Cities Index.
Agenda packet

Porterville City Council
July 18, 2023

Document
Agenda packet
Meeting
July 18, 2023
Body
Porterville City Council
Pages
24
Original file
122.7 MB
Text extracted from the city's file for reading and search. Open the original on portervilleca.api.civicclerk.com. That file is the official record.

RESOLUTION NO. __________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORTERVILLE

CERTIFYING TO THE COUNTY OF TULARE THE VALIDITY OF THE LEGAL PROCESS

USED TO PLACE DIRECT CHARGES (SPECIAL ASSESSMENTS) ON THE SECURED

TAX ROLL
WHEREAS, the notices and election for special assessment fees for the purpose of sewer construction to be included on the regular County property tax bill for property owners of the Area 455 Sewer Utility District was completed on November 19, 2013; and WHEREAS, the City is placing the special assessments on the Tulare County secured property tax roll for collection; and
WHEREAS, the City has complied with all laws pertaining to the levy of the special assessments to be collected; and
WHEREAS, the monies collected are not in any way to be based on the assessed valuation of the properties involved; and
WHEREAS, the City agrees that it shall be solely liable and responsible, and will defend and hold the County of Tulare harmless from any liability as a result of claims or claims for refunds and related interest due filed by taxpayers against any assessments, fees, charges or taxes placed on the roll for the City by the County; and
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Porterville that the list submitted with parcel numbers and amount are certified as being correct, the City Manager, John D. Lollis, or City Engineer, Daniel Cervantez, are hereby authorized to sign any documents required and directed to give the list to the Tulare County Auditor on behalf of the City for placement on the secured tax roll for collection:

1. Parcel and Assessment listing

2. Direct Charge (Special Assessment) Control Sheet

3. Direct Charge (Special Assessment) Change Authorization Sheet

4. Compliance Certification and Hold Harmless Statement PASSED, APPROVED AND ADOPTED, this 18h day of July, 2023. ____________________________________
ATTEST: Martha A. Flores, Mayor
John D. Lollis, City Clerk
By: __________________________________
Patrice Hildreth, Chief Deputy City Clerk

Page 1 of 1 ends

RESOLUTION NO. __________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORTERVILLE

CERTIFYING TO THE COUNTY OF TULARE THE VALIDITY OF THE LEGAL PROCESS

USED TO PLACE DIRECT CHARGES (SPECIAL ASSESSMENTS) ON THE SECURED

TAX ROLL
WHEREAS, the notices and election for special assessment fees for the purpose of sewer construction to be included on the regular County property tax bill for property owners of the Area 456 A, B & C, and E Henderson Ave Sewer Utility District was completed on September 4, 2018; and
WHEREAS, the City is placing the special assessments on the Tulare County secured property tax roll for collection; and
WHEREAS, the City has complied with all laws pertaining to the levy of the special assessments to be collected; and
WHEREAS, the monies collected are not in any way to be based on the assessed valuation of the properties involved; and
WHEREAS, the City agrees that it shall be solely liable and responsible, and will defend and hold the County of Tulare harmless from any liability as a result of claims or claims for refunds and related interest due filed by taxpayers against any assessments, fees, charges or taxes placed on the roll for the City by the County; and
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Porterville that the list submitted with parcel numbers and amount are certified as being correct, the City Manager, John D. Lollis, or City Engineer, Daniel Cervantez, are hereby authorized to sign any documents required and directed to give the list to the Tulare County Auditor on behalf of the City for placement on the secured tax roll for collection:

1. Parcel and Assessment listing

2. Direct Charge (Special Assessment) Control Sheet

3. Direct Charge (Special Assessment) Change Authorization Sheet

4. Compliance Certification and Hold Harmless Statement PASSED, APPROVED AND ADOPTED, this 18th day of July, 2023. ____________________________________
ATTEST: Martha A. Flores, Mayor
John D. Lollis, City Clerk
By: __________________________________
Patrice Hildreth, Chief Deputy City Clerk

Page 1 of 1 ends

RESOLUTION NO. __________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORTERVILLE

CERTIFYING TO THE COUNTY OF TULARE THE VALIDITY OF THE LEGAL PROCESS

USED TO PLACE DIRECT CHARGES (SPECIAL ASSESSMENTS) ON THE SECURED

TAX ROLL
WHEREAS, the notices and election for special assessment fees for the purpose of sewer construction to be included on the regular County property tax bill for property owners of the Area 458 Sewer Utility District was completed on May 7, 2013; and WHEREAS, the City is placing the special assessments on the Tulare County secured property tax roll for collection; and
WHEREAS, the City has complied with all laws pertaining to the levy of the special assessments to be collected; and
WHEREAS, the monies collected are not in any way to be based on the assessed valuation of the properties involved; and
WHEREAS, the City agrees that it shall be solely liable and responsible, and will defend and hold the County of Tulare harmless from any liability as a result of claims or claims for refunds and related interest due filed by taxpayers against any assessments, fees, charges or taxes placed on the roll for the City by the County; and
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Porterville that the list submitted with parcel numbers and amount are certified as being correct, the City Manager, John D. Lollis, or City Engineer, Daniel Cervantez, are hereby authorized to sign any documents required and directed to give the list to the Tulare County Auditor on behalf of the City for placement on the secured tax roll for collection:

1. Parcel and Assessment listing

2. Direct Charge (Special Assessment) Control Sheet

3. Direct Charge (Special Assessment) Change Authorization Sheet

4. Compliance Certification and Hold Harmless Statement PASSED, APPROVED AND ADOPTED, this 18th day of July, 2023. ____________________________________
ATTEST: Martha A. Flores, Mayor
John D. Lollis, City Clerk
By: __________________________________
Patrice Hildreth, Chief Deputy City Clerk

Page 1 of 1 ends

RESOLUTION NO. __________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORTERVILLE

CERTIFYING TO THE COUNTY OF TULARE THE VALIDITY OF THE LEGAL PROCESS

USED TO PLACE DIRECT CHARGES (SPECIAL ASSESSMENTS) ON THE SECURED

TAX ROLL
WHEREAS, the notices and election for special assessment fees for the purpose of sewer construction to be included on the regular County property tax bill for property owners of the Area 459A & C Sewer Utility District was completed on February 17, 2015; and WHEREAS, the City is placing the special assessments on the Tulare County secured property tax roll for collection; and
WHEREAS, the City has complied with all laws pertaining to the levy of the special assessments to be collected; and
WHEREAS, the monies collected are not in any way to be based on the assessed valuation of the properties involved; and
WHEREAS, the City agrees that it shall be solely liable and responsible, and will defend and hold the County of Tulare harmless from any liability as a result of claims or claims for refunds and related interest due filed by taxpayers against any assessments, fees, charges or taxes placed on the roll for the City by the County; and
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Porterville that the list submitted with parcel numbers and amount are certified as being correct, the City Manager, John D. Lollis, or City Engineer, Daniel Cervantez, are hereby authorized to sign any documents required and directed to give the list to the Tulare County Auditor on behalf of the City for placement on the secured tax roll for collection:

1. Parcel and Assessment listing

2. Direct Charge (Special Assessment) Control Sheet

3. Direct Charge (Special Assessment) Change Authorization Sheet

4. Compliance Certification and Hold Harmless Statement PASSED, APPROVED AND ADOPTED, this 18th day of July, 2023. ____________________________________
ATTEST: Martha A. Flores, Mayor
John D. Lollis, City Clerk
By: __________________________________
Patrice Hildreth, Chief Deputy City Clerk

Item No. 13.

CITY COUNCIL AGENDA – JULY 18, 2023
SUBJECT: Preliminary Annual Engineer's Report of Assessments for Landscape and Lighting Maintenance Districts and Setting a Public Hearing SOURCE: Parks and Leisure Services
COMMENT: The City has created seventy-four (74) Landscape and Lighting Maintenance Districts (LLMD's) since 1989. A separate LLMD has been established for each new land development. Many of the LLMD's only contain street lighting, for which the assessment is to collect only a portion of the street lighting cost.

Other LLMD's have landscape improvements installed within public right-ofway or public properties, in addition to the street lighting. In these instances, landscaping has been established to provide a more aesthetic appearance and a healthier environment. Only the property owners who directly benefit from improvements are assessed for the maintenance.

Annually, a process of evaluating maintenance needs and establishing an assessment for each LLMD must be followed. In an effort to facilitate the needs of each LLMD, staff analyzes fund balances and deficits for each LLMD, as well as projected expenditures and reserves. Based on the analysis, staff determined that not all LLMD's will be assessed this fiscal year.

The first attached draft Resolution is necessary to initiate the annual Engineer's Report, which will show the proposed assessments for the 2023-2024 Fiscal Year. The second draft Resolution provides preliminary approval to the Engineer's Report for the 2023-2024 Fiscal Year. The comprehensive annual Engineer's Report is provided as an attachment. Once the assessments are approved by the City Council, they are transmitted to the County of Tulare for placement upon the tax bill of the property owners and indicated as a special assessment. The third Resolution declares the intent of the Council to levy and collect the assessments for the 2023-2024 Fiscal Year, and sets a Public Hearing on the assessments for August 1, 2023.

RECOMMENDATION: That the City Council:

1. Adopt a draft Resolution ordering the preparation of an Engineer's Report for the Landscape and Lighting Maintenance Districts for the 2023-2024 Fiscal Year;

2. Adopt a draft Resolution giving preliminary approval to the Engineer's Report for the Landscape and Lighting Maintenance Districts for the 2023-2024 Fiscal Year;

3. Adopt a draft Resolution declaring the intent to levy and collect assessments for the 2023-2024 Fiscal Year, and offering a time Item No. 13.
and place for hearing objections thereto; and

4. Schedule a Public Hearing for August 1, 2023 at 6:30 P.M., regarding the Engineer's Report and proposed assessments for the Landscape and Lighting Maintenance Districts for the 2023-2024 Fiscal Year.

ATTACHMENTS: 1. Draft Resolution - Preparation of Engineer's Report

2. Draft Resolution - Preliminary Approval of Engineer's Report

3. Draft Engineers Report

4. Draft Resolution - Intent to Levy Assessments and Conduct Public Hearing
Appropriated/Funded:

Review By:

Department Director:

Donnie Moore, Parks and Leisure Services Director
Final Approver: John Lollis, City Manager
RESOLUTION NO.: _______-2023

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORTERVILLE ORDERING THE PREPARATION OF AN ENGINEER’S REPORT FOR LANDSCAPE AND LIGHTING MAINTENANCE DISTRICTS FOR FISCAL YEAR 2023-2024 WHEREAS, the City Council of the City of Porterville has determined that the public interest, convenience and necessity required the maintenance of lighting systems, landscape planting materials, irrigation systems and appurtenances in designated areas of the City; and WHEREAS, the City has established assessment districts to recover the cost of maintenance work; and
WHEREAS, Section 22622 of the California Streets and Highways Code requires that an Engineer’s Report be prepared and filed annually, outlining the assessments to be levied against the properties within the assessment district.

NOW, THEREFORE, be it resolved by the City Council of the City of Porterville that:

1. Javier Sanchez, Jr. is appointed “Engineer of Work” for preparation of the Engineer’s Report.

2. The Engineer of Work is ordered to prepare the report for Fiscal Year 2023-2024 in accordance with Article 4, Division 15, of the Streets and Highways Code, “Landscaping and Lighting Act of 1972” of the State of California.

PASSED, APPROVED AND ADOPTED this 18th day of July 2023. ___________________________________
Martha A. Flores, Mayor
ATTEST:

John D. Lollis, City Clerk
By: ____________________________________
Patrice Hildreth, Chief Deputy City Clerk

Page 1 of 2 ends

RESOLUTION NO.: _______-2023

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORTERVILLE GIVING PRELIMINARY APPROVAL OF ENGINEER’S REPORT FOR
FISCAL YEAR 2023-2024 FOR LANDSCAPE AND LIGHTING

MAINTENANCE DISTRICTS
WHEREAS, on the 18th day of July 2023, said City Council did adopt a Resolution directing the Engineer of Work to make and file with the City Clerk of said City a report in writing for Fiscal Year 2023-2024 as required by the Landscaping and Lighting Act of 1972; and WHEREAS, said Engineer of Work has made and filed with the City Clerk of said City a report in writing as called for in said Resolution and under and pursuant to said Act, which report has been presented to this Council for consideration; and WHEREAS, said Council has duly considered said report and each and every part thereof, and finds that each and every part of said report is sufficient, and that said report, nor any part thereof, requires or should be modified.

NOW, THEREFORE, be it resolved by the City Council of the City of Porterville that:

1. The Engineer’s Estimate of the itemized costs and expenses of said work and of the incidental expenses in connection therewith, contained in said report be, and each of them are hereby, preliminarily approved and confirmed.

2. The diagram showing the Assessment Districts referred to and described in said report (the boundaries of the subdivision of land within each said Assessment District) are approved and confirmed as the same as existed at the time of passage of Resolution originally establishing each District.

3. The proposed assessments upon the subdivisions of land in said Assessment Districts are in proportion to the estimated benefit to be received by said subdivisions, respectively, from said normal and customary maintenance and of the incidental expenses thereof, as contained in said report, and are hereby preliminarily approved and confirmed.

4. Said report shall stand as the Engineer’s Report for the purposes of all subsequent proceedings, and pursuant to the proposed district.

Reference is hereby made to said maps for further, full and more particular description of said Assessment District, and the same maps so on file shall govern for all details as to the extent of each said Assessment District.
///
///

Page 2 of 2 ends

PASSED, APPROVED AND ADOPTED this 18th day of July 2023. _____________________________
Martha A. Flores, Mayor
ATTEST:

John D. Lollis, City Clerk
By: __________________________________
Patrice Hildreth, Chief Deputy City Clerk

Page 1 of 11 ends

RESOLUTION NO.: _______-2023

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORTERVILLE,

COUNTY OF TULARE, STATE OF CALIFORNIA, DECLARING ITS

INTENTION TO LEVY AND COLLECT ASSESSMENTS FOR FISCAL YEAR 2023-2024 IN LANDSCAPE AND LIGHTING MAINTENANCE ASSESSMENT DISTRICTS; DECLARING THE WORK TO BE OF MORE THAN LOCAL OR ORDINARY PUBLIC BENEFIT; SPECIFYING THE EXTERIOR BOUNDARIES

OF THE AREAS WITHIN THE LANDSCAPE MAINTENANCE DISTRICTS TO BE ASSESSED THE COST AND EXPENSE THEREOF; DESIGNATING SAID DISTRICT AS LANDSCAPE AND LIGHTING MAINTENANCE DISTRICTS;

DETERMINING THAT THESE PROCEEDINGS SHALL BE TAKEN
PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972; AND

OFFERING A TIME AND PLACE FOR HEARING OBJECTIONS THERETO The City Council of the City of Porterville, pursuant to the provisions of the Landscaping and Lighting Act of 1972, being Division 15 of the Streets and Highways Code of the State of California, does resolve as follows:

DESCRIPTION OF WORK
SECTION 1. That the public interest and convenience requires it is the intention of the City Council of the City of Porterville, California, to order the following work be done, to wit:

1. Maintenance and servicing of facilities and landscaping as authorized by Section 22525 of the Streets and Highways Code.

2. Any and all work and materials appurtenant thereto or which are necessary or convenient for the maintenance and servicing thereof.

LOCATION OF WORK
SECTION 2. The foregoing described work is to be located within the following areas:

1. Right-of-way and easement along the Westwood Street frontage of Unit I and II of Westwood Estates, more particularly described on maps which are on file in the City Clerk’s office entitled “Landscape and Lighting Maintenance District No. 1.”

2. Annexation No. 2 = Hillcrest Street right-of-way, fire access road, Jasmine Drive entries; west perimeter including the parcel on which the water tank is located, viewpoint look-out

3. Annexation No. 3 = Porter Creek Avenue right-of-way to the center line of the Porter Slough, median entry, 15' landscape area between Porter Creek Subdivision block wall to

4. Annexation No. 4 = LaVida Park Subdivision green belt, east on Plum Way Street and the entries east along Beverly Street.

Page 2 of 11 ends

5. Annexation No. 5 = Westwood Estates #4 Subdivision, along the north and south entries adjacent to the block wall on Westwood Street and the median divider on White Chapel Lane including all trees in front yard planting strip.

6. Annexation No. 6 =Northpointe Subdivision includes lighting located south of Westfield Avenue and east of Mathew Street.

7. Annexation No. 10 = Westview Subdivision located on the corner of Westfield Avenue and Cobb Street.

8. Annexation No. 11 = New Horizons Phase One Subdivision and the remainder parcel located along Springville Ave, and Indiana Street.

9. Annexation No. 14 = Wisconsin Manor One Subdivision located on the corner of Wisconsin Way.

10. Annexation No. 16 = New Horizons Phase Two located on the corner of Indiana Street and Springville Avenue

11. Annexation No. 19 = Castle Woods Phase One Subdivision location along Castle Avenue and Newcomb Street.

12. District No. 2 = North Creek Estates located on Westwood north of Westfield.

13. District No. 3 – New Expressions Phase One Subdivision located along Indiana Street between Springville Avenue and Cleo Avenue.

14. District No. 4 = River Springs Phase One Subdivision located along Newcomb Street. 15 District No. 5 = Castle Woods Phase Two Subdivision located at Median Avenue and Salisbury.

16. District No. 6 = Creekview Estates located between Porter Creek Avenue and the property line in Porter Slough.

17. District No. 7 = Ford Estates located on the corner of Roby and Westwood Avenue.

18. District No. 8 = River Breese located on Newcomb Street Between Pasty and Spring Streets.

19. District No. 12 = Westwood Estates, Unit Five, Phase Two, located on Henderson Avenue and Brandy Way.

20. District No. 15 = Meadowood, Phase One Subdivision, located on Newcomb Street, Cheryl Avenue and York Street.

21. District No. 16 = New Expressions Phase Two Subdivision, located on Lybarger Avenue Cul de Sac at the entry to the Tule River Parkway Trail.

22. District No. 17 = Orchard Ridge Phase Six Subdivision located north of Westfield Avenue between Michael Street and Lombardi Street on Julieann Avenue and Michael Stree.

23. District No. 19 = Williams Ranch, Phase One Located south of Westfield Avenue on Silver Maple Street, Wall Court and San Lucia Court.

Page 3 of 11 ends

24. District No. 23 = River Estates Phase Three Subdivision located Roby Avenue, Belmont, Orange Avenue, Forest Avenue and Parkwest Street.

25. District No. 24 = Orchard Ridge, Phase Eight Subdivision located on Mathew Street, Michael Street, Pamela Avenue and Santa Maria Avenue.

26. District No. 25 = Casas Del Rio Subdivision located on Date Street, Casas Del Rio Avenue, Presidio Avenue, Rio Bonito Street, Alamo Court, Camallia Street, Tule Court and Rio Vista Avenue.

27. District No. 26 = Orchard Ridge, Phase Nine Subdivision located on Belmont Street, Pamela, Santa Maria and Pioneer Avenues.

28. District No. 29 = River Springs Phase Three Subdivision located on Date Avenue, River Springs Drive and Atkins Court.

29. District No. 30 = Sierra Meadows, Phase One, Subdivision located at Indiana Street and Gibbons Avenue.

30. District No. 31 = Williams Ranch, Phase Two and Three Subdivision on Westwood Street between Henderson and Westfield Avenues.

31. District No. 32 = Sunrise Villa, Phase One Subdivision located at Cottage Street and Mulberry Avenue.

32. District No. 33 = New Expressions, Phase Four Subdivision located on Indiana Street, between Springville Avenue and the Tule River.

33. District No. 34 = Meadow Breeze, Phase Three Subdivision located on Matthew Street, Michael Place, Verdugo Place, Lu Ann Place, Belmont Place, Brian Avenue and Castle Avenue.

34. District No. 35 = Meadow Breeze, Phase One Subdivision located on Pioneer Avenue and Salisbury Street.

35. District No. 38 = Ranch Victoria, Phase One Subdivision located on the north side of Putnam Avenue and east of Mathew Street

36. District No. 40 = Amalene Estates Subdivision located on Westwood between the Tule River and Olive Avenue, including Vine Avenue, Clare Avenue, Clare Court, and Dogwood Street.

37. District No. 43 = Sierra Meadows Phase Two Subdivision located on Jaye Street and Gibbons Avenue and including Stacie, Yates and Melinda Avenues and Mesa Oak and Pearson Streets.

38. District No. 44 = Summit Estates, Phase One Subdivision located along Mathew Street and includes Orange Avenue and Lombardi and Argyle Streets.

39. District No. 46 = Moorea Manor Subdivision located along Newcomb and includes San Lucia Lane.

40. District No. 53 = Trooper Terrace Subdivision located on the east side of Westwood Street between Henderson Avenue and Luisa Avenue.

Page 4 of 11 ends

41. District No. 54 = Windsor Court Cambria Subdivision located on the northwest corner of Henderson Avenue and Elderwood Street.

42. District 57 = The Villas at Sierra Meadows Phase One right-of-way and easement along Jaye Street frontage of Lots 1 and 28, as well as right-of-way along Joan Ave, S. Lone Oak Ct, and Western Street.

43. District 58 = The Villas at Sierra Meadows Phase Two right-of-way along the frontages of Joan Avenue, Western Street, Richard Avenue, Mesa Oak St, and Brown Avenue.

44. District 59 = The Villas at Sierra Meadows Phase Three right-of-way along the frontages of Joan Avenue, Mesa Oak Street and South Howland Court of The Villas at Sierra Meadows

DESCRIPTION OF ASSESSMENT DISTRICT
SECTION 3. That the contemplated work, in the opinion of said City Council, is to be of more than local or ordinary public benefit, and the said City Council hereby makes the expense of the said work chargeable upon a district, which said district is described as follows:

1. All that certain territory of the City of Porterville, included within the exterior boundary line shown upon that certain "Map of Landscape and Lighting Maintenance District No. 1,” heretofore approved by the City Council of said City by Resolution No. 26-89, indicating by said boundary line the extent of the territory included within the assessment district and which map is on file in the Office of the City Clerk of said City.

2. All that certain territory of the City of Porterville, included within the exterior boundary line shown upon that certain "Map of Annexation No. 2 to Landscape and Lighting Maintenance District No. 1," heretofore approved by the City Council of said City by Resolution No. 42-92, indicating by said boundary line the extent of the territory included within the district and which map is on file in the Office of the City Clerk of said City.

3. All that certain territory of the City of Porterville, included within the exterior boundary line shown upon that certain “Map of Annexation No. 3 to Landscapes and Lighting Maintenance District No. 1” heretofore approved by the City Council of said City by Resolution No. 69-93 indicating by said boundary line the extent of the territory included within the district and which map is on file in the Office of the City Clerk of said City.

4. All that certain territory of the City of Porterville, included within the exterior boundary line shown upon that certain "Map of Annexation No. 4 to Landscape and Lighting Maintenance District No. 1," heretofore approved by the City Council of said City by Resolution No. 100-93, indicating by said boundary line the extent of the territory included within the assessment district and which map is on file in the Office of the City

Page 5 of 11 ends

Clerk of said City.

5. Westwood Park Estates #4, along the north and south entries adjacent to the block wall on Westwood Street and the median divider on White Chapel Lane including all trees in front yard planting strip, more particularly described on maps which are on file in the City Clerk’s office entitled “Annexation No. 5 to Landscape and Lighting Maintenance District No. 1”.

6. All that certain territory of the City of Porterville, included within the exterior boundary line shown upon that certain “Map of Annexation No. 6 to Landscape and Lighting Maintenance District No. 1” heretofore approved by the City Council of said City by Resolution No. 54-94 indication by said boundary line the extent of the territory included within the assessment district and which map is on file in the Office of the City Clerk of said City.

7. All that certain territory of the City of Porterville, included within the exterior boundary line shown upon that certain "Map of Annexation No. 10 to Landscape and Lighting Maintenance District No. 1." heretofore approved by the City Council of said City by Resolution No. 46-95 indicating by said boundary line the extent of the territory included within the district and which map is on file in the Office of the City Clerk of said City.

8. All that certain territory of the City Of Porterville, included within the exterior boundary line shown upon that certain “Map of Annexation No. 11 to Landscape and Lighting Maintenance District No. 1” heretofore approved by the City Council of said City by Resolution No. 79-95 indicating by said boundary line the extent of the territory included within the district and which map is on file in the Office of the City Clerk of said City.

9. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Annexation No. 14 to Landscape and Lighting Maintenance District No. 1," heretofore approved by the City Council of said City by Resolution No. 24-96, indicating by said boundary line the extent of the territory included within the district and which map is on file in the Office of the City Clerk of said City.

10. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Annexation No.16 to Landscape and Lighting Maintenance District No. 1" heretofore approved by the City Council of said City by Resolution No. 33-96 indicating by said boundary line the extent of the territory included within the district and which map is on file in the office of the City Clerk of said City.

11. All that certain territory of the City Of Porterville, included within the exterior boundary shown upon that certain “Map of Annexation No. 19 to Landscape and

Page 6 of 11 ends

Lighting Maintenance District No. I heretofore approved by the City Council of said City by Resolution No. 56-96 indication by said boundary line the extent of the territory included within the district and which map is on file in the office of the City Clerk of said City.

12. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 2” heretofore approved by the City Council of said City by Resolution No. 126-98 indicating by said boundary like the extent of the territory included within the assessment district and which map is on file in the office of the City Clerk of said City.

13. All that certain “Map of Landscape and Lighting District No. 3" heretofore approved by the City Council of said City by Resolution No. 127-98 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

14. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 4" heretofore approved by the City Council of said City by Resolution No. 128-98 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

15. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 5," heretofore approved by the City Council of said City by Resolution No. 29-2002, indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the Office of the City Clerk of said City.

16. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 6," heretofore approved by the City Council of said City by Resolution No. 89-99, indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the Office of the City Clerk of said City.

17. All that certain “Map of Landscape and Lighting District No. 7" heretofore approved by the City Council of said City by Resolution No.67-99 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

18. All that certain “Map of Landscape and Lighting District No. 8" heretofore approved by the City Council of said City by Resolution No.120-99 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

19. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 12," heretofore

Page 7 of 11 ends

approved by the City Council of said City by Resolution No. 65-2000, indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the Office of the City Clerk of said City.

20. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No.15” heretofore approved by the City Council of said City by Resolution No. 55-2001 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

21. All that certain “Map of Landscape and Lighting District No. 16" heretofore approved by the City Council of said City by Resolution No. 91-2001 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

22. All that certain “Map of Landscape and Lighting District No. 17" heretofore approved by the City Council of said City by Resolution No. 114-2001 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

23. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 19,” heretofore approved by the City Council of said City by Resolution No. 23-2002 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the Office of the City Clerk of said City.

24. All that certain “Map of Landscape and Lighting District No. 23" heretofore approved by the City Council of said City by Resolution No. 94-2002 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

25. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 24," heretofore approved by the City Council of said City by Resolution No. 191-2002 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the Office of the City Clerk of said City.

26. All that certain “Map of Landscape and Lighting District No. 25" heretofore approved by the City Council of said City by Resolution No.58-2003 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

27. All that certain “Map of Landscape and Lighting District No. 26" heretofore approved by the City Council of said City by Resolution No.59-2004 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

Page 8 of 11 ends

28. All that certain “Map of Landscape and Lighting District No. 29” heretofore approved by the City Council of said City by Resolution No. 90-2004 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

29. All that certain territory of the City of Porterville included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 30,” heretofore approved by the City Council of said City by Resolution No. 52-2003 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

30. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 31," heretofore approved by the City Council of said City by Resolution No. 52-2006 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the Office of the City Clerk of said City.

31. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 32,” heretofore approved by the City Council of said City by Resolution No. 52-2006 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the Office of the City Clerk of said City.

32. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 33,” heretofore approved by the City Council of said City by Resolution No. 52-2006 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the Office of the City Clerk of said City.

33. All that certain “Map of Landscape and Lighting District No. 34" heretofore approved by the City Council of said City by Resolution No. 52-2006 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

34. All that certain territory of the City of Porterville, included within the exterior boundary Shown upon that certain “Map of Landscape and Lighting District No. 35," heretofore approved by the City Council of said City by Resolution No. 52-2006 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the Office of the City Clerk.

35. All that certain “Map of Landscape and Lighting District No. 38” heretofore approved by the City Council of said City by Resolution No. 38-2007 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

Page 9 of 11 ends

36. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 40," heretofore approved by the City Council of said City by Resolution No. 37-2008 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the Office of the City Clerk of said City.

37. All that certain “Map of Landscape and Lighting District No. 43" heretofore approved by the City Council of said City by Resolution No. 37-2008 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

38. All that certain “Map of Landscape and Lighting District No. 44" heretofore approved by the City Council of said City by Resolution No. 37-2000 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

39. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 46" heretofore approved by the City Council of said City by Resolution No.91-2009 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

40. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 53" heretofore approved by the City Council of said City by Resolution No. 51-2020 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

41. All that certain territory of the City of Porterville, included within the exterior boundary shown upon that certain “Map of Landscape and Lighting District No. 54" heretofore approved by the City Council of said City by Resolution No. 51-202 indicating by said boundary line the extent of the territory included with the assessment district and which map is on file in the office of the City Clerk of said City.

42. All that certain territory of the City of Porterville, included within the exterior boundary line shown upon that certain “Map of the Landscape and Lighting Maintenance District No. 57,” heretofore approved by the City Council of said City by Resolution No. -2023 indicating by said boundary line the extent of the territory included within the assessment district and which map is on file in the Office of the City Clerk of said City.

43. All that certain territory of the City of Porterville, included within the exterior boundary line shown upon that certain “Map of Landscape and Lighting Maintenance District No. 58,” heretofore approved by the City Council of said City by Resolution No. - 2023, indicating by said boundary line the extent of the territory included within the assessment district and which map is on file in the Office of the City Clerk.

Page 10 of 11 ends

44. All that certain territory of the City of Porterville, included within the exterior boundary line shown upon that certain “Map of Landscape and Lighting Maintenance District No. 59,” heretofore approved by the City Council of said City by Resolution No. - 2023, indicating by said boundary line the extent of the territory included within the assessment district and which map is on file in the Office of the City Clerk.

SECTION 4. The City Council of said City has ordered preparation of the annual report of the Engineer of Work, which report indicates the amount of the proposed assessment, the district boundary, detailed description of improvements, and the method of assessment. The report titled "Engineer's Report, Landscape and Lighting Maintenance Districts 2022-2023 Fiscal Year” will be filed in the Office of the City Clerk of said City, and prepared for the 2022-2023 Fiscal Year in accordance with the Landscaping and Lighting Act of 1972. Reference to said report is hereby made for all particulars for the amount and extent of the assessments and for the extent of the work.

COLLECTION OF ASSESSMENTS
SECTION 5. The assessment shall be collected at the time and in the same manner as County taxes are collected.

TIME AND PLACE OF HEARING
SECTION 6. Notice is hereby given that on the 1st day of August 2023, at the hour of 6:30 P.M., or as soon thereafter as the matter may be heard, in the City Council Chambers at 291 North Main Street, in the City of Porterville, any and all persons having any objections to the work or extent of the assessment district, may appear and show cause why said work should not be done or carried out in accordance with this Resolution of Intention. The City Council will consider all oral and written protests.

LANDSCAPING AND LIGHTING ACT OF 1972
SECTION 7. All the work herein proposed shall be done and carried through in pursuance of an act of the legislature of the State of California designated The Landscaping and Lighting Act of 1972, being Division 15 of the Streets and Highways Code of the State of California.

PUBLICATION OF RESOLUTION OF INTENTION
SECTION 8. Published notice shall be made pursuant to Section 6061 of the Government Code. The publication of the Notice of Hearing shall be completed at least 10 days prior to the date of hearing.

CERTIFICATION
SECTION 9. The City Clerk shall certify to the adoption of this Resolution.

Page 11 of 11 ends

PASSED, APPROVED AND ADOPTED THIS 18th day of July, 2023. ________________________________
Martha A. Flores, Mayor
ATTEST:

John D. Lollis, City Clerk

By: _________________________________
Patrice Hildreth, Chief Deputy City Clerk
Item No. 14.

CITY COUNCIL AGENDA – JULY 18, 2023
SUBJECT: Engineer's Reports and Setting of a Public Hearing for Establishing Landscape and Lighting Maintenance Districts and Tax Assessments for Parcels Within The Villas At Sierra Meadows Phases One, Two and Three
SOURCE: Parks and Leisure Services
COMMENT: New subdivisions within the City are required to petition for the formation of a Maintenance Assessment District. The Districts are formed to secure funding from parcels within the subdivisions for operational and maintenance expenses of public lighting and any public landscape areas. The City utilizes the authority governed by the 1972 Landscape and Lighting Assessment Act to create a District for each subdivision. Thereafter, every year a process must be followed of evaluating maintenance needs and establishing an assessment to be placed upon the tax rolls for every parcel within each District.

The attached draft Resolutions are necessary to initiate the process of creating new Districts for the Villas at Sierra Meadows Phases 1, 2 and 3 subdivisions.

The first draft Resolution is to order the formation of the new Districts, appoint the City Engineer as the Engineer of Work, and order the preparation of Engineer's Reports. The Engineer's Reports accompany this staff report. The second draft Resolution is provided to give preliminary approval to the Reports as the basis for creation of proposed assessments. The final draft Resolution declares the intent to form the Districts, levy and collect tax assessments, and schedule a Public Hearing for August 1, 2023.

RECOMMENDATION: That the City Council:

1. Adopt the draft Resolution ordering the proceedings for formation of Landscape and Lighting Maintenance District Numbers 57, 58 and 59, and ordering the preparation of the Engineer's Reports; and

2. Adopt the draft Resolution giving preliminary approval to the Engineer's Reports; and

3. Adopt the draft Resolution declaring intent to form districts, levy and collect assessments, and setting a Public Hearing for August 1, 2023.

ATTACHMENTS: 1. Draft Resolution - District Formation Proceedings

2. Draft Resolution - Accept the Engineer's Reports

3. Draft Engineer's Reports

4. Draft Resolution - District Formation Intent

5. Final Map - The Villas at Sierra Meadows Phase 1
Item No. 14.

6. Final Map - The Villas at Sierra Meadows Phase 2

7. Final Map - The Villas at Sierra Meadows Phase 3
Appropriated/Funded:

Review By:

Department Director:

Donnie Moore, Parks and Leisure Services Director
Final Approver: John Lollis, City Manager
RESOLUTION NO. -2023

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORTERVILLE,

COUNTY OF TULARE, STATE OF CALIFORNIA, ORDERING PROCEEDINGS

FOR THE FORMATION OF LANDSCAPE AND LIGHTING MAINTENANCE DISTRICT NUMBERS 57, 58, AND 59

ORDERING PREPARATION OF A DISTRICT MAP INDICATING

THE PROPOSED DISTRICT BOUNDARY FOR EACH OF THE DISTRICTS,

ASSIGNING AN ENGINEER OF WORK, AND
ORDERING THE PREPARATION OF ENGINEER’S REPORTS
WHEREAS, it has been determined by the City Council of the City of Porterville that the public interest, convenience and necessity required the installation and planting of landscape materials, the installation and construction of irrigation systems, the installation of lighting and other facilities set forth in Section 22525 of the Streets and Highways Code, State of California; and
WHEREAS, the cost for operation and maintenance of the landscaping and lighting improvements is to be determined and considered for assessment to the benefiting properties; and WHEREAS, Section 22622 requires that an Engineer’s Report be prepared to establish new Landscape and Lighting Maintenance Districts, and outlining the initial assessments to be levied against the properties within each assessment district.

NOW THEREFORE, BE IT RESOLVED, by the City Council of the City of Porterville as follows:

1. That the public interest, convenience and necessity required the formation of Landscape and Lighting Maintenance District numbers 57, 58, and 59 and as authorized by Section 22525 of the Streets and Highways Code, State of California.

2. That proceedings are to be conducted for the formation of said Landscape and Lighting Maintenance Districts.

3. That the properties to be specifically charged for maintenance of landscaping and lighting improvements shall be located within the boundary of the proposed districts, and maps to illustrate said boundaries are hereby ordered to be prepared.

4. That Javier Sanchez be appointed as “Engineer of Work” with all applicable provisions of Article 4, Division 15 of the Landscape and Lighting Act of 1972 applied to said “Engineer of Work”.

5. That the cost of maintaining the landscape and lighting facilities in each of said Landscape and Lighting Maintenance Districts shall be borne by the property owners within the district, and said cost shall be assessed according to said 1972 Act.

6. That the Engineer of Work is hereby ordered to prepare a report for each District in accordance with Article 4, Division 15 of said 1972 Act.

APPROVED AND ADOPTED THIS 18th day of July, 2023.

_________________________________
Martha A. Flores, Mayor

ATTEST:

John Lollis, City Clerk
By: _________________________________
Patrice Hildreth, Chief Deputy City Clerk
RESOLUTION NO. -2023

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORTERVILLE,

COUNTY OF TULARE, STATE OF CALIFORNIA, GIVING PRELIMINARY APPROVAL OF ENGINEER’S REPORTS FOR LANDSCAPE AND

LIGHTING MAINTENANCE DISTRICTS ENCOMPASSING

THE VILLAS AT SIERRA MEADOWS PHASE ONE, THE VILLAS AT SIERRA

MEADOWS PHASE TWO, AND THE VILLAS AT SIERRA MEADOWS PHASE THREE
WHEREAS, on the 18th day of July, 2023 said City Council did direct by Resolution that the Engineer of Work was to make and file with the City Clerk of said City a report in writing for each subdivision as required by the Landscaping and Lighting Act of 1972; and WHEREAS, said Engineer of Work has made and filed with the City Clerk of said City each report in writing as called for in said Resolution and under and pursuant to said Act, which reports have been presented to this Council for consideration; and WHEREAS, said Council has duly considered said reports and each and every part thereof, and finds that each and every part of said reports is sufficient, and that said reports nor any part thereof, requires or should be modified; and
WHEREAS, reference is hereby made to said Engineer’s Reports for further, full and more particular description of proposed Assessment Districts, and the same Engineer’s Reports so on file, shall govern for all details as to the extent of said Assessment Districts.

NOW THEREFORE, BE IT RESOLVED, by the City Council of the City of Porterville as follows:

1. That the Engineer’s Estimate of the itemized costs and expenses of said work and of the incidental expenses in connection therewith, contained in said reports be, and each of them are hereby preliminarily approved and confirmed.

2. That the diagram showing the Assessment District referred to and described in said reports, the boundaries of the subdivision of land within said Assessment District as the same existed at the time of passage of said Resolution, are hereby preliminarily approved and confirmed.

3. That the proposed assessments upon the subdivisions of land in each said Assessment District is in proportion to the estimated benefit to be received by said subdivisions, respectively, from said work and of the incidental expenses thereof, as contained in said report, is hereby preliminarily approved and confirmed.

4. That said reports shall stand as the Engineer’s Report for the purposes of all subsequent proceedings pursuant to each of the proposed districts.

APPROVED AND ADOPTED THIS 18th day of July, 2023.
______________________________
Martha A. Flores, Mayor
ATTEST:

John Lollis, City Clerk
By: _________________________________
Patrice Hildreth, Acting Chief Deputy City Clerk

CITY OF PORTERVILLE
ENGINEER’S REPORT FOR LANSCAPING AND LIGHTING
MAINTENANCE DISTRICT NO. 57
SECTION 1. Authority for Report
This report is prepared by order of the City Council of the City of Porterville Resolution No. -2023. The report is in compliance with the requirement of Article 4, Chapter 1, Division 15 of the Streets and Highways Code, State of California (Landscape and Lighting Act of 1972).

SECTION 2. General Description
The City Council has elected to include landscaping and lighting at The Villas at Sierra Meadows, Phase One Subdivision into the Landscape and Lighting Maintenance District No. 57.

The City Council has determined that the areas to be landscaped and lighted will have an effect upon all parcels within the proposed boundaries of the District. The areas for street lights are included on all the streets within the subdivision. The landscaping includes 1,050 feet of masonry wall located on the south side of the subdivision that runs along the trail of the Poplar Ditch and along S. Jaye St. The landscape and wall maintenance includes: irrigation, mowing, pruning, cleaning, repairing, painting, vegetation and rodent control, and an amount set aside for replacement.

SECTION 3. Plans and Specifications
The plans and specifications for the lighting were prepared by the developer and are in conformance with the requirements of the City of Porterville. All lights to be maintained will be shown on the subdivision maps as roadway rights-of-way, or easements to be granted to the City of Porterville. The total street lights to be maintained are 10. Total landscaped area to be maintained is 1,050 lineal feet of masonry wall, and 25,737 square feet of landscaped area.

Maintenance activities within the Landscape and Lighting Maintenance District No. 57 are to include landscape and lighting maintenance.

SECTION 4. Improvements
Landscape and lighting improvements were made by the developer of The Villas at Sierra Meadows, Phase One Subdivision.

SECTION 5. Estimated Costs
The construction cost will be borne by the developer and will not be assessed. The subdivision map has been filed for record and the improvements have been installed.

Estimated Assessment 2023-2024
Maintenance 25, 737 sq.ft, of landscaping area, 1,050 lf. of masonry wall Lighting 10 @ 5,800 lumens
Project Management 28 lots
Fund Balance $ -
Landscape 25,737 sq. ft. @ $0.150 = $ 3,860.55
Graffiti Maintenance 25,737 sq. ft. @ $0.005 = $ 128.69 Tree Maintenance 25,737 sq. ft. @ $0.004 = $ 102.95
Postage/Printing 25,737 sq. ft. @ $0.006 = $ 154.42
Utilities 25,737 sq. ft. @ $0.071 = $ 1,827.33
Repair/Maintenance 25,737 sq. ft. @ $0.006
$0.242

= $ 154.42
= $ 6,228.36
Maintenance
Administrative Fee
25,737 sq.ft. $0.242
$6,228.36 x $0.10
= $ 6,228.36
= $ 622.84

County Fee 28 lots @ $ 1.00 per lot = $ 28.00
Reserves 15% total cost of Maintenance = $ 934.25
$ 7,813.45
Estimated Cost Per Year $$ 7,813.45/28 = $ 279.04
**Lighting costs are based on 29% benefit of total cost because lights are spaced closer together resulting in 40% more lights than the city standard outside the maintenance district.

After the 2023/2024 fiscal year, the assessments shall be increased with the cost of service. The increased cost of services shall be the lesser of the actual prior year’s cost or the prior year’s estimated cost adjusted according to the annualized Consumer Price Index rate. The Consumer Price Index is based on the San Francisco Model, and any increase for the year 2023/2024 will refer back to the prior year’s CPI. In the event that the costs of services provided do not increase to exceed the full amount of CPI from one year, such excess CPI percentage shall be carried over from year to year and may be utilized to increase the amount of assessment in future years.

SECTION 6. Assessment Diagram
A copy of the proposed assessment diagram entitled “Landscape and Lighting Maintenance District No. 57 is attached to this report and by reference is made part thereof.

SECTION 7. Assessment
The initial cost of constructing improvements has been borne by the developer. The improvement areas are established for the benefit of all properties within the proposed Landscape and Lighting Maintenance District No. 57. The establishment and maintenance of the improvements is a vital part of the development of The Villas at Sierra Meadows, Phase One Subdivision. The City Council of Porterville has determined that to ensure satisfactory levels of maintenance for the landscape and lighting at The Villas at Sierra Meadows, Phase One Subdivision, it should become Landscape and Lighting Maintenance District No. 57. The subdivision consists of 28 Lots. The Landscape area, which benefits the 28 lots, is located along the south side of the subdivision that runs along the trail of the Poplar Ditch and along S. Jaye St.

Landscape and Lighting Maintenance District No. 57 will consist of an area comprising approximately 6.53 acres. A total of 28 lots are proposed to be developed. The improvements will consist of those improvements described in Section 4 of this report. The maintenance of the improvements is a vital part of the development for the protection or safety, economic and humanistic values. The City Council has determined that, for the preservation of values incorporated within this development, all lots will receive equal benefit from the landscaping and street lighting.

The determination of benefits takes into consideration the following facts:

1. The purpose of the improvements is to provide a favorable aesthetic appearance of the area.

2. Properly maintained landscaping and lighting benefits all properties in the development.

3. The lots not adjacent to the landscaping and lighting facility improvements benefit for the maintenance equally to those lots adjacent to the improvements.

Estimated 2023-2024 Assessment
Assessment (A) = $ 7,813.41 .
28 A= $ 7,813.41 . = $ 279.04 per lot for The Villas at Sierra Meadows I 28 Total Assessment for 2023-2024 = $ 7,813.41
Total developed lot count is 28 lots.

SECTION 8. Order of Events

1. City Council adopts Resolution Instituting Proceedings, appoints an Engineer of Work and Orders Engineer’s Report.

2. City Council Adopts Resolution of Preliminary Approval of Engineer’s Report.

3. City Council Adopts Resolution of Intention to Order the Formation of Landscape and Lighting Maintenance District No. 57 and determines the district.

4. City Council adopts Resolution Ordering the Improvements and the Formation of Landscape and Lighting Maintenance District No. 57.

5. Every year between April and June the Engineer of Work file a report with the City Council.

6. Every year between April and June, the City Council conducts a public hearing and approves, or modifies the individual assessments.
________________________________
Javier Sanchez, Jr.

Engineer of the Work

CITY OF PORTERVILLE
ENGINEER’S REPORT FOR LANSCAPING AND LIGHTING
MAINTENANCE DISTRICT NO. 58
SECTION 1. Authority for Report
This report is prepared by order of the City Council of the City of Porterville Resolution No. -2023. The report is in compliance with the requirement of Article 4, Chapter 1, Division 15 of the Streets and Highways Code, State of California (Landscape and Lighting Act of 1972).

SECTION 2. General Description
The City Council has elected to include landscaping and lighting at The Villas at Sierra Meadows, Phase Two Subdivision into the Landscape and Lighting Maintenance District No. 58.

The City Council has determined that the areas to be landscaped and lighted will have an effect upon all parcels within the proposed boundaries of the District. The areas for street lights are included on all the streets within the subdivision. The landscaping includes 3,207 square feet located along South Western and West Joan Ave. The landscape maintenance includes:
irrigation, mowing, pruning, cleaning, repairing, painting, vegetation and rodent control, and an amount set aside for replacement.

SECTION 3. Plans and Specifications
The plans and specifications for the lighting were prepared by the developer and are in conformance with the requirements of the City of Porterville. All lights to be maintained will be shown on the subdivision maps as roadway rights-of-way, or easements to be granted to the City of Porterville. The total street lights to be maintained are 10. Total landscaped area to be maintained is 3,207 square feet of landscaped area.

Maintenance activities within the Landscape and Lighting Maintenance District No. 58 are to include landscape and lighting maintenance.

SECTION 4. Improvements
Landscape and lighting improvements were made by the developer of The Villas at Sierra Meadows, Phase Two Subdivision.

SECTION 5. Estimated Costs
The construction cost will be borne by the developer and will not be assessed. The subdivision map has been filed for record and the improvements have been installed.

Estimated Assessment 2023-2024
Maintenance 3,207 sq.ft, of landscaping area
Lighting 10 @ 5,800 lumens
Project Management 39 lots
Fund Balance $ -
Landscape 3,207 sq. ft. @ $0.150 = $ 481.05
Graffiti Maintenance 3,207 sq. ft. @ $0.005 = $ 16.04
Tree Maintenance 3,207 sq. ft. @ $0.004 = $ 12.83
Postage/Printing 3,207 sq. ft. @ $0.006 = $ 19.24
Utilities 3,207 sq. ft. @ $0.071 = $ 227.70
Repair/Maintenance 3,207 sq. ft. @ $0.006
$0.242

= $ 19.24
= $ 776.10
Maintenance
Administrative Fee
3,207 sq.ft. $0.242
$776.10 x $0.10
= $ 776.10
= $ 76.61

County Fee 39 lots @ $ 1.00 per lot = $ 39.00
Reserves 15% total cost of Maintenance = $ 116.42
$ 1,008.13
Estimated Cost Per Year $$ 1,008.13/39 = $ 25.85
**Lighting costs are based on 29% benefit of total cost because lights are spaced closer together resulting in 40% more lights than the city standard outside the maintenance district.

After the 2023-2024 fiscal year, the assessments shall be increased with the cost of service. The increased cost of services shall be the lesser of the actual prior year’s cost or the prior year’s estimated cost adjusted according to the annualized Consumer Price Index rate. The Consumer Price Index is based on the San Francisco Model, and any increase for the year 2023/2024 will refer back to the prior year’s CPI. In the event that the costs of services provided do not increase to exceed the full amount of CPI from one year, such excess CPI percentage shall be carried over from year to year and may be utilized to increase the amount of assessment in future years.

SECTION 6. Assessment Diagram
A copy of the proposed assessment diagram entitled “Landscape and Lighting Maintenance District No. 58 is attached to this report and by reference is made part thereof.

SECTION 7. Assessment
The initial cost of constructing improvements has been borne by the developer. The improvement areas are established for the benefit of all properties within the proposed Landscape and Lighting Maintenance District No. 58. The establishment and maintenance of the improvements is a vital part of the development of The Villas at Sierra Meadows, Phase Two Subdivision. The City Council of Porterville has determined that to ensure satisfactory levels of maintenance for the landscape and lighting at The Villas at Sierra Meadows, Phase Two Subdivision, it should become Landscape and Lighting Maintenance District No. 58. The subdivision consists of 39 Lots. The Landscape area, which benefits the 39 lots, is located at the south side of the subdivision that runs along the trail of the Poplar Ditch and along S. Jaye St.

Landscape and Lighting Maintenance District No. 58 will consist of an area comprising approximately 14.5 acres. A total of 39 lots are proposed to be developed. The improvements will consist of those improvements described in Section 4 of this report. The maintenance of the improvements is a vital part of the development for the protection or safety, economic and humanistic values. The City Council has determined that, for the preservation of values incorporated within this development, all lots will receive equal benefit from the landscaping and street lighting.

The determination of benefits takes into consideration the following facts:

4. The purpose of the improvements is to provide a favorable aesthetic appearance of the area.

5. Properly maintained landscaping and lighting benefits all properties in the development.

6. The lots not adjacent to the landscaping and lighting facility improvements benefit for the maintenance equally to those lots adjacent to the improvements.

Estimated 2023-2024 Assessment
Assessment (A) = $ 1,008.13 .
39 A= $ 1,008.13 . = $ 25.84 per lot for The Villas at Sierra Meadows II 39 Total Assessment for 2023-2024 = $ 1,008.13
Total developed lot count is 39 lots.

SECTION 8. Order of Events

7. City Council adopts Resolution Instituting Proceedings, appoints an Engineer of Work and Orders Engineer’s Report.

8. City Council Adopts Resolution of Preliminary Approval of Engineer’s Report.

9. City Council Adopts Resolution of Intention to Order the Formation of Landscape and Lighting Maintenance District No. 58 and determines the district.

10. City Council adopts Resolution Ordering the Improvements and the Formation of Landscape and Lighting Maintenance District No. 58.

11. Every year between April and June the Engineer of Work file a report with the City Council.

12. Every year between April and June, the City Council conducts a public hearing and approves, or modifies the individual assessments.
________________________________
Javier Sanchez, Jr.

Engineer of the Work

CITY OF PORTERVILLE
ENGINEER’S REPORT FOR LANSCAPING AND LIGHTING
MAINTENANCE DISTRICT NO. 59
SECTION 1. Authority for Report
This report is prepared by order of the City Council of the City of Porterville Resolution No. -2023. The report is in compliance with the requirement of Article 4, Chapter 1, Division 15 of the Streets and Highways Code, State of California (Landscape and Lighting Act of 1972).

SECTION 2. General Description
The City Council has elected to include landscaping and lighting at The Villas at Sierra Meadows, Phase Three Subdivision into the Landscape and Lighting Maintenance District No.

59. The City Council has determined that the areas to be landscaped and lighted will have an effect upon all parcels within the proposed boundaries of the District. The areas for street lights are included on all the streets within the subdivision. The landscaping includes 619 feet of masonry wall located on the south side of the subdivision that runs along the trail of the Poplar ditch, as well as 17,302 square feet of landscape. The landscape and wall maintenance includes:
irrigation, mowing, pruning, cleaning, repairing, painting, vegetation and rodent control, and an amount set aside for replacement.

SECTION 3. Plans and Specifications
The plans and specifications for the lighting were prepared by the developer and are in conformance with the requirements of the City of Porterville. All lights to be maintained will be shown on the subdivision maps as roadway rights-of-way, or easements to be granted to the City of Porterville. The total street lights to be maintained are 7. Total landscaped area to be maintained is 619 lineal feet of masonry wall, and 17,302 square feet of landscaped area.

Maintenance activities within the Landscape and Lighting Maintenance District No. 59 are to include landscape and lighting maintenance.

SECTION 4. Improvements
Landscape and lighting improvements were made by the developer of The Villas at Sierra Meadows, Phase Three Subdivision.

SECTION 5. Estimated Costs
The construction cost will be borne by the developer and will not be assessed. The subdivision map has been filed for record and the improvements have been installed.

Estimated Assessment 2023-2024
Maintenance 17,302 sq.ft, of landscaping area, 619 lf. of masonry wall Lighting 7 @ 5,800 lumens
Project Management 39 lots
Fund Balance $ -
Landscape 17,302 sq. ft. @ $0.150 = $ 2,595.30
Graffiti Maintenance 17,302 sq. ft. @ $0.005 = $ 86.51
Tree Maintenance 17,302 sq. ft. @ $0.004 = $ 69.21
Postage/Printing 17,302 sq. ft. @ $0.006 = $ 103.81
Utilities 17,302 sq. ft. @ $0.071 = $ 1,228.44
Repair/Maintenance 17,302 sq. ft. @ $0.006
$0.242

= $ 103.81
= $ 4,187.08
Maintenance
Administrative Fee
17,302 sq.ft. $0.242
$17,302 x $0.10
= $ 4,187.08
= $ 1,730.20

County Fee 39 lots @ $ 1.00 per lot = $ 39.00
Reserves 15% total cost of Maintenance = $ 628.06
$ 6,584.34
Estimated Cost Per Year $$ 6,584.34/39 = $ 168.83
**Lighting costs are based on 29% benefit of total cost because lights are spaced closer together resulting in 40% more lights than the city standard outside the maintenance district.

After the 2023-2024 fiscal year, the assessments shall be increased with the cost of service. The increased cost of services shall be the lesser of the actual prior year’s cost or the prior year’s estimated cost adjusted according to the annualized Consumer Price Index rate. The Consumer Price Index is based on the San Francisco Model, and any increase for the year 2023/2024 will refer back to the prior year’s CPI. In the event that the costs of services provided do not increase to exceed the full amount of CPI from one year, such excess CPI percentage shall be carried over from year to year and may be utilized to increase the amount of assessment in future years.

SECTION 6. Assessment Diagram
A copy of the proposed assessment diagram entitled “Landscape and Lighting Maintenance District No. 59 is attached to this report and by reference is made part thereof.

SECTION 7. Assessment
The initial cost of constructing improvements has been borne by the developer. The improvement areas are established for the benefit of all properties within the proposed Landscape and Lighting Maintenance District No. 59. The establishment and maintenance of the improvements is a vital part of the development of The Villas at Sierra Meadows, Phase Three Subdivision. The City Council of Porterville has determined that to ensure satisfactory levels of maintenance for the landscape and lighting at The Villas at Sierra Meadows, Phase Three Subdivision, it should become Landscape and Lighting Maintenance District No. 59. The subdivision consists of 39 Lots. The Landscape area, which benefits the 39 lots, is located along the south side of the subdivision that runs along the trail of the Poplar Ditch.

Landscape and Lighting Maintenance District No. 59 will consist of an area comprising approximately 7.15 acres. A total of 39 lots are proposed to be developed. The improvements will consist of those improvements described in Section 4 of this report. The maintenance of the improvements is a vital part of the development for the protection or safety, economic and humanistic values. The City Council has determined that, for the preservation of values incorporated within this development, all lots will receive equal benefit from the landscaping and street lighting.

The determination of benefits takes into consideration the following facts:

7. The purpose of the improvements is to provide a favorable aesthetic appearance of the area.

8. Properly maintained landscaping and lighting benefits all properties in the development.

9. The lots not adjacent to the landscaping and lighting facility improvements benefit for the maintenance equally to those lots adjacent to the improvements.

Estimated 2023-2024 Assessment
Assessment (A) = $ 6,584.34 .
39 A= $ 6,584.34 . = $ 168.83 per lot for The Villas at Sierra Meadows III 39 Total Assessment for 2023-2024 = $ 6,584.34
Total developed lot count is 39 lots.

SECTION 8. Order of Events

13. City Council adopts Resolution Instituting Proceedings, appoints an Engineer of Work and Orders Engineer’s Report.

14. City Council Adopts Resolution of Preliminary Approval of Engineer’s Report.

15. City Council Adopts Resolution of Intention to Order the Formation of Landscape and Lighting Maintenance District No. 59 and determines the district.

16. City Council adopts Resolution Ordering the Improvements and the Formation of Landscape and Lighting Maintenance District No. 59.

17. Every year between April and June the Engineer of Work file a report with the City Council.

18. Every year between April and June, the City Council conducts a public hearing and approves, or modifies the individual assessments.
________________________________
Javier Sanchez, Jr.

Engineer of the Work
RESOLUTION NO. -2023

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORTERVILLE,

COUNTY OF TULARE, STATE OF CALIFORNIA, DECLARING ITS INTENTION TO

FORM ASSESSMENT DISTRICTS AND TO LEVY AND COLLECT ASSESSMENTS IN THE LANDSCAPE AND LIGHTING MAINTENANCE ASSESSMENT DISTRICTS;

DECLARING THE WORK TO BE OF MORE LOCAL THAN ORDINARY PUBLIC BENEFIT; SPECIFYING THE EXTERIOR BOUNDARIES OF THE AREAS WITHIN

THE LANDSCAPE MAINTENANCE DISTRICTS, THE COST AND EXPENSE

THEREOF, AND THE AMOUNT EACH PARCEL THEREIN IS INITIALLY TO BE ASSESSED; DESIGNATING SAID DISTRICTS AS LANDSCAPE AND LIGHTING

MAINTENANCE DISTRICTS, DETERMINING THAT THESE PROCEEDINGS

SHALL BE TAKEN PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972; OFFERING A TIME AND PLACE FOR HEARING OBJECTIONS THERETO; WITH SAID PROCEEDINGS PERTAINING TO: THE VILLAS AT SIERRA

MEADOWS PHASE ONE, THE VILLAS AT SIERRA MEADOWS PHASE TWO AND

THE VILLAS AT SIERRA MEADOWS PHASE THREE
The City Council of the City of Porterville, pursuant to the provisions of the Landscaping and Lighting Act of 1972, being Division 15 of the Streets and Highways Code of the State of California, does resolve as follows:

SECTION 1. DESCRIPTION OF WORK
That the public interest and convenience requires it is the intention of the City Council of the City of Porterville, California, to order the following work be done, to wit:

1. Maintenance and servicing of facilities and landscaping as authorized by Section 22424 of the Streets and Highways code.

2. Any and all work and materials appurtenant thereto or which are necessary or convenient for the maintenance and servicing thereof.

SECTION 2. LOCATION OF WORK
The foregoing described work is to be located within the following areas:

1. Right-of-way, easements, and public lands within the Villas at Sierra Meadows Phase One Subdivision, more particularly described on maps which are on file in the City Clerk’s office entitled “Landscape and Lighting Maintenance District No.

57.”

2. Right-of-way, easements, and public lands within the Villas at Sierra Meadows Phase Two Subdivision, more particularly described on maps which are on file in the City Clerk’s office entitled “Landscape and Lighting Maintenance District No.

58.”

3. Right-of-way, easements, and public lands within the Villas at Sierra Meadows Phase Three Subdivision, more particularly described on maps which are on file in the City Clerk’s office entitled “Landscape and Lighting Maintenance District No. 59.”
SECTION 3. DESCRIPTION OF ASSESSMENT DISTRICT
That the contemplated work is of more local than ordinary public benefit, and the expense of said work is chargeable upon districts, which districts are to be assessed to pay the cost and expenses thereof, and said districts are described as follows:

All that certain territory of the City of Porterville, included within the exterior boundary line shown upon respective Maps of Landscape and Lighting Maintenance District numbers 57, 58, and 59, which Maps are on file in the Office of the City Clerk of said City.

SECTION 4. REPORT OF ENGINEER
The City Council of said City by Resolution has approved the reports of the Engineer of Work, which reports indicate the amount of the proposed assessment, the district boundary, detailed description of improvements, and the method of assessment. The Engineer’s Reports for Landscape and Lighting Maintenance District No. 57, 58, and 59 are on file in the Office of the City Clerk of said City, and were prepared for the 2023-2024 fiscal year in accordance with the Landscaping and Lighting Act of 1972. Reference to said reports is hereby made for all particulars for the amount and extent of the assessments and for the extent of the work.

SECTION 5. COLLECTION OF ASSESSMENTS
The assessment shall be collected at the time and in the same manner as County taxes are collected.

The Engineer of Work shall file a report annually with the City Council of said City and said Council will annually conduct a hearing upon said report at a regular meeting held between March and June, at which time assessments for the next fiscal year will be determined SECTION 6. TIME AND PLACE OF HEARING
Notice is hereby given that on the 1st day of August 2023, at the hour of 6:30 P.M. in the City Council Chambers at 291 North Main Street, in the City of Porterville, any and all persons having any objections to the work or extent of the assessment districts may appear and show cause why said work should not be done or carried out in accordance with Resolution of Intention. The City Council will consider all oral and written protests.

SECTION 7. LANDSCAPING AND LIGHTING ACT OF 1972
All the work herein proposed shall be done and carried through in pursuance of an act of the legislature of the State of California designated the Landscaping and Lighting Act of 1972, being Division 15 of the Streets and Highways Code of the State of California.

SECTION 8. PUBLICATION OF RESOLUTION OF INTENTION
Published notice shall be made pursuant to Section 6061 of the Government Code. The publication of the Notice of Hearing shall be completed at least 10 days prior to the date of hearing.

SECTION 9. CERTIFICATION
The City Clerk shall certify to the adoption of this Resolution.

APPROVED AND ADOPTED THIS 18th day of July, 2023.
_______________________________
Martha A. Flores, Mayor
ATTEST:

John Lollis, City Clerk
By: ________________________________
Patrice Hildreth, Acting Chief Deputy City Clerk

133H8 l 30 8
LUOO'BUMSAJnspueImeq'MM/vx
wmoa pUe1 Bugflaluns
A1 A1N1100 83080038 '
3A8
83080038
V39
V1111 1100
'83VW 1V 30V3 b9' 38V1111 A1N1100 '8080038 1V 3H1 18311038 30 NV|88 '8 0NV1—W11808 8013A8118 03113 SIH1 pJg AVG 30 Jrn‘nV oz’ 1:? 1V’ ‘wvoerm NI 3wmo/\ {7,1, 30 —‘t‘(0'c ha 8155 333 301% fill}; I 1N3W11000 'ON

8.83080038 1N3W31V18
1110 )18310
08' .‘c
3H1 I i! AVO; 30
3N11M' A 0NVH 0NV 1V10133 301V38 3H1 A110 30 3111A831803 81H1 N0 '3VW
83|8VON1108 30 3H1 N0181A108118 0NV 8V NMOH8 80/0NV 031V18 N0311 81H1 0NV 0N113300V 3H1 0118113 A1|1|111 81N3W38V3 11V 0301110N| N1H11M 3H1 '0N113300V 10318118 01 '81N3W3A083W1 3H1 0118113 133818 0NV 8101 V‘8 Z8 %NIAO833V 81H1 3VW 0NV '8N0181A108118 0NV N0 31VH38 30 3H1 '0118113 'Woz NV 33030 SVM A1110 CINV A18V'111938 30VW 0NV, 03331113 OlNl 3OAVOm3H1NOC113H311|A8318033OA110 76W '
81H1 8| 01 31V18 1VH1 1V V 8V111038 0N|133W 30 3H1 1110 110N000 30 3H1 m3 $.1I3anao 1N3W31v1$
A110 )18310
031V0 81H1 AV 30 i: W“ ' OZ 12 '
‘H'
3AVH N338 0311W00 'H11M
1A0833V 30 81H1 3VW A8 3H1 A110 110N000 30 3H1 A110 30 311IA831803 1V001 830NVN1080 0N|N1V1833 01 81180330 038111038 1V 3H1 3W|1 30 30 3H1 1N3WN83A00 3000 :10 3H1 31V18 30 V|N803|V10 0NV 30 ANV 83A308WOHM 11 AVW 'N830N00 1VH1 11V 8N018|A083 30 N0|8|A|0 '3 31111 A 'V1N80311V0 A8383H 31V18 01 3H1 AlN1100 '83080038 0NV 01 '1 NHOF '0 '811101 1110 )18310 30 3H1 A110 30 '3111A831803 31V18 30 A110 8.88310 1N3W31V18
330 '8V38V1 308 170 31V0
7 -¢2— 22
'1038800
03113W00 1H1|M 0NV WV11VH1 0313811V8 1VH1 81H1 3VW 8| A11V01NH031 318V01133V 1V 3H1 3W11 3O 1VA0833V :10 3H1 3A11V1N31 3VW 3/\VH N338 8313VHO Z 30 3H1 N0181A|08118 3VW 10V 0NV ANV 1V001 830NVN1080 0NV ANV 03A0833V 8N011V8311V 1VH1130383H1 11V SNO|8|A083 30 NMOH8 8| A11V11NV188118 3H1 3WV8 8V 11 038V333V N0 3H1 3A11V1N31 '3VW 1 A8383H 31V18 1VH1 | 3AVH 03N1WVX3 81H1 1VH153VW 3H1 N0181A|08118 8V A110 8.8OA3A8118 1N3W31V18
'W11 813 9008 31V0
22'1—3
1N3|0133118 01 A3A8118 01 38 '030V8138
3H1 8310V8VHO 0NV A30000 3H1 8N0111803 031V0|0N1 0NV 38V A11VNO|1|0N00 03A0833V 3A11V1N31 '3VW 31 'ANV 11V 81N3W11NOW 38V 30 81H1 10V81 3VW A11V11NV188118 8W803N00 01 3H1 03A0833V 80 NVA|11118.0 A11WV3 318VO0A38 181181 N1 H08VW 1303 1 A8383H 31V18 1VH1 N018|A108118 3VW 10V 0NV 1V001 30NVN|080 1V 3H1 18311038 30 3H1 81H1 3VW 8VM 038V3383 A8 '3W 80 830N11 AW 'N01103810 0NV 8| 038V8

8.8OA3A8118 1N3W31V18
V1 V)! 'M EH 3V”; ‘
I N0311 V 01313 A3A8118 N1 30NVW803N00 H11M 3H1 81N3W38111038 30 3H1 330 A
3A8
A1N1100 3A11V8181N1WOV 8301330 / )18310 :10 3H1 08V08 30 88081A833118 11188 ' N08V1‘ '1
a31vq SIH1 WAVG 30 "Woz .—Z—z—
1N3WN83A00 3000 30 31V18 30 'V1N803I1V0
03A0833V 3H1 8N0181A083 30VW 80:1 3H1 1N3WAV3 30 83XV1 8V 030|A083 N1 N0181A10 '3 31111 A 30 3H1 AlN1100 30 '38V1111 31V18 30 V1N803|1V0 ' 00 A8383H 31V18 1VH1 0|VS 08V08 30 8808|A833118 8VH 'l NOSVF '1 '11188 A1N1100 3A11V818|N|WOV 8301330 / )18310 30 3H1 08V08 30 8808|A833118 30 3H1 08V08 3O .88081A833118 1N3W31V18
311|A831803 0NV 1VH1 0|V8 81180338 N0 N13113 3H1 1110 0N|01|118 8.8010338N1 '301330 30NV08000V H11M 3H1 SNO|8|A083 30 30NVN1080 006 :10 3H1 1V3|0|N11W 3000 30 3H1 1110 30 | A8383H 31V18 1VH1 3H1 A8VN|W11383 81108 180338 8VM 03111W8118 A8 3W N1 H08VW 1303 NI 1108 8.833N19N3 1N3W31V18
10N 01 31vos
A1|N|0|A 3VW
MU) SN08810 3AV
1S VNV10N1
S
18 NIVW
S
(9081 [V'OAZ v9
33Ao39 'H3v3a V3 98786
9m 'M GNV8O ’3AV 313 3
wn3og 0NV1 ONIA3A811$
038113383 3A8
'3111A831803 V|N803|1V0 [9396
6131 'M N08830N3H '3/\V OV€#
3H1 NVA|11118.0 A1IWV3 318VO0A38 181181
038V3383 380:1
3N111 lZOZ
0N1N|V1N00 912 88080 1V101‘8380V 30V380V 09171
0N|18|8N00 30 68 8101 0N|N1V1N00 981 88080 '8380V [0‘9 13N 8380V 0NV V 031VNO|830 830N1VW38 N1 3H1 A110 30 '311IA831803 AlN1100 30 '38V1111 31V18 30 V1N803|1V0 183MH180N 8318V110 30 N011038 'Z 3|H8NM01 ZZ 'H11‘108 30NV8 AZ '18V3 1N110W 018V10 'NV10183W :10 '83VW 1V 30V3 '19 N1 38V1111 A1N1100 '8080038 0N138 081V V N011803 30 3H1 183MH11108 8318V110 30 3H1 0N138 V N0|S|A108118 30 3H1 830N1VW38 30 3H1 8V111A 1V V88318 8MO0V3W 38VH3 'l 8V 03080038 30 3W1110A W % asVHd z‘
3H1 SVTIIA 1v V333Is SMoavaw
10V81 3VW 'ON
HOIHM 81 30181110 30 3H1 Z‘O 1N30833 1V11NNV 30NVHO 30 '00013 'A1N1100 'VIN80311V0 031V0 3N111 '91 '6OOZ 3H1 10318118 3118 81 031V001 N1H1|M 3NOZ X 1030VH8N111 3VW 3VW) °0N 13Z1’9l010190 803 A1|N11WW00 838W11N 'ZOV09O A110 30 '311IA831803 38V1111 31V8 AON3083W3 1N3W30VNVW AON30V 1VW331 1VNO|1VN 00013 30NV8118N1 WV80083 00013 30NV8118NI 0N1MO1103 00013 3NOZ N0|1VW803N1 81 038V8 N0 8110 N0|1V1383831N1 30 3H1 1V83033 3H1 00013 08VZVH 1VNO|1VW803NI 31ON
A1|N11WW00 1N3W3013A30 80103810 ‘
No.1“ 8110N3018 3 _
t_‘fi'Tfiv . c A AVO‘ng 3o “\’ : w 03 ”293’ 031vc1 ?SIHL | A8383H 31V18 1VH1 81H1 3VW 8W803N00 01 3H1 03A0833V 3A11V1N31 3VW 031V0 A8V118833 '17 0303 ONINOZ 8.801V8181N1WCIV 1N3W31V18
NOISSIWWOD _—_—_—ff07Q?Z_—ZON
A1N1100 L130

NOISSIWWOG
l i! 9‘ 7] ;
Wigwam
031N183 33WVN 211%} 881%, W;
A8V10N 0118113
H3V80V8V3 8| ’1 3 0NV 883N11M'1038800 AW '0NVH
1 A311830 830N11 A11VN33 30 A8flf833 830N11 3H1 8MV1 30 3H1 31V18 30 V|N80311V0 1VH1 3H1 0N100803 '1N3W11818N1
1N3W11818N| 3H1 301311103333 3H1 A111N3 N0311 31VH38 30 HOIHM 3H1 '0313vaos333 c13mo3x3 3H1 3wvs N1 J&H’flila-H'ISIH 032|8OH111V A1|0V3V3 0NV 1VH1 *9 33131013147311 .18138111VNOIS NO 3H1 03313:)sans 01 3H1 N1H1|M 1N3W1181SN| 0NV 039C131MON)|0V 01 3w 1VH1 flHJJ‘SHS/HH c13mo3x3 3H1 03AO83 01 3w NO 3H1 szsvg 3o A8010V3S|1VS 30NEIGIAEI 01 33 3H1 1311103333 380HM Naww 333/31 0118113 ATIVNOS833 ’038V333V EEEQE .O W‘Wfis OHM
NO armf v ’ 330333 ’3w miama v’ A8V1ON
AlN1100 30 l: ’2 9”; 1 '88
31V18 :10 V|N803|1V0
'883N1113H11181 'AOV81100V 80 A11011VA 30 1VH1 '1N3W11000 1V1101/\|0N| OHM 03N018 3H1 1N3W11000 01 HOIHM 81H1 31V013|1830 81 '03HOV11V 0NV 10N 3H1 V A8V10N 0118113 80 83H10 8301330 0N11313W00 81H1 31V0|311830 83l3|83/\ A1N0 3H1 1111N30| 30 3H1 A8V1ON 1N3W39C131MON)|0V
W/Yé 1r 42w #51."
‘THV808 'NVA111118.0 33181181
1A8 3? y @5/
8VWO T
%
33181181'NVAI11118.0
:A8 7/5 g
3H1 NVAI11118.0 A1|WV3 318VO0A38 181181
133)1 N330 0NV 3383 W083 80N|01|118 0NV 838111011818 30 ANV ‘0N|)1 0118113.. 8311111111 ..1N3W38V3 8V NMOH8 N0 01V8 '3VW N|H1|M 0|V8 N0181A108118 H0118 831818 30 0NV1 01 38 831818 :10 0NV1 0N1A1 1N30V10V 3H101 1N083 80/0NV 3018 83N11 30 8101 1 H0008H1 68 031VN01830 8V 3M A8383H 31V0|030 803 0118113 3811 81N3W38V3 803 0118113 8311111111 '830N11 N0 80 83A0 380H1 N1V1830 3M A8383H 31V0|030 803 0118113 3811 3H1 8133818 N|H11M 3H1 A8VON1108 30 0|V8 '3VW N0|1V080038 30 0|V8 '3VW
3VW 0NV N0181A|08118 8V NMOHS N|H1|M 3H1 3A|10N118|0 A8VON1108 '83NI1 0NV A8383H 1N38N00 01 3H1 A8V88303N 01 88V3 8V310 31111 01 0|V8 A1833083 0NV 3M A8383H 1N38N00 01 3H1 0N1)1VW 30 0|V8 81H1 3VW 0NV 81N3W31V18 30VW V 18V3 '30383H1 3M 38V 3H1 A1N0 8N08833 380HM 1N38N00 8| A1833083 0301110N1 N1H1|M 3H1 N0|8|A|08118 NMOH8 N0311 81H1 '3VW 0NV 1VH1 1330X3 8V NMOHS N0 3M A8383H 31V18 3M 38V 3H1 883NMO '30 80 3AVH 3W08 '1H018 31111 80 183831N1 N1 0NV '01 3H1 1V38

8.83NMO 1N3W31V18
[N00° 38' 59"E 2659.85']
NO°38'51"E 2659.67’
1329.84'

Ev)
0‘.
o~
o: 0')
EV
0‘.
o~N
m
' ‘ $89°43‘48”E 2645.64' (1322.80') \ '
' TRACTMAPNO.
' ” THEVILLASATSIERRAMEADOWS
1 1 PHASE2
PER31-L5-38 ((N89°49'43"W 264080)) NE1/4 CORsec 2—22/27 ———_ __ _ _ __ __ $89°_49'5é"E 2640,33' PER31-LS-38 \
'1
|
* BEINGASUBDIV|S1ONOFTHEREMAINDEROFTHEVILLASATSIERRAMEADOWS PHASE1, ASRECORDEDOFVOLUME44 OFMAPS,ATPAGE61, IN TULARECOUNTYRECORDS,BEINGALSOAPORTIONOFTHESOUTHWESTQUARTEROFTHE NORTHWEST QUARTEROFSECTION2, TOWNSHIP22 SOUTH,RANGE27 EAST,MOUNTD1ABLOMERIDIAN,

IN THECITYOFPORTERVILLE,COUNTYOFTULARE,STATEOFCALIFORNIA CONSISTINGOF39 LOTSCONTAINING7.35 GROSSACRES,5.07 NETACRESANDADESIGNATEDREMAINDER CONTAINING7.15 GROSSACRES.TOTALACREAGE14.50
JUNE2021
((1334.44))
1334 53'
FD. PATCH&HUB&TACK
FD. 1/2” RBRCAPLS4076 WITH2X2O/S PER44 MB53 ,
N03° 30'22"W 038' OF

CORNERNOTACCEPTED
((N89°43'50"W 264560)) . [589°43'50"E 2645.60') ((1322.80))

BASISOFBEARINGS
THEEASTLINEOFTHENORTHWEST QUARTEROFSECTION2, TOWNSHIP22 SOUTH,RANGE27 EAST,MOUNTDIABLO MERIDIAN,TAKENASN0°26'30"E ASSHOWNONRECORDOFSURVEYMAPRECORDED1N BOOK31 OFLICENSED

SURVEYSATPAGE38, TULARECOUNTYRECORDS.
322.82

\ 1322.82' BROWNmm 9,05-40' 417.42' (417.42')
FD. 2x2 0/5 IN LIEU OF (1322.80) (905.38‘)
. flmggummPER ((1322.79))
\ SOO°26'30"W 208.71' 1 |
’(N00°26'30"w 208.71') | LEGEND
- I — _ RICHARDAVENUE'— — I
8-—- 3g . FOUNDANDACCEPTEDMONUMENTS ASDESCRIBED
oo' 3..
3 E E? 0 SETCITYSTANDARDMONUMENT STAMPEDLS 8006
=_ 1 ’6 "
g 1 E ‘9 kN89°27'40"W 56.00‘ 8 FOUND1/2" REBARTAGGEDPLS4076 PERBOOK44 OFMAPSATPAGE g a ' - ., (N89° 33' 30"w 56.00‘) ' 61 OFFICIALRECORDS
Z < N89°43'46"w 340.00' 0 '. .. ' .
'
"g“ l ,, (5896431211E 340 00.)“ 2| \500 36 2,6 W, 5756 , 1 ( ) RECORDATAPERMAPTHEV1LLASATSIERRAMEADOWS PHASE1 , ” 1 | .1 g); (”00 26 30 E 57-461 RECORDEDIN BOOK44 OFo1= MAPSATPAGE61 OFFICIALRECORDS [1.1
I ll 1 ma
I'—
». 500°1608 W161-00, $13 _ (1}, RECORDATAPERMAPRECORDEDIN VOLUME31 OFLICENSED _——
3mAVENUE (”00°16'11'E 161-001 98 9; (( )) SURVEYSATPAGE38 T.C.R. .1—
0~ ~o
U")
. /
a 3 [ 1 RECORDATAPERMAPRECORDEDIN VOLUME44 OFMAPSA1PAGE N89°27'16"W \/ / / \ \ \ \ N89°43'49"W / //
'1“ 1a 53 TULARECOUNTYRECORDS
/ / ‘ . “ / 8 u:
.2 a 103-87 // 1 / \\\ 33063 // "a (3 ON 1 § UNRECORDEDJAYESTREETPROPERTYSURVEYPLATPREPAREDBYTHE S
6 a. a
, 1 / \34703m9-vw 27.541 // {Effigy 15 8 CITYOFPORTERVILLEDATED9/15/2018 N00°32'44"E 26.90'
_ _ a m \/ 589°4349
. .. E 15.371 I ( W4
13“ Z Z.

E Q ~
" \N89°45'23”W (N89°43'49“W 1 5 37-)“ s; Q4 1 1 LINEINDICATESSUBDIVISIONBOUNDARY <8 6‘ 5” ‘=“ 56.02' ' “2
a g 3, 5% g 15' WIDEPEDESTRIANACCESSEASEMENT.‘
o o . R RADIAL
g8 v§ 352 1 ILL 1115011315
0V)
|
NOTE:SET3/4" LP. w111-1 CAPLS 8006 ATALL101 CORNERS
2,3
ANDBEGINNINGANDENDING01 CURVES
'8 13-. 2 L .
‘ (‘7.
gr 'V. Vt
3%a '3
g 3,- :- 3
L;
= :
9 g
a< a
,_
3‘» .—
<2 UNPLOTTABLEEASEMENTSOFRECORD
5 :1 N g g g gl
a:
0')
51 co <10
Ex) LL0
0")
_ .m 5°<2 I 1. EASEMENT1o POPLARIRRIGAUONCOMPANY, ACORPORANON, FORWATERDITCHPURPOSESRECORDEDAPRIL13, 1900 PER 5’: °o "0 558°07'55'W 49-97' LS46°39'54”W 204.30' 9 8 a g BOOK97, PAGES261-264 OFDEEDS.

NOTTo SCALE
£3. 2
{N58°07'49"E
1N58°07'49"E

49.97')
49-97'1‘\ \ / ’
{S46P40'09"W
(S46°40'O9"W 204.30}
204.30') 3 0% ‘2 z ’
: T 2. EASEMENT10 M1. WHITNEYPOWERANDELECTRICCOMPANYFORPUBLICUTILITIES RECORDEDAUGUST1, 1913 PERBOOK31, PAGE 256 OFCONTRACTS.

POPLARDITCH~\ 1

3. EASEMENT10 SOUTHERNCALIFORNIAEDISONCOMPANYFORPUBLIC011111153 RECORDEDMARCH4, 1953 ASDOCUMENT NO.6978 1 OFOFFICIALRECORDS. ‘ _ _ __ (561°01'07'W 220.50' 1
(N61°01'01"E 220.50‘)
{N61°O1‘01"E 220.50'}
1 E 1/4 CORSEC3-1223 L351°18'15"W 223-7"
I R27EFD. BRASSTAG& ’ ’ ’— 1N51°‘7'06"E 223-761
NAIL, TAGILL. ,
’ {N51°17'06"E 223.76'} ‘ FD. 2" BRASSCAPIN MON 1 PER31 -RS—38 [1325.221 WELL£63212 OFSECTION 1 ((1325.22))
. 2-122 CITYBM#95
(1325.22)
((1325.22)) PER44-MB—61
\ (1325.22)
132522 N I 132522 . \. _I
N89°50‘15"W 2650.44' _/‘
(N89°50' 1 5"W 2650.44“)
((N89°50'15"W 2650.44'))
' [N89°50'15"W 2650.44‘]
BorumLand Surveying
www.borumlandsurveying.com
SHEET2 OF3

TRACTMAPNO.

THEVILLASATSIERRAMEADOWS .:

PHASE2

BEINGASUBDIVISIONOFTHEREMAINDEROFTHEVILLASATSIERRAMEADOWS PHASE1, As RECORDEDOFVOLUME44 LE_G_EB_D_ OFMAPS,ATPAGE61, IN TULARECOUNTYRECORDS,BEINGALSOAPORTIONOFTHESOUTHWESTQUARTEROFTHE NORTHWEST QUARTEROFSECTION2, TOWNSHIP22 SOUTH,RANGE27 EAST,MOUNTDIABLOMERIDIAN, . FOUNDANDACCEPTEDMONUMENTS ASDESCRIBED SCALE,1,: 50. , , 1N THECITYOFPORTERVILLE,COUNTYOFTULARE,STATEOFCALIFORNIA - . . 0 SETCITYSTANDARDMONUMENTSTAMPEDL5 8006
0' 50 100
E
CONSISTINGOF39 LOTSCONTAiNING7.35 GROSSACRES,5.07 NETACRESANDADESIGNATEDREMAINDER CONTAINING7.15 GROSSACRES.TOTALACREAGE14.50 8 FOUND1/2" REBARTAGGEDPLS4076 PERBOOK44 OFMAPSATPAGE JUNE2021 61 OFFICIALRECORDS
RECORDATAPERMAPTHEVILLASATSIERRAMEADOWS PHASE1
FD. 1 /2" 121312 CAP234076
( ) RECORDEDIN BOOK44 OFOFMAPSATPAGE61 OFFICIALRECORDS
N036302251315038 10' WATERLINEBASEMENTTOTHECITY
NOTACC OFPORTERVILLEBK4146, PG. 387 0.13.

RECORDATAPERMAPRECORDED1N VOLUME31 op LICENSED
(389043150-IE 905381) ,
(( "' )) SURVEYSATPAGE38 TCR.
.’ S89°43'48"E 905.40' , \-
' . ‘ . RECORDATAPERMAPRECORDEDIN VOLUME44 (3F MAPSATPAGE '\ 131.88' "-
53 TULARECOUNTYRECORDS
BRDWNAVENUE3

u.

CiTYOFPORTERVILLEDATED9/15/2018

{ ; UNRECORDEDJAYESTREETPROPERTYSURVEYPLATPREPAREDBYTHE “%
/

__ __ _ _ __ _ 23
I 8. $ .
., 589°43'48”E 83.78' ~. 3
3 8
_ g3) . .3 . LOT1 m- LINElNDlCATESSUBDIVISIONBOUNDARY

5., L595; 51,3 LOT2 53 6‘64S‘F‘ 3. 15' WIDEPEDESTR|ANACCESSEASEMENT :- .. 4987 S.F. °o V
. ‘0
u).
\ g
. 3 R RADIAL
LOT39 w ILL ILLEGIBLE

7095 S.F. 28'
6' PUE(TY?) :— :K
. _. _ ._
l g E. NOTE:5513/4" |.P.WITH CAPLS 8006 ATALLLOTCORNERS 6' PUE(TYP) 50-00 5000 50-00' —50.00" g g ANDBEGINNINGANDENDINGOFCURVES 7] $89°43‘47"E 604.80‘ ,- 3.1.. Lu
N89°2 ' 6"W 103.88

5.2, :9)
:0, -
_____
N89°43'47"w 745.76‘ \, R7 g :3
LT38 _—___‘__—’_———'—_————*——“—”——-—— 29
9286 s.1=. 60 RI [3 HARD AVENUE - I' FD. 3/4" |.P. TAGGED ~ 1. . 2 12558236236111?“ , RADIALLINETABLE
50 00 589°43'47"E 3‘45; ~- 3 -’ S89°43'47"E 320.25' “CITYSETAEIEARD , .'_._.__5.' " BRA 01
10337
I RADIAL# BEARING
I ‘V- ' N. . FD.1/2"RBRCAP . ..

LOT37 § :2 I b _ LS4076 N02°59'50"E “ N62007 49 E
5286 3.2. to v 0. g 043' OFCORNER
.‘r O b
'— Ox
N * O. 1.“
' . . ,,
l 5 3| 1 L313? 1813.9 3 1,213.5 50.13: ' ~89° 27 16 w _ °— 3 '2 = N89°27'40"W 56.00' . .. LOT36 9° :3 E I ‘2 g 23 (N89° 33' 30"w 56.00‘) 30° 16 ‘3 W . to 5286 S.F. «O: (‘93 _ g I 338° 28' 07"E
3 54 l 8 - N00°26'26"E 57.56‘
:3 < 9
\ (N00°26'30"E 57.46') “ N24° 13. 18"W
N '—
.
103.87' 2,2 [j l 20 389°43'46"E 340 00' ,-
3 <1: I 3
(589° 43' 49"E 340200)
889° 43- 47"E

1.2185 m 1 82°?-
N “J - E3 l
O _'-U
303 87. Z I E LOT31 g? E
'
' 567OS.F.
" :23
L” E
1 1 ‘2"?
L9813F4 . \
,. -
E g
5 . . 65 28. | 28. ' ”UE‘TYP, ml 1- LINE# LENGTH DIRECTION I 3 m --
L] 28.35 544° 35' 32"E
' 589°43‘47"E 315.41‘ ' ’
,~ . 3, ' FD.3/4"|.P.TAGGED
l 5° ‘ .5 ii , ; ,
" 4 ' L58006 PER44—MB—61 14.73 80° 32' 44"W
;, I N l J CI AN‘AVENUE ’ :~ 33; ‘ N REPLACEDWITHCITY
<2 _———— ——N————-- ~?—————__2 STANDARDBRASSDISC 2835 544° 35. 31.15 ,\ o — — -- —-—-—— —————— — — —- —_—-—————-————'—" "'
. 5 ~ 3 § N89°43'47"W 378.64‘ 3» ,1 ,
3 I °<3 . .3) , 2: ,3:: . ~
, 3:! g

28.22 N45° 24' 29"E
:7 -\ N89°27'16"W 103.87' ,-
" ) l 3 ..
09‘; -~ 889°43'49" 30.63‘ - ,.
2835 N44035 3‘ W
9, , 1: .
o . .. .

N0°32'44"E 26.90' 28 . 28 N47°30‘19"E 27 54- C/L 10' WIDESANITARYSEWER $89 43 49 E 15'37 389° 43' 47"E
‘ EASEMENT10 THECITYOF 30632.43..w 394.35. ‘
PORTERVILLEPER44-MB-61 544° 38' 38"E
l
58' °45'23"E 6.02'

BASISOFBEARINGS
THEEASTLINEOFTHENORTHWEST QUARTEROFSECTION2, TOWNSHIP22 SOUTH,RANGE27 EAST,MOUNTDIABLO

MERIDIAN,TAKENASN0°26'30"E ASSHOWNONRECORDOFSURVEYMAPRECORDEDIN BOOK3] OFLICENSED SURVEYSATPAGE38, TULARECOUNTYRECORDS.

BorumLand Surveying
www.borumlandsurVeyingcom
SHEET3 OF3

JOAN AVENUE MESA OAK STREET
N89°43'49"W
330.63'
N89°45'23"W

56.02'
N89°27'16"W
103.87'
LOT 33
N00°32'44"E 26.90'
N0°32'43"E 394.35'
S89°43'49"E 15.37'
(N89°43'49"W 15.37')
S46°39'54"W 204.30'
(S46°40'09"W 204.30')
S58°07'55"W 49.97'
(N58°07'49"E 49.97')
S61°01'07"W 220.50'
(N61°01'01"E 220.50')
S51°18'15"W 223.71'
(N51°17'06"E 223.76')
346.02'

POPLAR DITCH SOUTH HOWLAND COURT
FD. BD
STAMPED LS 8006

42.10'
5,276 SQ.FT.
1 5,286 SQ.FT.
2 5,286 SQ.FT.
3 5,286 SQ.FT.
4 5,286 SQ.FT.
5 5,286 SQ.FT.
6 5,286 SQ.FT.
7 5,286 SQ.FT.
8 5,286 SQ.FT.
9 5,286 SQ.FT.
10 7,070 SQ.FT.
11 14,293 SQ.FT.
12 8,046 SQ.FT.
13 5,395 SQ.FT.
14 5,395 SQ.FT.
15 5,395 SQ.FT.
16 5,395 SQ.FT.
17 5,395 SQ.FT.
18 5,395 SQ.FT.
19 5,395 SQ.FT.
20 5,395 SQ.FT.
21 5,395 SQ.FT.
22 7,095 SQ.FT.
23 7,149 SQ.FT.
24 5,405 SQ.FT.
25 5,405 SQ.FT.
26 5,405 SQ.FT.
27 5,405 SQ.FT.
28 5,405 SQ.FT.
29 5,403 SQ.FT.
30 8,095 SQ.FT.
31 11,242 SQ.FT.
32 8,167 SQ.FT.
33 5,681 SQ.FT.
34 5,681 SQ.FT.
35 5,681 SQ.FT.
36 5,681 SQ.FT.
37 5,681 SQ.FT.
38 6,956 SQ.FT.
39 50.79' 50.89' 50.89' 50.89' 50.89' 50.89' 50.89' 50.89' 50.89' 50.89' 50.89' 50.89' 50.89' 50.89' 50.89' 50.89' 50.89' 50.89' 50.89' 50.00' 70.00'

83.86'
N89°27'16"W 103.86'
103.86'
103.86'
103.87'
103.87'
103.87'
103.87'
103.87'
103.87'
103.87'
N45°32'44"E 28.28'

74.91'
N0°32'43"E (R)
N62°55'29"E (R)
N89°27'16"W (R)
N89°27'16"W (R)
N79°03'45"W (R)
N50°42'50"W (R)
N51°48'23"E (R)
N89°27'16"W (R)
N89°27'17"W 131.85'
N44°26'15"W 15.00' 51.89' 51.89' 51.89' 51.89' 51.89' 51.89' 51.89' 51.89' 51.89' 51.10' N0°32'44"E 591.39' 70.30' 51.89' 51.89' 51.89' 51.89' 51.89' 51.89' 51.89' 51.89' 51.89' 54.09' N89°27'16"W 103.98'
N89°27'16"W 103.98' N67°34'16"E (R) 93.56'
N89°27'16"W 103.98'
N89°27'16"W 207.33'
N89°27'16"W 208.15'
N89°27'16"W 208.15'
N89°27'16"W 208.15'
N89°27'16"W 208.15'
N89°27'16"W 208.15'
N89°27'16"W 208.15'
N89°27'16"W 102.00'
N89°27'16"W 101.99'
102.00'
102.00'
101.99'
101.99' 55.70' 24.97' 55.70' 55.70' 55.70' 55.70' 49.92'70.41' 55.70' 55.70' 55.70' 55.70' 55.70' 45.44' 42.87' 51.89' 51.89' 51.89' 51.89' 51.89' 50.80'

15.37'
N43°37'31"W (R) 9.77'
N44°35'32"W 28.22' N45°24'28"E 28.35' N47°30'19"E 27.54' N43°25'39"W (R)

24.90'
N28°09'29"E (R)
(N58°07'49"E 49.97')
[N00°32'41"E 791.61'] BASIS OF BEARINGS

WATER OAK
AVENUE
25'
25'
25'
5/23/23

AS NOTED
RER
---
JESSE ALLEN WILLIAMS R.C.E. 64742
DATE
DATE

THE VILLAS AT SIERRA

MEADOWS PHASE THREE
SMEE HOMES INC.

LANDSCAPE & LIGHTING

MAINTENANCE DISTRICT
22059
1 \\Fileserver\g\AWE\2022\22059 - Villas at Sierra Meadows Ph. 3 - Smee Homes\DWG\22059 LLMD 1.dwg - AWENGINEERING X

CIVIL ENGINEERS & LAND SURVEYORS
810 W ACEQUIA AVENUE, VISALIA CA 93291
559-713-6139
AWEngineering SCALE:

DATE:

DRAWN BY:

CHECKED BY:

NO. REVISION INIT DATE APPROVED BY:

APPROVED BY:

FOR:

PROJECT:

SHEET TITLE:

JOB NUMBER
SHEET

FLOOD ZONE
LEGEND
N

VICINITY MAP NTS

CITY OF PORTERVILLE
POPLAR DITCH S. JAYE ST. S. INDIANA ST.

BROWN AVE. S. MAIN ST.

S. H ST.

SUBJECT

PROPERTY

COUNTY OF TULARE

PORTERVILLE, CA
444 N. PROSPECT ST. SUITE A
PORTERVILLE, CA. 93257
N
STREET LIGHTS: 7
LANDSCAPE AREA:17,302 S.F.

CONCRETE BLOCK
RETAINING WALL: 619 Ft.

TRAIL DETAIL N.T.S.

Item No. 15.

CITY COUNCIL AGENDA – JULY 18, 2023
SUBJECT: Assignment of Airport Lease - Lot No. 40
SOURCE: Finance
COMMENT: Dana Gillespie and Susan Peck are the current leaseholders of Lot No. 40 at the Porterville Municipal Airport. Dana Gillespie and Susan Peck have sold their hangar located on the lot and are requesting the transfer of the lease to the new owner, Matthew A. Quatacker. Quatacker is requesting City Council authorization to assume the existing lease agreement between the City and Gillespie and Peck. The original lease agreement terminates on December 31, 2026. The hangar will be utilized for the parking and storage of aircraft.

RECOMMENDATION: That the City Council:

1. Approve the Assignment of Lease for Lot No. 40 at the Porterville Municipal Airport from Dana Gillespie and Susan Peck to Matthew A. Quatacker; and

2. Authorize the Mayor to sign the Lessor's Consent to
Assignment of Lease Agreement on behalf of the City.

ATTACHMENTS: 1. Draft Assignment of Lease

2. Draft Lessor's Consent to Assignment of Lease Agreement

3. Letters of Request dated June 30, 2023

4. Bill of Sale

5. Locator Map
Appropriated/Funded:

Review By:

Department Director:

Maria Bemis, Finance Director
Final Approver: John Lollis, City Manager

ASSIGNMENT OF LEASE

PORTERVILLE MUNICIPAL AIRPORT
THIS AGREEMENT, made this 18th day ofJuly, 2023, by and between Dana Gillespie and Susan Peck, P. O. Box 190, Deer Harbor, WA, owner of a hangar on Lot 40 at the Porterville Municipal Airport, as the Assignor, and Matthew A. Quatacker, 17736 Ave 168, Porterville, CA, as the Assignee.

In consideration of the mutual covenants herein contained, each act to be performed hereunder, and for other valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows:

1. Effective July 1, 2023, Assignor hereby assigns, transfers and conveys to Assignee all of his right, title and interest as Lessee, in, to and under a certain Lease Agreement dated January 1, 2017 (hereinafter "Lease"), executed by and between the City of Porterville, as Lessor, and Dana Gillespie and Susan Peck, as the original Lessees, providing for the letting of certain premises located at the Porterville Municipal Airport, Porterville, California, being more particularly described as follows:

Airport land Lot No. 40, containing a total area of approximately 4,200 square feet, and establishing a Lease terminating on December 31, 2026.

2. Effective July 1, 2023, Assignee hereby accepts and assumes all of the obligations, responsibilities and liabilities of Assignor under said Lease, and agrees to perform said Lease Agreement according to its terms, covenants and conditions, without exception, and Assignee understands and agrees that Landlord makes no warranty or representation that either Assignor or Assignee would be given an exclusive use in the Porterville Municipal Airport for the use thereof by Assignor and/or Assignee, except as provided in the Lease.

3. Upon execution of this Assignment of Lease and Landlord's consent hereto, the parties’ Noticed Address shall be as set forth herein above. The parties further understand there is a $150 assignment fee, payable to the City of Porterville, and the Assignee must provide proof of aircraft and hangar owner’s liability insurance within thirty (30) days of Council approval.

4. Assignor hereby covenants said Lease as valid and existing and hereby warrant that Assignor is not in default as of the date of this Assignment.

5. This Assignment shall be binding upon and shall inure to the benefit of the respective parties, their successors and assigns.

IN WITNESS WHEREOF, the parties hereto have executed this Assignment of Lease as of the date first above written.

ASSIGNOR: ASSIGNEE:

Dana Gillespie Matthew A. Quatacker
BY: BY:

Susan Peck
BY:

LESSOR'S CONSENT TO ASSIGNMENT OF LEASE AGREEMENT

PORTERVILLE MUNICIPAL AIRPORT
AIRPORT HANGAR LOT NO. 40
The City of Porterville, a municipal corporation of the State of California, being the Landlord under the Lease for Airport Hangar Lot No. 40, described in the foregoing Assignment, hereby consents to the foregoing Assignment of Lease Agreement from Dana Gillespie and Susan Peck to Matthew A. Quatacker, terminating December 31, 2026, for the parking and storage of aircraft, upon the expressed condition that there shall be no further assignment without the prior written consent of the Landlord.

Dated this 18th day of July, 2023.

CITY OF PORTERVILLE
BY: _______________________________
Martha A. Flores

MAYOR, CITY OF PORTERVILLE
"LESSOR"
ATTEST: _______________________________
John D. Lollis, CITY CLERK
APPROVED AS TO FORM:

BY: _________________________
Julia Lew, City Attorney

Item No. 16.

CITY COUNCIL AGENDA – JULY 18, 2023
SUBJECT: Approval of Community Civic Event - Porterville Kiwanis Club - Vendor Market - July 22, 2023
SOURCE: Finance
COMMENT: The Porterville Kiwanis Club is requesting approval to hold the Porterville Kiwanis Club Vendor Market on Saturday, July 22, 2023 at Veterans Park, from 10:00 AM to 7:00 PM. This is a fundraising event for the Club and will feature several merchant vendor booths and also some informational booths.

This request is made under the Community Civic Events Ordinance No. 1326, as amended. The application has been routed according to the Ordinance regulations and reviewed by all City Departments involved. All requirements and restrictions are listed on the attached copy of the Application and Agreement, Exhibit A, Exhibit B, and Exhibit C.

RECOMMENDATION: That the City Council approve the Community Civic Event application from Porterville Kiwanis Club to hold the Vendor Market on July 22, 2023, subject to the requirements and restrictions contained in the Application and Agreement, Exhibit A, Exhibit B, and Exhibit C.

ATTACHMENTS: 1. CCE Application and Agreement, Exhibit A, Exhibit B, Exhibit C, Outside Amplifier Permit, and Certificate of Liability Insurance
Appropriated/Funded:

Review By:

Department Director:

Maria Bemis, Finance Director
Final Approver: John Lollis, City Manager

Item No. 17.

CITY COUNCIL AGENDA – JULY 18, 2023
SUBJECT: Approval of Community Civic Event - American Conservatory - The Mecca Grand Re-opening - August 5, 2023
SOURCE: Finance
COMMENT: The American Conservatory is requesting approval to hold "The Mecca Grand Re-opening" on Saturday, August 5, 2023, from 5:00 PM to 2:00 AM.

American Conservatory is requesting the use of the alley and the parking lots behind the Mecca and the adjacent buildings to the south of the Mecca off of Second Street. The event will feature live music and a beer garden. An outside amplifier permit has been approved from 5:00 PM to 10:00 PM. A 6-foot chain link fence will be required to enclose the entire outside event area to allow for the consumption of alcohol.

This request is made under the Community Civic Events Ordinance No. 1326, as amended. The application has been routed according to the Ordinance regulations and reviewed by all City Departments involved. All requirements and restrictions are listed on the attached copy of the Application and Agreement, Exhibit A, Exhibit B, and Exhibit C.

RECOMMENDATION: That the City Council approve the Community Civic Event application from American Conservatory to hold "The Mecca Grand Re-opening" on August 5, 2023, subject to the
requirements and restrictions contained in the Application and Agreement, Exhibit A, Exhibit B, and Exhibit C.

ATTACHMENTS: 1. CCE Application and Agreement, Map, Exhibit A, Exhibit B, Exhibit C, and Outside Amplifier Permit
Appropriated/Funded:

Review By:

Department Director:

Maria Bemis, Finance Director
Final Approver: John Lollis, City Manager

Item No. 18.

CITY COUNCIL AGENDA – JULY 18, 2023
SUBJECT: Authorization of Street Closures for the National Night Out and KJUG Free Summer Concert Community Event on August 1, 2023
SOURCE: Parks and Leisure Services
COMMENT: At its meeting on June 20, 2023, the City Council authorized the scheduling of National Night Out and the KJUG Free Summer Concert to take place at Centennial Park and the surrounding streets on August 1, 2023. The planned concert performer is Drake Milligan, an actor and singer who appeared on American Idol and America's Got Talent and has songs on the Billboard country music charts. In support of the approval of the City's community civic event, the Council also authorized the scheduling of its regular meeting to begin at 3:00 PM.

National Night Out includes many booths that will encompass multiple blocks on Main Street in the vicinity of Centennial Park and City Hall. In order to accommodate the booths, City staff is recommending the closure of Main Street from Morton Avenue to Putnam Avenue and adjacent side streets to the alleys from 3:00 P.M. to 10:00 P.M. on August 1, 2023.

RECOMMENDATION: That the City Council authorize the closure of streets for the National Night Out and KJUG Free Summer Concert community event on August 1, 2023.

ATTACHMENTS: 1. Traffic Control Diagram
Appropriated/Funded:

Review By:

Department Director:

Donnie Moore, Parks and Leisure Services Director
Final Approver: John Lollis, City Manager

Page 1 of 1 ends

Item No. 19.

CITY COUNCIL AGENDA – JULY 18, 2023
SUBJECT: Status and Review of Local Drought Emergency
SOURCE: City Manager's Office
COMMENT:

At its meeting of May 5, 2015, the City Council took action to approve a Resolution Declaring a Drought Emergency in the City of Porterville. At its meeting of June 20, 2023, the Council reviewed the status of existence of local emergency, and acted to continue its Resolution of local emergency.

Governor Brown issued Executive Order B-29-15 on Wednesday, April 1, 2015, which established drought-related mandates and restrictions in addition to those already stipulated in previous Executive Orders B-26-14 and B-28-14. Of significance, the Governor directed the State Water Resources Control Board to impose restrictions to achieve a statewide twenty-five percent (25%) reduction in potable urban water usage through February 28, 2016, in comparison to the amount used in 2013, and with consideration given to per capita usage as a basis. The Governor further directed the Board to impose additional restrictions on commercial, industrial, and institutional properties with significant landscaping (cemeteries, golf courses, parks, schools, etc.), to also achieve a twenty-five (25%) reduction in potable water usage. Also of significance, the Board was directed to prohibit irrigation with potable water outside of newly constructed homes and buildings that is not delivered by drip or micro-spray systems.

On November 13, 2015, Governor Brown issued Executive Order B-36-15, which extends emergency conservation regulations through October 2016, if drought conditions persist through January 2016. On February 2, 2016, the State Water Resources Control Board adopted extended emergency water conservation regulations, to be in effect March 1 through October 31, 2016.

The City of Porterville benefited somewhat from the extended regulations as the City's water conservation rate has been reduced from thirty-two percent (32%) to twenty-six percent (26%), due to new water connections that have been made and population served (4%), as well as a new climate adjustment factor that was considered (2%).

On May 9, 2016, Governor Brown issued Executive Order B-37-16 ("Making Water Conservation a California Way of Life"), which directs the State Water Resources Control Board to establish new regulations making permanent the emergency conservation regulations. On May 18, 2016, the State Water Resources Control Board adopted a statewide water conservation approach that replaces the percentage reduction-based water conservation standard with a Item No. 19.
localized "stress test" approach that mandates urban water suppliers act immediately to ensure at least a three-year supply of water to their customers under continued drought conditions.

On April 7, 2017, Governor Brown issued Executive Order B-40-17, which ended the drought state of emergency in most of California, with the exception of Fresno, Kings, Tulare and Tuolumne counties where emergency water supply and reliability projects are continuing toward addressing diminishing groundwater supplies. The Order maintains monthly reporting requirements and prohibitions on wasteful practices.

On May 31, 2018, Governor Brown signed both AB 1668 (Friedman) and SB 606 (Hertzberg), which set permanent overall targets for indoor and outdoor water consumption. The legislation sets an initial limit for indoor water use of fifty-five (55) gallons per-person per-day in 2022, reducing to 52.5 gallons perperson per-day in 2025, and finally to fifty (50) gallons per-person per-day in 2030. The amount of residential outdoor use is yet-to-be determined, but will allow for varying regional climates. In addition, a standard for water loss due to leak rates in water system pipes will be established. As an urban water provider, the City will need to submit its plan for compliance for approval by the State Water Resources Control Board.

On March 5, 2021, Secretary Vilsack of the United States Department of Agriculture federally-designated Tulare County as a primary natural disaster area due to ongoing drought conditions. On April 21, 2021, Governor Newsom issued a State of Emergency Proclamation due to drought conditions, including Tulare County. On April 27, 2021, the Tulare County Board of Supervisors adopted a Resolution Proclaiming a Local Emergency due to severe drought conditions. On January 4, 2022, the State Water Resources Control Board adopted emergency regulations to supplement voluntary water conservation.

On March 28, 2022, Governor Newsom issued Executive Order N-7-22, that requires the state's largest water providers (including the City of Porterville) to put in place "Level 2" of water shortage contingency plans, which the City is currently in "Level 4." On June 10, 2022, the State Water Resources Control Board adopted emergency regulations to prohibit the watering of nonfunctional or purely decorative grass in commercial, industrial or institutional properties with potable water. On March 24, 2023, due to atmospheric river storms during the month of March 2023, Governor Newsom issued Executive Order N-5-23 that ended the requirement that the state's largest water providers (including the City of Porterville) put in place "Level 2" of water storage contingency plans (the City of Porterville is currently in "Level 4"), as well as ended the voluntary fifteen percent (15%) water conservation target.

At its meeting on January 17, 2023, the Council considered an emergency request from the County of Tulare for assistance to Self-Help Enterprises, Inc. (SHE) in the provision of source water for the Emergency Tank Program that serves 389 residences across Tulare County where domestic wells have run dry due to continued drought. The County had been providing source water from its well at the Bob Wiley Detention Facility, north of Visalia, but the recent Item No. 19.
rainfall had caused damage and the temporary closure of the access road to the well. The Council acted to grant the County's request for emergency assistance and provide source water to SHE to continue the Emergency Tank Program, to be reviewed at its next regular meeting on February 7, 2023. On January 20, 2023, SHE began taking City water for delivery. The County later reported that the access road had been repaired and that the County source well was accessible again to SHE beginning on February 1, 2023. According to the City water meter report, approximately 111,500 gallons of water was accessed by SHE, with a corresponding cost of $350. At Council's direction, City staff has also been in contact and coordinating with the Eastern Tule Groundwater Sustainability Agency (ETGSA) in regard to source water from the ETGSA crossing over into other GSA territories and other Sub-basins (e.g. Kaweah) and addressing any potential impacts, although it is important to note that the same has been happening from the County well that is located in the Kaweah Subbasin.

Initially within the city of Porterville, twenty-six (26) residences within the city were determined to have dry wells, for which City staff submitted a Mutual Aid Request to Tulare County OES to initiate the household tank program for identified properties within the city where wells are dry and challenged for permanent connection. The State has committed funding for non-profit agencies to continue drought-related activities, which Self-Help Enterprises has continued the household tank program locally, through State Cleanup and Abatement Account (CAA) emergency funds.

Representatives for the City, County, State (CalOES, DDW, DWR, and SWB) and non-profit partners continued to meet in support of the long-term permanent water connection project for the entire East Porterville area and the estimated 1,800 expected future connections. DWR identified 423 residential units in the East Porterville area (381 of which are in the City's Urban Development Boundary), that were served by the County's Household Tank Program and desired by the State to be connected to the City's water distribution system as soon as possible. DWR has completed a significant City waterline extension project to permanently connect those 423 residential units to the City's water system (considered Phase I of the project). To provide initial source water for the DWR extension project, CalOES desired to expeditiously connect the new well on Olive Avenue to the City's water system instead of being first equipped as a filling station. Given the new well has an estimated water production value of 800 gallons per minute, as well as a SWB assumed 1.5 gallons per minute per residence, the new well could effectively serve up to five hundred (500) single-family residential units. The City indicated its significant interest that the E. Vandalia Avenue area and its eighty (80) residential units be included in the water connection project, to which the State was agreeable.

Given CalOES has paid for the development of the new well, and its connection to the City's water system, the City will be required under "Drought Redundancy and Resiliency Provisions" to make available to the State up to three million gallons of water per month without charge for emergency Item No. 19.
purposes. On May 7, 2022, Tulare County OES notified the City that due to deteriorating conditions across the county involving small water systems dependent upon the Friant-Kern Canal that may result in the complete lack of water or "Do Not Drink" orders, the State and County may have to invoke the provision of water from the well.

To proceed with the connection of the new well to the City's water system and the 500 East Porterville and E. Vandalia Avenue residential units, the City Council approved modifications to the Draft Agreement between the City and County at its meeting on April 5, 2016, which the County Board of Supervisors subsequently approved at their meeting on May 10, 2016.

A Memorandum of Understanding between the State, County, and City on the East Porterville permanent water connection project was approved by the Council during a Special Meeting on Tuesday, June 21, 2016, and approved by the Board of Supervisors on Tuesday, June 28, 2016. With the approval of the MOU, the State began the permanent connection of approximately forty (40) homes that are located along existing City water mains. Subsequently, the State officially requested that the City approve the connection of an additional thirty (30) residences as part of the first immediate connections, for up to a total of seventy (70), which the Council approved at its meeting on August 2, 2016.

In regards to the new well's development and connection to the City's water distribution system, the Board of Supervisors awarded the contract for equipping and connecting the new well at its meeting on Tuesday, August 16, 2016, and construction activities commenced the week of October 10, 2016.

County staff had previously indicated that the well would be in service and connected to the City's system no later than December 2016, however, the well was operational and connected to the City's water distribution as of Friday, February 17, 2017. Given the delay in the well's completion and connection, DWR requested that the Council consider allowing the connection of residences as they become prepared for connection, to which the Council was receptive, and a Draft MOU Amendment was approved by the Council at its meeting on December 6, 2016, and subsequently approved by the Board of Supervisors at is meeting on December 20, 2016. City staff continued to work with County staff toward the transfer of the well's ownership from the County to the City, which at its meeting on April 20, 2021, the Council approved the draft Transfer Agreement subject to the City Attorney's final form.

As of Friday, March 31, 2017, the date the State established as the final day for property owners to complete the registration process to participate in the Statefunded connection program opportunity, of the 1,017 eligible developed residential properties identified by the State for connection, 722 completed the required Extra-Territorial Services Agreement, leaving 295 developed residential properties non-responsive to this unique connection program, twenty-three (23) of which were reported as having either dry or diminishing capacity wells. On February 6, 2018, the final residential connection was made of the approximate eligible eight hundred (800) residences in East Porterville to the City's water system.

Item No. 19.

City staff continues to coordinate with Self-Help Enterprises and State representatives toward the extension of water mains to serve all residential properties within City limits and the city's periphery that are currently participating in the County's Household Tank Program. The two main areas of focus are N. Cobb Street (northwest of State Route 65 and Pioneer Avenue), and S. Cloverleaf Street (southeast of State Route 65 and Olive Avenue). The State has maintained its commitment to grant-fund the necessary infrastructure and connection fees, providing an official funding letter to the City on January 18, 2018, which commits up to $2.81 million in funding until December 31, 2019. The authorization to advertise for bids for the water connection project was approved by the Council at its July 17th meeting, after which DWR reviewed the bid package for compliance and approved in December the package for advertisement. Council authorized award of the construction contract for approximately $1.82 million at its meeting on January 15, 2019.

City staff conducted a pre-construction public outreach meeting with the affected residents on the status of the project on Thursday, April 4, 2019.

Council authorized the agreement with Self-Help Enterprises Inc. to provide the private residential connections at its meeting on July 2, 2019, and construction work began on the project. At its meeting on October 1, 2019, the Council accepted the public works segment of the project in the installation of water mains as complete, with Self-Help and CSET continuing to collaborate on the completion of the individual private connections and abandonment of private wells. City staff has recently been made aware that there may be a couple of additional residences whose wells are dry that are located along existing City water mains or may require further extension of water mains.

Staff is coordinating with State staff on addressing these new isolated needs.

County OES and the State Division of Drinking Water (DDW) have reported to the City that the Central Mutual Water Company, located south of the city and south of Gibbons Avenue, has had its well run dry and desires an immediate emergency connection to the City's water system to serve the forty-one (41) connections currently without water. DDW is wishing to support a financial application to upgrade the small water system to City standards (new water lines, meters ,etc.), and to sponsor an Urban Development Boundary (UDB) Amendment application to Tulare County Local Agency Formation Commission (LAFCO), given this area is currently outside the City's UDB but within the City's Urban Area Boundary (UAB). Given several private wells have run dry in this area, DDW is also attempting to sponsor their connection to the City's water system. For source water capacity for the connections, DWR will include these new connections within the East Porterville water connection capacity development projects. At its Special meeting on August 30, 2019, the City Council directed staff to proceed with the immediate emergency connection of the Central water system, with the permanent connection of the system contingent upon an Agreement with DDW to the sponsorship conditions they have offered. At its meeting on October 1, 2019, the Council directed staff to proceed with the amendment of the UDB to facilitate annexation, which a public meeting with the affected residents was conducted on Wednesday, October 9, 2019. At its meeting on April 21, 2020, the Council conducted a Item No. 19.

Public Hearing and approved Resolutions of approval of the environmental determination and amendment to the UDB to facilitate annexation. At its meeting on June 1, 2021, the Council approved the State Water Board funding agreement for the development of a City-owned production well, distribution mains and water meters to serve each customer, as well as fire hydrants. On July 20, 2021, the City received notification from the State Water Board that the Akin/Central Water Consolidation Project funding agreement had been formally approved and executed.

DDW has also reported to the City that the Del Oro East Plano water system, located on Paul Street (southeast of the intersection of Plano Street and Worth Avenue), is experiencing problems with its existing well and have implemented severe water restrictions. The East Plano water system serves fourteen (14) residences and approximately forty-five (45) people. DDW is wishing to provide financial support to upgrade the small water system to City standards (new water lines, meters ,etc.), and for source water capacity for the connections, DDW would need to either pay appropriate fees and/or develop a capacity development project. The Council is aware that the Del Oro Grandview Gardens water system (north of W. North Grand Avenue) is also experiencing significant issues, and DDW may seek their future consolidation with the City's water system as well.

DDW has further reported to the City that the Beverly Grand Mutual Water Company water system, located north of West North Grand Avenue, is experiencing problems with its existing well and water quality issues, and desires its connection to the City's system to serve the thirty-one (31) residences the system serves. DDW is wishing to provide financial support to upgrade the small water system to City standards (new water lines, meters ,etc.), and for source water capacity for the connections, DDW has agreed to pay appropriate fees toward developing a capacity development project, which at its meeting of October 3, 2017, the Council approved a purchase agreement with Smee Homes, Inc. for the acquisition of property along the Tule River for the development of a new municipal well. At its meeting of October 1, 2019, the Council approved proceeding with the consolidation of the Beverly Grand water system.

RECOMMENDATION: That the City Council receive the report of status and review of the Declaration of Local Emergency and determine the need exists to continue said Declaration.

ATTACHMENTS: 1. City of Porterville Resolution Declaring Local Drought Emergency: May 5, 2015

2. United States Department of Agriculture Drought Natural Disaster Area Designation: March 5, 2021

3. State of California State of Emergency Proclamation: April 21, 2021

4. County of Tulare Drought Local Emergency Resolution:

Item No. 19.

April 27, 2021

5. State Water Resources Control Board: Emergency
Regulation - Water Conservation; January 4, 2022

6. Governor Newsom Executive Order N-7-22: March 28,
2022

7. State Water Resources Control Board: Emergency
Regulation - Water Conservation; June 10, 2022

8. Governor Newsom Executive Order N-5-23: March 24,
2023

9. State Water Resources Control Board Funding Agreement:

Akin/Central Water Consolidation Project
Appropriated/Funded:

Review By:

Department Director:

John Lollis, City Manager
Final Approver: John Lollis, City Manager

EXECUTIVE DEPARTMENT

STATE OF CALIFORNIA
State of Emergency Proclamation
WHEREAS climate change is intensifying the impacts of droughts on our communities, environment and economy, and California must therefore improve drought resiliency and prepare to respond to more frequent, prolonged, and intense dry periods; and
WHEREAS much of the West is experiencing severe to exceptional drought and California is in a second consecutive year of dry conditions, resulting in drought or near-drought throughout many portions of the State; and WHEREAS these drought conditions can result in degraded water quality, fallowing of productive farmland, setbacks to vulnerable and rural communities through job losses and longer-lasting recoveries, significant impacts to tribal, commercial, and recreational salmon fisheries, constraints on access to traditional lifeways, loss of aquatic and terrestrial biodiversity, and ecosystem impacts; and
WHEREAS drought conditions vary across the State and some watersheds, including the Russian River and Klamath Basin, are extremely dry and are facing substantial water supply and ecosystem challenges; and
WHEREAS it is necessary to expeditiously mitigate the effects of the drought conditions within the Russian River Watershed, located within Mendocino and Sonoma counties, to ensure the protection of health, safety, and the environment; and
WHEREAS experience in the last drought has demonstrated the value of preparing earlier for potential sustained dry conditions, the need to improve our monitoring and forecasting capabilities, and many other lessons that are captured in the Administration1s Report to the Legislature on the 2012-2016 Drought; and
WHEREAS the State and its many partners have strengthened drought resilience since the last drought including state investments in water management systems, implementation of the Sustainable Groundwater Management Act, establishment of the Safe and Affordable Fund for Equity and Resilience Program, development of the Administration's Water Resilience Portfolio, and continued water conservation by Californians whose current statewide urban water use is 16% lower than at the beginning of the last drought; and
WHEREAS state agencies have been actively responding to current drought conditions and preparing for the possibility of a third dry year including through convenings of the interagency drought team, which was established at my direction, to organize, focus, and track changing conditions, coordinate state agency responses, and work closely with partners across the State; and WHEREAS under the provisions of Government Code section 8558(b), I find that the conditions caused by the drought conditions, by reason of their magnitude, are or are likely to be beyond the control of the services, personnel, equipment, and facilities of any single local government and require the combined forces of a mutual aid region or regions to appropriately respond; and
WHEREAS under the provisions of Government Code section 8625(c), I find that local authority is inadequate to cope with the drought conditions; and WHEREAS to protect public health and safety, it is critical the State take certain immediate actions without undue delay to prepare for and mitigate the effects of, the drought conditions within the Russian River Watershed, and under the provisions of Government Code section 8571, I find that strict compliance with various statutes and regulations specified in this Proclamation would prevent, hinder, or delay the mitigation of the effects of the drought conditions of the Russian River Watershed, located within Mendocino and Sonoma counties.

NOW THEREFORE, I, GAVIN NEWSOM, Governor of the State of California, in accordance with the authority vested in me by the State Constitution and statutes, including the California Emergency Services Act, and in particular, section 8625, HEREBY PROCLAIM A STATE OF EMERGENCY to exist in Mendocino and Sonoma counties due to drought conditions in the Russian River Watershed.

IT IS HEREBY ORDERED THAT:

1. To further the success of California's water conservation efforts and increase our drought preparedness, state agencies shall partner with local water districts and utilities to make all Californians aware of drought, and encourage actions to reduce water usage by promoting the Department of Water Resources' Save Our Water campaign
(https://saveourwater.com) and other water conservation programs.

2. To continue coordination with partners across the State for the potential of prolonged drought impacts, the Department of Water Resources, the State Water Resources Control Board (Water Board), the Department of Fish and Wildlife, and the Department of Food and Agriculture shall work with regional and local governments, including groundwater sustainability agencies, to identify watersheds, communities, public water systems, and ecosystems that may require coordinated state and local actions to address issues stemming from continued dry conditions, to ensure that we can respond to water shortages and protect people, natural resources and economic activity.

3. To continue partnership and coordination with Californian Native American tribes, state agencies shall engage in consultation, collaboration, and communication with California Native American tribes to assist them in necessary preparation and response to drought conditions on tribal lands and potential impacts to cultural and traditional resources within ancestral lands.

4. To prioritize drought response and preparedness resources, the Department of Water Resources, the Water Board, the Department of Fish and Wildlife and the Department of Food and Agriculture, in consultation with the Department of Finance, shall:
a. Accelerate funding for water supply enhancement, water conservation, or species conservation projects.
b. Identify unspent funds that can be repurposed to enable projects to address drought impacts to people, ecosystems, and economic activities.
c. Recommend additional financial support for water resilience infrastructure projects and actions for potential inclusion in the upcoming May Revision.

5. To increase resilience of our water supplies during drought conditions, the Department of Water Resources shall:
a. Work with counties to encourage reporting of household water shortages, such as dry residential wells, on the website the Department maintains for that purpose, to enable tracking of drought impacts.
b. Work with counties, and groundwater sustainability agencies as appropriate, to help ensure that well drillers submit required groundwater well logs for newly constructed and deepened wells in a timely manner.
c. Work with agricultural water suppliers and agricultural water users to provide technical assistance, including implementation of efficient water management practices and use of technology such as the California Irrigation Management Information System.
d. Work with urban and agricultural water suppliers to encourage timely submittal by water districts and public posting of urban water management and water shortage contingency plans and
agricultural water management and drought plans.
e. Accelerate updating the land subsidence data it is providing to support implementation of the Sustainable Groundwater
Management Act.

6. To increase resilience of our water systems during drought conditions, the Water Board shall:
a. Use its authority, provide technical assistance, and where feasible provide financial assistance, to support regular reporting of drinking water supply well levels and reservoir water levels where the Water Board determines that there is risk of supply failure because of lowering groundwater levels or reservoir levels that may fall below public water system intakes.
b. Prioritize the permitting of public water systems that anticipate the need to activate additional supply wells where water quality is a concern and treatment installation needs to proceed to relieve a system's potential supply concerns.
c. Provide annual water demand data, information on water right priority, and other communications on water availability on its website.
d. Identify watersheds where current diversion data is insufficient to evaluate supply impacts caused by dry conditions, and take actions to ensure prompt submittal of missing data in those watersheds.

7. To address the acutely dry conditions in the Russian River Watershed, the Water Board shall consider:
a. Modifying requirements for reservoir releases or diversion limitations in that watershed to ensure adequate, minimal water supplies for critical purposes.
b. Adopting emergency regulations to curtail water diversions when water is not available at water rights holders' priority of right or to protect releases of stored water.

For purposes of carrying out this directive, Public Resources Code, Division 13 (commencing with section 21000) and regulations adopted pursuant to that Division are suspended in the counties of Mendocino and Sonoma to the extent necessary to address the impacts of the drought in the Russian River Watershed. The Water Board shall identify the projects eligible for the suspensions pursuant to this paragraph and maintain on its websites a list of the activities or approvals for which these provisions are suspended.

8. To ensure that equipment and services necessary for drought response in the Russian River Watershed can be procured quickly, the provisions of the Government Code and the Public Contract Code applicable to procurement, state contracts, and fleet assets, including, but not limited to, advertising and competitive bidding requirements, are hereby suspended to the extent necessary to address the effects of the drought in the Russian River Watershed, located within Mendocino and Sonoma counties. Approval of the Department of Finance is required prior to the execution of any contract entered into pursuant to this provision.

9. To increase the resilience of our natural habitats to protect vulnerable species during drought conditions, the Department of Fish and Wildlife shall:
a. Evaluate and take actions to protect terrestrial and aquatic species and, wherever possible, work with water users and other parties on voluntary measures to protect species.
b. Work to improve State hatcheries and increase water use efficiency on State wildlife areas and ecological reserves to maintain habitat for vulnerable species.
c. Respond to human-wildlife interactions related to ongoing dry conditions and increase public messaging and awareness. d. Work with commercial and recreational salmon fishing and tribal representatives to anticipate and develop strategies to mitigate and respond to salmon fishery impacts, with particular emphasis on addressing impacts to salmon fisheries in the Klamath Basin.

10.To support our agricultural economy and food security during drought conditions, the Department of Food and Agriculture shall:
a. Provide technical assistance to support conservation planning, onfarm water and energy conservation practices and technologies, including augmenting the State Water Efficiency and Enhancement Program.
b. Conduct an economic analysis of drought impacts to agriculture, including land use, jobs, and rural food economies, expanding on existing research done in the last drought to include thorough regional analysis especially in the Central Valley, and in the implementation of the Sustainable Groundwater Management Act and alternative land uses for fallowed land.
c. Maintain a web page with drought resources for farmers and ranchers, including the United States Department of Agriculture and other federal and state resources.
d. Work with federal agencies to assist Klamath Basin farmers and ranchers contending with reduced water supplies.

11.To ensure the potential impacts of drought on communities are anticipated and proactively addressed, the Department of Water Resources, in coordination with the Water Board, shall develop groundwater management principles and strategies to monitor, analyze, and minimize impacts to drinking water wells.

12.To provide critical information on the different drought conditions across the State, the Department of Water Resources, in consultation with the Department of Fish and Wildlife, the Department of Food and Agriculture, and the Water Board, shall develop a California Drought Monitor by December 31, 2021, as recommended in the Administration's Report to the Legislature on the 2012-2016 Drought.

13.To prepare for potential salinity issues in the Delta, the Department of Water Resources, in consultation with the Water Board, the Department of Fish and Wildlife, the Delta Stewardship Council, and the Central Valley Flood Protection Board, shall initiate actions necessary to prepare for and address potential Delta salinity issues during prolonged drought conditions.

14.To prepare for potential impacts of drought conditions on species, the Water Board and the Department of Fish and Wildlife shall work with federal agency partners to manage temperature conditions for the preservation of fish in the Sacramento River downstream of Shasta Dam while balancing water supply needs.

This Proclamation is not intended to, and does not, create any rights or benefits, substantive or procedural, enforceable at law or in equity, against the State of California, its agencies, departments, entities, officers, employees, or any other person.

I FURTHER DIRECT that as soon as hereafter possible, this Proclamation be filed in the Office of the Secretary of State and that widespread publicity and notice be given of this Proclamation.

IN WITNESS WHEREOF I have hereunto set
my hand and caused the Great Seal of the
State of alifornia t be affixed this 21st
day of ril 2021
ATTEST:

RESOLUTION PROCLAIMING A LOCAL EMERGENCY

BY THE BOARD OF SUPERVISORS

COUNTY OF TULARE, STATE OF CALIFORNIA

IN THE MATTER OF A

LOCAL EMERGENCY DUE TO )

SEVERE DROUGHT CONDITIONS)
RESOLUTION NO. 2021-0290
WHEREAS, California's most recent drought spanning from approximately 2012 to 2018 required the proclamation of a Local Emergency by the County of Tulare from February 2014 to November 2019, as well as a Governor's State of Emergency and the combined resources of multiple local, state, and federal agencies, commercial entities, and non-profit organizations to mitigate; and
WHEREAS, over 3,000 failed or dry wells - including private domestic, community, and agricultural wells - were reported to Tulare County from 2014 to 2017 as a result of the prior drought, causing significant health, safety, and economic issues for Tulare County residents and businesses; and
WHEREAS, well over $100 million in emergency relief and permanent infrastructure projects were expended to mitigate the effects of the prior drought; and WHEREAS, a hydrological year ("water year") runs from October 1 to September 30 of the following year; and
WHEREAS, the current water year beginning October 1, 2020 is, to date, the third-driest on record, with potential to become the driest on record without significant additional precipitation which is unlikely to occur during the traditionally dry months; and WHEREAS, the United States Drought Monitor shows that 94.51 % of Tulare County is currently experiencing "Extreme Drought" (D3) conditions and the remaining 5.49% is in "Severe Drought" (D2) conditions, and the County of Tulare anticipates that these conditions will progress to "Exceptional Drought" (D4) conditions as occurred in the prior drought based on the current Southern Sierra snowpack measured at only 15% of historical average for April 1st, drastically reduced surface water allocations on the State Water Project and Central Valley Project, and correspondingly low water levels in local reservoirs ; and WHEREAS, surface water supply constraints create a demonstrable and unsustainable increase in demand for groundwater which is likely to cause additional dry wells for community water systems, private domestic wells, and agricultural wells, creating economic hardships and conditions of extreme peril to the health and safety of individuals within Tulare County requiring the combined forces of all levels of government to mitigate; and WHEREAS, California Government Code section 8630 empowers the Board of Supervisors to proclaim the existence or threatened existence of a local emergency; and WHEREAS, Section 1-15-1005 of the Tulare County Ordinance Code defines "emergency" to include "the actual or threatened existence of conditions of disaster or of extreme peril to the safety of persons and property within [Tulare] County caused by such conditions as air pollution, fire, flood , storm , epidemic, riot, earthquake, or other conditions, ... which conditions are or are likely to be beyond the control of the services, personnel, equipment, and facilities of [Tulare] County, requiring the combined forces of other political subdivisions to combat"; and
NOW, THEREFORE, IT IS HEREBY PROCLAIMED that a local emergency now exists throughout said Tulare County due to drought which has created conditions of disaster and extreme peril to the safety of persons and property within the County, and that such conditions are or are likely to be beyond the control of the services, personnel , equipment, and/or facilities of this County, thus requiring the combined forces of other political subdivisions to combat; and IT IS FURTHER PROCLAIMED that this local emergency is proclaimed pursuant to the California Emergency Services Act, California Government Code §8550 et seq.; and IT IS REQUESTED that the Governor of the State of California find and proclaim Tulare County to be in a State of Emergency, and make available any and all material and financial support and resources necessary to combat the conditions of disaster, including but not limited to California Disaster Assistance Act funding for emergency protective measures and increased funding to relevant programs of the State Water Resources Control Board and Department of Water Resources ; and
IT IS FURTHER REQUESTED that the Governor waive and all regulations and statutes that may hinder response to this emergency; and
IT IS PROCLAIMED AND ORDERED that during the existence of said local emergency, the powers, functions, and duties of the emergency organization of Tulare County shall be those prescribed by State law, by ordinances and resolutions of Tulare County, and by the Tulare County Operational Area Emergency Operations Plan, as approved by the Board of Supervisors.

UPON MOTION OF SUPERVISOR MICARI, SECONDED BY SUPERVISOR

TOWNSEND, THE FOLLOWING WAS ADOPTED BY THE BOARD OF
SUPERVISORS, AT AN OFFICIAL MEETING HELD APRIL 27, 2021 , BY THE FOLLOWING VOTE:

AYES: SUPERVISORS MICARI , VANDERPOEL, SHUKLIAN, VALERO AND

TOWNSEND
NOES: NONE
ABSTAIN : NONE
ABSENT: NONE
~~~smia~rp__e:w. "fl
ATTEST:

BY:

JASON T. BRITT

COUNTY ADMINISTRATIVE OFFICER/

CLERK, BOARD OF SUPERVISORS

STATE WATER RESOURCES CONTROL BOARD
RESOLUTION NO. 2022-0002

TO ADOPT AN EMERGENCY REGULATION

TO SUPPLEMENT VOLUNTARY WATER CONSERVATION
WHEREAS:

1. On April 21, May 10, and July 8, 2021, Governor Newsom issued proclamations that a state of emergency exists in a total of 50 counties due to severe drought conditions and directed state agencies to take immediate action to preserve critical water supplies and mitigate the effects of drought and ensure the protection of health, safety, and the environment.

2. On October 19, 2021, Governor Newsom signed a proclamation extending the drought emergency statewide and further urging Californians to reduce their water use.

3. There is no guarantee that winter precipitation will alleviate the current drought conditions.

4. Many Californians have taken bold steps over the years to reduce water use; nevertheless, the severity of the current drought and uncertainty about Water Year 2022 require additional conservation actions from residents and businesses.

5. Water conservation is the easiest, most efficient, and most cost-effective way to quickly reduce water demand and extend supplies into the next year, providing flexibility for all California communities. Water saved is water available next year, giving water suppliers the flexibility to manage their systems efficiently. The more water that is conserved now, the less likely it is that a community will experience such dire circumstances or that water rationing will be required.

6. Most Californians use more water outdoors than indoors. In many areas, 50 percent or more of daily water use is for lawns and outdoor landscaping. Outdoor water use is generally discretionary, and many irrigated landscapes would not suffer greatly from receiving a decreased amount of water.
2 7. Public information and awareness are critical to achieving conservation goals, and the Save Our Water campaign (SaveOurWater.com), run jointly by the Department of Water Resources (DWR) and the Association of California Water Agencies, is an excellent resource for conservation information and messaging that is integral to effective drought response.

8. SaveWater.CA.Gov is an online tool designed to help save water in communities. This website lets anyone easily report water waste from their phone, tablet, or computer by simply selecting the type of water waste they see, typing in the address where the waste is occurring, and clicking send.

These reports are filed directly with the State Water Resources Control Board (State Water Board or Board) and relevant local water supplier.

9. Enforcement against water waste is a key tool in conservation programs.

When conservation becomes a social norm in a community, the need for enforcement is reduced or eliminated.

10. On October 19, 2021, the Governor suspended the environmental review required by the California Environmental Quality Act to allow State Water Board-adopted drought conservation emergency regulations and other actions to take place quickly to respond to emergency conditions.

11. Water Code section 1058.5 grants the State Water Board the authority to adopt emergency regulations in certain drought years in order to: “prevent the waste, unreasonable use, unreasonable method of use, or unreasonable method of diversion, of water, to promote water recycling or water conservation, to require curtailment of diversions when water is not available under the diverter’s priority of right, or in furtherance of any of the foregoing, to require reporting of diversion or use or the preparation of monitoring reports.”

12. On November 30, 2021, the State Water Board issued public notice that the State Water Board would consider the adoption of the regulation at the Board’s regularly scheduled January 4, 2022 public meeting, in accordance with applicable State laws and regulations. The State Water Board also distributed for public review and comment a Finding of Emergency that complies with State laws and regulations.

13. The emergency regulation sets a minimum standard that many communities are already doing more but not everyone is taking these lowcost, easy to implement actions that can save significant amounts of water during a drought emergency.
3 14. Disadvantaged communities may require assistance in increasing water conservation, and state and local agencies should look for opportunities to provide assistance in promoting water conservation, including but not limited to translation of regulation text and dissemination of water conservation announcements into languages spoken by at least 10 percent of the people who reside in a water supplier’s service area, such as in newspaper advertisements, bill inserts, website homepage, social media, and notices in public libraries.

15. The Board directs staff to consider the following in pursuing any enforcement of section 995, subdivision (b)(1)(A)-(F): before imposing monetary penalties, staff shall provide one or more warnings; monetary penalties must be based on an ability to pay determination, consider allowing a payment plan of at least 12 months, and shall not result in a tax lien; and Board enforcement shall not result in shutoff.

16. The Board encourages entities other than Board staff that consider any enforcement of this regulation to apply these same factors identified in resolved paragraph 15. Nothing in the regulation or in the enforcement provisions of the regulation precludes a local agency from exercising its authority to adopt more stringent conservation measures. Moreover, the Water Code does not impose a mandatory penalty for violations of the regulation adopted by this resolution, and local agencies retain their enforcement discretion in enforcing the regulation, to the extent authorized, and may develop their own progressive enforcement practices to encourage conservation.

THEREFORE BE IT RESOLVED THAT:

1. The State Water Board adopts California Code of Regulations, title 23, section 995, as appended to this resolution as an emergency regulation.

2. State Water Board staff will submit the regulation to the Office of Administrative Law (OAL) for final approval.

3. If, during the approval process, State Water Board staff, the State Water Board, or OAL determines that minor corrections to the language of the regulation or supporting documentation are needed for clarity or consistency, the State Water Board Executive Director or designee may make such changes.
4 4. This regulation shall remain in effect for one year after filing with the Secretary of State unless the State Water Board determines that it is no longer necessary due to changed conditions or unless the State Water Board renews the regulation due to continued drought conditions, as described in Water Code section 1058.5.

5. The State Water Board directs State Water Board staff to work with the Department of Water Resources and the Save Our Water campaign to disseminate information regarding the emergency regulations.

6. Nothing in the regulation or in the enforcement provisions of the regulation precludes a local agency from exercising its authority to adopt more stringent conservation measures. Local agencies are encouraged to develop their own progressive enforcement practices to promote conservation.

CERTIFICATION
The undersigned Clerk to the Board does hereby certify that the foregoing is a full, true, and correct copy of a resolution duly and regularly adopted at a meeting of the State Water Resources Control Board held on January 4, 2022.

AYE: Vice Chair Dorene D’Adamo
Board Member Sean Maguire
Board Member Laurel Firestone
Board Member Nichole Morgan
NAY: None
ABSENT: Chair E. Joaquin Esquivel
ABSTAIN: None
Jeanine Townsend
Clerk to the Board
5 ADOPTED TEXT OF EMERGENCY REGULATION
Title 23. Waters
Division 3. State Water Resources Control Board and Regional Water Quality Control Boards
Chapter 3.5. Urban Water Use Efficiency and Conservation Article 2. Prevention of Drought Wasteful Water Uses
§ 995. Wasteful and Unreasonable Water Uses.
(a) As used in this section:
(1) “Turf” has the same meaning as in section 491.
(2) “Incidental runoff” means unintended amounts (volume) of runoff, such as unintended, minimal overspray from sprinklers that escapes the area of intended use.

Water leaving an intended use area is not considered incidental if it is part of the facility or system design, if it is due to excessive application, if it is due to intentional overflow or application, or if it is due to negligence.
(b)(1) To prevent the unreasonable use of water and to promote water conservation, the use of water is prohibited as identified in this subdivision for the following actions:
(A) The application of potable water to outdoor landscapes in a manner that causes more than incidental runoff such that water flows onto adjacent property, non-irrigated areas, private and public walkways, roadways, parking lots, or structures;
(B) The use of a hose that dispenses water to wash a motor vehicle, except where the hose is fitted with a shut-off nozzle or device attached to it that causes it to cease dispensing water immediately when not in use; (C) The use of potable water for washing sidewalks, driveways, buildings, structures, patios, parking lots, or other hard surfaced areas, except in cases where health and safety are at risk;
(D) The use of potable water for street cleaning or construction site preparation purposes, unless no other method can be used or as needed to protect the health and safety of the public;
(E) The use of potable water for decorative fountains or the filling or topping-off of decorative lakes or ponds, with exceptions for those decorative fountains, lakes, or ponds that use pumps to recirculate water and only require refilling to replace evaporative losses;
(F) The application of water to irrigate turf and ornamental landscapes during and within 48 hours after measurable rainfall of at least one fourth of one inch of rain.

In determining whether measurable rainfall of at least fourth of one inch of rain occurred in a given area, enforcement may be based on records of the National Weather Service, the closest CIMIS station to the parcel, or any other reliable source of rainfall data available to the entity undertaking enforcement of this subdivision; and
(G) The use of potable water for irrigation of ornamental turf on public street medians.
6 (2) Notwithstanding subdivision (b)(1), the use of water is not prohibited by this section to the extent necessary to address an immediate health and safety need. This may include, but is not limited to, the use of potable water in a fountain or water feature when required to be potable because human contact is expected to occur. (c)(1) To prevent the unreasonable use of water and to promote water conservation, any homeowners’ association or community service organization or similar entity is prohibited from:
(A) Taking or threatening to take any action to enforce any provision of the governing documents or architectural or landscaping guidelines or policies of a common interest development where that provision is void or unenforceable under section 4735, subdivisions (a) and (b) of the Civil Code; (B) Imposing or threatening to impose a fine, assessment, or other monetary penalty against any owner of a separate interest for reducing or eliminating the watering of vegetation or lawns during a declared drought emergency, as described in section 4735, subdivision (c) of the Civil Code; or (C) Requiring an owner of a separate interest upon which water-efficient landscaping measures have been installed in response to a declared drought emergency, as described in section 4735, subdivisions (c) and (d) of the Civil Code, to reverse or remove the water-efficient landscaping measures upon the conclusion of the state of emergency.
(2) As used in this subdivision:
(A) “Architectural or landscaping guidelines or policies” includes any formal or informal rules other than the governing documents of a common interest development.
(B) “Homeowners’ association” means an “association” as defined in section 4080 of the Civil Code.
(C) “Common interest development” has the same meaning as in section 4100 of the Civil Code.
(D) “Community service organization or similar entity” has the same meaning as in section 4110 of the Civil Code.
(E) “Governing documents” has the same meaning as in section 4150 of the Civil Code.
(F) “Separate interest” has the same meaning as in section 4185 of the Civil Code.
(3) If a disciplinary proceeding or other proceeding to enforce a rule in violation of subdivision (c)(1) is initiated, each day the proceeding remains pending shall constitute a separate violation of this regulation.
(d) To prevent the unreasonable use of water and to promote water conservation, any city, county, or city and county is prohibited from imposing a fine under any local maintenance ordinance or other relevant ordinance as prohibited by section 8627.7 of the Government Code.
7 (e) The taking of any action prohibited in subdivision (b), (c) or (d) is an infraction punishable by a fine of up to five hundred dollars ($500) for each day in which the violation occurs. The fine for the infraction is in addition to, and does not supersede or limit, any other remedies, civil or criminal.
(f) A decision or order issued under this section by the Board or an officer or employee of the Board is subject to reconsideration under article 2 (commencing with section 1122) of chapter 4 of part 1 of division 2 of the Water Code.

Authority: Section 1058.5, Water Code.

References: Article X, Section 2, California Constitution; Sections 4080, 4100, 4110, 4150, 4185, and 4735, Civil Code; Section 8627.7, Government Code; Sections 102, 104, 105, 275, 350, 491, and 1122, Water Code; Light v. State Water Resources Control Board (2014) 226 Cal.App.4th 1463; Stanford Vina Ranch Irrigation Co. v. State of California (2020) 50 Cal.App.5th 976.

EXECUTIVE DEPARTMENT

STATE OF CALIFORNIA
EXECUTIVE ORDER N-7-22
WHEREAS on April 12, 202 l, May l 0, 2021, July 8, 202 l, and October 19, 2021, I proclaimed states of emergency that continue today and exist across all the counties of California, due to extreme and expanding drought conditions; and
WHEREAS climate change continues to intensify the impacts of droughts on our communities, environment, and economy, and California is in a third consecutive year of dry conditions, resulting in continuing drought in all parts of the State; and
WHEREAS the 21st century to date has been characterized by record warmth and predominantly dry conditions, and the 2021 meteorological summer in California and the rest of the western United States was the hottest on record; and
WHEREAS since my October 19, 2021 Proclamation, early rains in October and December 2021 gave way to the driest January and February in recorded history for the watersheds that provide much of California's water supply; and WHEREAS the ongoing drought will have significant, immediate impacts on communities with vulnerable water supplies, farms that rely on irrigation to grow food and fiber, and fish and wildlife that rely on stream flows and cool water; and
WHEREAS the two largest reservoirs of the Central Valley Project, which supplies water to farms and communities in the Central Valley and the Santa Clara Valley and provides critical cold-water habitat for salmon and other anadromous fish, have water storage levels that are approximately l .1 million acre-feet below last year's low levels on this date; and WHEREAS the record-breaking dry period in January and February and the absence of significant rains in March have required the Department of Water Resources to reduce anticipated deliveries from the State Water Project to 5 percent of requested supplies; and
WHEREAS delivery of water by bottle or truck is necessary to protect human safety and public health in those places where water supplies are disrupted; and
WHEREAS groundwater use accounts for 41 percent of the State's total water supply on an average annual basis but as much as 58 percent in a critically dry year, and approximately 85 percent of public water systems rely on groundwater as their primary supply; and
WHEREAS coordination between local entities that approve permits for new groundwater wells and local groundwater sustainability agencies is important to achieving sustainable levels of groundwater in critically overdrafted basins; and
WHEREAS the duration of the drought, especially following a multiyear drought that abated only five years ago, underscores the need for California to redouble near-, medium-, and long-term efforts to adapt its water management and delivery systems to a changing climate, shifting precipitation patterns, and water scarcity; and
WHEREAS the most consequential, immediate action Californians can take to extend available supplies is to voluntarily reduce their water use by 15 percent from their 2020 levels by implementing the commonsense measures identified in operative paragraph 1 of Executive Order N-10-21 (July 8, 2021 ); and
WHEREAS to protect public health and safety, it is critical the State take certain immediate actions without undue delay to prepare for and mitigate the effects of the drought conditions, and under Government Code section 8571, I find that strict compliance with various statutes and regulations specified in this Proclamation would prevent, hinder, or delay the mitigation of the effects of the drought conditions.

NOW, THEREFORE, I, GAVIN NEWSOM, Governor of the State of California, in accordance with the authority vested in me by the State Constitution and statutes, including the California Emergency Services Act, and in particular, Government Code sections 8567, 8571, and 8627, do hereby issue the following Order to become effective immediately:

IT IS HEREBY ORDERED THAT:

1. The orders and provisions contained in my April 21, 2021, May 10, 2021, July 8, 2021, and October 19, 2021 Proclamations remain in fu ll force and effect, except as modified by those Proclamations and herein.

State agencies shall continue to implement all directions from those Proclamations and accelerate implementation where feasible.

2. To help the State achieve its conservation goals and ensure sufficient water for essential indoor and outdoor use, I call on all Californians to strive to limit summertime water use and to use water more efficiently indoors and out. The statewide Save Our Water conservation campaign at SaveOurWater.com provides simple ways for Californians to reduce water use in their everyday lives. Furthermore, I encourage Californians to understand and track the amount of water they use and measure their progress toward their conservation goals.

3. By May 25, .2022, the State Water Resources Control Board (Water Board) shall consider adopting emergency regulations that include all of the following:
a. A requirement that each urban water supplier, as defined in section 10617 of the Water Code, shall submit to the Department of Water Resources a preliminary annual water supply and demand assessment consistent with section 10632.1 of the Water Code no later than June 1, 2022, and submit a final annual water supply and demand assessment to the Department of Water Resources no later than the deadline set by section 10632.1 of the Water Code;
b. A requirement that each urban water supplier that has submitted a water shortage contingency plan to the
Department of Water Resources implement, at a minimum, the shortage response actions adopted under section 10632 of the Water Code for a shortage level of up to twenty percent (Level 2), by a date to be set by the Water Board; and
c. A requirement that each urban water supplier that has not submitted a water shortage contingency plan to the
Department of Water Resources implement, at a minimum,
shortage response actions established by the Water Board, which shall take into consideration model actions that the Department of Water Resources shall develop for urban water supplier water shortage contingency planning for Level 2, by a date to be set by the Water Board.

To further conserve water and improve drought resiliency if the drought lasts beyond this year, I encourage urban water suppliers to conserve more than required by the emergency regulations described in this paragraph and to voluntarily activate more stringent local requirements based on a shortage level of up to thirty percent (Level 3).

4. To promote water conservation, the Department of Water Resources shall consult with leaders in the commercial, industrial, and institutional sectors to develop strategies for improving water conservation, including direct technical assistance, financial assistance, and other approaches. By May 25, 2022, the Water Board shall consider adopting emergency regulations defining "non-functional turf" (that is, a definition of turf that is ornamental and not otherwise used for human recreation purposes such as school fields, sports fields, and parks) and banning irrigation of non-functional turf in the commercial, industrial, and institutional sectors except as it may be required to ensure the health of trees and other perennial non-turf plantings.

5. In order to maximize the efficient use of water and to preserve water supplies critical to human health and safety and the environment, Public Resources Code, Division 13 (commencing with section 21000) and regulations adopted pursuant to that Division are hereby suspended, with respect to the directives in paragraphs 3 and 4 of this Order and any other projects and activities for the purpose of water conservation to the extent necessary to address the impacts of the drought, and any permits necessary to carry out such projects or activities. Entities that desire to conduct activities under this suspension, other than the directives in paragraphs 3 and 4 of this Order, shall first request that the Secretary of the Natural Resources Agency make a determination that the proposed activities are eligible to be conducted under this suspension. The Secretary shall use sound discretion in applying this Executive Order to ensure that the suspension serves the purpose of accelerating conservation projects that are necessary to address impacts of the drought, while at the same time protecting public health and the environment. The entities implementing these directives or conducting activities under this suspension shall maintain on their websites a list of all activities or approvals for which these provisions are suspended.

6. To support voluntary approaches to improve fish habitat that would require change petitions under Water Code section 1707 and either Water Code sections 1425 through 1432 or Water Code sections 1725 through 1732, and where the primary purpose is to improve conditions for fish, the Water Board shall expeditiously consider petitions that add a fish and wildlife beneficial use or point of diversion and place of storage to improve conditions for anadromous fish. California Code of Regulations, title 23, section 1064, subdivisions ( a) ( 1) (A) (i)-(ii) are suspended with respect to any petition that is subject to this paragraph.

7. To facilitate the hauling of water for domestic use by local communities and domestic water users threatened with the loss of water supply or degraded water quality resulting from drought, any ordinance, regulation, prohibition, policy, or requirement of any kind adopted by a public agency that prohibits the hauling of water out of the water's basin of origin or a public agency's jurisdiction is hereby suspended. The suspension authorized pursuant to this paragraph shall be limited to the hauling of water by truck or bottle to be used for human consumption, cooking, or sanitation in communities or residences threatened with the loss of affordable safe drinking water.

Nothing in this paragraph limits any public health or safety requirement to ensure the safety of hauled water.

8. The Water Board shall expand inspections to determine whether illegal diversions or wasteful or unreasonable use of water are occurring and bring enforcement actions against illegal diverters and those engaging in the wasteful and unreasonable use of water. When access is not granted by a property owner, the Water Board may obtain an inspection warrant pursuant to the procedures set forth in Title 13 (commencing with section 1822.50) of Part 3 of the Code of Civil Procedure for the purposes of conducting an inspection pursuant to this directive.

9. To protect health, safety, and the environment during this drought emergency, a county, city, or other public agency shall not:
a. Approve a permit for a new groundwater well or for alteration of an existing well in a basin subject to the Sustainable
Groundwater Management Act and classified as medium- or high-priority without first obtaining written verification from a Groundwater Sustainability Agency managing the basin or area of the basin where the well is proposed to be located that groundwater extraction by the proposed well would not be inconsistent with any sustainable groundwater management program established in any applicable Groundwater
Sustainability Plan adopted by that Groundwater Sustainability Agency and would not decrease the likelihood of achieving a sustainability goal for the basin covered by such a plan; or b. Issue a permit for a new groundwater well or for alteration of an existing well without first determining that extraction of groundwater from the proposed well is (1) not likely to interfere with the production and functioning of existing nearby wells, and (2) not likely to cause subsidence that would adversely impact or damage nearby infrastructure.

This paragraph shall not apply to permits for wells that will provide less than two acre-feet per year of groundwater for individual domestic users, or that will exclusively provide groundwater to public water supply systems as defined in section 116275 of the Health and Safety Code.

10. To address household or small community drinking water shortages dependent upon groundwater wells that have failed due to drought conditions, the Department of Water Resources shall work with other state agencies to investigate expedited regulatory pathways to modify, repair, or reconstruct failed household or small community or public supply wells, while recognizing the need to ensure the sustainability of such wells as provided for in paragraph 9.

11. State agencies shall collaborate with tribes and federal, regional, and local agencies on actions related to promoting groundwater recharge and increasing storage.

12. To help advance groundwater recharge projects, and to demonstrate the feasibility of projects that can use available high water flows to recharge local groundwater while minimizing flood risks, the Water Board and Regional Water Quality Control Boards shall prioritize water right permits, water quality certifications, waste discharge requirements, and conditional waivers of waste discharge requirements to accelerate approvals for projects that enhance the ability of a local or state agency to capture high precipitation events for local storage or recharge, consistent with water right priorities and protections for fish and wildlife. For the purposes of carrying out this paragraph, Division 13 (commencing with section 21000) of the Public Resources Code and regulations adopted pursuant to that Division, and Chapter 3 ( commencing with section 85225) of Part 3 of Division 35 of the Water Code and regulations adopted pursuant thereto are hereby suspended to the extent necessary to address the impacts of the drought. This suspension applies to (a) any actions taken by state agencies, (b) any actions taken by local agencies where the state agency with primary responsibility for the implementation of the directives concurs that local action is required, and (c) permits necessary to carry out actions under (a) or (b). The entities implementing these directives shall maintain on their websites a list of all activities or approvals for which these provisions are suspended.

13. With respect to recharge projects under either Flood-Managed Aquifer Recharge or the Department of Water Resources Sustainable Groundwater Management Grant Program occurring on open and working lands to replenish and store water in groundwater basins that will help mitigate groundwater conditions impacted by drought, for any (a) actions taken by state agencies, (b) actions taken by a local agency where the Department of Water Resources concurs that local action is required, and (c) permits necessary to carry out actions under (a) or (b), Public Resources Code, Division 13 (commencing with section 21000) and regulations adopted pursuant to that Division are hereby suspended to the extent necessary to address the impacts of the drought. The entities implementing these directives shall maintain on their websites a list of all activities or approvals for which these provisions are suspended.

14. To increase resilience of.state water supplies during prolonged drought conditions, the Department of Water Resources shall prepare for the potential creation and implementation of a multi-year transfer program pilot project for the purpose of acquiring water from willing partners and storing and conveying water to areas of need.

15. By April 15, 2022, state agencies shall submit to the Department of Finance for my consideration proposals to mitigate the worsening effects of severe drought, including emergency assistance to communities and households and others facing water shortages as a result of the drought, facilitation of groundwater recharge and wastewater recycling, improvements in water use efficiency, protection of fish and wildlife, mitigation of drought-related economic or water-supply disruption, and other potential investments to support short- and long-term drought response.

IT IS FURTHER ORDERED that as soon as hereafter possible, this Order be filed in the Office of the Secretary of State and that widespread publicity and notice be given of this Order.

This Order is not intended to, and does not, create any rights or benefits, substantive or procedural, enforceable at law or in equity, against the State of California, its agencies, departments, entities, officers, employees, or any other person.

IN WITNESS WHEREOF I have hereunto set
my hand and caused the Great Seal of the
State of California to be affixed this 28th
day of March 2022.

I I
,:, .
l · I'
t (.1 I
l~~-~-- GAVIN NEWSOM
Governor of California
ATTEST:

SHIRLEY N. WEBER, PH.D.

Secretary of State
State of California
Office of Administrative Law
In re:

State Water Resources Control Board

NOTICE OF APPROVAL OF EMERGENCY

REGULATORY ACTION
Regulatory Action:

Title 23, California Code of Regulations
Adopt sections: 996
Amend sections:

Repeal sections:

Government Code Sections 11346.1 and
11349.6
OAL Matter Number: 2022-0606-03
OAS Makter Type: Emergency (E)
This emergency action by the State Water Resources Control Board adopts a new regulation which .requires urban water suppliers to submit preliminary supply and demand assessments to the Department of Water Resources and to implement Level 2 demand reduction actions (actions intended to result in a 10 to 20 percent savings).

The regulation bans the irrigation of non-functional turf with potable water in commercial, industrial, and institutional. sectors and establishes that such irrigation is an infraction punishable by a fine of up to five hundred dollars for each day in which. the violation occurs pursuant to Water Code section 1058.5(d).

OAL approves this emergency regulatory action pursuant to sections 11346.1 and 11349.6 of the Government Gode. Pursuant to Water Code section 1058.5(b}, the Finding of Emergency in this matter was exempt from Office of Administrative Law Review.

This emergency regulatory action is effective on 6/10/2022 and, pursuant to Water Cade section 1058.5(c), will expire on 6/1 Q/2023. The Certificate of Compliance far this action is due no later than 6/9/2023.

Date: June 10, 2022 ~ ~~„~, ~~-,
Dale Mentink`
Assistant Chief Counsel
For: Kenneth J. Pogue
Director
Original: Eileen Sobeck, Executive
Director
Copy: Garrett Lenahan
STATE OF CALIFORNIA—OPfICEOFADMINiSTRA E~nw
NOTICE PUBLIC/~TIOIV For use by Secretary of State only ~n,
sr~.aootRev.ionor9l ~
~f1L FILE N07ICE FILE NUMBER REGULATORY ACTION NUMBEgR~ g~ ~g EMER~GEi NyC~Y NUMBER N1Jt~/I$~f~'a" ~~ e~
For use by Once of Administrative law (OAL)
~X ~ ~d ~ S7 ll ~ '~ ~ r ,~ ~ ~~~li~ ~~i" °• _ «<-~ only ~,'.;?~ bffi~e c u ~ ~.e~ ,'~;1 ~,° ~;,;. _ ~(fhv S~.~ of ~~~nmi~
~~~~ s~,~, jm~ rti r ~a-s~

NOTICE REGULATIONS

AGENCY WITH RULEMAKING AUTHORITY
State Water AGENCY FILE NUMBER (if any) Resources Control Board A. PUBLICATION OF NOTICE (Complete for publication in Notice Register)

1. SUBJECT OF NOTICE TITLES) FIRST SECTION AFFECTED 2. REQUESTED PUBLICATION DATE

3. NOTICE TYPE - 4. AGENCY CONTACT PERSON TELEPHONE NUMBER FAX NUMBER (Optional) ❑ Notice re Proposed ("—►
Re ulato tither `Action L_~
OAL USE ACTION ON PRppgSFD NOTICE
~~~Y HPP~oveaas
NOTICE. R_FGISTER NUMBER '. Pl!BUCATlpN bATE APp~cvyas t" DisapProvh~+~ S~bnnroea ~ MorliheU ~ Witharawn B. SUBMISSION OF REGULATIONS (Complete when submitting regulations) 1a. SUBJECT OF REGULATION{S) ib. ALL PREVIOUS RELATED OAL REGULATORY ACTION NUMBERS) Water Demand Reduction Emergency Regulation

2. SPECIFY CALIFORNIA CODE Of REGULATIONS TITLES) AND SECTIONS) (including title 26, if toxics related) SECTIONS} AFFECTED A°oPT
{List all section number{s) 996
`individually. Attach aMeNo
_~cidi~a~al:_sF~eeh_6f~reeded.} __~_._ _--- ____ _._ ----_ ____ -- TITLE(S) REPEAL 23 3. TYPE OF FILING
Code
Regular
§11346)
Rulemaking {Gov. ❑Certificate of Compliance: The agency officer named ~ Emergency Readopt ~ Changes Without below certifies that this agency complied with the (Gov. Code, §11346.1 (h}) Regulatory Effect {CaL Resubmittal of disapproved provisions of Gov. Code §§11346.2-11347.3 either Code Regs., title 1, §100} or withdrawn nonemergency before the emergency regulation was adopted or filing (Gov. Code §§11349.3, within the time period required by statute. 11349.4) ❑File &Print ~ Print Oniy
§11346.1(b))
Emergency (Gov. Code, ~
emergency
Resubmittal
filing
of disapproved
(Gov. Code,
or
§11346.1)
withdrawn o ocher {sPe~~~> Wafer Code Section 1058.5

4. ALL BEGINNING AND ENDING DATES OF AVAILABILITY OF MODIFIED REGULATIONS AND/OR MATERIAL ADDED TO THE RULEMAKING FILE (Cal. Code Regs. line 1, §44 and Gov. Code §11347.1)

5. EFFECTIVE DATE OF CHANGES (Gov. Code, §§ 11343.4, 11346.1(d}; Cai. Code Regs., title 1, §100 ) Effective January 1, April 1, July 1, or x Effective on filing with §100 Changes Without Effective other October 1 (Gov. Code §11343.4(a)) ❑Secretary of State ❑Regulatory Effect ❑(Specify)

6. CHECK IF THESE REGULATIONS REQUIRE NOTICE T0, OR REVIEW, CONSULTATION, APPROVAL OR CONCURRENCE BY, ANOTHER AGENCY OR ENTITY Department of Fnance (Form STD. 399) {SAM §6660) ~ Fair Political Practices Commission ~ State Fire Marshal Other {Specify)

7. CONTACT PERSON TELEPHONE NUMBER FAX NUMBER {Optional) E-MAIL ADdRESS (Optional) Garrett Lenahan 916 341-5179

8. (certify
of the regulation{s)
that the attached
identified
copy
on
of the regulations) is a true and correct copy For use by Office of Administrative Law (OAL) only this form, that the information specified on this form is true and correct, and #hat I am the head of the agency taking this action, or a designee of the head of the agency, and am authori2ed to make this certification.

SIGNATURE OF AGENCY HEAD OR DESIGNEE PATE
Eric Oppenheimer °'g J.~te:20]IA6➢614:24:44 7a1ySgnedbyEncOp°~ibe -0]'00'1nef 6/612022

TYPED NAME AND TITLE OF SIGNATORY
Eric Oppenheimer, Chief Deputy Director, State Water Resources Control Board

ADOPTED EMERGENCY REGULATION TEXT
Title 23. Waters
Division 3. State Water Resources Control Board and Regional Water Quality Control Boards
Chapter 3.5. Urban Water Use Efficiency and Conservation Article. 2. Prevention of Drought Wasteful Water Uses
996. Urban Drought Response Actions
~a) As used in this section:
(1) "Commercial, industrial and institutionaP' refers to commercial water users, industrial water users, and .institutional water users as respectively defined in Water Code, section 10608:12. subdivisions (e), {i ,and (j), and includes homeowners' associations, common interest developments, community service organizations, and other similar entities but does not include the residences of these entities' members or separate interests. ~2) "Common interest development' has the same meaning as in section 4100 of the Civil Code.
~3) "Community service organization or similar entity" has the same meaning as in :section 4110 of the Civi( Code.
~4) "Homeowners' association" means an "association" as defined in section 4080 of the Civil Code.
(5} "Non-functional turf" means turf that is solely ornamental and not rec~ularly used for human recreational purposes or for civic or community events. Non-functional turf does not include sports fields and turF that is regularly used for human recreational purposes or for civic or community events.
(6} "Plant factor" has the same meaninct as in section 491. ~7) "Separate interest" has the same meaning as in section 4185 of the Civil Code. (8) "Turf" has the same meaning as in section 491.
(9} "Urban water supplier" has the same meaning as Water Code section 10617. (10) "Water shortage contingenc rLplan" means the plan required by Water Cade section 10632.
(b) Each urban water supplier shall submit to the Department of Water Resources a preliminary annual water su~ply and demand assessment consistent with section 10632.1 of the Water Cade no later than June 1 2022 or the effective date of this section whichever comes later, and submit a final annual water supply and demand assessment to the Department of Water Resources no later than the deadline set by section 10632.1 of the Water Code.
(i) The supplier's annual water supply and demand assessment submitted to the Department of Water`Resources demonstrates an ability to maintain reliable suppix until September 30, 2023.

Department of Water Resources.
(iii) The supplier's average number of gallons of water used per person per day by to twenty (20) gercent (Level ~, implement at a minimum the following actions:
(1) Initiate a public information and outreach campaign for water conservation and promptly and effectively reach the supplier's customers, using efforts such as ema papermail, bill inserts, customer app notifications, news articles, websites, comma events radio and television billboards and social media. potable water befinreen the hours of 10:00 a.m. and 6:00 p.m.

Level 2~
(2 Notwithstanding subdivision (c)(1), urban water suppliers shall not be required to implement new residential connection moratoria pursuant to this section. residential customers for the year 2020 is below 55 gallons, as reported to the Board in the :Electronic Annual Report.
has authority to enforce, as infractions, the prohibitions in section 995 and takes enforcement against violations.
(e) t1) To prevent the unreasonable use of water and to promote water conservation, the use: of potable water is prohibited for the irrigation of non-functional turf at commercial, industrial and institutional sites.
(2~ Notwithstanding subdivision (e)(1~, the use of water is not prohibited by this section to the extent necessary to ensure the health of trees and other perennial non-turf plantings or to the extent necessary to address an immediate health and safety need. (3) Notwithstanding subdivision (e)(1 ~, an urban water supplier may approve a request for continued irrigation of non-functional turFwhere the user certifies that the turf is a low water use plant with a plant factor of 0.3 or less, and demonstrates the actual use is less than 40% of reference evapotranspiration.
criminal
(g) A decision or order issued under this section ~ the Board, or an officer or employee the Board, is subject to reconsideration under article 2 (commencing with section 1122) c chapter 4 of part 1 of division 2 of the Water Code.

Authority: Section 105$.5, Water Code.

References: Article X Section 2 California Constitution' Sections 4080 4100 4110 and 4185 Civil Gode~ Section 8627.7 Government Code' Sections 102 104 105 275 350

3.77, 491, 1058.5, 1122. 10608.12, 10617, 10632, and 10632.1, Water Code; Lic~hf v. Sf~ Water Resources Control Board (2Q14) 226 Cal.App.4th 1463; Stanford Vina Ranch lrrigation Co. v. State of California (20201 50 Cal.App.5th 976

EXECUTIVE DEPARTMENT

STATE OF CALIFORNIA
EXECUTIVE ORDER N-5-23
WHEREAS on April 21, 2021, May 10, 2021, July 8, 2021, and October 19, 2021, I proclaimed States of Emergency to exist due to drought conditions; and WHEREAS the multi-year nature of the current drought, which began three years after the record-setting drought of 2012-2016, continues to have significant, immediate impacts on communities across California with vulnerable water supplies, farms that rely on irrigation to grow food and fiber, and fish and wildlife that rely on stream flows and cool water; and
WHEREAS the March 3, 2023, snow survey conducted by the Department of Water Resources and partner agencies found that most regions of the Sierra Nevada are above average for snow water content, and some regions are nearing record amounts of snow, and snow and rain has fallen across many regions of the state since then, with more precipitation forecasted; and WHEREAS improved conditions have helped rehabilitate surface water supplies, but have not abated the severe drought conditions that remain in some parts of the State, including the Klamath River basin and the Colorado River basin, and many groundwater basins throughout the State remain depleted from overreliance and successive multi-year droughts; and WHEREAS continued action by the State is needed to address ongoing consequences of the drought emergency, including groundwater supply shortages, domestic well failures, and drought-related harm to native fishes in the Klamath River and Clear Lake watersheds; and
WHEREAS the drought emergency has required a dynamic and flexible response from the State, and several provisions in my prior Proclamations and Orders have been terminated or superseded already, specifically Paragraphs 4 and 8 of my State of Emergency Proclamation dated April 21, 202 l, Paragraphs 2, 4, and 7 of my State of Emergency Proclamation dated May 10, 2021, Paragraphs 3, 4, 5, 6, and 10 of my State of Emergency Proclamation dated July 8, 2021, and Paragraph 9 of Executive Order N-7-22; and WHEREAS improved conditions warrant an even more targeted State response to the ongoing drought emergency and certain provisions in my State of Emergency Proclamations dated April 21, 202 l, May 10, 2021, July 8, 2021, and October 19, 2021, and in Executive Orders N-10-21, N-7-22, and N-3-23 provide authority that is no longer needed to mitigate the effects of the drought conditions or direct actions by state agencies, departments, and boards that have already been completed; and
WHEREAS notwithstanding the rescission of certain emergency authorities for emergency drinking water action, state agencies have existing legal authority and funding to continue expedited work to advance the human right to water, and state agencies will continue all ongoing drought resilience planning work, including through coordination with local agencies and tribes; and
WHEREAS next winter's hydrology is uncertain and the most efficient way to preserve the State's improved surface water supplies is for Californians to continue their ongoing efforts to make conservation a way of life; and WHEREAS to protect public health and safety, it is critical the State take certain immediate actions without undue delay to prepare for and mitigate the effects of the drought conditions, and under Government Code section 8571, I find that strict compliance with various statutes and regulations specified in this Order would prevent, hinder, or delay the mitigation of the effects of the drought conditions.

NOW, THEREFORE, I, GAVIN NEWSOM, Governor of the State of California, in accordance with the authority vested in me by the State Constitution and statutes, including the California Emergency Services Act, and in particular, Government Code sections 8567, 8571, and 8627, do hereby issue the following Order to become effective immediately:

IT IS HEREBY ORDERED THAT:
l . The orders and provisions contained in my State of Emergency Proclamations dated April 21, 2021, May 10, 2021, July 8, 2021, and October 19, 2021, and Executive Orders N-7-22 (March 28, 2022), N-3- 23 (February 13, 2023), and N-4-23 (March l 0, 2023), remain in full force and effect, except as modified by those Proclamations and Orders and herein. State agencies shall continue to implement all directions from those Proclamations and Orders and accelerate implementation where feasible.

2. The following provisions of my State of Emergency Proclamation dated April 21, 2021, are terminated:
a. Paragraph 2;
b. Paragraphs 5-7; and
c. Paragraphs 9-14.

3. The following provisions of my State of Emergency Proclamation dated May l 0, 2021, are terminated:
a. Paragraph 1;
b. Paragraph 3;
c. Paragraph 5; and
d. Paragraphs 9-10.

4. The following provisions of my State of Emergency Proclamation dated July 8, 2021, are terminated:
a. Paragraph 2;
b. Paragraphs 7-8, except those portions of paragraph 7 withdrawing provisions of prior orders;
c. Paragraphs 11-12.

5. The following provisions of my State of Emergency Proclamation dated October 19, 2021, are terminated:
a. Paragraph 2;
b. Paragraphs 4-5;
c. Paragraph 8; and
d. Paragraph 10.

6. The following provisions of Executive Order N-10-21 are terminated:
a. Paragraph 1; and
b. Paragraph 3

7. The following provisions of Executive Order N-7-22 are terminated:
a. Paragraphs 1-3;
b. Paragraph 6; and
c. Paragraphs 14-15.

8. The following provisions of Executive Order N-3-23 are terminated:
a. Paragraph 1; and
b. Paragraph 3, except those portions of the paragraph
withdrawing provisions of prior orders.

9. Paragraph 6 of my State of Emergency Proclamation dated May 10, 2021, and Paragraph 9 of my State of Emergency Proclamation dated July 8, 2021, are withdrawn and replaced with the following text:

To ensure critical instream flows for species protection in the Klamath River and Clear Lake watersheds, the State Water Resources Control Board (Water Board) and Department of Fish and Wildlife shall evaluate the minimum instream flows and other actions needed to protect salmon, steelhead, the Clear Lake Hitch, and other native fishes in critical streams systems in these watersheds and work with water users, tribes, and other parties on voluntary measures to implement those actions. To the extent voluntary actions are not sufficient, the Water Board, in coordination with the Department of Fish and Wildlife, shall consider emergency regulations to establish minimum instream flows to mitigate the effects of the drought conditions. For purposes of state agencies carrying out or approving any actions contemplated by this paragraph, Public Resources Code, Division 13 (commencing with Section 21000) and regulations adopted pursuant to that Division are suspended. Nothing in this Paragraph affects or limits the validity of actions already taken in the Klamath and Clear Lake watersheds or ongoing under Paragraph 6 of my State of Emergency Proclamation dated May 10, 2021, or Paragraph 9 of my State of Emergency Proclamation dated July 8, 2021 .

IT IS FURTHER ORDERED that as soon as hereafter possible, this Order be filed in the Office of the Secretary of State and that widespread publicity and notice be given of this Order.

This Order is not intended to, and does not, create any rights or benefits, substantive or procedural, enforceable at law or in equity, against the State of California, its agencies, departments, entities, officers, employees, or any other person.

IN WITNESS WHEREOF I have hereunto set
my hand and caused the Great Seal of the
State of California to be affixed this 24th
day of March 2023.
overnor of California
ATTEST:

SHIRLEY N. WEBER, PH.D.

Secretary of State

DRINKING WATER CONSTRUCTION
LOAN
AGREEMENT NO. SWRCB0000000000D2002017
by and between
CITY OF PORTERVILLE (“Recipient”)
and
CALIFORNIA STATE WATER RESOURCES CONTROL BOARD (“State Water Board”) for the purpose of the

AKIN/CENTRAL WATER CONSOLIDATION PROJECT
5410010-018C AND 5400655-001C (“Project”)
• Section 116760 et seq. of the Health and Safety Code and Resolution Nos. 2019-0065 and 2020- 0022.

PROJECT FUNDING AMOUNT: $4,787,664
PRINCIPAL FORGIVENESS COMPONENT: $4,787,664
ESTIMATED REASONABLE PROJECT COST: $4,787,664
ELIGIBLE WORK START DATE: JULY 1, 2016
ELIGIBLE CONSTRUCTION START DATE: SEPTEMBER 22, 2020
CONSTRUCTION COMPLETION DATE: OCTOBER 1, 2023
FINAL REIMBURSEMENT REQUEST DATE: APRIL 1, 2024
RECORDS RETENTION END DATE: OCTOBER 1, 2059
City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 2 of 24 ends

3pg18xi20

1. The State Water Board and the Recipient mutually promise, covenant, and agree to the terms, provisions, and conditions of this Agreement, including the following Exhibits, which are attached hereto or are incorporated by reference:
• Exhibit A – Scope of Work and Schedule
• Exhibit B – Specific Funding Provisions
• Exhibit C – GENERAL TERMS AND CONDITIONS 2019-NOV
• Exhibit D – Special Conditions

2. The following documents are also incorporated by reference:
• the Drinking Water System Permit No. 03-12-06P-004;
• the Davis-Bacon requirements found at:
https://www.waterboards.ca.gov/water_issues/programs/grants_loans/srf/docs/davisbacon/2020_ dwsrf_governmental_entities.pdf

3. Party Contacts during the term of this Agreement are:

State Water Board City of Porterville
Section: Division of Financial Assistance
Name: Pete Stamas, Project Manager Name: Monte Reyes, Mayor Address: 1001 I Street, 16th Floor Address: 291 North Main Street City, State,
Zip:

Sacramento, CA 95814 City, State, Zip: Porterville, CA 93257 Phone: (916) 552-9983 Phone: (559) 782-7499
Fax: Fax:

Email: [email protected] Email: [email protected] Each party may change its contact upon written notice to the other party. While Party Contacts are contacts for day-to-day communications regarding Project work, the Recipient must provide official communications and notices to the Division’s Deputy Director.

4. Conditions precedent to this Agreement are set forth as follows:
(a) The Recipient must deliver an opinion of general counsel satisfactory to the State Water Board’s counsel dated on or after the date that the Recipient signs this Agreement. (b) The Recipient must deliver to the Division a resolution authorizing this Agreement and identifying its authorized representative by title.
(c) The Recipient must deliver to the Division a resolution certifying that its decision-making body reviewed and considered the Mitigated Negative Declaration filed by the State Water Board for the Akin Water Company Water Supply Project together with the Mitigation Monitoring and Reporting Program and reached its own conclusions on whether and how to approve the Project, pursuant to Section 15050 (b) of the CEQA Guidelines.

5. The Recipient represents, warrants, and commits to the following as of the Eligible Work Start Date and continuing thereafter for the term of this Agreement, which shall be at least until the Records Retention End Date:
(a) The Recipient agrees to comply with all terms, provisions, conditions, and commitments of this Agreement, including all incorporated documents.
(b) The execution and delivery of this Agreement, including all incorporated documents, has been duly authorized by the Recipient. Upon execution by both parties, this Agreement constitutes a valid and binding obligation of the Recipient, enforceable in accordance with its terms, except as such enforcement may be limited by law.

City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 3 of 24 ends

3pg18xi20
(c) None of the transactions contemplated by this Agreement will be or have been made with an actual intent to hinder, delay, or defraud any present or future creditors of Recipient. The Recipient is solvent and will not be rendered insolvent by the transactions contemplated by this Agreement. The Recipient is able to pay its debts as they become due. The Recipient maintains sufficient insurance coverage considering the scope of this Agreement, including, for example but not necessarily limited to, general liability, automobile liability, workers compensation and employer liability, professional liability. (d) The Recipient is in compliance with all State Water Board funding agreements to which it is a party.

City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 5 of 24 ends

Exhibit A
EXHIBIT A – SCOPE OF WORK AND SCHEDULE
A.1. PROJECT PURPOSE AND DESCRIPTION.

The Project is for the benefit of the Recipient and has a Useful Life of at least 40 years. The funding under this Agreement shall be used to provide the residents of two small disadvantaged communities currently served by Akin Water Company (Akin WC) and Central Mutual Water Company (Central MWC) with a sustainable source of safe drinking water.

A.2. SCOPE OF WORK.

The Recipient agrees to do the following: consolidate with Akin WC and Central MWC. Recipient also agrees to construct a new production well, estimated to produce between 1,300 and 1,800 gallons per minute, to provide the needed source capacity for the consolidation of Akin WC, the consolidation of Central MWC, as well as satisfy the remainder of East Porterville residents’ capacity needs.

The Recipient agrees to do the following for the Akin WC service area: construct approximately 1,500 feet of 8-inch waterline to provide water service to each customer currently served by Akin WC; install approximately three new fire hydrants and twenty-six new service laterals and meters; and destroy Akin WC’s two existing wells.

The Recipient agrees to do the following for the Central MWC service area: construct approximately 1,400 feet of 6-inch waterline to provide water service to each customer currently served by Central MWC; install approximately four new fire hydrants and thirty-four new service laterals and meters; and destroy Central MWC’s existing well.

Upon Completion of Construction, the Recipient must expeditiously initiate Project operations.

A.3 SIGNAGE
The Recipient must place a professionally prepared sign at least four feet tall by eight feet wide made of ¾ inch thick exterior grade plywood or other approved material in a prominent location on the Project site and must maintain the sign in good condition for the duration of Project implementation. The sign may include another agency’s required information and must include, prominently displayed, the following disclosure statement and color logos (available from the Division):

“Funding for this project has been provided in full or in part under the Drinking Water State Revolving Fund, which may include capitalization funding from the United States Environmental Protection Agency through an agreement with the State Water Resources Control Board.” A.4 SCHEDULE.

Failure to provide items by the due dates indicated in the table below may constitute a material violation of this Agreement. The Project Manager may adjust the dates in the “Estimated Due Date” column of this table, but Critical Due Date adjustments will require an amendment to this Agreement. The Recipient City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 6 of 24 ends

Exhibit A
must complete and submit all work in time to be approved by the Division prior to the Project Completion Date. As applicable for specific submittals, the Recipient must plan adequate time to solicit, receive, and address comments prior to submitting the final submittal. The Recipient must submit the final Reimbursement Request prior to the Final Reimbursement Request Date set forth on the Cover Page.

ITEM DESCRIPTION OF SUBMITTAL CRITICAL DUE
DATE

ESTIMATED DUE
DATE
EXHIBIT A – SCOPE OF WORK
A. ADDITIONAL SUBMITTAL(S) TO DIVISION

1. Final Plans and Specifications September 1, 2021

2. Final Budget Approval Package February 1, 2022

3. Completion of Construction October 1, 2023
B. REPORTS

1. Progress Reports Quarterly

2. Final Inspection and Certification October 1, 2023

3. Project Completion Report December 1, 2023
4 As Needed Reports TBD
EXHIBIT B – REIMBURSEMENTS, BUDGET DETAIL, AND REPORTING PROVISIONS A. REIMBURSEMENTS

1. Reimbursement Requests Quarterly

2. Final Reimbursement Request April 1, 2024
The Recipient must award the prime construction contract and begin construction timely. The Recipient must deliver any request for extension of the Completion of Construction Date no less than 90 days prior to the Completion of Construction Date.

A.5 PROGRESS REPORTS.

The Recipient must provide a progress report to the Division each quarter, beginning no later than 90 days after execution of this Agreement. The Recipient must provide a progress report with each Reimbursement Request. Failure to provide a complete and accurate progress report may result in the withholding of Project Funds, as set forth in Exhibit B. A progress report must contain the following information:
1) A summary of progress to date including a description of progress since the last report, percent construction complete, percent contractor invoiced, and percent schedule elapsed;
2) A description of compliance with environmental requirements; 3) A listing of change orders including amount, description of work, and change in contract amount and schedule; and
4) Any problems encountered, proposed resolution, schedule for resolution, and status of previous problem resolutions.

City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 7 of 24 ends

Exhibit A
A.6 SPECIAL REPORTS.
(a) The Recipient must submit a Project Completion Report to the Division with a copy to the appropriate District Office on or before the due date established by the Division and the Recipient at the time of final project inspection. The Project Completion Report must include the following:
i. Description of the Project,
ii. Description of the water quality problem the Project sought to address, iii. Discussion of the Project’s likelihood of successfully addressing that water quality problem in the future, and
iv. Summary of compliance with applicable environmental conditions. (b) If the Recipient fails to submit a timely Project Completion Report, the State Water Board may stop processing pending or future applications for new financial assistance, withhold reimbursements under this Agreement or other agreements, and begin administrative proceedings.
(c) The Recipient must report Disadvantaged Business Enterprise (DBE) utilization to the Division on the DBE Utilization Report, State Water Board Form DBE UR334. The Recipient must submit such reports to the Division annually within ten (10) calendar days following October 1 until such time as the "Notice of Completion" is issued. The Recipient must comply with 40 CFR § 33.301 and require its contractors and subcontractors on the Project to comply.

A.7 FINAL PROJECT INSPECTION AND CERTIFICATION.

Upon completion of the Project, the Recipient must provide for a final inspection and must certify that the Project has been completed in accordance with this Agreement, any final plans and specifications submitted to the State Water Board, and any amendments or modifications thereto. If the Project involves the planning, investigation, evaluation, design, or other work requiring interpretation and proper application of engineering, or other professionals, the final inspection and certification must be conducted by a California Registered Civil Engineer or other appropriate California registered professional. The results of the final inspection and certification must be submitted to the Project Manager.

City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 8 of 24 ends

Exhibit B
EXHIBIT B – FUNDING AMOUNTS
B.1 ESTIMATED REASONABLE COST AND PROJECT FUNDS.

The estimated reasonable cost of the total Project is set forth on the Cover Page of this Agreement and is greater than or equal to the funding anticipated to be provided by the State Water Board under this Agreement. Subject to the terms of this Agreement, the State Water Board agrees to provide Project Funds not to exceed the amount of the Project Funding Amount set forth on the Cover Page of this Agreement.

B.2 RECIPIENT CONTRIBUTIONS.
(a) The loan component of this Agreement is forgiven. The estimated amount of principal that will be due to the State Water Board from the Recipient under this Agreement is Zero dollars and no cents ($0.00). (b) The Recipient must pay any and all costs connected with the Project including, without limitation, any and all Project Costs. If the Project Funds are not sufficient to pay the Project Costs in full, the Recipient must nonetheless complete the Project and pay that portion of the Project Costs in excess of available Project Funds, and shall not be entitled to any reimbursement therefor from the State Water Board. (c) If the Recipient recovers funds from any responsible parties, the Recipient shall immediately notify the Division. The amount of this Agreement may be reduced to reflect the recovered funds.

B.3 VERIFIABLE DATA.

Upon request by the Division, the Recipient must submit verifiable data to support deliverables specified in the Scope of Work. The Recipient’s failure to comply with this requirement may be construed as a material breach of this Agreement.

B.4 BUDGET COSTS
Budget costs are contained in the Summary Project Cost Table below:

LINE ITEM TOTAL ESTIMATED COST PROJECT FUNDING AMOUNT
Construction $3,194,720 $3,194,720
Pre-Purchased Material/Equipment $0 $0
Purchase of Land $0 $0
Contingency $638,944 $638,944
Allowances (Soft Costs) $954,000 $954,000
TOTAL $4,787,664 $4,787,664

The Division’s Final Budget Approval and related Form 259 and Form 260 will document a more detailed budget of eligible Project Costs and Project funding amounts.

The Recipient is prohibited from requesting disbursement amounts that represent Recipient’s mark-ups to costs invoiced or otherwise requested by consultants or contractors.

Reasonable indirect costs may be allowable upon approval by the Division.

B.5 LINE ITEM ADJUSTMENTS.

Upon written request by the Recipient, the Division may adjust the line items of the Summary Project Cost Table at the time of Division’s Final Budget Approval. Upon written request by the Recipient, the Division may also adjust the line items of the Summary Project Cost Table as well as the detailed budget at the time of Recipient’s submittal of its final claim. Any line item adjustments to the Summary Project Cost Table that are due to a change in scope of work will require an Agreement amendment. The sum of adjusted line items in both the Summary City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 9 of 24 ends

Exhibit B
Project Cost Table and the detailed budget must not exceed the Project Funding Amount. The Division may also propose budget adjustments.

Under no circumstances may the sum of line items in the budget approved through the Final Budget Approval process exceed the Project Funding Amount. Any increase in the Project Funding Amount will require an Agreement amendment.

B.6 REIMBURSEMENT PROCEDURE.
(a) Except as may be otherwise provided in this Agreement, reimbursements will be made as follows:

1. Upon execution and delivery of this Agreement by both parties, the Recipient may request immediate reimbursement of any eligible incurred costs as specified below through submission to the State Water Board of the Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed.

2. The Recipient must submit a Reimbursement Request for costs incurred prior to the date this Agreement is executed by the State Water Board no later than ninety (90) days after this Agreement is executed by the State Water Board. Late Reimbursement Requests may not be honored.

3. Additional Project Funds will be promptly disbursed to the Recipient upon receipt of Reimbursement Request Form 260 and Form 261, or any amendment thereto, duly completed and executed by the Recipient for incurred costs consistent with this Agreement, along with receipt of progress reports due under Exhibit A.

4. The Recipient must not request reimbursement for any Project Cost until such cost has been incurred and is currently due and payable by the Recipient, although the actual payment of such cost by the Recipient is not required as a condition of reimbursement. Supporting documentation (e.g., receipts) must be submitted with each Reimbursement Request. The amount requested for Recipient’s administration costs must include a calculation formula (i.e., hours or days worked times the hourly or daily rate = total amount claimed). Reimbursement of Project Funds will be made only after receipt of a complete, adequately supported, properly documented, and accurately addressed Reimbursement Request. Upon request by the Division, supporting documents for professional and administrative services must include the employees’ names, classifications, labor rates, hours worked, and descriptions of the tasks performed.

Reimbursement Requests submitted without supporting documents may be wholly or partially withheld at the discretion of the Division.

5. The Recipient must spend Project Funds within 30 days of receipt. If the Recipient earns interest earned on Project Funds, it must report that interest immediately to the State Water Board. The State Water Board may deduct earned interest from future reimbursements.

6. The Recipient shall not request a reimbursement unless that Project Cost is allowable, reasonable, and allocable.

7. Notwithstanding any other provision of this Agreement, no reimbursement shall be required at any time or in any manner which is in violation of or in conflict with federal or state laws, policies, or regulations. (b) Notwithstanding any other provision of this Agreement, the Recipient agrees that the State Water Board may retain an amount equal to ten percent (10%) of the Project Funding Amount until Project Completion. Any retained amounts due to the Recipient will be promptly disbursed to the Recipient, without interest, upon Project Completion.
(c) Except as follows, construction costs and disbursements are not available until after the Division has approved the final budget form submitted by the Recipient. The Deputy Director of the Division may authorize the disbursement of up to ten percent (10%) of Project Funds for the reimbursement of eligible construction costs and pre-purchased materials prior to Division approval of the final budget form submitted by the Recipient. All other construction costs are not eligible for reimbursement until after this the Division has approved the final budget form submitted by the Recipient. Construction costs incurred prior to the Eligible Construction Start Date are not eligible for reimbursement.

B.7 REVERTING FUNDS AND DISENCUMBRANCE.

City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 10 of 24 ends

Exhibit B
In the event the Recipient does not submit Reimbursement Requests for all funds encumbered under this Agreement by the Final Reimbursement Request Date, any remaining funds revert to the State. The State Water Board may notify the Recipient that the project file is closed, and any remaining balance will be disencumbered and unavailable for further use under the Agreement.

City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 11 of 24 ends

Exhibit C
EXHIBIT C – GENERAL TERMS AND CONDITIONS 2019-NOV
GENERAL TERMS AND CONDITIONS 2019-NOV is incorporated by reference and is posted at https://www.waterboards.ca.gov/water_issues/programs/grants_loans/general_terms.html City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 12 of 24 ends

Exhibit D
EXHIBIT D – SPECIAL CONDITIONS

1. Notwithstanding Exhibit C, the following terms have no meaning for the purposes of this Agreement:
• Work Completion
• Work Completion Date

2. Each capitalized term used in this Agreement has the following meaning:
• "Allowance" means an amount based on a percentage of the accepted bid for an eligible project to help defray the planning, design, and construction engineering and administration costs of the Project. • "Authorized Representative" means the duly appointed representative of the Recipient as set forth in the certified original of the Recipient’s authorizing resolution that designates the authorized representative by title.
• "Completion of Construction" means the date, as determined by the Division after consultation with the Recipient, that the work of building and erection of the Project is substantially complete, and is established on the Cover Page of this Agreement.
• “District Office” means District Office of the Division of Drinking Water of the State Water Board. • “Division of Drinking Water” means the Division of Drinking Water of the State Water Board. • “Eligible Construction Start Date” means the date set forth on the Cover Page of this Agreement, establishing the date on or after which construction costs may be incurred and eligible for reimbursement hereunder.
• “Eligible Work Start Date” means the date set forth on the Cover Page of this Agreement, establishing the date on or after which any non-construction costs may be incurred and eligible for reimbursement hereunder.
• “Enterprise Fund” means the enterprise fund of the Recipient in which Revenues are deposited. • “Event of Default” means, in addition to the meanings set forth in Exhibit C, the occurrence of any of the following events:
a) A material adverse change in the condition of the Recipient, the Revenues, or the System, which the Division reasonably determines would materially impair the Recipient’s ability to satisfy its obligations under this Agreement.
b) Failure to operate the System or the Project without the Division’s approval; • “Final Budget Approval” means the Division-approved final budget for the Project, as set forth in Exhibit B. • “Indirect Costs” means those costs that are incurred for a common or joint purpose benefiting more than one cost objective and are not readily assignable to the Project (i.e., costs that are not directly related to the Project). Examples of Indirect Costs include, but are not limited to: central service costs; general administration of the Recipient; non-project-specific accounting and personnel services performed within the Recipient organization; depreciation or use allowances on buildings and equipment; the costs of operating and maintaining non-project-specific facilities; tuition and conference fees; generic overhead or markup; and taxes.
• "Initiation of Construction" means the date that notice to proceed with work is issued for the Project, or, if notice to proceed is not required, the date of commencement of building and erection of the Project. • “Net Revenues" means, for any Fiscal Year, all Revenues received by the Recipient less the Operations and Maintenance Costs for such Fiscal Year.
• "Operations and Maintenance Costs" means the reasonable and necessary costs paid or incurred by the Recipient for maintaining and operating the System, determined in accordance with GAAP, including all City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 13 of 24 ends

Exhibit D
reasonable expenses of management and repair and all other expenses necessary to maintain and preserve the System in good repair and working order, and including all reasonable and necessary administrative costs of the Recipient that are charged directly or apportioned to the operation of the System, such as salaries and wages of employees, overhead, taxes (if any), the cost of permits, licenses, and charges to operate the System and insurance premiums; but excluding, in all cases depreciation, replacement, and obsolescence charges or reserves therefor and amortization of intangibles. • “Reimbursement Request” means the Recipient’s request for Project Funds from the State Water Board as set forth in Exhibit B.
• "Revenues" means, for each Fiscal Year, all gross income and revenue received or receivable by the Recipient from the ownership or operation of the System, determined in accordance with GAAP, including all rates, fees, and charges (including connection fees and charges) as received by the Recipient for the services of the System, and all other income and revenue howsoever derived by the Recipient from the ownership or operation of the System or arising from the System, including all income from the deposit or investment of any money in the Enterprise Fund or any rate stabilization fund of the Recipient or held on the Recipient’s behalf, and any refundable deposits made to establish credit, and advances or contributions in aid of construction.
• “System” means all drinking water collection, transport, treatment, storage, and delivery facilities, including land and easements thereof, owned by the City of Porterville, or its successor agency, and all other properties, structures, or works hereafter acquired and constructed by the Recipient and determined to be a part of the System, together with all additions, betterments, extensions, or improvements to such facilities, properties, structures, or works, or any part thereof hereafter acquired and constructed. • “Useful Life” means the economically useful life of the Project beginning at Project Completion and is set forth in Exhibit A.

3. Acknowledgements.

The Recipient must include the following acknowledgement in any document, written report, or brochure to be shared with the general public prepared in whole or in part pursuant to this Agreement:
“Funding for this project has been provided in full or in part under the Drinking Water State Revolving Fund, which may include capitalization funding from the United States Environmental Protection Agency through an agreement with the State Water Resources Control Board. The contents of this document do not necessarily reflect the views and policies of the foregoing, nor does mention of trade names or commercial products constitute endorsement or recommendation for use.”

4. Rates and Charges. The Recipient must, to the extent permitted by law, fix, prescribe and collect rates, fees and charges for the System during each Fiscal Year which are reasonable, fair, and nondiscriminatory and which will be sufficient to generate Revenues in the amounts necessary to cover Operations and Maintenance Costs, and must ensure that Net Revenues are in an amount necessary to meet its obligations under this Agreement. The Recipient may make adjustments from time to time in such fees and charges and may make such classification thereof as it deems necessary, but shall not reduce the rates, fees and charges then in effect unless the Net Revenues from such reduced rates, fees, and charges will at all times be sufficient to meet the requirements of this section.

5. [RESERVED]

6. [RESERVED].

City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 14 of 24 ends

Exhibit D

7. Environmental/Technical Special Conditions
Technical:

1. The Recipient shall submit its professional engineering services contract to the Division prior to disbursement of funds for costs incurred under such contract.

2. The Recipient shall not solicit bids, award a contract, or commence construction activities until final plans and specifications are approved by the Division of Drinking Water Tulare District Office Engineer and the Project Manager.

3. The Recipient must submit final consolidation agreements with Akin WC and Central MWC, in a form satisfactory to the Division, and receive written approval from the Project Manager to proceed before Project Funds may be disbursed for any Project Costs under the Agreement.

4. Upon completion of the Project the Recipient shall submit a water supply permit amendment request for review to the Division of Drinking Water Tulare District Office.

Environmental:

1. The documents identified below are incorporated by reference and the Recipient shall comply with the conditions and recommendations therein:
a. The Mitigation Monitoring and Reporting Program adopted by the State Water Board on June 16, 2016 for the Project. The Recipient shall implement all mitigation measures therein. b. The letter dated February 12, 2020, from Patricia Cole of the United States Fish and Wildlife Service, San Joaquin Valley Division to Douglas E. Eberhardt of the United States Environmental Protection Agency, including, but not limited to, the following:
i. Implement Avoidance and Minimization Measures and Best Management Practices prior to and during construction activities to minimize and avoid effects to the San Joaquin kit fox.
c. The Mitigation Monitoring and Reporting Program adopted by the City of Porterville on April 21, 2020 for the Central Mutual Water Company Consolidation Project. The Recipient shall implement all mitigation measures therein.

2. In the Recipient’s Quarterly Reports submitted pursuant to this Agreement, the Recipient shall include a discussion of the status of its compliance with environmental measures identified in this Exhibit D, with separate sections clearly labeled and titled, discussing the status of Recipient’s compliance.

3. In the Recipient’s Project Completion Report submitted pursuant to this Agreement, the Recipient shall include a discussion of its compliance with environmental measures identified in this Exhibit D, with separate sections clearly labeled and titled, discussing the status of Recipient’s compliance.

8. [RESERVED].

9. Appointment of Receiver/Custodian. Upon the filing of a suit or other commencement of judicial proceedings to enforce the rights of the State Water Board under this Agreement, the State Water Board may make application for the appointment of a receiver or custodian of the Revenues, pending such proceeding, with such power as the court making such appointment may confer.

10. [RESERVED].

11. Damages for Breach of Federal Conditions. In the event that any breach of any of the provisions of this Agreement by the Recipient results in the failure of Project Funds to be used pursuant to the provisions of this Agreement, or if such breach results in an obligation on the part of the State or any subdivision or agency thereof to reimburse the federal government, the Recipient must immediately reimburse the State or any subdivision or agency thereof in an amount equal to any damages paid by or loss incurred by the State or any subdivision or agency thereof due to such breach.

City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 15 of 24 ends

Exhibit D

12. [RESERVED].

13. Operation and Maintenance. The Recipient shall sufficiently and properly staff, operate, and maintain the facility and structures constructed or improved as part of the project throughout the term of this Agreement, consistent with the purposes of this Agreement. The Recipient assumes all operations and maintenance costs of the facilities and structures; the State Water Board shall not be liable for any cost of such maintenance, management or operation.

14. Insurance. The Recipient will procure and maintain or cause to be maintained insurance on the System and Project with responsible insurers, or as part of a reasonable system of self-insurance, in such amounts and against such risks (including damage to or destruction of the System or Project) as are usually covered in connection with systems similar to the System or Project. Such insurance may be maintained by a self-insurance plan so long as such plan provides for (i) the establishment by the Recipient of a separate segregated self-insurance fund in an amount determined (initially and on at least an annual basis) by an independent insurance consultant experienced in the field of risk management employing accepted actuarial techniques and (ii) the establishment and maintenance of a claims processing and risk management program. In the event of any damage to or destruction of the System or Project caused by the perils covered by such insurance, the net proceeds thereof shall be applied to the reconstruction, repair or replacement of the damaged or destroyed portion of the System or Project. The Recipient must begin such reconstruction, repair or replacement as expeditiously as possible, and must pay out of such net proceeds all costs and expenses in connection with such reconstruction, repair or replacement so that the same must be completed and the System and Project must be free and clear of all claims and liens. Recipient agrees that for any policy of insurance concerning or covering the construction of the Project, it will cause, and will require its contractors and subcontractors to cause, a certificate of insurance to be issued showing the State Water Board, its officers, agents, employees, and servants as additional insured; and must provide the Division with a copy of all such certificates prior to the commencement of construction of the Project.

15. Notice Events. Upon the occurrence of any of the following events, the Recipient must notify the Division’s Deputy Director and Party Contacts by phone and email within the time specified below:
a. The Recipient must notify the Division within 24 hours by phone at (916) 327-9978 and by email to [email protected] of any discovery of any potential tribal cultural resource and/or archaeological or historical resource. Should a potential tribal cultural resource and/or archaeological or historical resource be discovered during construction or Project implementation, the Recipient must ensure that all work in the area of the find will cease until a qualified archaeologist has evaluated the situation and made recommendations regarding preservation of the resource, and the Division has determined what actions should be taken to protect and preserve the resource. The Recipient must implement appropriate actions as directed by the Division.
b. The Recipient must notify the Division promptly of the occurrence of any of the following events:
i. Bankruptcy, insolvency, receivership or similar event of the Recipient, or actions taken in anticipation of any of the foregoing;
ii. Change of ownership of the Project (no change of ownership may occur without written consent of the Division);
iii. Loss, theft, damage, or impairment to Project;
iv. Events of Default, except as otherwise set forth in this section; City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 16 of 24 ends

Exhibit D
v. A proceeding or action by a public entity to acquire the Project by power of eminent domain.
vi. Any litigation pending or threatened with respect to the Project or the Recipient’s technical, managerial or financial capacity or the Recipient’s continued existence; vii. Consideration of dissolution, or disincorporation; viii. Enforcement actions by or brought on behalf of the State Water Board or Regional Water Board.
ix. The discovery of a false statement of fact or representation made in this Agreement or in the application to the Division for this funding, or in any certification, report, or request for reimbursement made pursuant to this Agreement, by the Recipient, its employees, agents, or contractors;
x. Any substantial change in scope of the Project. The Recipient must undertake no substantial change in the scope of the Project until prompt written notice of the proposed change has been provided to the Division and the Division has given written approval for the change;
xi. Any circumstance, combination of circumstances, or condition, which is expected to or does delay Completion of Construction for a period of ninety (90) days or more; xii. Any Project monitoring, demonstration, or other implementation activities required in this Agreement;
xiii. Any public or media event publicizing the accomplishments and/or results of this Agreement and provide the opportunity for attendance and participation by state representatives with at least ten (10) working days’ notice to the Division; xiv. Any event requiring notice to the Division pursuant to any other provision of this Agreement.
xv. Completion of work on the Project.
xvi. The Recipient must promptly notify the Division and Party Contacts of cessation of all major construction work on the Project where such cessation of work is expected to or does extend for a period of thirty (30) days or more;
xvii. The Recipient must promptly notify the Division and Party Contacts of the discovery of any unexpected endangered or threatened species, as defined in the federal Endangered Species Act. Should a federally protected species be unexpectedly encountered during implementation of the Project, the Recipient agrees to promptly notify the Division. This notification is in addition to the Recipient’s obligations under the federal Endangered Species Act;
xviii. The Recipient must promptly notify the Division and Party Contacts of Completion of Construction, and Project Completion;
xix. The Recipient must promptly notify the Division and Party Contacts of the award of the prime construction contract for the Project; and the Recipient must promptly notify the Division and Party Contacts of Initiation of construction of the Project.

City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 17 of 24 ends

Exhibit D
xx. The occurrence of a material breach or event of default under any Recipient obligation that results in the acceleration of principal or interest or otherwise requires immediate prepayment, repurchase or redemption.
xxi. [RESERVED].

16. Continuous Use of Project; No Lease, Sale, Transfer of Ownership, or Disposal of Project. The Recipient agrees that, except as provided in this Agreement, it will not abandon, substantially discontinue use of, lease, sell, transfer ownership of, or dispose of all or a significant part or portion of the Project during the Useful Life of the Project without prior written approval of the Division. Such approval may be conditioned as determined to be appropriate by the Division, including a condition requiring repayment of all disbursed Project Funds or all or any portion of all remaining funds covered by this Agreement together with accrued interest and any penalty assessments that may be due.

17. State Cross-Cutters. Recipient represents that, as applicable, it complies and covenants to maintain compliance with the following for the term of the Agreement:
a) The California Environmental Quality Act (CEQA), as set forth in Public Resources Code 21000 et seq. and in the CEQA Guidelines at Title 14, Division 6, Chapter 3, Section 15000 et seq. b) Water Conservation requirements, including regulations in Division 3 of Title 23 of the California Code of Regulations.
c) Monthly Water Diversion Reporting requirements, including requirements set forth in Water Code section 5103.
d) Public Works Contractor Registration with Department of Industrial Relations requirements, including requirements set forth in Sections 1725.5 and 1771.1 of the Labor Code. e) Volumetric Pricing & Water Meters requirements, including the requirements of Water Code sections 526 and 527.
f) Urban Water Management Plan requirements, including the Urban Water Management Planning Act (Water Code, § 10610 et seq.).
g) Urban Water Demand Management requirements, including the requirements of Section 10608.56 of the Water Code.
h) Delta Plan Consistency Findings requirements, including the requirements of Water Code section 85225 and California Code of Regulations, title 23, section 5002. i) Agricultural Water Management Plan Consistency requirements, including the requirements of Water Code section 10852.
j) Charter City Project Labor Requirements, including the requirements of Labor Code section 1782 and Public Contract Code section 2503.
k) The Recipient agrees that it will, at all times, comply with and require its contractors and subcontractors to comply with directives or orders issued pursuant to Division 7 of the Water Code.

18. Financial Management Systems. The Recipient must comply with federal standards for financial management systems. The Recipient agrees that, at a minimum, its fiscal control and accounting procedures will be sufficient to permit preparation of reports required by the federal government and tracking of Project funds to a level of expenditure adequate to establish that such funds have not been City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 18 of 24 ends

Exhibit D
used in violation of federal or state law or the terms of this Agreement. To the extent applicable, the Recipient is bound by, and must comply with, the provisions and requirements of the federal Single Audit Act of 1984 and 2 CFR Part 200, subpart F, and updates or revisions, thereto.

19. Access and Inspection. In addition to the obligations set forth in section 2 of the General Terms and Conditions incorporated in Exhibit C of this Agreement, the Recipient must ensure that the United States Environmental Protection Agency, the Office of Inspector General, any member of Congress, or any authorized representative of the foregoing, will have safe and suitable access to the Project site at all reasonable times during the term of the Agreement.

20. Fraud, Waste, and Abuse. The Recipient shall prevent fraud, waste, and the abuse of Project Funds, and shall cooperate in any investigation of such activities that are suspected in connection with this Agreement. The Recipient understands that discovery of any evidence of misrepresentation or fraud related to reimbursement requests, invoices, proof of payment of invoices, or other supporting information, including but not limited to double or multiple billing for time, services, or any other eligible cost, may result in referral to the Attorney General’s Office or the applicable District Attorney’s Office for appropriate action. The Recipient further understands that any suspected occurrences of false claims, misrepresentation, fraud, forgery, theft or any other misuse of Project Funds may result in withholding of reimbursements and/or the termination of this Agreement requiring the immediate repayment of all funds disbursed hereunder.

21. Disputes. The Recipient must continue with the responsibilities under this Agreement during any dispute.

The Recipient may, in writing, appeal a staff decision within 30 days to the Deputy Director of the Division or designee, for a final Division decision. The Recipient may appeal a final Division decision to the State Water Board within 30 days. The Office of the Chief Counsel of the State Water Board will prepare a summary of the dispute and make recommendations relative to its final resolution, which will be provided to the State Water Board’s Executive Director and each State Water Board Member. Upon the motion of any State Water Board Member, the State Water Board will review and resolve the dispute in the manner determined by the State Water Board. Should the State Water Board determine not to review the final Division decision, this decision will represent a final agency action on the dispute. This provision does not preclude consideration of legal questions, provided that nothing herein shall be construed to make final the decision of the State Water Board, or any official or representative thereof, on any question of law.

This section relating to disputes does not establish an exclusive procedure for resolving claims within the meaning of Government Code sections 930 and 930.4.

22. Additional Representations and Warranties. The Recipient makes the following representations and warranties:
a. [RESERVED].
b. The Recipient has not made any untrue statement of a material fact in its application for this financial assistance, or omitted to state in its application, a material fact that makes the statements in its application not misleading.
c. The Recipient agrees to fulfill all assurances, declarations, representations, and commitments in its application, accompanying documents, and communications filed in support of its request for funding under this Agreement.
d. The execution, delivery, and performance by Recipient of this Agreement, including all incorporated documents, do not violate any provision of any law or regulation in effect as of the date set forth on the first page hereof, or result in any breach or default under any contract, obligation, indenture, or other instrument to which Recipient is a party or by which Recipient is bound as of the date set forth on the Cover Page.

City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 19 of 24 ends

Exhibit D
e. Except as set forth in this paragraph, there are, as of the date of execution of this Agreement by the Recipient, no pending or, to Recipient’s knowledge, threatened actions, claims, investigations, suits, or proceedings before any governmental authority, court, or administrative agency which materially affect the financial condition or operations of the Recipient, the Revenues, and/or the Project.
f. There are no proceedings, actions, or offers by a public entity to acquire by purchase or the power of eminent domain any of the real or personal property related to or necessary for the Project.
g. The Recipient is duly organized and existing and in good standing under the laws of the State of California. Recipient must at all times maintain its current legal existence and preserve and keep in full force and effect its legal rights and authority. Within the preceding ten years, the Recipient has not failed to demonstrate compliance with state or federal audit disallowances. h. Any financial statements or other financial documentation of Recipient previously delivered to the State Water Board as of the date(s) set forth in such financial statements or other financial documentation: (a) are materially complete and correct; (b) present fairly the financial condition of the Recipient; and (c) have been prepared in accordance with GAAP. Since the date(s) of such financial statements or other financial documentation, there has been no material adverse change in the financial condition of the Recipient, nor have any assets or properties reflected on such financial statements or other financial documentation been sold, transferred, assigned, mortgaged, pledged or encumbered, except as previously disclosed in writing by Recipient and approved in writing by the State Water Board.
i. The Recipient is current in its continuing disclosure obligations associated with its material debt, if any.
j. The Recipient has no conflicting or material obligations, except as set forth in this paragraph. k. The Recipient legally possesses all real property rights necessary for the purposes of this Agreement, not subject to third party revocation, which rights extend at least to the Records Retention End Date of this Agreement, except as set forth in this paragraph. l. The Recipient and its principals, to the best of the Recipient’s knowledge and belief, are not presently debarred, suspended, proposed for debarment, declared ineligible, or otherwise excluded from participation in any work overseen, directed, funded, or administered by the State Water Board program for which this grant funding is authorized; nor have they engaged or permitted the performance of services covered by this Agreement from parties that are debarred or suspended or otherwise excluded from or ineligible for participation in any work overseen, directed, funded, or administered by the State Water Board program for which this grant funding is authorized.
m. The Recipient possesses all water rights necessary for this Project.

23. Federal SRF Requirements. The Recipient acknowledges, warrants compliance with, and covenants to continuing compliance with the following federal terms and conditions for the Useful Life of the Project:
a. Unless the Recipient has obtained a waiver from USEPA on file with the State Water Board or unless this Project is not a project for the construction, alteration, maintenance or repair of a public water system or treatment work, the Recipient shall not purchase “iron and steel products” produced outside of the United States on this Project. Unless the Recipient has obtained a waiver from USEPA on file with the State Water Board or unless this Project is not a project for the construction, alteration, maintenance or repair of a public water system or treatment work, the City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 20 of 24 ends

Exhibit D
Recipient hereby certifies that all “iron and steel products” used in the Project were or will be produced in the United States. For purposes of this section, the term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. “Steel” means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.
b. The Recipient must include in full the Wage Rate Requirements (Davis-Bacon) language incorporated by reference in Section 2 of this Agreement in all construction contracts and subcontracts.
c. The Recipient shall notify the State Water Board and the USEPA contact of public or media events publicizing the accomplishment of significant events related to this Project and provide the opportunity for attendance and participation by federal representatives with at least ten (10) working days’ notice.
d. The Recipient shall comply with applicable EPA general terms and conditions found at http://www.epa.gov/ogd.
e. No Recipient may receive funding under this Agreement unless it has provided its DUNS number to the State Water Board.
f. [RESERVED]
g. The Recipient represents and warrants that it and its principals are not excluded or disqualified from participating in this transaction as such terms are defined in Parts 180 and 1532 of Title 2 of the Code of Federal Regulations (2 CFR). If the Recipient is excluded after execution of this Agreement, the Recipient shall notify the Division within ten (10) days and shall inform the Division of the Recipient’s exclusion in any request for amendment of this Agreement. The Recipient shall comply with Subpart C of Part 180 of 2 CFR, as supplemented by Subpart C of Part 1532 of 2 CFR. Such compliance is a condition precedent to the State Water Board’s performance of its obligations under this Agreement. When entering into a covered transaction as defined in Parts 180 and 1532 of 2 CFR, the Recipient shall require the other party to the covered transaction to comply with Subpart C of Part 180 of 2 CFR, as supplemented by Subpart C of Part 1532 of 2 CFR.
h. To the extent applicable, the Recipient shall disclose to the State Water Board any potential conflict of interest consistent with USEPA’s Final Financial Assistance Conflict of Interest Policy at https://www.epa.gov/grants/epas-final-financial-assistance-conflict-interest-policy. A conflict of interest may result in disallowance of costs.
i. USEPA and the State Water Board have the right to reproduce, publish, use and authorize others to reproduce, publish and use copyrighted works or other data developed under this assistance agreement.
j. Where an invention is made with Project Funds, USEPA and the State Water Board retain the right to a worldwide, nonexclusive, nontransferable, irrevocable, paid-up license to practice the invention owned by the Recipient. The Recipient must utilize the Interagency Edison extramural invention reporting system at http://iEdison.gov and shall notify the Division when an invention report, patent report, or utilization report is filed.

City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 21 of 24 ends

Exhibit D
k. The Recipient agrees that any reports, documents, publications or other materials developed for public distribution supported by this Agreement shall contain the Disclosure statement set forth in Exhibit A.
l. The Recipient acknowledges that it is encouraged to follow guidelines established under Section 508 of the Rehabilitation Act, codified at 36 CFR Part 1194, with respect to enabling individuals with disabilities to participate in its programs supported by this Project. m. The Recipient, its employees, contractors and subcontractors and their employees warrants that it will not engage in severe forms of trafficking in persons, procure a commercial sex act during the term of this Agreement, or use forced labor in the performance of this Agreement. The Recipient must include this provision in its contracts and subcontracts under this Agreement. The Recipient must inform the State Water Board immediately of any information regarding a violation of the foregoing. The Recipient understands that failure to comply with this provision may subject the State Water Board to loss of federal funds. The Recipient agrees to compensate the State Water Board for any such funds lost due to its failure to comply with this condition, or the failure of its contractors or subcontractors to comply with this condition. The State Water Board may unilaterally terminate this Agreement if the Recipient that is a private entity is determined to have violated the foregoing.
n. The Recipient certifies to the best of its knowledge and belief that:
i. No federal appropriated funds have been paid or will be paid, by or on behalf of the Recipient, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement. ii. If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress in connection with this Agreement, the Recipient shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions, and notify the State Water Board.
iii. The Recipient shall require this certification from all parties to any contract or agreement that the Recipient enters into and under which the Recipient incurs costs for which it seeks disbursements under this Agreement.
o. The Recipient must comply with the following federal non-discrimination requirements:
i. Title VI of the Civil Rights Act of 1964, which prohibits discrimination based on race, color, and national origin, including limited English proficiency (LEP). ii. Section 504 of the Rehabilitation Act of 1973, which prohibits discrimination against persons with disabilities.
iii. The Age Discrimination Act of 1975, which prohibits age discrimination. iv. Section 13 of the Federal Water Pollution Control Act Amendments of 1972, which prohibits discrimination on the basis of sex.
v. 40 CFR Part 7, as it relates to the foregoing.
vi. Executive Order 13798, including, to the greatest extent practicable and to the extent permitted by law, the requirement to respect and protect the freedom of persons and organizations to engage in political and religious speech vii. All applicable federal civil rights regulations, including statutory and national policy requirements (2 CFR section 200.300).

City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 22 of 24 ends

Exhibit D
p. Executive Order No. 11246. The Recipient shall include in its contracts and subcontracts related to the Project the following provisions:
"During the performance of this contract, the contractor agrees as follows:"(a) The contractor will not discriminate against any employee or applicant for employment because of race, creed, color, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, creed, color, or national origin. Such action shall include, but not be limited to the following:
employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause.
"(b) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, creed, color, or national origin. "(c) The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice, to be provided by the agency contracting officer, advising the labor union or workers' representative of the contractor's commitments under Section 202 of Executive Order No. 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
"(d) The contractor will comply with all provisions of Executive Order No. 11246 of Sept. 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. "(e) The contractor will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders.
"(f) In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of such rules, regulations, or orders, this contract may be cancelled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts in accordance with procedures authorized in Executive Order No. 11246 of Sept 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order No. 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law. "(g) The contractor will include the provisions of Paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order No. 11246 of Sept. 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the contracting agency may direct as a means of enforcing such provisions including sanctions for noncompliance: Provided, however, That in the event the contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the contracting agency, the contractor may request the United States to enter into such litigation to protect the interests of the United States."
City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 23 of 24 ends

Exhibit D
q. The Recipient agrees to comply with the requirements of USEPA’s Program for Utilization of Small, Minority and Women’s Business Enterprises as set forth in this Agreement. r. Procurement Prohibitions under Section 306 of the Clean Air Act and Section 508 of the Clean Water Act, including Executive Order 11738, Administration of the Clean Air Act and the Federal Water Pollution Control Act with Respect to Federal Contracts, Grants, or Loans; 42 USC § 7606; 33 USC § 1368. Except where the purpose of this Agreement is to remedy the cause of the violation, the Recipient may not procure goods, services, or materials from suppliers excluded under the federal System for Award Management: http://www.sam.gov/ . s. Uniform Relocation and Real Property Acquisition Policies Act, Pub. L. 91-646, as amended; 42 USC §§4601-4655. The Recipient must comply with the Act’s implementing regulations at 49 CFR 24.101 through 24.105.
t. The Recipient agrees that if its network or information system is connected to USEPA networks to transfer data using systems other than the Environmental Information Exchange Network or USEPA’s Central Data Exchange, it will ensure that any connections are secure. u. All geospatial data created pursuant to this Agreement that is submitted to the State Water Board for use by USEPA or that is submitted directly to USEPA must be consistent with Federal Geographic Data Committee endorsed standards. Information on these standards may be found at www.fgdc.gov.
v. If the Recipient is a water system that serves 500 or fewer persons, the Recipient represents that it has considered publicly-owned wells as an alternative drinking water supply. w. The Recipient represents that it is not a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and it is not a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months. x. The Recipient agrees to immediately notify the Project Manager in writing about any allegation of research misconduct involving research activities that are supported in whole or in part with EPA funds under this Project, including fabrication, falsification, or plagiarism in proposing, performing, or reviewing research, or in reporting research results, or ordering, advising, or suggesting that subordinates engage in research misconduct.
y. The Recipient agrees to comply with, and require all contractors and subcontractors to comply with, EPA’s Scientific Integrity Policy, available at https://www.epa.gov/osa/policy-epa-scientificintegrity, when conducting, supervising, and communicating science and when using or applying the results of science. For purposes of this condition scientific activities include, but are not limited to, computer modelling, economic analysis, field sampling, laboratory experimentation, demonstrating new technology, statistical analysis, and writing a review article on a scientific issue.
z. The Recipient shall not suppress, alter, or otherwise impede the timely release of scientific findings or conclusions; intimidate or coerce scientists to alter scientific data, findings, or professional opinions or exert non-scientific influence on scientific advisory boards; knowingly misrepresent, exaggerate, or downplay areas of scientific uncertainty; or otherwise violate the EPA’s Scientific Integrity Policy. The Recipient must refrain from acts of research misconduct, including publication or reporting, as described in EPA’s Policy and Procedures for Addressing Research Misconduct, Section 9.C, and must ensure scientific findings are generated and City of Porterville
Project No.: 5410010-018C/ 5400655-001C
Agreement No.: SWRCB0000000000D2002017

Page 24 of 24 ends

Exhibit D
disseminated in a timely and transparent manner, including scientific research performed by contractors and subcontractors.
aa. The Recipient agrees to comply with the Animal Welfare Act of 1966 (7 USC 2131-2156).

Recipient also agrees to abide by the “U.S. Government Principles for the Utilization and Care of Vertebrate Animals used in Testing, Research, and Training,” available at http://grants.nih.gov/grants/olaw/references/phspol.htm#USGovPrinciples. bb. The Recipient certifies that no Project Funds will be used on:
i. Video surveillance or telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities), telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);
ii. Telecommunications or video surveillance services produced by such entities; iii. Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of the National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country; or
iv. Other telecommunications or video surveillance services or equipment in violation of 2 CFR 200.216.

Item No. 20.

CITY COUNCIL AGENDA – JULY 18, 2023
SUBJECT: Consideration of Porterville Navigation Center Expansion SOURCE: Community Development
COMMENT: At its meeting on November 19, 2019, the City Council authorized the acquisition of the former Vine Street School, located at 140 South C S Street, from Porterville Unified School District for the purposes of developing a navigation center to assist individuals experiencing homelessness in Porterville.

The site is comprised of two parcels totaling approximately 1.37 acres. In January 2020, the City entered into a lease agreement for 140 South C Street with Turning Point of Central California for the purposes of operating a navigation center for individuals experiencing homelessness. APN 261-113-011 has three former portable class rooms on permanent foundations, and through the use of a grant, the former lessee converted two of the portable classrooms to housing (15 emergency beds and 15 transitional housing beds) and one classroom to office space. The City made a general fund investment through Resolution No. 17-2019, to provide a $50,000 match that was leveraged by Turning Point to receive grant funds for the development of the navigation center. The City has subsequently allocated Permanent Local Housing Allocation (PLHA), Community Development Block Grant (CDBG), and American Rescue Plan Act (ARPA) funds for the operation of the navigation center. At its meeting on May 23, 2023, the Council directed staff that expansion of the navigation center and support for efforts to reduce homelessness in the community were a significant priority.

The navigation center began operating in September 2020. The navigation center has served a total of 2,577 unduplicated individuals since its opening in September 2020 through the end of June 2023, with twenty-five (25) individuals being placed into permanent housing. Kingsview began operating the navigation center on June 30, 2023, and has served an additional twentyfive (25) unduplicated individuals.

The previous navigation center operator had requested that a restroom and shower facility be developed on site to allow individuals who are receiving assistance from the navigation center, but who are not residing at the center, to have access to restroom and shower facilities. There has also been a request for additional emergency housing, a cafeteria (warming/cooling center), as well as additional office space for case management and use by partnering agencies to provide services.

City staff had conversations with Porterville Unified School District on the acquisition of additional portable classrooms to expand the navigation center Item No. 20.
prior to the storm event in March of 2023, that resulted in the City operating the Army National Guard Armory located at 29 N. Plano Street. The armory is currently operating as an overnight emergency shelter from 8:00pm to 8:00am to provide shelter to those who were displaced from the closure of the Tule River embankments due to the damage from the storm event. The armory currently serves approximately thirty (30) individuals per evening.

The annual Point in Time (PIT) count conducted by the Kings/Tulare Homeless Alliance (KTHA), identified that of the 299 individuals surveyed in Porterville experiencing homelessness, 101 experience chronic homelessness and 227 are unsheltered. The report identifies the number of people who are experiencing sheltered and unsheltered homelessness and provides service agencies, local government and policy-makers the opportunity to evaluate trends in homelessness and to evaluate the success of existing programs.

Staff is seeking the Council’s direction on the expansion of the navigation center to assist unhoused individuals in Porterville. The current navigation center is comprised of thirty (30) beds (fifteen (15) emergency beds and (15) transitional housing beds). The site is 1.37 acres with .68 acres currently undeveloped. Several options that have been preliminarily discussed for a future expansion of the site are included below, but the City is not limited to the options listed. The capacity of the navigation center can be expanded with the addition of portable classrooms that could be converted to emergency housing to create more emergency housing bed capacity, the development of a restroom/shower facility, and the addition of a cafeteria or eating facility that could be utilized for group meetings as well as operate as a cooling and heating center when needed. The navigation center could also be expanded with the development of an emergency shelter on the undeveloped portion of the site that would accommodate the needs of the navigation center and continue to utilize the existing structures. Another option for the site is the development of a permanent supportive housing project on the undeveloped portion of the site that could potentially provide approximately twenty (20) Permanent Supportive Housing (PSH) units while maintaining the same level of emergency shelter and transitional housing beds utilizing the existing structures. The site could also be redeveloped with the removal of the existing structures and redeveloped in a fashion that would best meet the needs of the unhoused individuals in the community. Each of the options presented above includes varying expenses to develop and operate. Based upon the direction received, the staff can research and evaluate the estimated development and operation expenses, and work with partner agencies to evaluate funding and partnership opportunities to facilitate the development.

RECOMMENDATION: That the City Council provide direction on the vision for the facilities of the Porterville Navigation Center.

ATTACHMENTS: 1. Locator Map
Appropriated/Funded:

Item No. 20.

Review By:

Department Director:

Jason Ridenour, Assistant City Manager
Final Approver: John Lollis, City Manager
 






















 
 

$ $ 
$

$


$$
#$ $! #$ "$ 

$


Item No. 21.

CITY COUNCIL AGENDA – JULY 18, 2023
SUBJECT: History of the Establishment of Sewer Districts & Parks Impact Fees SOURCE: Engineering and Project Management
COMMENT: At its meeting on June 20, 2023, the City Council directed staff to present at the next scheduled meeting the history of the fees relating to the sewer districts as well as the Park Impact fee and the potential for other fees to be created.

In 2006, the City annexed properties into the City that were part of County islands (properties or areas of property within County jurisdiction that were surrounded on at least three sides by City jurisdiction). These annexations created a need to extend City services to these newly annexed areas in a way that would help encourage property owners to participate without overextending City resources. Negotiations with lenders included the evaluation of revenues currently collected by the Finance Department, connection fees that would be collected for participating properties, and the usage fees that would be collected for properties that were connected. The findings of the evaluation during these negotiations helped to define the terms that would be offered for these areas if the residents opted to create a sewer utility district via a Prop 218 process that included protest proceedings. The terms agreed upon were that property owners would be assessed the determined fees for their property at a low interest rate of three percent (3%) over the course of thirty (30) years through a property tax assessment.

It is important to note that property owners and developers outside of a sewer district pay for the extension of the sewer line to their property and the connection fees (Exhibit H) for development, as well as all construction work on the property to make the connection. They are also required to find and provide their own funding for these improvements. The fees determined for properties within sewer districts make owners of properties in districts responsible for only two out of the three standard costs for sewer connection; they are responsible for the construction work on the property to make the connection and either their fair share of the construction of the line or the connection fees (Exhibit H) for their property, whichever is lesser. In addition, all properties within a sewer district are automatically offered the ability to pay their determined fees (either fair share of construction or Exhibit H) over thirty (30) years at three percent (3%) interest; this eliminated the need to pay large lump sums upfront or to find and qualify for independent financing for this portion of the costs which, in turn, helped to eliminate or eleviate barriers that would often prevent property owners from connecting.

When the City first started offering the process for creating sewer utility Item No. 21.
districts, it was very common for a property's fair share costs to be significantly less expensive than the adopted connection fees (Exhibit H). With the recent sewer annexation area projects, staff has seen a shift in that trend, where now, the connection fees (Exhibit H) are a savings to the property owners versus the fair share of the construction costs. Initial contact with the property owners shared a not to exceed amount that reflected the fair share of the construction costs as each property in the district must be evaluated for the number of units existing on the property in order to calculate the connection fees (Exhibit H) as adopted. The most recent sewer projects were delayed by the uncharacteristically wet winter preventing finalization of the projects; this delay means that none of the properties have received their final packet detailing the final costs for their property. The final packet will include an explanation of the fair share construction cost for their property, the calculated connection fees (Exhibit H) and an explanation of which of the two fees would actually be assessed on their property should they decide not to opt out of their district. The final package will also include a form that allows them to opt out of the district completely (as long as they have not already connected) to avoid any assessment on their property. Opting out would mean that if they ever decide to connect or are ever required to connect by Code, then they would have to pay the adopted fees at the time of connection and the option for the property assessment over thirty (30) years at three percent (3%) interest is not available.

At this time, properties are only required to connect to City sewer if they are developing their property or if the current septic system for their property fails and they are within two hundred (200) feet of public sewer; this is mandated by the California Plumbing Code.

The final assessment information packets are expected to go out to property owners within the next few months and they will have until June 30, 2024, to complete and submit their form to opt out if they are choosing to do so (and they haven't already connected). Assessments would not start on any of the properties until December of 2024, and all properties within the formed districts are automatically included for assessment unless they opt out.

As mentioned above, both the previous and newly formed sewer districts were created through a Prop 218 process that included protest proceedings. Ballots were sent to all property owners and only the ballots received could be counted as a vote. Also, the terms that were defined for the repayment of the loans included the review with the lending firms of how repayment to the City would be made by the property owners.

The Park Impact Fee is a fee that was created and adopted by way of resolution January 5, 1999, under the Mitigation Fee Act. The Parks and Recreation Element of the City's General Plan identified the impacts of contemplated new development, excluding expansion of existing development, within the General Plan boundaries on existing or planned park facilities, along with which an analysis of the need for both a new park facility and expanded park facilities and improvements required by new development was conducted. This required study established and set forth the relationship between new development, the needed facilities, and the estimated costs of those improvements. The fees Item No. 21.
collected pursuant to this resolution can only finance park facilities described in the City's Park and Recreation Element. As required by the Mitigation Fee Act, changes to or the creation of additional impact fees that fall under the purview of this act must include a study establishing their need and defining their use in a manner compliant with said Act. Currently, the only changes to the Park Impact Fee that are allowed is the annual increase based on the Engineering News-Record (ENR) Cost Index.

On June 6, 2023, City Council authorized the execution of a consultant agreement with QK, Inc for the City's new Parks Master Plan. This plan includes the evaluation of the City's current parks and needed or required improvements, evaluation of new park facilities needed currently and in the future, and a review of the current Parks Impact fee in relation to these needs and in compliance with the Mitigation Fee Act as well as the Quimby Act for parks. This process is lengthy and will include public meetings, interviews with stakeholders, public surveys, and other means of gathering information that will be compiled and presented to Council for review and possible adoption once completed.

The process described above will be required for any potential new fee to be considered for adoption.

RECOMMENDATION: That the City Council consider the report and direction for future utility districts and any additional impact fees that it would like to see the appropriate studies done to evaluate and/or create.

ATTACHMENTS: 1. Exhibit H - Connection Fees

2. Resolution No. 2-99

3. Exhibit A - Park Impact Fees
Appropriated/Funded:

Review By:

Department Director:

Javier Sanchez, Engineering & Project Management Director Final Approver: John Lollis, City Manager
(Reference Acreage Fees) EXHIBIT ‘H’

CONNECTION FEES

EFFECTIVE DATE
SEWER TRUNK LINE FEES 7/01/22 7/01/23*

1. Hillside Development - per acre (∆ 142-02)◊ _ $1,429 $1,472

2. Single Family (RS-1 & RS-2) - per acre (∆ 94-90) $2,680 $2,761

3. Duplex (RM-1) - per acre (∆ 94-90) $6,224 $6,411

4. Multiple Family (RM-2 & RM-3) - per acre (∆ 94-90) $14,520 $14,957

5. Institutional - per acre**(∆ 94-90) $1,009 $1,039

6. Commercial & Professional Office - per acre**(∆ 94-90) $3,784 $3,898

7. Industrial - per acre**(∆ 94-90) $16,154 $16,640

EFFECTIVE DATE
TREATMENT PLANT FEES 7/01/22 7/01/23*

1. Single Family and Multiple Family - per unit (∆ 67-03) $4,392 $4,524

2. Commercial and Industrial - per sewer connection $15.69 $16.16 (∆ 67-03) (per gpd) (per gpd)
($4,392) ($4,524)

EFFECTIVE DATE
SEWER CONNECTION CHARGES 7/01/22 7/01/23*

1. Six Inch or Smaller - per foot $14.48 $14.92

2. Eight Inch - per foot $18.99 $19.56

EFFECTIVE DATE
WATER TRUNK FEES 7/01/22 7/01/23*

1. Hillside Development - per acre (∆ 142-02) ◊ _ $2,103 $2,167

2. Single Family (RS-1 & RS-2) - per acre (∆ 93-90) $4,385 $4,517

3. Duplex (RM-1) - per acre (∆ 93-90) $10,977 $11,308

4. Multiple Family (RM-2 & RM-3) - per acre (∆ 93-90) $25,628 $26,400

5. Institutional**(∆ 93-90) $2,862 $2,948

6. Commercial and Professional Office - per acre**(∆ 93-90) $3,296 $3,395

7. Commercial Crop Cultivation – per acre**(Ord. 1813) D $823 $848

8. Industrial - per acre**(∆ 93-90) $25,312 $26,074

EFFECTIVE DATE
WATER CONNECTION FEE 7/01/22 7/01/23*

1. Connection Charges - per foot $11.77 $12.12

EFFECTIVE DATE
STREET LIGHT FEES 7/01/22 7/01/23*

1. Multiple Family - per foot $3.75 $3.86

2. Commercial/Industrial - per foot $4.74 $4.88

EFFECTIVE DATE
STORM DRAINAGE FEES 7/01/22 7/01/23*

1. Single Family (RS-1 & RS-2) - per acre (inc. Hillside Dev.) (∆ 95- 90) $7,223 $7,441

2. Duplex (RM-1) - per acre (∆ 95-90) $9,635 $9,925

3. Multiple Family (RM-2 & RM-3) - per acre (∆ 95-90) $14,456 $14,891

4. Commercial, Industrial & Institutional - per acre (∆ 95-90) $19,266 $19,846

EFFECTIVE DATE
FIRE HYDRANT FEES 7/01/22 7/01/23*

1. Multiple Family - per foot $4.90 $5.05

2. Commercial/Industrial - per foot $7.27 $7.49
TRANSPORTATION IMPACT FEES◊ _ 7/01/22 7/01/23*

1. Single Family (RS-1 & RS-2) per unit (∆ 50-98) $1,446 $1,489

2. Multiple Family (per unit) (∆ 50-98) $977 $1,006

3. General Office/ Institutional (per 1,000 sq ft of gross floor) (∆ 50-98) $3,977 $4,096

4. Commercial (per 1,000 square feet of gross floor area) (∆ 50-98) $7,564 $7,792

5. Light Industrial (per 1,000 square feet of gross floor area) (∆ 50-98) $1,128 $1,161

EFFECTIVE DATE
FRONTAGE IMPROVEMENT VALUATION THRESHOLD 7/01/22 7/01/23*

1. Frontage Improvements are required when the
Building Permit valuation is over  $27,465 $28,292
(Beginning 2/19/04 - over a two-year period)
*MO #XX-XXXXXX – Based on ENR Index = 13176.3
∆ Resolution Establishing ENR Annual Adjustment
Ordinance No. 1644 dated 2-19-04 (includes Annual Adjustment by ENR) ◊ Fees Covered by the Mitigation Fee Act
**Institutional, Commercial and Industrial water and sewer trunk line fees will be collected based upon the amount stated above, but shall be adjusted after monitoring of actual usage to the following fees:

Water - $220.38 per 100 GPD of actual average demand (adjusted annually by the ENR Construction Cost Index).

Sewer - $187.32 per 100 GPD of actual daily flow (adjusted annually by the ENR Construction Cost Index).

EXHIBIT ‘A’
PARK IMPACT FEES ◊
Effective Date Effective Date
07/01/22 07/01/23*

1. Single Family (RS-1 & RS-2) ∆ $960 $988

2. Multiple Family Per Unit ∆ $745 $767

3. Mobile Homes ∆ $538 $555
To be increased annually by the Engineering News Record Construction Cost Index. *MO #XX-XXXX – Based on ENR Index = 13176.3
∆ Resolution #2-99 (Establishing ENR Annual Adjustment) ◊ Fees Covered by the Mitigation Fee Act
P:\PUBWORKS\GENERAL\ADMINISTRATION\CONNECTION FEES\2023 FEE ADJUSTMENT\EXHIBIT A 2023.DOC Item No. 22.

CITY COUNCIL AGENDA – JULY 18, 2023
SUBJECT: Adoption of Annual Appropriation Limit
SOURCE: Finance
COMMENT: Article XIII-B of the California Constitution requires that each governmental agency must adopt an appropriation limit each fiscal year. This limit represents the maximum amount of tax revenue that can be appropriated during the fiscal year.

The State Department of Finance has provided the percentage change in population of the City of Porterville as well as the percentage change in per capital personal income for the 2023-2024 fiscal year calculation. Based on the information and guidelines established by the State, the appropriation limit for the Fiscal Year 2023-2024 is $93,143,853. With the proceeds of taxes estimated at $41,823,929 for the 2023-2024 Fiscal Year budget, the City continues to appropriate well beneath the maximum limit allowed by law.

RECOMMENDATION: That the City Council approve the draft Resolution adopting the appropriation limit of $93,143,853 for the 2023-2024 Fiscal Year.

ATTACHMENTS: 1. Draft Resolution

2. Appropriations Limit Calculation Worksheet
Appropriated/Funded:

Review By:

Department Director:

Maria Bemis, Finance Director
Final Approver: John Lollis, City Manager
RESOLUTION NO. ___-2023

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF PORTERVILLE SETTING THE APPROPRIATIONS LIMIT FOR THE 2023-2024 FISCAL YEAR
WHEREAS: Article XIII – B of the California Constitution requires that each governmental agency adopt an appropriation limit each fiscal year; and WHEREAS: The State of California has presented the guidelines for the consumer price index, the per capita personal income and the population data for local governments to compute the appropriation limit.

NOW, THEREFORE, BE IT RESOLVED: That the City Council of the City of Porterville does hereby approve the appropriation limit of $93,143,853 for the 2023-2024 fiscal year as computed on the attached worksheet.

PASSED, APPROVED AND ADOPTED this 18th day of July, 2023. ____________________________________
Martha A. Flores, Mayor
ATTEST:

John D. Lollis, City Clerk
By: __________________________________
Patrice Hildreth, Chief Deputy City Clerk

SPECIAL TRAFFIC ZALUD SEWER SOLID GOLF WATER GEN GOV

GENERAL MEAS H MEAS I ARPA GAS TAX LTF SAFETY ESTATE CDBG COPS OPER WASTE AIRPORT COURSE OPER DEBT SERV PROPERTY TAXES 8,960,000 4,300
SALES & USE TAXES 8,385,000 5,380,000 10,760,000
UTILITY USERS TAX 5,600,000
TRANSIENT OCCUPANCY TAX 650,000
BUSINESS LICENSE 800,000
OTHER TAXES 500,000
SPECIAL BENEFIT ASSESSMENTS 240,000
FRANCHISE FEES 1,841,134
PERMITS 705,500

REVENUE FROM STATE
VEHICLE LICENSE FEES IN EXCESS 65,000
HOMEOWNERS RELIEF 21,000
OTHER REV FR STATE 220,000 3,994,338 500,000 200,000 22,000 10,000 OTHER INTERGOVTAL REV 5,000,000 4,100,000 739,000 430,000

USE OF MONEY & PROPERTY
INTEREST 300,000 60,000 200,000 200,000 50,000 100,000 1,000 250 50,000 500 15,000 60,000 50,000 1,500 RENT 121,570 150,000 314,800
FINES & FORFIETURES 23,700 100,000
CHARGES FOR SERVICES 3,601,874 71,000 2,000 6,000 6,988,500 6,887,000 1,025,000 250,000 13,125,000 OTHER REVENUES 147,000 3,000 500 200 104,000 93,000 1,500 500 210,000 31,941,778 5,514,000 10,962,000 5,200,000 4,044,338 4,200,000 101,000 6,750 1,289,200 630,500 7,497,500 7,002,000 1,415,600 250,500 13,385,000 1,500

STORM GEN FUND AIRPORT GOLF EQUIP TOTAL

RISK EQUIP WATER SOLID SEWER TRANSPORT PARK WWTP DRAIN BLDG EQUIP REPL AND COURSE MAINT ESTIMATED

MGMT MAINT LMD REPLACE WASTE RES REVOLV IMPACT DEVEL RESERVE DEVELOP CONSTR REPL DEVEL REPL REPL REVENUES PROPERTY TAXES 8,964,300
SALES & USE TAXES 24,525,000
UTILITY USERS TAX 5,600,000
TRANSIENT OCCUPANCY TAX 650,000
BUSINESS LICENSE 800,000
OTHER TAXES 500,000
SPECIAL BENEFIT ASSESSMENTS 135,000 375,000
FRANCHISE FEES 1,841,134
PERMITS 705,500

REVENUE FROM STATE
MOTOR VEHICLE IN LIEU 65,000
HOMEOWNERS RELIEF 21,000
OTHER REV FR STATE 100,000 150,000 5,196,338
OTHER INTERGOVTAL REV 4,619,179 14,888,179

USE OF MONEY & PROPERTY
INTEREST 300,000 100,000 120,000 30,000 100 120,000 30,000 2,000 150,000 4,000 5,000 18,000 1,967,350 RENT 19,000 605,370
FINES & FORFIETURES 123,700
CHARGES FOR SERVICES 8,546,716 4,265,000 590,584 833,993 303,140 180,000 50,000 797,204 300,000 1,900,000 96,186 60,672 163,740 50,043,609 OTHER REVENUES 500 155,162 45,000 125,000 20,000 905,362 8,547,216 4,284,000 135,000 1,045,746 933,993 468,140 210,000 50,100 1,042,204 330,000 2,000 2,170,000 4,869,365 65,672 181,740 117,776,842 * Source: City of Porterville 2023-2024 proposed Annual Budget.

CITY OF PORTERVILLE

APPROPRIATION LIMIT DOCUMENTATION
FISCAL YEAR 2023-2024

CITY OF PORTERVILLE

APPROPRIATION LIMIT DOCUMENTATION
FISCAL YEAR 2023-2024

PROCEEDS OF TAXES CALCULATION APPROPRIATION LIMIT CALCULATION [1] PROCEEDS TOTAL [2] [3]

PROCEEDS OTHER THAN ESTIMATED CALIFORNIA POPULATION

OF TAXES TAXES REVENUES YEAR PCPI CHANGE CHANGE LIMIT
PROPERTY TAXES $ 8,964,300 $ 8,964,300 1986-1987 BASE YEAR $ 10,422,371 SALES & USE TAXES 24,525,000 24,525,000 1987-1988 3.47% 1.75% 10,972,748 UTILITY USERS TAX 5,600,000 5,600,000 1988-1989 4.66% 2.27% 11,744,767 TRANSIENT OCCUPANCY TAX 650,000 650,000 1989-1990 5.19% 8.28% 13,377,258 BUSINESS LICENSE 800,000 800,000 1990-1991 4.21% 7.03% 14,920,454 OTHER TAXES 500,000 500,000 1991-1992 4.14% 3.79% 16,127,057 SPECIAL BENEFIT ASSESSMENTS $ 375,000 375,000 1992-1993 -0.64% 4.51% 16,746,519 FRANCHISE FEES 1,841,134 1,841,134 1993-1994 2.72% 4.26% 17,934,831 PERMITS 705,500 705,500 1994-1995 0.71% 3.63% 18,717,825 REVENUE FROM STATE 1995-1996 4.72% 2.40% 20,071,738
MOTOR VEHICLE IN LIEU 65,000 65,000 1996-1997 4.67% 2.85% 21,607,847 HOMEOWNERS RELIEF 21,000 21,000 1997-1998 4.67% 2.71% 23,229,852 OTHER REV FR STATE 5,196,338 5,196,338 1998-1999 4.53% 2.05% 24,779,949 OTHER INTERGOVTAL REV 14,888,179 14,888,179 1999-2000 4.91% 1.61% 26,415,190 USE OF MONEY & PROPERTY 2000-2001 7.82% 1.33% 28,859,653 INTEREST 698,629 1,268,721 1,967,350 2001-2002 -1.27% 2.07% 29,082,943 RENT 605,370 605,370 2002-2003 2.31% 2.56% 30,516,481
FINES & FORFIETURES 123,700 123,700 2003-2004 3.28% 2.43% 32,283,295 CHARGES FOR SERVICES 50,043,609 50,043,609 2004-2005 5.26% 2.45% 34,813,941 OTHER REVENUES 905,362 905,362 2005-2006 3.96% 2.18% 36,981,571 2006-2007 4.42% 14.26% 44,122,820
$41,823,929 $ 75,952,913 $ 117,776,842 2007-2008 4.29% 1.99% 46,931,401 2008-2009 0.62% 1.79% 48,067,656
2010-2011 -2.54% 1.98% 47,774,303
2011-2012 2.51% 1.47% 49,693,348
2012-2013 3.77% 1.28% 52,226,842
2013-2014 5.12% 0.92% 55,405,944
2014-2015 -0.23% 0.75% 55,693,099
2015-2016 3.82% 0.75% 58,254,230
2016-2017 5.37% 5.39% 64,690,998
2017-2018 3.69% 1.13% 67,836,078
2018-2019 3.67% 1.14% 71,127,375
2019-2020 3.85% 0.79% 74,449,319
2020-2021 3.73% 0.73% 77,790,030
2021-2022 5.73% 0.49% 82,650,411
2022-2023 7.55% 0.21% 89,077,187
2023-2024 4.44% 0.12% 93,143,853
PROCEEDS OF TAXES $ 41,823,929

PROCEEDS OF TAXES
UNDER APPROPRIATION LIMIT $ 51,319,924
[1] Per City of Porterville 2023-2024 proposed Annual Budget. [2] Per State Department of Finance (per capita personal income). [3] Per State Department of Finance (population growth of City or County, whichever is greater).

Item No. 23.

CITY COUNCIL AGENDA – JULY 18, 2023
SUBJECT: Consideration of Sponsorship of 2023 Tule River Tribe Powwow Scheduled for Friday, September 29th - Sunday, October 1st, 2023
SOURCE: City Manager's Office
COMMENT: The Tule River Tribe has requested that the City consider sponsorship of its upcoming Annual Tule River Tribe Powwow on Friday, September 29 through Sunday, October 1, 2023, at the new Eagle Mountain Casino. Sponsorship levels for the event are defined in levels as Platinum ($5,000+), Gold ($2,500), Silver ($1,000) and Bronze ($500). The City was a Platinum sponsor of last year's Powwow event at $5,000.

The City and the Tribe have a rich history of co-sponsoring each other's important community events, including the Freedom Fest.

RECOMMENDATION: That the City Council consider sponsorship of the 2023 Tule River Tribe Powwow.

ATTACHMENTS: 1. Tule River Tribe Powwow Sponsorship Letter Appropriated/Funded:

Review By:

Department Director:

John Lollis, City Manager
Final Approver: John Lollis, City Manager

Item No. 24.

CITY COUNCIL AGENDA – JULY 18, 2023
SUBJECT: Status and Review of Declaration of Local Flood Emergency SOURCE: City Manager's Office
COMMENT: On March 13, 2023, Mayor Martha A. Flores in conjunction with the Acting City Manager Patrice Hildreth declared the existence of a local emergency within the City of Porterville. Said Declaration was made pursuant to Chapter 9 of the Porterville Municipal Code, and in response to the increasing threat to life and property in the city caused by a series of storm systems striking California and in particular the Porterville area, impacting Success Lake and significantly increasing flows of the Tule River. Pursuant to the California Emergency Services Act (California Government Code 8558 et seq.), emergency declarations must be ratified by the governing body within seven days of being declared. At its Special Meeting on March 17, 2023, the City Council acted to ratify the Declaration of Local Emergency. The Act also requires that the emergency declaration be renewed every sixty (60) days to remain in effect, which at its meeting on June 20, 2023, the Council reviewed and acted to renew the emergency declaration.

On March 10, 2023, due to the volume of water added to Success Lake from significant storm activity, Tulare County Sheriff Mike Bourdreaux issued an Evacuation Warning for both the north and south sides of the Tule River, and the Tulare County Office of Emergency Services (TCOES) established a Temporary Evacuation Point (TEP) and Emergency Shelter in the gymnasium at Porterville College.

On March 15, 2023, due to the water level of Success Lake rising to the point of running over the spillway of the Richard L. Schafer Dam, Sheriff Boudreaux issued a Mandatory Evacuation Order for the residences, businesses and structures between Schafer Dam and Road 284, east of the city of Porterville.

On March 18, 2023, due to water levels dropping on the Tule River, Sheriff Boudreaux reduced the Mandatory Evacuation Order back to an Evacuation Warning.

On March 15, 2023, due to rising flood waters, Sheriff Boudreaux issued a Mandatory Evacuation Order for the area between Olive Avenue (Avenue 152) to Avenue 144 and the Friant-Kern Canal and the Tule River and Westwood Street, west of the city of Porterville. On March 25, 2023, Sheriff Boudreaux reduced the Mandatory Evacuation Order back to an Evacuation Warning.

On March 15, 2023, due to rising water levels of the Tule River, City Public Works Department staff took extraordinary measures to protect the Item No. 24.
neighborhood north of River Springs Drive, avoiding potentially catastrophic flooding of the area.

On March 16, 2023, due to the historic water levels and flows of the Tule River causing erosion to the river banks, Police Chief Jake Castellow issued a Mandatory Evacuation Order for eight residences along Rio Vista Avenue, providing information on the TEP and Emergency Shelter established at Porterville College. City Public Works Department staff took extraordinary measures over the next several days to mitigate and protect the river banks from affecting the residences. On March 24, 2023, Chief Castellow reduced the Mandatory Evacuation Order of the eight residences back to an Evacuation Warning.

On March 19, 2023, due to continued erosion of the banks of the Tule River and the performance of immediate necessary mitigation efforts by Public Works Department personnel, Chief Castellow issued a Mandatory Evacuation Order for both the north and south banks of the Tule River within City limits (not including permanent structures with a designated address), and provided information on the TEP and Emergency Shelter established at Porterville College. The Public Works Department continues to work diligently in shoring the banks of the Tule River.

To accommodate upcoming ceremonies and events in the gymnasium at Porterville College, the TEP and Emergency Shelter at the College closed at noon on April 11, 2023, and thirty (30) individuals were successfully transitioned to the new TEP at the Porterville Army National Guard Armory. A Special Meeting of the Council was scheduled for April 14, 2023, to consider a draft License agreement for the City's temporary use of the State facility. The American Red Cross continued to provide shelter services at the TEP, but transitioned out on May 5, 2023. With the authority granted to the City Attorney and City Manager at its meeting on April 18, 2023, the City and County drafted a Memorandum of Understanding in an effort to continue TEP shelter services until May 5, 2023, while the Mandatory Evacuation Order remained in place along the banks of the Tule River in city limits. On April 14, 2023, the County transmitted a letter to the California Governor's Office of Emergency Services (Cal OES), requesting continued financial support for the Armory TEP, which the County reported that Cal OES did not approve.

Given the lack of continued financial support by Cal OES, the County notified the City that it would discontinue its support of the Armory TEP at noon on May 5, 2023, and American Red Cross would vacate the facility as well, leaving the City alone to determine the function of the Armory TEP after noon on May 5th. The significant threat of local emergency continued to exist with the estimated over three hundred percent (300%) of normal snow pack in the Sierra Nevada mountains and the potential for a warm storm or heat wave this Spring to again inundate the Tule River, described as a "loaded locomotive at the top of the hill." Given the forecasts of potential widespread flooding damage to west Tulare County and significant portions of Kings County later this Spring and early Summer, Red Cross representatives strongly believe they Item No. 24.
will be returning to the Armory TEP and other Tulare County locations (e.g.

Porterville Developmental Center) to assist those displaced from homes due to flooding. Until such time that Cal OES makes the determination that emergency conditions again exist in Tulare County, the Council was left to determine if local emergency conditions existed to continue operating the Armory TEP, which expenditures would not be reimbursable given the lack of approval by Cal OES.

Given the continued mandatory evacuation order along the Tule River in city limits and the legal implications of the Martin v. Boise federal 9th Circuit Court of Appeals decision (2018), and the announced departure of the American Red Cross and County support at noon on May 5, 2023, City staff developed an operational plan for the Armory TEP, cognizant of the lack of federal and State reimbursement of costs. As of April 27, 2023, eighteen (18) individuals were receiving shelter services at the Armory TEP, with most individuals only at the facility in the evening. Given the limited daytime TEP population, and daily meal services provided at the nearby Porterville Welcome Center, staff recommended to limit the Armory TEP hours from 7:00 P.M. to 7:00 A.M. daily, providing temporary staffing of two individuals (including a security guard). Temporary staffing had been quoted at $25 per hour, for a daily expense of $600 (or $18,000 per month). At its meeting on May 2, 2023, the Council authorized the continued operation of the Armory TEP for a 12-hour operational period over the evenings, and also directed that the Armory restrooms and shower facilities be used by the individuals at the TEP, which although not ADA-compliant, are not required for non-reimbursable shelter activities while under a Declaration of Local Emergency. The contract for the on-site mobile shower and portable restroom facilities that are ADA-compliant expired on May 11, 2023, which the rental cost was approximately $18,000 per month. However, the City Attorney recommended maintaining a single ADAportable restroom at the facility. Beginning at noon on May 5, 2023, the City assumed administrative and financial responsibility for the Armory, which has established operational hours of 8:00 P.M. to 8:00 A.M. and averaged twenty (20) individuals each evening (please see attached daily census).

On May 4, 2023, the City received an updated draft License agreement for the use of the Armory, proposing a 1-year lease for exclusive use by the City effective May 5, 2023, through May 4, 2024. The draft agreement proposes no fee for the use of the facility, but that the City assume responsibility for the facility's utilities. On Monday, May 8th, the last remaining Army personnel left the facility, with the City now having complete exclusive use of the facility. At its meeting on May 16, 2023, the Council approved the updated draft License agreement for the 1-year exclusive use of the Armory.

On March 31, 2023, Governor Newsom issued Executive Order N-6-23 to support Tulare Lake Basin flood response, which streamlines State preparation, response and recovery actions and supports local flood response efforts and assist in preparing communities for the impacts of snowmelt runoff in the months ahead.

Item No. 24.

On April 3, 2023, President Biden granted a Major Disaster Declaration for the State of California, triggering the release of Federal funds to help individuals and communities recover from Severe Winter Storms, Straight-line Winds, Flooding, Landslides and Mudslides that occurred February 21, 2023, and continuing. Monterey and Tulare counties were designated in the Major Disaster Declaration for both Individual and Public Assistance, as well as Hazard Mitigation.

On May 17, 2023, Governor Newsom issued Executive Order N-7-23 to support Tulare Lake Basin flood response, which extends flood diversion and groundwater recharge flexibilities implemented for the Tulare Lake Basin, including Kern River floodwater to be allowed into the California Aqueduct.

At its meeting on April 4, 2023, the Council approved Resolution No. 15-2023, which authorized the appropriation of funds from the Catastrophic/Emergency Reserve Fund for the costs associated with the response to the local emergency including personnel, equipment, services and other necessary expenditures. At its meeting on April 18, 2023, the Council approved two emergency expenditures that exceeded $5,000 in their acquisition, which included additional Water Rescue Equipment for the Fire Department ($6,417.70) and the 30-day rental of two mobile shower/restroom units ($13,151) for the Armory TEP due to the facility's restrooms and showers not being compliant with the Americans with Disabilities Act (ADA). At its meeting on May 2, 2023, the Council approved two additional emergency expenditures that exceeded $5,000 in their acquisition, which included a trailer-mounted 6" dewatering and sewage pump ($77,396.67), and local trucking services of riprap material ($5,436.00), both for the Public Works Department.

In support of two private personnel providing nightly security at the Armory as it continues to function as a temporary evacuation point and shelter, City staff has secured TopKnotch Security, Inc. as the security services provider.

TopKnotch provided an agreement for security services for approximately $18,000 per month (2 personnel at $25/hour for 12 hours per day for 30 days per month), which the Council approved at its meeting on June 6, 2023.

RECOMMENDATION: That the City Council receive the report of status and review of the Declaration of Local Emergency and determine the need exists to continue said Declaration.

ATTACHMENTS: 1. Declaration of Local Emergency - March 13, 2023

2. Resolution No. 11-2023

3. Rio Vista Avenue Mandatory Evacuation Order - March 16, 2023

4. Tule River Banks Mandatory Evacuation Order - March 19, 2023

5. Governor Newsom Executive Order N-6-23

6. Governor Newsom Executive Order N-7-23

7. Federal Disaster Declaration Fact Sheet - April 3, 2023

8. License to Use State Military Property - April 14, 2023 Item No. 24.

9. City and County Memorandum of Understanding for
Shelter Support

10. County of Tulare CalOES Shelter Support Request Letter - April 14, 2023

11. License to Use State Military Property - May 16, 2023

12. Armory Temporary Evacuation Point and Shelter - Daily Census

13. Resolution No. 15-2023

14. Rescue Source & Rescue 3 Invoice: Water Rescue
Equipment

15. Royal Restrooms Invoice: Mobile Shower-Restroom Units

16. Rain for Rent Pump Invoice

17. Mike Clark Trucking Invoice

18. TopKnotch Security, Inc. Agreement

19. Municipal Code Chapter 9 - Civil Defense and Disaster

20. California Government Code 8558
Appropriated/Funded:

Review By:

Department Director:

John Lollis, City Manager
Final Approver: John Lollis, City Manager

Police Department
350 North "D" Street
Porterville, CA 93257
(559) 782-7400/FAX (559) 784-1070
www.PortervillePolice.com
Porterville Police Department Mission Statement
Jake Castellow
Chief of Police
The members of the Porterville Police Department are committed to the safety and security of the community while providing quality service with excellence, honesty and integrity.

Police Department
350 North "D" Street
Porterville, CA 93257
(559) 782-7400/FAX (559) 784-1070
www.PortervillePolice.com
Porterville Police Department Mission Statement
Jake Castellow
Chief of Police
The members of the Porterville Police Department are committed to the safety and security of the community while providing quality service with excellence, honesty and integrity.

EXECUTIVE DEPARTMENT

STATE OF CALIFORNIA
EXECUTIVE ORDER N-6-23
WHEREAS on March 1, 2023, March 8, 2023, March 12, 2023, March 14, 2023, and March 28, 2023, I proclaimed a State of Emergency to exist in 47 counties, cumulatively, as a result of a series of ongoing winter storms that initially struck California beginning in late February and continue to significantly impact the counties identified in my Proclamations; and WHEREAS the State has experienced over a dozen atmospheric rivers since December 2022, resulting in compounding and cumulative impacts across California, including what are expected to be record amounts of snow in the Sierra Nevada, in particular in the southern Sierra, and current and forecasted precipitation are expected to add to historic snowpack levels already composed of several million acre-feet of snow water content; and WHEREAS reservoirs into which the Sierra snowpack runoff would flow are already impacted by runoff, which is expected to greatly exceed available storage capacity in the reservoirs in and around the Tulare Lake Basin and the San Joaquin River Basin, and much of the ground in the area has reached saturation due to the series of ongoing winter storms; and WHEREAS the Tulare Lake Basin is the terminal point for the Kings, Kaweah, Tule, and Kern Rivers, and several smaller streams, meaning that water from additional expected rains and Sierra snowpack runoff that cannot be stored in reservoirs or absorbed into the ground will flow into the basin; and WHEREAS recent storms have already caused flooding in the Tulare Lake Basin, leading to emergency rescues and evacuation orders in Allensworth, Alpaugh, and other communities in Tulare and Kings Counties, and leading to dozens of levee breaks and local agencies directing strategic cuts to canals and levees to prevent further flooding of communities; and WHEREAS runoff from the snowpack caused by the winter storms could result in flood conditions in the Tulare Lake Basin resembling those last experienced in the historic floods of 1969 and 1983, following historic snowpacks in those years; and
WHEREAS local flood control districts and other local governments generally have flood control responsibility in the Tulare Lake Basin, but state agencies such as the California Department of Forestry and Fire Protection (CAL FIRE), the California Department of Water Resources, and the Governor’s Office of Emergency Services are actively engaged in supporting this local effort, and state agencies will continue to provide technical advice and other resources and support as needed, with a particular priority on protecting the lives and health of local communities; and
WHEREAS stretches of the San Joaquin River have been or are at flood stage this spring, river stages are expected to stay high throughout the spring as snowpack melts, and multiple levee repairs are underway on the lower San Joaquin River; and
WHEREAS the Tulare Lake Basin is hydrologically connected to the San Joaquin River Basin and that connection has the potential to exacerbate the flood risk in the San Joaquin River Basin, and so further emergency response efforts may become necessary in the San Joaquin River Basin as well; and WHEREAS heavy accumulation of snowfall on the roof of Bear Valley Elementary School, located in Alpine County, currently renders instructional space unsafe for use; and
WHEREAS frequent flooding and flood evacuation orders have resulted in school closures and low student attendance in Pajaro Middle School, Hall District Elementary School and Ohlone Elementary, located in Pajaro Valley Unified School District in Santa Cruz County; and
WHEREAS it is critical that displaced students are back in school facilities as quickly as possible to ensure continuity in education; and WHEREAS the State of California and local governments, in collaboration with the Federal government, continue sustained efforts to respond to and mitigate the effects of these storms; and
WHEREAS on March 9, 2023, I requested a Presidential Emergency Declaration related to these late winter storms, which was expeditiously approved by President Joseph R. Biden, Jr.; and
WHEREAS on March 15, 2023, I requested the addition of 9 counties to the existing Presidential Emergency Declaration related to these late winter storms, which was expeditiously approved by the President; and
WHEREAS on March 28, 2023, I also requested the President issue a Major Disaster Declaration related to these late winter storms for counties that met the validated damage threshold; and
WHEREAS under the provisions of Government Code section 8571, I find that strict compliance with various statutes and regulations specified in this order would prevent, hinder, or delay the mitigation of the effects of these ongoing winter storms.

NOW, THEREFORE, I, GAVIN NEWSOM, Governor of the State of California, in accordance with the authority vested in me by the State Constitution and statutes, and in particular, Government Code sections 8567, 8571, and 8627, do hereby issue the following Order to become effective immediately:

IT IS HEREBY ORDERED THAT:

1. All provisions contained in the above-referenced Proclamations of a State of Emergency shall remain in full force and effect.

2. To protect health, safety, and the environment, and to reduce the risks of local catastrophic flooding in the Tulare Lake Basin, Chapter 6 (commencing with section 1600) of Division 2 of the Fish and Game Code, and regulations adopted pursuant to that Chapter, are suspended for activities that meet all of the requirements in Paragraph

3. 3. The suspension created by Paragraph 2 shall apply to floodwater diversion, debris removal, and levee repair and breech in the Tulare Lake Basin, on the condition that the actions cease when the flood conditions have abated to the point there is no longer flooding outside of defined streambeds and levees. Additionally, the suspension created by Paragraph 2 shall apply to floodwater diversion only if all of the following additional conditions are met:
a. The diversion of floodwater from the Tulare Lake Basin or rivers or streams flooding the Tulare Lake Basin must occur between March 31, 2023, and August 1, 2023, for flood management purposes.
b. For diversions directly from rivers or streams, a local or regional flood control agency, city, or county has given notice via its internet website, electronic distribution list, emergency notification service, or another means of public notice that flows downstream of the point of diversion are at imminent risk of flooding and inundation of land, roads, or structures.
c. For diversion of floodwaters in the Tulare Lake Basin (that is, waters no longer contained within a defined streambed or levee), a local or regional flood control agency, city, or county has given notice via its internet website, electronic distribution list, emergency notification service, or another means of public notice that areas from which the floodwaters are diverted are either at imminent risk of flooding or already flooded, with potential or existing inundation of land, roads, or structures. d. Any water diverted is not diverted to and will not be applied to any area that has not been in active irrigated agricultural cultivation within the past three years, including grazing lands, annual grasslands, and natural habitats. This limitation does not apply to facilities already constructed for the purposes of groundwater recharge or managed wetlands.

4. In addition to the mandatory conditions set forth in Paragraph 3, any person conducting planned levee breaches or controlled inundation to prevent further catastrophic flooding pursuant to the suspension created by Paragraph 2 should take care, wherever feasible, to protect above-ground infrastructure and drinking water and wastewater infrastructure such as drinking water well field sites, wastewater discharge ponds, and other water resources that are necessary for the protection of human health and the recovery of impacted communities.

5. For purposes of conducting emergency flood preparation and response activities, for any (a) actions taken by state agencies, (b) actions taken by a local agency where the Secretary of the Natural Resources Agency concurs that local action is required, and (c) permits necessary to carry out actions under (a) and (b), Public Resources Code, Division 13 (commencing with Section 21000) and regulations adopted pursuant to that Division, are suspended to the extent necessary to address flood impacts in the Tulare Lake Basin.

6. To support adequate state staffing for all state agencies and departments with an assigned response and/or recovery role related to flooding in the Tulare Lake Basin, consistent with applicable federal law, work hour limitations for retired annuitants, permanent and intermittent personnel, and state management and senior supervisors are suspended. Furthermore, reinstatement and work hour limitations in Government Code sections 21220, 21224(a), and 7522.56(b), (d), (f), and (g), and the time limitations in Government Code section 19888.1 and California Code of Regulations, title 2, sections 300-303 are suspended. All other restrictions must be adhered to for retired annuitants. The Director of the California Department of Human Resources must be notified of any individual employed in state government pursuant to these suspensions. The suspension of statutes identified in this Paragraph shall also apply to local governments, as applicable, to ensure adequate staffing to appropriately respond to the flooding in the Tulare Lake Basin. Local governmental agencies shall notify the California Public Employees' Retirement System of any individual employed by an agency pursuant to this Paragraph.

7. The limitation for the period of employment for State Personnel Board emergency appointments, as provided in Government Code section 19888.1, is suspended for positions required for emergency response and/or recovery operations related to flooding in the Tulare Lake Basin.

The requirements and period of employment for such appointments will be determined by the Office of Emergency Services but shall not extend beyond the termination date of the State of Emergency.

8. To the extent the Alpine County Office of Education and Alpine County Unified School District are required to use temporary facilities such as the Alpine County Public Library due to extraordinary snowpack on the roof of Bear Valley Elementary School, rendering instructional space unsafe, the requirements of Education Code sections 17280, et seq., 17365, et seq., and Government Code sections 4453 and 14963 are suspended with respect to those temporary facilities. The requirements of the California Building Code (codified in Title 24 of the California Code of Regulations), as adopted and enforced by the local building and fire agencies with jurisdiction over the area, shall apply to these temporary facilities.

9. To the extent the Alpine County Office of Education and Alpine County Unified School District are required to temporarily use buildings, as defined in the California Building Code (California Code of Regulations, Title 24, Part 2, Chapter 2, section 202), such as the Alpine County Public Library due to extraordinary snowpack on the roof of the Bear Valley Elementary School, rendering instructional space unsafe, local planning and zoning regulations shall be suspended to allow immediate occupancy of such buildings for use as public school facilities. In addition, the requirements of the California Building Code, as adopted and enforced by the local building and fire agencies with jurisdiction over the area, shall apply, except that the requirements relating to Change of Use or Occupancy Classification in the California Building Code (California Code of Regulations, Title 24, Part 2, Chapter 1, section 111) shall not trigger immediate code upgrades, and a Certificate of Occupancy shall not be withheld for such immediate and temporary use of the facilities as a public school, as long as such facilities met building code requirements at the time of their construction, are accessible to individuals with disabilities, and are judged safe for use by the local building official.

10.Education Code section 60641(a) requiring that all pupils be administered academic assessments in mathematics, English language arts, and science, as provided for in Education Code section 60640, is suspended for the 2022-2023 school year for Pajaro Middle School, Hall District Elementary School and Ohlone Elementary School of the Pajaro Valley Unified School District, if a federal waiver is approved by the United States Department of Education.

I FURTHER DIRECT that as soon as hereafter possible, this Order be filed in the Office of the Secretary of State and that widespread publicity and notice be given of this Order.

This Order is not intended to, and does not, create any rights or benefits, substantive or procedural, enforceable at law or in equity, against the State of California, its agencies, departments, entities, officers, employees, or any other person.

IN WITNESS WHEREOF I have
hereunto set my hand and caused
the Great Seal of the State of
California to be affixed this 31st day
of March 2023.
________________________________

GAVIN NEWSOM
Governor of California
ATTEST:
________________________________
SHIRLEY N. WEBER, Ph.D.

Secretary of State

EXECUTIVE DEPARTMENT

STATE OF CALIFORNIA
EXECUTIVE ORDER N-7-23
WHEREAS on March 1, March 8, March 12, March 14, March 28, April 20, and May 15, 2023, I proclaimed a State of Emergency to exist in 52 counties, cumulatively, as a result of a series of winter storms that initially struck California beginning in late February and continue to significantly impact the counties identified in my Proclamations; and
WHEREAS on March 31, 2023, I issued Executive Order N-6-23 to further bolster the emergency response to this Late Winter Storms event, particularly in the Tulare Lake Basin that continues to be plagued by historic flooding; and WHEREAS on April 21, May 10, July 8, and October 19, 2021, I proclaimed States of Emergency to exist due to drought conditions; and WHEREAS on March 10, 2023, I issued Executive Order N-4-23 to address evolving drought conditions due to the winter storms and to mitigate flooding by facilitating groundwater recharge; and
WHEREAS due to the complexity of the impacts from over a dozen Atmospheric River events since December 2022, including the accumulation of a record snowpack in the Sierra Nevada that is likely to yield record snowmelt runoff, especially in the Tulare Lake Basin, I previously issued Executive Orders identified herein to respond to and recover from the winter storms, and those orders now require updating in-light of the most recent runoff conditions and the State’s more robust and recent modeling of likely flood impacts; and WHEREAS the Tulare Lake Basin includes portions of Fresno, Kings, Tulare, and Kern counties and is the terminal point for the Kaweah, Tule, and Kern Rivers as well as a portion of the Kings River and several smaller streams, meaning that water from Sierra snowpack runoff that cannot be stored in reservoirs or absorbed into the ground will flow into the basin; and
WHEREAS the Tulare Lake Basin is hydrologically connected to the San Joaquin River Basin via the James Bypass and Fresno Slough and that connection has the potential to exacerbate the flood risk in the San Joaquin River Basin, and so further emergency response efforts may become necessary in the San Joaquin River Basin; and
WHEREAS stretches of the San Joaquin River, Chowchilla and Eastside Bypasses, San Joaquin River mainstem and tributaries (Fresno River, Chowchilla River, Merced River, Stanislaus River, and Tuolumne River, hereafter, San Joaquin River Tributaries), and Fresno Slough/James Bypass have been or are at flood stage this spring, river stages are expected to stay high or increase throughout the spring and summer as snowpack melts, and multiple levee repairs are underway on the lower San Joaquin River; and
WHEREAS the Kern River – California Aqueduct Intertie exists to move floodwaters safely from the Kern River into the California Aqueduct, and the Kern River Watermaster on May 10, 2023, requested the use of the Intertie to prevent Kern River floodwater from exacerbating flooding in the Tulare Lake Basin, and state agencies have begun actions to safely enable the diversion of these flood flows; and
WHEREAS under the provisions of Government Code section 8571, I find that strict compliance with various statutes and regulations specified in this Order would prevent, hinder, or delay the mitigation of the effects of these ongoing winter storms.

NOW, THEREFORE, I, GAVIN NEWSOM, Governor of the State of California, in accordance with the authority vested in me by the State Constitution and statutes, and in particular, Government Code sections 8567, 8571, and 8627, do hereby issue the following Order to become effective immediately:

IT IS HEREBY ORDERED THAT:

1. All provisions contained in the above-referenced Proclamations of a State of Emergency and Executive Orders shall remain in full force and effect except as modified in this Order.

2. Paragraph 2 of Executive Order N-6-23 is withdrawn and replaced by the following:

To protect health, safety, and the environment, and to reduce the risks of local catastrophic flooding in the Tulare Lake or San Joaquin River Basins, the following are suspended for activities that meet the requirements in Paragraph 3.
a. Chapter 6 (commencing with section 1600) of Division 2 of the Fish and Game Code, and regulations adopted pursuant to that Chapter; and
b. Division 13 (commencing with Section 21000) of the Public Resources Code, and regulations adopted pursuant to that division.

3. Paragraph 3 of Executive Order N-6-23 is withdrawn and replaced by the following, except that any diversion in the Tulare Lake Basin that is operational as of June 1, 2023, may continue to operate under Paragraph 3 of Executive Order N-6-23 until August 31, 2023:

The suspensions created by Paragraph 2 shall apply to floodwater diversion, floating vegetation and debris removal, and levee repair and breach, in the Tulare Lake or San Joaquin River Basins, on the condition that the actions cease when the flood conditions have abated to the point there is no longer a risk of, or existing, flooding causing inundation of land, roads, or structures at or downstream of the point of diversion.

4. Additionally, the suspensions created by Paragraph 2 shall apply to floodwater diversion only if all the following additional conditions are met:
a. Any diversion of floodwaters directly from the (i) Tulare Lake Basin or rivers or streams or bypasses flooding the Tulare Lake Basin or (ii) the San Joaquin River or San Joaquin River tributaries (including Fresno Slough and James Bypass) or San Joaquin River bypasses must occur between March 31, 2023, and August 31, 2023, for flood management purposes.
b. With respect to diversions of floodwaters directly from rivers or streams or bypasses, a local or regional flood control agency, city, or county has given notice via its internet website, electronic distribution list, emergency notification service, or another means of public notice, that flows downstream of the point of diversion are at imminent risk of flooding and inundation of land, roads, or structures.
c. With respect to diversions of floodwaters that are no longer contained within a defined streambed or levee, a local or regional flood control agency, city, or county has given notice via its internet website, electronic distribution list, emergency notification service, or another means of public notice that areas from which the floodwaters are diverted are either at imminent risk of flooding or already flooded, with potential or existing inundation of land, roads, or structures, or are on lands inundated as a result of actions within subparagraph (a). d. Any floodwater diverted is not diverted to and will not be applied to:
i. Any barn, ponds, or lands to which manure or waste from an animal facility that generates waste from the feeding and housing of animals for more than 45 days per year in a confined area that is not vegetated are applied;
ii. Any agricultural field where pesticide or fertilizer application has occurred in the prior 30 days or in the period prohibited by applicable law, whichever is longer; iii. Any area that could cause damage to critical levees, infrastructure, wastewater and drinking water systems,
drinking water wells or drinking water supplies, or
exacerbate the threat of flood and other health and
safety concerns; or
iv. Any area that has not been in active irrigated agricultural cultivation within the past three years including grazing lands, annual grasslands, and natural habitats. This
limitation does not apply to facilities already constructed for the purposes of groundwater recharge or managed
wetlands.
e. With respect to diversions of floodwaters from waters tributary to the Sacramento and San Joaquin River Delta as defined in Water Code section 12220 (Delta), water rights holders are not making releases of stored water or reoperating facilities to provide flow for the purposes of meeting water quality control plan or endangered species requirements in the Delta at the time of the diversion.
f. With respect to diversions of floodwaters directly from the San Joaquin River or San Joaquin River Tributaries, the diversion uses:
i. either existing diversion infrastructure or temporary pumps; ii. no new permanent infrastructure or permanent
construction; and
iii. simple screens installed on temporary pump intakes to minimize the impacts of diversion to salmon and other
aquatic life.

5. Paragraph 4 of Executive Order N-6-23 is withdrawn and replaced by the following:

In addition to the mandatory conditions set forth in Paragraph 3, any person conducting planned levee breaches or controlled inundation to prevent further catastrophic flooding pursuant to the suspensions created by Paragraph 2 should, wherever feasible, protect aboveground infrastructure and water sources that are necessary for the protection of human health and the recovery of impacted communities.

6. Paragraph 5 of Executive Order N-6-23 is withdrawn and replaced by the following:

For purposes of conducting emergency flood preparation and response activities beyond those provided for in Paragraphs 2 and 3, for any (a) actions taken by state agencies, (b) actions taken by a local agency where the Secretary of the Natural Resources Agency concurs that local action is required, and (c) permits necessary to carry out actions under (a) and (b), Public Resources Code, Division 13 (commencing with Section 21000) and regulations adopted pursuant to that Division, are suspended to the extent necessary to address flood impacts in the Tulare Lake or San Joaquin River Basins.

7. Paragraph 6 of Executive Order N-6-23 is withdrawn and replaced by the following:

To support adequate state staffing for all state agencies and departments with an assigned response and/or recovery role related to flooding in the Tulare Lake or San Joaquin River Basins, consistent with applicable federal law, work hour limitations for retired annuitants, permanent and intermittent personnel, and state management and senior supervisors are suspended. Furthermore, reinstatement and work hour limitations in Government Code sections 21220, 21224(a), and 7522.56(b), (d), (f), and (g), and the time limitations in Government Code section 19888.1 and California Code of Regulations, title 2, sections 300-303 are suspended. All other restrictions must be adhered to for retired annuitants. The Director of the California Department of Human Resources must be notified of any individual employed in state government pursuant to these suspensions. The suspension of statutes identified in this Paragraph shall also apply to local governments, as applicable, to ensure adequate staffing to appropriately respond to the flooding in the Tulare Lake Basin. Local governmental agencies shall notify the California Public Employees' Retirement System of any individual employed by an agency pursuant to this Paragraph.

8. Paragraph 6 of Executive Order N-6-23 is withdrawn and replaced by the following:

The limitation for the period of employment for State Personnel Board emergency appointments, as provided in Government Code section 19888.1, is suspended for positions required for emergency response and/or recovery operations related to flooding in the Tulare Lake or San Joaquin River Basins. The requirements and period of employment for such appointments will be determined by the Office of Emergency Services, but shall not extend beyond the termination date of the State of Emergency.

9. Paragraph 3 of Executive Order N-4-23 is withdrawn and replaced by the following, except that any diversion that is operational as of June 1, 2023, may continue to operate under Paragraph 3 of Executive Order N-4-23 until August 31, 2023:

The suspensions created by Paragraph 2 of Executive Order N-4-23 shall apply to diversions of floodwaters as to which all the following conditions are met:
a. Diversions of floodwaters directly from rivers, streams, or bypasses must occur between March 10, 2023, and August 31, 2023, for flood management and associated groundwater recharge.
b. Diversions of floodwaters no longer contained within a defined streambed must prevent imminent risk of flooding or relieve flooding pressure from land, roads, or structures, already inundated, including as a result of actions within subparagraph (a).
c. A local or regional flood control agency, city, or county has given notice via its internet website, electronic distribution list, emergency notification service, or another means of public notice, that waters at or downstream of the point of diversion are at imminent risk of flooding and inundation of land, roads, or structures.
d. The diversions cease when the flood conditions have abated to the point there is no longer a risk of, or existing, flooding causing inundation of land, roads, or structures at or downstream of the point of diversion.
e. Any floodwater diverted is not diverted to and will not be applied to:
i. Any barn, ponds, or lands, to which manure or waste from an animal facility that generates waste from the feeding and housing of animals for more than 45 days per year in a confined area that is not vegetated are applied;
ii. Any agricultural field where pesticides or fertilizer application has occurred in the prior 30 days or in the period prohibited by applicable law, whichever is longer; iii. Any area that could cause damage to critical levees, infrastructure, wastewater and drinking water systems,
drinking water wells or drinking water supplies, or
exacerbate the threat of flood and other health and
safety concerns; or
iv. Any area that has not been in active irrigated agricultural cultivation within the past three years, including grazing lands, annual grasslands, and natural habitats. This
limitation does not apply to facilities already constructed for the purpose of groundwater recharge or managed
wetlands.
f. With respect to diversions of floodwaters from waters tributary to the Sacramento and San Joaquin River Delta (Delta) as defined in Water Code section 12220 (Delta), water rights holders are not making releases of stored water or reoperating facilities to provide flow for the purposes of meeting water quality control plan or endangered species supporting regulatory requirements in the Delta at the time of the diversion.
g. The diversion uses:
i. Either existing diversion infrastructure or temporary pumps; ii. Existing groundwater recharge locations, where available; iii. No new permanent infrastructure or permanent
construction; and
iv. Simple screens installed on temporary pump intakes to minimize the impacts of diversion to salmon and other
aquatic life.
h. The person or entity availing itself of suspensions created by Paragraph 2 of Executive Order N-4-23 files a preliminary report with the Water Board and any applicable Groundwater
Sustainability Agency (GSA) or GSAs for the basin, no later than 14 days after initially commencing diversion of flood flows for groundwater recharge, and a final report with the Water Board and any applicable GSA or GSAs for the basin no later than September 15, 2023. The preliminary and final reports required by this subparagraph shall:
i. Identify the person or entity utilizing the suspensions created by Paragraph 2 of Executive Order N-4-23;
ii. Identify the triggering condition from subparagraph (c) of this paragraph;
iii. Provide the GPS coordinates for the point of diversion, a map identifying the approximate area inundated by the
flood flows, and the corresponding assessor parcel
number(s);
iv. Identify the time when diversions of floodwaters to groundwater recharge commenced, and for final reports,
when diversions ceased; and
v. Provide an estimate, as of the report's date, of the amount of floodwaters diverted utilizing the suspensions created by Paragraph 2 of Executive Order N-4-23.

The Water Board shall post on its internet website all reports received pursuant to this subparagraph.

10. To mitigate the effects of the Late Winter Storms, including by reducing the risks of local catastrophic flooding in the Tulare Lake Basin, Part 2 (commencing with section 1200) of division 2 of the Water Code, exclusive of section 1225, and regulations adopted pursuant to that part, are suspended for diversions of flood flows into the Kern Intertie and ultimately into the California Aqueduct until August 31, 2023, such that applications and permits for water rights shall not be required for such diversions, nor shall such diversions create new water rights or modify existing water rights, to the extent applications or permits would have been required or water rights would have been affected absent this suspension.

11. The Department of Water Resources and State Water Resources Control Board shall (i) communicate to water systems and others any additional information or actions necessary for those systems and others to monitor and be prepared for the addition of Kern River floodwater in the California Aqueduct, and (ii) collaborate on longterm actions that align water rights and flood response, including actions that maximize in-basin groundwater recharge.

I FURTHER DIRECT that as soon as hereafter possible, this Order be filed in the Office of the Secretary of State and that widespread publicity and notice be given of this Order.

This Order is not intended to, and does not, create any rights or benefits, substantive or procedural, enforceable at law or in equity, against the State of California, its agencies, departments, entities, officers, employees, or any other person.

IN WITNESS WHEREOF I have
hereunto set my hand and caused
the Great Seal of the State of
California to be affixed this 17th day
of May 2023.
_________________________

GAVIN NEWSOM
Governor of California
ATTEST:
_____________________________
SHIRLEY WEBER, PH.D
Secretary of State

Matter No. 2023359
Office of Emergency Services
5957 South Mooney Boulevard, Visalia, California 93277
(559) 624-7495 Telephone (559) 737-4692 Facsimile
April 14, 2023
Ms. Nancy Ward
Director, Governor’s Office of Emergency Services
3650 Schriever Avenue
Mather, CA 95655
Dear Director Ward,
Tulare County appreciates the Office of Emergency Services’ tireless work to support the response to and recovery from DR-4699 in our County and the surrounding region.

Specifically, your negotiation of an ongoing incident period and the expeditious approval of individual assistance programs have been particularly valuable to the affected communities as we continue to recover from storm damages, repair distressed and weakened waterways, and prepare for the impending historic snowmelt runoff.

As current snow moisture content in local watersheds is estimated at over 300% of the historical average, total inflows to local reservoirs through April and July are expected to exceed three times the reservoir capacity. Local reservoir and waterway operators continue to aggressively release water at or near full capacity to make space for the anticipated inflows and prevent a return to spillway flows, while balancing needs of downstream operators to conduct emergency repairs. As a result, a number of homes, agricultural properties, and public spaces remain inundated with floodwater, and more homes may be affected because of the new snowmelt conditions. Specifically, we anticipate similar or worse conditions as a result of the snowmelt.

Tulare County is concerned that current sheltering for individuals affected by inundation and/or evacuation orders, including previously displaced individuals who remain under an evacuation order, may be limited in duration, especially during the current intervening period between storm and snowmelt-induced flooding incidents within the disaster.

Tulare County has entered into an agreement with the City of Porterville to maintain the last remaining emergency evacuation shelter site in the County. The California Department of Social Services and Volunteer Emergency Services Team have pledged support to provide staff and services for only two weeks at this shelter. Forty Tulare County residents who have been displaced due to flood activities are staying at this site. Because the support from CDSS and VEST is limited, the County is concerned that it may not be able to continually fund and staff the ongoing shelter projects. Our concern is the ongoing financial and logistical burden to the County and the incorporated cities therein.

As we are sure that you are aware, emergency protective measures, flood control activities, and damage assessments are being conducted because of the flood conditions in Tulare County. These efforts go hand-in-hand with ensuring that County residents are safe, Office of Emergency Services
5957 South Mooney Boulevard, Visalia, California 93277
(559) 624-7495 Telephone (559) 737-4692 Facsimile
fed, and warm. The State’s cooperation in keeping funding and support from the Department of Social Services and VEST beyond the initial two weeks available for emergency sheltering of Tulare County Residents is vital. Your support in ensuring ongoing funding and logistical support for these critical emergency protective measures is greatly appreciated.

Sincerely,
Andrew Lockman
Office of Emergency Services Manager

Porterville Army National Guard Armory
Temporary Evacuation Point and Shelter
Daily Census
Date: Adults: Youth: Dogs:

Friday, May 5, 2023 12 0 1
Saturday, May 6, 2023 10 0 0
Sunday, May 7, 2023 10 0 0
Monday, May 8, 2023 15 0 1
Tuesday, May 9, 2023 12 0 0
Wednesday, May 10, 2023 8 0 0
Thursday, May 11, 2023 9 0 0
Friday, May 12, 2023 9 0 0
Saturday, May 13, 2023 7 0 0
Sunday, May 14, 2023 6 0 0
Monday, May 15, 2023 13 0 0
Tuesday, May 16, 2023 11 3 4
Wednesday, May 17, 2023 11 3 4
Thursday, May 18, 2023 16 3 4
Friday, May 19, 2023 11 0 3
Saturday, May 20, 2023 14 0 5
Sunday, May 21, 2023 12 0 4
Monday, May 22, 2023 14 0 3
Tuesday, May 23, 2023 14 5 3
Wednesday, May 24, 2023 16 3 3
Thursday, May 25, 2023 13 1 6
Friday, May 26, 2023 18 4 3
Saturday, May 27, 2023 16 5 5
Date: Adults: Youth: Dogs:

Sunday, May 28, 2023 16 1 3
Monday, May 29, 2023 18 1 3
Tuesday, May 30, 2023 19 1 6
Wednesday, May 31, 2023 17 1 3
Thursday, June 1, 2023 19 1 7
Friday, June 2, 2023 17 1 7
Saturday, June 3, 2023 16 1 4
Sunday, June 4, 2023 20 1 8
Monday, June 5, 2023 20 1 6
Tuesday, June 6, 2023 22 1 10
Wednesday, June 7, 2023 23 1 9
Thursday, June 8, 2023 22 1 7
Friday, June 9, 2023 22 1 10
Saturday, June 10, 2023 15 1 6
Sunday, June 11, 2023 26 1 9
Monday, June 12, 2023 18 1 7
Tuesday, June 13, 2023 24 1 4
Wednesday, June 14, 2023 21 1 7
Thursday, June 15, 2023 20 1 4
Friday, June 16, 2023 28 1 6
Saturday, June 17, 2023 20 1 7
Sunday, June 18, 2023 24 1 4
Monday, June 19, 2023 21 0 8
Tuesday, June 20, 2023 28 0 6
Wednesday, June 21, 2023 28 0 4
Thursday, June 22, 2023 22 0 4
Friday, June 23, 2023 27 0 4
Date: Adults: Youth: Dogs:

Saturday, June 24, 2023 26 0 4
Sunday, June 25, 2023 24 0 3
Monday, June 26, 2023 23 0 4
Tuesday, June 27, 2023 30 0 5
Wednesday, June 28, 2023 26 0 6
Thursday, June 29, 2023 27 0 5
Friday, June 30, 2023 25 0 5
Saturday, July 1, 2023 27 0 9
Sunday, July 2, 2023 25 3 3
Monday, July 3, 2023 24 3 3
Tuesday, July 4, 2023 20 3 4
Wednesday, July 5, 2023 28 2 6
Thursday, July 6, 2023 28 2 5
Friday, July 7, 2023 27 2 6
Saturday, July 8, 2023 28 2 5
Sunday, July 9, 2023 36 2 3
Monday, July 10, 2023 28 2 3
Tuesday, July 11, 2023 34 2 4
Wednesday, July 12, 2023 35 2 2

Calwen Inc. dba Rescue Source & Rescue 3
P.O. Box 1050
Wilton, CA 95693
Phone: 916-687-6556
Fax: 916-687-6717
Email: [email protected]
Calwen Inc. dba Rescue Source &
Rescue 3 Intl
Invoice
Order # Date
131282 03/20/2023

PORTERVILLE FIRE DEPARTMENT
40 W CLEVELAND
PORTERVILLE, CA 93257
Phone: 559-782-7526
Email: [email protected] Contact: JANIE RODRIGUEZ PO Number: 23-22733
Bill To: Ship To:

PORTERVILLE FIRE DEPARTMENT
40 W CLEVELAND
PORTERVILLE, CA 93257
Customer: PORTERVILLE FIRE DEPARTMENT
Sales Rep Payment Terms FOB Point Carrier Ship Service Date Scheduled MELISSA NET 30 Origin UPS Next Day Air 03/20/2023
Item
# Type Number Description Unit Price
Qty
Ordered Total Price
1 Kit KT2210 PFD TYPE V PACKAGE $250.00 20 ea $ 5,000.00 2 Sale PF4026R NRS 2022 RAPID RESCUER RED $0.00 20 ea $ 0.00 3 Sale KN2556OR NRS PILOT KNIFE ORANGE $0.00 20 ea $ 0.00 4 Sale WH7905 WHISTLE-RESCUE 3 LOGO WITH COIL $0.00 20 ea $ 0.00 5 Sale HL7050HVL/XL RQ3 STORM PRO HELMET HI VIS

LARGE/XLARGE
$32.00 20 ea $ 640.00
6 Shipping Freight Freight Out $256.00 1 ea $ 256.00
7 Sale Tax Expense Tax Expense $521.70 1 ea $ 521.70
Total:

Subtotal:

Sales Tax:
$6,417.70
$0.00
$6,417.70
March 20, 2023 10:55:08 AM PDT Page 1 of 1
Thank you for your order.

If you have any questions please call 800-457-3728
or e-mail [email protected].

Rain For Rent
Bakersfield
4001 State Rd
Bakersfield CA 93308
United States
661-399-1724
24/7 Emergency 800-742-7246
www.rainforrent.com
Your sales person

JESSE PINTOR
REMIT PAYMENTS TO:

RAIN FOR RENT
FILE 52541
LOS ANGELES, CA 90074-2541
INVOICE Rain for Rent
3/30/2023 23-22734
112354

CITY OF PORTERVILLE

PAYMENT
DUE
PO or JOB#
1854595 4/29/2023

PLEASE PAY

ADDRESS

ADDRESS
NAME
CUSTOMER #

CUSTOMER
CONTRACT # 1169502

CITY OF PORTERVILLE

NAME CITY OF PORTERVILLE
SHIPPED TO JOBSITE:
291 N MAIN ST
PORTERVILLE CA 93257
INVOICE# INVOICE DATE
Corporation Yard
555 N Prospect St
Porterville CA 93257
$77,396.67

PHONE PHONE
Notes:

Requested by: Michael Knight
PO Number: 23-22734
QTY UOM DESCRIPTION PRODUCT # STATUS DATE
OUT
BILLED
THRU

DAYS PRICE AMOUNT TAXABLE
BILLED

1.00 EA Pump BA150E D285 Tlr Mt Diesel 0.00 $65,685.06 Y Eng Hatz 4H50TIC
1022734 SALES $65,685.06

1.00 EA Shipping/Handling 0.00 $5,158.57 Y
Freight
M240 SERVICES $5,158.57
TOTAL RENTALS:

TOTAL SALES:

TOTAL SERVICES:

SUBTOTAL:
$65,685.06
$5,158.57
$70,843.63
$0.00
TOTAL OTHER: $0.00
TAX: $6,553.04
FOR PROPER CREDIT, PLEASE INCLUDE INVOICE NUMBER ON YOUR PAYMENT.

PAST DUE AMOUNTS ARE SUBJECT TO A SERVICE CHARGE OF 1.50% CUSTOMER, (RENTEE OR BUYER as context requires), shall be deemed to accept all terms, conditions and provisions hereof upon execution of this agreement; ordering; or delivery of equipment to customer, whichever comes first.

SIGNATURE: _____________________________ DATE: ___________________ TOTAL: $77,396.67
PAYMENT TERMS: NET 30
Printed Date: 3/30/2023 Page 1 of 1

AG
5/5/23
X*
*Payment to be issued upon completion of a City of Porterville Business License Application AG
AG 5/5/23
5/5/23

State of California

GOVERNMENT CODE
Section 8558
8558. Three conditions or degrees of emergency are established by this chapter:
(a) “State of war emergency” means the condition that exists immediately, with or without a proclamation thereof by the Governor, whenever this state or nation is attacked by an enemy of the United States, or upon receipt by the state of a warning from the federal government indicating that an enemy attack is probable or imminent. (b) “State of emergency” means the duly proclaimed existence of conditions of disaster or of extreme peril to the safety of persons and property within the state caused by conditions such as air pollution, fire, flood, storm, epidemic, riot, drought, cyberterrorism, sudden and severe energy shortage, electromagnetic pulse attack, plant or animal infestation or disease, the Governor’s warning of an earthquake or volcanic prediction, or an earthquake, or other conditions, other than conditions resulting from a labor controversy or conditions causing a “state of war emergency,” which, by reason of their magnitude, are or are likely to be beyond the control of the services, personnel, equipment, and facilities of any single county, city and county, or city and require the combined forces of a mutual aid region or regions to combat, or with respect to regulated energy utilities, a sudden and severe energy shortage requires extraordinary measures beyond the authority vested in the Public Utilities Commission.
(c) (1) “Local emergency” means the duly proclaimed existence of conditions of disaster or of extreme peril to the safety of persons and property within the territorial limits of a county, city and county, or city, caused by conditions such as air pollution, fire, flood, storm, epidemic, riot, drought, cyberterrorism, sudden and severe energy shortage, deenergization event, electromagnetic pulse attack, plant or animal infestation or disease, the Governor’s warning of an earthquake or volcanic prediction, or an earthquake, or other conditions, other than conditions resulting from a labor controversy, which are or are likely to be beyond the control of the services, personnel, equipment, and facilities of that political subdivision and require the combined forces of other political subdivisions to combat, or with respect to regulated energy utilities, a sudden and severe energy shortage or deenergization event that requires extraordinary measures beyond the authority vested in the Public Utilities Commission. (2) A local emergency proclaimed as the result of a deenergization event does not trigger the electric utility obligations set forth in Public Utilities Commission Decision 19-07-015 or its successor decisions as related to deenergization events. A local emergency proclaimed as the result of a deenergization event does not alter the electric utilities’ Public Utilities Commission-approved cost-recovery mechanisms for their own costs associated with deenergization events.
(Amended by Stats. 2022, Ch. 537, Sec. 1. (SB 468) Effective January 1, 2023.)

← All documents from this meeting