Item 11 - Pre-Development Conf. 22-002 Proposal to Permanently Close Stowe Dr. Between Kirkham Way & Scripps Poway Pkwy to Public

Poway City Council
April 19, 2022

Document
Item 11 - Pre-Development Conf. 22-002 Proposal to Permanently Close Stowe Dr. Between Kirkham Way & Scripps Poway Pkwy to Public
Meeting
April 19, 2022
Body
Poway City Council
Pages
2
Original file
41 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

April 19, 2022, Item #11
~ AGENDA REPORT CityofPoway
'>
1 Tri\ ' CITY COUNCIL
DATE:

TO:

FROM:

CONTACT:

SUBJECT:

Summary:

April 19, 2022
Honorable Mayor and Members of the City Council
Robert Manis, Director of Development Services /4
Melody Rocco, City Engineer JJ..f--
(858) 668-4653 or [email protected]
Pre-Development Conference 22-002; a Request for Review of a Proposal to Permanently Close Stowe Drive Between Kirkham Way and Scripps Poway Parkway to the Public
General Atomics Aeronautical Systems, Inc. (General Atomics) is proposing to permanently close Stowe Drive between Kirkham Way and Scripps Poway Parkway to the p'ublic. Closure of the road to the public would directly connect General Atomics facilities on both sides of the street.

The review of Pre-Development Conference (PDC) 22-002 is advisory only. The City Council will not render any decision. If the Applicant wishes to proceed with an application, it is with the understanding that the City Council has made no representation upon which the Applicant may rely.

Recommended Action:

It is recommended the City Council provide input and direction regarding the request.

Discussion:

General Atomics owns and occupies a large number of buildings in the Poway Business Park. This includes all of the buildings that access Stowe Drive between Kirkham Way and Scripps Poway Parkway. The properties are owned by Sorrento West Properties, Inc., which is one of General Atomics' real estate companies. General Atomics has indicated that their employees frequently need to cross Stowe Drive and large equipment and materials are regularly transferred between buildings.

Attachment A is a location map showing this section of Stowe Drive and its location compared to nearby streets that also provide a connection between Kirkham Way and Scripps Poway Parkway.

General Atomics is proposing to permanently close this section of Stowe Drive to facilitate access for their employees and equipment transfers.

Stowe Drive is designated as a Business Park Collector in the Transportation Master Element of the General Plan. It has four travel lanes with a two-way left turn lane and sidewalks on both sides. The 1 of 29
April 19, 2022, Item #11
road has a posted speed limit of 35 mph. There is no on-street parking and no designated bike lanes.

While not marked as a bicycle facility, bicyclists can share the vehicular travel lanes. The roadway design Average Daily Traffic (ADT) is 30,000 vehicles. According to the Impact Summary (Attachment B), the current ADT is 5,100 vehicles. Based upon this preliminary report, 40% of the vehicles are attributed to General Atomics facilities within this section of Stowe Drive and approximately 60% of the vehicles would be re-routed by the road closure. The report goes on to state that approximately three quarters of this 60%, or 45% of the total ADT, is estimated to be related to General Atomics facilities on Kirkham Way. This would equate to approximately 85% of the Stowe Drive traffic belonging to General Atomics and their employees. The estimated data would need to be verified by further traffic analysis, should the City Council allow the applicant to pursue this project and should the applicant choose to submit a formal application.

In December 2011, the City Council approved a mid-block crosswalk on Stowe Drive approximately 410 feet north of Kirkham Way to help safely facilitate employee crossings between General Atomics facilities. The mid-block crosswalk included a small median with pedestrian refuge, lighting, and signage. The improvements were installed and accepted as complete by the City Council in August 2013. In April 2020, the City Council approved a second mid-block crosswalk on Stowe Drive approximately 430 feet south of Scripps Poway Parkway. The second crossing has not yet been installed. Attachment C is a location map showing the existing and proposed mid-block crosswalks.

General Atomics has provided an exhibit showing how they would potentially close Stowe Drive, see -Attachment D. The gates would be set back from the intersections at Scripps Poway Parkway and Kirkham Way to prevent any vehicular queuing at the gates from impacting the adjacent intersections.

There would be a guard shack along with vehicle arms at either end of the street and fencing with gates and electronic access for when no guard is present. An example of the access gate and guard shack from another General Atomics facility is provided as Attachment E.

There are potentially two options for how a closure could be processed. The public right-of-way could be vacated in which case, the right-of-way would be relinquished to General Atomics who owns the adjacent properties. The other option would be for a long-term lease of the right-of-way. Both options have items that would need to be addressed.

There are currently six parcels that access this portion of Stowe Drive, five of which have frontage on Stowe Drive. Should General Atomics pursue a vacation of the right-of-way, private road easements would need to be dedicated allowing access for all properties to both Scripps Poway Parkway and Kirkham Way. All of the properties have the same ownership, and a property owner cannot dedicate an easement to themself across another property that they own. While the issue of private road easements is not a concern while the properties remain under the same ownership, this would need to be addressed if any of the properties are sold. Staff would likely require a covenant be recorded on each property requiring the easements be granted at the time any of the six properties is sold.

With a long-term lease, the City would retain ownership of the right-of-way so it could be reverted to public right-of-way and public access in the future. The sale of any one property or a change in the tenancy of a building would need to be addressed in the contract language of a long-term lease. Due to the high-security nature of General Atomics facilities, it is unlikely that a non-General Atomics tenant would be allowed access to the secured facility. If so, the long-term lease would need to be terminated or modified.

Currently this section of Stowe Drive has many different types of facilities that are maintained by the 2 of29
April 19, 2022, Item #11
Public Works Department. This includes but is not limited to the asphalt and concrete pavement, roadway signage and striping, streetlights, water, reclaimed water, sewer, and landscaping and irrigation that is part of a Landscape Maintenance District (LMD). As part of a street vacation, the City would reserve easement rights to maintain the water, reclaimed water, and sewer systems, at a minimum. As currently proposed, the guard shack at the south end of the road is located on top of the existing sewer main. This installation would not be permitted as it would prevent long term maintenance of the sewer system. Either the guard shack or the sewer main would need to be relocated. Relocation of the sewer main would require processing a public improvement plan. The streetlights would need to be modified to be connected to a private electrical meter to be privately maintained. The roadway signage and striping between the guard shacks could be modified as needed for General Atomics use. The pavement, landscaping, and irrigation would become privately owned and maintained. Under a lease agreement, the maintenance of the public facilities would be a part of the financial negotiations of the contract. Changes to the signage and striping between the entry gates could be modified but would need to be restored upon termination of the lease.

Regardless of whether a vacation or a lease were to be processed, access for Public Works staff and emergency personnel from the Fire and Sheriff's Departments would need to be provided. A knox box allowing access for both the Fire and Sheriff's Departments would need to be installed for when no security guards are present. The Sheriffs Department has also indicated they would need 24-hour contact information posted on the outside of the gates. The striping and sign age outside of the gates would need to be modified to provide clear indication to the public that this section of Stowe Drive is a private street and an appropriate space to turn around would need to be provided. Additional signage on Scripps Poway Parkway, Kirkham Way, and Stowe Drive, north of Scripps Poway Parkway would need to be added indicating that Stowe Drive south of Scripps Poway Parkway is private and through access is not available. These signage and striping changes would be removed upon termination of the lease but would remain in perpetuity if a street vacation is processed. The public improvements would be processed as part of a public improvement plan.

There are several properties along Kirkham Way that could be negatively impacted by the privatization of Stowe Drive. Most of the properties that access directly off of Kirkham Way have General Atomics as the building tenant and would therefore have access to and through Stowe Drive. There are six properties that are owned by others, including one City owned lot that is leased to the Poway Auto Dealers Association for vehicle storage. Removing Stowe Drive from the Business Park circulation would increase traffic volumes on both Tech Center Drive and General Atomics Way. While those increases are not anticipated to be excessive, other forms of mobility are also impacted. The public would no longer be able to cycle or walk along this section of Stowe Drive. Any person that wants to cycle or walk from this area of Kirkham Way to Scripps Poway Parkway or vice versa would need to go around via Tech Center Drive, which is approximately 2,275 feet to the west, or General Atomics Way, which is approximately 3,500 feet to the east. The trip for a cyclist or walker from the intersection of Kirkham Way at Stowe Drive to Scripps Poway Parkway at Stowe Drive will increase by a minimum of 4,550 feet if they choose the route on Tech Center Drive. There are commercial facilities at the shopping center on the northwest corner of Stowe Drive and Scripps Poway Parkway that include restaurants and a bank, among other facilities, that could generate trips by both cyclists and pedestrians from Kirkham Way.

The review of PDC 22-002 is advisory only. The City Council will not render any decision. If the Applicant desires to proceed with an application, it is with the understanding that the City Council has made no representation upon which the Applicant may rely. The Agreement of Understanding is included as Attachment F.
3 of29
April 19, 2022, Item #11
Environmental
Review:

Because
no
action
can
be
taken,
this
item
is
not
a
"Project"
pursuant
to
the
California
Environmental
Quality
Act
(CEQA)
and
is
therefore
not
subject
to
CEQA
review.

Fiscal
Impact:

Vacation
of
a
public
street
would
create
a
minor
reduction
in
future
pavement
management
costs.

This
includes
refreshing
striping
every
two
years,
street
maintenance
every eight
years,
and
sidewalk
maintenance
on
an
as-needed
basis.

A
small
decrease
to
the
budget
of
LMD
19-1
would
occur
if
the
landscaping
and
irrigation
were
to
be
privately
maintained.

Maintenance
of
other
City
utilities
would
remain
unchanged.

Financial
impacts
of
a
long-term
lease
are
unknown
at
this
time
but
could
include
both
lease
payments
and
a
decrease
in
maintenance
costs
over
the
life
of
the
lease.

Public
Notification:

None. Attachments: A.

Location
Map
B.

Stowe
Drive
Closure
Study
-
Preliminary
Transportation
Impact
Summary
C.

Stowe
Drive
Mid-Block
Crosswalk
Locations
Map
D.

Stowe
Drive
Closure
Exhibit
E.

Example
Access
Gate
F.

Agreement
of
Understanding
Reviewed/
Approved
By:

Assistant
City
Manager
4of29
Reviewed
By:

Alan
Fenstermacher
City
Attorney
Approved
By:

City
Manager
April 19, 2022, Item #11
u,
0 -ti
N
\D
)>
~
~
)>
n :c s: m
z
~
)>
g ~--'C)(i'o\tt~·~
f~ . I f'~C]~'\
~- J)~ ·' '­
~/J'.J~f.<;i~
Print Date:
3/7/2022
Location Map
Disclainer: Map and parcel data are beieved lo be accurate. but acruracy is not guaranteed. This is not a legal document and shoukl not be substtuted for a title search. apQraisal , survey , or ror zoning verifjcation.

Map Scale:
1:9,028
April 19, 2022, Item #11
MEMORANDUM To: From
:

Nathan
L.

Scrivo,
RA,
NCARB
General
Atomics
&
Affiliates
Walter
B.

Musial,
PE,
RSP
LLG
, Engineers
Date:

February
4,
2022
LLG
Ref:
3-21-3435
Subject:

Stowe
Drive
Closure
Study
-
Preliminary
Transportation
Impact
Summary
Linscott,
Law
&
Greenspan,
Engineers
(LLG)
have
prepared
the
following
summary
of
impacts
to
the
local
transportation
system
due
to
the
proposed
Stowe
Drive
closure
project
("Project").

Based
on
our
analysis,
the
Project
would
affect
auto,
transit,
pedestrian,
bicycle,
and
parking
conditions
as
follows:

Project
Summary
The
Project
proposes
to
close
Stowe
Drive
in
the
City
of
Poway
between
Scripps
Poway
Parkway
and
Kirkham
Way
to
vehicular
through
traffic.

See
project
vicinity
and
more
detailed
project
area
in
Figures
2-1
and
2-2.

The
Project
would
continue
to
allow
vehicular
access
to
this
portion
of
Stowe
Drive
for
the
buildings
that
have
driveways
located
along
this
roadway
. Access
would
be
gated
with
the
secure
perimeter
around
the
existing
General
Atomics
Aeronautical
Systems,
Inc.
(GA-ASI)
buildings
on
either
side
of
Stowe
Drive
extended
to
Stowe
Drive. The
Project
has
several
objectives,
including:
■
Safety
for
GA-ASI
staff
walking
between
buildings
and
crossmg
Stowe
Drive.
•
Enhanced
security for
GA-ASI
operations
.
•
Increased
ability
for
GA-ASI
to
move
large
equipment
and materials
between
buildings.

Auto
Conditions
Project
Traffic
Volumes
■ ■
Peak
hour
(7-9
AM
&
4-6PM)
traffic
counts
were
conducted
at
the
intersections
of
Stowe
Drive
with
Scripps
Poway
Parkway
and
Kirkham
Way
which
bookend
the
Project
area.

Additionally,
traffic
counts
at
each
individual
driveway
on
Stowe
Drive
between
Scripps
Poway
Parkway
and
Kirkham
Way
were
conducted.

Based
on
these
traffic
counts
and
using
the
average
of
the
AM
and
PM
peak
hours,
of
traffic
on
Stowe
Drive,
approximately
40%
is
directly
accessing
driveways
along
the
roadway.

The
remaining
60%
may
be
rerouted
with
a
road
closure.
•
Trips
were
rerouted
as
follows:
6 of29

ATTACHMENT
B
N:·.3435
-Report
Stowe
Drive
Impact
Summary
(rev2).docx

LINSCOTT LAW
&
GREENSPAN engineers
Engineers
&
Planners
Traffic Transportati
on
Parking Linscott,
Law
&
Greenspan,
Engineers
4542
Ruffner
Stree
t
Suite
100
San
Diego,
CA
92111
858.300
.8800
T
858.300.8810
F
www.
llgengineers.com
Pasadena Irvine San
Diego
Wood
land
Hi
lls
April 19, 2022, Item #11
Nathan L. Scrivo
February 4, 2022

Page 2 ends

o Trips generally oriented to/from Scripps Poway Parkway west of Stowe Drive were rerouted via Tech Center Drive. In other words, eastbound traffic inbound to the area would make a right tum at Tech Center Drive rather than Stowe Drive, using Tech Center Drive and Kirkham Way. Conversely, rerouted northbound lefts at Stowe Drive would become northbound lefts at Tech Center Drive.
o Trips generally oriented to/from Stowe Drive north of Scripps Poway Parkway would be rerouted via Parkway Center Drive and Tech Center Drive. Rerouted southbound and northbound through trips at Scripps Poway Parkway / Stowe Drive would be shifted to Scripps Poway Parkway / Tech Center Drive via Parkway Center Drive.

Rerouted traffic continues via Tech Center Drive and Kirkham Way. o Trips generally oriented to/from Scripps Poway Parkway east of Stowe Drive were rerouted via General Atomics Way. Westbound traffic inbound to the area would make a left tum at General Atomics Way rather than Stowe Drive, using General Atomics Way and Kirkham Way. Conversely, rerouted northbound rights would at Stowe Drive would become northbound rights at General Atomics Way.
■ Additionally, approximately ¾ of this 60% is estimated to be related to General Atomics facilities along Kirkham Way. Therefore, the total General Atomics traffic on Stowe Drive is estimated at 85% (40% + 45%). This is based on a comparison of peak hour turning movement volumes at Stowe Drive/ Kirkham Way and General Atomics Way/ Kirkham Way.

Study Area Roadway Conditions
■ The Project study area includes seven (7) intersections and seven (7) street segments that would be affected by the rerouted Project traffic described above.
■ All study area locations are calculated to operate within capacity before and after the proposed road closure.
■ Per City of Poway criteria, the Project does not have any substantial effects on the street system.
■ The most constrained locations, both in terms of baseline traffic and receiving the most rerouted traffic due to the Project, are the following:
7 of29
o Intersection -Scripps Poway Parkway/ Tech Center Drive/ Parkway Centre Drive (signalized)
o Street Segment -Tech Center Drive, Scripps Poway Parkway to Kirkham Way
i'i: 3435·Report St1Jwe Drive fmpact Summary {re,·11.doc:-.

LINSCOTT
LAW &

GREENSPAN
engineers
April 19, 2022, Item #11
Nathan
L.

Scrivo
February
4,
2022
Page
3 ■
Signal
timing/phasing
improvements
could
be
provided to
offset
the
effects
of
the
Project
in
these
locations.

Additional
improvements
may
be
requested.
■
The
parcels
immediately
south
of
Kirkham
Way
/ Stowe
Drive
would
be
the
most
directly
impacted
by
the
proposed
closure.

LLG
assessed
travel
time
to/from
representative
locations
to
the
west,
north,
and
east.

The
time
and
distance
for
routes
avoiding
Stowe
Drive
between
Scripps
Poway
Parkway
and
Kirkham
Way
result
in
no
more
than
approximately
one-tenth
mile
in
distance
and
one
minute
or
less
in
time
added
during peak
times.

Parking
Conditions
■
On-street
parking
is
not
currently
permitted on
Stowe
Drive.

Therefore,
there
would
be
no
loss
or
displacement
of
parking
due
to
the
Project.

Transit
Conditions
■
There
are
no
fixed
route
transit
services
in
the
area.

Therefore,
the
project
would
not
impact
any
transit
routes
or
access
to
stops.

Active
Transportation
(Pedestria
_n
and
Bicycle)
Conditions
■
Although
existing
pedestrian
and
bicycle
activity
(in
terms
of
trips
to/from
Stowe
Drive
at
either
end,
rather
than
mid-block
crossings)
is
low,
the
Project
would
restrict
public
pedestrian
and
bicycle
activity
between
Scripps
Poway
Parkway
and
Kirkham
Way.
■
Given
existing
intersection
spacing
there
would
be
an
approximately
one-mile
gap
with
no
pedestrian
or
bicycle
access
between
Scripps
Poway
Parkway
and
Kirkham
Way.

An
existing
trail
system
is
accessed
from
Kirkham
Way,
west
of
Stowe
Drive.
■
Improvements
such
as
constructing
missing
sidewalks
and
crosswalks
on
Tech
Center
Drive,
an
alternative
route,
could
be
provided
to
help
mitigate
pedestrian/bicycle
access
impacts.

Vehicle
Miles
Traveled
(YMT)
■
The
Project
results
in
a reduction
in
the
number
of
vehicular
travel
lanes.

For
this
reason,
the
Project
may
be
presumed
to
have
a less
than
significant
CEQA
transportation
impact.
8 of29 ~:
3-435
-Rc-port
Shmc-
Driw
Imp
·t
Summ
rv
(revl
i.tiocx

LINSCOTT LAW
&
GREENSPAN engineers
April 19, 2022, Item #11
Nathan L. Scrivo
February 4, 2022
Page4
Tables:

Table 8-1
Table 8-2
Table 10-1
Table 10-2
Figures:

Figure 2-1
Figure 2-2
Figure 3-1
Figure 3-2
Figure 6-1
Figure 7-1
Figure 7-2
Figure 9-1
Figure 9-2
Figure 9-3
Figure 12-1
Figure 12-2
Near-Term Intersection Operations
Near-Term Street Segment Operations
Long-Term Intersection Operations
Long-Term Street Segment Operations
Vicinity Map
Project Area Map
Existing Conditions Diagram
Existing Traffic Volumes
Near-Term without Project Traffic Volumes
Near-Term Project Traffic Volumes
Near-Term+ Project Traffic Volumes
Long-Term without Project Traffic Volumes
Long-Term Project Traffic Volumes
Long-Term + Project Traffic Volumes
Bicycle Network
Pedestrian Network
cc: Nick Palermino, General Atomics
File
9 of29
N: H35·Rt>port Stowe Drive Impact Summary (rev'2).d0<,x

LINSCOTT
LAW &

GREENSPAN
engineers
April 19, 2022, Item #11
TABLE
8-1

NEAR-TERM

INTERSECTION

OPERATIONS
Intersection
Control Type

1. Tech
Center
Dr/
Scripps
Poway
Pkwy
Signal

2. Stowe
Dr
I Scripps
Poway
Pkwy
Signal

3. General
Atomics
Way/
Signal
Scripps
Poway
Pkwy

4. Tech
Center
Dr/
Gregg
St
Signal

5. Tech
Center
Dr/
Kirkham
AWSC<l
Way

6. Stowe
Dr
I Kirkham
Way
AWSC

7. Kirkham
Way
/ General
AWSC
Atomics
Way
Footnotes:
a.

Average
delay
expressed
in
seconds
per
vehicle.
b.

Level
of
Service.
c.
!J.
denotes
the
change
in
delay
due
to
Project.
d.

A WSC
=
All-Way
Stop
Controlled
intersection
.

LINSCOTT,
LAW
&

GREENSPAN,
engineers
10 of
29 Near-Term
Peak
Without
Project
Hour
Delay
a
LOSb
AM

26.0 C
PM

32.8 C
AM

21.0 C
PM

19.0 B
AM

20.5 C
PM

30.1 C
AM

8.7 A
PM

12.1 B
AM

8.0 A
PM

9.4 A
AM

9.3 A
PM

9.1 A
AM

8.0 A
PM

10.8 B
22 Near-Term +
Project
Ac
Substantial
Effect?
Delay
LOS

27.5 C

1.5 No

36.4 D

3.6 No

17.8 B
(3.2)
No

13.9 B
(5.1)
No

21.7 C

1.2 No

32.6 C

2.5 No

9.2 A

0.5 No

16.8 B

4.7 No

9.4 A

1.4 No

10.4 B

1.0 No

9.0 A
(0.3)
No

8.6 A
(0.5)
No

8.2 A

0.2 No

11.9 B

1.1 No

SIGNALIZED

UNSIGNALIZED

DELAY/LOS

THRESHOLDS

DELAY/LOS

THRESHOLDS
Delay
LOS
Delay
LOS

0.0 :'.S
10 .0
A 0
.0
:'.S

10.0 A

10.1 to
20 .0
B
10 .1 to

15.0 B
20 .1 to
35 .0 C

15.l
to
25 .0
C

35.1 to
55 .0
D

25.1 to
35 .0
D
55 .1 to

80.0 E
35 .1 to

50.0 E
2:

80.1 F
2:
50 .1
F
LLG
Ref
. 3-21-3435
Stowe
Drive
Closure
Study
April 19, 2022, Item #11
TABLE8-2

NEAR-TERM STREET SEGMENT OPERATIONS
Near-Term Without
Street Segment Capacity Project (LOSE) a
ADTb Lose
Scripps Poway Parkway

1. Tech Center Dr to Stowe Dr 63,000 19,510 A

2. Stowe Dr to General Atomics 63,000 17,920 A Way
Tech Center Drive

3. Scripps Poway Pkwy to Gregg 22,000 14,440 C St
Stowe Drive

4. Scripps Poway Pkwy to 37,000 5,100 A Kirkham Way f
General Atomics Way

5. Scripps Poway Pkwy to 22,000 6,100 A Kirkham Way
Kirkham Way

6. Tech Center Dr to Stowe Dr 37,000 6,540 A

7. Stowe Dr to General Atomics 37,000 4,660 A Way
Footnotes:
a. Capacities based on City of Poway Roadway Classification Table b. Average Daily Traffic Volumes.
c. Level of Service.
d. Volume to Capacity.
e. !),. denotes a Project-related change in the Volume to Capacity (V/C) ratio. f. Roadway segment to be closed under Project conditions.

LINSCOTT, LAW & GREENSPAN, engineers
11 of 29 23
V/Cd

0.310

0.284

0.656

0.138

0.277

0.177

0.126
Near-Term+ Project Ae Substantial

ADT LOS
18,860 A
17,540 A
15,820 D
--
6,480 A
7,920 A
5,040 A
Effect?
V/C

0.299 (0.011) No

0.278 (0.006) No

0.719 0.063 No
- --

0.295 0.018 No

0.214 0.037 No

0.136 0.010 No
LLG Ref. 3-21-3435
Stowe Drive Closure Study
April 19, 2022, Item #11
Intersection

1. Tech Center Dr I Scripps Poway Pkwy

2. Stowe Dr/ Scripps Poway Pkwy

3. General Atomics Way / Scripps Poway
Pkwy

4. Tech Center Dr I Gregg St

5. Tech Center Dr I Kirkham Way

6. Stowe Dr/ Kirkham Way

7. Kirkham Way/ General Atomics Way
Footnotes:
a. Average delay expressed in seconds per vehicle.
b. Level of Service.
c. Ii denotes the change in delay due to Project.
d. A WSC = All-Way Stop Controlled intersection.

LINSCOTT, LAW & GREENSPAN, engineers
12 of 29
TABLE 10-1
LONG• TERM INTERSECTION OPERATIONS
Control Peak
Type Hour
AM Signal PM
AM Signal PM
AM Signal PM
Signal AM
PM
AWSC<l AM
PM

AWSC AM
PM

AWSC AM
PM
29 Horizon Year Horizon Year
Without Project With Project Ac Substantial
Effect?
Delaya LOSb Delay LOS

27.3 C 28.7 C 1.4 No

34.2 C 38.5 D 4.3 No

20.7 C 17.6 B (3.1) No

18.1 B 13.0 B (5.1) No

21.0 C 22.1 C 1.1 No

36.4 D 41.0 D 4.6 No

8.7 A 9.2 A 0.5 No

12.1 B 17.3 B 5.2 No

8.1 A 9.9 A 1.8 No

9.8 A 11.0 B 1.2 No

9.6 A 9.2 A (0.4) No

9.5 A 8.7 A (0.8) No

8.1 A 8.3 A 0.2 No

11.0 B 12.3 B 1.3 No

SIGNALIZED UNSIGNALIZED

DELAY/LOS THRESHOLDS DELAY/LOS THRESHOLDS
Delay LOS Delay LOS

0.0 ::, 10.0 A 0.0 :S 10.0 A

10.l to 20.0 B 10.l to 15.0 B

20.1 to 35.0 C 15.l to 25.0 C

35.l to 55.0 D 25.l to 35.0 D

55.l to 80.0 E 35.l to 50.0 E
c:: 80.l F c:: 50.l F
LLG Ref. 3-21-3435
Stowe Drive Closure Study
April 19, 2022, Item #11
TABLE10-2
LONG•
TERM
STREET

SEGMENT

OPERATIONS
Long-Term
without
Street
Segment
Capacity
Project
(LOSE)
a
ADTb
Lose
V/Cd
Scripps
Poway
Parkway

1. Tech
Center
Dr
to
Stowe
63,000
23,000
A

0.404
Dr

2. Stowe
Dr
to
General
63,000
21,330
A

0.374
Atomics
Way
Tech
Center
Drive

3. Scripps
Poway
Pkwy
to
22,000
15,130
D

0.841
Gregg
St
Stowe
Drive

4. Scripps
Poway
Pkwy
to
37,000
6,040
A

0.201
Kirkham
Way
f
General
Atomics
Way

5. Scripps
Poway
Pkwy
to
22,000
6,270
A

0.348
Kirkham
Way
Kirkham
Way

6. Tech
Center
Dr
to
Stowe
37,000
8,600
A

0.287
Dr

7. Stowe
Dr
to
General
37,000
5,050
A

0.168
Atomics
Way
Footnotes:
a.

Capacity
based
City
of
Poway
Roadway
Classification
Table
.
b. C. d. e. f.

Average
Daily
Traffic.

Level
of
Service
.

Volume
to
Capacity
.
f...
denotes
a Project-related
change
in
the
Volume
to
Capacity
(V/C)
ratio.

Roadway
segment
to
be
closed
under
Project
conditions.

LINSCOTT,
LAW
&

GREENSPAN,
engineers
13 of
29 30
Long-Term
+
Project
ADT
LOS
V/C
22,350
A

0.392
20,950
A

0.368
16,510
D

0.917
-
-
-
6,650
A

0.369
9,980
A

0.333
5,430
A

0.181
Substantial
Ae
Effect?
(0.012)
No
(0.006)
No

0.076
No
-
-

0.021
No

0.046
No

0.013
No
LLG
Ref.
3-21-3435
Stowe
Drive
Closure
Study
April 19, 2022, Item #11
It J, I
l • h
lJ5GS -. us:..-
I I
l
c-to e Dr Cto~m S 1
April 19, 2022, Item #11
Figl~ ,2 2
Project Area '1-11ap
Stowe Drive Clost1re Study
April 19, 2022, Item #11
0 ,"'ii I,® t"'il
~ rJ
t,
,!!
... ·1' ·i.. I : l Scri:f,t. I . ! -.
n
Pt.~·.dyPt.1•,·,
I .. i.

I
-I ... T"'
• I ., ' '
""'◄ ~
I
@ cl I'© lo
~
bi
... "-...
)',. -I _: ~ ~
I I • .· .... I _,
7 .... , ..
~
~-
II)
l
1,. 60 ssm..,h ~--
Q.
§
M
Q
N
··egg S1 (i)
c::
('.)
(.)
fj
.:.,
I-
© Kuknem Way ;fDc• 45mph
l<D
I©
I ..it.
9 J:!
Q
-8 .,.,
b •
(2
•'-· • I I { i
i ' ! I
rolectrsime
I

I I ' I
i ~ ,· I
i
6 ~
4g
I'-
.. i · ...
------~ G1tflil ~l
®
214/6
UIO
Study lntersection
Project Site
umber of Travel Lanes
Divided/Undivided Roadway
* Two-Way Left-Tum Median
35mph Posted Speed Um~
·#'\~~
r.,~o
cJJ·tl~
t0 rf.>~\"'(\
.. ~~'9'(,.
"t::l '{t~1
·r,~,;fi, .
·,~i':f.,
'.J
A
~
Figt~ 3 1
Ex~sti ng Conditions Diagram
Cl y
April 19, 2022, Item #11
(D ,-'i ® i,i,.
~te~ .!i ;;~;,; J --.. 4--.::! t~
~c:::;~ ~ \,_ •tl 117
'4'1:""-J-
"-56.i ;i -1.0-
) l ·~
.... _ 7:}5i'3~0
.... ~ I.~
-07'1.']04
,, 107 I ~1 ,,.• -U,'M
5:nµin P1:ot.11,• Pl11)• S11' µµJ Poway P~.I\"/
105.1 19 ··,. l ( 1)4 i'33 .I ·,1 r r
,%! g.14 479.' 'QE,.i .
18$! 41C< ~~!J 13.0,'1C ... ..,
'
.,,,..- ,.._.,-..,
-... ---- -.:-C"\..:.C
~~-
.r'lu"":,~'\
N
® 1a © I~ ~~
ij ~'"'-
_...,.
=·
i .. '·-1'.J 1'J,1
I
. ·-
I
'-21,'
.,,,.) '·, -?81' JOG ) l d6 ,'::'d
t(f1,;111rr w.,~
'1,143
I
36: Gl' _..• I "1 1 1.1161 -~ 2l-t • 131 -
1 .i O .._ '._=)C>
c
G tu u
;...
j
ro
CL
(.1) 19,460
C
~ ..,-
~
Grugg St .. ©
~
)
..2
5 ) ... ~horn Wai• 6,310
Tin
l<D
(D
I
;i5,1:n5
8 I 1
©
0 QI
..:
~

1..r.i
~-
~
I 1 I, .1 ....
;' 41) --~
:V,'N
2 i'6
'i'I Scripps Powav Pk,. H . . ,~
I
'
I
• I
\ I
l
I
I .,
070 f
I I'
Prdject . ,
Sit-I
' I
i"''
I',
-..:lts! 550
-17!31
~ 10., HJ
.....
·1
,-,Nie.;
;..;;ai
-N
G1~'1lij SI
® Study lnlersectiot
I II
x.xxx
,t..,'\~ ,-,.:J
ti,~ ~•4.,,
,-''1':,.?.<I;·'
\"1!•*''
Intersection AM/PM Peak Hour Volumes
Slreet Segrnenl ADT
Project Site
·'l
't.,,
;.,
':••
fe
'%
,,._, (IP
St
~ ..... '"-
~-~
.,
...-;
... :..
(J)
'l
A -...

FigL~ 3·.2
Existing Volumes
ive Closure Stuay
April 19, 2022, Item #11
0 ®
~<.3~
,;~~
I
,.(
111),•]5 -
{00.i 930 ..
190 I 4-21) •.
0 !:!
I~
~ '--45 uo '""" -74n,·~oo
u
r 1101'5$
Su,pr,s POOlldy Pl.i',''
~~~
o.;.:; o
:;!'.-.t'\'lof
~~ I~
~R;
;5.t E(j
2i'Oi 170
-"1J1'.C
eo 1' JJo
K~11irrWJ)'
ci
!:!!
C:
ti.I
c.;
>
J
l'0
a.
,J,J
0 ~ ..,; ....

GrCJgqSt(i)
~
t5
§
C.
1~
£
~
@
@
~~8
;:.:;;;;; ('I.,.__
··' • I. .•
16(! 1'4C _l
O!!.' aom-• 11
140, w ',

40.• j',(J
.:;JO I 14
"' ~~
~R
I 1.
:tJO -\,
1) K,kharn Way ,5
'i ',14 3~>\F1g11r~
IP. ~tl12022
Tirr.e· H~ P\I
C,
~
'5
!'l
(11
·---60 ,',4
Ba0/31(]
,,-4~ ,' 15
2~~
.;,:.;.;
(""•
··-25 t' ,oo 00 r' i
Kr,hnl'll1/AI'
19,510
6,540
(D
©
~~~
~~~
) l ',.
8·
I I
J0.1730 •
'"(10 -·
2~~
~~~
r•~~m'hrt/
c::

QJ
~
L~
I
' I
, -'
'
..
5,100 I I
I 11
Prdjec
sh~-.

J
' 'e
©
~~~
,.,.,. .,...,~
) ! l,,.
5 ··~~· :\.) i' /5
511 -~
6 ~ lJ
t~ \,_ ;221) i 551)
;:io,1 JS
I) I 1(1
-. • Grcirn 51
'1 ·"'
.,.,,...,
lfl("-.,ft,·'"·
t-"1-0~ .
®
I Ii'
x,xxx
Study lnl.ersection
Intersection A.M/PM Peak Hour Volumes
Street Segment ADT
1 Pm jed Si le
"'~ ,-..~~ ,,·,r,,.t/:'' I~'.,,!,:,
'l
·01.i
l~}
•:...
·~
', (fl"
►,,,.. ·...:
"% ~
~ti,_,
.. J,·.
(j)
'J
• ....

Fig~ 6-1
Near-Term without Project Traffic Volumes
Sto,Ne Drive Closure Study
April 19, 2022, Item #11
©
®
-!M.'-li,
!!4! b
..... ....
~
w
~
t"i
]
.(,,' . .jij
S:np~ Pc.11y Plw_
oof.~'
'"t:, ...
'· 21,·120

11.11.:1·111n•.\\
Ill
~ u
~
~
It!
a..
0 ©
-Mi'-..
~
r's
t,
0 ,._1'.n I j
f"'?"
l I ·" ....,

4.1 4,
ti3.' 1:, -►
-2;' ,I .. :J
Strpp~ P,:.,,•,.1y P►.v.·,
·, i f
~,f.~:~¥
"?~"'?
?~'
J!'")W')
1J / 1,J
1415
Kr•hain'fl.
©
©
-0/ ~12
r~
~
14? --·
•t.7 I .9
;· U.•·9
.irl s;=il~ P:rNa:; ~;..,.,
"' ~
;;r,
.rkl!nrn 'llrt1
0 ::u
~
~
~-t~I ----------
0 CIQ
~.
,..iru!-!qSt©
6 c
8 ©
~horn Wiry 1,380
I
I
ProjectlSit
l I
'
I ~ ,
I ·1
I
'i
©
~
~
,_
N
GrL'1JH ~i
®
111
x,xxx
Sludy lnlersection
Intersection AM/PM Pea.k Hour Volumes
Street Segment ADT
1 Project Site
n,\t •.-.:·
;J• ... ~ ..
,~it\'. ,+J,.•J,~,
<:•
\;•~-.
~,, -~
~ ~
%,:t,
,<j
.E ..
(j)
,,
A
It-
Fig~ 7-1
Project Traffic Volumes (Near-Term)
Stmve Drive Closure Stuay
April 19, 2022, Item #11
©
®
§7''" ;;:1::.::.;
110.' :i:i _.,
616.' 0?4
;U,1,t,1.t!6 ~.1
,r-,
,., ...... _
?5.1 f:(I
2/'0.1110 ..

I",
f
1J d.'.l 1' 20
734 I 'l:)L
111'.li'!l~
:.8N
H,'HiO
A(I 1' 330
\ft.hill' Wdy
·c
I!:!
u
m
a.
@
©
t"I
Bt.00 _ .... u,
6ro~ 1· •, GO .'40
'"' i .. 1180 ,, l 10
1b0 ,',
43~1 · Oi'\1-·
!;.61'4 --.
·t;,.i ?ff
2:fa.1 1!Jb
I l
5,10 -.,
0 j
11!,,''"
:11'pps ~-ay Pl.11·1
d(
M?~
'-10,
1 -40
i 2
.....
0 t---------1,'1).. 18.880 .........
0 ~
o,ri
..-
\,J :-t~ 4 '"'ran~ St©
5 6
J
~
~
-~ha,11 W· 7,920
<D
(D
%J'J1
01110
t!i
.,.llorn'll.r1
0 i.r.-
I
Proj
I,
I
•
•
Sit
I
·1
©
e·
~~ra . =
.I 1 I
.... ,.
35 11 75
5 i 1
....
u
i .. . 2:-10 .I 5J0
-20,,3ri

11.).11
, • G,~gy St
'1
:~r=:t:z
u;:,:;~
""
@
x_xxx
Sludy lnlersecti
Intersection.AM/PM Peak Hour Volumes
Street Se A men I AD T
, Project Si le
":!~ ,k~•~'\
' f"~: ...
,,,'•(','.~',
~~•"''
/~
,;.,,i:
i;J>
.)-.3
.... 1..

CD
,,
A
~
Fig~ 7 2
Near-Term+ Project Traffic Volumes
Stmve Drive Closure Study
April 19, 2022, Item #11
© t.'i @ i~
~~~ ~ §~fil J, " ~---#
r..)
----
~~•r> ] '-:(li'20
ROI("! ' -/'0,'40 -~ ... _Jl::(l1'1!.5(j
.,) . I,
-1,030 I 361)
~. ,! •JU,, tiO ...... JO,' :/0
S:,1pO'I Pl:.'3)' Plv.y S1:T11p1 Pow~)' Ph1;i
120., 2!> _} I ..... l r 1 fO •'•\O .,• ·., l (
ROD,' I OliO-•
~:]~
510 ,
1 • ?!iO ~
"ll),t,180 ,, Hi(.H 10
' ~~~ ~-...
~ii!~ ~~~~
® 6 @ Q
~~
.!l ,2~ ~~ (~
..r.,....,
fa ~~ M1N
I
I•,,_ "31'4.0
.) t ..
,_ ~,'1"3
,/ ..... ·-!l(J(360 ---5(),'270
Kit.hill! Wd,; K"ll8'11'1~'1
?51&1 _,• Fro.,9n J "", l 2':JD,11':ll>-+ 240/ 140 -+

5.t 0 -,, . ?~
.r,,n
d
e! i:

Ill
(.)
;>
~
~
Ill
a.. ... ) _j_,, 23,000
0 ~
iri .....

Gro~g Stf4l
'.._;.,I
a
2 c;
8,
-5
~
@ t\Ut.harn Way 8.600
©
~~~
~~~
I I !
,I i \~
110 .' !I .I f
;'!i01 U70-~
ttu ,1 ao --,. b
<IC
e
CD
§~
I ! ,., <.,.

J0.1 24C1 -
·i:)11''
r;
.§
'!-
~ "'--110 1"2D
-1160i"'HO
,, .. 140.t':iU
!:a1=f' P::r_, ~.,,_.,
""1 i ,.•
:i{~~
~~~~
~ '-10O.i 50
£-21}/ 10
Kr\t!orn 'l/'it1
c
' '
'
!
'I
6,MO I
I !'
ProJect
• r
Sjte i
'-... , e
© ~
~R~ I u
~;:;;~ i '-220.1550
) ! \..,
"'°..-20.1 ::,5
1· 11J.t1(1
-
.l ,,, • I' Grcyij SI
o ,'t,0
35,' 75 -
6 i' 10 --~ o.f!,~G~
y·;i~)J
'2'\,l'?i()
®
'1,,... I I
.x,xxx
,.._.....-L. _ __I
~~f§> ;'l,~\S
•,j;t,\,t:,,
-~~··
SI u dy In le rse ction
Intersection AM/PM Peak Hour Volumes
Slreet Segment ADT
Project Si le
~
·~ ~
'..,;
.-.,.,_
( 7'
'J
.. ....

FigLOO 9-1
Long-Term without Project Traffic Volumes
Stmve Drive Closure Study
April 19, 2022, Item #11
©
g
-
~
-Ub,1 -6 · ,··
@
~
l"i
..,
f.J
]
.f:i ;' ··,·
;.,;;
N
•._ 27 ,· B2
k.fthf.fT'Wd)'
0 V,
~
ci
!!!
c
Q.I
u
-t:
l'tl
Q.
1,.

G1u(:lq St©
cS
.!:. .:: Q,;1
t)
0 ©
,, L
(.!) " 1 :horn Way
..., ,,,
~
.. ~3 !' .. r, -~~
.,O! ~
ti9/ 18
N( .,..

C,
"?
) 1. ....

I
I~
:1
~~
(D
,··· .Ju" .1:.i
Sirpps Pcw.-ay Ph1·1
·., l (
~~~
;.1",q
©
··-113..1-P
1$,'
K.,.hamW;J'I
~::
tnu-;>
j740t
1,510
-31).1 -12
©
I°
~ ~ ., -.. u
~ 1
1· JD r 12
,(i i .. 1
,.,
~
i 21
,,wer,i'/1:11
•. 1 48 ....,.
c5
Q!
-~ L/)
21 Scripps Poway Pk
r ~
I
I
t
' I
Proje~Sit
' i
I, I
I I'
j ' 1. I
I ·1
I
e
,..

N
Grcyg ~I
~4.;.G't
~
'·JV
x,xxx
Study Intersection
Intersection AM/PM Peak Hour Volumes
Slreet Segment ADT
1 Project Site
,>'l:i ,~·.S,., .,,
,11,.-<;,,'o''
~··
a(.?
:t
'"'.s•
~.
~~
~I,"'
✓,
I~
'\J
A
'to-
Fig~9 2
Project Traffic Vol;umes (Long-Term)
Stowe Drive Closure Study
April 19, 2022, Item #11
©
~80 -...-"'"
~~•n
I l \.
@
~!j.J
w~~
\.
t5! 00
~'90 ·' 190 ...

I
~
~ ...
!..)
] '··-:£l ,·20 ..... 844 ,' %"3
, 13U .'tiO
Q
.ii
.~ I\ 1 •. '1T ,· 1l?
·-f!O ,· 360
---t(f1,;fl'll' Wt1v
C
~
t:

QJ
(,)
ill
~
11!
CL
0 ©
~
§~iE u~
Rre~
... ' • l..
1·m ,•.io .,.
5101' ;'60-•
,'4 -...

II
c
m.-.. N.-j
-~~
l I
.. ✓ '
,o I lfi . .J
JU9.11::i8 - 5,10 -.,
<D $ ©
~~~ 2 e:-.R~ '! ... _ ..._ ~--... -... '"'·-
•._ 10140 S?s:;::;<;? ~ '-2l0.•2ll ~~~
•-1.030 .' 360
I l ' -1.-1J0t29a ) l '•,., , .. 20.' B ,,,, "'·· ~r 1/0/6.! Sc,,pps PoY.-.y P►.11·,
110 I!> .If
Sa~µs P:r,y;e·1 i:+.-N)
·., i ( ', l t· 0 i'~I, .I
244, 1.,n-~ :!.5 ,' 75 -·
:=:l~~ 110.'liO --.... ij ~~~ 5i10 ---~
;.;i; "' ~~~
]
CD
'" ,t')
~~
' 1,148 Ii '--1QOJ . €,'i ,'276 ) ~ .. UI.--21)11
Knhll"l'l'li.v
) i ]6.1 JR ... -
,o 11
0 C
a
a.I
-~ i.r.,
. 1) 22,350 ri'\ Scripps Poway Pky '....;.,, .....,z,-
·,uwi
~
lltll
~
t©
6 .!:.. C
(~;
C-
~
0 ,~(i;kharn Vt.'
tl ',l43!!>',t-1g11r~
31P. 1tl12(1'2
Time· 515 PM
~ .
' p USit
9,980 ·1
e
Ir..
,i,_;,
1 ;·
Gn:{ly ~
~,,
..r>0~ -.... _ -- ,.,a~C'J
M
10,9':i()
®
11(
x.xxx
Study lnlarsectio
Intersection AM/PM Peak Hour Volumes
Street Segmenl. ADT
, Project Si re
, .... ")~ ~\~ '°), •~,i
,,;_,,~?;,'1;0 't-.~' ,.
~-
'\,
~
~~ ~
t·h
.(,
r. 7
'J
..
i..,
.M
FtgLN 9.3
Long•Term + Project Traffic Volumes
Sto1.ve Drive Closure Stuay
April 19, 2022, Item #11
---
<D
1 /0 ·-►
c.:i
"' 0
~t. 1/0
ScripP.S Pow,1y Pkwy
(
u
-"'
~
::
@
2/0 ·-►
0 ~
ci)
1 /0
Scripps Poway Pkwy
I
0 j
N
0 '-1 /0
©~i I©
·--~--
3/ 1 ····►
■
.
'

IHIHIIIP
Kirkham Way
3 / 1
® Kirkham Way
N:13435\Figure
Date: 12/13/2021
Time: 10:18AM
Maxar
Kirkham Way
(D in
S;
:~
c':3
1 / 0
f IScripP.s Poway Pkwy
-~ (
~ C)
~
~
(.:)
<v~t
't3
E
~9 .,:
1 ~
lf6 _j
Kirkham Way
© 0
B a; u
.c
.~
Gregg St
®
"'1i(
[_-_ -_!
~'3-~
-f..,~~"''3-~
Study Intersection
Intersection Bicycle AM/PM Peak Hour Volumes
Project Site
Bike Lane (Class 11)
(j)
N
~
FigureS12-1
Bicycle Network
Stowe Drive Closure Study
April 19, 2022, Item #11
(D
I
0 ~$
~(~
----1/0
11111 1/0
= c:11□ =s: ---= t:ti■ = Scripps
I Poway kwy
®
11111
"'t
ci
~
t'3
.c
0 ~
1/0
Kirkham Way
I
CD
11111 1/0
-=~-1-i =_________L
: I !tiU =~
©
I Poway Pkwy
11111
"'t
ci
~
~
Kirkham Way
® Kirkham Way
N:13435\Figure
Date: 12/13/2021
Time: 12:49 PM
Maxar
0 Ii -~
Cl
11111 113 I _
-+-a - ---~-=-: Scripps
- I Poway Pkwy
(D
111111 l
~Xl
~~
('.) <(
-il
i
·G
0/2 j
1/2 11111
-+=•I•= ---- = 0 I ~ = Kirkham Way
©
I
0 "' ]~
----"4
11111
I
-~-a-11~
I
11111 1/0
I
®•1~e,~, c,,,.,,, I i
11111
32/2
~~~
~~'f_'r;,~~
@
11111
Study Intersection
ADA Tactile Paving
Standard Crosswalk
High Visibility Crosswalk
Missing Sidewalk
Intersection AM/PM Peak Hour Pedestrian Volumes
~
~
~
"% %.

U'~
~
N
Figur~2-2
Pedestrian Network
Stowe Drive Closure Study
April 19, 2022, Item #11
~
~,2_~ . .B~~
Print Date:
'317/2022
Mid-block Crosswalk Locations
Map Scale:
1:2,257
Oiscla n,e26aof;ctl~el data are beieved to be accurate. but accuracy is not guara.AJiJ--ACJ,IM~~Tc~ent and shouk:I not be substluted for a title search, appraisal, survey, or for zoning verifcation.

April 19, 2022, Item #11
APN 3230923900
APN 3230924000
..

APN 3230923500 :J
April 19, 2022, Item #11
l'
.. -
I .,
.
:/
/
-
I
_,
I
,
I
I
I
/
I•
/
r
,, -~
*,,,:
,
.
'
:
/ ., ,,
-
I I
I
I I
l
.,..,
I
/
I/,✓
-~,
/
I
I I
I
.
·/ I '
,
/
/
1 .

I I I
I
.,
April 19, 2022, Item #11

AGREEMENT
OF

UNDERSTANDING
City
Council
for
the
City
of
Poway,
hereinafter
referred
to
as
"City"
and
General
Atomics
Aeronautical
Systems
Inc.
, hereinafter
referred
to
as
"Proponent"
enter
into
this
Agreement
of
Understanding
based
upon
the
following
facts:

Proponent
owns
or
has
an
equitable
interest
in
land
described
by
tax
Assessor's
Parcel
Number(s)
APN
3230923900,
and
adjacent
.

Proponent
desires
to
develop this
property
in
accordance
with
the
will
of
the
City
and
without
the
expense
of
a
protracted
development.

City
is
concerned
that
Proponent
will
create
development
plans
unsatisfactory
to
City
and
consume
time
and
effort
of
City
employees
needlessly
on
unsatisfactory
development
plans
unless
City
assists
in
directing
Proponent.

Based
upon
the
above­
mentioned
facts,
City
will
grant
Proponent
a
hearing
prior
to
filing
any
application
for
development
upon
the
following
understanding:
a.

City
will
render
no
decision
with
regards
to
any
development
proposal
or
part
thereof.
b.

City
will
receive
no
evidence,
specific
in
nature,
in
support
of
a
particular
development
plan.
c.

City
will
make
no
representations
that
will
obligate
the
City
to
render
a
decision
in
favor
of
or
against
any
development
proposal
or
part
thereof
Proponent
may
subsequently
submit.
d.

If
any
development
proposal
is
subsequently
submitted,
Proponent
will
proceed
at
its
sole
and
exclusive
risk
with
the
understanding
that
City
has
made
no
representations
upon
which
Proponent
may
rely.

Dated:
02/10/2022
Proponent:

Signature
29 of
29 ATTACHMENT
F