FTIP #: LA0G721
Subregion ID: Interstate 405, I-110, I-105, and SR-91
Ramp and Interchange Improvements (South Bay)
Project#: MR312.20
Amendment No. 6
Funding Agreement # MOU.MR312.20 A-6
Rev: 06.01.2021 1 Measure R Funding Agreement – Highways – General AMENDMENT No.6
TO MEASURE R FUNDING AGREEMENT
BETWEEN CITY OF REDONDO BEACH AND THE LOS ANGELES COUNTY
METROPOLITAN TRANSPORTATION AUTHORITY
This Amendment No. 6 to the Funding Agreement (this “Amendment”), is dated as of October 8, 2021 by and between the City of Redondo Beach ("Grantee") and the Los Angeles County Metropolitan Transportation Authority ("LACMTA").
RECITALS:
A. Grantee and LACMTA entered into that certain Funding Agreement No.
MOU.MR312.20 dated August 15, 2011, which was amended on January 30, 2017, December 1, 2017, May 15, 2019, August 31, 2019, and August 25, 2020, (as amended the "Existing FA"), which Existing FA provides for the Plans, Specifications and Estimates (PS&E), Right-of-Way, and Construction of Aviation Boulevard at Artesia Boulevard Intersection Improvements (the “Project”); and
B. WHEREAS, the Grantee desires to increase the Project’s budget of Measure R by $1,060,000 from $847,000 to $1,907,000. This amount is within the Board authorized budget increase for the Project, the total new Project budget is $1,907,000 which was approved by the LACMTA Board on July 22, 2021; and
C. WHEREAS, the Funds are currently programmed for the Project as follows $847,000 in Measure R Funds in FY 2011-12 and $1,060,000 in Measure R Funds in FY 2021-22. The total designated amount for the Project is $1,907,000; and D. WHEREAS, the LACMTA Board on October 25, 2018, delegated administrative authority to staff to extend funding lapse dates to meet PAED, PS&E, ROW, and Construction time frames; and
E. WHEREAS, the Grantee and LACMTA desire to extend the lapsing date of FY 2011-12 funds to June 30, 2024; and
F. Grantee and LACMTA desire to amend the Existing FA as provided herein.
FTIP #: LA0G721
Subregion ID: Interstate 405, I-110, I-105, and SR-91
Ramp and Interchange Improvements (South Bay)
Project#: MR312.20
Amendment No. 6
Funding Agreement # MOU.MR312.20 A-6
Rev: 06.01.2021 2 Measure R Funding Agreement – Highways – General AGREEMENT:
NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the parties hereby agree as follows:
1. Part I, Paragraph 2.2 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following: “To the extent the Measure R funds are available, LACMTA shall make to GRANTEE a grant of the Measure R funds in the amount of $1,907,000 (the “Funds”) for the Project. LACMTA Board of Directors actions on February 24, 2011 and July 22, 2021 granted the Measure R Funds for the Project. The Funds are currently programmed over 2 Fiscal Years (FY) FY 2011-12, and FY 2021-22.”
2. Part II, Section 9.1 (iv) of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following: “Expending the Measure R Funds granted under this FA for allowable cost within five years or 60 months from July 1 of the Fiscal Year in which the Funds are programmed, unless otherwise stated in this FA. All Funds programmed for FY 2011- 12 are subject to lapse by June 30, 2024. Expending the Measure R Funds granted under this FA for allowable cost within three years or 36 months from July 1 of the Fiscal Year in which the Funds are programmed, unless otherwise stated in this FA.
All Funds programmed for FY 2021-22 are subject to lapse June 30, 2024.”
3. Attachment A of the Existing FA is hereby replaced by Attachment A-1, attached.
4. Attachment B1-5 of the Existing FA is hereby replaced by Attachment B1-6, attached.
5. Attachment C-4 of the Existing FA is hereby replaced by Attachment C-5, attached.
6. Attachment E- TIP Sheet of the Existing FA is hereby replaced by Attachment E-1, attached.
7. Except as expressly amended hereby, the Existing FA remains in full force and effect as originally executed. All rights and obligations of the parties under the Existing FA that are not expressly amended by this Amendment shall remain unchanged.
FTIP #: LA0G721
Subregion ID: Interstate 405, I-110, I-105, and SR-91
Ramp and Interchange Improvements (South Bay)
Project#: MR312.20
Amendment No. 6
Funding Agreement # MOU.MR312.20 A-6
Rev: 01.25.2021 3 Measure R Funding Agreement – Highways – General IN WITNESS WHEREOF, the parties have caused this Amendment No.6 to the FA to be executed by their duly authorized representatives as of the dates indicated below:
LACMTA:
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY By: ________________________________________ Date: ____________________ Stephanie N. Wiggins
Chief Executive Officer
APPROVED AS TO FORM:
RODRIGO A. CASTRO-SILVA
County Counsel
By: ________________________________________ Date: ____________________ Deputy
GRANTEE:
CITY OF REDONDO BEACH
By: _______________________________________ Date: ____________________ William C. Brand
City Mayor
APPROVED AS TO FORM:
By: _______________________________________ Date: ____________________ Michael W. Webb
City Attorney
ATTEST:
By: _______________________________________ Date: ____________________ Eleanor Manzano
City Clerk
FTIP #: LA0G721
SOURCES OF FUNDS Prior Years FY 2018-19 FY2019-20 FY2020-21 FY2021-22 FY2022-23 Total Budget
% of Budget
LACMTA PROGRAMMED FUNDING
MEASURE R FUNDS $ 847,000 $ 1,060,000 $ 1,907,000
LACMTA PROGRAMMED FUNDS BY
YEAR SUBTOTAL $ 847,000 $ - $ - $ - $ 1,060,000 $ - $ 1,907,000 100% OTHER SOURCES OF FUNDING:
LOCAL: $ - 0%
STATE: $ - 0%
FEDERAL: $ - 0%
PRIVATE OR OTHER: $ - 0%
OTHER FUNDING SUBTOTAL $ - $ - $ - $ - $ - $ - $ - 0%
TOTAL PROJECT FUNDS $ 847,000 $ - $ - $ - $ 1,060,000 $ - $ 1,907,000 100% ATTACHMENT A-1 - PROJECT FUNDING
Measure R Program - Funding Agreement Projects - FA# MOU.MR312.20 A-6 Project Title: Aviation Boulevard at Artesia Boulevard Intersection Improvements Project#: MR312.20
PROGRAMMED BUDGET - SOURCES OF FUNDS
Rev. 05.03.19 FA Measure R Hwys Gen Attachment A Project Funds SOURCES OF FUNDS Prior
Expenditures
FY 2021-22
Qtr 1
FY 2021-22
Qtr 2
FY 2021-22
Qtr 3
FY 2021-22
Qtr 4
FY 2022-23
Qtr 1
FY 2022-23
Qtr 2
FY 2022-23
Qtr 3
FY 2022-23
Qtr 4
TOTAL
BUDGET
LACMTA PROGRAMMED FUNDS:
MEASURE R FUNDS:
PAED $0
PS&E $377,925 $3,075 $5,000 $386,000
RW Support $0
Const. Support $0
RW $450,360 $10,640 $461,000
Construction $80,000 $555,000 $350,000 $75,000 $1,060,000 Total MEASURE R $828,285 $93,715 $560,000 $350,000 $75,000 $0 $0 $0 $0 $1,907,000 PROP C 25%
PAED $0
PS&E $0
RW Support $0
Const. Support $0
RW $0
Construction $0
Total PROP C 25% $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
SUM PROG LACMTA FUNDS: $828,285 $93,715 $560,000 $350,000 $75,000 $0 $0 $0 $0 $1,907,000 SUM NON-LACMTA FUNDS : $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
PROJECT FUNDING
FY21-22 and FY22-23 $828,285 $93,715 $560,000 $350,000 $75,000 $0 $0 $0 $0 $1,907,000
SUMMARY OF ALL FUNDS
PAED $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
PS&E $377,925 $3,075 $5,000 $0 $0 $0 $0 $0 $0 $386,000
RW Support $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Const. Support $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
RW $450,360 $10,640 $0 $0 $0 $0 $0 $0 $0 $461,000
Construction $0 $80,000 $555,000 $350,000 $75,000 $0 $0 $0 $0 $1,060,000 TOTAL MILESTONES $828,285 $93,715 $560,000 $350,000 $75,000 $0 $0 $0 $0 $1,907,000 SUM PROG LACMTA FUNDS $828,285 $93,715 $560,000 $350,000 $75,000 $0 $0 $0 $0 $1,907,000 SUM NON-LACMTA FUNDS $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
TOTAL PROJECT FUNDING $828,285 $93,715 $560,000 $350,000 $75,000 $0 $0 $0 $0 $1,907,000 ATTACHMENT B1-6 - EXPENDITURE PLAN COST & CASH FLOW BUDGET Measure R Program - Funding Agreement Projects - FA# MOU.MR312.20 A-6 Project Title: Aviation Boulevard at Artesia Boulevard Intersection Improvments Project#: MR312.20
PROGRAMMED SOURCES OF FUNDS
FTIP #: LA0G721
Subregion ID: Interstate 405, I-110, I-105, and SR-91
Ramp and Interchange Improvements (South Bay)
Project# MR312.20
Amendment No. 6
Funding Agreement# MOU.MR312.20 A-6
Rev: 11.1.14 1 Attachment C-5
Scope of Work
ATTACHMENT C-5
SCOPE OF WORK
PROJECT TITLE:Aviation Boulevard at Artesia Boulevard Intersection Improvements Project
PROJECT LOCATION:
The project is located in the City of Redondo Beach of the Los Angeles County, within the South Bay area.
PROJECT LIMITS:
This project limits are Aviation Boulevard on the south side of Artesia Boulevard for a length of approximately 250 feet south of the intersection.
NEXUS TO HIGHWAY OPERATION DEFINITION / PROJECT PURPOSE:
The intersection of Aviation Boulevard and Artesia Boulevard is a major entryway to the City of Redondo Beach. Artesia Boulevard is a primary travel corridor to Interstate I-405 (I-405) and State Route 91 (SR-91) freeways. This intersection improvement project will improve regional traffic flow and reduce congestion on two key arterials, an eligible Highway Operational Improvement.
PROJECT BACKGROUND:
Aviation Boulevard is a regionally significant arterial that supports the movement of commuters and goods in the South Bay region of LA County. This particular intersection is a major north-south corridor from the residential areas in the southern part of the South Bay and to the employment center to the north. Aviation Boulevard carries approximately 32,000 – 37,100 vehicles per day and Artesia Boulevard carries roughly 33,000 vehicles per day. Motorists, including commuters and goods transporters, traverse Aviation Boulevard to access many regionally significant destinations including LAX, El Segundo Employment Center, Galleria at South Bay, Del Amo Fashion Center and a host of Piers and beaches. Additionally, Aviation Boulevard is a critical link to several freeways in the region including I-405, I-105 and SR-91.
PROJECT BUDGET:
COMPONENT AMOUNT
PS&E 386,000
R/W 461,000
Construction 1,060,000
Total Budget $1,907,000
FTIP #: LA0G721
Subregion ID: Interstate 405, I-110, I-105, and SR-91
Ramp and Interchange Improvements (South Bay)
Project# MR312.20
Amendment No. 6
Funding Agreement# MOU.MR312.20 A-6
Rev: 11.1.14 2 Attachment C-5
Scope of Work
PROJECT SCOPE:
The project will install an additional right turn lane (approximately 250 feet in length) on northbound Aviation Boulevard to eastbound Artesia Boulevard. Additionally, the proposed improvements include removing and constructing a new sidewalk in the acquired right-of way along with curbs, gutters and driveways; relocating the traffic signal pole on the southeast corner of the intersection; traffic striping modifications, installing new signal loop detectors, and new street pavement. The proposed improvements will require the purchase of additional right of way from the owner of the service station located at the southeast corner.
This proposed project will decrease travel time, relieve intersection backup and improve congested traffic conditions. Currently this intersection is heavily congested during the morning and afternoon rush hours, due to through and right turning vehicles sharing a single lane. The project will improve the current Level of Service, LOS F, at the intersection, to a LOS E.
DESIGN:
I. Preliminary Design
Tasks to be performed include the following, as applicable:
A. Account for field visits of the project area to identify design issues.
Record existing site conditions in photographs and/or video.
B. Read, review and understand all aspects and goals of the Lead Agency’s General Plan Circulation Element and other plans, as these plans pertain to the widening and ultimate build-out of the Aviation Boulevard.
C. Incorporate agreed layout plans into the final design.
D. Provide a complete survey of the project area, establishing horizontal and vertical control for the project including the adjacent property.
Mapping shall include topographic features within 50 feet of project area.
E. Identify and coordinate with all utilities in the project area to facilitate the final design of the Project.
F. Conduct geotechnical investigations or substantiate with records of prior investigation and mitigation, as required.
G. Identify right-of-way acquisitions, and/or vacations to provide for the optimal alignment of road, which shall incorporate roadway widening, development build outs and relocation/preservation of existing improvements and scenic character of the area.
H. Identify street pavement structural sections for project area.
I. Identify all drainage/BMP structure improvements, based upon hydrology, hydraulic calculations and water quality issues. Structural FTIP #: LA0G721
Subregion ID: Interstate 405, I-110, I-105, and SR-91
Ramp and Interchange Improvements (South Bay)
Project# MR312.20
Amendment No. 6
Funding Agreement# MOU.MR312.20 A-6
Rev: 11.1.14 3 Attachment C-5
Scope of Work
BMPs shall be incorporated into the street design for stormwater quality improvements prior to entering natural waterways.
J. Prepare and submit a Report/Drawings identifying the ultimate alignment of roadway improvements, as well as the recommended ultimate repair strategy for the Report. The Consultant shall prepare and provide CAD drawings of the proposed alignment, which shall include vertical and horizontal alignment, improvements, and drainage/BMP structures. Right-of-way acquisitions required for the project shall be clearly identified.
K. Prepare and submit an Engineer’s construction cost estimate for all recommended improvements identified in the Report.
II. Environmental Analysis
Tasks to be performed include the following, as applicable:
A. Perform Environmental Site Assessments as required by the City.
B. Define a complete and detailed project description and delineate project study areas that will meet the needs of technical analyses and Initial Study/Mitigated Negative Declaration (IS/MND).
C. Conduct the required technical analysis for the project.
D. Prepare, following completion of appropriate technical analysis, an Administrative Draft IS, consistent with CEQA Guidelines Appendix G, for review and approval by the City.
E. Prepare the Draft IS and Draft MND for public circulation.
F. Prepare responses to public review of Draft and prepare a Final MND and submit for review to the City.
G. Prepare an MMRP.
H. Coordinate with the City and prepare permit applications/notifications for the Project as applicable.
I. Delineation of the Waters of the US will be conducted within the ESL if applicable.
J. Prepare a final Tree report and map.
III. Final Design – Plans, Specifications and Estimates Tasks to be performed include, but are not limited to, the following:
A. Design the ultimate build out of a right turn lane on northbound Aviation Boulevard at Artesia Boulevard, and ultimate repair strategy for the intersection.
B. Prepare civil roadway plans for the required improvements, consistent with City Standards. At a minimum, the plan set shall include Title Sheet, Site Plan, General Construction Notes, Horizontal Control, FTIP #: LA0G721
Subregion ID: Interstate 405, I-110, I-105, and SR-91
Ramp and Interchange Improvements (South Bay)
Project# MR312.20
Amendment No. 6
Funding Agreement# MOU.MR312.20 A-6
Rev: 11.1.14 4 Attachment C-5
Scope of Work
Typical Sections and Details, Plan and Profile, Drainage/BMP Structure(s) Details, Traffic Striping/Signage/Signal Plans, Street Lighting/Electrical, Bike Lane (if any), and Median/Landscaping Plans.
C. Submittal of plan set shall be delivered at 50% and 90% complete and final (five (5) sets per submittal). When the project is complete, the Consultant shall provide AutoCAD files for all plan sheets.
D. Assist the City for the City Council presentation by preparing exhibits and attending meetings to discuss concerns of the property owner of the service station, particularly with issues of right-of-way acquisition and easements.
E. Prepare construction specifications consistent with City format (SSPWC “Greenbook” APWA), current edition with updates.
F. Submittal of specifications shall be delivered to the City at 90% complete and final. When project is complete, the Consultant shall provide a digital file of specification package in Microsoft Word format for Windows.
G. Prepare an engineer’s construction cost estimate based on the itemized quantity take-off from the contract documents.
H. Submittal of the engineer’s construction cost estimate shall be delivered to the City at 90% complete and final in a spreadsheet format.
IV. Project Management and Preparation of Periodic Updated Schedule, Deliverables and Meetings
Tasks to be performed include the following, as applicable:
A. Meet as needed with the City to accomplish Project tasks as outlined.
Meetings expected between the Consultant and City, shall be and not be limited to: Project Kick-off Meeting, progress meetings and preparation for the Community Information Workshop at 90% design completion.
B. Provide periodic schedule updates on deliverables and meetings as changes to original schedule occur or as needed based on the needs of the project.
RIGHT-OF-WAY:
Consultant to Perform the Task of Support Services and Perform the Appraisal and Acquisition of the Right-of-Way from the adjacent property. Consultant to perform the following tasks:
A. Prepare and provide exhibits, plats and legal descriptions for the properties requiring right-of-way acquisition, slope easements, temporary construction easements and/or right-of-entry.
FTIP #: LA0G721
Subregion ID: Interstate 405, I-110, I-105, and SR-91
Ramp and Interchange Improvements (South Bay)
Project# MR312.20
Amendment No. 6
Funding Agreement# MOU.MR312.20 A-6
Rev: 11.1.14 5 Attachment C-5
Scope of Work
B. Meet as needed with the City to accomplish Project tasks as outlined.
Meetings expected between the Consultant and City, shall be and not be limited to: Project Kick-off Meeting, site visits, progress meetings and preparation for City Council meetings.
C. Provide periodic schedule updates on deliverables and meetings as changes to original schedule occur or as needed based on the needs of the project.
D. Order title reports/litigation guarantees.
E. Present conceptual plans to property owners adjacent to project.
F. Shall choose an Appraiser to prepare and provide appraisal of properties requiring right-of-way acquisition.
G. Authorize appraisals and improvements pertaining to properties.
H. Notify and meet with property owners of appraisals and detailed improvements to their properties.
I. Set just compensation.
J. Present written offer letters and appraisal summaries to property owners.
K. Conduct negotiations to settlement.
CONSTRUCTION:
Lead Agency, here the City, expects to provide construction oversight, procure a consultant or use City’s own staff for construction management, award a contract for construction and to perform the following tasks:
A. Conduct a “Ground Breaking” ceremony for the project. At the minimum, inform the community of the impending project with signs and pamphlets.
B. Contract with a separate engineering firm to provide Construction Management for the Project. This can be accomplished through an RFP. Grantee may provide Construction Management by their own staff, if available.
C. Contract with a licensed Contractor for construction.
D. Conduct a “Ribbon Cutting” ceremony at the completion of the Project.
The Design Consultant shall meet as needed with the Lead Agency to accomplish Project tasks as outlined. Meetings expected between the Consultant and Lead Agency shall include, but not be limited to, PreConstruction Meeting, progress meetings and preparation of responses to RFIs.
FTIP #: LA0G721
Subregion ID: Interstate 405, I-110, I-105, and SR-91
Ramp and Interchange Improvements (South Bay)
Project# MR312.20
Amendment No. 6
Funding Agreement# MOU.MR312.20 A-6
Rev: 11.1.14 6 Attachment C-5
Scope of Work
MILESTONES: The implementation schedule for this project will be as follows
START DATE COMPLETION DATE
Solicitation(Bid/Proposal)Design
Develop Solicitation Package February 1, 2012 March 31, 2012 Solicitation Response May 1, 2012 June 30, 2012
Board Approval Process March 1, 2015 May 19, 2015
Contract Award March 1, 2015 May 19, 2015
Fully Executed Contract May 20, 2015 July 15, 2015
PLANNING NA
Prepare Concept Report
Prepare Feasibility Study
Prepare Project Study Report
Intelligent Transportation System
(ITS)
Feasibility Study
Concept Exploration
PRELIMINARY DESIGN
Prepare Detailed Design Plans
Prepare Detailed Construction Plans
Prepare Project Cost Estimate
Intelligent Transportation System
(ITS)
Concept of Operations
System Requirements
High Level Design
PA&ED
Prepare Environmental Document
Document Type:______________
Scoping
Technical Studies
Draft Environmental Document
Final Environmental Document
Community Outreach
Secure Project Approval
Intelligent Transportation System
(ITS)
Categorical Exemption Filing
PS&E July 16, 2015 September 30, 2021
35% PS&E July 16, 2015 August 31, 2016
Preliminary Investigations August 1, 2015 October 30, 2015 Preliminary Foundation August 1, 2015 October 30, 2015
Geometric Drawings August 1, 2015 October 30, 2015
Bridge Type Selection Roadway
and Retrofit Strategy
ADL Review
Utilities
FTIP #: LA0G721
Subregion ID: Interstate 405, I-110, I-105, and SR-91
Ramp and Interchange Improvements (South Bay)
Project# MR312.20
Amendment No. 6
Funding Agreement# MOU.MR312.20 A-6
Rev: 11.1.14 7 Attachment C-5
Scope of Work
Right-of-Way
Estimating
Civic Design November 1, 2015 August 31, 2016
Structural Design November 1, 2015 August 31, 2016
Intelligent Transportation
System (ITS)
Detailed Design
ITS Drawings
System Plans
Communications Plans
Systems Integrations Plans
Software Specifications
Project Review & Comments
65% PS&E September 1, 2016 October 31, 2016
Civil Design Plans September 1, 2016 October 31, 2016
Right-of-Way Engineering September 1, 2016 October 31, 2016 Structural Design
Prepare Project Cost Estimate September 1, 2016 October 31, 2016 Intelligent Transportation
System (ITS
Detailed Design
ITS Drawings
System Plans
Communications Plans
Systems Integrations Plans
Equipment Specifications
Software Specifications
Project Review & Comments
95% PS&E October 1, 2020 September 30, 2021
Civil Design Plans October 1, 2020 September 30, 2021
Structural Design October 1, 2020 September 30, 2021
Intelligent Transportation
System (ITS)
Detailed Design
ITS Drawings
System Plans
Communications Plans
Systems Integrations Plans
Equipment Specifications
Software Specifications
Submittals & Reviews
Submit Final PS&E October 1, 2021 October 31, 2021
Outside Agency Review October 1, 2021 October 31, 2021
RIGH OF WAY SUPPORT
FTIP #: LA0G721
Subregion ID: Interstate 405, I-110, I-105, and SR-91
Ramp and Interchange Improvements (South Bay)
Project# MR312.20
Amendment No. 6
Funding Agreement# MOU.MR312.20 A-6
Rev: 11.1.14 8 Attachment C-5
Scope of Work
CONSTRUCTION MILESTONES: The implementation schedule for this project will be as follows.
START DATE COMPLETION DATE
SOLICITATION(BID/PROP.)
CONSTRUCTION
November 1, 2021 December 15, 2021
Develop Solicitation Package November 1, 2021 November 15, 2021 Solicitation Response December 1, 2021 December 15, 2021 Evaluations
Selection
Board Approval January 1, 2022 January 15, 2022
Contract Award January 1, 2022 January 15, 2022
Fully Executed Contract January 16, 2022 January 31, 2022 Hazardous Materials Handling
Archaeological
Air Quality Monitoring
Concrete
Form Work February 1, 2022 February 28, 2022
Rebar Placement February 1, 2022 February 28, 2022
Pole Placement February 1, 2022 February 28, 2022
Traffic Control
TMP
Structural
False Work
Iron Placement
Pole Placement
Utilities
DWP
SCE March 1, 2022 March 10, 2022
LADOT March 1, 2022 March 10, 2022
Materials
Certification/Mapping
Appraisal
RIGHT OF WAY ACQUISITION
Certification/Mapping
Title Report
Meet with Property Owners November 1, 2015 March 31, 2017 Appraisal December 1, 2015 January 31, 2021
Environmental Investigation January 1, 2019 April 30, 2021 Closing/Acquire Property/Relocation December 1, 2017 October 31, 2021 Physical Possession December 1, 2017 October 31, 2021
Remediation
Utility Relocation
Third Party Coordination
Design Utilities
Relocate Utilities
FTIP #: LA0G721
Subregion ID: Interstate 405, I-110, I-105, and SR-91
Ramp and Interchange Improvements (South Bay)
Project# MR312.20
Amendment No. 6
Funding Agreement# MOU.MR312.20 A-6
Rev: 11.1.14 9 Attachment C-5
Scope of Work
Long-Lead Equipment
Staging March 11, 2022 March 15, 2022
Material Lay Down Area March 11, 2022 March 15, 2022
Signage March 11, 2022 March 15, 2022
Electrical
Power U/G Communication April 16, 2022 April 30, 2022
A/G Testing/Acceptance April 16, 2022 April 30, 2022
Landscape
Clearing
Planting
Plant Establishment
Irrigation
Testing
START DATE COMPLETION DATE
Change Orders May 15, 2022 May 31, 2022
P.O. Processing Time May 15, 2022 May 31, 2022
Weather
Third Party Issues
Strike Labor Walk Outs
Force Majeure
Claims
FTIP #: LA0G721
Subregion ID: Interstate 405, I-110, I-105, and SR-91
Ramp and Interchange Improvements (South Bay)
Project# MR312.20
Amendment No. 6
Funding Agreement# MOU.MR312.20 A-6
Rev: 11.1.14 10 Attachment C-5
Scope of Work
ATTACHMENT C-5 -Location Map(s)
Aviation Blvd. at Artesia Blvd. Intersection
Improvements
Los Angeles Metropolitan Transportation Authority
2021 Federal Transportation Improvement Program ($000)
TIP ID LA0G721 Implementing Agency Redondo Beach, City of SCAG RTP Project #: 1AL04
Conformity Category: EXEMPT - 93.127
Project Description: N58 - Aviation Blvd. Intersection Improvements at Artesia Blvd. Plans, specifications, estimates, obtaining right of way, and construction of a right turn only lane on northbound Aviation Blvd at Artesia Blvd. Project No. MR312.20. FA No. MOU.MR312.20.
Study:N/A Is Model: NO Model #:
PM: Didar Khandker - (310) 318-0661
Email: [email protected]
LS: N LS GROUP#:
EA #: PPNO:
Program Code: NCRH1 - INTERSECTION IMPROVEMENTS/CHANNELIZATION Stop Loc:
Air Basin: SCAB Envir Doc: CATEGORICALLY EXEMPT - 06/28/2011 Uza: Los Angeles-Long
Beach-Santa Ana
Sub-Area: Sub-Region: South Bay Cities
COG
CTIPS ID:
Lane # Extd: Lane # Prop: Imprv Desc:
Toll Rate: Hov acs eg loc:
0.00 Toll Colc Loc: Toll Method:
System :Local Hwy Route : Postmile: Distance: Phase: ROW Acquisition Completion Date 12/31/2028 PHASE PRIOR 20/21 21/22 22/23 23/24 24/25 25/26 BEYOND PROG TOTAL MR20H - Measure R 20% Highway PE $125 $0 $125
CON
RW
SUBTOTAL $847 $1,060 $1,907
$462 $1,060 $1,522
$260 $0 $260
TOTAL $847 $1,060
TOTAL PE: $125 TOTAL RW: $260 TOTAL CON: $1,522
$1,907
TOTAL PROGRAMMED: $1,907
- General Comment: MTA Board approved additional $1,060,000 on 07-14-21 for Construction. Board Report attached. Completion schedule changed to 06-30-22. - Modeling Comment:
- TCM Comment:
- Amendment Comment:
- CMP Comment:
- Narrative:
Last Revised Amendment 21-12 - SCAG PENDING Change reason:NEW PROJECT Total Project Cost $1,907