Cities Index.
Attachment No. 4 - Site Plan

City Council / Housing Authority
June 5, 2023

Document
Attachment No. 4 - Site Plan
Meeting
June 5, 2023
Body
City Council / Housing Authority
Original file
1.1 MB
Text extracted from the city's file for reading and search. Open the original on pomona.legistar1.com. That file is the official record.

SITE PLAN
PHONE: 909-262-2033
CLAREMONT CA 91711
OFFICE: 679 E. MARSHALL CT.

M D C DESIGN

TED MANUEL
SCALE
DATE
4/10/22

SITE PLAN
(1 = 300)
(N0T TO SCALE)
510 & 526

LOCATION

SUBJECT
N

VICINITY MAP
(1 = 299)
GENERAL PLAN NOTES:

SUBCONTRACTOR.

4. THE CONTRACTOR AND EACH SUBCONTRACTOR SHALL CAREFULLY EXAMINE THE

TO THE OWNER ANY CONDITION WHICH WOULD PREVENT THE PROPER AND LEGAL COMPLETION OF HIS WORK. NOT REPORTING ANY SUCH UNSUITABLE CONDITION WILL

THIS INCLUDES ERRORS IN THE SPECIFICATIONS AND NOTATIONAL ERRORS

OR WHERE THERE APPEARS TO BE AN ERROR ON THIS DRAWING OR A DISCREPANCY THE CONTRACTOR SHALL MAKE GOOD ANY RESULTING DAMAGE OR DEFECTS.

BETWEEN THE DRAWING AND THE FIELD CONDITIONS, THE OWNER SHALL BE

PROCEEDS WITH THE WORK SO AFFECTED WITHOUT INSTRUCTIONS FROM THE OWNER

5. DO NOT SCALE THIS DRAWING. FIELD VERIFY ALL DIMENSIONS AND JOB CONDITIONS.

3. SHOULD ANY CONDITION ARISE WHERE THE INTENT OF THIS DRAWING IS IN DOUBT

1. INFORMATION SHOWN ON THIS DRAWING DEPICTS TENANT IMPROVEMENT.

2. ALL STRUCTURES, UTILITIES, PARKING AND LANDSCAPING SHOWN, IS EXISTING.

NOTIFIED TO VERIFY CORRECT PROCEDURE TO BE FOLLOWED. IF THE CONTRACTOR ON THE DRAWING WHERE DOUBTFUL OF INTERPRETATION.

CONDITIONS AFFECTING HIS WORK BEFORE PROCEEDING, AND SHALL REPORT

CONSTITUTE ACCEPTANCE OF ALL CONDITIONS BY THE CONTRACTOR AND/OR Site Plan

ADA PARKING

SUSPENDED CEILING DETAILS
A-1

DRAWING INDEX
DRAWINGSHT.#

ADA TOILET ROOMS
ADA -1
SUS CEIL.

DETAILS
2019 CALIFORNIA ELECTRICAL CODE
2019 CALIFORNIA PLUMBING CODE
2019 CALIFORNIA ENERGY CODE
2019 CALIFORNIA GREEN BUILDING

STANDARDS CODE, CAL GREEN
APPLICABLE CODES:
2019 CALIFORNIA BUILDING CODE
2019 CALIFORNIA MECHANICAL CODE

SCOPE OF WORK

REPLACE ALL WINDOWS WITH LOW E
1 2
3 DEMO ALL EXISTING NON-COMPLIANT BATHROOMS
(E) T-BAR CEILING TO REMAIN. DAMAGED T-BAR TO
BE REPAIRED PER ATTACHED DETAILS.
4 MDC
ADA - 2
C
Monterey Ave.

Rebecca St.
planter
entry
sidewalk 6' Iron Gate planterplanter
Alley
60'-0"
20'-0"
21'-0"18'-0"21'-0"
21'-0"18'-0"21'-0"
120'-0"
60'-0"60'-0"
115'-0" 60'-0"
95'-0"
40'-0" 60'-0" 20'-0"
60'-0"60'-0"
B
A
C
526 W. Monterey Ave.
510 W. Monterey Ave.
253 Rebecca St.

APN# - 8340 - 034 - 004
APN# - 8340 - 034 - 009
APN# - 8340 - 034 - 021
APN# - 8340 - 034 - 021
NO

PARKING
FH
FOC
PP
PPtrash
enclosure
Monterey Ave.

Rebecca St.

Cypress St.
8340 - 034 - 009
APN#
A-1
DATA
OCCUPANCY: GROUP B
LOT SIZE = 0.314 ACRES, 13,714 sf
ZONE: POCIND
OWNER

JENARO GARCIA
A CRABB'S SUB OF E 1/2 BLK 159 POMONA TRACT

LEGAL DESCRIPTION
OFFICE: 679 E. MARSHALL CT.

CLAREMONT CA 91711
PROPERTY LOCATION: 510, 526 W. Monterey Rd.

NAME OF OWNER: Jenaro Garcia
DRAWN BY: TED MANUEL
PHONE: 909-262-2033
POMONA CA 91768
TYPE OF CONSTRUCTION: TYPE V-B

NON-SPRINKLERED
OCCUPANT LOAD: 10
CONSTRUCTION TYPE: III-B
AND REDESIGN TO MEET LATEST ADA REQUIREMENTS.

REPLACE ALL NON-COMPLIANT ACCESS DOORS
APN# 8340 - 034 - 021
APN# 8340 - 034 - 004
APN# 8340 - 034 - 009

GOLD CREST INDUSTRIES
PROPERTY LOCATION:
510, 526 W. Monterey Ave.

Pomona CA, 91768
OCCUPANCY GROUPS:

OCC - B: OFFICES
OCC - F1: ASSEMBLY WORK
253 N. Rebecca St.

OCCUPANCY: GROUP F2
OCCUPANT LOAD: 47
CONSTRUCTION TYPE: III-B
(7487 sf)
(5982 sf)
115' P/L
40' P/L
60' P/L
Occupant Load Calculation
60' P/L
120' P/L
120' P/L
60' P/L
60' P/L
95' P/L
60' P/L
60' P/L
F2
SHIPING &H5 RECEIVING
60' P/L
OFFICE
NAME

FACTORY
OCCUPANT AREA sf
(per occupant)
B
TYPE

OCCUPANT
LOAD
AREA
1,538 sf
SEWING

SHIPPING&

RECEIVING

FINISHING

CUTTING
SEWING
TOILET RMS.
518 sf
(e) 10' iron
fence

CUTTING
4,010 sf
250 sf
158 sf
270 sf
248 sf
267 sf
1,210 sf
1,210 sf
NO

PARKING
863 sf
1,724 sf1,763 sf
2,058 sf
9,555 sf
150

ASSEMBLY
WORK
200
N/AN/A
200
10 47
6 (EX OF STS) LOT 1 AND (EX ST) LOT 2
Floor Plan Bldg 510 & 526 W. Monterey (proposed)
A-2e
Elevations (proposed)
(n) BREAK AREA
A-2
A-3 Floor Plan Bldg 526 W. Monterey & 253 N. Rebecca St. (proposed) A-3e
Floor Plan Bldg 510 & 526 W. Monterey (existing)
Floor Plan Bldg 526 W. Monterey & 253 N. Rebecca St. (existing) A-4

ALL NEW WOOD PARTITION WALLS FOR TOILET

ROOMS AND OFFICES SHALL BE CONVENTIONALLY
5 FRAMED AND SUPPORTED PER CODE.
253 N. Rebecca St.

ATTACHMENT NO. 4

← All documents from this meeting