Award of Construction Contract to Gateway Pacific Contractors, Inc. for the Clearwell Replacement Project;Approval of Agreement with United Guard Services, Inc. for Security ServicesandAppropriation of Water Revenue Bonds, Series 2023A ProceedsSeptember 19, 2023

Provide safe and reliable water service to Poway residents today and for generations to comeImprove resiliency of Poway’s water supplyDiversify the City’s water supply portfolioImprove redundancy and operational flexibilitySatisfy requirements of the mutual agreement with the State Water Resources Control Board, Division of Drinking Water (DDW)Water Infrastructure Improvement Program Goals

Clearwell Replacement ProjectClearwell Replacement ProjectTreated Water Facilities ProjectsTreated Water Facilities ProjectsWater Infrastructure Improvement Program ComponentsClearwell Bypass ProjectClearwell Bypass Project

Replacement of the existing clearwell floating cover structure with two 4 million‐gallon prestressed concrete tanks Site grading; retaining walls; biofiltration basins; storm drain pipe relocations; inlet, outlet and overflow piping; vaults and other appurtenancesRemoval of the temporary bypass facilities and restoration of the softball fieldEngineer’s Construction Estimate:  $30M‐$35MApparent Low Bidder:  Gateway Pacific Contractors; $31,646,023Status:Advertisement for bids: 5/11/2023Bid opening:  6/15/2023Award of contract:  9/19/2023Construction Start:  Fall 2023Completion and commissioning of clearwell tanks:  Early Spring 2026Construction completion and restoration of softball field:  Fall 2026Clearwell Replacement Project

Ensure security and safety at Public Works Maintenance and Operations FacilityQuotes were received from United Guard Services, Inc., ASAP Security and City‐Wide Protection ServicesUnited Guard Services, Inc. has been selected based on qualifications and experienceAgreement amount:  $23.75 per hour; Approximately $148,200.00Security Services for Public Works Maintenance and Operations Facility

August 15, 2023; City Council and Public Financing Authority Board of Directors authorized issuance of Water Revenue Bonds, Series 2023AAugust 27, 2023; Bonds were sold September 15, 2023; Transaction closed and funding was providedAppropriation of Water Revenue Bonds, Series 2023A proceeds in the amount of $37.6M to the Clearwell Replacement ProjectAppropriation of Water Revenue Bonds, Series 2023A proceeds in the amount of $500,000 to the Treated Water Facilities ProjectsAppropriation of Water Revenue Bonds, Series 2023A Proceeds