Cities Index.
Attachment No. 5 - Site Plan

City Council / Housing Authority
March 6, 2023

Document
Attachment No. 5 - Site Plan
Meeting
March 6, 2023
Body
City Council / Housing Authority
Original file
458 KB
Text extracted from the city's file for reading and search. Open the original on pomona.legistar1.com. That file is the official record.

Apartments(By Others)
Breckenridge St.Whistler Street
Existing Warehouse
Existing Medical Office Park
BLDG.701R-C7 UNITSBLDG.701-D7 UNITS

PRIVATE DRIVE AISLEEAST

PRIVATE DRIVE AISLENORTH

PRIVATE DRIVE AISLESOUTH

PRIVATE DRIVE AISLEWEST
Existing Warehouse
#2
BLDG.3013 UNITS#11
BLDG.901-B9 UNITS#1
BLDG.701R-B7 UNITS#10BLDG.701-A7 UNITS#9
#4 BLDG.601R-B6 UNITS#5BLDG.601-A6 UNITS#6
BLDG.6026 UNITS#7
BLDG.901R-A9 UNITS#8
24'
34'
26'10'
9'

16.4'

41.1'

17.4'
13'14.4'

16.2'18.6'
17'16'
5'5' 17'16'
17'16'18.7'14.8'
15'15'
10'10'32.1'17'10'24.7'31.8'
10'
9'

18.3'

18.5'15'

23.6'

25.7'20'
20'25.7'
5'5'

15.4'17.4'

25.7'20'
14'15'

18.8'15'

17.8'

24.6'
Future
#11
1633XR16331636Y
2532R2532R
BLDG.601-C6 UNITS1633R1636R25322532
25322532
2532R2532R16361633 2532R2532R1633R1636R25322532
2532R
2532R
2532
25321636 1636R1636R1633X1633XR1636R1633R1633 #316331633R1636YR1633R1636R1633R1636R1633R1636R1633R1633X 2532R
2532R1636R1633R163316361633X1633XR1636R
2532
2532163616331633R
1633XR163316361633
1636Y1633163616331636
1636YR1633R1636R1633R
1636Y1633
NUMBER OF STORY:

SYMBOL LEGEND:ASSUMEDPROPERTY LINESTREETCENTERLINEPROPERTY LINE PROJECT SUMMARY:TOTAL SITE AREA:3.1 ACRESTOTAL UNITS:20 - PLAN 1: 1210 SF/2 BED/S-S GARAGE30 - PLAN 2: 1494 SF/3 BED/TANDEM GARAGE23 - PLAN 4: 1802 SF/3 BED/S-S GARAGEDENSITY:23.9 DA/ACPARKING PROVIDED:148 SPACES (2 PER UNIT)+ 5 UNCOVERED 153 TOTAL (INCL. ONE ACCESSIBLE SPACE)3 Notes:1. Site plan is for conceptual purposes only. See Civil Eng. drawings for confirmation of all information shown outside of building envelopes.2. Site plan must be reviewed by planning, building, and fire departments for code compliance.3. Base information per parcel map.4. Civil engineer to verify all setbacks and grading information.5. Building Footprints may change due to the final design elevation style.6. Building setbacks are measured from property lines to building foundation lines.GGAS METEREELECTRIC METER Sheet #:Project #:

Issue Date:Revision Date:3/30/22Kevin L. Crook Architect, IncTHE KNOLL A0-1
ARCHITECTURAL SITE PLANN.T.S.

← All documents from this meeting