework for resolving conflicts among competing uses for limited coastal lands. The following table lists land use priorities from highest to lowest, as established by the Coastal Act [Sections 30213, 30220-23 30234, 30241-43, 30250, 30253 and 30255]:
(A) Development Priorities
1. Preservation and protection of natural resources, including environmentally sensitive habitats, and prime agricultural and timber lands.
2. Coastal dependent industry and commerce (in non-environmentally sensitive habitat areas) and commercial fishing.
Coastal or water dependent public recreation.
4. Non-coastal or non-water dependent public recreation.
5. Visitor serving commercial recreational, lower cost.
6. Visitor serving commercial recreational, higher cost.
7. Private residential, general industrial or commercial development.
Opportunities (pg 8)
6. Allowing a greater proportion of residential units connected with commercial Downtown growth...in order to foster mixed uses, Downtown revitalization, a built-in demand for Downtown goods and services, and affordable housing (on now undeveloped and underdeveloped lots)
(page 17 of Coastal Element)
5. Existing, lower cost visitor-serving and recreation facilities, including overnight accommodations, shall be protected to the maximum feasible extent. Removal or conversion of existing lower cost opportunities shall be prohibited unless the use will be replaced with another offering comparable visitor serving or recreational opportunities.
6. Priority shall be given to the development of visitor-serving and commercial recreational facilities designed to enhance public opportunities for coastal recreation. On land designated for visitor-serving commercial and/or recreational facilities, priority shall be given to such use over private residential or general commercial development. New visitor serving uses shall not displace existing low-cost visitor-serving uses unless an equivalent replacement is provided.
The project is consistent with the various applicable development standards of the HWC zoning district, as follows:
Development Standards
Requirement Project Conformance
Setbacks: front, 20
feet; rear, 15 feet;
side, 10 feet.
Front for new Construction: Front 20
feet; Rear 50+ feet; side 10 feet.
Setbacks for Existing Structures:
Front: 5’, Rear 5’; side 5’.
Yes for new structures,
existing structures are legal
non- conforming and so
compliance with setback
requirements is not required.
City of Point Arena Wildflower East
74 Height 45’ New Construction: Fire storage tank
32’, Water Tower 27’, WE-5 13.9’.
Existing Buildings: WE-1, WE-2 and
WE-3 and WE-4 and WE-6 are
existing conforming.
Yes for all new Structures.
Yes for all existing structures.
Minimum lot area:
10,000 square feet.
Lot size is 51,444 SF Yes
Minimum lot width:
100 feet.
Lot A is 102 ft by 105’.
Lot B is 217’ by 242.
Yes
Yes
The project is consistent with parking requirements as described below. Sec. 5.28. B defines parking space requirements by proposed use. The table below includes all relevant off-street parking space requirements and provided spaces per proposed use. As noted in the table the project provides more parking than is required by the zoning code for every proposed use. The City of Point Arena does not require applicants not to provide more than the allowable parking, therefore the project complies with the zoning ordinance with regard to the provision of parking spaces.
Parking Requirement Calculation Provided Conforms
Single- or multiple-family One (1) space per
dwellings as a secondary use dwelling unit
located in a commercial district
4 units = 4
spaces
4 spaces Yes
2. Commercial and Public/Quasipublic Uses
Small establishments in existing No spaces
and new buildings. Any use with
a floor area less than six hundred
(600) square feet and located in a
building with not more than one (l)
other use of less than six hundred (600)
square feet.
Building W/E
6 is an
existing
building of
less than 600
SF
No Parking Yes
Hotels, motels, inns, rooming One (1) space per
houses located in a non- every one and oneresidential district half (1 1/2) sleeping units 29 beds/1.5 =
20 parking
spaces.
Provided Yes
Restaurants, bars, retail sales, One (1) space
per personal services, and all other four hundred (400) commercial, public and quasi- SF
public uses not listed floor area
2,706
SF/400= 7
spaces.
Provided
Total Spaces 29 spaces 37 spaces Yes
The Project site does not currently include Bicycle Parking and Sec. 5.28.9 requires bicycle parking.
5.28.9 Sufficient bicycle storage space, as determined by the Planning Commission, shall be provided in all parking areas of ten (10) or more spaces.
City of Point Arena Wildflower East
75 Therefore, Mitigation Measure LU -1 is required to reduce this non conformance to a less than significant impact.
Landscaping and Screening (Section 5.14)
The Project complies with the landscaping and screening requirements except for the falling requirements from the ordinance:
Requirement Mitigation Measure
5.14.C- Dense landscaping or a solid wall or
fence of a minimum height of 6 feet shall be
provided along the rear and side property
lines of any non-residential use which abuts
on a residential use; to screen any open area
used for the storage of goods, materials, or
waste from view from abutting properties
and from public right-of-way...
Mitigation Measure LU -2: Wood Fence The
applicant shall install a solid wood fence of 6
feet in height along the east property line
and around the refuse container.
5.14.E. Perimeter landscaping shall be
provided between parking spaces and
adjacent street right-of-way whenever 5 or
more parking spaces are required. Such
landscaping area shall be at least 4 feet wide
and protected from damage by a curb or
header adjacent to the parking area. In
addition, whenever 5 or more parking spaces
are required 1 tree shall be provided, with an
additional tree required for every 10
additional required parking spaces. Such
trees shall be planted in tree wells at least 4
feet by 4 feet, protected by a curb or header.
When ever 5 or more parking spaces are
required, at least 4 percent of the parking
area, including the above required
landscaping, shall be landscaped.
The requirements of the code have been
addressed in the landscaping plan with the
exception of trees. For example, perimeter
landscaping is provided between parking
spaces and adjoining public sidewalks, as the
code requires.
BIO-6c requires a new landscaping plan with
at least 14 trees which exceeds this tree
requirement for parking (3 trees), therefore
Mitigation Measure BIO-6c will reduce this
impact to less than significant.
City of Point Arena Wildflower East
76 Site Development & Architectural Review Sec 5.15
The proposed Project will comply with the requirements of Site Development and Architectural Review as follows:
Relevant Requirements Compliance & Mitigation
C1. New development shall be sited and
designed to minimize adverse impacts on
scenic areas from scenic roads or public
viewing areas to the maximum feasible
extent. If there is no feasible building site
location on the proposed project site where
development would not be visible, then the
development shall be sited and designed to
minimize impacts on scenic areas from scenic
highways or public viewing areas, through
measures including, but not limited to, siting
development in the least visible portion of
the site, breaking up the mass of new
structures, designing structures to blend into
the natural hillside setting, restricting the
building maximum size, reducing maximum
height standards, clustering development,
minimizing grading, incorporating landscape
elements, and where appropriate, berming.
The Project includes removal of an “existing
structure” (already removed without benefit
of a CDP) that was one solid building and
replacing it with five smaller buildings that
are dispersed and located further from
Highway 1. The remainder of the project
consists of pre-existing structures which will
be remodeled and landscaped in a manner
which will eliminate the existing visual
impacts from the jumbled and abandoned
buildings. The impacts are less than
significant and no mitigation is required.
D3. Materials and colors used in construction
shall be selected for compatibility both with
the structural system of the building and with
the appearance of the building's natural and
man-made surroundings. Preset architectural
styles (e.g., standard fast food restaurant
designs) shall be avoided.
This will be finalized through the Staff report
on this project with Special Conditions as
required.
D4. Plant materials should be used to
integrate the man-made and natural
environments, to screen or soften the visual
impact of new development, and to provide
diversity in developed areas. Attractive
vegetation common to the area shall be
used, and native vegetation shall be used to
the maximum extent practicable. Invasive
plant species that tend to supplant native
species and natural habitats shall be
prohibited. Landscaping for MR, C, HW, and I
The applicant’s landscaping plan does not
include a plant list and so Mitigation Measure
LU-3 is required to ensure conformance with
this section of the code.
MM LU-3: Landscaping Plan. The applicant
shall submit a Landscaping Plan for approval
by the City Planner, prior to approval of the
Building Permit which includes: 14 trees, at
least 50% native plant cover and no
potentially invasive species. The landscaping
City of Point Arena Wildflower East
77 zones shall conform with the provisions of
Section 5.14.
shall provide 90 percent coverage within five
years.
D5. On-premise signs should be designed as
an integral part of the structure and should
complement or enhance the appearance of
the surrounding area.
The applicant has not submitted a signage
plan for the project.
D8. When reviewing the design of
commercial or residential buildings, the
Planning Commission shall ensure that the
scale, bulk, orientation, architectural
character of the structure and related
improvements are compatible with the rural,
uncrowded, rustic, unsophisticated, small,
casual, open character of the community. In
particular, residences of more than 2,000
square feet in floor area and multiple-family
dwellings or commercial buildings of more
than 4,000 square feet in floor area shall be
considered out of scale with the community
unless they are designed and situated in such
a way that their bulk is not obtrusive.
Residential and commercial developments
involving multiple dwelling or business units
should utilize clusters of smaller structures
with sufficient open space between them
instead of a consolidated structure.
The project complies with this requirement
as no single building is greater than 4,000 SF.
Additionally, the project includes small
clusters of buildings, with landscaped areas
and parking located between the buildings as
required.
D11. Developments shall be planned to
avoid removing trees, if feasible. At least two
trees shall be planted for every one removed
to accommodate development facilitated by
the General Plan. Visually attractive native
trees species, such as bishop pine and
sargent cypress, shall be the preferred
species used, as they require less water,
herbicides, pesticides, and are valuable to
wildlife resources.
As noted in the Biological Section of this
MND, the project includes removal of
existing tree. Mitigation Measure LU-3 will
result in compliance with this policy.
D17.Where feasible, long continuous
retaining walls shall be broken into sections
or shall include undulations to provide visual
relief. Where feasible, retaining walls
supporting a structure should be
incorporated into the foundation system in a
stepped or split level design. Retaining walls
Two concrete retaining walls are proposed
for Parcel A which would be visible from the
public right of way. Mitigation Measure LU-4
would reduce the visual impacts of such walls
to a less than significant level.
City of Point Arena Wildflower East
78 visible from scenic highways, trails, parks,
and beaches should incorporate veneers,
texturing and/or colors that blend with the
surrounding earth materials or landscape.
LU-4: The Building Permit application shall
illustrate veneers, texturing and/or colors for
the retaining walls that blend with the
surrounding earth materials or landscape, as
directed by the City Council.
D20. Land divisions, including lot line
adjustments, adjustments, shall be designed
to minimize impacts to visual resources by:
a. Clustering the building sites to
minimize site disturbance and
maximize open space.
b. Prohibiting building sites on
ridgelines.
c. Minimizing the length of access roads
and driveways.
d. Using shared driveways to access
development on adjacent lots, where
feasible.
e. Reducing the maximum allowable
density in steeply sloping and visually
sensitive areas.
f. Minimizing grading and alteration of
natural landforms
g. Landscaping or revegetating all cut
and fill slopes, and other disturbed
areas at the completion of grading
h. Incorporating interim seeding of
graded building pad areas, if any, with
native plants unless construction of
approved structures commences
within 30 days of the completion of
grading.
The proposed project complies with the
following requirements: a, c, d, f, g.
The following aspects of D20 are not relevant
to the project: b, e, h.
The proposed Lot Line Adjustment complies
with this policy.
Planning Permits
Finally, the Project requires City approval of three discretionary permits—a Coastal Development Permit (since the project meets the Coastal Act definition of “development” within the California Coastal Zone), a Use Permit (to permit the two dwelling units on each parcel, as required by Highway Commercial zoning), and a lot line adjustment. For approval of these permits, the City Council must make required findings that the Project is consistent with applicable land use plans and policies. The Council may impose conditions of approval on the Project in order to ensure consistency with these policies. The project would not be inconsistent with policies or plans to have a significant impact on the environment.
City of Point Arena Wildflower East
79 Land Use Conflicts
The Project site is adjacent to existing and principally permitted commercial and residential land uses. The Project site is also adjacent to the SR1, which could place sensitive receptors nearby the existing infrastructure.
As described previously, the area is surrounded by commercial development. Given the existing surrounding development, the redevelopment of the inn, housing units, restaurants and new lodging units would represent a compatible use of the property with surrounding uses. As such, the proposed Project would have a less than significant impact related to inconsistencies with Point Arena’s land use plans, policies, or regulations adopted for the purpose of avoiding or mitigating an environmental effect.
Mitigation Measures
LU-1 Bicycle Parking. The applicant shall submit a site plan that includes bicycle parking of at least four spaces.
LU-2: Wood Fence. The applicant shall install a solid wood fence of 6 feet in height along the east property line and around the refuse container.
LU-3: Landscaping Plan. The applicant shall submit a Landscaping Plan for approval by the City Planner, prior to approval of the Building Permit which includes: 14 trees, at least 50% native plant cover and no potentially invasive species. The landscaping shall provide 90 percent coverage within five years.
LU-4: Retaining Wall Veneers. The Building Permit application shall illustrate veneers for the retaining walls that blend with the surrounding earth materials or landscape, as directed by the City Council.
City of Point Arena Wildflower East
80 l. MINERAL RESOURCES
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Result in the loss of availability of a
known mineral resource that would be a
value to the region and the residents of
the state?
b) Result in the loss of availability of a
locally important mineral resource
recovery site delineated on a local
general plan, specific plan or other land
use plan?
Existing Mineral Resources Setting
The California Surface Mining and Reclamation Act of 1975 (SMARA) identifies mineral resources within California and requires classification of mineral resources based on their relative value for extraction. A variety of mineral resources, including aggregate resource minerals and hard rock quarries are known to exist in Mendocino County. According to the Division of Mine Reclamation, California Department of Conservation and the United States Geological Survey, Mineral Resources Data System, there are no mineral resources within the City of Point Arena nor in or around the Project site.
Mineral Resources Impact Discussion
(a) Would the Project result in the loss of availability of a known mineral resource that would be a value to the region and the residents of the state, (b) Would the Project result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? No Impact
There are no known mineral resources within the City of Point Arena nor does the City identify locally important mineral resources in the General Plan. Therefore, the proposed Project would have no impact regarding the loss of availability of mineral resources.
Mitigation Measures
None required.
City of Point Arena Wildflower East
81 m. NOISE
Would the Project result in:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Generation of a substantial temporary
or permanent increase in ambient noise
levels in the vicinity of the Project in
excess of standards established in the
local general plan or noise ordinance, or
applicable standards of other agencies?
b) Generation of excessive groundborne
vibration or groundborne noise levels?
c) For a Project located within the
vicinity of a private airstrip or an airport
land use plan or, where such a plan has
not been adopted, within two miles of a
public airport or public use airport,
would the Project expose people
residing or working in the Project area to
excessive noise levels?
Existing Noise Setting
The Point Arena General Plan Noise Element provides a framework for evaluating sound in the community, both qualitatively and quantitatively, and sets forth noise reduction or noise suppression policies and programs. This is done by describing the current local environment of sounds, identifying and measuring local noise sources, identifying and mapping noise-sensitive land uses, projecting future noise levels, and prescribing policies and programs for achieving the city's noise-control goals.
Sources that contribute to the ambient noise levels within Point Arena include vehicular traffic, aircraft, industrial activities, and mechanical equipment including refrigeration units, heating and cooling, and ventilation. Commercial and general industrial land uses are typically considered the least noise-sensitive, whereas residences, schools, and hospitals are the most noise- sensitive. Other features of the soundscape include storm surf, and the toll of the offshore bell buoy. The Noise Element includes goals, policies, and programs aimed at maintaining low ambient noise levels.
City of Point Arena Wildflower East
82 The Project site is bounded by established commercial land uses. Primary noise sources that contribute to the ambient noise environment at the Project site include vehicles driving on highway 1, and noise associated with business uses.
Noise Impact Discussion
(a) Would the Project result in generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the Project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Less Than Significant Impact with Mitigation
The proposed Project would generate noise on a temporary basis during construction activities and on an ongoing basis upon occupancy.
Construction Noise
Construction would result in temporary and intermittent noise onsite and in the Project vicinity from the use of construction equipment. Construction noise would be perceptible to established uses in the immediate vicinity, specifically nearby existing residences and commercial uses.
Noise impacts resulting from construction at the site will depend upon the noise generated by various pieces of construction equipment, the timing and duration of noise- generating activities, and the distance between construction noise sources and noise-sensitive areas.
Construction noise impacts primarily result when construction activities occur during noisesensitive times of the day (e.g., early morning, evening, or nighttime hours), the construction occurs in areas immediately adjoining noise-sensitive land uses, or when construction occurs over extended periods of time. During each stage of construction, there would be a different mix of equipment operating, and noise levels would vary based on the amount of equipment in operation and the location at which the equipment is operating.
Section 9.35.040 of the Point Arena Municipal Code outlines provisions associated with noise, and states that “Noise levels shall not be permitted to exceed 60 Leq anywhere within the City of Point Arena.” Leq is an equivalent continuous noise level, which is calculated by determining the sound level in decibels for specific sounds during the day and applying those frequencies over the time period in which these sounds occur. According to the Occupational Safety and Health Administration (OSHA), common noisy equipment used at a construction site can vary in noise level. A backhoe is measured at approx. 85 decibels, a nail gun at 97 decibels, and a bulldozer at around 100 decibels.
The type of equipment to be used at the site during construction is unknown at this time.
Mitigation Measure NOI-1 is added to require that equipment generating noise above 60 decibels (the sound of a normal conversation) must occur between the hours of 7 a.m. and 8 City of Point Arena Wildflower East
83 p.m., and that any equipment used that exceeds 85 decibels, such as a nail gun or bulldozer, be limited to weekdays between the hours of 8 a.m. and 5 p.m. As a result of mitigation, impacts related to construction noise will be less than significant.
Operational Noise
Project operation would contribute to the ambient noise environment from the introduction of parking, outdoor areas, people talking and vehicles traveling to and from the site. The Project site is in an area that contains many similar established commercial uses downtown, including hotel, restaurant, retail and residential uses. The proposed mixed-use project is compatible with these existing uses and would be compatible with existing ambient noise levels that are already generated by these similar uses. As such, the Project will have less than significant impacts.
(b) Would the Project result in generation of excessive groundborne vibration or groundborne noise levels?
Less Than Significant Impact
Vibration from operation of heavy equipment can result in effects ranging from annoyance of people to damage of structures. Varying geology and distance results in different vibration levels containing different frequencies and displacements. In all cases, vibration amplitudes decrease with increasing distance from the source. Perceptible ground‐borne vibration is generally limited to areas within a few hundred feet of construction activities. As seismic waves travel outward from a vibration source, they excite the particles of rock and soil through which they pass and cause them to oscillate. The rate or velocity (in inches per second) at which these particles move is the commonly accepted descriptor of the vibration amplitude, referred to as the peak particle velocity (PPV).
Caltrans establishes significance criteria for potential damage to structures as well as human perception. Groundborne vibration of 0.3 in/sec PPV is established for older residential structures and 0.5 in/sec PPV for newer residential structures. Groundborne vibration is considered barely perceptible to humans at 0.01 in/sec PPV and severe at 0.4 in/sec PPV.
Development of the site would include construction activities that may generate perceptible vibration during use of heavy equipment or impact tools. Construction equipment including vibratory rollers, bulldozers, caisson drills, loaded trucks, and jackhammers generate vibration levels ranging from 0.003 in/sec PPV to 0.2 in/sec PPV at a distance of 25 feet.
Based on the significance criteria established by Caltrans and the typical groundborne vibration generated by construction equipment, the Project would not generate excessive groundborne vibration or noise in excess of 0.3 in/sec PPV at existing off-site uses. Therefore, the Project would not expose people or structures to excessive groundborne vibration and impacts from groundborne vibration and noise would be less than significant.
City of Point Arena Wildflower East
84 (c) For a Project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the Project expose people residing or working in the Project area to excessive noise levels?
Less than Significant Impact
The Project site is not located within the boundaries of an Airport Land Use Plan, nor is it located in direct proximity to a private airstrip. The nearest airport is Lofty Redwoods Airport (53CL), located approximately 5 miles southeast of the Project site. Though noise from aircrafts flying overhead would be perceptible at the Project site, people residing or working in the Project area would not be exposed to excessive noise levels associated with such noise and therefore impacts would be less than significant.
Mitigation Measures
NOI-1: During construction of the project, noise above 60 decibels must occur only between the hours of 7 a.m. and 8 p.m. Any equipment used that exceeds a noise level of 86 decibels, such as a nail gun or bulldozer, shall be limited to weekdays between 8 a.m. and 5 p.m.
n. POPULATION AND HOUSING
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Induce substantial unplanned
population growth in an area, either
directly (for example, by proposing new
homes and businesses) or indirectly (for
example, through extension of roads or
other infrastructure)?
b) Displace substantial numbers of
existing people or housing, necessitating
the construction of replacement housing
elsewhere?
Existing Population and Housing Setting
The City of Point Arena is a small jurisdiction, encompassing approximately 1.4 square miles, located along the coast in southern Mendocino County. According to the U.S. Census, in 2020 City of Point Arena Wildflower East
85 the population of Point Arena was 460 residents. The City’s population has remained relatively stable, with 449 residents in 2010, and 472 residents in 2017. Compared with other cities, Point Arena has seen a larger growth rate within the county and Mendocino County as a whole. With the exception of Fort Bragg, Point Arena is well above the overall growth trend of Mendocino County and surrounding cities—most of which have seen an increase of less than 10% since 1990.
The Housing Element includes numerous goals, policies, and programs aimed at promoting housing unit construction (with emphasis on low-income households) and preserving the existing housing stock (particularly rental units).
Population and Housing Impact Discussion
(a) Would the Project induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
No Impact
The proposed Project is consistent with the property’s General Plan land use designation (HWC) and Zoning District (HWC). Both adopted documents anticipated and permit the proposed pattern and density of development.
The project would access SR1 and would not require the development of roadways or utilities.
The relatively modest growth that would result from this Project would include four residential units and a limited number of jobs (9 employees/day), and both are planned for in the General Plan and Zoning Ordinance, and there would be no resulting impacts related to population growth.
(b) Would the Project displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere? No Impact
A project would be considered to have a significant environmental effect if it displaces a large number of people or induces substantial growth or concentration of population. The Project would do neither. The Project site is currently developed with vacant and underutilized buildings. The Project would not displace existing housing units or people, it would rehabilitate one existing housing unit into two housing units and result in the renovation of two housing units in the old Seaside Hotel. Therfore the Project would have no impacts to population and housing regarding displacing people or existing housing.
Mitigation Measures
None required.
City of Point Arena Wildflower East
86 o. PUBLIC SERVICES
Would the Project result in substantial
adverse physical impacts associated
with the provision of new or physically
altered governmental facilities, need
for new or physically altered
governmental facilities, the
construction of which could cause
significant environmental impacts, in
order to maintain acceptable service
ratios, response times or other
performance objectives for any of the
public services:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Fire protection?
b) Police protection?
c) Schools?
d) Parks?
e) Other public facilities?
Existing Public Services Setting
The City of Point Arena receives police protection services from the Mendocino County Sheriff’s Department. Fire protection and emergency medical services are provided by the Redwood Coast Fire Protection District. The fire station is located at 19601 CA-1 in Manchester.
The Point Arena Schools District is one of ten Common Districts in the State, with a separate elementary school district (Arena Union Elementary School District) and high school district (Point Arena Joint Union High School District), with a common district office, superintendent, board of trustees and budget. Point Arena High School serves students from northern Sonoma County and southern Mendocino County, and as far inland as the Kashia Rancheria. Arena Union Elementary School serves students from Gualala to Manchester. The district also includes the Pacific Community Charter School, South Coast Continuation High School, the independent study program, K-8 After School Program and State Preschool.
City of Point Arena Wildflower East
87 The Point Arena Public Works Department is responsible for the management and maintenance of the City’s recreation facilities. The General Plan identifies Downtown Park and Harper Park as the City’s park facilities, with plans to develop a park at Arena Cove and east of downtown.
Bureau of Land Management maintains the Point Arena-Stornetta Unit along and beyond the north end of the City, providing eight miles of marked paths and substantial open space opportunities for Point Arena residents and guests. Though the City does not control this land, it is anticipated to remain.
Public Services Impact Discussion
(a-e) Would the Project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the listed public services? Less Than Significant Impact
The Project site is well served by existing public services. The Project would increase the need for services from Fire and Police Departments, schools, and parks. However, the increase would represent a minimal change that would not trigger the need for an expansion of services, an increase in staffing, or otherwise adversely affect public services. Increasing demands on public services have been anticipated as part of General Plan, which anticipated this level of commercial use of the Project site.
The Project includes 4 residential units, which may bring new residents to Point Arena, including school-aged children. Though the Project would increase enrollment of nearby public schools, it is not anticipated to exceed existing capacity of these facilities. Furthermore, new residential developments are subject to school fees, which fund necessary improvements and offset any potential impacts of introducing new students to the area. Therefore, the Project is expected to have a less than significant impact on public schools.
The Project will not generate a substantial increase in demand that would warrant the expansion or construction of new public facilities, including parks within the vicinity of the Project site. Impacts to parks will likewise have a less than significant impact.
Mitigation Measures
None required.
City of Point Arena Wildflower East
88 p. RECREATION
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Increase the use of existing
neighborhood and regional parks or
other recreational facilities such that
substantial physical deterioration of the
facility would occur or be accelerated?
b) Include recreational facilities or
require the construction or expansion of
recreational facilities which might have
an adverse physical effect on the
environment?
Existing Recreation Setting
Point Arena and the surrounding area offers several active and passive outdoor recreational amenities including parks, trails, and ocean recreation options at Arena Cove. The Bureau of Land Management operates the Point Arena-Stornetta Public Lands north of the City.
Recreation Impact Discussion
(a) Would the Project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?
Less Than Significant Impact
See analysis below.
(b) Would the Project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? Less Than Significant Impact
The Project will increase the number of visitors and residents who would utilize existing parks and recreation facilities within the City. Existing facilities would be adequate to meet recreational demands of Project residents and customers. Therefore, impacts related to the increased use, deterioration, construction or expansion of recreational facilities are expected to be less than significant as a result of the proposed Project.
Mitigation Measures
None required.
City of Point Arena Wildflower East
89 q. TRANSPORTATION
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Conflict with a program, plan,
ordinance or policy addressing the
circulation system, including transit,
roadway, bicycle and pedestrian
facilities?
b) Conflict or be inconsistent with CEQA
Guidelines § 15064.3, subdivision (b)?
c) Substantially increase hazards due to
a geometric design feature (e.g., sharp
curves or dangerous intersections) or
incompatible uses (e.g., farm
equipment)?
d) Result in inadequate emergency
access?
Existing Transportation and Impact Setting
The Point Arena General Plan establishes goals, policies, and implementation measures that seek to maintain an integrated transportation network that provides for safe and convenient multi-modal travel. The transportation network within the City includes roadways, buses, bikeways, and sidewalks. Roadways consist of the following street types.
Arterial Streets: Designed to move traffic efficiently primarily serve the Project site. Property access is deemphasized, whereas traffic movement is emphasized. In Point Arena, only SR1 functions as an arterial. In the downtown, SR1 functions equally as a collector as it assumes the role of Main Street.
On-street parking is provided along SR1. On-street parking is also permitted along Mill Street, parts of Lake Street (near the elementary school), and sections of School Street and Riverside Avenue/Eureka Hill Road. Several businesses along SR1 have off-street parking areas for their patrons.
City of Point Arena Wildflower East
90 The General Plan identifies alternative modes of transportation as an important aspect of the circulation network, providing multiple benefits including a reduction in traffic, improved air quality, and reduced noise levels. SR1 is designated as part of the Pacific Coast Bike State Route, a Class III facility running most of the length of SR1 in California. The City also maintains bike lanes on Port Road between Iversen Avenue and the coast.
The Community Action Plan was adopted in 2010 and makes recommendations for a wide range of transportation and circulation improvements. The Plan includes a proposed “School Trail” between Lake Street and School Street to provide additional access for students through property across from Harper’s Cut-Off Trail. This would be a mid-block crosswalk and pedestrian island, with an easement on the private properties between School Street and Lake Street for pedestrian access.
Public transportation in the City is provided by Mendocino Transit Authority (MTA). Route 95 makes one daily round trip from Santa Rosa to Point Arena, and Route 75 makes one daily round trip from Ukiah to Gualala.
Vehicle Miles Traveled Discussion
Level of service (LOS), which is used to describe vehicle delay, has historically been used to measure traffic service within the City of Point Arena. The General Plan establishes that new development shall not cause collector streets to degrade to a lower level of service than their existing capacity, beyond which would be considered to have a significant impact to the circulation network. Pursuant to SB 743, the Office of Planning and Research (OPR) was charged with identifying an alternative metric to LOS for evaluating environmental impacts from transportation. In December 2018 the OPR released the Technical Advisory on Evaluating Transportation Impacts in CEQA, which provides technical recommendation regarding assessment of vehicle miles traveled (VMT), as an alternate to LOS, thresholds of significance for VMTs, and mitigation measures.
CEQA Guidelines section 15064.3 subdivision (b) describes specific considerations for evaluating a project’s transportation impact using a VMT metric. This metric refers to the amount and distance of automobile travel attributable to a project.
In June 2022 the Mendocino Council of Governments (MCOG), approved a Regional Baseline Study that analyzes existing traffic conditions in the region to establish a baseline standard from which to determine significance thresholds for future land use projects, and develop technical tools and procedures for evaluating VMT impacts of development projects. The Fehr & Peers study summarizes available VMT data for Mendocino County, discusses alternative measurement methods and thresholds, recommends VMT methods and thresholds for lead agencies, and provides Transportation Demand Management (TDM) strategies for reducing VMT generated by the project.
City of Point Arena Wildflower East
91 Transportation Impact Discussion
(a) Would the Project conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities? Less Than Significant Impact with Mitigation
Construction
Construction would result in vehicle trips by construction workers and haul-truck trips for material off-haul and deliveries via SR1. Construction-related traffic would be temporary, would vary daily, and would be distributed over the course of a workday and work week. The number of construction-related vehicles traveling to and from the Project Area would vary on a daily basis. As required by Mitigation Measure NOI-1, construction hours would generally be limited.
Due to the infrequency of truck traffic and the temporary nature of construction, Project construction is not anticipated to conflict with plans, policies or programs related to the effectiveness of the circulation system.
Operation
Once complete, the proposed Project would increase vehicle traffic on SR-1 and local streets.
The Project is proposed on lands designated for this scale of development, consistent with nearby commercial development patterns. The operational effects of the Project on the transportation network are consistent with the planned uses for the area.
Alternative Modes of Transportation
Public transit, bicycle, and pedestrian facilities in the Project vicinity will not be substantially impacted by The Project. The Project may increase ridership to the public transit system, if guests decide to take the bus from Santa Rosa to visit Point Arena. The Mendocino County Transit system currently has sufficient capacity and facilities to support increased ridership generated by the proposed Project. Therefore, impacts to public transit would be less than significant.
Summary
The Project would not conflict with an applicable plan, ordinance, or policy and would have less than significant impacts to the circulation system.
(b) Would the Project conflict or be inconsistent with CEQA Guidelines 15064.3, subdivision (b)?
Less Than Significant Impact
As previously discussed, lead agencies are required to evaluate a Project’s potential impacts using a VMT metric as of July 1, 2020. California’s Office of Planning and Research (OPR) issued a Technical Advisory on Evaluating Transportation Impacts in CEQA. The advisory establishes screening thresholds for projects and includes an assumption that projects that generate or City of Point Arena Wildflower East
92 attract fewer than 110 trips per day may be assumed to cause a less than significant impact, absent substantial evidence otherwise. Additionally, the guidance notes that:
“In rural areas of non-MPO counties (i.e., areas not near established or incorporated cities or towns), fewer options may be available for reducing VMT, and significance thresholds may be best determined on a case-by-case basis. Note, however, that clustered small towns and small-town main streets may have substantial VMT benefits compared to isolated rural development, similar to the transit oriented development described above.”
The proposed Project would be located on a rural small town’s Main Street and so the project may have substantial VMT benefits relative to hotels located out of the downtown.
The proposed Project includes:
• The re-establishment of an inn with 20 rooms, a restaurant and four residential units.
These uses will not increase VMT, as they are preexisting uses. • The conversion of a small 826 retail space to a small restaurant and the new construction of 5 units of lodging. These uses will increase VMT and should be considered in the MND.
• The demolition of a 3,880± square foot lodging building that had 16 rooms would reduce VMT to the site.
This volume of new visitors to the small restaurant and five new lodging units would likely exceed 110 trips per day VMT threshold. However, this increase would be offset by the decrease in VMT due to the demolition of 16 lodging units.
Per Fehr and Peers statewide VMT model (VMT+ | Providing VMT Per Capita Estimates Across California), Point Arena has the following existing VMT profile for VMT. • Average Residential VMT is 15.3 VMT/day, so with four 2-bedroom units, this would result in a VMT of 15.3 X 3 people/unit X 4 units = 183 VMT/day. • Average Employee VMT is 8.6 VMT/day, so with 9 employees average/day this would result in VMT of 8.6 X 9 = 77.4 VMT/day
• There is not existing average VMT for restaurant guests. The VMT would be calculated by assuming that a guest might consider another comparable restaurant in Point Arean, and the VMT would be trivial as all competing restaurants are within a half-mile radius. • There is no existing average VMT for hotel visitors. Hotel VMT is calculated by determining the estimated VMT to the proposed Project compared to other potential destinations. Fort Bragg is the most likely competitive hotel market for visitors from the Bay Area and Sacramento, while Gualala is the most competitive hotel market for visitors from Sonoma County. As illustrated in the table the demolition of the 3,880 SF hotel building will reduce vehicle miles traveled by much more (-1,012 VMT/day) than the addition of the five new lodging units (+255 VMT/day). Additionally, the demolition of the 16 hotel rooms more than compensates for the tiny difference in VMT between Point Arena and a comparable hotel development in Gualala (+25/VMT).
City of Point Arena Wildflower East
93 • Additionally, the demolition of the hotel building would result is a net decrease in VMT even after including the increase due to the additional project residences and employes, e.g. -1012 VMT for the demolition of the hotel building + 183 VMT for the four new residential Units, +77.4 VMT for the 9 new employees, +255 VMT for the five new lodging units = -497 VMT/day.
With the guidance provided by OPR’s advisory report and Caltrans, and the analysis above the Project would have a less than significant impact related to VMT. (c) Would the Project substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? Less Than Significant Impact
The Project was referred to Caltrans for comment and review for consistency with their requirements. Caltrans reviewed the Project and they requested that the commercial drive way be a minimum of 25 ft but no wider than 35 feet in width. The Project applicant has proposed a driveway of 28 feet in width, which is closer to the preferred minimum recommended by Caltrans. Additionally, the Project fronts SR1 which provides 16-foot sidewalks along the parcel frontage which exceeds Caltran’s preferred minimum sidewalk width of 6-foot wide for sidewalks.
Caltrans also noted that if the driveway is relocated from its current location, the drive would need to be built to state standards and the installation of a driveway would require approval of an encroachment permit, which would ensure consistency with City policies regulating driveway approaches in the right-of-way. As a result, impacts related to geometric design would be less than significant.
(d) Would the Project result in inadequate emergency access? Comparative Vehicle Miles Traveled for Wildflower East
Guest Home Area
% of
Guests
Point
Arena
Fort
Bragg Gualala
San Fransisco 50% 129 171 115
Sacramento 25% 170 189 158
Santa Rosa 25% 81 110 71
Estimated VMT from 5
new Hotel Rooms * 255 321 230
Estimated reduction in
VMT from demolition of
16 lodging units*
(1,018) (1,282) (918)
Source: MJC, 2024; Gooogle Maps, 2024
* Assumes 50% annual occupancy and each room is booked for only one night.
City of Point Arena Wildflower East
94 Less Than Significant Impact
Project construction will allow for sufficient emergency access during construction and the site layout will allow effective emergency access during operation. Road closures would not be anticipated, although temporary encroachment would occur during any frontage improvements along SR1, which would require an approved Encroachment Permit from Caltrans. All roads would be expected to remain accessible during temporary construction activities and would not substantially impair emergency access.
Internal circulation was reviewed for adequacy by the Redwood Coast Fire Protection District, which did not respond with requested modifications. The site design includes driveway access through the site from SR1 to Mill Street, which would provide access for emergency vehicles to all components of the project. Therefore, impacts to emergency vehicle access would be less than significant.
Mitigation Measures
None.
r. TRIBAL CULTURAL RESOURCES
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Would the Project cause a substantial
adverse change in the significance of a
tribal cultural resource defined in Public
Resources Code section 21074 as either a
site, feature, place, cultural landscape
that is geographically defined in terms of
the size and scope of the landscape,
sacred place, or object with cultural value
to a California Native American tribe, and
that is:
i. Listed or eligible for listing in the
California Register of Historical
Resources, or in a local register of
historical resources as defined in
Public Resources Code section
5020.1(k), or
ii. A resource determined by the lead
City of Point Arena Wildflower East
95 agency, in its discretion and
supported by substantial evidence,
to be significant pursuant to criteria
set forth in subdivision (c) of Public
Resources Code Section 5024.1. In
applying the criteria set forth in
subdivision (c) of Public Resource
Code Section 5024.1, the lead
agency shall consider the
significance of the resource to a
California Native American tribe.
Existing Tribal Cultural Resources Setting
Tribal Cultural Resources are defined as sites, features, places, cultural landscapes, sacred places, or objects that have cultural value to a California Native American tribe that are either included or determined to be eligible for inclusion in the California Register of Historical Resource (CRHR) or are included in a local register of historical resources. Additionally, a lead agency may identify a significant resource at its discretion and supported by substantial evidence, considering the significance of the resource to a California Native American tribe.
William Rich, M.A. of WRA, archaeologist, prepared an Archaeological Report for the Project.
The reports include copies of letters sent to tribes inviting consultation on the proposed Project. Pursuant to the AB 52 consultation process, the City of Point Arena sent letters to the Manchester-Point Arena Rancheria on August 29 2023, informing them of the proposed Project and providing an opportunity to request consultation. No responses requesting consultation were received by the City.
Tribal Cultural Resources Impact Discussion
6.18(a.i) Would the Project cause a substantial adverse change in the significance of a tribal cultural resource defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k)? No Impact
As stated above, surveys of the Project site did not find evidence of suggesting the site is eligible for listing as a Historical Resource. Therefore, the Project would have no impact on a tribal cultural resource that is listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k).
City of Point Arena Wildflower East
96 6.18(a.i) Would the Project cause a substantial adverse change in the significance of a tribal cultural resource defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe?
Less than Significant Impact with Mitigation
As previously stated, the City of Point Arena sent formal notification to Native American Tribes traditionally and culturally affiliated with the area. Though no consultation was requested, an Archaeological Report and follow-up investigation has been prepared with mitigation measures to reduce potential impacts to significant cultural and tribal cultural resources. Implementation of the previously described Mitigation Measure CUL-1 requires compliance with procedures set forth in the Archaeological Report and follow-up investigation. As such, the proposed Project, will have a less than significant impact with mitigation to tribal cultural resources.
Mitigation Measures
See Mitigation Measure CUL-1.
s. UTILITIES AND SERVICE SYSTEMS
Would the Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Require or result in the relocation or
construction of new or expanded water,
wastewater treatment or storm water
drainage, electric power, natural gas, or
telecommunications facilities, the
construction or relocation of which
could cause significant environmental
effects?
b) Have sufficient water supplies
available to serve the Project and
reasonably foreseeable future
City of Point Arena Wildflower East
97 development during normal, dry, and
multiple dry years?
c) Result in a determination by the
wastewater treatment provider which
serves or may serve the Project that it
has adequate capacity to serve the
Project’s projected demand in addition
to the provider’s existing commitments?
d) Generate solid waste in excess of
State or local standards, or in excess of
the capacity of local infrastructure, or
otherwise impair the attainment of solid
waste reduction goals?
e) Comply with federal, state, and local
management and reduction statutes and
regulations related to solid waste?
Existing Utilities and Service Systems Setting
Water
The Point Arena Water Works (PAWW), a privately-owned utility under California Public Utility Commission oversight, supplies water to most of Point Arena. The exceptions are users who have individual wells. The major source of water is a well adjacent to the Garcia River. The main storage tank is just east of downtown. It was estimated in 2006 that the system produces 33,000 gallons per day and delivers water to approximately 179 homes and businesses.
Existing water permits allow the PAWW to pump 0.22 cubic feet per second (142,000 gallons per day) or a maximum of 100-acre feet per year (90,000 gallons per day). Existing water storage can hold 575,000 gallons. Under the current water permits, a maximum of 1,385 people may be served (90,000 gallons per day maximum at 65 gallons per person). An emergency contingency plan is lacking in the advent of loss of water at its source or within the system due to a natural disaster, particularly seismic activity at the river or seismic activity in the vicinity of any water lines or storage tanks. Water quality is regulated by the State Department of Health Services, which conducts regular inspections to ensure continuing water quality.
Wastewater
The City's sewage collection and disposal system is owned and operated by the City of Point Arena. Sewer lines serve most of the existing developed area. The treatment includes aerated pond treatment, and chlorination, and percolation and evaporation for disposal. Areas not served are accommodated by individual septic tank systems.
City of Point Arena Wildflower East
98 A wastewater system capacity analysis was completed in January of 1996 by Bonneau Dickson, P.E. This study used buildout figures from density and zoning allowed by the City’s General Plan, and it determined that the City of Point Arena wastewater system has adequate capacity to handle and treat the highest foreseeable flows and biochemical oxygen demand (BOD) loads that will be generated under the current General Plan.
The average flows to the system, which in 2006 were just under 30,000 gallons per day (GPD) in dry weather, but the capacity of the system is limited not by the average flows but by the peak flows, which are occasionally 20 to 30 times higher than the average dry weather flows. The capacity of the sewer system is determined by the peak instantaneous flow that it will pass and will become inadequate only when there is an overflow from the system. The sewer system has never been known to overflow due to a lack of hydraulic capacity. It may increase very little as new connections are made to the sewer system because the system may already be leaking at the maximum rate possible.
Solid Waste
Recology hauls solid waste and recyclable materials in the City of Point Arena to a permitted collection site, and would be available for the Project.
Utilities and Service Systems Impact Discussion
(a) Would the Project require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects?
Less Than Significant Impact
(c) Would the Project result in a determination by the wastewater treatment provider which serves or may serve the Project that it has adequate capacity to serve the Project’s projected demand in addition to the provider’s existing commitments? Less Than Significant Impact
The missed-use Project has been anticipated by the General Plan zoning for the Project site, and would not be expected to necessitate the expansion or construction of water or wastewater treatment facilities. As previously stated, the City’s existing water supply and wastewater treatment capacity is adequate to supply the Project given current zoning. Therefore, impacts related to the relocation, construction, or expansion of water and wastewater facilities would be less than significant.
The project will connect to current storm drain infrastructure and the total square footage of impervious surfaces will decrease as a consequence of the project. Furthermore, the development includes LID standards to minimize runoff from impervious surfaces (trees, City of Point Arena Wildflower East
99 landscaping, etc. Therefore, impacts related to the relocation, construction, or expansion of existing storm drain facilities would be less than significant.
6.19(b) Would the Project have sufficient water supplies available to serve the Project and reasonably foreseeable future development during normal, dry, and multiple dry years? Less Than Significant Impact
The Project will utilize water obtained from the existing PAWW system to meet onsite water demands. Potable water would be accommodated via the installation of new water laterals for the five new buildings and use of existing laterals for the existing buildings. The increase in onsite water demand resulting from the redevelopment of the site has been anticipated in the General Plan. Therefore, impacts due to insufficient water supplies or inadequate entitlements would be less than significant.
(d) Would the Project generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals?
Less Than Significant Impact
See below.
(e) Would the Project comply with federal, state, and local management and reduction statutes and regulations related to solid waste?
Less Than Significant Impact
Project redevelopment will contribute to the generation of solid waste within the City.
However, as the project is relatively small the disposal of solid waste resulting from the Project would be less than significant.
Mitigation Measures
None required.
t. WILDFIRE
If located in or near state responsibility
areas or lands classified as very high
fire hazard severity zones, would the
Project:
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Substantially impair an adopted
emergency response plan or emergency
evacuation plan?
City of Point Arena Wildflower East
100
b) Due to slope, prevailing winds, and
other factors, exacerbate wildfire risks,
and thereby expose Project occupants to
pollutant concentrations from a wildfire
or the uncontrolled spread of a wildfire?
c) Require the installation or
maintenance of associated
infrastructure (such as roads, fuel
breaks, emergency water sources,
power lines or other utilities) that may
exacerbate fire risk or that may result in
temporary or ongoing impacts to the
environment?
d) Expose people or structures to
significant risks, including downslope or
downstream flooding or landslides, as a
result of runoff, post-fire slope
instability, or drainage changes?
Existing Wildfire Setting
Mendocino County is highly susceptible to fire hazards due to natural and man-made causes.
Dry conditions and high winds along with human encroachment into the wildland-urban interface (WUI) presents increasing risk to human life and structures.
In July 2018, the Mendocino Complex Fire, which was comprised of the Ranch and River fires, burned approximately 458,900 acres near Lakeport, Ukiah, and areas within the Mendocino National Forest. Residents of Point Arena were exposed to the secondary effects of the wildfire, such as smoke and air pollution. Smoke generated by wildfire consists of visible and invisible emissions that contain particulate matter (soot, tar, water vapor, and minerals) and gases (carbon monoxide, carbon dioxide, nitrogen oxides). Public health impacts associated with wildfire include difficulty in breathing, odor, and reduction in visibility.
Wildfire Impact Discussion
(a) Would the Project substantially impair an adopted emergency response plan or emergency evacuation plan?
Less Than Significant Impact
The Project site is categorized as a Local Responsibility Area by CAL FIRE. Though the site is located within close proximity to land designated as Moderate Fire Hazard Severity Zone, there are no lands designated as Very High Fire Hazard Severity within five miles of the Project site.
The Project will be required to comply with all fire safety standards of the building code and will City of Point Arena Wildflower East
101
be reviewed by the Redwood Coast Fire Protection District. The project is not expected to substantially impair an adopted emergency response plan or emergency evacuation plan. As such, impacts of the Project would be less than significant.
6.20(b-d) Would the Project substantially impair an adopted emergency response plan or emergency evacuation plan?
Less Than Significant Impact
The Project site is relatively flat and is adjacent to existing commercial and residential development. There are no factors, such as steep slopes, prevailing winds, or the installation/maintenance of new infrastructure, that would exacerbate fire risk or expose occupants of the Project to the uncontrolled spread of a wildfire, pollutant concentrations from a wildfire, post-fire slope instability, or post-fire flooding. Therefore, impacts would be less than significant.
Mitigation Measures
None required.
u. MANDATORY FINDINGS OF SIGNIFICANCE
Potentially
Significant
Impact
Potentially
Significant
Impact
Unless
Mitigation
Incorporated
LessThanSignificant
Impact
No
Impact
a) Does the Project have the potential to
substantially degrade the quality of the
environment, substantially reduce the
habitat of a fish or wildlife species, cause
a fish or wildlife population to drop
below self-sustaining levels, threaten to
eliminate a plant or animal community,
substantially reduce the number or
restrict the range of a rare or
endangered plant or animal or eliminate
important examples of the major
periods of California history or
prehistory?
b) Does the Project have impacts that
are individually limited, but cumulatively
considerable (“Cumulatively
City of Point Arena Wildflower East
102
considerable” means that the
incremental effects of a Project are
considerable when viewed in connection
with the effects of past projects, the
effects of other current projects, and the
effects of probable future projects)?
c) Does the Project have environmental
effects, which will cause substantial
adverse effects on human beings, either
directly or indirectly?
Findings Discussion
(a) Does the Project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self- sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory?
Less Than Significant Impact
The Project is in Point Arena’s downtown core and potential impacts associated with the Project have been anticipated by the City’s General Plan and analyzed in the General Plan EIR.
As conditioned and mitigated, the proposed Project is consistent with the goals of the General Plan and the zoning ordinance. As mitigated the proposed would not adversely impact sensitive habitat, riparian areas, nor would the Project result in significant impacts to special-status plant or wildlife species. With implementation of mitigation measures contained herein, as well as adherence to the City’s uniformly applied development standards, the impacts of the Project to the quality of the environment would be reduced to levels below significance. As such, the Project will not degrade the quality of the environment, reduce habitat, or adversely affect cultural resources.
(b) Does the Project have impacts that are individually limited, but cumulatively considerable (“Cumulatively considerable” means that the incremental effects of a Project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? Less Than Significant Impact
The CEQA Guidelines defines cumulative impacts as “two or more individual effects which, when considered together, are considerable or which compound or increase other environmental impacts. The individual effects may be changes resulting from a single project or increase in environmental impacts. The cumulative impact from several projects is the change in the environment which results from the incremental impact of the proposed Project when City of Point Arena Wildflower East
103
added to other closely related past, present, and reasonably foreseeable probable future projects. Cumulative impacts can result from individually minor but collectively significant projects taking place over a period of time” (Guidelines, Section 15355(a)(b)).
This Initial Study evaluates cumulative impacts using the General Plan EIR. Development of the proposed Project, in combination with past, present, and future development in the City could result in long-term impacts to air quality, traffic, and noise. Cumulative long-term impacts from development within the City were identified and analyzed in the City’s General Plan EIR.
The proposed Project is within the City’s long-range plan for future development. The Project will contribute to cumulative impacts identified in the City’s General Plan EIR but not to a level that is cumulatively considerable. As described in Sections 7.1 – 7.20 of this document, the Project could potentially result in significant impacts; however, those impacts would be reduced to less than significant levels with implementation of mitigation measures. The implementation of mitigation measures would ensure that development of the proposed Project would not be cumulatively considerable.
(c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? Less Than Significant Impact
The Project has the potential to result in adverse impacts to humans due to air quality, hazards and hazardous materials, geology and soils, noise, and transportation. However, implementation of mitigation measures contained herein will ensure that the Project will have less than significant environmental effect that would directly or indirectly impact human beings onsite or in the Project vicinity.
Wildflower East MMRP 1
Wildflower East MMRP
MITIGATION AND MONITORING REPORTING PROGRAM
MMRP Statements:
1. MMRP runs with the Land. The adopted Wildflower East MND and MMRP shall run with the real property and
successive owners, heirs, and assigns of this real property are bound to comply with all of the requirements of the adopted program;
2. MMRP Disclosure. Prior to any lease, sale, transfer, or conveyance of any portion of the Project Site, the applicant shall provide a copy of the adopted program to the
prospective lessee, buyer, transferee, or one to whom the conveyance is made;
3. Applicant Responsibilities. Wildflower East is responsible for ensuring the attached MMRP is implemented and that
annual reports are submitted to the City of Point Arena describing compliance and work towards compliance with
all mitigation measures.
4. Professional Expertise. The following professional expertise is required for completion or evaluation of any part of the program: Biologist.
5. Payments. No additional costs are required of the
applicant.
6. Civil Remedies and Criminal Penalties. The following civil remedies and criminal penalties are permitted by
Title18.04.050 of CEQA for noncompliance with this
adopted mitigation monitoring and reporting program.
18.04.120 Civil and administrative remedies.
In addition to the penalties set forth in subsection 18.04.100, the city may carry out or seek other remedies as permitted by law, including, but not limited to the following:
A. Injunctive relief;
B. A stop order subject to the following:
1. Whenever the environmental coordinator finds that there is noncompliance with an adopted program and that this noncompliance presents a serious and immediate threat to the public health, safety and welfare, the environmental coordinator shall issue a stop work order which shall prohibit further work on the project that is the subject of the adopted program.
2. In the event the environmental coordinator issues a stop work order, notice of this order shall be served on the applicant and/or project supervisor and/or contractor and posted on site. The notice shall contain the following:
a. The findings justifying the stop work order;
b. The time and date when the stop work order commence; c. The time, date, and place at which the applicant may appear to respond to the findings in the notice, which shall not be later than twenty-four (24) hours following the time and date when the stop work order commences.
3. Authority to recommence work on the project that is the subject of an adopted program after issuance of a stop work order may be granted by the environmental coordinator upon the establishment of such terms, conditions and requirements as are reasonably necessary to protect the public health, safety, and welfare and as are consistent with the terms, conditions, and requirements of the adopted program. (Ord. 97-03 § 2 (part): prior code § 8-1.6015(L))
Wildflower East MMRP 2
Mitigation Monitoring and Reporting Program
Mitigation Monitoring Reporting
Mitigation Measure Schedule Responsibility Procedure Comments Date/Initial
AESTHETICS
AES-1: Prior to issuance of a building permit for
this Project, the applicant shall submit an exterior
lighting plan showing the location of all exterior
lights and the manufacturer and type of lighting
fixtures proposed. Lights and light fixtures shall be
downcast and shielded to prevent offsite light
trespass. The exterior lighting plan shall be
reviewed and approved by the City in conjunction
with building permit review.
Prior to
issuance of
Building
Permit
Applicant Submit exterior Lighting
Plan
Air Quality
AQ-1: The Project comply with the following
mitigation measures set forth by the Mendocino
County Air Quality Management District to control
fugitive dust generated during construction
activities:
1. All visibly dry disturbed soil and road
surfaces shall be watered to minimize
fugitive dust emissions.
2. Earth or other material tracked onto
neighboring paved roads shall be removed
promptly.
3. Approved chemical soil stabilizers shall be
applied to exposed earth surfaces in inactive
construction areas and exposed stockpiles
(i.e., sand, gravel, dirt).
4. Dust generating activities shall be limited
during periods of high winds (over 15 mph).
5. Access of unauthorized vehicles onto the
construction site during non-working hours
shall be prevented.
6. A daily log shall be kept of fugitive dust
control activities.
During all
Operations
City of Point
Arena
Wildflower East.
Stop construction if
mitigations and not
implemented.
Implement Mitigation
Measures
Wildflower East MMRP 3
AQ-2: The Project shall comply with Regulation 4,
Rule 4.1-400 of the MCAQMD related to
prohibitions on woodburning, including the
following:
1. 4.1-400(a) No person shall install an open
wood burning fireplace in any new
residential, commercial, or public building or
accessory building, or as part of a renovation
of any residential, commercial, or public
building or accessory building.
2. 4.1-400(b) No person shall install a woodfired outdoor boiler to provide heat for any residential, commercial, or public building or
accessory building.
3. 4.1-400(c) No person shall install wood
burning appliances in any new, remodeled or
renovated multi- family residence,
commercial or public building or accessory
building, except as a replacement for an
existing wood burning appliance.
During all
Operations
Wildflower East. Follow requirements.
Wildflower East MMRP 4
Mitigation Monitoring Reporting
Mitigation Measure Schedule Responsibility Procedure Comments Date/Initial
BIOLOGY
BIO-1a: The riparian buffer shall be enhanced through
plantings of native shrubs and management of invasive
species. A plant palette of suitable native species is
included in Table 2 below. The area of enhancement
shall be a 25-foot-wide strip adjacent to the Project Area within the undeveloped 50-foot riparian buffer. The
intention of the planting is to create a minimum fifty (50) percent absolute cover of the 25-foot-wide buffer with
native shrubs once plants reach maturity.
Implementation of plantings/irrigation/management
should be overseen by landscape professionals with
experience planting and maintaining native species.
Invasive species shall include any Cal-IPC ‘High’ plants and will not include grass species. Management of
invasive species shall be conducted for three (3) years.
Invasive species observed, or which may occur in the
Study Area, and should be target species that are
managed are included in Table 3.
During
Construction
After
Construction
Applicant &
Landscaping
Contractor
Applicant
Implement Mitigation
Implement Mitigation
Table 2. Native Planting Palette
Common Name Scientific Name
Wax myrtle Morella californica
California blackberry Rubus ursinus
Coyote bush Baccharis pilularis
California coffeeberry Frangula californica ssp. californica Sword fern Polystichum munitum
Red elderberry Sambucus racemosa
Oso berry Oemleria cerasiformis
Silk tassel Garrya elliptica
Table 3. Target Invasive Species
Common Name Scientific Name
English Ivy Hedera helix
Cape ivy Delairea odorata
Himalayan blackberry Rubus armeniacus
Pampas grass Cortaderia spp.
Periwinkle Vinca major
Sources for locally sourced native plantings includes Jughandle Farm Nursery, Mendocino Coast Botanical Gardens, Samara Restoration.
Control of invasive grass species is highly challenging, and that level of restoration is determined not necessary for this project due to existing conditions and proposed Project.
Wildflower East MMRP 5
BIO-1b: Only native plant species shall be included in
landscaping within the 100-foot riparian buffer. Construction Wildflower East &
Landscaping
Contractor
Prior to final of Building
Permit
BIO-2a: Land disturbance activities will occur during the general dry season June 1 through October 15. Erosion
control measures (i.e., weed-free, jutes straw waddle,
weed-free straw bales, silt fencing, tarps) shall be staged on-site prior or at initiation of land disturbance activities in case rain-event may occur.
BIO-2b: If a rain event in excess of 0.25-inch over a 24- hour period occurs during the construction phase, all
activities shall cease for 24 hours after perceptible rain ceases. Erosion control measures (e.g., weed-free straw waddle, weed-free straw bales, cover bare soil) shall be deployed in the event of unseasonable rains.
BIO-2c: Spill prevention materials shall be on-site for all materials and equipment; all construction personnel shall stop work and deploy spill prevention materials in the
event of escaping petrol, oil, solvents, paints, etc. No equipment or other materials which may cause pollution
to the riparian/stream shall be stored or staged within the 100-foot riparian buffer.
BIO-2d: To minimize soil and vegetation disturbance
within the buffer, temporary fencing shall be placed at the edge of land disturbance activities and outside the 50- foot buffer. No land disturbance or material/equipment
staging shall occur outside the fencing and construction staff will be informed of the purpose of the fencing.
Fencing shall be removed upon completion of the Project.
Construction
Construction
Construction
Construction
Contractor
Contractor
Contractor
Contractor
Construction
Crew
Implement Mitigation
Implement Mitigation
Implement Mitigation
Implement Mitigation
Wildflower East MMRP 6
BIO-3a: Use of the scaffolding within riparian vegetation shall be limited to the minimum amount necessary to
complete necessary improvements. Scaffolding shall be
installed and removed with the fewest people possible
and shall remain in place for the shortest duration
feasible.
BIO-3b: Scaffolding shall be installed and used in riparian vegetation at the driest portion of the dry season, as
feasible. Natural wooden boards (i.e., not treated) shall be laid down along the access path to scaffolding within riparian vegetation.
BIO-3c: Construction netting shall be installed to capture any debris which may fall from the structures or
scaffolding. Appropriate equipment and methods for any
potential pollutant materials (i.e., paint, etc.) which are to be applied to the structures shall be used in a manner
which will reduce drift, leaking or spillage. Any debris which may fall on the ground shall be removed by the end of the workday.
BIO-3d: No herbaceous riparian vegetation shall be
removed, and no woody riparian vegetation shall be
limbed or otherwise removed.
Construction
Construction
Construction
Construction
Contractor
Construction
Crew
Contractor
Construction
Crew
Contractor
Construction
Crew
Contractor
Construction
Crew
Implement Mitigation
Implement Mitigation
Implement Mitigation
Implement Mitigation
Wildflower East MMRP 7
BIO-4a: All land disturbance of undeveloped land,
including woody vegetation removal, shall occur during
the dry season (June 1 through October 15) when specialstatus wildlife species are less likely to be dispersing.
BIO-4b: A qualified biologist shall conduct a preconstruction survey no more than 24 hours prior to initiation of land disturbance. The biologist shall inspect gopher holes and any other potential upland refugia
where CRLF or WPT may occur. If CRLF is found, the
qualified biologist shall follow instructions outlined on the USFWS Technical Assistance Letter (Appendix F). If WPT is found, the qualified biologist shall consult with CDFW.
BIO-4c: A biological education program shall be provided by a qualified biologist to all personnel that will be
present at the site during ground disturbance and related activities. Following worker education, each construction work member present is anticipated to have the
information needed to identify each species and be relied upon to follow measures should a CRLF or WPT be
observed. The worker education program shall include
information regarding the identification and natural
history of each species (including photographs), the
potential for occurrence of each species within work
areas, protocols to be followed for daily surveys, the legal status and the ramifications for take, the purpose of the exclusion fencing and importance of maintaining it, and specific measures being implemented to avoid impacts to each species. Contact information for USFWS staff and
Project biologist shall be provided during the training.
BIO-4d: Trained workers shall conduct daily surveys for CRLF in the Project Area prior to daily work. If CRLF is observed in the course of pre-construction or daily
surveys or during work, all ground disturbance shall halt and USFWS and Project biologist shall be notified
immediately. The CRLF shall be addressed as outlined in the USFWS Technical Memo (bullet point 3).
Construction
Construction
Construction
Construction
Contractor
Biologist
Biologist &
Contractor &
Construction
Crew
Construction
Crew
Implement Mitigation
Implement Mitigation
Implement Mitigation
Implement Mitigation
Wildflower East MMRP 8
BIO-4e: If WPT is observed in the course of construction activities, all ground disturbance shall halt, and the
Project biologist shall be notified immediately.
Construction activities shall resume once the WPT has
exited the area of active construction and is out of harm’s way.
BIO-4f: All ground disturbing activities shall cease for 24 hours following a rainfall event where 0.25- inches or
greater of precipitation within a 24-hour period was
predicted for the Point Arena area.
BIO-4g: Symbolic fencing and signs shall be installed
following completion of the Project to discourage human or pet entry into the buffer, riparian vegetation, and
stream.
BIO-4h: All CRLF conditions outlined in the USFWS
Technical Assistance Letter shall be observed.
Construction
Construction
Construction
Construction
Biologist
Construction
Crew
Contractor &
Construction
Crew
Construction
Crew
Construction
Crew
Implement Mitigation
Implement Mitigation
Implement Mitigation
Implement Mitigation
BIO-5a: Tree/vegetation removal and initial ground
disturbance shall occur from August 16 to January 31,
outside of the general bird nesting season. If
tree/vegetation removal during this time is not feasible, a pre-construction nesting bird survey should be performed by a qualified biologist no more than 7 days prior to the initiation of tree removal or ground disturbance. The
survey should cover the Project Area and surrounding
areas within 100 feet. If active bird nests are found during the survey, an appropriate no- disturbance buffer should be established by the qualified biologist. Once it is
determined that the young have fledged (left the nest) or the nest otherwise becomes inactive (e.g., due to
predation), the buffer may be lifted, and work may be
initiated within the buffer. If land disturbance or
vegetation removal ceases for longer than 14 days,
another nesting survey should be conducted prior to
beginning such activities (if within nesting bird season), as nests may have been established during the time of no
PreconstructionContractor &
Biologist
Bird Survey
Implement Mitigation
Wildflower East MMRP 9
activity.
BIO-6a: The applicant shall submit a revised site plan that does not include the proposed Windmill and the proposed windmill shall not be constructed as part of this project.
BIO-6b: That applicant shall submit a Building Permit for this project which does not include construction of the retaining wall along the southern edge of Building W/E 1 and Building W/E 2.
BIO-6c: Prior to issuance of the building Permit, the
applicant shall submit a landscaping plan that illustrates at least 14 native California trees. The trees shall be planted prior to approval of the building permit final.
Prior to
Building
Permit
Submittal
Prior to
Building
Permit
Submittal
Prior to
Building
Permit
Submittal
Applicant & City
of Point Arena
Applicant & City
of Point Arena
Applicant & City
of Point Arena
Revise Site Plan
Revise Site Plan
Submit Revised
Landscaping Plan
BIO-7a: No construction related debris will be staged
within the 50-foot buffer, or in areas where such debris may wash into the creek. Any refueling of equipment
should also occur outside of the 100-foot riparian buffer.
BIO-7b: Under no circumstances should any wash water or wastewater from construction be allowed to enter Arena
Creek.
BIO-7C: Construction netting or tarps should be installed beneath scaffolding along the creek to capture any debris which may fall from the structures or scaffolding,
preventing it from entering Arena Creek. Appropriate
equipment for the application of materials (i.e., paint, etc.) which is to be applied to the structures should be used.
The manner in which materials are applied should be the least likely to cause drift, leaking or spillage. Any debris which may fall on the ground should be removed by the
end of the workday.
BIO-7d: Land disturbance activities will occur during the general dry season June 1 through October 15. Erosion
control measures (i.e., weed-free jutes straw waddle,
weed-free straw bales, silt fencing, tarps) should be staged Construction
Construction
Construction
Construction
Contractor &
Crew
Contractor &
Crew
Contractor &
Crew
Contractor &
Crew
Implement Mitigation
Implement Mitigation
Implement Mitigation
Implement Mitigation
Wildflower East MMRP 10
and installed on-site prior or at initiation of land
disturbance activities in case rain-event may occur.
CULTURAL RESOURCES
CUL-1: If cultural or historic resources are
encountered during construction activities, all onsite
work shall cease in the immediate area and within a
50-foot buffer of the discovery location. A qualified
archaeologist will be retained to evaluate and assess
the significance of the discovery, and develop and
implement an avoidance or mitigation plan, as
appropriate. For discoveries known or likely to be
associated with Native American heritage (precontact
sites and select historic period sites), the tribal
representatives listed in the Archaeological Report
Section 6.2 shall be contacted immediately to
evaluate the discovery and, in consultation with the
project proponent, the County, and consulting
archaeologist, develop a treatment plan in any
instance where significant impacts cannot be avoided.
During
Construction Contractor & City
of Point Arena.
Tribal Officer
Verify compliance with
Mitigation Measure
CUL-1.
CUL 2 - In the event that human remains are
encountered, all work must stop in the immediate
vicinity of the discovered remains and the Mendocino
County Medical Examiner, the Sheriff-Coroner, and a
qualified archaeologist must be notified immediately
to evaluate the remains. If the remains are deemed to
be Native American and prehistoric, the Native
American Heritage Commission must be contacted by
the Coroner so that a “Most Likely Descendant” can
be designated and further recommendations
regarding treatment of the remains can be provided.
During
Construction
Contractor & City
of Point Arena.
Tribal Officer
Halt construction if
unidentified resources
are found. Implement
Mitigation Measure
CUL-2.
Wildflower East MMRP 11
GEOLOGY & SOILS
Mitigation Monitoring Reporting
Mitigation Measure Schedule Responsibility Procedure Comments Date/Initial GEC-3: The Applicant shall submit a Soils Report with
the Building Permit application for the components of
the Project that require new construction. The Plan
and Specifications for the foundations shall include
consideration of soils in all engineering calculations
per the State Building Code.
Prior to
Building
Permit
Building
Department and
Wildflower East
Implement Mitigation
Measure
GEO-2: If paleontological resources, including
individual fossils or assemblages of fossils, are
encountered during construction activities all ground
disturbing activities shall halt and a qualified
paleontologist shall be procured to evaluate the
discovery and make treatment recommendations.
Construction City of Point
Arena
Paleontologist
Implement mitigation
measure if a discovery is
made.
Mitigation Monitoring Reporting
Mitigation Measure Schedule Responsibility Procedure Comments Date/Initial
HAZARDS AND HAZARDOUS MATERIALS
HAZ -1: The Applicant shall cap the proposed
landscaped area located between the residential
structure on Parcel A and the parking lot to the
south as illustrated in the site plan below. The cap
shall be of non-permeable pavement such as a
concrete patio.
Prior to
Construction
Architect Revise Site Plan and
Building Permit to include
Caped Patio
HAZ-2: The Applicant shall submit a Soil
Management Plan (SMP) approved by the Regional
Water Board, prior to the start of earth moving
activities, which details required precautions when
doing any earthwork at this site.
HAZ-3: The Applicant shall record a Land Use
Covenant (LUC) which states that the capped area,
outlined below in red must be maintained as a
capped area and cannot be turned into bare ground
or landscaped or play areas in the future.
Prior to
Construction
Prior to
Construction
Applicant,
Architect and Civil
Engineer
Applicant
Implement Mitigation
Measure
Implement Mitigation
Measure
Wildflower East MMRP 12
LAND USE AND PLANNING
Mitigation Monitoring Reporting
Mitigation Measure Schedule Responsibility Procedure Comments Date/Initial LU-1: Bicycle Parking. The applicant shall submit
a site plan that includes bicycle parking of at least
four spaces.
LU-2: Wood Fence. The applicant shall install a
solid wood fence of 6 feet in height along the east
property line and around the refuse container.
LU-3: Landscaping Plan. The applicant shall
submit a Landscaping Plan for approval by the City
Planner, prior to approval of the Building Permit
which includes: 14 trees, at least 50% native plant
cover and no potentially invasive species. The
landscaping shall provide 90 percent coverage
within five years.
LU-4: Retaining Wall Veneers. The Building
Permit application shall illustrate veneers for the
retaining walls that blend with the surrounding
earth materials or landscape, as directed by the
City Council.
Prior to
Construction
Construction
Prior to
Construction
Construction
Applicant
Contractor
Landscape
Architect
Contractor
Implement Mitigation
Measure
Implement Mitigation
Measure
Implement Mitigation
Measure
Implement Mitigation
Measure
Mitigation Monitoring Reporting
Mitigation Measure Schedule Responsibility Procedure Comments Date/Initial NOISE
NOI-1: Noise. During construction of the project,
noise above 60 decibels must occur only between
the hours of 7 a.m. and 8 p.m. Any equipment
used that exceeds a noise level of 86 decibels,
such as a nail gun or bulldozer, shall be limited to
weekdays between 8 a.m. and 5 p.m.
Construction Applicant &
Contractor
Implement Mitigation
Measure
WRA #31421
November 2022
ENVIRONMENTALLY SENSITIVE HABITAT AREA (ESHA) SURVEY
135 MAIN STREET
CITY OF POINT ARENA, MENDOCINO COUNTY, CALIFORNIA
Prepared for: Prepared by:
Jeff Hansen
P.O. Box 669
Point Arena, CA
WRA, Inc.
5341 Old Redwood Highway
Petaluma, CA 95442
Attn: Rhiannon Korhummel
[email protected]
[Page left intentionally blank]
i
EXECUTIVE SUMMARY
This report details the regulatory background, methods, results, and recommendations of an Environmentally Sensitive Habitat Area (ESHA) assessment for the proposed Project at the 135 Main Street in City of Point Arena, Mendocino County, California (Study Area).
Previous biological assessments, including special-status plant survey, special-status wildlife assessment, Point Arena Mountain Beaver (Aplodontia rufa nigra; PAMB) surveys, U.S. Fish and Wildlife Service (USFWS) consultation for PAMB, and land cover identification were conducted by SHN, Inc. biologists in 2017. No special-status plants or wildlife were detected, including PAMB.
ESHA land cover was not identified. USFWS biologist Greg Schmidt conducted PAMB surveys within the Study Area and vicinity in May 2022 and did not detect occupation of potential habitat by PAMB.
This report is to document existing conditions of the Study Area. WRA, Inc. performed field survey on April 23 and June 5, 2022. The Study Area is composed of developed areas, non-native grassland, riparian vegetation and perennial stream (Arena Creek). No special-status plants were observed within the Study Area during the site visits.
Point Arena Mountain Beaver, California red-legged frog (Rana draytonii; CRLF), one specialstatus reptile, as well as non-status birds with baseline legal protections, were determined to have the potential to occur in the Study Area. Based on presence/absence surveys of potential habitat within 100 feet of the Study Area, PAMB is presumed absent; however, the remaining species are presumed present.
Development is proposed to occur within 100-feet of ESHA. A buffer analysis for ESHA and PAMB is included in this report. Through incorporation of mitigation measures, the Project is determined to not have a significant impact on ESHA and is anticipated to allow for the continuance of ESHA located in the Study Area.
ii
TABLE OF CONTENTS
1.0 INTRODUCTION....................................................................................................................... 1
2.0 REGULATORY BACKGROUND.................................................................................................. 1
2.1 Federal and State Regulatory Setting ................................................................................ 1
2.1.1 Sensitive Land Cover Types......................................................................................... 1
2.1.2 Special-status Species................................................................................................. 3
2.2 City of Point Arena Regulatory Setting .............................................................................. 4
2.2.1 Local Coastal Plan (Section X of the Local Use Plan) ...................................................... 4
2.2.2 City of Point Arena Municipal Code ............................................................................... 5
3.0 ENVIRONMENTAL SETTING .................................................................................................... 7
3.1 Topography and Soils......................................................................................................... 7
3.2 Climate and Hydrology....................................................................................................... 8
3.3 Land Cover and Land Use................................................................................................... 8
4.0 ASSESSMENT METHODS ......................................................................................................... 8
4.1 Land Cover Types ............................................................................................................... 9
4.1.1 Terrestrial Land Cover Types ...................................................................................... 9
4.1.2 Aquatic Resources..................................................................................................... 10
4.2 Special-status Species ...................................................................................................... 11
4.2.1 General Assessment.................................................................................................. 11
4.2.2 Special-status Plants ................................................................................................. 11
4.2.3 Special-status Wildlife............................................................................................... 12
4.2.4 Critical Habitat, Essential Fish Habitat, and Wildlife Corridors................................. 12
5.0 ASSESSMENT RESULTS.......................................................................................................... 12
5.1 Land Cover Types ............................................................................................................. 12
5.1.1 Terrestrial Land Cover Types .................................................................................... 12 ESHA........................................................................................................................ 12 Non-ESHA ................................................................................................................ 13
5.1.2 Aquatic Resources..................................................................................................... 13
5.2 Special-status Species ...................................................................................................... 13
5.2.1 Special-status Plant Species...................................................................................... 13
5.2.2 Special-status Wildlife Species.................................................................................. 14
5.2.3 Critical Habitat, Essential Fish Habitat, and Wildlife Corridors................................. 16
6.0 PROJECT ANALYSIS AND RECOMMENDATIONS ................................................................... 17
6.1 Land Cover Types ............................................................................................................. 23
6.1.1 Terrestrial Land Cover Types .................................................................................... 23
6.1.2 Aquatic Resources..................................................................................................... 26
6.2 Special-status Species ...................................................................................................... 26
6.2.1 Special-status Plants ................................................................................................. 26
6.2.2 Special-status Wildlife............................................................................................... 26
6.2.3 Wildlife Movement ................................................................................................... 27
7.0 REFERENCES.......................................................................................................................... 29 iii
LIST OF TABLES
Table 1. ESHA and Point Arena Mountain Beaver Buffer Development Criteria Analysis City of Point Arena Municipal Code 18.25.220 and 18.25.240........................................................................... 18 Table 2. Native Planting Palette..................................................................................................... 24 Table 3. Target Invasive Species..................................................................................................... 24
LIST OF APPENDICES
Appendix A – Figures
Appendix B – Species Observed in the Study Area
Appendix C – Potential for Special-status Species to Occur in the Study Area Appendix D – Representative Photographs
Appendix E – Statement of Qualifications
Appendix F – USFWS Letter of Consultation
Appendix G – SHN Biological Resources Assessment Letter
LIST OF PREPARERS
Matt Richmond – Principal-in-Charge
Rhiannon Korhummel – Biologist
Michael Rochelle – GIS Analyst
DEFINITIONS
Study Area: The area throughout which the assessment was performed, inclusive of the entire
1.25-acre parcel and buffer; the area evaluated for potential impacts to ESHA.
Project Area: The area encompassing the proposed development area. iv
LIST OF ABBREVIATIONS & ACRONYMS
BIOS Biogeographic Information and Observation System
BMP Best Management Practice
Cal-IPC California Invasive Plant Council
Caltrans California Department of Transportation
CCA California Coastal Act
CCC California Coastal Commission
CCH California Consortium of Herbaria
CCR California Code of Regulations
CDFG California Department of Fish and Game (now CDFW)
CDFW California Department of Fish and Wildlife
CESA California Endangered Species Act
CEQA California Environmental Quality Act
CFGC California Fish and Game Code
CFR Code of Federal Regulations
CNDDB California Natural Diversity Database
CNPPA California Native Plant Protection Act
CNPS California Native Plant Society
City City of Point Arena
Corps U.S. Army Corps of Engineers
CRLF California red-legged frog
CRPR California Rare Plant Rank
CWA Clean Water Act
EFH Essential Fish Habitat
ESA (Federal) Endangered Species Act
ESHA Environmentally Sensitive Habitat Area
FAC Facultative Wetland Plant Indicator
FACW Facultative Wet Wetland Plant Indicator
HUC Hydrologic Unit Code
LCP City of Point Arena Local Coastal Plan
LUP Land Use Plan
Magnuson-Stevens Act Magnuson-Stevens Fishery Conservation & Management MBBA Mountain beaver buffer area
MBTA Migratory Bird Treaty Act
NMFS National Marine Fisheries Service
OBL Obligate Wetland Plant Indicator
OHWM Ordinary High-Water Mark
PAMB Point Arena Mountain Beaver
RWQCB Regional Water Quality Control Board
SHN SHN, Inc.
SFP State Fully Protected Species
SWRCB State Water Resource Control Board
USDA U.S. Department of Agriculture
USFWS U.S. Fish and Wildlife Service
USGS U.S. Geological Survey
WBWG Western Bat Working Group
WPT Western pond turtle
WRA WRA, Inc.
Environmentally Sensitive Habitat Area Survey
November 2022
WRA, Inc.