STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 9 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
Mitigation Measure Bio-2b: Survey and Avoidance
(Initial and Ongoing Vegetation Management
Activities): Red-legged Frogs. Before any construction
or vegetation management activities (initial or
ongoing) begin, the following measures shall be
included in construction/vegetation management
contracts:
i. Vegetation Stockpiles. Because California redlegged frogs could move into areas under debris piles, where they could then be injured or killed
when the debris piles are disposed of, debris
intended for burning, mastication, or other
disturbance, should not be piled on the ground
within 100 feet of any riparian area unless the piles
would be treated on the same day that they are
created. If vegetation piles cannot be treated or
removed daily, they should be dispersed on the
site, to the extent feasible.
ii. Trash Containment during Construction and
vegetation management Activities. Because human
trash associated with construction activities and
vegetation management activities has the
potential to attract predators, all trash shall be
contained in sealed containers and disposed of on
a daily basis.
iii. Mechanical Support for Vegetation Management.
If off-road mechanical support is necessary for
ongoing vegetation management activities,
Mitigation Measure Bio-2a shall be implemented
for the off-road mechanical support activities.
Prior to issuance of
grading or
construction permits
-andPrior to initial or
ongoing vegetation
management
activities
Project Sponsor/
Applicant
Verify survey was performed
Verify requirements
included in construction
contracts and Vegetation
Maintenance Plan (VMP)
Portola Valley
Planning Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 10 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
Mitigation Measure Bio-2c: Avoidance, Operational
Prohibition of Nighttime Access to Trails: Red-Legged
Frogs. Signage shall be installed at trailheads
indicating that nighttime access to trails and all access off trails is prohibited.
Prior to operation of
trails
Project Sponsor/
Applicant
Verify improvements have
been implemented
Portola Valley
Public Works
Department
Mitigation Measure Bio-3: Survey and Avoidance (all
Construction Activities and Vegetation Management
Activities Involving Off-Road Mechanical
Equipment): Western Pond Turtles. Before any
construction or vegetation management activities
involving off-road mechanical equipment begin, a
qualified biologist shall conduct a preconstruction
survey for western pond turtles no more than 24
hours prior to initial ground disturbing activities
within 100 feet of any stream. If a western pond turtle is encountered in the work area, all activities with the potential to result in the harassment, injury, or death of the individual shall be immediately halted, and the
individual shall be captured and relocated to a safe
location outside of the work area by a qualified
biologist, after which work may proceed.
Within 24 hours prior
to ground disturbing
activities and use of
off-road mechanical
equipment within 100
feet of streams
-andDuring ground
disturbing activities or
the use of off-road
mechanical
equipment
Project Sponsor/
Applicant
Verify survey was performed
Verify relocation has
occurred, if required
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 11 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
Mitigation Measure Bio-5a: Survey and Avoidance
(all Construction Activities and Vegetation
Management Activities Involving Off-Road
Mechanical Equipment): Dusky-footed Woodrats.
Before any construction or vegetation management
activities involving off-road mechanical support begin, the following measures shall be completed and/or
included in construction contracts:
i. Pre-activity Survey. No more than 30 days prior to
any initial ground disturbance or vegetation
removal activities, a pre-activity survey for
woodrat nests shall be conducted by a qualified
biologist within areas where ground disturbance or
vegetation removal shall be conducted and within
10 feet of the disturbance and vegetation removal
areas.
ii. Disturbance-Free Buffers. If feasible, a minimum
10-ft buffer shall be maintained between project
construction activities and each nest to avoid
disturbance. In some situations, a smaller buffer
may be allowed if in the opinion of a qualified
biologist, removing the nest would be a greater
impact than that anticipated due to project
activities. Environmentally sensitive area (ESA)
fencing shall be installed to mark the buffer area
around potentially impacted woodrat nests to
keep workers, construction equipment, and
construction materials out of the area where the
nests are located.
iii. Woodrat Relocation Plan. Due to the large number
of nests that could be impacted and infeasibility of
avoiding impact to all nests at the site, a woodrat
Less than 30 days
prior to construction
activities or
vegetation
management
activities involving
off-road mechanical
equipment
Project Sponsor/
Applicant
Verify survey was performed
Verify buffer zones are
included in construction
contracts and Vegetation
Maintenance Plan (VMP), if
required
Verify relocation has
occurred, if required
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 12 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
relocation plan shall be prepared by a qualified
biologist prior to initial ground disturbance or
vegetation removal activities. At a minimum, the
plan shall include woodrat nest relocation
methods, relocation site habitat requirements,
appropriate relocation sequence with respect to
vegetation management activities, spacing of
nests, timing of relocations, and recommended
protective buffers around nests proposed to
remain in place. The plan shall also include a map
of all woodrat nests, and proposed relocation
areas. Relocation of nest materials shall follow the
following guidance:
If it is determined that disturbance of woodrat
nests cannot be avoided, the woodrats shall be
evicted from their nests prior to the removal of the
nests and onset of ground-disturbing activities to
avoid injury or mortality of the woodrats.
Relocation activities shall follow methods outlined
in the Woodrat Relocation Plan. A qualified
biologist shall monitor and direct all activities
associated with the removal of dusky-footed
woodrat nests (structures). Only as necessary and
to the minimum extent possible, project site
vegetation shall be removed to provide access to
the woodrat nest(s). Following the removal of
vegetation required to access woodrat nests, a
fiber-optic camera shall be used to observe inside
the nest to determine its occupancy prior to
beginning the dismantling process. If young are not
observed, the nest shall be fully dismantled and
materials shall be relocated, as described below. If
dependent young are present, the protocol for
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 13 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
active nests below shall be followed to dismantle
the structure over a two-week period.
Except where dependent young are present,
woodrat structures or nests shall slowly and
progressively be dismantled during a single site
visit. Appropriate personal protective equipment
(e.g. respirator, gloves, and Tyvek suit) shall be
used while dismantling and relocating woodrat
nest material to protect against disease carried by
rodents (e.g., hantavirus). Where feasible, nesting
material or food caches shall be moved to a new
location at least 30 feet outside the disturbance
area, preferably next to a large tree or similar
structure in a riparian or oak woodland habitat, in
an area where it can be used by woodrats to
construct new nests. If no suitable structure is
present, a log pile structure may be constructed to
support the nest materials.
If young are uncovered within the nest prior to or
during the dismantling process, dismantling of the
nest shall be suspended for a period of two weeks
to allow young to develop eyesight and become
mobile. Nest materials shall be placed back on top
of the nest to re-cover the exposed young. After
the two-week period, the above removal
procedures shall be resumed. Within 24 hours of
vegetation removal and completion of nest
dismantling, an additional survey shall be
conducted to confirm no new woodrat nests were
constructed.
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 14 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
Mitigation Measure Bio-5b: Avoidance, Implement
Overgrazing Management Strategy for Annual
Vegetation Management: Dusky- footed Woodrat.
To ensure that annual grazing activities do not result
in excessive disturbance of, or habitat loss around,
San Francisco dusky- footed woodrat nests, grazing
shall be performed so that goats will not graze in any
one area too long. If no off-road mechanical support
of annual vegetation management is required,
Mitigation Measure Bio-5a would not also be required
for this activity.
Prior to vegetation
management
activities involving
goat grazing
Project Sponsor/
Applicant
Verify grazing requirements
are included in Vegetation
Maintenance Plan (VMP)
Portola Valley
Planning and
Building
Department
Mitigation Measure Bio-6: Survey and Avoidance (all
Construction Activities and Vegetation Management
Activities Involving Off-Road Mechanical
Equipment): Pallid Bats. Before any structure
removal, construction, or vegetation management
activities involving off-road mechanical support, or
removal or modification of trees begin, the following
measures shall be completed and/or included in
construction contracts:
i. Potential Roost Habitat Removal September
through February, Outside Pallid Bat Maternity
Season. Prior to any tree removal outside the
March 1 – August 31 pallid bat maternity season, a
qualified biologist shall conduct a pallid bat roost
habitat assessment to determine which trees
proposed for removal are suitable for use by
roosting pallid bats. Unsuitable trees may be
removed without any additional bat-related
measures. Trees determined to be suitable roost
trees may be removed outside the maternity
season, during a two-day tree removal process, to
Prior to construction
activities
-andPrior to vegetation
management
activities
-andPrior to tree removal
or modification
Project Sponsor/
Applicant
Verify survey was performed
Verify buffer zones are
included in construction
contracts and Vegetation
Maintenance Plan (VMP), if
required
Verify eviction procedures
are followed, if required
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 15 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
encourage day-roosting bats to leave potential
roost trees ahead of tree removal. This process
involves removing small branches and small limbs
containing no day-roost habitat (e.g., crevices) on
habitat trees on Day 1, using chainsaws only. The
following day (Day 2), the remainder of the tree is
to be removed. The disturbance caused by
chainsaw noise and vibration, combined with the
physical modification of the tree, is expected to
cause day- roosting bat species to abandon the
roost tree after nightly emergence for foraging.
Trimmed habitat trees must be removed the next
day to prevent re-occupation of trimmed trees.
If suitable roost trees are not proposed for removal
but would undergo a specific treatment (e.g.,
thinning, crown raising), disturbance shall be
scheduled to take place outside the maternity
roost season. If treatment activities cannot occur
outside the maternity season, a pre-activity
evening survey shall be conducted by a qualified
biologist to determine if the tree is occupied by a
maternity colony. If no bats are detected, work
may proceed without any additional surveys. If a
maternity colony is present, work shall be
postponed until the end of the maternity season
(August 31).
ii. Pre-activity Survey for Work within Pallid Bat
Maternity Season (March through August). Prior to
any initial ground disturbance or off-road
mechanical vegetation removal activities, or
removal or modification of trees to occur during
Pallid Bat Maternity Season, a pallid bat roost
habitat assessment shall be conducted for all trees
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 16 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
and structures on and within 150 feet of the
location of the activity, during the appropriate
time of year when bats would be detectable
(March 1 – August 31). A qualified bat biologist
shall conduct the survey to look for evidence of bat
use within suitable habitat. If evidence of use is
observed, or if high-quality roost sites are present
in areas where evidence of bat use might not be
detectable (such as a tree cavity), an evening
survey and/or a nocturnal acoustic survey may be
necessary to determine if a bat colony is present
and to identify the specific location of the bat
colony.
iii. Avoidance. If an active pallid bat maternity colony or non-breeding roost is located, construction
work or vegetation activities shall be redesigned to
avoid disturbance of the roost, if feasible.
iv. Eviction and Alternative Roost Habitat. If an active pallid bat maternity colony or non-breeding bat
roost is located and construction work cannot be
redesigned to avoid removal or disturbance of the
occupied roost, the individuals shall be safely
evicted by a qualified bat biologist between August
1 and October 15 or between February 15 and
March 15, with the timing determined by a
qualified bat biologist.
If eviction is necessary, alternative roost habitat shall be provided at least 30 days prior to eviction of bats
from the roost. A qualified bat biologist shall
determine the appropriate location for the alternative
roost structure, based on the location of the original
roost and habitat conditions in the vicinity, and
oversee installation of a new roost structure. The
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 17 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
structure shall be placed as close to the affected roost site as feasible, taking into account potential for
disturbance during construction on the site (e.g., the
roost might be placed elsewhere on the larger project
site). The roost structure either shall be built to
specifications determined by a qualified bat biologist
or, with approval of a qualified bat biologist as to
structure type, shall be purchased from an
appropriate vendor. Stanford University shall monitor
the roost for up to three years (or until occupancy is
determined, whichever occurs first) to determine use
by bats. If, by Year 3, pallid bats are not using the
structure, a qualified bat biologist, in consultation
with CDFW, shall identify alternative roost designs or
locations for placement of the roost, place the new
roost at the agreed-upon location, and monitor the
new roost for an additional three years (or until
occupancy has been verified).
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 18 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
Mitigation Measure Bio-8a: Avoidance (all
construction and all Vegetation Management
Activities): BMPs for Work within/near Sensitive
Habitats. The following measures shall be
implemented to reduce impacts on mixed riparian
forest and streams during construction on the
Residential Development Area, during the grading of
the fire access road and hiking/equestrian trails, and
during all vegetation management activities:
i. If the CDFW and/or RWQCB determine potentially
impacted areas are under their jurisdiction, the
applicant shall acquire permits from CDFW and
RWQCB and comply with all permit conditions.
ii. Personnel shall prevent the accidental release of
chemicals, fuels, lubricants, and non-storm
drainage water into channels.
iii. Spill prevention kits shall always be in close
proximity when using hazardous materials.
iv. No equipment servicing shall be done in the
stream channel or immediate floodplain, unless
equipment stationed in these locations cannot be
readily relocated (i.e., pumps, generators).
v. Existing native vegetation shall be retained by
removing only as much vegetation as necessary to
accommodate the fire access road and trail
clearing width.
vi. If riparian vegetation is to be removed with
chainsaws, consider using saws currently available
that operate with vegetable-based bar oil.
Prior to issuance of
building or grading
permits
-andPrior to vegetation
management
activities
Project Sponsor/
Applicant
Verify determination of
CDFW and RWQCB.
Verify requirements are
included in construction
contracts and met during
construction
Verify requirements are
included in Vegetation
Maintenance Plan (VMP)
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 19 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
vii. If goat grazing is to be used as a long-term
vegetation management tool in the future,
temporary fencing shall be erected when goats
are introduced to keep them out of riparian
habitats.
viii. Control exposed soil by stabilizing slopes (e.g., with erosion control blankets) and protecting
channels (e.g., using silt fences or straw wattles).
ix. Control sediment runoff using sandbag barriers or
straw wattles.
x. Stabilize site ingress/egress locations.
xi. Temporary disturbance or removal of aquatic and
riparian vegetation shall not exceed the minimum
necessary to complete the work.
xii. Vehicles operated within and adjacent to streams
shall be checked and maintained daily to prevent
leaks of materials that, if introduced to the water,
could be deleterious to aquatic life.
xiii. Potential contaminating materials must be stored
in covered storage areas or secondary
containment that is impervious to leaks and spills.
xiv. All disturbed soils shall be revegetated with native plants suitable for the altered soil conditions upon
completion of construction. Local watershed
native plants shall be used if available. All
disturbed areas that have been compacted shall
be de-compacted prior to planting or seeding.
Cut-and-fill slopes shall be planted with local
native or non-invasive plants suitable for the
altered soil conditions.
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 20 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
Mitigation Measure Bio-8b: Compensatory
Mitigation if Avoidance is Infeasible (All Vegetation
Management Activities): Riparian Habitat. The
riparian habitat within the project site consists of a
mature overstory composed of California bay,
California buckeye, and coast live oak. Riparian
vegetation may be removed during vegetation
treatment activities. All trees removed within mixed
riparian forest habitat shall be replaced with the same species that was removed during project
implementation, which shall be planted within the
same reach where impacts occur or along streams on
other Stanford University lands. Trees shall be
replaced at a ratio of at least 1:1.
Additionally, if trees are to be removed within mixed
riparian forest habitat, a qualified biologist shall
develop a Riparian Mitigation and Monitoring Plan,
which shall contain the following components (or as
otherwise modified by regulatory agency permitting
conditions):
i. Summary of habitat impacts and proposed
mitigation ratios
ii. Goal of the restoration to achieve no net loss of
habitat functions and values
iii. Location of mitigation site(s) and description of
existing site conditions
iv. Mitigation design:
a) Soil amendments and other site preparation
elements as appropriate
b) Planting plan
c) Irrigation and maintenance plan
Prior to vegetation
management
activities
Project Sponsor/
Applicant
Verify requirements are
included in Vegetation
Maintenance Plan (VMP)
Verify compensatory
mitigation completed, if
required
Verify completion of
Riparian Mitigation and
Monitoring Plan, if required
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 21 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
d) Remedial measures/adaptive management,
etc.
v. Monitoring and Success Criteria: the mitigation site shall be monitored by an ecologist during a 5- year
monitoring period. The interim site performance
success criterion is annual replacement of any dead
trees and shrubs during Years 1-3. The final success
criterion at Year 5 shall be defined as 60% average
cover of native trees and shrubs combined.
vi. Reporting requirements
Mitigation Measure Bio-9: Implement Invasive Weed
BMPs. The invasion and/or spread of noxious weeds
shall be avoided by the use of the following invasive
weed BMPs:
i. During construction activities in the Residential
Development Area, all seeds and straw materials
used on-site shall be weed-free rice straw (or
similar material acceptable to the Town), and all
gravel and fill material shall be certified weed-free
to the satisfaction of the Town.
ii. Prior to equipment coming onto the site for
construction or vegetation management activities,
all equipment (e.g., masticators, haul vehicles,
excavators, and other heavy equipment) shall be
washed (including wheels, undercarriages, and
bumpers). Vehicles shall be cleaned at existing
construction yards or legally operating car washes.
iii. Following construction of the residential
development and the fire access road and
hiking/equestrian trails, a standard erosion control
Prior to issuance of
building or grading
permits
-andPrior to vegetation
management
activities
Project Sponsor/
Applicant
Verify requirements are
included in construction
contracts and VMP
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 22 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
seed mix (acceptable to the Town) from a local
source shall be planted within the temporary
impact zones on any disturbed ground that shall
not be under hardscape, landscaped, or
maintained. This will minimize the potential for the
germination of the majority of seeds from nonnative, invasive plant species.
If areas are left bare by vegetation treatments as
carried out by the Vegetation Maintenance Plan
(VMP), a standard erosion control seed mix
(acceptable to the Town) from a local source and
consisting of native species shall be planted on any
disturbed ground.
Mitigation Measure Bio-13a: Nesting Bird Avoidance,
Substrate Pre-removal, Pre-activity Surveys, and
Buffers. The applicant shall conduct or include in work contracts the following measures related to nesting
birds for construction and vegetation management
activities:
i. To the extent feasible, construction and vegetation
management activities should be scheduled to
avoid all potential bird nesting seasons (January 15
to September 15). If these activities are scheduled
to take place outside the nesting season, all
impacts on nesting birds protected under the
MBTA and California Fish and Game Code shall be
avoided.
ii. If construction of the residential development, fire access road, or trails would not be initiated until
after the start of the nesting season, all potential
nesting substrates (e.g., bushes, trees, grasses, and
Within 7 days of
construction or
vegetation
management
activities
Project Sponsor/
Applicant
Verify survey was performed
Verify buffer zones are
included in construction
contracts and Vegetation
Maintenance Plan (VMP), if
required
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 23 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
other vegetation) that are scheduled to be
removed by these project features may be
removed prior to the start of the nesting season
(e.g., prior to January 15). This would preclude the
initiation of nests in this vegetation and prevent
the potential delay of the project construction due
to the presence of active nests in these substrates.
iii. If it is not possible to schedule construction or
vegetation management activities between
September 16 and January 14, then pre-activity
surveys for nesting birds should be conducted by a
qualified ornithologist to ensure that no nests shall
be disturbed during project implementation. These
surveys shall be conducted no more than seven (7)
days prior to the initiation of all project activities.
During this survey, the ornithologist shall inspect
all trees and other potential nesting habitats (e.g.,
shrubs, ruderal grasslands, trees, horse paddocks)
in and immediately adjacent to the impact areas
for nests.
iv. If an active nest is found sufficiently close to work areas to be disturbed by these activities, the
ornithologist shall determine the extent of a
construction- or disturbance-free buffer zone to be
established around the nest (typically 300 feet for
raptors and 100 feet for other species), to ensure
that no nests of species protected by the MBTA
and California Fish and Game Code shall be
disturbed during Project implementation. On a
case by case basis, the ornithologist may
determine that another buffer distance is
appropriate based on the species, the height and
concealment of the nest, vegetation or topography
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 24 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
intervening between the nest and project
activities, and the degree of human activity to
which the nesting birds are already exposed.
Mitigation Measure Bio-13b: Maintain Nesting
Substrate during Vegetation Management. To the
extent feasible, maintain a variety of tree, shrub, and herbaceous nesting substrates during vegetation
management activities. This would involve
maintaining (1) plant species diversity, and structural and age class diversity to accommodate a variety of
tree-nesting species, (2) islands or scattered locations of live and dead or dying trees that support nest
cavity habitat, and (3) islands or scattered locations
supporting moderately dense pockets of shrubs, and
other low-lying vegetation for shrub and groundnesting species.
Prior to vegetation
management
activities
Project Sponsor/
Applicant
Verify requirements are
included in Vegetation
Maintenance Plan (VMP)
Portola Valley
Planning and
Building
Department
Cultural Resources
Mitigation Measure Cultural-1: Residential
Development Area Archaeological Monitoring. Prior
to the issuance of a grading permit in the
development Residential Development Area and
adjacent Alpine Road , the project sponsors shall
obtain the services of a qualified archaeological
consultant (meeting the Secretary of the Interior’s
Professional Qualifications Standards for prehistoric
archaeology (NPS 1983)) to observe all project-related
ground disturbing activities.
In accordance with CEQA Guideline §15064.5 (f),
should any previously unknown prehistoric resources
Prior to issuance of
grading permits for
the Residential
Development Area
and adjacent roadway
-andDuring construction
of that area
Project Sponsor/
Applicant
Verify requirements are
included in construction
contracts and are met
during construction
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 25 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
(including but not limited to charcoal, obsidian or
chert flakes, grinding bowls, shell fragments, bone, or pockets of dark, friable soils) and/or historic-period
resources (including but not limited to glass, metal,
ceramics, wood, privies, trash deposits or similar
debris) be discovered in the Residential Development
Area during grading, trenching, or other on-site
excavation(s), earthwork within 25 feet of these
materials shall be stopped until a qualified
professional archaeologist has an opportunity to
evaluate the potential significance of the find and
suggest appropriate mitigation(s), as determined
necessary to protect the resource.
If feasible, the location of earthwork shall be modified to protect the resource from damaging effects
through avoidance.
If avoidance is not feasible, a qualified archaeologist shall conduct data recovery in the area of potential
adverse effect in accordance with an approved
Archaeological Data Recovery Plan (ADRP)
Once the site has been properly tested, subject to
data recovery, or preserved to the satisfaction of the
professional archaeologist in compliance with CEQA
Guideline §15064.5, the site can be further
developed.
Archaeological monitoring may be reduced or halted
at the discretion of the monitor, and in consultation
with the Town, as warranted by conditions such as
encountering bedrock, ground disturbance is
occurring in fill, or negative findings during the first 60 percent of rough grading. If monitoring is reduced to
spot-checking, spot checking shall occur when
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 26 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
ground-disturbance moves to a new location within
the site and when ground disturbance will extend to
depths not previously reached (unless those depths
are within bedrock).
Mitigation Measure Cultural-2: Vegetation
Management Plan Archaeological Monitoring. Prior
to the implementation of the Vegetation Maintenance
Plan (VMP), the Project sponsor shall hire a qualified
archaeologist (meeting the Secretary of the Interior’s
Professional Qualifications Standards for prehistoric
archaeology (NPS 1983)) to review all proposed
activities and determine if those activities are in or
near (within 50 feet of) P-41-000297 and the
precontact component of the Wedge Quarry/Bedrock
Mortars site. If work is proposed at or within 50 feet
of either of these sites, a qualified archaeologist will be required to accompany the VMP crew and prevent
any work from occurring within 25 feet of the site.
Prior to vegetation
management
activities
Project Sponsor/
Applicant
Verify requirements are
included in vegetation
management contracts
Portola Valley
Planning and
Building
Department
Mitigation Measure Cultural-3a: Halt Construction
Activity, Evaluate Find and Implement Mitigation. In
the event that any previously unidentified cultural
resources (historic / archaeological / paleontological / Native American) are uncovered during site
preparation, excavation or other construction activity, all such activity shall cease until these resources have been evaluated by a qualified consultant and specific
measures can be implemented to protect these
resources in accordance with sections 21083.2 and
21084.1 of the California Public Resources Code.
Prior to issuance of
building or grading
permits
-andDuring construction if
triggered
Project Sponsor/
Applicant
Verify requirements are
included in construction
contracts
Track outcome if triggered
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 27 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
Mitigation Measure Cultural-3b: Halt Construction
Activity, Evaluate Remains and Take Appropriate
Action in Coordination with Native American
Heritage Commission. In the event that any human
remains are uncovered during site preparation,
excavation or other construction activity, all such
activity shall cease until these resources have been
evaluated by the County Coroner, and appropriate
action taken in coordination with the Native American
Heritage Commission, in accordance with section
7050.5 of the California Health and Safety Code or, if
the remains are Native American, section 5097.98 of
the California Public Resources Code.
Prior to issuance of
building or grading
permits
-andDuring construction if
triggered
Project Sponsor/
Applicant
Verify requirements are
included in construction
contracts
Track outcome if triggered
Portola Valley
Planning and
Building
Department
Geology and Soils
Mitigation Measure Geo-2a: Preparation and
Compliance with a Design-Level Geotechnical
Investigation Report prepared by a Registered Civil
or Geotechnical Engineer and with Structural Design
Plans as Prepared by a Registered Structural
Engineer. The Preliminary Geotechnical Investigation
and Geologic Hazards Assessment for the site
identified seismic design criteria for the Project
development. The structural engineering design shall
incorporate seismic design standards required by the
California Building Code/California Residential Code.
In general, the design-level report shall either
corroborate or provide alternative recommendations
to the preliminary report based upon actual soil and
rock conditions in the areas where structures are
proposed. The fire access road shall also be
investigated. As is standard required practice prior to Prior to issuance of
building or grading
permits
Project Sponsor/
Applicant
Verify completion of report
and adherence of structural
design plans to the report
Verify inclusion of
requirements in design plan
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 28 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
issuance of building permits, a design level
geotechnical investigation shall be completed that
includes the following elements:
A) Additional subsurface investigation in areas to be
occupied by structures which shall confirm or
expand on the geotechnical recommendations
presented in the preliminary report related to
seismic ground shaking.
B) Specific measures to addressing the potential for
seismically-induced landslides, such as retaining
structures, buttress fills or other techniques to
reduce the potential for seismically induced
landslides.
C) Additional test pits within the Residential
Development Area and fire access road area to
identify areas of expansive claystone bedrock. As
applicable, measures to address expansive
claystone bedrock shall include control of
drainage measures, depth of excavations, location
of improvements relative to the claystone, the use
of deep foundations, and the use of stiffened
structural slabs and void forms beneath the slabs.
D) Measures for control of expansive clay soils, which
could include the following:
1. Placing and compacting potentially expansive
subgrade soils at high moisture contents (at
least 3 percent above optimum moisture
content in accordance with ASTM D1557) and
compaction within selected ranges of 87 to 92
percent in the upper 5 feet and 95 percent
below a depth of 5 feet.
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 29 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
2. Using thickened concrete slabs with increased
steel reinforcement.
3. Replacing clayey soils underlying foundations
and concrete slabs with select structural fill
that is non-expansive or has a low expansion
index.
4. Treating site soils with lime to reduce the
expansion potential and increase the strength.
5. Utilize pier-and-grade-beam foundation
systems where appropriate;
6. Grade around structures to assure positive
drainage away from structures.
Mitigation Measure Geo-2b: Compliance with
California Building Code (CBC) and California
Residential Code (CRC). Project development shall
meet requirements of the current applicable
California Building Code and California Residential
Code Edition as determined by the Town of Portola
Valley, published by the International Conference of
Building Officials, and as modified by the
amendments, additions and deletions as adopted by
the Town of Portola Valley, California.
Prior to issuance of
building or grading
permits
Project Sponsor/
Applicant
Verify inclusion of
requirements in design plan
Portola Valley
Planning and
Building
Department
Mitigation Measure Geo-5a: Erosion Control Plan.
The Project applicant shall complete an Erosion
Control Plan to be submitted to the Town in
conjunction with the Grading Permit Application. The
Erosion Control Plan shall include winterization, dust, erosion and pollution control measures conforming to
the California Stormwater Quality Association
(CASQA) Stormwater Best Management Plan
Handbook for New Development and Redevelopment.
Prior to issuance of
grading permits
Project Sponsor/
Applicant
Verify submission of ECP and
inclusion of BMPs in
construction contracts
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 30 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
The Erosion Control Plan shall describe the "best
management practices" (BMPs) to be used during and
after construction to control pollution resulting from
both stormwater and construction water runoff. The
Erosion Control Plan shall include locations of vehicle and equipment staging, portable restrooms,
mobilization areas, and planned access routes. The
erosion control plan will also address the fire access
road area.
Recommended soil stabilization techniques include
placement of straw wattles, silt fences, berms, and
gravel construction entrance areas or other control to
prevent tracking sediment onto city streets and into
storm drains.
Mitigation Measure Geo-5b: Storm Water Pollution
Prevention Plan (SWPPP). In accordance with the
Clean Water Act and the requirements of the State
Water Resources Control Board (SWRCB), the
Applicant shall file a SWPPP prior to the start of
construction. The SWPPP shall be prepared by a
Qualified Plan Developer (QSD) and shall include
specific best management practices to reduce soil
erosion and protect ground water quality. This is
required to obtain coverage under the General Permit
for Discharges of Storm Water Associated with
Construction Activities.
During construction, the SWPPP measures shall be
reviewed by a Qualified Individual (QSP) certified to
monitor that the stormwater protection measures are
adequately implemented. Reporting will be
Prior to issuance of
grading permits
-andDuring construction
Project Sponsor/
Applicant
Verify filing of SWPPP
Verify review and
monitoring activities during
construction
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 31 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
performed in accordance with General Permit
requirements.
Hydrology and Water Quality
Mitigation Measure Hydro-1a: Erosion and Sediment
Control Plan. Prior to issuance of grading permits or
approval of improvement plans, the Applicant shall
submit a detailed Erosion and Sediment Control Plan
(ESCP) to the County of San Mateo Planning and
Building Department and the Director of Public Works
of Portola Valley for review and approval. The
purpose of the ESCP shall be to mitigate erosion and
sedimentation impacts during the construction period
for the proposed residential development, trails, and
the new fire access road. The detailed ESCP shall meet
the requirements of both San Mateo County and the
Town of Portola Valley. It shall be accompanied by a
written narrative and shall include, at a minimum, the
following:
a. Proposed schedule of grading activities,
monitoring, and infrastructure milestones in
chronological format. An anticipated construction
schedule and/or construction duration (in weeks
or months) shall be provided.
b. Separate plan sheets for measures to be
implemented at the grading stage and the
construction stage.
c. Delineation of work areas including protection of
surface waters, storm drain inlets, sensitive areas,
and buffer zones.
Prior to issuance of
building or grading
permits
-andDuring construction
Project Sponsor/
Applicant
Verify ESCP completion
Verify requirements are
included in construction
contracts and are met
during construction
Portola Valley
Public Works
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 32 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
d. A separate Tree Protection Plan.
e. All proposed retaining walls, including areas that
will be used for stockpiling and storing
construction materials.
f. Indicate location and method of stabilizing
disturbed bare earth areas. Use seeding and/or
mulching and the following, as necessary: (i) For
slopes less than 3:1, provide silt fencing or fiber
rolls along contour lines; (ii) For slopes greater
than 3:1, anchored erosion blankets (rice, straw,
or coconut) and fiber rolls or silt fencing at the
crest are required. Jute netting is preferred when
used with seeding.
g. Use diversion berms to divert water from unstable
or denuded areas (e.g., top and base of a
disturbed slope, grade breaks where slopes
transition to a steeper slope).
h. Direct water from construction areas to
designated temporary filtration/detention areas.
Show any temporary detention areas for
stormwater and stabilization of those areas.
i. Show location of office trailer(s), storage sheds,
temporary power pole, scaffold footprint, and
other temporary installations on the ESCP. Show
how they will be accessed and show protection of
the access routes.
j. Show location of utility trenches, indicate utility
types, and identify timing of installation.
k. Use stabilized designated access points for
entrance onto the property using 4- to 6-inch
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 33 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
fractured aggregate over geo-textile fabric over
the first 20 feet of the property. If using an
existing paved driveway, identify on ESCP. Where
vehicles or equipment will travel from an existing
paved driveway to unpaved areas within the
property, a stabilized transition point is required
that meets the above standards.
l. Provide designated area(s) for parking of
construction vehicles, using aggregate over geotextile fabrics required that meets the above standards.
m. Show all access roads/ramps and access points
used by excavation equipment, trucks, or
forklifts/crane access. The type of materials used
for stabilization and their locations shall be
indicated on the ESCP. Materials for this purpose
are required to be stored on-site.
n. Show location, installation, and maintenance of a
concrete/stucco mixer, washout, and pits. No
concrete, mortar, or stucco washout is allowed to
be placed directly on the soil/ground. Specify the
method used to contain the washout.
o. Show location of portable toilets away from
surface water locations and storm drain inlets.
p. Show storage location and containment of
construction materials during work, as well as
afterhours/ weekends. Show the location of
lumber, gravel, and materials storage areas on the
ESCP. Show how they will be accessed and show
protection of the access routes.
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 34 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
q. Show areas and proposed protection of temporary
stockpiles using anchored-down plastic sheeting in
dry weather. (Dry weather is defined as a time
interval during which less than 0.1 inch of rain is
observed across a minimum of 72 hours.) The use
of plastic sheeting during the wet season, October
1 through April 30, is not allowed, unless the
stockpile is also protected with fiber rolls
containing the base of the stockpile. Alternatively,
in wet weather, or for longer storage, use seeding
and mulching, soil blankets or mats.
r. Indicate the location of refuse piles and debris box locations on the ESCP. Show how they will be
accessed and show protection of the access
routes.
s. Identify an Erosion Control Point of Contact,
including name, title/qualification, email, and
phone number. The Erosion Control Point of
Contact will be the County’s main point of contact
if Erosion and Sediment Control or Tree Protection
corrections are required.
The ESCP shall also contain the following standard
elements:
t. Perform clearing and earth-moving activities only
during dry weather. Measures to ensure adequate
erosion and sediment control shall be installed
prior to earth-moving activities and construction.
u. Measures to ensure adequate erosion and
sediment control are required year-round.
Stabilize all denuded areas and maintain erosion
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 35 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
control measures continuously between October 1
and April 30.
v. Use sediment controls or filtration to remove
sediment when dewatering site and obtain
Regional Water Quality Control Board (RWQCB)
permit(s) as necessary.
w. Avoid cleaning, fueling, or maintaining vehicles
on-site, except in a designated area where wash
water is contained and treated.
x. Limit and time applications of pesticides and
fertilizers to prevent polluted runoff.
y. Limit construction access routes to stabilized,
designated access points.
z. Avoid tracking dirt or other materials off-site;
clean off-site paved areas and sidewalks using dry
sweeping methods.
aa. Train and provide instruction to all employees and
subcontractors regarding the Watershed
Protection Maintenance Standards and
Construction BMPs.
ab. List the locations where placement of erosion
materials is required on weekends and during rain
events.
ac. The areas delineated on the plans for parking,
grubbing, storage, etc., shall not be enlarged or
“run over.”
ad. Construction sites are required to have erosion
control materials on-site during the “off-season.”
ae. Dust control is required year-round.
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 36 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
af. Erosion control materials shall be stored on-site.
ag. Use of plastic sheeting between October 1 and
April 30 is not acceptable, unless for use on
stockpiles where the stockpile is also protected
with fiber rolls containing the base of the
stockpile.
ah. Tree protection shall be in place before any
demolition, grading, excavating or grubbing is
started.
Mitigation Measure Hydro-1b: Stormwater Pollution
Prevention Program. Prior to issuance of grading
permits or approval of improvement plans, the
Applicant shall also submit evidence to the Town
Engineer of Portola Valley showing that coverage
under the Statewide General Construction Activities
Stormwater Permit (General Permit) has been
obtained. The Applicant shall comply with the NPDES
General Construction Activities Storm Water Permit
Requirements established by the CWA. The Applicant
can obtain coverage under the General Permit by filing
a Notice of Intent (NOI) with the State Water Resource
Control Board’s (SWRCB) Division of Water Quality.
The filing shall describe erosion control and storm
water treatment measures to be implemented during
and following construction and provide a schedule for
monitoring performance.
These BMPs shall serve to control point and non-point
source pollutants in stormwater and constitute the
Project’s SWPPP for construction activities. Long-term
BMPs shall serve to control post-construction erosion
and sedimentation. While the SWPPP will include
Prior to issuance of
grading permits or
approval of
improvement plans
Project Sponsor/
Applicant
Verification of Construction
General Permit from the
State Water Resources
Control Board
Verify inclusion of BMPs in
construction contracts
Portola Valley
Planning and
Building
Department
(Town Engineer)
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 37 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
several of the same components as the ESCP, the
SWPPP shall also include BMPs for preventing the
discharge of other nonpoint source pollutants besides
sediment (such as paint, concrete, etc.) to
downstream waters.
Mitigation Measure Hydro-1c: Final Drainage Plan.
Prior to the issuance of the Building permit or
Planning permit (for Provision C3 Regulated Projects),
the Applicant shall submit to the Planning and
Building Department for review and approval a
Drainage Plan including the following:
1. A drainage analysis of the proposed Project
(including the Residential Development Area, trails,
and fire access road) prepared, by a registered civil
engineer. The drainage analysis shall consist of a
written narrative and a plan. The plan shall include
the following:
a. A written analysis that includes the delineation
of all drainage basins to which stormwater from
the Project site would flow, description of
proposed drainage system, discussion of
rationale used to design the system, a
discussion of methods and/or calculations,
description of how excess drainage will be
detained, and a description of how discharge
will be controlled.
b. Complete plans of storm drainage contours and
elevations, storm drain facilities and lines,
utility crossings, and construction materials.
c. The flow of the stormwater onto, over, and off
of the property shall be detailed on the plan
Prior to issuance of
building or planning
permit
Project Sponsor/
Applicant
Verification of submission
and approval of Drainage
Plan
Verification of submission
and approval of Operation
and Maintenance
Agreement
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 38 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
and shall include adjacent lands as appropriate
to clearly depict the pattern of flow.
d. A hydraulic analysis demonstrating that the
post-development discharge will be controlled
and peak flow and velocity will not exceed predevelopment values, and that all storm drainage facilities have sufficient capacity to
carry anticipated peak flows. This analysis shall
consider all facilities including the fire access
road grading and its drainage system. The
condition of the southern culvert underneath
Alpine Road shall be assessed and replacement
or repairs shall be completed as necessary. The
analysis shall detail all measures necessary to
certify adequate drainage. Post development
flows and velocities shall not exceed those that
existed in the pre-developed state.
e. Recommended measures shall be designed and
included in the improvement plans and
submitted to the Planning and Building
Department for review and approval.
2. In addition, once reviewed and approved by the
Town, the Applicant shall record documents which
address future maintenance responsibilities of any
private drainage and/or roadway facilities which
may be constructed. The Applicant or Homeowners
Association must be responsible for proper
maintenance of drainage structures, the
bioretention swale, and equipment on the Project
area. The Applicant must submit an Operation and
Maintenance Agreement for review and approval.
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 39 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
At a minimum, the Operation and Maintenance
Agreement must include the following:
• The contact information for the property
owner(s) or responsible party;
• Identification of the number, type and location
of all stormwater treatment measures on site;
• A list of specific, routine maintenance tasks and
the intervals that they will be conducted; and
• An inspection checklist specific to the
measures, which indicates the items that will be
reviewed during regular maintenance
inspections.
For bioretention areas, the following inspections
must be required:
• Inspect monthly for obstructions and trash.
• Inspect monthly for ponded water. If ponded
water does not drain in 5 days, take the
appropriate action.
If mosquito larvae are observed, contact the San
Mateo County Mosquito Abatement District.
• Inspect monthly for channels, exposure of soils,
or other evidence of erosion. Clear any
obstructions and remove any accumulation of
sediment.
• Inspect biannually for health of plants and
remove dead and diseased vegetation.
• Treat and maintain vegetation and irrigation
system. Minimize use of pesticides and quickrelease synthetic fertilizers.
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 40 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
• Inspect and replace mulch as needed before
wet season.
Mitigation Measure Hydro-1d: Stormwater
Treatment System Operation and Maintenance Plan.
A stormwater treatment system operation and
maintenance plan shall be prepared by the applicant’s
engineer consistent with the San Mateo County Water
Pollution Prevention Program requirements that
describes the type and frequency of ongoing
maintenance required for proper operation of all
post-construction permanent stormwater treatment
measures on the Project site. As a development that is
accessed via a private road, this operation and
maintenance plan shall include maintenance and
cleaning of paved areas to minimize litter and debris
washing into storm drains. This plan shall be
submitted to and must be approved by the City of
Portola Valley Public Works Department prior to first
certificate of occupancy.
Prior to issuance of
certificate of
occupancy permits for
residences
Project Sponsor/
Applicant
Verify submission and
approval of plan
Portola Valley
Public Works
Department
Transportation
Mitigation Measure Trans-2: Trail Crossing Warning.
The Project shall install a sign at the driveways “STOP HERE LOOK FOR TRAIL USERS STOP AGAIN AT ROAD”
for outbound traffic approaching the trail to alert the exiting drivers of the presence of trail users.
Prior to issuance of
certificate of
occupancy permits for
residences
Project Sponsor/
Applicant
Verify improvements have
been implemented
Portola Valley
Public Works
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 41 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
Wildfire
Mitigation Measure Wildfire-2a: Further Increase
Effectiveness of the Vegetation Management Plan.
The Project sponsor shall implement the following
measures to further increase the effectiveness of the
Vegetation Maintenance Plan (VMP), as feasible:
i. While associated with reduction of fuels in the tree canopy, thinning of the oak woodland canopy cover
can promote growth of understory shrubs and
small trees - ladder fuels that contribute to tree
torching, and ember production if not addressed by
other VMP measures. The VMP shall include
discussion and incorporation of the optimal canopy
cover thinning given site characteristics and other
proposed VMP measures.
ii. Consult with the California Department of Fish and
Wildlife to identify any allowable methods to
remove over-abundant fuels in riparian forests and
creekbeds and incorporate identified measures into
the VMP, as feasible.
iii. No mechanical equipment use on days of Red Flag
Warning.
iv. As feasible based on availability of equipment,
utilize equipment with electric motors for VMP
work when ignition potential is higher due to low
moisture in vegetative fuels, generally from May 1
to November 1. Currently available electrical
equipment includes chain saws, leaf blowers, weed
whippers, and push mowers. Larger equipment
may only be available in gas-powered versions, but
Prior to vegetation
management
activities
Project Sponsor/
Applicant
Verify CDFW was consulted
Verify requirements are
included in VMP
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 42 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
should transition to electric-powered versions as
those become electric.
Mitigation Measure Wildfire-2b: Ignition Reduction.
The Project sponsor shall implement the following
measures to further reduce the potential for ignitions
within the Residential Development Area and submit
an annual report to the Town of Portola Valley and
Woodside Fire Protection District verifying ongoing
implementation/enforcement:
i. Annual third-party inspection and certification of
defensible space in community property (areas
within the development area but outside of private
lots).
ii. As feasible, obtain fuel management easements on
adjacent properties where defensible space is not
100-feet from structures to treat fuels
appropriately.
iii. Installation of non-combustible fences on sides as well as rear yards. Solid, non-combustible fences
could form a radiant heat barrier rather than a
source of heat.
iv. Installation and maintenance of ember-resistant
zones 5-feet from side walls, per AB 3074.
v. Prohibition of smoking in common areas.
vi. Provide robust and regular education of residents
regarding ignition prevention.
vii. Outdoor fireplaces and pizza ovens in private yards and in common areas are to be allowed only with
the following provisions:
Prior to issuance of
building or grading
permits
-andPrior to issuance of
certificate of
occupancy permits for
residences
-andAnnually
Project Sponsor/
Applicant
Verify requirements are
included in construction
contracts and are met
during construction
Verify proposed
enforcement documentation
(likely to be through deeds
and/or HOA)
Verify annual
inspection/certifiation
Portola Valley
Planning and
Building
Department
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 43 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
a. The outdoor fireplace or pizza oven is
surrounded by at least 10 feet of noncombustible materials, and b. A water source and a fire extinguisher are both
readily available within 5 feet of the outdoor
fireplace or pizza oven.
viii. Prohibition of a future increase in the existing total surface area of windows on any existing external
wall facing another structure within 30-feet of each
other, unless new window volume has a fireresistance rating of not less than 45 minutes when tested according to National Fire Protection
Association standards.
ix. Installation of two panes of glass on all external
windows, at least one of which shall be tempered
glass.
x. Installation of a radiant heat barrier (such as a
coating of a radiant-heat reflecting material) on all
external walls facing and within 30-feet of another
parallel external wall. A radiant heat barrier is
anything that deflects radiant heat (i.e. is highly
reflective in the visible and near-infrared part of
the electromagnetic spectrum) and includes but is
not limited to a layer of radiant heat reflecting
material or radiant heat reflecting paint/coatings or
masonry (concrete, cinder block, brick).
xi. As feasible based on availability of equipment,
utilize equipment with electric motors for
landscaping work when ignition potential is higher
due to low moisture in vegetative fuels, generally
from May 1 to November 1 or during Red Flag
Warnings indicating higher fire risk. Currently
STANFORD WEDGE HOUSING PROJECT - MMRP PAGE 44 OF 44
Mitigation Measure Timing / Schedule Implementation
Responsibility
Verification
Monitoring Action Monitoring
Responsibility
Date
Completed
available electrical equipment includes chain saws,
leaf blowers, weed whippers, and push mowers.
Larger equipment may only be available in gaspowered versions, but should transition to electricpowered versions as those become electric.
Portola Terrace Homes
Stanford University
Project Narrative
September 23, 2024
Overview
Stanford University (Stanford) proposes to develop a portion of University property (often referred to as the “Stanford Wedge”) in the Town of Portola Valley to create 27 single-family residences for Stanford faculty and 12 affordable multifamily housing units. Approximately 10% of the entire project site would be developed, and the remainder of the
75.4-acre site would be preserved as open space. Development would be clustered in the small portion of the property that is flattest and closest to existing infrastructure.
The project objectives are to:
• Maximize single-family housing opportunities in an area the Town has studied and approved for housing. • Include sufficient affordable housing to make progress toward the Town’s fair share low-income housing needs under the Housing Element of the Town’s General Plan, enable a density bonus, and comply with the Town’s inclusionary housing ordinance.
• Cluster development located closest to existing infrastructure on relatively flat land, in a manner that preserves substantial open space and steep slopes in order to foster a sense of community.
Project Site
The project site is a triangular-shaped property of approximately 75.4 acres commonly called the Stanford Wedge property. It is located immediately west of Alpine Road in the northeastern part of the Town. (APN 077-281-020). The site is largely undeveloped, but the portion of the site proposed for development is currently occupied by the Alpine Rock Ranch, a horse boarding facility with stables. Elevations within the project site range from approximately 323 feet to 678 feet above sea level, but the development site is limited to a relatively flat portion along Alpine Road that is surrounded by steep hillsides to the sides and rear of the property.
The Glenoaks Stables are located across Alpine Road from the southeastern boundary of the site. Single-family homes are located to the north, west, and south of the project site.
The property is designated “Conservation-Residential” in the General Plan. That designation includes relatively accessible undeveloped lands with some potential geologic instabilities, which are to be developed using a slopeintensity standard. The Town’s 2015 Housing Element contemplates single-family homes on the site and affordable housing that can help meet the Town’s Regional Housing Needs Allocation (RHNA) requirements.
The site is zoned Residential Estate (R-E) and is subject to the 3.5A residential density combining district, the SD-2 slope-density combining district, and the D-R design review combining district.
Physical Development
The maximum allowable density at the site is governed by the Municipal Code and the State Density Bonus Law (Government Code section 65915). Municipal Code sections 18.50.040 and 18.50.050(A) impose a slope-density formula that yields just over 20 lots for the site. Municipal Code sections 17.20.215, 18.04.055 and 18.44.060(H) allow and require inclusionary housing that may be configured as multifamily housing, resulting in a maximum base density of 18 single-family units and 12 multifamily affordable units (or 30 total base units). By restricting 20% of these units to low-income households, the project qualifies under state law for a 35% density bonus, which would allow 11 additional market-rate units. The project proposes 9 units rather than 11 bonus market-rate units, resulting in a total of 27 market-rate single-family homes and 12 affordable multifamily units on a total of 30 developable lots.
This actual development footprint would be clustered on roughly 6 acres (or 8% of the total site area) of the flattest and most readily developable area of the property next to Alpine Road.
The 27 single-family homes would be located on clustered lots as a planned unit development. Most of these homes would be separated from each other, while 6 of the homes would be configured into 3 duets. Each single-family home would be located on its own lot. The homes would be two stories, each having three or four bedrooms and a study. No accessory dwelling units would be constructed as part of the project. The single-family homes are anticipated to range from approximately 1,800 square feet to 2,100 square feet. Parking in the amounts required by the State Density Bonus Law would be accommodated through a combination of one-car garages and uncovered parking spaces primarily located on each lot. Lot sizes would be in the range of 3,300 to 4,800 square feet. These lot sizes are smaller than those permitted by local zoning but would be permitted pursuant to a State Density Bonus Law incentive/concession. The individual homes would have private fenced rear yards. Each single-family lot would be subject to a ground lease.
The floor areas for different unit types represent gross areas. Gross areas were calculated by summing all of the area within the face of exterior walls at each floor of the building. Stairs are only counted towards the area of the first floor of the building.
Affordable units
Under the Town of Portola Valley’s inclusionary lot requirements, three lots must be developed as affordable housing. Up to 4 affordable units may be placed on each lot provided under the inclusionary housing program, allowing up to 12 multifamily affordable units on the property. At least 6 of the 12 affordable units would be set aside for low-income households.
The 12 multifamily rental units would be clustered on three lots of approximately 6,200 to 8,300 square feet each, with a four-unit building on each lot. Each multifamily building would contain two studio units (approximately 475 SF each), one 1-bedroom unit (approximately 600 SF), and one 2-bedroom unit (approximately 975 SF). The project would provide parking consistent with the requirements of the State Density Bonus Law.
Architectural Style
The intent of the town of Portola Valley Design guidelines are to encourage architectural design that is:
• responsive to the site;
• in harmony with the natural environment;
• compatible with the surrounding neighborhood;
• in keeping with the rural character of the town.
Colors and materials:
• Use colors and materials that blend with the natural environment. • Do not use highly reflective colors and surfaces.
• Concrete driveways visible from off-site should be darkened to blend with the natural environment. • For new construction and remodeling projects that come before the ASCC, colors shall be subject to ASCC approval. The reflectivity value for colors should not exceed 40%, except that the colors for trim should not have a reflectivity value over 50%.
• Homeowners and developers are encouraged to follow the above reflectivity values when repainting buildings.
• Light colored roofs are discouraged and in general should not exceed a reflectivity value of 40%, especially if visible from off site.
The architectural style of the single-family homes and the multifamily buildings could be characterized as traditional in form and modern in execution. Simple gable roof forms, two-story bays, and covered entries would be clad in painted cement fiber siding with wood accents, standing seam metal roofs, and large metal-clad wood windows with narrow trim and crisp detailing. Colors would be muted; gray to gray-blue tones—typically with two colors per building, and gray metal roofs. All colors were selected to meet the Town’s reflectivity values.
Wildfire Management
The buildings as proposed would comply with Wildland Urban Interface (WUI) materials and construction methods for exterior wildfire exposure as required per CBC 701A.3, CRC R337.1.3. All buildings would be equipped with an automatic sprinkler system. A defensible space area within 0
-5’ of the building would be noncombustible. A 4”
000335
vertical noncombustible separation zone on the building would be maintained between the siding and the ground plane (or other built horizontal surfaces).
The proposed buildings would be built with WUI materials and comply with construction methods for wildfire exposure, including:
• Roofs of metal or tile.
• Protected vents in eaves or cornices with baffles to block embers. • Eaves and soffits protected with ignition-resistant or non-combustible materials. • Dual-paned windows with one pane of tempered glass to reduce the chance of breakage in a fire. • Walls made of ignition resistant building materials, such as fiber cement, wall siding, fire retardant, treated wood, stucco, or other approved materials.
• Decks (if provided) would be built with ignition-resistant, non-combustible, or other approved materials.
In addition, a Zone 1 wildfire protection area, consisting of irrigated, low-fuel landscaping would be established around the perimeter of the buildings and common open space areas within the development area. A Zone 2 defensible space would be established, where grasses are kept mowed, dead plant material is removed, and space is kept between shrubs, larger trees, and other combustible materials, would be maintained within 200’ of buildings.
Further out, shaded fuel breaks may be used to reduce the fuel load in the surrounding area. The Zone 1 and Zone 2 areas would be owned and maintained by the project homeowner’s association.
As part of the initial review of the project application, the Town of Portola Valley Planning and Building Department routed the application to the Woodside Fire Protection District (WFPD) for review and comment. The WFPD, in review of the application and site plans, required preparation of a Vegetation Management Plan (VMP or plan) to address existing fire hazards across the parcel through fire behavior modeling and to define mitigations to reduce the hazards identified during modeling. On May 5, 2020, Stanford submitted a Vegetation Management Plan to the WFPD and the Town of Portola Valley as a supplement to its application PLN_ARCH0021-2019 for the Stanford University Faculty Housing Project.
In addition, the WFPD requested an access point to be created in approximately the middle of the development between structures. This access point would be a minimum of 12 feet wide access and consist of an all-weather drivable surface to access the undeveloped remainder parcel behind the development for maintenance and emergency vehicle access/egress and defense. The project layout was modified to conform to this requested access.
Project Layout
The project would be configured as shown in the submittal package. Residential units would be constructed on both sides of a new, private loop road that connects at both ends to Alpine Road. This layout is proposed pursuant to a State Density Bonus Law incentive/concession for relief from the development standard in paragraph 2105.4 of the General Plan Land Use Element, to the extent this provision could be read to apply to the proposed project. That paragraph otherwise might be read to require a layout that includes several small, separated clusters of houses, each with substantial direct frontage on common open space.
The project would include common open space areas, which could be used for recreational purposes. These open space areas include areas that front Alpine Road, creating a visual buffer between the road and the project. Aside from the approximately 6 acres of the project site that would be developed, the remainder of the site would be protected from development by an appropriate legal instrument.
The amount of grading, and cut and fill, are shown conceptually in the plan submittal. The project has been designed so that the grading of the site would “balance”, meaning that dirt brought onto or hauled off the site during grading activities would be minimized.
As a provision of the Vegetation Management Plan, Stanford is proposing the construction of a permanent maintenance road. The purpose of this access road is to provide access into presently inaccessible portions of the site to facilitate annual vegetation management of the undeveloped portions of the site for the off-hauling of materials to a composting site. The access road (which can later be used for access by fire personnel in the event of a wildfire) would provide access and staging and would serve as central landing areas to collect material for off hauling.
Trails
As requested by Town of Portola Valley staff, Stanford has proposed trail routes totaling approximately 1.2 miles in length consistent with or equivalent to the potential routes shown on Diagram A of the General Plan’s Trails and Paths Element. The trail routes are:
• Alpine Road Trail
• Portola Terrace Looped Trail
In developing our proposed trail routes, Stanford overlaid the conceptual routes shown in the Trails and Paths Element of the Town’s General Plan (Diagram A) onto a more detailed topographic map of the Stanford property.
Stanford then analyzed this exhibit and made some alterations to the routes to avoid extreme slopes. These variations are consistent with Principle 3210.1.g of the Trails and Paths Element, which states that trails and paths should “disturb the natural conditions of terrain and vegetation as little as possible.” Stanford then made further alterations to the routes to avoid features like potential wetlands and potential riparian corridors, in accordance with State and Federal environmental laws. These variations also are consistent with both Objective 3209.1.i of the Trails and Paths Element, which states that newly created trails should “ensure that such facilities are designed and used so as to avoid habitat degradation,” as well as Principle 3210.1.p, which calls for designing trails “so as to minimize changes in the natural flow of water across the land.” (For a complete explanation of Stanford’s trail proposal, please refer to the letter from Stanford University to Howard Young, Town of Portola Valley Public Works Director dated May 26, 2020, which is also included in our July 2020 submittal package.) Sustainability
In addition to compliance with the new 2019 Building Energy Efficiency Standards, which require zero net electricity development, including solar electricity generation on-site, and compliance with Town of Portola Valley’s “Green Building” code sections, the project would include the following sustainability features that are not required by regulations or ordinances:
• One Level 2 electric vehicle charging station installed in each single-family residence garage. • All-electric construction with no natural gas connections. • Future homes will be offered to Stanford faculty thus creating a strong jobs-to-housing balance on Stanford lands. This reduces vehicle miles traveled and reduces vehicle emissions.
Funding of Private Amenities
A homeowner’s association or similar mechanism would be used to fund maintenance of:
• Common areas near the residences, including open space/recreational areas, landscaping, and stormwater detention/treatment areas;
• Front yards of the homes;
• Private internal loop street;
• Private segments of utilities; and
• Areas designated as fuel management fire protection areas around the perimeter of the homes.
Stanford University would fund maintenance of the natural undeveloped area located further from the residential units and outside the Zone 1 and Zone 2 wildfire protection areas.
Grading
The philosophy behind developing a grading plan for a residential subdivision is rooted in several key principles that prioritize functionality, sustainability, and community well-being. In the case of the Portola Terrace, the project is proposing a cluster subdivision with relatively small homes and lots. While this type of residential home is very commonplace and popular throughout California, Portola Terrace is introducing this type of neighborhood to Portola Valley. The following is the grading philosophy for the Portola Terrace project:
1. Balance and Harmony with Nature
• The project civil engineers must work with the natural contours of the land with the goal of minimizing disruption to the existing landscape. This approach helps maintain natural drainage patterns and preserves the ecological integrity of the site. • Because of the nature of the design of the homes on relatively small lots, the project architect and civil engineer have worked closely together to design a “system wide” grading plan where all lots and adjacent loop street are designed as an integrated package. • Environmental Protection: The civil engineer has identified all existing environmental elements that require attention. In the case of the Portola Terrace site, the project architect and project arborist work with the civil engineer to preserve as many existing trees as possible.
2. Functionality and Usability
• Accessibility: The grading plan must facilitate safe access for vehicles and pedestrians. This includes designing roads, driveways, and walkways that are both functional and aesthetically pleasing while meeting the requirements of the town of Portola Valley and the Woodside Fire Protection District.
• Site Drainage: A critical aspect is ensuring proper drainage to prevent flooding and erosion. The project civil engineer has designed systems that manage stormwater effectively, enhancing both safety and usability.
3. Sustainability
• Resource Efficiency: The grading plan for the site has minimized the need for excessive earthmoving, reducing construction costs and environmental impact. Working with the project’s geotechnical consultants, the civil engineer aims for a balanced cut-and-fill approach to maintain existing soil and reduce waste, and lessen construction emissions and dust. • Long-Term Viability: Sustainable practices, such as incorporating green infrastructure (like bioswales or permeable surfaces), are encouraged to manage water on-site and promote groundwater recharge.
4. Public Safety and Aesthetics
• Attention is given to the visual impact of grading and the long-term safety of residents, ensuring that slopes and grading transitions are gradual and well-defined.
5. Regulatory Compliance
• Adherence to Standards: Engineers must navigate a complex landscape of local regulations, ensuring that their grading plans meet all legal requirements while also serving the community’s best interests.
Relationship between Town Height Requirements and the Planned Unit Development regulations.
The town of Portola Valley measures building height from the natural grade not finished pad elevation, provided a pad is not excavated below natural ground level. Therefore, a building that, in isolation, is 28 feet in height may actually exceed the Town’s 28-foot height limit if you factor in the amount of fill beneath the house. This situation occurs on lots 12, 19, 20, 22/23 (duet unit) 24, 25 and the three BMR structures in the proposed project as depicted on Sheets A0.03 and A0.04 of the application.
The Town’s Zoning Code (section 18.54.030(E)) authorizes exceptions to height requirements as part of an approved planned unit development (PUD). The applicant is requesting that the above height exceptions be granted as part of the PUD. Alternatively, in the event the Town chooses not to grant exceptions through the PUD process, the applicant requests a waiver of the applicable Town height standards under the Density Bonus Law (Gov’t Code section 65915(e)(1)), as application of these standards would have the effect of physically precluding construction of the project.
Infrastructure
As noted, the project would include a new private road that starts on Alpine Road, runs through the developed area, and terminates at another location on Alpine Road. Utilities would be installed underneath the new private road, and then extended to individual residences as necessary.
The project anticipates receiving utility service from the following providers:
• Electricity: Pacific Gas & Electric Company
• Solid Waste & Recycling: GreenWaste Recovery, Inc.
• Water: California Water Services Company
• Sewer: West Bay Sanitary District
The project would construct sewer and water lines from existing mains located in Alpine Road to reach the project site. (In the case of water, a new water line would be extended within Alpine Road to the nearest water connection point as determined by California Water Services Company.) The project would fund or construct such offsite improvements as are needed to create additional capacity to serve the incremental demand of the project.
Stormwater management would be accommodated on site through the use of stormwater detention and bioretention treatment facilities. The project would be designed to meet the stormwater treatment quality standards stated in the C.3 Stormwater Technical Guidance and the stormwater runoff quantity and rates stated in the “Hydromodification Management” guidelines.
Construction
All project construction would occur by or under the direction of Stanford, without custom development of homes.
Depending on when project approvals are obtained, construction is anticipated to commence in spring 2021 and take approximately 24 – 30 months. Site grading activities would take approximately six to eight months, and would utilize equipment that meets BAAQMD Tier Four requirements.
Construction would require removal of 177 (123 listed as “significant” and 54 “non-significant” trees) of the project site’s existing trees as outlined on sheet 3.1 of the Vesting Tentative Map package. (Note: This number may change as the project is reviewed by the Town of Portola Valley.) As part of the construction of the Project, 55 new trees would be planted, as outlined on sheet L3.1 of the Landscape Plans contained on the ASCC submittal package. (Note: This number was reduced from previous submittals based on comments received by Town committees and the WFPD.)
1 A101
SIM
A101
1 Ref
1 R
ef
1 R
ef
1 Ref
Name
Elevation
A101
1 SIM
1 View Name
1/8" = 1'-0"
1t
101
1i
1 A101
1 Ref
INTERIOR ELEVATION
ELEVATION LETTER
SHEET NUMBER
ELEVATION
DRAWING NUMBER
SHEET NUMBER
SECTION
DRAWING NUMBER
SHEET NUMBER
DETAIL
DRAWING NUMBER
SHEET NUMBER
GRIDLINE
ELEVATION MARKER
SHEET TITLE
SCALE
WINDOW TAG
DOOR TAG
WALL TAG
REVISION CLOUD
1 R
ef
1 Ref
1 R
ef
0 10-31-21
Project ID:
Plot Date:
Drawn by:
Checked by:
Project Title:
Design Firm:
Consultant:
Stamp:
Issue Note:
Sheet No.:
Sheet Title:
File Name:
Scale:
6201 Doyle Street, Suite B
Emeryville, CA 94608
TEL 510 / 547-8092
FAX 510 / 547-2604
[email protected]
12" = 1'-0"
11/10/2020 9:14:14
A
M
G0.00
COVER SHEET
17-034 SPVH PORTOLA TERRACE
STANFORD UNIVERSITY
11/10/20
LL
LS
SFH_CENTRAL
ASCC
SUBMITTAL
11/10/20 Alpine Road, Portola Valley, CA 94028
APN#: 077281020
Client
Stanford University
Land, Building, and Real Estate
415 Broadway, 3rd Floor
Redwood City, CA 94063
Contact: John Donahoe
T: (650) 724-4913
E: [email protected]
PROJECT TEAM
Design 27 Stanford Faculty homes and 12 below
market rate (BMR) rental units in three 4-unit buildings on approximately 6 acres of a 75 acre parcel in Portola Valley. Faculty housing is a mix of three and four
bedroom, two story, single family and duplex homes,
with attached one car garages and one off-street
parking space. Each 4-unit BMR building includes 5 offstreet parking spaces. Shared common space includes a central playground / picnic area and 20 visitor parking spaces.
Landscaping will utilize native, drought tolerant plants.
Site goals include minimizing grading, retaining
existing trees and preserving the scenic view corridor
along Alpine road.
PROJECT DESCRIPTION
SHEET INDEX
G0.00 COVER SHEET
G0.01 EXISTING CONDITIONS PHOTOS
G0.02 RENDERINGS - ALPINE ROAD
G0.03 RENDERINGS - INTERNAL NEIGHBORHOOD
G0.04 RENDERED NEIGHBORHOOD ELEVATIONS
G1.01 CODE SUMMARY & ABBREVIATIONS
G1.02 GREEN BUILDING ORDINANCE DOCUMENTATION
G1.03 GREEN BUILDING ORDINANCE DOCUMENTATION
--CIVIL--
C-1.0 COVER SHEET
C-2.0 TOPOGRAPHIC SURVEY
C-2.1 TOPOGRAPHIC SURVEY
C-3.0 LOT AND PARCEL PLAN
C-3.1 LOT AND PARCEL PLAN
C-3.2 LOT AND PARCEL PLAN
C-4.0 DEMOLITION PLAN
C-4.1 TREE DISPOSITION
C-4.2 TREE DISPOSITION
C-5.0 GRADING AND DRAINAGE PLAN
C-5.1 GRADING AND DRAINAGE PLAN
C-5.2 SECTIONS
C-5.3 TRAIL MAP
C-6.0 UTILITY PLAN
C-6.1 UTILITY PLAN
C-6.2 UTILITY PLAN
C-7.0 STORMWATER MANAGEMENT PLAN
C-8.0 WATER POLLUTION CONTROL PLAN
C-8.2 BEST MANAGEMENT PRACTICES
C-9.0 FIRE ACCESS PLAN
--LANDSCAPE--
L-0.0 TITLE SHEET
L-2.1 SITE DETAILS AND ELEVATIONS
L-3.1 PLANTING PLAN AND SCHEDULE
L-4.1 IRRIGATION PLAN
L-4.2 IRRIGATION PLAN
L-4.3 IRRIGATION PLAN
L-4.4 IRRIGATION NOTES AND LEGEND
L-4.5 IRRIGATION DETAILS
L-4.6 IRRIGATION DETAILS
L-4.7 IRRIGATION DETAILS
L-4.8 IRRIGATION WORKSHEETS
L-5.1 LIGHTING PLAN
L-5.2 LIGHTING DETAILS
--ARCHITECTURAL--
A0.01 ARCHITECTURAL SITE PLAN
A0.01A ARCHITECTURAL SITE PLAN - ENLARGED
A0.01B ARCHITECTURAL SITE PLAN - ENLARGED
A0.01C ARCHITECTURAL SITE PLAN - ENLARGED
A0.02 LOT PLANS & PARKING DIAGRAMS
A0.03 BUILDING HEIGHT DIAGRAMS
A0.04 BUILDING HEIGHT DIAGRAMS - BMR
A1-2.01 3 BEDROOM FLOOR PLAN
A1-2.02 3 BEDROOM ROOF PLAN
A1-3.01 3 BEDROOM ELEVATIONS
A1-4.01 3 BEDROOM SECTIONS
A2-2.01 4 BEDROOM FLOOR PLAN
A2-2.02 4 BEDROOM ROOF PLAN
A2-3.01 4 BEDROOM ELEVATIONS
A2-4.01 4 BEDROOM SECTIONS
A3-2.01 DUET FLOOR PLAN
A3-2.02 DUET FLOOR PLAN
A3-2.03 DUET ROOF PLAN
A3-3.01 DUET ELEVATIONS
A3-3.02 DUET ELEVATIONS
A3-4.01 DUET SECTIONS
A4-2.01 BMR BUILDING FLOOR PLAN
A4-2.02 BMR BUILDING FLOOR PLAN
A4-2.03 BMR BUILDING ROOF PLAN
A4-3.01 BMR BUILDING ELEVATIONS
A4-3.02 BMR BUILDING ELEVAITONS
A4-4.01 BMR BUILDING SECTIONS
VICINITY AND CONTEXT MAP
Civil
Sandis
1700 S. Winchester Blvd. #200
Campbell, CA 95008
Contact: Nate Dickinson
T: (408) 636-0900
E: [email protected]
PROJECT SITE
APN: 077281020
SYMBOLS
The site is designated Residential Estate (R-E)/3.5A, and is subject to the Slope Density (SD-2) and Design-Review (D-R) overlay districts.
Unless otherwise indicated, the information below is the existing zoning regulations/requirements in place for the site. Deviations from these regulations/requirements will be defined in the PUD application.
APN: 77281020
Zoning Use District: R-E, Residential Estate (Existing) Combining District: 3.5A, D-R (Existing)
Slope Density Designation: SD-2 (Existing, no change)
Total Site Acerage: 75.4 acres (3,284,424 sf)
Proposed House Lot Size: 3,450 - 4,850 sf @ single family & duplex homes
5,400 - 6,700 sf @ BMRs
ZONING SUMMARY
2019 CALIFORNIA BUILDING CODE (CBC)
2019 CALIFORNIA PLUMBING CODE
2019 CALIFORNIA MECHANICAL CODE
2019 CALIFORNIA ELECTRICAL CODE
2019 CALIFORNIA ENERGY CODE
2019 CALIFORNIA FIRE CODE
2019 CALIFORNIA CALGREEN CODE
2019 CALIFORNIA RESIDENTIAL CODE
2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
PORTOLA VALLEY MUNICIPAL CODES AND ALL
OTHER APPLICABLE STATE AND LOCAL
ORDINANCES AND REGULATIONS.
APPLICABLE CODES
Architect
Siegel & Strain Architects
6201 Doyle St., Suite B
Emeryville, CA 94608
Contact: Larry Strain, FAIA
T: (510) 547-8092
E: [email protected]
Landscape
Lutsko Associates
3295 Mission St.
San Francisco, CA 94110
Contact: Ron Lutsko
T: (415) 920-2800
E: [email protected]
No. Description Date
PLANNING REV. 1 11/15/19
PLANNING REV. 3 11/10/20
Parking:
State Density Bonus Law Requirements
Spaces for 4-bedrm units (2.5 spaces/unit): 20
Spaces for 3-bedrm units (2 spaces/unit): 38
Spaces for 2-bedrm units (2 spaces/unit): 6
Spaces for studio/1-bedrm units (1 space/unit): 9
Total required by State Density Bonus: 73
Proposed Parking
Garage/driveway spaces proposed: 60
Standard onsite spaces proposed: 24
Accessible onsite spaces proposed: 5
Total proposed parking spaces: 89 (Includes resident
& guest spaces)
L0.0
L1.1
L2.1
L3.1
L3.2
L4.1
L4.2
L4.3
L4.4
L4.5
L4.6
L4.7
L4.8
L5.1
L5.2
TITLE SHEET
MATERIAL AND FINISHES PLAN
SITE DETAILS
PLANTING PLAN
PLANTING BLOW-UP PLAN
IRRIGATION PLAN
IRRIGATION PLAN
IRRIGATION PLAN
IRRIGATION NOTES AND LEGEND
IRRIGATION DETAILS
IRRIGATION DETAILS
IRRIGATION DETAILS
IRRIGATION WORKSHEETS
LIGHTING PLAN
LIGHTING CUTSHEETS
--ARCHITECTURAL--
A0.01 ARCHITECTURAL SITE PLAN
A0.01A ARCHITECTURAL SITE PLAN - ENLARGED
A0.01B ARCHITECTURAL SITE PLAN - ENLARGED
A0.01C ARCHITECTURAL SITE PLAN - ENLARGED
A0.02 LOT PLANS & PARKING DIAGRAMS
A0.03 BUILDING HEIGHT DIAGRAMS
A0.04 BUILDING HEIGHT DIAGRAMS - BMR
A1-2.01 3 BEDROOM FLOOR PLAN
A1-2.02 3 BEDROOM ROOF PLAN
A1-3.01 3 BEDROOM ELEVATIONS
A1-4.01 3 BEDROOM SECTIONS
A2-2.01 4 BEDROOM FLOOR PLAN
A2-2.02 4 BEDROOM ROOF PLAN
A2-3.01 4 BEDROOM ELEVATIONS
A2-4.01 4 BEDROOM SECTIONS
A3-2.01 DUET FLOOR PLAN
A3-2.02 DUET FLOOR PLAN
A3-2.03 DUET ROOF PLAN
A3-3.01 DUET ELEVATIONS
A3-3.02 DUET ELEVATIONS
A3-4.01 DUET SECTIONS
A4-2.01 BMR BUILDING FLOOR PLAN
A4-2.02 BMR BUILDING FLOOR PLAN
A4-2.03 BMR BUILDING ROOF PLAN
A4-3.01 BMR BUILDING ELEVATIONS
A4-3.02 BMR BUILDING ELEVAITONS
A4-4.01 BMR BUILDING SECTIONS
noono;sw,ct Q
I
.....
395(:aban• Q
◊
0 I C)
◊
0----
Woodl•ndSchoo!
9 ... ,;, '
I
,
q
i
I ,,., ..
Q l.adenr, Ooko SWirn
& lenru~Club
11'11 L-• Commu T Chun;h UCC n~y
F«dfleld Q
/.
t
J
l
,.,
.,
PegeM,111'.-1<&- 9
j
.,
"'1\.. 100011~---~
"
I SIEGEL & STRAIN Architects
A - ALPINE ROAD LOOKING NORTH
D
- ALPINE ROAD LOOKING SOUTH
B - ALPINE ROAD LOOKING NORTH
C - ALPINE ROAD LOOKING SOUTH
ALPINE RD.
A
BDC
10-31
-21
Project ID:
Plot Date:
Drawn by:
Checked by:
Project Title:
Design Firm:
Consultant:
Stamp:
Issue Note:
Sheet No.:
Sheet Title:
File Name:
Scale:
6201 Doyle Street, Suite B
Emeryville, CA 94608
TEL 510 / 547-8092
FAX 510 / 547-2604
[email protected]
As indicated
11/10/2020 9:14:16 AM
G0.01
EXISTING
CONDITIONS
PHOTOS
17-034 SPVH PORTOLA TERRACE
STANFORD UNIVERSITY
11/10/20
Author
Checker
SFH_CENTRAL
ASCC
SUBMITTAL
11/10/20 Alpine Road, Portola Valley, CA 94028
APN#: 077281020
12" = 1'-0"
1 EXISTING CONDITIONS - ALPINE ROAD VIEWS
No. Description Date
I SIEGEL & STRAIN Architects I
OAR
cY MA(o
_, C 25636 <" :...\
A - ALPINE ROAD LOOKING NORTH
D
- ALPINE ROAD LOOKING SOUTH
B - ALPINE ROAD LOOKING NORTH
C - ALPINE ROAD LOOKING SOUTH
NOTE:
TREES LOCATED WITHIN THE ALPINE
ROAD RIGHT-OF-WAY WILL BE SUBJECT
TO ADDITIONAL REVIEW AND POTENTIAL
REMOVAL AS DETERMINED BY FINAL
CONDITIONS OF APPROVAL ESTABLISHED
BY THE TOWN OF PORTOLA VALLEY
ALPINE RD.
A
BDC
10-31
-21
Project ID:
Plot Date:
Drawn by:
Checked by:
Project Title:
Design Firm:
Consultant:
Stamp:
Issue Note:
Sheet No.:
Sheet Title:
File Name:
Scale:
6201 Doyle Street, Suite B
Emeryville, CA 94608
TEL 510 / 547-8092
FAX 510 / 547-2604
[email protected]
As indicated
11/10/2020 9:14:19 AM
G0.02
RENDERINGS -
ALPINE ROAD
17-034 SPVH PORTOLA TERRACE
STANFORD UNIVERSITY
11/10/20
LL
LS
SFH_CENTRAL
ASCC
SUBMITTAL
11/10/20 Alpine Road, Portola Valley, CA 94028
APN#: 077281020
1 RENDERINGS - PROPOSED ALPINE ROAD VIEWS
No. Description Date
PLANNING REV. 1 11/15/19
.
,.
"' ' t,!" .. ;, ' - ✓.•
-
SIEGEL & STRAIN Architects
OARc
cY MA(o
C 25636 <" ~
A - INTERNAL NEIGHBORHOOD VIEW LOOKING NORTH
B - INTERNAL NEIGHBORHOOD VIEW LOOKING AT THE COMMON OPEN SPACE (E) TREE
(N) TREE
(N) TREE
(E) TREE
(N) TREE
(N) TREE
(N) TREE
A - INTERNAL NEIGHBORHOOD VIEW LOOKING NORTH
(EXISTING & PROPOSED TREES NOT SHOWN)
B - INTERNAL NEIGHBORHOOD VIEW LOOKING AT THE COMMON OPEN SPACE (EXISTING & PROPOSED TREES NOT SHOWN)
10-31-21
Project ID:
Plot Date:
Drawn by:
Checked by:
Project Title:
Design Firm:
Consultant:
Stamp:
Issue Note:
Sheet No.:
Sheet Title:
File Name:
Scale:
6201 Doyle Street, Suite B
Emeryville, CA 94608
TEL 510 / 547-8092
FAX 510 / 547-2604
[email protected]
12" = 1'-0"
11/10/2020 9:14:22 A
M
G0.03
RENDERINGS -
INTERNAL
NEIGHBORHOOD
17-034 SPVH PORTOLA TERRACE
STANFORD UNIVERSITY
11/10/20
LL
LS
SFH_CENTRAL
ASCC
SUBMITTAL
11/10/20 Alpine Road, Portola Valley, CA 94028
APN#: 077281020
1 RENDERINGS - NEIGHBORHOOD INTERNAL VIEWS
2 RENDERINGS - NEIGHBORHOOD INTERNAL VIEWS
WITHOUT EXISTING & PROPOSED TREES
No. Description Date
PLANNING REV. 1 11/15/19
I SIEGEL & STRAIN Architects I
ARc
MA(o
5636
10 -31
-21
Project ID:
Plot Date:
Drawn by:
Checked by:
Project Title:
Design Firm:
Consultant:
Stamp:
Issue Note:
Sheet No.:
Sheet Title:
File Name:
Scale:
6201 Doyle Street, Suite B
Emeryville, CA 94608
TEL 510 / 547-8092
FAX 510 / 547-2604
[email protected]
1/8" = 1'-0"
11/10/2020 9:14:25 AM
G0.04
RENDERED
NEIGHBORHOOD
ELEVATIONS
17-034 SPVH PORTOLA TERRACE
STANFORD UNIVERSITY
11/10/20
Author
Checker
SFH_CENTRAL
ASCC
SUBMITTAL
11/10/20 Alpine Road, Portola Valley, CA 94028
APN#: 077281020
1/8" = 1'-0" 2. STREETSCAPE ELEVATION 1
1/8" = 1'-0"
1 STREETSCAPE ELEVATION 2
No. Description Date
PLANNING REV. 1 11/15/19
I SIEGEL & STRAIN Architects I
OAR
c'i MAlo
C 25636 '{:-
10-31-21
Project ID:
Plot Date:
Drawn by:
Checked by:
Project Title:
Design Firm:
Consultant:
Stamp:
Issue Note:
Sheet No.:
Sheet Title:
File Name:
Scale:
6201 Doyle Street, Suite B
Emeryville, CA 94608
TEL 510 / 547-8092
FAX 510 / 547-2604
[email protected]
11/10/2020 9:14:25 A
M
G1.01
CODE SUMMARY
&
ABBREVIATIONS
17-034 SPVH PORTOLA TERRACE
STANFORD UNIVERSITY
11/10/20
LL
LS
SFH_CENTRAL
ASCC
SUBMITTAL
11/10/20 Alpine Road, Portola Valley, CA 94028
APN#: 077281020
AB ANCHOR BOLT; ABOVE
AC ASPHALT CONCRETE
ACT ACOUSTICAL CEILING TILE
ACOUS; ACST ACOUSTIC
ADDL ADDITIONAL
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHD AIR HAND DRYER
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECT
AV AUDIO VISUAL
BB BASEBOARD
BD BOARD
BEDRM BEDROOM
BFP BACK FLOW PREVENTER
BLDG BUILDING
BMR BELOW MARKET RATE
BO BOTTOM OF
BOF BOTTOM OF FIXTURE
BOT BOTTOM
B PL BASE PLATE
BTWN BETWEEN
CAB CABINET
CEM CEMENTITIOUS
CER CERAMIC
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CPT CARPET
CTR CENTER
DC DIAPER CHANGING STATION
DET DETAIL
DEMO DEMOLITION
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DOUG FIR DOUGLAS FIR
DG DECOMPOSED GRANITE
DN DOWN
DWG DRAWING
DS DOWNSPOUT
E EAST
(E);EXIST EXISTING
EA EACH
ECU EVAPORATIVE COOLING UNIT
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
EQ EQUAL
EV ELECTRIC VEHICLE
EW EACH WAY
EXP EXPANSION
EXT EXTERIOR
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FHMS FLAT HEAD METAL SCREW
FIN FINISH
FIN FLR FINISH FLOOR
FIXT FIXTURE
FLASH FLASHING
FLUOR FLUORESCENT
FDTN FOUNDATION
FO FACE OF
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOS FACE OF STUD
FLR FLOOR
FPL FIREPLACE
FRP FIBERGLASS REINFORCED PLASTIC
FT FOOT OR FEET
FTG FOOTING
FURG FURRING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GL GLASS
GLU LAM GLUED LAMINATED LUMBER
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
HB HOSE BIBB
HCWD HOLLOW CORE WOOD DOOR
HD HAND DRYER
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORZ; HORIZ HORIZONTAL
ID INSIDE DIAMETER
INS; INSUL INSULATION
INT INTERIOR
ISO ISOMETRIC
JAN CLO JANITOR CLOSET
J-BOX JUNCTION BOX
JT JOINT
KIT KITCHEN
K/L/D KITCHEN/LIVING/DINING
KPL KICK PLATE
LAM GL LAMINATED GLASS
LAV LAVATORY
LINO LINOLEUM
LT LIGHT
MAX MAXIMUM
MC MEDICINE CABINET
MECH MECHANICAL
MEMB MEMBRANE
MFR; MNFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
MW MICROWAVE
N NORTH
(N) NEW
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
O/ OVER
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
PERF PERFORATED
PL PROPERTY LINE
PLAS PLASTER
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PN PROJECT NORTH
PR PAIR
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER; PAINTED
PV PHOTOVOLTAIC
R RISER; RADIUS
RCP REFLECTED CEILING PLAN
REC RECOMMENDED
REQD REQUIRED
REF REFRIGERATOR
REV REVERSE
RH ROBE HOOK
RM ROOM
RO ROUGH OPENING
RWL RAIN WATER LEADER
ABBREVIATIONS
S SOUTH
SC SOLID CORE; SHOWER CURTAIN
SCD SEE CIVIL DRAWINGS
SCHED SCHEDULE
SD SMOKE DETECTOR; SOAP DISPENSER
SED SEE ELECTRICAL DRAWINGS
SF SQUARE FOOT (FEET)
SG SAFETY GLAZING
SHT SHEET
SIM SIMILAR
SFSD SEE FOOD SERVICE DRAWINGS
SLD SEE LANDSCAPE DRAWINGS
SMD SEE MECHANICAL DRAWINGS
SND SANITARY NAPKIN DISPENSER
SPD SEE PLUMBING DRAWINGS
SPVD SEE PHOTOVOLTAIC DRAWINGS
SQ SQUARE
SR SHOWER ROD
SS SHOWER SEAT
SSD SEE STRUCTURAL DRAWINGS
SST; SSTL STAINLESS STEEL
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
SYMM SYMMETRICAL
T TREAD
TB TOWEL BAR
TEL TELEPHONE
THRU THROUGH
TO TOP OF
TOS TOP OF SLAB
TP; TPD TOILET PAPER DISPENSER
TS TUBE STEEL
TYP TYPICAL
T&G TONGUE & GROOVE
TV TELEVISION
UBC UNIFORM BUILDING CODE
UO UNDERSIDE OF
UON UNLESS OTHERWISE NOTED
UR URINAL
UTIL UTILITY
VAR VARIES
VERT VERTICAL
VG VERTICAL GRAIN
VIF VERIFY IN FIELD
W WEST
W/ WITH
WC WATER CLOSET
WO WHERE OCCURS
W/O WITHOUT
WD WOOD
WDW WINDOW
WH WATER HEATER
WP WATER PROOF; WATERPROOFING
WR WASTE RECEPTACLE
WWM WELDED WIRE MESH
2019 CALIFORNIA BUILDING CODE (CBC)
2019 CALIFORNIA PLUMBING CODE
2019 CALIFORNIA MECHANICAL CODE
2019 CALIFORNIA ELECTRICAL CODE
2019 CALIFORNIA ENERGY CODE
2019 CALIFORNIA FIRE CODE
2019 CALIFORNIA CALGREEN CODE
2019 CALIFORNIA RESIDENTIAL CODE
2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
PORTOLA VALLEY MUNICIPAL CODES AND ALL OTHER APPLICABLE STATE AND LOCAL ORDINANCES AND REGULATIONS.
APPLICABLE CODES
Fire Protection and Safety
• The site is located in a moderate-high fire hazard severity zone per CalFire FRAP map of San Mateo County Draft Fire Hazard Severity Zones in LRA, dated October 4, 2007. The buidlings as proposed will comply with Wildland Urban Interface (WUI) materials and construction methods for exterior wildfire exposure as required per CBC 701A.3, CRC R337.1.3
• All buildings to be equipped with an automatic sprinkler system • Defensible space: ground area within 0-5’ of the building should be noncombustible. A 4” vertical noncombustible separation zone on the building should be maintained between the siding and the ground plane (or other built horizontal surfaces). Defensible space, where grasses are kept mowed, dead plant material is removed, and space is kept between shrubs, larger trees, and other combustible materials, should be maintained within 100’ of the building. Further out (up to 300’), shaded fuel breaks can be used to reduce the fuel load in the surrounding area.
Sustainability
• Electric vehicle charging infrastructure to facilitate future installation and use of electric vehicle chargers to be provided at all units per CA Green Building Standards 4.106.4 • All homes to have photovoltaic panels installed per CA Title 24, Part 6, Sections 110.10 and 150.1 • Additional sustainability measures (not required by code):
a. All electric homes w/ electric heat pump heating and cooling b. Energy Star rated metal roofing (compliant with Town of Portola Valley's Design Guidelines for color and reflectivity)
c. High performance windows - U-factor <0.30, SHGC <0.30, VT >0.60 Accessibility
• All ground-floor below market rate units to be adaptable and located on an accessible route per CBC Ch. 11A • Accessible parking to be provided for at least 2% of the covered (adaptable) multifamily dwelling units per CBC Ch. 11A
• (2) accessible guest parking spaces provided on site.
FIRE, SUSTAINABILITY, AND ACCESSIBILITY RELATED CODE SUMMARY No. Description Date
PLANNING REV. 3 11/10/20
BUILDING HEIGHT AND AREA BY LOT
--
I SIEGEL & STRAIN Arch itec ts I
---
Lot # Unit Type Unit/ Building Area
Height Limit in feet (per PV municipal Building Height in feet (per PV ~OARc code 18.48.010) municipal code 18.54.020) ,~'o,:,.cY MA(o& /~ CJ ""'"' '}<" () ::J C 25636 :...\
'L f':n. 17
1 3 Bedroom 2,236 sf 28 28 , . 1) . 2 3 Bedroom 2,236 sf 28 27.5 ~ ~ 3 4 Bedroom 2,348 sf 28 27.3 ~A ~~ 4 3 Bedroom 2,236 sf 28 28 to xa 5 3 Bedroom, Duet 2,336 sf 28 28 OF CA\.\
6 3 Bedroom, Duet 2,336 sf 28 28
7 4 Bedroom 2,348 sf 28 27.5
8 3 Bedroom 2,236 sf 28 28
9 3 Bedroom, Duet 2,336 sf 28 28
10 3 Bedroom, Duet 2,336 sf 28 27.5
11 3 Bedroom 2,236 sf 28 28
12 3 Bedroom 2,236 sf 28 29.8
13 4 Bedroom 2,348 sf 28 27
14 4 Bedroom 2,348 sf 28 27.5
15 3 Bedroom 2,236 sf 28 27.5
16 3 Bedroom 2,236 sf 28 27.5
17 3 Bedroom 2,236 sf 28 27
18 4 Bedroom 2,348 sf 28 27
19 3 Bedroom 2,235 sf 28 29.3
20 3 Bedroom 2,236 sf 28 29.4
21 4 Bedroom 2,348 sf 28 27.5
22 3 Bedroom, Duet 2,336 sf 28 29
23 3 Bedroom, Duet 2,336 sf 28 28
24 3 Bedroom 2,236 sf 28 29.6
25 4 Bedroom 2,348 sf 28 30.7
26 3 Bedroom 2,236 sf 28 27
27 4 Bedroom 2,348 sf 28 27
BMRA 3,941 sf 28 32.6
Garages & common areas 1,042 sf
A.1 Studio 549sf
A.2 Studio 549sf
A.3 1 Bedroom 703sf
A.4 2 Bedroom 1,098 sf
BMRB 3,941 sf 28 33.5
Garages & common areas 1,042 sf
8.1 Studio 549sf
8.2 Studio 549sf
8.3 1 Bedroom 703sf
8.4 2 Bedroom 1,098 sf
BMRC 3,941 sf 28 32.5
Garages & common areas 1,042 sf
C.1 Studio 549sf
C.2 Studio 549sf
C.3 1 Bedroom 703sf
C.4 2 Bedroom 1,098 sf
TOTAL NEW BUILDING AR EA: 73,691 sf
SHEET 1 of 5 SHEET 2 of 5 SHEET 3 of 5
SHEET 4 of 5 SHEET 5 of 5
GREENPOINT RATED CHECKLIST SUMMARY - SINGLE FAMILY HOMES COMMUNITY 7 POINTS
ENERGY 51 POINTS
IAQ/HEALTH 27.5 POINTS
RESOURCES 43.5 POINTS
WATER 26 POINTS
TOTAL 155 POINTS (75 REQUIRED PER PV GREEN BUILDING ORDINANCE) 10-31-21
Project ID:
Plot Date:
Drawn by:
Checked by:
Project Title:
Design Firm:
Consultant:
Stamp:
Issue Note:
Sheet No.:
Sheet Title:
File Name:
Scale:
6201 Doyle Street, Suite B
Emeryville, CA 94608
TEL 510 / 547-8092
FAX 510 / 547-2604
[email protected]
12" = 1'-0"
11/10/2020 9:14:27 A
M
G1.02
GREEN BUILDING
ORDINANCE
DOCUMENTATION
17-034 SPVH PORTOLA TERRACE
STANFORD UNIVERSITY
11/10/20
LL
LS
SFH_CENTRAL
ASCC
SUBMITTAL
11/10/20 Alpine Road, Portola Valley, CA 94028
APN#: 077281020
12" = 1'-0" 1
GREENPOINT RATED CHECLIST - SINGLE FAMILY
HOMES
No. Description Date
,a.
G!unl'olnlRATID
,,,. __ , __ ,_, ____ ... ...,,,-...... ~-.... -·-··--
-·•--
,,,..,;, ___ ,.,.,_,,, .......... -..-,,,_ __ ._,...,,, .... .. ~ ._"°',.._t.. ... __ "°~~---:eo-....12i•""'ff l>S), lndo<, ... ~JSl,-"""(O, .... W,1o<IO)c"""-.,_ ,,_c,,c.,_, _ _ E,.2 , ... 1, J5.1,01,07 """"'°"''°'"""'Cou""'a1&,_ ..... _..,_• .. -Y••. -..o•,«"TBO'o,a,..,..., __ ., __ .,,_,_ _ _,,,pn ... .._.,,. ,,,. .. ,_ ... ... __ -, ______ ... -~.,_ ...........
. __ ""_., _______ _ , .. _.,.,, __ .... ,
__ ,..___...,,,_.
-·-.. -··-- "'--
f--~-~-~A1 . Con•lructionFootprln! 1 ... ___ ,__,,.._~..,-""_ f-----~Al. .lob Site Construe11<1n Wasle 01""'"""'
A1..1 75¾ CAD Wao,_ o,..,_, {ln<lud;,g Aloma1Jve Daly Cov0<i A1. 2 65'1'. C&D Wa,11 OIYorlio,\ (Eooludlng Abmallve Dolly eo.«J • - A2.3 lleq,:ling Rateo ~""' ll'lf#orty Ve,ffied Ml,..,.u .. w ..... Facili!)' t--~*~--;A3. Rocydad Conlllnl Base Matotrial ---<-<l f--~*~--;M • Koat i.1ond EHe<:I Reduction (Non-Roof) f---•-• --~AS- Con11ructl0n Environmental 01,ol lly Man.1111m1nt Plan Including Fl111~-0ut t-----~A6. Stam,watlr Control: Prucriptive Path
A8.1 Pem,oable Pav.,g M•-
Mi.2 Filtrtitlon ..- 8k>-Re!O<J- Faotu,01
All .3 Non-leodq Rocfinv MIiMi • SmM s,....._w Sir- Design A.7 . Storrnwate, Control: Perfonnance Path a:-,..T,,. ... • """"'"'--.-1 f---~----181. Fly A.h and/a<Slag In Coneni!a ,,._.,_,
t110 82. Radon-Roslslan! Construction 1-------j
>-------;Bl. Foundation Dratnag• Sy•lffll
>---•-• __ J B4. Molature Controlled Crowl•IN'<e
f-----~85. S!JUC\ural P .. t Conlrola
'"' 85.1 hnTiilo _,_ srwl S_,,led E>i"""' Wood-10~ C°""-.S 85 2 Pianl Tr\JOU, a.. .. ,. or Siem> al Lent 36 lntho• (rom lho Foundotior> f--C•c-~---1•-"'"'°""""'"°_"°""'" __ ...... _atl .. _rlumt .... t---•-• __ 7 c1. Plants Gr<>uped by Water Needs (Hydro>:onlngl f---•-• --~C2. Th'" Inc,,.. of Mulch In Planting 81d1
f------Cl. Reo.ou,c,, Efflclirnt Land1c>o1N'I
C3 .1 No lnva"""' Specie, Li>led by Cal-lPC
-,. C3.2 PlanlS C1"'""" arwl LocalO<I 10 Grow to Nalural Size ~- CJ.J Drought T<>!enlnL Coli!omio - • ~•n Spe,;,n, or Olhor Appropri.. SpKie■
C4. Minimal Turfln Landscape f-----~ C4. 1 No Turl on SlopM ExCM!d;ng 10% orwl No 0,,0fflo.><I S.,,.-,. 1n.-., v.. Areas Le .. Than Eighl Feet Wldo >ID C4.2 Turl on• Smlll Perce,,,_ ol Lonaoa,:,ecl ....-e., f---~----IC5. Trea, to Modenito Building Templnolu,. , .. _ _,,.,. ,...,, _ _,,,_,..,.._ t---•-• __ 7cti. Hlgh --Efficlency lnl9a~on Syatom
f-------1C7. One 1,rch ofCompoot In Iha Top Six to Twelve Inc,,.. of Soll ,_.., ,_ , ,_ __ -__ _,ca. Ralnwate, Ha,vutlng Sy1tem
f--~*~---IC9. Recycled Wastewater lrriy~<>n System
t---=---;C10. Submeter or o.dicated Me!ar for Landscape Irrigation >---·-·-"-•-~Cl I. t.and1c•pe MHI• W•t•r 8ud9•I
C12. En•lr<>nmentally Pre!e,.ble Materlala for Site
C lull~" G'""
--•-'-"''> Ver,b,1.0
,_ _____ K5. Fonnaldohy<M Eminlon, In Interior Finish ExcHd CARB 1\51 DooCi
115_; Cabin"" and eo,m,.,._
K5.3 lnle;ior Trrn and ShoM'lg
f---~----IK6. Product• Tha! Comp~ Wrtlr the Hea!lh Product Declirratlon OJJen Slilnda,d f----C..---IK7. Indoor Air Formaldehyde hv•I Leoa Than 27 Parts Per Bill Ion "" Kl. Comprehenalv, lncluslon ol Low Emitting Flnlahes ,_ __ = ___ 7 L I. Em,lr<>nmentally Prefe,able Floo'1ng f--~- ~---IL2. low•Eml!tlng Flooring M- CDPH 2(110 Stondard Mrtthod - R .. ldontlal t---*---;Ll. Ou<1ble Floortng IA'-..,,.,_...,.,.,
- L,. Th•rma l Mau Flooring
f----~-~Ml.ENERGYSTAR®OlahwHher
t-----~M2. Efficlant Laundry App!l1ncH
CEET.-3 M;?.1 CEE-R.at"° Clolhes WaM22 EoergyS!a'Deyer - "'2.3 Sola, 0,,,.,1 L.aurwl'JI LlnH
,__.,_, _____ ~Ml. Size-Efficient ENERGY STAR Relr!ge,ator f----,,---~M-4. Permanent Centers for Waste Reducllon Strategies "° 1M 1 B<Hl•ln Re<:'fCllog C&nllr
"" IM.2B<14i•ln~Cerlltr
,_ _____ MS. Ll!jh~ng Efficiency
M5 1 Hi91>-El!icacy lightang
- M5 2 Lighting Splom OuigM<I lo !ESNA Foolclrdo S-ar Doo'9M<l by L',ihU"II C<>n.r.iftanl
M6. E.Ctr!c Vehicle Charging Stations and lnl!'as1ructurt1 f----,,---~Nl. Smart Developmant
Mn Nl 1 lnfillSne
*
*
N1 2 Deslgno1"d llnlwnfiokl Silo
NI.J Conserve Resow= by txreasing Oen5ily
NI ( Cluol1< - lo< la<><I -•tion
Nl 5 Home Size EflicionO)'
£rt!er lho ....., aO the h<>me. In oq,;o,o llet
En""th• .....-o1-- ~ ----~N2. Home(1~0evalopm,nt LocalS<I Near lran1!\ N2.1 Wrthln 1 Mio o1 o Mo)<w Tu1noa 51011
N 2.2. Wrthln 112mio ofo l.lajorT,,,nsi Slop
NJ. Ptdutrlen and Bicycle AccHs
N3.1 p.,jHNf'l-k> Strv4cu W"hln 1'2 Mill ol Ccrnnu,11y Servku Enw lho .-..mber ol Tler 1 MIMC8S
Ente, !ho .-.-cl Tio, 2 ..,,..,..
NJ.2 c- 1o POtlostnart Pa-)11
Nl.3 Traffic c-,g StrotoglOS
,_ _____ N•. Outdoo, Gathering Places
- N-t 1 Public or Seml.f'\JbtiO au- Gattiering P!eceo lof R-IS N-t.2 Publlc ~ Ga!henog l'l oes v.ith Plrtlcl Acee•• to Tio< 1 Community ~ .... NS. Social Interaction
t--~,-.--, NS.1 Resld_., £rt0rieo v,,tt, 111eM lo Cane"' NS.2 Entraocu Vili>IO ~om Sna1 and/or Olflar Front Doarl N5.l l'ort:hos 0rw>lad "'StrNI arid Public SflllC1I
t-----~N6. Panlve Solar Design
-- N6.1 Heaung load
N6 2 Cooling L<>ed
t-----~N7. Adap!able Building
N7 1 Unl'le,,;ai Desig,'I Pnn~O, Units
N1 .2 Full-Fun.,- hlopo""°nt R&ntel Unit
f--~~-~N8. Realllency
nlO NII 1 Vuln0<8l>iityAs5e$smo,ntiu-,,,,s..--.HA<"°',_""",.-.,.-, mo Nll.2 Stra<egies 10 Add,ess -...,.,n, F"""""""'
Cl lullO n Grttn G<ff«Polo1 •at«I - IIOm< Si"'t!le f ........ Ch«•lko - 1.0 '55
Plotln,m
POINTS REQUIRED
•. ,
I
·--·--
___ ,_.,, v..._1.0
>----~ Gl. lnatall Wot.,-Efflc!ent Fl•turu
·- G2.1 Waters.""" --1 Bg,)m v,iltr Me~ Corr,penl&lion Volve G2.2Wste,S.""' Satlm>om Fauceb 1.0 gpm
.,.,.,.,, G2.3 WalerSeJ'SII Tolloto ~lh • M.wmum -nee (MaP) Tin•hok! o! No Le .. Thao 500 Go-om, ! 28gp! Oil I 1 111>1
f---~----<03. Pre-l'lumbl119 lo, Graywoter Syot•m
f---~----<G4. Operational Graywater System
T110 G6. TJ>ermostallc Sl>ower Val"" or ""-'to-Olv•rslon Tub Spout Hl. S.aled Comti..,tion UnH, >----~ Hl 1 Sealod Comwstioo Furnace ·- Hl 2 Sealod eo.,_, WalerHoalor
t---*--~H2. High Performing Zoned Hydronlc Radl•nt HHllng Syatffll f-----~H3. Effectl"" D1rc!worl,
Hl.1 0.CIMaSliconDuCI.IOo"lt$an,:1Se/>mo
1-<3.2 Prl••"'" s,,.....,. u,o 0-11 SY"lem
f------~H,. ENERGY STAReBottuoom Fana P•r HVI Standarde w1ttr Air Flow V•rtn•d f------H5. Advanced Practices fo, Coolln9
H5.1 ENERGY STAR Celling Fans 0, I..Mng Antal and Bodrn<>mo f-----~H6. Whol• Houu MKhanfc:al Ventllatlon PractlCH to lmp,oy• lndoorNrQu1llty ·- Htl.1 Meo\ASHRAE 62.2-2010 VentiaUon R_,tiol Sla<lr>ardS Htl.2 A<!,anced Veritilalion Slandartlo
- HII.J o.ndoor ,., is Atered and T-red
f-----~H7. Etr.ctlve R1n111 Hood Dealgn and lnstall,uion H7 1 Efleolivo Ra,tgo HOO<I Due.iv and Dooign
tt1 .2 AIJk>mallc ~ Hooct ConlrOI
110 H8. High Efficiency HVAC Filter (MERV 13+)
f---~----<H9 -•need R,tngeran1a
f--~•c•~-_,H10. No Fire place or S.aled Gas Firep lace
f---~----<H11. Humidity Control Systems
nlO H12. R~l1tar Dulgn Pe, ACCA Manual T
f--~-~---111. Prt1.f'l1rmbing for Sola, Wa!ar Heating
f---~---;12 . Pr,p,rration !or Future Photovoltaic lnolallation f---•-•----~13 . On•H• Renewable Gene,atlon I Solar PV. Solar Thumal. and Wlf>d) f-----~M. Net Zor<> En-.iy Home
14 1 Nea, Zero Ene<JI}' clome
14.2 ~• Zero EIOctnc
15. Ene,gy Sto•- Syatem
f--~•c•~--Jl. Third-Party Vertfkatlon of Quality of lns1rlaHon lns1allation f---•-• ___ J2. Supply end Ratum Afr Flow THtlng
f---•-• ___ Jl. MKhanlcal Ven~lollon TH~ng
f---*--~J,. Combustion Applianc,i Safety Testing
,__ _____ J5. Building Enervy Performance
' ·"'"" J5 1 Home M-o, ElcCff<lo ~y Compqnce P•tnway
f---•-• ___ J6. Tille 24 Preparwd and Sig""d by• CAB EC Certified ErMl,gy Arraly•t f--~=c_ __ J7. Participation in utility Program with Thinl~arty Plan Re.,;,,w TM J8. ENERGY STAR fa<Homoo
>----~
f---*--~Jll. EPA lndoo, alrPlus C,r1lflc11lon
,.,..-,_..,. JlO. Blo-..erDoorTesling
t-----~Kl. Entryways DHlgnS<I !c Reduce TrackS<l-ln Con1amlnan11 •• K11 ~,Jdy>IEl'llr)w;l)11c-..,_""'_ •_.., __ ., __
- K2. Zero•VOC ln!erl<>rWall and Celling Palnlll
'loo KJ. L-•VOC Caulb and AdhffNe1
f-----~K4. En~lronmentally Prolorabll Materl1l1 lot lnte'1or Finish C lulld " G'""
K-< 1 C.,~lnots
K-<.2 lnlerior Trrn
K.<.3 Shelving
K-<, Doo"'
l«.5 Coonle""PS
--•-•-"''' v.,....,1.0
N9. Social EqYity In Community
- N9.1 Di'lo,..,w<:rt1orco1_,_..,.,._..._
* Nll.2 Communlly ll>Cllk>n 1-""'-'
·- Dl . GteenPolnl Rated Checklist in Blue prints
·- Dl. Pre-Conolructlon Kickoff Mltr~ng w~h Rate, and Subcontractora - DJ. o.t.n!atlon ,rn1 TNllnlng lo Oecuponta-Conduc! Educ,,llonal Wollrlh<OYghl ·- 04. Build•~• or O.V•lop•~• Man~omont Slilff are C,utifl,od Green Buildlng Pmlessionalo
0$. HOtrMI Sy$tam llonl\ora
- ~ I Ene<gy -Syotem Monllora
- 00.2 Wo10,-System06. G,~,rn Building EdYcation
- 06 1 MOr"-"ling Gr9a> BYildinv
- 06.2 Grel,n Building S',ln&ga
- 07. Gn,en Appraisal Addendum
- 06. Detailed Durability Plan and Thl,d-Party Vetlflcatlon ol Plan lmplem&ntatlon Total ~•- p,;ms 0, - c_ ..
Minimum Points Requlrwd In Specific Cotegorlu
"
•
•
"''-' "
•
"
•·
• • • .. .. •. , .. •. , •• .. " •. , .,
.. .. • • • •
,._, • " •
"
___ ,_.~ 'tt<1io<>7.0
.. C12 , En,,-laly Prof..,.,.. Molerlalt lor 70'> or Nor>-P!ertl l..-.1~ E_.,.o,nd Fencing
f---•-• __
7 C1J. Reduced Light Pollution _, _____ _
c1,. LargQ Stature Tte<r(1)
f---'-C..---IC15. Th!rd Porty L•nd,cope Program Cortificatlon •• c1e. Maintenance Contract wlltt Cortm...i f>t-ofeulon11 _..__,..,.._, D1 . Optimal Vall>O Englnoerlng
f--~-,--~ 01 1 Jolsto, R-. end Slud -l ., lndlool on Cenler - 01.2 r...-..1.oed ee.nng Doo< ...d WOld<>w _,. s""" f<rt Lood "" 01.J 11<1,ooced Framing """""-<es
f---=-'-~02. Con1tructlon Mater1al Efflclancloa ,_ .,. _ _,,_..., • - - ~ ~...,, t-----~DJ. Englnu<S<l lumb.,
v.. 03 1 Eng- Beamo MCI -•"'
·-
•
•
•
•
03.2 w<><><1 ...-. or we~ Trus ... fo, Floors
Dl.3 Eog- L"mt>er ro, Root Raf1e<tl
03 4 Eng- or Flngtr..JootlO<I Swds IOr V""""'I AppliCMont
00.5 OSB !or Slrl>_, OJ.6 QSB far Walt and Roaf Sheattilng - CM. ln1ulatS<I HUM!'I t----~
f------05. FSC-C•rtiflad Wood
D5 1 oime.-... L1Jm1>1,r. s __ and Ttmbef
- 05 2 Psnol Pmducls
f-----~D6. Solid Wall Sy11em1
•
*
•
D6 1 AtleoSl90% ct Fl"""'
06.2 Atlea"190% o!ElclerlorW~
06 3 At UOII - of Roolo
,_ __ ,_• __ 7 07. Energy Heel• <>n RoofTruneo
f---"--~-~Dt. Overhangs and Gutters
t-----~D9. Reduced Pollution Entering !he Home from the Ga.age • 0910e~Gtrogo
09 2 Miliga- Sn•ll!II"" far Allaehod GarD10. Structu,al Put and Rot Controls t----, *
*
orn 1 All W0<>:1 Loca\odAI LNSI 12 ----lho Sol
010 ,; WOO<I F ........ Trelled Wilh Borates or FKIO'Jl·""P'l9"8\t<I, or w .. M•-Diner TJ,on WoO<I D11 . Mol1t1rN1-Raols!ant Materials I" Wet Areas (ouch H KHchen . Balhrooma, Utility Rooms. and Basements}
1-------;EI. Envl,onmenl.llly Pral•rable Decking
,_ _____ ...,El. Flashing lnslallaUon Thl,d.f'arty Verif"ied f--~*~---IEJ. Rain Sc'"n Wall Syotem
f---'=•~ _ _,E4. Du,obla and Non-Combuatlble Cl1<1dlng Materlala f-----~E5. Du,obl• Roofing Matatlai.
E5.1 [>u,_ an,:1 F<o Re>i51iont Roofing Mateoroi> o, A>""mbly E&. Vegatotad Roof
>-----~Fl . lnsulollon wl1ll 30% Pos1-Consumar or 50'fo PosHnd1rslflal Rocycle<I Content - t----,
-
Ft.1 Walls and Floot&
Low Emllslon•
F2.1 Walls and Floors
F2,2 Coiing,o
Fl. lnsullllon Tlla! Do .. Not Con la in Flra Ratatdanl• Fl.1 ca,11yw ... ""d F-. F3,2Co~r,go
F3 l ln"'rior ondE,_,
f-----~GI. Efficient Distribution ol DomeoUc ttol Water Gu 1n,ula'8d Hot Wator ~
- G1 2 w ... ,_ Volume Lnoit 1or clol w, ... D<olrlbu\lon G1 .3 In<,_ Effi<>enO)' In HOI wo1e, D-tio,,
..
SIEGEL & STRAIN Architects
OARc
cY MA(o
_, C 25636 <" :..\
SHEET 1 of 5 SHEET 2 of 5 SHEET 3 of 5
SHEET 4 of 5 SHEET 5 of 5
GREENPOINT RATED CHECKLIST SUMMARY - MULTIFAMILY
COMMUNITY 9.5 POINTS
ENERGY 61 POINTS
IAQ/HEALTH 32 POINTS
RESOURCES 43.5 POINTS
WATER 27 POINTS
TOTAL 173 POINTS (75 REQUIRED PER PV GREEN BUILDING ORDINANCE) 10-31-21
Project ID:
Plot Date:
Drawn by:
Checked by:
Project Title:
Design Firm:
Consultant:
Stamp:
Issue Note:
Sheet No.:
Sheet Title:
File Name:
Scale:
6201 Doyle Street, Suite B
Emeryville, CA 94608
TEL 510 / 547-8092
FAX 510 / 547-2604
[email protected]
12" = 1'-0"
11/10/2020 9:14:28 A
M
G1.03
GREEN BUILDING
ORDINANCE
DOCUMENTATION
17-034 SPVH PORTOLA TERRACE
STANFORD UNIVERSITY
11/10/20
LL
LS
SFH_CENTRAL
ASCC
SUBMITTAL
11/10/20 Alpine Road, Portola Valley, CA 94028
APN#: 077281020
12" = 1'-0" 1
GREENPOINT RATED CHECLIST - MULTI-FAMILY
No. Description Date
NEW HOME RATING SYSTEM VERSION 7.0 lineoPolnt:l 1, ------M-U_L_T_IF_AM_IL_Y_C_H_E_C_K_L_IS-T--------< -
"'"---···-·----... -.. , ... __ " ............ ,.__,, .. _,.,._,_,_ ... -~ .. --,,_...,_,_...., .. ,. .. _,_ n._urn ,_..... .. -,._.,.._ .. 50.,,_._, ... ,"" __ m""'_.,._ . ..._IZ! "-vrl2!'1. _ ... __ !ll-lll""''"-ll'""-""--"'""-"'-·""'•"'·'· ... ·'•o•. o, -~ -.. .. u-"""""'•~•------".,.,._.. .. ..,. .... .,.,. ... ,..,. .,,,,_,,, .. __ ., __ _,.,. ... -_, ... __ .. , .. _ ........ -...... ..--.,,. ... . _11,o_.., __ ... _________ ~,""-.., .......... ..., .......... _h, ,_.l,-.... M ... ,_...,.,.,,_ -•G'"•~-•-'"'"'--•· .. ._ ... _,,__,...._. ... -.. . ... ........... c..,J .... G-.. ,~ ... - dbyB .... 00.- -----~ «nloo7
i ~'-"' IT
~
'" ICALCrHn !REQUIRED}
-'" IA1 . CG<Ktrucll<>nFootprint 1 .. ______ oo. __ .._ __ ,__ Al. J<>b Sito, Conotructlon Wn to Dl•.,.lon
'" A2.1 75'11, C&DW••"'°"""'""' lln-ck>d;,,g -,n•U,o~~J • A2.2 65'11.C&DWa,,..oi-.io,, iElo<luding Allotoativo Dai,Cov.>t) '" AU Rio<:ycllngRB1 .. 1,omlhlrn-Por,yV-Mlx-WaOlOF11<1ity ,. A3. Recycled CGntont BIM "'•torlal _ ........ -~,
• M. He at lslano Effect Reduct!<>• (Non-J'loofl
'" A5. Consln.lC1lon En...ironmental Quality Management Plan Including flush-Out A6. S1ormwai.rControl: ..,...,npH•• Poth
• M .1~P,wlng-
= M .2 F-a.o/otB;,..R,,,..,tloh F-.....
,. AS.l -•arnlnlJ ~ M>IMol•
,. M • - s"''"""'""' s- 0e,ig,,
'" A7. Stormwotor Control: PoJforman-co Path _,___ , __ ,......., -- .. '"'-""""""
'" 81. Fly A5h and/or Slag In Con<:"'le - """''
,. 82. Rad<>n-R••lotant Cor,atrueilon
'" B3. F<KJncl.ation Oralnaga Syotom
.. IW. MoiotuA Controlle d Crawlspaco
B5. Sttuelunl PH I Con!rolo
'" I B~.1 T ....... Shilk!< - S-ra,od e.-Wood-i<>-Concra!a Conr>acl- '" I 85.2 Plant TMilYI. s ..... or SLom, al Lust 315 lr>ehH from ho Fou-- ,_
·- ._ ... __ .,. ___ .. , ....... --....
'" C1 . Plonta Grouped by Woto, Noedo (H)'dro,onlng)
'" C2. Thrff lncl>oo of Mulch In Planting s.d1
C3. Resou,u Etllclont L..a<><locapos
'" Cl. 1 No --Spocils UlttlO oy Col-FC
,. Cl,2 "-'11 Chooon """ i.o<eOod I0 0-o, Natural Si:lo .__ ,___ ,. Cl.l Oo:iught TolotML Calbnia NaU.•. Modi!Mranoon Sp,,,:io._ o, Otho,- -l•Soeoo,5
C<. Mini.-1 T..,-f In Lo<>docape
,. C4.1 No T..-t on SIOPH E>cff<l.-.g 10'II, - No°"'"'"" Spv,OJorJ ,_ r, - L ... Th"' Eigl,1 F- Wldl
,. C4.2 TUii on a Smal PotconlOgeol ~ Al"••
- C5. l<H• to Moderate Building Tompenitura "'-"""""'"""'"--""' ,.._ ,. Cti. Hlgh-Efflcloncy ln1gation Syolem
,. C7. Qno lnc:h of Compoot In tho Top ,i.. to TW<Olva lnc:l>oo ol Soll (_.,.,_ ,. C8. Rainwater Hatvosting System
• C9. Recy,:lad Watewater Irrigation System
,. C10. Suhmllto< or Oodicat.d Moto, !or ~•cope trrlgoUon ... , .... C11. lo<>d..:ope Motto Wai.r 8Ud110t
c12. Enwonmentany ..,.,erablo MatO<lal1 tor Sito
,. C1 2.1 _,,,,montalty Pn,fe<aOI< Mat.,.... for 70% of Non-f'lonl La~ Elamonto0!10 Fonc"'!l
,. Cl2 ,2"'-1'S!rucMH_llurf_, _ _,,..,,., ... eR""'!d9dCon->20'II, ,. C1l. Redll'CH Light Pollutlon~--- .----..nl
Ell!
,_ >91>'11 114.l SheMng
114 4 0oo<o
,. K4.5 C<o.nterto1,o
115. f<>rnliltdotiyde Emlnk>nl In lntorior Flnllh E>:cnd CARD ,. KS.I Docn
,. K~.2 ~,.and~•
,. K0.J..-T<imac,;1~
,. Kti. Product• That Comply With the HHttt, Pro~uct O.C:11,-tlon Open Standard ,. K7. lndoao N, Fo,mald•hydo Lo•ol LIi .. Thon 27 Porta Pot BIiiion • KB. Compn,l>onol•• lncluolon of low Emitting Flnlohff ,. K9. Ou,ablo Cabinet• _,_.___....._.,._,,, __________ ,. K10. At ~Nol n%ol lnterio, fumltu,o H11 En•l,....,.,.ntally Pt1i.nible Att~butn c-~
·- LI. En...ironmenta ll y Pmflrable Flooring
·- U. low-Emlnlng Flooring llee!O COPH 2010 Standard llethod - Resldo~!lal • U . Out1ble f loo~ng ..,_ ,.., ,,.._
,. L•. Thermal Moll flootlng
IL~_, UGHl1NG
,. M1. ENERGY STAR® Olt.hwut,o,
M2. Efficient Clothe• WolNng ond Ol'ylng
"''""" 2 "'2.1 CEE-Raoed Clo-W-or
,. M2.l Eno,gy Sta, D<ye<
,. M2 .J So&oro,y.,,I LocnYyl.heo
~-~ Ml. SIEI-Elflclont ENERGY STAR R1f.-.ntor
tM. P,,,.._nt Co ntfft l or WHto Rodudlon Stnitogie•
. I M4 .1 ~ Re~Cenle<
. I PM ,2 _ _.. Com00>'"'11 c.nte,
M5. Lighting Elllcl•ncy
,. M5. 1 H9>-Ellioacy Llyhllng
,. M5.2 ~ S)'<tom ~ to JESNA Foctcaodl0 S-<>< lle$igned by~Con-
~· M6. Eloctrl,: Vohlclo Cha,glng Stotlano - lnlrnttue:t""' • M7. C1nt,-1 Laundty
• MB. Geat!Hs Elo,ator
ILCOMIO""'TY
N1 , Smon O.wlopmonl
• NU lnMSllo
• NI .2 OMq,,,IM e,.....-Silo
• N1 .l eons.vo R'°'°""""' by lnett,aslng Otnoil:y
• 1<1 ,4 ci.-Horr.eoforlono P<eooN1 .5HOmoSi«Eff"""""
I En"""'" a,oo of"'" ""°"'· In ,qua.., 1-1
I Entor.,.oomoo,ol - •
N2. H""""(111D1..,loP"'1nt located NH , Mojo, Tronolt StOJ> • I N2,1w;,r;,,1-o10....,,..t"'n'"SIOP
. I N2.2W..,...112 -ofoMoj(J,Tcan,.Slop
NJ. Podeolrion and Bicycle Aooen
NJ, 1 -,Ion J\O<OU Kl Servlco1 W- 112 ~ o1 Conwnur,lty S ......... ' En, .. ll>o .-.Jmbor ol Tior 1 ..,.,;_
. En!e< lho ,vum~er ol r..,- 2 ....,;oes
,. N3.:.l ~lo~ P•lh,.ays
,. NUT.-CoimlngSnM,gloo
• NH -• l!<JffOfOd from Roadways and 5-8 Foo! Wido
,. N3.5Bi<:yde S!e<"11'11<><-IS
,. NU Bicydo Slot_ !of Non--!!Hloanla
,_,.., .... N3.7-Patki"!iCapoaly
N<. Outd<IOO Gathotlng Places
,. I N4.1 Putoi<: or Soml-P<Jblc Out<loor GaUiering l'!iID3-s ror -• • I N4.2 ..,_ Ou!<loor ~ PIO""' - o...ct l\ocoA ,o ,--_, I Co~ NS. Soclol -ln1eroctlon
,. I N5.1 R~ Entrios will Viow, lo Callon
,. I NS.2 Emnln<:M VI- Imm SU0&t ondl<or OU.,, F,oot Docn 0-ltGrttn
·l I
!, ' •
I
'
'
0 '
0 '
0 '
'
'
'
0 ' I
' I
'
'
'
'
'
'
'
'
'
0 '
'
' '
d ;
i
'
'
'
'
0 '
' I
'
'
'
0 I
0 I
'
'
0 ,
0 '
" ' 0
0 '
0 ' I 0 ' I
0 ' I
' '
' 0 '
'
'
' '
' ' I
0 '
' I
' I
m
~·
,. CU. laf'9'1 Stature Trao-(•)
,. C15. Third Pony Lond..:- Program Conific:otlon
,. c1e. Malnteno~ ContrKI with Cenllio<l Prole11lono1.....,_,.__~•-, " CH. Commt0nlty Garden
POINTS REQUIRED -- io,otRO<:nJIW,. .......... _...........__ 01 . Dpllnuil Value Engl.-ring
,. 0 1.1 .-. Ra!loto, ond s-ot 24 1-once"I"'
,. D1 .2 Non-I._,.,, ae,,ring Doo< ""d W1-,.._,.. s;,..i for 1.00d • D1.3-Fra"""" .... ''"'"•
,. 02. Conottuetlon Motorial Effiel1ncl11 _.,. _ _ _ ., ___ ~_, ! !
' ! ' ~ ' '
03. Engl.-rod Lumber
,. D3.1 ~ Bo,,.,....., Hoo<lora
,_ Dl.;l Wood h.io<olo"' Web Trus,., fat -
... -- _,
• Dl,J e~ Lu_,.,. - RB,..,.
• D3.• e~ or Fingar........., ScL>dl Jorv.....,., Ao~
, I , I ' I ' • D3.5 OSB for Subfloot"
" D3.6 OSB r.,.wao oc,;I FloolShe<attiin!l
' ' ' ,. 0.. lnoul.otod HHd0to
D5. F$C-Gertl!l<id Wood
' - I D6.1 Oimensionol Lumber, SIU<lo, and T-
' ·- I D5.:.l P- Pn>doot>
' oe. Solid Wall Syotom•
' • 06.1 At LHlf illl¾ or Flaonl
' • 00.2 At lHlf 90% of E.<Lorior waa1,
' • 00.:l At lHlf 90% of Rooo
,. 07. E"''IIY Hoo!o on RoofT<U0ffl
' ,._ In. Ova<hang1 • nd Gun.to
' 09. Reduc:od PolMlon Enl•ring tho Home from tl>o Ga,a,go ' . I 09.1 llola<:nod Garage
'" I 09.2 ~ Slrallgiol lot Alla<:i>ocl ~
' 010. St""'t"'"I Peot ano Rot Control•
" D10. 1 Al W<>O<t Located At LaaOl 12 """"'""°"" LM Sal ' • D10.2 w- Framing Truting W<th ElotalH ot Foctory-~<a!, ot Wol ....,_ 01ner n..,, Wood '
' ,. D11 . Molllure-1'111111,nt Mot,n,11 In Wot ArlH 11uc:h H Kitchin, 8-00ml. Utility Room,, a<>d BHemlnl•f
' ·~ ,. E1 . En.;,o.......,lally PrelOt11b!e Decking
I I ' I ,. E2. FIHhlng lnotallatlon Tl,lrd-Pany V...tflod I I ' I • EJ. Rain 5UNn Wol l Syslom
,_ E4. Durablo and Hon-G<>mbustiblo Cladding Matorials
E5. Dutob!e Roofln9 Matffial•
' ' ' ,. E5. t ~ and Fin, RftisLon! Rocfir,g Ma- at A~
' ' ' "" E5.2 Roollr,g Warranty Jor Shinglo Rcdftg
• E6. Vegetated Roof
' -,..,._.no~
' F1 . lnoulatlon w~h JO% Po11-Con1u,,.... or IIO'llo Poot-uotn11 Recycled Con1en1 ' ,. I FUW--F"""'
,. I F1.2 Coir,gs
F2. lnoulatlon that Mfftl 11 .. COPH Stono,,d Me thod-R11lde ntle l loo Low Emlllk>nl ' ,. I F2.1W ... -,Floora
' ,. I F2.2~
' ' ' F3. lnsulatkln That Does Not CoJ\lain FR Retardants ' ,. F),1~W1t1tonoflootl
' ,. F3.2~
' ,. FM l,-ond E,terio< ._lion
' .. ' 01. Efficient Dl1Mbutlo,, of Dom•ltlC Hot Wotor
' ,. G1 .1lnaulalod HolW-l'ipes
,. G1 .2 WallltSenoe Vol\me Llmil fo, HOI w- DiSllibucion ' ,. G1 .3 - Efficiency_, Ho< Wo1e, Di>trwtion
' G2 , lnotall Water-Elli<lont Fb<tuto•
,. 02.1 w.....s.n .. - \ .!!!!>ffl- Matching ~Ion vi ' r , i I
' ~ rao NS,3Pon:IIH~toS!l'Nlon~Put,ll,:Spoco
' N6. PoHIYe Sol• r 0.oign
' - N\1.1 HeainJ Load
,. "6,2 Cooing \.Olod
' N7. Adaptablo Building
' • I Nl.1 u.w...t Do~n - In Lin~•
' - N7.2 l'ul-F'-"""'lon ~!Rental._..,
' Na. RH llloncy
' ,. I N!.1 -OllilyAsNIOmanl i .. _ ,__,_........_ _ _ ~-•- ' ,. I N~ .2 Sn10g!HtoA<lo"'""Asoo .. rr.en1Frndings
' N9. Social Equity
,. "111.1 0-WorO.!orce , __ ,~'--'
' • I 1-19,2 C<>rMU1ilyLoco"""-~
' N10. Allordablll\y
' ·= N10.1 Oedicat<t<f Units fo, Hooseholds Making 80% or AMI"' Loss ,. ' N1 0,2 IJnlo ,oilh Mulliplo Bo<troom ■ r.,. -~· Making IIO'II, o1 AMI or l ... • N1 0.3 At lOOOI 20% ol Units at 1 lO'II, AMI or loH o,o fo, Sao ' N11 . Ml,ed-tlse Otvelop,nonts
I I I ' • N11. 1 l.MIIW""' Units lnclido o Otd-Commercial Eotr.tnce • N1 1.1 At looot 211 or 0tve1opmon1 Floor Space Su-• - UM ' ' • N, I .J .... "' "'" Non-R_, FIO<Jt Spoco lo Ooctlcole<I O> Com""nlt)- - .. ' -,. D1 . G'"nPolnt Rated Cl>o<kll•I In Bluoprinto
' ,. 02. Pro-CG<Ktructlon Kickoff Mooting with Rote, tnd S..bcontroctoro ,. Ol. Qri•ntatlon ond Ttolnlng to Oecupanto.-Conduc:I Educational Walkth,ough• I I ' I ,_ 04. Buil<II<'• or O.velope<'• Managomont Staff a ro C.nilled Groan Building ProfeHi<Klols
I I ' I OS. Home Sr,,tem Monitors
,. 05.1 E""'l!Y - Sys'"'" MO<ll\ot■
' - I 05.2. W-Hooie Sy,oem_,
' 06. Grun Building Education
' ,. Ol!.1 ~ G"'on B..:lin!l
' ,. oe .2 GtNn Building~
' ,. 07. GrMn Apj>raloa l Ad<IIMum
,. oa. Dotallod Ourob ll lty Plan and Third.Patty Vorlflcatlon of Plan lmplomontation ,. Q~, Ruld•nto Aro Olforad F'" o, Dlocounted Tron•~ Po11n ' ,. 010, Vandallom Oelatronce Pt1ctlca1 o<>d Vandollom Management Pion ' ,. 011. Smokeftee Bulld!ngs
' ' ,. 012. ln109ratod PHI Manogamont Pla,t
"
'
·---P1 . Acouotlco: Nolff •no Vibration Contn>I
' I Ente< lho number a, T.,,- 1 ,.,adlc,o
' I Ento<"'" ...,mbor ol - 2 p,a<tl<ff
P2. "'1 .. .:1-u .. 011lgn Slrltogl11
I I I • P2.1 Tonont Im- Reo,.,l,ernonlS for Buo<\-0,.,!> I I I - P2.2 ~•• Loading Area $ep,rot,,,;t for Resldenllot Are• " P2.J Se- Moo>,anit.al """ PlumOing Syotam,
I I I Pl. Comml11lonlng
,. Pl.10toig,,Ptio ..
,. Pl.2 eor-..truct1on Phose
,. Pl.J Po.1-0,n,.tr..olion -
,. P4. Bulldl1>9 Encloouro T-tlng
,.,....,.;,__.,s_c.p; .. Minimum Pointe R""Ult1d In S Hlo CMogorll1 . .. I I I
I I
I I I
I I I
0-ltGr«n
1! I l I l !
'
'
' ' 0
'
' ' •
' ' 0
'
'
' '
' ' 0
' 0
' 0 ,., 0 ,.,
' '
' I I I , I
' I I I , I
0 ' 0
' ' , ' '
' '
' ' '
0 I I ' I I
' I I ' I I
0 ' 0 '
' ' '
' '
' 0
'
' '
' '
' • . • • . 0
' ,
I I I , I
I I I , I
' I I ' I I
' I I ' I I
' '
' '
' '
' '
' '
'
' I I I I '
ii
;
i ' j r •
,, i !
'
' ' ' ' ' ' 0 ' I I ' I I
0 ' ' '
' I I , I , I
' I I , I , I
' ' ' ' 0 ' I I ' I I
' '
' ' 0 '
0 ' 0 ' 0 '
' • • • • •
' .. ' ,.,
" " .. ,.,
' .. " ,., "
I , I I I
I I I I '
'
" ,.,
' • • • • •
'
'
'
'
'
' ' I I ' I I
0 ' ' 0 ' 0
'
' ' '
' ' '
' ' '
' ' '
•
"' • "' • • " • ' " • • "iJ: " •
[!
,. G2.2 Wale<l,f:o.., Satt-o-oom Faucets -..ith 1.0gpm or loss ....... G2 .3 WOlorSoose T-wilh o .... ......,, - o=once (Uof') T~ ... - ol No LOHT- 500 Otomo 1 231!pf Off \ 1 9P'
• G.Ullnnllltwllhl'\uonRateo!S0,1 ~lu"'1
,. G3. Pre-Plumbing !or Gnywate, Syotem
,. G4. Opontional G<aywatet Syotom
,. GS. n,.,....,.11110 S-r v , 1., o, Aulo-Ol•ttolon Tub Spout - 06. Submlt• r Wat•r loo hn1nt1
-TING. -.,.not<, - - .,.,..,..,.,_
H1 . Staled Combustion Un~•
,. H1 1 s..iea eo,n,,.,._ Fun>tc0
,. HUs..iea CombuS!i<J,,W•10, Heator
• H2. High Porlorming Zoned Hydroni< Radiant HHting System HJ. Effo<lin Ductwort
,. Hl.1 0.... Mooollo o,, 0.... JoinlO ano S.-
- Hl.2 PR>nure Balonoo ho °""""°"' Syo1em
,. H4. ENERGY ST AR® Bathroom Fans Per KV! Standards wllh Ai, Flow Votifie d H5. A<IYaneed Practice. for Coolin9
,. I H5.1 EM,RGY STAR c.llng Faoo In LM,,g Aruo 0!10 Boditom■ ,_ H5.2 ~ w.-. and S~)'llgt'Mo 1.ocolod !o l<><luoe C.,u VOn!Mla>n n At LA,., Ono Room ., 80% of Unib
Hfi. Wholo HouH Mochanlcal Vontllall<>n Pr11ctlcH 10 lmprova l<>doot Air Quallty ,. 115.1 - ASHRAE SIOndaro 62 2-2010 Ventilalion -•I Sia- ,. HS.2 ...._,COO v.-Standord-1
,. H6.30u""'°'Al,I• ,,_ ond THT. Elloctlva Range DHlgn and lnstaltallon ,. HT. I 81oc&,o ~ - Ducting - PHlltn
,. H7,2 -tic Rongo - Cot,\tol
,. H8. High Efficiency 1-f\/AC fi~e, l"'ERV 1 l •)
,. H9. Advanco<I Relrigennts i... ___ ,,._,
...,.,,._,,....,, ,. 11 . P,o-Plurnbi"li for Solar Wator HUiing ,. 12. Propar11tion for Future Phclovoltalc Installation ""·- 13. Dnoilo Renawablo Generation !Solar PV, Sola. n ... mol, and Winoj
14. Nat Zl<O Enor91 Homo
,. w.1 -Zon>Er,e,gyttomo""'"" _ _ .,...,..., _ _
'" W,2 Nol~E- _,.,...,....,.,......,_ ., ___ ,
- !~. Enerv-, Storage Sr,,tem
,. Ml. Sol., Hot Wotor Systoml to Prel>oat Dom••tlc Hot Wotor ,. 17 . Photo ,ol1alc System for Mu ltWamW1 Proje ct•
• ...._.. .. P£AfOAJooHCI'..., fUTI"°
,. J1. Third..Pa ny Vo,if"oc:ation of Quality of lnoulation ~•tallation ,. J2. Suppfy 1nd Rotum illr Flow TH11ng
,_ Jl. "'ochanlcol Ven~la!lon Tooting
• J4. Ctwnb\ll<tlon Appliance Safety T""Ung
J5. Bulld!1>9 E"''IIY PerlOffllance
·- J5,1 HOmo Mooollor ~ Ent<WComplio•co P"""""'
·- J5.2 Non--!lolllOontiot 5- Outpetform T.,. 24 ,. J6. T~le 24 Pre pared - Sl11nod by a CAB EC Cenffied EM,gy Analyst ,. J7. Poni<lpotlon In Utility Program with Thl,d•Pa<ty Plan Re •low ,. J8. ENERGY STAR lotttom11
• J9. EPA Indoor alrPluo Cert~lcatlon
,.......,,.. ... J10. Blower DoorT..,.tiny
,. J11 . Comi>onlmontallutlo,,o!Unlt1 ___ ,.,_ ____ ,
K.PONIIIIU
K1. Entryway, Doolgned to Reduce T,ac:ked-ln Contaminant• ,. K1 .1 EnhywO)OIO,,-..,IIJnlo c---~-.,,--,..--
,. K1 .2ent,ywa,01o~ ,...,..---•-----·---""~ .. ,
,. K2. Z.ro-VC>C Int•~<>< Wall and Colling Paint•
,. KJ. Low-VOC Caulk• a<>d Ad heolw•
K4. En,,;,onmo ntally Prefo,a bl• Matffiol• for lnteoi<>r finioti ·- I K• 1 c..i.,,
·- I 114.2_,T"m
1! I l
'
'
0 '
'
• '
'
'
I ' I
' , I
' " "
'
'
'
'
• "
' 0 .
'
.
•
'
' '
'
0 " ~
' "
' '
'
'
'
' '
'
'
'
'
' I I
' I I
I l
'
'
'
'
I I
I
• "
'
'
'
'
'
'
'
'
'
'
'
'
'
'
'
'
'
I ' I
I ' I
!
'
'
'
'
'
'
,
•
SIEGEL & STRAIN Arch itec ts
OARc
cY MA(o
_, C 25636 <" :...\
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-1.0 COVER SHEET N.T.S. LEGEND SA 111'.X/T AND CONFORM UN£ RETAINING WALL A.C. PAVEi/ENT CONC. VALLEY GUTTER CONC. SIDEWALK OR PAD 6" CURB .t GUTTER 6" VERTICAL CURB CENTER UN£ SANITARY SE'IER MAIN STORM DRAIN MAIN PERFORATED PIPE WATER MAIN RR£ WATER MAIN DOMESTIC WATER MAIN /RR/GA 1/0N UN£ FLOW UN£ CHAIN UNK FENCE GAS MAIN ELECTRIC AND SIGNAL DUCT BANK CONTOUR ELEVA 1/0N UN£ SPOT ELEVA 1/0N DIRECTION OF SI.OPE WATER METER WATER VALi£ RR£ HYDRANT BACK FLOW PREl£NTOR POST IND/CA TOR VAL 1£ '!J/ljJ DEPARTMENT CONNECTION WATER UN£ TEE CAP AND PLUG END SANITARY Sl'HE11 MANHOLE SANITARY Sl'HE11 CLEANOUT STORM DRAIN MANHOLE STORM DRAIN AREA DRAIN STORM DRAIN CA TC/I BASIN STORM DRAIN CLEANOUT ELECTROLJER JOINT POLE EXISTING 8" --ss- 12" -~-so--- -~6'_' -w--- 6" FW -------nw--- IRR--- --X--X- ---G--- ---E--- ---85--- x 95.94 % w,, [X] d M -tOt- PIV 0 0 DCB SDCO 0 JP PROPOSED s· _.:c,__55·--- 15• -=--so,--- 6" --SD-- 6" ---w·--- 4• --"'--FW.,_ __ _ ---D1WW'---- 4• _ _,;,:,__/RR'--- -x--x- 2· ---1G,--- ---c·--- --... ao--- ---,89,--- FG 95.94 2: I Ill --• ssco • cl SDCO • :llo 9 * --0- -0- CONSTRUCTION DETAIL REFERENCE DETAIL REFERENCE SHEET REFERENCE ABBREVIATIONS AB AC AD ADA ASB BC BFP BLOG BOS BOW SIC C C.tl/ CB a a. CMP co CONC cmsr CY OCDA DI DIP DOM ow OWG E EC fl' 01 BEV EVM EiC EX.DI/ST. FC FOC Fr FG RI R. /WNO FS FT FW G GB GV HP /NV ,p JT IP IP LSA MAX IEP WI I/IN N NO NTS p PM PCC PIV Pl. POC pp PIE PIC R RC r" so SF SG SMH ss STA STD S/11' ,r; 10 10W 1S nP IC NII IV .. - AGGliml 1F BASF
- AS'HALT ca«RE1F - ARE"A DRAIN - AJIEJ1ICANS "111 O/SABllJ1ES ACT - AGGif't:A1E Sl.E4SE - 6£GA!/NING OF M~ - BACKR.OWPRn9/1DR - BU/WING - BOmJM OF S1fP - FG O BOmJM OF lll4LL
IECIN IER11CAL a.RI£
CONaE1F DR QIIL
- CURB AND GUTIDI - CA 11:11 BASIN - CURB IN1ET - CEN701 LIE DR a.ASS - IXR/IJGA1FD MITAL PIPE -aENN1JT
- CONaE1F - CONS1RIJC71//N DR CONS1RUC1' - aJB/C YA/ill - OOIJBI.£ CH£CK 0£7Er:Trll :4SSRR., - DROP IN1ET
- OIJC1II£ IRON PIPE
- IIDIES11C - IIDIES11C 11111ER - DRAWING - £:AST - ENO OF a.RI£ - WGE OF PAl£JIDIT - ENO OF RDIIRN - B£VA71//N - EM£RfBICY IBI/Q£ ACCESS E:ASEJIENT - ENO IER11CAL a.RI£ - DIJS11NG - FACE OF CURB - FIR£ DEPARTMENT CCNNECTlar - FINISH(1) R.ODR - FINISH(1) GIIAIE - FIIEHYDIWIT - R.OWLIE - FDUNOA110N - FINISH(1) SIJRFACE - FOl)T
- FIRE 1111701 - GRO/JNO B£VA71//N - GIIAIE Bll£AI(
- CA1F VALi£
- 1111/H POINT - /NlfRT BEVA 711/N - JO/NTP<H - JOINT 1IIENQ/ - IP OF GUTIDI - LOW POINT
- LAIIDSCAK ARCHIIFCT
- MAIM/II
- /EalAIIICAL/El£1RICAL/1'WIIBIN
--
--- N0/1111
- NIIIIBER - NOT 1D SCAIE - PAl£JIDIT B£VA110N - PIWA 1F ACCESS E:ASEJIENT - PORn.AND aMENT CONaE1F I
POINT OF CON1/NIJWS Clli'VA II.II£ - POST INDICA1DR VALi£ - PROPDITY LIE POINT ON a.RI£ - PO'IERP<H - PIIBLIC U11JTY E:ASEJIENT - FGUIWll a/1.0/IIIE PIPE - RADIUS - /RUii£ COMPAC71//N
- 11/GHT OF IIIIY - 51.0/'E DR SO/J1H - S1DRII DRAIN - SILT FD/CE --- SII/NAI.IIANl/aE - SANITARY SEIIER - STA7ION - STANDARD - S/OEWALK - 10P OF CURB - 1RENQ/ DRAIN - FG O 10P OF 111111. 10P OF SI.AB
- 1lf'ICAL
- IER11CAL Clli'I£ - llll 1ER IE1D1 - 1111701 VALi£ - IIEST
PLANNING PACKAGE
ALPINE ROAD
PORTOLA VALLEY, CA
KEY MAP
EARTHWORK QUANTITIES
EST/MA TED CUT 5,J27 CY
ESUUA 1EP RU 5, 154 CY
ESTIMATED BALANCE 173 CY
THE EARTHWORK QUANTITIES SHOr,r,t ARE PROVIDED FOR THE PURPOSl' OF GRADING PERMIT APPROVAL ONLY. SI.AB AND PA VEUENT THICKNESS ASSUMED ro BE 10~ EARTHWORK NUMBERS ro BE CONRRMED BY STRUCTURAL AND GEOTECHNICAL REPORT FOR SI.AB AND PA VEUENT THICKNESS. IT SHALL BE THE CONTRACTOR's RESPONSIBIUTY ro CARRY OUT THE CUT/FILL, IMPORT/EXPORT AS NECESSARY ro MEET THE DESIGN GRADES AS SHOr,r,t ON THE PLANS REGARDLESS OF THE EST/MA TED EARTHWORK QUANTITIES AS IND/CA TED. SIGNIRCANT REVISIONS ro THE QUANTITIES NEED REVIEW BY THE CITY OF PORTOLA VALLEY. RLL SHORTAGE IS ANTIC/PA TED ro COME FROM ON-SITE SPOILS ACQUIRED FROM UTIUTY TRENCHES AND FOOTING SPOILS.
UNAUTHORIZED CHANGES AND USES
t:AlJTIOII: TIE ENGINEETt M£ Ml'«; TIES£ PI.NIS Ill NOT 8£ RESPONS/BI.E FDR. DR LWJl£ FDR, /JNAIJIIIDRJZED CHWGES 10 DR USES OF 1HES£ PIANS. NL CHWGES 10 11£ PIANS I/UST IE IN WRll1NG AND 1111ST IE N'PRtMD BY 11£ PRfPARD1 OF 11£ PIANS.
VICINITY MAP
N.T.S.
PROJECT DESCRIPTION
FLAT PORTION OF LAND ALONG ALPINE ROAD
SURROUNDED BY STEEP, HEA Vil Y WOOOED HILLSIDES.
DEVELOPMENT lltll BE ON APPROX1MA TEL Y 6 ACRES OF
AREA ON NORTHEAST CORNER OF THE PARCEL SINGLE
FAMILY HOMES AND TrJr,r,fHOMES/APARTMENTS ro BE
DEVELOPED FOR STANFORD HOUSING AND BELOW MARKET
RA TE HOUSING PURPOSES. THE TENTA 111£ SUBDIVISION
SHOr,r,t HEREJN IS S/18.ECT ro Rl/NG OF MUL 1/PLE RNAL
MAPS BY TH£ SUBDIVIDER IN ACCORDANCE 'MTH Sl'CTION
66456.1 OF THE SUBDIVISION MAP ACT.
OWNER INFO
STANFORD UNIVERSITY
CONTACT PERSON: JOHN D. DONAHO£
415 BROADWAY. 3RD FLOOR. MAIL CODE 8873
RED'NOOD CITY, CA 94063
PH: (650) 724-4913
CIVIL ENGINEER INFO
SANDIS
ENGINEER OF RECORD: CHAD BROr,r,//NG R.C.£. NO. 68315
CONTACT PERSON: NA TE DICKINSON
1700 S. 'MNCHESTER 81. VIJ. S/JITE 200
CAMPBEl.L, CA 95008
PH: ( 408)636-0900
EMAIL; NDICKINSONOSANDIS.NET
CIVIL SHEET INDEX
Sheet Title Sheet Description
C-7.0 COVER SHEET
C-2.0 TOPOGRAPHIC SURVEY
C-2.1 TOPOGRAPHIC SURVEY
C-3.0 LOT AND PARCEL PLAN
C-3.1 LOT AND PARCEL PLAN
C-3.2 LOT AND PARCEL PLAN C-4.0 DEMOLITION PLAN
C-4.1 TREE DISPOSITION
C-4.2 TREE DISPOSITION C-5.0 GRADING AND DRAINAGE PLAN
C-51 GRADING AND DRAINAGE PLAN
C-5.2 SECDONS
C-5.J TRAIL MAP
C-6.0 UDUTY PLAN
C-6.1 UDUTY PLAN
C-6.2 UDUTY PLAN C-7.0 STORM WATER MANAGEMENT PLAN
C-8.0 WATER POLLUTION CONTROL PLAN
C-8.2 BEST MANAGEMENT PRACDCES C-9.0 FIRE ACCESS PLAN
I SIEGEL & STRAIN Architects
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-2.0 TOPOGRAPHIC SURVEY 1"=120' PLANNING REV. 3 11/10/20 SURVEY NOTES SCALE i"=ISO' &<t Ofi 8M ~· ~~,,,, "*~ 1- PAFICB.: =--;<-~--- ___. < ~"INQ<:A \ DEVEL Ro\ AREA >\~{!R ® - ', KEY MAP N.TS I SIEGEL & Sr RAIN A . rch1tects I !:!II (U'(?'c'i,~~ ' ~ IM :,,hi/,-~ ~~~/~ ~,,;~ ~-~\\l,t11... iln"--\~ ~~.... =-- y../ l . -----" - /llL-!1§~ - ' -~ .. J!, :;:ce, . = 's \~ \\N =:-::: ~ ~~:x'--1• "f~A -~ \~/7)//N cJ:tj,~~=~ '- /;, 1 \ \ ~- ----= 11 wn- ~~r+-- //PU J.,,k7/ ~~,>·~'. . ... ~~'!\ . ..... • )Jl!{/)1:ji ~c ;:= 111¼1/df:. ((> . < ~'2 · /(/> • "fl- +-• ~-........ ~:/ ),~\iff/&Jlj(/1i)/ii£~\: ; 1 4, .. Yj('i:: , ~)) lJ ~/ff .. ·· I \ \cf;•:\~\~IJ/f#(iffl~cc/&?~ ········• · ., l~-1/t~¥J;t>;; 1 ~/
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-2.1 TOPOGRAPHIC SURVEY 1"=40' PLANNING REV. 3 11/10/20 ' em,m oc m , :;,me m~Trn':. ITTC w,wem •/i ' .'" mm e;,;;;;;;cm,m,, '"" NOTE TOPO PROWDED c:~RPOOURNfOL/AS ~AULPLPfEM"NccD BY "H' C n,c,,;n ,on';, rm•= m,;;-"; • COCC~ ;m=cm~::rc c,mme:n~c:; =me OC , , , , , , , ,,m '" m mm/"'"'"' , ;~;7;" mm ,,J,,;;'; ,w,,mm, ;']:J; m m BASIS OF BEARIYN BOUNDARY Efifi~11ci%¥:tai~ 0 GS NOTE :Nr~E;ff~1RP//t Ri;::1~lx{ ONLY LOCATi . REASONABL OF SUCH u ' TENT! me ~,em,; , me e mm , m ,mu,;;/:;[{;m n ;, ,n;::;;,;"' ,J;77Jz;:''(;/ / c a me oc,mm oc'(m m mn '°'" mm,m, nn mmm ,,ccm m :;;-,m,n /'m me ""rre ";•=mmm me cm~,:-' m'm"m cc=n! ,~ ew m mmccemmc ,; ,"m m =m,;;.~e =w c m , ,,,/~ m me, ,m J'"'mcc=cc/""'° m / f;f£! :r:,;[/!:Ftrr:::f :2::;,,7:::;;m "' "' mm"700" ,,;, :::;.' m mX' \,J[,p:m,,;;:;/ ';;;";1it!e 1 ~~T;:~y 3B4:
38 y 3 qO i
SHOWN
::;;;:;;;!./;:; ;:,:;::if:i;J:f:3:':::;'>:;;:/::::,:1//¼~~~ 1///1/j)( ~· ;ff}!f/idf"\:;.i§::.:;;:;::};3ii~;iff J7fa ,:,,. // ~· ~, ;:;gff(f;/ffif:Y?,; ;,A!/> ~,' ?!;!/ t~
~;:::J: / S-._ _ _/Y,8'- /
:::.~:.;.>>>:< ,.'!,' ei?~ 8<;~~
'f::;/':.1/ <:;,;;: ' . ,' m'
0 "
ff;;% <o~<: 6 97 ~%;:% ~-"):
~1/
1/-::3 ~-:5))".Jt:r::J?~
"_____./
-
-
5501
------------- ----------
-------
-------------
J
C -Jo
-
_........- _.
G
=----------
7:ss ss
KEY MAP
N.T.S.
ss
--------------
-------- -------- -------
---------------
---------------
SCALE: 1"=40,
ss oi -~ nw ss
I SIEGEL & s TRAIN Architects I
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-3.0 LOT AND PARCEL PLAN1"=40' PLANNING REV. 3 11/10/20 I G) 0 r 0 ' / l•) / lJ1- / I I I NI '411'21 "£ 101.98' Nn'48'01"W Z67' CJ
lD
NJ2'26'45"£ 96.J6'
I
NJ6'26'45"£ 7Z22'
LANDS OF THE BOARD OF TRUSTEES
OF LELAND STANFORD JR. UNIVERSITY
APN. NO 077-281-020
2,BOJ,J7J± SQUARE FEET OR 64.365 ACRES
PARCEL Z FOR ENLARGED SHEET SEE C-J. 1/
J7
NJJ"41 '45"£ 76.56'
N70'29'04"E: 68.25'
N64'44'04"£ 52. 12'
PARCEL Y
lD
"'
J.,
Js
ISi
\
\
I
\
2'.,
0 -
CJ
S6rJ0'OO"E: 72.68'
w
> -
a:
0 w
0 0
-
g:
CJ)
w
I
c_j_
LEGEND
,--7
L
__ _J
PROPOSED PARCEL LINE
EASEMENT LINE
SCALE 1"=150'
I SIEGEL & STRAIN Architects
/
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-3.1 LOT AND PARCEL PLAN1"=40' PLANNING REV. 3 11/10/20 LOT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 A 8 C y z TOTAL AREA (SQFT) 4,092 4,407 4,349 4,274 3,372 3,580 3,922 3,679 3,035 2,981 3,756 4,777 4,569 5,122 5,217 4,044 4,014 4,020 4,024 4,029 4,197 4,237 4,859 4,464 4,496 3,840 4,168 7,386 6,938 8,188 338,955 2,803,737 3,276,728 I tl1 AREA (ACRES) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 7.8 64. 75.2 j<JI ~/ION PARCEL giv PROP£RTY UN£ ~I "'1 PARCEL Z ---- =--'----------==::::::::- - - - - - N1J'07'01"£ J50. 00' < - - - - - - - / / PARCEL Y ,.._~~ JO' P.U.£. I I - - - - - ' ' - - - - - - - - 18,436-SQFT-/- - - - - N0'55'09"W 20.61' OED/CA TED AREA COIi/iON PARCEL PROPERTY UN£ - - - - - - - - - - / "'-"' - - - - - - ' ' \ L48- r k<!, \; ~E; !ll--, ..,_ l<l "' - - - - - N1J'Ol'01"£ 906.76' - - ' ' L5J "'- l<l ... ' ' I \ J4' ROAD - - - - - - ' --..,..::-S6rJO'OO"£ 72.68' - - - - - ' ' \ ' PROPOSED ROW - 100' - - I I - - - - - LEGEND ,--7 L __ _J PROPOSED PARCEL LINE CENTER LINE SCENIC SE TBA CK LINE EASEMENT LINE PARCEL NOTES SCALE: 1"=4D' I. DISTANCES BETWEEN PROPOSED BUILDINGS HILL RANGE FROM APPROX/MA TEL Y 9 TO 33 FEET, AND CERTAIN BUILDINGS WILL BE ADJOINING WITH NO DISTANCE BETWEEN BUILDINGS. 2. DISTANCES BETWEEN PROPOSED BUILDINGS AND PROPERTY LINES HILL RANGE FROM APPROX/MA TEL Y 4 TO 38 FEET, AND CERTAIN BUILDINGS WILL ADJOIN PROPERTY LINES HITH NO DISTANCE BETWEEN THE BUILDING AND THE PROPERTY LINE. J. COMMON PARCELS Y, AND Z WILL BE RESERVED FOR OPEN SPACE PURPOSES UNDER SEPARATE INSTRUMENT JO' P.U.£., E. V.A.£., P.A.£ ' ' \ CENTER UN£ ' ' 100' RIGHT OF WAY - - - - - - - - - - - - - - - - - - - - - - - N2 . • ~9 10"£ 111.88 • I SIEGEL & STRAIN Architects
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-3.2 LOT AND PARCEL PLAN1"=40' Une Table Une Table Une Table UI• Tab/ti Une Tab/ti Ome Table Une/ Length Dht:tlon Une/ Length Dht:tlon Une/ Length Dht:tlon Une/ ungth Dht:tlon Une I Length l)j11etJon °""' I Length RodNS Delta LI 125.88 S2r JS' 29.22-w L27 88.97 569" 16' 00. IJ"W L57 65.0J 569' 05' 00.00"W L84 95.97 N20' 45' 59. lJ"W l/09 25.99 569' 14• oo.2rw Cl 18.54 105.J2 N70' 01' 48.52-W L2 51.57 561' 27' J7.28"E L28 42.00 520' 48' OB.JI "E L58 11.88 S25' 45' 00.65-W L85 43.46 569' 05' 00.00"W LIii 1J.5J 517' 12' 52.02"E C5 IJ.90 105.J2 N59' 56' 45.90-W LJ IJl.74 NIJ' 07' 08.56"E l29 86.34 N69' IJ' 4J.64"E L59 121.60 559' 14' 59.J5"E L86 95.97 520' 45' 59. lJ"E L112 142.50 N69' 14' 00.27"E C9 27.49 105.J2 N52' 22' 57.74"W L4 106.70 552' J9' 29. 71"W LJO 42.02 Ntr 12' 52.02-W L61 43.66 N29' J6' 00.67"W L87 43.94 N69' 14' 00.27"E LIIJ 50.80 N20' 45' 59.lJ"W CIJ Jt.78 105.J2 NJr 25' 41.ll"W L5 66.41 SJ4' 50' 24.25"E LJI 26.Jl Ntr 12' 52.02-W L62 55.24 NJ6' 06' 48.BJ"W L88 96.09 N21' 02' 58.58"W L114 142.50 569' 14• oo.2rw C14 7.77 9o.J6 N25' 17' 46.50-W I SIEGEL & STRAIN Architects I L6 125.88 N2r Jg' 29.22"E LJJ 88.95 569' 14' J0.21"W L6J 54.JO 569' 05' 00.00"W L89 34.05 575• 17' OJ.J9"W L115 J5.JJ 517' 12' 52.02"E C15 J6.59 9J.J6 NJO' 24' 4J.81"W Ll 104.99 569' 17' 22.22-W lJ4 34.0J 520' 45' 29. 79"E L64 55.24 SJ6' 06' 48.BJ"E L90 J.66 568' 26' 29.Bl"W L/16 25.00 N71' 11' 04.55"E C16 24.41 61.J9 N70' 40' 08.24"W LB 57.28 SJ4' 50' 52.96"E LJ5 88.27 N69' 14' J0.21"E L65 43.66 S29' J6' 00.67"E L91 129.78 51J' 07' J4.72"W LIil 14.70 518' 48' 55.45"E C20 Jl.57 94.42 N54' OJ' 45.54"W L9 106.70 N52' J9' 29.71"E lJ6 79.99 569' 14' J0.2t"W L67 2J.45 N69' 14' 00.27"E L92 J9.92 N69' 14' 00.27"E L118 120.20 N69' 14' 00.27"E C21 43.18 61.J9 N47' 5J' 00.50"W LIO 101.25 569' IJ' 57.55"W LJl JJ.97 520' 45' 29. 79"E L68 95.5J N20' 45' 59. 75"W L9J 125.51 NIJ' 07' 00.84"E L119 16.42 N20' 45' 59. lJ"W C22 24.43 61.J9 Nor J5' to.5J"W LIi 41.96 520' 45' 59. lJ"E LJB 92.95 N69' 14' J0.21"E L69 42.00 569' 05• oo.oo·w L94 7J.8J 569' 14• oo.2rw L120 12o.20 569' 14' 00.27-W C2J 25.86 61.J9 N15' IJ' 01.90"E l12 104.99 N69' 18' 26.6J"E L40 71.67 569' 14' J0.21"W L70 95.5J 520' 45' 59. 75"E L95 108.81 512' 5J' 45.96"E L121 15.JO 518' 48' 55.45"E C24 2o.67 61.J9 NJ9' 21' 09.2J"E l14 10.76 Ntr 12' 52.02-W L41 42.01 520' 45' 59. lJ"E L71 41.99 N69' 14' 00.27"E L96 16.JJ N69' 14' 00.27"E L122 25.84 571' 11' 04.55"W C25 9.59 61.J9 N58' JB' J2.J9"E Ll5 34.07 Ntr 12' 52.02"W L42 108.15 N69' 14' 15.67"E L72 95.64 N20' 45' J6.89"W L97 129.84 NIJ' 07' 34.72"E l12J 48.67 517' 12' 52.02"E C26 2o.99 110.J6 SJ5' 25' J2. 16"E l16 100.24 569' IJ' 57.55"W L4J 9J.27 582' 2J' 18.J6"W LlJ 42.00 569' 05• oo.oo·w L98 45.99 569' 14• oo.2rw Ll24 118.29 N69' 14' 00.27"E C27 46.48 85.J2 SJr 11 • 50.5J"E Lil 34.00 520' 45' 59. lJ"E L# 6J.19 520' 45' 59. lJ"E L74 95.64 520' 45' J6.89"E L99 107.94 5tr 42• t4.J9"E l125 56.09 NIJ' 07' 00.84"E LIB 98.IJ N69' IJ' 57.65"E L45 95.95 N69' 14' J0.21"E L75 42.01 N69' 14' 00.27"E LIOO J6.85 N69' 14' 00.27"E L126 9o.14 569' 14' 00.27-W L19 106.J5 569' 14' 00.57"W L47 110.J2 N76' 52' 25.28"W L76 95.75 N20' 45' 59. 7J"W L101 108.81 N12' 5J' 45.96-W l127 42.08 517' 12' 52.02"E l20 34.00 520' 45' 59. lJ"E L48 JB.77 SOJ' 4J' 25.05"W Lll 42.00 569' 05• oo.oo·w L102 46.81 569' 14• oo.2rw L128 92.74 N69' 14' 00.29"E L21 104.24 N69' IJ' 57.55"E L49 27.90 SJ4' 42' 19.86"E L78 95.75 520' 45' 59. lJ"E LIOJ 107.87 S2J' 07' 09.25"E l129 42.00 N20' 45' 59.lJ"W l22 34.06 Ntr 12' 52.02-W l50 9J.27 N82' 2J' 18.J6"E L79 42.00 N69' 14' 00.27"E l/04 J6.62 N69' 14' 00.27"E LIJO 5o.59 569' 14' 00.27-W L2J 42.09 Ntr 12' 52.02"W l52 28.74 S25' 45' 00.65-W LBO 95.86 N20' 45' 59. 7J"W l/05 107.94 NI r 42' 14.J9"W LIJI lJ.55 51J' OJ' 00.27-W L24 94.66 569' IJ' J2.89"W L5J J4.12 SOJ' 4J' 25.05-W L81 42.00 569' 05• oo.oo·w L/06 60.26 NJ4' 01' 01.95"W LIJJ 12o.49 NIJ' 07' 00.84"E L25 41.99 520' 42' 02.34"E L54 110.J2 576' 52' 25.28"E L82 95.86 520' 45' 59. lJ"E LIOl 105.43 569' 14• oo.2rw l26 92.10 N69' 14' 00.27"E L56 121.60 N59' 14' 59.J5"W LBJ 42.00 N69' 14' 00.27"E LIOB 24.46 S21' 15' 47.28"E
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-4.0 DEMOLITION PLAN 1"=40' PLANNING REV. 3 11/10/20 SCALE: 1"=40' DEMOLITION LEGEND DEMOLISH AND REMOVE COMPACTED GRA VEl AND ANY ASSOC/A TED BASEROCK STABILIZE THE EXISTTNG SUBGRADE. DEMOLISHED MATER/Al MAY BE USED AS BASEROCK IF APPROVED BY GEOTECHNICAl ENGINEER - DEMOLISH ANO REMOVE CONCRETE INCLUDING ANY ASSOC/A TED BASEROCK AND REBAR STABILIZE THE EXISTTNG SUBGRAD[, DEMOLISHED MATER/Al MAY BE USED AS BASEROCK IF APPROVED BY THE GEOTECHNICAl ENGINEER CLEAR AND GRUB EXISTING LANDSCAPE AREA SO NO ORGANICS ARE STTll L.:..:..:..:J PRESENT - - - LIMIT OF WORK LINE - /- /· /- /- REMOVE EXISTTNG FENCE INCLUDING ASSOC/A TED FOOTTNGS RETURN FENCE TO OWNER ~"'f~~~- mi;,,x~~w~ •··~·· :~~Jf/ffJJ;~~~r:::;/::; ~r~~11jt': -~_,,,, "'"-- -N //1\ f§ o/ ~;::#J!jf jf 1////4 /i / ~/ / / yq~,,,,/ c,,v-, \{\ TREE PROTECTION NOTES I All EXISTTNG TREES THAT ARE NOT SPECIF/CALLY CALLED OUT FOR REMOVAL ARE TO BE PROTECTED IN PLACE. SEE LANDSCAPE DRAVv/NGS AND ARBOR/ST REPORT FOR TREE PROTECTION REQUIREMENTS J~',<; '?~fj;:g:~{§:i~?fif~//j1/J,,, //2 / ~,// .,.,,,,,., ~' ' 0 ,'' ':) ~¥: AA~/t;// 0;:;" / / _/ / 0 /;:;;/// 89 ""'Y- '~~' C \ \/ .ff~~ l / /// / ' ~= \ \\ 1/J:;: / Rf~~ 1 > /~C'A>. "" /;;;/ lc~ 'A"X&i.! ~ x \~ // if)I/Y'/ ' ' J» ½~1/ / <Iv.'>- ,--, / fl'"'- \ 0/ ?\ * // J",!Q,/'1', ;0o/.-~ ~;Jy; -~- ,I\:'::! ~~~ tf; . ,.-,,k , ;Y'~ "-"' / / ' 2 REFER TO SHEET C-4 I FOR TREE DISPOS!nON "\/4 / I SIEGEL & STRAIN Architects %"1/1/1/ , ' , SHED ~~1/ ' ' ~1/ 1/ I/ /0 ) 1----------1 l -~885 40l"ciCLllim'ic- / / ,o l§ LUST 5501 ::1.§8 EP INV15 INS)'44.1' 1iv 15' c,JT(N) J42.J4 --- ' ' fe: fe: + ":,":,'!)~ e: "' fe: ' ' ' ~.:.:.~:•- ;.' -::1' ' ' ' ' ' ' ' ' ss ss - Cll ~/ ss / ss / / f----1------l-----1 ss
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-4.1 TREE DISPOSITION PLAN 1"=40' PLANNING REV. 3 11/10/20 ~8----85 40 CL / ---- 0 s~---- IA~! ~s --=~? ~b:i;<; -~--
TREE DISPOSITION LEGEND
- - - LIMIT OF WORK LINE
SIGNIFICANT TREE TO BE REMOVED
NON-SIGNIFICANT TREE TO BE REMOVED
SCALE: 1"=40'
• • • • TREE TO BE REMOVED NOT LISTED IN ARBOR/ST REPORT TREE TO REMAIN PROTECT IN PLACE /
- -
!;;'.c =c ----
----
-
----
__,
---
----:::=c=c:::c;~
-- 7,,/: =c3;/
I SIEGEL & STRAIN Architects I
/ / r---+---_j_ _ _J
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-4.2 TREE DISPOSITION 1"=40' PLANNING REV. 3 11/10/20 CONDITION (O=OEAO, REASON FOR CONDITION (O=DEAO, REASONFOR CONDITION (O=DEAD, REASON FOR TREE TAG TRUNKSIZE TYPE SIGNIFICANT? 5=EXCEUENT} REMOVAL TREE TAG TRUNKS/ZE TYPE SIGNIFICANT? 5=EXCELLENT} REMOVAL TREETAG TRUNK SIZE TYPE SIGNIFICANT? 5=EXCEUENT} REMOVAL T-3 17" OAK Yes 2 Poor Condition T-5530 6" OAK Yes 1 Poor Condition T-5785 16" OAK Yes 2 Site T-11 7" OAK No 2 Poor Condition T-5531 20" OAK Yes 3 Grading T-5786 16" OAK Yes 3 Site T-12 6" OAK No 2 Poor Condition T-5533 10" OAK Yes 3 Site T-5787 9" OAK No 1 Grading T-13 7" OAK No 2 Poor Condition T-5534 10" OAK Yes 3 Site T-5788 18" OAK Yes 1 Poor Condition T-19 6,6n OAK Yes 2 Poor Condition T-5535 16" OAK Yes 4 Grading T-5791 21" OAK Yes 2 Poor Condition T-20 15,Bu OAK Yes 3 Site T-5536 18" OAK Yes 3 Sight Distance T-5792 25,18" OAK Yes 3 Site T-21 14" OAK Yes 3 Site T-5537 6" TREE N/A N/A Site T-5793 7,5n BAY No 3 Site T-26 7,7'1 PM Yes 1 Poor Condition T-5538 16" OAK Yes 2 Sight Distance T-5794 6" OAK No 3 26 T-4851 10" OAK No 4 Grading T-5539 18" OAK Yes 3 Sight Distance T-5795 14,14n OAK Yes 2 Grading T-4852 10" OAK No 2 Grading T-5540 16" OAK Yes 3 Sight Distance T-5796 9" OAK No 2 Site T-4853 16" OAK Yes 4 Site T-5541 15" OAK Yes 3 Sight Distance T-5797 10" OAK No 3 Site T-4854 12" OAK Yes 3 Grading T-5548 24 OAK Yes 3 Site T-5798 9" OAK No 3 Site T-4855 12" OAK Yes 4 Swale/Site T-5549 23" OAK Yes 3 Grading T-5799 13" OAK Yes 3 Site T-4856 8,5" OAK Yes 3 Swale/Site T-5552 20,15,15,8" OAK Yes 3 Site T-5800 6" OAK No 2 Site T-4857 14" OAK Yes 3 Grading T-5559 5,5" OAK No 0 Poor Condition T-5910 16" OAK Yes 0 Grading T-4858 SA,2" BUCK No 4 Site T-5560 28" OAK Yes 4 Site T-5919 7,6n BUCK No 3 Swale/Site T-4859 11,r OAK Yes 2 Grading T-5561 10" OAK No 3 Site T-5920 19" OAK Yes 0 Swale/Site T-4862 8" OAK No 2 Poor Condition T-5573 8" OAK No 2 Poor Condition T-5922 22" OAK Yes 4 Site T-4863 24" OAK Yes 4 Swale/Site T-5563 10,18" OAK Yes 4 Site T-5923 9,5,4n BUCK No 4 Swale/Site T-4864 11,7,68 OAK Yes 2 Grading T-5564 30" OAK Yes 2 Poor Condition T-5924 6" OAK No 3 Swale/Site T-4865 9" OAK No 3 Grading T-5575 6" OAK No 2 Site T-5925 12" OAK Yes 4 Site I SIEGEL & STRAIN Architects I T-4868 14" OAK Yes 3 T-5576 18,16" OAK Yes 3 Grading T-5926 14" OAK Yes 3 Swale/Site T-4861 12" OAK Yes 1 Grading T-5577 14,10" BAY Yes 3 Grading T-5927 7" OAK No 3 Site T-4866 16" OAK Yes 3 Grading T-5579 14" OAK Yes 3 Grading T-5928 9" OAK No 1 Swale/Site T-4867 13" OAK Yes 3 Site T-5580 10" OAK No 3 Grading T-5929 12" OAK Yes 3 Swale/Site T-4869 14" OAK Yes 3 Site T-5581 6" OAK No 3 Grading T-5930 7" OAK No 2 Site T-4870 14" OAK Yes 4 Grading T-5582 5" OAK No 3 Grading T-5931 15,14,13" OAK Yes 3 Grading T-4871 7,~4,4" BUCK No 4 Grading T-5583 18,12" OAK Yes 2 Poor Condition T-5932 7" OAK No 3 Grading T-4872 8,6" OAK Yes 3 Site T-5702 27,14" OAK Yes 4 Grading T-5933 18" OAK Yes 4 Grading T-4873 23" OAK Yes 4 Site T-5724 12,14" OAK Yes 3 Site T-5942 13" OAK Yes 3 Site T-4874 18" OAK Yes 4 Grading T-5734 10" OAK No 3 Site T-5958 16" OAK Yes 4 Site T-4875 18" OAK Yes 3 Grading T-5735 10" OAK No 3 Site T-5963 5,4,3,3n BAY No 4 Site T-4876 12" OAK Yes 1 Grading T-5737 7" OAK No 2 Site T-5964 5" BAY No 4 Grading T-4877 22,1sn OAK Yes 4 Site T-5739 9" OAK No 1 Poor Condition T-5970 6" BAY No 2 Poor Condition T-4878 16" OAK Yes 3 Site T-5740 9" OAK Yes 3 Site T-5971 10" BAY No 2 Poor Condition T-4879 16" OAK Yes 3 Site T-5742 9" OAK No 2 Poor Condition T-5975 19" OAK No 2 Site T-4880 12" OAK Yes 2 Site T-5743 12" OAK Yes 2 Poor Condition T-5976 8,6n OAK Yes 3 Site T-4881 18" OAK Yes 2 Grading T-5756 15,14" OAK Yes 4 Site T-5977 6" BUCK No 2 Site T-4882 18,16" OAK Yes 3 Site T-5757 22" OAK Yes 4 Grading T-5980 32" OAK Yes 3 Site T-4883 12" OAK Yes 3 Grading T-5758 14" OAK Yes 3 Site T-5981 6" OAK No 2 Site T-4884 18" OAK Yes 2 Swale/Site T-5759 17" OAK Yes 2 Site T-5982 6" OAK No 3 Site T-4885 10" OAK No 3 Swale/Site T-5761 28" OAK Yes 3 Site T-5983 20" OAK Yes 1 Site T-4886 24" OAK Yes 4 SWale/Site T-5762 16" OAK Yes 4 Grading T-5984 16" OAK Yes 3 Site T-4887 28" OAK Yes 4 Grading T-5765 12" OAK Yes 4 Site T-5985 12" OAK Yes 3 Site T-4888 9" OAK No 3 Site T-5766 14" OAK Yes 3 Site T-5986 8" OAK No 3 Site T-4891 9" OAK No 0 Poor Condition T-5770 14,14" OAK Yes 3 Site T-5987 21" OAK Yes 4 Grading T-4892 17" OAK Yes 2 Poor Condition T-5771 21" OAK Yes 3 Site T-5988 16" OAK Yes 3 Site T-4893 18" OAK Yes 4 Grading T-5772 28" OAK Yes 4 Grading T-5989 lAu OAK Yes 3 Site T-4894 19" OAK Yes 3 Grading T-5773 10" OAK No 3 Site T-5990 1s,1sn OAK Yes 3 Grading T-4895 21,1sn OAK Yes 4 Site T-5774 16" OAK Yes 1 Grading T-5991 12" OAK Yes 3 Grading T-4897 24" OAK Yes 4 Swale/Site T-5775 18" OAK Yes 3 Site T-5992 6" BAY No 3 Site T-4899 20" OAK Yes 2 Poor Condition T-5776 17,14" OAK Yes 3 Site T-5993 5" BAY No 3 Site T-4953 20" OAK Yes 3 Swale/Site T-5777 22" OAK Yes 3 Site T-5994 12,10n OAK Yes 3 Site T-4954 11,sn OAK Yes 2 Swale/Site T-5778 13" OAK Yes 2 Site T-5995 16" OAK Yes 4 Grading T-4955 18" OAK Yes 4 Grading T-5779 14" BAY Yes 3 Site T-5996 9" BAY No 3 Site T-4988 20" OAK Yes 2 Poor Condition T-5780 10" OAK No 2 Site T-5997 12" OAK Yes 3 Grading T-5520 6.6.4.4.2.2" BUCK No 3 Site T-5781 1°'10" OAK Yes 2 Site T-5999 18" OAK Yes 4 Grading T-5523 12" OAK Yes 4 Grading T-5782 12" OAK Yes 1 Site T-6000 14" OAK Yes 3 Grading T-5524 8,6" OAK Yes 3 Site T-5783 16" OAK Yes 2 Site T-5526 45" OAK Yes 3 Sight Distance T-5784 9" BAY No 3 Site Total Significant Trees 121 Total Non-significant Trees 54 Total Trees ta be Removed 177
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-5.0 GRADING AND DRAINAGE PLAN1"=40' PLANNING REV. 3 11/10/20 I /1((~ ~, -~i\ :;:::J)(Y/ \4\YAY. ~;J/);)11/;I i\\1f\f i~-lli I ! A,-. .• rill~ /JR?) 1 u ::::~ 11 y§~~,,1?1110\}\;,~ ~:;'~r~~t1f~t"/_;;? !/~@i~ m WJI 111 11 11 I ,\\\\\\\\\\\ · LEGEND
-194-
-1195-
,--------/ ,--------/ ,--------/ ,--------/
,-------/ ,--------/ ,--------/ ,--------/
,--------/ ,--------/ ,--------/ ,--------/ ,--------/ ,--------/ ,--------/ ,--------/ SCALE 1"=150'
PROPERTY UNE
SAWCUT LINE
DIRECTION OF STEEP SlOP[
FlOW UN[
GRADE BREAK
RETAINING WALL
CONTOURS
AC PAVEMENT
8/0-TREA TMENT AREA
FIRE ACCESS ROAD EARTHWORK QUANTITIES
I SIEGEL & STRAIN Architects I
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-5.1 GRADING AND DRAINAGE PLAN1"=40' PLANNING REV. 3 11/10/20 11,r+~~~ ¥r-=+:=====-~ -~,----~~~ I ~ - .------------ ------- - 0 ci ITT n~ ITT w G G n 1 "AINING Ill ,S.LP. . 0£ "Al~ (S.LP. DETAIL CM G 4" GAS~ ~-------- _NTJW'o1~~ ~ /2 :si::i =------- 1// --------
SAND IS
W ffillLIL~W
SCALE: 1"= 40,
LEGEND
PROPERTY LINE
SAWCUT LINE
DIRECTTON OF STEEP
FLOW LIN[ SLOPE
GRADE BREAK
RETAINING WALL _,94- 195- CONTOURS
ss ss
C SOCS V -- --------
ACTUAL LO S ALED I~ -------------- IJ)e1';TION IN LINES UNK~;E OOCLlMl;!',JI,- _,
- co {m~ - ACW" / _/ / / - =-===~
/
----- ~,,,-,,- -
--------- -
-
--------
AC PAVEMENT
8/0-TREA TMENT AREA
ss
-
-----
ss -
---- ai ss nfu
----- N2'49'10"E lff:88
I SIEGEL & 5 TRAIN Archit ects I
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-5.2 SECTIONS1"=40' PLANNING REV. 3 11/10/20 \ \ /. \ COMMON AREA ENHANCED GRADING PROPOSEO BUILDING IE"GETA 771£ SWALE FF£= 35250 M! _$ . ~ ,, ~ , 1 -m-111m_111m_111m_111m_111m_111m_111m1 =I I l=I I l=I I l=I I l=I I l=l·l l=I I 1=111 1111 I -111 111111~111~111~111~111~111~111~111~1 SECTION 1 ALPINE ROAD f FF£= J49.50 HORIZONTAL SCALE: 1''~5• VERTICAL SCALE: 1'"~5• RETAINING WALL HORIZONTAL SCALE: 1''~5• VERTICAL SCALE: 1"~5' ROW I f BIOR£1£N770N AREA MAXIMUM DEPTH SHALL NOT £XCEEIJ 8" HORIZONTAL SCALE: /"~5' VERTICAL SCALE: 1"~5' ROW 6" ROLLED CURB r 6" ROLLED CURB FL 347.50 FL 347.50 UP 347.60 UP 347.60 2.ur. 2.U,. -
HORIZONTAL SCALE: 7"~5'
VERTICAL SCALE: 1''~5•
HORIZONTAL SCALE: 7"~5'
VERTICAL SCALE: 1''~5'
I SIEGEL & STR
AIN Architects I
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-5.3 TRAIL MAP1"=40' PLANNING REV. 3 11/10/20 I "1"'11 a • ~~~\\111;1'-'-= -•~ \Tu~" ·::jjj_~- ~.-. I I • 1/ffl-ll-f-; Mr-A-=/ l(j"I I I I , 11: v~ life\\"'\~\\~ /'"~\-•. ~> ,>l~/~~~~/.'rcJ \111111\::;;;™"" -~=.\"°'"(:/. ~ I I ( (~ ' -~\ ~;J/J;)l1/;I ~)1f\fi~)111111 ii 11£,a .• ~1u .~~,::::~ • I ~•wN,,l;l»''",},,~~t~~-~:~¾/fi/_;;?J/~@lm mwJ11 1111 11 I SCALE 1"=150' LEGEND - - - - PROPERTY UN[ TRAIL EXISTING TRAIL TRAIL NOTES /. CONSTRUCTION OF NEW TRAILS/PATHS SHOULD ADHERE TO TOWN OF PORTOLA VALLEY TRAIL/PA TH CONSTRUCTION STANDARDS AND SPECIF/CATIONS 2 TRAILS SHALL BE SIX FOOT MINIMUM 111D TH AND AN ALL WEATHER COMPACTED BASE-ROCK SURFACE 3. TRAIL/PA TH SURFACES SHALL BE SCORED AND MADE NON-SUP AT ANY LOCATION WHERE A TRAIL/PATH TRAVERSES AND DRIVEWAY, SIDEWALK OR ANY OTHER HARDENED SURFACE 4 TRAIL PLAN IS STILL BEING COORDINATED 111TH THE TOWN OF PORTOLA VALLEY, PROPOSED TRAILS SHOWN FOR REFERENCE I SIEGEL & STRAIN Architects I
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-6.0 UTILITY PLAN 1"=40' PLANNING REV. 3 11/10/20 61 I H 0 ~,p"~,~" ( Blf ro c:ro,J) ------------- ---------- ------- - -----------
12' SS SDR-l6
12• SD SDR-J5
w w w w
-------
=---------
• 1
w
ss ss
LEGEND
w
ss
-------
ss
------
GRAvEL ROAD
CMN
w
SCALE: 1"= 40,
-
- N2"4M lff:BB - - I
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-6.1 UTILITY PLAN 1"=40' STORM DRAIN NOTES 7. DRAINS SHOWN ON CIVIL PLANS ARE NOT INTENDED TO 8£ THE FINAL NUMBER AND LOCATION OF ALL DRAINS PLACEMENT AND NUMBER OF LANDSCAPING DRAINS ARE HIGHLY DEPENDENT ON GROUND COVER TYPE AND PLANT MATERIAL CONTRACTOR SHALL ADD ADDITIONAL AREA DRAINS AS NEEDED AND AS DIRECTED BY THE LANDSCAPE ARCHITECT 2. INSTALL SEPARATE SUB-DRAIN SYSTEM BEHIND RETAINING WALLS PER GED TECHNICAL REPORT AND CONNECT TO STORM DRAIN SYSTEM AS SHOWN ON PLANS 3. ALL DOWN SPOUTS SHALL DISCHARGE 0/RECTL YON TO ADJACENT PERVIOUS SURFACES OR SPLASH BLOCKS UNLESS OTHERWISE NOTED ON PLANS 4. A REGIONAL STORMWATER TREATMENT FACIUTY IS PROPOSED TO SERVICE THIS PROPOSED DEVELOPMENT ALL STORM WATER WILL 8£ DIRECTED TO THE TREATMENT PRIOR TO DISCHARGING FROM THE SITE. OAO w---w 0 (1) SANITARY SEWER NOTES 7. ALL SEWER WORK SHALL 8£ IN CONFORMANCE WITH THE COUNTY ENWRONMENTAL HEALTH DEPARTMENT STANDARDS. 2. WEST BAY SAN/TA TY DISTRICT HAS CONFIRMED THERE IS SUFFICIENT CAPACITY WITHIN THE EXISTING MAIN TO SUPPORT THIS DEVELOPMENT BASED ON PREDICTED FLOWS LJ.l __> :/4 ul / I / I LJ.\:/4 0 ul OJ LEGEND --ss-- --so-- -- JT -- --W -- PROPERTY UN[ SANITARY SEWER UN[ STORM DRAIN UN[ JOINT TRENCH WATER UN[ WATER SYSTEM NOTES SCALE: 1"=40' 7. MAINTAIN WATER MAIN UN[S 70' AWAY FROM SANITARY SEWER MAIN UN[S LATERALS SHALL 8£ SEPARATED PER PLAN DIMENSIONS. 2. ALL WATER SERVICE CONNECTIONS SHALL 8£ INSTALLED IN ACCORDANCE WITH THE APPUCABL[ WATER DISTRICT STANDARDS 3. THERE IS NO WATER MAINS LOCATED WITHIN ALPINE ROAD ALONG THE PROJECT FRONTAGE. CALIFORNIA WATER SERVICE COMPANY WILL NEED TO CONFIRM THE EXACT EXTENT OF IMPROVEMENTS NECESSARY TO SERVICE THIS PROJECT I SIEGEL & STRAIN Architects
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-6.2 UTILITY PLAN 1"=40' ROW r ROW I 6" ROLlED CURB 6" ROLlED CURB xi?ob ,l\;~3690~~3 OQ.s/~21 oQo il2aQoo3 0Qil~3690~~3o9 '(c 21 _111~ 11 11 11 i111,,~1r 11-1 -1 -.. ,11 ,,,111, 11 1 II I I I PROPOSED 12· W ~-0PROPOSEO~ 12· SS I I I I , 2' i--t---------20'---------i---=--i SECTION 1 HORIZONTAL SCALE: 1"~5' VERTICAL SCALE: 1"~5' '-PROPOSED JT L
_________________
7 -----
-
~ =;-i
I a I I I
I 1il
I
I
I
}- I
7 ' I
I - \.-, ___s I T .. ,._, ,._, I
.
,.JL
---
I Ill Ill l_ ; _/_ 19
-
I - ~-
-
w
-
I --
I -, IJI I
-
-
- I
7 TYPICAL LOT ENHANCED UTILITIES
LEGEND
---ss---
--so--
--- JT ---
---W ---
PROPERTY LINE
SANITARY SEWER LINE
STORM DRAIN LINE
JOINT TRENCH
WATER LINE
WATER SYSTEM NOTES
/. MAINTAIN WATER MAIN LINES 10' AWAY FROM SANITARY SEWER MAIN LINES LATERALS SHAll BE SEPARATED PER PLAN DIMENSIONS.
2. All WATER SERVICE CONNECnONS SHAll BE INSTALLED IN ACCORDANCE WITH THE
APPLICABLE WATER DISTRICT STANDARDS
3. THERE IS NO WATER MAINS lOCA TED WITHIN ALPINE ROAD ALONG THE PROJECT FRONTAGE. CALIFORNIA WATER SERVICE COMPANY Will NEED TO CONFIRM THE
EXACT EXTENT OF IMPROVEMENTS NECESSARY TO SERVICE THIS PROJECT
STORM DRAIN NOTES
/. DRAINS SHOWN ON Civil PLANS ARE NOT INTENDED TO BE THE FINAL NUMBER AND lOCA T!ON OF All DRAINS. PLACEMENT AND NUMBER OF LANDSCAPING DRAINS ARE HIGHl Y DEPENDENT ON GROUND COVER TYPE AND PLANT MATER/Al. CONTRACTOR SHAll ADD ADDmONAl AREA DRAINS AS NEEDED AND AS DIRECTED BY THE
LANDSCAPE ARCHITECT
2. INSTALL SEPARATE SUB-DRAIN SYSTEM BEHIND RETAINING WALLS PER GEO TECHNICAL REPORT AND CONNECT TO STORM DRAIN SYSTEM AS SHOWN ON PLANS.
3. All DOWN SPOUTS SHALL DISCHARGE DIRECTl Y ON TO ADJACENT PERVIOUS
SURFACES OR SPLASH BLOCKS UNLESS OTHERWISE NOTED ON PLANS
4. A REGIONAL STORMWA TER TREATMENT FACILITY IS PROPOSED TO SERWCE THIS PROPOSED DEVELOPMENT All STORM WATER Will BE DIRECTED TO THE TREATMENT PRIOR TO DISCHARGING FROM THE SITE.
SANITARY SEWER NOTES
/. All SEWER WORK SHAll BE IN CONFORMANCE WITH THE COUNTY ENVIRONMENTAL
HEAL TH DEPARTMENT STANDARDS
2. WEST BAY SAN/TA TY DISTRICT HAS CONFIRMED THERE IS SUFFICIENT CAPACITY
WITHIN THE EXISTING MAIN TO SUPPORT THIS DEVELOPMENT BASED ON PREDICTED FLOWS
I SIEGEL & STRAIN Architects I
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-7.0 STORMWATER MANAGEMENT PLAN 1"=40' HYDROMODIFICA TION NOTE= TH[ PROJECT IS SUBJECT TO HYDROMODIFICA noN R[QU/R[M[NTS PER TH[ SAN MA TEO C 3 TECHNICAL GUIDANCE DOCUMENT THE PROJECT IS SUBJECT TO HYDROMODIFICA TION DUE TO THE SITE 8£/NG LOCATED IN A SUSCEPTTBLE AREA AS SHOWN ON THE HM CONTROL AREA MAP SITE TREATMENT AREA NOTE= THIS PROJECT IS NOT REPLACING MORE THAN 50% OF THE EXISTTNG IMPERWOUS AREA AND THEREFORE MUST TREAT ONLY THE AREA THAT IS REDEVELOPED 1 THIS PLAN PRESENTS METHODS AND CALCULA noNS FOR COMPLYING WITH TH[ REQUIREMENTS OF PROWS/ON CJ OF THE MUNICIPAL REGIONAL STORM WATER PERMIT IN ACCORDANCE WITH THE SAN MATEO COUNTY PROGRAM AND THE CITY OF PORTOLA VALLEY REQUIREMENTS 2 THE FOLLOWING TREATMENT MEASURES ARE PROPOSED TO REGULA Tc THE QUALITY OF STORM WATER LEAVING THE SITE 2 1 SELF-TREA TTNG AREA - RUNOFF IN THIS AREA ORIGINATES IN AND FLOWS THROUGH PLANTTNG PRIOR TO EXmNG THE PROJECT SIT[ NO TREATMENT IS REQUIRED 2 2 BIO-RETENTION AREA - RUNOFF IN THIS AREA IS DIRECTED TO A 810-R[T[NTION PLANTER/AREA FOR FILTRATION, INFILTRA noN AND ...... ,,,, I .., .., .., .., .., .., "" "" "" .., .., .., .., .., .., .., "" "" "" .., .·.·.·.·.·.',',',', . ·1· I "' .., .., .., .., "" "" "" "" "' .., INV15 '"S)'44.1' INV 15' c,JT(N) J42,J4 "" ""'-" o mP rum ( Blf ro c:ro,J) .., .., .., "" "" "" "' "' .., SSWH O RI" 344.55 • (S)--oOi'.'5 -+-- INV15"0JT(N)JJ7,10 '""~"" '"V 15" OOT(E o0 SCALE: 1"=40' STORMWATER MANAGEMENT PLAN LEGEND I::::::::: : : : I PROPOSED P[RWOUS AREA 1·· ..................... .................. ··1 ...................... ..................... .. ......... .. ....... .. ..................... .. ......... .. ....... .. ..................... ---- PROPOSED IMPERVIOUS AREA SELF RETAINING AREA BIO-RETENTION AREA DRAINAGE AREA BOUNDARY FLOW UN£ FLOW DIRECTION / I SIEGEL & STRAIN Architects I / C------+------+------j
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-8.0 WATER POLLUTION CONTROL PLAN1"=40' ------------- ---------- ------- ------------
u' Coe& O ·0, Cl ci
INV151NS)'44.1' - t-'}C)
1iv 15• c,JT(N) ,.,_34
SCALE: 1''=40'
/
s
"'"111·,, ~- ' ... -______ n
-----
G~
LEGEND
STABILIZED EXIT
CONCRETE WASHOUT
SPILL KIT
PORTABLE RESTROOM
CONSTRUCTTON TRAILER
¢:::: PA TH OF SURFACE DRAINAGE
xxxxxxxxxx FIBER ROLL
SILT FENCE
,,. .....
( , _I ' INLET PROTECTTON
x-
----
CONSTRUCT/ON FENCE
LIMIT OF DISTURBANCE
CONSTRUCTTON PARKING
/
ss
______. cri s s
nw
I SIEGEL & STRAIN Architects . I
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-8.1 BEST MANAGEMENT PRACTICES1"=40' ,...
Construiction E~est M~tnagemtent Practices (BMPs)
SAN MATEO COUNTYWIDE
\Nater Polluti1on
Preivention Pro1~ra m
Construction projects are required to implement tlte stormwater best management practices (B:M[P) on this page, as they apply to1 your project, all year long.
Clean Water. Healthy Community.
Materials & VVaste Managemen1t
Non-Hazardons Materials
Benm and cover stockpiles of sand, dirt or other construction material with tarps when rain is forecast or if not actively being used within 14 clays.
Use (but don't overuse) reclaimed water for dust control.
Hazardous Materials
D Label all hazardous materials and hazardous wastes (such as pesticides, paints, thinners, solvents, fuel, oil, and antifreeze) in accordance with city, county, state and federal regulations.
D Store hazardous materials and wastes in water tight containers, store in appropriate secondary containment, and cover them at the end of every work day or during wet weather or when rain is forecast.
Follow manufacturer's application instructions for hazardous materials and be careful not to use more than necessary. Do not apply chemicals outdoors when rain is forecast within 24 hours.
Arrange for appropriate disposal of all hazardous wastes.
Waste Management
Cover waste disposal containers securely with tarps at the end of every work day and during wet weather.
D Check waste disposal containers frequently for leaks and to make sure they are not overfilled. Never hose down a dumpster on the construction site.
D Clean or replace portable toilets, and inspect them frequently for leaks and spills.
Dispose of all wastes and debris properly. Recycle materials and wastes that can be recycled (such as asphalt, concrete, aggregate base materials, wood, gyp board, pipe, etc.)
D Dispose of liquid residues from paints, thinners, solvents, glues, and cleaning fluids as hazardous waste.
Construction Entrances and Perimeter
Establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from site and tracking off site.
Sweep or vacuum any street tracking immediately and secure sediment source to prevent further tracking. Never hose down streets to clean up tracking.
Equipment Managemelllt &
Spill Control
Maintenance and Parking
D Designate an area, fitted with appropriate Bl\~Ps, for vehicle and equipment parking and storage.
Perform major maintenance, repair jobs, and vehicle
and equipment washing off site.
D If refueling or vehicle maintenance must be done
onsite, work in a bermed area away from storm drains
and over a drip pan or drop cloths big enough to collect fluids. Recycle or dispose of fluids as hazardous waste.
D If vehicle or equipment cleaning must be done onsite, clean with water only in a bermed area that will not
allow rinse wa1ter to run into gutters, streets, storm
drains, or surface waters.
D Do not clean vehicle or equipment onsite using soaps, solvents, degreasers, or steam cleaning equipment.
Spill Prevention and Control
D Keep spill cleanup materials (e.g., rags, absorbents and cat litter) available at the construction site at all times.
Inspect vehicles and equipment frequently for and
repair leaks promptly. Use drip pans to catch leaks
until repairs are made.
Clean up spills or leaks immediately and dispose of
cleanup materiials properly.
D Do not hose down surfaces where fluids have spilled.
Use dry cleanup methods (absorbent materials, cat
litter, and/ or rags).
Sweep up spilled dry materials immediately. Do not
try to wash them away with water, or bury them.
Clean up spills on dirt areas by digging up and
properly disposing of contaminated soil.
Report significant spills inunediately. You are required by law to report all significant releases of hazardous
materials, including oil. To report a spill: 1) Dial 911 or your local emergency response number, 2) Call the
Governor's Office of Emergency Services \Varning
Center, (800) 852-7550 (24 hours).
l~arthmoving
.,-,. ,, ,, ~,1~ '..if(',·•,
Schedule grading and excavation work
during dry weather.
D Stabilize all denuded areas, install and
maintain te:mporary erosion controls (such
as erosion control fabric or bonded fiber
matrix) until vegetation is established.
Remove existing vegetation only when
absolutely necessary, and seed or plant
vegetation :for erosion control on slopes
or where construction is not immediately
planned.
D Prevent sediment from migrating offsite
and protect storm drain inlets, gutters, ditches, and drainage courses by installing and maintaining appropriate BMPs, such as fiber rollls, silt fences, sediment basins, gravel bags, berms, etc.
D Keep excavated soil on site and transfer iit
to dump trucks on site, not in the streets.
Contaminated Soils
If any of the following conditions are
observed, test for contamination and
contact the Regional Water Quality
Control Board:
Unusual soil conditions, discoloration,
or odor.
Abandoned underground tanks. Abandoned wells
Buried barrels, debris, or trash.
Paving/ Asphalt Work
Avoid paving and seal coating in wet weather or when rain is forecast, to prevent materials that have not cured
from contacting stormwater runoff.
Cover storm drain inlets and manholes
when applying seal coat, tack coat, slurry
seal, fog seal, etc.
Collect and recycle or appropriately
dispose of excess abrasive gravel or sand.
Do NOT sweep or wash it into gutters.
Do not use water to wash down fresh
asphalt concrete pavement.
Sawcutting & Asphalt/Concrete Removal
Protect nearby stonn drain inlets when
saw cutting. Use filter fabric, catch basin
inlet filters, or gravel bags to keep slurry
out of the storm drain system.
Shovel, abosorb, or vacuum saw-cut
slurry and dispose of all waste as soon
as you are finished in one location or at
the end of each work day (whichever is
sooner!).
D If sawcut slurry enters a catch basin, clean
it up immediately.
c:oncrete, Grout & Mortar
Application
Store concrete, grout, and mortar away
from storm drains or waterways, and on
pallets under cover to protect them from
rain, runoff, and wind.
Wash out concrete equipmen1Jtrucks
offsite or in a designated washout
area, where the water will flow into a
temporary waste pit, and in a manner
that will prevent leaching into the
underlying soil or onto surrmmding areas.
Let concrete harden and dispose of as
garbage.
When washing exposed aggregate,
prevent washwater from entering storm
drains. Block any inlets and vacuum
gutters, hose washwater onto dirt areas, or
drain onto a bermed surface to be pumped
and disposed of properly.
Protect stockpiled landscaping materials
from wind and rain by storing them under
tarps all year-round.
Stack bagged material on palllets and
under cover.
Discontinue application of any erodible
landscape material within 2 days before a
forecast rain event or during wet weather.
Stor drain pol luters ma be liable or fines o up to $10 000 per d II Painting & Paint Removal
Painting Cleanup and Removal
Never clean brushes or rinse paint
containers into a street, gutter, storm
drain, or stream.
D For water-based paints, paint out brushes
to the extent possible, and rinse into a
drain that goes to the sanitary sewer.
Never pour paint down a storm drain.
D For oil-based paints, paint out brushes to
the extent possible and clean with thinner
or solvent in a proper container. Filter and
reuse thinners and solvents. Dispose of
excess liquids as hazardous waste.
D Paint chips and dust from non-hazardous
dry stripping and sand blasting may be
swept up or collected in plastic drop
cloths and disposed of as trash.
Chemical paint stripping residue and chips
and dust from marine paints or paints
containing lead, mercury, or tributyltin
must be disposed of as hazardous waste.
Lead based paint removal requires a statecertified contractor.
Dewatering
Discharges of groundwater or captured
runoff from dewatering operations must
be properly managed and disposed. When
possible send dewatering discharge to
landscaped area or sanitary sewer. If
discharging to the sanitary sewer call your
local wastewater treatment plant.
D Divert run-on water from offsite away
from all disturbed areas.
D When dewatering, notify and obtain
approval from the local municipality
before discharging water to a street gutter
or storm drain. Filtration or diversion
through a basin, tank, or sediment trap
may be required.
D In areas of known or suspected
contamination, call your local agency to
determine whether the ground water must
be tested. Pumped groundwater may need
to be collected and hauled off-site for treatment and proper disposal.
I SIEGEL & STR
AIN Architects I
Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA TERRACE
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date adjust to date plotted PLANNING REV. 1 11/15/19 PLANNING REV. 2 7/14/20 C-9.0 FIRE ACCESS PLAN 1"=40' PLANNING REV. 3 11/10/20 NIJ'07'01"E J50.00' __ -<<:::::::::._:.._~=N0'55'09"W 20.61' I I 18,436-SQFT-/- -- OED/CA TED AREA ALPINE ROAD N1J'07'01"E 906.76' ---- ---- /
/ / S6rJO'OO"E 72.68'
PROPOSED ROW
100·
LEGEND
--------
PROPOSED RRE HYDRANT
BACKFLOW PREVENTER
SCALE: 1"=40'
RRE ACCESS ROUTE (STRIPING ANO SIGNAGE llfl1. BE
PRO'AOED PER WOOOSIO£ RRE'S STANDARDS TO
ENSURE NO PARKING ALONG TH£ £VA£)
811/LDING FAC£ llfTHIN 150' OF
RR£ ACCESS LAN£
FUEL MANAGEMENT AREA MAINTAIN£0
BY HOM£ O11f(£R'S ASSOC/A TION
PR/VA TE FUEL
MANAGEMENT AREA
N2'49'10"E 111.88''---~
I SIEGEL & STRAIN Architects
Property Line Break line Align
P L Blow-up Slope Indicators Detail Callouts Elevation Center Line Section Cuts Setback Line L4.07L4.07 L4.07 List of Standard Abbreviations BLDG: Building BW: Bottom of Wall BS: Bottom of Stair CB: Catch Basin CJ: Control Joint CL: Centerline CLR: Clear CMU: Concrete Masonry Unit CONC: Concrete DEMO: Demolition DIAM: Diameter DIM: Dimension DTL: Detail DWGS: Drawings DS: Downspout EA: Each EJ: Expansion Joint EQ: Equal EQUIP: Equipment (E): Existing FFE: Finish Floor Elevation FG: Finish Grade FS: Finish Surface FT: Foot, Feet HB: Hose Bib LA: Landscape Architect MAX: Maximum MFR: Manufacture, Manufacturer MIN: Minimum MISC: Miscellaneous (N): New NIC: Not In Contract NTS: Not To Scale OC: On Center PA: Planting Area PGR: Per Geotechnical Report PL: Property Line QTY: Quantity R: Radius SAD: See Architect’s Drawings SCD: See Civil Engineer’s Drawings SSD: See Structural Engineer’s Drawings M/F SCHED: Materials and Finishes Schedule SIM: Similar SF: Square Foot SPEC, SPECS: Specification, Specifications TC: Top of Curb TS: Top of Stair TW: Top of Wall TYP: Typical W/: With W/O: Without WWM: Welded Wire mesh Project Team Landscape Architect: Ron Lutsko Jr. and Andrea Kovol Lutsko Associates Landscape 3295 Mission Street San Francisco, CA 94110 phone #415-920-2800 Architect: Larry Strain and Nancy Malone Siegel and Strain 6201 Doyle Street Suite B Emeryville, CA 94608 phone #510.547.8092 Civil Engineer: Nate Dickinson and Steven Yasutake Sandis 1700 S. Winchester Blvd, Suite 200 Campbell, CA 95008 phone #408.636.0962 Stanford University Portola Terrace 11/10/2020 Alpine Rd, Portola Valley, CA 94028 Location Map Sheet Index L0.0 Title Sheet L1.1 Site Plan L2.1 Site Details and Elevations L3.1 Planting Plan and Schedule L4.1 Irrigation Plan L4.2 Irrigation Plan L4.3 Irrigation Plan L4.4 Irrigation Notes and Legend L4.5 Irrigation Details L4.6 Irrigation Details L4.7 Irrigation Details L4.8 Irrigation Worksheets L5.1 Lighting Plan L5.2 Lighting Details Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Consultant: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA VALLEY FACULTY HOUSING
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date 11.10.2020 3295 Mission Street San Francisco, CA 94110 TEL 415 / 920-2800 [email protected] LUTSKO ASSOCIATES l a n d s c a p e O Date Renewal Date Signature
RNIA
O
F
CALIF
T TA S
E PLANNING REV. 1 11/15/19 PLANNING REV. 2 07/14/20 L0.0 Title Sheet Abbreviations and Symbols I 7 --+-i eJ ----- I SIEGEL & STRAIN Architects I
ALPINE ROAD PA PA PA PA PA PA PA PA PA PAPA PA Deer Fence Retaining Walls Split Rail Fence Asphalt Driveways, SCD (6) Bike Parking (6) Bike Parking L2.16 L2.15L2.12 L2.16 L2.13 Spinner Plate L2.17 Swingset L2.18 Climbing Structure L2.19 PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA Typical Lot Blow Up 25' Fuel Management Area
Management Area, 200' MIN Fuel by Home Owner's Association, see C-9.0 75' Fuel
Management
Area 25' Private Fuel Management Area, see C-9.0 PA PA PA PA PA PA PA PA PA PA PA PAPA PA L2.14 Existing Trees Screening Trees Retention Basin Stormwater Bioretention Areas 1 2
3 4
5 6
7 8
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 BMR 1 26 27 BMR 2 BMR 3 Play Surface TYPE: Fibar® engineered wood fiber installed per mfr. instructions. SUPPLIER: Fibar Playground Surfaces; www.fibar.com MATERIALS & FINISHES SCHEDULE: Concrete Walls at Play Area Seatwall 18" wide, max height 18". Retaining wall 8" wide, max height 28". TYPE: Poured in Place Walls COLOR: Davis Integral Color, 'Sierra' SUPPLIER: Davis Colors, www.daviscolors.com FINISH: Smooth finish PA Planting Area, See Planting Plan Retaining Wall TYPE: Keystone Stonegate Contemporary Wall SUPPLIER: Keystone Retaining Wall Systems; www.keystonewalls.com Alternate: Redwood SITE ELEMENTS: Picnic Table TYPE: 6' x 3' wood picnic tables with matching benches COLOR: Redwood FINISH:TBD MFR:TBD 4 qty Concrete Patios and Entry Walkways TYPE: Poured-in-place COLOR: Natural FINISH: Broom finish JOINTS: Saw-cut joints Fieldstone Paving w/ Mortar Joints at Play Area TYPE: Bluestone/brown color range FINISH: Flamed PATTERN: Irregular SIZE: Varies (N) Deer Fence POSTS: 6" x 6" redwood, construction heart grade METAL MESH: Welded wire mesh: plain steel, 12 gauge w/ 3" openings POST FINISH: saw-textured Swingset TYPE: Robinia Swing Frame for 3 Seats NRO923-0901 COLOR/FINISH: Natural MFR: MFR: Kompan US; www.kompan.us.com Climbing Structure TYPE: Robinia Climbing PARCOUR 002 COLOR/FINISH: Natural MFR: Kompan US; www.kompan.us.com Spinner Plate TYPE: Robinia Spinner Plate NRO110 COLOR/FINISH: Surface MFR: Kompan US; www.kompan.us.com (N) Split Rail Fence POSTS: 6" x 6" redwood, construction heart grade FINISH BOARDS: 2" x 6" redwood boards, construction heart grade FINISH: saw-textured 1 qty 1 qty 2 qty Crushed Stone Paving at Side Yard Pathways TYPE: 1/4" minus crushed 'Yosemite Tan' aggregate with stabilizer. STABILIZER: By Stabilizer Solutions www.stabilizersolutions.com, install per mfr. instructions Bike Parking TYPE: Stainless Steel Circular Bike Rack, R-8224-EM-SS COLOR/FINISH: Stainless Steel MFR: Reliance Foundry; www.reliance-foundry.com 12 qty PA PA LEGEND:25' Private Fuel Mitigation Zone, see C-9.0 200' Min. Fuel Management Area by Homeowner's Association, see C-9.0 0 1 inch = ft. 40 40 80 120 Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Consultant: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA VALLEY FACULTY HOUSING
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date 11.10.2020 3295 Mission Street San Francisco, CA 94110 TEL 415 / 920-2800 [email protected] LUTSKO ASSOCIATES l a n d s c a p e O Date Renewal Date Signature
RNIA
O
F
CALIF
T TA S
E PLANNING REV. 1 11/15/19 PLANNING REV. 2 07/14/20 L1.1 Material and Finishes Plan1" = 40'-0" TYPICAL LOT BLOW-UP PLAN SCALE: 1"=20'-0" Concrete Patio, TYP Concrete walk, TYP Crushed Stone Pathway, TYP 7 8 Private yard gate, TYP Deer Fence, TYP Retaining wall, TYP Asphalt driveways, TYP / ·, I /~ V ', \~ r--- . ' . \, v -
.I\
II Ill ,.\ ,l r' 11 I " c' {
,,
\ /
"" ,'F' {~:r- i\ s j/\ ' I 11 /' t ' ·--'· I\~ r ' -~ '· ·• ' cc ·./ I ·> ' ' "'· :-·· ·., • ' • :.-/ .): ,, •• I I' -t.'. .' ' !.: ' ...• :J:{{. ' .,,. 17 11!/ I ·>.-·
-
' ll,,.
' I '
J )( ' '
V \, I
-----.../
// /
\
/ /
/ /
- -
""
/
\ \
/ I /
\ ___ +-
/
/
\
\--t---+)- --i--
\ \
1/
I
I
\
I I I
'\ \~ \
-j ---,- ,/-----i
/ I I
\
/
,-7
L_...J
\
7 1---1--/-
/
[:]
i :'.itXfr'.'.1
I SIEGEL & STRAIN Architects I
CJ
HJ
[OJ
3'-0"
2" max.
6'-0" Gate handle 2x4 Redwood frameDeer Fence L2.12
EQ EQ
3'-6", slope rails parallel with grade
8"
1 1/4" typ 1 1/2" typ
2 1/2"
typ ±6'-0" MAX. span Wooden post - 6 x 6 Redwood Wooden rail - 2 x 6 x 13'-6" max, redwood rails to span two posts, alternate upper and lower rail ends at each post Stainless steel self-driving screws TYP. Finished grade Angle top 5% to shed water 6'-0" +/- 6'-0" MAX. span
1" 6x6 redwood post, TYP. Welded wire mesh: plain steel, w/ 3" openings Finish Grade Concrete footing 8" Min. Low Permeable Soil Keystone Stonegate Cap Unit Secured with Kapseal Adhesive or equal Keystone Country Manor Unit Retained Soil Unit Drainage Fill (3/4" Crushed Rock or Stone) 4" Perforated PVC Drainage Tile Wrapped in Filter Fabric (If Required) Approximate Limits of Excavation Finished Grade Unreinforced Concrete or Crushed Stone Leveling Pad 1" - 1 1/4" 6" 24" Foundation Soil 22" 4'-0" MAX. Deer Fence
4'-0" MAX. Finish Grade ELEVATION SECTION
4'-0" MAX.
4'-0" MAX.
4'-0" MAX.
1 9
3 7
4 Kompan Robinia Parkour 002 SCALE: 3/8" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: NTS SCALE: NTS Kompan Robinia Spinner Plate Keystone Retaining Wall @ BMR Split Rail Fence 2 Deer Fence - Private Yard Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Consultant: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA VALLEY FACULTY HOUSING
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date 11.10.2020 3295 Mission Street San Francisco, CA 94110 TEL 415 / 920-2800 [email protected] LUTSKO ASSOCIATES l a n d s c a p e O Date Renewal Date Signature
RNIA
O
F
CALIF
T TA S
E PLANNING REV. 1 11/15/19 PLANNING REV. 2 07/14/20 SCALE: 1 2" = 1'-0"
8 Kompan Robinia Swingset SCALE: NTS L2.1 Site Details
5 Keystone Retaining Wall Section TYP. NTS
6 Steel Ring Bike Rack SCALE: NTS as noted SCALE: 3
4 Gate - Private Yard " = 1'-0" 22''51' [684cm] ,,d
;~ ij " £' el f • r
~ ] ,~,-
l'l'!Ol!:;2-1001
'1:'.100
NR092l
1:1DO
,---I ·
• ·~
I
,, ,
~-- l..\
I
INRU1.1/J'll001
moo
'll -
'
,. ..
;fl I
:JS'-1.· rto6Bcml
* = Highest designated play surface.
**=Tota l height of product.
I
I
* = Highest designated play surface.
"" = Total height of product.
'
, •
I
,, ' .
a
I
' I
.,
I
,
~-
/
'1
j
'
'
,
I
>------351/2-----<
..--16----1
of----------
1 -11-11-111-111-III-I 1-
, 1-1 -I
I -I
I 7
I I_J I_J lul lul lwl I lwl 1 ,w, 1 IL 1- ,-, '
. . .
I
11 1 ' i ' '===~~ -------'le
11-11
11 11 111 1-~· 11 1 I I I I I ---r11 -">!·'0""'7'-',
1111111111
11-1-1- i' I I II I ll=11st<·,,r'"7'!\
I;' I I II I 11 ;'
ii' 111 11 11 ;' / =11 II
I i' 1,1 1, 11,1 11111 11 l=I l=I I 11111 I-~
, I 1,1 1, 11,1 11111 iii I II I 1111 Ill II I .,'r7"7"1 --=11= 11=11=11 =I= I =11 =111
-I ,; 1111 1111 11,1 1,1 Ill 11111 II I
'-=I 1=111=1 l=I I= 11= 11 ---=11=1=1=11=111=1 I
-111 I 1111 Ill 11111 Ill I
'----=q I 11 1 II 11 1 I 111 ~-·1r---,-;,1; 1 l=ll I I 111 11---;;Jlll I 11_1_ - - _I_ ,1 1,
' ---= I = I =1 1=1 I =1 1=1
'I II_ I_ II
0 0
0 0 0 0
0 0 0 0
[ ------'------'---------'-----'-----------'-------'---- ,
.
--r,._
--------
\ ----
--
. .
' '
'
. .
.
'
I I I I I I I I I I I
+ - + - + + + + + + + - + - + + + + - -
- + + + + - + - - + - + + + + - + - + +
I I I I I I I I I I I I I I
I I I I I I I I I I I
+ - + - + + + + + + + - + - + + + + - -
- + + + + - + - - + - + + + + - +
I I I I I I I I
. - + + + + -
(' ,---n ' { . / I/ /
/ '
/
/ / I/ ;
/
I/
/
/ /
/
/
/
/
/
/
V
/
/
V
•
(\
\J
I SIEGEL & STRAIN Architects I
09-30-22
11-11-19
0' SCALE: 1" = 80'-0" Typical Lot Blow Up L3.21 South Entry Blow Up L3.2 2 North Entry Blow Up L3.2 3 25' Fuel Management Area
Management Area, 200' MIN Fuel by Home Owner's Association, see C-9.0 25' Private Fuel Management Area, see C-9.0 75' Fuel
Management
Area
1 2
3 4
5 6
7 8
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 BMR 1 26 27 BMR 2 BMR 3 10'-0" 445'-0"
10'-0" 385'-0" 385'-0" 445'-0" Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Consultant: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA VALLEY FACULTY HOUSING
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date 11.10.2020 3295 Mission Street San Francisco, CA 94110 TEL 415 / 920-2800 [email protected] LUTSKO ASSOCIATES l a n d s c a p e O Date Renewal Date Signature
RNIA
O
F
CALIF
T TA S
E PLANNING REV. 1 11/15/19 PLANNING REV. 2 07/14/20
0 1 inch = ft. 40 GRAPHIC SCALE 40 80 120 PLANTING SCHEDULE L3.1 Planting Plan LEGEND 1" = 40'-0" Existing Trees 55 TOTAL 1. All planting to be approved by WFPD. 2. See VMP page1-8. 3. Landscape and Civil have coordinated with utilities. 4. Contractor to consult Landscape Architect before construction to review small (E) oaks for relocation to scenic corridor. 25' Private Fuel Mitigation Zone, see C-9.0 NOTES: ------- 1///////// __ / / .' > '/ L ____________ _ / / % / __ -- .... · -·.
, , , . 1/ •
. - /
,., ,/ , ,
--· /
.--·
-~---;-
/ / /
/ / / '
/ /,
/ .
/
-; ----+--
\
\
' / ,' / ..
. ',/ -· '
/
'
"
\
\
. \
//
I
0 +
7,938 sf
4,915 sf
43,083 sf
28,600 sf
Sym I Botanical Name
New Trees
AC Aescu/us ca/ifornica
QA Quercus agrifolia
QL Quercus lobata
Sym !Botanical Name
Screening Shrubs
Arctostaphy/os regis 'Montana'
Ganya elliptica 'E~e·
Rhamnus crocea
Rhus integrifolia
Bioretention Areas
Achillea millefolium
Juncus patens
Leymus triticoides
Entry Planting Area
Sti pa pulchra
Common Open Areas
Achillea millefolium
Arctostaphylos uva-ursi
Arctostaphylos 'Pacific Mist'
Epilobium 'Wayne's Sil1.e(
Eriogonum grande var rubescens
Festuca california
Iris douglasiana
Muhlenberg/a rigens Sa/via 'Bee's Bliss' Sa/via 'Pozo Blue' Salvia spathacea Stipa pulchra
Private Gardens
Arctostaphylos uva-ursi
Arctostaphylos 'Pacific Mist'
Epilobium 'Wayne's Sil1.e(
Erigeron glaucus 'Wayne Roderick' Eriogonum grande var rubescens Festuca california
Heuchera maxima
Iris douglasiana
Muhlenberg/a rigens Sa/via 'Bee's Bliss' Sa/via 'Pozo Blue' Sa/via spathacea Private Lawns
)common Name
California Buckeye
Coast Li1.e Oak
Valley Oak
!common Name
Manzanita
Coast silktassel
Spiny Redberry
Lemonade Berry
Yarrow
California Grey Rush Creeping Wild Rye
Purple Needlegrass
Yarrow
Bearberry Manzanita
California fushchia
Red Buckwheat
California fescue
Douglas iris
Deer Grass
Bee's Bliss Sage
Grey Musk Sage
Hummingbird sage
Purple Needlegrass
Little Sur manzanita Manzanita
California fushchia
Wayne Roderick Daisy
Red Buckwheat
California fescue
Island Alum Root
Douglas iris Deer Grass
Bee's Bliss Sage
Grey Musk Sage
Hummingbird Sage
I
5,355 sf Bolero Plus, available from Delta Bluegrass
~
~ -'"~·"-'-·'' ' ·-c:
'f±--<>,--,--FP~~ ----
I I
7 "
\.
_,--~-
/
/ /x / ' ?/' ,.,/ ' / ,;/
/ -·/ //•/-;///,-/ '/ , ~)\~~~:#1: :f:~?-f:£~, /'
/
/ X ,, ?:: / 1//4/
-· . pf///~
/
/ -'l/
/ 1//2 ./ /
//
/ - "
_/ ____ _
L
________________ _
1-
_ _J
Qty Size Spacing
11 36" Box 30 'oc
34 36" Box 35 'oc
10 36" Box 35 'oc
Qty Size Spacing %
88 5 Gal. 96 II Q(
49 5 Gal. 96 II Q(
109 5 Gal. 60 "QC
64 5 Gal. 96 "QC
242 plug 24 "QC 10%
994 plug 24 II Q( 50% 984 plug 24 "QC 40%
1490 plugs 24 "QC 100%
215 1 Gal. 24 II Q( 2%
345 1 Gal.
162 1 Gal.
60 "QC 20%
72 II Q( 15% I SIEGEL & STRAIN Architects
323 1 Gal. 24 "QC 3% 323 1 Gal. 24 "QC 3%
1292 plug 24 "QC 12%
323 1 Gal. 24 "QC 3% 388 1 Gal. 48 II Q( 15% 310 1 Gal. 48 II QC 12% 172 1 Gal. 42 "QC 5%
237 1 Gal. 36 "QC 5%
948 plug 18 "QC 5%
229 1 Gal. 60 II QC 20%
107 1 Gal. 72 11 0c 15%
215 1 Gal. 24 II Q( 3%
137 1 Gal. 30 II Q( 3%
215 1 Gal. 24 "QC 3% 215 1 Gal. 24 II Q( 3% 215 1 Gal. 24 II QC 3% 286 1 Gal. 24 "QC 4% 257 1 Gal. 48 11 0c 15% 09-30-22 11-11-19
206 1 Gal. 48"oc 12% 206 1 Gal. 48"oc 12%
120 1 Gal. 48 II QC 7%
SP EG SB SP SP SP SP AU AU SP SP EGEG ew EG SP SPSP SP
F SSSS SSSSSSSS
F
F
F
F
F
F
F
F
F
F
F SSSS SSSSSS
F
FF
F
F
F ewewew ew IDID ID ID ID ew ewew SBSB SB ew AUID ID AP AP AP AP SB SB SB SB SB SB F
FFF
F
FFIDID ID ew EGEGEGEG ew ewew ewewewewew ID ID ID ID
F
FF
FF
F
F
F
F ID ID IDIDID IDID SSSS SSSS
F
F
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S EG EG
F EG EG
FF
F
F
F
F
F
F
F AU
S
S
S
S AUAUAU SP SP AU AU AU
F
F
F
F
S
S
S
F
F
F
F
F
F
F
F
F
F
F
F
F
F SPewewEG EG EG ew ew
F
7 S
S
S
SS
S
SS
S
S
SS
SS
SS
SS
S
S
SS
SS
S
SS
S
SS
SS
SS
SS
SS
S
SSS
SSSS
S
SSSSSSSSSSSSSSS
S
SS
SSSS
S
S
S
SSSSSSS
SSSSSSS
S
S
SSSSSSSSSSSS
S
SSSSSSSSSSS
SS
S
S
S
S
S
S
S S
S
S
S
S
SSSS
SSSS
SSSS
S
SSSS
SSSS
SSSS
SSS
S
SSSS
S S S S S S S S S S S S S S S S
SS
SS
S
S
SS
SSS
S
S
SS
SS
SSS
SS
SS
SS
SSS
SS
SS
S
S
S
S S S S S S S S S S S S S S S S
SS
SS
SS
S
SS
S
SS
SS
S
SS
SSS
SS
S
S
SS
S
S
SSS
S
S S S S S S S S S S S S S S SS S S S S S S S S S
S
S
SS
SS
S
SS
S
S
S
S
SS
S
SS
S
S
S
S
S
SS
S
SS
S
SS
SSS
S
SS
S
SS
SS
S
S
SS
SS
S S S S
S S S S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
SS
S
S
S
SS
SS
S
S
S
S
S
S
S
S
S
SS
SS
S
S
S
SS
S
SS
S
S
S
SS
SS
S
S
SS
S
SS
S
S
S
SS
S
S
S
SS
S
SS
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S S S S S S S S S S S S S S S S S S
S S S S S S S S S S S S S
S
S
S S S S S S S S S S S S S S S S S S S S
S
S S S S S S S S S S S S S S S S S S
S
S
S
S
S S S S S S S S S S S S S S S S S S S SS S S S S S S S S S S S S S S S S S S S
S S S S S S S S S S S S S S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S S S S S S S S S S S S S S S S S S S
S
S
SS
SS
SS
SS
SS
S
S
S
SS
SS
S
SS
S
S
S
S
S
SS
SS
S
S
SS
S
S
S
S
S
SS
SS
S
SS
SS
SS
S
SSSSSSS
S
SS
SS
S
S
SS
S
S
S
S
S
SSSSSSS
S
SS
SS
S
S
SS
S
S
S
S
S
SS
SSSSS
S
S
SS
SS
SS
SS
SS
S
S
SS
SSSS
S
S
SS
SS
SS
SS
SS
S
S
SSSSS
S
SS
SS
S
S
SS
S
S
S
S
S
S
S
S
SS
S
S
SS
SS
S
SS
S
S
S
S
S
S
S
S
SS
SS
S
SS
SS
SS
S
SS
SS
SS
S
SS
SS
S
S
S
S
S
SS
SS
S
SS
SS
S
S
S
S
SS
S
S
SS
S
S
S
S
S
S
SS
SS
S
S
S
S
S
SS
S
S
S
S
S
S
S
S
SS
S
SS
SS
S
SS
S
S S S S S S S S S S
S S
S S
S S
S S S
S S S S S S S S S S S S S S S S S S S
S S S S S S S S S S S S S S S S S S S
S
S
S
S
S
S
S S S S S S S S S S S S S S
S S S S S
S S S S S S S S S S S S S S S S S
S
S
S
S
S
S
S
S
S S S S
S
SS
SSSS
S
S
S
10'-0" 385'-0" 445'-0"
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
JJ
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
JJ
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J J
J
J
J J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J J
J
J
J
J
J
J
J
J
J J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J J
J
J
J
J J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J J
J
J
J
J
J
J
J
J
J
J
J
J J J J
J
J
J
J
J
J J J J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J J
J
J
J
J
J
J
J
J
J
J
J
J J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l l
l
l
l
l
l
l l
l
l l
l
l
l l l
l
l
l
l
l
l
l
l l
l
l
l
l
l
l
l
l
l
l l l
l
l l l
l l l
l l
l
l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l l
l
l
l
l
l
l
l l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l l l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l a
a
a
a
a a
a
a
a
a
a
a
a
a
a a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a a a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a a
a
a
a
a
a
a
a a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
S
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
S
SSS S
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
S
SS S
S
S
S
SS
S
S
S S
S
S
S
SS
S
SS S
S
S
S
SS
S
S
S S
S
S
S
S
S
S
SS S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SSSS S S S S S S S S S S S
S
S
S
S
S
S
S
S S S
S S S S S S SS S S S S
S
S S S S
S S S
S
S S S S S S S S S S S S S S S S
S
S
S
S
S S S S S S S S S S
S
S
S
S
S
S
S S S S S S S S S S S S S
S S S S S S S S S S S S
S S S S S S S S S S S
S S S S S S S S S
S
S
SS
SSS
SSS
S
S
S
S
S S S S S S S S S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SSSS
SSS
S
S
S
S
SSS
SSS
SSSSS
SS
SSS
SSS
SS
SSS
SSS
SSS
SS
SS
SS
SS
S
S
SS
S
SS
S
S
SS
S
S
SS
S
S
S
S
SSS
S
S
S
S
S
S
S
S
S S
S
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a a
a
a
a
a
a
a
a
a a
a a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l l l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l J
J J
J
J
J
J
J
J
J
J
J
J
J
J J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J J J J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a a
a
a
a
a
a a
a
a
a
a
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
J
J
J
J J
J J
J
J
J
l
l
l a
a
a
a
a
a
a
a
a
a
a
a
a a
a
a
a
a
a
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l l
l
l
l
l
l
l
l
l
l
l
l
l
l
J
J
J
J
J
J
J J J
J J
J
J
J
J
J
J
J J J
J
l J
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l l
l
l
l J
J
J
J J J
J
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
J J
J J
J J
J J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
l
l
l l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
a
a a
a a
a a
a
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
J
J
J
J
J
J
J
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
J
J
J
J
J J
J
J
J
J
J
J
J
J
J J
J J
J
J J
J
J J
J J
J
J
J
JJ
J
J J J J
J
J
J J
J
J J
J
J
J J
J
J
J
J J
J
J
J
J
J
J
J
J
J
l
J
J
l
l
l
l
l
l
l
10'-0" 385'-0" 445'-0" Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Consultant: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA VALLEY FACULTY HOUSING
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date 11.10.2020 3295 Mission Street San Francisco, CA 94110 TEL 415 / 920-2800 [email protected] LUTSKO ASSOCIATES l a n d s c a p e O Date Renewal Date Signature
RNIA
O
F
CALIF
T TA S
E PLANNING REV. 1 11/15/19 PLANNING REV. 2 07/14/20 TYPICAL ENTRY PLANTING SCHEDULE L3.2 Planting Blow-Up Plan AS NOTED NORTH ENTRY BLOW-UP PLAN SCALE: 1"=20'-0" Juncus patens Planting Concept -3 SOUTH ENTRY BLOW-UP PLAN SCALE: 1"=20'-0"
-2 TYPICAL LOT BLOW-UP PLAN SCALE: 1"=10'-0"
-1 BIORETENTION PLANT PALETTE SCALE: NTS
-4 TYPICAL PRIVATE GARDEN SCHEDULE
S
a
JL AUEWEG
FSPSS NOTE: See L3.1 for tree types and quantities, TYP. Private Garden Common Open Area 25' Private Fuel Management Area, see C-9.0 Private Garden VS. Common Open Area AUAP EWEG FIDSB
S NOTE: See L3.1 for tree types and quantities. Sight triangle, TYP - Area to remain clear Sight triangle, TYP - Area to remain clear Achillea millefolium Leymus triticoides All planting within sight triangles to be <3'-0" in height 15'-0" 35'-0"
15'-0" 35'-0" PLANNING REV. 3 11/10/20 \ \ \ \ \ \
\
\
Sym
0 !Botanical Name
Screening Shrubs
Arctostaphylos regis 'Montana'
Ganya el/iptica 'Elie'
Rhamnus crocea
Rhus integtifolia
Bioretention Areas
Achillea millefolium
Juncus patens
Leymus triticoides
Entry Planting Area
Stipa pulchra
_)
I
I
J
!common Name
I Qty Size Spacing %
Manzanita 29 5 Gal. 96 "oc
Coast silktassel 9 5 Gal. 96 "oc
Spiny Redberry 34 5 Gal. 60 "oc
Lemonade Berry 18 5 Gal. 96 II QC
Yarrow 242 plug 24 "oc 10%
California Grey Rush 994 plug 24 "oc 50%
Creeping Wild Rye 984 plug 24 "oc 40%
Purple Needlegrass 1490 plug 24 "oc 100%
-c---"
'---------4_L__--r-c"---'=='---===-7 19 I j I
i7
.J,,,,,,i.. ,,,.uc1=====
0 Sym !Botanical Name !common Name Qty Size Spacing
Screening Shrubs
0 Ganya elliptica 'Ellie' Coast silktassel 2 5 Gal. 96 "oc © Rhamnus crocea Spiny Redberry 5 Gal. 60 "oc
Private Gardens
Arctostaphylos uva-ursi Little Sur manzanita 9 1 Gal. 60 "oc Epilobium 'Wayne's Silver California fushchia 5 1 Gal. 24 "oc Erigeron glaucus 'Wayne Roderick' Wayne Roderick Daisy 11 1 Gal. 30 "oc Festuca califomia California fescue 57 1 Gal. 24 "oc Salvia 'Pozo Blue' Grey Musk Sage 14 1 Gal. 48 "oc
Sa/vi a spathacea Hummingrbid Sage 15 1 Gal. 48 "oc
Common Open Area
Arctostaphylos uva-ursi Little Sur manzanita 1 Gal. 60 "oc Arctostaphylos 'Pacific Mist' Manzanita 4 1 Gal. 72 "oc Epilobium 'Wayne's Silver California fushchia 17 1 Gal. 24 "oc Erigeron glaucus 'Wayne Roderick' Wayne Roderick Daisy 4 1 Gal. 30 "oc Festuca califomia California fescue 7 1 Gal. 24 "oc Iris douglasiana Douglas iris 21 1 Gal. 24 "oc
Salvia 'Bee's Bliss' Bee's Bliss Sage 10 1 Gal. 48 "oc Stipa pulchra Purple Needlegrass 49 plug 24 "oc Private Lawn I
200 sf Bolero Plus, available from Delta Bluegrass
f-=-=-=-=-=~ I SIEGEL & STRA IN Architects I
....._
....._
09-30-22
11-11-19
iiilllll
1
ALPINE RD
355
360
365
370
375
+ TW 347.5
+ TW 347.5
+ TW 347.5
+346.0
+345.0
347
346
346
1 2
3 4
5 6
7 8
9 10 25 26 27
1 2
3 4
5 6
7 R
R
R
R
R
R
R
R
R
R
R
R
8 910 Project ID: Plot Date: Drawn by: Checked by:
Project Title:
Design Firm: Consultant: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA VALLEY FACULTY HOUSING
STANFORD UNIVERSITY
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date
07.1 4.2020 3295 Mission Street San Francisco, CA 94110 TEL 415 / 920-2800 [email protected] LUTSKO ASSOCIATES l a n d s c a p e O Date Renewal Date
Signature
RNIA
O
F
CALIF
T TA S
E PLANNING REV. 1 11/15/19 PLANNING REV. 2 07/14/20 IRRIGATION PLAN L4.1 -WMJL
SHEET L4.2
SHEET L4.31" = 20'-0" C-1
4 2.330 1"C-22.4 .9530 1" 4" SL. 6" SL. PLEASANTON, CALIFORNIA 94566 IRRIGATION CONSULTANTS 480 ST. JOHN STREET, SUITE 220 E-MAIL [email protected] TEL 925.855.0417 FAX 925.855.0357 C-316 .6430 1" C-414 .6430 1" C-5 2 2.2930 1"C-619 .6430 1"C-71 2.2830 1" C-8 .64 1" 14 30 C-36 .64 1" 19 30 C-37 2.31 1" 1 30 C-38 .64 1" 10 30 C-39 .64 1" 17 30 C-40 2.28 1" 1 30 C-41 2.31 1" 1 30 C-42 .64 1" 15 30 C-43 .64 1" 14 30 C-44 .95 1" 4 30 6" SL.
6" SL. 6" SL. 6" SL. 6" SL. 6" SL. 4" SL. 4" SL. 4" SL. 4" SL. 4" SL. 4" SL. 4" SL. 4" SL. 4" SL. 4" SL.
4" SL.
4" SL.
6" SL.
6" SL.
6" SL.
6" SL.
6" SL.
6" SL.
6" SL.
6" SL. 2" 2" 2" 2" 2" 2" 2" 2" ASCC SUBMITTAL
11/10/2020
O Date Renewal Date Signature
RNIA
O
F
CALIF
T TA S
E / ~ORE G) G) 0
/
I I I
'-l./ 1/
/
/
/
/
/
/
..
/
/
I
N"= ---~oi:ii-=-=-=---_-_
·
__ /
U)
...
BROOKWATER
SIEGEL & STRAIN Architects
_-_- - - - - - - - - - - - - - - - -------CEOHE I.
CMN I
------
I _-_-_-_-_-_-_-_-_-
C N CMN
- ~ '{:: f -- '_ -------
/ / d'' t"" --------=----------=---~-----"------
U) ·-
340
350
335
+ TW 347.5
+ TW 347.5
+ TW 347.5
+346.0
+345.0
348
347
346
346
8 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26
3 4
5 6
7 111213141516
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R 171819
8 910 Project ID: Plot Date: Drawn by: Checked by:
Project Title:
Design Firm: Consultant: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA VALLEY FACULTY HOUSING
STANFORD UNIVERSITY
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date
07.1 4.2020 3295 Mission Street San Francisco, CA 94110 TEL 415 / 920-2800 [email protected] LUTSKO ASSOCIATES l a n d s c a p e O Date Renewal Date
Signature
RNIA
O
F
CALIF
T TA S
E PLANNING REV. 1 11/15/19 PLANNING REV. 2 07/14/20 IRRIGATION PLAN L4.2 -WMJL
SHEET L4.1
SHEET L4.3 1" = 20'-0" C-914 .6430 1" C-10 2.22 1" .5 30 C-11 .64 1" 16 30 6" SL. 4" SL.
PLEASANTON, CALIFORNIA 94566 IRRIGATION CONSULTANTS 480 ST. JOHN STREET, SUITE 220 E-MAIL [email protected] TEL 925.855.0417 FAX 925.855.0357 C-12 2.31 1" 2 30 C-13 .64 1" 18 30 C-14 .64 1" 10 30 C-29.5 2.2230 1"C-3013 .6430 1"C-3114 .6430 1" C-34 2.29 1" 2 30 C-33 .64 1" 16 30 C-32 .64 1" 10 30 C-3511 .6430 1" 4" SL.
4" SL.
4" SL. 6" SL. 6" SL. 6" SL. 6" SL.
4" SL. 4" SL.4" SL. 4" SL.4" SL. 4" SL. 4" SL. 6" SL. 6" SL. 6" SL. 4" SL. 4" SL. 4" SL. 4" SL. 6" SL. 6" SL. 6" SL. 6" SL. 6" SL. 4" SL.
4" SL.
4" SL.
4" SL.
4" SL.
4" SL. 2" 2" 2" 2" 2" 2" 2" 2" 2"
6" SL. IRRIGATION PLAN ASCC SUBMITTAL 11/10/2020
O Date Renewal Date Signature
RNIA
O
F
CALIF
T TA S
E \
\ \ \ \ \ \
\ \ '\ \ \ \ \ \
\\\\\\'\'\
\ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \
\\\.\\\\'\
\\\\\\.
\\'\\\ \\
\\\\ \\
\ \
'\ \ \ \ \
\
\
\
.:~ ,/'~~,i----~
-~,-, -s;
_'~ \ y ( \ \ '''\\"\ '
,,,
-~~
,,,,,, -C.., ,,\\ \,' ·j\\\\
":'- \ ,";_-;,>,') \ \ \ \ \ \ \
\ \
\ \ \
\ \ \
\ \ \
\ \ \
I
I
I
\ \ \ '\
\ \ \ \ \ {is ,,,,,
;1 Ci \~~;;
I
I
I
I
6 ! .
~/; 7
V, ~,.q
/
/
/
/
/
/;
,,,
,,,
,,,
,,,
,,,
,,, ,,,,,,,,, /
.,,.. / / / / / / / / /; ,,,,,, ,,,,,, /
,,,.,,,.,,,.,,,~ ,,,.,,,,,,,,,.,,,,,,,,,
/ ./ / ./ / ./.,., / / ./ / / ~.,,...,,...,,...,,.. ./
,,,,,,,,,,,,,,,.,,,.,,..,,,.,,,,,,,,,,,,,,,,,,.,,..
.,,...,,...,,...,,...,,...,,...,,...,,...,,..,,,.,,...,,...,,...,,.. ./ ,,,.,,...,,...,,,.,,,.,., ,,,,,,.,,,,,,,,, ,,,.,,
,,,.,,,,,,.,,...,.,;.,,,,,.,,,,,, .,,,.,,,,,..
.,,,.,,,.,,.,,,.,,.,,,.,,,,,, .,,,,,,.,,,.,,,.,,,
,,,.,,,.,,,.,,, .,,,.,,,.,,,.,,...,,,,,,
/. / ./ / ./.,.,
./ / ./ ./ ./ /
~.,,..,,,.,,,,,,.
/;
\ ' \
\ \
\ \ \
\
\
\
\
,
,
,
\
\
\
\
r-
~\
\
\
y
\
,....
BROOK WATER
\
\
\
\
----- SIEGEL
&----=- s
=r
=R~A~I~N Architects
335
330
325
320
+ TW 347.5
+345.0
346 20 21 22 23 24 25 16
R
R
R
R
R
R
C 17181920 Project ID: Plot Date: Drawn by: Checked by:
Project Title:
Design Firm: Consultant: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA VALLEY FACULTY HOUSING
STANFORD UNIVERSITY
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date
07.1 4.2020 3295 Mission Street San Francisco, CA 94110 TEL 415 / 920-2800 [email protected] LUTSKO ASSOCIATES l a n d s c a p e O Date Renewal Date
Signature
RNIA
O
F
CALIF
T TA S
E PLANNING REV. 1 11/15/19 PLANNING REV. 2 07/14/20 IRRIGATION PLAN L4.3 -WMJL
SHEET L4.1
SHEET L4.2 1" = 20'-0" C-15 .64 1" 16 30 C-16 .95 1"
3 30 C-221.3 2.3130 1"C-21
7 .6430 1" 6" SL. PLEASANTON, CALIFORNIA 94566 IRRIGATION CONSULTANTS 480 ST. JOHN STREET, SUITE 220 E-MAIL [email protected] TEL 925.855.0417 FAX 925.855.0357 POINT OF CONNECTION. REFER TO CIVIL PLANS FOR WATER METER AND BACKFLOW PREVENTER SPECIFICATIONS. IRRIGATION DEMAND: 19 GPM AT 65 PSI. FIELD VERIFY STATIC WATER PRESSURE PRIOR TO STARTING ANY WORK. IF PRESSURE VARIES FROM REQUIRED PRESSURE STATED ABOVE, NOTIFY LANDSCAPE ARCHITECT FOR FURTHER INSTRUCTION. CONTROLLER NOTE: IRRIGATION CONTROLLER ‘C’ – PEDESTAL MOUNT AS DIRECTED BY ARCHITECT. SERVICE WITH 120 VOLT A.C. ELECTRICAL. ELECTRICAL SERVICE TO THIS LOCATION PROVIDED BY ELECTRICAL CONTRACTOR. GROUND CONTROLLER AND CONFORM TO ALL APPLICABLE LOCAL CODES. RUN A SEPARATE 1” CONDUIT WITH MANUFACTURER APPROVED DIRECT BURY SHIELDED FLOW SENSOR CABLE FROM CONTROLLER TO FLOW SENSOR. WEATHER SENSOR TRANSMITTER– INSTALL WHERE TRANSMITTER IS EXPOSED TO FULL WEATHER CONDITIONS. VERIFY COMMUNICATION RECEPTION TO THE RECEIVER PRIOR TO INSTALLATION. FINAL LOCATION TO BE DETERMINED IN THE FIELD. SEE ADJACENT CONTROLLER NOTE /4
3 " 1" C-17 .51 1" 17 40 C-18 2.3 1" 2.2 30 C-19 .64 1" 8 30 C-20 .95 1" 1 30 C-2312 .5340 1"C-24
7 .6430 1" C-28 .64 1" 11 30 C-27 .64 1" 13 30 C-26 2.31 1" 1.3 30 C-25 .64 1" 8 30 4" SL. 4" SL.
/4
3 " 1"
/4
3 "
/4
3 " 1
1/4"
/4
3 "
/4
3 " 1"
/4
3 "
/4
3 "
/4
3 "
/4
3 "
/4
3 "
/4
3 "
/4
3 " 1"
1 1/4" 2" 2"2" 2" 2" ASCC SUBMITTAL
11/10/2020
O Date Renewal Date Signature
RNIA
O
F
CALIF
T TA S
E / CMN / ' / =====--;cG c:;___::::;-±_, , ==cG G ---~,~'l'l , , / ---,'---- (l /, ' /'
/ //
I
' ' '
-,
-------
' -
/'I,,; CMN ;;
\
I
G G ,
/
/
ss ss
(l
/,7
' V'
I
I
CMN CMN
G G
ss ss
<
\
/
/4
ss ss
CMN SE
----~---
ss rn
G
U)
0 siil
CMN Ht
ss
G
A..'_ u '~ :
I ,J_ ss
G IG
~:I
ss ss
G
' ' \
ss
G-----
' '
G
\
' \
ss
' ' \
CMN / /
ss
BROOKWATER
' '
/
\
'
\
-
-~
' '
7 /
CMN
CTl I "' ~r
,
/
/
~rn rn
ss ss rn
G
I SIEGEL & STRAIN Architects I
Project ID: Plot Date: Drawn by: Checked by:
Project Title:
Design Firm: Consultant: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA VALLEY FACULTY HOUSING
STANFORD UNIVERSITY
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date
07.14.2020 3295 Mission Street San Francisco, CA 94110 TEL 415 / 920-2800 [email protected] LUTSKO ASSOCIATES l a n d s c a p e O Date Renewal Date Signature RNIA O F CALIF T TA S E PLANNING REV. 1 11/15/19 PLANNING REV. 2 07/14/20 IRRIGATION NOTES L4.4 -WMJL AND LEGEND SUB-SURFACE DRIPLINE (PRIVATE LOT BACKYARDS): RAIN BIRD XFCV-09-12 DRIPLINE WITH COPPER SHIELD TECHNOLOGY. USE ONLY RAIN BIRD XF INSERT FITTINGS. 2" COVER. (12" EMITTER SPACING; .9 GPH PER EMITTER) DRIPLINE NOTES 1. PLANS ARE DIAGRAMMATIC. INSTALL DRIPLINE AND COMPONENTS PER MANUFACTURERS INSTRUCTIONS AND INSTALLATION DETAILS. 2. INSTALL DRIPLINE A MAXIMUM OF 18” APART (12” IN BIORETENTION/TURF AREAS) WITH EMITTERS TRIANGULARLY SPACED. INSTALL 2” FROM PERIMETER OF PLANTED AREA. THERE SHOULD BE A MINIMUM OF TWO DRIPLINE LATERALS IN EACH PLANTED AREA. DRIPLINE SHALL BE INSTALLED AT A CONSISTANT DEPTH THROUGHOUT THE CIRCUIT. 3. PLACE FLUSH VALVES AT THE HYDRAULIC CENTER OF THE EXHAUST HEADER OR AT LOW POINT ON SLOPES. INSTALL MINIMUM OF ONE FOR EVERY 15 GPM. 4. INSTALL IN-LINE CHECK VALVES ON SLOPES GREATER THAN 3% AND WHERE LOW-LINE DRAINAGE COULD CAUSE WET AREAS IN THE LOWEST AREAS OF AN IRRIGATION ZONE. CHECK VALVES SHALL BE PLACED EVERY 4-5 FEET BETWEEN DRIPLINE LATERALS AND BEFORE THE FLUSH VALVE. 5. ON ALL SLOPES AND MOUNDS, PLACE THE DRIPLINE LATERALS PARALLEL TO THE SLOPE CONTOUR WHERE POSSIBLE. INCREASE THE LATERAL SPACING BY 25% ON THE LOWER ONE-THIRD OF THE SLOPE TO AVOID EXCESS DRAINAGE. 6. PVC SUPPLY AND FLUSH LINE SIZING GUIDE (ALL SUPPLY AND FLUSH LINES SHALL BE THE SAME SIZE FOR THE ENTIRE ZONE): • 0-8 GPM – 3/4” • 8.1-15 GPM – 1” • 15.1-25 GPM – 1 1/4” 8. FITTINGS SHALL BE OF THE SAME MANUFACTURER AS DRIPLINE. 9. STAPLE DRIPLINE TO GROUND EVERY 3 FEET. USE ADDITIONAL STAPLES OVER EACH TEE, ELBOW OR CROSS. USE U-SHAPED STAPLES TO AVOID PINCHING THE DRIPLINE. 10. THOROUGHLY FLUSH EACH INSTALLATION SEGMENT TO ENSURE NO DEBRIS CONTAMINATION OCCURS. 11. RUN THE DRIPLINE SYSTEM EVERY DAY OR EVERY OTHER DAY TO ESTABLISH PLANT MATERIAL. MAINTAIN A CONSISTENT MOISTURE BALANCE IN THE SOIL. IT IS IMPORTANT TO KEEP THE SOIL MOIST WITHOUT SATURATION. N/A PLEASANTON, CALIFORNIA 94566 IRRIGATION CONSULTANTS 480 ST. JOHN STREET, SUITE 220 E-MAIL [email protected] TEL 925.855.0417 FAX 925.855.0357 .43-1.10 1.48 .86-2.73 40 20' 19' 27' 26' 40 20' 19' 40 IRRIGATION LEGEND SYMBOL MODEL NUMBER DESCRIPTION LATERAL LINE: 1120-CLASS 200 PSI PVC SOLVENT WELD PIPE WITH SCHEDULE 40 PVC SOLVENT WELD FITTINGS. 12" COVER. SUB-SURFACE DRIPLINE: RAIN BIRD XFCV-06-18 DRIPLINE WITH COPPER SHIELD TECHNOLOGY. USE ONLY RAIN BIRD XF INSERT FITTINGS. 2" COVER. (18" EMITTER SPACING; .6 GPH PER EMITTER) 1" 15 C-1 301.6 30 10 GPH - - 30 5 GPH - - PSI MAX. RADIUS MAX. SPACING FLOW RATE (GPM) ESP-12LXMEF + (4) ESPLXMSM12/ IQ NCC 3G RAIN BIRD 48 STATION MODULAR CONTROLLER WITH IQ CELLULAR CARTRIDGE - WALL MOUNT XCZ-100-PRB-COM RAIN BIRD DRIP ZONE VALVE KIT - INCL. REMOTE CONTROL VALVE, PRESSURE REGULATING QUICK CHECK BASKET FILTER, AND PVC BALL VALVE RD-12-P30-F/MP2000-90 PCT-05 PCT-10 EBV-0500-S OPERIND PEB-PRS-D SERIES/LT-T SERIES 33DNP / SH-0 T-113-LF FS100B 2160-H - RAIN BIRD POP-UP SHRUB SPRAY W/ MP ROTATING NOZ. RAIN BIRD PRESSURE COMPENSATING DRIP BUBBLER INSTALL ONE BUBBLER PER SHRUB RAIN BIRD PRESSURE COMPENSATING DRIP BUBBLER INSTALL TWO BUBBLERS PER TREE KBI 1/2" BALL VALVE FOR FLUSHING RAIN BIRD POP-UP OPERATION INDICATOR RAIN BIRD REMOTE CONTROL VALVE WITH PRESSURE REGULATION / KBI PVC BALL VALVE RAIN BIRD 3/4" QUICK COUPLING VALVE WITH 3/4" HOSE SWIVEL (1 PER EVERY 10 QC's) NIBCO LEAD FREE GATE VALVE (LINE SIZE) RAIN BIRD BRASS FLOW SENSOR GRISWOLD 1" MASTER CONTROL VALVE (NORMALLY OPEN) REDUCED PRESSURE BACKFLOW PREVENTER - REFER TO CIVIL DRAWINGS CONTROLLER AND STATION NUMBER APPLICATION RATE (INCHES) OPERATING PRESSURE (PSI) OR AIR RELIEF VALVE QUANTITY APPROXIMATE GALLONS PER MINUTE REMOTE CONTROL VALVE SIZE SLEEVE (SL): 1120-CLASS 200 PVC PLASTIC PIPE. 24" COVER. RD-12-P30-F/MP2000-360 RD-12-P30-F/MP3000-90 RAIN BIRD POP-UP SHRUB SPRAY W/ MP ROTATING NOZ. RAIN BIRD POP-UP SHRUB SPRAY W/ MP ROTATING NOZ. CR - WATER METER BY OTHERS IC-600-PL / WSS-SEN FOR REAR YARDS ONLY: HUNTER I-CORE CONTROLLER WITH SOLAR SYNC WEATHER SENSOR MAIN LINE: 1120-SCHEDULE 40 PVC SOLVENT WELD PLASTIC PIPE WITH SCHEDULE 80 AND SCHEDULE 40 PVC SOLVENT WELD FITTINGS. 18" COVER. ALL MAINLINE FOR COMMON AREA SHALL BE 2" UNLESS OTHERWISE NOTED. MAINLINE FOR BACK YARDS SHALL BE 1". XACZ-075-PRF (FOR TREE BUB ZONES) XACZ-100-PRF (FOR DRIP ZONES) RAIN BIRD DRIP ZONE VALVE KIT - INCL. ANTI-SIPHON VALVE AND PRESSURE REGULATING FILTER IRRIGATION NOTES 1. THE CONTRACTOR SHALL REVIEW RELATED DRAWINGS AND SHALL ENSURE COORDINATION WITH ALL APPLICABLE TRADES PRIOR TO SUBMITTING BID. 2. THE IRRIGATION SYSTEM SHALL BE INSTALLED IN CONFORMANCE WITH ALL APPLICABLE STATE AND LOCAL CODES AND ORDINANCES BY LICENSED CONTRACTORS AND EXPERIENCED WORKERS. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND FEES RELATING TO THEIR WORK. 3. THIS DESIGN IS DIAGRAMMATIC. ALL PIPING, VALVES, ETC. SHOWN WITHIN PAVED AREAS IS FOR DESIGN CLARIFICATION ONLY AND SHALL BE INSTALLED IN PLANTING AREAS WHERE POSSIBLE. AVOID ANY CONFLICTS BETWEEN THE IRRIGATION SYSTEM, PLANTING AND ARCHITECTURAL FEATURES. PARALLEL PIPES MAY BE INSTALLED IN COMMON TRENCH. PIPES ARE NOT TO BE INSTALLED DIRECTLY ABOVE ONE ANOTHER. 4. DO NOT WILLFULLY INSTALL THE IRRIGATION SYSTEM AS SHOWN ON THE DRAWINGS WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS, GRADE DIFFERENCES OR DIFFERENCES IN THE AREA DIMENSIONS EXIST THAT MIGHT NOT HAVE BEEN CONSIDERED IN THE ENGINEERING. SUCH OBSTRUCTIONS OR DIFFERENCES SHOULD BE BROUGHT TO THE ATTENTION OF THE OWNER’S AUTHORIZED REPRESENTATIVE. IN THE EVENT THAT THIS NOTIFICATION IS NOT PERFORMED, THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY REVISIONS NECESSARY. 5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BECOME FAMILIAR WITH ALL GRADE DIFFERENCES, LOCATION OF WALLS, RETAINING WALLS, ETC. COORDINATE WORK WITH THE GENERAL CONTRACTOR AND OTHER SUBCONTRACTORS FOR THE LOCATION AND THE INSTALLATION OF PIPE SLEEVES THROUGH WALLS, UNDER ROADWAYS, PAVING, STRUCTURES, ETC. CONTRACTOR TO VERIFY THE LOCATION OF EXISTING UNDERGROUND UTILITIES AND STRUCTURES PRIOR TO THE EXCAVATION OF TRENCHES. CONTRACTOR IS TO REPAIR ANY DAMAGE CAUSED BY THEIR WORK AT NO ADDITIONAL COST TO THE OWNER. 6. DUE TO THE SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, FITTINGS, SLEEVES, ETC., WHICH MAY BE REQUIRED. CAREFULLY INVESTIGATE THE STRUCTURAL AND FINISHED CONDITIONS AFFECTING ALL WORK AND PLAN WORK ACCORDINGLY, FURNISHING SUCH FITTINGS, ETC., AS MAY BE REQUIRED TO MEET SUCH CONDITIONS. DRAWINGS ARE GENERALLY DIAGRAMMATIC AND INDICATIVE OF THE WORK TO BE INSTALLED. THE WORK SHALL BE INSTALLED IN SUCH A MANNER AS TO AVOID CONFLICTS BETWEEN IRRIGATION SYSTEMS, PLANTING, AND ARCHITECTURAL FEATURES. 7. ELECTRICAL CONTRACTOR TO SUPPLY 120 VAC (2.5 AMP) SERVICE TO CONTROLLER LOCATION. IRRIGATION CONTRACTOR TO MAKE FINAL CONNECTION FROM ELECTRICAL STUB-OUT TO CONTROLLER. IRRIGATION CONTROL WIRE SHALL BE #14, U.L. APPROVED FOR DIRECT BURIAL. COMMON WIRE SHALL BE #12 U.L. APPROVED AND SHALL BE WHITE IN COLOR. WIRING TO INDIVIDUAL REMOTE CONTROL VALVES SHALL BE COLOR OTHER THAN WHITE. 8. EACH CONTROLLER SHALL HAVE ITS OWN INDEPENDENT GROUND WIRE. 9. REMOTE CONTROL VALVES SHALL BE WIRED TO CONTROLLER IN SEQUENCE AS SHOWN ON PLANS. RUN WIRE FROM EACH RCV TO THE CONTROLLER. SPLICING WIRES TOGETHER OUTSIDE OF VALVE BOXES WILL NOT BE PERMITTED. 10. SPLICING OF 24-VOLT WIRES WILL NOT BE PERMITTED EXCEPT IN VALVE BOXES. LEAVE A 36” COIL OF EXCESS WIRE AT EACH SPLICE AND 100 FEET ON CENTER ALONG WIRE RUN. TAPE WIRE IN BUNDLES 10 FEET ON CENTER. NO TAPING PERMITTED INSIDE SLEEVES. 11. WIRE CONNECTORS SHALL BE 3M-DBR/Y-6 DIRECT BURY UNLESS OTHERWISE NOTED. 12. INSTALL ONE (1) SPARE CONTROL WIRE FOR EVERY 6 (SIX) STATIONS ON THE CONTROLLER ALONG THE ENTIRE MAIN LINE. SPARE WIRES SHALL BE THE SAME COLOR (ONE WITH A WHITE STRIPE) AND OF A DIFFERENT COLOR THAN OTHER CONTROL WIRES. LOOP 36” EXCESS WIRE INTO EACH SINGLE VALVE BOX AND INTO ONE VALVE BOX IN EACH GROUP OF VALVES. 13. VALVE LOCATIONS SHOWN ARE DIAGRAMMATIC. INSTALL IN GROUND COVER/SHRUB AREAS WHERE POSSIBLE. 14. INSTALL VALVE BOXES MINIMUM 12” FROM AND PERPENDICULAR TO WALK, CURB, BUILDING OR LANDSCAPE FEATURE. AT MULTIPLE VALVE BOX GROUPS, EACH BOX SHALL BE AN EQUAL DISTANCE FROM THE WALK, CURB, ETC. AND EACH BOX SHALL BE MINIMUM 12” APART. SHORT SIDE OF VALVE BOXES SHALL BE PARALLEL TO WALK, CURB, ETC. 15. PRESSURE REGULATING DEVICES ARE REQUIRED IF WATER PRESSURE IS BELOW OR EXCEEDS THE RECOMMENDED PRESSURE OF THE SPECIFIED IRRIGATION DEVICES. 16. LOCATE QUICK COUPLING VALVE 12” FROM HARDSCAPE AREA. 17. ALL SPRINKLER HEADS SHALL BE SET PERPENDICULAR TO FINISH GRADE OF THE AREA TO BE IRRIGATED UNLESS OTHERWISE DESIGNATED ON THE PLANS. 18. CHECK VALVES OR ANTI-DRAIN VALVES ARE REQUIRED ON ALL SPRINKLER HEADS WHERE LOW POINT DRAINAGE COULD OCCUR. FOR DRIP OR BUBBLER CIRCUITS, INSTALL KING BROS. CV SERIES CHECK VALVES IN LATERAL LINES FOR EVERY 10’ OF ELEVATION CHANGE. 19. FLUSH AND ADJUST ALL SPRINKLER HEADS FOR OPTIMUM PERFORMANCE AND TO PREVENT OVERSPRAY ONTO WALKS, ROADWAYS AND/OR BUILDINGS AS MUCH AS POSSIBLE. THIS SHALL INCLUDE SELECTING THE BEST DEGREE OF FIXED ARC (OR AN ADJUSTABLE ARC IF FIXED ARC DOES NOT MATCH THE ARC TO BE IRRIGATED) TO FIT THE SITE CONDITIONS AND TO THROTTLE THE FLOW CONTROL AT EACH VALVE TO OBTAIN THE OPTIMUM OPERATING PRESSURE FOR EACH SYSTEM. ALL MAIN LINES SHALL BE FLUSHED PRIOR TO THE INSTALLATION OF IRRIGATION HEADS, BUBBLERS AND DRIP TUBING. AT 30 DAYS AFTER INSTALLATION EACH SYSTEM SHALL BE FLUSHED TO ELIMINATE GLUE AND DIRT PARTICLES FROM THE LINES. 20. WHEN VERTICAL OBSTRUCTIONS (STREET LIGHTS, TREES, FIRE HYDRANTS, ETC.) INTERFERE WITH THE SPRAY PATTERN OF THE HEADS SO AS TO PREVENT PROPER COVERAGE, FIELD ADJUST THE SPRINKLER SYSTEM BY INSTALLING A QUARTER, THIRD OR HALF CIRCLE HEAD AT THE SIDES OF THE OBSTRUCTION SO AS TO PROVIDE PROPER COVERAGE. ALL ADJUSTMENTS SHALL BE MADE AT NO ADDITIONAL COST TO THE OWNER. 21. NOTIFY ARCHITECT OF ANY ASPECTS OF LAYOUT THAT WILL PROVIDE INCOMPLETE OR INSUFFICIENT WATER COVERAGE OF PLANT MATERIAL AND DO NOT PROCEED UNTIL HIS/HER INSTRUCTIONS ARE OBTAINED. 22. LOCATE BUBBLERS ON UPHILL SIDE OF TREES. TREE BUBBLERS ARE FOR ESTABLISHMENT AND DROUGHT CONDITIONS. THEY ARE TO BE TURNED OFF AFTER TREES ARE ESTABLISHED AND TURNED ON DURING DROUGHT CONDITIONS. 23. IN ADDITION TO THE SLEEVES AND CONDUITS SHOWN ON THE DRAWINGS, THE IRRIGATION CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE INSTALLATION OF SLEEVES AND CONDUITS OF SUFFICIENT SIZE UNDER ALL PAVED AREAS. 24. ALL EXCAVATIONS ARE TO BE FILLED WITH COMPACTED BACKFILL. REPAIR ALL SETTLED TRENCHES PROMPTLY, FOR A PERIOD OF 1 YEAR AFTER COMPLETION OF WORK. 25. CONTRACTOR SHALL WARRANT THAT THE IRRIGATION SYSTEM WILL BE FREE FROM DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF 1 YEAR AFTER FINAL ACCEPTANCE OF WORK. 26. WHERE IT IS NECESSARY TO EXCAVATE ADJACENT TO EXISTING TREES, USE ALL POSSIBLE CARE TO AVOID INJURY TO TREES, AND TREE ROOTS. EXCAVATION IN AREAS WHERE 2 INCH AND LARGER ROOTS OCCUR SHALL BE DONE BY HAND. ROOTS 2 INCHES AND LARGER IN DIAMETER SHALL BE WRAPPED IN A PLASTIC BAG AND SECURED WITH A RUBBER BAND. TRENCHES ADJACENT TO TREE SHOULD BE CLOSED WITHIN 24 HOURS; WHERE THIS IS NOT POSSIBLE, THE SIDE OF THE TRENCH ADJACENT TO THE TREE SHALL BE KEPT SHADED WITH BURLAP OR CANVAS. 27. THE IRRIGATION SYSTEM DESIGN IS BASED ON THE MINIMUM OPERATING PRESSURE SHOWN ON THE IRRIGATION DRAWINGS. VERIFY WATER PRESSURE PRIOR TO CONSTRUCTION. REPORT ANY DIFFERENCE BETWEEN THE WATER PRESSURE INDICATED ON THE DRAWINGS AND THE ACTUAL PRESSURE READING AT THE IRRIGATION POINT OF CONNECTION TO THE OWNER’S AUTHORIZED REPRESENTATIVE. 28. IRRIGATION DEMAND: REFER TO IRRIGATION POINTS OF CONNECTION. 29. OPERATE IRRIGATION CONTROLLER(S) BETWEEN THE HOURS OF 10:00 PM AND 7:00 AM. 30. NOTIFY ALL LOCAL JURISDICTIONS FOR INSPECTION AND TESTING OF INSTALLED BACKFLOW PREVENTION DEVICE. 31. NOTIFY UNDERGROUND SERVICE ALERT AT 811 AT LEAST 48 HOURS PRIOR TO ANY EXCAVATION. 32. A DIAGRAM OF THE IRRIGATION PLAN SHOWING HYDROZONES SHALL BE KEPT WITH THE IRRIGATION CONTROLLER FOR SUBSEQUENT MANAGEMENT PURPOSES. 33. A CERTIFICATE OF COMPLETION SHALL BE FILLED OUT AND CERTIFIED BY EITHER THE DESIGNER OF THE LANDSCAPE PLANS, IRRIGATION PLANS, OR THE LICENSED LANDSCAPE CONTRACTOR FOR THE PROJECT. 34. AN IRRIGATION AUDIT REPORT SHALL BE COMPLETED AT THE TIME OF FINAL INSPECTION. LATERAL LINE SIZING CHART BUBBLERS - 4 GPH SPRINKLER TYPE GPM 5.1-15 1-5 3/4" 1" PIPE SIZE NO. OF BUBBLERS* 76-225 1-75 * QUANTITY INDICATES NO. OF BUBBLERS, NOT NO. OF TREES. THERE ARE TWO BUBBLERS PER TREE AND ONE BUBBLER PER SHRUB. LATERAL LINE FROM REMOTE CONTROL VALVE TO FIRST BUBBLER SHALL BE 1" MINIMUM. BUBBLERS - 9 GPH 5.1-15 1-5 3/4" 33-96 1" 1-32 ASCC SUBMITTAL 11/10/2020 O Date Renewal Date Signature RNIA O F CALIF T TA S E .. • H llil m e 0 0 ' I L [ - - - - - - - - - - - - -] -------------- b-·-·-·-·-·-·-·-·-·-·-1 ·-·-·-·-·-·-·-·-·-·-·-· I SIEGEL & STRAIN Architects I BROOKWATER
Project ID: Plot Date: Drawn by: Checked by:
Project Title:
Design Firm: Consultant: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA VALLEY FACULTY HOUSING
STANFORD UNIVERSITY
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date
07.1 4.2020 3295 Mission Street San Francisco, CA 94110 TEL 415 / 920-2800 [email protected] LUTSKO ASSOCIATES l a n d s c a p e O Date Renewal Date
Signature
RNIA
O
F
CALIF
T TA S
E PLANNING REV. 1 11/15/19 PLANNING REV. 2 07/14/20 IRRIGATION DETAILS L4.5 -WMJL TORO DRIP ZONE KIT NOT TO SCALE 24 VOLT WIRE - ALLOW 36" OF EXCESS WIRE COILED 13" x 20" VALVE BOX WITH COVERWATER PROOF WIRE CONNECTORS FINISH GRADEDRIP ZONE KIT: REMOTE CONTROL VALVE, FILTER, AND PRESSURE REGULATOR PVC SCH 80 MALE ADAPTER (2) 3.0-INCH MINIMUM DEPTH OF 3/4-INCH WASHED GRAVEL PVC BALL VALVE SCH 80 NIPPLE (SIZE AS REQUIRED) PVC LATERAL BRICK (1 OF 4) PVC SCH 80 TEE OR ELL PVC SCH 80 ELL 0" IN TURF AREA 1" IN SHRUB/ GROUNDCOVER AREA ID TAG PVC MAINLINE 12" 18" 4 SCH. 80 UNION (FIPTxFIPT) NOT TO SCALE MASTER REMOTE CONTROL VALVE WIRE CONNECTOR MASTER REMOTE CONTROL VALVE 14" x 19" VALVE BOX 0" IN TURF AREAS 1" IN SHRUB AREAS FINISH GRADE SCH 80 UNION (FIPTxFIPT) PVC MAINLINE TO FLOW SENSOR BRICK SUPPORTS (4 TOTAL) SCH. 80 PVC NIPPLE (LENGTH AS REQUIRED) - 4 TOTAL 8" PEA GRAVEL BELOW VALVE SCH. 80 PVC ELL (2 TOTAL) PVC MAINLINE FROM P.O.C. 4" MIN. SCH 80 MALE ADAPTER 18" 2 FLOW FLOW 4" MIN. NOT TO SCALE PVC FLOW SENSOR INSTALLATION DETAIL NOTE: FLOW SENSOR MUST BE INSTALLED WITH INSERT (TOP) VERTICAL AND BODY (TEE) POSITIONED HORIZONTALLY. GAUGE DIRECT BURIAL SENSOR CABLE, PROVIDE 36" EXTRA CABLE. (MUST BE RUN IN 1" CONDUIT FROM SENSOR TO CONTROLLER) 14" x 19" VALVE BOX WITH BOLT DOWN LID FINISH GRADE PVC FLOW SENSOR SCH. 80 PVC PIPE MAINLINE FROM MASTER VALVE (UPSTREAM) MIN. UPSTREAM DISTANCE = 10 TIMES FLOW SENSOR SIZE SCH. 80 PVC RED. COUPLING LOCATED AT MASTER VALVE 8" DEEP 3/4" PEA GRAVEL SUMP PVC MAINLINE TO SYSTEM SCH 80 ELL (2 TOTAL) SCH. 80 PVC NIPPLE MIN. DOWNSTREAM DISTANCE = 5 TIMES FLOW SENSOR SIZE BRICK SUPPORTS (4 TOTAL) MALE ADAPTER 0" IN TURF AREAS 1" IN SHRUB AREAS WATERPROOF CONNECTIONS *NOTE POLARITY ON SENSOR TO SENSOR CABLE HOOKUP 3 18" #20 MIN. 12" EDGE OF LAWN, WALK, FENCE, CURB, ETC. TOP VIEW 12" MIN. MIN. 12" MIN. 12" MIN. 12" 12" MIN. NOTES: 1. CENTER BOX OVER VALVE TO FACILITATE SERVICING VALVE. 2. SET BOXES 1" ABOVE FINISH GRADE OR MULCH COVER IN GROUND COVER/SHRUB AREA AND FLUSH WITH FINISH GRADE IN TURF AREA. 3. SET VALVE BOX ASSEMBLY IN GROUND COVER/SHRUB AREA WHERE POSSIBLE. INSTALL IN LAWN AREA ONLY IF GROUND COVER/SHRUB AREA DOES NOT EXIST ADJACENT TO LAWN. 4. SET BOXES PARALLEL TO EACH OTHER AND PERPENDICULAR TO EDGE. 5. AVOID HEAVILY COMPACTING SOIL AROUND VALVE BOX EDGES TO PREVENT COLLAPSE AND DEFORMATION OF VALVE BOX SIDES. 6. VALVE BOXES SHALL HAVE BOLT DOWN LIDS WITH BOLTS INSTALLED. 7. VALVE BOXES SHALL BE BY NDS, CARSON, OR EQUAL. ROUND VALVE BOX 14"x19" RECTANGULAR VALVE BOX 13"x20" OR LARGER VALVE BOX NOT TO SCALE VALVE BOX INSTALLATION DETAIL 6 SECTION VIEW PLAN VIEW NOTES: 1. SLEEVE BELOW ALL HARDSCAPE ELEMENTS WITH SPECIFIED PVC PIPE TWICE THE DIAMETER OF THE PIPE OR WIRE BUNDLE WITHIN. 2. FOR PIPE AND WIRE BURIAL DEPTHS REFER TO IRRIGATION LEGEND AND SPECIFICATIONS. NOT TO SCALE PIPE AND WIRE TRENCHING MAINLINE, LATERAL, AND WIRING IN THE SAME TRENCH MAINLINE PIPE LATERAL PIPE PIPE AND WIRE SLEEVING WIRE W/O CONDUIT PROVIDE A MINIMUM OF 2" BETWEEN PIPES RUN WIRE BENEATH AND BESIDE MAINLINE. TAPE AND BUNDLE AT 10-FOOT INTERVALS. ALL SOLVENT WELD PLASTIC PIPING TO BE SNAKED IN TRENCH AS SHOWN TIE A 24" LOOP IN ALL WIRING AT CHANGES IN DIRECTION OF 30° OR GREATER. UNTIE AFTER ALL CONNECTIONS HAVE BEEN MADE. 4"4" 4" 4" 4" 4"4" BEDDING MATERIAL CLEAN BACKFILL - 90% COMPACTION REQUIRED 7 APPLY SCOTCHLOK Y SPRING CONNECTOR IN A CLOCKWISE DIRECTION. STEP 2: INSERT SPLICE TO BOTTOM OF GEL-FILLED TUBE. CHECK TO MAKE SURE CONNECTOR HAS BEEN PUSHED PAST LOCKING FINGERS AND IS SEATED AT BOTTOM OF TUBE. STEP 3: POSITION WIRES IN WIRE CHANNELS AND CLOSE INSULATOR TUBE COVER. STEP 4: NOTE: MAXIMUM WIRE SIZES PER CONNECTOR ARE THREE # 14'S OR TWO #12'S. STEP 1: STRIP WIRES 1/2" FROM ENDS. NOT TO SCALE WIRE CONNECTION DETAIL 8 3" NOT TO SCALE GATE VALVE DETAIL 10" ROUND PLASTIC VALVE BOX WITH BOLT DOWN LID FINISH GRADE 0" IN LAWN 1" IN SHRUB/ GROUNDCOVER AREA 6" PVC PIPE GATE VALVE BRICK-3 TOTAL PEA GRAVEL 4" DEEP (NO SOIL IN BOX) SCH 80 PVC MALE ADAPTER PVC MAINLINE 9 18" 12" MIN. 3" TOP VIEW SIDE VIEW NOT TO SCALE QUICK COUPLER IN BOX DETAIL x 3" SCH. 80 PVC NIPPLE (2 REQ.) QUICK COUPLING VALVE FINISH GRADE 10" ROUND PLASTIC VALVE BOX WITH BOLT DOWN LID. x 6" SCHEDULE 80 PVC NIPPLE PVC MAINLINESCH. 80 PVC TEE (SxSxT) SCHEDULE 80 PVC ELL (TxT) (3 REQ.) CRUSHED ROCK (NO SOIL IN BOX) BRICK-3 TOTAL LEEMCO LS-100 QUICK COUPLING STABILIZER WALK, CURB OR HEADER 3/4" 10 3/4" AS SHOWN PLEASANTON, CALIFORNIA 94566 IRRIGATION CONSULTANTS 480 ST. JOHN STREET, SUITE 220 E-MAIL [email protected] TEL 925.855.0417 FAX 925.855.0357 NOT TO SCALE PEDESTAL MOUNT CONTROLLER DETAIL PEDESTAL 120 VOLT A.C. ELECTRICAL SUPPLY SWITCH FINISH GRADE 1" CONDUIT FOR FLOW SENSOR CABLE IRRIGATION CONTROLLER DIRECT BURIAL 24 VOLT CONTROL WIRING TO REMOTE CONTROL VALVES CONCRETE PAD - 6" THICK (MIN.) EXTEND 6" BEYOND EACH SIDE AND BACK; 24" IN FRONT W/1/2% SLOPE FOR DRAINAGE. PVC SWEEP ELL 18" 1.5" 1 POP-UP SHRUB SPRAY FINISH GRADE 1/2" SCHEDULE (LENGTH AS 80 PVC NIPPLE REQUIRED) PVC LATERAL LINE SCHEDULE 40 PVC TEE STREET ELL 1/2" SCH. 40 40 PVC ELL 1/2" TxT SCH STREET ELL 1/2" SCH. 40 (S x S x T) HEADERBOARD CURB, WALK OR WALL, BUILDING FENCE OR NOT TO SCALE SHRUB POP-UP INSTALLATION DETAIL 12" 4" 1" NOTE: PRE-FABRICATED SWING JOINTS MAY BE USED. SWING JOINTS SHALL BE BY LASCO, RAINBIRD, OR EQUAL 11 12" 4" MIN. NOT TO SCALE REMOTE CONTROL VALVE & BALL VALVE 0" IN TURF AREA 1" IN SHRUB/ GROUNDCOVER AREA 2 1/4" x 2 3/4" ID TAG WIRE CONNECTORS 36-INCH LINEAR LENGTH OF 24 VOLT WIRE, COILED FINISH GRADE 14" x 19" VALVE BOX, ONE REMOTE CONTROL VALVE PER BOX REMOTE CONTROL VALVE SCH 80 PVC BALL VALVE SCH 80 PVC NIPPLE (4) LENGTH AS REQUIRED SCH 80 PVC ELL (TxT) BRICK (1 OF 4) PVC MAINLINE SCH 80 PVC NIPPLE (2 INCH, HIDDEN) AND SCH 80 PVC ELL SCH 40 PVC TEE OR ELL 4" MIN. DEPTH OF PEA GRAVEL (NO SOIL IN VALVE BOX) LOWER LATERAL LINE WITH SCH 40 PVC 45 ELLS PVC LATERAL LINE SCH 40 PVC MALE ADAPTER 18" 12" 5 ASCC SUBMITTAL
11/10/2020
O Date Renewal Date Signature
RNIA
O
F
CALIF
T TA S
E _l_ I 11 1 0 o~----- 01..,..__ ____ _ 01..,..__ ____ _ 01--------- I SIEGEL & STRAIN Architects l_ - - - - - o~----- o~----- 01--------- 01--------- • BROOKWATER 0------------ 0------ 01--------
Project ID: Plot Date: Drawn by: Checked by:
Project Title:
Design Firm: Consultant: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA VALLEY FACULTY HOUSING
STANFORD UNIVERSITY
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date
07.1 4.2020 3295 Mission Street San Francisco, CA 94110 TEL 415 / 920-2800 [email protected] LUTSKO ASSOCIATES l a n d s c a p e O Date Renewal Date
Signature
RNIA
O
F
CALIF
T TA S
E PLANNING REV. 1 11/15/19 PLANNING REV. 2 07/14/20 IRRIGATION DETAILS L4.6 -WMJL CENTER FEED INLINE DRIP LAYOUT NOT TO SCALE AV MANIFOLD CONNECTION (PVC TO ELL - SEE INSERT) PVC SUPPLY HEADER (12" DEPTH) MANIFOLD CONNECTION (SEE INSERT) REMOTE CONTROL VALVE WITH FILTER AND PRESSURE REGULATOR DRIPLINE LATERAL AIR/VACUUM RELIEF LATERAL BLANK TUBING CENTERED ON MOUND OR BERM AIR/VACUUM RELIEF VALVE (PLUMBED TO TUBING AT EACH HIGH POINT) PVC EXHAUST HEADER ZONE FLUSH VALVE PLUMBED TO PVC (TYP) PERIMETER LATERAL 2" FROM EDGE INLINE DRIP EMITTER (O.C. SPACING TBD) PVC PIPE TO NEXT DRIPLINE SECTION (IF REQUIRED) IN OPERATION INDICATOR FVFV IN 16 AV
FV PLAN FLUSH VALVE PLUMBED TO FLUSH MANIFOLD AT LOW POINT IN OPERATION INDICATOR CONNECTED TO DRIPLINE, INSTALLED AT THE EDGE OF THE LANDSCAPE END OF DRIPLINE ZONE NEAR FLUSH VALVE PVC EXHAUST HEADER MANIFOLD-TO-ELBOW CONNECTION DRIPLINE LATERAL AREA PERIMETER PERIMETER LATERALS 2" TO 4" FROM EDGE PVC LATERAL LINE FROM DRIP ZONE KIT DRIPLINE TEE AIR/VACUUM RELIEF VALVE PLUMBED TO SUPPLY MANIFOLD AT HIGH POINT (IF REQUIRED.) PVC SUPPLY MANIFOLD TYPICAL ISLAND LAYOUT END FEED NOT TO SCALE PERIMETER LATERALS 2" TO 4" FROM EDGE IN 17 PVC FLUSH MANIFOLD AREA PERIMETER DRIPLINE INLINE DRIP LAYOUT FOR SLOPES NOT TO SCALE AIR/VACUUM RELIEF VALVE PLUMBED TO PVC FLUSH MANIFOLD JUST BELOW EACH CHECK VALVE PVC LATERAL LINE FROM REMOTE CONTROL VALVE INLINE SPRING CHECK VALVE PERIMETER LATERALS 2" FROM EDGE AUTOMATIC FLUSH VALVE PLUMBED TO FLUSH MANIFOLD AT LOW POINT HIGH POINT ON SLOPE USE WHEN SLOPE EXCEEDS 3% IN DIRECTION OF FLOW AIR/VACUUM RELIEF VALVE PLUMBED TO PVC FLUSH MANIFOLD AT HIGH POINT PVC SUPPLY MANIFOLD DO NOT INSTALL DRIPLINE AT THE VERY BOTTOM OF SLOPE 25% MORE SPACING AT BOTTOM 1/3 OF SLOPE IN OPERATION INDICATOR INSTALLED AT THE EDGE OF THE LANDSCAPE, AT END OF DRIPLINE ZONE NEAR FLUSH VALVE FV 18 INLINE DRIP SPACING LAYOUT ON SLOPE NOT TO SCALE ALIGN DRIPLINE LATERALS PARALLEL TO THE CONTOURS OF THE SLOPE CONVENTIONAL SPACING ON TOP 2/3 OF SLOPE CONVENTIONAL SPACING PLUS 25% ON BOTTOM 1/3 OF SLOPE PVC SUPPLY HEADER TOP OF SLOPE AIR/VACUUM RELIEF ASSEMBLY LATERAL TUBING PVC EXHAUST HEADER TOE OF SLOPE LINE FLUSHING VALVE ASSEMBLY NOTE: DO NOT INSTALL THE LAST DRIPLINE LATERAL AT BOTTOM OF SLOPE. 19 NOT TO SCALE 1" PVC PIPE BRICK SUPPORTS (3) PVC ELBOW OR TEE (SxT) 3 4" SCH 80 PVC NIPPLE (LENGTH
AS REQUIRED) TORO DL2000 AUTOMATIC FLUSH VALVE (FCH-H-FIPT) FINISHED GRADE 6" ROUND VALVE BOX TORO DL2000 AUTOMATIC FLUSH VALVE - PLUMBED TO PVC PEA GRAVEL SUMP (18" DEEP) NOT TO SCALE 14 TREE BUBBLER DETAIL PVC LATERAL LINE ROUTED AROUND ROOTBALL (DO NOT GO THROUGH ROOTBALL) SCH. 4O PVC FITTINGS (TYPICAL) PVC LATERAL LINE FINISH GRADE 1/2" SCH. 80 MALE ADAPTER (GRAY) 9 GAGE TUBING STAKE 1/2" UV RESISTANT PVC FLEXIBLE HOSE ROOTBALL BUBBLER TREE 12 12" BUBBLER PVC LATERAL LINE PVC TEE 1/2" SCH. 40 1/2" SCH. 80 MALE ADAPTER FINISH GRADE 9 GAGE TUBING STAKE 1/2" UV RESISTANT PVC FLEXIBLE HOSE SHRUB NOTE: INSTALL BUBBLER ON UPHILL SIDE OF SHRUB NOT TO SCALE SHRUB BUBBLER ON FLEX HOSE DETAIL 13 12" AS SHOWN PLEASANTON, CALIFORNIA 94566 IRRIGATION CONSULTANTS 480 ST. JOHN STREET, SUITE 220 E-MAIL [email protected] TEL 925.855.0417 FAX 925.855.0357 RAIN BIRD OPERIND OPERATION INDICATOR NOT TO SCALE OPERIND OPERATION INDICATOR FINISH GRADE SUBSURFACE DRIPLINE MULCH NOTE: 1. USE TOOL TO INSERT BARB TRANSFER FITTING DIRECTLY INTO DRIPLINE TUBING. 2. VAN NOZZLE MAY BE SET TO CLOSED, OR IF IT IS DESIRED TO SEE SPRAY FROM THE NOZZLE, SET THE ARC TO 1/4 PATTERN. THE FLOW FROM THE NOZZLE, 0.3 GPM, SHOULD BE ACCOUNTED FOR IN THE SYSTEM DESIGN. 15 ASCC SUBMITTAL 11/10/2020 O Date Renewal Date Signature
RNIA
O
F
CALIF
T TA S
E -Ill -=I 11 D Q • d • • • . . D of-------- 01------- 0------ Qr-------- I SIEGEL & STRAIN Architects TT --,., ~ -
k: " "-
AV
-
/
I>-
I/
/ I
I/ I;
I/ I/
I
L
v'·
I/
' I
\
,.
I ' ' '
0 ' ' '
-
' 0
Qi-------- 0------ Qi-------- 0------
BROOKWATER
Project ID: Plot Date: Drawn by: Checked by:
Project Title:
Design Firm: Consultant: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA VALLEY FACULTY HOUSING
STANFORD UNIVERSITY
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date
07.1 4.2020 3295 Mission Street San Francisco, CA 94110 TEL 415 / 920-2800 [email protected] LUTSKO ASSOCIATES l a n d s c a p e O Date Renewal Date
Signature
RNIA
O
F
CALIF
T TA S
E PLANNING REV. 1 11/15/19 PLANNING REV. 2 07/14/20 IRRIGATION DETAILS L4.7 -WMJL ISOMETRIC
3 2 1
4 5
6 7
8 9 1. FINISH GRADE. 2. DEPTH OF TUBING PER SPECIFICATIONS 3. DEPTH OF PVC SUPPLY MANIFOLD PER SPECIFICATIONS. 4. DRIPLINE TEE FITTING. 5. DRIPLINE LATERAL. 6. BLANK POLY TUBING, LENGTH AS NECESSARY. 7. DRIPLINE MPT ADAPTER. 8. PVC TEE (SxSxT) WITH 1/2" FPT OUTLET. 9. PVC SUPPLY MANIFOLD FROM REMOTE CONTROL VALVE ASSEMBLY. CENTER FEED MANIFOLD NOT TO SCALE LEGEND 20 AS SHOWN PLEASANTON, CALIFORNIA 94566 IRRIGATION CONSULTANTS 480 ST. JOHN STREET, SUITE 220 E-MAIL [email protected] TEL 925.855.0417 FAX 925.855.0357 1 23
4 5
6 7
1 2
4 5
6 7
3 36" MIN. WALL MOUNT AUTOMATIC SPRINKLER CONTROLLER (EXTERIOR WALL MOUNT) 1/2" UL APPROVED ELECTRICAL CONDUIT, RING NUT AND JUNCTION BOX FOR 120V AC ELECTRICAL POWER FINISH GRADE PVC SCHEDULE 40 CONTROL WIRE CONDUIT - PVC SWEEP ELL (DEPTH AS REQUIRED) CONTROL WIRES TO ELECTRIC VALVES EXTERIOR SURFACE FOR MOUNTING OF SPRINKLER CONTROLLER NOTE: ALL ELECTRICAL WORK MUST CONFORM TO LOCAL CODES. REFER TO PRODUCT LITERATURE FOR ADDITIONAL INSTALLATION REQUIREMENTS. NOT TO SCALE RESIDENTIAL CONTROLLER - OUTDOOR 1.5" 23 DETAILS 23 - 25 ARE FOR BACK YARDS ONLY NOT TO SCALE HUNTER SOLAR SYNC WEATHER SENSOR WALL MOUNT CONTROLLER - REFER TO CONTROLLER DETAIL CONDUIT FOR CONTROL WIRE POWER SOURCE WIRELESS SOLAR SYNC RECEIVER MOUNTED ON WALL NEXT TO CONTROLLER SOLAR SYNC MODULE (MOUNT LESS THAN 6' FROM CONTROLLER SUITABLE POST, POLE, OR GUTTER MOUNT. SOLAR SYNC SENSOR (MOUNT UP TO 800' FROM RECEIVER) NOTE: MOUNT SENSOR IN LOCATION THAT MAXIMIZES DIRECT SUNLIGHT, OPEN TO RAINFALL AND OUT OF SPRINKLER SPRAY 24 XERIGATION CONTROL ZONE KIT (ANTI-SIPHON) NOT TO SCALE 12" MIN. SCH. 80 UNIONPVC LATERAL LINE SCHEDULE 80 PVC SxT ELL (2) RAIN BIRD DRIP ZONE KIT (INCL. ANTI-SIPHON VALVE AND PRESSURE REGULATING FILTER FINISH GRADE PVC MAINLINE SCH. 80 PVC NIPPLE. LENGTH AS REQUIRED (2) NOTES: 1. VALVE MUST BE INSTALLED MIN. 12" ABOVE HIGHEST SPRINKLER OR EMISSION POINT IT SUPPLIES. 2. APPLY TEFLON TAPE TO ALL THREADED CONNECTIONS. 24 VOLT WIRE - ALLOW 36" OF EXCESS WIRE COILED WATER PROOF WIRE CONNECTORS ID TAG UNION BALL VALVE 12" 18" 25 ASCC SUBMITTAL 11/10/2020 O Date Renewal Date Signature
RNIA
O
F
CALIF
T TA S
E • • • • • • • • • • • ,------,.._., . . . • ,~ • • of------- 0 ~-------(0 0 0 ------0 0 0 0 0 1~11111~11111~11111~ O 1111 11111 11111 1111 of------- I SIEGEL & STRAIN Architects I DI 8 of------- Qr------- • BROOKWATER
Project ID: Plot Date: Drawn by: Checked by:
Project Title:
Design Firm: Consultant: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA VALLEY FACULTY HOUSING
STANFORD UNIVERSITY
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date
07.14.2020 3295 Mission Street San Francisco, CA 94110 TEL 415 / 920-2800 [email protected] LUTSKO ASSOCIATES l a n d s c a p e O Date Renewal Date Signature RNIA O F CALIF T TA S E PLANNING REV. 1 11/15/19 PLANNING REV. 2 07/14/20 IRRIGATION WORKSHEETS L4.8 -WMJL N/A PLEASANTON, CALIFORNIA 94566 IRRIGATION CONSULTANTS 480 ST. JOHN STREET, SUITE 220 E-MAIL [email protected] TEL 925.855.0417 FAX 925.855.0357 ASCC SUBMITTAL 11/10/2020O Date Renewal Date Signature RNIA O F CALIF T TA S E Cl1Y OF STANFORD PORTOLA VALLEY HOUSING PORTOLA VALLEY WATER EFFICIENT LANDSCAPE WORKSHEET LANDSCAPE WATER USE STATEMENT PROJECT NAME: STANFORD PORTOLA VALLEY HOUSING Reference Evapotranspiration (Eto) 48.6 PROJECT ADDRESS ALPINE ROAD PREPARED BY: JANET LUEHRS (CID. CLIA #43274) HYDROZONE' PLANT IRRIGATION IRRIGATION ETAF HYDROZONE ETAFx ESTIMATED % BROOKWATlER INC, IRRIGATION CONSULTANTS ZONE PLANT (PLANT FACTOR METHOD" EFFICIENCY AREA HA TOTAL WATER USE LANDSCAPE 480 SAINT JOHN STREET, SUITE 220 NO. 1YPE WATER USE) (PFl (I El (PF/I El (HA) (So Ft) (ETWUl AREA PLEASANTON, CA 94566 REGULAR LANDSCAPE AREA 925-855-0417 925-855-0357 (FAX) C-1 TREE LW 0.30 B 0.81 0.37 151 56 1 685 0.3% [email protected] (e-mail) C-2 SHRUB LW 0.30 B 0.81 0.37 233 86 2,600 0.4% C-3 SHRUB LW 0.30 DL 0.81 0.37 2 415 894 26,951 4.5% "I have complied with the criteria of the Water Efficient Landscape Ordinance and applied them C-4 SHRUB LW 0.30 DL 0.81 0.37 1 991 737 22 220 3.7% C-5 TREE LW 0.30 B 0.81 0.37 63 23 703 0.1% accordingly for the efficient use of water in the irrigation design plan." C-6 SHRUB LW 0.30 DL 0.81 0.37 2,739 1,014 30 567 5.1% C-7 TREE LW 0.30 B 0.81 0.37 38 14 424 0.1% Signed: ;(uJwv C-8 SHRUB LW 0.30 DL 0.81 0.37 2,040 756 22,766 3.8% C-9 SHRUB LW 0.30 DL 0.81 0.37 2 094 776 23 369 3.9% C-10 TREE LW 0.30 B 0.81 0.37 13 5 145 0.0% C-11 SHRUB LW 0.30 DL 0.81 0.37 2,311 856 25,791 4.3% PART ONE MAXIMUM APPLIED WATER ALLOWANCE (MAWA) C-12 TREE LW 0.30 B 0.81 0.37 75 28 837 0.1% MAWA = ETo x .62 x[(ETAFx HA)+ ((1-ETAF) x SLA)] C-13 SHRUB LW 0.30 DL 0.81 0.37 2,684 994 29,953 5.0% C-14 SHRUB LW 0.30 DL 0.81 0.37 1 483 549 16 550 2.7% YEARLY ETo 48.6 C-15 SHRUB LW 0.30 DL 0.81 0.37 2,334 864 26,047 4.3% C-16 SHRUB LW 0.30 B 0.81 0.37 283 105 3,158 0.5% CONVERSION FACTOR 0.62 C-17 SHRUB LW 0.30 MR 0.75 0.40 3,123 1,249 37,641 5.8% C-18 TREE LW 0.30 B 0.81 0.37 88 33 982 0.2% ETAF 0.45 C-19 SHRUB LW 0.30 DL 0.81 0.37 1,070 396 11 941 2.0% C-20 SHRUB LW 0.30 B 0.81 0.37 78 29 870 0.1% TOTAL IRRIGATlED LANDSCAPE AREA (HA) 54,168 SQUARE FEET C-21 SHRUB LW 0.30 DL 0.81 0.37 1,048 388 11,696 1.9% C-22 TREE LW 0.30 B 0.81 0.37 50 19 558 0.1% SPECIAL LANDSCAPE AREA (SLA) 0 SQUARE FEET C-23 SHRUB LW 0.30 MR 0.75 0.40 2,160 864 26,034 4.0% C-24 SHRUB LW 0.30 B 0.81 0.37 212 79 2 366 0.4% C-25 SHRUB LW 0.30 DL 0.81 0.37 1,186 439 13,236 2.2% LANDSCAPE WATER ALLOWANCE 734,486 GALLONS PER YEAR C-26 TREE LW 0.30 B 0.81 0.37 50 19 558 0.1% TOTAL ACRE FEET 2.25 ACRE FEET C-27 SHRUB LW 0.30 DL 0.81 0.37 1,909 707 21,304 3.5% I SIEGEL & STRAIN Arc hit ects I C-28 SHRUB LW 0.30 DL 0.81 0.37 1,517 562 16,930 2.8% C-29 TREE LW 0.30 B 0.81 0.37 13 5 145 0.0% C-30 SHRUB LW 0.30 DL 0.81 0.37 1,865 691 20,813 3.4% C-31 SHRUB LW 0.30 DL 0.81 0.37 2,022 749 22,566 3.7% PART TWO ESTIMATED TOTAL WATER USE (ETWU) C-32 SHRUB LW 0.30 DL 0.81 0.37 1,400 519 15,624 2.6% C-33 SHRUB LW 0.30 DL 0.81 0.37 2,406 891 26,851 4.4% (AVERAGE ETAF AND ETWU FROM WATlER EFFICIENT LANDSCAPE WORKSHEET) C-34 TREE LW 0.30 B 0.81 0.37 63 23 703 0.1% C-35 SHRUB LW 0.30 DL 0.81 0.37 1,555 576 17,354 2.9% AVERAGE ETAF FOR REGULAR LANDSCAPE AREAS 0.37 C-36 SHRUB LW 0.30 DL 0.81 0.37 2,731 1,011 30,478 5.0% (TOTAL ETAF x AREA/ TOTAL AREA) C-37 TREE LW 0.30 B 0.81 0.37 25 9 279 0.0% C-38 SHRUB LW 0.30 DL 0.81 0.37 1,491 552 16,640 2.8% ETWU FOR REGULAR LANDSCAPE AREAS 609,232 GALLONS PER YEAR C-39 SHRUB LW 0.30 DL 0.81 0.37 2,455 909 27 398 4.5% C-40 TREE LW 0.30 B 0.81 0.37 38 14 424 0.1% SITE WIDE ETAF 0.37 C-41 TREE LW 0.30 B 0.81 0.37 25 9 279 0.0% C-42 SHRUB LW 0.30 DL 0.81 0.37 2,218 821 24,753 4.1% ETWU FOR ALL LANDSCAPE AREAS 609,232 GALLONS PER YEAR C-43 SHRUB LW 0.30 DL 0.81 0.37 2,098 777 23,414 3.9% C-44 SHRUB LW 0.30 B 0.81 0.37 325 120 3,627 0.6% TOTAL ACRE FEET 1.87 ACRE FEET TOTALS (REGULAR LANDSCAPE AREAS) 54,168 20,219 609,232 100.0% t"~l)SCA,pE: (,,\) \,. D- F. Uc'_ -1,1.'i,1 0 -(,.c.f ,j;::: ,;'; -·"' ./~ '- -~- SPECIAL LANDSCAPE AREA S_]f,} O'c, HYDROZONESUMMARY - - 0 0 1.00 0 0 0 0.0% * * 09-30-22 *Hydrozone Description Total Sq. Ft. % of Landscape 11-11-19 Cool Season Turf (CST) 0 0.0% TOTALS (SPECIAL LANDSCAPE AREASl 0 0 0 0.0% '--- / Warm Season Turf (WST) 0 0.0% High Water Use Plants (HW) 0 0.0% Bioretention Plants (BR) 0 0.0% Medium Water Use Plants (MW) 0 0.0% Low Water Use Plants (LW) 54,168 100.0% Very Low Water Use Plants (VLW) 0 0.0% Water Feature 0 0.0% Special Landscape Area (SLA) 0 0.0% - - - - I I . ·- - TOTAL 54,168 100.0% **Irrigation Method Total Sq. Ft. % of Landscape Rotor (FC-R, PC-R) 0 0.0% Multi-Stream Rotator (MR) 5,283 9.8% Spray (S) 0 0.0% Bubbler (B) 1,823 3.4% Drip (D) 0 0.0% In-Line Drip (DL) 47,062 86.9% Micro Spray (MS) 0 0.0% Other (0) 0 0.0% - -- BROOK WATER
ALPINE ROAD
BMR Blow Up Plan
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 BMR 1
26 27
BMR 2
BMR 3
NOTE:
Exterior lights at houses/BMR buildings to be controlled by manual ON/OFF switch and an automatic time switch or an astronomical time clock. Lights at site/public areas to be controlled by an automatic time switch or an astronomical time clock.
Symbol Manufacturer Model #
Light Wedge
DLED131-DL-240-CF2500-13
Description
Exterior sconce - small
Exterior sconce - large
Lamp w/ wattage
2.1W LED
QTY. Mounting
Wood bollard mounted
Wood bollard mounted
30 12
Dreamscape
108 Tech Lighting Pitch Single Wall Sconce
700W SPIT-S-H-LED827
Exterior wall sconce -
architectural
LED 80, 120V Building mounted
Tech Lighting Pitch Single Wall Sconce
700W SPIT-S-H-LED827
LED 80, 120V
Lumens
120
823
823
0 1 inch = ft. 40
GRAPHIC SCALE
40 80 120
Project ID:
Plot Date:
Drawn by:
Checked by:
Project Title:
Design Firm:
Consultant:
Stamp:
Issue Note:
Sheet No.:
Sheet Title:
File Name:
Scale:
6201 Doyle Street, Suite B
Emeryville, CA 94608
TEL 510 / 547-8092
FAX 510 / 547-2604
[email protected]
17-034 SPVH PORTOLA VALLEY FACULTY HOUSING STANFORD UNIVERSITY ASCC
SUBMITTAL
11/10/20 Alpine Road, Portola Valley, CA 94028 APN#: 077281020 No. Description Date
11.10.2020
3295 Mission Street
San Francisco, CA 94110
TEL 415 / 920-2800
[email protected]
LUTSKO ASSOCIATES
l a n d s c a p e
O
Date Renewal Date Signature RNIA
O
F CALIF
T TA
S
E
PLANNING REV. 1 11/15/19
PLANNING REV. 2 07/14/20
L5.1
Lighting Plan
1" = 40'-0"
LIGHTING SCHEDULE
BMR BLOW-UP PLAN SCALE: 1"=20'-0"
//
/
:/-::-
/
/
/
//
/
/ /
/
I
/
I
I
/
/
/
/ /
/
/
/
/
/
/
/
/ -
/
/
/
/
-
1/
I
/
/
-
1/
"J-0
/
/
/
@
/
/
/
,1/
/
/
/
/ /
/
/
/
/
/
/
/
/
0 /
~
/
/
\
\
/
/
/
/
/
/
/
\
/
/
/
/
/
/
~
I
\ ) f .. - ..
--------
~
A /
~
~ ~
I
1/
½ ~
5=¾// 1 - \ •
--=---=---=---::. ,~
/ / I
/ /
/
/
0 /
~,L -
,r
I
/
..
-
I
/
/
/
/
I
/
/
/
/
/ ..
-- ---=
\ \
/
/
/ / / / /
/
\
I
/
/
/
/
.. I -
/
/ /
/ /
\ \ - +---) -
I !
\ \
- ) ___ _,__,
I I
\
I
I
~\ ___ \
I I
0 •
-
I ---J
~
~--V11A- ) 1 1
I
I
/
\
I I
I
I
f
/
..
\
I
~
I
/
-
\
-j
I
' (,/v'<, /
X // I
--/ ~ ~/
\ /
;\
/
\
(
\ _ .. )
-/ - --/ ' - -
\ \
/
I I
/
\
/
\
7 I
/
I /
I SIEGEL & STRAIN Archi tects I
1'-6" Drill holes in post for wire Finish grade Conc footing 6" soil
cover Angle top 5° to shed water Steel bracket. See M/F SCHED for finish. 4x redwood post Dreamscape Wedge light fixture mounted on post 1'-10"
3'-6" Drill holes in post for wire Finish grade Conc footing 6" soil
cover Angle top 5° to shed water Steel bracket. See M/F SCHED for finish. 6x redwood post Pitch Single Wall Sconce 2'-8"
2 1 Bollard Light - Large Bollard Light - Small Project ID: Plot Date: Drawn by: Checked by: Project Title: Design Firm: Consultant: Stamp: Issue Note: Sheet No.: Sheet Title: File Name: Scale: 6201 Doyle Street, Suite B Emeryville, CA 94608 TEL 510 / 547-8092 FAX 510 / 547-2604 [email protected] SPVH
PORTOLA VALLEY FACULTY HOUSING
STANFORD UNIVERSITY ASCC SUBMITTAL 11/10/20
Alpine Road, Portola Valley, CA 94028
APN#: 077281020 No. Description Date 11.10.2020 3295 Mission Street San Francisco, CA 94110 TEL 415 / 920-2800 [email protected] LUTSKO ASSOCIATES l a n d s c a p e O Date Renewal Date Signature
RNIA
O
F
CALIF
T TA S
E PLANNING REV. 1 11/15/19 PLANNING REV. 2 07/14/20 SCALE: 1"=1'-0" SCALE: 1" = 1'-0" L5.2 Lighting Cutsheets 3 Dreamscape Light Wedge SCALE: NTS
4 Tech Lighting Pitch Single Wall Sconce SCALE: NTS as noted PI
TCH SI NG LE WALL SCONCE
An architectural profile reminiscent of beautifully classic roof I ines delivers significant light output in this modern LED wall sconce suitable for both indoor and outdoor applications.
The Pitch Single's die-cast metal body houses powerful LED light sources that create visual appeal as light cascades down along a wall.
High quality LMBO-tested LEDs
for cons istent long-life performance and co lor
Outstanding protection against the elements:
• Powder coat fin ishes
• Stainless Steel mounting hardware
• Impact-res istant, UV stabilized frosted acry lic lensing Can be mounted for up lighting or down lighting
SPECIFICATIONS
DELIVERED LUMENS
WATTS
VOLTAGE
DIMMING
LIGHT DISTRIBUTION M OUNTING OPTIONS
"'
COLOR BIN NING
BUG RATING DARK SKY
WET LISTED
GENERAL LISTING
26.1 T20V, 277V
Symm,.trlc
Downlight or Uplight
2700K, JOOOK
3 Sl"P
B1-UO-GO
Compliant (Downlight)
IP65
m
CALIFORNIA TITLE 24
Ca11 be used to comply with CEC 2016 Title 24
Part 6 for outdoor u,e. Registration with CEC
Appliance Database not required .
START TEMP
FIELD SERVICEABLE LED
CONSTRUCTION
HARDWARE
FINISH
LED LIFETIME
WARRANTY* WEIGHT
-30°C
Aluminum
Stainl,.ssSte"I
Powd"r Coat L70; 70,000 Hours
5 Year,
Ulbs.
• Visit techlighting.com for specifi c warranty limitations and deta ils.
ORDERING INFORMATION
700WSPIT SIZE
S SINGLE
FIN ISH
B BLACK Z BRONZE
H CHARCOAL
I SI LVER
-LEDl27 L.ED 80CRI. 2700K 120V
-LEDl272n I.ED 80 CRI. 2700K 277V
-LED&30 I.ED 80 CRI. 300DK 120V
-LED&30277 I.ED 80 CRI, 277V
techlighti ng.com
PITCH SINGLE
shown in black
PITCH SINGLE
shown in charcoal
.,l TECH LIGHTING"
PITCH SINGLE
shown in bronze
PITCH SINGLE
shown in silver
dream scape DLED-131S
and DL
E
D-131L LED Light
Wedge
1~
~------------~
PROJE CT
Fixture Description:
A brass wet location surface mounted down accent light designed primarily for post, deck and step lighting where a rustic wedge shape is desired utilizing an energy saving 2.1 watt LED panel with 120 lumens output.
Construction:
Solid brass mounting plate and cover.
Electrical:
Remote 12V AC power supply from magnetic transformer or driver.
WARNING: Solid state transformers may not be compatlble with our LED products. Recommended power supplies: Use
approved magnetic transformers or approved LED electronlc drivers.
Mounting:
Fixtures may mount directly to wood
or mount to DL-240 Brass
for large Wedge, or
DL-241 Brass for small Wedge.
Finishes:
1. Verde, 2. Satin Nickel, 3. Copper Bronze, 4. White*,
5. Ancient Bronze, 6. Brass Bronze, 7, Custom, 8. Copper Plate, 9. Ancient Verde, 1 O. Grey Bronze, 11. Rust Brown*,
12. Black•,11a. Pewter I
* Powder coat
Lenses:
Difh.Jsion and clear glass lens.
Optional warm color filter available.
CATALOO NUMBER
DL-240
Large Light Wedge
Br.,s.s Junction
Back Box
DL-241
2-1/8"----->-
Accent Lighting for Wet Location
Lamping: 1 x 2.1W 3000K LED Panel
DL-1 31/L-LED
I--,. --1 4-1/2"
Solite and Clear
Glass Lenses
Small Brass Light JuWedge nction ?/B":::l1-l" r
Back Box
DL-131/5-LED
with Optional GAM
Color FI iter
0 0
2.1WLED
I~
r-1--,.--1 1~3-3110· ~I
Solite and Clear
Glass Lenses
with Optional GAM
Color Fllter
T
2•3/4N
_I
To Fonn a Part No Opijonal Back Box Optional Folter Fintsh Catalog Number. DLE0-131L OL-240 CF-2500 5
Which Specifies: Light Wedge Large
DLED-131S
Light Wedge Small
Ordering Example: DLED-131L-DL-240-CF-2500-5
02016 Dreamscapa Ughtlng
ma s,tjsctto char!Jl
,Mttrut nolca. 1
5521
W. Washington Blvd.
LosAngeles,CA 90016
OL-240 Large
OL-241 Small
I Telephone: (323) 933-5760 FAX: (323) 933-3607
Optional wann
COior Alter
I
www.dreamscapellghllng.com
infoCdreamllCSplllighling.com
1. ver11e, 2. Satin Nickel,
3. Copper Bronze, 4. WIIIW, 5.
Ancient Bronze, 6. Brass llnx1ze,
7. Custom, a. COpper Plate, 9.
Ancient llerde, 10. Grey Bronze,
11. Aust Brown•, 12. Black*, 13.
•
-· Powder emit
lntert ek
DLED-13"1_051216
SIEGEL & STRAIN Architects