POINT ARENA HARBOR & PIER
810 Port Road. | PO Box 67 | Point Arena, CA 95468
(707) 882-2583 | [email protected]
July 2025
DEPARTMENT REPORT
John Biglow
Pier Operations Technician
DUNGENESS CRAB SEASON WRAP-UP
• The 2025 commercial Dungeness crab season has officially closed. • Our dedicated fleet successfully and safely completed the season, landing high-quality crab and efficiently removing all gear from the water and off the pier.
PIER & COVE PREP FOR JULY 4TH
• The end of crab season coincided with the 4th of July holiday. Thanks to hard work and collaboration, the pier and cove were cleaned and prepped in time for the celebration. • The 4th of July festivities were a success, with a strong public turnout and positive feedback on the pier experience.
URCHIN REMOVAL PROJECT
• July marked the return of the purple sea urchin removal project, with strong harvest numbers from participating boats.
• New this year, the removed urchin is being composted locally, creating an added environmental and agricultural benefit for the community.
SPORT FISHING AND TOURISM
• Sport crab fishing remains active and will conclude on July 30th. • Rockfish days have been good, with anglers making the most of calm sea windows. • Tourist and angler numbers have been high, with many visitors enjoying the pier and cove during the busy summer season.
STREETS & PARKS CITY OF POINT ARENA
451 School St. | PO Box 67 | Point Arena, CA 95468
(707) 882-2122 | pointarena.ca.gov
July 2025
DEPARTMENT REPORT
Patrick Hillscan
WW Maintenance Worker
PARKS
Completed Work:
• Regular mowing throughout city parks.
• Tree removal and water tank repair at the Community Garden.
Upcoming/To-Do Items:
• Trim vegetation along park trails.
• Replace irrigation lids and boxes.
• Address play structure maintenance
o Source and install needed parts.
o Fix weed barrier
o Spread new woodchips in the play area.
STREETS
Completed Work:
• Preparation for 4th of July activities.
• Cleared gutters and sidewalks of weeds on Main Street and School Street. • Temporary fix applied to damaged stop sign at Windy Hollow.
Upcoming/To-Do Items:
• Patch potholes across city streets.
• Spray weeds in gutters. (Materials needed: bulk vinegar, salt, Dawn soap, lemon juice concentrate.)
• Repaint traffic stripes and road markings.
• Continue cutting back overgrown vegetation along roadways. • Permanently fix the stop sign at Windy Hollow.
POINT ARENA WASTEWATER TREATMENT
105 Iverson Ave. | PO Box 67 | Point Arena, CA 95468
(707) 882-2700 | [email protected]
July 2025
DEPARTMENT REPORT
Joseph Wilson
Chief Plant Operator
PLANT OPERATIONS & MAINTENANCE
• Regular algae control spraying was conducted at the treatment lagoons. • The plant is currently exceeding the TSS (Total Suspended Solids) monthly limit of 50mg/l. This is an expected seasonal issue tied to increased algae growth due to longer, sunnier days. • Ongoing mowing around percolation ponds and access roads. • Percolation Pond Maintenance:
o Ponds #4 and #2 were plugged and allowed to dry, then successfully ripped and harrowed.
o Ponds #1 and #3 have now been plugged to dry; Ponds #4 and #2 are open again to begin refilling.
o Goal is to rip and harrow Ponds #1 and #3 by late August or early September.
FACILITY ORGANIZATION & VEHICLE MAINTENANCE
• Continued general maintenance tasks.
• Tools and equipment at WWTP are being sorted to reduce clutter and assess needs. • The Ford Ranger work truck has been deep cleaned; note that it will need new tires before winter.
UPCOMING WORK
• Continue seasonal mowing and weed eating throughout the facility grounds. • Plan to jet the entire main line collection system before fall to ensure optimal flow during the rainy season.
• Begin work on a F.O.G. (Fats, Oils, and Grease) program and prepare a draft ordinance for implementation.
REGULATORY & PERMIT COMPLIANCE
• The current permit requires the following by April 2025 (extended by RWQCB to November 2025):
o Disaster Preparedness Assessment Report and Action Plan o Special Study to Evaluate the Potential Impact to Groundwater • Planning to complete these requirements is in process with the City Engineer and City Managment