Attachment No. 2 – Original MCE Fully Executed
Agreement
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
BID SHEET A
NON-OCCUPIED MEDIAN, STREETSIDE/ROW AND OTHER LANDSCAPING AND AMENITY MAINTENANCE BID NO:
Prices shall be inclusive of all costs (labor, equipment, materials, training, travel, overhead, insurance, taxes, employee b enefits, ancillary personnel, etc.) expected to be incurred by the CONTRACTOR to fulfill the requirements of this Contract, including returning any areas not currently meeting contract requirements to acceptable condition. Unit prices will prevail.
Contract pricing for each contract year will be in accordance with the most recently published Consumer Price Index (CPI) for the Los Angeles/Long Beach (all urban consumers) Metropolitan Statistical Area issued by the U.S. Department of Labor. Contractors may submit a request to the Parks and Landscape Manager for annual CPI adjustments no later than sixty (60) days prior to the end of the annual contract period for review and approval. No additional fees or surcharges will be allowed beyond the bid prices submitted.
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
1st St. /E Parkways; Section 1
1st St. /E Parkways; Section 2
1st St. /E Parkways; Section 3
1st St. /E Parkways; Section 4
1st St. /E Parkways; Section 5
1st St. /W Parkways; Section 1
1st St. /W Parkways; Section 2
1st St. /W Parkways; Section 3
Albona Pl. Parkway
Alvarado St. /E & Garey Ave. /N Bulbout
Alvarado St. /W & Garey Ave. /N Bulbout
Alvarado St. /W & Park Ave. /N Median
Angela St. Median
172.21 146.38 120.55 103.33 193.74 164.68 135.62 116.24 335.81 285.44 235.07 201.49 377.79 321.12 264.45 226.68 206.66 175.66 144.66 123.99 232.49 197.61 162.74 139.49 206.66 175.66 144.66 123.99 232.49 197.61 162.74 139.49 241.10 204.93 168.77 144.66 271.24 230.55 189.86 162.74 111.94 95.15 78.36 67.16 125.93 107.04 88.15 75.56 154.99 131.74 108.49 92.99 174.37 148.21 122.06 104.62
51.66 43.91 36.16 31.00 58.12 49.40 40.69 34.87 209.78 173.07 146.85 117.48 236.00 194.70 165.21 132.17
6.93 5.89 4.85 4.16 7.79 6.62 5.45 4.67
13.85 11.77 9.70 8.31 15.58 13.24 10.91 9.35
6.93 5.89 4.85 4.16 7.79 6.62 5.45 4.67
16.90 14.03 11.92 9.54 19.01 15.78 13.41 10.73
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Arrow Hwy. /E Backup Walls/Parkways;
Section 1
Arrow Hwy. /E Backup Walls/Parkways;
Section 2
Arrow Hwy. /E Backup Walls/Parkways;
Section 3
Arrow Hwy. /E Backup Walls/Parkways;
Section 4
Arrow Hwy. /E Medians; Section 1
Arrow Hwy. /E Medians; Section 2
Arrow Hwy. /E Medians; Section 3
Arrow Hwy. /E Medians; Section 4
Arrow Hwy. /E Medians; Section 5
Arrow Hwy. /E Medians; Section 6
Arrow Hwy. /E Medians; Section 7
Arrow Hwy. /E Medians; Section 8
Arrow Hwy. /E Medians; Section 9
Arrow Hwy. /E Medians; Section 10
Arrow Hwy. /E Medians; Section 11
Arrow Hwy. /E Medians; Section 12
Arrow Hwy. /E Medians; Section 13
Arrow Hwy. /E Medians; Section 14
Arrow Hwy. /E & Garey Ave. /N Bulbout
Arrow Hwy. /W Backup Walls/Parkways;
Section 1
Arrow Hwy. /W Backup Wall/Parkways;
Section 2
131.70 111.94 92.19 79.02 148.16 125.94 103.71 88.90
12.54 10.66 8.78 7.53 14.11 11.99 9.88 8.47 112.88 95.95 79.02 67.73 126.99 107.95 88.90 76.20 112.88 95.95 79.02 67.73 126.99 107.95 88.90 76.20 125.43 106.61 87.80 75.26 141.10 119.94 98.77 84.66
56.44 47.98 39.51 33.87 63.50 53.97 44.45 38.10
31.36 26.65 21.95 18.81 35.28 29.98 24.69 21.17
56.44 47.98 39.51 33.87 63.50 53.97 44.45 38.10
18.81 15.99 13.17 11.29 21.17 17.99 14.82 12.70
68.98 58.64 48.29 41.39 77.61 65.97 54.33 46.56
25.09 21.32 17.56 15.05 28.22 23.99 19.75 16.93
50.17 42.64 35.12 30.10 56.44 47.98 39.51 33.87
18.81 15.99 13.17 11.29 21.17 17.99 14.82 12.70
56.44 47.98 39.51 33.87 63.50 53.97 44.45 38.10
43.90 37.31 30.73 26.34 49.39 41.98 34.57 29.63
18.81 15.99 13.17 11.29 21.17 17.99 14.82 12.70
18.81 15.99 13.17 11.29 21.17 17.99 14.82 12.70
25.09 21.32 17.56 15.05 28.22 23.99 19.75 16.93
18.80 15.60 13.26 10.61 21.15 17.55 14.92 11.94
12.54 10.66 8.78 7.53 14.11 11.99 9.88 8.47 106.61 90.62 74.63 63.97 119.94 101.95 83.96 71.96
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Arrow Hwy. /W Backup Wall/Parkways;
Section 3
Arrow Hwy. /W & La Verne Ave. /W
Intersection Median
Arrow Hwy. /W Medians; Section 1
Arrow Hwy. /W Medians; Section 2
Arrow Hwy. /W Medians; Section 3
Arrow Hwy. /W Medians; Section 4
Arrow Hwy. /W Medians; Section 5
Arrow Hwy. /W Medians; Section 6
Arrow Hwy. /W Medians; Section 7
Arrow Hwy. /W Medians; Section 8
Arrow Hwy. /W & Garey Ave. /N Bulbout
Berkeley Ave. Median
Berkshire St. Cul-de-sac Circle
Bluegrass Pl. Passthrough
Bonita Ave. /E & Garey Ave. /N Bulbout
Bonita Ave. /W & Garey Ave. /N Bulbout
Brea Canyon Rd. & Mission Blvd. /W
Medians/Parkways; Section 1
Brea Canyon Rd. & Mission Blvd. /W
Medians/Parkways; Section 2
Brea Canyon Rd. & Mission Blvd. /W
Medians/Parkways; Section 3
Burdick Dr. and White Ave. /N Corner Lot
Butterfield Rd./SR-71 Backup
Wall/Parkway East side
37.63 31.98 26.34 22.58 42.33 35.98 29.63 25.40
39.70 32.95 28.01 22.41 44.66 37.07 31.51 25.21 112.88 95.95 79.02 67.73 126.99 107.95 88.90 76.20
12.54 10.66 8.78 7.53 14.11 11.99 9.88 8.47
56.44 47.98 39.51 33.87 63.50 53.97 44.45 38.10
43.90 37.31 30.73 26.34 49.39 41.98 34.57 29.63
31.36 26.65 21.95 18.81 35.28 29.98 24.69 21.17
37.63 31.98 26.34 22.58 42.33 35.98 29.63 25.40
75.26 63.97 52.68 45.15 84.66 71.96 59.26 50.80
25.09 21.32 17.56 15.05 28.22 23.99 19.75 16.93
37.55 31.17 26.49 21.19 42.24 35.06 29.80 23.84
12.54 10.41 8.85 7.08 14.11 11.71 9.95 7.96 137.36 116.76 96.65 77.32 154.53 131.35 108.73 86.99
12.60 10.71 9.10 7.28 14.18 12.05 10.24 8.19
4.22 3.59 2.95 2.53 4.75 4.04 3.32 2.85
4.22 3.59 2.95 2.53 4.75 4.04 3.32 2.85
55.43 47.11 38.80 33.26 62.36 53.00 43.65 37.41
40.14 34.12 28.10 24.08 45.15 38.38 31.61 27.09 349.77 297.30 244.84 209.86 393.49 334.46 275.44 236.09 126.98 104.75 88.88 71.10 142.85 117.84 99.99 79.99
39.78 33.81 27.85 23.87 44.75 38.04 31.33 26.85
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Butterfield Rd./SR-71 Backup
Wall/Parkway West side; Section 1
Butterfield Rd./SR-71 Backup
Wall/Parkway West side; Section 2
Campus Dr. /S Parkways; Section 1
Campus Dr. /S Parkways; Section 2
Campus Dr. /S Parkways; Section 3
Campus Dr. /S Parkways; Section 4
Campus Dr. /S Parkways; Section 5
Campus Dr. /S Parkways; Section 6
Campus Dr. /S Parkways; Section 7
Campus Dr. /S Parkways; Section 8
Campus Dr. /S Parkways; Section 9
Chanslor St. Median
East End Ave. /N Median
East End Ave. /N Underpass; Section 1
East End Ave. /N Underpass; Section 2
East End Ave. /S Median
East End Ave. /S Underpass; Section 1
East End Ave. /S Underpass; Section 2
Elephant Hill ROW
Fairplex Dr. Backup Wall/Parkway;
Section 1
Fairplex Dr. Backup Wall/Parkway;
Section 2
Fairplex Dr. Backup Wall/Parkway;
Section 3
42.19 35.86 29.53 25.32 47.47 40.35 33.23 28.48
6.03 5.12 4.22 3.62 6.78 5.76 4.75 4.07
50.38 42.82 35.27 30.23 56.68 48.18 39.67 34.01 1,571.88 1,336.10 1,100.32 943.13 1,768.37 1,503.11 1,237.86 1,061.02 315.72 268.36 221.00 189.43 355.19 301.91 248.63 213.11
77.25 65.66 54.08 46.35 86.91 73.87 60.83 52.14
16.79 14.27 11.76 10.08 18.89 16.06 13.22 11.34 450.07 382.56 315.05 270.04 506.33 430.38 354.43 303.80
90.69 77.08 63.48 54.41 102.02 86.72 71.41 61.21 433.28 368.28 303.29 259.97 487.44 414.32 341.20 292.46 134.35 114.20 94.04 80.61 151.14 128.47 105.80 90.69
16.90 14.03 11.92 9.54 19.01 15.78 13.41 10.73
29.36 24.95 20.55 17.61 33.03 28.07 23.12 19.82
72.06 61.25 50.44 43.24 81.07 68.91 56.75 48.64
21.35 18.15 14.95 12.81 24.02 20.42 16.81 14.41
10.68 9.07 7.47 6.41 12.01 10.21 8.41 7.21
53.38 45.37 37.36 32.03 60.05 51.04 42.03 36.03
45.37 38.56 31.76 27.22 51.04 43.39 35.73 30.63 309.00 256.47 218.00 174.40 347.63 288.53 245.25 196.20 179.92 152.93 125.94 107.95 202.41 172.05 141.69 121.45 105.84 89.96 74.08 63.50 119.07 101.21 83.35 71.44 148.17 125.94 103.72 88.90 166.69 141.69 116.68 100.01
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Fairplex Dr. Backup Wall/Parkway;
Section 4
Fairplex Dr. Backup Wall/Parkway;
Section 5
Fairplex Dr. Medians; Section 1
Fairplex Dr. Medians; Section 2
Fairplex Dr. Medians; Section 3
Fairplex Dr. Medians; Section 4
Fairplex Dr. Parkways; Section 1
Fairplex Dr. Parkways; Section 2
Fairplex Dr. Parkways; Section 3
Fairplex Dr. Parkways; Section 4
Garey Ave. /N Medians; Section 1 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Medians; Section 2 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Medians; Section 3 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
31.75 26.99 22.23 19.05 35.72 30.36 25.00 21.43
31.75 26.99 22.23 19.05 35.72 30.36 25.00 21.43 243.42 206.91 170.40 146.05 273.85 232.77 191.69 164.31
84.67 71.97 59.27 50.80 95.25 80.96 66.68 57.15
84.67 71.97 59.27 50.80 95.25 80.96 66.68 57.15
52.92 44.98 37.04 31.75 59.53 50.60 41.67 35.72 296.34 251.89 207.44 177.80 333.38 283.38 233.37 200.03 772.60 656.71 540.82 463.56 869.18 738.80 608.42 521.51 550.35 467.79 385.24 330.21 619.14 526.27 433.40 371.48 116.42 98.96 81.49 69.85 130.97 111.33 91.68 78.58
10.55 8.97 7.39 6.33 11.87 10.09 8.31 7.12
23.21 19.73 16.25 13.93 26.11 22.20 18.28 15.67
12.66 10.76 8.86 7.60 14.24 12.11 9.97 8.55
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Garey Ave. /N Medians; Section 4 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Medians; Section 5 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Medians; Section 6 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Medians; Section 7 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Medians; Section 8 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Medians; Section 9 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Medians; Section 10 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
73.86 62.78 51.70 44.31 83.09 70.62 58.16 49.85
37.98 32.29 26.59 22.79 42.73 36.32 29.91 25.64
31.65 26.90 22.16 18.99 35.61 30.27 24.93 21.37
4.22 3.59 2.95 2.53 4.75 4.04 3.32 2.85
16.88 14.35 11.82 10.13 18.99 16.14 13.29 11.39
14.77 12.56 10.34 8.86 16.62 14.12 11.63 9.97
2.11 1.79 1.48 1.27 2.37 2.02 1.66 1.42
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Garey Ave. /N Medians; Section 11 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Medians; Section 12 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Medians; Section 13 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Medians; Section 14 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Medians; Section 15 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Medians; Section 16 - -
Section (III)(W) in Scope of Work;
Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 1 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
8.44 7.17 5.91 5.06 9.50 8.07 6.65 5.70
21.10 17.94 14.77 12.66 23.74 20.18 16.62 14.24
25.32 21.52 17.73 15.19 28.49 24.21 19.94 17.09
14.77 12.56 10.34 8.86 16.62 14.12 11.63 9.97
14.77 12.56 10.34 8.86 16.62 14.12 11.63 9.97
16.88 14.35 11.82 10.13 18.99 16.14 13.29 11.39
2.11 1.79 1.48 1.27 2.37 2.02 1.66 1.42
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Garey Ave. /N Parkways/Treewells;
Section 2 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 3 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 4 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 5 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 6 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 7 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 8 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
16.88 14.35 11.82 10.13 18.99 16.14 13.29 11.39
16.88 14.35 11.82 10.13 18.99 16.14 13.29 11.39
21.10 17.94 14.77 12.66 23.74 20.18 16.62 14.24
21.10 17.94 14.77 12.66 23.74 20.18 16.62 14.24
6.33 5.38 4.43 3.80 7.12 6.05 4.99 4.27
10.55 8.97 7.39 6.33 11.87 10.09 8.31 7.12
4.22 3.59 2.95 2.53 4.75 4.04 3.32 2.85
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Garey Ave. /N Parkways/Treewells;
Section 9 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 10 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 11 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 12 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Av3. /N Parkways/Treewells;
Section 13 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 14 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 15 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
2.11 1.79 1.48 1.27 2.37 2.02 1.66 1.42
4.22 3.59 2.95 2.53 4.75 4.04 3.32 2.85
6.33 5.38 4.43 3.80 7.12 6.05 4.99 4.27
2.11 1.79 1.48 1.27 2.37 2.02 1.66 1.42
2.11 1.79 1.48 1.27 2.37 2.02 1.66 1.42
4.22 3.59 2.95 2.53 4.75 4.04 3.32 2.85
2.11 1.79 1.48 1.27 2.37 2.02 1.66 1.42
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Garey Ave. /N Parkways/Treewells;
Section 16 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 17 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 18 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 19 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 20 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 21 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 22 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
6.33 5.38 4.43 3.80 7.12 6.05 4.99 4.27
6.33 5.38 4.43 3.80 7.12 6.05 4.99 4.27
12.66 10.76 8.86 7.60 14.24 12.11 9.97 8.55
2.11 1.79 1.48 1.27 2.37 2.02 1.66 1.42
16.88 14.35 11.82 10.13 18.99 16.14 13.29 11.39
56.97 48.43 39.88 34.18 64.10 54.48 44.87 38.46
33.76 28.70 23.63 20.26 37.98 32.29 26.59 22.79
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Garey Ave. /N Parkways/Treewells;
Section 23 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 24 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 25 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 26 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 27 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 28 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 29 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
48.53 41.25 33.97 29.12 54.60 46.41 38.22 32.76
27.43 23.32 19.20 16.46 30.86 26.23 21.60 18.52
14.77 12.56 10.34 8.86 16.62 14.12 11.63 9.97
10.55 8.97 7.39 6.33 11.87 10.09 8.31 7.12
25.32 21.52 17.73 15.19 28.49 24.21 19.94 17.09
2.11 1.79 1.48 1.27 2.37 2.02 1.66 1.42
2.11 1.79 1.48 1.27 2.37 2.02 1.66 1.42
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Garey Ave. /N Parkways/Treewells;
Section 30 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 31 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 32 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 33 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 34 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 35 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 36 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
2.11 1.79 1.48 1.27 2.37 2.02 1.66 1.42
21.10 17.94 14.77 12.66 23.74 20.18 16.62 14.24
16.88 14.35 11.82 10.13 18.99 16.14 13.29 11.39
35.87 30.49 25.11 21.52 40.36 34.30 28.25 24.21
31.65 26.90 22.16 18.99 35.61 30.27 24.93 21.37
48.53 41.25 33.97 29.12 54.60 46.41 38.22 32.76
50.64 43.05 35.45 30.39 56.97 48.43 39.88 34.18
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Garey Ave. /N Parkways/Treewells;
Section 37 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 38 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 39 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Parkways/Treewells;
Section 40 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /N Underpass; Section 1
Garey Ave. /N Underpass; Section 2
Garey Ave. /S Medians; Section 1
Garey Ave. /S Medians; Section 2
Garey Ave. /S Medians; Section 3
Garey Ave. /S Medians; Section 4
Garey Ave. /S Medians; Section 5
Garey Ave. /S Medians; Section 6
Garey Ave. /S Medians; Section 7
Garey Ave. /S Medians; Section 8
Garey Ave. /S Medians; Section 9
33.76 28.70 23.63 20.26 37.98 32.29 26.59 22.79
35.87 30.49 25.11 21.52 40.36 34.30 28.25 24.21
8.44 7.17 5.91 5.06 9.50 8.07 6.65 5.70
18.99 16.14 13.29 11.39 21.37 18.16 14.96 12.82
76.65 65.15 53.65 45.99 86.23 73.29 60.36 51.74 153.30 130.30 107.31 91.98 172.46 146.59 120.72 103.47
39.15 33.28 27.41 23.49 44.05 37.44 30.83 26.43
52.20 44.37 36.54 31.32 58.73 49.92 41.11 35.24
65.26 55.47 45.68 39.15 73.41 62.40 51.39 44.05
65.26 55.47 45.68 39.15 73.41 62.40 51.39 44.05
52.20 44.37 36.54 31.32 58.73 49.92 41.11 35.24
39.15 33.28 27.41 23.49 44.05 37.44 30.83 26.43
65.26 55.47 45.68 39.15 73.41 62.40 51.39 44.05
65.26 55.47 45.68 39.15 73.41 62.40 51.39 44.05 104.41 88.75 73.09 62.65 117.46 99.84 82.22 70.48
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Garey Ave. /S Medians; Section 10
Garey Ave. /S Medians; Section 11
Garey Ave. /S Medians; Section 12
Garey Ave. /S Medians; Section 13
Garey Ave. /S Medians; Section 14
Garey Ave. /S Medians; Section 15
Garey Ave. /S Medians; Section 16
Garey Ave. /S Medians; Section 17
Garey Ave. /S Medians; Section 18
Garey Ave. /S Parkways/Treewells;
Section 1 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 2 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 3 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 4 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
130.51 110.94 91.36 78.31 146.83 124.80 102.78 88.10
13.05 11.09 9.14 7.83 14.68 12.48 10.28 8.81
65.26 55.47 45.68 39.15 73.41 62.40 51.39 44.05
65.26 55.47 45.68 39.15 73.41 62.40 51.39 44.05
52.20 44.37 36.54 31.32 58.73 49.92 41.11 35.24 117.46 99.84 82.22 70.48 132.14 112.32 92.50 79.29 195.77 166.40 137.04 117.46 220.24 187.20 154.17 132.14 130.51 110.94 91.36 78.31 146.83 124.80 102.78 88.10 495.95 421.55 347.16 297.57 557.94 474.25 390.56 334.76
2.43 2.07 1.70 1.46 2.74 2.33 1.92 1.64
1.74 1.48 1.22 1.04 1.96 1.66 1.37 1.17
2.09 1.77 1.46 1.25 2.35 1.99 1.64 1.41
2.43 2.07 1.70 1.46 2.74 2.33 1.92 1.64
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Garey Ave. /S Parkways/Treewells;
Section 5 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 6 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 7 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 8 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 9 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 10 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 11 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
1.39 1.18 0.97 0.83 1.56 1.33 1.10 0.94
1.39 1.18 0.97 0.83 1.56 1.33 1.10 0.94
2.78 2.36 1.95 1.67 3.13 2.66 2.19 1.88
1.39 1.18 0.97 0.83 1.56 1.33 1.10 0.94
1.04 0.89 0.73 0.63 1.17 1.00 0.82 0.70
0.35 0.30 0.24 0.21 0.39 0.33 0.27 0.23
2.78 2.36 1.95 1.67 3.13 2.66 2.19 1.88
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Garey Ave. /S Parkways/Treewells;
Section 12 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 13 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 14 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 15 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 16 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 17 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 18 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
2.43 2.07 1.70 1.46 2.74 2.33 1.92 1.64
2.09 1.77 1.46 1.25 2.35 1.99 1.64 1.41
3.82 3.25 2.68 2.29 4.30 3.66 3.01 2.58
6.61 5.61 4.62 3.96 7.43 6.32 5.20 4.46
14.60 12.41 10.22 8.76 16.43 13.96 11.50 9.86
14.60 12.41 10.22 8.76 16.43 13.96 11.50 9.86
5.22 4.43 3.65 3.13 5.87 4.99 4.11 3.52
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Garey Ave. /S Parkways/Treewells;
Section 19 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 20 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 21 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 22 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 23 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 24 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 25 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
7.30 6.21 5.11 4.38 8.21 6.98 5.75 4.93
17.38 14.78 12.17 10.43 19.56 16.62 13.69 11.73
6.26 5.32 4.38 3.75 7.04 5.98 4.93 4.22
6.26 5.32 4.38 3.75 7.04 5.98 4.93 4.22
13.91 11.82 9.73 8.34 15.65 13.30 10.95 9.39
14.25 12.12 9.98 8.55 16.04 13.63 11.23 9.62
14.95 12.71 10.46 8.97 16.82 14.30 11.77 10.09
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Garey Ave. /S Parkways/Treewells;
Section 26 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 27 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 28 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Parkways/Treewells;
Section 29 - - Section (III)(W) in Scope of
Work; Attachment D – Garey Avenue
Maintenance Plan
Garey Ave. /S Underpass; Section 1
Garey Ave. /S Underpass; Section 2
Gordon St. /N Cul-de-sac
Holt Ave. /E Median
Holt Ave. /W Median
Humane Way Overpass; Section 1
Humane Way Overpass; Section 2
Humane Way Overpass; Section 3
Humane Way Overpass; Section 4
Humane Way Overpass; Section 5
Lexington Ave. /W Backup Wall/Parkway
12.17 10.34 8.52 7.30 13.69 11.64 9.58 8.21
24.68 20.98 17.28 14.81 27.77 23.60 19.44 16.66
15.30 13.00 10.71 9.18 17.21 14.63 12.05 10.33
8.69 7.39 6.08 5.22 9.78 8.31 6.84 5.87 111.49 94.76 78.04 66.89 125.42 106.61 87.80 75.25 139.36 118.46 97.55 83.62 156.78 133.26 109.75 94.07
86.80 72.04 61.24 48.99 97.65 81.05 68.89 55.11
67.03 55.30 46.92 37.54 75.41 62.21 52.79 42.23 208.97 172.40 146.28 117.02 235.09 193.95 164.57 131.65 337.35 286.75 236.15 202.41 379.52 322.60 265.67 227.71
85.29 72.49 59.70 51.17 95.95 81.55 67.16 57.57 128.88 109.55 90.21 77.33 144.99 123.24 101.49 86.99 128.88 109.55 90.21 77.33 144.99 123.24 101.49 86.99
77.71 66.05 54.39 46.62 87.42 74.31 61.19 52.45 548.83 452.79 384.18 307.34 617.43 509.39 432.20 345.76
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Mills Ave. /N Backup Wall/Parkways;
Section 1
Mills Ave. /N Backup Wall/Parkways;
Section 2
Mission Blvd. /E Median
Mission Blvd. /E Parkways/Treewells;
Section 1
Mission Blvd. /E Parkways/Treewells;
Section 2
Mission Blvd. /E Parkways/Treewells;
Section 3
Mission Blvd. /E Parkways/Treewells;
Section 4
Mission Blvd. /E Parkways/Treewells;
Section 5
Mission Blvd. /E Parkways/Treewells;
Section 6
Mission Blvd. /E Parkways/Treewells;
Section 7
Mission Blvd. /E Parkways/Treewells;
Section 8
Mission Blvd. /E Parkways/Treewells;
Section 9
Mission Blvd. /E Parkways/Treewells;
Section 10
Mission Blvd. /E Parkways/Treewells;
Section 11
26.53 22.55 18.57 15.92 29.85 25.37 20.89 17.91
42.64 36.24 29.85 25.58 47.97 40.77 33.58 28.78 150.56 127.98 105.39 90.34 169.38 143.97 118.57 101.63
0.50 0.42 0.35 0.30 0.56 0.47 0.39 0.33
1.98 1.69 1.39 1.19 2.23 1.90 1.56 1.34
1.98 1.69 1.39 1.19 2.23 1.90 1.56 1.34
0.50 0.42 0.35 0.30 0.56 0.47 0.39 0.33
1.49 1.26 1.04 0.89 1.67 1.42 1.17 1.00
0.50 0.42 0.35 0.30 0.56 0.47 0.39 0.33
1.49 1.26 1.04 0.89 1.67 1.42 1.17 1.00
0.99 0.84 0.69 0.60 1.12 0.95 0.78 0.67
1.49 1.26 1.04 0.89 1.67 1.42 1.17 1.00
1.98 1.69 1.39 1.19 2.23 1.90 1.56 1.34
1.98 1.69 1.39 1.19 2.23 1.90 1.56 1.34
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Mission Blvd. /E Parkways/Treewells;
Section 12
Mission Blvd. /E Parkways/Treewells;
Section 13
Mission Blvd. /E Parkways/Treewells;
Section 14
Mission Blvd. /E Parkways/Treewells;
Section 15
Mission Blvd. /E Parkways/Treewells;
Section 16
Mission Blvd. /E Parkways/Treewells;
Section 17
Mission Blvd. /E Parkways/Treewells;
Section 18
Mission Blvd. /E Parkways/Treewells;
Section 19
Mission Blvd. /E Parkways/Treewells;
Section 20
Mission Blvd. /E Parkways/Treewells;
Section 21
Mission Blvd. /E Parkways/Treewells;
Section 22
Mission Blvd. /E Parkways/Treewells;
Section 23
Mission Blvd. /E Parkways/Treewells;
Section 24
2.48 2.11 1.74 1.49 2.79 2.37 1.95 1.67
4.46 3.79 3.12 2.68 5.02 4.27 3.52 3.01
3.97 3.37 2.78 2.38 4.46 3.79 3.12 2.68
5.46 4.64 3.82 3.27 6.14 5.22 4.30 3.68
3.97 3.37 2.78 2.38 4.46 3.79 3.12 2.68
6.45 5.48 4.51 3.87 7.25 6.17 5.08 4.35
3.47 2.95 2.43 2.08 3.91 3.32 2.73 2.34
11.41 9.70 7.99 6.84 12.83 10.91 8.98 7.70
6.94 5.90 4.86 4.17 7.81 6.64 5.47 4.69
4.46 3.79 3.12 2.68 5.02 4.27 3.52 3.01
8.43 7.17 5.90 5.06 9.49 8.06 6.64 5.69
14.88 12.65 10.42 8.93 16.74 14.23 11.72 10.04
18.35 15.60 12.85 11.01 20.65 17.55 14.45 12.39
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Mission Blvd. /E Parkways/Treewells;
Section 25
Mission Blvd. /E Parkways/Treewells;
Section 26
Mission Blvd. /W Backup Wall/Parkway
Mission Blvd. /W Medians; Section 1
Mission Blvd. /W Medians; Section 2
Mission Blvd. /W Medians; Section 3
Mission Blvd. /W Parkways/Treewells;
Section 1
Mission Blvd. /W Parkways/Treewells;
Section 2
Mission Blvd. /W Parkways/Treewells;
Section 3
Mission Blvd. /W Parkways/Treewells;
Section 4
Mission Blvd. /W Parkways/Treewells;
Section 5
Mission Blvd. /W Parkways/Treewells;
Section 6
Mission Blvd. /W Parkways/Treewells;
Section 7
Mission Blvd. /W Parkways/Treewells;
Section 8
Mission Blvd. /W Parkways/Treewells;
Section 9
6.45 5.48 4.51 3.87 7.25 6.17 5.08 4.35
9.92 8.43 6.94 5.95 11.16 9.49 7.81 6.70
33.79 28.05 23.84 19.07 38.01 31.55 26.82 21.45
62.22 51.33 43.55 34.84 69.99 57.74 49.00 39.20
77.77 64.16 54.44 43.55 87.49 72.18 61.25 49.00 217.76 179.65 152.44 121.95 244.98 202.11 171.49 137.19
0.50 0.42 0.35 0.30 0.56 0.47 0.39 0.33
6.94 5.90 4.86 4.17 7.81 6.64 5.47 4.69
1.49 1.26 1.04 0.89 1.67 1.42 1.17 1.00
0.99 0.84 0.69 0.60 1.12 0.95 0.78 0.67
1.98 1.69 1.39 1.19 2.23 1.90 1.56 1.34
2.98 2.53 2.08 1.79 3.35 2.85 2.34 2.01
2.98 2.53 2.08 1.79 3.35 2.85 2.34 2.01
2.48 2.11 1.74 1.49 2.79 2.37 1.95 1.67
5.46 4.64 3.82 3.27 6.14 5.22 4.30 3.68
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Mission Blvd. /W Parkways/Treewells;
Section 10
Mission Blvd. /W Parkways/Treewells;
Section 11
Mission Blvd. /W Parkways/Treewells;
Section 12
Mission Blvd. /W Parkways/Treewells;
Section 13
Mission Blvd. /W Parkways/Treewells;
Section 14
Mission Blvd. /W Parkways/Treewells;
Section 15
Mission Blvd. /W Parkways/Treewells;
Section 16
Mission Blvd. /W Parkways/Treewells;
Section 17
Mission Blvd. /W Parkways/Treewells;
Section 18
Monroe St./Orange Grove Ave. /N Cul-de-
sac
Mount Vernon Ave. Parkway
Murchison Ave./I-10 Backup
Wall/Parkway; Section 1
Murchison Ave./I-10 Backup
Wall/Parkway; Section 2
Murchison Ave./Farringdon Ave. Backup
Wall/Parkway; Section 1
6.45 5.48 4.51 3.87 7.25 6.17 5.08 4.35
5.46 4.64 3.82 3.27 6.14 5.22 4.30 3.68
5.46 4.64 3.82 3.27 6.14 5.22 4.30 3.68
4.96 4.22 3.47 2.98 5.58 4.74 3.91 3.35
6.94 5.90 4.86 4.17 7.81 6.64 5.47 4.69
5.46 4.64 3.82 3.27 6.14 5.22 4.30 3.68
13.89 11.80 9.72 8.33 15.62 13.28 10.94 9.37
6.45 5.48 4.51 3.87 7.25 6.17 5.08 4.35
31.40 26.06 22.15 17.72 35.33 29.32 24.92 19.94
13.39 11.38 9.37 8.04 15.07 12.81 10.55 9.04 257.12 213.41 181.40 145.12 289.26 240.09 204.07 163.26
58.89 50.06 41.22 35.33 66.25 56.31 46.38 39.75
93.41 79.40 65.39 56.05 105.09 89.32 73.56 63.05 155.34 132.04 108.74 93.21 174.76 148.55 122.33 104.86
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Murchison Ave./Farringdon Ave. Backup
Wall/Parkway; Section 2
Orange Grove Ave. /N Backup
Wall/Parkway
Philadelphia St. /E Backup Wall/Parkway;
Section 1
Philadelphia St. /E Backup Wall/Parkway;
Section 2
Phillips Blvd. /W Median
Phillips Dr. & SR-71 Backup Wall/Open
Space
Phillips Ranch Road Median
Phillilps Ranch Rd. @ Scenic Ridge Dr.
Parkway
Queen Anne’s Walk Cul-de-sac Circle
Reservoir St. /N Median
Reservoir St. /N Underpass; Section 1
Reservoir St. /N Underpass; Section 2
Reservoir St. /N Underpass; Section 3
Reservoir St. /S Medians; Section 1
Reservoir St. /S Medians; Section 2
Reservoir St. /S Medians; Section 3
Reservoir St. /S Medians; Section 4
Reservoir St. /S Medians; Section 5
Reservoir St. /S Medians; Section 6
Reservoir St. /S Backup Wall/Parkway
Reservoir St. /S Underpass; Section 1
110.96 94.31 77.67 66.58 124.83 106.10 87.38 74.90 130.54 108.35 92.10 73.68 146.86 121.89 103.61 82.89
19.35 16.45 13.54 11.61 21.77 18.50 15.24 13.06
22.76 19.35 15.93 13.66 25.61 21.77 17.93 15.36
13.05 11.09 9.14 7.31 14.68 12.48 10.28 8.22 161.98 134.44 114.28 91.42 182.23 151.25 128.56 102.85
15.00 12.45 10.50 8.40 16.88 14.01 11.81 9.45
11.61 9.87 8.13 6.97 13.06 11.10 9.14 7.84 142.25 120.91 99.57 85.35 160.03 136.02 112.02 96.02 119.02 101.17 83.32 71.41 133.90 113.82 93.73 80.34
92.90 78.96 65.03 55.74 104.51 88.83 73.16 62.70
8.71 7.40 6.10 5.23 9.80 8.33 6.86 5.88
20.32 17.27 14.22 12.19 22.86 19.43 16.00 13.72
23.22 19.74 16.26 13.93 26.13 22.21 18.29 15.68
40.64 34.55 28.45 24.39 45.72 38.86 32.01 27.43
26.13 22.21 18.29 15.68 29.39 24.98 20.58 17.64
11.61 9.87 8.13 6.97 13.06 11.10 9.14 7.84
20.32 17.27 14.22 12.19 22.86 19.43 16.00 13.72
81.28 69.09 56.90 48.77 91.44 77.73 64.01 54.87
13.05 11.09 9.14 7.31 14.68 12.48 10.28 8.22
45.47 37.74 32.08 25.66 51.15 42.46 36.09 28.87
30.95 25.69 21.84 17.47 34.82 28.90 24.56 19.65
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Reservoir St. /S Underpass; Section 2
Ridgeway St. Backup Wall/Parkway;
Section 1
Ridgeway St. Backup Wall/Parkway;
Section 2
Ridgeway St. Backup Wall/Parkway;
Section 3
Ridgeway St. Backup Wall/Parkway;
Section 4
Rio Rancho Rd. and Auto Center Dr.
Parkways; Section 1
Rio Rancho Rd. and Auto Center Dr.
Parkways; Section 2
Rio Rancho Rd. and Auto Center Dr.
Parkways; Section 3
Rio Rancho Rd. and Auto Center Dr.
Parkways; Section 4
Rio Rancho Rd. and Auto Center Dr.
Parkways; Section 5
Rio Rancho Rd. and Auto Center Dr.
Parkways; Section 6
Rio Rancho Rd. and Auto Center Dr.
Parkways; Section 7
Rio Rancho Rd. Easement
Rio Rancho Rd. Medians; Section 1
Rio Rancho Rd. Medians; Section 2
Rio Rancho Rd. Medians; Section 3
40.64 34.55 28.45 24.39 45.72 38.86 32.01 27.43
9.10 7.74 6.37 5.46 10.24 8.71 7.17 6.15
33.01 28.05 23.10 19.80 37.13 31.56 25.99 22.28
5.69 4.84 3.98 3.41 6.40 5.44 4.48 3.84
37.56 31.92 26.29 22.53 42.25 35.91 29.58 25.35 128.30 109.06 89.81 76.98 144.34 122.69 101.04 86.60
38.49 32.72 26.94 23.09 43.30 36.81 30.31 25.98 115.47 98.15 80.83 69.28 129.90 110.42 90.93 77.94
38.49 32.72 26.94 23.09 43.30 36.81 30.31 25.98
51.32 43.62 35.92 30.79 57.74 49.07 40.41 34.64
64.15 54.53 44.91 38.49 72.17 61.34 50.52 43.30
51.32 43.62 35.92 30.79 57.74 49.07 40.41 34.64 195.43 166.12 136.80 117.26 219.86 186.88 153.90 131.92
47.56 40.42 33.29 28.53 53.50 45.47 37.45 32.10
35.18 29.90 24.62 21.11 39.57 33.64 27.70 23.74
37.13 31.56 25.99 22.28 41.77 35.51 29.24 25.06
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Rio Rancho Rd. Medians; Section 4
Rio Rancho Rd. Medians; Section 5
Rio Rancho Rd. Medians; Section 6
Rio Rancho Rd. Medians; Section 7
Rio Rancho Rd. Backup Wall/Parkway;
Section 1
Rio Rancho Rd. Backup Wall/Parkway;
Section 2
Rio Rancho Rd. Backup Wall/Parkway;
Section 3
Riverside Dr. Parkway/Slope
San Antonio Ave. /N Median
San Antonio /N Parkway/Backup Wall
San Bernardino Ave. Median/Parkway
Sharon Dr. Parkway
Storrs Pl. Pass-through
Temple Ave. Medians; Section 1
Temple Ave. Medians; Section 2
Temple Ave. Medians; Section 3
Temple Ave. Medians; Section 4
Temple Ave. Medians; Section 5
Temple Ave. Medians; Section 6
Temple Ave. Medians; Section 7
Temple Ave. Medians; Section 8
Temple Ave. Medians; Section 9
Thomas St. /N Parkways; Section 1
Thomas St. /N Parkways; Section 2
40.39 34.33 28.27 24.23 45.44 38.62 31.81 27.26
68.40 58.14 47.88 41.04 76.95 65.41 53.87 46.17
26.06 22.15 18.24 15.63 29.31 24.92 20.52 17.59
27.36 23.26 19.15 16.42 30.78 26.16 21.55 18.47
65.14 55.37 45.60 39.09 73.29 62.29 51.30 43.97
68.40 58.14 47.88 41.04 76.95 65.41 53.87 46.17
40.39 34.33 28.27 24.23 45.44 38.62 31.81 27.26 251.14 208.45 177.18 141.74 282.53 234.50 199.33 159.46
9.87 8.39 6.91 5.92 11.10 9.44 7.77 6.66
49.33 41.93 34.53 29.60 55.50 47.18 38.85 33.30 277.02 228.54 193.91 155.13 311.65 257.11 218.15 174.52
69.11 57.01 48.38 38.70 77.75 64.14 54.43 43.54
31.90 26.48 22.51 18.00 35.89 29.79 25.32 20.25
31.52 26.79 22.06 18.91 35.46 30.14 24.82 21.27
23.64 20.09 16.55 14.18 26.59 22.60 18.61 15.95
47.27 40.18 33.09 28.36 53.18 45.21 37.23 31.91
78.79 66.97 55.15 47.27 88.64 75.34 62.05 53.18
15.76 13.39 11.03 9.45 17.73 15.07 12.41 10.64
23.64 20.09 16.55 14.18 26.59 22.60 18.61 15.95 149.70 127.24 104.79 89.82 168.41 143.15 117.89 101.05 110.30 93.76 77.21 66.18 124.09 105.48 86.87 74.46 102.43 87.06 71.70 61.46 115.23 97.94 80.66 69.14
16.37 13.91 11.46 9.82 18.42 15.65 12.89 11.05
16.37 13.91 11.46 9.82 18.42 15.65 12.89 11.05
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Towne Ave. /N Medians; Section 1
Towne Ave. /N Medians; Section 2
Towne Ave. /N Medians; Section 3
Towne Ave. /N Medians; Section 4
Towne Ave. /N Medians; Section 5
Towne Ave. /N Medians; Section 6
Towne Ave. /N Medians; Section 7
Towne Ave. /N Medians; Section 8
Towne Ave. /N Medians; Section 9
Towne Ave. /N Medians; Section 10
Towne Ave. /N Parkways; Section 1
Towne Ave. /N Parkways; Section 2
Towne Ave. /N Parkways; Section 3
Towne Ave. /N Parkways; Section 4
Towne Ave. /N Parkways; Section 5
Towne Ave. /N Underpass; Section 1
Towne Ave. /N Underpass; Section 2
Towne Ave. /S Medians; Section 1
Towne Ave. /S Medians; Section 2
Towne Ave. /S Medians; Section 3
Towne Ave. /S Medians; Section 4
Towne Ave. /S Backup Wall/Parkway;
Section 1
Towne Ave. /S Backup Wall/Parkway;
Section 2
Towne Ave. /S Backup Wall/Parkway;
Section 3
21.88 18.59 15.31 13.13 24.61 20.92 17.23 14.77
82.03 69.73 57.42 49.22 92.29 78.44 64.60 55.37
27.34 23.24 19.14 16.41 30.76 26.15 21.53 18.46
65.63 55.78 45.94 39.38 73.83 62.75 51.68 44.30 153.13 130.16 107.19 91.88 172.27 146.43 120.59 103.36 147.66 125.51 103.36 88.60 166.12 141.20 116.28 99.67
16.41 13.95 11.48 9.84 18.46 15.69 12.92 11.07
65.63 55.78 45.94 39.38 73.83 62.75 51.68 44.30
49.22 41.84 34.45 29.53 55.37 47.07 38.76 33.22
32.81 27.89 22.97 19.69 36.91 31.38 25.84 22.15
54.69 46.49 38.28 32.81 61.52 52.30 43.07 36.91 366.41 311.45 256.49 219.85 412.21 350.38 288.55 247.33 366.41 311.45 256.49 219.85 412.21 350.38 288.55 247.33 251.57 213.83 176.10 150.94 283.01 240.56 198.11 169.81
87.50 74.38 61.25 52.50 98.44 83.67 68.91 59.06 256.11 217.69 179.28 153.67 288.13 244.91 201.69 172.88 148.27 126.03 103.79 88.96 166.81 141.79 116.77 100.09 142.92 121.49 100.05 85.75 160.79 136.67 112.55 96.47 111.16 94.49 77.81 66.70 125.06 106.30 87.54 75.04
31.76 27.00 22.23 19.06 35.73 30.37 25.01 21.44 148.22 125.99 103.75 88.93 166.75 141.73 116.72 100.05 153.51 130.48 107.46 92.11 172.70 146.80 120.89 103.62
79.40 67.49 55.58 47.64 89.33 75.93 62.53 53.60
47.64 40.50 33.35 28.58 53.60 45.56 37.52 32.16
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
Towne Ave. /S Backup Wall/Parkway;
Section 4
Towne Ave. /S Underpass; Section 1
Towne Ave. /S Underpass; Section 2
Valley Blvd. Medians; Section 1
Valley Blvd. Backup Wall/Parkway;
Section 1
Valley Blvd. Backup Wall/Parkway;
Section 2
Valley Blvd. Backup Wall/Parkway;
Section 3
Valley Blvd. Backup Wall/Parkway;
Section 4
Valley Blvd. Backup Wall/Parkway;
Section 5
Valley Blvd. Medians; Section 2
Valley Blvd. Medians; Section 3
Valley Blvd. Medians; Section 4
Valley Blvd. Medians; Section 5
Valley Blvd. Medians; Section 6
Valley Blvd. Medians; Section 7
Valley Blvd. Medians; Section 8
Valley Blvd. Medians; Section 9
Valley Blvd. Medians; Section 10
Valley Blvd. Median/Parkway; Section 1
Valley Blvd. Median/Parkway; Section 2
Valley Blvd. Parkway
26.47 22.50 18.53 15.88 29.78 25.31 20.84 17.87
40.44 34.37 28.31 24.26 45.49 38.67 31.85 27.30 134.80 114.58 94.36 80.88 151.64 128.90 106.15 90.99
2.28 1.93 1.59 1.37 2.56 2.18 1.79 1.54
30.73 26.12 21.51 18.44 34.57 29.38 24.20 20.74
54.63 46.43 38.24 32.78 61.46 52.24 43.02 36.87
36.42 30.96 25.49 21.85 40.97 34.83 28.68 24.58
13.66 11.61 9.56 8.19 15.36 13.06 10.76 9.22
10.24 8.71 7.17 6.15 11.52 9.79 8.07 6.91
7.97 6.77 5.58 4.78 8.96 7.62 6.27 5.38
3.96 3.29 2.79 2.24 4.46 3.70 3.14 2.52
17.82 14.79 12.58 10.06 20.05 16.64 14.15 11.32
0.99 0.82 0.70 0.56 1.11 0.92 0.79 0.63
5.94 4.93 4.19 3.35 6.68 5.55 4.72 3.77
42.58 35.34 30.04 24.03 47.90 39.76 33.80 27.04
3.96 3.29 2.79 2.24 4.46 3.70 3.14 2.52
1.98 1.64 1.40 1.12 2.23 1.85 1.57 1.26
1.98 1.64 1.40 1.12 2.23 1.85 1.57 1.26
46.31 39.37 32.42 27.79 52.10 44.29 36.47 31.26
7.13 6.06 4.99 4.28 8.02 6.81 5.61 4.81 113.57 94.26 80.12 64.10 127.77 106.05 90.14 72.11
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
White Ave. /N Backup Wall/Parkway;
Section 1
White Ave. /N Backup Wall/Parkway;
Section 2
White Ave. /N Backup Wall/Parkway;
Section 3
White Ave. /N Backup Wall/Parkway;
Section 4
White Ave. /N Backup Wall/Parkway;
Section 5
White Ave. /N Backup Wall/Parkway;
Section 6
White Ave. /N Backup Wall/Parkway;
Section 7
White Ave. /N Backup Wall/Parkway;
Section 8
White Ave. /N Medians; Section 1
White Ave. /N Medians; Section 2
White Ave. /N Medians; Section 3
White Ave. /N Medians; Section 4
White Ave. /N Medians; Section 5
White Ave. /N Medians; Section 6
White Ave. /N Medians; Section 7
White Ave. /N Medians; Section 8
White Ave. /N Medians; Section 9
White Ave. /N Medians; Section 10
White Ave. /N Medians; Section 11
159.74 135.78 111.82 95.85 179.71 152.76 125.80 107.83 159.74 135.78 111.82 95.85 179.71 152.76 125.80 107.83 139.13 118.26 97.39 83.48 156.52 133.05 109.57 93.91 149.44 127.02 104.61 89.66 168.12 142.90 117.68 100.87 139.13 118.26 97.39 83.48 156.52 133.05 109.57 93.91 314.34 267.19 220.04 188.60 353.63 300.58 247.54 212.18 139.13 118.26 97.39 83.48 156.52 133.05 109.57 93.91
97.91 83.22 68.54 58.74 110.15 93.62 77.10 66.09
30.92 26.28 21.64 18.55 34.78 29.57 24.35 20.87
10.31 8.76 7.21 6.18 11.59 9.86 8.12 6.96
46.38 39.42 32.46 27.83 52.17 44.35 36.52 31.30
46.38 39.42 32.46 27.83 52.17 44.35 36.52 31.30 262.81 223.38 183.96 157.68 295.66 251.31 206.96 177.39
20.61 17.52 14.43 12.37 23.19 19.71 16.23 13.91
56.68 48.18 39.68 34.01 63.77 54.20 44.64 38.26 123.67 105.12 86.57 74.20 139.13 118.26 97.39 83.48 139.13 118.26 97.39 83.48 156.52 133.05 109.57 93.91 154.59 131.40 108.21 92.75 173.92 147.83 121.74 104.35
87.60 74.46 61.32 52.56 98.55 83.77 68.99 59.13
City of Pomona – Request for Bid
Non-Occupied Median, Streetside/ROW and Other Landscaping and Amenity Maintenance, Bid No:
Locations
Standard/
Frequency
Level A
Per Month
Frequency
Level B
Per
Month
Frequency
Level C
Per
Month
Frequency
Level D
Per
Month
Frequency
Level A w/
only
organic
pesticides
Per Month
Frequency
Level B w/
only
organic
pesticides
Per Month
Frequency
Level C w/
only
organic
pesticides
Per Month
Frequency
Level D
w/ only
organic
pesticides
Per
Month
White Ave. /N Parkway (1055 White Ave.
/N
White Ave. /N Underpass; Section 1
White Ave. /N Underpass; Section 2
White Ave. /S Backup Wall/Parkway
White Ave. /S Median
White Ave. /S Underpass
White Ave. /S Underpass
Windsor Pl. Cul-de-sac Circle
Additional Staffing North and South
Garey Medians, Parkways, and Tree Wells
– Section (III)(U) in Scope of Work
20.61 17.52 14.43 12.37 23.19 19.71 16.23 13.91 172.72 146.81 120.90 103.63 194.31 165.16 136.02 116.59 191.23 162.54 133.86 114.74 215.13 182.86 150.59 129.08
61.84 52.56 43.29 37.10 69.57 59.13 48.70 41.74
25.77 21.90 18.04 15.46 28.99 24.64 20.29 17.39
98.70 83.89 69.09 59.22 111.03 94.38 77.72 66.62 111.03 94.38 77.72 66.62 124.91 106.18 87.44 74.95
31.40 26.06 22.15 17.72 35.33 29.32 24.92 19.94 10,601.70 7,323.54 2,999.16 -
City of Pomona
NON-OCCUPIED MEDIAN, STREETSIDE/ROW AND OTHER LANDSCAPING AND AMENITY MAINTENANCE, Bid No:2020-37
BID SHEET B
NON-OCCUPIED MEDIAN, STREETSIDE/ROW AND OTHER LANDSCAPING AND AMENITY
MAINTENANCE
BID NO: 2020-37
Prices on Bid Sheet B will not be used in the award of the RFB. Prices shall be inclusive of all costs (labor, equipment, materials, training, travel, overhead, insurance, taxes, employee benefits, ancillary personnel, etc.) expected to be incurred by the CONTRACTOR to fulfill the requirements of this Contract. Unit prices will prevail.
Contract pricing for each contract year will be in accordance with the most recently published Consumer Price Index (CPI) for the Los Angeles/Long Beach (all urban consumers) Metropolitan Statistical Area issued by the U.S. Department of Labor. Contractors may submit a request to the Parks and Landscape Manager for annua l CPI adjustments no later than sixty (60) days prior to the end of the annual contract period for review and approval. No additional fees or surcharges will be allowed beyond the bid prices submitted.
Additional Optional Services Unit
1. Hourly Cost for Additional Labor w/o
vehicle $ _______ Per Hour
2. Hourly Cost for Additional Labor w/
vehicle $ _______ Per Hour
3. Hourly Cost for Irrigation Specialist
w/o vehicle $ _______ Per Hour
4. Hourly Cost for Irrigation Specialist
w/ vehicle $ _______ Per Hour
5. Hourly Cost for Additional Supervisor
w/o vehicle $ _______ Per Hour
6. Hourly Cost for Additional Supervisor
w/ vehicle $ _______ Per Hour
7. Mow, Edge, and Trim Turf $ _______ Per Sq. Ft.
8. Tall Fescue Sod Installation (Materials
& Labor) $ _______ Per Sq. Ft.
9. Two (2)-inch Depth Sanitized (weed
and pest free) Shredded Wood Mulch
Installation (Materials & Labor)
$ _______ Per Sq. Ft.
10. Two (2)-inch Depth, ¼-inch diameter
grain-size, natural/non-stabilized
Decomposed Granite Installation
(Materials & Labor)
$ _______ Per Sq. Ft.
11. 50/50 Tall Fescue and Perennial Rye
Seeding (Materials & Labor) $ _______ Per Sq. Ft.
12. Weed Abatement Only (Section III(T)
in Scope of Work) $ _______ Per Sq. Ft.
13. Weed Abatement + Brush Clearing
(Section III(U) in Scope of Work) $ _______ Per Sq. Ft.
14. Unit Cost to Test and Certify Backflow
Prevention Assemblies $ _______ Per Device
City of Pomona
NON-OCCUPIED MEDIAN, STREETSIDE/ROW AND OTHER LANDSCAPING AND AMENITY MAINTENANCE, Bid No:2020-37
Garey Ave Green Street Maintenance
All Maintenance shall occur annually prior to wet season (Oct-May) South Garey SR 60 to Grand Ave.
Vegetated median.
North bound- 123 Tree wells with permeable pavement.
South bound- 151 Tree wells with permeable pavement.
North Garey Aliso St. to Foothill Blvd.
Vegetated median with infiltration trench.
North bound- 151 Tree wells with permeable pavement.
South bound- 174 Tree wells with permeable pavement.
Permeable Pavement Maintenance
Pervious concrete or asphalt is an open void material designed to allow rainwater to filter through the paved surface into the ground rather than settling on the surface. It’s two main objectives are runoff peak flow attenuation while providing stormwater treatment.
General Maintenance The primary goal of porous pavement maintenance is to prevent the pavement surface and/or the underlying infiltration bed from being clogged with fine sediments. To keep the system clean throughout the year and prolong its lifespan, the pavement surface should be vacuumed with a commercial cleaning unit.
Planted areas adjacent to porous pavement should be well maintained to prevent soil washout onto the pavement. If any washout does occur it should be cleaned off the pavement immediately to prevent further clogging of the pores.
Furthermore, if any bare spots or eroded areas are observed within the planted areas, they should be replanted and/or stabilized at once. Planted areas should be inspected on an annual basis. All trash and other litter that is observed during these inspections should be removed.
Vacuuming
Vacuuming porous asphalt and concrete pavement with a vacuum sweeper. Combinations of washing and vacuuming techniques have proved effective in cleaning both organic clogging as well as sandy clogging. Maintenance crews are encouraged to determine the most effective strategy of cleaning their porous installations.
For smaller installations, such as sidewalks, plazas, or small parking lots, “walk behind” vacuum units may prove most effective. If “walk behind” units are used, it is recommended that the scrub pressure be kept relatively low. The dirtiest areas may need to be power washed after scrubbing to get out the dirt that has been deeply ground in.
Tree Well Maintenance
Trees placed in urban areas along the street provide environmental benefits. The tree’s canopy intercepts stormwater and the soil absorbs additional runoff and allow for infiltration.
Annual routine tree maintenance actions (e.g., pruning, watering young trees). Dead or diseased tree: Remove dead or diseased tree. Replace per original plans. Standing water in tree well for longer than 24 hours following a storm event:
Loosen or replace soils surrounding the tree to restore drainage. Presence of mosquitos/larvae: Disperse any standing water from the tree well to nearby landscaping. Loosen or replace soils surrounding the tree to restore drainage (and prevent standing water). Accumulation of sediment in Tree Well Surface Ponding Area should be periodically removed to prevent clogging and to promote healthy trees without excessive sediment build up near the base. Trash and debris build up inlet or surface ponding areas: remove trash and debris.
Infiltration Trench Maintenance
Infiltration basins are designed to remove pollutants from stormwater runoff and reduce runoff volume through infiltration. Maintenance is required and is extremely important. Sediment and debris must be removed regularly to maintain correct function.
Annually clean basin. Remove any sediment, trash and debris. Remove any dead vegetation, trim live vegetation if needed and remove weeds. Replace dead plants/vegetation. Manage native vegetation (if applicable) through mowing, spot spraying for weeds and/or prescribed burning. Water as needed.
Irrigation Maintenance
Annually inspect irrigation equipment for broken equipment, watering targets vegetation, and eliminate over watering.
Maintenance Matrix.
Garey Ave Green Street Maintenance -Inspection Annually (prior to wet season) Permeable Pavement Maintenance -sweep sediment and debris
Annually (prior to wet season)
-Vacuum As needed
Tree Well Maintenance -Pruning Once every two years.
-Weed abatement
-Trash/debris removal
-Loosen/replace/remove sediment
-Replace dead trees
Annually (prior to wet season)
Infiltration Trench Maintenance -Weed abatement
-Trash/debris removal
-Replace dead vegetation
-Manage vegetation
Annually (prior to wet season)
Irrigation Maintenance -Inspect equipment
-Repair equipment
-Target plants for watering
-Eliminate over water
-Eliminate overspray
Annually (prior to wet season)