1. Introduction
A. Purpose
The purpose of the REU Wildfire Prevention and Improved Response Program is to establish a framework for the electric utility to conduct an effective, coordinated program to prevent catastrophic impacts to its infrastructure from wildfire. This program is a significant component of the Redding Electric Utility Wildfire Mitigation Plan required by SB901. The Program aims to prevent the start of wildfires from utility operations as well as provide faster response in the event of a wildfire either caused by or threatening its electric utility assets located in and around the City of Redding.
B. Goals
x Prevent electric utility-caused wildfire.
x Reduce the time for the Redding Fire Department to respond to, and engage in fires that threaten grid infrastructure and the other REU facilities. x Increase staffing to respond to emergencies reasonably likely to impact REU facilities.
x Increase available personnel for debris removal after extreme weather events. x Create community awareness for utility wildfire prevention.
C. Objectives
The Program’s primary objectives are to:
x Identify hazards that pose a potential threat of damaging wildfires that may reasonably be likely to affect REU facilities.
x Prioritize prevention efforts.
x Implement measures targeting fuel reduction to minimize the probability of utility-caused fires or wildfire impacts to REU facilities. x Coordinate with fuel reduction efforts of other department and agencies. x Increase community education, outreach, and dialog.
2. Strategy/Scope of Work
A. Redding Fire Department Initial Hazard Identification and Risk Assessment REU personnel will coordinate with Redding Fire and other City departments to identify and prioritize areas for risk reduction activities using the following resources:
x REU - CPUC Fire Threat Map
$33(1',;%
5(8 :,/'),5(35(9(17,21 $1'
,03529(' 5(63216( 352*5$0
3DJH1RI5
Packet Pg. 360 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Exhibit A
REU Wildfire Prevention and Improved Response Program
x CALFIRE Shasta Trinity Unit 2018 Strategic Fire Plan
x Redding Area Community Wildfire Protection Plans
x Shasta County Fire Safe Council – A collaborative composed of Western Shasta Resource Conservation District (WSRCD), federal and state land management agencies, and others and having a mission of being a framework for coordination, communication, and support to decrease catastrophic wildfire throughout Shasta County.
x Community Planning Assistance for Wildfire (CPAW) recommendations as approved by the Redding City Council
x City of Redding Hazard Mitigation Plan
x Redding Police Department
B. Redding Fire Department Personnel Assistance
Redding Fire Department to provide staff, equipment and materials for on-the-ground vegetation fuels reduction.
1. Wildfire Prevention – Apprentice Firefighter, 12 personnel a. Vegetation Management within easements as prioritized b. Soil sterilization
c. Fuel mitigation
d. Fuel breaks
e. Roadway breaks
f. Wildfire incident response
2. Incident Response – Firefighters, 6 personnel
a. Provide third person for rapid fire engagement upon arrival b. Two Engine Companies, three shifts
3. Supervision – Assistant Fire Marshal
a. Inspection and Tracking
x Project Tracking and Reporting Matrix
b. Reporting
x Redding Fire Monthly Reports to REU
x REU Director Annual Report to City Council
c. On-going Adaptive Management
x Update Hazard and Risk Assessment
x Revise Work Plans as Appropriate
C. Redding Community Services Personnel Assistance
$33(1',;%
5(8:,/'),5(35(9(17,21 $1'
,03529(' 5(63216( 352*5$0
3DJH2 RI 5
Packet Pg. 361 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Exhibit A
REU Wildfire Prevention and Improved Response Program
Redding Community Services to provide staff, equipment and materials for on-theground vegetation fuels reduction.
1. Wildfire Prevention – Public Works Maintenance Worker, 3 personnel a. Vegetation Management within easements as prioritized b. Soil sterilization
c. Fuel mitigation
d. Fuel breaks
e. Roadway breaks
$33(1',;%
5(8 :,/'),5(35(9(17,21 $1'
,03529(' 5(63216( 352*5$0
3DJH3RI5
Packet Pg. 362 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Exhibit A
REU Wildfire Prevention and Improved Response Program
C. Project Tracking and Reporting
Ref
#
Program Element Actions Performance Measure
1 Hazard identification,
Risk assessment and
Project Prioritization –
Assistant Fire Marshal and
Fire Chief
x Collaborate w/ REU
x Collaborate with
RPD/Parks/PW
x Other duties per the
REU Wildfire
Mitigation Plan
x Produce detailed
work plan in
collaboration with
REU
x Attend public
workshops or other
stakeholder meetings
2 Prevention – Apprentices
and 3 Public Works
Maintenance Workers
x Fuels reduction
x Soil sterilization
x Emergency debris
removal
x Other duties per the
REU Wildfire
Mitigation Plan
x Acres mitigated
x Circuit miles
mitigated
x Poles mitigated
x Fuel volume
mitigated
3 Rapid Incident Response
and Engagement –
Firefighters (also
Apprentices)
x Provide priority
response to wildfire or
utility fires
x Maintain heightened
alert/availability during
high threat periods
x Other duties per the
REU Wildfire
Mitigation Plan
x Wildfire and utility
fire incidents are
prioritized and
responded to quickly
4 Supervision – Assistant
Fire Marshal
x Attend monthly status
meetings w/ REU staff
x Inspect crew work
x Reporting
x Manage public
complaints for fuels
hazard on public and
private land
x Other duties per the
REU Wildfire
Mitigation Plan
x Attends meetings
x Detailed reports are
provided
demonstrating the
prevention
accomplishments
x Public complaints are
handled and
coordinated with
REU and RFD
$33(1',;%
5(8 :,/'),5(35(9(17,21 $1'
,03529(' 5(63216( 352*5$0
3DJH4RI5
Packet Pg. 363 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Exhibit B
REU Wildfire Prevention and Improved Response Program Cost Estimates
FY2019 FY2020 FY2021 FY2022 FY2023
6 Firefighters (1) $70,000 $565,000 $595,000 $615,000 $640,000 12 Apprentices (1) $70,000 $685,000 $735,000 $775,000 $820,000 1 Assistant Fire Marshal (1) $15,000 $155,000 $160,000 $160,000 $160,000 3 PW Maint. Worker (1) $25,000 $235,000 $240,000 $240,000 $240,000 PPE (2), Tools, and Supplies $85,000 $85,000 $25,000 $25,000 $25,000 Fleet $300,000 $10,000 $10,000 $10,000
TOTAL $265,000 $2,025,000 $1,765,000 $1,825,000 $1,895,000 1) Based on current salary schedules. Subject to change with salary schedule adjustments. 2) PPE = Personal Protective Equipment.
$33(1',;%
5(8:,/'),5(35(9(17,21 $1'
,03529(' 5(63216( 352*5$0
3DJH5RI 5
Packet Pg. 364 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX C
REU EMERGENCY
OPERATIONS
PROGRAM (EOP)
Packet Pg. 365 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) This Page Intentionally Left Blank
Packet Pg. 366 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
STANDARD OPERATING PROCEDURE
Title:
Emergency Operations Program
(Public Version)
SOP No: SOP-200
Ver. No: 1.0
Date: 12/03/2019
CONTENTS
1. Purpose ................................................................................................................................................. 2
2. Scope..................................................................................................................................................... 2
3. Emergency Operations.......................................................................................................................... 3
3.1. Pre-Planning.................................................................................................................................. 3
3.2. Initial Notification ......................................................................................................................... 3
3.3. Alert Levels.................................................................................................................................... 3
3.3.1. Level 1 – Possible Emergency ............................................................................................... 4
3.3.2. Level 2 – Very High Likelihood of an Emergency .................................................................. 5
3.3.3. Level 3 – Active Emergency................................................................................................... 6
3.3.4. Level 0 – Resume Normal Operating Conditions.................................................................. 6
4. REU Incident Command System ........................................................................................................... 7
4.1. Operations .................................................................................................................................... 9
4.2. Planning.......................................................................................... Error! Bookmark not defined.
4.3. Logistics.......................................................................................................................................10
4.4. Finance........................................................................................................................................11
5. Review and Training Requirements....................................................................................................11 Packet Pg. 367 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
STANDARD OPERATING PROCEDURE
Title:
Emergency Operations Program
(Public Version)
SOP No: SOP-200
Ver. No: 1.0
Date: 12/03/2019
1. Purpose
The Emergency Operations Program (EOP) is intended to provide structured guidance for REU staff to effectively manage emergency situations from an all-hazards approach. The all-hazards approach is based on the idea that while the causes and types of emergencies can vary widely with little predictability, the basic functions needed to respond are relatively similar from one event to the next.
Using a structured EOP based on the Incident Command System (ICS), this procedure provides instruction on the basic functions to be performed as well as providing decision-making processes to keep everyone that is involved on the same page with incident status, objectives, and resource requirements.
This EOP is intended to be both consistent with the ICS and to provide a scalable response from frontline REU employees to the Electric Director, and up to the City Manager, as well as the City Council. This EOP is also structured to follow the City of Redding (COR) Emergency Operations Plan and is a primary program element for REU’s Wildfire Mitigation Plan.
2. Scope
This procedure will focus on effectively managing emergencies that are either (1) impacting REU’s electrical facilities, equipment, staff, or (2) have a high potential of causing an emergency situation for REU in a similar fashion as above. The current operational risk environment requires REU to maintain an EOP with an ongoing planning and assessment lifecycle to incorporate best practices and lessons learned from past events.
For purposes of planning, the EOP will focus on these key functions for emergency management:
• Incident Command – Responsible for overall management of an incident at the REU Department Operations Center (DOC). The Incident Commander, Public Information Officer, Safety Officer, and the Liaison Officers will serve primary roles with the response units. • Operations – Actively seeks to preserve REU’s assets while restoring the system to normal conditions.
• Planning – Manages the planning process, tracks resources, develops status reports, and supports the production of the incident action plans.
• Logistics – Orders resources, anticipates supporting resources, and develops solutions to support Operations and Incident Command.
• Finance – Tracks costs, manages contracts, and administers the procurement process.
The scope of the EOP is concentrated from an REU centric approach with outreach on both a COR departmental and county wide geographic footprint. Geographic coordination may include (but is not limited to) other utilities, City, County, State and Federal agencies, California Office of Emergency Services and the Federal Emergency Management Agency. During Alert Level 3 conditions, REU will Packet Pg. 368 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
STANDARD OPERATING PROCEDURE
Title:
Emergency Operations Program
(Public Version)
SOP No: SOP-200
Ver. No: 1.0
Date: 12/03/2019
activate a Department Operations Center at the Redding Power Control Center to coordinate emergency situations as they may arise. The DOC will serve as the central point of command for REU staff, and will subordinate to any Emergency Operations Center activation by any local, state or federal authority.
3. Emergency Operations
The following section will provide the concept of emergency operations to be used as a general guide.
Not all emergencies will require the same level of action, nor will each emergency fall neatly within the lines of this EOP. By referencing this EOP and using these sections as an action guide REU should be positioned to manage emergency situations stemming from all-hazards.
3.1. Pre-Planning
If sufficient warning exists for the pre-planning of an emergency, an REU Leadership Team meeting will immediately be called to order by the Director or his designee to identify the hazard and begin the process of mobilization and activation of the EOP Alert process. Pre-planning, as discussed in Section
3.2, is to be considered an Alert 1 condition.
3.2. Initial Notification
Initial notification of an emergency can come from any source (internal or external). The primary sources of initial notification will typically be:
(1) An email alert to the REU Emergency Operations group email sent by the impacted Division Manager or Assistant Director, or
(2) The Power Control Center (PCC) Notice Generator (text alert).
Any REU staff member with information regarding a possible emergency shall immediately inform their manager or supervisor of the condition. The receiving manager or supervisor will immediately send an email to the REU Emergency Operations group email for distribution to all registered REU staff.
For emergency notifications originating from the activation of System Operating Procedure-24 REU Notification Plan (Attached), the Assistant Director of Utility Operations (or his designee) will immediately send an email to the REU Emergency Operations group.
The Director (or designee) will decide the appropriate Alert Level (see Section 3.3) after reviewing as much information regarding the emergency condition as possible. Example factors to be considered include the root cause, risk to staff and public, impact level (slight, moderate, high, severe), duration (short, medium, long, extensive) and mobilization requirements.
3.3. Alert Levels
Packet Pg. 369 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
STANDARD OPERATING PROCEDURE
Title:
Emergency Operations Program
(Public Version)
SOP No: SOP-200
Ver. No: 1.0
Date: 12/03/2019
Emergency Operations will be divided into 3 distinct categories of response:
(1) Alert 1 – Possible Emergency
(2) Alert 2 – Very High Likelihood of Emergency
(3) Alert 3 – Active emergency
(4) Alert 0 – Resume Normal Operating Conditions
For all Alert Levels, the following notification protocol shall be used to assume command of the emergency:
• The Incident Commander (IC) will assume command. The Director will typically be the IC, however, in the event the Director is unavailable for any reason the Assistant Directors will meet and confer on the appropriate IC for the emergency condition. • An evaluation and response assessment shall be prepared by the IC documenting the conditions that warrant issuance of an Emergency Operations Alert. • A statement will be sent via email alert from the Public Information Officer (PIO) to the all REU employee email group and to the REU Emergency Operations group using the following format:
o Subject: “NOTICE: REU Emergency Operations Alert Level _ Activated “ o Body Message: “This Alert Level # has been issued due to ____. Please refer to your EOP Guide to ensure you take the proper actions for this event. This Alert Level will be updated as the situation changes.”
o Supplemental SOP reference: “This Alert Level # will activate SOP-XX requiring special action as defined within the procedure.”
3.3.1. Level 1 – Possible Emergency
The following actions shall take place in the event of an Alert Level 1 activation:
• An emergency planning meeting shall be immediately assembled by the IC and include all Incident Command personnel as available.
o The IC will schedule the meeting including the conference bridge. o The meeting conference call number is 510-338-9438, Access Code 624 979 213 to ensure attendance no matter the location of staff.
o Incident planning shall assume the emergency will escalate to Alert Level 2. o Activation of any required PCC System Operating Procedures as necessary. o Assessment of Operations, Planning, Logistics, and Finance/Admin requirements. o Upon gathering input, the IC will draft an Incident Action Plan for dissemination by the PIO.
The Incident Action Plan will identify the priorities and objectives for emergency response in the event the possible emergency elevates to Level 2. Planning will include possible coordination, support and recovery requirements.
Packet Pg. 370 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
STANDARD OPERATING PROCEDURE
Title:
Emergency Operations Program
(Public Version)
SOP No: SOP-200
Ver. No: 1.0
Date: 12/03/2019
• The PIO will send an email alert to the REU Emergency Operations group including the Incident Action Plan and the next steps from the IC in the event of emergency escalation.
3.3.2. Level 2 – Very High Likelihood of an Emergency
The following actions shall take place in the event of an Alert Level 2 activation:
• An emergency planning meeting shall be immediately assembled by the IC and include all Incident Command personnel as available.
o The IC will hold the meeting (including conference call), call to order and work through the agenda.
o The meeting conference call number is 510-338-9438, Access Code 624 979 213 to ensure attendance no matter the location of staff.
o Next steps/planning activity shall assume the emergency will escalate to Alert Level 3 including activation of the Department Operations Center. o Activation of any required PCC System Operating Procedures as necessary. o Assessment of Operations, Communications, Planning, Logistics, and Finance/Admin requirements.
o Upon gathering input, the IC will draft an Incident Action Plan for dissemination by the PIO.
The Incident Action Plan will identify the priorities and objectives for emergency response in the event the possible emergency elevates to Level 3.
Planning will include possible coordination, support and recovery requirements. • The PIO will send an email alert to the REU Emergency Operations group including the following:
o The Incident Action Plan from the IC.
o The next steps from the IC in the event of emergency escalation. • The PIO will send an email to the all REU employee email group with the following message:
o An Emergency Mandatory Preparedness statement to all staff:
Subject: “Emergency Preparedness – Alert Level 2”
Body: “Due to the ___ situation an Alert Level 2 has been issued. The issuance of an Alert 3 is very likely if this situation escalates to an active emergency. All REU staff responsible for emergency operations shall be prepared to report to duty immediately if required. Please monitor your email and texts for updates to this situation”.
• The PIO shall post a message to REU customers on Facebook and Twitter. The message will indicate that REU’s Incident Response Team is assessing the situation and preparing for any emergency that may arise. Additional information will be posted as the situation changes.
Packet Pg. 371 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
STANDARD OPERATING PROCEDURE
Title:
Emergency Operations Program
(Public Version)
SOP No: SOP-200
Ver. No: 1.0
Date: 12/03/2019
3.3.3. Level 3 – Active Emergency
The following actions shall take place in the event of an Alert Level 3 activation:
• Activation of the REU Incident Command System (see Section 4.0) o Develop Incident Objectives including strategy, command emphasis/priorities and safety considerations.
o Incident Objectives will use the SMART principles of Specific, Measureable, Achievable, Realistic and Timely.
• Activation of the Department Operations Center (see Section 4) • Activation of the REU Communication Incident Response Guide (Attached) • The PIO will send an email to the REU Emergency Operations group with an Incident Update (attached) at intervals decided by the IC.
• The PIO will send an email to the all REU employee email group with the following message:
o An Emergency Condition statement to all staff:
Subject: “Active Emergency – Alert Level 3”
Body: “Due to the ___ emergency an Alert Level 3 has been issued. The Department Operations Center has been activated at the Redding Power Plant Conference Room A. All REU staff responsible for emergency operations shall report immediately to their respective locations and wait for further instruction from the REU Incident Command team. Please monitor your email and text for updates to this situation”.
• The PIO will post an initial message to REU customers on Facebook and Twitter to inform of the emergency situation. Additional messaging will be managed as outlined in the Communication Incident Response Guide.
3.3.4. Level 0 – Resume Normal Operating Routine
The following actions shall take place in the event of an Alert Level 0 activation:
• Demobilization of the Department Operations Center (if activated). • A debriefing meeting shall be scheduled by the IC including all relevant Incident Command Officers and Subject Matter Expert (SME) personnel, as available. • The outcome of the debriefing meeting is to develop two reports within 10 business days:
o (1) A public REU emergency incident report for the Redding City Council that includes the following basic elements:
Root Cause and Damage Assessment
Safety (i.e. injuries, loss of life)
Reliability (i.e. outage duration, Redding Power Plant operation, total customer counts, etc.)
Packet Pg. 372 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
STANDARD OPERATING PROCEDURE
Title:
Emergency Operations Program
(Public Version)
SOP No: SOP-200
Ver. No: 1.0
Date: 12/03/2019
Mutual Aid assistance.
Financial impact including efforts for cost recovery from outside agencies. Interaction with mutual aid, outside agencies and departments. Lessons learned.
o (2) An internal REU emergency response report to be used for record keeping and continual process improvement of the emergency operations plan process. Incorporate the REU emergency incident report.
Review of the IC structure and lessons learned.
Identification of EOP improvements and assignments with due dates for accountability.
• The PIO will send an email to the all REU employee email group with the following message:
o An Emergency Condition statement to all staff:
Subject: “Active Emergency – Alert Level 0”
Body: “The ____ emergency situation has ended. Alert Level 0 has been issued. All REU staff responsible for emergency operations shall resume normal duties. As part of REU’s Emergency Operations Plan, you may be asked for feedback regarding this emergency to assist the Leadership Team with the development of an emergency response report”.
• Post Alert Level 3 emergency activation, Management will conduct Critical Incident Debriefing with all employees impacted. Additionally, each Division will work with Personnel to provide Employee Assistance through the City of Redding Employee Assistance Program and other available resources.
4. Incident Command System (ICS) Structure
The commonly accepted National Incident Management System (NIMS), Incident Command System will be utilized by REU during emergency situations. The following roles, responsibilities and main focus will be assigned by position and may be delegated under an assumption of command approach. It is not feasible that every staff member will be available during an emergency to respond, therefore it is expected that REU staff will take delegation and command as appropriate.
Department Operations Center - In the event of an Alert Level 3 condition, a 24 hour per day Department Operations Center (DOC) will be mobilized at the Redding Power Plant Administration Building in Conference Room A. A Liaison Officer is responsible for the following items:
• Notification of activation to the City Manager’s Office (Emergency Services Director) • Coordination with any City, County or other agency Emergency Operations Center. • Preparation of RPP Conference Room A for DOC Activation. • Coordination with Logistics for necessary supplies.
• Coordination with Operations for necessary information technology.
Packet Pg. 373 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
STANDARD OPERATING PROCEDURE
Title:
Emergency Operations Program
(Public Version)
SOP No: SOP-200
Ver. No: 1.0
Date: 12/03/2019
• Coordination with RPP security for ingress/egress from the site. • Coordination with outside agencies for liaison participation at the DOC (i.e. police, fire, admin).
REU Leadership Roles & Responsibilities – In order for the ICS to be successful, each individual listed in Section 4.0 is responsible to understand their role and responsibility during an emergency situation.
This includes, but is not limited to items such as:
• Development, maintenance and administration of ICS Section Emergency Action Plans (i.e. Operations, Planning & Intelligence, Logistics, Finance) • Develop management and restoration objectives.
• Staff training and resource identification for optimal emergency response. • Maintaining current System Operating Procedures to ensure effective implementation during an emergency event.
It is not practical to assume this EOP will cover all areas of each work-unit and individual contributor effort during an emergency. This responsibility is held by the REU staff identified in this EOP. If you do not understand your role or responsibility or would like more clarification, please see your Manager or Assistant Director.
4.1. Incident Command Staff
Role Responsibility Focus
Incident Commander
(IC) or DOC Director
Overall management responsibility for the incident. Total incident prevention, protection, mitigation, response and recovery.
Public Information
Officer (PIO)
Communication of incident to internal and external
stakeholders using the REU Communication Incident
Response Guide
Multiple communication channels, clear and
concise messaging, continual updates and
information streaming.
Safety Officer (SO) Protection of employees and customers from hazards, injury and loss of life.
Maintain safe operational practices, stand-down
unsafe conditions, preserve safe work environment
during emergency conditions.
Liaison Officer(s) (LO) Coordination with internal divisions and external agencies/stakeholders for continuity, efficiency and
maximum effectiveness.
Customer focus, internal division administration,
situational dependent agencies, anticipate
outreach.
The following positions are identified as serving ICS roles during an emergency. Delegation is the responsibility of the staff member currently serving in this position. It is the responsibility of each staff member to assign an alternate or replacement prior to the event and notify the Logistics Section Chief.
If delegation is not possible, the IC will delegate as needed.
Packet Pg. 374 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
STANDARD OPERATING PROCEDURE
Title:
Emergency Operations Program
(Public Version)
SOP No: SOP-200
Ver. No: 1.0
Date: 12/03/2019
Incident Command Officer Identification
Name REU Role(s) Office
Phone
Cell
Phone
Office
Email
ICS Role Alert Level 3
Location
Director Incident Commander or
DOC Director
DOC
Program SupervisorAdminPublic Information Officer DOC
Safety/Enviro. Coordinator Safety Officer DOC
Assist. Director - Resources Liaison Officer DOC or Field Assist. Director –
Enterprise Services
Liaison Officer DOC or Field
Assist. Director –
Operations
Liaison Officer DOC or Field
4.2. Operations Section
The Operations section is comprised of various workgroups that are directly responsible for the success of maintaining REU system assets during an emergency. This mostly includes field operations and the prioritization of restoration efforts along with management of power supply resources.
Role Responsibility Focus
Power Control Center -
Dispatch
Distribution system load preservation
and restoration.
Safety first, adherence to System Operating Procedures, coordination with DOC and PIO for timely updates.
Power Control Center –
Energy Management
Real-time energy supply reliability. Coordination with WAPA/BANC entities, anticipation of future power supply disruptions or situational changes.
Line & Substation Distribution system asset
preservation and restoration
including use of Mutual Aid.
Safety first, adherence to System Operating Procedures, coordination with Dispatch and DOC personnel, Mutual Aid management.
Customer Services –
Field Services
Metering asset preservation and
restoration.
Safety first, coordination with DOC and Liaisons, supplemental crew support for field operations.
Customer Services – Call
Center, Walk-in, Back
Office
Emergency customer service and
business continuity during
emergencies.
Receive and deliver customer information, coordinate messaging with PIO and DOC Liaison, provide for normal business
operations during emergency situations for non-affected customers.
Power Plant Provide reliable power supply as
directed by Energy Management
Anticipate and remedy abnormal operating conditions,
communication with Energy Management and DOC.
Packet Pg. 375 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
STANDARD OPERATING PROCEDURE
Title:
Emergency Operations Program
(Public Version)
SOP No: SOP-200
Ver. No: 1.0
Date: 12/03/2019
Operational Technology
Group
Maintain REU OTE systems Remedy OTE issues, coordinate with DOC for priority, and coordinate with City of Redding IT for troubleshooting and problem solving.
The individual positions identified as serving lead Operations roles during an emergency are listed in SOP-200.1 (Operations Section Unit) for further reference. Delegation is the responsibility of the staff member currently serving in this position. If delegation is not possible, the IC will delegate as needed.
4.3. Planning and Intelligence Section
The Planning & Intelligence section is comprised of various workgroups that are directly responsible for the success of supporting REU work units during an emergency. The Planning and Intelligence units include Engineering, GIS/Mapping support, Planning/Drafting, and Compliance efforts.
Role Responsibility Focus
Engineering Review of System Capability and support of Dispatch operations. System configurations, loading capabilities, system studies
GIS/Mapping Administer GIS projects and programs and prepare a variety of equipment, operational, statistical, and administrative reports related to GIS functions and services as appropriate.
Analyze and interpret GIS generated data to
facilitate workflow needs with internal and
external customers.
Planning/Drafting Preparation of electric transmission and distribution (T&D) designs required to harden or upgrade the electric utility system and to serve new development.
Coordinate the development of T&D
standards, T&D construction and
reconstruction projects, and work order
systems.
Compliance Ensure compliance process is adhered to during emergency. Monitor for compliance violations, track and report compliance status to ERC.
The individual positions identified as serving lead Planning and Intelligence roles during an emergency are listed in SOP-200.2 (Planning & Intelligence Unit) for further reference. Delegation is the responsibility of the staff member currently serving in this position. If delegation is not possible, the IC will delegate as needed.
Packet Pg. 376 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
STANDARD OPERATING PROCEDURE
Title:
Emergency Operations Program
(Public Version)
SOP No: SOP-200
Ver. No: 1.0
Date: 12/03/2019
4.4. Logistics Section
The Logistics section is comprised of various workgroups that are directly responsible for the success of supporting REU during an emergency. This mostly includes staff available for direct emergency support.
Role Responsibility Focus
Resources
(Avtech staff)
Provide support for travel, purchasing, fleet
vehicles, food/water, and customer specific
engagement.
Ensure business continuity during emergency.
Coordinate with DOC Liaison for priority, adhere to purchasing standards, and relieve Operations units from logistical duties.
Executive
Assistants
Emergency meeting scheduling, minutes and
document drafting support, purchasing and REU
staff support.
Coordinate with IC for meeting requirements. Ensure REU staff are aware of meetings and conference calls. Coordinate with other Logistics units for response and support.
The individual positions identified as serving lead Logistics roles during an emergency are listed in SOP200.3 (Logistics Unit) for further reference. Delegation is the responsibility of the staff member currently serving in this position. If delegation is not possible, the IC will delegate as needed.
4.5. Finance
The Finance section is comprised of the normal REU Finance division that is directly responsible for the financial management of REU’s funds during an emergency. This includes all staff available for direct financial support.
Role Responsibility Focus
REU
Finance
Track costs and expenses, labor time, equipment time, cost estimates, develop emergency contracts/PO’s, coordinate with City Finance for procurement and purchasing standards, disseminate an Emergency Purchasing procedure to Operations, Planning and Logistics leads.
Adhere to City (or external agency) purchase
requirements, manage costs and project
expenses, prepare for future City Council
action as necessary.
The individual positions identified as serving lead Logistics roles during an emergency are listed in SOP200.4 (Finance Unit) for further reference. Delegation is the responsibility of the staff member currently serving in this position. If delegation is not possible, the IC will delegate as needed.
5. Supporting Documentation
The following supporting documents are included by reference. These documents can be updated separate from the Review requirement in Section 6.0. At a minimum, this supporting documentation will be reviewed and updated as necessary as stated in the review requirement in Section 6.0.
Packet Pg. 377 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
STANDARD OPERATING PROCEDURE
Title:
Emergency Operations Program
(Public Version)
SOP No: SOP-200
Ver. No: 1.0
Date: 12/03/2019
TITLE INTENT OWNER LOCATION
REU Incident
Response
Communication
Guide
Main source for
REU
communication
process during
emergency
incident.
Public
Information
Officer
SOP-200.1
Operations Unit
Supplemental info
specific to
Operations unit
Operations
Section Chief
SOP-200.2
Planning &
Intelligence Unit
Supplemental info
specific to
Planning &
Intelligence unit
P&I Section
Chief
SOP-200.3
Logistics Unit
Supplemental info
specific to
Logistics unit
Logistics
Section Chief
SOP-200.4
Finance Unit
Supplemental info
specific to Finance
unit
Finance Section
Chief
ICS Forms Documentation
during incidents.
FEMA https://training.fema.gov/icsresource/icsforms.aspx
6. Update, Review and Training Requirements
This procedure can be updated at any time to ensure relevancy and completeness for the Emergency Operations Program. This SOP shall be reviewed at least twice per year during normal summer and winter preparation training meetings. All training attendance records shall be retained for a minimum period of 5 years.
Packet Pg. 378 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
STANDARD OPERATING PROCEDURE
Title:
Emergency Operations Program
(Public Version)
SOP No: SOP-200
Ver. No: 1.0
Date: 12/03/2019
Packet Pg. 379 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX D
REU 10-YEAR
CAPITAL
IMPROVEMENT
PROGRAM
Packet Pg. 380 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) This Page Intentionally Left Blank
Packet Pg. 381 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) REU Distribution 10-Year Capital Improvement Program
1 REU Wildfire Mitigation Plan May 2023
Objective
The objective of the 10-Year Capital Improvement Program is to enhance the distribution system in two ways:
• Selectively replace the components used on the electrical distribution system to reduce the probability that the system itself will initiate a fire. • Harden the electrical distribution system to better survive a fire.
These objectives will be achieved using the following five strategies:
• Enhanced inspections and tracking of assets;
• System hardening of key subsystems;
• Improved situational awareness;
• System improvements providing better operational practices; • The addition of switching to provide precision de-energization.
System Improvements Description
The suggested system improvements are proposed to be as described below:
1) Field Verify / T2 / T3 Boundary: The present CPUC maps defining the Tier 1, 2, and 3 boundaries were created as statewide maps that lack the detail necessary to accurately define the operation of the utility assets within the City of Redding (COR). An assessment will be performed to provide clarity of what the actual fire hazards are at critical locations on the REU distribution system. Mitigation shall be performed for certain circuits to allow the recloser operation to be reinstated and removed from the list shown in Attachment 2.
2) Perform necessary tree trimming and removal in priority areas. 3) Reconfigure specific Circuits to feed only Tier 1.
4) Install non-arcing arrestors, fuses, and squirrel guards and add covered wire jumpers. 5) Create 30-foot sterilized perimeter for T2 and T3 substations. 6) Apply fire retardant to poles for T2 and T3.
7) Install fault indicators in order to locate issues faster. 8) Install Mesh Network to retrieve fault and outage data. 9) Connect Line Fault Indicator data to SCADA.
10) Provide secondary water source to Power Plant.
11) Install additional 12KV switches at T1 boundary.
12) Install fast reclosers/sectionalizers at T1 boundary. 13) Convert overhead to underground for critical COR water plants. 14) Improve existing and add additional access roads to critical sections of the distribution system.
15) Replace existing 115KV poles with steel pole in T2 and T3 areas. 16) Convert overhead to underground where it is deemed cost effective. 17) Convert Keswick River Crossing from wood to steel.
System Improvements Timeline
Priority will be given to the improvements that can be deployed the earliest, with the largest estimated return in meeting the Program objectives. Improvements which require larger efforts such as city-wide studies and design consultant efforts will be implemented as they are completed.
Packet Pg. 382 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) REU Distribution 10-Year Capital Improvement Program
2 REU Wildfire Mitigation Plan May 2023
Calendar Year 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 WMP Year # 1 2 3 4 5 6 7 8 9 10
Item # Fiscal Year 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 1 Field verify and revise Tier 2 and Tier 3
boundary Complete
2 Perform necessary tree trimming and
vegetation removal in priority areas Complete
3 Reconfigure specific distribution circuits to
feed only Tier 1 areas Complete
4 Install non-arcing arrestors, fuses, and
bird/squirrel guards, covered jumpers in T2/T3 X X X X X 5 Create 30-foot sterilized perimeter for
substations in T2 and T3 areas Complete
6 Apply fire retardant or fire wrap to wood poles
for T2 and T3 areas X X X X X X
7 Install fault indicators for faster location of
distribution outages X X X
8 Install mesh network to retrieve outage data
from Remote Metering Project Complete
9 Connect line fault indicator data to SCADA Complete
10 Integrate remote meter data and fault indicator
data with Outage Management System X X X
11 Provide secondary water source to Power Plant Complete 12 Install additional 12KV switches at T1
boundary Complete
13 Install fast reclosers/sectionalizers at T1
boundary X X X
14 Convert overhead to underground for critical
COR water facilities X X
15 Improve existing access roads and add
additional to critical sections of the system X X X X X 16 Replace 115KV wood poles with Steel or
Laminate in T2 and T3 areas X X X X X X X X
17 Convert overhead circuits to underground
where practical in T2 and T3 areas. X X X X X X
18 Convert Keswick River crossing from wood to
steel X X
19 Upgrade 12KV Breaker Protect Relay to better
coordinate with circuit fusing X X X X
Revised December 2022
Packet Pg. 383 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 REU Distribution 10-Year Capital Improvement Program
3 REU Wildfire Mitigation Plan May 2023
Budgetary Cost Estimate
All improvement items will first be evaluated for their cost/benefit in meeting the objectives of the Program, as well as compared to the overall budget available prior to implementation. Items identified for installation in the early years are easily justified as an available technology that is quickly becoming industry standard or best practice.
The initial budgetary costs have either been completed or have been rolled into REU’s expanded 10-Year Capital Improvement Plan (CIP). A summary portion of the 10-Year CIP is below to provide additional detail of the projected level of effort required to implement these remaining wildfire mitigation tasks, as well as additional distribution improvement tasks.
This table shows the estimated cost of each project over the 10-Year Capital Improvement Plan along with associated hours estimated to complete the project.
Project Estimated
Total Cost
Estimated
Individual
Labor
Estimated
Engineering/SCADA
Hours
Fire Mitigation
Circuit Hardening $1,994,000 5840 0
Install switches at T1 boundary/Feeder
Reconfiguration to T1 only $378,000 540 100
Install Fast reclosers/sectionalizers at
T1 boundary $206,000 234 60
Overhead
1-Phase Cutout Mounted Recloser
Deployment $200,500 135 50
Aging Asset - Pole Replacements $14,360,000 46,500 0
Switch Replacement Program $1,370,000 4275 0
LED Streetlight Conversion $4,050,000 1500 0
Underground
Aging Asset - Underground Cable
Replacements $24,600,000 67,500 0
Strategic Undergrounding $6,500,000 12,600 0
Substation
Fiber Optic Backbone $4,500,000 10,800 1,000
High Impedance Fault Detection $1,745,000 0 1360
Substation Security Improvements $850,000 1080 40
Substation Aging Asset Replacement
(Budget Reserve Only) $5,300,000 0 0
Substation Fence Upgrade (Canby) $110,000 0 0
Packet Pg. 384 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) REU Distribution 10-Year Capital Improvement Program
4 REU Wildfire Mitigation Plan May 2023
Operational Efficiency and Reliability Improvements
Faulted Circuit Indicator continuation
(200
OH/300 UG)
$490,000 540 N/A
Line Sensors Deployment (SEL
FLT/FLR) $150,000 90 60
Line Capacity Upgrades and Volt-Var
Optimization $1,053,500 8,775 0
ADMS and Device Deployment for
ADMS $5,855,500 1,510 1,500
RMI to AMI Conversion $2,428,000 1,125 0
BESS Installation Pilot $280,000 0 80
Other
Electric System Model (Windmil)
Completion* $139,500 0 700
Engineering Studies - Fuse
Coordination,
DER Impact, Switching Contingency*
$93,000 0 465
Update Standards* $96,000 0 465
Fault Location Isolation and Service
Restoration (FLISR) Study* $40,000 0 200
Facilities Field Verification - Phase
Identification $575,000 2,475 0
Totals $77,364,000 165,519 6,095
Packet Pg. 385 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX E
REU TECHNOLGY
SOLUTIONS
PROGRAM
Packet Pg. 386 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) This Page Intentionally Left Blank
Packet Pg. 387 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX E
TECHNOLOGY &
SOLUTIONS PROGRAM
Overview
Through the application of technology, REU will be able to more effectively protect and reduce threats to the electric utility infrastructure and the customers who rely upon it. The following technologies will greatly enhance REU’s ability to minimize sources of ignition, manage vegetation within the City’s electric grid, enhance productivity of utility staff, harden systems, more effectively protect and notify the public if an issue arises, as well as shorten the response and recovery time in the event REU equipment contributes to starting a wildfire.
Technology also helps to heighten situational awareness and enhances public safety response time, allowing first responders to react in an appropriate and effective manner before, during and after a wildfire. The Program provides funding to the Redding Police Department (RPD) and the City Information Technology (IT) Department for services rendered to help prevent REU caused wildfires and protect REU facilities from the threat of wildfires through aerial surveys of REU’s overhead electric lines, video monitoring of facilities, a common communication platform, and a GPS based vehicle tracking platform. The memorandums of understanding (MOUs) are attached.
Specifically, this program provides for an estimated total of forty (40) cameras; a common radio platform, including base stations, handhelds and vehicle mounted radios for REU personnel as well as radio equipment for Redding Police and Fire command Staff; and Automatic Vehicle Location (AVL) tracking devices on all Electric Utility vehicles and necessary upgrades for first responder vehicles. The common communication and GPS vehicle tracking platforms will be expandable and be designed to allow easy adoption by other City Departments at a small incremental cost.
Cameras for Utility Operations, Fire Detection and Mitigation Situational awareness is instrumental in combating fires in and around our community. Camera technology is a vital element in the early detection and intrusion of wildland fires into the City of Redding. In addition, cameras provide critical information related to any REU equipment that may be a contributory cause to a fire. The installation of cameras in areas surrounding REU’s critical infrastructure will greatly enhance first responder’s ability to identify, locate, and mitigate fire threats.
Live feed cameras mounted throughout REU’s service territory will assist with the early detection of fires caused by the electric system. Strategically placed cameras in the proximity of REU’s transmission lines, especially in the Tier 2 and Tier 3 fire areas, will also aid in risk assessments during designated Red Flag warning days or a fire weather event in which an Emergency Operations Center is activated. Early assessment and detection allows REU to quickly react and prevent the system from inflicting harm on the surrounding areas.
Mobile cameras will also be used in a variety of preventative ways through the use of Unmanned Aerial Vehicles (UAVs). This includes the identification of potential right-of-way hazards as well as the location and isolation of hot spots in REU distribution lines using Forward Looking Infrared Radar (FLIR) technologies.
Packet Pg. 388 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX E
TECHNOLOGY &
SOLUTIONS PROGRAM
In the event a fire is seen or reported, fixed cameras and UAVs can quickly discover and identify hot spots in the area, help determine the potential for the fire to spread, and give first responders specific intelligence related to scaling fire resources up or down appropriately. In addition, strategically placed fixed cameras assist first responders in determining the best evacuation routes through enhanced situational awareness. Fixed and UAV cameras allow firefighters and first responders to more effectively manage firefighting operations. Speakers mounted on UAVs greatly enhance the ability to communicate with first responders in the danger area and with citizen evacuations.
HD video streaming from the UAVs to the Department Operation Center (DOC) or command staff on computers/cell phones will allow those in control of fire operations to see a live, realtime video feed of the fire. This will streamline firefighting capabilities and enable command center personnel to make quick decisions based on real-time information, rather than using information that has been relayed through multiple parties or having to wait until first responders are in place. Command center personnel will be able to see the direction a fire is spreading, providing the ability to move resources to the most effective positions.
Implementation of an artificial intelligence overwatch camera and software system will assist in the early detection of fires. Fire watch systems are specifically manufactured for early wildfire detection and can be calibrated for any region, vegetation, and type of weather. This technology includes a triple optical sensing unit, control and detection software that performs selfdiagnostics, and smoke detection. While this technology is recommended to be used with a detection radius of ten (10) miles, it has proven itself capable of locating smoke plumes up to forty (40) miles away during clear weather days. When smoke is detected by the system it alerts users so that first responders can react quickly and efficiently before flames reach the tree tops.
Early detection of fire arising proximate to REU facilities using the system allows first responders to launch a direct attack using minimal resources and results in both physical and monetary savings to REU.
Fire caused by REU facilities or threatening REU facilities can rapidly becoming a city-wide threat to the inhabitants of the City. City-wide issues and concern can begin long before the cause of a fire is known due to lack of certainty. By determining the cause, or origin, of a fire quickly, we can not only save life and properties, we can mitigate the risk of uncertainty. In this regard, early detection of fire caused by REU facilities or threatening REU facilities protects the City as a whole.
Aerial Imagery
The city-wide aerial orthophotography is a core data set for the GIS Division. Aerial imagery or orthophotography provides the picture from which many GIS data layers are created and maintained. For example, our parcels, roads, water system, wastewater system, and storm drain system GIS layers are all created and maintained using high-resolution orthophotography. Also, high-resolution imagery is a powerful visual tool when represented on maps and exhibits. It is important that the imagery be kept up-to-date. The most recent aerial imagery was flown prior to the Carr fire, and is therefore not a true representation of our community’s current landscape.
Packet Pg. 389 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX E
TECHNOLOGY &
SOLUTIONS PROGRAM
New imagery would allow fire crews to be able to identify current overgrown areas proximate to REU facilities, as well as those areas at a higher risk of fires. Ensuring the imagery is kept up to date on a more frequent basis will play a critical role in ensuring fire crews are able to maintain a clearer/safer landscape around REU facilities as vegetation regrows. Newer imagery would allow for accurate GIS data, which in turn, would further enhance the City’s Fire Department in their fire mitigation efforts to enhance wildfire buffers around REU facilities. This imagery will be performed every two years.
City-Wide Communications Platform
Immediate and reliable communication is vital during an emergency such as a wildfire, or major storm event. The current City of Redding radio systems have reached their end of useful life and are requiring replacement. RPD is currently in the process of upgrading their existing radio system and REU is proposing to expand upon this project to include additional features that will meet Redding Electric Utility’s need to monitor and react to wildfire threat to REU facilities or to protect the City from wildfire threat posed by REU facilities while also creating a unified platform across City Departments. By implementing a unified stationary and mobile communication platform, City of Redding personnel will have the ability to communicate across Departments during emergency situations quickly and efficiently. This platform will provide immediate connection to all parties, free of cross-channel interference, allowing each Department to work simultaneously and in support of one another. In addition to purchasing the communications platform, REU will provide radios for Electric Utility employees and Redding Police and Fire command staff to ensure reliable communication between first responders and REU to ensure the preservation of life and property. *Initial costs associated with the communications platform will be paid by REU. The Redding Police Department will be responsible for a partial repayment for handheld and vehicle radios through an interdepartmental lease process.
This radio system will allow first responders to immediately report downed electric lines to REU or report a fire that has been started due to a downed line. This will lead to faster response times and better fire management. Direct radio communication between Redding Fire Department personnel to Police personnel will provide safe direction to high risk areas during evacuations as well as allow first responders to request specific power shutoffs from REU’s DOC during an emergency.
Automatic Vehicle Location (AVL)
AVL will assist each Department with the identification and tracking of first responder and emergency vehicles. During a wildfire event, it is critical for the Department Operations Center (DOC) to be able to determine the location of each vehicle so that resources can be dispatched and/or redirected to REU facilities in the most effective manner, and to identify where a vehicle is located so assistance may be provided if an employee is in danger. AVL aids in the identification of employee location during emergencies and allows dispatchers to warn personnel who are in the vicinity of an at-risk area.
Packet Pg. 390 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX E
TECHNOLOGY &
SOLUTIONS PROGRAM
AVL will allow REU to track the progress of employees while patrolling equipment during a Red Flag outage. By doing so, REU can ensure that outages are handled quickly and efficiently, and that employees are not at risk. If an emergency situation is identified, AVL will provide REU with the ability to quickly report a vehicle’s location and allow dispatchers to send first responders directly to the vehicle and employee(s).
REU Wildfire Technology Matrix
REU Technology Strategies Matrix
Cameras for
Detection &
Mitigation
Aerial
Imagery
Citywide
Communications
Platform
Automatic
Vehicle Location
(AVL)
Vegetation
Management
x x
Enhanced
Inspections
x x x
Situational
Awareness
x x x x
Operational
Practices
x x x
System Hardening x x x x
Public Safety &
Notification
x x x
Reclosing &
Deenergization
x x x
Wildfire Response
& Recovery
x x x
Cameras for
Detection &
Mitigation
Aerial
Imagery
Citywide
Communications
Platform
Automatic
Vehicle Location
(AVL)
Wildfire
Prevention &
Improved
Response
x x x x
Technology
Solutions
x x x x
Distribution 10-
year Capital
Improvements
x x x
REU Emergency
Operations
x x x x
Packet Pg. 391 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX E
TECHNOLOGY &
SOLUTIONS PROGRAM
Budgetary Cost Estimate
Item # Item Description Total Cost
1 Cameras for Utility Operation, Fire Detection and
Mitigation
$2,989,000
2 Aerial Imagery $50,000
3 City-Wide Communication Platform $8,820,000
4 Automatic Vehicle Location (AVL) $60,000
Total $11,919,000
Packet Pg. 392 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX E
TECHNOLOGY &
SOLUTIONS PROGRAM
Exhibit A
REU Technology Solutions Program
1. Introduction
A. Purpose
The purpose of the Redding Electric Utility (REU) Technology Solutions Program is to establish a framework for the electric utility to conduct an effective, coordinated program to prevent catastrophic impacts to its infrastructure from wildfire. This program is a significant component of the Redding Electric Utility Wildfire Mitigation Plan required by SB901. The Program aims to prevent the start of wildfires from utility operations as well as provide faster response in the event of a wildfire either caused by or threatening its electric utility assets located in and around the City of Redding.
B. Goals
• Prevent electric utility-caused wildfires.
• Reduce the time for the Redding Police Department (RPD) to report, respond to, and engage in emergencies that threaten grid infrastructure and other REU facilities. • Increase technology use and reliability in order to promote interdepartmental coordination.
C. Objectives
The Program's primary objectives are to:
• Identify hazards that pose a potential threat of damaging wildfires that may reasonably be likely to affect REU facilities.
• Prioritize interdepartmental communication through radios. • Quickly identify possible fire risks and choreograph proper response routes. • Decrease recovery time after a fire occurs.
• Increase accuracy of fire investigation results.
• Utilize cameras to identify possible threats that are naturally occurring or human caused. • Track progress and location of employees to ensure the safety and effectiveness of positioning.
2. Strategy/Scope of Work
A. REU will coordinate with RPD to fund the following technology:
• Unmanned Aerial Vehicle (UAV)
• Cameras for Surveillance, Fire Detection, and Investigation Packet Pg. 393 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX E
TECHNOLOGY &
SOLUTIONS PROGRAM
Exhibit A
REU Technology Solutions Program
B. Redding Police Department to procure technology deemed necessary as well as provide staff and requisite training to operate the following technology:
• UAV units: RPD will assist REU in the aerial patrol of overhead lines using UAVs equipped with Forward Looking Infrared Radar (FLIR). This service will be provided on an as needed basis but at a minimum of once yearly as required by California Public Utilities Commission General Order 165. This process aids in ensuring the stability of REU’s overhead lines and assists in the location and mitigation of potential fire hazard risks.
• UAV units: RPD will assist RFD in the monitoring of fires using UAVs equipped with FLIR technology. This service will be provided on an as needed basis. • Cameras for Surveillance, Fire Detection, and Investigation: RPD will assist REU in the detection as well as investigation of fire origination and cause of ignition through the use of fixed and/or mobile cameras.
• Radio System: RPD will report all Utility related fire hazards to REU personnel through the unified communication platform.
Packet Pg. 394 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX E
TECHNOLOGY &
SOLUTIONS PROGRAM
Exhibit B
REU Technology Solutions Program
Cost Estimates
1. UAVs • Four (4) UAVs equipped with FLIR capabilities • Two (2) UAVs without FLIR capabilities • One (1) Insight RT System with Road Case • Yearly Inspection of Power Lines o Total cost is not to exceed $230,000
2. Cameras • Forty (40) fixed cameras • Intelligence Led Policing (ILP) • 3D Laser Scanner and Equipment • Added equipment and warranties o Total cost is not to exceed $959,000
Packet Pg. 395 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX E
TECHNOLOGY &
SOLUTIONS PROGRAM
Exhibit A
REU Technology Solutions Program
1. Introduction
A. Purpose
The purpose of the Redding Electric Utility (REU) Technology Solutions Program is to establish a framework for the electric utility to conduct an effective, coordinated program to prevent catastrophic impacts to its infrastructure from wildfire. This program is a significant component of the Redding Electric Utility Wildfire Mitigation Plan required by SB901. The Program aims to prevent the start of wildfires from utility operations as well as provide faster response in the event of a wildfire either caused by or threatening its electric utility assets located in and around the City of Redding.
B. Goals
• Prevent electric utility-caused wildfires.
• Reduce the time for first responders to report, respond to, and engage in emergencies that threaten grid infrastructure and other REU facilities. • Increase technology use and reliability in order to promote interdepartmental coordination.
C. Objectives
The Program's primary objectives are to:
• Identify hazards that pose a potential threat of damaging wildfires that may reasonably be likely to affect REU facilities.
• Prioritize interdepartmental communication through radios. • Quickly identify possible fire risks and choreograph proper response routes. • Decrease recovery time after a fire occurs.
• Increase accuracy of fire investigation results.
• Utilize cameras to identify possible threats that are naturally occurring or human caused. • Track progress and location of employees to ensure the safety and effectiveness of positioning.
2. Strategy/Scope of Work
A. REU will coordinate with COR Information Technology (IT) Department to fund the purchase and maintenance of the following technology:
• Fixed and Mobile Communication Platform
• Automatic Vehicle Location (AVL)
• IQ FireWatch
• Aerial Imagery
Packet Pg. 396 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX E
TECHNOLOGY &
SOLUTIONS PROGRAM
Exhibit A
REU Technology Solutions Program
B. City of Redding IT Department to procure and implement technology deemed necessary as well as provide staff and requisite training to operate the following technology:
• Radio System: The City IT Department will design, purchase, and implement the infrastructure and equipment necessary to create a stable radio system based within City Limits. This system will have the capacity to expand to all City Divisions that express a need for radio use.
• Radios: The City IT Department will determine the appropriate design and functionality of radios and order the amount necessary to outfit REU, RPD, and RFD. • AVL: The City IT Department will design, implement, and maintain the necessary programs and technology to expand AVL services to all vehicles in REU. • IQ FireWatch: The City IT Department will purchase, implement, and maintain the technology and equipment required to utilize the IQ FireWatch system. • Aerial Imagery: The City IT Department will aid in the city-wide aerial orthophotography every two (2) years and assist in its inclusion in the City’s GIS maps.
Packet Pg. 397 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX E
TECHNOLOGY &
SOLUTIONS PROGRAM
Exhibit B
REU Technology Solutions Program
Cost Estimates
1. Fixed and Mobile Communication Platform • Master Site Controller • Two RF sites • Backhaul Network • SHASCOM Console site • Subscribers (Radios) for RFD, RPD, REU and the EOC • External Services • Radio Management • Key Management Facilities • Technical Training • Mobile Command Center Unit o Total cost is not to exceed $8,820,000
2. Automatic Vehicle Location (AVL) • AVL coverage for all vehicles in REU o Total cost is not to exceed $60,000
3. IQ FireWatch
• Triple Optical sensing unit
• Pan/tilt with weather housing
• Switchbox and cabling to head unit
• Control unit with remote control and Watchdog function • Ethernet switch
• Power supply with urge protection and EMI filter
• Control and detection software including self-diagnostics • Detection units
• Construction of additional viewing towers
• Integration/Connection to Public Services/Emergency Responders (Fire and Forestry Service)
• Training and calibration labor
• Permitting fees
o Total cost is not to exceed $1,800,000
4. Aerial Imagery
• Provides orthophotography to the GIS division for mapping • High-resolution imagery
o Total cost is not to exceed $50,000 every two (2) years Packet Pg. 398 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX E
TECHNOLOGY &
SOLUTIONS PROGRAM
Ongoing costs for all technologies of approximately $120,000 will be primarily funded by the City's IT Department. Staff anticipates this to be partially offset by reduced maintenance due to the replacement of aging infrastructure.
TECHNOLOGY TOTAL COST GENERAL REU COST FUND COST
Unmanned Aerial Vehicles
UAV (Matrice 210) $ 175,000 $ 175,000
UAV (Mavic 2 Dual) $ 15,000 $ 15,000
Annual ongoing maintenance and training $ 20,000 $ 20,000 Insight RT System w/Road Case $ 15,000 $ 15,000
Yearly Power Line Inspection $ 5,000 $ 5,000
*RPD will provide assitance to REU and RFD $ 230,000 $ 230,000 Cameras
Fixed Cameras (40) with Live Feed $ 800,000 $ 800,000
Laser Scanner $ 85,500 $ 85,500
Scanner Equipment and Warranties $ 27,500 $ 27,500
Fuji File Mirrorless Camera Forensic Bundle $ 5,000 $ 5,000 Ultralight ALS Complete Turbo Kit $ 6,000 $ 6,000
Intelligence Led Policing $ 35,000 $ 35,000
IQ FireWatch $ 1,800,000 $ 1,800,000
*For use by REU, RFD, and RPD $ 2,759,000 $ 2,759,000
Aerial Imagery
Orthophotography every two years $ 50,000 $ 50,000
Fixed and Mobile Communication Platform
Master Site Controller
− Two RF Sites
− IP Based Backhaul Network
− SHASCOM Console Site
− Subscribers (Radios) for RFD, RPD, REU, and EOC
− External Services
− Radio Management
− Key Management Facilities
− Technical Training
− Contingency Funding
− Backup Subcribers for Major Events(20)
Mobile Command Center Unit
− Maintenance Performed by IT
*Subscribers provided to REU, RFD, and RPD
$ 8,220,000 $ 3,407,000 $ 4,813,000
$ 550,000 $ 550,000
$ 50,000 $ 50,000
$ 8,820,000 $ 3,407,000 $ 5,413,000
Automatic Vehicle Location (AVL)
Additional module to ESRI Contract $ 7,000 $ 7,000
Professional Services for Installation $ 20,000 $ 20,000 Computer Hardware/Storage $ 23,000 $ 23,000
Contingency Funding $ 10,000 $ 10,000
*Installed on REU, RFD, and RPD vehicles $ 60,000 $ 60,000 TOTALS $ 11,919,000 $ 3,407,000 $ 8,512,000
Packet Pg. 399 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX F
SYSTEM OPERATING
PROCEDURE SOP-35
OPERATING DURING
HIGH FIRE THREAT
CONDITIONS
(PUBLIC VERSION)
Packet Pg. 400 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) This Page Intentionally Left Blank
Packet Pg. 401 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Procedure No:
SOP-35
Version:
5 Approval Date:
8/23/2021 System Operating
Procedure
(Public Version)
Effective Date:
08/27/2021
Reviewed On:
08/27/2021
Document Owner:
Electric Manager - Engineering & Operations
REDDING ELECTRIC UTILITY
Power Operations Division
System Operating Procedure SOP-35
Operating During High Fire Threat Conditions
Reviewed By:
Senior System Operator - Transmission & Distribution,
Assistant Director - Utility Operations
Approved By: Electric Manager - Engineering & Operations Packet Pg. 402 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) System Operating Procedure SOP-35 Operating During High Fire Threat Conditions
Operating During High Fire Threat Conditions
Version 5
- 1 -
TABLE OF CONTENTS
1. PURPOSE...................................................................................................................................................... 2
2. APPLICABILITY ......................................................................................................................................... 2
3. DEFINITIONS .............................................................................................................................................. 2
4. COMMUNICATION .................................................................................................................................... 3
5. NATIONAL WEATHER SERVICE ALERT ISSUANCES..................................................................... 3
6. RECLOSERS................................................................................................................................................. 3
7. ALLOWABLE WORK DESIGNATIONS ................................................................................................. 4
8. SOP-200 ALERT LEVEL............................................................................................................................. 4
9. REVIEW AND UPDATING REQUIREMENTS....................................................................................... 5
10. TRAINING .................................................................................................................................................... 5
11. REVISION HISTORY.................................................................................................................................. 5
12. ATTACHMENTS: .................................................................................................................................... 6-8 Packet Pg. 403 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) System Operating Procedure SOP-35
Operating During High Fire Threat Conditions Version 5
- 2 -
1. Purpose
The purpose of this procedure is to formalize and provide applicable REU employees with the information necessary to understand which procedures will be applied and what work may be accomplished during high fire threat conditions. These periods would include Fire Weather Watches and Red Flag Warnings as issued by the National Weather Service.
2. Applicability
All REU Electric Utility System Operators-Transmission & Distribution (EUSO-T&D), Electric Utility Assistant System Operators-Transmission & Distribution (EUASO-T&D), Electric Manager-Line, Electric Program Supervisors-Line, Electric Manager-Generation, Electric Program Supervisors-Generation, and all Qualified Electrical Workers.
3. Definitions
3.1. Fire Weather Watch (FWW): A FWW is typically issued to alert fire and land management agencies to the possibility that RFW conditions may generally exist within the next 12 to 48 hours in advance of the expected conditions, but can be issued up to 72 hours in advance if the NWS agency is reasonably confident. That watch then remains in effect until it expires, is canceled, or upgraded to a RFW.
3.2. Red Flag Warning (RFW): A RFW means warm temperatures, very low humidity, and stronger winds are expected to combine to produce an increased risk of fire danger. This informs affected parties and agencies that conditions are ideal for wildland fire combustion, and rapid spread. To the public, a RFW means high fire danger with increased probability of a quickly spreading vegetation fire in the area generally within the next 24 hours.
3.3. Automatic Circuit Reclosers (ACR): ACR’s, or reclosers, in electric power distribution, are a class of switchgear which is designed for use on overhead electricity distribution networks to detect and interrupt momentary faults. If a line or circuit trips because of an event, the automatic recloser opens, deenergizing the line or circuit. After a preset time, the device closes again, which reenergizes the line or circuit. If the condition that caused the event is still present, the device opens again. This sequence is repeated a predetermined number of times until the condition has cleared or the device locks out.
3.4. Tier 1: Tier 1of the CPUC Fire-Threat Map delineates the designation of the U.S. Forest Service and CALFIRE joint map of Tree Mortality High Hazard Zones
3.5. Tier 2: Tier 2 of the CPUC Fire-Threat Map delineates where there is an elevated risk for utility-associated wildfires
3.6. Tier 3: Tier 3 of the CPUC Fire-Threat Map delineates where there is an extreme risk for utility associated wildfires
3.7. Incident Command Structure (ICS): The ICS will be utilized by REU during emergency situations to delineate and delegate the various roles, responsibilities and main focus by employee position under an assumption of command approach.
Packet Pg. 404 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) System Operating Procedure SOP-35
Operating During High Fire Threat Conditions Version 5
- 3 -
3.8. Power Control Center (PCC): The PCC is the location of the E/U Distribution System Operators and shall serve as REU’s Department Operations Center during an Alert Level 3 event.
4. Communication
4.1.All communication associated with Red Flag Warning events shall be in accordance with SOP-024 “REU Notification Plan”
4.2.Refer to SOP-24 for the Notice Generator Contact List for RFW events.
5. National Weather Service Alert Issuances
5.1. When the NWS issues a weather alert, a corresponding email is sent to the PCC’s email inbox ([email protected]). The EUSO-T&D on duty shall then note the type, time, and details of the issuance in the Distribution Log and then notify the Fire Weather Group (Ref SOP-24 “REU Notification Plan”) of the alert via that group’s selection in the PCC Notice Generator. Should the NWS issuance later be cancelled or modified in any way of time, date, or severity, this shall also be noted in the Distribution Log and a subsequent notice shall be sent to the Fire Weather Group.
6. Reclosers
6.1. During periods in which the NWS has issued a RFW or at REU Management Discretion, the EUSO-T&D shall disable (cut-out) the reclosers (ACRs) for the circuits designated on the Tier 2/Tier 3 Affected Circuit List (see Attachment 2). The reclosers shall be cut-out at a time commensurate with the start time of the RFW issuance and shall be re-enable (cut-in) at the termination of the RFW event.
6.1.1.The EUSO-T&D shall disable the reclosers via SCADA by the following steps: The SCADA has a page option (list it) that contains the 12kV and 115kV circuits that need to have reclosing disabled when a RFW is issued. To access the page, use the “Red Flag” shortcut at the bottom of the “Circuits” page. When using the group command you use the “Execute” command, regardless if you are disabling or enabling reclosers; the command script toggles the position of all reclosers on that page. Once pressed, the Execute command turns on the script to complete the command which takes 60 to 90 seconds to execute. Please be patient, it should start about 10 seconds after the top of the minute.
6.1.2.If you place a control inhibit tag on a recloser that is on the list, the script will not operate that recloser. It is Distribution’s practice to place control inhibit tags on reclosers where a non-test has been issued. If you are switching, be aware of the potential impacts of transitioning out of RFW issuance procedure, you may need to add additional control inhibit tags to prevent unintended operations
6.1.3.The EUSO-T&D shall re-enable the reclosers, via SCADA, following the termination/cancellation of a RFW issuance by repeating the steps above, including reviewing the circuit reclosers for any applicable control inhibit tags.
Packet Pg. 405 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) System Operating Procedure SOP-35
Operating During High Fire Threat Conditions Version 5
- 4 -
6.1.4.Refer to SOP-21 Circuit Switching Guidelines for the general steps in Operating Under a Red Flag Warning.
7. Allowable Work Designations
7.1. Allowable work to be accomplished during a FWW or RFW event is dependent upon the Tier level (Tiers 1-3) the affected circuit, device, or equipment resides in. Each work type, Tier level, NWS issuance, and affected work group has allowable work that they may or may not perform during these events along with any type of additional restriction that may be placed upon that work as designated by the Allowable Work Matrix for NWS Alerts (Attachment 3).
7.2. The Redding Electric Scheduled Power Outage form (Attachment 4) allows for work in Tier 2 and Tier 3 areas, while under RFW issuances, provided that an exception is written by the requestor of the outage and the exception is signed (pre-approved) by either the Assistant Director of Utility Operations or the Line Manager for safety (this is work that can then be done regardless of weather conditions). An example of this might be a pole replacement in a Tier 3 zone but which is in an area, like a parking lot, that is completely void of vegetation and not subject to fire threat conditions.
8. SOP-200 Alert Level
8.1.Whenever an RFW event is announced for the Redding area, an SOP-200 Alert Level 1 shall be implemented by the REU Public Information Officer.
8.2. During an RFW where reclosers have been disabled the restoration process is usually more involved and takes considerably longer to identify the cause. Under the following conditions, a qualified representative from Operations management, typically the Line Manager or Supervisors, shall travel to the field and assist the assessment & restoration process by coordinating Troublemen, crew needs, and communication updates. This management representative shall be designated as the on-scene Incident Commander.
8.2.1. Full circuit outage, after business hours, where recloser logic has been disabled.
8.2.2. Multiple partial circuit outages, after business hours, where one troubleman is on duty.
8.2.3. A fire has been identified near the city limits threatening REU infrastructure.
8.2.4. A major Power Plant Outage has occurred.
8.2.5. A Restraint has been placed on the REU transmission system.
8.3. Upon assessment and confirmation of events listed in Section 7.2 (or similar events) the REU Public Information Officer shall issue an SOP-200 Alert Level 2 or 3 as determined by the Incident Commander.
8.3.1. The Incident Commander shall brief the REU Emergency Operations Team and request additional assistance as required.
8.3.2. Should the media be at the scene, the Incident Commander should brief the media when an official statement is requested from REU.
Packet Pg. 406 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) System Operating Procedure SOP-35
Operating During High Fire Threat Conditions Version 5
- 5 -
9. Review and Updating Requirements
This procedure will be reviewed annually and may be updated, as necessary, at any time.
10. Training
10.1. This document shall be reviewed at least annually by all applicable REU personnel.
10.2. This subject will be covered in annual Emergency Operation Procedural training and will be referenced in both the REU Wildfire Mitigation Plan as well as SOP-200 Emergency Operations Program.
11. Revision History
Removed for Public Version.
Packet Pg. 407 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) System Operating Procedure SOP-35
Operating During High Fire Threat Conditions Version 5
- 6 -
12. Attachments:
ATTACHMENT 1: TIER 2/TIER 3 AFFECTED CIRCUIT LIST
During Red Flag Warnings or at REU Management Discretion, disable reclosing capabilities on the following 12kV circuits. Also disable the 115kV reclosers on lines that cross Tier 2 & 3 areas where the below 12kV reclosers are cut-out.
Substation Tier 2 or 3 Circuit
Airport 1301
Airport 1302
Airport 1303
Airport 2701
Airport 2702
Airport 2703
Airport 2704
Beltline 1101
Beltline 1102
Beltline 1103
Beltline 1104
College View 2901
College View 2902
East Redding 1501
East Redding 1504
Eureka Way 1001
Eureka Way 1002
Eureka Way 1003
Eureka Way 1004
Moore 1602
Moore 2603
Moore 2604
Oregon 2201
Sulphur Creek 2301
Sulphur Creek 2302
Sulphur Creek 2303
Sulphur Creek 2304
Sulphur Creek 2801
Sulphur Creek 2802
Sulphur Creek 2803
Sulphur Creek 2804
Texas Springs 1401
Texas Springs 1402
Texas Springs 1403
Texas Springs 1404
Waldon 2102
Waldon 2104
Revision Date 08/23/2021
Packet Pg. 408 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) System Operating Procedure SOP-35
Operating During High Fire Threat Conditions Version 5
- 7 -
ATTACHMENT 2: ALLOWABLE WORK MATRIX FOR NWS ALERTS
NWS Issued Conditions
Crew Work To Be Accomplished in Tiers I, 2, 3 Normal
Fire Weather
Watch (FWW)
Red Flag
Warning (RFW) Comment
Corresponding Alert Level (Per SOP-200) 0 1 2 1
Fire crew clearing work T2/T3 Yes Yes w/ water tank Modified 2 Emergency repair work T1 Yes Yes Yes w/ water tank
Emergency repair work T2/T3 Yes Yes w/ water tank Yes w/ water tank Normal scheduled work T1 Yes Yes Yes w/ water tank
Normal scheduled work (Energized OH) T2/T3 Yes Yes w/ water tank No Normal scheduled work (Energized UG) T2/T3 Yes Yes w/ water tank No Normal scheduled work (De-energized OH) T2/T3 Yes Yes w/ water tank No 3 Normal scheduled (De-energized UG) T2/T3 Yes Yes w/ water tank No 3 Scheduled OT work T1 Yes Yes Yes w/ water tank
Scheduled OT work T2/T3 Yes Yes w/ water tank No 3
Inspections/Patrols T1-3 Yes Yes Yes 3
RPP Generation/DOT Pipeline Work Yes Time Dependent No Touch Tree Crew Work T1 Yes Yes Yes w/ water tank
Tree Crew Work T2/T3 Yes Yes w/ water tank No
RPP Generation/DOT Pipeline Work Yes Time Dependent No Touch Active Reclosers on all 115kV circuits Yes Yes No (Reclosers Cut Out) Active Reclosers on T2/T3 12kV circuits Yes Yes No (Reclosers Cut Out) Active Reclosers on T1 12kV circuits Yes Yes Yes
Back-Up Troubleman on notice No Yes Yes
Troubleman staffing 12pm-5am No No No 4
Comments
1-For Alert Level 3 (Active Emergency) Crews would be responding to work as directed through the ICS 2-Modified may include shifting hours, tool maintenance, brush dragging, patrol for new prioritizing, etc. 3-Work may be done w/ water tank if the RFW exception is pre-approved by the Assistant Director of Utility Operations or the Line Manager for safety (work that can be done regardless of weather conditions).
Requests for approval to be submitted on the Redding Electric Utility Scheduled Overtime Work Form 4-FUTURE POSSIBILITY: If no Troubleman is available a crew may be brought in during RFW conditions to help patrol & inspect as needed
Packet Pg. 409 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) System Operating Procedure SOP-35
Operating During High Fire Threat Conditions Version 5
- 8 -
ATTACHMENT 3 – Redding Electric Utility Scheduled Overtime Work Form Removed for Public Version.
Packet Pg. 410 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
APPENDIX G
REU MONITORING
AND AUDITING
REPORT FOR
CALENDAR YEAR
2022
Packet Pg. 411 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) This Page Intentionally Left Blank
Packet Pg. 412 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Wildfire Mitigation Plan Report
REU’s 2022 Monitoring & Auditing
Annual Report on Wildfire Mitigation
Ver. No: 2.0
Date: 12/30/2022
Audit
Period 1/1/22-12/31/22
1. Scope
In conjunction with California Senate Bill (SB) 901, the City Council approved the Redding Electric Utility (REU) Wildfire Mitigation Plan (Plan) on December 3, 2019. The goals and objectives of the Plan included close monitoring and internal audits to reduce potential wildfire risks caused by or encroaching on Redding’s electric equipment and infrastructure. These goals are directly related to REU’s overarching objective of providing safe, reliable, and economical electric service to the Redding community. The Wildfire Mitigation Plan states, “Review of this Plan will occur annually, and any lessons learned will have the highest priority for improving steps in the plan, any reference programs, and the process for implementation.” Subject Matter experts within REU are responsible for the monitoring and auditing, which consisted of reviewing key elements within the Plan to document progress, identify deficiencies, improve both internal and external communications, and ensure REU continues to operate its electrical lines and equipment in a manner that minimizes the risk of catastrophic wildfire posed by its infrastructure.
2. Key Contributors
Implementation of the Wildfire Mitigation Plan is a collaborative effort with numerous City of Redding Departments working together in the areas of prevention and response, technology solutions, emergency operations, and the 10-year capital improvement plan. Information and data have been tracked throughout the 2022 calendar year to measure performance, deficiencies, and to make improvements to the Plan for upcoming years. Key City of Redding partners in the Plan include: Redding Electric Utility, Redding Police Department (RPD), Redding Fire Department (RFD), Information Technology, Parks, and Geographic Information Systems.
3. Participants in Monitoring and Auditing Plan
Contributors: Subject Matter Experts: Compliance:
Nick Zettel, Electric Utility Director
Ted Miller, Assistant Director – Utility
Operations
Shawn Avery, Electric Program
Supervisor
Nathan Aronson, Assistant Director –
Transmission and Distribution Assets
Josh Scott, Electric Manager, T & D
Asset Management
Paul Johnson, Electric Manager - Line
Jeremy Ross, Electric Program
Supervisor Line
Kris Weber, Electric Utility Engineer
Holly Johnson, Electric Manager -
Compliance
4. Process
As designated within the approved REU Wildfire Mitigation Plan, the monitoring and audit process focuses on the four key programs and eight strategies listed below to measure the effectiveness of the implementation as well as identify areas to improve upon within the Plan. Numerous tracking and Packet Pg. 413 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Wildfire Mitigation Plan Report
REU’s 2022 Monitoring & Auditing
Annual Report on Wildfire Mitigation
Ver. No: 2.0
Date: 12/30/2022
Audit
Period 1/1/22-12/31/22
reporting tools have been put into place to accurately measure the results of the Plan within the listed areas.
Programs
1. REU Wildfire Prevention & Improved Response Program
2. REU Technology Solutions Program
3. REU Emergency Operations Program
4. REU Distribution 10-Year Capital Improvement Program Strategies
1. Vegetation Management
2. Enhanced Inspections
3. Situational Awareness
4. Operational Practices
5. System Hardening
6. Public Safety and Notification
7. Reclosing and De-energization
8. Wildfire Response
A. REU Wildfire Prevention & Improved Response Program
The purpose of the Wildfire Prevention & Improved Response Program within the Plan is to establish a framework for the electric utility to conduct an effective, coordinated program to prevent catastrophic impact on REU’s infrastructure from wildfire. During the 2022 calendar year, a number of goals and objectives were met as outlined within the Plan.
1. Goals
• Prevent electric utility-caused wildfire.
• Reduce the time for the Redding Fire Department to respond to and engage fires that threaten grid infrastructure and other REU facilities.
• Increase staffing to respond to emergencies reasonably likely to impact REU facilities. • Increase available personnel for debris removal after extreme weather events. • Create community awareness for utility wildfire prevention.
2. Actions Taken
• Added six (3) additional Firefighters for a total of 15 Firefighters for improved response to wildfires impacting the Redding community. One (1) Parks Superintendent, two (2) Arborist Lead Workers, and four (4) Public Works Maintenance Workers are also funded under the Wildfire Mitigation Plan. Continued to purchase all necessary tools and equipment for prevention and response during the calendar year 2022.
Packet Pg. 414 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Wildfire Mitigation Plan Report
REU’s 2022 Monitoring & Auditing
Annual Report on Wildfire Mitigation
Ver. No: 2.0
Date: 12/30/2022
Audit
Period 1/1/22-12/31/22
• Identified all high-risk vegetation clearance zones surrounding REU infrastructure, including the Redding Power Plant, substations, and transmission and distribution lines throughout REU’s service territory.
• Conducted the annual 115kV Line Inspections in high-risk Tier 2 and Tier 3 areas by September 30, 2022.
• Completed the annual patrol and visual inspection for vegetation of all remaining Tier 2 & Tier 3 12kV lines by September 30, 2022.
• The Operations Division posted a Vegetation RFP in early 2022 and the vendor, EDM was chosen. EDM is currently drafting the Utility Vegetation Plan with a targeted completion for the first quarter of 2023. Successfully cleared 20 unmanaged high-risk locations of vegetation and performed maintenance to 29 previously managed sites in an effort to reduce the risk of electric utility-caused fires or damage to REU’s infrastructure from wildfires. Parks Division vegetation crews mitigated approximately 209 acres of dense, high-risk vegetation.
• Parks Division vegetation crews created a 30-foot perimeter around 9 substations, and the Redding Power Plant, clearing approximately 70 acres in Tier 1, Tier 2, & Tier 3 Zones.
• REU Arborists inspected, patrolled, and cleared 314.74 of 315.1 acres of 115kV transmission lines in high-risk Tier 2 & Tier 3 areas to comply with California Public Utilities Commission (CPUC) and CAL FIRE requirements.
• REU arborists inspected, patrolled, and cleared 225.71 of 230.27 acres of 12kV distribution lines in high-risk Tier 2 & Tier 3 areas to comply with CPUC and CAL FIRE requirements.
• REU Arborists trimmed 3,281 trees and removed another 703 trees directly impacting transmission and distribution power lines to reduce the threat of potential fire. • Wrapped 397 critical power poles located within high-risk areas with fire retardant material and cleared a 30-foot radius of vegetation around each pole during the fire season.
• Utilized an outside agency for goat vegetation management to clear approximately 147 acres of 21 high-risk and difficult-to-access green belt locations throughout the community.
• Provided information to the community related to all 11 Red Flag Warnings issued by the National Weather Service through social media accounts and REU web pages. • Through the efforts of REU Staff, the City of Redding successfully applied for a 2021-22 CAL FIRE Fire Prevention Grant. The City was awarded $520,083.00 for developing a City of Redding Community Fire Risk Reduction Program (Program). The Program is a comprehensive approach to engage the community in collaborative long-term wildfire risk reduction and associated greenhouse gas emission avoidance. The program dovetails planning, outreach, and on-the-ground fuel reduction activities so as to maximize community engagement and expedite risk reduction.
B. REU Technology Solutions Program
Packet Pg. 415 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Wildfire Mitigation Plan Report
REU’s 2022 Monitoring & Auditing
Annual Report on Wildfire Mitigation
Ver. No: 2.0
Date: 12/30/2022
Audit
Period 1/1/22-12/31/22
The purpose of the REU Technology Solutions Program is to protect and reduce threats to the electric utility infrastructure and the customers who rely upon it through the application of technology. The following technologies have been identified to minimize sources of ignition, manage vegetation within the City’s electric grid, enhance the productivity of utility staff, harden systems, and more effectively protect as well as notify the public if an issue arises. In addition, the listed technologies are intended to aid in the response and recovery time in the event of a wildfire.
1. Goals
• Prevent electric utility-caused wildfires.
• Increase technology use and reliability to promote interdepartmental coordination in the event of a wildfire caused by or impacting the Redding community. • Decrease response time for emergency responders to engage in emergencies that threaten grid infrastructure and other REU facilities.
2. Actions Taken
Aerial Imagery
• A city-wide aerial orthophotography project for vegetation canopy analysis was completed on November 5, 2020. This project is actively utilized and provides clear data layers related to overgrown vegetation proximate to REU facilities, as well as those areas at a higher risk of fires. Up-to-date imagery will continue to play a critical role in ensuring REU Arborists, RFD, and Parks Division crews are able to maintain a safer landscape around REU facilities and infrastructure. This program is scheduled to be completed every two years. In October 2022, a study was conducted on the vegetation canopy within the city limits, identifying private property areas with high vegetation outside the parameters related to the utility. This data may help to quantify the potential wildfire dangers within the city limits and possible vegetation management efforts. In addition, the analysis showed an increased fire risk to the community near outdoor camping sites on public property. Studies will continue during the 2023 fire season.
Unmanned Aerial Vehicles (UAV)
• The purchase and training related to UAVs were completed May 19, 2020, enabling aerial patrol of overhead lines using Forward Looking Infrared Radar (FLIR). UAVs have been used in the field throughout 2022 for public safety monitoring. Additionally, the program assists both RPD and RFD in monitoring fires as well as the investigation process to determine fire origination and initial cause. With the completion of the Emergency Operation Center (EOC), UAV cameras are able to stream live video from the field directly to the EOC as needed.
Light Detection and Ranging (LIDAR)
• After completion of the Tier 3 areas west of Redding in 2020, REU utilized the same contract firm, Quantum Spatial, to continue the vegetation survey for the rest of REU’s system in Tier 1 & 2 areas in 2021, using the LIDAR (Light Detection and Ranging) Packet Pg. 416 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Wildfire Mitigation Plan Report
REU’s 2022 Monitoring & Auditing
Annual Report on Wildfire Mitigation
Ver. No: 2.0
Date: 12/30/2022
Audit
Period 1/1/22-12/31/22
technology. LIDAR was not performed in 2022. The precise data was also used as an import to the PLS Cadd system to better model the construction of the existing transmission facilities.
Automatic Vehicle Location (AVL)
• The AVL program is critical to identify and track first responders and other emergency vehicles during events such as a wildfire. RPD patrol vehicles and RFD vehicles have been equipped with AVL devices. The City of Redding Information Technology Department worked to equip RPD Investigations vehicles and all REU vehicles with AVL devices in addition to police patrol cars and fire apparatus vehicles. The AVL system is online and part of the new EOC at REU’s Avtech Parkway Headquarters. The AVL system continues to be a valuable tool to ensure resources are dispatched efficiently to both emergencies as well as outages.
City-Wide Cameras
• The installation of cameras for REU operations, fire detection, and mitigation are critical in combating fires that may impact the electric infrastructure. Two camera systems are currently being implemented. Strategic sites in the proximity of REU’s lines and facilities were identified for the first set of fixed cameras with a live feed. Initial installation steps began in June 2020. Additionally, fixed cameras will continue to be installed at critical infrastructure sites throughout 2023. The second camera program is associated with IQ FireWatch. The City Council approved the purchase of IQ FireWatch cameras and displays on June 16, 2020. The IQ FireWatch camera technology provides early notifications of smoke up to 10 miles outside the City limits. Three key sites for camera installation were identified, and contracts with vendors were approved for construction to begin in December 2020. The project was completed on May 1, 2021, and active during the 2021 and 2022 fire seasons. An external alarm company monitored the cameras 24 hours a day from May 1, 2021, through November 30, 2021, and May 1, 2022, through November 30, 2022.
Fixed and Mobile City-Wide Communications Platform
• The need for reliable communication is vital during emergencies such as wildfires, and the City’s current radio systems required replacement. A needs assessment and careful analysis of the RPD, RFD, REU, and SHASCOM’s system needs began in early 2020. A contract between the City of Redding and Motorola Radio Communications was approved by the City Council, and the implementation of a new citywide fixed communications platform started in January 2021. The collaborative effort with several City of Redding Departments and outside industry experts was completed during the 4th quarter of 2022. Redding Police and Electric Departments successfully transitioned to the new radio system in July 2022. In addition, five radio desk sets were programmed and placed in the EOC at Avtech Parkway and one within the Redding Police Records Division. Redding Fire Department’s transition was delayed due to the 2022 fire season however they successfully moved to the new system in December of 2022. The mobile Packet Pg. 417 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Wildfire Mitigation Plan Report
REU’s 2022 Monitoring & Auditing
Annual Report on Wildfire Mitigation
Ver. No: 2.0
Date: 12/30/2022
Audit
Period 1/1/22-12/31/22
command communication platform was approved by the City Council on October 6, 2020, and was completed in July 2021. The Mobile Command Center has been continually utilized for emergency responses throughout 2021, as well as emergency incident training, special events, and during a large hazmat spill in downtown Redding in January 2022.
Department Operations Center (DOC)
• A majority of the data, imagery, and communication resources from the Technology Program have been integrated into a Department Operations Center at REU’s Avtech Parkway headquarters. This facility was designated by the City Council as the City’s new Emergency Operations Center (EOC) following its completion during the second quarter of 2021. The technology includes aerial Imagery, real-time UAV imagery, automatic vehicle locations, fixed cameras, IQ FireWatch, unified communications, and REU system data received and managed through the DOC. REU and the City of Redding can now coordinate with partner agencies, communicate with customers and the media, and most importantly, ensure field staff has access to evolving real-time information during emergency operations. An action committee has been established to prioritize improvements to the information fed into the DOC. The objective will be to ensure that all data available is connectable, robust, and accurate with qualified, trained personnel to use, rather than creating new data.
C. REU Emergency Operation Program
The purpose of the REU Emergency Operations Program (EOP) is intended to provide structured guidance for REU staff to effectively manage emergencies from an all-hazards approach and is modeled after the ICS structure followed by the City of Redding’s Emergency Operations Plan.
1. Goals
• Operational readiness for staff to effectively and efficiently manage all aspects of a large emergency such as a wildfire.
• Communicate timely information to all stakeholders, including staff, customers, City Management, the City Council, and the media.
• Establish clear roles and tasks for REU staff within the Emergency Operations structure under Incident Command.
2. Actions Taken
• The REU Emergency Operations Standard Operating Procedure (SOP) was activated six (6) times for a total of 10 days during the 2022 calendar year as a result of the National Weather Service issuing Red Flag Warnings for the Redding area. • REU conducted an emergency drill on March 29, 2022, to ensure operational readiness for the wildfire season. An additional drill was completed on November 16, 2022. • The Emergency Operations SOP was activated during the Flanagan Fire on March 4, 2022, and the Branstetter Fire on September 1, 2022.
Packet Pg. 418 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Wildfire Mitigation Plan Report
REU’s 2022 Monitoring & Auditing
Annual Report on Wildfire Mitigation
Ver. No: 2.0
Date: 12/30/2022
Audit
Period 1/1/22-12/31/22
• An Emergency 911 software application was installed at the Power Control Center, providing immediate notifications directly from SHASCOM of wildfires in or near the City of Redding limits.
• An inter-agency cooperation and communication protocol continues to be updated with Shasta County Health and Human Services.
• REU Communications actively posted Red Flag notifications to the public and news media through social media, REU’s website, and press releases. • REU successfully implemented a new emergency notification system through the Civic Ready platform for email and text notifications to City employees related to urgent communications.
• New P25 Motorola radio system implemented in 2022 for internal and interdepartmental communications. Mobile radios were installed in all designated REU Distribution vehicles, and new handheld radios were distributed to field staff.
D.REU Distribution 10-Year Capital Improvement Program
The purpose of the Distribution 10-Year Capital Improvement Program is to enhance the distribution system by replacing specific components to reduce the probability that the system will initiate a fire and harden the electrical distribution system to better survive a fire initiated by other sources. In order to complete the necessary system hardening efforts within the required timeline, including fuse and arrestor replacement and additional circuit reclosers, contract line workers will need to be utilized to supplement REU’s workforce. REU Line personnel are currently unable to take on these significant improvement projects due to the required routine maintenance of the existing infrastructure and multiple vacant positions.
For a timeline of present and future improvement work items, see the chart on page 11. Listed below are specific actions taken to date to work towards the stated goals.
1. Goals
• Enhanced inspections and tracking of assets.
• System hardening of key subsystems.
• Improved situational awareness.
• System improvements providing better operational practices. • The addition of switching to provide precision de-energization.
2. Actions Taken
• Modifications were made to one additional 12kV distribution circuit, allowing the automatic reclosing action to be re-enabled for this circuit during Red Flag Warnings.
To date, a total of five circuits have had reclosing re-enabled since the implementation of the Plan.
• A Work Order has been created for priority work in Tier 3 and Tier 2 areas. This effort will fire harden an additional 11 circuits, which will allow their automatic reclosing action to be re-enabled during Red Flag Warnings. Required materials have been Packet Pg. 419 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Wildfire Mitigation Plan Report
REU’s 2022 Monitoring & Auditing
Annual Report on Wildfire Mitigation
Ver. No: 2.0
Date: 12/30/2022
Audit
Period 1/1/22-12/31/22
purchased, received and installation is approximately 90% complete and projected to be completed before the 2023 fire season.
• To date, 295 fault indicators for overhead circuits have been installed at strategic locations to aid the Troublemen to more quickly identify the location of the faulted line resulting in reduced customer restoration times. In addition, fault indicators have been installed at four underground locations, with an additional 40 locations identified for installation. The underground circuits tend to be the most time-consuming construction type to both troubleshoot and isolate the faulted location. • GIS Software is being upgraded to expand the use of tablet-based inspection for overhead lines and vegetation management. This will greatly improve the identification and tracking of hazards found, work performed, and work remaining over the present paper-based system.
• Engineering finalized all animal-related system hardening construction standards on April 6, 2021. Materials were purchased for animal guards and covered jumper wires, and installation is 90% complete for priority Tier 3 areas. This will help reduce outages and occasional fires initiated by animal and tree contact with exposed conductorsin the high-fire threat areas.
• Engineering finalized all construction standards on April 6, 2021, for the installation of non-arcing fuses and non-arcing surge arrestors to be implemented in Tier 2 and Tier 3 areas. Materials have been purchased, and installation is 90% complete for priority Tier 2 and Tier 3 hazard areas.
• An improved customer-facing, web-based outage map was created for improved customer awareness of outages and restoration times. The system is accessible on the REU web page and became operational at the end of October 2021. • As of December 22, 2022, 397 out of 800 wooden poles in high fire threat zones have been wrapped with fire retardant webbing.
E. Audit Findings
1. Audit Findings Related to CPUC Fire Threat Map
• The CPUC Fire Threat map was reviewed for changes on December 29, 2022. No boundary changes were noted for the 2022 calendar year. • Previously modified 12kV circuits were evaluated for compliance with the mitigation recommendations to keep these circuits on the Circuit Recloser Enabled list. • Vegetation mitigation efforts, approved by the Redding Fire Marshall, on June 21, 2021, were repeated in the spring of 2022 for the 12kV circuits allowing their addition to the Circuit Recloser Enabled list.
2. Audit Findings Related to Fire Ignitions.
• Number of fires caused by REU facilities:
Fire Threat Zone Number of Fires Initiated Number of Fires on RFW Day Tier 1 5 0
Packet Pg. 420 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Wildfire Mitigation Plan Report
REU’s 2022 Monitoring & Auditing
Annual Report on Wildfire Mitigation
Ver. No: 2.0
Date: 12/30/2022
Audit
Period 1/1/22-12/31/22
Tier 2 1 0
Tier 3 0 0
The Plan requires REU to describe any fires greater than one acre. One fire was caused by a squirrel climbing between two pot heads (overhead cable terminations). The arching caused a vegetation fire of 1.94 acres on August 8, 2022.
3. Audit Finding Related to Wires Down
• A wire-down event includes any instance where an electric transmission or primary distribution conductor falls to the ground or on a foreign object:
Date Outage No. Fire Threat Zone Line Voltage Cause
3-18-22 J.E.22.03.038 Tier 1 12kV Third-Party
03/22/22 J.E.22.03.042 Tier 1 12kV Third-Party Vehicle
Caused
04/25/22 J.E.22.04.055 Tier 1 12kV Third-Party Vehicle
Caused
05/28/22 J.E.22.05.062 Tier 1 12kV High Wind-Tree
08/25/22 J.E.22.07.052 Tier 1 12kV Animal/Bird
12/27/22 J.E.22.12.084 Tier 2 Secondary Tree
4. Identifying Corrective Deficiencies in the Plan:
• REU has not received any notice of deficiencies or potential deficiencies in the 2022 calendar year, and there are no logged deficiencies to report.
5. Monitoring the Effectiveness of the Inspections:
• Inspection reports and progress have been reviewed quarterly for overhead lines. After creating dedicated Electrical Inspector positions, completion of critical inspections has significantly improved for both overhead & underground inspections. Additionally, REU is implementing an improved software-based Workforce Management System and Mimms-based inspection, implemented by SSP Innovations, to ensure that the inspections/repair process is being performed to industry best practices. • Overhead LIDAR Surveys of REU’s transmission and distribution system used in 2020 and 2021 to confirm the effectiveness of the past vegetation inspection program. REU intends to repeat the Lidar survey approximately every 3rd year. In 2022, REU initiated using contract inspectors, EDM Intl, to perform a detailed GIS-based vegetation inspection of all 12kV primary areas. Tier 1 areas had been deemed the lowest priority in previous years, but now the focus is to complete new priorities found by the detailed inspections per best practices and CPUC, General Order-95.
Packet Pg. 421 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update) Wildfire Mitigation Plan Report
REU’s 2022 Monitoring & Auditing
Annual Report on Wildfire Mitigation
Ver. No: 2.0
Date: 12/30/2022
Audit
Period 1/1/22-12/31/22
F. Lessons Learned to Incorporate into Future Plans
• The number of transmitting fault indicators has been increased with the completion of repeaters at the substations. Non-transmitting fault indicators have also been determined as adequate and more flexible in deployment for rapid identification of the faulted line portion. This information is helpful since the disabling of automatic circuit reclosers greatly increased the outage time before restoration. • The Priority 1, Non-arcing surge arrestors and fuses for the 12kV distribution are nearly complete. The Priority 2 equipment is taking considerably longer than anticipated due to the number of crews available, the customer outage notification process, and the large number of locations to be modified. The completion date for this effort was extended an additional year.
• The initial concept of pre-spraying the power poles in the high-risk areas with fire retardant prior to fire season was a great effort for staffing. New technology has been developed which wraps the base of the pole with a fire-retardant webbing. REU’s design standards have been modified and material purchased allowing REU to phase out the spraying process and focus on the application of the pole webbing. As noted above, over 300 poles were wrapped during the 2022 calendar year.
5. Revision History
Revision: Revision Description: Date:
1.0 Original document 12/1/2020
2.0 2021 Monitoring & Auditing Annual Report 12/7/2021
3.0 2022 Monitoring & Auditing Annual Report 12/30/22
Packet Pg. 422 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023 Wildfire Mitigation Plan Update)
Calendar Year 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 WMP Year # 1 2 3 4 5 6 7 8 9 10
Item # Fiscal Year 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 1 Field verify and revise Tier 2 and Tier 3
boundary
Complete
2 Perform necessary tree trimming and
vegetation removal in priority areas
Complete
3 Reconfigure specific distribution circuits to
feed only Tier 1 areas Complete
4 Install non-arcing arrestors, fuses, and
bird/squirrel guards, covered jumpers in T2/T3 X X X X X 5 Create 30-foot sterilized perimeter for
substations in T2 and T3 areas Complete
6 Apply fire retardant or fire wrap to wood poles
for T2 and T3 areas X X X X X X
7 Install fault indicators for faster location of
distribution outages X X X
8 Install mesh network to retrieve outage data
from Remote Metering Project Complete
9 Connect line fault indicator data to SCADA Complete
10 Integrate remote meter data and fault indicator
data with Outage Management System X X X
11 Provide secondary water source to Power Plant Complete 12 Install additional 12KV switches at T1
boundary Complete
13 Install fast reclosers/sectionalizers at T1
boundary X X X
14 Convert overhead to underground for critical
COR water facilities X X
15 Improve existing access roads and add
additional to critical sections of the system X X X X X 16 Replace 115KV wood poles with Steel or
Laminate in T2 and T3 areas X X X X X X X X
17 Convert overhead circuits to underground
where practical in T2 and T3 areas. X X X X X X
18 Convert Keswick River crossing from wood to
steel X X
19 Upgrade 12KV Breaker Protect Relay to better
coordinate with circuit fusing X X X X
Revised December 2022
Packet Pg. 423 Attachment: REU 2023 Wildfire Mitigation Plan with Appendices (9.5(b)--Redding Electric Utility's 2023
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Adopt Resolution approving an adjustment to the RIEO Supervisory/Confidential Exempt and the RIEO CTP Exempt Schedule of Classifications and Wage Rates, for salary increases for the Engineer series and Construction Manager classifications effective July 23, 2023.
Fiscal Impact
The estimated total compensation cost, including salary and benefits, to increase wages of the Engineer series and Construction Manager classifications along with an additional seven percent increase on July 23, 2023, and three percent increase on July 21, 2024, is $445,044. There is no impact to the General Fund due to applicable cross-charging associated with the engineering work performed.
Alternative Action
The City Council could decline to approve the resolution, and the salary increases would not occur.
Background/Analysis
The Public Works Department has had difficulty recruiting and retaining employees in the Assistant Engineer, Associate Engineer, Senior Engineer, and Construction Manager classifications. Reasons for these challenges include having an extremely competitive job market and the difficulty in attracting qualified candidates. Salary studies show the City of Redding’s (City) wage rates for these classifications are significantly lower than local competitive agencies, including the County of Shasta and California Department of Transportation (Caltrans).
MEETING DATE: May 2, 2023
ITEM NO. 9.15(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 9.15(a) - Consider Resolution amending the Redding Independent Employees' Organization (RIEO) Supervisory/Confidential Exempt and the Clerical, Technical and Professional (CTP) Exempt Schedule of Classifications and Wage Rates.
Kelley Martinez, Interim
Personnel Director
Packet Pg. 424
Report to Redding City Council April 26, 2023
Re: 9.15(a)--Salary schedule changes for RIEO Engineers & Construction Manager Page 2 RIEO members are scheduled to receive a five percent wage increase in July 2023, and another five percent wage increase in July 2024. However, even after these increases, the Engineer series and Construction Manager classifications will continue to be below local market wage rates.
Therefore, in order to remain competitive for these select positions in the local labor market, it is recommended that the City increase the wage rates for the Assistant Engineer, Associate Engineer, Senior Engineer, and Construction Manager classifications by an additional seven percent in 2023, and three percent in 2024, which added to the already schedule increases for RIEO would total 12 percent in 2023, and eight percent in 2024.
Environmental Review
This is not a project defined under California Environmental Quality Act (CEQA), and no further action is required.
Council Priority/City Manager Goals
• Government of the 21st Century – “Be relevant and proactive to the opportunities and challenges of today’s residents and workforce. Anticipate the future to make better decisions today.”
Attachments
^Resolution
RIEO CTP Exempt-July 23, 2023
RIEO CTP Exempt-July 21, 2024
RIEO SC Exempt-July 23, 2023
RIEO SC Exempt-July 21, 2024
Packet Pg. 425
RESOLUTION NO. 2023-___
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING
APPROVING ADJUSTMENTS TO THE REDDING INDEPENDENT
EMPLOYEES’ ORGANIZATION (RIEO) SUPERVISORY/CONFIDENTIAL
EXEMPT SCHEDULE OF CLASSIFICATIONS AND WAGE RATES, AND
THE CLERICAL, TECHNICAL AND PROFESSIONAL EXEMPT
SCHEDULE OF CLASSIFICATIONS AND WAGE RATES, FOR SALARY
INCREASES FOR THE ENGINEER SERIES AND CONSTRUCTION
MANAGER CLASSIFICATIONS EFFECTIVE JULY 23, 2023
WHEREAS, staff has recommended that the Redding Independent Employees’ Organization Supervisory/Confidential Exempt Schedule of Classifications and Wage Rates, and the Clerical, Technical and Professional Exempt Schedule of Classifications and Wage Rates be amended to provide a 10% salary increase to the Assistant Engineer, Associate Engineer, Senior Engineer and Construction Manager classifications over two years; and WHEREAS, the City Council deems it to be in the best interest of the City to adopt such recommendation;
NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council that the Redding Independent Employees’ Organization Supervisory/Confidential Exempt Schedule of Classifications and Wage Rates, and the Clerical, Technical and Professional Exempt Schedule of Classifications and Wage Rates be amended to provide a 10% salary increase to the Assistant Engineer, Associate Engineer, Senior Engineer and Construction Manager classifications over two years, effective July 23, 2023.
I HEREBY CERTIFY that the foregoing resolution was introduced and adopted at a regular meeting of the City Council of the City of Redding on the 2nd day of May, 2023, by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
___________________________________
MICHAEL DACQUISTO, Mayor
ATTEST: FORM APPROVED:
________________________________ ___________________________________ PAMELA MIZE, City Clerk BARRY E. DeWALT, City Attorney
Packet Pg. 426 Attachment: ^Resolution (9.15(a)--Salary schedule changes for RIEO Engineers & Construction Manager) Classification 1 2 3 4 5 6 7 8
118 Associate Civil Engineer $7,738 $8,125 $8,531 $8,957 $9,405 $9,876 $10,369 $10,888 146 Senior Project Coordinator - Community $7,230 $7,592 $7,971 $8,370 $8,788 $9,228 $9,689 $10,174 243 Senior Project Coordinator - Technical $7,230 $7,592 $7,971 $8,370 $8,788 $9,228 $9,689 $10,174 119 Senior Planner $7,009 $7,360 $7,728 $8,114 $8,520 $8,946 $9,393 $9,862 218 Senior Transportation Planner $6,941 $7,288 $7,653 $8,035 $8,437 $8,859 $9,302 $9,767 139 Senior GIS Analyst $6,805 $7,146 $7,503 $7,878 $8,272 $8,686 $9,120 $9,576 223 Plan Check Engineer $6,742 $7,079 $7,433 $7,805 $8,195 $8,605 $9,035 $9,487 225 Senior Survey Party Chief $6,689 $7,024 $7,375 $7,744 $8,131 $8,538 $8,964 $9,413 132 Traffic Engineer/Planner $6,645 $6,977 $7,326 $7,693 $8,077 $8,481 $8,905 $9,350 174 Applications Analyst III $6,613 $6,944 $7,291 $7,656 $8,039 $8,440 $8,863 $9,306 158 Associate Project Coordinator - Community $6,570 $6,899 $7,244 $7,606 $7,986 $8,385 $8,805 $9,245 230 Associate Project Coordinator - Technical $6,570 $6,899 $7,244 $7,606 $7,986 $8,385 $8,805 $9,245 140 Associate Environmental Specialist $6,509 $6,834 $7,176 $7,535 $7,912 $8,307 $8,723 $9,159 163 Assistant Engineer $6,460 $6,783 $7,123 $7,479 $7,853 $8,245 $8,658 $9,090 141 Associate Planner $6,310 $6,625 $6,957 $7,304 $7,670 $8,053 $8,456 $8,879 178 Transportation Planner $6,310 $6,625 $6,957 $7,304 $7,670 $8,053 $8,456 $8,879 148 Senior Fire Protection Plans Examiner $6,131 $6,437 $6,759 $7,097 $7,452 $7,824 $8,216 $8,626 162 Senior Plan Checker $6,131 $6,437 $6,759 $7,097 $7,452 $7,824 $8,216 $8,626 233 Survey Party Chief $6,081 $6,385 $6,704 $7,040 $7,392 $7,761 $8,149 $8,557 167 Safety Specialist $6,074 $6,378 $6,697 $7,031 $7,383 $7,752 $8,140 $8,547 229 Applications Analyst II $5,998 $6,298 $6,613 $6,944 $7,291 $7,655 $8,038 $8,440 154 Accountant II $5,965 $6,264 $6,577 $6,906 $7,251 $7,614 $7,994 $8,394 232 Management Analyst II $5,965 $6,264 $6,577 $6,906 $7,251 $7,614 $7,994 $8,394 207 Senior Marketing Specialist $5,953 $6,251 $6,563 $6,891 $7,236 $7,598 $7,977 $8,376 204 Senior Building Inspector $5,729 $6,015 $6,316 $6,632 $6,964 $7,312 $7,677 $8,061 206 Industrial Waste Analyst Grade III $5,671 $5,955 $6,252 $6,565 $6,893 $7,238 $7,600 $7,980 205 Industrial Waste Analyst Grade II $5,533 $5,809 $6,100 $6,405 $6,725 $7,061 $7,414 $7,785 234 Plans Examiner $5,502 $5,777 $6,066 $6,370 $6,688 $7,023 $7,374 $7,742 228 Applications Analyst I $5,440 $5,712 $5,998 $6,298 $6,613 $6,944 $7,291 $7,655 159 Assistant Project Coordinator - Community $5,248 $5,511 $5,786 $6,075 $6,379 $6,698 $7,033 $7,385 226 Assistant Project Coordinator - Technical $5,248 $5,511 $5,786 $6,075 $6,379 $6,698 $7,033 $7,385 177 Assistant Planner $5,235 $5,497 $5,772 $6,061 $6,364 $6,682 $7,016 $7,367 239 Senior Buyer $5,230 $5,491 $5,766 $6,054 $6,357 $6,675 $7,008 $7,359 325 Landscape Planning Specialist $5,228 $5,490 $5,764 $6,052 $6,355 $6,673 $7,006 $7,357 199 Accountant I $5,177 $5,436 $5,707 $5,993 $6,292 $6,607 $6,937 $7,284 231 Management Analyst I $5,177 $5,436 $5,707 $5,993 $6,292 $6,607 $6,937 $7,284 198 Communication Marketing Coordinator $5,177 $5,436 $5,707 $5,993 $6,292 $6,607 $6,937 $7,284 238 Buyer $4,670 $4,904 $5,149 $5,406 $5,676 $5,960 $6,258 $6,571 189 Contract Compliance Technician $4,471 $4,695 $4,929 $5,176 $5,435 $5,706 $5,992 $6,291 Note: Pay rates are calculated utilizing a standardized formula and small differences may occur due to rounding.
Monthly Salary Rates – Salary Steps
REDDING INDEPENDENT EMPLOYEES ORGANIZATION
CLERICAL, TECHNICAL AND PROFESSIONAL UNIT
EXHIBIT "B-2"
EXEMPT EMPLOYEE SCHEDULE OF CLASSIFICATIONS AND SALARY RANGES Effective: July 23, 2023
Packet Pg. 427 Attachment: RIEO CTP Exempt-July 23, 2023 (9.15(a)--Salary schedule changes for RIEO Engineers & Construction Manager) Classification 1 2 3 4 5 6 7 8
118 Associate Civil Engineer $8,357 $8,775 $9,213 $9,674 $10,158 $10,666 $11,199 $11,759 146 Senior Project Coordinator - Community $7,592 $7,971 $8,370 $8,788 $9,228 $9,689 $10,174 $10,682 243 Senior Project Coordinator - Technical $7,592 $7,971 $8,370 $8,788 $9,228 $9,689 $10,174 $10,682 119 Senior Planner $7,360 $7,728 $8,114 $8,520 $8,946 $9,393 $9,862 $10,356 218 Senior Transportation Planner $7,288 $7,653 $8,035 $8,437 $8,859 $9,302 $9,767 $10,255 139 Senior GIS Analyst $7,146 $7,503 $7,878 $8,272 $8,686 $9,120 $9,576 $10,055 223 Plan Check Engineer $7,079 $7,433 $7,805 $8,195 $8,605 $9,035 $9,487 $9,961 225 Senior Survey Party Chief $7,024 $7,375 $7,744 $8,131 $8,538 $8,964 $9,413 $9,883 132 Traffic Engineer/Planner $6,977 $7,326 $7,693 $8,077 $8,481 $8,905 $9,350 $9,818 163 Assistant Engineer $6,977 $7,326 $7,692 $8,077 $8,481 $8,905 $9,350 $9,818 174 Applications Analyst III $6,944 $7,291 $7,656 $8,039 $8,440 $8,863 $9,306 $9,771 158 Associate Project Coordinator - Community $6,899 $7,244 $7,606 $7,986 $8,385 $8,805 $9,245 $9,707 230 Associate Project Coordinator - Technical $6,899 $7,244 $7,606 $7,986 $8,385 $8,805 $9,245 $9,707 140 Associate Environmental Specialist $6,834 $7,176 $7,535 $7,912 $8,307 $8,723 $9,159 $9,617 141 Associate Planner $6,625 $6,957 $7,304 $7,670 $8,053 $8,456 $8,879 $9,322 178 Transportation Planner $6,625 $6,957 $7,304 $7,670 $8,053 $8,456 $8,879 $9,322 148 Senior Fire Protection Plans Examiner $6,437 $6,759 $7,097 $7,452 $7,824 $8,216 $8,626 $9,058 162 Senior Plan Checker $6,437 $6,759 $7,097 $7,452 $7,824 $8,216 $8,626 $9,058 233 Survey Party Chief $6,385 $6,704 $7,040 $7,392 $7,761 $8,149 $8,557 $8,985 167 Safety Specialist $6,378 $6,697 $7,031 $7,383 $7,752 $8,140 $8,547 $8,974 229 Applications Analyst II $6,298 $6,613 $6,944 $7,291 $7,655 $8,038 $8,440 $8,862 154 Accountant II $6,264 $6,577 $6,906 $7,251 $7,614 $7,994 $8,394 $8,814 232 Management Analyst II $6,264 $6,577 $6,906 $7,251 $7,614 $7,994 $8,394 $8,814 207 Senior Marketing Specialist $6,251 $6,563 $6,891 $7,236 $7,598 $7,977 $8,376 $8,795 204 Senior Building Inspector $6,015 $6,316 $6,632 $6,964 $7,312 $7,677 $8,061 $8,464 206 Industrial Waste Analyst Grade III $5,955 $6,252 $6,565 $6,893 $7,238 $7,600 $7,980 $8,379 205 Industrial Waste Analyst Grade II $5,809 $6,100 $6,405 $6,725 $7,061 $7,414 $7,785 $8,174 234 Plans Examiner $5,777 $6,066 $6,370 $6,688 $7,023 $7,374 $7,742 $8,129 228 Applications Analyst I $5,712 $5,998 $6,298 $6,613 $6,944 $7,291 $7,655 $8,038 159 Assistant Project Coordinator - Community $5,511 $5,786 $6,075 $6,379 $6,698 $7,033 $7,385 $7,754 226 Assistant Project Coordinator - Technical $5,511 $5,786 $6,075 $6,379 $6,698 $7,033 $7,385 $7,754 177 Assistant Planner $5,497 $5,772 $6,061 $6,364 $6,682 $7,016 $7,367 $7,735 239 Senior Buyer $5,491 $5,766 $6,054 $6,357 $6,675 $7,008 $7,359 $7,727 325 Landscape Planning Specialist $5,490 $5,764 $6,052 $6,355 $6,673 $7,006 $7,357 $7,724 199 Accountant I $5,436 $5,707 $5,993 $6,292 $6,607 $6,937 $7,284 $7,649 231 Management Analyst I $5,436 $5,707 $5,993 $6,292 $6,607 $6,937 $7,284 $7,649 198 Communication Marketing Coordinator $5,436 $5,707 $5,993 $6,292 $6,607 $6,937 $7,284 $7,649 238 Buyer $4,904 $5,149 $5,406 $5,676 $5,960 $6,258 $6,571 $6,900 189 Contract Compliance Technician $4,695 $4,929 $5,176 $5,435 $5,706 $5,992 $6,291 $6,606 Note: Pay rates are calculated utilizing a standardized formula and small differences may occur due to rounding.
Monthly Salary Rates – Salary Steps
REDDING INDEPENDENT EMPLOYEES ORGANIZATION
CLERICAL, TECHNICAL AND PROFESSIONAL UNIT
EXHIBIT "B-3"
EXEMPT EMPLOYEE SCHEDULE OF CLASSIFICATIONS AND SALARY RANGES Effective: July 21, 2024
Packet Pg. 428 Attachment: RIEO CTP Exempt-July 21, 2024 (9.15(a)--Salary schedule changes for RIEO Engineers & Construction Manager) Classification 1 2 3 4 5 6 7 8
####### ###### ###### ####### ####### 0.9070295 0.9523810 124 Senior Civil Engineer $8,762 $9,200 $9,660 $10,143 $10,650 $11,183 $11,742 $12,329 74 Construction Manager $8,207 $8,618 $9,049 $9,501 $9,976 $10,475 $10,999 $11,549 216 City Surveyor $7,720 $8,106 $8,512 $8,937 $9,384 $9,853 $10,346 $10,863 176 Information Technology Supervisor $7,603 $7,983 $8,383 $8,802 $9,242 $9,704 $10,189 $10,699 183 Public Works Supervisor - Water $7,436 $7,808 $8,198 $8,608 $9,038 $9,490 $9,965 $10,463 596 P/W Supervisor Wastewater-Grade V $7,202 $7,562 $7,941 $8,338 $8,754 $9,192 $9,652 $10,134 221 Permit Center Supervisor $7,111 $7,466 $7,840 $8,232 $8,643 $9,075 $9,529 $10,006 222 Development Services Supervisor $7,111 $7,466 $7,840 $8,232 $8,643 $9,075 $9,529 $10,006 597 P/W Supervisor Wastewater-Grade IV $7,039 $7,391 $7,760 $8,148 $8,556 $8,983 $9,432 $9,904 173 Housing Program Supervisor $6,906 $7,252 $7,614 $7,995 $8,395 $8,815 $9,255 $9,718 200 Network Administrator II $6,855 $7,198 $7,558 $7,936 $8,333 $8,749 $9,187 $9,646 201 Systems Administrator II $6,855 $7,198 $7,558 $7,936 $8,333 $8,749 $9,187 $9,646 171 Senior Accountant $6,783 $7,122 $7,478 $7,852 $8,245 $8,657 $9,090 $9,544 208 P/W Supervisor - Solid Waste Operations $6,695 $7,029 $7,381 $7,750 $8,137 $8,544 $8,971 $9,420 174 Applications Analyst III $6,613 $6,944 $7,291 $7,656 $8,039 $8,440 $8,863 $9,306 187 Assistant City Clerk $6,564 $6,892 $7,236 $7,598 $7,978 $8,377 $8,796 $9,236 188 Deputy City Treasurer $6,564 $6,892 $7,236 $7,598 $7,978 $8,377 $8,796 $9,236 211 Code Enforcement Supervisor $6,301 $6,616 $6,947 $7,295 $7,659 $8,042 $8,444 $8,867 161 Inspection Services Supervisor $6,301 $6,616 $6,947 $7,295 $7,659 $8,042 $8,444 $8,867 598 Wastewater Compliance Coordinator $6,230 $6,541 $6,868 $7,212 $7,572 $7,951 $8,348 $8,766 196 Database Administrator $6,218 $6,529 $6,855 $7,198 $7,558 $7,936 $8,333 $8,749 142 Network Administrator I $6,218 $6,529 $6,855 $7,198 $7,558 $7,936 $8,333 $8,749 143 Systems Administrator I $6,218 $6,529 $6,855 $7,198 $7,558 $7,936 $8,333 $8,749 149 Water Systems Specialist (D3/D4) $6,183 $6,492 $6,817 $7,158 $7,516 $7,892 $8,286 $8,700 215 Personnel Analyst II $6,124 $6,430 $6,752 $7,089 $7,444 $7,816 $8,207 $8,617 168 Public Works Supervisor $6,021 $6,322 $6,639 $6,971 $7,319 $7,685 $8,069 $8,473 229 Applications Analyst II $5,998 $6,298 $6,613 $6,944 $7,291 $7,655 $8,038 $8,440 170 Water Conservation Specialist $5,993 $6,292 $6,607 $6,937 $7,284 $7,648 $8,031 $8,432 232 Management Analyst II $5,965 $6,264 $6,577 $6,906 $7,251 $7,614 $7,994 $8,394 144 Technical Services Supervisor $5,866 $6,159 $6,467 $6,791 $7,130 $7,487 $7,861 $8,254 210 Senior Housing Specialist $5,810 $6,101 $6,406 $6,726 $7,062 $7,415 $7,786 $8,175 235 Crime Analyst $5,644 $5,926 $6,223 $6,534 $6,860 $7,203 $7,564 $7,942 147 Utility Field Services Supervisor $5,533 $5,809 $6,100 $6,405 $6,725 $7,061 $7,414 $7,785 160 Facility Supervisor $5,533 $5,809 $6,100 $6,405 $6,725 $7,061 $7,414 $7,785 157 Fleet Shop Supervisor $5,533 $5,809 $6,100 $6,405 $6,725 $7,061 $7,414 $7,785 100 Wastewater Laboratory Supervisor $5,463 $5,736 $6,023 $6,324 $6,640 $6,972 $7,321 $7,687 228 Applications Analyst I $5,440 $5,712 $5,998 $6,298 $6,613 $6,944 $7,291 $7,655 213 Engineering Technician III $5,422 $5,693 $5,978 $6,277 $6,591 $6,920 $7,266 $7,630 145 NPDES Coordinator $5,374 $5,642 $5,924 $6,221 $6,532 $6,858 $7,201 $7,561 Classification 1 2 3 4 5 6 7 8
214 Personnel Analyst I $5,313 $5,578 $5,857 $6,150 $6,458 $6,781 $7,120 $7,476 237 Customer Service Supervisor $5,181 $5,440 $5,712 $5,998 $6,298 $6,613 $6,943 $7,291 Monthly Salary Rates - Salary Steps
Monthly Salary Rates - Salary Steps
REDDING INDEPENDENT EMPLOYEES ORGANZIATION
SUPERVISORY/CONFIDENTIAL UNIT
EXHIBIT "B-2"
EXEMPT EMPLOYEE SCHEDULE OF CLASSIFICATIONS AND SALARY RANGES Effective: July 23, 2023
Packet Pg. 429 Attachment: RIEO SC Exempt-July 23, 2023 (9.15(a)--Salary schedule changes for RIEO Engineers & Construction Manager) 224 Recreation Supervisor II $5,147 $5,405 $5,675 $5,959 $6,257 $6,569 $6,898 $7,243 186 Police Services Supervisor $5,020 $5,271 $5,535 $5,811 $6,102 $6,407 $6,727 $7,064 241 Office Services Supervisor $4,844 $5,087 $5,341 $5,608 $5,888 $6,183 $6,492 $6,817 193 Recreation Supervisor I $4,739 $4,976 $5,224 $5,486 $5,760 $6,048 $6,350 $6,668 217 Workflow Coordinator $4,546 $4,773 $5,012 $5,262 $5,526 $5,802 $6,092 $6,397 250 Executive Assistant to Assistant $4,271 $4,484 $4,708 $4,944 $5,191 $5,450 $5,723 $6,009 City Manager
126.00
Note: Pay rates are calculated utilizing a standardized formula and small differences may occur due to rounding.
Packet Pg. 430 Attachment: RIEO SC Exempt-July 23, 2023 (9.15(a)--Salary schedule changes for RIEO Engineers & Construction Manager) Classification 1 2 3 4 5 6 7 8
####### ###### ####### ####### ####### 0.9070295 0.9523810 124 Senior Civil Engineer $9,463 $9,936 $10,433 $10,954 $11,502 $12,077 $12,681 $13,315 74 Construction Manager $8,864 $9,307 $9,773 $10,261 $10,774 $11,313 $11,879 $12,473 216 City Surveyor $8,106 $8,512 $8,937 $9,384 $9,853 $10,346 $10,863 $11,406 176 Information Technology Supervisor $7,983 $8,383 $8,802 $9,242 $9,704 $10,189 $10,699 $11,233 183 Public Works Supervisor - Water $7,808 $8,198 $8,608 $9,038 $9,490 $9,965 $10,463 $10,986 596 P/W Supervisor Wastewater-Grade V $7,562 $7,941 $8,338 $8,754 $9,192 $9,652 $10,134 $10,641 221 Permit Center Supervisor $7,466 $7,840 $8,232 $8,643 $9,075 $9,529 $10,006 $10,506 222 Development Services Supervisor $7,466 $7,840 $8,232 $8,643 $9,075 $9,529 $10,006 $10,506 597 P/W Supervisor Wastewater-Grade IV $7,391 $7,760 $8,148 $8,556 $8,983 $9,432 $9,904 $10,399 173 Housing Program Supervisor $7,252 $7,614 $7,995 $8,395 $8,815 $9,255 $9,718 $10,204 200 Network Administrator II $7,198 $7,558 $7,936 $8,333 $8,749 $9,187 $9,646 $10,128 201 Systems Administrator II $7,198 $7,558 $7,936 $8,333 $8,749 $9,187 $9,646 $10,128 171 Senior Accountant $7,122 $7,478 $7,852 $8,245 $8,657 $9,090 $9,544 $10,021 208 P/W Supervisor - Solid Waste Operations $7,029 $7,381 $7,750 $8,137 $8,544 $8,971 $9,420 $9,891 174 Applications Analyst III $6,944 $7,291 $7,656 $8,039 $8,440 $8,863 $9,306 $9,771 187 Assistant City Clerk $6,892 $7,236 $7,598 $7,978 $8,377 $8,796 $9,236 $9,698 188 Deputy City Treasurer $6,892 $7,236 $7,598 $7,978 $8,377 $8,796 $9,236 $9,698 211 Code Enforcement Supervisor $6,616 $6,947 $7,295 $7,659 $8,042 $8,444 $8,867 $9,310 161 Inspection Services Supervisor $6,616 $6,947 $7,295 $7,659 $8,042 $8,444 $8,867 $9,310 598 Wastewater Compliance Coordinator $6,541 $6,868 $7,212 $7,572 $7,951 $8,348 $8,766 $9,204 196 Database Administrator $6,529 $6,855 $7,198 $7,558 $7,936 $8,333 $8,749 $9,187 142 Network Administrator I $6,529 $6,855 $7,198 $7,558 $7,936 $8,333 $8,749 $9,187 143 Systems Administrator I $6,529 $6,855 $7,198 $7,558 $7,936 $8,333 $8,749 $9,187 149 Water Systems Specialist (D3/D4) $6,492 $6,817 $7,158 $7,516 $7,892 $8,286 $8,700 $9,135 215 Personnel Analyst II $6,430 $6,752 $7,089 $7,444 $7,816 $8,207 $8,617 $9,048 168 Public Works Supervisor $6,322 $6,639 $6,971 $7,319 $7,685 $8,069 $8,473 $8,896 229 Applications Analyst II $6,298 $6,613 $6,944 $7,291 $7,655 $8,038 $8,440 $8,862 170 Water Conservation Specialist $6,292 $6,607 $6,937 $7,284 $7,648 $8,031 $8,432 $8,854 232 Management Analyst II $6,264 $6,577 $6,906 $7,251 $7,614 $7,994 $8,394 $8,814 144 Technical Services Supervisor $6,159 $6,467 $6,791 $7,130 $7,487 $7,861 $8,254 $8,667 210 Senior Housing Specialist $6,101 $6,406 $6,726 $7,062 $7,415 $7,786 $8,175 $8,584 235 Crime Analyst $5,926 $6,223 $6,534 $6,860 $7,203 $7,564 $7,942 $8,339 147 Utility Field Services Supervisor $5,809 $6,100 $6,405 $6,725 $7,061 $7,414 $7,785 $8,174 160 Facility Supervisor $5,809 $6,100 $6,405 $6,725 $7,061 $7,414 $7,785 $8,174 157 Fleet Shop Supervisor $5,809 $6,100 $6,405 $6,725 $7,061 $7,414 $7,785 $8,174 100 Wastewater Laboratory Supervisor $5,736 $6,023 $6,324 $6,640 $6,972 $7,321 $7,687 $8,071 228 Applications Analyst I $5,712 $5,998 $6,298 $6,613 $6,944 $7,291 $7,655 $8,038 213 Engineering Technician III $5,693 $5,978 $6,277 $6,591 $6,920 $7,266 $7,630 $8,011 145 NPDES Coordinator $5,642 $5,924 $6,221 $6,532 $6,858 $7,201 $7,561 $7,939 Classification 1 2 3 4 5 6 7 8
214 Personnel Analyst I $5,578 $5,857 $6,150 $6,458 $6,781 $7,120 $7,476 $7,849 237 Customer Service Supervisor $5,440 $5,712 $5,998 $6,298 $6,613 $6,943 $7,291 $7,655 Monthly Salary Rates - Salary Steps
Monthly Salary Rates - Salary Steps
REDDING INDEPENDENT EMPLOYEES ORGANZIATION
SUPERVISORY/CONFIDENTIAL UNIT
EXHIBIT "B-3"
EXEMPT EMPLOYEE SCHEDULE OF CLASSIFICATIONS AND SALARY RANGES Effective: July 21, 2024
Packet Pg. 431 Attachment: RIEO SC Exempt-July 21, 2024 (9.15(a)--Salary schedule changes for RIEO Engineers & Construction Manager) 224 Recreation Supervisor II $5,405 $5,675 $5,959 $6,257 $6,569 $6,898 $7,243 $7,605 186 Police Services Supervisor $5,271 $5,535 $5,811 $6,102 $6,407 $6,727 $7,064 $7,417 241 Office Services Supervisor $5,087 $5,341 $5,608 $5,888 $6,183 $6,492 $6,817 $7,157 193 Recreation Supervisor I $4,976 $5,224 $5,486 $5,760 $6,048 $6,350 $6,668 $7,001 217 Workflow Coordinator $4,773 $5,012 $5,262 $5,526 $5,802 $6,092 $6,397 $6,716 250 Executive Assistant to Assistant $4,484 $4,708 $4,944 $5,191 $5,450 $5,723 $6,009 $6,310 City Manager
126.00
Note: Pay rates are calculated utilizing a standardized formula and small differences may occur due to rounding.
Packet Pg. 432 Attachment: RIEO SC Exempt-July 21, 2024 (9.15(a)--Salary schedule changes for RIEO Engineers & Construction Manager)