May 2026 Monthly Department Report
Prepared by: Pier Technician Ed Christensen
Completed Activities
• Pressure washed approximately 70% of the wooden railings on the Pier. • Created a maintenance log for the Pier play structure and associated equipment. • Replaced the rear axle assembly on the forklift.
• Repainted parking stalls and crosswalk markings in the Pier parking lot. • Cleaned and organized the Green Shed and converted it into a small workshop space.
• Repaired the dump bed on the flatbed truck.
Upcoming Activities
• Perform routine maintenance on the yellow hoist, product hoist, and electric kayak lift.
• Install cliffside warning signs.
• Address brake issues on the forklift.
• Paint crane swing-zone safety markings on the Pier.
• Install safety chains at open railing locations.
Beginning with next month's report, launch and fish landing activity data will be included, as these figures are now being tracked and logged.
POINT ARENA
STREETS & PARKS
451 School St. | PO Box 67 | Point Arena, CA 95468
May 2026 Monthly Department Report
Prepared by: Patrick Hillscan, Operations Lead – Streets and Parks & Wastewater Maintenance Worker II
This time of year, the primary focus has been keeping up with mowing, weed-eating, and tree trimming throughout the City. Staff have also been preparing for upcoming events, including Pride in the Park and the Fourth of July weekend, while timing maintenance activities to minimize the need for repeated mowing. Street maintenance activity has been somewhat limited this month, as additional time has been spent at the Wastewater Treatment Plant covering operations while Joe continues his recovery.
Streets
• Continued vegetation management in parks and along roadways through mowing, trimming, and weed control.
Projects / Capital Improvements
• Continued cleanup and organization efforts at the Firehouse, Wastewater Treatment Plant, Oil Recycling Shed, and Green Shed.
Equipment and Facilities
• Bucket controls on Big John continue to experience operational issues. • Repaired the dump bed on the flatbed truck. Additional repairs are still needed, but having the dump bed operational will be a significant benefit during the busy summer season.
Issues / Challenges
• Aging equipment continues to require increased maintenance and repairs.
Goals / Priorities for Next Month
• Clear gutters and sidewalks and complete citywide mowing in advance of the Fourth of July holiday.
• Begin a regular street sweeping schedule of once per week.
POINT ARENA CODE ENFORCEMENT
451 School Street | PO Box 67 | Point Arena, CA 95468
(707) 882-2122 | pointarena.ca.gov
May Monthly Department Report
Prepared By: Scott Schnell
SUMMARY
Code Enforcement received two new complaints this month, bringing the year-to-date total to
15. Three new cases were opened for active investigation, two cases achieved voluntary compliance and were closed, and one Notice of Violation was issued. Staff conducted one follow-up inspection and made two referrals to outside agencies.
Complaint activity this month primarily involved junk and debris, vegetation and fire hazards, unpermitted work, unsafe structures, and a right-of-way issue. Significant ongoing efforts included neighborhood sidewalk and vegetation compliance, enforcement of health hazards related to overgrown vegetation, monitoring of an unpermitted construction project under a Stop Work Notice, and resolution of a right-of-way tree planting issue. Staff also successfully closed a long-standing business license compliance case and worked with the Sheriff's Department to resolve vehicle-related parking complaints on Port Road.
ACTIVITY
CATEGORY CURRENT MONTH YEAR TO DATE
Complaints Received 2 15
Cases Opened -Active Investigation 3 5
Cases Opened -Pending Investigation 0 2
Cases Closed – Voluntary Compliance 2 4
Cases Closed – Enforcement Action 0 1
Notice of Violation Issued 1 4
Administrative Citations Issued 0 1
Number of Follow-Up Inspections 1 11
Referrals to Legal/Other Agencies 2 2
COMPLAINT TYPES
TYPE OF VIOLATION NUMBER OF COMPLAINTS
Junk/Debris 2
Vegetation/Fire Hazard 2
Unpermitted Work 2
Unsafe Structures 1
Zoning Violations
Other (Specify) 1 Right of Way Issue
GENERAL DESCRIPTION OF NOTABLE CASES
• Case Summary: Sidewalk cleanup of suburbs/weeds that need trimming at approximately 20 homes or businesses.
• Status: On going to the end of April
• Status: 6 Follow-up Notices issued 10 days or fines will be issued • Status: Notices of Violation Issued for noncompliance of Health Hazard due to overgrown vegetation causing harbinger for vermin/feral cats. • Case Summary: Parking issues on Port Rd. 1 Vehicle parked for several months, 1 Vehicle park with a person sleeping in it. Both were referred to the Sheriff Department, they were tagged and both have been removed by their owners.
• Status: Closed
• Case Summary: Unpaid Business Licenses Fee for 5 years, it took 4 Months and 4 violation notices. This was a very difficult case, and a learning experience. • Status: Closed
• Case Summary: Ongoing construction project with many years of delays and problems.
Site had insufficient construction fencing and screening to provide proper protection for site safety. The developers’ Building Permits had expired, and construction work was proceeding. A Stop Work Notice was issued until new Building Permits are issued by County of Mendocino Building Department.
• Status: No new permits have been issued.
• Case Summary: Trees planted in City Right of Way after much discussion about the issue with the owner an agreement was reached. The city will remove the trees and dispose of them, and no charges will be made to the owner.
• Status: Waiting for the Parks and Grounds to remove the trees.
CITY OF POINT ARENA ADMINISTRATION
451 School Street | P.O. Box 67 | Point Arena, CA 95468 Phone: (707) 882-2122 | pointarena.ca.gov
May 2026 Department Report
Prepared by: Paul Andersen, Assistant City Manager / City Clerk Completed Activities
• Finalized the Windy Hollow funding application for consideration at the June 25– 26 California Transportation Commission meeting.
• Finalized the Mendocino Local Agency Formation Commission (LAFCO) Municipal Service Review for the City of Point Arena.
• Coordinated with Further Reach on the installation of security cameras to monitor the City parking lot and activity near the downtown public restrooms. • Ordered replacement downtown trash receptacles.
• Oversaw operations at the polling location for the June 2, 2026 Primary Election. • Attended a cultural awareness training session.
• Repainted red curbs at Main Street and Port Road.
• Assisted with permitting and coordination for Pride in the Park. • Prepared and posted required public notices.
• Processed accounts payable, deposits, and payroll.
Upcoming Work
• Pursue State Parks grant funding for replacement of the City Park playground and related park improvements.
• Continue curb painting and other downtown safety enhancements. • Provide support for the City’s annual financial audit. • Continue supporting the City Manager with administrative operations, historical knowledge, and institutional continuity.