5.2 Paleontological Record Search
On September 14, 2023, APRMI requested a paleontological resource records search from the Western Science Center (WSC) in Hemet, California, to identify any known paleontological resources on or near the Project site.
5.3 Cultural Records Search
On September 14, 2023, APRMI requested a cultural resource records search from the Eastern Information Center (EIC) in Riverside, California to identify any known cultural resources on or near the Project site. In accordance with Assembly Bi11 52, APRMI also requested a sacred lands file 626
and Native American contact list request with Native American Heritage Commission (NAHC) in West Sacramento, California on September 14, 2023.
5.4 Field Reconnaissance
On September 28, 2023, Ms. Robin Turner, Mr. Sam Parekh, and Mr. Skyland Rice conducted a field reconnaissance of the Project area to evaluate the presence of any archaeological or paleontological resources to determine if the development of the Project might have significant direct or indirect adverse impacts on such resources. The survey began near the southeastern most boundary of the Project area on Ginger Rogers Road and towards the northeastern boundary of the project area for further evaluation. Pedestrian survey methods were conducted on undeveloped areas with clear brush access and high ground visibility. The Project area was surveyed in transects approximately 10 feet (3 m) apart towards an east direction. Vegetation, topography, and fauna observations were photographed and noted. All photos, and field notes are stored in the APRMI office.
6.0 RESULTS OF RECORDS SEARCHES
6.1 Paleontological Resources Records Check
The results of the paleontological resources records search, conducted by Collections Manager Brittney Stoneburg of the Western Science Center (see Appendix A), states that there are no known vertebrate fossil localities within one mile of the Project area. The geologic unit underlying the Project area consists of relatively modern loose fine sand dating to the Holocene epoch, and such sedimentary units are unlikely to contain fossils. However, if excavation disturbs deeper sedimentary units dating to the earliest Holocene or Pleistocene epochs, there would be high paleontological sensitivity.
6.2 Cultural Resources Records Search Results
Results of the cultural records search were received on November 27, 2023. These results are discussed in full detail below (see Sections 6.2.1-3) and referenced as catalog numbers assigned by the EIC. National, State, and local designation criterion requirements may be viewed in 2.0 Regulatory Setting section. The results provided by the EIC include primary records such as Department of Parks and Recreation (DPR) forms, assessment reports, and maps. Letter request and results can be viewed in Appendix B.
6.2.1 Prehistoric Sites and Isolate(s)
Four prehistoric sites and one prehistoric isolate have been recorded with primary record forms within a 1 -mile radius of the Project site. Of particular note are the two cremations, which indicate a higher possibility for the discovery of human remains during ground -disturbing activities. Multiple other prehistoric isolates were recorded by survey reports provided to APRMI by the EIC (see Section 6.2.3).
627
Table 2. Evaluated Prehistoric Sites and Isolates in Proiect Area or 1 -Mile Radius Primary
Number
Resource
Type
Description
Recorder(s) and
Year(s)
NRHP/CRHR
Status
Location
33-17007
Site
Two metates, two
handstones
Beth Padon, Keith
Hamm, Doug
McIntosh, 2007
Not Evaluated
Within 1-
mile radius
33-17009
Site
Cremation
Beth Padon, Keith
Hamm, Doug
McIntosh, 2007
Not Evaluated
Within 1 -
mile radius
33-17010
Site
Cremations and stone
artifacts
Beth Padon, Keith
Hamm, Doug
McIntosh, 2007
Not Evaluated
Within 1 -
mile radius
33-17011
Site
Temporary processing
site, 3-4 stone tools
Beth Padon, Keith
Hamm, Doug
McIntosh, 2007
Not Evaluated
Within 1 -
mile radius
33-17012
Isolate
Pottery sherd
Beth Padon, Keith
Hamm, Doug
McIntosh, 2007
Not Evaluated
Within 1 -
mile radius
6.2.2 Historic Sites and Isolate(s)
Six historic sites and four historic isolates have been recorded with primary record forms within a 1 - mile radius of the Project site. These primarily consist of historic refuse dating to late 1800s to early 1900s. As the field survey discovered, historic refuse is present on the Project property.
Table 3. Evaluated Historic Sites and Isolates in Project Area or 1 -Mile Radius Primary
Number
Resource
Type
Description
Recorder(s) and
Year(s)
NRHP/CRHR
Status
Location
33-003440
Site
Remains of railroad
siding station and
historic refuse
R.M. Apple, T.
Wahoff, K.
Norwood, 1988;
Brooke Arkush,
1990; S. Ashkar, E.
Prendergast, 1999;
Daniel Ballester,
2017
Not Evaluated
Within 1 -
mile radius
33-009498
Site
Railroad line
S. Ashkar, 1999;
Christeen
Taniguchi, 2005;
S. Wilson, K.
Chimel, 2009;
Scott Kremkau,
2012; T. Baurley,
J.M. Sanka, 2015;
Carrie Chasteen,
2003; Daneil
Leonard, 2016; P.
Moloney, R. Elder,
W. Blodgett, 2017
Not Evaluated
Within 1-
mile radius
628
33-009748
Site
Road and historic refuse
Beth Padon, 2007;
J. Underwood,
2004; David
Ferraro, 2000
Not Evaluated
Within 1-
mile radius
33-10953
Isolate
Two historic cans
T. Wahoff, J.
Dellert, S. Diaz, B.
Fitzsimmons, 2000
Not Evaluated
Within 1-
mile radius
33-10954
Isolate
Historic can
T. Wahoff, J.
Dellert, S. Diaz, B.
Fitzsimmons, 2000
Not Evaluated
Within 1-
mile radius
33-10955
Isolate
Historic can
T. Wahoff, J.
Dellert, S. Diaz, B.
Fitzsimmons, 2000
Not Evaluated
Within 1-
mile radius
33-10956
Isolate
Historic can
T. Wahoff, J.
Dellert, S. Diaz, B.
Fitzsimmons, 2000
Not Evaluated
Within 1-
mile radius
33-17005
Site
Burnt slag and charcoal,
metal pieces
Beth Padon, Keith
Hamm, Doug
McIntosh, 2007
Not Evaluated
Within 1 -
mile radius
33-017008
Site
Remains of a shed
Beth Padon, Keith
Hamm, Doug
McIntosh, 2007;
Daniel Ballester,
2017
Not Evaluated
Within 1 -
mile radius
33-26824
Site
Historic refuse
Daniel Ballester,
Ben Kerridge,
2017
Not Evaluated
Within 1 -
mile radius
6.2.3 Previous Cultural Reports and Studies
27 previous cultural reports have been conducted within a 1 -mile radius. One survey recorded prehistoric isolates not reported elsewhere.
Table 4. List of EIC Cultural Re • orts and Studies Identified Within a 1/2 Mile Radius Report Author(s) Year Title
Number
Affiliation
Location Artifacts
Found
RI -1122 Christopher
Drover
1981
Environmental Impact
Evaluation: Archaeological
Assessment of the
Proposed Extensions of
Monterey and 34th Avenues
Near Thousand Palms,
California
Riverside
County Road
Department
Within a
1 -mile
radius
None
RI -1271
James
Swenson
1981
Environmental Impact
Evaluation: An
Archaeological Assessment
of a Portion of the N 1/2 of
Section 29, T4S R6E,
SBBM, Coachella Valley,
Riverside County,
Archaeological
Research Unit
University of
California
Riverside
Within a
1 -mile
radius
None
629
California
RI -18 71
Beth Padon
1984
Archaeological Resource
Assessment 130 -Acre
Parcel Along Bob Hope
Drive Riverside County,
California
LSA, Inc.
Within a
1 -mile
radius
None
RI -2350
Rebecca
McCorkle
Apple and
Jan Wooley
1988
MCI Rialto to El Paso
Fiber Optics Project
Intensive Cultural
Resource Survey San
Bernardino and Riverside
Counties, California
Dames &
Moore
Within a
1 -mile
radius
Historic
site (33 -
003440)
RI -2765
Brooke
Arkush
1990
Environmental Impact
Evaluation: An
Archaeological Assessment
of the Proposed Mid-
Valley Stormwater
Channel Located in the
Coachella Valley of
Central Riverside County,
California
Archaeological
Research Unit
University of
California
Riverside
Within a
1 -mile
radius
Historic
site (33 -
003440)
RI -3284
John Torres,
Joan
Schneider,
Bruce Love
1991
Cultural Resources
Assessment Tentative Tract
26763 (APN 618-540-014,
-015) Thousand Palms
Area of Riverside County,
California
Archaeological
Research Unit
University of
California
Riverside
Within a
1 -mile
radius
None
RI -4117
Roger
Mason,
Philippe
Lapin, Brant
Brechbiel
1998
Cultural Resources
Records Search and Survey
Report for a Pacific Bell
Mobile Services
Telecommunications
Facility: CM 204-02 in the
City of Rancho Mirage,
California
Chambers
Group, Inc.
Within a
1 -mile
radius
None
RI -4547
Joan Brown
2001
A Cultural Resources
Reconnaissance for the
Widening of Bob Hope and
Dinah Shore Drives,
Located in Riverside
County, California
RMW Paleo
Associates,
Inc.
Within a
1 -mile
radius
None
R1-5329
Adrianna
Jackson
2001
Records Search Results for
Sprint PCS Facility
RV35XC091T (Miss Flo
Site), Rancho Mirage,
Riverside County,
California
Michael
Brandman
Associates
Within a
1 -mile
radius
None
RI -5374
Bruce Love,
Bai "Tom"
Tang,
Michael
2001
Identification and
Evaluation of Historic
Properties Relocation of
Five Outdoor Advertising
CRM Tech
Within a
1 -mile
radius
None
630
Hogan,
Daniel
Ballester
Signboards on Bob Hope
Drive, City of Rancho
Mirage, Riverside County,
California
RI -6372
Bai Tang,
Michael
Hogan,
Matthew
Wetherbee,
Daniel
Ballester,
Laura
Hensley
Shaker
2005
Historical/Archaeological
Resources Survey Report
Annenberg Center Project,
City of Rancho Mirage,
Riverside County,
California
CRM Tech
Within a
1 -mile
radius
None
RI -6854
Joan Brown
2000
A Cultural Resources
Reconnaissance for the
Widening of Bob Hope
Drive, Located in Riverside
County, California
RMW Paleo
Associates,
Inc.
Within a
1 -mile
radius
None
RI -7004
Tanya
Wahoff and
Rebecca
Apple
2001
Cultural Resource Survey
for the Proposed Golden
Ridge Resort and Spa
Project Riverside County,
California
EDAW, Inc.
Within a
1 -mile
radius
Multiple
previously
recorded
historic
sites and
isolates
RI -7304
Wayne
Bonner
2006
Cultural Resource Records
Search and Site Visit
Results for Sprint Nextel
Telecommunications
Facility Candidate
CA5319B (U.U.), 72425
Via Vail, Rancho Mirage,
Riverside County,
California
Michael
Brandman
Associates
Within a
1 -mile
radius
None
RI-
11067
Bai "Tom"
Tang,
Michael
Hogan
2017
Phase I
Historical/Archaeological
Resources Survey Key
Largo Project, Assessor's
Parcel Nos. 685-010-004
and -005, City of Palm
Desert, Riverside County,
California
CRM Tech
Within a
1 -mile
radius
None
RI -7720
Beth Padon
2007
Cultural Resources
Assessment for the Section
19 Specific Plan Area (268
Acres) City of Rancho
Mirage, Riverside County,
California
Discovery
Works, Inc.
Within a
1 -mile
radius
Multiple
previously
recorded
prehistoric
sites
RI -7756
Joan George
2008
Phase -I Cultural Resources
Survey, Well 4615-1
Project, Rancho Mirage,
Applied
EarthWorks,
Inc.
Within a
1 -mile
radius
None
631
California
RI -9016
Bai "Tom"
Tang
2013
Historic Property Survey
Report
CRM Tech
Within a
1 -mile
radius
Multiple
historic
properties
RI -9366
Bai "Tom"
Tang,
Michael
Hogan
2015
Phase I
Historical/Archaeological
Resources Survey, Rancho
Mirage Dog Park Project,
City of Rancho Mirage,
California
CRM Tech
Within a
1 -mile
radius
None
RI -9382
Bai "Tom"
Tang
2015
Update to
Historical/Archaeological
Resources Survey
Sunnylands Expansion
Project, APN 674-610-005,
City of Rancho Mirage,
Riverside County,
California
CRM Tech
Within a
1 -mile
radius
None
RI -9870
Bai "Tom"
Tang,
Michael
Hogan
2016
Phase I
Historical/Archaeological
Resources Survey,
Assessor's Parcel Numbers
694-130-016 and -021,
City of Palm Desert,
Riverside County,
California
CRM Tech
Within a
1 -mile
radius
None
RI -9874
Bai "Tom"
Tang,
Michael
Hogan
2016
Phase I
Historical/Archaeological
Resources Survey
Monterey Medical Center
Project, Tentative Tract
Map No. 37003, City of
Rancho Mirage, Riverside
County, California
CRM Tech
Within a
1 -mile
radius
None
RI-
10248
Curt Duke
2016
Historic Property Survey
Report, Rancho Mirage
Resignalization Project,
Highway 111/Bob Hope
Drive, Country Club Drive
Duke Cultural
Resources
Management
Within a
1 -mile
radius
None
RI-
10249
Nicolas
Hearth
2017
Archaeological Survey
Report, Rancho Mirage
Resignalization Project,
Highway 111/Bob Hope
Drive/Country Club Drive
Duke Cultural
Resources
Management
Within a
1 -mile
radius
Multiple
prehistoric
sites — not
within
radius
RI-
10299
Bai "Tom"
Tang,
Michael
Hogan
2015
Identification and
Evaluation of Historic
Properties, Chromium -6
Water Treatment Facilities
Project, Coachella Valley,
Riverside County,
California
CRM Tech
Within a
1 -mile
radius
Multiple
historic
sites
632
RI-
10550
Bai "Tom"
Tang,
Michael
Hogan, Terri
Jacqueman
2018
Attachment B
Archaeological Survey
Report/Historical
Resources Evaluation
Report, Congestion
Mitigation and Sand Fence
Project Ramon Road and
Dinah Shore Drive
CRM Tech
Within a
1 -mile
radius
None
RI-
Michael
2018
Attachment E Post -Review
CRM Tech
Within a
Multiple
10551
Hogan, Terri
Discovery and Monitoring
1 -mile
prehistoric
Jacqueman
Plan, Congestion
radius
isolates
Mitigation and Sand Fence
Project, Ramon Road and
Dinah Shore Drive
6.3 Archival Research
Resources at the libraries of University of California, Los Angeles, the University of Maryland, College Park, and the National Geographic Database were consulted by APRMI staff. A building is recorded as standing on the Project site on the 1958 USGS Topographic map, which likely represents the single-family home still standing on Project site today. ..
_—
-`
95S
`
t,
19©4
MED
30 0
30 11
4 I
1 Figure 5. Historic topographic maps from 1904 to 1958 (NGMDB). 633
97 Project Are
SCALE 1:24 000
7 I- 7
1000 0 1000 2000 3000 4000
'004
1 5
Figure 6. Aerial survey photo from 1975 (USGS).
634
201E
c 2021
VIA VA L
VIA vary
a,
:
q
VICTORY DR
YfC7ORY 8R
I.
6 P N G,
R O S ER S RAP
1 'Z
t9
,IO NGER
4 ROGErt
R
4i
N
GINGER•ROGERS
R
4 S
z
N.
0 VIA FCOREMCIA
nr
a'—
I
I
cif �.
�--
'a
'C'Ffy.
8 U C+Ylfy
x-,
I
7 It -
--
VL4 ; ARTA —
4 VIA MARIA
IF I
�!�
I
`fSSI CIA
E
r
(( fl
Figure 7. Topographic maps from 2012 to 2021 (NGMDB).
7.0 RESULTS OF FIELD RECONNAISSANCE
The field reconnaissance has determined the area to be relatively flat terrain with sparse vegetation and trees. The Project area was accessible and observable, excepting the area surrounding the existing single-family home. Project site ground surface was primarily loose fine sand, which has been blown by prevailing winds over the older alluvial gravel and sand, although in areas around the single-family home a concrete pad and mulch were observed, and hay was observed in the south- east corner (see Figure 5). Evidence that the Project area has also previously been used as an illegal dumping site was observed during the field reconnaissance. It is possible that some of the material possesses historic informational value. No known paleontological sites were located during the field reconnaissance process.
635
Figure S. View of Site facing north from the south-east corner.
Figure 9. View of Site facing northwest from the south-east corner. 636
Figure 10. View of site facing west from the south-east corner.
Figure 11. View of north-west corner of site facing north. 637
Figure 12. Potentially historic machine parts observed in the south -center of the site.
Figure 13. Potentially historic oil or gas canister observed in the south -center of the site. 638
8.0 NATIVE AMERICAN CONTACT
APRMI staff requested a Sacred Lands File Search and a Native American Contacts list for the Project from the Native American Heritage Commission (NAHC) on September 14, 2023. The NAHC's search of the Sacred Lands Files, received on November 15, 2023, provided APRMI with a Native American Contacts list. APRMI contacted the tribes, individuals, and organizations listed by phone on November 17th to ensure that the mailing information is correct and to let them know that an informational package regarding the Project, including a Project description, was being sent to them by mail. The Project informational package along with an accompanying letter was sent to them by regular mail, on November 22, 2023. Any written responses to APRMI's outreach can be viewed in Appendix C.
On November 20, 2023, Director of Historic Preservation Patricia Garcia for the Agua Caliente Band of Cahuilla Indians, responded to APRMI through email and telephonic communication and stated that the proposed Project falls within a medium to high sensitivity area due to the previous discovery of Native American burials and cremations just to the north of the Project.
On December 5, 2023, Cultural Resources Analyst Xitlaly Madrigal of the Agua Caliente Band of Cahuilla Indians requested in an email communication to APRMI that a cultural resources inventory of the Project area by qualified archaeologist prior to any construction, a copy of any cultural resource documentation generated in connection to this project, a copy of the Information Center records search requested by APRMI, and the presence of an archaeologist and an Agua Caliente- approved Native American Cultural Resource Monitor during any ground -disturbing activities.
A full list of communications from APRMI to Native American tribes can be seen in Table 5.
Table 5. APRMI Communication with Native Americans
Personal Contact
Tribal Affiliation
Communication from
APRMI
Responses
Patricia Garcia
Agua Caliente Band of
Cahuilla Indians
Physical letter,
Telephone
Telephone, email
Xitaly Madrigal
Agua Caliente Band of
Cahuilla Indians
None — Letter
forwarded by Patricia
Garcia
Email letter
Amanda Vance
Augustine Band of
Cahuilla Mission Indians
Physical letter,
Telephone
No response
Doug Welmas
Cabazon Band of
Mission Indians
Physical letter,
Telephone
No response
BobbyRay Esaprza
Cahuilla Band of Indians
Physical letter,
Telephone
No response
Anthony Madrigal
Cahuilla Band of Indians
Physical letter,
Telephone
No response
Daniel Salgado
Cahuilla Band of Indians
Physical letter,
Telephone
No response
Ray Chapparosa
Quechan Tribe of the
Fort Yuma Reservation
Physical letter,
Telephone
No response
Robert Martin
Morongo Band of
Mission Indians
Physical letter,
Telephone
No response
Ann Brierty
Morongo Band of
Physical letter,
No response
639
Mission Indians
Telephone
Jordan Joaquin
Quechan Tribe of the
Fort Yuma Reservation
Physical letter,
Telephone
No response
Jill McCormick
Quechan Tribe of the
Fort Yuma Reservation
Physical letter,
Telephone
No response
Manfred Scott
Quechan Tribe of the
Fort Yuma Reservation
Physical letter,
Telephone
No response
John Gomez
Ramona Band of
Cahuilla
Physical letter,
Telephone
No response
Lovina Redner
Santa Rosa Band of
Cahuilla Indians
Physical letter,
Telephone, Email
No response
Joseph Ontiveros
Soboba Band of Luiseno
Indians
Physical letter,
Telephone, Email
No response
Alesia Reed
Tones -Martinez Desert
Cahuilla Indians
Physical letter,
Telephone, Email
No response
Mary Belardo
Torres -Martinez Desert
Cahuilla Indians
Physical letter,
Telephone, Email
No response
Thomas Tortez
Torres -Martinez Desert
Cahuilla Indians
Physical letter,
Telephone, Email
No response
Gary Resvaloso
Torres -Martinez Desert
Cahuilla Indians
Physical letter,
Telephone, Email
No response
Abraham Becerra
Torres -Martinez Desert
Cahuilla Indians
Physical letter,
Telephone, Email
No response
9.0 RECOMMENDATIONS
Due to the high sensitivity of the Project area for cultural and tribal resources, and at the request of the Agua Caliente Band of Cahuilla Indians, APRMI recommends that both a tribal monitor and a qualified archaeologist be present on site to monitor any ground -disturbing activities. A full list of Mitigation Measures for Cultural and Paleontological Resources can be viewed below.
MM-CR-1. Prior to the start of Project excavation, a qualified archaeologist shall be retained and create a Worker's Environmental Awareness Program (WEAP) pamphlet that will be prepared by the Project Archaeologist and provided as during the training class to Project personnel, so they understand the regulatory requirements for the protection of cultural resources. This training class shall include examples of cultural resources to look for during project excavation and the protocols to follow if discoveries are made.
MM-CR-2: Archaeological resources monitoring shall be conducted by a professional archaeological resources monitor during Project related earth -disturbing activities, per OHP standards, under the supervision of a qualified Project Archaeologist. Monitoring 640
will entail visual inspection of Project related earth -disturbing activities in native soil.
MM-CR-3: As requested by the Agua Caliente Band of Cahuilla Indians, an approved Native American monitor, with documented ancestral ties to the area consistent with the standards of the Native American Heritage Commission (NAHC), shall be present for all ground disturbing activities that involve excavation of previously undisturbed soil, until the archaeologist and Native American monitor deems that they are no longer in soil that may contain prehistoric and/or historic artifacts, sites, or features. Monitoring will entail visual inspection of all Project -related earth -disturbing activities.
MM-CR-4: If an archaeological resource is encountered during excavation when a monitor is not on site, all excavation shall cease within at least 50 feet of the discovery and the Principal Investigator and Lead Archaeologist must be notified. Work cannot resume in the direct area of the discovery until it is assessed by the Principal Investigator and/or Lead Archaeologist and indicates that excavation can resume.
MM-CR-5A: If an archaeological discovery cannot be preserved in situ and requires an excavation team or requires additional time to collect cultural resources, a Discovery and Treatment Plan (DTP) will be developed by the Lead Archaeologist, and the area will be cordoned off and secured so that an archaeological resources excavation team, led by the Principal Investigator and Lead Archaeologist, may recover the cultural resources out of that area. Once the Principal Investigator has determined that the collection process is complete for a given area or locality, construction activity will resume in that localized area.
MM-CR-5B: If human remains are encountered, work on the project will be suspended and the City of Rancho Mirage will be contacted immediately. The City of Rancho Mirage will contact the Riverside County coroner. If the remains are deemed Native American in origin, the coroner will contact the NAHC, which will identify a most likely descendant in compliance with Public Resources Code Section 5097.98 and California Code of Regulations Section 15064.5. The most likely descendant will have up to 48 hours to visit the site and make recommendations as to the treatment and fmal deposition of the remains. Work may be resumed at the landowner's discretion but will only commence after consultation and treatment have been concluded to the satisfaction of the lead agency.
MM-CR-6: All significant cultural resources collected by the archaeologist will be prepared in a properly equipped laboratory to a point ready for curation. All significant artifacts collected will be prepared in a properly equipped archaeological laboratory to a point ready for curation. Artifacts will be identified, photographed, catalogued, analyzed, and delivered to an accredited museum repository for permanent curation and storage or to the appropriate Tribe. Accompanying notes, maps, and photographs shall also be filed at the repository. The cost of curation is assessed by the repository and is the responsibility of the Project proponent.
MM-CR-7: At the conclusion of laboratory work but prior to museum curation, a fmal (negative 641
or positive) findings report will be prepared describing the results of the cultural mitigation monitoring efforts associated with the project. The report will include a summary of the field and laboratory methods, an overview of the cultural background within the project vicinity, a list of cultural resources recovered (if any), an analysis of cultural resources recovered (if any) and their scientific significance, and recommendations. A copy of the report will be prepared for the City of Rancho Mirage, the EIC, and be submitted to the designated museum repository (if applicable).
MM PAL -1: Prior to the commencement of grading or excavation activities, the Lead Paleontologist retained for the construction of Rancho Mirage 9 Lot Subdivision Project, shall create a Worker's Environmental Awareness Program (WEAP) pamphlet that will be prepared and provided by the Project Paleontologist and provided as during the training class to Project personnel, so they understand the regulatory requirements for the protection of paleontological resources. This training class shall include examples of paleontological resources to look for during project excavation and the protocols to follow if discoveries are made.
MM PAL -2: In the event that a paleontological resource is encountered when a monitor is not on site, all construction shall cease within at least 50 feet of the discovery and the Principal Investigator and/or Lead Paleontologist must be notified immediately. If the monitor is present at the time of discovery, then the monitor will have the authority to temporarily divert the construction equipment around the find and notify the Principal Investigator and/or Lead Paleontologist until it is assessed for scientific significance. Work cannot resume in the direct area of the discovery until it is assessed by the Principal Investigator and/or Lead Paleontologist and he/she indicates that construction can resume.
MM PAL -3: In the event that a paleontological resource is encountered, the Lead Paleontologist will implement the Paleontological Management Treatment Plan (PMTP) prepared for Rancho Mirage 9 Lot Subdivision Project. The purpose of the PMTP is to achieve compliance with the California Environmental Quality Act (CEQA), and local governmental agencies concerning the treatment of unexpected paleontological finds which are significant at the federal, state, and/or local level. Based on the sensitivity of the area, APRMI recommends the following monitoring mitigation measures that would comply with the Paleontological Management Treatment Plan and reduce the potential affects to any paleontological resource to a less than significant impact.
MM PAL -4: If a paleontological discovery requires an excavation team or requires additional time to collect specimens, or the size of the discovery is more than a monitor can collect during standard daily monitoring services, a Discovery and Treatment Plan (DTP) will be developed and the area will be cordoned off and secured so that a paleontological resources excavation team, led by the Principal Investigator and/or Lead Paleontologist, may recover the fossilized specimens out of that area once the DTP has been approved.
Once the Principal Investigator and/or Lead Paleontologist has determined that the collection process is complete for a given area or locality, construction activity will resume in that localized area.
642
MM PAL -5: Once construction activities are complete, all significant fossils collected will be prepared in a properly equipped paleontology laboratory to a point ready for curation. Laboratory preparation will include, but not be limited to, the careful removal of excess matrix from fossil remains, stabilizing and repairing specimens, identified to the lowest taxonomic level, analyzed, photographed, and catalogued before they are sent to the local repository for curation and permanent storage.
Accompanying notes, maps, and photographs shall also be filed at the repository.
The cost of curation is assessed by the repository and is the responsibility of the Project proponent.
MM PAL -6: At the conclusion of laboratory work and museum curation, a final report of findings will be prepared describing the results of the paleontological mitigation monitoring efforts associated with the project. The report will include a summary of the field and laboratory methods, an overview of the geology and paleontology in the project vicinity, a list of taxa recovered (if any), an analysis of fossils recovered (if any) and their scientific significance, and recommendations. If the monitoring efforts produced fossils, then a copy of the report will also be submitted to a designated museum repository.
1531 Pontius Ave., Suite 200 Office: (424) 246-3316
Los Angeles, CA 90025
643
Fax: (424) 248-3417
11.0 REFERENCES
Bean, Lowell John. 1978. "Cahuilla". In Handbook of North American Indians Volume 8, edited by Robert Heizer, 575-587. Washington: Smithsonian Institution.
Chase, J Smeaton. 1920. Our Araby: Palm Springs and the Garden of the Sun. Pasadena: Star - News Publishing Company.
City of Rancho Mirage. "General Plan 2017 — Chapter 2 Land Use". Accessed October 6, 2023. https://ranchomirageca.gov/wn-content/uploads/2019/01/Chapter 2 Land Use.pdf City of Rancho Mirage. "General Plan 2017 — Chapter 5 Conservation and Open Space".
Accessed October 4, 2023.
https://ranchomirageca.gov/wp-
content/uploads/2019/01/Chapter 5 Conservation and Open Space.pdf https ://sc ahome. org/page-18546
City of Rancho Mirage. 2019. "Section 31 — Specific Plan Draft Environmental Report".
Accessed October 8, 2023.
https://weblink.ranchomirageca.gov/ W ebLinklDoc V iew.aspx?id=573695&dbid=U&repo=Ranch oMirage& g1=1*1xo067z*_ga*MTE5MzU3MTEwNi4xNjk2MzYzNjEw* ga 81F8B0B3WJ* MTY5Njg2MjQxNi40LjAuMTY5Njg2MjQxNi4wLjAuMA..& ga=2.80705623.1334992848.16 96862417-1193571106.1696363610&cr=1
Coachella Valley Economic Partnership (CVEP). 2022. "Emergence: 2022 Greater Palm Springs Economic Report". Coachella Valley Economic Partnership, October 31, 2022.
Dibblee, T.W. 1954. "Geology of the Imperial Valley Region, California. In Geology of Southern California, vol. 1, edited by Richard Jahns. San Francisco: State of California Department of Natural Resources Division of Mines.
Jahns, Richard H. 1954. "Geology of the Peninsular Range Province." In Geology of Southern California, vol. 1, edited by Richard Jahns. San Francisco: State of California Department of Natural Resources Division of Mines.
James, Harry. 1960. The Cahuilla Indians. Banning: Malki Museum Press.
Justice, Noel. 2002. Stone Age Spear and Arrow Points of California and the Great Basin.
Indianapolis: Indiana University Press.
Kray, Ryan. 2004. "The Path to Paradise: Expropriation, Exodus, and Inclusion in the Making of Palm Springs". Pacific Historical Review 73, no. 1: 85-126. https://doi.org/10.1525/phr.2004.73.1 . 85
Lech, Steve. 2004. Along the Old Roads: A History of the Portion of Southern California That Became Riverside County. Self -published.
46 ArchaeoPaleo Resource Management, Inc. Rancho Mirage 9 Lot Subdivision January 2024
644
2023-16
Lewis, Larea. 2013. "The Desert Cahuilla: A Study of Cultural Landscapes and Historic Settlements". M.A. diss., University of Arizona.
Nuttal, Arwen. 2019. "Section 14: The Agua Caliente Tribe's Struggle for Sovereignty in Palm Springs, California". American Indian Magazine 20, no. 2: 28-34.
Rae, David. 2022. "Does Palm Springs Need A Luxury Gay Retirement Community? This Developer Thinks So" Forbes, March 17, 2022.
Rockwell, Thomas, Aron Meltzner, Erik Haaker, and Danielle Madugo. 2022. "The late Holocene history of Lake Cahuilla: Two thousand years of repeated fillings within the Salton Trough, Imperial Valley, California". Quaternary Science Reviews 282. https://doi . org/10.1016/j .quascirev.2022.107456.
Schaeffer, Jerry. 1994. "The Challenge of Archaeological Research in the Colorado Desert:
Recent Approaches and Discoveries". Journal of California and Great Basin Anthropology 16, no. 1: 60-80.
Society for California Archaeology. "Ceramic Types". Accessed October 4, 2023. https : //www. scahome. org/page-
18546#:—:text=The%20series%20includes%20Parker%20buff,beige%2C%20and%20Colorado %20red%20types.
Strong, William. 1929. Aboriginal Society in Southern California. Berkeley: University of California Press.
Sunnylands Trust. "Sunnylands in History". Accessed October 6, 2023. https://sunnylands.org/history/
USGS. "Topoviewer". United States Geological Survey. Accessed January 5, 2024. https ://ngmdb.usgs.gov/topoview/viewer/#15/3 3.9706/-118.3538 Warren, Claude. 1984. "The Desert Region". In California Archaeology, edited by Michael Moratto, 339-430. Orlando: Academic Press Inc.
Woodford, Alfred, John Shelton, Donald Doehring, and Richard Morton. 1971. "Pliocene - Pleistocene History of the Perris Block, Southern California." GSA Bulletin 82, no 12. 47 ArchaeoPaleo Resource Management, Inc. Rancho Mirage 9 Lot Subdivision January 2024
645
2023-16
APPENDIX A
NHM Paleontological Resources Report
48 ArchaeoPaleo Resource Management, Inc. Rancho Mirage 9 Lot Subdivision January 2024
646
2023-16
E\VESTERN Sc.i1 TcI1: CENTER
December 2It"', 2023
ArchaeoPaleo Resource Management, Inc.
RObin Turner
1531 Pontius Ave., Suite 200
Los Angeles, CA 90025
Hello,
This letter presents the results of a record search conducted for Rancho Mirage 9 Lots Project located in the City of Rancho Mirage, Riverside County, CA. The project is located at 72094 Ginger Rogers Rd_, on Township 4 South, Range 6 East, Section 30 on the Cathedral City, CA ILS_ Geological Survey 7.5'quadrangle,
The geologic units underlying this project are mapped as units of loose fine sand from the Holocene epoch (Dibblee and fvtinch 20OS). Holocene alluvial units are considered to be of high preservation value, but material found Is unlikely to be fossil nnaterial due to the relatively modern associated dates of the deposits,. The Western Science Center does not have localities within the project area or within a 1 mile radius.
While the presence of any fossil material is unlikely, if excavation activity disturbs deeper sediment dating to the earliest parts of the Holocene or Late Pleistocene periods, the material would be scientifically significant. Excavation activity associated with the development of the project area is unlikely to be paleontological ly sensitive, but caution during development should be observed,
If you have any questions, or would like further information, please feel free to contact me at bstoneburgiwest€rncenterrnuseum.ore,_
Sincerely,
Brlttrley Elizabeth Stoneburg, MSC
Collections Manager
2345 Sean Parkway • Hemet. CA 92543 • phone 951.791.003 • fax 951.791.0032 • WestemSclenceCenter_org 49 ArchaeoPaleo Resource Management, Inc. Rancho Mirage 9 Lot Subdivision January 2024
647
2023-16
APPENDIX B
EIC Cultural Resources Report
50 ArchaeoPaleo Resource Management, Inc. Rancho Mirage 9 Lot Subdivision January 2024
648
2023-16
EASTERN INFORMATION CENTER
California Historical Resources Information System
Department ofAnthropolggy, University of California, Riverside, CA 9252 1-04 1& (951)827-5745 - cikltwrr, ucr.edu
Inye. Mono, and Riverside Counties
November 20, 2023
CHRIS Access and Ilse Agreement No.: 107
ST-RIV-7268
Robin Turner
ArchaeoPaleo Resources Management Inc_
1531 Pontius Avenue #x200
Los Angeles, CA 40(125
Re: Cultural Resources Records Search for the Rancho Mime 9 Lots Project Dear Robin Turner:
We received your request on August 2L 2023 for a cultural resources records search for the Rancho Mirage 4 Lots project located %n Section, 30, T4S. R 6E, S1313M, in the South Eastern off the Ague. Caliente Indian Reservation area in Riverside County. We have reviewed our site records, maps. and manuscripts against the location map you provided.
Our records indi to that 27 cultural a-rsourccs studies have been conducted within a one -mile radius of your project arca. None of thews; studies involved the project area. PDF copies of these reports arc included for your reference_ All of these reports arc Listed on the attachment entitled "Faster Information Center Report I.istingt",
Our records indicate that 13 cultural resources properties have been recorded within a (tire -mile radius of your project area, None or these properties involved the project arca. PDF copies oldie records are included for your reference. All of these resources are listed un the attachment entitled -astern. Inf€rrmarticrn Center Resource Muir.
The above information is reflected on the enclosed maps_ Areas that have been surveyed arc highlighted in yellow. Numbers marked in blue ink rifer to the report number {RI#}. Cultural resources properties are marked in red; numbers in black refer to Trinomial designations, those in green to Primary Number designations. National Register properties are indicated in light blue, Additional sr:rurces of infortnatiotl cnnbolted are identified below.
National Register of Historic Places: rto listed properties are located within the latundarics of the project arca.
Office oil Iistoric Preservation (OHP), Archaeological Resource Directory (ARE»: One properly (P-33-009498 [CA-RIV-006381 j} is listed and is Jetermancci eligible for inclusion on the Nattr real Register of Historic Places, Two properties ((P-33-OQ949S ICA-RIV-t 38I ] and P-33-017008 [CA-RIV- 51 ArchaeoPaleo Resource Management, Inc.
January 2024
649
Rancho Mirage 9 Lot Subdivision
2023-16
00885.5i) arc listed and are ineligible for inclusion on the National Register of Historic Places. The applicable port ion of this director) is enclosed for your study needs.
Note: not all prrperfr'es era fhe Girl /ot'nia Hisiorical Resources Information System are listed in,* O1IP ARD and l3ERD_ the ARD and BERD comprise lists rr properties .submitted fc+ Me °HP firr review,
A copy of the relevant portions of the 1904 USGS Indio 7.5' Minute Series, 1444 USGS atom 15'Minute Series, 1956 USGS Santa Ana 30' Minute Series, 1958 USGS Cathedral City 7.5' Minute Series, 1958 Thousand Palms 15' Minute Series. 19.65 USGS Santa Ana 30' Minute Series topographic maps are included for your reference -
As the Information Center for Riverside.. lnyo, and Mono Counties, it is necessary that we receive a copy of all cultural resources 'twits and site information pertaining to these counties in ender to maintain our map and manuscript files. Confidential information provided with this records siearch regarding the location of Qul tural resources outside the boundaries of your project area should not be included in reports addre=ssing the project arcar.
Due to processing delays and other factors, not all oldie historical resource reports and resource records that have been submitted to the Offkcc of Historic Preservation arc available via this records t=ear 1i. Additional information may be available through the federal, staate and local agencies that produced or paid for historical resource management work in the srmreh area.
Additionally, Native American tribes have historical resource information nest in the California Ilistnrieal Resources Infbnnation System (C'IIR1S) !memory, and you should contact the Caliti nii a Native American Heritage Commission Ior inllorrrtaticn. tnt local/regional tribal contacts.
The California Office of Historic Preservation ICII1P) contracts with the California Ilistorieal Resources lnfonnation System's (CHRIS) regional Information Centers KO to maintain intormation in the CHRIS inventory and make it available to local, state, and I'ederstl agencies, cultural resource professionals, Native American tribes, researchers, and the public.
Recommendations made by the IC. coordinators or their staff regarding the interpretation and application of this information are advisory only. Such recommendations do riot necessarily represent the evaluation nr opinion of the State Historic Preserv'at'ion Officer in carrying out the OH P's regulatory authority unaer federal and state law, Sincerely,
Kenedy Jacaane
information Officer
Enclosures
52 ArchaeoPaleo Resource Management, Inc. Rancho Mirage 9 Lot Subdivision January 2024
650
2023-16
APPENDIX C
NAHC Sacred Lands Search
Responses by Native American Tribes
53 ArchaeoPaleo Resource Management, Inc. Rancho Mirage 9 Lot Subdivision January 2024
651
2023-16
ArchaeoPaleo Resource Management, Inc.
A full service Archaeology and Paleontology company
SBEASEIW0SB/DBEJUDEIE/EBE/LBE/SLBE/Cf3E/VSGE/MicroBE Certified September 14, 2023
Native American Heritage Commission
1550 Harbor Blvd, Suite 100
West Sacramento, CA 95501
(916)373-3710
[email protected]
1 would like to request a sacred lands file and Native American contacts list for the Rancho Mirage 9 Lots (Project) listed below. The proposed Project will be located at Assessor Parcel No. 685080002. The -project is located at 72094 Ginger Rogers Rd, Ranch Mirage, CA 92270. within the County of Riverside. This lot is approximately 5.04 acres and is located in Township 4 S, Range 6 E, Section 30 within the Cathedral City, CA Quadrangle. There project area is currently occupied by a small single story house and vacant lot.
The land will be used to develop a 9 lot subdivision. Please let me know if you need additional information.
Thanks,
•
Robin Turner, President/CEO
ArchaeoPaleo Resource Management Inc.
1531 Pontius Ave., Suite 200
Los. Angeles, CA 90025
(424) 248-3316 ph.
(424)248-3417 fax
rturnerfra archaeopaleo.com
54 ArchaeoPaleo Resource Management, Inc. Rancho Mirage 9 Lot Subdivision January 2024
652
2023-16
CHASE ETSON
Reginald Pagdlrtg
Cl'+la'i r4:JJ�1
V CE -C FLATRFER:Ora
Mary hteQ n
Yakarra Frimi, 3L1µ
NrafrIbki
SECRETARY
Stee Dube hke
r' Aiwa k
P0.R11fkiEM RiSra
WWI* RUIREITI
LTARA,hr3
COTATAISSI17NC
bane Selma ute
Chkoe-CCil[ait'xirl
!Valley Itodttookt
KwYleydifyy
ConneASSlevalR
laireeeti laden
SarCxio
Ca rAawssloNER
Redd hlRacunvk:h
C MIhila
CC*AfA145ICCIER
AtOrVK�
E. EC ONE SECRETARY
REIrE651161 C.
Hileh[a[k
I'Aiwok. M1/15.6nran
NAM KEikDQLIa3,RTERS
0550 Hditoul
Suit& 1110
wee Sectmlerilo,
Calf &rill 954691
1916I 373-3710
r ire, ,c 1r,o h e. on. acre
NAJIC.cd.gav
[TAW al Fr iinFraNl8
C.nvin t.rnrrm.
NATIVE AMERICAN HERITAGE COMMISSION
November I S, 2C23
Robin Turner
ArchaeoPaleo Resource Management
Via Email to: r
umerhIarc
Ioe000leo cc -
Re: Rancho Mirage if Loh Project, Riverside County
Dear Ms. Turner:
Arecord search of the t4alive American Heritage Commission [NAHC) Sacred Lands File [SLFJ was competed for the information you have submitted For the above referenced project_ The results were negative_ However, the absence of specific site information in the SLF does not indicate the absence of cultural resourcesin any project area. Other sources of cultural resources should also be contacted fcr infomnation regarding known and recorded sites_ Attached is a 5st of Native American Hoes who may also have knowledge of cultural resources in the project area_ This ist should provide a starting place in locating areas of potential adverse impact withi i the proposed project areo. I suggest you contact all of those indicated; if they cannot supply information, they :night recommend others with specific knowledge. By contacting al those isted, your organization wi be, utter able to respond lo claims of failure to cansuft with the appropriate tribe. If a response has not been received within two weeks of notification, the Comn-asion requests that you foiow-up with a telephone coil or email to ensurethat the project information has been received_
If you receive notification of change of addresses and phone numbers from tribes , please notify me_ With your assi (once, we can assure that our its contain current information.
If you have any questions or need additional informationplease contact me of my email address: Andrew_Cree«ndnahc_ca.gov.
Sincerely,
anirike(Ar
Andrew Green
Cultural Resources Anays
Aitochment
Page I of 1
55 ArchaeoPaleo Resource Management, Inc. Rancho Mirage 9 Lot Subdivision January 2024
653
2023-16
AQUA CALIENTE BAND OF CAHUILLA INDIANS
Tfl IDiL W14TI31ncE P11SiftflVATIDN
December 05, 2023
VIA EMAIL Taaprmr¢aareltaeopaleo.com]
ArchaeoPaleo Resource M iageneern Inc.
Robin Turner
I5#I Pontius Ave., Suite 200
Los Angeles, CA 470025
Rez 72014 Ginger Rogers Rd
Dear Robin Turner,
01498-21723.(45
The .Ague. Caaliente Band of Cahui [la Indians (AC BC1) appreciates your efforts to include the Tribal Historic Preservation Office ( I IPD) in the 72094 Ginger Rogers Rd project, The promo area is not located within the bormdaries of the ACBCI Reservation- However, it is within the Tribe's Traditional Use A. For this reason, the ACRCI TIIPO requests the following:
*A cultural resources inventory of the project area by a qualified archaeologist logist
prior to any development activities in this area_
*Copies of any cultural resource documentation (report rend site records p generated in connection with this project.
*A copy of the records search with associated survey reports and site records from the information center.
*The presence of an archaeola st that meets the Secretary of Interior's standards during any gmwid disturbing activities_
'The presence of an approved Agua Caliente Native American Cultural. Resource Monitor{s) during any bound disturbing activities {including archaeological testing and surveys), Should buried cultural deposits be encountered, the Monitor may request that destructive construction halt and the Monitor shall notify a Qualified Archaeologist {Secretary of the Interior's Standards and Guidelines) to investigate and. if necessary, prepare -a mitigation plan for submission to the Slate Historic P'reservatian Off eer Had the Ague Caliente Tribal historic: Preservation Office.
Again the Agua Catliente appreciates your interest in our cultural heritage_ If you have questions or require additional information, please call me at 1760) 423-334S5_ You may also email me at ACBCI-TI-1PO@a guacaliente_net-
Cordrnlly,
5400 Do,Nw.I B/+oNE ©rilvc, PAf.ir Sr.IN , CA $2264
T Tan. p6 U'bCc1M WW an LIF[ ALIENhTE-N•9n .40v
56 ArchaeoPaleo Resource Management, Inc. Rancho Mirage 9 Lot Subdivision January 2024
654
2023-16
AGUA CALIENTE BAND Of CAHUILLA INDIANS'
TlI14YP:L 416T611IC PPC IZII1VAT164
Xltlaly Madri at
Cuitural Resources Analyst
Tribal Historic Preservation Office
AGL` A CALIENTE SAND
OF CAHUILLA INDIANS
•
5401 &,wrll1 SMQIIE Qulvc, i*AlN Sra'mos, CA 02264
1 76O'tl`l d,6860 3 T'66,ilLrO51.? W6iVV A{14'A CAI.IEMTE-$45 57 ArchaeoPaleo Resource Management, Inc. Rancho Mirage 9 Lot Subdivision January 2024
655
2023-16
M
ODD
.OW per❑p=El= 3L I ❑❑.11®®❑a❑ a® P❑❑❑❑❑
SAMPSON and ASSOCIATES
CONSULTING ENGINEERS
Geotechnical, Structure, Environmental
Project No.: 23-0102S
March 03, 2023
TO: Mr. Farhad Zomorodi
9165 Alcott; #203
Los Angeles, Ca.
SUBJECT: Preliminary Soils Evaluation, (9) New Single -Family Residences On TTM NO. 38636 In The City of Rancho Mirage, California.
INTRODUCTION:
We sincerely appreciate the opportunity to be of service to you on this project. The primary purpose of this study was to evaluate the soils conditions as they impact the proposed development and to provide engineering recommendations. Our study has demonstrated that the proposed development is feasible from soils engineering point of view and that no un- mitigatable conditions have been disclosed by our studies provided that our recommendation provided in this report are incorporated fully in the design of the project.
This report presents the findings of our data review, subsurface exploration, laboratory testing, engineering analysis and evaluation, and our conclusions and recommendations.
If you have any questions regarding this report please do not hesitate to contact this office at your convenience. We appreciate the opportunity to be of service on this project.
Respectfull
SAMPSO
P. O. Box 834, San Dimas, California 91773 Tel.: (909) 522-7067 E -Mail: [email protected]
657
Er ETU ❑❑L=❑❑❑❑
MD -Ell ❑❑❑❑❑❑❑
Rancho Mirage Terrace
r,u
ured Care
co
a
o-
2 Q
CD
0 Ginger Rogers Rd
Tolerance
Education Center Nr
q9 Siena Vista Court
9io Siena Vista Ct
P-
c
SITE
Via Fl oren.cia
Milligan Dermatology
Via Montagna
Ginger Rogers Rd
Via Florencia
0 Lu
0 Via FlorE
Index Map
Of
mm ❑ ❑ ❑❑❑❑❑6
N/E Corner Of Landy Lane and
Ginger Rogers Road
❑ LD LURED ❑ Mir❑❑❑❑
❑❑ 1 r❑[ill
658
❑r❑
MErm rn❑ irm
❑❑ LIwW
SCOPE OF STUDY:
The purposes of this study are to identify on -site, near -surface soil conditions that may affect the proposed developments and provide soils engineering recommendations for site preparation, temporary excavations, foundation design, slabs -on -grade, and drainage recommendations.
1. Site visit and review of pertinent documents.
2. Excavation, logging, and sampling of (5) exploratory Boring to a maximum depth of (7) feet for foundation evaluation. Boring locations were covered with asphalt and we had to saw -cut the locations to drill and sample the soils.
3. Laboratory testing of selected samples to determine the engineering characteristics of onsite soils.
4. Engineering analysis of collected data and information obtained from our field study, laboratory testing, and literature review.
5. Development of soils engineering recommendations for site preparation, grading, and Soils engineering design criteria for building foundations, slab -on grade construction, underground utility trenches, temporary excavations, retaining walls, and drainage.
6. Preparation of this report presenting our findings, conclusions, and recommendations Including maps and illustrations.
ACCOMPANYING MAPS, ILLUSTRATIONS, and APPENDICES:
Index Map - Page 2
Plate 1 Approximate Boring Location Map
Appendix "A" - References
Appendix "B" - Boring Logs
Appendix "C" - Laboratory Test Results
Appendix "D" - General Earthwork and Grading Specification
659
❑r❑
❑❑LuwW
MErm rinnriDm
SITE LOCATION, PROPOSED DEVELOPMENT, and CONDITION:
The proposed development consists of (9) single-family residences with associated parking spaces located on north-east corner of Landy Lane and Ginger Rogers Road, ❑❑M ❑ ❑ ❑❑❑❑❑6 in the City of Rancho Mirage, California. Access to the site is available via improved Ginger Rodgers Road. The site is occupied with a small residence located on south side of the lot which is proposed to be completely demolished becoming part of new development.
The subject site is flat regular rectangular shape lot bounded by Ginger Rodgers Road on south, by Landy Lane on west, and by developed residential properties on east and north.
Project is covered with native weeds and large bushes. Drainage onsite is uncontrolled by sheet flow towards south.
This office must review the Foundation Plans prior to permit issue. Although building loads were not provided, we would expect the loads to be typical of residential construction. The building will be supported on shallow continuous footings and slab -on -grade. The remaining of the property will be landscaped or paved.
SUBSURFACE INVESTIGATION:
To evaluate the subsurface condition of the subject sites, Five (5) exploratory Borings were drilled to maximum depths of (7) feet as shown on Plate -1. The excavations were then backfilled. The test Pits were logged and sampled. Bulk and relatively undisturbed samples were collected for proper laboratory testing.
SUBSURFACE CONDITIONS:
Soil materials encountered in our borings consisted loose fine sand deposit deposited by prevailing winds, sand and gravel of the valley area. The approximately 24 inches of loose to very loose and dry light greyish alluvial sand with fine silt and gravel of major creeks and stream washes material underlain by loose and dry light greyish sandy fine silt soils to dense and moist sandy silty soils within the depth of our borings.
Field observation, probing, and testing of the subsurface material indicates that approximately upper approximately 4+ feet of the onsite soils appears to be loose, dry, and collapsible under proposed structural load.
660
❑r❑
MErm rinnriDm
❑❑LuwW
GROUND WATER:
No Ground water or any perched ground water was observed at our (4) exploratory borings onsite during the course of our investigation.
LABORATORY TEST RESULTS:
Laboratory tests were performed to identify the engineering characteristics of the onsite soils with respect to the proposed development at the site. A description of these test procedures is presented in Appendix "C", along with the results of these tests.
Laboratory testing included in -place moisture/density, maximum dry density/optimum moisture content, and direct shear.
A summary of the test results is presented below:
Based on our visual inspection and testing, the onsite soils are expected to have a very low potential for expansion.
Maximum dry density and Optimum moisture of representative onsite native soils is 125 pcf and 7.0 percent respectively.
The maximum dry density and optimum moisture content of typical onsite soils are determined by ASTM Test Method D1557.
Shear strength test was performed on representative samples for undisturbed conditions. Direct shear test results on native soil sample indicates a cohesion and frictional strength of 50 psf and 28 degrees, respectively.
Soluble sulfates test result is included in Appendix "C", however, soluble sulfate test must be verified after completion of grading.
661
❑r❑:m❑ ❑L❑❑m❑❑❑❑
M❑I'm ❑ ❑ ❑❑❑❑
CONCLUSIONS and RECOMMENDATIONS
Based on the field, laboratory data, and our analysis, it is our opinion that the proposed developments are feasible, provided that the recommendations in this report are incorporated fully in the design and construction stages of the projects.
FAULTING and SEISMICITY:
The Southern California region is considered to be tectonically active because of its historically high seismic activity. As with most of southern California, the site can be expected to experience moderate to severe ground shaking during the design life.
The effects of seismic shaking can be mitigated through consideration of the parameters and by design in accordance with the latest Uniform Building Code and the Structural Engineers Association.
Seismic Coefficients Per 2022 CBC Code are as follow:
Site Longitude: W 116.4044733
Site Latitude: N 33.7944302
Site Class: "D"
Fy: 1.0
Fv: null -See Section 11.4.8
LIQUEFACTION ANALYSIS:
There are some number of factors which affect the liquefaction characteristics of any given sand. It is now recognized that these include: relative density, grain structure or fabric, length of time the sand is subjected to sustain pressures, the value of the lateral earth pressure, coefficient, and prior seismic or other shear strains to which the sand may have been subjected. According to our site visit, soil classification, and, our soils evaluation and laboratory testing for in -place moisture/densities, the onsite soils are primarily dens silty sand/sandy silt. It is our professional opinion that based on the under -laying dense to hard sandy silt/silty sand soils and considering the deep groundwater below grade, the potential for liquefaction is remote.
662
USGS web services were down for some period of time and as a result this tool wasn't operational, resulting in timeout error.
USGS web services are now operational so this tool should work as expected.
Landy Ln & Ginger Rogers Rd, Rancho Mirage, CA 92270, USA Latitude, Longitude: 33.7944302, -116.4044733
Hitto
h
15r
gad Dr
irafelgar Square
Go gle
0o
10 CD
o
D
Ginger Rogers Rd
r -
o
w
OSHPD
Ginger Rogers Rd
Map data O2024 Google
Date
Design Code Reference Document
Risk Category
Site Class
5/29/2024, 5:25:11 PM
ASCE7-16
I I
D - Stiff Soil
Type Value
Ss 1.78
S1 0.739
SMS 1.78
SM1 null -See Section 11.4.8
SDS 1.187
SD1 null -See Section 11.4.8
Description
MCER ground motion. (for 0.2 second period)
MCER ground motion. (for 1.0s period)
Site -modified spectral acceleration value
Site -modified spectral acceleration value
Numeric seismic design value at 0.2 second SA
Numeric seismic design value at 1.0 second SA
Page b i
Type Value
SDC null -See Section 11.4.8
Fa 1
Fv null -See Section 11.4.8
PGA 0.773
FPGA 1.1
PGAM 0.851
TL 8
SsRT 2.097
SsUH 2.343
SsD 1.78
S 1 RT 0.823
S1UH 0.935
S1 D 0.739
PGAd 0.773
PGAuH 0.917
CRS 0.895
CR1 0.88
Cv 1.456
Description
Seismic design category
Site amplification factor at 0.2 second
Site amplification factor at 1.0 second
MCEG peak ground acceleration
Site amplification factor at PGA
Site modified peak ground acceleration
Long -period transition period in seconds
Probabilistic risk -targeted ground motion. (0.2 second) Factored uniform -hazard (2% probability of exceedance in 50 years) spectral acceleration Factored deterministic acceleration value. (0.2 second) Probabilistic risk -targeted ground motion. (1.0 second) Factored uniform -hazard (2% probability of exceedance in 50 years) spectral acceleration.
Factored deterministic acceleration value. (1.0 second) Factored deterministic acceleration value. (Peak Ground Acceleration) Uniform -hazard (2% probability of exceedance in 50 years) Peak Ground Acceleration Mapped value of the risk coefficient at short periods
Mapped value of the risk coefficient at a period of 1 s Vertical coefficient
Pge8664
❑r❑
MErm rn rinm
❑❑LuwW
RECOMMENDATION
General Site Grading:
All grading shall be performed in accordance with the Local Standards and General- Earthwork/Grading Specifications on this report (Appendix "D") except as modified in the text of this report.
The following soils engineering recommendations for site preparation, foundation, and slabs -on -grade should be incorporated into final design and construction stages of the project and should be in conformance with local governmental regulations contained herein, whichever is more restrictive. All such work and design, and slabs -on -grade should be incorporated into final design and construction practice.
SITE PREPARATION and GRADING:
Removal and Re -Compaction:
Prior to any grading operations, the site must be cleared of all surface and subsurface obstructions including uncertified fill, any existing structure, grass, weeds, large and small tree stumps, debris, trash, and residual topsoil. Any underground obstruction encountered must be located, removed, and backfilled with clean soils under supervision and testing of the soils engineer.
Based on our site observation, testing, and evaluation, the subsurface material at present condition (building area) are damp to moist, loose/soft, and compressible within the upper (4+) feet below existing grade. Following clearing and stripping, grading of the site shall be initiated by removals of upper 4+ feet and scarification of approximate (12) inches within building area and 5 feet beyond footprints. Bottom of all excavations to receive fill must be inspected by the soils engineer, scarified 12 inches, moisture -conditioned as -necessary to satisfaction of soils engineer (flooded), and re -compacted to a minimum 90% of relative dry density under supervision and testing of the soils engineer.
After removal of deleterious material and debris, the exposed bottom of building area shall be inspected by the soils engineer to verify the above findings. If conditions differs from those encountered, our conclusions and recommendations may be re-evaluated.
665
❑r❑
MErm rn rinm
❑❑LuwW
PRELIMINARY FOUNDATION RECOMMENDATIONS:
It is our opinion that the proposed project may be supported on continuous footings. All footings must be designed by structural engineer founded in native or approved compacted certified soils provided by the above recommended over -excavation and re -compaction.
No foundation plan was available to us at the time of our investigation, therefore, the proposed footings shall be designed by the structural engineer and shall be reviewed by this office prior to construction.
Following parameters are preliminary recommendations in design of foundations and are based on a low expansion potential.
CONTINUOUS FOOTINGS:
All foundation system for this project must be designed by the structural engineer. Final foundation design should be reviewed by this office prior to construction.
Following soils parameters may be used in design criteria of the project.
Allowable Bearing Pressure:
Coefficient of Friction:
Passive Lateral Pressure:
Single -Story:
Footing Depth Min.:
Footing Width Min.:
Two -Story:
Footing Depth Min.:
Footing Width Min.:
1900 psf Approved Fill or Native
0.28 Approved Fill or Native
250 pcf Approved Fill or Native
18 -Inch Into Approved Soils -To Be Designed By The Structural Engineer- Min 1- #4 rebar @ Top and 1- #4 Rebar @ Bottom 15 -Inch- To Be Designed By The Structural Engineer
24 -Inch Into Approved Soils -To Be Designed By The Structural Engineer- Min 2- #4 rebar @ Top and 2- #4 Rebar @ Bottom 18 -Inch- To Be Designed By The Structural Engineer
No Lateral Pressure increase is allowed.
The above foundation parameters shall be superseded by more restrictive design requirements from the architect, structural engineer, and/or governing agency.
For design, resistance to lateral loads can be assumed to be provided by friction along the base of the foundation and by passive earth pressures on the side of the foundation. An allowable friction coefficient of 0.28 may be used with the vertical dead loads, and an allowable lateral passive pressure.
The friction value is for the total of dead and frequently applied live loads and may be increased by one third for short duration loading, which includes the effects of wind or seismic forces.
Resistance to lateral loading may be provided by passive earth pressure within the layer below the base of the excavation.
666
❑r❑
MErm rn rinm
❑❑LuwW
RETAINING WALL:
Retaining walls should be designed for the following active lateral soil pressure:
Equivalent Fluid Pressure: 35 pcf - Level Backfill
45 pcf - 2:1 Sloping Backfill
70pcf-AtRest
Any additional surcharge pressure behind the wall should be added to these values. If import soil is used for backfill, other lateral soil pressures may apply and shall be determined by inspection and/or testing. For lateral restraint, the following soil design parameters may be used when all the foundation recommendations are followed:
Passive Lateral Pressure (EFP): 250 pcf
Coefficient -Of- Friction: 0.28
Bearing Pressure: Approved Soils 2000 psf
Lateral Soil pressure increase due to
additional width or depth to Max. 1800 psf : 250 psf/1 foot Minimum Depth of Footing In Approved Soils: 12 Inches
All footings must be embedded in approved soils certified by the soils engineer.
An adequate sub -drain system shall be constructed behind the retaining walls at base to allow adequate drainage and to prevent building of excessive hydrostatic pressures. Typical sub -drains may include weep holes with gravel pockets, perforated pipes surrounded by filter rock, or other approved methods. Outlets should pass below the base of the wall at a minimum 2 percent gradient.
Backfill directly behind retaining walls may consist of self compacting 3/4" maximum gravel or clean sand water jetted into place to obtain proper compaction. If other types of soil are used for backfill, mechanical compaction method will be necessary to achieve a relative compaction of at least 90% of maximum dry density. Backfill directly behind retaining walls shall not be compacted by wheel track or other rolling method unless the wall is designed for the surcharge loading from the compaction equipment.
667
❑r❑
❑❑LuwW
Maimrnri m
If gravel, clean sand, or other imported granular backfill is used behind the retaining wall, the upper 18 inches of backfill shall consist of typical on -site soil to prevent the influx of surface runoff into the granular backfill and into sub -drain system.
All excavations shall be stabilized within 30 days of initial excavation. Water should not be allowed to pond on top of the excavations nor to flow toward it. No vehicular surcharge shall be allowed within 3 feet of the top of the cut. Any fill which is placed shall be approved, tested and verified by registered soils engineer.
Footing excavations shall be inspected by soils engineer prior to the placement of reinforcing steel and concrete to ensure that competent bearing materials have been encountered. The exact required footing depths are not known at this time and will have to be verified by means of a footing inspection.
It should be noted that a large portion of the anticipated settlement will occur during and soon after the actual construction of the structure. However, additional differential settlement will occur over a period of time. For footings thus designed and constructed, total and differential settlement with the above requirements are anticipated to be negligible provided our recommendations are followed.
Contractors should be informed that the use of heavy compaction equipment in close proximity to retaining walls can cause excessive wall movement and/or earth pressure in excess of design values.
For excavations made during dry seasons where rain is not expected, the excavations shall be cut back 1/2:1 (horizontal to vertical). If unseasonal rainfall is encountered excavation shall be cut back to 3/4:1 (horizontal to vertical) and the open cut shall be adequately protected from saturation or erosion.
Footings adjacent to a descending slope which is steeper than 3:1 in gradient shall be located a distance away from the face of the slope as required by Slope Setback Requirements of the latest Uniform Building Code. Where more restrictive, the safety requirements of OSHA regulations shall be followed.
668
❑r❑
❑❑LuwW
Maimrnri m
If you have any questions regarding this report please do not hesitate to contact this office at your convenience. We appreciate the opportunity to be of service on this project.
SETBACKS:
All setbacks required by governing agency must be followed.
TEMPORARY EXCAVATION:
Temporary construction excavation shall be made vertically without shoring to a depth of maximum 5 feet below adjacent surrounding grade. For deeper cuts, the slopes should be properly shored or sloped back to at least a 1:1 (horizontal:vertical) ratio or flatter.
SLAB -ON -GRADE:
Concrete floor slabs (if any) should have a minimum thickness of (4) inches and be reinforced with No. 3 bars spaced 18 inches on center, both ways. All slab reinforcement should be supported on chairs or brick to ensure the desired placement near mid depth placed at mid -height in the slab. If moisture sensitive floor covering is to be placed, we recommend that a 6 -mil visqueen barrier be placed beneath slabs. A 2 -inch sand layer between the slab and barrier is recommended to protect the barrier and aid in concrete curing.
Prior to placing sand and Visqueen, the slab sub -grade shall be moisture -conditioned to a depth of 18 inches to 5 percent above optimum moisture content as approved by the soils engineer.
All slabs intended to carry any concentrated loads should be designed by a structural engineer.
Weakened plane joints shall be provided to reduce the probability of cracks.
Additional or heavier reinforcement shall be necessary for structural considerations as determined by the project architect or structural engineer.
Final recommendations for slab and foundation shall be made on the basis of observation and testing of the soils at pad grade upon completion of grading.
669
❑r❑
MErm rn rinm
❑❑LuwW
FILL PLACEMENT and COMPACTION:
The voids generated from removals of any underground obstructions and any utilities may be backfilled with onsite soils once free of organic material, debris, boulder and rocks larger than 6 inches in size. Bottom of excavation should be inspected by qualified soils engineer, scarified one foot, flooded uniformly, and re -compacted to a minimum 90% of relative dry density.
If the proposed finished grades are established at or above the existing grades, import soils would be required to accomplish the grading work. All import soils must be granular coarse material free of organic and rocks larger than 6 inches in diameter and should be approved by soils engineer prior to import.
All fill soils should be placed in layers not exceeding 6 to 8 inches in loose thickness approved by the soils engineer, and compacted to at least 90 percent of the maximum dry unit weight as determined by ASTM Designation D1557-91 Compaction Method.
In -Place density tests should be made by the required degree of compaction and the proper moisture content. Where compaction of less than 90 percent is indicated, additional compactive effort should be made with adjustment of the moisture content or layer thickness, as necessary, until at least 90 percent compaction is obtained.
SURFACE DRAINAGE:
Surface drainage should be directed away from foundations and slopes toward the streets or approved drainage devices. Ponding of water adjacent to the foundations and retaining walls must be avoided. Planters which are located within the residence should be sealed or sloped away from the structure to drain to a safe point of collection. Planters located adjacent to a raised floor structure should be sealed to the depth of the footings. A program for maintenance of drainage devices should be developed by the owner.
TRENCH BACKFILL:
Trench excavations for utility pipes shall be backfilled with granular soils under the observation of the soils engineer. After the utility pipe has been laid, the space under and around the pipe shall be backfilled with clean, granular soil having a sand equivalent of 30 or greater to a depth of at least one foot over the top of the pipe before the controlled backfilled is placed. The soils material approved by the soils engineer shall be moisture - conditioned and mixed, as necessary, prior to placement in lifts over the sand backfill. The controlled backfill shall be compacted by mechanical methods to a minimum relative compaction of 90 percent of their relative maximum density.
Field density tests and inspection of the backfill procedures shall be made by this firm during backfilling to ensure that proper moisture content and uniform compaction is being maintained.
670
❑r❑
ML'm ❑❑❑n❑❑❑
PRE -JOB CONFERENCE:
It is imperative that no clearing and/or grading operations be performed without the presence of a representative of this firm. An on -site, pre job meeting with the inspector, developer, contractor, and the soils engineer should occur prior to all grading related operations.
It would be stressed that operations undertaken at the site without the presence of the soils engineer may result in exclusions of affected areas from the final compaction report for the proj ect.
OBSERVATION and TESTING:
The recommendations provided in this report are based on preliminary design information and subsurface conditions as interpreted from limited excavations at the site. Our investigation consisted of a field exploration, laboratory testing of typical soil types, a review of the information obtained in this exploration and testing phases, and preparation of this report.
The conclusions and recommendations presented in this report have been prepared in accordance with generally accepted engineering principals and practices, and have incorporated federal, state and local laws, codes, ordinances and regulations which in our professional opinion are applicable at the time of preparation of this report. The logs show subsurface conditions at the dates and locations indicated, and may not be representative of subsurface conditions at other locations and times. Should soil conditions be encountered during construction that appear different from those shown in this report, this office shall be notified immediately so that our recommendations may be re-evaluated.
Our preliminary conclusions and recommendations shall be reviewed and verified during the site grading, and revised accordingly if exposed condition vary from our preliminary findings and interpretations.
The engineering consultant shall provide observation and testing during grading of the subject site. The consultant shall prepare a final as -graded report summarizing the conditions countered and any field modification to the recommendations provided herein. It is recommended that a representative of this office be present when the excavation is first exposed. Modifications to our recommendations may be necessary if significant variation in the soil conditions are encountered.
It shall be noted that the recommendations presented herein is for use in design and for cost estimating purposes prior to construction. The contractor is solely responsible for safety during construction.
This report is issued and made for sole use and benefit of the client, is not transferable and is valid as of the exploration date.
671
At!
❑❑LuwW
MErm rn rinm
ADDITIONAL OBSERVATION and TESTING MUST BE PROVIDED:
* After completion of site clearing, prior to grading.
* During removal of any existing underground obstructions (if any). * After removal of unsuitable soils for bottom inspection and during placement of any fill material for laboratory testing of onsite soil, import soils, and compaction testing. • After footing excavation, prior to placement of steel and pouring concrete. • After pre -saturation of the slab sub -grade prior to placement of sand and Visqueen. * During any additional fill placement and compaction.
* When any unusual conditions are encountered
Any unusual condition encountered during site development not discussed in this report shall be brought to our immediate attention.
672
IN THE CITY OF RANCHO MIRAGE, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA CID
UI
O
�Z
O O
C C[
mc�
O
0 O
C
0 0 0\
< <
3 08
OD
m
°
O1
OD
0 k
CD
H
CO
X
w
O
O
W O
CC
1 �
U
CC
TENTATIVE TRACT N/IHNF) N0. 38636
BEING A SUBDIVISION OF GOVERNMENT LOT 16 IN THE NORTHWEST 1/4 OF SECTION 30, TOWNSHIP 4 SOUTH, RANGE 6 EAST, S.B.M.
S.D. ENGINEERING AND ASSOCIATES
19,590
0.45 AIRES
97.34'
B-5
T-2
REV.
REVISION DESCRIPTION
DATE
ENGR.
CITY
DATE
(VAC
J Bac-nj-0E-30
())
NT AND
126.50'
18,532 S .F .
0.43 ACRES
665.13
L
\ 0 ° 11 '34 'E 509.23 '
99 99
KID ATE
r r j\
(5]N
0 oximate Loc
LANK
J-
�0
�� 130.00
66 'z
O
H
H-
U
II
J zo z o J � J
oz
ion
19,044 .F .
0.44 CRES
1-tAl
plo
ion Of llnfilfr
LANDSEAPTNG
NOVEMBER, 2022
3,456 S.F.
.42 ACRES
`1-
18,634 S .F .
0.43 ACRES
ry Borihgs=
a ion Test
O
ROAD
Plate -1
\ 0 °11'34 "E 1330.26'
z
O
H
H-
O
ID
IL
�IL
CI) U_
Z
rZ
LU
CC Z
CO C_D
O
LU
CI) CC
i
LU
CC
DINAH SHORE
SITE
DRIVE
GINGER
UJ
CL
GERALD FORD
ROGERS RD.
VIA MARTA
DR.
DRIVE
CO
CO
VICINITY MAP
NTS
1. OWNER/SUBDIVIDER
72094 GINGER R0GERS LLC
ATTN: MR. FARHAD Z0M0RADI
P.O. BOX 10544
BEVERLY HILLS, CA 90213
PH: (310) 428-2875
2. ENGINEER
S.D. ENGINEERING AND ASSOCIATES
242 E. AIRPORT DRIVE, STE. 212
SAN BERNARDIN0, CA 92408
PH: (909) 215-3451
3. LEGAL DESCRIPTION
GOVERNMENT LOT 16 IN THE NORTHWEST 1/4 OF
SECTION 30, TOWNSHIP 4 SOUTH, RANGE 6 EAST,
4. ASSESSORS PARCEL NO:
685-080-002
5. ZONING
EXISTING AND PROPOSED:
VERY LOW DENSITY RESIDENTIAL (R -L-2)
6. ACREAGE
4.37 ACRES
7. LETTER LOT AREAS
GRAPHIC SCALE
O
S . D
. ENGINEERING AND ASSOCIATES
LAND PLANNING AND CIVIL ENGINEERING
242 E. AIRPORT DRIVE, STE. 212 - SAN BERNARDINO, CA 92408 PHONE (9O9) 215-3451 EMAIL: suresh@sdeng ineer ing . net SURESH DODDIAH R.C.E. 36361 DATE
441011011
DIAL u TWO WORKING
BEFORE V DAYS BEFORE
YOU DIG YOU DIG
TOLL FREE 1-800-227-2600
A PUBLIC SERVICE BY
UNDERGROUND SERVICE ALERT
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS
TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.
BENCHMARK:
CITY BM #PD 18-5
BEING A 1-1/2" C0PPERWELD IN ASPHALT, FLUSH, AT THE
CENTERLINE INTERSECTION OF BOB HOPE DRIVE AND
DINAH SHORE DRIVE.
ELEV. = 347.672
CITY OF RANCHO MIRAGE, CALIFORNIA
DRAWN BY:
EB
DESIGNED BY:
EB
TENTATIVE TRACT MAP NO. 38636
72094 GINGER ROGERS ROAD
SCALE:
DATE:
12/5/2022
CHECKED BY:
SD
DRAWING NO.:
❑r❑
APPENDIX "A"
❑❑utt-Lw
M ❑❑❑n❑❑❑
REFERENCES
1. California Division of mine and Geology, 1975, San Andreas Fault In Southern California.
2. Bolt, B.A., June 1973, Duration of Strong ground motion, Proc. fifth world conference on earthquake engineering, Rome, paper No .292, PP. 1304-1313.
3. Campbell, K.W., and Y. Bozorgia, 1994, "Near -Source Attenuation of Peak Horizontal Acceleration from Worldwide Accelerograms Recorded from 1957 to 1993," Proceedings of the 5th U.S. National Conference on Earthquake Engineering, 1994, Chicago, Illinois, Earthquake Engineering Research Institute, V.3, pg. 283-292.
4. Dibblee, T.W., 1989, "Geologic Map of the Los Angeles Quadrangle, Los Angeles County, California," map scale 1:24,000.
5. Seed Bolton, Whitman, Robert, 1970, Design of earth retaining structures for dynamic loads: ASCE Specialty Conference, lateral stresses in the ground and design of earth retaining structures, P. 103-147.
6. Terzaghi, K. (1943), Theoretical Soil Mechanics, J. Wiley and sons, Inc. New York.
A-1
675
APPENDIX "B"
676
SOIL CLASSIFICATION CHART
MAJOR DIVISIONS
SYMBOLS
TYPICAL
DESCRIPTIONS
GRAPH
LETTER
❑C_R_E
❑R❑❑JED
❑❑ELE
MERE GOO❑ DOD
E❑ MDOER IIIL
LEREER DEED
DE non-E[EEE
E®E
iR❑❑EL
❑❑D
❑R❑❑ELLY
❑❑ �❑
oEMEE 00oR0E 0
MER
GREEDS D
REEOLUED ED LEE
D ELEEE
❑LE❑❑
❑R❑❑EL-
LLLIDULE DR DD E®EDE
.. w. -.w
' L. ...4.
ID. b•. 64
.. e .. •
GW
E ELL - R DED REDELEEDREEEL ❑
u_ DM- RE L-tuLEERDE
u_ E
°`, J °`?U
030 °o
)Q 0,C)o
°00000
Q.
pC
Gp
0 RLY - R -DED ❑RDEELEE
uR__EL HD MLELIEREDELLDIDLE
ER EL
❑R❑DEL❑ 111 17111 j
❑Q=ELI °
EDDERED®DLE
❑MEDED ED EEEE0
o
°
oa
U
OC
O
GM
❑ CIY ORDOELDDDRODEL DDDOD ❑
[LELLEM®EERE0
GC
ELEYEY ❑REDELEDERDEEL ELIDED ❑
LILLY M[muDREE
❑❑❑D
❑❑D
❑❑❑DY
❑LE❑❑ ❑❑❑DC
DR DO ❑LIED❑
SW
E ELLmREDED ❑DODEEDREEELLY
❑EEDELL[DELE ER DD ELEED
:: •:: :: ;:: :: ::: :: .,';
:.
SP
DDLRLYLEREDED EEEDJE
❑RDEELLY DEODLLLIELE ER ❑❑
❑LIEE
❑❑❑D❑ ❑ 017❑
❑OE❑
mEEREDL OLE
DMEDDD DD ❑fIDEDD
..
SM
EILEY ❑EDDEDEDED LAID
MLEDEREu
.. .
SC
mY RED DDDEEIEED ❑OLDY
M
1171E
❑RD�ED
MILE ---
MERE DEED DEE
E❑ MEEERiLL ED
SMELLER DED❑
❑LIOOEE ❑LEEE
O DE
DIM
MD Lon] ED L[[iLI
LEES DEED DE
❑L❑Y❑
ML
=REDEEM DIILDE DIED EERY ELIDE
DEEDELREDK OLDDREDLELEY ER
ELEYEY E®E EDODE ER ELEYEY
ELLDE 0 ELE ELLIDD ELDDOLILLDY
%
%
/
CL
=REDEEM ELEYEDELLD ED
MED�M DLDEO� IDYDDRE❑ELLY
OLDYEEDEDDY ❑LLYEEELLEY ELEYEE
LEES ELDY❑
-
OL
ERE= DIED DED ERE DELI
EmDY LLOYD EDLED DLEOD®LIY
❑�
MD DIM
LIME] O
❑LEY❑ ❑REDDER DEED DDffj'/dV
MH
[MEREDEOI D LEEdVi®EOEEED ER
DIEEEMEDEEDED®E DEED ER
[CLOY MID
CH
RE=ELOYD DEEmD
L LaL-Y
OH
R JOLT ❑LEYE ELIMEDLIM ED
Du 0 OLEEEILI EYEEREEEL ❑LE❑
❑D]LILY ❑R❑❑❑D] D❑[LL❑
!, ,I, \", dl, =
p
❑EDEEDEMEEOE❑ EME DOLE 0 m❑
❑HE SRDOEL7 DDEEEDEE
EEDEEDDEL EYMEDLE ERE DEED DE LID®ELE EERDERLiLIE ❑O L LI lEE®LIED®DE 677
Project
Project:
No.:
Rancho
23-0101S
3O \G
3-1
LOG Sheet 1 of 1
Date 03/01/2023
Mirage
EQUIPMENT:
HOLLOW STEM
Elevation Top of Hole See Plate 1
DEPTH
(ft.)
Graphic Symbole
Sample No.
Dry Density
(pcf)
Moisture Content
(%)
Soil Classification
(U.S.C.S.)
Geotechnical Description
Sampled By MS/TS
Logged By Ms
0-
ALLUVIAL TOP -SOILS
1 3.2
0-2' DRY WEEDS MIXED WITH SANDY
5 _
© 1'-4'
SM
SILT/SILTY FINE SAND WITH TRASH,
LOOSE, VERY DRY.
1 DISTURBED
5.3 4'
O
112.2
5.3 SM
2'-4' SILTY FINE SAND TO SANDY SILT,
5'
LOOSE TO DENSE, DRY TO
10-
MOD MOIST, LIGHT GREYISH,
FINE SANDY, DENSE WITH DEPTH,
MORE MOIST.
15-
4'-7' BECOMES MORE DENSE,
LIGHT GREY SANDY SILTY, FINE,
MORE MOIST WITH DEPTH.
20 -
7'- MORE DENSE WITH DEPTH,
DIFFICULT TO EXCAVATE.
25 -
TOTAL DEPTH = 7 FEET
NO GROUND WATER
SLIGHT CAVING ON UPPER 4 FEET
30 -
1 INDICATE BULK SAMPLE COLLECTED
Aek
INDICATE UNDISTURBED SAMPLE COLLECTED
Project
Project:
EQUIPMENT:
No.: 23-0101S
3O \G
LOG Sheet 1 of 1
3-2
Date 03/01/2023
Rancho Mirage
Elevation Top of Hole See Plate 1
HOLLOW STEM
DEPTH
(ft.)
Graphic Symbole
Sample No.
Dry Density
(pcf)
Moisture Content
(%)
Soil Classification
(U.S.C.S.)
Geotechnical Description
Sampled By MS/TS
Logged By Ms
0-
5 -
10-
15-
20 -
25 -
30 -
sM
sM
ALLUVIAL TOP -SOILS
0-2' DRY WEEDS MIXED WITH SANDY
SILT/SILTY FINE SAND WITH TRASH,
LOOSE, VERY DRY.
2'-4' SILTY FINE SAND TO SANDY SILT,
LOOSE TO DENSE, DRY TO
MOD MOIST, LIGHT GREYISH,
FINE SANDY, DENSE WITH DEPTH,
MORE MOIST.
4'-7' BECOMES MORE DENSE,
LIGHT GREY SANDY SILTY, FINE,
MORE MOIST WITH DEPTH.
7'- MORE DENSE WITH DEPTH,
DIFFICULT TO EXCAVATE.
TOTAL DEPTH = 7 FEET
NO GROUND WATER
SLIGHT CAVING ON UPPER 4 FEET
679
Project
Project:
EQUIPMENT:
No.: 23-0101S
3O \G
LOG Sheet 1 of 1
3-3
Date 03/01/2023
Rancho Mirage
Elevation Top of Hole See Plate 1
HOLLOW STEM
DEPTH
(ft.)
Graphic Symbole
Sample No.
Dry Density
(pcf)
Moisture Content
(%)
Soil Classification
(U.S.C.S.)
Geotechnical Description
Sampled By MS/TS
Logged By Ms
0-
5 -
10-
15-
20 -
25 -
30 -
sM
sM
ALLUVIAL TOP -SOILS
0-2' DRY WEEDS MIXED WITH SANDY
SILT/SILTY FINE SAND WITH TRASH,
LOOSE, VERY DRY.
2'-4' SILTY FINE SAND TO SANDY SILT,
LOOSE TO DENSE, DRY TO
MOD MOIST, LIGHT GREYISH,
FINE SANDY, DENSE WITH DEPTH,
MORE MOIST.
4'-7' BECOMES MORE DENSE,
LIGHT GREY SANDY SILTY, FINE,
MORE MOIST WITH DEPTH.
7'- MORE DENSE WITH DEPTH,
DIFFICULT TO EXCAVATE.
TOTAL DEPTH = 7 FEET
NO GROUND WATER
SLIGHT CAVING ON UPPER 4 FEET
680
Project
Project:
EQUIPMENT:
No.: 23-0101S
3O \G
3-4
Elevation
LOG Sheet 1 of 1
Date 03/01/2023
Rancho Mirage
Top of Hole See Plate 1
HOLLOW STEM
DEPTH
(ft.)
Graphic Symbole
Sample No.
Dry Density
(pcf)
Moisture Content
(%)
Soil Classification
(U.S.C.S.)
Geotechnical Description
Sampled By MS/TS
Logged By Ms
0-
5 -
10-
15-
20 -
25 -
30 -
sM
sM
ALLUVIAL TOP -SOILS
0-2' DRY WEEDS MIXED WITH SANDY
SILT/SILTY FINE SAND WITH TRASH,
LOOSE, VERY DRY.
2'-4' SILTY FINE SAND TO SANDY SILT,
LOOSE TO DENSE, DRY TO
MOD MOIST, LIGHT GREYISH,
FINE SANDY, DENSE WITH DEPTH,
MORE MOIST.
4'-7' BECOMES MORE DENSE,
LIGHT GREY SANDY SILTY, FINE,
MORE MOIST WITH DEPTH.
7'- MORE DENSE WITH DEPTH,
DIFFICULT TO EXCAVATE.
681
TOTAL DEPTH = 7 FEET
NO GROUND WATER
SLIGHT CAVING ON UPPER 4 FEET
Project
Project:
EQUIPMENT:
No.: 23-0101S
3O \G
LOG Sheet 1 of 1
3-5
Date 03/01/2023
Rancho Mirage
Elevation Top of Hole See Plate 1
HOLLOW STEM
DEPTH
(ft.)
Graphic Symbole
Sample No.
Dry Density
(pcf)
Moisture Content
(%)
Soil Classification
(U.S.C.S.)
Geotechnical Description
Sampled By MS/TS
Logged By Ms
0-
5 -
10-
15-
20 -
25 -
30 -
sM
sM
ALLUVIAL TOP -SOILS
0-2' DRY WEEDS MIXED WITH SANDY
SILT/SILTY FINE SAND WITH TRASH,
LOOSE, VERY DRY.
2'-4' SILTY FINE SAND TO SANDY SILT,
LOOSE TO DENSE, DRY TO
MOD MOIST, LIGHT GREYISH,
FINE SANDY, DENSE WITH DEPTH,
MORE MOIST.
4'-7' BECOMES MORE DENSE,
LIGHT GREY SANDY SILTY, FINE,
MORE MOIST WITH DEPTH.
7'- MORE DENSE WITH DEPTH,
DIFFICULT TO EXCAVATE.
TOTAL DEPTH = 7 FEET
NO GROUND WATER
SLIGHT CAVING ON UPPER 4 FEET
682
SAMPLING PROCEDURES
Undisturbed Samples:
Samples of the subsurface materials were obtained from the exploratory borings and/or trenches in a relatively undisturbed condition. The depth at which each "undisturbed" sample was obtained is shown on the boring and/or trench logs.
The sampler used to obtain "undisturbed" samples is generally a split -barrel sampler, or a thin - wall sampler (Shelby tube).
The split -core barrel drive sampler:
The sampler, with an external diameter of 3.0 inches, is lined with 1 -inch long thin brass rings with an inside diameter of 2.41 inches. The sample barrel is driven into the ground with an effective weight of the Kelly bar of the boring machine. The Kelly bar is permitted to free -fall.
The approximate length of the fall, the weight of the bar, and the number of blows per foot of driving are noted and recorded on the boring logs. Blow counts have been noted in the log of borings as an index to the relative resistance of the sampled materials. The samples are removed from the sample barrel in the brass rings, sealed, and transported to the laboratory for testing.
Shelby Tube:
The tube, with an external diameter of 3.0 inches and a length of 2 to 3 feet, is a seamless thin - walled steel tube commonly known as a Shelby tube and has a beveled butting edge at the lower end. The tube is connected to the drill rod and pushed by a static force into the bottom of the hole. When the tube is almost full (avoid over -penetration), it is withdrawn from the hole, removed from the drill rod, sealed at both ends with paraffin, and carefully shipped to the laboratory for testing.
The Standard Penetration Test Spoon:
The spoon is driven into the ground for 18 inches with a 140 -pound hammer free -falling from a height of 30 inches. The blow counts are recorded for every 6 inches of penetration. (The reported blow counts are the blow counts for the last 12 inches of penetration.) The soil samples are examined and carefully removed from the spoon, bagged, and sealed and transported to the laboratory for testing.
Disturbed Samples:
Bulk samples of representative materials were also obtained from the borings and/or trenches, bagged and transported to the laboratory for testing.
683
APPENDIX "C"
684
MAXIMUM DRY DENSITY/OPTIMUM MOISTURE TEST RESULTS
****************************************************************************** Soil Type Soil
or Location Description
Optimum Max.
Moisture Dry Density
(%) (Pcf)
B-1 Silty Sand/Sandy Silt 7.0 125.0
at 2'-4'
EXPANSION INDEX TEST RESULTS
****************************************************************************** Soil Type
or Location
Expansion Index Potential Expansion
B-1 7 Very Low
@ 2'-4'
Soluble Sulfate
****************************************************************************** Soil Type Soil
or Location Description
B-1 Silty Sand/Sandy Silt
@ 2'-4'
Sulfate
% By Weight
0.0880
685
LABORATORY TESTING PROCEDURES
Moisture and Density Tests: Moisture content and dry density determinations were performed on relatively undisturbed samples obtained from the test borings and/or trenches. The results of these tests are presented in the boring and/or trench logs. Where applicable, only moisture content was determined from "undisturbed" or disturbed samples.
Classification Tests: Typical materials were subjected to mechanical grain -size analysis by wet sieving from U.S. Standard brass screens (ASTM D422). Hydrometer analyses were performed where appreciable quantities of fines were encountered. The data was evaluated in determining the classification of the materials. The grain -size distribution curves are presented in the test data and the Unified Soil Classification is presented in both the test data and the boring and/or trench logs.
Atterberg Limits: The Atterberg Limits were determined in accordance with ASTM D423 and ASTM D424 for engineering classification of the fine-grained materials.
Direct Shear Tests: Direct Shear Tests were performed on selected remolded and/or undisturbed samples which were socked for a minimum of 24 hours under a surcharge equal to the applied normal force during testing. After transfer of the sample to the shear box, and reloading the sample, pore pressures set up in the sample due to the transfer were allowed to dissipate for a period of approximately 1 hour prior to application of shearing force. The samples were tested under various normal loads, a different specimen being used for each normal load. The samples were sheared in a motor -driven, strain -controlled, direct shear testing apparatus at a strain rate of 0.05 inches per minute. After a travel of 0.300 inches of the direct shear machine, the motor was stopped and the sample was allowed to "relax" and "peak" shear values were recorded. It is anticipated that, in a majority of samples tested, the 15 minutes relaxing of the sample is sufficient to allow dissipation of pore pressures set up in the samples due to application of shearing force. The relaxed values are therefore, judged to be a good estimation of effective strength parameters. The test results were plotted on the "Direct Shear Summary".
For residual direct shear test, the samples were sheared, as described in the preceding paragraph, with the rate of shearing of 0.001 inches per minutes. The upper portion of the specimen was pulled back to the original position and the shearing process was repeated until no further decrease in shear strength was observed with continued shearing (at least three times re -sheared). There are two methods to obtain the shear values: (a) the shearing process was repeated for each normal load applied and the shear value for each normal load was recorded. One or more than one specimen can be used in this method; (b) only one specimen was needed, and a very high normal load (approximately 9000 psf) was applied from the beginning of the shearing process. After the equilibrium state was reached (after "relaxed", the shear value for that normal load was recorded. The normal loads were then reduced gradually without shearing the sample (the motor was stopped). The shear values were recorded for different normal loads after they were reduced and the sample was "relaxed".
686
Maximum Density Test: The maximum dry density and optimum moisture content of typical materials were determined in accordance with ASTM D 1557-91 (five layers). The results of these tests are presented in the test data.
Expansion Index Tests: The expansion potential of selected materials was evaluated by the Expansion Index Test, U.B.C. Standard No. 29-2. Specimens are molded under a given compactive energy to approximately the optimum moisture and approximately 50% saturation or approximately 90% relative compaction. The prepared 1 -inch thick by 4 -inch diameter specimens are loaded to an equivalent 144 psf surcharge and are inundated with tap water until volumetric equilibrium is reached. The results of these tests are presented in the test data.
Consolidation Tests: Consolidation tests were performed on selected, relatively undisturbed samples recovered from the sampler. Samples were placed in a consolidometer and loads were applied in geometric progression. The percent consolidation for each load cycle was recorded as the ratio of the amount of vertical compression to the original 1 -inch height. The consolidation pressure curves are presented in the test data. Where applicable, time -rates of consolidation were also recorded. A plot of these rates can be used to estimate time of consolidation.
Soluble Sulfates: The soluble sulfate contents of selected samples were determined by the California Materials Method No. 417.
"R" -Value: The resistance "R" -Value was determined by the California Materials Method No. 301 for base, sub -base, and basement soils. Three samples were prepared and exudation pressure and "R" -Value determined on each one. The graphically determined "R" -Value at exudation pressure of 300 psi is reported.
Triaxial Compression Tests: Triaxial compression tests were performed on selected remolded and/or undisturbed samples according to ASTM 2166 (Unconfined) and ASTM 2850 (Confined). 687
APPENDIX "D"
688
GENERAL EARTHWORK and GRADING SPECIFICATIONS:
1.0 General Intent
These specifications present general procedures and requirements for grading and earthwork as shown on the approved grading plans, including preparation of areas to be filled, placement of fill, installation of sub -drains, and excavations. The recommendations contained in the geotechnical report are a part of the earthwork and grading specifications and shall supersede the provisions contained hereinafter in case of conflict Evaluations performed by the consultant during the course of grading may result in new recommendations which could supersede these specifications or the recommendations of the geotechnical report.
2.0 Earthwork Observation and Testing
Prior to the commencement of grading, a qualified geotechnical consultant (soils engineer and engineering geologist, and their representatives) shall be employed for the purpose of observing earthwork procedures and testing the fills for conformance with the recommendations of the geotechnical report and these specifications. It will be necessary that the consultant provide adequate testing and observation so that he may determine that the work was accomplished as specified. It shall be the responsibility of the contractor to assist the consultant and keep him apprised of work schedules and change so that he may schedule his personnel accordingly.
It shall be the sole responsibility of the contractor to provide adequate equipment and methods to accomplish the work in accordance with applicable grading codes or agency ordinances, these specifications and the approved grading plans. If, in the opinion of the consultant, unsatisfactory conditions, such as questionable soil, poor moisture condition, inadequate compaction, adverse weather, etc., are resulting in a quality of work less than required in these specifications, the consultant will be empowered to reject the work and recommend that construction be stopped until the conditions are rectified.
Maximum dry density tests used to determine the degree of compaction will be performed in accordance with the American Society for Testing and Materials test method ASTM D1557-91.
3.0 Preparation of Areas to be Filled
3.1 Clearing and Grubbing:
All brush, vegetation, and debris shall be removed or piled and otherwise disposed of.
3.2 Processing:
The existing ground which is determined to be satisfactory for support of fill shall be scarified to a minimum depth of 6 inches. Existing ground which is not satisfactory shall be over -excavated as specified in the following section. Scarification shall continue until the soils are broken down and free of large clay lumps or clods and until the working surface is reasonably uniform and free of uneven features which would inhibit uniform compaction.
689
3.3 Over -excavation:
Soft, dry, spongy, highly fractured or otherwise unsuitable ground, extending to such a depth that surface processing cannot be adequately improve the condition, shall be over - excavated down to firm ground and approved by the consultant.
3.4 Moisture Conditioning:
Over -excavated and processed soils shall be watered, dried -back, blended, and/or mixed, as required to attain a uniform moisture content near optimum.
3.5 Recompaction:
Overexcavated and processed soils which have been properly mixed and moisture - conditioned shall be recompacted to a minimum relative compaction of 90 percent.
3.6 Benching:
Where fills are to be placed on ground with slopes steeper than 5:1 (horizontal to vertical units), the ground shall be steeped or benched. The lowest bench shall be a minimum of 15 feet wide, shall be at least 2 feet deep, shall expose firm material, and shall be approved by the consultant. Other benches shall be excavated in firm material for a minimum width of 4 feet. Ground sloping flatter than 5:1 shall be benched or otherwise over -excavated when considered necessary by the consultant.
3.7 Approval:
All areas to receive fill, including processed areas, removal areas and toe -of -fill benches shall be approved by the consultant prior to fill placement.
4.0 Fill Material
4.1 General:
Material to be placed as fill shall be free of organic matter and other deleterious substances, and shall be approved by the consultant. Soils of poor graduation, expansion, or strength characteristics shall be placed in areas designated by the consultant or shall be mixed with other soils to serve as satisfactory fill material.
4.2 Oversize:
Oversize material defined as rock, or other irreducible material with a maximum dimension greater than 12 inches, shall not be buried or placed in fills, unless the location, materials, and disposal methods are specifically approved by the consultant. Oversize disposal operations shall be such that nesting of oversize material is completely surrounded by compacted or densified fill. Oversize material shall not be placed within 10 feet vertically of finish grade or within the range of future utilities or underground construction, unless specifically approved by the consultant. 690
4.3 Import:
If importing of fill material is required for grading, the import material shall meet the requirements of Section 4.1.
5.0 Fill Placement and Compaction
5.1 Fill Lifts:
Approved fill material shall be placed in areas prepared to receive fill in near -horizontal layers not exceeding 6 inches in compacted thickness. The consultant may approve thicker lifts if testing indicates the grading procedures are such that adequate compaction is being achieved with lifts of greater thickness. Each layer shall be spread evenly and shall be thoroughly mixed during spreading to attain uniformity of material and moisture in each layer.
5.2 FM Moisture:
Fill layers at a moisture content less than optimum shall be watered and mixed, and wet fill layers shall be aerated by scarification or shall be blended with drier material.
Moisture -conditioning and mixing of fill layers shall continue until the fill material is at a uniform moisture content at or near optimum.
5.3 Compaction of Fill:
After each layer has been evenly spread, moisture -conditioned, and mixed, it shall be uniformly compacted to not less than 90 percent of maximum dry density. Compaction equipment shall be adequately sized and shall be either specifically designed for soil compaction or of proven reliability, to efficiently achieve degree of compaction.
5.4 Fill Slopes:
Compacting of slopes shall be accomplished, in addition to normal compacting procedures, by backrolling of slopes with sheepsfoot rollers at frequent increments of 2 to 3 feet in fill elevation gain, or by other methods producing satisfactory results. At the completion of grading, the relative compaction of the slope out to the slope face shall be at least 90 percent.
5.5 Compaction Testing:
Field tests to check the fill moisture and degree of compaction will be performed by the consultant. The location and frequency of tests shall be at the consultant's discretion. In general, the tests will be taken at an interval not exceeding 2 feet in vertical rise and/or 1,000 cubic yards of embankment.
691
6.0 Subdrain Installation
Subdrain systems, if required, shall be installed in approved ground to conform to the approximate alignment and details shown on the plans or herein. The subdrain location or materials shall not be changed or modified without the approval of the consultant. The consultant, however, may recommend and upon approval, direct changes in subdrain line, grade or material. All subdrains should be surveyed for line and grade after installation and sufficient time shall be allowed for the surveys, prior to commencement of filling over the subdrains.
7.0 Excavation
Excavations and cut slopes will be examined during grading. If directed by the consultant, further excavation or over -excavation and refilling of cut areas shall be performed, and/or remedial grading of cut slopes shall be performed. Where fill -over -cut slopes are to be graded, unless otherwise approved, the cut portion of the slope shall be made and approved by the consultant prior to placement of materials for construction of the fill portion of the slope. 692
❑ ❑❑❑❑d ®E C❑®❑rrm❑ E
®❑®❑❑d IJLWd M ❑r
693
Project No. 23-0102-Inf
March 04, 2023
Sampson and Associates
CONSULTING ENGINEERS
Soil, Geology, Environmental
TO:
Mr. Farhad Zomorodi
9165 Alcott, #203
Los Angeles, Ca.
SUBJECT: Infiltration Evaluation, New Single -Family Residences On TTM No. 38636 In The City of Rancho Mirage, California.
INTRODUCTION:
We sincerely appreciate the opportunity to be of service to you on this project.
The primary objective of this study was to evaluate an infiltration rate of the onsite subsurface soils for the design of the infiltration drainage system to be constructed at designated area for the above subject site.
If you have any questions regarding this report please do not hesitate to contact this office at your convenience. We appreciate the opportunity to be of service on this project.
Respectfully__Su.bmitted; -------
Sam and Associates .---'
46172
Distribu
P. O. Box 834, San Dimas, California 91773 Tel.: (909) 522-7067 E -Mail: [email protected]
694
Project No. 23-0102-Inf
March 04, 2023
Rancho Mirage Terrace
co
0 Q 0-
0 I
o
o m
4 0
1 01
co
a
cr
o
ra
C
ured Care
0 W
0 Q
T
4 rD
Ginger Rogers Rd
Tolerance
Education Center
99 Siena Vista Court
,910 Siena Vista Ct
I—
r-
C
0 Via Montagne
Ginger Rogers Rd
4;0 Milligan Dermatology
Via Florencia
Via Florencia
Via Flort
Index Map
Of
❑❑M ❑ ❑ i mm
❑❑R ❑❑I ❑ M O❑❑❑❑❑ ❑
r
695
Project No. 23-0102-Inf
March 04, 2023
ACCOMPANYING MAPS & ILLUSTRATIONS,:
Index Map - Page 2
Plate 1 - Site Plan and Approximate Location of Infiltration Tests Appendix "A" - Field Test Logs
SITE LOCATION, PROPOSED DEVELOPMENT, and CONDITION:
The proposed development consists of (5) single-family residences with associated parking spaces located on north-east corner of Landy Lane and Ginger Rogers Road, ❑❑M ❑o❑❑❑❑❑ in the City of Rancho Mirage, California. Access to the site is available via improved Ginger Rodgers Road. The site is occupied with a small residence located on south side of the lot which is proposed to be completely demolished becoming part of new development.
The subject site is flat regular rectangular shape lot bounded by Ginger Rodgers Road on south, by Landy Lane on west, and by developed residential properties on east and north.
Project is covered with native weeds and large bushes. Drainage onsite is uncontrolled by sheet flow towards south.
SUBSURFACE INVESTIGATION:
To evaluate the subsurface condition of the subject sites, Five (5) exploratory Borings were drilled to maximum depths of (7) feet as shown on Plate -1. The excavations were then backfilled. The test Pits were logged and sampled. Bulk and relatively undisturbed samples were collected for proper laboratory testing.
SUBSURFACE CONDITIONS:
Soil materials encountered in our borings consisted loose fine sand deposit deposited by prevailing winds, sand and gravel of the valley area. The approximately 24 inches of loose to very loose and dry light greyish alluvial sand with fine silt and gravel of major creeks and stream washes material underlain by loose and dry light greyish sandy fine silt soils to dense and moist sandy silty soils within the depth of our borings.
GROUND WATER:
No ground water or any perched ground water was observed at our test locations onsite during the course of our investigation.
696
Project No. 23-0102-Inf
March 04, 2023
DOUBLE RING INFILTRATION TEST:
One (I) excavation was dug by hand, to a depth of about one (4) foot below existing grade at the approximate locations of the proposed infiltration drainage system of the site in the area identified by the project civil engineer as being the area to be used for infiltration purposes. Infiltration testing was completed using a double ring infiltrometer device into the ground, water was supplied with a constant falling head condition to a fixed point. A representative from our firm conducted the actual infiltration testing to record how much of water infiltrates into the soil over a given time period.
The incremental infiltration velocity within the inner test cylinder is equivalent to the infiltration rate (in/hr). The slowest/most conservative infiltration rate of ches per hour was measured for the test hole, after the infiltration rate had generally stabilized. The testing was completed in general conformance with ASTM D 3385.
FACTOR OF SAFETY:
The infiltration rates presented are based on field test results, the rates presented are measured field rates and should not be considered design infiltration rates. The designer should consider possible site variability in their design. Application of an appropriate safety factor may be required by the authorizing agency. The design engineer must use the factor of safety with the lowest average measured infiltration rate to achieve the design value as needed. The infiltration rate is approximately 4.5 in/hr.
RECOMMENDATIONS:
Bases on the result of the tests, the site is suitable for the storm -water infiltration system from a geotechnical viewpoint. Recommendations are provided as follows:
• Based on our testing water infiltration at the site is feasible. Filter fabric should be used whenever aggregate are placed against native soils. The infiltration rates are as follow:
Test # 1 Infiltration Rate @ 4 feet depth = 6.43 in/hr.
Test # 2 Infiltration Rate @ 4 feet depth = 6.26 in/hr.
Test # 3 Infiltration Rate @ 6 feet depth = 4.5 in/hr. ÷-USe This Rate • Infiltration water should not be allowed to saturate pavement and concrete structure sub - grade soils.
• The planned infiltration system should extend vertically into native soils. The designer should review the attached geotechnical Log for soils classification. • The soils in infiltration area should not be subject to compaction during construction. • The proposed system designed by Civil Engineer should be constructed and maintained in accordance with manufacture guidelines.
• Ti -filtration facilities must not be blocked by heavy equipment by using the infiltration area as a sediment trap.
697
Project No. 23-0102-Inf
March 04, 2023
• Infiltration facilities should be constructed late in the site development after soils has been stabilized or should be protected by flagging until work is completed. • A minimum distance of 10 feet in any directions shall be provided from the building foundation to the proposed stormwater infiltration system. • The potential for creating perched water conditions that may adversely affect the proposed and existing structures is nil due to the onsite permeable soils. • The subsurface soil will not exhibit instability as a result of implementing the proposed BMP's.
• There will be no geotechnical hazards posed to the proposed and existing structures on and adjacent to the site, if a minimum distance of 10 feet in any directions provided from the building foundations to the proposed stormwater infiltration system. • It must be noted that over the lifetime of the disposal area the infiltration rate may be affected by sediment build ups and biological activities as well as local variation in soils subsurface condition.
• Ferrous metal pipes should be protected from potential corrosion by bituminous coating, etc.
We recommend that all utility pipes be nonmetallic and/or corrosion resistance.
Recommendation should be verified by soluble sulfate and corrosion testing of soils samples obtained from specific locations during construction.
LIMITATONS:
Based on our visual observation it appears that the soils condition to be the same throughout the site however; soils material may vary in character between excavations and natural outcrops or conditions exposed during construction. Should soil conditions be encountered during construction that appear different this office must be notified immediately so that our recommendations may be re-evaluated.
698
Project No. 23-0102-Inf
March 04, 2023
APPENDIX "A"
C v
%TWO WORKING
/ DAYS BEFORE
YOU DIG
1-800-227-2600
A PUBLIC SERVICE BY
UNDERGROUND SERVICE ALERT
REV.
REVISION DESCRIPTION
ENGR.
CITY
DATE
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS
TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.
BENCHMARK:
CITY BM #PD 18-5
BEING A 1-1/2" COPPERWELD IN ASPHALT, FLUSH, AT THE
CENTERLINE INTERSECTION OF BOB HOPE DRIVE AND
DINAH SHORE DRIVE.
ELEV. = 347.672
CITY OF RANCHO MIRAGE, CALIFORNIA
DRAWN BY:
EB
DESIGNED BY:
EB
TENTATIVE TRACT MAP NO. 38636
72094 GINGER ROGERS ROAD
SCALE:
1"=20'
DATE: 12/5/2022
CHECKED BY:
SD
DRAWING NO.:
Project No. 23-0102-Inf
March 04, 2023
DOUBLE RING I NFJ LTRONIETER TEST DATA
Project Name and Test Location:
Constants-
Rine Jara
Liquid Containers
Rancho Mirage
lea_ -fir
(in`)
DT Eh of
Liquid (in`
No.
Vol.. V
(in3tin)
Inner Ring:
113
4 1
78.54 Test By: FDC FISTS Class:
SM
Annular Space:
339
4.1 2
176.7
Water Table Depth:
S0'
Penetration of Rings. into Soil (in.):
Inner:.
3 Inch
Outer
7 Inch
Date of Test: 3101/23 Liquid Used:
Water
pH:
7.3 I
round Temp (E):
61 at Depth.
4'
Liquid Level Maintained by using:
( ) Flow Valve ( ) Flout Valve ( ) Marriotte Tube ( ) Other:
Additional C arnments:
Depth Below Surface = 4'
Time
iate� a1
Time
�(hr:mit;
Eft
(� °�'
Total
Inner Ring
Annular Ring
Liquid
Tem Remark_
p
°F
Infiltration Rate, I
Elev., .,
H (In)
1H
(in) &
El..;-.:
H (!n)
Ail
(m) &
Inner
imhr
Outer
in.hr
1 - Start
7:15
5 2.00
2.25 1.00
3.25 57.00
18.77 20.22
End
7:20
5 4.25
176.72
4.25 574.28
57.00 _ S tart
7:20
10 4.25
4.00 4.25
5.50 57.00
16.68 17.20
End
7:30
15 8.25
314.16
9.75 971.85
57.00 3 - Start
7:30
15 8.25
3.75 9.75
5.25 57.00
10.43 19.95
End
7:45
30 12.0
294.53
15.00 927.68
57.00 4 - Starr-
7:45
30 1.0
7.0 1.00
5.50 58.00
73 5.73
Refilled Tube
End
8:15
60 8.0
549.76
6.50 971.85
60.00 7 - Start
8:15
30 1.0
6.0 6.50
8.00 60.00
8.34 8,34
Refilled Tube
End
9:15
90 7.00
471.24
14.50 1413.60
61.00 6 - Start
9:15
60 1.0
11.0 1.00
11.00 61.00
7.65 5.73
Refilled Tube
ad
10:15
150
12.00 863.94
12.00 1943.70
62.00 - Stan
10:15
60 0.50
10.50 1.00
11.00 62.--
7.30 5.73
Refilled Tube
End
11:15
180
11.0 824.67
12.00 1943.70
63.00 8 - Start
11:15
60 1.0
9.25 1.00
10.26 63.00
6.43 5.34
Refilled Tube
End
12:15
240
10.25 726.50
11.25 1811.1&
63.00 3 . Start
12:15
60 1.00
9.25 1.00
10.00 64.00
6.43 5.21
Refilled Tube
End
1:15
300
10.25 726.50
11.00 1767.00
64.00 ID _ Stan
1:15
60 1.00
9.25 1.00
10.00 64.00
6.43 5.21
Refilled Tube
End
2:15
360
10.25 726.50
11.0 1767.00
64.00 11 - Start
Use
4.5 In/hr
End
" - Start
End
-_ Start
End
:4 -Start
End
15 - Start
End
xFla , Qf= Ali xVt.
**Infiltration Rate. I = (Qf Ary.t
Table 3 — Sample Test Data Form for Double Ring Infiltrometer Test Riverside County - Low Impact Development BMP Design Handboo a 1
rev. 9/2011
B-Bbbbbbb 1
Project No. 23-0102-Inf
March 04, 2023
DOUBLE RING INFILTROMETER TEST DATA
Project Name & Test Lola f.1
Ring Data
Liquid Containers
Vr
(in3/in
)
Rancho Mirage
1 I'atQn Vol.,
Area, Ar
(in2)
Depth of
Liquid
(in)
No.
Inner Ring :
113
4 1
78.54 Test By:
FDC
USCS Class:
Annular Ring :
339
4.1 2
176.7
Water Table Depth:
50 ft.
Penetration of Rings into Soil (in.):
Inner:
3 in
Outter:
7 in
)ate of Test:
3/1/23
Liquid Use Water
iH:
7.5 Gound Temp (°F):
58 at Depth:
4'
Liquid Level Maintained by using:
( ) Flow Valve ( ) Float Valve ( X ) Marriotte Tube ( ) Other:
Additional Comments:
Depth Below Surface = 4'
Time Interval
Time
(hr:min)
At (min)
& Total
Inner Ring
Annular Ring
Liquid
p
°F
Infiltration Rate, I**
Remarks
Elev.,
Elev.,
H (in)
AH
(in) &
Elev.,
H (in)
AH (in)
&
inner
in/hr
Outer
in/hr
1 - Start
14:00
5 0.75
2.00 1.00
2.75 58.00
16.68 17.20
End
14:05
5 2.75
157.08
3.75 485.93
58.00 2
- Start
14:05
10 2.75
3.75 3.75
5.25 59.00
15.64 16.42
End
14:15
15 6.50
294.53
9.00 927.68
59.00 3
- Start
14:15
15 6.50
5.25 9.00
7.00 60.00
14.60 14.59
End
14:30
30 11.75
412.34
16.00 1236.90
60.00 4
- Start
14:30
30 2.00
9.00 1.50
12.25 60.00
12.51 12.77
Refilled Tubes
End
15:00
60 11.00
706.86
13.75 2164.58
60.00 5
- Start
15:00
30 1.00
8.75 2.00
12.25 60.00
12.16 12.77
Refilled Tubes
End
15:30
90 9.75
687.23
14.25 2164.58
61.00 6
- Start
15:30
30 0.50
8.00 1.50
11.75 61.00
11.12 12.25
Refilled Tubes
End
16:00
120
8.50 628.32
13.25 2076.23
62.00 7
- Start
16:00
30 8.50
6.50 1.00
10.00 62.00
9.04 10.42
End
16:30
150
15.00 510.51
11.00 1767.00
63.00 8
- Start
16:30
30 1.00
6.25 0.00
8.50 63.00
8.69 8'86
Refilled Tubes
End
16:30
180
7.25 490.88
8.50 1501.95
63.00 9
- Start
16:30
30 7.25
5.75 8.50
7.50 63.00
7.99 7.82
End
17:00
210
13.00 451.61
16.00 1325.25
64.00 10
- Start
17:00
30 1.00
4.75 1.00
6.75 64.00
6.60 7.04
Refilled Tubes
End
17:30
240
5.75 373.07
7.75 1192.73
64.00 11
- Start
17:30
30 5.75
4.50 7.75
6.25 65.00
6.26 6.52
End
18:00
270
10.25 353.43
14.00 1104.38
65.00 12
- Start
18:00
30 1.00
4.50 2.50
6.50 64.00
6.26 6.78
Refilled Tubes
End
18:30
300
5.50 353.43
9.00 1148.55
64.00 13
- Start
18:30
30 5.50
4.50 9.00
6.50 63.00
6.26 6.78
End
19:00
330
10.00 353.43
15.50 1148.55
63.00 14
- Start
Use 4
5 in/hr
End
15 - Start
End
702
Project No. 23-0102-Inf
March 04, 2023
INFILTRATION TESTING FIELD LOG
Boring/Excavation Percolation Testing Field Log
Project Location
Earth Description:
Tested by:
Liquid Description:
R -'- -I M rl-ll-lu
Silty Gravelly Fine Sand w/cobbles
TB/MS
Time Interval Standard:
Tap Water
Start Date for Pre -Soak: 3/01/2023
Start Time for Standard:
Measurement Method:
11:00
Date: 03/01/23
Boring/test Number: B-1
Diameter of Boring: 8 -inch
Depth of Boring: 4' below grade
Depth to Invert of BMP's: 4' ae ow grace
Depth to Water Table: >50'
Water Remaining In Boring (Y/N): Yes
Standard Time Interval
Between Readings:
Measuring Tape
Depth to initial water Depth(d1): 96"
30 Minutes
Reading
Number
Time
Start/End
(hh:mm)
Elapsed
Tjme
Time
(mins)
Water
Drop
During
Standard
Time
Interval
AD
(inches)
Percolation
Rate for
Reading
(in/hr)
Soil Description/Notes/Comments
11:00
1 30
5.75 11.50
Medium to Coarse, Silty Gravelly Fine
11:30
Sand
12:00
2 30
4.25 8.50
12:30
13:00
3 30
4.0 8.0
13:30
14:00
4 30
2.25 4.50
14:30
15:00
5 30
2.25 4.50
15:305
Infiltration
Rate
4.50 In/Hr.
Use 4.5 In/Hr.
703
VOL
❑❑❑E IJI❑ MIT P0 -1000U
❑❑ap❑❑ P❑❑ El VI: ❑❑IE❑JP ❑ ❑.CI®
❑❑❑❑
❑a❑ ❑ ®P❑❑❑❑❑
PRELIMINARY
HYDROLOGY STUDY
AND
HYDRAULICS REPORT
FOR
TENTATIVE TRACT MAP 38636
CITY OF RANCHO MIRAGE
PREPARED BY:
S.D. ENGINEERING AND ASSOCIATES
242 E. Airport Drive, Ste 212
San Bernardino, Ca. 92408
(909) 884-7090
Email: [email protected]
INTRODUCTION
STUDY LOCATION:
This study area consists of approximately 5.04 acres of land with a single Family residential house located at the northeast corner of Ginger Rogers Road and Landy Lane in the City of Rancho Mirage.
The proposed project is a 9 -lot Tract Homes Subdivision. The site may be accessed via Bob Hope Drive south from from Freeway 10, thence east on Ginger Rogers Road to the project site.
REPORT OBJECTIVE:
The entire area of this project will be developed as a 9 -lot Tract Homes. The objective of this report is to determine the basic hydrologic response of the proposed development to both onsite and offsite storm runoff and to establish storm drain facility design criteria for this localized unit for review by the City of Rancho Mirage. The project is in a Very Low Density Residential Zoning HYDROLOGY METHODOLOGY:
The rational method hydrology system and the unit hydrograph method system of the Riverside County Flood Control and Water Conservation District Hydrology Manual dated April, 1978 will be used in the analysis of the subject site to satisfy the requirements of the City of Rancho Mirage.
SUMMARY:
The project study area is approximately 5.04 acres of land with an existing single family residential house to be demolished and to be replaced with 9 -lots Tract Homes. The project is small enough to be classified as a small project . The existing terrain has a drainage pattern from the northeast to the southwest. The drainage pattern will remain the same for the post development condition.
The project site is surrounded on the west by Landy Lane and will be improved with sidewalk, curb and gutter and therefore it will not have significant impact to the project.
On the south side is Ginger Rogers Road and will be improved with sidewalk, curb and gutter, and therefore it will not have significant impact to the project.
To the east and north sides are existing tract homes development with their own drainage system and separated by block walls, therefore they will not have significant impact to the project site.
There will be a short onsite private road that runs north and south and drains from north to south, There is a proposed retention/infiltration basin at the south end of the proposed road to treat runoff before draining to the City storm drain system to satisfy the WQMP requirements. This basin also used to mitigate any increase of runoff from predevelopment to post development conditions if there are any.
The site is in Soil Group inside Riverside -East Soil Group Map.
Onsite storm runoff are calculated before and after development conditions for 10 -year and 100 -year frequencies to ensure that the site is not flooded during the 100 -year storm. 706
Frequency
Predevlopement
Flow (cfs)
Post
Development
Flow (cfs)
Increase of
flow (cfs)
Predevelopment
Volume, Ac -Ft
Post Development
Volume, Ac -Ft
Q10
1.14 4.22
0.08 Q100
9.90 11.30
1.40 0.7520
0.5484
Based on the Unit Hydrograph method, the 100 -year predevelopment volume is 0.7520 Ac -Ft. and the post development generated volume is 0.5484 Ac -Ft. with a decrease of 0.2036 Ac -Ft., therefore no further mitigation is necessary.
The Infiltration basin has a total capacity of 5,161 cf with a required volume of 1,685 c.f.
WQMP RETENTION VOLUME
Volume Recuired (cf)
Volume Provided (cf)
1,685
5,161
The proposed 16" drain line has a capacity of 11.67 cfs which is more than the calculated flow of
11.30 cfs.
Street depth calculations for the proposed private street show that the street section can adequately handle the expected flow of 11.30 cfs.
The proposed street catch basin inlet opening of 4' wide is more than adequate to handle the calculated street flow.
CONCLUSION:
This Preliminary Hydrology and Hydraulics Report concludes that the proposed project is safe and feasible from Hydrology and Drainage standpoint.
707
❑❑❑❑❑ Y ❑ ❑ ❑R❑ ❑❑ ❑ED ❑E!' DR❑� _ �
*
*
Inside Diameter
( 16.00 in.)
*
*
*
* *
A A A A A A A A A A A A A A A A A A A A A
*
*
*
Water
*
*
*
*
L
E
15.01 in.)
1.251 ft.)
Circular Channel Section
Flowrate
Velocity
Pipe Diameter
Depth of Flow
Depth of Flow
Critical Depth
Depth/Diameter (D/d)
Slope of Pipe
X -Sectional Area
v
11.673 CFS >11.30 CFS OK
8.581 fps
16.000 inches
15.008 inches
1.251 feet
1.262 feet
0.938
2.000 %
1.360 sq. ft
768
Riverside County Rational Hydrology Program
CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2005 Version 7.1 Rational Hydrology Study Date: 04/28/23 File:MIRAGEl.out 10 -YEAR, PREDEVELOPMENT
TTM 38636
********* Hydrology Study Control Information ********** English (in -lb) Units used in input data file
Program License Serial Number 6260
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District 1978 hydrology manual
Storm event (year) = 10.00 Antecedent Moisture Condition = 2 Standard intensity -duration curves data (Plate D-4.1)
For the [ Cathedral City ] area used.
10 year storm 10 minute intensity = 2.770(In/Hr)
10 year storm 60 minute intensity = 0.980(In/Hr)
100 year storm 10 minute intensity = 4.520(In/Hr)
100 year storm 60 minute intensity = 1.600(In/Hr)
Storm event year = 10.0
Calculated rainfall intensity data:
1 hour intensity = 0.980(In/Hr)
Slope of intensity duration curve = 0.5800
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.000 to Point/Station 2.000 **** INITIAL AREA EVALUATION
Initial area flow distance = 686.000(Ft.)
Top (of initial area) elevation = 328.800(Ft.)
Bottom (of initial area) elevation = 323.000(Ft.)
Difference in elevation = 5.800(Ft.)
Slope = 0.00845 s(percent)= 0.85
TC = k(0.480)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 16.996 min.
Rainfall intensity = 2.037(In/Hr) for a 10.0 year storm SINGLE FAMILY (1 Acre Lot)
Runoff Coefficient = 0.481
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 32.00
Pervious area fraction = 0.800; Impervious fraction = 0.200 Initial subarea runoff = 4.135(CFS)
Total initial stream area = 4.220(Ac.)
Pervious area fraction = 0.800
End of computations, total study area = 4.22 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Area averaged pervious area fraction(Ap) = 0.800
Area averaged RI index number = 32.0
769
Riverside County Rational Hydrology Program
CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2005 Version 7.1 Rational Hydrology Study Date: 04/28/23 File:MIRAGE2.out 100 -YEAR, PREVELOPMENT
TTM 38636
********* Hydrology Study Control Information ********** English (in -lb) Units used in input data file
Program License Serial Number 6260
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District 1978 hydrology manual
Storm event (year) = 100.00 Antecedent Moisture Condition = 3 Standard intensity -duration curves data (Plate D-4.1)
For the [ Cathedral City ] area used.
10 year storm 10 minute intensity = 2.770(In/Hr)
10 year storm 60 minute intensity = 0.980(In/Hr)
100 year storm 10 minute intensity = 4.520(In/Hr)
100 year storm 60 minute intensity = 1.600(In/Hr)
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.600(In/Hr)
Slope of intensity duration curve = 0.5800
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station
**** INITIAL AREA EVALUATION
****
1.000 to Point/Station 2.000
Initial area flow distance = 686.000(Ft.)
Top (of initial area) elevation = 328.800(Ft.)
Bottom (of initial area) elevation = 323.000(Ft.)
Difference in elevation = 5.800(Ft.)
Slope = 0.00845 s(percent)= 0.85
TC = k(0.480)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 16.996 min.
Rainfall intensity = 3.325(In/Hr) for a 100.0 year storm SINGLE FAMILY (1 Acre Lot)
Runoff Coefficient = 0.706
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 3) = 52.00
Pervious area fraction = 0.800; Impervious fraction = 0.200 Initial subarea runoff = 9.900(CFS)
Total initial stream area = 4.220(Ac.)
Pervious area fraction = 0.800
End of computations, total study area = 4.22 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Area averaged pervious area fraction(Ap) = 0.800
Area averaged RI index number = 32.0
7 0
Riverside County Rational Hydrology Program
CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2005 Version 7.1 Rational Hydrology Study Date: 04/28/23 File:MIRAGE3.out 10 -YEAR, POST DEVELOPMENT
TTM 38636
********* Hydrology Study Control Information ********** English (in -lb) Units used in input data file
Program License Serial Number 6260
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District 1978 hydrology manual
Storm event (year) = 10.00 Antecedent Moisture Condition = 2 Standard intensity -duration curves data (Plate D-4.1)
For the [ Cathedral City ] area used.
10 year storm 10 minute intensity = 2.770(In/Hr)
10 year storm 60 minute intensity = 0.980(In/Hr)
100 year storm 10 minute intensity = 4.520(In/Hr)
100 year storm 60 minute intensity = 1.600(In/Hr)
Storm event year = 10.0
Calculated rainfall intensity data:
1 hour intensity = 0.980(In/Hr)
Slope of intensity duration curve = 0.5800
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station
**** INITIAL AREA EVALUATION ****
Initial area flow distance = 682.000(Ft.)
Top (of initial area) elevation = 328.800(Ft.)
Bottom (of initial area) elevation = 324.000(Ft.)
Difference in elevation = 4.800(Ft.)
Slope = 0.00704 s(percent)= 0.70
TC = k(0.420)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 15.391 min.
Rainfall intensity = 2.157(In/Hr) for a 10.0 year storm SINGLE FAMILY (1/2 Acre Lot)
Runoff Coefficient = 0.593
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 32.00
Pervious area fraction = 0.600; Impervious fraction = 0.400 Initial subarea runoff = 5.403(CFS)
Total initial stream area = 4.220(Ac.)
Pervious area fraction = 0.600
End of computations, total study area = 4.22 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
1.000 to Point/Station 2.000
Area averaged pervious area fraction(Ap) = 0.600
Area averaged RI index number = 32.0
711
Riverside County Rational Hydrology Program
CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2005 Version 7.1 Rational Hydrology Study Date: 04/28/23 File:MIRAGE4.out 100 -YEAR, POST DEVELOPMENT
TTM 38636
********* Hydrology Study Control Information ********** English (in -lb) Units used in input data file
Program License Serial Number 6260
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District 1978 hydrology manual
Storm event (year) = 100.00 Antecedent Moisture Condition = 3 Standard intensity -duration curves data (Plate D-4.1)
For the [ Cathedral City ] area used.
10 year storm 10 minute intensity = 2.770(In/Hr)
10 year storm 60 minute intensity = 0.980(In/Hr)
100 year storm 10 minute intensity = 4.520(In/Hr)
100 year storm 60 minute intensity = 1.600(In/Hr)
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.600(In/Hr)
Slope of intensity duration curve = 0.5800
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station
**** INITIAL AREA EVALUATION ****
Initial area flow distance = 682.000(Ft.)
Top (of initial area) elevation = 328.800(Ft.)
Bottom (of initial area) elevation = 324.000(Ft.)
Difference in elevation = 4.800(Ft.)
Slope = 0.00704 s(percent)= 0.70
TC = k(0.420)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 15.391 min.
Rainfall intensity = 3.522(In/Hr) for a 100.0 year storm SINGLE FAMILY (1/2 Acre Lot)
Runoff Coefficient = 0.760
Decimal fraction soil group A = 1.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 3) = 52.00
Pervious area fraction = 0.600; Impervious fraction = 0.400 Initial subarea runoff = 11.299(CFS)
Total initial stream area = 4.220(Ac.)
Pervious area fraction = 0.600
End of computations, total study area = 4.22 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
1.000 to Point/Station 2.000
Area averaged pervious area fraction(Ap) = 0.600
Area averaged RI index number = 32.0
7i2
Unit H y d r o g r a p h Analysis
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2008, Version 8.1 Study date 05/02/23 File: MIRAGE824100.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6260
English (in -lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
UNIT HYDROGRAPH
100 -YEAR POST DEVELOPMENT
TTM 38636
RANCHO MIRAGE
Drainage Area = 4.22(Ac.) = 0.007 Sq. Mi.
Drainage Area for Depth -Area Areal Adjustment = 4.22(Ac.) = 0.007 Sq. Mi.
Length along longest watercourse = 682.00(Ft.)
Length along longest watercourse measured to centroid = 250.00(Ft.) Length along longest watercourse = 0.129 Mi.
Length along longest watercourse measured to centroid = 0.047 Mi.
Difference in elevation = 4.80(Ft.)
Slope along watercourse = 37.1613 Ft./Mi.
Average Manning's 'N' = 0.015
Lag time = 0.026 Hr.
Lag time = 1.57 Min.
25% of lag time = 0.39 Min.
40% of lag time = 0.63 Min.
Unit time = 5.00 Min.
Duration of storm = 24 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:
Area (Ac . ) [1]
4.22 Rainfall(In)[2] Weighting[1*2]
1.21 5.11
100 YEAR Area rainfall data:
Area (Ac. ) [1]
4.22 Rainfall(In)[2] Weighting[1*2]
4.73 19.96
STORM EVENT (YEAR) = 100.00
Area Averaged 2 -Year Rainfall = 1.210(In)
Area Averaged 100 -Year Rainfall = 4.730(In)
713
Point rain (area averaged) = 4.730(In)
Areal adjustment factor = 100.00 %
Adjusted average point rain = 4.730(In)
Sub -Area Data:
Area(Ac.) Runoff Index Impervious %
4.220 32.00 0.280
Total Area Entered = 4.22(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC -3 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)
32.0 52.0 0.552 0.280 0.413 1.000 0.413
Sum (F) = 0.413
Area averaged mean soil loss (F) (In/Hr) = 0.413
Minimum soil loss rate ((In/Hr)) = 0.206
(for 24 hour storm duration)
Soil low loss rate (decimal) = 0.680
Unit Hydrograph
DESERT S -Curve
Unit Hydrograph Data
Unit time period Time % of lag Distribution Unit Hydrograph (hrs)
Graph % (CFS)
1 0.083
2 0.167
3 0.250
319.139
638.278
957.417
58.131
37.534
4.335
Sum = 100.000 Sum=
2.472
1.596
0.184
4.253
The following loss rate calculations reflect use of the minimum calculated loss
rate subtracted from the Storm Rain to produce the maximum Effective Rain value
Unit Time Pattern Storm Rain
(Hr.) Percent (In/Hr)
1 0.08 0.07 0.038
2 0.17 0.07 0.038
3 0.25 0.07 0.038
4 0.33 0.10 0.057
5 0.42 0.10 0.057
6 0.50 0.10 0.057
7 0.58 0.10 0.057
8 0.67 0.10 0.057
9 0.75 0.10 0.057
10 0.83 0.13 0.076
11 0.92 0.13 0.076
Loss rate(In./Hr)
Max I Low
0.731)
0.729)
0.726)
0.723)
0.720)
0.717)
0.715)
0.712)
0.709)
0.706)
0.703)
0.026
0.026
0.026
0.039
0.039
0.039
0.039
0.039
0.039
0.051
0.051
Effective
(In/Hr)
0.012
0.012
0.012
0.018
0.018
0.018
0.018
0.018
0.018
0.024
0.024
7 j� 4
12 1.00 0.13 0.076 ( 0.701) 0.051 0.024
13 1.08 0.10 0.057 ( 0.698) 0.039 0.018
14 1.17 0.10 0.057 ( 0.695) 0.039 0.018
15 1.25 0.10 0.057 ( 0.692) 0.039 0.018
16 1.33 0.10 0.057 ( 0.690) 0.039 0.018
17 1.42 0.10 0.057 ( 0.687) 0.039 0.018
18 1.50 0.10 0.057 ( 0.684) 0.039 0.018
19 1.58 0.10 0.057 ( 0.681) 0.039 0.018
20 1.67 0.10 0.057 ( 0.679) 0.039 0.018
21 1.75 0.10 0.057 ( 0.676) 0.039 0.018
22 1.83 0.13 0.076 ( 0.673) 0.051 0.024
23 1.92 0.13 0.076 ( 0.670) 0.051 0.024
24 2.00 0.13 0.076 ( 0.668) 0.051 0.024
25 2.08 0.13 0.076 ( 0.665) 0.051 0.024
26 2.17 0.13 0.076 ( 0.662) 0.051 0.024
27 2.25 0.13 0.076 ( 0.660) 0.051 0.024
28 2.33 0.13 0.076 ( 0.657) 0.051 0.024
29 2.42 0.13 0.076 ( 0.654) 0.051 0.024
30 2.50 0.13 0.076 ( 0.652) 0.051 0.024
31 2.58 0.17 0.095 ( 0.649) 0.064 0.030
32 2.67 0.17 0.095 ( 0.646) 0.064 0.030
33 2.75 0.17 0.095 ( 0.644) 0.064 0.030
34 2.83 0.17 0.095 ( 0.641) 0.064 0.030
35 2.92 0.17 0.095 ( 0.638) 0.064 0.030
36 3.00 0.17 0.095 ( 0.636) 0.064 0.030
37 3.08 0.17 0.095 ( 0.633) 0.064 0.030
38 3.17 0.17 0.095 ( 0.630) 0.064 0.030
39 3.25 0.17 0.095 ( 0.628) 0.064 0.030
40 3.33 0.17 0.095 ( 0.625) 0.064 0.030
41 3.42 0.17 0.095 ( 0.623) 0.064 0.030
42 3.50 0.17 0.095 ( 0.620) 0.064 0.030
43 3.58 0.17 0.095 ( 0.617) 0.064 0.030
44 3.67 0.17 0.095 ( 0.615) 0.064 0.030
45 3.75 0.17 0.095 ( 0.612) 0.064 0.030
46 3.83 0.20 0.114 ( 0.610) 0.077 0.036
47 3.92 0.20 0.114 ( 0.607) 0.077 0.036
48 4.00 0.20 0.114 ( 0.604) 0.077 0.036
49 4.08 0.20 0.114 ( 0.602) 0.077 0.036
50 4.17 0.20 0.114 ( 0.599) 0.077 0.036
51 4.25 0.20 0.114 ( 0.597) 0.077 0.036
52 4.33 0.23 0.132 ( 0.594) 0.090 0.042
53 4.42 0.23 0.132 ( 0.592) 0.090 0.042
54 4.50 0.23 0.132 ( 0.589) 0.090 0.042
55 4.58 0.23 0.132 ( 0.587) 0.090 0.042
56 4.67 0.23 0.132 ( 0.584) 0.090 0.042
57 4.75 0.23 0.132 ( 0.582) 0.090 0.042
58 4.83 0.27 0.151 ( 0.579) 0.103 0.048
59 4.92 0.27 0.151 ( 0.577) 0.103 0.048
60 5.00 0.27 0.151 ( 0.574) 0.103 0.048
61 5.08 0.20 0.114 ( 0.572) 0.077 0.036
62 5.17 0.20 0.114 ( 0.569) 0.077 0.036
63 5.25 0.20 0.114 ( 0.567) 0.077 0.036
64 5.33 0.23 0.132 ( 0.564) 0.090 0.042
65 5.42 0.23 0.132 ( 0.562) 0.090 0.042
71-15
66 5.50 0.23 0.132 ( 0.559) 0.090 0.042
67 5.58 0.27 0.151 ( 0.557) 0.103 0.048
68 5.67 0.27 0.151 ( 0.554) 0.103 0.048
69 5.75 0.27 0.151 ( 0.552) 0.103 0.048
70 5.83 0.27 0.151 ( 0.549) 0.103 0.048
71 5.92 0.27 0.151 ( 0.547) 0.103 0.048
72 6.00 0.27 0.151 ( 0.545) 0.103 0.048
73 6.08 0.30 0.170 ( 0.542) 0.116 0.054
74 6.17 0.30 0.170 ( 0.540) 0.116 0.054
75 6.25 0.30 0.170 ( 0.537) 0.116 0.054
76 6.33 0.30 0.170 ( 0.535) 0.116 0.054
77 6.42 0.30 0.170 ( 0.533) 0.116 0.054
78 6.50 0.30 0.170 ( 0.530) 0.116 0.054
79 6.58 0.33 0.189 ( 0.528) 0.129 0.061
80 6.67 0.33 0.189 ( 0.525) 0.129 0.061
81 6.75 0.33 0.189 ( 0.523) 0.129 0.061
82 6.83 0.33 0.189 ( 0.521) 0.129 0.061
83 6.92 0.33 0.189 ( 0.518) 0.129 0.061
84 7.00 0.33 0.189 ( 0.516) 0.129 0.061
85 7.08 0.33 0.189 ( 0.514) 0.129 0.061
86 7.17 0.33 0.189 ( 0.511) 0.129 0.061
87 7.25 0.33 0.189 ( 0.509) 0.129 0.061
88 7.33 0.37 0.208 ( 0.507) 0.142 0.067
89 7.42 0.37 0.208 ( 0.504) 0.142 0.067
90 7.50 0.37 0.208 ( 0.502) 0.142 0.067
91 7.58 0.40 0.227 ( 0.500) 0.154 0.073
92 7.67 0.40 0.227 ( 0.497) 0.154 0.073
93 7.75 0.40 0.227 ( 0.495) 0.154 0.073
94 7.83 0.43 0.246 ( 0.493) 0.167 0.079
95 7.92 0.43 0.246 ( 0.491) 0.167 0.079
96 8.00 0.43 0.246 ( 0.488) 0.167 0.079
97 8.08 0.50 0.284 ( 0.486) 0.193 0.091
98 8.17 0.50 0.284 ( 0.484) 0.193 0.091
99 8.25 0.50 0.284 ( 0.482) 0.193 0.091
100 8.33 0.50 0.284 ( 0.479) 0.193 0.091
101 8.42 0.50 0.284 ( 0.477) 0.193 0.091
102 8.50 0.50 0.284 ( 0.475) 0.193 0.091
103 8.58 0.53 0.303 ( 0.473) 0.206 0.097
104 8.67 0.53 0.303 ( 0.470) 0.206 0.097
105 8.75 0.53 0.303 ( 0.468) 0.206 0.097
106 8.83 0.57 0.322 ( 0.466) 0.219 0.103
107 8.92 0.57 0.322 ( 0.464) 0.219 0.103
108 9.00 0.57 0.322 ( 0.462) 0.219 0.103
109 9.08 0.63 0.359 ( 0.459) 0.244 0.115
110 9.17 0.63 0.359 ( 0.457) 0.244 0.115
111 9.25 0.63 0.359 ( 0.455) 0.244 0.115
112 9.33 0.67 0.378 ( 0.453) 0.257 0.121
113 9.42 0.67 0.378 ( 0.451) 0.257 0.121
114 9.50 0.67 0.378 ( 0.448) 0.257 0.121
115 9.58 0.70 0.397 ( 0.446) 0.270 0.127
116 9.67 0.70 0.397 ( 0.444) 0.270 0.127
117 9.75 0.70 0.397 ( 0.442) 0.270 0.127
118 9.83 0.73 0.416 ( 0.440) 0.283 0.133
119 9.92 0.73 0.416 ( 0.438) 0.283 0.133
74-6
120 10.00 0.73 0.416 ( 0.436) 0.283 0.133
121 10.08 0.50 0.284 ( 0.434) 0.193 0.091
122 10.17 0.50 0.284 ( 0.431) 0.193 0.091
123 10.25 0.50 0.284 ( 0.429) 0.193 0.091
124 10.33 0.50 0.284 ( 0.427) 0.193 0.091
125 10.42 0.50 0.284 ( 0.425) 0.193 0.091
126 10.50 0.50 0.284 ( 0.423) 0.193 0.091
127 10.58 0.67 0.378 ( 0.421) 0.257 0.121
128 10.67 0.67 0.378 ( 0.419) 0.257 0.121
129 10.75 0.67 0.378 ( 0.417) 0.257 0.121
130 10.83 0.67 0.378 ( 0.415) 0.257 0.121
131 10.92 0.67 0.378 ( 0.413) 0.257 0.121
132 11.00 0.67 0.378 ( 0.411) 0.257 0.121
133 11.08 0.63 0.359 ( 0.409) 0.244 0.115
134 11.17 0.63 0.359 ( 0.407) 0.244 0.115
135 11.25 0.63 0.359 ( 0.405) 0.244 0.115
136 11.33 0.63 0.359 ( 0.403) 0.244 0.115
137 11.42 0.63 0.359 ( 0.401) 0.244 0.115
138 11.50 0.63 0.359 ( 0.399) 0.244 0.115
139 11.58 0.57 0.322 ( 0.397) 0.219 0.103
140 11.67 0.57 0.322 ( 0.395) 0.219 0.103
141 11.75 0.57 0.322 ( 0.393) 0.219 0.103
142 11.83 0.60 0.341 ( 0.391) 0.232 0.109
143 11.92 0.60 0.341 ( 0.389) 0.232 0.109
144 12.00 0.60 0.341 ( 0.387) 0.232 0.109
145 12.08 0.83 0.473 ( 0.385) 0.322 0.151
146 12.17 0.83 0.473 ( 0.383) 0.322 0.151
147 12.25 0.83 0.473 ( 0.381) 0.322 0.151
148 12.33 0.87 0.492 ( 0.379) 0.335 0.157
149 12.42 0.87 0.492 ( 0.377) 0.335 0.157
150 12.50 0.87 0.492 ( 0.376) 0.335 0.157
151 12.58 0.93 0.530 ( 0.374) 0.360 0.170
152 12.67 0.93 0.530 ( 0.372) 0.360 0.170
153 12.75 0.93 0.530 ( 0.370) 0.360 0.170
154 12.83 0.97 0.549 0.368 ( 0.373) 0.181
155 12.92 0.97 0.549 0.366 ( 0.373) 0.182
156 13.00 0.97 0.549 0.364 ( 0.373) 0.184
157 13.08 1.13 0.643 0.363 ( 0.437) 0.281
158 13.17 1.13 0.643 0.361 ( 0.437) 0.283
159 13.25 1.13 0.643 0.359 ( 0.437) 0.284
160 13.33 1.13 0.643 0.357 ( 0.437) 0.286
161 13.42 1.13 0.643 0.355 ( 0.437) 0.288
162 13.50 1.13 0.643 0.353 ( 0.437) 0.290
163 13.58 0.77 0.435 ( 0.352) 0.296 0.139
164 13.67 0.77 0.435 ( 0.350) 0.296 0.139
165 13.75 0.77 0.435 ( 0.348) 0.296 0.139
166 13.83 0.77 0.435 ( 0.346) 0.296 0.139
167 13.92 0.77 0.435 ( 0.344) 0.296 0.139
168 14.00 0.77 0.435 ( 0.343) 0.296 0.139
169 14.08 0.90 0.511 0.341 ( 0.347) 0.170
170 14.17 0.90 0.511 0.339 ( 0.347) 0.172
171 14.25 0.90 0.511 0.337 ( 0.347) 0.173
172 14.33 0.87 0.492 ( 0.336) 0.335 0.157
173 14.42 0.87 0.492 0.334 ( 0.335) 0.158
7147
174 14.50 0.87 0.492 0.332 ( 0.335) 0.160
175 14.58 0.87 0.492 0.331 ( 0.335) 0.161
176 14.67 0.87 0.492 0.329 ( 0.335) 0.163
177 14.75 0.87 0.492 0.327 ( 0.335) 0.165
178 14.83 0.83 0.473 ( 0.326) 0.322 0.151
179 14.92 0.83 0.473 ( 0.324) 0.322 0.151
180 15.00 0.83 0.473 ( 0.322) 0.322 0.151
181 15.08 0.80 0.454 ( 0.321) 0.309 0.145
182 15.17 0.80 0.454 ( 0.319) 0.309 0.145
183 15.25 0.80 0.454 ( 0.317) 0.309 0.145
184 15.33 0.77 0.435 ( 0.316) 0.296 0.139
185 15.42 0.77 0.435 ( 0.314) 0.296 0.139
186 15.50 0.77 0.435 ( 0.312) 0.296 0.139
187 15.58 0.63 0.359 ( 0.311) 0.244 0.115
188 15.67 0.63 0.359 ( 0.309) 0.244 0.115
189 15.75 0.63 0.359 ( 0.308) 0.244 0.115
190 15.83 0.63 0.359 ( 0.306) 0.244 0.115
191 15.92 0.63 0.359 ( 0.305) 0.244 0.115
192 16.00 0.63 0.359 ( 0.303) 0.244 0.115
193 16.08 0.13 0.076 ( 0.301) 0.051 0.024
194 16.17 0.13 0.076 ( 0.300) 0.051 0.024
195 16.25 0.13 0.076 ( 0.298) 0.051 0.024
196 16.33 0.13 0.076 ( 0.297) 0.051 0.024
197 16.42 0.13 0.076 ( 0.295) 0.051 0.024
198 16.50 0.13 0.076 ( 0.294) 0.051 0.024
199 16.58 0.10 0.057 ( 0.292) 0.039 0.018
200 16.67 0.10 0.057 ( 0.291) 0.039 0.018
201 16.75 0.10 0.057 ( 0.289) 0.039 0.018
202 16.83 0.10 0.057 ( 0.288) 0.039 0.018
203 16.92 0.10 0.057 ( 0.286) 0.039 0.018
204 17.00 0.10 0.057 ( 0.285) 0.039 0.018
205 17.08 0.17 0.095 ( 0.284) 0.064 0.030
206 17.17 0.17 0.095 ( 0.282) 0.064 0.030
207 17.25 0.17 0.095 ( 0.281) 0.064 0.030
208 17.33 0.17 0.095 ( 0.279) 0.064 0.030
209 17.42 0.17 0.095 ( 0.278) 0.064 0.030
210 17.50 0.17 0.095 ( 0.277) 0.064 0.030
211 17.58 0.17 0.095 ( 0.275) 0.064 0.030
212 17.67 0.17 0.095 ( 0.274) 0.064 0.030
213 17.75 0.17 0.095 ( 0.272) 0.064 0.030
214 17.83 0.13 0.076 ( 0.271) 0.051 0.024
215 17.92 0.13 0.076 ( 0.270) 0.051 0.024
216 18.00 0.13 0.076 ( 0.268) 0.051 0.024
217 18.08 0.13 0.076 ( 0.267) 0.051 0.024
218 18.17 0.13 0.076 ( 0.266) 0.051 0.024
219 18.25 0.13 0.076 ( 0.264) 0.051 0.024
220 18.33 0.13 0.076 ( 0.263) 0.051 0.024
221 18.42 0.13 0.076 ( 0.262) 0.051 0.024
222 18.50 0.13 0.076 ( 0.261) 0.051 0.024
223 18.58 0.10 0.057 ( 0.259) 0.039 0.018
224 18.67 0.10 0.057 ( 0.258) 0.039 0.018
225 18.75 0.10 0.057 ( 0.257) 0.039 0.018
226 18.83 0.07 0.038 ( 0.256) 0.026 0.012
227 18.92 0.07 0.038 ( 0.254) 0.026 0.012
7148
228 19.00 0.07 0.038 ( 0.253) 0.026 0.012
229 19.08 0.10 0.057 ( 0.252) 0.039 0.018
230 19.17 0.10 0.057 ( 0.251) 0.039 0.018
231 19.25 0.10 0.057 ( 0.250) 0.039 0.018
232 19.33 0.13 0.076 ( 0.248) 0.051 0.024
233 19.42 0.13 0.076 ( 0.247) 0.051 0.024
234 19.50 0.13 0.076 ( 0.246) 0.051 0.024
235 19.58 0.10 0.057 ( 0.245) 0.039 0.018
236 19.67 0.10 0.057 ( 0.244) 0.039 0.018
237 19.75 0.10 0.057 ( 0.243) 0.039 0.018
238 19.83 0.07 0.038 ( 0.242) 0.026 0.012
239 19.92 0.07 0.038 ( 0.241) 0.026 0.012
240 20.00 0.07 0.038 ( 0.240) 0.026 0.012
241 20.08 0.10 0.057 ( 0.239) 0.039 0.018
242 20.17 0.10 0.057 ( 0.237) 0.039 0.018
243 20.25 0.10 0.057 ( 0.236) 0.039 0.018
244 20.33 0.10 0.057 ( 0.235) 0.039 0.018
245 20.42 0.10 0.057 ( 0.234) 0.039 0.018
246 20.50 0.10 0.057 ( 0.233) 0.039 0.018
247 20.58 0.10 0.057 ( 0.232) 0.039 0.018
248 20.67 0.10 0.057 ( 0.231) 0.039 0.018
249 20.75 0.10 0.057 ( 0.231) 0.039 0.018
250 20.83 0.07 0.038 ( 0.230) 0.026 0.012
251 20.92 0.07 0.038 ( 0.229) 0.026 0.012
252 21.00 0.07 0.038 ( 0.228) 0.026 0.012
253 21.08 0.10 0.057 ( 0.227) 0.039 0.018
254 21.17 0.10 0.057 ( 0.226) 0.039 0.018
255 21.25 0.10 0.057 ( 0.225) 0.039 0.018
256 21.33 0.07 0.038 ( 0.224) 0.026 0.012
257 21.42 0.07 0.038 ( 0.223) 0.026 0.012
258 21.50 0.07 0.038 ( 0.223) 0.026 0.012
259 21.58 0.10 0.057 ( 0.222) 0.039 0.018
260 21.67 0.10 0.057 ( 0.221) 0.039 0.018
261 21.75 0.10 0.057 ( 0.220) 0.039 0.018
262 21.83 0.07 0.038 ( 0.219) 0.026 0.012
263 21.92 0.07 0.038 ( 0.219) 0.026 0.012
264 22.00 0.07 0.038 ( 0.218) 0.026 0.012
265 22.08 0.10 0.057 ( 0.217) 0.039 0.018
266 22.17 0.10 0.057 ( 0.216) 0.039 0.018
267 22.25 0.10 0.057 ( 0.216) 0.039 0.018
268 22.33 0.07 0.038 ( 0.215) 0.026 0.012
269 22.42 0.07 0.038 ( 0.214) 0.026 0.012
270 22.50 0.07 0.038 ( 0.214) 0.026 0.012
271 22.58 0.07 0.038 ( 0.213) 0.026 0.012
272 22.67 0.07 0.038 ( 0.213) 0.026 0.012
273 22.75 0.07 0.038 ( 0.212) 0.026 0.012
274 22.83 0.07 0.038 ( 0.211) 0.026 0.012
275 22.92 0.07 0.038 ( 0.211) 0.026 0.012
276 2.3.00 0.07 0.038 ( 0.210) 0.026 0.012
277 23.08 0.07 0.038 ( 0.210) 0.026 0.012
278 23.17 0.07 0.038 ( 0.209) 0.026 0.012
279 23.25 0.07 0.038 ( 0.209) 0.026 0.012
280 23.33 0.07 0.038 ( 0.209) 0.026 0.012
281 23.42 0.07 0.038 ( 0.208) 0.026 0.012
719
282 23.50 0.07 0.038 ( 0.208)
283 23.58 0.07 0.038 ( 0.207)
284 23.67 0.07 0.038 ( 0.207)
285 23.75 0.07 0.038 ( 0.207)
286 23.83 0.07 0.038 ( 0.207)
287 23.92 0.07 0.038 ( 0.206)
288 24.00 0.07 0.038 ( 0.206)
(Loss Rate Not Used)
Sum = 100.0
Flood volume = Effective rainfall 1.56(In)
times area
Total soil loss =
Total soil loss =
Total rainfall =
Flood volume =
Total soil loss =
4.2 (Ac.) / [ (In) / (Ft.) ] =
3.17(In)
1.115(Ac.Ft)
4.73(In)
23877.0 Cubic Feet
48579.4 Cubic Feet
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.012
0.012
0.012
0.012
0.012
0.012
0.012
Sum = 18.7
0.5(Ac.Ft)
Peak flow rate of this hydrograph = 1.230(CFS)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 24 - H O U R STORM
Runoff Hydrograph
Hydrograph in 5 Minute intervals ((CFS))
Time(h+m) Volume Ac.Ft Q(CFS) 0
2.5 5.0
7.5 10.0
0+ 5 0.0002 0.03 Q
0+10 0.0005 0.05 Q
0+15 0.0009 0.05 Q
0+20 0.0014 0.07 Q
0+25 0.0019 0.08 Q
0+30 0.0024 0.08 Q
0+35 0.0029 0.08 Q
0+40 0.0035 0.08 Q
0+45 0.0040 0.08 Q
0+50 0.0046 0.09 Q
0+55 0.0053 0.10 Q
1+ 0 0.0061 0.10 Q
1+ 5 0.0067 0.09 Q
1+10 0.0072 0.08 Q
1+15 0.0077 0.08 Q
1+20 0.0083 0.08 Q
1+25 0.0088 0.08 Q
1+30 0.0093 0.08 Q
1+35 0.0099 0.08 Q
1+40 0.0104 0.08 Q
1+45 0.0109 0.08 Q
1+50 0.0116 0.09 Q
1+55 0.0123 0.10 Q
2+ 0 0.0130 0.10 Q
2+ 5 0.0137 0.10 Q
2+10 0.0144 0.10 QV
7�0
2+15 0.0151 0.10 QV
2+20 0.0158 0.10 QV
2+25 0.0165 0.10 QV
2+30 0.0172 0.10 Qv
2+35 0.0181 0.12 QV
2+40 0.0189 0.13 QV
2+45 0.0198 0.13 QV
2+50 0.0207 0.13 QV
2+55 0.0216 0.13 QV
3+ 0 0.0225 0.13 QV
3+ 5 0.0234 0.13 QV
3+10 0.0243 0.13 QV
3+15 0.0251 0.13 QV
3+20 0.0260 0.13 QV
3+25 0.0269 0.13 QV
3+30 0.0278 0.13 Q V
3+35 0.0287 0.13 Q V
3+40 0.0296 0.13 Q v
3+45 0.0305 0.13 Q V
3+50 0.0315 0.14 Q V
3+55 0.0325 0.15 Q V
4+ 0 0.0336 0.15 Q V
4+ 5 0.0346 0.15 Q v
4+10 0.0357 0.15 Q V
4+15 0.0368 0.15 Q V
4+20 0.0379 0.17 Q V
4+25 0.0392 0.18 Q V
4+30 0.0404 0.18 Q v
4+35 0.0417 0.18 Q V
4+40 0.0429 0.18 Q V
4+45 0.0441 0.18 Q V
4+50 0.0455 0.20 Q V
4+55 0.0469 0.20 Q v
5+ 0 0.0483 0.21 Q V
5+ 5 0.0495 0.18 Q V
5+10 0.0506 0.16 Q V
5+15 0.0517 0.15 Q V
5+20 0.0528 0.17 Q v
5+25 0.0541 0.18 Q V
5+30 0.0553 0.18 Q v
5+35 0.0567 0.20 Q V
5+40 0.0581 0.20 Q V
5+45 0.0595 0.21 Q v
5+50 0.0609 0.21 Q V
5+55 0.0623 0.21 Q v
6+ 0 0.0637 0.21 Q V
6+ 5 0.0653 0.22 Q V
6+10 0.0669 0.23 Q V
6+15 0.0685 0.23 Q V
6+20 0.0701 0.23 Q V
6+25 0.0717 0.23 Q V
6+30 0.0732 0.23 Q V
6+35 0.0749 0.25 Q V
6+40 0.0767 0.26 IQ V
71 6+45 0.0785 0.26 Q V
6+50 0.0803 0.26 Q v
6+55 0.0820 0.26 Q V
7+ 0 0.0838 0.26 Q V
7+ 5 0.0856 0.26 Q V
7+10 0.0874 0.26 Q V
7+15 0.0891 0.26 Q V
7+20 0.0910 0.27 Q V
7+25 0.0930 0.28 Q V
7+30 0.0949 0.28 Q V
7+35 0.0970 0.30 Q v
7+40 0.0991 0.31 Q V
7+45 0.1012 0.31 Q V
7+50 0.1034 0.32 Q V
7+55 0.1057 0.33 Q V
8+ 0 0.1081 0.33 Q V
8+ 5 0.1106 0.36 Q V
8+10 0.1132 0.38 Q V
8+15 0.1159 0.39 Q V
8+20 0.1185 0.39 Q V
8+25 0.1212 0.39 Q V
8+30 0.1239 0.39 Q V
8+35 0.1266 0.40 Q V
8+40 0.1295 0.41 Q V
8+45 0.1323 0.41 Q V
8+50 0.1352 0.43 Q V
8+55 0.1382 0.44 Q V
9+ 0 0.1413 0.44 Q V
9+ 5 0.1445 0.47 Q V
9+10 0.1478 0.49 Q V
9+15 0.1512 0.49 Q V
9+20 0.1547 0.50 Q V
9+25 0.1582 0.51 Q V
9+30 0.1618 0.52 Q V
9+35 0.1654 0.53 Q V
9+40 0.1691 0.54 Q v
9+45 0.1729 0.54 Q V
9+50 0.1767 0.56 Q v
9+55 0.1806 0.57 Q v
10+ 0 0.1845 0.57 Q V
10+ 5 0.1877 0.46 Q V
10+10 0.1904 0.39 Q V
10+15 0.1931 0.39 Q V
10+20 0.1957 0.39 Q V
10+25 0.1984 0.39 Q V
10+30 0.2010 0.39 Q V
10+35 0.2042 0.46 Q V
10+40 0.2077 0.51 Q V
10+45 0.2113 0.52 Q V
10+50 0.2148 0.52 Q V
10+55 0.2184 0.52 Q V
11+ 0 0.2219 0.52 Q V
11+ 5 0.2254 0.50 Q V
11+10 0.2287 0.49 Q V
72 11+15 0.2321 0.49 Q
11+20 0.2355 0.49 Q
11+25 0.2389 0.49 Q
11+30 0.2422 0.49 Q
11+35 0.2454 0.46 Q
11+40 0.2484 0.44 Q
11+45 0.2514 0.44 Q
11+50 0.2546 0.45 Q
11+55 0.2577 0.46 Q
12+ 0 0.2609 0.46 Q
12+ 5 0.2649 0.57 Q
12+10 0.2692 0.64 Q
12+15 0.2737 0.64 Q
12+20 0.2782 0.66 Q
12+25 0.2828 0.67 Q
12+30 0.2874 0.67 Q
12+35 0.2922 0.70 Q
12+40 0.2972 0.72 Q
12+45 0.3022 0.72 Q
12+50 0.3073 0.75 Q
12+55 0.3126 0.77 Q
13+ 0 0.3180 0.78 Q
13+ 5 0.3251 1.02 Q
13+10 0.3332 1.18 Q
13+15 0.3415 1.21 Q
13+20 0.3499 1.21 Q
13+25 0.3583 1.22 Q
13+30 0.3668 1.23 Q
13+35 0.3727 0.86 Q
13+40 0.3770 0.62 Q
13+45 0.3810 0.59 Q
13+50 0.3851 0.59 Q
13+55 0.3892 0.59 Q
14+ 0 0.3933 0.59 Q
14+ 5 0.3979 0.67 Q
14+10 0.4028 0.72 Q
14+15 0.4079 0.73 Q
14+20 0.4127 0.70 Q
14+25 0.4174 0.67 Q
14+30 0.4220 0.68 Q
14+35 0.4267 0.68 Q
14+40 0.4315 0.69 Q
14+45 0.4363 0.70 Q
14+50 0.4409 0.67 Q
14+55 0.4453 0.65 Q
15+ 0 0.4497 0.64 Q
15+ 5 0.4541 0.63 Q
15+10 0.4583 0.62 Q
15+15 0.4626 0.62 Q
15+20 0.4668 0.60 Q
15+25 0.4708 0.59 Q
15+30 0.4749 0.59 Q
15+35 0.4786 0.53 Q
15+40 0.4820 0.49 Q
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
73 15+45 0.4854 0.49 IQ
15+50 0.4887 0.49 IQ
15+55 0.4921 0.49 IQ
16+ 0 0.4955 0.49 IQ
16+ 5 0.4973 0.26 IQ
16+10 0.4981 0.12 Q
16+15 0.4988 0.10 Q
16+20 0.4996 0.10 Q
16+25 0.5003 0.10 Q
16+30 0.5010 0.10 Q
16+35 0.5016 0.09 Q
16+40 0.5021 0.08 Q
16+45 0.5027 0.08 Q
16+50 0.5032 0.08 Q
16+55 0.5037 0.08 Q
17+ 0 0.5042 0.08 Q
17+ 5 0.5050 0.11 Q
17+10 0.5059 0.13 Q
17+15 0.5067 0.13 Q
17+20 0.5076 0.13 Q
17+25 0.5085 0.13 Q
17+30 0.5094 0.13 Q
17+35 0.5103 0.13 Q
17+40 0.5112 0.13 Q
17+45 0.5121 0.13 Q
17+50 0.5129 0.11 Q
17+55 0.5136 0.10 Q
18+ 0 0.5143 0.10 Q
18+ 5 0.5150 0.10 Q
18+10 0.5157 0.10 Q
18+15 0.5164 0.10 Q
18+20 0.5171 0.10 Q
18+25 0.5178 0.10 Q
18+30 0.5185 0.10 Q
18+35 0.5191 0.09 Q
18+40 0.5197 0.08 Q
18+45 0.5202 0.08 Q
18+50 0.5206 0.06 Q
18+55 0.5210 0.05 Q
19+ 0 0.5214 0.05 Q
19+ 5 0.5218 0.07 Q
19+10 0.5223 0.08 Q
19+15 0.5229 0.08 Q
19+20 0.5235 0.09 Q
19+25 0.5242 0.10 Q
19+30 0.5249 0.10 Q
19+35 0.5255 0.09 Q
19+40 0.5261 0.08 Q
19+45 0.5266 0.08 Q
19+50 0.5270 0.06 Q
19+55 0.5274 0.05 Q
20+ 0 0.5278 0.05 Q
20+ 5 0.5282 0.07 Q
20+10 0.5287 0.08 Q
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
7�4
20+15 0.5293 0.08 Q
20+20 0.5298 0.08 Q
20+25 0.5303 0.08 Q
20+30 0.5309 0.08 Q
20+35 0.5314 0.08 Q
20+40 0.5319 0.08 Q
20+45 0.5325 0.08 Q
20+50 0.5329 0.06 Q
20+55 0.5333 0.05 Q
21+ 0 0.5336 0.05 Q
21+ 5 0.5341 0.07 Q
21+10 0.5346 0.08 Q
21+15 0.5351 0.08 Q
21+20 0.5355 0.06 Q
21+25 0.5359 0.05 Q
21+30 0.5363 0.05 Q
21+35 0.5367 0.07 Q
21+40 0.5372 0.08 Q
21+45 0.5378 0.08 Q
21+50 0.5382 0.06 Q
21+55 0.5386 0.05 Q
22+ 0 0.5389 0.05 Q
22+ 5 0.5394 0.07 Q
22+10 0.5399 0.08 Q
22+15 0.5404 0.08 Q
22+20 0.5409 0.06 Q
22+25 0.5412 0.05 Q
22+30 0.5416 0.05 Q
22+35 0.5419 0.05 Q
22+40 0.5423 0.05 Q
22+45 0.5427 0.05 Q
22+50 0.5430 0.05 Q
22+55 0.5434 0.05 Q
23+ 0 0.5437 0.05 Q
23+ 5 0.5441 0.05 Q
23+10 0.5444 0.05 Q
23+15 0.5448 0.05 Q
23+20 0.5451 0.05 Q
23+25 0.5455 0.05 Q
23+30 0.5458 0.05 Q
23+35 0.5462 0.05 Q
23+40 0.5466 0.05 Q
23+45 0.5469 0.05 Q
23+50 0.5473 0.05 Q
23+55 0.5476 0.05 Q
24+ 0 0.5480 0.05 Q
24+ 5 0.5481 0.02 Q
24+10 0.5481 0.00 Q
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
7�5
Unit H y d r o g r a p h Analysis
Copyright (c) CIVILCADD/CIVILDESIGN, 1989 - 2008, Version 8.1 Study date 05/02/23 File: MIRAGE824100.out
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Riverside County Synthetic Unit Hydrology Method
RCFC & WCD Manual date - April 1978
Program License Serial Number 6260
English (in -lb) Input Units Used
English Rainfall Data (Inches) Input Values Used
English Units used in output format
UNIT HYDROGRAPH
100 -YEAR POST DEVELOPMENT
TTM 38636
RANCHO MIRAGE
Drainage Area = 4.22(Ac.) = 0.007 Sq. Mi.
Drainage Area for Depth -Area Areal Adjustment = 4.22(Ac.) = 0.007 Sq. Mi.
Length along longest watercourse = 682.00(Ft.)
Length along longest watercourse measured to centroid = 250.00(Ft.) Length along longest watercourse = 0.129 Mi.
Length along longest watercourse measured to centroid = 0.047 Mi.
Difference in elevation = 4.80(Ft.)
Slope along watercourse = 37.1613 Ft./Mi.
Average Manning's 'N' = 0.015
Lag time = 0.026 Hr.
Lag time = 1.57 Min.
25% of lag time = 0.39 Min.
40% of lag time = 0.63 Min.
Unit time = 5.00 Min.
Duration of storm = 24 Hour(s)
User Entered Base Flow = 0.00(CFS)
2 YEAR Area rainfall data:
Area (Ac . ) [1]
4.22 Rainfall(In)[2] Weighting[1*2]
1.21 5.11
100 YEAR Area rainfall data:
Area (Ac. ) [1]
4.22 Rainfall(In)[2] Weighting[1*2]
4.73 19.96
STORM EVENT (YEAR) = 100.00
Area Averaged 2 -Year Rainfall = 1.210(In)
Area Averaged 100 -Year Rainfall = 4.730(In)
76 Point rain (area averaged) = 4.730(In)
Areal adjustment factor = 100.00 %
Adjusted average point rain = 4.730(In)
Sub -Area Data:
Area(Ac.) Runoff Index Impervious %
4.220 32.00 0.280
Total Area Entered = 4.22(Ac.)
RI RI Infil. Rate Impervious Adj. Infil. Rate Area% F
AMC2 AMC -3 (In/Hr) (Dec.%) (In/Hr) (Dec.) (In/Hr)
32.0 52.0 0.552 0.280 0.413 1.000 0.413
Sum (F) = 0.413
Area averaged mean soil loss (F) (In/Hr) = 0.413
Minimum soil loss rate ((In/Hr)) = 0.206
(for 24 hour storm duration)
Soil low loss rate (decimal) 0.680
Unit Hydrograph
DESERT S -Curve
Unit Hydrograph Data
Unit time period Time % of lag Distribution Unit Hydrograph (hrs)
Graph % (CFS)
1 0.083
2 0.167
3 0.250
319.139
638.278
957.417
58.131
37.534
4.335
Sum = 100.000 Sum=
2.472
1.596
0.184
4.253
The following loss rate calculations reflect use of the minimum calculated loss
rate subtracted from the Storm Rain to produce the maximum Effective Rain value
Unit Time Pattern Storm Rain
(Hr.) Percent (In/Hr)
1 0.08 0.07 0.038
2 0.17 0.07 0.038
3 0.25 0.07 0.038
4 0.33 0.10 0.057
5 0.42 0.10 0.057
6 0.50 0.10 0.057
7 0.58 0.10 0.057
8 0.67 0.10 0.057
9 0.75 0.10 0.057
10 0.83 0.13 0.076
11 0.92 0.13 0.076
Loss rate(In./Hr)
Max I Low
0.731)
0.729)
0.726)
0.723)
0.720)
0.717)
0.715)
0.712)
0.709)
0.706)
0.703)
0.026
0.026
0.026
0.039
0.039
0.039
0.039
0.039
0.039
0.051
0.051
Effective
(In/Hr)
0.012
0.012
0.012
0.018
0.018
0.018
0.018
0.018
0.018
0.024
0.024
7�7
12 1.00 0.13 0.076 ( 0.701) 0.051 0.024
13 1.08 0.10 0.057 ( 0.698) 0.039 0.018
14 1.17 0.10 0.057 ( 0.695) 0.039 0.018
15 1.25 0.10 0.057 ( 0.692) 0.039 0.018
16 1.33 0.10 0.057 ( 0.690) 0.039 0.018
17 1.42 0.10 0.057 ( 0.687) 0.039 0.018
18 1.50 0.10 0.057 ( 0.684) 0.039 0.018
19 1.58 0.10 0.057 ( 0.681) 0.039 0.018
20 1.67 0.10 0.057 ( 0.679) 0.039 0.018
21 1.75 0.10 0.057 ( 0.676) 0.039 0.018
22 1.83 0.13 0.076 ( 0.673) 0.051 0.024
23 1.92 0.13 0.076 ( 0.670) 0.051 0.024
24 2.00 0.13 0.076 ( 0.668) 0.051 0.024
25 2.08 0.13 0.076 ( 0.665) 0.051 0.024
26 2.17 0.13 0.076 ( 0.662) 0.051 0.024
27 2.25 0.13 0.076 ( 0.660) 0.051 0.024
28 2.33 0.13 0.076 ( 0.657) 0.051 0.024
29 2.42 0.13 0.076 ( 0.654) 0.051 0.024
30 2.50 0.13 0.076 ( 0.652) 0.051 0.024
31 2.58 0.17 0.095 ( 0.649) 0.064 0.030
32 2.67 0.17 0.095 ( 0.646) 0.064 0.030
33 2.75 0.17 0.095 ( 0.644) 0.064 0.030
34 2.83 0.17 0.095 ( 0.641) 0.064 0.030
35 2.92 0.17 0.095 ( 0.638) 0.064 0.030
36 3.00 0.17 0.095 ( 0.636) 0.064 0.030
37 3.08 0.17 0.095 ( 0.633) 0.064 0.030
38 3.17 0.17 0.095 ( 0.630) 0.064 0.030
39 3.25 0.17 0.095 ( 0.628) 0.064 0.030
40 3.33 0.17 0.095 ( 0.625) 0.064 0.030
41 3.42 0.17 0.095 ( 0.623) 0.064 0.030
42 3.50 0.17 0.095 ( 0.620) 0.064 0.030
43 3.58 0.17 0.095 ( 0.617) 0.064 0.030
44 3.67 0.17 0.095 ( 0.615) 0.064 0.030
45 3.75 0.17 0.095 ( 0.612) 0.064 0.030
46 3.83 0.20 0.114 ( 0.610) 0.077 0.036
47 3.92 0.20 0.114 ( 0.607) 0.077 0.036
48 4.00 0.20 0.114 ( 0.604) 0.077 0.036
49 4.08 0.20 0.114 ( 0.602) 0.077 0.036
50 4.17 0.20 0.114 ( 0.599) 0.077 0.036
51 4.25 0.20 0.114 ( 0.597) 0.077 0.036
52 4.33 0.23 0.132 ( 0.594) 0.090 0.042
53 4.42 0.23 0.132 ( 0.592) 0.090 0.042
54 4.50 0.23 0.132 ( 0.589) 0.090 0.042
55 4.58 0.23 0.132 ( 0.587) 0.090 0.042
56 4.67 0.23 0.132 ( 0.584) 0.090 0.042
57 4.75 0.23 0.132 ( 0.582) 0.090 0.042
58 4.83 0.27 0.151 ( 0.579) 0.103 0.048
59 4.92 0.27 0.151 ( 0.577) 0.103 0.048
60 5.00 0.27 0.151 ( 0.574) 0.103 0.048
61 5.08 0.20 0.114 ( 0.572) 0.077 0.036
62 5.17 0.20 0.114 ( 0.569) 0.077 0.036
63 5.25 0.20 0.114 ( 0.567) 0.077 0.036
64 5.33 0.23 0.132 ( 0.564) 0.090 0.042
65 5.42 0.23 0.132 ( 0.562) 0.090 0.042
7�8
66 5.50 0.23 0.132 ( 0.559) 0.090 0.042
67 5.58 0.27 0.151 ( 0.557) 0.103 0.048
68 5.67 0.27 0.151 ( 0.554) 0.103 0.048
69 5.75 0.27 0.151 ( 0.552) 0.103 0.048
70 5.83 0.27 0.151 ( 0.549) 0.103 0.048
71 5.92 0.27 0.151 ( 0.547) 0.103 0.048
72 6.00 0.27 0.151 ( 0.545) 0.103 0.048
73 6.08 0.30 0.170 ( 0.542) 0.116 0.054
74 6.17 0.30 0.170 ( 0.540) 0.116 0.054
75 6.25 0.30 0.170 ( 0.537) 0.116 0.054
76 6.33 0.30 0.170 ( 0.535) 0.116 0.054
77 6.42 0.30 0.170 ( 0.533) 0.116 0.054
78 6.50 0.30 0.170 ( 0.530) 0.116 0.054
79 6.58 0.33 0.189 ( 0.528) 0.129 0.061
80 6.67 0.33 0.189 ( 0.525) 0.129 0.061
81 6.75 0.33 0.189 ( 0.523) 0.129 0.061
82 6.83 0.33 0.189 ( 0.521) 0.129 0.061
83 6.92 0.33 0.189 ( 0.518) 0.129 0.061
84 7.00 0.33 0.189 ( 0.516) 0.129 0.061
85 7.08 0.33 0.189 ( 0.514) 0.129 0.061
86 7.17 0.33 0.189 ( 0.511) 0.129 0.061
87 7.25 0.33 0.189 ( 0.509) 0.129 0.061
88 7.33 0.37 0.208 ( 0.507) 0.142 0.067
89 7.42 0.37 0.208 ( 0.504) 0.142 0.067
90 7.50 0.37 0.208 ( 0.502) 0.142 0.06.7
91 7.58 0.40 0.227 ( 0.500) 0.154 0.073
92 7.67 0.40 0.227 ( 0.497) 0.154 0.073
93 7.75 0.40 0.227 ( 0.495) 0.154 0.073
94 7.83 0.43 0.246 ( 0.493) 0.167 0.079
95 7.92 0.43 0.246 ( 0.491) 0.167 0.079
96 8.00 0.43 0.246 ( 0.488) 0.167 0.079
97 8.08 0.50 0.284 ( 0.486) 0.193 0.091
98 8.17 0.50 0.284 ( 0.484) 0.193 0.091
99 8.25 0.50 0.284 ( 0.482) 0.193 0.091
100 8.33 0.50 0.284 ( 0.479) 0.193 0.091
101 8.42 0.50 0.284 ( 0.477) 0.193 0.091
102 8.50 0.50 0.284 ( 0.475) 0.193 0.091
103 8.58 0.53 0.303 ( 0.473) 0.206 0.097
104 8.67 0.53 0.303 ( 0.470) 0.206 0.097
105 8.75 0.53 0.303 ( 0.468) 0.206 0.097
106 8.83 0.57 0.322 ( 0.466) 0.219 0.103
107 8.92 0.57 0.322 ( 0.464) 0.219 0.103
108 9.00 0.57 0.322 ( 0.462) 0.219 0.103
109 9.08 0.63 0.359 ( 0.459) 0.244 0.115
110 9.17 0.63 0.359 ( 0.457) 0.244 0.115
111 9.25 0.63 0.359 ( 0.455) 0.244 0.115
112 9.33 0.67 0.378 ( 0.453) 0.257 0.121
113 9.42 0.67 0.378 ( 0.451) 0.257 0.121
114 9.50 0.67 0.378 ( 0.448) 0.257 0.121
115 9.58 0.70 0.397 ( 0.446) 0.270 0.127
116 9.67 0.70 0.397 ( 0.444) 0.270 0.127
117 9.75 0.70 0.397 ( 0.442) 0.270 0.127
118 9.83 0.73 0.416 ( 0.440) 0.283 0.133
119 9.92 0.73 0.416 ( 0.438) 0.283 0.133
729
120 10.00 0.73 0.416 ( 0.436) 0.283 0.133
121 10.08 0.50 0.284 ( 0.434) 0.193 0.091
122 10.17 0.50 0.284 ( 0.431) 0.193 0.091
123 10.25 0.50 0.284 ( 0.429) 0.193 0.091
124 10.33 0.50 0.284 ( 0.427) 0.193 0.091
125 10.42 0.50 0.284 ( 0.425) 0.193 0.091
126 10.50 0.50 0.284 ( 0.423) 0.193 0.091
127 10.58 0.67 0.378 ( 0.421) 0.257 0.121
128 10.67 0.67 0.378 ( 0.419) 0.257 0.121
129 10.75 0.67 0.378 ( 0.417) 0.257 0.121
130 10.83 0.67 0.378 ( 0.415) 0.257 0.121
131 10.92 0.67 0.378 ( 0.413) 0.257 0.121
132 11.00 0.67 0.378 ( 0.411) 0.257 0.121
133 11.08 0.63 0.359 ( 0.409) 0.244 0.115
134 11.17 0.63 0.359 ( 0.407) 0.244 0.115
135 11.25 0.63 0.359 ( 0.405) 0.244 0.115
136 11.33 0.63 0.359 ( 0.403) 0.244 0.115
137 11.42 0.63 0.359 ( 0.401) 0.244 0.115
138 11.50 0.63 0.359 ( 0.399) 0.244 0.115
139 11.58 0.57 0.322 ( 0.397) 0.219 0.103
140 11.67 0.57 0.322 ( 0.395) 0.219 0.103
141 11.75 0.57 0.322 ( 0.393) 0.219 0.103
142 11.83 0.60 0.341 ( 0.391) 0.232 0.109
143 11.92 0.60 0.341 ( 0.389) 0.232 0.109
144 12.00 0.60 0.341 ( 0.387) 0.232 0.109
145 12.08 0.83 0.473 ( 0.385) 0.322 0.151
146 12.17 0.83 0.473 ( 0.383) 0.322 0.151
147 12.25 0.83 0.473 ( 0.381) 0.322 0.151
148 12.33 0.87 0.492 ( 0.379) 0.335 0.157
149 12.42 0.87 0.492 ( 0.377) 0.335 0.157
150 12.50 0.87 0.492 ( 0.376) 0.335 0.157
151 12.58 0.93 0.530 ( 0.374) 0.360 0.170
152 12.67 0.93 0.530 ( 0.372) 0.360 0.170
153 12.75 0.93 0.530 ( 0.370) 0.360 0.170
154 12.83 0.97 0.549 0.368 ( 0.373) 0.181
155 12.92 0.97 0.549 0.366 ( 0.373) 0.182
156 13.00 0.97 0.549 0.364 ( 0.373) 0.184
157 13.08 1.13 0.643 0.363 ( 0.437) 0.281
158 13.17 1.13 0.643 0.361 ( 0.437) 0.283
159 13.25 1.13 0.643 0.359 ( 0.437) 0.284
160 13.33 1.13 0.643 0.357 ( 0.437) 0.286
161 13.42 1.13 0.643 0.355 ( 0.437) 0.288
162 13.50 1.13 0.643 0.353 ( 0.437) 0.290
163 13.58 0.77 0.435 ( 0.352) 0.296 0.139
164 13.67 0.77 0.435 ( 0.350) 0.296 0.139
165 13.75 0.77 0.435 ( 0.348) 0.296 0.139
166 13.83 0.77 0.435 ( 0.346) 0.296 0.139
167 13.92 0.77 0.435 ( 0.344) 0.296 0.139
168 14.00 0.77 0.435 ( 0.343) 0.296 0.139
169 14.08 0.90 0.511 0.341 ( 0.347) 0.170
170 14.17 0.90 0.511 0.339 ( 0.347) 0.172
171 14.25 0.90 0.511 0.337 ( 0.347) 0.173
172 14.33 0.87 0.492 ( 0.336) 0.335 0.157
173 14.42 0.87 0.492 0.334 ( 0.335) 0.158
7�0
174 14.50 0.87 0.492 0.332 ( 0.335) 0.160
175 14.58 0.87 0.492 0.331 ( 0.335) 0.161
176 14.67 0.87 0.492 0.329 ( 0.335) 0.163
177 14.75 0.87 0.492 0.327 ( 0.335) 0.165
178 14.83 0.83 0.473 ( 0.326) 0.322 0.151
179 14.92 0.83 0.473 ( 0.324) 0.322 0.151
180 15.00 0.83 0.473 ( 0.322) 0.322 0.151
181 15.08 0.80 0.454 ( 0.321) 0.309 0.145
182 15.17 0.80 0.454 ( 0.319) 0.309 0.145
183 15.25 0.80 0.454 ( 0.317) 0.309 0.145
184 15.33 0.77 0.435 ( 0.316) 0.296 0.139
185 15.42 0.77 0.435 ( 0.314) 0.296 0.139
186 15.50 0.77 0.435 ( 0.312) 0.296 0.139
187 15.58 0.63 0.359 ( 0.311) 0.244 0.115
188 15.67 0.63 0.359 ( 0.309) 0.244 0.115
189 15.75 0.63 0.359 ( 0.308) 0.244 0.115
190 15.83 0.63 0.359 ( 0.306) 0.244 0.115
191 15.92 0.63 0.359 ( 0.305) 0.244 0.115
192 16.00 0.63 0.359 ( 0.303) 0.244 0.115
193 16.08 0.13 0.076 ( 0.301) 0.051 0.024
194 16.17 0.13 0.076 ( 0.300) 0.051 0.024
195 16.25 0.13 0.076 ( 0.298) 0.051 0.024
196 16.33 0.13 0.076 ( 0.297) 0.051 0.024
197 16.42 0.13 0.076 ( 0.295) 0.051 0.024
198 16.50 0.13 0.076 ( 0.294) 0.051 0.024
199 16.58 0.10 0.057 ( 0.292) 0.039 0.018
200 16.67 0.10 0.057 ( 0.291) 0.039 0.018
201 16.75 0.10 0.057 ( 0.289) 0.039 0.018
202 16.83 0.10 0.057 ( 0.288) 0.039 0.018
203 16.92 0.10 0.057 ( 0.286) 0.039 0.018
204 17.00 0.10 0.057 ( 0.285) 0.039 0.018
205 17.08 0.17 0.095 ( 0.284) 0.064 0.030
206 17.17 0.17 0.095 ( 0.282) 0.064 0.030
207 17.25 0.17 0.095 ( 0.281) 0.064 0.030
208 17.33 0.17 0.095 ( 0.279) 0.064 0.030
209 17.42 0.17 0.095 ( 0.278) 0.064 0.030
210 17.50 0.17 0.095 ( 0.277) 0.064 0.030
211 17.58 0.17 0.095 ( 0.275) 0.064 0.030
212 17.67 0.17 0.095 ( 0.274) 0.064 0.030
213 17.75 0.17 0.095 ( 0.272) 0.064 0.030
214 17.83 0.13 0.076 ( 0.271) 0.051 0.024
215 17.92 0.13 0.076 ( 0.270) 0.051 0.024
216 18.00 0.13 0.076 ( 0.268) 0.051 0.024
217 18.08 0.13 0.076 ( 0.267) 0.051 0.024
218 18.17 0.13 0.076 ( 0.266) 0.051 0.024
219 18.25 0.13 0.076 ( 0.264) 0.051 0.024
220 18.33 0.13 0.076 ( 0.263) 0.051 0.024
221 18.42 0.13 0.076 ( 0.262) 0.051 0.024
222 18.50 0.13 0.076 ( 0.261) 0.051 0.024
223 18.58 0.10 0.057 ( 0.259) 0.039 0.018
224 18.67 0.10 0.057 ( 0.258) 0.039 0.018
225 18.75 0.10 0.057 ( 0.257) 0.039 0.018
226 18.83 0.07 0.038 ( 0.256) 0.026 0.012
227 18.92 0.07 0.038 ( 0.254) 0.026 0.012
7�1
228 19.00 0.07 0.038 ( 0.253) 0.026 0.012
229 19.08 0.10 0.057 ( 0.252) 0.039 0.018
230 19.17 0.10 0.057 ( 0.251) 0.039 0.018
231 19.25 0.10 0.057 ( 0.250) 0.039 0.018
232 19.33 0.13 0.076 ( 0.248) 0.051 0.024
233 19.42 0.13 0.076 ( 0.247) 0.051 0.024
234 19.50 0.13 0.076 ( 0.246) 0.051 0.024
235 19.58 0.10 0.057 ( 0.245) 0.039 0.018
236 19.67 0.10 0.057 ( 0.244) 0.039 0.018
237 19.75 0.10 0.057 ( 0.243) 0.039 0.018
238 19.83 0.07 0.038 ( 0.242) 0.026 0.012
239 19.92 0.07 0.038 ( 0.241) 0.026 0.012
240 20.00 0.07 0.038 ( 0.240) 0.026 0.012
241 20.08 0.10 0.057 ( 0.239) 0.039 0.018
242 20.17 0.10 0.057 ( 0.237) 0.039 0.018
243 20.25 0.10 0.057 ( 0.236) 0.039 0.018
244 20.33 0.10 0.057 ( 0.235) 0.039 0.018
245 20.42 0.10 0.057 ( 0.234) 0.039 0.018
246 20.50 0.10 0.057 ( 0.233) 0.039 0.018
247 20.58 0.10 0.057 ( 0.232) 0.039 0.018
248 20.67 0.10 0.057 ( 0.231) 0.039 0.018
249 20.75 0.10 0.057 ( 0.231) 0.039 0.018
250 20.83 0.07 0.038 ( 0.230) 0.026 0.012
251 20.92 0.07 0.038 ( 0.229) 0.026 0.012
252 21.00 0.07 0.038 ( 0.228) 0.026 0.012
253 21.08 0.10 0.057 ( 0.227) 0.039 0.018
254 21.17 0.10 0.057 ( 0.226) 0.039 0.018
255 21.25 0.10 0.057 ( 0.225) 0.039 0.018
256 21.33 0.07 0.038 ( 0.224) 0.026 0.012
257 21.42 0.07 0.038 ( 0.223) 0.026 0.012
258 21.50 0.07 0.038 ( 0.223) 0.026 0.012
259 21.58 0.10 0.057 ( 0.222) 0.039 0.018
260 21.67 0.10 0.057 ( 0.221) 0.039 0.018
261 21.75 0.10 0.057 ( 0.220) 0.039 0.018
262 21.83 0.07 0.038 ( 0.219) 0.026 0.012
263 21.92 0.07 0.038 ( 0.219) 0.026 0.012
264 22.00 0.07 0.038 ( 0.218) 0.026 0.012
265 22.08 0.10 0.057 ( 0.217) 0.039 0.018
266 22.17 0.10 0.057 ( 0.216) 0.039 0.018
267 22.25 0.10 0.057 ( 0.216) 0.039 0.018
268 22.33 0.07 0.038 ( 0.215) 0.026 0.012
269 22.42 0.07 0.038 ( 0.214) 0.026 0.012
270 22.50 0.07 0.038 ( 0.214) 0.026 0.012
271 22.58 0.07 0.038 ( 0.213) 0.026 0.012
272 22.67 0.07 0.038 ( 0.213) 0.026 0.012
273 22.75 0.07 0.038 ( 0.212) 0.026 0.012
274 22.83 0.07 0.038 ( 0.211) 0.026 0.012
275 22.92 0.07 0.038 ( 0.211) 0.026 0.012
276 2.3.00 0.07 0.038 ( 0.210) 0.026 0.012
277 23.08 0.07 0.038 ( 0.210) 0.026 0.012
278 23.17 0.07 0.038 ( 0.209) 0.026 0.012
279 23.25 0.07 0.038 ( 0.209) 0.026 0.012
280 23.33 0.07 0.038 ( 0.209) 0.026 0.012
281 23.42 0.07 0.038 ( 0.208) 0.026 0.012
72 282 23.50 0.07 0.038 ( 0.208)
283 23.58 0.07 0.038 ( 0.207)
284 23.67 0.07 0.038 ( 0.207)
285 23.75 0.07 0.038 ( 0.207)
286 23.83 0.07 0.038 ( 0.207)
287 23.92 0.07 0.038 ( 0.206)
288 24.00 0.07 0.038 ( 0.206)
(Loss Rate Not Used)
Sum = 100.0
Flood volume = Effective rainfall 1.56(In)
times area 4.2(Ac.)/[(In)/(Ft.)] =
Total soil loss = 3.17(In)
Total soil loss = 1.115(Ac.Ft)
Total rainfall = 4.73(In)
Flood volume = 23877.0 Cubic Feet
Total soil loss = 48579.4 Cubic Feet
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.012
0.012
0.012
0.012
0.012
0.012
0.012
Sum = 18.7
0.5(Ac.Ft)
Peak flow rate of this hydrograph = 1.230(CFS)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 24 - H O U R STORM
Runoff Hydrograph
Hydrograph in 5 Minute intervals ((CFS))
Time(h+m) Volume Ac.Ft Q(CFS) 0
2.5 5.0
7.5 10.0
0+ 5 0.0002 0.03 Q
0+10 0.0005 0.05 Q
0+15 0.0009 0.05 Q
0+20 0.0014 0.07 Q
0+25 0.0019 0.08 Q
0+30 0.0024 0.08 Q
0+35 0.0029 0.08 Q
0+40 0.0035 0.08 Q
0+45 0.0040 0.08 Q
0+50 0.0046 0.09 Q
0+55 0.0053 0.10 Q
1+ 0 0.0061 0.10 Q
1+ 5 0.0067 0.09 Q
1+10 0.0072 0.08 Q
1+15 0.0077 0.08 Q
1+20 0.0083 0.08 Q
1+25 0.0088 0.08 Q
1+30 0.0093 0.08 Q
1+35 0.0099 0.08 Q
1+40 0.0104 0.08 Q
1+45 0.0109 0.08 Q
1+50 0.0116 0.09 Q
1+55 0.0123 0.10 Q
2+ 0 0.0130 0.10 Q
2+ 5 0.0137 0.10 Q
2+10 0.0144 0.10 QV
7 3
2+15 0.0151 0.10 QV
2+20 0.0158 0.10 QV
2+25 0.0165 0.10 QV
2+30 0.0172 0.10 Qv
2+35 0.0181 0.12 QV
2+40 0.0189 0.13 QV
2+45 0.0198 0.13 QV
2+50 0.0207 0.13 QV
2+55 0.0216 0.13 QV
3+ 0 0.0225 0.13 QV
3+ 5 0.0234 0.13 QV
3+10 0.0243 0.13 QV
3+15 0.0251 0.13 QV
3+20 0.0260 0.13 QV
3+25 0.0269 0.13 QV
3+30 0.0278 0.13 Q v
3+35 0.0287 0.13 Q V
3+40 0.0296 0.13 Q V
3+45 0.0305 0.13 Q V
3+50 0.0315 0.14 Q V
3+55 0.0325 0.15 Q V
4+ 0 0.0336 0.15 Q V
4+ 5 0.0346 0.15 Q V
4+10 0.0357 0.15 Q V
4+15 0.0368 0.15 Q V
4+20 0.0379 0.17 Q V
4+25 0.0392 0.18 Q V
4+30 0.0404 0.18 Q V
4+35 0.0417 0.18 Q V
4+40 0.0429 0.18 Q V
4+45 0.0441 0.18 Q V
4+50 0.0455 0.20 Q V
4+55 0.0469 0.20 Q V
5+ 0 0.0483 0.21 Q V
5+ 5 0.0495 0.18 Q V
5+10 0.0506 0.16 Q V
5+15 0.0517 0.15 Q V
5+20 0.0528 0.17 Q V
5+25 0.0541 0.18 Q V
5+30 0.0553 0.18 Q V
5+35 0.0567 0.20 Q V
5+40 0.0581 0.20 Q V
5+45 0.0595 0.21 Q V
5+50 0.0609 0.21 Q V
5+55 0.0623 0.21 Q V
6+ 0 0.0637 0.21 Q V
6+ 5 0.0653 0.22 Q V
6+10 0.0669 0.23 Q V
6+15 0.0685 0.23 Q V
6+20 0.0701 0.23 Q V
6+25 0.0717 0.23 Q V
6+30 0.0732 0.23 Q V
6+35 0.0749 0.25 Q V
6+40 0.0767 0.26 IQ V
7�4
6+45 0.0785 0.26 Q V
6+50 0.0803 0.26 Q V
6+55 0.0820 0.26 Q V
7+ 0 0.0838 0.26 Q V
7+ 5 0.0856 0.26 Q V
7+10 0.0874 0.26 Q V
7+15 0.0891 0.26 Q V
7+20 0.0910 0.27 Q V
7+25 0.0930 0.28 Q V
7+30 0.0949 0.28 Q V
7+35 0.0970 0.30 Q V
7+40 0.0991 0.31 Q V
7+45 0.1012 0.31 Q V
7+50 0.1034 0.32 Q V
7+55 0.1057 0.33 Q V
8+ 0 0.1081 0.33 Q V
8+ 5 0.1106 0.36 Q V
8+10 0.1132 0.38 Q V
8+15 0.1159 0.39 Q V
8+20 0.1185 0.39 Q V
8+25 0.1212 0.39 Q V
8+30 0.1239 0.39 Q V
8+35 0.1266 0.40 Q V
8+40 0.1295 0.41 Q V
8+45 0.1323 0.41 Q V
8+50 0.1352 0.43 Q V
8+55 0.1382 0.44 Q V
9+ 0 0.1413 0.44 Q V
9+ 5 0.1445 0.47 Q V
9+10 0.1478 0.49 Q V
9+15 0.1512 0.49 Q V
9+20 0.1547 0.50 Q V
9+25 0.1582 0.51 Q V
9+30 0.1618 0.52 Q V
9+35 0.1654 0.53 Q V
9+40 0.1691 0.54 Q v
9+45 0.1729 0.54 Q V
9+50 0.1767 0.56 Q V
9+55 0.1806 0.57 Q v
10+ 0 0.1845 0.57 Q V
10+ 5 0.1877 0.46 Q V
10+10 0.1904 0.39 Q V
10+15 0.1931 0.39 Q V
10+20 0.1957 0.39 Q V
10+25 0.1984 0.39 Q V
10+30 0.2010 0.39 Q V
10+35 0.2042 0.46 Q V
10+40 0.2077 0.51 Q V
10+45 0.2113 0.52 Q V
10+50 0.2148 0.52 Q V
10+55 0.2184 0.52 Q V
11+ 0 0.2219 0.52 Q V
11+ 5 0.2254 0.50 Q V
11+10 0.2287 0.49 Q V
75 11+15 0.2321 0.49 Q
11+20 0.2355 0.49 Q
11+25 0.2389 0.49 Q
11+30 0.2422 0.49 Q
11+35 0.2454 0.46 Q
11+40 0.2484 0.44 Q
11+45 0.2514 0.44 Q
11+50 0.2546 0.45 Q
11+55 0.2577 0.46 Q
12+ 0 0.2609 0.46 Q
12+ 5 0.2649 0.57 Q
12+10 0.2692 0.64 Q
12+15 0.2737 0.64 Q
12+20 0.2782 0.66 Q
12+25 0.2828 0.67 Q
12+30 0.2874 0.67 Q
12+35 0.2922 0.70 Q
12+40 0.2972 0.72 Q
12+45 0.3022 0.72 Q
12+50 0.3073 0.75 Q
12+55 0.3126 0.77 Q
13+ 0 0.3180 0.78 Q
13+ 5 0.3251 1.02 Q
13+10 0.3332 1.18 Q
13+15 0.3415 1.21 Q
13+20 0.3499 1.21 Q
13+25 0.3583 1.22 Q
13+30 0.3668 1.23 Q
13+35 0.3727 0.86 Q
13+40 0.3770 0.62 Q
13+45 0.3810 0.59 Q
13+50 0.3851 0.59 Q
13+55 0.3892 0.59 Q
14+ 0 0.3933 0.59 Q
14+ 5 0.3979 0.67 Q
14+10 0.4028 0.72 Q
14+15 0.4079 0.73 Q
14+20 0.4127 0.70 Q
14+25 0.4174 0.67 Q
14+30 0.4220 0.68 Q
14+35 0.4267 0.68 Q
14+40 0.4315 0.69 Q
14+45 0.4363 0.70 Q
14+50 0.4409 0.67 Q
14+55 0.4453 0.65 Q
15+ 0 0.4497 0.64 Q
15+ 5 0.4541 0.63 Q
15+10 0.4583 0.62 Q
15+15 0.4626 0.62 Q
15+20 0.4668 0.60 Q
15+25 0.4708 0.59 Q
15+30 0.4749 0.59 Q
15+35 0.4786 0.53 Q
15+40 0.4820 0.49 Q
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
76 15+45 0.4854 0.49 IQ
15+50 0.4887 0.49 IQ
15+55 0.4921 0.49 IQ
16+ 0 0.4955 0.49 IQ
16+ 5 0.4973 0.26 IQ
16+10 0.4981 0.12 Q
16+15 0.4988 0.10 Q
16+20 0.4996 0.10 Q
16+25 0.5003 0.10 Q
16+30 0.5010 0.10 Q
16+35 0.5016 0.09 Q
16+40 0.5021 0.08 Q
16+45 0.5027 0.08 Q
16+50 0.5032 0.08 Q
16+55 0.5037 0.08 Q
17+ 0 0.5042 0.08 Q
17+ 5 0.5050 0.11 Q
17+10 0.5059 0.13 Q
17+15 0.5067 0.13 Q
17+20 0.5076 0.13 Q
17+25 0.5085 0.13 Q
17+30 0.5094 0.13 Q
17+35 0.5103 0.13 Q
17+40 0.5112 0.13 Q
17+45 0.5121 0.13 Q
17+50 0.5129 0.11 Q
17+55 0.5136 0.10 Q
18+ 0 0.5143 0.10 Q
18+ 5 0.5150 0.10 Q
18+10 0.5157 0.10 Q
18+15 0.5164 0.10 Q
18+20 0.5171 0.10 Q
18+25 0.5178 0.10 Q
18+30 0.5185 0.10 Q
18+35 0.5191 0.09 Q
18+40 0.5197 0.08 Q
18+45 0.5202 0.08 Q
18+50 0.5206 0.06 Q
18+55 0.5210 0.05 Q
19+ 0 0.5214 0.05 Q
19+ 5 0.5218 0.07 Q
19+10 0.5223 0.08 Q
19+15 0.5229 0.08 Q
19+20 0.5235 0.09 Q
19+25 0.5242 0.10 Q
19+30 0.5249 0.10 Q
19+35 0.5255 0.09 Q
19+40 0.5261 0.08 Q
19+45 0.5266 0.08 Q
19+50 0.5270 0.06 Q
19+55 0.5274 0.05 Q
20+ 0 0.5278 0.05 Q
20+ 5 0.5282 0.07 Q
20+10 0.5287 0.08 Q
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
77 20+15 0.5293 0.08 Q
20+20 0.5298 0.08 Q
20+25 0.5303 0.08 Q
20+30 0.5309 0.08 Q
20+35 0.5314 0.08 Q
20+40 0.5319 0.08 Q
20+45 0.5325 0.08 Q
20+50 0.5329 0.06 Q
20+55 0.5333 0.05 Q
21+ 0 0.5336 0.05 Q
21+ 5 0.5341 0.07 Q
21+10 0.5346 0.08 Q
21+15 0.5351 0.08 Q
21+20 0.5355 0.06 Q
21+25 0.5359 0.05 Q
21+30 0.5363 0.05 Q
21+35 0.5367 0.07 Q
21+40 0.5372 0.08 Q
21+45 0.5378 0.08 Q
21+50 0.5382 0.06 Q
21+55 0.5386 0.05 Q
22+ 0 0.5389 0.05 Q
22+ 5 0.5394 0.07 Q
22+10 0.5399 0.08 Q
22+15 0.5404 0.08 Q
22+20 0.5409 0.06 Q
22+25 0.5412 0.05 Q
22+30 0.5416 0.05 Q
22+35 0.5419 0.05 Q
22+40 0.5423 0.05 Q
22+45 0.5427 0.05 Q
22+50 0.5430 0.05 Q
22+55 0.5434 0.05 Q
23+ 0 0.5437 0.05 Q
23+ 5 0.5441 0.05 Q
23+10 0.5444 0.05 Q
23+15 0.5448 0.05 Q
23+20 0.5451 0.05 Q
23+25 0.5455 0.05 Q
23+30 0.5458 0.05 Q
23+35 0.5462 0.05 Q
23+40 0.5466 0.05 Q
23+45 0.5469 0.05 Q
23+50 0.5473 0.05 Q
23+55 0.5476 0.05 Q
24+ 0 0.5480 0.05 Q
24+ 5 0.5481 0.02 Q
24+10 0.5481 0.00 Q
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
7�8
CIVILCADD/CIVILDESIGN Engineering Software, (c) 2004 Version 7.0
CURB INLET CAPACITY
TTM 38636
RANCHO MIRAGE
Program License Serial Number 6260
*** Street Flow +Inlet Analysis ***
Upstream (headworks) Elevation = 326.510(Ft.)
Downstream (outlet) Elevation = 324.000(Ft.)
Runoff/Flow Distance = 502.000(Ft.)
Maximum flow rate in channel(s) = 11.300(CFS)
Top of street segment elevation = 326.510(Ft.)
End of street segment elevation = 324.000(Ft.)
Length of street segment = 502.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 18.000(Ft.)
Distance from crown to crossfall grade break = 16.500(Ft.) Slope from gutter to grade break (v/hz) = 0.086
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [2] side(s) of the street
Distance from curb to property line = 12.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 1.500(Ft.)
Gutter hike from flowline = 1.500(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0130
Manning's N from grade break to crown = 0.0150
Half street cross section data points:
X-coordinate (Ft.) Y-coordinate (Ft.)
0.0000
12.0000
12.0000
13.5000
13.5000
30.0000
0.7400 right of way
0.5000 top of curb
0.0000 flow line
0.1250 gutter end
0.1250 grade break
0.4550 crown
CURB INLET TYPE STREET DRAIN, Opening Height = 8.000(In.) Street Inlet Calculations:
Street flow in street inlet depression =
Gutter depression depth = 4.000(In.)
Gutter depression width = 1.500(Ft.)
Depth of flow = 0.735(Ft.)
11.300(CFS)
79 Average velocity = 2.113(Ft/s)
Total flow rate in 1/2 street = 5.650(CFS)
U.S. DOT Hydraulic Engineering Circular No. 12 inlet calculations:
Street flow half width at start of inlet = 15.339(Ft.)
Flow rate in gutter section of street = Qw = 2.339(CFS) Given inlet length L = 4.000(Ft.)
Ratio of frontal flow to total flow = EO 0.4140
Street slope is less than 0.50 ,
Depth of flow indicates an orifice flow
condition exists for an opening height of 8.00(In.)
Using equation Qi = .67hL(2gd0)^.5
Maximum inlet flow capacity = 18.177(CFS)
Half street cross section data points through curb inlet:
X-coordinate (Ft.) Y-coordinate (Ft.)
0.0000 1.0733 right of way
12.0000 0.8333 top of curb
12.0000 0.0000 flow line
13.5000 0.4583 gutter/depression end
13.5000 0.4583 grade break
30.0000 0.7883 crown
Note: Street inlet capacity is greater than existing flow in street.
Remaining flow in street below inlets = 0.000(CFS)
Zero flow remaining in street
740
So
H UV
S
o/n❑
EXIST. C & G
N 89 '43'18"E
-RO-AD
H/J V oL
®W
H
CONST
UNDER
O/f
POOL
SPA
m
CONC
POOL
P
Co
Oo
0/n❑ 0/nE
OBSCURED
GROUND
SCURED
CPn UND
cI
f
i
-232.9-4
3v ZZ.-17=b
35.0 Q7,
TT
41'27'E 329.94'
BSCUF ED
GROUND T
Ao
Ao
So
CBS • .i
MI
GROUND
So
OBSCUR-•
GROUND
- So Sly
, g %
A ,,
A A
SPH
- .� H/J�
o
sPH no
N 89'43'18'
E
A
EXIST. C & G
�
o
8/ W o
n o
�.�
H V
All
i
\P
r
o
-
w
rri
So
r
° ®w
LA PSGAPI
P
LANDSCA'
J
I ll.`��'
142 .7h%n o
;��
109.34' 32
p0
\
.:
O
Qlp;4
DIRT
O��)
oi o
O (
Q1Op 4
30 �®
S
N'
RETENTIoON BASIN/
OB'
GR3
•
-
, OPEN AREA
-�r�i1
�,i1
N89' 4�'18"E
�'• '
18'
i�
-
G
11 . 53
\
7.50' TANK
7 a•
I
CONS '
UNDER
UCTION
O
0 O
�(0
-P
CD -
o
m
W �
m'
D
N89'48'26"W
127.51'
127.50'
POOL
0 0
O
J
Z
O
N O
• OD
N
�\
("7
•
SPA
TD
DN
'E 509.
a U)
'�1-13
(l1
•
(i)
mil
II
;DN
P1
CO
fV
;771
C1
N89' 48'26"W
y
�
N89' :'26"W
rn
127. 49'
127.5
CONS 'UCTION
JNDER
-
>
F
C;C:3 ---)i
�I
CD
-p.c°
•
N
>..
C.a V
Vl
C
POOL
J�
IOo
N8 ' 48'26"W ���
89' 48' :6"W
109.51'
1 ►`9.55
00 .0
(1?(,
.
U
0 6 \
•
O•
O
O O
100
(A 4 S et . ��Zf
of
/n
/n❑
°.
D -P D•
o ,00 '6S c7
u)-9
m -, m •
;
(n • Cn •
00 c �6 .
44c. 6
_ �.
�O
7' �`9'- D
IP Oo
J
n 7.00'
zi v
O
m_
cn •
F��BB
",
5.00 -
c,,
O
N
— 27"E 329.94'
,
H
"I
POOL )
POOL
OBSCUR
GROUND
�'�i \ -
o/
o
Q
GO GR N
' •BSCU^
l GROU
• .
4 0
U
P1
0 -0O
mO
z -\
U
NOAA Atlas 14, Volume 6, Version 2
Location name: Rancho Mirage, California, USA*
Latitude: 33.7948°, Longitude: -116.4041°
Elevation: m/ft**
* source: ESRI Maps
** source: USGS
POINT PRECIPITATION FREQUENCY ESTIMATES
Sanja Perica, Sarah Dietz, Sarah Heim, Lillian Hiner, Kazungu Maitaria, Deborah Martin, Sandra Pavlovic, Ishani Roy, Carl Trypaluk, Dale Unruh, Fenglin Yan, Michael Yekta, Tan Zhao, Geoffrey Bonnin, Daniel Brewer, Li-Chuan Chen, Tye Parzybok, John Yarchoan NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials
PF tabular
PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration
5 -min
10 -min
15 -min
30 -min
60 -min
2 -hr
3 -hr
6 -hr
12 -hr
24 -hr
2 -day
3 -day
4 -day
7 -day
10 -day
20 -day
30 -day
45 -day
60 -day
Average recurrence interval (years)
1 0.061
(0.050-0.073)
0.087
(0.072-0.105)
0.105
(0.088-0.127)
0.164
(0.136-0.198)
0.239
(0.199-0.289)
0.340
(0.283-0.411)
0.409
(0.341-0.495)
0.557
(0.464-0.675)
0.667
(0.556-0.809)
0.779
(0.690-0.898)
0.862
(0.763-0.994)
0.903
(0.799-1.04)
0.930
(0.823-1.07)
0.992
(0.878-1.14)
1.04 (0.922-1.20)
1.13 (1.00-1.30)
1.26 (1.11-1.45)
1.37 (1.21-1.57)
1.49 (1.32-1.71)
2 0.094
(0.078-0.114)
0.134
(0.112-0.163)
0.163
(0.135-0.197)
0.253
(0.211-0.307)
0.370
(0.308-0.448)
0.515
(0.429-0.625)
0.616
(0.512-0.747)
0.837
(0.697-1.02)
1.02 (0.846-1.23)
1.21 (1.07-1.40)
1.35 (1.20-1.56)
1.42 (1.26-1.64)
1.47 (1.30-1.70)
1.58 (t40-1.83)
1.67 (1.48-1.93)
1.83 (1.61-2.11)
2.04 (1.80-2.35)
2.22 (1.96-2.56)
2.42 (2.14-2.79)
5 0.145
(0.120-0.176)
0.208
(0.172-0.253)
0.251
(0.208-0.305)
0.391
(0.325-0.476)
0.571
(0.474-0.694)
0.776
(0.644-0.945)
0.920
(0.764-1.12)
1.24 (1.03-1.51)
1.52 (1.26-1.85)
1.83 (1.62-2.12)
2.06 (1.82-2.39)
2.17 (1.92-2.52)
2.25 (1.99-2.61)
2.43 (2.15-2.82)
2.57 (2.27-2.98)
2.84 (2.50-3.28)
3.18 (2.80-3.68)
3.48 (3.07-4.03)
3.80 (3.35-4.39)
10 0.193
(0.159-0.236)
0.276
(0.227-0.339)
0.334
(0.275-0.410)
0.521
(0.428-0.639)
0.759
(0.625-0.932)
1.01 (0.836-1.25)
1.20 (0.984-1.47)
1.61 (1.32-1.97)
1.98 (1.63-2.42)
2.39 (2.09-2.79)
2.69 (2.35-3.14)
2.84 (2.48-3.31)
2.94 (2.57-3.43)
3.19 (2.79-3.72)
3.37 (2.95-3.93)
3.73 (3.26-4.35)
4.19 (3.67-4.89)
4.61 (4.04-5.38)
5.04 (4.41-5.88)
25 0.269
(0.214-0.342)
0.386
(0.307-0.490)
0.466
(0.371-0.592)
0.727
(0.578-0.923)
1.06 (0.844-1.35)
1.38 (1.10-1.76)
1.62 (1.29-2.05)
2.15 (1.71-2.73)
2.65 (2.11-3.37)
3.23 (2.74-3.89)
3.63 (3.08-4.37)
3.83 (3.24-4.61)
3.97 (3.36-4.78)
4.30 (3.64-5.18)
4.56 (3.86-5.49)
5.07 (4.29-6.10)
5.72 (4.84-6.88)
6.32 (5.36-7.61)
6.93 (5.87-8.34)
50 0.338
(0.263-0.438)
0.484
(0.377-0.628)
0.586
(0.456-0.760)
0.913
(0.711-1.18)
1.33 (1.04-1.73)
1.71 (1.33-2.21)
1.98 (1.54-2.56)
2.62 (2.04-3.39)
3.23 (2.52-4.19)
3.94 (3.27-4.85)
4.42 (3.67-5.44)
4.66 (3.87-5.73)
4.83 (4.01-5.94)
5.24 (4.35-6.43)
5.55 (4.61-6.82)
6.19 (5.14-7.60)
7.00 (5.81-8.60)
7.77 (6.45-9.55)
8.54 (7.09-10.5)
100
0.418
(0.318-0.556)
0.599
(0.455-0.797)
0.725
(0.551-0.964)
1.13 (0.858-1.50)
1.65 (1.25-2.19)
2.07 (1.57-2.75)
2.38 (1.81-3.17)
3.13 (2.38-4.16)
3.87 (2.94-5.15)
4.73 (3.84-5.96)
5.30 (4.30-6.66)
5.58 (4.52-7.02)
5.78 (4.69-7.27)
6.26 (5.07-7.87)
6.64 (5.38-8.35)
7.41 (6.01-9.33)
8.40 (6.81-10.6)
9.35 (7.59-11.8)
10.3 (8.36-13.0)
200
0.513
(0.379-0.702)
0.735
(0.543-1.01)
0.889
(0.656-1.22)
1.39 (1.02-1.90)
2.02 (1.49-2.77)
2.49 (1.84-3.40)
2.84 (2.10-3.89)
3.70 (2.73-5.07)
4.59 (3.39-6.28)
5.62 (4.44-7.27)
6.27 (4.95-8.11)
6.60 (5.21-8.53)
6.83 (5.39-8.83)
7.39 (5.83-9.55)
7.84 (6.19-10.1)
8.77 (6.92-11.3)
9.95 (7.85-12.9)
11.1 (8.77-14.4)
12.3 (9.67-15.8)
500
0.666
(0.471-0.951)
0.955
(0.676-1.36)
1.16 (0.817-1.65)
1.80 (1.27-2.57)
2.63 (1.86-3.75)
3.13 (2.21-4.47)
3.53 (2.50-5.04)
4.57 (3.23-6.52)
5.66 (4.00-8.08)
6.96 (5.28-9.36)
7.73 (5.86-10.4)
8.12 (6.15-10.9)
8.40 (6.37-11.3)
9.06 (6.87-12.2)
9.61 (7.29-12.9)
10.8 (8.16-14.5)
12.2 (9.27-16.5)
13.7 (10.4-18.4)
15.1 (11.5-20.4)
1000
0.841
(0.575-1.24)
1.21 (0.824-1.78)
1.46 (0.996-2.16)
2.27 (1.55-3.36)
3.32 (2.27-4.90)
3.71 (2.53-5.48)
4.14 (2.83-6.13)
5.30 (3.62-7.84)
6.58 (4.49-9.73)
8.11 (5.95-11.3)
8.97 (6.58-12.5)
9.41 (6.90-13.1)
9.72 (7.13-13.5)
10.5 (7.68-14.6)
11.1 (8.14-15.4)
12.4 (9.12-17.3)
14.1 (10.4-19.7)
15.8 (11.6-22.0)
17.6 (12.9-24.4)
1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).
Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.
Please refer to NOAA Atlas 14 document for more information. 744
Back to Top
PF graphical
PDS-based depth -duration -frequency (DDF) curves
Latitude: 33.7948", Lon g rtu d e: -116.4041°
Precipitation depth (in)
Precipitation depth (in)
18 _
16 14
12 10
8 6
4 -
2 0
C C
• C E E
u-i t u;
r -I r -I
18 16
14 12
10 8
6 4
Duration
E
i
r
r rd] u
I
N
-0o . v -0a -0 -0 v
r,!4 r6 4 A 6 6 6 IJ'S Q
2 5 10 25 50 100 200 500 1000
htOAA Atlas 14, Volume 6, Version 2
Average recurrence interval (years)
Created (GMT): Wed May 3 13:39:02 2023
Back to Top
Maps & aerials
Small scale terrain
Average recurrence
interval
(years),
1 2
5 10
25 50
100
200
500
1000
Duration
5 -mm
10 -min
15-rnrn
30 -mm
60- mm
2 -hr
3 -hr
6 -hr
12 -hr
24 -hr
2 -day
3 -day
4 -day
7 -day
10 -day
20 -day
30 -day
45 -day
60 -day
745
Large scale terrain
Lancaster
•
•
Palmdale
•
to
•
Victorville
]s Angeles Riverside #.
• �''rty,{.
Beach •Anaheim Cathedral c
• � ti
Santa Ana Palm Desert! Indio
Murrieta •
Oceanside''
100km 1 Diego
60mi
•
Lake H
Large scale map
inca&ter
..Palmcale etcrvilla
SantaClarita E
Los Angeles
Riversicle I
Anaheim Lathed
3eachc 'NO +'.Inclid
antaAna lain' Desert " -"` 4
'.hlurrieta
100km
f Lions'
60mi
La
H.:
gym: i
Yuma
MeisFcaFr—
Large scale aerial
746
Back to Top
US Department of Commerce
National Oceanic and Atmospheric Administration
National Weather Service
National Water Center
1325 East West Highway
Silver Spring, MD 20910
Questions?: [email protected]
Disclaimer
747
Whitewater Watershed
Required Entries
Calculated Cells
BMP Design Volume, VBMP (Rev. 06-2014)
Legend:
Company Name SD Engineering ans Associates
Date
County/City Case No
TTM 38636
4/28/2023
Designed by Suresh
Company Project Number/Name
Drainage Area Number/Name DA 1
Enter the Area Tributary to this Feature (ATRIB)
ATRIB = 4.22 acres
Determine the Impervious Area Ratio
Determine the Impervious Area within ATRIB (AIMP) AIMP = Calculate Impervious Area Ratio (If) If=
If = AIMP/ATRIB
1.68 acres
0.40 Calculate the composite Runoff Coefficient, C for the BMP Tributary Area Use the following equation based on the WEF/ASCE Method CBMP = 0.858If3 - 0.78If2 + 0.774I f + 0.04 CBMP =
0.28 Determine Design Storage Volume, VBMP
Calculate Vu, the 80% Unit Storage Volume Vu= 0.40 X CBMP VU = Calculate the design storage volume of the BMP, VBMP.
VBMP (ft3)= Vu (in-ac/ac) x AT (ac) x 43,560 (ft2/ac) VBMP =
0.11 (in*ac)/ac
1,685 ft3
12 (in/ft)
Notes:
748
Infiltration
Basin - Design Procedure
(Rev. 03-2012)
BMP ID
Legend:
Recuired Entries
Calculated Cells
Company Name:
Designed by:
72094 Ginger Rogers Lane
County/City
Date: 4/28/2023
Case No.: Zancho Mirag
Design Volume
a) Tributary area (BMP subarea) AT =
b) Enter VBMP determined from Section 2.1 of this Handbook VBMP=
4.22 acres
1,685 ft3
Maximum Depth
a) Infiltration rate
(See Table 1, Appendix A: "Infiltration Testing"
Handbook)
D1 = I (in/hr) x 72 hrs
I =
FS =
D1 =
of basin)
D2 =
DMax =
4.5 in/hr
2 OVLS,5 ft
b) Factor of Safety
from this BMP
c) Calculate D1
d) Enter the depth
e) Enter depth to
f) Enter depth to
g) D2 is the smaller
Depth to groundwater
Depth to impermeable
h) DMax is the smaller
12 (in/ft) x FS
of freeboard (at least 1 ft)
historic high ground water (measured from top of basin) top of bedrock or impermeable layer (measured from top
of:
- (10 ft + freeboard) and
layer - (5 ft + freeboard)
value of D1 and D2 but shall not exceed 5 feet
1 ft
200 ft
70 ft
ft
13.5 ft
Basin Geometry
a) Basin side slopes (no steeper than 4:1) z =
b) Proposed basin depth (excluding freeboard) dB =
c) Minimum bottom surface area of basin (As= VBMP/dB) As = d) Proposed Design Surface Area AD =
4 :1
1.5 ft
I ft2
3441 ft2
Forebay
a) Forebay volume (minimum 0.5% VBMP) Volume =
b) Forebay depth (height of berm/splashwall. 1 foot min.) Depth = c) Forebay surface area (minimum) Area =
d) Full height notch -type weir Width (W) =
ft3
1 ft
8 ft2
12.0 in
Notes:
749
❑❑❑❑d® ❑ ❑r❑® ❑❑❑
❑ ❑D' ❑ ❑❑
M ❑❑❑❑❑❑ ❑❑❑❑
d ❑®d ❑ Er ❑❑❑❑❑❑
750
2014 Whitewater River Region WQMP
Project Specific
Water Quality Management Plan
For: Tentative Tract Map 38636
City of Rancho Mirage
DEVELOPMENT NO. TENTATIVE TRACT MAP 38636
DESIGN REVIEW NO. ENTITLEMENT APPLICATION
Prepared for:
72094 Ginger Rogers LLC
Att'n: Farhad Zomoradi
P.O. Box 10544
Beverly Hills, Ca. 90213
Telephone: 310-428-2875
Prepared by:
SD Engineering and Associates
242 E. Airport Drive, Ste. 212
San Bernardino, CA. 92408
(909) 215-3451
Original Date Prepared: April 28, 2023
Revision Date(s): Date
751
2014 Whitewater River Region WQMP
TM38636
OWNER'S CERTIFICATION
This project -specific Water Quality Management Plan (WQMP) has been prepared for:
72094 Ginger Rogers LLC
P.O. Box 10544, Beverly Hills, Ca. 90213
for the project known as Tentative Parcel Map 38636, in the City of Rancho Mirage This WQMP is intended to comply with the requirements of City of Rancho Mirage for Tentative Tract Map 38636 which includes the requirement for the preparation and implementation of a project -specific WQMP.
The undersigned, while owning the property/project described in the preceding paragraph, shall be responsible for the implementation of this WQMP and will ensure that this WQMP is amended as appropriate to reflect up-to-date conditions on the site. This WQMP will be reviewed with the facility operator, facility supervisors, employees, tenants, maintenance and service contractors, or any other party (or parties) having responsibility for implementing portions of this WQMP. At least one copy of this WQMP will be maintained at the project site or project office in perpetuity.
The undersigned is authorized to certify and to approve implementation of this WQMP. The undersigned is aware that implementation of this WQMP is enforceable under City of Rancho Mirage Water Quality Ordinance (Municipal Code Section ).
If the undersigned transfers its interest in the subject property/project, the undersigned shall notify the successor in interest of its responsibility to implement this WQMP. "I, the undersigned, certify under penalty of law that I am the owner of the property that is the subject of this WQMP, and that the provisions of this WQMP have been reviewed and accepted and that the WQMP will be transferred to future successors in interest."
ATTEST
Owner's Signature
Farhad Zomoradi
Owner's Printed Name
Notary Signature
Owner
Owner's Title/Position
Printed Name
Date
Title/Position
P.O. Box 10544
Beverly Hills, Ca. 90213
310 428-2875
June 6, 2022
Date
752
2014 Whitewater River Region WQMP
TM38636
THIS FORM SHALL BE NOTARIZED BEFORE ACCEPTANCE OF THE
FINAL PROJECT SPECIFIC WQMP
TO BE INCLUDED IN FINAL WQMPs (AFTER FINAL PLAN CHECK)
June 6, 2022
753
2014 Whitewater River Region WQMP
TM38636
Contents
SECTION PAGE
I. Project Description 1
II. Site Characterization 4
IH. Pollutants of Concern 6
IV. Hydrologic Conditions of Concern 7
V. Best Management Practices 8
V.1 SITE DESIGN BMP CONCEPTS, LID/SITE DESIGN AND TREATMENT CONTROL BMPs 8 V.1.A SITE DESIGN BMP CONCEPTS AND LID/SITE DESIGN BMPS 10 V.1.B TREATMENT CONTROL BMPs 16
V.1.C MEASURABLE GOAL SUMMARY 18
V.2 SOURCE CONTROL BMPs 19
V.3 EQUIVALENT TREATMENT CONTROL BMP ALTERNATIVES 21
V.4 REGIONALLY -BASED BMPs 21
VI. Operation and Maintenance Responsibility for BMPs 22 VII. Funding 25
TABLES
TABLE 1. POLLUTANT OF CONCERN SUMMARY 6
TABLE 2. BMP SELECTION MATRIX BASED UPON POLLUTANT OF CONCERN REMOVAL EFFICIENCY 9 TABLE 3. IMPLEMENTATION OF SITE DESIGN BMP CONCEPTS 11
TABLE 4. LID/SITE DESIGN BMPs MEETING THE LID/SITE DESIGN MEASURABLE GOAL 15 TABLE 5: TREATMENT CONTROL BMP SUMMARY 17
TABLE 6: MEASURABLE GOAL SUMMARY 18
TABLE 7. SOURCE CONTROL BMPs 19
APPENDICES
A. CONDITIONS OF APPROVAL
B. VICINITY MAP, WQMP SITE PLAN, AND RECEIVING WATERS MAP C. SUPPORTING DETAIL RELATED TO HYDROLOGIC CONDITIONS OF CONCERN (IF APPLICABLE) D. EDUCATIONAL MATERIALS
E. SOILS REPORT (IF APPLICABLE)
F. STRUCTURAL BMP AND/OR RETENTION FACILITY SIZING CALCULATIONS AND DESIGN DETAILS G. AGREEMENTS - CC&Rs, COVENANT AND AGREEMENTS, BMP MAINTENANCE AGREEMENTS AND/OR
OTHER MECHANISMS FOR ENSURING ONGOING OPERATION, MAINTENANCE, FUNDING AND
TRANSFER OF REQUIREMENTS FOR THIS PROJECT -SPECIFIC WQMP H. PHASE 1 ENVIRONMENTAL SITE ASSESSMENT - SUMMARY OF Sl1'E REMEDIATION CONDUCTED AND
USE RESTRICTIONS
PROJECT -SPECIFIC WQMP SUMMARY DATA FORM
I.
June 6, 2022
754
2014 Whitewater River Region WQMP
TM38636
I.
Project Description
Project Owner:
WQMP Preparer:
Project Site Address:
Planning Area/
Community Name/
Development Name:
APN Number(s):
Latitude & Longitude:
Receiving Water:
Project Site Size:
72094 Ginger Rogers LLC
P.O. Box 10544
Beverly Hills, Ca. 90213
310 428-2875
SD Engineering and Associates
242 E. Airport Drive, Ste. 212
San Bernardino, Ca. 82408
909 215-3451
72094 Ginger Rogers Road
Rancho Mirage, Ca.
City of Rancho Mirage
Tentative Tract Map 38636
685-080-002
33.794783, -116.404113
Whitewater River
4.22 Acres
Standard Industrial Classification (SIC) Code:
1521
Formation of Home Owners' Association (HOA)
or Property Owners Association (POA): Y ® N ❑
June 6, 2022
755
2014 Whitewater River Region WQMP
TM38636
Additional Permits/Approvals required for the Project:
AGENCY
Permit required
State Department of Fish and Wildlife, Fish and Game
Code § 1602 Streambed Alteration Agreement
y
NV
State Water Resources Control Board, Clean Water Act
(CWA) Section 401 Water Quality Certification
y ❑
N A
US Army Corps of Engineers, CWA Section 404 permit
1' ❑
N 1
US Fish and Wildlife, Endangered Species Act Section 7
biological opinion
y ❑
NN
Statewide Construction General Permit Coverage
N❑
Y
Statewide Industrial General Permit Coverage
Y
NV
Other (please list in the space below as required)
June 6, 2022
756
2014 Whitewater River Region WQMP
TM38636
Describe project here.
Appendix A of this project -specific WQMP includes a complete copy of the final Conditions of Approval. Appendix B of this project -specific WQMP includes:
a. A Vicinity Map identifying the project site and surrounding planning areas in sufficient detail; and
b. A Site Plan for the project. The Site Plan included as part of Appendix B depicts the following project features:
• Location and identification of all structural BMPs, including Source Control, LID/Site Design and Treatment Control BMPs.
• Landscaped areas.
• Paved areas and intended uses (i.e., parking, outdoor work area, outdoor material storage area, sidewalks, patios, tennis courts, etc.).
• Number and type of structures and intended uses (i.e., buildings, tenant spaces, dwelling units, community facilities such as pools, recreation facilities, tot lots, etc.).
• Infrastructure (i.e., streets, storm drains, etc.) that will revert to public agency ownership and operation.
• Location of existing and proposed public and private storm drainage facilities (i.e., storm drains, channels, basins, etc.), including catch basins and other inlets/outlet structures. Existing and proposed drainage facilities should be clearly differentiated.
• Location(s) of Receiving Waters to which the project directly or indirectly discharges.
• Location of points where onsite (or tributary offsite) flows exit the property/project site.
• Delineation of proposed drainage area boundaries, including tributary offsite areas, for each location where flows exit the project site and existing site (where existing site flows are required to be addressed). Each tributary area should be clearly denoted.
• Pre- and post -project topography.
Appendix I is a one page form that summarizes pertinent in specific WQMP.
ormation relative to this project -
June 6, 2022
757
2014 Whitewater River Region WQMP
TM38636
II. Site Characterization
Land Use Designation or Zoning: R -L-2, Very Low Density Residential Current Property Use:
Proposed Property Use:
Residential
Residential
Availability of Soils Report: Y /1 N n Note: A soils report is required if infiltration BMPs are utilized. Attach report in Appendix E.
Phase 1 Site Assessment:
Y n NZ Note: If prepared, attached remediation
summary and use restrictions in Appendix H.
June 6, 2022
758
2014 Whitewater River Region WQMP
TM38636
Receiving Waters for Urban Runoff from Site
Receiving
Waters
EPA Approved
303(d) List
Imairments
Designated
Beneficial Uses
Proximity to RARE
Beneficial Use Designated
Receiving Waters
Whitewater
River
NONE
MUN, AGR, GWR, RECI,
REC II, COLD, WILD,
POW
N/A, 2 miles
June 6, 2022
759
2014 Whitewater River Region WQMP
TM38636
III. Pollutants of Concern
Table 1. Pollutant of Concern Summary
Pollutant Category
Potential for Project
and/or Existing Site
Causing Receiving Water
Impairment
Bacteria/Virus
Potential
Coachella Valley SWC
Heavy Metals
None
Nutrients
Potential
Coachella Valley SWC
Toxic Organic Compounds
None
Sediment/Turbidity
Potential
Coachella Valley SWC
Trash & Debris
Potential
Oil & Grease
Potential
Pesticides
Potential
Coachella Valley SWC
Other (specify pollutant):
June 6, 2022
760
2014 Whitewater River Region WQMP
TM38636
IV. Hydrologic Conditions of Concern
Local Jurisdiction Requires On -Site Retention of Urban Runoff:
Yes ® The project will be required to retain urban runoff onsite in conformance with local ordinance (See Table 6 of the WQMP Guidance document, "Local Land use Authorities Requiring Onsite Retention of Stormwater"). This section does not need to be completed; however, retention facility design details and sizing calculations must be included in Appendix F.
No n This section must be completed.
This Project meets the following condition:
Condition A: 1) Runoff from the Project is discharged directly to a publicly -owned, operated and maintained MS4 or engineered and maintained channel, 2) the discharge is in full compliance with local land use authority requirements for connections and discharges to the MS4 (including both quality and quantity requirements), 3) the discharge would not significantly impact stream habitat in proximate Receiving Waters, and 4) the discharge is authorized by the local land use authority.
Condition B: The project disturbs less than 1 acre and is not part of a larger common plan of development that exceeds 1 acre of disturbance. The disturbed area calculation must include all disturbances associated with larger plans of development.
Condition C: The project's runoff flow rate, volume, velocity and duration for the post -development condition do not exceed the pre -development condition for the 2 - year, 24 -hour and 10 -year 24 -hour rainfall events. This condition can be achieved by, where applicable, complying with the local land use authority's on -site retention ordinance, or minimizing impervious area on a site and incorporating other Site - Design BMP concepts and LID/Site Design BMPs that assure non-exceedance of pre -development conditions. This condition must be substantiated by hydrologic modeling methods acceptable to the local land use authority.
None: Refer to Section 3.4 of the Whitewater River Region WQMP Guidance document for additional requirements.
Supporting engineering studies, calculations, and reports are included in Appendix C. 2 year — 24 hour
10 year — 24 hour
Precondition
Post -condition
Precondition
Post -condition
Discharge (cfs)
Velocity (fps)
Volume (cubic
feet)
Duration (minutes)
June 6, 2022
761
2014 Whitewater River Region WQMP
Microtel
V. Best Management Practices
This project implements Best Management Practices (BMPs) to address the Pollutants of Concern that may potentially be generated from the use of the Underground Infiltration Chambers. These BMPs have been selected and implemented to comply with Section 3.5 of the WQMP Guidance document, and consist of Site Design BMP concepts, Source Control, LID/Site Design and, if/where necessary, Treatment Control BMPs as described herein.
V.1 SITE DESIGN BMP CONCEPTS, LID/SITE DESIGN AND TREATMENT CONTROL BMPs
Local Jurisdiction Requires On -Site Retention of Urban Runoff:
Yes
The project will be required to retain Urban Runoff onsite in conformance with local ordinance (See Table 6 of the WQMP Guidance document, "Local Land use Authorities Requiring Onsite Retention of Stormwater). The LID/Site Design measurable goal has thus been met (100%), and Sections V.1.A and V.1.B do not need to be completed; however, retention facility design details and sizing calculations must be included in Appendix F, and '100%' should be entered into Column 3 of Table 6 below.
No ❑ Section V.1 must be completed.
This section of the Project -Specific WQMP documents the LID/Site Design BMPs and, if/where necessary, the Treatment Control BMPs that will be implemented on the project to meet the requirements detailed within Section 3.5.1 of the WQMP Guidance document. Section 3.5.1 includes requirements to implement Site Design Concepts and BMPs, and includes requirements to address Pollutants of Concern with BMPs. Further, sub -section 3.5.1.1 specifically requires that Pollutants of Concern be addressed with LID/Site Design BMPs to the extent feasible.
LID/Site Design BMPs are those BMPs listed within Table 2 below which promote retention and/or feature a natural treatment mechanism; off -site and regionally -based BMPs are also LID/Site Design BMPs, and therefore count towards the measurable goal, if they fit these criteria.
This project incorporates LID/Site Design BMPs to fully address the Treatment Control BMP requirement where and to the extent feasible. If and where it has been acceptably demonstrated to the local land use authority that it is infeasible to fully meet this requirement with LID/Site Design BMPs, Section V.1.B (below) includes a description of the conventional Treatment Control BMPs that will be substituted to meet the same requirements.
In addressing Pollutants of Concern, BMPs are selected using Table 2 below.
June 6, 2022
762
1-8
2014 Whitewater River Region WQMP
Microtel
Table 2. BMP Selection Matrix Based Upon Pollutant of Concern Removal Efficiency (1) (Sources: Riverside County Flood Control & Water Conservation District Design Handbook for Low Impact Development Best Management Practices, dated September 2011, the Orange County Technical Guidance Document for Water Quality Management Plans, dated May 19, 2011, and the Caltrans Treatment BMP Technology Report, dated April 2010 and April 2008)
Pollutant of
Concern
Landscape Swale2, 3
Landscape Stripe, 3
Biofiltration
(with underdrain)e, 3
Extended Detention
Basin2
Sand Filter Basin2
Infiltration Basin2
Infiltration Trench2
Permeable
Pavements
Bioretention
(w/o underdrain)2,3
Other BMPs Including
Proprietary BMPs4,s
Sediment &
Turbidity
M
M
H
M
H
H
H
H
H
Varies by Products
Nutrients
L/M
L/M
M
L/M
L/M
H
H
H
H
Toxic Organic
Compounds
M/H
M/H
M/H
L
L/M
H
H
H
H
Trash & Debris
L
L
H
H
H
H
H
L
H
Bacteria & Viruses
(also: Pathogens)
L
M
H
L
M
H
H
H
H
Oil & Grease
M
M
H
M
H
H
H
H
H
Heavy Metals
M
M/H
M/H
L/M
M
H
H
H
H
Abbreviations:
removal efficiency M: Medium removal efficiency H: High removal efficiency assessment and updating of the guidance provided by this table may be necessary. when designed in accordance with the most current edition of the document, "Riverside River Region Stormwater Quality Best Management Practice Design Handbook". dependent upon design which includes implementation of thick vegetative cover. Local water and/or landscaping requirements should be considered; approval is based on the discretion of the authority.
stormwater treatment devices as listed in the CASQA Stormwater Best Management Practices other stormwater treatment BMPs not specifically listed in this WQMP (including proprietary filters, separators, inserts, etc.), or newly developed/emerging stormwater treatment technologies. should be based on evaluation of unit processes provided by BMP and available testing is based on the discretion of the local land use authority. for primary treatment as opposed to pre-treatment, requires site -specific approval by the local land use L: Low
Notes:
(1) Periodic performance
(2) Expected performance
County, Whitewater
(3) Performance
conservation
local land use
(4) Includes proprietary
Handbooks,
hydrodynamic
(5) Expected performance
data. Approval
(6) When used
authority.
June 6, 2022
763
1-9
2014 Whitewater River Region WQMP
Microtel
V.1.A SITE DESIGN BMP CONCEPTS AND LID/SITE DESIGN BMPS This section documents the Site Design BMP concepts and LID/Site Design BMPs that will be implemented on this project to comply with the requirements detailed in Section 3.5.1 of the WQMP Guidance document.
• Table 3 herein documents the implementation of the Site Design BMP Concepts described in sub -sections 3.5.1.3 and 3.5.1.4.
• Table 4 herein documents the extent to which this project has implemented the LID/Site Design goals described in sub -section 3.5.1.1.
June 6, 2022
764
1-10
2014 Whitewater River Region WQMP
Microtel
Table 3. Implementation of Site Design BMP Concepts
Included
Brief Reason for BMPs
Indicated as No or N/A
Design
Concept
Technique
Specific BMP
Yes
No
N/A
Site Design BMP Concept 1
Minimize Urban
Runoff,
Minimize
Impervious
Footprint, and
Conserve
Natural Areas
(See WQMP
Section 3.5.1.3)
Conserve natural areas by concentrating or clustering
development on the least environmentally sensitive portions of a site while leaving the remaining land in a natural, undisturbed condition.
❑
❑
The project is a "Small Development" and
the whole site is being developed in
compliance with City Land Use Regulations
I
Conserve natural areas by incorporating the goals of the Multi- Species Habitat Conservation Plan or other natural resource plans.
The project is a "Small Development" and
the whole site is being developed in
compliance with City Land Use Regulations
Preserve natural drainage features and natural depressional storage areas on the site.
❑
❑
There are no existing drainage features and
natural depressional storage areas on the site.
/1
Maximize canopy interception and water conservation by
preserving existing native trees and shrubs, and planting additional native or drought tolerant trees and large shrubs. ❑
❑
There are no existing native trees to preserve,
however drought tolerant species will be
planted.
EI
Use natural drainage systems.
❑
❑
An underground infiltration chamber system is
proposed
/1
Where applicable, incorporate Self -Treating Areas
❑
❑
0 Where applicable, incorporate Self -Retaining Areas
❑
❑
infiltration chamber enough to
treat generated runoff.
I Incorporated
Increase the building floor to area ratio (i.e., number of stories above or below ground).
❑
❑
I
Construct streets, sidewalks and parking lot aisles to minimum ❑
❑
Existing Street Section.
widths necessary, provided that public safety and a walkable environment for pedestrians are not compromised.
.1
Reduce widths of streets where off-street parking is available. ❑
❑
Existing Street Section.
/1
Minimize the use of impervious surfaces, such as decorative concrete, in the landscape design.
❑
❑
Incorporated Infiltration Basin BMP that is
approved by the City
/1
Other comparable and equally effective Site Design BMP
concept(s) as approved by the local land use authority (Note:
Additional narrative required to describe BMP and how it addresses site design concept).
❑
❑
Incorporated Underground Infiltration
Chamber BMP that is approved by the City
June 6, 2022
765
2014 Whitewater River Region WQMP
Microtel
Table 3. Site Design BMP Concepts (continued)
Included
Brief Reason for Each BMP
Indicated as No or N/A
Design
Concept
Technique
Specific BMP
Yes
No
N/A
Site Design BMP Concept 2
Minimize
Design residential and commercial sites to contain and infiltrate roof runoff, or direct roof runoff to landscaped swales or buffer areas. ❑
@
Drain impervious sidewalks, walkways, trails, and patios into adjacent landscaping.
❑
1 Incorporate landscaped buffer areas between sidewalks and streets. ❑
❑
/1
Existing Street Section
Use natural or landscaped drainage swales in lieu of underground piping or im perviously lined swales.
❑
Incorporated Infiltration Basin
/1
Where soil conditions are suitable, use perforated pipe or gravel filtration pits for low flow infiltration.
❑
®
Incorporated Infiltration Basin
Maximize the permeable area by constructing walkways, trails, patios, ❑
I
Incorporated Infiltration Basin
overflow parking, alleys, driveways, low -traffic streets, and other low - traffic areas with open jointed paving materials or permeable surfaces such as pervious concrete, porous asphalt, unit pavers, and granular materials.
Directly
Connected
Impervious
Area
(See WQMP
Section
3.5.1.4)
Use one or more of the following:
Rural swale system: street sheet flows to landscaped swale or gravel shoulder, curbs used at street corners, and culverts used under driveways and street crossings.
❑
❑
Existing Street Section
/1
Urban curb/swale system: street slopes to curb; periodic swale inlets drain to landscaped swale or biofilter.
❑
❑
Existing Street Section
11 Dual drainage system: first flush captured in street catch basins and discharged to adjacent vegetated swale or gravel shoulder; high flows connect directly to MS4s.
❑
❑
Existing Street Section
.1
Other comparable and equally effective Site Design BMP concept(s) as approved by the local land use authority (Note: Additional narrative required to describe BMP and how it addresses site design concept). ❑
❑
Incorporated Infiltration Basin BMP that is
approved by the City
/1
Use one or more of the following for design of driveways and private residential parking areas:
Design driveways with shared access, flared (single lane at street), or wheel strips (paving only under the tires).
❑
Incorporated Infiltration Basin
��
Uncovered temporary or guest parking on residential lots paved with a -permeable surface, or designed to drain into landscaping. ❑
Incorporated Infiltration Basin
0 June 6, 2022
766
1-12
2014 Whitewater River Region WQMP
Microtel
Table 3. Site Design BMP Concepts (continued)
Technique
Minimize
Directly
Connected
Impervious
Area
(See WQMP
Section
3.5.1.4)
June 6, 2022
Specific BMP
Other comparable and equally effective Site Design BMP concept(s) as approved by the local land use authority (Note: Additional narrative required to describe BMP and how it addresses site design concept).
Included
Brief Reason for Each BMP
Indicated as No or N/A
Incorporated Infiltration Basin
Use one or more of the following for design of parking areas:
Where landscaping is proposed in parking areas, incorporate parking area landscaping into the drainage design.
Overflow parking (parking stalls provided in excess of the Permittee's minimum parking requirements) may be constructed with permeable pavement.
Other comparable and equally effective Site Design BMP (or BMPs) as approved by the local land use authority (Note: Additional narrative required describing BMP and how it addresses site design concept). 767
incorporated Infiltration Basin
No overflow Parking
Incorporated Infiltration Basin
1-1 3
2014 Whitewater River Region WQMP
Microtel
Project Site Design BMP Concepts:
Incorporated Infiltration Basin for 100% capture volume.
Alternative Project Site Design BMP Concepts:
N/A
June 6, 2022
768
1-14
2014 Whitewater River Region WQMP
Microtel
Table 4. LID/Site Design BMPs Meeting the LID/Site Design Measurable Goal (1)
DRAINAGE
SUB -AREA
ID OR NO.
(2)
LID/SITE DESIGN BMP
TYPE*
(See Table 2)
(3)
POTENTIAL POLLUTANTS
OF CONCERN WITHIN
DRAINAGE SUB -AREA
(Refer to Table 1)
(4)
POTENTIAL
POLLUTANTS
WITHIN SUB-
AREA CAUSING
RECEIVING
WATER
IMPAIRMENTS
(Refer to Table 1)
(5)
EFFECTIVENESS
OF LID/SITE
DESIGN BMP AT
ADDRESSING
IDENTIFIED
POTENTIAL
POLLUTANTS
(U, L, M, H/M, H; see
Table 2)
(6)
BMP MEETS
WHICH
DESIGN
CRITERIA?
(Identify as
VBMP OR QBMP)
(7)
TOTAL
AREA
WITHIN
DRAINAGE
SUB -AREA
(Nearest 0.1 acre)
DA I
INFILTRATION BASIN
PATHOGENS
PATHOGENS
H/M
Vbmp
4.2 TOTAL PROJECT AREA TREATED WITH LID/SITE DESIGN BMPs (NEAREST 0.1 ACRE) * LID/Site Design BMPs listed in this table are those that completely address the 'Treatment Control BMP requirement' for their drainage sub -area.
June 6, 2022
769
1-15
2014 Whitewater River Region WQMP
Microtel
Justification of infeasibility for sub -areas not addressed with LID/Site Design BMPs N/A
V.1.B TREATMENT CONTROL BMPs
Conventional Treatment Control BMPs shall be implemented to address the project's Pollutants of Concern as required in WQMP Section 3.5.1 where, and to the extent that, Section V.1.A has demonstrated that it is infeasible to meet these requirements through implementation of LID/Site Design BMPs.
The LID/Site Design BMPs described in Section V.1.A of this project -specific WQMP completely address the 'Treatment Control BMP requirement' for the entire project site (and where applicable, entire existing site) as required in Section 3.5.1.1 of the WQMP Guidance document. Supporting documentation for the sizing of these LID/Site Design BMPs is included in Appendix F. *Section V.1.B does not need to be completed. ❑ The LID/Site Design BMPs described in Section V.1.A of this project -specific WQMP do NOT completely address the 'Treatment Control BMP requirement' for the entire project site (or where applicable, entire existing site) as required in Section 3.5.1.1 of the WQMP. *Section V.1.B must be completed.
The Treatment Control BMPs identified in this section are selected, sized and implemented to treat the design criteria of VBAR and/or QBMp for all project (and if required, existing site) drainage sub- areas which were not fully addressed using LID/Site Design BMPs. Supporting documentation for the sizing of these Treatment Control BMPs is included in Appendix F.
June 6, 2022
770
1-16
2014 Whitewater River Region WQMP
Microtel
Table 5: Treatment Control BMP Summary
(1)
DRAINAGE
SUB -AREA
ID OR NO.
(2)
TREATMENT
CONTROL BMP
TYPE*
(See Table 2)
(3)
POTENTIAL
POLLUTANTS OF
(4)
POTENTIAL
POLLUTANTS
(5)
EFFECTIVENESS OF
TREATMENT
CONTROL BMP AT
ADDRESSING
IDENTIFIED
POTENTIAL
POLLUTANTS
(U, L, M, H/M, H; see Table
2)
(6)
BMP MEETS
WHICH
DESIGN
CRITERIA?
(Identify as
VBMP OR QBNIP
(7)
TOTAL
AREA
WITHIN
DRAINAGE
SUB -AREA
(Nearest 0.1
acre)
CONCERN WITHIN
DRAINAGE SUB -AREA
(Refer to Table 1)
WITHIN SUB -AREA
CAUSING
RECEIVING
WATER
IMPAIRMENTS
(Refer to Table 1)
DA 1
INFILTRATION BASIN
PATHOGENS
PATHOGENS
H/M
Vbmp
1.36 TOTAL PROJECT AREA TREATED WITH TREATMENT CONTROL BMPs (NEAREST 0.1 ACRE) June 6, 2022
771
1-17
2014 Whitewater River Region WQMP
Microtel
V.1.C MEASURABLE GOAL SUMMARY
This section documents the extent to which this project has met the measurable goal described in WQMP Section 3.5.1.1 of addressing 100% of the project's 'Treatment Control BMP requirement' with LID/Site Design BMPs. Projects required to retain Urban Runoff onsite in conformance with local ordinance are considered to have met the measurable goal; for these instances, '100%' is entered into Column 3 of the Table.
Table 6: Measurable Goal Summary
(1)
Total Area Treated with
LID/Site Design BMPs
(2)
Total Area Treated with
Treatment Control BMPs
(3)
% of Treatment Control BMP
Requirement addressed with
LID/Site Design BMPs
(Last row of Table 4)
(Last row of Table 5)
4.2 4.2
100
772
June 6, 2022
1-18
2014 Whitewater River Region WQMP
Microtel
V.2 SOURCE CONTROL BMPs
This section identifies and describes the Source Control BMPs applicable and implemented on this project.
Table 7. Source Control BMPs
BMP Name
Check One
If not applicable, state
brief reason
Included
Not
A licable
Non -Structural Source Control BMPs
Education for Property Owners, Operators,
Tenants, Occupants, or Employees
❑
A
Activity Restrictions
❑
//
Irrigation System and Landscape Maintenance
❑
1 Common Area Litter Control
❑
A/
Street Sweeping Private Streets and Parking Lots
❑
/1
Drainage Facility Inspection and Maintenance
❑
/1
Structural Source Control BMPs
Storm Drain Inlet Stenciling and Signage
❑
AI
Landscape and Irrigation System Design
❑
/1
Protect Slopes and Channels
❑
No Slo Des and channels
/1
Provide Community Car Wash Racks
❑
No Community Car
Wash Racks
/1
Properly Design*:
Fueling Areas
❑
Not a project feature
/1
Air/Water Supply Area Drainage
❑
Not a project feature
/1
Trash Storage Areas
❑
AI
Loading Docks
❑
Not a project feature
/1
Maintenance Bays
❑
Not a project feature
/1
Vehicle and Equipment Wash Areas
❑
Not a project feature
//
Outdoor Material Storage Areas
Not a project feature
Outdoor Work Areas or Processing Areas
❑
Not a project feature
/1
Provide Wash Water Controls for Food
Preparation Areas
❑
Not a project feature
@
*Details demonstrating proper design must be included in Appendix F. 773
June 6, 2022
1-19
2014 Whitewater River Region WQMP
Microtel
BMP
IMPLEMENTATION
Education Materials
Each employee will initially be provided with a copy of the included handouts.
Stenciling
The catch basins will be stenciled (prior to acceptance by city) with "NO DUMPING: DRAINS TO RIVER)
Landscape and irrigation design
Initial landscape design will include drought -tolerant species requiring limited irrigation. Irrigation systems will be
designated as water -conservation type.
Common Area Litter Control
Standard on -going maintenance will control litter
Street Sweeping Private Streets and Parking
Lots
Quarterly , driveways and parking lot sweeping
will be implemented as needed
Drainage Facility Inspection and Maintenance
The drainage facilities will be inspected and
maintained as part of standard landscaping
maintenance
Appendix D includes copies of the educational materials (described in Section 3.5.2.1 of the WQMP Guidance document) that will be used in implementing this project -specific WQMP. 774
June 6, 2022
1-20
2014 Whitewater River Region WQMP
Microtel
V.3 EQUIVALENT TREATMENT CONTROL BMP ALTERNATIVES
N/A
V.4 REGIONALLY -BASED BMPS
N/a
775
June 6, 2022
1-21
2014 Whitewater River Region WQMP
Microtel
VI. Operation and Maintenance Responsibility for
BMPs
Appendix G of this project -specific WQMP includes copies of CC&Rs, Covenant and Agreements, BMP Maintenance Agreement and/or other mechanisms used to ensure the ongoing operation, maintenance, funding, transfer and implementation of the project -specific WQMP requirements.
Operation and Maintenance:
Site Design BMPs
p�
❑
❑r❑❑❑❑❑m
M ❑L -
❑ ❑❑ r ❑❑ETr❑ r❑❑❑ m
I II II 1 ❑ Dirt
❑ ❑❑❑
R ❑ ❑ ❑ f I TTri TTT❑ ❑ ❑I11T❑❑❑❑I ❑
d Ell ❑❑ ❑❑ II El �❑ �❑
® mid] I ❑
[W®d ®❑ TE[ I ❑❑d. d ELM r❑❑ El CD
m
Thai ❑T❑r❑❑
❑❑❑ rL El ❑❑� ❑ ❑
❑ ❑❑ CMI ❑❑ El -MI ❑iu," ❑ EM
❑� ®❑❑ ❑❑❑ ❑ ❑®
Dalr❑❑❑© Loam= ❑Tii i ❑❑
C❑❑I ❑ �❑ r❑❑ ❑ ❑❑ d
MEd al
❑ ❑❑❑❑r❑ Ed E -❑❑d
Ed ®❑❑
M ❑I ❑❑❑❑
[ft ❑ I❑ ❑❑d ElED-
RED ❑ [IA ❑❑ ❑ ❑®H❑❑❑ El
M =ELL
�®d TOE L❑ ❑❑d d ❑❑r®r❑❑ ❑ ®
E ❑❑ LED CODED D-❑ ENV' ❑❑]❑EE
man=
❑❑
®❑dminr❑❑
❑ ❑ MILE TEED ❑❑d
r❑❑ ❑d ❑�❑ ❑
❑❑d r❑❑❑© Irr[❑m❑ ❑ m
❑dd®❑❑ El D dr❑❑❑❑❑
❑❑❑d al
L❑r❑❑ r❑❑❑ CIA ❑I7❑❑
I r❑❑
MID=
R ❑❑ 1❑ liEld ❑❑ ❑ ❑ EM In ❑
FE d®❑ TE ❑❑d d ❑D -® r❑❑ ❑ ®
❑❑❑❑
❑ ❑❑❑Ir❑Ar❑=❑❑❑
CIE ®�L
❑❑
I ❑ I
❑ ❑❑ ED❑ ❑ D ❑ ❑ICfi" man
❑❑d r❑❑❑o ❑❑VEDE ❑ ❑ ❑❑
❑❑❑d ❑d
Wild ❑U❑
❑❑❑ r❑ r❑ II1d❑❑❑LLE
❑❑❑❑
❑❑d ❑D' ❑ �m ❑ n
M EDUCE
❑ ®® Ell ❑ d �❑ ❑❑
R
R ❑❑�❑ HA WJ❑❑ El ❑ EDO El IID
I El
=®d LEE TIE ❑❑d d ❑D -®r❑❑ ❑ ❑
❑❑
❑r❑ dal �❑ II ❑❑ i
ME
❑❑d ❑ ❑ ❑ ❑n ❑❑ r1❑ II ME DEEM
oat
Er ❑❑d.❑ r®❑❑ ® ❑
❑ D-❑❑ LEEd ❑
Dim' ❑❑
M ®E ®❑ ❑ ❑❑
❑ EM
X 11 J
M EMT
® ❑D'�1❑❑ I r®I
RED= ®al ❑❑ ❑ ❑❑❑❑❑❑❑ ❑
❑❑
❑❑❑
❑❑d
=®d TEED o❑ ❑D1 d ❑D`U r❑❑ ❑ ❑
❑❑ d ❑LIA* ❑ ❑D-❑LII
LI❑ ❑ E d ❑❑ d ❑ M=
776
June 6, 2022
1-22
2014 Whitewater River Region WQMP
Microtel
hardscape
❑ ❑❑ ❑ D' I IL ❑ [ ❑
M ❑❑M❑
d ❑M❑❑d M ❑ WE ❑❑d
M LILLd r❑❑1❑❑❑ D -❑❑❑d ❑❑A M❑
❑ ❑❑❑
ED IIr❑M r❑Mr❑MMr d frl❑❑L
❑❑d r❑d ©❑ ❑ ❑ Ii r❑ M
®rnM>m ❑
❑❑
r❑❑D-MMW m❑❑L❑W1❑
End ❑❑d D-❑❑❑ ❑❑d
I ❑= E1 ❑❑11lt ❑'❑M
1 ❑®I
®❑d ❑E❑
❑ IDE
LE ❑ r r❑[❑❑❑ �p❑❑d Ent I❑❑
Drum d ❑❑ ❑
❑❑d r❑d ©❑LLtf❑ ❑ UJLJJ_r❑ L❑
1 L 11 I❑
❑❑
M ❑❑MR
❑ ❑ 11 �❑ ❑❑d M❑
End rmr l❑d Er EDE ❑❑d m❑❑®�
�� al ® ❑I_I ll�_d IT❑�❑�❑
❑lM
❑1nd DUD
M ❑ ITE
LID r ❑ a Ml lmd ❑❑d
R ❑❑M❑ [LI d w MW ❑ ❑ u ❑ ❑
❑ ❑❑❑
❑❑ r ❑r❑❑❑ p❑M ❑❑❑
® M®❑
❑❑
TDMld ®❑ r❑ L ❑❑d d ❑❑rn r❑❑ ❑ [ID
❑ OE= LM❑❑ D-❑ Om" ❑=
❑d ❑❑❑ ❑❑d I r❑❑RTr-
❑❑d r❑❑❑© ❑❑[-rrIIDMM ❑ ❑❑
[W❑d ❑M❑
❑❑Dd Ed
❑ ❑❑ r❑ I❑ MEd D❑
R I❑ I I I ❑ ®❑d ❑❑ ❑ ❑Mm❑❑❑ ❑
❑ EEE
M ❑❑MI[i
Er DM D' d ❑M❑ ❑ EL 11111 LE
-'_ Ed HET= ❑❑d d ❑ErE r❑❑ LIME
D ❑J1❑❑�
❑ ❑❑ E❑ =ED Lr❑m ❑us"
❑❑
®Dr❑❑M ❑M1 M❑ 0 Er
M u -❑®❑ I ❑ ❑ FT I
❑❑d r❑❑❑© ❑❑©-EI❑M❑ ❑ ❑❑
Cm❑d ❑=❑
I I r iDITM II Ti
❑❑❑d ❑d
1 r❑D-E= I❑❑ ❑ EFFTTTI0TTI.
❑ ❑❑❑
LE MM❑
❑❑
R ❑❑ ❑ [End ❑❑ ❑ ❑®®❑❑❑ ❑
M ❑ 0 ❑Q
❑ r❑❑❑❑ =LIMA ❑1
Th d [❑ r❑ I ❑❑d d ❑Dry r0❑ ❑ di
❑[IIr❑M❑M❑ ErLim EM
❑ ❑❑ [W❑ ❑❑ EE ❑ICs" ❑=
®❑d ❑LID❑ ❑❑d dr❑®❑❑❑
❑❑d r❑❑❑© ❑❑❑rrI❑M❑. I❑ ❑❑
®❑d ❑I❑
❑E❑
❑❑❑d Ed
Source Control BMPs
Er CODED !
❑` i 1 i1 !
Ed ❑ M❑ ❑ r❑❑D-M
r JIld ❑ ❑d ❑ M❑❑ I M -® NE ❑
❑ ❑❑❑
ILIIM Tr
❑❑ Mr M
❑®❑ ED- El
M❑❑=
❑ ❑❑❑
LMd II ❑ D' II I ❑ M
❑ aid Dt [❑d IEIRE ❑ ❑ThM❑M
M ❑ ❑
=EDE ❑❑d I ❑❑❑❑M
❑ r HE [❑I r❑❑ ❑ Ell
® MM❑
❑❑
D -❑❑D' r❑❑Th ❑ ❑❑ ElI❑❑d EWE
❑❑ ❑❑❑d ❑d a Ed r❑❑❑[r TE0 ❑ =❑
®❑d ❑o❑
❑ ❑❑D1 ❑❑M [ID ❑ II M❑ =Eli
❑
777
June 6, 2022
1-23
2014 Whitewater River Region WQMP
Microtel
M ❑❑ HI
MD
E ❑m E rrLulwm
❑ �❑d
Lrd ❑ ❑LE❑❑IJIW Li [1
111110111111110
Imo❑
❑❑
IDDu
r❑ ❑❑ ❑m -LL Ear= LW®
❑ DEICED ❑❑ ED -d 1-m❑❑❑
Ill❑d ❑U❑
❑ ❑❑❑
LED- MET ml: ri r❑❑❑
❑ EA D'd [MEd DIEM ❑ ❑❑]IB❑❑❑
CM
❑ ❑❑
❑D
DEMI
❑❑❑J❑ ❑❑❑
❑❑d
❑D d ❑❑
ME
❑Ellii
Er DM r❑❑❑ D'1 ❑
❑=❑dOrd [ID❑dI f EIIIIIICITITTLIFIE
❑ ❑❑I [ITh1
❑ Ir❑
Et DE
❑ ❑D-Eir HD I
❑ ❑❑❑
ElE❑d ❑rd ®❑d I IDE II❑mLI❑❑❑
ETITTTITTTIO
Dr DEMO ❑TI❑I ThTI EI1TT1TTm1❑
❑ud M❑IMEDE
oakum
❑II ❑❑L
❑ ❑❑❑
® EH=
® ❑I i M i i p i ❑❑❑TT1 mom®
❑ ❑� ❑ Dr❑� ❑ �❑ ❑
❑ ❑❑❑❑ it
CID ❑❑TTr❑ ❑LM❑ m m u m❑
End r❑m
Treatment Control BMPs
I I r
E it r ❑all❑ ❑ ❑
❑ui o ❑❑d M ❑mom❑❑❑m ❑ ❑
❑ EEC!
❑ End ❑ ❑D'Eld m ❑ ❑❑ m❑❑❑ Dal
[RUM ❑
❑T❑m❑ ❑iErH❑ d Er HE dr❑❑❑❑❑
❑❑
❑_Ld m D'❑ I ❑ ❑m❑dH❑ I ❑ ErED I
ACM LEE
❑D1. ErEE ❑D1 ❑D-❑] ❑❑d ❑m ❑❑Q
❑ I ❑ EllEd ri TO ❑❑❑ ❑❑A ❑❑
r❑❑ ❑md ❑ ❑❑❑❑ II ❑❑❑ ❑❑E I❑ ❑C
ter[ II II r❑ ❑❑d ❑ II Ci ❑❑ W❑❑[d ❑❑
❑ mm EEC ❑D'❑®❑ ❑D1 ❑ ❑m®❑❑❑
E ❑❑❑❑mom❑❑dLLIW❑ r
❑❑I ❑ ❑❑rid ED❑ ❑ ❑❑nm
778
June 6, 2022
1-24
2014 Whitewater River Region WQMP
Microtel
VII. Funding
Funding for the on -going operation and maintenance of the project WQ BMPs will be incorporated into standard site landscaping maintenance paid by owners of private areas.
Funding source for the operation and maintenance of each BMP within the WQMP is listed below:
FARHAD ZOMORADI
P.O. BOX 10544
BEVERLY HILLS, CA. 91208
(310) 428-2875
779
June 6, 2022
1-25
2014 Whitewater River Region WQMP
Microtel
Appendix A
Conditions of Approval
TO BE INCLUDED IN FINAL WQMPs
Planning Commission Resolution N/A
780
2014 Whitewater River Region WQMP
Microtel
Appendix B
Vicinity Map, WQMP Site Plan, and Receiving Waters Map
781
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
LEGEND U M
A DENSE GROUNDCOVER VEGETATION
���
• - - ,':
p WATER -TOLERANT GRASS
RAMON ROAD
• '
- :„ . . .. . .. ,• . . .
s.- •^ � •'
DENOTES CONCRETE AREA =
LENGTH=118' MAX. 3/8" JOINT FILLED WITH CRUSHED ROCK COVER : :' , ; :. ;'
O?39/
WIDTH=50' MAX. PERMEABLE PAVERS
(GRAY COLOR)
GHQ
p FIN. GRADE
VEGETATED
FIN. GRADE
is
FF
D
DENOTES PERVIOUS AREA s T O
�. j
k
12" DEPTH GROWING MEDIUM, NON -CLAY
qr
STORM DRAIN INLET STENCIL ��
2" SAND LAYER
OR PERMEABLE SOIL, 75% COMPACTION
O N.T.S.
SITE
SD -13
NATIVE
_
V
SOIL _ , ,{
GEOTEXTILE FABRIC
DENOTES FUTURE BUILDING AREA
��� ��_
DINAH SHORE
DRIVE
6' 1.4
34' MAX.
6' I���`� r_
r_�
12" DEEP GRAVEL BED (1" DIA.) o
zVI TORY
DR.
sai ob.
Au
MIN.
MIN. 44)..„, tP t cf./0R,, tr- t
--11-111-111-111=111-11-111-111-I
>-
a
INFILTRATION BASIN (NOT I I -I I -III -111 -111 -111 -III -I I-111-111
TO SCALE)
I
SUBGRADE 95% COMPACTED CONCRETE PAD
a
W
. . . . . . . . . . . . . . : : : ' :
DENOTES ASPHALT PAVING 1
I I I I I I -III -III -III -III -I � 111=111=11
GINGER
ROGERS
RD.
0 CAPACITY = 5, 161 C.F.
LLI
BMP NOTES POROUS PAVER DETAIL,
SD -11
RESDEN 1AL TRASH STORAGE, SD -32
o
VIA
MARTA
s
GERALD FORD
DRIVE
01 TC-1 1, INFILTRATION BASIN ROOF RUNOFF SPLASH
20 SD -12, EFFICIENT IRRIGATION
03 SD -10, SITE DESIGN AND LANDSCAPE PLANNING
® SD -11, SPASH PAD, ROOF RUNOFF CONTROL
05 SD -21, ALTERNATIVE BUILDING MATERIALS
PAD (2'X3') ® ON 3.5'x3.5' PCC PAD N.T.S.
o
m
VICINITY
M A P
© SD -32, TRASH STORAGE AREA
O SD -13, STORM DRAIN SIGNAGE
NTS
® MP -52, CATCH BASIN INSERT FILTER
OVERVIEW
The Bio Clean if PSC' (Correct -Dr Pipe 'Screen) is designed _nu:time existing catch bestni el hawing thern tc efficienelycapture100 roftrash and debris.
The bio Clean CPS technology car be retrofitted irto any curb or drop inlet to help municipalities meet current stem' water •egulations and comply with the 71JPDEIS or fy1S4 permit, Elio C can CRS deices car be usec for new site developments as tie first line cf defense to prevent trash and cebris from reach in€ water unnecessary maintenance. , a burdens.
low truster from 100%ElV1P er theyst n cause cloggingand m isfeasible, atilt :.orstructed fr m 10C - °0 performed stainless steel, t system fca rhl - effective, and aallttc last. d,n rr nurative curved. d Igrr with multiple cross suf ensures the device sign with St2nd several -
- port;
hundi l leardtlae sse blLon Aidethe
snd rfm s ir ilexceedingertth u pbrs-inch requirement m rmanacle Itsmo modular
b modslar design net Rery[ Inert througha ylnchdl neterrna ittOarch assemble. the a
665i �>
LAE
\
E
lut pe
7_esuE '4g niche', r granites For catch basin with plans xltnsintt-c rr er, the system sr easily lac ada t n L shape J singe srrEle corner anda sir center l. ._e.
CtZ
—)—.1
nand piece El_ p
Qeier +
Reinforcement Bracket
Perforated Stainless Steel Panels
m L
-
'•'-a•'
..
-:
G
APING
LAN-DSCA G
_
i i _.....„____A,,__
i i i Jr Jr i
t*4'*4'4.'*'*4'*'*4'*'*'* 4.4'*4'*14'2 04'4'*'4.' ff *
i
lrg th 5mm �, `-•.�^'.. {
~��\ "
i i i i i i
i i i i i i i i i i i sir i
i i i i i i i i
i i i i i i i
i i i i i i i i i i i i i i i i i i i i
i f�
• r •••"'" �••-
ADVANTAGES
°CAPTURESIDo % OF TRASH AND DEBRIS
5.V1 �M AND GREATER
7 i
i
`t'
i
NI, i i i
Jr 1 i
i i ±
ir_r^^ _
Jr `�' Vt�, �'
n
i i `L
r'Yl l I
- i sir i le
* * *
i i i i
i i i i
i i i i
i i `�' * i
"s i i i
i
i
i
O
i i 4, sir i 4. i sir i
i * i * * * i * i
i i ii� i i i
i • i i i VW i * i i
i i * * i i i i i
i i i i Jr i i i W
`' "> `�!^ i i Ii i i
4, 4, i i
* * * *
i i i * i
i i i *
i i i i
* * i
r
i i i i i
4. *
(_/�
II, 4, 4, 4, i i 4, 4, 4, i
* * i * �7 Z i * i
i i i i i i i i
•Fr i i i * i i i
i i i i i i i + *
i Jr i * - i
i °- ^S• * i i *
i 4,
i * *
i i i
i * i
i * i
J• i i i
* it *
4, i
i
i 4, i i
i i * i *
�Y i i i
i i Jr
i i i i
i i i i
'il+ i �. i
4, 4, 4, i i sir
* * * i i i i
i i i * i i
i * ®Q i + i
i i i i i i
i i i i i i i
i i i i i *
sir 4, 4, sir i i 4. 4, 4, 4, 4,
i * * * i i * * i Y *
i i i i * i i ....•4 i i i i
* i * i i i i i
i i i i i i i i i ��,♦
i Ni, i i i i i i i �,♦,♦
i i i i i * i
sir
V
CI
4, i 4, sir 4, i i
i i /7 * * * *
WC66� i i " L 3 +Y i *
i i i i i i i i
i i i + i i i
i 4, Jr * * * i
* * i i i i
i
i
�)
4. i
i
' l(ce6 STAINLESS STEEL CONSTRUCTION
UTILIZING ONLY PERFORATED METAL
CONSTRUCTION
. MODULAR DESIGN ALLOWS IT TO -
ADAPT TO PIPE SIZES RANGING
FROM 4INCHES TO 48 INCHES
° m oDULAR DESIGN ALLOWS FOR
®
I
LANDSCAPI
102.73'
i
4,
Y
i
* * * * *
F 4 4 4 * * 4 4
F 4 4 *
4 4 4 4rt
4 iL LL 4,
44I
4 RETENTION 4 * ON E
E \4 4 4 4 E1.`5E `MIN DE
7-4\
de °Y
W
i
i i i i
i i i i iI
_ � i i i �::
i i i
i i i i
i i
\
` �.
` ''' J�
�..
r, '
`
�1
* i t i i W
"4' i i i
i i
i i i y(
�1
i i i i
•.V i i i i
W
i i i
i�
i i ILA',
i i i i
i i i .µ,
7Y1 i i i
4J
i 4, 4,
i' i i i
i i i
-- .
\
i i i i
-Y i i i
i i i
i i i r ii
dLJ
4, i ,yam �
i i i
i i i
i i t. i •lr
i i
LLI
i i
4. 4, 4
s i i
* i WI
`
;
i i ..11 i i i i
i i W i i
i i i i i s i
^
i i i i i .fir
i i i i i
i i i i
i i i i i i i
i i i i i 4, ♦ ` i i i i
i i i i i i - ' ` i i i i
i i ♦ i i i. i i
/ \� �� ���,♦ ♦ ` f
�,♦�',♦,♦,♦,�'
,•i' /-� i i i i W ' i
r3 J , ♦ ` , ,
i i i i sir • i
i • i i W /
i i i i ,'�♦��♦,��� �♦/ i * i i i i
i
sir
i
i
DESIGN FLEXIBILITY
--
�,
^ Ii
`XV._
-.
i D
K.?,
I
,
OPERATION
]
r,
i
Y
i
Y
v
i i i i
i i i
i i i
i i �al�
i i •I ' 1/4�) \T!
i i i
i i i��('�
t. i i "t✓
". i i i i
i •N * i
i 4, w,
i i i
i i 4, i �'
i i i
i `-
i i i I `µ•4
* i 4,
i i i
M i i
i i
i W i i
i i
W i i t
i i Jr
i i �5
i 4, ice
,
i i i i try)
i i i i i „
i i i i i
i i i i i i
+`� i i * * i
i i i i i i i i i
r a ^�c
i i i i i i
i i i i i - // cW i i i i
i i i i i 4. i V i i i i
i i * i * * • i i i i i * * *
..
'1—
* i ii • i
: : : +
: : : : :
i i i i W
�i
i
d-
❑
i i i
i
❑
i i i i i i
i
•'
4-
,t* i i i i i
`Ct
i
v'
N
�• Y•
i * * i 4-
•.
�" i i i i
i i i i
.. .
i i i
i i -'4
•-
.:.
--'
i i i i
i i - :. i * i i i i i
* NO
i i * i
f d
i i i
i i i i
i •�
i i i i i i
i i-
& i i
i
i i i i i i i i
'
•
i
i
i i +.
•
i i i i i i i i
i i i r
i i i i i i i i
i i i
i de i
i
i 4, 4' sir i i i
6 sir4,
4,i
- '• •a
i i i`�V' 9 i sir i
i i
i * Jr * i `V • ~'
... .•
i 12' , '0, i i * * i i i i
v i i 6 L. o. I
•
. -' -
i ,. i i i i i
4,
,►•
*
i 4. 4, i
i
' `w...z'
♦♦♦♦♦,♦♦♦♦♦��,
-
if
I II
N
e f Y Y .L.J
0 1 34 E 5Q9.23
/ \
I • . L. L .
�,
W� w
i 4,
.,♦♦♦♦♦�.
♦♦ ,. ♦♦
i 4, 4, •
41 4,
` j'
II
T
��/jf
T
(te
a
a. •'•�',
�,,,,��
i i i i
•
i
i i u•
4 •
i i t i
�j
i i sir i
•i • 4 • •d
�Y i i i i
i i i i i
•,�',♦,
i i i
Treated flows enter the basin and are passed through the Bie Clean CPS 7 7
.
n{
1 ,
,
-
, i i i i
I
i i
• .
W/ i i
i i i i i i i
�•
ii
i i *
i i
•
-
i�
7 i i i i
which retains all trash and debris down t0 5 T! 5 in 5122.
O
,nlr
i i i
Jr 4,
- -'
i i i i i
i i i i i i i
•
i i i i
i i i i i Jr
i
i i 'i •f r i i i i i i i
*
`
High flows are allowed tDbypass over the top Of
. - 3 1� j"jti �.
_ i i i
i d._�—
•.
* i i i
i * * tiu vv w w
,•_ '� •:�
•'r i 4,
i i i eta .e
• -'� •
. .
N°
i i i .. ♦ J �>
i i 4, 4. i i i
th@ BIO Clean CPS during Irlf@n5e storm events. y
W [, �J
•v r
1 •-
W \ - + •f
i i
i i i i
�.. -
i
i i i
i i i i
-
1 i i * *
i it I
r- - - -
❑
i . w
* i i i * i i i
t
t
s�
i i i i i
i i i i
*
*
i *
i
i IY i
it
/..
i i i •;t•--
i * i i i * * i
��
•
- '
,
I \
CONFIGURATIONS i
-�
i i * i i
* * �?- i i
i i * * i
* * * * i *
r * 4, 41 40 4,
i i i i K
* i i 0.
ti/
i i i i i
sir 4, 4, *
4, 4, I. i *
i i i
® i i
* i
,. i * *
i * i i
* i i t i
i i I i C�
* i i * i
* 4' i 4,♦�♦♦�♦
* sir i Jr W
!
,' I
♦,♦♦♦♦♦♦,♦ I
♦♦♦♦♦♦���♦
i i Jr i
4� * i i
Y i i i
i * * *
'. * sir i *
i
i i
i * i
. i i •]j
Jr 41 4' I
.:
'•.� _q
/
i i * i
(� 4, i I * i i
i i i W i
's• * * 4, 4, 4,
4., 4' 41 4' 4,' i
.-
-•i+ .. .. >, - J..? i i i i i i i sir
i i 4, '• �, ', i ` ��----
i i * i i i * i i
* * i i i i } •,• \\o *
Ti 4, i * sir i * *
* i 4, * * '4. C�, IJ,�' 4, i 4, 4, 4, sir i
'4* 4, 4, i sir N. ` ~rr �6 . i`-' 4, 4, NI/ i * *
1 `� '�(J
",♦,.
ti
\1C LOT
i i i i i i
* i * i 2 3 i * i i
i i i i i
i i i i i
i i i i i
i i i i * i i i i
., i Jr i i
iJ i i i
,�i/JS
i i i i
* * i * i i i. (n
•V i i i �', l
i i i *CO I
w
i i i i
�i i i i i i i
r. i i i i
`i i i i
;
♦�,1���
/
i i i
,r * i i i i VJ
•r i i i ♦ NY
i i i yYl
i i i •by
Ole, i i i .I
i i s.-
�i i •d
. i i i i i
V, i i i * i * i i i i i
i i i i ,Nsv
•J. i i i i i i±r'•♦ IJ i
i i :� ' � i(� i Ole i i i i
i * i i i * i i * i i i i� ♦,��, W /'� . i * i * i i i i s i i i i i�®,♦� �`'♦�♦� . i i i i i
Lin i i i i - �,,,.,♦,♦�,�� i 7{� W i i i i
r(-Lq�.
i
i
i
+ i i i W i
W i i
i i i i
V.•,v1 i i i i
1 i i i
^' W i
4, w�iryV
i i i i 4, i \ i i i i i W
i i i i
+ Q i i i i
Jr i * i i
i i i
f i i I* i •;.
i i *
,.. ".' ' ..
J
i i i irn
i i i i CZ
i W7
�i i i i
i i i i i
i i *
♦,♦,♦I
� " •TJ ♦
I
i i
+Y i
* *
a
i •4r
i i 00
*
�i i �A
i i i
i
., '. . ,. ' '
i i i i w i
i i i i
b i i i *
`4•' i i i i ,�I��♦,,,_
i ®_ i i i i i i ♦�,,,,,� ': '
i * * i * i
''��^fIII
, 1
VI
i i i i i i i
©� i i i
* * *
O BIO CLEAN CONNECTOR PIPE SCREEN
8 ..r—.
i i i
I
i i I i i i
i i i
i i i i
i i i gi i i i i ,y
L
v i i i
I
i i i i i i Jr W
i i I i i
i i i i
i i i
I/
i
4,' 4,
W i i i
��
N.T.S.
U
/ f1
i i i i i
i * i Jr i
* * * 4, i sir
i i i i i i
Jr i ® 0i
sir i sir 4, i
i i
i *
i
i
4, i
i
i i i
6 * i *
* * i *
i i '�• i i i i i
* i i i * i i i
sir i * i * * ,• 1 sill
O
*
i i W i
�
F1 * 4. *
4, * * *
i i i i i i
t
i Jr I i i i i Jr 4
* i i i * 4, i _ +�
iii i
i i sir
((♦"7; i * i i
\`T * 4, i i
00 i i i i Vi
i i i d i i
* NI' i i i
i i,I♦� i i i i i i
i * i i i
i 4, i *
i
V
IQ
Z
Q
I
i i * i *
* i * * * *
i 4. * * i
i i * i i i
* i i i i
i i i * i *
i i i i i
i Sr i * * i
i i i i 4. i i i i
i i * i * * i * i
i i i i i i i i i i
i i i * * i i * *
i i * i i i * i
* * i * i i i i
i i i i i i i i i
le * * * i i i
i i * i *
i * i i *
i i i i i W
i * i *
* i * i i * Jr i`) i i i •.. i i i
i * i i i i * i * * * * * i i
i i i i i i i i i i i i i i i
* * * i i i * i * i * * * * i
i i i i t i i i i i i i i i i i i i i i
i i i * * 4, * i i * i i * i
i i i i i i i i i i i i i i 2 3 i i i i i
* i * * * i * i * i i i * * . i i i * *
L)
f
�•-1 J
i i
i i i •i i
i °{.Y• i i i - i i i i i
i i i i i i Z)
i i + r• •✓" i .----,..---.> i
Oi ® Cr'
I
1 Q
i i i i i i
i i i i i i i i i i i 4, i i * i i i i i IY
i i i i i i 'Y i i i i i i i
i i i i i i i i W `�J i i i i i i i
-+IR -
Q
N
0 E 6653
„...,
\
O O
-I
�
.41,16
eL
GRAPHIC SCALE 1"= 30'
30 0 30 60 90
S.D.
ENGINEERING AND ASSOCIATES
REVISION DESCRIPTION
DATE
ENGR.
CITY
DATE
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS
TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.
7Q")
BENCHMARK: CITY BM #PD 18-5
BEING A 1-1/2" COPPERWELD IN ASPHALT, FLUSH, AT THE
CENTERLINE INTERSECTION OF BOB HOPE DRIVE AND
DINAH SHORE DRIVE.
ELEV. = 347.672
CITY OF RANCHO MIRAGE, CALIFORNIA
FESS1O,yq
p
ITREV.
PRELIMINARY WQMP SITE MAP
9 ti
cx
9 �S" DOd4 <A,I_
�� 9
N❑. 36361 in
EXP. 6-30-24
�T CIVIL .Y
ri
LAND PLANNING AND CIVIL ENGINEERING
242 E. AIRPORT DRIVE, STE. 212 - SAN BERNARDINo, CA 92408 PHONE (909) 215-3451 EMAIL: [email protected]
DRAWN BY:
EB
TENTATIVE TRACT MAP N0. 38636 "=2a'
SCALE:
�;�_`
�!
DESIGNED BY:
EB
72094 GINGER ROGERS ROAD
DATE:
4/28/23
IAL jjj
/
EFORE /TWO
`�Y, DAYS DIG
OU DIG YOU DIG
CHECKED BY:
SD
DRAWING NO.:
1 i
TOLL FREE 1-boo-227-26OO
A PUBLIC SERVICE BY
9 or C AQ
SURESH DODDIAH R.C.E. 36361 DATE
UNDERGROUND SERVICE ALERT
mo
n
v
3 rn
cP
Janaoad 1YNOLLr3Aa3)Is]aolflV NM AS a30naoad
E
❑❑❑r R
r
R ❑❑®❑ ❑ ❑ M ❑ ❑ ❑Cd ❑❑
NdTffd WdYe'C
MON TGOMERY<CREEK
SMITH CREEK
AZALEA CREEK'
TWIN PINES CREEK'
BROWN CREEK
Figure 2. Whitewater River Region Receiving Waters Map
BIG MOR,ONGO CREEK
SAN GORGONIOIRIVER
SNOW CREEK
WHITEWATER MS4 PERMIT BOUNDARY
WHITEWATER RIVER WATERSHED BOUNDARY
-"--- - RECEIVING WATERS - LINES
RECEIVING WATERS - POLYS
COUNTY BOUNDARY
cCHINO CANYON CREEK
WILLOW CREEK
WEST MAGNESIA CANYON CHANNEL
1 PALM VALLEY STORM WATER CHANNEL
1 GRAPEVINE,CANTON CREEK
Tln
WEST CATHEDRAL CANYON CHANNEL
SITE
0 LITTLE MORONGO CREEK
CARRIZO CREEK'
r--- THOUSAND PALMS CANYON CREEK
DEEP CANYON STORM WATER CHANNEL
LAKE
CAHUILLA
LA Q UI NTA, EVACUATION CHANNEL
LA GUINTA RESORT CHANNEL
BEAR CREEK
COYOTE CREEK
10 SALTON
June 2014
783
2014 Whitewater River Region WQMP
Microtel
Appendix C
Supporting Detail Related to Hydrologic Conditions of Concern Not Applicable
2014 Whitewater River Region WQMP
Microtel
Appendix D
Educational Materials
TO BE INCLUDED IN FINAL WQMPs
785
2014 Whitewater River Region WQMP
Microtel
Appendix E
Soils Report
786
Project No. 23-0102-Inf
March 04, 2023
Sampson and Associates
CONSULTING ENGINEERS
Soil, Geology, Environmental
TO:
Mr. Farhad Zomorodi
9165 Alcott, #203
Los Angeles, Ca.
SUBJECT: Infiltration Evaluation, New Single -Family Residences On TTM No. 38636 In The City of Rancho Mirage, California.
INTRODUCTION:
We sincerely appreciate the opportunity to be of service to you on this project.
The primary objective of this study was to evaluate an infiltration rate of the onsite subsurface soils for the design of the infiltration drainage system to be constructed at designated area for the above subject site.
If you have any questions regarding this report please do not hesitate to contact this office at your convenience. We appreciate the opportunity to be of service on this project.
Respectfully__Su.bmitted; -------
Sam and Associates .---'
46172
Distribu
P. O. Box 834, San Dimas, California 91773 Tel.: (909) 522-7067 E -Mail: [email protected]
787
Project No. 23-0102-Inf
March 04, 2023
Rancho Mirage Terrace
co
0 Q 0-
0 I
o
o m
4 0
1 01
co
a
cr
o
ra
C
ured Care
0 W
0 Q
T
4 rD
Ginger Rogers Rd
Tolerance
Education Center
99 Siena Vista Court
,910 Siena Vista Ct
I—
r-
C
0 Via Montagne
Ginger Rogers Rd
4;0 Milligan Dermatology
Via Florencia
Via Florencia
Via Flort
Index Map
Of
❑❑M ❑ ❑ i mm
❑❑R ❑❑I ❑ M O❑❑❑❑❑ ❑
r
788
Project No. 23-0102-Inf
March 04, 2023
ACCOMPANYING MAPS & ILLUSTRATIONS,:
Index Map - Page 2
Plate 1 - Site Plan and Approximate Location of Infiltration Tests Appendix "A" - Field Test Logs
SITE LOCATION, PROPOSED DEVELOPMENT, and CONDITION:
The proposed development consists of (5) single-family residences with associated parking spaces located on north-east corner of Landy Lane and Ginger Rogers Road, ❑❑M ❑o❑❑❑❑❑ in the City of Rancho Mirage, California. Access to the site is available via improved Ginger Rodgers Road. The site is occupied with a small residence located on south side of the lot which is proposed to be completely demolished becoming part of new development.
The subject site is flat regular rectangular shape lot bounded by Ginger Rodgers Road on south, by Landy Lane on west, and by developed residential properties on east and north.
Project is covered with native weeds and large bushes. Drainage onsite is uncontrolled by sheet flow towards south.
SUBSURFACE INVESTIGATION:
To evaluate the subsurface condition of the subject sites, Five (5) exploratory Borings were drilled to maximum depths of (7) feet as shown on Plate -1. The excavations were then backfilled. The test Pits were logged and sampled. Bulk and relatively undisturbed samples were collected for proper laboratory testing.
SUBSURFACE CONDITIONS:
Soil materials encountered in our borings consisted loose fine sand deposit deposited by prevailing winds, sand and gravel of the valley area. The approximately 24 inches of loose to very loose and dry light greyish alluvial sand with fine silt and gravel of major creeks and stream washes material underlain by loose and dry light greyish sandy fine silt soils to dense and moist sandy silty soils within the depth of our borings.
GROUND WATER:
No ground water or any perched ground water was observed at our test locations onsite during the course of our investigation.
789
Project No. 23-0102-Inf
March 04, 2023
DOUBLE RING INFILTRATION TEST:
One (I) excavation was dug by hand, to a depth of about one (4) foot below existing grade at the approximate locations of the proposed infiltration drainage system of the site in the area identified by the project civil engineer as being the area to be used for infiltration purposes. Infiltration testing was completed using a double ring infiltrometer device into the ground, water was supplied with a constant falling head condition to a fixed point. A representative from our firm conducted the actual infiltration testing to record how much of water infiltrates into the soil over a given time period.
The incremental infiltration velocity within the inner test cylinder is equivalent to the infiltration rate (in/hr). The slowest/most conservative infiltration rate of ches per hour was measured for the test hole, after the infiltration rate had generally stabilized. The testing was completed in general conformance with ASTM D 3385.
FACTOR OF SAFETY:
The infiltration rates presented are based on field test results, the rates presented are measured field rates and should not be considered design infiltration rates. The designer should consider possible site variability in their design. Application of an appropriate safety factor may be required by the authorizing agency. The design engineer must use the factor of safety with the lowest average measured infiltration rate to achieve the design value as needed. The infiltration rate is approximately 4.5 in/hr.
RECOMMENDATIONS:
Bases on the result of the tests, the site is suitable for the storm -water infiltration system from a geotechnical viewpoint. Recommendations are provided as follows:
• Based on our testing water infiltration at the site is feasible. Filter fabric should be used whenever aggregate are placed against native soils. The infiltration rates are as follow:
Test # 1 Infiltration Rate @ 4 feet depth = 6.43 in/hr.
Test # 2 Infiltration Rate @ 4 feet depth = 6.26 in/hr.
Test # 3 Infiltration Rate @ 6 feet depth = 4.5 in/hr. ÷-USe This Rate • Infiltration water should not be allowed to saturate pavement and concrete structure sub - grade soils.
• The planned infiltration system should extend vertically into native soils. The designer should review the attached geotechnical Log for soils classification. • The soils in infiltration area should not be subject to compaction during construction. • The proposed system designed by Civil Engineer should be constructed and maintained in accordance with manufacture guidelines.
• Ti -filtration facilities must not be blocked by heavy equipment by using the infiltration area as a sediment trap.
790
Project No. 23-0102-Inf
March 04, 2023
• Infiltration facilities should be constructed late in the site development after soils has been stabilized or should be protected by flagging until work is completed. • A minimum distance of 10 feet in any directions shall be provided from the building foundation to the proposed stormwater infiltration system. • The potential for creating perched water conditions that may adversely affect the proposed and existing structures is nil due to the onsite permeable soils. • The subsurface soil will not exhibit instability as a result of implementing the proposed BMP's.
• There will be no geotechnical hazards posed to the proposed and existing structures on and adjacent to the site, if a minimum distance of 10 feet in any directions provided from the building foundations to the proposed stormwater infiltration system. • It must be noted that over the lifetime of the disposal area the infiltration rate may be affected by sediment build ups and biological activities as well as local variation in soils subsurface condition.
• Ferrous metal pipes should be protected from potential corrosion by bituminous coating, etc.
We recommend that all utility pipes be nonmetallic and/or corrosion resistance.
Recommendation should be verified by soluble sulfate and corrosion testing of soils samples obtained from specific locations during construction.
LIMITATONS:
Based on our visual observation it appears that the soils condition to be the same throughout the site however; soils material may vary in character between excavations and natural outcrops or conditions exposed during construction. Should soil conditions be encountered during construction that appear different this office must be notified immediately so that our recommendations may be re-evaluated.
791
Project No. 23-0102-Inf
March 04, 2023
APPENDIX "A"
C v
%TWO WORKING
/ DAYS BEFORE
YOU DIG
1-800-227-2600
A PUBLIC SERVICE BY
UNDERGROUND SERVICE ALERT
REV.
REVISION DESCRIPTION
ENGR.
CITY
DATE
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS
TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.
BENCHMARK:
CITY BM #PD 18-5
BEING A 1-1/2" COPPERWELD IN ASPHALT, FLUSH, AT THE
CENTERLINE INTERSECTION OF BOB HOPE DRIVE AND
DINAH SHORE DRIVE.
ELEV. = 347.672
CITY OF RANCHO MIRAGE, CALIFORNIA
DRAWN BY:
EB
DESIGNED BY:
EB
TENTATIVE TRACT MAP NO. 38636
72094 GINGER ROGERS ROAD
SCALE:
1"=20'
DATE: 12/5/2022
CHECKED BY:
SD
DRAWING NO.:
Project No. 23-0102-Inf
March 04, 2023
DOUBLE RING I NFJ LTRONIETER TEST DATA
Project Name and Test Location:
Constants-
Rine Jara
Liquid Containers
Rancho Mirage
lea_ -fir
(in`)
DT Eh of
Liquid (in`
No.
Vol.. V
(in3tin)
Inner Ring:
113
4 1
78.54 Test By: FDC FISTS Class:
SM
Annular Space:
339
4.1 2
176.7
Water Table Depth:
S0'
Penetration of Rings. into Soil (in.):
Inner:.
3 Inch
Outer
7 Inch
Date of Test: 3101/23 Liquid Used:
Water
pH:
7.3 I
round Temp (E):
61 at Depth.
4'
Liquid Level Maintained by using:
( ) Flow Valve ( ) Flout Valve ( ) Marriotte Tube ( ) Other:
Additional C arnments:
Depth Below Surface = 4'
Time
iate� a1
Time
�(hr:mit;
Eft
(� °�'
Total
Inner Ring
Annular Ring
Liquid
Tem Remark_
p
°F
Infiltration Rate, I
Elev., .,
H (In)
1H
(in) &
El..;-.:
H (!n)
Ail
(m) &
Inner
imhr
Outer
in.hr
1 - Start
7:15
5 2.00
2.25 1.00
3.25 57.00
18.77 20.22
End
7:20
5 4.25
176.72
4.25 574.28
57.00 _ S tart
7:20
10 4.25
4.00 4.25
5.50 57.00
16.68 17.20
End
7:30
15 8.25
314.16
9.75 971.85
57.00 3 - Start
7:30
15 8.25
3.75 9.75
5.25 57.00
10.43 19.95
End
7:45
30 12.0
294.53
15.00 927.68
57.00 4 - Starr-
7:45
30 1.0
7.0 1.00
5.50 58.00
73 5.73
Refilled Tube
End
8:15
60 8.0
549.76
6.50 971.85
60.00 7 - Start
8:15
30 1.0
6.0 6.50
8.00 60.00
8.34 8,34
Refilled Tube
End
9:15
90 7.00
471.24
14.50 1413.60
61.00 6 - Start
9:15
60 1.0
11.0 1.00
11.00 61.00
7.65 5.73
Refilled Tube
ad
10:15
150
12.00 863.94
12.00 1943.70
62.00 - Stan
10:15
60 0.50
10.50 1.00
11.00 62.--
7.30 5.73
Refilled Tube
End
11:15
180
11.0 824.67
12.00 1943.70
63.00 8 - Start
11:15
60 1.0
9.25 1.00
10.26 63.00
6.43 5.34
Refilled Tube
End
12:15
240
10.25 726.50
11.25 1811.1&
63.00 3 . Start
12:15
60 1.00
9.25 1.00
10.00 64.00
6.43 5.21
Refilled Tube
End
1:15
300
10.25 726.50
11.00 1767.00
64.00 ID _ Stan
1:15
60 1.00
9.25 1.00
10.00 64.00
6.43 5.21
Refilled Tube
End
2:15
360
10.25 726.50
11.0 1767.00
64.00 11 - Start
Use
4.5 In/hr
End
" - Start
End
-_ Start
End
:4 -Start
End
15 - Start
End
xFla , Qf= Ali xVt.
**Infiltration Rate. I = (Qf Ary.t
Table 3 — Sample Test Data Form for Double Ring Infiltrometer Test Riverside County - Low Impact Development BMP Design H 94 Handbo7
rev. 9/2011
B-Bbbbbbb 1
Project No. 23-0102-Inf
March 04, 2023
DOUBLE RING INFILTROMETER TEST DATA
Project Name & Test Lola f.1
Ring Data
Liquid Containers
Vr
(in3/in
)
Rancho Mirage
1 I'atQn Vol.,
Area, Ar
(in2)
Depth of
Liquid
(in)
No.
Inner Ring :
113
4 1
78.54 Test By:
FDC
USCS Class:
Annular Ring :
339
4.1 2
176.7
Water Table Depth:
50 ft.
Penetration of Rings into Soil (in.):
Inner:
3 in
Outter:
7 in
)ate of Test:
3/1/23
Liquid Use Water
iH:
7.5 Gound Temp (°F):
58 at Depth:
4'
Liquid Level Maintained by using:
( ) Flow Valve ( ) Float Valve ( X ) Marriotte Tube ( ) Other:
Additional Comments:
Depth Below Surface = 4'
Time Interval
Time
(hr:min)
At (min)
& Total
Inner Ring
Annular Ring
Liquid
p
°F
Infiltration Rate, I**
Remarks
Elev.,
Elev.,
H (in)
AH
(in) &
Elev.,
H (in)
AH (in)
&
inner
in/hr
Outer
in/hr
1 - Start
14:00
5 0.75
2.00 1.00
2.75 58.00
16.68 17.20
End
14:05
5 2.75
157.08
3.75 485.93
58.00 2
- Start
14:05
10 2.75
3.75 3.75
5.25 59.00
15.64 16.42
End
14:15
15 6.50
294.53
9.00 927.68
59.00 3
- Start
14:15
15 6.50
5.25 9.00
7.00 60.00
14.60 14.59
End
14:30
30 11.75
412.34
16.00 1236.90
60.00 4
- Start
14:30
30 2.00
9.00 1.50
12.25 60.00
12.51 12.77
Refilled Tubes
End
15:00
60 11.00
706.86
13.75 2164.58
60.00 5
- Start
15:00
30 1.00
8.75 2.00
12.25 60.00
12.16 12.77
Refilled Tubes
End
15:30
90 9.75
687.23
14.25 2164.58
61.00 6
- Start
15:30
30 0.50
8.00 1.50
11.75 61.00
11.12 12.25
Refilled Tubes
End
16:00
120
8.50 628.32
13.25 2076.23
62.00 7
- Start
16:00
30 8.50
6.50 1.00
10.00 62.00
9.04 10.42
End
16:30
150
15.00 510.51
11.00 1767.00
63.00 8
- Start
16:30
30 1.00
6.25 0.00
8.50 63.00
8.69 8'86
Refilled Tubes
End
16:30
180
7.25 490.88
8.50 1501.95
63.00 9
- Start
16:30
30 7.25
5.75 8.50
7.50 63.00
7.99 7.82
End
17:00
210
13.00 451.61
16.00 1325.25
64.00 10
- Start
17:00
30 1.00
4.75 1.00
6.75 64.00
6.60 7.04
Refilled Tubes
End
17:30
240
5.75 373.07
7.75 1192.73
64.00 11
- Start
17:30
30 5.75
4.50 7.75
6.25 65.00
6.26 6.52
End
18:00
270
10.25 353.43
14.00 1104.38
65.00 12
- Start
18:00
30 1.00
4.50 2.50
6.50 64.00
6.26 6.78
Refilled Tubes
End
18:30
300
5.50 353.43
9.00 1148.55
64.00 13
- Start
18:30
30 5.50
4.50 9.00
6.50 63.00
6.26 6.78
End
19:00
330
10.00 353.43
15.50 1148.55
63.00 14
- Start
Use 4
5 in/hr
End
15 - Start
End
795
Project No. 23-0102-Inf
March 04, 2023
INFILTRATION TESTING FIELD LOG
Boring/Excavation Percolation Testing Field Log
Project Location
Earth Description:
Tested by:
Liquid Description:
R -'- -I M rl-ll-lu
Silty Gravelly Fine Sand w/cobbles
TB/MS
Time Interval Standard:
Tap Water
Start Date for Pre -Soak: 3/01/2023
Start Time for Standard:
Measurement Method:
11:00
Date: 03/01/23
Boring/test Number: B-1
Diameter of Boring: 8 -inch
Depth of Boring: 4' below grade
Depth to Invert of BMP's: 4' ae ow grace
Depth to Water Table: >50'
Water Remaining In Boring (Y/N): Yes
Standard Time Interval
Between Readings:
Measuring Tape
Depth to initial water Depth(d1): 96"
30 Minutes
Reading
Number
Time
Start/End
(hh:mm)
Elapsed
Tjme
Time
(mins)
Water
Drop
During
Standard
Time
Interval
AD
(inches)
Percolation
Rate for
Reading
(in/hr)
Soil Description/Notes/Comments
11:00
1 30
5.75 11.50
Medium to Coarse, Silty Gravelly Fine
11:30
Sand
12:00
2 30
4.25 8.50
12:30
13:00
3 30
4.0 8.0
13:30
14:00
4 30
2.25 4.50
14:30
15:00
5 30
2.25 4.50
15:305
Infiltration
Rate
4.50 In/Hr.
Use 4.5 In/Hr.
796
2014 Whitewater River Region WQMP
Microtel
Appendix F
Structural BMP and/or Retention Facility Sizing Calculations and Design Details
Whitewater Watershed
Required Entries
Calculated Cells
BMP Design Volume, VBMP (Rev. 06-2014)
Legend:
Company Name SD Engineering ans Associates
Date
County/City Case No
TTM 38636
4/28/2023
Designed by Suresh
Company Project Number/Name
Drainage Area Number/Name DA 1
Enter the Area Tributary to this Feature (ATRIB)
ATRIB = 4.22 acres
Determine the Impervious Area Ratio
Determine the Impervious Area within ATRIB (AIMP) AIMP = Calculate Impervious Area Ratio (If) If=
If = AIMP/ATRIB
1.68 acres
0.40 Calculate the composite Runoff Coefficient, C for the BMP Tributary Area Use the following equation based on the WEF/ASCE Method CBMP = 0.858If3 - 0.78If2 + 0.774I f + 0.04 CBMP =
0.28 Determine Design Storage Volume, VBMP
Calculate Vu, the 80% Unit Storage Volume Vu= 0.40 X CBMP VU = Calculate the design storage volume of the BMP, VBMP.
VBMP (ft3)= Vu (in-ac/ac) x AT (ac) x 43,560 (ft2/ac) VBMP =
0.11 (in*ac)/ac
1,685 ft3
12 (in/ft)
Notes:
798
Infiltration
Basin - Design Procedure
(Rev. 03-2012)
BMP ID
Legend:
Recuired Entries
Calculated Cells
Company Name:
Designed by:
72094 Ginger Rogers Lane
County/City
Date: 4/28/2023
Case No.: Zancho Mirag
Design Volume
a) Tributary area (BMP subarea) AT =
b) Enter VBMP determined from Section 2.1 of this Handbook VBMP=
4.22 acres
1,685 ft3
Maximum Depth
a) Infiltration rate
(See Table 1, Appendix A: "Infiltration Testing"
Handbook)
D1 = I (in/hr) x 72 hrs
I =
FS =
D1 =
of basin)
D2 =
DMax =
4.5 in/hr
2 OVLS,5 ft
b) Factor of Safety
from this BMP
c) Calculate D1
d) Enter the depth
e) Enter depth to
f) Enter depth to
g) D2 is the smaller
Depth to groundwater
Depth to impermeable
h) DMax is the smaller
12 (in/ft) x FS
of freeboard (at least 1 ft)
historic high ground water (measured from top of basin) top of bedrock or impermeable layer (measured from top
of:
- (10 ft + freeboard) and
layer - (5 ft + freeboard)
value of D1 and D2 but shall not exceed 5 feet
1 ft
200 ft
70 ft
ft
13.5 ft
Basin Geometry
a) Basin side slopes (no steeper than 4:1) z =
b) Proposed basin depth (excluding freeboard) dB =
c) Minimum bottom surface area of basin (As= VBMP/dB) As = d) Proposed Design Surface Area AD =
4 :1
1.5 ft
I ft2
3441 ft2
Forebay
a) Forebay volume (minimum 0.5% VBMP) Volume =
b) Forebay depth (height of berm/splashwall. 1 foot min.) Depth = c) Forebay surface area (minimum) Area =
d) Full height notch -type weir Width (W) =
ft3
1 ft
8 ft2
12.0 in
Notes:
799
NOAA Atlas 14, Volume 6, Version 2
Location name: Rancho Mirage, California, USA*
Latitude: 33.7948°, Longitude: -116.4041°
Elevation: m/ft**
* source: ESRI Maps
** source: USGS
POINT PRECIPITATION FREQUENCY ESTIMATES
Sanja Perica, Sarah Dietz, Sarah Heim, Lillian Hiner, Kazungu Maitaria, Deborah Martin, Sandra Pavlovic, Ishani Roy, Carl Trypaluk, Dale Unruh, Fenglin Yan, Michael Yekta, Tan Zhao, Geoffrey Bonnin, Daniel Brewer, Li-Chuan Chen, Tye Parzybok, John Yarchoan NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials
PF tabular
PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration
5 -min
10 -min
15 -min
30 -min
60 -min
2 -hr
3 -hr
6 -hr
12 -hr
24 -hr
2 -day
3 -day
4 -day
7 -day
10 -day
20 -day
30 -day
45 -day
60 -day
Average recurrence interval (years)
1 0.061
(0.050-0.073)
0.087
(0.072-0.105)
0.105
(0.088-0.127)
0.164
(0.136-0.198)
0.239
(0.199-0.289)
0.340
(0.283-0.411)
0.409
(0.341-0.495)
0.557
(0.464-0.675)
0.667
(0.556-0.809)
0.779
(0.690-0.898)
0.862
(0.763-0.994)
0.903
(0.799-1.04)
0.930
(0.823-1.07)
0.992
(0.878-1.14)
1.04 (0.922-1.20)
1.13 (1.00-1.30)
1.26 (1.11-1.45)
1.37 (1.21-1.57)
1.49 (1.32-1.71)
2 0.094
(0.078-0.114)
0.134
(0.112-0.163)
0.163
(0.135-0.197)
0.253
(0.211-0.307)
0.370
(0.308-0.448)
0.515
(0.429-0.625)
0.616
(0.512-0.747)
0.837
(0.697-1.02)
1.02 (0.846-1.23)
1.21 (1.07-1.40)
1.35 (1.20-1.56)
1.42 (1.26-1.64)
1.47 (1.30-1.70)
1.58 (t40-1.83)
1.67 (1.48-1.93)
1.83 (1.61-2.11)
2.04 (1.80-2.35)
2.22 (1.96-2.56)
2.42 (2.14-2.79)
5 0.145
(0.120-0.176)
0.208
(0.172-0.253)
0.251
(0.208-0.305)
0.391
(0.325-0.476)
0.571
(0.474-0.694)
0.776
(0.644-0.945)
0.920
(0.764-1.12)
1.24 (1.03-1.51)
1.52 (1.26-1.85)
1.83 (1.62-2.12)
2.06 (1.82-2.39)
2.17 (1.92-2.52)
2.25 (1.99-2.61)
2.43 (2.15-2.82)
2.57 (2.27-2.98)
2.84 (2.50-3.28)
3.18 (2.80-3.68)
3.48 (3.07-4.03)
3.80 (3.35-4.39)
10 0.193
(0.159-0.236)
0.276
(0.227-0.339)
0.334
(0.275-0.410)
0.521
(0.428-0.639)
0.759
(0.625-0.932)
1.01 (0.836-1.25)
1.20 (0.984-1.47)
1.61 (1.32-1.97)
1.98 (1.63-2.42)
2.39 (2.09-2.79)
2.69 (2.35-3.14)
2.84 (2.48-3.31)
2.94 (2.57-3.43)
3.19 (2.79-3.72)
3.37 (2.95-3.93)
3.73 (3.26-4.35)
4.19 (3.67-4.89)
4.61 (4.04-5.38)
5.04 (4.41-5.88)
25 0.269
(0.214-0.342)
0.386
(0.307-0.490)
0.466
(0.371-0.592)
0.727
(0.578-0.923)
1.06 (0.844-1.35)
1.38 (1.10-1.76)
1.62 (1.29-2.05)
2.15 (1.71-2.73)
2.65 (2.11-3.37)
3.23 (2.74-3.89)
3.63 (3.08-4.37)
3.83 (3.24-4.61)
3.97 (3.36-4.78)
4.30 (3.64-5.18)
4.56 (3.86-5.49)
5.07 (4.29-6.10)
5.72 (4.84-6.88)
6.32 (5.36-7.61)
6.93 (5.87-8.34)
50 0.338
(0.263-0.438)
0.484
(0.377-0.628)
0.586
(0.456-0.760)
0.913
(0.711-1.18)
1.33 (1.04-1.73)
1.71 (1.33-2.21)
1.98 (1.54-2.56)
2.62 (2.04-3.39)
3.23 (2.52-4.19)
3.94 (3.27-4.85)
4.42 (3.67-5.44)
4.66 (3.87-5.73)
4.83 (4.01-5.94)
5.24 (4.35-6.43)
5.55 (4.61-6.82)
6.19 (5.14-7.60)
7.00 (5.81-8.60)
7.77 (6.45-9.55)
8.54 (7.09-10.5)
100
0.418
(0.318-0.556)
0.599
(0.455-0.797)
0.725
(0.551-0.964)
1.13 (0.858-1.50)
1.65 (1.25-2.19)
2.07 (1.57-2.75)
2.38 (1.81-3.17)
3.13 (2.38-4.16)
3.87 (2.94-5.15)
4.73 (3.84-5.96)
5.30 (4.30-6.66)
5.58 (4.52-7.02)
5.78 (4.69-7.27)
6.26 (5.07-7.87)
6.64 (5.38-8.35)
7.41 (6.01-9.33)
8.40 (6.81-10.6)
9.35 (7.59-11.8)
10.3 (8.36-13.0)
200
0.513
(0.379-0.702)
0.735
(0.543-1.01)
0.889
(0.656-1.22)
1.39 (1.02-1.90)
2.02 (1.49-2.77)
2.49 (1.84-3.40)
2.84 (2.10-3.89)
3.70 (2.73-5.07)
4.59 (3.39-6.28)
5.62 (4.44-7.27)
6.27 (4.95-8.11)
6.60 (5.21-8.53)
6.83 (5.39-8.83)
7.39 (5.83-9.55)
7.84 (6.19-10.1)
8.77 (6.92-11.3)
9.95 (7.85-12.9)
11.1 (8.77-14.4)
12.3 (9.67-15.8)
500
0.666
(0.471-0.951)
0.955
(0.676-1.36)
1.16 (0.817-1.65)
1.80 (1.27-2.57)
2.63 (1.86-3.75)
3.13 (2.21-4.47)
3.53 (2.50-5.04)
4.57 (3.23-6.52)
5.66 (4.00-8.08)
6.96 (5.28-9.36)
7.73 (5.86-10.4)
8.12 (6.15-10.9)
8.40 (6.37-11.3)
9.06 (6.87-12.2)
9.61 (7.29-12.9)
10.8 (8.16-14.5)
12.2 (9.27-16.5)
13.7 (10.4-18.4)
15.1 (11.5-20.4)
1000
0.841
(0.575-1.24)
1.21 (0.824-1.78)
1.46 (0.996-2.16)
2.27 (1.55-3.36)
3.32 (2.27-4.90)
3.71 (2.53-5.48)
4.14 (2.83-6.13)
5.30 (3.62-7.84)
6.58 (4.49-9.73)
8.11 (5.95-11.3)
8.97 (6.58-12.5)
9.41 (6.90-13.1)
9.72 (7.13-13.5)
10.5 (7.68-14.6)
11.1 (8.14-15.4)
12.4 (9.12-17.3)
14.1 (10.4-19.7)
15.8 (11.6-22.0)
17.6 (12.9-24.4)
1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).
Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.
Please refer to NOAA Atlas 14 document for more information. 800
Back to Top
PF graphical
PDS-based depth -duration -frequency (DDF) curves
Latitude: 33.7948", Lon g rtu d e: -116.4041°
Precipitation depth (in)
Precipitation depth (in)
18 _
16 14
12 10
8 6
4 -
2 0
C C
• C E E
u-i t u;
r -I r -I
18 16
14 12
10 8
6 4
Duration
E
i
r
r rd] u
I
N
-0o . v -0a -0 -0 v
r,!4 r6 4 A 6 6 6 IJ'S Q
2 5 10 25 50 100 200 500 1000
htOAA Atlas 14, Volume 6, Version 2
Average recurrence interval (years)
Created (GMT): Wed May 3 13:39:02 2023
Back to Top
Maps & aerials
Small scale terrain
Average recurrence
interval
(years),
1 2
5 10
25 50
100
200
500
1000
Duration
5 -mm
10 -min
15-rnrn
30 -mm
60- mm
2 -hr
3 -hr
6 -hr
12 -hr
24 -hr
2 -day
3 -day
4 -day
7 -day
10 -day
20 -day
30 -day
45 -day
60 -day
801
Large scale terrain
Lancaster
•
•
Palmdale
•
to
•
Victorville
]s Angeles Riverside #.
• �''rty,{.
Beach •Anaheim Cathedral c
• � ti
Santa Ana Palm Desert! Indio
Murrieta •
Oceanside''
100km 1 Diego
60mi
•
Lake H
Large scale map
inca&ter
..Palmcale etcrvilla
SantaClarita E
Los Angeles
Riversicle I
Anaheim Lathed
3eachc 'NO +'.Inclid
antaAna lain' Desert " -"` 4
'.hlurrieta
100km
f Lions'
60mi
La
H.:
gym: i
Yuma
MeisFcaFr—
Large scale aerial
802
Back to Top
US Department of Commerce
National Oceanic and Atmospheric Administration
National Weather Service
National Water Center
1325 East West Highway
Silver Spring, MD 20910
Questions?: [email protected]
Disclaimer
803
2014 Whitewater River Region WQMP
Microtel
Appendix G
AGREEMENTS — CC&Rs, COVENANT AND AGREEMENTS, BMP
MAINTENANCE AGREEMENTS AND/OR OTHER
MECHANISMS FOR ENSURING ONGOING OPERATION,
MAINTENANCE, FUNDING AND TRANSFER OF
REQUIREMENTS FOR THIS PROJECT -SPECIFIC WQMP
SEE FINAL WQMP SUBMITTAL
2014 Whitewater River Region WQMP
Microtel
Appendix H
PHASE 1 ENVIRONMENTAL SITE ASSESSMENT - SUMMARY OF SITE
REMEDIATION CONDUCTED AND USE RESTRICTIONS
NOT APPLICABLE
2014 Whitewater River Region WQMP
Microtel
Appendix I
PROJECT -SPECIFIC WQMP SUMMARY DATA FORM
806
Project -Specific WQMP Summary Data Form
Applicant Information
Name and Title
Farhad Zomoradi
Company
72094 Ginger Rogers LLC
Phone
310 428-2875
Email
Project Information
Project Name
(as shown on project application/project-specific WQMP) Tentative Tract Map 38636
Street Address
Northeast Corner Landy Lane and Ginger Rogers Road
Nearest Cross Streets
Victoria Drive
Municipality
(City or Unincorporated County)
Rancho Mirage
Zip Code
92770
Tract Number(s) and/or Assessor Parcel Number(s)
APN: 685-080-002
Other
(other information to help identify location of project) Indicate type of project.
Priority Development Projects (Use an "X" in cell preceding project type):
SF hillside residence; impervious area > 10,000 sq. ft.; Slope > 25% SF hillside residence; impervious area > 10,000 sq. ft.; Slope > 10% & erosive soils Commercial or Industrial > 100,000 sq. ft.
Automotive repair shop
Retail Gasoline Outlet disturbing> 5,000 sq. ft.
Restaurant disturbing > 5,000 sq. ft.
Home subdivision > 10 housing units
X
Parking lot ≥ 5,000 sq. ft. or > 25 parking spaces
Date Project -Specific WQMP Submitted
April 28, 2023
Size of Project Area (nearest 0.1 acre)
1.36 Will the project replace more than 50% of the impervious surfaces on an existing developed site?
No
Project Area managed with LID/Site Design BMPs
(nearest 0.1 acre)
4.2 Are Treatment Control BMPs required?
Yes
Is the project subject to onsite retention by ordinance or policy?
Yes
Did the project meet the 100% LID/Site Design
Measurable Goal?
Yes
Name of the entity that will implement, operate, and
maintain the post -construction BMPs
72094 Ginger Rogers LLC.
Contact Name
Farhad Zomoradi
Street or Mailing Address
P.O. Box 10544
City
Beverly Hills, Ca.
Zip Code
90213
Phone
909 519-3346
Space Below for Use by City/County Staff Only
Preceding Information Verified by
(consistent with information in project -specific WQMP) Name:
Date:
Date Project -Specific WQMP Approved:
Data Entered by
Name:
Date:
Other Comments
808
omrnrn -II= El PEo
p _
LEI FTTTIF
OE El EfElIMEIE
TTM 38636
NOISE IMPACT ANALYSIS
City of Rancho Mirage
October 20, 2023
Traffic Engineering • Transportation Planning • Parking • Noise & Vibration Air Quality • Global Climate Change • Health Risk Assessment
TTM 38636
NOISE IMPACT A N A LYS I S
City of Rancho virage
October 20, 2023
prepared by
Roma Stromberg, INCE, MS
Catherine Howe, MS
galdJiPi
GANDDINI GROUP INC.
555 Parkcenter Drive, Suite 225
Santa Ana, CA 92705
(714) 795-3100 I ganddini.com
Project No. 19669
810
TABLE OF CONTENTS
EXECUTIVE SUMMARY III
1. INTRODUCTION 1
Purpose and Objectives 1
Project Location 1
Project Description 1
2. NOISE AND VIBRATION FUNDAMENTALS 4
Noise Fundamentals 4
Vibration Fundamentals 4
3. EXISTING NOISE ENVIRONMENT 8
Existing Land Uses and Sensitive Receptors 8
4. REGULATORY SETTING 9
Federal Regulation 9
Federal Noise Control Act of 1972 9
State Regulations 9
California Code of Regulations 9
State of California General Plan Guidelines 2017 9
Department of Transportation 10
Local Regulations 10
City of Rancho Mirage General Plan 10
City of Rancho Mirage Municipal Code 11
5. ANALYTICAL METHODOLOGY AND MODEL PARAMETERS 18
Construction Noise Modeling 18
SoundPLAN Noise Model 18
Groundborne Vibration Modeling 18
6. NOISE AND VIBRATION IMPACTS 23
Noise Impacts 23
Project Construction Noise (On -Site Equipment) 23
Groundborne Vibration Impacts 24
Construction -Related Vibration Impacts 25
Air Traffic Impacts 25
7. REFERENCES 31
Appendices
Appendix A List of Acronyms
Appendix B Glossary
Appendix C Construction Noise Model Worksheets
Appendix D SoundPLAN Worksheets
Appendix E Groundborne Vibration Worksheets
g3ndJii
811
TTM 38636
Noise Impact Analysis
19669
List of Tables
Table 1. Guideline Vibration Damage Potential Threshold Criteria 13 Table 2. Guideline Vibration Annoyance Potential Criteria 14 Table 3. City of Rancho Mirage Noise Level and Land Use Compatibility 15 Table 4. City of Rancho Mirage Exterior Noise Level Standards (More than 30 Minutes) 16 Table 5. City of Rancho Mirage Adjustments For Exterior Noise Level Standards (30 Minutes and Less) 17
Table 6. CA/T Equipment Noise Emissions and Acoustical Usage Factor Database 20 Table 7. Construction Equipment Vibration Source Levels 22 Table 8. Construction Noise Levels (dBA Leq) 27
Table 9. Construction Vibration Levels at the Nearest Receptors 28 List of Figures
Figure 1. Project Location Map 2
Figure 2. Site Plan 3
Figure 3. A -Weighted Comparative Sound Levels 6
Figure 4. Typical Levels of Groundborne Vibration 7
Figure 5. Future Roadway Noise Levels 29
Figure 6. Future Roadway Noise Level Contours 30
g3ndJii
812
TTM 38636
Noise Impact Analysis
19669
EXECUTIVE SUMMARY
The 5.04 -acre project site is located at the northeast corner of the intersection of Landy Lane and Ginger Rogers Drive in the City of Rancho Mirage, California. The project site is currently vacant.
The proposed project involves development of a single-family residential subdivision consisting of nine (9) lots.
Existing Noise Environment
Sensitive receptors that may be affected by project generated noise include the existing single-family residential uses located adjacent to the north and east of the project site and approximately 566 feet to the southwest, 590 feet to the west, 1,340 feet to the south, and 1,296 feet to the southeast of the project site. Vehicle traffic associated with Bob Hope Drive is the dominant noise source and ambient noise levels on the project site are estimated to range between 51 and 54 dBA CNEL.
Project Construction Noise (On -Site Equipment)
The project site is adjacent to existing single family residential land uses to the north and to the east.
Construction, alteration, repair, grading or improvement of any building, structure, road, or improvement to real property for which a permit has been issued by the city if said construction occurs within the allowable hours set forth in Section 15.04.030 is exempt from the provisions of Section 8.45 of the City's Municipal Code. Therefore, as long as project construction occurs outside the hours of 7:00 PM to 7:00 AM or on Sundays or holidays, or if written permission of the Building Official is obtained, project construction will be consistent with the applicable ordinance. The project is expected to comply with this ordinance and therefore, will be consistent with applicable ordinances.
Existing noise levels and project construction noise levels were modeled at the northern and eastern property lines using the FTA methodology in order to determine the expected increase in noise levels due to project construction. Existing noise levels along the northern property line are estimated to average 52.5 dBA Leq and existing noise levels along the eastern property line are estimated to be 45.1 dBA Leq.
Construction noise levels are estimated to reach 61.6 dBA Leq at the nearest residential property to the north and 66.8 at the nearest residential property to the east. Increases in ambient noise levels due to project construction will reach up to 9.1 along the northern property line and reach up to 21.7 along the eastern property line.
Best management practices (BMPs) provided in the Project Description will be included on the project plans and in contract specifications to minimize construction noise emanating from the proposed project.
Project Construction Noise (Off -Site Traffic)
The addition of 15 worker trips per day will result in an increase of less than 1 dB. Therefore, vehicle traffic generated during project construction is nominal relative to existing roadway volumes. The project impact is less than significant; no mitigation is required.
Project Operational Noise (Project Generated Traffic Noise) Existing noise levels in the vicinity of the project site were modeled at 54.1 dBA CNEL and existing plus project generated vehicle traffic were modeled at 54.2 dBA CNEL, resulting in an increase of 0.1 dBA CNEL.
Project generated vehicle traffic would not result in substantial increases in ambient noise levels. The project impact is less than significant; no mitigation is required. g3ndJiPi
813
TTM 38636
Noise Impact Analysis
19669
Future Traffic Noise at the Project Site
future traffic noise levels at the project site are expected to reach 57.3 at proposed residential lots and will not exceed the City's criteria of normally acceptable (57.5 dBA CNEL). The proposed project would be consistent with the City General Plan Noise Element Noise Level and Land Use Compatibility Criteria. This impact would be less than significant. No mitigation is required.
Groundborne Vibration Impacts - Construction
With incorporation of BMPs, groundborne vibration generated by project construction would not exceed the levels necessary to cause architectural damage to sensitive receptors. Furthermore, potential annoyance at the nearest residential uses is expected to be temporary and only during daytime hours. This impact would be less than significant. No mitigation is required.
Air Traffic Impacts
The project site is located well outside the 60 dBA CNEL noise contour of Palm Springs International Airport. Therefore, the project would not expose people residing or working in the project area to excessive noise levels associated with airports. The impact would be less than significant; no mitigation is required. g3ndJii
814
TTM 38636
Noise Impact Analysis
19669
1. INTRODUCTION
This section describes the purpose of this study and the proposed project.
PURPOSE AND OBJECTIVES
The purpose of this report is to provide an assessment of the noise impacts resulting from development and operation of the proposed project and to identify mitigation measures that may be necessary to reduce potentially significant impacts. The noise issues related to the proposed land use and development have been evaluated in light of applicable federal, state, and local policies, including those of the City of Rancho Mirage, in the context of the California Environmental Quality Act (CEQA).
Although this is a technical report, effort has been made to write the report clearly and concisely. A list of acronyms and glossary are provided in Appendix A and Appendix B of this report to assist the reader with technical terms related to noise and vibration analysis.
PROJECT LOCATION
The 5.04 -acre project site is located at the northeast corner of the intersection of Landy Lane and Ginger Rogers Drive in the City of Rancho Mirage, California. The project site is currently vacant. A vicinity map showing the project location is provided on Figure 1.
PROJECT DESCRIPTION
The proposed project involves development of a single-family residential subdivision consisting of nine (9) lots. Figure 2 illustrates the project site plan.
The following best management practices (BMPs) shall be provided on project plans and in contract specifications to minimize construction and operational noise emanating from the proposed project:
1. All stationary construction equipment will be placed so that emitted noise is directed away from the noise sensitive receptors nearest the project site.
2. As applicable, all equipment shall be shut off when not in use.
3. To the degree possible, equipment staging will be located in acres that create the greatest distance between construction -related noise and vibration sources and existing sensitive receptors.
4. Jackhammers, pneumatic equipment, and all other portable stationary noise sources will be directed away and shielded from existing residences in the vicinity of the project site. Either one -inch plywood or sound blankets can be utilized for this purpose. They should reach up from the ground and block the line of sight between equipment and existing residences. The shielding should be without holes and cracks.
5. No amplified music and/or voice will be allowed on the project site.
6. Haul truck deliveries will not occur outside of the hours presented as exempt for construction per City of Rancho Mirage Municipal Code Section 15.04.030.
7. The use of vibratory rollers, or similar vibratory equipment, will be avoided within 20 feet of the residential structures to the north of the project site. gmdiri
815
TTM 38636
Noise Impact Analysis
19669
Figure 1
Project Location Map
816
TTM 38636
Noise Impact Analysis
19669
U
U.
_LANDSCAPING
P5 ' BSL
Co
2 5' BSL
PE=325.5
16,744 S. F.
0.28 ACRES
(V .!c.7 I LAND
y-325 =-4'4-
6 5 13'
Jl 126.50
PROPOSESH MASONRY WALL
25' BSL
126 .50'
0 .50%N 0 '11'34''E -509.23' 0.50%
LO A 25,248
8 F. (PRIV ATE STRE
o, XI T. 6' HIGH MA SOHY
z
0 0
0 A
Nr
0 v CC
0'
0'N LJ
'0 o 0'
25' BSL N
PE=32610
16,191 S .F.
0 .37 A RES
167.00'
J PRO •B 0 6' HIGH MASONRY WALL
PE=327 .
PE=326 .5 6
7 3 16,12 S .F.
16,186 S .F . 0.37 ACRES del
0.37 ACR
\1N_ NN
25. -B..L
32 ��
62 .61' 3807 \
Im .841 S
m
m 2 0 .3990
2.61,
16,299 S.F .
0.37 ACRES
6 ,184 S.F.
37 ACRES
3:6819 z iV1 ,F. 442/
a=FAMILY ''FiESANTIAL)
E7-2-97 .0
4 SEXIST. E° HIGH ASON4, WA
PE=328 .
l _
cd
OT
ifs
2. NOISE AND VIBRATION FUNDAMENTALS
This section provides an overview of key noise and vibration concepts.
NOISE FUNDAMENTALS
Sound is a pressure wave created by a moving or vibrating source that travels through an elastic medium such as air. Noise is defined as unwanted or objectionable sound. The effects of noise on people can include general annoyance, interference with speech communication, sleep disturbance, and in extreme circumstances, hearing impairment.
Commonly used noise terms are presented in Appendix B. The unit of measurement used to describe a noise level is the decibel (dB). The human ear is not equally sensitive to all frequencies within the sound spectrum. Therefore, the "A -weighted" noise scale, which weights the frequencies to which humans are sensitive, is used for measurements. Noise levels using A -weighted measurements are written dB(A) or dBA.
From the noise source to the receiver, noise changes both in level and frequency spectrum. The most obvious is the decrease in noise as the distance from the source increases. The manner in which noise reduces with distance depends on whether the source is a point or line source as well as ground absorption, atmospheric effects, and refraction, and shielding by natural and manmade features. Sound from point sources, such as air conditioning condensers, radiates uniformly outward as it travels away from the source in a spherical pattern. The noise drop-off rate associated with this geometric spreading is 6 dBA per each doubling of the distance (dBA/DD). Transportation noise sources such as roadways are typically analyzed as line sources, since at any given moment the receiver may be impacted by noise from multiple vehicles at various locations along the roadway. Because of the geometry of a line source, the noise drop-off rate associated with the geometric spreading of a line source is 3 dBA/DD.
Decibels are measured on a logarithmic scale, which quantifies sound intensity in a manner similar to the Richter scale used for earthquake magnitudes. Thus, a doubling of the energy of a noise source, such as a doubled traffic volume, would increase the noise levels by 3 dBA; halving of the energy would result in a 3 dBA decrease. Figure 3 shows the relationship of various noise levels to commonly experienced noise events.
Average noise levels over a period of minutes or hours are usually expressed as dBA Leg, or the equivalent noise level for that period of time. For example, Leq(3-hr) would represent a 3 -hour average. When no period is specified, a one -hour average is assumed.
Noise standards for land use compatibility are stated in terms of the Community Noise Equivalent Level (CNEL) and the Day -Night Average Noise Level (DNL). CNEL is a 24 -hour weighted average measure of community noise. CNEL is obtained by adding five decibels to sound levels in the evening (7:00 PM to 10:00 PM), and by adding ten decibels to sound levels at night (10:00 PM to 7:00 AM). This weighting accounts for the increased human sensitivity to noise during the evening and nighttime hours. DNL is a very similar 24 -hour average measure that weights only the nighttime hours.
It is widely accepted that the average healthy ear can barely perceive changes of 3 dBA; that a change of 5 dBA is readily perceptible, and that an increase (decrease) of 10 dBA sounds twice (half) as loud. This definition is recommended by the California Department of Transportation's Technical Noise Supplement to the Traffic Noise Analysis Protocol (2013).
VIBRATION FUNDAMENTALS
The way in which vibration is transmitted through the earth is called propagation. Propagation of earthborn vibrations is complicated and difficult to predict because of the endless variations in the soil through which 818
TTM 38636
Noise Impact Analysis
19669
waves travel. There are three main types of vibration propagation: surface, compression, and shear waves.
Surface waves, or Raleigh waves, travel along the ground's surface. These waves carry most of their energy along an expanding circular wave front, similar to ripples produced by throwing a rock into a pool of water.
Compression waves, or P -waves, are body waves that carry their energy along an expanding spherical wave front. The particle motion in these waves is longitudinal (i.e., in a "push-pull" fashion). P -waves are analogous to airborne sound waves. Shear waves, or S -waves, are also body waves that carry energy along an expanding spherical wave front. However, unlike P -waves, the particle motion is transverse or "side -to -side and perpendicular to the direction of propagation".
As vibration waves propagate from a source, the energy is spread over an ever-increasing area such that the energy level striking a given point is reduced with the distance from the energy source. This geometric spreading loss is inversely proportional to the square of the distance. Wave energy is also reduced with distance as a result of material damping in the form of internal friction, soil layering, and void spaces. The amount of attenuation provided by material damping varies with soil type and condition as well as the frequency of the wave.
Vibration amplitudes are usually expressed as either peak particle velocity (PPV) or the root mean square (RMS) velocity. The PPV is defined as the maximum instantaneous peak of the vibration signal in inches per second. The RMS of a signal is the average of the squared amplitude of the signal in vibration decibels (VdB), ref one micro -inch per second. The Federal Railroad Administration uses the abbreviation "VdB" for vibration decibels to reduce the potential for confusion with sound decibel.
PPV is appropriate for evaluating the potential of building damage and VdB is commonly used to evaluate human response. Decibel notation acts to compress the range of numbers required in measuring vibration.
Similar to the noise descriptors, Leg and Lmax can be used to describe the average vibration and the maximum vibration level observed during a single vibration measurement interval. Figure 4 illustrates common vibration sources and the human and structural responses to ground -borne vibration. As shown in the figure, the threshold of perception for human response is approximately 65 VdB; however, human response to vibration is not usually substantial unless the vibration exceeds 70 VdB. Vibration tolerance limits for sensitive instruments such as magnetic resonance imaging (MRI) or electron microscopes could be much lower than the human vibration perception threshold.
gmdiri
819
TTM 38636
Noise Impact Analysis
19669
SOUND
COMMON OUTDOOR LEVEL COMMON INDOOR
SOUND LEVELS dBA SOUND LEVELS
Jet Take Off (at 100 ft)
r^�
Firecrackers
�
rriT■•� Car Horn (at 3 ft)
Gas Lawn Mower (at 3 ft)
Diesel Truck (at 150 ft)
• 'w•�
MwW
Noisy Urban Area
Busy Highway (at 50 ft)
Commercial Area
Quiet Urban Area
—1400-.0
_al
—130-u
120
J
110 J
Rock Band (at 50 ft)
t�f
R
10o J Inside Subway Train (New York)
90 Food Blender (at 3 ft)
- 4o
Garbage Disposal (at 3 ft)
Shouting (at 3 ft)
Vacuum Cleaner (at 10 ft)
is
Normal Speech (at 3 ft) ••
Large Business Office
Dishwasher (in Adjacent Room)
•
Small Theater
Quiet Rural Area molpm Conference Room (Background) ►P
Imam Library
Bedroom (at Night)
Concert Hall (Background)
Recording Studio
minim
Threshold of Hearing
© Ganddini Group, Inc.
Based on Policy & Guidance from Federal Aviation Administration r.
Figure 3
A -Weighted Comparative Sound Levels
ga�lri
820
TTM 38636
Noise Impact Analysis
19669
Threshold, minor cosmetic damage
fragile buildings
Difficulty with tasks such as reading a — P.
video display sreen
Residential annoyance, frequent events
(e.g. commuter rail)
Residential annoyance, frequent
events (e.g. rapid transit)
Limit for vibration sensitive — D.
equipment. Approximate threshold
for human perception of vibration
Descriptor Conversion
PPV
dVB
MM/SEC
0.4000
100
10.160
0.1265
90 3.213
0.0400
80 1.016
0.0127
70 0.321
0.0040
60 0.102
0.0013
50 0.032
0.0004
40 0.010
100
90 80
70 60
50 40
Blasting from construction projects
4— Bulldozers and other heavy tracked
construction equipment
Commuter rail, upper range
4-- Rapid transit, upper range
1— Commuter rail, typical
4-- Bus or truck over bump
4-- Rapid transit, typical
4— Bus or truck, typical
1- Typical background vibration
•
Source: FRA, 2012. Federal Railroad Administration High -Speed Ground Transportation Noise and Vibration Impact Assessment. Office of Railroad Policy Development, Washington, D.C. DOT/FRA/ORD-12/15. September.
Figure 4
Typical Levels of Groundborne Vibration
ga�lri
821
TTM 38636
Noise Impact Analysis
19669
3. EXISTING NOISE ENVIRONMENT
This section describes the existing noise setting in the project vicinity.
EXISTING LAND USES AND SENSITIVE RECEPTORS
The project site is bordered by single-family residential uses to the north and east, Landy Lane to the west, and Giner Rogers Drive to the south of the project site.
The State of California defines sensitive receptors as those land uses that require serenity or are otherwise adversely affected by noise events or conditions. Schools, libraries, churches, hospitals, single and multiple - family residential, including transient lodging, motels and hotel uses make up the majority of these areas.
Sensitive land uses that may be affected by project noise include the existing single-family residential uses located adjacent to the north and east of the project site and approximately 566 feet to the southwest, 590 feet to the west, 1,340 feet to the south, and 1,296 feet to the southeast of the project site.
Bob Hope Drive parallels the site approximately 400 feet to the west in a north/south direction. It is designated as a six -lane divided Major Arterial with a 120 -foot right-of-way. Vehicle traffic traveling on Bob Hope Drive dominates the existing noise environment at the project site and is expected to continue to be the dominant noise source in the future. Existing noise levels at the site associated with vehicles traveling on Bob Hope Drive was modeled using a level of service buildout capacity of 20,806 average daily trips (ADT),1 a vehicle mix of 92 % automobiles, 3% medium trucks, and 5 percent heavy trucks, and a speed of 40 miles per hour.2 The modeling sheets are provided in Appendix D. The existing modeled noise level at the project site is 54.1 dBA CNEL.
1 City of Rancho Mirage Street Traffic Counts. https://ranchomirageca.gov/our-city/city-departments/public-works/street-traffic- counts/. Accessed Oct. 19, 2023.
2 Riverside County Public Health Requirements for Determining and Mitigating Traffic Noise Impacts to Residential Structures. Jan. 15, 2004
gmdiri
822
TTM 38636
Noise Impact Analysis
19669
4. REGULATORY SETTING
FEDERAL REGULATION
Federal Noise Control Act of 1972
The U.S. Environmental Protection Agency (EPA) Office of Noise Abatement and Control was originally established to coordinate federal noise control activities. After its inception, EPA's Office of Noise Abatement and Control issued the Federal Noise Control Act of 1972, establishing programs and guidelines to identify and address the effects of noise on public health, welfare, and the environment. In response, the EPA published Information on Levels of Environmental Noise Requisite to Protect Public Health and Welfare with an Adequate Margin of Safety (Levels of Environmental Noise). The Levels of Environmental Noise recommended that the Ldn should not exceed 55 dBA outdoors or 45 dBA indoors to prevent significant activity interference and annoyance in noise -sensitive areas.
In 1981, EPA administrators determined that subjective issues such as noise would be better addressed at lower levels of government. Consequently, in 1982 responsibilities for regulating noise control policies were transferred to State and local governments. However, noise control guidelines and regulations contained in EPA rulings in prior years remain in place by designated Federal agencies, allowing more individualized control for specific issues by designated Federal, State, and local government agencies.
STATE REGULATIONS
California Code of Regulations
The State of California's noise insulation standards are codified in the California Code of Regulations, Title 24, Building Standards Administrative Code, Part 2, and the California Building Code. These noise standards are applied to new construction in California for the purpose of controlling interior noise levels resulting from exterior noise sources. The regulations specify that acoustical studies must be prepared when noise - sensitive structures, including residential buildings, are developed near major transportation noise sources, and where such noise sources create an exterior noise level of 60 dB CNEL or higher. Acoustical studies that accompany building plans for noise -sensitive land uses must demonstrate that the structure has been designed to limit interior noise in habitable rooms to acceptable noise levels. For new residential buildings the acceptable interior noise limit for new construction is 45 dB CNEL State of California General Plan Guidelines 2017
Though not adopted by law, the State of California General Plan Guidelines 2017, published by the California Governor's Office of Planning and Research (OPR) (OPR Guidelines), provides guidance for the compatibility of projects within areas of specific noise exposure. The OPR Guidelines identify the suitability of various types of construction relative to a range of outdoor noise levels and provide each local community some flexibility in setting local noise standards that allow for the variability in community preferences. Findings presented in the Levels of Environmental Noise Document (EPA 1974) influenced the recommendations of the OPR Guidelines, most importantly in the choice of noise exposure metrics (i.e., Ldn or CNEL) and in the upper limits for the normally acceptable outdoor exposure of noise -sensitive uses.
The OPR Guidelines include a Noise and Land Use Compatibility Matrix which identifies acceptable and unacceptable community noise exposure limits for various land use categories. Where the "normally acceptable" range is used, it is defined as the highest noise level that should be considered for the construction of the buildings which do not incorporate any special acoustical treatment or noise mitigation.
The "conditionally acceptable" or "normally unacceptable" ranges include conditions calling for detailed acoustical study prior to the construction or operation of the proposed project. gmdiri
823
TTM 38636
Noise Impact Analysis
19669
Department of Transportation
The California Department of Transportation (Caltrans) has developed several publications on groundborne vibration. The Transportation and Construction Vibration Guidance Manual (Caltrans, 2020) provides informational content that supplements previous publications with improved knowledge and information relating to groundborne transportation- and construction -induced vibrations. Although the Transportation and Construction Vibration Guidance Manual is not an official policy, standard, specification, or regulation, it serves as a useful guide for evaluating vibration impacts.
Table 1 and Table 2 show the guideline criteria for potential damage and annoyance resulting from groundborne vibration. As shown in Table 1, these guidelines recommend that the threshold at which there is a risk of architectural damage is a peak particle velocity (PPV) of 0.25 inches/second (in/sec) for historic buildings, PPV of 0.3 in/sec at older residential structures, and a PPV of 0.5 in/sec at new residential structures and modern commercial/industrial buildings. Table 2 shows that a PPV of 0.4 in/sec is the threshold at which groundborne vibration becomes severe in regard to annoyance (Caltrans, 2020).
LOCAL REGULATIONS
City of Rancho Mirage General Plan
The City of Rancho Mirage General Plan Noise Element provides goals, policies and programs that are intended to ensure compatible development, protect noise sensitive land uses, and minimize the effects of excessive and nuisance noise. As shown in Table 3, per the City of Rancho Mirage General Plan, noise levels of up to 57.5 dBA CNEL are considered "normally acceptable" and up to 70 dBA CNEL are considered "conditionally acceptable" for single-family residential uses. These thresholds apply to the project itself.
Goals, policies, and programs from the Noise Element of the City's General Plan that are applicable to the proposed project are presented below:
Goal N 1
Policies:
N 1.1
A noise environment providing peace and quiet that complements and is consistent with Rancho Mirage's resort residential character.
Land use patterns, associated traffic and its distribution, and individual developments shall be assessed for their potential to generate adverse and incompatible noise impacts. Noise exceeding normally acceptable levels shall be appropriately mitigated.
Program N 1.1A
Program N 1.1B
Expand the City's Noise Ordinance to include noise exposure thresholds triggering project -specific noise impact studies. Provide development standards and project design guidelines that include a variety of mitigation measures that can be applied to meet City standards.
Develop and utilize an outline of minimal requirements for noise studies for future development projects. Studies shall analyze project impacts and the effectiveness of proposed mitigation measures.
N 1.2 Noise sensitive land uses, including residences, resorts, community open space, schools, libraries, churches, hospitals, and convalescent homes, shall be protected from high noise levels emitted by both existing and future noise sources.
Program N 1.2A On a project -specific basis, apply noise mitigating site planning and require the installation of sound walls, earthen berms, wall, and gmdiri
824
TTM 38636
Noise Impact Analysis
19669
window noise insulation, and/or other mitigation measures in areas exceeding the City's normally acceptable noise limits.
N 1.3 Project designs shall be required to include measures that assure that interior noise levels for residential development do not exceed 45 dBA CNEL.
Program N 1.3A
In areas subject to exterior noise levels exceeding 65 dBA CNEL, the City shall require new residential development, upon construction, to demonstrate compliance with all applicable noise level limits at project completion.
N 1.4 Land uses allowed adjacent to Rancho Mirage's major arterial roads and highways, or the Southern Pacific Railroad/I-10 corridor, should generally be limited to those that are compatible with higher noise levels to maximize noise -related land use compatibility.
N 1.5 Develop and maintain a circulation plan that is consistent with the resort residential character of Rancho Mirage, avoids impacts to existing and planned sensitive receptors/uses, and provides fixed routes for existing and future truck traffic.
Program N 1.5A
City of Rancho Mirage Municipal Code
Employ noise mitigation practices, as necessary, when designing future streets and highways, and when improvements occur along existing road segments. Mitigation measures should emphasize the establishment of natural buffers or setbacks between the arterial roadways and adjoining noise -sensitive areas.
The City's Municipal Code sets forth standards, guidelines, and procedures concerning the regulation of noise in Rancho Mirage. Section 8.45 cites the value and importance given by residents, visitors, and businesses to the exceptional quality of life and peace and quiet of the community. Portions applicable to the proposed project are presented below.
8.45.030 Exterior noise level limits.
Section 8.45.030 defines exterior noise level standards for the emission of noise from one property to another based on the zoning and time -of -day.
The noise level limits, presented in Table 4, are for a cumulative period of thirty minutes during any hour of the applicable time period. For cumulative periods of time less than thirty minutes in an hour, all the noise standards in Table 4 are increased according to Table 5. Per the ordinance, if the measured ambient noise level exceeds the dBA limits in Table 4, the noise limits and their adjustments for the first three categories in Table 5 shall be increased in five dBA increments as needed to encompass or reflect said ambient noise level. The maximum noise level under the last two categories in Table 4 shall be increased, if necessary, only to equal the ambient noise level.
8.45.050 Special provisions and exemptions.
The following activities and noise sources shall be exempted from the provisions of Section 8.45 of the City's Municipal Code.
E. Construction, alteration, repair, grading or improvement of any building, structure, road, or improvement to real property for which a permit has been issued by the city if said construction occurs within the allowable hours set forth in Section 15.04.030. gmdiri
825
TTM 38636
Noise Impact Analysis
19669
F. The operation of any equipment and machinery at any time within any zone by the city, its employees, or any agent or franchisee of the city in the course of performing maintenance, construction, or trash collection.
Section 15.04.030 Adoption, modifications, amendments, and deletions to Chapter 1 of the Building Code. 117.1 Restricted hours; Construction work. Except as otherwise provided herein, no person other than the person actually occupying any buildings to be altered, repaired or improved, shall be engaged or employed, nor shall any person cause any other person to be engaged or employed in any work of construction, erection, alteration, repair, addition to or improvement of any building, structure, road or improvement to realty, between the hours of 7:00 PM of each day and 7:00 AM of the next succeeding day or on Sundays and holidays, without written permission of the Building Official being first obtained. The Building Official may grant permission to work during those periods under appropriate circumstances after first having determined that such work will not unduly or unreasonably interfere with the peaceful enjoyment of property adjacent to such work.
117.2 Restricted hours; Landscape maintenance. Within gated communities, shopping centers, commercial centers, vacant residential or commercial parcels, or developed residential or commercial parcels, landscape activities such as leaf blowing, tree trimming, re -seeding, or mowing of grass as associated with the re- seeding process and any other landscaping activities which generate unusual noise, are prohibited between the hours of 6:00 PM of each day and 7:00 AM of the next succeeding day or on Sundays or on holidays.
8.45.065 Landscape maintenance.
A. It is unlawful and a public nuisance for any person to permit or perform for -hire landscape and non - emergency exterior hardscape maintenance activities such as, but not limited to, tree trimming, re- seeding, lawn mowing, leaf blowing, dust and debris clearing and any other landscaping or nonemergency exterior hardscape maintenance activities which utilize any motorized saw, sander, drill, grinder, leaf -blower, lawnmower, hedge trimmer, edger, or any other similar tool or device any time on Saturday and Sunday and between the hours of 6:00 PM and 7:00 AM the next day during weekdays, unless otherwise provided in this section.
17.18.080 Vibration.
No vibration associated with any use shall be allowed which is discernible beyond the boundary line of the subject property.
gmdiri
826
TTM 38636
Noise Impact Analysis
19669
Table 1
Guideline Vibration Damage Potential Threshold Criteria Structure Condition
Maximum PPV (in/sec)
Transient Sources'
Intermittent Sources'
Extremely fragile historic buildings, ruins, ancient monuments
0.12 0.08
Fragile buildings
0.2 0.1
Historic and some old buildings
0.5 0.25
Older residential structures
0.5 0.3
New residential structures
1.0 0.5
Modern industrial/commercial buildings
2.0 0.5
Source: California Department of Transportation. Transportation and Construction Vibration Guidance Manual, Chapter 7 Table 19, April 2020.
Notes:
(1) Transient sources create a single isolated vibration event, such as blasting or drop balls. Continuous/frequent intermittent sources include impact pile drivers, pogo -stick compactors, crack -and -seat equipment, vibratory pile drivers, and vibratory compaction equipment. gn±Iii
827
TTM 38636
Noise Impact Analysis
19669
Table 2
Guideline Vibration Annoyance Potential Criteria
Human Response
Maximum PPV (in/sec)
Transient Sources
Continuous/ -requen:
Intermittent Sources
Barely perceptible
0.04 0.01
Distinctly perceptible
0.25 0.04
Strongly perceptible
0.9 0.10
Severe
2.0 0.4
Source: California Department of Transportation. Transportation and Construction Vibration Guidance Manual, Notes:
(1) Transient sources create a single isolated vibration event, such as blasting or drop balls. Continuous/frequent intermittent sources include impact pile drivers, pogo -stick compactors, crack -and -seat equipment, vibratory pile drivers, and vibratory compaction equipment.
g31dJH
828
TTM 38636
Noise Impact Analysis
19669
Table 3
City of Rancho Mirage Noise Level and Land Use Compatibility Land Use
Community Noise Exposure dBA CNEL or L,J,
55 60 65 70 75 80
Residential - low density
(single-family dwellings, duplex, mobile homes)
Residential - multi -family
Transient Lodging - motels, hotels
Schools, Libraries, Churches,
Hospitals, Nursing Homes
Auditoriums, Concert Halls. Amphitheaters
Sports Arenas. Outdoor Spectator Sports
Playgrounds, Neighborhood Parks
Golf Courses, Riding Stables,
Water Recreation. Cemeteries
Office Buildings, Business,
Commercial and Professional
Industrial, Manufacturing,
Utilities. Agriculture
Normally Acceptable: Specified land use is satisfactory, based upon the assumption that any buildings are conventionally constructed with no special noise installation requirements.
Conditionally New construction or development should be undertaken only after a detailed analysis of the noise Acceptable: reduction requirements is made and needed noise insulation features included in the design.
Conventional construction, but with dosed windows and fresh air supply systems or air conditioning will normally suffice. Outdoor environment will seem noisy.
Normally New construction or development should generally be discouraged, but if it does proceed, a detailed Unacceptable: analysis of the noise reduction requirements must be made with needed noise insulation features included in the design and outdoor areas must be shielded.
Clearly Unacceptable:
New construction or development should generally not be undertaken. Construction cost to make indoor environment acceptable would be prohibitive and outdoor environment would not be usable.
Source: City of Rancho Mirage 2017 General Plan.
829
M 38636
Noise Impact Analysis
19669
Table 4
City of Rancho Mirage Exterior Noise Level Standards (More than 30 Minutes) Land Use/Zone
Time of Day
Noise Level (dBA)
Residential, Low Density (R -E, H -R, R -L-2,
RL3)
7:00 AM to 6:00 PM
55 6:00 PM to 10:00 PM
50 10:00 PM to 7:00 AM
45 Residential, Medium and High Density,
Hospital, Open Space (OS, R -M, R -H,
MHP)
7:00 AM to 6:00 PM
60 6:00 PM to 10:00 PM
55 10:00 PM to 7:00 AM
50 Commercial Office, Resort Commercial,
Mixed Use, Institutional (O, P, Rs -H, M -U)
7:00 AM to 6:00 PM
65 6:00 PM to 10:00 PM
60 10:00 PM to 7:00 AM
55 Commercial Neighborhood, General
Commercial, Commercial Recreation,
Light Industrial (C N, C G, I -L)
7:00 AM to 6:00 PM
70 6:00 PM to 10:00 PM
65 10:00 PM to 7:00 AM
60 Notes:
Source: City of Rancho Mirage Municipal Code 8.45.030 (Table A-1). 830
TTM 38636
Noise Impact Analysis
19669
Table 5
City of Rancho Mirage Adjustments
For Exterior Noise Level Standards (30 Minutes and Less) Duration of Sound
dBA Adjustment
15-30 minutes per hour
3 10-15 minutes per hour
5 5-10 minutes per hour
10 1-5 minutes per hour
15 Any period of time less than 1 minute per
hour
20 Notes:
Source: City of Rancho Mirage Municipal Code 8.45.030 (Table B-1). 831
TTM 38636
Noise Impact Analysis
19669
5. ANALYTICAL METHODOLOGY AND MODEL PARAMETERS
This section discusses the analysis methodologies used to assess noise impacts.
CONSTRUCTION NOISE MODELING
Construction noise will vary depending on the construction process, type of equipment involved, location of the construction site with respect to sensitive receptors, the schedule proposed to carry out each task (e.g., hours and days of the week) and the duration of the construction work.
Construction noise associated with the proposed project was calculated at the sensitive receptor locations, utilizing methodology presented in the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual (2018) together with several key construction parameters, including: distance to each sensitive receiver, equipment usage, percent usage factor, and baseline parameters for the project site.
Distances to receptors were based on the acoustical center of the project site.
The equipment used to calculate the construction noise levels for each phase were based on the assumptions provided in the California Emissions Estimator Model (CaIEEMod) modeling provided in the Air Quality, Global Climate Change, and Energy Impact Analysis prepared for the proposed project (Ganddini Group, Inc., 2023). For analysis purposes, the distance measured from the project site to sensitive receptors was assumed to be the acoustical center of the project site to the property line of residential properties with existing residential buildings. Sound emission levels associated with typical construction equipment as well as typical usage factors are provided in Table 6. Construction noise worksheets are provided in Appendix C.
SOUNDPLAN NOISE MODEL
The SoundPLAN acoustical modeling software was utilized to model existing, existing plus project, and future roadway noise levels at the proposed sensitive receptors (e.g., residences). SoundPLAN is capable of evaluating both mobile and stationary noise sources (e.g., vehicle traffic, rail, parking lots,, drive-thru menus, car wash equipment, vacuums, etc.). The SoundPLAN software utilizes algorithms (based on the inverse square law) to calculate noise level projections. The software allows the user to input specific noise sources, spectral content, sound barriers, building placement, topography, and sensitive receptor locations.
Landy Lane borders the project site to the west and Ginger Rogers Road borders the project site to the south. Both of these roadways are designated as two-lane "Local" roadways with 60 -foot rights -of -way in the City of Rancho Mirage 2017 General Plan Circulation Element. Neither of these roadways will generate enough vehicle traffic to be considered acoustically significant. Bob Hope Drive parallels the site approximately 400 feet to the west in a north/south direction. It is designated as a six -lane divided Major Arterial with a 120 -foot right-of-way. Vehicle traffic traveling on Bob Hope Drive dominates the existing noise environment at the project site and is expected to continue to be the dominant noise source in the future. Bob Hope Drive was modeled using a level of service buildout capacity of 43,100 average daily trips (ADT), a vehicle mix of 92 % automobiles, 3% medium trucks, and 5 percent heavy trucks, and a speed of 40 miles per hour3. The modeling sheets are provided in Appendix D.
GROUNDBORNE VIBRATION MODELING
Groundborne vibration modeling was performed using vibration propagation equations and construction equipment source levels obtained from the FTA Transit Noise and Vibration Impact Assessment Manual (2018).
Table 7 shows typical vibration levels associated with commonly used construction equipment based on data from the FTA.
3 Riverside County Public Health Requirements for Determining and Mitigating Traffic Noise Impacts to Residential Structures. Jan. 15, 2004
832
TTM 38636
Noise Impact Analysis
19669
There are several types of construction equipment that can cause vibration levels high enough to annoy persons in the vicinity and/or result in architectural or structural damage to nearby structures and improvements. For example, as shown in Table 7, a vibratory roller could generate up to 0.21 in/sec PPV at and operation of a large bulldozer could generate up to 0.089 PPV at a distance of 25 feet (two of the most vibratory pieces of construction equipment). Groundborne vibration at sensitive receptors associated with this equipment would drop off as the equipment moves away. For example, as the vibratory roller moves further than 100 feet from the sensitive receptors, the vibration associated with it would drop below
0.0026 in/sec PPV. It should be noted that these vibration levels are reference levels and may vary slightly depending upon soil type and specific usage of each piece of equipment.
The fundamental equation used to calculate vibration propagation through average soil conditions and distance is as follows:
PPVequipment = PPVref (25/Drec)n
Where: PPVref = reference PPV at 25ft.
Drec = distance from equipment to receiver in ft.
n =1.5 (the value related to the attenuation rate through ground) Groundborne vibration calculations are provided in Appendix E. gmdiri
833
TTM 38636
Noise Impact Analysis
19669
Table 6 (1 of 2)
CA/T Equipment Noise Emissions and Acoustical Usage Factor Database Equipment Description
Impact
Device?
Acoustical
Use Factor (%)
Spec. Lmax
@ 50ft
(dBA, slow)
Actual
Measured
Lmax @ 50ft
(dBA, slow)
No. of Actual
Data Samples
(Count)
All Other Equipment > 5 HP
No
50 85
-N/A-
0 Auger Drill Rig
No
20 85
84 36
Backhoe
No
40 80
78 372
Bar Bender
No
20 80
-N/A-
0 Blasting
Yes
-N/A-
94 -N/A-
0 Boring Jack Power Unit
No
50 80
83 1
Chain Saw
No
20 85
84 46
Clam Shovel (dropping)
Yes
20 93
87 4
Compactor (ground)
No
20 80
83 57
Compressor (air)
No
40 80
78 18
Concrete Batch Plant
No
15 83
-N/A-
0 Concrete Mixer Truck
No
40 85
79 40
Concrete Pump Truck
No
20 82
81 30
Concrete Saw
No
20 90
90 55
Crane
No
16 85
81 405
Dozer
No
40 85
82 55
Drill Rig Truck
No
20 84
79 22
Drum Mixer
No
50 80
80 1
Dump Truck
No
40 84
76 31
Excavator
No
40 85
81 170
Flat Bed Truck
No
40 84
74 4
Forklift2.3
No
50 n/a
61 n/a
Front End Loader
No
40 80
79 96
Generator
No
50 82
81 19
Generator (<25KVA, VMS signs)
No
50 70
73 74
Gradall
No
40 85
83 70
Grader
No
40 85
-N/A-
0 Grapple (on backhoe)
No
40 85
87 1
Horizontal Boring Hydr. Jack
No
25 80
82 6
Hydra Break Ram
Yes
10 90
-N/A-
0 Impact Pile Driver
Yes
20 95
101
11 Jackhammer
Yes
20 85
89 133
Man Lift
No
20 85
75 23
Mounted Impact hammer (hoe ram)
Yes
20 90
90 212
Pavement Scarifier
No
20 85
90 2
Paver
No
50 85
77 9
Pickup Truck
No
50 85
77 9
Paving Equipment
No
50 85
77 9
Pneumatic Tools
No
50 85
85 90
g31dJiri
834
TTM 38636
Noise Impact Analysis
19669
Table 6 (2 of 2)
CA/T Equipment Noise Emissions and Acoustical Usage Factor Database Equipment Description
Impact
Devi __
Acoustical
Use Factor (%)
Spec. Lmax
@ 50ft
(dBA, slow)
Actual
Measured
Lmax @ 50ft
(dBA, slow)
No. of Actual
Data Samples
(Count)
Pumps
No
50 77
81 17
Refrigerator Unit
No
100
82 73
3 Rivit Buster/chipping gun
Yes
20 85
79 19
Rock Drill
No
20 85
81 3
Roller
No
20 85
80 16
Sand Blasting (Single Nozzle)
No
20 85
96 9
Scraper
No
40 85
84 12
Shears (on backhoe)
No
40 85
96 5
Slurry Plant
No
100
78 78
1 Slurry Trenching Machine
No
50 82
80 75
Soil Mix Drill Rig
No
50 80
-N/A-
0 Tractor
No
40 84
-N/A-
0 Vacuum Excavator (Vac -truck)
No
40 85
85 149
Vacuum Street Sweeper
No
10 80
82 19
Ventilation Fan
No
100
85 79
13 Vibrating Hopper
No
50 85
87 1
Vibratory Concrete Mixer
No
20 80
80 1
Vibratory Pile Driver
No
20 95
101
44 Warning Horn
No
5 85
83 12
Welder/Torch
No
40 73
74 5
Notes:
(1) Source: FHWA Roadway Construction Noise Model User's Guide January 2006. (2) Warehouse & Forklift Noise Exposure - NoiseTesting.info Carl Stautins, November 4, 2014 http://www.noisetesting.info/blog/carl-strautins/page-3/ (3) Data provided Leq as measured at the operator. Sound Level at 50 feet is calculated using Inverse Square Law. g31dJii
835
TTM 38636
Noise Impact Analysis
19669
Table 7
Construction Equipment Vibration Source Levels
Equipment
PPV at 25 ft, in/sec
Approximate Lv* at 25 ft
Pile Driver (impact)
upper range
1.518
112
typical
0.644
104
Pile Driver (sonic)
upper range
0.734
105
typical
0.170
93 clam shovel drop (slurry wall)
0.202
94 Hydromill (slurry wall)
in soil
0.008
66 in rock
0.017
75 Vibratory Roller
0.210
94 Hoe Ram
0.089
87 Large Bulldozer
0.089
87 Caisson Drilling
0.089
87 Loaded Trucks
0.076
86 Jackhammer
0.035
79 Small Bulldozer
0.003
58 Source: Federal Transit Administration: Transit Noise and Vibration Impact Assessment Manual, 2018. *RMS velocity in decibels, VdB re 1 micro-in/sec
g31dJii
836
TTM 38636
Noise Impact Analysis
19669
6. NOISE AND VIBRATION IMPACTS
This section analyzes the significance of project -related noise and groundborne vibration impacts relative to standards established by the City of Rancho Mirage and other applicable agencies in the context of CEQA.
Appendix G of the California Environmental Quality Act Guidelines (Title 14, Division 6, Chapter 3 of the California Code of Regulations) includes an environmental checklist that identifies issues upon which findings of significance should be made. The CEQA Environmental Checklist Appendix G, XIII. Noise, requires determination if the project would result in:
a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
b) Generation of excessive groundborne vibration orgroundborne noise levels? c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the area to excessive noise levels?
NOISE IMPACTS
Would the project result in:
a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
Finding: Less Than Significant
In relation to the Environmental Checklist noise issue "a", applicable standards established by the City of Rancho Mirage can be categorized into the following areas:
• Construction Noise
• Mobile Source Noise
Project Construction Noise (On -Site Equipment)
The project site is adjacent to existing single family residential land uses to the north and to the east.
Construction, alteration, repair, grading or improvement of any building, structure, road, or improvement to real property for which a permit has been issued by the city if said construction occurs within the allowable hours set forth in Section 15.04.030 is exempt from the provisions of Section 8.45 of the City's Municipal Code. Therefore, as long as project construction occurs outside the hours of 7:00 PM to 7:00 AM or on Sundays or holidays, or if written permission of the Building Official is obtained, project construction will be consistent with the applicable ordinance. The project is expected to comply with this ordinance and therefore, will be consistent with applicable ordinances.
Existing noise levels and project construction noise levels were modeled at the northern and eastern property lines using the FTA methodology in order to determine the expected increase in noise levels due to project construction. Existing noise levels along the northern property line are estimated to average 52.5 dBA Leq and existing noise levels along the eastern property line are estimated to be 45.1 dBA Leq.
Construction noise levels are estimated to reach 61.6 dBA Leq at the nearest residential property to the north and 66.8 at the nearest residential property to the east. Increases in ambient noise levels due to project construction will reach up to 9.1 along the northern property line and reach up to 21.7 along the gmdiri
837
TTM 38636
Noise Impact Analysis
19669
eastern property line. Construction noise modeling worksheets for each phase are provided in Appendix C.
Anticipated noise levels during each construction phase are presented in Table 8.
Best management practices (BM Ps) provided in the Project Description will be included on the project plans and in contract specifications to minimize construction noise emanating from the proposed project.
Project Construction Noise (Off -Site Traffic)
Construction truck trips would occur throughout the construction period. Given the project site's proximity to Interstate 10 Freeway, it is anticipated that vendor and/or haul truck traffic would take the most direct route to the appropriate freeway ramps.
According to the TTM 38636 Air Quality, Global Climate Change, and Energy Impact Analysis (Ganddini Group, Inc., 2023), the greatest number of construction -related vehicle trips per day would be during grading and paving at up to 15 vehicle trips per day (for worker trips). The addition of 15 trips will result in an increase of less than 1 dB. Therefore, vehicle traffic generated during project construction is nominal relative to existing roadway volumes. The project impact is less than significant; no mitigation is required.
Project Operational Noise (Project Generated Traffic Noise) The proposed project is the development of the approximately 4.37 net -acre project site with 9 single- family residential lots. Due to the project's size, it is anticipated that it will screen out and will not require a traffic study. Therefore, based on the Institute of Transportation Engineers (ITE) 11th Edition Trip Generation Manual (2021) rate for single-family housing (ITE 210), the proposed project will have trip generation rates of 9.43 trips per dwelling unit per weekday, 9.48 trips per dwelling unit per Saturday, and
8.48 trips per dwelling unit per Sunday. Considering these trip generation rates and that the project is only 9 dwelling units, the proposed project would be anticipated to generate up to approximately 85 vehicle trips per day.
As discussed in Section 3, existing noise levels at the project site were modeled at 54.1 dBA CNEL. Existing plus project generated vehicle traffic were modeled at 54.2 dBA CNEL and would result in an increase of
0.1 dBA CNEL over existing noise levels. Project generated vehicle traffic would not result in substantial increases in ambient noise levels. The project impact is less than significant; no mitigation is required.
Future Traffic Noise at the Project Site
As shown in Table 3, per the City of Rancho Mirage General Plan, noise levels of up to 57.5 dBA CNEL are considered "normally acceptable" and up to 70 dBA CNEL are considered "conditionally acceptable" for single-family residential uses. Per the City, new construction or development should be undertaken only after a detailed analysis of the noise reduction requirements is made and needed noise insulation features included in the design. Conventional construction, but with closed windows and fresh air supply systems or air conditioning will normally suffice. Noise levels at the western property line As shown in Figure 5 and in Figure 6, future traffic noise levels at the project site are expected to reach
57.3 at proposed residential lots and will not exceed the City's criteria of normally acceptable (57.5 dBA CNEL). The proposed project would be consistent with the City's General Plan Noise Element Noise Level and Land Use Compatibility Criteria (Table 3).
GROUNDBORNE VIBRATION IMPACTS
Would the project result in:
b) Generation of excessive groundborne vibration or groundborne noise levels? gmdiri
838
TTM 38636
Noise Impact Analysis
19669
Finding: Less Than Significant
In relation to the Environmental Checklist noise issue "b", the City of Rancho Mirage Municipal Code Section
17.18.080 states that no vibration associated with any use shall be allowed which is discernible beyond the boundary line of the subject property. However, the City has not established thresholds of significance concerning groundborne vibration. In the absence of City -established thresholds, groundborne vibration impacts are based on guidance from the Transportation and Construction Vibration Guidance Manual (California Department of Transportation, 2020) (see Regulatory Setting section). Accordingly, the project would result in a significant impact if:
• Groundborne vibration levels generated by the project have the potential to cause architectural damage at nearby buildings by exceeding the following PPV:
• 0.08 in/sec at extremely fragile historic buildings, ruins, ancient monuments • 0.10 in/sec at fragile buildings
• 0.25 in/sec at historic and some old buildings
• 0.30 in/sec at older residential structures
• 0.50 in/sec at new residential structures and modern industrial/commercial buildings. • Groundborne vibration levels generated by the project have the potential to cause severe annoyance to people living or working in nearby buildings by exceeding a PPV of 0.4 in/sec.
Groundborne vibration modeling worksheets are provided in Appendix E.
Construction -Related Vibration Impacts
Existing structures in the immediate vicinity of the project site include the single-family residential dwelling units located as close as approximately 15 feet to the north and 26 feet to the east of the project site and the commercial building located as close as approximately 195 feet to the southwest of the project site.
Groundborne vibration levels associated with project construction are provided in Table 9. As shown in Table 9, the residential threshold of 0.3 PPV in/sec will be exceeded at the residential uses to the north.
BMPs prohibiting the use of vibratory rollers, or other similar vibratory equipment, within 20 feet of residential structures to the north will reduce potential architectural damage impacts. With incorporation of the needed best management practice for architectural damage, potential annoyance at the nearest residential uses would be below the 0.4 in/sec PPV threshold. Furthermore, annoyance is expected to be temporary, occurring during the daytime hours and only when vibratory equipment, such as vibratory rollers, are in proximity to a residential structure. Project construction would not result in the exposure of persons to excessive groundborne vibration and impacts would be less than significant with incorporation of BMPs management practices listed in the Project Description.
The most substantial sources of groundborne vibration during post -construction project operations will include the movement of passenger vehicles and trucks on paved and generally smooth surfaces. Loaded trucks generally have a PPV of 0.076 at a distance of 25 feet (Caltrans 2020), which is a substantially lower PPV than that of a vibratory roller (0.210 in/sec PPV at 25 feet). Therefore, groundborne vibration levels generated by project operation would not exceed those modeled for project construction.
AIR TRAFFIC IMPACTS
Would the project result in:
c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the area to excessive noise levels? gmdiri
839
TTM 38636
Noise Impact Analysis
19669
Finding: No Impact
The closest airport to the project site is the Palm Springs International Airport, with associated airport runways located as close as approximately 5.55 miles northwest of the project site. As shown on Map PS -3, Noise Compatibility Contours, of the Riverside County Airport Land Use Compatibility Plan Policy Document (adopted March 2005) the project site is located well outside the 60 dBA CNEL noise contour of Palm Springs Airport. Therefore, the proposed project would not expose people residing or working in the area to excessive noise levels. There is no impact, and no mitigation is required. gmdiri
840
TTM 38636
Noise Impact Analysis
19669
Table 8
Construction Noise Levels (dBA Leq)
Receptor Location
Representative
Noise
Measurement'
Existing Ambient
Noise Levels
(dBA Leq)
Construction
Noise Levels
(dBA Leq)2
Increase Due to
Construction
Phase: Demolition
Residential Adjacent on the North
NM1
52.5 60.5
8.0 Residential Adjacent on the East
NM2
45.1 65.7
20.6 Phase: Grading
Residential Adjacent on the North
NM1
52.5 61.6
9.1 Residential Adjacent on the East
NM2
45.1 66.8
21.7 Phase: Building Construction
Residential Adjacent on the North
NM1
52.5 58.0
5.5 Residential Adjacent on the East
NM2
45.1 63.2
18.1 Phase: Paving
Residential Adjacent on the North
NM1
52.5 58.4
5.9 Residential Adjacent on the East
NM2
45.1 63.5
18.3 Phase: Architectural Coating
Residential Adjacent on the North
NM1
52.5 48.8
0.0 Residential Adjacent on the East
NM2
45.1 53.9
8.8 Notes:
(1) Estimated per existing traffic noise levels associated with Bob Hope Drive (see Appendix *) (2) Construction noise worksheets are provided in Appendix D. 841
TTM 38636
Noise Impact Analysis
19669
Table 9
Construction Vibration Levels at the Nearest Receptors
Receptor Location
Distance
from
Property
Line to
Nearest
Structure
(feet)
Equipment
Vibration
Level'
Threshold
Exceeded?2
Vibration
Level with
BMPs?
Threshold
Exceeded?
Architectural Damage Analysis in (PPV)
Residential to North (9 Siena Vista Court, Rancho Mirage) 15 Vibratory Roller
0.452
Yes
0.293
No
15 Large Bulldozer
0.191
No
-
-
Residential to East (7 Echo Lane, Rancho Mirage)
26 Vibratory Roller
0.198
No
-
-
26 Large Bulldozer
0.084
No
-
Commercial to Southwest (Resuscitation International (Surgical Supply Store), 35100 Bob Hope Drive #200)
195
Vibratory Roller
0.010
No
-
-
195
Large Bulldozer
0.004
No
-
-
Notes:
(1) Vibration levels are provided in PPV in/sec.
(2) Caltrans identifies the threshold at which there is a risk to "architectural" damage older residential structures as 0.3 in/sec PPV and 0.5 in/sec PPV at modern industrial/commercial buildings (see Table 2).
(3) Needed Best Management Practices (BMPs) for architectural damage would include prohibiting the use of vibratory rollers, or other similar vibratory equipment, within 20 feet of residential strucures to the north of the project site. gmd±i
842
TTM 38636
Noise Impact Analysis
19669
CD)
t • .,c .•°ipla Asa►
4-464914
YAS
j
. .
W
ti
•
•
S. .
4 • •
•• •.4.-.
.� `
. ir
I
It ie 4:
• •
I
•
•
57.3 •
f
a1 3 •
• . , • • woe, •
•
•
c•• •a,
•
1► ••
-
• • { 0
•
•
•
•
•
•
♦ •
•
Signs and symbols
PropertyBoundary
Proposed 6 -Ft Masonry Wall
Receiver
Bob Hope Drive
Figure 5
Future Traffic Noise Levels (dBA, CNEL)
843
TTM 38636
Noise Impact Analysis
19669
1 Signs and symbols
Property Boundary
Proposed 6 -Ft Masonry Wall
Bob Hope Drive
Levels in dB(A) CNEL
45 45 - 50
50 - 55
55 - 60
60 - 65
65 - 70
>= 70
Figure 6
Future Traffic Noise Contours (dBA, CNEL)
844
TTM 38636
Noise Impact Analysis
19669
7. REFERENCES
California Department of Transportation
2002 Transportation Related Earthborne Vibrations (California Department of Transportation Experiences), Technical Advisory, Vibration TAV-02-01-89601. February 20. 2020 Transportation and Construction Vibration Guidance Manual. April.
Environmental Protection Agency
1974 "Information on Levels of Environmental Noise Requisite to Protect Public Health And Welfare with an Adequate Margin of Safety," EPA/0NAC 550/9-74-004, March 1974.
Federal Transit Administration
2006 Transit Noise and Vibration Impact Assessment. Typical Construction Equipment Vibration Emissions. FTAVA-90-1003-06.
2018 Transit Noise and Vibration Impact Assessment Manual. Typical Construction Equipment Vibration Emissions.
Harris, Cyril M.
1991 Handbook of Acoustical Measurement and Noise Control. Acoustical Society of America.
Woodbury, N.Y.
Rancho Mirage, City of
2017 City Rancho Mirage General Plan 2017 Update. November. 2023 Municipal Code. March.
Office of Planning and Research
2017 State of California General Plan Guidelines
Riverside, County of
2001 General Plan, Chapter 4, Figure C-3 "Link Volume Capacities/Level of Service for Riverside County Roadways".
2009 County of Riverside Industrial Hygiene Guidelines for Determining and Mitigating Traffic Noise Impacts to Residential Structures and County.
Stautins, Carl
2014 Warehouse & Forklift Noise Exposure - NoiseTesting.info Carl Stautins, November 4. http://www.noisetesting.info/blog/carl-strautins/page-3/ U.S. Department of Transportation
2006 FHWA Roadway Construction Noise Model User's Guide. January. gmdiri
845
TTM 38636
Noise Impact Analysis
19669
APPENDICES
Appendix A List of Acronyms
Appendix B Glossary
Appendix C Construction Noise Model Worksheets
Appendix D SoundPLAN Worksheets
Appendix E Groundborne Vibration Worksheets
gmdiri
8Ap -1�
TTM 38636
Noise Impact Analysis
19669
APPENDIX A
LIST OF ACRONYMS
8A47
Term
Definition
ADT
Average Daily Traffic
ANSI
American National Standard Institute
CEQA
California Environmental Quality Act
CNEL
Community Noise Equivalent Level
D/E/N
Day / Evening / Night
dB
Decibel
dBA or dB(A)
Decibel "A -Weighted"
dBA/DD
Decibel per Double Distance
dBA Leq
Average Noise Level over a Period of Time
EPA
Environmental Protection Agency
FHWA
Federal Highway Administration
Lo2,Los,Lso,L90
A -weighted Noise Levels at 2 percent, 8 percent, 50 percent, and 90 percent, respectively, of the time period
DNL
Day -Night Average Noise Level
Leq(x)
Equivalent Noise Level for "x" period of time
Leq
Equivalent Noise Level
Lmax
Maximum Level of Noise (measured using a sound level meter) Lm in
Minimum Level of Noise (measured using a sound level meter) LOS C
Level of Service C
OPR
California Governor's Office of Planning and Research
PPV
Peak Particle Velocities
RCNM
Road Construction Noise Model
REMEL
Reference Energy Mean Emission Level
RMS
Root Mean Square
8,448
APPENDIX B
GLOSSARY
849
Term
Definition
Ambient Noise
Level
The all -encompassing noise environment associated with a given environment, at a specified time, usually a composite of sound from many sources, at many directions, near and far, in which usually no particular sound is dominant.
A Weighted Sound
Level, dBA
The sound level obtained by use of A -weighting. The A -weighting filter de-emphasizes the very low and very high frequency components of the sound in a manner similar to the frequency response of the human ear.
CNEL
Community Noise Equivalent Level. CNEL is a weighted 24 -hour noise level that is obtained by adding five decibels to sound levels in the evening (7:00 PM to 10:00 PM), and by adding ten decibels to sound levels at night (10:00 PM to 7:00 AM). This weighting accounts for the increased human sensitivity to noise during the evening and nighttime hours.
Decibel, dB
A logarithmic unit of noise level measurement that relates the energy of a noise source to that of a constant reference level; the number of decibels is 10 times the logarithm (to the base 10) of this ratio.
DNL, Ldn
Day Night Level. The DNL, or Ldn is a weighted 24 -hour noise level that is obtained by adding ten decibels to sound levels at night (10:00 PM to 7:00 AM). This weighting accounts for the increased human sensitivity to noise during the nighttime hours.
Equivalent
Continuous Noise
Level, Leg
A level of steady state sound that in a stated time period, and a stated location, has the same A -weighted sound energy as the time -varying sound.
Fast/Slow Meter
Response
The fast and slow meter responses are different settings on a sound level meter. The fast response setting takes a measurement every 100 milliseconds, while a slow setting takes one every second.
Frequency, Hertz
In a function periodic in time, the number of times that the quantity repeats itself in one second (i.e., the number of cycles per second).
Lot, L08, Lso, L90
The A -weighted noise levels that are equaled or exceeded by a fluctuating sound level, 2 percent, 8 percent, 50 percent, and 90 percent of a stated time period, respectively.
Lmax, Lmin
Lmax is the RMS (root mean squared) maximum level of a noise source or environment measured on a sound level meter, during a designated time interval, using fast meter response. Lmin is the minimum level.
Offensive/
Offending/Intrusive
Noise
The noise that intrudes over and above the existing ambient noise at a given location.
The relative intrusiveness of sound depends on its amplitude, duration, frequency, and time of occurrence, and tonal information content as well as the prevailing ambient noise level.
Root Mean Square
(RMS)
A measure of the magnitude of a varying noise source quantity. The name derives from the calculation of the square root of the mean of the squares of the values. It can be calculated from either a series of lone values or a continuous varying function. 8550
APPENDIX C
CONSTRUCTION NOISE MODEL WORKSHEETS
8561
Receptor - Residential Uses to North
Construction Phase Equipment Item
# of Items
Item Lmax at 50 feet, dBA'
Distance to Receptors
Item Usage Percent
Usage Factor
Dist. Correction dB
Usage Adj. dB
Receptor Item Lmax, dBA
Receptor Item Leq, dBA
With 6 Ft Wall Reduction
Demolition
Concrete/Industrial Saws
1 82
290
40 0.40
-15.3
-4.0
66.7 62.8
52.8 Excavators
3 82
290
40 1,20
-15.3
0.8 66.7
67.5 57.5
Rubber Tired Dozers
2 82
290
40 0.80
-15.3
-1.0
66.7 65.8
55.8 Log Sum
70.5 60.5
Grading
Excavators
1 82
290
40 0.40
-15.3
-4.0
66.7 62.8
52.8 Rubber Tired Dozers
1 82
290
40 0.40
-15.3
-4.0
66.7 62.8
52.8 Tractors/Loaders/Backhoes
3 84
290
40 1.20
-15.3
0.8 68.7
69.5 59.5
Graders
1 85
290
40 0.40
-15.3
-4.0
69.7 65.8
55.8 Log Sum
71.6 61.6
Building Construction
Cranes
1 81
290
16 0.16
-15.3
-8.0
65.7 57.8
47.8 Forklifts'
3 48
290
40 1.20
-15.3
0.8 32.7
33.5 23.5
Generator Sets
1 81
290
50 0.50
-15.3
-3.0
65.7 62.7
52.7 Welders
3 74
290
40 L20
-15.3
0.8 58.7
59.5 49.5
Tractors/Loaders/Backhoes
1 84
290
40 0.40
-15.3
-4.0
68.7 64.8
54.8 Log Sum
68.0 58.0
Paving
Concrete Mixer
2 80
290
20 0.40
-15.3
-4.0
64.7 60.8
50.8 Pavers
1 77
290
50 0.50
-15.3
-3.0
61.7 58.7
48.7 Paving Equipment
2 77
290
50 1.00
-15.3
0.0 61.7
61.7 51.7
Rollers
2 80
290
20 0.40
-15.3
-4.0
64.7 60.8
50.8 Tractors/Loaders/Backhoes
1 84
290
40 0.40
-15.3
-4.0
68.7 64.8
54.8 Log Sum
68.4 58.4
Architectural Coating
Air Compressors 1 78 290 40 0.40 1 -15.3
-4.0
62.7 58.8
48.8 Log Sum
58.8 48.8
Notes
(1) Source: Referenced nose levels from the Federal Transit Administration (FTA) Transit N Ise and Vibration Impact Assessment Manual (September 2018) and the FHWA Roadway Canstructlon Noise Model User's. Guide (January 2006) (2) Source: SoundPLAN reference list.
(3) Distance to receptor calculated from center of site Construction noise projected from the center of the project site to nearest sensitive use (property rne). 852
Receptor - Residential Uses to East
Construction Phase Equipment Item
# of Items
Item Lmax at 50 feet, dBA'
Distance to Receptor'
Item Usage Percent
Usage Factor
Dist. Correction dB
Usage Adj. dB
Receptor Item Lmax, dBA
Receptor Item Leq, dBA
With 6 Ft Wall Reduction
Demolition
Concrete/Industrial Saws
1 82
16Q
40 0.40
-10.1
-4.0
71.9 67.9
57.9 Excavators
3 82
16Q
40 1,20
-10.1
0.8 71.9
72.7 62.7
Rubber Tired Dozers
2 82
16Q
40 0.80
-10.1
-1.0
71.9 70.9
60.9 Log Sum
75.7 65.7
Grading
Excavators
1 82
160
40 0.40
-10.1
-4.0
71.9 67.9
57.9 Rubber Tired Dozers
1 82
160
40 0.40
-10.1
-4.0
71.9 67.9
57.9 Tractors/Loaders/Backhoes
3 84
160
40 1.20
-10.1
0.8 73.9
74.7 64.7
Graders
1 85
160
40 0.40
-10.1
-4.0
74.9 70.9
60.9 Log Sum
76.8 66.8
Building Construction
Cranes
1 81
160
16 0.16
-10.1
-8.0
70.9 62.9
52.9 Forklifts
3 48
160
40 1.20
-10.1
0.8 37.9
38.7 28.7
Generator Sets
1 81
160
50 0.50
-10.1
-3.0
70.9 67.9
57.9 Welders
3 74
160
40 L20
-10.1
0.8 63.9
64.7 54.7
Tractors/Loaders/Backhoes
1 84
160
40 0.40
-10.1
-4.0
73.9 69.9
59.9 Log Sum
73.2 63.2
Paving
Concrete Mixer
2 80
160
20 0.40
-10.1
-4.0
69.9 65.9
55.9 Pavers
1 77
160
50 0.50
-10.1
-3.0
66.9 63.9
53.9 Paving Equipment
2 77
160
50 1.00
-10.1
0.0 66.9
66.9 56.9
Rollers
2 80
160
20 0.40
-10.1
-4.0
69.9 65.9
55.9 Tractors/Loaders/Backhoes
1 84
160
40 0.40
-10.1
-4.0
73.9 69.9
59.9 Log Sum
73.5 63.5
Architectural Coating
Air Compressors 1 78 160 40 0.40 1 -10.1
-4.0
67.9 63.9
53.9 Log Sum
63.9 53.9
Notes
(1) Source: Referenced nose levels from the Federal Transit Administration (FTA) Transit N Ise and Vibration Impact Assessment Manual (September 2018) and the FHWA Roadway Canstructlon Noise Model User's. Guide (January 2006) (2) Source: SoundPLAN reference list.
(3) Distance to receptor calculated from center of site Construction noise projected from the center of the project site to nearest sensitive use (property rne). 8$3
APPENDIX D
SOUNDPLAN WORKSHEETS
854
Existing Traffic - SoundPlan
-: s.0:1 "TNM 2.5"
Traffic Speeds, surface
Entry type
Veh/h manually (3)
One-way traffic In entry direction
Veh/h(d) p(dX%) Veh/h(e) p(e)(%) Veh/h(n) p(n)[%]
1271.6 905.8
Automobiles
Medium trucks
Heavy trucks
Buses
Motorcycles
Auxiliary vehicle
Levels
[d8(A)I
314.4
Veh/h(d) p(d)[%1 Veh/h(e) p(e)(%) Veh/h(n) p(n)[%]
1205.0 894.7
221.9
25.0 2.0 4.2 0.5 34.7 11.0
41.6 3.3 6.9 0.8 57.8 18.4
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
ADT [Veh/24h] 20806
d(7.19h) e(19 -22h) n(22 -7h)
65.06 59.17 65.84
855
Receiver list
No.
Receiver name
Building
side
Floor
Limit
Lden
dB(A)
Level
Lden
dB(A)
Conflict
Lden
dB
1 1
EG
54.1 P -11`�
GANDDINI GROUP, INC. 550 Parkcenter Drive, Suite 202 Santa Ana CA 92705 USA
Existing Plus Project Traffic - SoundPlan
Emission 'TNM 2.5" X
Traffic Speeds, surface
Entry type
Veh/h manually (3)
One-way traffic In entry direction ADT [Veh/24h] 20880
Veh/h(d) p(d1[') Veh/h(e) p(e)(i] Veh/h(n) p(n)[Z]
1275.9 - 909.5 - 315.6
Automobiles
Medium trucks
Heavy trucks
Buses
Motorcycles
.Auxiliary vehicle
Veh/h(d)
1209.0
25.1 41.8
0.0 0.0
p(drJ
2.0 3.3
0.0 0.0
Veh/h(e)
898.3
4.2 7.0
0.0 0.0
p(e)(%) Veh/h(n) p(n)[Z]
222.8
0.5 34.8 11.0
0.8 58.0 18.4
0.0 0.0 0.0
0.0 0.0 0.0
Levels
[d8(All
d(7 -19h) e(19.22h) n(22 -7h)
65.08 59.21 65.86
$,57
Receiver list
No.
Receiver name
Building
side
Floor
Limit
Lden
dB(A)
Level
Lden
dB(A)
Conflict
Lden
dB
1 1
EG
54.2 P -13'�
GANDDINI GROUP, INC. 550 Parkcenter Drive, Suite 202 Santa Ana CA 92705 USA
Future Traffic - SoundPlan
Emission "INNS 2.5` X
Traffic Speeds, surface
Entry type Veh/h manually (3)
One-way traffic
In entry direction ADT (Veh/24h] 43099
Veh/h(d) p(d)]%] Veh/h(e) p(e)R] Veh/h(n) p(n)[%)
2634.1 - 1876.3 - 651.2
Automobiles
Medium trucks
Heavy trucks
Buses
Motorcycles
Auxiliary vehicle
Levels
MA)]
Veh/h(d) p(d)[%] Veh/h(e) p(e)[%] Veh/h(n) p(n)[%]
2496.2 - 1853.3 - 459.7
51.7 2.0 8.6 0.5 71.8 11.0
86.2 3.3 14.4 0.8 119.7 18.4
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
1r'�ot
lal.
d(7.1 9h) e(19 -22h) n(22.7h)
68.22 62.34 69.00
859
Receiver list
No.
Receiver name
Building
side
Floor
Limit
Day Evenin Night Lden
dB(A)
Level
Day Evenin Night Lden
dB(A)
50.1 43.8 51.0 57.3
Conflict
Day Evenin Night Lden
dB
1 1
EG
P -1
GANDDINI GROUP, INC. 550 Parkcenter Drive, Suite 202 Santa Ana CA 92705 USA
APPENDIX E
GROUNDBORNE VIBRATION WORKSHEETS
GROUNDBORNE VIBRATION ANALYSIS
Project: 19669 TTM 38636 Date: 10/4/23
Source: Vibratory Roller
Scenario: Unmitigated
Location: Residential to North
Address: 9 Siena Vista Court, Rancho Mirage
PPV = PPVref(25/D)^n (in/sec)
INPUT
Equipment -
Type
PPVref =
D =
n =
Vibratory Roller INPUT SECTION IN GREEN
Reference PPV (in/sec) at 25 ft.
Distance from Equipment to Receiver (ft)
Vibration attenuation rate through the ground
0.21 .6
1.50 Note: Based on reference equations from Vibration Guidance Manual, California Department of Transportation, 2006, pgs 38-43,
RESULTS
PPV =
0.452
IN/SEC OUTPUT IN BLUE
862
GROUNDBORNE VIBRATION ANALYSIS
Project: 19669 TTM 38636 Date: 10/4/23
Source: Large Bulldozer
Scenario: Unmitigated
Location: Residential to North
Address: 9 Siena Vista Court, Rancho Mirage
PPV = PPVref(25/D)^n (in/sec)
INPUT
Equipment
Type
PPVref = 0.089
D = .6
n = 1.50
Large Bulldozer INPUT SECTION IN GREEN
Reference PPV (in/sec) at 25 ft.
Distance from Equipment to Receiver (ft)
Vibration attenuation rate through the ground
Note: Based on reference equations from Vibration Guidance Manual, California Department of Transportation, 2006, pgs 38-43,
RESULTS
PPV =
0.191 _
IN/SEC OUTPUT IN BLUE
81c3
GROUNDBORNE VIBRATION ANALYSIS
Project: 19669 TTM 38636 Date: 10/4/23
Source: Vibratory Roller
Scenario: Unmitigated
Location: Residential to East
Address: 7 Echo Lane, Rancho Mirage
PPV = PPVref(25/D)^n (in/sec)
INPUT
Equipment =
Type
PPVref =
D =
n =
Vibratory Roller INPUT SECTION IN GREEN
Reference PPV (in/sec) at 25 ft.
Distance from Equipment to Receiver (ft)
Vibration attenuation rate through the ground
0.21 .6
1.50 Note: Based on reference equations from Vibration Guidance Manual, California Department of Transportation, 2006, pgs 38-43,
RESULTS
PPV =
0.198
IN/SEC OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Project: 19669 TTM 38636 Date: 10/4/23
Source: Large Bulldozer
Scenario: Unmitigated
Location: Residential to East
Address: 7 Echo Lane, Rancho Mirage
PPV = PPVref(25/D)^n (in/sec)
INPUT
Equipment =
Type
PPVref = 0.089
D = .6
n = 1.50
Large Bulldozer INPUT SECTION IN GREEN
Reference PPV (in/sec) at 25 ft.
Distance from Equipment to Receiver (ft)
Vibration attenuation rate through the ground
Note: Based on reference equations from Vibration Guidance Manual, California Department of Transportation, 2006, pgs 38-43,
RESULTS
PPV =
0.084
IN/SEC OUTPUT IN BLUE
8,65
GROUNDBORNE VIBRATION ANALYSIS
Project: 19669 TTM 38636 Date: 10/4/23
Source: Vibratory Roller
Scenario: Unmitigated
Location: Commercial to Southwest
Resuscitation International (Surgical Supply Store), 35100 Bob Hope Drive #200, Address: Rancho Mirage
PPV = PPVref(25/D)^n (in/sec)
INPUT
Equipment =
Type
PPVref =
D =
n =
Vibratory Roller INPUT SECTION IN GREEN
Reference PPV (in/sec) at 25 ft.
Distance from Equipment to Receiver (ft)
Vibration attenuation rate through the ground
0.21 ill
1.50 Note: Based on reference equations from Vibration Guidance Manual, California Department of Transportation, 2006, pgs 38-43.
RESULTS
PPV = 0.010 IN/SEC OUTPUT IN BLUE
GROUNDBORNE VIBRATION ANALYSIS
Project: 19669 TTM 38636 Date: 10/4/23
Source: Large Bulldozer
Scenario: Unmitigated
Location: Commercial to Southwest
Resuscitation International (Surgical Supply Store), 35100 Bob Hope Drive #200, Address: Rancho Mirage
PPV = PPVref(25/D)^n (in/sec)
INPUT
Equipment =
Type
PPVref =
D =
n =
Large Bulldozer INPUT SECTION IN GREEN
Reference PPV (in/sec) at 25 ft.
Distance from Equipment to Receiver (ft)
Vibration attenuation rate through the ground
0.089
Ill
1.50 Note: Based on reference equations from Vibration Guidance Manual, California Department of Transportation, 2006, pgs 38-43.
RESULTS
PPV =
0.004
IN/SEC OUTPUT IN BLUE
8.67 GROUNDBORNE VIBRATION ANALYSIS
Project: 19669 TTM 38636 Date: 10/4/23
Source: Vibratory Roller
Scenario: With Incorporation of BMPs
Location: Residential to North
Address: 9 Siena Vista Court, Rancho Mirage
PPV = PPVref(25/D)^n (in/sec)
INPUT
Equipment -
Type
PPVref =
D =
n =
Vibratory Roller INPUT SECTION IN GREEN
Reference PPV (in/sec) at 25 ft.
Distance from Equipment to Receiver (ft)
Vibration attenuation rate through the ground
0.21 6.14
1.50 Note: Based on reference equations from Vibration Guidance Manual, California Department of Transportation, 2006, pgs 38-43,
RESULTS
PPV =
0.293
IN/SEC OUTPUT IN BLUE
8x,8
gmdJH
GANDDINI GROUP INC.
714.795.3100 ganddini.com
869
❑ ❑❑❑al El ❑ Er El ❑❑WUi= L❑
r
870
CITY OF RAMC O MIRAGE
July 31, 2024
❑ ❑❑❑ ❑ ❑ II ❑H El ❑❑d ❑❑❑ WE
❑ EL DTI ❑ Ed II II I ED roam- WE
5401 Dinah Shore Drive
Palm Springs, CA 92264
HA HEE
® ❑r❑
r
r
EDE ❑❑
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
D u r D Ir7❑EEEr ❑❑❑
r
® ❑r❑
r
ILE= DE Dal
❑❑ H. ❑❑R ❑❑ ❑ M ©❑❑❑ [II [❑d ❑❑❑❑❑JI❑D- ❑❑❑M ED❑ ❑ ❑WLr ❑[ E ❑ r ❑❑❑ ❑❑E ❑❑ Act (CEQA), for LEE D-❑❑❑ r D-❑® d ❑ ruiLd ❑❑®❑ ❑ ❑❑❑ ❑ D ❑❑ D ❑ ❑ D'®❑❑ ❑ ❑❑ H ❑ ❑❑❑ Cd EMMA Er ErHEE I ❑ ❑❑ MIME D' ❑❑= II ED ❑ [ Ed ❑❑❑DI❑d ❑ D' MUD I❑ fDl DDid ❑ffirDEl ELE❑ ❑ I ❑❑❑❑dD'n 0 E ❑❑❑E ED❑ ErE HE ❑❑❑ ❑El ❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed D'❑® ® Erd a ® El ❑❑ Irmo IUD'❑❑'❑ Er= [EWE ❑❑ ❑❑ ED ❑❑ r ❑❑ ODE D'❑® r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I0003, VAR24I0002, and TTM23®❑❑❑
Project Location: 72094 Ginger Rogers Road (APN: 685T 002) Project DescriptionE The project proposes to subdivide 5.04 gross acres into nine (9) singleE ED❑ I II _ r❑rTd❑❑ I __'❑with lots ranging in size from 16,122 square feet to 16,932 square feet.
Erns r❑❑ LiEIE approval of a variance request to the Very Low Density Residential (RIL2) ❑ HE r❑❑❑©D1 ED TEE MIME ❑EPE LE❑ ❑❑DI❑❑ ❑❑r DIEM iLrd iLr EH HE ❑ HE I❑u ❑ ® ❑r❑ ❑IDEErmT❑❑d ®❑ ❑ ❑ ® LILL ® ❑ ❑d IIDEI JUDE ❑❑❑ ErEIE ® ❑ III E d ❑❑ ❑®❑ ❑❑❑❑ existing single= II r❑I Id OE ❑❑f o _ ® ❑❑❑❑❑
ED I rd IA ❑ 1 u ERE § 21080.3.1, you have thirty (30) d 1_ r❑❑ Em r❑ ®❑ r ❑❑❑❑ ❑ ❑1T[lm ® ❑ rl I ❑ ELT DIE E Er
Y❑❑ ❑ HE ❑= ❑ EPE EIS❑ HEIDE ❑❑❑❑❑ED❑ Er❑li ID- r❑❑❑❑
• ❑❑Er d ©❑ ❑❑(760) 328 CHIDE ❑- HE ❑ DEEI ❑ R ❑❑EIEM ©❑❑❑❑ ❑ LI❑ EEL r❑LET❑❑ ❑ E EVIIIE ❑❑❑ ❑ ❑D1 ❑❑❑ ❑or ❑❑ pod= ad ❑❑❑ I❑ ❑®
r❑C=
V EE —❑
❑ ❑❑I❑r ❑ DELI
DE❑EL❑❑ME ER E DE❑❑R❑ME❑❑
El dH❑ IuT•R Mr �❑
TEL R M.rI871 • (760) 3281 I a UT
HE
1E®
r
EDE ❑ rm.
D r❑❑❑❑
Legend
'4,0
County of R%vo it *. CoIttocnia
Stow Pah,. hn, HERE. OSe' S
FAO, NOAH, USGS. EPA hn.
San deg8scs
Q Survey Parcel Property 685.080-002
FIGURE 1. REGIONAL LOCATION MAP
FIGURE 2. PROJECT VICINITY MAP
DE❑EL❑❑ME ER E DE❑❑R❑ME❑❑
Lnd7❑i • R Mr -imL
❑❑ulR c\ 872T(760)3281ia❑❑
CITY OF RAMC O MIRAGE
July 31, 2024
❑ ❑❑❑ ❑ ❑ DA ME ❑❑❑
❑❑r Ir ] II I 1 ED -❑EM❑❑
84 001 Avenue 54
Coachella, CA 92236
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
D❑D DTErM d l❑❑
❑❑❑ ❑ ❑❑R❑❑ ❑ M©❑❑❑ [ID ED [❑d ❑❑❑❑❑❑❑❑D- ❑❑❑M DI❑ ❑❑Wile-❑EI E❑ r❑❑❑ ❑❑M ❑❑ Act (CEQA), for LEE DEED r D❑® d❑ NIA ❑❑ME❑ ❑❑❑ ❑D ED Er ❑ ❑al= ❑ ❑❑ ❑ ❑ ❑❑❑ [d ❑❑mod D' ErEDE I ❑ HE ❑❑EM Er ❑❑= ❑❑ ❑ [❑d ❑❑❑[❑d ❑ D' MOLE I❑ fUI nsld ❑ E= DE❑ ❑ I ❑❑❑❑d D n ❑ D MOH DE❑ D' ❑ ❑❑ MULLED ❑II ❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed D-❑® ® D -d D- ® Elm Irmo Liaiir-E D'= MIELE ❑❑ ❑❑ ❑0 ❑❑ r ❑❑ UDE E ETh r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I0003, VAR24I0002, and TTM23®❑❑❑
Project Location: 72094 Ginger Rogers Road (APN: 685T 0 002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) singlei LED I ii _ r❑I7d❑❑ I 'T❑with lots ranging in size from 16,122 square feet to 16,932 square feet. a'Efill r❑❑❑❑LEE approval of a variance request to the Very Low Density Residential (RiL2) ❑ HE ❑❑ r❑❑❑©D1 [ID TEE MIME ❑D E ED ❑❑D= ❑❑r MEE iLrd iLr El ❑❑ ❑ ❑❑ I❑u ❑ ® ❑ IE ❑LLErIT❑❑d ®❑ ❑ ❑ TE u❑❑ ® ❑ 0d= LrmLI ❑ [ID❑ d ❑❑ ❑H= ❑❑❑❑ existing single ❑ I 0 I r❑ d❑❑ ❑❑f I _ ® ❑❑❑❑❑
a I rdu❑m ❑ I I I ❑R❑ § 21080.3.1, you have thirty (30) d 1_ fEE Em r❑ ®❑ r❑❑❑❑ ❑ [TUTU ® ❑rl1 ❑ QD' ED[ Er
Y❑❑ ❑ ❑❑ ❑❑MU ❑ E E LIE D H ❑®❑. ❑❑❑❑❑ LEE am [ Er r❑❑❑❑ uDDEr d ©❑ ❑❑(760) 328 ME❑❑ ❑- ❑❑ ❑ DEELI ❑ R ❑❑LOLLM ©❑❑❑❑ ❑ EE ❑ M r❑QD-00 ❑ E ErElIE ❑❑❑ ❑ ❑❑d ❑❑❑ ❑D- ❑❑ [Ed=Id ❑❑❑ I❑ ❑®
I ❑❑ -❑
❑ ❑❑❑r ❑ LED-
DEEELo oMEi ER E DE❑❑R❑ME❑❑
En17 L 10D ❑❑ ❑❑ _ ii ❑ • R Mr rmEl
Mr - (760) 32811 a ❑❑
873
❑❑
r
DEL ❑ roiD.
D r❑❑❑❑
CITY OF RAMC O MIRAGE
July 31, 2024
❑ ❑❑❑ ❑ ❑ ❑❑d ❑❑❑ ❑❑❑ QDd =El
mEm ❑ ❑= ❑ ❑❑❑T II rI ❑
84 245 Indio Springs Parkway
Indio, CA 92203
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
D iJL7 ❑ ❑❑EEDr
❑❑❑ ❑ ❑❑R❑❑m❑ M CID ED [MEd ❑❑❑❑LWEEr ❑❑❑I LIE ❑❑ li rum E❑ r❑❑❑ ❑❑CID ❑❑ Act (CEQA), for EL D-❑❑❑md E ELI dE r[IDad ❑❑DEE ❑❑❑ ❑❑ ED ❑ ❑a'®❑❑ ❑ ❑❑ ❑ ❑ ❑❑❑ Cd ❑❑ TEll Ia' ErEDE I ❑ ❑❑ ❑❑ ❑ a' ❑❑IThEL 0 DIALED TA ❑❑❑C❑❑d ❑ Er ❑❑❑ I I❑ LE Ld ❑ m PM ❑ ❑❑❑❑d Er[ ID Er LIME LIE ErE EL ❑❑❑ ❑m ❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed a= TO ad a- ED ❑❑ I EDE TIJEErE o- E rm❑❑❑ ❑❑ ❑❑ =DE r. ❑❑ EE Dram r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I0003, VAR24I0002, and TTM23CIDC'
Project Location: 72094 Ginger Rogers Road (APN: 685 _ 002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) singleE LED Jd❑❑ ! !J❑lwith lots ranging in size from 16,122 square feet to 16,932 square feet. ❑ a ❑CID rMOLE o approval of a variance request to the Very Low Density Residential (RLILL2) ❑ [11 ❑❑ r❑❑❑©❑d [11 T❑❑ ❑ I❑Err ED MIME ❑ErEI CID❑ Erd Er CID ❑❑ m❑ ❑❑ UI ❑ ILL ❑LEu❑ffm❑d DiDmm El= DELI ❑ ❑d [ECID Lr❑❑❑ ❑❑❑ a'❑]] ® ❑ ®❑ d ❑❑ ❑ u ❑ ❑❑❑❑ existing single= r❑I Id❑❑EE I ® ❑❑❑❑❑
I II I
CID ❑co=rd EL EEL ❑R❑ § 21080.3.1, you have thirty (30) d ❑ Ca❑❑ [ID❑ r❑ T❑❑❑CIDIB [E] r❑❑❑❑ ❑I fl ❑ ® ❑rl J❑
Ym ❑ ❑❑ ❑ ❑r❑ nu r❑ ❑E❑. ❑❑❑❑❑CM D. ID ILr r❑❑❑❑m ❑ ❑ ❑❑ ❑ ®❑❑Er d ©❑ ❑❑(760) 328 ❑❑ Er ❑❑ ❑m 1❑ml ❑ R ❑❑ EM ©❑❑❑❑ ❑Lam❑
❑DE r❑OJDE LEE a-❑® ❑❑❑ ❑ ❑❑d ❑❑❑ ❑a- ❑❑ [Ed®C❑d ❑❑❑m❑
r❑L=
DE❑EL❑❑ME ER E DE❑❑R❑ME❑❑
❑l Mr u❑
❑❑I_ R Mr'❑874• (760) 3281 Ia Li,
r
Er r❑❑❑❑
CITY OF RAMC O MIRAGE
July 31, 2024
❑ ❑❑❑ II ❑ ❑❑d =Ed rim
❑ I EPEE ❑ MEI M ❑d r ElEIT Hr ®❑
52701 CA Highway 371
Anza, CA 92539
r
❑r❑
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
D❑a- ❑r®❑
r
® ❑r❑ Er
I=❑ ❑
r
M ❑drEEI
❑❑❑ H. ❑❑R❑❑ ❑ M©❑❑❑ [II IH lEd ❑❑❑❑❑❑❑❑a- ❑❑❑M IH ❑❑I❑I1r❑Ei E❑ r❑❑❑ ❑❑M ❑❑ Act (CEQA), for lE a-❑❑❑ r a-❑® d ❑ NIA ❑❑®❑ ❑ Em ❑ a ❑ ❑ a- ❑ ❑ EI- ❑ ❑❑ ❑ ❑ ❑w Cd ❑❑ r Er ErHHH I ❑ ❑❑ MEM Er ❑❑IHII II w ❑ T❑d mEnEd ❑ Er ❑❑❑Ed H rUI rid ❑IIll r❑❑ ❑ I ELEA Drn ❑a' wE w❑ a'❑ ❑❑ ❑❑❑LLLH ❑� ❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed a'❑® I ad a- ® ❑❑ I [I❑ Ida'❑❑'❑ a-= ®❑❑❑ ❑❑ HE LE ❑❑ r ❑❑ DEE a❑® r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I0003, VAR24I0002, and TTM23[IEDED
Project Location: 72094 Ginger Rogers Road (APN: 685T 002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) singlei w❑ I II _ r❑wr ❑❑ I __'❑with lots ranging in size from 16,122 square feet to 16,932 square feet. a ❑ID rw approval of a variance request to the Very Low Density Residential (RIL2) ❑ HE ❑❑ r❑❑❑©al CD TIDE ❑❑r❑❑❑ ❑ErE [l❑ ❑❑E= ❑❑r MEE iLrd iLr w ❑❑ ❑ ❑❑ I❑u ❑ ® Hrl ❑EET❑T❑❑d LEE ❑ ❑ ® w ® ❑ ❑d = JUDD ❑❑❑ ErEr ® ❑ LED d w ❑D= ❑❑❑❑ existing single ❑ I0 r❑ d❑❑ ❑❑f u _ ® ❑❑❑❑❑
ED I rd IA ❑ I u HRH § 21080.3.1, you have thirty (30) d 1_ r❑❑ Em r❑ ®❑ r❑❑❑❑ ❑ [TUTU ® ❑rlI ❑ Ur wDI Er
Y❑❑ ❑ ❑❑ ❑❑M ❑ a•❑ [polo ❑®❑. ❑❑❑❑❑LEE E EIE [E- r❑w❑
LD❑❑❑r dim ❑❑(760) 328 MEDD ❑- ❑❑ ❑EDEED ❑ R ❑❑HILLM ©❑❑❑❑ ❑ w❑ DUE r❑LI -❑❑ ❑ E E-❑® ❑❑❑ ❑ ❑❑d ❑❑❑ ❑a- ❑❑ [Ed=ad ❑❑❑ I❑ ❑®
r❑El
I❑❑ ❑
DEEELli oMEi ER E DE❑❑R❑ME❑❑
En17 L T i ❑❑ ❑❑ _ ii ❑ • R Mr rmEI
M r (760) 3281 a LID875
❑❑
CHM
r
w
❑w ❑ poiE.
o r❑❑❑❑
CITY OF RAMC O MIRAGE
July 31, 2024
❑ ❑❑❑ II II ❑ ❑❑d =AHED
❑ LErica Schenk❑❑❑❑©❑a-
52701 CA Highway 371
Anza, CA 92539
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
Dear Chairperson Schenk,
❑❑ ❑ ❑❑R❑❑ ❑ M fEEEI Ell ED E❑d ❑❑❑I EEr ❑❑❑E HE ❑ ilwErEn E❑ r❑❑❑ ❑❑E ❑❑ Act (CEQA), for EG❑I D ❑❑❑ r a-❑® d ❑ NIA ❑❑O ❑ ❑❑❑ ❑ a ❑ ❑ a ❑ ❑ a n= ❑ ❑❑ ❑ ❑ ❑❑❑ ld EDUIEr_cl a' ErHHH I ❑ HE MIME Cr ❑❑= II ELI ❑ TEd ❑❑❑r❑d ❑ Er MELD HE [ADE= LEE ❑ I ❑❑❑❑da'EiI HE DEERE ED❑ ErH ❑❑ ❑❑❑ II ❑H ❑M (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed a-❑ I ® a'd a ® Elm Irmo IUD liaE a -m❑ DEEM ❑❑ ❑❑ ❑❑ r ❑❑ om a ❑m r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I0003, VAR24I0002, and TTM23®❑❑❑
Project Location: 72094 Ginger Rogers Road (APN: 685E m 002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) singlei LED I II _ r❑ADD I __'❑with lots ranging in size from 16,122 square feet to 16,932 square feet.
Erns r❑❑r1❑DE approval of a variance request to the Very Low Density Residential (RIL2) ❑ DM ❑❑ r❑❑❑©❑d Ii TEE ❑❑IITFIH ❑ErH lI❑ ❑❑D= ❑❑r HEM iLrd iLr DI ❑❑ ❑ HE I❑u ❑ ® rrTT❑ ❑L[ulrm ❑❑d ®❑ ❑ ❑ ® LTh ® ❑ ❑d ®HI JUDO ❑❑❑ ar❑lI Ill ❑ III E d ❑❑ ❑®❑ ❑❑❑❑ existing single= II rill Id OD ❑❑I u _ ® ❑❑❑❑❑
a I rd IA ❑ I I I ❑R❑ § 21080.3.1, you have thirty (30) d 1_ r❑❑ Erm r❑ ®❑ r ❑❑❑❑ ❑ [TUTU ® ❑ r l I ❑ Ur EDI Er
Ym ❑ ❑❑ Emu ❑ ❑r❑ [wa-❑ ❑®❑. ❑❑❑❑❑E:O❑ From [Er r❑❑❑❑
Em❑❑❑r d ©❑ ❑❑(760) 328 EED❑❑ ❑- HE ❑ DEM ❑ R ❑❑LILLM ©❑❑❑❑ ❑ EE❑ DUE r❑®-❑❑ ❑ D Er❑® ❑❑❑ ❑ ❑❑d ❑❑❑ ❑a- ❑❑ =Did ❑❑❑ I❑
❑®
I ❑❑ -❑
❑❑❑❑r ❑EDED.
DEEELEEMEE ER E DE❑❑R❑ME❑❑
En17 L T i ❑❑ ❑❑ _ ii ❑ • R Mr m❑
Mr (760) 3281 a❑❑
876
❑❑
lam®
r
HE
❑� ❑ �.
E r❑❑❑❑
CITY OF RAMC O MIRAGE
July 31, 2024
❑ ❑❑❑ II ❑ ❑❑d ❑❑❑1ld CID❑❑
IIMO ME❑RED E I r I I❑❑I❑r II Dr III
52701 CA Highway 371
Anza, CA 92539
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
DLR. ❑❑TEI'❑LD©❑EM. E
Er
❑❑ ❑ ❑❑R❑❑m❑ M ©❑❑❑ CID OI❑ ❑❑❑❑❑_❑❑Er ❑❑❑L HE ❑ ❑ II r E❑ r❑❑❑ ❑❑E ❑❑ Act (CEQA), for HE ❑-❑❑❑LEd Er= dE r®❑d ❑❑ LE ❑❑❑ ❑❑ Ell Er ❑ ❑DELEE ❑ ❑❑ ❑ ❑ ❑❑❑ Cd DELTA Er Er❑❑❑ ❑ ❑❑ ❑❑ ❑ ❑- ❑❑= II DEEM T❑d ❑❑❑C❑❑d ❑ Er ❑❑= I❑ L fLId ❑ LEE ❑ ❑❑❑❑d ErE ❑d' ❑❑❑U LEE ErE ❑❑ ❑❑❑ ❑E ❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed E EE0 ® ad d- ED ❑❑ I TEE 01TEErEl El- ❑ rn [1EE ❑❑ ❑❑ CO ❑❑ r. ❑❑ ®❑ d-❑® r
II
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I0003, VAR24i0002, and TTM23®C' II
Project Location: 72094 Ginger Rogers Road (APN: 685 _ 002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) single ED [Mir L id LE ! ! rLilwith lots ranging in size from 16,122 square feet to 16,932 square feet. I_ ❑ Erin r❑LC❑! approval of a variance request to the Very Low Density Residential (RLLL2) ❑ MI ❑❑ r❑❑❑©Ed [ID TEE ❑ I❑ErE [ID❑ DEEMED ❑d-❑ Li❑ Erd Er [ID ❑❑ m❑ ❑❑ UI LI 711-I ❑EET TTI❑d ®❑❑ -Trin ❑ EL CID❑ IID ❑ Ed EEL Pr❑❑❑ ❑❑❑ Eram ® ❑ ®❑ d ❑❑ ❑ II ❑ ❑❑❑❑ existing single= rill Id❑❑EE I I ® ❑❑❑❑❑
I II I
❑m=rd l iJi ll [I= ❑R❑ § 21080.3.1, you have thirty (30) d ❑ [LL [ID❑ r❑ =EU= [E] r❑❑❑❑ ❑I fl ❑ ® ❑rl ❑ ar JLdi ❑r
Y❑❑ ❑ ❑❑ DELHI ❑ ErE [IDS❑ ❑M❑. ❑❑❑ a LEE d-❑ Iu- r❑❑❑❑m ❑ ❑ ❑❑ ❑®❑❑d' d©❑ ❑❑(760) 328 ❑❑ Er ❑❑ ❑CIE❑ml ❑ R❑❑ EVl©❑❑❑❑❑EE
❑EE r❑CID EIE LEE d•❑® ❑❑❑ ❑ ❑❑d ❑❑❑ ❑d- ❑❑ [Ed®CIDd ❑❑❑CD❑ ❑®
r❑m
I ❑L, -❑
❑ ❑❑❑} ❑ ®❑❑d'
DEEELo oMEi ER E DE❑❑R❑ME❑❑
En17 L T i ❑❑ ❑❑ _ ii ❑ • R Mr m❑
M r (760) 3281 Ia ❑❑
877
r
❑� ❑ CID❑.
Er r❑❑❑❑
CITY OF RAMC O MIRAGE
July 31, 2024
L ❑❑ E CEDED ❑ ❑❑d ❑❑❑ ❑❑❑ ❑❑d E ❑❑❑❑❑ QDd LEM
▪ ER DE ❑ ❑❑❑❑D-❑ ❑❑ ❑❑©❑a- ❑
P.O. Box 189
❑ p ED- ❑ ErHE ❑ ❑ ❑❑❑❑❑MIDEE
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
D❑a ❑ ❑ar
1D'
❑❑❑❑D -E
❑❑❑ ❑ ❑❑R ❑❑m❑ M ©❑❑❑ [❑ DIE End ME Er ❑❑❑[ID [ID❑ ❑ DWITEED E ❑m❑❑❑ ❑❑O ❑❑ Act (CEQA), for LEE a❑❑❑ r a-❑® d❑ rad =ED ❑❑❑ ❑❑ ❑❑D -I ❑ Dam= ❑ ❑❑ ❑ ❑ ❑❑❑ Cd ❑❑ d mE D ❑❑L1ll❑111 _ J❑ ❑❑ ❑❑ ❑ Er ❑❑LI❑DIII DM ❑ [Ed] ❑❑❑[❑d ❑ Er ❑ it DEEElm❑ [m IQDd ❑ EMI❑ ❑ ❑❑❑❑d G' EE ❑ D m❑❑❑ DE DID ❑❑ ❑❑ ❑ I. EEO ❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed D ❑ 1 ® ad a- ED EI ❑❑ TEE Imo-❑❑' ❑ Er FITTED ❑❑ ❑❑ [ ❑❑ r ❑❑ EE D' ❑®[m Project Title: Tentative Tract Map No. 38636
Project No.: EA23LD003, VAR24L0002, and TTM230D❑❑❑
Project Location: 72094 Ginger Rogers Road (APN: 685=M02) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) single❑ ED Mir❑❑A❑❑= I®with lots ranging in size from 16,122 square feet to 16,932 square feet. ❑❑❑ Erni r❑❑❑❑ approval of a variance request to the Very Low Density Residential (RLILL2) ❑ [m[m ❑❑ r❑❑❑©❑d ❑] TEE ❑❑[ID❑❑ ❑Dr❑ ED I ❑❑LID❑❑ ❑Er❑ ErdEr IE ❑❑ I❑ EE ❑ [® rThrl ELE❑®❑d CEO ❑ ❑ ® IDE LE ❑ ALICE 'JUDE ❑❑❑ ❑r❑® ® TIED ®❑ d ❑❑ ❑ u ❑ ❑❑❑❑ existing single= ID rOrld ❑❑ ❑❑I 0 ID ❑❑❑❑❑
LID ❑m=rd F i❑m ❑
I I I
r❑❑❑❑❑❑❑ LI ❑TFT 1
❑R❑ § 21080.3.1, you have thirty (30) d ❑ LEE LIE r❑mml❑ ❑r[DzD❑MT[ID®❑rET Th
LEM®
r
Y❑❑ E. ❑❑ mlUE[al E ErD [MIDI ❑r[111❑. ❑❑❑❑❑ D ETIDEI r❑❑❑❑ ❑1❑❑❑ ❑❑ I ❑ Lm❑❑❑r d ©❑ ❑❑(760) 328 CEDED ❑' I ❑❑ ❑ ❑ ❑ R ❑❑EDAM r❑❑❑❑❑ ❑ED E ❑ E r❑ ITED ❑]❑ D-❑® ❑❑❑ ❑ ❑❑d ❑❑❑ ED- ❑❑ Did MEE d ❑❑❑ I❑ ❑®
r❑DE
❑L, ❑
EMIT =Err
DEEIELFIEMEI ER E DE❑❑R❑ME❑❑
❑i rT ❑❑ ❑ n 1E1_ ii ❑ • R Mr u❑
❑❑I1LR__ !IIMIr iw7w•(760)3281' LIE
❑ LI❑
Er r❑❑❑❑
CITY OF RAMC O MIRAGE
July 31, 2024
M Ermm ❑❑❑d ❑ M I❑ Eld L1❑❑
El ❑R ❑❑ErLM a- ❑❑ ❑❑©❑a -I I
❑❑❑❑❑ ❑ ❑❑ CITE REF d
EDEDIEDEEE DEEM
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
DOD- ❑ ❑❑
ru
a-
❑ M Er=D
❑❑ ❑ ❑❑R ❑❑ ❑ M r❑❑❑ [I LEE LEd ❑❑❑❑❑❑❑❑Er ❑❑❑M LE❑ ❑ ❑WI1L EL E ❑ r ❑❑❑ ❑❑E ❑❑ Act (CEQA), for ED a ❑❑❑ r a-❑® d ❑ NIA ❑❑LE ❑ ❑❑❑ ❑ a ❑ ❑ a- ❑ ❑ a-®❑❑ ❑ ❑❑ ❑ ❑ ❑❑❑ Cd ❑❑I TELd Er ErEEE I ❑ HE ❑❑EM Dr ❑❑= II _ E ❑ [❑d ❑❑❑n❑d ❑ Er ❑❑❑U I❑ rUI rid ❑❑DI r❑❑ ❑ I ❑❑❑❑dDrrL ❑Er ❑❑❑L ED❑ ErE ❑❑ ❑❑❑ II ❑U ❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed Er= To ado- ® ❑❑ I Erg❑ Imo'❑a Er a= DEEM ❑❑ ❑❑ LI ❑❑ r ❑❑ ®❑ a-❑® r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23!0003, VAR24I0002, and TTM23®❑❑❑
Project Location: 72094 Ginger Rogers Road (APN: 685T 002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) singleE LED I II _ r❑rTd❑❑ I _ __'❑with lots ranging in size from 16,122 square feet to 16,932 square feet.
Erns r❑❑r1❑Ei approval of a variance request to the Very Low Density Residential (RiL2) ❑ HU ❑❑ r❑❑❑©❑d L TEE ❑❑ DE ❑ErE LE❑ ❑❑D❑❑ ❑❑r! MEE iLrd ilr L ❑❑ ❑ ❑❑ FEE ❑ ® rTrTl ❑EDDE T❑❑d ®❑ ❑ ❑ ® LIL❑ ® ❑ ❑d [EL JUDE ❑❑❑ a•❑LE ® ❑III]❑ d ❑❑ ❑ E ❑❑❑❑ existing single®❑ II r❑I id❑❑ ❑❑I I _ ® ❑❑❑❑❑
DE I rdu❑m ❑Iii ERE § 21080.3.1, you have thirty (30) d I_ fEE [ID❑ r❑ ®❑ r ❑❑❑❑ ❑ [TUTU ® ❑ r l I ❑ ILI DM Er
Y❑❑ ❑ ❑❑ ❑= ❑ ErE [EQI E ❑®❑. ❑❑❑❑❑ ED❑ am I Er r❑❑❑❑
uDDEr d ©❑ ❑❑(760) 328 CHILD Er HE ❑ICI❑EE ❑ R❑❑LIEM ©❑❑❑❑ DEED DUE r❑®-❑❑ ❑ E a-❑® ❑❑❑ ❑ ❑❑d ❑❑❑ EEr ❑❑ [Ed=Ed ❑❑❑ I❑
❑®
I❑❑ ❑
DEEELli oMEi ER E DE❑❑R❑ME❑❑
❑i17L Ti❑❑❑❑_ii❑•R Mr iuC
Mr - (760) 3281 I a !❑❑
879
❑❑
CUM IE
r
Im
❑DE ❑ roi0.
o- r❑❑❑❑
CITY OF RAMC O MIRAGE
I❑
July 31, 2024
M Er❑❑❑❑ ❑❑❑d iAVI
DEEMED Er Es'Mr=
❑❑❑❑❑ ❑❑❑ CITE REF d
❑ ❑❑❑ DEE ❑ ❑❑❑❑❑
Ld E❑❑
❑r❑
r
r
®❑ ❑ WILL r
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
DOE- ❑rIED
r
®❑r❑ D-
=OE ❑
r
❑❑❑ ❑ ❑❑R❑❑ ❑ Mr= L E❑ TU❑d ❑❑❑❑❑❑❑❑a- ❑❑❑M CM ❑❑w r❑ui E❑ r❑❑❑ ❑❑E ❑❑ Act (CEQA), for ®❑ ❑ mD r D-❑® d ❑ NIA =ME ❑ ❑❑❑ ❑ ❑ ❑ ❑ D. ❑ ❑ [- um ❑ ❑❑ ❑ ❑ ❑❑❑ Cd ❑❑ r Er Er EDE I ❑ ❑❑ ❑❑EM Er ❑❑= II I❑❑ ❑ [Ed ❑❑❑[❑d ❑ E DEED I❑ fDi fwd ❑ ❑ h ❑ I ❑❑❑❑d a' Ili ❑ d' MOH ED❑ ❑ E ❑❑ MEWED ❑ii ❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed o-❑® ® Ltd o- ® [d ❑❑ I ro❑ ITE1.11D-❑ El -m❑ =DE ❑❑ ❑❑ LE ❑❑ r ❑❑ ®❑ E -❑® r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I0003, VAR24I0002, and TTM23®❑❑❑
Project Location: 72094 Ginger Rogers Road (APN: 685T 002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) singlei C❑ I ii r❑7 LID I '❑lwith lots ranging in size from 16,122 square feet to 16,932 square feet.
Erou r❑L1L1❑= approval of a variance request to the Very Low Density Residential (RIL2) ❑ HE ❑❑ r❑❑❑r❑d [ID [P❑❑ ❑❑ITFIE ❑Er❑ ❑❑DI❑❑ ❑❑r MEE Lrd iLr ED ❑❑ ❑ ❑❑ I❑u ❑ ® I m ❑IDEDIDITETI❑d ®❑ ❑ ❑ ® LILL ® ❑ ❑d [ED] J❑❑❑ ❑❑❑ JUDI ® ❑III]❑ d ❑❑ ❑®❑ ❑❑❑❑ existing single ❑ HH r❑ Co ❑❑f u ® ❑❑❑❑❑
HD I rdu❑m ❑ I I I ❑R❑ § 21080.3.1, you have thirty (30) d 1_ r❑❑ [ID❑ r❑ ®❑ r ❑❑❑❑ ❑ [TUTU ® ❑ r l l ❑ IL DM ❑'
Y❑❑ ❑ DE ❑❑= ❑ Er❑ ELIE ❑®❑. ❑❑❑❑❑ED❑ Er❑il IEr r❑❑❑❑
FE❑❑❑r d©❑ ❑❑(760) 328DEMEI E- ❑❑ ❑ DEM ❑ R IMEDE❑=❑
❑ D r❑® ❑❑ ❑]❑ a-❑® ❑❑❑ ❑ ❑❑d ❑❑❑ ❑D- ❑❑ [odUC❑d ❑❑❑ I❑ ❑®
I❑❑ ❑
❑❑❑I❑r LIEDED-
DEEELli oMEi ER E DE❑❑R❑ME❑❑
En17 L T i ❑❑ ❑❑ _ ii ❑ • R Mr rmEI
Mr - (760) 3281 a ❑❑
880
❑❑
l�
r
❑� ❑ IIII❑.
o- r❑❑❑❑
CITY OF RAMC O MIRAGE
July 31, 2024
❑ ❑❑L=❑❑ ❑rte❑
❑ ❑L NE czal ❑
P.O. Box 1899
Yuma, AZ 85366
fi
�❑❑LrEY❑❑❑R❑ r
❑ DDIE ❑ ELITE ED ❑K ❑
E ❑❑LI r❑
❑❑ E
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
DOLT ❑
❑ ❑ ❑❑©❑ DE EKE
❑ ❑ ❑TETE
❑❑❑I
❑❑
DEL ❑ DERIDE= M ©❑❑❑ MI ED Hod ❑❑❑❑❑_❑❑Er ❑❑❑M] E❑ ❑ ❑ li r E ❑ r ❑❑❑ ❑❑E ❑❑ Act (CEQA), for ®❑ DEED r DELI dE r®❑d ❑❑LDEE ❑❑❑ ED ED Er ❑ ❑❑r®❑❑ ❑ ❑❑ ❑ ❑ ❑❑❑ Ld ❑❑mid ICr a DELI I ❑ ❑❑ ❑❑ ❑ D- ❑❑LI❑III ii ❑❑❑= Tad ❑❑❑niCd ❑ Er ❑❑❑❑7 ETU fHd ❑ LIE ❑ ❑❑❑❑dd'L ❑D' ❑❑❑U ED❑ D'❑ ❑❑ ❑❑❑ ❑ M ❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed D-❑® ® E -d o- ® ❑❑ ITC= [IDS IDErE E- ❑ r❑❑❑❑ ❑❑ ❑❑ LE ED r. EE ®❑ Eram r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I0003, VAR24i0002, and TTM23®❑'
Project Location: 72094 Ginger Rogers Road (APN: 685 _ 002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) single DE❑ Lml1rL Jd❑❑ ! !J❑lwith lots ranging in size from 16,122 square feet to 16,932 square feet. ❑ Er❑L r❑❑❑❑❑ L approval of a variance request to the Very Low Density Residential (RIILL2) ❑ HE ❑❑ r❑❑❑©Ed EL TEE ❑❑IJE[ELI I❑Dr❑ LED ❑❑EM❑❑ ❑E-❑ ❑rd Er [ ❑❑ ❑❑❑ ❑❑ m7 ❑ ❑❑❑ ❑LET -F 1Ld ®❑❑m"❑❑ El= ED❑ LI ❑ Ed [DIE ❑r❑❑❑ ❑❑❑ Eram ® Cl ®❑ d ❑❑ ❑ u E EDEE existing single= rill Id❑❑❑❑ I ® ❑❑❑❑❑
I II I
❑Ozrd ❑i ❑R❑ § 21080.3.1, you have thirty (30) d ❑ TED CM r❑ Im r❑❑❑❑ El fl ❑ ® al JD
Ym ❑ ED Dam ❑ Er❑ LILT E ❑EITI❑. MEDDLED E-❑ ILr r❑❑❑❑ E ❑ ❑ ❑❑ ❑ ❑7❑❑D d ©❑ ❑❑(760) 328 ❑❑ ❑r ❑❑ =MD] ❑ REEF EM ©❑❑❑❑ ELM
❑DE r❑EI ❑❑ LEE Er❑® ❑❑❑ ❑ ❑D1 ❑❑❑ ❑D- ❑❑ ®d®C❑d ❑❑❑❑❑❑ ❑®
r❑�
❑ EE —❑
DE❑EL❑❑ME ER E DE❑❑R❑ME❑❑
❑i ❑ �❑ • R M r u❑ T
HE R Mr_ • (760) 3281 I a LE
�8 81
r
ED
❑� ❑ �❑.
Er r❑❑❑❑
CITY OF RAMC O MIRAGE
E
July 31, 2024
❑ ❑❑ ❑❑ ❑rte❑ ❑❑ED ❑Er Y❑❑ ❑ RE
❑ ii ❑Jill McCormick❑❑ I rLl ❑r❑ r
P.O. Box 1899
Yuma, AZ 85366
r
®❑❑
r
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
Dear Historic Preservation Officer McCormick,
❑❑❑ ❑ mR❑❑m❑ M fEEE [II DIE Hud ❑❑❑❑Lm❑arm❑❑❑L UD❑ ❑ ❑lIELr❑ m E❑ r❑❑❑ ❑❑E ❑❑ Act (CEQA), for LEE D-❑❑❑ r Er= d ❑ r ad ❑❑ ME ❑ ❑❑❑ ❑ ❑ ❑ ❑ Er ❑ ❑ an= ❑ ❑❑ ❑ ❑ ❑❑❑ Cd ❑=d Er ErEE U1❑ LI ❑❑ ❑❑ ❑ a- ❑❑E❑ETU ❑❑ ❑ Cr❑d ❑❑❑L❑d ❑ Er m r❑❑❑i ❑ H MAE EU W❑ ❑ ❑❑❑❑dErEII ❑d' I❑❑❑L ED Er❑ ❑❑ ❑❑❑❑J_II_I ❑H ❑Ll]❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed a-❑® ® ado- LE El EE f= IIIEtED-E a- ❑ LEEELI ❑❑ ❑❑ LE ❑❑ r ❑❑ ®❑ Er= Project Title: Tentative Tract Map No. 38636
Project No.: EA23I 0003, VAR24I 0002, and TTM23! ' li
Project Location: 72094 Ginger Rogers Road (APN: 685 IL : 002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) single❑ C0❑ r❑Ttc ❑❑ I _'7lwith lots ranging in size from 16,122 square feet to 16,932 square feet. ❑❑❑ Er= r❑❑❑❑mE approval of a variance request to the Very Low Density Residential (RJLC2) ❑ �� ❑❑ r❑❑❑©❑d ED Tm ❑❑T❑❑ ❑ErE ED DEEMED ❑ErE DUE
❑ E0 ❑rio❑ TLIEd LE❑ ❑ ❑ TM ID❑ E ❑ Al= ❑ EID0 ❑❑❑ ❑r❑ill existing single ❑ Ii r❑
❑EErd F IEEE ❑
I I I
(LEI ❑❑ FI _ ® ❑❑❑❑❑
Erd Er HE ❑❑
❑ LEE d CIE ❑
❑R❑ § 21080.3.1, you have thirty (30) d ❑ED r❑m[TTI❑
r❑❑❑❑ ElmE EE1TTfl
❑rlI ❑ 1lEr D A-
❑ ❑❑
❑ ❑❑❑❑
Y ❑❑ ❑ ❑❑ ❑❑UDE1 ❑ ❑r ❑ Enr ❑ ❑ 1 ❑. ❑❑❑❑❑ LE❑ O ❑uI m a r ❑EEE W11LWJ❑ HE I ❑ HEDEr d ©❑ ❑❑(760) 328 ELIDED ❑- ❑❑ ❑ ❑ ❑ R ❑❑LIILM r❑❑❑❑❑ ❑ CM HU ❑ E r❑ID-DE ❑ E Er❑® ❑❑❑ E ❑❑d ❑❑❑ ❑a- ❑❑ ]d=ad ❑❑❑ I❑
❑®
r=
DE❑EL❑❑ME ER E DE❑❑R❑ME❑❑
❑i H❑ 1 • R Mr PMEI
❑❑i_ R M_r' • (760) 3281 ! UT
882
LLE
Il
r
❑ C0❑
Er r❑❑❑❑
CITY OF RAMC O MIRAGE
July 31, 2024
❑ ❑❑I HE ❑rte❑
❑ ❑Qrd❑❑
P.O. Box 1899
Yuma, AZ 85366
II
�❑ ❑EP❑Y❑❑ ❑ RE
❑❑❑®❑❑r❑❑❑d DOLED HE
rLEWILI
❑❑ ❑r ED
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
DoEr ❑r❑ [P ❑❑LIE❑ ❑❑
❑❑ ❑r®❑
❑❑❑
❑❑OM
❑❑❑ ❑ ❑❑R❑❑ ❑ M©❑❑❑ THEE Ell❑d ❑❑❑❑❑❑❑❑a- ❑❑❑M DE❑ ❑❑I❑I _ r❑LI EE r❑❑❑ ❑❑E HE Act (CEQA), for LEE ❑ EDE r D-❑® d ❑ ruiLd =ME ❑ ❑❑❑ ❑ ❑I HE ❑- ❑ ❑ r®❑❑ ❑ ❑❑ ❑ ❑ ❑❑❑ Cd ❑❑dillal Er D -Ern I ❑ HE ❑❑EM ❑- ❑❑= II HE ❑ TEd ❑❑❑[❑d ❑ Er HEEL I❑ fUI nod ❑ MD DE❑ ❑ I ❑❑❑❑d Er I I ❑ d' MOH ED❑ ❑ E HE ❑❑ ❑ LEW ❑DI ❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed ❑ DE ® ❑'d Er ® Elm IT= Lai -lip -Er a -m❑ [mm ❑❑ ❑❑ ED ❑❑ r ❑❑ ED ❑ EED r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I0003, VAR24I0002, and TTM23®❑❑❑
Project Location: 72094 Ginger Rogers Road (APN: 685T 002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) singlei EI❑ I II _ r❑I7d❑❑ I _ __'❑with lots ranging in size from 16,122 square feet to 16,932 square feet.
Era' r❑❑❑❑= approval of a variance request to the Very Low Density Residential (RIL2) E HE r❑❑❑©❑d ED TEE ❑❑I❑❑ ❑D❑ DE❑ ❑❑D❑❑ ❑❑r =LE iLrdiLr ED HE E HE I❑u ❑ ® rm❑ ❑ELE T❑❑d ®❑ ❑ ❑ ® Lai ® ❑ ❑d [LE Er= ❑❑❑ DUE ® ❑ LED dm ❑®❑ ❑❑❑❑ existing single ❑ I 0 I r❑ d❑❑ DE u _ ® ❑❑❑❑❑
ED I rd ID ❑ I I I ❑R❑ § 21080.3.1, you have thirty (30) d 1_ r❑❑ [HE r❑ RED r ❑❑❑❑ ❑ [TUTU ® ❑ r i I ❑ ELT
Y❑❑ ❑ ❑❑ ❑❑EU ❑ ❑r❑ LIillE❑ ❑®❑. ❑❑❑❑❑E:D❑ o -❑DE [Er r❑❑❑❑ DEDEr d ©❑ ❑❑(760) 328 DED❑❑ ❑- HE ❑ DEM ❑ R ❑❑EILLM ©❑❑❑❑ ❑ EE DUE r❑® ❑❑ ❑ E a-❑® ❑❑❑ ❑ ❑❑d ❑❑❑ ❑Er ❑❑ [Ed =Did ❑❑❑ I❑ ❑®
r❑EE
I ❑❑ E
❑ ❑❑❑T ❑ LIED-
DEEELo oMEi ER E DE❑❑R❑ME❑❑
En17 L T i ❑❑ ❑❑ _ ii ❑ • R Mr m❑
Mr - (760) 3281 a ❑❑
883
HE
[EU
r
11 ❑a ❑ rm
E r❑❑❑❑
CITY OF RAMC O MIRAGE
July 31, 2024
R❑❑ ❑❑❑ El Eat ❑❑❑❑❑❑
❑ ❑ ❑❑ ❑❑❑
P.O. Box 391670
Anza, CA 92539
EEL DOTED -
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
D ❑a ❑ ❑❑LID
Ll ❑❑ TED❑❑
❑❑❑ ❑ ❑❑R❑❑ ❑ M TIE= DE❑ [❑d ❑❑❑❑❑LU❑a- ❑❑❑I ED❑ ❑❑w r❑EI E❑ r❑❑❑ OCHE ❑❑ Act (CEQA), for ED❑ Iar❑❑❑ r D ELE d ❑ NIA ❑❑ I ❑ ❑❑❑ ❑ a ❑❑ a ❑ ❑ a'®❑❑ ❑ ❑❑ ❑ ❑ ❑❑❑ Cd ❑❑mod a' ErE0E I ❑ ❑❑ MIME ❑- ❑❑= ❑❑ ❑ T❑d ❑❑❑TICd ❑ Er ❑❑❑L I❑ fUI DDid ❑ MU HE ❑ I ❑❑❑❑d Ern ❑ Er MOH ED❑ Er ❑ ❑❑ ❑❑ ❑ EWE ❑U ❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed D-❑® ® D -d a- ® ❑❑ I Tao Laro -E a'= DIE ❑❑ ❑❑ 000 ❑❑ r ❑❑ ®❑ Er= r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I0003, VAR24I0002, and TTM23®❑❑❑
Project Location: 72094 Ginger Rogers Road (APN: 685T 002) Project DescriptionE The project proposes to subdivide 5.04 gross acres into nine (9) singlei LED I ii r❑I7d❑❑ I 'T❑with lots ranging in size from 16,122 square feet to 16,932 square feet. T Erns r❑❑L1❑HEE approval of a variance request to the Very Low Density Residential (RIL2) ❑ ME ❑❑ r❑❑❑©❑d El TEE ❑❑L❑❑❑ ❑ rE LI❑ ❑❑E= ❑❑r MEE Lrd iLr LIE ❑❑ ❑ ❑❑ I❑u ❑ ® rm❑ ❑EE❑IT❑❑d IUD ❑ ❑ ® L❑❑ ® ❑ ❑d = D LIEF ❑❑❑ a•❑llE Ill ❑ L❑❑ d ❑❑ ❑II❑ ❑❑❑❑ existing single ❑ u r❑I d❑❑ ❑❑f u _ ® ❑❑❑❑❑
LI I rdLEM ❑ I I I ❑R❑ § 21080.3.1, you have thirty (30) d 1_ IrEll [ID❑ r❑ ®❑ r❑❑❑❑ ❑ [TUTU ® ❑rIl ❑ Mir LI[ JUJU -0
Y❑❑ ❑ ❑❑ ❑ ❑r❑ TIELE-❑ ❑ EL ❑❑❑❑= a -❑m] [Er r❑❑❑❑
uEDEr d ©❑ ❑❑(760) 328 MEM ❑- ❑❑ ❑ DEED ❑ R ❑❑ELM ©❑❑❑❑ ❑ LI❑ ❑®❑ r❑LID-❑❑ ❑ E a•❑III ❑❑❑ ❑ ❑❑d ❑❑❑ ❑a' ❑❑ ®d®C❑d ❑❑❑ I❑ ❑®
DEEELo oMEi ER E DE❑❑R❑ME❑❑
En17 L T i ❑❑ ❑❑ _ ii ❑ • R Mr rmEI
M r (760) 3281 Ia ❑❑
884
❑❑
MTh
r
❑L ❑ DoiEi.
a r❑❑❑❑
CITY OF RAMC O MIRAGE
July 31, 2024
❑ EDE REM ❑ ❑❑d =TEE
❑ ❑❑❑❑❑m= M I=an[
P.O. Box 391820
Anza, CA 92539
00 E d Dim
I Jd❑ D®❑fir
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
DoE' ❑r®❑
d ID®❑ID]- M ED
❑❑❑ H. ❑❑R❑❑ ❑ M©❑❑❑ CCU LID❑ ❑❑❑❑Lm❑d- ❑❑❑M UM ❑❑W[llr❑Ei E❑ r❑❑❑ ❑❑E HE Act (CEQA), for C❑ aDDI I r D-❑® d ❑ r[fflLd ❑❑DIE ❑ ❑❑❑ ❑ ❑ ❑❑ D. ❑ ❑ a ®❑❑ ❑ ❑❑ ❑ ❑ ❑❑❑ Cd ❑❑[ DA Er Er❑❑❑ I ❑ ❑❑ ❑❑EM ❑- ❑❑=❑m HE ❑ [❑d ❑❑❑[Ed ❑ Er CEDED I❑ [UT nDid ❑ MD] D❑ ❑ I ❑❑❑❑d Er Ei Mr MOH ❑ E HE ❑❑ ❑ ❑J_II_I ❑El ❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed ❑'❑® ® ado- ® Ed ❑❑ I [EDE IlEr❑r❑ a"m❑ rmm ❑❑ ❑❑ ED ❑❑ r ❑❑ D E ❑ aro r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I0003, VAR24I0002, and TTM23=ED
Project Location: 72094 Ginger Rogers Road (APN: 685T m "002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) singlei LED I II _ r❑ADE I _ Uliwith lots ranging in size from 16,122 square feet to 16,932 square feet. D Erni r DID approval of a variance request to the Very Low Density Residential (RiL2) ❑ EUET HE r❑❑❑©❑d El TEE ❑❑TIEHE ❑Er❑ LE❑ ❑❑T= ❑Er MEE iLrd ilr DI ❑❑ ❑ ❑❑ I❑u ❑ [E rm ❑ITEDrmlm❑d ®❑ ❑ ❑ ® LILL ® ❑ ❑d D-❑❑❑ ❑❑❑ ❑ III]❑ d EE ❑®❑ ❑❑❑❑ existing single ❑ I U I r❑ d❑❑ ❑❑f I _ ® ❑❑❑❑❑
ED I rdu❑m ❑ I I I HRH § 21080.3.1, you have thirty (30) d 1_ fEE Em r❑ ®❑ r❑❑❑❑ ❑ [TUTU ® ❑rI I ❑ MD] ❑r
Y❑❑ ❑ HE ❑❑MD1 ❑ ❑r❑ = ❑ ❑®❑. ❑❑❑❑❑E:D❑ am [Er r❑❑❑❑
❑❑❑r d ©❑ ❑❑(760) 328 CHILD ❑- HE ❑ DEM ❑ R ❑❑HLLM ©❑❑❑❑ ❑ EE DUD r❑[ID'❑❑ DIE a-❑® ❑❑❑ E ❑❑d ❑❑❑ ❑Er ❑❑ ndDmC[Dd ❑❑❑ I❑ ❑®
r❑EE
I V H, -❑
IT ❑❑I T ❑ LED-
DEEELo oMEi ER E DE❑❑R❑ME❑❑
❑i 07 L T i ❑❑ ❑❑ _ ii ❑ • R Mr i m❑
M r T (760) 3281 I s❑❑
885
❑❑
lam®
r
LI
❑DE ❑ �.
D*' r❑❑❑❑
CITY OF RAMC O MIRAGE
C❑d IEEIE
❑❑M❑ ❑❑
July 31, 2024
❑ IEEE REM ❑ ❑❑d ❑❑❑ ❑❑❑
❑ ❑❑LIE ❑ E❑E❑d❑❑❑rlIDE
P.O. Box 391820
Anza, CA 92539
00 RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
D❑a` ❑r®❑
ELITE
❑❑ E
r❑d ❑❑
❑❑❑ ❑ MIRED= M©❑❑❑ [II E❑ Aid m❑❑emu❑Erm❑❑❑u HE❑ ❑ ❑nirEn E❑ r❑❑❑ ELIDE ❑❑ Act (CEQA), for EEO a'❑❑❑ r Er= d ❑ raid ❑❑ ME ❑ ❑❑❑ LIE ELI Cr LI ❑ ar®❑❑ ❑ ❑❑ ❑ ❑ ❑❑❑ ld ❑❑Ed D' ErEE uluiLI ❑❑ ❑❑ ❑ D- ❑❑L❑ETU ❑❑ ❑ Cr❑d ❑❑❑Ll❑d ❑ E DE r❑❑❑ i ❑ ul ❑I A ❑ Co no ❑ ❑❑❑D1 ErEI ❑ D- I❑❑❑ HE❑ D E ❑❑ ❑❑ ❑ ❑J_II_I ETD ❑ Ili❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed ❑-❑® Iliad D- El El EE f= IlElit❑D-❑ D- ❑ ECM ❑❑ ❑❑ El ❑❑ r ❑❑ ®❑ a-❑® Project Title: Tentative Tract Map No. 38636
Project No.: EA23I 0003, VAR24I 0002, and TTM23! , li
Project Location: 72094 Ginger Rogers Road (APN: 685 002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) single❑ LEE r❑I7d❑❑ I '7lwith lots ranging in size from 16,122 square feet to 16,932 square feet. ❑❑❑ ❑= r❑❑❑❑m=i approval of a variance request to the Very Low Density Residential (RJLC2) ❑ [EEl ❑❑ r❑❑❑©❑d ED TEE ❑❑IE❑❑ ❑D E HE DEEMED ❑D EI [E❑ ❑ ® C❑ ❑lla❑1T❑❑d LEE ❑ ❑ EDE LEE LE ❑ all= D FIDE ❑❑❑ ❑r= TO existing single ❑ Ii r❑
❑m=rd F I❑m ❑
I I I
d ❑❑ ELI FI ® ❑❑❑❑❑
Erd D- HE ❑❑
❑ LEE d CIE ❑
❑R❑ § 21080.3.1, you have thirty (30) d ❑m TEE C❑ r❑mml❑ r ❑❑❑❑ Tl❑ ❑ ITnn1Tl
CM❑rrI El 1lEr DMA -
❑ ❑❑
❑ ❑❑❑❑
Y❑❑ ❑ ❑❑ =D ❑ ❑r❑ ❑ I ❑. ❑❑❑❑❑=❑ a ETEDEI r❑❑❑❑ ❑❑1W❑ ❑❑ I ❑ LE❑❑❑r d ©❑ ❑❑(760) 328 ELIDED ❑- ❑❑ ❑ ❑ ❑ R ❑❑LIILM TEEM ❑ CI❑ EU ❑®❑ r❑® ❑❑ ❑ E Er❑® ❑❑❑ ❑ ❑D1 i❑❑❑ ❑D- ELI [Ed =Id ❑❑❑ I❑ ❑®
r=
I ❑ L, -❑
EMIT =ED.
DEEELEEMEE ER E DE❑❑R❑ME❑❑
❑i IT L T i ❑❑ ❑❑ _ ii ❑ • R Mr rmEI
Mr - (760) 3281 a ❑❑
886
DEEI
Il
r
❑ [E❑
Dr r❑❑❑❑
CITY OF RAMC O MIRAGE
July 31, 2024
❑ ❑❑❑❑❑ ❑ ❑❑d EEL ❑ ❑❑ Ed rim
JUDE ❑❑ziE ❑❑1 -❑❑R❑
P.O. Box 487
DOD =HEM MEDE
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
D0Er ❑ ❑na-❑❑R ❑
❑ ❑❑
EIEri❑m
❑❑❑ H. ❑❑R❑❑ ❑ M©❑❑❑ ri 1M n❑d ❑❑❑❑❑❑❑❑o- ❑❑❑M ❑❑i>Lu-❑r E❑ r❑❑❑ ❑❑M HE Act (CEQA), for Em I❑ EDE r Er= d ❑ r[ Ld ❑❑ ME ❑ ❑❑❑ ❑ ❑I ❑ ❑ D. ❑ ❑ o um ❑ ❑❑ ❑ ❑ ❑❑❑ b ❑❑rid Er Er❑❑❑ I ❑ ❑❑ ❑❑EM Er ❑❑= II HE ❑ [❑d ❑❑❑[❑d ❑ E ❑❑❑U I❑ rDi nDid ❑❑DDI r❑❑ ❑ I ❑❑❑❑dd'Ei ❑Er ❑❑❑H ED❑ ErE HE MEWED ❑El ❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed o-❑® ® ado- ED [d ❑❑ I Erg❑ Inir❑rrE a -m❑ ECM ❑❑ ❑❑ LID ❑❑ r ❑❑ ®❑ o-❑® r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I0003, VAR24I0002, and TTM23®❑❑❑
Project Location: 72094 Ginger Rogers Road (APN: 685T II "002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) singlei LED I II _ r❑rid❑❑ I _'❑lwith lots ranging in size from 16,122 square feet to 16,932 square feet.
Erni r❑❑r1❑DIE approval of a variance request to the Very Low Density Residential (RiL2) ❑ HE r❑❑❑©❑d CM TEE ❑❑rME ❑EPH Li❑ ❑❑MOE ❑❑r C❑= iLrd iir LIE ❑❑ ❑ ❑❑ I❑u ❑ ® rm❑ ❑EMrmlmLd ®❑ ❑ ❑ ® u❑❑ ® ❑ ❑d E= o-❑❑❑ ❑❑❑ Er= ® ❑ Imo❑ d ❑❑ 1=IIE ❑❑❑❑ existing single ❑ I U I r❑ d❑❑ ❑❑f I _ ® ❑❑❑❑❑
Li I rdLI= ❑ I I I ❑R❑ § 21080.3.1, you have thirty (30) d 1_ r❑❑ [ID❑ r❑ ®❑ r ❑❑❑❑ ❑ [TTTl❑ ® ❑ r l I DELT OHM Er
Y❑❑ ❑ HE ❑❑ED] ❑ o•❑ [EL-❑ ❑im. ❑❑❑= LrH[ [Er r❑❑❑❑
ET❑❑o' d ©❑ ❑❑(760) 328 ME❑❑ Er ❑❑ ❑ DEM ❑ R ❑❑HILLM ©❑❑❑❑ ❑ EE ❑®❑ r❑® ❑❑ ❑ E EPEE ❑❑❑ E ❑❑d ❑❑❑ ❑o` ❑❑ [EdumE❑d ❑❑❑ I❑ ❑i
DEEELo oMEi ER E DE❑❑R❑ME❑❑
En17 L T i ❑❑ ❑❑ _ ii ❑ • R Mr u❑
M r (760) 3281 i a LID
887
❑❑
ME]
r
Li
HEEL ❑ �.
o r❑❑❑❑
CITY OF RAMC O MIRAGE
July 31, 2024
❑ ❑❑❑❑❑ ❑ Lid EEL ❑ HE Ed I❑❑
J=0 ❑❑ ❑ ❑=E ❑ ❑r®❑
P.O. Box 487
❑ ❑❑ ww❑ ❑ ❑❑❑❑❑
r
EL Or:
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
DOD- ❑r®❑
r
® ❑r❑ it
DEE
r
❑❑❑ H. ❑❑R ❑❑ ❑ M ©❑❑❑ [II w❑ Hal ❑❑❑❑❑❑❑❑a- ❑❑❑M w❑ ❑ i Iwr ❑il E ❑ r ❑❑❑ ❑❑E ❑❑ Act (CEQA), for ®❑ a•❑❑❑ r a-❑® d ❑ NIA ❑❑®❑ ❑ ❑❑❑ ❑ a HE D. ❑ ❑ =DI ❑ ❑❑ ❑ ❑ ❑w Cd ❑❑ r Er Erom I ❑ ❑❑ MIME Er ❑❑= II w ❑ [❑d w❑[❑d ❑ D - =DU I❑ rU ❑ Eon r❑❑ ❑ I ❑❑❑D l D n ❑ D =DE EDE a' ❑ ❑❑ MEWED ❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed a-❑® ® Ltd a- ® [d ❑❑ I Irk❑ IUD loaD a -m❑ ED= ❑❑ ❑❑ ED ❑❑ r ❑❑ ®❑ aDlo r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I0003, VAR24I0002, and TTM23®❑❑❑
Project Location: 72094 Ginger Rogers Road (APN: 685T 002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) singlei w❑ I ii r❑rid❑❑ I '❑lwith lots ranging in size from 16,122 square feet to 16,932 square feet.
Erou r❑wHLE approval of a variance request to the Very Low Density Residential (R1L2) ❑ HE ❑❑ r❑❑❑©31 II TEE ❑❑EDE ❑Ero ❑❑w❑❑ ❑❑r HID= _rd iLr w ❑❑ ❑ ❑❑ ICE ❑ ® Erl ❑arm olal ®❑ 0E= w ® ❑ ❑d = JUDD ❑❑❑ Di= To ❑ III E d w ❑ DO ❑❑❑❑ existing single ❑ HH r❑ Co ❑❑f u _ ® ❑❑w❑
w I rdu❑w ❑ I I I ❑R❑ § 21080.3.1, you have thirty (30) d 1_ r❑❑ [ID❑ r❑ ®❑ r❑❑❑❑ I [TUTU ® ❑rI I ❑ ILI um Er
Y❑❑ ❑ ❑❑ ❑ ❑r❑ IIQD'❑ ❑ M ❑❑❑= ErH[ I D- r❑w❑
o IID❑❑❑r d ©❑ ❑❑(760) 328 MELD ❑- ❑❑ ❑ DEM ❑ R❑❑ELLLM ©❑❑❑❑ ❑w❑ DUI r❑ID-00 ❑ E a-❑® ❑❑❑ ❑ ❑❑d ❑❑❑ ❑or ❑❑ [Ed=ad ❑❑❑ I❑ ❑®
r❑no
❑❑ ❑
❑ ❑❑❑r =LIED-
DEEELEEMEi ER E DE❑❑R❑ME❑❑
❑i d I M EID ii ❑• R Mr rmEl
M r T (760) 328I Ia❑❑
888
❑❑
CHM
r
w
D no
o r❑❑❑❑
July 31, 2024
❑ Err ❑EM Er ❑❑ D ❑mr❑m ❑❑❑I
❑ I ❑❑= R d ❑❑ ELITE
P.O. Box 1160
Thermal, CA 92274
CITY OF RAMC O MIRAGE
CIA IEEE
El
❑❑ ❑
❑ ❑ ❑❑©❑ ❑❑ ED
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
D❑Er ❑❑CI1T❑
ED El
❑ ❑❑r❑ ❑❑ ❑❑ REAL
❑❑❑ ❑ ❑rR❑❑m❑ MrEEE [II E❑ [❑d EillEELLEEErMEEEIE LIE❑ ❑ ❑ uir❑I E❑ r❑❑❑ ELIDE ❑❑ Act (CEQA), for ELI IEr❑❑❑ r ❑ = d ❑ raid =7 ❑ ❑❑❑ CID ❑❑ Er ❑ =rum ❑ ❑❑ ❑ ❑ ❑❑❑ Cd ❑❑I__I ELEd Er ❑'❑❑L1Jului❑ ❑❑ ❑❑ ❑ d' ❑❑L❑ETU II ❑❑ ❑ Cr❑d ❑❑❑LI❑d ❑ Er DE r❑❑❑i ❑ E ❑IA ❑ UT W❑ ❑ ❑❑❑❑d❑'LEI ❑❑- I❑❑❑DI LEE ❑ E ❑❑ ❑❑❑❑J_II_I ETD ❑ E (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed ❑.= ® ❑'d ❑- ED El ❑❑ f= Imo -❑❑-El ❑- ❑ DEEM ❑❑ ❑❑ LE ❑❑ r ❑❑ ®❑ ❑ = Project Title: Tentative Tract Map No. 38636
Project No.: EA23i 0003, VAR24i 0002, and TTM23! ' li
Project Location: 72094 Ginger Rogers Road (APN: 685 Ii 002) Project DescriptionE The project proposes to subdivide 5.04 gross acres into nine (9) single❑ LEE r❑7d❑❑ I '7lwith lots ranging in size from 16,122 square feet to 16,932 square feet. ❑❑❑ ❑= r❑❑❑❑m=i approval of a variance request to the Very Low Density Residential (RJLC2) ❑ ❑❑ r❑❑❑©❑d [ EL =ME ❑Er❑ C❑ ❑❑E❑❑ ❑Er❑ DE❑
❑ ® LE❑ ❑IELUITT-Ind LIE ❑ El= EOE DE ❑ al= ❑ = ❑❑❑ ❑r❑lill existing single ❑ II r❑
❑co=rd I IEEE ❑
I I I
d ❑❑ LIE II _ ® ❑❑❑❑❑
Erd ❑- HE ❑❑
❑ LEE d❑❑❑
❑R❑ § 21080.3.1, you have thirty (30) d ❑EE r❑mml❑
r❑❑❑❑JJ❑J❑ flITFTT1
❑ rl l ❑ ILEIr En Er
❑ ❑❑
❑ ❑❑❑❑
Y❑❑ ❑ ❑❑ =El ❑ ❑r❑ ❑ I ❑. ❑❑❑❑❑=❑ o -=❑r r❑❑❑❑ ❑❑1W❑ HE I ❑ LLo❑❑❑r d ©❑ ❑❑(760) 328 ELIDED ❑- ❑❑ ❑ ❑ ❑ R ❑❑LIELM r❑❑❑❑❑ ❑ L❑ ELI ❑DE r❑IID LIE ❑ E a-❑® ❑❑❑ ❑ ❑❑d i❑❑❑ ❑D- ❑❑ [Ed=ad ❑❑❑ I❑ ❑®
r=
I ❑L, —❑
EMIT =ED.
DEEELEEMEE ER E DE❑❑R❑ME❑❑
En17 L T i ❑❑ ❑❑ _ ii ❑ • R Mr rmEI
Mr - (760) 3281 a ❑❑
889
Il
r
❑ LEE
Er r❑❑❑❑
CITY OF RAMC O MIRAGE
QDd I❑❑
July 31, 2024
EDT ❑ 1M Dr ❑❑ D ❑mr❑E ❑❑❑I
❑ ❑❑❑❑❑ ❑❑ ❑D ED ❑ ❑❑©❑D'
P.O. Box 1160
Thermal, CA 92274
III
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
D❑a ❑ ❑❑[r
]Er
❑❑❑ ❑ ❑rR❑❑m❑ MTEEE LIT LEE Hal m❑❑emu❑D-m❑❑❑L HE❑ ❑ LinirEn E❑ r❑❑❑ ❑❑E ❑❑ Act (CEQA), for E❑ a'❑❑❑ r Er= d ❑ raid ❑❑ ME ❑ ❑❑❑ ❑ ❑ ❑❑ Er ❑ ❑ an= ❑ ❑❑ ❑ ❑ ❑❑❑ Cd ❑❑I__I EE0d Er ErEE ❑ uJE ❑❑ ❑❑ ❑ a' ❑❑L❑ETU II ❑❑ ❑ [rEd ❑❑❑[❑d ❑ Er DI r❑❑❑i ❑ ul ❑IA ❑ LI [❑ ❑ ❑❑❑D1D'EDI ❑D- I❑❑❑[ ED❑ D E ❑❑ ❑❑❑❑J_II_I ETD ❑T❑❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed D-❑® ® D -d D- Du El EE fir= MEEt ❑ Er ❑ n❑❑❑ ❑❑ ❑❑ LI ❑❑ r ❑❑ ®❑Din Project Title: Tentative Tract Map No. 38636
Project No.: EA23I 0003, VAR24I 0002, and TTM23! , Ii
Project Location: 72094 Ginger Rogers Road (APN: 685 M 002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) single❑ LEE r❑I7d❑❑ I _ lllwith lots ranging in size from 16,122 square feet to 16,932 square feet. ❑❑❑ ❑= r❑❑❑❑ELE approval of a variance request to the Very Low Density Residential (RJLC2) ❑ [IDE ❑❑ r❑❑❑©D1 L TEE ❑❑C= ❑D E ED DEEMED ❑D E �❑
❑ ® DE ❑rionTTIEd LEE ❑ ❑ EEI LEE LI ❑ AL= D EIDO ❑❑❑ D ELE existing single ❑ II r❑
❑m=rd IEEE ❑
I I I
d ❑❑ ❑❑ I _ ® ❑❑❑❑❑
D -d D- HE ❑❑
❑LEE E
❑R❑ § 21080.3.1, you have thirty (30) d❑m r❑m[m
r❑❑❑❑1 Tl❑T❑ f 11TTfl
❑ rl I ❑ U' LE® D'
❑ ❑❑
❑ ❑❑❑❑
Y❑❑ ❑ ❑❑ ❑❑[Dil ❑ ❑r❑ M ❑ ❑ I ❑. ❑❑❑❑❑=❑ a ETEDI r❑❑❑❑ ❑❑1W❑ ❑❑ I ❑ LL❑❑❑r d ©❑ ❑❑(760) 328DEIDED ❑- ❑❑ ❑ ❑ ❑ R ❑❑EE VI TEEDE ❑ C❑ EU ❑ E r❑®-❑❑ ❑ E ErEE ❑❑❑ E ❑D1 ❑❑❑ ❑D- ❑❑ [DimEnd ❑❑❑ I❑ ❑®
DE❑EL❑❑MET ER E DE❑❑R❑ME❑❑
❑i [TrL _ii ❑• R Mr rmEI
M r T (760) 328I ❑❑
890
EmILE
l
r
❑ HE
Dr r❑❑❑❑
CITY OF RAMC O MIRAGE
July 31, 2024
EDT DEEM D- ❑❑ D ❑mr❑o ❑❑❑I
❑ I ❑❑Dr❑❑❑❑ E rr❑❑❑❑(III❑
P.O. Box 1160
Thermal, CA 92274
I II
EDd EEE
❑ rd Einar
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
D❑a ❑❑O-13-❑
ULrd ®❑IEr ❑ ❑ rr❑❑
❑❑❑ ❑ mR❑❑m❑ MYEEE LIT LEE End m❑L w1EErm❑❑❑u HE❑ ❑ ❑nirEn E❑ r❑❑❑ ❑❑I ❑❑ Act (CEQA), for EEL a DDE r a-❑® d ❑ rad ❑❑ ME ❑ ❑❑❑ ❑ ❑ ❑❑ E ❑ ❑ ar®❑❑ ❑ ❑❑ ❑ ❑ ❑❑❑ ld ❑❑I__I ELEd Er ErEE ❑1❑ LI ❑❑ ❑❑ ❑ a' ❑❑L❑ETU II ❑❑ ❑ [rEd ❑❑❑Ll❑d ❑ a' m r ❑❑❑i ❑ ul L_I�d ❑ LE W❑ ❑ ❑❑❑D1 D ED ❑ D- I❑❑❑ IL LEE D E ❑❑ ❑❑ ❑ ❑J_II_I ETD ❑ I (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed D-❑® ® D'd Er E El ❑❑ rte❑ Er ❑ DEEM ❑❑ ❑❑ El ❑❑ r ❑❑ ED D-❑® Project Title: Tentative Tract Map No. 38636
Project No.: EA23I 0003, VAR24I 0002, and TTM23!
Project Location: 72094 Ginger Rogers Road (APN: 685 0 002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) single❑ LEE r❑LTd❑❑ I '7lwith lots ranging in size from 16,122 square feet to 16,932 square feet. ❑❑❑ ❑ ni rEDEDELE approval of a variance request to the Very Low Density Residential (R1C2) ❑ [IDL ❑❑ r❑❑❑©D1 L TEE ❑❑{❑❑ ❑D D DEEMED ❑D D EH❑
❑ ® LIED ❑IDET❑TET-Ed LEE ❑ ❑ I E LEE I ❑ all= D EDE ❑❑❑ D'❑ill existing single ❑ Ii r❑
❑m=rd F IEEE ❑
I I I
d ❑❑ LIE FI _ ® ❑❑❑❑❑
D -d D- HE ❑❑
❑ COD d CIE ❑
❑R❑ § 21080.3.1, you have thirty (30) d ❑m TEL EIE❑ r❑mml❑ r❑❑❑❑TI❑ LI fl TFTTl
LEErrI El 1lEr E®D'
❑ ❑❑
❑ ❑❑❑❑
Y ❑❑ ❑ ❑❑ ❑❑Ullal ❑ ❑r❑ LEIEr❑ ❑ I ❑. ❑❑❑❑❑ =❑ a ETEDD r❑❑❑❑ ❑❑1W❑ HE I ❑ M❑❑r d ©❑ ❑❑(760) 328 [I❑❑❑ ❑- ❑❑ ❑ ❑ ❑ R ❑❑EE VI r❑❑❑❑ LIED EU EEL r❑LD-00 ❑ E a-❑® ❑❑❑ ❑ ❑D1 0❑❑ ❑D- ❑❑ L d=Id ❑❑❑ I❑ ❑®
r=
❑� ❑
EMIT =ED-
DE❑EL❑❑ME ER E DE❑❑R❑ME❑❑
❑i H❑ 1 • R Mr PMEI
❑❑I_ R Mr_ • (760) 3281 I a UT
�8 91
�LE
Il
r
❑ EM❑
Dr r❑❑❑❑
CITY OF RA IBC O MIRAGE
❑ Err DEEM Er mm D Mir DE ❑❑❑I DJ EDE
❑ I ❑Gary Resvaloso❑❑M MLD
P.O. Box 1160
Thermal, CA 92274
July 31, 2024
LI
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
DEEr ❑M M L D R LEDEI
El
❑❑❑ ❑ ID E R ❑❑m❑ M TTULE LE LID❑ LEL d ❑❑❑❑❑ ILIEr
❑❑❑E ED ❑ ❑Jl11Lr❑DD EMIMED ❑❑1E
EL
II
Act (CEQA), for =❑ ErDED r ❑= d❑ rL Ld =DE ❑❑❑ ❑❑ ❑❑❑r®❑ Er®00 ❑ ❑❑ ❑ ❑ ❑❑❑ d ❑❑ r Er ErEDO ®❑ ❑❑ ❑❑ ❑ ❑- DEEM= II _ ❑❑ ❑ Cr❑d ❑❑❑[❑d ❑ Er ❑❑❑LIIMEI III LA ❑ E= CU❑ ❑ ❑❑❑❑d ❑' ElI ❑ ❑' ❑❑❑ m DD❑ ❑' ❑ ❑❑ ❑❑ ❑ I ❑E DIM (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed '-❑(E ® Erd ❑- ❑- d ❑❑ TEL ❑❑-❑ ❑- E =ED ❑❑ ❑❑ cm ❑❑ r ❑❑ ®❑ ❑-❑® r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I 0003, VAR24I 0002, and TTM23! i i]
Project Location: 72094 Ginger Rogers Road (APN: 6851 EEM02) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) single❑ ®❑ I II _ Ir❑rTd❑❑IE IF liwith lots ranging in size from 16,122 square feet to 16,932 square feet. ❑❑❑ ❑ ❑� r❑❑❑❑ELE approval of a variance request to the Very Low Density Residential (R1C2) ❑ nu EL r❑❑❑rrLd Irk TEE ❑❑E= ❑ErD DD❑ ❑ErD ❑ 11 ❑d Er HE ❑❑ m❑ ❑❑ I� ❑ ® rT1❑ ❑ ❑fEEEd DD❑ E ❑ ® EEO ® ❑ lido= Er= ❑❑❑ ❑r❑LI ® LI ®❑ d ❑❑ ❑ u I❑ ❑❑❑❑ existing single ❑ II r❑ d❑❑ ❑❑I o ❑7 ❑❑❑m
DD ❑Dm d DECD ❑
❑R❑ § 21080.3.1, you have thirty (30) di E TDE r❑mfrrl❑❑❑D LI r❑❑❑❑ ❑
II
❑ ® ❑ UDE MED ❑r
Y ❑❑ ❑ ❑❑ ❑❑LE1 ❑ Er ❑ [rEr ❑ ❑ IIE ❑❑❑❑❑ C❑ Dr= D. r ❑❑❑❑ ❑I W❑I1W❑ ❑❑ ❑ LEU❑❑❑r d ©❑ ❑11(760) 328 EMEEI ❑- ❑❑ ❑ ❑ MD R ❑❑EEjA ©❑❑❑❑ ❑ LM❑
DUD r❑® ❑❑ ❑ E E-❑® ❑❑❑ ❑ ❑❑d ❑❑❑ ❑ET ❑❑ [1d=r❑d ❑❑❑ I❑ ❑®
r=
DEEELo oMEi ER E DE❑❑R❑ME❑❑
❑i17L Ti❑❑❑❑_ii❑•R Mr imL
M r T (760) 3281 I s❑❑
892
r
❑ LEE
Dr r❑❑❑❑
July 31, 2024
❑Err❑JIM Er ❑❑D❑❑ rDD❑❑❑
❑ I IV] D-❑ ❑ ❑ED -d ❑❑❑ ❑ EI
P.O. Box 1160
Thermal, CA 92274
CITY OF RAMC O MIRAGE
MICEEo
00 00 El El= EOM
RE: AB 52 Consultation for Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) in the City of Rancho Mirage, Riverside County, California (Assessor Parcel Number 685-080-002)
D❑D- ❑❑�'❑
I ❑❑ ❑ =ODE= ❑❑❑r =ad=
❑❑
❑❑❑ ❑ m EER❑❑m❑ MIMED [II IIID ❑ rid DIMMED- ❑❑❑Ir7 CID❑ ❑ ❑wLr❑❑) E❑❑mm EMI ❑❑ Act (CEQA), for LEE ErEEEL❑d Er d ❑ ru11Ld =EL ❑ ❑❑❑ ❑ ❑ ❑❑ D-®❑ ❑ a ❑❑ ❑ ❑❑ ❑ ❑ ❑❑❑ Cd EDEMA ❑' Er0ED ®❑ ❑❑ ❑❑ ❑ Er =MHO 0 _ ❑❑ ❑ Cr❑d ❑❑❑HEd ❑ Er ❑❑❑LMIE ul WA ❑ IIDE [❑ ❑ ❑❑❑❑d Er ll ❑ Er DEEM] C❑ E D ❑❑ ❑❑ ❑ I OLD ❑ ❑❑ (AB) 52, the City hereby extends an invitation to consult on the CEQA review of this proposed a -❑01 ® ad a- ❑1 d ❑❑ IEEE Euir ❑a-❑ Er ❑ ®❑❑❑ ❑❑ ❑❑ [ CO r ❑❑ ®❑ Er= r
Project Title: Tentative Tract Map No. 38636
Project No.: EA23I0003, VAR24I0002, and TTM23! Iii
Project Location: 72094 Ginger Rogers Road (APN: 6851 I❑❑L002) Project Description❑ The project proposes to subdivide 5.04 gross acres into nine (9) singleE CM I II Ir❑ITd❑❑IE Ii -rlwith lots ranging in size from 16,122 square feet to 16,932 square feet. ❑❑❑ ❑ ni r❑❑❑❑❑TI approval of a variance request to the Very Low Density Residential (RILLC2) ❑ ❑H ❑❑ r❑❑❑n❑d IE TEE MIMED ❑a-❑ [❑ ❑❑ Efl ❑a-❑ Erd Er HE ED ❑❑❑ ED IL ❑ TD f Tl❑ ❑ ❑ TEEd LEE ❑ ❑ ® EEO ® ❑ AO= Er E ❑❑❑ a'❑LE [II ❑ ®❑ d ❑❑ ❑ u I❑ ❑❑❑❑ existing single ❑ II r❑ d❑❑ ❑❑I o ID MITE
u❑ ❑❑ Erd ❑❑D] ❑
❑R❑ § 21080.3.1, you have thirty (30) di E TEE DUE r❑m[❑I❑❑DID r❑❑❑❑ ❑
II
❑®❑r❑ E[ErELa•
Y❑❑ ❑ ❑❑ ❑❑EM ❑ ❑r❑ EIS E ❑ 1 ❑ ❑❑❑❑= a-❑EDma- r❑❑❑❑ El ILU❑LED ❑❑ I ❑ ECU* dn❑ ❑[(760) 328 MAID ❑- ❑❑ ❑ ❑ ME R❑❑❑=IIEVITEEM ❑IED
EEL r❑® ❑❑ ❑]❑ a-❑® ❑❑❑ ❑ ❑❑d ❑❑❑ ❑a- ❑❑ [Ed= ad ❑❑❑ I❑ ❑ID
r❑EL
I❑IE ❑
❑ [LIT ❑ T❑❑a'
DEEELo oMEi ER E DE❑❑R❑ME❑❑
En17 L T i ❑❑ ❑❑ _ ii L• R Mr i u❑
Mr - (760) 3281 I a ❑❑
893
r
EEO
Er
❑ DIE
r❑❑❑❑
AGUA CALI INTE BAND CAHUILLA INDIANS
TRi8AL HISTOR]C PR'e5ERVATiON
RECEIVED
DEVELOPMENT SERVICES DEPT
08/22/2024 11:41:10 AM
August 22, 2024
[VIA EMAIL TO:[email protected]]
City of Rancho Mirage
Ms. Joy Tsai
69-825 Highway 111
Rancho Mirage, California 92270
Re: TTM23-0001
Dear Ms. Joy Tsai,
03-008-2024-008
The Agua Caliente Band of Cahuilla Indians (ACBCI) appreciates your efforts to include the Tribal Historic Preservation Office (THPO) in the TTM23-0001 project. The project area is not located within the boundaries of the ACBCI Reservation. However, it is within the Tribe's Traditional Use Area. For this reason, the ACBCI THPO requests the following:
*Formal government to government consultation under California Assembly Bi11 No. 52 (AB -52).
*A cultural resources inventory of the project area by a qualified archaeologist prior to any development activities in this area.
*Copies of any cultural resource documentation (report and site records) generated in connection with this project.
*A copy of the records search with associated survey reports and site records from the information center.
*The presence of an approved Agua Caliente Native American Cultural Resource Monitor(s) during any ground disturbing activities (including archaeological testing and surveys). Should buried cultural deposits be encountered, the Monitor may request that destructive construction halt and the Monitor shall notify a Qualified Archaeologist (Secretary of the Interior's Standards and Guidelines) to investigate and, if necessary, prepare a mitigation plan for submission to the State Historic Preservation Officer and the Agua Caliente Tribal Historic Preservation Office.
Again, the Agua Caliente appreciates your interest in our cultural heritage. If you have questions or require additional information, please call me at (760) 423-3485. You may also email me at [email protected].
Cordially,
54O1 DINRi•I SHORE DRIVE, PALM SFRINGS. CA 92254
T 750!599J5601t f 7601699:r VFWW.AGLIAGALJENT£-NSti GOV 894
AGUA CALIENTE BAND CAHUILLA INDIANS
IRERAL HISTORIC rPRESE VATiON
Xitlaly Madrigal
Cultural Resources Analyst
Tribal Historic Preservation Office
AGUA CALIENTE BAND
OF CAHUILLA INDIANS
5401 DINRE•I SHORE DRIVE, PALM SFRINGS. CA 92254
T 75Q!599J56OO f 7C01699;r,n,T .'.0.,W.AGLIAGALIENT£-NSti GOV 895
AGUA CALIENTE BAND CAHUILLA INDIANS
IRi8AL H'STOR]C PRE SERVATiON
September 11, 2024
[VIA EMAIL TO:[email protected]]
City of Rancho Mirage
Ms. Joy Tsai
69-825 Highway 111
Rancho Mirage, California 92270
Re: TTM23-0001
Dear Ms. Joy Tsai,
RECEIVED
DEVELOPMENT SERVICES DEPT
09/11/2024 4:43:21 PM 03-008-2024-008
The Agua Caliente Band of Cahuilla Indians (ACBCI) appreciates your efforts to include the Tribal Historic Preservation Office (THPO) in the TTM23-0001 project. The project area is not located within the boundaries of the ACBCI Reservation. However, it is within the Tribe's Traditional Use Area. For this reason, the ACBCI THPO requests the following:
*The presence of an approved Agua Caliente Native American Cultural Resource Monitor(s) during any ground disturbing activities (including archaeological testing and surveys). Should buried cultural deposits be encountered, the Monitor may request that destructive construction halt and the Monitor shall notify a Qualified Archaeologist (Secretary of the Interior's Standards and Guidelines) to investigate and, if necessary, prepare a mitigation plan for submission to the State Historic Preservation Officer and the Agua Caliente Tribal Historic Preservation Office. *The presence of an archaeologist that meets the Secretary of Interior's standards during any ground disturbing activities.
Again, the Agua Caliente appreciates your interest in our cultural heritage. If you have questions or require additional information, please call me at (760) 423-3485. You may also email me at [email protected].
Cordially,
Xitlaly Madrigal
Cultural Resources Analyst
Tribal Historic Preservation Office
AGUA CALIENTE BAND
OF CAHUILLA INDIANS
54O1 DINAH SHORE DRIVE., PALM SFRINGS. CA 92254
T 750!599J5601t f 7f01699;r,n,- v.AGLIAGALJENT£-NSti GOV 896
AUGUSTINE BAND OF CA UILLA INDIANS
84-001 AVENUE 54 COAC ELLA, CA 92236 I T: 760-398-4722 F: 760-369-7161 T IBAL C AI PE SON: A ANDA AUGUSTINE T IBAL T EASU E : ILLIA VANCE T IBAL COUNCIL E BE : ONNIE VANCE
RECEIVED
DEVELOPMENT SERVICES DEPT
08/06/2024 1:17:46 PM
Date: 08/06/2024
Dear: Joy Tsai
Senior Planner
SUBJECT: Tentative Tract Map No. 38636 (Planning Case Nos. EA23-0003, VAR24-0002, TTM23-0001) Thank you for the opportunity to offer input concerning the development of the above -identified project.
We appreciate your sensitivity to the cultural resources that may be impacted by your project and the importance of these cultural resources to the Native American peoples that have occupied the land surrounding the area of your project for thousands of years. Unfortunately, increased development and lack of sensitivity to cultural resources have resulted in many significant cultural resources being destroyed or substantially altered and impacted. Your invitation to consult on this project is greatly appreciated.
At this time, we are unaware of specific cultural resources that may be affected by the proposed project, however, in the event, you should discover any cultural resources during the development of this project please contact our office immediately for further evaluation.
Very truly yours,
Jacobia Kirksey, Tribal Operations Specialist
Augustine Band of Cahuilla Indians
897
R
L
R
RE
ER
E
❑� iI ELE❑ ❑R❑ ❑ _�� I MO11
❑ R 0 LM MEM ❑ EOM
ME ❑ HE mom- ❑ i❑❑I r
DE❑EL❑❑ME❑❑ ❑ER❑WIE❑ DE❑❑R❑ME❑❑
R❑❑� M IP❑m ❑ ❑ ❑❑❑❑❑
❑❑❑❑❑ m
RECEIVED
DEVELOPMENT SERVICES DEPT
08/13/2024 9:44:54 AM
MORONGO
BAND OF
MISSION
INDIANS
A SOVEREIGN NATION
Re: AB 52 Consultation for Tentative Tract Map No. 38636, City of Rancho Mirage, California ❑❑❑ MCr❑❑❑❑ ❑❑❑d ❑ IM
rmDdLW❑ LTh ❑ r
❑❑ rIJUILIVErE Cr Tod
IIDd �❑
❑❑❑
11 m
❑LJd ImDIW❑[M❑M0E❑rU❑
d Lir Ill ❑❑❑ a'❑m d ❑r❑
r
❑ ❑ I O M ❑M ❑❑
❑r❑
El m❑
rm❑❑❑ ❑ r❑m d
rl ❑ M ❑❑❑❑d ❑ i❑ ❑❑
11 ❑ ❑ a111111lEal ❑ [arm❑ OOOEn DIEIMMIrLDEDIEDd ELM
011E DTTLI1EJEM ELM LIE
HOD- EU
❑❑LELIIIUId ❑ ® CM Hal ❑ ❑ ❑
RE=
HIE
❑LrEalE ❑❑❑ ❑rEL-LJ
Tribal Historic Preservation Officer
Morongo Band of Mission Indians
DEMI EITTIFT WE CC
Er
MIO
11 THEE ❑❑E
00000 ❑ ❑❑ Lrr❑ RDA ❑ 0 u iLLI J❑❑ ❑ ❑❑❑❑❑ ❑ 11❑❑n❑❑❑?❑❑❑❑ n r ❑❑❑❑❑❑ :0000 ❑ ❑❑ 1110 ❑ ❑ rD'❑❑❑❑gym®❑ 898
❑ ❑❑❑❑d ® ❑ ❑ ❑❑❑ ❑
❑ ❑❑❑L EMT ❑
899
GENERAL MANAGER
Jim Barrett
COACH ELLA VALLEY WATER DISTRICT
Established in 1918 as a public agency
23 JUN 15 PM I:140
CLERK OF THE BOARD
Sylvia Bermudez
June 12, 2023
Joy Tsai, Senior Planner
Development Services Department
City of Rancho Mirage
69825 Highway 111
Rancho Mirage, CA 92270
Dear Ms. Tsai:
ASSISTANT GENERAL MANAGER
Robert Cheng
ASSISTANT GENERAL MANAGER
Dan Charlton
Subject: City of Rancho Mirage, Development Services Department, Request for Comments, Tentative Tract Map No. 38636 (EA23-003, TTM23-0001) This area is designated Zone X on Federal Flood Insurance rate maps, which are in effect at this time by the Federal Emergency Management Agency (FEMA).
Flood protection measures for local drainage shall comply with California Drainage Law and provide that stormwater flows are received onto and discharged from this property in a manner that is reasonably compatible with predevelopment conditions.
The City of Rancho Mirage (City) shall require mitigation measures to be incorporated into the development to prevent flooding of the site or downstream properties. These measures shall require 100 percent on -site retention of the incremental increase of runoff from the 100 -year storm. In addition, flood protection measures shall comply with California Drainage Law and provide that offsite stormwater flows are received onto the property and discharged from the property in a manner that is reasonably compatible with redevelopment conditions. Coachella Valley Water District (CVWD) requests review of said flood protection measures for compliance with California Drainage Law from a regional valley floor drainage perspective.
The project is located within the service area of CVWD for the provision of domestic water and sanitation service. The initiation of said service to this area will be subject to the satisfaction of terms and conditions established by CVWD and imposed from time to time, including but not limited to fees and charges, water conservation measures, etc.
CVWD may need additional facilities to provide for the orderly expansion of its domestic water and sanitation systems. These facilities may include pipelines, wells, reservoirs, booster pumping stations, lift stations, treatment plants and other facilities. The developer may be required to construct/install these facilities and then convey said facilities to CVWD along with the land and/or easements on which these facilities will be located. The terms and conditions for the planning, design, construction/installation, and conveyance of property interests shall be determined by CVWD pursuant to its rules and regulations as said requirements may be revised from time to time.
These sites shall be shown on the tract map as lots and/or easements to be deeded to CVWD for "CVWD public services" purposes.
Coachella Valley Water District
P.O. Box 1058 Coachella, CA 92236
Phone (760) 398-2651 Fax (760) 398-3711
900
www.cvwd.org
an Equal Opportunity Employer
Joy Tsai, Senior Planner
Development Services Department
City of Rancho Mirage
June 12, 2023