Cities Index.
Agenda packet

Port Hueneme City Council
December 16, 2024

Document
Agenda packet
Meeting
December 16, 2024
Body
Port Hueneme City Council
Pages
17
Original file
9.2 MB
Text extracted from the city's file for reading and search. Open the original on porthuenemeca.suiteonemedia.com. That file is the official record.

CC Regular Meeting Agenda – December 16, 2024, Page 1 of 5 Monday, December 16, 2024
Port Hueneme City Hall
250 North Ventura Road, Port Hueneme, CA 93041
6:30 PM
Watch Meetings Live or On-Demand
Official City Page: https://porthuenemeca.suiteonemedia.com YouTube: https://www.youtube.com/@cityofporthuenemegov
Public Comments
Public comments may be submitted in person or in writing.

In-Person: Complete a speaker request card located at the entrance of the Council Chamber and give it to the City Clerk. Your name will be called when it is your turn to speak. Public Comment is limited to 3 minutes per speaker, unless for good cause, the Mayor amends the time limit. A speaker’s time may not be transferred to another speaker.

Written: All written public comments shall be no more than 500 words and are subject to the Public Records Act. Written comments should be submitted to the City Clerk by 5:00 p.m. on the day of the City Council meeting by email or directly to the City Clerk’s Office. Email [email protected] and enter “City Council Public Comment” in the Subject line (and agenda item number if applicable). Mail or drop off written comments to the City Clerk’s Office located at 250 N. Ventura Road, Port Hueneme, CA 93041. Please clearly mark envelope with “Public Comment and meeting date”.

Translation Services
Use of a Translator
* The City shall provide a translator if one is requested by a member of the public with a 48-hour advance notice. If a 48-hour advance notice is not provided, the member of the public may provide their own translator. To request a translator, please contact [email protected]. * Per California Government Code 54954.3, if an individual utilizes a translator during Public Statements, the legislative body of a local agency shall provide at least twice the allotted time to a member of the public who utilizes a translator to ensure that non-English speakers receive the same opportunity to directly address the legislative body of a local agency.
* If the City provides a translator or translation equipment that allows for the simultaneous translation of the testimony, then no additional time shall be granted.

Uso de traductor
* La Ciudad proporcionará un traductor si un miembro del público lo solicita con un aviso de 48 horas de anticipación. Si no se avisa con 48 horas de anticipación, el público podrá proporcionar su propio traductor.

Para solicitar un traductor, comuníquese con [email protected].

CC Regular Meeting Agenda – December 16, 2024, Page 2 of 5 * Según el Código de Gobierno de California 54954.3, si una persona utiliza un traductor durante las declaraciones públicas, el cuerpo legislativo de una agencia local deberá proporcionar al menos el doble del tiempo asignado a un miembro del público que utilice un traductor para garantizar que las personas que no hablan inglés reciban la misma oportunidad de dirigirse directamente al cuerpo legislativo de una agencia local.
* Si la Ciudad proporciona un traductor o equipo de traducción que permita la traducción simultánea del testimonio, entonces no se concederá tiempo adicional.

Americans with Disabilities Act
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, contact the office of the city clerk at (805) 986-6503 or [email protected]. Notice 48 hours prior to the meeting will enable the city to make reasonable arrangements to allow participation in this meeting.

Levine Act Disclaimer
The Levine Act (Gov. Code, § 84308) requires any Party, Participant, or Agent in a Proceeding, as those terms are defined in Government Code section 84308 and Title 2, California Code of Regulations, Sections 18400 et seq., before the City of Port Hueneme that involves any action or consideration to their contract, license, permit, or other entitlement for use to disclose any campaign contributions made to City elected or appointed Officers totaling more than $250 within the 12 months prior to the City decision. Any City elected or appointed Officer who has received a contribution totaling more than $250 within the preceding twelve (12) months from a Party, Agent, or Participant, shall disclose that fact on the record of the proceeding and shall not make, participate in making, or in any way attempt to use the Officer’s official position to influence the decision. Violations of Government Code section 84308 may result in a civil action brought by the FPPC for an amount up to five thousand dollars ($5,000) per violation. Any person who knowingly or willfully violates any provision of the Political Reform Act is guilty of a misdemeanor and subject to a fine of up to the greater of ten thousand dollars ($10,000) or three times the amount the person unlawfully contributed upon conviction for each violation. Any Party, Participant, or Agent is further prohibited from making, and any elected or appointed City Officer is prohibited from soliciting or accepting, any contribution in excess of $250 for a period of twelve (12) months following any proceeding described above. 6:30 PM CITY COUNCIL REGULAR MEETING AGENDA

CALL TO ORDER / FLAG SALUTE

ROLL CALL
Councilmembers Steven A. Gama, Laura D. Hernandez, Roberto “Bobby” Martinez; Mayor Pro Tem Martha R. McQueen-Legohn; and Mayor Misty Perez

INSPIRATION
Given by Mayor Perez

PUBLIC COMMENT
Members of the public may submit comments for items on the Agenda or that is within the subject matter jurisdiction of the City Council. General public comments regarding items Not on the Agenda will be heard at this time. State law prohibits Council from taking action on any item Not on the Agenda. Comments regarding items on the Agenda will be heard when the item is addressed. In-person public comments should be no more than 3 minutes in length. Written comments should be no more than 500 words. Please see Agenda cover page for submission instructions.

AGENDA APPROVAL FOR CITY COUNCIL

CITY COUNCIL AGENDA
Recommendation: Approve the City Council Agenda of December 16, 2024.

CONFLICT OF INTEREST and LEVINE ACT DISCLOSURES
CC Regular Meeting Agenda – December 16, 2024, Page 3 of 5

STATE OF THE CITY

1. STATE OF THE CITY 2024 PRESENTATION BY MAYOR MISTY PEREZ

ELECTION RESULTS

2. DECLARING RESULTS OF THE NOVEMBER 5, 2024 MUNICIPAL GENERAL

ELECTION
Recommendation: Adopt a Resolution reciting the fact of the Municipal General Election held November 5, 2024 declaring the result and declaring such other matters as provided by law.

PRESENTATIONS

3. HONOR AND RECOGNIZE OUTGOING 2024 COUNCILMEMBER BOBBY MARTINEZ

4. HONOR AND RECOGNIZE OUTGOING 2024 MAYOR PRO TEM MARTHA MCQUEENLEGOHN

5. HONOR AND RECOGNIZE OUTGOING 2024 MAYOR MISTY PEREZ

INSTALLATION OF OFFICERS

6. OATHS OF OFFICE AND INTRODUCTIONS FOR NEWLY-ELECTED

COUNCILMEMBERS
• Misty Perez
• Jesus “Jess” Lopez

RECESS THE CITY COUNCIL REGULAR MEETING

RECONVENE THE CITY COUNCIL REGULAR MEETING

COUNCIL REORGANIZATION

7. ELECTION OF MAYOR

8. ELECTION OF MAYOR PRO TEM

CONSENT CALENDAR
All matters listed on the Consent Calendar are to be considered routine by the governing body, and will be enacted by one motion in the form listed. There will be no discussion of these items unless, before the governing body votes on the motion to adopt, specific items are removed from the Consent Calendar for separate motions.

9. MINUTES
Recommendation: Approve the December 2, 2024, City Council Regular Meeting Minutes.

10. REGISTER OF DISBURSEMENTS
Recommendation: Receive and file the City’s register of disbursements for the period of November 25, 2024 through December 8, 2024.

11. AUTHORIZATION FOR THE CITY MANAGER TO SIGN A LETTER OF INTENT TO

PARTICIPATE IN THE COUNTY OF VENTURA MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN UPDATE 2027
Recommendation: Authorize the City Manager to sign the Letter of Intent to participate in the County of Ventura Multi-Jurisdictional Hazard Mitigation Plan (MJHMP) Update 2027.

CC Regular Meeting Agenda – December 16, 2024, Page 4 of 5

PUBLIC HEARINGS

12. ADOPT A RESOLUTION GRANTING SPECIAL USE PERMIT NO. 12-24 TO ALLOW STEPHEN CAMPBELL, ON BEHALF OF THE FAMILIES OF ALASKA FLIGHT 261 TO HOST THE ALASKA FLIGHT 261 25TH ANNIVERSARY MEMORIAL EVENT AND FIND

THE EVENT EXEMPT FROM CEQA
Recommendation:

1. Open the public hearing to take testimonial and documentary evidence; and

2. Close the public hearing and consider the evidence; and

3. Approve the Waiver of Fees associated with the event; and

4. Adopt a Resolution approving Special Use Permit No. 12-24 (Alaska Flight 261 25th Anniversary Memorial Event); and

4. Find the project (Special Use Permit No. 12-24) to be categorically exempt from CEQA; and

5. Take such additional, related, action that may be desirable.

13. INTRODUCTION OF AN ORDINANCE TO ADD SECTIONS 10590-10594 TO CHAPTER 4 OF ARTICLE X OF THE PORT HUENEME MUNICIPAL CODE, AS THEY RELATE TO

RESIDENTIAL NEIGHBORHOOD INFILL OVERLAY STANDARDS, AND TO APPROVE

THE ADDENDUM TO THE ENVIRONMENTAL IMPACT REPORT PREVIOUSLY

PREPARED FOR THE GENERAL PLAN UPDATE PROJECT
Recommendation:

1. Open the public hearing to take testimonial and documentary evidence; and

2. Close the public hearing and consider the evidence; and

3. Introduce for first reading, by title only, waiving further reading of an Ordinance entitled, “An Ordinance of the City Council of the City of Port Hueneme, California to add Sections 10590-10594 to Chapter 4 of Article X of the Port Hueneme Municipal Code, as they relate to residential Neighborhood Infill Overlay Standards, adding the Neighborhood Infill Overlay zoning designation to certain properties, and repealing the West End Specific Plan; and

4. Approve the Addendum to the Environmental Impact Report that was previously prepared for the Port Hueneme General Plan Update project (State Clearinghouse [SCH] # 2021040164); and

5. Take such additional, related, action that may be desirable.

14. INTRODUCTION OF AN ORDINANCE APPROVING THE FOLLOWING AMENDMENTS TO ARTICLE X OF THE PORT HUENEME MUNICIPAL CODE: SECTION 10353 REGARDING ADMINISTRATIVE PERMITS; SECTION 10355 REGARDING TEMPORARY USE AND SPECIAL EVENT PERMITS; SECTIONS 10481 AND 10482

REGARDING PERMITTED AND CONDITIONALLY PERMITTED USES IN THE GENERAL COMMERCIAL (C-1) ZONE; AND ADDING SECTIONS 10290-10295

REGARDING STANDARDS FOR ALCOHOL BEVERAGE SALES AND TOBACCO RETAILER ESTABLISHMENTS; AND TO FIND THE PROJECT EXEMPT FROM CEQA (PROJECT NO. PHZ-24-4)
Recommendation:

1. Open the public hearing to take testimonial and documentary evidence; and

2. Close the public hearing and consider the evidence; and

3. Introduce for first reading, by title only, waiving further reading of an Ordinance entitled, “An Ordinance of the City Council of the City of Port Hueneme, California amending the following Sections of the Port Hueneme Municipal Code, Article X: 10353 as it relates to Administrative Permits; 10355, related to temporary uses; 10481 and 10482, related to land uses permitted or conditionally permitted in the General Commercial (C-1) zone, respectively; and to add new Sections 10290-10295, related to standards for alcohol beverage sales establishments and tobacco retailers”; and

4. Find the project to be categorically exempt from CEQA; and

5. Take such additional, related, action that may be desirable.

CC Regular Meeting Agenda – December 16, 2024, Page 5 of 5 BUSINESS ITEMS – None.

CITY MANAGER COMMENTS AND REPORTS
COUNCILMEMBERS’ REPORTS AND COMMENTS
Council Members are appointed to various Regional Committees/Agencies/Boards and will report out on their activities within these organizations and put forth any comments in regards to community events at this time.

REQUEST FOR FUTURE AGENDA ITEMS
Councilmembers may request items to be placed on future agendas at this time. All requested items will require a motion, a second, and a majority vote, per adopted Council policies, to be placed on a future agenda and will be scheduled at the City Manager’s discretion.

ADJOURNMENT
The City Council will adjourn to its next regular meeting scheduled for Monday, January 6, 2025, at 6:30 p.m.
_____________________________________________________________________________________________ Copies of staff reports or other written documentation relating to each item of business referred to in this Agenda are available for public inspection in the Office of the City Clerk and on the City’s website at www.cityofporthueneme.org. Materials received after agenda packet distributions are made available to the public on the City’s website and in the City Clerk’s office at the same time they are provided to the Council.

I, Georgianna Nicole Alvarez, City Clerk of the City of Port Hueneme, do hereby affirm that the agenda was posted at least 72 hours in advance of the meeting on the City’s website and near the front entrance of Port Hueneme City Hall, 250 N. Ventura Road, Port Hueneme, California, 93041, in accordance with California Government Code Section 54954.2(a).

THIS IS A PRESENTATION ITEM ONLY
Agenda Item No. 01 Page 1 of 1 CC Agenda 12-16-2024
DATE: December 16, 2024
TO: Honorable City Council
FROM: James Vega, City Manager
Georgianna N. Alvarez, City Clerk
SUBJECT: DECLARING RESULTS OF THE NOVEMBER 5, 2024 MUNICIPAL

GENERAL ELECTION
RECOMMENDATION:

It is recommended that the City Council adopt a resolution reciting the fact of the Municipal General Election held November 5, 2024, declaring the result and declaring such other matters as provided by law.

BACKGROUND/ANALYSIS:

On May 20, 2024, the City Council adopted Resolution No. 4487 calling and giving notice of a Municipal General Election to be held on November 5, 2024, for the purpose of electing two members of the City Council for full terms of four years. During the nomination period six candidates qualified to be placed on the ballot.

Per Elections Code Section 10263(b), for a consolidated election, the governing body shall meet at its usual place of meeting no later than the next regularly-scheduled City Council meeting following presentation of the 28-day canvass of the returns, or at a special meeting called for this purpose to declare the results and to install the newlyelected officers.

On December 5, 2024, the Ventura County Clerk Recorder certified the Canvass of Votes Cast. The certified results of the election confirm that Misty Perez and Jesus (Jess) Lopez were the two successful candidates for the Port Hueneme City Council.

It is therefore recommended that City Council adopt the attached Resolution reciting the fact of the Municipal General Election held November 5, 2024, declaring the result and declaring such other matters as provided by law.

Following Council adoption of the Resolution, the newly elected Councilmembers will be administered the Oath of Office and will be formally seated. At that time, the Agenda Item No. 02 Page 1 of 6 CC Agenda 12-16-2024
November 5, 2024 Election Results
December 16, 2024

Page 2 ends

Councilmembers will officially begin their four-year terms and will be immediately authorized to conduct city business.

FISCAL IMPACT:

None.

ATTACHMENTS:

A. Resolution including Exhibit A: County of Ventura Certified Election Results Agenda Item No. 02 Page 2 of 6 CC Agenda 12-16-2024
RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT HUENEME,

CALIFORNIA, RECITING THE FACT OF THE MUNICIPAL GENERAL
ELECTION HELD NOVEMBER 5, 2024, DECLARING THE RESULT, AND

DECLARING SUCH OTHER MATTERS AS PROVIDED BY LAW
WHEREAS, a Municipal General Election (consolidated with the Statewide General Election) was held and conducted in the City of Port Hueneme, California, on Tuesday, November 5, 2024, as required by law; and
WHEREAS, notice of the election was given in the time, form, and manner as provided by law; voting precincts were properly established; election officers were appointed; and, in all respects, the election was held and conducted and the votes were cast, received and canvassed, and the returns made and declared in the time, form, and manner as required by the Elections Code of the State of California for the holding elections; and WHEREAS, the County Clerk canvassed the returns of the election and has certified the results to this City Council in accordance with Elections Code §§ 10264 and 15372, and the results are received, attached and made a part hereof as “Exhibit A.”

NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF PORT HUENEME, CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1: The whole number of votes cast in the precincts, except by vote by mail voter ballots, was 1346. The whole number of votes by mail voter ballots cast in the City was 6158, making a total of 7,504 votes cast in the City of Port Hueneme.

SECTION 2: The names of persons voted for at the election for Members of the City Council are as follows:

CITY COUNCIL QUALIFIED CANDIDATES
Thomas Fiala
Jesus (Jess) Lopez
Randall Thomas
Lamont L. Hayes
Luis Mendez II
Misty Perez
SECTION 3: That the number of votes given at each precinct and in the City to each of the persons named above for the office for which the persons were candidates is listed in the attached certified results from the County of Ventura as “Exhibit A.” SECTION 4: The City Council declares and determines that Misty Perez and Jesus (Jess) Lopez were elected as Members of the City Council for full four-year terms as a result of the election.

SECTION 5: The City Clerk is directed to enter in the City’s records a statement of the results of the election, showing: (1) the whole number of votes (ballots) cast in the City; (2) the names of the persons voted for; (3) for what office each person was voted for; (4) the total number of votes given at each precinct to each person; and (5) the total number of votes given in the City to each person.

Attachment A
Agenda Item No. 02 Page 3 of 6 CC Agenda 12-16-2024
SECTION 6: The City Clerk will immediately make and deliver to each of the persons so elected a Certificate of Election signed by the City Clerk and authenticated. The City Clerk will also administer to each person elected the Oath of Office prescribed in the Constitution of the State of California and will have them subscribe to it and file it in the office of the City Clerk. Each of the persons so elected will then be inducted into the respective office to which they have been elected.

SECTION 7: This Resolution will become effective immediately upon adoption, and the City Clerk will certify to the passage and adoption of this Resolution and enter it into the book of original resolutions.

PASSED, APPROVED AND ADOPTED this 16
th day of December, 2024.

Misty Perez
Mayor
ATTEST:
________________________________
Georgianna Nicole Alvarez
City Clerk
Agenda Item No. 02 Page 4 of 6 CC Agenda 12-16-2024

CERTIFICATION

STATE OF CALIFORNIA )
COUNTY OF VENTURA ) SS.

CITY OF PORT HUENEME )
I, Georgianna Nicole Alvarez, City Clerk of the City of Port Hueneme, California, do hereby certify that the foregoing Resolution No. ____ was duly adopted at the regular meeting of the City Council on the __ day of ____, 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Dated:

Georgianna Nicole Alvarez
City Clerk
Agenda Item No. 02 Page 5 of 6 CC Agenda 12-16-2024

CERTIFICATE OF THE COUNTY CLERK
(Elections Code Sections 15372 (a) and 10264)
City of Port Hueneme
General Municipal Election
November 5, 2024

STATE OF CALIFORNIA)
SS.

COUNTY OF VENTURA J
I, MICHELLE ASCENCION, Clerk-Recorder & Registrar of Voters of the County of Ventura, State of California, do hereby certify that the attached is a true and correct Canvass of the Votes Cast for all the candidates for the two offices of Member of the City Council at the City of Port Hueneme General Municipal Election consolidated with the General Election held on November 5, 2024.

I further certify that the total ballots cast at the City of Port Hueneme General Municipal Election are as follows:

VOTE CENTER

BALLOTS CAST
1,346

VOTE BY MAIL

BALLOTS CAST
6,158
TOTAL

BALLOTS CAST
7,504
I further certify that the total votes cast for the two offices of Member of the City Council are as follows:

MEMBER OF THE

CITY COUNCIL

VOTE CENTER
VOTE

VOTE BY MAIL
VOTE
TOTAL
VOTE
THOMAS FIALA 300 1,382 1,682
JESUS (JESS) LOPEZ 393 1,639 2,032
RANDALL THOMAS 250 1,098 1,348
LAMONT L. HAYES 114 690 804
LUIS MENDEZ II 245 880 1,125
MISTY PEREZ 343 2,390 2,733
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal this 5th day of December 2024.

MICFlELLE ASCENCION, MMC, CERA, REO
Clerk-Recorder & Registrar of Voters
County of Ventura
Exhibit A
Agenda Item No. 02 Page 6 of 6 CC Agenda 12-16-2024

THIS IS A PRESENTATION ITEM ONLY
Agenda Item No. 03 Page 1 of 1 CC Agenda 12-16-2024

THIS IS A PRESENTATION ITEM ONLY
Agenda Item No. 04 Page 1 of 1 CC Agenda 12-16-2024

THIS IS A PRESENTATION ITEM ONLY
Agenda Item No. 05 Page 1 of 1 CC Agenda 12-16-2024

THIS IS A PRESENTATION ITEM ONLY
Agenda Item No. 06 Page 1 of 1 CC Agenda 12-16-2024

THIS IS A PRESENTATION ITEM ONLY
Agenda Item No. 07 Page 1 of 1 CC Agenda 12-16-2024

THIS IS A PRESENTATION ITEM ONLY
Agenda Item No. 08 Page 1 of 1 CC Agenda 12-16-2024
CC & HA Regular Meeting Agenda – December 2, 2024, Page 1 of 8 Monday, December 2, 2024
Port Hueneme City Hall
250 North Ventura Road, Port Hueneme, CA 93041
6:30 PM
Watch Meetings Live or On-Demand
Official City Page: https://porthuenemeca.suiteonemedia.com YouTube: https://www.youtube.com/@cityofporthuenemegov
Public Comments
Public comments may be submitted in person or in writing.

In-Person: Complete a speaker request card located at the entrance of the Council Chamber and give it to the City/Authority Clerk. Your name will be called when it is your turn to speak. Public comment is limited to 3 minutes per speaker, unless for good cause, the Mayor amends the time limit. A speaker’s time may not be transferred to another speaker.

Written: All written public comments should be no more than 500 words and are subject to the Public Records Act. Written comments should be submitted to the City/Authority Clerk by 5:00 p.m. on the day of the City Council/Housing Authority meeting by email or directly to the City/Authority Clerk’s Office. Email [email protected] and enter “City Council (or Housing Authority) Public Comment” in the Subject line (and agenda item number if applicable). Mail or drop off written comments to the City/Authority Clerk’s Office located at 250 N. Ventura Road, Port Hueneme, CA 93041. Please clearly mark envelope with “City Council (or Housing Authority) Public Comment and meeting date”.

Translation Services
Use of a Translator
* The City shall provide a translator if one is requested by a member of the public with a 48-hour advance notice. If a 48-hour advance notice is not provided, the member of the public may provide their own translator. To request a translator, please contact [email protected]. * Per California Government Code 54954.3, if an individual utilizes a translator during Public Statements, the legislative body of a local agency shall provide at least twice the allotted time to a member of the public who utilizes a translator to ensure that non-English speakers receive the same opportunity to directly address the legislative body of a local agency.
* If the City provides a translator or translation equipment that allows for the simultaneous translation of the testimony, then no additional time shall be granted.

Uso de traductor
* La Ciudad proporcionará un traductor si un miembro del público lo solicita con un aviso de 48 horas de anticipación. Si no se avisa con 48 horas de anticipación, el público podrá proporcionar su propio traductor.

Para solicitar un traductor, comuníquese con [email protected].

Agenda Item No. 9 Page 1 of 8 CC Agenda 12-16-2024
CC & HA Regular Meeting Agenda – December 2, 2024, Page 2 of 8 * Según el Código de Gobierno de California 54954.3, si una persona utiliza un traductor durante las declaraciones públicas, el cuerpo legislativo de una agencia local deberá proporcionar al menos el doble del tiempo asignado a un miembro del público que utilice un traductor para garantizar que las personas que no hablan inglés reciban la misma oportunidad de dirigirse directamente al cuerpo legislativo de una agencia local.
* Si la Ciudad proporciona un traductor o equipo de traducción que permita la traducción simultánea del testimonio, entonces no se concederá tiempo adicional.

Americans with Disabilities Act
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, contact the office of the city clerk at (805) 986-6503 or [email protected]. Notice 48 hours prior to the meeting will enable the city to make reasonable arrangements to allow participation in this meeting.

Levine Act Disclaimer
The Levine Act (Gov. Code, § 84308) requires any Party, Participant, or Agent in a Proceeding, as those terms are defined in Government Code section 84308 and Title 2, California Code of Regulations, Sections 18400 et seq., before the City of Port Hueneme that involves any action or consideration to their contract, license, permit, or other entitlement for use to disclose any campaign contributions made to City elected or appointed Officers totaling more than $250 within the 12 months prior to the City decision. Any City elected or appointed Officer who has received a contribution totaling more than $250 within the preceding twelve (12) months from a Party, Agent, or Participant, shall disclose that fact on the record of the proceeding and shall not make, participate in making, or in any way attempt to use the Officer’s official position to influence the decision. Violations of Government Code section 84308 may result in a civil action brought by the FPPC for an amount up to five thousand dollars ($5,000) per violation. Any person who knowingly or willfully violates any provision of the Political Reform Act is guilty of a misdemeanor and subject to a fine of up to the greater of ten thousand dollars ($10,000) or three times the amount the person unlawfully contributed upon conviction for each violation. Any Party, Participant, or Agent is further prohibited from making, and any elected or appointed City Officer is prohibited from soliciting or accepting, any contribution in excess of $250 for a period of twelve (12) months following any proceeding described above. 6:30 P.M. CITY COUNCIL REGULAR MEETING AGENDA

CALL TO ORDER / FLAG SALUTE
Mayor Perez called the meeting to order at 6:30 p.m. and led the flag salute.

ROLL CALL

Present: Councilmembers Steven A. Gama, Laura D. Hernandez, Roberto “Bobby” Martinez; Mayor Pro Tem Martha R. McQueen-Legohn; Mayor Misty Perez

Absent: None

INSPIRATION
Given by Councilmember Martinez

PUBLIC COMMENT
Public comments were provided in person by the following:
• Julie Tumamait-Stenslie
• KC Rodriguez
• David Scrivner
• Jan Berk
• Tamah Figg
Public comments were submitted via email and read by City Clerk Georgianna Alvarez by the following:
• Jeffrey Scarberry
Agenda Item No. 9 Page 2 of 8 CC Agenda 12-16-2024
CC & HA Regular Meeting Agenda – December 2, 2024, Page 3 of 8

AGENDA APPROVAL FOR CITY COUNCIL

CITY COUNCIL AGENDA
A motion was made by Councilmember Gama, seconded by Councilmember Martinez, and passed unanimously to approve the City Council Agenda of December 2, 2024.

CONFLICT OF INTEREST and LEVINE ACT DISCLOSURES – None.

RECESS THE CITY COUNCIL MEETNG AND CALL TO ORDER THE HOUSING AUTHORITY

REGULAR MEETING
Mayor/Chair Perez recessed the City Council Meeting and called to order the Housing Authority Regular meeting at 6:51 p.m.

ROLL CALL

Present: Port Hueneme Housing Authority Members Robert Blackwell, Steven A. Gama, Laura D. Hernandez, and Roberto “Bobby” Martinez; Vice Chair Martha R. McQueen-Legohn, and Chair Misty Perez

Absent: Port Hueneme Housing Authority Member Johnny Brown HOUSING AUTHORITY PUBLIC COMMENT – None.

HOUSING AUTHORITY CONSENT CALENDAR
A motion was made by Member Hernandez, seconded by Member Martinez to approve the Consent Calendar Nos. 1 – 2, as presented.

Motion passed 6-0-1 as follows:

AYES: Blackwell, Gama, Hernandez, Martinez, McQueen-Legohn, Perez NOES: None; ABSENT: Brown; ABSTAIN: None
Authority Members:

1. MINUTES
Approved the October 7, 2024, Housing Authority Regular Meeting Minutes.

2. REGISTER OF DISBURSEMENTS
Received and filed the Housing Authority’s register of disbursements for the period of September 30, 2024 through November 24, 2024.

HOUSING AUTHORITY BUSINESS ITEMS

3. AUTHORIZATION FOR OUT OF STATE TRAVEL
Recommendation: Authorize out of state travel for the Finance Senior Accountant to attend the Housing Authority Everything You Need to Know 2024 seminar in Las Vegas, Nevada, from December 4-5, 2024.

Executive Director James Vega presented the staff report. There were no public comments.

A motion was made by Member Martinez, seconded by Member Hernandez, to authorize out of state travel for the Finance Senior Accountant to attend the Housing Authority Everything You Need to Know 2024 seminar in Las Vegas, Nevada, from December 4-5, 2024.

Agenda Item No. 9 Page 3 of 8 CC Agenda 12-16-2024
CC & HA Regular Meeting Agenda – December 2, 2024, Page 4 of 8 Motion passed 6-0-1 as follows:

AYES: Blackwell, Gama, Hernandez, Martinez, McQueen-Legohn, Perez NOES: None; ABSENT: Brown; ABSTAIN: None
AUTHORITY MEMBERS’ REPORTS, COMMENTS, & REQUESTS FOR FUTURE AGENDA ITEMS – None.

ADJOURNMENT OF THE PORT HUENEME HOUSING AUTHORITY
The Port Hueneme Housing Authority adjourned at 6:55 p.m. to the next regular meeting scheduled for January 6, 2025, at 6:30 p.m.

Respectfully Submitted:

Georgianna Nicole Alvarez, MMC, CPMC
Authority Clerk
Approved this ___ day of ___________, 2025:
_________________________________
Chair

RECONVENE CITY COUNCIL REGULAR MEETING
Mayor Perez reconvened the City Council Regular Meeting at 6:55 p.m.

PRESENTATIONS

4. INTRODUCTION OF POLICE OFFICER FILIPE FIGUEIRA
Police Chief Federico provided a brief bio and introduced new Police Officer Filipe Figueira.

CONSENT CALENDAR
A motion was made by Councilmember Gama, seconded by Mayor Pro Tem McQueenLegohn, to approve Consent Calendar Item Nos. 5 – 8, as presented.

Motion passed 5-0 as follows:

AYES: Gama, Hernandez, Martinez, McQueen-Legohn, Perez
NOES: None; ABSENT: None; ABSTAIN: None
City Council:

5. MINUTES
Approved the November 18, 2024, City Council Regular Meeting Minutes.

6. REGISTER OF DISBURSEMENTS
Received and filed the City’s register of disbursements for the period of November 8, 2024 through November 24, 2024.

7. SECOND READING AND ADOPTION OF AN ORDINANCE APPROVING

AMENDMENTS TO ARTICLE X OF THE PORT HUENEME MUNICIPAL CODE WITH

REGARD TO AFFORDABLE HOUSING REGULATIONS AND TO REVISE THE MIXED Agenda Item No. 9 Page 4 of 8 CC Agenda 12-16-2024
CC & HA Regular Meeting Agenda – December 2, 2024, Page 5 of 8 USE DENSITY (R-4) ZONING STANDARDS, TO REPEAL THE CITY’S ACCESSORY

DWELLING UNIT ORDINANCE AND TO REZONE CERTAIN PROPERTIES TO BE

CONSISTENT WITH THE GENERAL PLAN LAND USE MAP, AND TO APPROVE THE

ADDENDUM TO THE ENVIRONMENTAL IMPACT REPORT PREVIOUSLY PREPARED

FOR THE GENERAL PLAN UPDATE PROJECT
Read, by title only, waiving further reading of, and adopted Ordinance No. 821, an Ordinance entitled, “An Ordinance of the City Council of the City of Port Hueneme, California amending Port Hueneme Municipal Code, Article X, Chapter 4, Section 10460 pertaining to Mixed Use Residential (R-4) zoning standards, amending Chapter 6, Section 10804 and establishing Chapter 6, Section 10805, both pertaining to affordable housing regulations, repealing Chapter 6, Section 10802, pertaining to accessory dwelling unit standards, and rezoning certain properties from General Commercial (C-1) to Mixed Use Residential (R-4) or from Limited Multifamily (R-2) to Multiple Family (R-3)”.

8. AUTHORIZATION FOR SOLE SOURCE REPAIR OF THE CITY’S BOOM TRUCK CRANE
Authorized the City Manager to execute a sole source purchase agreement with Altec Industries, Inc., for a not to exceed amount of $68,928 for the repair of the City’s boom truck crane.

PUBLIC HEARINGS – None.

BUSINESS ITEMS

9. UPDATED AGREEMENT WITH THE PORT HUENEME LITTLE LEAGUE REGARDING

BUBBLING SPRINGS PARK BALLFIELDS AND RELATED ITEMS
Recommendation: Authorize the City Manager to execute an agreement with the Port Hueneme Little League (PHLL) which will replace the prior license agreement and provide for PHLL’s use of the Bubbling Springs Park ballfields, snack bar, community room and storage area while reflecting the transfer of field maintenance duties from PHLL to the City and establishment of non-exclusive but priority-based usage of the ball fields.

Deputy City Manager Charles Peretz presented the report. Questions followed.

Public comments were provided in person by the following:
• Ana Bolo
A motion was made by Councilmember Hernandez, seconded by Councilmember Gama, to authorize the City Manager to execute an agreement with the Port Hueneme Little League (PHLL) which will replace the prior license agreement and provide for PHLL’s use of the Bubbling Springs Park ballfields, snack bar, community room and storage area while reflecting the transfer of field maintenance duties from PHLL to the City and establishment of non-exclusive but priority-based usage of the ball fields. Comments followed.

Motion passed 5-0 as follows:

AYES: Gama, Hernandez, Martinez, McQueen-Legohn, Perez
NOES: None; ABSENT: None; ABSTAIN: None

10. UPDATE ON UNITED STATES SUPREME COURT’S DECISION REGARDING

CAMPING IN PUBLIC SPACES LAWS (GRANTS PASS)
Recommendation: Receive a status update regarding the recent Supreme Court decision of Grants Pass Related to Camping in Public Spaces and its impact on local jurisdictions, and the City’s collaboration with other Ventura County agencies regarding implementation.

Agenda Item No. 9 Page 5 of 8 CC Agenda 12-16-2024
CC & HA Regular Meeting Agenda – December 2, 2024, Page 6 of 8 City Attorney Joan Smyth and Police Officer Frum presented the report. Questions followed.

Public comments were provided in person by the following:
• Mitchell Disney
• Daniel Guinnip
• Jacqueline Dougherty
Questions and comments followed.

A motion was made by Councilmember Martinez, seconded by Mayor Pro Tem McQueenLegohn, to receive a status update regarding the recent Supreme Court decision of Grants Pass Related to Camping in Public Spaces and its impact on local jurisdictions, and the City’s collaboration with other Ventura County agencies regarding implementation.

Motion passed 5-0 as follows:

AYES: Gama, Hernandez, Martinez, McQueen-Legohn, Perez
NOES: None; ABSENT: None; ABSTAIN: None

11. PRESENTATION OF DUNE RESTORATION AND MAINTENANCE PROPOSAL FOR

HUENEME BEACH PARK BY THE VENTURA SURFRIDER FOUNDATION
Recommendation: Receive information on a proposed dune restoration plan and maintenance plan for Hueneme Beach Park by the Ventura Surfrider Foundation and provide direction to staff on whether to proceed with preparing a Local Development Plan for review and approval by the California Coastal Commission.

Joan Tharp, Ventura Audubon Society volunteer/Surfrider Ventura County representative, and Carla Avila-Martinez, Surfrider Foundation Climate Action Program Manager, gave a presentation. Questions followed.

Public comments were submitted via email and read by City Clerk Georgianna Alvarez by the following:
• Christina Zubko
• Cynthia Hartley
A motion was made by Councilmember Gama, seconded by Councilmember Hernandez, to provide direction to staff to proceed with preparing a Local Development Plan with the request to bring the item back to Council which would include obtaining approval from the Coastal Commission; an agreement that clearly identifies that access will be made available for the public and for maintenance purposes and that the project would not prevent any future improvements; and that the City will partner with Surfrider to provide educational information to the neighbors. Comments followed.

Motion passed 5-0 as follows:

AYES: Gama, Hernandez, Martinez, McQueen-Legohn, Perez
NOES: None; ABSENT: None; ABSTAIN: None

12. AUTHORIZE THE ISSUANCE OF A REQUEST FOR PROPOSALS (RFP) TO CONDUCT

WATER, WASTEWATER AND SOLID WASTE RATE STUDIES
Recommendation: Authorize staff to issue a Request for Proposals (RFP) to conduct Water, Wastewater and Solid Waste rate studies to analyze the rates associated with each city utility and provide recommendations regarding rates for future City Council consideration.

Agenda Item No. 9 Page 6 of 8 CC Agenda 12-16-2024
CC & HA Regular Meeting Agenda – December 2, 2024, Page 7 of 8 City Manager James Vega presented the report. Questions followed. There were no public comments.

A motion was made by Councilmember Hernandez, seconded by Councilmember Gama, to authorize staff to issue a Request for Proposals (RFP) to conduct Water, Wastewater and Solid Waste rate studies to analyze the rates associated with each city utility and provide recommendations regarding rates for future City Council consideration.

Motion passed 5-0 as follows:

AYES: Gama, Hernandez, Martinez, McQueen-Legohn, Perez
NOES: None; ABSENT: None; ABSTAIN: None

CITY MANAGER COMMENTS AND REPORTS
City Manager James Vega provided comments and reports regarding the following topics:
• Thanksgiving Turkey Dinner Giveaway
• Upcoming events: Holiday Tree Lighting Celebration, Senior Holiday Luncheon • Community preparedness and mural update
• Dredge Project update
• Upcoming Council meeting topics
COUNCILMEMBERS’ REPORTS AND COMMENTS
Council provided comments and reports regarding the following topics:

Councilmember Martinez:
• Recreation, Education, Activities, and Culture in Hueneme (REACH) meeting • Sister City Committee update
Councilmember Gama:
• Beach Erosion Authority for Clean Oceans and Nourishment (BEACON) meetings • Ventura County Animal Services update
• Tree Lighting Ceremony
• CBS Sunday Morning
Councilmember Hernandez:
• Upcoming Southern California Association of Governments (SCAG) meetings • Forward City Clerk PowerPoint presentations to share with City Council • Upcoming Mural meeting
• Tree Lighting Ceremony
• Mariachi Girl
• Public comments
Mayor Pro Tem McQueen-Legohn:
• Javier Niño’s Art Gallery
• Upcoming meetings
• Tree Lighting Ceremony
• Upcoming Vacation
• Gold Coast Transit District (GCTD) updates
Mayor Perez:
• Upcoming SCAG meeting
• Upcoming Economic Development Collaborative (EDC) meeting Agenda Item No. 9 Page 7 of 8 CC Agenda 12-16-2024
CC & HA Regular Meeting Agenda – December 2, 2024, Page 8 of 8

REQUEST FOR FUTURE AGENDA ITEMS
Councilmember Martinez:

1. Requested an item be added to a future Council agenda to consider allowing REACH to continue to use the storage room at Moranda Park, seconded by Councilmember Gama.

Motion passed unanimously, 5-0.

2. Requested an item be added to a future Council agenda to consider REACH’s request to work with staff to develop a plan to paint the electrical boxes around the City, seconded by Councilmember Hernandez. Motion passed unanimously, 5-0.

3. Requested an item be added to a future Council agenda to consider the authorization of REACH to coordinate with City staff for future events. Councilmember Martinez withdrew the request indicating that no motion was needed. City Manager James Vega indicated if REACH has a specific request from the City, then the specific request would come to Council for consideration.

4. Requested an item be added to a future Council agenda to consider waiving the fees at the Community Center for the Sister City Committee to hold their first fundraiser event sometime early next year, seconded by Councilmember Hernandez. Motion passed unanimously, 5-0.

Councilmember Hernandez:

1. Sought confirmation that staff will be following up on the homeless grants pass item. City Manager James Vega confirmed that staff plans to bring back an item to Council once clarity is obtained from the countywide Attorney’s group.

Mayor Pro Tem McQueen-Legohn:

1. Requested an item be added to a future Council agenda regarding the review of ordinances that the City is not currently enforcing, seconded by Councilmember Martinez.

Motion passed unanimously, 5-0.

ADJOURNMENT
The City Council adjourned at 9:00 p.m. to its next regular meeting scheduled for Monday, December 16, 2024, at 6:30 p.m.

Respectfully Submitted:

Georgianna Nicole Alvarez, MMC, CPMC
City Clerk
Approved this 16th day of December, 2024:
_________________________________
Mayor
Agenda Item No. 9 Page 8 of 8 CC Agenda 12-16-2024

DATE: December 16, 2024
TO: Honorable City Council
FROM: James Vega, City Manager
Lupe Acero, Finance Director
SUBJECT: REGISTER OF DISBURSEMENTS
RECOMMENDATION:

Receive and file the City’s Register of Disbursements for the period of November 25, 2024 through December 8, 2024.

BACKGROUND/ANALYSIS:

Cash disbursements are made weekly based on the submission of all required documents supporting the invoices submitted for payment. Prior to payment, Finance Department staff reviews all disbursement documents to ensure that they meet the approval requirements adopted in the Municipal Code and the City’s Purchasing Policies and Procedures Manual. The summary table below represents the Register of Disbursements as required by the Municipal Code § 2302 and included for the listed check dates. The disbursements are accounted for in the current budget.

Date Type of Payment Attachment Amount
November 27, 2024 EFT Transactions 27894-27898
A/P Checks 138798-138866
A $160,177.30
November 29, 2024 Payroll Distribution B $491,062.06
December 5, 2024 EFT Transaction 28063-28065
A/P Checks 138867-138945
C $693,682.76
TOTAL $1,344,922.12
FISCAL IMPACT:

This is an informational report only.

ATTACHMENTS:

A through C: Disbursement Registers
Agenda Item No. 10 Page 1 of 20 CC Agenda 12-16-2024
This Page Intentionally Left Blank
Agenda Item No. 10 Page 2 of 20 CC Agenda 12-16-2024
Disbursements for 11/27/2024 Attachment A
12/9/2024
Accounts Payable Check Register
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount ALEXANDER'S CONTRACT SERVICES, INC 3755 NOVEMBER 2024 WATER METER READING SERVICE CYCLE 1
301560-5204 Water Operations
Fund
25019 105412 11/27/2024 27894 3,227.10
ALEXANDER'S CONTRACT SERVICES, INC 3755 NOVEMBER 2024 WATER METER READING SERVICE CYCLE 1
301560-5204 Water Operations
Fund
25019 105413 11/27/2024 27894 3,976.20
AMAZON CAPITAL SERVICES 4872 ADMIN SUPPLIES-CITY HALL-PICTURE FRAMES 101112-5540 General Fund 13DR-QV1H-R7RP 11/27/2024 27895 234.84 AMAZON CAPITAL SERVICES 4872 AUTOMOTIVE SUPPLIES-INVENTORY-MOP 101554-5520 General Fund 11HD-LVPR-PM9H 11/27/2024 27896 52.71 AMAZON CAPITAL SERVICES 4872 REC EVENT SUPPLIES-SENIOR LUNCHEONPAPER PLACEMATS101671-5234 General Fund 14J6-R76N-PJVR 11/27/2024 27896 222.86 AMAZON CAPITAL SERVICES 4872 FM SUPPLIES-CITY HALL-LIMESTONE SEALANT 101780-5520 General Fund 16ML-GHJQ-J11H 11/27/2024 27896 133.09 AMAZON CAPITAL SERVICES 4872 FM SUPPLIES-CITY HALL DOORS-OIL BASED

GEL STAIN
101780-5520 General Fund 1FNH-G7HP-VY6N 11/27/2024 27896 43.55 AMAZON CAPITAL SERVICES 4872 REC EVENT SUPPLIES-SR LUNCHEONRICE/SOCKS/BUTTONS101671-5234 General Fund 1V4X-9VYW-NXYV 11/27/2024 27896 37.75 AMAZON CAPITAL SERVICES 4872 REFUSE UNIFORMS-RAIN JACKETS-G

MORENO/D MAGANA
304563-5510 Solid Waste
Operations Fund
1NHX-PR3Y-NCG7 11/27/2024 27897 107.58
CCE DESIGN ASSOCIATE 5672 OCTOBER 2024- B SPRINGS SWPPP

PRACTITIONER QSP SV
210780-5700 Grant Tracking Fund 20240165 3870 11/27/2024 27898 620.06 CCE DESIGN ASSOCIATE 5672 OCTOBER 2024- B SPRINGS SWPPP

PRACTITIONER QSP SV
210780-5700 Grant Tracking Fund 20240165 3870 11/27/2024 27898 72.85 CCE DESIGN ASSOCIATE 5672 OCTOBER 2024- B SPRINGS SWPPP

PRACTITIONER QSP SV
210780-5700 Grant Tracking Fund 20240165 3870 11/27/2024 27898 66.99 CCE DESIGN ASSOCIATE 5672 OCTOBER 2024- B SPRINGS SWPPP

PRACTITIONER QSP SV
210780-5700 Grant Tracking Fund 20240165 3870 11/27/2024 27898 270.46 CCE DESIGN ASSOCIATE 5672 OCTOBER 2024- B SPRINGS SWPPP

PRACTITIONER QSP SV
210780-5700 Grant Tracking Fund 20240165 3870 11/27/2024 27898 56.10 CCE DESIGN ASSOCIATE 5672 OCTOBER 2024- B SPRINGS SWPPP

PRACTITIONER QSP SV
210780-5700 Grant Tracking Fund 20240165 3870 11/27/2024 27898 288.47 CCE DESIGN ASSOCIATE 5672 OCTOBER 2024- B SPRINGS SWPPP

PRACTITIONER QSP SV
210780-5700 Grant Tracking Fund 20240165 3870 11/27/2024 27898 54.01 CCE DESIGN ASSOCIATE 5672 OCTOBER 2024- B SPRINGS SWPPP

PRACTITIONER QSP SV
210780-5700 Grant Tracking Fund 20240165 3870 11/27/2024 27898 298.93 CCE DESIGN ASSOCIATE 5672 OCTOBER 2024- B SPRINGS SWPPP

PRACTITIONER QSP SV
210780-5700 Grant Tracking Fund 20240165 3870 11/27/2024 27898 170.40 CCE DESIGN ASSOCIATE 5672 OCTOBER 2024- B SPRINGS SWPPP

PRACTITIONER QSP SV
210780-5700 Grant Tracking Fund 20240165 3870 11/27/2024 27898 73.27 CCE DESIGN ASSOCIATE 5672 OCTOBER 2024- B SPRINGS SWPPP

PRACTITIONER QSP SV
210780-5700 Grant Tracking Fund 20240165 3870 11/27/2024 27898 370.53 CCE DESIGN ASSOCIATE 5672 OCTOBER 2024- B SPRINGS SWPPP

PRACTITIONER QSP SV
210780-5700 Grant Tracking Fund 20240165 3870 11/27/2024 27898 1,654.18 Check No. 27897
Check Total: 107.58
Check No. 27898
Check Total: 3996.25
Check No. 138798
Check No. 27894
Check Total: 7203.30
Check No. 27895
Check Total: 234.84
Check No. 27896
Check Total: 489.96
Agenda Item No. 10 Page 3 of 20 CC Agenda 12-16-2024
Disbursements for 11/27/2024 Attachment A
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount REFUND 99999 CUST ACCT CLOSED- WATER/SEWAGE/TRASH

UTIL DEP RFND
301000-2408 Water Operations
Fund
000019457-
001021498
11/27/2024 138798 119.08
REFUND 99999 CUST ACCT CLOSED-WATER/SEWAGE/TRASH

UTIL DEP REFND
301000-2408 Water Operations
Fund
000040057-
001017578
11/27/2024 138799 93.44
ANDY GUMP, INC 5544 9/25/24-10/22/24 LIFEGRD PORTABLE

BATHROOM RENTAL
101673-5220 General Fund INV1174363 11/27/2024 138800 580.19 ANDY'S AUTOMOTIVE REPAIR INC 5407 AUTOMOTIVE REPAIRS-PDPAT VEH80316-

COOLING SYSTEM
101554-5215 General Fund 296 11/27/2024 138801 565.73
ARAMSCO, INC 5006 LANDSCAPE SUPPLIES-TRASH LINERS 101553-5520 General Fund S6554739.001 11/27/2024 138802 609.13 ARAMSCO, INC 5006 LANDSCAPE SUPPLIES-TRASH LINERS 101553-5520 General Fund S6691272.001 11/27/2024 138802 950.87 ARAMSCO, INC 5006 FM SUPPLIES-TOILET PAPER/SEAT

COVERS/FLOOR PAD
101780-5520 General Fund S6693607.001 11/27/2024 138802 360.25 ARAMSCO, INC 5006 FM SUPPLIES-MOP/URINAL SCREEN/TOILET

SEAT COVERS
101780-5520 General Fund S6517295.001 11/27/2024 138803 276.50 BEGINNERS EDGE SPORTS TRAINING, LLC 5508 FALL 2024 SESSION 2 RECREATION CLASS 101000-2214 General Fund 11252024 FALL24 11/27/2024 138804 1,148.00 BENEFIT COORDINATORS CORPORATION 5282 DECEMBER 2024 DENTAL PREMIUMS 501000-2242 Payroll Clearing Fund
B0GF0Y 11/27/2024 138805 7,749.20
CALIFORNIA WOOD RECYCLING 291 NOVEMBER 1-15, 2024 WOOD AND BRUSH

BILLING
304563-5233 Solid Waste
Operations Fund
145383C-IN 11/27/2024 138806 2,069.41
CANON FINANCIAL SERVICES, INC 3733 001-0668326-009 HR COPIER SERVICES - NOVEMBER 2024
101115-5220 General Fund 36191711 11/27/2024 138807 242.71 CED ROYAL INDUSTRIAL SOLUTIONS 3689 TECHCONNECT SOFTWARE SUPPORT/LV DRIVES
302561-5204 Water Plant
Operations Fund
25121 9009-1052511 11/27/2024 138808 6,128.82
CED ROYAL INDUSTRIAL SOLUTIONS 3689 TECHCONNECT SOFTWARE SUPPORT/LV DRIVES
303562-5204 Wastewater
Operations Fund
25121 9009-1052511 11/27/2024 138808 680.98
Check No. 138808
Check Total: 6809.80
Check No. 138805
Check Total: 7749.20
Check No. 138806
Check Total: 2069.41
Check No. 138807
Check Total: 242.71
Check No. 138802
Check Total: 1920.25
Check No. 138803
Check Total: 276.50
Check No. 138804
Check Total: 1148.00
Check No. 138799
Check Total: 93.44
Check No. 138800
Check Total: 580.19
Check No. 138801
Check Total: 565.73
Check Total: 119.08
Agenda Item No. 10 Page 4 of 20 CC Agenda 12-16-2024
Disbursements for 11/27/2024 Attachment A
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount COPQUEST INCORPORATED 2835 PD EQUIPMENT- GUN LIGHT RAIL MOUNT 101441-5526 General Fund 702372 11/27/2024 138809 328.98 COUNTY OF VENTURA, GSA 535 PD FORD CROWN VICTORIA AUTOMOTIVE

REPAIRS
101441-5215 General Fund 9360-2410 11/27/2024 138810 110.15 DURAN TIRE LLC 5622 AUTOMOTIVE REPAIRS-PWWW VEH 6130-TIRES 101554-5520 General Fund 1649 11/27/2024 138811 508.30 DURAN TIRE LLC 5622 AUTOMOTIVE REPAIRS-PWWW VEH 6123-TIRES 101554-5520 General Fund 1774 11/27/2024 138811 408.47 DURAN TIRE LLC 5622 AUTOMOTIVE REPAIRS-PWSW VEH 9125-TIRES 101554-5520 General Fund 1783 11/27/2024 138811 719.27 DURAN TIRE LLC 5622 AUTOMOTIVE REPAIRS-PWSW VEH 9127-TIRES 101554-5520 General Fund 1804 11/27/2024 138811 782.74 DURAN TIRE LLC 5622 AUTOMOTIVE REPAIRS-PWSW VEH 9133-TIRES 101554-5520 General Fund 1812 11/27/2024 138811 719.27 DURAN TIRE LLC 5622 AUTOMOTIVE REPAIRS-CDENF VEH 3100-TIRES 101554-5520 General Fund 1813 11/27/2024 138811 225.87 DURAN TIRE LLC 5622 AUTOMOTIVE SUPPLIES-INVENTORY-TIRES 101554-5520 General Fund 1814 11/27/2024 138811 225.87 DURAN TIRE LLC 5622 AUTOMOTIVE REPAIRS-PWWW VEH 6130-

ALIGNMENT
101554-5215 General Fund 1852 11/27/2024 138811 75.00
LUCIA ELMORE 5612 10/24/24 SPOOKTACULAR COMM EVENT FACE

PAINT SVCS
101671-5234 General Fund 491015 11/27/2024 138812 510.00 FAMCON PIPE SUPPLY INC 337 WASTEWATER REPAIRS-FORCEMAIN BREAKFLANGES/ADAPTER303562-5700 Wastewater Operations Fund
S100139357.001 11/27/2024 138813 2,807.93
FAMCON PIPE SUPPLY INC 337 LANDSCAPE REPAIRS- 8" PIPE 101553-5523 General Fund S100142595.001 11/27/2024 138813 616.69 FGL ENVIRONMENTAL 339 BACTI/MISC WATER QUALITY ANALYSIS COPH 301560-5230 Water Operations Fund
25007 418753A 11/27/2024 138814 125.00
FRONTIER COMMUNICATIONS 4230 209-063-8462-070302-5 UTILITY BILL 101441-5301 General Fund 302-5 11102024 11/27/2024 138815 111.17 GATEHOUSE MSI LLC 4894 PD PROPERTY ROOM LARGE FREEZER

REPLACEMENT
101440-5600 General Fund 25103 36265-F 11/27/2024 138816 14,364.28 GLADWELL GOVERNMENTAL SERVICES, INC 3782 CITY RECORDS RETENTION SERVICES- Phase 1 101113-5223 General Fund 25112 5578 11/27/2024 138817 5,440.00 Check No. 138817
Check Total: 5440.00
Check No. 138814
Check Total: 125.00
Check No. 138815
Check Total: 111.17
Check No. 138816
Check Total: 14364.28
Check No. 138811
Check Total: 3664.79
Check No. 138812
Check Total: 510.00
Check No. 138813
Check Total: 3424.62
Check No. 138809
Check Total: 328.98
Check No. 138810
Check Total: 110.15
Agenda Item No. 10 Page 5 of 20 CC Agenda 12-16-2024
Disbursements for 11/27/2024 Attachment A
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount MARTIN NEVAREZ 5606 EMBROIDERY SERVICES-REC & COMMUNITY SVCS
101671-5214 General Fund 10072405 11/27/2024 138818 404.19 GRAINGER INC 345 FM SUPPLIES-CITY BUILDINGS-AIR FILTERS 101780-5520 General Fund 9326469823 11/27/2024 138819 1,173.89 GRANITE CONSTRUCTION COMPANY 2144 STREETS SUPPLIES-ASPHALT 204551-5524 Gas Tax Fund 2849884 11/27/2024 138820 199.90 HOLLISTER & BRACE 4735 OCT'24 WATER RIGHTS AND OPV BASIN

ADJUDICATION
301560-5202 Water Operations
Fund
25078 10295316 11/27/2024 138821 2,987.75
INDUSTRIAL BOLT AND SUPPLY 1532 WATER PLANT SUPPLIESUNISTRUT/ATR/WASHERS/HEX NUTS302561-5520 Water Plant Operations Fund
258892-1 11/27/2024 138822 590.56
INTERSTATE BATTERY OF SIERRA MADRE 5481 AUTOMOTIVE SUPPLIES-HA VEH 4133-BATTERY 101554-5523 General Fund 22578726 11/27/2024 138823 255.33 ROSENDO JIMENEZ 5792 PURCHASE REIMBURSEMENT-LIVESCAN-R

JIMENEZ
101115-5204 General Fund 11182024 11/27/2024 138824 29.95 KPCS CONSULTING, LLC 52 OCT'24 OFFICE 365

MIGRATION/IMPLMENTATION LICENSE
101116-5223 General Fund 24200130 11/27/2024 138825 1,190.00 LEDDY POWER SYSTEMS, INC 3956 ANNUAL PW GENERATOR PREVENTATIVE

MAINT SERVICE
101780-5212 General Fund 3213 11/27/2024 138826 1,688.42 LEDDY POWER SYSTEMS, INC 3956 ANNUAL PD GENERATOR PREVENTATIVE

MAINT SERVICE
101780-5212 General Fund 3214 11/27/2024 138826 1,904.85 LINCOLN NATIONAL LIFE INSURANCE CO 2567 DECEMBER 2024 INSURANCE PREMIUMS- REF #4770670832
501000-2243 Payroll Clearing
Fund
4010 11202024A 11/27/2024 138827 8,276.17
LINCOLN NATIONAL LIFE INSURANCE CO 2567 DECEMBER 2024 VOLUNTARY-REF #4770670832 501000-2252 Payroll Clearing Fund
4010 11202024B 11/27/2024 138827 3,455.95
LINDE GAS & EQUIPMENT INC. 5201 FLEET CYLINDER RENTAL - INDUSTRIAL

ACETYLENE
101554-5215 General Fund 46481831 11/27/2024 138828 288.39 Check No. 138829
Check No. 138826
Check Total: 3593.27
Check No. 138827
Check Total: 11732.12
Check No. 138828
Check Total: 288.39
Check No. 138823
Check Total: 255.33
Check No. 138824
Check Total: 29.95
Check No. 138825
Check Total: 1190.00
Check No. 138820
Check Total: 199.90
Check No. 138821
Check Total: 2987.75
Check No. 138822
Check Total: 590.56
Check No. 138818
Check Total: 404.19
Check No. 138819
Check Total: 1173.89
Agenda Item No. 10 Page 6 of 20 CC Agenda 12-16-2024
Disbursements for 11/27/2024 Attachment A
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount MCMASTER-CARR SUPPLY COMPANY 5746 WATER PLANT SUPPLIES-FLEXIBLE METAL

CONDUIT ADPTRS
302561-5520 Water Plant
Operations Fund
36581277 11/27/2024 138829 190.74
MCMASTER-CARR SUPPLY COMPANY 5746 PHWA SUPPLIES-CAUSTIC PUMP/ELEC

CONTROL ENCLOSURE
302561-5520 Water Plant
Operations Fund
36597100 11/27/2024 138830 124.79
MCMASTER-CARR SUPPLY COMPANY 5746 WATER PLANT SUPPLIES-FLEXIBLE METAL

CONDUIT ADPTRS
302561-5520 Water Plant
Operations Fund
36656321 11/27/2024 138830 176.84
NATIONAL GRAPHICS, LLC 5660 UTIL BILL OFFICE SUPPLIES-#9 RETURN

ENVELOPES
303562-5500 Wastewater
Operations Fund
103424 11/27/2024 138831 446.91
NATIONAL GRAPHICS, LLC 5660 UTIL BILL OFFICE SUPPLIES-#9 RETURN

ENVELOPES
301560-5500 Water Operations
Fund
103424 11/27/2024 138831 446.91
NATIONAL GRAPHICS, LLC 5660 UTIL BILL OFFICE SUPPLIES-#9 RETURN

ENVELOPES
304563-5500 Solid Waste
Operations Fund
103424 11/27/2024 138831 446.92
NATIONAL GRAPHICS, LLC 5660 UTIL BILL OFFICE SUPPLIES-#10 RETURN

ENVELOPES
304563-5500 Solid Waste
Operations Fund
103558 11/27/2024 138831 242.82
NATIONAL GRAPHICS, LLC 5660 UTIL BILL OFFICE SUPPLIES-#10 RETURN

ENVELOPES
303562-5500 Wastewater
Operations Fund
103558 11/27/2024 138831 242.82
NATIONAL GRAPHICS, LLC 5660 UTIL BILL OFFICE SUPPLIES-#10 RETURN

ENVELOPES
301560-5500 Water Operations
Fund
103558 11/27/2024 138831 242.82
NATIONAL GRAPHICS, LLC 5660 UTIL BILL OFFICE SUPPLIES-BLANK DOOR

HANGERS
304563-5500 Solid Waste
Operations Fund
104228 11/27/2024 138831 291.65
NATIONAL GRAPHICS, LLC 5660 UTIL BILL OFFICE SUPPLIES-BLANK DOOR

HANGERS
303562-5500 Wastewater
Operations Fund
104228 11/27/2024 138831 291.66
NATIONAL GRAPHICS, LLC 5660 UTIL BILL OFFICE SUPPLIES-BLANK DOOR

HANGERS
301560-5500 Water Operations
Fund
104228 11/27/2024 138831 291.66
NATIONAL GRAPHICS, LLC 5660 UTIL BILL OFFICE SUPPLIES-#10 WINDOW

ENVELOPES
301560-5500 Water Operations
Fund
105349 11/27/2024 138831 369.43
NATIONAL GRAPHICS, LLC 5660 UTIL BILL OFFICE SUPPLIES-#10 WINDOW

ENVELOPES
303562-5500 Wastewater
Operations Fund
105349 11/27/2024 138831 369.44
NATIONAL GRAPHICS, LLC 5660 UTIL BILL OFFICE SUPPLIES-#10 WINDOW

ENVELOPES
304563-5500 Solid Waste
Operations Fund
105349 11/27/2024 138831 369.43
NORTH AMERICAN SERVICES, INC 5775 SENIOR HOLIDAY LUNCHEON 12/10/24

CATERING BALANCE
101671-5234 General Fund 12102024 11/27/2024 138832 3,442.72 MONROE ENGINEERING GROUP LLC 5687 REFUSE SUPPLIES-240 CASTER SWIVEL WHEELS
304563-5520 Solid Waste
Operations Fund
787447 11/27/2024 138833 4,926.38
PEREZ, JOSE 333 11/11/24 CODE ENF/PRK ENF/CITY ADM CAR
WASHES
101554-5215 General Fund 11112024-CD 11/27/2024 138834 25.00 PEREZ, JOSE 333 11/11/24 CODE ENF/PRK ENF/CITY ADM CAR
WASHES
101554-5215 General Fund 11112024-CD 11/27/2024 138834 25.00 PEREZ, JOSE 333 11/14/24 PWWW/PWSW/PWL/PWE CAR
WASHES
101554-5215 General Fund 11142024-PW 11/27/2024 138834 25.00 PEREZ, JOSE 333 11/14/24 PWWW/PWSW/PWL/PWE CAR
WASHES
101554-5215 General Fund 11142024-PW 11/27/2024 138834 25.00 PEREZ, JOSE 333 11/14/24 PWWW/PWSW/PWL/PWE CAR
WASHES
101554-5215 General Fund 11142024-PW 11/27/2024 138834 25.00 Check No. 138832
Check Total: 3442.72
Check No. 138833
Check Total: 4926.38
Check No. 138834
Check Total: 190.74
Check No. 138830
Check Total: 301.63
Check No. 138831
Check Total: 4052.47
Agenda Item No. 10 Page 7 of 20 CC Agenda 12-16-2024
Disbursements for 11/27/2024 Attachment A
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount PEREZ, JOSE 333 11/14/24 PWWW/PWSW/PWL/PWE CAR
WASHES
101554-5215 General Fund 11142024-PW 11/27/2024 138834 25.00 PEREZ, JOSE 333 11/14/24 PWWW/PWSW/PWL/PWE CAR
WASHES
101554-5215 General Fund 11142024-PW 11/27/2024 138834 25.00 PEREZ, JOSE 333 11/22/24 PD ADMIN & PATROL CAR WASHES 101441-5215 General Fund 11222024-PD 11/27/2024 138834 300.00 PLATINUM TOW AND TRANSPORT, INC 3781 NOVEMBER 2024 TOW AND STORAGE 101441-5204 General Fund 127077 11/27/2024 138835 125.00 PLATINUM TOW AND TRANSPORT, INC 3781 NOVEMBER 2024 TOW AND STORAGE 101441-5204 General Fund 127078 11/27/2024 138835 268.00 PPG ARCHITECTURAL FINISHES 3761 REFUSE SUPPLIES-SEMI GLOSS PAINT 304563-5520 Solid Waste Operations Fund
808920003340 11/27/2024 138836 536.81
PRIME BUILDING MATERIALS INC 516 WATER SUPPLIES-FILL SAND 301560-5523 Water Operations Fund
330925 11/27/2024 138837 260.67
PRIME BUILDING MATERIALS INC 516 WATER SUPPLIES-FILL SAND 301560-5523 Water Operations Fund
330926 11/27/2024 138837 347.56
RCA INVESTMENTS, INC 5636 PD NEW VEHICLE PURCHASE- BMW

MOTORCYCLE
101441-5600 General Fund 20240129 1002 11/27/2024 138838 35,932.69 RED WING BUSINESS ADVANTAGE ACCOUNT 421 BOOT ALLOWANCE-A REYES 101115-5164 General Fund 131-1-286126 11/27/2024 138839 160.88 REMS COLLISION CENTER LLC 4793 AUTOMOTIVE COLLISION REPAIR-PD V80821-

PARTS/LABOR
101554-5215 General Fund 2078 11/27/2024 138840 1,639.08 RUBIO'S WELDING SERVICE 3305 ROLLOFF CONTAINER REPAIRS 304563-5211 Solid Waste Operations Fund
4795 11/27/2024 138841 2,175.00
RUBIO'S WELDING SERVICE 3305 3Y & 6Y PARTIAL BIN REPAIRS 304563-5211 Solid Waste Operations Fund
4794 11/27/2024 138842 2,130.00
STANDARD PLUMBING SUPPLY CO 3970 WATER PLANT SUPPLIES-BLUE

GLUE/NIPPLES/ADPTR
302561-5520 Water Plant
Operations Fund
XRJG83 11/27/2024 138843 27.40
STATE READY MIX INC. 586 CONCRETE DUMP FEES - STREETS 101551-5524 General Fund 53509 11/27/2024 138844 71.00 STATE READY MIX INC. 586 MISC PRODUCT DUMP FEES 304563-5233 Solid Waste Operations Fund
55110 11/27/2024 138844 131.00
Check No. 138844
Check No. 138841
Check Total: 2175.00
Check No. 138842
Check Total: 2130.00
Check No. 138843
Check Total: 27.40
Check No. 138838
Check Total: 35932.69
Check No. 138839
Check Total: 160.88
Check No. 138840
Check Total: 1639.08
Check No. 138835
Check Total: 393.00
Check No. 138836
Check Total: 536.81
Check No. 138837
Check Total: 608.23
Check Total: 475.00
Agenda Item No. 10 Page 8 of 20 CC Agenda 12-16-2024
Disbursements for 11/27/2024 Attachment A
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount STATE READY MIX INC. 586 MISC PRODUCT DUMP FEES 304563-5233 Solid Waste Operations Fund
55226 11/27/2024 138845 524.00
ANGEL, STROBEL 5615 FM SUPPLIES-7MIL NITRILE GLOVES 101780-5520 General Fund BD24204 11/27/2024 138846 128.02 SWANK MOTION PICTURES, INC 4102 10/19/24 MOVIES IN THE PARK-WONKA 101671-5234 General Fund DB 3764112 11/27/2024 138847 450.00 THE HIDEAWAY AT BEACH HOUSE 3623 DECEMBER 2024 HOA PAYMENT - 303 HARBOR

BREEZE DR
101780-5204 General Fund 0401 12012024A 11/27/2024 138848 399.00 THE HIDEAWAY AT BEACH HOUSE 3623 DECEMBER 2024 HOA PAYMENT - 304 HARBOR

BREEZE DR
101780-5204 General Fund 0501 12012024 11/27/2024 138849 399.00 THE HIDEAWAY AT BEACH HOUSE 3623 DECEMBER 2024 HOA PAYMENT - 322 HARBOR

BREEZE DR
101780-5204 General Fund 2301 12012024 11/27/2024 138850 399.00 THE HIDEAWAY AT BEACH HOUSE 3623 DECEMBER 2024 HOA PAYMENT - 323 HARBOR

BREEZE DR
101780-5204 General Fund 2401 12012024A 11/27/2024 138851 399.00 THE HIDEAWAY AT BEACH HOUSE 3623 DECEMBER 2024 HOA PAYMENT - 332 HARBOR

BREEZE DR
101780-5204 General Fund 3101 12012024 11/27/2024 138852 399.00 THE HIDEAWAY AT BEACH HOUSE 3623 DECEMBER 2024 HOA PAYMENT - 775 OCEAN

BREEZE DR
101780-5204 General Fund 2401 12012024B 11/27/2024 138853 399.00 THE HIDEAWAY AT BEACH HOUSE 3623 DECEMBER 2024 HOA PAYMENT - 776 OCEAN

BREEZE DR
101780-5204 General Fund 2501 12012024 11/27/2024 138854 399.00 THE HIDEAWAY AT BEACH HOUSE 3623 DECEMBER 2024 HOA PAYMENT - 802 MORNING

MIST LN
101780-5204 General Fund 0301 12012024 11/27/2024 138855 399.00 THE HIDEAWAY AT BEACH HOUSE 3623 DECEMBER 2024 HOA PAYMENT - 803 MORNING

MIST LN
101780-5204 General Fund 0401 12012024B 11/27/2024 138856 449.00 Check No. 138856
Check Total: 449.00
Check No. 138857
Check No. 138853
Check Total: 399.00
Check No. 138854
Check Total: 399.00
Check No. 138855
Check Total: 399.00
Check No. 138850
Check Total: 399.00
Check No. 138851
Check Total: 399.00
Check No. 138852
Check Total: 399.00
Check No. 138847
Check Total: 450.00
Check No. 138848
Check Total: 399.00
Check No. 138849
Check Total: 399.00
Check Total: 202.00
Check No. 138845
Check Total: 524.00
Check No. 138846
Check Total: 128.02
Agenda Item No. 10 Page 9 of 20 CC Agenda 12-16-2024
Disbursements for 11/27/2024 Attachment A
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount UNIFIRST CORPORATION 5314 WATER/WATER PLANT UNIFORM SERVICES 302561-5214 Water Plant Operations Fund
2210149782 11/27/2024 138857 61.58
UNIFIRST CORPORATION 5314 WATER/WATER PLANT UNIFORM SERVICES 301560-5214 Water Operations Fund
2210149782 11/27/2024 138857 61.58
UNIFIRST CORPORATION 5314 WATER/WATER PLANT UNIFORM SERVICES 302561-5214 Water Plant Operations Fund
2210151438 11/27/2024 138857 66.73
UNIFIRST CORPORATION 5314 WATER/WATER PLANT UNIFORM SERVICES 301560-5214 Water Operations Fund
2210151438 11/27/2024 138857 66.72
UNIFIRST CORPORATION 5314 FM SUPPLIES-MATS/MOPS SERVICES 101780-5212 General Fund 2210151417 11/27/2024 138858 28.91 UNIFIRST CORPORATION 5314 REFUSE UNIFORM SERVICES 304563-5214 Solid Waste Operations Fund
2210149779 11/27/2024 138859 92.82
UNIFIRST CORPORATION 5314 REFUSE UNIFORM SERVICES 304563-5214 Solid Waste Operations Fund
2210151432 11/27/2024 138860 92.82
UNIVAR USA, INC 2358 CHEMICAL PURCHASE- SODIUM

HYPOCHLORITE
302561-5521 Water Plant
Operations Fund
25009 52590361 11/27/2024 138861 4,572.11
V&V MANUFACTURING, INC. 1249 PD UNIFORMS-BADGE REPAIRS 101441-5214 General Fund 60694 11/27/2024 138862 205.41 YOLANDA VAZQUEZ 5794 HOTEL REIMBURSEMENT-TERMITE
TREATEMENT-775 JANE DR
213781-5204 Housing Successor
Agency Fund
11192024 11/27/2024 138863 317.78
VENTURA COUNTY AUTO SUPPLY/NAPA 4746 AUTOMOTIVE REPAIRS-PWWW VEH 61011- CLAMP
101554-5523 General Fund 022894 11/27/2024 138864 32.43 VENTURA COUNTY AUTO SUPPLY/NAPA 4746 AUTOMOTIVE SUPPLIES-INVENTORY-AMA

PRIME FUEL
101554-5520 General Fund 023094 11/27/2024 138864 546.24 WELLS TAPPING SERVICE, INC 5604 WATER REPAIRS-BARD ROAD- 6" INSTA-VALVE 301560-5601 Water Operations Fund
25123 10064 11/27/2024 138865 7,600.00
WHITE CAP, L.P. 3867 STREETS SUPPLIES-NITRILE

GLOVES/BRUSH/EARPLUGS
101551-5510 General Fund 50029267692 11/27/2024 138866 237.80 WHITE CAP, L.P. 3867 STREETS SUPPLIES-NITRILE

GLOVES/BRUSH/EARPLUGS
101551-5520 General Fund 50029267692 11/27/2024 138866 126.74 Grand Total 160,177.30
Check No. 138865
Check Total: 7600.00
Check No. 138866
Check Total: 364.54
Check No. 138862
Check Total: 205.41
Check No. 138863
Check Total: 317.78
Check No. 138864
Check Total: 578.67
Check No. 138859
Check Total: 92.82
Check No. 138860
Check Total: 92.82
Check No. 138861
Check Total: 4572.11
Check Total: 256.61
Check No. 138858
Check Total: 28.91
Agenda Item No. 10 Page 10 of 20 CC Agenda 12-16-2024

ATTACHMENT B

SALARY DISTRIBUTIONS
PAYROLL DIRECT DEPOSIT TOTALS: $482,557.95
PAYROLL CHECK REGISTER: $8,504.11 $491,062.06
TOTAL DISBURSEMENT: $491,062.06

CITY OF PORT HUENEME

PAYROLL CASH DISBURSEMENT FOR
November 29, 2024
Agenda Item No. 10 Page 11 of 20 CC Agenda 12-16-2024
Disbursements for 12/5/2024 Attachment C
12/9/2024
Accounts Payable Check Register
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount AMAZON CAPITAL SERVICES 4872 LANDSCAPE SUPPLIES-SOAP/PRUNING

SAW/TRAFFIC SIGNS
101553-5526 General Fund 1C1Q-JDN6-MLD4 12/05/2024 28063 195.71 AMAZON CAPITAL SERVICES 4872 LANDSCAPE SUPPLIES-SOAP/PRUNING

SAW/TRAFFIC SIGNS
101553-5500 General Fund 1C1Q-JDN6-MLD4 12/05/2024 28063 25.15 AMAZON CAPITAL SERVICES 4872 LANDSCAPE SUPPLIES-SOAP/PRUNING

SAW/TRAFFIC SIGNS
101553-5520 General Fund 1C1Q-JDN6-MLD4 12/05/2024 28063 362.28 AMAZON CAPITAL SERVICES 4872 OFFICE SUPPLIES-THERMAL RECEIPT PAPER 101220-5500 General Fund 1HQJ-4LR4-CCD1 12/05/2024 28063 68.50 AMAZON CAPITAL SERVICES 4872 IT SUPPLIES-UPS BATTERY 101116-5540 General Fund 1J17-LCPT-HKTW 12/05/2024 28063 40.23 AMAZON CAPITAL SERVICES 4872 ENGINEERING OFFICE SUPPLIES-AIR FRESHENER 101553-5500 General Fund 1J77-1V4N-6GV4 12/05/2024 28063 24.04 AMAZON CAPITAL SERVICES 4872 ENGINEERING OFFICE SUPPLIES-AIR FRESHENER 101550-5500 General Fund 1J77-1V4N-6GV4 12/05/2024 28063 24.05 AMAZON CAPITAL SERVICES 4872 PWW OFFICE SUPPLIES-CALENDARS/CORRECTION TAPE
302561-5500 Water Plant
Operations Fund
1NJY-7D1T-RGXD 12/05/2024 28063 93.09
AMAZON CAPITAL SERVICES 4872 PWW OFFICE SUPPLIES-CALENDARS/CORRECTION TAPE
301560-5500 Water Operations
Fund
1NJY-7D1T-RGXD 12/05/2024 28063 93.09
AMAZON CAPITAL SERVICES 4872 ADMIN SUPPLIES-TRAFFIC SAFETY REFLECTOR

SNAP BANDS
101112-5540 General Fund 1RDX-RTGL-HFPM 12/05/2024 28063 11.95 AMAZON CAPITAL SERVICES 4872 WATER SUPPLIES-CONSERVATION-GARDEN HOSE

NOZZLES
301560-5234 Water Operations
Fund
1TGR-LPNR-DRLH 12/05/2024 28063 325.80
AMAZON CAPITAL SERVICES 4872 ADMIN SUPPLIES-TRAFFIC SAFETY REFLECTOR

SNAP BANDS
101112-5540 General Fund 1137-H733-MMRD 12/05/2024 28064 222.70 AMAZON CAPITAL SERVICES 4872 REC EVENT SUPPLIES-TREE LIGHTING-SNOW

CONE MACHINE
101671-5234 General Fund 167G-NWF4-M7NM 12/05/2024 28064 97.80 AMAZON CAPITAL SERVICES 4872 OFFICE SUPPLIES-PAPER/MARKERS 101220-5500 General Fund 16KQ-VDHL-T7H6 12/05/2024 28064 37.37 AMAZON CAPITAL SERVICES 4872 OFFICE SUPPLIES-MARKER HOLDER 101220-5500 General Fund 17KH-6WND-J1HX 12/05/2024 28064 10.85 AMAZON CAPITAL SERVICES 4872 REC EVENT SUPPLIES-HOLIDAY EVENTCARDSTOCK101671-5234 General Fund 1FGL-H33N-9MKR 12/05/2024 28064 28.26 AMAZON CAPITAL SERVICES 4872 REC EVENT SUPPLIES-SPOOKTACULARBATTERIES101671-5234 General Fund 1HJ9-9X6T-LJFV 12/05/2024 28064 29.74 AMAZON CAPITAL SERVICES 4872 REC EVENT SUPPLIES-SPOOKTACULAR-STICKERS 101671-5234 General Fund 1HTK-HC66-KQK9 12/05/2024 28064 18.33 AMAZON CAPITAL SERVICES 4872 REC EVENT SUPPLIES-SPOOKTACULARWRISTBANDS101671-5234 General Fund 1J6M-DJ9W-J1JL 12/05/2024 28064 18.48 AMAZON CAPITAL SERVICES 4872 REC EVENT SUPPLIES-HOLIDAY EVENT-SANTA SUIT
101671-5234 General Fund 1JN4-CLCW-9MR9 12/05/2024 28064 90.52 AMAZON CAPITAL SERVICES 4872 REC EVENT SUPPLIES-SPOOKTACULARDYE/TABLECLOTHS101671-5234 General Fund 1KHM-NVVH-LPJ6 12/05/2024 28064 96.38 AMAZON CAPITAL SERVICES 4872 OFFICE SUPPLIES-DRY ERASE MARKERS 101220-5500 General Fund 1LDR-WMQP-XDQ1 12/05/2024 28064 20.46 AMAZON CAPITAL SERVICES 4872 ENGINEERING OFFICE SUPPLIES-WEEKLY

PLANNER
101550-5500 General Fund 1MCJ-46QM-P3KP 12/05/2024 28064 10.85 AMAZON CAPITAL SERVICES 4872 REC EVENT SUPPLIES-SPOOKTACULAR-LIGHTS 101671-5234 General Fund 1MDF-TXQK-JYL1 12/05/2024 28064 10.32 AMAZON CAPITAL SERVICES 4872 REC EVENT SUPPLIES-SPOOKTACULARORNAMENTS101671-5234 General Fund 1N9Q-Y7XT-R9D6 12/05/2024 28064 76.35 Check No. 28063
Check Total: 1263.89
Check No. 28064
Agenda Item No. 10 Page 12 of 20 CC Agenda 12-16-2024
Disbursements for 12/5/2024 Attachment C
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount AMAZON CAPITAL SERVICES 4872 REC EVENT SUPPLIES-SPOOKTACULAR-LIGHTS 101671-5234 General Fund 1QVL-LQLQ-M1PT 12/05/2024 28064 56.52 AMAZON CAPITAL SERVICES 4872 REC EVENT SUPPLIES-HOLIDAY EVENT TICKETS 101671-5234 General Fund 1R4M-VHQJ-GFFQ 12/05/2024 28064 16.63 AMAZON CAPITAL SERVICES 4872 STREETS SUPPLIES- GLOVE CLIPS 101551-5520 General Fund 1RXH-JFTF-6X7C 12/05/2024 28064 18.48 AMAZON CAPITAL SERVICES 4872 ADMIN SUPPLIES-TRAFFIC SAFETY REFLECTOR

SNAP BANDS
101112-5540 General Fund 1TMD-3HRY-M9KC 12/05/2024 28064 92.88 AMAZON CAPITAL SERVICES 4872 LANDSCAPE SUPPLIES-PRK MACHINE-PACKING TAPE
101553-5540 General Fund 1VMM-NGD1-7NVJ 12/05/2024 28064 13.38 AMAZON CAPITAL SERVICES 4872 REC EVENT SUPPLIES-SENIOR LUNCHEONTABLECLOTH 101671-5234 General Fund 1VMM-NGD1-
RWHW
12/05/2024 28064 53.48
AMAZON CAPITAL SERVICES 4872 OFFICE SUPPLIES-DRY ERASE MARKERS 101220-5500 General Fund 1WW7-CQL1-C461 12/05/2024 28064 19.94 AMAZON CAPITAL SERVICES 4872 STREET SUPPLIES-SANDBAG FILLERS 101551-5520 General Fund 1X4K-7K9V-G9WM 12/05/2024 28064 135.36 AMAZON CAPITAL SERVICES 4872 ENGINEERING SUPPLIES- AQUASEAL ADHESIVE 101550-5540 General Fund 1XF6-GPF3-GNNK 12/05/2024 28064 9.73 AMAZON CAPITAL SERVICES 4872 REFUSE SUPPLIES-CHAIN LUBE 304563-5520 Solid Waste Operations Fund
19HL-CWG1-G7FQ 12/05/2024 28065 86.99
ADS, LLC 2479 NOV'24 WASTEWATER FLOW MONITORING

SERVICES
303562-5204 Wastewater
Operations Fund
25021 22815-1124 12/05/2024 138867 1,822.00
WHITNEY PLUMBING 5796 WATER LINE REPAIR-E. CARMEL GREEN 301560-5204 Water Operations Fund
25128 2887 12/05/2024 138868 6,500.00
AIRGAS USA LLC 1134 FLEET CYLINDER RENTAL - INDUSTRIAL

ACETYLENE
101554-5215 General Fund 5512838758 12/05/2024 138869 32.30 ANDRADE IRONWORKS, INC 5369 FM REPAIRS-MORANDA PICKLEBALL COURT'S POSTS
101780-5212 General Fund 288 12/05/2024 138870 1,650.00 AQUA-FLO SUPPLY 260 LANDSCAPE REPAIRS-WEATHERMATIC

SMARTLINK
101553-5523 General Fund SI2436579 12/05/2024 138871 811.93 AQUA-FLO SUPPLY 260 LANDSCAPE SUPPLIES-HUNTER PGP ULTRA POP UP
101553-5520 General Fund SI2438924 12/05/2024 138871 172.61 CALIFORNIA UNDERGROUND FACILITIES 5112 CA STATE FEE FOR REGULATORY COSTS - DIG

ALERT SVCS
303562-5204 Wastewater
Operations Fund
24-251807 12/05/2024 138872 17.14
CALIFORNIA UNDERGROUND FACILITIES 5112 CA STATE FEE FOR REGULATORY COSTS - DIG

ALERT SVCS
301560-5204 Water Operations
Fund
24-251807 12/05/2024 138872 17.14
CALIFORNIA WOOD RECYCLING 291 NOVEMBER 16-30, 2024 WOOD AND BRUSH BILLING 304563-5233 Solid Waste Operations Fund
145437C-IN 12/05/2024 138873 1,601.15
Check Total: 1184.81
Check No. 28065
Check Total: 86.99
Check No. 138867
Check Total: 1822.00
Check No. 138868
Check Total: 6500.00
Check No. 138869
Check Total: 32.30
Check No. 138870
Check Total: 1650.00
Check No. 138871
Check Total: 984.54
Check No. 138872
Check Total: 34.28
Check No. 138873
Agenda Item No. 10 Page 13 of 20 CC Agenda 12-16-2024
Disbursements for 12/5/2024 Attachment C
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount CDCE, INC 3941 PD PAT VEHICLE BODY MOUNT AND INSTALL 101440-5526 General Fund 13731 143119 12/05/2024 138874 414.49 CENTRAL COAST POWERSPORTS LLC 1057 AUTOMOTIVE REPAIRS-PDPAT MOTORCYCLE 80023-BATTERY
101554-5215 General Fund 25704 12/05/2024 138875 293.98 CHAPIN'S 302 STREETS ROAD MATERIAL-CONCRETE 101551-5524 General Fund 2494689 12/05/2024 138876 339.11 CLEAN HARBORS ENV. SERVICES 1302 SEPTEMBER 13-14, 2024 WASTE COLLECTION

SERVICES
304563-5220 Solid Waste
Operations Fund
1005205402 12/05/2024 138877 497.50
CSI SERVICES, INC 2761 PHWA UNDERWATER INSPECTION SERVICES 302561-5204 Water Plant Operations Fund
25046 16210 12/05/2024 138878 5,400.00
DON & TOM'S FRONT END 332 AUTOMOTIVE REPAIRS-PWS VEH 2130-ALIGNMENT 101554-5215 General Fund 35174 12/05/2024 138879 175.00 DON & TOM'S FRONT END 332 AUTOMOTIVE REPAIRS-PWL VEH 5106-ALIGNMENT 101554-5215 General Fund 35176 12/05/2024 138879 175.00 ESPINO ROOFING INC 5291 249 E "A" ST REPAIRS-METAL DECK SYSTEM 213781-5212 Housing Successor Agency Fund
4174 12/05/2024 138880 2,800.00
F. MORTON PITT COMPANY 918 PD UNIFORMS-K MORA-POLOS/PATCHES 101441-5214 General Fund 19056 12/05/2024 138881 160.53 F. MORTON PITT COMPANY 918 PD UNIFORMS-J FLORIANO-NAME/LOGO 101442-5214 General Fund 19057 12/05/2024 138881 14.01 FGL ENVIRONMENTAL 339 BACTI/INORGANIC/MISC WATER QUALITY

ANALYSIS COPH
301560-5230 Water Operations
Fund
25007 418214A 12/05/2024 138882 287.00
FGL ENVIRONMENTAL 339 BACTI/MISC WATER QUALITY ANALYSIS PHWA 302561-5230 Water Plant Operations Fund
25008 418752A 12/05/2024 138882 85.00
FGL ENVIRONMENTAL 339 BACTI/MISC WATER QUALITY ANALYSIS COPH 301560-5230 Water Operations Fund
25007 419006A 12/05/2024 138882 145.00
FGL ENVIRONMENTAL 339 BACTI/MISC WATER QUALITY ANALYSIS PHWA 302561-5230 Water Plant Operations Fund
25008 419007A 12/05/2024 138882 85.00
FIDELITY SECURITY LIFE INSURANCE CO 5465 DEC'24 REG EE VISION PREMIUMS 501000-2245 Payroll Clearing Fund
166557363 12/05/2024 138883 1,247.16
Check Total: 1601.15
Check No. 138874
Check Total: 414.49
Check No. 138875
Check Total: 293.98
Check No. 138876
Check Total: 339.11
Check No. 138877
Check Total: 497.50
Check No. 138878
Check Total: 5400.00
Check No. 138879
Check Total: 350.00
Check No. 138880
Check Total: 2800.00
Check No. 138881
Check Total: 174.54
Check No. 138882
Check Total: 602.00
Check No. 138883
Agenda Item No. 10 Page 14 of 20 CC Agenda 12-16-2024
Disbursements for 12/5/2024 Attachment C
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount FIDELITY SECURITY LIFE INSURANCE CO 5465 DEC'24 RETIREE VISION PREMIUMS 501000-2245 Payroll Clearing Fund
166557543 12/05/2024 138883 448.54
FRONTIER COMMUNICATIONS 4230 209-150-4426-011398-5 UTILITY BILL-PHWA PHONE 302561-5300 Water Plant Operations Fund
398-5 11102024 12/05/2024 138884 111.17
MARTIN NEVAREZ 5606 EMBROIDERY SERVICES-PATCHES ON

SHORTS/HATS
101673-5214 General Fund 10212401 12/05/2024 138885 221.47 GRAINGER INC 345 LANDSCAPE SUPPLIES-DRY WIPES/CLEANING
TOWELS
101553-5520 General Fund 9327631652 12/05/2024 138886 202.58 HARTMAN, HELEN M 5511 NOVEMBER 2024 BALLET RECREATION CLASS 101000-2214 General Fund 12042024-NOV24 12/05/2024 138887 882.00 HERNANDEZ, LAURA 4723 NOVEMBER 2024 MEDICAL REIMBURSEMENT 101110-5160 General Fund 11272024

HERNANDEZ
12/05/2024 138888 382.70
HOME DEPOT CREDIT SERVICES 115 WATER PLANT SUPPLIES-NM IN-USE COVER 302561-5520 Water Plant Operations Fund
3024660 12/05/2024 138889 20.63
HOME DEPOT CREDIT SERVICES 115 LANDSCAPE SUPPLIES-WIRE CONNECTORS/4FT

USB CABLE
101553-5500 General Fund 3807939 12/05/2024 138889 10.90 HOME DEPOT CREDIT SERVICES 115 LANDSCAPE SUPPLIES-WIRE CONNECTORS/4FT

USB CABLE
101553-5520 General Fund 3807939 12/05/2024 138889 42.08 HOME DEPOT CREDIT SERVICES 115 LANDSCAPE SUPPLIES-GLOVES 101553-5510 General Fund 5325219 12/05/2024 138889 219.76 HOME DEPOT CREDIT SERVICES 115 WATER PLANT SUPPLIES-SEAL/NIP/WASHER 302561-5520 Water Plant Operations Fund
5901739 12/05/2024 138889 6.21
HOME DEPOT CREDIT SERVICES 115 766 JANE DR SUPPLIES-SWITCHES/SWITCH PLATES
101780-5520 General Fund 6040793 12/05/2024 138889 194.94 HOME DEPOT CREDIT SERVICES 115 WATER PLANT SUPPLIES-US POLY FLAG SET 302561-5520 Water Plant Operations Fund
6211203 12/05/2024 138889 10.90
HOME DEPOT CREDIT SERVICES 115 STREETS SUPPLIES- 40V XGT BATTERY 101551-5526 General Fund 6233898 12/05/2024 138889 433.91 HOME DEPOT CREDIT SERVICES 115 FM SUPPLIES-PD REMODEL-2X4 LUMBER/ CEILING TILES
101780-5700 General Fund 7014395 12/05/2024 138889 587.24 HOME DEPOT CREDIT SERVICES 115 FM SUPPLIES-PD REMODEL-CEILING TILES 101780-5700 General Fund 7014401 12/05/2024 138889 568.04 HOME DEPOT CREDIT SERVICES 115 LANDSCAPE SUPPLIES- SOIL PROBE 101553-5526 General Fund 7154856 12/05/2024 138889 37.13 HOME DEPOT CREDIT SERVICES 115 LANDSCAPE SUPPLIES-DIGGING SHOVEL/CLEAN

OUT SHOVEL
101553-5520 General Fund 7187820 12/05/2024 138889 86.05 HOME DEPOT CREDIT SERVICES 115 STREETS SUPPLIES-40V XGT BATTERY 101551-5526 General Fund 7816522 12/05/2024 138889 433.91 HOME DEPOT CREDIT SERVICES 115 WATER PLANT SUPPLIES-SCREWS/STRAPS/FLAG

KIT/ETC
302561-5520 Water Plant
Operations Fund
7901446 12/05/2024 138889 495.62
HOME DEPOT CREDIT SERVICES 115 LANDSCAPE SUPPLIES- 5 GAL UTILITY CAN 101553-5520 General Fund 7945475 12/05/2024 138889 84.67 HOME DEPOT CREDIT SERVICES 115 STREETS SUPPLIES-40V XGT BATTERY 101551-5526 General Fund 8502687 12/05/2024 138889 849.97 Check Total: 1695.70
Check No. 138884
Check Total: 111.17
Check No. 138885
Check Total: 221.47
Check No. 138886
Check Total: 202.58
Check No. 138887
Check Total: 882.00
Check No. 138888
Check Total: 382.70
Check No. 138889
Agenda Item No. 10 Page 15 of 20 CC Agenda 12-16-2024
Disbursements for 12/5/2024 Attachment C
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount HOME DEPOT CREDIT SERVICES 115 LANDSCAPE SUPPLIES-HUSKY RATCHET SET 101553-5520 General Fund 8904226 12/05/2024 138889 10.89 HOME DEPOT CREDIT SERVICES 115 WATER PLANT SUPPLIES-HUSKY WALL MOUNT HOOK
302561-5520 Water Plant
Operations Fund
903425 12/05/2024 138889 65.42
HOME DEPOT CREDIT SERVICES 115 WATER PLANT SUPPLIES-CARBIDE ABRASIVE BLADE
302561-5520 Water Plant
Operations Fund
9475993 12/05/2024 138889 32.71
HOME DEPOT CREDIT SERVICES 115 WATER PLANT SUPPLIES-DRILL BIT KITS 302561-5520 Water Plant Operations Fund
9662190 12/05/2024 138889 160.11
INDUSTRIAL BOLT AND SUPPLY 1532 WATER PLANT SUPPLIES-HEX BOLTS/NUTS 302561-5520 Water Plant Operations Fund
258891-1 12/05/2024 138890 2,921.10
KIMBALL MIDWEST 366 AUTOMOTIVE SUPPLIES-INVENTORY-LOCK

NUTS/WASHERS/ET
101554-5523 General Fund 102843997 12/05/2024 138891 445.55 KLOERIS, SHARON 368 NOVEMBER 2024 SENIOR EXERCISE CLASSES 101671-5204 General Fund 12042024-NOV24 12/05/2024 138892 715.00 LEDDY POWER SYSTEMS, INC 3956 WW SEAVIEW LIFT STATION GENERATOR MAINT 303562-5204 Wastewater Operations Fund
3210 12/05/2024 138893 1,642.65
LEDDY POWER SYSTEMS, INC 3956 WW PLEASANT VALLEY LIFT STATION GENERATOR MAINT
303562-5204 Wastewater
Operations Fund
3211 12/05/2024 138893 1,474.75
LEDDY POWER SYSTEMS, INC 3956 WW SURFSIDE PORTABLE GENERATOR ANNUAL TEST
303562-5204 Wastewater
Operations Fund
3212 12/05/2024 138893 1,719.92
LOWE'S 1841 FM SUPPLIES-KORKY 3-IN ADJUSTABLE FLA-322

HIDEAWAY
101780-5520 General Fund 00780 12/05/2024 138894 25.89
LOWE'S 1841 FM SUPPLIES-PD REMODEL-4 STRANDED BLACK
WIRE
101780-5700 General Fund 901301 12/05/2024 138895 41.08 LOWE'S 1841 FM SUPPLIES-PD REMODELPAINT/SWITCHES/BUMPERS/ETC101780-5700 General Fund 970023 12/05/2024 138895 385.83 LOWE'S 1841 FM SUPPLIES-GRAFFITI CLEAN UP-PAINT 101780-5520 General Fund 970030 12/05/2024 138895 105.16 LUNA METAL CONCEPTS 2581 WATER PLANT-GRATES 23.75X63"X1.75" 1/4 BARS 301560-5520 Water Operations Fund
03718 12/05/2024 138896 2,687.55
MARIPOSA TREE MANAGEMENT, INC 5598 AUGUST 2024 TREE LANDSCAPE SERVICES 101553-5212 General Fund 25084 3622 12/05/2024 138897 32,890.00 MARIPOSA TREE MANAGEMENT, INC 5598 JULY 2024 TREE LANDSCAPE SERVICES 101553-5212 General Fund 25084 3623 12/05/2024 138897 19,800.00 MARIPOSA TREE MANAGEMENT, INC 5598 SEPTEMBER 2024 TREE LANDSCAPE SERVICES 101553-5212 General Fund 25084 3677 12/05/2024 138897 58,506.00 Check Total: 4351.09
Check No. 138890
Check Total: 2921.10
Check No. 138891
Check Total: 445.55
Check No. 138892
Check Total: 715.00
Check No. 138893
Check Total: 4837.32
Check No. 138894
Check Total: 25.89
Check No. 138895
Check Total: 532.07
Check No. 138896
Check Total: 2687.55
Check No. 138897
Agenda Item No. 10 Page 16 of 20 CC Agenda 12-16-2024
Disbursements for 12/5/2024 Attachment C
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount MARIPOSA TREE MANAGEMENT, INC 5598 OCTOBER 2024 TREE LANDSCAPE SERVICES 101553-5212 General Fund 25084 3709 12/05/2024 138897 76,203.00 MCQUEEN-LEGOHN, MARTHA 5473 NOVEMBER 2024 MEDICAL REIMBURSEMENT 101110-5160 General Fund 11272024

MCQUEEN
12/05/2024 138898 278.22
EDILIA MORROW 5600 HMIRP REBATE R-0989-04 FOR 800 MYRNA DRIVE 209334-5243 Neighborhood Preservation Fund
11122024
MORROW
12/05/2024 138899 1,500.00
PAVEMENT COATINGS CO 3949 OCT'24 WB CHANNEL ISLANDS BLVD PAVEMNT

REHAB PRJCT
204551-5700 Gas Tax Fund 25107 PC1000011148 12/05/2024 138900 41,832.20 PAVEMENT COATINGS CO 3949 OCT'24 WB CHANNEL ISLANDS BLVD PAVEMNT

REHAB PRJCT
210551-5700 Grant Tracking Fund 25107 PC1000011148 12/05/2024 138900 246,567.63 PAVEMENT COATINGS CO 3949 RETENTION-OCT'24 WB C.I. BLVD PAVEMNT REHAB PRJCT
204000-2204 Gas Tax Fund PC1000011148
RETEN
12/05/2024 138900 -14,419.99
PAVEMENT COATINGS CO 3949 OCT'24 WB CHANNEL ISLANDS BLVD PAVEMNT

REHAB PRJCT
210551-5700 Grant Tracking Fund 25107 PCI000011233 12/05/2024 138900 40,823.89 PAVEMENT COATINGS CO 3949 OCT'24 WB CHANNEL ISLANDS BLVD PAVEMNT

REHAB PRJCT
204551-5700 Gas Tax Fund 25107 PCI000011233 12/05/2024 138900 6,926.11 PAVEMENT COATINGS CO 3949 RETENTION-OCT'24 WB C.I. BLVD PAVEMNT REHAB PRJCT
204000-2204 Gas Tax Fund PCI000011233
RETEN
12/05/2024 138900 -2,387.50
PEREZ, JOSE 333 11/29/24 PD CAR WASH SERVICES 101441-5215 General Fund 11292024-PD 12/05/2024 138901 350.00 PORTASTOR 3947 10/27/24-11/26/24 P-089 STORAGE CONTAINER

SERVICES
101442-5220 General Fund 439211 12/05/2024 138902 85.00 PORTASTOR 3947 11/04/24-12/03/24 T-003 STORAGE CONTAINER

SERVICES
101672-5220 General Fund 439873 12/05/2024 138903 85.00 PORTASTOR 3947 11/4/24-12/3/24/24 STORAGE CONTAINER SERVICES 101672-5220 General Fund 439874 12/05/2024 138904 164.00 PRIME BUILDING MATERIALS INC 516 STREETS ROAD MATERIAL-FILL SAND 101551-5524 General Fund 330922 12/05/2024 138905 347.52 PSR ENVIRONMENTAL SERVICES, INC 557 11/4/24 MONTHLY UST UNDRGRND OPR VISUAL

INSPECTION
101554-5403 General Fund 19946 12/05/2024 138906 275.00 RAMIREZ, MAURICIO 5440 NOVEMBER 2024 TAEKWONDO RECREATION CLASS
101000-2214 General Fund 12042024 RAMIREZ 12/05/2024 138907 1,157.63 Check Total: 187399.00
Check No. 138898
Check Total: 278.22
Check No. 138899
Check Total: 1500.00
Check No. 138900
Check Total: 319342.34
Check No. 138901
Check Total: 350.00
Check No. 138902
Check Total: 85.00
Check No. 138903
Check Total: 85.00
Check No. 138904
Check Total: 164.00
Check No. 138905
Check Total: 347.52
Check No. 138906
Check Total: 275.00
Check No. 138907
Agenda Item No. 10 Page 17 of 20 CC Agenda 12-16-2024
Disbursements for 12/5/2024 Attachment C
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount REFUND 99999 CUST ACCT CLOSED- WATER/SEWER/TRASH UTIL

DEP REFND
301000-1202 Water Operations
Fund
17487 12/05/2024 138908 98.17
REFUND 99999 CUST ACCT CLOSED- WATER/SEWER/TRASH UTIL

DEP REFND
301000-1202 Water Operations
Fund
41121 12/05/2024 138909 59.52
REFUND 99999 CUST ACCT CLOSED- WATER/SEWER/TRASH UTIL

DEP REFND
301000-1202 Water Operations
Fund
50006 12/05/2024 138910 97.91
REFUND 99999 CUST ACCT CLOSED- WATER/SEWER/TRASH UTIL

DEP REFND
301000-1202 Water Operations
Fund
40795 12/05/2024 138911 107.11
REFUND 99999 CUST ACCT CLOSED- WATER/SEWER/TRASH UTIL

DEP REFND
301000-1202 Water Operations
Fund
38353 12/05/2024 138912 98.17
REFUND 99999 CUST ACCT CLOSED- WATER/SEWER/TRASH UTIL

DEP REFND
301000-1202 Water Operations
Fund
41095 12/05/2024 138913 80.27
REFUND 99999 CUST ACCT CLOSED- DUMPSTER RENTAL DEP
REFND
301000-1202 Water Operations
Fund
50074 12/05/2024 138914 296.83
REFUND 99999 CUST ACCT CLOSED- WATER/SEWER/TRASH UTIL

DEP REFND
301000-1202 Water Operations
Fund
18301 12/05/2024 138915 151.08
REFUND 99999 CUST ACCT CLOSED- WATER/SEWER/TRASH UTIL

DEP REFND
301000-1202 Water Operations
Fund
34021 12/05/2024 138916 16.53
REFUND 99999 UB 1017878 142 ELFIN GREEN 301000-1202 Water Operations Fund
17936 12/05/2024 138917 89.22
Check Total: 1157.63
Check No. 138908
Check Total: 98.17
Check No. 138909
Check Total: 59.52
Check No. 138910
Check Total: 97.91
Check No. 138911
Check Total: 107.11
Check No. 138912
Check Total: 98.17
Check No. 138913
Check Total: 80.27
Check No. 138914
Check Total: 296.83
Check No. 138915
Check Total: 151.08
Check No. 138916
Check Total: 16.53
Check No. 138917
Check Total: 89.22
Check No. 138918
Agenda Item No. 10 Page 18 of 20 CC Agenda 12-16-2024
Disbursements for 12/5/2024 Attachment C
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount REFUND 99999 CUST ACCT CLOSED- WATER/SEWER/TRASH UTIL

DEP REFND
301000-1202 Water Operations
Fund
41143 12/05/2024 138918 91.47
RUBIO'S WELDING SERVICE 3305 3Y BIN REPAIRS 304563-5211 Solid Waste Operations Fund
4797 12/05/2024 138919 1,235.00
RUBIO'S WELDING SERVICE 3305 3Y/6Y PARTIAL BIN REPAIRS 304563-5211 Solid Waste Operations Fund
4796 12/05/2024 138920 2,430.00
RUSH TRUCK CENTER, SYLMAR 4448 AUTOMOTIVE SUPPLIES-INVENTORY-HOSE ASSY 101554-5523 General Fund 3038878097 12/05/2024 138921 299.06 RUSH TRUCK CENTER, SYLMAR 4448 AUTOMOTIVE REPAIRS-PWSW VEH 9128-

CONNECTOR
101554-5215 General Fund 3038910098 12/05/2024 138921 471.86 RUSH TRUCK CENTER, SYLMAR 4448 AUTOMOTIVE REPAIRS-PWSW VEH 9111-DEF LEAK 101554-5215 General Fund 3038951850 12/05/2024 138921 3,106.29 RUSH TRUCK CENTER, SYLMAR 4448 AUTOMOTIVE REPAIRS-PWL VEH 5104-LED/MOUNT 101554-5523 General Fund 3039648312 12/05/2024 138921 204.47 RUSH TRUCK CENTER, SYLMAR 4448 AUTOMOTIVE REPAIRS-PWSW VEH 9112-

FILTER/GASKET/ETC
101554-5523 General Fund 3039658233 12/05/2024 138921 936.64 SC COMMERCIAL, LLC 3581 701.1 GALLONS DIESEL/450 GALLONS UNLEADED 101554-5522 General Fund 25004 IN-0000024510 12/05/2024 138922 4,582.87 STATE OF CALIFORNIA 5221 NOVEMBER 2024 ECA LOAN PAYMENT 304563-5805 Solid Waste Operations Fund
12099 12/05/2024 138923 724.39
STATE OF CALIFORNIA 5221 NOVEMBER 2024 ECA LOAN PAYMENT 301560-5805 Water Operations Fund
12099 12/05/2024 138923 724.39
STATE OF CALIFORNIA 5221 NOVEMBER 2024 ECA LOAN PAYMENT 101111-5805 General Fund 12099 12/05/2024 138923 1,417.85 STATE OF CALIFORNIA 5221 NOVEMBER 2024 ECA LOAN PAYMENT 303562-5805 Wastewater Operations Fund
12099 12/05/2024 138923 724.39
STATE OF CALIFORNIA 5221 NOVEMBER 2024 ECA LOAN PAYMENT 304000-2303 Solid Waste Operations Fund
12099 12/05/2024 138923 4,318.73
STATE OF CALIFORNIA 5221 NOVEMBER 2024 ECA LOAN PAYMENT 503000-2303 General LTD Account Group
12099 12/05/2024 138923 8,453.04
STATE OF CALIFORNIA 5221 NOVEMBER 2024 ECA LOAN PAYMENT 301000-2303 Water Operations Fund
12099 12/05/2024 138923 4,318.73
STATE OF CALIFORNIA 5221 NOVEMBER 2024 ECA LOAN PAYMENT 303000-2303 Wastewater Operations Fund
12099 12/05/2024 138923 4,318.73
STATE READY MIX INC. 586 CONCRETE DUMP FEES 304563-5233 Solid Waste Operations Fund
55507 12/05/2024 138924 131.00
STATE READY MIX INC. 586 CONCRETE/MISC PRODUCT DUMP FEES 304563-5233 Solid Waste Operations Fund
55592 12/05/2024 138924 262.00
Check Total: 91.47
Check No. 138919
Check Total: 1235.00
Check No. 138920
Check Total: 2430.00
Check No. 138921
Check Total: 5018.32
Check No. 138922
Check Total: 4582.87
Check No. 138923
Check Total: 25000.25
Check No. 138924
Check Total: 393.00
Check No. 138925
Agenda Item No. 10 Page 19 of 20 CC Agenda 12-16-2024
Disbursements for 12/5/2024 Attachment C
12/9/2024
Vendor Name Vendor # Invoice General Description GL Account Fund PO Number Invoice Number Check Date Check/EFT # Detail Amount STATE READY MIX INC. 586 CONCRETE DUMP FEES 304563-5233 Solid Waste Operations Fund
55590 12/05/2024 138925 131.00
SUPERIOR SECURITY SPECIALISTS, INC 2266 5/13/24 CITY HALL COMMUNICATION PANEL IT RESET
101780-5212 General Fund 248260 12/05/2024 138926 195.00 TELCOM INC 445 DISPATCH RADIO INFRSTCTR PRJCTEQUIP/MATERIAL DEP211441-5700 American Rescue Plan Act Fund
18596 18596 12/05/2024 138927 33,695.94
NANCY K BOHL INCORPORATED 3035 DECEMBER 2024 PD EMPLOYEE SUPPORT

SERVICES
210440-5204 Grant Tracking Fund INV102566 12/05/2024 138928 750.00 TKM ENGINEERING 5159 NOV'24 GENERAL TRAFFIC ENGINEERING

SERVICES
204551-5204 Gas Tax Fund 20240131 1337 12/05/2024 138929 234.00 TKM ENGINEERING 5159 NOV'24 GENERAL TRAFFIC ENGINEERING

SERVICES
101550-5204 General Fund 20240131 1337 12/05/2024 138929 912.60 TKM ENGINEERING 5159 NOV'24 GENERAL TRAFFIC ENGINEERING

SERVICES
101551-5204 General Fund 20240131 1337 12/05/2024 138929 23.40 TOSHIBA AMERICA BUSINESS SOLUTIONS 1050 7/28/24-10/27/24 COPIER SERVICES-ESTUDIO4555C 304563-5220 Solid Waste Operations Fund
6110498 12/05/2024 138930 32.13
TOSHIBA AMERICA BUSINESS SOLUTIONS 1050 7/28/24-10/27/24 COPIER SERVICES-ESTUDIO4555C 301560-5220 Water Operations Fund
6110498 12/05/2024 138930 32.13
TOSHIBA AMERICA BUSINESS SOLUTIONS 1050 7/28/24-10/27/24 COPIER SERVICES-ESTUDIO4555C 303562-5220 Wastewater Operations Fund
6110498 12/05/2024 138930 32.13
TRAFFIC TECHNOLOGIES LLC 1021 STREETS SUPPLIES-TRAFFIC CONES 101551-5520 General Fund 49184 12/05/2024 138931 1,011.93 TRAFFIC TECHNOLOGIES LLC 1021 STREETS SUPPLIES-TRAFFIC CONES 101553-5520 General Fund 49184 12/05/2024 138931 1,011.93 TRAFFIC TECHNOLOGIES LLC 1021 WATER SUPPLIES-28" ORANGE REFLECTIVE CONES
301560-5520 Water Operations
Fund
49188 12/05/2024 138931 1,556.81
TYLER TECHNOLOGIES 4190 OCT'24 TYLER/MUNIS ERP SERVICES 304563-5700 Solid Waste Operations Fund
13865 045-490313 12/05/2024 138932 1,110.00
TYLER TECHNOLOGIES 4190 OCT'24 TYLER/MUNIS ERP SERVICES 303562-5700 Wastewater Operations Fund
13865 045-490313 12/05/2024 138932 1,110.00
TYLER TECHNOLOGIES 4190 OCT'24 TYLER/MUNIS ERP SERVICES 301560-5700 Water Operations Fund
13865 045-490313 12/05/2024 138932 1,110.00
TYLER TECHNOLOGIES 4190 OCT'24 TYLER/MUNIS ERP SERVICES 101111-5700 General Fund 13865 045-490313 12/05/2024 138932 1,110.00 TYLER TECHNOLOGIES 4190 SEP/OCT'24 TYLER/MUNIS ERP SERVICES 303562-5700 Wastewater Operations Fund
13865 045-490882 12/05/2024 138932 555.00
TYLER TECHNOLOGIES 4190 SEP/OCT'24 TYLER/MUNIS ERP SERVICES 301560-5700 Water Operations Fund
13865 045-490882 12/05/2024 138932 555.00
TYLER TECHNOLOGIES 4190 SEP/OCT'24 TYLER/MUNIS ERP SERVICES 304563-5700 Solid Waste Operations Fund
13865 045-490882 12/05/2024 138932 555.00
TYLER TECHNOLOGIES 4190 SEP/OCT'24 TYLER/MUNIS ERP SERVICES 101111-5700 General Fund 13865 045-490882 12/05/2024 138932 555.00 Check Total: 131.00
Check No. 138926
Check Total: 195.00
Check No. 138927
Check Total: 33695.94
Check No. 138928
Check Total: 750.00
Check No. 138929
Check Total: 1170.00
Check No. 138930
Check Total: 96.39
Check No. 138931
Check Total: 3580.67
Check No. 138932
Agenda Item No. 10 Page 20 of 20 CC Agenda 12-16-2024
DATE: December 16, 2024
TO: Honorable City Council
FROM: James Vega, City Manager
Brian Popovich, City Manager’s Administrative Analyst
SUBJECT: AUTHORIZATION FOR THE CITY MANAGER TO SIGN A LETTER OF INTENT TO PARTICIPATE IN THE COUNTY OF VENTURA MULTIJURISDICTIONAL HAZARD MITIGATION PLAN UPDATE 2027 RECOMMENDATION:

It is recommended that City Council authorize the City Manager to sign the Letter of Intent to participate in the County of Ventura Multi-Jurisdictional Hazard Mitigation Plan (MJHMP) Update 2027.

BACKGROUND/ANALYSIS:

The Ventura County Multi-Jurisdictional Hazard Mitigation Plan (MJHMP) is a federally required planning document developed under the Disaster Mitigation Act of 2000. The planning document identifies and assesses the County’s (and each City) risks and vulnerability from natural hazards and provides a comprehensive mitigation strategy that includes prioritization of actions and projects that can be implemented over the long term to reduce risk and future losses from natural disaster. Additionally, the MJHMP is a prerequisite for receiving certain forms of federal disaster assistance.

The MJHMP is updated every five years, with the County of Ventura beginning its efforts for the 2027 update. Since the 2022 MJHMP, new requirements have been introduced to address stakeholder engagement, climate change impacts, social vulnerability, and enhanced mitigation strategies.

Participation in the 2027 MJHMP update ensures the City of Port Hueneme will:
• Identify hazards specific to its jurisdiction and address unique vulnerabilities. • Conduct public outreach to ensure stakeholder and community engagement. • Align the mitigation strategies with federal requirements and incorporate climate change considerations.
• Maintain eligibility for federal disaster mitigation grants.

Agenda Item No. 11 Page 1 of 4 CC Agenda 12-16-2024
Multi-Jurisdictional Hazard Plan Update
December 16, 2024

Page 2 ends

The attached Letter of Intent, prepared for submission to the California Governor’s Office of Emergency Services (CalOES), confirms the City's commitment to actively participate in the MJHMP update. This includes fulfilling FEMA requirements, incorporating climate change considerations under SB 379 and SB 1000, and updating the City’s General Plan Safety Element per AB 2140.

FISCAL IMPACT:

Authorizing the City to participate in the County of Ventura MJHMP update will enable the City to meet FEMA requirements, which would ensure the City is eligible for qualified disaster assistance funding. Partnering with the County and other agencies is anticipated to result in reduced costs to meet this requirement.

STRATEGIC PLAN:

Primary Strategic Pillar(s) and Initiative(s):

Safe, Secure, & Beautiful Community
• Increase levels of emergency preparedness and education Strategic Partnerships
• Establish a mechanism for engagement, information sharing, dialogue and ongoing cooperative decision-making with key stakeholders ATTACHMENTS:

A. County of Ventura Multi-Jurisdictional Hazard Mitigation Plan Letter of Intent Agenda Item No. 11 Page 2 of 4 CC Agenda 12-16-2024
250 N Ventura Road, Port Hueneme, CA 93041 │ 805-986-6500 │cityofporthueneme.org

December 16, 2024
CALIFORNIA GOVERNOR’S OFFICE OF EMERGENCY SERVICES
Hazard Mitigation Assistance Branch
Attention: Hazard Mitigation Grant
3650 Shriver Avenue
Mather, CA 95655
Re: LETTER OF INTENT TO PARTICIPATE IN: COUNTY OF VENTURA MULTIJURISDICTIONAL HAZARD MITIGATION PLAN UPDATE 2027 Dear State Hazard Mitigation Officer,
Federal Emergency Management Agency’s (FEMA) Local Mitigation Plan requirements under 44 CFR Part 201.6 specifically identify criteria that allow for multi-jurisdictional hazard mitigation plans, as many issues are better resolved by evaluating hazards more comprehensively through coordination at a county, regional, or watershed level. The City of Port Hueneme is submitting this Letter of Intent to confirm that it has agreed to participate in the County of Ventura Multi-jurisdictional Hazard Mitigation Planning.

Furthermore, as a condition of participation in this project, the City of Port Hueneme agrees to meet the requirements for mitigation plan as identified in 44 CFR Part 201, FEMA’s new Local Mitigation Planning Policy Guide (fema.gov) (2022), and FEMA’s Local Mitigation Planning Handbook (fema.gov) (2013). Climate change will be incorporated to comply with SB 379 and SB 1000; and the final plan will be incorporated into the Safety Element of our jurisdictional General Plan to comply with AB 2140. The City of Port Hueneme agrees to provide such cooperation as is necessary and in a timely manner to the County of Ventura to complete the plan in conformance with FEMA requirements.

The City of Port Hueneme understands that it must actively engage in the following planning process, as more fully described in FEMA’s Local Mitigation Planning Handbook, including but not limited to:
• Identification of hazards unique to the jurisdiction and not addressed in the master planning document;
• The conduct of a vulnerability analysis and an identification of risks, where they differ from the general planning area;
Attachment A
Agenda Item No. 11 Page 3 of 4 CC Agenda 12-16-2024
Hazard Mitigation Plan Letter of Intent

Page 2 ends

250 N Ventura Road, Port Hueneme, CA 93041 │ 805-986-6500 │cityofporthueneme.org • The formulation of mitigation goals responsive to public input and development of mitigation actions complementary to those goals. A range of actions must be identified specific for each jurisdiction;
• Demonstration that there has been proactively offered an opportunity for participation in the planning process by all community stakeholders (examples of participation include relevant involvement in any planning process, attending meetings, contributing research, data, or other information, commenting on drafts of the plan, etc.);
• Documentation of an effective process to maintain and implement the plan; and • Formal adoption of the Multi-Jurisdictional Hazard Mitigation Plan by the jurisdictions’ governing body (each jurisdiction must officially adopt the plan).

Therefore, with a full understanding of the obligations incurred by participating in the FEMA hazard mitigation planning process as a participant in a multi-jurisdictional plan update; I, James Vega, commit the City of Port Hueneme to the County of Ventura Multi-Jurisdictional Hazard Mitigation Plan Update 2027.

This document is executed this 16th day of December, 2024.

Please contact me at (805) 986-6501 or via e-mail at
[email protected] with questions.

Sincerely,
James Vega
City Manager
City of Port Hueneme
(805) 986-6501
[email protected]
Agenda Item No. 11 Page 4 of 4 CC Agenda 12-16-2024
DATE: December 16, 2024
TO: Honorable City Council
FROM: James Vega, City Manager
Tony Stewart, AICP, Community and Economic Development Director Jose Coyotl, Associate Planner
SUBJECT: ADOPT A RESOLUTION GRANTING SPECIAL USE PERMIT NO. 12-24

TO ALLOW STEPHEN CAMPBELL, ON BEHALF OF THE FAMILIES OF ALASKA FLIGHT 261 TO HOST THE ALASKA FLIGHT 261 25TH

ANNIVERSARY MEMORIAL EVENT AND FIND THE EVENT EXEMPT

FROM CEQA
RECOMMENDATION:

It is recommended the City Council:

1. Open the public hearing to take testimonial and documentary evidence; and

2. Close the public hearing and consider the evidence; and

3. Approve the Waiver of Fees associated with the event; and

4. Adopt a Resolution approving Special Use Permit No. 12-24 (Alaska Flight 261 25th Anniversary Memorial Event); and

4. Find the project (Special Use Permit No. 12-24) to be categorically exempt from CEQA; and

5. Take such additional, related, action that may be desirable.

BACKGROUND/ANALYSIS:

The applicant, Mr. Stephen Campbell, on behalf of the Families of Alaska Flight 261, is requesting approval to use a portion of Hueneme Beach Park, specifically the area containing the Alaska Flight 261 Monument, the adjacent beach, and Beach Parking Lot "B," for a memorial service commemorating the 25th anniversary of the Alaska Flight 261 disaster on January 30 and 31, 2025. Additionally, the applicant requests permission to use portions of the Holiday Inn Express hotel parking lot for ancillary events related to the memorial service schedule.

As this marks the 25th anniversary of the Alaska Airlines Flight 261 tragedy, the applicant anticipates approximately 300 participants. Given the size of the event and its duallocation nature, a Special Use Permit is required, in line with similar events held within the City. Notably, all fees associated with this event are recommended to be waived due Agenda Item No. 12 Page 1 of 15 CC Agenda 12-16-2024
Special Use Permit No. 12-24 – Alaska Flight 261 25th Anniversary Memorial Event December 16, 2024

Page 2 ends

to the City’s history of supporting these events and their importance to the community and families.

The Holiday Inn Express, located at 350 E. Port Hueneme Road, will serve as the primary accommodation for the families and friends of Alaska Flight 261. It will also act as the meeting point for various caravan trips planned during the two-day memorial. Specifically, a portion of the hotel's parking lot to the south of the building will be used for lunch and dinner service on Thursday, January 30, 2025. Should inclement weather prevent the memorial service from taking place at the Alaska Flight 261 Monument within Hueneme Beach Park, the service will be relocated to the hotel’s parking lot facing Seaview Street on Friday, January 31, 2025.

Weather permitting, the memorial service is scheduled to take place at 3:00 p.m. on Friday, January 31, 2025, at the Alaska Flight 261 Monument area at Hueneme Beach Park. The event will be centered around the Monument, with seating for attendees arranged in the sandy beach area to the south. A standing and staging area for the memorial will be located between Beach Parking Lot "B" and the walkway leading to the Monument. The program will feature a choir and musicians, positioned under a tent along the walkway leading to the Monument area. Preparations for the event will begin at 2:00 p.m. on Thursday, January 30, with cleaning and waxing of the Monument area. Beach Parking Lot "B" will be available to memorial service guests free of charge, and temporary restrooms will be installed nearby.

FISCAL IMPACT:

In recognition of the significance of this event to the families and friends of Alaska Flight 261, as well as the Port Hueneme community, the $1,341 City Council Special Use Permit application fee is recommended to be waived. Additionally, as in previous years, the fee waiver would include waiver of fees for parking at Beach Parking Lot B on January 30 and 31, 2025. However, the City will still experience financial benefits through itinerant merchant licenses and sales taxes generated by local spending, including hotel accommodations at the Holiday Inn Express for event guests. No substantial City maintenance or capital expenditures are anticipated for this event.

STRATEGIC PLAN:

Primary Strategic Pillar(s) and Initiative(s):

Optimal Levels of Service for Residents and Businesses
• Support and establish programs and events that create a strong sense of community pride and a connection to our history and heritage ATTACHMENTS:

A. Resolution
B. SUP 12-24 Application Packet
C. Public Hearing Notice
Agenda Item No. 12 Page 2 of 15 CC Agenda 12-16-2024
RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT HUENEME,

CALIFORNIA, DEEMING A TEMPORARY EVENT EXEMPT FROM THE

CALIFORNIA ENVIRONMENTAL QUALITY ACT AND CONDITIONALLY
APPROVING SPECIAL USE PERMIT NO. 12-24 (ALASKA FLIGHT 261 25TH ANNIVERSARY MEMORIAL EVENT), LOCATED AT 550 E. SURFSIDE DRIVE (HUENEME BEACH) AND 350 E. PORT HUENEME ROAD (HOLIDAY INN

EXPRESS HOTEL)
WHEREAS, A public hearing was held as required by law to consider issuance of a Special Use Permit (“SUP”) allowing the project known as the “Alaska Flight 261 25th Anniversary Memorial Event", to be located at the Alaska Flight 261 Monument and adjacent sandy beach area and Beach Parking Lot "B" at Hueneme Beach Park, with ancillary events to be held at the Holiday Inn Express hotel located at 350 E. Port Hueneme Road, herein referred to as “Project”, from 7:00 a.m. to approximately 7:00 p.m. on Thursday, January 30 and Friday, January 31, 2025 (with additional setup and cleanup time before and after the main event); and WHEREAS, the proposed Project represents a discretionary action subject to the environmental review requirements of the California Environmental Quality Act (“CEQA”) of 1970, as amended (Pubic Resources Code § et. seq.), and by operation of § 15381 of Title 14 to the California Code of Regulations, the City Council of the City of Port Hueneme is deemed “Lead Agency” for the purposes of CEQA; and
WHEREAS, City staff has recommended the City Council find the Project exempt from CEQA as it establishes rules and procedures to permit operation of existing facilities; minor temporary use of land; ensures maintenance, restoration and protection of the environment; and regulates normal operations of facilities for public gatherings, and is therefore categorically exempt from further CEQA review under California Code of Regulations Title 14 §§15301, 15304 (e) 15308, 15323, and 15332 as an urban infill project; and WHEREAS, the proposed Project is deemed consistent with, and furthers the objectives and policies of the City’s General Plan and zoning regulations; and WHEREAS, the City Council considered the effects of the Project on the regional need for public services, and available fiscal and environmental resources before deciding on this matter; and
WHEREAS, City staff recommended conditional approval of the Project and Special Use Permit Application No. SUP 12-24.

NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF PORT HUENEME, CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1: Under the provisions of PHMC Sections 10355 et. seq., the City Council finds and declares that:

A. Prior to rendering a decision on any aspect of the Project, the City Council duly considered the following:

1. All testimony, written and oral, received in conjunction with that certain public hearing conducted on December 16, 2024, which testimony, by this reference, is incorporated herein.

Attachment A
Agenda Item No. 12 Page 3 of 15 CC Agenda 12-16-2024
CC Resolution No. ___, Page 2 of 8

2. That certain written staff report submitted by the Community and Economic Development Department and exhibits hereto dated December 16, 2024, which report, by this reference, are incorporated herein.

B. That the Conditions of Approval specified in Section "G" below are reasonably related to the use of the premises for which this Special Use Permit is to be issued.

C. On the basis of evidence hereinafter listed, all administrative procedures and public participation requirements prescribed in Title 7, Division 1, of the Government Code of the State of California, Article X, PHMC § 10352, and Division 13 of the California Public Resources Code commencing with § 21050, and Title 14 of the California Code of Regulations commencing with § 15000, as such procedures and requirements pertain to this Project and CEQA have been lawfully satisfied.

D. That the California Coastal Act is intended to protect natural and scenic resources; promote public safety, health, and welfare; and protect public and private property, wildlife, marine fisheries, other ocean resources, and the natural environment and that California Coastal Commission regulations establish the standards by which proposed land developments or other activities are evaluated to ensure consistency with the Act and that the Local Coastal Program (LCP) policy group of primary concern identified in the City’s LCP for the Project area involving the temporary use of Hueneme Beach Park and associated Parking Lots "B" is “Shoreline Access/Recreation and Visitor-Serving Facilities.” On the basis of the evaluations presented below, the City Council for the City of Port Hueneme finds the proposed Project consistent with and furthering the objectives of Chapter 3 of the California Coastal Act of 1976:

1. VISITOR SERVING AND RECREATION FACILITIES
A. Coastal Act (Public Resource §§ 30212.5, 30213, and 30220):

Wherever appropriate and feasible, public facilities, including parking, shall be distributed throughout an area to mitigate against the impacts of overuse of any single area. Lower-cost visitor and recreational facilities shall be protected, encouraged, and where feasible, provided. Developments providing public recreational opportunities are preferred. Coastal areas suited for wateroriented recreational activities that cannot readily be provided in inland water areas shall be protected for such uses.

B. Consistency Statement: According to local LCP policy for Hueneme Beach Park (Area A), Section 4.b. Resource Protection Zone Policies, any temporary Development or Special Use Permit projects at Hueneme Beach Park shall be focused west of Parking Lot “C”. The proposed temporary use Project will be located within Hueneme Beach Parking Lot “B” and within the Alaska Flight 261 Memorial; however, attendees will be required to not trespass on the nearby dune areas, which complies with this policy. In addition, the proposed Project will not block public access to the beach.

Agenda Item No. 12 Page 4 of 15 CC Agenda 12-16-2024
CC Resolution No. ___, Page 3 of 8
E. That the following environmental findings are made based on upon the staff report dated December 16, 2024, and the project descriptions:

1. The Project is consistent with City’s General Plan and its policies including the Project’s land use designation as Open Space; it is also consistent with the Park-Reserve Zoning classification for the Project site.

2. The Project involves property located within City’s jurisdictional boundaries on parking lot sites and the Project is surrounded by urban uses and Park/Pacific Ocean.

3. The SUP property is not known to be listed by any regulatory agency as having value as a habitat for endangered, rare, or threatened species.

4. Approving the Project would not result in any significant effects related to traffic, noise, air quality, or water quality.

5. The Project is not expected to result in substantial pollution.

6. The Project area can be adequately served by all required utilities and public services.

7. The Project will not exceed the existing or planned capabilities of the sewage system.

8. The Project will not exceed the existing or planned capabilities of the solid waste system.

9. The Project is not expected to create unavoidable health hazards nor expose people to substantial health hazards.

10. The Project is not expected to have an adverse impact on adequate fire protection services.

11. The Project will not result in a population that exceeds a level of service of one officer per 1,000 residents nor result in the average response time to emergency calls to exceed three minutes.

F. That because of the facts and conclusions identified in this Resolution, the Project is categorically exempt as it establishes rules and procedures to permit operation of existing facilities; minor temporary use of land; ensure maintenance, restoration and protection of the environment; and regulate normal operations of facilities for public gatherings, and therefore categorically exempt from further CEQA review under California Code of Regulations Title 14 §§ 15301, 15304 (e) 15308, 15323, and 15332.

G. That the City Council of the City of Port Hueneme hereby grants and approves this SUP 12-24 as a “Temporary Use” by operation of PHMC § 10355(A)(2), subject to the following conditions:

1. City approval is granted to the Applicant for the Temporary Use and location as described in the Staff Report dated December 16, 2024.

Areas that may be subsequently desired by Applicant beyond that Agenda Item No. 12 Page 5 of 15 CC Agenda 12-16-2024
CC Resolution No. ___, Page 4 of 8
designated shall receive prior authorization and coordination by the City’s Director of Community and Economic Development (“Director”).

2. Stephen Campbell on behalf of the Families of Alaska Flight 261 is deemed the Applicant’s authorized representative who shall be available at all times while the SUP event is in progress; or, the Applicant must designate in writing to the Director a minimum of one week before starting the event as to who the authorized event representative will be and who will have complete authority to represent and to act on behalf of the Applicant. Said authorized representative must be present at the site at all times while the event is in progress. Whenever the representative is not present during any particular time when the event is occurring, orders may be given by the Director, Public Works Director, and/or Chief of Police or their authorized staff. These orders must be obeyed by the representative who may have charge of the particular event activity to which the orders are given. If in the opinion of the Director, Public Works Director, or Chief of Police, or authorized staff that the SUP event poses a threat to the public health, safety, or welfare, or violates any of the conditions herein or other law, said official(s) may give orders to said representative to immediately correct the situation or terminate the proceedings and return the site to its pre-event condition. The Applicant and/or representative are responsible for the actions of his/her event employees, volunteers, contractors, and subcontractors.

3. The Applicant shall take all reasonable measures to protect public and private property that may result from activities of the SUP event. The area used for the event must be cleaned of event debris and returned to its pre-event condition no later than the morning following the day of the event, or other time as approved by the Director.

4. Prior to the SUP event, the Applicant shall provide proof that it has secured all necessary permits and licenses for the event including County Health permits, if required, to the satisfaction of the Director.

5. Any vendors associated with this SUP shall obtain a City business license prior to the event.

6. Any on-site or off-site advertising, signage, banners, or similar special promotions or marketing for the SUP event in the City must be approved by the Director before use and kept in a continuous state of good condition and repair, clean and free of graffiti as determined by the Director.

7. Unless otherwise permitted by Director, the Applicant will not make, or cause to be made, any alterations to Property covered by the SUP, or any part thereof, without Director’s prior written consent.

8. The Applicant, at its sole cost and expense, comply with all of the requirements of all federal, state, and local authorities now in force, or which may hereafter be in force, pertaining to the event and will faithfully observe in the use of SUP property all applicable laws. The judgment of any court of competent jurisdiction, or the admission of Applicant in any Agenda Item No. 12 Page 6 of 15 CC Agenda 12-16-2024
CC Resolution No. ___, Page 5 of 8
action or proceeding against Applicant, whether City be a party thereto or not, that Applicant has violated any such ordinance or statute in the use of SUP Property will be conclusive of that fact as between City and Applicant.

9. A 20-foot clear emergency vehicles access road shall be provided and maintained for the duration of the event. The emergency vehicles access road shall be unobstructed by guest and staff vehicles. Road barriers shall be movable by one person without special knowledge or extraordinary effort.

10. All temporary electrical systems shall be permitted in accordance with the local building and safety department and maintained in accordance with the National Electrical Code.

11. The Applicant is hereby made aware of the potential sensitive beach resources located seaward of the beach pedestrian concrete walkways located east of Beach Parking Lot "B” extending to the “J” Street Drain and down-coast to the Ormond Beach area. The Applicant and the SUP event participants are prohibited from traversing or otherwise disturbing dune areas within these locations. In addition, participants at the Applicant’s SUP event shall not operate vehicles off-road or outside the paved beach lots and streets. In this regard, the operation of vehicles over undesignated areas is strictly prohibited without the prior approval of the Director.

12. The Applicant and participants at the SUP event shall comply with all applicable State, Federal, and local rules and regulations, government laws, and ordinances relating to the activity and all other ordinances and laws of the City, which among other things, prohibits disorderly conduct; point source noise outside of the Hueneme Beach Park that exceeds the noise regulations outlined in Port Hueneme Municipal Code; undesignated vehicles on the beach or off the public right-of-way; public intoxication or consumption of alcoholic beverages, animals on the sandy beach; fires on the beach; and boisterous, threatening, or profane and indecent language.

13. If requested by the Public Works Director, the Applicant shall obtain an Encroachment Permit for the use of any public street right-of-way prior to the SUP event taking place.

14. The Applicant shall not use stakes or any other means to secure the temporary tents, equipment or any other amenity related to the subject event that will penetrate the pavement within the parking lots without express permission by the Public Works Director. Driving stakes into the pavement within Oceanview Drive rights-of-way is strictly prohibited.

15. Free parking in Beach Parking Lot 'B' will only be available on the event dates, from 7:00 A.M. until closing.

Agenda Item No. 12 Page 7 of 15 CC Agenda 12-16-2024
CC Resolution No. ___, Page 6 of 8

16. Prior to the SUP event, the Applicant shall provide evidence of liability insurance naming the City of Port Hueneme as additionally insured in the following form:

Type of Insurance Limits (combined single)
Commercial general liability: $1,000,000 ($2,000 General Aggregate) Workers compensation: Statutory limits
a. Commercial general liability insurance will meet or exceed the requirements of the most current ISO Forms. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies must be endorsed to name CITY, its officials, and employees as
“additional insureds” under said insurance coverage and to state that such insurance will be deemed “primary” such that any other insurance that may be carried by CITY will be excess thereto. Such insurance will be on an “occurrence,” not a “claims made,” basis and will not be cancelable except upon thirty (30) days prior written notice to CITY except for nonpayment of premiums which may be cancelable upon ten (10) day notice.
b. Applicant will furnish to CITY duly authenticated Certificates of Insurance and Endorsements evidencing maintenance of the insurance required under this License and such other
evidence of insurance or copies of policies as may be
reasonably required by CITY from time to time. Insurance must be placed with insurers with a current A.M. Best
Company Rating equivalent to at least a Rating of “A:VII.” Certificate(s) must reflect that the insurer will provide thirty (30) day notice of any cancellation of coverage. Applicant will require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word “endeavor” with regard to any notice
provisions.
c. All policies required by this SUP must allow CITY, as additional insured, to satisfy the self-insured retention (“SIR”) and deductible of the policy in lieu of Applicant (as the named insured) should Applicant fail to pay the SIR or deductible requirements. The amount of the SIR or deductible is subject to the approval of the City Attorney and the Finance Director.

Applicant understands and agrees that satisfaction of this requirement is an express condition precedent to the
effectiveness of this Agreement. Failure by Applicant as primary insured to pay its SIR or deductible constitutes a material breach of this SUP. Should CITY pay the SIR or deductible on Applicant’s behalf upon the Applicant’s failure or refusal to do so in order to secure defense and indemnification Agenda Item No. 12 Page 8 of 15 CC Agenda 12-16-2024
CC Resolution No. ___, Page 7 of 8
as an additional insured under the policy, CITY may include such amounts as damages in any action against Applicant for breach of this SUP in addition to any other damages incurred by CITY due to the breach.

H. Pursuant to Public Resources Code § 30510, the City Council of the City of Port Hueneme hereby reiterates its intent to implement the Local Coastal Program and amendments thereto in a manner fully consistent with the California Coastal Act.

I. The approvals granted herein shall not become effective until all rights of appeal have been exhausted including appeal within 10 days following the date of receipt by the Coastal Commission of the City’s Notice of Final Action on this matter pursuant to PHMC § 10356(D).

SECTION 2: The Mayor, or presiding officer, is authorized to sign this Resolution signifying its adoption by the City Council of the City of Port Hueneme and the City Clerk, or her duly appointed deputy, may attest thereto.

SECTION 3: This Resolution shall take effect immediately upon its passage.

SECTION 4: The City Clerk shall certify to the adoption of this Resolution and enter it into the book of original Resolutions.

PASSED, APPROVED, AND ADOPTED, this 16th day of December, 2024. , Mayor
ATTEST:
________________________________
Georgianna Nicole Alvarez
City Clerk
Agenda Item No. 12 Page 9 of 15 CC Agenda 12-16-2024
CC Resolution No. ___, Page 8 of 8

CERTIFICATION

STATE OF CALIFORNIA )
COUNTY OF VENTURA ) SS.

CITY OF PORT HUENEME )
I, Georgianna Nicole Alvarez, City Clerk of the City of Port Hueneme, California, do hereby certify that the foregoing Resolution No. ____ was duly adopted at the regular meeting of the City Council on the 16th day of December 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Dated:

Georgianna Nicole Alvarez
City Clerk
Agenda Item No. 12 Page 10 of 15 CC Agenda 12-16-2024
Attachment B
Agenda Item No. 12 Page 11 of 15 CC Agenda 12-16-2024
Agenda Item No. 12 Page 12 of 15 CC Agenda 12-16-2024
Agenda Item No. 12 Page 13 of 15 CC Agenda 12-16-2024
This Page Intentionally Left Blank
Agenda Item No. 12 Page 14 of 15 CC Agenda 12-16-2024

CITY OF PORT HUENEME NOTICE OF PUBLIC HEARING
NOTICE IS HEREBY GIVEN that a public hearing will be held by the City Council of the City of Port Hueneme to consider an application by Stephen Campbell, on behalf of the Families of Alaska Flight 261, 1309 128th Street, Seattle, WA 98146, for a temporary Special Use Permit (SUP) No. 12-24 for a two-day memorial service (“Alaska Flight 261 25th Anniversary Memorial Event”) to take place on Thursday, January 30, and Friday, January 31, 2025, from 7:00 a.m. to 7:00 p.m. The memorial event will occur at Beach Parking Lot B, the Alaska Flight 261 Monument area, and the adjacent beach, as well as the Holiday Inn Express Parking Lot (350 E. Port Hueneme Road) for setup and ancillary activities on Thursday, January 30, 2025. The main memorial service will be held at the Alaska Flight 261 Monument area and adjacent beach at 3:00 p.m. on Friday, January 31, 2025. If weather conditions prevent the service from taking place at the original beach and Alaska Flight 261 Monument area location, the memorial service will be relocated to the Holiday Inn Express.

SAID PUBLIC HEARING will be held as an in-person meeting on Monday, December 16, 2024, at 6:30 p.m., or as soon as possible thereafter. Any person may attend this public hearing in the City Council Chambers located at 250 North Ventura Road, Port Hueneme. All members of the public are privileged to attend and be heard on this matter by submitting written or live public comments.

ENVIRONMENTAL REVIEW: The proposed SUP is deemed categorically exempt from review under the California Environmental Quality Act under California Code of Regulations Title 14 §§15301, 15304 (e) 15308, and 15323, because it establishes rules and procedures to permit the operation of existing facilities; minor temporary use of land; ensures maintenance, restoration, and protection of the environment; and regulates normal operations of facilities for public gatherings. The SUP is therefore categorically exempt from further CEQA review under California Code of Regulations Title 14 §§15301, 15304 (e) 15308, and 15323 ADDITIONAL INFORMATION on this project may be obtained from the Department of Community Development, City of Port Hueneme, 250 N. Ventura Road, Port Hueneme, California 93041, telephone (805) 986-6548.

Be advised, if you challenge the actions taken on the project described in this Notice in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this Notice, or in written correspondence delivered to the City Clerk at, or prior to, the public hearing.

In compliance with the Americans with Disabilities Act, if you need special assistance to participate at this meeting, please contact the office of the City Clerk, at (805) 986-6503, or the California TDD Relay Service. Notification at least 48 hours prior to the meeting will enable the City to make reasonable arrangements to allow participation. /s/Georgianna Nicole Alvarez, City Clerk
Published: December 3, 2024
Attachment C
Agenda Item No. 12 Page 15 of 15 CC Agenda 12-16-2024
DATE: December 16, 2024
TO: Honorable City Council
FROM: James Vega, City Manager
Tony Stewart, AICP, Community and Economic Development Director SUBJECT: INTRODUCTION OF AN ORDINANCE TO ADD SECTIONS 10590-10594 TO CHAPTER 4 OF ARTICLE X OF THE PORT HUENEME MUNICIPAL

CODE, AS THEY RELATE TO RESIDENTIAL NEIGHBORHOOD INFILL

OVERLAY STANDARDS, AND TO APPROVE THE ADDENDUM TO THE

ENVIRONMENTAL IMPACT REPORT PREVIOUSLY PREPARED FOR

THE GENERAL PLAN UPDATE PROJECT
RECOMMENDATION:

It is recommended the City Council:

1. Open the public hearing to take testimonial and documentary evidence; and

2. Close the public hearing and consider the evidence; and

3. Introduce for first reading, by title only, waiving further reading of an Ordinance entitled, “An Ordinance of the City Council of the City of Port Hueneme, California to add Sections 10590-10594 to Chapter 4 of Article X of the Port Hueneme Municipal Code, as they relate to residential Neighborhood Infill Overlay Standards, adding the Neighborhood Infill Overlay zoning designation to certain properties, and repealing the West End Specific Plan; and

4. Approve the Addendum to the Environmental Impact Report that was previously prepared for the Port Hueneme General Plan Update project (State Clearinghouse [SCH] # 2021040164); and

5. Take such additional, related, action that may be desirable.

BACKGROUND/ANALYSIS:

This is the final set of proposed amendments to Article X of the Port Hueneme Municipal Code – the “Zoning Ordinance” as they relate to residential land use standards, with the previous sets having been heard by the City Council at their November 4 and 18, 2024 hearings.

As noted at the November 4 and 18 hearings, the state of California continues to pass revised and new legislation related to the production of new housing units for a variety of household types and different income levels. In addition, the Council approved a Agenda Item No. 13 Page 1 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 2 ends

comprehensive update to the City’s General Plan, including a new Housing Element, in October 2021 (with the Housing Element being approved by the state’s Department of Housing and Community Development (“HCD”) in October 2022). The Housing Element is required per state law, to provide programs and policies geared towards meeting the City’s updated Regional Housing Needs Assessment (RHNA) of 125 new residential units, which are required within several income categories as follows:

City of Port Hueneme’s RHNA
Income Category # of Units Needed
Extremely Low (0-30% of County median income) 16
Very Low (31-50%) 10
Low (51-80%) 16
Moderate (81-120%) 18
Above Moderate (Over 120% of median income) 65
TOTAL 125
The Housing Element contains 21 programs to facilitate maintenance and preservation of existing housing units, and for the creation of new ones. To date, all but one of these programs has now been complied with, with the last program being discussed this evening.

Port Hueneme Municipal Code Section 10006 requires that any change that may affect the land uses of properties situated in the Coastal Zone constitute amendment to the City’s Local Coastal Program (LCP). Therefore, since the some of the amendments to be acted upon by the City Council would affect properties in the City’s Coastal Zone, the City’s LCP will also require amendment. Staff anticipates completing the LCP amendment in Spring 2025, and will bring it back to the City Council for review at that time.

Neighborhood Infill Overlay (“NIO”) Introduction
To expand opportunities for additional housing opportunities, particularly affordable housing in the built-out City, Housing Element Program No. 8, “Small Lot Consolidation and Missing Middle Housing” was approved. This program encourages development of new infill units and the consolidation of small parcels to facilitate larger-scale redevelopments that are compatible with the scale of existing surrounding neighborhoods and accommodate additional housing units. To achieve this, Program No. 8 calls for the City to implement a “missing middle” housing overlay and the promotion of lot splits and/or mergers to develop more affordable housing and a diverse range of housing options.

For reference, “missing middle” housing is a term used to describe residential development types that were once popular across the United States, but which became forgotten or “missing” when single-family and/or high-density multi-family residential development types became popular after World War II and construction of these smaller multi-unit residential building types often became illegal to construct. However, in many areas, including the portion of Port Hueneme that is the subject of this discussion, such Agenda Item No. 13 Page 2 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 3 ends

residential development types (which include a mix of single-family, and small-scale multifamily residential, such as duplexes, triplexes, courtyard units and small apartment buildings) continue to exist and thrive. Currently, there is a growing trend to encourage the maintenance and expansion of such areas due to the character and livability provided, and because they create a diverse mix of unit types at a variety of affordability levels.

Additionally, an “overlay” zone is a set of development standards that is “overlaid” atop the standards of the underlaying zone. In the case of the Neighborhood Infill Overlay, property owners will have the option to maintain their properties as they exist per existing underlying zoning standards, or to improve them per the new NIO standards, provided the design standards in the NIO are met.

The proposed NIO standards generally overlay the oldest residential neighborhoods in the City, which have underlying zones of single-family (R-1), Limited Multifamily (R-2), Residential Mixed Use (R-4) and Transitional Residential/Coastal-Related Industry (R-5).

It should be noted that the NIO area only applies to these areas and not to other areas in the R-1, R-2, R-4 or R-5 zones elsewhere in the City.

The majority of the properties in the NIO area were developed prior to the current zoning standards taking effect and therefore, some may have become legal non-conforming over the years. Since the NIO standards will be less restrictive with regard to setbacks and parking (refer to Table 1, below for a comparison of existing and proposed development standards), the NIO standards may allow certain properties that became nonconforming to again be conforming. However, this would need to be determined on a case by case basis, at the time development on the particular property was proposed.

It is anticipated that if all conditions are met (i.e., lot mergers occur and development actually occurred at the maximum density), approximately 723 additional residential units could be accommodated in the NIO area.

The NIO area also overlays the West Ventura Specific Plan area. This specific plan area was developed in 1978, primarily as a code enforcement tool to identify and eliminate blighted properties for future redevelopment purposes. However, since the targeted redevelopment activities have since occurred and the City’s Redevelopment Agency was disbanded, along with the rest of the redevelopment agencies by the state in 2012, the specific plan is outdated and recommended to be superseded with adoption of the NIO.

Refer to Figure 1, below, for the proposed location of the Neighborhood Overlay Zone and to Figure 2, below, for the proposed Zoning Map, showing the NIO area in relation to the rest of the City.

Agenda Item No. 13 Page 3 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 4 ends

Figure 1
Neighborhood Infill Overlay
Agenda Item No. 13 Page 4 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 5 ends

Figure 2
Proposed Zoning Map
Agenda Item No. 13 Page 5 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 6 ends

Summary of NIO Standards
Similar to the Mixed Use Residential (R-4) standards which were recently acted upon by the City Council, the purpose of the NIO standards is to encourage infill development that will be compatible with the surrounding low-scale single- and multi-family residential development and to set forth objective design standards. However, unlike the R-4 standards, the NIO standards do not contain any standards for non-residential uses.

Table 1, below, compares NIO standards where they differ with the standards of the underlying R-1, R-2, R-4 or R-5 standards (note: standards which do not change are not listed and note further, residential uses in the R-5 zone are subject to the same development standards of the R-2 zone).

Table 1
Comparison of Differing Development Standards
Standard NIO Zone R-1 Zone R-2/R-5 Zones R-4 Zone
Front
Setback
Lots under
10,000 sf: 10 ft.
20 feet 20 feet 0 (except to meet
parking/landscaping
Lots 10,000+sf: requirements)
15 ft.

Interior Side
Setback
4 feet 5 feet 5 feet 4 feet where abutting
residential for first 2.5
stories, plus 1
additional foot
setback for each
additional story.

Side –
Reversed
Corner Lot
50% of front
yard setback to
immediate rear
50% of front yard
setback to
immediate rear
50% of front yard
setback to
immediate rear
50% of front yard
setback to immediate
rear when abutting
residential
Rear
Setback
10 feet 15 feet 15 feet 4 feet where abutting
residential for first 2.5
stories, plus 1
additional foot
setback for each
additional story.

Max. Bldg.

Height
Same as
underlying zone
30 feet 30 ft/2 stories 45 feet, or 60 feet if
min. 1/3 of building is
residential (plus 1
additional story to 75’
with incentives)
Density Lots under
10,000 sf: 30
units/acre
1 unit/lot 15 units/acre 25 units/acre (30
units/acre with
incentives)
Lots 10,000+ sf:
20 units/acre (or
Agenda Item No. 13 Page 6 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 7 ends

25 units/acre if
R-4)
Min. Parking
Required
Up to 2
bedrooms: 1
space/unit.
2 or more
bedrooms: 2
spaces/unit
2 spaces/unit in
a garage
Up to 2
bedrooms: 1.5
spaces/unit.
2+ bedrooms: 2
spaces/unit.

Sfds, townhomes,
condos both
spaces/unit in
garage.

Apartments, 1
unit covered. All
multifamily must
also have
minimum 1 guest
space/2 units
Same as underlying
zone
Objective design standards. Objective standards are proposed to be included within the NIO standards, such as in Sections 10592 (J) and (K) and 10593, below. To recap from the November 18, 2024 discussion of the proposed R-4 standards, objective design standards are recommended for several reasons. First, state regulations continue to take away local land use authority by requiring more and more land uses to be allowed “by right” instead of being vetted through a development review process. However, laws such as AB1397 and SB2162 allow a local jurisdiction to establish objective design standards which can be applied in the same objective manner by staff when reviewing all development applications. Such standards also enable design features, such as minimum open space and landscaping requirements, to be used to enhance the quality of life for the residents in new developments. Objective design standards are also a tool to be used to ensure new development will be high quality and safe and attractive for a variety of users.

The proposed text for the NIO standards is provided below.

Proposed NIO Ordinance Text
Park K. – Neighborhood Infill Overlay Zone
10590 Purpose
The purpose of the Neighborhood Infill Overlay (NIO) is to implement Housing Element programs and address housing needs within the City of Port Hueneme by encouraging the development of new housing in existing neighborhoods. The NIO implements the Housing Element programs by providing development regulations to support and provide incentives for the development of multi-family residential units on smaller lots throughout the overlay zone.

Agenda Item No. 13 Page 7 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 8 ends

10591 - Location of Zone
The Neighborhood Infill Overlay contains requirements that apply to new residential development which increases the built residential density on the site located in the areas identified in Figure 1, below. Underlying zoning shall apply to development which involves the replacement of or additions to existing units and for new development not pursuing the NIO standards.
10592 - Development Standards
A. Front Yard.

1. Lots smaller than 10,000 gross square feet. There shall be a front yard of not less than 10 feet in depth.

2. Lots larger than 10,000 gross square feet. There shall be a front yard of not less than 15 feet in depth.

3. Porches, stoops, steps, and other architectural elements may encroach up to five (5) feet into the required setback with the provision of a minimum of one (1) street tree (15-gallon minimum size) for each 25 feet of lot width, or other enhanced architectural design or landscaping element acceptable to the approving body.

B. Side Yard.

1. On interior and standard side yards, there shall be a side yard on each side of the building of not less than four (4) feet in width.

2. On reversed corner lots, there shall be a side yard on the street side of the reversed corner lot of not less than fifty (50) percent of the front yard of the lot immediately to the rear of such reversed corner lot, and no accessory building on said reversed corner lot shall project beyond the front yard of the lot immediately to the rear of the reversed corner lot.

C. Rear Yard. There shall be a rear yard of not less than ten (10) feet in depth.

D. Lot Area. The minimum lot area shall be equal to the minimum lot area of the underlying zone.

E. Lot Width. The minimum lot width shall be equal to the minimum lot width of the underlying zone.

F. Lot Depth. The minimum lot depth shall be equal to the minimum lot depth of the underlying zone.

Agenda Item No. 13 Page 8 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 9 ends

G. Height. The maximum building height shall be equal to the maximum building height allowed by the underlying zoning district.

H. Density.

1. Lots smaller than 10,000 gross square feet. The maximum residential density shall be 30 dwelling units per acre.

2. Lots larger than 10,000 gross square feet. The maximum residential density shall be 20 dwelling units per acre where the underlying zoning is R-1, R-2 or R-5, or 25 units per acre where the underlying zoning is R-4.

3. If the aggregate number of dwellings allowed pursuant to this density results in a fraction of a unit, the closest whole number of dwelling units above or below one-half (1/2) shall be used. If the number is precisely one-half, the number shall be rounded up.

I. Parking. Off-street parking requirements for residential uses permitted under this Chapter shall be allowed in accordance with Table 1, below.

Table 1 – Off-Street Parking Requirements in the NIO Overlay Zone Unit Type Off-street Parking Spaces Required
Studio and 1-Bedroom 1 space per unit
2 or more bedrooms 2 spaces per unit, which may be in
tandem
J. Open Space.

1. A minimum of three hundred (300) square feet of open space shall be provided per dwelling unit.

2. For the purposes of the NIO, common open space also includes residential amenities such as shared laundry facilities, indoor gym/recreational areas, and bicycle storage facilities.

3. Open space may be provided as private or common open space or a combination thereof. Up to fifty (50) percent of the required front yard setbacks may be counted toward the provision of open space if dedicated to private use of occupants of a single dwelling unit.

4. Common open space areas shall be a minimum of fifteen (15) feet in any dimension.

5. Private open space areas shall be a minimum of fifty (50) square feet and no smaller than four feet in any dimension.

Agenda Item No. 13 Page 9 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 10 ends

K. Lot Consolidation. To encourage the assemblage of smaller lots into larger lots that can be developed more efficiently, incentives may be provided to a qualifying development, subject to approval by the decision-making authority.

1. Qualifying Lot Consolidation:
a. The merger of two (2) or more existing lots less than 6,000 gross square feet in area, which yields a consolidated parcel of at least sixty (60) feet in width and 100 feet in depth.
b. The merger of two (2) or more existing lots in which at least one (1) parcel is less than 6,000 gross square feet in area, which yields a consolidated parcel at least sixty (6) feet in width and 100 feet in depth.

2. Incentives. One (1) of the following incentives may be provided for developments which include a qualifying lot consolidation. a. For consolidated lots 10,000 gross square feet or larger, an increase of maximum building height by one (1) story or ten (10) feet and an increase in the maximum number of units by 25 percent.
b. For consolidated lots less than 10,000 gross square feet:
i. An increase of the maximum building height by one (1) story or ten (10) feet; or
ii. An increase in the maximum number of units by 25 percent. 10593 - Design Standards
All development approved pursuant to this Chapter shall incorporate and provide the following design standards.

A. Building Location and Orientation.

1. Pedestrian Entrances. Primary pedestrian entrances for each residential unit (or the single primary pedestrian entrance if shared) shall face the public street, as shared pedestrian paseo, or a common courtyard.

2. Creation of Outdoor Spaces. Multiple residential buildings on a single lot shall be arranged to create outdoor spaces such as courtyards, pathways, paseos, and recreational areas, with windows facing the outdoor spaces.

B. Building Form.

Agenda Item No. 13 Page 10 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 11 ends

1. Upper Story Massing. Where the uppermost floor(s) of a building is higher than two stories, floor area of the uppermost floor(s) shall be reduced a minimum of ten (10) percent compared to the ground floor.

2. Roofline Variation. Rooflines along elevations facing a public street shall be articulated using at least one of the following techniques. a. A change in parapet wall or roof height of at least one (1) foot for a distance of at least 30 feet.
b. A change in roof pitch, form, or direction.
c. Inclusion of dormers, gables, parapets, chimneys, and/or varying cornices.

3. Building Plane. In no case shall a building plane visible from the public rightof-way or public open space extend for more than fifty (50) feet without a massing break of a minimum of one (1) foot in depth and four (4) feet in width.

C. Building Façade and Architectural Features.

1. Consistency with Architectural Style. Façade details shall be appropriate to, and consistent with the building’s architectural style and be carried through the entire structure and any accessory structures. Additions or alterations to an existing structure, materials, and finishes (including windows and doors) shall be consistent with the chosen architectural style of the project, or the entire structure shall be remodeled in a single architectural style.

2. Rear and Side Elevation Enhancements. Rear and side elevations that are exposed to public view shall be treated with a minimum of 75 percent of the number of architectural treatments appropriate to the chosen architectural style as the front elevations.

3. Entries. Exterior building entry and entry ways shall be protected with at least one of the following features: overhangs, recesses, porches, trellises, or other weather-protection features covering an area at least three (30) feet in depth and four (4) feet in width.

4. Fenestration. Windows and doors facing a public street or a pedestrianoriented space shall be trimmed, recessed or inset, grouped, and/or incorporate enhancement details such as headers/sills, shutters, trellises, awnings, or Juliet balconies consistent with the chosen architectural style of the project.

5. Color and Material Changes. Material and color changes shall occur at an inside corner, underside of a massing element, or wrapped to an appropriate termination point, such as a roof break, bay window, change in wall plane, or enhanced trim element.

Agenda Item No. 13 Page 11 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 12 ends

6. Glare. Reflective surfaces and materials, such as mirrored glass and polished aluminum are prohibited.

7. Treatment of Accessory Structures. Accessory structures, such as, but not limited to, garages, carports, and enclosures for mechanical and service areas shall be consistent with primary structure(s) on the site. Accessory structures not visible from the street or neighboring properties may deviate from this standard; however, the accessory structure must be painted to match the primary structure.

D. Refuse and Recycling Storage.

1. A dedicated trash enclosure shall be provided for all storage and refuse collection areas which are shared by multiple dwellings on the same lot unless the proposed locations of such areas are completely screened by walls or buildings.

2. All outdoor storage and refuse collection areas shall be screened so that materials stored within these areas shall not be visible from any access street or adjacent property.

3. Refuse enclosures shall be constructed of concrete block, shall be architecturally compatible with the primary structure(s) on-site, shall include opaque, decorative opaque gates, and shall incorporate roof structures to help improve stormwater quality and to screen the enclosure from views from above.

Sizing of the enclosures shall conform to the requirements of the City Public Works Department.

4. Exterior walls of outdoor storage and refuse collection areas shall be treated with anti-graffiti coating and shall be surrounded with landscaping of sufficient size so that a minimum of seventy-five (75) percent of the enclosure is screened within one (1) year.

5. Refuse and recycling material containers stored within individual yards shall be screened from street view.

E. Mechanical and utility equipment. Mechanical and utility equipment (e.g., heating, cooling, antennas, air conditioners, transformers, electric and gas meters, junction boxes, or similar equipment) shall be concealed from public view with landscaping, walls, fencing or, if roof mounted, with roof wells or other architectural features, to the maximum extent feasible and as allowed by the utility service provider.

F. Parking and Access.

Agenda Item No. 13 Page 12 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 13 ends

1. Parking and Loading Standards. With the exception of 10592(I), parking and loading areas for multi-family residential projects shall be designed in accordance with Municipal Code Section 10301.

2. Bicycle Parking. Bicycle parking shall be provided per the minimum California Green Building Standard Code requirements.

3. Treatment of Parking Areas. In order to further the objective of reducing the visual impacts of parking, driveways and garage doors, projects shall incorporate two (2) or more of the following strategies:
a. Locate parking areas and garages completely wrapped with occupiable enclosed buildings, or to the rear of the site.
b. Use of garage doors constructed of enhanced materials other than vinyl, fiberglass, or painted metal.
c. Use of single-car width garage doors.
d. Orient garage doors to the front property line.
e. Design driveways and vehicle maneuvering areas with use of pattern and such materials as integral concrete, slate, brick, pervious concrete, or areas of permeable surface.
f. Locate driveways on the side of the project lot so that the driveway is not the central feature visible form the street.
g. Use of landscaping to screen parking areas form the street.

G. Open Space and Landscaping.

1. Landscaping Standards. All project sites shall be landscaped in accordance with Port Hueneme Municipal Code Section 10302 and the City of Port Hueneme Landscape Design Guidelines.

2. Landscape Elements. To achieve a cohesive appearance of compatibility of a new project with its surroundings, proposed projects in the NIO shall include at least three(3) of the following elements in the landscape plan for the project:
a. Pedestrian-scaled lighting
b. Outdoor firepit with seating area
c. Decorative paving
d. Street tree within the front yard (15 gallon size minimum) Agenda Item No. 13 Page 13 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 14 ends

e. Seating opportunities, such as raised planters and walls.

3. Planting Adjacent to Garage Doors. In townhouse or rowhouse type projects, a planting area of at least six square feet shall be provided adjacent to the garage doors facing alleys and motor court drives to soften the appearance of the building.

4. Fence and Wall Materials. Fences and walls shall be designed pursuant to Port Hueneme Municipal Code Section 10203(E). Fence and wall materials, colors and detailing shall match the architectural style of the building(s) on the site. Plan precision concrete block, permanent chain link fence, and razor, concertina and barbed wire are prohibited.

5. Common Open Space Enclosures. At least 50 percent of outdoor common open space, where provided, shall be open to the sky and not include patio covers, building projections, or similar enclosures that block sunlight and air.

H. Outdoor Lighting.

1. Outdoor lighting shall be installed and maintained along all vehicular access ways and common pedestrian walkways.

2. Lighting of at least one (1) foot-candle (fc) shall be installed and maintained within all covered and enclosed parking areas and shall be screened to reduce glare onto public sidewalks and adjacent properties.

3. Lighting levels shall not be increased by more than one (1) fc onto the public right-of-way and not more than 0.5 fc onto adjacent properties.

4. Lighting shall be of a scale that is appropriate for the intended use (i.e., pedestrian-oriented along walkways) and light fixtures shall be architecturally compatible with the on-site structure(s). Unshielded fixtures shall be prohibited. 10594 - Development Review
The following administrative standards govern the implementation of future development applications utilizing the NIO.

A. Ministerial Review. The following project types shall be reviewed ministerially pursuant to Section 10354.

1. One-family dwellings;

2. Two-family dwellings;

3. Condominiums, apartments, or townhouses comprising six (6) units or fewer; Agenda Item No. 13 Page 14 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 15 ends

4. Developments qualifying for ministerial permitting in accordance with SB35 and AB 2011.

B. Administrative Permit Review. The following project types shall require an Administrative Permit in accordance with Section 10353.

1. Residential projects comprising more than six (6) units and less than 20 units and which are not more than two (2) stories in height;

2. Projects submitted and found eligible for streamlining per state law.

C. Development Permit Review. The following project types shall require a Development Permit in accordance with Section 10352.

1. Residential projects including twenty (20) or more units and/or projects three (3) or more stories, regardless of unit count.

2. Any project which deviates from the objective development and design standards contained in this Chapter.

Community Workshop
On December 11, 2024, City staff along with Rincon staff who assisted with preparing the draft NIO standards, held a workshop at the Orvene S. Carpenter Community Center for property owners in the NIO area. Prior to the workshop, notices about the meeting, in English and Spanish, were mailed out twice to all property owners in the NIO area. Ten residents of the proposed NIO area attended the workshop. The purpose of the workshop was to explain the reason for establishing the NIO (to meet the requirements of the City’s Housing Element and state law to encourage the development of additional infill units), the potential benefits of the NIO for the property owners, and to answer any questions.

Staff also provided the option for Spanish interpretation at the workshop, although none was needed.

Throughout the workshop, the participants asked many questions regarding the benefits of the NIO standards, as well as impacts (primarily parking and privacy impacts from new, 2-3 story units). Other questions asked related to ensuring other codes, such as Fire and Building Codes could be met, the City’s RHNA and how it was calculated and about state housing mandates in general. All questions were answered and the PowerPoint provided at the workshop was loaded onto the City’s website, as requested at the workshop.

Although some comments were received stating concerns with the state housing mandates, no revisions to the proposed standards, which are provided above, were requested.

California Environmental Quality Act (CEQA)
Agenda Item No. 13 Page 15 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 16 ends

An Addendum was prepared to the previously certified Environmental Impact Report (EIR) (State Clearinghouse [SCH] # 2021040164) for the City’s 2021 General Plan Update EIR (Original Project), which was certified on October 4, 2021. This document has been prepared in accordance with the California Environmental Quality Act (CEQA) and Section 15164 of the CEQA Guidelines. This Addendum addresses the proposed modifications proposed in this project (Modified Project) in relation to the previous environmental review document prepared for the Original Project. The City of Port Hueneme (City) was the lead agency for the certified Final EIR and is the lead agency for the environmental review in this Addendum.

This Addendum addresses the proposed modifications in relation to the previous environmental review document prepared for the Original Project. Section 15164 of the CEQA Guidelines defines an Addendum as:
(a) The lead agency or responsible agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred. (b) An addendum to an adopted negative declaration may be prepared if only minor technical changes or additions are necessary or none of the conditions described in Section 15162 calling for the preparation of a subsequent EIR or negative declaration have occurred.
(e) A brief explanation of the decision not to prepare a subsequent EIR pursuant to Section 15162 should be included in an addendum to an EIR, the lead agency's findings on the project, or elsewhere in the record.

As established in the analysis within the Addendum regarding the potential environmental effects that may be generated as compared to the Original Project, it is concluded that substantial changes are not proposed to the Original Project nor have substantial changes occurred that would require major revisions to the adopted Final EIR prepared for the Original Project. Impacts beyond those identified and analyzed in the adopted Final EIR would not be expected to occur as a result of the Modified Project. Overall, the proposed modifications to the Original Project that constitute the Modified Project would result in no new impact or mitigation information of substantial importance that would generate new, more severe impacts or require new mitigation measures compared to those identified for the Original Project in the adopted Final EIR.

Therefore, the City of Port Hueneme concludes that the analyses conducted, the conclusions reached, and the mitigation measures adopted in the Final EIR adopted on October 4, 2021, by the City of Port Hueneme, remain valid. As such, the Modified Project would not result in conditions identified in CEQA Guidelines Section 15162 requiring supplemental environmental review or a Subsequent EIR, and these are therefore not required for the Modified Project. It can be emphasized that the Modified Project would remain subject to all previously adopted mitigation measures included in the adopted Final EIR for the Original Project. The Mitigation Monitoring and Reporting Program (MMRP) adopted for the Original Project on October 4, 2021, would remain applicable to Agenda Item No. 13 Page 16 of 173 CC Agenda 12-16-2024
Neighborhood Infill Overlay (NIO) Standards
December 16, 2024

Page 17 ends

the Modified Project. Based on the above analysis, this Addendum to the previously adopted Final EIR for the project has been prepared in accordance with Section 15164 of the CEQA Guidelines.

FISCAL IMPACT:

The revised Code Amendments and rezoning will not have a direct fiscal impact on the General Fund. However, the amendments and rezoning could result in additional development potential for certain properties in the City, which could increase the value of these properties, thus also potentially increasing property tax revenues for the City.

STRATEGIC PLAN:

Primary Strategic Pillar(s) and Initiative(s):

Optimal Levels of Service for Residents and Businesses
• Promote operational excellence in all City functions and embody best practices as a municipality
• Increase communication, outreach and proactive engagement of all members of our population
ATTACHMENTS:

A. Ordinance to add Sections 10590-10594 to Chapter 4 of Article X of the Port Hueneme Municipal Code, as they relate to residential Neighborhood Infill Overlay Standards.

Exhibit A – Proposed Zoning Text Amendments
Exhibit B. Zoning Map.

B. Addendum to the Environmental Impact Report previously prepared for the Port Hueneme General Plan Update project (State Clearinghouse [SCH] # 2021040164).

Agenda Item No. 13 Page 17 of 173 CC Agenda 12-16-2024
This Page Intentionally Left Blank
Agenda Item No. 13 Page 18 of 173 CC Agenda 12-16-2024
ORDINANCE NO. _____

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PORT HUENEME, CALIFORNIA TO ADD SECTIONS 10590-10594 TO CHAPTER 4 OF ARTICLE

X OF THE PORT HUENEME MUNICIPAL CODE, AS THEY RELATE TO

RESIDENTIAL NEIGHBORHOOD INFILL OVERLAY STANDARDS, ADDING

THE NEIGHBORHOOD INFILL OVERLAY ZONING DESIGNATION TO

CERTAIN PROPERTIES, AND REPEALING THE WEST END SPECIFIC PLAN THE CITY COUNCIL DOES ORDAIN AS FOLLOWS:

A. Recognizing an on-going shortage of housing opportunities for all types of incomes, the state of California has amended or added new legislation as it relates to the production of all types of housing units for all types of household incomes.

B. In October 2021, the City Council adopted a comprehensively updated General Plan, including an updated Housing Element, which was approved by the state of California’s Department of Housing and Community Development in October 2022, and which contains policies and programs which require subsequent amendments to the City’s Municipal Code.

C. The purpose of this ordinance is to add Sections 10590-10594, to Chapter 4 of Article X of the Port Hueneme Municipal Code to facilitate the development of infill residential units, and to ensure compliance with state housing laws and the Housing Element of the City’s 2045 General Plan.

D. Further, the purpose of this ordinance is to add the Neighborhood Infill Overlay zoning designation to certain properties located in the southern portion of the City, generally south of Pleasant Valley Road, north of E. Scott Street, east of the Port of Hueneme’s boundaries and west of the Bubbling Springs Recreation Corridor, which have underlying zones of single-family (R-1), Limited Multifamily (R-2), Residential Mixed Use (R-4) and Transitional Residential/Coastal-Related Industry (R-5).

E. Further, the purpose of this ordinance is to repeal the West End Specific Plan, which was established as a code enforcement for redevelopment purposes and which has since become outdated with the dissolution of the City’s Redevelopment Agency.

SECTION 1: The City Council finds and determines as follows:

A. On December 11, 2024, a public workshop was held to inform the properties owners who would be affected by the proposed Neighborhood Infill Overlay of the project.

B. On December 16, 2024, the City Council conducted a duly noticed public hearing to consider the proposed amendments to PHMC Article X, Chapter 4, the addition of the Neighborhood Infill Overlay zoning designation to certain properties, and to repeal the West End Specific Plan as discussed herein and in the staff report dated December 16, 2024 and incorporated herein.

SECTION 2: The amendments to Chapter 4 of Article X of the Port Hueneme Municipal Code, are as set forth in attached Exhibit A and are incorporated herein.

SECTION 3: The West End Specific Plan shall be repealed in its entirety.

SECTION 4: The amendments to the City’s Zoning Map are set forth in attached Exhibit B and are incorporated herein.

Attachment A
Agenda Item No. 13 Page 19 of 173 CC Agenda 12-16-2024
Ordinance No.___, Page 2 of 11
SECTION 5: This Ordinance will take effect on the 31st day following its final adoption and passage.

SECTION 6: An Addendum was prepared to the previously certified Environmental Impact Report (EIR) (State Clearinghouse [SCH] # 2021040164) for the City of Port Hueneme’s 2021 General Plan Update EIR (Original Project), which was certified on October 4, 2021. This document has been prepared in accordance with the California Environmental Quality Act (CEQA) and Section 15164 of the CEQA Guidelines. This Addendum addresses the proposed modifications in relation to the previous environmental review document prepared for the Original Project. The City of Port Hueneme (City) was the lead agency for the certified Final EIR and is the lead agency for the environmental review in this Addendum.

SECTION 7: Repeal of any provision of the Port Hueneme Municipal Code does not affect any penalty, forfeiture, or liability incurred before, or preclude prosecution and imposition of penalties for any violation occurring before this Ordinance's effective date. Any such repealed part will remain in full force and effect for sustaining action or prosecuting violations occurring before the effective date of this Ordinance.

SECTION 8: If any section, subsection, sentence, clause, phrase, or portion of this Chapter is held to be invalid or unconstitutional by any court of competent jurisdiction for any reason, such decision shall not affect the validity of the remaining portions of this Chapter. The City Council declares that it would have adopted each section, subsection, sentence, clause, phrase, or portion of this Chapter irrespective of whether one or more sections, subsections, sentences, clauses, phrases, or portions of this Chapter be declared invalid or unconstitutional.

SECTION 9: All of the provisions of the City of Port Hueneme Municipal Code as heretofore adopted by the City Council that are in conflict with the provisions of this Ordinance are hereby repealed.

SECTION 10: The City Clerk of the City of Port Hueneme is hereby directed to certify the passage and adoption of this Ordinance and to cause it to be published as required by law.

PASSED and ADOPTED on this ___ day of 2024.

Mayor
ATTEST:
________________________________
Georgianna Nicole Alvarez
City Clerk
APPROVED AS TO FORM:
________________________________
Joan Stevens Smyth
City Attorney
Agenda Item No. 13 Page 20 of 173 CC Agenda 12-16-2024
Ordinance No.___, Page 3 of 11

EXHIBIT A
Park K. – Neighborhood Infill Overlay Zone
10590 Purpose
The purpose of the Neighborhood Infill Overlay (NIO) is to implement Housing Element programs and address housing needs within the City of Port Hueneme by encouraging the development of new housing in existing neighborhoods. The NIO implements the Housing Element programs by providing development regulations to support and provide incentives for the development of multifamily residential units on smaller lots throughout the overlay zone. 10591 - Location of Zone
The Neighborhood Infill Overlay contains requirements that apply to new residential development which increases the built residential density on the site located in the areas identified in Figure 1, below. Underlying zoning shall apply to development which involves the replacement of or additions to existing units and for new development not pursuing the NIO standards. 10592 - Development Standards
A. Front Yard.

1. Lots smaller than 10,000 gross square feet. There shall be a front yard of not less than 10 feet in depth.

2. Lots larger than 10,000 gross square feet. There shall be a front yard of not less than 15 feet in depth.

3. Porches, stoops, steps, and other architectural elements may encroach up to five (5) feet into the required setback with the provision of a minimum of one (1) street tree (15-gallon minimum size) for each 25 feet of lot width, or other enhanced architectural design or landscaping element acceptable to the approving body.

B. Side Yard.

1. On interior and standard side yards, there shall be a side yard on each side of the building of not less than four (4) feet in width.

2. On reversed corner lots, there shall be a side yard on the street side of the reversed corner lot of not less than fifty (50) percent of the front yard of the lot immediately to the rear of such reversed corner lot, and no accessory building on said reversed corner lot shall project beyond the front yard of the lot immediately to the rear of the reversed corner lot.

C. Rear Yard. There shall be a rear yard of not less than ten (10) feet in depth.

D. Lot Area. The minimum lot area shall be equal to the minimum lot area of the underlying zone.

E. Lot Width. The minimum lot width shall be equal to the minimum lot width of the underlying zone.

Agenda Item No. 13 Page 21 of 173 CC Agenda 12-16-2024
Ordinance No.___, Page 4 of 11
F. Lot Depth. The minimum lot depth shall be equal to the minimum lot depth of the underlying zone.

G. Height. The maximum building height shall be equal to the maximum building height allowed by the underlying zoning district.

H. Density.

1. Lots smaller than 10,000 gross square feet. The maximum residential density shall be 30 dwelling units per acre.

2. Lots larger than 10,000 gross square feet. The maximum residential density shall be 20 dwelling units per acre where the underlying zoning is R-1, R-2 or R-5, or 25 units per acre where the underlying zoning is R-4.

3. If the aggregate number of dwellings allowed pursuant to this density results in a fraction of a unit, the closest whole number of dwelling units above or below one-half (1/2) shall be used. If the number is precisely one-half, the number shall be rounded up.

I. Parking. Off-street parking requirements for residential uses permitted under this Chapter shall be allowed in accordance with Table 1, below.

Table 1 – Off-Street Parking Requirements in the NIO Overlay Zone Unit Type Off-street Parking Spaces Required
Studio and 1-Bedroom 1 space per unit
2 or more bedrooms 2 spaces per unit, which may be in tandem J. Open Space.

1. A minimum of three hundred (300) square feet of open space shall be provided per dwelling unit.

2. For the purposes of the NIO, common open space also includes residential amenities such as shared laundry facilities, indoor gym/recreational areas, and bicycle storage facilities.

3. Open space may be provided as private or common open space or a combination thereof. Up to fifty (50) percent of the required front yard setbacks may be counted toward the provision of open space if dedicated to private use of occupants of a single dwelling unit.

4. Common open space areas shall be a minimum of fifteen (15) feet in any dimension.

5. Private open space areas shall be a minimum of fifty (50) square feet and no smaller than four feet in any dimension.

K. Lot Consolidation. To encourage the assemblage of smaller lots into larger lots that can be developed more efficiently, incentives may be provided to a qualifying development, subject to approval by the decision-making authority.

Agenda Item No. 13 Page 22 of 173 CC Agenda 12-16-2024
Ordinance No.___, Page 5 of 11

1. Qualifying Lot Consolidation:
a. The merger of two (2) or more existing lots less than 6,000 gross square feet in area, which yields a consolidated parcel of at least sixty (60) feet in width and 100 feet in depth.
b. The merger of two (2) or more existing lots in which at least one (1) parcel is less than 6,000 gross square feet in area, which yields a consolidated parcel at least sixty (6) feet in width and 100 feet in depth.

2. Incentives. One (1) of the following incentives may be provided for developments which include a qualifying lot consolidation.
a. For consolidated lots 10,000 gross square feet or larger, an increase of maximum building height by one (1) story or ten (10) feet and an increase in the maximum number of units by 25 percent.
b. For consolidated lots less than 10,000 gross square feet:
i. An increase of the maximum building height by one (1) story or ten (10) feet; or
ii. An increase in the maximum number of units by 25 percent. 10593 - Design Standards
All development approved pursuant to this Chapter shall incorporate and provide the following design standards.

A. Building Location and Orientation.

1. Pedestrian Entrances. Primary pedestrian entrances for each residential unit (or the single primary pedestrian entrance if shared) shall face the public street, as shared pedestrian paseo, or a common courtyard.

2. Creation of Outdoor Spaces. Multiple residential buildings on a single lot shall be arranged to create outdoor spaces such as courtyards, pathways, paseos, and recreational areas, with windows facing the outdoor spaces.

B. Building Form.

1. Upper Story Massing. Where the uppermost floor(s) of a building is higher than two stories, floor area of the uppermost floor(s) shall be reduced a minimum of ten (10) percent compared to the ground floor.

2. Roofline Variation. Rooflines along elevations facing a public street shall be articulated using at least one of the following techniques.
a. A change in parapet wall or roof height of at least one (1) foot for a distance of at least 30 feet.
b. A change in roof pitch, form, or direction.

Agenda Item No. 13 Page 23 of 173 CC Agenda 12-16-2024
Ordinance No.___, Page 6 of 11
c. Inclusion of dormers, gables, parapets, chimneys, and/or varying cornices.

3. Building Plane. In no case shall a building plane visible from the public right-of-way or public open space extend for more than fifty (50) feet without a massing break of a minimum of one (1) foot in depth and four (4) feet in width.

C. Building Façade and Architectural Features.

1. Consistency with Architectural Style. Façade details shall be appropriate to, and consistent with the building’s architectural style and be carried through the entire structure and any accessory structures. Additions or alterations to an existing structure, materials, and finishes (including windows and doors) shall be consistent with the chosen architectural style of the project, or the entire structure shall be remodeled in a single architectural style.

2. Rear and Side Elevation Enhancements. Rear and side elevations that are exposed to public view shall be treated with a minimum of 75 percent of the number of architectural treatments appropriate to the chosen architectural style as the front elevations.

3. Entries. Exterior building entry and entry ways shall be protected with at least one of the following features: overhangs, recesses, porches, trellises, or other weatherprotection features covering an area at least three (30) feet in depth and four (4) feet in width.

4. Fenestration. Windows and doors facing a public street or a pedestrian-oriented space shall be trimmed, recessed or inset, grouped, and/or incorporate enhancement details such as headers/sills, shutters, trellises, awnings, or Juliet balconies consistent with the chosen architectural style of the project.

5. Color and Material Changes. Material and color changes shall occur at an inside corner, underside of a massing element, or wrapped to an appropriate termination point, such as a roof break, bay window, change in wall plane, or enhanced trim element.

6. Glare. Reflective surfaces and materials, such as mirrored glass and polished aluminum are prohibited.

7. Treatment of Accessory Structures. Accessory structures, such as, but not limited to, garages, carports, and enclosures for mechanical and service areas shall be consistent with primary structure(s) on the site. Accessory structures not visible from the street or neighboring properties may deviate from this standard; however, the accessory structure must be painted to match the primary structure.

D. Refuse and Recycling Storage.

1. A dedicated trash enclosure shall be provided for all storage and refuse collection areas which are shared by multiple dwellings on the same lot unless the proposed locations of such areas are completely screened by walls or buildings.

2. All outdoor storage and refuse collection areas shall be screened so that materials stored within these areas shall not be visible from any access street or adjacent property.

Agenda Item No. 13 Page 24 of 173 CC Agenda 12-16-2024
Ordinance No.___, Page 7 of 11

3. Refuse enclosures shall be constructed of concrete block, shall be architecturally compatible with the primary structure(s) on-site, shall include opaque, decorative opaque gates, and shall incorporate roof structures to help improve stormwater quality and to screen the enclosure from views from above. Sizing of the enclosures shall conform to the requirements of the City Public Works Department.

4. Exterior walls of outdoor storage and refuse collection areas shall be treated with antigraffiti coating and shall be surrounded with landscaping of sufficient size so that a minimum of seventy-five (75) percent of the enclosure is screened within one (1) year.

5. Refuse and recycling material containers stored within individual yards shall be screened from street view.

E. Mechanical and utility equipment. Mechanical and utility equipment (e.g., heating, cooling, antennas, air conditioners, transformers, electric and gas meters, junction boxes, or similar equipment) shall be concealed from public view with landscaping, walls, fencing or, if roof mounted, with roof wells or other architectural features, to the maximum extent feasible and as allowed by the utility service provider.

F. Parking and Access.

1. Parking and Loading Standards. With the exception of 10592(I), parking and loading areas for multi-family residential projects shall be designed in accordance with Municipal Code Section 10301.

2. Bicycle Parking. Bicycle parking shall be provided per the minimum California Green Building Standard Code requirements.

3. Treatment of Parking Areas. In order to further the objective of reducing the visual impacts of parking, driveways and garage doors, projects shall incorporate two (2) or more of the following strategies:
a. Locate parking areas and garages completely wrapped with occupiable enclosed buildings, or to the rear of the site.
b. Use of garage doors constructed of enhanced materials other than vinyl, fiberglass, or painted metal.
c. Use of single-car width garage doors.
d. Orient garage doors to the front property line.
e. Design driveways and vehicle maneuvering areas with use of pattern and such materials as integral concrete, slate, brick, pervious concrete, or areas of permeable surface.
f. Locate driveways on the side of the project lot so that the driveway is not the central feature visible form the street.
g. Use of landscaping to screen parking areas form the street.

G. Open Space and Landscaping.

Agenda Item No. 13 Page 25 of 173 CC Agenda 12-16-2024
Ordinance No.___, Page 8 of 11

1. Landscaping Standards. All project sites shall be landscaped in accordance with Port Hueneme Municipal Code Section 10302 and the City of Port Hueneme Landscape Design Guidelines.

2. Landscape Elements. To achieve a cohesive appearance of compatibility of a new project with its surroundings, proposed projects in the NIO shall include at least three(3) of the following elements in the landscape plan for the project:
a. Pedestrian-scaled lighting
b. Outdoor firepit with seating area
c. Decorative paving
d. Street tree within the front yard (15 gallon size minimum) e. Seating opportunities, such as raised planters and walls.

3. Planting Adjacent to Garage Doors. In townhouse or rowhouse type projects, a planting area of at least six square feet shall be provided adjacent to the garage doors facing alleys and motor court drives to soften the appearance of the building.

4. Fence and Wall Materials. Fences and walls shall be designed pursuant to Port Hueneme Municipal Code Section 10203(E). Fence and wall materials, colors and detailing shall match the architectural style of the building(s) on the site. Plan precision concrete block, permanent chain link fence, and razor, concertina and barbed wire are prohibited.

5. Common Open Space Enclosures. At least 50 percent of outdoor common open space, where provided, shall be open to the sky and not include patio covers, building projections, or similar enclosures that block sunlight and air.

H. Outdoor Lighting.

1. Outdoor lighting shall be installed and maintained along all vehicular access ways and common pedestrian walkways.

2. Lighting of at least one (1) foot-candle (fc) shall be installed and maintained within all covered and enclosed parking areas and shall be screened to reduce glare onto public sidewalks and adjacent properties.

3. Lighting levels shall not be increased by more than one (1) fc onto the public right-ofway and not more than 0.5 fc onto adjacent properties.

4. Lighting shall be of a scale that is appropriate for the intended use (i.e., pedestrianoriented along walkways) and light fixtures shall be architecturally compatible with the on-site structure(s). Unshielded fixtures shall be prohibited. 10594 - Development Review
The following administrative standards govern the implementation of future development applications utilizing the NIO.

Agenda Item No. 13 Page 26 of 173 CC Agenda 12-16-2024
Ordinance No.___, Page 9 of 11
A. Ministerial Review. The following project types shall be reviewed ministerially pursuant to Section 10354.

1. One-family dwellings;

2. Two-family dwellings;

3. Condominiums, apartments, or townhouses comprising six (6) units or fewer;

4. Developments qualifying for ministerial permitting in accordance with SB35 and AB 2011.

B. Administrative Permit Review. The following project types shall require an Administrative Permit in accordance with Section 10353.

1. Residential projects comprising more than six (6) units and less than 20 units and which are not more than two (2) stories in height;

2. Projects submitted and found eligible for streamlining per state law.

C. Development Permit Review. The following project types shall require a Development Permit in accordance with Section 10352.

1. Residential projects including twenty (20) or more units and/or projects three (3) or more stories, regardless of unit count.

2. Any project which deviates from the objective development and design standards contained in this Chapter.

Agenda Item No. 13 Page 27 of 173 CC Agenda 12-16-2024
Ordinance No.___, Page 10 of 11

EXHIBIT B
Agenda Item No. 13 Page 28 of 173 CC Agenda 12-16-2024
Ordinance No.___, Page 11 of 11

CERTIFICATION

STATE OF CALIFORNIA )
COUNTY OF VENTURA ) SS.

CITY OF PORT HUENEME )
I, Georgianna Nicole Alvarez, City Clerk of the City of Port Hueneme, California, do hereby certify that the foregoing Ordinance No. ____ was introduced at the regular meeting of _____, 2024, and duly adopted at the regular meeting of ________, 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Dated:

Georgianna Nicole Alvarez
City Clerk
Agenda Item No. 13 Page 29 of 173 CC Agenda 12-16-2024
This Page Intentionally Left Blank
Agenda Item No. 13 Page 30 of 173 CC Agenda 12-16-2024
Housing Element Program Implementation
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report (SCH#2021040164)
prepared by
City of Port Hueneme
Community and Economic Development Department
250 North Ventura Road
Port Hueneme, California 93041
Contact: Tony Stewart, AICP, Director of Community and Economic Development prepared with the assistance of
Rincon Consultants
180 North Ashwood Avenue
Ventura, California 93003
November 2024
Attachment B
Agenda Item No. 13 Page 31 of 173 CC Agenda 12-16-2024
Agenda Item No. 13 Page 32 of 173 CC Agenda 12-16-2024
Table of Contents
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report i Table of Contents
Acronyms and Abbreviations................................................................................................................. iii 1 Introduction....................................................................................................................................1

1.1 Background and Purpose of the EIR Addendum.................................................................1

1.2 Basis for the Addendum......................................................................................................2 2 Project Description .........................................................................................................................5 3 Impact Analysis.............................................................................................................................13

3.1 Aesthetics..........................................................................................................................15

3.2 Agriculture and Forestry Resources..................................................................................19

3.3 Air Quality .........................................................................................................................21

3.4 Biological Resources..........................................................................................................25

3.5 Cultural Resources............................................................................................................29

3.6 Energy ...............................................................................................................................31

3.7 Geology and Soils..............................................................................................................33

3.8 Greenhouse Gas Emissions...............................................................................................37

3.9 Hazards and Hazardous Materials ....................................................................................41

3.10 Hydrology and Water Quality ...........................................................................................45

3.11 Land Use and Planning......................................................................................................49

3.12 Mineral Resources ............................................................................................................51

3.13 Noise .................................................................................................................................53

3.14 Population and Housing....................................................................................................55

3.15 Public Service ....................................................................................................................57

3.16 Recreation.........................................................................................................................59

3.17 Transportation ..................................................................................................................61

3.18 Tribal Cultural Resources..................................................................................................65

3.19 Utilities and Service Systems ............................................................................................67

3.20 Wildfire..............................................................................................................................71

3.21 Mandatory Findings of Significance..................................................................................73 4 Conclusion.....................................................................................................................................75 5 References and Preparers.............................................................................................................77 References....................................................................................................................................77 List of Preparers............................................................................................................................77 Agenda Item No. 13 Page 33 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
ii
Tables
Table 1 NIO Residential Units..........................................................................................................6 Table 2 R-4 Residential Units...........................................................................................................6 Table 3 Re-Zone Sites.......................................................................................................................7 Table 4 Existing and Future Operational Emissions Within R-4 Zone and NIO .............................23 Table 5 Combined Annual GHG Emissions Within R-4 Zone and NIO ...........................................38 Figures
Figure 1 Regional Location................................................................................................................8 Figure 2 City Limit .............................................................................................................................9 Figure 3 Neighborhood Infill Overlay..............................................................................................10 Figure 4 Proposed R-4 Zone Density Increase ................................................................................11 Figure 5 Proposed Zoning Map in Port Hueneme...........................................................................12 Appendices
Appendix A CalEEMod Calculations
Agenda Item No. 13 Page 34 of 173 CC Agenda 12-16-2024
Acronyms and Abbreviations
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report iii Acronyms and Abbreviations
AFY Acre Feet Per Year
APN Assessor’s Parcel Number
AQAP Air Quality Attainment Plan
BMPs Best Management Practices
Caltrans California Department of Transportation
CEQA California Environmental Quality Act
CO2e carbon dioxide equivalent
CSPD Cal State Police Department
CSU California State University
CSUB California State University, Bakersfield
EIR Environmental Impact Report
FTA Federal Transit Authority
GHG Greenhouse Gas
ITP Incidental Take Permit
LOS Level of Service
MLD Most Likely Descendant
NAHC Native American Heritage Commission
NPDES National Pollutant Discharge Elimination System
PM10 Particulate Matter less than 10 microns in diameter SUSMP Standard Urban Stormwater Mitigation Plan
MMRP Mitigation Monitoring and Reporting Program
SCH State Clearinghouse
SWPPP Stormwater Pollution Prevention Plan
USFWS United States Fish and Wildlife Service
UWMP Urban Water Management Plan
VdB Vibration decibels
VMT Vehicle Miles Traveled
Agenda Item No. 13 Page 35 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
iv
This page intentionally left blank.

Agenda Item No. 13 Page 36 of 173 CC Agenda 12-16-2024
Introduction
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 1 1 Introduction
This Addendum was prepared in accordance with the California Environmental Quality Act (CEQA) and the CEQA Guidelines. This document has been prepared to serve as an Addendum to the previously certified Environmental Impact Report (EIR) (State Clearinghouse [SCH] # 2021040164) for the City of Port Hueneme’s 2021 General Plan Update EIR (Original Project). The City of Port Hueneme (City) was the lead agency for the certified Final EIR and is the lead agency for the environmental review in this Addendum.

This Addendum addresses the proposed modifications in relation to the previous environmental review document prepared for the Original Project. Section 15164 of the CEQA Guidelines defines an Addendum as:
(a) The lead agency or responsible agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred. (b) An addendum to an adopted negative declaration may be prepared if only minor technical changes or additions are necessary or none of the conditions described in Section 15162 calling for the preparation of a subsequent EIR or negative declaration have occurred. (e) A brief explanation of the decision not to prepare a subsequent EIR pursuant to Section 15162 should be included in an addendum to an EIR, the lead agency's findings on the project, or elsewhere in the record.

1.1 Background and Purpose of the EIR Addendum
The Final EIR for the Original Project (SCH #2021040164) was certified on October 4, 2021, by the City of Port Hueneme. The certified Final EIR consists of responses to public and agency comments received on the Draft EIR and the text of the Draft EIR. Information and technical analyses from the certified Final EIR are utilized or referenced throughout this Addendum. Relevant passages from the certified Final EIR are cited and available for review at the City of Port Hueneme’s website at https://www.ci.port-hueneme.ca.us/1272/2045-General-Plan. In conjunction with certification of the Final EIR, the City of Port Hueneme also adopted the Statement of Overriding Considerations and approved the Original Project.

As approved, the Original Project would involve an update of the City of Port Hueneme General Plan and Local Coastal Plan to maintain consistency with the City of Port Hueneme General Plan changes to land use designations and to address the City of Port Hueneme’s vulnerability to sea-level rise related hazards. The Original Project would increase residential and mixed-use land use designations in the City to replace aging commercial centers with mixed use centers that include enhanced shopping and dining opportunities and responding to the need to provide housing units to meet the City’s required Regional Housing Needs Allocation (RHNA).

Plan Area
The Plan Area (Port Hueneme) is a coastal city located in Ventura County just south of the City of Oxnard and east of Channel Islands Harbor. The Port of Hueneme and the United States (U.S.) Naval Base Ventura County (NBVC) are in the city, and Naval Air Station Point Mugu is located about five miles to the south. Port Hueneme is primarily built out and has a total land area of 4.5 square miles.

Agenda Item No. 13 Page 37 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
2 Addendum
The project applicant now proposes modifications to the Original Project, herein referred to the “Modified Project.” This document is an Addendum to the previously certified Final EIR and has been prepared by the City to evaluate the potential environmental impacts of the proposed Modified Project. This Addendum has been prepared in accordance with the relevant provisions of CEQA and Section 15164 of the CEQA Guidelines. A detailed description of the Modified Project is provided in Section 2, Project Description, of this Addendum.

1.2 Basis for the Addendum
When an EIR has been certified and a project is modified or otherwise changed after adoption, additional CEQA review may be necessary. The key considerations in determining the need for the appropriate type of additional CEQA review are outlined in Section 21166 of the Public Resources Code (PRC) and Sections 15162, 15163 and 15164 of the CEQA Guidelines.

Section 15162(a) of the CEQA Guidelines provides that a Subsequent EIR is not required unless the following occurs:
(1) Substantial changes are proposed in the project which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; (2) Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or Negative Declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or (3) New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the Negative Declaration was adopted, shows any of the following:
(A) The project will have one or more significant effects not discussed in the previous EIR or negative declaration;
(B) Significant effects previously examined will be substantially more severe than shown in the previous EIR;
(C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or (D) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.

Pursuant to Section 15164(a) of the CEQA Guidelines, an Addendum to a certified EIR may be prepared by the Lead Agency that prepared the original EIR if only minor technical changes or additions are necessary or none of the conditions described in Section 15162 have occurred that require preparation of a Subsequent EIR or negative declaration. An Addendum must include a brief explanation of the agency’s decision not to prepare a Subsequent EIR and be supported by substantial evidence in the record as a whole (Section 15164[e]). The Addendum to a certified EIR need not be circulated for public review but it may be included in or attached to the adopted Agenda Item No. 13 Page 38 of 173 CC Agenda 12-16-2024
Introduction
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 3 negative declaration (Section 15164[c]). The decision-making body must consider the Addendum prior to making a decision on the project (Section 15164[d]).

The proposed Modified Project would not result in new or more severe impacts related to: 1) substantial changes to the Original Project which requires major revisions to the certified Final EIR; 2) substantial changes to the circumstances under which the Original Project are being undertaken which will require major revisions to the certified Final EIR; or 3) new information of substantial importance showing significant effects not previously examined. Therefore, an Addendum to the certified EIR for the Original Project is appropriate to address the proposed Modified Project because the proposed modifications to the approved Original Project do not meet the conditions of Section 15162(a) for preparation of a Subsequent EIR or negative declaration.

The certified Final EIR and this Addendum to the certified Final EIR serve as informational documents to inform decision-makers and the public of the potential environmental consequences of approving the proposed Modified Project. This Addendum neither controls nor determines the ultimate decision for approval of the proposed Modified Project, described herein in Section 2, Project Description. The information presented in this Addendum to the certified Final EIR will be considered by the City of Port Hueneme alongside the certified Final EIR prior to making a decision on the Modified Project.

Agenda Item No. 13 Page 39 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
4 This page intentionally left blank.

Agenda Item No. 13 Page 40 of 173 CC Agenda 12-16-2024
Project Description
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 5 2 Project Description
The Modified Project would be located on the same Plan Area as described and analyzed in the certified Final EIR for the Original Project. As described in the EIR, the project site (“Plan Area”) is approximately 4.5 square miles and is in Ventura County just south of the City of Oxnard and east of Channel Islands Harbor. Figure 1 illustrates the location of the site within the region and Figure 2 shows the city limits, which encompasses the study area for this EIR Addendum.

As described in Section 1, Introduction, the Modified Project consists of modifications to the Original Project analyzed in the certified EIR. This document was approved by the City of Port Hueneme on October 4, 2021. The Modified Project contains four components: 1) a new Neighborhood Infill Overlay (NIO) to implement Housing Element Program 8 and address housing needs within the City of Port Hueneme; 2) an increase in maximum density to the City’s Mixed Use Residential Zone (R-4); 3) a rezone of five sites to be consistent with the 2021 GPU; and 4) minor text amendments to the City’s Zoning Ordinance. The Neighborhood Infill Overlay is shown in Figure 3, the R-4 zone map is shown in Figure 4 and the proposed zoning map is shown in Figure 5.

Neighborhood Infill Overlay
The NIO implements Housing Element Program 8 (Small Lot Consolidation and Missing Middle Housing) by providing updated development regulations within the NIO to support and provide incentives for the development of missing middle-type residential units on smaller lots throughout the overlay zone, which is shown in Figure 3. The NIO increases the built residential density on the site located in the areas identified in Figure 3. Table 1 compares the potential maximum number of residential units calculated for the existing conditions (without NIO) and proposed NIO conditions, which results in a net increase of 723 units. Underlying zoning shall apply to development which involves the replacement of or additions to existing units. Below highlight some of the development standards of the NIO:
▪ Front Yard.
 Lots smaller than ten thousand (10,000) square feet. There shall be a front yard of not less than ten (10) feet in depth.
 Lots larger than ten thousand (10,000) square feet. There shall be a front yard of not less than fifteen (15) feet in depth.
 Porches, stoops, steps, and other architectural elements may encroach up to five (5) feet into the required setback. Developments with encroaching elements are required to provide one (1) street tree (15-gallon minimum size) within the front yard for each twenty-five (25) feet of lot width.
▪ Side Yard. On interior lots there shall be a side yard on each side of the building of not less than four (4) feet. On corner lots the side yard regulations shall be the same as for interior lots except in the case of a reversed corner lot. In the case of a reversed corner lot, there shall be a side yard on the street side of the reversed corner lot of not less than fifty (50) percent of the front yard of the lot immediately to the rear of such reversed corner lot, and no accessory building on said reversed corner lot shall project beyond the front yard line of the lot immediately to the rear of the reversed corner lot.
▪ Rear Yard. There shall be a rear yard of not less than ten (10) feet.

Agenda Item No. 13 Page 41 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
6 ▪ Lot Area. Minimum lot area shall be equal to the minimum lot area of the underlying zone. ▪ Lot Width. Minimum lot width shall be equal to the minimum lot width of the underlying zone. ▪ Lot Depth. Minimum lot depth shall be equal to the minimum lot depth of the underlying zone. ▪ Density.
 Lots smaller than ten thousand (10,000) square feet. The maximum residential density shall be thirty (30) dwelling units per acre.
 Lots larger than ten thousand (10,000) square feet. The maximum residential density shall be twenty (20) dwelling units per acre where the underlying zoning is R-1, R-2 or R-5, or up to thirty (30) dwelling units per acre where the underlying zoning is R-4.  If the aggregate number of dwellings allowed pursuant to this density results in a fraction of a unit, the closest whole number of dwelling units above or below one-half (½) shall be used. If the number is at precisely on-half, the number shall be rounded up. ▪ Off-street Parking. Parking requirements for residential uses permitted under this chapter shall be allowed in accordance with the following:
 Studio: 1 space per dwelling unit (du)
 1 bedroom: 1 space per du
 2 or more bedrooms: 2 spaces per du
Table 1 NIO Residential Units
Zone Acreage/Count Density Units
Existing Condition
R-1 (within NIO) 119 parcels 1 unit per parcel 119
R-2 (within NIO) 25.74 ac 15 du/ac 386.1
R-5 (within NIO) 6.5 ac 15 du/ac 97.5
Total 602.6
Proposed Conditions
NIO (sites >10k sf) 18.86 ac 20 du/ac 377.2
NIO (sites <10k sf) 31.6 ac 30 du/ac 948
Total 1,325.2
Total Net Increase 722.6
Mixed-Use Residential Update
The Modified Project also involves a density increase in the R-4 zone from 25 dwelling units per acre (du/ac) to up to 30 du/ac with incentives, which implements Housing Program 15 (Mixed-Use Incentives). The density increase in the R-4 zone would result in a net increase of 150 R-4 units (refer to Table 2 and Figure 4; approximately 4.4 acres of R-4 property is located in the NIO area).

Table 2 R-4 Residential Units
R-4 Citywide Acreage/Count (ac) Density (du/ac) Units
Existing Conditions 30.06 25 751.5
Proposed Conditions 30.06 30 901.8
Total Net Increase 150.3
Agenda Item No. 13 Page 42 of 173 CC Agenda 12-16-2024
Project Description
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 7 Re-Zone Sites A through E
The Modified Project includes a rezone of the five sites (A through E) proposed in the 2021 GPU EIR to be consistent with the land use designations of those sites in the 2021 GPU. These five sites are proposed to change from Commercial (C-1), Single-Family (R-1), Limited Multifamily (R-2), or and Park Reserve (P-R) to either Multiple Family (R-3), Mixed-Use Residential (R-4), or Port Related Use (M-PR). Proposed land use designation changes were made with the primary goals of replacing aging commercial centers with mixed use centers that include enhanced shopping opportunities and dining opportunities and responding to the need for affordable and entry-level housing. Table 3 shows the information regarding the five sites shown in Figure 5 that are proposed for rezoning.

Table 3 Re-Zone Sites
Site ID Acreage Site Address Current Zoning Designation Proposed Zoning Designations A 4.5 Victoria Avenue Mixed Use (R-4), Planned
Development Overlay (PD)
R-3
B 5.5 Patterson Road and Channel
Islands Boulevard
Commercial (C-1) R-4
C 8.0 Ventura Road and Channel
Islands Boulevard
Commercial (C-1) R-4
D 3.8 645, 671, 683, 701, 711 E. Port
Hueneme Road
Limited Multifamily (R-2) R-3
E 11.4 100 Pomona Street/Market and
Pomona
Commercial (C-1)
& Park Reserve (P-R)
M-PR and R-4
Technical Zoning Code Updates
Lastly, the Modified Project includes the following minor Zoning Ordinance updates to ensure consistency with the 2021-2029 Housing Element of the 2021 GPU. ▪ Program 9: Inclusionary Housing – update Section 10804 of the City’s Municipal Code to increase the inclusionary housing program to include the entire City. ▪ Program 13: Density Bonus – update the Density Bonus Ordinance (Article X, Chapter 6, Section 10803 of the City’s Municipal Code) to ensure consistency with State law. ▪ Program 14: Housing Replacement – amend the Zoning Ordinance to require the replacement of existing residential units on nonvacant RHNA sites as a condition of project approval for development per Assembly Bill (AB) 1397.

Agenda Item No. 13 Page 43 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
8 Figure 1 Regional Location
Agenda Item No. 13 Page 44 of 173 CC Agenda 12-16-2024
Project Description
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 9 Figure 2 City Limit
Agenda Item No. 13 Page 45 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
10 Figure 3 Neighborhood Infill Overlay
Agenda Item No. 13 Page 46 of 173 CC Agenda 12-16-2024
Project Description
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 11 Figure 4 Proposed R-4 Zone Density Increase
Agenda Item No. 13 Page 47 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
12 Figure 5 Proposed Zoning Map in Port Hueneme
Agenda Item No. 13 Page 48 of 173 CC Agenda 12-16-2024
Impact Analysis
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 13 3 Impact Analysis
A comparative analysis of the potential impacts associated with the proposed Modified Project and those of the approved Original Project analyzed in the certified Final EIR has been prepared using the CEQA checklist as a guide. This checklist is consistent with the format and environmental topics and questions of the checklist used in the Final EIR, but also includes recent updates to reflect the most recently adopted checklist provided in Appendix G of the CEQA Guidelines. The checklist considers the full range of environmental issues subject to analysis under CEQA (in rows), and then poses a series of questions (in columns) aimed at identifying the degree to which the issue was analyzed in the Final EIR. The checklist also includes a column identifying whether the proposed Modified Project constitutes new information of substantial importance relative to each environmental issue. The questions posed in each column are described below.

Where was impact analyzed?
This column provides a cross-reference to the portions of the certified Final EIR where information and analyses may be found relative to the environmental issue listed under each topic. The crossreferences identified in this column correspond with page numbers and section numbers of the certified Final EIR.

Do proposed changes require major revisions to the certified Final EIR? In accordance with Section 15162(a)(1) of the CEQA Guidelines, this column indicates whether the proposed Modified Project would involve new significant environmental impacts or a substantial increase in the severity of previously identified significant impacts that, in turn, would require major revisions of the certified Final EIR.

Do new circumstances require major revisions to the certified Final EIR? In accordance with Section 15162(a)(2) of the CEQA Guidelines, this column indicates whether changes to the circumstances under which the Modified Project is undertaken or implemented have occurred that would involve new significant environmental impacts or a substantial increase in the severity of previously identified significant impacts that, in turn, would require major revisions of the certified Final EIR.

Is there any new information resulting in new or substantially more severe significant impacts? In accordance with Sections 15162(a)(3)(A) and 15162(a)(3)(B) of the CEQA Guidelines, this column indicates whether new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the Final EIR was certified, shows additional or substantially more severe significant impacts not discussed in the certified Final EIR.

Do mitigation measures included in the certified Final EIR address and/or resolve impacts? In accordance with Sections 15162(a)(3)(C) and 15162(a)(3)(D) of the CEQA Guidelines, this column indicates whether new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the Final EIR was certified, shows that mitigation measures or alternatives in the certified Final EIR would now be feasible, or identifies new mitigation measures or alternatives not in the certified Final EIR that would reduce significant impacts, but which the applicant declines to adopt.

Agenda Item No. 13 Page 49 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
14 This page intentionally left blank.

Agenda Item No. 13 Page 50 of 173 CC Agenda 12-16-2024
Impact Analysis
Aesthetics
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 15

3.1 Aesthetics
Where was
Impact
Analyzed in
the EIR?
Do Proposed
Changes
Require Major
Revisions to
the EIR?
Do New
Circumstances
Require Major
Revisions to
the EIR?
Any New
Information
Resulting in
New or
Substantially
More Severe
Significant
Impacts?
Do EIR
Mitigation
Measures
Address
and/or
Resolve
Impacts?
Would the project:
a. Have a substantial adverse
effect on a scenic vista?
Pages 4.1-12
and 4.1-13
No No No N/A
b. Substantially damage scenic
resources, including but not
limited to, trees, rock
outcroppings, and historic
buildings within a state scenic
highway?

Page 4 ends

c. In non-urbanized areas,
substantially degrade the
existing visual character or
quality of public views of the
site and its surroundings?
(Public views are those that
are experienced from a
publicly accessible vantage
point). If the project is in an
urbanized area, would the
project conflict with
applicable zoning and other
regulations governing scenic
quality?
Pages

4.1-14
through

4.1-16
No No No N/A
d. Create a new source of
substantial light or glare that
would adversely affect
daytime or nighttime views in
the area?
Pages

4.1-16 and

4.1-17
No No No N/A
a. Would the project have a substantial adverse effect on a scenic vista? As identified in the adopted Final EIR, the primary scenic vista in Port Hueneme occurs at the shoreline, particularly from Surfside Drive and Hueneme Beach Park. Sites designed for potential redevelopment under the Original Project are outside the viewshed of Surfside Drive and would not impact scenic vistas. The Final EIR determined that with implementation of General Plan Policies LU 6-2 and LU 6-3, impacts related to scenic vistas throughout the Plan Area would be less than significant. The Modified Project would be located on the same Plan Area as the Original Project and would be required to comply with General Plan Policies LU 6-2 and LU 6-3. Therefore, scenic vista impacts under the Modified Project would be identical to scenic vista impacts under the Original Agenda Item No. 13 Page 51 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
16 Project, which are less than significant. As such, the Modified Project would result in no new or more severe impacts to scenic vistas beyond those identified in the previously adopted Final EIR. b. Would the project substantially damage scenic resources, including but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?

Page 4 ends

designation as a State Scenic Highway. The Final EIR determined that any designated or eligible for designation highways do not occur in or near Port Hueneme and all are too distant to be affected by the Original Project, resulting in no impact related to State scenic highways. The Modified Project would be located on the same Plan Area as the Original Plan; therefore, no impacts to State Scenic Highways would occur under the Modified Project. California State Route (SR) 1 was not identified in the Final EIR, but it lies 2.5 miles east of the Plan Area and is eligible for designation as a State scenic highway (California Department of Transportation [Caltrans] 2019). SR 1 would not be impacted by the implementation of the Original Project or Modified Project due to distance and existing intervening development. In addition, the Modified Project would be required to comply with all local policies and regulations protecting visual and scenic resources, including trees, rock outcroppings, and historic buildings. As such, the Modified Project would result in no new or more severe impacts to State scenic highways beyond those identified in the previously adopted Final EIR. c. Would the project, in non-urbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from a publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality?
Port Hueneme is a largely built out and urbanized community in southern Ventura County. The adopted Final EIR determined that the Original Project would generally improve the visual quality of the Plan Area, with implementation of General Plan Policies LU 6-2, LU 6-3, COS 4-6, COS 8-3, and ED 1-1, and impacts would be less than significant. As discussed in Section 2, Project Description, the Modified Project includes a new NIO, an increase in maximum density to the City’s R-4 zone, a rezone of five sites to be consistent with the City’s General Plan, and minor text amendments to the City’s Zoning Ordinance. Future development under the Modified Project would occur in already developed, urbanized areas in the same manner as those analyzed in the approved Final EIR and thus would not adversely affect the existing aesthetic quality within the City. Similar to the Original Project, development under the Modified Project would be required to comply with relevant regulations and policies from the General Plan and standards from the Port Hueneme Municipal Code (PHMC), including allowed development standards and building height and size. Compliance with these regulations and policies would ensure that the Modified Project would not substantially degrade the existing visual character of the City or conflict with applicable zoning. Therefore, the Modified Project would result in no new or more severe impacts to visual character and quality beyond those identified in the previously adopted Final EIR.

Agenda Item No. 13 Page 52 of 173 CC Agenda 12-16-2024
Impact Analysis
Aesthetics
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 17 d. Would the project create a new source of substantial light or glare that would adversely affect daytime or nighttime views in the area?
As discussed in the adopted Final EIR, reasonably foreseeable development facilitated under the Original Project would increase the development intensity throughout Port Hueneme, and potentially introduce new sources of light and glare at a limited number of sites. However, development would occur in already urbanized areas of the Plan Area and would be required to comply with existing regulations including the California Green Building Code and the Landscape Design Guidelines. Therefore, the Original Project was determined to have a less-than-significant impact on light and glare. Similar to the Original Project, the Modified Project would potentially introduce new sources of light and glare to the Plan Area but would be required to comply with all existing regulations to reduce its impact to a less-than-significant level. Therefore, the Modified Project would result in no new or more severe impacts to light and glare beyond those identified in the previously adopted Final EIR.

Agenda Item No. 13 Page 53 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
18 This page intentionally left blank.

Agenda Item No. 13 Page 54 of 173 CC Agenda 12-16-2024
Impact Analysis
Agriculture and Forestry Resources
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 19

3.2 Agriculture and Forestry Resources
Where was
Impact
Analyzed in
the EIR?
Do Proposed
Changes
Require
Major
Revisions to
the EIR?
Do New
Circumstances
Require Major
Revisions to
the EIR?
Any New
Information
Resulting in
New or
Substantially
More Severe
Significant
Impacts?
Do EIR
Mitigation
Measures
Address
and/or
Resolve
Impacts?
Would the project:
a. Convert Prime Farmland,
Unique Farmland, or
Farmland of Statewide
Importance (Farmland), as
shown on maps prepared
pursuant to the Farmland
Mapping and Monitoring
Program of the California
Resources Agency, to nonagricultural use?

Page 4 ends

b. Conflict with existing zoning
for agricultural use or a
Williamson Act contract?

Page 4 ends

c. Conflict with existing zoning
for, or cause rezoning of,
forest land (as defined in
Public Resources Code
Section 12220(g));
timberland (as defined by
Public Resources Code
Section 4526); or timberland
zoned Timberland Production
(as defined by Government
Code Section 51104(g))?

Page 4 ends

d. Result in the loss of forest
land or conversion of forest
land to non-forest use?

Page 4 ends

e. Involve other changes in the
existing environment which,
due to their location or
nature, could result in
conversion of Farmland to
non-agricultural use or
conversion of forest land to
non-forest use?

Page 4 ends

Agenda Item No. 13 Page 55 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
20 a. Would the project convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? b. Would the project conflict with existing zoning for agricultural use or a Williamson Act contract?
c. Would the project conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)); timberland (as defined by Public Resources Code Section 4526); or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))?
d. Would the project result in the loss of forest land or conversion of forest land to non-forest use? e. Would the project involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland to non-agricultural use or conversion of forest land to non-forest use?
The Modified Project would occur within the same Plan Area as the Original Project. As described in the adopted Final EIR, there are no areas of Prime Farmland, Unique Farmland, Farmland of Statewide Importance, or Williamson Act lands within the Plan Area. As the Plan Area does not constitute forest land and is not zoned for forest land or timber land production, the Modified Project would not conflict with existing zoning for, or cause rezoning of, forest land, timberland, or timberland zoned Timberland Production, nor would it result in the loss of forest land or conversion of forest land to non-forest use. Therefore, the Modified Project would also have no impact on Farmland or agricultural uses or forest land, consistent with the Original Project. Accordingly, the Modified Project would result in no new or more severe impacts to agriculture and forestry resources beyond those identified in the previously adopted Final EIR.

Agenda Item No. 13 Page 56 of 173 CC Agenda 12-16-2024
Impact Analysis
Air Quality
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 21

3.3 Air Quality
Where was
Impact
Analyzed in
the EIR?
Do Proposed
Changes
Require
Major
Revisions to
the EIR?
Do New
Circumstances
Require Major
Revisions to
the EIR?
Any New
Information
Resulting in
New or
Substantially
More Severe
Significant
Impacts?
Do EIR
Mitigation
Measures
Address
and/or
Resolve
Impacts?
Would the project:
a. Conflict with or obstruct
implementation of the
applicable air quality plan?
Pages

4.2-13
through

4.2-16
No No No N/A
b. Result in a cumulatively
considerable net increase of
any criteria pollutant for
which the project region is
non-attainment under an
applicable federal or state
ambient air quality standard?
Pages

4.2-17
through

4.2-20
No No No N/A
c. Expose sensitive receptors to
substantial pollutant
concentrations?
Pages

4.2-20 and

4.2-21
No No No N/A
d. Result in other emissions
(such as those leading to
odors) adversely affecting a
substantial number of
people?

Page 4 ends

a. Would the project conflict with or obstruct implementation of the applicable air quality plan? The thresholds of significance used to evaluate the significance of air pollutants under the Modified Project are consistent with those utilized in the adopted Final EIR, specifically, consistency with the growth projections contained in the Ventura County Air Quality Management Plan (AQMP). The Original Project’s impact analysis was based on the 2016 version of the AQMP and the Modified Project’s impact analysis is based on the most recent version (2022) of the AQMP. The 2022 Ventura County AQMP relies on the Southern California Association of Governments’ (SCAG) 2020 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), titled Connect SoCal, forecasts of regional population growth in its AQMP population projections.

As discussed beginning on page 4.2-13 of the adopted Final EIR, reasonably foreseeable development under the Original Project could add an estimated 1,467 new residents and approximately 773 new jobs to the City through 2045; this growth would exceed the 2016 and 2020 SCAG RTP/SCS growth projections. Since development facilitated by the Original Project would exceed the growth forecasts upon which the AQMP is based, the Original Project would be inconsistent with the AQMP. However, the Original Project would increase the intensity of land use within the City and prioritize mixed use development and would implement GPU policies which are intended to reduce air pollutant emissions. Therefore, although the Original Project would Agenda Item No. 13 Page 57 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
22 accommodate development exceeding the 2016 AQMP projections, it would not conflict with the intent of the 2016 AQMP or impede efforts to meet the ozone standards.

Similar to the Original Project, reasonably foreseeable development under the Modified Project would add an estimated 2,436 residents to the City through 2045 which would exceed the 2020 SCAG RTP/SCS growth projections. With the implementation of GPU policies listed in the adopted Final EIR, the Modified Project would not conflict with the intent of the 2022 AQMP or impede efforts to meet federal and State ozone standards. As with the Original Project, the Modified Project would be required to adhere to all applicable standards of the AQMP and would result in no new or more severe impacts related to conflicts with applicable air quality plans beyond those identified in the previously adopted Final EIR.
b. Would the project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard?
As described on page 4.2-17 of the adopted Final EIR, construction activity due to reasonably foreseeable development facilitated by the Original Project may involve activities that result in air pollutant emissions. The extent of daily emissions, generated by construction equipment, would depend on the quantity of equipment used, the hours of operation for each project, the amount of soil disturbed, length of disturbance time, whether existing structures are demolished, the amount of excavation, and the quantity of excavated soils transported off-site. Depending upon the type, size, and timeframe of development, maximum daily construction emissions associated with individual projects could potentially exceed Ventura County Air Pollution Control District (VCAPCD) significance thresholds of 25 pounds per day for ROC and NOx, and thus require VCAPCD recommended mitigation. However, future construction activity in the City associated with the Original Project or Modified Project would be subject to GPU Policy AQ 2-8 which would reduce the overall level of air quality impacts related to construction during the Original Project and Modified Project time frame. Additionally, both the Original Project and Modified Project would adhere to VCAPCD Rules 50, 51, 55, 55.1, 62.7, and 74.2, which are intended to reduce emissions of airborne pollutants during typical construction activities. Therefore, similar to the Original Project, the Modified Project would adhere to GPU Policy AQ 2-8 and applicable VCAPCD rules which would reduce construction impacts to a less-than-significant level. Impacts related to criteria pollutant emissions from project construction would therefore be less than significant, and the Modified Project would result in no new or more severe impacts related to criteria pollutant emissions from construction beyond those identified in the previously adopted Final EIR for the Original Project.

As described on pages 4.2-18 through 4.2-20 of the adopted Final EIR, operation of reasonably foreseeable development facilitated by the Original Project may involve activities that result in air pollutant emissions. The extent of daily emissions, particularly ROC and NOX emissions, generated by operation, would depend on the quantity of new vehicle trips for each reasonably foreseeable project under the Plan Area.

Operational GHG emissions associated with existing uses within the R-4 zone and NIO under the Original Project and future uses within the R-4 zone and NIO under the Modified Project were estimated using CalEEMod version 2022.1. Table 4 shows the maximum annual operational emissions associated with the buildout of both the existing uses within the R-4 zone and NIO under the Original Project and future uses within the R-4 zone and NIO under the Modified Project, which account for the net increase of 873 residential units from the Modified Project. The emissions Agenda Item No. 13 Page 58 of 173 CC Agenda 12-16-2024
Impact Analysis
Air Quality
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 23 estimates are provided for informational purposes only because both the Original Project and Modified Project would not propose any specific development projects.

Table 4 Existing and Future Operational Emissions Within R-4 Zone and NIO Pollutant
Existing Maximum Annual Emissions
(pounds per day)
Future Maximum Annual Emissions
(pounds per day)
ROC 48.4 79.7
NOX 13.8 22.8
CO 137 226
SO2 0.31 0.51
PM10 34.0 55.8
PM2.5 8.97 14.7
See Appendix A for CalEEMod Annual worksheet.

Depending upon the land use type, size of development, and location, maximum daily operational emissions associated with individual projects could potentially exceed VCAPCD significance thresholds of 25 pounds per day for ROC and NOx, and thus require VCAPCD recommended mitigation. However, future construction activity in the City associated with the Original Project or Modified Project would be subject to GPU Policies AQ 1-1, AQ 1-3, AQ 1-5, AQ 2-1, and AQ 2-9 which would reduce the total number of vehicle trips as well as the exposure of sensitive developments to air pollutants. Additionally, reasonably foreseeable development associated with either the Original Project or the Modified Project would be required to comply with VCAPCD’s Implementation Action AQ-4 which would require air quality analysis to be prepared on a projectlevel to demonstrate that project operational emissions have been reduced to a less-than-significant level. Adherence to the GPU Policies listed and Implementation Action AQ-4 would reduce both the Original Project’s and the Modified Project’s impacts to a less-than-significant level. Impacts related to criteria pollutant emissions from project operation would therefore be less than significant, and the Modified Project would result in no new or more severe impacts related to operational criteria pollutant emissions beyond those identified in the previously adopted Final EIR for the Original Project.
c. Would the project expose sensitive receptors to substantial pollutant concentrations? As discussed on page 4.2-20 of the adopted Final EIR, the following analysis discusses pollutant concentrations associated with CO hotspots, toxic air contaminants (TACs), and San Joaquin Valley Fever. CO hotspots are associated with increased traffic, TACs are associated with stationary sources, and valley fever is associated with construction activities.

CO Hotspots
The adopted Final EIR determined the Original Project would not result in the operation of intersections at an LOS of E or F. Therefore, a more detailed CO hotspot analysis was not required at the time of the adopted Final EIR, as reasonably foreseeable development under the Original Project would not create a new CO hotspot or worsen conditions at an existing CO hotspot. As determined in Section 3.17, Transportation, of this Addendum, the Modified Project would not introduce new or more significant impacts related to vehicle miles traveled. Therefore, reasonably foreseeable Agenda Item No. 13 Page 59 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
24 development under the Modified Project would not create a new CO hotspot or worsen conditions at an existing CO hotspot. Impacts would be less than significant.

Toxic Air Contaminants (TACs)
The adopted Final EIR determined that the majority of the proposed land use changes under the Original Project would not include substantial sources of TAC emissions. The land uses associated with the Original Project that are common sources of TACs are fuel storage facilities. However, the Original Project would comply with VCAPCD rule 71.2 which includes specific requirements for this land use to prevent and detect leaks. The Modified Project does not include any land use changes which are considered common sources of TACs.

Reasonably foreseeable development under the Original Project and the Modified Project could result in the renovation or demolition of buildings and structures that contain asbestos. Compliance with VCAPCD Rule 62.7 would ensure that any ACMs would be safely removed and disposed of prior to demolition or construction activities, and construction of reasonably foreseeable development would not result in exposure to ACMs. Therefore, construction and operation of reasonably foreseeable development under the Original Project and the Modified Project would have a lessthan-significant impact related to TACs and would not expose sensitive receptors to substantial pollutant concentrations.

San Joaquin Valley Fever
The adopted Final EIR determined construction activities resulting from reasonably foreseeable development under the Original Project, including site preparation and grading, would have the potential to release Coccidioides immitis spores, which causes Valley Fever.

The Original Project and Modified Project would occur in the same Plan Area. The City is an urbanized area that is fully developed, with little undisturbed, native soil. Due to the previous soil disturbance across the City, disturbance of soils during construction activities is unlikely to pose a substantial risk of infection. In addition, substantial increases in the number of reported cases of Valley Fever tend to occur only after major ground-disturbing events such as the 1994 Northridge earthquake. Construction of reasonably foreseeable development under the Original Project and Modified Project would comply with VCAPCD Rule 55 (Fugitive Dust) to limit dust generation and movement. Therefore, construction of reasonably foreseeable development under the Original Project and the Modified Project would not result in a substantial increase in entrained fungal spores that cause Valley Fever above existing background levels and impacts related to Valley Fever would be less than significant. Therefore, the Modified Project would not result in new or more severe impacts related to exposure of sensitive receptors to air pollution beyond those identified in the previously adopted Final EIR for the Original Project. d. Would the project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
The Modified Project, like the Original Project, could introduce developments that may generate odors that would affect the public. However, these potential developments would adhere to existing regulations during construction and operation including PHMC Sections 10462 and 10465 and VCAPCD Rule 51. With compliance to applicable local regulations, the Modified Project would not result in any new or significantly increased impacts from other emissions (such as those leading to odors) beyond those analyzed in the adopted Final EIR for the Original Project.

Agenda Item No. 13 Page 60 of 173 CC Agenda 12-16-2024
Impact Analysis
Biological Resources
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 25

3.4 Biological Resources
Where was
Impact
Analyzed in
the EIR?
Do Proposed
Changes
Require
Major
Revisions to
the EIR?
Do New
Circumstances
Require Major
Revisions to
the EIR?
Any New
Information
Resulting in
New or
Substantially
More Severe
Significant
Impacts?
Do EIR
Mitigation
Measures
Address
and/or
Resolve
Impacts?
Would the project:
a. Have a substantial adverse
effect, either directly or
through habitat
modifications, on any species
identified as a candidate,
sensitive, or special status
species in local or regional
plans, policies, or regulations,
or by the California
Department of Fish and
Wildlife or U.S. Fish and
Wildlife Service?
Pages

4.3-13
through

4.3-15
No No No N/A
b. Have a substantial adverse
effect on any riparian habitat
or other sensitive natural
community identified in local
or regional plans, policies, or
regulations, or by the
California Department of Fish
and Wildlife or U.S. Fish and
Wildlife Service?
Pages

4.3-13
through

4.3-15 and
Pages

4.3-16 and

4.3-17
No No No N/A
c. Have a substantial adverse
effect on state or federally
protected wetlands
(including, but not limited to,
marsh, vernal pool, coastal,
etc.) through direct removal,
filling, hydrological
interruption, or other
means?
Pages

4.3-16 and

4.3-17
No No No N/A
d. Interfere substantially with
the movement of any native
resident or migratory fish or
wildlife species or with
established native resident or
migratory wildlife corridors,
or impede the use of native
wildlife nursery sites?

Page 4 ends

Agenda Item No. 13 Page 61 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
26 Where was
Impact
Analyzed in
the EIR?
Do Proposed
Changes
Require
Major
Revisions to
the EIR?
Do New
Circumstances
Require Major
Revisions to
the EIR?
Any New
Information
Resulting in
New or
Substantially
More Severe
Significant
Impacts?
Do EIR
Mitigation
Measures
Address
and/or
Resolve
Impacts?
e. Conflict with any local
policies or ordinances
protecting biological
resources, such as a tree
preservation policy or
ordinance?

Page 4 ends

f. Conflict with the provisions
of an adopted Habitat
Conservation Plan, Natural
Community Conservation
Plan, or other approved local,
regional, or state habitat
conservation plan?

Page 4 ends

a. Would the project have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
The Modified Project would occur within the same Plan Area as the Original Project. As reported on page 4.3-13 of the adopted Final EIR, the Plan Area does not provide habitat for special-status species reported or known to occur in or near the Plan Area. Areas that may provide habitat for special-status species are primarily located along the shoreline and in Hueneme Beach Park, which are designated as Parks and Open Space by the GPU, and are not located within, or nearby, the Plan Area. Therefore, the Modified Project would have less-than-significant impacts to candidate, sensitive, or special status species, and would not create impacts to wildlife or associated habitats beyond those previously analyzed in the adopted Final EIR. b. Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? c. Would the project have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
The Modified Project would occur within the same Plan Area as the Original Project. As reported on pages 4.3-13 and 4.13-16 of the adopted Final EIR, there are no sensitive natural communities in the Plan Area, but areas that may provide riparian habitat or other sensitive natural communities would likely be located in the treelined corridor near Bubbling Springs Creek. The Bubbling Springs Creek riparian area is designated as Parks and Open Space in the General Plan. This General Plan designation would prevent substantial development of the habitat that this area provides and would not change under the Original Project or Modified Project.

Agenda Item No. 13 Page 62 of 173 CC Agenda 12-16-2024
Impact Analysis
Biological Resources
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 27 Wetlands within the Plan Area were identified on page 4.3-16 of the adopted Final EIR and determined that reasonably foreseeable development under the Original Project would not likely impact jurisdictional water or other surface waters and associated riparian vegetation zones, but there is a potential for development to impact such waters during construction. Potential impacts would be reduced through compliance with the requirements of the Clean Water Act, PorterCologne, and California Fish and Game Code.

Reasonably foreseeable development under the Original Project and Modified Project would be subject to the provisions of various federal, State, and local policies including the PHMC, General Plan goals, policies, and actions and LCP policies. Applicable General Plan policies that would reduce the potential impacts to riparian habitats and wetlands include Policies COS 1-1 through COS 1-7.

Adherence to federal, State, and local regulations and policies would ensure that the Modified Project would have a less-than-significant impact on riparian habitat, sensitive natural communities, and State or federally protected wetlands, and would not create impacts to riparian habitats, sensitive natural communities, or protected wetlands beyond those previously analyzed in the adopted Final EIR.
d. Would the project interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? The Modified Project would occur within the same Plan Area as the Original Project. As discussed on page 4.13-17 of the adopted Final EIR, the majority of the Plan Area is developed and urbanized and does not provide for wildlife corridors. Wildlife movement corridors are present in the coastal zone at Hueneme beach Park, Bubbling Springs Creek, and other drainages. The General Plan designates the coastal habitat at the southern end of the City and the vegetated riparian area along Bubbling Springs Creek as Parks and Open Space. This General Plan designation would prevent substantial development of the habitat that these areas provide and would not change under the Original Project or Modified Project. Therefore, the Original Project and Modified Project would not facilitate permanent development within these wildlife movement corridors. Further, compliance with General Plan Policies COS 1-3 and COS 1-4 would protect and conserve open space areas and riparian habitats, ensuring the potential impacts remain less than significant. The Modified Project would therefore not result in new or more severe impacts related to wildlife movement beyond those identified in the previously adopted Final EIR for the Original Project. e. Would the project conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
The Modified Project would occur within the same Plan Area as the Original Project. As discussed on page 4.3-18 of the adopted Final EIR, reasonably foreseeable development under the Original Project would occur in already developed areas of the Plan Area but could impact street trees or other trees. Development associated with the Original Project and Modified Project would be subject to all applicable local policies and regulations related to the protection of biological resources, including Article VI, Chapter 2, Parkway Trees of the PHMC and General Plan Policies COS 1-1 through COS 1-7 and LU 1-11. Therefore, as concluded in the Original Project, the Modified Project would not conflict with any local policies or ordinances protecting biological resources and impacts would be less than significant and the Modified Project would not create such impacts beyond those previously analyzed in the adopted Final EIR.

Agenda Item No. 13 Page 63 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
28 f. Would the project conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan?
As described on page 4.3-18 of the adopted Final EIR, there are no adopted Habitat Conservation Plans or natural Community Conservation plans within city limits. Therefore, the Original Project would have no impact related to provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or State habitat conservation plan.

Because the Modified Project would occur within the same Plan Area as the Original Project, the Modified Project would also have no impacts related to provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or State habitat conservation plan. The Modified Project would not create such impacts beyond those previously analyzed in the adopted Final EIR.

Agenda Item No. 13 Page 64 of 173 CC Agenda 12-16-2024
Impact Analysis
Cultural Resources
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 29

3.5 Cultural Resources
Where was
Impact
Analyzed in
the EIR?
Do Proposed
Changes
Require
Major
Revisions to
the EIR?
Do New
Circumstances
Require Major
Revisions to
the EIR?
Any New
Information
Resulting in
New or
Substantially
More Severe
Significant
Impacts?
Do EIR
Mitigation
Measures
Address
and/or
Resolve
Impacts?
Would the project:
a. Cause a substantial adverse
change in the significance of
a historical resource
pursuant to Section 15064.5?
Pages

4.4-13 and

4.4-14
No No No N/A
b. Cause a substantial adverse
change in the significance of
an archaeological pursuant to
Section 15064.5?
Pages

4.4-14 and

4.4-15
No No No N/A
c. Disturb any human remains,
including those interred
outside of formal
cemeteries?

Page 4 ends

a. Would the project cause a substantial adverse change in the significance of a historical resource as defined in Section 15064.5?
The adopted Final EIR determined that historical resources could potentially be impacted by development associated with the Original Project. General Plan Policies COS 8-1 through COS 8-3 would reduce potential impacts to a less-than-significant level. Because the Modified Project would occur within the same Plan Area as the Original Project, the Modified Project would also be required to comply with the aforementioned General Plan policies. Therefore, impacts to historical resources would be less than significant under the Modified Project. As such, the Modified Project would result in no new or more severe impacts on historical resources beyond those identified in the previously adopted Final EIR for the Original Project.
b. Would the project cause a substantial adverse change in the significance of an archaeological resource pursuant to Section 15064.5?
As determined in the adopted Final EIR, archaeological resources could potentially be impacted by development associated with the Original Project. General Plan Policies COS 8-5 through COS 8-7 would reduce potential impacts to a less-than-significant level. The Modified Project would occur within the same Plan Area as the Original Project and therefore be required to comply with the aforementioned General Plan policies. Therefore, impacts to significant archaeological resources would be less than significant under the Modified Project. Accordingly, the Modified Project would result in no new or more severe impacts on archaeological resources beyond those identified in the previously adopted Final EIR for the Original Project.

Agenda Item No. 13 Page 65 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
30 c. Would the project disturb any human remains, including those interred outside of formal cemeteries?
As discussed in the Final EIR for the Original Project, the discovery of human remains is always a possibility during ground disturbing activities, but the potential to find previously undiscovered remains is unlikely due to the disturbed nature of the Plan Area. If human remains are found, existing regulations outlined in the State of California Health and Safety Code Section 7050.5 state no further disturbance may occur until the County Coroner has made a determination of origin and disposition pursuant to PRC Section 5097.98. In the event of an unanticipated discovery of human remains, the County Coroner where the remains are found, must be notified immediately. If the human remains are determined to be prehistoric, the Coroner will notify the Native American Heritage Commission, which will determine and notify a most likely descendant (MLD). The MLD must complete the inspection of the site within 48 hours of being granted access and provide recommendations as to the treatment of the remains to the landowner. The Modified Project would occur within the same Plan Area as the Original Project; therefore, the likelihood for human remains within the Plan Area for the Modified Project would be identical to the Original Project. In addition, the Modified Project would also be required to adhere to California Health and Safety Code Section 7050.5; therefore, impacts to human remains would not occur and the Modified Project would result in no new or more severe impacts on human remains beyond those identified in the previously adopted Final EIR for the Original Project.

Agenda Item No. 13 Page 66 of 173 CC Agenda 12-16-2024
Impact Analysis
Energy
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 31

3.6 Energy
Where was
Impact
Analyzed in
the EIR?
Do Proposed
Changes
Require
Major
Revisions to
the EIR?
Do New
Circumstances
Require Major
Revisions to
the EIR?
Any New
Information
Resulting in
New or
Substantially
More Severe
Significant
Impacts?
Do EIR
Mitigation
Measures
Address
and/or
Resolve
Impacts?
Would the project:
a. Result in a potentially
significant environmental
impact due to wasteful,
inefficient, or unnecessary
consumption of energy
resources, during project
construction or operation?
Pages

4.5-10 and

4.5-11
No No No N/A
b. Conflict with or obstruct a
state or local plan for
renewable energy or energy
efficiency?
Pages

4.5-12 and

4.5-13
No No No N/A
a. Would the project result in a potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation?
b. Would the project conflict with or obstruct a state or local plan for renewable energy or energy efficiency?
As determined on pages 4.5-10 and 4.5-11 of the adopted Final EIR, the construction and operation of the Original Project would not result in wasteful, inefficient, or unnecessary consumption of energy resources. Similar to the Original Project, the Modified Project would comply with applicable State regulations designed to result in energy efficient performance to avoid wasteful, inefficient, or unnecessary consumption of energy, including California Code of Regulations and California Green Building Standards Code. The Modified Project would also adhere to General Plan policies CI 1-5 through CI 1-7, CI 1-10, and CI 3-1, which would improve circulation techniques by promoting reuse, infill, and mixed-use development, and promote reductions in VMT. Therefore, implementation of the Modified Project would not result in the wasteful, inefficient, or unnecessary consumption of vehicle fuels. Additionally, the Modified Project would comply with applicable State and local regulations and policies which govern energy efficiency to reduce energy use impacts. The Modified Project would therefore result in no new or more severe impacts related to wasteful, inefficient, or unnecessary consumption of energy resources; or the potential to conflict with State or local plans for renewable energy or energy efficiency, than the Original Project.

Agenda Item No. 13 Page 67 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
32 This page intentionally left blank.

Agenda Item No. 13 Page 68 of 173 CC Agenda 12-16-2024
Impact Analysis
Geology and Soils
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 33

3.7 Geology and Soils
Where was
Impact
Analyzed in
the EIR?
Do Proposed
Changes
Require
Major
Revisions to
the EIR?
Do New
Circumstances
Require Major
Revisions to
the EIR?
Any New
Information
Resulting in
New or
Substantially
More Severe
Significant
Impacts?
Do EIR
Mitigation
Measures
Address
and/or
Resolve
Impacts?
Would the project:
a. Directly or indirectly cause
potential substantial
adverse effects, including
the risk of loss, injury, or
death involving:

1. Rupture of a known
earthquake fault, as
delineated on the most
recent Alquist-Priolo
Earthquake Fault
Zoning Map issued by
the State Geologist for
the area or based on
other substantial
evidence of a known
fault?

Page 4 ends

2. Strong seismic ground
shaking?
Pages

4.6-13 and

4.6-14
No No No N/A

3. Seismic-related ground
failure, including
liquefaction?
Pages

4.6-13 and

4.6-14
No No No N/A

4. Landslides? Page 4.6-11 No No No N/A
b. Result in substantial soil
erosion or the loss of topsoil?
Page

4.6-11,

4.9-16 and

4.9-17
No No No N/A
c. Be located on a geologic unit
or soil that is unstable, or
that would become unstable
as a result of the project, and
potentially result in on- or
off-site landslide, lateral
spreading, subsidence,
liquefaction, or collapse?
Pages

4.6-13 and

4.6-14
No No No N/A
Agenda Item No. 13 Page 69 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
34 Where was
Impact
Analyzed in
the EIR?
Do Proposed
Changes
Require
Major
Revisions to
the EIR?
Do New
Circumstances
Require Major
Revisions to the
EIR?
Any New
Information
Resulting in
New or
Substantially
More Severe
Significant
Impacts?
Do EIR
Mitigation
Measures
Address
and/or
Resolve
Impacts?
d. Be located on expansive soil,
as defined in Table 18-1-B of
the Uniform Building Code
(1994), creating substantial
direct or indirect risks to life
or property?

Page 4 ends

e. Have soils incapable of
adequately supporting the
use of septic tanks or
alternative wastewater
disposal systems where
sewers are not available for
the disposal of wastewater?

Page 4 ends

f. Directly or indirectly destroy
a unique paleontological
resource or site or unique
geologic feature?
Pages

4.6-14 and

4.6-15
No No No N/A
a.1. Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? As discussed on page 4.6-11 of the Final EIR, there are no active faults in Port Hueneme. Therefore, no impact relating to rupture of a known earthquake fault would occur from implementation of the Original Project or the Modified Project, because the Modified Project would occur on the same Plan Area as the Original Project. The Modified Project would result in no new or more severe impacts beyond those identified in the previously adopted Final EIR for the Original Project. a.2. Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving strong seismic ground shaking? Potential risks and susceptibility to earthquakes and seismicity is site specific and related to proximity of the Plan Area to faults. As discussed on page 4.16-12 of the adopted Final EIR, there are no active faults within the City, but the City is within a seismically active region that is prone to earthquakes. The Final EIR determined that reasonably foreseeable development under the Original Project would expose people to ground shaking hazards. This risk of loss, injury or death involving seismic ground shaking is minimized in the Final EIR through the implementation of General Plan policies.

The Modified Project would be located on the same Plan Area as the Original Project analyzed in the adopted Final EIR. Therefore, the proximity to known earthquake faults and the potential for seismic ground shaking at the Plan Area described for the Original Project would also be applicable to the Agenda Item No. 13 Page 70 of 173 CC Agenda 12-16-2024
Impact Analysis
Geology and Soils
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 35 Modified Project. The Modified Project would not substantially increase the intensity of use of the Plan Area relative to the Original Project and would therefore also not substantially increase the number of people or structures potentially exposed to seismic risks relative to the Original Project.

Consistent with the Original Project, compliance with General Plan Policies PSF 1-2 and PSF 1-4 through PSF 1-8, the CBC, and the PHMC would minimize the risk to life and property, resulting in a less-than-significant impact. Compliance with General Plan policies, the CBC, and PHMC would ensure the Modified Project would result in no new or more severe impacts beyond those identified in the previously adopted Final EIR for the Original Project. a.3. Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving seismic-related ground failure, including liquefaction? c. Would the project be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse?
Potential risks and susceptibility to liquefaction and unstable geologic units is site specific and related to proximity of the Plan Area to faults. As discussed on page 4.16-13 of the adopted Final EIR, the entire City is located within a liquefaction hazard zone and the unconsolidated alluvium and shallow groundwater conditions are conducive to seismically include liquefaction and lateral spreading. The Final EIR determined that although reasonably foreseeable development under the Original Project would potentially be exposed to such hazards, it would not exacerbate the potential for impacts. The Modified Project would be located on the same Plan Area as the Original Project analyzed in the adopted Final EIR; therefore, the liquefaction and lateral spreading risks within the Plan Area described for the Original Project would also be applicable to the Modified Project.

Consistent with the Original Project, compliance with General Plan Policies PSF 1-2 and PSF 1-4 through PSF 1-8, the CBC, and the PHMC would minimize the potential impacts related to liquefaction and lateral spreading impacts, resulting in a less-than-significant impact. Compliance with General Plan policies, the CBC, and PHMC would ensure the Modified Project would result in no new or more severe impacts beyond those identified in the previously adopted Final EIR for the Original Project.
a.4. Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving landslides?
As discussed on page 4.6-11 of the Final EIR, Port Hueneme is not susceptible to potential landslides due to its flat topography. Therefore, no impact relating to landslides would occur from implementation of the Original Project or the Modified Project, because the Modified Project would occur on the same Plan Area as the Original Project. The Modified Project would result in no new or more severe impacts beyond those identified in the previously adopted Final EIR for the Original Project.
b. Would the project result in substantial soil erosion or the loss of topsoil? As discussed on pages 4.9-16 and 4.9-17 of the adopted Final EIR, erosion hazards would be minimal in the Plan Area because the topography of Port Hueneme is primarily flat. Compliance with PHMC Sections 7483, 7486, 8006 would require the prevention of erosion through proper site design and construction of new development or redevelopment. Compliance with the National Pollutant Discharge Elimination System (NPDES) General Construction Permit, NPDES MS4 regulations, the PHMC, and General Plan Policy COS 5-2 would reduce impacts related to erosion for the Original Agenda Item No. 13 Page 71 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
36 Project to less than significant. The Modified Project would be located on the same Plan Area as the Original Project and would comply with all aforementioned regulations and policies. Therefore, impacts related to erosion and loss of topsoil would be less than significant under the Modified Project. The Modified Project would therefore have no new or more severe significant impacts related to erosion and loss of topsoil beyond those identified in the previously adopted Final EIR for the Original Project.
d. Would the project be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial risks to life or property? As discussed on page 4.6-11 of the Final EIR, no expansive soils are located in Port Hueneme.

Therefore, no impact relating to expansive soils would occur from implementation of the Original Project or the Modified Project, because the Modified Project would occur on the same Plan Area as the Original Project. The Modified Project would result in no new or more severe impacts beyond those identified in the previously adopted Final EIR for the Original Project. e. Would the project have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater?
As discussed on page 4.6-11 of the Final EIR, reasonably foreseeable development under the Original Project would connect to the City’s existing sewer collection system and would not install septic tanks or alternative wastewater disposal systems. Therefore, no impact relating to septic tanks or alternative wastewater disposal systems would occur from implementation of the Original Project. The Modified Project would be located on the same Plan Area as the Original Project analyzed in the adopted Final EIR. Therefore, the Modified Project would also connect to the City’s existing sewer collection system and would result in no impacts relating to septic tanks or alternative wastewater disposal systems. The Modified Project would result in no new or more severe impacts related to use of septic tanks or alternative wastewater systems beyond those identified in the previously adopted Final EIR for the Original Project. f. Would the project directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
As discussed on pages 4.6-14 and 4.6-15 of the Final EIR, the geologic units underlying Port Hueneme were determined to primarily have no paleontological sensitivity and portions of the City have low paleontological sensitivity. The Final EIR determined that substantial quantities of the potential subsurface geologic units with a high paleontological sensitivity may be disturbed during ground disturbing activities associated with the Original Project. The Final EIR determined potentially significant impacts related to paleontological resources would be mitigated to a lessthan-significant level through the implementation of General Plan Policy COS 8-5. The Modified Project would be located on the same Plan Area as the Original Project analyzed in the adopted Final EIR. Therefore, impacts to paleontological resources under the Modified Project would be identical to the Original Project. With mandatory compliance to General Plan Policy COS 8-5, potentially significant paleontological resources under the Modified Project would be reduced to a less-than-significant level. In conclusion, the Modified Project would result in no new or more severe impacts to unique paleontological resources or sites or unique geologic features beyond those identified in the previously adopted Final EIR for the Original Project.

Agenda Item No. 13 Page 72 of 173 CC Agenda 12-16-2024
Impact Analysis
Greenhouse Gas Emissions
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 37

3.8 Greenhouse Gas Emissions
Where was
Impact
Analyzed in
the EIR?
Do Proposed
Changes
Require
Major
Revisions to
the EIR?
Do New
Circumstances
Require Major
Revisions to
the EIR?
Any New
Information
Resulting in
New or
Substantially
More Severe
Significant
Impacts?
Do EIR
Mitigation
Measures
Address
and/or
Resolve
Impacts?
Would the project:
a. Generate greenhouse gas
emissions, either directly or
indirectly, that may have a
significant impact on the
environment?
Pages

4.7-10
through

4.7-13
No No No N/A
b. Conflict with an applicable
plan, policy, or regulation
adopted for the purpose of
reducing the emissions of
greenhouse gases?
Pages

4.7-13
through

4.7-17
No No No N/A
a. Would the project generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?
As described beginning on page 4.7-10 of the adopted Final EIR, construction of the Original Project would generate approximately 61,183 metric tons of greenhouse gas (GHG) emissions per year, measured as carbon dioxide equivalent (CO2e), amortized over the life of the project. The thresholds of significance used to evaluate the significance of GHG emissions under the Modified Project are consistent with those utilized in the adopted Final EIR, specifically the California Air Resources Board (CARB) Scoping Plan Goal of carbon neutrality by 2045.

Construction of the reasonably foreseeable development associated with the Modified Project would generate temporary GHG emissions primarily as a result of operation of construction equipment onsite as well as from vehicles transporting construction workers to and from individual project sites and heavy trucks to transport building materials. Citywide operation of reasonably foreseeable development associated with the Modified Project would also generate GHG emissions associated with area sources (e.g., landscape maintenance), energy and water usage, vehicle trips, and wastewater and solid waste generation. Construction and operational GHG emissions associated with existing uses within the R-4 zone and NIO under the Original Project and future uses within the R-4 zone and NIO under the Modified Project were estimated using CalEEMod version 2022.1. Please note CalEEMod does not factor in future reductions from regulations or technology; therefore, the estimate for future uses within the R-4 zone and NIO under the Modified Project are conservative in nature. Furthermore, there is no applicable threshold for this project type to evaluate under CEQA; therefore, these estimates are shown for informational purposes only. Impact determination is therefore determined based on consistency with applicable GHG plans.

Agenda Item No. 13 Page 73 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
38 Table 5 Combined Annual GHG Emissions Within R-4 Zone and NIO Emission
Source
Existing Emissions (MT of
CO2e per year)
Total 2045 Buildout Emissions (MT
of CO2e per year)
Change from Existing (MT of
CO2e per year)
Operational
Area 16.8 27.7 10.9
Energy 1,536 2,526 990
Mobile 4,756 7,823 3,067
Solid Waste 313 514 201
Water 111 183 72
Refrigerant 1.54 2.54 1
Total Emissions 6,734 11,076 4,341.9
MT = metric tons; CO2e = carbon dioxide equivalents.

See Appendix A for CalEEMod modeling results
As shown in Table 5, future uses within the R-4 zone and NIO under the Modified Project would generate a combined annual GHG emissions of approximately 11,076 MT of CO2e per year, or 0.4 MT of CO2e per service person per year. The net change in GHG emissions associated with the R-4 zone density increase and implementation of the NIO under the Modified Project would be a net increase of approximately 4,341.9 MT of CO2e per year and the Citywide per-service-person emissions of the Original Project with the Modified Project in 2045 would be approximately 0.4 MT of CO2e per service person per year.

Climate Action Plan (CAP) policies were adopted as part of the Original Project and are intended to reduce GHG emissions to meet the 2017 CARB Scoping Plan target of carbon neutrality by 2045.

Implementation of CAP Policies CAP 1-1, CAP 1-2, CAP 1-3, CAP 2-1, CAP 3-1, CAP 3-2, CAP 4-1, and CAP 5-1 would reduce GHG emissions associated with the Modified Project. As with the Original Project, Citywide GHG emissions associated with buildout of the proposed Modified Project would be reduced by implementation of existing regulations as well as CAP policies, listed above.

Therefore, similar to the Original Project, Citywide GHG emissions impacts associated with buildout of the Modified Project would be less than significant. As such, the Modified Project would result in no new impacts related to Citywide GHG emissions or impacts that would be substantially more severe than those discussed in the adopted Final EIR for the Original Project. b. Conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
Several plans have been adopted to reduce GHG emissions in Port Hueneme and at the State level, including the CARB’s 2022 Scoping Plan and the SCAG RTP/SCS. Similar to the Original Project, individual projects under the Modified Project would comply with applicable State and local energy efficiency, renewable energy, green building, water conservation, and solid waste diversion requirements for new construction. Furthermore, the Modified Project would not be a substantial source of high global warming potential gases, and individual projects would comply with any future changes in air conditioning, fire protection suppressant, and other requirements. As with the Original Project, the Modified Project would comply with all relevant General Plan policies, listed above, to ensure the Modified Project would not conflict with the California Air Resources Board’s 2022 Scoping Plan. As a result, as with the Original Project, the Modified Project would be consistent with the Agenda Item No. 13 Page 74 of 173 CC Agenda 12-16-2024
Impact Analysis
Greenhouse Gas Emissions
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 39 CARB’s 2022 Scoping Plan and the 2020 RTP/SCS. Therefore, similar to the Original Project, plan consistency impacts associated with buildout of the Modified Project would be less than significant.

As such, the Modified Project would result in no new impacts related to consistency with GHG emission reduction plans or impacts that would be substantially more severe than those discussed in the adopted Final EIR for the Original Project.

Agenda Item No. 13 Page 75 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
40 This page intentionally left blank.

Agenda Item No. 13 Page 76 of 173 CC Agenda 12-16-2024
Impact Analysis
Hazards and Hazardous Materials
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 41

3.9 Hazards and Hazardous Materials
Where was
Impact
Analyzed in
the EIR?
Do Proposed
Changes
Require
Major
Revisions to
the EIR?
Do New
Circumstances
Require Major
Revisions to
the EIR?
Any New
Information
Resulting in
New or
Substantially
More Severe
Significant
Impacts?
Do EIR
Mitigation
Measures
Address
and/or
Resolve
Impacts?
Would the project:
a. Create a significant hazard to
the public or the
environment through the
routine transport, use, or
disposal of hazardous
materials?
Pages

4.8-13
through

4.8-15
No No No N/A
b. Create a significant hazard to
the public or the
environment through
reasonably foreseeable upset
and accident conditions
involving the release of
hazardous materials into the
environment?
Pages

4.8-13
through

4.8-15
No No No N/A
c. Emit hazardous emissions or
handle hazardous or acutely
hazardous materials,
substances, or waste within

0.25 mile of an existing or
proposed school?
Pages

4.8-15 and

4.8-16
No No No N/A
d. Be located on a site that is
included on a list of
hazardous material sites
compiled pursuant to
Government Code Section
65962.5 and, as a result,
would it create a significant
hazard to the public or the
environment?
Pages

4.8-16
through

4.8-18
No No No N/A
e. For a project located in an
airport land use plan or,
where such a plan has not
been adopted, within two
miles of a public airport or
public use airport, would the
project result in a safety
hazard or excessive noise for
people residing or working in
the project area?
Page

4.11-21
No No No N/A
Agenda Item No. 13 Page 77 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
42 Where was
Impact
Analyzed in
the EIR?
Do Proposed
Changes
Require
Major
Revisions to
the EIR?
Do New
Circumstances
Require Major
Revisions to
the EIR?
Any New
Information
Resulting in
New or
Substantially
More Severe
Significant
Impacts?
Do EIR
Mitigation
Measures
Address
and/or
Resolve
Impacts?
f. Impair implementation of or
physically interfere with an
adopted emergency response
plan or emergency
evacuation plan?
Pages

4.8-18 and

4.8-19
No No No N/A
g. Expose people or structures,
either directly or indirectly,
to a significant risk of loss,
injury, or death involving
wildland fires?

Page 4 ends

a. Would the project create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? b. Would the project create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?
As described on page 4.8-13 of the adopted Final EIR, the overall quantity of hazardous materials and waste generated in the Plan Area could incrementally increase as a result of implementation of the Original Plan. Potential impacts related to hazardous materials would be reduced by compliance with the policies and guidelines established by the Code of Federal Regulations, the California Code of Regulations, the California Health and Safety Code, the Ventura County Hazardous Materials Emergency Response Plan, and General Plan Policies PSF 2-1 through PSF 2-8. The Modified Project would occur within the same Plan Area as the Original Project and would be required to comply with the aforementioned policies and guidelines. In addition, the Modified Project would not substantially change the use or transport of hazardous materials on or around the Plan Area; therefore, the Modified Project would result in no new or more severe impacts beyond those identified in the previously adopted Final EIR for the Original Project. c. Would the project emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within 0.25 mile of an existing or proposed school? As described on pages 4.8-15 and 4.8-16 of the adopted Final EIR, new commercial development associated with the Original Project could occur within one-quarter mile of an existing or potential future school. Potential impacts related to hazardous materials near schools would be reduced by compliance with the California Fire Code, the California Health and Safety Code, and General Plan Policy CI 1-8. The Modified Project would occur within the same Plan Area as the Original Project and would also be required to comply with the California Fire Code, California Health and Safety Code, and General Plan Policy CI 1-8, which would reduce hazardous impacts to schools within

0.25 mile of the Plan Area to a less-than-significant level. In addition, the Modified Project would not substantially change the use or transport of hazardous materials on or around the Plan Area; Agenda Item No. 13 Page 78 of 173 CC Agenda 12-16-2024
Impact Analysis
Hazards and Hazardous Materials
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 43 therefore, the Modified Project would result in no new or more severe impacts beyond those identified in the previously adopted Final EIR for the Original Project. d. Would the project be located on a site that is included on a list of hazardous material sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
As described on page 4.8-16 of the adopted Final EIR, demolition and/or renovation activities associated with the Original Project would potentially encounter asbestos-containing materials (ACMs), lead-based paint (LBP), and/or polychlorinated biphenyls (PCBs). The removal of ACMs and LBP is subject to federal, State, and local regulations, including the U.S. Environmental Protection Agency, California Occupational and Safety Administration, and the California Code of Regulations.

Compliance with existing laws and regulations regarding ACMs, LBP, and PCBs would reduce potential impacts to a less-than-significant level.

Page 4 ends

concentration of hazardous material sites. Potential impacts related to hazardous material sites would be reduced by compliance with the policies and guidelines established by the Department of Toxic Substances Control, County of Ventura standards, and General Plan Policies PSF 2-1 through PSF 2-3, PSF 2-5, and PSF 2-7. The Modified Project would occur on the same Plan Area as the Original Project. Therefore, the Modified Project would be consistent with the findings of the adopted Final EIR for the Original Project and impacts would be less than significant. The Modified Project would have no new or more severe impacts related to contaminated sites beyond the finding of no impact identified in the previously adopted Final EIR for the Original Project. e. For a project located in an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? As described on page 4.11-21 of the adopted Final EIR, the closest airport to the Plan Area is the Oxnard Airport, located 1.1 miles north of the City and the Plan Area is not located within safety zones or noise contours of the Oxnard Airport Master Plan (County of Ventura 2004). Therefore, reasonably foreseeable development under the Original Project would not expose people to excessive noise levels from airport noise and no impact would occur. The Modified Project would occur on the same Plan Area as the Original Project and would thus not result in new or substantially more severe significant impacts related to airport safety hazard or excessive noise beyond those identified in the previously adopted Final EIR for the Original Project. f. Would the project impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
As discussed on pages 4.8-18 and 4.8-19 of the adopted Final EIR, the proposed land use changes associated with the Original Project would not result in changes to the City’s circulation patterns or emergency access/evacuation routes. Additionally, the Original Project includes the Public Safety and Facilities Element which addresses Senate Bill (SB) 379 requirements through General Plan Goals CI 1 and CI 2 and Policies PSF 2-4, PSF 2-6, and CI 2-1. Development associated with the Original Project would be reviewed and approved by the City’s Building and Safety Division and the County of Ventura Fire Department, which includes site plan review for emergency access and circulation. The Modified Project would not substantially change the overall project’s potential to conflict with an adopted emergency response plan or emergency evacuation plan or interfere with Agenda Item No. 13 Page 79 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
44 traffic on adjacent streets because the Modified Project would be required to comply with the same SB 379 requirements as the Original Project, and future development under the Modified Project would be subject to review and approval by the City’s Building and Safety Division and County of Ventura Fire Department. The Modified Project would therefore have no new or more severe impacts beyond those identified in the previously adopted Final EIR for the Original Project. g. Would the project expose people or structures, either directly or indirectly, to a significant risk of loss, injury, or death involving wildland fires?
As discussed on page 4.16-1 of the adopted Final EIR, the Plan Area is located five miles from the nearest State Responsibility Area and Very High Fire Hazard Severity Zone. Additionally, no land within the City is subject to wildfire hazards. Because the Modified Project would occur within the same Plan Area as the Original Project, the Modified Project would be consistent with the wildland fire findings of the adopted Final EIR. Therefore, development of the Modified Project would not expose persons or structures to wildland fire hazard risks and the Modified Project would not result in new or more severe impacts related to wildland fires beyond those identified in the previously adopted Final EIR for the Original Project.

Agenda Item No. 13 Page 80 of 173 CC Agenda 12-16-2024
Impact Analysis
Hydrology and Water Quality
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 45

3.10 Hydrology and Water Quality
Where was
Impact
Analyzed in
the EIR?
Do Proposed
Changes
Require
Major
Revisions to
the EIR?
Do New
Circumstances
Require Major
Revisions to
the EIR?
Any New
Information
Resulting in
New or
Substantially
More Severe
Significant
Impacts?
Do EIR
Mitigation
Measures
Address
and/or
Resolve
Impacts?
Would the project:
a. Violate any water quality
standards or waste discharge
requirements or otherwise
substantially degrade surface
or ground water quality?
Pages

4.9-12
through

4.9-14
No No No N/A
b. Substantially decrease
groundwater supplies or
interfere substantially with
groundwater recharge such
that the project may impede
sustainable groundwater
management of the basin?
Pages

4.9-15 and

4.9-16
No No No N/A
c. Substantially alter the
existing drainage pattern of
the site or area, including
through the alteration of the
course of a stream or river or
through the addition of
impervious surfaces, in a
manner which would:
(i) Result in substantial
erosion or siltation onor off-site
Pages

4.9-16 and

4.9-17
No No No N/A
(ii) Substantially increase
the rate or amount of
surface runoff in a
manner which would
result in flooding on- or
off-site
Pages

4.9-17 and

4.9-18
No No No N/A
(iii) Create or contribute
runoff water which
would exceed the
capacity of existing or
planned stormwater
drainage systems or
provide substantial
additional sources of
polluted runoff
Pages

4.9-17 and

4.9-18
No No No N/A
Agenda Item No. 13 Page 81 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
46 Where was
Impact
Analyzed in
the EIR?
Do Proposed
Changes
Require
Major
Revisions to
the EIR?
Do New
Circumstances
Require Major
Revisions to
the EIR?
Any New
Information
Resulting in
New or
Substantially
More Severe
Significant
Impacts?
Do EIR
Mitigation
Measures
Address
and/or
Resolve
Impacts?
(iv) Impede or redirect flood
flows?
Pages

4.9-18 and

4.9-19
No No No N/A
d. In flood hazard, tsunami, or
seiche zones, risk release of
pollutants due to project
inundation?
Pages

4.9-18 and

4.9-19
No No No N/A
e. Conflict with or obstruct
implementation of a water
quality control plan or
sustainable groundwater
management plan?
Pages

4.9-15 and

4.9-16
No No No N/A
a. Would the project violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality? The Modified Project would be located on the same Plan Area as the Original Project. Hydrological conditions related to soils and hydrology on and around the site have not changed since adoption of the Final EIR, and the Modified Project would result in roughly the same amount of soil disturbance and conversion of pervious to impervious surfaces as the Original Project. As with the Original Project, construction activity associated with the Modified Project, including grading, could have the potential to degrade water quality due to sediment erosion or the presence of contaminants located within the soils, but short-term stormwater pollutant discharges would be mitigated through compliance with the applicable NPDES permitting process, resulting in a less-than-significant impact.

As discussed in the Final EIR for the Original Project, reasonably foreseeable development associated with the Modified Project could also potentially result in the addition of contaminants into both stormwater runoff entering the City’s drainage system and wastewater entering the local wastewater collection and treatment system, ultimately degrading surface water and groundwater quality. Future developments would be subject to the provisions of the Ventura County NPDES MS4 Permit, Sections 7452 through 7455 of the PHMC, and General Plan Policies COS 5-2 through COS 5-4, PSF 5-3, PSF 7-2, and PSF 7-3. Compliance with applicable regulations and permits would reduce the Modified Project’s potential water quality impacts to a less-than-significant level. The Modified Project would result in no new or more severe impacts related to water quality and wastewater discharge requirements beyond those identified in the previously adopted Final EIR for the Original Project.

Agenda Item No. 13 Page 82 of 173 CC Agenda 12-16-2024
Impact Analysis
Hydrology and Water Quality
Addendum to the City of Port Hueneme’s 2021 General Plan Environmental Impact Report 47 b. Would the project substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin?
e. Would the project conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?
As stated on page 4.9-15 of the adopted Final EIR, the Original Project could incrementally increase impervious surfaces and increase the demand for water within the Plan Area. However, both the Original Project and Modified Project would be required to comply with the Los Angeles Regional Water Quality Control Board’s Basin Plan and the Ventura County’s MS4 permit which includes best management practices (BMPs) for stormwater runoff retention. General Plan Policy COS 5-1 would require conservation of water resources through coordination with the Fox Canyon Groundwater Management Agency which developed the Groundwater Sustainability Plan applicable to the Plan Area. The Modified Project would result in roughly the same amount of conversion of pervious to impervious surfaces and increase in water demand as the Original Project. Development associated with the Original Project and Modified Project would be required to comply with applicable State, regional, and local regulations, including the PHMC, which encourage water conservation and reduce potential impacts to groundwater supply. Therefore, the Modified Project would result in less-than-significant impacts to groundwater supplies and groundwater recharge. The Modified Project would have no new or more severe significant impacts beyond those identified in the previously adopted Final EIR for the Original Project.
c. Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
i. Result in substantial erosion or situation on- or off-site? As discussed on pages 4.9-16 and 4.9-17 of the adopted Final EIR, construction activities associated with reasonably foreseeable development under the Original Project would result in the alteration of drainage patterns. Erosion hazards would be minimal in the Plan Area because the topography of Port Hueneme is primarily flat. Compliance with PHMC Sections 7483, 7486, 8006 would require the prevention of erosion through proper site design and construction of new development or redevelopment. Compliance with the NPDES General Construction Permit, NPDES MS4 regulations, the PHMC, and General Plan Policy COS 5-2 would reduce impacts related to erosion for the Original Project to less than significant. The Modified Project would be located on the same site as the Original Project and would therefore result in similar drainage patterns and erosion hazards; therefore, the Modified Project would also be required to comply with all aforementioned regulations and policies to reduce impacts to a level of less than significant. The Modified Project would have no new or more severe significant impacts related to erosion and siltation beyond those identified in the previously adopted Final EIR for the Original Project.

Agenda Item No. 13 Page 83 of 173 CC Agenda 12-16-2024
City of Port Hueneme
Housing Element Program Implementation
48 c. Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
ii. Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site?
iii. Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? As discussed on page 4.9-18 of the adopted Final EIR, portions of the Plan Area are within the 500-year flood zone, but implementation of General Plan Policies PSF 1-1 and PSF 7-1 and compliance with applicable PHMC regulations would minimize risks associated with increased runoff and potential flooding. Specifically, General Plan Policy PSF 1-1 requires mitigation for development and redevelopment in flood hazard areas including the use of flood resistant construction methods, materials, and practices and certification by a registered professional engineer. The General Plan policies and existing regulations discussed under Threshold a of this section and the General Plan policies discussed above would prevent substantial increases in runoff, and would not result in onor off-site flooding, an exceedance of the capacity of storm drainage systems, or substantial additional sources of polluted runoff as a result of the Original Project.

The Modified Project would be located on the same Plan Area as the Original Project. Drainage and runoff conditions related to soils and hydrology on and around the Plan Area have not changed since adoption of the Final EIR; therefore, the Modified Project would, like the Original Project, not result in on- or off-site flooding, an exceedance of the capacity of storm drainage systems, or substantial additional sources of polluted runoff and would have no new or more severe significant impacts in this regard beyond those identified in the previously adopted Final EIR for the Original Project.
c. Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
iv. Impede or redirect flood flows?
d. In flood hazard, tsunami, or seiche zones, would the project risk release of pollutants due to project inundation?
As discussed on page 4.9-18 of the adopted Final EIR, portions of the Plan Area are within the 500-year flood zone, but implementation of General Plan Policies PSF 1-1 and PSF 7-1 and compliance with applicable PHMC regulations would minimize risks associated with storm flooding.

Page 4 ends
← All documents from this meeting