Capital Improvement Program
Project Updates
March 3, 2026
Jonathan Schauble, PE
Principal Civil Engineer
Purpose:
The purpose of the Capital Improvement Program
(CIP) is to plan and implement those Capital
Improvements that the City Council determines
to be most important for maintaining the City’s
infrastructure and long-term quality of life for the
community of Poway.
Capital Improvement Program
Streets – 9 Projects
Drainage – 4 Projects
Public Facilities – 43 Projects
Water – 13 Projects
Sewer – 9 Projects
78 Total Projects – Total Funding $68.9 M
Capital Improvement Program
Streets
Annual Street Maintenance
Annual Street Overlay
Annual Citywide Striping
Traffic Signal Controller Upgrades
ADA Barrier Removal – Buckley Street
Overhead Flashing Beacon at Fire Station 2
Agency Current PCI Score
Carlsbad 79
Poway 78
Chula Vista 74
San Marcos 71
Solana Beach 71
Encinitas 70
County of SD 69
Santee 69
Del Mar 68
Vista 68
San Diego 65
Escondido 65
National City 63
Oceanside 61
Lemon Grove 58
Traffic Signal Controller Upgrades
ADA Barrier Removal – Buckley Street
Before
After
ADA Barrier Removal – Buckley Street
Before
After
Overhead Flashing Beacon at Fire Station 2
Drainage
Annual Channel Rehabilitation
Community Park Ribbon Drain - Rattlesnake
Creek
Annual Trash Capture Program
Annual Corrugated Metal Pipe Repair/Replace
Annual Channel Rehabilitation Project
Community Park Ribbon Drain Project
Rattlesnake Creek concrete ribbon drain
• 550 linear feet
• constructed in the late 1970s
• deteriorated beyond repair
Recommended Approach
Remove broken concrete ribbon gutter
Install 3 drop structures to manage water velocity and reduce erosion Stabilize creek banks with native vegetation and rocks
Public Facilities
Community Park Restroom
Workplace Safety Improvements
Community Park Signage
Fire Station 2 Gym Structure
Community Park Sidewalks
Pool Bumper Replacement and Ladder
Pool Media Filter and Rehabilitation
Pickleball Courts
Zero Emissions Vehicle Charging Infrastructure
Poway Center for the Performing Arts (PCPA) Maintenance and Improvements
Community Park Restroom Project
Pickleball Courts
Poway Center for Performing Arts
Water
Annual Water Valve Replacement
Water Pump Station 8 Motor Control Center Upgrades
Water Treatment Plant Chemical Tank Rehabilitation
Water Infrastructure Improvement Program (multiple projects) Water Master Plan Update and Implementation
Annual Water Valve Replacement
Sewer
Butterfield Trail Sewer Upsize
Annual Sewer Manhole Rehabilitation
Annual Sewer Line Repair/Replace
Sewer Master Plan and Implementation
Butterfield Trail Sewer
Capital Improvement Program
Project Updates
This is an informational item and there is no recommended action.