MASTERPLANDESIGNWITHPUBLICART-FEBRUARY8,2022
PAD10SKATEPARKCITYOFREDONDOBEACH,CALIFORNIA
MASTERPLANDESIGNWITHPUBLICART-FEBRUARY8,2022
PAD10SKATEPARKCITYOFREDONDOBEACH,CALIFORNIA
MASTERPLANDESIGNWITHPUBLICART-FEBRUARY8,2022
PAD10SKATEPARKCITYOFREDONDOBEACH,CALIFORNIA
MASTERPLANDESIGNWITHPUBLICART-FEBRUARY8,2022
PAD10SKATEPARKCITYOFREDONDOBEACH,CALIFORNIA
PAD 10 SKATEPARK - REDONDO BEACH, CA

SHEET TITLE
THE USE O( THESE PLANS SHALL BE RESTRICTED TO THE ORIGINAL SITE (OR 9HICH THE; 9ERE PREPARED, AND PUBLICATION THEREO( IS LIMITED TO SUCH USE. REPRODUCTION, PUBLICATION OR REUSE O( THESE PLANS OR CONCEPTS B; AN; METHOD, IN 9HOLE OR PART, 9ITHOUT E:PRESS 9RITTEN CONSENT (ROM SPOHN RANCH, INC. IS PROHIBITED. TITLE TO THESE PLANS AND CONCEPTS BELONGS TO SPOHN RANCH, INC. 9ITHOUT PRE,UDICE. 8ISUAL CONTACT 9ITH OR AN; OTHER USE O( THE PLANSET SHALL CONSTITUTE ACCEPTANCE O( THESE RESTRICTIONS. COP;RIGHT l 01 SPOHN RANCH, INC.

PRO,ECT TITLE
DESIGN. BUILD. COME TOGETHER.  S. CENTINELA A8E - LOS ANGELES, CA 00 O((ICE 
0-0 ` (A:

0-0 MASTER PLAN RAILING E:TENSION
B; CIT;
MATCH E:ISTING AESTHETIC
(LAT GRIND RAIL
1 - H
STEP
1 - H

BANK RAMP
 - H
3UARTER-PIPE
 H
CUR8ED 3UARTER-PIPE
 H
3UARTER-PIPE
 H
BANK E:TENSION
 H
CUR8ED GRIND LEDGE
1 - H

KICKER RAMP
1 - H

SPHERE BOLLARD
 - H

BANK BLEND HIPPED BANK
1 - H
SLAPP; CURB
 H

TIERED MANUAL PADS
ELE8ATED STAGE
10 -  - H

PARKING STRUCTURE
E

ACCESS RAMP
E

1 -0
 -
1 -0
 -0
 -


 1 -
 -
0 -0
 -0
 -

1

 -
1
1  RAILING
B; CIT;
MATCH E:ISTING AESTHETIC

1 -0
 -0 9OMEN S RESTROOM MEN S CUSTODIAL RESTROOM TRASH ROOM ELECTRICAL ROOM EDISON 8AULT STORAGE MASTERPLANDESIGN-FEBRUARY8,2022
PAD10SKATEPARKCITYOFREDONDOBEACH,CALIFORNIA
MASTERPLANDESIGN-FEBRUARY8,2022
PAD10SKATEPARKCITYOFREDONDOBEACH,CALIFORNIA
MASTERPLANDESIGN-FEBRUARY8,2022
PAD10SKATEPARKCITYOFREDONDOBEACH,CALIFORNIA
MASTERPLANDESIGN-FEBRUARY8,2022
PAD10SKATEPARKCITYOFREDONDOBEACH,CALIFORNIA
BASEDESIGN-FEBRUARY8,2022
PAD10SKATEPARKCITYOFREDONDOBEACH,CALIFORNIA
BASEDESIGN-FEBRUARY8,2022
PAD10SKATEPARKCITYOFREDONDOBEACH,CALIFORNIA
BASEDESIGN-FEBRUARY8,2022
PAD10SKATEPARKCITYOFREDONDOBEACH,CALIFORNIA
PAD 10 SKATEPARK - REDONDO BEACH, CA

SHEET TITLE
THE USE O( THESE PLANS SHALL BE RESTRICTED TO THE ORIGINAL SITE (OR 9HICH THE; 9ERE PREPARED, AND PUBLICATION THEREO( IS LIMITED TO SUCH USE. REPRODUCTION, PUBLICATION OR REUSE O( THESE PLANS OR CONCEPTS B; AN; METHOD, IN 9HOLE OR PART, 9ITHOUT E:PRESS 9RITTEN CONSENT (ROM SPOHN RANCH, INC. IS PROHIBITED. TITLE TO THESE PLANS AND CONCEPTS BELONGS TO SPOHN RANCH, INC. 9ITHOUT PRE,UDICE. 8ISUAL CONTACT 9ITH OR AN; OTHER USE O( THE PLANSET SHALL CONSTITUTE ACCEPTANCE O( THESE RESTRICTIONS. COP;RIGHT l 01 SPOHN RANCH, INC.

PRO,ECT TITLE
DESIGN. BUILD. COME TOGETHER.  S. CENTINELA A8E - LOS ANGELES, CA 00 O((ICE 
0-0 ` (A:

0-0 BASE DESIGN RAILING E:TENSION
B; CIT;
MATCH E:ISTING AESTHETIC
(LAT GRIND RAIL
1 - H

BANK RAMP
 - H
3UARTER-PIPE
 H
3UARTER-PIPE
 H
BANK E:TENSION
 H
CUR8ED GRIND LEDGE
1 - H

BANK RAMP
1 - H
SLAPP; CURB
 H

TIERED MANUAL PADS
ELE8ATED STAGE
1 - -  - H

PARKING STRUCTURE
E

ACCESS RAMP
E

1 -0
 -0
 -



0 -0
 -

1
 RAILING
B; CIT;
MATCH E:ISTING AESTHETIC

1 -0
 -0 9OMEN S RESTROOM MEN S CUSTODIAL RESTROOM TRASH ROOM ELECTRICAL ROOM EDISON 8AULT STORAGE  -
1 -0

COST ESTIMATE
PAD 10 SKATEPARK – BASE DESIGN

REDONDO BEACH, CALIFORNIA
FEBRUARY 8, 2022
ASSUMPTIONS:
• Estimate does not include site safety improvements – perimeter railing, truncated domes, signage, etc. • Estimate does not include public art improvements – painting, mural, etc. • Estimate does not include permit fees
• Estimate does not include 3rd party testing/inspections • Estimate does not include graffiti removal
• Estimate does not include taxes other than payroll taxes and sales taxes on materials • Estimate does not include any work not expressly described in Spohn Ranch’s scope of work SCOPE OF WORK: ESTIMATED COST:

DESIGN DEVELOPMENT & CONSTRUCTION DOCUMENTS $7,500.00
STRUCTURAL ENGINEERING $2,500.00
MOBILIZATION & GENERAL CONSTRUCTION REQUIREMENTS $15,000.00 CUTTING & DEMOLITION $9,000.00
GEOFOAM $7,500.00
STEEL COPING, EDGE PROTECTION & GRIND RAILS $14,000.00
CONCRETE SKATE ELEMENTS $38,300.00
CONCRETE FLATWORK & TURNDOWN WALLS $16,500.00
BONDING $2,000.00
TOTAL ESTIMATED COST INCLUDING PREVAILING WAGE: $112,300.00

COST ESTIMATE
PAD 10 SKATEPARK – MASTER PLAN DESIGN

REDONDO BEACH, CALIFORNIA
FEBRUARY 8, 2022
ASSUMPTIONS:
• Estimate does not include site safety improvements – perimeter railing, truncated domes, signage, etc. • Estimate does not include public art improvements – painting, mural, etc. • Estimate does not include permit fees
• Estimate does not include 3rd party testing/inspections • Estimate does not include graffiti removal
• Estimate does not include taxes other than payroll taxes and sales taxes on materials • Estimate does not include any work not expressly described in Spohn Ranch’s scope of work SCOPE OF WORK: ESTIMATED COST:

DESIGN DEVELOPMENT & CONSTRUCTION DOCUMENTS $10,000.00
STRUCTURAL ENGINEERING $2,500.00
MOBILIZATION & GENERAL CONSTRUCTION REQUIREMENTS $20,000.00 CUTTING & DEMOLITION $19,000.00
GEOFOAM $15,000.00
STEEL COPING, EDGE PROTECTION & GRIND RAILS $24,500.00
CONCRETE SKATE ELEMENTS $150,000.00
CONCRETE FLATWORK & TURNDOWN WALLS $35,000.00
BONDING $5,000.00
TOTAL ESTIMATED COST INCLUDING PREVAILING WAGE: $281,000.00