Nighthawk Energy
Storage Project
Poway City Council Hearing
August 20, 2024

| 2
About Arevon
• One of North America’s leading
renewable energy companies.
• Headquartered in Scottsdale, AZ,
and New York City, NY.
• Developer, owner, and operator of
renewable energy projects,
providing clean power to utilities
and corporations across the nation.
• Manage and/or service over 160
solar, wind and energy storage
projects.

| 3
Arevon’s Energy
Storage Projects
in California
About Nighthawk
| 4
Size:
• 300 Megawatts (~9 acres)
Interconnection:
• Sycamore Canyon Substation (SDG&E)
Construction Schedule:
• 10-12 months (Operational ~Q2 2025)

| 5
Underground
Transmission Line
• The transmission line
to Sycamore Canyon Substation
will be entirely underground in
response to community
feedback.
• Easement agreements have
been executed with all
landowners along the route,
including Clerco, Stonebridge
Estates, and the Miramar Base.

Technology
& Safety
Arevon has a proven
track record of safely
constructing and operating
renewable energy projects
across the country.
| 6
| 7
Arevon’s Operational BESS Portfolio
Project Saticoy Cal Flats Townsite Coso Vikings Condor
County Ventura Monterey Clark (NV) Inyo Imperial San Bernadino Capacity 100 MW 60 MW 90 MW 61.63 MW 150 MW 200 MW
Technology Tesla Tesla Tesla Fluence Tesla Tesla
Operational 4/20/21 11/15/21 12/23/21 3/28/22 1/04/24 4/19/24 Incidents 0 0 0 0 0 0
• Arevon has operated over 2,650 MWh of BESS since 2021 with zero safety incidents. • Arevon has additional 2,800 MWh of BESS planned for 2024-2025. | 8
Technology & Safety
Arevon has been working with the Poway Fire Department since March 2022 and has obtained approval on the fire protection design.

Lithium Iron-Phosphate
(LFP) technology
powers the Tesla
Megapack used for the
project. It is notably
safer than other batter
types and Tesla has
used LFP since 2019.

Tesla and Arevon
control room
operators will
continuously
monitor the
project 24/7.

Preliminary sign-off
from Poway and SD
Fire Departments.

Will receive additional
sign-offs prior to
facility entering
operations.

The battery storage
systems contain
protection and control
features, including a
battery management
system that shuts
down when operational
environments are
anything less than
optimal.
| 9
No off-site air quality risk.

Our facilities are designed
so that hazards would be
contained and manageable.

Risks from cars, substations,
or other buildings nearby
are similar or greater to
BESS installations.

Additional Fire
Safety Measures
Multiple, redundant safeguards
are includes in the facility design:
• Outdoor containerized batteries
• Infrared thermal detection system
• 12-foot concrete fire wall
• 260-foot defensible perimeter
• On-site fire water loop and hydrants
• Perimeter air-quality monitoring sensors
• Emergency response plan and training
| 10
Project
Benefits
$12M+ in direct benefits to Poway from Nighthawk.
$2M community
giving fund committed
upon permit issuance
$3.5M guaranteed
sales tax benefits
during construction
$10K annual civic org
contributions committed
throughout operations
$6.5M+ guaranteed
property tax benefits
over 20-yr life
Thank you!
NighthawkEnergyStorage.com