Mitigation Monitoring and Reporting Program
for the
Pedley Spreading Grounds Pond Enhancements
Project
April 2023
Prepared For:

City of Pomona
Water Resources Department
148 N. Huntington Street
Pomona, California 91768
Prepared By:

Stantec Consulting Services Inc.
300 North Lake Avenue, Suite 400
Pasadena, California 91101
Attachment No. 5

1 MITIGATION MONITORING AND REPORTING PROGRAM

Pedley Spreading Grounds Pond Enhancements Project
Mitigated Negative Declaration
State Clearinghouse Number 2023030023

Introduction

The City of Pomona prepared an Initial Study for the Pe dley Spreading Grounds (PSG) Pond Enhancements Project. Based on the inform ation contained in th e Initial Study, the City intends to adopt a Mitigated Negative Declaration (MND) for the project under the California Environmental Quality Act (C EQA). This Mitigation Monitoring and Reporting Program (MMRP) has been devel oped to ensure implementation of the mitigation measures outlined in the MND (State Clearinghouse No. 2023030023). The MMRP has been prepared by the City of Pomo na, the lead agency for the project under CEQA, in conformance with Public Resources Code Section 21081.6 and CEQA Guidelines Section 15097. Adoption of a MMRP is required for projects in which the Lead Agency has required changes or adopted mitigation to avoid significant environmental effects.

Project Description Summary

In collaboration with the City of Claremont, the City of Pomona intends to capture, treat, and infiltrate local urban runoff into the existing PSG to increas e water supply through stormwater recharge and to decrease non-point source pollutants. The project includes:
grading of the existing PSG basi ns to enhance percolation; modifications to an existing stormwater junction diversion structure; construction of a new control vault to improve stormwater conveyance to the basins; new water quality pret reatment structure; inlet storm drain extensions; energy dissipater a nd riprap pads; stilli ng basin and equalizer structures; spillways, access ramps and road way improvements; and Pedley Filtration Plant outlet interconnect piping and contro ls. Additionally, the project includes implementation of improvements (pathway, plan tings, educational signage, viewing area with benches, and a bike rack) at the Chaparral Park north of the PSG.

The Initial Study describes poten tially significant impacts of the proposed project on biological resources, cultural resources, geology and soils, hazards, water quality, noise, transportation, Tribal cultural resources, and utilities and service systems. Mitigation measures have been defined to reduce imp acts to less than significant levels. Other effects found to be less than significant are also described in the Initial Study.

Mitigation Monitoring and Reporting Responsibility

The City of Pomona shall have primary re sponsibility for administrating the MMRP activities to staff, consultants, or contractor s. The City has the responsibility of ensuring that monitoring is documente d through periodic reports a nd that deficiencies are promptly corrected. The City’s designate d environmental monitor will track and

2 document compliance with mitigation measures , note any problems that may result, and take appropriate action to re medy problems. Specific respons ibilities of the City of Pomona include:

 Coordination of all mitigation monitoring activities
 Management of the preparation, approval, and filing of mon itoring or permit compliance reports
 Maintenance of records concerning the status of all approved mitigation measures  Coordination with other agencies and relevant Tribal representatives

Resolution of Noncompliance Complaints

The City of Pomona Water Resources Departme nt will act as the contact for interested parties who wish to register comments or complaints. Any person or agency may file a complaint that states noncompl iance with the mitigation meas ures that were adopted as part of the approval process for the Pedley Spreading Basins Pond Enhancements Project.

The complaint shall be directed to City of Pomona Water Resources Department (148 N.

Huntington Street, Pomona, California 9176 8) in written form, providing detailed information on the purported violation. The City shall conduct an investigation and determine the validity of the complaint. If noncompliance with a mitigation measure is verified, the City shall take the necessary action(s) to remedy the violation. The complainant shall receive written confirmation indicating the re sults of the investigation or the final corrective action that was implemented to respond to the specific noncompliance issue.

Mitigation Monitoring and Reporting Plan Matrix

The MMRP is organized in a matrix format and includes: mitigation measure by number, impact summary, text of th e mitigation measures, time frame for monitoring, agency responsible, and space to indicate verification that the measures we re implemented. The MMRP matrix includes the mitigation measures identified in the Initial Study. In some cases, mitigation measures to protect biologi cal resources include additional detail to reflect comments received fro m the California Department of Fish and Wildlife.

Additional detail has also been added to the traffic control mitigation measures to reflect comments received from the California Depar tment of Transportation. The verification columns will be used to document the pers on who verified the implementation of the mitigation measure, the date on which this verification occurred, a nd any other notable remarks.

3 MITIGATION MONITORING AND REPORTING PROGRAM
SCH # 2023030023
Pedley Spreading Grounds Pond Enhancement Project
Mitigated Negative Declaration

No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
AES-1 Proposed
facilities could
be inconsistent
with the visual
character of the
local area.

Design Standards
 Proposed facilities, including walls, gates,
treatment facilities, etc., shall be designed in
accordance with local design standards in
order to be complementary to the local area.

Landscaping shall be installed and
maintained in conformance with local
landscaping design guidelines as appropriate
to screen views of new facilities from
surrounding areas to the extent feasible
taking into consideration the needs of the
project and except where such compliance is
not required by California law.

Design phase City of Pomona

BR-1 Construction
activity may
negatively
impact
biological
resources
including
sensitive plant
and animal
species.

Plant and Wildlife Preconstruction Clearance
Surveys and Biological Monitoring
 Prior to ground disturbance or vegetation
clearing within the proposed project site, a
qualified biologist shall conduct
preconstruction plant surveys and wildlife
clearance surveys (no more than 7 days prior
to site disturbing activities) where suitable
habitat is present and will be directly
impacted by construction activities.

Plants

 Season-appropriate, focused rare plant
surveys shall be conducted for intermediate
mariposa-lil
y (Calochortus weedii var.

Clearance
surveys no more
than 7 days prior
to ground
disturbance for
project
construction

Focused plant
surveys May –
September prior
to the start of
construction

Monitoring for
first week of
City of Pomona

[Sensitive
species
observations to
be reported to
CDFW and/or
USFWS as
relevant]

4 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
intermedius), lucky morning glory (Calystegia
felix), white rabbit tobacco
(Pseudognaphalium leucocephalum), and
Sanford’s arrowhead (Sagittaria sanfordii).

 If a rare plant species is found, it will be
fenced and avoided. If it cannot be avoided,
then an appropriate relocation strategy shall
be developed and coordinated with the
California Department of Fish and Wildlife
(CDFW) and/or the U.S. Fish and Wildlife
Service (USFWS).

 If project -related impacts result in the loss of
more than 10% of the on-site (biological
study area) population of any California Rare
Plant Ranks (CRPR) plant species,
compensatory mitigation will be required.

Compensation will be required for all impacts
that exceed the 10% threshold (e.g. impacts
to 15% of a population will only require
compensation for 5% or the amount of
impacts that exceed the 10% threshold).

Compensation for permanent impacts to
CRPR species may be achieved either by a)
on-site habitat creation or enhancement of
impacted communities with similar species
compositions to those present prior to
construction, b) off-site creation or
enhancement of relevant plant communities,
or c) participation in an established mitigation
bank program at a 1:1 mitigation ratio (1 acre
preserved for each acre impacted).

Compensation for temporary impacts will be
at a 0.5:1 ratio.

Enhanced/restored habitat for an impacted
construction and
minimally
weekly
thereafter
throughout the
construction
period

5 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
plant species shall be of equal or greater
habitat quality to the impacted areas in terms
of soil features, extent of disturbance, and
vegetation structure. Details of the enhanced
or restored habitat shall be presented in the
Habitat Mitigation and Monitoring Plan
required under BR-4 below.

Animals
 Preconstruction surveys for common and
special-status wildlife shall also include
focused surveys in suitable habitat for
Southern California legless lizard (Anniella
stebbinsi) and San Diego woodrat (Neotoma
lepida intermedia).

 If sensitive wildlife species are detected, the
qualified biologist shall use visible flagging to
mark the location where the sensitive wildlife
species was detected. The qualified biologist
shall take a photo of each location, map each
location, and provide the specific species
detected at that location. The qualified
biologist shall provide a summary report of
sensitive wildlife species surveys to the City
before any project-related ground-disturbing
construction activities. CDFW shall be
notified and consulted regarding the
presence of any special-status wildlife
species found on site during surveys prior to
ground-disturbing construction activities.

 If an Endangered Species Act-listed species
is found prior to or during grading of the site,
the USFWS shall also be notified.

 If sensitive wildlife species are detected,

6 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
individuals shall be protected or allowed to
move away on their own (non-invasive,
passive relocation) to adjacent appropriate
habitat within the open space on-site or in
suitable habitat adjacent to the project area
(at least 200 feet from the grading limits).

Where active relocation is required, special
status wildlife shall be captured by a qualified
biologist with proper handling permits. The
qualified biologist shall prepare a species-
specific list (or plan) of proper handling and
relocation protocols. The list (or plan) of
protocols shall be implemented during
construction. The City/qualified biologist may
consult with CDFW/USFWS to prepare
species-specific protocols for proper handling
and relocation procedures. Only a USFWS
approved biologist shall be authorized to
capture and relocate Federal ESA-listed
species. A relocation plan shall be prepared
prior to implementing project-related ground-
disturbing activities.

 If any sensitive species are harmed during
relocation or a dead or injured animal
(sensitive species) is found, work in the
immediate area shall stop immediately, the
qualified biologist shall be notified, and dead
or injured wildlife documented immediately.

The project biologist shall contact the
USFWS, CDFW, and the City by telephone
by the end of the day, or at the beginning of
the next working day if the agency office is
closed. In addition, a formal report shall be
sent to the City, CDFW, and USFWS (as
appropriate
) within three calendar days of the

7 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
incident or finding. The report shall include
the date, time of the finding or incident (if
known), and location of the carcass or injured
animal and circumstances of its death or
injury (if known). Work in the immediate area
may resume once the proper notifications
have been made and mitigation measures
have been identified to prevent additional
injury or death.

 Common wildlife found within the project site
or in areas potentially affected by the
proposed project shall be relocated to the
nearest suitable habitat that would not be
affected by the proposed project prior to the
start of construction.

Biological Monitoring
 A qualified biologist shall be on site during
initial ground disturbance activities (minimally
for the first week of construction). Thereafter,
monitoring shall be conducted at a minimum
of once per week throughout the construction
phase. The qualified biologist(s) shall have
the right to halt all activities that are in
violation of sensitive species protection
measures. Work shall proceed only after
sensitive species are relocated or allowed to
leave the site, and the species is no longer at
risk.

BR-2 Construction
may impact
nesting birds if
any are present
on the project
site.

Nesting Bird Surveys and Avoidance
Measures
 If initial site disturbance is scheduled to begin
during the avian nesting season (February 1
through August 31; January 1 through
August 31 for raptors), breeding and nesting
Surveys no
more than 3
days prior to
ground
disturbance for
project
City of Pomona

8 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
bird surveys shall be conducted by a
qualified biologist no more than 3 days prior
to the start of site disturbance. If construction
activities carry over into a second nesting
season(s), the surveys shall be completed
annually until the proposed project is
complete. Surveys shall be conducted within
500 feet of all proposed project activities.

 The City of Pomona shall coordinate with
USFWS if a federally endangered or
threatened species is observed. The City of
Pomona shall coordinate with CDFW if a
State- endangered or threatened species is
observed. If a CDFW species of special
concern is observed nesting, it shall be
reported to CDFW.

 If breeding birds with active nests are found
prior to or during construction, a qualified
biological monitor shall establish a 300-foot
buffer around the nest, and no activities shall
be allowed within the buffer(s) until the young
have fledged from the nest or the nest fails;
initial buffers for nesting raptors shall be 500
feet. The prescribed buffers for common
species may be adjusted by the qualified
biologist based on existing conditions around
the nest, planned construction activities,
tolerance of the species, and other pertinent
factors; for example, buffers for common
passerines, often found to be habituated to
human activity, may be adjusted down to 25 -
50 feet depending on the disturbance
tolerance of each specific species.

construction if
construction will
start between
January 1
through August
31)

Active nests
shall be
monitored
weekly.

9 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks

 Buffer adjustments for listed and/or other
sensitive species shall be done in
coordination with the USFWS and CDFW, as
applicable. The qualified biologist shall
conduct weekly monitoring of the nest to
determine success or failure and to ensure
that proposed project activities are not
conducted within the buffer(s) until the
nesting cycle is complete or the nest fails.

BR-3 Construction
activity may
negatively
impact
biological
resources
present on the
project site.

Environmental Awareness Training
 Prior to initial ground disturbance, all project
personnel shall attend an environmental
awareness and compliance training program.

The training program shall include review of:
1) applicable environmental regulations and
permit conditions, 2) project boundaries; 3)
special-status species that may be present,
their habitat, and proper identification; and 4)
the applicable measures established for the
proposed project to minimize impacts to
avoid sensitive resources, habitats, and
species.

 The qualified biologist shall communicate to
construction workers that upon encounter
with a sensitive species, work must stop in
the vicinity of the find, the project biologist
must be notified, and work may only resume
in the area of the find once the biologist has
determined that it is safe to do so.

 Subsequent training events shall be
scheduled to support the training of new
personnel. Dated sign-in sheets for
attendees at these meetin
gs shall be
Prior to the start
of construction
for initial
construction
personnel

Prior to the start
of work for
personnel who
join the project
during
construction
City of Pomona

10 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
maintained and submitted to the City of
Pomona.

BR-4 Construction
may impact
sensitive
riparian (i.e.,
mulefat
thickets)
habitats
present in the
area proposed
for basin
enhancement.

Riparian Vegetation Removal and
Replacement
 Construction activities shall be done in such
a manner as to minimize the removal of
native riparian vegetation (i.e., mulefat
thickets). If impacts to native riparian
vegetation removal cannot be avoided, the
compensation for the permanent loss of
habitats may be achieved either by a) on-site
habitat creation or enhancement of impacted
communities with similar species
compositions to those present prior to
construction, b) off-site creation or
enhancement of the impacted community
type (or similar communities), or c)
participation in an established mitigation
bank program. Permanent impacts to native
communities shall be restored/mitigated at a
minimum of a 2:1 ratio for on or off-site
habitat restoration/creation or participation in
an established mitigation banking program.

 Prior to the start of any project related
activities (including removal of native
vegetation), if on- or off-site mitigation is
required, an ecosystem-based Habitat
Mitigation and Monitoring Plan shall be
prepared by persons with expertise in
southern California ecosystems and native
plant restoration techniques that will guide all
restoration and monitoring activities. This
plan shall include, at a minimum, the
following:
 Provide the total acrea
ge of unique
Plan preparation
prior to the start
of construction

City of Pomona

11 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
sensitive vegetation communities
impacted, and abundance, density, and
cover of each plant species and
vegetation layer impacted (i.e., ground
cover, forbs, subshrub, shrub, and trees).
 Provide the specific location of on- and/or
off-site mitigation area(s) and a science
based factual discussion as to why the
mitigation area(s) is appropriate for
mitigating project-related impacts.

Describe the environmental features (i.e.,
soils, slope, existing vegetation,
hydrology) that would suggest the
mitigation area(s) can support the
vegetation and wildlife impacted by
project activities.
 Provide a vegetation survey conducted at
a reference site containing the vegetation
communities being mitigated, with as
good or better-quality habitat, to
document the density, abundance,
diversity, and percent cover for each
species by vegetation layer.
 A schematic depicting the mitigation
area.
 Proposed species list for
creation/enhancement. A plant palette
shall consist of species that are diverse
with respect to growing duration (annual,
perennial), life form (grasses, shrubs,
trees, vines), and structure (ground
cover, shrubs, tree canopy) that form the
vegetation alliance that is being
mitigated.
 Planting/seeding methodology (e.g.,
sources of local propagules, container
sizes, and seedin
g rates).

12 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
 Planting schedule.
 Irrigation plan.
 Weeding schedule; and invasive plant
control methods that reduce or eliminate
the use of chemicals.
 Success criteria.
 Monitoring methodology and schedule
extended across a sufficient time frame
to ensure that the new habitat is
established, self-sustaining, and capable
of surviving drought.
 Reporting requirements.

BR-5 Construction
may impact
suitable habitat
for Crotch’s
bumble bee.

Crotch’s Bumble Bee
 Within 1 year prior to vegetation removal
and/or grading, a qualified biologist familiar
with the species behavior and life history
shall conduct surveys to determine the
presence/absence of Crotch’s bumble bee; a
minimum of three survey events, spaced at
least one week apart shall be conducted.

Surveys shall be conducted during flying
season when the species is most likely to be
detected above ground, between March 1 to
September 1. A survey report shall be
prepared.

 If Crotch’s bumble bee is detected, the City,
in consultation with a qualified biologist, shall
develop an avoidance plan prior to
implementing project-related ground-
disturbing activities and/or vegetation
removal where there may be impacts to
Crotch’s bumble bee.

 If Crotch’s bumble bee is detected and if
impacts to Crotch’s bumble bee cannot be
Survey within 1
year prior to
construction
start

Avoidance plan
to be
implemented, as
relevant, during
construction
City of Pomona

(If Crotch’s
bumble bee is
present,
coordination
with CDFW)

13 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
feasibly avoided during project construction,
the City shall coordinate with CDFW to obtain
appropriate permits for incidental take of
Crotch’s bumble bee and provide appropriate
mitigation for impacts to Crotch’s bumble bee
habitat.

CR-1 Construction
will occur
adjacent to
historic and
potentially
historic
structures.

Historic Resources Avoidance
 During project construction, no earthwork or
other construction activity shall occur which
disturbs the Pedley Filtration Plant or the
historic distribution line (PED-BC-01 - 12KV
Pitzer Distribution Line Segment). In the
event that these structures cannot be
avoided, additional evaluation would be
required.

During
construction

CR-2 Construction
has the
potential to
disturb
previously
unknown
cultural
resources at
the project site.

Archaeological Awareness Training
 All construction workers and supervisors
shall attend a mandatory workshop providing
information on cultural resources that may be
present in the project vicinity; penalties for
unauthorized collection of artifacts; and the
need to temporarily redirect work away from
the location of any unanticipated discovery
until it is recorded and adequately
documented and treated. The presentation
shall be available to train additional
personnel who may join the construction
crew after the initial training.

Prior to the start
of construction
for initial
construction
personnel

Prior to the start
of work for
personnel who
join the project
during
construction

14 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
CR-3 Construction
has the
potential to
disturb
previously
unknown
cultural
resources at
the project site.

Unanticipated Discoveries
 If previously unrecorded cultural resources
are encountered at any time during project
construction, all work shall cease within 60
feet of the discovery until the find can be
evaluated by a qualified archaeologist who
meets the Secretary of the Interior standards.

Work on the other portions of the project
outside of the buffered area may continue
during this assessment period. If determined
to be potentially significant, and if the
resource cannot be avoided, a Monitoring
and Treatment Plan shall be developed
within 48-hours of the discovery. Appropriate
Native Americans as identified by the NAHC
would be notified of the find and provided a
copy of the draft Monitoring and Treatment
Plan so as to provide Tribal input with
regards to significance and treatment of the
find. Work shall not resume in areas
determined by the archaeologist as sensitive
until the discovery has been evaluated and
the recommendations for treatment have
been implemented.

During
construction
City of Pomona

(Notifications to
relevant tribes,
as warranted)

CR-4 Although
unlikely,
construction
has the
potential to
disturb
previously
unknown
human remains
and associated
funerary
objects at the
Unanticipated Human Remains
 In the unexpected event that human remains
or funerary objects are uncovered at a
project site, there shall be no further
excavation or disturbance of the site or any
nearby area reasonably suspected to overlie
adjacent human remains (minimum of 200-ft
buffer of the find) until:
 The coroner of the county in which the
remains are discovered must be
contacted to determine whether an
investi
gation of the cause of death is
Construction
and operation
City of Pomona

(Los Angeles
County Coroner
shall be
contacted if
human remains
discovered.)

(Notifications to
relevant tribes,
as warranted)

15 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
project site. required, and
 If the coroner determines the remains to
be Native American:
 The coroner shall contact the Native
American Heritage Commission
within 24 hours.
 The Native American Heritage
Commission shall identify the person
or persons it believes to be the most
likely descended from the deceased
Native American.
 The most likely descendent may
make recommendations to the
landowner or the person responsible
for the excavation work, for means of
treating or disposing of, with
appropriate dignity, the human
remains and any associated grave
goods as provided in Public
Resources Code Section 5097.98.
 Where the following conditions occur, the
City of Pomona or authorized
representative shall rebury the Native
American human remains and
associated grave goods with appropriate
dignity on the property in a location not
subject to further subsurface disturbance:
 The Native American Heritage
Commission is unable to identify a
most likely descendent or the most
likely descendent failed to make a
recommendation within 24 hours
after being notified by the
commission;
 The descendant identified fails to
make a recommendation; or
 The Cit
y of Pomona or authorized

16 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
representative rejects the
recommendation of the descendant,
and the mediation by the Native
American Heritage Commission fails
to provide measures acceptable to
the landowner.

GE-1 Construction
has the
potential to
disturb
previously
unknown
paleontological
resources at
the project site.

Paleontological Monitoring and Mitigation
Plan
 A paleontologist meeting professional
standards as defined by Murphey et al.
(2019) shall be retained as the Project
Paleontologist to oversee all aspects of
paleontological mitigation, including the
development and implementation of a
Paleontological Monitoring and Mitigation
Plan (PMMP) tailored to the project plans
that provides for paleontological monitoring
of earthwork and ground disturbing activities
into undisturbed geologic units with high
paleontological potential to be conducted by
a paleontological monitor meeting industry
standards (Murphey et al., 2019). A final
monitoring report summarizing the results of
the monitoring program should be prepared
at the conclusion of project ground
disturbance.

Construction City of Pomona

GE-2 Construction
has the
potential to
disturb
previously
unknown
paleontological
resources at
the project site.

Workers’ Environmental Awareness Training
 The PMMP shall include provisions for a
Workers’ Environmental Awareness Training
Program that communicates requirements
and procedures for the inadvertent discovery
of paleontological resources during
construction, to be delivered by the
paleontological monitor to the construction
crew prior to the onset of
ground disturbance.

Prior to the start
of construction
for initial
construction
personnel

Prior to the start
of work for
personnel who
City of Pomona

17 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
join the project
during
construction
GE-3 Construction
has the
potential to
disturb
previously
unknown
paleontological
resources at
the project site.

Paleontological Monitoring
 The PMMP shall provide for full time
paleontological monitoring of grading in the
existing basins at any depth, and of other
ground disturbing activities that exceed 5 feet
in depth below the natural ground surface in
previously undisturbed sediments. The
Project Paleontologist may reduce the
frequency of monitoring or spot checks
should subsurface conditions indicate low
paleontological potential.

During
construction

Daily logs shall
be maintained
by the monitor.

City of Pomona

(University of
California
Museum of
Paleontology for
discoveries, if
relevant)

GE-4 Construction
has the
potential to
disturb
previously
unknown
paleontological
resources at
the project site.

Paleontological Resource Salvage
 Should a potential paleontological resource
be identified in the project area, whether by
the monitor or a member of the construction
crew, work should halt in a safe radius
around the find (usually 50 feet) until the
Project Paleontologist can assess the find
and, if significant, salvage the fossil for
laboratory preparation and curation at the
Natural History Museum of Los Angeles
County.

During
construction, if
warranted
City of Pomona

(University of
California
Museum of
Paleontology for
discoveries, if
relevant)

18 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
HZ-1 Expanded use
of the basins
would result in
additional days
of wetted area
and potentially
increased
habitat for
mosquitos,
midges, or
other vectors.

Vector Management
 The City of Pomona shall coordinate the San
Gabriel Valley Mosquito and Vector Control
District (SGVMVCD) to develop a
strategy/plan to minimize the occurrence of
vectors, such as midges and mosquitos; and
to establish protocols for monitoring and
eradicating vectors should they be found
when basins are in use (filled with water).

Monitoring to determine presence/absence of
vectors during periods when recharge basins
are holding water shall be the responsibility
of the City of Pomona to engage the services
of a vector control professional. Should
monitoring have positive results, the vector
control professional shall work with the
SGVMVCD to implement control measures
as set forth in the approved strategy/plan.

The strategy/plan shall be prepared and
available to be implemented prior to initiating
the use of the expanded recharge basins.

Project
operation
City of Pomona

(SGVMVCD)

HYD-1 Construction
activities have
the potential
degrade
stormwater
quality.

Implementation of a SWPPP and the Use of
BMPs During Construction
 Prior to commencement of any ground
disturbing activities for the PSG project, the
construction contractor shall prepare a
Stormwater Pollution Prevention Plan
(SWPPP) and submit a Notice of Intent (NOI)
to the State Water Resources Control Board
(SWRCB). Implementation of best
management practices (BMPs) as outlined in
the SWPPP shall be on-going during
construction activities. A copy of the SWPPP
and the Waste Discharge Identification
(WDID) number, shall be kept at the
construction site and be available for review
Prior to the start
of construction

BMP
implementation
during
construction
City of Pomona

19 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
by inspectors until construction is completed.

HYD-2 Construction
dewatering, if
relevant, has
the potential to
degrade
surface water
quality.

Dewatering General Permit
 Prior to commencement of construction
activities that would require dewatering and
conveyance of groundwater to surface water
including but not limited to a storm drain
system, a NOI shall be submitted to the
SWRCB under the requirements of the
Dewatering General Permit. The NOI shall
include any additional information including a
list of BMPs for preventing degradation of
water quality or impairment of receiving
waters.

Prior to
dewatering
during
construction, if
relevant
City of Pomona
N-1 Construction
noise could
impact
sensitive
receptors.

Construction Noise Plan
 The construction contractor shall develop
and implement a focused construction noise
mitigation plan to ensure compliance with the
City of Claremont construction noise limits
established in Municipal Code 16.154
Environmental Protective Standards Section
316.154.020. Where construction noise
would exceed the noise levels and time
periods specified, the construction contractor
shall install temporary noise barriers, use
alternative scheduling, or use alternative
equipment. As part of the Noise Mitigation
Plan, the City of Pomona will notify (at least 2
weeks in advance of the start of construction)
residents and the Chaparral Elementary
School adjacent to the PSG and storm drain
improvement locations as to the schedule for
construction.

Plan to be
developed
before the start
of construction

Plan
implementation
during
construction
City of Pomona

20 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
N-2 Construction
noise could
impact
sensitive
receptors.

Construction Equipment Maintenance and
Placement
 During project site construction, the
construction contractor shall ensure that all
construction equipment, fixed or mobile, shall
have properly operating and maintained
mufflers, consistent with manufacturers’
standards. The construction contractor shall
place all stationary construction equipment
so that emitted noise is directed away from
the noise-sensitive receivers nearest the
project site.

Construction City of Pomona
N-3 Construction
noise could
impact
sensitive
receptors.

Equipment Staging
 The construction contractor shall locate
equipment staging in areas that will create
the greatest distance between construction-
related noise sources and noise-sensitive
receivers nearest the project site during all
project construction (i.e., the center of each
site).

Construction City of Pomona
N-4 Construction
noise could
impact
sensitive
receptors.

Construction Haul Routes
 The construction contractor shall design
delivery routes for equipment and materials
to minimize the exposure of sensitive land
uses or residential dwellings to delivery truck-
related noise.

Prior to the start
of construction
City of Pomona

21 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
N-5 Construction
noise could
impact
sensitive
receptors.

Operational Noise Minimization
 All trucks transiting on-site in outdoor areas
of the project facilities shall be operated with
properly functioning and well-maintained
mufflers. Pavement conditions at PSG shall
be maintained to be free of vertical deflection
(i.e., speed bumps) to minimize truck noise.

Truck access gates and loading areas shall
have posted signs which state:

1. Truck drivers shall turn off engines
when not in use.

2. No music or electronically reinforced
speech from workers shall be audible
at noise-sensitive properties.

Construction City of Pomona
TR-1 Project
construction
will impact
traffic on area
roadways.

Construction Traffic Management Plan
 Prior to commencement of construction
activities at a project site, the construction
contractor shall develop and implement an
approved Construction Traffic Management
Plan addressing potential construction-
related traffic detours and disruptions. In
general, the Construction Traffic
Management Plan would ensure that to the
extent practical, construction traffic would
access a project site during off-peak hours or
limit access during the peak hours; and that
construction traffic would be routed to avoid
travel through, or proximate to, sensitive land
uses. The Plan shall also include, where
necessary, the use of flags, signs and lights,
as well as flag persons to direct traffic. As
part of the Plan, construction workers shall
be encouraged to carpool or utilize public
transportation, when possible, to the project
sites.

Plan
development
prior to the start
of construction

Plan
implementation
during
construction
City of Pomona

22 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
TR-2 Project
construction
will impact
traffic on area
roadways.

Heavy Equipment Travel
 As part of the Co nstruction Traffic
Management Plan, it shall be stipulated that
the delivery and removal of heavy equipment
shall be conducted during off-peak hours to
minimize heavy truck activity during the
morning and evening peak periods (7 am to 9
am and 4 pm to 6 pm) in order to have
nominal impacts to traffic and circulation near
the vicinity of the project.

Construction City of Pomona
TR-3 Project
construction
will impact
traffic on area
roadways.

Haul Trucks
 During site grading, where export of material
is required, the construction contractor shall
limit export activity between the hours of 7
am to 9 am (morning peak period) and 4 pm
to 6 pm (evening peak period) to fewer than
the equivalent of 50 passenger car
equivalent (PCE) truck trips per hour. 50
PCE truck trips equates to approximately 16
total trucks (8 trucks in and 8 trucks out)
during the peak periods specified above in
order to limit the potential impacts of haul
truck activity during these busy commute
times. [50 PCE truck trips / 3.0 PCE factor =
16 total trucks during the peak hour]

 During construction, soil hauling trucks
traveling on State highways shall be covered
with tarpaulin to avoid spilling debris onto
State facilities.

Construction City of Pomona
TCR-1 Tribal
coordination
will be on-going
during the
project.

Tribal Notification
 Tribal contacts identified by the NAHC
(including the Yuhaaviatam of San Manuel
Nation Cultural Resources Department
(YSMN) and the Gabrieleño Band of Mission
Construction
and operations
City of Pomona

(Notifications to
relevant tribes,
as warranted)

23 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
Indians – Kizh Nation) shall be contacted of
any pre-contact and/or historic-era cultural
resources discovered during project
implementation, and be provided information
regarding the nature of the find, so as to
provide Tribal input with regards to
significance and treatment. Should the find
be deemed significant, as defined by CEQA
(as amended, 2015), a Cultural Resources
Monitoring and Treatment Plan shall be
created by the qualified archaeologist, in
coordination with relevant Tribes, and all
subsequent finds shall be subject to this
Plan. In the event of a significant find, the
Plan shall allow for coordination of Native
American monitoring by the YSMN and the
Gabrieleño Band of Mission Indians – Kizh
Nation.

TCR-2 Tribal
coordination
will be on-going
during the
project.

Document Coordination
 As requested, the City of Pomona shall
provide archaeological/cultural documents
created as a part of the project (isolate
records, site records, survey reports, testing
reports, etc.) to Tribes identified by the
NAHC. The City of Pomona shall, in good
faith, consult with interested Tribes identified
by the NAHC throughout the life of the
project.

Construction
and operations
City of Pomona

(Notifications to
relevant tribes,
as warranted)

TCR-3 Project
construction
has the
potential to
negatively
impact tribal
cultural
Retain a Native American Monitor Prior to
Commencement of Ground-Disturbing
Activities
A. The City of Pomona shall retain a Native
American Monitor from or approved by the
Gabrieleño Band of Mission Indians – Kizh
Nation. The monitor shall be retained prior to
Monitor shall be
present during
ground-
disturbing
phases of
project
construction.

City of Pomona

Gabrieleño
Band of Mission
Indians – Kizh
Nation

24 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
resources. the commencement of any “ground-
disturbing activity” for the subject project at
all project locations (i.e., both on-site and any
off-site locations that are included in the
project description/definition and/or required
in connection with the project, such as public
improvement work). “Ground-disturbing
activity” shall include, but is not limited to,
demolition, pavement removal, potholing,
auguring, grubbing, tree removal, boring,
grading, excavation, drilling, and trenching.

B. A copy of the executed monitoring
agreement shall be submitted to the City of
Pomona prior to the earlier of the
commencement of any ground-disturbing
activity, or the issuance of any permit
necessary to commence a ground-disturbing
activity.

C. The monitor will complete daily monitoring
logs that will provide descriptions of the
relevant ground-disturbing activities, the type
of construction activities performed, locations
of ground-disturbing activities, soil types,
cultural-related materials, and any other
facts, conditions, materials, or discoveries of
significance to the Tribe. Monitor logs will
identify and describe any discovered TCRs,
including but not limited to, Native American
cultural and historical artifacts, remains,
places of significance, etc., (collectively,
tribal cultural resources, or “TCR”), as well as
any discovered Native American (ancestral)
human remains and burial goods. Copies of
monitor logs will be provided to the City of
Pomona upon written request to the Tribe.

Daily logs shall
be maintained
by the monitor.

25 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks

D. On-site tribal monitoring shall conclude
upon the latter of the following (1) written
confirmation to the Kizh from a designated
point of contact for the City of Pomona that
all ground-disturbing activities and phases
that may involve ground-disturbing activities
on the project site or in connection with the
project are complete; or (2) a determination
and written notification by the Kizh to the City
of Pomona that no future, planned
construction activity and/or
development/construction phase at the
project site possesses the potential to impact
Kizh TCRs.

E. Upon discovery of any TCRs, all
construction activities in the immediate
vicinity of the discovery shall cease (i.e., not
less than the surrounding 60 feet) and shall
not resume until the discovered TCR has
been fully assessed by the Kizh monitor
and/or Kizh archaeologist. The Kizh will
recover and retain all discovered TCRs in the
form and/or manner the Tribe deems
appropriate, in the Tribe’s sole discretion,
and for any purpose the Tribe deems
appropriate, including for educational,
cultural and/or historic purposes.

26 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
TCR-4 Although
unlikely, project
construction
has the
potential to
disturb
previously
unknown
human remains
and associated
funerary
objects.

Unanticipated Discovery of Human Remains
and Associated Funerary Objects

A. Native American human remains are
defined in PRC 5097.98 (d)(1) as an
inhumation or cremation, and in any state of
decomposition or skeletal completeness.

Funerary objects, called associated grave
goods in Public Resources Code Section
5097.98, are also to be treated according to
this statute.

B. If Native American human remains and/or
grave goods are discovered or recognized on
the project site, then all construction activities
shall immediately cease. Health and Safety
Code Section 7050.5 dictates that any
discoveries of human skeletal material shall
be immediately reported to the County
Coroner and all ground-disturbing activities
shall immediately halt and shall remain
halted until the coroner has determined the
nature of the remains. If the coroner
recognizes the human remains to be those of
a Native American or has reason to believe
they are Native American, he or she shall
contact, by telephone within 24 hours, the
Native American Heritage Commission, and
Public Resources Code Section 5097.98
shall be followed.

C. Human remains and grave/burial goods
shall be treated alike per California Public
Resources Code section 5097.98(d)(1) and
(2).

D. Construction activities ma
y resume in
Construction
and operations
City of Pomona

(Los Angeles
County Coroner
shall be
contacted if
human remains
discovered.)

(Notifications to
relevant tribes,
as warranted)

27 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
other parts of the project site at a minimum of
200 feet away from discovered human
remains and/or burial goods, if the Kizh
determines in its sole discretion that
resuming construction activities at that
distance is acceptable and provides the
project manager express consent of that
determination (along with any other feasible
mitigation measures the Kizh monitor and/or
archaeologist deems necessary). (CEQA
Guidelines Section 15064.5(f).)

E. Preservation in place (i.e., avoidance) is
the preferred manner of treatment for
discovered human remains and/or burial
goods. Any historic archaeological material
that is not Native American in origin (non-
TCR) shall be curated at a public, non-profit
institution with a research interest in the
materials, such as the Natural History
Museum of Los Angeles County or the
Fowler Museum, if such an institution agrees
to accept the material. If no institution
accepts the archaeological material, it shall
be offered to a local school or historical
society in the area for educational purposes.

F. Any discovery of human remains/burial
goods shall be kept confidential to prevent
further disturbance.

28 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
TCR-5 Procedures for Burials and Funerary Remains

A. As the Most Likely Descendant (“MLD”),
the Koo-nas-gna Burial Policy shall be
implemented. To the Tribe, the term “human
remains” encompasses more than human
bones. In ancient as well as historic times,
Tribal Traditions included, but were not
limited to, the preparation of the soil for
burial, the burial of funerary objects with the
deceased, and the ceremonial burning of
human remains.

B. If the discovery of human remains
includes four or more burials, the discovery
location shall be treated as a cemetery and a
separate treatment plan shall be created.

C. The prepared soil and cremation soils are
to be treated in the same manner as bone
fragments that remain intact. Associated
funerary objects are objects that, as part of
the death rite or ceremony of a culture, are
reasonably believed to have been placed
with individual human remains either at the
time of death or later; other items made
exclusively for burial purposes or to contain
human remains can also be considered as
associated funerary objects. Cremations will
either be removed in bulk or by means as
necessary to ensure complete recovery of all
sacred materials.

D. In the case where discovered human
remains cannot be fully documented and
recovered on the same day, the remains will
be covered with muslin cloth and a steel
City of Pomona

(Notifications to
relevant tribes,
as warranted)

29 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
plate that can be moved by heavy equipment
placed over the excavation opening to
protect the remains. If this type of steel plate
is not available, a 24-hour guard should be
posted outside of working hours. The Tribe
will make every effort to recommend
diverting the project and keeping the remains
in situ and protected. If the project cannot be
diverted, it may be determined that burials
will be removed.

E. In the event preservation in place is not
possible despite good faith efforts by the City
of Pomona, before ground-disturbing
activities may resume on the project site, the
City of Pomona shall arrange a designated
site location within the footprint of the project
property for the respectful reburial of the
human remains and/or ceremonial objects.

F. Each occurrence of human remains and
associated funerary objects will be stored
using opaque cloth bags. All human remains,
funerary objects, sacred objects and objects
of cultural patrimony will be removed to a
secure container on site if possible. These
items should be retained and reburied within
six months of recovery. The site of
reburial/repatriation shall be on the project
property but at a location agreed upon
between the Tribe and the City of Pomona at
a site to be protected in perpetuity. There
shall be no publicity regarding any cultural
materials recovered.

G. The Tribe will work closely with the
pro
ject’s qualified archaeologist to ensure

30 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
that the excavation is treated carefully,
ethically, and respectfully. If data recovery is
approved by the Tribe, documentation shall
be prepared and shall include (at a minimum)
detailed descriptive notes and sketches. All
data recovery-related forms of
documentation shall be approved in advance
by the Tribe. If any data recovery is
performed, once complete, a final report shall
be submitted to the Tribe and the NAHC. The
Tribe does NOT authorize any scientific
study or the utilization of any invasive and/or
destructive diagnostics on human remains.

UTIL-1 Implementation of a Construction and
Demolition Disposal Plan
 Prior to commencement of construction, the
construction contractor shall prepare a
Construction and Demolition (C&D) disposal
plan for review and approval by the City of
Claremont. Per California Green Building
Standards Code Section 45.408.1.1,
Construction Waste Management Plan, the
C&D Disposal Plan shall:
 Identify the construction and demolition
waste materials to be diverted from
disposal by efficient usage, recycling,
reuse on the project or salvage for future
use or sale.
 Determine if construction and demolition
waste materials will be sorted on-site
(source-separated) or bulk mixed (single
stream).
 Identify diversion facilities where
construction and demolition waste
material collected will be taken.
 Specif
y that the amount of construction
Prior to
construction
City of Pomona

31 No. Impact Mitigation Measure Time Frame for
Implementation
Responsible
Monitoring
Agency

(Reviews)
Verification of Compliance
Initials Date Remarks
and demolition waste materials diverted
shall be calculated by weight or volume,
but not by both.