Cities Index.
CalTrans Point Arena Pavement Rehabilitation and Sidewalk Replacement Project

Point Arena City Council
October 28, 2025

Document
CalTrans Point Arena Pavement Rehabilitation and Sidewalk Replacement Project
Meeting
October 28, 2025
Body
Point Arena City Council
Original file
291 KB
Text extracted from the city's file for reading and search. Open the original on drive.google.com. That file is the official record.

ITEM VIII A
CalTrans: North Point Arena Pavement Rehabilitation and Sidewalk Replacement Project Project Description
Caltrans proposes to construct improvements on State Route 1 (SR1) in Point Arena, Mendocino County from post miles 14.7 to 33.9. Work would include pavement rehabilitation and the replacement of sidewalks, curb ramps and guardrails.

Project Benefit
The purpose of the Route 1 Corridor Project is to provide preventative pavement maintenance and improve the safety and accessibility of pedestrian facilities. The roadway will receive a fullwidth asphalt concrete overlay. Curb ramps and sidewalks will be reconstructed in compliance with the Americans with Disabilities Act (ADA) standards and new guardrails will meet current design standards.

Timeline
Begin Construction: Spring 2027
End Construction: Fall 2028
Project Funding Estimates
• Estimated Total Construction Cost: $30,350,000
Documents
Accessibility Assistance: Caltrans makes every attempt to ensure our documents are accessible.

Due to variances between assistive technologies, there may be portions of this document which are not accessible. Where documents cannot be made accessible, we are committed to providing alternative access to the content. Should you need additional assistance, please contact us at (916) 654-2852 (and/or a division contact) or visit https://dot.ca.gov/request-adacompliant-documents.

Contact Information
Project Manager
Tony Symanovich
(707) 496-4195
Public Information Officer (Media Inquiries)
Manny Machado
(707) 496-6879, TTY 711
Last reviewed: March 2025
Additional Information
Caltrans hosted a public meeting in April 2024 to share project details.

Caltrans staff present at the public meeting in April 2024

← All documents from this meeting