Capital Improvement Program
Project Updates
March 3, 2026
Jonathan Schauble, PE
Principal Civil Engineer
Purpose:

The purpose of the Capital Improvement Program
(CIP) is to plan and implement those Capital
Improvements that the City Council determines
to be most important for maintaining the City’s
infrastructure and long-term quality of life for the
community of Poway.

Capital Improvement Program
Streets – 9 Projects
Drainage – 4 Projects
Public Facilities – 43 Projects
Water – 13 Projects
Sewer – 9 Projects
78 Total Projects – Total Funding $68.9 M
Capital Improvement Program
Streets
 Annual Street Maintenance
 Annual Street Overlay
 Annual Citywide Striping
 Traffic Signal Controller Upgrades
 ADA Barrier Removal – Buckley Street
 Overhead Flashing Beacon at Fire Station 2

Agency Current PCI Score
Carlsbad 79
Poway 78
Chula Vista 74
San Marcos 71
Solana Beach 71
Encinitas 70
County of SD 69
Santee 69
Del Mar 68
Vista 68
San Diego 65
Escondido 65
National City 63
Oceanside 61
Lemon Grove 58
Traffic Signal Controller Upgrades

ADA Barrier Removal – Buckley Street
Before
After
ADA Barrier Removal – Buckley Street
Before
After

Overhead Flashing Beacon at Fire Station 2

Drainage
 Annual Channel Rehabilitation
 Community Park Ribbon Drain - Rattlesnake
Creek
 Annual Trash Capture Program
 Annual Corrugated Metal Pipe Repair/Replace

Annual Channel Rehabilitation Project

Community Park Ribbon Drain Project
Rattlesnake Creek concrete ribbon drain
• 550 linear feet
• constructed in the late 1970s
• deteriorated beyond repair

Recommended Approach
 Remove broken concrete ribbon gutter
 Install 3 drop structures to manage water velocity and reduce erosion  Stabilize creek banks with native vegetation and rocks

Public Facilities
 Community Park Restroom
 Workplace Safety Improvements
 Community Park Signage
 Fire Station 2 Gym Structure
 Community Park Sidewalks
 Pool Bumper Replacement and Ladder
 Pool Media Filter and Rehabilitation
 Pickleball Courts
 Zero Emissions Vehicle Charging Infrastructure
 Poway Center for the Performing Arts (PCPA) Maintenance and Improvements
Community Park Restroom Project

Pickleball Courts

Poway Center for Performing Arts
Water
 Annual Water Valve Replacement
 Water Pump Station 8 Motor Control Center Upgrades
 Water Treatment Plant Chemical Tank Rehabilitation
 Water Infrastructure Improvement Program (multiple projects)  Water Master Plan Update and Implementation
Annual Water Valve Replacement

Sewer
 Butterfield Trail Sewer Upsize
 Annual Sewer Manhole Rehabilitation
 Annual Sewer Line Repair/Replace
 Sewer Master Plan and Implementation
Butterfield Trail Sewer

Capital Improvement Program
Project Updates
This is an informational item and there is no recommended action.