Request Approval of the Amendment to the Agreement with IEC and
Approval of the Consultant Agreement with Butier Engineering May 16, 2023

Clearwell
Replacement Project
Treated Water
Facilities Projects
Water Infrastructure Improvement Program Components
Clearwell
Bypass Project

Clearwell Replacement Project
Replace the existing Clearwell floating cover structure with two concrete tanks Replace the original inlet, outlet and drain valves
Removal of the temporary bypass facilities and restoration of the softball field Status:
Design: Completed
Advertisement for Bids: May 11, 2023
Construction Start: Fall 2023
Construction Completion: Fall 2025

Total amount: $303,490
Summary of scope of services:
Review shop drawings, submittals and RFIs
Provide design clarifications and redesigns as-needed
Prepare Record Drawings
Provide inspection of the structural elements:
Footing
Columns
Circumferential prestressing
Wall sections
Approval of the Second Amendment to the Agreement with Infrastructure Engineering Corporation (IEC) for Engineering Services During the Bid and Construction Phases of the Clearwell Replacement Project

Total amount: $2,641,012
RFP posted: December 1, 2022
Six proposals received on February 1, 2023:
Butier Engineering
Capo Project Group
Dudek
Hoch Consulting
Kennedy/Jenks Consultants
Lee + Ro Engineers
Fee proposals: $1.9M to $3.8M
Interviews: March 22, 2023
Approval of the Consultant Agreement with Butier Engineering for Construction Management and Inspection Services of the Clearwell Replacement Project; RFP 23-010