SGV Forward
Pomona City Council
October 19, 2026
Attachment No. 2
Project Background
In 2021, SGVCOG & Metro initiated a Feasibility Study to identify high-quality transit near the SR-60 Corridor Conducted community outreach, PDT meetings, and coordination with cities Mid-Term Plan (2035)
Long-Term Plan (2050)
Jump Start Projects (2028)
Fall 2025 – Spring 2026 Conducted planning activities, community outreach, and conceptual engineering for Jump Start Projects March 2024 – Presented Final Feasibility Study
Receive direction from Pomona City Council
Project Limits
Curb and Side Running
Atlantic Boulevard
W 1st St to Garvey Ave
Curb and Side Running
Monterey Park
Garvey Avenue
Atlantic Blvd to New Ave
Side Running
Monterey Park
Garvey Avenue
New Ave to Rosemead
Side Running
Rosemead
Garvey Avenue
Rosemead Blvd to Santa Anita Ave
Side Running
South El Monte / El Monte
Valley Boulevard
San Angelo Ave to Proctor Ave
Curb Running
City of Industry / County of LA
Holt Avenue
Fairplex Dr To Main St
Side Running
Pomona
Project Components
The “Jump Start Projects” are demonstration projects that can be implemented under a shorter timeframe (before 2028). The following three key components focus on improving transit reliability, speed, and the rider experience:
Dedicated peak-hour bus lanes
Signing and striping improvements within existing street width Transit signal priority (TSP)
Minor traffic signal equipment upgrades, TSP implemented through a cloud-based technology Transit shelter upgrades
Pre-fabricated structures and amenities in existing right-of-way to improve the rider experience
Typical Bus Lane Cross Sections
PRESERVES PARKING
Side-Running Configuration
Curb-Running Configuration
PRESERVES TRAVEL LANES
Transit Signal Priority (TSP)
Benefits of TSP:
Establishes better on-time bus service and reliability
Provides opportunity for emergency vehicle preemption
Increases vehicle throughput on bus corridors
Improves air quality by reducing unnecessary stopping
Bus Stop Amenities
Dedicated Bus Lane Benefits
Dedicated bus lanes can improve bus speed and reliability by reducing travel times by 10-25% (NACTO) Transit signal priority can improve travel speed and reliability by up to 10% (USDOT) 15-Minute Weekday Frequencies:Line 486: 4:30am to 6:00pmSilver Streak: 5:00am to 7:30pm Corridor Services:Line 486
Silver Streak – Line 707
Line 197
Source: Foothill Transit
Line 486 and Silver Streak are Foothill transit’s highest ridership lines and part of the high-frequency network
Person Carrying Capacity
75 PEOPLE IN 63 CARS
75 PEOPLE IN ONE LINE 70 BUS
Schools & Colleges Served
schools served
150
students
170,000
+
Mid-Term BRT (2035)
Segment 6 (2028)
schools served
20 students
11,000
Foothill Transit Survey & Demographics
Out of 5,543 Surveyed Riders in Spring 2026:
didn’t have access to a car
77%
are from low-income households (<$30,000 a year)
60%
ride at least4x a week
66%
travelled for work or school
71%
Are 18 to 64 years of age
82%
Have been riding Foothill Transit for 3 years or longer 54%
3 Peak hours only: During designated times, the lane is reserved for buses and cyclists except for right-turning vehicles Designated area for cyclists: Provides a designated riding space for cyclists instead of using the general travel lanes.
Bus operations: Buses may move into the adjacent travel lane to pass cyclists.
Parking: Vehicles would be able to access the on-street parking by crossing the bus/bike lane.
Peak Hour Dedicated Bus Lane Operations
Alignment with Local Plans
Pomona Complete Streets Project:
Includes quick build treatment on Orange Grove Ave from Garey Ave to White Ave Implementation scheduled for October 2026
Six-month trial period
Advances quick build multimodal solutions in the City
West Valley Connector:
19-mile BRT service with service between Rancho Cucamonga and Downtown Pomona
3.5-mile dedicated center-running bus lane along Holt Blvd in Ontario Creates high-quality transit corridor, projected to reduce travel time for OmniTrans riders by 30% Source: West Valley Connector (BRT), SBCTA 2026
Holt Avenue Corridor Improvements:
Improved aesthetics and safety on Holt Avenue
New medians, landscaping, and street furniture
Demonstrates investments on Holt Avenue
Bike Path Expansion on Valley:
Protected two-way bike lane along Valley Boulevard (Temple Avenue to Humane Way) Bike lanes terminate near proposed bus lane, providing first/last mile connections Alignment with Local Plans
Source: Streetsblog LA, photo by Joe Linton
Source: HRGreen
Conceptual Engineering Plan
Key Outreach Events
Oct. 16, 2025 – Monterey Park Monster Mash
Nov. 2, 2025 – South El Monte / El Monte Open Streets Event Nov. 5, 2025 – Pomona Community Meeting
Nov. 10 & 13, 2025 – Garvey Avenue Improvements Project Community Meetings Nov. 17, 2025 – El Monte / South El Monte Meeting
Jan. 26, 2026 – Monterey Park Meeting
Jan. 28, 2026 – Rosemead Meeting
Jan. 31, 2026 – Monterey Park Lunar New Year
Feb. 26, 2026 – Pomona ACTS Community Event
May 23, 2026 – Rosemead Youth Multi-Cultural Day
Community Meetings and Pop-Up Events
Next Steps*
*Pending concurrence on project improvements from City Council
Thank you!