Packet Pg. 619 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation D2 SI T SPECIAL PROVISIONS
TRAFFIC CONTROL:

PRIOR APPROVAL: Work that witl interrupt the normal flow of public traffic is not authorized without prior approval. Permittee shall submit lane closure information in conformance with the" ADVANCE NOTIFICATION FOR LANE OR SHOULDER CLOSURES" section in this encroact ment permit and receive approval from State' s Representative prior to any lane closure.

TRAFFIC CONTROL SYSTEMS: When personnel or vehicles or work encroach within the highway traveled way, or work is performed within 6 feet of the edge of traveled way ( ETW, white edge stripe), a lane closure control shall be performed during allowed closure timeframes in compliance with the attached Std Plan Tll entitled " Tra c Control System for Lane Closure on Multilane Conventional Highways. Additional advance flaggers or signs may be required as determined by the State' s Representative due to sight distance concerns or interchanges and road connections within the lane closure. Lane closures shall be limited to 1. 0 mile in length. Portable Changeable Message Signs shall be used in each direction. Should State' s representative observe any deviation from these plans, all work will be suspended until satisfactory steps have been taken to ensure compliance.

TRAFFIC C NTROL RESTRICTIONS: Any construction activities that require lane closures shall be night work ( Monday through Thursday, 8 pm to 7 am). Traffic control measures shall not be placed during inclement weather or when the roadway is icy or frozen.

SHOULDER CLOSURES: Whenever vehicles or equipment are parked on the shoulder within 3- feet of the highway traveled way( ETW, white edge stripe), or work is performed within 20 feet of the ETW, the shoulder area shall be closed with fluorescent traffic cones or portable delineators placed on a taper in advance of the parked vehicles or equipment and along the edge of traveled way at 25- foot intervals to a point not less than 25 feet past the last vehicle or piece of equipment.

A minimum of 9 cones or partable delineators shall be used for the taper. A W20- 1 ( ROAD WORK AHEAD) or W2lSb( RIGHT/ LEFT SHOULDER CLOSED AHEAD) or C24( CA)( SHOLJLDER WORK AHEAD) sign shall be mouuted on a crashworthy telescoping flag tree with flags. The flag tree shall be placed where directed by the Engineer, and the sign shall be a minimum size of 48" X 48". Should State' s Representative observe any deviation from these plans, all work will be suspended until satisfactory steps have been taken to ensure compliance.

LANES OPEN TO PUBLIC: A minimum of one paved traffic lane, in each direction of travel, not less than 12 feet wide and adjacent paved shoulder shall be open for use by public traffia When construction operations are not actively in progress, all lanes shall be open to public traffic. 5IDEWALK CLOSURE: Whenever work is being performed above or adjacent to the sidewalk, the sidewalk shall be closed to pedestrians, as shown on the attached Standard Plan T30. For sidewalk closures, Permittee shall install, maintain, and remove, when no longer needed, all pedestrian detours. Sidewalk closures and detour plans must be approved by State' s Representative prior to beginning work. The sidewalk shall remain open to pedestrians when work is not actively in progress.

ADVANCE NOTIFICATION FOR LANE OR SHOULDER CLOSURE5: By noon Monday, Permittee shall submit a schedule of planned lane and shoulder closures for the following week period, defined as Saturday through the following Friday. If Monday is a designated holiday, the schedule shall be delivered on Tuesday. Permittee shall submit a completed copy of the attached Lane Closure Schedules form by email to d2epermit@dot. ca. gov. If an ernail is unavailable, the schedule may be called in by voice telephone at( 530) 225- 3400.

NOTIFICATION FOR LANE OR SHOULDER CLOSURES: Permittee shall notify the Caltrans District 2 Encroachment Permit office by telephone at( 530) 225- 3400 at the time a lane or shoulder closure is instalted, and again when the closure has ended. Permittee shall provide the following information; Permittee' s name, encroachment permit number, location( county, route, and post mile limits), direction of closure( e. g., southbound, eastbound, full road), and the time when installing or ending the closure. For weekends and a8er hours, Permittee shall leave a message at the above telephone number, with the details as indicated. Permittee shail also notify Encroachment Permits office if a scheduled closure is cancelled. Permittee MUST call to renort status each dav a closure has been requested.

Page 2 of 5 ends

APPROVED
Packet Pg. 620 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation D2 SN SPECIAL PROVISIONS
CON5TRUCTION ACTIVITIES:

HOT MIX ASPHALT: Hot Mix Asphalt ( HMA) shall be produced at an established commercial mixing plant. The aggregate and asphalt binder shall be heated and mixed thoroughly. Asphalt materials and mix design shall be submitted via the CEM-3101. HMA shall be Type A as specified in Section 39," Asphalt Concrete," of the Standard Specifications.

Asphalt binder shall be Grade PG64- 28M unless otherwise directed by State' s Representative. The maximum size aggregate shall be %2- inch. Prior to placing HMA, a paint binder of asphaltic emulsion or paving asphalt shall be applied uniformly to contact surfaces of cold pavement joints and to other surfaces designated by State' s Representative. HMA shall be spread and compacted by methods that will produce an asphalt concrete surfacing true to grade and cross section, of uniform smoothness and texture, compacted firmly and free from depressions, humps or irregularities. Road connection paving shall match the elevation of the highway pavement at the saw- cut line.

AGGREGATE BASE: Aggregate base shall be Class 2 and shall conform to the provisions in Section 26, " Aggregate Bases," of the Standard Specifications. Spreading and compacting shall be performed by methods that will produce a uniform surface that is unyielding and firmly compacted, and free from pockets of coarse or fine material. Aggregate base shall be compacted to a relative compaction of not less than 95 percent. The existing gravel roadbed of the dwelling road connection may be adequate, as determined by State' s Representative, for aggregate base.

INSPECTION: Permittee shall request and receive an inspection of by State' s Representative prior to placing HMA paving material.

CURB, GUTTER.& SIDEWALK:

CURB, GUTTER& SIDEWALK: Existing concrete sidewalk shall be cut at existing contractionjoints. Sidewalks shall be constructed as shown on the project plans, and as directed by State' s Representative. Sidewalk shall conform to the provisions in Section 73, " Concrete Curb and Sidewalks," of the Standard Specifications and to these permit provisions.

The sidewalk shall slope in accordance with the requirements of the Americans with Disabilities Act of 1990 ( ADA).

Permittee shall request and receive an inspection by State' s Representative of the concrete forms and subgrade prior to placing curb, gutter, and sidewalk concrete.

Curb, gutter, sidewalk, and curb ramps( wheelchair ramps) shall be constructed as shown on the project plans, the attached Standard Plans A87A, A88A, and as directed by State' s Representative. Curb, gutter, and sidewalk shall conform to the provisions in Section 73, " Concrete Curb and Sidewalks," of the Standard Specifications and to these permit provisions.

The sidewalk shall slope in accordance with the requirements of the Americans with Disabilities Act of 199Q ( ADA).

Permittee shall request and receive an inspection by 5tate' s Representative of the concrete forms and subgrade prior to placing curb, gutter, and sidewalk concrete.

SAW CUT: Where curb and gutter is to be placed, existing paving shall be saw cut to a neat line, and as directed by the State' s Representative. Wark shall include removing the asphalt concrete, and re-paving to the gutter lip after placement ofthe new curb and gutter. Existing concrete sidewalk shall be cut at the score line or existing contraction or expansion joint.

PORTLAND CEMENT CONCRETE: Portland cement concrete shall be produced at an established Caltrans- certified commercial mixing plant and conform to Section 90- 2 Minor Concrete of the Standard Specificatons. Exposed surfaces of Portland cement concrete shall be cured by pigmented curing compounds or as directed by State' s Representative.

CERTIFICATION: All ADA facilities constructed under this permit shall be certified compliant ( TR- 0405) by a registered engineer or architect prior to issuance of the permit and after the facilities have been constructed.

TRENCHING AND EXCAVATIONS:

LOCATION OF FACILITY: The location of proposed facilities shall be staked, and the locations approved by State' s Representative prior to any excavation. State' s Representative can direct an alternate placement location of a facility as

Page 3 of 5 ends

APPROVED
Packet Pg. 621 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation D2 SN SPECIAL PROVISIONS
long as there are no other problems with moving the facility from the planned placement, for such issues as environmental concerns, constructability, or canflicting facilities. Such changes shall be shown on the as- built plans.

OPEN EXCAVATIONS: When work is not actively in progress, trenches, and excavations within 20 feet of the edge of traveled way( ETW, white edge stripe) or 10 feet from the edge of pavement( EP), whichever is greater, shall be closed backfilled and compacted) in compliance with the attached Open Trench Signing and Mar-king EPI drawing. All disturbed areas and facilities shall be restored to original condition and to the satisfaction of State' s Representative.

TRENCHING REQUIREMENTS: Trenches or excavations shall be excavated and backfilled in accordance with plans, specifications, the attached Standard Typical Trenching Detail EP2, and the direction of the State' s Representative. All disturbed areas and facilities shall be restored to original condition and to the satisfaction of the State' s Representative.

TRENCHING ACROSS ROAD CONNECTIONS& PAVED AREAS: Trenching or excavating across or within the paved portion of State' s highway will be permitted. Excavation, placement and backfill across road connections shall be done with as little interference with traffic as possible. Adequate provisions must be made for the protection of all vehicles and pedestrian traffic. Existing pavement shall be saw cut to a neat line prior to excavation.

BACKFILLING PAVED AREAS: Trenches or excavations in the paved roadway shall be backfilled with a non- shrink slurry backfill consisting of two sack concrete per the Standard Specifications. HMA should match existing depth of paving, or as directed by the State' s Representative.

BACKFILLING UNPAVED AREAS: Trenches or excavations in the unpaved highway shoulder shall be backfilled with Class 2 Aggregate Base, or material approved by State' s Representative. Native material shall not be used to backfill trenches unless specifically approved by the State' s Representative. Backfill material shall be placed in 8- inch lifts at optimum moisture and be compacted to 95% relative compaction. Trenches outside the unpaved highway shoulder area shall use the same backfill method and be compacted to 90% relative compaction.

PROTECTION OF EXISTING FACILITIES: E. cisting curb, gutter and sidewalk, drainage pipe, structures and signs shall be protected from damage. All regulatory signs that are disturbed by Permittee' s operation shall be temporarily reset at a location directed by State' s Representative. All signs shall be placed back in their original location as soon as the work is complete. The cutting of any drainage pipe shall not be permitted.

DEPTII OF COVER: Minimum depth of cover shall be 42 inches for high and low risk lines, and 36 inches for no risk lines below finished grade, or 18 inches below the grading plane ( whichever is greater), or as directed by State' s Representative.

HIGHWAY SURFACE: Permittee shall not track mud and debris onto the paved portion of the highway. Any soil or debris inadvertently tracked onto the highway surface shall be removed with a self-contained sweeper and disposed of outside the State right of way. Use of water to clean the surface of the roadway will not be allowed.

INSPECTION: Permittee shall request and receive an inspection of the excavation and trenching work by State' s Representative prior to placing slurry, HMA, sidewalk concrete, or any backfill materials.

EXISTING HIGHWAY SIGNS AND PAVEMENT DELINEATION:

MAINTENANCE OF REGULATORY SIGNS: Existing regulatory signs shall remain in service at all times. Existing regulatory signs that conflict with the work shall be temporarily relocated and maintained at locations directed by State' s Representative. When all work is completed, the regulatory signs shall be permanently reset as directed by State' s Representative. Signs and/ or posts that are damaged or unusable, as determined by State' s Representative, shall be replaced at Permittee' s expense.

TEMPORARY PAVEMENT DELINEATION: Centerline, lane line, channelizing line, limit line, bike lane, and crosswalk pavement delineation shall be provided at all times for traveled ways open to public traffic. Whenever the work causes obliteration of pavement delineation, temporary or permanent pavement delineation shall be in place prior to opening the traveled way to public traffic. Only temporary removable traffic tape and/ or raised pavement markers shall be used for temporary pavement delineation on the final layer of new surfacing or existing pavement to remain in place and shall be removed when no longer required, as determined by State' s Representative, for the direction of public traffic.

Page 4 of 5 ends

APPROVED
Packet Pg. 622 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation D2 SN SPECIAL PROVISIONS
All affected permanent traffic striping and marking will be replaced in kind to the satisfaction and timing of the State' s Representative.

TRAFFIC 5TRIPE5 AND PAVEMENT MARKINGS: New traffic stripes and pavement markings shall be thermoplastic and conform to Section 84, " Markings", of the Standard Specifications. Application of the thermoplastic traffic stripes and pavement markings shall be in accordance with the Standard Plans, Section 84 of the Standard Specifications, and the approved plans.

MARKERS AND DELINEATORS: Markers and delineators shall conform to the provisions in Section 82," Signs and Markers," of the Standard Specifications. Markers and delineators shall be installed as shown on the plans unless otherwise directed by State' s Representative.

SIGNAL, LIGHTING AND ELECTRICAL SYSTEMS:

FIELD REVIEW: Prior to beginning of any electrical work, the Electrical Inspector, a representative of the Electrical contractor, the State' s Representative and the Office of Traffic Operations shall meet at the project site to review plans for accuracy and completeness.

NOTIFY STATE' S REPRE5ENTATIVE: At least five working days before starting any work necessitating signal control modification, notify Caltrans electrical engineer Ben Paull, telephone 530- 949- 2497.

TRAFFIC SIGNAL: Traffic signals, intersection safety lighting and signal interconnection work shall conform to tlie approved plans and any additional approved plan changes, revisions or modifications, the Standazd Plans, the attached Special Provisions, and the provisions contained in this permit.

INSPECTION: Permittee' s contractor shall contact the State' s Representative to verify electrical inspections and provide daily diaries on a weekly basis.

UTILITIES:

NOTIFICATION OF CALTRANS: Caltrans is not part of USA Underground Locate; therefore, prior to beginning any work, Caltrans Electrical Supervisor shall be notified at 530-225- 3469 to locate electrical connections, and Census Loop Liaison at 530- 225- 3313, or District Traffic Manager at 530- 225- 3245 to locate all underground count stations.

Page 5 ends

APPROVED
Packet Pg. 623 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation V
Caltrans[? 02; Encr achm nfi Permi s Qffiice
p R! 5 EP1' E
z
Permit#; 0223- R 5- 0345
z
C3atei 29, 2 2 Q^
hlote: t nly plans s amped with this apprc vat v'i
JT T shall be valid far permit canstructican wark.
zo x
0 TRINITY ST BIl EWAY PRC JE T
o
JCiB NO$ 687 CONTR, 4CTOR SNALC POSSES5 A CLASS " A" IGENSE AT 7HE TIME F THE BID QPENING: BID SCMEDULE Nt) JCXXX ox pw
ER* b
Zu
d w
u
P Li
P p
b
S {
S
4Q
w
m_ W
s \, ` w-" SHEET WDEX a
v
E
r " l 1. -
1-
SHEET NO. SHHET TITLE DRAYVING NO. o
µ t TITLE A- 1
s'
t` ? ; ``
f`'
f
s
t^-. 2 DATA A. 2
W A,
a "' "' A \.. 4-) ` r ' t , 3 NiJTES AND RUANTITIES A- an atuw s t ' 1 '"' .,--
c4'' r-` 4 CONTR L AF-` j--"`
C"` \
i'` . 1---;. 5 KEY MAP A.
5 C ./ Y ` { l ..

Y. ` ..- \ 41Ki M
LL.
1 m._--'—_..._._.....' .. 1^" ^
1 ` r'`, r- " r^ a m TYPIGALSECTIONS A6
R. `" Q
a 1 i` l
jt-:---' :?" __
s !` l - 1i • C,_ TTHftu 12 PAVEMENT dELINEAT10N AND SIGNS A-T THRU A12 t \~„ - µx`
a,. ,
ff . _ PRQJECT
W
Q
r ,, _ , 1 1ti ` .- ., 13 PAVEMENT DELINEA" A- fION GlUANTITIES 13 t i' ---' Clt- ^- `"' p14 PAVEMENT DELINEATION DETAILS
A- 74 QG
T'
Q tL :
t--
mr -
u Q 4} 4 t, t "- ; s.0
wy . 0 t.' 75 THRU 16 CONSTRUCTION RETAILS A-15 THRU A16 QF w \":. \ S '>?. . 1 E ;:: t TRaFFtc s'cW,aL No res a-a REQD/ NG c=_ l 1
A- 19 F— y 18 THRU 19 TRAFFIC SIGNAL PLAIJ A-1$"fHRU f
w F ~• 1
20 J
t` t „` s 30 TRAFFIG SIGNAL SCHEDULES AND[ 3ETAllS Ar t „ i ' i '` E f 21 CON TRUCTION SIGNS A21
Lrl t: , ..:
an REDDING w` 22 THRU 26 REU PLANS A-22 TWRU A1` ; . ." 26 r,
ca` K"' MUNICIPAL a,
1 t-, = 1
l,\,>- 1.. t C I
t'\,"' '
jlt
CPI} a 'a..-; ..---°.,.... A F' RT a.
i r,J CT L.

TI v NO SGA
E
Rn
a
m
CL
a
VICINITY MAP NQ SCAI.

E
y
W
N 00 1--PIANS

REVIEWED
8Y:

H m R. M.
0 m
o
zF
m 0 RG
APPROVEd BYr SUPPqRT gURU
y. A.

ORIGINAL SCALE: R. E.u. op s Ci11'
ENGfNEER
NE
DATE REDUCED .
2023 PLANS SHEET 1

APPROVED
Packet Pg. 624 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation ABBREVIATIQNS Galtrans
C 02, Encr achm
n Perrnitst ffice =
N
LEGEND P EP1'
z AB AGGREGATE ASE FR9 FQRCE MAIN SC SAW CUT EXISTING W AC
P t' Y' ttlt#1: 0223- P1 IV- U345
z
ASPHALT CONCRETE SD STdRM DRAIN
FMJA
D l4e, 29f G23 w°` FlANGE MEGHANICAL JOINT TELEPHONE PQLE ACP ASBESTOS GEMENT PIPE SDMH STORM DRPJN MANHOLE ADAPTER Q AT&T AMERCAN TELEPHflNE & FOG FACE OF CURB SF SQUARE FOOT JOINT POLE lo; C? rsly pl ns stamped with thi5 pproVal v

TELEGRAPH
FT FOOT. FEEf SHT SHEEf POwER POLE
S1 IIkV lid fqr pei"mit COI15tPUCtIc3f1 WO.

ASTM AMERICAN St3CIETY QF
t
TES7ING AND MATERIAIS PG FOOTING SIM SIMILAf?
Gy PaLE

BSW BACK OF SIDEWALK
G GAS

S SANITARY SEWER, SIOPE

GUY WIRE
o0
8G BEGINNING OF CURVE
GAUGE

L STEEL
GALV GAI: VAMZEp ELECTRIC MANHQLE
o
BCR BEGIN CUR6 REfURN SO SQUARE
w
GM GAS MEfER
Q

Q SANITARY SEWER MANHOLE

BDRY BOUNDARY STA STATION
8F 80TTOM OF
GR GUY POLE s STORM DRAIN MANWbI_
E
o FQQTING

GR GRADE
T 5' 1ANDARD
8LK 8L( IGK STRUCT STRUCTURAL OR STRUCTURE C

GV GATE VALYE
TELEPHONE MANHdLE W
Q
BM @ENCH MARK SVC: SERVICE 4? HC t CALFRANS RIPE DRAIN HANDICAP BOC BACK OF CURB SW SIdEWALK Y
W
HDPE HIGH QENSffY POLYETHYLENE
O STORM DRAfN CATCN BASIN
C CUT SY SpUARE YARD
QQX HMA HOT MIX ASPHA T 7
Ra GAN CABLE TELEVISION T TELEPHdNE
HORIZ HdR120NTAt Ii__
r

C&G CURB AND GUTTER
p. OJ HEIGHT
TB
T

P OF BANK STREET NAME SIGN
C8 CATCH BASIN T8C TOP BACK QF GURB TRAFFIC SIGN
aW
ID WSIDE DIAMEfER
CCC} CONTRACT CHANGE CIRQER
E
T8R 70 BE REMOVEQ
c -- t'3 STREEf L1GHT

TC TOP OF GURB
1 pADMt1UNT TRANSFORMER CCS GEMEM COATED STEEL IRRIG IRRIGATIQN

CQ CHECK DAM JT JOIM TFC TOP FAGE OF GURB

FIRE HYDRANT
CF GURB FAGE, CUBIC FOOT JP JOIM POLE 1' TRIM LINE
W
CLF' CHAIN L1NK FENCE LEFT TW TOP OF WAI_
L
G'< l GKJ VALVE
C CEPITERL NE LAT LATERAL TYP IYPIGAL 5- g_ SEWER I. ATERAL WITH CLFAN OU" f
w \
C , pq L8 POUND UG UNDERGROUND 1-- RpDHdLE n
W

GMAC COLD MILL ASPHA

T LIP LIP OF GUTTER UNK UNKNOWN
PROPERTY CORNER / SURUEY MARKER ( DO NOT DISTURB} a
a
CQNGREfE LF LINERR FOOT USA UNpERGROUND SERVIGE
CMP CORRUGA7EO MEfA RIPE Ll. LIMIT LINE ALERT GENTERUNE MONUMENT 1- CMU CONCREfE MASONRX UNIT UTIL UTILITY
Z
CO

LP LOW POINT CQNTROL POINT

W CLEANOUT( SEWER) S LUMP SUM
VB VpLVE BOX
T JOINT U7ILITY' TRENGH
COL C01.UMN MA?f MAXIMUM
VGP V17RIFIED GIAY PIPE
CQNC CONCRETE VERT VERTIGAL dFI EXISTIN6 OVERHEAD UTI tTiES

MH MANHOLE
y. VALLEY GUTfER

E ELEGTRIG LINE
Q
a
CQNT CONTfNUOUS MID MIDPOINT
Q
W
COMR CONTRAC7QR VIF VERIFY IN FIELD MIN MINIMUM

G GAS LINE
CQNST CONSTRUCTIQN MISG MISCEt.LANEOUS
ATER

T TELEPHONE UNE
W
C00t2D Cd0(2DINATE WM WATER MEfER
MJ MECHANICAI_ JCIINT U'}
CORCS CIIY OF REDDING MpN MONl1MENT
NATER VALVE 80X NIATER LINE
CONSTRUGTION STANDARD5 WVB WATER VACVE SD STQRM ORIUN UNE d

CP GI NTRQL POINT
O

MKR MARKER
CS C4MP05T SOCK
H
NEW
5 SANITARY SEWER LINE
CSP CORRUGATED STEEL PIRE NG NATURAL GRADE G. A,T.Y: LINE v

CY CUBIC YARD NTS NOT TO SCALE

EASEMENT IJNE
j
DI DRAINAGE WLEf OC ON CENTER
yy--- - - ---- - RIGHT- OF- WAY LINE
QfA OIAMEfER OD OUTSIDE DIAMETER
DIP DUCTILE IRON PIPE OG QRIGINAL GROUND PROPERN' LINE ODW, DRAWING 4H OVERHEACS a ^.._ i-r--t;..__ GUARD ftAIL x DWY QRNEWAY PC PRfJPER' fY CORNER X- 74-? f-) F-- 7 - FENCE EE} EXISTING PCC FORTLAND GEMENT CONCRETE CUf/ FILL uNE W =

E ELECTROC PE POLYETHYLENE
y
G- a
H
PIP PROTEGT IN PLAGE E54
a ENVIRONMENTHL SENSI7IVE ARFA
m
EG END OF CURVE PL PROPER7Y LINE

X X--- - TEMPQRARY ESO, FENCE
a
E6 EDGE QF GUTTER PP PdWER POLE
EL fIEVATION
pG PdIN7 QF REVERSE CURVE EROSION CONTROL ( PERM)
Q Ef EDGE OF PAVEMENT pSl POUNDS PER SQUARE INCH
M. MWk

EVG END VERTIGAL GURVE PVG POLYVINYL CHLORIQE
Qcp TEMP GRAVE GHECK QAM
W

EXC EXGAVATION
p FOINT OF VERTICAL
TEMP GOMPOST SOCK m EXT EXTERIOR INTERSECTION F F1LL t17Y QUANTITY i FES FLAI2ED END SEGTIQN REODING AREA BUS C ' '
r TREE ( DECIpUOUSj
r
FF FINSNED F1:00R
AUTHQRIlY
rym
R RADfUS i,,

FG' FINISHED GRAQE TREE ( CQNIFER)
n
F`F{ F' IRE HYDRANT
RC RELATNE CZ3MPAGTION ri
RjW RIGHT OF WAY
FliA FIRE HYDRANT ASSEMBLY

REINF REINFORCED OR BUSH / SHRUB
i
i'";
Fl FLOW LINE REINFdRCEMENT
y
0m

FLG FLANGE RSP ROGK SLOPE PRQTECTION
NOTE: PtL
THIS1A STANDARD IEGEND SHEEf. THEREFORE
SOME SYMBOLS & A88REVIATIONS MAY BE 5HOWN oa ciw. sca E:

ON TWIS SHEEf BUT MAY NdT BE UTILIZED ON REDUCED NONE
THE ORAWINGS qF THIS PROJECT. PLANS
UNE 2023
SHEEf 2 OF 28

APPROVED
Packet Pg. 625 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation

GENE L NOTES W

1. AGL CONSTRUCTION SHA I GONFORM TQ THE CURRENT CITY OF RE6DING CQNSTRUCTION v STANDARDS ( CORCS), THE STANDARD SPECIFIGATIONS F6R PUBLIC WORKS CALTRANS STANDARD RLANS ZO 2 St.1MMARY OF QUANTITIES CQNSTRUCTION, DA7ED 2021 { GREENBdOK), ANQ THE CONTRACT PECfFICATIQNS AS z THEY PERTAIN TO THE W4RK DEPICTED HEREIN. CORCS AS APPLJES TO THIS PROJECT T M PAGE DETAIL ITEM QUANTITY UNIT SHALL BE 7HE CURRENT VERSION AS POSTED ON THE CITY OF REDDING WE@SITE, PAVEMENT MARKERS AND TRAFFIC UNES, TYPIGAI dEfAILS ................................ ......... ........... 12 A20q htto•llcitvofteddin orgfde aortments/ nublic works engine ri Cnne4n rf DR standord WATER FOILUTION CONTROL PAVEMENT MARKERS AND 1TtAFFIC LINES. TYPIGAL DETAIL:S . ......... ........, ......... . 13 A2QB y
AT THE TIME 4F 61D OPENING:

PAVEMENT MARKERS ANO TRAFFIC GNES NPICA DEfAiLS . 15 ; 420p IMP EMENT WATER POLLUTION CONTROL LS

2. Al. UTILITIES SH4WN ARE STRI TLY FOR THE CONVENIENCE OF THE CONTR,4C70R. PAVEMENT MARKINGS, ARROWS ......... ......... .,,.,.,,, ,,,,,;;,, .,,,,,,,. ,,,,,,„.. ,,,..,.,,,; g A24A TRAFFIG GONTRQL Q
UTILITY LqCATIONS ARE QN Y APPROXIMATE AND THE CONTRACTOR IS RDVISED TO pAVEMENT MARKINGB, WORDS ............... INVESTIGATE EAGH UTILITY SHOWN AS WELL AS @E AWARE OTHER UTILITIES NOT SHOWN 22 PROJECT FIINDING SIGN MAY EXIST. PAVEMENT MARKINGS. WOROS .. ....... ....:.... .......... . .....:. ........: ......... ......,... 23 A24E SHOUIDER RUMBLE STRIP DEfAILS. GROUND- C4NSTRUCTION AREA 91GNS c", IN INDENTATIONS .....::.. ......... ......................... 2 A4pg 42 EA

3. CACL BEFORE YOU DIG! tHE CONTRACTQR SHALL CONTAGT USA NORTH 61GALERT AT URBS AND pRIVEWAYS 155 A87A ca EAST ' iW0 ( 2) WORKING DAYS NOT INGLUDING THE 6ATE OF NOTIFIGATION PRIOR T0 2 DIGGING NEAR UNDERGROUNQ FACILITIES BELONGING TO PG& E, AT& T, C. A.T.U., A. C. I: D., CURB FtAkiP QEfAILS . .... 1S7 A68A Cp p MI L AG 1700 SY i
OR CI? Y OF REDDWG. CA L USA NORTH 81 L 8 ELECTRIC SYSTEM5 LEGEND .................................... ......... ......... ......... ......... .....,.... 509 ES- 1A q$ PHALT CONGREfE ( MICROSURFACING 3329 FQR CALTRANS ELECTRICA FAGLITIES GALI ( 53q) 225- 3469 ELEC7RIG SYSTEMS CEGEND .... g gy Z,
510 ES- 16 m "
FOR GALTRANS UN ERGRQUND GOUNT STA710NS CAII { 530) 225- 3042 ELECTRIG SYSTEMS LEGEND 511 E5- 1C ASPHALT CpNCREfE 34D TON o Y o

4. PRIQR Tf? ANY EXGAVATIQN, THE GONTRACTOR SHALL POTHO E ALL UTILITIES TO BE ELECTRIC SYSTEMS ( GONTROLLER CABINET FOUNpATION AND PAD DEtAII.} ...:.. ......... ..,:...:.., 519 ES- 3G AGGREGATE BASE 155 GY Ea CROSSEd TO VERIFY THAT NO GRAQE GONFLIC7S EXIBT. ELECTRIC SYSTEM5 ( ELECTROMCS ASSEMBLY CONNECTION DU1GFtAM)( BATTERY BACKUP SY57EM) ..... 527 ES- 3K 4, b
cRass currER
Q

5. AlL TRENCHING AND BACK FILLING SHALL @E IN ACCORDANGE WITH THE CiTY OF EI. ECTRIC SYSTEMS ( SIGNAL HEAD MQUNTING 30 SF
m u
REDDING CQNSTRUCTION STANDARpS OR AS SHOWN IN 7HE CON TRUC710N OETAILS EIECTRIG SYSTEMS PEDESTRIAN SIGNAL HEADS 28 ES_ A CURB AND GUTTER tsp l. F m u,
ELSENIHERE IN THE PL.ANS: TRENCH BACKFILL SHALL, BE MECHANICALLY GQMPACTED. f 29 ES 49
o
THE CONTRAGTOR SHRLL NOT7FY THE GITY QF REDDING ELECTRIC UTI ITY PRI{ 1R TQ ELEGTRIC SYSTEMS ( SIGNAI_ HEADS AND MOUNTINGS) ......... . .......,. ......... ......... ......... 530 ES- 4C GpNCRETE GURB RAMP 71q0 SF 4` EXGAVATING GLOSER TNAN EIGHT FEET TO AN EXISTING UTILI' tY POLE:
ti
ELECTRIC SYSTEMS { SIGtJAI. HEAD MOUNTING) ....... ......... ......... . ...,.... ...:,.,:. ......... 531 ES- 4Q

6. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FQR FURNISHING, ELECTRIC SYSTEMS ( SIGNAL HEADS AND OPTIGi1CAL DETEGTOR MQUNTfNG) .:.................... .....,... 532 fS- 4E REMOVE PA INSTALLING ANQ MAINTAINWG A L WARNING SIGNS AND DEVICES NEGESSARY TO EI.ECTRIC SYSTEMS LQOP DEfE6TOR5 533 ES- 5A ENT MARKING ( THERM PLASTIGj 451 SF
M
SAFEGUARD THE GENERAl. PUBLIC AND THE WdRK, ANO TO PROVIDE FOR THE PROPER REMdVE TRAFFIC STRIPE THERMOPLASTIG 12685 LF Q
AND CONTINUOUS SAFE ROUTING OF VEHIC E AND PEDESTRIAN TRAfFIG pURING THE Et_ECTRfC SYSTEMS ( dETECTORS} ......... .....:... ......... ..,...... .....:..: ......... ......... 534 ES- 5B z
PERFQRMANGE OF THE WORK THIS REQUIREMENT SHALL APP Y CON' fINUQUSLY AND ELECTRIC SYSTEMS ( ACCESSI@tE PEDESTRlAN SIGNAI. AND PUSH BUTfON ASSEMB IES} .. ...,:..., S35 ES- SG PAVEMENT MARkING ( THERMOPlASTIC) 53? gF W
NOT BE LIMI7ED 7Q WQRKING HOURS. THE USE OF FLAGGERS, BARRICAOES AND Z n • i ELECTRICAL SYSTEMS ( SIGNAI ANQ GGHTING STANDARD, T1" PE t AtJD EQUIPMENT IDENTIFICATIbN 545 ES- 78 CONSTRUCTIQN SIGNING SHALL CQMP Y` WITH THE CAUFORNIA MANUAL ON UNf ORM CHARACTER5) PAVEMENT MARKING ( GREEN BIKE) 4689 Sf
7R+IFFIG CON7RdL DEVISES { CA- MUTCO}, W
ELECTRICAL SYSTEMS ( SIGNA AND LIGMTING STAP1QARp, GA'SE 3 SIGNAL MAST ARM LOADING, 1NIND TRAFFIG STRIPE ( 4" THERM4PLASTIC 532 LF FQR ALL TRENCHING EXCAVATIONS 5 FEET OR M4RE IN DEPTH, THE COMRAGTQR ELQCITY= 7 0 MPH ANO SIGNAL MAST ARM LENGTNS 15` TQ 45') e 548 ES- 7E
SHALL OBTAIN A PERMIT FROM THE DNISION OF INDUSTRIAL SAFETY ( 381 HEMSTED TRAFFIC STRIPE ( 6" THERMOPLASTIC) 274i2 LF
DRIVE, REDDING CA., 224- 4743) PRIpR TO BEGINNING ANY EXCAVATIdN. A COPY OF EIECTRICAL SYSTEMS { SIGNAL AND LIGHTING STANDARD DEfAII N4. 7) ......... ......... .......... 55S ES'- 7M TRAFFIG STRIPE ( 6" THERMOPLASTIG) W 629 LF
THIS PERMIT SHAL 8E AVAILABLE AT THE CONSTRUCTION SITE AT AlL TIMES. EIEGTRICAL SYSTEMS ( SIGNAL ANQ UGHTING STANDARd DETAIL N0. 2} ......... ......... .......... 556 ES- 7N ELECTRICA SYSTEMS ( SIGNAL AND IGHTiNG STANDARD DEfAI N4. 3a ..,...... 557 ES- 70 PpVEMIENT MARKERS 553 EA I"

8. THE CONTRACTOR SHALL MAINTAIN AGGESS T0 EXISTING MRIL8QXE5 OR PROVIQE C ALTERNATE TEMPORARY MAILBOXES AFPROVED BY TNE U. S. POS7AL SERVIGE. ELECTRICNI_ SY5TEMS ( SIGNAL AND LIGHTING MISCEWWEOUS ATTACHMEN7} ,.,.. , .,...... . .......... 559 ES- 7R INSTALL SIGN 4 q Z ,
ELECTRICAL SYSTEMS { NON- TRAFFlG PUIt BOX) ... ,......,.

9. CARE SHpL BE TAKEN TO PROTECT EXI571NG PLANTS, SHRU83, REMOVE SIGN TREES, LAWN, EStANDSCAPE AREAS AND IRRIGATION SYSTEMS.
17 EA Q W ANY ITEMS REMOVED OR DAMAGED
ELECTRICAL SYSTEMS ( FOUNDA710N INSTALIATIQNS) ....,.... ......... ......... .......,. .......,.. 571 ES- t t SHALL BE REPLAGED. A l 17EMS WHICH REQUIRE REMOVAL OR ARE DAMAGED BY THE ELECTRICAL SYSTEMS ( SPLIGE INSUTATION METH005 QETAILS) 572 ES- 13A ARKER POST 243 Ep
0 GdNTRACTOR'

APPROVAL OF
S
THE

OPERATIQN
ENGINEER.

SHALL BE REPLACED TO ORIGINAL CONDITION AN0 TQ THE ELECTRICAL SYSTEMS ( KINKING AND BANDWG DEfAit) ......... ......... .............. 5?3 ES- 13@ y Y TRAFFIG SIGNAL MODIFICATIQNS 1 LS

10. E AGT LIMITS OF PAVEMENT REMOVA AND RECONSTRUCTIdN SHALI. BE DETERMIN6Q IN O THE FIELD BY THE ENGINEER. THE ASPHALT CONCREfE AL NG THE EDGES OF THE STREEf LIGHT ( STANDARp ANQ EQ UMINAIRE} TRENCH SHALL 8E SAWCUT AND REMOVED TO A STRAIGHT LINE FRIOR TO FINAL PU BOX ( 2E) PAVING. EXPOSED VERTICA EDGES WWIGH WILL HAVE ASPHAIT C6NCRETE A6AINST y2 U ( 3 THEM SHALL BE TACKED WITH EMU SION PRIOR Td PLACEMENT OF ASPHALT CONCRk? E.

PULLBOX ( 3E} 3 Eq
m
C6NDUIT ( 2" PVG) 1725 lF
CITY QF REDDING GONST UCTION STANf3ARDS a
coNauiT ( 4. ve so F
MQDIFIGATIONS TO 7HE' STANDARLl SPEGIFIGATIONS PAGE 050. 00 CQNpUGTOR (# 6) 1725 F
MATERIALS .....:... ......... .....,... ......... ......... ................. PAGE 1QQ. 00 Ef. TYPICAI: S7REET GR4SS SECTION .................... ......... ................ PAGE 111. QQ z
STANDARD AND SLOITED CRqSS GUTfER PAGE 126. dp Cal rans C?f}2, EnCroaChm nt Pert7llt5 flffiCe N SIdEWALK STANDARD ...... PAGE 137. 00
r
m
GURB AND GUTTER ( 8" ... ......... ......... ........: ...:.......:.::: PaGE t36.40 Permit#. 0223p S 160345
CURB RAMP ' IYPE A :....... ......... .......:: .....:... :.........,....., PAGE 141. 10 f*: 9 202 2 CURB RAMP ' iYPE C' ....... PAGE 141. 30 Q
tV te: t7n( yplar s starriped with this approval
L
NO PARKING' S1GN INSTALLATIQN PAGE i52. 02
5h 11 be valid for errnit canStYUGtiott 5rvork. W STREEf SIGN BASE DEfA1LS ..,..,... ....:..:. ......:.. :................ PAGE 182. 2Q PAVEMENT MARKINGS TRAFF'IC uNES ......... .....„.. ...........,..., PAGE 179: 00 Q PAVEMENT MARKINGS ARROWS :........ ......... ......... .............:.. PAGE 172.00 HIGH
F- W VISIBILIN CROSSWALK ......... ......... PAGE 175.fl0 I tMONUMENT COVER ASSEMBLY AND INSTAI. LATION ......... .. .............. PAGE 184: Q0 LOCA7ING WIRE & WARNING TAPE .... ......... ......... ................. PAGE 402: 00 z
m
DENSfTY REFERENCE GUIDEIBNE ,...,.. ......... ,....,... ..:.............. PAGE fi01. 00i TRENGH BEDDIN PAGE fiq9i00 Z
TRENCH BACKfILL ......... ........: ......... ,......, ..... ,... RAGE 61Q: d0 TRENCH RESURFACING DETAILS ........ ......... ..,...... ..,.............. PAGE 611. 00 JOIM llTILITY 7RENCH DETA LS ....,... ......... .............................:.. PAGE 820:00 A- 3 TRENGH LOCATION ......... ......... ....:................... .......,........ PAGE 624. 2Q aRiciwu. sca:

GRADING DE51GN" STqNDARdS ......... PAGE 700. 00 REDUCED NONE DENSITY REQUIREMENTS IN STREETS . .. .....: PLANS +
T uNE 2023
PAGE 705: 00
SH r 3 oF 2s

APPROVED
Packet Pg. 626 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation WN
CONTF2iJL PQINT TABLE
zz W4y GP No. Northing Easting Pointflevation Qesciipfion r fi01 20971p6: 1Q 6456523: 92 506. 18 CpR WASHER
609 2097148: 82 8456097. 53 491: 33 CQR WASHER
CP 6 \
61Q 2097208: 42 64b5518. 05 500. 28 COR WASHER Zo
z
uy 611 2096960. 43 6454943. 39 509. 37 GOR WASHER
pR' N(', E$
j t
r 612 2096919, 85 6454594. 71 522. 35 COR CAP ON REBAR
i 62Cf 2097625. 84 6454287. 49 528, Y0 COR WASHER
v
S1 fi21 2Q98034. 32 645d155. 23 543: 13 COR WASHER
73 622 2098459. 23 6454046.30 545: 23 COR WASHER
z
624
N
623 2098352: 26 645387; 34 543, 93 COR WASHER
a
Q- CP 6' 624 2098244. 32 6453527. 3d 542. 95 GOR WASHER 8 3a
2 N 625
25 2098156. q0 6A53248. 89 SA8. 72 GOR WASHER
o
Q
z
626 2098134: 1Q 6453006. 34 558, 22 GOR WASHER
Y
w
2,. R,,
P 621
628 2Q97674. 08 64522 3. 72 585. 71 COR WASHER
Ry
y Njp. Note: Gontractor shall not disturb
cantrol R,'` poin#
s o praperty corners during
0 canstruction activities.
ug
CP 628 aay
a
5tJ .*:.
t
cW
OZ
P 628
W
w \ z a''
cj:

SN"(.

R
Q.
ur
a
Z
G
W
A
mJ4
GP 610 L]
V .

CP509
W
C
601 (
f.

B"!
4 . Q
G 61
Q
oo
CP b12
3 C'
4 3 0. W @
Cal rans D02, Encroachrr ent Permits
t ffice \ LL
P R15.

G EPT` E
Permit#. 02 3-
f51Ua
3 5
JO
C ate; J29J2 23 W
Note: Gn! Y
P I ns stam
p ed with ihis
a pprovalY
hall
b valgd for permit construetionc rk. Op H
1 I--
m4
1 Ai
ORIGINAI. SCALE:

REDUCED Nery
PL.ANS'
oarE:, uNE xoaa
SHEET
4 6F 26

APPROVED
Packet Pg. 627 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation Caitr ns
C 02.; Encra achrnent Permits fi ice
N
V GEPl'
E
P rrriit#:
t 223- t- 03
z
L < — _ 23 J^
Notei tJnly p(ans stam,
p 6Tt
r
pa rcav l
shallb eralod far pecrhit constructic
n wr a ,
a
G 3'
rn
p
aaW
t
N
i
Pi21NGE ST
0 Z
ca
a ;
Y i
a
J
Z
o
xz3
Ta
t
J
f
oxa i
a
Ra
VP
m
F
W
T ,
e
q
uV
4` Svgr a
r
P
5 a*
1 c» N- `
p
W
o
a
SNp,
P
1 p
J
4 d
W
W
t
t n=
tl
r
pG
U
J
a
m
v
cn a,
y p
X
V
Z
6" O .
m
a
a
i
Q
aa
mz
ma
1 \
A
w Sc.:

REDUCED r+oNe
PLANS onre: uNE 2osa
SHEET 5 OF 28

APPROVED
Packet Pg. 628 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation cL c G Itrans GO; Encroachment Permits Office i
w
46A P 5 EPT' E
Permit#; 2 3- 5P- 0345
BUFFER L? a e« f29B2423 Q s fVc te: Crnly plans s amped with this approval N ca
16` 20
shall be ualid for permit construction work.
o YC E
IAN
a,a i

VARIES TRACK
48' TQ 53 2
o
0 eu ea EP rJ ca u
9' MIN. 12' 12" MIN. 12'
o
PARKING TRAVEL TRAVE GYGLE 1. 5% 56' o
tANE LANE TRAGK ------ '-- 3'
eu ER o
12` 9' 12° 12' 8'
X °

CQ TI ENTAL STREET
CYCLE PARKING TRAVEL TRAVEL PARKING EER• m
r' 3+ 3o To 3s+ 3a TRAGK LANE LANE a
C}, 2' AC
a

0. 85' AB
Stip"
J3t1' R.

T11' IY 1 1 a.71 R G 1
r i o+ so To 7+ 00
o
W
CQNTINE TAL STREET n -
W
r' 3s+ so To aa+ ao o
N
0 Q c Z
Sq.' p
W
2' MIN.

BUFFER VARIES
41 15 TO 1$. 1" 14' 12' Z Q

PARKING TRAVEL TRAVEC GYCLE
guFFER
L. ANE E p W TRACK 1' 8' 11' 1 1' 11' 8' W Gl

CYGLE PARKING TRAVEL TURN TRAVE PARKING

TRACK E LANE LANE
a
A
t.
m

TRINITY STREET
s+ s ro s2+ a
a' BUTTE STREET
T' 49+ 80 TO 58+ 50 oz" W
tJ? t,y
C.

O p O p m
tdJ
S,
BUFFER
7 a
BUFFER ty
8 12 12 8 12`
W

PARKING TRAVEL TRRVEL PARKING CYCLE
2 11' 11'

LANE I ANE TRACK
CYCLE TL4NE TLANEL
m
TRACK
Ft
F
2' CMAC
0 2 ac
m
m0
A-6
TRINITY STREET Q•

BUTTE STREET
T' zz+ o ra sa+ s
r' sz+oa Ta ss+oa
REDUCED ra: T.s.

PLANS :

JUNE 2023
IEEI' 6 OF 28

APPROVED
Packet Pg. 629 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation F
WN
Ul U
z
W
z 4
Z Q
W^
o
i } € 1099 GENTER ST I 1548 TRIf ITY ST 1536 TRINITY ST ji 22 TRINITY ST 109Q CALIfORNIA ST Z E( 145B TRINITY ST tn
f ? ' g a7A: 70+ 62 I ; I
j ' s O I i SfE CYCLE TRACK GUIDE Ja`
r; r_} BEGIN MIGROSURFACE 4 n
IL UNE bETA1L SHEET 74 3
Y
4 ` C I y
I
t
p[
i J
ry
i ` i '
G .
yj:$ k . t' . L2. C]
7` (_ 4
S , i. g, I I;< ._._.._ ..-- I .... . v.... t-_ ___ ___,._ .,._ __ --- .__..___. ...

E
k; g' Q t ..__.._..
o
t sz W,:..__ _:._:_. v.__.. _ _ .....:. _
t R W ---- c
U! i _.._____ .'_._._, _. :. .._. __.>._____.._ ___ j ,: 3., a:. `:'. e
v: , ._., .._'__ i_...:._ ..._..... ._.___.. ,. _......._...._ . _ . ... .._ l. . ._..,..___ . .._.__ ____"'_ '__ .-..

W
I. e.`. s..., r' l t..
1" E
t7 _ I CI
F„
a
i
s,
t D'
L..
o r
w
r 29
i
4 i,QfJ
Z
c
E 1Q Hvc i
f . TRINITY ST N
N
z
90°tl i! 11+ OD T LINE 12+ OQ 13+ QQ c+ s 94+ 40 T L: INE 95+ Ud L t`c t a Y .
r
vr tt c o 0
I I---- 1— - ER
t
is G7., a
n
G7
r
t. a. .. e r s dt c- » i — _ N
r• - a
s i.
tr. h t. a.,
aw - i. s- - '- - — s. - s- - a- - S8 rt- e
rt.,,... . _.,:.,, _ . ..;... _ _-
N
I r
t.>' ., `..
i' ,
i... t, t f ..;.... , 4.
a.
i c f.. _..__.:._. _..___ :__. __,. ____ w.._ . _...! _._ _ _ __ __ ___.__. p N
4S
i.

E, \;!, f ,<.. s s..::;,, ,. ., w, ,,.. tiv',:' ._ ._ . .__..,._._.._ ._..._:_... ._ t` 3rSPJ3N' e 54 „ ,..,,. F ........ .. . . . . . . r . ..._.__ _.,._... _.... _..._ . . .._ ..... _.. _ _....._.__._... _ ._.. . t] i i;t i " • t .--•. ( rr "..

W
P
t
i't i " a , F ! t
r C1,' FOR CYC(_E TRAGK
r' _ . _.._
I ( t x ! `: !( 1 TREATMEPI7 SEE QETAILS 1
j:. t ' , ..___.,'__._ _ ._ __'_.. ...._.._.._.._ _........._ :._.:_. a..._ ._............,._._ _...._:__.._._.. _ m., s T

4. ( E......— .._......___._.. ___., .."__..._, ..,. . e. yy _ qN 5HEET 14 a
t (
RJyy,.,
n .
e s l f D11- 1
i32C i f i [
i 4 f a i ' I ' II I STREET UGHT ( STD & lED LUMINAIRE i f ` a4 ` i GC w W I y f f
SEE REU Pt.AN- SHEET 23 i : ; s i!+ MICR03URFACING Z n ; r
f
zll 3
z , uMrTs
REM( VE TRAFFlC STRIPE a
5 a
I s AND PAVEMENT MARKfNG 101 GENTER S7 TTSB CAtIFQRI l, 4 ST il o
i
I
z
3 i ! f I ; j 111 7 CALIFORNIA ST
t
I I i P t
I,
c rI i i yw # Z
i
i h. i E G
Z k{
S'" ! , W
i tk.
f i ` j
G
I
i f A1
Z
a
W
F D2
I k
1094 MARKET ST 15 7
11 t lkk
4 '
I 7Q35 MARKET ST 1348 TRINITY ST 1338 TRIh1ITY ST 132 8 TRIt ITY ST I 1318 TRINITIf ST I C f 4 "' e
s 2 k ( ( k
i
t
187 4 TRINITY ST LL ."
MICROSURFACING a j " i
C C { i `
f ` I 1
Q
1JM175
i
k
D11- 1 a
E BD RM Fg
r i r
tlr a § F°
r i Rg l_ 5 Cp o R61 7 GA PARAII. EL PARKING U (,
ti k E, MICROSUR ACING
22 a
BD I `
i'
l `
3$
I uMITS a J

LINES TYP
t '
22 SEE SHEET 14
il
w...__R W----- I Q
1 iw==._ _—--- -._ __ : w_.
m
J_.__.._ l .__..._ :=._ _.,»—_ :._ .-=__ =- =--.___
ca E ---__
ti; i t t -_ _ _ --- - - 1
o
a ,,_ _ ._ __:_:-..

E---__._. __-= -°__ .-_-__._.
w: a _
T i =,,_ - __ _ _ _ `-__`
n___ , t.... '`
o
ua
u°t
H/ 1"— GW s s ti `-
V
Z v
HVG r T rN T( ST
W'
y v s
pp
N T' LINE W n
W 1&
SL__ ' T' LINE 97 9& FW 2 0 0 ( g}
k—,. i
m 0
1/ , o A : N
Z 0. Z
T . 4p Q
fJ at a r i aa
F- 6' a E-•:..- 6 . " "'".""": :' '
f'"..
f
M
j
rL'. . . `- i
j.
v:. ..:.... . ._ i._-_-_ ,. 4:_._
i .,..._-- __._ , .._.. _._ _-__ a._._. ._._.. , '_ _'.__ _._._-.. v.. . ___ ... _ .. a t
n f
r .:, .... W
j
C C.
a .
a CP 62 .,___
r ,....._.- -_.._.._ .._ ..__... _.._._._...__. .__ iss 4 ai_ .._.___.__._.._...____.,.__..._....... _. C_._.... Y f
r k, p,. a. r
t v n _.
r
J
1 -
R vy - --_ _ _,.____ __ __ :_ _.,
e.-- - _
x: _ _ R yy N: ,
i i ( GC
k
7, ` ;,''
i GC BD
f~/i N
w siGN E t " w,' sicN
p _- 1 w
j i RM F4R CYGLE TRACK i
r t = °
D1 R61- 7 CA TREATMENTS SEE OETAllS I ( i
il
y
E MICRO5URFACING w
f
t D/ 1- t
IJMITS rZ' },
15 i ON SHEET 14 C , f i m
g i, i Ct. I Q
t` R61- 5 GA 1 425 TRINITY ST , a
z
STREET UGHT( 57D c L D LUMINAIRE} F t F `" }, z.., ,
R ,. 1 135 MARKET ST altr ns C702, Encroachment Peimits Office 1331 TRINITY ST a SEE REU PLAN- S iEET 23 PB. tUS A1 CEP"TEtPerrnit#: Q 23 P1 t- 3A5 Q-7 d te: Af29/ 2023
owciru Sca.E:

N4te: Only plans stamped with ttiis appravaM REDu ED 5. . shafliaevaiidforpermitconstructicanwork:
yC DATE: JUNE 2023
5HEET 7 OF 26

APPROVED
Packet Pg. 630 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation F- z
1314 TRINITY ST tia
4 1085 PINE ST 12Y6 TRINITY ST
i
N 1095 EAST S? 177a TRINITY ST 11fi0 TRiNITY ST 1156 TRININ ST f C W I, C I- '
ti
o
L_
Z I. I MICROStJRFACINf t '
i
a
i G 1
LIMITS W i ;
SEE CYCt.E IRACK GIJIDE ' i' ( 22 j {' i
i
22 r, I Q
LINE dETAIL SHEET 14 ,
I C k t 4i 4 ,
ra 3
f; r fltk I .,.__. 4£:i.

L_Q 2
RfW_. m._- _ .,,__ _{. gws:,., I, ..._._ RfW;.n'..___... i,! RJW.._. . _.__ P i..:..._ ...._ 4 ._ ,.__...
i
i..!.F ,''; tif=. 5D t` 7
O
CP°. 628 r--——- _
3,
m.' r
0 t,_.„_...
o A Oil h a
i., ,:. ,. i', . _.:.._ ...._ :_... . t7. .._ ..... .... .. ._:...... . . .. .:........ ..__........ .,. E . f` t i.,_ _ C . . t o
C?-
W
w ... c:._
a
o
p
N 6
CW N N
8 a
t
4'/ 1 R r
W 22+ OQ $ T IJNE 23+ 00 T
24+ 00 f} 2S+ OG 28+ 00 ' T' LINE 2T z
8 = Q
Y z" -
I- - I- --`=- I -
J
u r r r r r r o{ c o W .
eM rr!
rrrrr a , f • " m
r T r
v
v
U t' rr rr rrrrrrwwr. a N +
eEa. k
4r;.' .:. W yF;,., .,, r
y B,
Q
g
I N SD. m a
y;,:,; y..
s : , i:'",: t w."':. i y„ ..,,'r,,.; z
r_ .; _.......:..... r:. ...._. - .._.__
r w.._.:::. .. m: . _, a..._,. _ ._.. ,.. - — S:: __ _
p
i ,< „..,... r... v........:,...,c, , d. ._ t . . — , . x,:...,,.. z t - ._ >>-.:: _ ,.._, y - - I , , E,( y 4 i i<," f
t o'+
TS s<,.. y,.:,. rF' o.. ``.,.. r1,.
c;...... r-'
w-....^"' t, 5..
m__ ._ j - _. _ _ °, ___-____ __ ._ ___ . ._. ..._ n
s:
t'
z
n
MJ3
r„.,.r.. , ,. . . r. w ,,.:.. . .... ..:. ti, y t l
1 s r w.. .._., . u.. „_,. w , ..._;., ,.,, k S G,. f
W RfW R u....

E c w...__ _ _
u,.

GC ' E ( i
k
i 1'
FOR CYCLE TRACK GG n t"'/, f
t
GC
TREATMENT 5EE DE7AILS t_ I
rti_ ' fll i
E i v
i
e
i,
r
in, a z
rn u r r_ _ u r i
r»
1 ON 5HEET 14 i' F- N
ca
C PARALLEL PARKING IJNES- TYP i tA r
I ` Gti
E
y"
z ; s
p,' 1
µ SEE SWEET 14 i + ` f. a
4 1
3 s ,
ii} ia t;a
w i n 4 B [' E i
m t a i ,, i1135 PIN ST s G= 1-075 TRINITY ST
f -
Z D3
DETAIL a SEE CYCLE TRAGK qJIDE LJNE
15 SHEET 14
Z
W
Z Q
W W
Gi 1 746 TRIMTY ST E „ E 1097 GII @ERT ST t 100 TRINITY ST 10$ 0 TRINITY ST I I II I
F^' I! I I 4 L :' 1090 CONTINENTAL ST O il! ; i W
lil i ji
I
I
j
O r''( III I IIi
F" } k
j il d fl I
i
t
4 I ' i H I 1 MIGRdSURFACING
i E. E
i[ ¢k
CI G k , I :LIMITS i
i u
t t R, I
i
m j Cft f
VJ___..___ _ _. ....._ .._.. .. _ ___. _________,_,_.
ts. 4 . _. ( f
W_
a< _, - . ..
r t___ _-_ W___ _ . ___ ____.... __ ___ _____ i B I__ _ R t
4 >;, xv>.,, 22 __ r. a. .,,,. m._ ___ _ ._. __. __
p. t
t j
L,} w._.._.._._ ,.__-^,,:. 4 , _, wt
c. _" _"
c
S...,' f_..._.._._._...,.
g .. , .
ei" '=. "-= ..,_.
e.. _— "' " _,:_._ . . .. n TR' N T ST
cv ev W ; h F
u W OQ 2& F T
LINE 29+ 00 3Q+ 00 39+
00 T' LINE
d I— -— - —-- -
3Z+ W 0-- 0- i
F— - f
a -
2 O
y
m I T T T T T.. T T T 1 F T T T T. I T
T
2 .

U.,. : a • a . o o
e i\. Y. . YY
YY.
e 131 A! i. il Bi\
i1
4 Q 4+ ^^+
r. i+ .. B
M. ^+! •
e
a CF 5W -^ STM-- 824 ap M CP 82i 2W -
F- a.;._..__.._._:_.__.. ...
x,_ >_._...._._. __:.:.. _.. ..._ n,:..:,..,,>- ,..__ __. ._:,- ___...::::_. .._-- . -.._. __._-.-- c._.-_.,_ , --_ wQ s 1 1___ 1 a _?...__
w
m. y.,,; tE ,_
z c..___ ."=_.___.----________ _...._ _ '. _ , _-- ....__._ .._______.._..__;.____ = 1 e____.___ W ..._ _
t`.
y:,.___ R
yy .._ _.. ___ ,_ _. ___ __ _. _..__.__ ___
a..._.__ R y
iT__. :_...._ ._ ___ .....,__
tllR m
jW._. oR crc nz
cK _ _ __._:_
m , , TREATMENT SEE DETAItS GG I li E '"' `_ ' j GC
i ON BH ET
14 1 i( 1 j I PARALLEI. PAt KlNG UNE (
TYP) i€ i E SEE SHEET
14 SEE CYCLE TRACK GUIDE UNE DETAIL W t ; i W SHEET 14 i Q j i i i m i C Itrans C12,Encr`oachrneri Permits t7ffice a -107S TRINIlY ST r t„ t 1055 TRINITY ST , y-1025 TRINITY ST o Permi##. z h St345 A8 C te: f2 J2
3 ORIGIWU.

SGFLLEt 0: Qt{ 3 C1S S F11 2L'{ iaVl t t 115 2 7 kI' OV REQufs D 2 shall be vaHd for permi c anstrucei n
work.

PLANS onre: ur, e
soza SHEE[ 8 qF

APPROVED
Packet Pg. 631 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation WN
GZ
059 CONTWENTAL ST z
wJ
U FOR CYCLE 1RACK NEW ASPHALT n
TREATMENTS SEE pETAIIS CONGRETE- SEE
ON SHEET 14 DETAIL 4, SHEET 1& Q z
C9 3
24 2 W_
o
MIGROSURFAGING GC SIGN AND POST SEE CYCLE TRACK GUIdE LINE QETAIL UMITS C.t}NT ENTAL JT SHEET 14 8
Rjy._ . w , _ _._ _.... _ ... w w`
3t_., -
o
m._.. _ _ _ _ -
e
w,_
q
t
J o
p M f
1 w.. . --
e 8
a
p
CP- 2
rr
rr Q .•
37+
TLlNE^_._
e LLI ox
41 Vt'a
33+ 00_ =_
I_
c i
34+ OQ , T LINE __
F- y+EER r
f t3 r c*"
D11- 1
W16- 6P I
i Q w ;
f:, __ w
r
t4
y
3 d'.._ . 0 . . _. _....}, —. ._ _ .._ .._ . t __ t€.. i... v,... r. P 1
Q 51
e cco:
k at aa*
t
R W ...,
m_ __ I
i ." R w _ _-___-___
y r B L,.._
3 t
r a
i::. - -
f f ll
Ii '
s. I
x , j ` C- ` D11- 1 Q
r f(`
E y., s
i f
ii r. i 1 E 22 M
a N W
E- " i s
i E i I F
71 74 CONTINENTAL ST 1 t24 GONTWENTAL ST 113d CONTINENTAL ST 7 156 CdNTINENTAL ST ' ' I I m . i
r w f 1155 LIBERTY ST a
MATCHLINE° T° 32+ 5p Q W
W
o a a
MIGR45URFAGING
LlMila
z
W
STREET L.IGHT ( STD de LEQ LUMINAIREj
SEE REU PIAN-- IEET 24 Q a
d W
1201 CONTINENTAL 57
12] 5 CONTINENTAL ST

MICROSURFAGING
1: 1MITS FOR CYCXE TRAGK l L
TREAiMENTS SEE DETAILS
s" EET ' 4

C NTINENTAL ST
yy aa...___.. _._ __. .,_ .__.__, - --_. __,__. _.__.__ ___. _,_. _---- R fW--- -,-- -- -..__.___-,--_. _,_._ _._. _.___...___,..,_ I,___'_. m _ U U
t --_ ,
J
i
w_:
a... -, ' _,_-:___-__ _:-_:- :> _.._ __., _._ _ 1 ______ t. i_.___. u_.._..__.____. ..____,_ _.__ __._..__._. .,.._ _.___.__ _._ r
a-. .-._- - _ --__ ,__- ., >, __„' i_ .. mr i
s _.
r} v°z
I .
rar rrP r+r . ct

0. r
er er. rr ra .
s - s
i,
C? q.
m
H pp r a, a,
aT I.INE ''° 39+ 04 i a
40+ 00` s a
49+ 00 • r r a r
42: qQ
T- LINE °° 43+ W +
V
g { ry I_ I
N _ T—' - F I W W x G
J 1 o a ,
S aS r m
Q: N.

P

64. C•: ;
E
d _. - rr s_.. _._ ,-.
v.
ti..

O tt r . CP o2fl, 3,,
a
I _ E, Q
t _ __.---- _.. ......___..__.._ i
y' '
t. _._._..._.
4_ _.

R W.._,__:___.,.___. —,---.. __,___ 1
l.` .,' L ____.__ _._. W Q f
t
k
I
R/ W -_ ,..._______.._ W 11 U:
r
u
Z
t E
22 I- pf' 22 S' TIiEET LIGHT ( STD dc LED LUMINAtRE)
w
PARALIEL PARKING UNES ( TYP} j E SEE REU PLAN- SHEET 2S SURFACING' SEE SWEET 14 Q G
E
I
I
r W i j
t7 2 5 5 LBE RTY ST W
f 1310 CONTINENTAL ST 1332 CONTINENTAL ST I m >
2 Caltrans I? Gt2, Encroachment Permits Office z nP 0 EP" E n Permit## 4 0223- RIS@ 0395
A- 9
Da: 29° 923
ORIGINAL SCALE:

Nc, te t niy plans stamped u ith this appraual REDUCED ° - zo
shall b ualid fc r permit ccanstruetic n wcirk,
PLANS
oa:, uNE zoza
SHEE7 9 OF' 2G

APPROVED
Packet Pg. 632 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation STREET LIGNT ( STD & lEa LUMINAIRE) p5
SEE REU PIAN- SMEET 25 950 BUTfE ST
wN
26 1275 CONTINENTAL ST
P
Q H
FOR CYCI.E ' tRacK
MATCHUNE° T' SO+ QQ
rr
7REA1' MENTS SEE p4" t'
F
2 r j
il ` J
o
c r i It11- 1 RAHA' SIGN
MIGROSIlRFACINO DETAILS t N SHEET 1# u
f`
1 1
ur s I ' CO NTINENTAL ST .

R/ w,--, ;` r I
n.
aea_..s crr
r _ ___. °°
i;
w._
t
i
w_
O
2 p--
f
f/ . f..
y.:_
y,....... . :....._._ .... v
I e= .... .. . k,. Fi
p „_
p
3 O
i-= _ _ ._.__ . _ L, ' s;,,
a "
lS,'
t' ' R3 r_ r. iv u ' h" r'7`..:

A....
z
r,
i
s s s r.. . w
j
r f N. jy 2
i
11J. a r r i .qSi. p a r," a 00 + s F .+ pg '`. ,
x:
m
Z
m f'

T LINE ,, F T' LINE
I--- s- f- - I
G .

U r
f

HIGH SIBIUTY Y W

F CROSSWAUC PER
o
F
F
N
l,. j i G C
i
CQRCS PG. 176. 00'
p'
aEEa
r'
w
w'
r -._
F . . .. . .. i.,_,. . r,-
6 f_._.,-._ _ _ ___. _ __ _._ . _.. .._:.... .-.._ . _ ... l
I J".

P Q
r
Q
S b U
m._..._............_...__..... n L a_..
i._ .,
f.^ l.i
r"=
u
a . .... .._...._ _. ....... _..... N
R fW..._
F2/ w ca'
r
rr 3,, t€ 1 SC? 3N'..
39A g
a w._
22 fPARALLEI. RAR} tING IJNES ( TYP')
p
E.
5EE SHEE7 14 MtCROSUR ACIN6 E i
I"
n
t/
L1M17S l
E"` t 1` a ./ i
E 4 a
f
3 W .
i ' 4, INSTAl1. RADAR W
J 1f 1441 LIBERTY 8T
OE7EC110N'
N
EZ
W
Z
Q

0. p W
W A
95Q BUT'[ E ST STREET UGHT ( STQ & LED IUMINAIRE) 900 BUTTE ST 886 BUTTE ST 874 BU7TE S7 862 6UTTE ST I SEE REU PLAN- SHEET 26

I I I Q
S"fREET UGHT { STD dt LED LUMINAIRE) Q
MICROSURFACING STREET UGHY ( SN & I. ED LUMINAIRE) SEE REU PIAN- SHEET 28 FOR CYGLE ' FRACK U M SEE REU PLAN- 5HEET 2S

TREAITIENTS SEE DETAILS
HVG
3$ ON SHEET 14

UTTE ST
a.w- ;,.,._ _..,____ R/ yy,_,, ___ -,_______.._._ _ 4a'___ w,.,__ ._ z.°. s-_ ._ z` t sl 3,
i Yt
Jl - ,+, f i . R lW'.. ,__, .,_._..,_.. R,_..,,_..
yry
t_-_::. :. tf._..::.:- - .— .. _': .._._.._ / t. ..
1 .
r,
x-..—..
m.. •, zm. ........ .,.. .. ,.:, e.. 1
l , ....... . .,
1 I
4 r. ,....,.. ..,.. ... s._. =... ., - .... '. :.__ :-.

W
a _.. .;..' a .,_ y. ..._._.. „_ . w— z, r.
4 ". 4V
v O ,,..:. Q
r^. C7 ' k ,,. 3=` l.9T1Y-TV7. f I • e w a. .. . ClPBYf Y i.17 y e s T'. 7 _.. O m m W 2
ua.
aa
f' r s a s a J c r. r s a
x. z
r s r a s a
W
j s"n C7
61+ t10 ' T LINE ° 62+ 53+ 00 S4+ IX1
T' UNE 55+ 00 Z m Q
e
2 J
a
F
St` 1
S
T Q
C) Z
O
g
g
Q
r r
F
r r r r v{ r
I r r v v r r r
jJ Q
I LlJ
I
tr i _.._ t f
w
s r t--"_ --_ -_,_ . _-_- Y . .,
z
u _,.____,,_ ._._ ., f...____ . w,., _. v_..._ a Q
E. .
v_
o t? i f;
n
R y '
k. a

7. _..., -----
CY
m w ._.., w. 0 w A_<.... .,--
w _,_:- s n ,_ _._,m _,_.
845- =-= _ ._ -
R W- _ __=
w
I I I 2

BUTTE ST
Z
Q11- T 22 PARALLEI. PARKING UNES ( TYF)
SE E SHEET 14 M ICROSUR
FUM TS
W
I m °
D >
LL Ci
a
979 BUTTE ST 95t BUTfE ST 939 BUTTE ST 933 BUTTE ST 931 BUTTE ST 929 BUT7E ST 831 BUTTE ST F z '
Calcrans t 02, Encroachment Permits Office m
PLA, IS 4 CEPTE[ 3
Q
Permit#: 6J223- t P1- t3 45 1 Q
Date: 29J2023%
Note: OnBy plans stamped woth this apprtaval
o ciru scntE:
shall! e valid iar p rrnit construeCian ork.

REDUC[}
t"- 20'
PLANS' +
uNe aozs
SHEET 10 OF 26

APPROVED
Packet Pg. 633 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation C Itrans C C}, W Encrc achment Permits Office
844, 840. 838, 836 BUTTE ST
A
810, 820 BUTTE ST '
STREET Ut iT( STD & LEd LUMINAIRE}
FOR CYCLE TRACK P rmit#: 223- 5- 345 TREATMENT SEE DETAILS o SEE REU PI.AN- SHEET 26 QN SNEET 14 STREET UGHT ( S7D & LEd IUMINA RE} ..

MIGROSURFAGING SEE REU PLAN- SHEET 28 N at: 3nly plans tamped uvi h this approval UMITS
iu----' E T sh il be valitl fc r permi ccansteuctitan work. J fw.__._... _., _ w._ __.. rr________ r.__. .._, ww __ . zn
s i `
r
f
v??. >:-., l .:,_ C_-_: '
r ._
v_. _ _. ,:--. ._.._
a
n ._ r...-. .._
t t
z, _.....
a cai.

C . , 1 r
r.....
t I
w 7. 7 1tt 7 iTtI1T. I . .
wn, r.:. '?... f 2: tC1
Lf1 t
i i i. i i. i i L i i i i R, i
f
f
W 40 57# 00 58+ 00 59+ 00 BQ+ tq
R
T LINE o
1— — 1——--- T'- iye_„
Y o w
x
t,
F"' 81.} d ER y
L T 7: g ra
T'
r r y r e,
y @ @ r r Aw 3
u
i ::_.:, . :::. . . :. _..___ ti _. ..,::

E.. ..__._ ____ _"-.. \ ,,,.,.,,.,,
s,,,,.. s.,. s... . 5,.....,

4. rv: .
y '".. i1,:: : :-: , P a`' t:.,,.
e ,... op
e
P .

G l
I, R W-_.= .. ;_. _....,........_ ....__,._. _ , m...._..::.:_ m..:'.::::.

Q..,.............
4 1..
g
S.__...__. ._.. . y
a
iC J SMJ3H* St.
r
y_» r__ L_ R
I __. . $.._
p K
I
1 a R,.
h
32 PARALLEt. PARKING LINES ( TYP) r , V ` a z
5EE S IEET 14 f ° C. H
i,
t, 4.
i : ! w
1 Mic osuR caNa I a "' uMirs r W
I I
i: I = I'. 1
a '+
S . .
a.. 3 1, 845 BUTfE ST 81 9 BUTTE 5T 11 BUTTE ST j 755 BU7T6 ST I j
i ( E
I w
i 4
t
a
p W
W d
p i
i o MIGROSURFACING t
uMrrs r
j FOR CYCIE TRAGK
i TREATMENT SEE DETAILS t J
UTTE ST r
oN s E 7 7 pv
M,__. m,__ ,
o
vR W n._._._ __._._._._..,,..__ __.. __._.,....._. W_.._ ..... .... _ _ .. .- R/ wti_.,,,._ _.. ., m a I t _ C f j
M . ..
x.._......_._ _._ _. I ... :. 1_,:, _. k ._._ _.._ . i.._ . . _. k . ._ _ _._ 4 .. r... r
xa tra
r
W
z tt?
8E# QQ T' IINE 63+ 00 84+ 00 66# 00
1_
m
t - F-- - E`— - I-^ I T NE_ 88._
i
x Z
n C?
3 g e/ 1
1 i__ a
m
u, n...-
a_ , _-- ._. a__ -.,._ _.- _.-_ . ._ .____ _:_ _.: _ am-_-_- _, ..- -_ _ _._... _.^, _,--_ ,__ , _ _ a. a
cF eos'
i
i
22 w --- ----w.

O
4 `__.. ,. _.._,,,.._, m_.. v.._... .,..___.__..__, . .. ..,...___.__ _.___ t R;rw..._-_____. a.— rv_._ R/ w._.. _ _. ___ „
e 4
4 -
r Z W d
3' e
E4 ....._.,_......_. u.._. 1i,' ..._._...,...., _:; .............. ...._...... " 4. ._._..._ ...._ l..r r_...--.,:.... 1 .._____.__; ._....,.._ MICROSURFAGING s, -.._: ea "-, t,
pp .
uMITS 4.
o
z
ot t— t w
Z >
733, 735 BUTTE ST
z
Q
amz
A- 11
p6G yg,+ C
ORIGINAL. SCALEt
1 1.. CJWVLD
7 m 20' .

PLANS oare., uNE zoza
SHEET S1. OF 28

APPROVED
Packet Pg. 634 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation Caltrans D[ 2; Encroachment Permits C ffiee =
ty
P ! S EP1' E
R rmit#: 0223- IV N=03A5 a
Date; j29J2A23 J^
Note: C3r ly pl ns starriped vvifih this appre val v`i
shall be valid fcar perrnit canstruction vork.
o
n< N 0
r
1 U
1 t
FQR GYCI. E TRACK TREATMENTS g u
SEE DETAiIS OTV SEE SHEET 14 MODIFIED R81( CA) 1 j , ,
9` '
R81B 0 ; x '
t
MICROSURFRCING R_
cP sot
Uhi1TS
µs
l 1
w_ f
y ` `
w.... R 1
n
ow
g j
ti ___ _
R+
i
r . v m t
r
b ; s.. 4,x
STREET IIGHT( S1U & CED LUMINAfRE' y
a , t,
J
S REU PLl1N— SHE T 28
GC ,
r r(
f`
7 "• .
r., z s, w
I
r:.. s ii <,
SF
IghJ3} 1#..
o p
F
t
4 y... . m
i ...._ _., ,._ .--
F
z_. ,. ._. _ _ — — if2AFFlC STRSPING 0.ND
o 40 PAYEMENT MARKINGS W
x
C1 M"" Q 2
N. si...,.
t.
x. ea„ 9
m
b
a.. 4.
z
w + " r we
BUTTE ST s+ oo t, ,::,_-----'—` 3
T' LINE Y e a
aoi
ao `
e'" a
t
U
3 u n,
w„
Q
R a4
r. I C
t u
r ,..,
p u
f __ o
w
Q
f"
Q,,
n
MICRpBURFACING t—..--,,_—_,.___ __ _...z. LiJ L
LIMITS 38 lL
9M u. * s'
RM
C1
R/ W—___ R81 GA
Cf
iy
V'
K
J
m
a
N
t,3
W =
O "
a.
m
z
d
Q
z
0 F=
w
z
0 -
t- o
U3
Z
H
w
Z
a
m0
A- 12
os ciruLL sr.:

REDUCED ''
ffi ao'
PLAiNS
JUNE 2023
SHEET 72 QF 2&

APPROVED
Packet Pg. 635 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation wN
Galtr ns 02, Encrcaachrrtent P rmifis( ffiice
P S EP°TE
THERMOP' LASTIC PAVEMENT Perm t#: o223- Ns- o3 5 Q

THERM PLASTIG T FFIC STRIPE PAVEMENT MARKERS MARKING
sroP eox IVate: C nEy plans stamped with this appre v l ' aRiNc 9M 22 32 TRaK; 39 39A 38 e KE xwax
CYCt. 22 32 38 9M sfiall be valid for permit eonstruction work.

J
I. ANE STOP, TRACK, zo i
ARROW BARS, FWY, 8US HIGH VI5 BLUE SYM80LS llMR LINES,
6" SOLID 6" SOIID SYM80LS E C?NLY CYCt_E HYDRANT p o
4" SQLID 6" SKIP a
pOUBIE 6" SKIP
6" SKIP 8" SdLID fi" SKIP 6" SOUD ARROWS UNES, HICH SYMBOLS TRACK 7yp D TYPE D IYPE G ' fYPE G NxINc XING
w
WHITE WHITE YEIJ_OW YELLOW YELLOW WNITE WHITE WHITE- WHITE WHITE WNITE WHITE GREEN 7W0- WAY TWQ- WAY ONE- WAY QNE- WAY TWQ- WAY 2 LF LF F LF' LF lF L" LF SF SF SF SF SF EA FA EA EA EA w 532 725 9, 485 2, 856 4. 800 9. 930 216 629 79Q 308 4, 086 190 4689 395 119 26 3 70 z Z= Q
28573 10061 553 o w
R{ c b
LEGEND FOR STRIPIN STRIPING NOTES:

Qw
n

TYPE ARROW P
10' ( 14 SF) 1, PAVEMENT ARR4WS SHAIL 8E CENTERED IN LANES:
sr 3a
Tl'PE I ARR(?W 18' ( 25 SF) 2: PAVEMEN7 ARRQWS SHALL GONF4RM TO C RGS, PAGE T72. 00.

TYPE ! V ( R) ARROW ( i5 SFj 3. 51RIPING DETAIL NUMBERS REFER TO CALTRANS STpNDARO J
TfPE IV ( L) ARROW ( 15 SF}
PLANS A20A, A208, A20C AND A20D,
7YPE VII { R} ARROW ( 27 SF) 4. GRQSSWALKS AND STOP BARS 5HALL 8E 12° THERMOPUiSTIC. c , 10' FROM INSIDE STRIPE T0 INSIL7E STRIPE}
XX — ALTRANS TRAFFIC LINE
OEfAIL PIUMBER
g
BL — BIKE I RNE SYMBOL & ARROW
W
a — BIKE DEfEGTQR SYMBQL h
Z
t]G
SH — F ARED 81KE SYMBOL
W
NV — HIGH VISI8ILITY PEDESTRIAN CROSSING
AT CYGLE TRACK PER OEfAIL SHEET T4 r
J, — HIGH VISI6I IlY CYCLE TRACK CRQSSING
GREEN) PER DE7AIL SHEET 14 Q
W — CROSSWAIK
U
J
g — sToP eAR
C; pLAGEMENTABBREVIATIONS SlGPI LABELING
t1.

GREEN CYCLE TRACK RM FREM4VE SIGN _.__ ------- -- GC — I S INSTALL NEW SIGN EXAMP E t7F EXAMPLE QF x
REMOVING A SIGN INSTALLING NEW SIGN x
SSBM
V
STRAP & SADDLE SIGN BRACKEf , MEfHODTa Fx
NOTES:

U °
z W SSBM IS USED WHEN W11- 2 R1- 5 W s F.

MOUNTING 70 UTII.IIY POLE is- 9P

OR STREET LIGHT
m Q
7 SiGN QUANTIT( ES
d CALTRANS GQDE D11- 1 R81{ CA} R81A( CA) R81B{ GA) R9- 6 R24 R32G RABA V1116- 5P R61- 7 R61- z @IKE YIELd TO 2 HR PRKG
m
J
DESCRIPTION 81KE RQUTE BIKE L4NE BEGIN END
PEa PARK PARALLEL _ RABA STOP LEFf ARROW ARROWS ARROWS ft C Z
REMOYE SIGN OUANTITY 9 t d Q 0 1 t 1 2 p
NEW SIGN INSTAII QUANTIlY 0 7 1 1 7 q 0 2 0 d 2 j
m
17 FA SIGN REMOVED 14 EA SIGN INSTALL a
d
m
NOTE: SIGNS SHALL BE INSTAILED IN QUICK- CHANGE BASES" PER CORGS, PAGE 152, 1-0, NO PARKING SIGN PER CORGS, PAGE 152.02 A-13
4RIGINAL SCAI. E:

REDUCED ,"_ 2'
p'`.

QATE. JUNE. 2023
SHEET 93. 6F 26

APPROVED
Packet Pg. 636 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation

CYGLE TRACK T EAT E T DETAILS
WN
z
22" 2z°
MARKER POSf PER o
sPeciFlCA noNs ( rr)
BIKE LANE z4 12
NcrH
2M 12" 8, . n,P r

PER PLAN
TM
a
I
B KE ( ANE—- 39 4" TYP o 0
2° MiNiMu t)
PA LL.EL PARKING LINES
TYP. 39
SCALE: N. T:s.
8 a
ZVs
y W
2"' I itP TMp
A r
d @
dr Z= Q
a
o g a."'i.. . W p LENGTH 20°
NOTE: A L CROSSWAtK MARKINGS SHALL 8E P
P R PEf2 PLAN 120 MIL ( MIN) THtlCK THERM(} FLASTIC a ER a IENGTH
PER PLAN a ZLL HV HIGH VI5IBILITY PEDESTRIAN CROSSING AT CYCL. E T GK a „ a TRAVEL ANE 2QM
SCALE: N.TS. o"
P
4w( s*

BUFFERED CYCLE TRACK
4_/ SGALE: N. TS. 20
W Q z
w
TYP BA BL LENGTH w
CYCLE TRAGK GUIDE LINE I PER PI, 4N o a
J SCA E: N.T.S.

DRIVEIMAY
Z
W
Z
QETAlI A
FQC CI d.
z Typ
THIS SHEEf TYP.)
2' T' fP W
W 1
cT'- NOTE: fiLL CROSSWALK MARKINGS SHALL 8E
o r"'
T i . w"°" o 12o M! L ( M N) rw cl{ l'wERMOPLasnG 1
l
T} il5 SHEEf,"'`
r

HVG HIGH VISIBILITY CYCLE TRACK CROS ING( GREEN)
F=
SCALEc N. T;S. V f.}
r tJMIT 11NE OR m

Q GROSSWALK
DRi\/ EWA Y C( CLE T GFC AREA p.

SCALE: N.T.S.
x
2 ` x
a=- I w
Z
J
GRI SPACING: 3a .
vi
A = 4:5 S0. : j 0 Q. ..
6" YELLOW 3" g'
BA BIKE LANE ARROW ry p'„
@
Z
fJ
d F
N W
1 q 1 GY L T K$ TRIPING I I o
W
J
SCALE: N. T.S: V
r m p
1— FU
Cal rans D02, Encrc achmer t Permi s C} ffiee W
t8' F , A CEP' fEG N w
r2. Permit#: 02 3- 5(= 0345 m 3°- 4--)
cRio seAc Hc: a' 2 s C ate: 29 2 23
a- as4. Fr.
gL LARGE BIKE LANE BD BIF' CE LANE DETECTf3R SYMBOL ly plans starr ped writh this appr+ val o SYMBQL 2' cR a)
shall be v iid fesr permit construction, rc rk.
usE oR e' acE aNEs
A- 14
B YIELD TRIANGLES six orz nno E FEes wiD
oR c- s:
sc t.E: N. 1. s.

RED UCED • _
za'
1' AN :

DATE. JUNE 2023...

SHEEf 14 OF 28

APPROVED
Packet Pg. 637 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation T f IT 1 I
e
QF RAMP T' 17+ 62.2 44. 1" L
i T 17+ 62. 2. 40.;' a vrr,
FL= 565. 6Q 2 1
MATGH E TBC= 667. 10 E; j 8C, T8C= 587.11
r
t
6 3 i
E
JP
E
v
E
1"' 15+ 87. Q 3Q. 4' R _
W
v'i
J
r. ._._ __ __
t_". ,' - q, .
15+ 60 2 0. 4 R
c a
MATCH 6 SW MATCH E 3W
J zu
j 8 n
FG 5&6.( lQ Q
o
o
o
w
N
6 _ 1 CalCrans DO, Encroaehreienk Permrts Office 9
5 ca f
1 Q PL.{ PlS CCEP7£ p e
4,
o r t Permit#: f1223- tV5 9-0345
s
a
R fW._.._ .__._ ._, ___._—_. r. I a} i+`.''` ,'"` C7at2: Bf28J2023 a x "' r "
I j Note: Only plans stamped with this approvat
ehafl b vaiid far permit consteuction work, 1
r „ ,
T° 17+ 45. 1 28. 8°L L-t2. Zy_:., l.I.

MATCH E TBC= 567. 00 OF RAMP, FL= 566: 55 u
c

TRINITY ST
s"
Tae= e. 00
TAIL "
SGALE 1"= 5° ET ' L 2
1 z'
SGALEs 1"= 5' n
o a
T' LINE te} s ( z" vc,) T' LINE F— CONSTRUCTION NUTES
t'-
E s tz,,, vcP)
SIDEWALK ( 4" PCG W
PER CORGS, PA E 131. Oq
cuRe ar o curr R ( s" v Z ,,
t
a ea cs, PACE 3s. 00 TRI ITY ST a a.

MODI IED CONCREfE CURB RAMP
fYPE A} PER CdRGS. PAGE 141. 10
V
4 RROTECT IN PLACE FL,- 56';75
5 REMQVE ( E) Si4RM DRAIN PIPE
tE) w { 8" c)
O
r
f) '' t. ) F" >
T' 22+ 045 28. 5"R
V U
MdDIFIED CONCREfE CURB RAMP 8C, FL C- 560.67
fYf' E C) PER CORCS, PAGE 141. 30
EG, THC= 561. Q7 m
T' 21+ 29.2 27:3' R

MATGH E YBG
T° 22+ 23.2 27. 5°R
Q'

MQDIFIEQ GRQSS GUTIER
PER CORCS, PAGE 128. Oq x
MATCH f T8G
axc
G4NCRETE GUR6 RAMP PER CALTRANS Q t, P, o
STQ PIAN DETAIL A88A CASE B r
4 r
E) a ( rca esP) E) o ( o" csP 3
w
EXISi7NG DEfEGTtiR LOQP FiOME RUNS. O _ i
M14
r
a
m J
8C, TBC= 5B3:Q7 c c c
Q

PROTECT IN PLACE
ck., 22 DOA 33. 5"R a- 1, BC. f C= 560. 77 c n``'' c"'
a kY,` e
e a.

Q f =-.'
1` i
c'
I
1lJ
CURB AND GUTTER RER CALTl` ANS STD 290 c xd 10 PLAN DETAIG A87A'( YPE A2- 8 AX }„ s,
F1= 5s2. 50 t+ : z
g 4
2 5 f T 22+ f.i. 3
9 `` 4 _ ----------- G TBC= 561. 30 Y
l t"--.-... fR w.._._ i i i
l _`-___
i _. -____ ...

W- _ . ___
m
i i 7 F— i
I t
EN D TR APlSITION W q. 1 t3
LEGEND II T8C- 562. 99
q, Z
i I a> m
II
E jl E 3
E a i sI
0 2: 5" AG 3
f 8:5" AB I! i i
I
I r E m

MATCM E) TBC I
I
E I I BEGIN i'RAt SIT10N Ta i, E A-' 5
s' cuaa a cuTr r
DETAIL 3 T' zz+ ao. o as: s' R o,. s:
scALE: =
MATCH T EQucEo ,-_
z0
PLANs ,:

N zaz
SHEET 95 OF 26

APPROVED
Packet Pg. 638 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation W
SUZ
a
Wo. o
Q
J
LEGEND g
1d59 GONTINENTAL ST
f. ___. __._
a
Q 1• OFF ( E} E4P Q
CC} NTINENTAL ST 4
t
4 .,
z:

0. A
o T- a -
1 i o
f2 W _ ._..__ _.,_
e ,. __
t`_,,. ,. _,. -. R y„ _ k
85' ` B
w._ __.. _..._,_.—_ u.,.
u.. 3
c
a,_._,_, .. t
z
O, y Q .>.
d
c s22 t SAWCUT LINE
E *
T 33+ t t. 8o 15. 2°L
as+ oo j°Q ' T" uNe - -— -
F- F - -----` -
1 OFF E LIR OF GUTTER 4 W a
o#
4 r
a
r . ... _,..__...___.__. _....... _ `' ..._.. ` . - .. _ _ . S i•: . __, , ... . . _ . .. _ ..._ pa$ Y C1
i Cl i
tit. : --
141 t,
µ
t.
f i
r 1 1^ °
a°
i"
s.,
r
m_ . __ R W_._, __ ..
1" o
z
I {!( ". Y Z ° 2
6 `
i
15" i11"-. +
Q ,
53 w
I i
il( k:
i
I
k ii I ``- i
4 I, i
I @ p 1025 7RINI' FY ST 1114 ONTINENTAI ST 1124 CQNTINENTAL ST 1130 CONTINENTAL ST 1156 CONiINENTAL ST W o
a.DETAIL 4
w SGALE: 1"= 20`
W
Z ,
Q
a
LL1
LL Q
Q hy
J
U
GONSTRUCTI N N TEs w_._= __—__--__--- 2-___._: __ ~'

1.___
a S a c•
3 P, PER CORCS, PAGE 131:
d0
1 5 .
a cuae arvo cur a ts• v
r}
x PER CfJRCS, PAGE 138. 00
I ,
W = j •
QMODIF1Et1 CONCREfE CURB RAw1P
r TYPE A PER COR{. PAGE 1 41. 1
z-- o
c
zc iaoaor
J
Q
a _ t.. .. 4 l . r, CfCJt'."'
PROTECT IN RtAGE
a
W
e__ _..__..__.,_. _... ---...___. .____._._ ___...__ ___: __. _ .._,._ T 47- 1+83. 7 28. 3' O
L. T' 48+Q5. 7 2$, 3'
MATCH E T6G= 521: W
1 MATCH E TFJC= 521, 4
yr OF
RAMP
m FL=520. 75
fa°"altrans C 02,Eneroachment Permifis Clffice U?
z C NTINENTAL ST rvs r
ac Per ni#: 22- 5-
3A Z
a Date;
202 A
L. IVote: t nl piai s starrsp d with this apprc val
a
Z shall be valid fr persnit cr ns ruction+ n ork. SCALE; 1"= 5'AE.
16 ORIGINkI_6CAl.

REDUCED t' :

ZO'
PLANS oare:, uNE
xo2a SHEET 18 oF

APPROVED
Packet Pg. 639 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation N
Caltrans DC 2, Encrcr chment Permits G3ffice =
fUS; EP'TE
z

1. THESE TRAFFlC SIGNAL PLANS ARE ACCURATE FOR ELEeTRICAL WORK ONLY. N Perrnit#: Q223A BS- 0345

2. FQR ACCURATIE RIGHT OF WAY DqTp, CQNTACT RIGHT OE' WAY ENGINEERING AT LIGHT'° " DARK" CONDUCTCIRS Of EQUIPMENT t` J
o

THE CALTRANS DISTRICT
2 c7FFlGE.
f,
Notec C? ly plans stamped with ihis pprc val
3: ALL WORK TQ 8E DONE AND MATERIALS SUPPLIED SHALL BE PER LATEST i
STANDARQ QR POLE Shall be valid fic
r permit canstructic
n ve cark.

EDI110N OF THE CITY OF RQDDING CONS7RUGitON Zo
Z STAN RRDS, GAL"fRANS 3
srANDARD PLANs ANo SPEClFlGA11oNs DA7Eo 2022. PUSH BUTTON ASSEMBI.

Y POST
Q

4. C1GHT TEXT ANO UNES INOICATES EXIS11PiG AND QARK TEXT AND UNES INDICATES PROPOSED.
t
ae

A STANDARD AND PO

E LABEL

5. SEE GALTRANS 5TD PLANS IJST ON SHEET A3 FOR AdDITIONAL A86REVIATIONS, LEGENDS, SYMBOLS, AND DETAILS USED IN CONJUNCl10N WI1N THESf TRAFFiC CONDUIT z
Qo
SIGNAL PLANS. a ¢
o
a ,

6. ALL S`IGNAL FOUNQAl10NS SHAtl WAVE 3' MINIMUM CLEARANGE TO GAS ANR L1 1 CONDUIT LABEL
3 o
ELEC7FiICAL FAGIGIIES.
n
7 PROJEG7 CONSTRUCTION NOTE 7. IF EX1S11NG L P DETECT4RS ARE DAMAGEO DURING BNSTAlCA110N QF NEW LOOPS, REPCAGE DAMAGED LOOPS H1TH NEW TYf'
E
A ANDD t?R TYPE

G LOOPS
NN
AS DIRECTED 8Y 7HE ENGINEER. I- C=- VEHIG
E SIGNRI. HEAD y ', a

8. ALt SIGNAL HEADS SHAU. 6E LED TYPE WI"fN METAL HOUSING, BACKPLATES. ANQ LL YiSORS. HOUSINGs, BACKPLATES. vIs RS AND MOUNTiNG HARD4VARE SHAtl BE b'' VEHICLE LEFT—TURN SIGNAL HEAD BLAGK. BACKPLATES SHALL 8E L4UVEIdER AND SHALL FiAVE 2' YEILqW a
tsaaa
p
RE'1ROREFLEC7tYE STRIPS. VlspRs SHALL BE TUNNEt T1'PE: at, ' m PEDESTRIAN SIGNAL HEAD
9, SRLVAGED TRAFFIC SIGNAL E4UIPMENT SHALL 8E QEIJVERED TO CALIRANS w
ELEGTRIGAI MAINTENANCE YARD A7 5065 MOUNTAIN LAKES 60ULEVARD a SIGN
a
w
REDDING, C& 96003. PH NE ( 530j225- 3QG2.

N
z
rr
y rl,.ry m \ Q
a
VIDEO LJ 10. lHE CQNQUG70R SCHEDULE IS FURNISHED pS AN INSTAUATION GUIDE QNLY. I7 t7ETECTION CAMERA Z SHAI.L 8E THE CdN1RACTC 2' S RESPONSIBILJTY TQ PROVIDE THE APPROPRIATE Q Uw NUMBER tdF CONDUCTORS REQUIRED FQR GOMPLETE OPERATiON OF 7HE S GNAL TYpE
A LOOP DETEGTt
R
W
w
3 0 0'
a

11. ALL SIGNAI HEADS ALL BE C6VERER AFTER 1NSTALLA? lON ANd BEFt RE SIGNAL ' iURN ON. 51GNAL CQYERS SHAU. 8E FROM 7SSCG 4R APPROVED EQUAL B IYPE
C LOOP dETEGTOR I—
NO CARDBOARD OR GUNNY SAGK GOVERS.

72. AIJL CONDUITS SHALL HAVE BUSHINGS
W INSTAIIED PRIOR TO 1NSTALUNG TYPE D OQF DETECT R
C4NDUCTORS. S7EEL CONDUITS SHAI1. WAVE LAY IN STYLE LUGS THAT ARE GAST INTEGRAL WITN THE 8U3HINGS. Ail CONDUITS SHAU. BE Cd TRANS SPECIFIED r TYPE
3 N TN THE FC)LLOWING EXCEPTIONS: pULL BOX L J
Q
INSTALL TYRE1 CONDUIT BETWEEN THE SIGNAL POLE FOUNDA11oN AND 7HE NEAREST L SERVICE EQUIRMENT ENCLOSURE PUU. 80X.

W
ALL EXPOSEq CONQUIT 5HAU. BE TYPE 1.
r CONTR( 3I_( ER GABINET AND FQUNDATION IY t;/

13. 1MTH THE E%CEP110N OF NEW CONDUITS FOR ANY NEW AND RELOCATED PULL 80XES. CABpNETS, OR PqLES, ALL CONDUGTQR AND CABI.

E CHANGES WILL OCGUR INDIGATES T0 8E REMOVED Ca
IN EXISIING CONDUITS ANQ PULL BOXES.

F U f„Jmaxx
Q = w
m
m °
ww
a
W
z
cia
a
au. Q
OC
Z
N
N
0a0m
E=1
oRiciru scn e:

NONe
DATE:. 05- 05-. 2023
SHEET
7 OF
4 APPROVED
Packet Pg. 640 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation s WN
t r'.
j
RS EXISTING CONIRQCLER CABINET, CONTROtlER ASSEMBLY, AND BAT? ERY BAGKUP SYSTEM ( N SIDE- MOUNTEO 4 ,,
z
CA81NE1: RESET ALL CABLES AND CONDUGTQRS.

DESI6N SPEED = 30MPH f I z F
t o
r
a
RC SIGNAL P AND MAS7 ARM. FA AND REPAIR SURFACE IN KIND. RS S NAL EOUIPMENT. 1 i) i " ' 4 ( ` 4
r
LL ` W'
I
I i £ _
o('
k
u.
i 1 E . t.'" s.._.'_- _
RL YID60 CAMERA TO NEW POLE qN SNEET E- 3, RL td6 APS TO P01 C ON SHEET` E- 3. f ii
i j y
t
RC SIGNAL MAST ARM. RS SIGNAL EQUIPMENT. L J L J ( G
I o z
Rl IDEO DE1EC11QN CAMERA AND STREET- NAME- SIGN T0 NEW POLE ON SHEET E- 3. 140' TQ ` j i n CROSSWAL} f
j
i _ . o Q
I f
f 61 AND 05 PROTEGTED/ T ERMISSIVE FLASHING. YELLOW ARROW OPERA110N c, 4 EXIST 3- 3" C, RG EXIST 12GSG, 3CSG; VIDEQ CABIE TO POLE 8. c I( 1 f
t (
j aJ
5 EXIST 4" C: RC E}qST 12GSG, 3GSC, VIQEO CABLE TO QLE B, i ' i j pL
cv c
i C
z
6 RS EXIST 4-- SEG170N SIGNAI HEAO. 1 I' , ' j
m
a m
1 i
I Z
m
Q.
i
s
7 EXIST 2 APS CABLES FROM AOLE 8. E
ii i_. p Caltrans 02, Encroachmen P rrnits Offic w
i
III t. G' b. P$ 5. 4. bnS: R` B.. f
O . 0.. V
E
1 ii
f GYtTtl#: Q`-' 5
4Yr+
X y '
t- ' j
i E
i i
Dat: f29/ 02
w;
I r , Vote: tinly plans stamped with this appre ual r
PL ri I I! shall be ualid fae permit consfiructior wark. 4 ( 3,5, <` 93
I.. y :......... r' .. i( Y I , i
i
rn ri -' ii i 1
i
II I I I I _
I
f I 1 LL
e z

I I I I I E
I i
I I iRG lJ 1 7 I_-- i ( r
I a ,
w
I - I I I 111 . 4, I APS 2P,03P I c~a
5 I I I 13 1 y^{ I
Ii. . 11 f$ 3P.` I I 1 I i ( ..,. f
j-`'i;- i 7;1; C(( / a: a
103P1 I ,. I°. Q . a. .

Rfw
J
3 `-" ,
i IE" I I 1 _ T,- -- rY'" `'+,' i
4 ii-- Rrw Rc
r-- ,!
p ! `` ki4 % .=.,_-/ w,.._ ___ , ----_--- _-- ----.---- w—
r ;. ._ ._ ..

C_.—._.---- .,_,--.. __--.:___...;.— _ - _ --_ - _. z y i. .

I" t _ .;
i1S 412 '' i`.+,. i! f4. -..-- . . . . . .
f.___ __ _. L_
I C
RL APS 06P ' CIz
t..,..-- ._ G.,.. S c . I. ---- ,,:._ E.._u . ..: .. r_._. . ._ I' L ,-;,.

T„ Pk 1
s a
02__
r; itts. t T. u,,
3' i - -&_ ___ C3r
a_..__._.....---- , r..__,: ._, W.=.,... .. '... s: a..,_ , :.-..,_.-- c.:.,,__.___'--,+.....___ s ...=.."— __."-"", . ca i-. C. L Q.._ _ L.

J
r_.... s, ._ c _.._.—_.. t-- .. .—_..,...,._ ....,_,,. . y.
m.._,._
ir..
t _
1: ----_ _ 1 '' 5 i_ -=}' W2P I
T
Y.M y
l
ly'._...,....._._..___............ y.._..,......__ W.-_.._.._.... jsl 5 I
i. i. i ' i 03 .; v
IA3P............. ...,;,.:
z__;'.-'-- 1.....- _ r..._
A ` a - - i
T '
r-} ? 40., i 7..•}-_ (,",.,. i ,? L l_J _ J L_ J L,\
I I 4 i a l
e
I
i _ __r_ _ ___ , Q
1 g
C `"
i
r- r- rp y' C T
ca l_J L J l J F,,,. TRI/ YI 1 Y TR C.T
o:. k,_
k .._: . _:. . . ,..:. . _'
v. _.... ._-_.. . v s_ :..
r.T.._ ,;___'....., L z. W a____,: _.:;_ y_ -___ _ r. __ s
TRINITY STREET r-, r-, r-,
j
i II,,_,' 1 t/ a
k
n ,
y
I
R-..— .«
p
s n _
L_• L_= L
s
ar
y
i.

I._... n C,,,
y 4.., h lY_ ;
k C i
1 t''
F
r r { T[ t
s, i i L J L J L} i' `
t
f},..; ) I
v__ _ _ _.,, Li _-_ _
y t __ _ w__ __- _ B w: l
v i ,._
C I
7 t .- ` - ,", 9 c, .' I Rg . 4P ` ,- j:..-_
R ._.. , ;:;.
i
I . c - U s; z', E
4 ti. 04P (_ : ,." k,., 1- _ __. _._ ._ z_. _ .... .._ _. E __. r z _.._._ +. a ___'. U s , R = ` i BP mA6: 0a1 q;.,.^.= 1- .
w, _ _ II } r._G 1 ---,— _,
J
1°, ?- . 7" s ,; f
I b2P; r' —=-_------------ - ----=----- ---=- ` - C-=`----"— m

R/ W W ---- R W
t,
i -- APS+ 02P 04P,,
R/ W
I ,?, I R/ W
Ya 3
f'
1 1''' } Yt_ i _ u"u• ' I I I I I I
3 W L1
I I hI, J \ C f
4 '-- F-- ---- t— r- r++—itt-' , '' d '
x
n
E a aPs m P. sR i i i t i I
x f
i i i i i Ei' f , r i i i i i( 5, 3 F,,,
1 k--' I I I I I h° i il
z
I 1° I I I I I I I "
141 I I I G! ]
I I I I I I i) m
I LIJ IJ !
k i 4tl y
I
w ^ t; m
J
F
j FiI w
W
j p v
icl
F— d=
1 t : CL
i)
I E
EE,
l III Ix ' Z
m
f i) N
I 1 I
a
i 1;,
14Q TO '.. LRossw,vx ` ; e-2
r—(—' r
REMOVIIVG SIGNAL AND LIGHTING oR c wu. s. E:

II LJ LJ r E
j R ET T ANd TRIN T 7" m 20'
I. i-- DATE. 05- 67- 2023
DESIGN SPEED = 30MPH EXISTING)
sHe r z oF a

APPROVED
Packet Pg. 641 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation 9 k
W
INSTALL CALIRANS DEPARTMENT FURNISHED TYPE 332LS CONiROLLER ASSfMBLY ON EXIS7ING FdUNpATIdN.

INSTALL GAITRANS DEPARTMENT FURNISNED 1X- 88S CABINET ANd B8S COMPONENTS 4N LEFT SIRE 332LS CA81NE1; FtJRNISH AND INSTALL 4 8BS BATTERIES. FRONT DOOR OF ASSEMBLY SHAU. FACE N£ ST. DESIGN SPEED = 30MPH I 02 t
7 8P 08P 08p z
t_.. . r_.... o
a
2 fNSTAIl. S1l- 9- T t64 MOUNTING 20` HEfGNT FRQM SIDEWALK. i I ; 06P 1 t . a F>
5 ( 02R 4
B
sb4 AS 4 8
I
r—
6J2G & 12U f; l j I
04P qp 3 1 OLC' B
3 PRQTECT IN PIACE EXI517NG TYPE III- AF SERVIGE EQUIPMENT ENCLf7SURE« t3 r r- rii ;
4 INSTALL 3"X6° MODIFIED TYPE D LOOP OETECTOR« SEE DET L G SHEET E- 4. PI L J L J I Za z kl 14t1" T0
ii
a SEE DETAJLS H AND B, SFIEET E- 4 FOR TYPE QjA LOOP SPUGING AND CONFl6URA110N, i CROSSWALK ii p 5 PROTECiED/ PERMI3SIVE FLASHING YELLOW ARROW OPERATION I EXIST 2" C. 2 DLG,
i
i
Gal rans t C} 2, Eneroachment rmits tJf ice
7 NSTALL NEW 30°SMA ENSTALL 7 3GNAC ON P TENQN. RL SNS 8Y STRAP- AND- SADD E METHQD. i$ p i PC4 d5 C EP"PE
P-- -- i; ; Perrrlit# r 0223-( V- 345 W o s
a
o INS7ALL 12" 3- SECIIQN 81CYCLE SIGNAL NEAd. SEE DETAIL ON THIS SHEET. I t il p g; g 3 o a m
rI t
t o e:{ Inly plans stainped with tMis apprcaval ;``
3 INSTALL VIDEO CAMERA &' FROM END ( SMA, SEE NElY P4LE VIWS CAMERA INSTALLAl1QN, DETAIL E SHEET E- 4. v o I ii BNSTAtI SNS BY S1RAP- RND- SAdDLE METH4D.
i
i i PL
Q R,.
sh l! be valid itar perinit ccanstructic n r ark, o o
f
f ll 3
1Q INSTALL NQ RIGHT IURN 4N RED LED AGTIVAIED 6LANK- OUT SIGN ( R3- 1). I I G ;
I fl Hc e
11 RELQCAIE 06P APS. il i iI I Q Q Y.& or*" { "y I ti c` ' 2 VIDEO CAMERA APPROXIMATEIY 6' FROM ENd QF SMA. I i Ii INSTl1ll EXIST VIDEQ CABI. E THROUGH WATERPROOF CORD GRIP.

PL I t
I ii i O O G. B.
a, _
73 MaDIF1ED N- 4- Y, SEE DETAII F QN SNEET E- 4. v *-
a
3ls a
P
iii '
rn rn - '' i w
iii iii ai a
I # j; DEI'A.. C 4
z
i i i i i i1 ;-, C ', No & cAt. w
1 . L_ J
1 p
r
d Al$ f 2P ta& f e
w Q
3 SEE. DEfAI( 8
F I I I I I :
r n---
Y v f
I, W \ I, I I I .., -. J a a lo.
o Q
a
J IS SH ET} _., I I I I , I ti .

C J G I I I I I I _ t'1--=:...-ti-' '"'" , t -. i
i
R w
I R w
h '.-
L-I-` CU
p o ``' _' ._ r•:_r=R=-'--= I__ _ __.(__-- ___ _,-- ._.._,.____ . W:—---- _ ';—_ 1.' i
05 W2 f; ii t
Ll °', F 2
i t J{. sy" - _ C7 ___ __. ._.. W l3._='-= r E s .--._ _-.=. -....'.. A1 . i.,_ 1 . k,._ ,. _.... .__.. ._...-_ _ Ci v.._....'+ t_ 1- _..__. s_ _ -_—_ __ 1-- - _ i I eP w_.__ _ _____ cr _._ _.._ _ n,
sc
NEyV TRINffY sTREEI` STRIPiNG EXIST 2 C 2 DLC SIC
e a ~ s SEE Cft`f OF REODING PI.ANS j . , 8J6U 5
TYf').,,„
m..:,.,,.,.:;,.., w,
1! 3 ss} ts;s)
va, m n , 1 "
u... j TR' Q
0 TRINITY STREET
7J5u J
su REET
a.,..,.,,, n ., - W r_ g. . ...
a',,.

R 1—. T .,
a. , a u,,,.,„„., m,,: w.,.,. m., Wa.,..: ,.,.,..,.::,:.,,.,. :,,.. m.,,.a..,,..,,.," p" 4 6u i i i ^ V
L.-, - L
i.

T u. n .,.
q. y,•.,„.. ,,,,
a b. k
rm,. .,,,..,+ ,:,..: '
5;',,....,,. w.,.,...,...,.:, rtw n.,. u a. 0. A A 9 A 3„ r" S d t.,`h k. 6 A 9., s k d, ss. ara,. n a!' i. t
m A A 5 S R
P 4
ww, m,... n.,.+ o .... .: re,.... e. e . , @& A A .
a.
x. M
m.. w w. v, w ,
s m
a •' ro^ r ....._ — i ..._. _.,_>.
r
t0 Y J8 Q
s`--
m - -
t -

9. OLC _.
sQL I
v
i
c __
a,`
E
k i __ -
V
e e
G;, B 01
7- +
9 a 4 _

7. 1i ll 2
f
y-- -_ m
w i W , R/ w k, ti! r
m7 ; R"' i i _ , 3 SEE AEfAIL A,,,
APS ts2P, 04P+ h' 3' W ' CL i G ,, i r, ri n .

J MIS SHEET} J ilt_ I I I I I I
t U 30' l d I L__---- ----- :
t+- 1-,-—.,, I ` I
t I I I I f( II, 1-' i'"`- 2P
J 1 , 24' X24"' BLANK
1I I I I '
Q ' OUT SIGN WITH x
y y
11 s r- I I I 1 I E h ` i'^ t
I +' ' NDICATION
iURN
o
CJ1 1 Le1 1 V li ff '! C L_ J
j( G
I
1 Z
r
4' LJJ r_
I I I I 1 I( ii, LI ( I N
Ef r ,. f I I I I I i i: '
BC M 08( c
Q
v
a }
1 Q„" Oy ' I I I I I I I 1)
t..

I Ej `
1-
o
4 4^., t"' '
t! N u!
L
Ii " r7' T3; e
m
c: a,. FS o .

Y ri
N N
1 I[ . i r
a
J8U
03 W N
I( i ; f'j
06P
m
i
n/F`
o
ia,. e ta Ei
ii
W W Z
4LC B z: a II 08,;', A
n
c e I tL
Exisr 2' c, 2 2c---' ----- ' i_'i
aP ms
I
j
i t/, tt .,
sp t If ;
li`I
li li, '
s
08 A
CAITRlWS ID No. Q26273D016957 1
I
I(
12Q 240V. 10, 3W REu 1 \ "',* { e'y `
1 j i' ' EXIS7 2"C, 2 DLC V
z
m
IXIS7' 2 G, 1 8. 2 6, t & G
r / j'"
R61- 5( CA)
a \ > t
NO SCAlE
ti
2G. 2 DLG, 2 STC- 1' a I I
yy3,
z
i y1
k'
3 '
m
o
k; APS @4P, taBP ) °---•
I 140' TO k `
I
I CROSSWALK I i ij i E- 3
o scatE i NQ scA MQDIFY SIGNA ANd LIGFITING oR sc. E:

I(} MAR r9.GT w7. 1 lYNL! TR AY' T 1 . 7 i
9"=: 2Q'
N
I ziu 2lzl r
1 I +-- --- OATEs 05- 0t- 2023
DESIGN SPEEd 3 MPH r'
sNEET a oF a

APPROVED
Packet Pg. 642 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation N
P AND E4UIPMENT SGHEDULE GONDUGTQR AND GONDUIT SGHEDULE PEDESTRIAN STANaARD VEHICLE SIGNALS APS SIGNALS p GONpUGTOR DESIGNATIQN GONOUIT SIZE AND RUN NUMBER z

SMA MA LUMINAIRE SIGNS SPEGIAL REQUIREMENTS
J^
o
NC>. NPE Fl.} 0 MQUNIING SE MQUNTING 0 ARRQW
r^ ,
r „
n n n n
Q
3 AWG SI2E POLE 11 c? L.3. L 5 L. ts c' L8 i s c1g
PHASE 0
t? R TYPE GRCUIT
3_ 3" C 4• " o4c e nr- r C 3" G 2" C 3" G 3" C 4" C 3" G 2" C i
N gp ( AiOD) 4P SP- 7= T
72GSC 3. 4P OLG 6
t zo z
OLC 8
vEH- PED) NRTB( JS t
Q
3 a 8P y y o 0
3 8 1Q- 3- 10d 30° 12' 8 8P SP- 1- T
AY 5:6P a 4
1 1 1
8 SV- 1- T
iT R61- 5{ CA) 6P. 8P _ 7+ 1 + 1 : + t
w
2;5. 2P a
1 7 1 t w ca
c t- 8 5 N- 7- T 6F SP- 1- CS 6 P. SP "'— J mz
w o.
5 MAS- 4C 2P.BP ei 2 2 2
z°' m c°
df 26- 4- 100 4Q' 12' 2 MAS 2P SP- 1- T
ROAQWAY TRINITY 7,SP 1 1 1 1 1 V o
7 Riq- 27o fi o
G Z 5-- T

4. 7. 4P, QlC B • 1+ it i+t t+
e; F8A POST 2P. 8P ""— NRTBQS 9>
W IM
f?, 1- 8 T N- 1- T 8R SP- 1- GS 2P. 4P h 2 2
y .. F

1. 2P J
1 1 1
4 FApS 1.&, 6P y a: ,
w
4 SV- 1- T RdApWAY MARKEf 3GSC
a3"
3fs aa
e
go 19- 3- 1Q0 30" 12'
OLC 8
4P SP- 1- T
1 R61- 5(CA' p'
P 4P eks 2 2 2
TOTAL 12f3 G4N0UCTQR CABLES + 3 2 1
r+ 2+
2 4 2 °' W
8 8 STREET UGHTING 2 2 2 2 2 2 2
ti z
hs P8A POST 2R,4P _ CQNTROLIER PQWER 2 4 W 0
CAMERA 02.m9 1 1 1 t i
Q c'-i
i "' g t 1' V- 1- T 2P SP- t- T
GABLE 03. 8 y f W ;'
7 MAS- 4C o aa a
RG- 59 fU 04. 7 1 1 1 1
ji 26A- 4- 100 4Q' 15' 6 MAS 6P SP- 1- T

RDA WAY
R10N27a 18/ SC} b1. t 6 1 1 1--
8 SV- 1- T
TOTAL CAMERA C,48LES 3+ 1 9+ 1 1 1 1 1 2
ok) PBA FOST 4P, 6P __, APS CABLE 1 2 1 1 7 2
W
01 1 1 i
a,
m,,,,
m.

N ALI. E( UIPMENT IS EXISTING UNLESS NOTEd QTHERWISE.

Ca krans[ C 2, Encroachment Permies C fFice 2 4 4 4
Z
PM, S a CCEP fE}
245C24" BLAtJK 3 t t 1 t t

2. NRTBOS = NQ- RIGMT- TURN- BLANK- OUT SIGN. Q O.

OU7 SIGN WITH m4 1
Pe mit#: 223RNS 7-€} 345 6 -— NO- RI6HT- NRN Q W
DLC 05 9 USE POLE PLATE, SEE CAI. TRANS STD PLRN SHEET ES- 4E FOR DETRIL. TYR. INDICATION 1 1 W t ate: 4/ Z023
06 4 2 4 t!)
tVs te: Clnly pCans s amped with# his approval
7 1
sh Cl be valid for permit eonstruction vvork.
8 t t i t t
TYP:

L
OLC 8 2 1 1 1 O
70TAL D C CABLES 14t2 5 7 2 2 1 5+ 1 5+ 1 U v
J
VIVDS
N E- A PERGENT GO DUIT FILLED 31 24% 23% 16 92 17 21 78%' 32 12% AS EMBRY 1° o
NOTES: n.

T

1. Min} A L CONDUGTORSJCABLES ARE EXISTING UNLESS Nt TEQ OTHERWISE.v

SIGNAL MAST ARM
Mt?UNTING BRAGKET NO SGAt. E

2. 7 OR + 1 = NEW CONCtUCTbRSjCA8LE5.

N X J
N1t ON STRAP ( Typ) 3. EXISTBNG 4 3 QLG 316U CABLE WILI BE ASSIGNED TO NEW 8 DLG.

Q

4. EXISTI N G 4 D L C 41 6L C ABLE WI L B E A SSIGNED TQ NEW 7 DLC:
61 j64°' STAINLES3 5. NRTBdS = NO- RIGHT- 7URN- BLANK- OUT SIGN. SIGN WIL USE ONE Q = W
STEEL BANDS OF THE 12CSC CONDUCTQRS. 7,°' 15" 13: 5"
61/ 64" STAINLESS MAST ARM W m
O S7EEL BANDS Y Q
MANUFACTl1RER° S
COURLBNGj WATERTIGHT, HYBRIQ CA6LE 24, 51 22: 5" TYPE D 1"
m I1'" ¢ ( Max J
6" DRIP LOOP
5 TURNS) TYPE A TYFE A W W p COUPUNG, -"

WATERIIGHT W C
2 1" fb ( Max}
L8
J 25"
25° UMIT INE p„
aRs ooR
TYPE D A( TYPE A tJOP EI VA110IV 8E 11t IV A-A
TOR; Y
NOTES: PULL 80X N 1. MOUNT CAMERA ASSEMBLY USING CLAMPING OEVICES: Q

22. 5" 24. 5" u,

2. EXACT MOUNTING LOCATIQN OF GRMERA ASSEMBLY AND BRACKE7 WILL 8E APPROVEd BY ENGINEER IN THE FfE D. SPl10E ( Typ) NO SCALE

3. DRILL HYBRID CABLE ENTRANCES QN SIGNAL POLE FOR WEATHERIIGHT CGtUPUNG AS REQUIRED. o Q

4. FORM DRIP LQOP WITH HYBRID CABLE AT THE ENTRANGE rNTO SIGNA MAST AaM, L DIAG AM Q F S. RUN A SINGI. E HYBRId CAB E CONTINOUSLY FROM THE GAMERA TO THE GCINTRQLLER GABINET. SPLIGES ARE NQT A LOWED: 3, g" 15"' 7, 5" Na sca Mt DIFY SIGNAL AND LIGHTING
E
C T/. E- PC I_E YIM[' CA 1 NSTALI. A'I1C) N C) Ei'AL Q- 1YPE D LQQP ft OD) ORIGIt4AL SGAL€;
No scA No sc,r MARKET ST AND TRINITY ST NONE
OATE:. OS- 01- 2023
SHEET d OF 4

APPROVED
Packet Pg. 643 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation A
WN
J- U
A z
B
r
B -'
A , m
J
g
A
A
a . ' p Caltrans Dt 2, Encrca hment Permits t fFice o 0 F
a 1. 5 EPT"E
PRINCE ST g 4 o
y
Permit#: 223- = 0345
W A
B
f
C ate: j29J Q23
MVote: t3nly plans stamp d with this pproval
o W
sh li be valid f r p
r t canstruction wFc rk. 8 B
2 x
RtN` S ER
K
P
A - B
N
OZ a.
4p
g A
A
p
G
r
B
B A
A

A B A B
W
B A
N,..

P, S Q a e".. a
t1
m W
q J
n—
a
o a
a
n
ErrERs ( n'P) u'
n A W
T T J T B ' F p

GITY PRQVIDED) B
C
rrP. oF z THIS PRC3JECT HAS BEEN MADE rE s t--
y, PQSSI LE Y FINA C1 G F n> C U U
CALiF R IA CLI ATE m
F P
INVEST ENTS a ' B

FUNDED THROUGH THE GREENHOUSE GAS REDUCTIQN F'UND)
4 A 9 A t
a'
AFFORDABLE HOUSING AND SUSTAINABLE COMMUNI7IES PRO RAM us THRQUGH THE STRATEGIC GRQWfH COUNCIL AND THE CALIFQRNIA F– a
DEP, 4RTMENT OF HOUSING AND COMMUNOTY DEVELOPMENT W a
CQNTRACTQRt CONSTRUCTION CQ. TEL. N0. ##– ###
CONSTRUCTIQN MAM1iAGER NICK' VISCONTI TEL. N0. 2 5- 4170 m 2" LEfTERS p"
OTE:
1} EXACT LQCRTIQN T0 BE DEfERMINED IN THE C 1ySTRUCTIQN AREA S1GNS ( ST TI0 A Y U TE ) FIELD BY THE PRdJECT ENGINEER W
TYPE COQE PANEL 512E SIGN MESSAGE NUM@ER ANp SIZE QF EACH U
2) SIGN PANEL SHALL 8E 3J4" EXTERIOR GRADE POSTS PER SIGN PLYWOOD OR GITY APPROVED EQUAL Q W20- 1 38" X 36" RQAD WdRK AHEAD 7- 4" g" 2t m i3) SRACE BEIWEEN UNES AS INDICATED g Ggp- 36' X 18" E` Z
4) GUT V1NYL BUACK LEfTERING WITH A BIACK EDGE
o END ROAD WQRK 1- 4" k 4" 21 t/a Q
BOAROER ON WHI7E BACKGRdUND O x 4 FUNDING SIGN 2_ 4» x ^ r-' 5) MOUNT SIGN QN 2- 4"X8" WOO P05TS ROST LENGTHS ARE APPROXIMATE ONLY. POST SHOULD NQT BE PRECUT Z
F RCIJEC?' Ft1NDING SIGPI ror;a 4a Q
EXACT LaGATION Td BE DETERMINED IN NOTES: a

THE FIELD BY THE PRQJEGT ENGINEER
t. LOCATI6N5 OF GONSTRUCTION AREA SIGNS SHOWN ARE APPROXIMATE A- 1 ONIY. EXAGT LOCATIONS SHALL BE DEfERMiNED BY 7HE ENGINEER IN THE FIELO. 4RIGINAp. SCALE:

REDUCED NQNE

2. ALL SIGNS SHALL HAVE 7- FT VERTICAL C EARANGE TO BOITOM OF PLANS + uNE zoza
SIGN PANEL.

SHEE7 27 OF 28

APPROVED
Packet Pg. 644 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation 1 .
c c. . ac T r
9,
1;. 1 55t@R#
S 1, C.tPtSt ds. t5r'tSFk C' t CCS3+ MaX' R33G7' 90NSi C,} U iF16 49E7^ d7` S. h"f*LfCA& l.fFt} R; ld. 3"dE CkrSGt2ViGE; CQtlS7P
d TKtAd. a: TfB C.iBY i#
2 uYA60t} 4: Lk SGRiP740Pd
54 N CCA
df. e„# itssSdaocvtE l, Cr anrrn rcl; 1, rod i r1a)
18ti
i95S iP E `+
ThnOmm*,e, ao, Xacn.a sat r: Gµvda mr+usryuYnp.., tdtsare tlPn,rr. S,yY dRaer npik:":v. kimcC, nritrruIan' 3tnr arv A' C07. Rti fj. 520, 6{t.3,.^ t, 522. L' d... 5 : » iC ... d
C"
t JKP F#aE
A
pusi u7 3Yt,
d wtt,.' tt tu+ i Oc*
0,{ . T4+ a+raGveE! ar+
s rn' 7u.+
i vu+id i C,. n{
ersartHv rwtsM? wn} Ncanauhri raw
t rarc.; adwYm n#a°,: a+,
5 AF tI{ 9':
t ig' d}i' 64p.

GXtb..77i G' r':.5 k.. cnsa;
e1"
Azmt icr.. nc* v.
a rar5e ra m&,tlrs ratwt mt+v+a¢+
4 n ntad 4tm tau l.5 1." w+ iawrpnmx. ry t;,iPyzmdr•,.-.•..-•,.-. .' daura i1'ctlmdt6M^ fi. lp$1ik4!{ C' 5id.: G24. 571.. 5, rmn S, Lysr a' 4ai+ yrcreEii. rtai33'r. o w4{ a. ua n. nr arrclnryu^oc ronwjiaes{ a.L` rua e.,:um¢ mxi inaan' ta ni+c 6aa. 622 p.,..

GRad7[w
f
k tSF C"R1' P, Ei!i fi tUa wmira a";a roamua ata rraqu« Arnt+ aarumamttx= tit,ca+as,rcr Fu» acrvii rani+rBEusdn* aoua;; ttant ra 1":.
1„ C, f1. 74.'!. 1' u{ r'&+:..' 1d cuP:
7 iWsj1}
Y laF @r#fii$ llQuftStlRtt''} k' A31 a1tt 4itflAs% tN+dR.^.&!' qnsAa' UrR41v1Mfin? W"I R 241Ri? Cir§QFlE{ 9(v i`7&ld+. S. JSO 2-
Yf 1- e/
A k r
a,`
e A64': a' PN) tl. 9L" k.'.#'CYiC' PS AT t.5i' ne
i r3sara aw nac+ asanwlcmmuae+r mhmlw, ars.t9<.9asralnant ocaa, osnn acy an ac ri umr. rnne#n,oa w, t+mya.a US2ffiiri8`' 2,+:.. 14SYu' 3S d4AiiC S b' I9 79CAC`. n n; JwN1( ia DkiF tr..4q, sGh lN7d
84% t; Gwr' ntaEnStctt' v++ci+ ytbx+ t3nromA^ afrar• Car M dd N; Pstlbae+ an 4ilryuat+ ttpi meAa v+arwf r,ra,wssizc 6 2-
3 t Y-,$4r'
t 84 dR
Q3
fa£} tS. td]
i 3t1 Sw#
t Ia OtD` jjCSE L4id 1d7 h! a"
cr u,u rur+i C» i+ra4 sa w; iuu. taaneRaetowatiia. aanrlh a,anr.+,t7er wyaaHvMuiC 1'Af f,<Na cwtt i75- 2f ^2& R,
i
3T Sf ti«c't G, U£ qkTY 7FtA" f'f ty3' i1ttS. teuts+, caua M, i +s, rrc its,. a: 3n, mr a. putj,+ m!{#+urtnisrpviaa a+tlArmve4katlbVitmewa9ausrrdas» toi*,r. Ara' r,uu iawUa` ..' ,:FG.

I
y46.{ C'#Gt YFlkt9[
R 9f 4R 516 f' dkA9F F. €i' c165 tt?' dE1C' SL
d tiitpd qf?«C# 2E+K'
A
f WF S£F+' mm+, ttisa t+wni 2ftraA au+t€xxtQuc3n+ avh
t Pwmr,p nitn. mw n' Eatk? ttii Vas tx,dUL YASFr a; ua4t uVtu v: ndttd arnd ltSEx' i- P h! E7:

C5 6d CN3' EC3
i fM,? ibC i3i Q3 G.'F 8T 7'H£ inGl adAYmu tar, srriurc* k ra .7'
l Y.d4Y'
Q 6N- 6C N.'i31# S°.%C{ HZEdP iT7S t%E i tt C. n""+`ut°+ y rnc:^ uth. t`mU3 rav. hP9atnhA ticas: sk k' Em!'. drr, i.ita r:,dnr y,Tkw! kt{xsr'. r^,n n+ UreH+ nan9r. w*+< nty, it dC G4'
C 5i. k&T
0 ttCk' R"eCia'
i dt T#3'.
iE1' 8' F"G QrifFb` tkr.+ yy+.zlGnp a+°ttw iw rna s . w „'+ c* yo, Al. 1i: 6'+ 3X( 3tf4f, t5£ 9Y,' 24..'. a."SS 4Kd i#tiSs' E MYfEt 9.A'P, 21` L4" tk# S E3:€. fi v^ Ett TC1 YiiE A4sca±
u a#x'+ta,+ r" u# avfVC'. ne krata. AG; atGtWHo9r, ur#vrwa sniti7b+ PJC+".+ryyr} 7 ar r^„uad.[' i:,dsrm5a7i
a19tlCVf 4:'.' h` S1 U21E, ti
5 C5itl4iC l'If'.:i Ahiti af idu 9wroi, aa4u w*kfsanuA, dit+C; ia c: mrswa+ lmu tWutl Att nM tLlnlrwnln+ kn t3 ma,rtmca, rat`a¢su+tc wtan{ 1. 1yGht. 76N
C
S Ati $
ft: d q7¢ Cdd+tt.13' 4F9A.# T:tk4,u+ r...iu, cYwik# i&d 4ta: . SF Ci£:Et37C(} 6i2: 51d. o- 25t+ 8uvrsk; n+S;, ue3nrewr ki tl# un+ a aruitn4" 4+sn( ticw° uma" tayayO Wya al Ca,& r+*+ haiiC+€+ d. f"k ust laSa NFGtyp S`a 4t{ k.. tp 7ts i5.'
a ira7ac aa9 . r . t s 4# a v u,n+,n, u, xi is,
a w+ mR,, s,w so-, az d.3.
diGA £ Ff 94' d'}'¢E kiY J4F 4. ti 3i f ' Su
e UuveW, t7C. ya. ta+ edi qaaY3' ticm
c xn+* wcd> qiSmeem. kuWn wN, rpttvls rnatmw" ee itrYNin ttaqrp atapeddvl.ue 1; 7Gv rc&d a+v S, irt t4# ItSda'
I S. z,$ i[5. Atlr:
a Sa, a§t•;a ekby tEtta N# 1rnmina9i anipintN kKe. LEU
CU tA^ ik" AU STR Efi I.}: tAY t1S" S: T. 65 5.55' vS5'', 1#4. 3.- t'} P q` SP9CAi. f. Ck J4FtSP7CSE E74: 5.A5
4 SCRIIB£ t)IN 1 1 Tx+ Cla4wMtn+' imw.: maa; wbtl7rt zG.rdi Us. ilaHs,Ushar4Gtna 9'.5 Wu' atR.aarrd¢.nvuuu. R!"llw Nrw+ma ye.n, a rku* es SYANik
1$?I. UdtEl! pM: IW't:.Sti7.
0 iNE
C RLA
S t+51' SYN:.Y'Kt1 lC
I k" F+YNi StCFp Nl DiE. xaeri„ avr, Cu:aanw' arF^at+w. uon r+yrc e wM alta maala4' a+ H an. YrS', Spli9.

Ikd`'. lN3 t#1 31t
3 Sk` G: 4
r. nro.tt rum4 rhaH tr 10- rtly tv ncn mcma ti+xn 8=94i* eao, tre.wam rCa cu cta u5wh t+ usre rn! t+#• r 7u f.4ur4hrc+ u"IHNat19* kCbit: nratlYFt.#iL3 raaAirc+ u9'!tN# t#pii 91 cn4±:,Ja t§ktai+ bALi iC^N, . . .. . Eli9aYYNG f°QlF; Wf Pi5Ell Si7
a AKr, cr ik4tranlvrRr+L.^.*r, lui' lmt+ Pthor
Gl et. mkv r,r bs4ra« apvtsK" s,i„
Sf$ Qt ^ 4flf[# RC6, fC'.

P SI"
t 1' @ " ta
h mr3 etoarwaap+
c wu+vu Q& uVlwiroaxc tSn Euaat# urtwu uav,+ c, Eturm„i t AMr wArmma ovae: i.tpnr¢, trm"` 13+ naansd3rPap3lund
r arMvdxr vka( td4ya sHrtn vta+1 tf
ti£ P1: A1 t,fii'
F UI,, Wj ftt Sg> C45t.
3 1 i'
d ii SH fii7Hi k4STp7. 4; . . . i, t7 s; ta r4eds an!
w rsS t+vuesss, e*nv n, u, en ui++..,,. ua r.u, wxatxea ta, m...=n=+ s ri aic ratw
asw sn r+c, e• R. kS.
b'
C PoY 1 Rbs+ ti.v+,sr
u xcNatt rs;€r urwl aft; ttmikvv ic ar+ u. tattrs,;i,su« xrv=:a mnnarawCian t.nNt srruN* ttwauwat3t;rr.y fdb( U4S( i'A1E MC++9i1F.? EXd. UUEUi 9•
r a6 i.Pt(:SrtqF ltam xw,.sSniu aes. ra{ Ni:v«' N) dmp; wiaraaA+ rtt«c43w tszaiEuuuas;.z`uw: e+a,rd ius a^pnrUsan dF#k .ALA. t. JXE: 2F,.
x lete, m.
uci+.ao.
r ht
a rttm,
w skm k.wG+,+ cnrtasuur
suWtrm r++' r+ y eana aaa ur a+rcauan s,.rw+ tnem m'.y/ YtfKt
4 7CAt' EtdT P. M ..
c}
mc; tkattanx. h7 5nrd h'+Ne+
n kWiiitnr cWN tsnmtrywm' tl
n x, ens S# NcXk' xu Gci: tih. s.-
7 fidptac+ Yn§+rt erF er: unarx al ftiw v:daar psr,+W cai3th Atw ta fes' aS.vl mer# sF nr, nd+tl icai 51saR ha thar nrs 3k+ ry AI N. i_' S( f7C' i`UGFi7S( .

E 1k" I.EY, CL4}SlED tl
xr L} otwdaF+% r.4:r Atl..+''
f uGNY C{6U: i4RS( PC6td' detli wiEO£ iG. UBE' IF) it, Rrarwv ta u. rsttatt rccaiu+ r«trn. aa•»:a xa u, w: m. yd+ adp uvdarmt a anmeana+ wrar a:&' a Arvar.a.w: aa;
y V'..

E7ti57` IASG, 19 PAUhQ' JdNit TRANS€
O At t _. t r• uR: tau. xEa r»nd rFw++ie nam REU
T6 fltRt S$tk
d Lt
1 51A4 n
ri uxa1 carvs, 1+ ma: 5,
f V}m rv+. art t.++a w, aew: rtnwa gw tow jc nxnix Xt4 i. rr dtra sy 65, L b# dGMNY i:1C17 Sf'{, 1C. E"a 6
ia1x,'(4*trsn£ 9' 9r..r+vJt wt nt wmJattrwutta YwYfsculy+.duw nwki+ ei{fW63' N+"IjA+'+ 4t G4ron. ttalMCAcntw.%°, drt;dy w
dLL# 4t Y' RfFIY SfF€ E"'
f
I Hf5 Iso
4by; rDSNtae Wrttr usssu; Fv ttv Y,:
1 Eki. iY+dii16% PAdM# tfUNY'"INAki" si't d{ 4XER -. 2y1 1ftuP+ roer urN 1r43afla riA, YpemAtlaiztk+Vxsn ana rt+rawanrt mticr<+n+f t{ ceW^:+ 4ia[§ 5z#€ xa:

N 6Fyh.. i1,
t
Cb..
v rrwp si vua±+ wus risua, am;.{wrerYaArSctar.. xl+a. dMimo,. swa; yµn;:
aka.
v. nuqtzrte4tbarvi
h rv!AatY: muww, 2riic.

J r3ytlYtl
X1
k t.F
lt. E— ti;t {:' 7a7{
N STAdit7AFiU Stf
tYi.H. 7t tIR - C1rr1 4pPr% Y: uwWm, r»R RSnawrst arrct 7Pt+ie ta3l( 4tzii' wAac crtd dt#rMwY9, turaafuNiEmp&' eu,mC+io c' MR rS snzc. fi Pt7lE hltlfEQ STR
Yt1G} fC ts5a, Cts.+ rtra!".."ts. hmiir. rrrpanaub
4VclNmtt t1^.uat tam<{:,tust t7au marytt uu ttsst hoatkJ{;,[ mraam; 4vwanamva. t.t.

EN1STtliGSYREE1LICrft' i0N trnaesmtmuim+
t
rst:ricaMa;.' sa+
n wat4. teAMa. v#a.pxy+ anm t+a+9 atn ts
r p, F'n as tf. ar uuntrl. ti csndutYe sa waa aa+
amt tCk x'ux; rwri wana me,i=h5# N+ M' uw acf ac++a uldtr Ar..r,apne pawrire,PtYAft' w; ylGwN. 7 ntcr: ifu¢ rnas,tu+ art rx*a itmusathvra[: ttmm t#arh: se w sae¢
nr atwcv+, r• ai4„ n:ar,
V a+n antn. ry rcna.#Au}++ If31hJ:
nSfd tflfN0 7Y{ 1l4Nd* Yl} tG1' LAHtMI# IAYAatiY{+:W,d4$QGf 9M1lfAS 9t U"iV APJhd A. 4fq0 i+RF' iIIY` k°. fik7d 3 QDttSt' tdi w`t iFtG
7dx cl,.
r
7 n ni+ cnpc pdmiirryr rLe+ u,+c' ins metnr, a h'
iuW6iytkss nu#srzc<.a.' tia1,:+7rw:
w rclm aiii hnpu&c7 pN;+ wiau6al< r.: vtaclwtP4ntt'!! i#:Ppv: id trt+6tiiec. nccti,.

Pcirr8r3%
aa4cvA,;+ sm:wwtiarL+
e n3e, rir+ td{y"nnrn- tnnnyiCx rctikitureti tann GFl+ y1 CNnY; k.retu rwrmt ot, a5rtv' 3Htnw*4.yr
e t EXiSTtwG
2 C?9X vo
I
r'atr ctl+ a, apta.1 tn n,y u,=,netr d rarea:.
a xnk4rwm kwa ataa+nsaMak at}« c:tictlts Y5e4r V,:trF. IWA"l krttffe4u# anwts4 G' raiirnkt++ iGtt i9C s4nev. Saat e. isA tay F3€:tl.. . . f;7
EXi5f1NC 3X5& Q%I.,._" t" t t
a rr.* cr: ac[ w, rr,t,i,:a, rnf.:: atea ne; t'i Mur+ ccc v r unuu t.,tu. x. ram a,ia t; Eat4Siltdt3 to FUt.[-#dtNYWi'
o cuznEcw.
qe..
vsr
nr+
ia.
n rv 7WiNSfQ7tf dER

1.`" r"{' i'' i'".
u t" f(
Mc 5,[RVICG LATEIUI flud ting
Gtactne iteutty '€..?;..,. oar_ A „
r t„+;r, if cr nr nt+{
u rr; ra + wss a ai ec? iiU. JCi?
O iFl. i" e._., ,'.. F r '" ... . 4377!} B
G t{ 4.>.EXISfIdNi Y'
tli.E ftL-'t!
UE 061LY} Ft€U
PCtI DATA ftr Eialn N sun . .

ICc r+,
t'Wv. 6c, ta
Nry 4: Wtuti N[. ilass 31r*
i th NweCxaui, o.,
dtlae CA< rrrtu+
ntc YI bev}
lt5
tt&
S. IC2' aCtYttYlhPtltAk4t F5 2... . GS CCfi+ i O!/'. JjF7 f: xt

11. ix155Ca# rRiEtarni3; 9t . ... • aa CGa++" ttnldJl73 ... : HOltja+# itYtt7T.. N;y7`.. i: iSICUHithi. t17Rt5( " atM T [ 5 [; Ctt iP NJ:MJT4
i itlFiU' epi{ NiQt4
C Itrans[
02, En roachmen Permist Fice Pt 4l
5 4C EP7° E@3 Permiti#: 0223
1S- Q345 C? at,
29 2} 23 Ncste: Gnly
plans stamped with tP is apprsava( shalf be
valid for perrnit construction wcark.m,....,. r..,
a,_.., .... k,,.... w.-.,,.. ri.. w„, v., VLEi1F` SGA»
F
t s• ,
rc MF _ wo t—
o acaa eves. A. ., p
r,
r E F{ TRihIlT' 4 S.O@! 1' 1lS IFCTAL T; IFY4ITTE '" T.e_ _ M _. t r r : 7` ctt
c...,.
e t .. r ,._ _ .. i„', a
l%` .

G' v.. K•
2:.*_'_.
r.

FtEYt3tC} hlt sv: Ci
t apan vEn f Reddi 7"Fi1 11" 1' T'. k$ 1l E 1W`, A' f tr. t`"aFl' 1htCa EL C7HIC, R+#t+N. CkCER._ y .. mi Fa.;
1 6W. s w4z
a nsatyrsa F.. . e...,... _ ....._.
t,,.. .L s.: n. Ehli YNEERING f."'1 . C1 htt. cr; Fv$, ii: HE' Y' " C F

APPROVED
Packet Pg. 645 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation a
i _.. w
R
i 41 54G 9,0Y 4fITE i1 s 1'. f t 4 5ifitc'#. iGFrrS arLtitt it:C,NAJC E i:t d4wi' ooa f^-r" 5Y5..: m t
2 .' U S . sS ftf' : d.0 t. 5#1711 it} Mi P' d LQi' A ..

M. h
n at' 3
l
CUST CQ21.. SC INi4M k ti C7T' t A( d alHll+# fI- 0Yi5 ti5 d'k(. a K' i*t .. a, s, C' CNi
1 , s`: I .
t C? '{-' . Yk*' K3R RECI NiSTRLi. fS. it£ i,
Ri5£#t. f„£7St . C4NG 54"£ Mt ... t4 X7
k niac. ' I
t 7 20{ txr
r
s> ndt; .. tf+, r
Rx.. dt31
4 r eaDd" .
y
lc+6tj f a, xr. , 4, .
y5,
i x] 3 H Eii 2N •
a,.
e.. f:: 34 1 1' v ."..
q_ a`+ f'AAC p
t"" C-- L- 3`._ 4 AAC a5 k:. l
1 filS2. s '
y;
i/ 6 '
V... .. '^ ^: 4
i
f'
r., : ; whttx 1 L J ._
w
I
h
v.
fin
o
j h S o t w
E
I ; ; I I C" r
f N
ff_/ ...

E
1 t . . . . q&
t
ti` k ' i ..: . t l! r. ' ,.. , ' rd f...; ..,.*.,. f R. e
i+
c I . r. .: e ' a .

J
r.
1 r
P, j
t i a s
srP
ao t

3. a<....,
rt n
v, a e
r
w
w . a 1
t . ;: Y,^, f'q i
4a. ,,:
uuo=
4 le I ' e
G I C; `_ I ),/ a
r
i ,
u,
a' 6aG l'
7 r: ., . _... .... t..) x ..
i, . . ...
t. s,; l , .
j i
c' ;'' 1,-_ C Itrans Cr 2; Encra chment Permits t3ffice i a
s;, a , f
i. . ' w:; a" i P1. 3 EF' f`Et
I j i
1 Permit#: 022 sfVe8I3a5
1 S 5._ lztw ar.^,
i ,) F ti" Dr'' F A f QZ.

IUofiet CJnly pi ns stam sed with.this apprcaval
E ; shall be valid c r permit cc nstructic n work:
i ____.. __ ___
t
Gr t u'rt.' T c. ara
c L: ,.
s
t. _ _. a M i, _
p i r 7 f1ri -,.

N" Y4xSN
p. ,
y. "``
f I 4' 4;
w " ,
E
a i f
M
t, t,}--.
t'
WQI iK Y E t1
y
a,.. ,... 1Y.
t
iCH3: d .. ..

F. ; a
N&=}? 1
b.,.... t, ..
u....,..._.. ....,....... .......`
t.. t. Afi(' :---:__._ '"_ f a S. t3- 23R^ Cit l,' C,Jftti f.lA8Y fx}. '
3T9 -`.
a tk.

M' ;; Y l
t
hk. kl .. , ._ .. ._
1N
f y ,¢
q
e, (
i')
uk 1c
a. :
a , .::
1 i-^
M TM Yl). }' i.

C>.
5 t` .. gU f ta} E3 fs:42- GAetE SERY t I 8 ac t'( f w2 s, k Ry.` 5
a
a. - + i .....,....,,. St(} " i <
x ........: ., .., \.`
a1Q..}
1 3 9!.
a
z:
s ,... i i, e,..,' r, . Y t xe
t.{,, i.. 510s m „
a ,; . ... Prt,'i3 "' ;..,,
i}^ USH- Zl- 5 idid. Pk t45Ltl SECC IJANY Y
r r
3 x s , Si s ,
sx
r .;..,
sr
1 a}- 3axxa- tx t SEC, S- rEr a.- ca.
a.. g • >. ., ::: . „ . ..•:. 1 x,, s ... ` 4r, 3uAcr , c„ w: a.;:.>„ x, mk..» ». 7 i3 N ( fl,,, 3`. e rt . ..,..
h,.; p , ennc: . _ m __ ;. t ss nnc <<. a A . n
s x enc_ _ F- 1
e..,.,-.- t r
s.... ._ __ _ ..,,,,..__._. _ 4 y
w._
I12815 k` llk7; . . . .
d
r f f6
y&
1 6 1 N? 91a { 1}
tfosr
a.,, i :
v. i utx f x_ .
s tx a ' ti}-. a a uf u tm rr/ c' a n
t rrme I
t) f{''
p
j r i.; , '
i
f n, c: N; f
F
i
i'
r.eaa- 4-. IN. u wt 1 r a/' ama
a 6 tsC: : a
i
I t
t t '
til- xtew- u-% 1 i v/ a'r
j t1--- --
r `
r
I°1
o ` i- ruaw- u- s/ t uc uu tm w/ s a u
ti
F r'' ; f----._,____
t I- r c r- u a un w,/a'aeaa

1. .......... i 1
139j k6k5.8T» CAfiLE. 3RVtYi6hCStfttA: 6qtlY i W7E.

N
L. C"CRIC liTlL1TY PL. AiV
ec i. z^« t5 ._ _ ___
s
Mx. a.. irow aS2 ... raicrenaty, sryrt Y.v.+ ae t. w. Nt m i r 4wa..+: xrrasnx+ w hx,. i . w a.. H.aa t ws oras VERIFY SGALC ` ' k ' ' '
y BMBTY 9T.# CCIN" tRl lT,4L ST, 1 iTT 7`„ wca atc- or D e reo. n i_ { F a „
f t 1
m........___.._._ n a .._. .,__ r ; J ti 1^'= 7.. , . kiv v . v. .,... mr. _, . .,.
m......____ ,
z,.,:+: APPN[} 4ED BY: Gity Ctf R' f C1111C, 1i" F" I II1C"' a T. $ IIC t Y LlGi TII l+GI REVIStctta: w_.____.___ ccr rc r awa r -
t';:,,
ns aa7 oa ouaa 6e o.
u___,.,_._,..._____ m___
na raeec t c
tY C 1Jtili Cal1. i. d ad:
s a r oF

APPROVED
Packet Pg. 646 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation 1 r r:= is ar .:_. 4..'.
y .
1 iN+ ItY 10G4T&' d 7+A': A0. 4. Cf?tY- t{3 5i: L} GRs1S. 13 7 N'.,A. i1r tCit 3'; C 1CTf 5,. MtO kCS i
pp
I. .: . 1l. A5"s¢M',40.Y b N1Ttt f GYt.< aYe FI't ttC OC. . q
i 2 tRi51 . tS L fF S '" AY . RQ 1i 3.
d uMQ
c.arsr c t aarc u a) icr- sax sa
4 , rt a r asz cso t e s+ a. s t r ar r
i '
1 a ,. N ...
6 3 REU 5iiNJ. - F#: htAT S FT ." ttid 8' Lf 5: r! .
3' P .
f
w.
4 d`'
f,
r.__
td'3 e... . : __ : i' a vr
os rrl2s
a rzewrifiva xa catasra ac a rewnrzarrow
ti
Sf4..: e . _:... . ,,..,.<.>... .„. ,. . w:. p t......,... , .,. , . cd3' aq Elss irk Ultliik .,..
d
BiAF,# IE .
3- t{ _
3f0 i. ! .
r. . 1 510_. .. .... a . ,.
e t 3kt.

N -,.:. ,: z .,:
a ,
r e...:,.... y ' ,_...,.•-........_,.....,...... ., - S10 ao
R
p s,.,

8. E+' : i : aetf+ wmxae aa acaeew eaa svv, iacc..
15+ 4 .. iF.) a.0 ea+ rvemrrvrn. vc.
11 3't t:;
93 y
GtKiIM
M4.[ W la 8tY0RtkACfv WERM. hCCNA', RY lmq.lAIWN 0 , "'._:
ti' _ .,.' 4<.,....,<_..:. __ ¢ k+v+,u.i. t. .....-
e. c..._ ':..'
11 t 1
d.,`:a141`
k
GtAC M,... : _._:::".» , ;;
t4PB:.'...»::;._.,...
a.., ....;:;.»., [:,
z? a'a.....,.. ti
m____--:. I
ae;: w._ i._.. a... .
a-. T....---- v—_._.... i.....___.::... :,.,. ... . t..,::,...._.,. .._.. _..._.._,_.... ....:.._.,.,+ 5 s.. ._....,.»« ...._.»__`, ti3 ...._..... ...,,... v .....:...,.,.,., _ .__. ._ _...._ .... ... :. . r':,. S .": t .; r<, .- r,-- .., ,. 1... n... ...:_.... n t--- N.__... . # iz Fc< 5, . ;, 5, c n k,, q,. erta „ ...., f,, anc : _ t,. ta. a k
a _ x _ p
j:; . ,
4, k` a
e_, r>z _ . s, 4, i ,,
t.,
4 i
i. aos r c
i{z tsn i
m_» fn cri: $ E
as' I
f.Rti`
t k ` I t84af : E .
r,.€.
y
ti T 4
r' G
y _
ra, .;;
a... a.,; i 7 . .. ..._..... .. n
j
f"
v,,,;
i
I OAi} fNEi CA1 C.. AtNNdffi ROdI rJ`. CALq:& T' ACMCd
li , .

I N: tFN' W PW. k GATA
6 1. F , F
3 ., - 7 , k- ` ( •-. ( „,
4 #& d . ft' U 2b @" I 83

1. ( 2023w_ .

H213133 a9' 2 2s` ' H. 5" (...

N
f j 19& t' RCU.' Al"f .
p a ; r Rcu z+ a= ra. zoas
a,; tix, e f• 1 s xa` r, ! (
t' ii, nvr
e .- a G o' ( r u a° , a• Ianxsj
3" a _. . . w
e. H@BfF4 5ik' 2: ..•$ 4' 6" 1S I _.. _{ R U: I Att
e` f`r »+
y.:
39L`ft6, s ' 1^ a3t1'
5'
t 4tB3RK Y iEU
r . f , lB!
1 p?- a- u- apk ucc wfa• cW1- rz-€ v t aw s. ra ar
t i tsw n e r+,r i eus w/ i- xau
I J P MtS^# C A' V t. ` f.': W{ EXV BAKT .
2, .. g
f:/ 1. I T N- IYF- ` 9A R
s+c
c i",sot
t
s.
rai,.
t- runw- u- c t+ w
t t rr_
e us Z/ ti C 37 sav, vn
1 Nd W- A. uF3ltttkt t54 W
tt- s- t r t rrt r n t
1 ta- s vN
i,.
r
i„ i' AG e
y.:. t'4£U- 0i0- Pi.kf.:14' ` 1 '
2{' VR
k12tli8+ i ..,.... a e;: n, s' 3 , h,. a.:.

CIAGc.
5 ii_89kit,,:- i., 3. ti,. r 12f7iHGr.:,.... a :>. , ubv:..,.. Uv.„ a. , wt ic a, azt. -. , G; w .. ,.,,..,,, .:. J' %, a,,.,.,:- > } 3.,. ia' xu., s., ,.:...,...,,+ r ... _... ..,..--.. m ," , "
CT 3E... 1V .. .. ........
a0 46d. ti:. tS :-
3 f us... ffff _,.
t::,•, S; rGM w.." . . .: i. : 1 . „ a,,.,..-. " Ojt ._., _ s.. ,..... wa.. „ '*, ; rS6APt', . . .. . ,
r_...
t7 r
m d, •:..,.. „...., • i:! tlGk..
a ,;. r . M. , .
t
m.., _._ ,. wi- r«- an t aw} t v a'
r,
i} r c- w d t n a`,a
n, rai 7
a n
a ,., .., r: F, u, 3,. t)- ou- J- aMr;
I _ . ,._.. u, ::.`;'.,.: 4; t Srz`, ti.: + a,:v ...... t.,,. : n..<, a,_ u, u. a,, z ., s^ ..,, , a, $. z e.. , t'".. ,,_ .,, . , ...+...,.. + r... . ..... ..:, u . ..... j t ... . .. ..: .. ... .: a. . .........._,., + .. ';,..._.. t6 .. :.. r . J ... V w. j i" i tSU t- 11YAN ' 5tttYd 9Y1I: N1f2 tl
t lb taI 1 r z t vn a o/ au
t t, sia iz ti}-- u-. un w/' r
ti)- a c- a- a r a S any rs/ a•
x z r'
C i ' ... .. t` F:._ i, I HC'.## IPSI e, t' 1 t., ' .'.. 168k- EddS9:- U OtL,' STAV# 1 fi tRt Ct! CttGG-! N. U' k@` , . r- Ec, soa- a d t ax 4tenr si., woi t l- 2 iW 1- f y Nk' avrJ 1 t. ak4k tA Nr i ax-- w« s aass z
C r-,., aa-„ ra, na s wtca- n u

0.__.___.______________._____ ._. ._,
w...., . , ,,
IS ...'..'..- I}- EfiS.6- FH:4tltA1U($ t', tRYS('4YM. Jidl N291t7 tt .... r tt.`'' 4'
ti:.,.'
i Cr) r zr a, u r i a` N
t
e
r t'- ito+.arna pu a i n tAa t t r a.
z1
1, `" 4 7-+ a w- r!- st ttt u tEo/: aa F: i ruaa- a raEIXE c t ss i
I. i6: E NS.' Z- CAI,. 5£( tY C# t B ' d{." 1 irt t'. Vt, i11 { t)- 1!!- 3l' tilNlXE Fa1A I't, Ct& 1hHY Y i}- i mv r
i r
V,
uaarat, s c rme
M
ti?-Mc€, 3 xv uxa ar a' r t
x:-c+ un u nr, e, s/ xr t t
t+) az as- aa a acs a
r t i}, a as-€ as cuss s
t ts r s%s- cr au{ a) p r x/ a.
i t
i
M r-, m- swam+ a, uv uac rown. t
fi e ur rn+
t r
rnr, 3J
ir} a- (; u a av'
q- a,2 r, ctass s
xi ' p}-
e+ t+-+ nrtr: se er s a- , nar
r5
N'?$ ItE? 1 k+ r s-, snaiaa. ca auurr; srtr. nn+
Q tz)- a. er- u' 4—(? t r a, r
4 c3)- caas. sc vmis tr navr atr
Ai"YGH C. Fi i:

W
Calcrans DQF; Encroachment Permits Office
EL C`. TRI UT1 6TY PF. AN ' : PtAh1 ACCEPTED
SCAt r 1" a C?' Permittl: 0223- 64 IV• D34S
I3aCe:
jZ j2023
Note: Oniy plans stamped with this approval
sfiali tae valid for permac construction wark.
n,.. w t, Ya. rt M... fi...,.. w.. a_.,,...

M ,.« t. xw,,. w
a wstoris U RtFY SG L t « s
r
fRlNB€ Y T. f t'3NTINENT t ST, tBtdTTE S7.
werreac- ca n R naca:
w w A t;- -
r
w__m___-__
4' 7,
F
3'`
e
i ,::
1t..%k"
r_. , aP r o o av: i taf Reddirti 1' F$ IPdE1' Y ST. 1 1N° @.. l l- 1il C urs:
a
cr zic nnawk ER -
r;.

Rs wa o oar» r s
ENG H ERING 4C CIC I I
r , nr tlW.
tY Cnl1_+-, - w
se e , o

APPROVED
Packet Pg. 647 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation i
Cal rans D02; Encraachment Permits C ffac
PC flS o4 EP1' E13
Rermm#: f1223A 5RB 0345
Dat: 29 2 23
tVca et Only plans sgamped tith this ap arcaual
shall be v ii f for permit construction wcark.
s s r tc i a r rres rxr c^ a: tc srs a+ a u r;: a cr„, a m txf aa ss rt+ a s+^ ucts
caass fs e rtat r s rro t s rt s t, a t u at,* a,
liw, i s"` x''
a r w
ia s a • rm n u ax m i:ao> an sa2a€ o
rr: urza
rtti n n+;aaa.tc rt ror+ ctas` . s. s i e xw: v
i t1 fPt1 3. rV j. . .
3+ G + .
hAC:.. ._+
J: v47 itk 4 i4SE AF..&,#. P C F# 33' CSI14i. L, 91 R« t."R, S^
w____ .. =
w...,:..._...._...:.....,.,, ". ......_....',':. . ,:._- ......»:..._.... .. .. , ..,..» . _,.,.,:.:_ .....__..;„.__._..,. y:.;:_ ....._....,.......:;........._.,,., ...,. ....,.. .,."'. ,::.__,.:_.. ( f! .. 4 iA%:.

SShAAC . r?f.eA 1G.
m..'_ ' ..... .._ ..,......_._.. :......._.........._ .,... ............_________.:... m..._._____ m_,.:.:...—____-.._( t,.. . S 4. i'SS1 .:. Sk6dL#. f'E.IAC £ E i4tlk ".:
w.
iC....._.. ......._...
r
x I , rrzf P r*a . a: x
W i e
y w. at, t ruc s€ rs + wsnaac R+ t, ustr, s. ac r r+.

M e r rt . * ,
2 cr s o
w . . .

1.J *. ,. .. ., . . au, sxrr c ruH. crtat et: a tc+ a a f n r t sr steiu« turo. r: ttt& f o`
41 ;
a. c at ar,rc j
rnxt a a+ rarac r
ccs#+tu s t c. r tw c+t u 8
ar e t z€ f t r i
Ct( H 1Y7R 4? SMd
Q.. i
laC,
C,
IE
ti alaa ;
t
y
5 µC
a ._._,........___._.._,___._._... .._._ rw._ we. w .,.___ A aC
r
l_ a._..__ F.

A
1 c;+
Q
tr.. .... .. r"
p
5 M1
1 t ' l%t'
t ra
I
I
tl u
t i
t>
LEG" F' R! @ T1l. I' S' l ., 1^ '
w
ecak: t^ao t„
A"i ii L1RID F
a..... F...
i +
a ..
p.,___. i
v,.. «.............

Y t .
4 qt
y.
y22 ki '
l
1 .
4 4 t
4 I.. s 6
t[ . . ' "; 1
C :. 45g ' .!? iCl. 7t3 ... ItYtf fl 8+ C A! p'^ d+ G.

DM a0
hnA: C i0 ,: . .,_.,... ..
r... a. w_
F;•. r
Q .. _.
r
w, t 7F
t``$ a. . .
t` g j" p .. _ C J
W 9t0 . .' » . . . . :. _, , I. t. ^ WM
k F
t T Tl'P
i
I
1lWC5 tK Y fi EJ 1 W
M
aa., .., ,
w a- . .
arr
t M s n? r.t . ra
ta,
r. _
t r- ca.:- cav, c a- r-; t:
z . 3 M
j. a7Gt).+± d n) J,+ r r•, }' J ' I I-- 2i- t.€ PHA,' Rt aER: CGC t?ARY 2` t'.. ..._:_.__.....,. m:"`^ e.: . , .
e __—___. . v.. ...
4 nac,
f j
cnrc
r
arnn C 8! s . ...

F y
uax t-=a
t i1+. sa a ras, rr 2
j
G'
R
a/ sr:, ` st- t7a 3n- w,a e:- t, sa;- ratt s.

F
a.,
a
t!- r ew- u- frt. wl' aa a
r
ew_... _,_ _ S k- ro4sw- s- s wa G r/ e' a u
N
EE. EC'' RI ti"1' il.Il`Y 1., ; C.'' R1C U"""ILIYY L Pd m, r:
xw. a^ a c 6: r- at e.... .
t . r. .. .,. s.., .,,<... ....,- 0- N, v._.,
F ewsaor s
w. VEt iFY SCA E ' z
a.,:. ,,, , ,,. N
r tr T sr., cc rr r. s r,rau° r r.

C;.. f. .,\ ' 3Z.. .._... 5}.,__.

WOIiK_ Oi2: DE t FdCk, .
r
w._.....s _ a.......:........__... i , , t, ..
d: w
j'
M
w.. 1 ,.. _ t.- _ Cs*(.• ti„ J
a;., n pacru o Bv: Cif.jt t f F eddir g , „, ' I tM` Y 7". IK fV` f . IG` t' tPdG Ev s o:
ec7rtrc nawa s - as wos n osr,,, xa beloW.
e__ r:..= w
r s ea ric EI CtCiC tJtili Y G tll .,.,,;
sw T e o +

APPROVED
Packet Pg. 648 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation a ir':
9 I. d.4'Ai%1N T RQ ? Q SRf T L{ ia 815Xi.' L L"$ fA7SYUJGCL' a; AtM.t' .. i 1? :. i Si tEEi Sk.4€ T,.
8+ G 6+ C
I
t15'tY#` fF
t;, iC fi.. 4A
ht,',
CiL# k At d' 51C+- 34 Ttis 9L E ACCFPt+4`,
u'
l
Qt, f 4' i'ti 1? tHSYAt a4' F eY. fkPP5F t3 SfbBti CG iit% Se t7t{ X dklfCfifiJR A7 a._. e............,.:.:
tG......«»....
f,..... ..»... v... s.............: ...: 1..»* e......»« «..».:

T««.....
s ...+

0.«..* ,., ... .. ..... ....
tit'sE 4F f`v3iEY47R REt! 7N` l'Arii. E6 ft R.

I
tc l ja
A.
s. '`
Pef so .
a - _ . ,. ,, =
s, n; . . .. ,.... . . , .... ,
A.
sQii `'
e• r Caltraris C 02, Encra chrnent mits Of ice
T
c
Pt. d 5 EPTEC9
w eu
r ° u<
sin
R. s. . n. . _ ..
b
Permi i: d3345
J
i2 a a x,?,
y ,, _.. i ,
Date: J2 j2t923
t, zsc, c ax ;".:+ c a ' ' Nc te: t3nly plans starrrp d vuith this approval a_a., c a b y __. .
4 , ,,.._. w,,,,.,. M ._. ..; r--=-___.....: . : __ _ ,. .:. _ ___ .... ,___ .. ,... , _.,._._:_ ._ ._._._._,. ,:_... F _ _. w._ w _,__.__--------- m._,_ . sh ll be ualid f r permit constructican work.

Is,t,,-;, __ _______._. a r a..._____ r aa osa 1
a t uh G
c:, . _° ..... _. 1 .. -
SI3M ' .. .. .... .

Y _...
i S. ly. Yu'/ k'
I. thil
i,'
e i Nfiht. Tti7B9Y IOtJftf7 l1M
r.. l ... . 5
i
a..._ t. i
Y
GV f P69O w W B Y&. P& B i" WpiWV
U9""° ST. ckD fi$' CiUS71A 87.

C# LE. 9" x f}
t
t
g .
a.
i .'', . i
r. 4 .,.
y
i
r
3S T t
j
6 tC
ti
s
t ,,. 1
r
a a • '
v,
tx
x
w,_ .. __
x
ut3
w,,
r t G
b Ei r
1} J7911q.

17.911r.3U
Q
Gf33YL ' j
fih "
r
k.`
aY9t} di
J") 41C4
a-,
v._ } f497Q" 1
1 - _ .

W+ F K
i-.._..._.._.. a5' ,._.
7r".__,
aa7`11tid SGtrAG j
P2 ...-. - N...._....—. F'"{( S}- EtG230- C{ g,INXCd Tf l. 35( 5i(a`a,. i t67S td.li- S-` 7.fNl. 9kALL tED NJb I N
m
4 a-> -
T; i"
ij- 1N.- 31= StNGIE PNAE€ F SfR, SEC .... 2'
tc
r-` _ . __ ,_.. .:___. .. _
t
EL CTRI 1, tl7"p# TY K+., td
r
4 u7TE s7'. tt E%uwotAl s 143t E 1"S d...

S AR.. s 1" 9tF"
ca.
r,..,.,.«.... ..<.,.,:, .,,,.,,..., wr,.:„. ,... .,...«., RENSIdPVS ..
w t` i, tl,. .:[
ra
r ,,
n . a. ,_., n 2.: i r r C r g, r. ' ' 7RE lITY 3T. ICONTIPI FdT; AL ' P. f U' 1' 1". m wcrrtcc- eaa s a ra_ e e__ k . a ..- 7' --' _
3-( 36 7, t . t5 ; . t i -' "
W_. ._._..___.__._
4 . _.... C%,,: i._;{.
a_ . aP- a i ev: Ciltyy rf F' ddir g
i" tlftitlli' Y ":; f C 1# Y IL. ita' i7"1 G a vis sN:

LL .._. t cTsarc aar a a . i } beBow:
y
RaHot'ED 5' 4t1s8
ENfliNEERiNG 1' fC.. J[` J 0•.. . '.; sNEET CSF

APPROVED
Packet Pg. 649 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation 2023 STANDARD PLAN A87A u,
4h
X l
y
3 @ '
U
ia
P
On
Oun
O
n
nv
n
w
M O+
Ov
m
T Y
O
O a 0b
O

VZOOOO O O O OO O O O O O OO
W$ mJ

OOOOOO O OOOOOOOO
ua
y
6 g"
4a
o
8 a
a ommm mQ oQmP
n
e„ i , i ^
a
O
i
a a
aa
aam
m
m
mm
m
3 m
o
W
z
y o' o d
1t C: a
g g W
a';
a$
apa
f' q{ aa'.. u VVi
i ••-
o
oa
so z
rzZQ
B
m
nQ
N ry
a; N, : :- e
o I
e
n
P
N
PN
M.

V
O
Y
N' ' m^^• . o.. ^
W
3 m
Z 3\ m \ d.\ j n\
e
W
V
Q
N
N
N~ fV N .-
N
a
N Z .
a
TO
b
A
W
N
o
mcx ivmio m" v+ i vio"v ion in"v in %
i
vO iv.

O lv
O
P
O
0WbmpmOmv tpvpvp P
T
Q4 Q
t
Km fLmm m mOO x'K1
ZH„
w
o w>
n
uWi
W
m o¢
U Ua m azo
v
s
o-° , '
v I 3 I J m N
N
m
v o
z Q.

W
i
N
o
d
v
r r- ti
r
e
o 1 e
a.a
Z
N
p
p
j'`
3 C WYZ
a
D e.

E
O Q
Y.,
2 NI ( W
OZ
g
N
xN
u Fo Q n
n 1
o
Q
p
V
U
r
c..> w
PQ
oc
Q `.
e
V oi
a a
wcw
c a°
o'
c
m
y
v I 3 u E a m E v u o o N' m
Ns a n E:

Jw fD
g
ti
aw C F. u pm
a
o
F
ZH.. .

K c 3 ZH
po ca
r
m
x
o
r
c '
r
oy
o ,
ux
mT t¢. ai ' KQ ' N
U'
Xum Oi plb pr
Z
3 iG iv'
1 m0 3
aj
Q
Q a
Q C " ` m
w ,_
O L]
iC\ c]
m WU
O
W
U C S Ob
O
J
W
o i ,
o
g
a?
I. H..
i t- g
tM
a
T m $ o u x
z Ig
u' '
vi p\ Q o E E cc
r ' ty ° "
e
Y
W U p =
N
p Ot
Q i It m K m Oi
Orn 6C
rT
Q Q
1• t}
N
y
C
22 EG 4
E=
o uu o°d
O oA
F da
o
2 x o . Q .
z au`
o
p
LL
N
N
N D
W wg m
wa ,
m
Qi: n
oo
ao rv
a ?
o
a
s n ' > u N
z
U
a Z c,
l
m
yQ
y
yW
1 O ;
N a : Q
h m mm
C Cp
t
6 W
N
W V , ; O_ On
O
dH„ e 4. 2H a '^
o pp_c
m
z
T '
u
iu
Fa n ' ° gmp
V
O y
Z
n
p oE 0Y0
Z
W
W
3 w dY1Vtl
Q
I , x Q
a a e a
a a ^
T
O
N
O
O
dCb
2Z
Z
a
N
K m
u
a'E
O i- .
p
w
W
W
I. I_ U = e
lP
3 30Vtl0
W lH. lN, T '
c
m- +`
N

LHOIVHLS
a
r
a cQ o.
m
U
m
V O ~ d •-
d
Y
W I v„
a m „ ZH.. ,.

B
m
n
U
O °
so
iw K
a
j
p
j
I
g E ° eo
3w
a
i
Q I U
n ;
CJ Q =
g ooc N¢s i ,n & W^ ti— s o r
3= mw o` .
9 n
w
Q
o
m
x o oallo
O JD^
xNO I w
m -
W N .. mO YO m00
Z
Z
1 T
N \-—
i >
u ' °
sc wgvt
tH. F- ¢
lH 1- W) Q x tio
u
u xc
g oa ma
Z
a n
v
166

APPROVED
Packet Pg. 650 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation 2023 STANDARD PLAN A88A
n
p, c` 1 N C, w
yg v
E o
n ri E u; a {
Q
C
6,§ wl
j m
V
w
c a uE ox o mnu
rm -
g
8 V
u Qu TO
OO
p
O
m O
OE% m- .
9 N
O
E00 oEC
O
p
E m >
L
Yuon V ?
Q
4 S`
O YO oOa P O
J 0C= ; O`
u
YOO
O
3n
O
g Eo on" , v_'o = w o ogo
0 000c'^° $`
o
Q
h,
N
Ea
D
o onc r on =
d
o o mc a +- Et
h o_ SEua yo
s
o
v
z Eci ti
g noov c
n o
O (/
g^ nOOtCu `{
p
C_
C
EO
O 0L L DL' O OU
J
d
oo° O0
g< a of- Up
O o=«
v i E oE oai i
N~
Z
y-+
Na€.

Z
u Fm'
a R°' °
o °°' E°'
n
4E° mg
Li
o
g
a n `
o
Q
C
N
v
S4
Yc+- O *
E
u
qN `
O
O
N
O
O Oim -
0G
L
l
OL
w II
t
T
a b^:

J V $ g8' vh c Dv bg
a o`
c
ca +° oo' oc E > ;
3 a```,
z,.
a '¢ <_
g
W
N
a ^ W,
Z
p
m. o » T @ +.
8 c.o w
o_
uu
Wj
oaz
m
z
Z
2ga '
Q
GaVEnQ
O
V
L 1.
t U ` ga
ac 1. p+
m H<
W 1- NF QN LL
iC I1
U
OO GC Lt
C
W
a vuu
o
g.
6 c o " owa o ,.,<
a
g `
cg a" agm m v '° oac > ° E° °
D
n
t
mv
c ° s
n
uLLos
z
o-'--
a
uaN
w
N
o
a$'^ ^ om - °: : cm ao_ g - c4'. uo g -
O "
m
a i-W
Q }-
l
a o'
o
Y
r ` nac o^
o ov °
y`
a
w '
y
x
a E ' s° vu
u ga Ta
Q
a
E
t r =
z
W
d
y
O
O
C
OW
Y PC y0
GN TN e90 jJV
I 1-
gl I- EJ T a „
W
WZM
O•_
C O_. Om pU%
F
V OOi " > O• {
I Llf aF
W
O
O 8
W
Z '
Ev a"'
n
o u' c" °' ce- gg o=°°• Gp v
ov4'
i
N
u'i¢
tiwn um
j
OOO O >>.-
o
o
o ai u .
m
c
o L«
o
v v
n
am
OO
O
O OO• T,
a•
v uoE , cg
a o? o0 oog am± tE
u gc°
c
c U'
u_ a= ut
d o
W
m nc ° ° n
so o° a ?
w W °` om o'
n
o+- g °`
o
a O ° °
g gc ` cgauc
E o °
3o
v a
J aoauoo Eq•- Xg on a ` u °
cg «
g s°'_
c^
E
n`
o cc
i
Q$ -
z
oN
a m ti'" °- a ' E ._ mg
o
a
u o_
a x '='
o
m
2 U
Q
CUq
m
y iVC Np
O
Lr
3m «
N
NN- Pr om
V- 4sG
O iE >
Q' z- '_ w= me° •- ` od S "
0 ._
oE -
am
3 Q Q ~ iz U ° v= u'
c
D no ° u nO . Ec
d
m g
gmuw -$
mL
a
CO Od
N dEa O•-
a
c
W
u
FW
tooa oa E :
o O `
cv
m6rnoEu ' acc ot
H -;
av .
n « m€
m 8 ' E Y a
i v_,
o
o
w in ma_ o cy
m
P ? a `- vWi
n`os onc w £
m QY fF' c ax
c 3'F rr Ecadc = E' mo
ZW
O
aPr- uo.- a . ina
yo uoo r ]) aEm in tt ou
O
O jn= ' Z ti
M
vN
N
rm
PO
NV
O
Q ' Oa 1!
im L V QOQ 0 C
i
3 C
O
WN
Z
Z
6 p
Nt/
0 Cl
I TQ '
V<
3 `
C
a
N
Q
z ' m ° u
o
w
T %
S
t
8 K
u Q "
m
o zu
U
m I xoh ma
g / no coryo < W
o
a
o Nx _ "' I Z m z
U
ax y,5•
N': au
Y, t
v
a
u
zl O '
P
m ¢`= I o
O
r
a
n
D
U n
o u; fU m
Z Vz
i
oWa
ui N ^
W
wn
z VI
c m
mN
u
8V
i I
i , m
N
zo
r
i ° Y3NV _
m WzI
oo
W
m
N °
6 /
W
W
J
DNf1NV" Id Q
s I
W= d¢
i
a l 9i
u
i on a5-_1p ^- JQ "
C
ro
p
c
w
U w; ZOt ^ ULL
N
88 am
w
d l
z
rmwa
o
W
ae
9 O
O
T WJN
2 u0
W
Y
Z
K WW
N
W
U
S••`
N
v I o . XYSW
o
g„° ° ° 0301AOHd dt M' 1VMSSOtl
LLLL
q
ao OW°oa
P
yJ
Q
N uiY1

XS' G ' Q
a
b
a
8g
Uc
iW
Z
ioa
Y
c
aO
sv
a Fa Y3NV z z o b c
y Q ,
Qn
e `
c
c
v o
J
maa m- p Jc
u
W
a o00
N
m ¢...
p Qo eQ
W
ap
o
s
W_ zwW Q ,
a Z _
N
o
J
U W
O Wti
p
4 QO vym
W
zu ao
a
W
o
d'
6 Y
wJZo
Q
g
O
H
oQ "'
z
LL
W
u T
a
b) H adi
uYl VI
N
N a
Z
VI
i x5'
t
T
uiW
m
o
W
x
I0
m = .,
z-.>
saass,°$ m
w <
K s.
s,
s g `
W
W c.>
n • 'l
888s8 ' t8 n VS ._
u Y1
o
G Q (
n
w
a &$
1 v
6 a°
v
w ti
a ci
r
K
xo a
r.si
o0
3 w>
s° vu
s sc
0301AOtld I HIVMSSOk!]
a=
oF sa
s
o+a
aa
su aa
cz
o
Z
s
r
J
o
3y\ j
0 88
8 aO
a
j\ a ~
oa "'
O
o
g wuW
s
i o_ ¢ HlVM30 5
b'
W
J
win
4 N
u a
J
Q
n
u
o Q `
Zo ma % '
a _
ma %
C
N
QNV n` Q
N
so8
y
p
a
pogy // a ~
J
tl PI(
v
XOW 68b ' C
N
x'
U
yb If iSLBG
P-.
t
W
y W
Y.S'!$$
8 Q Q ^
Y.S'
1 8$ ;`'
a U
Ory ' B$
c xor zs• ° s° ° 8§
o RpM °°
dW
F
T 1
a
Y o" r
a o
o
g
s
v
o
a
u
168

APPROVED
Packet Pg. 651 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation 2023 STANDARD PLAN T30
o . .
y
O
o
s
EJ X %
X
M
U
@
b
O 4- W
ti ti O
ff
w < w < co
aa - ;
h a W W < W
w8:
m
a
u ox ux F,.

U
Y i w 3 Y&
0 3
o UVW
so
a
LL<
o
a s; o o
a` 4
a
Z "'
o
N
h o $ m
Z
o
ZJ Q
a `
gpQ u` – z`
o
a
4 a
c`i
a ¢ N ? < 3
0 w
0r
6 rN ^ O W
Z
py
w i,
o z " 4
c
W V1 J ++ • ', iC + - y} U w Q
i
v
W
og aQa
wom
vo
ms
Q ocn' a
Q
arm

IIIIIIIIIIIII
a
o
aa
a
o.o
w =
u
W
rX
KU
W
a C+d
pV rv iy" O ^ L a cona
gl
N
mno

I ( I I I I) I(' I
ot
d wrn" v uw
Ff
px. io+a
YM
pZ
Y@
m
3w o,
iN ag
Q
i V I(
Yyq
q C `
i
O
g ; b `
Y
ag
m¢ o_
t
4'
V
J Ci
OQ Wp
g ov
Ec
u Y _' m g `
W
c
a c'
s a« aoswi
rn
o amas xorc
s ;
m
R9- tta
N
o pp
aE
L y0
aL 3
o
LL
L
YT
P
g g `
ao
p
g
a
b o0
a
YO :
c
m n.'
p
UM
Ou POC
Y
C C ' j
3 Q
C
Q
0 0
o
w
V hy
L
C
H
VOm
l
n
C dYD 3–
d I'
A
ri
t
b u gd V
r
a ° tl
I r
o ain.
2 N
n
345

APPROVED
Packet Pg. 652 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation 2023 STANDARD
P AN T9
c
W tn F—
U
e
N
M
c
v
J
W
vi o v io Eo M O
h`
V
V N+
1N
N
O
P
W
N
n
g
o, o
a
g
o
D<'
P
6o
C
h
m„'; ov iuio w' vum
0 w.
8 1Y.
m o°
m y'J
Q
og4W
a
Zo Wa
o W(,
F
o00o mm
N
o
g
N
a
o
o
n u+ o$
L a ~
a z a !,
w.
g
u
a <`
M ~ 49p
Z v+
N
G
L_y
4 a
8 w E ° ae'i,`, u J Z v
mo,cJ
1-
Q
Eoga wi '
3 r6
o$'
m
FQ
NE E %- n m
Z
aa `
s"
ogg
o
OW
r8.a
VZ
0 0 LL d-=-
m
Q
a
a
eww co°
c
CJ
o
onm
N
3 QqUOE
222
W
O]
CU
m
m
4 S
O 6
ULQ
K
QGwX 1Y
l_I—
N
P
GX
C
m
yl
N Nm yp
g NONtOp nQ C G U i
Z
g
ao
y
b
a `
t
a ; S, m
g a
aa o 1O
Qem o+
a
a
Q o U O _
M
C N ( yl Z
G9
W
E}
J j' °, ° u°°i o
i'^
mo
ti rv
omn '
u
m m
vviv+o^
i
cEo. E
QH J
qpC m
twv
zW ioo cg 0 N O N O b N Oi r f N l q O
rQ
O
J ' wnc mrn
u m • u
xa
d
W
dON YfOYNNNbON
a
Ec
vr x :
x
t
o,
c'i
2 N
Y
O N!
1 O
N

NN INVN
N y.

Ym
H l] Z u
o Emc
ZN
W
E
g
u Z ~
OO
O O$ o o
OO O
Q
Eu
W
L mvC q a QO
0 C
d
QN
Z
r
S
X d
N
vl
n
V1
O VIOO
V
i
N
Vl
N
m
C 1
C
QU ox Q v
Q6.

K
mE
wW ; ,: .. .. omom S' mm8 `
o
gm
F
U
X ti =
J
Q
b
NN tPVN
N M ?
m
PL
W E'°
S
J _
O
c; e
c
67 2 ^
to,
mn0000000o
v
e
Q !-( ,".,,
a
o
r
o
n
a
P
o
H ('
L
W 4 J
y
fr %
W
N
f
J m : } o
ad o J" " E a
om u+
o 00
o
Nom
o o +
E ' m + [
d
a2 Z=
a. oN Nncom
mm moo
QQ
o cc
a` omo» mg y •
c
f2 3
u EE -
u
v
O V o00 0 o
m
otvomo e0pvv
p Q my o
w
Q
N
NM
b
O rv
v
C ro
36 6
LQ
O
OO
U
L90 00 0 d d J 3 y
gn
W oo
oao o °" wm
N
u
E
tin
w
o
tp
4 LL
mm
X
323

APPROVED
Packet Pg. 653 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation 2023 STANDARD PLAN T11 cn c p
y
w
a FU
g oo
WZ C7 b
x '
Q y
N 0=
w
W g u ,- in
Q
m
W
O
n"
x
x'
9 w C
J %
X
n-'
C
8g8
o
w
o: ff, o
o
a
m
g J'
Z
aha :
u
E o Np
N
os
rz
p
w
a ; ,
c p
a
g'
o
N cai
c oo Z,VZ W
no
E
f
p
W
Z 0
Z
o
Z
d «',: UZZ a a N g n c a o
N'
V, I C
w <
I Q
Q
W +
a+ Jm
Nz
u
N _
L6
W
u,
x`
o o .
o
QOZ
d c°-`s m Q
o
Q
Wa I I i
N ?
g _°u
ca
aw
J
na
o
p
til
o
c
a uc wl LL LL s
a
J
u
oo
W F

J LL I I
mco
o
J
n .

C
Z uw ar°.

L
z
O --
O
a
w ii I I vi -' 1 o
u
O
OT
ad
o
g o0
W
s _
5 v
o
W I I i
o
u .
o; '
n
O
O aw
p
Y
p
O O !
p
Z
p
Tm
L
l
m
N `
mo yn I w p o i
m
u°
z CJ w'
r ojE
w
o o` I I t`n W w' n c U y] a v
g° ° LL
J
o
u wc
o v < vec
6C =
U
mO
Q
Ju
Q ON qjW u a pu _u
I ` I (• $
n- E ° g a
z 11 c m
c o
c o
a
U •
x
a '
u Wwu
u- vi
u
rm
z
am
aaN!- I I a
U Y i +' bU E x v
u '
v
o mpa
OT ObGd
U
N
C
b0 d 41
K
y OC
fV W d LO 4'^}
M r.,. ,- W
9Lm 3Wo v r b •"- ' as
caa
a oo
o am n. I awl ag8 ° r a`
S
60 }
a g ot{ v >
E
g Wi' a in c g.- o` - o- mQ,- I aol
J
o$
r ou gop w m °`
wa o ua
y oa
CL Oi • }
OOm I
uN4
q
0] L>
ar og
s^
Wo
O
dgg= =
a
o P.-o
o . =: Po 8>"
0 I I Qz
o o$ a Wu.

L E,`°.
g
W NQ
pp tir EypO
N QLL
Q YC
NI '
L
oW DmO
cLLo ic E`
o a.- ,° c
o
o ._ .,.
d
Z
N r+
f
v
326

APPROVED
Packet Pg. 654 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation 3 A
O._.__ STATE ROUTE
O_ _
r
Q
1000'± o 300'±
m (
i
OQ E i
Ct} NSTRUCTION AREA SIGNS

TYPICAL PUB IC ROAD CONNECTION
CQNSTRUCTIQN AREA SIGNS ( STATI4NARY Ni4UNTED)

TYPE CODE PANEL SIZE SIGN MESSAGE
NUMBER AND No. OF

SIZE OF POST SIGNS
q ' W20-
1 48"
x 48"

ROAD WORK
AHEAD
1 - 4"
x 6"
B G20-
Z 36"
x 16" END ROAD WORK 1 - 4"
x 4"
NOTE:

1. EXACT SIGN LOCATIONS TO 8E APPROVED BY THE STATE REPRESEMTATIVE.

2. StGNS SHOw1N WITH ( CA) INDICATE CALIFORNIA MUTCD SIGN CODE, Ol' HERWISE FEDERAL SIGN COOES ARE SNOWN.

LOCATION IttHEN WORK IS
IN PROGRESS OR AS DIRECTEd
BY THE STATE REPRESENTATIVE. OPEN C31A( CA)
TRENCH C27( CA) % I /^
24"
x 29" / OPEN
PORTABIE \ TRE iCk/
SIGN

TRAFFIC CONES
50' AFFIX TRAFFIC CONES C- C
NJITN 13" REFLECTIVE i SLEEVE FOR NIGHTIME USE.
6' i R
WAY
ED NIGHT TiME OR NO WORK
9: IpR IN PROGRESS IOCATION
2" OR
f'
r7 OR A5 DIRECTED BY

GREATER
Z,
J 1
THE STATE REPRESENTATIVE.
n
TEdAP FIL FAATERIAL
iC0l PACT}
OPEN TRENCH SIGNING AND 111lARKIN+
G
PLACE AT 250' IhlTERVALS7 1F;€} fl GH
TNE OPEN TRENCFi A€2EA taE iNAE
C27tCA> tOPER! TRENCH) AND C31A( CtcD
fld0 SH ULDER) SiGNS OR AS E} I tECTEfJ
8YT iE STATE REPRESEPdTAi/ E.

NO SCAI.E

DISTRICT
2 STAhI, DET1
L 3 ' k EViSEO: iQ- 2
Q

APPROVED
Packet Pg. 655 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation 2018 D2 PERMIT DETA1 EP2
W
0 Q ,
o Ww
y
N
m
r oa
w
o
gw
1 tiv
o
a s ¢
z oi NP
J d.
a
Z " 30 o^ z W '
W
tiNVJiW ¢
W Wo 6
a"
W o
w W !
Q
a
N°' o'
n
z Q¢ z <
O
a m o LL <
J V1
c u-'
ii-`
o -¢ Y ¢ Q ¢ a `
S
I"
Z Q
I
W
m = O -
u
aw
vV
7 W
W
o? m
o a¢ o = z
VQ
3 N Z = S
M— '-' "-
m
W Z
2 a F c`'v
x „ o
p
m
i
v
W
o
t
K
c. :::: a¢
Q
w ~ pO vai JT
a a,
Z
N
U
aa
p
vWi
w 0
N
r.
a
IZ
W Z
w
W
z O
N
a
Z
Z w¢ Qf.

V
Z
x
n
a
w
Z -i No, V =
v
W In = tn T i T W O
N '' Q
W
Qw
a f'
r
N No
Y1 Z
N
yF
aw0
QW
o
J
F
1- FV o ao¢ W W N W
CJ
Z
i
tU
O OWO = 3 ¢ ' pJ.' T '
7 y -
W W .. OW
wFw a 3 tZ oo¢ ¢ q ¢
m? ln
N W ao
0 Q za o 3 aa
Z u i
W
Ww
wa
ci cas
w ca =
W
wo
c i ¢ i,, o >
O
a
o p` r- wm
S
F
wa
3 m
d
T
7 W
wO
r x' t-,
i
J
a- v
z
a Q 3LL o co
f- iM1i:

O
O
z
W
m 0 m
m
0 0'
g r i
v , a
s
I ,_, w
oJ
m
O c.> ii Q ¢
M
Q
W
sc'Qi Y
n
ivZ N¢ Yz
Q
oNd
Z
x
cp NinW a uw F.,
i
in
j
Zz
mz m a c' iQ' mvWim CD
Q
o Pp
OM
m
V ¢ av` Q
Z
a
Ul
a
a
o
w= F
y
2M
TK
L
Om
j
FU.

W
x O
W
F W ; w Jj Oo a tn
ZZ
B
o
p
N w I a(— p
a'6 W¢
W w
u 1- OU
O
I°' I "
C
Z
c za
c .

S
ZZ
IzI
W
oa Wa CD
ONW I n I Y o
4¢
Z
p a4
N tn
Q ( WI
o oW .

T
4 Q W= a ¢
N io3 Ww
za
m <
O
J
c.=- ytr_
C'
v
JZ Q .,
W
c i
O
i G:

F
h
J ,., Z ~
WO
Vf W ' J. Y{ M':.
f 'V 3 {-
p; ' - X w.....,.:

G
N
O
N WQ
O r.

Qt" i.

J O'
Z
0 N
S
Z
m0.:,.:,. 1-
U Q
s
n w '^ uw
z;.'_;.
o
ap z ,
Q
Z
a°--. aa W `.: w'::`.:_::. -
p
a
c'.

W Vf
T
w
a a cn •¢.:: w.. cv Iw au+
eY
n >
m
J
w in
a
N
a - -
o
aW
a
wW r :
dN
Z
V
O
a
W
Z
3 UZ
W W • .
w c=i
W Z Z ' I 1 Is n a
1 r
Z= a J
Fo
ia 1 Z
v FO
CLlJW
N i i N
oi
4 i%
Q a
x
3 1 a
W
o
Z
tn
Z =
LL
O
m0F
T
O
Z
j
W
m IO Y CJ
P
M
4 W
Z
N W¢ N €
V
h'
Z
W
SV
p
4 t
v
i 2>
W¢
a
j
oNy
O 1"
mm¢
o zw n '
aw^ = u = s,°', nWa
Z n Q
v
q
Q tJ ONtis OLLd ZN = m~ Z2NZQ0 a6
4 C
a
z
o
aa w -—,—
o
a'
N
N
N
jOm = =
y
O ==
N
uQ
Q Q=
Q p '
O
3 y
W
i
W
V1
O m' Ql- 41
m... V mNNO JOWNQ
W
W
I / I
U¢
O'
L 2
nT£
Q2W O=
J
J
V1tJ OJviG
a
W /
LE pO r p W O p 0 2 Z O N 2
4-
2 V ~
S Z¢ 2<
C
V
I I [
CLL ~
o
OL
U6y
j LLZ
S
ZZ
WW = W = LLN
ZN6U'
U
S If I
1-
i
t 01
p
U
O
Q >
N 4
R
V
n O =
Ud
Ou uY Z
Q
W O _
V
mZ
UO
Z
W O
v
j_ O
W 2'
X
2 OC
J
a lV Q
q..

L
n
J,
Q
W
N
W
a
W UZ
1 FOO Q . ;
O
j
m C1 •
Q =
u
F N=
J6
m W .. 1
O
K Ji02 J .

Z
2 W Z fJ
w t }
o
a a „
o
LL6
w
U W' N <
o
a a
a
z
O
o=
o
dH) , I h
Ua
u U puw < i- W = On u >' N ' I
l!1lO
W
d
2 V .
m 4=R VI^
N LL Z=
yi.

Z
W
y
Q
C
r
Q
r
Z
a na " W< -
a af.,""' vai aLL'=¢ o= =
d3 I W
I
W
Q
V
oU
o
m¢ oeaw xo " vr _
F
x_-
a I I _ < Y.
w
a a a
W
W
waa r- vppp
y
x in
w
w a ¢_
i
w
N
t Y.

NO
4 Q
2 N m =
0{W mQ
Q
Z y=j~ aNwN gO W'
a
li n. L 0.

V1
3 N j
Q
O
4 u >
yj W Q
2 Z
p
O 2¢
np<
o
V Q= y_ 1
z
Q
S = —
Q 06
S jN
Q 4 OZN
J4j
0 WL
x
O
N
1-
Q
O W _!-
N
W
Q
6 fG =
Z U
N
W
t
ZV 1y . NO W .

Fy
2 W
Q
Z 1- 226 .

W
m
OQ
S
m lV O '
1 U>; 4< V1
p
N Y- tp
m
N
m 4 !-Nm 1-N y1
m

APPROVED
Packet Pg. 656 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation a Q c '
c
N
c =
c
o
Q r.- cu : p
o ° `
o
Q
Q 3 3
o o'
O ?
y
C
V
O
V
C
p
f6
N a '
N
O
W
C
C O C C Llll tn p N
O
cn
Q .
m C
d
co Qv N
a
a
ai '
ao
c c = c
a . W ' fl- •
c n.
j a
w
ai
j
o
a o • -
y
Q a . a i
o
u a>
v
v O
c
O (
6 Q- > „_ " C .

O
U
V
p pV
W c0 C vs
Q
C
N
i
j„
tn,, »-'
O LLI
N
NC
S ( 6 .

Y
Z c
N
LN
aV
N
C> ( Tf
n O . Q - t'j
F- Q c
U cn
N o o
@
oc
O
N
a' l0
O
C Q' N t0 `' ' N
C
QN N O .
@
0 Q ` p a N C
O
i
N
0U
n
U c
Q c'
i
o
UO G.
3 i c d o c °' m a a a. °'
Z o °' • u°-,
ai
E ~
Y
m rz0 a W a
o
oV
Q
o o
a
a ° r=
L
t- E .•
o
y
v vi cB
v
O
Z N _ d tn d f0 N
4 0I
d
V O = OV t_6
d
o
C
Z cn a
E
J rn
n.

N `
w.. Z v)
j_
Q' C C
i
OQ m p 0
O
c a E- 3
Ec
Z
E
T
j '
V
L
i
j, C t
QC
N
N
a
a p
ai
a'
vi ai
a
o
o
o .
o
Q Q .

Ez
o
o
zW
a a
o =
W
3 a a o
o N
Q
v , ,
c
Q
vZ
N N .

C
O
a,
U
d
c
Q
N c E - v,
a
o
OG ca m o- ,
R
0 V p = ° o `° a ° cmi
t¢-
Z
O c c
tn
to
c Wo I- W =
W a
3 m :=
1 Z

APPROVED
Packet Pg. 657 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation a -
m a
o
m ,
Lr
N
Q
d .
m
o co oU i V fl.

O `•'_ -
C
N
i U U O
L
ll '
p
Q
W
C
N
u , t4
O
U
U
C (n a (
Q
C
C -
C
d i
C
O
C O 4+ 0 0 C N Q U O `
O
N
Q 3
C
N `- Rf O C
W V
N r'
a`' O
C N
Q
C0
O
O O U '+_

V' V N N
6 ,
O
O n.
0 N
Q C ` Q
F— O tn N
O
N
N
y L
n C1 (
O
Q Q)
L
L L.

L
O F i+ i+ OT 0 V L R y O C L.

C
V W .
0 V6
N
p tll . ln U fn
n p . 0 C C
Q tB +
O
O
N
0 t6 ',
N
r
c
G t6
y
Q.

N
p
Q Q y
6 O
G
C
C
C
V
o c o
ai
m
c
a
c
d
a
d
Q . L U ,
N
L
N
L
O
O
N N
L
V
V
L
LL
F- i ° o rn a d a a Z
a - `° o ` o .` o p .`
cn ° W
0 c
c
cc
c
N as
m
m
p
U
f
co
vi ' Y
UU
V
U
Q F— c - O "_
F'
L I— ti,
Z 3 cu -'
a m ` o
o
Qc a . c '
3 a ca a)
V Q `
m d . d d
3 E E E E
a o . .,.°'., c ' °
z in z <n
z ii
z in
a
U o =
oQ c > E
Z o ;, o '
m °
c °-
N

O , C (
6 3 '
Q
W i.y
N N c c Q.

O
O
O
O
W .

Q N N
G
C
U
V C>
V
p F.,
o O > N .. L..
r_-
T.
i
f
r a.'+
Q
Z

N U E '
a f0
C
C
C
C
z
W
C
C
O
O
O
O
O p • - .

Y o °- Gs c cy
N
W
a
E
E
E
E
Q
V aci - a -
L
Q
N a, ,
o a
a
a
a
o N -
o o
0 0
0 V
ai
3 ° ° ai
E
EE
E Z - a R R a ca
c~nWo
m c°'a .
w
m c
z
z
z
z

APPROVED
Packet Pg. 658 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation 0 o' Q
U e.; 4='
i
6 a
CN
py
6 r/1
q' D"
C
Ql
v
N
i v"
v a -
P 4 ia o, t
N
Q
u
a
N i.. l
V:. C.
c
C• r..
0 QCJ.
r.+ Q

9.1 o
W
m
N
N m
C
c
o
6 O• yLL
ID
N. l m
O.. t7Q iss
i
w"
t7v a m `
a
N V W.. p
p,
U D.
tJa ' t/)
py.

Z
t
6 E
m
U
c
m
cQ
oC
v3 4EE
oa
m
s"
za
a ri
Q aa
E
c
c•
ui
o m
m
E
Q C C y
zu
a
o a..
c
v c
om
E
ro
L
c Ein
a
m
C
Q oZ
E, t
N
en
aN
oo ; : o- E v v N
Q
a ¢ m
o
a,
c oN
ami
p..
a.
@ Q.,,,,,. @ .
vC
g
Z
O C' Q7
Q f0!.-'. f3.

Q
F. tn. 61..

Q
y
d. e6
LI
G
o
Qp VJ : Of
q p.( g U7 ..
d
W V
Cn
N C L' d . 41 U
C . ..
t7r
W
C N.. O .
p t6 O} Q. O. '
uo v! : q);
n
r.
a
o
E Q---, aa I c
a c
w a; v, a y
J,p 3 a' ` o
O
o
e( c
p V`}.
vs: i '
O p °
C
Z
d
C p
o
G >. Ii . ` W . . C+-' . . m: !` fn. `
Q
a o
m . c
c j in C1
F cn.
d ' u}
cj
W o p L
Z "
O o
E O ""'
o o ' iaC?
Q !. C a a g
tCi..
s
C
C
J
o W: ' O .. Z7 U .

Q y . 4C?. LL .
3 t.?
C? W t W vr sa
OU a , o c`v
4} .`: ` ` D. Li-. N .,
Fpy
M Lf
dl ..

Q C_' .,.. U : o .

LJ
W
Q) tlS e. o .

CA Q O
rr Z
U
I '
3 cn c

APPROVED
Packet Pg. 659 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation STATE OF GALIFORNIA• DEPARTMENT QF TRANSPQRTRTIt?
N
NQTICE OF MATERIALS TO BE USEL1
CEM- 3101 ( REV D8l2019)

NOTICE OF MATERIALS TO BE USED
INSI' RUCTIaNS TG! ONTRACTOR
Section6 of th Standard Specifications states that,"B fare the preconstruction conf rence, submit material source information on a Natice of Materials to Be Used fiorm".

In order ta avaid delay in approval of materials, the Department of Transportation must receive, ina timely manner, Farm CEM- 3101," No#ice of Materials to Be Used." When filing this form, piease camply with' the foliowing instructions:

1. The cantraet number and job limits should be tha same as they appear on the special pre visions. 2, The column headed" Contract Bid Item Number" refers to the sequential item number of the contract.

3. The calurrrn headed°' Item Code°' refers ta th number for which the materiai is ta be used. It isa six digit' number. 4, The column headed'° Contract Item Description°' refers to an iterrr description af the materia[ as described in the special provisions.

5. The column headed" Item Component" refers to the specific descriptian of material to tae used, not necessarily the name of the contract itam.

Far Example°
Contract Contraet
Bid Item Item Item Item
Number Cade Description Companent
01 520' 109 Bar reinforcing s#eel Goupler( service splice)

6. The calumn headed" Item Gompanent Quantity" refers to the item component quantity of material being pravided fram the menufactu er/ provider.

7. The column headed" Manufacturer/ Provide" refers to the manufacturerlfabrisator of the item. List the name, address and email address of the ManufacturerlFabricator. Alsa, Jist the name and address of ihe locafion where inspectian wilf occur, ifidifferent from the Manufacturer/ Fabricator.

8. Form GEM- 3101,'" Notiee of Materials to Be Used;" must be submitted to the resident engineer( RE). The RE will email Form CEM- 3101 ta the materials administrator to, MaterialsAdministrattrrMETS( c' dat.ca: ov arfax to( 916) 2Z7- 7084, Attn; Materials Administra#or or pastal mail to: Material Engineering& Testing Services, 5900 Folsam Blvd., Sacramento, GA 95819, MS- 5.

If the souraes of materials are not known at the beginning ofa contract, submita Form CEM- 3101," Notice af Materials t4 Be Used,° fora given bid iterrr as soon asa pravideris known. Multiple submittals may be nec ssary. Resubmita Form CEM- 3101," Notice af Materials to be Used," for all changes ar revisions.

When placing orders for materials that require inspection prior to shipment, be sure ta indicate an your requsst form that state inspectian is required' before shipment.

ADA Nofice This document is availabie in alternative accessible farmats: For moe information, please contactthe Forms Management Unit at( 279) 234- 22& 4, TTY 711,' in wriiing at Forms Management Unit, 1120
N Street, MS- 89, Sacramento, CA 95814, orby email at Forms. Management.Unit@dot: ca.gov.

APPROVED
Packet Pg. 660 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation STATE OF CALIFORNIA• DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS
ENCROACHMENT PERMIT GENERAL PROVISION5
TR- 0045 ( REV. 12/ 2022)

1. AUTHORITY: The California Department of to be performed under this encroachment permit and/ or Transportation (" Department") has authority to issue under color of authority of this encroachment permit. encroachment permits under Division 1, Chapter 3, Permittee understands and agrees the Permit Conditions A ticle 1, Sections 660 through 734 of the Streets and are applicable to and enforceabie against Permittee as Highways Code. long as the encroachment remains in, under, or over any

2. REVOCATION: Encroachment permits are revocable on part of the State highway right- of-way. The Permittee' s
five ( 5) business days' notice unless otherwise stated on authorized contractors andlor agents, are also bound by the permit or otherwise provided by law, and except as the Permit Conditions. Non- compliance with the Permit provided by law for public corporations, franchise holders, Conditions by the Permittee' s authorized contractor
and utilities. Notwithstanding the foregoing, in an andlor agent will be deemed non- compliance by the emergency situation as determined by the Department, Permittee. an encroachment permit may be revoked immediately. 6. BEGINNING OF WORK: When traffic is not impacted These General Provisions and any appticable Speciai see General Provision Number 35), the Permittee must Provisions are subject to modification or abrogation by the notify the DepartmenYs representative two ( 2) business Department at any time. Permittees' joint use days before starting permitted work. Permittee must notify agreements, franchise rights, reserved rights or any other the Department' s representative if the work is to be
agreements for operating purposes in State of California interrupted for a period of five( 5) business days or more,
State") highway right- of-way may be exceptions to this unless othenrvise agreed upon. All work must be revocation. performed on weekdays during regular work hours,

3. DENIAL FOR NONPAYMENT OF FEES: Failure to pay excluding holidays, unless otherwise specified in this encroachment permit fees when due may result in encroachment permit. rejection of future applications, denial of encroachment 7. STANDARDS OF CONSTRUCTION: All work performed permits, and revocation of the encroachment permit if within State highway right- of-way must conform to all aiready issued. applicable Departmentai construction standards including

4. PERMITTEE AUTHORIZATION FOR OTHERS TO but not limited to: Standard Specifications, Standard PERFORM WORK: This encroachment permit allows Plans, Project Development Procedures Manual, only the Permittee andlor Permittee'
s authorized Highway Design Manuai and Speciai Provisions. contractor or agent to work within or encroach upon the Other than as expressly provided by these General State highway right-of-way, and the Permittee may not Provisions, the Special Provisions, the Standard assign or transfer this encroachment permit. Any attempt Specifications, Standard Plans, and other applicable to assign or transfer this encroachment permit shall be Departmental standards, nothing in these General null and void. Permittee shall provide to the Department a Provisions is intended to give any third party any legal or list of Permittee'
s authorized contractors/ agents, in the equitable right, remedy, or ciaim with respect to the form and at the time specified by the Department but if no encroachment permit and/or to these General Provisions time is specified then no later than the pre- construction or any provision herein. These General Provisions are for meeting. Permittee shall keep the list current and shall the sole and exclusive bene t of the Permittee and the
provide updates to the Department immediately upon any Department. change to the list of authorized contractorsJagents, Where reference is made in such standards to including but not limited the addition, removal, or Contractor" and " Engineer," these are amended to be substitution of an authorized contractor/ agent, or
a new read as " Permittee" and " DepartmenYs representative," address or contact information for an existing authorized respectively, for purposes of this encroachment permit. contractor/ agent. Permittee is responsible for the acts 8. PLAN CHANGES: Deviations from plans, specifications, and/ or omissions of any person or entity acting on behalf andlor the Permit Conditions as defined in General of the Permittee, even if such person or entity is not Provision Number 5 are not allowed without prior approval
included on Permittee'
s list of authorized contractors from the DepartmenYs representative and the Federal and/ or agents. Highway Administration (" FHWA") representative if

5. ACCEPTANCE OF PROVISIONS: Permittee, and the applicable.

Permittee'
s authorized contractors and/ or agents, 9. RIGHT OF ENTRY, INSPECTION AND APPROVAL: Ail understand and agree to accept and comply with these work is subject to monitoring and inspection. The United General Provisions, the Special Provisions, any and all States, the State, the Department, and the Directors, terms and/ or conditions contained in or incorporated into officers, employees, agents, and/ or contractors of the the encroachment permit, and all attachments to the State and/or of the Department, and other state, and encroachment permit ( collectively " the Permit federal agencies, and the FHWA, through their agents or Conditions"), for any encroachment, work, and/ or activity representatives, must have full access to highway Page1 of6
O 2018 Califomia Department of Transportation. All rights reserved.

APPROVED
Packet Pg. 661 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation STATE OF CAIIFORNIA• DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS
facilities/ encroachment area, at any and all times for the pedestrians to facilities across the street. Attention is purpose of inspection, maintenance, activities needed for directed to Section 7- 1. 04" Public Safety," and to Section construction/ reconstruction, and operation of the State 12- 4. 04 " Temporary Pedestrian Access Routes," and to highway right- of-way. Section 16- 2. 02 " Temporary Pedestrian Facility," of the Upon completion of work, Permittee must request
a Department'
s Standard Specifications, and to California
final inspection for acceptance and approval by the Vehicle Code section 21760, subdivision( c).

Department. The locai public agency Permittee must not 14. PUBLIC TRAFFIC CONTROL: The Permittee must give final construction approval to its contractor until nal provide traffic control protection, warning signs, lights, acceptance and approval by the Departme
t is obtained, safety devices, etc., and take ail other measures

10. PERMIT AT WORKSITE: Permittee and Permittee'
s necessary for the traveling public'
s safety as required by
authorized contractors/ agents must keep the permit law and/ or the Department. While providing traffic control, package and cu rent list of authorized contractors/ agents, the needs of all road users, including but not limited to or copies thereof, at the work site at all times and must motorists, bicyclists and pedestrians, including persons show such documents upon request to any Department with disabilities in accordance with the Americans with representative or law enforcement officer. If the permit Disabilities Act, must be an essentiai part of the work package or current list of authorized contractorslagents, activity. or copies thereaf, are not kept and made available at the Lane, Bike Lane, Sidewalk, Crosswalk, and/ or work site at ail times, then aii work must be suspended. shoulder closures must comply with the DepartmenYs

11. CONFLICTING ENCROACHMENTS: Permittee must Standard Specifications and Standard Plans for yieid start of work to ongoing, prior authorized work Temporary Traffic Control Systems & Temporary adjacent to or within the limits of the Permittee'
s project Pedestrian Access Routes, and with the applicable site. When existing encroachments conflict with Special Provisions. Where issues are not addressed in Permittee'
s work, the Permittee must bear all cost for the Standard Specifications, Standard Plans, and/ or rearrangements ( e. g., relocation, alteration, removai, Special Provisions, the California Manual on Uniform etc.). Traffic Controt Devices( Part 6, Temporary Traffic Control)

12. PERMITS, APPROVA S, AND CONCURRENCES must be foliowed.

FROM OTHER AGENCIES AND/ OR ENTITIES: This 15. MINIMUM INTERFERENCE WITH TRAFFIC: Permittee encroachment permit is invalidated if the Permittee has must plan and conduct work so as to create the least not obtained all permits, approvais, and concurrences possible inconvenience to the traveling public ( motorized necessary and required by law, including but not limited vehicles, unmotorized vehicles such as bicycles, to those from the California Public Utilities Commission pedestrians, person( s) with disabilities, etc.), such that CPUC'), California Occupational Safety and Health traffic is not unreasonably delayed.

Administration (" Cal- OSHA"), local and state and federal 16. STORAGE OF EQUIPMENT AND MATERIALS: The environmentai agencies, the California Coastal storage of equipment or materials is not allowed within Commission, and any other public agency and/ or entity State highway right- of-way, unless specified within the having jurisdiction. Permittee is responsible for providing Special Provisions of this encroachment permit. If notice of the encroachment to, and obtaining concurrence encroachment permit Special Provisions allow for the from, any person or entity ( whether pubiic or private) storage of equipment or materials within the State affected by the scope of work described in the highway right- of-way, the equipment and material storage encroachment permit, regardless of whether such notice must also comply with Section 7- 1. 04, Public Safety, of or concurrence is required by law; the Department is not the Department' s Standard Specifications.
responsible to provide such notice or obtain such 17. CARE OF DRAINAGE: Permittee must provide alternate concurrence. Permittee warrants all such permits, drainage for any work interfering with an existing drainage approvals, and concurrences have been obtained before facility in compliance with the Department' s Standard
beginning work under this encroachment permit. The Specifications, Standard Plans, and/or as directed by the Department may, at the DepartmenYs discretion, require Department' s representative.
the Permittee to demonstrate that Permittee has obtained 18. RESTORATION AND REPAIRS IN STATE HIGHWAY all such permits, approvals, and concurrences, and RIGHT-OF-WAY: Permittee is responsible for restoration Permittee shall demonstrate this at the time and in the and repair of State highway right- of-way resulting from manner specified by the Qepartment. permitted work( Streets and Highways Gode, section 670

13. PEDESTRIAN AND BICYCLIST SAFETY:

A safe et seq.).
continuous passageway must be maintained through the 19. STATE HIGHWAY RIGHT- OF- WAY CLEAN UP: Upon work area at existing pedestrian or bicycle facilities. At no completion of work, Permittee must remove and dispose time must pedestrians be diverted onto
a portion of the of all scraps, refuse, brush, timber, materials, etc. off the street used for vehicular tra c. At locations where safe State highway right-of-way, The aesthetics of the highway alternate passageways cannot be provided, appropriate must be as it was before work started or better. signs and barricades must be installed at the limits of 20. COST OF WORK: Unless stated otherwise in the construction and in advance of the limits of construction encroachment permit or a separate written agreement
at the nearest crosswalk or intersection to detour with the Department, the Permittee must bear all costs Page2 of6
O 2018 California Department of Transportation. All rights reserved.

APPROVED
Packet Pg. 662 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation

STATE OF CAIIFORNIA DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS
incurred for work within the State highway right- of-way Notice and Record Purposes Only" must be stamped and waives all claims for indemnification or contribution across the face of the encroachment permit. from the United States, the State, the Depattment, and 24. BONDING: The Permittee must file bond( s), in advance, from the Directors, officers, and employees of the State in the amount( s) set by the Department and using forms and/ or the Department. Removal of Permittee'
s personal acceptabie to the Department. The bonds must name the property and improvements shall be at no cost to the Department as obligee. Failure to maintain bond( s) in full United States, the State, and the Department. fo ce and effect will result in the Department stopping all

21. ACTUAL COST BILLING: When specified in the permit, work under this encroachment permit and possibiy the Department will bill the Permittee actual costs at the revoking other encroachment permit(s). Bonds are not currently set Standard Hourly Rate for encroachment required of public corporations or privately-owned utilities permits. unless Permittee failed to comply with the provisions

22. AS- BUILT PLANS: When required, Permittee must and/ or conditions of a prior encroachment permit. The
submit one( 1) set of folded as- built plans within thirty( 30) surety company is responsible for any latent defects as calendar days after compietion and acceptance of work in provided in California Code of Civil Procedure section compliance with requirements listed as foliows: 337. 15.

A local public agency Permittee also must comply
a) Upon completion of the work provided herein, the with the following requirements:

Permittee must submit
a paper set of As- Built plans a) In recognition that project construction work done on to the DepartmenYs representative. State property will not be directly funded and paid by b) All changes in the work will be shown on the plans, as State, for the purpose of protecting stop notice issued with the permit, including changes approved claimants and the interests of State relative to by Encroachment Permit Rider. successful project completion, the locai public agency c) The plans are to be prominently stamped or otherwise Permittee agrees to require the construction noted " AS- BUILT" by the Permittee'
s representative contractor to furnish both
a payment and performance
who was responsible for overseeing the work. Any bond in the local public agency' s name with both
original plan that was approved with
a Department bonds complying with the requirements set forth in stamp, or by signature of the DepartmenYs Section 3- 1. 05 Contract Bonds of the Department' s
representative, must be used for producing the As- Standard Specifications before performing any Built plans. project construction work.
d) If construction plans include signing or striping, the b) The local public agency Permittee must defend, dates of signing or striping removal, relocation, or indemnify, and hold harmless the United States, the installation must be shown on the As- Built plans when State and# he Department, and the Directors, officers, required asa condition of the encroachment permit. and employees of the State and/ or Department, from When the construction plans show signing and all project construction related claims by contractors, striping for staged construction on separate sheets, subcontractors, and suppliers, and from all stop the sheet for each stage must show the removal, notice and/ or mechanic' s lien ciaimants. The local
relocation, and installation dates of the appropriate public agency also agrees to remedy, in a timely
staged striping and signing. manner and to the Department' s satisfaction, any
e) As- Built plans must contain the Encroachment Pe mit latent defects occurring as a esult of the project Number, County, Route, and Post Mile on each construction work. sheet. 25. FUTURE MOVING OF INSTAL ATIONS: Permittee
fl The As- Built Plans must not include
a disclaimer understands and agrees to relocate
a permitted
statement of any kind that differs from the obligations installation upon notice by the Department. Unless under and protections provided by sections 6735 through prior property right or agreement, the Permittee must 6735.
6 of the California Business and Professions comply with said notice at the Permittee' s sole expense.

Code. Such statements constitute non- compliance 26. ENVIRONMENTAL:
with Encroachment Permit requirements and may a) ARCHAEOLOGICAUHISTORICAL: If any result in the Department retaining Performance archaeological or historical resources are identified or Bonds or deposits until proper plans are submitted. encountered in the work vicinity, the Permittee must Failure to comply may also result in denial of future immediately stop work, notify the DepartmenYs encroachment permits or
a provision requiring
a representative, retain
a qualified archaeologist who
public agency to supply additional bonding. must evaluate the site at Permittee' s sote expense,

23. PERMITS FOR RECORD PURPOSES ONLY: When and make recommendations to the DepartmenYs work in the State highway right-of-way is within an area representative regarding the continuance of work. undera Joint Use Agreement ( JUA} or
a Consent to b) HAZARDOUS MATERIALS: If any hazardous waste Common Use Agreement ( CCUA},
a fee exempt or materials ( such as underground storage tanks, encroachment permit is issued to the Permittee for the asbestos pipes, contaminated soil, etc.) are identified purpose of providinga notice and record of work. The or encountered in the work vicinity, the Permittee Permittee'
s prior rights must be preserved without the must immediately stop work, notify the Department' s
intention af creating new or different rights or obligations. representative, retain a qualified hazardous
Page3 of6
O 2018 California Departmen[ of Transportation. All rights reserved.

APPROVED
Packet Pg. 663 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation STATE OF CALIFORNIA• DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS
waste/ material specialist who must evaluate the site property, including but not limited to the features or at the Permittee'
s sole expense, and make conditions of either of them, made by the Permittee or recommendations to the Department'
s representative anyone acting on behalf of the Permittee; and/ or { fl a
regarding the continuance of work. defect or obstruction related to or caused by the Attention is directed to potential aerially deposited encroachment, work, and/ or activity whether conducted in lead ( ADL) presence in unpaved areas along compliance with the Permit Conditions as defined in highways. it is the Permittee'
s
responsibility to take all General Provision Number
5 or constituting Unauthorized
appropriate measures to protect workers in Work or Activity, or from any cause whatsoever. The duty conformance with California Code of Regulations of the Permittee to indemnify and save harmless includes Title 8, Section 1532. 1, " ead," and with Cal- OSHA the duties to defend as set forth in Section 2778 of the Construction Safety Orders, and to ensure roadway Civil Code. soil management is in compliance with Department of It is the intent of the Department and the Permittee Toxic Substances Control( DTSC) requirements. that except as prohibited by law, the Permittee wili defend, c) BIOLOGICAL: if any regional, state, or federally listed indemnify, and hold harmless as set forth in this General biological resource is identified or encountered in the Provision Number 28 regardless of the existence or work vicinity, the Permittee must immediately stop degree of fault or negligence, whether active or passive, work, notify the DepartmenYs representative, retain
a primary or secondary, on the part of: the United States, qualified biotogist who must evaluate the site at the State; the Department; the Directors, officers, Permittee's sole expense, and make employees, agents and/ or contractors of the State and/ or recommendations to the DepartmenYs representative of the Department, including but not limited to the Director regarding the continuance of work. of Transportation and the Deputy Directors; the Permittee;

27. PREVAILING WAGES: Work performed by or under an persons employed by the Permittee; and/ or persons encroachment permit may require Permittee'
s contractors acting on behalf of the Permittee.
and subcontractors to pay appropriate prevailing wages The Permittee waives any and ail rights to any type of as set by the California Department of Industrial expressed or implied indemnity from or against the United Relations. Inquiries or requests for interpretations relative States, the State, the Department, and the Directors, to enforcement of prevailing wage requirements must be
o cers, employees, agents, and/ or contractors of the
directed to the California Department of Industrial State and/ or of the Department, including but not limited Relations. to the Director of Transportation and the Deputy Directors.

28. LIABILITY, DEFENSE, AND INDEMNITY: The Permittee The Permittee understands and agrees to compiy agrees to indemnify and save harmless the United States, with the obligations of Titles II and III of the Americans the State, the Department, and the Directors, officers, with Disabilities Act in the conduct of the encroachment, employees, agents and/ or contractors of the State and/ or work, and/ or activity whether conducted pursuant to this of the Department, including but not limited to the Director encroachment permit or constituting Unauthorized Work of Transportation and the Deputy Directors, from any
ad or Activity, and further agrees to defend, indemnify, and all claims, demands, damages, costs, liability, suits, or save harmiess the United States, the State, the actions of every name, kind, and description, including but Department, and the Directors, officers, employees, not limited to those brought for or on account of property agents, and/ or contractors of the State and/ or of the damage, invasion of privacy, violation or deprivation of a Department, including but not limited to the Director of right under
a state or federal law, environmental damage Transportation and the Deputy Directors, from any and all or penalty, or injury to or death of any person including claims, demands, damages, costs, penalties, liability, but not limited to members of the public, the Permittee, suits, or actions of every name, kind, and description persons employed by the Permittee, and/ or persons arising out of or by virtue of the Americans with Disabilities acting on behalf of the Permittee, arising out of or in Act. connection with: ( a) the issuance and/ or use of this The Permittee understands and agrees the Directors, encroachment permit; and/ or( b) the encroachment, work, officers, employees, agents, and/ or contractors of the and/ or activity conducted pursuant to this encroachment State and/or of the Department, including but not limited permit, or under color of authority of this encroachment to the Director of Transportation and the Deputy Directors, permit but not in full compliance with the Permit are not personally responsible for any liability arising from Conditions as defined in General Provision Number
5 or by virtue of this encroachment permit.

Unauthorized Work or Activity"); and/ or ( c) the For the purpose of this General Provision Number 28 installation, placement, design, existence, operation, and all paragraphs herein," contractors of the State andJor and/ or maintenance of the encroachment, work, and/ or of the DepartmenY' includes contractors, and their activity; and/ or ( d) the failure by the Permittee, or by subcontractors, under contract to the State and/ or the anyone acting for or on behalf of the Permittee, to perform Department. the Permittee's obligations under any part of the Permit This General Provision Number 28 and all Conditions as defined in General Provision Number 5, in paragraphs herein take effect immediately upon issuance respect to maintenance or any other obligation; and/ or( e) of this encroachment permit, and apply before, during, any change to the DepartmenYs property or adjacent and after the encro chment, work, and/ or activity Page4 of6
O 2018 Califomia DepaRment of Transportation. All rights reserved.

APPROVED
Packet Pg. 664 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation STATE OF CALIFORNIA• DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS
contemplated under this encroachment permit, whether Regulations, Commerce and Foreign Trade, such work is in compliance with the Permit Conditions as Subtitle A. Office of the Secretary of Commerce, defined in General Provision Number
5 or constitutes Part 8( 15 C. F. R. Part 8) and as said Regulations Unauthorized Work or Activity, except as otherwise may be amended. provided by California law. The Permittee'
s obligations to b) That in the event of breach of any of the above defend, indemnify, and save harmless underthis Generai nondiscrimination covenants, the State and the Provision Number 28 take effect immediately upon Department have the right to terminate this issuance of this encroachment permit and have no encroachment permit and to re-enter and repossess expiration date, including but not limited to situations in said land and the facilities thereon and hold the same which this encroachment permit expires or is revoked, the as if said permit had never been made or issued. work or activity performed under this encroachment 31. MAINTENANCE: The Permittee is responsible at permit is accepted or not accepted by the Department, the Permittee' s sole expense for the encroachment, and the
encroachment, work, and/ or activity is conducted in inspection, maintenance, repair, and condition thereof, compliance with the Permit Conditions as defined in and is responsible to ensure the encroachment does not General Provision Number
5 or constitutes Unauthorized negatively impact State highway safety, maintenance, Work or Activity, and/ or no work or activity is undertaken operations, construction, State facilities, activities related by the Permittee or by others on the Permittee'
s behaif. to construction/ reconstruction, or other encroachments.

If the United States or an agency, department, or The Permittee' s obligations in the preceding sentence
board of the United States is the Permitfee, the first two take effect immediately upon issuance of this paragraphs of this General Provision Number 28 encroachment permit and continue until the beginning " The Permittee agrees to indemnify..." and " It encroachment is entirely and permanently removed. is the intent of the parties..."} are replaced by the following Additional encroachment permits or approval documents paragraph: may be required authorizing work related to inspection, Ciaims for personal injury, death, or property damage repair, and/ or maintenance activities. Contact the aliegedly caused by the negligent or wrongful act or Department for information. omission of any employee of the United States acting 32. SPECIAL EVENTS: In accordance with subdivision( a) of within the scope of their official duties are subject to the Streets and Highways Code section 682. 5 and 682. 7, the
Federal Tort Claims Act, as amended, 28 U. S. C. § 1346 Department is not responsible for the conduct or and § 2671 et seq. ( Chapter 171). operation of the permitted activity, and the applicant

29. NO PRECEDENT ESTABLISHED: This encroachment agrees to defend, indemnify, and hold harmless the permit is issued with the understanding that it does not United States, the State, the Department, and the establisha precedent. Directors, officers, employees, agents, and contractors of

30. FEDERAL CIVIL RIGHTS REQUIREMENTS FOR the State and/ or of the Department, including but not PUBLIC ACCOMMODATION: limited to the Director of Transpo tation and the Deputy a) As part of the consideration for being issued this Directors, from any and all claims, demands, damages, encroachment permit, the Permittee, on behalf of costs, liability, suits, or actions of every name, kind and Permittee and on behalf of Permittee'
s personal description arising out of any activity for which this representatives, successors in interest, and assigns, encroachment permit is issued. does hereby covenant and agree that: The Permittee is required, as a condition of this
i) No person on the grounds of race, color, or encroachment permit, for any event that awards prize national origin may be excluded from participation compensation to competitors in gendered categories, for in, be denied the benefits of, or be otherwise any participant level that receives prize compensation, to subjected to discrimination in the use of said ensure the prize compensation for each gendered facilities. category is identical at each participant IeveL( Streets and ii) That in connection with the construction of any Highways Code, section 682. 7.) improvements on said lands and the furnishings The Permittee understands and agrees to comply of services thereon, no discrimination must be with the obligations of Titles II and 111 of the Americans practiced in the selection and retention of first- tier with Disabilities Act in the conduct of the event, and subcontractors in the selection of second- tier further agrees to defend, indemnify, and save harmless subcontractors. the United State, the State and the Department, and the iii) That such discrimination must not be practiced Directors, officers, and employees of the State and/ or against the public in their access to and use of the Department, including but not limited to the Director of the facilities and services provided for public Department and the Deputy Directors, from any and all accommodations ( such as eating, sleeping, rest, claims, demands, damages, costs, liability, suits, or recreation), and operation on, over, or under the actions of every name, kind and description arising out of space of the State highway right-of-way, or by virtue of the Americans with Disabilities Act. iv) That the Permittee must use the premises in 33. PRIVATE USE OF STATE HIGHWAY RIGHT- OF- WAY:
compliance with all other requirements imposed State highway right- of-way must not be used for private pursuant to Title 15, Code of Federal purposes without compensation to the State. The gifting Page5 of6
OO 2018 California Department of Transportation. All rights reserved.

APPROVED
Packet Pg. 665 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation STATE OF CALIFORNIA• DEPARTMENT OF TRANSPORTATION

ENCROACHMENT PERMIT GENERAL PROVISIONS
of public property uses and therefore public funds is section 4450 et seq., which require public facilities be prohibited under the California Constitution, Article XVI, made accessible to persons with disabilities.

Section 6. Notwithstanding the requirements of the previous

34. FIELD WORK REIMBURSEMENT: Permittee must paragraph, all construction, design, and maintenance of reimburse the Department for field work performed by or public facilities must also comply with the DepartmenYs on behalf of the Department to correct or remedy issues Design Information Bulletin 82, " Pedestrian Accessibility created by the Permittee or by others acting on behaif of Guidelines for Highway Projects" and Standard Plans & the Permittee, including but not limited to hazards or Specifications on " Temporary Pedestrian Access damaged facilities, or to clear refuse, debris, etc. not Routes." attended to by the Permittee or by others acting on behalf 39. STORMWATER: The Permittee is responsible for full of the Permittee. compliance with the following:

35. LANE CLOSURE REQUEST SUBMITTA
S AND a) For ali projects, the DepartmenYs Storm Water
NOTIFICATION OF CLOSURES TO THE Program and the DepartmenYs National Pollutant DEPARTMENT: Lane closure request submittals and Discharge Elimination System ( NPDES) Permit notifications must be in accordance with Section 12- 4. 02, requirements under Order No. 2012- 0011- DWQ, and Section 12. 4- 04, of the DepartmenYs Standard NPDES No CAS000003; and Specifications or as directed by the DepartmenYs b) In addition, for projects disturbing one acre or more representative. The Permittee must notify the of soil, with the California Construction General Department's representative and the Traffic Management Permit Order No. 2009- 0009- DWQ, NPDES No Center (" TMC") before initiating
a lane closure or CAS000002; and
conducting an activity that may cause
a traffic impact. In c) In addition, for projects disturbing one acre or more of emergency situations when the corrective work or the soil in the Lahontan Region with Order No. R6T- 2016- emergency itseif may affect traffic, the DepartmenYs 0010, NPDES No CAG616002. representative and the TMC must be notified as soon as d) For all projects, it is the Permittee' s responsibility to
possible. install, inspect, repair, and maintain aii facilities and

36. SUSPENSION OF TRAFFIC CONTROL OPERATION: devices used for water pollution control practices The Permittee, upon notification by the DepartmenYs Best Management PracticeslBMPs) before representative, must immediately suspend all traffic lane, performing daily work activities. bike lane, sidewalk, crosswalk, and/or shoulder closure operations and any operation that impedes the flow of
tra c. All costs associated with this suspension must be borne by the Permittee.

37. UNDERGROUND SERVICE ALERT ( USA)
NOTIFICATION: Any excavation requires compliance
with the provisions of Govemment Code section 4216 et
seq., including but not limited to notice to
a regional
notification center, such as Underground Service Alert
USA). The Permittee must provide notification to the
Department representative at least five( 5) business days before, and the regional notification center at least fortyeight ( 48) hours before, performing any excavation work within the State highway right- of-way.

38. COMPLIANCE WITH THE AMERICANS WITH
DISABILITIES ACT ( ADA): Ail work within the State
highway right- of-way to construct and/ or maintain any public facility must be designed, maintained, and
constructed strictly in accordance with all applicabie
Federal Access laws and regulations ( including but not limited to Section 504 of the Rehabilitation Act of 1973, codified at 29 U. S. C. § 794), California Access laws and regulations relating to ADA, along with its implementing regulations, Title 28 of the Code of Federal Regulations Parts 35 and 36 ( 28 GF. R., Ch. I, Part 35, § 35. 101 et seq., and Part 36, § 36. 101 et seq.), Titie 36 of the Code of Federal Regulations Part 1191 ( 36 C. F. R., Ch. XI, Part 1191, § 1119.
1 et seq.), Title 49 of the Code of Federal
Regulations Part 37 { 49 C. F. R., Ch. A, Part 37, § 37. 1 et
seq.), the United States Department of Justice Title II and Title III for the ADA, and California Government Code
Page6 of6
O 2018 Califomia Department of TranspoRation. All rights reserved.

APPROVED
Packet Pg. 666 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation STATE OF CALIFQRNIA DEPAftTMENT OF TRANSPORTATION Page
1 of3
ENCRt?ACMMENT PERMIT SPECIAI PROVISIONS
STt RMVVATER SPECIAL PRt' VISIONS FC1R MINIMAL0R NO

I PACT (
S SP)
Tx- oa oo :

V as
al s>

1. GENE L; The purpose cafthese Special Provisions Water Quality Cantrol Board or other regulatory is to provide the Permittee wifh specificaticans for agency must be provided to fhe State representative water pollution control to minimize, prevenf, or within 48 hours of reparted activity, F or additional
control the diseharg af material inta the air, sur aee infarmatian on starmwater compliance, visit the S#ate waters, graundwater; and storm sewers owned by th Water Resources Cantroi Boards storm water State
er Ioc
i agencies. 7hese provisions are not Website at;
intended ta take the piac of the Galtrans Water
Pol( ution Control Program( WPCP) for projects where http; f - waterk c ards. ca. aav/ water issues/ pro ra
soil disturbance from wtark activities Bess than ane mslsfo w ter
acre, or work activities of one cre or more subjecY to
the preparation of the Caltrans Storm Wat
r Pollution . RESFONSIBILITY FQR DIEBRIS REMOVAL: The
Prev ntion Plan { SWPPP). The Permittee must Permitfee must be responsible for prevenfing camply with the following Special Pravisions and the ament, trash, debris; and other construction waste direction of the State Representatiue. All Stormwater
from entering # he street, the storm drains, local
creeks, or any other bodies of wa#er. Best Management Practices( BMPs) must confc rmto 4. SPOILS AND RESIDUE: The Permittee must Section 13 Water Pnllution Contral af Caltrans'
vacuum any savv- cut concrete waste material, debris,
Standard Specifications. residue, tc. 1Vo spoils, debris, residue; etc. must be

2. NPDES F2EQUIREMENTSd The Permittee must be washed into a drainage system:
responsible for full compliance with the Galtrans 5. SWEEPING. Sweep paved roads at canstruction Starm Water Program and the Caltrans National entrance and exit locations and surraunding paved Pollutant Discharge Eliminafiion System ( NPDES} areas daily within the job site during: 1) clearing and Permit requirements ( Order No. 2U92- 0099- DWQ; grubbing, 2) earthwcark, 3) trenching, 4} soil NPt ES No CASOOQ003) and for and arojects disturbance, 5) pavement grinding and/ar cutting, and 6) after observing tracking of material onto ar off the disturbing one acre ar rrtore of soil, full campliance State property. Ke p dust to a minimum during with the California Gonstruction General Permit sweeping activities. Use vacuum whenever dust Order Nn. 2009- 0009- DWQ; NPDES No generation is excessive or sediment pickup is CAS000002) or far projects for projects that have one ineffective. acre or mare of soil disturbance in the Lahontan Roadways orwork areas mus# not be washed down Regian ( rder No.
f 6T- 2016- 0010; NPQES No with water. Street sweeping
o aerations must conform
CAG616002). It is the Permittae°
s
respansibility tc ta Sectic
n 13 Water Pollution Cantrol of Cal# ans'
install, inspect, and repair or
m intain facilities and
tanderd Specifications:
d vices used for water pollution cantrol practices
s. VEHIGLES AND EQUIPMENT: Permittee must
BMPs before
prevent all vehicles, equipment, etc. fram leakage or
performing daily work activities. mud tracking ontv roadways. If leaks cannot be Installation, inspection and maintenance repaired immediately, remove the vehicle or responsibilities on the job site include: 1} sc il equipment f om the job site.
stabilization materiaJs in wark areas that are inactive 7. MAINTENANCE ANQ FUELIN t7F VEHIGLES or prior to starm events, 2) water pallution contral AND EQUIPMENT: Maintenance and fueling of devices ta control sediment and erosian; 3) quipment must nat result in any pollutian at the job irrrplementation af spill and leak prevenfion
site. The Permittee must immediately clean up
procedures far ch mical and hazardaus substances pallslleaks, and properly dispose af contaminated soil stored an the job site; 4) material storage,
5 stock ile
and ma# rials.

8. CLEANING VEHICLES A`ND EQUIPMENT:

L rrrit
management; 6) waste management, 7) non- vehi le and quipment cleaning or washing at the job starmwater management, 8) water ctrnservatian, 9) site except what is necessary to contral vehicle tracking controls and ' i Q) illicit connection, illegal tracking r hazardous waste: The Permittee must
discharg detection and reparting. The Permittee clean all equipment within a bermed area carc vera drip
must repart to the State representative when pan large enough ta prevent run- off. No saaps, diseharges enter into
r ceiving waters, adjacent solvents, degreasers, etc> must be used in State rightproperty, drainage systems or when discharges could a- way. Any water from this aperation must be
be
a cause or
a threat for water poilution. The
coll cted and disposed of at an appropriate site.

Containment berms or dikes must be used for fueling,
P rmittee must also contral illicit discharg
s or illegal W, hing, maintaining and washing vehicies or dumping prior to start of daily work schedule: equipment in autside areas. Gantainment must be Copies of written notices or orders from the Regional performed at least 100 feet from concentrated flows of

APPROVED
Packet Pg. 667 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Page
2 of3

ENCROAGHMENT PERMIT SPECIAL PROVISIONS
storm water, drainage courses, and storm drain inlets disturbance to existing vegetation. Damaged or if within
a flood plain, otherwise at least 50 feet if removed vegetation must be replaced as directed by outside the floodplain. Keep adequate quantities of the State Representative. absorbent spill- cleanup material and spill kits in the 18. SOIL DISTURBANCE: Soil disturbing activities must fueling or maintenance area and on fueling trucks. be avoided during the wet weather season. I f

9. DIESE FUELS: The use of diesel fuel from construction activities during wet weather are allowed petroleum or other fossil fuel as
a form- oil or solvent in your permit, all necessary erosion control and soil is not allowed. stabilization measures must be implemented in

10. WEATHER CONDITIONS AT WORKSITE: Any advance of soil disturbing activity. activity that would generate fine particles or dust that 19. SLOPE STABILIZATION AND SEDIMENT could be transported off site by stormwater must be CONTROL: Consider a certified expet in Erosion and
performed during dry weather. Sediment control in cases where slopes are disturbed

11. WIND EROSION PROTECTION: The use of Wind during construction. The Permittee is directed to Erosion BMPs must be deployed year- round in comply with Section 13. 5 Temporary Soil Stabilization
instances where dust or flne pa ticles could be and Section 21 Erosion Control of Caltrans' Standard transported off site. Specifications during application of temporary soil

12. HOT MIX ASPHALT: Runoff from washing hot mix stabilization measures to the soil surface. Fiber rolls or asphalt must not enter into any drainage silt fences may be required down slope until permanent conveyances. soil stabilization is established. Remove the

13. PROTECTION OF DRAINAGE FACILITIES: The accumulated sediment whenever the sediment Permittee must protect/ cover gutters, ditches, accumulates to 113 of the linear sediment barrier drainage courses, and inlets with gravel bags, fiber height. The Permittee must limit the use of plastic rolls, State approved fabric filters, etc., to the materials when more sustainable, environmentally satisfaction of the State representative during grading, friendly alternatives exist or when environmental paving, saw- cutting, etc. and materials must conform regulations prohibit their use within the project. to Section 13- 6. 02 Materials for Water Pollution 20. STOCKPILES: Stockpiles containing aggregate Control of Caltrans' Standard Specifications. No such and/ or soil must be stored at least 100 feet from protection measures must cause an obstruction to the ' concentrated flows of storm water, drainage courses, traveling public. The Permittee must implement spill and storm drain iniets if within a flood plain, otherwise
and leak prevention procedures for chemicals and at least 50 feet if outside the floodplain, and must be hazardous substances stored on thejob site( including covered and protected with a temporary perimeter
secondary containment requirements) in accordance sediment barrier. Cold mix stockpiles must be stored with section 13- 4. 03B Spill Prevention and Control, on an impermeable surface and covered with 9 mil
and 14- 11 Hazardous Waste and Contamination, plastic to prevent contact with water. Minimize Water Pollution Control of Caltrans' Standard stockpiling of materials on the job site. Manage Specifications. stockpiles by implementing the water pollution control

14. PAINT: Rinsing of painting equipment and materials practices in Section 13- 4. 03C( 3) Stockpile is not permitted in State right- of-way. When thoroughly Management of the State of California standard dry, dispose of the following as solid waste: dry latex specifications for construction. paint, paint cans, used brushes, rags, gloves, 21. DISCOVERY OF CONTAMINATION: The State absorbent materials, and drop cloths. Oil based paint Representative must be notified in case any unusual sludge and unusable thinner must be disposed of at an discoloration, odor, or texture of ground water, is found approved hazardous waste site. in excavated material or if abandoned, underground

15. CONSTRUCTION MATERIALS: Stockpile of all tanks, pipes, or buried debris are encountered. construction materials, including, but not limited to; 22. SANITARY AND SEPTIC WASTE: Do not bury or pressure treated wood, asphalt concrete, cold mix discharge wastewater from a sanitary or septic system
asphalt concrete, concrete, grout, cement containing within the highway. Properly connected sewer facilities premixes, and mortar, must conform to section are free from leaks. With State Representative 13- 4. Q3C{ 2) Material Storage & 13- 4, 03C( 3) approval place portable sanitary facility at least 50 feet Stockpile Management of Caltrans' Standard away from storm drains, receiving waters, and flow Specifications. lines. Permittee must comply with local health agency

16. CONCRETE EQUIPMENT: Concrete equipment provisions when using an on- site disposal system. must be washed in
a designated washing area in
a way 23. LIQUID WASTE: Prevent job site liquid waste from that does not contaminate soil, receiving waters, or entering storm drain systems and receiving waters. storm drain systems. Drilling slurries, grease or oil-free waste water or rinse

17. EXISTING VEGETATION: Established existing water, dredging, wash water or rinse water running off vegetation is the best form of erosion control. Minimize a surface or other non- storm water liquids not covered

APPROVED
Packet Pg. 668 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Page
3 of3

ENCROACHMENT PERMIT SPECIAL PROVISIONS
under separate waste water permits must be held in
structurally sound, leak- proof containers, such as
portabie bins or portable tanks. Store containers at
least 50 feet away from moving vehicles and
equipment. Liquid waste may require testing to
determine hazardous material content prior to
disposal. All measures must conform to section
13- 4. 03D( 5) Liquid Waste, Water Pollution Control of Caltrans' Standard Specifications.

24. WATER CONTROL AND CONSERVATION:

Manage water use inaw ay that will prevent erosion
and the discharge of pollutants into storm drain
systems and receiving waters. Direct runoff, including
water from water line repair from the job site to areas where it can infiltrate into the ground. Direct water from off-site sources around the job site or from contact with jobsite runoff.

25. PILE DRIVING: Keep spill kits and cleanup materials at pile driving locations. Park pile driving equipment
over drip pans, absorbent pads, or plastic sheeting with absorbent material, and away from stormwater run- on
when not in use.

26. DEWATERING: Dewatering consists of discharging
accumulated storm water, groundwater, or surface
water from excavations or temporary containment
facilities. All dewatering operations must comply with
the latest Caltrans guidelines including the Field Guide for Construction Site Dewatering. Contact State
representative for approval of dewatering discharge by
infiltration or evaporation, otherwise, any effluent
discharged intoa permitted storm water system
requires approval from the Regional Water Quality
Control Board. Prior to the start of dewatering, the
Permittee must provide the State Representative with a dewatering and discharge work plan that complies with section 13- 4. 03G Dewatering, Water Poilution
Control of Caltrans' Standard Specifications.A copy of
the Waste Discharge Permit anda copy ofa valid
WDID number issued by the Regional Board must be
provided to the State representative.

APPROVED
Packet Pg. 669 Attachment: Previous Staff Report - April 16, 2024, item no. 4.11(a) - Contingency Increase (4.11(c)--Project Acceptance, Bid Negotiation

CITY OF REDDING

REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following actions relative to Bid Negotiation No. 5400, Trinity Street Bikeway Project:
(1) Award to S.T. Rhoades Inc., in the amount of $1,615,736.40; (2) Approve an additional $183,500 to cover the cost of administration and inspection fees; (3) Approve $310,000 for project development costs;
(4) Approve $205,000 to provide construction contingency funding; (5) Authorize the City Manager to approve additional increases in either the construction management or construction contingency amounts up to a total of $50,000; (6) Approve the project design plans, specifications and special provisions; and (7) Find that the Project is categorically exempt from the California Environmental Quality Act per Section 15301 – Existing Facilities and Section 15302 – Replacement or Reconstruction.

Fiscal Impact
The Trinity Street Bikeway Project (Project) is being funded by the Affordable Housing and Sustainable Communities (AHSC) Grant associated with the Downtown Block 7 Project.

Cost Summary
Item Estimated
Project Development Costs $310,000
Construction Contract + Contingency $1,820,736.40
Contract Administration, Inspection, Testing $183,500
Additional City Manager Authority $50,000
Total Project Costs $2,364,236.40
Project Budget $2,709,220
MEETING DATE: October 2, 2023
ITEM NO. 4.11(c)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(c)--Award BN No. 5400 Trinity Street Bikeway Project Chuck Aukland, Public
Works Director

APPROVED
Packet Pg. 670 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid Report to Redding City Council September 25, 2023
Re: 4.11(c)--Award BN No. 5400 Trinity Street Bikeway Project Page 2 Project cost components are estimates and some shifting of the project development, construction management, and construction contingency funds may be necessary to balance the project within the approved budget.

Alternative Action
The City Council (Council) may choose not to award the bid for the project and provide staff with alternate direction. If the project is not awarded, there will be a gap within the existing bicycle network between Center Street and Turtle Bay. In addition, AHSC grant funds will not be used and may need to be returned to the state.

Background/Analysis
Attached is a tabulation of bids received and opened on September 12, 2023, for the project. The low bid in the amount of $1,615,736.40 was received from S.T. Rhoades Construction, Inc., of Redding, California. The engineer's estimate was $1,593,538.00. Total project development costs for this project are estimated to be $310,000. Project development costs include engineering, surveying, right-of-way, environmental, consultant services, and permit fees.

The purpose of this project is to provide an east-west bicycle and pedestrian connection through downtown Redding. This project will connect the existing cycle track on Center Street to Sundial Bridge Drive. This project includes the construction of a two-way cycle track along Trinity, Continental, and Butte Streets, ADA curb ramps and signage. The project will relocate the traffic signal at the northwest corner of Market and Trinity Streets and will update the signal at this location to accommodate bicycle traffic. New street lights will be installed along the new cycle track route.

Environmental Review
Staff has determined that the project qualifies as categorically exempt from environmental review under California Environmental Quality Act Guidelines Section 15301 – Existing Facilities and Section 15302 - Replacement or Reconstruction. Class 1 exemptions include the operation, repair and alteration of existing structures and facilities including the installation of bicycle lanes. Class 2 exemptions consist of replacement or reconstruction where the new structure will be located on the same site and will have substantially the same purpose and capacity. The project will add bicycle facilities within the existing right of way. The facility will have the same purpose and capacity and will result in negligible expansion of use, as new vehicle lanes are not proposed. The project has been reviewed for sensitive resources such as threatened or endangered species or their habitats, sensitive vegetation communities, tribal lands, or tribal cultural resources. The project has no potential to have a significant effect on the environment.

Council Priority/City Manager Goals
This agenda item is a routine operational item.

Attachments
^Location Map
^Bid Tabulation
^Notice of Exemption
Plans
Specifications and Special Provisions
Addendum 1

APPROVED
Packet Pg. 671 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 672
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid BID TABULATION FOR:

Trinity Street Bikeway Project
Bid Schedule No.: 5400

ENGINEER'S EST
9/12/2023 UNIT UNIT UNIT

ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 Prepare Water Pollution Control LS 1 $10,000.00 $10,000.00 $900.00 $900.00 $2,000.00 $2,000.00 2 Water Polution Control LS 1 $35,000.00 $35,000.00 $5,000.00 $5,000.00 $7,500.00 $7,500.00 3 Traffic Control LS 1 $100,000.00 $100,000.00 $300,000.00 $300,000.00 $95,000.00 $95,000.00 4 Project Funding Sign LS 1 $3,000.00 $3,000.00 $1,995.00 $1,995.00 $1,500.00 $1,500.00 5 Construction Area Signs EA 42 $650.00 $27,300.00 $262.00 $11,004.00 $500.00 $21,000.00 6 (F) Excavation (Unclassified) CY 185 $100.00 $18,500.00 $100.00 $18,500.00 $220.00 $40,700.00 7 Cold Mill AC SY 2105 $12.00 $25,260.00 $7.00 $14,735.00 $20.00 $42,100.00 8 Microsurface (Type II) SY 33295 $5.00 $166,475.00 $3.65 $121,526.75 $5.00 $166,475.00 9 Asphalt Concrete TON 355 $250.00 $88,750.00 $225.00 $79,875.00 $400.00 $142,000.00 10 Aggregate Base CY 155 $100.00 $15,500.00 $165.00 $25,575.00 $350.00 $54,250.00 11 Cross Gutter SF 520 $75.00 $39,000.00 $80.00 $41,600.00 $45.00 $23,400.00 12 Curb and Gutter LF 135 $150.00 $20,250.00 $140.00 $18,900.00 $80.00 $10,800.00 13 Concrete Curb Ramp SF 665 $50.00 $33,250.00 $60.00 $39,900.00 $38.00 $25,270.00 14 Sidewalk (4" PCC) SF 655 $25.00 $16,375.00 $35.00 $22,925.00 $30.00 $19,650.00 15 Replace Manhole Frame and Cover (SD) EA 5 $200.00 $1,000.00 $1,750.00 $8,750.00 $2,000.00 $10,000.00 16 Replace Manhole Frame and Cover (SS) EA 5 $200.00 $1,000.00 $1,750.00 $8,750.00 $2,000.00 $10,000.00 17 Remove Pavement Marking SF 2215 $5.00 $11,075.00 $8.00 $17,720.00 $9.40 $20,821.00 18 Remove Traffic Stripe (Thermoplastic) LF 17252 $1.00 $17,252.00 $1.20 $20,702.40 $1.70 $29,328.40 19 Pavement Marking (Thermoplastic) SF 7100 $9.00 $63,900.00 $13.00 $92,300.00 $15.00 $106,500.00 20 Pavement Marking (Green Bike) SF 5000 $17.00 $85,000.00 $29.00 $145,000.00 $34.00 $170,000.00 21 Traffic Stripe (4" Thermoplastic) LF 305 $2.00 $610.00 $10.00 $3,050.00 $12.00 $3,660.00 22 Traffic Stripe (6" Thermoplastic) LF 28800 $2.00 $57,600.00 $1.85 $53,280.00 $2.20 $63,360.00 23 Traffic Stripe (8" Thermoplastic) LF 815 $3.00 $2,445.00 $3.55 $2,893.25 $3.75 $3,056.25 24 Pavement Marker EA 1043 $7.00 $7,301.00 $10.00 $10,430.00 $11.00 $11,473.00 25 Install Sign EA 12 $600.00 $7,200.00 $600.00 $7,200.00 $650.00 $7,800.00 26 Remove Sign EA 15 $225.00 $3,375.00 $85.00 $1,275.00 $200.00 $3,000.00 27 Marker Post EA 280 $150.00 $42,000.00 $285.00 $79,800.00 $45.00 $12,600.00 28 Traffic Signal Modifications LS 1 $400,000.00 $400,000.00 $165,000.00 $165,000.00 $400,000.00 $400,000.00 29 Street Light (Standard & LED Luminaire) EA 12 $8,000.00 $96,000.00 $7,500.00 $90,000.00 $10,000.00 $120,000.00 30 Pullbox (2E) EA 10 $1,500.00 $15,000.00 $1,100.00 $11,000.00 $1,200.00 $12,000.00 31 Pullbox (3E) EA 3 $2,000.00 $6,000.00 $2,000.00 $6,000.00 $1,500.00 $4,500.00 32 Conduit (2" PVC) LF 2282 $50.00 $114,100.00 $65.00 $148,330.00 $80.00 $182,560.00 33 Conduit (4" PVC) LF 327 $100.00 $32,700.00 $80.00 $26,160.00 $120.00 $39,240.00 34 Conductor (#6) LF 2610 $12.00 $31,320.00 $6.00 $15,660.00 $3.00 $7,830.00 TOTAL - CONTRACT ITEMS $1,593,538.00 $1,615,736.40 $1,869,373.65 Shaded areas indicate corrections made in accordance with the special provisions.

S.T. Rhoades Construction Inc. Cal Electro Inc.

Page 1 of 2 ends

APPROVED
Packet Pg. 673 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway BID TABULATION FOR:

Trinity Street Bikeway Project
Bid Schedule No.: 5400
9/12/2023

ITEM DESCRIPTION UNIT QTY
1 Prepare Water Pollution Control LS 1
2 Water Polution Control LS 1
3 Traffic Control LS 1
4 Project Funding Sign LS 1
5 Construction Area Signs EA 42
6 (F) Excavation (Unclassified) CY 185
7 Cold Mill AC SY 2105
8 Microsurface (Type II) SY 33295
9 Asphalt Concrete TON 355
10 Aggregate Base CY 155
11 Cross Gutter SF 520
12 Curb and Gutter LF 135
13 Concrete Curb Ramp SF 665
14 Sidewalk (4" PCC) SF 655
15 Replace Manhole Frame and Cover (SD) EA 5
16 Replace Manhole Frame and Cover (SS) EA 5
17 Remove Pavement Marking SF 2215
18 Remove Traffic Stripe (Thermoplastic) LF 17252
19 Pavement Marking (Thermoplastic) SF 7100
20 Pavement Marking (Green Bike) SF 5000
21 Traffic Stripe (4" Thermoplastic) LF 305
22 Traffic Stripe (6" Thermoplastic) LF 28800
23 Traffic Stripe (8" Thermoplastic) LF 815
24 Pavement Marker EA 1043
25 Install Sign EA 12
26 Remove Sign EA 15
27 Marker Post EA 280
28 Traffic Signal Modifications LS 1
29 Street Light (Standard & LED Luminaire) EA 12
30 Pullbox (2E) EA 10
31 Pullbox (3E) EA 3
32 Conduit (2" PVC) LF 2282
33 Conduit (4" PVC) LF 327
34 Conductor (#6) LF 2610

TOTAL - CONTRACT ITEMS
Shaded areas indicate corrections made in accordance w
Average

UNIT UNIT

PRICE TOTAL PRICE
$3,000.00 $3,000.00 $1,966.67
$27,250.00 $27,250.00 $13,250.00
$103,000.00 $103,000.00 $166,000.00
$2,800.00 $2,800.00 $2,098.33
$325.00 $13,650.00 $362.33
$255.00 $47,175.00 $191.67
$12.00 $25,260.00 $13.00
$7.00 $233,065.00 $5.22
$318.00 $112,890.00 $314.33
$489.00 $75,795.00 $334.67
$73.00 $37,960.00 $66.00
$205.00 $27,675.00 $141.67
$35.00 $23,275.00 $44.33
$28.00 $18,340.00 $31.00
$2,000.00 $10,000.00 $1,916.67
$2,000.00 $10,000.00 $1,916.67
$10.90 $24,143.50 $9.43
$1.80 $31,053.60 $1.57
$16.65 $118,215.00 $14.88
$35.75 $178,750.00 $32.92
$16.50 $5,032.50 $12.83
$2.40 $69,120.00 $2.15
$7.60 $6,194.00 $4.97
$12.40 $12,933.20 $11.13
$1,100.00 $13,200.00 $783.33
$250.00 $3,750.00 $178.33
$735.00 $205,800.00 $355.00
$203,000.00 $203,000.00 $256,000.00
$7,000.00 $84,000.00 $8,166.67
$1,500.00 $15,000.00 $1,266.67
$2,000.00 $6,000.00 $1,833.33
$60.00 $136,920.00 $68.33
$85.00 $27,795.00 $95.00
$6.30 $16,443.00 $5.10
$1,928,484.80 $1,804,531.62
SnL Group Inc.

Page 2 of 2 ends

APPROVED
Packet Pg. 674 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway APPROVED Packet Pg. 675
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid

EUREKA WAY

PINE ST

BUTTE ST

SEQUOIA ST

CENTER ST PRINCE ST

SHASTA ST

GILBERT ST

MARKET ST

CONTINENTAL ST

CALIFORNIA ST

EAST ST

LIBERTY ST

CONTINENTAL ST
HWY 44

SUNDIAL BRIDGE DR
TRINITY ST CITY OF REDDING PROJECT PLANS FOR THE CONSTRUCTION OF JOB NO 8687 PROJECT LOCATION VICINITY MAP A-32883 TRINITY STREET BIKEWAY PROJECT REDUCED PLANS

CITY OF REDDING
TITLE

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY
PROJECT LOCATION PROJECT SHEET INDEX SHEET NO. SHEET TITLE DRAWING NO. 1 TITLE A-32883 2 DATA A-32884 3 NOTES AND QUANTITIES A-32885 4 CONTROL A-32886
5 KEY MAP A-32887
6 TYPICAL SECTIONS A-32888 7 THRU 12 PAVEMENT DELINEATION AND SIGNS A-32889 THRU A-32894 13 PAVEMENT DELINEATION QUANTITIES A-32895 14 PAVEMENT DELINEATION DETAILS A-32896 15 THRU 16 CONSTRUCTION DETAILS A-32897 THRU A-32898 17 TRAFFIC SIGNAL NOTES A-32899 18 THRU 19 TRAFFIC SIGNAL PLAN A-32900 THRU A-32901 20 TRAFFIC SIGNAL SCHEDULES AND DETAILS A-32902 21 CONSTRUCTION SIGNS A-32903 22 THRU 26 REU PLANS A-32904 THRU A-32908 BID NEGOTIATION NO 5400 APPROVED Packet Pg. 676
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid A-32884 ABBREVIATIONS

CITY OF REDDING
DATA

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY

PROJECT LEGEND (DO NOT DISTURB) REDUCED PLANS
APPROVED Packet Pg. 677
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid A-32885 GENERAL NOTES SUMMARY OF QUANTITIES ITEM QUANTITY UNIT

CITY OF REDDING

NOTES AND QUANTITIES

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY
PROJECT CITY OF REDDING CONSTRUCTION STANDARDS CALTRANS STANDARD PLANS 2022 ITEM PAGE DETAIL REDUCED PLANS APPROVED Packet Pg. 678
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid

EUREKA WAY

PINE ST

BUTTE ST

SEQUOIA ST

CENTER ST PRINCE ST

SHASTA ST

GILBERT ST

MARKET ST

CONTINENTAL ST

CALIFORNIA ST

EAST ST

LIBERTY ST

CONTINENTAL ST
HWY 44

SUNDIAL BRIDGE DR
TRINITY ST A-32886 CITY OF REDDING

CONTROL

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY
PROJECT REDUCED PLANS CONTROL POINT TABLE CP No. Northing Easting Point Elevation Description 601 2097108.10 6456523.92 506.18 COR WASHER 609 2097148.82 6456097.53 491.33 COR WASHER 610 2097208.42 6455518.05 500.26 COR WASHER 611 2096960.03 6454943.39 509.37 COR WASHER 612 2096918.85 6454584.71 522.35 620 2097625.84 6454287.49 528.10 621 2098034.32 6454155.23 543.13 COR WASHER 622 2098459.23 6454046.30 545.23 COR WASHER 623 2098352.26 6453870.34 543.93 COR WASHER 624 2098244.32 6453527.30 542.95 COR WASHER 625 2098156.00 6453248.89 548.72 COR WASHER 626 2098134.10 6453006.34 558.22 COR WASHER 628 2097874.08 6452213.72 565.71 COR WASHER CP 628 CP 626 CP 625 CP 624 CP 623 CP 622 CP 621 CP 620 CP 612 CP 611 CP 610 CP 609 CP 601 COR CAP ON REBAR COR WASHER APPROVED Packet Pg. 679
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid

EUREKA WAY

PINE ST

BUTTE ST

SEQUOIA ST

CENTER ST PRINCE ST

SHASTA ST

GILBERT ST

MARKET ST

CONTINENTAL ST

CALIFORNIA ST

EAST ST

LIBERTY ST

CONTINENTAL ST
HWY 44

SUNDIAL BRIDGE DR
TRINITY ST A-32887 CITY OF REDDING

KEY MAP

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY

PROJECT REDUCED PLANS
SHEET 7
SHEET 8
SHEET 9
SHEET 10
SHEET 11
SHEET 12
APPROVED Packet Pg. 680
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid A-32888 CITY OF REDDING

TYPICAL SECTIONS

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY

PROJECT REDUCED PLANS CONTINENTAL STREET BUTTE STREET CONTINENTAL STREET BUTTE STREET TRINITY STREET TRINITY STREET TRINITY STREET APPROVED Packet Pg. 681
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid A-32889 CITY OF REDDING
PAVEMENT DELINEATION AND SIGNS 1

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY

PROJECT REDUCED PLANS

CENTER ST TRINITY ST
MATCHLINE 'T' 15+50

MARKET ST TRINITY ST
MATCHLINE 'T' 21+00
MATCHLINE 'T' 15+50
CALIFORNIA ST 'T' LINE 'T' LINE 'T' LINE 'T' LINE D215 D115 APPROVED Packet Pg. 682
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid A-32890 CITY OF REDDING
PAVEMENT DELINEATION AND SIGNS 2

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY

PROJECT REDUCED PLANS

EAST ST TRINITY ST
MATCHLINE 'T' 27+00

LIBERTY ST TRINITY ST
MATCHLINE 'T' 32+50
MATCHLINE 'T' 27+00

GILBERT ST

PINE ST

PINE ST
MATCHLINE 'T' 21+00

EAST ST
LIBERTY ST 'T' LINE 'T' LINE 'T' LINE 'T' LINE D315
APPROVED Packet Pg. 683
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid A-32891 CITY OF REDDING
PAVEMENT DELINEATION AND SIGNS 3

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY

PROJECT REDUCED PLANS CONTINENTAL ST
MATCHLINE 'T' 38+00
TRINITY ST MATCHLINE 'T' 32+50

EUREKA WAY CONTINENTAL ST
MATCHLINE 'T' 44+00
MATCHLINE 'T' 38+00

SHASTA ST 'T' LINE 'T' LINE 'T' LINE 'T' LINE
APPROVED Packet Pg. 684
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid ONLY BUS ONLY BUS A-32892 CITY OF REDDING
PAVEMENT DELINEATION AND SIGNS 4

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY
PROJECT REDUCED PLANS CONTINENTAL ST MATCHLINE 'T' 50+00 BUTTE ST MATCHLINE 'T' 50+00
MATCHLINE 'T' 56+00
MATCHLINE 'T' 44+00 BUTTE ST 'T' LINE 'T' LINE 'T' LINE 'T' LINE D516 APPROVED Packet Pg. 685
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid A-32893 CITY OF REDDING
PAVEMENT DELINEATION AND SIGNS 5

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY

PROJECT REDUCED PLANS
MATCHLINE 'T' 67+00
MATCHLINE 'T' 61+50 BUTTE ST
MATCHLINE 'T' 61+50
MATCHLINE 'T' 56+00 BUTTE ST

SEQUOIA ST 'T' LINE
'T' LINE 'T' LINE 'T' LINE
APPROVED Packet Pg. 686
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid A-32894 CITY OF REDDING
PAVEMENT DELINEATION AND SIGNS 6

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY

PROJECT REDUCED PLANS
MATCHLINE 'T' 67+00 BUTTE ST

SUNDIAL BRIDGE DR 'T' LINE 'T' LINE
APPROVED Packet Pg. 687
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid A-32895 CITY OF REDDING

PAVEMENT DELINEATION QUANTITIES

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY
PROJECT REDUCED PLANS THERMOPLASTIC TRAFFIC STRIPE THERMOPLASTIC PAVEMENT MARKING PAVEMENT MARKERS LEGEND FOR STRIPING STRIPING NOTES: SIGN PLACEMENT ABBREVIATIONS SIGN LABELING CALTRANS CODE D11-1 R81 (CA) R81A (CA) R81B (CA) R9-6 R24 R32C RABA W16-5P R61-7 R61-5 BIKE BUFFER FOR ON-STREET PARKING (TYP) R1-1 APPROVED Packet Pg. 688
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid A-32896 CITY OF REDDING

PAVEMENT DELINEATION DETAILS

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY

PROJECT REDUCED PLANS PARALLEL PARKING LINES BIKE LANE DETECTOR SYMBOL BIKE LANE ARROW LARGE BIKE LANE SYMBOL USE FOR BIKE LANES SIX OR MORE FEET WIDE BUFFERED CYCLE TRACK A

BDRIVEWAY CYCLE TRACK AREA CYCLE TRACK STRIPING YIELD TRIANGLES CYCLE TRACK GUIDE LINE CYCLE TRACK TREATMENT DETAILS HIGH VISIBILITY PEDESTRIAN CROSSING AT CYCLE TRACK MODIFIED BIKE LANE ARROW HIGH VISIBILITY CYCLE TRACK CROSSING (GREEN) FLEXBOLLARD WITH SIGN POST DETAIL STOP CYCLE TRACK END PEDS YIELD TO APPROVED Packet Pg. 689
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid A-32897 CITY OF REDDING
CONSTRUCTION DETAIL 1

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY
PROJECT REDUCED PLANS TRINITY ST PINE ST DETAIL 3 CONSTRUCTION NOTES LEGEND DETAIL 1 DETAIL 2

MARKET ST TRINITY ST TRINITY ST
APPROVED Packet Pg. 690
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid A-32898 CITY OF REDDING
CONSTRUCTION DETAIL 2

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY

PROJECT REDUCED PLANS CONTINENTAL ST

TRINITY ST
EUREKA WAY 'T' LINE DETAIL 4 LEGEND DETAIL 5 CONSTRUCTION NOTES CONTINENTAL ST APPROVED Packet Pg. 691
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid E-1CITY OF REDDING

TRAFFIC SIGNAL NOTES

PUBLIC WORKS DEPARTMENT ,
,
, ·· TRINITY STREET BIKEWAY

PROJECT

APPROVED
Packet Pg. 692 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid Negotiation No.5400, Trinity St. Bikeway Project) E-2CITY OF REDDING

TRAFFIC SIGNAL PLAN

PUBLIC WORKS DEPARTMENT

S MARKET STREET
SR 273/299

TRINITY STREET

TRINITY STREET

TRINITY STREET BIKEWAY

PROJECT

ALLEY ALLEY
ALLEY

REMOVING SIGNAL AND LIGHTING

MARKET ST AND TRINITY ST
(EXISTING)

APPROVED
Packet Pg. 693 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid Negotiation No.5400, Trinity St. Bikeway Project) E-3CITY OF REDDING

TRAFFIC SIGNAL PLAN

PUBLIC WORKS DEPARTMENT

S MARKET STREET
SR 273/299

TRINITY STREET

TRINITY STREET

TRINITY STREET BIKEWAY

PROJECT

ALLEY ALLEY
ALLEY

MODIFY SIGNAL AND LIGHTING

MARKET ST AND TRINITY ST
13'
8'
30"

APPROVED
Packet Pg. 694 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid Negotiation No.5400, Trinity St. Bikeway Project) E-4CITY OF REDDING TRAFFIC SIGNAL SCHEDULES AND DETAILS PUBLIC WORKS DEPARTMENT TRINITY STREET BIKEWAY PROJECT

MODIFY SIGNAL AND LIGHTING

MARKET ST AND TRINITY ST

APPROVED
Packet Pg. 695 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid Negotiation No.5400, Trinity St. Bikeway Project)

EUREKA WAY

PINE ST

BUTTE ST

SEQUOIA ST

CENTER ST PRINCE ST

SHASTA ST

GILBERT ST

MARKET ST

CONTINENTAL ST

CALIFORNIA ST

EAST ST

LIBERTY ST

CONTINENTAL ST
HWY 44

SUNDIAL BRIDGE DR

PARK MARINA DR
TRINITY ST A-32903 PROJECT FUNDING SIGN CONSTRUCTION AREA SIGNS (STATIONARY MOUNTED) TRINITY STREET BIKEWAY PROJECT THIS PROJECT HAS BEEN MADE POSSIBLE BY FINANCING FROM:

CITY OF REDDING

CONSTRUCTION SIGNS

PUBLIC WORKS DEPARTMENT

TRINITY STREET BIKEWAY

PROJECT REDUCED PLANS CALIFORNIA CLIMATE INVESTMENTS
APPROVED Packet Pg. 696
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid .---------------------------·--------------------------------------------------------------------------------------------------. ◄
H:\Servioo Plannlog\1. Planning Projects\3. In Design Const Projects Applications submitted\2023\23--062 Trinity St Bikeway lighting\23-062 Trinity St Bikeway Lighting.dwg

REVISIONS
MARK DATE DESCRIPTION VERIFY SCALE s, CK"O APPR

BAR IS ONE INCH ON
ORIGINAL DRAWING.
0 1 "

IF NOT ONE INCH ON
THIS SHEET. ADJUST

SCALES ACCORDINGLY
SYMBOL
350
/16
+G
■ SIZE INDICATED
■
---
(j.
~
fil
~
[0J

SYMBOL LEGEND

DESCRIPTION
4" CONDUff (SECONDARY)
2" CONDUff (SECONDARY)
2-/1350 + 1-#4/0
USE-2/RHW-2 AL
2-/16 + 1-/16 GN GROUND
USE-2/RHW-2 AL
1- #6 GN GROUNDING CONDUCTOR
USE-2/RHW-2 AL
SPLICE BOX (3E/ 4E/5E}
SPLICE BOX {2E}
LED COBRA-HEAD STREET LIGHT, 25'
STANDARD, W/LUMEN PACKAGE S10

EXISTING POLE, W/ RISER

REPLACEMENT POLE, W/ RISER

WORK LOCATION IDENTIFIER
EXISTING 3- PADMOUNT TRANSFORMER
EXISTING 1 - PADMOUNT TRANSFORMER
0/~ / ' / ' EXISTING STANDARD STREET LIGHT OR

POLE MOUNTED STREET LIGHT
DESIGN BY R. SHAEFFER
DRAWN BY R. SHAEFFER C
CHECKED BY C,. {!')_.,....,...,
CI RCUI T MAP C-1 4
ATLAS NO H- 28, J-29

SCALE DATE
AS NOTED 05/11/23
o-{)TL / '
Ll]
[l]
l3X5 1
6 --------=---
~

EXISTING STREET LIGHT ON

TRAFFIC SIGNAL
EXISTING 3E BOX
EXISTING 2E BOX
EXISTING 3X5 BOX
EXISTING 1- POLE-MOUNT

TRANSFORMER

EXISTING SERVICE LATERAL

EXISTING POLE
APPRVEDBY: ~u

ELECTRIC MANAGER -

ENGINEERING

PUBLIC WORKS

CONSTRUCTION

STANDARDS
520.80, 521, 522, 526,
620, 622
520.80, 521, 522, 526,
620, 622
510
510
510
512, 524, 525
512, 524, 525
512, 554, 555, 556, 560,
580
547
547
GENERAL NOTES:

1. DETAILED CONSTRUCTION REQUIREMENTS FOR WORK SHOWN ON

THESE DRAWINGS ARE DESCRIBED IN THE CITY OF REDDING PUBLIC WORKS CONSTRUCTION STANDARDS BOOK. STANDARDS REFERENCED

IN THE LEGEND OR LISTED ELSEWHERE ON THESE DRAWINGS SHALL

BE FOLLOWED WHEN PERFORMING WORK SHOWN ON THESE
DRAWINGS. STANDARDS ARE AVAILABLE ON-LINE OR AT THE PUBLIC WORKS DEPARTMENT, CrrY OF REDDING, 777 CYPRESS AVE.,
REDDING, CA.

2. ALL SUB-GRADE WORK SHALL BE INSPECTED BY REU PRIOR TO COVER/BACKFILL. CALL THE REU INSPECTOR, CELL: 530- 510-6746 TO SCHEDULE AN INSPECTION. SCHEDULE INSPECTIONS AT LEAST 48 HOURS PRIOR TO DESIRED BACKFIWNG.

3. ffEMS AND TEXT SHOWN BOLD ON THESE DRAWINGS REPRESENT

WORK GOVERNED BY THE ELECTRIC UTILITY THAT IS PART OF THIS PROJECT. rrEMS AND TEXT SHOWN THIN OR SCREENED REPRESENT EXISTING rrEMS OR PROJECT WORK THAT IS NOT COVERED BY THE ELECTRIC UTILITY DESIGN. BOLD TEXT ASSOCIATED WITH ITEMS

SHOWN THIN OR SCREENED REPRESENT WORK TO BE PERFORMED
ON THOSE ITEMS AS PART OF THIS PROJECT. REFER TO THE
"DIVISION OF WORK RESPONSIBILITIES" SECTION ON THIS SHEET AND WORK LOCATION DESCRIPTIONS FOR ADDITIONAL INFORMATION.

4. THIS DRAWING IS SCHEMATIC IN NATURE. EXACT DIMENSIONS OR

LOCATIONS OF ITEMS OR EQUIPMENT ARE NOT SHOWN UNLESS
SPECIFICALLY DIMENSIONED OR NOTED. TRrnCH REQUIREMENTS, CONDUIT SPACING, CLEARANCES, ETC. SHALL BE AS DESCRIBED IN

THE PUBLIC WORKS CONSTRUCTION STANDARDS REFERENCED IN THE SYMBOL LEGEND ON THIS SHEET.

DIVISION OF WORK RESPONSIBILITIES:

CUSTOMER TO FURNISH AND INSTALL:
• ALL 4" CONDUff
• ALL SECONDARY CONDUCTORS (POLE MOUNTED EXCLUDED)
• ALL SECONDARY BOXES; 2E,3E,4E etc.
• ALL 2• CONDUff
• ALL STREET LIGHTS (POLE MOUNTED EXCLUDED)
• ALL STREET LIGHT CONDUCTORS {POLE MOUNTED EXCLUDED)
REU TO FURNISH AND INSTALL:
• ALL SECONDARY CONDUCTOR SPLICES
• ALL POLE MOUNTED STREET LIGHTS
-

1. 2.

3. 4,

5. 6.

7. 8.

9. 10.
i 1.

12. 13.

14. 15.

16. 17.

18. 19.

20. 21.

22. 23.

24. 25.

26. 27.

PAGE
REDDING ELECTRIC UTILITY 501 00
CONSTRUCTION REQUIREMENTS APPLICABLE FOR ALL TYPES OF SERVICE '---'-·-'--'-· -•-'-·-· ---1 {i.e., Residential, Commercial, and Industrial)
The Developer/Customer shall perlorm all trenching and backfill per City of Redding Public Works Ccnstruction Standards pages 507,521, and 620 through 624.20.

The Developer/Customer shall furnish and install (unless otherwise shown) all conduits for services, secondary and 4" primary conduits. Below grade conduits shall meet the requirements of Standard 521. For new primary express feeders, REU will normally furnish any required 6" conduit~ {excluding secondary or service) for the Developer's/Customer's installation. The Developer/Customer shall be required to transport the 6" conduit to the job site from the REU storage location, The customer/developer shall be responsible for 6" conduit required for relocat(ons and undergrounding of existing REU facilities.

Bell ends shall be placed on all conduit terminations. Bell ends shall be of the same type material as conduit to which they are attached (i.e., D.B., Sch. 40, Sch. 80).

All conduits installed by the Developer/Customer shall be cleaned by using brushes and/or swabs.

All 4" conduit runs. less than 600' long without conductors shall have a minimum 1250Ib poJyester MULETAPE®, or equal (especially designed for that purpose) pull line provided and Installed by the customer/developer. All 6" conduit and 4" conduit runs greater than 600' without conductors shall have a minimum 2500Ib polyester MU LET APE® or equal pull line provided and installed by customer/developer.

Conduit system is for future use as well as initial cable installation; therefore, Developer/Customer shall use all care required during pulling cable to insure that conduit is not damaged.

All conduit sweeps shall be PVC Schedule 40. All conduit riser bends shall be PVC Schedule 80, or equal, per Standard. 547.

Conduit sweeps or bends sh.all not be cut or otherwise modified. All joints shall be glued per manufacturer1s specification and provide a water tight ftt.

Developer/Customer shall furnish and install all low voltage (0-600V) cable. Cable shall be XLPE insulated, NEC type "U.S.E.-2" Aluminum per Standard 510, unless otherwise specified.

Developer/Customer shall coil 3' of cable in each splice enclosure with ends protected by plastic caps taped secure to the cable.

All cable will be spliced by REU except at the service entrance (note Item 16 beiow).

The Developer/Customer shall furnish and install all substructures, 3' x 5' boxes and smaller. REU will normally-furnish for the Developer/Customers installation any required boxes larger than 3' x 5'.

Conduit runs shaU be limited to not more than 3-90° bends, or a combination of anglos with not more than 270" (leflection throughout the conduit run unless shown otherwise on REU approved plans.

All conduit and wire sizing will be by the Electric Utility Engineering staff.

There shall be no splices in low voltage (600V) wire except in REU approved splice enclosuros.

All new panels over 200 amp rating shall be served by an underground service (City ordinance).

Developer/Customer shall furnish, insl;!II, own and maintain conduit 2 feet from his outer builcling line to his terminating facility.

All service conductors shall be terminated by the Developer/Customer at his service entrance panel. All terminations will be by 2-hole NEMA pad compression lugs except ior 200 amp and smaller residential panels. Service conductors larger than 4/0 must use .2~ hole NEMA pad compression lugs. All connections will be properly torqued and installed to manufacturer's specifications. Approved corrosion inhibitor will be applied on wire ends at all connections.

Replacement or enlargement of low voltage wire and condutt due to relocation or increased load shall be the responsibility of the Developer/Customer.

REU will determine all points of service. Service points normally shall provide minimum cable lengths and provide accessibility for operations and maintenance.

The neutral conductor of low voltage (600V) tri-plex cable shall be insulated with a yellow pigmented XLP compound for easy .identification. Single conductor cable used as neutral without yellow marking (pigmented) shall be identified at each splicing point by approved white electrical tape.

The Developer/Customer shall provide all necessary easements for electric supply facil"ies as required by REU.

Developer/Customer shall be responsible to locate and properly place electric utility facilities within utUity easements and public right of way.

Developer/Customer shall furnish and install street light base, conduit, standard, arm, luminaire, and conductor per Standards 554, 555, and 556.
lt is the responsibility of the Developer/Customer to set all primary boxes- so "that the box lid is at the same elevation as the lowest final elevation of the adjacent sidewalk, top of curb or pavement edge (existing, proposed, or future). All secondary boxes will be set at the same elevation and slope of the adjacent sidewalk, curb or pavement.

All conduit and substructures to be used by REU must be inspected prior to backfilling. Failure to obtain an inspection will require the installer to expose any or all of the buried facilities for an lnspecilon. Call 224-4390, 48 hrs prior to backfilling, to schedule an inspection by the Electric Utility lnsp!l\>tor.

All utility padmount transformers and switchgear equipment shall be located within 8' of a paved driveable access.

Groundwater/stormwater intrusion and migration in any trench is the responsibility of the customer and/or his trenching agent for the life of facilities placed in the trench.

Electric meter service panels must meet Electric Utility Service Equipment Requirements Committee (EUSERC) standards accepted by REU.

CHANGED CONSTRUCTION STANDARD REFERENCES TO PUBLIC WORKS STANDARDS SHEET 1 OF 1

ELECTRIC CONSTRUCTION STANDARD

ELECTRIC SERVICE CONSTRUCTION REQUIREMENTS
Redding Electric Utility DES/REV
RO/JCR
I DATE AS~•NTDIRECTOR, DISTRIBUTION I REVISED rt DWG. NO.

I 02/01/87 - 7, I// /?A.' II, I 03/27/18 /lll\. CS0102
(REU USE ONL YI

REU POLE DATA
Remaing Reason
Pole No. Location Ht. Class Strength (Comp, Const.
(%) Non-Comp, Deadline
New)
Comments
H28165 1025 CONTINENTAL ST. 45 2 65 COMP 07/13/23
H28181 1055 CONTINENTAL ST. 50 2 56 COMP 06/29/23 BUTT/ SHELL ROT H28179 1201 CONTINENTAL ST 50 2 65 COMP 04/28/23 POLE TOP IS HOLLOW RIIJ TRINITY ST./CONTINENT AL ST,/BUTTE ST. WORK-ORDER NO.

City of Redding
Electric Utility Know what's below.

Call before you dig.

TRINITY ST. BIKEWAY LIGHTING
23-062
REVISION:

SHEET 1 OF 5

APPROVED
Packet Pg. 697 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid Negotiation No.5400, Trinity St. Bikeway Project) ◄
-.J
::t
0 le(
2 I @
I :
•
•
m
•
%
I . •
w
•
X
.. , .

J . " 1
I
# , •.
l' -
1 I
I
I
t
I 1 I
--------,--!.

I
'° I °"'I
I
I
I
'I
I
H28263
11 50'
I
=---'•'\"
556AAC
'-'~

I I I I I I I I I I I I I
15 H28240 ii ' / : p
H:\Service Planning\1. Planning Projects 13. In 0<:1sign_Const Pmjects_Applicstions submilted\2023\23-062 Trinity St Bikeway Lighling\23-062 Trinity St Bikeway Lighting dwg

REVISIONS

MARK DA TE DESCRIPTION
1 iDG
H28136
NL' / 45'
SM/ ,
C306 1
E1200RI
C.,_ I I
·--U) · H28137 :-,,-,
45' .. _ -- ·---,--- -··· .... ······-- _"'-: " .. . " . . ··"· ___ -·::.:c'··_." .. -· .... ...... , ......... ····-· I
~ (1)=.---
--- ----
I I
,I!
''11 1 ~;/.---=
- - - ----- ' - -- --~---- ~~ '
1 1·-.-~z:- • :J ~ , ~ .... i .. r==::i"+c=z=:=.:•=z:2 = ::i•c====:=1:= - -qy; ---·- ~ -···-····~ -.--- --- --- - - 2 -------- -------·----
1 ' /
i
~I
I' ·
'

ELECTRIC UTILITY PLAN
SCALE: 1"=30'
Ii
I II
I 'I
I 'i
I !I
I
II
I ii
I ii
s
MD
'
I
\
I
I \
I" \
II I I ~
I ! ~ .er jj j I .
---~· r: .. :cc. _.:, ____ ,_, ______ -+ \ .....

BY
'-- TRINITY ®
"e "C.::.= .. 3:•=z= .. =· II ::;z_:=i=·=-==i;;;;;;==~ ==;;;.:::::; "'---- CK'D APPR.

N
)>
n
V,
;u
VERIFY
+
- kJ/_;;= •="
SCALE

BAR IS ONE INCH ON
ORIGIN AL DRAWING.
0 1 '

IF NOT ONE INCH ON

THIS SHEET, AD JUST

SCALES ACCORDINGLY
C328::;J
,t
JV

ELECTRIC UTILITY PLAN
SCALE: 1"=30' • s
DESIGN BY R. SHAEFFER
DRA WN BY R. SH AEFFER
CHECKED BY v .M;-e
CIRCUIT ,1AP C-1 4 r
ATLAS NO lAA H-28. J- 2 9
SCALE DATE APPROg DBY:

ELECTRIC MANAGER AS NOTED 05/11/23 ENGINEERING
I
t-J \~
556AAC

37.5/37.5/37.5
I I
I
TRINJ T'.
23+00
556AAC
1;
II !
1· I ,I I
,, I
" '·-
R
City of Redding Know what's below. Electric Utility Coll before you dig.

I
1135
I
SHEET NOTES:
0 WORK LOCATION TAGS ADJACENT TO STREET LIGHTS ALSO INCLUDE CONDUIT, CONDUCTORS, AND BOXES ASSOCIATED WITH EACH STREET LIGHT.
0 CUSTOMER IS RESPONSIBLE FOR UNDERGROUND CONDUIT STUB UP AT NEW RISER LOCATION.

CUSTOMER SHALL COORDINATE WITH REU INSPECTOR AT (530) 510-6746 TO DETERMINE ACCEPTABLE POLE QUADRANT PRIOR TO INSTALLING NEW RISER. CUSTOMER SHALL COIL SUFFICIENT CONDUCTOR AT BASE OF POLE FOR REU INSTALLED RISER.

WORK BY REU
@\ll~----
(1)-USR-21-SINGI.E PHASE RISER, SECONDARY 2"
(3)-E76230--CONN,SEC,3-TERM,f6-35DKCML
@\ll-------
(1)-NLBW-M-SL/NL MEDIUM LED W/6'ARM
(113)-E645.92-CABLE, SERV OH 6 ACSR TRI 600V V(
@\ll~----
(1)-USR-21-SINGLE PHASE RISER, SECONDARY 2"
(3)-E76230--CONN,SEC,3-TERM,,S-350KCML
@\ll~------
(1)-NLBW-M-SL/NL MEDIUM LED W/6'ARM
&Ill _____ _
(1)-NLBW-M-SL/NL MEDIUM LED W/6'ARM
Bl!
(1)-NL6W-M-SL/NL MEDIUM LED W/6'ARM
@\ll~------
(1)-NL6W-M-SL/NL MEDIUM LED W/6'ARM
@\ll~----
(1)-NLBW-M-SL/NL MEDIUM LED W/6'ARM
(125)-E645.92-CABlf, SERV OH 6 ACSR TRI 600V VOLUTE
TRINITY ST./CONTINENTAL ST,/BUTTE ST. WORK-ORDER NO.
23-062
TRINITY ST. BIKEWA Y LIGHTING REVISION:

SHEET 2 OF 5

APPROVED
Packet Pg. 698 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid Negotiation No.5400, Trinity St. Bikeway Project) ◄
VJ
®
m
w •
z
-.J
::c:
0 1,59 I-
<
:E
I
.

H28189 .
50'
0 ~
"
®
,EJI
'HJ95
~'.5-Y(/)
,,-+-············"··-·· -
556AAC
- 1/0
il
II " <
<_;
~
n
I <
3 0 a & ~ ■ ■ ■ ru M a ■ a ■ a w ■ ■ _ -,'--,,-----:,. ----r- -.-. --r--c.,-,---,--;.,---:,-•• ,----------,~.- •
•
'
1·
" I
F
j:
]: j I
;i . I
u '
i ;:: I
~ I
I :" I
I I I
...___c___. ______ ~ .~L==-~~
9 iC239
X i r: .. \·-· ···-··-··-·
' h,J;t
) ~'
I l'
I
'
j i
I Ii
11 I ;;
•
-~ Ll #6 - ;1
t: ♦ Z f / =·1 7 i t ~-
_ _,_- -·--~- ._ ...... ,~,---,. l.,.: .......... J
OO·'VC S10
--··- 10
C
E
I
7 I .. • •
86 - - - - "-'I' 11 ----
'/( - - - /16 -. - ----·-· ··-.. " - -=,!!""'~~-'!"""f- ""' •~• - ----- --~"-'' '"CC-0." 556AAC 2 8162
2/0 EPR . ...... _ 5'
15K

ELECTRIC UTILITY PLAN
SCALE: 1~.30•
g'
0 '-.
"'
(J)
H28168
45· t "- /0
29+GU
s
----------------·--
.~Le• -- .. ·• -- ····· "-~--"~------~ ------.
' " \ '0
"8-\ '; TR1NJ1'}~S-,-T-. -----
'; ___ ====J;"?;,""0•::: G ================"""=' •i=O=O==o@·~; =-=·=.-"'-1" -,,, = - -=""ll () r "I" T -r T' "al i" "> w
rummrnwmmwwrn ■ /--,,-=•_,;:==-,.:__,; ·-.-~-.--•--
_ .-~-~.---7-~.--7~~., Z _;;,._,,;;__;;;_,7""&-_._fu""---'~W'~'~'·" fk»,="'=='=WW~ :::i Ii
" I
II ;
'Ii
Ii i
ti j
i,
'I'
I '
j !!
I
I ii Ill
556AAC
• •
556AAC
f'
_.::.L2i -----
et:

V)
u
<(
.,,.
• •
T10475L
300
I
I
Q
w
z
:::i
::c:
0 I-
<
:E
SHEET NOTES:
0 WORK LOCATION TAGS ADJACENT TO STREET LIGHTS ALSO INCLUDE CONDUIT, CONDUCTORS, AND BOXES ASSOCIATED WITH EACH STREET LIGHT.
0 CUSTOMER IS RESPONSIBLE FOR UNDERGROUND CONDUIT STUB UP AT NEW RISER LOCATION.

CUSTOMER SHALL COORDINATE WITH REU INSPECTOR AT (530) 510-3421 TO DETERMINE ACCEPTABLE POLE QUADRANT PRIOR TO INSTALLING NEW RISER. CUSTOMER SHALL COIL SUFFICIENT CONDUCTOR AT BASE OF POLE FOR REU INSTALLED RISER.
0 REU SHALL RE-ORIENTATE EXISTING STREET LIGHT ON POLE Afj SHOWN ON DRAWING

INTENTION TO CONSTRUCT AND AUTHORIZATION
DA TE, 05 /11 /23 REU WORK ORDER NO. 23-062
,aoM, Redding Electric Utlllty av, R. SHAEFFER Redding, CA

UTILITY REPRESENTATIVE AUTHORIZATION REASON FOR VOLTAGE !EMAIL! No. INSTALLATION/REPLACEMENT LIMITATION
~ REU Ryon Shaeffer ~ OETERIORA TED ~'2<V rshoe ff er@r eupower.com □ NEW BU~NESS □ 115KV
Join t Pole Cle rk (Owne r t o Owne r) □ RELOCATION □ OTHER □ PG&E pge join tpoleogenc [email protected]
APPROVED, □ ABAN DONMENT
□ CAR VS POLE
Joint Pole Clerk □ OTHER
~ AT&T [email protected]
APPROVEO:

LOADING CALCULATIONS PER O'-CALC, ATTACHED

JOINT POLE DAT A
POLE OR POLE OR POLE SP ACING YEAR PLACE TOP REM ANC. NO. ANG.SIZE CLASS AT&T NEUT. REU NEUT. P G&E SET NEW JP-1 45' 2 REU 24' 6' 8.5' 2023
EXISTING H28165 45' 2 24' 6' 8.5' 1981 REU ATT
NEW JP-2 50' 1 REU 24' 6' 13' 2023
EXISTING H28181 50' 2 24' 6' 13' REU ATT
NEW JP-3 50' 2 REU 24' 6' 13' 2023
EXIS TIN G H28179 50' 2 24' 6' 13' REU ATT

WORK BY REU
@llL~---- (1}-NL6W-M-SL/NL MEDIUM LED W/6'MM
@llL~----
(1)-NL6W-M-SL/NL MEDIUM LED W/6' MM
Bll
(1)-NL6W-M-SL/NL MEDIUt.4 LED W/6'MM
@!!!;,--------
(1}-NL6W-M-Sl./NL MEDIUM LED W/6'MM
.l3/llla--------
(1}-NL6W-M-SL/NL MEDIUM LED W/6'MM
(100}-E645.92-CABLE, SERV OH 6 ACSR lRI 600V VOWTE
(1)-E415.08-INSULATOR, SECONDARY SPOOL J101
@l!J.------- (1}-NL6W-M-SL/NL MEDIUM LED W/6'MM
@llla--------
(1)-NL6W-M-SL/NL MEDIUM LED W/6' MM
(162)-E645.92-CABLE, SERV OH 6 ACSR TRI 600V VOLUTE
@l!J.;;--------
(1)-12SST3-12KV UNDERMM SJDEBREAK SW TANGENT
(1)-PLCL2-45-POLE 45' CLASS 2
Bll
(1)- PLCL2-45-POLE 45' CLASS 2
(1)-12SB3H2H-SV,HCH KPF 12KV TANG.BELOW POLE TOP
ll!.
(1)-0HG-3/8-0VERHEAD (SPAN} GUY 3/8"
@llla--------
(1}-E415.08-INSULATOR, SECONDMY SPOOL J101
(1}-NL6W-M-SL/NL MED!Ut.4 LED W/6'MM
(163)-E645.92-CABLE, SERV OH 6 ACSR lRI 600V VOLUTE
@llla-------- (1)-12BB3H3H-12KV HEAVY 3 ~RE DBL MM TANGENT (1)-12T3H-1HREE PH.TXF.PRIMARY BUS W/CO-ARM
(2}-INS-SEC-INSULATOR, SECONDARY SPOOL W/r:xT BRKT
(1 )-TGN-TXF-GROUND OVERHEAD lRANSFORMER
(1)-TB1P-1B-BUS 1PH #2/0VIPC 37.':K-VA & 50KVA
(1)-TGN-TXF-GROUND OVERHEAD lRANSFORMER
(1)-TB1P-1A-BUS 1PH #2'1/PC <= 25KVA
(1)-PLCL1-50-POLE, 50', Cl.ASS 1
ll!.
(2)-0HG-3/8-0VERHEAD (SPAN) GUY 3/8"
(1}-DG-3/8-DOWN GUY 3/8"
(1}-0T50-1-1RANSFORMER 50KVA SPO 120/240
(1)-0T25-1-1RANSFORMER 2':K-VA SPO 120/240
(1)-0HG-3/8-0VERHEAD (SPAN) GUY 3/8"
Bll
(1)-12BB3H3H-12KV HEAVY 3 ~RE DBL MM TANGENT
(1)-12T3H-1HREE PH.TXF.PRlt.lARY BUS W/CO-Mt.4
(1)-PLCL2-45-POLE 45' CLASS 2
(1)-E415.08-INSULATOR, SECONDARY SPOOL J101
@llL~------
(1)-PCAP-120-CAPACITOR PM 1200 KVAR TIME CONlROL
(1)-PLCL2-50-POI.E 50' Cl.ASS 2
(1}-USR-21-SJNGLE PHASE RISER, SECONDMY 2•
(3}-E762.30-CONN,SEC,3-TERM,#6-350KCML
(1)-12BB3H3H-12KV HEAVY 3 ~RE DBL MM TANGENT
(1}-INSDE-SC-INSULATOR, SEC. DE SUSP. TYPE
(1}-INS-SEC-INSULATOR, SECONDARY SPOOL W/EXT BRKT
ll!.
(1)-0HG-3/8-0VERHEAD (SPAN) GUY 3/8"
Bll
(1)-12BB3H3H-12KV HEAVY 3 ~RE DBL MM TANGENT
(1)-INSDE-SC-INSULATOR, SEC. DE SUSP. TYPE
(1}-PLCL2-50-POLE 50' CLASS 2
(1)-E415.08-INSULATOR, SECONDARY SPOOL J101
________ ..,_,_,,__,,-_,,_,,i...i... ........... .;.....i..,_,__,__ _________ _. __________ -1..1__ _______ L_ _______ __LwW ____ .,.--___________ _j__ _ .Y-Y/ __j-'.___j ,°" ______ __jL_ _ _L_ ___________________________________ __u _ __ -li

MATCH LINE C
H:\Servica Planning\1. Planning Projects 13. !n Design_Const Projscts_Applic;ations subrnitted\2023\23--062 Trin;ty St Bikev;ay Ughting\2:}-062 Trinity St Bikeway Lighting.dwg

REVISIONS
MARK DAT£ DESCRIPTION BY CK'D APPR VERIFY SCALE

BAR IS ON E INCH ON
ORIGINAL DRAWING.
0 1 ,.

IF NOT ONE INCH ON

TH IS SHEET, ADJU ST

SCALES ACCORDI NGLY

ELECTRIC UTILITY PLAN
SCALE: 1"=30'
DESIGN BY R. SH AEFFER
DRAWN BY R. C AEFFP
CHECKED BY ,J'Y,-.,---. I
CIRCUIT MAP C- 14
ATLAS NO H- 2 8, J-29
i.;,;,;.:;.;.:;;..;;.SC~A-L~E=;;;;;;:~==~D~A~TE==~APPRO~Y~ ELECTRIC MANAGER - AS NOTED 05/11/23 ENGINEERING
R
City of Redding
Electric Utility
•
Know what's below.

Call before you dig.

I
TRINITY ST./CONTINENTAL ST,/BUTTE ST .

TRINITY ST. BIKEWA Y LIGHTING
WORK-ORDER NO.
23-062
REVISION:

SHEET 3 OF 5

APPROVED
Packet Pg. 699 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid Negotiation No.5400, Trinity St. Bikeway Project) ◄
I
I

ELECTRIC UTILITY PLAN
SCALE: 1":30'

I MATCH LINE F I
t---------,,------,-.--------------------------------------,.---------~-H!"'-----~-------·- 556AAC ,
I

ELECTRIC UTILITY PLAN
H:\Service Planning\1. Planning Projects\3 In Oesign_Const Projects_Applications submittsd\2023123-062 Trinity St Bikeway Lighting\23-062 Trinity Sl Bikeway Lighting.dWg

REVISIONS

MARK DATE DESCRIPTION BY CK'D APPR VERIFY SCALE

BAR IS ONE INCH ON
ORIGINAL DRAWING.
a 1 "

IF NOT ONE INCH ON

THIS SHEET, ADJUST

SCALES ACCORD IN GLY
u
<(
<(
<D
"' "'

DESIGN BY

DRAWN BY

CHECKED BY
R. SHAEFFER
R.

C H,: ,0:.~ /
•
IL -
w
z
I
556AAC ' : ·-·''"···~--- -_J-__ ___ ,_
CIRCUIT MAP C-1 4
ATLAS NO H-28, J-29
i.:,;~;:_;;,S;;;_CA_L.;;E;;;;;;~~~=;;D;;A;;T;; E ==;.! APPRO~Y~ AS NOTED 05111123 ELECTRIC MANAGER -

ENGINEERING
C
til
8 JL

ELECTRIC UTILITY PLAN
SCALE: 1°•30'
City of Redding
Electric Utility
s
Know what's below.

Call before you dig.

I
I
SHEET NOTES:
0 WORK LOCATION TAGS ADJACENT TO STREET LIGHTS ALSO INCLUDE CONDUIT, CONDUCTORS, AND BOXES ASSOCIATED WITH EACH STREET LIGHT.
0 CUSTOMER IS RESPONSIBLE FOR UNDERGROUND CONDUIT STUB UP AT NEW RISER LOCATION.

CUSTOMER SHALL COORDINATE WITH REU INSPECTOR AT (530) 510-3421 TO DETERMINE ACCEPTABLE POLE QUADRANT PRIOR TO INSTALLING NEW RISER. CUSTOMER SHALL COIL SUFFICIENT CONDUCTOR AT BASE OF POLE FOR REU INSTALLED RISER.
@ CUSTOMER SHALL REMOVE (E) 2E SPLICE BOX & REPLACE W/ NEW 3E SPLICE BOX 0 CUSTOMER SHALL RUN NEW GROUND WIRE THROUGH EXISTING CONDUIT RUN, IF UNABLE TO PULL CONDUCTOR, EXISTING CONDUCTOR SHALL BE REPLACED W/ NEW CONDUCTOR + GROUND. CUSTOMER

SHALL COORDINATE W/ REU FOR DISCONNECT & CONNECTION OF NEW GROUND WIRE OR REPLACEMENT

CONDUCTOR RUN
I
·r·~· .. -·-·- ··••-·
_1\ ~--"~'"-·-=-----•-•---'--"""-lL ___ ,_,,,,_ .. -=c___ ~----·~· .. ·-:i:::.····,:,,,-;;···------------,-IJ6+G·----------------------- ~ ·~ E
I

WORK BY REU
@IU.~------
(3)-E762.30-CONN,SEC,3-TERM,,S-350KCML
(1)-USR-21-SINGLE PHASE RISER, SECONDARY 2'
@IU.-------
(1)-USR-21-SINGLE PHASE RISER, SECONDARY 2'
(3)-E762.30-CONN,SEC,3-TERM,,S-350KCML
@IU.-------
(1)-NL6W-M-SL/NL MEDIUM LED W/6'ARM
Ill!
(1)-NL6W-S-SL/NL SMALL LED W/6'ARM
TRINITY ST./CONTINENT AL ST,/BUTTE ST. WORK-ORDER NO.
23-062
TRINITY ST. BIKEWA Y LIGHTING REVISION:

SHEET 4 OF 5

APPROVED
Packet Pg. 700 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid Negotiation No.5400, Trinity St. Bikeway Project) ◄
-..I
:c
(.)
le(
:E
I
I
J29095 / ' , 45' - 7 1-2" 556AAC ..... /"- - --...,._ • .,:.,.. ·!cc·· ••. , ;" ,. •. ,_ : ·--- - - - - -- '2
-------------- ····· , •. ,.- ····"'1-4"--~-·-·············· •-- _, ... _,,,_ 556AAC
H:\Servk:e Planning\1. Plannirig Projeds\3. In Design_Const Projects_Applications submitled\2023\23-062 Trinity St Bikeway Ughling\23-062 Trinity St Bikeway Lighting.dwg

REVISIONS
<(
..,
X
-·, :. ' ... 556AAC I ' 1
··2290 -=-·•=l11F',,, .. ' 1-4", ,,, .•...... ./ -~=7 • . .••.. ,='L~--·=· =~ 15K
t~ T2869L
225

ELECTRIC UTILITY PLAN
BUTTE ST. @ SEQUOIA ST.
---
SCALE: 1"=30'
------
J29104
45'
---------
556AAC

ELECTRIC UTILITY PLAN
BUTTE ST. ® SUNDIAL BRIDGE DR.

SCALE: 1"=30'
15/50
s
VERIFY SCALE DESIGN BY R. SHAEFFER
1-.::M::::AR:::_K-+_::.,DA::;"''--+Dc:cE;::;SC:;: RIPc:,' :::; 'O':..._ ______________________ -+_;;Bc., < +C"'K'.:.. D+A.c.Pc:.PR;;_. +--- ---------;DRAWN BY R. SHAEF9ER BAR IS ONE INCH ON CHECKED BY ~ &~ ,_ l~ l.,,~~ - ~ ~-- -- ORIGINAL DRAWING. CIRCUIT MAP _C_-_ 1_4 _______ _
O 1" ATLAS NO H- 28, J-29

IF NOT ON E INCH ON

TH IS SHEET, ADJUST

SCALES ACCORDINGLY
SCALE

AS NOTED
DATE
05/11/23 ELECTRIC MANAGER -

ENGINEERING
(!)
6 = 1:,i:0:-~
ill
\
\
---
8053L
J29109
45'
59+0D
---
R
T6769L
100/167 /100
J29107
45'
City of Redding
Electric Utility
- -
Know what's below.

Call before you dig.

SHEET NOTES:
0 WORK LOCATION TAGS ADJACENT TO STREET LIGHTS ALSO INCLUDE CONDUIT, CONDUCTORS, AND BOXES ASSOCIATED WITH EACH STREET LIGHT.
0 CUSTOMER IS RESPONSIBLE FOR UNDERGROUND CONDUIT STUB UP AT NEW RISER LOCATION.

CUSTOMER SHALL COORDINATE WITH REU INSPECTOR AT (530) 510-3421 TO DETERMINE ACCEPTABLE POLE QUADRANT PRIOR TO INSTALLING NEW RISER. CUSTOMER SHALL COIL SUFFICIENT CONDUCTOR AT BASE OF POLE FOR REU INSTALLED RISER.

WORK BY REU
@iu.c-------
(3)-E762.30-CONN,SEC,3-TERM,#6-350KCML
(1)-NL6W-S-SL/NL SMALL LED W/6'ARM
(1)-USR-21-SINGLE PHASE RISER, SECONDARY 2"
TRINITY ST./CONTINENTAL ST,/BUTTE ST.

TRINITY ST. BIKEWAY LIGHTING
WORK-ORDER NO.
23-062
REVISION:

SHEET 5 OF 5

APPROVED
Packet Pg. 701 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid Negotiation No.5400, Trinity St. Bikeway Project)

SPECIFICATIONS
For

TRINITY STREET BIKEWAY PROJECT
(Job No. 8687)
BID NO. 5400
Prepared by:

City of Redding
Public Works Department
Engineering Division

Chuck Aukland, City Engineer Date
FOR INFORMATION CONCERNING THIS PROJECT, CONTACT:

Kristen Reagan, 530-225-4469, [email protected]

APPROVED
Packet Pg. 702 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 2 PROPOSAL DOCUMENTS (BOUND SEPARATELY)
ENGINEER’S ESTIMATE........................................................................................................ P1 PUBLIC CONTRACT CODES SECTIONS 10162 & 10232..................................................... P4 PUBLIC CONTRACT CODES SECTION 10285.1................................................................... P5 NONCOLLUSION AFFIDAVIT ................................................................................................ P6 LIST OF SUBCONTRACTORS............................................................................................... P7 SIGNATURE PAGE................................................................................................................. P8 BIDDER’S BOND .................................................................................................................... P9

SPECIAL PROVISIONS
NOTICE INVITING BIDS ........................................................................................................... 5 PUBLIC WORK AGREEMENT.................................................................................................11 PUBLIC WORKS PAYMENT (LABOR AND MATERIALS) BOND ..........................................13 PUBLIC WORKS PERFORMANCE BOND..............................................................................14 PUBLIC WORKS MAINTENANCE BOND ...............................................................................15 SUPPLEMENTAL DISPOSAL SITE AGREEMENT .................................................................16 SUBCONTRACTING REQUEST..............................................................................................18 TEMPORARY WASTEWATER DISCHARGE APPLICATION .................................................20 REFERENCE DOCUMENTS....................................................................................................22 PROJECT INTRODUCTION AND SPECIAL REQUIREMENTS...............................................23 SCOPE OF THE WORK........................................................................................................23 TIME OF COMPLETION .......................................................................................................23 MISCELLANEOUS REQUIREMENTS..................................................................................23 Preconstruction Conference...........................................................................................23 Watering ...........................................................................................................................23 Surface Mining and Reclamation Act .............................................................................24 Contract Provision Requiring Personal Certification of all Claims ..............................24 Construction Area Signs .................................................................................................24 Construction Project Funding Sign................................................................................25 Sound Control Requirements .........................................................................................25 Erosion Control................................................................................................................26 Local Topsoil....................................................................................................................30 Plastic Netting..................................................................................................................30 Fiber Rolls ........................................................................................................................30 As-Built/Record Documents............................................................................................31 Order of Work...................................................................................................................32 Notification of Work.........................................................................................................32

APPROVED
Packet Pg. 703 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 3 Contract Item List ............................................................................................................33 PART 1 GENERAL PROVISIONS............................................................................................47 SECTION 1 GENERAL .........................................................................................................47 SECTION 2 SCOPE OF WORK............................................................................................50 SECTION 3 CONTROL OF THE WORK...............................................................................56 SECTION 4 CONTROL OF MATERIALS .............................................................................67 SECTION 5 LEGAL RELATIONS & RESPONSIBILITIES....................................................67 SECTION 6 PROSECUTION AND PROGRESS...................................................................75 SECTION 7 MEASUREMENT AND PAYMENT....................................................................76 PART 2 MODIFICATIONS TO CONSTRUCTION MATERIALS...............................................80 SECTION 200 ROCK MATERIALS ......................................................................................80 SECTION 203 BITUMINOUS MATERIALS...........................................................................80 SECTION 207 GRAVITY PIPE..............................................................................................80 SECTION 210 PAINT AND PROTECTIVE COATINGS........................................................81 SECTION 217 BEDDING AND BACKFILL MATERIALS .....................................................82 PART 3 MODIFICATIONS TO CONSTRUCTION METHODS..................................................83 SECTION 300 EARTHWORK ...............................................................................................83 SECTION 301 SUBGRADE PREPARATION, TREATED MATERIALS, AND PLACEMENT OF BASE MATERIALS.........................................................................................................84 SECTION 302 ROADWAY SURFACING..............................................................................85 SECTION 303 CONCRETE AND MASONRY CONSTRUCTION..........................................86 SECTION 306 OPEN TRENCH CONDUIT CONSTRUCTION............................................88 SECTION 314 TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS........................................................................................................90 PART 4 EXISTING IMPROVEMENTS......................................................................................92 SECTION 400 PROTECTION AND RESTORATION .........................................................92 SECTION 402 UTILITIES......................................................................................................93 PART 6 TEMPORARY TRAFFIC CONTROL.......................................................................94 SECTION 600 ACCESS .....................................................................................................94 SECTION 601 TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION AND MAINTENANCE WORK ZONES...........................................................................................94 PART 7 STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS ...........................................96 SECTION 700 MATERIALS..................................................................................................96

APPROVED
Packet Pg. 704 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 4 Attachments
Caltrans Encroachment Permit 0223-NSN-0345...................................... Attachment A Drawings...................................................................................................... A-32883 to A-32908

APPROVED
Packet Pg. 705 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 5 NOTICE INVITING BIDS

TRINITY STREET BIKEWAY PROJECT
(Job No. 8687)
BID NO. 5400
In accordance with the Municipal Code of the City of Redding, sealed bids will be received at the office of the City Clerk, 777 Cypress Avenue, Redding, CA 96001, until 3 p.m., September 12, 2023. at which time they will be publicly opened and read for the performing of the work as follows:

New Class IV bike facility from Sundial Bridge Drive to Center Street, along Butte, Continental, and Trinity Streets. Project includes new signal at the intersection of Market and Trinity Streets.

The Engineer’s Estimate is $1,635,000. There are 55 working days.

The Contractor shall possess a valid Class A license at the time bid is opened.

No contractor or subcontractor may be listed on a bid proposal for this project unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. Failure to register prior to bid opening shall cause the bid to be deemed nonresponsive and no exception will be allowed including the renewal exception allowed in Labor Code Section 1725.5(c).

No contractor or subcontractor may work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

Each bid shall be made in accordance with the specifications and proposal requirements thereof and no bid will be received unless it is made on a proposal form furnished by the City Engineer.

Each bid must be accompanied by cash, certified or cashier’s check, or original bidder’s bond made payable to the City of Redding for an amount equal to at least ten percent (10%) of the total amount of the bid as a guarantee that the Contractor will execute the contract in conformance with his proposal and the specifications. Such Guarantee shall be forfeited should the bidder to whom the contract is awarded fail to enter into the contract.

The City of Redding hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, all businesses will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, gender, disability, or other protected class in consideration for an award.

The State of California general prevailing wage rate shall be the current prevailing wage for each craft, classification, or type of workman needed to execute the contract as determined by the Director of the California Department of Industrial Relations, pursuant to California Labor Code Part 7, Chapter 1, Sections 1770, 1773, and 1773.1. Copies of the current prevailing wage rates are available on their internet web site at:
www.dir.ca.gov/DLSR/PWD

APPROVED
Packet Pg. 706 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 6 Copies of referenced Standard Specifications for Public Works Construction, commonly called the “Greenbook,” 2021 Edition containing the General Provisions and Standard Technical Specifications may be obtained from Building News, Inc., 990 Park Center Drive, Suite E, Vista CA 92081 (888) 264-2665.

Plans, specifications, proposal, contract forms, and addenda may be obtained at www.cityofredding.org/pwbids at no charge. Supporting documents as required (i.e. environmental permits, geotechnical reports, record drawings, etc.) will also be posted on this site. Supporting and informational documents are for informational purposes only and for the convenience of the Bidders and are not considered a part of the Contract.

City bid documents are provided electronically and free of charge. It is the responsibility of each prospective bidder to verify the completeness of their printed bid documents before submitting their bid and accompanying executed addenda acknowledgement forms. Users are cautioned that City of Redding does not assume any liability or responsibility based on any defective or incomplete copying, excerpting, scanning, faxing, downloading, or printing of the contract documents.

The contract documents shall supersede any information posted or transmitted by www.cityofredding.org/pwbids.

Be advised that the information contained on www.cityofredding.org/pwbids may change and without notice to prospective bidders. It is the responsibility of each prospective bidder to check the City’s website www.cityofredding.org/pwbids on a daily basis through the close of bids for any applicable addenda or updates. Notifications updates, bidder inquiries, or addenda will not be provided via email or any other method.

For general information please contact the City of Redding Public Works – Engineering office at 530-225-4170. For technical questions please contact Kristen Reagan at 530-225-4469, [email protected]. Bids must be submitted on City supplied forms. No bid will be accepted from a contractor who is not licensed in accordance with the provisions of California Business and Professions Code Sections 7000 et seq. and regulations adopted by the Contractors’ State Licensing Board, as amended. The envelope enclosing the proposal shall have stated thereon, “Trinity Street Bikeway Project.” Project includes new signal at the intersection of Market and Trinity Streets and a signal upgrade and Butte and Continental Streets., (Bid No. 5400).”
The City Council of the City of Redding reserves the right to accept or reject any and/or all bids and to make that award which is in the best interest of the City.

CHUCK AUKLAND, CITY ENGINEER
Publishing Dates:

August 11, 2023

APPROVED
Packet Pg. 707 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 7 INSTRUCTIONS TO BIDDERS
A. INTRODUCTION
Each proposal shall be made in accordance with the specifications and contract documents prepared by the City of Redding, Public Works Department, Engineering Division, 777 Cypress Avenue, Redding, CA 96001.

B. BIDDER’S UNDERSTANDING
The Bidder shall examine carefully the site of the proposed work and the Contract Documents therefor. The submission of a proposal shall be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality and quantities of work to be performed and materials to be furnished, and as to the requirements of the contract documents.

C. PREPARATION AND SUBMISSION OF PROPOSALS
Proposals shall be submitted on the forms provided by the City Engineer and must be signed by the Bidder or his authorized representative. When signing the proposal, please set forth whether the entity/individual is a corporation, a partnership, a joint venture, a sole proprietorship, etc. The name of the person signing the documents, as well as their authorized capacity, must be typed or printed below the signature. Any corrections to entries made on proposal forms shall be initialed by the person signing the proposal.

Bidders must quote on all items appearing on the Proposal form, unless specific directions allow for partial bids. Failure to quote an item means that the item will be provided at no cost. The bidder shall legibly enter unit or lump sum price in figures, for all items required on the Proposal.

When bids on all items are not required, Bidders shall insert the words “NO BID” where appropriate. In case of discrepancy, between unit prices and totals, unit prices will prevail. Failure to legibly quote on items may disqualify the bid. Alternate bids will not be considered unless specifically called for in the proposal form.

Telegraphic and facsimile proposals will not be considered.

In order to insure consideration, the proposal shall be enclosed in a sealed envelope clearly marked PROPOSAL, including the name of the job, and the opening date and filed with the City Clerk, City of Redding, 777 Cypress Avenue, Redding, CA 96001, before the time set forth in the Notice Inviting Bids. Proposals received after the time indicated will be returned unopened whether or not bids are opened exactly at the time fixed in the Notice Inviting Bids.

D. PROPOSAL GUARANTY
All Bids shall be accompanied by cash, certified check, cashier’s check, or bidder’s bond executed by a lawfully authorized surety company, made payable to the City of Redding.

The Proposal Guaranty must be enclosed in the same envelope with the proposal. The amount of the Proposal Guaranty shall not be less than 10 percent of the total amount of the Proposal unless otherwise noted in the Notice Inviting Bids. The Proposal will not be considered unless one of the forms of Proposal Guaranty is enclosed with it. Bidder’s Bond shall be dated.

APPROVED
Packet Pg. 708 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 8 A Bidder’s Bond will be accepted only if it is an original made out on either the Bidder’s bond form enclosed in these documents or on a form which conforms to it. Bidder’s Bond shall be signed by Bidder and by Surety. Surety’s signature shall be notarized and the proof of notary and the power of attorney shall also be original and attached to the original bond at the time the bid is opened. Copies will not be accepted in satisfaction of these requirements.

E. PUBLIC WORKS CONTRACTOR REGISTRATION PROGRAM
All contractors and subcontractors who bid or work on a public works project must register with the Director Industrial Relations (DIR) at:
http://www.dir.ca.gov/Public-Works/PublicWorks.html
The City will not accept a bid with, enter into a contract with, or allow work on a project from an unregistered contractor. Failure of a prime contractor to register prior to bid opening shall cause the bid to be deemed nonresponsive by the City and no exception will be allowed including the renewal exception allowed in Labor Code Section 1725.5(c).

An inadvertent error in listing a subcontractor who is not registered pursuant to Labor Code Section 1725.5 in a bid proposal will be allowed, provided that within 24 hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in subparagraph (E) of paragraph (2) of subdivision (a) of Labor Code Section 1725.5.

F. LIST OF SUBCONTRACTORS
Each bidder shall submit with his Proposal a list of subcontractors in conformance with Section 3-3, “Subcontractors,” of the Standard Specifications. Public Contract Code Section 4104 requires contractors to list subcontractor license numbers at time of bid. Failure to list the license number shall cause the bid to be deemed nonresponsive.

Subcontractor may be listed on more than one Prime Contractor bid.

G. ADDENDA AND EXPLANATIONS TO BIDDERS
Any explanation regarding the meaning or interpretation of plans, specifications, or other Contract Document shall be requested in writing, with sufficient allowance of time for receipt of reply before the time set for opening of proposals. Any such explanations or interpretations will be made in the form of Addenda to the documents and will be furnished to all listed planholders. Bidders shall acknowledge receipt via email at [email protected] of all Addenda posted on www.cityofredding.org/pwbids prior to bid opening. Failure to acknowledge receipt of all Addenda via email shall cause the bid to be nonresponsive and may be rejected. Oral explanations and interpretations shall not be binding.

All bidder inquiries must be received 7 calendar days prior to the bid opening.

APPROVED
Packet Pg. 709 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 9 H. CORRECTION OF WITHDRAWAL OF PROPOSALS
Bid proposal packets shall be submitted to the City Clerk’s office prior to the closing date and time indicated in the Notice Inviting Bids. Bid proposal packets shall not be considered as officially submitted until the Clerk’s office has stamped and accepted the proposals. Once bid proposal packets are officially received, the packets shall not be returned to the bidder and any changes or corrections to the bid proposal shall only be allowed as follows:

1. Request for Correction to Bid Proposal
Any changes or corrections to the bid proposal shall be made in writing, shall clearly define the nature of the changes, and shall be hand delivered to the City Clerk’s office in person prior to the official closing time for submitting proposals. The written changes or corrections shall be submitted in a sealed envelope which has the bidders name and bid schedule number clearly marked on the outside. The envelope shall also clearly indicate on the front that it contains a correction to the original bid.

The Clerk’s office shall stamp the new envelope as “Received” and sign and date the front of the envelope. The bidder (or the bidder’s representative) and the office staff person shall both sign, date, and print their names over the seal of both the original bid proposal packet and the new envelope containing the corrected documents as evidence that the two envelopes where not opened. In the presence of the bidder (or the bidder’s representative), the office staff person shall staple the new envelope to the original bid proposal packet.

At the bid opening, the person supervising the bid opening shall open and publicly announce the contents of both the original bid proposal packet and the new envelope with the corrections. The material in both envelopes shall be treated as one document and the correction document shall take precedence in determining the corrected bid amount. The Clerk’s office shall maintain both documents in the bid file along with both sides of the envelopment.

2. Request for Withdrawal of Bid Prior to Bid Opening
Requests for withdrawal of bids shall be made either in person or in writing. No telephonic requests, FAX transmittals, or emails shall be considered for the withdrawal of a bid.

If the request is made in person, the requesting party and the office staff person processing the request shall both sign their names and write the date over the seal on the bid proposal envelope as evidence that it was not opened. The office staff person shall then write on the front of the bid proposal envelope “Bid requested to be withdrawn on [date] by [printed name of requesting party].” The office staff person and the requesting party shall then sign, date and print their names on the front of the bid proposal envelope. A copy of the front and back of the bid envelope shall be kept in the bid file.

If the request is made in writing, the office staff person shall sign his/her name and write the date over the seal of the bid proposal envelope. The office staff person shall then write on the front of the bid proposal envelope “Bid requested to be withdrawn by letter from [name] dated [date].” The office staff person shall then sign, date, and print his/her name on the front of the bid proposal envelope and shall staple a copy of the letter

APPROVED
Packet Pg. 710 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 10 requesting the bid withdrawal to the bid proposal envelope. The original letter and a copy of the front and back of the signed bid envelope shall be kept in the bid file.

At the bid opening, the bid proposal packet will NOT be opened. The bid proposal packet and a copy of the letter requesting withdrawal, if any, shall be returned unopened to the bidder in the same manner as bid securities are returned to unsuccessful bidders.

I. BID OPENING
At the time and place fixed for opening of Proposals, the contents of all proposals will be read publicly. All bidders and other interested parties are invited to be present in person or by representatives.

J. PLANS AND SPECIFICATIONS
Upon request, the Contractor will be provided five (5) sets of plans (11 x 17) and specifications at the Preconstruction Conference. Additional sets will be available from the Engineer at the Contractor’s expense.

APPROVED
Packet Pg. 711 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid

PUBLIC WORK AGREEMENT
THIS AGREEMENT, made and entered into in duplicate, on the date below written, by and between the CITY OF REDDING, State of California, a Municipal Corporation and General Law, City through its City Council, hereinafter referred to as City, and Contractor
Address
City
hereinafter referred to as Contractor.

WITNESSETH, that, for the considerations hereinafter mentioned, the City and the Contractor agree as follows:

The Contractor agrees, at his own expense, to furnish all labor, materials, tools and equipment, and to perform all the work required to construct and complete in good and workmanlike manner, in strict accordance with the Contract Documents, and to the satisfaction of the City, those improvements entitled:

Project Title
Bid No. #
Job No. #

The Contract Documents herein referred to consist of the following document:

Notice Inviting Bids
Instructions to Bidders
Proposal
Bidder’s Bond
Agreement
Payment Bond
Performance Bond`
General Provisions
Special Provisions
Addendum
Contract Drawings
Public Liability Insurance
Fire Insurance
Workers’ Compensation Insurance
It is expressly agreed between the parties hereto that should there be any conflict between the terms of this instrument, or any of the other Contract Documents, and the bid or proposal of the Contractor, then this instrument, together with the other Contract Documents, shall control and nothing therein shall be considered as an acceptance of the terms of said bid or proposal of said Contractor.

The City shall make payments on the account of the Contract as specified in the General Provisions.

Except as provided in Section 12940 et seq. of the Government Code, Contractor shall not discriminate against any person because of his/her race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sexual orientation, domestic partners, sex gender identify, gender expression, age or other protected class nor refuse to hire or employ the person or to refuse to select the person for a training program leading to employment, or to discriminate against the person in compensation or in terms, conditions or privileges of employment. The Contractor shall insert in all subcontracts for any work covered by this [agreement/contract] this nondiscrimination provisions.

APPROVED
Packet Pg. 712 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid The City agrees to pay the Contractor for the performance of the contract, subject to additions and deductions provided therein, the following prices, and the Contractor agrees to receive and accept said following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement, and for all loss or damage arising out of the nature of the aforesaid work or from the action of the elements and from any unforeseen difficulties or obstructions which may arise our be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work, and for all expenses incurred by or in consequence of the suspension or discontinuance of the work and for well and faithfully completing the work and the whole thereof in the manner and according to the Contract Documents and the requirements of the City Engineer, to wit:

The Contractor shall commence work within the time period set forth in the General Provisions and shall diligently prosecute the same to completion within ________ (__) working days from the date of the commencement of work.

IN WITNESS WHEREOF, the parties to these presents have hereto set our hands and seals this ___ day of ________, 2023.

APPROVED AS TO FORM:

By:

CITY OF REDDING
By:

City Attorney Mayor
Name of Contractor
ATTEST:

By:

Type of Entity
City Clerk Taxpayer Identification
By:
“Name” as Filed with IRS
By:

Contractor
By:
(Seal)

APPROVED
Packet Pg. 713 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 13 BOND NO.:

PUBLIC WORKS PAYMENT (LABOR AND MATERIALS) BOND
KNOW ALL MEN BY THESE PRESENTS:

THAT WHEREAS, athe City Council of the City fo Redding, a Municipal Corporation, in the State of California as Owner, has on , conditionally awarded to as Principal, a Contract to do and perform the following work to-wit:
as will more full appear in said Contract, the terms and conditions of said contract being fully incorporatred herein by this reference; and
WHEREASE, under the terms of the Contract and pursuant to Chapter 5 of Title 3 of Part 6 of Division 4 of the California Civil Code (commencing with Civil Code 9550), Principal is required to furnish a good and sufficient payment bond to secure payment of the claims to which reference is made in Civil Code Section 9554; NOW, THEREFORE, we, the Principal and , a corporation duly authorized and admitted to transact business and issue surety bonds in the State of California, hereinafter call Surety, are held and firmly bound unto the Owner, and unto all persons or entities entitled to assert a claim against a payment bond under any of the aforesaid Civil Code provisions in the penal sum of Dollars ($ ) lawful
money of the United States of America, for the payment whereof, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLICATION IS SUCH, that if said Principal, his or its heirs, executors, administrators, successors or assigns, or subcontractors, shall fail to pay for any materials or equipment furnished or used in performance of the Contract, or for any work or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, or for any amounts required to be deducted, withheld, and paid over to the Franchise Tax Board or the Employment Development Department from wages of employees of the Contractor and all subcontractors with respect to such work or labor, then the Surety shall pay the same in an amount not to exceed the sum specified above. If suit is brought upon this bond, Surety shall pay, in addition to the above sum, all costs, expenses and fees, including attorney’s fees, reasonably incurred by any party in successfully enforcing the obligation secured hereby, all to be taxed as costs and included in any judgment rendered. Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect, and shall bind Contractor, Surety, their heirs, executors, administrators, successors and assigns, jointly and severally.

It is hereby stipulated and agreed that this bond shall insure to the benefit of all persons, companies, corporations, political subdivisions, State agencies and other entities entitled to assert a claim against a payment bond under any of the aforesaid Civil Code provisions, so as to give a right of action to them or their assigns in any suit brought upon this bond. The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed thereunder or to the specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension, alteration, or addition. Furthermore, and for valuable considerations, Surety hereby waives the provisions of California Civil Code Sections 2819, 2845, and 2849.

IN WITNESS WHEREOF, we have hereto set our hands and seals on this day of , .

APPROVED AS TO FORM:

Principal
City Attorney By:

ATTEST: (Seal)
Pamela Mize, City Clerk Name of Surety
By: (Seal)
Attorney-In-Fact

APPROVED
Packet Pg. 714 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 14 Bond No.:

PUBLIC WORKS PERFORMANCE BOND

KNOW ALL MEN BY THESE PRESENTS
THAT WHEREAS, the City Council of City of Redding, a Municipal corporation, as Owner, at its regular meeting held on , has awarded to as Principal, a contract to do and perform the following work to-wit:
as will more fully appear in said contract, the terms and conditions of said contract being fully incorporated herein by this reference.

WHEREAS, said Principal is required under terms of said contract to furnish a bond for the faithful performance of said contract;
NOW, THEREFORE, we, the Principal and as Surety, are held and firmly bound unto the Owner in the sum of ($ ) lawful money of the United States of America, for the payment whereof, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal, his or its heirs, executors, administrators, successors or assigns, or subcontractors, shall in all things stand to and abide by, and well truly keep and perform the covenants, conditions, and agreements in the said contract and any alteration thereof as there provided, on his or their part, to be kept and performed at the time and in the manner therein specified and in all respects according to their true intent and meaning and shall indemnify and save harmless the Owner, its officers, and agents as therein stipulated then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue.

As the Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications.

If said Owner shall require any further or other bond for its protection in the premises, such further or other bond shall be furnished by the Principal with Surety or Sureties satisfactory to the Owner within ten days after notice of such requirement is given to the Principal, and in case of failure on the part of the Principal to comply with said requirement, the Owner shall have the right, at its option, to terminate said contract with said Principal.

IN WITNESS WHEREOF, we have hereto set our hands and seals on this day of , .

APPROVED AS TO FORM:

Principal
City Attorney By:

ATTEST: (Seal)
Pamela Mize, City Clerk Name of Surety
By: (Seal)
Attorney-In-Fact

APPROVED
Packet Pg. 715 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 15 Bond No.:

PUBLIC WORKS MAINTENANCE BOND

KNOW ALL MEN BY THESE PRESENTS
THAT WE, the undersigned, as Principal, and
a corporation organized and existing under the laws of the State of California, and authorized to do business in the State of California, as Surety, are held and firmly bound unto the CITY OF REDDING, hereinafter called Obligee, in the sum of ( )
Dollars, lawful money of the United States of America, for the payment of which well and truly to be made, we do hereby jointly and severally bind ourselves, our heirs executors, administrators, successors, and assigns firmly by these presents.

WHEREAS, said Principal has heretofore entered into a contract with the Obligee above named for , and
WHEREAS, the work called for under said contract has been completed and accepted by said Obligee:

NOW, THEREFIREM THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal shall, for a period of one year(s) from and after the day of , , \indemnify the Obligee against any loss or damage directly arising by reason of any defect in the material or workmanship which may be discovered within the period aforesaid, then this obligation shall be void; otherwise the same shall remain in full force and effect.

IN WITNESS WHEREOF, we have hereto set our hands and seals on this day of , .

APPROVED AS TO FORM:

Principal
City Attorney By:

ATTEST: (Seal)
Pamela Mize, City Clerk Name of Surety
By: (Seal)
Attorney-In-Fact

APPROVED
Packet Pg. 716 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 16 SUPPLEMENTAL DISPOSAL SITE AGREEMENT
Contract Bid No.:

Job No.:

Chuck Aukland
City Engineer
777 Cypress Avenue
Redding, CA 96001
Dear Sir:

In accordance with Section 401, Removal, of the Standard Specifications, the following agreement for usage of the disposal site for subject contract is submitted, as required prior to disposal of said materials.

WHEREAS, Contractor has entered into Contract B/S No. with the City of Redding, hereinafter called “City,” for the performance of work on , and
WHEREAS, pursuant to the authority of said Contract, ,
Contractor, and , Owner have entered into an
agreement under which Contractor may dispose of materials on Owner’s Property.

NOW THEREFORE, pursuant to said Contract B/S No. Contractor and Owner hereby notify the City that disposal of materials by Contractor on Owner’s property located at will be done pursuant to agreement
between Contractor and Owner and not pursuant to the arrangement between the City and Owner, dated , and Owner specifically agrees that the City is hereby released from any and all obligations to Owner under the City’s said arrangement with Owner.

Date Owner
Date Contractor
By:

Authorized Agent
Title
c: City Engineer
Contractor
Property Owner
Resident Engineer

APPROVED
Packet Pg. 717 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 17 CONTRACT PROVISION REQUIRING PERSONAL CERTIFICATION OF ALL CLAIMS:

I, , being the
(must be an officer) of
(General Contractor), declare under penalty of perjury under the laws of the State of California, and do personally certify and attest that I have thoroughly reviewed the attached claim for additional compensation and/or extension of time, and know it’s contents, and said claim is made in good faith; the supporting data is truthful and accurate/that the amount requested accurately reflects the contract adjustment for which the Contractor believes the owner is liable; and, further, that I am familiar with California Penal Code Section 72, pertaining to false claims, and further know and understand that submission or certification of a false claim may lead to fines, imprisonment and/or other severe legal consequences.

Submission of a claim, properly certified, with all required supporting documentation and written rejection or denial of all or part of the claim by owner, is a condition precedent to any action, proceeding, litigation, suit, or demand for arbitration by Contractor.

APPROVED
Packet Pg. 718 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 18 SUBCONTRACTING REQUEST
Project:

Contractor Name & Address:

Subcontractors
(Name, Business, Address, Phone)
Bid Item
Number(s)
% of Bid Item
Subcontracted
Describe Work When Less
than 100% of Work is
Subcontracted
Dollar Amount Based on Bid
Amount
I certify that the Standard Specifications and Special Provisions for labor set forth in the contract apply to the subcontracted work.

Contractor Signature: Date:

This section is to be completed by the Resident Engineer

1. Total of Bid Items $

2. Specialty items previously approved (if applicable, see note in the instructions) $

3. Total (lines 1+2) $

4. Contractor must perform with own forces (lines 1 minus 2) x % $

5. Bid items subcontracted $

6. Balance of work Contractor to perform (line 1 minus 5) $ Approved:

Resident Engineer Date:

APPROVED
Packet Pg. 719 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 19 INSTRUCTIONS FOR COMPLETING SUBCONTRACTING REQUEST FORM All First-tier subcontractors shall be included on a subcontracting request.

Submit in accordance with Section 1-6 of these Special Provisions. Type or print requested information. A copy is to be retained by the Contractor. Submit to project’s Resident Engineer.

After approval, the original will be returned to the Contractor.

When an entire item is subcontracted, the value to be shown is the Contractor’s bid price. When a portion of an item is subcontracted, describe the portion, and show the percent of bid item and value.

APPROVED
Packet Pg. 720 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 20 Return completed application to:

City of Redding, Public Works
Industrial Waste Division
P.O. Box 496071
Redding, CA 96049-6071
530-224-4319 Fax 530-224-6052

TEMPORARY WASTEWATER DISCHARGE APPLICATION
Submit at least two weeks prior to anticipated discharge to the Public Works Industrial Waste Division.

Type or print clearly, attach additional sheets if necessary.

Company Name: Site Address: Telephone:

Responsible Party: Mailing Address, City, State, Zip: Telephone:

Contact Person:

Cell phone:

Mailing Address, City, State, Zip:

Email:

Telephone:

Fax:

Property Owner: Mailing Address, City, State, Zip: Telephone:

Emergency Contact Person: Title: Telephone: After hour phone:

Correspondence to be sent to: ☐ Responsible Party ☐ Contact Person ☐ Property Owner ☐ Other:

Billing to be sent to: ☐ Responsible Party ☐ Contact Person ☐ Property Owner ☐ Other:

I have read this application and the attached material. The information provided is accurate and complete.

Signature: Printed Name, Title Date
Nature of discharge: ☐ Groundwater well purge for sampling ☐ Excavation Water ☐ Tank Cleaning Water ☐ Other:____________________________________________________________________________ Type of Contamination: ☐ Petroleum products ☐ Sediment ☐ Chlorine ☐ Other:_______________________ Description of liquid treatment, storage, and disposal activity:

Discharge will be: ☐ Intermittent ☐ Continuous Flow rate: _________ gal/minute ☐ Estimated ☐ Measured Total Volume: __________ gal ☐ Estimated ☐ Measured Proposed Discharge Dates from: _________ to __________ Discharge location (submit site layout drawing(s), including discharge and sample points):

Pollutants and concentrations (submit analytical results):

Solid residue disposal method:

Notes:

A
C
B

APPROVED
Packet Pg. 721 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 21 Site proposing temporary discharge must be connected to the City of Redding sanitary sewer.

Sewer Account No.: Billed to:

Other businesses on account:

List other environmental control permits held by this operation:

EPA ID Number:

Notes:

Office Use Only
Received by: Permit Number: Issue Date: Expiration Date: Manhole Number:

WWTP:
☐ Stillwater
☐ Clear Creek
Permit Fee:
$500 billed by City
Industrial Waste at
the end of the
project.

Volume
Discharge:

Unit Cost: Volume Cost:
$6.59/CCF
(CCF = 748 gallons)
$8.81/1000 gallons
Prices valid through
12/31/23
Connection Fee: Total Cost:

Billed at the end
of the project
Notes: Volume cost is waived on water and sewer line projects managed by the City of Redding Public Works Department.

Supplemental Information Required:
☒ Plumbing Plans ☒ Site Plan ☒ Pretreatment Facilities ☐ Water Meter on Site ☐ City Meter Needed Analytical Reports Required: ☐ Petroleum Products ☐ Solids ☐ Chlorine Residual ☐ Other Notes:

Date Requested: Date Received: Approved by: Approval Date:

D

APPROVED
Packet Pg. 722 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 22 REFERENCE DOCUMENTS
Standard Specifications for Public Works Construction
Standard Specifications for Public Works Construction (SSPWC) the “Greenbook,” 2021 Edition and current supplements as amended, prepared by the Southern California Chapter of American Public Works Association, and the Southern California District, Associated General Contractors of California, relates to the Work of this Project and is hereby made a part of this Contract as though fully contained herein.

The Contractor is hereby specifically directed, as a condition of the Contract, to obtain the necessary number of copies of Standard Specifications for Public Works Construction, to acquaint himself with the Articles contained therein, and to notify and apprise all subcontractors and any other parties to the Contract, or individuals or agencies engaged in the work, as to its contents.

No contractual adjustments shall be due or become critical as a result of failure on the part of the Contractor to fully acquaint himself with the conditions of Standard Specifications for Public Works Construction.

Copies of Standard Specifications for Public Works Construction commonly called the “Greenbook,” 2021 Edition and current supplements, may be obtained from Building News, Inc., 990 Park Center Drive Suite E, Vista, CA (888) 264-2665.

City of Redding Construction Standards
The documents hereinafter referred to as the “City Standards” shall be the current version posted on the City of Redding website:
https://www.cityofredding.org/departments/public-works/engineering/construction-standards Other Reference Specifications
Where other reference specifications such as those of ASTM, AASHTO, etc., have been referred to, the applicable portion of such specifications shall become a part of these Contract Documents.

In case of conflict between the Standard Specifications and these special provisions, the special provisions shall take precedence over and be used in lieu of the conflicting portions.

APPROVED
Packet Pg. 723 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 23 PROJECT INTRODUCTION AND SPECIAL REQUIREMENTS

SCOPE OF THE WORK
The work to be performed under this contract consists of the following:

New Class IV bike facility from Sundial Bridge Drive to Center Street, along Butte, Continental, and Trinity Streets. Project includes new signal at the intersection of Market and Trinity Streets.

TIME OF COMPLETION
Attention is directed to Sections 6-1 and 6-3 of the General Provisions, “Construction Schedule and Commencement of Work” and “Time of Completion.” In accordance with the provisions of these Subsections, the Contractor shall begin work within fifteen (15) days after the date of the Notice to Proceed and thereafter diligently prosecute the same to completion within a period not to exceed fifty-five (55) working days. The contract time shall commence on the fifteenth day after the Notice to Proceed or on the date of commencement of the work, whichever occurs first.

MISCELLANEOUS REQUIREMENTS
Preconstruction Conference
A meeting will be scheduled between staff and the successful bidder at a time and place determined by the Engineer to review the project plans, specifications, and any special requirements of the funding program.

Attention is directed to Caltrans Encroachment Permit No 0223-NSN-0345 “Prior to Work” for additional requirements.

Watering
Watering shall consist of developing a water supply and furnishing all water required for the work, including water used in the performance of work paid for as extra work, and applying all water.

Developing a water supply may include obtaining water for contract purposes from fire hydrant(s) located at or near the work site as determined by the City of Redding Water Division or from private sources provided by the Contractor at his expense. If he obtains water from a fire hydrant, the Contractor shall install a hydrant meter and control valve on the fire hydrant designated as the water source. The Contractor shall obtain the hydrant meter and control valve from the City of Redding Water Division.

The cost of the hydrant meter and control valve are as follows:
$25.00 (nonrefundable; payable when picked up)
$225.00 (refundable deposit for any nonpayment on account and/or repairs to hydrant meter and control valve; payable when picked up)
$276.50 (monthly charge for 3-inch hydrant meter and control valve; billed monthly)

APPROVED
Packet Pg. 724 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 24 The cost of water is $1.59/CCF.

In the event that a water truck or tank is filled directly from a fire hydrant, there shall be either an air gap or a backflow device acceptable to the City Water Division on the filler pipe.

Full compensation for developing a sufficient supply of water required for the work shall be considered as included in the prices paid for the various contract items of work involving the use of water and no separate payment will be made therefor.

Full compensation for applying water will be considered as included in the prices paid for the various contract items requiring water and no separate payment will be made therefor, except that applying water for work paid for extra work in accordance with Section 7-4, “Payment for Extra Work,” will be paid for as a part of said extra work.

Surface Mining and Reclamation Act
Attention is directed to the Surface Mining and Reclamation Act of 1975, commencing in Public Resources Code, Mining, and Geology, Section 2710, which establishes regulations pertinent to surface mining operations.

Material from mining operations furnished for this project shall only come from permitted sites in compliance with the Surface Mining and Reclamation Act of 1975, and listed in the California Department of Conservation’s Office of Mine Reclamation 3098 list.

The requirements of this section shall apply to all materials furnished for the project, except that the Contractor, with the approval of the Engineer, may use in the proposed construction such stone gravel, sand, or other material suitable in the opinion of the Engineer as may be found in excavation. The Contractor will be paid for the excavation of those materials at the contract price for excavation, but the Contractor shall replace at the Contractor’s expense with other suitable material all of that portion of the material so removed and used which was contemplated for use in the work, except that the Contractor need not replace, at the Contractor’s expense, any material obtained from structure excavation used as structure backfill. No charge for materials so used will be made against the Contractor. The Contractor shall not excavate or remove any material from within the project location that is not within the excavation, as indicated by the slope and grade lines, without written authorization from the Engineer.

Contract Provision Requiring Personal Certification of all Claims The Contractor’s attention is directed to the Contract Provision Requiring Personal Certification of all Claims found in the Agreement. The Contract Provision Requiring Personal Certification of all Claims shall be completed and included with any claim for additional compensation and/or extension of time.

Construction Area Signs
Construction area signs shall be furnished, installed, maintained, and removed when no longer required in conformance with the plans and these special provisions. The Contractor shall be fully and completely responsible for the furnishing, installing, and maintaining all construction area signing. This requirement shall apply continuously and not be limited to working hours.

The Contractor shall notify the appropriate regional notification center for operators of subsurface installations at least 2 working days, but not more than 14 calendar days, prior to commencing

APPROVED
Packet Pg. 725 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 25 excavation for construction area sign posts. The regional notification centers include, but are not limited to, the following:

Notification Center Telephone Number
Underground Service Alert-Northern California (USA) 811 Excavations required to install construction area signs shall be performed by hand methods without the use of power equipment, except that power equipment may be used if it is determined there are no utility facilities in the area of the proposed post holes.

The contract unit price paid for “Construction Area Signs” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all the work involved in construction area signs, complete in place, as shown on the plans, as specified in these special provisions, and as directed by the Engineer.

Construction Project Funding Sign
Before any major physical construction work readily visible to the public is started on this contract, the Contractor shall furnish and erect Construction Project Funding Identification Signs at the locations designated by the Engineer.

The signs shall be of a type and material consistent with the estimated time of completion of the project and shall conform to the detail shown on the plans. The sign letters and City of Redding logo shall conform to the colors and details shown on the plans and shall be on a white background (non-reflective). The letter sizes to be used shall be as shown on the plans. The information shown on the signs shall be limited to that shown on the plans. The signs shall be kept clean and in good repair by the Contractor during the course of construction.

Upon completion of the work, it shall be the Contractor’s responsibility to remove and dispose of the signs per the contract specifications.

The lump sum paid for “Project Funding Sign” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all the work involved in constructing and installing construction project funding signs, complete in place, as shown on the plans, as specified in these special provisions, and as directed by the Engineer.

Sound Control Requirements
The noise level from the Contractor’s operations, between the hours of 8:00 p.m. and 7:00 a.m., shall not exceed 86 dbA at a distance of 50 feet without the written approval of the Engineer. This requirement in no way relieves the Contractor from responsibility for complying with local ordinances regulating noise level.

Said noise level requirement shall apply to all equipment on the job or related to the job, including but not limited to trucks, transit mixers, or transient equipment that may or may not be owned by the Contractor. The use of loud sound signals shall be avoided in favor of light warnings except those required by safety laws for the protection of personnel.

APPROVED
Packet Pg. 726 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 26 Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.

Erosion Control
Erosion Control shall conform to the provisions in Section 3-12.6, “Water Pollution Control,” of these special provisions and shall consist of applying Erosion Control materials to the areas shown on the plans, embankment and excavation slopes and other areas disturbed by construction activities and as directed by the Engineer.

Erosion Control is to be placed between September 1st and March 15th. Areas completed and ready for application of Erosion Control outside of these dates shall be temporarily stabilized until the acceptable window begins, or as directed by the Engineer. Areas may be temporarily stabilized using soil binders, temporary seed and straw, or just straw. Prior to application of permanent seed, areas temporarily stabilized using soil binders must be scarified by track walking or other means to break up crusted soils. If areas were temporarily stabilized using seed and straw or just straw, the straw and thick vegetation must be removed and soils scarified prior to application of permanent seed. Topsoil shall be placed in those areas to receive permanent stabilization prior to application of permanent seed, or as directed by the Engineer.

Erosion control materials shall consist of seed, fertilizer, fiber, straw, and tackifier.

Seed is required to be labeled under the California Food and Agricultural Code and shall be labeled by the vendors supplying the seed. Seed shall have been tested for purity and germination not more than 12 months prior to the application of the seed. Seed labels furnished by the vendors shall indicate the purity, germination, and pure live seed (PLS) as determined by testing. Results from testing the seed for purity and germination shall be furnished to the Engineer prior to applying seed.

Seed shall be delivered to the job site in unopened separate containers with the seed tag attached. Containers without a seed tag will not be accepted.

Seed for erosion control work shall consist of one or more of the following types:

Temporary
Seed for temporary erosion control work shall consist of the following mix:

Species Lbs. PLS/Acre
Hordeum vulgare 250
Permanent
Seed for permanent erosion control work shall consist of the following mix:

Species Lbs. PLS/Acre
Achillea millefolium 2

APPROVED
Packet Pg. 727 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 27 Bromus carinatus 15
Eschscholzia californica 3
Trifolium willdenovii 5
Festuca microstachy 5
Hordeum vulgare 100
Total 130
Fertilizer shall consist of a natural based product with a slow release formulation of 7-2-3 (N-PK), 10 percent sulfur is optional, or as approved by the Engineer. Fertilizer for erosion control work shall conform to the requirements of the California Food and Agricultural Code, shall be in pelleted or granular form for hydroseeding, and shall have a minimum guaranteed chemical analysis of 7 percent nitrogen, 2 percent phosphoric acid, 3 percent water soluble potash, and 10 percent sulfur. Fertilizer shall be a formulation suitable for hydroseeding purposes and soluble in water.

Straw for erosion control work shall be sterile upland straw, dry oat, wheat, or rice straw, free from weeds and foreign matter detrimental to plant life. The Contractor shall furnish evidence that clearance has been obtained from the County Agricultural Commissioner, as required by law, before straw obtained from outside the County is delivered to the site of the work. Straw that has been used for stable bedding shall not be used. Hay or chopped cornstalks are not acceptable.

Straw shall be chopped and uniformly applied at a rate specified in this section.

Fiber must be wood fiber, cellulose fiber, alternate fiber, or a combination of these fibers. • Wood fiber must be long strand, whole wood fiber thermomechanically processed from clean whole wood chips.
• Cellulose fiber must be made from natural or recycled pulp fiber, such as wood chips, sawdust, newsprint, chipboard, corrugated cardboard, or a combination of these materials. • Alternate fiber must be a long strand, whole natural fiber made from clean straw, cotton, corn, or other natural feed stock.

Fiber must:

1. Disperse into a uniform slurry when mixed with water.

2. Contain ¾-inch fiber strands for at least 25 percent by total volume.

3. Have at least 40 percent retained when passed through a No. 25 sieve.

4. Have an initial moisture content of no more than 15 percent of its dry weight when tested under CA Test 226. The moisture content must be marked on the packaging.

APPROVED
Packet Pg. 728 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 28 5. Have a water holding capacity, by weight, of at least 1,200 percent when tested under the procedure designated in Caltrans final report, CA-DOT-TL-2176-1-76-36, “Water holding capacity for hydromulch,” available from METS.

6. Be nontoxic to plants and animal life.

7. Be free of synthetic or plastic materials, lead paint, printing ink, varnish, petroleum products, seed germination inhibitors, and chlorine bleach.

8. Contain less than 250 parts per million of boron.

9. Contain less than 7 percent ash when tested under the Technical Association of the Pulp and Paper Industry, TAPPI Standard T 413.

10. Be colored to contrast with the area on which the fiber is to be applied. The coloring agent must be biodegradable, nontoxic, and free from copper, mercury, and arsenic and must not stain concrete or painted surfaces.

Fiber for temporary hydraulic mulch must be at least 50 percent wood fiber. The remaining percentage must be cellulose fiber, alternate fiber, or a combination.

Tackifier must be:

1. Free from growth or germination inhibiting factors.

2. Nonflamable.

3. Nontoxic to aquatic organisms.

4. Functional for a minimum of 180 days.

General purpose tackifier may be either a plant-based product or a polymeric emulsion blend as follows:

1. Plant based tackifier must be a natural high molecular weight polysaccharide. A high viscosity hydrocolloid that is miscible in water, and labeled as either guar, psyllium, or starch, as follows:

1.1. Guar gum-based product must be derived from the ground endosperm of the guar plant, Cyanmopsis tetragonolobus. It must be treated with dispersing agents for easy mixing. It must be able to be diluted at the rate of 1 to 5 pounds per 100 gallons of water.

1.2. Psyllium based product must be manufactured from the finely ground, mucilloid coating of Plantago ovata or Plantago ispaghula seeds and able seeds and able to dry and form a firm but rewettable membrane.

1.3. Starch based product must be a nonionic, water-soluble, granular material derived from corn, potato, or other plant-based source.

2. Polymeric emulsion blend tackifier must be a prepackaged liquid or dry powder, aniomic formulation with a residual monomer content not exceeding 0.05 percent by weight. The

APPROVED
Packet Pg. 729 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 29 tackifier must contain and be labeled with one of the following as the primary active ingredients:

2.1. Acrylic copolymers and polymers.

2.2. Polymers of methacrylates and acrylates.

2.3. Copolymers of sodium acrylates and acrylamides.

2.4. Polyacrylamide and copolymer of acrylamide.

2.5. Hydrocolloid polymers.

Erosion control materials shall be applied in separate applications in the following sequence:

A. The following seed and fertilizer mixture shall be applied with hydro-seeding equipment within 30 minutes after the seed has been added to the mixture:

Material Temporary Pounds
Per Acre (Minimum)
Permanent Pounds
Per Acre (Minimum)
Seed 250 130
Commercial Fertilizer 600 600
Fiber 125 125
B. Straw shall be applied at the rate of 2 tons per acre, or 2.5 tons per acre for slopes greater than or equal to 4 percent slope, based on slope measurements. Incorporation of straw will not be required. Straw shall be distributed evenly without clumping or piling. When weather conditions are suitable, straw may be pneumatically spread.

C. The following mixture in the rates indicated shall be applied with hydro-seeding equipment:

Material Temporary Pounds
Per Acre (Minimum)
Permanent Pounds
Per Acre (Minimum)
Fiber 500 500
Tackifier 150 150
The ratio of total water to total tackifier in the mixture shall be as recommended by the manufacturer.

Once seed is started in an area, straw and stabilizing emulsion applications shall be completed in that area on the same working day.

The rates of erosion control materials may be changed by the Engineer to meet field conditions.

Erosion control will be measured by the square yard or acre.

APPROVED
Packet Pg. 730 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 30 Full compensation for “Erosion Control” shall be considered as included in the contract lump sum price paid for “Water Pollution Control” and no separate payment will be made therefor.

Local Topsoil
This work includes excavating, stockpiling, removing from stockpiles, spreading, and consolidating topsoil.

Material
Topsoil obtained from sources within the right-of-way shall be excavated to the lines and depths as directed by the Engineer. All lumps or clods shall be broken up before the topsoil is spread.

Topsoil obtained from within the project will be considered as selected material. Imported topsoil must consist of fertile, friable soil of loamy character that contains organic matter in amounts natural to the region and be capable of sustaining healthy plant life. Imported topsoil must be free from deleterious substances such as litter, refuse, toxic waste, stones larger than 1 inch in size, coarse sand, heavy or stiff clay, brush, noxious weeds, and other substances detrimental to plant, animal, and human health.

Construction
Preparation shall include all the work required to make ready the areas for application of topsoil and erosion control materials. Rocks and debris larger than 2-1/2 inches in maximum dimensions shall be removed and disposed of outside the highway right-of-way as permitted by the Engineer.

Topsoil shall be spread uniformly at the rate specified in the special provisions or shown on the plans. The finished surface after spreading topsoil shall be approximately 1 inch below the top of adjacent grade.

Topsoil shall not be placed until all equipment, except equipment required for spreading topsoil, is through working in an area.

Spread topsoil to a uniform thickness. Topsoil shall be placed a minimum of 6 inches thick on all disturbance areas to be seeded and mulched per “Erosion Control” of these special provisions.

Topsoil shall be placed 4 inches thick on cut slopes that are 2:1 and flatter. Cut slopes shall be scarified to a depth of 2 inches prior to placing topsoil to ensure sufficient contact. Topsoil shall be roughened by trackwalking or rolling with a sheepsfoot roller prior to seeding and mulching.

Trackwalk topsoil with tracked equipment run perpendicular to slope contours. Water may be used to assist this process but must not cause erosion. Finished surfaces after topsoil placement must achieve a minimum of 85 percent compaction.

Full compensation for local topsoil shall be considered as included in the contract price paid for “Water Pollution Control” and no additional compensation will be allowed therefor.

Plastic Netting
Photodegradable or biodegradable plastic netting shall not be used in fiber rolls, erosion control blankets, or any other erosion control BMP unless specified or approved by the Engineer.

APPROVED
Packet Pg. 731 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 31 Fiber Rolls
Fiber rolls shall conform to the provisions in Section 3-12.6, “Water Pollution Control,” of the Standard Specifications and these special provisions and shall consist of applying fiber rolls materials to the areas shown on the plans, embankment, and excavation slopes and other areas disturbed by construction activities and as directed by the Engineer.

Fiber rolls shall be premanufactured roll of rice or wheat straw, wood excelsior, or coconut fiber encapsulated within a biodegradable jute, sisal, or coir fiber netting. The netting shall have a minimum durability of one year after installation. The netting shall be secured tightly at each end of the roll. Rolls shall be between 8 inches and 10 inches in diameter and shall have a minimum weight of 1 pound per linear foot and a minimum length of 20 feet.

Wood stakes shall be a minimum of 1” x 1” x 24” in size and made of untreated fir, redwood, cedar, or pine and cut from sound timber. They shall be straight and free of loose or unsound knots and other defects which would render them unfit for the purpose intended. Metal stakes shall not be used.

Fiber rolls shall be installed by constructing a furrow to a depth between 2 inches and 4 inches, and to a sufficient width to hold the fiber roll. The bedding area for the fiber rolls shall be cleared of obstructions including rocks, clods, and debris greater than one inch in diameter before installation. Stakes shall be installed 48 inches apart along the length of the fiber rolls and stopped at 12 inches from each end of the rolls. Stakes shall be driven to a maxium of 2 inches above, or flush with the top of the roll. Fiber rolls shall be placed parallel to the slope contour and 8 feet apart on 2:1 slopes and as shown on the plans.

If the intended function of the fiber rolls to disperse concentrated water runoff and to reduce runoff velocities is impaired, the Contractor shall take action to repair or replace the fiber rolls. Split, torn, or unraveling rolls shall be repaired or replaced. Broken or split stakes shall be replaced.

Sagging or slumping fiber rolls shall be repaired with additional stakes or replaced. Locations where rills and other evidence of concentrated runoff have occurred beneath the rolls shall be corrected. Fiber rolls shall be repaired or replaced within 24 hours of identifying the deficiency.

Fiber rolls will be measured by lineal foot.

Full compensation for “Fiber Rolls” shall be considered as included in the contract lump sum price paid for “Water Pollution Control” and no separate payment will be made therefor.

As-Built/Record Documents
The Contractor shall keep and maintain on the Project Site, one record set of the Contract Documents, which shall be updated weekly to reflect current as-built conditions of the Work as it progresses and document changes to the Work shown on the Project Plans.

Record Documents shall be produced by marking a full-size (22”x34”) copy of the Project Plans.

The Contractor’s as-built information shall be clear and legible, marked in red, and at a minimum identify the following: the exact horizontal and vertical location of all installations in their finished condition, including all underground work and components; all electrical, plumbing and mechanical installations; all changes in construction, materials and installed equipment; and buried or concealed construction and utility features that are revealed during the course of

APPROVED
Packet Pg. 732 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 32 construction. Special attention shall be given to recording of all buried utilities that differ from locations indicated in the Contract Documents.

The updated drawings shall be available for review by the Engineer and Inspector. Failure to comply with the preparation and submission of as-builts may result in the Engineer withholding the current progress payment, or be subject to administrative deductions as per Section 7-3.2.

Where specified in the Special Provisions or Technical Specifications as a condition to certification of final completion, the Contractor shall provide the original Record Documents, together with a certification by the Contractor that the Record Documents are a true representation of the Work as actually constructed. Timely submission of complete Record Documents shall be a condition to certification of final completion and to final payment. Delays in the submission of complete Record Documents may subject the contractor to liquidated damages.

Full compensation for As-Built/Record Documents shall be considered as included in the contract price paid for the various items of work and no additional compensation will be allowed therefor.

Order of Work
The first order of work shall be to place the order for the traffic signal equipment within 15 days after the notice to proceed has been issued. The Contractor shall furnish the Engineer with a statement from the vendors that the orders for the signal equipment have been received and accepted by the vendors.

Work Hours
Attention is directed to Caltrans Encroachment Permit No. 0223-NSN-0345 “Work Hours” abnd “Traffic Control”.

Notification of Work
The Contractor shall notify all affected customers (business or residence) at least 48 hours in advance of the anticipated work in the area. If the customer is not present, a notice approved by the Engineer shall be left attached to the front door (NOT in a mailbox). The Contractor shall prepare and submit its proposed door hanger notice for City review and approval.

Full compensation for notifications shall be included in the cost of the various contract items and no additional compensation will be allowed therefore.

Temporary Pavement Delineation
Attention is directed to Caltrans Encroachment Permit No. 0223-NSN-0345 “Temporary Pavement Delineation”
Full compensation for Temporary Pavement Delineation shall be considered as included in the contract price paid for Traffic Stripe (Thermo plastic 4”, 6”, and 8”) and no further compensation will be allowed therefor.

APPROVED
Packet Pg. 733 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 33 Pavement Marker
Attention is directed to Caltrans Encroachment Permit No. 0223-NSN-0345 “Markers and Delineators”
Full compensation for Temporary Pavement Delineation shall be considered as included in the contract price paid for Traffic Stripe (Thermo plastic 6” and 8”) and no further compensation will be allowed therefor.

Contract Item List
Prepare Water Pollution Control
Attention is directed to Special Requirements for “Erosion Control” and Section 3-12.6, “Water Pollution Control,” of the special provisions.

Water Pollution Control
Attention is directed to Special Requirements for “Erosion Control” and Section 3-12.6, “Water Pollution Control,” of the special provisions.

Traffic Control
Attention is directed to Caltrans Encroachment Permit No. 0223-NSN-0345 “Traffic Control”.

Attention is directed to Part 6, “Temporary Traffic Control,” of the Standard Specifications and these special provisions.

Project Funding Sign
Attention is directed to the Special Requirements for “Project Funding Sign” of the Miscellaneous Requirements of the special provisions.

Construction Area Signs
Attention is directed to the Special Requirements for “Construction Area Signs” of the Miscellaneous Requirements of the special provisions.

Excavation (Unclassified)
Attention is directed to Section 300-2 “Unclassified Excavation” of the Special Provisions and Section 300-2.9 “Payment” of the Standard Specifications.

Cold Mill Asphalt Concrete
Attention is directed to Section 404 “Cold Milling” of the Standard Specifications and the Special Provisions.

APPROVED
Packet Pg. 734 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 34 Microsurface (Type II)
Microsurface (Type II) shall consist of mixing a polymer modified, cationic microsurfacing emulsion (MS), aggregate, mineral filler, set-control additives, and water; as well as spreading the mixture on a pavement surface where shown on the plans, in conformance with these special provisions, and as directed by the Engineer. Microsurfacing is to be a quick-traffic system, meaning that it will be able to accept traffic after a short period. Normally, these systems have been required to accept rolling traffic on a one-half (½) inch thick surface within one hour after placement in +75o F temperature and 50 percent or less humidity.

Materials
The material for microsurfacing shall conform to the following requirements:

Microsurfacing Emulsion (MS)
Microsurfacing Emulsion (MS) shall be homogenous and shall conform to these special provisions. The polymer shall be milled or blended into the asphalt or blended into the emulsifier solution prior to the emulsification process.

The MS shall conform to the following requirements when tested in conformance with the following test methods:

Polymer Modified, Cationic Microsurfacing Emulsion (MS) Specification Designation Test Method Requirement
Viscosity SDF @ 77 °F AASHTO T 59 15-90 Seconds
Sieve, max. AASHTO T 59 0.30 Percent
Settlement, 5 days, max. ASTM D244 5 Percent
Storage Stability, 1 day,
max.

AASHTO T 59 1 Percent
Residue by Evaporation,
min.

California Test 331 62 Percent
Specification Designation for Residue
Specification Designation Test Method Requirement
Penetration@ 77 F
100g, 5s ,0.1mm
AASHTO T 51 40-90
Softening Point F Min. AASHTO T53 135
Water and Additives
Water shall be potable and free of harmful soluble salts, reactive chemicals, and other contaminants. Additives may be added to the emulsion mix or any of the component materials to provide the control of the quick-traffic properties. The additives must be included as part of the mix design and be compatible with other components of the mix.

APPROVED
Packet Pg. 735 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 35 Mineral Filler
Mineral filler shall be Portland cement or hydrated lime that is free of lumps. Portland cement shall be either Type I, Type II, Type III or combination thereof. The type and amount of mineral filler shall be determined by the Contractor based on laboratory mix designs. The mineral filler will be considered part of the aggregate gradation requirement. An increase or decrease of 1 percent may be permitted when the Micro surfacing is being placed if it is found to be necessary for better consistency or set times.

Aggregate
The mineral aggregate used shall be of the type and grade specified for the particular use of the micro surfacing. Aggregate shall consist of sound, durable, crushed stone or crushed gravel and approved mineral filler. The material shall be free from vegetable matter and other deleterious substances. Aggregates shall be 100% crushed material with no rounded particles and shall be volcanic in origin. All aggregate shall be free of caked lumps and oversize particles.

The aggregate, prior to the addition of emulsion shall conform to the requirements of this section. If aggregates are blended each component aggregate shall meet the sand equivalency and abrasion resistance and shall be 100% crushed as tested in accordance with California Test 205. The definition of a crushed particle in California Test 205 Section D, is amended to read: “Any particle having two or more fresh mechanically fractured faces shall be considered a crushed particle.”
The percentage composition by mass of the aggregate (including mineral filler) shall conform to the following grading requirements when tested in conformance with California Test 202:

TYPE II
Sieve Sizes Percentage Passing
3/8" 100
No. 4 94-100
No. 8 65-90
No. 16 40-70
No. 30 25-50
No. 50 20-30
No. 100 10-20
No. 200 5-15
The aggregate (excluding mineral filler) shall conform to the following quality requirements:

Test California Test Requirements
Sand Equivalent (Min.) 217 70
Durability Index (Min.) 229 75

APPROVED
Packet Pg. 736 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 36 Percentage of Crushed
particles (Min.)1 205 100%
Los Angeles Rattler
Loss at 500 Rev. (Max) 211 35%
Notes: 1. CT205, Section D, is amended to read: “Any particle having 2 or more freshly, mechanically fractured faces shall be considered a crushed particle.” If the results of the aggregate grading do not meet the specified gradation, the micro surfacing represented by the test shall be removed. Also, if the results of the Sand Equivalent test for aggregate do not meet the specified requirement, the micro surfacing represented by the test shall be removed. No single aggregate grading or Sand Equivalent test shall represent more than 300 ton or one day's production, whichever is smaller.

Mix Design
At least seven working days before the microsurfacing placement commences, the Contractor shall submit for approval of the Engineer a laboratory report of tests and a proposed mix design covering the specific materials proposed for use on the project.

The percentages of each individual material proposed in the mix design shall be shown in the laboratory report. Individual materials shall be within the following limits:

Residual Asphalt............ 5.5% to 9.5% by dry mass of aggregate Mineral Filler .................. 0% to 3% by dry mass of aggregate Additive.......................... As needed
Water ............................ As needed
Adjustments may be required during construction based on field conditions.

The mix design and aggregate tests shall be performed by a laboratory capable of performing the applicable International Slurry Surfacing Association (ISSA) tests. The proposed microsurfacing mixture shall conform to the specified requirements when tested in conformance with the following tests:

Test ISSA Test Method Requirements
Wet Cohesion
@ 30 Minute (Set) (Min.)
@ 60 Minute (Traffic) (Min.)
TB* 139
12 kg-cm
20 kg-cm
Excess Asphalt TB* 109 540 g/m2
Wet Stripping (Min.) TB* 114 90%
Wet Track Abrasion
6-day Soak Loss (Max.)
TB* 100
810 g/m2
Displacement
Lateral (Max.)
Specific Gravity After 1000
Cycles of 125 lbs. (56.8 kg)(Max.)
TB* 147A
5%

2.10 Classification Compatibility TB* 144 (AAA, BAA) 11 Grade Points

APPROVED
Packet Pg. 737 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 37 Mix Time @ 77°F (25°C) TB* 113 Controllable to 120
Seconds
TB* = Technical Bulletin
The laboratory that performed the tests and designed the mixture shall sign the laboratory report.

The report shall show the results of the tests on individual materials and shall compare their values to those required by these special provisions. The report shall clearly show the proportions of aggregate, filler (minimum and maximum), water (minimum and maximum), set control additive, and MSE solids content (minimum and maximum) based on the dry mass of aggregate. The laboratory shall report the quantitative effects of moisture content on the unit mass of the aggregate (bulking effect) in conformance with the requirements of ASTM Designation C 29M.

Previous laboratory reports covering the same materials may be accepted provided the material test reports were completed within the previous 12 months.

Once the mix design is approved by the Engineer, no substitution of other material will be permitted unless the materials proposed for substitution are first tested and a laboratory report is submitted for the substituted design in conformance with these special provisions. Substituted materials shall not be used until the mix design for those materials has been approved by the Engineer.

The completed mixture, after addition of water and set control agent, if used, shall be such that the micro surfacing mixture has proper workability. At the expiration of the road closure hours, in conformance with the provisions in Part 6 - Street Closures, Detours, Barricades, of these special provisions, the microsurfacing mixture shall be sufficiently cured to support unrestricted traffic.

Proportioning
Aggregate, mineral filler, MS, water, and additives, including the set-control agent, if used, shall be proportioned by volume utilizing the mix design approved by the Engineer. If more than one kind of aggregate is used, the correct amount of each kind of aggregate to produce the required grading shall be proportioned separately, prior to adding the other materials of the mixture, in a manner that will result in a uniform and homogeneous blend.

The aggregate shall be proportioned using a belt feeder operated with an adjustable cutoff gate.

The height of the gate opening shall be determinable. The MS shall be proportioned by a positive displacement pump. Variable rate emulsion pumps, if used, shall be calibrated and sealed in the pump's calibrated condition in conformance with California Test 109 prior to usage.

The delivery rate of aggregate and MS per revolution of the aggregate feeder shall be calibrated at the appropriate gate settings for each mixer-spreader truck used on the project in conformance with California Test 109 and in conformance with the provisions of these special provisions.

The aggregate belt feeder shall deliver aggregate to the pugmill with such volumetric consistency that the deviation for any individual aggregate delivery rate check-run shall not exceed 2.0 percent of the mathematical average of 3 runs of at least three tons each. The emulsion pump shall deliver MS to the pugmill with such volumetric consistency that the deviation for any individual delivery rate check-run shall be within 2.0 percent of the mathematical average of 3 runs of at least 300 gallons each. The water pump shall deliver water to the pugmill with such volumetric consistency that the deviation for any individual delivery rate check-run shall be within 2.0 percent of the mathematical average of 3 runs of at least 300 gallons each.

APPROVED
Packet Pg. 738 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 38 The MS storage tank shall be located immediately before the emulsion pump and shall be equipped with a device which will automatically shut down the power to the emulsion pump and aggregate belt feeder when the MS level is lowered to a point where the pump suction line is exposed.

A temperature-indicating device shall be installed in the emulsion storage tank at the pump suction level. The device shall indicate the temperature of the MS and shall be accurate to within 10°F.

The belt delivering the aggregate to the pugmill shall be equipped with a device to monitor the depth of aggregate being delivered to the pugmill. The device for monitoring the depth of aggregate shall automatically shut down the power to the aggregate belt feeder whenever the depth of aggregate is less than the target depth of flow. A second device shall be located where the device will monitor the movement of the aggregate belt by detecting revolutions of the belt feeder. The devices for monitoring no flow or belt movement shall automatically shut down the power to the aggregate belt when the aggregate belt movement is interrupted. The device to detect revolutions of the belt feeder will not be required where the aggregate delivery belt is an integral part of the drive chain. To avoid erroneous shutdown by normal fluctuation, a delay of 3 seconds will be permitted between sensing and shutdown of the operation.

Mixing and Spreading Equipment
The micro surfacing shall be mixed in continuous pugmill mixers of adequate size and power for the type of micro surfacing to be placed. All indicators shall be in conformance with these special provisions and shall be in working order prior to commencing mixing and spreading operations.

Mixer-spreader trucks shall be equipped to proportion the MS, water, aggregate, mineral filler, and set-control additives by volume. Rotating and reciprocating equipment on mixer-spreader trucks shall be covered with metal guards.

The mixer-spreader truck shall not be operated unless low-flow and no-flow devices and revolution counters are in good working condition and functioning and metal guards are in place.

Indicators required by these special provisions shall be visible while walking alongside the mixerspreader truck.

Aggregate feeders shall be connected directly to the drive on the emulsion pump. The drive shaft of the aggregate feeder shall be equipped with a revolution counter reading to the nearest onetenth of a revolution.

The microsurfacing mixture shall be spread by means of a spreader box conforming to the following requirements:

Spreader Box
The spreader box shall be capable of placing the microsurfacing a minimum of 12-feet wide and shall have strips of flexible rubber belting or similar material on each side of the spreader box and in contact with the pavement to prevent the loss of micro-surfacing from the box.

Spreader boxes shall have baffles, reversible motor driven augers, or other suitable means to insure uniform application on super-elevated sections and shoulder slopes. Spreader box skids shall be maintained in such manner as to prevent chatter (wash boarding) in the finished mat. The spreader box in use shall be clean and free of micro surfacing and MS at the start of each work shift.

APPROVED
Packet Pg. 739 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 39 The spreader box shall have a series of strike-off devices at the rear of the box. The leading strike-off device shall be fabricated of steel, stiff rubber or other suitable material. The number of strike-off devices shall be determined by the Contractor. The first strike-off device shall be designed to maintain close contact with the pavement during the spreading operations, shall obtain the thickness required, and shall be capable of being adjusted to the various pavement cross sections for application of a uniform micro surfacing finished surface. The final strikeoff device shall be fabricated of flexible material suitable for the intended use and shall be designed and operated to ensure a uniform texture is achieved in the finished surface of the micro surfacing. The final strike-off device shall be cleaned or changed daily if problems with longitudinal scouring occur.

Flexible fabric drags attached to the rear of the spreader box shall not be used.

The microsurfacing mixture, to be spread in areas inaccessible to the controlled spreader box, may be spread by other methods upon approval of the Engineer.

Preparation for Microsurfacing
Before placing the microsurfacing, all pavement surfaces shall be cleaned by pick-up broom to remove loose particles of paving, dirt, and other extraneous material. Manholes, valve boxes, drop inlets and other service entrances shall be protected from the microsurfacing by a suitable method acceptable to the Engineer. When required, the roadway surface may be fogged with water ahead of the spreader box. The application of the fog spray may be adjusted to suit temperatures, surface texture, humidity and dryness of pavement.

All weeds shall be removed prior to application of microsurface.

Placing
The microsurfacing mixture shall be uniformly spread on the existing surfacing within the rate specified without spotting, rehandling or otherwise shifting of the mixture.

The microsurfacing shall not be placed prior to seven days after replacing AC surfacing unless the fresh AC surface area is covered with a prime coat as specified in Section 302-5.3 of these special provisions. In no case shall the micro surfacing be placed on fresh asphalt prior to three days curing time.

The microsurfacing mixture shall not be placed when the ambient temperature is below 60- degrees F, humidity above 60 percent or during unsuitable weather. Microsurfacing shall not be placed if rain is imminent or there is the possibility that there will be freezing temperatures within 24 hours.

Microsurfacing shall be spread at a rate within the following ranges of pound of dry aggregate per square yard (kilograms of dry aggregate per square meter).

Micro-surfacing Type Location Spread Rate
Type II Full Traffic Width 15 – 20

APPROVED
Packet Pg. 740 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 40 Longitudinal joints shall correspond with the edges of the traffic lanes. The Engineer may permit other patterns of longitudinal joints if the patterns will not adversely affect the quality of the finished product.

Through traffic lanes shall be spread in full lane widths only. Longitudinal joints common to two traffic lanes shall be butt joints with overlaps not to exceed 3 inches. Building paper shall be placed at the transverse joints to avoid double placement of the micro surfacing. Other suitable methods to avoid double placement of the micro surfacing will be allowed. Hand tools shall be available to remove spillage.

The mixture shall be uniform and homogeneous after placing on the surfacing and shall not show separation of the MS and aggregate after setting. The completed surface shall be of uniform texture and free from ruts, humps, depressions, or irregularities.

Adequate means shall be provided to protect the microsurfacing from damage by traffic until such time that the mixture has cured sufficiently so that the micro surfacing will not adhere to or be picked up by the tires of vehicles.

Placement of the microsurfacing shall cease a minimum of one hour before the expiration of the road closure hours as specified in Part 6 - Street Closures, Detours, Barricades, of these special provisions, unless the Contractor proves to the satisfaction of the Engineer that the surface will be ready for unrestricted traffic at the expiration of the road closure hours.

Broadcast Sand
Sand may be used to open limited traffic to driveways only with the Engineer’s authorization.

Sand shall be “washed” sand and applied only by using a mechanical broadcaster. All broadcast sand shall be swept up within 24 hours of application.

Repair of Early Distress
If bleeding, raveling, delamination, rutting, or washboarding occurs within the one-year maintenance period, the Contractor shall diligently pursue repairs within 15 days of notification by any method approved by the Engineer. The Contractor shall not be relieved from maintenance until repairs have been completed.

Payment
The contract price paid per square yard for “Microsurfacing (Type II)” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in placing microsurfacing, complete in place, including testing for and furnishing mix design, cleaning the surface, furnishing added water and set-control additives, rolling, sanding, and protecting the micro surfacing until it has set, as shown on the plans, as specified in these special provisions, and as directed by the Engineer.

Asphalt Concrete
Attention is directed to Section 302-5 “Asphalt Concrete Pavement” of the Special Provisions and Standard Specifications.

APPROVED
Packet Pg. 741 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 41 Aggregate Base
Attention is directed to Section 301-2 “Untreated Base” of the Standard Specifications and the Special Provisions.

Cross Gutter
The contract price paid per square foot for “Cross Gutter” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in the installation of the concrete cross gutter, complete in place, including removal and disposal of the existing asphalt concrete shown on the plans, removal of any existing pipe, placement of concrete or asphalt transitions, tie-in paving, etc. as necessary to provide a complete and fully functioning cross gutter as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.

Curb and Gutter
The contract unit price paid per linear foot for “Curb and Gutter” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in the installation of the curb and gutter including but not limited to sawcutting for trim line, removal and disposal of the existing asphalt concrete and existing curb and gutter, additional aggregate base needed to make base grade, AC tie-in paving, protection of the existing sidewalk, trees, etc. as necessary to provide a complete and fully functioning curb and gutter as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.

Concrete Curb Ramp
Ramp types shall be as noted on the plans unless otherwise approved by the Engineer and shall be constructed per City of Redding Construction Standards Pages 141.10, 141.20, and 141.30, per Caltrans Standard A88A, or as shown on the plans.

The contract price paid per square foot of “Concrete Curb Ramp” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in installing concrete curb ramps, complete in place, including grading, excavation, , removal and disposal of the existing asphalt and concrete, base, compaction of base, forming, finishing, curing, installing detectable warning surfaces, installing expansion joint material, grooving, retaining curb, pedestrian accommodations, and public safety as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the engineer.

Sidewalk (4” PCC)
The contract price paid per square foot for "Sidewalk (4" PCC)" shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in the construction of Sidewalk (4" PCC), complete in place, including all watering, trenching, excavation, grading, relocation of irrigation systems as required, root pruning and removal of offensive tree roots, aggregate base backfill, compacting, bar reinforcing steel, integral curbs, concrete forming and curing, tree planters disposal of excess materials,

APPROVED
Packet Pg. 742 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 42 pedestrian accommodation, public safety, and all specific items shown on the plans, specified in the Standard Specifications and these special provisions, and as directed by the Engineer.

Replace Manhole Frame and Cover (SD)
The Contractor shall replace storm drain manhole frame and covers as shown on the plans and per City of Redding Construction Standards page 264.00 and 264.10.

The contract unit price paid for “Replace Manhole Frame and Cover (SD)” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in replacing manhole frame and cover complete in place as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.

Replace Manhole Frame and Cover (SS)
The Contractor shall replace sanitary sewer manhole frame and covers as shown on the plans and per City of Redding Construction Standards page 364.20 and 364.30.

The contract unit price paid for “Replace Manhole Frame and Cover (SS)” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in replacing manhole frame and cover complete in place as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.

Remove Pavement Marking (Thermoplastic)
All thermoplastic pavement marking shall be removed prior to asphalt concrete or micro surfacing application by grinding. Depth of grind shall be slightly less than the thickness of the marking and the resulting surface shall be left rough for proper asphalt concrete or micro-surfacing adhesion.

The contract price paid per square foot of “Remove Pavement Marking (Thermoplastic)” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in removing pavement marking including traffic control, clean up, air pollution control, and mobilization, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.

Remove Traffic Stripe (Thermoplastic)
Traffic stripes measuring 4-inch, 6-inch, and 8-inch wide and pavement markers to be removed shall be removed at the locations shown on the plans and at the locations designated by the Engineer.

Traffic stripes shall be removed to the fullest extent possible from the pavement by any method that does not materially damage the surface or texture of the pavement or surfacing. Sand or other material deposited on the pavement as a result of removing traffic stripes shall be removed as the work progresses. Accumulations of sand or other material which might interfere with drainage or might constitute a hazard to traffic will not be permitted.

Traffic stripes shall be removed before any change is made in the traffic pattern.

APPROVED
Packet Pg. 743 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 43 Remove traffic stripe measuring 4-inch, 6-inch, and 8-inch wide will be measured by the linear foot. Gaps in the broken traffic stripes will not be measured. All paint which is evident in these gaps shall be removed to the fullest extent possible.

The contract price paid per linear foot for “Remove Traffic Stripe (Thermoplastic)” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in removing traffic stripes, complete in place, to include removal of pavement markers including underlying adhesive, provide temporary pavement delineation, disposal of excess materials, as shown on the plans, specified in the Standard Specifications and these special provisions, and as directed by the Engineer.

Pavement Marking (Thermoplastic)
Attention is directed to Section 314-4 Application of Traffic Striping and Curb and Pavement Markings of the special provisions and the Standards Specifications.

Pavement Marking (Green - Bike)
Attention is directed to Section 314-4 Application of Traffic Striping and Curb and Pavement Markings of the special provisions and the Standards Specifications.

Install 90 mil preformed, fused thermoplastic film high skid, that has intermixed reflective elements with factory installed crushed class or aggregate on the surface in the locations shown on the plans. The pavement marking material shall be designed to minimize loss of traction for bicyclists.

The pattern of the green colored marking shall be continuous or segmented in a manner that matches the pattern of the associated dashed lines, thus filling in only the areas that are directly between a pair of dashed lines segments, as shown on the plans.

Pavement Marking (Green - Bike) shall be Ennis-Flint PreMark with Vizigrip or approved equal.

The daytime chromaticity for the green colored marking shall be:
1 2 3 4

X Y X Y X Y X Y

0.230 0.754 0.266 0.500 0.367 0.500 0.444 0.555
The daytime luminance factor (Y) shall be at least 7, but no more than 35.

The nighttime chromaticity for the green colored marking shall be:
1 2 3 4
X Y X Y X Y X y

0.230 0.754 0.336 0.540 0.450 0.500 0.479 0.520

APPROVED
Packet Pg. 744 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 44 Traffic Stripe (4” Thermoplastic), (6" Thermoplastic), (8" Thermoplastic) Attention is directed to Section 314-4 Application of Traffic Striping and Curb and Pavement Markings, of the special provisions and the Standard Specifications.

Pavement Marker
The Contractor shall provide and install Pavement Markers in accordance with Caltrans Standard Plans Details A20A thru and A20D and City of Redding Construction Standards 171.00 and as specified in these special provisions, and as directed by the Engineer.

Pavement markers outside the project limits marred or destroyed by the Contractor’s operations shall be replaced to the satisfaction of the Engineer at no cost to the City of Redding.

The contract unit price paid for “Pavement Marker” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in installing pavement markers, complete in place, as shown on these plans, as specified in these special provisions, and as directed by the Engineer.

Install Sign
The distance from the finish grade to the bottom edge of the lowest sign shall be 7 feet where located in pedestrian walkways.

The contract unit price paid for each “Install Sign” shall include full compensation for furnishing all labor, materials, tools, equipment , and incidentals and for doing all the work involved in installing signs complete in place, including all required mounting hardware, sign post and quick-change base per the City of Redding Standards Page 152.10, excavation, concrete, and providing temporary signage during the transition as shown on the plans, as specified in the Standard Specifications, these special provisions, and as directed by the Engineer.

Remove Sign
The contract unit price paid for “Remove Sign” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in removing and disposing of existing signs and posts, including all work necessary to backfill the existing post hole, as shown on the plans, as specified in the Standard Specifications, these special provisions, and as directed by the Engineer.

Marker Post
Marker Posts shall be Type K17 Flexible Post by US Reflector or approved equal. The posts shall be white in color with two, white reflective collars. Posts shall be installed with an anchor bolt that screws into a flush mounted metal sleeve, which is bonded into the pavement. The Contractor shall mark the post locations for approval by the Engineer prior to installation.

Marker Post with cycle track sign shall be FlexBollard with Sign Post of Seton or approved equal.

The posts shall be red in color with two, white reflective stripes. Posts shall be installed with an anchor bolt that screws into a flush mounted metal sleeve, which is bonded to the pavement. The Contractor shall mark the post locations for approval by the Engineer prior to installation.

APPROVED
Packet Pg. 745 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 45 The contract unit price paid for “Marker Post” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in installing marker posts complete in place including all required mounting hardware as shown on the plans, as specified in the Standard Specifications, and these special provisions, and as directed by the Engineer.

Traffic Signal Modifications
Attention is directed to Part 7, Section 700 Materials of these Special Provisions.

Street Light (Standard & LED Luminaire)
The contract unit price paid for “Street Light (Standard & LED Luminaire)" shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in installing the street lights, including foundation standard and luminaire, as set forth on the project plans, complete in place, including all watering, trenching, excavation, aggregate base backfill, concrete forming and curing, disposal of excess materials, trimming of existing trees that will block lighting, all necessary to provide a complete and fully functioning street light as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.

Pullbox (2E), (3E)
Attention is directed to section 701-11 of the Standard Specifications.

Conduit (2" PVC), (4” PVC)
Attention is directed to section 701 of the Standard Specifications and these special provisions.

Conductor (#6)
Attention is directed to section 701 of the Standard Specifications and these special provisions.

APPROVED
Packet Pg. 746 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 46 Electric Plans
The project electric plans (sheets 22-26) refer to work to be completed by the "Customer". On this project, the Customer is the City of Redding Public Works Department. All work set forth in the electric plans as being completed by Customer shall be completed by the Contractor as necessary to provide a complete and operational street light system as set forth in the plans, as specified in the Standard Specifications, the City of Redding Construction Standards, these special provisions, and as directed by the Engineer.

Full compensation for interpreting the electric plans and providing the required electric improvements shall be considered as included in the contract price paid for various items of work and no further compensation will be allowed therefor.

APPROVED
Packet Pg. 747 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 47 PART 1 GENERAL PROVISIONS
SECTION 1 GENERAL
1-1 General
The following terms are added:
“Wherever in these documents the words “City” or “Agency” appear, it shall be understood to refer to and indicate the City of Redding, a general law city, existing under and by virtue of the laws of the State of California.

Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended or if delivered at or sent by registered mail to the last business address known to him who gives the notice.”
1-2 Terms and Definitions
Definitions are amended or added as follows:

1. Bid Guaranty – The cash, cashier’s check, certified check, or bidder’s bond accompanying the Bid as a guaranty that the Bidder will enter into a contract with the Agency for the performance of the work.

2. Board, Council, and Agency – The officer or body constituting the awarding authority of the Agency.

3. City, Contractor, and Engineer - The City, Contractor, and Engineer are those as defined in the Standard Specifications. They are treated throughout the contract document as if each were of the singular number and masculine gender.

4. Date of Execution of the Contract – The date on which the Contract is signed by the Agency’s authorized representative.

5. Plans – The drawings, profiles, cross sections, working drawings and supplemental drawings, or reproductions thereof, approved by the Engineer, which show the location, character, dimensions, or details of the Work. Plans may either be bound in the same book as the Specifications or bound in separate sets, and are part of the Contract Documents regardless of the method of binding.

6. Standard Specifications – Standard Specifications for Public Works Construction (SSPWC) the “Greenbook,” 2021 Edition and current supplements as amended, prepared by the Southern California Chapter American Public Works Association, and the Southern California Districts, Associated General Contractors of California.

APPROVED
Packet Pg. 748 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 48 1-6 BIDDING AND SUBMISSION OF THE BID
1-6.1 General
Add the following paragraph:
“When an item of work is designated as (S) in the Bid or Proposal, the estimated quantity for that item of work shall be designated as a “Specialty Item.” 1-7 AWARD AND EXECUTION OF THE CONTRACT
1-7.1.1 Acceptance or Rejection of Proposals
The City reserves the right to reject any and all proposals. Without limiting the generality of the foregoing, any proposal which is incomplete, illegible, or irregular may be rejected; any proposal having erasures or corrections in the price sheet may be rejected; any proposal in which the unit price is omitted or in which the unit price is obviously unbalanced may be rejected; any proposal accompanied by an insufficient or irregular bid security may be rejected. 1-7.1.2Forfeiture of Proposal Guaranty
If a bidder should, after being awarded the contract, fail to execute the contract and furnish the necessary bonds, certifications, and insurance in the manner and within the time provided in these specifications, the bid security shall be forfeited to the City as liquidated damages, and the award of the contract shall be annulled.
1-7.1.3 Return of Proposal Guaranties
All securities will be returned except that of the successful bidder and that of the next lowest bidders up to four (4), which the City will hold until the contract documents have been executed and the required contract bonds and insurance have been submitted by the successful bidders and accepted by the City or until bids are rejected.
1-7.1.4 Award of Contract
Any contract awarded will be to the lowest responsible bidder who submits a responsive bid. Any award will be made within 90 days after the opening of the proposals. The period of time specified above within which the award of contract may be made shall be subject to extension. All bidders who submitted a bid that was not rejected will be asked to extend their bids.

All bids will be compared on the basis of the Engineer’s estimate of the quantites of work to be done.

1.7.1.5 Execution of Contract
The contract in form and content satisfactory to the City shall be executed by the bidder to whom the contract is awarded and returned, together with all required bonds, policies, and certificates, within 10 days, (not including Sundays and legal holidays), after award of the contract. No proposals shall be considered binding on the City until the contract has been executed by all parties thereto.

APPROVED
Packet Pg. 749 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 49 1-7.1.6Early Start of Work
The Contractor may start job site activities before receiving notice of Contract approval under the following conditions;

1. Submit the contract, bonds, and insurance listed in 1-7.1.5, Execution of Contract.

2. Provide a letter to the City with at least 72-hour notice requesting an early start of work.

3. Request and obtain an encroachment permit from the City.

4. Receive written approval from the City Engineer to start work.

5. Perform work at your own risk.

6. If the Contract is approved, work already performed that complies with the Contract is authorized.

7. If the Contract is not approved, the Contractor shall leave the job site in a neat condition, restore the site or facility to its former condition or equal. The City will not pay for this work.

8. The City does not adjust working days for work performed before Contract approval.

9. Ground disturbing/job site activities are still subject to the requirements of the Water Pollution Control Plan or Storm Water Pollution Prevention Plan. 1-7.2 Contract Bonds
Delete this section in its entirety and add the following:
“Before execution of the Contract by the Agency, the Bidder shall file with the Agency surety bonds satisfactory to the Agency in the amounts and for the purposes noted below. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California shall be issued by a surety who is listed in the latest revision of the U.S.

Department of Treasury Circular 570, is authorized to issue bonds in California, and whose bonding limitation shown in said circular is sufficient to provide bonds in the amount required by the Contract. The Bidder shall pay all bond premiums, costs, and incidentals.

Each bond shall incorporate, by reference, the Contract and be signed by both the Bidder and Surety and the signature of the authorized agent of the surety shall be notarized.

The Bidder shall provide two good and sufficient surety bonds. The “Payment Bond” (Material and Labor Bond) shall be for not less than 100 percent of the contract price, to satisfy claims of material suppliers and of mechanics and laborers employed by it on the work. The bond shall be maintained by the Contractor in full force and effect until the Work is accepted by the Agency, and until all claims for materials and labor are paid, and shall otherwise comply with the Civil Code.

The “Performance Bond” shall be for 100 percent of the contract price to guarantee faithful performance of all work, within the time prescribed, in a manner satisfactory to the Agency, and that all materials and workmanship will be free from original or developed defects. In

APPROVED
Packet Pg. 750 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 50 addition, the Performance Bond shall include a one-year Maintenance Bond which shall begin upon acceptance of the Work. The amount of the Maintenance Bond shall be for 50 percent of the final contract price. The Maintenance Bond shall be submitted on the form contained in these specifications or on a form which conforms to it prior to release of final payment (less retention) for the work.

Should any bond become insufficient, the Contractor shall renew the bond within ten (10) days after receiving notice from the Agency.

Should any Surety at any time be unsatisfactory to the Agency, notice will be given the Contractor to that effect. No further payments shall be deemed due or will be made under the Contract until a new Surety shall qualify and be accepted by the Agency.

Changes in the Work, or extensions of time, made pursuant to the contract, shall in no way release the Contractor or Surety from their obligations. Notice of such changes or extensions shall be waived by the Surety.”
SECTION 2 SCOPE OF WORK
2-2 PERMITS
Add the following paragraph(s):
“The Contractor and any subcontractor working under the Contractor shall obtain a City business license prior to doing any work on a job site in the City. It shall be the responsibility of the Contractor, who is signature to the Contract, to notify their subcontractor(s) to abide to this requirement. In the event a required business license is not obtained, the City shall give the Contractor written notice of 10 days to correct the deficiency. In the event the business license(s) is not obtained, the City shall withhold the estimated cost of the license(s) from the next payment to the Contractor until the license is obtained. If during the course of construction a City business license expires and the Contractor or subcontractor continues to work, these same provisions will apply.”
The City of Redding has obtained an encroachment permit (No.0223-NSN-0345) from Caltrans. The Contractor shall be responsible for obtaining a double encroachment permit from Caltrans at a cost of $164. The Contractor shall also be responsible for meeting with Caltrans staff to go over all the requirements prior to start of construction. The Contractor shall familiarize himself with the permit requirements and shall be responsible for the implementation of all permit conditions.

Environmental Compliance
The Contractor’s activities on this project are subject to certain environmental compliance limitations. The City has obtained or adopted permits, agreements, approvals, and/or other environmental documentation (Permits) for the project that are binding on the Contractor and affect the Contractor’s work. Such Permits include:

1. The project includes pre-construction biological survey areas. If vegetation removal or construction occurs during the nesting season for migratory birds or raptors (February 1 and August 31), the Contractor will hire a qualified biologist to conduct pre-construction surveys for nesting birds.

APPROVED
Packet Pg. 751 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 51 The Contractor shall be fully aware of the Permits and shall be responsible for constructing the project in compliance with all provisions of the Permits, and those applicable measures contained in the Permits reasonably pertaining to construction of the project as indicated below in ENVIRONMENTAL COMPLIANCE. Proposed changes to the Permits shall be submitted to the Engineer for transmittal to the appropriate approving authority. Changes shall not be implemented until approved in writing by the Engineer. All changes shall be fully binding on the Contractor.

Contractor shall be responsible for penalties assessed or levied on the Contractor or the City of Redding as a result of the Contractor’s failure to comply with applicable provisions and measures of the Permits.

Modifications made as a result of the Contractor’s non-compliance with the conditions of the Permits shall not be cause for additional compensation to the Contractor. The provisions of this section shall be made a part of every subcontract executed pursuant to this contract.

Days when the Contractor’s operations are restricted by the requirements of this section shall not be considered to be non-working days. No time extensions shall be granted as a result of the restrictions of this section.

Contract Environmental Manager
The Contractor shall designate a Contractor Environmental Manager (CEM) to coordinate, manage, and ensure implementation of all environmental related measures as required by environmental permits and these Specifications. The CEM will be located at the project site and available for coordination with the City as necessary to ensure compliance with these Specifications. The CEM shall monitor the Contractor’s activities and have the authority to implement or cause implementation of measures necessary to ensure compliance with these Specifications. The CEM may be assigned other duties and responsibilities by the Contractor as desired.

Environmental Compliance

1. The construction related conditions in the Permits and Agreements shall be implemented by the Contractor including pre-construction notifications, meetings, trainings, surveys, ESA fence installation, or post-construction notifications and reporting.

2. If vegetation removal or construction activities will occur between February 1 and August 31, a Contractor supplied Biologist shall conduct a preconstruction survey within 7 days of construction activities beginning (including mobilization). If construction activities cease for a period greater than 7 days, additional preconstruction surveys will be required.

3. If nesting birds or raptors are found, the Biologist and Contractor must contact the City Resident Engineer and the City Environmental Compliance Manager. The City will consult with CDFW. An appropriate buffer, as determined by CDFW will be placed around the nest until the young have fledged.

4. Resource agency representatives shall have the right to enter the Project site at any time.

5. If human remains are discovered during project activities, all work will stop in the vicinity of the find and both the City and the Shasta County Coroner’s Office shall be notified.

APPROVED
Packet Pg. 752 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 52 Treatment of the remains shall be conducted in accordance with the direction of the Coroner and/or the Native American Heritage Commission, as appropriate.

6. Staging and storage areas for equipment, materials, fuels, lubricants and solvents along with all maintenance and re-fueling activities for all machinery and equipment shall be no less than fifty (50) feet away from any watercourse (drainage, ditch, creek, stream, or river).

7. Any equipment or vehicles driven and/or operated within or adjacent to a watercourse shall be checked and maintained daily to prevent leaks or materials that could be deleterious to aquatic and terrestrial life or riparian habitat.

8. Stationary equipment such as motors, pumps, generators, and welders, located within or adjacent to a watercourse shall be positioned over drip pans.

9. All activities performed in or near a watercourse shall have absorbent materials designated for spill containment and clean-up activities on-site for use in an accidental spill. The Contractor shall immediately notify the Engineer and the California Emergency Management Agency at 1-800-852-7550 and immediately initiate the clean-up activities.

CDFW shall be notified by the Contractor and consulted regarding clean-up procedures.

10. The Contractor shall prevent the discharge of sediment, and/or muddy, turbid, or silt-laden waters, resulting from the project, into any watercourse. Where necessary to prevent such discharge, the Contractor shall properly install and maintain sediment barriers (including but not limited to filter fabric fencing, fiber mats, rice straw or fiber waffles or rolls) capable of preventing downstream sedimentation/turbidity. Said devices shall be cleaned of all trapped sediment as necessary to maintain proper function. Recovered sediment shall be disposed of where it shall not return to the watercourse. Said devices shall be completely removed from the channel, along with all temporary fills, upon completion of operations.

11. Best management practices (BMPs) for erosion, sediment, turbidity and pollutant control shall be implemented and in place at commencement of, during, and after any ground clearing activities, construction activities, or any other project activities that could result in erosion, sediment, or other pollutant discharges to waters. An effective combination of erosion and sediment control BMPs shall be implemented year round, regardless of season or time of year.

12. Groundwater and subsurface flow encountered during excavation shall be pumped to a natural or excavated settling basin on stable soil. The settling basin shall not be allowed to drain to or be pumped to any watercourse until the stored water is less turbid than the stream flow into which it is released.

13. Exposed soils and materials stockpiles that are exposed by project operations shall be adequately stabilized when there is a 50 percent chance of rainfall forecast by the National Weather Service during construction, and immediately upon completion of construction, to prevent the mobilization of pollutants and sediment off-site. National Weather Service forecasts for the City of Redding shall be monitored by the Contractor to determine the chance of precipitation.

14. Water discharged as a result of pipeline pressure testing, dewatering, or other means shall be free of all contaminants, pollutants, and chemicals. In no case shall such water be discharged to streams, ditches, storm drains, or other waterways or areas whereby the

APPROVED
Packet Pg. 753 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 53 water eventually discharges over the surface of the ground to such areas without the prior written consent of the Engineer.

15. All open trenches shall be covered with steel plates or restored to original surface conditions at the end of each day.

16. Excavated trench materials shall not be placed or stored on any paved streets, gutters, or sidewalks.

Definitions
Cementitious Materials: Any substance containing concrete, cement, grout, or related materials, in either it’s cured, wet, or dry form, including discharge water when its pH has been altered due to contact with such substances.

Contractor Environmental Manager (CEM): The Contractor’s designated representative that shall coordinate, manage, and ensure implementation of all environmental related measures as required by the Permits and these Specifications.

Environmental Sensitive Area (ESA): That area delineated by the plans, specifications, Permits, or on the project site, that must be protected and avoided during construction, including protection from pollutant laden construction- or storm-water run-off. No access shall be allowed unless approved by the Engineer.

Riparian Vegetation: That specific vegetation community growing along and within the corridors of creeks, streams, rivers, lakes, and other aquatic habitats, including their floodplain, which is typically affected by the hydrology and wet soil conditions.

Stormwater Pollution Prevention Plan (SWPPP): The stormwater pollution prevention plan is a contractor prepared document required by the State Water Resources Control Board, Statewide National Pollutant Discharge Elimination System (NPDES) Construction General Permit, Water Quality Order 2009-0009-DWQ for storm water and non-storm water discharges associated with construction activities. The SWPPP shall be prepared pursuant to these specifications.

Watercourse: Drainage Channel, Creek, Stream Channel, Stream Banks, Banks, Stream, Stream Course, Streambed, Creek, Creek Bed, Bed and Bank, Ordinary High Water Mark, High Water Mark, Active Stream Channel.

Water Pollution Control Plan (WPCP): The water pollution control plan is a contractor prepared document required by the City of Redding pursuant to the State Water Resources Control Board, Statewide National Pollutant Discharge Elimination System (NPDES) MS4 General Permit, No. CAS000004 for storm water and non-storm water discharges associated with construction activities. The WPCP shall be prepared pursuant to these specifications.

Waters of the State, Waters of the U.S.: Any surface water or groundwater, or areas that hold such waters, including saline waters, within the boundaries of the state.

Work Boundary: Environmental Study Limits, Construction Limits, Project Work Limits: That area delineated by the plans, specifications, approvals, or on the project site, in which all work must be completed. No work is allowed outside of this limit without the written approval of the Engineer.

APPROVED
Packet Pg. 754 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 54 2-10 DISPUTED WORK
Delete the first paragraph in its entirety and replace with the following:
“In accordance with Public Contract Code Section 9204 the following shall apply to any claim by Contractor:
“Claim” means a separate demand by a contractor, which includes any of the following. (1) a time extension, including, without limitation, for relief from damages or penalties for delay assessed by the City, (2) payment by the City of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled, (3) payment of the amount that is disputed by the City.

Upon receipt of a claim sent by registered mail or certified mail with return receipt requested, the City will conduct a review of the claim and, within a period not to exceed 45 days, will provide a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, the City and Contractor may, by mutual agreement, extend the time period provided in this subdivision.

The Contractor shall furnish reasonable documentation to support the claim.

Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the City issues its written statement.

If the Contractor disputes the City’s written response, or if the City fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute.

Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the City shall schedule a meet and confer conference within 30 days for settlement of the dispute.

Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the City shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the City issues its written statement. Any disputed portion of the claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation, with the City and the claimant sharing the associated costs equally. The City and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim.

Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.

For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the time frames in this section.

APPROVED
Packet Pg. 755 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 55 Unless otherwise agreed to by the City and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Public Contractor Code Section 20104.4 to mediate after litigation has been commenced.

This section does not preclude the City from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.

Failure by the City to respond to a claim from a Contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the City’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.

Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.

If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against the City because privity of contract does not exist, the Contractor may present to the City a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the Contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the City shall furnish reasonable documentation to support the clam. Within 45 days of receipt of this written request, the Contractor shall notify the subcontractor in writing as to whether the Contractor presented the claim to the City and, if the original Contractor did not present the claim, provided the subcontractor with a statement of the reasons for not having done so.

A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) the City may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the time frames and procedures set forth in this section.”
The second paragraph of Section 2-10 is amended to read:
“Although not to be construed as proceeding under extra work provisions, the Contractor shall keep records of Disputed Work in accordance with Section 7-4, and shall furnish the records to the Agency by the close of the next working day following each date that the Disputed Work is performed. Failure to create and maintain the required records will operate as a waiver of the Disputed Work claim. Failure to present the records to the Agency in the time required herein shall operate as a waiver of the Disputed Work claim for each date that the records are not timely presented.”

APPROVED
Packet Pg. 756 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 56 SECTION 3 CONTROL OF THE WORK
3-3 SUBCONTRACTORS
The second paragraph is amended to read:
“…before work starts, the Contractor shall submit to the Engineer for approval a Subcontracting Request form listing the name, business address, contractor license number, Department of Industrial Relations Public Works Contractor Registration Number, and a description and value of each portion of Work…”
3-5 INSPECTION
Add the following paragraph:
“The City will not make inspections on weekends, holidays, or outside the normal work hours of 7 a.m. to 5 p.m. except when agreed to by the Engineer. At the Engineer’s direction compensation may be demanded of the Contractor if overtime inspections are required (withheld from monies due the Contractor).”
Attention is directed to Caltrans Encroachment Permit No. 0223-NSN-0345 “Signal, Lighting, and Electrical Systems.”
3-8 SUBMITTALS
3-8.4 Supporting Information
Delete Item M and add the following:
m) Data, including, but not limited to, make model, serial number, manufacturer, catalog sheets, manufacturer’s brochures, technical bulletins, and other information necessary to describe a system, product or item. The City will furnish the Contractor with electronic spreadsheet forms (Microsoft Excel) to be completed and submitted to the Engineer. This information is required for motors, instruments, electrical equipment and panels, valves, and pumps as specified in the technical specifications, shown on the plans, directed by the Engineer or these Special Provisions.
n) Operations and Maintenance (O&M) manuals shall be furnished as specified in the technical specifications and these Special Provisions. The Contractor shall furnish an electronic Adobe Acrobat (pdf) copy of the O&M manual.
o) Training shall be provided as specified in the technical specifications and these special provisions. Where applicable the Contractor shall provide video training electronically. 3-10 SURVEY
3-10.1 General
Add the following:
“The Contractor’s attention is directed to Section 400-2, Permanent Survey Markers.”

APPROVED
Packet Pg. 757 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 57 3-12 WORK SITE MAINTENANCE
3-12.6 Water Pollution Control
Delete sections 3-12.6.1 through 3-12.6.3 in their entirety and replace with following:

Prior to any construction activity, the Contractor shall prepare, submit, and obtain approval of a Water Pollution Control Plan (WPCP) that addresses both temporary and permanent erosion control Best Management Practices (BMPs) for stormwater and non-stormwater discharges associated with construction activities. Approval of the WPCP shall not relieve the Contractor of any liability for violations of State or Federal law relating to water pollution. The Contractor shall maintain copies of the WPCP at the project site and it shall be available during construction.

The Contractor shall know and fully comply with applicable provisions of all Federal, State, and local regulations and requirements that govern the Contractor’s operations and stormwater and non-stormwater discharges from both the project site and areas of disturbance outside the project limits during construction.

The WPCP shall address stormwater and non-stormwater discharges from areas immediately outside the project site which are directly related to construction activities for this contract including, but not limited to, asphalt batch plants, material borrow areas, concrete plants, staging areas, storage yards, and access roads. The Contractor shall implement, inspect, and maintain the required water pollution control practices. Installing, inspecting, and maintaining water pollution control practices in areas outside the right-of-way not specifically arranged and provided for by the City of Redding for the execution of this contract, will not be paid for.

The Contractor shall be responsible for penalties assessed or levied on the Contractor or the City of Redding as a result of the Contractor’s failure to comply with the provisions in this section “Water Pollution Control” including, but not limited to, compliance with the applicable provisions of Federal, State, and local regulations and requirements as set forth therein.

Penalties as used in this section, “Water Pollution Control,” shall include fines, penalties, and damages, whether proposed, assessed, or levied against the City of Redding or the Contractor, including those levied under the Federal Clean Water Act, State Fish & Game Code, and the State Porter-Cologne Water Quality Control Act, by governmental agencies or as a result of citizen suits. Penalties shall also include payments made or costs incurred due to stop work orders, work suspension, scheduled days, and/or Contractor delays or in settlement for alleged violations of applicable laws, regulations, or requirements. Costs incurred could include sums spent instead of penalties, due to agency or City imposed mitigation or to remediate or correct violations, or damages resulting from stop work orders, work suspension, or scheduled delays.

Retention of Funds
Notwithstanding any other remedies authorized by law, the City of Redding may retain money due the Contractor under the contract, in an amount determined by the City of Redding, up to and including the entire amount of Penalties proposed, assessed, or levied as a result of the Contractor’s violation of Federal or State law, regulations, or requirements. Funds may be retained by the City of Redding until final disposition has been made as to the Penalties. The

APPROVED
Packet Pg. 758 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 58 Contractor shall remain liable for the full amount of Penalties until such time as they are finally resolved with the entity seeking the Penalties.

Retention of funds for failure to conform to the provisions in this section, “Water Pollution Control,” shall be in addition to the other retention amounts required by the contract. The amounts retained for the Contractor’s failure to conform to provisions in this section will be released for payment on the next monthly estimates for partial payment following the date when an approved WPCP has been implemented and maintained, and when water pollution has been adequately controlled, as determined by the Engineer.

When the City or a regulatory agency identifies a failure to comply with Federal, State, or local requirements, the City will retain money due the Contractor, in the amount of 10 percent of the work done to date or any fine whichever is greater. This amount is in addition to the retention specified in Section 7-3.2, Partial and Final Payment, subject to the following: the City will give the Contractor written notice of the City’s intent to retain funds from partial payments which may become due to the Contractor prior to recording of the Notice of Completion.

During the first estimate period that the Contractor fails to conform to the provisions in this section, “Water Pollution Control,” the City of Redding may retain an amount equal to 25 percent of the estimated value of the contract work performed.

The Contractor shall notify the Engineer immediately upon request from the regulatory agencies to enter, inspect, sample, monitor, or otherwise access the project site or the Contractor’s records pertaining to water pollution control work. The Contractor and the City of Redding shall provide copies of correspondence, notices of violation, enforcement actions, or proposed fines by regulatory agencies to the requesting regulatory agency.

Water Pollution Control Plan Preparation and Approval
As part of the water pollution control work, a WPCP is required for this contract. The WPCP shall conform to the provisions in this section, “Water Pollution Control.” Upon the Engineer’s approval of the WPCP, the WPCP shall be considered to fulfill the provisions in this section, “Prepare Water Pollution Control Plan.”
No work having potential to cause water pollution, shall be performed until the WPCP has been approved by the Engineer. Approval shall not constitute a finding that the WPCP complies with applicable federal, state, and local laws, regulations, permits, and requirements, nor does approval supersede the requirements and provisions of these special provisions or any other federal, state, or local regulations or permit in the event of a conflict.

The WPCP shall be prepared by a Qualified Stormwater Pollution Prevention Plan (SWPPP) Developer (QSD), a registered Civil Engineer experienced in erosion control, or a certified professional Erosion and Sediment Control Specialist. Implementation, monitoring, and maintenance of BMPs shall be by or under the supervision of same. The WPCP should be commensurate with the size, timing, duration, location, and scope of the project. It shall address stormwater run-off and run-on for all disturbed and affected areas of construction, including temporary and permanent measures.

The WPCP shall be submitted to the Engineer for review and approval within 7 calendar days of the Notice to Proceed date. The Contractor shall submit three (3) copies of the draft WPCP to the Engineer. The Engineer will have 5 working days to review the WPCP. If revisions are

APPROVED
Packet Pg. 759 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 59 required, as determined by the Engineer, the Contractor shall revise and resubmit the WPCP within 5 working days of receipt of the Engineer’s comments. The Engineer will have 5 working days to review the revisions. Upon the Engineer’s approval of the WPCP four approved hard copies and one electronic copy of the WPCP shall be submitted to the Engineer. No ground disturbing work shall occur until the WPCP has been approved by the Engineer.

The WPCP shall apply to the areas within and outside of the right-of-way directly related to all construction activities including, but not limited to, material borrow or disposal areas, staging areas, storage yards, and access roads, including those on-site areas developed by the Contractor with third parties for use during the project.

The requirements described herein are considered minimum requirements to satisfy the City of Redding erosion control standards. All BMPs shall be designed, installed, maintained, and otherwise managed pursuant to the provisions set forth in the most recent revision of the California Department of Transportation (Caltrans) Stormwater Quality Handbook, Construction Site BMP Manual, or the most recent revision of the California Stormwater Quality Association (CASQA), California Stormwater PMP Handbook for Construction. The Contractor may recommend equivalent erosion control applications that provide equal or better performance for consideration and approval by the Engineer. Approval of the WPCP by the City shall not relieve the Contractor of any liability for violations of state or federal water pollution control laws, Clean Water Act, Porter-Cologne Water Quality Control Act, Federal Endangered Species Act, State Fish and Wildlife Code, and other applicable laws and regulations. Attention is directed to Sections 5-1, Laws and Regulations, and 5-4, Insurance of the Standard Specifications and these special provisions.

The WPCP shall incorporate water pollution control practices in the following categories:

A. Soil stabilization.

B. Sediment control.

C. Wind erosion control.

D. Tracking control.

E. Non-stormwater management.

F. Waste management and materials pollution control.

The Contractor shall develop a Water Pollution Control Schedule that describes the timing of grading or other work activities that could affect water pollution. The Water Pollution Control Schedule shall be updated by the Contractor to reflect changes in the Contractor’s operations that would affect the necessary implementation of water pollution control practices.

Water pollution control practices shall include both Contractor-selected water pollution control practices from the WPCP and the “Project-Specific Minimum Requirements” identified in the Water Pollution Control Cost Break-Down of this section.

The Contractor shall incorporate water pollution control practices into the WPCP as defined in the CASQA or Caltrans handbooks. Water pollution control practices shall include Contractor- selected water pollution control practices and “Project-Specific Minimum Requirements” identified in the Water Pollution Control Cost Break-Down of this section.

The Contractor shall prepare an amendment to the WPCP such as when there is a change in construction activities or operations which may affect the discharge of pollutants to surface waters, ground waters, or storm drain systems; when the Contractor’s activities or operations

APPROVED
Packet Pg. 760 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 60 violate a condition of these Specifications; when there is a change in the schedule that affects the discharge of pollutants; or when directed by the Engineer. Amendments shall identify additional water pollution control practices or revised operations, including those areas or operations not identified in the initially approved WPCP. Amendments to the WPCP shall be prepared and submitted for review and approval within the time approved by the Engineer.

The Contractor shall keep one copy of the approved WPCP and approved amendments at the project site. The WPCP shall be made available upon request by regulatory resource agency personnel. Requests by the public shall be directed by the Engineer.

Cost Break-down
The Contractor shall include a Water Pollution Control Cost Break-Down in the WPCP which itemizes the contract lump sum price for water pollution control work. The Contractor shall use the Water Pollution Control Cost Break-Down provided in this section as the basis for the cost break-down submitted with the WPCP. The Contractor shall use the Water Pollution Control Cost Break-Down to identify items, quantities and non-adjustable values for water pollution control work, excluding water pollution control practices for which there are separate bid items. The Contractor shall be responsible for the accuracy of the quantities and nonadjustable values used in the cost break-down submitted with the WPCP. Payment for the item of “Prepare Water Pollution Control Plan” will not be made until the Water Pollution Control Cost Break-Down is approved by the Engineer.

Line items indicated in the Water Pollution Control Cost Break-Down with a specified Estimated Quantity shall be considered “Project-Specific Minimum Requirements.” The Contractor shall incorporate Project-Specific Minimum Requirements with the Contractordesignated quantities and values into the Water Pollution Control Cost Break-Down submitted with the WPCP. Line items with estimated quantities can be increased, if desired, by the Contractor. In the Water Pollution Control Cost Break-Down submitted with the WPCP, the Contractor shall list only those water pollution control practices selected for the project, including quantities and non-adjustable values required to complete the work for those items.

The sum of the amounts for the items of work listed in the Water Pollution Control Cost BreakDown shall be equal to the contract lump sum price bid for “Water Pollution Control.” Water pollution control practices listed as separate bid items shall not be included in the contract lump sum amount. Overhead and profit shall be included in the individual items listed in the cost break-down.

WATER POLLUTION CONTROL COST BREAK-DOWN
Contract No.

Item Description Unit Estimated
Quantity Value Amount
Erosion Control (Temporary) Acre
Erosion Control (Permanent) Acre
Straw Mulch Acre
Compost Blanket SQYD

APPROVED
Packet Pg. 761 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 61 WATER POLLUTION CONTROL COST BREAK-DOWN
Contract No.

Item Description Unit Estimated
Quantity Value Amount
Geotextiles, Plastic Covers & Erosion
Control Blankets/Mats SQYD
Wood Mulching SQYD
Earth Dikes/Drainage Swales & Lined
Ditches LF
Outlet Protection/Velocity Dissipation
Devices EA
Slope Drains EA
Silt Fence LF
Desilting Basin EA
Sediment Trap EA
Gravel Check Dam Ton
Fiber Rolls LF
Compost Sock (8”) LF
Compost Sock (12”) LF
Gravel Bag Berm LF
Street Sweeping and Vacuuming LS
Sandbag Barrier LF
Straw Bale Barrier LF
Storm Drain Inlet Protection EA
Wind Erosion Control LS
Stabilized Construction Entrance/Exit EA
Stabilized Construction Roadway EA
Entrance/Outlet Tire Wash EA
Water Conservation Practices LS
Dewatering Operations EA
Paving and Grinding Operations LS
Temporary Stream Crossing EA
Clear Water Diversion EA

APPROVED
Packet Pg. 762 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 62 WATER POLLUTION CONTROL COST BREAK-DOWN
Contract No.

Item Description Unit Estimated
Quantity Value Amount
Illicit Connection/Illegal Discharge
Detection and Reporting LS
Potable Water/Irrigation LS
Vehicle and Equipment Cleaning LS
Vehicle and Equipment Fueling LS
Vehicle and Equipment Maintenance LS
Material Delivery and Storage LS
Material Use LS
Stockpile Management LS
Spill Prevention and Control LS
Solid Waste Management LS
Hazardous Waste Management LS
Contaminated Soil Management LS
Concrete Waste Management LS
Sanitary/Septic Waste Management LS
Liquid Waste Management LS
Total

No adjustment in compensation will be made to the contract lump sum price paid for “Water Pollution Control” due to differences between the quantities shown in the approved cost breakdown and the quantities required to complete the work as shown on the approved WPCP. No adjustment in compensation will be made for ordered changes to correct WPCP work resulting from the Contractor’s own operations or from the Contractor’s negligence.

The approved cost break-down will be used to determine partial payments during the progress of the work and as the basis for calculating the adjustment in compensation for the item of “Water Pollution” Control due to increases or decreases of quantities ordered by the Engineer.

When an ordered change increases or decreases the quantities of an approved cost breakdown item, the adjustment in compensation will be determined in the same manner specified for increases and decreases in the quantity of a contract item of work in conformance with the provisions of Section 2, “Scope of Work,” of the Standard Specifications. If an ordered change requires a new item which is not on the approved cost break-down, the adjustment in compensation will be determined in the same manner specified for extra work in conformance with Section 7-4, “Extra Work,” of the Standard Specifications.

APPROVED
Packet Pg. 763 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 63 WPCP Implementation
If there is a discrepancy between the WPCP and these special provisions, the special provisions shall supersede. Unless otherwise specified, upon approval of the WPCP, the Contractor shall be responsible throughout the duration of the project for installing, constructing, inspecting, maintaining, replacing, removing, and disposing of temporary water pollution control practices, and installing, constructing, inspecting, maintaining, and replacing permanent water pollution control practices specified in the WPCP, including amendments.

The duration of work includes that time period between initial mobilization to the site and acceptance of the work. Unless otherwise directed by the Engineer, the Contractor’s responsibility for WPCP implementation shall continue throughout temporary suspensions of work. Requirements for installation, construction, inspection, maintenance, replacement, removal, and disposal of water pollution control practices shall conform to the requirements in these special provisions and to project permits.

Installing, inspecting, and maintaining water-pollution control practices on areas outside the right-of-way (or designated work area) not specifically arranged and provided for by the City of Redding for the execution of this contract, will not be paid for.

If the Contractor or the Engineer identifies a deficiency in the implementation of the approved WPCP or amendments, the deficiency shall be corrected immediately unless requested by the Contractor and approved by the Engineer in writing, but shall be corrected prior to the onset of precipitation. If the Contractor fails to correct the identified deficiency by the date agreed or prior to the onset of precipitation, the project shall be in nonconformance with this section, “Water Pollution Control.”
If the Contractor fails to conform to the provisions of this section, the Engineer may order the suspension of construction operations and/or may hire a third party to correct the deficiency.

All costs associated with such work will be deducted from the Contractor’s retention.

Year-Round Implementation Requirements
Implementation of water pollution control practices may vary by season. The Contractor shall have a year-round program for implementing, inspecting, and maintaining water pollution control practices for wind erosion control, tracking control, non-stormwater management, and waste management and materials pollution control.

The National Weather Service weather forecast shall be monitored and used by the Contractor on a daily basis. If 50 percent or greater precipitation is predicted, the necessary water pollution control practices shall be deployed prior to the onset of the precipitation. If there is less than a 50 percent chance of precipitation, the Contractor shall still be responsible for ensuring the project site does not result in a discharge of pollutants off-site. Regardless of the chances of precipitation, the Contractor shall allow adequate time to properly install all required BMPs prior to precipitation.

Disturbed soil areas shall be considered active whenever the soil disturbing activities have occurred, continue to occur, or will occur during the ensuing 14 days. Non-active areas shall be stabilized with water pollution control practices within 14 days of cessation of soil disturbing activities or prior to the onset of precipitation, whichever occurs first.

APPROVED
Packet Pg. 764 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 64 Maintenance
To ensure the proper implementation and functioning of water pollution control practices, the Contractor shall regularly inspect and maintain all water pollution control practices identified in the WPCP. The construction site shall be inspected by the Contractor as follows:

A. Prior to a forecast storm.

B. After a precipitation event which causes site runoff.

C. At 24-hour intervals during extended precipitation events.

D. Routinely, a minimum of once every two weeks.

The Contractor shall use a Stormwater Quality Construction Site Inspection Checklist approved by the Engineer. One copy of each site inspection record shall be submitted to the Engineer within 24 hours of completing the inspection.

Report of Discharges, Notices, or Orders
If the Contractor identifies discharges from the project site, regardless of source, in a manner causing, or potentially causing, a condition of pollution in surface waters, or drainage systems, the Contractor shall immediately inform the Engineer. In addition, the Contractor shall submit a written Notice of Discharger report to the Engineer within 24 hours of the discharge event.

The report shall include the following information:

A. The date, time, location, nature of the operation, and type of discharge, including the cause or nature of the notice or order.

B. The water pollution control practices deployed before the discharge event.

C. The date of deployment and type of water pollution control practices deployed after the discharge event, including additional measures installed or planned to remediate and clean-up the discharge, and/or reduce or prevent reoccurrence.

D. An implementation and maintenance schedule for affected water pollution control practices.

Report of First-Time Non-Stormwater Discharge
The Contractor shall notify the Engineer at least 3 days in advance of first-time nonstormwater discharge events. The Contractor shall notify the Engineer of the operations causing non-stormwater discharges and shall obtain field approval for first-time nonstormwater discharges. Non-stormwater discharges shall be monitored at first-time occurrences and routinely thereafter.

If the Contractor receives a written Notice, Order, or other non-compliance action letter from a regulatory agency as a result of stormwater or other discharges from the project site, the Contractor shall immediately notify the Engineer. The Contractor shall be solely responsible for responding to and complying with the Notice, Order, or action letter, unless otherwise directed by the Engineer.

Unless otherwise directed in this Section, the Contractor shall submit for approval, all inspection reports, monitoring reports, action plans, notices, amendments, and other documentation required in these special provisions, to the Engineer within 3 days of their completion. If the documents are not complete and sufficient, the Engineer will return them to the Contractor for resubmittal. The Contractor shall be responsible for submitting complete,

APPROVED
Packet Pg. 765 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 65 accurate, and detailed reporting documents sufficient to satisfy all conditions of these special provisions and any pertinent regulatory agency requirements.

Payment
The contract lump sum price paid for “Prepare Water Pollution Control Plan” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all the work involved in developing, preparing, obtaining approval of, revising, and amending the WPCP, and as directed by the Engineer.

No additional payment will be made to correct deficiencies in the approved WPCP or Amendments.

Payments for “Prepare Water Pollution Control Plan” will be made as follows:

A. After the WPCP has been approved by the Engineer, 75 percent of the contract item price for “Prepare Water Pollution Control Plan” or $5,000 whichever is less will be included in the monthly progress payment.

B. The payment for the balance of the contract item price for “Prepare Water Pollution Control Plan” will be made with the final progress payment.

The contract lump sum price paid for “Water Pollution Control” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in water pollution control, complete in place, including implementing the WPCP, installing, constructing, maintaining, removing, and disposing of water pollution control practices, reporting, non-stormwater management, and waste management and materials for water pollution control practices as provided for in the approved WPCP, including amendments, except those for which there is a contract item of work as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.

No additional payment will be made for Water Pollution Control Practices necessary to correct deficiencies in the approved WPCP or Amendments.

Water pollution control practices for which there is a contract item of work, will be measured and paid for as that contract item of work.

Payments for “Water Pollution Control” will be made as follows:

A. Monthly progress payments for “Water Pollution Control” will be paid in accordance with Section 7-2, Lump Sum Work, or at the Engineer’s discretion will be based on the monthly project completion percentage.

B. The proposed final estimate payment will include the final balance of payment for this item of work.

APPROVED
Packet Pg. 766 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 66 3-12.6.4 Dewatering
Add the following after the second paragraph:

Temporary Wastewater/Discharge
In the event that the Contractor proposes to discharge any groundwater, runoff, or other project required dewatering to the City’s wastewater collection system, the Contractor will be required to submit a Temporary Wastewater Discharge Application. The Contractor shall submit the application to the City Industrial Waste Division a minimum of two weeks prior to any temporary discharge into the City sanitary sewer system. The Contractor may be responsible for water sampling prior to discharge if the City determines contamination may exist.

At no time shall the Contractor discharge any groundwater, run-off, potable water, or other non-storm water into the storm drain system, creeks, streams, ditches, or other conveyances whereby the water could enter such areas without obtaining written approval from the Regional Water Quality Control Board and the Engineer. Existing discharge permits obtained by the City of Redding for Water Utility operations shall not be used for this purpose.

The cost for the Temporary Wastewater Discharge Application is as follows:
$500 Filing Fee
$8.81/1,000 gallons (Prices valid through 12/31/2023) Volume Cost Full compensation for temporary wastewater discharge shall be considered as included in the prices paid for the various contract items of work involving temporary wastewater discharge and no separate payment will be made therefor.
3-13 COMPLETION, ACCEPTANCE, AND WARRANTY
3-13.3 Warranty
Delete the fourth paragraph and add the following:
“The Contractor shall repair or replace to the satisfaction of the Engineer any or all such work that may prove defective in workmanship or materials within that period, ordinary wear and tear and unusual abuse or neglect excepted, together with any other work which may be damaged or displaced in so doing.

In the event of failure to comply with the above mentioned conditions within a reasonable time after being so notified in writing, the Engineer is authorized to have the defects repaired and made good at the expense of the Contractor who will pay the costs and charges therefore immediately upon demand.

The signing of the agreement by the Contractor shall constitute execution of the above guaranties. A contract maintenance bond shall remain in full effect during the guaranty period and will not be released until the expiration of such period. Said bond shall be in an amount equal to 50 percent of the final contract price. The Maintenance Bond shall be submitted on the form contained in these specifications or on the form which conforms to it prior to release of final payment (less retention) for the work.”

APPROVED
Packet Pg. 767 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 67 SECTION 4 CONTROL OF MATERIALS
4-1 GENERAL
Add the following sentence to the first paragraph:
“If required by the Engineer, the Contractor shall furnish duplicate invoices to the Engineer on all material furnished to the job.”
Add the following paragraph:
“If the Contractor does not remove such condemned work and materials within a reasonable time, fixed by written notice, the City may remove them and may store the material at the expense of the Contractor. If the Contractor does not pay for the expense of the removal within 10 days written notice, the City may sell such material at auction or at private sale, and may account for the net proceeds thereof, after deducting all the costs and expenses that should have been borne by the Contractor.”
4-1.2 Protection
Add the following after the first sentence of the first paragraph:
“Unless otherwise specifically stated in the special provisions, any existing equipment or material either to be salvaged or reused in the work shall be restored and protected by the Contractor and shall remain the property of the Agency. Equipment shall be removed with care to prevent unnecessary damage.”
SECTION 5 LEGAL RELATIONS & RESPONSIBILITIES
5-1 LAWS AND REGULATIONS
Add the following after the first paragraphs:
“Contractor shall post job site notices as prescribed by regulation.” Title VI Assurances
During the performance of this Agreement, the Contractor, will ensure that no person is excluded from participating in, denied the benefits of, or otherwise subjected to discrimination under any of its projects, activities, or services and business opportunities on the basis of race, color, national origin, age, sex, or disability as afforded by Title VI of the Civil Rights Act of 1964 and related statutes, as amended. All persons, regardless of their citizenship status, are covered under this regulation.

Equal Employment Opportunity Clause
During the performance of this contract, the Contractor agrees as follows:

1. The Contractor will not discriminate against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, medical disability, medical condition, genetic information,

APPROVED
Packet Pg. 768 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 68 marital status, sex, gender, gender identity, gender expression, age, or sexual orientation of such persons. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, sex, sexual orientation, domestic partners, or national origin. Such action shall include, but not be limited to the following: Employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous spaces, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause.

2. The Contractor will, in all solicitations or advertisement solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, domestic partners, or national origin.

3. The Contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice advising the said labor union or workers’ representatives of the Contractor’s commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.

4. The Contractor will comply with all provisions of Executive Order NO. 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.

5. The Contractor will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders.

6. In the event of the Contractor’s noncompliance with the nondiscrimination clauses of this contract or with any rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor may be declared ineligible for further City contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order No. 11246 September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.

7. The Contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order No. 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The Contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in, or is threatened with litigation with a subcontractor or vendor as a result of such direction by the

APPROVED
Packet Pg. 769 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 69 administering agency, the Contractor may request the City to enter into such litigation to protect the interests of the City.”
5-3 LABOR
5-3.2 Prevailing Wage
Add the following paragraphs:
“All contractors and subcontractors shall furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement).

The Contractor and its agents shall comply with Sections 1771, 1774-1776, 1777.5, 1813, and 1815 of the Labor Code.

Attention is directed to Section 1735 of the Labor Code, which reads as follows:

A contractor shall not discriminate in the employment of persons upon public works on any basis listed in subdivision (a) of Section 12940 of the Government Code, as those bases are defined in Sections 12926 and 12926.1 of the Government Code, except as otherwise provided in Section 12940 of the Government Code. Every contractor for public works who violates this section is subject to all the penalties imposed for a violation of this chapter.”
5-3.3 Payroll Records
Add the following paragraph:
“When submitting certified payroll, eliminate the social security number. Should the City request certified payrolls with social security numbers, hard copies shall be provided.

Disclaimer:

Electronic submission of information is offered for convenience of the submitting party. When submitting any information electronically, the submitting party agrees and accepts full responsibility for such submission(s), including, but not limited to, any subsequent disclosure by the City, intentional, or otherwise. The City accepts no responsibility or liability for any information submitted electronically.”
5-3.5 Apprentices
Add the following after the first paragraph:
“The provisions in Section 1777.5 and Section 1777.6 of the California Labor Code concerning the employment of apprentices shall be complied with by the Contractor or any subcontractor under him.

The responsibility for compliance with this section for all apprenticeship occupations shall rest solely with the prime Contractor.

Compliance with California Labor Code Section 1777.5 requires all public works contractors and subcontractors to:

APPROVED
Packet Pg. 770 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 70 Submit contract award information to the applicable joint apprenticeship committee which shall include an estimate of journeyman hours to be performed under the contract, the number of apprentices to be employed, and the approximate dates the apprentices will be employed.

Employ apprentices on the public work in a ratio to journeymen of no less than one hour of apprentices work for every five hours of labor performed by a journeyman.

Pay the apprentice rate on public works projects only to those apprentices who are registered, as defined in Labor Code Section 3077.

Contribute to the training fund in the amount indicated in the PWR publication for journeymen and apprentices. Contractors who choose not to contribute to the local training trust fund must make their contributions to the California Apprenticeship Council, P. O. Box 420604.

Information relative to apprenticeship standards, wages schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from Sacramento of Division of Apprenticeship Standards, Telephone (916) 263-2877.” 5-4 INSURANCE
Delete Sections 5-4.1 through 5-4.4 in its entirety and replace with following:
“Liability Insurance and Auto Insurance
The Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, its agents, representatives, employees or subcontractors.

The Contractor shall furnish the Agency a policy or certificate evidencing liability insurance with original endorsements effecting coverage required by this subsection. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by the Agency before work commences.

Notwithstanding any inconsistent statement in the policy or any subsequent endorsement attached thereto, the Agency shall be the insured or named as an additional insured covering the work, whether liability is attributable to the Contractor or the Agency. Except as provided for in Subsection 6-5, the Agency, its officers, officials, employees, and agents are to be covered as insured for general liability and automobile liability, and contractor’s pollution insurance as respects: liability arising out of activities performed by or on behalf of the Contractor; with limits of liability indicated below and including coverage no less than the following:

APPROVED
Packet Pg. 771 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 71 1 Premises and operations.
2 Products and completed operations. Completed Operations Liability shall be kept in force for one year after the date of final acceptance by the City. 3 Contractual liability insuring the obligations assumed by the Contractor in this contract.
4 Broad form property damage (including completed operations). 5 Fire legal liability, Explosion, Collapse and Underground Hazards. 6 Personal Injury Liability.
7 Independent Contractors.
8 Contractor’s Pollution Insurance.

The coverage shall provide the following minimum scope and limits:

1. Insurance Services Office Commercial General Liability coverage (occurrence form CG 001) in the amount of $1,000,000 per occurrence for bodily injury, personal injury, and property damage.

2. Insurance Services Office Automobile Liability Code 1 (any auto) (form CA 0001, Ed 1/87), in the amount of $1,000,000 per accident for bodily injury and property damage.

3. Course of Construction Insurance providing coverage for all “risks” of loss in the amount of the completed project value.

4. Contractor Pollution Liability, in the amount of $1,000,000, to include but not limited to coverage for bodily injury, property damage and cleanup arising from pollution conditions created by the Contractor or encountered during work at job site. Coverage must apply to cleanup, damage or injury that occurs on, or that originates from, the site.

Insurance is to be placed with insurers with current A.M. Best’s rating of not less than A-: VII.

Any deductibles or self-insured retentions must be declared to and approved by the Agency.

At the option of the Agency, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the Agency, its officers, officials, employees, and agents; or the Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses.

All liability policies shall bear an endorsement or shall have attached a rider whereby it is provided that:

1. The Agency, its officers, officials, employees and agents are added as additional insureds.

APPROVED
Packet Pg. 772 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 72 2. For any claims related to this project; the Contractor’s insurance coverage shall be primary insurance as respects the Agency, its officers, officials, employees, and agents shall be excess of the Contractor’s insurance and shall not contribute with it.

3. Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the Agency, its officers, officials, employees, or agents.

4. The Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

5. In the event of expiration or proposed cancellation of such policies for any reason whatsoever, the Agency shall be notified by registered mail return receipt requested, giving a sufficient time before the date thereof to comply with any applicable law or statue but in no event less than 30 days before expiration or cancelation is effective.

Course of construction policies shall bear an endorsement or shall have attached a rider whereby it is provided that:

1. The Agency shall be named loss payee.

2. The insurer shall waive all rights of subrogation against the Agency.

The Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsement of each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated herein.

Workers’ Compensation Insurance
Said certification is included in the contract by reference and signature and return of the contract shall constitute signing and filing of said certificate.

The Contractor shall also comply with Section 3800 of the Labor Code by securing, paying for and maintaining in full force and effect for the duration of the contract Workers’ Compensation Insurance, with limits as required by the Labor Code of the State of California and Employee’s Liability with limits of $1,000,000 per accident. The Workers’ Compensation insurance must be accompanied by a Waiver of Subrogation endorsement. The Contractor shall furnish a Certificate of Insurance to the Engineer before execution of the Contract. The agency, its officers, officials, employees, and agents, will not be responsible for any claims in law or equity occasioned by failure to the Contractor to comply with this paragraph.

All compensation insurance policies shall bear an endorsement or shall have attached a rider whereby it is provided that, in the event of expiration or proposed cancellation of such policies for any reason whatsoever, the Agency shall be notified by registered mail not less than 30 days before expiration or cancellation is effective.

No separate payment will be made for insurance. Payment shall be considered as included in the contract price.

APPROVED
Packet Pg. 773 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 73 5-4.5 Contractor’s Performance
To the fullest extent permitted by law, the Contractor shall indemnify, defend and hold harmless the City and its officials, employees, agents, representatives and volunteers from and against any and all losses, claims, demands, damages, costs, expenses, attorney’s fees, or liability of every nature arising out of or in any way connected with the performance or attempted performance of the provisions of this Contract, caused in whole or in part by any negligent or willful act or omission of the Contractor, regardless of whether caused in part by a party indemnified hereunder. Nothing contained in the foregoing indemnity provisions shall be construed to require the Contractor to indemnify the indemnified party in contravention of Section 2782 of the Civil Code for the active or sole negligence or willful misconduct of that indemnified party.

To the fullest extent permitted by law, the Contractor’s duty to defend shall extend, without limitation, to any suit or action founded upon any losses, claims, demands, damages, costs, expenses, attorney’s fees, or liability of every nature arising out of or in any way connected with the performance or attempted performance of the provisions hereof, or in any way arising out of or connected with this Contract.

The defense and indemnity obligations expressly extend to and include any and all claims, demands, damages, costs, expenses, liability occasioned as a result of the violation by the Contractor, the Contractor’s agents, employees, or independent contractors, subcontractors, or suppliers of any provisions of federal, state or local law, including applicable administrative regulations.

The defense and indemnity obligations also expressly extend to and include any claims, demands, damages, costs, expenses, or liability occasioned by injury to or death of any person, or any property damage to property owned by any person while on or about the site or as a result of the Work, whether such persons are on or about the site by right or not, whenever the Work is alleged to have been a contributing cause in any degree whatsoever.

In claims against any person or entity herein indemnified that are made by an employee of the Contractor or an employee of any of the Contractor’s agents, independent contractors, subcontractors or suppliers, a person indirectly employed by the Contractor or by any of the Contractor’s agents, independent contractors, subcontractors or suppliers, or anyone for whose acts the Contractor or any of the Contractor’s agents, independent contractors, subcontractors, or suppliers may be liable, the defense and/or independent contractors, subcontractors, or suppliers under workers’ compensation acts, disability acts, or other employee benefit acts.

The defense and indemnification obligations herein shall not be limited by any assertion or finding that the person or entity indemnified is liable by reason of non-delegable duty.

The defense and indemnities set forth herein shall not be limited by the insurance requirements set forth in the Contract.

The defense and indemnification requirements herein set forth shall extend to claims occurring after this Contract is terminated as well as while it is in force.

Indemnification of Adjacent Property Owners
In the event the Contractor enters any agreement with the owners of any adjacent property to enter upon or adjacent to such property for the purpose of performing this Contract, the Contractor shall fully indemnify, defend and save harmless such person, firm, or corporation, state or other

APPROVED
Packet Pg. 774 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 74 governmental agency which owns or has any interest in the adjacent property. The form and content of the indemnification agreement shall be approved by the Agency prior to commencement of any work on or about such property. The Contractor also shall indemnify the Agency, its officers, officials, employees, agents, representatives, and volunteers a provided in the Contract. These provisions shall be in addition to any other requirements of the owners of adjacent property.”
5-7 SAFETY
5-7.1 Work Site Safety
5-7.1.1 General
Add the following:
“Accidents
The Contractor shall provide at the site, such equipment and medical facilities as are necessary to supply first aid service to anyone who may be injured in connection with the work.

The Contractor must promptly report in writing to the Engineer all incidents whatsoever arising out of, or in connection with, the performance of the work whether on, or adjacent to the site, which caused death, personal injury, or property damages, giving full details and statements of witnesses. In addition, if death or serious injuries or serious damages are caused, the incident shall be reported promptly by telephone or messenger to both the Engineer and owner, if other than Agency.

If any claim is made by anyone against the Contractor or any subcontractor on account of any accident, the Contractor shall promptly report the facts in writing to the Engineer, giving full details of the claim.”
Attention is directed to Caltrans Encroachment Permit No. 0223-NSN-0345 “Public Safety Control.”
5-7.4 Hazardous Substances
Add the following paragraphs:
“When applicable, the Contractor shall file with the Redding Fire Department and the Shasta County Department of Public Health, hazardous materials release response plans and inventories (business plans) and Shasta County Department of Public Health fees for the prevention and mitigation of hazardous material releases in accordance with Chapter 6.95 of the California Health and Safety Code.

Contractors, including subcontractors, shall not perform work on or around City of Redding Asbestos Cement Pipe (ACP) infrastructure unless the Contractor has had and can provide appropriate documentation of approved ACP initial and refresher training in compliance of all federal, State and local laws, regulations and standards.

APPROVED
Packet Pg. 775 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 75 Training Requirements
No employee or contractor is permitted to handle or work on or around ACP without completing an approved training course on ACP.”
SECTION 6 PROSECUTION AND PROGRESS
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK
6-1.1 Construction Schedule
Add the following after the first paragraph:
“A weekly construction schedule shall be furnished in writing, if required by the Engineer, one working day prior to the first working day of the week to which the schedule is pertinent. The weekly construction shall be in such form and in such detail as to accurately and clearly show the major type and location of the work to be performed during the work week. In addition, all requests for survey work required to be provided by the City shall be a part of this schedule.” 6-2 PROSECUTION OF THE WORK
Add the following paragraph:
“Work Done by the Agency for the Contractor
The City will not perform any work for the Contractor except in emergency situations or as otherwise agreed to by the Engineer. The City will be reimbursed for any work done for the Contractor (withheld from monies due the Contractor). This will include all costs (direct straight time or overtime wages, all overhead, administration, engineering, vehicle, and equipment costs).”
6-9 LIQUIDATED DAMAGES
Delete this section in its entirety and add the following:
“Failure of the Contractor to complete the Work within the time allowed will result in damages being sustained by the Agency. Such damages are, and will continue to be, impracticable and extremely difficult to determine. For each consecutive calendar day in excess of the time specified, as adjusted in accordance with Subsection 6-4, for completion of the Work the Contractor shall pay to the Agency, or have withheld from monies due it, the sum of $1,000.

Execution of the Contract shall constitute agreement by the Agency and Contractor that $1,000 per day is the minimum value of the costs and actual damage caused by failure of the Contractor to complete the Work within the allotted time, that such sum is liquidated damages and shall not be construed as penalty, and that such sum may be deducted from payment due the Contractor if such delay occurs.”

APPROVED
Packet Pg. 776 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 76 SECTION 7 MEASUREMENT AND PAYMENT
7-2 LUMP SUM WORK
Add the following section:
“Lump Sum Cost Schedule of Values
The Contractor shall furnish to the Engineer a schedule of values for each contract lump sum item of work described in this section.

The Contractor shall determine the quantities required to complete the work shown on the plans. The quantities and values shall be included in the schedule submitted to the Engineer for approval. The Contractor shall be responsible for the accuracy of the quantities and values used in the schedule submitted for approval. Any quantities shown on the plans or noted in these specifications are approximate and shall be considered as informational only.

No adjustment in compensation will be made in the contract lump sum prices paid for the various work items due to any differences between the quantities shown in the cost breakdown furnished by the Contractor, or the planned quantities, and the quantities required to complete the work as shown on the plans and as specified in these special provisions.

The sum of the amounts for the units of work listed in the cost break-down shall be equal to the contract lump sum price bid for the work. Overhead, profit, bond premium, temporary construction facilities, plant and other items shall be included in each individual unit listed in the cost break-down and shall not be listed separately.

The cost break-down shall be submitted to the Engineer for approval within 15 days after the contract has been approved. The cost break-down shall be approved, in writing, by the Engineer before any partial payment for the lump sum items of work will be made.

At the Engineer’s discretion the approved cost break-down schedule may be used to determine partial payments during the progress of the work and as the basis of calculating the adjustment in compensation for the item or items of work due to changes ordered by the Engineer. When an ordered change increases or decreases the quantities of an approved schedule, the adjustment in compensation may be determined at the Engineer’s discretion in the same manner specified for increases and decreases in the quantity of a contract item of work in accordance with Section 2, “Scope of the Work” of the Standard specifications and elsewhere in these special provisions.”
7-3 PAYMENT
7-3.1 General
Add the following paragraphs:
“’In accordance with Labor Code Section 3700, every contractor will be required to secure the payment of compensation to his or her employees.

Attention is directed to the provisions of Sections 10262 and 10262.5 of the Public Contact Code and Section 7108.5 of the Business and Professions Code concerning prompt payment to subcontractors.

APPROVED
Packet Pg. 777 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 77 The Contractor shall return all moneys withheld in retention for the subcontractor within 30 days after receiving payment for work satisfactorily completed, even if the other contract work is not completed and has not been accepted. This requirement shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the Contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the Contractor or deficient subcontract performance or noncompliance by a subcontractor.” Delete the last sentence of the eighth paragraph and substitute the following:
“Prior to the expiration of 60 days from the date of completion, or as prescribed by law, the amount deducted from the final progress pay estimate and retained by the Agency will be paid to the Contractor, except 125 percent of such amounts as are required by law to be withheld by properly executed and filed notices to stop payment, or as may be authorized by the contract to be further retained. Upon settlement of all notices to stop payment, any remaining funds held by the Agency, less an amount for expenses incurred by the Agency in conjunction with the notice(s) to stop payment will be paid to the Contractor.” Add the following paragraph:
“Manufacturers’ warranties and guarantees furnished for materials used in the work and instruction sheets and parts lists supplied with materials shall be delivered to the Engineer prior to acceptance of the project.”
7-3.2 Partial and Final Payment
The first paragraph shall read:
“The closure date for the purpose of making monthly progress payments shall be the last Friday of the month.”
Delete the third paragraph and substitute the following:
“From each progress payment, 5 percent will be deducted and retained by the Agency, and the remainder less the amount of all previous payments will be paid. Administrative deductions for missing documents including, but not limited to, as-builts, product warranties, operation and maintenance manuals, and bonds may be taken. Each administrative deductions withheld will be a minimum of $5,000 and a maximum of $25,000.

In accordance with Labor Code Section 1771.5(b)5, the Agency shall withhold contract payments when payroll records are delinquent or inadequate.

In accordance with Labor Code Section 1771.5(b)6, the Agency shall withhold contract payments equal to the amount of underpayment and applicable penalties when, after investigation, it is established that underpayment has occurred.” Add the following after the last paragraph:
“Final Pay Quantities
When an item of work is designated as (F) or (S-F) in the Engineer’s Estimate, the estimated quantity for that item of work shall be the final pay quantity, unless the dimensions of any

APPROVED
Packet Pg. 778 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 78 portion of that item are revised by the Engineer, or the item or any portion of the item is eliminated. If the dimensions of any portion of the item are revised, and the revisions result in an increase or decrease in the estimated quantity of that item of work, the final pay quantity for the item will be revised in the amount represented by the changes in the dimensions. If a final pay item is eliminated, the estimated quantity for the item will be eliminated. If a portion of a final pay item is eliminated, the final pay quantity will be revised in the amount represented by the eliminated portion of the item of work.

The estimated quantity for each item of work designated as (F) or (S-F) in the Engineer’s Estimate shall be considered as approximate only, and no guarantee is made that the quantity which can be determined by computations, based on the details and dimensions shown on the plans, will equal the estimated quantity. No allowance will be made in the event that the quantity based on computations does not equal the estimated quantity.

In case of discrepancy between the quantity shown in the Engineer’s Estimate for a final pay item and the quantity or summation of quantities for the same item shown on the plans, payment will be based on the quantity shown in the Engineer’s Estimate.” 7-3.3 Delivered Materials
Add the following paragraph:

When an item of work is designated as (P) the Agency will include in the progress payments 50 percent of the cost of materials delivered but not incorporated in the work when requested by the Contractor. Before these costs will be included, the Contractor must present to the Engineer, copies of his invoices.
7-4 PAYMENT FOR EXTRA WORK
7-4.2 Basis for Establishing Costs
7-4.2.1 Labor
The first paragraph is amended to read:
“The cost of labor shall be the actual wages paid which shall include any employer payments to or on behalf of the workers for health and welfare, pension, vacation, and apprenticeship funds. To the actual wages paid will be added a labor surcharge set forth in the Department of Transportation publication entitled Labor Surcharge and Equipment Rental Rates found at the following web site.
http://www.dot.ca.gov/hq/construc/equipmnt.html
The rates are in effect on the date upon which the work is accomplished. The labor surcharge shall constitute full compensation for all payments imposed by State and Federal laws including, but not limited to, workers’ compensation insurance, and liability insurance.”

APPROVED
Packet Pg. 779 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 79 7-4.2.3Tool and Equipment Rental
Delete the second paragraph and add the following:
“Regardless of ownership; the latest edition of the State of California Department of Transportation equipment rental rates shall be used to determine equipment rental costs.” 7-4.3 Markup
Delete this section in its entirety and add the following:
a. Work by Contractor. The following percentages shall be added to the Contractor’s costs and shall constitute full payment for all overhead and profit.

Overhead costs shall include, but not be limited to such items as project superintendence, project managers, field and home office expenses.
1) Labor 35%
2) Material 15%
3) Equipment Rental & Other Items 15%
4) Subcontractor Work 10% (this markup may be applied a maximum of one time to the extra work bill)
b. Work by Subcontractor. When extra work is performed by a subcontractor, the following percentages shall be added to the subcontractor’s costs and shall constitute full payment for all overhead and profit.

Overhead costs shall include, but not be limited to such items as project superintendence, project managers, field and home office expenses.
1) Labor 35%
2) Material 15%
3) Equipment Rental & Other Items 15%
4) Second-Tier Subcontractor 10% (this markup may be applied a maximum of one time to the extra work bill)

APPROVED
Packet Pg. 780 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 80 PART 2 MODIFICATIONS TO CONSTRUCTION MATERIALS
SECTION 200 ROCK MATERIALS
200-2 UNTREATED BASE MATERIALS
200-2.2.2 Grading
Delete this paragraph and substitute the following:
“'The aggregate shall be uniformly graded and shall conform to the State of California Department of Transportation Standard Specifications Section 26 “Aggregate Base” grading requirements for Class 2 Aggregate Base, ¾-inch (20 mm) maximum size.” SECTION 203 BITUMINOUS MATERIALS
203-6 ASPHALT CONCRETE
203-6.1 General
The first sentence of the first paragraph is amended to read:
“…mineral aggregate and up to 25 percent reclaimed asphalt pavement (RAP…” Delete the second paragraph.

The third paragraph is amended to read:
“Unless otherwise specified, the Contractor shall submit a mix design for ½ inch, Type A Hot Mix Asphalt with PG 64-10 that has been preapproved by the California Department of Transportation (Caltrans) or is in compliance with the current Caltrans Standard Specifications.”’
SECTION 207 GRAVITY PIPE
207-1 NONREINFORCED CONCRETE PIPE
207-1.1 General
Add the following paragraph:
“Nonreinforced concrete pipe shall be extra strength.”
207-2 REINFORCED CONCRETE PIPE (RCP)
207-2.1 General
The second paragraph is amended to read:
“The size, type, and strength class of the concrete pipe to be furnished shall be as shown on the Plans.”

APPROVED
Packet Pg. 781 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 81 207-2.9.1 General
The last sentence is amended to read:
“c) Acceptance of certification of compliance with these specifications and inspection of the completed pipe.”
Add the following paragraph:
“The basis for acceptance shall be by certification of compliance with these specifications and inspection of the completed pipe.”
207-15 ABS SOLID WALL PIPE
207-15.1 General
The third sentence is modified to read:
“Minimum wall thickness shall correspond with SDR 23.5” 207-17PVC GRAVITY PIPE
Section 207-17.1 General
Modify Table 207-17.1 as follows:
“Wall Thickness Min. SDR 26”
SECTION 210 PAINT AND PROTECTIVE COATINGS
210-1 PAINT
210-1.5 Paint Systems
Add the following:
“All components to be painted shall be painted as follows:

1. Preparation – Painting preparation shall be accomplished using an industrial strength, biodegradable cleaner to remove all dirt, grease, oil, and other contaminants.

Surfaces shall be thoroughly power washed with water to ensure all residues have been removed. Provide Devoe Devprep 88 or equal.

Aluminum surfaces to be painted shall be treated as described above, then treated with an etching wash such as Jasco Prep and Primer or equal.

Pre-painting preparation shall include removal of all paper signs, masking tape, scotch tape, and similar contaminates that exist on surfaces to be painted.

APPROVED
Packet Pg. 782 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 82 2. Primer – The primer shall be a low VOC, two component high performance, rust inhibitive epoxy coating. Primer thickness shall be 4-8 mils, when dry, 6-8 mils, when wet. Provide Devoe Devran 203 water borne epoxy primer or equal.

3. Finish Coat – The finish coat shall be a low VOC, two component high performance chemically-cured Aliphatic Urethane Gloss Enamel. Finish coat thickness shall be 2- 3 mils when dry, 2.8-4.3 mils when wet. Provide Devoe Devthane 379H or equal.

The industrial cleaner, primer, and finish coat shall all be produced by the same manufacturer and shall be compatible and appropriate for the intended application.

Paint color shall be City of Redding light pole green. Color samples will be provided to the Contractor for color matching.

Five copies of the cleaner, etching wash, primer, and paint specifications including MSDS sheets, shall be submitted to the Engineer for review prior to the start of work.

All work of this item of work shall be done between the hours of 9 p.m. and 6 a.m.

The contract lump sum price paid for “Paint Traffic Signal” at each location shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in painting all the traffic signal equipment at an intersection, complete in place, including preparing surfaces, cleanup, and all extra work and equipment needed to do this item of work at night as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.” SECTION 217 BEDDING AND BACKFILL MATERIALS
217-2 TRENCH BACKFILL
217-2.2 Imported Trench Backfill
Add the following paragraph:
“Backfill material shall be 3-inch (75 mm) maximum in size and shall be reasonably well graded. Any material proposed to be used that has 30 percent or more not passing the ¾- inch (20 mm) sieve will be rejected.”

APPROVED
Packet Pg. 783 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 83 PART 3 MODIFICATIONS TO CONSTRUCTION METHODS
SECTION 300 EARTHWORK
300-2 UNCLASSIFIED EXCAVATION
300-2.2.2 Wet Material
Replace in its entirety with the following:
“If required excavated material is unsatisfactory for the specified use on the project solely because of high moisture content, the Contractor may either process the material to reduce the moisture content to an optimum condition, or to remove the material and replace it with suitable material. The cost of drying or removing and replacing the wet material shall be at the expense of the Contractor.”
300-2.6 Surplus Material
The first sentence of the first paragraph is modified as follows:
“… no surplus excavated material may be disposed of within the right-of-way unless directed by the Engineer. Compaction shall be by wheel rolling as occurs during placement.” 300-2.8 Measurement
Delete all paragraphs of this subsection and add the following:
“There will be no measurement of material excavated from this site.” Add the following paragraphs:
“Payment shall be based on the Engineer’s estimate and is a Final (F) Pay Item.” 300-2.9 Payment
Delete the first sentence of the first paragraph and substitute the following:
“Payment for all unclassified excavation shall be included in the unit prices paid for the various items of work done at the different locations.”
300-4 UNCLASSIFIED FILL
300-4.1 General
Add this sentence to the first paragraph:
“Embankment shall be designated as unclassified fill.”
Add the following paragraphs:
“The preparation, placing, compacting, and other procedures of fill materials (topsoil Class “A”) shall be in conformance with applicable provisions of this section.

APPROVED
Packet Pg. 784 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 84 The fill material (topsoil Class “A”) shall be placed on the site as shown on the drawings. The extent of the placement quantities in the site shall be determined by the Engineer.” 300-4.10 Payment
The first paragraph is amended to read:

Full compensation for unclassified fill shall be considered as included items involved and no further separate payment will be made therefor.”
300-5 BORROW EXCAVATION
300-5.2 Imported Borrow
The second paragraph is amended to read as follows:
“The Contractor shall notify the Engineer sufficiently in advance of opening any borrow site so that adequate time will be allowed for testing the material.”’ 300-5.4 Measurement and Payment
Add the following paragraphs:
“The quantity for measurement of imported borrow shall be that quantity remaining after deducting the calculated unclassified excavation quantity utilizing the cross sections provided in the plans.

Payment for imported borrow shall include full compensation for excavating, sloping, loading, stockpiling, hauling it to its final location, and doing all the work involved in unclassified fill construction.”
“After the removal of the existing concrete or unclassified excavation, the areas shall be prepared as outlined above, aggregate base material added where needed, and the entire area compacted by the use of vibratory plate-type equipment to the specified relative compaction.”
SECTION 301SUBGRADE PREPARATION, TREATED MATERIALS, AND PLACEMENT OF

BASE MATERIALS
301-1 SUBGRADE PREPARATION
301-1.2 Preparation of Subgrade
Add the following paragraphs:

Preparation of subgrade shall include the cutting and trimming of existing AC surfaces to neat straight lines as delineated by the Engineer. It shall also include the excavation and removal of all unclassified excavation material and existing AC surfacing.

APPROVED
Packet Pg. 785 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 85 Existing AC removed may be incorporated into the embankment to be constructed provided it is smaller than six inches (150 mm) in its largest dimension and well distributed throughout the embankment material.
301-1.3 Relative Compaction
Delete the first paragraph and add the following paragraph:
“The top six inches of subgrade material shall be compacted to a relative compaction of 95 percent, except subgrade under driveways and sidewalks shall be compacted to a relative compaction of 90 percent.”
301-1.7 Payment
Add the following paragraph:
“Payment for furnishing and placing additional aggregate base materials and the mechanical compaction of all areas shall be considered as included in the unit prices paid for the work involved, and no additional compensation will be allowed.” 301-2 UNTREATED BASE
301-2.1 General
Replace this paragraph in its entirety with the following:
“Untreated base for pavement, curb, gutter, and similar types of improvements, shall be constructed of material as specified in subsection 200-2.2.2 and as modified in these special provisions.”
301-2.4 Measurement and Payment
The following sentence is added to the first paragraph:
“Payment for furnishing and placing aggregate base shall be considered as included in the unit prices paid for concrete sidewalk, concrete curb, concrete curb and gutter, concrete alley and valley gutters, concrete curb ramps, complete in place, and no additional compensation will be allowed.”
SECTION 302 ROADWAY SURFACING
302-5 ASPHALT CONCRETE PAVEMENT
302-5.1 General
Add the following paragraph after the first paragraph:
“The Contractor shall furnish and place all temporary striping and markings in accordance with the California MUTCD.

When asphaltic emulsion is used as a tack coat, asphalt concrete shall not be placed until the emulsified asphalt has cured.”

APPROVED
Packet Pg. 786 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 86 302-5.4 Tack Coat
Add the following sentence:
“In the first and third paragraphs, the tack coat shall be Grade CSS-1h or SS-1 emulsified asphalt.”
302-5.9 Measurement and Payment
Add the following paragraph:
“Payment for permanent resurfacing shall be considered to be included in the price bid for pipe and appurtenances or structures, complete in place, and no additional compensation will be allowed.”
The second sentence of the first paragraph shall read:
“Such price shall constitute full compensation for preparation of subgrade, apply tack coat if required, and placement of temporary striping and markings.” SECTION 303 CONCRETE AND MASONRY CONSTRUCTION
303-1 CONCRETE STRUCTURES
303-1.12 Payment
Add the following sentence to the second paragraph:
“Payment for concrete structures shall be considered as included in the unit price bid for the various items to which the concrete is pertinent, and no additional compensation will be allowed.”
303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY

INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS
303-5.1.1 General
Delete the second sentence of the first paragraph and substitute the following:
“Cement mortar shall not be used in finishing curbs.”
The first sentence of the second paragraph shall read:
“The minimum thickness of walks shall be 4 inches (100 mm) adjacent to vertical curb and the minimum thickness of walks shall be 6 inches (150 mm) adjacent to roll curb.” 303-5.1.2 Drainage Outlets through Curb
Add the following sentence to the last paragraph:
“Curb drains shall be constructed using Schedule 40 galvanized steel pipe.”

APPROVED
Packet Pg. 787 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 87 303-5.1.3 Driveway Entrances
Delete the first sentence of the second paragraph and substitute the following:
“The fully depressed curb opening at driveway entrances shall be ½-inch (13 mm) plus or minus 1/8-inch (3 mm) above gutter flow line at the curb face.” Delete the last sentence of the third paragraph and substitute the following:
“At residential driveways, the thickness of the walk shall be 6 inches (150 mm) unless otherwise specified.”
303-5.4.2 Expansion Joints
The first sentence of the second paragraph shall read:
“One-half inch (1/2-inch) joints…”
Delete the first sentence of the third paragraph and substitute the following:
“Expansion joint filler ½-inch (13 mm) thick shall be placed in walk at the BC and EC of all walk returns, around all utility poles which may project into the concrete along the line of the work, at commercial driveways, and between the walk and all buildings or other structures at the right-of-way line or when required by the Engineer.” 303-5.4.3 Weakened Plane Joints
The second and third paragraphs are amended to read as follows:
“…intervals not exceeding 12 feet.”
303-5.5.2 Curb
Delete the last two sentences of the first paragraph and substitute the following:
“Cement mortar shall not be used in finishing curb.”
The last sentence of the second paragraph is amended to read:
“The surface of the work shall be finished as prescribed; after which the name of the Contractor, together with the year in which the improvement is constructed, may be stamped therein to a depth of ¼-inch in letters not less than ¾-inch high, at BC and EC of curb returns.” 303-5.9 Measurement and Payment
Add the following paragraphs:
“Full compensation for all required sawcutting, excavation, removal, and disposal of concrete rubble and asphalt concrete pavement, aggregate base placed under curbs, gutters, sidewalks, bus turnouts, and driveways, asphalt concrete tie-in paving and any other items of work necessary to construct curb, gutter, sidewalks, handicap ramps, and driveways shall be

APPROVED
Packet Pg. 788 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 88 considered as included in the unit prices paid for the various items to which the work is pertinent.”
Delete the first paragraph and substitute the following:
“Curb and gutter shall be measured continuous through driveways, handicap ramps, and curb returns. Curb and gutter shall be measured at the top face of curb. Unless otherwise specified elsewhere in these special provisions, curb and gutter shall be paid for at the linear foot price set forth in the bid documents. Local depressions at catch basins shall be included in the unit price paid for catch basins. Curb and gutter for bus turnouts and cross gutter spandrels shall be included in the unit price paid for bus turnouts and cross gutter.” SECTION 306OPEN TRENCH CONDUIT CONSTRUCTION
306-4 SHORING AND BRACING
Add the following:
“All excavations shall be shored per CAL-OSHA requirements.

Work in excavations over 60 inches (5 feet) in depth shall be in strict conformance with CALOSHA requirements.

In the event that the trenching operation exceeds 5 feet in depth, the Contractor shall be responsible for providing and installing trench shoring as required by CAL-OSHA and the cost for such shoring shall be included in the price paid for “Trench Sheeting and Shoring” and no additional compensation will be allowed.

On Public Works’ construction, it shall be understood that the Owner, Owner/Operator, etc., shall be considered the same as an employee or workman for determining conformance with the CAL-OSHA requirements.”
306-6 BEDDING
306-6.1 General
Delete the second sentence of the fourth paragraph and add the following:
“If soft, spongy, unstable, or other similar material is encountered upon which the bedding material or pipe is to be placed, this unsuitable material shall be removed to a depth ordered by the Engineer and replaced with trench stabilization material suitably densified. The Engineer may also require an envelope of an approved filter fabric be installed around the stabilization material if it appears migration of adjacent materials into the stabilization material could be a problem. Addition of trench stabilization material so ordered will be paid for as specified in Section 7-4 “Payment for Extra Work” in the General Provisions. The Contractor shall bear any additional expense for trench excavation, shoring, or dewatering. If the necessity for such trench stabilization material has been caused by an act or failure to act on the part of the Contractor, the Contractor shall bear the entire expense of the additional material.”

APPROVED
Packet Pg. 789 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 89 306-8.9 Pipeline Pressure Testing, Disinfection, and Commissioning 306-8.9.1 General
Add the following sentence to the first paragraph:
“All chlorination, flushing, and testing of new lines shall be accomplished prior to any tie-ins to existing water lines.”
306-8.9.2 Hydrostatic Pressure Test
Delete this section in its entirety and refer to the City of Redding Construction Standards Page 400.50.
306-8.9.4.3 Potable Water System Disinfection Procedures Delete this section in its entirety and refer to the City of Redding Construction Standards Page 400.50.
306-12.4 Jetted Trench Backfill
Replace this section with the following:
“Jetting shall not be considered as a suitable method of compaction.” 306-13.1 Temporary Resurfacing
Add the following paragraph:
“Temporary resurfacing of trenches shall be completed at the end of each work day.” 306-15 Payment
306-15.1 General
In Item m), substitute “including” for “excluding” in reference to temporary resurfacing.

Add the following paragraphs:
“All temporary and permanent striping, marking and markers, abandoning existing sewer (and laterals) and/or water which includes filling the exposed end of the pipe with a minimum of 2 feet of concrete and ensuring that plug is watertight and capable of withstanding all internal and external pressures without leakage, and Class 200 (DR14) C-900 pipe (as required), and couplers necessary to connect to existing sewer mains.

The contract price paid per lineal foot for “Sanitary Sewer Lateral (Reconnect)” shall include full compensation for furnishing all labor, material, tools, equipment, and incidentals, and for doing all the work involved in replacing a live sanitary sewer lateral, complete in place, including sawcutting existing paving, off-site disposal of concrete and asphalt rubble, existing pipe, trench spoils, excavating, dewatering, two-way lateral cleanout with cast iron traffic lid and precast concrete block (where required), lateral pipe material, backfill and compaction, replacing curb, gutter, and sidewalk; connecting to the sanitary sewer main; and all necessary

APPROVED
Packet Pg. 790 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 90 coordination with City staff, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.” 306-15.9 Temporary Resurfacing
Replace this section with the following:
“Payment for temporary resurfacing shall be considered to be included in the price bid for the various items of work and no additional compensation will be allowed.” SECTION 314 TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT

MARKERS
314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS 314-4.4.1 General
Replace this section with the following paragraphs:
“All traffic striping and pavement markings shall be thermoplastic and Sections 84-1 and 84- 2 of the Caltrans Standard Specifications, latest edition, are hereby made a part of these specifications as though fully contained herein, except that the minimum thickness of traffic stripes and pavement markings shall be as follows:

Traffic Stripes – 90 mil.

Pavement Markings – 120 mil.

When striping trails traffic stripe shall be 3-lineal-feet broken stripe with 9 lineal feet between each stripe.

Unless otherwise directed by the Engineer, all new traffic striping and pavement markings shall be as shown on the drawings. Lane width dimensions shall be from center-to-center of striping.

The Engineer shall have 72 hours to review and approve all cat tracking prior to application of striping and pavement markings.”
314-4.4.5 Measurement
Replace the first paragraph with the following paragraphs:
“Traffic stripes will be measured by the linear foot along the line of the traffic stripe without deduction for gaps in broken traffic stripes. A double traffic stripe, consisting of two 6-inchwide yellow stripes, will be measured as two traffic stripes.

Pavement markings will be measured by the square foot and will include all crosswalk bars, limit lines, arrows, words, and bike lane symbols.

Traffic stripes, pavement markings, and permanent pavement markers shall not be applied to new paved surfaces until a minimum of seven days curing time has elapsed.”

APPROVED
Packet Pg. 791 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 91 314-4.4-6 Payment
Add the following paragraph:
“At work areas consisting only of “Replace Asphalt Concrete Surfacing,” pavement markings and striping shall be replaced as directed by the Engineer. Payment for marking and striping will be in accordance with the bid schedule prices.”

APPROVED
Packet Pg. 792 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 92 PART 4 EXISTING IMPROVEMENTS
SECTION 400PROTECTION AND RESTORATION
400-1 General
Add the following paragraph after the second paragraph:
“The Contractor shall thoroughly inspect the street surface over which his equipment will move and only schedule that equipment and methods which will not cause damage to the existing surface. Repairs made necessary from noncompliance, shall be as directed by the Engineer, and the original appearance of the area shall weigh heavily in determining the extent of the repair.”
Add the following paragraph after the third paragraph:
“When the Contractor is required on private property, the Contractor shall furnish the City of Redding with a signed waiver notice from each of the property owners stating:

I hereby declare that the work performed on my property by the Contractor for the City of Redding has been satisfactorily cleaned up, and that I hereby waive any claim for damages to my property caused by said work.”
SECTION 401 REMOVAL
401-1 General
Add the following paragraphs:
“In the event the Contractor proposes to dispose of concrete, asphalt, or other materials at a site other than an approved landfill, the Contractor shall obtain written permission from the Engineer of the location of the disposal site and provide the City with a completed “Supplement Disposal Site Agreement” included in these specifications.

It shall be the responsibility of the Contractor to remove and dispose of all excess material and concrete rubble from the job site prior to the end of each work day unless otherwise approved by the Engineer.

The cost of removing and disposing of the material from the sites shall be considered as included in the unit prices paid for the work, and no additional compensation will be allowed therefor.”
401-2 Asphalt Concrete Pavement
The second sentence of the first paragraph is amended to read:
“Sawcutting of edges is required when shown on the plans or directed by the Engineer.”

APPROVED
Packet Pg. 793 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 93 SECTION 402 UTILITIES
402-1 Location
402-1.1 General
Replace the last sentence of paragraph 3 with the following:
“The Contractor shall provide the subsurface installation location data to the Engineer ten (10) Working Days prior to any scheduled excavation.”

APPROVED
Packet Pg. 794 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 94 PART 6 TEMPORARY TRAFFIC CONTROL
SECTION 600 ACCESS
600-1 General
Add the following paragraphs after the second paragraph:
“The Contractor shall provide traffic control during all construction survey staking to be performed by City staff.”
“The Contractor shall designate a person whose sole responsibility is to manage the coordination of all traffic control, the traffic control plan, public notification, automobile removal, and other activities necessary to minimize the inconvenience to the public. The Contractor shall provide a sufficient number of workers to assist the designated person with coordination of all traffic control, traffic control plan, public notification, automobile removal, and other activities necessary to minimize the inconvenience to the public. The designated person shall be available to the Engineer, inspectors, and the public for the duration of the contract through the use of a cellular phone. The phone number for the designated person shall be listed on all notifications for coordinating, submitting, making changes to, submitting proposed revisions to, and maintaining the traffic control plan and implementing all traffic control measures.”
SECTION 601TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION AND

MAINTENANCE WORK ZONES
601-2 Temporary Traffic Control Plan (TTCP)
Add the following paragraphs:
“Submittals for TTCP shall be consistent with the City for Redding’s “Guideline for Temporary Traffic Control Plan (TTCP) Development (Engineering Division Forms and Handouts | City of Redding.)
The Contractor shall submit traffic control plans for review, revision, and/or approval by the Engineer. The Contractor shall allow a minimum of five (5) working days for review and shall not begin work until plans are approved. The control measures shall be in conformance with the California Manual of Uniform Traffic Control Devices (CA-MUTCD). The Engineer shall reserve the right to stop any construction activity from proceeding if the work involves traffic detours and/or controls that have not been previously approved or are not in conformance with the approved plan. The Contractor shall not be allowed to claim damages for delay arising from work stoppages by the Engineer in cases involving unauthorized or improper traffic Control regulations.”

APPROVED
Packet Pg. 795 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 95 601-2.2 Payment
Add the following paragraph:

The contract lump sum price paid for “Traffic Control” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in traffic control, complete in place, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.”

APPROVED
Packet Pg. 796 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 96 PART 7 STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS
SECTION 700 MATERIALS
Scope of Work
The work to be performed under this portion of the contract consists of modifying the existing traffic signal control and lighting system with provisions of new controller cabinet, controller assembly, and furnish and installation of bicycle signal, traffic loop detectors, and such other items or details not mentioned above that are required by the plans, Standard Specifications, or the Special Provisions to make a complete and operational system. 700-1 General
Traffic signals and lighting conform to the standard provisions of Division X “Electrical Work” inclusive of Section 86 “General” and Section 87 “Electrical Systems” of the 2022 State of California Department of Transportation Standard Specifications and these special provisions.

Traffic signal work shall be performed at the following location:

Location 1: Market Street and Trinity Street
Cost Break-Down
Cost break-downs shall conform to the provisions in Section 86-1.01C, "Submittals," of the State of California Department of Transportation Standards Specifications and these special provisions.

The Engineer shall be furnished a cost break-down for each contract lump sum item of work described in this section.

The cost break-down shall be submitted to the Engineer for approval within fifteen days after the contract has been approved. The cost break-down shall be approved, in writing, by the Engineer before any partial payment for the items of electrical work will be made.

Equipment List and Drawings
The controller cabinet schematic wiring diagram and intersection sketch shall be combined into one drawing, so that, when the cabinet door is fully open, the drawing is oriented with the intersection.

A maintenance manual shall be furnished for all controller units, auxiliary equipment, and vehicle detector sensor units, control units, and amplifiers. The maintenance manual and operation manual may be combined into one manual. The maintenance manual or combined maintenance and operation manual shall be submitted at the time the controllers are delivered for testing or, if ordered by the Engineer, prior to purchase. The maintenance manual shall include, but need not be limited to, the following items:

APPROVED
Packet Pg. 797 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 97 a. Specifications
b. Design characteristics
c. General operation theory
d. Function of all controls
e. Trouble shooting procedure (diagnostic routine)
f. Block circuit diagram
g. Geographical layout of components
h. Schematic diagrams
I. List of replaceable component parts with stock numbers

TRAFFIC SIGNAL CONSTRUCTION
Maintaining Existing and Temporary Electrical Systems
Traffic signal system shutdowns shall be limited and approved by Public Works Department prior to being permitted. Contractor must submit to the engineer in writing a request for shutdown, inclusive of specific date and time at least 2 days prior to date.

Standards, Steel Pedestals, and Posts
Where the plans refer to the side tenon detail at the end of the signal mast arm, the applicable tip tenon detail may be substituted.

The sign mounting hardware shall be installed at the locations shown on the plans.

Sign panels and sign mounting hardware shall be furnished and installed at the locations shown on the plans by the Contractor. When nonilluminated street name signs are called out on the plans sign mounting hardware for street name signs mounted on signal mast arms shall be supplied by the City. Brackets shall be attached to signal mast arm by strap and saddle bracket method.

Conduit
Conduit to be installed underground shall be Type 3 per Section 86-1.02B of the California Department of Transportation Standard Specifications; unless otherwise specified elsewhere.

Detector termination conduits shall also be Type 3.

Conduit from the standard to the adjacent pull box shall be 2-inch minimum, conduit to all detector loops under curbs shall be 1 ½-inch minimum.

Conduit sizes shown on the plans and specified in the Standard Specifications and these special provisions are referenced to metallic type conduit. When rigid nonmetallic conduit is required or allowed, the normal equivalent industry size shall be used as shown in the following table:

APPROVED
Packet Pg. 798 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 98 Size Designation
for
Metallic Type Conduit
Equivalent Size
for
Rigid Nonmetallic Conduit
21 20
27 25
41 40
53 50
63 65
78 75
103 100
When Type 3 conduit is placed in a trench (not in pavement or under portland cement concrete sidewalk), after the bedding material is placed and the conduit is installed, the trench shall be backfilled with commercial quality concrete, containing not less than 610 lbs of portland cement per cubic yard, to not less than 4 inches above the conduit before additional backfill material is placed.

Conduit runs shown on the plans to be located behind curbs may be installed in the street, within 3 feet of, and parallel with the face of the curb, by the "Trenching in Pavement Method" in conformance with the provisions in Section 87-1.03B(3)(b)(iii), of the California Department of Transportation Standard Specifications. Pull boxes shall be located behind the curb or at the locations shown on the plans.

All conduit to inductive loops shall extend three feet beyond the lip of gutter, AC dike, or edge of asphalt.

After conductors have been installed, the ends of conduits terminating in pull boxes, service equipment enclosures, and controller cabinets shall be sealed with an approved type of sealing compound.

After the conduit is backfilled, it shall be mandrelled with a mandrel sized for the conduit. In addition to the minimum conduit size requirements of Section 87-1.03B(1) of the California Department of Transportation Standard Specifications, the minimum diameter of all conduits shall be 2 inches.

All conduits, new and existing, shall be blown out with compressed air and then sealed for future use.

Conduits terminating in pole bases shall terminate 2 inches below handhole in pole base.

Pull Boxes
All pull boxes shall be No. 6 unless otherwise noted on the plans. All No. 6 pull boxes shall be poly boxes by Quazite Part No. PG1730BA12 or approved equal.

APPROVED
Packet Pg. 799 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 99 Grout shall not be placed in the bottom of the pull boxes, for pull boxes installed in the City of Redding right-of-way. For pull boxes installed in the Caltrans right-of-way, grout pull boxes per Section 87-1.03C(2)(a) of the California Department of Transportation Standard Specifications.

Pull boxes shall be bedded with a 12-inch minimum thickness of clean, crushed rock. The clean, crushed rock shall extend for a minimum of six inches beyond the outside edges of the pull box.

Pull box covers for traffic signals shall be imprinted with "City of Redding Traffic Signal,” for pull boxes in the City of Redding right-of-way. Pull box covers for traffic signals shall be imprinted with “Caltrans Traffic Signal” for pull boxes within the Caltrans right-of-way.

Conductors and Wiring
Conductors and conductor cables shall conform to Section 86-1.02F of the California Department of Transportation Standard Specifications, unless otherwise specified elsewhere.

For electrical work in the City of Redding right-of-way, Splices of conductors shall be insulated with heat-shrink tubing conforming to IAW 86-2.09E of the appropriate size after thoroughly painting the spliced conductors with electrical insulating coating.

For electrical work in the Caltrans right-of-way, use Method B to insulate a splicer per Section 87-

1.03H(2) of the California Department of Transportation Standard Specifications.

Conductors and cables from the terminal compartment through the mast arm to each signal head shall comply with Section 87-1.03F of the California Department of Transportation Standard Specifications.

The minimum insulation thickness, at any point, for Type USE, RHH, or RHW wire shall be 39 mils for conductor sizes No. 14 to No. 10, inclusive, and 51 mils for No. 8 to No. 2, inclusive. The minimum insulation thickness, at any point, for Type THW and TW wires shall be 27 mils for conductor sizes No. 14 to No. 10, inclusive, 40 mils for No. 8, and 52 mils for No. 6 to No. 2, inclusive.

Signal Interconnect Cable
Signal Interconnect Cable (SIC) shall be the 6-pair type. The pairs to be connected are as follows:

TBO-1 Black
Pair
TBO-2 White
TBO-3 Green
Pair
TBO-4 Red

APPROVED
Packet Pg. 800 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 100
Service
Minimum conduit size shall be two inch.

The functional test for each system shall consist of not less than seven days. If unsatisfactory performance of the system develops, the conditions shall be corrected and the test shall be repeated until the seven days of continuous, satisfactory operation is obtained. The functional test for grounds shall be conducted with a 3-point ground tester.

Controller Cabinet and Assembly
Controller Cabinet and assembly shall conform to Section 86-1.02Q of the California Department of Transportation Standard Specifications. Caltrans Department furnishes the controller unit, controller cabinet, and all auxiliary equipment required to operate the system. Also, the Department shall furnish a fully wired and functioning battery backup system including the cabinet.

Contractor shall furnish 4 BBS batteries, C&D model UPS12-300MR.

Signal Faces and Signal Heads
Signal faces, signal heads and auxiliary equipment, as shown on the plans, and the installation thereof, shall conform to Section 86-1.02R, “Signal Heads” of the California Department of Transportation Standard Specifications.

LEDs for vehicular traffic signal units will be Contractor furnished Type MAS mounting shall utilize Pelco bracket assembly number AS-0125 or approved equal, within the City of Redding right-of-way. Mast arm mountings will use tenons for Caltrans poles within the Caltrans right-of-way.

All Signal section housings, visors, backplates, and mounting assemblies shall be metal, painted black inside and out.

Only tunnel visors shall be used. Pipe fittings shall be ductile iron, galvanized steel, or bronze.

Aluminum fittings shall not be used.

Back plates shall be the louvered type and shall have a 2-inch yellow retroreflective strips on the face around the perimeter.

Drain holes, 1/4-inch in diameter, shall be drilled in the bottom of signal heads.

Light Emitting Diode Signal Modules
For traffic signal faces, all sections, including all 12-inch sections, all bicycle sections, all arrow sections, and all pedestrian "Walk" and "Don't Walk" symbols shall utilize light emitting diode (LED) signal modules, as contained on the most current Caltrans Authorized Material List and approved by the Caltrans materials testing laboratory.

Contractor shall install LED lights in all display indications per the Section 86-1.02R(4)(c) of the California Department of Transportation Standard Specifications and special provisions.

APPROVED
Packet Pg. 801 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 101
Pedestrian Signals
Pedestrian signals shall conform to Section 86-1.02S “Pedestrian Signal heads” of Caltrans Standard Specifications. Pedestrian signal face shall be Type A, and shall include the countdown mode.

Pedestrian signals shall have LED countdown pedestrian signal face modules conforming to current Caltrans Specifications. Message symbols for pedestrian signal faces shall be a white WALKING PERSON and Portland orange UPRAISED HAND conforming to the requirements in the Institute of Transportation Engineers Standards: "Pedestrian Traffic Control Signal Indications" and the "Manual on Uniform Traffic Control Devices." Luminaires
Ballasts shall be the lag or lead regulator type.

Photoelectric Controls
Contactors shall be the mechanical armature type.

Photoelectric controls shall be located in the control cabinet.

Detectors
Detectors shall conform to Section 87-1.03V “Detectors” of Caltrans Standard Specifications.

Detector cards will be furnished by Caltrans.

Type D detector loops which are adjacent to limit lines shall have five turns of loop wire and Type A detector loops shall have three turns of loop wire.

Bicycle detector loops shall be 3-foot by 6-foot Modified Type D shown on the plans.

Loop wire shall be Type 2 per Section 86-1.02F(2)(c)(iii) of California Department of Transportation Standard Specifications.

Loop detector lead-in cable shall be Type B per Section 86-1.02F(d)(iii) of California Department of Transportation Standard Specifications.

Slots shall be filled with hot-melt rubberized asphalt sealant.

Slots cut in the pavement shall be washed clean, blown out, and thoroughly dried before installing conductors. Residue resulting from slot cutting operations shall not be permitted to flow across shoulders or lanes occupied by public traffic and shall be removed from the pavement surface.

Residue from slot cutting operations shall be disposed of outside the highway right-of-way in accordance with Greenbook Section 300-1.2 Removal and Disposal of Materials.

APPROVED
Packet Pg. 802 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 102
Pedestrian Push Buttons
Pedestrian push buttons shall be Pelco Intellicross, 2291-PXX, or approved equal. Push button color shall be black. Install the APS cable between the APS and corresponding pedestrian signal.

Attach the accessible pedestrian signal to the standard with screws by drilling and tapping. Drill an 1-inch diameter hole on the standard.

Terminations for the APS cable must be as follows:
4 Conductor Systems
Red 12 VDC
Black Ground
Green Walk
White Don’t Walk
LED Safety Lights
LED safety lights shall be Lumec RFL-105W100LED4K-G2-R2M-UNV-DMG-FAWS-RCD7-GY3, Leotek GCM2-40H-mV-NW-2R-GY-PCR7-WL, or approved equal.

The photocell shall be installed with sensor facing north.

Grey finish (GY3) standard.

Required Features:
• LED Correlated Color Temperature of 4000K.
• Typical Color Rendering Index (CRI) of 75.
• Passive Thermal Management.
• Ambient Operating Temperature Range of -40 Degrees C to +50 Degrees C. • Single Latch, Tool-Less Access to Electrical Compartment with Removable Door (Secured) and Integral Bubble Level.
• Vibration Meets ANSI 136.31-2018 (30, 100K Cycles).
• Minimum Warranty of 10 Years.
• 1-1/4 inches to 2 inches Slipfitter.
• Maximum Effective Projected Area of .92 Square Feet.
• Maximum Weight of 28 LBS.
• 7 Pin ANSI 136.41 Photo Electric Receptacle.
• Voltage Range of 120-277.
• 0-10V Dimmable LED Driver.
• Field Adjustable Wattage Selector (FAWS) with 10 Discrete Steps.

Removing, Reinstalling, or Salvaging Electrical Equipment Salvaged electrical materials shall be hauled to the Caltrans Electrical Maintenance Yard located at 5065 Mountain Lakes Boulevard, phone number 530-225-3062.

APPROVED
Packet Pg. 803 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid 103
The Contractor shall provide the equipment, as necessary, to safely unload and stockpile the material. A minimum of two working days' notice shall be given prior to delivery.

Equipment
All equipment shall be provided by a vendor from the Caltrans Qualified Product List. The following equipment, or approved equal, shall be furnished by the Contractor:

1. Other equipment as required to complete the signal in accordance with the plans and these special provisions.

Payment
The contract unit price paid for "Modify Traffic Signal" shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in furnishing and installing the system, as shown on the plans, as specified in the Standard Specifications, these special provisions, and as directed by the Engineer, including but not limited to any necessary pull boxes, temporary systems, excavation (including removal of existing foundation in conflict with new foundation) and backfill, concrete foundations, conduit of various sizes, cameras, detector loops, traffic signal heads, poles, mast arms, controllers, cabinets, etc., microwave vehicle detection system, restoring sidewalk or pavement and appurtenances damaged or destroyed during construction, salvaging existing materials, and making all required tests.

Full compensation for all additional materials and labor shown on the plans or specified, which are necessary to complete the installation of the various systems, shall be considered as included in the various traffic signal systems, shall be considered as included in the prices paid for the systems, or units thereof, and no additional compensation will be allowed therefor.

Full compensation for hauling and stockpiling electrical materials shall be considered as included in the contract price paid for the item requiring the material to be salvaged and no additional compensation will be allowed therefor.

APPROVED
Packet Pg. 804 Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 805
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 806
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 807
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 808
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 809
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 810
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 811
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 812
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 813
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 814
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 815
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 816
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 817
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 818
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 819
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 820
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 821
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 822
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 823
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 824
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 825
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 826
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 827
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 828
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 829
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 830
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 831
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 832
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 833
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 834
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 835
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 836
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 837
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 838
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 839
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 840
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 841
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 842
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 843
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 844
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 845
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 846
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 847
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 848
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 849
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 850
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 851
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 852
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 853
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 854
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 855
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 856
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 857
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid APPROVED Packet Pg. 858
Attachment: Previous Staff Report - October 2, 2023, item no. 4.11(c)- Award of Trinity Street Bikeway Project (4.11(c)--Project Acceptance, Bid

CITY OF REDDING

REPORT TO THE CITY COUNCIL
Recommendation
Accept Bid Schedule No. 5302 (Job No. 5424-98), City Council Chambers Audio Visual Upgrade Project, awarded to Conti, LLC, as satisfactorily complete, with a final cost of $631,848.54.

Fiscal Impact
Public, Education, and Government Access (PEG) fee revenues funding in the amount of $625,333 and General Fund in the amount of $18,356.92 was approved for this project for Fiscal Year 2023-24. The total project cost, including surveying, design, bidding, construction, field engineering, inspection, and contract administration, is $631,848.54.

Alternative Action
The City Council (Council) may choose to not accept the project as satisfactorily complete and advise staff on how to proceed.

Background/Analysis
Conti, LLC has completed all items of work on the City Council Chambers Audio Visual (AV) Upgrade Project as of May 22, 2025. The project warranty period expires one year from the completion date of May 22, 2025, and the Public Works Department subsequently filed a notice of completion with the County.

At its meeting on December 6, 2022, the Council awarded a construction contract to Conti, LLC of Sacramento, for $456,333 and approved a $46,000 construction contingency fund. Also authorized was $52,000 for contract administration and construction inspection fees and $61,000 for project development costs, and the City Manager was authorized to approve additional increases in either the construction management or construction contingency amounts up to a total of $10,000, for a total authorized amount of $625,333. Project development costs include engineering, environmental, and consultant services.

MEETING DATE: April 7, 2026
ITEM NO. 4.11(d)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(d)--Project Acceptance, Bid Schedule No.5302 , City Council Chambers Audio Visual Upgrade Project
Michael Webb, Public Works
Director/Interim Asst. City
Manager
Packet Pg. 859
Report to Redding City Council April 1, 2026
Re: 4.11(d)--Project Acceptance, Bid Schedule No.5302, City Council Chambers AV Upgrade Project Page 2
On May 8, 2024, a request to transfer the authorized City Manager funds was approved for an increase to the contingency of $6,000 and an increase to contract administration of $4,000 to cover the costs for additional hardware, programming and staff time, due to the increases of cost and contract working days associated with the change order. On February 18, 2025, the Council approved increases to the contingency by $4,690.59 and increases to the contract administration by $13,666.33 to cover the costs for adding wireless connectivity features, video conferencing capabilities and increases in contract working days associated with the change order. These two increases brought the new total authorized amount of the project to $643,689.92. During construction, there were five change orders in the amount of $56,690.59, leaving a balance of $0 in the contingency fund. The final project cost was $631,848.54.

Cost Summary
Awarded Amounts Actual Cost
Project Development Costs $61,000 $61,000
Construction Contract +
Contingency $513,023.59
Construction Contract +
Contract Change Orders $513,023.59
Contract Administration &
Inspection $69,666.33 $57,824.95
Additional City Manager
Authority $0 $0
Total $643,689.92 $631,848.54
The project involved upgrading the existing system with a complete and adequate operating system. The following items were included in the scope of this project: a wireless mic system, individualized monitors, video upgrades – including an upgraded video panel and presentation management technology, a touch panel/control system, a broadcast system, features to enhance virtual meeting capabilities, Community Room upgrades, and a lobby kiosk.

Environmental Review
This action, project acceptance, is not a project as defined by the California Environmental Quality Act. On December 6, 2022, the Council determined that the project is Categorically Exempt from review under the California Environmental Quality Act Guidelines, per Section 15301(a) -Existing Facilities. No further action is required.

Council Priority/City Manager Goals
This agenda item is a routine operational item.

Attachments
Previous Staff Report - December 6, 2022, item no. 4.11(b) Previous Staff Report - February 18, 2025, item no. 4.11(a) - Increase Budget Internal Communication - May 8, 2024, Request for Transfer of Project Funds Packet Pg. 860

CITY OF REDDING

REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following actions relative to Bid Schedule No. 5302 (Job No. 5424-98) City Council Chambers Audio Visual (AV) Upgrade Project:
(1) Award to Conti, LLC, in the amount of $456,333;
(2) Approve an additional $52,000 to cover the cost of administration and inspection fees and $61,000 for project development costs;
(3) Approve $46,000 to provide construction contingency funding; (4) Authorize the City Manager to approve additional increases in either the construction management or construction contingency amounts up to a total of $10,000; (5) Adopt Resolution approving and adopting the 74th Amendment to City Budget Resolution No. 2021-078 appropriating $105,340 in funds for the project; and (6) Find that the project is categorically exempt from review under the California Environmental Quality Act Guidelines, per Section 15301(a) - Existing Facilities.

Fiscal Impact
The City Council Chambers AV Upgrade Project (Project) is being funded by Public, Education, and Government Access (PEG) fee revenues. There is no impact to the General Fund, as any costs absorbed now will be reimbursed by current and future PEG fee revenues.

Cost Summary
Item Amount
Project Development Costs $61,000
Construction Contract + Contingency $502,333
Contract Administration, Inspection, and Testing $52,000 Additional City Manager Authority $10,000
Total Project Costs $625,333
MEETING DATE: December 6, 2022
ITEM NO. 4.11(b)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(b)--Award Bid Schedule No. 5302, Job Order No. 5424-98, City Council Chambers Audio Visual Upgrade Project and Adopt Budget Resolution Chuck Aukland, Public
Works Director
Packet Pg. 861 Attachment: Previous Staff Report - December 6, 2022, item no. 4.11(b) (4.11(d)--Project Acceptance, Bid Schedule No.5302, City Council Report to Redding City Council November 22, 2022
Re: 4.11(b)--Award Bid Schedule No. 5302 City Council Chambers AV Upgrade Project Page 2 Project cost components are estimates and some shifting of the project development and construction contingency funds may be necessary to balance the project within the approved budget.

Alternative Action
The City Council may choose to not award the bid for the Project and provide staff with alternative direction
Background/Analysis
The Project will upgrade the existing system with a complete and adequate operating system.

The following items are included in the scope of this project: a wireless mic system, individualized monitors, video upgrades – to include an upgraded video panel and presentation management technology, a touch panel/control system, a broadcast system, features to enhance virtual meeting capabilities, Community Room upgrades, and a lobby kiosk.

Attached is a tabulation of bids received and opened on October 25, 2022, for the Project. The one bid in the amount of $456,333 was received from Conti, LLC, of Sacramento, California.

The engineer's estimate was $332,000. Total project development costs for this project are estimated to be $61,000 including staff, engineering, and consultant services costs. Construction contract administration and inspection costs for this project are estimated to be $52,000.

Environmental Review
Staff has reviewed the project and determined that the project is Categorically Exempt from review under the California Environmental Quality Act Guidelines, per Section 15301(a) - Existing Facilities. Class 1 exemptions include minor alteration of existing public facilities and equipment. The project will require modification of the existing system and installation of new equipment. The upgraded audiovisual system will enhance communication, and make meetings more accessible for public meeting attendees. The updated equipment will be installed within the existing public facility and the project will not result in expansion of use. The action area does not have significant values for wildlife habitat or other environmental resources and the project has no potential to have a significant effect on the environment.

Council Priority/City Manager Goals
• This agenda item is a routine operational item.

Attachments
^Resolution
^Bid Tabulation
^Location Map
^Notice of Exemption
Packet Pg. 862 Attachment: Previous Staff Report - December 6, 2022, item no. 4.11(b) (4.11(d)--Project Acceptance, Bid Schedule No.5302, City Council RESOLUTION NO. 2022-___

A RESOLUTION OF THE CITY OF REDDING APPROVING AND ADOPTING THE 74 TH AMENDMENT TO CITY BUDGET RESOLUTION NO. 2021-078
APPROPRIATING $105,340 TO INCREASE FUNDING FOR THE COUNCIL CHAMBER UPGRADES PROJECT FOR FISCAL YEAR 2022-23

BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDDING THAT Budget Resolution No. 2021-078 be and is hereby amended as follows:

FUND DIVISION DESCRIPTION INCREASE DECREASE
111 427 Non-Departmental $105,340
THAT account titles and numbers requiring adjustments by this Resolution are as follows:

USE SOURCE

OF FUNDS OF FUNDS
Decrease (Increase) Beginning Balance
111-427-01-0001-01 Beginning Balance $ 105,340
Increase Expenditures
111-427-4663-07 Council Chamber Upgrades $105,340
Total $ 105,340 $ 105,340
THAT the purpose is to appropriate $105,340 to increase funding for the council chambers upgrade project for fiscal year 2022-23.

I HEREBY CERTIFY that the foregoing resolution was introduced at a regular meeting of the City Council of the City of Redding on the 6th day of December, 2022, and was duly adopted at said meeting by the following vote:

AYES: COUNCIL MEMBERS:

NOES: COUNCIL MEMBERS:

ABSENT: COUNCIL MEMBERS:

ABSTAIN: COUNCIL MEMBERS:
, Mayor
ATTEST: FORM APPROVAL:

PAMELA MIZE, City Clerk BARRY E. DeWALT, City Attorney
Packet Pg. 863 Attachment: Previous Staff Report - December 6, 2022, item no. 4.11(b) (4.11(d)--Project Acceptance, Bid Schedule No.5302, City Council BID TABULATION FOR:

CITY COUNCIL CHAMBERS AV UPGRADE PROJECT
ENGINEER'S EST Conti LLC
10/25/2022 UNIT UNIT UNIT UNIT

ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 Audiovisual System
Upgrade LS 1 $332,000.00 $332,000.00 $456,333.00 $456,333.00 TOTAL - CONTRACT ITEMS $332,000.00 $456,333.00
Bid Schedule No.: 5302
Packet Pg. 864 Attachment: Previous Staff Report - December 6, 2022, item no. 4.11(b) (4.11(d)--Project Acceptance, Bid Packet Pg. 865 Attachment: Previous Staff Report - December 6, 2022, item no. 4.11(b) (4.11(d)--Project Acceptance, Bid Schedule No.5302, City Council Packet Pg. 866
Attachment: Previous Staff Report - December 6, 2022, item no. 4.11(b) (4.11(d)--Project Acceptance, Bid Schedule No.5302, City Council

CITY OF REDDING

REPORT TO THE CITY COUNCIL
Recommendation
Authorize and approve increases to the project budget in the amount of $18,356.92 for the completion of Bid Schedule No. 5302 (Job No. 5424-98), City Council Chambers Audio Visual Upgrade Project as outlined below for additional improvements:
(1) Increase of $13,666.33 to the construction management budget, bringing the construction management total to $69,666.33; and
(2) Increase of $4,690.59 to the construction contingency budget, bringing the construction contingency budget to $56,690.59.

Fiscal Impact
The City Council Chambers Audio Visual (AV) Upgrade Project (Project) is being funded by Public, Education, and Government Access (PEG) fee revenues. The current revenues from PEG fall short of the total project budget and the General Fund is covering the current expense. It is estimated that the General Fund will be fully reimbursed by spring of 2026. The $18,356.92 cost increase to the project is covered by budgeted funds. The total project cost, including the proposed increase, is expected to be $643,689.92.

Alternative Action
The City Council (Council) may choose not to approve the request and provide alternative direction to staff.

Background/Analysis
On December 6, 2022, the Council awarded the construction contract for the project to Conti, LLC. The project consists of upgrading the existing system with a complete and adequate operating system. The project includes: a wireless mic system, individual monitors, video upgrades – to include an upgraded video panel and presentation management technology, a touch panel/control system, a broadcast system, features to enhance virtual meeting capabilities, Community Room upgrades, and a lobby kiosk.

MEETING DATE: February 18, 2025
ITEM NO. 4.11(a)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(a)--Approve Increase to Project Budget for Council Chambers Audio Visual Upgrades Project
Michael Webb, Public Works
Director

APPROVED
Packet Pg. 867 Attachment: Previous Staff Report - February 18, 2025, item no. 4.11(a) - Increase Budget (4.11(d)--Project Acceptance, Bid Schedule No.5302, Report to Redding City Council February 11, 2025
Re: 4.11(a)--Approve Increase to Project Budget for Council Chambers Audio Visual Upgrades Project Page 2
During the course of construction, conditions in the field warranted changes to meet the project intent and functionality needs. These changes include additional wireless connectivity to the video system in both the Council Chambers and the Community Room, additional control and video conferencing capabilities in the Community Room, as well as, work performed by the Building Maintenance Division to facilitate the new video wall. These changes and others have exhausted much of the contingency funds and construction management funds originally awarded for the project. The City Manager funds were allocated to the construction management and contingency funds on May 8, 2024.

The additional work will cause the project budget to exceed the awarded amount. An additional $18,356.92 is requested to cover the construction contingency ($4,690.59) and construction management ($13,666.33) project components.

COST SUMMARY
Item Awarded Amount Projected Amount Increase
Contract Administration,
Inspection, Testing
$56,000 $69,666.33 $13,666.33
Construction Contingency $52,000 $56,690.59 $4,690.59
Environmental Review
On December 6, 2022, the Council determined that the project is categorically exempt from review under the California Environmental Quality Act, pursuant to Section 15301(a) - Existing Facilities. No further action is required.

Council Priority/City Manager Goals
This agenda item is a routine operational item.

Attachments
Previous Staff Report 120622
Transfer of Project Funds - May 8, 2024, Internal Communication

APPROVED
Packet Pg. 868 Attachment: Previous Staff Report - February 18, 2025, item no. 4.11(a) - Increase Budget (4.11(d)--Project Acceptance, Bid Schedule No.5302,

CITY OF REDDING

REPORT TO THE CITY COUNCIL
Recommendation
Authorize the following actions relative to Bid Schedule No. 5302 (Job No. 5424-98) City Council Chambers Audio Visual (AV) Upgrade Project:
(1) Award to Conti, LLC, in the amount of $456,333;
(2) Approve an additional $52,000 to cover the cost of administration and inspection fees and $61,000 for project development costs;
(3) Approve $46,000 to provide construction contingency funding; (4) Authorize the City Manager to approve additional increases in either the construction management or construction contingency amounts up to a total of $10,000; (5) Adopt Resolution approving and adopting the 74th Amendment to City Budget Resolution No. 2021-078 appropriating $105,340 in funds for the project; and (6) Find that the project is categorically exempt from review under the California Environmental Quality Act Guidelines, per Section 15301(a) - Existing Facilities.

Fiscal Impact
The City Council Chambers AV Upgrade Project (Project) is being funded by Public, Education, and Government Access (PEG) fee revenues. There is no impact to the General Fund, as any costs absorbed now will be reimbursed by current and future PEG fee revenues.

Cost Summary
Item Amount
Project Development Costs $61,000
Construction Contract + Contingency $502,333
Contract Administration, Inspection, and Testing $52,000 Additional City Manager Authority $10,000
Total Project Costs $625,333
MEETING DATE: December 6, 2022
ITEM NO. 4.11(b)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(b)--Award Bid Schedule No. 5302, Job Order No. 5424-98, City Council Chambers Audio Visual Upgrade Project and Adopt Budget Resolution Chuck Aukland, Public
Works Director

APPROVED
Packet Pg. 869 Attachment: Previous Staff Report - February 18, 2025, item no. 4.11(a) - Increase Budget (4.11(d)--Project Acceptance, Bid Schedule No.5302, Report to Redding City Council November 22, 2022
Re: 4.11(b)--Award Bid Schedule No. 5302 City Council Chambers AV Upgrade Project Page 2 Project cost components are estimates and some shifting of the project development and construction contingency funds may be necessary to balance the project within the approved budget.

Alternative Action
The City Council may choose to not award the bid for the Project and provide staff with alternative direction
Background/Analysis
The Project will upgrade the existing system with a complete and adequate operating system.

The following items are included in the scope of this project: a wireless mic system, individualized monitors, video upgrades – to include an upgraded video panel and presentation management technology, a touch panel/control system, a broadcast system, features to enhance virtual meeting capabilities, Community Room upgrades, and a lobby kiosk.

Attached is a tabulation of bids received and opened on October 25, 2022, for the Project. The one bid in the amount of $456,333 was received from Conti, LLC, of Sacramento, California.

The engineer's estimate was $332,000. Total project development costs for this project are estimated to be $61,000 including staff, engineering, and consultant services costs. Construction contract administration and inspection costs for this project are estimated to be $52,000.

Environmental Review
Staff has reviewed the project and determined that the project is Categorically Exempt from review under the California Environmental Quality Act Guidelines, per Section 15301(a) - Existing Facilities. Class 1 exemptions include minor alteration of existing public facilities and equipment. The project will require modification of the existing system and installation of new equipment. The upgraded audiovisual system will enhance communication, and make meetings more accessible for public meeting attendees. The updated equipment will be installed within the existing public facility and the project will not result in expansion of use. The action area does not have significant values for wildlife habitat or other environmental resources and the project has no potential to have a significant effect on the environment.

Council Priority/City Manager Goals
• This agenda item is a routine operational item.

Attachments
^Resolution
^Bid Tabulation
^Location Map
^Notice of Exemption

APPROVED
Packet Pg. 870 Attachment: Previous Staff Report - February 18, 2025, item no. 4.11(a) - Increase Budget (4.11(d)--Project Acceptance, Bid Schedule No.5302, RESOLUTION NO. 2022-___

A RESOLUTION OF THE CITY OF REDDING APPROVING AND ADOPTING THE 74 TH AMENDMENT TO CITY BUDGET RESOLUTION NO. 2021-078
APPROPRIATING $105,340 TO INCREASE FUNDING FOR THE COUNCIL CHAMBER UPGRADES PROJECT FOR FISCAL YEAR 2022-23

BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDDING THAT Budget Resolution No. 2021-078 be and is hereby amended as follows:

FUND DIVISION DESCRIPTION INCREASE DECREASE
111 427 Non-Departmental $105,340
THAT account titles and numbers requiring adjustments by this Resolution are as follows:

USE SOURCE

OF FUNDS OF FUNDS
Decrease (Increase) Beginning Balance
111-427-01-0001-01 Beginning Balance $ 105,340
Increase Expenditures
111-427-4663-07 Council Chamber Upgrades $105,340
Total $ 105,340 $ 105,340
THAT the purpose is to appropriate $105,340 to increase funding for the council chambers upgrade project for fiscal year 2022-23.

I HEREBY CERTIFY that the foregoing resolution was introduced at a regular meeting of the City Council of the City of Redding on the 6th day of December, 2022, and was duly adopted at said meeting by the following vote:

AYES: COUNCIL MEMBERS:

NOES: COUNCIL MEMBERS:

ABSENT: COUNCIL MEMBERS:

ABSTAIN: COUNCIL MEMBERS:
, Mayor
ATTEST: FORM APPROVAL:

PAMELA MIZE, City Clerk BARRY E. DeWALT, City Attorney

APPROVED
Packet Pg. 871 Attachment: Previous Staff Report - February 18, 2025, item no. 4.11(a) - Increase Budget (4.11(d)--Project Acceptance, Bid Schedule No.5302, BID TABULATION FOR:

CITY COUNCIL CHAMBERS AV UPGRADE PROJECT
ENGINEER'S EST Conti LLC
10/25/2022 UNIT UNIT UNIT UNIT

ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 Audiovisual System
Upgrade LS 1 $332,000.00 $332,000.00 $456,333.00 $456,333.00 TOTAL - CONTRACT ITEMS $332,000.00 $456,333.00
Bid Schedule No.: 5302

APPROVED
Packet Pg. 872 Attachment: Previous Staff Report - February 18, 2025, item no. 4.11(a) - Increase Budget (4.11(d)--Project

APPROVED
Packet Pg. 873 Attachment: Previous Staff Report - February 18, 2025, item no. 4.11(a) - Increase Budget (4.11(d)--Project Acceptance, Bid Schedule No.5302, APPROVED Packet Pg. 874
Attachment: Previous Staff Report - February 18, 2025, item no. 4.11(a) - Increase Budget (4.11(d)--Project Acceptance, Bid Schedule No.5302, APPROVED Packet Pg. 875
Attachment: Previous Staff Report - February 18, 2025, item no. 4.11(a) - Increase Budget (4.11(d)--Project Acceptance, Bid Schedule No.5302, Packet Pg. 876
Attachment: Internal Communication - May 8, 2024, Request for Transfer of Project Funds (4.11(d)--Project Acceptance, Bid Schedule No.5302,

CITY OF REDDING

REPORT TO THE CITY COUNCIL
Recommendation
Authorize and approve the following actions relative to Bid Negotiation No. 5523, Water Main 2024 Improvement Project:
(1) Increase of $25,000 to the construction management budget, bringing the construction management total to $443,000; and
(2) Increase of $475,000 to the construction contingency budget bringing the construction contingency total to $1,175,000.

Fiscal Impact
The Water Main 2024 Improvement Project (Project) is funded by the Public Works’ Water Utility Division. Public Works’ Water Utility has adequate funding within the current Water Main Replacement Account as previously appropriated by City Council (Council) as part of the Fiscal Year 2025-26 budget to adequately cover the $500,000 increase. Once approved, staff will process an appropriation transfer to document the transfer of funds from the Water Main Replacement Account to the Project. The Project costs, including the proposed increase, will be $5,567,521.

Cost Summary1
Item Authorized Amount3Increase Amount Revised Amount
Project Development Costs $521 $0 $521
Contract Administration,
Inspection, Testing
$418 $25 $443
Construction Contract $3,378 $0 $3,378
Construction Contingency $700 $475 $1,175
Additional City Manager
Authority2
$50 $0 $50
Total Project Costs $5,067 $500 $5,567
Total Project Budget $5,100 -- $5,600
MEETING DATE: April 7, 2026
ITEM NO. 4.11(e)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(e)--Approve Increase to Project Budget for the Water Main 2024 Improvements Project
Michael Webb, Public Works
Director/Interim Asst. City
Manager
Packet Pg. 877
Report to Redding City Council April 1, 2026
Re: 4.11(e)--Increase to Project Budget for Water Main 2024 Improvement Project Page 2 Notes:
1All amounts are rounded to the nearest $1,000.
2Additional City Manager Authority, $50,000, was transferred to Construction Contingency on September 25, 2025.
3Authorized Amounts were previously increased from the awarded amounts by a total $400,000 at the October 21, 2025 Council Meeting.

Alternative Action
Council may choose not to approve the request and provide alternative direction to staff.

Without additional funding, the project scope will be reduced, leading to a greater potential for increased maintenance costs for the unfinished portions of the distribution system, decreased reliability of the distribution system, and increased risk of water main breaks creating significant issues for the City of Redding (City) and its customers.

Background/Analysis
On November 5, 2024, the Council awarded the construction contract for the project to Cox & Cox Construction, Inc. The notice to proceed was issued February 28, 2025, but due to concerns with the weather, the project was suspended until later in the spring when rainy weather would be less likely to affect construction progress.

The project plans identified specific areas requiring rock excavation. However, during subsequent potholing operations, additional areas requiring rock excavation were discovered.

This resulted in quantity overruns for the bid items that included rock excavation; the most significant being a four-fold increase to the watermain installation with the rock excavation item, and a five-fold increase to the service connection with the rock excavation item. Even though there were quantity reductions for the corresponding bid items without rock excavation, the offset was insufficient to cover the added costs.

In addition to quantity overruns, there was an issue locating and connecting to the existing watermain adjacent to Highway 299. The plans showed the existing watermain about 6 feet below the ground surface. Ultimately, finding the existing main involved coordination with the water department, using the services of a utility locating company, excavating multiple possible locations, excavating to a depth of about 14 feet. Due to the proximity of Highway 299 and worker safety concerns, heavy duty shoring had to be utilized to minimize the size of the excavation and prevent it from collapsing. A dewatering system was also necessary to keep the excavation dry so the new main could be connected to the existing main.

The additional work attributed to differing existing conditions and contract item overruns caused the project budget to exceed the awarded amount. An additional $500,000 is requested to cover anticipated increases to the construction contingency ($475,000) and construction management ($25,000) project components.

Environmental Review
This action, budget modification, is not a project as defined by the California Environmental Quality Act (CEQA), and no further action is required. On November 5, 2025, Council determined that the Water Main 2024 Improvement Project is categorically exempt from review Packet Pg. 878
Report to Redding City Council April 1, 2026
Re: 4.11(e)--Increase to Project Budget for Water Main 2024 Improvement Project Page 3 under CEQA, pursuant to Section 15301 - Existing Facilities, 15302 - Replacement or Reconstruction, and 15305 - Minor Alterations in Land Use Limitations.

Council Priority/City Manager Goals
• This agenda item is a routine operational item.

Attachments
092525 Transfer of Project funds
Previous Staff Report - November 5, 2024, item no. 4.11(f)-Award BN 5523 Previous Staff Report - October 21, 2025, item no. 4.11(c) - Approve Increase to Project Budget for the Water Main 2024 Improvements Project
Packet Pg. 879
Packet Pg. 880
Attachment: 092525 Transfer of Project funds (4.11(e)--Increase to Project Budget for Water Main 2024 Improvement Project)

CITY OF REDDING

REPORT TO THE CITY COUNCIL
Recommendation
Authorize and approve the following actions relative to Bid Negotiation No. 5523 (Job Order No. 2681), Water Main 2024 Improvement Project:
(1) Award to Cox & Cox Construction, Inc., in the amount of $3,378,220.50; (2) Approve an additional $380,000 to cover the cost of administration and inspection fees; (3) Approve $521,300 for project development costs;
(4) Approve $338,000 to provide construction contingency funding; (5) Authorize the City Manager to approve additional increases in either the construction management or construction contingency amounts up to a total of $50,000; and (6) Find that the Project is categorically exempt from review under the California Environmental Quality Act, pursuant to Section 15301 - Existing Facilities, 15302- Replacement or Reconstruction, and 15305 – Minor Alterations in Land Use Limitations.

Fiscal Impact
The Water Main 2024 Improvement Project (Project) is being funded by Public Works’ Water Utility Division. This project was included in the Water Utility Master Capital Plan and budget accordingly – funding this project will not impact other activities or projects.

Cost Summary
Item Estimated
Project Development Costs $521,300
Construction Contract + Contingency $3,716,221
Contract Administration, Inspection, Testing $380,000
Additional City Manager Authority $50,000
Total Project Costs $4,667,521
Total Project Budget $4,700,000
MEETING DATE: November 5, 2024
ITEM NO. 4.11(f)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(f)--Award Bid Negotiation No. 5523 (Job Order No. 2681) Water Main 2024 Improvement Project
Michael Webb, Public Works
Director

APPROVED
Packet Pg. 881 Attachment: Previous Staff Report - November 5, 2024, item no. 4.11(f)-Award BN 5523 (4.11(e)--Increase to Project Budget for Water Main 2024 Report to Redding City Council October 31, 2024
Re: 4.11(f)--Award Water Main 2024 Improvement Project Page 2 Project cost components are estimates and some shifting of the project development, construction management, and construction contingency funds may be necessary to balance the project within the approved budget.

Alternative Action
City Council may choose not to award the bid for the project and provide staff with alternate direction. Without this project, there is greater potential for increased maintenance costs, a decrease in reliability and an increased risk of water main breaks for the City of Redding (City) customers.

Background/Analysis
The City's water system includes approximately 2.98 million feet (565 miles) of conveyance and distribution pipelines of various pipe materials and sizes ranging from 1-inch to 48-inch.

Assessments of the City’s water distribution system indicate that the older steel, asbestos and cast-iron pipelines have had the highest rates of failure in recent years. To reduce pipeline failures and maintenance costs and to improve reliability to its customers, the Water Utility has focused on replacing older steel, cast-iron and asbestos piping in areas where breaks have occurred. This project will replace over 11,000 feet of aging steel, asbestos and cast-iron water mains, 85 water services, 18 fire hydrants and acquire any necessary easements. These mains have reached the end of their service life and have had several breaks in recent years that the Water Utility has repaired. This project will replace the old piping with new polyvinyl chloride (PVC) and ductile iron piping to reduce future maintenance and provide reliable service in these areas for the foreseeable future.

Attached is a tabulation of bids received and opened on October 17, 2024, for construction of the project. The low bid in the amount of $3,378,220.50 was received from Cox & Cox Construction, Inc., of Redding, California. The engineer's estimate was $3,114,025. Total project development costs for this project are estimated to be $521,300. Project development costs include engineering, surveying, right-of-way, environmental, and consultant services for the project.

Environmental Review
Staff has determined that the project is categorically exempt from environmental review under California Environmental Quality Act Guidelines, pursuant to Sections 15301 - Existing Facilities, 15302 – Replacement or Reconstruction, and 15305 – Minor Alterations in Land Use Limitations. Class 1 exemptions include the minor alteration of existing public structures and facilities. Class 2 exemptions consists of replacement or reconstruction where the new structure will be located on the same site and will have substantially the same purpose and capacity. Class 5 exemptions consist of minor alterations in land use limitations, which do not result in any changes in land use or density. The existing utilities will be replaced to provide reliable service that meets public health and safety standards. The project will be located in the right-of-way and will result in a negligible expansion of use. The action area does not have significant values for wildlife habitat or other environmental resources and the project has no potential to have a significant effect on the environment.

Council Priority/City Manager Goals
• This agenda item is a routine operational item.

APPROVED
Packet Pg. 882 Attachment: Previous Staff Report - November 5, 2024, item no. 4.11(f)-Award BN 5523 (4.11(e)--Increase to Project Budget for Water Main 2024 Report to Redding City Council October 31, 2024
Re: 4.11(f)--Award Water Main 2024 Improvement Project Page 3 Attachments
^Location Map
^Notice of Exemption
^Bid Tab

APPROVED
Packet Pg. 883 Attachment: Previous Staff Report - November 5, 2024, item no. 4.11(f)-Award BN 5523 (4.11(e)--Increase to Project Budget for Water Main 2024

CITY OF REDDING

LOCATION MAP

EXHIBIT A

WATER MAIN IMPROVEMENT
PROJECT 2024 PUBLIC WORKS

DEPARTMENT S MARKET ST WILDWOOD LN

OLD OASIS RD ALEE LN DAUT RD

OASIS RD
EUREKA WAY \ HWY 299 THELMA LN THERESA LN

GEARY ST

SUTTER ST

ELLIS ST

GRANGE ST

VEDA ST

APPROVED
Packet Pg. 884 Attachment: Previous Staff Report - November 5, 2024, item no. 4.11(f)-Award BN 5523 (4.11(e)--Increase to Project Budget for Water Main 2024 APPROVED Packet Pg. 885
Attachment: Previous Staff Report - November 5, 2024, item no. 4.11(f)-Award BN 5523 (4.11(e)--Increase to Project Budget for Water Main 2024 Shaded areas indicate corrections made in accordance with the Special Provisions. Page 1 of 3 BID TABULATION FOR:

WATER MAIN 2024 IMPROVEMENT PROJECT
Bid Schedule No.: 5523
ENGINEER'S EST Cox & Cox Construction, Inc Allen Gill Construction, Inc. 10/17/2024 UNIT UNIT UNIT

ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 Prepare Storm Water Pollution Prevention
Plan
LS 1 $5,000.00 $5,000.00 $2,596.00 $2,596.00 $9,186.00 $9,186.00 2 Implement Storm Water Pollution
Prevention Plan
LS 1 $18,000.00 $18,000.00 $25,959.00 $25,959.00 $33,482.00 $33,482.00 3 Construction Area Signs EA 28 $250.00 $7,000.00 $347.50 $9,730.00 $491.00 $13,748.00 4 Traffic Control LS 1 $100,000.00 $100,000.00 $203,337.00 $203,337.00 $216,401.00 $216,401.00 5 Trench Sheeting and Shoring LS 1 $20,000.00 $20,000.00 $97,613.00 $97,613.00 $88,083.00 $88,083.00 6 Water Main (6" PVC) LF 331 $145.00 $47,995.00 $314.00 $103,934.00 $448.00 $148,288.00 7 Water Main (8" PVC) LF 4010 $150.00 $601,500.00 $147.50 $591,475.00 $155.00 $621,550.00 8 Water Main (8" DIP) LF 3307 $160.00 $529,120.00 $164.50 $544,001.50 $136.00 $449,752.00 9 Water Main (8" DIP, Rock Excavation) LF 1343 $270.00 $362,610.00 $198.50 $266,585.50 $187.00 $251,141.00 10 Water Main (12" DIP) LF 2300 $280.00 $644,000.00 $316.50 $727,950.00 $324.00 $745,200.00 11 Valve (2" Gate) EA 3 $2,000.00 $6,000.00 $1,670.00 $5,010.00 $1,413.00 $4,239.00 12 Valve (4" Gate) EA 1 $2,300.00 $2,300.00 $2,903.00 $2,903.00 $2,031.00 $2,031.00 13 Valve (6" Gate) EA 7 $2,500.00 $17,500.00 $3,212.00 $22,484.00 $2,019.00 $14,133.00 14 Valve (8" Gate) EA 26 $3,000.00 $78,000.00 $3,731.75 $97,025.50 $2,680.00 $69,680.00 15 Valve (12" Butterfly) EA 11 $6,000.00 $66,000.00 $4,751.00 $52,261.00 $3,806.00 $41,866.00 16 Valve (2" Blowoff) EA 1 $3,500.00 $3,500.00 $3,200.00 $3,200.00 $6,779.00 $6,779.00 17 Fire Hydrant Assembly EA 15 $14,000.00 $210,000.00 $12,242.00 $183,630.00 $15,462.00 $231,930.00 18 Fire Hydrant Assembly (Rock Excavation) EA 3 $16,000.00 $48,000.00 $15,140.00 $45,420.00 $15,693.00 $47,079.00 19 Reconnect Water Service (1") EA 75 $3,500.00 $262,500.00 $2,978.00 $223,350.00 $5,893.00 $441,975.00 20 Reconnect Water Service (1", Rock
Excavation)
EA 8 $5,000.00 $40,000.00 $5,718.00 $45,744.00 $6,322.00 $50,576.00 21 Reconnect Water Service (2") EA 2 $5,000.00 $10,000.00 $10,252.00 $20,504.00 $13,677.00 $27,354.00 22 Relocate Water Meter EA 8 $1,000.00 $8,000.00 $3,468.00 $27,744.00 $5,110.00 $40,880.00 23 Abandon Valve EA 20 $550.00 $11,000.00 $1,387.00 $27,740.00 $665.00 $13,300.00 24 Remove Valve EA 16 $750.00 $12,000.00 $1,934.00 $30,944.00 $479.00 $7,664.00 25 Remove Fire Hydrant EA 5 $800.00 $4,000.00 $3,416.00 $17,080.00 $1,534.00 $7,670.00 TOTAL - CONTRACT ITEMS $3,114,025.00 $3,378,220.50 $3,583,987.00

APPROVED
Packet Pg. 886 Attachment: Previous Staff Report - November 5, 2024, item no. 4.11(f)-Award BN 5523 (4.11(e)--Increase Shaded areas indicate corrections made in accordance with the Special Provisions. Page 2 of 3 Site Work Solutions
Eddie Axner Construction,
Inc. SnL Group, Inc.

UNIT UNIT UNIT

PRICE TOTAL PRICE TOTAL PRICE TOTAL
$2,440.36 $2,440.36 $4,000.00 $4,000.00 $15,000.00 $15,000.00 $5,161.59 $5,161.59 $21,415.07 $21,415.07 $5,000.00 $5,000.00 $415.58 $11,636.24 $330.00 $9,240.00 $335.00 $9,380.00
$154,180.37 $154,180.37 $196,325.09 $196,325.09 $85,000.00 $85,000.00 $6,296.57 $6,296.57 $29,000.00 $29,000.00 $5,000.00 $5,000.00 $221.58 $73,342.98 $496.41 $164,311.71 $185.00 $61,235.00 $160.86 $645,048.60 $130.04 $521,460.40 $170.00 $681,700.00 $177.88 $588,249.16 $151.34 $500,481.38 $175.00 $578,725.00 $207.16 $278,215.88 $301.99 $405,572.57 $190.00 $255,170.00 $393.02 $903,946.00 $285.92 $657,616.00 $325.00 $747,500.00 $1,207.84 $3,623.52 $1,972.50 $5,917.50 $3,000.00 $9,000.00 $2,162.08 $2,162.08 $2,021.10 $2,021.10 $3,400.00 $3,400.00 $3,307.47 $23,152.29 $2,795.96 $19,571.72 $3,900.00 $27,300.00 $4,083.68 $106,175.68 $2,907.40 $75,592.40 $4,400.00 $114,400.00 $5,617.96 $61,797.56 $4,372.76 $48,100.36 $5,783.00 $63,613.00 $4,246.52 $4,246.52 $2,441.71 $2,441.71 $10,000.00 $10,000.00 $14,099.46 $211,491.90 $14,070.89 $211,063.35 $14,400.00 $216,000.00 $15,818.11 $47,454.33 $21,974.00 $65,922.00 $20,000.00 $60,000.00 $5,865.10 $439,882.50 $8,123.00 $609,225.00 $6,885.00 $516,375.00 $5,725.19 $45,801.52 $8,640.43 $69,123.44 $12,000.00 $96,000.00 $9,943.59 $19,887.18 $16,781.70 $33,563.40 $15,000.00 $30,000.00 $2,532.20 $20,257.60 $5,289.08 $42,312.64 $9,800.00 $78,400.00 $814.55 $16,291.00 $1,343.00 $26,860.00 $1,250.00 $25,000.00 $926.94 $14,831.04 $1,256.03 $20,096.48 $2,300.00 $36,800.00 $1,607.44 $8,037.20 $1,335.10 $6,675.50 $5,000.00 $25,000.00 $3,693,609.67 $3,747,908.82 $3,754,998.00
BID TABULATION FOR:

WATER MAIN 2024 IMPROVEMENT PROJECT
Bid Schedule No.: 5523
10/17/2024

ITEM DESCRIPTION UNIT QTY
1 Prepare Storm Water Pollution Prevention
Plan
LS 1
2 Implement Storm Water Pollution
Prevention Plan
LS 1
3 Construction Area Signs EA 28
4 Traffic Control LS 1
5 Trench Sheeting and Shoring LS 1
6 Water Main (6" PVC) LF 331
7 Water Main (8" PVC) LF 4010
8 Water Main (8" DIP) LF 3307
9 Water Main (8" DIP, Rock Excavation) LF 1343
10 Water Main (12" DIP) LF 2300
11 Valve (2" Gate) EA 3
12 Valve (4" Gate) EA 1
13 Valve (6" Gate) EA 7
14 Valve (8" Gate) EA 26
15 Valve (12" Butterfly) EA 11
16 Valve (2" Blowoff) EA 1
17 Fire Hydrant Assembly EA 15
18 Fire Hydrant Assembly (Rock Excavation) EA 3
19 Reconnect Water Service (1") EA 75
20 Reconnect Water Service (1", Rock
Excavation)
EA 8
21 Reconnect Water Service (2") EA 2
22 Relocate Water Meter EA 8
23 Abandon Valve EA 20
24 Remove Valve EA 16
25 Remove Fire Hydrant EA 5

TOTAL - CONTRACT ITEMS

APPROVED
Packet Pg. 887 Attachment: Previous Staff Report - November 5, 2024, item no. 4.11(f)-Award BN 5523 (4.11(e)--Increase Shaded areas indicate corrections made in accordance with the Special Provisions. Page 3 of 3 Stimpel-Wiebelhaus
Associated, Inc AVERAGE

UNIT BID

PRICE TOTAL TOTAL
$2,500.00 $2,500.00 $5,953.73
$20,000.00 $20,000.00 $18,502.94
$415.00 $11,620.00 $389.01
$400,000.00 $400,000.00 $209,207.24
$20,000.00 $20,000.00 $40,998.76
$330.00 $109,230.00 $332.50
$170.00 $681,700.00 $155.57
$185.00 $611,795.00 $164.95
$265.00 $355,895.00 $224.94
$240.00 $552,000.00 $314.07
$3,335.00 $10,005.00 $2,099.72
$3,710.00 $3,710.00 $2,704.53
$3,980.00 $27,860.00 $3,202.41
$5,075.00 $131,950.00 $3,812.97
$5,700.00 $62,700.00 $5,005.12
$4,330.00 $4,330.00 $5,166.21
$20,500.00 $307,500.00 $15,129.06
$23,500.00 $70,500.00 $18,687.52
$3,700.00 $277,500.00 $5,574.02
$4,500.00 $36,000.00 $7,150.94
$7,075.00 $14,150.00 $12,121.55
$4,000.00 $32,000.00 $5,033.21
$325.00 $6,500.00 $964.09
$645.00 $10,320.00 $1,256.83
$1,300.00 $6,500.00 $2,365.42

AVERAGE BID
$3,766,265.00 $3,654,164.83
BID TABULATION FOR:

WATER MAIN 2024 IMPROVEMENT PROJECT
Bid Schedule No.: 5523
10/17/2024
ITEM DESCRIPTION UNIT QTY 1 Prepare Storm Water Pollution Prevention Plan
LS1
2 Implement Storm Water Pollution
Prevention Plan
LS1
3 Construction Area Signs EA 28 4 Traffic Control LS 1 5 Trench Sheeting and Shoring LS 1 6 Water Main (6" PVC) LF 331 7 Water Main (8" PVC) LF 4010 8 Water Main (8" DIP) LF 3307 9 Water Main (8" DIP, Rock Excavation) LF 1343 10 Water Main (12" DIP) LF 2300
11 Valve (2" Gate) EA3
12 Valve (4" Gate) EA1
13 Valve (6" Gate) EA7
14 Valve (8" Gate) EA 26
15 Valve (12" Butterfly) EA 11
16 Valve (2" Blowoff) EA1
17 Fire Hydrant Assembly EA 15
18 Fire Hydrant Assembly (Rock Excavation) EA3
19 Reconnect Water Service (1") EA 75
20 Reconnect Water Service (1", Rock
Excavation)
EA8
21 Reconnect Water Service (2") EA2
22 Relocate Water Meter EA8
23 Abandon Valve EA 20
24 Remove Valve EA 16
25 Remove Fire Hydrant EA5

TOTAL - CONTRACT ITEMS

APPROVED
Packet Pg. 888 Attachment: Previous Staff Report - November 5, 2024, item no. 4.11(f)-Award BN 5523 (4.11(e)--Increase

CITY OF REDDING

REPORT TO THE CITY COUNCIL
Recommendation
Authorize and approve the following actions relative to Bid Negotiation No. 5523, Water Main 2024 Improvement Project, as outlined below:
(1) Increase of $38,000 to the construction management budget, bringing the construction management total to $418,000; and
(2) Increase of $362,000 to the construction contingency budget bringing the construction contingency total to $700,000.

Fiscal Impact
The Water Main 2024 Improvement Project (Project) is funded by the Public Works’ Water Utility Division. Public Works’ Water Utility has adequate funding within the current Water Main Replacement Account as previously appropriated by City Council (Council) as part of the Fiscal Year 2025-26 budget to adequately cover the $400,000 increase. Once approved, staff will process an appropriation transfer to document the transfer of funds from the Water Main Replacement Account to the project. The project cost, including the proposed increase, will be $5,067,521.

Cost Summary1
Item Authorized Amount Increase Amount Revised Amount
Project Development Costs $521 $0 $521
Contract Administration,
Inspection, Testing
$380 $38 $418
Construction Contract $3,378 $0 $3,378
Construction Contingency $338 $362 $700
Additional City Manager
Authority2
$50 $0 $50
Total Project Costs $4,667 $400 $5,067
Total Project Budget $4,700 -- $5,100
MEETING DATE: October 21, 2025
ITEM NO. 4.11(c)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(c)--Approve Increase to Project Budget for the Water Main 2024 Improvements Project
Michael Webb, Public Works
Director

APPROVED
Packet Pg. 889 Attachment: Previous Staff Report - October 21, 2025, item no. 4.11(c) - Approve Increase to Project Budget for the Water Main 2024 Report to Redding City Council October 14, 2025
Re: 4.11(c)--Increase to Project Budget for Water Main 2024 Improvement Project Page 2 Notes:
1All amounts are rounded to the nearest $1,000.
2Additional City Manager Authority, $50,000, was transferred to Construction Contingency on September 25, 2025.

Alternative Action
Council may choose not to approve the request and provide alternative direction to staff.

Without additional funding, the project scope will have to be reduced, leading to a greater potential for increased maintenance costs for the unfinished portions of the distribution system, decreased reliability of the distribution system, and increased risk of water main breaks creating significant issues for the City of Redding (City) and its customers.

Background/Analysis
The City's water system includes approximately 2.98 million feet (565 miles) of conveyance and distribution pipeline consisting of various materials and sizes ranging from 1-inch to 48- inch diameter. Assessments of the City’s water distribution system indicate the older steel, asbestos and cast-iron pipelines have had the highest rates of failure in recent years as they have reached the end of their service life.

In an effort to reduce pipeline failures, associated maintenance costs, and improve reliability to its customers, the Water Utility has focused on replacing the older piping in areas where the breaks have occurred. This project will replace over 11,000 feet of the aging water mains, 85 water service connections, 18 fire hydrants and acquire any necessary easements. The new pipeline material is a polyvinyl chloride and ductile iron piping which is expected to reduce future maintenance and provide reliable service for the foreseeable future.

On November 5, 2024, the Council awarded the construction contract for the project to Cox & Cox Construction, Inc. The notice to proceed was issued February 28, 2025, but due to concerns with the weather, the project was suspended until later in the spring when rainy weather would be more unlikely to affect construction progress.

Prior to construction beginning, a change order was issued to cover an increase in costs to accommodate a request from Caltrans regarding as-built information. The Caltrans as-built requirements were specified in their initial encroachment permit, however, after the project bid, Caltrans significantly revised the permit, changing the as-built requirements. In addition to this unexpected cost increase, when construction began in May 2025, the contractor immediately encountered conditions along South Market Street that were considerably different than what was anticipated when bidding the project. The existing asphalt in some places was up to 12- inches thick with a 10-inch thick concrete slab beneath the asphalt and other locations consisting of asphalt up to 22-inches thick.

These noted conditions required the use of different means and methods for the project installation and the two subsequent change orders depleted about 60 percent of the original contingency budget. As construction proceeded, excavation through rocky conditions was also encountered and not previously identified on the project plans, leading to additional and necessary changes.

Packet Pg. 890 Attachment: Previous Staff Report - October 21, 2025, item no. 4.11(c) - Approve Increase to Project Budget for the Water Main 2024 Report to Redding City Council October 14, 2025
Re: 4.11(c)--Increase to Project Budget for Water Main 2024 Improvement Project Page 3 The remaining areas of work on the project are near the locations where rocky conditions were previously encountered and an estimate for completing work at these locations is included in the requested increase. Other unexpected costs for this project include repairs to the surface of Wildwood Road in an effort to match the existing condition of the road prior to installation of the water main; and additional exploratory excavation to locate the existing water main along Highway 299 which appears to be at least 14-feet deep rather than the 6-feet deep shown on the plans.

The additional work attributed to the existing conditions will cause the project budget to exceed the awarded amount. An additional $400,000 is requested to cover anticipated increases to the construction contingency ($362,000) and construction management ($38,000) project components.

Environmental Review
This action, budget modification, is not a project as defined by the California Environmental Quality Act (CEQA), and no further action is required. On November 5, 2025, Council determined that the Water Main 2024 Improvement Project is categorically exempt from review under CEQA, pursuant to Section 15301 - Existing Facilities, 15302 - Replacement or Reconstruction, and 15305 - Minor Alterations in Land Use Limitations.

Council Priority/City Manager Goals
• This agenda item is a routine operational item.

Attachments
^092525 Transfer of Project funds
Previous Staff Report 110524-4.11f-Award BN 5523
Packet Pg. 891 Attachment: Previous Staff Report - October 21, 2025, item no. 4.11(c) - Approve Increase to Project Budget for the Water Main 2024 Packet Pg. 892
Attachment: Previous Staff Report - October 21, 2025, item no. 4.11(c) - Approve Increase to Project Budget for the Water Main 2024

CITY OF REDDING

REPORT TO THE CITY COUNCIL
Recommendation
Authorize and approve the following actions relative to Bid Negotiation No. 5523 (Job Order No. 2681), Water Main 2024 Improvement Project:
(1) Award to Cox & Cox Construction, Inc., in the amount of $3,378,220.50; (2) Approve an additional $380,000 to cover the cost of administration and inspection fees; (3) Approve $521,300 for project development costs;
(4) Approve $338,000 to provide construction contingency funding; (5) Authorize the City Manager to approve additional increases in either the construction management or construction contingency amounts up to a total of $50,000; and (6) Find that the Project is categorically exempt from review under the California Environmental Quality Act, pursuant to Section 15301 - Existing Facilities, 15302- Replacement or Reconstruction, and 15305 – Minor Alterations in Land Use Limitations.

Fiscal Impact
The Water Main 2024 Improvement Project (Project) is being funded by Public Works’ Water Utility Division. This project was included in the Water Utility Master Capital Plan and budget accordingly – funding this project will not impact other activities or projects.

Cost Summary
Item Estimated
Project Development Costs $521,300
Construction Contract + Contingency $3,716,221
Contract Administration, Inspection, Testing $380,000
Additional City Manager Authority $50,000
Total Project Costs $4,667,521
Total Project Budget $4,700,000
MEETING DATE: November 5, 2024
ITEM NO. 4.11(f)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(f)--Award Bid Negotiation No. 5523 (Job Order No. 2681) Water Main 2024 Improvement Project
Michael Webb, Public Works
Director

APPROVED
Packet Pg. 893 Attachment: Previous Staff Report - October 21, 2025, item no. 4.11(c) - Approve Increase to Project Budget for the Water Main 2024 Report to Redding City Council October 31, 2024
Re: 4.11(f)--Award Water Main 2024 Improvement Project Page 2 Project cost components are estimates and some shifting of the project development, construction management, and construction contingency funds may be necessary to balance the project within the approved budget.

Alternative Action
City Council may choose not to award the bid for the project and provide staff with alternate direction. Without this project, there is greater potential for increased maintenance costs, a decrease in reliability and an increased risk of water main breaks for the City of Redding (City) customers.

Background/Analysis
The City's water system includes approximately 2.98 million feet (565 miles) of conveyance and distribution pipelines of various pipe materials and sizes ranging from 1-inch to 48-inch.

Assessments of the City’s water distribution system indicate that the older steel, asbestos and cast-iron pipelines have had the highest rates of failure in recent years. To reduce pipeline failures and maintenance costs and to improve reliability to its customers, the Water Utility has focused on replacing older steel, cast-iron and asbestos piping in areas where breaks have occurred. This project will replace over 11,000 feet of aging steel, asbestos and cast-iron water mains, 85 water services, 18 fire hydrants and acquire any necessary easements. These mains have reached the end of their service life and have had several breaks in recent years that the Water Utility has repaired. This project will replace the old piping with new polyvinyl chloride (PVC) and ductile iron piping to reduce future maintenance and provide reliable service in these areas for the foreseeable future.

Attached is a tabulation of bids received and opened on October 17, 2024, for construction of the project. The low bid in the amount of $3,378,220.50 was received from Cox & Cox Construction, Inc., of Redding, California. The engineer's estimate was $3,114,025. Total project development costs for this project are estimated to be $521,300. Project development costs include engineering, surveying, right-of-way, environmental, and consultant services for the project.

Environmental Review
Staff has determined that the project is categorically exempt from environmental review under California Environmental Quality Act Guidelines, pursuant to Sections 15301 - Existing Facilities, 15302 – Replacement or Reconstruction, and 15305 – Minor Alterations in Land Use Limitations. Class 1 exemptions include the minor alteration of existing public structures and facilities. Class 2 exemptions consists of replacement or reconstruction where the new structure will be located on the same site and will have substantially the same purpose and capacity. Class 5 exemptions consist of minor alterations in land use limitations, which do not result in any changes in land use or density. The existing utilities will be replaced to provide reliable service that meets public health and safety standards. The project will be located in the right-of-way and will result in a negligible expansion of use. The action area does not have significant values for wildlife habitat or other environmental resources and the project has no potential to have a significant effect on the environment.

Council Priority/City Manager Goals
• This agenda item is a routine operational item.

APPROVED
Packet Pg. 894 Attachment: Previous Staff Report - October 21, 2025, item no. 4.11(c) - Approve Increase to Project Budget for the Water Main 2024 Report to Redding City Council October 31, 2024
Re: 4.11(f)--Award Water Main 2024 Improvement Project Page 3 Attachments
^Location Map
^Notice of Exemption
^Bid Tab

APPROVED
Packet Pg. 895 Attachment: Previous Staff Report - October 21, 2025, item no. 4.11(c) - Approve Increase to Project Budget for the Water Main 2024

CITY OF REDDING

LOCATION MAP

EXHIBIT A

WATER MAIN IMPROVEMENT
PROJECT 2024 PUBLIC WORKS

DEPARTMENT S MARKET ST WILDWOOD LN

OLD OASIS RD ALEE LN DAUT RD

OASIS RD
EUREKA WAY \ HWY 299 THELMA LN THERESA LN

GEARY ST

SUTTER ST

ELLIS ST

GRANGE ST

VEDA ST

APPROVED
Packet Pg. 896 Attachment: Previous Staff Report - October 21, 2025, item no. 4.11(c) - Approve Increase to Project Budget for the Water Main 2024 APPROVED Packet Pg. 897
Attachment: Previous Staff Report - October 21, 2025, item no. 4.11(c) - Approve Increase to Project Budget for the Water Main 2024 Shaded areas indicate corrections made in accordance with the Special Provisions. Page 1 of 3 BID TABULATION FOR:

WATER MAIN 2024 IMPROVEMENT PROJECT
Bid Schedule No.: 5523
ENGINEER'S EST Cox & Cox Construction, Inc Allen Gill Construction, Inc. 10/17/2024 UNIT UNIT UNIT

ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 Prepare Storm Water Pollution Prevention
Plan
LS 1 $5,000.00 $5,000.00 $2,596.00 $2,596.00 $9,186.00 $9,186.00 2 Implement Storm Water Pollution
Prevention Plan
LS 1 $18,000.00 $18,000.00 $25,959.00 $25,959.00 $33,482.00 $33,482.00 3 Construction Area Signs EA 28 $250.00 $7,000.00 $347.50 $9,730.00 $491.00 $13,748.00 4 Traffic Control LS 1 $100,000.00 $100,000.00 $203,337.00 $203,337.00 $216,401.00 $216,401.00 5 Trench Sheeting and Shoring LS 1 $20,000.00 $20,000.00 $97,613.00 $97,613.00 $88,083.00 $88,083.00 6 Water Main (6" PVC) LF 331 $145.00 $47,995.00 $314.00 $103,934.00 $448.00 $148,288.00 7 Water Main (8" PVC) LF 4010 $150.00 $601,500.00 $147.50 $591,475.00 $155.00 $621,550.00 8 Water Main (8" DIP) LF 3307 $160.00 $529,120.00 $164.50 $544,001.50 $136.00 $449,752.00 9 Water Main (8" DIP, Rock Excavation) LF 1343 $270.00 $362,610.00 $198.50 $266,585.50 $187.00 $251,141.00 10 Water Main (12" DIP) LF 2300 $280.00 $644,000.00 $316.50 $727,950.00 $324.00 $745,200.00 11 Valve (2" Gate) EA 3 $2,000.00 $6,000.00 $1,670.00 $5,010.00 $1,413.00 $4,239.00 12 Valve (4" Gate) EA 1 $2,300.00 $2,300.00 $2,903.00 $2,903.00 $2,031.00 $2,031.00 13 Valve (6" Gate) EA 7 $2,500.00 $17,500.00 $3,212.00 $22,484.00 $2,019.00 $14,133.00 14 Valve (8" Gate) EA 26 $3,000.00 $78,000.00 $3,731.75 $97,025.50 $2,680.00 $69,680.00 15 Valve (12" Butterfly) EA 11 $6,000.00 $66,000.00 $4,751.00 $52,261.00 $3,806.00 $41,866.00 16 Valve (2" Blowoff) EA 1 $3,500.00 $3,500.00 $3,200.00 $3,200.00 $6,779.00 $6,779.00 17 Fire Hydrant Assembly EA 15 $14,000.00 $210,000.00 $12,242.00 $183,630.00 $15,462.00 $231,930.00 18 Fire Hydrant Assembly (Rock Excavation) EA 3 $16,000.00 $48,000.00 $15,140.00 $45,420.00 $15,693.00 $47,079.00 19 Reconnect Water Service (1") EA 75 $3,500.00 $262,500.00 $2,978.00 $223,350.00 $5,893.00 $441,975.00 20 Reconnect Water Service (1", Rock
Excavation)
EA 8 $5,000.00 $40,000.00 $5,718.00 $45,744.00 $6,322.00 $50,576.00 21 Reconnect Water Service (2") EA 2 $5,000.00 $10,000.00 $10,252.00 $20,504.00 $13,677.00 $27,354.00 22 Relocate Water Meter EA 8 $1,000.00 $8,000.00 $3,468.00 $27,744.00 $5,110.00 $40,880.00 23 Abandon Valve EA 20 $550.00 $11,000.00 $1,387.00 $27,740.00 $665.00 $13,300.00 24 Remove Valve EA 16 $750.00 $12,000.00 $1,934.00 $30,944.00 $479.00 $7,664.00 25 Remove Fire Hydrant EA 5 $800.00 $4,000.00 $3,416.00 $17,080.00 $1,534.00 $7,670.00 TOTAL - CONTRACT ITEMS $3,114,025.00 $3,378,220.50 $3,583,987.00

APPROVED
Packet Pg. 898 Attachment: Previous Staff Report - October 21, 2025, item no. 4.11(c) - Approve Increase to Project Shaded areas indicate corrections made in accordance with the Special Provisions. Page 2 of 3 Site Work Solutions
Eddie Axner Construction,
Inc. SnL Group, Inc.

UNIT UNIT UNIT

PRICE TOTAL PRICE TOTAL PRICE TOTAL
$2,440.36 $2,440.36 $4,000.00 $4,000.00 $15,000.00 $15,000.00 $5,161.59 $5,161.59 $21,415.07 $21,415.07 $5,000.00 $5,000.00 $415.58 $11,636.24 $330.00 $9,240.00 $335.00 $9,380.00
$154,180.37 $154,180.37 $196,325.09 $196,325.09 $85,000.00 $85,000.00 $6,296.57 $6,296.57 $29,000.00 $29,000.00 $5,000.00 $5,000.00 $221.58 $73,342.98 $496.41 $164,311.71 $185.00 $61,235.00 $160.86 $645,048.60 $130.04 $521,460.40 $170.00 $681,700.00 $177.88 $588,249.16 $151.34 $500,481.38 $175.00 $578,725.00 $207.16 $278,215.88 $301.99 $405,572.57 $190.00 $255,170.00 $393.02 $903,946.00 $285.92 $657,616.00 $325.00 $747,500.00 $1,207.84 $3,623.52 $1,972.50 $5,917.50 $3,000.00 $9,000.00 $2,162.08 $2,162.08 $2,021.10 $2,021.10 $3,400.00 $3,400.00 $3,307.47 $23,152.29 $2,795.96 $19,571.72 $3,900.00 $27,300.00 $4,083.68 $106,175.68 $2,907.40 $75,592.40 $4,400.00 $114,400.00 $5,617.96 $61,797.56 $4,372.76 $48,100.36 $5,783.00 $63,613.00 $4,246.52 $4,246.52 $2,441.71 $2,441.71 $10,000.00 $10,000.00 $14,099.46 $211,491.90 $14,070.89 $211,063.35 $14,400.00 $216,000.00 $15,818.11 $47,454.33 $21,974.00 $65,922.00 $20,000.00 $60,000.00 $5,865.10 $439,882.50 $8,123.00 $609,225.00 $6,885.00 $516,375.00 $5,725.19 $45,801.52 $8,640.43 $69,123.44 $12,000.00 $96,000.00 $9,943.59 $19,887.18 $16,781.70 $33,563.40 $15,000.00 $30,000.00 $2,532.20 $20,257.60 $5,289.08 $42,312.64 $9,800.00 $78,400.00 $814.55 $16,291.00 $1,343.00 $26,860.00 $1,250.00 $25,000.00 $926.94 $14,831.04 $1,256.03 $20,096.48 $2,300.00 $36,800.00 $1,607.44 $8,037.20 $1,335.10 $6,675.50 $5,000.00 $25,000.00 $3,693,609.67 $3,747,908.82 $3,754,998.00
BID TABULATION FOR:

WATER MAIN 2024 IMPROVEMENT PROJECT
Bid Schedule No.: 5523
10/17/2024

ITEM DESCRIPTION UNIT QTY
1 Prepare Storm Water Pollution Prevention
Plan
LS 1
2 Implement Storm Water Pollution
Prevention Plan
LS 1
3 Construction Area Signs EA 28
4 Traffic Control LS 1
5 Trench Sheeting and Shoring LS 1
6 Water Main (6" PVC) LF 331
7 Water Main (8" PVC) LF 4010
8 Water Main (8" DIP) LF 3307
9 Water Main (8" DIP, Rock Excavation) LF 1343
10 Water Main (12" DIP) LF 2300
11 Valve (2" Gate) EA 3
12 Valve (4" Gate) EA 1
13 Valve (6" Gate) EA 7
14 Valve (8" Gate) EA 26
15 Valve (12" Butterfly) EA 11
16 Valve (2" Blowoff) EA 1
17 Fire Hydrant Assembly EA 15
18 Fire Hydrant Assembly (Rock Excavation) EA 3
19 Reconnect Water Service (1") EA 75
20 Reconnect Water Service (1", Rock
Excavation)
EA 8
21 Reconnect Water Service (2") EA 2
22 Relocate Water Meter EA 8
23 Abandon Valve EA 20
24 Remove Valve EA 16
25 Remove Fire Hydrant EA 5

TOTAL - CONTRACT ITEMS

APPROVED
Packet Pg. 899 Attachment: Previous Staff Report - October 21, 2025, item no. 4.11(c) - Approve Increase to Project Shaded areas indicate corrections made in accordance with the Special Provisions. Page 3 of 3 Stimpel-Wiebelhaus
Associated, Inc AVERAGE

UNIT BID

PRICE TOTAL TOTAL
$2,500.00 $2,500.00 $5,953.73
$20,000.00 $20,000.00 $18,502.94
$415.00 $11,620.00 $389.01
$400,000.00 $400,000.00 $209,207.24
$20,000.00 $20,000.00 $40,998.76
$330.00 $109,230.00 $332.50
$170.00 $681,700.00 $155.57
$185.00 $611,795.00 $164.95
$265.00 $355,895.00 $224.94
$240.00 $552,000.00 $314.07
$3,335.00 $10,005.00 $2,099.72
$3,710.00 $3,710.00 $2,704.53
$3,980.00 $27,860.00 $3,202.41
$5,075.00 $131,950.00 $3,812.97
$5,700.00 $62,700.00 $5,005.12
$4,330.00 $4,330.00 $5,166.21
$20,500.00 $307,500.00 $15,129.06
$23,500.00 $70,500.00 $18,687.52
$3,700.00 $277,500.00 $5,574.02
$4,500.00 $36,000.00 $7,150.94
$7,075.00 $14,150.00 $12,121.55
$4,000.00 $32,000.00 $5,033.21
$325.00 $6,500.00 $964.09
$645.00 $10,320.00 $1,256.83
$1,300.00 $6,500.00 $2,365.42

AVERAGE BID
$3,766,265.00 $3,654,164.83
BID TABULATION FOR:

WATER MAIN 2024 IMPROVEMENT PROJECT
Bid Schedule No.: 5523
10/17/2024
ITEM DESCRIPTION UNIT QTY 1 Prepare Storm Water Pollution Prevention Plan
LS1
2 Implement Storm Water Pollution
Prevention Plan
LS1
3 Construction Area Signs EA 28 4 Traffic Control LS 1 5 Trench Sheeting and Shoring LS 1 6 Water Main (6" PVC) LF 331 7 Water Main (8" PVC) LF 4010 8 Water Main (8" DIP) LF 3307 9 Water Main (8" DIP, Rock Excavation) LF 1343 10 Water Main (12" DIP) LF 2300
11 Valve (2" Gate) EA3
12 Valve (4" Gate) EA1
13 Valve (6" Gate) EA7
14 Valve (8" Gate) EA 26
15 Valve (12" Butterfly) EA 11
16 Valve (2" Blowoff) EA1
17 Fire Hydrant Assembly EA 15
18 Fire Hydrant Assembly (Rock Excavation) EA3
19 Reconnect Water Service (1") EA 75
20 Reconnect Water Service (1", Rock
Excavation)
EA8
21 Reconnect Water Service (2") EA2
22 Relocate Water Meter EA8
23 Abandon Valve EA 20
24 Remove Valve EA 16
25 Remove Fire Hydrant EA5

TOTAL - CONTRACT ITEMS

APPROVED
Packet Pg. 900 Attachment: Previous Staff Report - October 21, 2025, item no. 4.11(c) - Approve Increase to Project

CITY OF REDDING

REPORT TO THE CITY COUNCIL
Recommendation
Adopt Resolution approving and adopting the 31st Amendment to Budget Resolution No. 2025- 049 reappropriating Carbon Reduction Program funds in the amount of $500,000 from the California Street Bikeway to the upcoming Victor and Cypress Avenue Active Transportation project.

Fiscal Impact
Shasta Regional Transportation Agency (SRTA) has allocated Carbon Reduction Program (CRP) funds in the amount of $500,000 to the City of Redding. City Council (Council) previously appropriated this $500,000 for the California Street Bikeway project at the February 6, 2024 Council meeting. However, these are federal funds which would’ve required the California Street Bikeway project to comply with NEPA and, if applied to the California Street Bikeway project, would have resulted in significant schedule delays impacting other grant fund deadlines.

Therefore, since Streets (non-Federal) funds were already budgeted for both the Victor Cypress Active Transportation (VCAT) and California Street Bikeway projects, the CRP funds are being moved to VCAT, as VCAT already has federal funding and is not anticipated to experience any schedule delays as a result of the use of CRP funding. Subsequently, Streets funding to both projects was adjusted accordingly in order to complete the California Street Bikeway project; essentially swapping funding between two projects to minimize impacts to project schedule associated with grant funding requirements. The City’s partner agencies (Caltrans and SRTA) have adjusted their documentation to include this CRP funding as a part of the VCAT project and this recommended Council Action will put the City in alignment.

Alternative Action
The Council may choose not to adopt the resolution and provide staff with further direction. In this case, the City would lose $500,000 in grant funding for the project and the City’s Public Works Department would need to close the funding gap with local streets funding or traffic impact fee funds.

MEETING DATE: April 7, 2026
ITEM NO. 4.11(f)
FROM:
***APPROVED BY***
[email protected] [email protected]
SUBJECT: 4.11(f)--Adopt Resolution Reappropriating Carbon Reduction Program funds to Victor and Cypress Avenue Active Transportation Project Michael Webb, Public Works
Director/Interim Asst. City
Manager
Packet Pg. 901
Report to Redding City Council April 1, 2026
Re: 4.11(f)--Adopt Reso Reappropriating Carbon Reduction Program funds to Victor/Cypress ATP project Page 2
Background
The CRP funds are available for five years, with 65 percent allocated as “Local” CRP to regional agencies based on a population formula and the remaining 35 percent is allocated to state departments of transportation. SRTA received CRP funding totaling $657,005 for Fiscal Years (FY) 2022-23 and FY 2023-24 and administered the local CRP funds for the Shasta Region through a competitive process. Currently, SRTA has allocated the City $500,000 to help fund the VCAT project.

The proposed VCAT project is located along Victor Avenue from south of Hartnell Avenue to East Cypress Avenue, along East Cypress Avenue from Victor Avenue to Alfreda Way, and along Alfreda Way to Del Monte Street. It will construct shared-use paths, curb ramps, and bike lanes. The project will enhance safety by constructing mid-block crossings with Rectangular Rapid Flashing Beacons and by installing protected intersections for safer crossings. It will also include a roundabout installation at the Victor and Cypress Intersection.

Environmental Review
Funding appropriation is not a project as defined under the California Environmental Quality Act (CEQA), and no action is required at this time. Staff will request a CEQA determination from Council when the contract is awarded for construction of the VCAT project Council Priority/City Manager Goals
• This agenda item is a routine operational item.

Attachments
Budget Resolution
Previous Staff Report - Feb 6, 2024, item 4.11(e) - Accept CRP Funds and Adopt Budget Reso Packet Pg. 902
RESOLUTION NO. 2026 - _____

A RESOLUTION OF THE CITY OF REDDING APPROVING AND ADOPTING THE 31 st AMENDMENT TO CITY BUDGET RESOLUTION NO. 2025-049 APPROPRIATING $0 IN CARBON REDUCTION PROGRAM (CRP) FUNDS FROM CALIFORNIA

← All documents from this meeting