Item 5 - CUP20-006 & MDRA20-017 Request to Construct & Operate a WCF in the Creekside Plaza Shopping Center at 13573 Poway Road within CG District of the PRSP

Poway City Council
February 20, 2024

Document
Item 5 - CUP20-006 & MDRA20-017 Request to Construct & Operate a WCF in the Creekside Plaza Shopping Center at 13573 Poway Road within CG District of the PRSP
Meeting
February 20, 2024
Body
Poway City Council
Pages
8
Original file
43 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

February 20, 2024, Item #5
DATE:

TO:

FROM:

CONTACT:

SUBJECT:

Summary:

AGENDA RE PO RT City of Poway
February 20, 2024
Honorable Mayor and Members of the City Councj JA
Robert Manis, Director of D~vylopment Services J/Vl,
Stan Donn, City Planner C,(5t
858-668-4604 or [email protected]

CITY COUNCIL
Conditional Use Permit (CUP) 20-006/Minor Development Review Application (MDRA) 20-017, a request to construct and operate a wireless communication facility in the Creekside Plaza shopping center located at 13573 Poway Road, within the Commercial General district of the Poway Road Specific Plan and determination the project is exempt from CEQA review.

Verizon Wireless (Verizon) is requesting approval of a Conditional Use Permit (CUP) and Minor Development Review Application (MDRA) to construct and operate a Wireless Communication Facility (WCF) in the Creekside Plaza shopping center located at 13573 Poway Road, within the Commercial General (CG) district of the Poway Road Specific Plan (PRSP). The WCF consists of twelve (12) antennas and six (6) Remote Radio Units (RRUs) that would be concealed inside three (3) architectural faux chimney elements on the roof of a commercial building at the southeast corner of the shopping center. The proposal also includes a new equipment enclosure to be located at ground level within the parking lot. The project has been designed to comply with the City's development standards.

Recommended Action:

It is recommended the City Council take public input, close the public hearing, and adopt the Resolution (Attachment A) approving CUP20-006 and MDRA20-017.

Discussion:

The applicant, PlanCom is processing the CUP application on behalf of Verizon, and the property owner is ROIC Creekside Plaza LLC. The subject parcel is part of the Creekside Plaza shopping center located on the south side of Poway Road, east of Community Road and west of Midland Road, in the CG district of the PRSP (Attachment B). Surrounding land use includes single-family homes to the south, single-family homes and Toyota of Poway to the east, Fire Station 1 and the Poway Plaza shopping center to the west, and the Poway Town and Country and Midland shopping centers to the north.

The Creekside Plaza shopping center consists of eight parcels that are developed with a mix of single­ tenant and multi-tenant buildings. The proposed WCF is located at the multi-tenant building located 1 of20
February 20, 2024, Item #5
at the southeastern portion of the shopping center as shown on the site plan (Attachment C). The WCF consists of twelve (12) roof-mounted antennas, six (6) roof-mounted RR Us, at-grade equipment cabinets, and a diesel generator. The antennas and RRUs are proposed to be distributed evenly over three (3) sectors and placed inside three 35-foot-high, 8-foot-wide, rectangular faux chimney elements (Attachment D). There are currently five (5) faux chimney elements on the subject commercial building. Two (2) of the existing chimneys would be widened from 6 feet to 8 feet and increased in height from 30 feet to 35 feet to accommodate two (2) of the proposed antennas sectors. A new identical faux chimney would be constructed towards the rear (southerly portion) of the building to house the third sector of the WFC to improve the overall coverage of the antenna facility. The modified and new chimneys would meet the 35-foot height limit of the CG district of the PRSP. The equipment cabinets and diesel generator are proposed to be located at grade level within a new block wall enclosure that would be textured with stucco to match the existing buildings. The enclosure would be located in an existing landscape planter to the east of the commercial building.

The proposed WCF is in compliance with the City's wireless communications policy in that it is proposed on an existing commercial structure using a design that would be architecturally integrated with the existing structure and therefore would be minimally visually noticeable to the surrounding development as shown in the photo simulations (Attachment E). The antennas and other roof equipment would not be visible from streets and parking lots because of its stealth design. The antenna facility would also be consistent with the same faux chimney stealth design of two (2) other wireless facilities (T-Mobile and Sprint/Nextell) currently located within Creekside Plaza. The existing facilities are located on the westerly multi-tenant building along Community Road and addressed 13413-13425 Poway Road.

The City Wireless Communication Policy adopted in September 2004 provides guidelines for the application process of a WCF. Per Chapter 17.22.020 of the Poway Municipal Code (PMC) the approval of a CUP is required to operate a WCF in the PF zone. The findings for a CUP are specified in PMC Section 17.48.070 and provided in Section 2 of the attached resolution. The proposed project is in compliance with the City Wireless Communications Policy in that the proposed project has been designed to visually blend in with the surroundings and therefore would be minimally noticeable to the surrounding development.

Radio Frequency (RF) Report
A RF report was prepared and included with the application. It demonstrates that the proposed facility will operate in compliance with Federal Communications Commission (FCC) standards. The facility will be required to comply with FCC operational standards, and standard conditions of approval are recommended for the project pertaining to the following:

A Confirming Radio Frequency (RF) Report is to be completed and submitted to the City by the applicant after the antennas are installed to verify operations are in compliance with FCC standards.

An independent third-party review to verify the Confirming RF Report findings may be conducted at the applicant's expense as determined by the Director of Development Services.

Environmental Review:

The project is categorically exempt from the California Environmental Quality Act (CEQA), as Class 3 Categorical Exemption, pursuant to Section 15303(d) of the CEQA Guidelines, which exempts new construction and conversion of small structures.
2 of20
February 20, 2024, Item #5
Fiscal
Impact:

None. Public
Notification:

A
Notice
of
Public
Hearing was
published
in
the
Poway
News
Chieftain
on
February
8,
2024.

A
public
notice
was
mailed
to
property
owners
and
occupants
located
within
500
feet
of
the
project
site.

Attachments: A.

Resolution
B.

Zoning
and
Location
Map
C.

Site
Plan
D.

Building
Elevations
E.

Photo
Simulations
Reviewed/Approved
By
:

Assistant
City
Manager
3 of
20 Reviewed
By:

Alan
Fenstermacher
City
Attorney
Approved
By
:

Ce.
~
City
Manager
February 20, 2024, Item #5
RESOLUTION NO. 24-

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

POWAY, CALIFORNIA, APPROVING CONDITIONAL USE
PERMIT (CUP) 20-006 AND MINOR DEVELOPMENT REVIEW
APPLICATION (MORA) 20-017 FOR THE CONSTRUCTION OF A
WIRELESS COMMUNICATION FACILITY; ASSESSOR PARCEL
NUMBER 317-820-05
WHEREAS, Conditional Use Permit (CUP) 20-006 and Minor Development Review Application (MORA) 20-017, submitted by PlanCom (Applicant) and ROIG Creekside Plaza, LLC (Owner), request approval to construct and operate a Wireless Communication Facility (WCF) in the Creekside Plaza shopping center located at 13573 Poway Road within the Commercial General (CG) district of the Poway Road Specific Plan (PRSP). The WCF will be operated by Verizon and will consist of (1) 12 antennas and six Remote Radio Units (RRUs) concealed inside three faux chimney elements on the roof of a commercial building and (2) a new enclosure with equipment cabinets and a generator located within the adjacent parking lot; WHEREAS, on February 20, 2024, the City Council held a duly advertised public hearing to solicit comments from the public, both for and against, relative to this application; WHEREAS, the City Council has read and considered the agenda report for the proposed project, including attachments, and has considered other evidence presented at the public hearing; and
WHEREAS, the Poway Municipal Code (PMC) establishes findings required for granting a CUP.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway as follows:

SECTION 1: The project is categorically exempt from the California Environmental Quality Act (CEQA), as Class 3 Categorical Exemption, pursuant to Section 15303(d) of the CEQA Guidelines, which exempts new construction and conversion of small structures. This project involves the installation of a small new telecommunications facility which will provide a utility extension to serve the surrounding area.

SECTION 2: The findings, pursuant to Section 17.48.070 of the PMC, to approve CUP20-006 to allow the construction of a wireless telecommunication facility, are made as follows:

A. The location, size, design, and operating characteristics of the proposed WCF are in accordance with the title and purpose of PMC Chapter 17.48 (CUP Regulations), the General Plan, and the development policies and standards of the City, including, but not limited to, the City Wireless Communications Policy in that the proposed WCF complies with the development standards for the CG district of the PRSP. The antennas and RRUs will be concealed within faux chimneys on an existing commercial building that already has faux chimneys. The equipment cabinets and diesel generator will be hidden from view by an equipment enclosure. No visual impacts to the community are anticipated. 4 of 20 ATTACHMENT A
February 20, 2024, Item #5
Resolution No. 24-

Page 2 ends

B. The location, size, design, and operating characteristics of the proposed WCF will be compatible with and will not adversely affect or be materially detrimental to, adjacent uses, people, buildings, structures, or natural resources. The proposed WCF complies with the development standards for the CG district of the PRSP and will comply with Federal Communications Commission (FCC) design and operational standards. The antennas and RRUs will be hidden from view within three faux chimney elements on the roof of an existing commercial building. The exposed mounting hardware and cable will be screened from view by the existing building parapet. The faux chimney will be 35-feet in height and will be of comparable height to other WCFs located on the same property.

C. The proposed WCF is in harmony with the scale, bulk, coverage, and density of, and is consistent with adjacent uses in that the antennas will be screened within architectural elements in a similar manner to other existing WCFs in the shopping center and meets the maximum height limit allowed in the CG district of the PRSP. The equipment cabinets and diesel generator will be hidden from view by an equipment enclosure with stucco walls that will match the walls of the adjacent commercial buildings.

D. There are adequate public facilities, services, and utilities available at the subject site to serve the proposed WCF.

E. There will not be a harmful effect upon the desirable neighborhood characteristics in that the proposed WCF will be screened from view using a faux chimney stealth design feature that already exists at several locations within the shopping center, and the WCF will comply with FCC design and operational standards.

F. The generation of traffic will not adversely impact the capacity and physical character of the surrounding streets and/or the Circulation Element of the General Plan in that the proposed WCF will be unmanned and will only require periodic maintenance, thereby generating minimal traffic.

G. The site is suitable for the type and intensity of use or development that is proposed in that the proposed WCF complies with all development standards for the CG district of the PRSP and will enhance telecommunications coverage in the City with no significant visual impacts.

H. There will not be significant harmful effects upon environmental quality and natural resources in that the proposed WCF will be located in an area of a property that is fully developed with a commercial shopping center and does not involve the removal of natural habitat resources.

I. There are no relevant negative impacts associated with the proposed modified WCF that cannot be mitigated in that the facility will comply with FCC design and operational standards.

J. That the impacts, as described in subsections A through I of this Section, and the proposed location, size, design, and operating characteristics of the proposed WCF will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity, nor be contrary to the adopted General Plan in that the proposed WCF will meet all development standards for the CG district of the PRSP, will visually blend in with existing shopping center, and will comply with FCC design and operational standards.
5 of 20
February 20, 2024, Item #5
Resolution No. 24-

Page 3 ends

K. The proposed conditional use will comply with all the applicable provisions of this Title, in that the facility is a conditionally permitted use and has been designed and sited such that it will not result in significant visual impacts and will comply with FCC design and operational standards.

SECTION 3: The findings for MDRA20-017, in accordance with the Poway Municipal Code (PMC) 17.52.010 Purpose of Development Review, are made as follows:

A. The project has been designed to be architecturally compatible with surrounding development by utilizing faux chimney elements that already exist within the shopping center. The at-grade equipment cabinets and diesel generator will be located in the parking lot within a proposed equipment enclosure with stucco walls that match the walls of the adjacent commercial buildings. Therefore, the project respects and recognizes the interdependence of land values and aesthetics to the benefit of the City.

B. The project has been designed to minimize impacts on surrounding development by concealing the antennas and RRUs within faux chimney elements and screening the view of equipment and generator within a solid wall equipment enclosure in a manner that incorporates existing architectural elements, materials, and colors within the shopping center. Therefore, the proposed development respects the public concerns for the aesthetics of development and encourages the orderly and harmonious appearance of structures and property within the City.

C. The granting of the MORA would not be materially detrimental to the public health, safety or welfare within the community since the WCF will comply with FCC design and operational standards and City standards.

D. The design and improvements of the proposed development are consistent with all elements of the Poway General Plan. The stealth design is consistent with the City Wireless Communications Policy and the proposed WCF complies with the development standards for the CG district of the PRSP.

SECTION 4: The City Council hereby approves CUP20-006 and MDRA20-017, as shown on the approved.plans incorporated herein by reference and on file in the Development Services Department, except as noted herein, subject to the following conditions:

A. The applicant shall defend, indemnify, and hold harmless the City, its agents, officers, and employees from any and all claims, actions, proceedings, damages, judgments, or costs, including attorney's fees, against the City or its agents, officers, or employees, relating to the issuance of this permit, including, but not limited to, any action to attack, set aside, void, challenge, or annul this development approval and any environmental document or decision. The City may elect to conduct its own defense, participate in its own defense, or obtain independent legal counsel in defense of any claim related to this indemnification.

In the event of such election, applicant shall pay all of the costs related thereto, including without limitation reasonable attorney's fees and costs. In the event of a disagreement between the City and applicant regarding litigation issues, the City shall have the authority to control the litigation and make litigation related decisions, including, but not limited to, settlement or other disposition of the matter. However, the applicant shall not be required to pay or perform any settlement unless such settlement is approved by applicant. 6 of 20
February 20, 2024, Item #5
Resolution No. 24-

Page 4 ends

B. Approval of this CUP request shall apply only to the subject project and shall not waive compliance with all sections of the Zoning Ordinance and all other applicable City Ordinances in effect at the time of Building Permit issuance. This CUP approval shall be in substantial conformance with the approved plans.

C. Within 30 days of the date of this approval, and before the issuance of any permit: (1) the applicant shall submit in writing that all conditions of approval have been read and understood; and (2) the property owner shall execute a Covenant Regarding Real Property. In order for the City to prepare the Covenant the applicant must first submit a legal description of the subject site.

D. The use conditionally granted by this approval shall not be conducted in such a manner as to interfere with the reasonable use and enjoyment of surrounding uses.

E. The conditions of CUP20-006 and MDRA20-017 shall remain in effect for the life of the subject use and shall run with the land and be binding upon future owners, successors, heirs, and transferees of the current property owner.

F. CUP20-006 and MDRA20-017 may be subject to annual review, as determined by the Director of Development Services, for compliance with the conditions of approval and to address unresolved operational concerns that may have been raised during the prior year.

G. The applicant shall obtain a Building Permit prior to work commencing. Prior to issuance of a Building Permit, the applicant shall comply with the following:
7 of 20

1. The site shall be developed in substantial accordance with the approved plans on file in the Development Services Department and the conditions contained herein. A final inspection from the appropriate City departments will be required.

2. A $3,000 deposit shall be submitted to the Development Services Department to ensure completion and submittal of the required Confirming Radio Frequency (RF) Report, as specified in condition of approval 1.1 below. The deposit shall also be used to cover the cost of an independent consultant to review the report, as determined by the Director of Development Services.

3. The antennas shall not be activated for use until the Building Division conducts a final inspection of the proposed structures and finals the permit.

4. The equipment enclosure shall screen from view the equipment cabinets, generator and other appurtenances. The building plans shall show the enclosure to be constructed using decorative block, such as split face, or stucco. The gate to the enclosure shall be solid and shall consist of metal or wood to the satisfaction of the Director of Development Services. The color of the enclosure shall complement the shopping center to the satisfaction of the Director of Development Services.

5. Landscape and irrigation plans shall be submitted and approved for modification of the planter that will contain the equipment enclosure. Landscape and irrigation plans shall demonstrate compliance with the City of Poway Landscape and Irrigation Design Manual, Chapter 17.41 of the PMC, and all other applicable standards in effect at the time of landscape and irrigation plan check submittal. This includes but is not limited to the submittal of an irrigation audit report, pursuant to Section 17.41.11 O of the PMC, prior to final inspections.

February 20, 2024, Item #5
Resolution No. 24-

Page 5 ends

The landscape and irrigation plan submittal is separate from other project plan check submittals and is made directly to the Planning Division. Contact the Planning Division for copies of applicable City standards, the landscape and irrigation plan submittal checklist and the plan review fee worksheet. Landscape and irrigation plan review fees are required and are the responsibility of the applicant.

The plans shall incorporate the following requirements:
a. Installation of tall shrubs, small trees, and/or vines in the landscape planter along the enclosure to soften the appearance of the enclosure walls. b. The existing landscaping planter located in the southeast corner of the center between the commercial building and Midland Road and south of the driveway, and within which the enclosure is located, shall be augmented and/or replanted with shrubs to ensure that the landscaping along the entrance to the shopping center has a thriving appearance.
c. The plan shall demonstrate that the placement of the enclosure will not negatively impact the existing irrigation serving the planter in southeast corner of the center between the commercial building and Midland Road.

6. Since the floodway line clips the corner of the structure, a floodplain development permit will be required prior to issuance of building permit.

7. The applicant shall incorporate Low Impact Development (LID) design features into the site development. These shall be clearly shown and identified on the site plan and be appropriately sized for the proposed level of development.

8. Erosion control deposit and stormwater inspection fee will be required prior to building permit issuance.

9. The applicant shall attend a pre-construction meeting at the Department of Development Services. The scheduling request shall be submitted on a City standard form found at https://poway.org/DocumentCenterNiew/10254/Preconstruction­ Meeting-Request-Fillable?bidld= along with three copies of the approved site and erosion control plan. The applicant's action plan that identifies measures to be implemented during construction to address erosion, sediment and pollution control will be discussed. Compliance for sediment control shall be provided as directed by the project inspector.

10. The Standard Storm Water Quality Management Plan must be completed and submitted prior to building permit issuance.

H. Prior to activation of the antennas, the applicant shall comply with the following:
8 of 20

1. The site shall be developed in substantial accordance with the approved plans on file in the Development Services Department stamped as "Exhibit A" and the conditions contained herein. A final inspection from appropriate City departments will be required.

February 20, 2024, Item #5
Resolution No. 24-

Page 6 ends

2. Landscape and irrigation shall be installed and maintained in accordance with the approved landscape and irrigation plans on file with the City of Poway Planning Division. All landscaping shall be maintained in a thriving condition.

3. The site shall be cleared of all construction materials, supplies, and equipment.

4. All existing and proposed utilities or extension of utilities required to serve the project shall be installed underground. No extension of overhead utilities shall be permitted.

5. All utility services shall be installed and completed by the property owner and inspected and approved by the Engineering Inspector.

6. The drainage facilities, driveway, slope planting measures, and all utility services shall be installed, and completed by the property owner, and inspected by the Engineering Inspector for approval.

7. An adequate drainage system around the new building pad capable of handling and disposing of all surface water shall be provided to the satisfaction of the Engineering Inspector.

8. The applicant shall repair, to the satisfaction of the City Engineer, any and all damages to public improvements caused by construction activity from this project.

I. Upon establishment of the WCF, pursuant to CUP20-006, the following shall apply:
9 of 20

1. Within 30 days of the commencement of operation of the antennas, the operator shall submit a report, prepared by a qualified professional, which specifies the actual RF levels within 500 feet of the facility and includes a statement as to compliance with the FCC Maximum Possible Exposure (MPE) limit. The format of this report shall conform to City requirements. The intent of the report is to measure exposure levels at the location after the facility is in operation and shall include the cumulative RF levels of all the telecommunications facilities at the subject site. A report of these measurements, and the engineer's findings with respect to compliance with MPE limits, shall be submitted to the Director of Development Services.

If that analysis determines the MPE levels are exceeded, the operator shall cease operation immediately. Modifications shall be made to the facility and the operator shall conduct a second confirming RF report of the MPE levels. Full operation of the WCF shall not be allowed until the Director of Development Services has determined that the facility is in compliance with Federal guidelines. The City may conduct an independent verification of the results of the analysis provided by the operator, at the operator's cost.

Upon demonstration, to the satisfaction of the Development Services Department, that the telecommunications installation is in compliance with all Federal Guidelines, any balance remaining from the security deposit shall be refunded to the applicant, upon written request by the applicant.

2. All facilities and related equipment shall be maintained in good repair. Any damage from any cause including wear and tear shall be repaired as soon as reasonably possible so as to minimize occurrences of dangerous conditions or visual blight.

February 20, 2024, Item #5
Resolution No. 24-

Page 7 ends

3. The facility shall be operated in such a manner as to minimize any possible disruption caused by noise. Backup generators shall only be operated during periods of power outages, and shall not be tested on weekends or holidays, or between the hours of 10:00 p.m. and 7:00 a.m. on any night. At no time shall equipment noise from any source exceed the noise standards contained in the PMC.

4. The owner or operator of the WCF shall routinely and regularly inspect the site, including, but not limited to, the landscaping in the vicinity of the enclosure, to ensure compliance with the standards set forth in this permit.

5. The operator of the WCF shall be strictly liable for interference caused by the WCF with City telecommunications systems or other public agency emergency communication systems. The operator shall stop operations and determine the cause prior to restarting the facility. The operator shall be responsible for all labor and equipment costs for determining the source of the interference, all costs associated with eliminating the interference (including, but not limited to, filtering, installing cavities, installing directional antennas, powering down systems, and engineering analysis), and all costs arising from third-party claims against the City attributable to the interference.

6. The WCF shall not be operated in such a manner that it poses, either by itself or in combination with other such facilities, a potential threat to public health. To that end, no facility or combination of facilities shall produce, at any time, power densities within 500 feet of the WCF that exceed the FCC's MPE limits for electric and magnetic field strength and power densities for transmitters, or any more restrictive standard subsequently adopted or promulgated by the City, County, State of California, or the Federal government.

7. If there is any change in the operating characteristics of the WCF, a report pursuant to Condition 1.1 of this Resolution shall be submitted to the Director of Development Services for review and approval. The Director may also require the operator to prepare an updated RF report, and pay for a third-party review of that report, as part of any review of this CUP.

8. Any service light(s) shall only be operated when maintenance is being performed on the equipment. The service light(s) shall be adequately shielded and directed away from adjacent roadways.

9. The owner of the WCF shall remove all of the communication equipment, and associated structures, approved pursuant to this permit within 60 days of ceasing operation of the telecommunications facility.

J. The following requirements shall be completed to the satisfaction of the Fire Department:

1. Installation and operation shall comply with the 2022 CA Fire Code.

2. Fire department access shall be maintained.

SECTION 5: The approval of CUP20-006/MDRA20-017 shall expire on February 20, 2026, at 5:00 p.m., unless prior to that time, construction on the property in reliance on the CUP/MORA approval has commenced.
10 of 20
February 20, 2024, Item #5
Resolution No. 24-

Page 8 ends

SECTION 6: The parties are hereby informed that the time within which judicial review of this decision must be sought is governed by Section 1094.6 of the California Code of Civil Procedure.

PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Poway, California on the 20th day of February 2024 by the following vote, to wit:

AYES:

NOES:

ABSTAINED:

ABSENT:

DISQUALIFIED:

Steve Vaus, Mayor
ATTEST:

Carrie Gallagher, CMC, City Clerk
11 of 20
February 20, 2024, Item #5
RA
1--.l._RA
TC
MU
TC
i-----.1..---------Poway·Rd---':!"""-------_J
---r---r----,--------~ r---r----,--.--~---------
"tJ
er
-~ C: .:,
E
E
0 I__J!---------' (.)
PF
RS-1
Dana Vista
MHP
a..

Q
Cl)
·= .s
~
12 of 20
Subject Location:

APN 317-820-05
PR-CG
RA OS
City of Poway
"'O
C:
~
"tJ
i
PC-7
Zoning / Location Map
RR-C
Item: CUP20-006/MDRA20-017
• NORTH
0 125 250

ATTACHMENT B
500
Feet
AGC
OS-1DU
February 20, 2024, Item #5
....
w
0 -+i
N
0 =i -I
)>
n
:::i::
s: m
z
-I
n
\_(E~~=::{~VED\
\_(E)BUILOING7'\_
(STATER BROS.) \
8 I
I
I
i
I
~
(NjVERlZON AHT'ENNAS I RRU UNITS MOUNTED -...sJOE
(M) FAUX OOMWEY REPlACEUENT IN PLACE OF (E) F,-ux
CHMNEYUEMENTWITli(N)RFTAANSPAAENTSCREEN
PANELS. RF TRANSPARENT SCREEH IMTERIAI. 51-W.L BE
DET.1.1.E.O, 'ru(lUREDNrDPAINT£0TOMATCH (E)
ADJACEHT WALLS, SEE PAATW. ROOF P\.NI SHEET A-l

ALPHA SECTOR
AZIMUTI-1350'
1 r t i 1.ANOEL£VATJONUH EETH•""
: [ : j r-0 •~ I \ •
r--~ _///--z~-
==== JLi ~~::::::::::::_ -- -~-~ I "" --
~-----b;;-=---:.::::::~
• GAMMA.SECTOR
AZIMUT1-i250'
___ .. --
{N) VERIZON MITENNAS lo RRU UNml MOUNTED t<l$IOE
(N) f AUX CHIMNEY REP\.ACEMENT ~ Pl.ACE Of {EJ FAUX
CHIMNEY ELEMENT wml (NJ RF TRAHSPAAEHT SCREEN
PANELS. RF TRANSPARENT SCREEN MATERIAL SH.lU BE
DETM.EO, TEXT\JftED ANO PAIHTED TO MATCH (El
ADJACENT WALLS. SEE PAATW.. ROOf PU,H SHEET A,.2
NIDEl.EVATIOHSSHEETSM,.A-5
,,j
('
! I
I
I
I
I
I
I
u) 1 ·
\~ ,t;
\~
\i
I
i
I
i
I
I
----!---
!
I
I
I !
\_(EJBUILDING\
\_POWAY CREEK\ : J_i
,__o I - .....---- _,
~or - ....--r ' -
,_<,.,+- , ,:;,---- 1' I
,
-- .,,,,,. '--<2
~--->< ,;:-1 , ---- , ~ ,,. -- /
\, ,,_;_.----- /
-----,~~-- ,,,,,/ -- ,, ,,.
-~,,,,,,,.,, ./.,
of;
§lJ,.s PLAN~ KEYED NOTES:

A_ (N)VEIUZON .ICMNT TRENCH FOR POWER, F16ER I HYBRID
"\;,I' CA8LE..(EMCTROUTET .B0.)
i
PROPERTY L-...E (TYPICAL)
ADJ,l,,CEHf PROf'ERTY LNE (TYPICAl.)
\NJ 15'-0"WIOE VERIZON MGRESS I EGRESS ACCESS ROUTE
& PAAklHO LOCATION
§
"'""""""'"""''"""''

CE)TREETOBEREMCWEO
(E) ROOF ACCESS ~ER
(E)'llf-tl'WIOEIJTUTY,\CCESSEASEMENTPERMAl'IPI.ATN0. 1ml {N)VERLZONAHTEMNA.SIRRU\Jt;ITSLIOt.lHTEOINSIOE{N)
F.WI( CHIMNEY El£MEHT WITtt {NJ RFTR,\NSPAAEffT
SCREEN PANELS. RF TRANSPAAElff SCREEN W.TERlAL
SHAU BEDETAJLED, TEXTURED AHO PAJNTEDTO IM.TCH
~~~~~.:...AA .. ~ROOFPLANSHEET"-2
i
tN) 11 •lO fl&EA PUlLBOXATPROPERTYUNE (F18ER I.IMP)
tJ/E~~ ~~=AY . ZONE 'AF PER FEW.. PLATJ060T)C1J$&G.

A_ (EjSOOYEAFIFl.OOOWAY. ZOHE'X'PERFEMAPLATJ0607,C13S&G. "'-1/ EFFECTIVEW1&2012
0 ~~~~~TR~~~~:~W.VEANFCSCERTIFIED
'fl.EXSTORM F\ILL TRASH CAPTURE (FTC) NSE.RTS"Of\ CERTIFIED EOUI\IAU:NT *
.
'
CH) POWER l'OINT OF CONNECTION AT (E) SWITCHGEAR
jN) FlBER l'OINT Of' COffNECTION AT (E) FIBER PANEL OPTION 11 (N') FlBER POINT OF CONNECTIOHAT (NJ P\JU. BOX. OPTION' 1t2 c,~1/ '
* ~ , ,-----;
~~._,,. / I
/
FIRE DEPARTMENT NOTE:

THE FIRE DEPARTMENT ACCESS ROol.DWAY (AROUND THE
PAAIO'IO Lon SH.lU HAVE 20 FEET UNOeSTRUCTEO WIDTli
=~~~~~o~=~c~
TRASH TREATMENT CONTROL DEVICE NOTE:
~~~:~~:~~:~~:.::~~
STRVCT\JRES AAOUND THE PROJECT AREA OH SITL
CERTIFIED FlA.l.CAPTURE SYSTEM: FLEXSTORM F\ILL ~H
CAPTURE (FTC) INSERTS 0fl. CERTFIED EQUIVALENT 0
IMPERVIOUS SURFACE TABLE:

EXISTINOIMPERVIOOSAAEA:

NEW/CREATED IMPERVIOUS A.REA:

REPLACED IW"EftV)OUS AA9. (COHCRETE WJ4J(NfAYt.

TOTALIMPERVK)OSAAEA:
1l,7HSQ . FT.
2'-BSQ.FT.
2IIOSO,FT.
12,0USO.FT.

2.1%SQ, FT. IMPERV10U'S%1NCREASE.:

GROUND DISTURBANCE
GRADING DESCRIPTION & SUMMARY:

COAX CtJll.E TRENCH CUT:

COAX CABl.E TRENCH BACXFll.l.:
llTLITYTRE~fElEC.ITELCOJCIIT :
t/Tl.lTY TRENCH (ElECJTEl.COJ BACKFJ..L:

TOTALGAAClNG: (EXPOf\l)
1l .lC\J.VDS .

31.lC\J.l'DS .
-21.33 CU. YD$.

59.lSCU.YDS
-44A ◄ CU.YD5 .

ISSUE STATUS
2l~l121l20 l1ACl.>RIFICATIONZO.IJ8
5 l1112Y2<120I 100",1,21J_R•~.1
: 1:=1:::=:=~ : 10::,::]1::~:=-~ 1:7
PLANciiiil
1ene BERNARDOCEHnRDR/\IE,LINIT~
SAN DIEGO, CA 92128

PROPRIETARY INFORMATION
____ ,,.,.,.._.__,, .. __ ,.,._...._.
................ ___ _
.,,..,...,._._,,,.._.,_...,,....,,,,.,o
--··""""·--
'), _
c;
0 iii., >-<! <D
N
z~
0 <!
>- u
■- ~u,j
.. u~ D>
a,~~ ,-.~
0 z
<{
....J
0 ~
(l
<!..,. 0 <D
Q'.~
>- O>
~t'i ii'>"
"'~ t;;o ..,o..

SHEETTITl.E :

SITE PLAN
A-0
February 20, 2024, Item #5
....
.i:,.
0 -+,
N
0 & RRU UNfTS MOUNTED INSI
CHIMNEY REPLACEMENT IN Pl.ACE OF {E) F,

EV UEMENTWITH(N)RF TRAHSPAREHTSCR
S. RF lRA.NSPARENT SCllEEN MATERW. SHAI
EO, TEXT\.IREO /1,HO PAINTED TO MATCH (El
NT WALi..$. SEE ,t.N'TEHNA P\.ANS SH€£T J...J
ALP't<ASECTOR
,\,ll.MUllil50•
•
,;
~
~o
'9 GO
~ JJ ,;
V
..
~
_..---:::::~~\~
- ' I D ~ , ,--------~-~ -
\5
\1' 05\ (3 ~ \\ ~ ~ ~
(N) VERIZON ANT~ a. RR\J UNITS MOUNTE.O INSIDE
(N) FMJX Otw.EY REPLACEMENT IN PLACE OF (E) FAUX
"

GAWMSECTOR
AZll.4\JTH2SO-
'(j
ANTENkA.S &. RRU UNITS
l!MNEY ELEMENT WITH (N}
'IELS. RF TRANSPARENT S
ITALED.~A.ND P,
~
NT WALLS. SEE ANTENNA Pl..N-15 SHEET A-3 I /!
OJI
E.~-~JIAL ROOF PLAN ~
17" .. I!' 11!'
'(j
~
\\\\\\\\\\\\\\\\\\\,,
~~~~~~~i:T==E~
OETAI..EO, TEXTIJRED ~ PAINTED TO MATOt (El
AOJA.CENTWA.LLS. SEEAHTENHAPI.ANSSHEET ,t,..J
KEYED NOTES:
0 IN}c.Aal.ETAAYOH(N)SUEPERS
~ \E)ROOF
(E) ROOFTOP ME~ EOI.JIPMENT (TYJ'ICA.I.J
R
\El ROOF DRAINS (TYPICAL)
(EJSA.TELUTEDISH\TYPtCAl)
(EJVENTS
OUTLINE (E) FMIXCHIMNE Y ELEMENT BEl.OW TO BE REMO'ncO
(~DASHED)
• BETA SECTOR

AZIMVTMHO-
p
TDL~ TlONSl'fl,
11771 BERNARDO CEPITEI
SAN DIEGO.
'> ~
c~
W,n
O
z
N
~~
0 <(
>- u
■- :i:w
...
u:;i;
□ >
"' ~g; WI/)
:,. I
0 z
<(
....J
0 ~
0 <( ;g
~~ >- 0,
~<3
~~
~~
~ll.

SHEET TITlE :

PARTIAL ROOF
PLAN
A-2
February 20, 2024, Item #5
.....
u,
0 -ti
N
0 o/.,
~lj/\lNLINK LID PLAN~~,
F 1· >- ;·
' ' r ..... ">--' I /I
/-r
I
I
...
.......... ,,,
,;g_,
EQUIPMENT PLAN ~0/1
SCALE: lll" • 1·-cr
~
~
~1; " ~
KEYED NOTES:
0 ~~~~~~~~~~,!~~AINTEOI.

TEXTURED TO W.TOl {E)AD.JACENT BUl..DING
/>..., (N)4'-0'WIDE•r-O-HIGHSTEELPICKETGATEWITHVERIZON
'\:,/ SIGWGEONAO.L\CEHTWAlLSEEOETM.S~
~
./.',.. (N)VERIZON BATTERY CABINET ON (N)COl'ICRETE Sl.A&. CABINET SHAU.BE '-.::,/ "HARDEHEO"WITHSTAN..ESSSTEELSESPl.All:.Sl.lilOOENSHAOQ..EPAOI.OCK. 0 {N)\/'ERIZON POWERP\ANT /EQIJIPMENTCADIN'ETON{NJCONCRETESI..AB . CA.BINET SHAU.BE"'HA.R0ENEO"WITHSTAN...ESSSTEELSESPl.ATESI.HIODENStU.CIQ..EPA0t.OCK. 0 Flll\JRE \IER1ZOtl CABINET (SHOWN DASHED)
t) {"')\/'ERIZONWALL.MOUmEO INTEGRATEOLCWlCENTER{llC)
7) (NJVERIZONWAlLMOUHTEDFIBERCABINET
t) (N)WAU.MOUNn.DCI.ASS ' NY:'flR.EEXTINGU ISHER
11 ) (NJ\/'ERIZON Kc»f..ERX1!:NltC STAHD,SYGENERATOfl.WITH20J OAl.1.0N DIESELA.IEL TANK 10) (N)CONCRETESI.M
11) (N)\IERLZON JOWT TRENCH FOR POWER. FIBER.I HY8RID CA8l£ CONOUIT. SEE srre: PLAN SHEET A-0. 12) 7~WIDEJC•·-o-KIGH\/'ENTI.ATIONOPENINGWITHSTEELFIU.ME I, PICKETS o,·o.c. ll) (N)SGAUGE INDUSTRW.COMMERCIAI.CHAINUNKLIO'Ml'Hr t.lESH OPENING 14) (N)Eli11 GPS M'TENNAMOllt,jTEO ro (N)Eat.llPMENTCABIN'ETEXT!MO 'V WN1MUM12"A80YETOPOFWALL
_/.'::-... (NJ MA.IN CROUNO BOS SAA MOUNTI;O TO INSIDE FACE OF CONCRETE '-/ Bloa( E»ct.OSURE WALL
~ {NJ(JJ4"8CABLE CONOUIT I (1) M/2"D CONOUITFOfl.CROUND 17) PRO'IIOE4'•f'OPENINGATII.ASEOFWM..LFOAOA.,IJH.\GEfTYPICAJ.0F4) (N)SERVICEUGHTflXTVRE~
~
19) (NJ 1r •JO" FlBERKAHO HOL.EV,mi BOlT-OO'MICONCRETE COYER 20) (NJ3.,SCHEOUlE-40 GALVANIZED STN«>AADPIPE FRAME(TYPICAJ..) 21) (NJ GALVANIZED STEEL PIPE Cl.AMPS FOACHAJNl.lNKTEHSIOHERSTRJP 22) (N)GALV,\,NIZEOTENSIOHERSTRIP(TYP1CAL)
2 ◄) OPENING IN CONCRETE BLOCK WAU. Bf.LOW (SHOWN SHADED) 25) ~~~~~~~PI.ATESFOACNAINLINKUDCJ4'-0"0C .
211) (NJVEIUZONPOWERSERVICECO NOUIT
21) (NJ VERIZON Fl8E.R SERVICE CONDUIT
:n ) (E)CONCRl:TECVRSIOUTTER
29) (E)ASPt-W.TPAVEOPAAKINOARfA
)0) (E)CONCRETEW "1XWAY
11) RO,,IO\IE I REPI.ACE (E) COHCRETE Wl4J(WAY IN FROHT OF (N) EQUIPMENT ENCLOSURE 32) (E)TREETOBEREMOVED

ISSUE STATUS
2 IOIIIClf.N)20l1Act.AAJFICATK>NZDIIJ8
5 11123'2020 100%ZO_R..,, 1 ,,
l 12.(17/2020 100%ZD-=-R..,.2 :.-
7 09o'Z3l2021 100%ZD_R.., ,l
t 01/21121 100% ZO ENG CMITT
g I0&"1'1202Jl100%ZOR ... 51"EWl IR1-

PLANCOHI
11776 BE~DO CEtm:R ORNE, UNIT 203
SAN DIEGO, CA 92129

PROPRIETARY INFORMATION
_ ... -., ... co,,_,,., __ ,e1_ ,.__.. ____ .__
_,"""_°"""_o_•_..,.,..,,..,u,,,
............ """"·-·
): ci
ui ::,
0 m., >~
N
~~
0 <(
>- 0
·- :]: ui oz
Cl> .. a,
Za'. <( -
en
:> I
0 z
<(
__J
0 ~
Cl
<( ;g
~~ >- en
~ (3
~~
~~
<')0..

SHEET TITI.E:

EQUIPMENT PLAN
A-1
February 20, 2024, Item #5
.....
0\
0 ....

N
0 )>
-I -I )>
n :::c
s: m
z
-I
C
(5).J~AST ELEVATION
(N)VERIZON 12'-tr'•20"..fl"•l'4'HIGH

CONCRETE BLOCK EQUIPMEHT ENCLOSURE
AT GR.ADE LEVEL CONCRETE BlOCIC WAU.

SH>l.l. BE STUCCO FINISHED.PAWTED.
1'£JC'fUfU:DTO MATOt(E)AD.J.\CEHT !IUUJINC
(£)STANDING SEAM
METAi.ROOF
=~
(E)WOOCISICINC
"""""'
(E) STUCCO fHSH
"""""'
OR00'1:lfl(\'• 1to.-l _/
m ~1-,J, I
ili)J~AST ELEVATION
(E)STANO!NQSUM
r.lf.TAlROOf'
""'""'
fE)WOODSDING
=~
(E)STUCCO,ltllStt
""'"''"
(D!),.tyORTH ELEVATION (AT (N) VERIZON EQUIPMENT ENCLOSURE) 1E)$TANDINGSEAM
ME'TALII.OOf
'"''''"
(EJWOODSll»W
'"""''
(El STUCCO FINISH
'"""''

ISSUE STATUS
2 l oammJ20 1 14CUJU FICf.TlONZDI I JO
5 f 11123.7020 100'\lo ZO_R••.t
12107/2020 100'\0 ZO_R..,.l
ot/23/20:7.lf 100'\i Ztl-"-Ru.l
9 I 06114f.!02l l 100',:,ZDR1,.5{NEW) I RL
PLANcowl
iena 8ERNAA00 CENTER Df'Wt . UNT 203
5"NO.EGO, CA tll21

PROPRIETARY INFORMATION
..... _ , _ _,,_ ........ ,..,_
·--•.-··--~­__ ..,,,.._ .,....- ......... ~ .... --··""""·--· l:
0 u.i ::,
w"'
0 2
N
~~
0 <(
>- {)
·- ~u.i ..
{)~
O>
a,!~
=-- fg
Cl
z
<{
....J
Cl
~
0 <("'
o "' a: 1;l
>-"' <( <(
~ {)
~i "'~ :;; 0
"'a.

SHEETTITI..E:

LEASE EXHIBIT
A-4
February 20, 2024, Item #5
..... ......
0 ....

N
0 (E)STANOINOSEAM

METAL ROOF'
""""'
I I I j I I 11 I I I ¥ I I I II I I I:~ I I 'r I 11 I I 'r I I I I I .1 1 I ti I I I .1 I ~ I I l.1 I I I I 'r I I t::++ ~ J 1=F-1 yq j 'H r,.I/ 1 HLLr ,.,ftLI/===5Y·,.,1-:< H!---dl 1 1 \ 111=1 1 r, 1_,. 1------Y::::}-r,.i, 1::-H I r, ,1 'HU' 1·, ,1 1 1§1 1 111 1 y':::U ,. i-, i=H I r, \ ( t 1 ~
(§))~ ORTH ELEVATION
(NJ \1£RIZON N«ENNAS & RRU UNITS MOUNTED INSIDE
(HJ FAUX CHl/,IN£Y P.EJ>I.AC£MENT IN Pl.ACE OF (EJ FAUX CHIMNEY ELEMENT wm-t (NI RF TRANSl'AAENT SCREEN
PANELS. RF TRANSPAAENf SCREEN MATERIAL SHAl.t. Bc
DETAILED, T'EXT\lfl.EO AND PAINTED TO IMTCH (El
AOJACENTWAU S.
ili)J~ORTH ELEVATION
5'! !f
(E)STOREFRotIT~
CM'""'I
(N) VEf\lZON AHT'f.NtlAS I. RRU UNITS MOOHTlD NSIDE
(N) FAVX CHIMNEY REP\.A.CE.MENT IN l'\.ACE OF (E) FAUX
CHIMHl:f E1.EMEHTWIT1'i (NI RF TRANSPAAEN'T SCREEN
PANELS. RF TRANSPARENT SCREEN MATERIAL SHALL SE
DETAILED, TEXTVP.EOANDPAINT EO TO MATCH\E/
AOJACENTWAL.LS.
(El STAHOINO SEAM

METAL ROOF
"""""'
6-t"OP Of (NfANIENNAS
_ _ C{'!rn!L!Ni..2!;_
(NJAHTENNAS
(N)VEf\lZON Al4TENNAS & RRU UNTS MOONTED INS!OE
(N') FAVXCHll.lNEY ElfMENTWITli (N) RF TRANsPAAUff
SCREEN PAN EU. RF TRANSPAAENT SQI.EEN MATERIAL
SHAI.LBEDETIULEO,TE.ICTVREDANCIPAIHTEDTOMATCH
(E)AOJ.\CEN'TWALLS.
6 loP OF lNJANIENNA.S
~R.L~ - - --­
(NJAHftHNAS
11 I 'r I 11 I I 'r I I I I I .1 I B I I I 111 I ti l1 1 l.1 I I I I I 'r I I t::++ (EJSTOREFRONTWIWX1N
CM'""'I
{E) STUCCO FN5t'I
CM'""'I

ISSUE STATUS
Z oa.olr.0:0 IA,CU,RIFICATIONZO. J8
3 08.28.2020 90%Z:0 Rw.l J!I
• 0'MIW2020 IOO';OZO Jl9
5 I Hl2ll2C20 II OO';lZD_RIY. I
e 112.('17/?0XII IOO';OZO_,,_Rn.l
r l o,rzlll021 I 100',; ZO_Rn.J
t I061t'i?02l l IOO';l l0Rw .5 (NEW) I Rt
PLANcoMI
,eneeEAHAROOCEHTI:.RDRIVE.UNIT203
$AN OIEGO. CA 12128
PROPR!ETARY INFORMATION
_ .. _ _ ._.....u .. ...... ,,, .... ........
·-... ··--~­----•-o .... ,_ .. ,...._., .. ,o
----~~--·
): 0
ui :,
0 rii., >-< <D
N
z~ 0-,:
>- (.)
·- ~ui ..
(.)~
O>
G)
~g;
"'
=--~
0 z
<(
....J
0 ~
0 <..,. 0 <D
c,:1;l
>- O>
~13
~i
~~ ~o..

SHEET TITLE:

LEASE EXHIBIT
A-5
February 20, 2024, Item #5
..a.
00 0 ....

N
0 :;
-I
)>
n
J:
s: m
z
-I
m
1( :\:';,('}?~~' . .' :). ,;~tt~~-
•. ..,. t , , •
~.-
These simulations are intended for graphical purposes only and not intended to be part of or to replace the information provided on the construction drawings Proposed antennas and RRUs mounted
within proposed new and replacement
faux chimney elements finished to
match existing building
M1a1ana
13573 Poway Rd.

Poway, CA 92064
verizon'
February 20, 2024, Item #5
Proposed antennas and RRUs mounted
within proposed replacement faux
chimney element finished to match
existing building
-=:-•
These simulations are intended for graphical purposes only and not intended to be part of or to replace the information provided on the construction drawings M1a1ana
13573 Poway Rd.

Poway, CA 92064
verizon'
February 20, 2024, Item #5
Proposed antennas and RRUs mounted
within proposed new faux chimney
element finished to match existing
building
These simulations are intended for graphical purposes only and not intended to be part of or to replace the information provided on the construction drawings M1a1ana
13573 Poway Rd.

Poway, CA 92064
verizon'