Cities Index.
Agenda packet

Poway City Council
December 16, 2025

Document
Agenda packet
Meeting
December 16, 2025
Body
Poway City Council
Pages
23
Original file
291 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

AG EN DA Poway City Council
Council Chamber I 13325 Civic Center Drive I Poway , CA I 92064 December 16, 2025 I 7 p.m.

Thank you for participating in your local government and the City of Poway Council meetings.

Meetings I Regular City Council meetings are held on the first and third Tuesday of the month at 7:00 p.m. in the Council Chambers located at 13325 Civic Center Drive, Poway, CA 92064. The Council Chamber will be open to the public.

Public Meeting Access I Members of the public may attend the City Council meeting in person, or watch the City Council meeting live online. Regular City Council meetings are broadcast live on Cox Communication Channel 24 and Spectrum Channel 19. Council meeting videos are archived and available for viewing on the City's website.

Speakers I Persons wishing to address the Council on matters not on the agenda may do so under Public Comment. Those wishing to speak on items on the agenda may do so when the item is being considered. Please submit a Speaker's Slip to the City Clerk prior to the meeting or the announcement of the item. All comments will be limited to three (3) minutes. Per the Poway Municipal Code, the speaking time may be reduced.

To Watch Live:
www.poway.org/councilmeetings
Agenda Materials I This agenda contains a brief summary of each item the Council will consider.

The Agenda and Agenda Packet is posted seven (7) days prior to regular City Council meetings and are available for viewing on the City's website at www.poway.org. Sign up at https://poway.org/list.aspx to receive email notifications when City Council agendas are published online. Items listed on the agenda with a "#" symbol are in preparation.

PLEASE NOTE: Written comments received via email before 3:00 p.m. the day prior to the meeting will be distributed as formal additional material as well as be made available online prior to the City Council meeting. Written comments received after this deadline will be forwarded to the Council, but not available online until after the City Council meeting.

American Disabilities Act Title II I In compliance with the Americans with Disabilities Act of 1990, persons with a disability may request an agenda in appropriate alternative formats as required by Title II. Any person with a disability who requires a modification or accommodation in order to participate in a meeting should direct such request to the City Clerk's office 858-668-4530 at least 24 hours prior to the meeting.

Steve Vaus
Mayor
Peter De Hoff
Deputy Mayor
Vacant
Councilmember
Jenny Maeda
Councilmember
Christopher J. Pikus
Councilmember
Reminder I As a courtesy to all attendees, please silence all electronic devices and engage in conversations outside the Council Chambers.

The City Council also sits as the City of Poway Planning Commission, Poway Housing Authority, Public Financing Authority and Successor Agency to the Poway Redevelopment Agency CALL TO ORDER:

ROLL CALL:

PLEDGE OF ALLEGIANCE:

MOMENT OF SILENCE:

PRESENTATION: None
PUBLIC COMMENT : In accordance with State law, an item not scheduled on the agenda may be brought forward by the general public for comment; however, the City Council will not be able to discuss or take action on any issue not included on the agenda. You may speak up to three (3) minutes .

Per the Poway Municipal Code, the speaking time may be reduced. Speakers have one opportunity to address the Council under Public Comment.

CONS ENT CALENDAR : The Consent Calendar may be enacted in one mot ion by the Council wit h a Roll Ca ll Vote wit hout discussion unless a Councilmem ber, a member of the public, or City Manager requests that an item be remove d for discussion.

1. Approval of Reading by Title Only and Waiver of Reading in Full of Ordinances on this Agenda

2. Approval of the September 16, 2025 Regular City Council Meeting Minutes

3. Declaring the Result of the City of Poway District 2 Special Municipal Recall Election Held on Tuesday, November 4, 2025

4. Approval of Local Appointments List of City Council Appointed Committees for 2026

5. Approval of Consultant Agreement Amendment No. 2 with Kitchell CEM, Inc. for the Design of the Community Park Restroom Project; RFP No. 25-001

6. Approval of Parcel Map for Tentative Parcel Map 23-0003 (Espola Urban Lot Split); Ben Lund Engineering, Applicant (APN 321-020-68)

7. Acceptance of Public Improvements for the Sage at Old Coach Subdivision, Improvement Plan 22- 0001
ORDINANCES FOR INTRODUCTION: None
2 of 4 Regular City Council Meeting December 16, 2025
PUBLIC HEARINGS:

8. Development Review 25-0001 and Tentative Tract Map 25-0001, a Request for an Additional West Village Multi-Family Building and Private Dog Park (Fairfield II) within the Town Center Land Use District of the Poway Road Corridor Specific Plan located at 12947 Poway Road, (APN 317-490-68- 00)
City Manager's Recommendation: It is recommended the City Council conduct a public hearing, find and determine the Project is consistent with the California Environmental Quality Act (CEQA) Class 32 Categorical Exemption environmental determination made for this Project and adopt the attached Resolution approving DR 25-0001 and TTM 25-0001.

STAFF REPORTS:

9. Discussion and Possible Action to Fill City Council Vacancy City Manager's Recommendation: It is recommended the City Council provide direction to City staff on the timing of bringing back a resolution to call a special election to fill the vacant District 2 City Council seat. Based on the significant cost savings, staff recommends that the City Council direct staff to schedule a special City Council meeting and bring back a resolution calling the special election for the June 2, 2026 statewide primary.

WORKSHOPS: None
COUNCIL-INITIATED ITEMS:

10. Appointment of Deputy Mayor for 2026

11. Appointment to Regional Agencies' Boards, Commissions and Committees for 2026 COUNCIL COMMITTEE REPORTS and ANNOUNCEMENTS: Pursuant to AB1 234 - (G.C. 53232(d)) CITY MANAGER ITEMS:

CITY ATTORNEY ITEMS: (Including any public report of any action taken in closed session) CLOSED SESSION: None
ADIOURNMENT:
3 of 4 Regular City Council Meeting December 16, 2025
State of California
County of San Diego
)
) ss.
)

AFFIDAVIT OF POSTING
I, Carrie Gallagher, CMC, City Clerk of the City of Poway, hereby declare under penalty of perjury that this notice of a Regular meeting as called by the City Council of the City of Poway was posted and provided on December 9, 2025.

Said meeting to be held at 7:00 p.m., December 16, 2025, in the Poway City Council Chambers, 13325 Civic Center Drive, Poway, California. Said notice was posted on the Bulletin Board at the entrance to City Hall. 4 of 4 Regular City Council Meeting December 16, 2025
AG E.N DA REPORT City of Poway
DATE:

TO:

FROM:

December 16, 2025
Honorable Mayor and Members of the City Council
Carrie Gallagher, City Clerk c.?4---
(858) 668-4535 or cgallagher@po�ay.org

CITY COUNCIL
SUBJECT: Approval of the September 16, 2025 Regular City Council Meeting Minutes Summary
The City Council Meeting Minutes submitted hereto for approval are:
• September 16, 2025 Regular City Council Meeting Minutes The Poway City Council sits as the Poway Planning Commission, the Poway Housing Authority, the Public Financing Authority, and the Successor Agency to the Poway Redevelopment Agency.

Recommended Action:

It is recommended the City Council approve the September 16, 2025 Regular City Council Meeting Minutes.

Public Notification:

None.

Attachments:

A. September 16, 2025 Regular City Council Meeting Minutes Reviewed/Approved By:

Assistant City Manager
Reviewed By:

Alan Fenstermacher
City Attorney
Chris Hazeltine
City Manager
December 16, 2025, Item #2
1 of 7
Ap~)
2 of 7 ATTACHMENT A

CITY OF POWAY

CITY COUNCIL REGULAR MEETING

MINUTES
September 16, 2025
City Council Chambers
13325 Civic Center Drive, Poway, California
(Per Government Code 54953)
(Meeting Called to Order as City Council/City of Poway Planning Commission/Poway Housing Authority/Public Financing Authority and Successor Agency to the Poway Redevelopment Agency) CALL TO ORDER:

Mayor V
aus called the Regular Meeting to order at 7:00 p.m.

ROLL CALL:

Present
: Jenny Maeda, Christopher J. Pikus, Peter De Hoff, Steve Vaus

Absent: Tony Blain
STAFF MEMBERS PRESENT:

City M
anager Chris Hazeltine ; Assistant City Manager Wendy Kaserman; City Attorney Alan Fenstermacher; City Clerk Carrie Gallagher; Director of Development Services Julie Procopio; Director of Finance Craig Schmollinger ; Director of Human Resources and Risk Management Jodene Dunphy; Director of Public Works Eric Heidemann; Director of Community Services Audrey Denham; Fire Chief Brian Mitchell; Captain Claudia Delgado, San Diego County Sheriff’s Office.
(Note: Hereinafter the titles Mayor, Deputy Mayor, Councilmember, City Manager, Assistant City Manager, City Attorney, City Clerk and Director of Finance shall be used to indicate Mayor/Chair, Deputy Mayor/Vice Chair, Councilmember/Director, City Manager/Executive Director, Assistant City Manager/Assistant Executive Director, City Attorney/Counsel, City Clerk/Secretary and Director of Finance/Finance Officer.)
PLEDGE OF ALLEGIANCE:

Deputy
Mayor De Hoff led the Pledge of Allegiance.

MOMENT OF SILENCE:

Mayor V
aus led a moment of silence.

PRESENTATIONS:

Friends of
Poway Seniors Proclamation – San Diego Foundation Nonprofit of the Year National Preparedness Month
December 16, 2025, Item #2
City of Poway – Minutes – September 16, 2025

3 of 7
E-Bike Presentation

Council discussion ensued following the presentation. Council discussed the differences in e-bike classifications, expressing concerns about speed modifications and safety. E-bike accessibility on trails and roads, the importance of educating both students and parents, and further discussed the recent implementation of e -bike registration for Poway Unified School District (PUSD) students was discussed.

PUBLIC COMMENT:

Nick Carruther s presented along with a PowerPoint, sharing his concerns over the approval process of Minor Development Review Applications (MDRA) subject to hillside/ridgeline review.

Donna Myers shared her concerns over e- bike usage and pedestrian safety along private and restricted trails.

Heather Jalisi encouraged support of California Assembly Bill (AB) 2234, which would allow the City of Poway to pilot age restrictions for e-bike riders.

Vanessa Springett thanked the Public Works department for tree maintenance, requested law enforcement assistance related to residential traffic safety, and thanked Assistant City Manager Kaserman and wished her well.

Shannon Delaporta, on behalf of the Del Mar Fairgrounds, announced the upcoming Fairgrounds 2050 Regional Open House series.

William King requested City assistance with hazardous tree removal and clearing the storm drain on Riverbend Court in hopes of mitigating future fire risks.

Terri Sorensen, on behalf of the Poway Neighborhood Emergency Corps (PNEC) and Poway Fire Safe Council, announced Disaster Ready Block Parties events scheduled throughout Poway.

CONSENT CALENDAR:

Motioned by Deputy Mayor De Hoff seconded by Councilmember Pikus to approve Consent Calendar Items 1 through 10. Motion carried 4/0/1 by the following roll-call vote:

Ayes: Maeda, Pikus, De Hoff, Vaus
Noes: None
Abstained: None

Absent: Blain
Disqualified: None

1. Approval of Reading by Title Only and Waiver of Reading in Full of Ordinances on this Agenda

2. Approval of the June 3, 2025, and June 17, 2025 Regular City Council Meeting Minutes

3. Second Reading and Adoption of Ordinance No. 876 entitled “An Ordinance of the City Council of the City of Poway, California, Amending Chapter 3.28 of the Poway Municipal Code Regulating the City’s Formal Bidding Procedure, and Award and Execution of Purc hasing Contracts”
December 16, 2025, Item #2
City of Poway – Minutes – September 16, 2025

4 of 7

4. Approval of Resolution No. 25- 042 for the Addition of Emergency Preparedness Program Manager Classification, and Approving Changes to the City of Poway Position Classification Plan and Management/Confidential Salary Schedule

5. Award of Contract to Savant Solutions for Managed Detection and Response (MDR) Security Services Provider

6. Approval of Consultant Agreement with TKE Engineering, Inc., for the Water Treatment Plant Chemical Tank Replacement Project; RFP No. 25-011

7. Award of Agreement to Carollo Engineers, Inc. for Sewer Master Plan Update, RFP No. 26- 003

Deputy Mayor De Hoff spoke in regard to Items #6 and #7. He explained the agreements total approximately $1,000,000 but are funded through grants and will not impact water or sewer bills. He noted that these agreements play an important role in guiding the City’s future infrastructure projects. Regarding wastewater, he highlighted the inclusion of an infiltration and inflow study, which will help identify areas where the City can reduce excess water entering the system, which will ease the load on the larger wastewater system and lower long- term costs.

8. Award of Agreement to Kennedy/Jenks Consultants, Inc. for Water Master Plan Update, RFP No. 26-003

9. Acceptance of Public Improvements for the Fairfield Project, Street Improvement Plan 21-002

10. Acceptance of Public Improvements for the Lyon Estates Project, Street Improvement Plan 21-003

ORDINANCES FOR INTRODUCTION:

None.

PUBLIC HEARINGS:

11. Resolution Adopting the Report on City’s Water Quality Relative to Public Health Goals for 2022-2024

Mayor Vaus opened the Public Hearing at 7:50 p.m.

Assistant Director of Public Works for Utilities Troy DePriest presented the item along with a PowerPoint presentation. Mr. De Priest explained the Health Goals (PHG) Report was developed in conjunction with the City’s Annual Water Quality Report, also known as the Consumer Confidence Report. The purpose of the PHG Report is to increase consumer awareness of drinking water safety and demonstrate compliance with applicable state and federal regulatory requirements.

He stated t he City of Poway (City) operates and maintains over 14,000 water service connections and collects and analyzes tens of thousands of water samples each year which are tested for a wide range of chemicals and potential contaminants to ensure the delivery of safe and reliable drinking water.

December 16, 2025, Item #2
City of Poway – Minutes – September 16, 2025

5 of 7
The City employs state- certified water treatment operators and maintains 24/7 staffing to monitor and address water quality concerns in real time. Water quality testing is conducted weekly at a state- certified Environmental Laboratory Accreditation Program (ELAP) facility, and monitoring occurs continuously at the Lester J. Berglund Water Treatment Plant.

Water quality standards, including Maximum Contaminant Levels (MCLs), are legally enforceable and set by the United States Environmental Protection Agency (EPA) and the State Water Resources Control Board, Division of Drinking Water (DDW). In contrast, Public Health Goals (PHGs) are non-enforceable water quality objectives developed by the California Environmental Protection Agency (CalEPA), Office of Environmental Health Hazard Assessment (OEHHA).

Mr. De Priest concluded the City’s drinking water continues to meet or exceed all federal and state standards established to protect public health.

Public Comment:

None.

End of Public Comment.

Mayor Vaus closed the Public Hearing at 7:57 p.m.

Council discussion ensued. Council voiced appreciation for transparency in reporting on and proactively testing the City’s water . Council acknowledged an understanding that Maximum Contaminant Levels (MCLs) are generally considered regulatory goals —often set at zero to reflect ideal standards —even though reaching zero is not realistically achievable in many cases. Council shared concerns over the economic feasibility of using reverse osmosis (RO) to reach the ideal (zero contamination) goals.

Motioned by Mayor Vaus, seconded by Deputy Mayor De Hoff to adopt Resolution No. 25-043 entitled “A Resolution of the City Council of t he City of Poway, California, Adopting the Report on the City’s Water Quality Relative to Public Health Goals for 2022-2024.” Motion carried 4/0/1 by the following roll-call vote:

Ayes: Maeda, Pikus, De Hoff, Vaus
Noes: None
Abstained: None

Absent: Blain
Disqualified: None

Following Council approval of Resolution No. 25- 043, Principal Civil Engineer for Utilities Robert Weber provided a Water Infrastructure Program Update along with a PowerPoint presentation.

Mr. Weber provided an overview of the City’s water- related facilities. He noted the Water Infrastructure Improvement Program (Program) is the largest series of capital projects the City has undertaken since incorporation. He noted collectively the program will improve the resiliency and redundancy of Poway’s water infrastructure system and provide safe and reliable water service to Poway residents for generations to come.

December 16, 2025, Item #2
City of Poway – Minutes – September 16, 2025

6 of 7
He presented slides showing the Clearwell Bypass Project and updates on the Clearwell Replacement Project and remaining projects related to the Water Infrastructure Improvement Program. He stated the bypass project is operationally successful and was completed under budget in November of 2022, with the construction of temporary bypass tanks, temporary pump station to supply those tanks and a permanent 36-inch below ground pipeline from the treatment plant out to the distribution system.

Mr. Weber then discussed the current phase of the project, replacement of the Clearwell. His presentation included project and design status, updates on the project timeline and details regarding the construction management contract. He noted construction for this phase of the project is 75% complete and staff anticipate commissioning of the new Clearwell facility in late Spring 2026. Mr. Weber shared slides highlighting the construction’s progress.

The presentation included information on the final two projects known as the Treated Water Facilities Projects. Status updates and an overview of the scope of the projects were shared, including designer scope adjustments for final design work and drafting Memorandum of Understanding (MOU) to document project scope revisions and staff negotiations for a water purchase agreement with the Ramona Municipal Water District (MWD). The project’s anticipated construction start date is anticipated for late 2026 . Other related projects include two Interconnections with the City of San Diego and the Lake Poway Softball Field Restoration. Mr. Weber concluded his presentation with a 12-month look ahead of the Water Infrastructure Improvement Program.

STAFF REPORTS:

None.

WORKSHOPS:

None.

COUNCIL-INITIATED ITEMS:

None.

COUNCIL COMMITTEE REPORTS and ANNOUNCEMENTS: Pursuant to AB1234 - (G.C. 53232(d))

Councilmember Maeda reported having attended the 60th Annual Poway Rotary Parade and thanked the Fire Department for their participation in the event.

Councilmember Pikus
reported having attended the 60th Annual Poway Rotary Parade and invited residents to attend the upcoming 52nd Annual Poway Rodeo scheduled for September 26 and September 27, 2025.

Deputy Mayor De Hof f invited residents to attend the upcoming 52nd Annual Poway Rodeo scheduled for September 26 and September 27, 2025. In addition, Mr. De Hoff congratulated the City of Poway Finance Department on their Award of Financial Reporting Achievement from The Government Finance Officers Association of the United States and Canada.

Mayor Vaus requested Council consensus for the following:

December 16, 2025, Item #2
City of Poway – Minutes – September 16, 2025

7 of 7
Initiated by Mayor Vaus to direct staff to explore potential regulations and safety requirements related to e- bike usage within the City of Poway at a future City Council meeting. Approved 4/0/1 (Absent: Blain).

Mayor Vaus congratulated City Attorney Alan Fenstermacher for being named in the 2026 edition of the Best Lawyers in America for Land Use and Zoning Law. Mayor Vaus, on behalf of the San Diego County Regional Airport Authority , announced the opening of Terminal 1 at San Diego International Airport.

CITY MANAGER ITEMS:

None.

CITY ATTORNEY ITEMS: (Including any public report of any action taken in closed session)

City Attorney Fenstermacher reported out stating City Council voted 4/0/1 (Absent: Blain) to waive attorney client privilege as to emails and other communications between the City Attorney’s office and Councilmember Blain regarding the Public Records Act and record retention responsibilities and requirements.

CLOSED SESSION:

12. Conference with Legal Counsel – Existing Litigation Pursuant to (Government Code § 54956.9(d)(1))
Name of Case: City of Poway v. Arthur (Tony) Blain, San Diego Superior Court Case No. 25CU024105C

ADJOURNMENT:

Mayor Vaus recessed the Regular City Council meeting into Closed Session at 8:18 p.m.

The meeting was adjourned at 8:45 p.m.

__________________________________
Carrie Gallagher, CMC
City Clerk
City of Poway, California

December 16, 2025, Item #2
1 of 8
December 16, 2025, Item #3
DATE:

TO:

FROM:

CONTACT:

SUBJECT:

Summary:

AGENDA REPORT CityofPoway
December 16, 2025
Honorable Mayor and Members of the City Council
Carrie Gallagher, City Clerk ~
Carrie Gallagher, City Clerk
(858) 668-4535 or [email protected]

CITY COUNCIL
Declaring the Result of the City of Poway District 2 Special Municipal Recall Election Held on Tuesday, November 4, 2025
The City of Poway conducted a Special Municipal Recall Election in consolidation with the State of California Special Municipal Election on Tuesday, November 4, 2025, for the purpose of of submitting a question to the voters of whether Anthony (Tony) Blain should be recalled (removed) from the Office of District 2 Councilmember of the City of Poway. On November 5, 2025, after unofficial election results showed over 80% voting in favor of the recall, former Councilmember Blain resigned effectively immediately. A recall vote must still be certified by the City Council upon receipt and certification by the San Diego County Registrar of Voters (ROV). Adoption of the recommended resolution is required to conclude the election process in conformance with the State of California's election laws.

Recommended Action:

It is recommended the City Council adopt the Resolution reciting the facts of the Special Municipal Recall Election held on Tuesday, November 4, 2025, declaring the result and such other matters as may be provided by law.

Discussion:

On March 19, 2025, a Notice of Intention to Circulate Recall Petition for District 2 Councilmember Anthony (Tony) Blain was filed with the Office of the City Clerk. On April 17, 2025, the City Clerk determined the Petition for Recall form met the statutory requirements and, therefore, was approved for signature circulation. On July 16, 2025, the recall petition was submitted to the Office of the City Clerk in accordance with California Elections Code prior to the deadline of July 16, 2025 and was transferred to the Registrar of Voters for verification of signatures. On July 30, 2025, the ROV completed the verification process and provided the Poway City Clerk with a Certificate as to the Verification of Signatures on Petition. Pursuant to California Elections Code §§11240-11242, the Poway City Council called a Special Municipal Recall Election to be held on Tuesday, November 4, 2025 for 2 of 8
December 16, 2025, Item #3
the purpose of submitting a question to the voters of whether Anthony (Tony) Blain should be recalled (removed) from the Office of District 2 Council member of the City of Poway. On November 5, 2025, after the initial and unofficial voting results were provided for the Special Election, former Council member Blain resigned effectively immediately. Under Elections Code §11302(b)(2), if an office becomes vacant after a recall petition has been filed, even if the officeholder resigns from office, the recall election must still proceed, and the outcome of that election treated as fully effective. This requirement applies when the elections official has verified that a sufficient number of signatures were submitted before the vacancy occurred. In this case, the City received a Certificate of Verification of Petition Signatures from the San Diego County Registrar of Voters on July 30, 2025 prior to calling for the Special Election, confirming that the signature threshold was met, as noted in the Agenda Report dated August 5, 2025
A total of 6,241 votes were cast in the November 4, 2025 City of Poway District 2 Special Municipal Recall Election, with a majority of the votes on the recall voting in favor.

The votes were as follows:

City of Poway
Recall Anthony (Tony} Blain
YES 5,017
NO 1,224
Total Ballots Cast 6,241
Section 10262 of the California Elections Code requires the City Clerk, upon receipt of the results of the election from the San Diego County Registrar of Voters (ROV), to certify the results to the governing body following presentation of the canvass of the returns. The Certificate of the Registrar of Voters (Exhibit A, Attachment A) reflects the full, true and correct Statement of Vote, of the Special Municipal Election held on Tuesday, November 4, 2025. By adoption of the resolution, the City Council declares that a majority of voters voting on the question relating to the recall of Anthony (Tony) Blain voted in favor, and that Anthony (Tony) Blain is recalled from the Office of District 2 Council member of the City of Poway.

Environmental Review:

None.

Fiscal Impact:

There is no fiscal impact associated with this action.

Public Notification:

None.
3 of 8
December 16, 2025, Item #3
Attachments: A.

Resolution
Reciting
the
Facts
of
the
Special
Municipal
Recall
Election
Reviewed/
Approved
By:

Assistant
City
Manager
Reviewed
By
:

Alan
Fenstermacher
City
Attorney
Approved
By:
ode}_
Chris
Hazeltine
City
Manager
RESOLUTION NO. 25-

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

POWAY, CALIFORNIA, RECITING THE FACTS OF THE SPECIAL

MUNICIPAL RECALL ELECTION HELD ON TUESDAY,
NOVEMBER 4 , 2025 , DECLARING THE RESULT AND SUCH

OTHER MATTERS AS MAY BE PROVIDED BY LAW
WHEREAS, a Special Municipal Election was held and conducted in District 2 of the City of Poway on Tuesday, November 4, 2025 , as required by the law, for the purpose of submitting the question of the recall of District 2 Councilmember Anthony (Tony) Blain; WHEREAS, a notice of the election was given in time, form and manner as provided by law, vote centers were properly established, election officers were appointed, and in all respects, the election was held and conducted and the votes were cast, received and canvassed and th e returns made and declared in time, form and manner as required by the provisions of the Elections Code of the State of California for the holding of elections in general law cities; and WHEREAS, the Registrar of Voters of the County of San Diego canvassed the returns of the election and has certified the results to the City Council of the City of Poway, California, the results are attached and made a part and attached hereto as Exhibit A.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway as follows:

SECTION 1: The whole number of votes case in District 2 of the City of Poway are reflected in the Certificate of Registrar of Voters as to the Result of the Canvass of the City of Poway Special Municipal Recall Election Returns, attached hereto as Exhibit A.

SECTION 2: The question voted upon by the voters of District 2 of the City of Poway at the Special Municipal Recall Election as follows:

Shall Anthony (Tony) Blain be recalled (removed) from
the Office of Councilmember of District 2 of the City of Poway?
YES
NO
YES 5,017
NO 1,224
S
ECTION 3: The City Council does declare and determine that, as a result of the election, a majority of the voters voting on the question relating to the recall of Anthony (Tony) Blain voted in support thereof, and that Anthony (Tony) Blain shall be recalled (removed) from the Office of District 2 Councilmember of the City of Poway.

SECTION 4: The City Clerk shall enter on the records of the City Council of the City of Poway, a statement of the result of the election, showing (1) the whole number of ballots cast; and (2) the total number of votes for and against said question.

SECTION 5: The City Clerk shall certify to the passage of and adoption of this resolution 4 of 8
December 16, 2025, Item #3

ATTACHMENT A
Resolution No. 25-

Page 2 ends

and enter it into the book of original resolutions.

PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Poway, California on the 16th day of December, 2025 by the following vote, to wit:

AYES:

NOES:

ABSTAINED:

ABSENT:

DISQUALIFIED:

______________________________
Steve Vaus, Mayor

ATTEST:

________________________________
Carrie Gallagher, CMC, City Clerk

5 of 8
December 16, 2025, Item #3
6 of 8
December 16, 2025, Item #3
Exhibit A
filounttl 11£ ~an ~ieBn
CYNTHIA L. PAES REGISTRAR OF VOTERS Registrar of Voters County Operations Center Campus 5600 Overland Avenue, Suite 100, San Diego, California 92123-1278 Telephone: (858) 565-5800 Toll-free: 1 (800) 696-0136 TTY/ TDD: (800) 735-2929 Facsimile: (858) 505-7294 Web Address: www.sdvote.com
December 2, 2025
TO: Andrew Potter
Clerk of the Board of Supervisors
FROM: Cynthia L. Paes
Registrar of Voters
NOVEMBER 4, 2025, STATEWIDE SPECIAL ELECTION CERTIFICATION Enclosed are the certified results for the following elections:

Jurisdiction: Statewide
Election Date: November 4, 2025
Resolution No. 25-

Page 3 ends

SHAWN K. BROM
Assistant Registrar of Voters
Please contact my staff at (858) 505-7214 if you have any questions regarding this matter.

Enclosure: Election Results
C: Supervisor Terra Lawson-Remer, Chair
Supervisor Monica Montgomery Steppe, Vice Chair
Supervisor Paloma Aguirre, Chair Pro Tern
Supervisor Joel Anderson
Supervisor Jim Desmond
Ebony N. Shelton, Chief Administrative Officer
Caroline Smith, Assistant Chief Administrative Officer
Brian Albright, Deputy CAO, Finance & General Government Group Carrie Gallaher, City of Poway City Clerk
7 of 8
December 16, 2025, Item #3

CERTIFICATION
OF
Resolution
No
. 25-
Page
4 COUNTY

CLERK/REGISTRAR
OF
VOTERS
OF
THE
RES
UL
TS
OF
THE

CANVASS
OF
THE

NOVEMBER
4,
2025,

STATEWIDE

SPECIAL

ELECTION
ss.

I, Cynthia
L
Paes
, County
Clerk/Registrar
of
Voters
of
County
of
. San
Diego
____
. do
hereby
certify
that.
in
pursuance
of
the
provisions
of
Elections
Code
section
15300
, et
seq.,
I did
canvass
the
results
of
the
votes
cast
in
the
Statewide
Special
Election
held
in
said
County
on
November
4, 2025,
for
the
measure
that
was
submitted
to
the
vote
of
the
voters,
and
that
the
Statement
of
Votes
Cast
, to
which
this
ce1tificate
is attached
is full,
true,
and
correct.

I hereby
set
my
hand
and
official
seal
this~
day
of
_ Decembe
·
, 2025,
at the
County
of
_S_a_n
_Di_eg_o
________
_
!erk/Registrar
of
Voters
County
of_S_a_n_D_eg'-o
__________
_
State
of
California
Canvass
Certification
of
Llections
Official
( 11
12025)
8 of 8
December 16, 2025, Item #3
Total
Registration
and
Turnout
Mail Vote
Centers
Registered
Voters
2,023
,379
PROP
50 -CONGRESSIONAL

REDISTRICTING
-
Majority-Required
to
pass
( 1754
of
1754
precincts reported
)
YES NO
646,358 409,781
Total
1,056,139
CITY
OF
POWAY

MEMBER,
CITY

COUNCIL

DISTRICT
NO
. 2 -
RECALL

ELECTION
( 8
of
8 precincts
reported
)
YES NO
Total
5,017 1,224 6,241
Data
Refreshed:

Tuesday,
December
2,
2025
1 :01
PM
Printed
: Tuesday,
December
2,
2025
1 :02
PM
County
of
San
Diego
Special
Election
November
4,
2025
Official
Results
Turnout
1,056,873
985,008 71
,865
61 .20%

38.80% 80.39% 19.61%
Page
1 of
1 Resolution
No.
25-
Page
5 December 16, 2025, Item #4
AGENDA RE PO RT City of Poway
DATE:

TO:

FROM:

December 16, 2025
Honorable Mayor and Members of the City Council
Carrie Gallagher, City Clerk uefo
(858) 668-4535 or [email protected]

CITY COUNCIL
SUBJECT: Approval of Local Appointments List of City Council Appointed Committees for 2026 Summary:

The City Clerk has prepared the annual Local Appointments List required by California Government Code Section 54972. The Code requires on or before December 31st of each year, the legislative body shall prepare an appointments list of all regular and ongoing boards, commissions, and committees which are appointed by the legislative body of the local agency.

Recommended Action:

It is recommended the City Council approve the Local Appointments List for 2026 and authorize the City Clerk to post in accordance with Government Code Section 54973.

Discussion:

Government Code Sections 54970-54974, also known as the Maddy Act, require the City Council prepare and post a Local Appointments List on or before December 31st of each year of all regular and ongoing boards, commissions, and committees. The list must contain the following information:

1. All appointive terms which will expire during the next calendar year;

2. The name of the incumbent appointee;

3. The date of appointment and the date the term expires; and

4. The necessary qualifications for the position
This information allows any resident the opportunity to apply to serve on a Committee. The City currently has two Committees that fall under the provisions of this section. They are the Budget Review Committee (BRC) and the Parks and Recreation Advisory Committee (PRAC) in which committee members serve two-year terms. Due to expiring terms in December 2025, the City will have two (2) vacancies on the BRC. The BRC meets approximately four times a year in April and May, the PRAC meets as needed. Application material will be available on the City's website and in the City 1 of 3
December 16, 2025, Item #4
Clerk's Office. The application process will open on Monday,January 12, 2026 and applications will be accepted through 5:00 p.m. on Thursday, February 12, 2026. Appointments are tentatively scheduled to be made at the March 17, 2026 City Council meeting. Any other vacancies that occur during 2026 would be unscheduled and a notice would be posted in accordance with Government Code Section 54974.

Environmental Review:

This action is not subject to review under the California Environmental Quality Act (CEQA).

Fiscal Impact:

None.

Public Notification:

Upon approval, the Local Appointments List will be posted on the City's website and outside City Hall and shall remain posted for the full calendar year to remain in compliance with the Maddy Act.

Attachments:

A. Local Appointments List 2026
Reviewed/Approved By:

Assistant City Manager
2 of3
Reviewed By:

Alan Fenstermacher
City Attorney
Chris Hazeltine
City Manager
3 of 3 AT

TACHMENT A
City of Poway

LOCAL APPOINTMENTS LIST
2026
In compliance with the requirements of the Maddy Act, Government Code 54972, the following appointment list is posted on an annual basis by December 31st. The City Clerk’s Office submits the following:

BUDGET REVIEW COMMITTEE
Qualifications: The committee consists of five (5) members who must be Poway residents.

Purpose: The purpos e of the Budget Review C ommittee shall be to review the annual Operating and Capital Improvement Budget as proposed by the City Manager and report its findings to the City Council.

Term: Two Year s
Expiring terms:
* Phil
Rath served one year as a replacement to fill a vacant unexpired two-year appointment

PARKS AND RECREATION ADVISORY COMMITTEE
Qualif
ications: The committee consists of five (5) members who must be Poway residents.

Purpose: The purpos e of the Parks and Recreation Advisory Committee shall be to advise the City Council on the parks and recreational needs of the City of Poway on an as-needed basis.

Term: Two Y ears
Expiring terms:

Name Appointed By Appointed Term Expires
Vanessa Springett Anita Edmondson 3/19/2024 12/31/2025
* Phil Rath Steve Vaus 3/18/2025 12/31/2025
Steven Bauman Peter De Hoff 03/18/2025 12/31/2026
Chris Olps Jenny Maeda 03/18/2025 12/31/2026
Alec Huettinger Christopher J. Pikus 03/18/2025 12/31/2026 Name Appointed By Appointed Term Expires
Sherry Bravo Steve Vaus 03/18/2025 12/31/2026
Nick Carruthers Peter De Hoff 03/18/2025 12/31/2026
Janice Schock Tony Blain 03/18/2025 12/31/2026
Juliet Vasel-Phillips Jenny Maeda 03/18/2025 12/31/2026 Gregg Brandalise Christopher J. Pikus 03/18/2025 12/31/2026 December 16, 2025, Item #4
December 16, 2025, Item #5
DATE:

TO:

FROM:

CONTACT:

SUBJECT:

Summary:

AG EN DA REPORT City of Poway
December 16, 2025
Honorable Mayor and Members of the City Council
Julie Procopio, Director of Development Service(g
Cassandra Seaboch, Assistant Engineer
(858) 668-4625 or [email protected]

CITY COUNCIL
Approval of Consultant Agreement Amendment No. 2 with Kitchell CEM, Inc. for the Design of the Community Park Restroom Project; RFP No. 25-001 Kitchell CEM, Inc. ("Kitchell") was selected as the most qualified consultant who provided the best value to the City for the design of the Community Park Restroom. After evaluating alternatives and completing 30% design, it is recommended a masonry structure be constructed at the northeast corner of the bocce ball courts. This Consultant Agreement Amendment No. 2 will provide for completion of the design for the Community Park Restroom project.

Recommended Action:

It is recommended the City Council approve the Consultant Agreement Amendment No. 2 (Attachment A) with Kitchell for design services for the Community Park Restroom project increasing the contract total to $153,570 and authorizing the City Manager to execute the necessary documents.

Discussion:

In January 2022, the Community Parks Needs Assessment was adopted by the City Council identifying and prioritizing future improvements at Community Park. The assessment identified priorities which include better access to amenities throughout the park. The northwest side of Community Park includes the Adventure Playground, the Bocce Courts, Picnic Area 4 Gazebo and other smaller picnic areas. Currently, there is no convenient restroom to the northwest side of Community Park. The City Council budgeted funds to construct a restroom as a part of the FY 2023-24 Capital Improvement Program Budget.

In June 2024, the City issued a Request for Proposal (RFP) for engineering design services to prepare preliminary design and evaluate alternatives for the Community Park Restroom project. The City initially considered two potential options for installing a restroom to meet the City's goals:

1. Conversion of the existing Bocce Ball storage room into a restroom; or

2. Installation of a new _prefabricated restroon:i at the northeast corn~r of the Bocce Ball court. 1 of 32
December 16, 2025, Item #5
The solicitation yielded four proposals. Kitchell submitted a responsive and qualified proposal for the project and was selected to prepare the preliminary engineering, conceptual design and 30% construction documents based on their extensive experience providing similar services. The purpose of awarding Kitchell a contract for preliminary design services (Attachment B) was to explore both restroom options at 30% design and choose which option best suited the City's needs before proceeding with full design of the selected alternative.

The City requested a preliminary design and cost estimate to compare the prefabricated building option with a masonry structure constructed onsite through Contract Amendment No. 1 (Attachment C). The cost estimate reflected a lower cost to construct the restroom onsite when compared to the prefabricated restroom option which would require crane mobilization in an area of the park with constrained access. This largely contributed to higher costs for the prefabricated restroom option.

The conversion option was ruled out due to the current structure not having adequate restroom and storage space. The constructed onsite restroom not only had a lower cost estimate when compared to the prefabricated option, it also presents the opportunity to customize the restroom to match the City's overall park and Community Center aesthetic and offers superior durability. Attachment D shows preliminary renderings of the proposed restroom.

With these aspects in mind, City staff recommends proceeding with construction of a masonry structure onsite. The original contract for preliminary design services for two options at 30% design was $20,830.00. The cost for contract Amendment No. 1, which compared the restroom constructed onsite to the prefabricated option was $15,240.00. Kitchell has presented a proposal to provide the complete plans, specifications and cost estimate for the restroom at a cost of $117,500.00. Upon approval of Amendment No. 2, the revised fee for the design contract will total $153,570.00.

Approval of this Agreement Amendment will provide professional design services for the Community Park Restroom project, including design survey, preparation of a preliminary design technical memorandum and development of construction bid documents. Completion of this design effort will allow the City to proceed with the bid and construction of the new park restroom.

Environmental Review:

The proposed project is Categorically Exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15303 (Class 3: New Construction or Conversion of Small Structures). Class 3 exemptions apply to the construction of small facilities and accessory structures, including buildings not exceeding 2,500 square feet in floor area. The proposed project consists of the design and subsequent construction of an approximate 250 square foot restroom building, and an attached 160 square foot covered patio. The project will be served by existing public utilities, and it does not disturb any sensitive environmental resources. Furthermore, Staff has determined that none of the exceptions to the use of categorical exemptions, as outlined in CEQA Guidelines Section 15300.2, will apply to the project.

Fiscal Impact:

There is sufficient funding totaling $1,046,330.00 available in the Community Park Restroom project account (PK025) for the design contract. Project PK025 is funded by the Capital Projects -Park Improvements Fund 4110, which includes $500,000 as a required contribution from an Agreement for Long Term Encroachment of Public Right-of-Way between the City and Pome BESS, LLC for the Pome Battery Energy Storage System Project. The City proactively plans for essential park i"nfrastructure 2 of 32
December 16, 2025, Item #5
repair and enhancement projects as part of the annual budget process.

Public Notification:

None.

Attachments:

A. Amendment No. 2
B. Standard Agreement
C. Amendment No. 1
D. Preliminary Rendering of Community Park Restroom
Reviewed/Approved By:

Assistant City Manager
3 of 32
Reviewed By:

Alan Fenstermacher
City Attorney City Manager
December 16, 2025, Item #5

SECOND AMENDMENT TO STANDARD

AGREEMENT FOR SERVICES
This SECOND AMENDMENT TO AGREEMENT is made and entered into effective this 17th day of December 2025, by and between the CITY OF POWAY, a municipal corporation (the "CITY"), and KITCHELL/CEM, INC., a California corporation, ("CONSULTANT").

RECITALS

1. CITY and CONSULT ANT entered into that certain "STANDARD AGREEMENT FOR SERVICES," dated September 3, 2024, (the "AGREEMENT"), by which CITY and CONSULTANT established the terms and conditions for providing the services of a private consultant to perform design services for the Community Park Restroom Project to CITY.

2. The AGREEMENT has a start date of September 3, 2024, and will expire upon completion of the project.

3. CITY and CONSUL TANT amended the Compensation and Reimbursement section of the AGREEMENT to the not to exceed amount of Thirty-Six-Thousand and Seventy Dollars ($36,070), by signing the First Amendment to Standard Agreement for Services dated April 21, 2025

4. This SECOND AMENDMENT TO THE STANDARD AGREEMENT FOR
SERVICES (the "SECOND AMENDMENT") is necessary to amend the Scope of Services and Compensation and Reimbursement sections of the AGREEMENT.

NOW, THEREFORE, IT IS HEREBY AGREED AS FOLLOWS:

Section 1. Section A of EXHIBIT "A" ('SPECIAL PROVISIONS") of the AGREEMENT is amended to read as follows:

A. Scope of Services.

Consultant agrees to perform consulting services as required by City, which shall consist of the scope of services in the original agreement and shall include the design services further described in the Scope of Services submitted with the amended proposal, which is included in this document as Attachment 1, and incorporated by reference, as if its contents were fully set forth herein. Consultant shall provide the necessary qualified personnel to perform the services.

Section 2. Section B of EXHIBIT "A" ('SPECIAL PROVISIONS") of the AGREEMENT is amended to read as follows:
4 of 32
B. Compensation and Reimbursement.

City shall pay Consultant a fee in accordance with the Fee Proposal submitted with the proposal which is included in this document as Attachment 1. Tot~! fee is not to exceed O1;1e Hundred Fifty-Three Thousand

ATTACHMENT A
December 16, 2025, Item #5
Five Hundred and Seventy Dollars ($153,570). Consultant's fee shall include and Consultant shall be responsible for the payment of all federal, state, and local taxes of any kind which are attributable to the compensation received.

Section 3. Except as otherwise amended by this SECOND AMENDMENT, all other terms and conditions of the AGREEMENT shall remain in full force and effect.

IN WITNESS WHEREOF, the patties hereto have caused this SECOND AMENDMENT to be executed the day and year first above written.

CITY OF POWAY,
a municipal corporation
By ____________ _
Chris Hazeltine, City Manager
ATTEST:

Carrie Gallagher, CMC, City Clerk
APPROVED AS TO FORM:

Alan Fenstermacher, City Attorney
5 of 32
KITCHELL/CEM, INC.

By ______________ _
Bikramjit Johal, Vice President
2 December 16, 2025, Item #5
B 1 :◄ , ,3 : i 4 ! !
November 7, 2025
Cassie Seaboch
Assistant Engineer
City of Poway
13325 Civic Center Drive
Poway, CA 92064
ATTACHMENT 1
RE: Fee Proposal -Professional Design Services
City of Poway Park Restroom -New Build
Dear Ms. Seaboch,
Revision 2
We want to thank you for the opportunity to submit this fee proposal for Design Services to provide construction documents for the Poway Park Restroom.

Project Understanding
Kitchell understands the city wants to build a ground-up restroom building at Poway Park adjacent to the Boccie ball courts. Based on the previously provided design, Kitchell will develop construction documents for a stand-alone restroom building, which will incorporate design elements from the nearby community center to tie in with the existing architectural vernacular.

Kitchell will provide construction document services and assist the city with obtaining a building permit.

The City of Poway will engage Bidding and CA services under a separate contract.

Scope of Services
The following scope of work will be included in this project:
• Prepare a set of construction documents and specifications at the 50% and 100% level for work to be completed which includes:
o Building design showing new finishes, fixtures, and accessories o New building lighting and power
o New building HVAC and plumbing
o Exterior finishes and roofing
o Site utility services and tie-ins, including: electrical, domestic & sewer water. Fire sprinkler water lines will not be required for the building.
o Tie in new concrete flatwork, grading, and wet utilities (domestic & sewer water) to the new building footprint and connect to existing concrete sidewalks. o Title 24 energy calculations
o Cost Estimating at 100% CD's
o Assist the County with obtaining a building permit.

Kitchell CEM
9905 Mira Mesa Blvd. I Suite 300 I San Diego, California 92131 I Phone 858.947.5144 I www.kitchell.com Page 1 6 of 32
December 16, 2025, Item #5
Clarifications The
scope
of
work
as
described
in
the
Scope
of
Services
section
above
is
further
clarified
as
follows:
•
Kitchell
will
prepare
a
topographic
survey.
•
All
permitting
fees
will
be
paid
by
the
city.
•
Landscaping
work,
including
irr
igation
other
than
as
identified
above
in
the
scope
of
services,
is
excluded.
•
Kitchell
assumes
there
is
an
accessible
path
of
travel
(POT)
to
the
area
of
work
.
•
Energy
goals/audits,
LEED,
or
other
performance
criteria
not
explicitly
identified
are
excluded.
•
CEQA
is
excluded.
•
Bid
review
and
Construction
Administration
is
excluded.
•
Existing
hazardous
material
assessment,
documentation,
reports,
or
abatement
are
ex
cluded.

Schedule 50%
Construction
Documents
will
take
approximately
60 business
days
from
Notice
to
Proceed
(NTP).

Additional
Services
If
additional
work
is
required
beyond
what
is
noted
above,
Kitchell
EAS
will
provide
services
for
these
scope
of
work
items
under
separate
proposals.

Compensation Compensation
for
the
above
scope
shall
be
based
on
a
fixed
fee
in
the
total
amount
of
$11
7,5
00 broken
down
as
follows:

Architectural, Mechanical/Plumbing,
Electrical
Engineering
Structural
Engineering
Civil
Engineering
Topographic
Survey
Sub-Total Reimbursable
Expenses
Total
Basic
Fee
Total
not
to
exceed
fee
for
Project
66,500 11,500 32,500 5,000
$115,500
2,000
$117,500 $153,570
All
of
us
at
Kitchell
are
grateful
for
the
opportunity
to
submit
this
proposal.

Please
do
not
hesitate
to
contact
me
at
any
time
if
you
have
any
questions.

Sincerely, Kevin
Hallock,
AIA,
NCARB,
Assoc.

DBIA
Senior
Architect
Kitchell
CEM
9905
Mira
Mesa
Blvd.

I Suite
300
I San
Diego,
California
92131
I Phone
858
.947.5144
I www.kitchell.com
7 of
32 Page
2 December 16, 2025, Item #5
FEE

SCHEDULE
Re\ls,on
02-11-2025
~
I

6. I
i
1l
i
~
~
!
8"
u
l
I
l5
City
of
Poway
Park
Restroom
~
·[
~
j
5 .§
._
~
~ ~
'!
~
!i,

0. <(
1l
"'
~
~
;,
:~
-~
~
l5
l5
:E
5 ~
l5
i
!
·5
~
-~ ·g,
·5
·gi
·5
~

0. .n:s
"'
"'w
"'w
"'
0 Tota
l Hrs
Tot
al
Fee
Task#
Description
$24

0.00 $2
15 .00
$210.00
$19

5.00 $16

5.00 $19

0.00 $190.00
$125
.00
$150
.00
$95
.00
402
1 Proj
ect
Start
Up

1.1 Kick--off
Meeting
1 1
1 1
1 s
$855

1.2 Pro
ject
Prep
2 2
2 2
1 9
$1
,615

1.4 Pr
oject
Management
4 4
$840
Suf>.Total
7 3
3 3
2 18
$3,310
2 Option
s Design

2. t
Site
Pl
an
2 3
5 $705

2.2 Pl
ans
5 10
15 $2,
07 5

2.3 Details
8 12
20 $2
,820

2.4 QA/QC
2 2
4 $580

2.5 Project
Ma
nage
m
ent
10 6
16 $3,270
Sub•To
ta
l
10 6
17 27
60 $9
,450
3 50
'/,
Construction
Docum
ents

3.1 G
ene
ral Pro
ject
Information
and
Cod
e
Analysis
3 2
2 5
12 $1,8B0

3.2 General
Notes
3 2
2 5
12 $1,
880

3. 3
Site
Pl
an
10 5
5 5
25 $4,175

3.4 Pl
ans
5 10
10 10
35 $5,875

3.5 Details
8 5
5 12
30 $4,720

3.6 Specificatio
ns
12 4
4 3
23 $4,145

3.7 Cales
5 5
10 $1
,900

3.9 QA/QC
4 2
2 4
2 14
$2
,110

3.10 Project
Management
1 8
6 15
$3
,065
Sub
.Total
1 •
18 33
35 35
41 5
176
$29,750
◄
100%
Construction
Docum
ents

4. 1
Sile
Plan
5 2
2 3
12 $1,960

4.2 Plans
6 3
3 5
17 $2,755
◄.3
Details
6 5
5 6
22 $3,640

4.4 Specifications
6 4
3 3
16 $2,785

4.5 Estimating
40 40
S6
,000
◄.6
QA/QC
3 2
2 4
2 13
$1,945

4. 7 Applications
for
Pennit
3 3
$375

4.8 Permit
Re\tslons
3 2
2 4
11 $1,755

4.9 Project
Management
1 8
5 14
$2,870
Sub
-Total
1 8
11 23
18 17
25 ...
5 148
$24,085
5 Construction

5.1 RFI
ReWew

5.2 Submittal
Re-Jew

5.3 Site
Walks
(2)

5.4 Punch
walk
(1)

5.5 Closeout
(Prepare
Record
Drawings)

5.6 Project
Management
Sub-Total
2 33
38 76
56 52
93 40
12 402
66 ,500
$430
$6,930
$7
,410
$12
,540
$10,640
$9,8
80 $11
,625
$6,000
$1,140
66,500
Subconsuhants
Miyamoto
Structural
Engineers
---1-1
.~500~
L3~
3~i~
0::~::~
___
3,,_~
:-~~~o
Expenses
Reimbursa
bte
Expen
ses
A;::~e:e-~s-
11~7 ~.soo~2-,:,~~'""o
8 of
32 December 16, 2025, Item #5
City
of
Poway

STANDARD

AGREEMENT
FOR

SERVICES
This
Agreement,
entered
into
this
3 rd
day
of
September,
2024,
by
and
between
the
CITY
OF
POWAY
(hereinafter
referred
to
as
"City")
and

KITCHELL/GEM,
INC.,(hereinafter
referred
to
as
"Consultant")
.

RECITALS

WHEREAS,
City
desires
to
obtain
the
services
of
a
private
consultant
to
perform
design
services
for
the
Community
Park
Restroom
Project
(Project);

WHEREAS,
Consultant
is
an
engineering
design
consultant
and
has
represented
that
Consultant
possesses
the
necessary
qualifications
to
provide
such
services;
and

WHEREAS,
City
has
authorized
the
preparation
of
an
agreement
to
retain
the
services
of
Consultant
as
hereinafter
set
forth
.

NOW,

THEREFORE,
IT
IS

MUTUALLY
AGREED
THAT
CITY
DOES
HEREBY
RETAIN

CONSULTANT
ON
THE

FOLLOWING
TERMS
AND
CONDITIONS:

1. Scope
of
Services.

Consultant
shall
provide
services
as
described
in
Exhibit
"A"
entitled
"Special
Provisions"
attached
hereto
and
made
a
part
hereof
.

2. Compensation
and
Reimbursement.

City
shall
compensate
and
reimburse
Consultant
as
provided
in
Exhibit
"A"
entitled
"Special
Provisions"
attached
hereto
and
made
a
part
hereof.

3. Term
of
Agreement.

The
term
of
this
Agreement
shall
be
as
described
on
Exhibit
"A"
entitled
"Special
Provisions"
attached
hereto
and
made
a
part
hereof.

4. Termination. This
Agreement
may
be
terminated
with
or
without
cause
by
City.

Termination
without
cause
shall
be
effective
only
upon
60-day
written
notice
to
Consultant.

During
said
60-
day
period
Consultant
shall
perform
all
consulting
services
in
accordance
with
this
Agreement.

This
Agreement
may
be
terminated
by
City
for
cause
in
the
event
of
a
material
breach
of
this
Agreement,
misrepresentation
by
Consultant
in
connection
with
the
formation
of
this
Agreement
or
the
performance
of
services,
or
the
failure
to
perform
services
as
directed
by
City.

Termination
for
cause
shall
be
effected
by
delivery
of
written
notice
of
termination
to
Consultant.

Such
termination
shall
be
effective
upon
delivery
of
said
notice.
1 9
of
32 ATTACHMENT
B
December 16, 2025, Item #5

5. Confidential Relationship.

City may from time to time communicate to Consultant certain information to enable Consultant to effectively perform the services. Consultant shall treat all such information as confidential, whether or not so identified, and shall not disclose any part thereof without the prior written consent of the City. Consultant shall limit the use and circulation of such information, even within its own organization, to the extent necessary to perform the services.

The foregoing obligation of this Paragraph 5, however, shall not apply to any part of the information that (i) has been disclosed in publicly available sources of information; (ii) is, through no fault of Consultant, hereafter disclosed in publicly available sources of information; (iii) is now in the possession of Consultant without any obligation of confidentiality; or (iv) has been or is hereafter rightfully disclosed to Consultant by a third party, but only to the extent that the use or disclosure thereof has been or is rightfully authorized by that third party.

Consultant shall not disclose any reports, recommendations, conclusions or other results of the services or the existence of the subject matter of this contract without the prior written consent of the City. In its performance hereunder, Consultant shall comply with all legal obligations it may now or hereafter have respecting the information or other property of any other person, firm or corpOration.

6. Office Space and Clerical Support.

Consultant shall provide its own office space and clerical support at its sole cost and expense.

7. Covenant Against Contingent Fees.

Consultant declares that it has not employed or retained any company or person, other than a bona fide employee working for Consultant, to solicit or secure this Agreement, that it has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift or any other consideration, contingent upon or resulting from the award or making of the Agreement. For breach of violation of this warranty, City shall have the right to annul this Agreement without liability, or, at its sole discretion, to deduct from the Agreement price or consideration, or otherwise recover the full amount of such fee, commission, percentage, brokerage fee, gift or contingent fee.

8. Ownership of Documents.

All memoranda, reports, plans, specifications, maps and other documents prepared or obtained under the terms of this Agreement shall be the property of City and shall be delivered to City by Consultant upon demand.

9. Conflict of Interest and Political Reform Act Obligations.

During the term of this Agreement Consultant shall not act as consultant or perform services of any kind for any person or entity whose interests conflict in any way with those of the City of Poway. Consultant shall at all times comply with the terms of the Political Reform Act and the local conflict of interest code. Consultant shall immediately disqualify itself and shall not use its official position to influence in any way any matter coming before the City in which the Consultant has a financial interest as defined in Government Code Section 87103.

Consultant represents that it has no knowledge of any financial interests which would require it to disqualify itself from any matter on which it might perform services for the City. 2 10 of 32
December 16, 2025, Item #5
"Consultant"
means
an
individual
who,
pursuant
to
a
contract
with
a
state
or
local
agency
: (A)
Makes
a
governmental
decision
whether
to:

1. Approve
a
rate
, rule
or
regulation
;

2. Adopt
or
enforce
a
law;

3. Issue,
deny,
suspend
, or
revoke
any
permit
, license,
appl
ication,
certificate
, approval,
order,
or
similar
authorization
or
entitlement;

4. Authorize
the
City
to
enter
into
,
mod
ify,
or
renew
a
contract
provided
it is
the
type
of
contract
that
requ
ires
City
approval;

5. Grant
City
approval
to
a
contract
that
requires
City
approval
and
to
which
the
City
is
a
party,
or
to
the
specifications
for
such
a
contract;

6. Grant
City
approval
to
a
plan,
design
, report
, study,
or
similar
item
;

7. Adopt
, or
grant
City
approval
of,
policies
, standards
, or
guidelines
for
the
City,
or
for
any
subdivision
thereof
; or
(B)
Serves
in
a
staff
capac
ity
with
the
City
and
in
that
capacity
participates
in
making
a
governmental
decision
as
defined
in
the
Political
Reform
Act
and/or
implementing
regulations
promulgated
by
the
Fair Political
Practices
Commission,
or
performs
the
same
or
substantially
all
the
same
duties
for
the
City
that
would
otherwise
be
performed
by
an
individual
holding
a
position
specified
in
the
City
's Conflict
of
Interest
Code
.

DISCLOSURE

DETERMINATION
:
18!

1. Consultant/Contractor
will
not
be
"making
a
government
decision
"
or
"serving
in
a
staff
capacity
" as
defined
in
Sections
A
and
B
above
.

No
disclosure
required.

D

2. Consultant/Contractor
will
be
"making
a
government
decis
ion"
or
"serving
in
a
staff
capacity
"
as
defined
in
Sections
A
and
B
above.

As
a
result
,
Consultant/Contractor
shall
be
required
to
file
a
Statement
of
Economic
Interest
with
the
City
Clerk
of
the
City
of
Poway
in
a timely
manner
as
required
by
law
.
(~~
• 1.::=J~
'-------L
I
__,
\
--\.
-
Ju~>eopio,
Director
of~~opment
Services
10 .

No
Assignments.

Neither
any
part
nor
all
of
this
Agreement
may
be
assigned
or
subcontracted,
except
as
otherwise
specifically
provided
herein
, or
to
which
City,
in
its
sole
discretion,
consents
to
in
advance
thereof
in
writing.

Any
ass
ignment
or
subcontracting
in
violat
ion
of
this
provision
shall
be
void
.

11. Maintenance of
Records
.

Consultant
shall
maintain
all
books
, documents
, papers,
employee
time
sheets
,
accounting
records,
and
other
evidence
pertaining
to
costs
incurred
and
shall
make
such
materials
available
at
its
office
at
all
reasonable
times
during
the
contract
per
iod
and
for
three
3 11
of
32 December 16, 2025, Item #5
(3)
years
from
the
date
of
final
payment
under
this
Agreement,
for
inspection
by
City
and
copies
thereof
shall
be
furnished,
if requested.

12. Independent
Contractor.

At
all
times
during
the
term
of
this
Agreement,
Consultant
shall
be
an
independent
contractor
and
shall
not
be
an
employee
of
the
City
of
Poway.

City
shall
have
the
right
to
control
Consultant
only
insofar
as
the
results
of
Consultant's
services
rendered
pursuant
to
this
Agreement
;
however,
City
shall
not
have
the
right
to
control
the
means
by
which
Consultant
accomplishes
such
services.

13. Licenses,
Permits,
Etc.

Consultant
represents
and
declares
to
City
that
it
has
all
licenses,
permits,
qualifications,
and
approvals
of
whatever
nature
that
are
legally
required
to
practice
its
profession
.

Consultant
represents
and
warrants
to
City
that
Consultant
shall,
at
its
sole
cost
and
expense,
keep
in
effect
at
all
times
during
the
term
of
this
Agreement,
any
license,
permit,
or
approval
which
is
legally
required
for
Consultant to
practice
its
profession
.

14. Consultant's
Insurance.

Consultant
shall
provide
insurance
as
set
forth
in
Exhibit
"A"
entitled
"Special
Provisions"
attached
hereto
and
made
a
part
hereof.

15. Indemnification.
(a)
For
Claims
(as
defined
herein)
other
than
those
alleged
to
arise
from
Consultant's
negligent
performance
of
professional
services,
City
and
its
respective
elected
and
appointed
boards,
officials,
officers,
agents,
employees
and
volunteers
(individually
and
collectively,
"lndemnitees")
shall
have
no
liability
to
Consultant
or
any
other
person
for,
and
Consultant
shall
indemnify,
protect
and
hold
harmless
lndemnitees
from
and
against,
any
and
all
liabilities,
claims,
actions,
causes
of
action,
proceedings,
suits,
damages,
judgments,
liens,
levies,
costs
and
expenses,
including
reasonable
attorneys'
fees
and
disbursements
(collectively
"Claims"),
which
lndemnitees
may
suffer
or
incur
or
to
which
lndemnitees
may
become
subject
by
reason
of
or
arising
out
of
any
injury
to
or
death
of
any
person(s),
damage
to
property,
loss
of
use
of
property,
economic
loss
or
otherwise
occurring
as
a
result
of
Consultant's
negligent
performance
under
this
Agreement,
or
by
the
negligent
or
willful
acts
or
omissions
of
Consultant,
its
agents,
officers,
directors,
sub-consultants
or
employees.
(b)
For
Claims
alleged
to
arise
from
Consultant's
negligent
performance
of
professional
services,
lndemnitees
shall
have
no
liability
to
Consultant
or
any
other
person
for,
and
Consultant
shall
indemnify
and
hold
harmless
lndemnitees
from
and
against,
any
and
all
Claims
that
lndemnitees
may
suffer
or
incur
or
to
which
lndemnitees
may
become
subject
by
reason
of
or
arising
out
of
any
injury
to
or
death
of
any
person(s),
damage
to
property,
loss
of
use
of
property,
economic
loss
or
otherwise
to
the
extent
occurring
as
a
result
of
Consultant's
negligent
performance
of
any
professional
services
under
this
Agreement,
or
by
the
negligent
or
willful
acts
or omissions
of
Consultant,
its
agents,
officers,
directors,
sub-consultants
or
employees,
committed
in
performing
any
of
professional
services
under
this
Agreement.

For
Claims
alleged
to
arise
from
Consultant's
professional
services,
Consultant's
defense
obligation
to
lndemnitees
shall
include
only
the
reimbursement
of
reasonable
defense
costs
and
attorneys'
fees
to
the
extent
caused
by
Consultant's
negligence.
4 12
of
32 December 16, 2025, Item #5
(c)
The
foregoing
obligations
of
Consultant
shall
not
apply
to
the
extent
that
the
Claims
arise
from
the
sole
negligence
or
willful
misconduct
of
City
or
its
elected
and
appointed
boards,
officials,
officers,
agents,
employees
and
volunteers.
(d)
In
qny
and
all
Claims
against
City
by
any
employees
of
the
Consultant,
anyone
directly
or
indirectly
employed
by
it
or
anyone
for
whose
acts
it
may
be
liable,
the
indemnification
obligation
under
this
Section
15 shall
not
be
limited
in
any
way
by
any
limitation
on
the
amount
or
type
of
damages,
compensation
or
benefits
payable
by
or
for
the
Consultant
under
worker's
compensation
acts,
disability
benefit
acts
or
other
employee
benefit
acts
.
(e)
Consultant
shall,
upon
receipt
of
written
notice
of
any
Claim,
promptly
take
all
action
necessary
to
make
a
claim
under
any
applicable
insurance
policy
or
policies
Consultant
is
carrying
and
maintaining;
however,
if
Consultant
fails
to
take
such
action
as
is
necessary
to
make
a
claim
under
any
such
insurance
policy,
Consultant
shall
reimburse
City
for
any
and
all
costs,
charges,
expenses
, damages
and
liabilities
incurred
by
City
in
making
any
claim
on
behalf
of
Consultant
under any
insurance
policy
or
policies
required
pursuant
to
this
Agreement.
(f)
The
obligations
described
in
Section
15(a)
through
(e)
above
shall
not
be
construed
to
negate,
abridge
or
otherwise
reduce
any
other
right
or
obligation
of
indemnity
which
would
otherwise
exist
as
to
any
party
or
person
indemnified
pursuant
to
this
Section

15. (g)
The
rights
and
obligations
of
the
parties
described
in
this
Section
15 shall
survive
the
termination
of
this
Agreement.

16. Assumption
of
Risk.

Except
for
injuries
to
persons
caused
by
the
willful
misconduct
of
any
lndemnitee
and
not
covered
by
insurance
maintained,
or
required
by
this
Agreement
to
be
maintained,
by
Consultant:
(a)
Consultant
hereby
assumes
the
risk
of
any
and
all
injury
and
damage
to
the
personnel
(including
death)
and
property
of
Consultant
that
occurs
in
the
course
of,
or
in
connection
with,
the
performance
of
Consultant's
obligations
under
this
Agreement,
including
but
not
limited
to
Consultant's
Scope
of
Services;
and
(b)
it
is
hereby
agreed
that
the
lndemnitees
are
not
to
be
liable
for
injury
or
damage
which
may
be
sustained
by
the
person
,
goods
or
property
of
Consultant
or
its
employees
in
connection
with
Consultant's
performance
its
obligations
under
this
Agreement,
including
but
not
limited
to
Consultant's
Scope
of
Services.

17. Consultant
Not
an
Agent.

Except
as
City
may
specify
in
writing
,
Consultant
shall
have
no
authority,
expressed
or
implied,
to
act
on
behalf
of
City
in
any
capacity
whatsoever
as
an
agent.

Consultant
shall
have
no
authority,
expressed
or
implied,
pursuant
to
this
Agreement
to
bind
City
to
any
obligation
whatsoever.

18. Personnel. Consultant
shall
assign
qualified
and
certified
personnel
to
perform
requested
services.

The
City
shall
have
the
right
to
review
and
disapprove
personnel
for
assignment
to
Poway
projects
. City
shall
have
the
unrestricted
right
to
order
the
removal
of
any
person(s)
assigned
by
Consultant
by
giving
oral
or
written
notice
to
Consultant
to
such
effect.
5 13
of
32 December 16, 2025, Item #5
Consultant
's
personnel
shall
at
all
times
comply
with
City's
drug
and
alcohol
policies
then
in
effect.

19. Notices. Notices
shall
be
given
as
described
on
Exhibit
"A"
entit
led
"Special
Provis
ions"
attached
hereto
and
made
a
part
hereof.

20. Governing
Law,
Forum
Selection
and
Attorneys'
Fees
.

This
Agreement
shall
be
governed
by
, and
construed
in
accordance
with
, the
laws
of
the
State
of
California.

Each
party
to
this
Agreement
consents
to
personal
jurisdiction
in
San
Diego
County,
California,
and
hereby
authorizes
and
accepts
service
of
process
sufficient
for
personal
jurisdiction
by
first
class
mail
, registered
or
certified,
postage
prepaid,
to
its
address
for
giving
not
ice
as
set
forth
in
Exhibit
"A"
hereto
.

Any
action
to
enforce
or
interpret
the
terms
or
conditions
of
this
Agreement
shall
be
brought
in
the
Super
ior
Court
in
San
Diego
County,
Central
Division
,
unless
the
parties
mutually
agree
to
submit
their
dispute
to
arbitration
.

Consultant
hereby
waives
any
right
to
remove
any
such
action
from
San
Diego
County
as
is
otherwise
permitted
by
California
Code
of
Civil
Procedure
section
394
.

The
prevailing
party
iD
any
such
action
or
proceeding
shall
be
entitled
to
recover
all
of
its
reasonable
litigation
expenses,
including
its
expert
fees,
attorneys'
fees
, courts
costs,
arbitration
costs,
and
any
other
fees
.

Notwithstanding
the
foregoing,
in
the
event
that
the
subject
of
such
an
action
is
compensation
claimed
by
Consultant
in
the
event
of
termination,
Consultant's
damages
shall
be
limited
to
compensation
for
the
60-day
period
for
which
Consultant
would
have
been
entitled
to
receive
compensat
ion
if terminated
without
cause
, and
neither
party
shall
be
entitled
to
recover
their
litigation
expenses.

21. Gender
.

Whether
referred
to
in
the
masculine,
feminine,
or
as
"it
," "Consultant"
shall
mean
the
individual
or
corporate
consultant
and
any
and
all
employees
of
consultant
providing
services
hereunder. 22.

Counterparts. This
Agreement
(and
any
amendments)
may
be
executed
in
multiple
counterparts,
each
of
which
shall
be
deemed
an
original
,
but
all
of
which,
together,
shall
constitute
one
and
the
same
instrument.

Documents
delivered
by
telephonic
facsimile
transmission
shall
be
valid
and
binding
.
23 .

Entire
Agreement.

This
Agreement
shall
constitute
the
entire
understanding
between
Cons
ultant
and
City
relating
to
the
terms
and
conditions
of
the
services
to
be
performed
by
Consultant.

No
agreements,
representations
or
promises
made
by
either
party,
whether
oral
or
in
writing,
shall
be
of
any
force
or
effect
unless
it is
in
writing
and
executed
by
the
party
to
be
bound
thereby.

24. Certification
and
Indemnification
Regarding
Public
Employees'
Retirement
Law/Pension
Reform
Act
of
2013
.

Contractor
hereby
certifies
that
all
persons
providing
services
to
City
by
Contractor
are
not
current
members
of
the
California
Public
Employees
' Retirement
System
(CalPERS)
and
shall
not
become
members
of
Cal
PERS
while
providing
services
to
City
.
6 14
of
32 December 16, 2025, Item #5
Contractor
further
provides
that
in
the
event
Contractor
assigns
a
retired
annuitant
receiving
a
pension
benefit
from
CalPERS
to
perform
services
for
City,
the
retired
annuitant
is
in
full
compliance
with
Government
Code
section
7522
.56.

A
copy
of
Government
Code
section
7522.56
is
attached
hereto
as
Exhibit
"B."
Further,
Contractor
hereby
fully
and
unconditionally
indemnifies
City
from
all
penalties,
fees,
employer
and
employee
contributions,
or
any
other
assessments
imposed
by
CalPERS
in
the
event
CalPERS
determines
the
person
assigned
by
Contractor
to
provide
services
to
City
has
been
misclassified
.

25. Severability.

If
any
provision
of
this
Agreement
is
determined
by
any
court
of
competent
jurisdiction
or
arbitrator
to
be
invalid,
illegal,
or
unenforceable
to
any
extent,
that
provision
shall,
if
possible,
be
construed
as
though
more
narrowly
drawn,
if
a
narrower
construction
would
avoid
such
invalidity,
illegality,
or
unenforceability
or,
if
that
is
not
possible,
such
provision
shall,
to
the
extent
of
such
invalidity,
illegality,
or
unenforceability,
be
severed,
and
the
remaining
provisions
of
this
Agreement
shall
remain
in
effect.
•
(Remainder
of
page
intentionally
left
blank)
7 15
of
32 December 16, 2025, Item #5
IN

WITNESS

WHEREOF,
the
parties
hereto
have
duly
executed
this
Agreement
on
the
date
first
above
written
.

CITY
OF
POWAY

KITCHELL/CEM,
INC.

B • 11
J
h
I
Digitally
signed
by
Bill
Johal
I O
a
Dat
,e:
~024.09.04
21 :57:0
2 By
:
-0100
Bikramjit
Johal,
Vice
President
Date
: ---=-
lo_..,.{ _l _t\.=+-I ---''1-0=---Z-1----+----
•
I
Date
: 09/04/2024
ATTEST: APPROVED
AS
TO
FORM:

Ok.~
By:
____________
_
Alan
Fenstermacher
, City
Attorney
8 16
of
32 December 16, 2025, Item #5
"SPECIAL
PROVISIONS"

EXHIBIT
"A"
A.

Scope
of
Services.

Consultant
agrees
to
perform
consulting
services
as
required
by
City,
which
shall
consist
of
the
design
services
further
described
in
the
Scope
of
Services
submitted
with
the
proposals,
which
is
included
in
this
document
as
Attachment
1,
and
incorporated
by
reference,
as
if
its
contents
were
fully
set
forth
herein
.

Consultant
shall
provide
the
necessary
qualified
personnel
to
perform
the
services.

B.

Compensation
and
Reimbursement.

City
shall
pay
Consultant
a
fee
in
accordance
with
the
Fee
Proposals
submitted
with
the
proposals, which
are
included
in
this
document
as
Attachment

2. Total
fee
is
not
to
exceed
Twenty-Thousand
Eight-Hundred
and
Thirty
Dollars
($20,830)
. Consultant's
fee
shall
include
and
Consultant
shall
be
responsible
for
the
payment
of
all
federal,
state,
and
local
taxes
of
any
kind
which
are
attributable
to
the
compensation
received.

In
addition
to
said
consulting
fee,
Consultant
shall
be
reimbursed
for
all
reasonable
expenses,
including
lodging,
telephone,
and
travel
(air,
auto,
rail)
necessarily
incurred
in
performance
of
the
services.

Consultant
shall
bill
City
for
such
expenses
as
incurred,
referencing
this
Agreement.

All
expenses
shall
be
itemized
and
supported
by
receipts
for
amounts
in
excess
of
Twenty-Five
Dollars
($25.00)
.

Statements
for
reimbursement
of
expenses
shall
be
paid
within
ten
(10)
days
of
approval
by
City.

All
air
travel
shall
be
billed
at
coach
or
special
fare
rates
.

Reimbursement
for
lodging
is
limited
to
travel
from
outside
of
San
Diego
County
. Consultant
shall
receive
prior
authorization
for
air
travel
and
lodging
expenses
. All
other
expenses
shall
be
reimbursed
in
accordance
with
City's
cash
disbursement
policies
in
effect
at
the
time
incurred
.

C.

Term
of
Agreement.

This
Agreement
shall
commence
and
be
effective
as
of
September
3,
2024
("Effective
Date"),
and
shall
automatically
terminate
upon
completion
of
the
Project,
as
determined
by
the
City
in
its
sole
discretion,
unless
sooner
terminated
by
City
as
provided
in
the
section
of
this
Agreement
entitled
"Termination."
Upon
the
termination
of
this
Agreement,
Consultant
shall
return
to
City
any
and
all
equipment,
documents
or
materials
and
all
copies
made
thereof
which
Consultant
received
from
City
or
produced
for
City
for
the
purposes
of
this
Agreement.

D.

Consultant's
Insurance.

1. Coverages: Consultant
shall obtain
and
maintain during
the
life
of
this
Agreement
all
of
the
following
insurance
coverages:
(a)
Comprehensive
General
Liability,
including
premises-operations,
products/completed,
broad
form
property
damage,
and
blanket
contractual
liability
with
the
17 of
32 December 16, 2025, Item #5
following coverages: General Liability $1,000,000 Bodily Injury and Property Damage combined each occurrence and $2,000,000 aggregate.
(b) Automobile Liability, including owned, hired, and non-owned vehicles: $1,000,000 combined single limit.
(c) Consultant shall obtain and maintain, during the life of the Agreement, a policy of Professional Errors and Omissions Liability Insurance with policy limits of not less than $1,000,000 combined single limits, per claim and annual aggregate. (d) Workers' Compensation insurance in statutory amount. All of the endorsements which are required above shall be obtained for the policy of Workers' Compensation insurance.

2. Endorsements:

Endorsements shall be obtained so that each policy contains the following three provisions:
(a) Additional Insured. (Not required for Professional Errors and Omissions Liability Insurance or Workers' Compensation.) "City of Poway and its elected and appointed boards, officers, agents, and employees are additional insureds with respect to this subject project and contract with City." (b) Notice.
"Said policy shall not terminate, nor shall it be canceled, until thirty (30) days after written notice is given to City."
(c) Primary Coverage.
"The policy provides primary coverage to City and its elected and appointed boards, officers, agents, and employees. It is not secondary or in any way subordinate to any other insurance or coverage maintained by City."

3. Insurance Certificates:

Consultant shall provide City certificates of insurance showing the insurance coverages described in the paragraphs above, in a form and content approved by City, prior to beginning work under this Agreement.

E. Notices.

All notices, billings and payments hereunder shall be in writing and sent to the following addresses:

To City:

To Consultant:
2 18 of 32
City of Poway -Development Services
13325 Civic Center Drive
Poway, CA 92064
Kitchell/CEM, Inc.
2450 Venture Oaks Way, Suite 500
Sacramento, CA 95833
December 16, 2025, Item #5
Atta
chm
ent
1 7.
~-.\ rict,,i
lcd
dcscr
ipliu11 ;Jf i11<
0 ,rnp,' ;if
,.-:or,,
JS
01Hlirwrl
i11 tile 'Scop
,· of S,
0 1

1.'iC.:,·
,c,liun c,rn
tainc<i in
thi
s docwil
clH.
111duJi11g
urn~
lincs
.rnd
iiel1·1er;
!iilcs
.

SCOPE
OF
WORK
Project
Approach
It is
our
understanding
that
the
City
of
Poway
is
seeking
a qualified
firm
to
provide
design
services
for
the
Community
Park
Restroom
project.

It
is our
understanding
that
the
City
is
looking
to
install
a restroom
on
the
northwest
side
of
Community
Park
and
are
considering
two
options
: 1)
converting
the
exist
ing
bocce
ball
storage
room
into
a restroom
; or
2)
installing
a
new
prefabricated
restroom
at
the
northeast
corner
of
the
bocce
ball
cou
rt. Kitch
ell's
design
approach
emphasizes
continuous
communication
between
the
City
and
our
design
team
. We
believe
in
providing
value
for
every
dollar
the
City
spends
on
design
and
construction
. As
a result,
we
are
continuously
reviewing
design
assumptions,
material
selection,
and
equipment
to
provide
ma
ximum
value.

We
constantly
review
ou
r details
to
ensure
they
are
constructible
. Kitchell
typically
starts
all
our
projects
with
site
surveys
to
ascertain
existing
building
systems.

Our
design
process
is
a team
approach
that
encompasses
the
owner,
users,
peer
reviewers,
agencies,
sub
consultants,
and
the
design
team
.

1. Preliminary
Engineering
and
Conceptual
Phase
We
will
meet
with
the
City
to
ensure
everyone
is
clear
on
the
goals,
communication
protocols
are
established,
work
activities
are
reviewed
and
confirmed,
schedule
milestones
are
reviewed
and
confirmed
and
desired
outcomes
are
established
. We
will
request
and
review
av
ailable
project
do
cumentation,
including
as-built
documents,
utility
information,
survey
information,
and
any
oth
er records
. This
documentation
will
establish
baseline
information
for
planning
our
work
- a
point
of
beginning
.

Once
all
of
the
available
data
from
the
City
has
been
received
and
reviewed,
we
will
facilitate
a project
kick
-off
meeting
and
a
concept-level
design
wo
rkshop
with
Kitchell,
the
City
, and
all
Team
Members.

We
want
to
ensure
that together
we
tailor
the
project
to
efficiently
deliver
those
services
that
provide
the
highest
value
to
you,
while
conforming
to
you
r budget.

After
the
kick-off
meeting
and
concept-level
design
workshop
our
Team
will
complete
a facility
evaluation
on
the
project.

Prior
tq
our
evaluation,
we
will
coordinate
our
arrival
schedule
with
the
City.

During
the
evaluation
, we will
assess
existing
conditions
of
the
project
area
and/or
identify
physical
deficiencies
and
any
unusual
features
.

We
will
evaluate
the
existing
condit
ions
of
the
project
and
provide
recommendations
that
will
fulfill
the
City's
project
goals.

We
will
also
identify
site-specific
special
conditions
that
may
create
conflicts
or
change
orders
during
construction,
as
well
as
identify
how
risks
can
be
mitigated
.
19 of
32 December 16, 2025, Item #5
Our design team will prepare conceptual documents for both options consisting of drawings and renderings illustrating the general scope, scale, and relationship of project components for approval by the City. The design shall include the following: conceptual site and building plans, development of approximate dimensions, areas, and volumes; development of conceptual design solutions for energy sources/conservation, heating, ventilating and air conditioning (HVAC), plumbing, and fire protection; and development of conceptual design solutions or power service and distribution, lighting, communication raceways, security electronics, fire detection and alarms.

The cost estimates at the preliminary engineering and conceptual phase shall reflect the level of design elements presented in the conceptual design documents, plus appropriate design contingencies to encompass the unidentified scope ultimately included in the program. Once we have received approval from the City, we will move into the schematic design documents phase.

2. Schematic Design (30% PSE) Documents Phase
During the schematic design phase, l(itchell will prepare documents consisting of drawings, outline specifications, and other documents illustrating the general scope, scale, and relationship of project components for approval by the City.

Schematic design shall include the following:

Architectural Design: further development of site and building plans, schematic sections and elevations, preliminary selection ofbuilding systems and material, further development.of approximate dimensions, areas and volumes.

Civil/Site Design (as needed): preliminary grading, location of paving for walkways, and fencing locations. Also included are the connections required to service the buildings such as water, drainage, and sanitary systems. ~ Structural Design (as needed): recommendations regarding basic structural material and systems, analysis, and development of conceptual design solutions.
► Mechanical Design: further development of heating, ventilating and air conditioning (HVAC), plumbing, and fire protection.
~ Electrical Design: further development of power service and distribution, lighting, communication raceways, fire detection and alarms.
~ Cost Estimating: costs shall reflect the level of design elements presented in the schematic design documents, plus appropriate design contingencies to encompass unidentified scope ultimately included in the program. Will assist the City with analyzing scope, schedule, and budget options to stay within the construction cost.

3. Project Management
Throughout the design phase our project manager will facilitate conference calls with you1· team to update the City of the project progress, and schedule status. At this time, our project manager will ask any questions or discuss issues encountered. At every meeting with the City, Kitchell will ensure notes are kept and meeting summaries distributed within 48-hour turnaround.

We will coordinate meeting with the City to review the preliminary design submittals. We will utilize a comment and response log of the City's comments during each submittal and re-issue the log in the subsequent submittal.

Every site visit attended by Kitchell will be followed by a site visit report which will be distributed within 48 hours of each meeting and include photo documentation of progress and issues discussed. Our operations manager reviews the master design schedule every two weeks to ensure client deadlines are met. The quality control process that Kitchell has put in place has been designed to catch errors as the design progresses and not during construction which results in delays and added costs.
01 (◄ i £3 : i :J ! !
20 of 32
December 16, 2025, Item #5
N .....
0 ....
w
N
Kitchell Fee Proposal
Hours by Dlsclpline
Klclc-otf Meel!ng
CrQatc ease Drawings
Site Walk
Monthly Progress Conference Coils (Assume 2 meeUngs}
M<!et wl1h City to review concept level designs and renderings Coord inate vtlth AHJ
General Project Information and Code Analysis T
Develop Concep t Level Designs and Renderfngs I
Develop 30% Early Schemo.lic Package I
Cos\ Estimate r
~ 1 : ◄ i ,3 : 1 ~ ! !
2 5
II II
1 II •
4 15 10 10
.. ... ' II
1 1 1
1 1
2 2
2 1
1 3
. .. : ti . .. . ..
1 1
3 3
4 2 2
0 4 24 39 10 0
. , • II
1 1
2 B
2 2
1 .. .. ... ...
21 41 I I
Bl 16 I
4 GI 10 I
I 10 I
8 ..
2 . ..
4 Sub-Total
Project Hours
(By Task)
1l1
• 1'i1
5 12
G
4 2
0 7
..
8 30
32 10
Sub.Total Project
Fee (By Task)
S865
S1,620
S1,110
S770
S385
so
s1.ns
.

Sl.180
$4,350
$4,430
S1,750
I{ E O l / F '., l F O I{ I' H O I' ()<;,\ L ;,! 0 . . / ,; • 0 0 I • CO ,·,I 1\'1 U ; ! I I' Y f' ,\ 11 1: il [ S I i·: r r /JI·,, ~
(')
::r
3 CD
::::i .....

N
December 16, 2025, Item #5

EXHIBIT
"B"
Cal
Gov
Code§
7522.56
Deering's
California
Codes
are
current
through
all
1016
chapters
of
the
2018
Regular
Session
and
the
November 6,
2018
Ballot
Measures.

Deering's
California
Codes
Annotated>

GOVERNMENT
CODE>
Title
I General>
Division
7 Miscellaneous>
Chapter
21 Public
Pension
and
Retirement
Plans>
Article
4 Califomia
Public
Employees'
Pe11sio11
Reform
Act
of
2013
§ 7522.56.

Provisions
applicable
to
person
receiving
pension benefit
from
public
retirement
system;
Section
supersedes
conflicting
provisions
22 of
32 (a)This
section
shall
apply
to
any
person
who
is
receiving
a pension
benefit
from
a public
retirement
system
and
shall
supersede
any
other
provision
in
conflict
with
this section.
(b)
A
retired
person
shall
not
serve,
be
employed
by,
or
be
employed
through
a contract
directly
by,
a public
employer
in
the
same
public
retirement
system
from
which
the
retiree
receives
the
benefit
without
reinstatement
from
retirement,
except
as
permitted
by
this
section. (c)
A
person
who
retires
from
a public
employer
may
serve
without
reinstatement
from
retirement
or
loss
or
interruption
of
benefits
provided
by
the
retirement
system
upon
appointment
by
the
appointing
power
of
a public
employer
either
during
an
emergency
to
prevent
stoppage
of
public
business
or
because
the
retired
person
has
skills
needed
to
perform
work
of
limited
duration.
(d)Appointments
of
the
person
authorized
under
this
section
shall
not
exceed
a total
for
all
employers
in
that
public
retirement
system
of
960
hours
or
other
equivalent
limit,
in
a
calendar or
fiscal
year,
depending
on
the
administrator
of
the
system.

The
rate
of
pay
for
the
employment
shall
not
be
less
than
the
minimum,
nor
exceed
the
maximum
, paid
by
the
employer
to
other
employees
performing
comparable
duties
, divided
by
173.333
to
equal
an
hourly
rate.

A
retired
person
whose
employment
without
reinstatement
is
authorized
by
this
section
shall
acquire
no
service
credit
or
retirement
rights
under
this
section
with
respect
to
the
employment
unless
he
or
she
reinstates
from
retirement.
(e)
(!)Notwithstanding
subdivision
(c),
any
retired
person
shall
not
be
eligible
to
serve
or
be
employed
by
a public
employer
if,
during
the
12-month
period
prior
to
an
appointment
described
in
this
section
, the
retired
person
received
any
unemployment
insurance
compensation
arising
out
of
prior
employment
subject
to
this
section
with
December 16, 2025, Item #5
23 of
32 Cal
Gov
Code
§ 7522.56
a public
employer.

A
retiree
shall
certify
in
writing
to
the
employer
upon
accepting
an
offer
of
employment
that
he
or
she
is
in
compliance
with
this
requirement.
(2)A
retired
person
who
accepts
an
appointment
after
receiving
unemployment
insurance
compensation
as
described
in
this
subdivision
shall
terminate
that
employment
on
the
last
day
of
the
current
pay
period
and
shall
not
be
eligible
for
reappointment
subject
to
this
section
for
a
period
of
12 months
following
the
last
day
of
employment.
(f)A
retired
person
shall
not
be
eligible
to
be
employed
pursuant
to
this
section
for
a
period
of
180
days
following
the
date
of
retirement
unless
he
or
she
meets
one
of
the
following
conditions:
(l)The
employer
certifies
the
nature
of
the
employment
and
that
the
appointment
is
necessary
to
fill
a critically
needed
position
before
180
days
have
passed
and
the
appointment
has
been
approved
by
the
governing
body
of
the
employer
in
a public
meeting.

The
appointment
may
not
be
placed
on
a consent
calendar.
(2)
(A)Except
as
otherwise
provided
in
this
paragraph,
for
state
employees
, the
state
employer
ce1tifies
the
nature
of
the
employment
and
that
the
appointment
is
necessary
to
fill
a critically
needed
state
employment
position
before
180
days
have
passed
and
the appointment
has
been
approved
by
the
Department
of
Human
Resources
. The
department
may
establish
a process
to
delegate
appointing
authority
to
individual
state
agencies,
but
shall
audit
the
process
to
determine
if
abuses
of
the
system
occur.

If
necessary
, the
department
may
assume
an
agency's
appointing
authority
for
retired
workers
and
may
charge
the
department
an
appropriate
amount
for
administering
that
authority
.
(B)For
legislative
employees,
the
Senate
Committee
on
Rules
or
the
Assembly
Rules
Committee
ce1tifies
the
nature
of
the
employment
and
that
the
appointment
is
necessary
to
fill
a
critically
needed
position
before
180
days
have
passed
and
approves
the
appointment
in
a
public
meeting.

The
appointment
may
not
be
placed
on
a consent
calendar.
(C)For
employees
of
the
California
State
University,
the
Trustees
of
the
California
State
University
certifies
the
nature
of
the
employment
and
that
the
appointment
is
necessary
to
fill
a critically
needed
position
before
I 80
days
have
passed
and
approves
the
appointment
in
a
public
meeting.

The
appointment
may
not
be
placed
on
a consent
calendar.
(3)The
retiree
is
eligible
to
participate
in
the
Faculty
Early
Retirement
Program
pursuant
to
a
collective
bargaining
agreement
with
the
California
State
University
that
existed
prior
to
January
1,
2013,
or
has
been
included
in
subsequent
agreements.
2 December 16, 2025, Item #5
Cal
Gov
Code
§ 7522.56
(4)The
retiree
is
a
public
safety
officer
or
firefighter
hired
to
perform
a function
or
functions
regularly
performed
by
a public
safety
officer
or
firefighter.
(g)A
retired
person
who
accepted
a
retirement
incentive
upon
retirement
shall
not
be
eligible
to
be
employed
pursuant
to
this
section
for
a period
of
180
days
following
the
date
ofretirement
and
subdivision
(f)
shall
not
apply
.
(h)This
section
shall
not
apply
to
a
person
who
is
retired
from
the
State
Teachers'
Retirement
System,
and
who
is
subject
to
Section
24214,
24214
.5
or
26812
o{the
Education
Code
.
(i)This
section
shall
not
apply
to
(I)
a subordinate
judicial
officer
whose
position
, upon
retirement,
is
converted
to
a judgeship
pursuant
to
Section
69615,
and
he
or
she
returns
to
work
in
the
converted
position,
and
the
employer
is
a trial
court,
or
(2)
a retiree
of
the
Judges'
Retirement
System
or
the
Judges'
Retirement
System
II
who
is
assigned
to
serve
in
a
court
pursuant
to
Section
68543
.5.

History Added
Stats
2012
ch
296
§
15 (AB
340).
effective
January
I,
2013
. Amended
Stats
2013
ch
528
§
II
(SB
13),
effective
October
4,
2013
(ch
528
prevails);
ch
76 §
75 (AB
383),
effective
January
1,
2013;
Stats
2014
ch
238
§ 1 (AB
2476),
effective
January
1,
2015.

Annotations Notes
Amendments: Note--
Amendments: 2013
Amendment:

Substituted
(I)
"have
passed"
for
"has
passed"
in
the
first
sentence
of
subds
(f)(l)
and
(f)(2);
(2)
"or
firefighter
hired
to
perform
a
function
or
functions
regularly
performed
by
a
public
safety
officer
or
firefighter"
for
"of
firefighter"
in
subd
(f)(
4 );
and
(3)
"Judges'
Retirement
System"
for
"Judges'
Retirement
System
I"
in
subd
(i).
3 24
of
32 December 16, 2025, Item #5

CITY OF POWAY
Amendment No. 1
PROJECT: Community Park Restroom
ACCOUNT NO.

PO NUMBER:

CONSUL TANT:

ADDRESS:

PK025
2250191
Kitche/1/CEM, Inc.
9915 Mira Mesa Blvd. Suite 300, San Diego, CA 92131
This will serve as your Notice to Proceed for Amendment No. 1 for the Community Park Restroom project. The amended scope and basis of payment shall be in accordance with the not-to-exceed fee of $15,240.00 as provided in the enclosed copy of your proposal dated April 9, 2025. The revised total not-to-exceed fee for the project is $36,070.00. This constitutes full and complete compensation for all new work covered by this Amendment No. 1.

RECOMMENDED BY: APPROVED BY:

Cassandra Seaboch April 21, 2025 Consultant's approval is on proposal attached.

PROJECT MANAGER (DATE) CONSUL TANT (DATE)
25 of 32 ATTACHMENT C
December 16, 2025, Item #5
April
9,
2025
Cassie
Seaboch
Assistant
Engineer
City
of
Poway
13325
Civic
Center
Drive
Poway,
CA
92064
RE:

Fee
Proposal
-
Professional
Design
Services
City
of
Poway
Park
Restroom
Dear
Ms.

Seaboch,
We
want
to
thank
you
for
the
opportunity
to
submit
this
fee
proposal
to
provide
preliminary
design
services
for
the
Poway
Park
Restroom
Project.

Project
Understanding
Kitchell
understands
the
City
wants
to
investigate
a
ground-up
option
for
the
restroom
building
at
Poway
Park.

Kitchell
will
develop
an
option
of
the
two-compartment
stand-alone
restroom
building
that
will
incorporate
design
elements
from
the
nearby
community
center
to
tie
in
with
the
existing
architectural
vernacular. Scope
of
Services
The
following
scope
of
work
will
be
included
in
this
project:
•
Prepare
a
preliminary
design
package
for
a
ground
up
restroom
building
option
as
follows:
o
Two
-compartment
toilet
building
with
storage.
o
Incorporate
exterior
fenestration
and
details
to
match
theming
of
the
nearby
community
center
.
o
Provide
a
30%
early
schematic
set
of
drawings
that
will
include
a
site
plan,
floor
plan,
and
interior
and
exterior
elevations.
o
Exterior
renderings
showing
color
and
materials.
o
Provide
an
updated
cost
estimate
for
construction
Clarifications The
scope
of
work
as
described
in
the
Scope
of
Services
section
above
is
further
clarified
as
follows:
•
Existing
field
conditions
will
be
based
on
a
Kitchell's
previous
site
visits
and
information
provided
by
the
City.
•
City
will
provide
confirmation
of
utility
(water,
sewer,
and
electrical)
points
of
connections.
•
Kitchell
assumes
there
is
an
accessible
path
of
travel
from
the
bocci
ball
court
to
the
community
center
Kitchell
CEM
9915
Mira
Mesa
Blvd.

I Suite
300
I San
Diego,
California
92131
I Phone
858.947.5144
I www
.k
itchell.com
Page
1 26
of
32 December 16, 2025, Item #5
parking lot.

Schedule
Design Documents will take approximately 30 business days from Notice to Proceed (NTP).

Additional Services
If additional work is required beyond what is noted above, Kitchell EAS will provide services for these scope of work items under separate proposals.

Compensation
Compensation for the above scope shall be based on a fixed fee in the total amount of $15,240.00 (Attachment A)
All of us at Kitchell are grateful for the opportunity to submit this proposal. Please do not hesitate to contact me at any time if you have any questions.

Sincerely,
Kevin Hallock, AIA, NCARB, Assoc. DBIA
Senior Architect
Kitchell CEM
9915 Mira Mesa Blvd. I Suite 300 I San Diego, California 92131 I Phone 858.947.5144 I www.kitchell.com 27 of 32

Page 2 ends

December 16, 2025, Item #5
Attachment
A
FEE

SCHEDULE
Reoslon
02-11
-202S
.
~
.
~
5 ~
f
"ii
~
·~
l!
X.
::E
I
~
I
·~
0 GI
1i
w
0 i
w
i
Poway
Community
Park
New
Restroom
g>"E
g,
ii
I~
o'
~
~
'2'
g,
~.
·c
~
ii:
w
~
::E
~

0. •
E
..
1 "''2
-~;
~
ii'
~
~
0 ~
is:~
~
·I
E

8. goo.
'g>;
·5
-~
]
"g>
-~
~
-~
;ii
-5
§-
w~
w::E
"'
"'
"'w
"'w
"'
"'
<(U,
Total
Hrs
Total
Fee
Task#
Description
S2S0.00
S22S
.OO
S220
.00
S200
.00
5200
.00
$200
.00
S200
.00
S130
.00
S160
.00
S100
.00
1 Preliminary
Design

1.1 General
Project
information
2 4
6 $920

1.2 Develop
Concept
Level
Design
and
Renderings
6 2
2 24
34 SS,120

1.3 Develop
30¾
Early
Schematic
Design
Pack
age
8 4 4
16 4
36 SS,680

1.3 Cost
Estimate
8 8
$1,280

1.5 Meeting
with
Citv
(2)
2 2
4 $660

1.6 Project
Management
1 2
4 7
$1
,580
Sub.Total
1 2
4 18
6 6
0 46
I
4 95
$15,240
1 2
4 18
6 6
0 46
8 4
95 15
,24
0 $250
$450
$880
$3,600
S1
.200
$1,200
so
$5
,980
$1,280
$400
15 ,240
Total
Fe
e
15,240
Ki
tc
hell
CEM
9915
Mira
Mesa
Blvd.

I Suite
300
I San
Diego,
Ca
lifornia
92131
I Phone
858.947.5144
I www.kitchell.com
Page
3 28
of
32 December 16, 2025, Item #5
D
~ 0 0 c:: I-V) w c:: ~ c:: ~ >-1-z :::> ~ ~ 0 u i ~
l!J z 0 i'.= u
""""
:::> c::
z
I-V)
0 z
-
0 t-
u

0. 3:
0 w z
December 16, 2025, Item #5
30 of
32 ~ 0 0 0:: I­(/) w 0:: ~ 0:: ~ >-1-z :::) ~ ~ 0 u ~ 0 a. ""'" z 0 -I-a. 0 N <C z 0 I-u :::) c:: I-Cf) z 0 u $ w z
December 16, 2025, Item #5
__J
~ 0 0 a::: I-V) w a::: ~ a::: '5: >­!:: z :::> ~ ~ 0 u >- M <(
~ ~
l!I z 0 j:: u
""":::>
a:::
z
l-
o
~
- 0 I-
u
a.
$
0 ~
December 16, 2025, Item #5
32 of 32
~
0 0
0::
f-
V)
UJ
0::
::,.::
0::
ct
>­f-
z
::J
~
~
0 u
~ 2 l!I
z
0 j:::
u
~ ::J
0::
z
f-
V)
0 z
-
0 I-u
Q. 3:
0 w z
December 16, 2025, Item #6
DATE:

TO:

FROM:

CONTACT:

SUBJECT:

Summary:

AG EN DA REPORT City of Poway
December 16, 2025
Honorable Mayor and Members of the City Council
Julie Procopio, Director of Development Services<:f
Sara Trunzo, Senior Civil Engineer
(858) 668-4622 or [email protected]

CITY COUNCIL
Approval of Par.eel Map for Tentative Parcel Map 23-0003 (Espola Urban Lot Split); Ben Lund Engineering, Applicant (APN 321-020-68)
The final parcel map for Tentative Parcel Map (TPM) 23-0003 is ready for approval. This map subdivides one parcel totaling 1.05 acres into two single-family residential lots located at 14858 Espola Road. The proposed final Parcel Map implements a state-mandated Senate Bill-9 (SB-9) Urban Lot Split, which means the City has no discretion to deny approval, provided the map meets specific state law criteria.

Recommended Action:

It is recommended the City Council approve the final Parcel Map for TPM 23-0003 and direct its recordation.

Discussion:

Background:

The California Subdivision Map Act outlines a two-step process for subdivision of land. Generally, the first step is a quasi-judicial public hearing to consider the tentative map or the tentative parcel map for four or fewer parcels. This step involves evaluating a project for alignment with existing objective standards, conditions and policies. After a hearing and evaluation of the evidence, a written decision or resolution is adopted based on evidence presented.

The second step is consideration of the final parcel map which is the technical document showing the distance and bearings for each property line of the parcels included in the tentative (parcel) map. This action is ministerial, meaning state law requires approval of any final parcel map conforming to the approved tentative parcel map and conditions of approval. A "ministerial action" refers to an act performed by a government official or employee that strictly follows established rules and procedures, without requiring any personal judgement or discretion; essentially, they are simply carrying out a duty as outlined by law, with no room for individual decision-making. In other words, if . . . .
1 of 9
December 16, 2025, Item #6
the
specific
requirements
are
met,
the
map
must
be
approved.

Recording
the
final
parcel
map
is
the
last
step
in
creating
a
new
parcel.

In
recent
years,
the
State
legislature
has
enacted
several
new
housing
laws
designed
to
expedite
housing
production.

SB-9
amended
Section
66452.6
and
added
Sections
65852.21
and
66411.7
of
the
California
Government
Code.

Effective
January
1,
2022,
local
agencies
are
required
to
ministerially
approve
-at
the
staff
level,
without
a public
hearing
-the
split
of
a single-family
parcel
into
two
parcels
if
minimum
criteria
set
by
the
State
is
met.

Properties
qualifying
for
an
Urban
Lot
Split
and
applicable
requirements
are
further
described
in
the
attached
SB-9
Developments
&
Urban
Lot
Splits:

General
Information
handout
(Attachment
A).

In
accordance
with
the
California
Government
Code
66411.7,
a
provision
of
SB-9,
the
tentative
parcel
map
for
an
SB-9
lot
split
is
required
to
be
approved
by
staff
ministerially
and
without
public
hearing.

Project
Detail:

This
project
meets
the
criteria
for
an
SB-9
Urban
Lot
Split
as
it subdivides
an
existing
residential
parcel
into
two
residential
parcels
and
meets
State
criteria.

In
accordance
with
State
law,
TPM
23-0003
was
approved
ministerially
on
October
30,
2024.

While
the
TPM
was
not
permitted
to
be
considered
for
approval
by
the
City
Council,
the
final
parcel
map
is
coming
to
the
City
Council
for
approval
to
comply
with
Poway
Municipal
Code
(PMC).

Pursuant
to
State
Law,
the
City
Council
must
approve
the
final
parcel
map
if
it
complies
with
State
criteria
and
the
TPM's
conditions.

Staff
has
determined
it
does.

The
existing
residential
parcel
is
located
at
14858
Es
po
la
Road.

The
project
site
is
shown
on
the
vicinity
map
included
as
Attachment
B.

The
existing
parcel
has
a
gross
area
of
45,302
square
feet
and
is
located
within
the
Residential
Single
Family
2 (RS2)
zone.

The
parcel
map
creates two
parcels
with
net
lot
areas
of
approximately
21,189
and
22,484
square
feet
conforming
to
the
minimum
lot
area
of
the
RS2
zone.

The
approved
TPM
meets
the
front
and
street
side
yard
setback
requirements
of
the
PMC.

California
Government
Code
65852.21
permits
rear
and
interior
yard
setbacks
to
be
reduced
to
four
feet
for
qualifying
projects.

Access
is
provided
through
the
existing
20-foot-private
roadway.

The
final
parcel
map,
as
shown
in
Attachment
C,
is
in
substantial
conformance
(per
the
California
Subdivision
Map
Act)
with
the
approved
TPM.

All
conditions
of
approval
prior
to
recordation
of
the
final
parcel
map
have
been
addressed.

Environmental
Review:

This
action
is
not
subject
to
review
under
the
California
Environmental
Quality
Act
(CEQA).

The
adoption
of
the
final
parcel
map
is
identified
as
a
type
of
ministerial
permit
and
is
exempt
from
the
CEQA
State
Guidelines;
therefore,
pursuant
to
the
CEQA
State
Guidelines
Section
15268(b)(3)
no
environmental
review
is
permitted.

Fiscal
Impact:

There
is
no
Fiscal
Impact
as
a
result
of
this
action.

However,
development
of
the
project
will
result
in
additional
property
tax
revenues
in
the
future
to
the
City's
General
Fund.
2 of9
December 16, 2025, Item #6
Public Notification:

The approval of a final Parcel Map is a ministerial action which is routine and required by law. State law and the Poway Municipal Code do not require public notice for ministerial actions.

Attachments:

A. SB-9 Developments and Urban Lot Splits: General Information B. Vicinity Map
C. Parcel Map 23-0003
Reviewed/Approved By:

Assistant City Manager
3 of 9
Reviewed By:

Alan Fenstermacher
City Attorney
Approved By:

Ch~
City Manager
December 16, 2025, Item #6
CITY
OF
POWAY

DEVELOPMENT

SERVICES

DEPARTMENT
SB
9 Developments
&
Urban
Lot
Splits:

General
Information
What
does
Senate
Bill
9 (SB
9)
do?
The
Bill
mandates
jurisdictions
, like
the
City
of
Poway,
to
ministerially
approve
a
housing
development
containing
no
more
than
two
(2)
single-family
dwelling
(SFD)
units
on
a
single
lot
within
a
single
-family
residential
zone,
excluding
certain
areas
. •
It
also
allows
Accessory
Dwelling
Units
(ADUs)
and
Junior
Accessory
Dwelling
Units
(JADUs)
1 on
lots
with
SFDs
.

Additionally,
the
City
must
ministerially
process
an
urban
lot
split
in
accordance
with
SB
9 and
eligible
development
standards. How
do
I apply
and
obtain
permits
for
a
SB
9 development
and
Urban
Lot
Split?
For
housing
development,
hire
a
designer
or
architect
to
prepare
a
building
set
of
plans
in
compliance
with
the
building
permit
application
requirements
and
pay
applicable
plan
check
fees.

Corrections
on
plan
check
reviews
must
be
addressed
before
the
permit
is
approved
and
ready
to
iss1.Je.

Once
the
building
permit
is
approved
, pay
applicable
issuance
and
impact
fees
2,
obtain
your
permit
and
begin
building
. For
an
urban
lot
split
, civil
drawings
prepared
by
an
engineer
are
required
for
the
submittal
and
a
ministerial
Tentative
Parcel
Map
(TPM)
then
a
Final
Map
with
appropriate
fees
are
required
.

For
SB
9 Developments
and
Urban
Lot Splits
Qualifying
Properties
Limitations
Only
properties
that
are
zoned
primarily
for
single-family
residences
Approval
of
a
SB
9 development
cannot
involve
the
qual
ify
. The
following
areas
are
excluded
from
SB
9 developments
demolition
or
alteration
of
structures
if the
property
contains
:
and
Urban
Lot
Splits
:

A.

Affordable
or
rent
controlled
housing;
or
A.

A
Very
High
Fire
Hazard
Severity
Zone;
B.

Housing
occupied
by
a
tenant
within
the
last
three
B.

Wetlands
(ref.

U.S
. Fish
and
Wildlife
Service
Manual);
years

5. C.

A
hazardous
waste
site
;
D.

A
historic
district
or
a
historically designated
site;
Note
: Rental
terms
must
exceed
thirty
days.

Separate
sewer
E.

A
special
flood
hazard
area
or
regulatory
floodway,
unless
and
water
connections
are
required
for
all
SB
9 units.
certain
requirements
are
met
;
F.

Sites
that
contain
habitat
for
protected
species
, including
but
Parking
Requirements
not
limited
to
Coastal
Sage
Scrub,
Chaparral
, and
Riparian
A
minimum
of
one
off-street
parking
space
per
unit
is
Scrub
vegetation
located
within
or
outside
of
lands
identified
required

6. for
conservation
in
the
Habitat
Conservation
Plan
(HCP)
Mitigation
Areas
, sensitive
habitat
areas,
and/or
open
space
easement
or
open
space
zoning
designation
3 .

G
.

Lands
identified
as
moderate
or
high
for
archeological
resources
shall
require
an
archeological
reconnaissance
letter
or
report.

Objective
Design/Development
Standards
Setback
Requirements
The
project
must
comply
with
the
objective
community
design
A.

Meet
the
setbacks
of
the
underlying
zone,
except
themes
and
development
standards
found
in
the
City
's General
Plan
rear
and
interior
yard
setbacks
may
be
reduced
to
and
the
Poway
Municipal
Code
(PMC},
including
landscape
and
four
feet
when
necessary
to
accommodate
one
or
slope
area
requirements

4. The
project's
design
and
development
two
units
up
to
800
square feet
in
size.
must
comply
with
the
City
of
Poway
's
Best
Management
Practices
B.

A
minimum
of
10 ft. distance
between
all
structures
Manual
and
the
PMC
. Existing
properties
already
subject
to
Priority
is
required
.

Development
Project
standards
shall
obtain
prior
approval
from
the
C.

No
setback
shall
be
required
for
a
legally
permitted
city
engineering
staff
for
additional
imperv
ious
area
since
it
may
structure
that
is
replaced
or
converted
to
a SB
9 unit.
require
the
addition
of,
or
alteration
of,
storm
water
facilities
and
strategies.

Reference
City
of
Poway's
"Accessory
Dwelling
Units
and
Junior
Accessory
Dwelling
Units
: General
Information"
handout.

A
credit
will
be
applied
for
previous
impact
fees
paid
on
an
ADU
converted
to
a
main
single-family
residence
as
applicable.

Reference
City
of
Poway's
Subarea
Habitat
Conservation
Plan
(HCP)
4 of
9 ATTACHMENT
A
December 16, 2025, Item #6
Reference
Govt
. Code
Section
65852
.21(b)(1),
Reference
PMC
Section
17 .08
.230(0)
.
4 5
An
affidavit
specifying
rental
status
in
compliance
with
SB
9 shall
be
required
. If
the
unit
was
occupied
by
a
tenant
within
the
last
three
years,
then
no
more
than
25 percent
of
demolition
is
permitted
for
the
exterior
walls
.
6 Reference
Govt.

Code
Section
65852
.21(c)(1). Urban
Lot
Split Requirements
In
addition
to
the
previously
stated
SB
9 development
requirements,
SB
9 allows
subdivision
into
two
lots
(Urban
Lot
Split)
and
shall
meet
the
following
criteria
:

A.

In
conjunction
with
an
Urban
Lot
Split,
no
more
than
two
units
may
be
permitted
per
lot
;
B.

Proposed
lots
shall
be
a
minimum
of
1,200
square
feet
;
C.

Lots
must
be
no
smaller
than
40 percent
of
the
original
lot
area
;
D.

Lots
must
be
located
in,
or
partially
in,
either
an
urbanized
area
or
an
urban
cluster;
E.

Areas
utilized
for
public
or
private
roads,
vehicular
access
easements,
and/or
45 percent
or
greater
natural
sloped
areas
are
excluded
from
lot
area
calculations;
F.

The
ratio
of
lot
depth
to
lot
width
shall
not
exceed
3:1;
G.

Each
lot
shall
have
a
minimum
20-foot
vehicular street
access;
H.

Existing
or
proposed
access
from
a
driveway
or
a
curb
cut
is
required;
I.

Easements
may
be
required
to
convey
public
utilities,
access,
and
other
services;
1 J.

The
property
owner
must
sign
an
affidavit
stating
they
acknowledge
that
the property
's
Covenants,
Conditions,
and
Restrictions
(CC&Rs)
or
Homeowner's
Association
(HOA)
restrictions
are
not
violated
because
of
the
Urban
Lot
Split;
and
K.

The
property
owner
must
sign
a
covenant
stating
the
property's
owner(s):
1)
intends
to
occupy
one
of
the
units
as
their
primary
residence
for
a minimum
of
three
years;
2)
acknowledges
that
the
property
is
no
longer
eligible
for
a
future
Urban
Lot
Split
; 3)
shall
not
subdivide
any
adjacent
parcel
using
an
urban
lot
split;
4)
A
minimum
of
one
off-street
parking
space
per
unit
is
required
per
lot
; and
5)
must
develop
each
lot
per
SB
9 requirements
and
restrictions
.

Off-site
dedications
or
improvements
cannot
be
required
. Reference
Govt
. Code
Section
66411
. 7(b)(3).
5 of
9 SFR SFR
SB
9 Development
Fi!,'1.
lre
1 SFR

ADU SFR
SFR
NOi<:

All
figure-.
arc
no\ to
sc."ll
n
.Ind
do
no1
1ncludo
S89
devcloprn(:nt
stand:
mJs
Th
oso
,ma
gcs
:.uo
for
1!!us
tr,
i:1o
n
purpo
st.--s
only
SFR
SB
9 Developm
ent
with
Urban
Lot
Split
Figu
re2
SFR
SFR
SFR

SFR SFR
N
ote
;\II
figures
arc
not
to
sc;i
lf!
;md
O'o
no
1 include'
S89
dove
lori,n
enl
sl
;md;ircfs
These
Imag
es
are
f0r 1
llustra
l1on
pu
rposP.s
oo!y
December 16, 2025, Item #6
a>
0 -(.0
~
--1
)>
n
J:
s: m
z
--1
OJ
~

VICINITY MAP
TPM23-0003
14854 Espola Rd
APN 321-020-68
Espola Rd
December 16, 2025, Item #6
......
0 -CD
)>
-I
-I
)>
n
J:
s: m
z
-I
n

OWNER'S STATEMENT

WE HEREBY STATE THAT WE ARE THE OWNERS OF, OR ARE

INTERESTED IN THE LAND SUBOMDEO BY THIS MAP, AND THAT WE CONSENT TO THE PREPARATION AND RECOROATION OF THIS MAP.

WE HEREBY RESERVE AN ACCESS EASEMENT AND A UTILITY
EASEMENT OVER PARCEL 1 FOR THE BENEFIT OF" PARCEL 2, ALL AS SHOWN ON THIS MAP.

KEITH 8. MONROE ANO BEVERLY W. MONROE OF THE MONROE
FAMILYfRJST_;~ATED LY 1, 199~
f!Y,_~8 _____ BY _ _ ,l _
KEITH B. MON OE RLY W. ~

TRUSTEE TRUSTEE

BENEFICIARY STATEMENT
KEITH 8. MONROE AND 8EV£RLY W. MONROE, TRUSTEES OF THE
MONROE FAMILY TRUST DATED JULY I , 1996, TRUSTOR(S) ANO WELLS FARGO BANK. N.A., AS THE ORIGINAL LENDER, ON APRIL 18, 2017, ENTERED INTO A CERTAIN DEED OF TRUST INSTRUMENT (THE ~DEED OF TRUSr) RECORDED ON APRIL 19, 2017 AS DOC /I
2017-01761.35, IN SAN DIEGO COUNTY, CA. HEREBY CONSENTS TO THE CITY OF POWAY PARCEL MAP 23-0003 .

WELLS FARGO BANK, N.A.
f!Y, ~~-~~~'~=~~~----­
ir~l,NT"'~~~g/-~E~~~eeeai~ ... 1~ ... ~:.:.":.,e ... (e,s;eeiii»,,,,.-,,, -;;.;;.,----

SIGNATURE OMISSION STATEMENT

THE SIGNATURES OF THE FOLLOWING HOLDERS OF EASEMENTS
HAVE BEEN OMITTED UNDER THE PROVISIONS OF SECTION 66436, SUBSECTION (o), (J), (A), (i) OF THE SUBDIVISION MAP ACT.

THEIR INTEREST IS SUCH THAT IT CANNOT RIPEN INTO A FEE TITLE

ANO SAID SIGNATURES ARE NOT REQUIRED BY THE GOVERNING
SOOY.

JAMES W. WILLIAMS, SEWER LINE EASEMENT TO JAME, ET UX PER FlLE NO. 61698 OFFICIAL RECORDS, RECORDED MAY 3, 1967
\/!VINT SOLAR DEVELOPER. LLC, RIGHT, TITLE OR INTEREST PER FlLE NO. 2013-0707954 OFFICIAL RECORDS, RECORDED DECEMBER

5. 2013.

I 0M11 BILL YEN & ASSOCIATES, INC.

O
Dl}A\.IJ CIVIL ENGINEERING- SURVEYING SITE PLANNlt-:G
,n_ ;~~)I 6~~~~ Ri:~jL1~:; ~~~a~~~~~fl.l·on1 WQ2503
PARCEL MAP NO. ____ _
CITY OF POWAY TENTATIVE PARCEL MAP 23-0003
A PORTION OF THE NORTHERLY 217.02 FEET OF THE SOUTHERLY 415.06 FEET OF THE EAST HALF OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 6, TOWNSHIP 14 SOUTH. RANGE 14 WEST, SAN BERNARDINO BASE AND MERIDIAN, IN THE CITY OF POWAY, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO THE OFFICIAL PLAT THEREOF.

SUBDM~N..cueyrrE FOR THPS SUBOMSION FURNISHED f!'( FlDELITY NATIONAL TITLE. ORDER NUMBER ()d/1/78~2-'i?fr~I ~!{,+ DATED .!(~2.,-,1 2►
TOTAL NUMBER OF PARCELS: 2 TOTAL AREA 1.055 GROSS ACRES

NOTARY ACKNOWLEDGEMENT

A NOTARY PUBLIC OR OTHER OFFICER COMPLETING THIS

CERTIFICATE VERIFIES ONLY THE IDENTITY OF THE INOMOUAL WHO

SIGNED THE DOCUMENT TO WHICH THIS CERTIFICATE IS ATTACHED, ANO NOT THE TRUTHFULNESS, ACCURAcY, OR VALIDITY OF THAT DOCUMENT.
~~~~:Fo~tFO~~~o } ss
ON @9ht.s- BEFORE M,;;i...,...,, .6.# A NOTARY PUBLIC.

PE~"t3AP~f?t7t::
=-~-,v:-1'1!1~~ WHO PROVED

TO ME ON THE BASIS OF SATISFACTORY EVIDENCE TO BE THE

PERSON(S) WHOSE NAME(S) IS/ARE SUBSCRIBED TO THE WITHIN

INSTRUMENT AND ACKNOWLEDGED TO ME THAT HE/SHE/THEY

EXECUTED THE SAME IN HIS/HER/THEIR AUTHORIZED CAPACITY(IES)

ANO BY HIS/HER/THEIR SIGNATURE(S) ON THE INSTRUMENT THE

PERSON(S), OR THE ENTITY UPON BEHALF OF WHICH THE
PERSON(S) ACTED. EXECUTED THE INSTRUMENT.
1 CERTIFY UNDER PENAJ....TY OF PERJURY UNDER THE LAWS OF THE STATE OF CALIF~ THAT THE FOREGOING PARAGRAPH IS TRUE
ANO CORREC . W fNESS ~ND.
~TURE ____ ~~
---~"!1!2.'> ,. ~
NAME (TYPED OR PRINTED), NOTARY PU~C IN AND FOR SAID
COUNTY AND STATE <"l..

PRINCIPAL COUNT'f Of BUS"'ES2 =-~-.!Yo
COMMISSION EXPPRES, /IL.?:] J..(J ~
COMMISSION # Of NOTARY·Q?v.3:r'o;;l-..._
r ~ , ___ ,,,~;:-:r
, :,~l.i'i:?:i%;,,, 1

NOTARY ACKNOWLEDGEMENT
A NOTARY PUBLIC OR OTHER OFFlCER COMPLETING THIS CERTIFlCATE

VERIFIES ONLY THE IDENTITY OF THE INDMOUAL WHO SIGNED THE DOCUMENT TO WHICH THIS CERTIFlCATE IS ATTACHED, ANO NOT THE TRUTHFULNESS, ACCURACY, OR VALIDITY OF THAT DOCUMENT.
~6~~:Fo:1~~~A ) ss
WIS INSTR\!>:lfNT WAS AC NOWlEOGEO Ji!EFORE ME ON
ll'~2-_',,___,.lP_12(DATE) BY ~,',",:~ ..... ;,£'1ll.!".llf.5 (NA ME(S) Of PERSON(S) AS CL_ &!t,rl _____ _
___________________ (T'fPE
OF AUTHORITY, E.G., OFFICER, TRUSTEE. ETC.) OF WELLS FARGO BANK, N.A., A NATIONAL BANKING ASSOCIATION.
~.!CkwW~

SIGNATURE OF NOTARIAL OFFICER
NOTARY PUBLIC I/ ':u/
..,,, COMMISSION EXPPRES, Qlr···:c1~_20
~,we t./1.;rt. [,Afl,;;~e_

CLERK OF THE BOARD OF SUPERVISORS CERTIFICATE

I, ANDREW POTTER, CLERK OF THE BOARD OF SUPERVISORS,

HEREBY CERTIFY THAT THE PROVISIONS OF THE SUBDMSION MAP ACT (OMSION 2 OF Till£ 7 OF TI-iE GOVERNMENT CODE)
REGARDING (A) DEPOSITS FOR TAXES, AND (8) CERTIFICATION OF

THE ABSENCE OF LIENS FOR UNPAID STATE, COUNTY, MUNICIPAL

OR LOCAL TAXES OR SPECLAL ASSESSMENTS COLLECTED AS TAXES EXCEPT THOSE NOT YET PAYABLE, HAVE BEEN COMPL£TED WITH.

ANDREW POTTER
CLERK OF THE BOARD or SUPERVISORS
BY: _________ _

DEPUTY DATE

CPTY CLERK'S CERTIFICATE
I, CARRIE GAU.AGHER, CITY CLERK OF CITY OF POWAY, STATE OF

CALIFORNLA, HEREBY CERTIFY THAT THE CITY COUNCIL OF SAID CITY HAS APPROVED TrtlS MAP ON ______ _
DATE: ________ BY: CARRIE GALLACHER, CMC

CITY CLERK, CITY OF POWAY
SHEET l OF 3 SHEETS

ENGINEER'S STATEMENT
TrtlS MAP WAS PREPARED BY ME OR UNDER MY DIRECTION ANO
IS BA.SEO UPON A flELO SURVEY IN CONFORMANCE WITH TI-iE

REQUIREMENTS OF THE SUBOMSION MAP ACT ANO LOCAL
ORDINANCE AT THE REQUEST OF KEITH B. MONROE ANO
BEVERLY W. MONROE ON FEBRU>RY 5, 2025, AND I CERTIFY

THAT SAID SURVEY IS TRUE AND COMPLETE AS SHOWN, ANO

THE MONUMENTS ARE OF THE CHARACTER INDICATED ANO
OCCUPY THE POSITIONS SHOWN THEREON. I WILL SET A1..1.

OTHER MONUMENTS OF THE CHARACTER ANO AT POSITIONS
INDICATED BY THE LEGEND ON SHEET 2 OF THIS MAP wmilN
30 DAYS AFTER COMPLETION OF THE REQUIRED IM.PROVEMENTS, ANO ALL SUCH MONUMENTS ARE OR WILL BE SUFnCIENT TO
ENABLE THE SURVEY TO BE RETRACED. (SEE L£GEND ON
SHEET 2)
I HEREBY STATE THAT THIS PARCEL MAP SUBSTANTIAU..Y
CONFORMS TO TI-iE APPROVED OR CONOmONALLY APPROVED
TENTATIVE MAP, IF J,.Nf,
f!'( _ _d:fL_UJ.-/fl ~v-z_,;
WILLIAM C. YEN, ~CE 33730

CPTY ENGINEER'S STATEMENT
1, TRACY BEACH, CITY ENGINEER OF THE CITY Of POWAY, STATE

OF CALIFORNIA, STATE THAT I HAVE EXAMINED THIS MAP,
CONSISTING OF 3 SHEETS, AND THAT THE SUBOMS ION AS

SHOWN IS SUBSTANTIALLY THE SAME AS IT APPEARS ON THE
TENTATIVE MAP, AND AflY APPROVED ALTERATIONS TI-iEREOF.

THAT ALL PROVISIONS OF TrtE SUBOMSION MAP ACT ANO OF
THE LOCAL ORDINANCES APPUCABL£ AT THE TIME OF APPROVAL.

OF THE TENTATIVE MAP, HAVE BEEN COMPLIED WITH.
--~:7_0,,_j__..._ - 11/,0/2,5
TRACY s5;eH, PE 7.3756 DATE

CITY ENGINEER

CITY SURVEYOR'S TECHNICAL STATEMENT
I HEREBY STATE I HAVE EXAMINED THIS MAP fOR THE CITY

ENGINEER AND I AM SATISFIED THAT THIS MAP IS TECHNICALLY :~_o .I __ () _,o/3'> /MV,
PAUL £.~-re~ ~
RECORDER•s CERTIFICATE
FILE NO. _____ _
I, JORDAN Z. MARKS, RECORDER OF THE COUNTY OF SAN

DIEGO, STATE OF CALIFORNIA, HEREBY CERTIFY THAT I HAVE
ACCEPTED FOR RECOROATION TI-ilS MAP FllEO AT THE REQUEST OF WILLIAM C. YEN THIS ___ DAY OF _____ _
20 __ . AT ___ O'CLOCK, __ .M.
!'EE J __
JORDAN Z. MARKS

COUNTY RECORDER

BY -------------DEPUTY COUNTY RECORDER
~~i:·,. '~'"'"'•"'-'"·''"'"' I ~,.,_...,~ ,: .,..,..,...,c, . : ,· 11•~f1'«3 )·:. ·-..: GRADING PLAN G_NA ______ _
~~,~~ TPM 23-0003 CALIF. COORD. INDEX 294-1761
December 16, 2025, Item #6
CX)
0 -U)
PARCEL MAP NO. CITY OF POWAY TENTATIVE PARCEL MAP 23-0003 SHEET 2 OF 3 SHEETS ,,,
0 ~
+ "'w C/L RS 1673 : ALSO KNOWN r AS ESPOLA ROAD (PUBLIC) SCALE: 1 ~ ... 1 oo·

PROCEDURE OF SURVEY
z
I
I
/
/T0
g~
Ill l"')l")I"') 0
a.I ---
N
,.,- ~
w ~ N ::,
Q. g
~ ~ ~ ;:26 ~,," 41 0 u,N ONCI ,.
~! -~ ~~c m ~ ~~ ~tii &!~~ ~::-~ ~~ ~~~ ~cl~
~! EAST LINE
~~1 /-Wt/2 SEC 6
I
I
I
[
::; :'.:'.:'.
a:~ -::::: ~NZ
,- NOO'J1'58"W 2164.59' {N00"32'46"Wj ((NOO'J1' 1.3"W)) {NOO"J2'0J'\Y 2164.63') --, .,: I ' I NN.,, /~00"32'40"W 4017.97' {NOO"l2'J3"'W 4017.58' ROS 3945) (NOO"J2'19"W 4017. 79'. MAP 7692) - ---~ ~~ ~ l'(NOO'OJ'29'W 4018.00' ROS 11839) (NOO'J2'4t'W 40 18.02') {NOO"J2'JJ"W -4018.00 MAP 12613) _ ____ -:1~ /
/--
0)
?;
v,w
~~
"' O"
'-'' ..,;;; zz
-7-- -
/
,Q -/-.---~- - I a24.or (624.11 Ro·s 11639) - - L4 - - - ~ ~!~ . t ,.

SOUTH 1/•SEC CORNER Q) ".) "'::'•0
?,,,,, 1.,;:;- LS ~ f SECTION 6 c,~o ...

N89.28'02~E 20.48' _.,,, '@ .\..30 _59' (30. ◄ 5') /o
c ' f,j ci Oci
i~;r~rn:~ ~g::g:l I {J0 .54., l a:i ~;g \ = ('ti;;
(Ns9·2a•s3"E 20.ss· Ros 11aJ9) / I~ i..
offi ~ 8 1 ~tn~ C7I
~i~2~~~i'iRMAP7570 ~ 12> I !~~ ~~i I i,oo·scALE JO :
1 1 ~~~f;
ci:J . 0 .ow:!! EXAGGERATED Ww~ 1
&;,--'aoa:>
~ :::, , ,~ .. L ;,;~u rFORClARllY ;';~i!i ~ I ~m
"! __J ~ r - - -~ ... 7 v,w:l ::il - :-7 u P"I
Ul O OU -~ ; ; -- I I /NOO'J 1'56"W 21:.~o~ I -- ~~e ~ C/L TWIN tf' I I . - PEAKS RD- I ~t I ~ I i~~ {PUBLIC) '"1 ~
_.. I - "'"'~ :g~ JQ.QQ'
N
(!)t/1 r,..
~z ACCESS j PARCEL 2 ~ I N ~~~O? :;: EASEMENT
_8-1 -- _. ~io-:1~
I
~ ~ i--t--,......;==--~kl ~ I ~ ~~~~ , U::;1;:::;::=::::::::i:::::::::~~-lf-22!!!:.<~--~ ~,,: ESPOlA RD ~
~w 1J 217,02' z (J)-~~
...,:g~ 1 ~ o "'"~-
! __ L _ ~·3~2~2~1~ _ J ~ ~~~~ ~
;i ~ :- LINE DATA:
1:10
~ ~ 8 ~
~
SEE DETAIL 'A' • :8!o'm' -------
~ I l- _J ON SHEET 3 q3-!:;J Ll : 660.0•f (660 .01') 8 - - ~:--;_;;:: (659 .88' ROS 3945) « -- -- ;i :'.'2!~.,, l659 .94'1 ~ 1 ff:~~~ (659.99 : ROS 11839) N14'27'0 ◄ -E O l7' I g=:!-a::, (659 .8~ MAP 1~613) I I SCALE EXAGGERATED-,. I .,,,,,.,, L2, 660.0l ' (660.01) FOR CLARITY @ / \ // i.8~ 5 i~;::~~'I ROS 3945) ..._ Z'!J.:l:;,, (659 .99' ROS 11839) a;,ig-;:; (659.93' MAP 12613} ~:,..111 LJ: 1854.06' {1854.08') - :g (1854.00' ROS 11839) io l4: 1339.84' (1339.93') I j I WEST LINE OF I El/2 NEl/4 SW 1/4,
' _r L6 ::::,,I SEC 6 I ', I__, _____ _
@) ,_ - (NOO'J~~~-~~i1: 1t~· )~~f)"?~~9
o1s~~~2
~1

24.21')
7892 MAP ' \
I
POWA'I' 1 RO CARDEN RO 100· o so· 100· 200' 400'
i
~ (1339.63' ROS 11839)
SOUTH LINE OF- ✓ - ~~~;::~g: ~ ~::;~ ~~~/; sw t/4 l 3 I LS: Noo-31•se· w 163.69' VICINITY MAP

NOT TO SCALE
I D]\ ♦a BILL YEN & ASSOCIATES, INC.
--- - i......, ---
)
1 INCH = 100 FEET
I
I L6: N00'39'20"w 162.95° I L7, 93.15 ' (93.36') (5) / LB: N00-31°5 8"W 198.11° 28 _04 , (z8_05 ,) 'f" ~ I // {NOCTJ2'03'"W 198.15°) (28.02' MAP 7892)--,~ ~ )/ N8S-38'47"w 29.98' (NB8"45'03"W 29.97'), ', -© SW CORNER NE1/4 SW1/4 SEC 6 (N88"45'55"W 30.02' MAP 7892) -(30.04' MAP 126 IJ) \e -•-.@ GRADING PLAN G NA LEGEND
((
•
0 D
INDICATES FOUND MONUMENT AS NOTED 1N MONUMENTATION SCHEDULE INDICATES RECORD DATA PER ROS MAP NO. 21481 UNLESS STATED OTHERWISE INDIC-'TES RECORD DATA PER MAP NO. 11852
INDICATES RECORD DATA PER MAP NO. 7570
}) INDICATES RECORD DATA PER MAP NO. 9766
INDICATES SET LEAD ANO DISK STAMPED ·RcE 33730-
INOICATES SET J/4'" IRON PIPE WITH PLASTIC TAG STAMPED .. RCE 33730·

MONUMENT SCHEDULE
G)
0 0
©
®
®
(j)
®
®
@J
@
@
FD 2" IP W DISK STAMPED LS 4324 PER ROS 21 £84, MAP 11852, ROS 11839, & MAP 12613 F'O Y WELL MONUMENT W J'" IP &: NAIL. NO DISK. ACCEPT AS MOMUMENT SHOWN ON MAP 9766 FD BOAT SPIKE & WASHER STAMPED LS 3997. ACCEPTED AS PERPETUATION 1-14• CAPPED PIPE W LS 1344 PER ROS 3945. ROS 11839 . ROS 21481. MAP 7892 & MAP 12613 FD 2'" IP & DISK RCE 19375 PER MAP 7892 , MAP 12613, & ROS 21481. ACCEPTED AS SW CORNER Of NE1/2 OF SWl/4 OF SECTION 6 FO 2· IP • DISK RCE 19375 PER MAP 7892 & ROS 21481
FD 2· IP W DISK RCE 19375 PER MAP 7892. MAP 12613 & ROS 21481. NOT HELO FD 3/◄ "JP W OJSK LS 6788 PER CR 50831. ACCEPTED AS MONUMENT FD 3/4" IP W DISK RCE 18486 IN PLACE or RfBAR & CAP LS 7810 . PER ROS 21481, & CR 50831. NOT HELO FD MAGNETIC SPIKE W LS 6768 PER CR 50831. ACCEPTED AS MONUMENT NOT HO..D FD 2" IP W DISK LS3663 PER MAP 7570 & ROS 21481
FD J/ ◄- IP W OtSK LS 3663 PER MAP 7570 & ROS 21481
STREET MONUMENT PER RS 1673 & MAP 7570 . SEARCH, NOTHING FOUND.

BASIS OF BEARING
THE SOUTH LINE or THE THE NORTHEAST QUARTER OF Tl-IE SOUTHWESTER QUARTER, SECTION 6, TOWNSHIP 14 SOUTH. RANGE 1 WEST. SAN BERNARDINO MERIDIAN, IN THE CITY OF POWAY. COUNTY OF SAN DIEGO, STATE OF CAUFORNIA PER RECORD OF SURVEY WP NO. 12285 I.E.: N 88°45'03'" W
ACCESS NOTE:

ACCESS FROM ESPOLA ROAD, WHICH IS A PUBLIC ROAD IS THROUGH THE FOLLOWING EASEMENTS ANO RIGHT OF WAY PRNATE ROAD PURPOSES: THE NORTHERLY J0.00 FftT OF THE SOUTHERLY 660.06 FEET, ANO THE EASTERLY 20.00 FEET OF THE WESTERLY 252.00 FEET OF THE NORTHWESTERLY 245 .00 FEET OF THE SOUTHERLY 660 .06 FEET OF THE EAST HALF OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 6, TOWNSHIP 14 SOUTH. RANGE 1 WEST. SAN BERNARDINO BASE ANO MERIDIAN.

MEASUREMENT NOTE: ALL MEASUREMENTS PRESENTED ON THIS MAP ARE BASED ON FIELD SURVEY EXCEPT THOSE NOTED PER LEGEND ABOVE.

CITY OF
O
D.l} Cl'!IL t:.NGINffKING · SUK VE\' INCi SITE l'I .AKNl!l:Ci ]{ ;:~:1
1 ~~!~~~ R~~~,~-t~~~~~~;15~::~~;~~::.com WO2503
CALIF. COORD. INDEX 294-1761 POWAY TPM 23-0003
December 16, 2025, Item #6
<.D
0 -<.D
PARCEL MAP NO. _____ _
CITY OF POWAY TENTATIVE PARCEL MAP 23-0003
SHEET 3 OF 3 SHEETS
10012.20·1 --- ------r--
~ i)
--- ---- ---- ---- ----
·7
i/
N88"45'03"W 210.82'
I I
SEE DETAIL 'B'@RIGHT_ ...... 11L -
r,.I' I
''J

ACCESS EASEMENT FOR
-!

THE BENEFIT OF
PARCEL 2 RESERVED UTILITY EASEMENT FOR
HEREON, 20.00' THE BENEFIT OF
PARCEL 2 RESERVED
l:l .•
~
N
1'l
PARCEL1 ,~.
,,;
I
23,474 SQ.FT. GROSS ..,
21,189 SQ.FT. NET
I
gi
·+
I I ~ ~ N
I
I~ ;'
N 20.02 ' 44.16' N88"JJ'46"'W 147.64' IN
N
:,: N86'37'26"E 64.1B'
I ;' --
g
z
PARCEL 2
jg 22,484 SO.FT. GROSS & NET
8 _______ _!
I NBB"'45'0.3''W 211.54'
I
I
20' D 10' 20' 40' BO'
I. - - '--' I 'I ••w
1 INCH = 20 FEET
I D)\ ♦JI BILL YEN & ASSOCIATES, INC.

O
D},JA\_IJ CIVIL ENGINEERING · SURVEYING · SITE PL,\NNING .n\. :i~;)l6~-~~~ R~M~it~~:;~~:~~:~~~il.cum WO2503

DETAIL 'A'
SCALE: 1 ~ = 20'
I
I
//
//

1.00' SCALE J

EXAGGERATED

FOR CLARITY
-
1 .00' SCALE_.,1

EXAGGERATED
FOR CtARITY
~
' ~ I:...

I~
z
i2
~
' I I
1/
\ --
--
--
'
217. 79' MEASURED

PERPENDICULAR TO
1/-4 SECTION LINE -f- N88"45'0J"W 210.B~
T _...r i
i! N
w
5w
i~~
~~~
2;..,­
~~~
~~~ ~w a.+
~~
SEC 6

1.00·. NOT_,__... ~N00-32' ◄ 0"w
TO SCALE I 1.02'
w z~ ::;
O .u
~V)~
=>o,.
~:VJ
25,
1~;
:;3.
ffi~ a.
\;
'----T---f[
N88"~5'03"'W J '>- 5.00'. NOT

1.19 / TO SCALE
0 DETAIL 'B'

NO TO SCALE
.;
N
;' 200.00·
~ MEASURED
-..... PERPENDICULAR
':'"I TO WEST
~ LINE OF RS 1672
t

EXISTING EASEMENTS
00#1 SEWER LINE EASEMENT TO JAMES W. WllUAMS, ET UX PER FlLE NO. 61698 C.R. RECORDED MAY 3. 1967
00f2 RIGHT OF WAY EASEMENT FOR ROAD PURPOSED TO KEITH 8.

MONROE &: BEVERLY w. MONROE. TRUSTEES or THE MONROE FAMILY TRUST DATED JULY 1, 1996 PER FllE NUliABER 2007-0340744 C.R.

RECORDED MAY 18, 2007
D0#3 SEWER &: WATER EASEMENT TO KEITH B. MONROE &: BEVERLY W.

MONROE, TRUSTEE OF THE MONROE FAMILY TRUST DATED JULY 1, 1996
00#4 RJCHT. TITLE OR INTEREST or VMNT SOLAR DEi/ELOPER, UC PER FIL£ NO. 2013-0707954 O.R. RECORDED DECEMBER 5, 2013 . CANNOT BE PLOTTED.

GRADING PLAN G....ccNA-'---------
~2'1f~TPM CAUF. COORD. INDEX 294-1761 ----23--0003
December 16, 2025, Item #7
AG EN DA REPORT City of Poway
DATE:

TO:

FROM:

CONTACT:

December 16, 2025
Honorable Mayor and Members of the City Council
Julie Procopio, Director of Development Services q
Sara Trunzo, Senior Civil Engineer
(858) 668-4622 or [email protected]

CITY COUNCIL
SUBJECT: Acceptance of Public Improvements for the Sage at Old Coach Subdivision, Improvement Plan 22-0001
Summary:-
Improvement Plan (IMP) 22-0001 for the Sage at Old Coach Subdivision project included trail installation, sewer and water main extensions, and a fire hydrant. The improvements are complete and ready for acceptance.

Recommended Action:

It is recommended the City Council:
1) Accept the improvements shown on the plans for IMP 22-0001 as complete; 2) Release the Performance Bond in the amount of $270,200; 3) Release the Payment Bond in the amount of $135,100; and 4) Retain the Warranty Bond in the amount of $27,020 for a period of one (1) year.

Discussion:

City Council approved the Tentative Tract Map (TTM) 21-004 for the Sage at Old Coach residential subdivision at the northwest corner of the intersection of Old Coach Road and Espola Road on December 7, 2021. As a condition of approval for the development, the project was required to install public improvements including sewer, storm drain, street, trail and landscaping improvements.

Additional improvements on the plans included a fire hydrant and improvements to the existing bus stop on Espola Road including a concrete pad, benchand signage. The improvements have been completed in accordance with the project plans, the Standard Agreement for Construction of Public Improvements (Attachment A), and have been accepted by the Development Services Department.

Poway Municipal Code 16.20.110 requires that any and all securities for work estimated to cost over $100,000, or securities required to be posted in conjunction with any subdivision or parcel map, be released by City Council. Since these improvements were in conjunction with a subdivision, and were valued over $100,000, City Council approval is required for the release of the securities associated with this project.
1 of 15
December 16, 2025, Item #7
Environmental Review:

A Final Environmental Impact Report (FEIR) was prepared pursuant to the California Environmental Quality Act (CEQA) in conjunction with the Old Coach Golf Estate Specific Plan (OCGESP), and was certified on May 15, 1990. An Addendum for the proposed project prepared in accordance with Section 15164 of the CEQA Guidelines was adopted by the City Council on December 7, 2021.

Therefore, no further environmental review is required for the acceptance of the improvements.

Fiscal Impact:

There is no Fiscal Impact as a result of the requested action.

Public Notification:

None.

Attachments:

A. Standard Agreement
Reviewed/Approved By:

Assistant City Manager
2 of 15
Reviewed By:

Alan Fenstermacher
City Attorney
Chris Hazeltine
City Manager
December 16, 2025, Item #7
Poway,
California
Agreement
Date

STANDARD

AGREEMENT
FOR

CONSTRUCTION
OF
PUBLIC

IMPROVEMENTS
(Sage
at
Old
Coach
-
IMP22-001)
The
CITY
OF
POWAY
("CITY")
and
New
Pointe
Investment
52 LLC.
("OWNER")
agree
as
follows:

A.

OWNER
is
required
to
construct
the
following
public
improvements
("work")
for
the
above
referenced
project:
a.

Installation
of
public
water
main,
fire
hydrant,
and
associated
appurtenances
b.

Installation
of
a
public
sewer
main
and
manholes
c.

New
curb,
gutter,
sidewalk,
and
pavement
for
a
portion
of
Old
Coach
Road
d.

Installation
of
7 monuments
B.

CITY
approved
plans
and
specifications
for
the
construction
of
the
work,
which
are
incorporated
herein
by
reference,
and
identified
as
Public
Improvement
Plans
IMP22-
001.

C.

The
following
are
attached
hereto
and
made
a
part
hereof:

Schedule
A
Schedule
B
Public
Improvements
Monument
Setting

1. IMPROVEMENTS:

TIME
TO
PERFORM:

For
valuable
consideration
OWNER
agrees
to
do,
or
cause
to
be
done,
at
OWNER's
expense
and
without
any
cost
or
liability
to
the
CITY,
all
of
the
work
described
herein
by
the
date
specified
on
Schedule
A.

OWNER
warrants
that
all
of
the
materials
supplied
and
work
to
be
done
will
be
of
good
quality
and
workmanship.

Said
work
shall
be
in
strict
conformity
with
the
plans
and
specifications
of
the
work,
the
standard
specifications
and
drawings
for
public
improvements
adopted
by
CITY,
and
this
agreement.

OWNER
shall
furnish
all
transportation,
equipment,
labor,
services,
permits,
utilities,
and
all
other
items
necessary
to
complete
the
work.

OWNER
shall
pay
all
claims,
demands,
and
liability
arising
out
of
or
resulting
from
or
in
connection
with
the
performance
of
the
work.

OWNER
shall
furnish
accurate
"as
constructed"
plans.

In
addition,
Owner
shall,
prior
to
acceptance
of
the
work
by
City
Council,
set
all
final
monuments
and
stakes
.

OWNER's
obligations
herein
are
not
limited
by
any
cost
estimates,
nor
will
any
estimate
be
a
measure
of
damages.
3 of
15 CITY,
in
its
sole
discretion
and
without
liability
to
CITY
, City
Council
Members,
CITY's
Engineer
and
their
consultants,
and
each
of
their
officials,
directors,
officers
, employees
and
agents,
may
require
changes,
alterations,
or
additions
to
the
plans
and
specifications
which
do
not
exceed
ten
percent
(10%)
of
the
original
CITY
approved
cost
estimate
of
the
work.

CITY,
in
its
sole
discretion
and
without
liability
to
CITY,
City
Council
Members,
CITY's
Engineer
and
their
consultants,
and
each
of
their
officials,
directors,
officers,
employees
and
agents,
may
require
changes,
alterations,
or
additions
in
addition
to
said
ten
percent
{10%)
limitation
if
required
to
correct
errors
or
omissions
in
the
approved
plans
and
specifications,
and
for
unforeseen
conditions
such
as,
but
not
limited
to,
rock
excavation,
unstable
soil
conditions,
or
high
water
tables
requiring
de-watering.

Agreement
-1 of
8 ATTACHMENT
A
December 16, 2025, Item #7

2. INSURANCE: OWNER shall not commence or continue to perform any work unless OWNER has in full force and effect all required insurance with companies satisfactory to CITY. To be acceptable, insurers must be authorized to do business and have an agent for service of process in California, and have an "A" policyholder's rating and a financial rating of at least Class XI in accordance with the current Best's Ratings. OWNER shall not permit any contractor or subcontractor to perform any work unless the worker's compensation insurance requirements have been complied with by each of them. All insurance policies shall be maintained until the work is accepted by the CITY and provide for coverage of all causes of action or disputes arising out of acts in performance of the construction of the public improvement herein whether said causes or disputes are filed or brought to the attention of the CITY before or after the CITY acceptance of work.
4 of 15
With approval of the CITY's Attorney, insurance coverage required by this section may be satisfied by insurance held in name of prime contractor of OWNER, provided that prime contractor coverage is sufficiently broad to include all losses on job site.

As evidence of coverage, OWNER shall provide certificates of insurance and endorsement of CITY forms. Each certificate shall bear an endorsement waiving right of cancellation or change in coverage without forty-five (45) days notice in writing delivered to CITY.

Before issuance of construction permit, OWNER shall provide certificate(s) of insurance, satisfactory to CITY, certifying that OWNER, and each of OWNER'S contractors, has for the agreement period, full worker's compensation insurance coverage for all persons who are or may be employed in carrying out the work.

Before issuance of construction permit, OWNER shall provide to CITY, certificates of insurance and endorsements that OWNER has liability insurance coverage naming CITY as additional insured for both bodily injury and property damage in a single limit of not less than that specified on Schedule A for any one occurrence.

Liability insurance coverage shall include each of the following types of insurance as required by the CITY to carry out this agreement.

A.

1. 2.

3. 4.

5. 6.

7. 8.

9. General Liability
Comprehensive Form
Premises-Operations
Explosion and Collapse Hazard
Underground Hazard
Products/Completed Operations
Hazard
Contractual Insurance
Broad Form Property Damage
Including Completed Operations
Independent Contractors
Personal Injury
B.

1. 2.

3. 4.

Automobile Liability
Comprehensive Form,
Including Loading and Unloading
Owned
Hired
Non-Owned
Contractual insurance shall be sufficiently broad to indemnify CITY as set forth in Paragraph 4.

Any liability insurance naming the CITY insured, shall include as additional insured City Council Members, CITY's Engineer and their consultants, officials, directors, officers, agents, and employees. Insurance afforded them shall be primary insurance and the amount provided shall not be reduced or prorated by reason of any other insurance they might have.

Agreement -2 of 8
December 16, 2025, Item #7
Nothing contained in these insurance requirements shall limit the liability of OWNER or OWNER's insurance companies. Review and acceptance of insurance certificates shall not constitute any representation by CITY or its representative that any required insurance has been issued.

3. OWNER'S LIABILITY: OWNER shall, at OWNER's sole cost and expense, be solely and completely responsible for all matters affecting the design, prosecution, progress and completion of the work, (both on and off the job site). OWNER shall be responsible for observing all laws. OWNER shall provide for public convenience and safety, and safety of workers, including OWNER's workers and those of OWNER's contractors, subcontractors and suppliers, and others contributing to the work. OWNER shall protect CITY property and property rights of others, including the location, maintenance and replacement of utilities, whether shown on the plans or not. OWNER shall give prior notification to utility owners. OWNER shall protect against and prevent drainage from storm runoff. OWNER shall not interfere with the lawful use by others of easements and rights-of-way. Nothing in this agreement, the specification, or other contract documents, or CITY's approval of the plans and specifications or inspection of the work, shall relieve the OWNER or contractor of full responsibility for all aspects of the work. CITY, City Council Members, CITY's Engineer, and their consultants, and each of their officials, directors, officers, employees, and agents shall have liability for any aspect of the work.

4. OWNER'S INDEMNIFICATION: For Claims (as defined herein) arising out of the work contemplated to be performed by OWNER under this agreement, CITY and its elected and appointed boards, officials, officers, agents, employees and volunteers (individually and collectively, "lndemnitees") shall have no liability to OWNER or any other person for, and OWNER shall indemnify, protect and hold harmless lndemnitees from and against, any and all liabilities, claims, actions, causes of action, proceedings, suits, damages, judgments, liens, levies, costs and expenses, including reasonable attorneys' fees and disbursements (collectively "Claims"), which lndemnitees may suffer or incur or to which lndemnitees may become subject by reason of or arising out of any injury to or death of any person(s), damage to property, loss of use of property, economic loss or otherwise occurring as a result of OWNER's negligent performance under this agreement, or by the negligent or willful acts or omissions of OWNER, its agents, officers, directors, contractors, or employees. 5 of 15
The foregoing obligations of OWNER shall not apply to the extent that the Claims arise from the negligence or willful misconduct of CITY or its elected and appointed boards, officials, officers, agents, employees and volunteers.

In any and all Claims against CITY by any employees of the OWNER, anyone directly or indirectly employed by OWNER, or anyone for whose acts OWNER may be liable, the indemnification obligation under this Section 4 shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the OWNER under worker's compensation acts, disability benefit acts or other employee benefit acts.

OWNER shall also indemnify and hold harmless CITY, City Council Members, CITY's Engineer, and their consultants, and each of their officials, directors, officers, employees and agents from and against all losses, expenses, damages (including damages to the work itself), attorneys fees, and other costs, including costs of defense, which any of them may incur both during and after completion with respect to any latent deficiency in the design, specifications, surveying, planning, supervision, observation of or construction of the improvements referred to herein or any injury to a person or property, real or personal, as a result of any such latent deficiency.

CITY's costs shall include the cost of inspecting and restoring other portions of the work which CITY reasonably suspects may also be defective by reason of known defects in the work or other work performed by OWNER or OWNER's contractors, subcontractors, or suppliers or Agreement -3 of 8
December 16, 2025, Item #7
designed
by
their
representatives.

Provisions
of
this
Paragraph
4 shall
remain
in
effect
ten
(10)
years
following
acceptance
of
improvements
by
the
CITY.

Nothing
contained
herein
shall
limit
CITY's
remedies
pursuant
to
Code
of
Civil
Procedure,
Section
337.15.

5. SECURITY:

With
the
execution
of
this
agreement,
OWNER
shall
furnish
and
deliver
to
CITY,
at
no
expense
to
CITY,
a
payment
bond
and
a
performance
bond.

Each
shall
be
in
the
amount
of
the
CITY-approved
estimate
specified
on
Schedule
A.

Bonds
shall
be
furnished
by
surety
companies
satisfactory
to
the
CITY
on
the
forms
provided
by
CITY.

No
alterations
or
substitution
of
said
forms
will
be
allowed.

To
be
acceptable,
surety
companies
must
be
authorized
to
do
business
and
have
an
agent
for
service
of
process
in
California,
be
on
the
accredited
list
of
the
United
States
Treasury
Department,
and/or
have
an
"A"
policy
holders
rating
and
a
financial
rating
of
Class
XI
or
better
in
accordance
with
the
current
"Best's
Rating."
The
bonds
will
be
limited
to
amounts
acceptable
to
the
Treasury
Department.

None
of
the
following
shall
in
anywise
affect
the
obligations
of
any
surety.

Each
surety
waives
notice
thereof:
(a)
any change,
extension
of
time,
alteration,
or
additions
to
the
terms
of
the
agreement,
or
the
work
to
be
performed,
or
the
plans
and
specifications
therefore;
(b)
any
matters
unknown
to
surety
which
might
affect
surety's
risk
except
that
CITY
will
advise
surety
upon
request
of
the
following:
(1)
any
written
claims
it
receives
from
unpaid
subcontractors
or
suppliers,
and
(2)
any
written
orders
received
from
other
public
authorities
charging
violations
of
laws,
ordinances
or
regulations,
and
(3)
failure
of
OWNER
to
comply
with
any
written
notice
to
correct
defective
work.

The
obligations
of
OWNER
shall
not
be
limited
by
the
amount
of
such
bonds.

6. TYPES/AMOUNT
OF
SECURITY:

In
lieu
of
payment
and
performance
bonds,
OWNER
may
furnish
CITY
either
cash,
a
Letter
of
Credit,
or
an
Agreement
of
Deposit
as
security
for
performance.

Said
security
shall
be
in
amount
no
less
than
one
hundred
percent
(100%)
of
the
cost
estimate
and,
in
addition,
for
payment
of
those
furnishing
materials,
labor
or equipment
in
amount
not
less
than
fifty
percent
(50%)
of
the
cost
estimate.

Said
security
agreements
shall
be
on
forms
furnished
by
CITY.

No
alterations
or
substitution
of
said
forms
will
be
allowed.

The
obligations
of
OWNER
shall
not
be
limited
by
the
amount
of
the
security
required.

7. COSTS
AND
DEPOSITS:

OWNER
agrees
to
pay
CITY,
on
demand,
the
full
amount
of
all
of
CITY's
costs
incurred
in
connection
with
the
work
and
this
agreement.

These
costs
include,
but
are
not
limited
to,
plan
checking,
inspection, materials
furnished,
attorneys
fees
incurred
in
connection
with
preparing
and
negotiating
this
agreement,
and
all
other
expenses,
including
engineers
and
attorneys
fees
of
CITY,
directly
attributable
to
the
work
and
this
agreement.

These
costs
shall
include
a
reasonable
amount
for
CITY's
overhead
in
connection
therewith,
plus
any
applicable
fees
of
CITY.

CITY's
costs
shall
include
the
cost
of
inspecting
and
restoring
other
portions
of
the
work
both
during
and
after
acceptance,
which
CITY
reasonably
suspects
may
also
be
defective
by
reason
of
known
defects
in
the
work
or
other
work
performed
by
OWNER
or
OWNER's
contractors,
subcontractors,
or
suppliers
or
designed
by
their
representatives.

OWNER
shall
deposit
with
CITY
concurrently
with
the
execution
of
this
agreement,
such
sums
as
the
CITY
establishes
as
deposits
set
forth
on
Schedule
A.

Should
the
actual
expenses
be
in
excess
of
the
deposit set
forth
on
Schedule
A,
OWNER
shall
pay
the
amount
of
such
excess
on
demand.

Should
the
actual
expenses
be
less
than
the
estimated
deposit
on
Schedule
A,
the
difference,
without
interest,
shall
be
refunded
to
OWNER
within
ninety
(90)
days
of
acceptance
of
work
by
CITY;
provided,
however,
the
CITY
shall
have
the
right
first
to
apply
any
excess
monies
to
any
other
obligation
which
OWNER
might
have
to
CITY
.

Said
deposit
is
not
a
trust
fund
and
said
deposit
may
be
co-mingled
with
other
similar
deposits.

8. PARTIAL
UTILIZATION:

Until
all
work
has
been
completed
and
accepted
by
CITY
and
all
other
Agreement
-4 of
8 6
of
15 December 16, 2025, Item #7
public authorities having jurisdiction, OWNER shall be responsible for the care, maintenance of, and any damage to the work.

When the work or any portion of it is sufficiently complete to be utilized or placed into service, CITY shall have the right upon written notification to OWNER to utilize such portions of the work and to place the operable portions into service. With this notice and commencement of utilization or operation by the CITY, OWNER shall be relieved of the duty of maintaining the portions so utilized or placed into operation. However, such use and operation shall not relieve OWN ER of the full responsibility for completing the work in its entirety, for making good defective work and materials, for protecting the work from damage, and for being responsible for damage and for the work as set forth herein. Nor shall such action by CITY be deemed completion and acceptance. Further, such action shall not relieve OWNER, or OWNER's sureties and insurers, of the provisions hereof relating to indemnity and guarantees.

9. ACCEPTANCE OF PROJECT/WARRANTY: Acceptance of the work shall only be by action of the City Council. Neither the acceptance nor any prior inspections or failure to inspect shall constitute a waiver by CITY of any defects in the work. From and after acceptance, the work shall be owned and operated by CITY. As a condition to acceptance, OWNER and OWNER's contractor shall each certify to CITY in writing that all of the work has been performed in strict conformity with the agreement and that all costs have been paid or supply to CITY security, satisfactory to CITY, guaranteeing such performance.
7 of 15
In addition to OWNER's other obligations under the agreement, OWNER warrants all work and materials to be of good quality and fit for the purpose and intended use. OWNER shall repair, replace, and restore any and all such work which may prove defective in workmanship and/or materials, without expense whatsoever to CITY; ordinary wear and tear and unusual abuse or neglect excepted. OWNER shall also repair, replace, and restore any other work which is displaced in correcting defective work, as well as other portions of the work which CITY by reason of such defects reasonably suspects may also be defective. OWNER shall provide a warranty bond or other security satisfactory to CITY for a period of one (1) year. Said bond or other security shall be in an amount satisfactory to CITY, but in no case less than ten (10) percent of project cost. Said bond or other security shall in no way limit the time within which CITY may bring action for breach of this warranty (CCP 337) or action for latent defects (CCP 337.15) nor the amount of such claim or judgment.

In the event of a failure to commence with the compliance of above-mentioned conditions within seven (7) calendar days after being notified in writing or failure to diligently pursue such compliance to completion, CITY is hereby authorized to proceed to have the defects repaired and made good at the expense of OWNER who hereby agrees to pay the cost and charges therefor immediately on demand.

If, in the opinion of CITY, nonconforming work creates a dangerous condition or requires immediate correction or repair to prevent further loss to CITY or to prevent interruption of operations, CITY will attempt to give the OWNER notice. If OWNER cannot be contacted or does not comply with CITY's request for correction within a reasonable time as determined by CITY, CITY may proceed to make such correction or provide such repair. The costs of such correction or repair shall be charged against OWNER, who agrees to make payment for said costs upon demand.

Corrective action by CITY will not relieve OWNER or OWNER's sureties or insurers of the guarantees and indemnities of this agreement.

This paragraph does not in any way limit CITY's remedies pursuant to Code of Civil Procedure, Agreement -5 of 8
December 16, 2025, Item #7
Section 337 and 337 .15, or the guarantee on any items for which a longer guarantee is specified or on any items for which a manufacturer or supplier gives a longer guarantee period. OWNER agrees to act as a co-guarantor with such manufacturer or supplier, and shall furnish CITY all appropriate guarantee or warranty certificates upon completion of the project. No manufacturers guarantee period shall in any way limit the liability of OWNER or OWNER's sureties and insurers under the indemnity or insurance provisions of this agreement.

10. EASEMENTS AND FEE INTERESTS: OWNER shall at OWNER's sole cost and expense, furnish CITY with appropriate easements and fee title to required facilities sites for the entire work, free and clear of all liens, encumbrances, restrictions, and covenants, other than current real property taxes then a lien but not yet payable. At OWNER's cost and expense, OWNER shall furnish CITY with an acceptable title insurance policy insuring CITY has title as required above with an endorsement insuring CITY against mechanic's lien claims arising out of the performance of the work. Easements shall be in standard form acceptable to CITY, shall be not less than the width CITY determines necessary to maintain the work and shall be executed and delivered to CITY concurrent with execution of this agreement. Easements shall be recorded prior to CITY accepting the work or furnishing services to any portions of the property under development (other than those as may be delivered under a temporary service agreement with OWNER).

11. CONTRACTORS AND AGENTS: OWNER shall be as fully responsible to CITY for the acts and omissions of OWNER's contractor and of the persons directly or indirectly employed by OWNER's contractor as OWNER is for the acts and omissions of persons directly or indirectly employed by OWNER. Nothing contained in the agreement shall create any contractual relationship between any contractor or others and CITY. OWNER shall bind every contractor to be bound by the terms of this agreement.

12. DEFAULT BY OWNER: OWNER shall be in default of this agreement if, in the sole discretion of the CITY, OWNER refuses or fails to construct the improvements required hereby in a workmanlike manner, or OWNER refuses or fails to prosecute the work or any separable part thereof with such diligence as will ensure its completion within the time specified herein, or any written extension thereof, or fails to complete such work within such time, or if OWNER should be adjudged bankrupt, make a general assignment for the benefit of creditors, or if a receiver should be appointed on account of OWNER's insolvency or if OWNER or the contractor, or any of their subcontractors violate any of the provisions of this agreement, or if OWNER fails to make prompt payment for materials or labor or if OWNER disregards laws, ordinances, or instructions of CITY. CITY shall serve written notice upon the OWNER and OWNER's surety of its intention to declare this agreement in default. Said notice will contain the reasons for such intention to declare a default. Unless, within ten (10) days after the service of such notice, such violations shall cease and satisfactory arrangements for the corrections thereof be made, this agreement shall upon the expiration of said time be in default.
8 of 15
Upon such default, CITY shall serve written notice thereof upon the surety and OWNER, and the surety shall have the right to take over and perform this agreement. If the surety does not, within fifteen (15) days after the serving upon it of a notice of default, give CITY written notice of its intention to take over and perform this agreement or does not commence performance thereof within thirty (30) days from the date of CITY's notice, CITY may take over the work and prosecute the same to the extent of completion it deems necessary by contract or by any other method it may deem advisable for the account and at the expense of OWNER, and the surety shall be liable to CITY for any cost or other damage occasioned CITY thereby. In such event, CITY may, without liability for so doing, take possession of and utilize in completing such work, such materials, appliances, plants, and other property belonging to OWNER that may be on the site of the work and be necessary therefore. Should surety fail to take over and diligently Agreement - 6 of 8
December 16, 2025, Item #7
perform
the
agreement
upon
Principal's
default,
surety
agrees
to
promptly,
on
demand,
deposit
with
CITY
such
amount
as
CITY
may
reasonably
estimate
as
the
cost
of
completing
all
of
OWNER's
obligations.

For
any
such
work
that
CITY
elects
to
complete
by
furnishing
its
own
employees,
materials,
tools,
and
equipment,
CITY
shall
receive
reasonable
compensation
therefore,
including
costs
of
supervision
and
overhead.

CITY
may,
at
its
option,
elect
not
to
complete
any
or
all
of
the
work
and
may
elect
not
to
accept
any
of
the
work
already
completed.

If
CITY
elects
not
to
accept
any
of
the
work,
then
all
CITY's
obligations
to
OWNER
and
the
lands
to
be
served shall
terminate.

CITY's
obligations
to
OWNER
and
the
lands
to
be
served
shall
continue
to
the
extent
of
any
acceptance,
subject
to
CITY's
right
to
offset
any
sums
due
it.

The
foregoing
provisions
are
in
addition
to,
and
not
in
limitation
of,
any
other
rights
or
remedies
available
to
CITY.

13. REMOVAL
OF
IMPROVEMENTS:

If
the
work
is
suspended
or
otherwise
not
continuously
prosecuted
for
any
cause
whatsoever,
within
or
without
the
time
for
completion,
OWNER
shall,
at
OWNER's
sole
cost
and
expense,
remove
and
replace
all
or
any
portion
of
the
work
already
completed
and
inspected
which
CITY,
in
its
sole
discretion,
determines
is
substandard,
damaged,
or
may
constitute
danger
to
the
public.

14. ATTORNEY
FEES
AND
COSTS:

Should
CITY
engage
an
attorney
to
enforce
any
provision
of
this
agreement
or
to
defend
any
claim
brought
by
anyone
arising
out
of
the
failure
of
OWNER
to
perform
any
of
OWNER's
obligations
under
this
agreement,
OWNER
shall
pay
all
of
CITY's
attorney's
fees
incurred
in
connection
therewith,
with
or
without
suit,
whether
or
not
said
attorney
is
in
the
regular
employ
of
the
CITY.

15. FUTURE
CHARGES:

Nothing
in
this
agreement
shall
relieve
OWNER
or
OWNER's
successors
or
assigns
of
any
obligation
to
pay
any
connection,
installation, expansion
or
other
fees,
charges,
or
other
expenses,
including
operation
and
maintenance
expenses,
required
under
any
present
or
future
established
ordinances,
rules,
regulations,
and
policies
of
CITY.

16. ASSIGNMENT:

The
performance
of
the
agreement
may
not
be
assigned,
by
OWNER
except
upon
the
written
consent
of
CITY.

Consent
will
not
be
given
to
any
proposed
assignment
which
would
relieve
OWNER
or
OWNER's
sureties
of
their
responsibilities
under
the
agreement,
unless
CITY
finds
that
assignee
can
perform
this
agreement
and
provide
security
comparable
to
that
provided
by
OWNER.

17. NOTICE:

All
notices
required
hereunder
shall
be
deemed
served
or
given
upon
the
earlier
of
actual
receipt
or
deposit
in
the
United
States
Mail,
first
class
postage
prepaid,
addressed
to
OWNER
at
the
address
set
forth
below,
to
the
surety
at
the
address
in
the
security
instrument,
and
to
CITY
at
P.O.

Box
789,
Poway,
California
92074-0789.

Agreement
-7 of
8 9
of
15 December 16, 2025, Item #7
OWNER: New Pointe Investment 52 LLC
Agreement Date

SCHEDULE A TO STANDARD AGREEMENT

FOR CONSTRUCTION OF PUBLIC IMPROVEMENTS
(Sage at Old Coach -IMP22-001)
This schedule is attached to and made a part of the Standard Agreement for Construction of Public Improvements between CITY and OWNER for the above-referenced project. The following correspond to the paragraph numbers of the agreement.

1. Completion Date:

2. Liability Insurance Limits:

3. a. Approved Cost Estimate:
b. Approved Security Amount:

Performance
Payment
(Labor & Materials)

4. Deposit/Fee Amount:

Prior to issuance of first Building Permit or two
(2) years from the date of this agreement,
whichever comes first.
$2,000,000.00, combined limit each occurrence
$270 200.00
$270,200.00
$135,100.00
See Note Below

5. Warranty Security Amount: =$=27'-''=0=20=·-=-0..:;...0 ________ _ (To be posted prior to acceptance of work)
Note: Prior to start of construction, a deposit shall be paid to the City to cover inspection fees and related post-plan approval tasks. The minimum deposit shall be based on the City's fee rate at the time of payment.

Schedule A to Standard Agreement - 1 of 1
10 of 15
December 16, 2025, Item #7
OWNER
New
Pointe
Investment
52 LLC
Agreement
Date

SCHEDULE
B
(MONUMENT

SETTING)
TO

STANDARD

AGREEMENT
FOR

CONSTRUCTION
OF
PUBLIC

IMPROVEMENTS
(Sage
at
Old
Coach
-
IMP22-001)
This
schedule
is
attached
to
and
made
a
part
of
the
Standard
Agreement
for
Construction
of
Public
Improvements
between
CITY
and
OWNER
for
the
above-referenced
property.

Security
Amount:
..._$_6
...... ,2~1_0_.o_o
_____
_

1. Monument
Setting.

OWNER
at
OWNER's
sole
cost
and
expense
shall
within
thirty
(30)
days
of
acceptance
of
the
work,
cause
a
licensed
surveyor
engineer
to
set
all
monuments
and
stakes
not
installed
on
the
date
of
recording
of
the
Final
Map
for
the
above
reference
property,
or
which
having
been
set
were
removed,
altered
or
destroyed
before
acceptance
.

2. Security
Deposit.

OWNER
concurrently
herewith
shall
deposit
the
amount
specified
above
in
a
form
approved
by
the
City
engineer,
as
additional
and
independent
security
for
the
performance
of
the
setting
and
payment
of
the
engineer
or
surveyor.

3. Notice
of
Setting.

Within
five
(5)
days
after
the
final
setting
of
all
monuments
has
been
completed,
the
engineer
or
surveyor
shall
give
written
notice
thereof
to
OWNER
and
the
CITY.

4. Payment
of
Engineer.

Upon
completion
of
setting
to
CITY's
satisfaction
and
payment
to
the
engineer
or
surveyor,
OWNER
shall
present
to
CITY
evidence
of
such
payment
and
receipt
thereof
by
the
engineer
or
surveyor
and
the
deposit
will
then
be
refunded
to
OWNER.

5. Nonpayment.

If OWNER
does
not
present
evidence
of
payment
and
if the
engineer
or
surveyor
notifies
the
CITY
of
nonpayment,
the
CITY
may,
within
three
(3)
months
from
the
date
of
said
notification,
pay
the
engineer
or
surveyor
the
amount
due
from
any
deposit
or
security
therefor.

6. Death
or
Disability
of
Engineer.

Upon
the
death,
disability
or
retirement
from
practice
of
or
refusal
to
act
by
the
engineer
or
surveyor
charged
with
the
responsibility
for
setting
monuments,
CITY
may
direct
its
engineer
or
such
engineer
or
surveyor
as
it
may
select,
to
set
the
monuments.

If
the
original
engineer
or
surveyor
is
replaced
by
another,
the
former
may,
by
letter
to
CITY,
release
the
right
to
set
the
final
monuments
to
the
substitute
surveyor
or
engineer.

When
the
monuments
are
so
set,
the
substitute
engineer
shall
amend
any
Final
Map
in
accordance
with
the
correction
and
amendment
provisions
of
Sections
66469
through
66472
of
the
Subdivision
Map
Act.

All
provisions
of
this
agreement
relating
to
payment
shall
apply
to
the
service
performed
by the
substitute
engineer
or
surveyor.
11 of
15 December 16, 2025, Item #7
CITY
OF
POWAY
By
~
ChrisHazeme,Clty
Manager
OWNER
:

New
Pointe
Investment
52 LLC
c/o
New
Pointe
Communities
Inc
.

ADDRESS:
16880
West
Bernardo
Drive
#110
San
Diego,
Ca
92127
PHONE:
(858)
451
-8700
(Signatures
Must
Be
Notarized)
Approved
as
to
Form
:

Office
of
the
City
Attorney
Alan
Fenstermacher,
City
Attorney
Date
12 of
15 Agreement
- 8
of
8 December 16, 2025, Item #7

ACKNOWL

EDGMENT
A
notary
public
or
other
officer
completing
this
certificate
verifies
only
the
identity
of
the
individual
who
signed
the
document
to
which
this
certificate
is
attached,
and
not
the
truthfulness,
accuracy,
or
validity
of
that
document.

State
of
California
County
of
San
Diego
On
May
4,
2023
before
me,
Carrie
Lynn
Byrd
1 Notary
Public
(insert
name
and
title
of
the
officer)
personally
appeared
Scot
C.

Sandstrom
who
proved
to
me
on
the
basis
of
satisfactory
evidence
to
be
the
person(s)
whose
name(s)
is/are
subscribed
to
the
within
instrument
and
acknowledged
to
me
that
he/she/they
executed
the
same
in
his/her/their
authorized
capacity(ies)
, and
that
by
his/her/their
signature(s)
on
the
instrument
the
person(s),
or
the
entity
upon
behalf
of
which
the
person(s)
acted,
executed
the
instrument.

I certify
under
PENAL
TY
OF

PERJURY
under
the
laws
of
the
State of
California
that
the
foregoing
paragraph
is
true
and
correct.

WITNESS
my
hand
and
official
seal.
············1
,,•
"'
,.,
CARRIE
LYNN
BYRD
• -
Notary
Public
• Califor,ia
:
!
San
Di'i<)
County
~
,
Commiss
ion
f 21882'2
-
• o•
,.

My
Comm
. ExpirM
Dec
25 . 2025
(Seal)
13 of
15 December 16, 2025, Item #7
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE§ 1189
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of San Diego
on May 31, 2023 before me, __ Y_v_o_n_n_e_M_a_n_n_io_n~,_N_o_t_a ..... ry_P_u_b_lic ____ _ Date Here Insert Name and Title of the Officer
personally appeared _________ C..c....;..h;;_ri'-"s_H'-'--'-a'-z_;:_e_;_lt'-in_;_e;;__ ____________ _ Name(s) of Signer(s)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. eo•••••••~ YVONNE MANNION
Notart Public • California %
San Diego County la
Commission # 2363699 -
y Comm. Expires Jul 1, 2025
Place Notary Seal Above
I certify under PENAL TY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.
' .

Signature-::::,....J.-;'-1. _l,_tJ_t_ci_~_-_,_·l-+-c'l_,._v_,,_·..,_.-) _____ _ Signature of Notary Public
---------------OPTIONAL---------------
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Title or Type of Document: Standard Agreement for Construction of Public Improvements IMP22-001 Document Date: __________________ Number of Pages: _____ _ Signer(s) Other Than Named Above: ______________________ _ Capacity(ies) Claimed by Signer(s)
Signer's Name: ___________ _ Signer's Name: ___________ _ □ Corporate Officer -Title(s): ______ _ □ Corporate Officer -Title(s): ______ _ □ Partner -□ Limited □ General □ Partner -□ Limited □ General □ Individual □ Attorney in Fact □ Individual □ Attorney in Fact □ Trustee □ Guardian or Conservator □ Trustee □ Guardian or Conservator □Other: ______________ _ □ Other: _____________ _
Signer Is Representing: ________ _ Signer Is Representing: ________ _ ~~~'%~~~~~~~~~~~~~~~
©2016 National Notary Association• www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 14 of 15
December 16, 2025, Item #7

CALIFORNIA

ACKNOWLEDGMENT
CIVIL
CODE
§
1189
A notary
public
or
other
officer
completing
this
certificate
verifies
only
the
identity
of
the
individual
who
signed
the
document
to
which
this
certificate
is
attached,
and
not
the
truthfulness,
accuracy,
or
validity
of
that
document.

State
of
California
County
of
lAt1
])'es()
}
On
Wo,
'-i
q,
20 Z3
1 Date
()
personally
appeared
~\
..... W~-
o_+~-c~·-cA~a~L~rids'-=_,_fn~-_._n-'-'r:D-:----'--"~---------­ Name(s)
of
Signer(s)
who
proved
to
me
on
the
basis
of
satisfactory
evidence
to
be
the
person(s)
whose
name(s)
is/are
subscribed
to
the
within
instrument
and
acknowledged
to
me
that
he/she/they
executed
the
same
in
his/her/their
authorized
capacity(ies),
and
that
by
his/her/their
signature(s)
on
the
instrument
the
person(s),
or
the
entity
upon
behalf
of
which
the
person(s)
acted,
executed
the
instrument.
•;:~
•~
CARRIE
LY:-4N
BYRD
Notar,
?\.b1ic
• Ca1ifor~ia
:

San
Diego
County
!
Commission:
2388292
y Comm
. Expires
Dec
25,
2025
Place
Notary
Seal
and/or
Stamp
Above
I certify
under
PENAL
TY
OF

PERJURY
under
the
laws
of
the
State
of
California
that
the
foregoing
paragraph
is
true
and
correct.

WITNESS
my
hand
and
official
seal.

Signature

OPTIONAL
Completing
this
information
con
deter
alteration
of
the
document
or
fraudulent
reattachment
of
this
form
to
on
unintended
document.

Description
of
Attached
Document
Title
or
Type
of
Document:
___________________________
_
Document
Date:
_____________________
Numberof
Pages
: ___
_
Signer(s)
Other
Than
Named
Above:
______________________
_
Capacity(ies)
Claimed
by
Signer(s)
Signer's
Name
:

Signer's
Name
: ___________
_
o
Corporate
Officer
-
Title(s)
: ______
_
o
Corporate
Officer
-
Title(s):
______
_
o
Partner
-
o
Limited
o
General
o
Partner
-
o
Limited
o
General
o
Individual
o
Attorney
in
Fact
o
Individual
o
Attorney
in
Fact
o
Trustee
o
Guardian
or
Conservator
o
Trustee
o
Guardian
or
Conservator
D
Other:

D
Other
:

Signer
is
Representing:
_________
_
Signer
is
Representing:
_________
_
)~@!OO@g{'l:l9g~@g}~~ffi98{,,~ta¼llillill~@g}~~2®1!@~$g~~illill@ ©2019 National
Notary
Association
15 of
15 December 16, 2025, Item #8
DATE:

TO:

FROM:

CONTACT:

SUBJECT:

Summary:

AGENDA REPORT CityofPoway
December 16, 2025
Honorable Mayor and Members of the City Council
Julie Procopio, Director of Development Services Cf
Kevin Parker, AICP, Senior Planner
(858) 668-4656 or [email protected]

CITY COUNCIL
Development Review 25-0001 and Tentative Tract Map 25-0001, a Request for an Additional West Village Multi-Family Building and Private Dog Park (Fairfield II) within the Town Center Land Use District of the Poway Road Corridor Specific Plan located at 12947 Poway Road, (APN 317-490-68-00)
Fairfield Residential (Applicant) is requesting a Development Review (DR) 25-0001, and Tentative Tract Map (TTM) 25-0001 for the redevelopment of an existing 30,056 square foot parcel formerly occupied by Big O Tires, adjacent to the West Village Poway multi-family community (Fairfield Poway) to construct a 24,382 square foot, three-story multi-family building, and a 1,640 square foot private dog park (Project). The Project requires the demolition of the vacant 4,448 square foot tire shop with the construction of a new market-rate residential multi-family building that contains 16 multi-family units, 13 individual one-car garages and 34 uncovered at-grade parking stalls. The Project site is within the Town Center (TC) land use district of the Poway Road Corridor Specific Plan (PRSP).

The Project expands the existing Fairfield Poway (also owned by the Applicant), by increasing the total number of units from 212 to 228 and increasing the number of multi-family buildings from five to six.

The project is architecturally compatible with the design and characteristics of the adjacent Fairfield Poway. TTM 25-0001 is a condominium map for future individual unit ownership.

The applicant is requesting a Tier 1 incentive in accordance with Table 3-4 of the PRSP to allow a third story on the rear of the building due to the downward slope along the south side of Poway Road. This will allow for enclosed garages tucked under the units. The applicant proposes a lot tie agreement and future lot consolidation through a tentative/final map to unlock the Tier 1 incentives. The applicant also proposes to improve the largest commercial space, host monthly events and make the space available for events until a permanent tenant is secured for the commercial space.

Recommended Action:

It is recommended the City Council conduct a public hearing, find and determine the Project is consistent with the California Environmental Quality Act (CEQA) Class 32 Categorical Exemption environmental determination made for this Project and adopt the attached Resolution (Attachment A) approving DR 25-0001 and TTM 25-0001.
1 of 38
December 16, 2025, Item #8
Discussion:

Background
On December 1, 2020, the City Council approved DR 20-002, and TTM 20-003 to construct the Fairfield Poway on the adjacent parcel (APN 317-491-01-00) to the west of the Project site. The Fairfield Poway project consolidated and redeveloped two large commercial shopping centers that contained the former Poway Fun Bowl and Carriage Center buildings for the creation of a 6.6-acre lot. The project included the demolition of the existing structures, grading and the construction of five multi-family buildings with a total of 212 market-rate multi-family units.

The Tract Map (TTM 20-003) included a condominium map for future individual unit ownership. The Fairfield Poway project provides 359 onsite parking spaces, along with 17 additional parking spaces through a reciprocal parking agreement with the adjacent Big O Tires parcel (Project site) resulting in an overall surplus of three parking spaces. The Fairfield Poway project includes 11,364 square feet of commercial space designated for two future restaurants, as well as 9,955 square feet of public park space along the Poway Road frontage. The amenities in the public park space contain outdoor seating areas, flag poles, public art, oak trees, a children's play area and a small public dog park.

The Fairfield Poway project qualified for the maximum Tier 2 incentives as outlined in Table 3.4 of the PRSP through a qualifying lot consolidation and three community benefits including construction of a public park, restaurant row and contribution to the Community Benefit Fund. Tier 2 incentives allow four-stories and 45 feet height on properties that slope down from Poway Road and three-stories and 38 feet height along Poway Road. The height of the existing Fairfield Poway buildings as defined by the Poway Municipal Code (PMC) to be from the average ground level to the top of the mansard roof deck is 43'-4" along the rear of the buildings and ranges from 23'-1 O" to 37'-1 O" along Poway Road.

Fairfield Poway received its final building inspection and Certificate of Occupancy on November 13, 2024. The Applicant is actively marketing the commercial spaces to prospective tenants.

The former Big O Tires shop was constructed and began operation in 1976 under the County of San Diego's jurisdiction. On April 13, 1993, the City Council approved Conditional Use Permit (CUP) 92-09 for a 516 square foot addition to the existing tire shop. lnJune of 2024, Big O Tires closed permanently.

In recent years, the State legislature has enacted several new housing laws designed to encourage housing production. Government Code 65589.5 (the Housing Accountability Act) states a local agency cannot reject, reduce the permitted density or make infeasible housing without a thorough analysis of the economic, social and environmental effects of the action and without making written findings based on the preponderance of the evidence in the record that either 1) the project as proposed would have a specific, adverse impact on the public health or safety and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact without rendering the development infeasible, or 2) the project is inconsistent with both the jurisdiction's zoning ordinance and general plan land use designation as it existed on the date the application was deemed complete. In other words, if a residential project complies with the project site's applicable General Plan, Specific Plan and zoning requirements, it cannot be denied absent a finding that it would result in a specific, adverse impact on public health or safety and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact without rendering the development infeasible Project Analysis
The project site is located along the south side of Poway Road between Carriage Road and Civic Center 2 of 38
December 16, 2025, Item #8
Drive at 12947 Poway Road, within the TC land use district of the PRSP (Attachment B). DR approval from the City Council is required for all multi-family residential projects. The Project proposes redeveloping an existing 30,056 square foot parcel formerly occupied by Big O Tires to construct a 24,382 square foot, multi-family building, and a 1,640 square foot private dog park. TTM 25-0001 is a proposed condominium map for future individual unit ownership. The Project requires the demolition of the vacant 4,448 square foot tire shop with the construction of a new market-rate residential multi­ family building that contains 10 one-bedroom units, six two-bedroom units, 13 individual one-car garages and 34 uncovered at-grade parking stalls. The Project provides three different floor plans as shown in the attached plan set (Attachment C).

The proposed expansion of the existing Fairfield Poway increases the total number of units from 212 to 228 and increases the number of multi-family buildings from five to six. The Project is architecturally compatible with the design and characteristics of the adjacent Fairfield Poway. All residents within the Fairfield Poway community will have access to the proposed private dog park, as the Project's residents will also have access to all existing multi-family community amenities. According to Table 3- 1 of the PRSP, the project's land use (residential multi-family dwellings) is permitted. Table 1 below generally describes the land uses surrounding the project site:

Table 1 -Surrounding Land Uses
Direction Land Use Designation Current Land Uses
North Residential Condo (RC)
1 Condominiums
----!_a_g_ ~ ---Town Center-PRSP -J -ca-;:-;:ental facility -I South Town Center-PRSP Apartr:r:ien~s_ I
W~t__ __ j _ -Town Ce_!2ter-P~SP _ ~partm~ri_t~_ I
Building Height
The Project is three-stories in height, with two stories visible on the north elevation along Poway Road, due to the downward slope south of Poway Road. The first floor of the Project consists of space for building egress, 13 individual one-car garages, and two utility closets. Based on detailed analysis of the existing grades, the first floor does not qualify as a basement under the PMC as originally presented at the predevelopment conference. The Applicant provided an updated basement calculation exhibit showing more than fifty percent of the exterior walls for the first story are to be exposed, not allowing the garage area to be considered a basement. However, the elevations show the garages are not visible from Poway Road.

Table 3-2 of the PRSP indicates two-stories and 35 feet building height are allowed in the TC land use district. However, with a qualifying lot consolidation, the Project is eligible for the PRSP Tier 1 height incentive of three-stories and 38 feet. The PMC defines the building height to be measured from the average grade of all four corners of the building. Using this definition, the average building height is 29'-11". The rear of the building is 33'-6" high and three-stories. The building height for the Project along Poway Road is two-stories and 26'-8" from the ground level to the top of the mansard roof deck, or roughly 11 feet shorter than the existing Fairfield Poway project.

Lot Consolidation
To be eligible for the Tier 1 incentive, the Applicant proposes to consolidate the lot with the adjacent Fairfield Poway parcel. The lot consolidation request would require an additional TTM, since the Fairfield Poway parcel has an existing Final Tract Map (FTM) for a condominium map. Prior to the 3 of 38
December 16, 2025, Item #8
issuance of a building permit, the Applicant will record a lot tie agreement and provide security to guarantee completion of the lot consolidation. The TTM consolidating the Fairfield Poway parcel with the Project site will require City Council approval at a future meeting.

Poway Road Setbacks
The property line is located 8'-8" south of the face of the curb along Poway Road. Ground floor residential requires a 10-foot minimum front setback. The Project proposes the building be set back 10-feet from the north property line along Poway Road, with two one-foot projections into the setback at each corner of the building. The "Projections into Setbacks" section of the PRSP allows for lobbies, porches, stoops, and other entry related architectural features to extend up to four feet into the required front setback area. The proposed building is set back from Poway Road an average of three feet more than the existing Fairfield Poway buildings. The Project's front setback area is shown below in Figure 1:

Figure 1-Front Setback Area (Poway Road)
--
. i . ==, ~-~
. . -r,eae1,nT1irJAl~"Ui ;=~rJsr.i CMn.m'.sll(AJ'~sf'.lfs'J.'"=C"n:.rtsr~=\][sJ:rtnI1~1 "''· Development Standards
10' RESIDENTIAL

SETBACK
The Project's compliance with the TC land use district development standards of the PRSP are outlined below in Table 2:

Table 2 -Town Center Development Standards
Development Standard Required Proposed Conforms
Density
Minimum Setbacks:

Front (Ground floor residential)
Rear (Adjacent residential)
, Interior (Ground floor residential)
Maximum Height with PRSP Teir 1
Height Bonus Incentive
Maximum Lot Area Coverage
Minimum Landscaped Area
(Required setbacks excluded)
Parking
24 dwelling
units/acre
1 O feet
15 feet
1 O feet
3-stories/
38 feet
65%
10% of net

23.2 dwelling units/acre
16 units/0.69 net acres
1 O feet I
-----~; ;::~ ---l
2-stories/29'-11" feet on Poway Rd I
3-stories/ 38'-7" feet on rear [
30%
6,551 SF
22% I
Yes
Yes
Yes
Yes
Yes
Yes
Yes
The Project will provide 34 at-grade parking spaces and 13 one-car garages, for a total of 47 parking spaces. The reciprocal parking agreement between Fairfield Poway and the Project site requires 17 parking spaces to be allocated on the Project site. The Project requires 26 parking spaces, leaving an overall surplus of four parking spaces as indicated below in Table 3:
4 of 38
December 16, 2025, Item #8
Table 3 -TC-PRSP Parking Requirements
• • • -Category • # Units· Parking.Ratio_ ~.·.;Required Spaces' 1-bedroom units 10 I _ 1 _space per unit 10
r-2-bedroom units 6 I 2 spaces__per:__unit _ 12
--------
I
---
I Guest parking per unit __ 16 0.25 space_per unit_ 4 -------- I
Parking Allocation Req.

I
Fairfield
I
Reciprocal Agreement
I
17 i
Poway I (Includes Surplus of 3) I
Requirec!_F'arking Total I __ L_
I
43 Project Parking Inventory I I 47
Parkjng S_urplu_s _J 1 j 4 -
PRSP Commercial Frontage Requirements
One of the goals of the PRSP is to activate the street frontage within the TC land use district through active retail storefronts and walk-in commercial uses. The TC land use district requires a minimum of 75 percent of the ground floor space along any block face of Poway Road to consist of active commercial uses. Table 4 below provides analysis of the Project once consolidated with the Fairfield Poway project, which when combined, meet the overall intent of the PRSP with a mixture of commercial and public spaces:

Table 4 -Commercial Ground Floor Block Face Percentages Buildings 1 & 2 Fairfield Poway '
Public Tot-P~rk/O~tdoo-;:seating r
__ Fairfield Poway I
Th~~oject
_ The P~ojec! ~ Fa~ield Poway
Architecture
Yes ----
Public Amenity
PRSP 4-6 & 4-30
No --
Mixed
368
140
150
658 ------
' - ---·--100
100
0 77.2 J
The Project is an extension of the Fairfield Poway design with Spanish mission architecture including red tile mansard roofs, which are designed to screen rooftop HVAC equipment. The Project's building is proposed with mission style arches, earth tones, decorative trims and accent colors. The high quality design meets the criteria of the PRSP by providing visual interest, which breaks up the mass and bulk of the building. The Project rendering is shown in Figure 2:

Figure 2-Project Rendering
5 of 38
December 16, 2025, Item #8
Restaurant Row Vacancies -Fairfield Poway
While the Applicant has made efforts to fill the vacant commercial spaces within the Fairfield Poway project with quality commercial tenants, the spaces are vacant. Recognizing a key aspect of the vision of the PRSP was to create a vibrant downtown streetscape, the Applicant has committed to the following for the existing commercial spaces:
• Improving the easternmost commercial space of the Fairfield Poway Restaurant Row as an event space including installing a concrete floor, restroom, lighting, paint, heating and ventilation. Improve the connected outdoor space with lighting and gates, as required. • Obtain and temporary use permit and host monthly events in the space while also making the space available for other private/community events.
• Complete additional marketing efforts include wayfinding and parking signage, and preparation of conceptual layout plans for improvement of two commercial spaces, including the easternmost commercial space.
• Meet monthly with the City to share details of recruitment efforts with potential tenants, including incentive offers, lease term flexibility, and below market rents offered.

Predevelopment Conference
On May 6, 2025, Staff presented the Applicant's proposal (PDC 25-0002) to City Council, where direct feedback was provided to the Applicant. Preserving setbacks and heights along Poway Road was a common theme amongst the Council members. The proposal included four street-level private patios projecting three feet into the front setbacks. Council strongly encouraged for the Applicant to revise the plans, so that the street-level patios do not encroach into the front setbacks. Although the "Projections into Setbacks" section of the PRSP (PRSP 4-7) allows for lobbies, porches, stoops and other entry related architectural features to extend up to four feet into the required front setback area, the Applicant took heed to the Council's feedback and updated the Project to remove patio projections into the setback. A one-foot projection into the setback is proposed at each corner/entry to the building.

Neighborhood Meeting
On May 12, 2025, the Applicant hosted a neighborhood meeting in the City Council Chambers from 5:30 to 6:30 p.m. There were nine community members in attendance. Community feedback included questions regarding the PRSP; timing on signing leases for restaurant tenants; comments on the existing Fairfield Poway project; how to access the existing public dog park from Poway Road; internal vehicular access on the site; dimensions from the face of the curb to the front property line; affordable housing opportunities; praise for the project for providing additional multi-family housing units for the community; and questions regarding the height of the proposed building. The Applicant addressed all questions, concerns and comments raised by the community to the extent possible.

Conclusion
Based on the above analysis, the Project as conditioned meets the TC development standards of the PRSP with a high-quality design. The Applicant is requesting a Tier 1 incentive to allow for three-stories along the rear of the building through a proposed lot tie agreement and future lot consolidation. The Applicant has also offered to make substantial improvements to provide an event space within a currently vacant commercial space and host events to accomplish the vision of the PRSP. Staff recommends approval of the Project.
6 of 38
December 16, 2025, Item #8
Environmental
Review:

Staff
has
reviewed
the
proposed
project
for
compliance
with
CEQA
and
has
determined
that
the
project
is
Categorically
Exempt
from
environmental
review
pursuant
to
CEQA
Guidelines
Section
15332
(Class
32:

In-Fill
Development
Projects).

The
project
is
for
the
construction
of
a
24,382
square
foot,
three-story,
16-unit
multi-family
building
with
13 one-car
garages,
34 uncovered
at-grade
parking
stalls,
and
a 1,640
square
foot
private
dog
park
. The
project
site
consists
of
a 30,056
square
foot
parcel
located
within
an
urbanized
portion
of
the
City
of
Poway
and
is
surrounded
by
existing
commercial
and
residential
development.

The
project
meets
all
criteria
for
a Class
32 exemption.

Additionally,
Staff
has
reviewed
the
project
in
accordance
with
CEQA
Guidelines
Section
15300.2
and
determined
none
of
the
exceptions
to
the
use
of
a categorical
exemption
apply.

Based
on
the
findings
outlined
in
Section
1 of
the
Resolution,
Staff
determined
the
project
to
be
Categorically
Exempt
from
CEQA
pursuant
to
CEQA
Guidelines
Section
15332.

In
addition,
the
Project
is
consistent
with
the
PRSP's
Programmatic
Environmental
Impact
Report
(PEIR)
that
was
prepared
according
to
CEQA
and
certified
by
the
City
Council
on
December
5,
2017
(PRSP
EIR).

The
PRSP
EIR
analyzed
the
potential
impacts
of
the
proposed
buildout
of
the
Poway
Road
Specific
Plan
area
in
the
manner
permitted
by
the
Specific
Plan.

This
Project
is
consistent
with
the
PRSP,
as
it
conforms
with
all
development
standards,
and
the
PMC.

Fiscal
Impact:

The
requested
action
has
no
direct
fiscal
impact
to
the
City.

However,
the
removal
of
the
existing
Big
0 Tires
will
have
a
slight
reduction
in
sales
tax
revenues
to
the
City.

This
reduction
is
likely
balanced
with
an
increase
in
property
tax
revenues
to
the
City
once the
property
is
redeveloped
into
16 market
rate
multi-family
units.

Public
Notification:

A
Notice
of
Public
Hearing
was
published
in
the
Poway
News
Chieftain
on
December
4,
2025.

A
public
notice
was
mailed
to
property
owners
and
occupants
located
within
500
feet
of
the
Project
site,
and
the
Fairfield
Poway
project
site.

A
notice
of
pending
application
sign
was
posted
at
the
Project
site
.

Furthermore,
all
contacts
on
the
City's
interested
parties
list
were
provided
with
a
public
notice.

Attachments: A.

Resolution
B.

Zoning/Location
Map
C.

Plans
Reviewed/Approved
By:

Assistant
City
Manager
7 of
38 Reviewed
By:

Alan
Fenstermacher
City
Attorney
Chris
Hazeltine
City
Manager
December 16, 2025, Item #8
RESOLUTION NO. 25-

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

POWAY, CALIFORNIA, APPROVING DEVELOPMENT REVIEW
25-0001 AND TENTATIVE TRACT MAP 25-0001 FOR AN

ADDITIONAL WEST VILLAGE MULTI-FAMILY BUILDING WITHIN

THE POWAY ROAD SPECIFIC PLAN, TOWN CENTER
DISTRICT, ASSESSOR PARCEL NUMBER 317-490-68-00
WHEREAS, on December 16, 2025, the City Council considered Development Review (DR) 25-0001, and Tentative Tract Map (TTM) 25-0001; a proposed three-story, 16-unit residential apartment building with 13 one-car garages, 34 at-grade parking stalls, and a 3, 167 square foot private dog park (project hereinafter);
WHEREAS, on December 16, 2025, the City Council held a duly advertised public hearing to receive testimony from the public, both for and against, relative to this matter; WHEREAS, the development review plans and tentative tract map for this DR/TTM request included in the agenda report are incorporated by reference herein as Exhibit A; and WHEREAS, the City Council has read and considered the agenda report for the proposed project, including the attachments, and has considered all other evidence presented at the public hearing;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Poway as follows:

SECTION 1: The project is Categorically Exempt as a Class 32 Categorical Exemption from the California Environmental Quality Act (CEQA) pursuant to Section 15332 (Class 32: In­ Fill Development Projects) of the CEQA Guidelines. The project site consists of a 30,056 square foot parcel located within an urbanized portion of the City of Poway and is surrounded by existing commercial and residential development. The project meets all criteria for a Class 32 exemption, as follows:

A. The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations: The 16 -unit residential project is consistent with the Poway Road Corridor Specific Plan (PRSP) and Certified Programmatic Environmental Impact Report (PEIR, SCH#: 2017031035) that covers 1,148 new residential units, and 260,000 square feet of new commercial space. The proposed multi-family residential use, building height, site layout, and density meet the requirements of the PRSP. No variances or amendments that would require additional environmental analysis are proposed.

8. The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses: The project site is located within City limits on a lot less than five acres that is substantially surrounded by urban uses. The 0.69-acre parcel is fully developed and located within an established urban area characterized by existing roadway infrastructure and nearby commercial and residential uses. California Public Resources Code § 21080.66 (A8130) went into effect June 30, 2025, as a Statutory exemption that effectively increases the five-acres to 20-acres utilized by the Class 32 exemption. Although Condition of Approval No. 59 requires that the Project site is consolidated with the Fairfield Poway project under a separate planning entitlement, the balance of the two lots combined is 7.31-acres, well under the 20-acre maximum.
8 of 38 ATTACHMENT A
December 16, 2025, Item #8
Resolution
No
. 25-
Page
2 C.

The
project
site
has
no
value
as
habitat
for
endangered
, rare
or
threatened
species:

The
site
has
no
value
as
habitat
for
endangered,
rare
,
or
threatened
species
.

The
existing
development
consists
of
a
commercial
building
and
paved
surfaces.

Due
to
long-term
disturbance
and
lack
of
native
vegetation
or
habitat
features, the
site
does
not
support
sens
itive
biological
resources
.

D.

Approval
of
the
project
would
not
result
in
any
significant
effects
relating
to
traffic
, noise,
air
quality,
or
water
quality
: The
project
would
not
result
in
any
significant
environmental
effects
related
to
traffic,
noise
, air
quality
or
water
quality
. The
scale
and
intensity
of
the
proposed
residential
use
are
consistent
with
surrounding
development
and
would
not
result
in
significant
traffic
generation
or
other
environmental
effects.

Construction
activities
will
be
subject
to
compliance
with
City
of
Poway
Municipal
Code
requirements,
Poway
Noise
Ordinance
standards
,
and
BMPs
for
dust
control
and
stormwater
management.

E.

The
site
can
be
adequately
served
by
all
required
utilities
and
public
services
: The
site
can
be
adequately
served
by
all
required
utilities
and
public
services.

The
project
area
is
already
served
by
water,
sewer
, storm
drainage,
fire protection
and
other
municipal
services
with
suff
icient
capacity
to
support
the
proposed
development.

Additionally,
none
of
the
exceptions
to
the
use
of
a
categorical
exemption
in
accordance
with
CEQA
Guidelines
Section
15300.2
apply
. The
Project
site
is
not
located
on
a
hazardous
materials
site
, the
cumulative
impacts
have
been
analyzed
under
the
PRSP
PEIR
residential
unit
cap
and
it does
not
present
unusual
circumstances
that
would
result
in
significant
environmental
effects
. Therefore,
the
project
is
Categorically
Exempt
from
CEQA
pursuant
to
CEQA
Guidelines
Section
15332. SECTION
2:

The
City
Council
finds
that
the
proposed
project
is
consistent
with
the
PRSP
generally
, including
the
TC
District
designation
, and
further
, the
proposed
project
is
eligible
for
Tier
1 height
and
density
bonuses
(Table
3-4)
because
the
project
will
record
a
lot
tie
agreement
and
secures
a
future
lot
consolidation
as
that
term
is
defined
in
the
PRSP
with
the
following
findings
:

1. Minimum
lot
consolidation
shall
be
two
parcels
and

1. 5
acres.

Once
consol
idated,
the
total
parcel
size
will
be

7.31 acres.

2. Consolidated
parcels
are
required
to
have
a
minimum
150
feet
of
Poway
Road
frontage
.

The
consolidated
parcel
will
have
658
feet
of
Poway
Road
frontage
.

3. Consolidated
parcels
are
allowed
a
maximum
of
two
curb
cuts
for
vehicular
access
.

The
consolidated
parcel
will
have
only
two
driveways
(curb
cuts)
for
vehicular
access
.

SECTION
3: The
findings
for
DR
25-0001
,
in
accordance
with
the
PMC

17.52 .010
Purpose
of
DR,
are
made
as
follows:

A.

The
project
has
been
designed
to
be
architecturally
compatible
with
surrounding
development
and
conforms
to
the
PRSP
development
standards
and
design
guidelines
. The
Project
is
compatible
to
the
Fairfield
Poway
project's
five
buildings
with
the
use
of
Spanish
Mission
architecture
. The
stucco
exteriors,
wood
trim,
and
accents
will
feature
earth
tone
colors
which
is
consistent
with
the
Poway
General
Plan
and
the
PRSP.

Therefore
, the
project
respects
and
recognizes
the
interdependence
of
land
values
and
aesthetics
to
the
benefit
of
the
City
.
9 of
38 December 16, 2025, Item #8
Resolution No. 25-

Page 3 ends

B. The project has been designed to minimize impacts on surrounding development by utilizing a compatible architectural design consistent with the PRSP. The Project is designed to complement other buildings in the TC district. Therefore, the proposed development respects the public concerns for the aesthetics of development, and encourages the orderly and harmonious appearance of structures and property within the City.

C. The granting of the DR would not be materially detrimental to the public health, safety or welfare within the community. The Project meets the TC Development Standards for the PRSP, complies with the 2022 California Building Code.

D. The design and improvements of the Project are consistent with all elements of the Poway General Plan and the PRSP.

E. In accordance with Table 3-4 of the PRSP, the project includes a Tier 1 Height and Density Bonus with a qualifying lot consolidation for a third-story. This incentive is granted as a part of the project approval.

SECTION 4: The findings, in accordance with the State Subdivision Map Act (Government Code Section 66410 et. seq.) for TTM 25-0001, are made as follows:

A The TTM is consistent with the General Plan, in that it proposes to create residential and commercial units at a density consistent with the General Plan, Poway Municipal Code (PMC), and PRSP.

B. The design and improvements required of the TTM are consistent with the General Plan and PRSP, in that the approved density and lot size and configuration adheres to the standards of the General Plan and PRSP.

C. The site is physically suitable for the type of development and the density proposed, in that the site is large enough to accommodate the proposed density.

D. The design of the TTM is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat, in that the proposed project will be developed in accordance with City and other governmental agency requirements and mitigation measures will be incorporated pursuant to the PRSP EIR's Mitigation and Monitoring Reporting Plan (MMRP) and the Project is within a previously disturbed property that was a former tire shop.

E. The approval of the TTM is not likely to cause serious public health problems in that City water and sewer service will be provided to the project.

F. The design of the TTM will not conflict with any easement acquired by the public at large, now on record, for access through or use of the property within the subdivision in that the ultimate development of the site with residences can be accommodated without obstructing or otherwise impacting existing easements.

SECTION 5: The City Council hereby approves DR 25-0001, and TTM 25-0001, as shown on the approved plans incorporated by reference and stamped as "Exhibit A" dated December 16, 2025 (Exhibit A hereinafter) on file with the City, except as noted herein and subject to the following conditions:
10 of 38
December 16, 2025, Item #8
Resolution No. 25-

Page 4 ends

1. The applicant shall defend, indemnify, and hold harmless the City, its agents, officers, and employees from any and all claims, actions, proceedings, damages, judgments, or costs, including reasonable attorney's fees, collectively the "Claims" against the City or its agents, officers, or employees, relating to the issuance of any aspect of the project approval set for in this resolution, including, but not limited to, any action to attack, set aside, void, challenge, or annul this development approval (including but not limited to DR 25-0001, and TTM 25-0001) and any environmental document or decision made pursuant to CEQA. The City may elect to conduct its own defense, participate in its own defense or obtain independent legal counsel in defense of any claim related to this indemnification. In the event of such election, applicant shall pay all of the costs related thereto, including without limitation reasonable attorney's fees and costs. In the event of a disagreement between the City and applicant regarding litigation issues, the City shall have the authority to control the litigation and make litigation-related decisions, including, but not limited to, settlement or other disposition of the matter.

However, the applicant shall not be required to pay or perform any settlement unless such settlement is approved by applicant. Notwithstanding the foregoing, no indemnity shall be required for claims resulting from the exclusive gross negligence or willful misconduct of the City.

2. This approval is based on the existing site conditions and proposed project details represented on the approved plans stamped "Exhibit A" and on file at the Development Services Department. If actual conditions and details vary from representations on Exhibit A, the approved plans must be changed to reflect the existing site conditions and proposed project details. Any substantial changes to the approved plans must be approved by the Director of Development Services and may require approval of the City Council if the Director of Development Services finds that the proposed changes do not substantially conform to approved plans.

3. The developer is required to comply with the Poway Noise Ordinance (Chapter 8.08 PMC) requirements that govern construction activity and noise levels.

4. The proposed project shall comply with all mitigation measures established under the certified FEIR for the PRSP as specified in the Mitigation Monitoring and Reporting Program (MMRP).

5. The conditions for the Project shall remain in effect for the life of the subject property and shall run with the land and be binding upon future owners, successors, heirs, and transferees of the current property owner.

6. All Conditions of Approval for Resolution No. 20-091 shall remain in effect for the Fairfield Poway project, and all Conditions of Approval for Resolution No. 20-091 shall also apply to the Project site (APN 317-490-68-00). (Engineering)
Prior to approval of the final map:

7. Within thirty (30) days after tentative map approval, the applicant shall submit in writing to the City's Planning Division that all conditions of approval have been read and understood.
11 of 38
December 16, 2025, Item #8
Resolution No. 25-

Page 5 ends

8. This approval is based on the existing site conditions represented on the approved tentative map. If actual conditions vary from representations, the approved tentative map must be changed to reflect the actual conditions. Any substantial changes to the tentative map must be approved by the Director of Development Services.

9. The final map, together with the supporting data and documentation, shall be submitted to Engineering Division for review and approval. The appropriate map checking fee shall be paid by the applicant.

10. The final map shall conform to City standards and procedures, the City Subdivision Ordinance, the latest edition of the Subdivision Map Act, and the Land Surveyors' Act, and all other applicable laws, regulations and ordinances.

11. Any existing and proposed private or public easements, or easements to be vacated shall be depicted on the Final Map and grading plans. Easements shall include at a minimum (but are not limited to):
a. Private sanitary sewer easement.
b. Vacation of easement for pipelines and incidental purposes (water main).

12. Easements will be required for all public facilities and access onsite. This may include but is not limited to utilities, streets, sidewalks, and elevators.

13. If there is an instrument for Covenants, Conditions, and Restrictions (CC&R), which addresses construction and maintenance of the private road, slopes, utilities, drainage, or accesses in the subdivision, said CC&R shall be reviewed by the City prior to recordation.

14. Improvement plans prepared on a City of Poway standard sheet at a scale of 1" = 20', unless otherwise approved by the City project engineer, in accordance with the submittal and content requirements listed in the Poway Municipal Code shall be approved. Submittal shall be made to the Department of Development Services Engineering Division for review and approval. The improvement design shall be 100% complete at the time of submittal and ready for approval. The applicant shall pay the improvement plan check fees according to the latest adopted master fee schedule. The plan shall include, at a minimum, the following features:
a. Removal of public water main and appurtenances and restoration of improvements
b. Additional public improvements may also include but are not limited to:

Americans with Disabilities Act (ADA) accessibility signage and improvements

15. The applicant shall pothole and accurately identify the location of all existing utilities within the public right-of-way prior to approval of the improvement plans. It is anticipated that SDG&E and/or AT&T facilities are located behind the curb within this area. All utility and sidewalk improvements shall be designed based on the verified utility locations to ensure accuracy and to avoid conflicts. A minimum horizontal clearance of three (3) feet shall be maintained between SDG&E utilities and any adjacent utility trenches, and a minimum of one (1) foot shall be 12 of 38 •
December 16, 2025, Item #8
Resolution No. 25-

Page 6 ends

maintained between AT&T utilities and any adjacent utility trenches.

16. The public improvement plan shall be approved. The applicant shall enter into a Standard Agreement for public improvements for the work to be done as part of the Public Improvement plan. The applicant will be responsible for posting securities for monumentation and public improvements.

17. The applicant shall include provisions in their design contract with their design consultants that, following acceptance by the City, all construction drawings or technical reports accepted by the City (exclusive of architectural building plans) shall become the property of the City. Once accepted, these plans may be freely used, copied or distributed by the City to the public or other agencies as the City may deem appropriate. An acknowledgement of this requirement from the design consultant shall be included on all construction drawings at the time of plan submittal.

18. A cash deposit to the City, in an amount equivalent to $100.00 per sheet of the parcel map, for the mylar reproduction of the recorded tract map shall be posted.

If a mylar copy of the map is provided to the City within 3 months of its recordation or prior to building permit issuance, whichever comes first, the security shall then be returned. (See Poway Municipal Code Section 16.12.060 B for subdivider's responsibility to provide a reproducible mylar copy to the City.)

19. Within 30 days after City Council approval of the Final Map, the subdivider shall pay the City the sewer connection fee.

20. The applicant shall pay the drainage impact development fee in effect at the time of subdivision.

21. After subdivision, all parcels will continue to be considered one project as defined by the San Diego Regional Water Quality Control Board. Any future improvements (on either parcel) adding and/or replacing impervious area may cause the project to be classified as a Priority Development Project as defined in the Poway BMP Design Manual.

22. Prior to Final Map approval, a fair share payment shall be required towards future adaptive signalizing efforts for traffic signals along Poway Road between Carriage Road and Community Road. The fair share payment shall be determined through an engineering study prepared by a certified traffic engineer and subject to approval by the Director of Development Services. An updated memorandum including the additional residential units in the calculation of the fair share contribution shall be provided.

23. As the Project development is located within the Town Center (TC) Opportunity Area, it is subject to a fair share contribution which shall be applied toward the cost of all three pedestrian crossings within the TC area as shown in Figures 3-1 (Land Use Plan) and 6-4 (Pedestrian Improvements) of the Poway Road Corridor Specific Plan. The costs of the installation of the traffic signal and crossings at Carriage Heights Way by the Fairfield Poway are credited towards the midblock 13 of 38
December 16, 2025, Item #8
Resolution No. 25-

Page 7 ends

contribution for the Project. Due to the installation of the signal with the first phase of the Fairfield Development, the fair share payment towards future midblock crossings in the TC area is considered satisfied.

24. Applicant shall enter into a Private Facilities Maintenance Agreement for the private facilities associated with the development. The form and content shall be in a form satisfactory to the City Attorney.

25. Any private improvements within any publicly held easement or right-of-way may require an encroachment agreement as determined necessary by the City Engineer. All necessary encroachment agreements shall be approved and executed.

Prior to issuance of a Grading Permit:

26. Submit a precise grading plan for the development of the lot, including private utilities, prepared on a City of Poway standard sheet at a scale of 1" = 20', unless otherwise approved by the City project engineer. The plans shall use vertical datum NAVD88. Please be aware that all elevations in the Poway Benchmark list are datum NGVD 29 and will need to be converted. Submittal shall be made to the Department of Development Services Engineering Division for review and approval. The grading design shall be 100% complete at the time of submittal, ready for approval and issuance of permit. Incomplete submittals will not be accepted. All technical studies as required by Chapter 16 of the Poway Municipal Code shall be submitted. The applicant shall pay the grading permit and plan check fee according to the latest adopted master fee schedule.

27. Private utilities shall be shown on the grading plans and shall be built per City standards to the satisfaction of the Engineering Inspector.

28. The applicant shall incorporate Low Impact Development (LID) design features into the site dev-elopment. These shall be clearly shown and identified on the grading plan and be appropriately sized for the proposed level of development.

29. A drainage study addressing the impacts of the 100-year storm event prepared by a licensed Civil Engineer is to be submitted and approved. The study shall evaluate existing and proposed hydrologic and hydraulic conditions to the satisfaction of the City project engineer.

30. The project shall comply with the City and Regional Water Quality Control Board stormwater requirements. The project is considered a Priority Development Project and will be subject to all City and State requirements. A Final Storm Water Quality Management Plan (SWQMP) prepared by a registered Civil Engineer is to be submitted and approved. The applicant will be required to install approved trash treatment control devices and include these facilities in the SWQMP. Once the final SWQMP is approved;
14 of 38
a. Provide a pdf copy of an Operation & Maintenance (O&M) plan in accordance with Chapter 16.104 of the Poway Municipal Code. b. Property owner shall execute an approved Storm Water Management Facilities Maintenance Agreement accepting responsibility for all structural BMP maintenance, repair and replacement as outlined in the Operations December 16, 2025, Item #8
Resolution
No.
25-Page
8 and
Maintenance
plan
. The
operat
ion
and
maintenance
requirements
shall
be
binding
on
the
land
throughout
the
life
of
the
project
as
outlined
in
section

16.104
of
the
Poway
Municipal
Code.

31. The
property
is
located
within
the
Trash
Amendment
Area
. The
property
owner
must
identify
onsite
existing
storm
drain
inlets
and
install
approved
Trash
Control
Device(s)
from
the
following
list:
www
.poway
.org/DocumentCenterNiew/9394/Certified-Trash-F
ull-Capture­
Systems-August-2025
.

32. Grading
securities
shall
be
posted
with
the
City
prior
to
grading
plan
approval
per
section

16.46 .080
of
the
Poway
Municipal
Code.

A
minimum
cash
security
of
$2,000
is
required
in
all
instances.

33. The
applicant
shall
pay
the
storm
water
pollution
inspection
fee
according
to
the
latest
adopted
master
fee
schedule
.
34 .

Any
existing
and
proposed
private
or
public
easements,
or
easements
to
be
vacated
shall
be
depicted
on
the
grading
plans.

The
proposed
public
easement
dedications
shall
be
submitted
prior
to
grading
permit
issuance
.
35 .

Following
approval
of
the
grading
plans,
posting
of
securities
and
fees,
and
receipt
of
three
copies
of
the
approved
plans,
the
applicant
shall
attend
a
pre-construction
meeting
at
the
Department
of
Development
Services.

The
scheduling
request
shall
be
submitted
on
a
City
standard
form
found
at
www.poway.org/DocumentCenterNiew/1
0254/Preconstruction-Meeti
ng-Req
uest­
Fillable
?bid
Id=
along
with
three
copies
of
the
approved
grading
plans.

The
applicant's
action
plan
that
identifies
measures
to
be
implemented
during
construction
to
address
erosion,
sediment
and
pollution
control
will
be
discussed
.

Compliance
for
sediment
control
shall
be
provided
. as
directed
by
the
project
inspector.

36. Prior
to
start
of
any
work
within
a
City-held
easement
or
right-of
-way,
a
Right-of­
Way
Permit
shall
be
obtained
from
the
Engineering
Division
of
the
Development
Services
Department.

All
appropriate
fees
shall
be
paid
prior
to
permit
issuance
.
37 .

Construction
staking
is
to
be
inspected
by
the
Engineering
Inspector
prior
to
any
clearing,
grubbing
or
grading
. At
a
minimum,
all
protected
areas
as
shown
on
the
approved
grading
plans
are
to
be
staked
under
the
direction
of
a
licensed
land
surveyor
or
licensed
civil
engineer
and
delineated
with
lathe
and
ribbon.

As
applicable,
provide
two
copies
of
a
written
certification
, signed
and
sealed
in
accordance
with
the
Business
and
Professions
Code,
by
the
engineer
of
record
stating
that
all
protected
areas
have
been
staked
in
accordance
with
the
approved
plans.
38 .

If the
disposal
of
groundwater
is
necessary
du
ring
construction
, a
dewatering
plan
shall
be
submitted
for
review
and
approval.

Extracted
groundwater
should
be
discharged
to
surface
waters
under
the
current
general
National
Pollutant
Discharge
Elimination
System
(NPDES)
permit
adopted
by
the
California
Regional
Water
Quality
Control
Board
(RWQCB)
. Proof
of
coverage
under
this
permit
will
be
required
. To
protect
water
quality
in
the
San
Diego
area
, the
City
recognizes
15 of
38 December 16, 2025, Item #8
Resolution
No
. 25-Page
9 that
it
may
be
necessary
to
accept
discharges
of
extracted
groundwater
to
the
sewer
system.

Discharges
to
the
sewer
system
will
only
be
allowed
if
it
is
determined
that
discharge
of
this
wastewater
into
the
sewer
system
is
the
most
appropriate
and
prudent
disposal
alternative
and
when
sufficient
hydraulic
and
treatment
plant
capacity
is
available
to
allow
such
discharges
into
the
sewer
system
.

39. Easements
shall
be
dedicated
or
letters
of
permission
from
property
owners
and/or
easement
holders
shall
be
provided
for
any
proposed
work
within
properties
or
easements
not
owned
by
or
granted
to
the
applicant.

Prior
to
issuance
of
a
Building
Permit:

40. The
final
condo
map
shall
be
recorded
prior
to
sale
or
occupancy
of
any
unit,
whichever
comes
first.

41. The
site
shall
be
developed
in
accordance
with
the
approved
grading
plans
on
file
in
the
Development
Services
Department
and
the
conditions
contained
herein
.

Grading
shall
be
in
accordance
with
the
Uniform
Building
Code
, the
City
Grading
Ordinance
, the
approved
grading
plan
, the
approved
soils
report,
and
grading
practices
acceptable
to
the
City.

42. Erosion
control
shall
be
installed
and
maintained
by
the
developer
from
October
1 to
April

30. The
developer
shall
maintain
all
erosion
control
devices
throughout
their
intended
life.

43. Applicant
shall
obtain
a
Grading
Permit
and
complete
rough
grading
of
the
site
.

The
grading
shall
meet
the
approval
of
the
Engineering
Inspector
and
the
project's
geotechnical
engineer.

Following
completion
of
rough
grading
, please
submit
the
following
:
a.

Two
copies
of
certification
of
line
and
grade
for
the
lot,
prepared
by
the
civil
engineer
of
work.
b.

Two
copies
of
a soil
compaction
report
for
the
lot,
prepared
by
the
project's
geotechnical
engineer.
c.

The
certification
and
report
are
subject
to
review
and
approval
by
the
City.

44. Prior
to
start
of
any
work
within
a
City-held
easement
or
right-of-way,
a
Right-of­
Way
Permit
shall
be
obtained
from
the
Engineering
Division
of
the
Development
Services
Department.

All
appropriate
fees
shall
be
paid
prior
to
permit
issuance
.
45 .

The
applicant
shall
pay
all
applicable
development
impact
fees
according
to
the
latest
adopted
master
fee
schedule
at
time
of
permit
issuance
.

Prior
to
issuance
of
a
Certificate
of
Occupancy:

46. The
public
and
private
improvements
shall
be
installed
and
completed.

47. The
stormwater
facilities
shall
be
complete
and
operational
prior
to
occupancy.
48 .

The
applicant
shall
install
approved
trash
treatment
devices
per
the
Storm
Water
Trash
Facilities
Maintenance
Agreement
to
the
satisfaction
of
the
Engineering
Inspector.
16 of
38 December 16, 2025, Item #8
Resolution No. 25-

Page 10 ends

49. All applicable easement dedications, vacations and maintenance agreements are to be recorded prior to occupancy.

50. All existing and proposed utilities or extension of utilities required to serve the project shall be installed underground. No extension of overhead utilities shall be permitted.

51. All utility services shall be installed and completed by the property owner and inspected and approved by the Engineering Inspector. All new utility services shall be placed underground.

52. The drainage facilities, driveway, slope planting measures, and all utility services shall be installed, and completed by the property owner, and inspected by the Engineering Inspector for approval.

53. An adequate drainage system around the new building pad capable of handling and disposing all surface water shall be provided to the satisfaction of the Engineering Inspector.

54. The applicant shall repair, to the satisfaction of the City Engineer, any and all damages to public improvements caused by construction activity from this project.

55. After completion of all work, record drawings for both the grading and improvement plans, signed by the engineer of work, shall be submitted to Development Services for review prior to a request of occupancy, per Section 16.52.130B of the Grading Ordinance. Approval of all record drawings is required prior to issuance of occupancy and release of grading and improvement securities. Initial submittal of record drawings at least three weeks prior to a request for occupancy is recommended.
(Planning)

56. The Applicant is required to submit a TTM, receive approval, then subsequently record the FTM for a lot merger with the Project site (APN: 317-490-68-00), and the Fairfield Poway project site (APN: 317-491-01-00), within 365 days from the date of the Certificate of Occupancy for the Project's multi-family building. The Applicant is required to comply with the following:
a. Prior to the issuance of building or grading permits the Applicant shall provide the Development Services Department with a $30,000 Cash deposit, which will be returned if the FTM for the lot merger is successfully recorded within one year from the Certificate of Occupancy for the Project. b. Prior to the issuance of building or grading permits the applicant shall record a covenant for a lot tie between the two parcels (to hold property as one parcel) prepared to the satisfaction of the City Attorney. c. Prior to the Certificate of Occupancy for the Project, the applicant shall apply for the TIM for the lot consolidation.

57. Prior to the issuance of the Building Permit for the Project the applicant shall complete the following:
a. Install wayfinding signage and parking signage for commercial uses 17 of 38
December 16, 2025, Item #8
Resolution No. 25-

Page 11 ends

Submit plans for improvement of the Event Space described below. b. Complete and submit a conceptual layout design and internal rendering for a restaurant for the easternmost commercial space (adjacent to the plaza/park)
c. Complete and submit a conceptual design and rendering for the coffee­ type use at the eastern end of the westernmost retail space.

58. Prior to the issuance of the Certificate of Occupancy for the Project, a building permit shall be obtained, and the easternmost commercial restaurant space of the Fairfield Poway Restaurant Row shall be improved as a usable Event Space including but not limited to the following:
a. Concrete floor
b. Interior demising wall
c. Skim coat and paint for interior walls
d. Restroom
e. Lighting
f. Heating and ventilation
g. Outdoor lighting and gates

59. Prior to the issuance of the Certificate of Occupancy for the Project, the applicant shall obtain a Temporary Use Permit to host monthly events in the Event Space.

The applicant shall host monthly community events and shall make the space available for private and public events until the commercial tenant space is permanently leased. The applicant will provide a schedule of events to the City prior to the first of each month.
a. Until the restaurant row vacancies are filled with permanent tenants, the Applicant shall meet with the City staff monthly to share details of recruitment efforts with potential tenants, including incentive offers, lease term flexibility, and below market rents offered.
b. To secure the Event Space improvement and operation conditions of approval, $15,000 of the $30,000 cash deposit securing lot consolidation shall be held until one restaurant space is permanently leased.

60. In accordance with Mitigation Measure BIO-1 of the PRSP EIR, all construction­ related activities (including but not limited to mobilization and staging, clearing, grubbing, vegetation removal, fence installation, demolition and grading) should occur outside the avian nesting season (generally prior to February 1 to August 31 or according to local requirements), all suitable habitats located within the project's area of disturbance including staging and storage areas plus a 250-foot (passerines) and 1,000-foot (raptor nests) buffer around these areas shall be thoroughly surveyed, as feasible, for the presence of active nests by a qualified biologist no more than five days before commencement of any site disturbance activities and equipment mobilization. If project activities are delayed more than five days an additional nesting bird survey shall be performed. Active nesting is present if a bird is sitting in a nest, a nest has eggs or chicks in it, or adults are observed carrying food to the nest. The results of the surveys shall be documented. If it is determined that the birds are actively nesting within the survey area, Condition Number G.20 (Mitigation Measure BIO-2 of the PRSP EIR) below shall apply.
18 of 38
December 16, 2025, Item #8
Resolution No. 25-

Page 12 ends

61. In accordance with Mitigation Measure 810-2 of the PRSP EIR, if pre-construction nesting bird surveys result in the location of active nests, no site disturbance and mobilization of heavy equipment (including but not limited to equipment staging, fence installation, clearing, grubbing, vegetation removal, fence installation, demolition, and grading), shall take place within 250 feet of non-raptor nests and 1,000 feet of raptor nests, or as determined by a qualified biologist in consultation with the California Department of Fish and Wildlife, until the chicks have fledged.

Monitoring shall be required to ensure compliance with the M8TA and relevant California Fish and Game Code requirements. Monitoring dates and findings shall be documented.

62. In accordance with Mitigation Measure 810-3 of the PRSP EIR, prior to the removal of mature trees and existing buildings, a preconstruction survey for maternity (March 1 to August 1) or colony bat roosts (year-round) shall be conducted by a qualified biologist within seven days prior to activities that remove trees or structures. If an occupied maternity or colony roost is detected, CDFW shall be contacted about how to proceed. Typically, a buffer exclusion zone would be established around each occupied roost until bat activities have ceased. The size of the buffer would take into account:
a. Proximity and noise level of project activities.
b. Distance and amount of vegetation or screening between the roost and construction activities.
c. Species-specific needs, if known, such as sensitivity to disturbance. d. Due to restrictions of the California Health Department, direct contact by workers with any bat is not allowed. The qualified bat biologist shall be contacted immediately if a bat roost is discovered during project construction.

63. In accordance with Mitigation Measure CUT-4 of the PRSP EIR, a qualified professional archaeologist shall be retained who meets U.S. Secretary of the Interior's Professional Qualifications and Standards, to conduct an Archaeological Sensitivity Training for construction personnel prior to commencement of excavation activities. The training session shall be carried out by a cultural resource professional with expertise in archaeology who meets the U.S. Secretary of the Interior's Processional Qualifications and Standards. The training session would include a handout and focus on how to identify archaeological resources that may be encountered during earthmoving activities and the procedures to be followed in such an event, those duties of archaeological monitors, and, the general steps a qualified professional archaeologist shall follow in conducting a salvage investigation if one is necessary.

64. In accordance with Mitigation Measure CUT-5 of the PRSP EIR, if archaeological resources are encountered, ground-disturbing activities shall be ceased, and the treatment plan shall be implemented. In the event that archaeological resources are unearthed during ground-disturbing activities, ground-disturbing activities shall be halted or diverted away from the vicinity of the find so that the find can be evaluated. A buffer area of at least 50 feet shall be established around the find where construction activities would not be allowed to continue until a qualified archaeologist has examined the newly discovered artifact(s) and has evaluated the area of the find. Work should be allowed to continue outside of the buffer area.

All archaeological resources unearthed by project construction activities shall be 19 of 38
December 16, 2025, Item #8
Resolution
No.
25-
Page
13 evaluated
by
a qualified
professional
archaeologist,
who
meets
the
U.S.

Secretary
of
the
Interior's
Professional
Qualifications
and
Standards.

Should
the
newly
discovered
artifacts
be
determined
to
be
prehistoric,
Native
American
Tribes/individuals
shall
be
contacted
and
consulted,
and
Native
American
construction
monitoring
should
be
initiated.

The
developer
and
City
shall
coordinate
with
the
archaeologist
to
develop
an
appropriate
treatment
plan
for
the
resources
.

The
plan
may
include
implementation
of
the
archaeological
data
recovery
excavations
to
address
treatment
of
the
resource
along
with
subsequent
laboratory
processing
and
analysis
.

65. In
accordance
with
Mitigation
Measure
CUT-6
of
the
PRSP
EIR,
periodic
archaeological
resources
spot
checks
during
grading
and
earth-moving
activities
in
younger
alluvial
sediments
shall
be
conducted
.

A
qualified
professional
archaeologist
who
meets
the
U.S
.

Secretary
of
the
Interior's
Professional
Qualifications
and
standards
shall
be
retained
to
conduct periodic
archaeological
spot
checks
beginning
at
depths
below
two
feet
to
determine
if
construction
excavations
have
exposed
or
have
a
high
probability
of
exposing
archaeological
resources.

After
the
initial
archaeological
spot
check,
further
periodic
checks
would
be
conducted
at
the
discretion
of
the
qualified
archaeologist.

If the
qualified
archaeologist
determines
that
construction
excavations
have
exposed
or
have
a
high
probability
of
exposing
archaeological
artifacts,
construction
monitoring
for
archaeological
resources
would
be
required.

The
Applicant
shall
retain
a qualified
archaeological
monitor
who
would
work
under
the
guidance
and
direction
of
a
professional
archaeologist,
who
meets
the
qualifications
set
forth
by
the
U.S
.

Secretary
of
the
Interior's
Professional
Qualifications
and
Standards.

The
archaeological
monitor
shall
be
present
during
all
construction
excavations
(e.g.,
grading,
trenching,
or
clearing/grubbing)
into
non-fill
younger
Pleistocene
alluvial
sediments.

Multiple
earth-moving
construction
activities
may
require
multiple
archaeological
monitors.

The
frequency
of
monitoring
shall
be
based
on
the
rate
of
excavation
and
grading
activities,
proximity
to
known
archaeological
resources,
the
materials
being
excavated
(native
versus
artificial
fill
soils),
the
depth
of
excavation,
and
if
found,
the
abundance
and
type
of
archaeological
resources
encountered.

Full-time
monitoring
could
be
reduced
to
part-time
inspections
if
determined
adequate
by
the
project
archaeologist.

In
accordance
with
Mitigation
Measure
CUT-7
of
the
PRSP
EIR,
a
report
shall
be
prepared
upon
completion
of
monitoring
services
.

The
archaeological
monitor,
under
the
direction
of
a
qualified
professional
archaeologist
who
meets
the
U.S.

Secretary
of
the
Interior's
Professional
Qualifications
and
Standards,
shall
prepare
a
final
report
at
the
conclusion
of
archaeological
monitoring
.

The
report
shall
be
submitted
to
the
Applicant,
the
South
Coastal
Information
Center,
the
City,
and
representatives
of
other
appropriate
or
concerned
agencies
to
signify
the
satisfactory
completion
of
the
project
and
required
mitigation
measures
.

The
report
shall
include
a
description
of
resources
unearthed,
if any,
evaluation
of
the
resources
with
respect
to
the
California
Register
and
CEQA,
and
treatment
of
the
resources
.
66 .

In
accordance
with
Mitigation
Measure
CUT-8
of
the
PRSP
EIR,
the
Applicant
shall
retain
a
professional
paleontologist,
who
meets
the
qualifications
set
forth
by
the
Society
of
Vertebrate
Paleontology,
shall
conduct
a
Paleontological
Sensitivity
20 of
38 December 16, 2025, Item #8
Resolution No. 25-

Page 14 ends

Training for construction personnel prior to commencement of excavation activities. The training would include a handout and would focus on how to identify paleontological resources that may be encountered during earthmoving activities, and the procedures to be followed in such an event; the duties of paleontological monitors; notification and other procedures to follow upon discovery of resources; and, the general steps a qualified professional paleontologist would follow in conducting a salvage investigation if one is necessary.

67. In accordance with Mitigation Measure CUT-9 of the PRSP EIR, periodic paleontological spot checks during grading and earth-moving activities shall be conducted. The Applicant shall retain a professional paleontologist, who meets the qualifications set forth by the Society of Vertebrate Paleontology to conduct periodic Paleontological Spot Checks beginning at depths below six feet to determine if construction excavations have extended into older Pleistocene alluvial deposits. After the initial Paleontological Spot Check, further periodic checks would be conducted at the discretion of the qualified paleontologist. If the qualified paleontologist determines that construction excavations have extended into the Puente Formation or into older Pleistocene alluvial deposits, construction monitoring for Paleontological Resources would be required. The Applicant shall retain a qualified paleontological monitor, who would work under the guidance and direction of a professional paleontologist, who meets the qualifications set forth by the Society of Vertebrate Paleontology. The paleontological monitor shall be present during all construction excavations (e.g., grading, trenching, or clearing/grubbing) into older Pleistocene alluvial deposits. Multiple earth-moving construction activities may require multiple paleontological monitors. The frequency of monitoring shall be based on the rate of excavation and grading activities, proximity to known paleontological resources and/or unique geological features, the materials being excavated (native versus artificial fill soils), and the depth of excavation, and if found, the abundance and type of paleontological resources and/or unique geological features encountered. Full-time monitoring can be reduced to part-time inspections if determined adequate by the qualified professional paleontologist.

70. In accordance with Mitigation Measure CUT-10 of the PRSP EIR, if paleontological resources are encountered, ground-disturbing activities shall be ceased, and the treatment plan shall be implemented. In the event that paleontological resources and or unique geological features are unearthed during ground disturbing activities, ground-disturbing activities shall be halted or diverted away from the vicinity of the find so that the find can be evaluated. A buffer area of at least 50 feet shall be established around the find where construction activities shall not be allowed to continue until appropriate paleontological treatment plan has been approved by the Applicant and the City. Work shall be allowed to continue outside of the buffer area. The Applicant and City shall coordinate with a professional paleontologist, who meets the qualifications set forth by the Society of Vertebrate Paleontology, to develop an appropriate treatment plan for the resources.

Treatment may include implementation of paleontological salvage excavations to remove the resource along with subsequent laboratory processing and analysis or preservation in place. At the paleontologist's discretion, and to reduce construction delay, the grading and excavation contractor shall assist in removing rock samples for initial processing.
21 of 38
December 16, 2025, Item #8
Resolution
No.
25-
Page
15 71.

In
accordance
with
Mitigation
Measure
CUT-11
of
the
PRSP
EIR,
upon
completion
of
the
paleontological
monitoring
activities,
the
professional
paleontologist
shall
prepare
a
report
summarizing
the
results
of
the
monitoring
and
salvaging
efforts
,
the
methodology
used
in
these
efforts,
as
well
as
a
description
of
the
fossils
collected
and
their
significance
. The
report
shall
be
submitted
to
the
Applicant,
the
City,
San
Diego
Natural
History
Museum,
and
representatives
of
other
appropriate
or
concerned
agencies
to
signify
the
satisfactory
completion
of
the
project
and
required
mitigation
measures
.
72 .

A
Tree
Removal
Permit
shall
be
obtained
prior
to
the
removal
of
all
existing
trees
.

If
the
trees
are
proposed
to
be
removed
during
the
recognized
nesting
season
for
birds
(February
15 and
August
15),
a
nesting
bird
survey
shall
be
conducted
by
a
qualified
biologist
and
report
the
findings
in
writing
to
the
City
. Between
February
15 and
August
15,
removal
of
trees
containing
nests
shall
be
delayed
until
such
time
as
the
nest(s)
have
been
abandoned
unless
the
removal
can
be
completed
in
accordance
with
California
State
codes
and
the
Federal
Migratory
Bird
Treaty
Act
of 1918
.
73 .

All
crosswalks
and
driveway
entrances shall
feature
high-quality
materials
such
as
pavers
, cobblestone,
or
patterned
, stained
, and
scored
concrete
.

At
least
five
percent
of
the
total
area
of
any
surface
parking
lot
must
be
similar
high-quality
materials.

Special
colored
paving
treatments
shall
be
incorporated
at
strategic
locations
along
the
Town
Center
internal
street,
all
drive
aisle
crossings,
and
at
entry
driveways
.
7 4.

Grades
exceeding
12 percent
shall
be
concrete
with
deep
broom
finish
perpendicular
to
the
access
driveway.
75 .

Prior
to
the
issuance
of
a
building
permit,
landscape
and
irrigation
plans
shall
be
submitted
for
review
and
shall
be
approved
to
the
satisfaction
of
the
Director
of
Development
Services
.

The
landscape
and
irrigation
plans
shall
demonstrate
compliance
with
the
City
of
Poway
Landscape
and
Irrigation
Design
Manual,
Chapter

17.41 PMC
and
substantial
conformance
to
the
approved
conceptual
landscape
plans,
and
all
other
applicable
standards
and
ordinances
in
effect
at
the
time
of
landscape
and
irrigation
plan
check
submittal.

To
the
satisfaction
of
the
Director
of
Development
Services,
the
landscape
plans
shall
also
provide
the
following
:
22 of
38 a.

Calipers
, heights,
and
spreads
at
15-year
maturity
shall
be
specified
on
the
landscape
plan
and
shall
be
to
the
satisfaction
of
the
Development
Services
Director
.
b.

The
5-foot
proposed
landscape
strip
along
the
southerly
property
line
shall
include
at
a
minimum
every
10 feet
a
minimum
one
15-gallon
Strawberry
Tree,
Carolina
Laurel
Cherry,
Photonia
Fraseri,
and/or
similar
species
(screening
trees)
to
obscure
views
from
adjacent
residents
onto
the
project
and
vice
versa
to
the
satisfaction
of
the
Development
Services
Director.
c.

A
minimum
of
10 percent
of
the
net
lot
area
shall
be
landscaped.

Include
a
note
for
this
requirement
and
an
area
calculation
on
the
landscape
plan
.
d.

The
site
design
and
landscape
materials
should
be
low
maintenance
.
e.

The
landscaping
plan
shall
incorporate
a
minimum
one
24-inch
box
tree
for
every
30 feet
of
frontage
along
the
public
right-of-way.
f.

A
minimum
of
one
15-gallon
tree,
per
City
specification,
shall
be
provided
December 16, 2025, Item #8
Resolution No. 25-

Page 16 ends

for every three parking spaces. Tree wells may be used to satisfy the parking lot tree planting requirement. Said trees shall be located to provide shade cover for the vehicles where practical.
g. The ratio of 15-gallon trees to 24-inch boxed trees or larger shall be four to one (4:1).
h. Oaks proposed on-site are subject to tree preservation requirements. i. The plans shall include shrubs to provide screening of the parking areas as seen from adjacent public streets.
j. Special attention shall be given to provide landscaping that enhances the intersection corners.
k. The landscape and irrigation plan submittal are a separate submittal from other project plan check submittals and is made directly to the Planning Division. Contact the Planning Division for copies of applicable City standards, the landscape and irrigation plan submittal checklist and the plan review fee worksheet. Landscape and irrigation plan review fees are required and are the responsibility of the applicant. Any landscaped areas within the public right-of-way shall be permanently and fully maintained by the owner of the private property adjacent to the public right-of-way where the improvements are located to the satisfaction of the Director of Development Services.

75. The Project's parking lot shall have directional pavement and traffic signs as recommended by the Traffic Engineer.

76. Traffic signage including speed limits, parking restrictions, stop and yield signs etc. shall be shown on the grading plans.

77. A minimum 42-inch-high fence, with no greater than two-inch openings is required adjacent to drops greater than 30 inches.

78. All freestanding and retaining walls shall be constructed with decorative blocks or a finish consistent with the approved plans to the satisfaction of the Director of Development Services:
a. Any railing on top of a retaining wall that provides fall protection and all maintenance access gates in a freestanding wall must be constructed with decorative materials to the satisfaction of the Director of Development Services.

79. All utility connections shall be designed to coordinate with the architectural elements of the site so as not to be exposed except where necessary. Pad­ mounted transformers and/or meter box locations shall be included in the site plan with any appropriate screening treatment.

80. Commercial bicycle parking shall be provided at the rate of five percent of the commercial automobile parking requirement. Bicycle racks shall be located within 100 feet of a visitor entrance and readily visible to passers-by, preferably near building entrances and plazas.

81. The project shall feature ADA compliant ramps, stairways, and elevators. ADA access shall be provided to all project features, including the dog park, bus shelter, 23 of 38
December 16, 2025, Item #8
Resolution No. 25-

Page 17 ends

quasi-public and private open space, residential building entrances, and to the commercial components of the project. A separate ADA path of travel exhibit shall be submitted with the Building plans.

82. All architectural details shown on the approved plans stamped "Exhibit A" on file at the Development Services Department shall also be shown on the building plan check submittal. Any major modifications from the building and site design details not within substantial conformance to the approved plans will require a DR revision and City Council approval as determined by the Director of Development Services.

83. The building plans shall include details for all exterior lighting to demonstrate conformance with PMC Section 17.10.150(H); including, but not limited to, reflecting light downward, away from any road or street, and away from any adjoining residential development. Lighting shall be maintained in compliance with City standards by the applicant for the life of the project.

84. A photometric analysis shall be provided after lighting installations to restrict light trespass and limit glare onto the adjacent public roads and onto existing neighboring properties to the satisfaction of the Director of Development Service

85. The building plans shall include elevations and cross-sections that show all new roof-mounted appurtenances, including, but not limited to, air conditioning and vents, screened from view from adjacent properties, to the satisfaction of the Director of Development Services. Screening of utilities and mechanical equipment located on roofs is appropriate with architectural design elements such as the proposed Mansard Roof screen wall.

86. All residential units shall feature an interior bicycle rack area. If a unit has a garage, ceiling mounted bicycle parking sufficient for two bicycles shall be provided in the garage. Ceiling mounted storage racks, minimum 50 sf, shall be provided in each garage. Storage in corridors and assigned to units shall be consistent with the -approved plans stamped "Exhibit A" on file with the Development Services Department.

87. Exterior building materials and finishes shall reflect the approved elevations on the approved plans stamped "Exhibit A" on file with the Development Services Department and the conditions of approval, and shall be noted on the building plans, to the satisfaction of the Director of Development Services.

88. Demolition of existing structures shall include investigations for lead and asbestos with appropriate mitigations prepared by certified professionals.

89. In accordance with Mitigation Measure GHG-1, the installation of wood-burning devices such as fireplaces, stoves and heaters shall be prohibited.

90. Electrical charging stations shall be provided at the rate required by the California Green Code.

91. The applicant shall pay the affordable housing in-lieu fee in effect at time of permit issuance.
24 of 38
December 16, 2025, Item #8
Resolution
No.
25-
Page
18 92.

Ground
mounted
utility
equipment
shall
be
screened
.

93. The
building
plans
shall
show
all
trash
enclosures
. The
trash
enclosures
shall
be
adequately
sized
to
contain
the
following
waste
streams:
recyclables,
organic
waste,
and
trash.

The
trash
enclosures
shall
also
be
sized
to
allow
the
City's
exclusive
franchise
solid
waste
disposal
company
(EDCO)
to
adequately
access
the
bins
. The
applicant
shall
contact
EDCO
to
verify
locations
, correct
bin
sizes
,
and
trash
enclosure
size.

The
trash
enclosure
shall
sufficiently
screen
all
the
bins
and
be
cons
istent
with
the
design
of
the
development.

94. All
refuse
areas
shall
have
a
trash
enclosure
as
applicable
and
provide
for
recycling
and
compost
bins
(SB
1383)
. Refuse
conta
iners
for
residential
uses
shall
be
stored
outside
the
front
yard
setback
area
behind
fences
with
gated
access.
(Building) 95
.

The
development
shall
comply
with
the
current
addition
of
the
California
Building
Code,
California
Plumbing
Code
, California
Mechanical
Code
, California
Electrical
Code,
California
Residential
Code,
California
Fire
Code
, California
Energy
Code
and
California
Green
Code
at
time
of
submittal
to
the
Building
Division
.

All
development
shall
comply
with
state
structural
calculations
and
seismic
safety
requirements
.

96. Prior
to
issuance
of
a
building
permit
demonstrate
the
project
complies
with
the
provisions
of
the
California
Noise
Insulation
Standards
(CCR
Title
24)
. Units
located
in
an
area
of
noise
incompatibility
(exposed
to
60 decibels
or
more
, CNEL)
require
an
Acoustical
Analysis
Report,
as
prescribed
in
Section
II
D
of
the
Noise
Hazards
Element
be
prepared
demonstrating
that
interior
noise
levels
of
habitable
rooms
will
not
exceed
45 decibels
.

The
interior
floor/ceiling
and
party
wall
assemblies
for
multiple-family
dwelling,
whether
or
not
they
are
located
in
areas
of
noise
incompatibility
shall
provide
a
minimum
insulation
between
units
of
45 decibels
. Standard
care
and
practice
guidelines
for
building
construction
shall
include,
but
not
be
limited
to,
the
current
edition
of
the
American
Standards
for
Testing
Materials,
E-497,
standard
practice
for
installing
sound
-insulation
lightweight
partitions.
(Sheriffs
Crime
Prevention)

97. Upon
issuance
of
permits
for
grading
, the
applicant
shall
post
and
maintain
adequate
"no
trespassing
,"
signage
on
the
properties,
as
well
as
file
and
maintain
a
current
"Trespass
Arrest
Authorization
form"
with
the
Poway
Sheriff
Station,
in
order
to
allow
for
enforcement
of
unlawful
access.

During
active
construction,
all
work
locations
shall
be
adequately
secured
from
access.
25 of
38 a.

During
active
construction
,
all
work
locations
are
encouraged
to
add
security
cameras
to
maintain
safety
and
security
of
the
property
during
non­
working
hours
to
the
satisfaction
of
the
Sheriff's
Crime
Prevention
Officer
.

Construction
shall
maintain
an
active
list
of
all
tools
with
make,
model
and
serial
number
in
case
thefts
occur
after
hours
. Applicant
shall
also
consider
adding
engravings
to
declare
ownership
of
tools
or
other
materials.
b.

The
project
shall
be
constructed
according
to
Crime
Free
Multi-Housing
standards.

December 16, 2025, Item #8
(Fire)
Resolution
No
. 25-
Page
19 c.

The
project
shall
create
Neighborhood
Watch
and
a
Business
Watch
program.

98. Fire
Department
access
for
use
of
firefighting
equipment
shall
be
provided
to
the
immediate
job
construction
site
at
the
start
of
construction
and
maintained
at
all
times
until
construction
is
completed
. Access
to
each
phase
of
development
shall
be
to
the
satisfaction
of
the
City
Engineer
and
City
Fire
Marshal.

99. Prior
to
the
delivery
of
combustible
building
material
on
site,
the
approved
vehicle
access
for
firefighting
shall
be
installed,
satisfactorily
pass
all
required
tests
and
approved
by
the
City.

All
accesses
shall
be
provided
within
100-feet
of
all
fire
department
connections.

Use
of
temporary
vehicle
access
for
firefighting
shall
require
plan
submittal,
review
and
approval
by
the
City.
100.

Approved
fire
apparatus
access
roadways
shall
be
provided
for
every
facility,
building
or
portion
of
a
building
. The
fire
apparatus
access
roadways
shall
extend
to
within
150-feet
of
all
portions
of
the
project
and
all
portions
of
the
exterior
walls
of
the
first
story
of
all
buildings
as
measured
by
an
approved
route
around
the
exterior
of
the
building
or
facility
.
101.

The
project
shall
be
accessible
to
Fire
Department
apparatus
by
way
of
access
roads
shall
have
an
unobstructed,
improved
width
of
not
less
than
20 feet.

In
most
cases,
the
City
of
Poway
construction
standards
for
streets
(Chapter

12.20 PMC)
will
be
more
restrictive.

The
more
restrictive
standard
shall
apply.

Fire
apparatus
access
roads
shall
be
designed
and
maintained
to
support
the
imposed
loads
of
fire
apparatus
not
less
than
75,000
pounds
unless
authorized
by
the
FAHJ
and
shall
be
provided
with
an
approved
paved
surface
as
to
provide
all-weather
driving
capabilities
. A
paved
driving
surface
shall
mean
asphalt,
concrete,
or
permeable
paving
system.
102.

The
project
shall
be
accessible
to
Fire
Department
apparatus
by
way
of
access
roadways
with
all-weather
driving
surface
of
not
less
than
20-feet
of
unobstructed
width.

Vertical
overhead
clearance
shall
be
a
minimum
of
13 feet
6 inches.

Fire
apparatus
access
roads
shall
be
designed
and
maintained
to
support
the
imposed
loads
of
fire
apparatus
not
less
than
75,000
pounds
unless
authorized
by
the
FAHJ
and
shall
be
provided
with
an
approved
paved
surface
as
to
provide
all-weather
driving
capabilities.

A
paved
driving
surface
shall
mean
asphalt,
concrete,
or
permeable
paving
system.

This
20-foot
access
width
is
the
minimum
required
for
Fire
Department
emergency
access.

In
most
cases,
City
Engineering
standards
will
be
more
restricting.

The
more
restrictive
standard
shall
apply.
103.

The
turning
radius
of
a
fire
apparatus
access
road
shall
be
a
minimum
of
28-feet
as
measured
to
the
inside
edge
of
the
improvement
width
or
as
approved
by
the
fire
code
official.
104.

Fire
apparatus
access
roads,
including
all
private
drives,
shall
not
be
obstructed
in
any
manner,
including
the
parking
of
vehicles.

A
minimum
of
20-feet
unobstructed
access
is
required.

All
applicable
areas
shall
be
designated
as
"Fire
Lanes"
with
26 of
38 December 16, 2025, Item #8
appropriate signs and curb markings.

Resolution No. 25-

Page 20 ends

105. All dead-end fire access roads in excess of 150 feet in length shall be provided with approved provisions that allow emergency apparatus to turn around. 106. The gradient for a fire apparatus access roadway shall not exceed 20 percent.

Grades exceeding 15 percent (incline or decline) shall be constructed of Portland cement concrete (PCC), with a deep broom finish perpendicular to the direction of travel, or equivalent, to enhance traction. Grades exceeding 10 percent shall be constructed of asphalt or PCC. Permeable paver systems shall not be used for grades exceeding 10 percent. The fire code official may require additional mitigation measures where he or she deems appropriate.
107. The angle of departure and the angle of approach of a fire access roadway shall not exceed ?-degrees (12-percent) or as approved by the fire code official. 108. Approved signs or other approved notices shall be provided and maintained for fire apparatus access roads to identify such roads and prohibit the obstruction thereof or both.
109. A lighted directory map, meeting current fire department standards, shall be installed at each driveway entrance to multiple unit residential projects and mobile home parks, where the number of units in such project exceeds 15. 110. All gates or other structures or devices that could obstruct fire access roadways or otherwise hinder emergency operations are prohibited unless they meet the standards approved by the fire code official and receive Specific Plan approval. 111. All automatic gates across fire access roadways and driveways shall be equipped with approved, emergency, key-operated switches overriding all command functions and opening the gate(s). Gates accessing more than four residences or residential lots, or gates accessing hazardous institutional, educational or assembly occupancy group structures shall also be equipped with approved emergency traffic control-activating strobe light sensor(s), or other devices approved by the fire code official, which will activate the gate on the approach of emergency apparatus with a battery backup or manual-mechanical disconnect in case of power failure. In the event of a power failure, the gate shall be automatically transferred to a fail-safe mode allowing the gate to be manually pushed open without the use of special knowledge or equipment. All automatic gates must meet fire department policies deemed necessary by the fire code official for rapid, reliable access.
112. Each building shall display the approved numbers and/or addresses in a location plainly visible and legible from the street or roadway fronting the property from either direction of approach. Said numbers shall contrast with their background and a size approved by the City. Each building address shall also be displayed on the roof in a manner satisfactory to the Fire Marshal, and meeting Sheriff Department-ASTREA criteria.
113. Prior to the delivery of combustible building material on site, the approved water service to all fire hydrants shall be connected to the public water supply, 27 of 38
December 16, 2025, Item #8
Resolution
No.
25-
Page
21 satisfactorily
pass
all
required
tests
and
be
approved
by
the
City
.
114.

The
entire
water
system
for
the
project
shall
be
looped.

The
addition
of
on-site
fire
hydrants
is
required.

Fire
hydrants
shall
be
located
within
400
feet
of
any
portion
of
the
facility
or
buildings,
with
spacing
between
hydrants
not
to
exceed
400
feet,
as
measured
by
an
approved
route
of
travel
that
a
fire
engine
would
travel.

The
Fire
Marshal
shall
approve
the
location
of
all
fire
hydrants
.
115.

A
water
systems
analysis
will
be
required
to
establish
available
fire
flow.

The
required
fire
flow
shall
be
according
to
Appendix
B
of
the
2019
California
Fire
Code
and
approved
by
the
City.

The
water
supply
system
will
require
approved
improvements
to
include
the
addition
of
water
mains
and
fire
hydrants
as
determined
and
approved
by
the
Fire
Department
and
City
Engineer.
116.

Water
main
sizes
and
fire
hydrant
locations
are
conceptual
only
and
shall
be
reviewed
and
approved
by
a
separate
plan
submittal
to
the
City
of
Poway
.

Reduced
Pressure
Detector
Assemblies
(RPDA)
shall
be
used
with
the
private
fire
service
water
main
.

All
fire
hydrants
and
backflow
preventer
devices
(RPDA)
installed
in
the
City
of
Poway
shall
be
per
the
City
of
Poway
approved
material
list
and
current
Supplemental
Engineering
Standards.
117.

Fire
protection
systems
and
details
are
conceptual
only
and
shall
be
reviewed
and
approved
by
separate
plan
submittal
to
the
fire
department.

The
fire
department
will
review
and
inspect
the
backflow
preventer
devices
(RPDA),
fire
sprinkler
underground
service,
fire
sprinkler
systems,
fire
alarm
systems,
kitchen
hood
and
duct
systems,
and
any
alternative
fire
suppression
systems
. The
City
of
Poway,
Development
Services
Division
will
review
and
inspect
the
private
fire
service
water
main
and
fire
hydrants
.
118.

All
buildings
are
required
to
be
equipped
with
an
approved
fire
sprinkler
system
according
to
PMC
requirements.

The
fire
sprinkler
system
shall
be
designed
to
meet
minimum
design
density
at
the
roof
per
NFPA
13 requirements
for
all
non­
residential
areas.

The
fire
sprinkler
system
installed
in
the
residential
occupancies
shall
meet
NFPA
13R
requirements.

All
systems
are
required
to
be
monitored
by
a
U.L.
listed
central
station
monitoring
company.

Backflow
valve
assemblies
with
tamper
switches
shall
be
monitored.

The
City
Fire
Marshal
shall
approve
the
location
of
these
fire
protection
devices
prior
to
installation.

A
separate
submittal,
with
applicable
fees,
for
the
underground
fire
service
lateral
connected
to
each
separate
fire
sprinkler
riser
system
is
required.

A
separate
plan
submittal,
with
applicable
fees,
for
each,
separate
building's
fire
sprinkler
system
design
is
required.

Separate
fees
for
plan
check
and
inspection
services
will
be
charged
by
the
Fire
Department
upon
submittal.
119.

Fire
sprinkler
riser(s)
shall
be
located
inside
an
enclosed closet
with
an
exterior
access
man
door
.

Door
shall
be
labeled
with
a
sign
indicating
"Fire
Sprinkler
Riser
."
120.

A
metal
sign
with
raised
letters
at
least
one-inch
(25
mm)
in
size
shall
be
mounted
on
all
fire
department
connections
serving
automatic
sprinklers,
standpipes
or
fire
pump
connections.

Such
signs
shall
read:

AUTOMATIC

SPRINKLERS
or
28 of
38 December 16, 2025, Item #8
Resolution No. 25-

Page 22 ends
← All documents from this meeting