Agenda
Regular Meeting
Redding City Council
Council Chambers
777 Cypress Avenue, Redding, CA
February 20, 2024
6:00 PM
1. CALL TO ORDER - MAYOR TENESSA AUDETTE
A. Pledge of Allegiance
B. Invocation - Reverend Marygrace Sorensen, Unity in Redding C. Roll Call
3. PUBLIC COMMENT - for non-agendized matters within the city’s jurisdiction.
4. CONSENT CALENDAR
The Consent Calendar contains items considered routine and/or which have been individually scrutinized by City Council Members and are anticipated to require no further deliberation. If a member of the public wishes to address an item on the Consent Calendar, please fill out a Speaker Request Form and submit it to the City Clerk before the Consent Calendar is considered. It shall be the prerogative of any Council Member, before the Consent Calendar is acted upon, to: (1) comment on an item; (2) respond to any public comment on an item; (3) request the record reflect an abstention or nay vote on an item; or (4) remove an item and place it on the Regular portion of the agenda for delivery of a staff report and/or an extended discussion or deliberation.
PURSUANT TO THE BROWN ACT, CITY COUNCIL CANNOT TAKE ACTION ON PUBLIC
COMMENT ITEMS
The City Council will allocate up to a maximum of three minutes per speaker for 30 minutes total, at the beginning of the meeting for Public Comment for non-agendized matters within the City’s jurisdiction.
The Mayor will determine the order of the speakers. If 30 minutes is not adequate to accommodate all of the individuals who have submitted a Speaker Request Form to the City Clerk, the Council will trail this item to the end of the open session agenda. The remaining speakers will address the City Council at that time.
If anyone wishes to address the City Council on any item considered at this meeting before or during Council’s consideration of that item, please fill out a blue Speaker Request Form, located in the lighted alcoves at the back of the Council Chambers, and submit it to the City Clerk. The City Council will allocate up to a maximum of three minutes per speaker for each agenda item. Staff reports are available on-line at the City’s web site at www.cityofredding.gov or in the Public View binder located on the podium at the north side of the Chambers.
PLEASE SILENCE YOUR CELL PHONES. THANK YOU.
Redding City Council February 20, 2024
4(b). Accept City of Redding Accounts Payable Register No. 7; and Payroll Register Nos. 14 and 15.
4.1(a). Approve construction of a joint trench crossing along Venture Pkwy for utility connections to lot 6A (5300 Venture Pkwy, Assessor’s Parcel Number 054-220- 033-000) in the Stillwater Business Park in the amount not to exceed $100,000; and authorize the City Manager, or designee, to do whatever is necessary to effectuate the work.
4.2(a). Approve the following actions relative to the State of California’s Housing and Community Development’s Community Development Block Grant - Disaster Recovery Workforce Development Program grant application:
(1) Adopt Resolution authorizing the City Manager or designee to submit the grant application and any other necessary documents to apply, accept and appropriate the grant in the amount $6,096,458;
(2) Find that applying for grant funds is not considered a project under the California Environmental Quality Act; and
(3) Find that applying for grant funds is categorically excluded, not subject to 58.5 and convert to exempt under the National Environmental Policy Act.
4.2(b). Authorize the City Manager, or designee, to execute all documents necessary to apply, accept, appropriate and implement the United States Economic Development Administration’s Public Works and Economic Adjustment Assistance Program in an amount not to exceed $3,000,000 for infrastructure improvements located in the City of Redding Stillwater Business Park.
4.2(c). Authorize and approve the following actions:
(1) Authorize the Director of Finance, or designee, to establish a General Fund commitment of fund balance for $2,458,000 for the Community Development Block Grant Section 108 Guaranteed Loan security for the South City Park Project;
(2) Direct the Director of Finance, or designee, to reduce this commitment annually by the Community Development Block Grant or other Community Development Fund principal payments; and
(3) Direct the City Manager, or designee to update the reserve policy to reflect the treatment of committed funds.
4.9(a). Approve and ratify submission of a grant application to the California Office of Traffic Safety Selective Traffic Enforcement Program in the amount of $438,563; and authorize the City Manager, or designee, to execute the grant agreement and all subsequent documents including administratively appropriating the funds if the grant is awarded.
Redding City Council February 20, 2024
4.11(a). Authorize and approve the following for the City of Redding Solid Waste Utility:
(1) Authorize the purchase of one 2024 Kenworth T380 chassis using Sourcewell contract pricing with a net delivered cost of $124,050.59 including all applicable taxes and fees;
(2) Award Bid Schedule 5441 to the apparent low bidder Interstate Assembly Systems for the purchase of one 2023 or newer Heavy Equipment Service Body with Crane (Service Body) with a net delivered cost of $192,889.13 including all applicable taxes and fees; and (3) Authorize the City Manager to approve future pricing adjustments, terms, and policy changes as needed due to inflation and unstable economic conditions up to a total of $30,000.
4.11(b). Authorize the following actions relative to Consulting and Professional Services Contract (C-5900) for the Old Alturas Road Bridge over Churn Creek Project:
(1) Approve the Fifth Amendment to the Consulting and Professional Services Contract (C-5900) with Morrison Structures, Inc., in the amount of $36,503.12, for a total not to exceed fee of $596,308.07; (2) Authorize the City Manager to execute the Amendment; and (3) Authorize the City Manager to approve additional contract amendments not to exceed $40,000.
4.11(c). Authorize and approve the following actions relative to the Summary Vacation of a portion of Twin View Boulevard (A-2022-00426):
(1) Adopt Resolution summarily vacating a portion of Twin View Boulevard adjacent to Parcel Two as shown on the Record of Survey filed in Book 43 of Land Surveys at page 59, Shasta County Records described in Exhibit A and depicted in Exhibit B;
(2) Find the action consistent with the General Plan; and (3) Find the action categorically exempt from environmental review under the California Environmental Quality Act Guidelines, pursuant to Section 15035 – Minor Alterations in Land Use Limitations.
4.11(d). Accept Bid Schedule No. 5258 (Job No. 2488), Hollow Lane Storm Drain Project, awarded to Lakmann Builders, Inc., as satisfactorily complete, with a final cost of $883,071.
4.11(e). Accept Bid Schedule No. 5222 (Job No. 7336), Redding Aquatic Center 50- Meter Pool Improvements, awarded to Western Water Features, Inc., as satisfactorily complete, with a final cost of $1,255,347.
RECOMMENDATION: ACCEPT, ACKNOWLEDGE, ADOPT, APPROVE,
AND/OR AUTHORIZE ALL ITEMS ON THE CONSENT CALENDAR.
Redding City Council February 20, 2024
9. REGULAR CALENDAR: REPORTS & COMMUNICATIONS OF DEPARTMENTS,
BOARDS, COMMISSIONS AND COMMITTEES
Assistant City Manager
9.2(d). Consider actions related to the Good News Rescue Mission's Property Purchase and development of a Day Resource Center.
Recommendation:
Approve the following actions relative to the Good News Rescue Mission’s acquisition of 3145 Veda Street (Assessor’s Parcel Number (APN) 104-620-052-000) and 3150 South Market Street (APN 104-620-059-000) for the development of a community-served day resource center:
(1) Accept the use of a broker’s opinion of value to justify the $875,000 purchase price for the subject properties;
(2) Authorize the City Manager, or designee, to negotiate and finalize a Development Funding Agreement that includes but is not limited to:
(a) Providing an Encampment Resolution Funding Program grant in an amount not-to-exceed $3,000,000 as a secured, forgivable loan with a term that begins with the issuance of a building permit and ends three years after the opening date of the day resource center operating in accordance to a City Council approved operations agreement; (b) The City Manager establishing escrow specific conditions that include: a 45-day escrow term; disbursement of acquisition funding; Phase I environmental site assessment submittals; a $20,000 contingency fund for applicable escrow extension accommodations, American Land Title Association endorsements, or other due diligence costs; and acknowledges a City of Redding approved use permit will be applied for after the close of escrow;
(c) 18-month term schedule of performance;
(d) Scope and budget for the day resource center rehabilitation project; (e) Operations agreement negotiated within 180 days; and (3) Authorize the Mayor to execute the resulting Development Funding Agreement and the associated documents; and
(4) Find that the aforementioned actions are exempt from review under the California Environmental Quality Act (CEQA) Guidelines, pursuant to Section 15061(b)(3) – Common Sense Exemption. A CEQA review will be completed as part of the use permit process once the details of the day resource center rehabilitation are defined.
Redding City Council February 20, 2024
Finance
9.10(a). Consider City of Redding Mid-Year Budget Review and Associated Resolution Recommendation:
Accept the City of Redding’s Fiscal Year 2023-24 Mid-Year Budget Report; and adopt Resolution approving and adopting the 34
th Amendment to City Budget
Resolution No. 2023-060 increasing appropriations by $1,420,600 for Fiscal Year 2023-24 and increasing appropriations by $163,800 for Fiscal Year 2024-25.
11. COUNCIL TRAVEL REPORT(S)
City Council Member attendance at conference/meetings reimbursed at City expense. {Requirement of Assembly Bill 1234}
[A-050-060]
Information Only
12. SUGGESTIONS FROM COUNCIL MEMBERS RELATIVE TO POTENTIAL TOPICS
FOR FUTURE CITY COUNCIL MEETINGS
13. ADJOURNMENT
Pursuant to the Brown Act, non-confidential materials related to an item on this agenda submitted to the City Council after distribution of the agenda packet are available for inspection during normal business hours at the Office of the City Clerk, 3rd Floor, City Hall, 777 Cypress Avenue, Redding, California.
City Council Meetings will be televised live on Shasta Community Access Channels via Charter/Spectrum Cable channel 181, and will be rerun on Thursday at 12:30 p.m. during the week in which the meeting is held. Additionally, the meeting can be viewed online at the following: https://www.shastaartscouncil.org/scactv. Video of the City Council meetings can also be viewed on the City’s web site at http://www.cityofredding.gov/. Open the Services tab, and select City Council Videos.
In compliance with Title II of the Americans with Disabilities Act, the City of Redding will make available to persons with disabilities modifications or accommodations including auxiliary aids or services necessary to participate in public meetings. A person needing assistance should contact the Redding City Clerk by telephone at (530) 225-4447 or in person, or by mail at 777 Cypress Avenue, 3rd Floor, Redding, California 96001 at least three (3) working days in advance.
The City of Redding will ensure that no person shall be excluded from participation in, denied the benefits of, or otherwise be subjected to discrimination under any of its projects, activities, services, or business opportunities on the basis of race, color, national origin, age, sex, or disability, as afforded by Title VI of the Civil Rights Act of 1964 and related statutes as amended. All persons, regardless of their citizenship status, are covered under this regulation.
Questions, complaints, or requests for accommodations or additional information may be forwarded to the ADA & Title VI Coordinator at 777 Cypress Avenue, Attn: Personnel Dept., Redding, California 96001, Phone (530) 225-4065.
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Accept City of Redding Accounts Payable Register No. 7; and Payroll Register Nos. 14 and 15.
Fiscal Impact
There is no fiscal impact to accepting the registers.
Alternative Action
The City Council could choose to not accept the registers and provide alternate direction to staff.
Background/Analysis
Attached are the Accounts Payable and Payroll Registers as follows:
Accounts Payable:
(1) Register No. 7 for the period January 1, 2024 – January 31, 2023, in the amount of $23,766,404.27.
Payroll:
(1) Register No. 14 for the period December 24, 2023 – January 06, 2024, in the amount of $5,319,989.17 and Register No. 15 for the period January 07, 2024 – January 20, 2024, in the amount of $4,921,537.06.
Environmental Review
This is not a project defined under the California Environmental Quality Act, and no further action is required.
MEETING DATE: February 20, 2024
ITEM NO. 4(b)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4(b)--City of Redding Accounts Payable and Payroll Registers.
Greg Robinett, Director of
Finance/City Treasurer
Packet Pg. 6
Report to Redding City Council February 8, 2024
Re: 4(b)--Accounts Payable and Payroll Registers Page 2 Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 Packet Pg. 7
Packet Pg. 8
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 9
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 10
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 11
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 12
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 13
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 14
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 15
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 16
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 17
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 18
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 19
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 20
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 21
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 22
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 23
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 24
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 25
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 26
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 27
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 28
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 29
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 30
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 31
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 32
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 33
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 34
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 35
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 36
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 37
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 38
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 39
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 40
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 41
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 42
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 43
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 44
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 45
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 46
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 47
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 48
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 49
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 50
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 51
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 52
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 53
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers) Packet Pg. 54
Attachment: Accounts Payable Register No. 7 and Payroll Register Nos. 14 & 15 (4(b)--Accounts Payable and Payroll Registers)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Approve construction of a joint trench crossing along Venture Pkwy for utility connections to lot 6A (5300 Venture Pkwy, Assessor’s Parcel Number 054-220-033-000) in the Stillwater Business Park in the amount not to exceed $100,000; and authorize the City Manager, or designee, to do whatever is necessary to effectuate the work.
Fiscal Impact
Sufficient funds to cover the cost of the work are available in the Stillwater Business Park Infrastructure account.
Alternative Action
City Council may choose not to approve construction of the utility joint trench or authorize the use of other City of Redding (City) funds for the joint trench work.
Background/Analysis
Lot 6 in the Stillwater Business Park was split following the completion of the infrastructure and to potentially attract more buyers to smaller lots. Lot 6A and lot 6B were created due to the lot split. In August 2023, lot 6A was sold to Redding Venture Partners LLC (developer) and the site now has an active building permit for a distribution facility.
The developer for lot 6A reached out to the City in regards to the costs they were going to incur to bring underground utilities to the subject property. The City advertises the Stillwater Business Park properties as shovel and utility ready. Due to the lot split, utility connections were not performed or considered. This left lot 6A without necessary utility connections.
MEETING DATE: February 20, 2024
ITEM NO. 4.1(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.1(a)--Approve construction of a joint trench in the Stillwater Business Park for Lot 6A
Jason Gibilisco, Management
Assistant to the City Manager
Packet Pg. 55
Report to Redding City Council February 15, 2024
Re: 4.1(a)--Approve construction of joint trench in Stillwater Business Park for Lot 6A Page 2 Various options to bring utilities to the property were explored and the most cost-effective solution is to bring utilities directly to the site through a perpendicular crossing in front of 5300 Venture Parkway. The cost estimate for the joint trench is $40,000 to $80,000. Staff will work with other utility providers such as Pacific Gas and Electric Company for the joint trench.
Completing the joint trench will assist the City with completing our Stillwater Business Park readiness and the developer with the necessary underground utilities to serve their development.
Environmental Review
On June 6, 2023, City Council determined that the Redding Electric Utility Trench and Excavation Contract and associated project activities are categorically exempt from review under the California Environmental Quality Act, pursuant to Section 15301 – Existing Facilities, Section 15302 – Replacement or Reconstruction, and Section 15303 – New Construction or Conversion of Small Structures. No further action is required.
Council Priority/ City Manager Goals
• This item is a routine agenda item
Attachments
Previous Staff Report_6-6-2023
Packet Pg. 56
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following relative to Bid Schedule No. 5365 for furnishing electric utility trench and excavation work:
(1) Award to Iron Mountain General Engineering, Inc., at the bid unit prices, for a total amount of $822,800;
(2) Authorize the City Manager, or designee, to approve contingency funding in the amount of $164,560 in addition to the awarded amount;
(3) Authorize the Electric Director to extend the bid award, if mutually agreeable with all prices, terms, and conditions remaining the same, for two additional one-year periods; and
(4) Find the project categorically exempt from review under the California Environmental Quality Act Guidelines, pursuant to Section 15301 – Existing Facilities, Section 15302 – Replacement or Reconstruction, and Section 15303 – New Construction or Conversion of Small Structures.
Fiscal Impact
Funds have been allocated within Redding Electric Utility’s (REU) General System Improvements Fiscal Year 2024-25 biennial budget to cover these costs plus the contingency.
Alternative Action
The City Council could choose not to award the bid and provide staff with alternate direction.
Background/Analysis
This is a routine bid for procurement of services to provide electric utility excavation and associated work for the period of one year after the execution of the contract. Utility excavation and related work will be performed as needed, subject to the availability of budgeted funds.
MEETING DATE: June 6, 2023
ITEM NO. 4.5(b)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.5(b)--Award Bid Schedule No. 5365, Electric Utility Trench and Excavation Nathan Aronson, Assistant
Director of Electric Utility
Packet Pg. 57
Attachment: Previous Staff Report_6-6-2023 (4.1(a)--Approve construction of joint trench in Stillwater Business Park for Lot 6A) Report to Redding City Council June 1, 2023
Re: 4.5(b)--Award Bid Schedule No. 5365, Electric Utility Trench and Excavation Page 2 Utility excavation is an ongoing need and is necessary to support residential and commercial development and to support repairs and rebuilds of existing electric utility facilities. To streamline future procurement efforts, staff recommends extending this bid award for two additional one-year terms.
On April 20, 2023, two bids were opened for utility excavation work, as shown on the attached bid tabulation form. Iron Mountain General Engineering, Inc., submitted the low bid for the evaluated total of $822,800, which complies with the specifications and general conditions. The engineer’s estimate for this bid was $717,700.
Environmental Review
Staff has determined that the project is categorically exempt from review under the California Environmental Quality Act Guidelines, per Section 15301 – Existing Facilities, Section 15302 – Replacement or Reconstruction, and Section 15303 – New Construction or Conversion of Small Structures. Class 1 exemptions include the operation, repair, maintenance, or minor alteration of existing facilities, structures, or equipment involving negligible or no expansion of use. Class 2 exemptions consist of replacement or reconstruction where the new structure will be located on the same site and will have substantially the same purpose and capacity. Class 3 exemptions consist of construction and location of new small facilities and equipment, or conversion of existing structures.
The trenching and excavation contract will support REU’s effort to maintain, replace, upgrade, and construct small new facilities and convert existing service systems. The actions will occur in previously disturbed areas, have substantially the same purpose and capacity, and result in a negligible expansion of use. The project has no potential to have a significant effect on the environment. No further actions are required.
Council Priority/City Manager Goals
This agenda item is a routine operational item.
Attachments
^Bid Tabulation
NOE REU Trench and Excavation Contract
Packet Pg. 58
Attachment: Previous Staff Report_6-6-2023 (4.1(a)--Approve construction of joint trench in Stillwater Business Park for Lot 6A)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Approve the following actions relative to the State of California’s Housing and Community Development’s Community Development Block Grant - Disaster Recovery Workforce Development Program grant application:
(1) Adopt Resolution authorizing the City Manager or designee to submit the grant application and any other necessary documents to apply, accept and appropriate the grant in the amount $6,096,458;
(2) Find that applying for grant funds is not considered a project under the California Environmental Quality Act; and
(3) Find that applying for grant funds is categorically excluded, not subject to 58.5 and convert to exempt under the National Environmental Policy Act.
Fiscal Impact
Community Development Block Grant (CDBG) Disaster Recovery (DR) Workforce Development Program funds are grant funds with no match obligation. Any awarded funds will pass through the City of Redding (City) to California Heritage Youth Build (CHYBA) to complete various workforce projects. City staff time will be paid through the grant’s activity delivery allocation in an estimated amount of $222,000. There is no impact to the General Fund.
Alternative Action
The City Council could decline to authorize submission of the application, thereby prohibiting the City’s ability to partner with CHYBA for this one-time grant funding opportunity for the community.
MEETING DATE: February 20, 2024
ITEM NO. 4.2(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.2(a)--Approval to apply for State of California Housing & Community Development CDBG-DR Workforce Development Program Funding.
Steve Bade, Assistant City
Manager
Packet Pg. 59
Report to Redding City Council February 14, 2024
Re: 4.2(a)--CDBG-DR Workforce Grant Funding Page 2
Background/Analysis
On August 4, 2018, the Federal Emergency Management Agency published DR-4382, the Presidential declaration of a major disaster for the State of California (State) in response to the devastating wildfires in Shasta and Lake Counties. During that same year, a separate disaster, DR-4407, was published for Butte, Los Angeles and Ventura Counties.
As part of the ongoing effort to assist the State with recovery from these disasters, the federal government, through the U.S. Department of Housing and Urban Development awarded CDBGDR funds to the State. These funds are being administered through the State’s Housing and Community Development Department (HCD) to assist those counties covered by DR-4382 and DR-4407. HCD undertook an extensive needs assessment to determine the specific recovery priorities for each of the affected counties. The resulting unmet recovery needs were categorized into four program areas: housing, infrastructure, economic revitalization, and planning.
As per the 2018 CDBG-DR Action Plan, HCD allocated $40,694,942 of the CDBG-DR funding to create the DR-Workforce Development Program. DR-Workforce Development projects are funded to assist with meeting the unmet workforce needs of affected communities and to address economic revitalization. Of these funds, the Shasta County region is allocated a maximum of $6,096,458 to be divided between successful applicants and projects.
This grant will provide workforce training to Shasta County through CHYBA to be used towards workforce development activities including categories such as construction trades, healthcare, emergency response, and culinary training. Additionally, they will refer clients to other workforce providers including the Shasta Builders’ Exchange, the Smart Center, and Shasta College. CHYBA will assist participants with supportive services to help trainees successfully access and participate in the workforce training program and support gainful employment. City staff will use their grant experience to apply for the grant, request payment draws and generally oversee the grant activities undertaken by CHYBA. City staff time will be paid by activity delivery from the DR-Workforce Development grant.
Should the application be awarded by HCD, upon Council approval and pursuant to the subject Resolution the City Manager would be authorized to enter into a grant agreement with HCD.
Environmental Review
Based on the facts of the record, applying for grants is not considered a project under the California Environmental Quality Act (CEQA). Furthermore, applying for grants is categorically excluded not subject to 58.5 and converts to exempt under National Environmental Protection Agency (NEPA). Upon the award of grant funds and prior to the commencement of project activities, separate CEQA and NEPA environmental reviews will be completed before any choice limiting actions occur.
Council Priority/City Manager Goals
• Government of the 21st Century - “Be relevant and proactive to the opportunities and challenges of today’s residents and workforce. Anticipate the future to make better decisions today.”
• Economic Development- “Facilitate and become a catalyst for economic development in Redding to create jobs, retain current businesses and attract new ones, and encourage investment in the community.”
Packet Pg. 60
Report to Redding City Council February 14, 2024
Re: 4.2(a)--CDBG-DR Workforce Grant Funding Page 3
Attachments
^Resolution
Packet Pg. 61
RESOLUTION NO. 2024-___
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING
APPROVING AN APPLICATION FOR FUNDING AND THE EXECUTION
OF A GRANT AGREEMENT AND ANY AMENDMENTS THERETO
FROM THE 2023-2024 FUNDING YEAR OF THE STATE CDBG-DR
RECOVERY WORKFORCE PROGRAM
BE IT RESOLVED by the City Council of the City of Redding as follows:
Section 1:
The City Council has reviewed and hereby approves the submission to the State of California of one or more application(s) in the aggregate amount, not to exceed, of $6,096,458 for the following CDBG-DR activities, pursuant to the March 2023 CDBG-DR NOFA:
Activity Dollar Amount Being Request for the Activity
Preliminary Activities $121,000
Workforce Development $2,428,420
Supportive Services $612,738
Facilities $2,384,300
Grant administration and Reporting $550,000
Section 2:
The City Council acknowledges compliance with all state and federal public participation requirements in the development of its application(s).
Section 3:
The City Council hereby authorizes and directs the City Manager, or designee, to execute and deliver all applications and act on the City Council’s behalf in all matters pertaining to all such applications.
Section 4:
If an application is approved, the City Manager, or designee, is authorized to enter into, execute and deliver the grant agreement (i.e., Standard Agreement) and any and all subsequent amendments thereto with the State of California for the purposes of the grant.
Section 5:
If an application is approved, the City Manager, or designee, is authorized to sign and submit Funds Requests and all required reporting forms and other documentation as may be required by the State of California from time to time in connection with the grant.
Packet Pg. 62
Attachment: ^Resolution (4.2(a)--CDBG-DR Workforce Grant Funding) I HEREBY CERTIFY that the foregoing resolution was introduced at a regular meeting of the City Council of the City of Redding on the 20th day of February, 2024, and was duly adopted at said meeting by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
___________________________________
TENESSA AUDETTE, Mayor
ATTEST: FORM APPROVED:
___________________________________ ___________________________________ SHARLENE TIPTON, City Clerk CHRISTIAN M. CURTIS, City Attorney
STATE OF CALIFORNIA
City of Redding
I, Sharlene Tipton, City Clerk of the City of Redding, State of California, hereby certify the above and foregoing to be a full, true and correct copy of a resolution adopted at a duly noticed and convened meeting of said City Council on February 20, 2024, and that such resolution has not been amended, modified, repealed or rescinded since its date of adoption and is in full force and effect as of the date hereof.
__________________________________________
Sharlene Tipton, City Clerk of the City of Redding,
State of California
By: ______________________________________
Name and Title
Packet Pg. 63
Attachment: ^Resolution (4.2(a)--CDBG-DR Workforce Grant Funding)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the City Manager, or designee, to execute all documents necessary to apply, accept, appropriate and implement the United States Economic Development Administration’s Public Works and Economic Adjustment Assistance Program in an amount not to exceed $3,000,000 for infrastructure improvements located in the City of Redding Stillwater Business Park.
Fiscal Impact
Authorizing a grant application to the United States Economic Development Administration’s (EDA) Public Works and Economic Adjustment Assistance (PWEAA) Program may result in a grant award of up to $3,000,000 with at least 50 percent required from local matching funds.
Median household income, poverty indicators, indicators of economic distress, and disadvantaged community statuses may reduce the required local match to a 20 percent minimum. Matching funds may be cash, loans, bonds or in-kind and shall be unencumbered, unrestricted and committed at the time of award. Staff endeavors to provide match in the form of cash from Stillwater Business Park property sales and will bring back a final match plan to City Council (Council) prior to accepting the grant. It is estimated that the Stillwater Business Park Phase 2A project cost is $6,000,000.
Alternative Action
The Council may choose to not authorize a grant application to the EDA PWEAA Program. This action would require staff to identify alternative funding sources to assist with the Stillwater Business Park infrastructure development.
MEETING DATE: February 20, 2024
ITEM NO. 4.2(b)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.2(b)--Grant Application - Economic Development Administration Steve Bade, Assistant City
Manager
Packet Pg. 64
Report to Redding City Council February 14, 2024
Re: 4.2(b)--Grant Application - Economic Development Administration Page 2 Background/Analysis
The EDA is an agency of the United States Department of Commerce that administers programs that are intended to boost economic development as measured by job creation and retention. The PWEAA Program offers funding to projects that align with regional economic plans and are expected to create or retain high-quality, well-paying jobs. The PWEAA also recognizes the roles that infrastructure and public works facilities can play in economic development at the regional and local levels. Public works projects that serve to provide economic access are eligible for investment from the EDA as jobs are created by improving workforce access or commercial development in a given area, and each is scored by its alignment with regional economic planning efforts.
On November 16, 2021, Council approved the Stillwater Business Park Phase 2 (Stillwater Phase 2) Project in the amount of $1.5 million. This project funded specific consultant costs needed to plan and design the infrastructure improvements for the Stillwater Phase 2 Project as well as staff costs related to project development that encompasses surveys, environmental clearance, right of way acquisitions with appraisals and design work for road construction, wet and dry utilities installation, storm drains, street lights and other necessary items. Infrastructure improvements for the Stillwater Phase 2 Project include improvements from Old Oregon Trail through the Park on Venture Parkway and concludes at the intersection of Fig Tree Lane and Airport Road. As part of this project, Dokken Engineering was contracted to provide 100 percent plans for the Stillwater Phase 2 Project.
Funding for the development of the Stillwater Phase 2 infrastructure improvements is presently being compiled by staff. In an effort to source funding for the infrastructure improvements, staff wishes to apply to the EDA for PWEAA grant funds to construct the infrastructure. However, since only limited funds are available for the PWEAA grant, the PWEAA grant application will not be for the entire Stillwater Phase 2 Project, but for a portion of the Project from the current cul-de-sac terminus of Venture Parkway, south to the second bridge that crosses Stillwater Creek, resulting in a partial construction phase of approximately one mile. These frontage improvements would start from lot 12 and end at the City of Redding lot, adjacent to lot 16 wherein Redding Electric Utility will be building a future substation.
The estimated construction cost for Stillwater Phase 2A of the project is $6 million. The maximum EDA PWEAA grant program limit is $5 million per project and grant advisors recommended submitting applications in the $3 million range to have better success outcomes.
Therefore, assuming a 50 percent match, the requested EDA PWEAA grant will be for $3 million.
Environmental Review
Applying for grant funds is not considered a project under the California Environmental Quality Act (CEQA). The construction phase of the project is presently being reviewed for CEQA and National Environmental Policy Act compliance.
Council Priority/City Manager Goals
• Economic Development - “Facilitate and become a catalyst for economic development in Redding to create jobs, retain current businesses and attract new ones, and encourage investment in the community.
Packet Pg. 65
Report to Redding City Council February 14, 2024
Re: 4.2(b)--Grant Application - Economic Development Administration Page 3 Attachments
Previous Staff Report - November 16, 2021
Packet Pg. 66
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize staff to develop a Request for Proposal for the design of infrastructure improvements for the Stillwater Business Park Phase 2 Project; and adopt Resolution approving and adopting the 19th Amendment to City of Redding Budget Resolution No. 2021-078 appropriating $1,500,000 for said purpose.
Fiscal Impact
The Stillwater Business Park Phase 2 Project is being funded by the General Fund. The attached budget resolution in the amount of $1,500,000 will fund ongoing project development costs for this project to ensure delivery timelines for prospective tenants. The General Fund has previous property sales to cover $650,000 of the projected cost, while the remaining amount is expected to be realized through near term property sales. The funding source of the construction of the necessary improvements has not yet been determined.
Alternative Action
The City Council (Council) may choose to not authorize funding for the design of Stillwater Business Park Phase 2 Project and provide staff with alternative direction. Without this project, the City of Redding (City) will not fulfill its obligation of providing a completed business park to its tenants. As developer, the City is responsible for providing adequate roadways, utilities, and various other infrastructure improvements to ensure the business park is useable for current and future tenants.
MEETING DATE: November 16, 2021
ITEM NO. 4.11(g)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(g)--Stillwater Business Park Phase 2 Infrastructure Improvement Project Chuck Aukland, Public
Works Director
Packet Pg. 67
Attachment: Previous Staff Report - November 16, 2021 (4.2(b)--Grant Application - Economic Development Administration) Report to Redding City Council November 12, 2021
Re: 4.11(g)--Stillwater Business Park Phase 2 Infrastructure Improvement Project Page 2 Background/Analysis
The City is responsible for infrastructure improvements at Stillwater Business Park, including street lights, paving, landscaping, and utility installation. At the mid-year budget review in February 2021, the Council approved an allocation of $500,000 out of the proceeds from land sales to fund the design of the infrastructure improvements at the Park.
In August 2021, the Council approved the appropriation of $150,000 for the construction bid for Phase 1C of this project that included the installation of street lighting on Venture Parkway from the Stillwater Business Park entrance at Old Oregon Trail through the east side of the northerly Stillwater Creek Bridge.
To continue the necessary road extension and utility work, staff is recommending an increase in project budget funds from the General Fund Capital Project Fund in the amount of $1,500,000.
This additional allocation is needed for staff and consultant costs related to project development including but not limited to surveys, design, environmental clearance, and right of way acquisitions with appraisals for the remainder of the improvements. The design work will include road construction, wet and dry utility installation, storm drains, street lights and other miscellaneous items to complete improvements to Venture Parkway from Rancho Road through the south end of the park to Fig Tree Lane concluding at the intersection of Fig Tree Lane and Airport Road. The work will include widening projects along Rancho Road and Fig Tree Lane and intersection improvements that may include Rancho Road/Airport Road and also Fig Tree Lane/Airport Road.
With the sale of additional lots, the improvements which were halted need to resume in order to adhere to what was intended with the development of the park. This additional allocation will be funded with property sales receipts. Property sales in this fiscal year are in excess of $900,000, and it is anticipated that this fiscal year will see an additional $3 million in proceeds from additional land transactions. Additional work on the park will be budgeted for completion in the coming months.
Council Priority/City Manager Goals
• Public Safety – “Work to improve all aspects of public safety to help people feel secure and safe where they live, work, and play in the City of Redding.” • Economic Development – “Facilitate and become a catalyst for economic development in Redding to create jobs, retain current businesses and attract new ones, and encourage investment in the community.”
Attachments
Resolution
Vicinity Map Exhibit 1
Previous Staff Reports - 08-03-21 and 02-16-21 (available online) Packet Pg. 68
Attachment: Previous Staff Report - November 16, 2021 (4.2(b)--Grant Application - Economic Development Administration)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize and approve the following actions:
(1) Authorize the Director of Finance, or designee, to establish a General Fund commitment of fund balance for $2,458,000 for the Community Development Block Grant Section 108 Guaranteed Loan security for the South City Park Project; (2) Direct the Director of Finance, or designee, to reduce this commitment annually by the Community Development Block Grant or other Community Development Fund principal payments; and
(3) Direct the City Manager, or designee to update the reserve policy to reflect the treatment of committed funds.
Fiscal Impact
The proposed amount of funds approved by City Council (Council) to be borrowed from the United States Department of Housing and Urban Development (HUD) under the Community Development Block Grant (CDBG) Section 108 Loan Guarantee Program (Section 108) is $2,458,000 for the South City Park Project (Project). These funds would remain untouched unless the Federal Government ceases to fund the CDBG program.
Since CDBG funds will be used to repay the Section 108 loan, the first annual commitment of CDBG funds received will be paid towards this loan. Annually, other CDBG activities would be funded out of the remainder of the CDBG grant.
Alternative Action
The Council may choose to not approve staff’s recommendation and provide alternate direction to staff.
MEETING DATE: February 20, 2024
ITEM NO. 4.2(c)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.2(c)--Consider establishing a General Fund commitment of fund balance for the Community Development Block Grant Section 108 Guaranteed Loan security.
Steve Bade, Assistant City
Manager
Packet Pg. 69
Report to Redding City Council February 15, 2024
Re: 4.2(c)--City of Redding General Fund commitment of fund balance Page 2 Background/Analysis
On November 7, 2023, Council Adopted Resolution 2023-108 accepting a Section 108 Program Loan, pledging the City of Redding’s (City) general fund ($240,000) as security, and authorized the City Manager to execute a HUD Section 108 contract, note, and any other related documents pertaining to the loan. The General Fund commitment replaces this requirement.
Although the City’s obligation as borrower to make payments under the Section 108 Contract shall be payable first from CDBG funds, the General Fund is pledged as security in support of all obligations of the City as borrower under any notes executed by the City up to the amount of HUD's commitment for Section 108 Loan Guarantee Assistance.
Under California law, the Council cannot obligate future revenues without two-thirds of the voters of the public entity. Council can commit current resources through administrative action in order to establish a commitment of current available funds. This commitment will provide only collateral for the Section 108 loan obligation.
The risk to the City’s General Fund is low as the City has been an entitlement jurisdiction, receiving annual CDBG funding allocations, for more than 40 years. In the last five years, the annual entitlement grant has averaged $737,400. The annual loan payments are estimated to be under $240,000.
Once the General Fund commitment of funds balance is approved, the City Manager will execute and return the Section 108 Loan agreement and associated documents back to HUD for signature.
The General Fund balance is the difference between total assets, total liabilities and deferred inflows of resources. Whereas, the City’s cash reserve is the minimum cash balance maintained.
This General Fund commitment is committing available cash, if needed, for the payment of the loan. Since this is unlikely to occur the reserve policy will need to be updated to reflect the treatment of this type of commitment when computing the cash reserve.
Environmental Review
Applying for and accepting funding is not considered a project under the California Environmental Quality Act.
Under the National Environmental Policy Act (NEPA), administrative and management activities such as applying for and accepting funding are considered exempt activities.
Site specific environmental studies are in progress for South City Park Redevelopment Project, and a NEPA determination will be made prior to receiving Section 108 loan funds.
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
Resolution 2023-108
Packet Pg. 70
RESOLUTION NO. 2023-108
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING ACCEPTING A SECTION 108 GUARANTEED LOAN UNDER SECTION
108 OF THE HOUSING AND COMMUNITY DEVELOPMENT ACT OF
1974, AS AMENDED, PLEDGING THE CITY OF REDDING'S GENERAL
FUND AS SECURITY, AND AUTHORIZING BARRY TIPPIN, CITY
MANAGER, TO EXECUTE A HUD SECTION 108 LOAN GUARANTEE
CONTRACT, NOTE, AND RELATED DOCUMENTS CONTAINING
THAT PLEDGE
WHEREAS, The City of Redding City Council, by Resolution No. 2022-085 authorized the City Manager to execute all necessary documents or contracts as might be required by the U.S. Department of Housing and Urban Development ("HUD") as support of a loan in the amount of an application for a $3,737,000 Section 108 Loan Guarantee for Block 7 Infrastructure Project and Downtown Facade Improvement Program; and
WHEREAS, the Block 7 Infrastructure project used American Rescue Plan Act (ARP A) funds instead of Section 108 Loan Guarantee funds as previously contemplated under Resolution No. 2022-085; and the South City Park Renovation project will now use the Section 108 Loan Guarantee proceeds, with an adjusted amount of $2,458,000, for the South City Park Renovation project; and
WHEREAS, said resolution is hereby incorporated herein by reference; and WHEREAS, California Government Code sections 37103 and 53060 authorize cities to enter into agreements, including loan agreements, with the United States or any agency or department thereof for any lawful public purpose; and
WHEREAS, City of Redding has successfully obtained a commitment in the amount of $2,458,000 from HUD for the Loan Guarantee; and
WHEREAS, HUD's guarantee of the Note will be governed by a Contract for Loan Guarantee Assistance under Section 108 between the City and HUD (the "Contract"), in which this Resolution is incorporated herein by reference, and in which the City pledges Community Development Block Grants pursuant to 24 CFR 570.705(b)(2) and City of Redding' General Fund for the repayment thereof:
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Redding as follows:
Section 1. The City Council hereby authorizes and directs the City Manager to execute any and all documents necessary to accept the loan guarantee referenced above and any subsequent notes.
Packet Pg. 71
Attachment: Resolution 2023-108 (4.2(c)--City of Redding General Fund commitment of fund balance) Section 2. The Note constitutes a general indebtedness of the City and is payable from any money as is lawfully available and authorized or pledged by the City for the payment of principal of and interest on the Note, including but not limited to CDBG block grant funds pledged by the Borrower pursuant to 24 CFR 570.705(b)(2). For as long as the Note is outstanding, the City irrevocably pledges that it shall, in the manner provided by law within the constitutional and statutory limitations provided by law without the assent of the voters, make the prompt payment of principal and interest on the Note as the same shall become due. The obligation of the City as Borrower to make payments under the Contract shall be payable first from CDBG block grant funds pledged by the Borrower pursuant to 24 CFR 570.705(b)(2).
Section 3. The City Council hereby irrevocably pledges CDBG block grant funds pledged by the Borrower pursuant to 24 CFR 570.705(b)(2) and the General Fund in support of all obligations of the City as Borrower under any notes executed by the City, up to the amount of HUD's commitment for Section 108 Loan Guarantee Assistance, evidencing the Section 108 guaranteed loan for the City's South City Park Redevelopment Plan pursuant to paragraph 15 of the related Contract for Section 108 Loan Guarantee Assistance between the City and HUD. This pledge shall be enforceable in mandamus against the City.
Section 4. The provisions of this resolution are declared to be separate and severable. If a court of competent jurisdiction, all appeals having been exhausted or all appeal periods having run, finds any provision of this resolution to be invalid or unenforceable as to any person or circumstance, such offending provision shall, if feasible, be deemed to be modified to be within the limits of enforceability or validity. However, if the offending provision cannot be so modified, it shall be null and void with respect to the particular person or circumstance, and all other provisions of this resolution in all other respects, and the offending provision with respect to all other persons and all other circumstances, shall remain valid and enforceable.
I HEREBY CERTIFY that the foregoing resolution was introduced at a regular meeting of the City Council of the City of Redding on the 7th day of November, 2023, and was duly adopted at said meeting by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
COUNCIL MEMBERS: Audette, Mezzano, Munns, and Winter
COUNCIL MEMBERS: Dacquisto
COUNCIL MEMBERS: None
COUNCIL MEMBERS: None
FORM APPROVED:
Packet Pg. 72
Attachment: Resolution 2023-108 (4.2(c)--City of Redding General Fund commitment of fund balance)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Approve and ratify submission of a grant application to the California Office of Traffic Safety Selective Traffic Enforcement Program in the amount of $438,563; and authorize the City Manager, or designee, to execute the grant agreement and all subsequent documents including administratively appropriating the funds if the grant is awarded.
Fiscal Impact
This California Office of Traffic Safety (OTS) Selective Traffic Enforcement Program grant does not require matching funds. There is no negative fiscal impact in accepting this grant.
Alternative Action
The City Council could choose not to ratify the grant application. The Redding Police Department (RPD) would lose the opportunity to focus additional efforts toward traffic enforcement.
Background/Analysis
On January 31, 2024, RPD submitted an OTS Selective Traffic Enforcement Program application for its 2024 funding year, which begins October 1, 2024. RPD requested funding for the Selective Traffic Enforcement Program to hire a dedicated Driving Under the Influence (DUI) Officer, increase traffic safety enforcement, and to purchase a traffic crash database system, in the amount of $438,563.
The DUI Officer will be dedicated to working DUI enforcement at night and during the weekends. The grant will fund overtime for the following traffic enforcement activities:
enforcing speed limits, deterring aggressive driving, conducting DUI checkpoints, saturation patrols, motorcycle enforcement, and bicycle/pedestrian enforcement. This year, the grant is MEETING DATE: February 20, 2024
ITEM NO. 4.9(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.9(a)--Ratify Office of Traffic Safety Grant Application and Authorize City Manager to Execute necessary documents if grant is awarded Brian Barner, Chief of Police
Packet Pg. 73
Report to Redding City Council February 14, 2024
Re: 4.9(a)--Ratify Office of Traffic Safety Grant Application Page 2 providing an opportunity for funding for community outreach and education. Overtime funding has been requested for officers to provide education to the citizens through RPD’s Citizen’s Academy and to hold “Coffee with a Cop” events. These operations will provide the opportunity for citizens to interact with RPD and to have a better understanding of how traffic issues impact the community. Additionally, funds have been requested for training, and checkpoint supplies as well as a traffic crash database system. This equipment will allow for the vehicle data to be downloaded to help determine causes of crashes and can help in prosecution. This is a one-year grant lasting from October 1, 2024, through September 30, 2025.
Environmental Review
Ratifying the grant application is not a project as defined by the California Environmental Quality Act, therefore, no further action is required at this time.
Council Priority/City Manager Goals
• Public Safety – “Work to improve all aspects of public safety to help people feel secure and safe where they live, work, and play in the City of Redding.” Attachments
Completed grant application
Packet Pg. 74
Application :: Page 1 of 21
1. 2.
3. 4.
Application Information
Application No: 25-005772
Application Type: STEP Agency (City or
County): Redding
Department
(Police
Dept, DA
Office, etc):
Redding
Police
Department
Authorized
Representative: Brian Barner DUNS/SAMNumber: XL3JUNNVFLL9
DUNS/SAM
Expiration
Date:
4/12/2024
DUNS/SAM
Registered Address:
777 Cypress
Avenue DUNS/SAM City: Redding DUNS/SAMZIP+4: 96001-2718 Application Summary
Grants Made Easy Application Titles and Descriptions are pre-populated. For General Grants, provide the Application Title and Application Description.
Application Title:
Selective Traffic Enforcement Program (STEP)
Application Description:
Best practice strategies will be conducted to reduce the number of persons killed and injured in crashes involving alcohol and other primary crash factors. The funded strategies may include impaired driving enforcement, enforcement operations focusing on primary crash factors, distracted driving, night-time seat belt enforcement, special enforcement operations encouraging motorcycle safety, enforcement and public awareness in areas with a high number of bicycle and pedestrian crashes, and educational programs. These strategies are designed to earn media attention thus enhancing the overall deterrent effect.
Problem Statement
Describe the problem(s) to be addressed by providing the following:
Describe the city, county, or jurisdiction this grant will impact.
Describe the problem(s) to addressed, supported by current and relevant crash data. (most recent calendar year data/stats)
Define the target population the grant intends to serve and how they are affected by the problem(s).
Do not include state or national information.
Packet Pg. 75
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 2 of 21
Problem Statement:
In calendar year of 2023, the Redding Police Department (RPD) became fully staffed with 122 sworn officers. Of these 122 sworn officers, 55 officers are assigned to the Field Operations Division and responsible for day to day patrol operations, to include proactive field enforcement. Of the 55 sworn patrol officers, over fifty percent are in the range of one to five years of patrol experience. RPD has always had an expectation of its sworn staff to conduct proactive enforcement within our community, specifically in the areas of traffic enforcement.
With the expansion of new officer positions, the experience level and training in all areas of Driving Under the Influence (DUI) laws and enforcement, Standardized Field Sobriety Tests (SFST’s), Advanced Roadside Impaired Driving Enforcement (ARIDE), Drug Recognition Expert (DRE), collision investigation, lidar/radar and report writing is crucial. While increasing sworn staff, the increase for training budgets was minimal due to costs needed for immediate equipment, vehicles and other items for increasing staff.
Training in these areas assist our newest sworn staff to be more informed, trained and ready to complete thorough and accurate reports for prosecution and court testimony.
Currently RPD is working to establish a set of POST trainings to provide to our newest sworn staff, most of which are in the areas of traffic enforcement and traffic related investigations. While RPD is working with SHIELD, a Public Safety Training Center located in Redding, to schedule trainings in far northern portion of the state, it remains a challenge. With the challenge to find traffic related trainings in the local community, its crucial to send some of the sworn staff to other locations to receive these much needed and imperative trainings.
The RPD Traffic Unit currently has four sworn officers, one community service officer and one parking enforcement officer. The primary job duty of the community service officer is to handle abandoned vehicle complaints throughout the city. The primary job duties of the parking enforcement officer are to enforce parking regulations throughout the City of Redding. The four Traffic Unit Officers and one Supervisor are responsible for the investigation of all major injury and fatal traffic collisions, special event planning, OTS grant coordination, field training new officers and community service officers and general traffic enforcement. This is the first time in numerous years that the Traffic Unit has been brought to full staffing including its non-sworn staff, however the Traffic Unit does not have a full time sworn officer for the purposes of DUI enforcement, which was a portion of the unit in years past.
RPD has continued to build a close working relationship with allied law enforcement partners to include the Anderson Police Department, Shasta County Sheriff’s Department, CHP-Redding and the Shasta County District Attorney’s Office. These relationships allow a concerted effort to combat impaired driving on all of our community roadways, and assistance with major injury/fatal collision investigations.
During the calendar year of 2023, the Traffic Unit responded to nine major injury/fatal traffic collisions. Of the nine investigated collisions, six involved intoxicated drivers, to include alcohol and/or narcotic substances. One of these collisions has led to a murder charge under the Watson Rule Admonishment, the second prosecution of this severity in recent years. Of these six collisions, two were solo vehicle collisions where the driver was killed as a result of the collision.
In calendar year of 2022, the Traffic Unit responded to thirteen major injury/fatal traffic collisions, with only two involving driving under the influence of alcohol. In 2021, the Traffic Unit responded to eleven major injury/fatal traffic collision with only two involving intoxicated drivers.
Packet Pg. 76
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 3 of 21
Even though the major injury/fatal traffic collisions decreased in 2023, the number of drivers impaired by alcohol and/or drugs increased dramatically. In comparing the number of major injury/fatal traffic collisions from 2021 to 2023, the progress of reducing major injury/fatal traffic collisions can be viewed as being successful, however the increase of impaired drivers shows that there is a problem with impaired drivers on our local roadways. This increase in impaired drivers has also been found during day time traffic collisions, which are involving drivers being under the influence of narcotic substances and prescription medications.
Through the 2020-21 grant cycle, RPD had one officer funded through the Office of Traffic Safety STEP Grant for DUI enforcement. The position was eliminated due to lack of grant funding and low staffing levels for the department. When the position was funded, the DUI Specialist was responsible for making 235 DUI arrests, while 223 arrests were made from Field Operations sworn personnel. During this time the DUI Specialist was responsible for proactive enforcement of impaired drivers, assisted with collision investigations involving impaired drivers, was involved with the attending “A Sobering Choice Coalition” meetings, and was the field training officer for new hired sworn personnel. Losing the grant funded DUI Specialist position has shown that the lack of continued proactive DUI enforcement leads to more impaired drivers and collisions involving impaired drivers. Since fiscal year of 2021-2022 the RPD has seen a decrease in the number of DUI arrests made and an increase in DUI related traffic collisions. It is the goal of RPD to increase the number of trained officers in the areas of impaired driving detection (DUI) and arrests to help reduce the number of DUI related collisions and deaths, as well as impaired drivers in the community.
In 2022, Field Operations personnel were responsible for making 356 DUI arrests, compared to 345 arrests made in 2023. Of the DUI arrests made in 2022, 12 were for 23152(c), 42 for 23152(f), and 12 for 23152(g). In 2023, officers arrested 2 for 23152(c), 37 for 23152(f) and 4 for 23152(g). During 2023, a majority of the Field Operations personnel were busy training newly hired officers, with limited time focused on proactive enforcement efforts. During the 2023 year the overall DUI arrests decreased from 2022. The decrease of arrests involving drug impaired drivers could be contributed to new officers with minimal training or exposure to drug impaired drivers. In 2023, the Traffic Unit found an increase in drug impaired drivers involved in major injury/fatal traffic collisions.
RPD continues to perform OTS funded overtime enforcement and have met a majority of the goals and objectives for the 2022-2023 grant period. It is anticipated that the all the goals for 2023-2024 will be met with the addition of officers. Currently, four traffic officers and one sergeant are responsible for investigating all major injury and fatal traffic collisions. In addition to those duties, the traffic unit and officers are responsible for planning all major special events for the City of Redding, OTS grant coordination, field training for all new hires, educational presentations throughout the community and general traffic enforcement. It is the primary goal of RPD Traffic Unit to reduce the number of fatal traffic collisions from the previous year, with the specific focus to lower the number of major injury / fatal collisions involving impaired drivers.
RPD responded to a high call volume of 102,890 calls for service in 2023. Calls for service can impact and limit the time available for staff to conduct proactive traffic enforcement, specifically for impaired driving. Less proactive enforcement results in fewer DUI and traffic enforcement in areas that are prone to traffic collisions. A higher call volume also affects the ability for officers to respond to neighborhood speed complaints and deal with habitual traffic offenders.
In order to obtain goals of lowering the major injury/fatal collisions, impaired driving, traffic collisions involving pedestrians, motorcyclists, and bicyclists, educating the public is a key and efficient tool. Currently, RPD interacts with its community members via Packet Pg. 77
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 4 of 21
social media platforms and special interest group community meetings. RPD believes in working with the community to help solve problems, to include traffic complaints and concerns. While social media is a great way to help educate and inform the public and community members, the ability to talk with community members one on one and in person is more effective, and helps develop community trust and partnership.
It is also important to complete thorough investigations and provide the best evidence for successful prosecutions involving major injury/fatal traffic collisions. Successful prosecutions on dangerous driving behaviors can be one factor in helping educating and changing dangerous driving behaviors. Currently, most of this evidence is from witness statements, video surveillance, toxicology reports, vehicle diagrams, photographs and scene diagrams. Vehicle speed, braking and pre-collision vehicle factors are just as vital in providing factual speeds and braking information, which are often major factors in most collisions. This information is found in digital format in a vast majority of vehicles on the roadway, in our community. In order to obtain this information special equipment and training is needed to obtain and interpret the information.
Currently, the RPD Traffic Unit works with CHP MAIT from the Northern Division to obtain evidentiary evidence stored in the Vehicle Airbag Modules, utilizing the Bosch CD-R 900 Kit. In order to obtain assistance from CHP MAIT, a formal request has to be made via the administration, which could take several hours or days. Once the request for assistance is approved the next step is to provide CHP MAIT copies of reports, photographs and videos to review. Upon providing this information CHP MAIT provides a time that they are available, which can be within days or weeks. This availability is based on CHP MAIT’s schedule and on-going investigations. While RPD is thankful for its partnership and working relationship with CHP MAIT, the time frames to obtain this information can sometimes be detrimental to court proceedings. The best practice during investigations is to obtain evidence as soon as possible, and in order to prevent the loss of information/evidence or the ability to obtain this information/evidence. The Packet Pg. 78
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 5 of 21
Traffic Unit could improve efficiency in collecting information by utilizing their own data collection tool.
Traffic Data Summary:
City Applicants: Complete the table below using the most current local data and update the 20XX years in the table (do not use the OTS Rankings or SWITRS).
County or State Applicants: Complete the table below using SWITRS data and update the 20XX years in the table.
Crash
Type 2021 2022 2023
Crashes Victims Crashes Victims Crashes Victims
Fatal 12 12 7 7 7 7
Injury 325 440 377 484 354 489
Fatal Injury Killed Injured Fatal Injury Killed Injured Fatal Injury Killed Injured Alcohol -
Involved 0 23 0 28 1 29 1 34 2 14 2 21
Hit & Run 1 19 1 21 0 24 0 26 0 23 0 25
Nighttime
(2100-0259
hours)
1 20 1 20 2 36 2 42 2 26 2 31
Top 3 Primary Crash Factors Fatal Injury Killed Injured #1 - 22350 VC - Unsafe Speed 0 49 0 70
#2 - 21453(A) VC - Fail to stop at red light 50 0 58
#3 - 21801(A) VC Fail to Yield before left/u-turn 1 30 1 33 Proposed Solution
Equity:
The Redding Police Department (RPD) values equity within the agency and our community. Redding Police Officers are held to a strict policy of policing equitably and fairly. Redding Police Officers are required to receive mandated training from California Peace Officer Standards and Training (POST). RPD has a specific policy that addresses Bias Based Policing and officers are held accountable for their actions and expected to conduct enforcement and general policing in a fairly. It is RPD’s mission to maintain this same accountability during any grant operation. Officers assigned to grant operations will be reminded of department policy regarding Bias Based Policing.
Strategies:
The Redding Police Department (RPD) will utilize all aspects of the anticipated OTS grant in a concerted effort to reduce traffic collisions and improve traffic safety within the City of Redding. RPD will continue to collaborate with the Anderson Police Department, Shasta County Sheriff’s Office, and Redding area California Highway Patrol (CHP) by conducting highly visible DUI enforcements, DUI checkpoints, traffic enforcement operations, and public safety presentations. This would be in an effort to reduce the number of persons injured or killed in traffic collisions. These operations will be shared Packet Pg. 79
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 6 of 21
through the social media platforms of RPD and other participating agencies. These operations can also be discussed with community members through “Coffee with a Cop” programs and Citizen Academies.
The City of Anderson Police Department and Shasta County Sheriff’s Department had received OTS STEP grants for the fiscal year 2022-2023. RPD worked with both Anderson Police Department, Shasta County Sheriff’s Department and CHP-Redding to conduct four collaborative DUI Checkpoints in Anderson, Redding and City of Shasta Lake. Currently in this grant cycle, all agencies participated in collaborative DUI Saturation Patrols during the holiday season. RPD has mentored Anderson Police Department to get their traffic program up and running, including collision investigations, special event operations and traffic enforcement.
RPD looks forward to working with our allied agencies in the areas of DUI and traffic enforcement and education, with the goal of reducing DUIs and traffic collisions within our communities.
RPD is requesting funding for a full-time DUI officer. The addition of a DUI Specialist working nights, Wednesday through Saturday would be able to assist beat patrol officers by allowing them to handle calls for service in a timely manner and remain proactive in between calls. As an example, the DUI Specialist would be able to handle the DUI portion at the termination of a vehicle pursuit that involved a traffic collision. Additionally, the vast majority of our current patrol staff lack the training and time to conduct in depth DRE evaluations or complex DUI collision investigations. The DUI Specialist would be available on a call-out basis for any major injury/fatal traffic collision, or complex investigations.
The DUI Specialist also would work closely with the Shasta County District Attorney’s Office and be actively involved in the Victim Impact Panel. The Victim Impact Panel is a required attendance for any convicted impaired driver in Shasta County. The prior DUI Specialist was also DRE certified, a SFST instructor, field training officer, and was responsible for training new sworn officers in impaired driving. This is a required one-week training provided to all new sworn personnel and helps them gain experience and confidence to go forward and be proactive in impaired driving enforcement and arrests.
DUI saturation patrols have become an essential function for RPD in an effort to combat DUI driving and collisions. Saturation patrols increase DUI patrol presence and can help deter DUI driving behaviors. DUI Saturation patrols could be utilized on nights that a DUI Specialist is not working or in support of the DUI specialist to create a more effective presence. Saturation patrols can also be used on planned special event nights to help with proactive enforcement. These operations are scheduled during City of Redding major events, Kool April Nites, Redding Rodeo, Freedom Festival and Big Bike Weekend. DUI Saturation Patrols are also utilized during holidays and major sporting events such as the Super Bowl.
OTS funded DUI checkpoints are used in conjunction with saturation patrols, and conducted in areas throughout the City of Redding with high visibility and known DUI activity, and major injury/collision locations. Social media has been a proactive and important tool that is utilized by the RPD to assist in notifying, educating and informing the public the dangers of driving while intoxicated. While some of our checkpoints have resulted in DUI arrests and citations for unlicensed and suspended drivers, the true success of these checkpoints can be measured by the number of citizens that have been contacted and educated on the dangers of impaired driving in our community.
Shasta County has continued to see a significant number of people who are failing to appear in court. These failures to appear create a backlog for the over-burdened judicial system, from officers having to issue offenders citations for a new court date or Packet Pg. 80
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 7 of 21
transporting them to jail for booking. All of this creates an additional strain and burden on patrol and jail staff. Recently the Shasta County Sheriff’s Department has added additional jail space allowing for offenders to be held in custody. A pre-existing program for apprehending chronic offenders has been re-established and could be utilized for holding repeat DUI offenders or serious traffic offenders accountable.
Warrant sweeps and surveillance operations provide additional overtime to assign officers to locate violators who are failing to appear. This is effective because officers can work hours when violators are most likely to be found at their residences. The warrant sweep and surveillance operations are publicized through RPD social media platforms, and can encourage violators to appear in court as required. Warrant sweeps and court sting operations work hand in hand to ensure the follow through of those facing DUI or driving on suspended license charges. During the recent 2023-2024 grant cycle, RPD has received funds for warrant sweeps, which is currently being planned.
With months of ideal motorcycle riding weather, during both day and night, and miles of scenic roadways, Redding has a large number of motorcycle enthusiasts. Each year the City of Redding sees a large number of motorcycle riders utilizing the roadways within the city. It is the goal of RPD to support safe motorcycle operations by enforcing traffic laws related to motorcycles and promote driver awareness regarding sharing the road with motorcycles. During the past OTS grant cycle, RPD had an increase in motorcycle collisions and fatalities. In 2020 RPD was ranked 3 of 106 in collision involving motorcycles, and ranked 1 of 105 in 2021. With an increase in major injury / fatal traffic collisions, RPD will utilize overtime along with patrol staffing to focus on traffic enforcement efforts focused on motorcycles and reducing the amount of collisions.
With the recent addition of two additional motorcycle officers, the current RPD Traffic Unit consists of four officers, and one supervisor and will be able to focus on enforcement as a team throughout the City of Redding. RPD would also look to include collaborative enforcement with allied agencies, as well as use social media to publicize these enforcement details and provide education regarding awareness during state and nationwide traffic safety specific campaigns. This multi-facetted approach includes education through enforcement, education through social media and education through high visibility.
Distracted driving continues to be an ongoing issue with drivers in our community, including new drivers. RPD would like to continue aggressive enforcement of distracted driving during the next cycle. These enforcement details would be in the form of individual details and highly visible team efforts. Knowing that social media is the new form of receiving and relaying information, RPD has a proactive social media team, which the traffic supervisor and one traffic officer are a part of. These distracted driving details and educational material regarding distracted driving would be published through social media platforms. The RPD Traffic Unit is working with School Resource Officers to do presentations in local high schools to help educate teenage drivers on the dangers of driving while distracted, with the ultimate goal of educating the younger drivers and preventing collisions.
RPD has relied on OTS funding to assist in sending officers to critically important training such as DRE, ARIDE and SFST trainings. These trainings are vital to the agency and to the OTS grant operations in keeping veteran officers qualified and providing new officers with the tools necessary to conduct DUI investigations, and using up to date best practice procedures for successful prosecutions. This past year the RPD has hired over 30 new officers, many of them being from POST academies. These newer officers will need additional training in areas of SFST, ARIDE and DRE, beyond what they received in the POST academy and field training. This will assist them with traffic enforcement, DUI detection, enforcement and investigations. Having proficiently Packet Pg. 81
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 8 of 21
trained officers in these areas will assist the RPD in actively working towards lowering the number of DUI related collisions and fatal accidents in the City of Redding.
Officers who have attended these trainings typically return with enthusiasm and use the training effectively in the areas of DUI enforcement. Many of the new officers in the RPD are looking to have advanced training in DUI and DRE. It has remained the goal of the RPD to have a DRE certified officer available on patrol shifts. RPD has been actively recruiting from our newest patrol staff for DRE positions. We recently have several officers that have been interested in this role and have established a list for the DRE certification. This will assist in combating the recent rise in DUI cases that involve narcotic substances and combination DUI’s.
The RPD Traffic Unit plans on sending two of the four assigned officers to SFST instructor school. Having two certified SFST instructors will allow the RPD to host SFST/ARIDE training locally for the agency and the allied agencies in the area.
Recently, the SHIELD Training facility was established and provides a location for trainings to occur for public safety agencies. The SHIELD facility is sponsored by Shasta College and is a local training consortium. RPD has hosted recent POST approved classes through the SHIELD for allied agencies. RPD currently maintains a POST approved SFST lesson plan and has had two prior SFST instructors, who are no longer with the department.
RPD is requesting funding to purchase a Crash Data Retrieval (CDR) system. This past OTS grant cycle, the RPD Traffic Unit was responsible for handling nine major injury/fatal traffic collisions within in the City of Redding. Of these nine cases, three of them involved speed as a factor. Of those three cases two have a possible prosecutable factor due to the speed, along with intoxication. Recently the RPD Traffic Unit has been requesting the assistance from CHP Northern Division MAIT in conducting vehicle Crash Data Retrieval (CDR). This process is done by utilizing the Bosch CDR Tool, which is commonly used for major injury and/or fatal traffic collisions.
This tool allows crash data obtained during an event such as an airbag deployment, change of speed during an event, driver input and other factors pre-collision, during and post collision. Of this information that is obtained further information such as impact severity, steering input, accelerator input, ignition status and seatbelt status. Some of this information is crucial in collision investigations, when trying to identify injuries, use of safety equipment and pre, at and post collision vehicular mechanics. With the current change in vehicle technology, the majority of vehicles are now equipped with an anti-lock braking (ABS) system. For years, collision investigations would rely on vehicle skid marks for speed calculations, and now with the invention of ABS systems, skid marks are often times not present in major collision scenes. The pre-collision data that could be obtained from the Bosch tool could also be used to judge the accuracy of speed calculations that were obtained from physical evidence that was obtained on scene such as skid marks.
The Bosch CDR Tool can also be utilized in collisions that have no witnesses or survivors. The RPD Traffic Unit had recently worked a single vehicle fatal traffic collision where speed was an obvious factor, and if having been able to utilize this tool, things such as the driver’s pre-collision input and speed would have been documented for this collision.
Information that has been obtained from CDR data has been deemed admissible as evidence in court cases, however physical evidence, and contextual information must be utilized as well in court to prove reliability. This requirement of further evidence will provide traffic officers to continue to use all knowledge and tools in collision Packet Pg. 82
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 9 of 21
investigations available to them to provide an in-depth investigation. This will continue through the court process and provide officers the ability to testify to all factors in collision investigations that would be prudent for successful prosecutions.
A goal of the RPD Traffic Unit is to conduct thorough and consistent collision investigations, utilizing all tools necessary to provide a prosecutable case should it rise to that level. The RPD Traffic Unit works closely with the Shasta County District Attorney’s Office and prosecutors on all major injury and fatal DUI related collisions that have potential for prosecution. It is RPD’s goal to provide all evidence necessary in these investigations, and the use of the Bosch CDR Tool would allow us to obtain speed which has been a consistent factor with most recent collision investigations involving major injuries and fatalities.
RPD recognizes the importance of working with allied agencies such as CHP in the areas of enforcement and investigations, and are thankful for their assistance, however each request for this tool requires an approval from CHP MAIT command staff. If the assistance is approved, we are then tasked with scheduling around their on-going case investigations and availability. By having our own Bosch CDR Tool, the RPD Traffic Unit will be able to work major injury / fatal traffic collisions in a timely fashion. The Redding Police Traffic Unit would rely on CHP MAIT at times for questions and best practices, as it would relate in the effective use of the Bosch CDR Tool.
It is believed that by providing necessary evidence in some collision cases, the RPD and Shasta County District Attorney’s Office can better utilize the justice system to help hold serious offenders accountable in collision investigations. This accountability can also be perceived by the community as educational in the fact that prosecution is a function of accountability, and that accountability can sometimes change behaviors. In the realm of collision investigations, the goal for RPD is to reduce the number of collisions involving speed, DUI and distracted driving. Bosch is an American corporation and qualifies under the Buy American Act. This tool is utilized by several law enforcement agencies through Packet Pg. 83
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 10 of 21
the State of California and the United States.
Agency Qualifications:
Moving into the 2024-2025 grant cycle, the RPD looks forward to its continued partnership with the California Office of Traffic Safety. RPD utilizes a Management Analyst and Traffic Sergeant to execute and monitor the STEP grant to ensure grant goals are met while effectively utilizing grant money to fund traffic enforcement overtime and purchase necessary equipment. Patrol personnel, both sworn and non-sworn, work hard to complete, and in many instances exceed, all of the grant objectives in addition to their regular duties and other overtime responsibilities.
The Traffic Sergeant will continue to oversee the OTS STEP grant. The Traffic Sergeant is responsible for the day to day operations, press releases and social media posts.
Additionally, they oversee collision investigations and grant activities. The sergeant also coordinates with other allied agencies to include the Anderson Police Department, Shasta County Sheriff’s Office, CHP and non-profit organizations that share similar goals with OTS. This will be the Traffic Sergeants fourth year managing the OTS grant.
The Traffic Sergeant has received extensive training regarding the expectations and requirements in managing OTS grants. The RPD Management Analyst has over 25 years of experience working for the City of Redding managing various grants. She currently oversees the 2023-2024 OTS STEP grant. She has attended several OTS grant meetings and familiar with the OTS grant expectations and requirements.
All RPD personnel and volunteers have a comprehensive background check conducted before they participate in any department activities.
Community Collaboration and Engagement
Provide a description of the community collaboration and engagement activities that will be conducted by your department and addresses traffic safety. Community collaboration and engagement allows for the appropriate department personnel to engage in conversations to both share information and receive input from the community members regarding traffic safety.
Packet Pg. 84
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 11 of 21
Community Collaboration and Engagement:
RPD believes in a positive, proactive and working relationship with its community members and business owners. This relationship is crucial to help maintain working relationships, and keep the community safe. It has been the goal of RPD to create a program that helps build positive relationships, transparency, create better communications and trust from the community. One way to establish this relationship is to involve community members with a Citizens Academy. RPD has created a nine-week program that will involve twenty community members that have expressed interest in the program. Each weekly program will be a three-hour block in which the citizen group of twenty will be educated on a division or program of the RPD.
These blocks of training will include topics such as Traffic Operations. The twenty-person citizens group will be informed on the day to day operations of traffic officers, collision investigations, Impaired Driving Investigations, traffic enforcement stops. During this block two officers will discuss the policies, laws and procedures with the citizens group, as well as engage the group in educational discussions on these topics. The goal of these engagements is to help the community members understand the role of law enforcement and the steps and procedures conducted in traffic stops, DUI investigations and collision investigations.
Other class blocks will include Law Enforcement Operations, Investigations, SWAT, and Community Policing. These are just a few examples of the program that is intended to engage community members with members of RPD, to create discussion and education. These classes will also provide educational material to the involved members, to include reading material and informational aides. The staffing for these instructional blocks is being done on overtime with two to three sworn personnel responsible for each instructional block.
Given the population size of the City of Redding and the time commitment needed to attend a nine-week citizen academy, many community members will not be able to participate. Events such as “Coffee with a Cop” can be utilized as another way to connect with some of these community members as well. These events are also important and allow the community to interact with sworn personnel of the RPD, and engage in conversation on topics that are driven by community members, such as neighborhood complaints, traffic complaints, concerns, and community goals. During these events sworn personnel can interact with the community outside of an instructional, more formal setting. These events can also be held at local coffee businesses throughout the City of Redding that will also engage our local business owners and members.
RPD will utilize social media platforms to recognize these events and promote the programs and events. Social media will also be used to share the topics and educate the public on the individual events and topics of discussion. By using social media, it could create further community member involvement, and create a long standing educational and interactive program.
Packet Pg. 85
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 12 of 21
Goals
Description
Reduce the number of persons killed in traffic crashes.
Reduce the number of persons injured in traffic crashes.
Reduce the number of pedestrians killed in traffic crashes.
Reduce the number of pedestrians injured in traffic crashes.
Reduce the number of bicyclists killed in traffic crashes.
Reduce the number of bicyclists injured in traffic crashes.
Reduce the number of persons killed in alcohol-involved crashes.
Reduce the number of persons injured in alcohol-involved crashes.
Reduce the number of persons killed in drug-involved crashes.
Reduce the number of persons injured in drug-involved crashes.
Reduce the number of persons killed in alcohol/drug combo-involved crashes.
Reduce the number of persons injured in alcohol/drug combo-involved crashes.
Reduce the number of motorcyclists killed in traffic crashes.
Reduce the number of motorcyclists injured in traffic crashes.
Reduce hit & run fatal crashes.
Reduce hit & run injury crashes.
Reduce nighttime (2100 - 0259 hours) fatal crashes.
Reduce nighttime (2100 - 0259 hours) injury crashes.
Custom Description
Objectives
Included Target
Number Description
Yes 1
Issue a press release announcing the kick-off of the grant by November 15. The kick-off press releases and media advisories, alerts, and materials must be emailed to the OTS Public Information Officer at [email protected], and copied to your OTS Coordinator, for approval 7 days prior to the issuance date of the release.
Yes 10
Participate and report data (as required) in the following campaigns; Quarter 1: National Pedestrian Safety Month, National Walk to School Day, National Teen Driver Safety Week, NHTSA Winter Mobilization; Quarter 3: National Distracted Driving Awareness Month, National Motorcycle Safety Month, National Bicycle Safety Month, National Click it or Ticket Mobilization; Quarter 4: National Speed Prevention Campaigns, NHTSA Summer Mobilization, National Child Passenger Safety Week, and California's Pedestrian Safety Month.
Packet Pg. 86
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 13 of 21
Yes 1
Develop (by December 31) and/or maintain a “DUI BOLO” program to notify patrol and traffic officers to be on the lookout for identified repeat DUI offenders with a suspended or revoked license as a result of DUI convictions. Updated DUI BOLOs should be distributed to patrol and traffic officers monthly.
Yes 8
Send law enforcement personnel to the NHTSA Standardized Field Sobriety Testing (SFST) (minimum 16 hours) POST-certified training.
Yes 8
Send law enforcement personnel to the NHTSA Advanced Roadside Impaired Driving Enforcement (ARIDE) 16 hour POST-certified training.
Yes 1
Send law enforcement personnel to the Drug Recognition Expert (DRE) training (classroom and field training must be completed).
Yes 1 Send law enforcement personnel to the DRE Recertification training.
Yes 2 Send law enforcement personnel to SFST Instructor training.
No 0 Send law enforcement personnel to DRE Instructor training.
Yes 6
Conduct DUI/DL Checkpoints. A minimum of 1 checkpoint should be conducted during the NHTSA Winter Mobilization and 1 during the Summer Mobilization. To enhance the overall deterrent effect and promote high visibility, it is recommended the grantee issue an advance press release and conduct social media activity for each checkpoint. For combination DUI/DL checkpoints, departments should issue press releases that mention DL's will be checked at the DUI/DL checkpoint. Signs for DUI/DL checkpoints should read "DUI/Driver's License Checkpoint Ahead." OTS does not fund or support independent DL checkpoints. Only on an exception basis and with OTS pre-approval will OTS fund checkpoints that begin prior to 1800 hours. When possible, DUI/DL Checkpoint screeners should be DRE- or ARIDE-trained.
Yes 30 Conduct DUI Saturation Patrol operation(s).
Yes 0
Conduct Court Sting operation(s) to cite individuals driving to and from the court after having their driver's license suspended or revoked.
Yes 2
Conduct Warrant Service operation(s) targeting multiple DUI offenders who fail to appear in court.
Yes 1
Conduct Stakeout operation(s) that employ law enforcement officers to observe repeat DUI offender probationers with suspended or revoked driver licenses.
Yes 25 Conduct Traffic Enforcement operation(s), including but not limited to, primary crash factor violations.
Yes 6
Conduct highly publicized Distracted Driving enforcement operation(s) targeting drivers using hand held cell phones and texting.
Yes 6
Conduct highly publicized Motorcycle Safety enforcement operation(s) in areas or during events with a high number of motorcycle incidents or crashes resulting from unsafe speed, DUI, following too closely, unsafe lane changes, improper turning, and other primary crash factor violations by motorcyclists and other drivers.
No 0 Conduct Nighttime (1800-0559) Click It or Ticket enforcement operation(s).
Yes 6
Conduct highly publicized pedestrian and/or bicycle enforcement operation(s) in areas or during events with a high number of pedestrian and/or bicycle crashes resulting from violations made by pedestrians, bicyclists, and drivers.
Yes 4
Conduct Traffic Safety educational presentation(s) with an effort to reach community members.
Note: Presentation(s) may include topics such as distracted driving, DUI, speed, bicycle and pedestrian safety, seat belts and child passenger safety.
Yes 2 Conduct Know Your Limit campaigns with an effort to reach members of the community.
Yes 4 Participate in highly visible collaborative DUI Enforcement operations.
Yes 4 Participate in highly visible collaborative Traffic Enforcement operations.
Yes 2 Send law enforcement personnel to DUI Checkpoint Planning and Management training.
Yes 2
Conduct specialized enforcement operations focusing specifically on street racing and sideshow activities.
Yes 2
Conduct Illegal Street Racing and Modified Vehicle training classes for law enforcement personnel.
Yes 1
Identify grant funded, straight time personnel. Include any vacancies or staff changes that have occurred. For any vacancies, include the status of filling the vacancy.
Packet Pg. 87
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 14 of 21
Yes 5
Participate in community collaboration and engagement activities to engage in conversations regarding traffic safety to both share information and receive input from the community members.
No 0
Utilize the oral fluid drug screening device at roadside to assist with identifying drug use during DUI investigations. Report on the use, accomplishments, or challenges associated with the use of the oral fluid drug screening device.
Yes 4
Send law enforcement personnel to a POST certified implicit bias training, such as; Implicit Bias and Community Policing, Principles Policing, or Beyond Bias.
No 0
Execute subcontracts referenced in the budget. Prior to finalizing the subcontract, grantee should work with the OTS to ensure all costs in the sub contract are allowable. Upon execution of subcontract, upload a copy of the subcontract and request a revision to the grant budget to add new budget line items for associated costs under contractual services. If not yet executed, provide ETA.
Included Target Number Custom Description
Method of Procedure
Phase 1 - Program Preparation:
The department will develop operational plans to implement the “best practice” strategies outlined in the objectives section.
All training needed to implement the program should be conducted in the first quarter.
All grant related purchases needed to implement the program should be made in the first quarter.
In order to develop/maintain the “DUI BOLOs,” research will be conducted to identify the “worst of the worst” repeat DUI offenders with a suspended or revoked license as a result of DUI convictions. The DUI BOLO may include the driver’s name, last known address, DOB, description, current license status, and the number of times suspended or revoked for DUI. DUI BOLOs should be updated and distributed to traffic and patrol officers at least monthly.
Implementation of the STEP grant activities will be accomplished by deploying personnel at high crash locations.
Media Requirements:
Issue a press release approved by the OTS PIO announcing the kick-off of the grant by November 15, but no sooner than October 1. The kick-off release must be approved by the OTS PIO and only distributed after the grant is fully signed and executed. If you are unable to meet the November 15 deadline to issue a kick-off press release, communicate reasons to your OTS grant coordinator and OTS PIO.
Phase 1 - Program Preparation Addendum:
Phase 2 - Program Operations:
The department will work to create media opportunities throughout the grant period to call attention to the innovative program strategies and outcomes.
Media Requirements
The following requirements are for all grant-related activities:
Packet Pg. 88
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 15 of 21
Send all media advisories, alerts, videos, graphics, artwork, posters, radio/PSA/video scripts, storyboards, digital and/or print educational materials for grant-related activities to the OTS PIO at [email protected] for approval and copy your OTS grant coordinator. Optimum lead time would be 7 days before the scheduled release but at least 3 business days prior to the scheduled release date for review and approval is appreciated.
Send all Powerpoint presentations, online presentations and trainings for grant-related activities to the OTS PIO at [email protected] for approval and copy your OTS grant coordinator. Certified training courses are EXEMPT from the approval process.
The OTS PIO is responsible for the approval of the design and content of materials. The agency understands OTS PIO approval is not authorizing approval of budget expenditure or cost. Any cost approvals must come from the OTS grant coordinator.
Pre-approval is not required when using any OTS-supplied template for media advisories, press releases, social media graphics, videos or posts, or any other OTS-supplied educational material. However, copy the OTS PIO at [email protected] and your OTS grant coordinator when any material is distributed to the media and public, such as a press release, educational material, or link to social media post. The OTS-supplied kick-off press release templates and any kickoff press releases are an exception to this policy and require prior approval before distribution to the media and public.
If an OTS-supplied template, educational material, social media graphic, post or video is substantially changed, the changes shall be sent to the OTS PIO at [email protected] for approval and copy to your OTS grant coordinator. Optimum lead time would be 7 days prior to the scheduled release date, but at least 3 business days prior to the scheduled release date for review and approval is appreciated.
Press releases, social media posts and alerts on platforms such as NextDoor and Nixle reporting immediate and time-sensitive grant activities (e.g. enforcement operations, day of event highlights or announcements, event invites) are exempt from the OTS PIO approval process. The OTS PIO and your OTS grant coordinator should still be notified when the grant-related activity is happening (e.g. car seat checks, bicycle rodeos, community presentations, DUI checkpoints, etc.).
Enforcement activities such as warrant and probation sweeps, court stings, etc. that are embargoed or could impact operations by publicizing in advance are exempt from the PIO approval process. However, announcements and results of activities should still be copied to the OTS PIO at [email protected] and your OTS grant coordinator with embargoed date and time or with “INTERNAL ONLY: DO NOT RELEASE” message in subject line of email.
Any earned or paid media campaigns for TV, radio, digital or social media that are part of a specific grant objective, using OTS grant funds, or designed and developed using contractual services by a subgrantee, requires prior approval. Please send to the OTS PIO at [email protected] for approval and copy your grant coordinator at least 3 business days prior to the scheduled release date.
Social media posts highlighting state or national traffic safety campaigns (Distracted Driving Month, Motorcycle Safety Awareness Month, etc.), enforcement operations (DUI checkpoints, etc.), or any other grant-related activity such as Bicycle rodeos, presentations, or events, are highly encouraged but do not require prior approval.
Submit a draft or rough-cut of all digital, printed, recorded or video material (brochures, posters, scripts, artwork, trailer graphics, digital graphics, social posts connected to an earned or paid media campaign grant objective) to the OTS PIO at [email protected] and copy your OTS grant coordinator for approval prior to the production or duplication.
Use the following standard language in all press, media, and printed materials, space permitting: Funding for this program was provided by a grant from the California Office of Traffic Safety, through the National Highway Traffic Safety Administration.
Space permitting, include the OTS logo on all grant-funded print materials, graphics and paid or earned social media campaign grant objective; consult your OTS grant coordinator for specifics, format-appropriate logos, or if space does not permit the use of the OTS logo.
Email the OTS PIO at [email protected] and copy your OTS grant coordinator at least 21 days in advance, or when first confirmed, a short description of any significant grant-related traffic safety event or program, particularly events that are highly publicized beforehand with anticipated media coverage so OTS has sufficient notice to arrange for attendance and/or participation in the event. If unable to attend, email the OTS PIO and coordinator brief highlights and/or results, including any media coverage (broadcast, digital, print) of event within 7 days following significant grant-related event or program. Media and program highlights are to be reflected in QPRs.
Any press releases, work plans, scripts, storyboards, artwork, graphics, videos or any educational or informational materials that received OTS PIO approval in a prior grant year needs to be resubmitted for approval in the current grant year.
For additional guidance, refer to the OTS Grants Materials Approval Process Guidelines and OTS Grants Media Approval Process FAQs on the OTS website.
Contact the OTS PIO or your OTS grant coordinator for consultation when changes from any of the above requirements might be warranted.
Phase 2 - Program Operations Addendum:
Packet Pg. 89
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 16 of 21
Phase 3 - Data Collection:
1. Prepare and submit grant claim invoices (due January 30, April 30, July 30, and October 30)
2. Prepare and submit Quarterly Performance Reports (QPR) (due January 30, April 30, July 30, and October 30)
Collect and report quarterly, appropriate data that supports the progress of goals and objectives.
Provide a brief list of activity conducted, procurement of grant-funded items, and significant media activities. Include status of grant-funded personnel, status of contracts, challenges, or special accomplishments.
Provide a brief summary of quarterly accomplishments and explanations for objectives not completed or plans for upcoming activities.
Collect, analyze and report statistical data relating to the grant goals and objectives.
Phase 3 - Data Collection Addendum:
Budget
Personnel Costs
Hourly Rates - When requesting hours for personnel, enter them as straight time or overtime (for Enforcement Overtime, please use section below) and include the amount of hours that they will spend on grant operations.
Example: Personnel getting paid 100% by the grant working a full year at $41.00 per hour would be entered as Straight time, 2080 Units, $41.00 Unit cost or Rate, and 100% Percent Paid by Grant. This gives a total of $85,280.00 for the year.
Benefits – If requesting benefits for personnel, enter all benefits as a separate line item for each. Start the Item Name with the word 'Benefits', enter the corresponding straight time or overtime total amount in the Unit Cost or Rate, and enter the Benefits Rate to have the system calculate Benefit Costs. (Unit Cost) X (Benefits Rate) = Benefit Costs. To properly relate benefits to the correct personnel line item use the Display Order field, for example use 100.0 for Display Order for the personnel line item and 100.1 for Display Order for the associated Benefits.
Display
Order
Cost
Category
Item
Name
Position
Type
Benefit
Rate
Unit Cost or
Rate Units Percent Paidby Grant
Calculated Cost
to Grant
100.0 A. Personnel
Costs
DUI
Officer
Straight
time $52.52 2,080 100.00% $109,241.60
100.1 A. Personnel
Costs Benefits Straighttime 92.00% $109,241.60 1 100.00% $100,502.27 199.0 A. Personnel
Costs
Benefits
OT Overtime 1.45% $180,600.00 1 100.00% $2,618.70
Packet Pg. 90
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 17 of 21
Display
Order
Cost
Category Enforcement Activity Item Name Unit Costor Rate Units Calculated
Cost to
Grant
110.0
A.
Personnel
Costs
DUI/DL Checkpoints DUI/DL Checkpoints $7,008.00 6 $42,048.00 111.0
A.
Personnel
Costs
DUI Saturation Patrols DUI Saturation Patrols $1,872.00 30 $56,160.00 112.0
A.
Personnel
Costs
Collaborative DUI
Enforcement
Collaborative DUI
Enforcement $7,008.00 4 $28,032.00
113.0
A.
Personnel
Costs
Warrant Service Operations Warrant Service Operations $936.00 2 $1,872.00 114.0
A.
Personnel
Costs
Stakeouts Stakeouts $624.00 1 $624.00
115.0
A.
Personnel
Costs
Traffic Enforcement Traffic Enforcement $936.00 25 $23,400.00 116.0
A.
Personnel
Costs
Distracted Driving Distracted Driving $936.00 6 $5,616.00 117.0
A.
Personnel
Costs
Motorcycle Safety Motorcycle Safety $936.00 6 $5,616.00 118.0
A.
Personnel
Costs
Pedestrian and Bicycle
Enforcement
Pedestrian and Bicycle
Enforcement $936.00 6 $5,616.00
119.0
A.
Personnel
Costs
Collaborative Traffic
Enforcement
Collaborative Traffic
Enforcement $936.00 4 $3,744.00
120.0
A.
Personnel
Costs
Other Community Collaboration $624.00 5 $3,120.00
121.0
A.
Personnel
Costs
Street Racing and Sideshow
Enforcement Operations
Street Racing and Sideshow
Enforcement Operations $936.00 2 $1,872.00
122.0
A.
Personnel
Costs
Traffic Safety Education Traffic Safety Education $720.00 4 $2,880.00 Personnel Costs: $392,962.57
Travel Expenses
Display Order Cost Category Item Name Unit Cost or Rate Units Calculated Cost to Grant 200.0 B. Travel Expenses In State Travel $6,000.00 1 $6,000.00 Travel Expenses: $6,000.00
Contractual Services
Packet Pg. 91
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 18 of 21
Do not include brand names or names of specific organizations.
Display Order Cost Category Item Name Unit Cost or Rate Units Calculated Cost to Grant Contractual Services: $0.00
Equipment (must have Unit Cost of at least $5,000)
Do not include brand names or names of specific organizations.
Please include an equipment quote in the Upload Documents Tab.
NOTE : When creating a new "Equipment" budget item, the Standard Language Item drop down list may not be available. When this is the case, complete only the required fields and save the budget item. Once saved, select the Edit button (pencil icon); the Standard Language Item drop down list will be available for selection. Alternatively, if not requesting a Standard Language Item, please utilize the Custom Narrative field to enter an appropriate narrative.
Display
Order
Cost
Category Item Name Unit Cost orRate Units Calculated Cost toGrant 400.0 D.
Equipment
Complete Traffic Crash Database
System $31,300.00 1 $31,300.00
Equipment: $31,300.00
Other Direct Costs (must have Unit Cost of less than $5,000, including tax and shipping) Do not include brand names or names of specific organizations.
NOTE : When creating a new "Other Direct Cost" budget item, the Standard Language Item drop down list may not be available. When this is the case, complete only the required fields and save the budget item. Once saved, select the Edit button (pencil icon); the Standard Language Item drop down list will be available for selection. Alternatively, if not requesting a Standard Language Item, please utilize the Custom Narrative field to enter an appropriate narrative.
Display
Order Cost Category Item Name Unit Cost orRate Units Calculated Cost toGrant 500.0 E. Other Direct
Costs DUI Checkpoint Supplies $5,100.00 1 $5,100.00
501.0 E. Other Direct
Costs
PAS Device/Calibration
Supplies $800.00 4 $3,200.00
Other Direct Costs: $8,300.00
Indirect Costs
Item Name should indicate the % and the Cost Category for Indirect Costs e.g. 15% of Salaries and Benefits. Use the Percent Paid by Grant for the Indirect Rate and the Unit Cost or Rate field to indicate the total amount for which Indirect Costs will be claimed. The system will calculate the Cost to Grant.
Indirect Cost Rate must be supported by a federally approved indirect cost rate letter and uploaded to the application.
Packet Pg. 92
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 19 of 21
Display Order Cost Category Item Name Indirect Rate Amount Subject to Indirect Calculated Cost to Grant Indirect Costs: $0.00
Total Requested Funding: $438,562.57
Narrative Review
Review and update Narrative for Budget Items
Cost
Category Item Narrative CustomNarrative
A.
Personnel
Costs
DUI Officer
Hours for officer dedicated strictly to DUI Enforcement. Hours may include wages or authorized absences, such as annual leave and sick leave, provided they are accrued during the grant term.
A.
Personnel
Costs
Benefits
Workers'
Comp
10.05%
PERS
Retirement
60.8%
Medicare
1.45%
Group
Health Flate
rate of
$21,500
A.
Personnel
Costs
DUI/DL
Checkpoints
Overtime for grant funded law enforcement operations conducted by appropriate department personnel.
A.
Personnel
Costs
DUI Saturation
Patrols
Overtime for grant funded law enforcement operations conducted by appropriate department personnel.
A.
Personnel
Costs
Collaborative DUI
Enforcement
Overtime for grant funded Collaborative DUI Enforcement operations conducted by appropriate department personnel A.
Personnel
Costs
Warrant Service
Operations
Overtime for grant funded Warrant Service Operations conducted by appropriate department personnel.
A.
Personnel
Costs
Stakeouts Overtime for grant funded law enforcement operations conducted by appropriate department personnel.
A.
Personnel
Costs
Traffic
Enforcement
Overtime for grant funded law enforcement operations conducted by appropriate department personnel.
A.
Personnel
Costs
Distracted Driving Overtime for grant funded law enforcement operations conducted by appropriate department personnel.
Packet Pg. 93
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 20 of 21
A.
Personnel
Costs
Motorcycle Safety Overtime for grant funded law enforcement operations conducted by appropriate department personnel.
A.
Personnel
Costs
Pedestrian and
Bicycle
Enforcement
Overtime for grant funded law enforcement operations conducted by appropriate department personnel.
A.
Personnel
Costs
Collaborative
Traffic
Enforcement
Overtime for grant funded Collaborative Traffic Enforcement operations conducted by appropriate department personnel A.
Personnel
Costs
Community
Collaboration
Overtime for
grant funded
community
outreach.
A.
Personnel
Costs
Street Racing and
Sideshow
Enforcement
Operations
Overtime for grant funded law enforcement operations conducted by appropriate department personnel.
A.
Personnel
Costs
Traffic Safety
Education
Overtime for
grant funded
education
through the
Department's
Citizen
Academy
A.
Personnel
Costs
Benefits OT
Medicare
expense for
grant funded
OT.
B. Travel
Expenses In State Travel
Costs are included for appropriate staff to attend conferences and training events supporting the grant goals and objectives and/or traffic safety. Local mileage for grant activities and meetings is included. Anticipated travel may include (enter other known conferences or required events). All conferences, seminars or training not specifically identified in the Budget Narrative must be approved by OTS. All travel claimed must be at the agency approved rate. Per Diem may not be claimed for meals provided at conferences when registration fees are paid with OTS grant funds.
D.
Equipment
Complete Traffic
Crash Database
System
A traffic crash database to collect, analyze, and display crash and enforcement data, including a full featured module for analysis, allowing queries for top ranking lists of locations, breakdowns by cause, type, injury, conditions, and many other attributes. Queries and Reports will be provided in a variety of formats including pie charts, bar charts, and summaries. The system provides for crash mapping on Google Earth, ESRI GIS, or similar mapping products.
Costs may include laptop/desktop computers, software and licenses, printers, accessories, training, and associated shipping and taxes.
E. Other
Direct
Costs
DUI Checkpoint
Supplies
On-scene supplies needed to conduct sobriety checkpoints. Costs may include 28" traffic cones, MUTCD compliant traffic signs, MUTCD compliant high visibility vests (maximum of 10), traffic counters (maximum of 2), generator, gas for generators, lighting, reflective banners, electronic flares, PAS Device/Calibration Supplies, heater, propane for heaters, fan, anti-fatigue mats, and canopies. Additional items may be purchased if approved by OTS.
The cost of food and beverages will not be reimbursed. Each item must have a unit cost of less than $5,000 (including tax and shipping).
E. Other
Direct
Costs
PAS
Device/Calibration
Supplies
Preliminary alcohol screening device to detect the presence of alcohol in a person's breath and calibration supplies to ensure accuracy. Costs may include mouth pieces, gas and accessories.
Packet Pg. 94
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application) Application :: Page 21 of 21
Upload Documents (Optional)
Please try to include all information in the application itself, but if necessary, upload additional documents here
Document Name Update Date/Time
Application Report 2024-01-31 22:39:36.pdf 1/31/2024 2:39 PM Bosch CDR Tool_Whitepaper.pdf 1/29/2024 9:10 AM
2024CDGSoleSource_10841ace-abb8-4b07-9179-f8e77d02a706.pdf 1/29/2024 9:10 AM 2023_CDRCountryManufacture_9f4b26e5-d584-44dc-9907-acae480f2448.pdf 1/29/2024 9:10 AM Est_Q13834_from_CRASH_DATA_GROUP_INC._25940.pdf 1/29/2024 9:10 AM Evaluation, Support, and Submittal
Evaluation, Support, and Submittal
Method of Evaluation:
Using the data compiled during the grant, the Grant Director will complete the “Final Evaluation” section in the fourth/final Quarterly Performance Report (QPR). The Final Evaluation should provide a brief summary of the grant’s accomplishments, challenges and significant activities. This narrative should also include whether goals and objectives were met, exceeded, or an explanation of why objectives were not completed.
Administrative Support:
This program has full administrative support, and every effort will be made to continue the grant activities after grant conclusion.
Total Requested Funding:
$438,562.57
Packet Pg. 95
Attachment: Completed grant application (4.9(a)--Ratify Office of Traffic Safety Grant Application)
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize and approve the following for the City of Redding Solid Waste Utility:
(1) Authorize the purchase of one 2024 Kenworth T380 chassis using Sourcewell contract pricing with a net delivered cost of $124,050.59 including all applicable taxes and fees; (2) Award Bid Schedule 5441 to the apparent low bidder Interstate Assembly Systems for the purchase of one 2023 or newer Heavy Equipment Service Body with Crane (Service Body) with a net delivered cost of $192,889.13 including all applicable taxes and fees; and
(3) Authorize the City Manager to approve future pricing adjustments, terms, and policy changes as needed due to inflation and unstable economic conditions up to a total of $30,000.
Fiscal Impact
Funding for the acquisition of this service truck was planned for in the West Central Landfill Rolling Stock Replacement Fund and approved by the Solid Waste Disposal Committee in June of 2023.
Alternative Action
The City Council could choose not to authorize the purchases as recommended and provide alternate direction to staff.
MEETING DATE: February 20, 2024
ITEM NO. 4.11(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(a)--Authorize the Purchase of One 2024 Kenworth T380 Chassis Using Sourcewell Contract Pricing and One 2023 or Newer Service Body Michael Webb, Public Works
Director
Packet Pg. 96
Report to Redding City Council February 14, 2024
Re: 4.11(a)--Purchase One 2024 Kenworth T380 Chassis Using Sourcewell Contract Pricing and One Page 2
Background/Analysis
The City of Redding (City) is responsible for performing daily operations at the West Central Landfill which is a 1,200-acre site located in Igo. The service truck is an essential piece of equipment used by the mechanics to perform maintenance and repairs on heavy equipment at various locations throughout the site (leachate ponds, scale house, pump house and methane flare). A properly sized and equipped service truck provides staff a mobile vehicle, equipped with many of the tools needed to make repairs in the field, away from the shop. It is more efficient for most repairs to be done in the field, instead of transporting slow moving equipment to the shop. Mobile maintenance is being utilized even more than in the past, given that the working face is moving further from the shop location as the landfill grows in size. The new service truck will replace the existing unit (a 1992 Ford F800; approximately 32 years old) that has reached the end of its expected lifecycle and is undersized for current operations as the existing unit’s crane limits the repairs that can be performed in the field.
Staff recommends purchasing the Kenworth T380 off the Sourcewell contract due to the cost savings realized through cooperative agreements. The Sourcewell contract was competitively bid. In addition to being an industry standard, using the Sourcewell contract to purchase equipment saves significant staff time needed to prepare bid specifications and solicit individual quotations from vendors. The City also receives a significant price discount due to economies of scale realized through the volume of purchases on a multi-agency cooperative contract.
The service body was put out to competitive bid with three bid opportunity notices distributed to potential vendors, in addition to posting on the City’s website and advertising in the Record Searchlight. Two bid responses were received; the apparent low bid in the amount of $192,889.13 was submitted by Interstate Assembly Systems.
Environmental Review
This activity is not a project as defined by the California Environmental Quality Act, and no further action is required.
Council Priority/City Manager Goals
This agenda item is a routine operational item.
Attachments
^Service Truck Quote and Bid Tab
Packet Pg. 97
Packet Pg. 98
Attachment: ^Service Truck Quote and Bid Tab (4.11(a)--Purchase One 2024 Kenworth T380 Chassis Using Sourcewell Contract Pricing and Packet Pg. 99
Attachment: ^Service Truck Quote and Bid Tab (4.11(a)--Purchase One 2024 Kenworth T380 Chassis Using Sourcewell Contract Pricing and Packet Pg. 100 Attachment: ^Service Truck Quote and Bid Tab (4.11(a)--Purchase One 2024 Kenworth T380 Chassis Using Sourcewell Contract Pricing and
CITY OF REDDING
REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following actions relative to Consulting and Professional Services Contract (C5900) for the Old Alturas Road Bridge over Churn Creek Project:
(1) Approve the Fifth Amendment to the Consulting and Professional Services Contract (C5900) with Morrison Structures, Inc., in the amount of $36,503.12, for a total not to exceed fee of $596,308.07;
(2) Authorize the City Manager to execute the Amendment; and (3) Authorize the City Manager to approve additional contract amendments not to exceed $40,000.
Fiscal Impact
The total project cost of the Old Alturas Road Bridge over Churn Creek Project (Project) is estimated at approximately $9.5 million dollars. The Project is 88.53 percent funded by the Federal Highway Bridge Program, with the remaining 11.47 percent being funded by the City of Redding’s (City) Transportation Impact Fee fund. The total Project cost includes a consultant contract with Morrison Structures Inc., (Morrison) to provide bridge design services through construction. This amendment will increase Morrison’s consultant contract by $36,503.12.
See table below for a summary of amended costs to Morrison’s consultant contract (table only includes amendments that adjusted the contract amount).
Original
Contract
Amount
3rd Amendment 5th Amendment
Adjustment
Revised
Total Adjustment
Revised
Total
$346,499.52 $213,305.43 $559,804.95 $36,503.12 $596,308.07 MEETING DATE: February 20, 2024
ITEM NO. 4.11(b)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(b)--Approve the Fifth Amendment to Consulting and Professional Services Contract (C-5900) for the Old Alturas Road Bridge over Churn Creek Project Michael Webb, Public Works
Director
Packet Pg. 101
Report to Redding City Council February 14, 2024
Re: 4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk Page 2
Alternative Action
The City Council (Council) may choose not to authorize the amendment and provide staff with an alternate direction. Without the proposed amendment, Morrison will not be able to provide services during the construction phase of the bridge which would leave staff unable to use Morrison to provide bridge engineering solutions or technical input related to issues that may arise during construction.
Background Analysis
Over the course of the Project there have been a substantial increase in professional services required, mostly associated with the extended project duration due to cultural concerns. As a result of identified cultural sites the engineering design was revised to avoid certain areas which in turn created additional design costs. At the time of these design changes there was sufficient budget in the overall consultant contract. However, now that the project has moved into the construction phase, the additional funds requested in this amendment will allow Morrison to continue to provide engineering support during construction as necessary. The amendment has been approved as to form by the City Attorney.
At the February 5, 2013 Council meeting, authorization was given to negotiate a contract for the Project. The contract was executed in March 2013. In September 2015, June 2017, and again in June 2022, administrative amendments were executed to update the end date of the contract. In addition, in August 2020 staff went to Council for approval of an amendment to increase the project funding to complete the design. At this time, the project has been awarded to a contractor, however, there is still work to be done by Morrison that falls under Task 11 - Assistance During Bidding and Construction.
The Old Alturas Road bridge was constructed in 1964 and is currently designated as “functionally obsolete” per California Department of Transportation Bridge Inspection Reports.
This designation is largely due to the amount of traffic using the bridge and the lack of shoulders, pedestrian facilities, and turning movement capacity. The Project will rehabilitate the existing 28-foot-wide bridge to a 67-foot-wide bridge with three travel lanes, two 8-foot shoulders, two
5.5-foot sidewalks, and new concrete barrier rails on both sides. These improvements meet the requirements of both the American Association of State Highway and Transportation Officials and the City.
Environmental Review
This action is not a project as defined by the California Environmental Quality Act (CEQA). On December 6, 2016, Council adopted Resolution 2016-126 approving the Mitigated Negative Declaration and Mitigation Monitoring Program, and approving the Old Alturas Road and Churn Creek Bridge Rehabilitation Project, thereby satisfying the requirements of CEQA. No further action is required.
Council Priority/City Manager Goals
This is a routine operational item.
Packet Pg. 102
Report to Redding City Council February 14, 2024
Re: 4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk Page 3
Attachments
^C-5900_ 5th Amendment
C-5900_Contract
C-5900_1st Amendment
C-5900_2nd Amendment
C-5900_3rd Amendment
C-5900_4th Amendment
Reso 2016-126 - Bridge Rehabilitation Project
Previous Staff Report 2013
Previous Staff Report 2016
Previous Staff Report 2020
Packet Pg. 103
Packet Pg. 104
Attachment: ^C-5900_ 5th Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 105
Attachment: ^C-5900_ 5th Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 106
Attachment: ^C-5900_ 5th Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 107
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 108
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 109
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 110
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 111
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 112
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 113
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 114
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 115
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 116
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 117
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 118
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 119
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 120
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 121
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 122
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 123
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 124
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 125
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 126
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 127
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 128
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 129
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 130
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 131
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 132
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 133
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 134
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 135
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 136
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 137
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 138
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 139
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 140
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 141
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 142
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 143
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 144
Attachment: C-5900_Contract (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
CITY OF REDDING
777 CYPRESS AVENUE, REDDING, CA 96001
P.O. Box 496071, REDDING, CA 96049- 6071
OFFICE OF THE CITY CLERK
PAMELA MIZE, CITY CLERK
TERESA RUDOLPH, ASSISTANT CITY CLERK
530.225.4447
October 12, 2015
530.225.4463 FAX
Bob Morrison, S. E.
Morrison Structures, Inc.
1890 Park Marina Drive, Suite 104
Redding, CA 96001
SUBJECT: First Amendment to Consulting and Professional Services Agreement, C-5900 Dear Mr. Morrison:
Enclosed is a fully executed original of the above subject Amendment to Agreement by and between the City of Redding and Morrison- Structures, Inc., for engineering services for the Old Alturas Road Bridge over Churn Creek Project.
If you have any questions regarding this matter, or if we can be of assistance, please contact the Office of the City Clerk at ( 530) 225- 4439.
Enclosure
c: Corri Vandiver/Engineering Division
Finance
Sincerely,
PAMELA MIZE
City Clerk
By:
j dlXMarger St . e
Execut v Assistant I
FC3p`
Packet Pg. 145 Attachment: C-5900_1st Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
FIRST AMENDMENT TO
CONSULTING AND PROFESSIONAL SERVICES CONTRACT (C-5900)
Engineering Services for the Old Alturas Road Bridge over Churn Creek Project The Consulting and Professional Services Contract C-5900 (" Contract") dated March 27, 2013, between the City ofRedding, California, ("City") a municipal corporation, and Morrison Structures, Inc., (" Consultant") is hereby amended as follows:
Section 3.A is amended to read in its entirety as follows:
Consultant shall commence work on or about March 20, 2013, and complete said work no later than July 1, 2017. Time is ofthe essence.
All other terms and conditions ofthe Contract dated March 27, 2013, shall remain in full force and effect.
The date of this Amendment shall be the date that it is signed by the City.
IN WITNESS WHEREOF, City and Consultant have executed this Amendment on the days and year set forth below:
Dated: 30 .92015
Att
PAMELA AWZE, C! iry Clerk
CITY OF IjEl7
A MunfciB(al C
By: I BRL4N F. CRANE, Director ofPublic Works
Form Approved:
BARRYE DeWALT
City Atto ey
Bf JACOB R. BALDWIN
MORRISON STRUCTURES, INC.
Dated: S=,T o23 , 2015
By:
Taxpayer I.D. No.: 8- o4SSoS'
J1
0 Packet Pg. 146 Attachment: C-5900_1st Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
CITY OF CITY OF REDDING
REDDItte 777 CYPRESS AVENUE, REDDING, CA 96001
CALIFORNIA PO. Box 496071, REDDING, CA 96049- 6071
OFFICE OF THE CITY CLERK
PAMELA MIZE, CITY CLERK
TERESA RUDOLPH, ASSISTANT CITY CLERK
530.225.4447
530.225.4463 FAX
July 3, 2017
Bob Morrison, S. E.
Morrison Structures, Inc.
1890 Park Marina Drive, Suite 104
Redding, CA 96001
SUBJECT: Second Amendment to Legal Services Agreement, C-5900 Dear Mr. Morrison:
Enclosed is a fully executed original of the above subject Second Amendment to Agreement between the City of Redding and Morrison Structures, Inc. for engineering services for the Old Alturas Road Bridge over Churn Creek Project.
If you have any questions regarding this matter, or if we can be of assistance, please contact the Office of the City Clerk at ( 530) 225- 4439.
Sincerely,
Anette Cates
Executive Assistant
Enclosure
c: Corri Vandiver/Engineering
Finance
Packet Pg. 147 Attachment: C-5900_2nd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
SECOND AMENDMENT TO
CONSULTING AND PROFESSIONAL SERVICES CONTRACT (C-5900)
Engineering Services for the Old Alturas Road Bridge over Churn Creek Project The Consulting and Professional Services Contract C- 5900(" Contract") dated March 27, 2013, and amended September 30, 2015, between the City of Redding, California, (" City") a municipal corporation, and Morrison Structures, Inc., (" Consultant") is hereby amended as follows:
Section 3.A is amended to read in its entirety as follows:
Consultant shall commence work on or about March 20, 2013, and complete said work no later than July 1, 2022. Time is of the essence.
All other terms and conditions ofthe Contract dated March 27, 2013. and amended September 30, 2015, shall remain in full force and effect.
The date of this Amendment shall be the date that it is signed by the City.
IN WITNESS WHEREOF, City and Consultant have executed this Amendment on the days and year set forth below:
CITY 0 ' DDIN
A M icip. s o 0
Dated: r 3O 2017
B, BRIAN F. CRANE, Director ofPublic Works
Form Approved:
BARRY E. DeWALT
At •st: City Attorney
PAMELA MIZE, Ci,.. Clerk By:
MORRISON STRUCTURES, INC.
Dated: joie_ a 9 2017 274..,A4, 74, Nord a
iarsho mit T'
By:
Taxpayer I.D. No.: fig, oLiss-os8
Packet Pg. 148 Attachment: C-5900_2nd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 149
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 150
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 151
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 152
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 153
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 154
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 155
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 156
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 157
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 158
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 159
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 160
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 161
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 162
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 163
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 164
Attachment: C-5900_3rd Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 165
Attachment: C-5900_4th Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 166
Attachment: C-5900_4th Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Packet Pg. 167
Attachment: C-5900_4th Amendment (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) RESOLUTION NO. 2016- 126
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING
ADOPTING A MITIGATED NEGATIVE DECLARATION AND
MITIGATION MONITORING PROGRAM, AND APPROVING THE OLD
ALTURAS ROAD AND CHURN CREEK BRIDGE REHABILITATION
PROJECT
WHEREAS, the City of Redding, as lead agency for the Old Alturas Road and Churn Creek Bridge Rehabilitation Project ( Project), has conducted the following environmental review for the proposed Project:
1. Environmental studies were conducted and summarized in an Initial Study dated October 18, 2016; and
2. A proposed Mitigated Negative Declaration ( MND) was circulated for review and comment at the State Clearinghouse from October 20 to November 18, 2016, and with the Shasta County Clerk from October 27 to November 28, 2016; and
3. There were no substantive public comments that could not be addressed during the public comment period; and
WHEREAS, the MND identified potential significant environmental impacts which have been reduced to a less than significant level by incorporation of mitigation measures into the Project; and
WHEREAS, a Mitigation Monitoring and Reporting Program has been written as required by the California Environmental Quality Act and is attached to the MND; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Redding, based upon the entire record of environmental review for the Old Alturas Road and Churn Creek Bridge Rehabilitation Project, hereby adopts the Mitigated Negative Declaration and Mitigation and Monitoring Program, and approves the project as described.
I HEREBY CERTIFY that the foregoing resolution was introduced and read at a regular meeting of the City Council of the City of Redding on the 6th day of December, 2016, and was duly adopted at said meeting by the following vote:
AYES: COUNCIL MEMBERS: McElvain, Schreder, Sullivan, Winter, & Weaver NOES: COUNCIL MEMBERS: None j
ABSENT: COUNCIL MEMBERS: None p
ABSTAIN: COUNCIL MEMBERS: None 6
BRENT WEAVER, Mayor 6
ATTEST: FORM APPROVAL:
PAMELA MIZE, CityClerk BARRY . 1 e ` AL , City Attorney Packet Pg. 168 Attachment: Reso 2016-126 - Bridge Rehabilitation Project (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over S, 20- J-l
CITY OF REDDING
REPORT TO CITY COUNCIL
ITEM NO.
DATE: January 24, 2013
B- 050- 100/ S- 070- 050
CITY
FROM: Brian Crane, Public Works Director
SUBJECT: Award Request for Proposal No. 4507 and
Authorize Negotiation and Execution of a
Consulting and Professional Services
Contract for the Old Alturas Road Bridge
over Chum Creek Replacement or
Rehabilitation Project
Recommendation
It is recommended that the City Council ( Council): ( 1) select Alternative 1 to award Request for Proposal No. 4507 to Morrison Structures, Inc., and authorize staff to negotiate a consultant services contract; ( 2) authorize the Mayor to execute a contract with Morrison Structures, Inc., to provide project management, preliminary and final design, environmental compliance, right-of-way coordination, and technical assistance during bidding and construction services for the Old Alturas Road Bridge over Chum Creek Replacement or Rehabilitation Project for a not- to- exceed fee of 350, 000; and ( 3) authorize the City Manager to approve contract amendments not to exceed 40,000. Funding for these services will come from the Federal Highway Bridge Replacement and Rehabilitation Program ( HBRR) and will be matched with City Traffic Impact Fees ( TIF).
Background
On April 19, 2011, the Council approved the submittal of an application for federal funding for the rehabilitation or replacement of the Old Alturas Road bridge over Chum Creek located approximately 500 feet east of Victor Avenue. The bridge was constructed in 1964 and is currently designated as " functionally obsolete" per Caltrans Bridge Inspection Reports, largely due to the amount of traffic using the bridge and the lack of safety shoulders and turning-movement capacity.
The project will either rehabilitate or replace the existing two- lane bridge with a three- lane, pedestrian- accessible bridge.
The total project costs for the replacement or rehabilitation of the Old Alturas Road bridge are expected to be in the $ 3 million range.
CONSULTANT SELECTION PROCESS
In September 2012, a formal Request for Proposal No. 4507, outlining the specific scope of work, was advertised. Proposals were required to include separately proposed fees for the entire scope of services. Proposals and fee schedules were received on October 23, 2012, from four firms.
A review and selection panel was formed with members from the Public Works Department. Based upon proposal review and experience, the panel ranked the firms as follows:
Packet Pg. 169 Attachment: Previous Staff Report 2013 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Report to City Council
Re Award RFP - Old Alturas Road Bridge over Churn Creek Replacement January 24, 2013
Cornerstone Structural Engineering Group (Fresno, CA)
Morrison Structures, Inc. (Redding, CA)
TRC ( Rancho Cordova, CA)
Willdan Engineering ( Redding, CA)
263, 112. 00
2 $ 400, 000. 00
3 $ 369, 375. 28
4 $ 485, 209. 00
Proposals were evaluated based on their understanding of the scope of work, ability to meet the proposed schedule and maintain the project budget, experience and qualifications of the proposed staff, ability to work with City staff, and geographic location ofthe team. Applying the criteria to the proposals, the selection team chose to interview the two top- ranked firms- Cornerstone Structural Engineering Group and Morrison Structures, Inc. After completing the interview process, the selection panel determined that Morrison Structures, Inc. ( Morrison), was more suited for this project. Most recently, staff worked with Morrison on the design and construction support of both bridges within the Stillwater Business Park. During these projects, staff formed a positive working relationship with Morrison and is confident in their timely delivery and final product. At this point, staff has not had the opportunity to work with Cornerstone to develop this same level of comfort.
In addition, Cornerstone' s office is located in Fresno, California, making immediate access to the job site, particularly during construction, a potential issue when timely decisions need to be made. The selection team chose Morrison as the most qualified team to provide the required services.
Federal funding requirements dictate that the consultant selection process be qualification- based, not by cost, as long as the fee is reasonable. After review of the fees for the two top-ranked consultants, it is apparent to staff that Cornerstone underestimated the fee in survey, utility coordination, and services during construction tasks, while Morrison overestimated the fee in the advanced planning study and preparation of contract document tasks. However, in preliminary negotiations with the top-ranked consulting firm, Morrison, it was determined that based on some assumptions made at the time ofproposal, the fee could be modified to $350, 000. Based on previous similar projects and the other proposed fees, staffbelieves Morrison' s modified fee is reasonable for the scope of services for this project.
As part of this project, the consultant is required to coordinate with City staff to identify any right-of-way required for the project. If it is determined that right-of-way will be required, the consultant may be tasked to provide additional right-of-way services or other unexpected contract modifications. Staff recommends the approval of an additional $40, 000 in contingency reserve for this contract. If this reserve needs to be utilized, a
scope amendment would be negotiated with the
consultant and the contract would be modified with approval of the City Manager.
Issue
Should the Council award Request For Proposal No. 4507 to Morrison Structures, Inc., and direct staff to negotiate and execute a contract for engineering and design services for the Old Alturas Road Bridge over Chum Creek Replacement or Rehabilitation Project for a not- to- exceed fee of$ 350, 000 and authorize the City Manager to approve contract amendments not to exceed $ 40, 000? Packet Pg. 170 Attachment: Previous Staff Report 2013 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Report to City Council
I
Re Award RFP - Old A,lturas Road Bridge over Churn Creek Replacement January 24; 2013
Alternatives; Implication ofAlternatives
The Council has the option of selecting one of the following alternatives:
1. Award the Request for Proposal No. 4507 to Morrison Structures, Inc., and authorize staffto negotiate, and the Mayor to execute, a consultant services contract with Morrison for design services for the Old Alturas Road Bridge over Chum Creek Replacement or Rehabilitation Project for a not- to- exceed design fee of $350, 000. Further, authorize a contingency of 40,000, and authorize the City Manager to execute contract amendments for the contingency amount. This will allow staff the flexibility to refine the scope of services as needed to complete a project that is in the best interests of the City. ( Staff Recommendation)
2. Do not award the Request for Proposal No. 4507 at this time and direct staff not to pursue this project. This alternative will delay or eliminate the construction ofthe improvements. Since this bridge is designated as functionally obsolete, delaying or eliminating construction of this project will lead to increased maintenance costs as well as unsafe conditions for pedestrians.
3. Provide other direction to staff.
Fiscal Impact
All funds are allocated from the HBRR Program ( 88. 53 percent) and the TIF ( 11.47 percent). The total project cost is estimated in the $ 3 million range.
Conclusion
This bridge has been designated as " functionally obsolete" per Caltrans Bridge Inspection Reports.
Morrison has the necessary resources and expertise to provide the required services to prepare this project for construction. Therefore, staff recommends that the Council select Alternative I as listed above.
Attachment
A. Location map
CV:amf
Engineering\ StaffReports- RFP - OldAlturasBridge- ChurnCrk -CV -cC. wpd c: Chuck Aukland, Public Works Assistant Director
James Triantafyllou, Project Coordinator
Corri Vandiver, Associate Civil Engineer
Packet Pg. 171 Attachment: Previous Staff Report 2013 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
CITY OF REDDING
PUBLIC WORKS
DEPARTMENT
EXHIBITA
OLD ALTURAS BRIDGE OVER
CHURN CREEK
LOCATION MAP iTEM
Packet Pg. 172 Attachment: Previous Staff Report 2013 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) z
CITY OF REDDING
REPORT TO REDDING CITY COUNCIL
MEETING DATE: December 6, 2016
ITEM NO. 4. 11( i)
W- 020- 575]
FROM: Brian Crane, Public Works
Director
SUBJECT: 4. 1 l (i) --Adoption of Old Alturas Road Bridge over Churn Creek Mitigated Negative Declaration
APPROVED BY***
01 Frian rave, Public
V
orks Dire or 11/ 23/ 2016 Carman 11/ 281201
Recommendation
Adopt Resolution approving the Mitigated Negative Declaration and Mitigation Monitoring Program, and approving the Old Alturas Road and Churn Creek Bridge Rehabilitation Project as described, thereby satisfying the requirements of the California Environmental Quality Act CEQA Guidelines § 15074).
Background
The City of Redding Department of Public Works proposes to rehabilitate the existing four -span, 143 -foot -long by 28 -foot -wide reinforced concrete bridge over Churn Creek on Old Alturas Road. Rehabilitation would include widening the bridge deck, pier walls, and abutments, and widening the roadway on either side of the bridge. Approximately 88 percent of the project is funded by the federal Highway Bridge Program.
The first order of work will be completion of two temporary access roads across the channel for equipment and vehicles. The contractor may also create a temporary access pad beneath the bridge to be used as a road/work platform. The pad and access roads would be made up of clean, uncrushed, rounded river rock with no sharp edges; temporary culverts would divert any stream flows through the site. All temporary work pads and stream crossings would be removed during the winter months as approved by the various resource agencies.
Following completion of the access roads, the existing abutments would be extended to 67 feet.
The existing 1 - foot -wide pier walls would be extended to 66 feet, and ten 50 -foot -long, 30 -inch -diameter piles would be installed to provide support for the pier extensions. Rock slope protection would be placed 21 feet upstream and downstream of the new pier walls and be placed in a 15 -foot -wide zone around the abutments. Upon completion of work around the pier walls and abutments, the bridge deck would be widened. The new concrete bridge deck would measure 67 feet wide and would include a 14 -foot -wide center turn lane and two 12 -foot -wide lanes, each with an 8 -foot -wide shoulder and a 6 -foot -wide sidewalk with a barrier. Pile driving may be required for the placement of falsework piles and for the installation of sheet piles around the pier walls and abutments for dewatering purposes and as temporary retaining walls. The Packet Pg. 173 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Report to Redding City Council November 29, 2016
Re: 4.11( 1) -- Adoption of Old Alturas Road at Churn Creek Bridge Mitigated Negative Declaration Page 2
western and eastern approaches to the bridge would require ± 600 and ± 1, 000 feet of road work, respectively; this would include minor widening of the roadway near the bridge to match the width of the new bridge deck. New storm drains and catch basins would be constructed to adequately drain the improved roadway along the north side of both the east and west approach roadways and along the south side of the east approach roadway. In addition, affected driveways would be modified to conform with the new roadway.
Staged construction would be used to build the bridge while maintaining one lane of traffic in each direction; periodic traffic control may be required during critical construction events. An existing 12 -inch -diameter water line and a 4 -inch -diameter gas line would be relocated to the new edge of deck, and electric utilities would be relocated to the edge of the right- of-way. The project will require additional right-of-way to accommodate the new bridge and sewer line.
Temporary construction easements would also be required for construction access and staging.
Construction is planned for summer of 2018, with the goal of completing the project in one construction season. Two construction seasons may be required, however, depending on how early in the season construction begins, construction efficiency, coordination with utilities, and other factors.
An Initial Study ( IS) was prepared to satisfy the requirements of the California Environmental Quality Act (CEQA). It describes why the Project is being proposed and the potential impacts to the existing environment. The IS shows that the proposed Project could have a significant effect on biological and cultural resources, but with implementation of mitigation measures, those impacts will be reduced to a level considered less than significant. Mitigation measures to be implemented are common practices and include, but are not limited to biological preconstruction surveys, impact minimization, construction monitoring, exclusionary fencing, erosion control, on- site restoration, and off-site compensation.
Based on the conclusions made in the IS, a Mitigated Negative Declaration ( MND) was prepared. The MND describes the project, including mitigation measures, and makes the determination that there will be no significant effect on the environment provided that the defined mitigation measures are implemented as part of the project.
In addition, a Mitigation and Monitoring Program ( MMP) has been written and incorporated into the MND (CEQA Section 21081. 6). The MMP will be used by City staff, contractors, agencies, and monitoring personnel during and after the project to ensure effective implementation of the adopted mitigation measures outlined in the MND.
The IS/ MND/MMP documents were sent to the State Clearinghouse for a 30 day public review period and distribution to pertinent state agencies. They were sent to local resource agencies and the Shasta County Clerk, and posted on the Public Works Department website. A public notice was also sent to landowners in the vicinity of the project and posted in the local newspaper. One comment letter was received from the Department of Fish and Wildlife. A response to the comment letter has been prepared and is attached to the final MND.
The City of Redding is the lead agency for the Project pursuant to CEQA. As the lead CEQA agency, the City Council is authorized to adopt the MND per Redding Municipal Code Section I8.24.070.E and state law. Upon adoption of the MND and approval of the project by the City Council, a Notice of Determination will be filed with the Shasta County Clerk' s Office and the Packet Pg. 174 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Report to Redding City Council November 29, 2016
Re: 4.11( 1) -- Adoption of Old Alturas Road at Churn Creek Bridge Mitigated Negative Declaration Page 3
State Clearinghouse, completing the environmental review process. The IS/ MND is available in the City Clerk' s office for review.
Issue
Should the City Council adopt the attached resolution relative to the Old Alturas Road and Churn Creek Bridge Rehabilitation Project?
Alternatives; Implication ofAlternatives
The City Council has the option of selecting one of the following alternatives:
1. Adopt the attached resolution, thereby adopting the Mitigated Negative Declaration and Mitigation Monitoring Program and approving the Project as described. With this action, the Council will be in compliance with the requirements of the California Environmental Quality Act (CEQA Guidelines § 15074). ( Staff Recommendation)
2. Do not adopt the resolution and Mitigated Negative Declaration. Without approval of the environmental document, the project would not proceed forward as a City project.
Fiscal Impact
Adoption of the resolution allows the project to move forward towards the construction phase.
There is no fiscal impact as a direct result of adopting the MND and MMP.
Conclusion
Adoption of the MND and approval of the Project are necessary for the project to proceed. The environmental phase must be completed prior to the project moving forward towards construction.
Attachments:
Mitigated Negative Declaration
Resolution
Packet Pg. 175 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
PUBLIC WORKS
CITY OF REDDING
777 CYPRESS AVENUE, REDDING, CA 96001
P.O. BOX 496071. REDDING. CA 96049- 6071
ENGINEERING DIVISION
530. 225. 4170 MITIGATED NEGATIVE DECLARATION
530.245.7024
Old Alturas Road and Churn Creek Bridge Rehabilitation Project State Clearinghouse No.
SUBJECT
Old Alturas Road and Churn Creek Bridge Rehabilitation Project
PROJECT DESCRIPTION
The City of Redding Department of Public Works proposes to rehabilitate the existing four -span, 143 - foot -long by 28 -foot -wide reinforced concrete bridge over Churn Creek on Old Alturas Road.
Rehabilitation would include widening of the bridge deck, pier walls, and abutments, and widening of the roadway on either side of the bridge. As shown in Attachment A, the project area is located in the City of Redding, and is situated in Township 32 North, Range 4 West, Section 32, of the U.S. Geological Survey' s Enterprise 7. 5 -minute quadrangle.
The contractor would need two temporary access roads across the channel for equipment and vehicles, including excavators, loaders, pick-up trucks, etc. The temporary access roads, each approximately 25 feet wide, would be constructed on each side of the bridge and would consist of gravel. The contractor may also create a temporary access pad beneath the bridge to be used as a road/ work platform. The pad and access roads would be made up of clean gravel between 1 and 4 inches in diameter, and would consist of uncrushed, rounded river rock with no sharp edges; temporary culverts would divert any stream flows through the site. All temporary work pads and stream crossings would be removed during the winter months as approved by resources agencies.
Following completion of the access roads, the existing abutments ( located within the ordinary high water mark of Churn Creek) would be extended to 67 feet. The existing 1 - foot -wide pier walls ( also located within the ordinary high water mark of Churn Creek) would be extended to 66 feet, and ten 50 -foot -long, 30 -inch -diameter cast -in drill -holed ( CIDH) piles would be installed to provide support for the pier extensions. Rock would be used to fill scour holes around pier walls ( but would not extend above grade).
Rock slope protection would be placed 21 feet upstream and downstream of the new the pier walls and be placed in a 15 -foot -wide zone around the abutments. Upon completion of work around the pier walls and abutments, the bridge deck would be widened. The new concrete bridge deck would measure 67 feet wide and would include a 14 -foot -wide center turn lane and two 12 -foot -wide lanes, each with an 8 -foot - wide shoulder and a 6. -foot -wide sidewalk with a barrier. Pile driving may be required for the placement of falsework piles and for the installation of sheet piles around the pier walls and abutments for dewatering purposes and as temporary retaining walls. Vibratory and/ or impact hammer pile drivers may be used, depending on the structure being installed and the substrate type. The western and eastern approaches to the bridge would require ± 600 and ± 1, 000 feet of road work, respectively; this would include minor widening of the roadway near the bridge to match the width of the new bridge deck. New Old Alturas Rd and Churn Cr Bridge Rehabilitation Project Mitigated Negative Declaration Page I
Packet Pg. 176 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) storm drains and catch basins would be constructed to adequately drain the improved roadway along the north side of both the east and west approach roadways and along the south side of the east approach roadway. In addition, driveways within the ESL would be modified to conform with the new roadway.
Staged construction would be used to build the bridge while maintaining one lane of traffic in each direction; periodic traffic control may be required during critical construction events. An existing 12 - inch -diameter water line and a 4 -inch diameter gas line would be relocated to the new edge of deck, and electric utilities would be relocated to the edge of the right-of-way. The project will require additional right- of-way to accommodate the new bridge and sewer line. Temporary construction easements would also be required for construction access and staging. Up to four construction staging areas could be utilized for the site; no disposal or borrow sites would be needed. Construction is planned for summer of 2018, with the goal of completing the project in one construction season. Two construction seasons may be required, however, depending on how early in the season construction begins, construction efficiency, coordination with utilities, and other factors.
ENVIRONMENTAL SETTING
The project is located within and surrounded by residential development with commercial businesses located within %2 mile. Old Alturas Road is an important traffic corridor between commercial areas to the west and residential developments near the project and eastward. As such, this segment of road receives high vehicle traffic on a daily basis. The project is situated approximately 550 ft above sea level, and is characterized by hot, dry summers and cool, wet winters. At the nearby airport, the average annual precipitation is approx. 33 inches, with most of the rainfall occurring between October and May.
FINDINGS AND DETERMINATION
The City of Redding conducted an Initial Study ( attached), which determined that the proposed project could have significant environmental effects. Subsequent revisions in the project proposal create the specific mitigation measures identified below. The revised project avoids or mitigates the potentially significant environmental effects identified, and the preparation of an environmental impact report will not be required. There is no substantial evidence, in light of the whole record before the City, that the revised project may have a significant effect on the environment. Ifthere are substantial changes that alter the character or impacts of the proposed project, another environmental impact determination will be necessary.
The project includes measures to mitigate potentially significant impacts to biological and cultural resources. Prior to approval of the project, the lead agency may conclude, at a public hearing, that certain mitigation measures identified in the Mitigated Negative Declaration are infeasible or undesirable. In accordance with CEQA Section 15074. 1, the lead agency may delete those mitigation measures and substitute other measures which it determines are equivalent or more effective. The lead agency would adopt written findings that the new measure is equivalent or more effective in mitigating or avoiding potential significant effects and that it, in itself, would not cause any potentially significant effect on the environment. i. Based on the whole record ( including the Initial Study and any supporting documentation) and the mitigation measures incorporated into the project, the City of Redding has determined that there is no substantial evidence that the project will have a significant effect on the environment.
Old Alturas Rd and Churn Cr Bridge Rehabilitation Project Mitigated Negative Declaration Page 2
Packet Pg. 177 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
2. The Mitigated Negative Declaration, with its supporting documentation, reflects the independent judgment and analysis of the lead agency, which is the City of Redding.
DOCUMENTATION
The attached Initial Study documents the reasons to support the above determination.
MITIGATIONMEASURES
B- 1. In -water construction activities, and all pile -driving activities in Churn Creek, will be limited to the period between June 1 and October 31, or as may otherwise be specified through jurisdictional permits and approvals issued by the NMFS, CDFW, ALOE, and/ or RWQCB. If work is proposed outside of the agency -approved work windows, the City will obtain approval from those agencies prior to conducting such work, and implement any additional measures that may be required. In -water pile driving will only be conducted during daytime hours defined as beginning one- half hour after sunrise and ending one- half hour prior to sunset, or as defined by resource agency permits and approvals.
B- 2. Temporary work pads or crossings within the stream will be constructed using clean, washed, rounded gravel, 1- 4 inches in diameter, and will meet the Caltrans gravel cleanliness specification No. 85. Unless otherwise approved by the Engineer, upon completion of the project, all gravel, including any contaminated gravel, will be removed from the creek bottom, except for the last 6 inches of clean, uncontaminated gravel will be left in place to prevent erosion and protect original streambed conditions.
B- 3. All temporary use areas will be restored to preconstruction conditions providing the same or higher density of native woody riparian species, in accordance with the Riparian Restoration Plan - Old Alturas Road Bridge Rehabilitation Project at Churn Creek. Existing woody vegetation will be pruned at ground level prior to work and protected during construction to allow regrowth upon completion of the project.
B- 4. Environmental Sensitive Area ( ESA) fencing will be placed to minimize impacts and prevent unnecessary excursion into protected areas ofthe creek.
B- 5. A Storm Water Pollution Prevention Plan ( SWPPP) will be prepared for the project which will outline Best Management Practices ( BMPs) for erosion control and spill prevention.
Implementation of BMPs will minimize the potential for adverse impacts to fish, water quality, and the aquatic ecosystem.
B- 6. Preconstruction surveys for western pond turtles will be conducted by a qualified biologist immediately prior to the start of in -water work each day that in -water work occurs. Any western pond turtles, or foothill yellow -legged frogs, eggs masses, or tadpoles that are also found, will be relocated to a safe location upstream or downstream ofthe work area.
B- 7. Preconstruction surveys for nesting migratory birds will be conducted if vegetation removal or activities affecting swallow nesting on the existing bridge occurs between March 1 Old Alturas Rd and Churn Cr Bridge Rehabilitation Project Mitigated Negative Declaration Page 3
Packet Pg. 178 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) and August 1. A qualified biologist approved by the Engineer will determine if nests are present on the bridge and if work activities are affecting nesting. Surveys will be conducted within 3 days prior to the proposed work. If nesting birds are found, the nest site shall not be disturbed until after the young have fledged. If an active raptor nest is present, no vegetation removal or construction activities will occur within 250 feet of the nest, unless a smaller buffer zone is authorized by the CDFW. Appropriate buffer zones may be established for other nesting birds by a biologist approved by the City. The City may utilize a variety of measures to prevent birds from nesting on the bridge, including the use of bioacoustic deterrents ( e. g., broadcast calls), installation of exclusionary materials ( e. g., Teflon or plastic sheeting or other materials that would not entangle birds) in the winter prior to construction, or removal of partially constructed nests following confirmation by a qualified biologist that no eggs or chicks are present completed nests must not be removed).
B- 8. All required permits and authorizations shall be obtained from state and federal resource agencies prior to any construction activities within Waters of the U.S. All terms and conditions of the required permits and authorizations shall be met.
C -l. Environmental Sensitive Areas (ESA) will be established at the project site as delineated in the ESA Action Plan, prepared for and approved by Caltrans who has lead authority over cultural resources pursuant to federal law.
C- 2. A qualified archaeologist and Native American will monitor excavation and initial ground disturbing construction activities in the portion of the APE within 100 ft of known cultural sites, or as defined in the ESA Action Plan. If intact cultural deposits are found, all work shall cease in the area, and the archaeologist shall recommend appropriate conservation measures to be implemented prior to re-initiation ofthe work.
C- 3. In the event archaeological deposits are discovered during project activities anywhere on the project site, all work in the vicinity of the discovery shall be stopped immediately and the resident engineer and archaeologist notified. The archaeologist shall recommend appropriate conservation measures to be implemented prior to re-initiation ofthe work.
C- 4. If human remains are discovered during project activities, all work will stop in the vicinity of the find and the Shasta County Coroner' s Office shall be notified. Treatment of the remains shall be conducted in accordance with the direction of the Coroner and/or the Native American Heritage Commission, as appropriate.
Draft copies or notice of this Mitigated Negative Declaration were distributed to:
State Clearinghouse
Shasta County Clerk
California Department of Fish and Wildlife
U. S. Army Corps of Engineers
Regional Water Quality Control Board
All property owners along affected streets and within 300 ft Old Alturas Rd and Churn Cr Bridge Rehabilitation Project Mitigated Negative Declaration Page 4
Packet Pg. 179 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
PUBLIC REVIEW
Draft document referred for comments
No comments were received during the public review period.
Comments were received but did not address the draft Mitigated Negative Declaration findings or the accuracy/ completeness of the Initial Study. No response is necessary. The letters are attached.
Comments addressing the findings of the draft Mitigated Negative Declaration and/ or accuracy or completeness of the Initial Study were received during the public review period. The letters and responses follow (see Response to Comments, attached).
Copies of the Mitigated Negative Declaration, the Initial Study, documentation materials, and the Mitigation Monitoring Program may be obtained online at http:// www. cilyofredding. ore/ departments/ public- works, and from the Public Works Department, City of Redding, 777 Cypress Avenue, Redding, CA 96001. Contact:
Jonathan Oldham, Environmental Compliance Manager, 530- 225- 4046 10- 18- 16
Date of Draft Report
Date of Final Report
Jonathan Oldham
Environmental Compliance Manager
JO: sm
Attachments:
A. Location map
B. Initial Study
C. Mitigation Monitoring Program
D. Comments and Response to Comments (if any)
Old Alturas Rd and Churn Cr Bridge Rehabilitation Project Mitigated Negative Declaration Page 5
Packet Pg. 180 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) SpOTy
R p F
0 yG O
o
s
PROJECT
LOCATION
Opp
A TORAS Rp
pANA pR
v
o cy
o GA
ARROYO
o
Q o
v
Q
MA OR OR
oF Re CITY OF REDDING EXHIBIT A
OLD ALTURAS BRIDGE OVER
PUBLIC WORKS
DEPARTMENT
CHURN CREEK
LOCATION MAP
Packet Pg. 181 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
CALIFORNIA ENVIRONMENTAL QUALITY ACT
INITIAL STUDY
OLD ALTURAAS ROAD AND CHURN CREEK
BRIDGE REHABILITATION PROJECT
Prepared by:
CITY GP REDDING
Publi;
press
Warks Department
777 ( Avenue
Redding, California 96001
OCTOBER 2016
Packet Pg. 182 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
PROJECT INITIAL STUDY
1. Project TitIG_ Old Alturas Ruad and Chuan Crock Bridge Rehabilitation Project
2. Lead Agency Name and Address: City of Redding Public Works Department, 777 Cypress Avenue, Redding, CA 96001
3. Contact Put -sun and Phone Number: Jonathan Oldham, Environmental Compliance Manager, ( 53U) 225- 4U46
4. Project Location: On Old Alturas Road between Edgewood Drivc and Victor Avenue, Redding, Shasta County, California.
5. P. iijeut Sponsor' s Name and Address: City of Redding, 777 Cypress, Avenue, Redding, CA. 96UU 1
6. general Plan Designation: Residential: 2 - 3. 5 units per acre Residential: lU - 2U units per acre
Ureenway
7. Zoning= Open Space ( OS)
Milled Residential ( RM -12)
Single Family Residential ( RS -3)
8. Description of Project:
The City of Redding Department of Public Works proposes to rehabilitate the existing four -span, 143 -foot -long by 28 - toot -wide reinforced concrete bridge over Churn Creak or, Old Alturas Road. Rehabilitation would include widening of the bridge deck, pier walls, and abutments, and widening of the roadway on either side of the bridge. As shown irr Attachment A, the project area is located in the city of Redding, and is situated in Township 32 North, Range 4 West, Section 32, of -the U. S. Geological Survey' s Eiacrpribe 7. 5- rrrirrute quadrangle. the contractor would need two temporary access roads across the channel for equiprrreut and vehicles, inuludiug excavators, loaders, pick-up trucks, etc. the temporary access roads, each approximately 25 feet wide, would be constructed on each side ofthe bridge and would consist of gravel. The contractor may also create a temporary access pad beneath the bridge to be used as a roadwork platforrrn. The pad and access roads would be made up of clean gravel between 1 and 4 inches in diameter, and would consist of uncrushed, rounded river rock with no sharp edges, temporary culverts would divert any stream flows through the site. All temporary work pads and stream %aussurgs would be removed during the winter months as approved by resources agencies.
Followirng completion of the access mads, the emoting abutlncrrtni ( located within the ordinary high water mark of Churn Creek) would be emended to 67 feet. The existing 1 - tout -wide pier walls ( also located within the ordinary high water mark of Churn Creek) would be extended to 66 feet, and ten 5u -toot -long, 3U -inch -diameter cast -in drill -holed ( C1DH) piles would be installed to provide support for the pier extensions. Rock would be used to fill scour holes around pier walls ( but would rrut catcnrd above grade). Rock slope protection would be placed 21 feet upstream and downstream of the new the pier walls and be placed in a 15 -foot -wide zour, around the abutments. Upon corrrpletion of work around the pier walls and abutments, the bridge deck would be widened. the new concrete bridge deck would rurwasurO 67 feet wide and would include a 14 -foot -wide center turn lane and two 12 -toot -wide lanes, each with an 8 -toot -wide shoulder and a 6.- tuot- wide sidewalk with a barrier Pile driving may be required for the placement of falsework piles and for the installation of sheet piles around the pier walls and abutments for dewatering purposes and as temporary retaining walls. vibratory and/ or impact hammer pile drivers pray be used, depending ou the structure being installed and the substrate type. The western and eastern approaches to the bridge would require f6UU and ± 1, 000 feet of road work, respectively; this would iucludu minor widening of the roadway near the bridge to match the width of the new bridge deck. New storm drains and catch basins would be constructed to adequately drain the improved roadway along the north side of both the east and west approach roadways and along the south side of the cast approach roadway. In addition, driveways within the ESL would be modified to conform with the new roadway. ( See Attachment B.) utanit- im. a— if uti.— rrojVCt1,,X. 16ruay 2 Packet Pg. 183 October 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Staged construction would be used to build the bridge while maintaining one lane of traffic in each direction; periodic traffic control may be required during critical construction events. An existing 12 -inch -diameter water line and a 4 -inch diameter gas III= would br, relocated to the crew udgv of dock, acrd uluctric utilitius would be , located to the edge of the right- of-way. The projuct will rvquiry additiunal right- ut- way to accounnud-ate thu uvw bridge acrd svwvr Brio. Tumpurary currstructiurr easements would also be required for construction access and staging. Up to tour construction staging areas could be utilised for the site; no disposal or borrow sites would be needed. construction is planned for summer of 2U18, with the goal of completing the project in one construction season. Iwo construction seasons may be required, however, depending on how early in the season construction begins, construction efficiency, coordination with utilities, and other factors. 9 Surrounding Lana uses and settings: the project is located within and surrounded by residential development with commercial businesses located within '/ z mile. Old Alturas Road is an important traffic corridor between commercial areas to the west and residential developments near the project and eastward. As such, this sugruent of road rccuivvs high vehicle traffic err a daily babib. Thu prujvui ib bituatud appivairriatvly 550 ft above sea lvvvl, and is characterized by hut, dry summers and cool, wet winters. At the nearby airport, the average annual precipitation is approx. jj inches, with most of the rainfall occurring between uctober and May.
IO. Othcr public agenvics whusc appruval is regulrcd (C. g., pCX-mits, financing appruval or participation agreement).
CvntraI VaIIey Regional Water Quality CuntruI Buard
Cdlifornia llepa trent of Fish and Wildlife
U. S. Army Curps of Engineers
California uepartment of Transportation
National Marine Fisheries Service
ENVIRONMEN iAL FACTORS POTENTIALLY AFFECTED
the environmental factors checked below would be potentiaa-Ily affected by this project, involving at least one impact that is a " Potentially Significant Impact" ur "PutvntialIy Significarn Unless Mitiganun Incurpurated" as indicatvd by the chvcklibt un the fullo wing pages.
Ll AestheticN
Agricultural Resources
Air Quality
X Biological Resources
X Cultural Resources
Ll GeoIugy arrd SuiIb
Greenhouse Gas Emissions
Hazards ( Fire) and Hazarduus
Materiaals
HydruIugy acrd Water ( duality
Land Use and Planning
MineraI Rcsuurcvs
Noise
Population and Housing
DE,rEKmINA1,iON (To be completed by the Lead Agency)
On the babib of thio initial cvaluatiun:
Public Services
Recreation
Ll Traaspurtauunn7CircuIation
Utilities and Service Systems
U Mairdatury Findings of
Significance
I find that the prupused project COULD NOT have a bignificant effect un the envirunment, and a NEGATIVE DECLAKATIUN will be prepared.
I find that althuuggh the proposed project could have a significant effect on the environment, there will not be X a significant effect in this case because the mitigation measures described in this Initial Study have been added to the pruject. A MITIGATED NEGATIVE DECLARATION will be prepared.
I find that the propused project MAY have a sigruficaut effect on the envirumncnt, and an ENVIRONMEN I AL IMPAC I Xh.PUKI is required.
utaAItU K—a m a cm.,,. c. eek n,. age Kennb; Ytnr; o„ Yr jest 4. GaI atudy s Packet Pg. 184 October 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) I find that the proposed project MAY have a significant effects) on the environment, but at least one effect I) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and ( 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets, ifthe effect is a " potentially significant impact" or " potentially significant unless mitigated." An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.
I find that although the proposed project could have a significant effect on the environment, there WILL NOT be a significant effect in this case because all potentially significant effects ( a) have been analyzed adequately in an earlier EIR pursuant to applicable standards and ( b) have been avoided or mitigated pursuant to that earlier EIR, including revisions or mitigation measures that are imposed upon the proposed project.
1 ' i
5 Jonathan Oldham
Name)
k- --
Date
Environmental Compliance Manager
Title)
U1d Ahuras Road and Churn Creek Bride Rehabilitation Yrojeci lnitial Mudy 4 Packet Pg. 185 October 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) EVALUArtON OF ENVIRONMENTAL IMPACTS
This scution analyzes the putential environmental impacts associated with the proposed project. The issue areas evaluated in this initial study include:
Aesthetics
Air Quality
Biulugival Resuurucs
Cultural Resources
Geology amid Soils
Greenhouse Gas Emissions
Land Use and Planning
Mincral RwuLaucb
Noise
Population and Housing
Public Services
Reurcatiun
Hazards and Hazardous Materials Transportation/ Circulation Hydrology m-ld Water (duality Utilities and Service Systems The environmental analysis in this section is patterned after the Initis@ Study Checklist recommended by the CEQA Guidelines and used by the City of Redding in its cnvirumm ental review process. For the prclumiiiary environmental assessinent undertaken as part of this Initial Study' s preparation, a determination that there is a putcntial for signifwant effuuts indicates the need to more fully analyze the development' s impacts and to identify mitigation.
Fur the evaluation of putential impacts, the questions in the Initial Study Checklist are stated and an answer is provided according to the analysis undertaken as part of the Initial Study The analysis considers the lung -term, direct, indirect, and cumulative impacts of the development. To each question, there are four possible responsesNo Impact. The development will not have any measurable environmental impact un the envirunmunt_ Less Than Significant Impact. The dcvclupment will have the potential fur impacting the enviroImment, although this impact will be below established thresholds that are considered to be significant.
Potentially Significant Impact Unless Mitigation Incorporated. 1he development will have the potential to generate impacts which may be cunsidered as a signiticanit effect on the environment, although mitigation measures or changes to the development' s physical or operational uharautcristics uan reduce these impacts to levels that are less than significant.
Potentially Significant Impact. The development will have impacts which are considered significant, and additional analysis is required to identity mitigation measures that could reduce these impacts to less than significant levels.
Where potentiaal impacts are anticipated to be significant, mitigation mcasures will be required, so that impacts may be avoided or reduced to insignificant levels.
List of attachments:
A. Project Location Map
B_ Project Area of Potential Effects
Prior en vironmental evaluations applicable to all orpart ofthe project site:
L City of Redding General Plan Filial Environmental Impact Report, 2000, SCH # 1998072103 utantt,.,— ttoaar a Chu,,. 17... P, oject J,, XUl6Yuay 5 Packet Pg. 186 October 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
INITIAL STUDY CHECKLIST
Potentially
Significant
Potentially Unless Less Than
Significant Mitigation Significant No
Issues ( and Supporting Information Sources): Impact Incorporated Impact Impact
1. AESTHETICS. Would the proposal:
a. have a substantial adverse effect on a scenic vista? U A b. Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and histw it; buildings within a state scenic U a highway?
C. Substantially degrade the existing visual character or quality ofthe site Li and its surroundings?
d, Create a new source of substantial light or glare which would u U l24
adversely affect day of nighttiinic views un the area?
Discussion
a_ the project will not obstruct any documented scenic vistas or represent a significant change to the overall scenic quality of the area
b. The piujcut site is uUt luLated adjauont to a state- designiatud sueniu highway. c. the project is compatible with the existing visual character ofthe property and its surroundings. d. Thv pnojuiit will uut add any now suurires of substantial light of g1aiv.
Documentation
City ofRedding General Plan Natural Resources Element, 2000 City of Redding Zoning Ordinance Chapter 18. 40 090
Mitigation
None necessary.
Potentially
r
Significant
Potentially Unless Less Than
Significant Mitigation Significant No
Issues aupportin Iiaformation Sources f impact Incorporated Impact imact
11. AGRICULTURAL RESOURCES_ Would the proposal:
a. Convert Prime Farmland, Unique Farmland, of Farmland of Statewide Importanuo ( Farmland), as shown on the Hoops prepancd pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non- agricultural use'l
b. Couthut with existing zoning for agricultural use, or a Williamson act contract' 1
u. Involve other changes in the existing environment which, due to their luuation or nature, could result in conversion of Farmland, to non- u u l21 agricultural use?
Discussion
a, b, c. the project site has not been historically used for agricultural purposes, nor does it possess soils that are prime for agricultural production.
Old Alturas Road and Churn Creek Bridge Rehabilitation Project Initial Study 6 Packet Pg. 187 Octobe, A16 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) I]tocumeatatlon
City of Redding Cie„ cral Plana Backgound Report, Chapter 9. 4: Agricultural Lands United States Department OfAgriculture, Soil Conservation Service and Furest Serviuc, Soil Survey of Shasta County Area
Mitigation
Nu„ e neuessa, y.
III. AIx QUALI' T' Y. Would the proposal:
a. Conflict with or obstruct implementation of the applicable au quality Potentially
plan?
Significant
Potentially Unless Less Than
significant t
eaistinrg or projeuted air quality violation?
Im act
Tui'
cE ars
III. AIx QUALI' T' Y. Would the proposal:
a. Conflict with or obstruct implementation of the applicable au quality plan?
b. Violate any air quality standard or contribute substantially to an eaistinrg or projeuted air quality violation?
c. Result in a uuirulatively corrsAciable „ ct inureasc of any criteria pollutant for which the project region is non -attainment unde, au applicable federal or state ambient air quality standard ( including l24 releasing emissions which exceed quantitative thresholds for ozone precursors)?
I Eapusc sensitive ncueptors to substautial pollutant uuiuenitratious? CH e. Create objectionable odors affecting a substaitial number ofpcople? CM Discussion
a, b, c. Shasta County, in, uludu,g the far northern Sacramento Valley, currently exceeds the state's ambient standards for uz,onc ( sirug) turd paliiuulatus ( tune, au bottle paMi iulcs). Consequently, these pollutants are the focus of local air quality policy, especially when related to land use and transportation planning. haven with applivatio„ of incabuncs to reduuc emissions for individual projects, cumulative impacts are unavoidable when ozone and/ or particulate emissions aro involved. For example, the primary source of emissions contributing to ozone is from vehicles. Any project that generates vehicle trips has the potential of contributing incrementally to the problem. The Environmental impact Report for the General Phu, acknowledged and addressed this issue.
Under policies of the General Plan Air Quality Element, a project has the potential to impact air quality primarily in two ways: ( 1) the project would generate vehicle -trip emissions ( with NOx, ROG, and PM,,,) that contribute cumulatively to local and regional air quality uurrditiuns; and ( 2) fugitive dust ( paUt iuulate/PM,J emissions are possible during construction activities. Application of standard air quality reductiun rrrcasures arc ruquBcd in order to strive toward the General Plan policy of a net reduction objective of 2u percent to address small- scale cumulative effects. In addition, pertinent SWPPP BMWs as discussed in Section vi and lx would be applied as necessary to address fugitive dust control.
These require, rtetits are standard development and construction regulations used by the City, promulgated in the Redding Mu„ aupal Code aid C:alitbi nia Buildu,g Code, and apply to all projects involving grading and/or earth disturbance. At a minimum, the following standard regulations would apply during grading and coistruution activities to uoutrul dust and PM,o emissions during the project. Additional BMPs detailed in the project -specific S WPPP prepared at the lane of construction would also apply.
1. No„ tu&iu soil stabilizers shall be applied auuu, dirrg to nttanufautu, cr' s specification to all inactive construction areas previously graded areas inactive for 10 days or irorc).
2. All grading operations shall be suspended when winds ( as instantaneous gusts) exceed 20 miles per hour.
3. temporary traffic control shall be provided as appropriate during all phases of construction to improve traffic flow c. g., tlag ponsorr).
01dAltu— K - d and Churn Creek Bridge Rehabilitari„ n rje.,t i„ itinl Study i Packet Pg. 188 Ocrobur 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
4. Construction activities that could substantially attect trRTic flow shall be scheduled in off-peak hours.
5. Active construction areas, haul roads, etc., shall be watered at least twice daily or more as needed to limit dust.
6. Exposed stockpiles of soil and other backfill material shall either be covered, watered, or have soil binders added to inhibit dust and wind eiosioll.
7. All truckb hauling soil acid uthur loobe material shall bo covered or bhuuld maintain at lcubt 2 tevi oftrcoboard (ix., minimum vertical distance between top of the load and the trailer) in accordance with the requirements of C V C Section 23114. This provision is enforced by local law enforcement agencies.
8. All public roadways used by the project contractor shall be maintained free from dust, dirt, and debris caused by comirmaiou autiviTicb. STruutb bhall be bwcpt at the cud of the day if vibiblc buil watmialb arc carriod oiao adjauctit public pavcd ioadn,. Whcol wabhcrb or Gquivalcnnt 13MYz, shall be ubud where vchiuleb cnTcr and Gait utipaved ruadb onto paved roads, or trucks and any equipment shall be washed off leaving the site with each trip_
9. Alternatives to open burning of cleared vegetative material on the project site shall be used unless otherwise deemed Infeasible by the City. Suitable alternatives include, but are slot limited to, oii- site chipphig and mulullhig and/ or hauling to a biomabb fucl bitc.
d, e_ the proposed project will not result in substantial pollutant concentrations or expose people to objectionable odors.
Documentation
ShmTa County APCD Air Quality Mauntcuancc Plan and lmplcuncuting Mcaburcni Redding Cictmial Plan Environmental impact Report, 2000 Redding cieneral Plan Natural Resources and Air duality Elements, 2uuu City ofRedding Construction Standards
Mifigailou
None necessary.
r
Potentially
Significant
Potentially Unless Less Than
aificant h4i tion . Significant No
Issues and S ae.
1V. BIOLOGICAL RESOURCES. Would the proposal:
a. Have a substantial adverse effect, either directly of through habitat ll odificatiotis, oi, any species identitied as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, a or by the California vepartment of i ish and wildlife or U. S. Fish and wildlife Service?
b_ Have a substantial adverse effect on any riparian habitat u, other bc11biTivc 11awral cutiunulnity identified in local or regional plans, c. Have
wildlife
a substantial
regulations
or u. s. rish
adverse
or
and
by
wildlife
the
effect
California -
on
service?
federally
Department
protected
of
wetlands
rish and
as
Ll A
L
defined by Section 404 ofthe Clean Water Act (tilVludlllg, but iiVT ini LN
iiiTcd To, liiarbh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means' l
d. interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established Native iesideia yr migrarly wildlife roti do, A, o, impede the ube of native wildlife utubury sites'?
e. Conflict with any local policies or ordinances protecting biological La resources, such as a tree preservation policy or ordinance? EM7A1tnrdc lt—a a„ a (.h— C, VVK B age nEn. nttltut;— I.,,T;. 161ady 8 Packet Pg. 189 October 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Potentially
Significant '
Potentially Unless Less Than
Significant Mitigation Significant No
Issues and Supporting Information Sources): Impact Incorporated Impact Im act f. Conflict with the provisions of an adopted Habitat Conservation Plan, Natuial Community C:unscrvatiu,i Plan, ur uthcr approved local, U U ca reglu„ al, ui state habitat uunse, vatiu„ plan!
lliscussion
a, d. Salmonids. Fall -run Chinook salmon and late -fall -run Chinook salmon are both considered Species of Special Cuncum by the National Marine 1~ ishc, ius Service and the State Department ofFish and Wildlife. Central Valley steelhead are considered to be Federally Threatened wider the 1~oderal Ei dangered Species Act. Churn Crock supports a lu iitcd number of these salmonids at different times of the year. luring winter and spring when flows are adequate and water temperatures are less than 25° C, adult Chinook salmon ( fall -run and late -fall -run) and Central valley steelhead have a high potential to migrate through the ESL to spawn iii suitable habitats upstream. Additionally, juvenile Chinook salmon tall -run and late -tall -run) and steelhead have a high puteiiiial to utllizu Chu„ Creek withui the ESL tai natal and uuunatal rearing. Although no salmonids were tound during held studies of the ESL, the proposed work has the potential to directly and indirectly affect Central valley steelhead, fall -run and late -fall -run Chinook salmon, the primary constituent elements ( PCEs) of critical habitat for Central Valley steelhead, and essential fish habitat ( EFH) for the fall -run and latetall-ruii. Thcsc cMuts uuuld uucu, as it , csult of bridge pica/ abutme, iT uuiistructiuu and concomitant streambed loss, inbtallatiui, of the temporary uunstructiun aucess roads and gravel pad, riparian vugumtiuu , uniuval, pile d, ivi„ g, and increased sedimentation in the stream system.
Direct effects on salmonids are not expected to occur given the work windows and other avoidance and minimization uicabuicb p, upuscd. T'hc iii- watc, wuik window du, ii,g the warm sunnnc, u,uuths is designed to avoid dircut cttircts on salmo„ ids that may be present at other times ofthe year. indirect ettects on salmonids could potentially occur if sedimc„ is or other pollutants enter Churn Creek and degrade rearing habitat in the hSL and/ or spawning habitat downstream. in addition, riparian scrub removal along Churn Creek could contribute to a reduction in the invertebrate food supply, elevation of water temperatures, and impairment of water quality. Potential indirect effects on salmonids due to sediments u, pollutants cutc, ing Chun, C; rcck can be avuided/,,, inlmized with implcuic„ tatiu„ ut _Bust Managcu, c„ t P, actiuus to, erosion control and spill prevention.
Potential indirect effects on salmonids due to removal of riparian vegetation are expected to be negligible because: the amount of i, ivertebiate food puie, itially uuutributcd to Churn Crock by the impacted vegetation is not substantial, the new biidgc duck would pruvidu n, ure shade to Churn Creek than the existing brid& c presently docs mud would mute than ottact any potential loss of shade; and planting native riparian vegetation in temporarily disturbed areas and in rip -rap around the bridge supports would stabilize the stream bank and minimize the introduction of sediments into Churn creek, which would i ninimizu potential innnpauts to water quality.
Construction of the temporary access roads and gravel work pad could potentially disrupt stream flow and tisk migration corridor connectivity. installation of culverts to maintain flow will ensure that upstream and downstream migration of salmonids and other aquatic life is not affected.
Thu Mucied strearnbed and corresponding water column in Chun Creek mulude the tolluwing PCEN of uridual habitat that are essential tot the conservation of Central valley steelhead: treshwater rearing sites and treshwater migration corridors. ( liven the negligible loss of these two PCEs in the ESL and the extent of these two .FChs elsewhere in Churn Creek, in -water work would have a negligible effect on critical habitat for Central valley steelhead.
Thr, effects of the piujuct un Central Vallcy sicclhund, fall -tun Chinook salmon, laic -tall -run Chinook salmon, PC:ES of critical habitat for Central Valley steelhead, and hl ti for the tall -run and late -tall -run could potentially be signiticant, however, the effects will be considered less than significant given implementation of the mitigation measures described below.
Old Alturas Road and Chum Creek Bridge Rehabilitation Project Initial Study 9 Packet Pg. 190 October 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Western Pond Turtle. The western pond turtle is a Sia a Spekaus of Special Concern. It' s found in ponds, rivers, streams, ditches, and sloughs up to 6000 It in elevation. 1t prefers ponds ur slow , nuving streams with deep puuls. Pond turtles are known to be present in Churn Creek, and although they were not observed during field surveys of the p, oje; t area, thuic is a high potential for them to forage or disperse through the area during the spring and summer months.
Potential direct effects on pond turtles uuuld uut.;u, if they are piuscui duiuig u, -ware, work activities. If present, the animals could be trapped or injured/ killed as a result of being crushed by construction equipment u, by plalcn, cni of construction -related materials. Potential indirect effects include habitat degradation if sediment -laden water enters Churn C, cek. The effect of the project on pond turtles is considered to be potentially significant; however, the effects will be Uu„ sidu, ud less than significant given implementation of the mitigation measures described below r'oottiill Yellow -Legged k'rog. The foothill yellow -legged frog is a State Species of Spc,.;ial Concern. It inhabits mucky, perennial streams and rivers_ During the summer months, frogs prefer stream channels that provide exposed basking sites acid cool bhady areas. Although the frogs have not been reported in Churn Creek, they have been reported in watersheds north of Redding. No frUgb wc, c 5ccu du, il,g field studies for the p, oject. The site has a low potential to provide the habitat required for the frogs.
Potential direct effects on foothill yellow -legged frogs ( including their egg masses and tadpoles) could occur if frogs are pmcsent in in -water work areas during construction. If present, the animals could be trapped or injured/ killed as a result of being u, ubhcd by construction equipment or by placement of construction -related materials. Potential indirect effects include habitat degradation if sediment - laden watc, ente, s Chun, C, cck.
Given the lack of frogs in the project area, the low potential for them to occur in the project area, and the low potential for suitable habitat, the effect of the project on the frogs is considered to be less than significant_ However, measures implun,unrd tu, the wvbwin pend turtle will help ensu, r. theme is no pate„ tial fom advemse affects on the frogs. Any frogs, egg masses, or tadpoles will be relocated to a sate location upstream or downstream of the wu, k area.
Western Red Bat. The western red bat is a state Species of Special Concern_ western red bats typically forage and roost i„ , iparian habka[ s and arc strongly asbui; iatcd with mature ,; parian habitats that are over 50 meters wide. Roosting is expected to ueeur primarily in the largest , ipar1an trees, pam[ ieularly i„ sy.; amuics and uuuu„ wuuds. ' Ibc bat has been reported approximately 1 U miles southwest of the hSL. Kiparian vegetation in the ESL may provide marginally suitable foraging and roosting habitat for the bat. vegetation removal may result in a minor loss of potential foraging and roosting habitat for the bat
liven that there is a low potential for this bat to be p, usunt at the p, ujcut situ, the potential c$ evis of the piujcct on the western red bat are considered less than significant_ However, to ensure that western , ed bats and other bats of conce, n are not adversely affected during project construction, a bat survey will be conducted by a qualified bat biologist prior to the start of construction_ If bats are found to be roosting in the ESL, appropriate measures shall be prescribed by the bat biulug; st to c„ su, c that b, idge demolition and , iparian vegetation mcmoval do not mesult in take of bats.
Migratory lairds. 1he federal Migratory turd Treaty Act requires that nesting migratory birds not be affected by human activities. No active bird nests were observed in the ESL during the field inspections, although several bird nests constructed in p, iom nesting seasons were observed in trees upstream of the bridge, just outside the ESL. Nesting mgmatu, y buds, , f p, cscut i„ futu, c „ cbi;ug scasous, could be di,eudy o, i„ di, cctly affected by vegetation me,,, oval and construction activities.
Direct effects could include mortality resulting from removal of vegetation containing an active nest with eggs or chicks.
Indirect effects could include nest abandonment by adults in response to loud noise levels or human encroachment, or a cduaion u, the amount offood available iv young buds duc to i hangcs u, teeding bchaviu, by adults. Uivc„ the pveGniial for the project to impact nesting migratory birds during construction activities, the effects of the project are conside, ed to be potentially significant; however, the effects will be considered less than significant given implementation of the mitigation measures described below
aldAltum. Road mea C7hH Cr6eK/ SnHge Stuay 10 Packet Pg. 191 Oclobe, - 1016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) b. Implementation or the project will RTect Churn Creek and riparian scrub habitat along the creek. Extension of the bridge piers and abutments, installation of bridge supports, and placernvrrt of rock slope protcUiuu under the bridgr. will result in the permanent fill of approx. 0. 08 ac of Churn Creek. the project would also permanently impact about U. U7 ac or riparian scrub vegetation within the ESL. There would also be approximately 0. 03 ac of riparian scrub temporarily impautcd by plaucruout of a wurpurary auuuss road and work pads in the creek.
Although these impacts are not considered significant, measures will be implemented to rcduuc and rrrirrurrizc adverse project effects to the extent feasible. temporary use areas will be restored to preconstruction uonditiuns, iriuludnrg revegetation providing the same or higher density of native woody riparian species, in accordance with the Riparian Rayroratior, Play, - Uld Alturas Ruad Bridge Rehabilitation Project at Churn Creek.
C_ A wetland delineation was conducted within the ESL to determine if wetlands arc piescra. The study drtcuuured there are no wetlands present within the ESL.
e, L The City has adopted a ' 1'rc ' Yivsci vatiuu Urduranuc ( Chapter 18. 65 of the Redding Municipal Code) that promotes the conservation of mature, healthy trees in the design of crew dcvclupmcut. ' I'hc Tice Piuscrvatiuu Urdirrance recognizes that the preservation of trees will sometimes conflict with normal land -development considerations. There are rro cuntliuts associated with the project that will prevent implementation of the free Preservation ordinance or other resourceprutcuiiuu urdirramus. Them is no Habitat Cunscr vation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat wase, va[iuu plan wvarurg the prujcut site.
Documentation
Old Alturas Road at Churn Creek Bridge Rehabilitation Project, Natural Environment Study ( Minimal Impacts), ENPLAN, 2015
Riparian Restoration Plan - old Alturas Road Bridge Rchabilitmiurr Prujout at Churn Creek, ENPLAN, 2015 Redding General Plan Natural Resources Element, 2000
City of Redding Municipal Code 18. 45, Tree Management Urdinance City of Redding General Plan EIR, 2000
Mitigation
the following mitigation measures will be implemented to ensure project effects are less than sigrifivaut:
1. In -water construction activities, and all pile -driving activities in Chum Creek, will be limited to the period between luno 1 and October 31, or as may uthciwisu by spe6ticd through jurisdictional permits and approvals issued by the NA*' S, Cllr W, AGUE, and/or RWQCB. if work is proposed outside of the agcrruy- appruvrd work wurduws, the City will obtain approval from those agencies prior to conducting such work, and implement any additional measures that ruay be required. In -water pile driving will only be conducted during daytime hours defined as beginning one- half hour atter sunrise and Winding gine- half hour prior to sunset, or as defured by resource agency permits and approvals.
2. temporary work pads or crossings within the stream will be constructed using clean, washed, ruurrdcd gravel, 1- 4 inches in diameter, and will meet the Caltrans gravel cleanliness specification No_ 85. unless otherwise approved by the Engineer, upon completion of the project, all gravel, including any contaminated gravel, will be removed from the creek bunurn, cxucpt ter the last 6 irahus of Mean, unuuutarninatcd gravel will be left in place to prevent erosion and protect original streambed conditions.
3. All temporary use areas will be restored to preconstruction conditions providing the same or higher density of native woody riparian species, in accordance with the Riparian Restoration Plan - Old Alturas Road Bridge Rehabilitation Project at Churn Creck. Existing woody vegetation will be pruned at ground level prior to work and protected during wrrstruutrun to allow regrowth upon uumplctrurr, of the piujcut.
4. Environmental Sensitive Area ( ESA) fencing will be placed to minimize impacts and prevent unnecessary excursion into protected areas of the creek.
5. A Storm Water Pollution Prevention Plan ( SWPPP) will be prepared for the prujcut whiuh will uutlirrc Best Management Practices ( BMPs) for erosion control and spill prevention. Implementation of BMPs will minimize the potential for adverse impacts to fish, water quality, and the aquatic ecosystem.
U0A11,.— Aad —if AI—, 11 Packet Pg. 192 OV10h., Alu Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
6. Prcuollstruction surveys for western pond turtles will be conducted by a qualified biologist immediately prior to the start of 111 - wale, work each day that ill -water work occurs. Any wesicrn pond turtles, or foothill yellow -legged frogs, eggs masses, or tadpoles that are also found, will be relocated to a sate location upstream or downstream of the work area.
7. Preconstruction surveys for nesting migratory birds will be conducted if vegetation removal or activities affecting swallow riustiug or, the caistu- Ig bridge occurs between March 1 and August 1. Surveys will be uullducicd withal 3 days prior to the pluposcd work. It uestulg birds are found, the nest site shall not be disturbed u11til Oer the young have fledged_ if an active raptor nest is present, no vegetation removal or construction activities will occur within 25U feet of the nest, unless a smaller buffer zone is authorized by the Cum. Appropriate buffer zones may be established for other nesting birds by a biologist approved by the City, The City may utilize a variety of measures to prevent birds from nesting or, the bridge, hicludillg the use of bioacoustic deterrents ( e. g., broadcast calls), ulstallatiort of vxulusium:uy materials ( e. g.,, Teflon or plast; u shGetirrg or other materials that would not entangle birds) in the winter prior to construction, or removal of partially constructed nests following confirmation by a qualified biologist that no eggs or chicks are present ( completed nests must not be removed).
x. All required permits and authoriLatiums shall be obta111cd ItUm state and federal lusumuc agericies pilot tV arty uunstruul urt activities withal Waters of the U. S. All terms and conditions of the required permits and authorizations shall be met.
V. CULTURAL RESOURCES. Would the proposal:
a. Cause a substantial adverse change ill the significance of a histor; ual 1cstiuluc as dctumd u1 CEQA Uuidclmes § 15U64. 57
b. Cause a substantial adverse change in the significance of an archaeological
U A U U
resource pursuant to UhQA Guidelines § 15u64. 5?
c. Directly or indirectly destroy a unique paleontological resource or site or L) El O IN unique geologic fcaturc?
d. Disturb any huiman iumauls, i iuludillg those interred outside of formal Ll 0 U X cemeteries?
Discussion
a, c. No historical resources as detuled un CEQA Sec. 15064. 5 are located within the Arca of Potential Effutas ( APE). In addition, nil unique geologic features, fossil - bearing strata, or paleontological sites are known to exist on the project site.
D, d. Archival research, consultation with the Native American community, and an intensive archaeological survey indicated the presence of cultural resources in the project area. Intensive field studies were conducted to dewmi llc the potential sigriticancc utthuse resources. As a result, it was dctc1111i1ied that there are 11u known archaeological resources as detuled ul CEQA ( iuidelu' les Section 15U64. 5 that will be affected by the project. However, in order to ensure that no presently undocumented and potentially significant archaeological resources that may be located in or adjacent to the project site will be affected, mitigation will be implemented. With implementation of mitigation measures, the project will not have a significant effect on archaeological resources.
Duum" Untatiun
Archaeological Survey report for the proposed Old Alturas road Bridge rehabilitation project at Churn Creek, ENPLAN, 2U15.
Archaeological Evaluation Report ( Phase ll) Proposed tut the Old Alturas Road Bridge Rchab; litatiun Project at Churn Crock, ENPLAN, July 2016
Old Alta.., rc— d and Churn Creek Bridge Rehabilitation Project Initial Study 12 October 2016 Potentially
Significant
a Potentially Unless Less Than
Significant Mitigation Significant No
bn act Incorporated Impact Impact .
V. CULTURAL RESOURCES. Would the proposal:
a. Cause a substantial adverse change ill the significance of a histor; ual 1cstiuluc as dctumd u1 CEQA Uuidclmes § 15U64. 57
b. Cause a substantial adverse change in the significance of an archaeological
U A U U
resource pursuant to UhQA Guidelines § 15u64. 5?
c. Directly or indirectly destroy a unique paleontological resource or site or L) El O IN unique geologic fcaturc?
d. Disturb any huiman iumauls, i iuludillg those interred outside of formal Ll 0 U X cemeteries?
Discussion
a, c. No historical resources as detuled un CEQA Sec. 15064. 5 are located within the Arca of Potential Effutas ( APE). In addition, nil unique geologic features, fossil - bearing strata, or paleontological sites are known to exist on the project site.
D, d. Archival research, consultation with the Native American community, and an intensive archaeological survey indicated the presence of cultural resources in the project area. Intensive field studies were conducted to dewmi llc the potential sigriticancc utthuse resources. As a result, it was dctc1111i1ied that there are 11u known archaeological resources as detuled ul CEQA ( iuidelu' les Section 15U64. 5 that will be affected by the project. However, in order to ensure that no presently undocumented and potentially significant archaeological resources that may be located in or adjacent to the project site will be affected, mitigation will be implemented. With implementation of mitigation measures, the project will not have a significant effect on archaeological resources.
Duum" Untatiun
Archaeological Survey report for the proposed Old Alturas road Bridge rehabilitation project at Churn Creek, ENPLAN, 2U15.
Archaeological Evaluation Report ( Phase ll) Proposed tut the Old Alturas Road Bridge Rchab; litatiun Project at Churn Crock, ENPLAN, July 2016
Old Alta.., rc— d and Churn Creek Bridge Rehabilitation Project Initial Study 12 Packet Pg. 193 October 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Mitigation
1. 1„ viro, n„ ental Sensitive Areas ( ESA) will be established at the project site as delineated in the ESA Actio„ Plan, prepared for and approved by caltrans who has lead authority over cultural resources pursuant to tede, al law. 2_ A qualified archaeologist and Native Ame, iiran will n, onito, eacavatlon and initial ground disturbing construction activities in the portion of the APB within IOU It of known cultural sites, or as defined in the hSA Action Plan. if intact cultu, al deposits are found, all work shall cease in the area, and the archaeologist shall recommend appropriate conservation measures to be implemented prior to re- initiation of the work.
3. In the event archaeological deposits are discovcrud du, i„ g project activities anywhere on the project site, all work in the vicinity of the discove,y shall be stopped immediately and the resident engineer and archaeologist notified. The archaeologist shall , ecommend appropriate conservation measures to be implemented prior to re- initiation of the work.
4. if human remains are discovered during project activities, all wo, k will stop in the vicinity of the find and the Shasta County Coroner' s Office shall be noutied. ' I',eatme„ t of the , emams shall be conducted in accordance with the direction of the Corona ana7u, the Native American Heritage Commission, as appropriate.
Potentially
Significant
Potentially Unless Less Than
Significant Mitigation Significant No
Issues ( and Supporting Information Sources): impact Incorporated' impact Impact vi. GEOLOGY AND SOILS. Would the p, oposal:
a. Expose people or structures to potential substantial advorso oftoots, including the risk ofloss, injury, or death involving:
1) Rupture of know„ east FiquRe fault, as delineated on the most nice„ t Alquist- P, iolo Eff FiquRe vault Loning map issued by the State Ueologist for the area or based on other substantial evidence Ll X of a known fault? Refer to Division of Mines and GeoluTy Spccial Publication 42.
2) Strong seismic ground- shRing? 01
3) Seis, nic- related ground failure, including liquefaction? C9 4) Landslides? . Li IK
b. Kesult in substantial soil erosion or the loss of topsoil? 3 c. Be located on a geologic unit o, soil that is unstable, or that would buco, no unstable as a result of the project, and potentially result in on- N o, off-site landslide, lateral spreading, subsidence, liquefaction, or collapse'!
d. Be located on expansive soil, as detumd i„ 2010 California Building Ll l2Q Code Section 1803. 5. 3, crating substantial risks to life or property! e. Havo soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available Li Ll Ll 773 for the disposal of wastewatert
miscussion
a, c, d. Thee are no Alquist- Priolo earthquake faults designated in the Kedding area of Shasta County. Them are no othe, documented eaUt Fiquake faults in the vicinity that pose a significant risk, and the site is locawd u, an area designated in the Health and Safety Element of the General Plan as having a low Wround- shiiRing potential. The project is not located on or near any documented landslide hazard areas, and the, e is no evidence of ground slippage or subsidence occurring naturally on the site. The type of soils and underlying geology is identified as having no potential for liquefaction. No portion of the site falls within the 1U0 -year floodplain of the Sacramento Kiver_ OldAlturas Road and Churn Creek Bridge Rehabllitutiv V vjcct Mdiaf Dtuay 1. 1 Packet Pg. 194 October eM Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) b. The majority of the project site is located on a flat and busy city street suitoundad by soinu 1Gslduninil development.
The bridge crosses ovvi Chum Cieck wheio thou is the pate„ tial for erosion to occur during construction. The project is subjuct to certain erosion -control requirements mandated by existing City and state regulations. these requirements include:
City of Redding Storm Water Quality Management urO Disz•hurge Cvrttral UrXnaricu. This ordinance requires pir,paration of a Swim Watei Pollution PieventlUil Plan ( SWPPP) for projects such as this. The objectives of the SWPPP are to identify the sources of sediment and other pollutants that affect the quality of storm water discharges, and to describe and ensure the implementation of Best Management Practices ( BMPs) to reduce those sources of sediment and other pollutants in storm water discharges.
State Water Resources Control Board " Construction Generul Perrnir. " This pe, mit suincwhat overlaps the City' s storm watci oidivauw by applying state standards for erosion- coutrol measures during construction of the project. the permit requires that a S WPPP be prepared to address storm water management. e, The project does not involve the use of septic tanks or alternative wastewater disposal.
Documentation
Ciry of Redding Storm Water Quality Management and Discharge control urdinance, KMC Sec. 14. 19 City of Kedding General Plan background Keport, 1998
Soil Survey of Shasta County Area, USDA, Soil Conservation Service and Foicst Service, August 1974 Division of Mines and GeoloTy Special Publication 42, Titlad: Fault-Ruprure Hazard Zones in California; Figure 4U, Utticial Maps of E rffi quKKu Fault 'Zones
State Water Kesources Control Board, General Permit for Storm water -Discharges Associated with Construction and Land Disturbance Activities, 2U12
Mitigation
None nucussaiy.
vu. GREENHOUSE GAS EMISSIONS. Would the piuposal:
a. Generate greenhouse gas emissions, either directly or indirectly, that O O Ll C1 may have a significant impact on the enviioinnent7
b. Conflict with an applicable plan, policy, ui iugulation adopted for the U C9 purpose otiuducing greenhouse gas emissions'!
Discussion
a_ 1n 2uu5, the Governor of California sued Exrcutivr. Uidui S- 3- 05 establishing that it is the State of California' s goal to reduce statewide greenhouse gas ( UHU) emission levels. Subsequently, in 2UU6, the California State Legislature adopted Assembly Bill AB 32, the California Ulobal Warming Solutions Act. in part, AB 32 requires the California Air Resources Board to develop and adopt regulations to achieve a reduction in the state' s GHG emissions to 1990 levels by Year 2020.
Subsequently, California Senate Bill SB 97 was adopted establishing that an individual prnjuct' s effect on UHU cinission levels and global warming must be assessed undc- i CEQA. SB 97 further directed that the State Uftice of Planning and Research ( OPK) develop guidelines for the assessment of a project' s GHG emissions. . hose guidelines for UHG emissions weir, subsequently included as amendments to the CEQA Guidelines. he united States Environmental Protection Agency ( EPA) identifies four primary constituents that are most representative of the UHU rniissions. '. hey are:
Carbon Dioxide ( CO2). Emitted primarily through the burning of fossil fuels. Other sources include the bump tg of solid waste and wood and/ or wood products and cement manufacturing.
Old Ali., a., Road and Churn Creek Bridge Rehabilitation Project Initial Study 14 O,, iab. r 2016 Less Than
Significant No
Issues and Sn orlin Information Sources
vu. GREENHOUSE GAS EMISSIONS. Would the piuposal:
a. Generate greenhouse gas emissions, either directly or indirectly, that O O Ll C1 may have a significant impact on the enviioinnent7
b. Conflict with an applicable plan, policy, ui iugulation adopted for the U C9 purpose otiuducing greenhouse gas emissions'!
Discussion
a_ 1n 2uu5, the Governor of California sued Exrcutivr. Uidui S- 3- 05 establishing that it is the State of California' s goal to reduce statewide greenhouse gas ( UHU) emission levels. Subsequently, in 2UU6, the California State Legislature adopted Assembly Bill AB 32, the California Ulobal Warming Solutions Act. in part, AB 32 requires the California Air Resources Board to develop and adopt regulations to achieve a reduction in the state' s GHG emissions to 1990 levels by Year 2020.
Subsequently, California Senate Bill SB 97 was adopted establishing that an individual prnjuct' s effect on UHU cinission levels and global warming must be assessed undc- i CEQA. SB 97 further directed that the State Uftice of Planning and Research ( OPK) develop guidelines for the assessment of a project' s GHG emissions. . hose guidelines for UHG emissions weir, subsequently included as amendments to the CEQA Guidelines. he united States Environmental Protection Agency ( EPA) identifies four primary constituents that are most representative of the UHU rniissions. '. hey are:
Carbon Dioxide ( CO2). Emitted primarily through the burning of fossil fuels. Other sources include the bump tg of solid waste and wood and/ or wood products and cement manufacturing.
Old Ali., a., Road and Churn Creek Bridge Rehabilitation Project Initial Study 14 Packet Pg. 195 O,, iab. r 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Methane ( CH4)- Emissions occur during the production and transport of fuels, such as coal and natural gas.
Additional emissions are generated by livestock and agricultural land uses, as well as the decomposition of solid waste.
Niiruus Oxide ( N, U). The principal vinitwis iiiulude agricultural and industrial land uses and fossil fuel and waste combustiun.
Fluorinated vases: These can be emitted during some industrial activities. Also, many ofthese gases are substitutes for ozone- depleting substances, such as CFCs, which have been used historically as refrigerants. Collectively, these gases are often referred to as " high global -warming potential" gases.
The primary generators of UHU emissions in the United States are electricity generation and transportation. " Ihe EPA estimates that nearly 85 percent of the nation' s uHU emissions are comprised of carbon dioxide ( CU2). The majority of CO. emissions is generated by petroleum consumption associated with transportation and coal consumption, which is in rum associated with eleutriuity guncrz[ ion. Thom remaining emissions arc predomiliately the result of natural- gas consumption associated with a variety of uses.
According to the California Air Pollution Control Officers Association's ( CAPCOA) publication, CLQA and Climate Change, published in January 2008, there is currently not a single computer model that is capable of estimating all of a piUNLXs
dui
vLa and indi,ed UHU emissions. Huwevei, the Urban Emissions Model ( URBEMIS) is likely the nest consistently used model to estimate a project's direct UHU emissions. UKBEM1S is designed to model emissions associated with development of urban land uses. u" hmiS summarizes criteria air pollutants and CU2 emissions that would occur during construction and operation of new development. URBEMIS was developed and is approved for statewide use by CARB. One of the shortfalls of URBEMIS is that the model does not contain emission factors for GHGs uthu, than CO,, cacupt to, methane ( CH,,) truni nubile suurL;es, which is uunverted to CU,. This may not be a niajur problem since CU2 is the most important U1.1U from land development projects.
With regard to the project, the predominant associated GHG is CO, generated by motor -vehicle travel to and from the site.
The California Air Resources Board ( CARB) has recommended the use of 10, 000 metric tons of carbon diamdu equivalent pvr year ( rrrtCU,.cq/yi) as the " de mirillnus gas emission threshold" in its Climate Change proposed Scoping Plaii, whish was approved by CARB' s Board on January 9, 2009. According to CAPCUA, the IU, 000 mtCU2eq/ yr is equivalent to 55U dwelling units, 400,000 square feet of office use, 120, 000 square feet ofretail, or 70,000 square feet of supermarket use.
The proposed project emissions due tu cunsiructiou arc substantially wi& i the equivaWiri luvcls iequn' W tui wrrstruimmi of thcsc piujccts. Uivcn the scope and nature of the proposed project, emissions from the project are significantly below the thresholds put forth by CAKB, as well as the City of Kedding' s air- quality thresholds. therefore, the project will not contribute significantly to UHU emissions in the air basin_ However, to reduce any potential contribution to negative effects from GHG emissions, as discussed in Section III above, City construction standards and measures will be implemented during the pruject. Many of these rnmasures arc also listed irr the State Attuiney Ciencial' s rewrrnriended measures to reduce UHU emissions.
n. The project does not conflict with any applicable plans, policies, or regulations adopted for the purpose of reducing greenhouse gas emissions. As noted in " a" above, and in Suctiuir in, tM piujc t is irr uvntuirnanuc with the City of RWding' s au quality policies and thresholds, and with state guidelines and regulations.
Documentation
uKBhmS (2007, v 9.2.4) Air Quality Computer Model
Redding General Plan Air Quality Element, 2000
CAPCOA w0sitc, July 2010.
Caliturnia Ottice of the Attorney Ueneral, " The Calitornia Environmental ( duality Act Addressing Ulobat warming Impacts at the Local Agency Level," updated liecember 9, 2UU8.
Mitigation
Norm ncucssary.
utaAlf, a., rcoaa Una Un,,,,, c.:, eex v,;dge f,,XZT[ w..dy 11) Packet Pg. 196 Ociober 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) i
0, C a
Potentially. lin
Significant'
Issues and Su ortin Information Sources . Ine " act .: = lDn ct V111- HAZARDS A1VU HA%AKDUUS MATERIALS. would the
proposal:
a. Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials'! b. Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions i„ volv"' g the A release Fit hazardous,,, aic, ialb i.,iu the envirunn, cnt7 Eunit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one- quarter mile of an existing 3 or proposed school?
d. Be located on a site which is included on a list of hazarduub materials sites compiled pursuant to Ciuveiiu„ cut Code Suction 65962. 5 and, as A
a, usult, would it create a significant hazard to the public or the environment?
e. Foo a p, yjuut located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or h.
f.
g_
Por
project
proj
impair
Expose
people
emergency
eut
a project
use
residing
implementation
result
arca?
people
airport,
respo„
within
in
or
or
a safety
structures
sc
working
would
the
plan,
of
vicinity
hazard
the
ur
or
in
to
cn,
physically
project
the
a
c,
for
of
significant
guncy
project
a
people
private
result
interfere
evacuation
areal
residing
in
risk
airstrip,
a safety
of
with
loss,
plan?
o,
would
an
hazard
wo,
injury
adopted
ki„
the
g
for
or
i,i the
Li Li LI
A
C&
A
death involving wildland foes, including where wildlandb arc Ca O adjauent to urbanized areas u, whc, c , csidunccs arc imc,,,, iacd with w ildlands'?
DINVU53JIUn
a, b, c, u. the nature and scope of the proposed project does not present a significant risk related to hazardous materials or emissions- Although there are petroleum products and chemicals that will be used at the project site, standard Bcst Management Prauti; vs ( BMPs) will be implcmcntrA to p, evcnt spills and to contain and manage spills should they occur.
As requij ud by construction standards, a Stormwater Pollution Prevention Plan ( S wrPP) will be prepared by the contractor to address prevention and management of spills. there are no documented hazardous material sites located on or near the project.
e, f. The projuut is not withal an ai, purt land use plan arca and would not conflict with upuratiuns of an airport or present a safcty hazard to people working or residing in the area. there are no private airstrips in the project vicinity. g. the project does not involve a use or activity that could interfere with e, nergency- response or emergency - evacuation plans for the area. Access to all arcazi within the p, ujcia arca will be available r e, nc, gcucy , cspunsc vuhiulcs at all times. h_ Thr, p, ujea site is located within a mostly developed residential area of xedding. Although that portion of the project near Churn cr is undeveloped, and portions of adjacent residential parcels contain remnant oak woodlands, the relative small size of the area and the wet creek environment will help prevent spread of fine given the type of vugelatiun and presence of water. In addition, standard bpuciticatiunb , cquuc the contractor to prepare a tire prevention plan. The plan add, esscs tine prevuntiun, management, and protocols in case of fire.
Old Alturas Road and Churn Creelc Hr;age Renubititat; un rruject [rsXut 3ru4 10 Packet Pg. 197 October 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Documentation
City of Redding Gene, al Plan Health and Safety Elen, cnt, 2000 City of Ruddiug ( kticial Plan Fiial Euvi oiunciital lmpact Report, Chaptc, 8 ( Health and 5afvty) City of.Redding General Plan. Background Report, Chapter 10, Health and Safety Element, 1998 City of.Redding construction standards
Mitigation
Nu„ v uccussary.
violate any water quality standards or waste - discharge requirements'! Potentially
b. Substantially deplete groundwater supplies or interfere substantially significant
with groundwater recharge such that the, e would be a net deficit in 3 n
k
Unless Less Than
the production rate of preexisting nearby wells would drop to a level t
Significant
which would not support existing land uses or planned uses for which Incorporated Impact 7m '"aet
IX. HYDROLOGY AND WATER QUALITY. Would the proposal:
a. violate any water quality standards or waste - discharge requirements'! C51 b. Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that the, e would be a net deficit in aquitc, vuluu, e u, a lowe, mg ofthe local gruu„ dwate, table level ( c. g., 01 the production rate of preexisting nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)?
c. Substantially alter the existing draiiiage patter„ ofthe site o, area, i.mulud,,, g thruugh the afie, atio„ ofthe cou, se of strep,„ o, Ave,, in a manner which would result in substantial erosion or siltation on- or offsite'! d Substantially alter the existing drainage pattern ofthe site or area, including through the alteration of the course of a stream or rive,, o, substantially i„ c, ease the , ate o, amount of surface runotf in a manner which would result in flooding on- or otf- site'!
e. Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additio„ al sources of polluted , u„ off?
f: Othc, wisc substantially degrade water quality'! l2Q g. Place housing within a i 00 -year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other 3 flood hazard delineation map?
h. Place within a 100 - year flood - hazard area structures which wuuld CH
impede or redirect flood flows'!
1. Expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result ofthe failure of a ca levee or dam?
j Inundation by seiche, tsunami, o, mudflow? 124
Discussion
a, r_ the project will not cause a violation of any waste -discharge requirements or water quality standards, or substantially degrade water quality. Permits will be obtained from the Regional Wate, Quality Control Buard, Dvpartmv„ t of Fish and Wildlife, and the U. S. Army Cups of E„ gi„ ee, s whiuh will allow construction activities in wuTlands, streams, and drainages that exist on the project site. The permits will condition the project to implement measures that will prevent Ula All.,— novas acn.,,, c, eex ts,. age lte0n0JJatio„ Y. ojua J.; t+at Nuay Ii Packet Pg. 198 Oe, ober 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) degradation of water quality. in addition, the city uses construction standards that require all projects to prepare a plan To address water pollution control. the construction standards and specifications for the project will require that a Storm Water Pollution Prevention Plan ( S WPPP) be prepared by the contractor prior to construction. The plan will ensure that wit ei quality standards arc nut substantially affected by the prujuut. It is the City' s standard practice to incorporate resource agency permit conditions and required construutiun standards in the project plans and specifications. b. The project would utilize City water service for domestic uses and fire protection. The proposed project would not impact groundwater supplies.
C. The project will not substantially alter the eAisting drainage pattern of the area, including through the alteration of the course of a stream or river in a manner which would result in substantial erosion or siltation on- or off-site. The bridge will be rehabilitated and widened in place.
d, c. The piujcct will nut substmnially alta the uAistuig diauiagu parkin ut the arca, UnJudnlg through the alleiatiuu of the course of a stream or river. 1t will not increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site. 1t will not create run- off which wold exceed the capacity of existing or planned storm water drainage systems or provide substantial additional sources of polluted water. g, h, 1_ The piujua situ is luuated within the mapped 100 year fluudplaui of Chum Cicck. Hydiaulic studies completed for the project determined that there will be no increase in flood risk as a result of the project. The project will not place or expose new structures in a flood -hazard area or floodplain, nor will it expose people to flood risks.
J. The threat of a tsunami wave is not applivablc to uiland, ue„ tral valley wnununities such as Redding. Seiches could potentially be gunciatcd ii, either Shasta or Whiskuytuwu LiNes during an u ralquKe. Huwcvri, neithci lKe has been identified in the Health and Saffety Element of the General - Flan as having any risk to the City under such circumstances.
There is no documented threat of mud flows affecting the project site.
Documentntiuu
City ofRedding Hoodpiam Evaluation Report for the Uld Alturas Road bridge at Churn Creek, August 2U16 City of Redding Storm -) rain Master -Flan, Montgomery- Watson Engineers 1991 City of Redding Storm water Quality Management and Discharge Control Ordinance, RMC Sec. 14. 19 FEMA Floodplain Maps
Mitigation
None necessary.
X. LAND USE AND PLANNING. Would the proposal:
a. Physically divide an established unniu niry`! u U U A b. Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project ( including, but not limited to, the guneial plan, spec itic plan, luual uuastal program, ui tuning U U U la u. dinanue) adopted for the purpose of avoiding or mitigating an environmental effect"
u. Cuutliut with any applicable habitat conservation plan or natural u Ll C9
community conservation plan!
d. Have social u, cuunumiu impacts resulting in a physical deterioration of the environment ( economic blight)'!
Discussion
a. The project does not have the potential to physically divide an established community.
V( aATMan Kvaa ana Ch..,,, C. eek n, edge KehabdJur v , r, jmf i,,;< iul bi.. dy 13 Oeroher 2016 Potentially
Significant
4 h , I Potentially Unless Less Than
Wes lijlll, i
Significant
Im act
Mitigation Significant No
Incorporated Impact Imact
X. LAND USE AND PLANNING. Would the proposal:
a. Physically divide an established unniu niry`! u U U A b. Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project ( including, but not limited to, the guneial plan, spec itic plan, luual uuastal program, ui tuning U U U la u. dinanue) adopted for the purpose of avoiding or mitigating an environmental effect"
u. Cuutliut with any applicable habitat conservation plan or natural u Ll C9
community conservation plan!
d. Have social u, cuunumiu impacts resulting in a physical deterioration of the environment ( economic blight)'!
Discussion
a. The project does not have the potential to physically divide an established community.
V( aATMan Kvaa ana Ch..,,, C. eek n, edge KehabdJur v , r, jmf i,,;< iul bi.. dy 13 Packet Pg. 199 Oeroher 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) b. The project is compatible with the applicable policies and regulations of the City General Flan and Luuing Uidinanco and is not in conflict with any other Flan adopted by a jurisdictional agency for the purpose of avoiding or mitigating an environmental effect_
c. Thc1c arc iio habitat cviiselvativii on 1lattlial cvlluutlllity couservatiuii plans that die applicable Tv the sire. d_ There are no structures or other infrastructure elements that will be 5I ected by the project that could result in a physical deterioration of the environment.
D VL LL W Cllt$ trUll
City Of Redding General Flan Community Developmout Eleme,it City of Redding General Flan rinal Environmental impact Report City of Redding Natural Resources Element
Miligatiuu
None necessary.
Xl. MINERAL RESOURCES. Would the pivpvsal:
a. Result in the loss of availability of a known mineral resource that [ a would be of value to the iegiou and the , usidcuts of the state? b. ResulT iu the loss uf availability of a locally impurtant mineral resource recovery site delineated on a local general plan, specific Em plan or other land use plan?
Discussion
a, b. Tho p, qj7oct site is not identified in the General Flan as having any known mineral - resource value or as being located within any " Critical Mineral Resource Uverlay" area.
Documentation
City of Reddiulg Natural Resources ElewcuT, 2000
Mitigation
None necessary -
PJ
Uiiess Less Than
I eadn# Mitigation Significant No
Issues ( and Supporting Information Sources). impact Incorporated impact Imuact XII. NOISE_ would the proposal result in:
a. Eaposuto of poisous to Oi gcuciatiou of uoisc levels in oa; oss of standards established in the local general plan or noise ordinance, or F& applicable standards of other agencies?
b_ Exposure of persons to or generation of excessive ground - borne vibration of gotuid- bume 1ioise levels?
u. A substantial permanent mc, ease in ambient noise levels in the project vicinity above levels existing without the project?
Old Almras Road and Churn Creek Bridge Rehabilitation Project Initial Study 19 Oetobe, 2016 Potentially
Kµ Significant
Potentially Unless Less Than
Issues oirtiti . iatii es :
Significant Mitigation , Significant No
and"`Su` + oa < b. impact Incorporated Impact Impact
Xl. MINERAL RESOURCES. Would the pivpvsal:
a. Result in the loss of availability of a known mineral resource that [ a would be of value to the iegiou and the , usidcuts of the state? b. ResulT iu the loss uf availability of a locally impurtant mineral resource recovery site delineated on a local general plan, specific Em plan or other land use plan?
Discussion
a, b. Tho p, qj7oct site is not identified in the General Flan as having any known mineral - resource value or as being located within any " Critical Mineral Resource Uverlay" area.
Documentation
City of Reddiulg Natural Resources ElewcuT, 2000
Mitigation
None necessary -
PJ
Uiiess Less Than
I eadn# Mitigation Significant No
Issues ( and Supporting Information Sources). impact Incorporated impact Imuact XII. NOISE_ would the proposal result in:
a. Eaposuto of poisous to Oi gcuciatiou of uoisc levels in oa; oss of standards established in the local general plan or noise ordinance, or F& applicable standards of other agencies?
b_ Exposure of persons to or generation of excessive ground - borne vibration of g otuid- bume 1ioise levels?
u. A substantial permanent mc, ease in ambient noise levels in the project vicinity above levels existing without the project?
Old Almras Road and Churn Creek Bridge Rehabilitation Project Initial Study 19 Packet Pg. 200 Oetobe, 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Potentially
significant
Potentially Unless Less Than
significant Mitigation Significant No
Issues and Supporting Information Sources): impact Incorporated Impact Impact, d. A substantial temporary or periodic increase in ambient noise levels in U U A U the project viciuiry above levels existing without the project? c. Fol a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?
f. For a project within the vicinity of a private airstrip, would the project expose people resldmrg ur wu,king irr the project area to excessive uuise U U U A levels?
Discussion
a, b, c. There will irot be any pe,irraneiit, long term „ oise or vibration sources or impacts resulting from this project. The project prupuses to rehabilitate an exlstuig bridge to better convey traffic uri Old Alturas Road. d. inuring the construction ofthe project, there will be a temporary increase in noise in the project vicinity above existing ambient noise levels. The most noticeable construction noise will be related to pile driving operations. Pile driving will be necessary for installing H -piles duruig coiistructioii of soldier pile retaii,ing walls o„ each side of the eastern bridge app, vachcs, and fur talse work support structures. The pile diving is expected to taRRe 8 to IU days spread uut over the construction season, with periodic pile driving throughout the day. Pile driving activities will be restricted to between the hours of 1: UU a.m. and 1: 00 p.m., Monday through Saturday. Other noise impacts will occur from operation of standard construction equipment such as excavators, dump trucks, loaders, delivery trucks, and other heavy equipment Back-up safety warning devices will be distinguishable truui other ambient backguund noises. Any pute, itial uuise iurpaUs due to City Public Woks Department projects are exempted by the City' s Noise Ordinance. Noise related impacts are expected to be less than significant and no mitigation measures are proposed. e, f. The proposed project will „ ut result iii any airport related impacts to pcuplc residuig or wurkuig u, the prujcct arca.
There are rru piivatc airstrips iii the vicinity ut-the project site.
Documentation
City of Redding General Plan Noise Element, 2000
City of Redding General Plan Transportation Elejj, eiit, 2000 City of Redding Zoiiiiig Ordiiiance Sectiuu 18. 4U. 1 UU Mitigation
None necessary.
r
tr Potentially
significant
Less Than
Supporting Information Sources:
aig4 fic f lion Significant No
Issues ( and Impact Incorporated' impact Impact;
Xlll. PUP U LA WN AND HU U SING. Would the proposal:
a. induce substantial population growth in an area, either directly ( tor example, by proposing new homes and businesses) or indirectly (for ca example, through extension of roads or other infrastructure)? b. Displace substantial numbers of existing housing, necessitating the c. Displace substantial
of replacement
numbers
housing
of people,
elsewhere?
necessitating the construction
U
u
U
u
U
u
A
A
or replacement housing elsewhere?
OldAlt., a., tc d and Churn Creek Bridge Rehabdirarion Project Initial Study 20 Packet Pg. 201 Octooer 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) llis ussiuu
a, b, u_ 1$ c prujcct will ichabiliLaic aid widcu an existing b, idge vii old Alruras Road. Thum arc uu„ c„ tly two hues of traffic on the bridge. The new bridge will also have two travel lanes and thus will not result in any increase in capacity.
No new development is proposed that is dependent on or will result from this project. the project would not induce u,iplanned population growth and does not displace substantial numbers of people or substantial numbers of existing housing.
Documentation
city of xedding cieneral Plan Housing Element, 2000
Mitigation
No„ c „ cucniniary.
r Potentially
v
Significant
Unless Less Than
Significant No
Issues and' Su ortin InformationSources. 3 in.t_ Impact Impact XIV. PUBLIC: SERVICE' S.
a. Would the project result i„ substantial adverse physical uipactb abNvciatcd with the p, ovisiou of new u, physically altered guvernmeital facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response tii,cb ur other pertuuuancc objcctivcs fur ar, y of the public nic, viucb:
1) P ire protection' s p p p C1
2) Police protection? U U U C1
3) Schools? p p p C1
4) Parks? G u u 19
5) other public facilities'! p p p ad
Discussion
a ( 1), ( 2), ( 3), ( 4), ( 5). The proposed project will not cause substantial adverse physical impacts associated with government facilities, or negatively affect fire/ police protection, schools, parks, or public facilities. The project will rehabilitate and widen a small bridge which will improve the City' s ability to maintain acceptable service ratios and maintain performance objectives.
Dumumentatlon
city of xedding Ueneral Plan Public racilities Element, 2000 Mitigation
No„ e „ ecessa, y.
Dia Aaw, m ttoua —7 ch..,,, C, eek a - d r neh., b; ht. t;v,, r, jest 1,.&.. 1 Study 21 Packet Pg. 202 October 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Potentially
Significant
Potentially Unless Less Than
Significant Mitigation Significant No
Issues (and Supporting Information Sources): Impact' Incorporated Impact Impact XV. RECREATION. Would the proposal:
a. would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial 01 physical deterio, atiu„ of the facility would ucuur ur be auuvleratcd'? b. Does the piujct; i u, uludc rcurcatluual faculties u, require the construction or expansion of recreational facilities which might have ad an adverse physical effect on the environment',
Discussion
a, b. The prupuscd prujcci would not result In airy puicuilal lmpaLas to recreational facilities, such as parks, or require expansion or construction of new facilities.
Documentation
City of Redding General Plan Natural Resources, Recreatiuu, and Public Facilities Elements, 2000 Mitigatiuu
None necessary.
AM
1' RANSPOKI' A' 1' IUN/ CIRUULA' 1' IU. N. would the proposal:
Potentially
a_ Significant
Ll Ll lm
Potentially Unless Less Than
capacity ratio on roads, or congestion at intersections)? Significant Mitigation, Significant No
Issues and Supporting Information Sources' Impact Incorporated hnpact Impact XVl. 1' RANSPOKI' A' 1' IUN/ CIRUULA' 1' IU. N. would the proposal:
a. rause an iiiia case 1„ trdffiu which is substantial in relation to the existing trattit; load and capacity of the street system ( Le., result in a Ll Ll lm substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)? b. Exceed, either individually or cumulatively, a level of service standard established by the uuu„ ty uu„ gestio„ management agency for lm designated roads or higliways7
c. Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety C9 risks?
d. Substantially iuciease hazards due to a design feature ( e. g., sharp uu, ves o, dangerous intersections) or incompatible uses ( e. g., farm CH equipment) Y
e. Result in inadequate emergency access? C9
f Result in inadequate parking capacity? l
g. Conflict with adopted policies, plans, yr p, ugrams supporting alteiiiative transportation ( e. g., bus turnouts, bicycle racks)'l Discussion
a, b, c, d, e, f, g. The proposed project will not cause an increase in trRTiic which is substantial in relation to the existing traffic load and %;apavity of the street system. The project rehabilitates an existing bridge. Temporary impacts to traffic flow will occur but the impacts are considered to be less than significant. minor traffic delays are unavoidable during cu„ structiu„ i„ roadways, however, avoidance of peak traffic periods will minimize delays to the exte„ t feasible. Eiiivigei, cy access will be 01d Alturas Road and Chum Creek Badge RehaoiGtuSun r. ject initial Shay ii Packet Pg. 203 October 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) provided at all times. the project will not have any permanent effects on traffic flow or patterns. the project will not disrupt local traffic levels of service or result in a change in air-traffic patterns Road geometry, emergency access, and parking uapauity will rrui be atteutud by the p, ujeut. The prujcut will slot conflict with adopted policies, plans, or programs supporting alternative transportation.
Documentation
City of Rodding General Plan Transportatiou Element, 2000 Mitigation
None necessary.
Potentially
Significant
Potentially Unless Less Than
Significant Mitigation Significant No
Issues ( and Supporting Information Sources): impact incorporated impact impact XVIL UTILITIES AND SERVICE SYSTEMS. Would the plupusal:
a. E.&ceed wastewater treatment requirements of the applicable Regioual Water ( Quality Control BoardY
b_ xequire or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction ofwhWh could caubc siguiticant cnviiomucnial effects?
u. Requuc u, , esu$ in the cunstructiu„ vt „ cw siu, rrr wate, drainage facilities or expansion of existing facilities, the construction of which A could cause significant environmental effects'!
d. Have sufficient water supplies available to serve the project from existing errtitlelllents and resources, ur are new or expanded CI crrihivinvias uccdedY
e. xesult in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve G l24 the project' s projected demand in addition to the provider' s existing 10111r111ZmG11Z5?
L Be ser vcd by a landfill with sufficient permitted uapauity to CR accommodate the project' s solid waste disposal needs'! g. Comply with federal, state, and local statutes and regulations related to solid waste? lm
Discussion
a, b, d, e. The project proposes to rehabilitate a small bridge urr old Alturas Ruud. ihcrc will be nu utte%;ib u„ ware, u, wastewater treatment systems or facilities. There are sufficient water supplies to serve construction of the project. c. The project proposes to install a new section of storm drain pipe to divert drainage from the east end of the project, which will iurpruvc cttiulcnCy of the stoma drain byAcrrl. Thu sysrrn will not be expanded and installation of the new Slu, rrr dial,, pipe will „ uI uausc slgultluani cuvuurur, cutal cftccts. t, g. the proposed project will rehabilitate an existing bridge. Most of the bridge will be left in place. Some construction debris will be generated by the project, much of which will be disposed of in the local City -operated landfill. There is sufficient permitted capacity i11 the landfill to accommodate the project_ However, standard construction specifications cquiie revyuling of some materials, suuh as stccl, tul,urCtc, and uthc, , rra[ c, ials, iu , cduue landfill wade. ' l,hruugh construction specifications, the City will ensure the project contractor complies with federal, state, and local statutes and regulations pertinent to recycling and disposal of solid waste.
Old Alturas Ruad and Churn Cr66ti 6riffgu RGnubititutiur# Yruject initial Study 23 Packet Pg. 204 October 2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Duuumeutxtiuu
City of Kedding General Plan Publiv EdL;1hues Ele, nrnis, 2000 water and Sewer Atlas, city of xeciding Engineering Division Mitigation
None iiecessary.
Potentially'
Significant
Potentially Unless Less Than
Significant Mitigation Significant No
Impact Incorporated Impact __ Impact
XVIII. MAN1uATORY Fi NluINGS OF SiGN!<r jlC" u.L.
a. Does the project have the potential to degrade the quality of the cnvirunment, substmiRdly reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop beluw sclfsustaining levels, threaten to eliminate a plan[ or animal U C 0 uummunity, reduce the number ur IGstri,; t the Iailgc of a rare ur endangered plant or animal or eliminate important examples of the maj or periods of California history or prehistory? b. Does the prujcct have irnpacts that are individually Iimited, but cumulatively considerable? (" Cumulatively considerable" meds that the incrcmcritaI effects ut a prujcct are cunsidcrable when U U ER L]
viewed in connection with the effects of past projects, the effects of uthcr current projects, and the effects of probable future proj ects)'!
c. Does the project have environmental eftccts which will cause substantial adverse effects on human beings, either directly ur U U U 12 indirectly?
Discussion
a. The project does nut have the putentlal to degrade the quality of the environment, subsiatnlally Ieduce the habitat uf a fish or wildlife species, cause fish or wildlife populatluns to drop bcluw self sustaining levels, eliminate a dmal communities, or reduce the number or restrict the range of a sensitive plant or animal pupuIatiun. As discussed in Scctiun V, the prujcct may have the putuntial to affect impurtant examples of the major periods of California history or prehistory; however, mitigation measures will be implemented which will reduce any putentlal effects to iJ level consldered less thi l sIgnitIum—it. b. As discussed in Section III, the project could contribute to region -wide cumulative air quality impacts.
Huwcvcr, thcsc irnpacts arc considered Iess than sigrElhudalt, and uildcr pulicy of the Gencral Plan, applicatiun of standard measures will eliminate the potential for air quality impacts from this project. c. As discussed herein, the project does not have characteristics which could cause substantial adverse effects on human beings, either directly or indirectly_
Documentation
See all suctIuns abuvc.
Mitigation
See Mitigation measures 1 through 4 in Section V.
vldmr., Hv. au„ aChu,.. C. cekv,; dsercehNhl; rwr: o.. r,ojeer6,; r: wlSr. dy _, a Packet Pg. 205 Oerober2016 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) 1/
ti
Shasta County, California t
1 ,
r - aro.
M,
Uri
l 1
r.
ds
RIMS
FUIVL rigure i 0 2, 000
Project Vicinity and Location Packet Pg. 206 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) e
q ..
a
f.. ' 6, • '
CL
S
1 Ya
T
W
Packet Pg. 207 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
MITIGATION MONITORING PROGRAM
OLD ALTURAS ROAD AND CHURN CREEK
BRIDGE REHABILITATION PROJECT
MITIGATION MONITORING PROGRAM CONTENTS
This document is the Mitigation Monitoring Program ( MMP) for the Old Alturas Road and Churn Creek Bridge Rehabilitation Project. The MMP includes a brief discussion of the legal basis for, and the purpose of, the program, discussion, and direction regarding complaints about noncompliance, a key to understanding the monitoring matrix, and the monitoring matrix itself.
LEGAL BASIS OF AND PURPOSE FOR THE MITIGATION MONITORING PROGRAM California Public Resources Code Section 21081. 6 requires public agencies to adopt mitigation monitoring or reporting programs whenever certifying an environmental impact report (EIR) or a mitigated negative declaration ( MND). This requirement facilitates implementation of all mitigation measures adopted through the California Environmental Quality Act (CEQA) process.
The MMP contained herein is intended to satisfy the requirements of CEQA as they relate to the Initial Study/Mitigated Negative Declaration prepared for the project. It is intended to be used by City of Redding ( City) staff, participating agencies, project contractors, and mitigation monitoring personnel during implementation ofthe project.
Mitigation is defined by CEQA Guidelines Section 15370 as a measure that does any of the following:
Avoids impacts altogether by not taking a certain action or parts of an action.
Minimizes impacts by limiting the degree or magnitude ofthe action and its implementation.
Rectifies impacts by repairing, rehabilitating or restoring the impacted environment.
Reduces or eliminates impacts over time by preservation and maintenance operations during the life of the project.
Compensates for impacts by replacing or providing substitute resources or environments.
The intent of the MMP is to ensure the effective implementation and enforcement of adopted mitigation measures and permit conditions. The MMP will provide for monitoring of construction activities as necessary, on-site identification and resolution of environmental problems, and proper reporting to City staff.
Mitigation Monitoring Program
Odd Alturas Road and Churn Creek Bridge Rehabilitation Project October, 2016 Packet Pg. 208 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
MITIGATION MONITORING PROGRAM
MITIGATION MONITORING TABLE
The Mitigation Monitoring Table identifies the mitigation measures proposed for the project. These mitigation measures are reproduced from the Initial Study and conditions of approval for the project.
The tables have the following columns:
Mitigation Measure: Lists the mitigation measures identified within the Initial Study for a specific impact, along with the number for each measure as enumerated in the Initial Study.
Timing: Identifies at what point in time, review process, or phase the mitigation measure will be completed.
Agency/ Department Consultation: References the City department or any other public agency with which coordination is required to satisfy the identified mitigation measure.
Verification: Spaces to be initialed and dated by the individual designated to verify adherence to a specific mitigation measure.
NONCOMPLIANCE COMPLAINTS
Any person or agency may file a complaint asserting noncompliance with the mitigation measures associated with the project. The complaint shall be directed to the City in written form, providing specific information on the asserted violation. The City shall conduct an investigation and determine the validity of the complaint. If noncompliance with a mitigation measure has occurred, the City shall take appropriate action to remedy any violation. The complainant shall receive written confirmation indicating the results of the investigation or the final action corresponding to the particular noncompliance issue.
Mitigation Monitoring Program
Odd Alturas Road and Churn Creek Bridge Rehabilitation Project October, 2016 Packet Pg. 209 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk)
MITIGATION MONITORING TABLE
FOR THE SAN FRANCISCO ST SEWER REHABILITATION PROJECT
MITIGATION MONITORING PROGRAM
Mitigation Measure Timing/ Implementation Enforcement/ Monitoring Verification
Date and
Initials)
Biological Resources
B- 1. In -water construction activities, and all pile- Construction Construction Management driving activities in Churn Creek, will be limited to
the period between June 1 and October 31, or as
may otherwise be specified through jurisdictional
permits and approvals issuedbytheNMFS, CDFW,
ACOE, and/ or RWQCB. If work is proposed
outside of the agency -approved work windows, the
City will obtain approval from those agencies prior
to conducting such work, and implement any
additional measures that may be required. In -water
pile driving will only be conducted during daytime
hours defined as beginning one- half hour after
sunrise and ending one- half hour prior to sunset, or
as defined by resource agency permits and
approvals.
B- 2. Temporary work pads or crossings within the Construction Construction Management stream will be constructed using clean, washed,
rounded gravel, 1- 4 inches in diameter, and will
meet the Caltrans gravel cleanliness specification
No. 85. Unless otherwise approved by the
Engineer, upon completion ofthe project, all gravel,
including any contaminated gravel, will be removed
from the creek bottom, except for the last 6 inches
of clean, uncontaminated gravel will be left in place
Mitigation Monitoring Program
Old Alturas Road and Churn Creek Bridge Rehabilitation Project / October 2016 Packet Pg. 210 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Mitigation Measure Timing/ Implementation Enforcement/ Monitoring Verification
Date and
Initials)
to prevent erosion and protect original streambed Construction Construction Management conditions.
B- 3. All temporary use areas will be restored to Construction Construction Management preconstruction conditions providing the same or
higher density of native woody riparian species, in
accordance with the Riparian Restoration Plan -
Old Alturas Road Bridge Rehabilitation Project at
Churn Creek. Existing woody vegetation will be
pruned at ground level prior to work and protected
during construction to allow regrowth upon
completion of the project.
B-4. Environmental Sensitive Area (ESA) fencing Construction Construction Management will be placed to minimize impacts and prevent
unnecessary excursion into protected areas of the
creek.
B- 5. A Storm Water Pollution Prevention Plan Construction Construction Management SWPPP) will be prepared for the project which
will outline Best Management Practices ( BMPs) for
erosion control and spill prevention.
Implementation of BMPs will minimize the
potential for adverse impacts to fish, water quality,
and the aquatic ecosystem.
B-6. Preconstruction surveys for western pond Construction Construction Management turtles will be conducted by a qualified biologist
immediately prior to the start ofin -water work each
day that in -water work occurs. Any western pond
turtles, or foothill yellow -legged frogs, eggs
Mitigation Monitoring Program
Old Alturas Road and Churn Creek Bridge Rehabilitation Project 2 October 2016 Packet Pg. 211 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Mitigation Measure Timing/ Implementation Enforcement/ Monitoring Verification
Date and
Initials)
masses, or tadpoles that are also found, will be
relocated to a safe location upstream or downstream
of the work area.
B-7. Preconstruction surveys for nesting migratory Construction Construction Management birds will be conducted if vegetation removal or
activities affecting swallow nesting on the existing
bridge occurs between March 1 and August 1. A
qualified biologist approved by the Engineer will
determine if nests are present on the bridge and if
work activities are affecting nesting. Surveys will
be conducted within 3 days prior to the proposed
work. If nesting birds are found, the nest site shall
not be disturbed until after the young have fledged.
If an active raptor nest is present, no vegetation
removal or construction activities will occur within
250 feet of the nest, unless a smaller buffer zone is
authorized by the CDFW. Appropriate buffer zones
may be established for other nesting birds by a
biologist approved by the City. The City may
utilize a variety of measures to prevent birds from
nesting on the bridge, including the use of
bioacoustic deterrents ( e. g., broadcast calls),
installation of exclusionary materials ( e. g., Teflon
or plastic sheeting or other materials that would not
entangle birds) in the winter prior to construction,
or removal ofpartially constructed nests following
confirmation by a qualified biologist that no eggs or
chicks are present ( completed nests must not be
removed).
Mitigation Monitoring Program
Old Alturas Road and Churn Creek Bridge Rehabilitation Project 3 October 2016 Packet Pg. 212 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Mitigation Measure Timing/ Implementation Enforcement/ Monitoring Verification
Date and
Initials)
B- 8. All required permits and authorizations shall Construction Construction Management be obtained from state and federal resource agencies
prior to any construction activities within Waters of
the U.S. All terms and conditions of the required
permits and authorizations shall be met.
C- 1. Environmental Sensitive Areas ( ESA) will be Construction Construction Management established at the project site as delineated in the
ESA Action Plan, prepared for and approved by
Caltrans who has lead authority over cultural
resources pursuant to federal law.
C- 2. A qualified archaeologist and Native Construction Construction Management American will monitor excavation and initial
ground disturbing construction activities in the
portion of the APE within 100 ft of known cultural
sites, or as defined in the ESA Action Plan. If
intact cultural deposits are found, all work shall
cease in the area, and the archaeologist shall
recommend appropriate conservation measures to
be implemented prior to re- initiation of the work.
C- 3. In the event archaeological deposits are Construction Construction Management discovered during project activities anywhere on the
project site, all work in the vicinity ofthe discovery
shall be stopped immediately and the resident
engineer and archaeologist notified. The
archaeologist shall recommend appropriate
conservation measures to be implemented prior to
re-initiation of the work.
Mitigation Monitoring Program
Old Alturas Road and Churn Creek Bridge Rehabilitation Project 4 October 2016 Packet Pg. 213 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Mitigation Measure Timing/ Implementation Enforcement/ Monitoring Verification
Date and
Initials)
C- 4. If human remains are discovered during Construction Construction Management project activities, all work will stop in the vicinity
of the find and the Shasta County Coroner' s Office
shall be notified. Treatment of the remains shall be
conducted in accordance with the direction of the
Coroner and/ or the Native American Heritage
Commission as al2prol2riate.
Mitigation Monitoring Program
Old Alturas Road and Churn Creek Bridge Rehabilitation Project 5 October 2016 Packet Pg. 214 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Attachment
D
Comments and Response to Comments
Packet Pg. 215 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) From: Oldham, Jon
To: " DARRELL BRUNELLI"
Cc: Vandiver, Corri; Bob Morrison
Subject: RE: Old Alturas Road and Churn Creek Bridge Project Date: Tuesday, November 8, 2016 11: 31: 20 AM
Hi Darrell... thanks for responding with your questions. I addressed each of them in red below.
Please don' t hesitate to let me know if you have any further questions or need clarifications on anything. We will try to answer all your questions as best we can. Once we are done with the env process in the next couple of months, then the ROW process will begin. Someone will contact you during that time to discuss the specific ROW/ easement needs of the project.
Jon
From: DARRELL BRUNELLI[ mailto: darrelllaree@sbcglobal. net] Sent: Monday, November 7, 2016 6: 30 PM
To: Oldham, Jon
Subject: Old Alturas Road and Churn Creek Bridge Project Thanks Jon for the link to the Mitigated Negative Declaration report. After reviewing it I have several questions.
How will the following effect our property?
catch basins along the south side of the roadway. In addition driveways will be modified. Given that the bridge will be widened from 28 ft wide to 67 feet wide, the roadway also has to be widened. It will take approx. 1000 feet to narrow the roadway down from the new width to the existing road width at the east end of the project. New sidewalks will be placed which will extend from the bridge to just short of your driveway. The drainage ditch along the side of the road will have to be regraded to drain the roadway. It will run right along your property line to the creek. Assuming that the new road width affects your driveway, either horizontally or vertically, we will reconstruct or repave your driveway up to the ROW line.
Page2 -- The project will require additional right- of- way to accommodate the new bridge and sewer line.
Temporary construction easements would also be required for construction access and staging. We do not expect to need any permanent right- of- way from you at this point in the design. We may need temporary construction easement from you in order to access the creek, but it would likely be near or within the sewer easement we have along the western edge of your property. The fence along the street does not appear to be on the ROW line so it is affected by the project, it will be removed and replaced on the ROW line.
Figure 2-- Area of Potential Effects-- The area circled within the red line includes a large portion of our property. The APE line is just a study line for purposes of the cultural surveys that were conducted. It doesn' t mean your property within the lines will be affected.
Thanks Jon, Regards
Darrell Brunelli
Packet Pg. 216 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) State of California — Natural Resources AgencV EDMUND G. BROWN JR. Governor DEPARTMENT OFFISH AND WILDLIFE CHARLTON H. BONHAM, Director..
Northern Region
601 Locust Street
Redding, CA 96001
www. wildlife. ca. gov
November 18, 2016
Jonathan Oldham
Public Works Division
City of Redding
777 Cypress Avenue
Redding, CA 96001
Subject: Old Alturas Road at Churn Creek Bridge Rehabilitation Project Initial Study/ Mitigated Negative Declaration, City of Redding State Clearinghouse Number 2016102048
Dear Mr. Oldham:
The California Department of Fish and Wildlife ( CDFW) has reviewed the Initial Study/ Mitigated Negative Declaration ( MND) and Mitigation Monitoring Program for the above -referenced project ( Project), City of Redding ( City), pursuant to the California Environmental Quality Act CEQA) and CEQA Guidelines.'
Thank you for the opportunity to provide comments and recommendations regarding those activities involved in the Project that may affect California fish and wildlife. Likewise, we appreciate the opportunity to provide comments regarding those aspects of the Project that CDFW, by law, may be required to carry out or approve through the exercise of its own regulatory authority under the Fish and Game Code.
CDFW ROLE
CDFW is California' s Trustee Agency for fish and wildlife resources, and holds those resources in trust by statute for all the people of the State ( Fish & G. Code, §§ 711. 7, subd. ( a) & 1802; Pub. Resources Code, § 21070; CEQA Guidelines § 15386, subd. ( a)). CDFW, in its trustee capacity, has jurisdiction over the conservation, protection, and management of fish, wildlife, native plants, and habitat necessary for biologically sustainable populations of those species Id., § 1802). Similarly for purposes of CEQA, CDFW is charged by law to provide, as available, biological expertise during public agency environmental review efforts, focusing specifically on projects and related activities that have the potential to adversely affect fish and wildlife resources.
CDFW is also submitting comments as a Responsible Agency under CEQA ( Pub. Resources Code, § 21069; CEQA Guidelines, § 15381). CDFW expects it may need to exercise regulatory authority as provided by the Fish and Game Code. As proposed, the Project will be subject to CDFW' s lake and streambed alteration regulatory authority ( Fish & G. Code, § 1600 et seq.).
CEQA is codified in the California Public Resources Code in section 21000 et seq. The CEQA Guidelines are found in Title 14 of the California Code of Regulations, commencing with section 15000.
Conserving Cafifornia' s Wifdffe Since 1870
Packet Pg. 217 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Jonathan Oldham
City of Redding
November 18, 2016
Likewise, to the extent implementation of the Project as proposed may result in " take" as defined by State law of any species protected under the California Endangered Species Act Fish & G. Code, § 2050 et seq.), related authorization as provided by the Fish and Game Code will be required.
PROJECT DESCRIPTION
The City's Department of Public Works is proposing to rehabilitate and widen the existing four - span 143 -foot -long by 28 -foot -wide reinforced concrete bridge over Churn Creek on Old Alturas Road. The purpose of the Project is to widen the bridge deck, pier walls, and abutments, and widen the roadway on both approaches to the bridge. To begin the rehabilitation, temporary access roads through the riparian area and across the channel, as well as a temporary work pad in the channel, will be necessary for equipment and vehicle access. To widen Old Alturas Road, the existing abutments will be extended to 67 feet and the existing 1 - foot wide pier walls will be extended to 66 feet and ten 50400t -long 30 -inch diameter cast -in drill -holed piles will be installed to provide support for the pier extensions. Rock will be added to the channel to fill scour holes around the pier walls, and rock slope protection will be placed around the abutments and up and downstream of the new pier walls. Pile driving in the channel may be required for the placement of the falsework piles and for the installation of sheet piles around the pier walls and abutments for dewatering purposes and as temporary retaining walls. Work outside of Churn Creek includes grading and widening roadwork up to 1000 feet approaching the crossing on either side of the stream to match the new bridge deck and adding new storm drains and catchment basins to adequately drain the improved roadway. Traffic will be maintained across the existing bridge during construction, but temporary construction easements will be required for construction access and staging.
PROJECT COMMENTS AND RECOMMENDATIONS
Mitigation Measures B- 1 and B- 2
Central Valley steelhead ( Oncorhynchus mykiss) and Central Valley fall -run and late fall -run Chinook Salmon ( O. tshawytscha) may be present during times of adequate flow and cool water temperature, but thermal barriers and low flow would preclude juveniles from being present during the typical instream work period of July 1- October 15. To adequately protect all salmonids, CDFW suggests modifying Mitigation Measure B- 1 to state:
The work window for any instream or percussive work will be limited to July 1 - October 15, or periods when the stream channel is not flowing disconnected pools), or when the average maximum water temperature is in excess of 25°C to avoid impacts to salmonids. if the average maximum water temperature has not exceeded 25° C by the requested instream work window, the City shall obtain approval from both National Marine Fisheries Service and CDFW. "
Temporary construction -related instream activities such as access roads, gravel work pads, and diversion pipe in the stream channel may affect habitat for fish and aquatic wildlife unless imported material is clean, washed spawning gravel and the affected reach is restored to pre -Project gradient and contours at the completion of the Project and prior to the return of high Packet Pg. 218 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Jonathan Oldham
City of Redding
November 18, 2016
flows. Remaining gravel from work pads may be used to fill existing scour holes, as long as the overall stream gradient has not changed.
Mitiaation Measure B- 3
Mitigation Measure B- 3 mentions the Riparian Restoration Plan—Old Alturas Road Bridge Rehabilitation Project at Churn Creek to mitigate for temporary impacts due to the access roads and staging; however, there is no mention of permanent riparian impacts from widening the roadway and bridge by 39 feet. Elsewhere in the MND, there is discussion of permanently impacting 0. 07 acres of riparian scrub vegetation within the environmental study limits and 0. 03 acres of riparian scrub habitat temporarily impacted by the access road and work pads. The MND as well as the Riparian Restoration Plan need to include discussion of the habitat being permanently removed by the Project, as well as temporary impacts, including type and number of mature trees being removed. Additionally, the measure states, " areas will be restored to preconstruction conditions providing the same or higher density of native woody riparian species", but there is no discussion of what these species are or what the preconstruction condition is. To fully mitigate to less than significant levels and ensure no net loss in wetlands and riparian habitat due to temporary and permanent impacts, CDFW recommends a replacement ratio of 3: 1 for all permanent impacts, and the City may choose to mitigate temporary impacts at a lesser ratio, but not less than 1: 1.
The MND does not identify whether or not the onsite replanting will be monitored and maintained and does not provide success criteria for the riparian mitigation. CDFW recommends that any mitigation plantings be monitored and maintained for a period of five years following initial planting. Plants should be properly irrigated, protected from herbivores and vandalism, and kept free of invasive species during that time period. At the end of five years, plants should achieve 80 percent survival as the success criteria.
Finally, so CDFW can adequately analyze the utility of this mitigation measure, it would be useful to include the Riparian Restoration Plan as part of the document as an appendix during public review.
Mitiaation Measure B- 6
The measure states that to avoid impacts to foothill yellow -legged frogs ( Rana boylii) and western pond turtles (Actinemys marmorata), adults, tadpoles, and egg masses would be relocated if found during pre -construction surveys at the start of in -water work each day. CDFW does not recommend the relocation of amphibian egg masses, however, it is very unlikely that there will still be egg masses present if in -channel work does not occur prior to July 1.
Preconstruction surveys shall still be conducted as long as water is present, however if surveys do detect amphibian egg masses, instream work shall be delayed until the egg masses have developed into tadpoles and the tadpoles can safely be relocated to similar habitat nearby.
Mitigation Measure B- 7
CDFW recommends the removal of vegetation or other activities affecting bird nesting habitat occur outside the nesting season, generally February 1 through August 31, and not March 1 through August 1 as stated in the MND. If any special status bird species are found during preconstruction surveys during the nesting season, avoidance or mitigation measures for Packet Pg. 219 Attachment: Previous Staff Report 2016 (4.11(b)--Approve the Fifth Amendment to Contract (C-5900) Old Alturas Rd over Churn Crk) Jonathan Oldham
City of Redding
November 18, 2016