CITY OF REDONDO BEACH
PROPOSED BUDGET RESPONSE REPORTS
FY 2022-23 PROPOSED BUDGET
The following is a list of questions raised regarding the FY 2022-23 Proposed Budget. The corresponding answer to each of these questions (the “Budget Response Report”) follows in the sequence reflected.
Question No.
What corrections/adjustments need to be made to the FY 2022-23 Proposed Budget document for inclusion in the Adopted Budget? 1
What would it cost to refurbish the Perry Park Teen Center, specifically the kitchen and flooring? 2
What is the cost to steam clean the sidewalk on Artesia Boulevard? 3 What Budget Response Reports (BRRs) have been provided over the past three years? 4
Attachment A: FY2021-22 BRR Table of Contents 4A
Attachment B: FY2020-21 BRR Table of Contents 4B
Attachment C: FY2019-20 BRR Table of Contents 4C
What transportation services does the City operate for seniors and people with disabilities? What would be the cost to provide a Taxi/TNC Program for seniors and people with disabilities?
5 What is the status of Transit Fund Revenues for FY 2022-23, and how will they be applied throughout the City? 6
Question No.
Table of Contents Page 2
The Proposed Budget includes a Decision Package recommending funding for the restoration of facility hours at the North Branch and Main libraries. What would the North Branch Library hours of operation be if the Decision Package is approved?
7
Which area library systems have gone fine free? How much annual revenue does the Redondo Beach Public Library typically collect from fines? Why do library systems choose to go fine free?
8
How does the City’s Information Technology Equipment Replacement Program work and what equipment is recommended for replacement in FY 2022-23, per Decision Package #25 - Information Technology Equipment Replacement? 9 What is the cost for adding shade structures over existing park play equipment similar to what was constructed at Perry Park? 10
What is the cost to purchase and install radar feedback signs that collect vehicle speed data? 11
What would be the cost to install a dog run in Czuleger Park? 12
What special events were designated as “Signature Events” and received City subsidy prior to the COVID related budget reductions in Fiscal Year 2020-21? What is the City’s special event review and approval process? What are special event organizers charged for City expenses?
13 Attachment A: Special Event Invoices – Updated 13A
What is the Fire Department doing to address training needs? 14 Attachment: RBFD_Training_Booklet_2022 14A
What would it cost to repave Avenue I between Catalina Avenue and Elena Avenue? 15
Question No.
Table of Contents Page 3
What is the cost to enhance the crosswalks at S. Catalina Avenue and S.
Elena Avenue? 16
What is the cost to enhance the crosswalks at Grant Avenue and Aviation Blvd.? 17
What do other cities charge merchants for use of outdoor dining parklets in the public right of way? How much parking meter revenue is lost per parking space and what expenses are involved in constructing a dining deck? 18 What funding options are available to support the repaving of Grant Avenue? 19 What is the cost to remodel the restrooms on the International Boardwalk near Quality Seafood? 20
What is the cost to install raised crosswalks at four locations identified on Beryl Street and Diamond Street not currently included in the Capital Improvement Program?
21 What is required to improve maintenance of the upper pond at Wilderness Park and to reconstruct the lower pond? 22
What is the status of sworn police officer staffing in the Redondo Beach Police Department? 23
What are the estimated costs for the March 7, 2023 General Municipal Election? 24
What are the benefits and feasibility of a self-service program at the North Branch Library? 25
Attachment: Library Commission strategic planning letter 25A Question No.
Table of Contents Page 4
Attachment: Open+Access Quote 25B
Attachment: VectorUSA Proposal 25C
Attachment: Ocean Park Branch Photos 25D
Budget Response Reports Still in Progress
How do neighboring cities manage/administer credit card processing fees? What would be the cost to repave International Boardwalk with asphalt or concrete pavers and to paint the boardwalk’s building exteriors? What would be the cost to install a gateway arch at Artesia Blvd. and Inglewood Ave. or at Redondo Beach Blvd and Hawthorne Blvd.?
What would be required to transition City banking services from Bank of America to another competing bank?
Artesia Boulevard Sidewalk 3
BRR Table of Contents 4
Budget Corrections/Adjustments 1
City Operated Transportation Services 5
Czulegar Park Dog Run 12
Dining Deck Rent 18
Enhance Crosswalks - Grant Ave. and Aviation Blvd. 17
Enhance Crosswalks - S. Catalina Ave. and S. Elena Ave. 16 Fine Free Library Systems 8
Fire Training - Decision Package #18 and #53 14
Grant Ave Paving 19
IT Equipment Replacement - Decision Package #25 9
March 7 Election Costs 24
North Branch Library Hours - Decision Package #5 7
Open Plus Access 25
Perry Park Shade Structures 10
Perry Park Teen Center 2
Quality Seafood Restroom Remodel 20
Radar Feedback Signs 11
Raised Crosswalks 21
Repave Avenue I 15
Special Event City Charges 13
Sworn Officer Staffing 23
Transit Fund Status 6
Wilderness Park Ponds 22
FY 2022-23
BUDGET RESPONSE REPORTS
QUICK REFERENCE GUIDE
BRR #1
CITY OF REDONDO BEACH
Budget Response Report #1
June 7, 2022
Question:
What corrections/adjustments need to be made to the FY 2022-23 Proposed Budget document for inclusion in the Adopted Budget?
Response:
Corrections/adjustments that need to be made to the FY 2022-23 Proposed Budget document are listed below. The Proposed Budget materials for FY 2022-23 (updated), will be available on our website on Tuesday, June 7, 2022 at the following location.
https://www.redondo.org/services/city_docs/budget_and_capital_improvement_program .asp
⇒ Financial Summaries Section:
• The following footnotes will be added:
o The 8.33% "minimum contingency reserve" set by the City Council has already been removed from the beginning fund balance of the General Fund.
o Beginning fund balances of the Harbor Tidelands & Harbor Uplands Funds exclude capital assets such as the pier & the parking structures. • The beginning Fund Balance for the Internal Service Funds will be updated to reflect a more accurate estimated beginning fund balance. The updated fund balances will be seen in the following funds:
o Self-Insurance Program Fund
o Vehicle Replacement Fund
o Building Occupancy Fund
o Information Technology Fund
o Emergency Communications Fund
o Community Financing Authority
o Successor Agency
• Proposed Revenues will be updated in the following funds:
o Self-Insurance Program Fund
o Information Technology Fund
o Successor Agency
o Housing Successor Agency
BRR #1
• Proposed Expenditures will be updated in the following funds:
o Intergovernmental Grants Fund
o Vehicle Replacement Fund
o Building Occupancy Fund
o Information Technology Fund
o Emergency Communications Fund
o Housing Successor Agency
• Capital Outlay amounts from FY 2021-22 will be removed from the following funds:
o General Fund
o Intergovernmental Grants Fund
o Vehicle Replacement Fund
o Information Technology Fund
• Transfers In will be updated in the following funds:
o Community Financing Authority
• Transfers Out will be updated in the following funds:
o Community Financing Authority
⇒ Summary of Estimated Revenues – Before and After City Managers’ Recommendations:
• Beginning ISF Fund Balances – Updated from the Financial Summaries • Self-Insurance Fund – Charges for Services updated
• Information Technology Fund – Charges for Services updated • Community Financing Authority – Other Revenues and Transfers-In updated • Successor Agency Fund - Intergovernmental Grants and Other Revenues updated
• Housing Successor Agency Fund – Other Revenues updated ⇒ Summary of Estimated Expenditures – Before and After City Managers’ Recommendations:
• Beginning ISF Fund Balances – Updated from the Financial Summaries • General Fund – Maintenance and Operations and Capital Outlay will be updated
• Intergovernmental Grants – Capital Outlay will be updated • Vehicle Replacement – Capital Outlay will be updated
• Information Technology – Capital Outlay will be updated • Community Financing Authority – Transfers-Out will be updated • Housing Successor Agency – Personnel, Maintenance & Operations and Internal Service will be updated
⇒ Schedule of Interfund Transfers will be updated:
BRR #1
• Community Financing Authority – Transfers-In and Transfers Out will be updated
• A footnote contained FY 2021-22 and should be FY 2022-23 ⇒ Available Resources Pie Graph:
• Total City Revenues will be updated
• General Fund total will be updated
⇒ Mini Financials:
• Updated Total Revenues to Total Funding
• Beginning Fund Balance – Will be updated from the Financial Summaries • Community Financing Authority – Other Revenues and Transfers-In will be updated
Revenue Section:
⇒ Two-Year Comparison of Estimated Revenues:
• Proposed Revenue amounts for the following funds will be updated:
o General Fund Transfers-In
o Street Landscaping and Lighting
o Transit
o Capital Projects
o Self-insurance Program
o Information Technology
o Community Financing Authority
o Successor Agency
o Housing Successor Agency
⇒ General Fund License and Permits, in the outlook section of $1.85M will be updated to $1.86M.
⇒ General Fund Revenue Detail table will be updated to exclude Transfers-In ⇒ Other Funds Revenue Detail, will be updated to remove blank space on page and include the General Fund in the grand total
Expenditure Section:
⇒ Summary of the FY 2022-23 proposed General Fund operating expenses compared with the FY 2021-22 midyear budget operating expense:
• Total increase/decrease and % change will be updated
⇒ Overview of Expenditures – Capital Projects Fund, will update to remove prior year capital expenses
⇒ Two-Year Comparison of Expenditures by Fund:
BRR #1
• Amounts updated for:
o General Fund Transfers-Out
o Prop A
o Intergovernmental Grants
o Harbor Tidelands
o Harbor Uplands
o Vehicle Replacement
o Building Occupancy
o Information Technology
o Community Financing Authority
o Successor Agency
o Housing Successor Agency
• Transfers-Out will be removed from amounts
⇒ Two-year comparison of Expenditures by Department and Expenditure by Department Tables:
• Amounts updated for:
o Information Technology
o Community Services
o Public works
o Successor Agency
o Housing Successor Agency
⇒ Expenditure by Fund Detail
• General Fund to be Added to table
Department Sections:
• Variance and percentage change columns will be added due to formatting issues in the Proposed Budget document for the following departments:
o Fire
o Library
o Community Services
o Community Development
o Waterfront and Economic Development
o Public Works
• The object codes will be grouped by: Personnel, Maintenance and Operations, Internal Service Funds and Capital Outlay.
• The Police Department expenditures will be broken out by Division. The formatting of the Proposed Document had it rolled up into only three (3) areas of operations.
• Information Technology Equipment Replacement will be isolated from the Information Technology Equipment Maintenance expense. This update will be seen throughout all departments.
BRR #2
CITY OF REDONDO BEACH
Budget Response Report #2
June 7, 2022
Question:
What would it cost to refurbish the Perry Park Teen Center, specifically the kitchen and flooring?
Response:
The kitchen at the Teen Center is typically used for prepping snacks and other basic items and is equipped with limited appliances. A refurbishment of the kitchen would include the following elements and estimated costs:
New cabinets $15,000
New counter tops $10,000
New refrigerator & appliances $ 5,000
New floor tile $ 5,500
Repainting $10,000
Other/Incidentals $10,000
Kitchen Total $55,500
The majority of the floor tile in the Teen Center is in good shape. The cost to refurbish the general area, including limited flooring repairs, is detailed below:
Replace damaged floor tile (300sf) $ 5,500
Repaint interior and exterior $50,000
Repair windows $ 3,000
Replace four heating units $30,000
General Area Total $88,500
The total cost for refurbishment of the facility would be approximately $144,000.
Restrooms are not included in the estimate as the Teen Center restrooms are scheduled to be renovated as part of the CIP, under the Regional Restroom Improvements Project.
BRR #3
CITY OF REDONDO BEACH
Budget Response Report #3
June 7, 2022
Question:
What is the cost to steam clean the sidewalk on Artesia Boulevard?
Response:
The City’s portion of Artesia Boulevard between Aviation and Hawthorne contains approximately 68,000 square feet of sidewalk. The trash hauling contract with Athens Services contains pricing for steam cleaning services. The cost to clean this segment of Artesia Boulevard, twice per month, would be $21,900 per month and $262,800 per year.
Staff contacted another local steam cleaning contractor for comparative pricing. This contractor provided a cost estimate for steam cleaning ranging from $0.25 to $0.40 per square foot, depending on the condition of the sidewalk. As such, the cost to steam clean the above segment of Artesia Boulevard each time would range from $17,000 to $27,000.
The twice monthly cost of the alternative provider would therefore range from $34,000 to $54,000 per month and $408,000 to $648,000 per year, nearly double the cost of Athens.
BRR #4
CITY OF REDONDO BEACH
Budget Response Report #4
June 7, 2022
Question:
What Budget Response Reports (BRRs) have been provided over the past three years? Response:
The Table of Contents for the past three Fiscal Years of Budget Response Reports are attached as follows:
x 4A – FY 2021-22 BRR Table of Contents
x 4B – FY 2020-21 BRR Table of Contents
x 4C – FY 2019-20 BRR Table of Contents
ATTACHMENT 4A
7DEOHRI&RQWHQWV3DJH
CITY OF REDONDO BEACH
PROPOSED BUDGET RESPONSE REPORTS
FY 2021-22 PROPOSED BUDGET
7KH IROORZLQJ LV D OLVW RI TXHVWLRQV UDLVHG UHJDUGLQJ WKH )< 3URSRVHG %XGJHW 7KH FRUUHVSRQGLQJDQVZHUWRHDFKRIWKHVHTXHVWLRQV
WKH³%XGJHW5HVSRQVH5HSRUW´
IROORZVLQWKH
VHTXHQFHUHIOHFWHG
Question No.
:KDW FRUUHFWLRQVDGMXVWPHQWV QHHG WR EH PDGH WR WKH )< 3URSRVHG%XGJHWGRFXPHQWIRULQFOXVLRQLQWKH$GRSWHG%XGJHW" $WWDFKPHQW$
)<'HFLVLRQ3DFNDJHVIRU&LW\&RXQFLO$SSURYDO 6XPPDU\ $
:KDWLVWKHVWDWXVRI
$
,QVWDOOLQJ OLJKWLQJ DW WKH EHDFK DFFHVV ZDONZD\V DW 6DSSKLUH 6WUHHW7RSD]6WUHHWDQG.QRE+LOO$YHQXHDQG
%
5HSODFLQJ WKH H[LVWLQJ OLJKWLQJ DORQJ WKH XSSHU EHDFKIURQW SHGHVWULDQ ZDONZD\ EHWZHHQ 9HWHUDQV 3DUN DQG .QRE +LOO $YHQXH"
:KDW&LW\YHKLFOHVDQGHTXLSPHQWDUHVFKHGXOHGIRUUHSODFHPHQWE\WKH 3XEOLF:RUNV'HSDUWPHQWLQWKH)LVFDO<HDUZKDWPDNHVXSWKH ODUJH IXQG EDODQFH RI WKH 9HKLFOH 5HSODFHPHQW )XQG DQG ZKDW PRGLILFDWLRQVWRDOORFDWLRQVDUHUHFRPPHQGHGDVSDUWRIWKH)< EXGJHW"
:KDW LVWKHW\SLFDO EUHDNGRZQ EHWZHHQWKH EDVH YHKLFOH FRVW DQGWKH HTXLSPHQWWHFKQRORJ\DGGHGWRWKHYHKLFOH":KDWLVWKHKLVWRU\RIWKH )LUH'LYLVLRQ&KLHIYHKLFOH
8QLW
SODQQHGIRUUHSODFHPHQWLQ
)< DQG ZKDW RSWLRQV GRHV WKH &LW\ KDYH WR UHGXFH WKH H[SHQGLWXUH"
:KDWLVWKHVWDWXVRI7UDQVLW)XQGLQJIRU)<" :KDWDUHWKH&LW\¶VLQWHUQDOVHUYLFHIXQGDQGRYHUKHDGDOORFDWLRQVDQG ZKDWSROLFLHVDQGSURFHGXUHVJRYHUQWKHP":KDWDUHWKHUHDVRQVIRU ATTACHMENT 4A
Responsible Question No.
7DEOHRI&RQWHQWV3DJH
WKH FKDQJHV LQ WKH )< DOORFDWLRQV LQFOXGHG LQ WKH SURSRVHG EXGJHWIURPWKRVHLQWKH)<DGRSWHGEXGJHW"$QGZKDWLVWKH RSLQLRQRIWKHRXWVLGHDXGLWILUPUHJDUGLQJWKHLQWHUQDOVHUYLFHIXQGV" $WWDFKPHQW$
$GPLQLVWUDWLYH3ROLF\DQG3URFHGXUHV
,QWHUQDO6HUYLFH)XQG2YHUKHDG$OORFDWLRQ $
$WWDFKPHQW%
,QWHUQDO6HUYLFH)XQG$QDO\VLV %
$WWDFKPHQW&
,QWHUQDO6HUYLFH)XQGV)LQDQFLDO6WDWHPHQWV &
:KDWFKDQJHVWR)LUH,QVSHFWLRQSURJUDPFRXOGEHPDGHWRUHGXFHWKH IHHVFKHGXOH"
$WWDFKPHQW$
,QVSHFWLRQ5DWH $
$WWDFKPHQW%
5HJLRQDO,QVSHFWLRQ5DWHV %
$WWDFKPHQW&
37,QVSHFWLRQ5DWH &
:KDW ORFDWLRQV FRXOG VXSSRUWWKH LQVWDOODWLRQ RID QHZ GRJ UXQIDFLOLW\ ZKDWDUHWKHFRVWVDQGLPSDFWVRIDGRJUXQDQGZKDWLPSURYHPHQWVDUH LQFOXGHGLQWKHEXGJHWIRUWKH&LW\¶VH[LVWLQJ'RJ3DUN"
$WWDFKPHQW$
3HUU\3DUNDHULDOPDS $
$WWDFKPHQW%
'RPLQJXH]'RJ3DUN&,3 %
&RXOG 0F1HLOO-D\FHH 3DUNHWWH )UDQNOLQ 3DUN DQGRU /LOLHQWKDO 3DUN VXSSRUWWKHLQVWDOODWLRQRIDQHZGRJUXQIDFLOLW\DQGZKDWZRXOGEHWKH FRVWVDQGLPSDFWVRIWKHIDFLOLWLHV"
$WWDFKPHQW$
3HUU\3DUNDHULDOPDS $
$WWDFKPHQW%
)UDQNOLQ3DUNDHULDOPDS %
ATTACHMENT 4A
Responsible Question No.
7DEOHRI&RQWHQWV3DJH
$WWDFKPHQW&
'RPLQJXH]'RJ3DUN&,3 &
:KDWDGGLWLRQDOGHWDLOFDQEHSURYLGHGIRUNH\GHSDUWPHQWDOPDLQWHQDQFH DQGRSHUDWLRQVH[SHQGLWXUHOLQHLWHPV"
$WWDFKPHQW$
.H\'HSDUWPHQWDO0 2([SHQGLWXUH'HWDLO $
:KDWGRHVLPSOHPHQWDWLRQRIWKHELF\FOHSODQJUDQWHQWDLO"
$WWDFKPHQW$
/LVW RI FRUULGRUV LQFOXGHG LQWKH%LF\FOH7UDQVSRUWDWLRQ 3ODQ,PSOHPHQWDWLRQ3URMHFW&)3
2FWREHU
$
:KDW LV WKH SURFHVV IRU FRQVLGHULQJ VSHFLDO HYHQWV DQG ZKDW VSHFLDO HYHQWV DUH SURMHFWHG WR EH KHOG LQ WKH &LW\ GXULQJ WKH )LVFDO <HDU"
:KDW DUH WKH FRVWV DQG WKH WLPHIUDPH DVVRFLDWHG ZLWK UHWDLQLQJ DQ H[HFXWLYHVHDUFKILUP"
$WWDFKPHQW$
%RE0XUUD\DQG$VVRFLDWHV±3URSRVDO $
$WWDFKPHQW%
3HFNKDP 0F.HQQH\±3URSRVDO %
$WWDFKPHQW&
5DOSK$QGHUVHQDQG$VVRFLDWHV±3URSRVDO &
:KDWRSWLRQVH[LVWWRHQKDQFHVDIHW\IRUWKH$UWHVLD)HOWRQDQG $UWHVLD5LQGJHLQWHUVHFWLRQV"
:KDWZRXOGEHWKHFRVWWRLQVWDOOEXOERXWVDWHYHU\*UDQW$YHQXH LQWHUVHFWLRQQRWDOUHDG\LQFOXGHGLQWKH&DSLWDO,PSURYHPHQW3URJUDP" :KDWZRXOGEHWKHFRVWWRUHKDELOLWDWHWKH$QGHUVRQ3DUN6HQLRU&HQWHU WRLQFOXGH+9$&DQG3$V\VWHPV"
ATTACHMENT 4A
Responsible Question No.
7DEOHRI&RQWHQWV3DJH
:KDW UHSDLUV DUH QHHGHGWRWKH$QGHUVRQ3DUN6FRXW +RXVHIDFLOLWLHV DQGZKDWLVWKHFRVWRIUHSDLUVYVWKHFRVWRIIXOOUHFRQVWUXFWLRQ" :KDW KDV EHHQ WKH KLVWRU\ RI 4XLPE\ IHH FROOHFWLRQ ZKDW UHYHQXH LV H[SHFWHGLQ)<DQGZKDWDUHWKHSODQQHGXVHV" :KDWLVWKHVWDWXVRIVZRUQRIILFHUVWDIILQJLQWKH3ROLFH'HSDUWPHQW" :KDWDUHWKHQHZRQJRLQJWHFKQRORJ\QHHGVRIWKH3ROLFH'HSDUWPHQW"
:KDWLVWKHFXUUHQWVWDWXVRISDLGSDUNLQJSURJUDPVLQWKH&LW\DQGZKDW LV WKH EUHDNGRZQ RI WKH DGGLWLRQDO VPDUW PHWHUV WR EH LQVWDOOHG SHU 'HFLVLRQ3DFNDJH"
:KDWOHYHORIFURVVLQJJXDUGVHUYLFHVGRHVWKH&LW\FXUUHQWO\SURYLGHDQG ZKDWDUHWKHDQWLFLSDWHGEHQHILWVRIRXWVRXUFLQJVXSSOHPHQWDOFURVVLQJ JXDUGVHUYLFHVSHU'HFLVLRQ3DFNDJH"
:KDW DUH WKH VHUYLFH DJUHHPHQWVWKDW DUH QHFHVVDU\ WRPDLQWDLQ)LUH 'HSDUWPHQWRSHUDWLRQV":KDWLVWKHIXQGLQJ VRXUFHIRUWKHVH VHUYLFH DJUHHPHQWVDQGSODWIRUPV"
+RZZLOOWKHSURSRVHG'HFLVLRQ3DFNDJH¶VHQKDQFH WKH )LUH 'HSDUWPHQW¶V GLUHFW DQG LQGLUHFW OLIHVDYLQJ HIIRUWV WR WKH FRPPXQLW\"
:KDWLVWKHVWDWXVRIFXUUHQWVWDIILQJOHYHOVLQWKH5HGRQGR%HDFK)LUH 'HSDUWPHQW"
:KDW LV WKH PLVVLRQ RI WKH )LUH 'HSDUWPHQW DQG KRZ LV LW VWDIIHG WR DFFRPSOLVKWKHPLVVLRQ"
:KDW DUH WKH )LUH 'HSDUWPHQW¶V WUDLQLQJ QHHGV LQ RUGHU WR PHHW WKH &RPPXQLW\¶VUHVSRQVHQHHGV":KDWLVWKHFRVWWRWUDLQILUHSHUVRQQHO WKHLGHQWLILHGWUDLQLQJJRDOV"
ATTACHMENT 4A
Responsible Question No.
7DEOHRI&RQWHQWV3DJH
:KLFKVWUHHWVZLOOEHFRQVWUXFWHGDVSDUWRIWKHFXUUHQWUHVLGHQWLDOVWUHHW UHKDELOLWDWLRQ DQG VOXUU\ VHDO FDSLWDO LPSURYHPHQW SURMHFWV DQG ZKLFK VWUHHWVDUHDQWLFLSDWHGWREHLQFOXGHGLQWKH)<SURMHFWV"
$WWDFKPHQW $
&LW\ZLGH DQG 'LVWULFW 0DSV IRU 5HVLGHQWLDO 6WUHHW5HKDEDQG6OXUU\6HDO3URMHFWV $
:KDW LPSURYHPHQWV DUH SODQQHG LQ)< XVLQJ7UDIILF&DOPLQJ 3URMHFWIXQGV"
:KDWRQJRLQJPDWHULDOVDQGHTXLSPHQWZLOOEHSXUFKDVHGZLWKWKHIXQGV UHTXHVWHGLQ'HFLVLRQ3DFNDJH"
:KDWLPSURYHPHQWVDUHDQWLFLSDWHGLQ)<IRUWKH&LW\¶VSDUNV DQGUHFUHDWLRQIDFLOLWLHVLGHQWLILHGDVEHLQJLQSRRUFRQGLWLRQDVSDUWRIWKH PRVWUHFHQWDVVHVVPHQWLQFOXGLQJZKDWLPSURYHPHQWVFDQEHGRQHWR WKHDUHDNQRZQDV7XUWOH3DUNDERYHWKH,QWHUQDWLRQDO%RDUGZDON"
:KDWLVWKHFRVWDQGIHDVLELOLW\RIUHSDLULQJWKHLUULJDWLRQOLQHVDORQJWKH 1RUWK5HGRQGR%HDFK%LNHZD\
6&(ULJKWRIZD\
":KDWRSWLRQVGRHV
WKH&LW\KDYH WRLPSURYH52:PDLQWHQDQFHDQGHQKDQFHWKHELNHZD\¶V DSSHDUDQFH"
:KDWLVWKHFRVWRIVWXG\LQJDQGLQVWDOOLQJVWRSVLJQVDWWKHLQWHUVHFWLRQV ZLWKLQ WKH ERXQGV RI ,QJOHZRRG $YHQXH $YLDWLRQ %RXOHYDUG $UWHVLD %RXOHYDUGDQG*UDQW$YHQXH"
:KDW ZRXOG EH WKH FRVW WR LQVWDOO IOH[LEOH GHOLQHDWRUV DQG SHGHVWULDQ DGYLVRU\VLJQVPLGVSDQRIVWUHHWDWPDUNHGFURVVZDONV",VLWDGYLVDEOH SHU WKH &DOLIRUQLD 0DQXDO IRU 8QLIRUP 7UDIILF &RQWURO 'HYLFHV &$
087&'
"
&DQILQHV EH DYRLGHG ZLWKWKH LQVWDOODWLRQ RI D UHFLUFXODWLRQ V\VWHP DW 6HDVLGH/DJRRQDQGZKDWLVWKHHVWLPDWHGFRVWRIDUHSODFHPHQWIDFLOLW\" :KDW 5HGRQGR %HDFK 3HUIRUPLQJ $UWV &HQWHU 'HIHUUHG %XLOGLQJ 0DLQWHQDQFH1HHGVKDYHEHHQLGHQWLILHGDQGZKDWDUHWKHLUFRVWV" ATTACHMENT 4A
Responsible Question No.
7DEOHRI&RQWHQWV3DJH
:KDWZRXOGLWWDNHWRPRGLI\WKHWUDIILFVLJQDOVDWWKHLQWHUVHFWLRQVRI'HO $PR 3URVSHFWDQGDW%HU\O 3DFLILF&RDVW+LJKZD\WRFRQYHUWWKHOHIW WXUQPRYHPHQWVWREHFRPHSURWHFWHGOHIWWXUQSKDVLQJRSHUDWLRQ"
:KDW ZRXOG LW FRVW DQGWDNHWR FRQGXFWIRXUWR VL[ FRPSRVW JLYHDZD\ HYHQWVSHU\HDU"
:KDW LPSDFW GR &DO3(56 UDWH LQFUHDVHV KDYH RQ WKH &LW\¶V EXGJHW" :KDWDUHWKHSURMHFWHGLQFUHDVHVLQ)<"$QGZKDWLVWKHVWDWXV RI WKH ERQG LVVXH WR UHILQDQFH WKH &LW\¶V &DO3(56 XQIXQGHG DFFUXHG OLDELOLW\
8$/
"
:KDW PRGLILFDWLRQV WR DOORFDWLRQV DUH UHFRPPHQGHG DV SDUW RI WKH )< EXGJHW EDODQFLQJ DQG ZKDW HTXLSPHQW LV VFKHGXOHG IRU UHSODFHPHQW DV UHFRPPHQGHG LQ WKH ,QIRUPDWLRQ 7HFKQRORJ\ ± (TXLSPHQW5HSODFHPHQW'HFLVLRQ3DFNDJH
"
:KDWLVWKHVWDWXVRIWKH&LW\¶V6DLOLQJ3URJUDP":KDWLVWKHDQWLFLSDWHG OHYHORISURJUDPSDUWLFLSDQWVUHYHQXHDQGQXPEHURI%RDWV"
:KDWLVWKHW\SLFDOSHUXQLWFRVWIRUWKHLQVWDOODWLRQRIRQJUDGHSDUNLQJ VSDFHVYVVWUXFWXUHGSDUNLQJVSDFHV":KDWZDVWKHHVWLPDWHGFRVW IRUWKH5LYLHUD9LOODJH3DUNLQJVWUXFWXUHSURYLGHGE\:DONHU &RQVXOWDQWV"
$WWDFKPHQW$
1$GPLQLVWUDWLYH5HSRUWDQG)HDVLELOLW\
5HSRUWIRUWKH5LYLHUD9LOODJH%XVLQHVV,PSURYHPHQW'LVWULFW3DUNLQJ 6WUXFWXUH
$
:KDWZRXOGLWFRVWWRLQVWDOORSHUDWHDQGPDLQWDLQDPHWHUSRROLQ WKHORWEHKLQG$YLDWLRQ*\PQDVLXP"
:KDWZRXOGEHWKHFRVWVWRLQVWDOODIHQFHDORQJWKHIURQWDFFHVVRI 7RZQVHQG3DUNHWWH"
:KDWZRUNLVQHFHVVDU\DQGDWZKDWFRVWWRFRQWUROWKHHURVLRQRQWKH QRUWKVORSHRI'RPLQJXH]3DUNDORQJ
WK6WUHHW"
ATTACHMENT 4A
Responsible Question No.
7DEOHRI&RQWHQWV3DJH
:KDWDUHWKHSRWHQWLDOYLDEOHVLWHVIRUIXWXUHFRPPXQLW\JDUGHQVDQG ZKDWDUHWKHHVWLPDWHGDVVRFLDWHG&LW\FRVWV"
$WWDFKPHQW$
6XUYH\HG&RPPXQLW\*DUGHQ6LWHV $
:KDWLVWKHLPSDFWWRWKH)<EXGJHWRIDQH[WHQVLRQWRWKH 6RXWK%D\&HQWHU63(//&DJUHHPHQWIRURYHUWLPHGHSOR\PHQWRI&LW\ 3ROLFH2IILFHUVDWWKH6RXWK%D\*DOOHULD"
:KDWZRXOGLWFRVWWRLQVWDOOJUHHQELNHODQHVRQ*UDQW$YHQXHIURP $YLDWLRQ%OYGWR,QJOHZRRG$YH"
$WWDFKPHQW$
6DPSOHLQWHUPLWWHQWJUHHQSDLQWGHVLJQ±5HYLHZ
6HW7RUUDQFH%OYG $
:KDWLVWKHFRVWWRSXUFKDVHDVWULSLQJWUXFNIRUODQHVWULSLQJDQGD WKHUPRSODVWLFVWULSLQJWUXFN"
:KDWSODQQLQJHIIRUWVDUHEHLQJPDGHWRWUDQVLWLRQ%HDFK&LWLHV7UDQVLW WR=HUR(PLVVLRQ%XVHV"
$WWDFKPHQW$
&$5%,&75HJXODWLRQ)DFW6KHHW $
$WWDFKPHQW%
=(%7HFKQRORJLHV %
$WWDFKPHQW&
=(%5$=(%'HSOR\PHQW*XLGH &
$WWDFKPHQW'
6XEUHJLRQDO0RELOLW\0DWUL[6RXWK%D\&LWLHV ' +RZPXFKUHYHQXHLVFROOHFWHGIURPFRQWUDFWUHFUHDWLRQFODVVHV"
ATTACHMENT 4A
Responsible Question No.
7DEOHRI&RQWHQWV3DJH
:KDW LV WKH IHDVLELOLW\ RI UHSODFLQJ WKH .LQJ +DUERU 0DUTXHH 6LJQ RQ +DUERU'ULYHZLWKHLWKHUDOLNHIRUOLNHUHSODFHPHQWRUZLWKDQHOHFWURQLF PHVVDJHGLVSOD\VLJQXSJUDGH"
:KDWLVWKH&LW\¶VFXUUHQWOHYHORI&RGH(QIRUFHPHQWVWDIILQJKRZGRHV LW FRPSDUH WR KLVWRULF OHYHOV DQG ZKDW DUH WKH FRVWV WR SURYLGH VXSSOHPHQWDO FRGH HQIRUFHPHQW VHUYLFHV" +RZ LV &RGH (QIRUFHPHQW UHVSRQVH H[SHFWHG WR LPSURYH E\ WUDQVIHUULQJ SHUVRQQHO IURP WKH &RPPXQLW\ 'HYHORSPHQW 'HSDUWPHQW WR WKH 3ROLFH 'HSDUWPHQW SHU 'HFLVLRQ3DFNDJH"
$WWDFKPHQW$
$GPLQLVWUDWLYH5HSRUW±6XSSOHPHQWDO&RGH(QIRUFHPHQW 6HUYLFHV $
:KDWLVWKHSURFHVVWRREWDLQDQXSGDWHG)LUH6HUYLFHVSURSRVDOIURP /RV$QJHOHV&RXQW\DQGZKDWLVWKHVWDWXVRIWKHUHYLHZZLWK0DQKDWWDQ %HDFK DQG (O 6HJXQGR IRU WKH SRVVLEOH VKDULQJ RI ILUH DGPLQLVWUDWLRQ SHUVRQQHO"
$WWDFKPHQW$
)HDVLELOLW\6WXG\3URFHVVLQ%ULHI $
$WWDFKPHQW %
*XLGHOLQHV DQG 3URFHVVHV ± 5HTXHVWV IRU )LUH 'LVWULFW 6HUYLFHV
-XO\
%
:KDWDUHWKH FORVLQJFRVWVIRUWKH0DUFKQG*HQHUDO0XQLFLSDO (OHFWLRQDQGRWKHUFRVWDOWHUQDWLYHVIRUIXWXUHHOHFWLRQVVXFKDV5DQNHG &KRLFH9RWLQJWRFRQVLGHU"
:KDWZDVWKHIHHGEDFNUHFHLYHGIURPWKH+DUERU/LEUDU\3XEOLF:RUNV DQG%XGJHWDQG)LQDQFH&RPPLVVLRQVRQWKH)<3URSRVHG %XGJHWDQGWKH)<3URSRVHG)LYH<HDU&DSLWDO,PSURYHPHQW 3URJUDP"
$WWDFKPHQW$
/LEUDU\&RPPLVVLRQ/HWWHUWRWKH0D\RUDQG&LW\&RXQFLO $ $WWDFKPHQW%
0LQXWHVIURPWKH%XGJHWDQG)LQDQFH&RPPLVVLRQDQG
3XEOLF:RUNV&RPPLVVLRQ-RLQW0HHWLQJ %
ATTACHMENT 4A
Responsible Question No.
7DEOHRI&RQWHQWV3DJH
$WWDFKPHQW&
0HPR&RQWDLQLQJ+DUERU&RPPLVVLRQ5HFRPPHQGDWLRQV & $WWDFKPHQW '
0HPR &RQWDLQLQJ %XGJHW DQG )LQDQFH &RPPLVVLRQ
5HFRPPHQGDWLRQV '
:KDW LV WKH )< IXQGLQJ VWDWXV
LQ WKH FRUH EXGJHW DQG DIWHU
GHFLVLRQ SDFNDJHV
RI SRVLWLRQV WKDW ZHUH GHDXWKRUL]HG IUR]HQ DQG HOLPLQDWHG ZLWK UHRUJDQL]DWLRQV LQ )< " $QG ZKDW DGGLWLRQDO SRVLWLRQVDUHUHFRPPHQGHGLQ)<'HFLVLRQ3DFNDJHV"
$WWDFKPHQW$
/LVWLQJRI3RVLWLRQV $
:KDWDUHWKH&LW\¶V*HQHUDO)XQGSUREDEOHEHVWDQGZRUVWFDVHILQDQFLDO VFHQDULRVIRU)<WR)<"
$WWDFKPHQW$
*HQHUDO)XQG)LYH<HDU)LQDQFLDO3ODQ $
:KDW ZRXOG EH UHTXLUHG WR DGG DQ DGPLQLVWUDWLYH FLWDWLRQ SURJUDP IRU FHUWDLQFRGHYLRODWLRQV":KDWDUHWKHFRVWVRIVXFKDSURJUDP"+RZGR RXUQHLJKERULQJFLWLHVSURFHVVFRGHYLRODWLRQV"
:KDWDUHSRVVLEOHRSWLRQVIRULQYHVWLJDWLQJILQDQFLDOYLRODWLRQVUHODWHGWR FDPSDLJQFRQWULEXWLRQV"
$WWDFKPHQW$
2UGLQDQFH $
$WWDFKPHQW%
&DPSDLJQ&RQWULEXWLRQ/LPLWVFXUUHQWVXPPDU\ %
ATTACHMENT 4A
ATTACHMENT 4B
Table of Contents Page 1
CITY OF REDONDO BEACH
BUDGET RESPONSE REPORTS
FY 2020-21 PROPOSED BUDGET
The following is a list of questions raised regarding the FY 2020-21 Proposed Budget.
The corresponding answer to each of these questions (the “Budget Response Report”) follows in the sequence reflected.
Question No.
What corrections/adjustments need to be made to the FY 2020-21 Proposed Budget document for inclusion in the Adopted Budget? 1 Attachment A: WED Division Pages 1A
What corrections/adjustments need to be made to the FY 2020-21 Proposed Budget document for inclusion in the Adopted Budget? 1B Attachment A: Revised Financial Summary 1BA
Attachment B: Revised Decision Package Listing 1BB
What corrections/adjustments need to be made to the FY 2020-21 Proposed Budget document for inclusion in the Adopted Budget? 1C Attachment A: Fire Performance Measure Hours 1CA
How does the City’s current and recommended staffing levels compare with that of surrounding cities? And how do the FY 2020-21 staffing levels compare with prior years?
2 Attachment A: Full-time Employees Per Capita Comparison 2A Attachment B: Employees Per Department Comparison 2B
Attachment C: Historical Budgeted Full-time Employee Count 2C Are there alternatives to the budget balancing measures proposed in the FY 2020-21 decision packages? 3
What was the cultural and entertainment rental activity at the RBPAC in FY 2019-20 and how has the Business Plan approved in 2007 affected the Center’s fiscal impact and facility booking percentages? 4 What is the status of Transit Funding for FY 2020-21? 5 ATTACHMENT 4B
Responsible Question No.
Table of Contents Page 2
What City vehicles and equipment are scheduled for replacement by the Public Works Department in the 2020-21 Fiscal Year, and what modifications to allocations are recommended as part of the FY 2020-21 budget balancing?
6
What is the process for considering special events and what special events are projected to be held in the City during the 2020-21 Fiscal Year?
7 Attachment A: Special Events Calendar 2020 7A
What modifications to allocations are recommended as part of the FY2020-21 budget balancing and what equipment is scheduled for replacement as recommended in the Information Technology – Equipment Replacement Decision Package #40?
8
What Public Works expenses are charged to the Street Landscaping and Lighting Assessment District Fund and what cost reduction alternatives are available to reduce the General Fund subsidy to the Street Landscaping and Lighting Assessment District Fund?
9 What has been the success rate of recent Fire Department recruitments? 10
What is the annual amount and the genesis of the Harbor Uplands debt service payment? 11
What are the City’s internal service fund and overhead allocations, and what policies and procedures govern them? What are the reasons for the changes in the FY 2020-21 allocations included in the proposed budget from those in the FY 2019-20 adopted budget? What is the opinion of the outside audit firm regarding the internal service funds? And what changes are recommended as part of the FY 2020-21 budget balancing?
12 Attachment A: Administrative Policy/Procedures Internal Service Fund/Overhead allocation 12A
Attachment B: Internal Service Funds Comparison 12B
Attachment C: Internal Service Fund – Reports on Audit 2019 12C
What was the feedback received from the Harbor, Library and Budget and Finance Commissions on the FY 2020-2021 Proposed Budget and the FY 2020-2025 Proposed Five-Year Capital Improvement Program? 13 Attachment A: Harbor Commission Letter to Mayor and City Council 13A ATTACHMENT 4B
Responsible Question No.
Table of Contents Page 3
Attachment B: Library Commission Letter to Mayor and City Council - 4/2/2020 and 5/6/2019 13B
What was the feedback received from the Budget and Finance Commission on the FY 2020-21 Proposed Budget and the FY 2020-2025 Proposed Five-Year Capital Improvement Program?
13A
What is the history of dredging in King Harbor and what are the plans for future dredging? 14
What is the cost of maintenance for the Harbor moorings and what has been the utilization rate? 15
What is the City’s current level of staffing for Code Enforcement functions and how does it compare to historic levels? What are the pros and cons of supplementing Code Enforcement staffing with contract services and what would be the impact on Division revenues and expenditures? 16 What is the process for increasing Street Landscaping and Lighting assessments in accordance with Proposition 218? 17
Attachment A: Prop 218 Requirements 17A
Which streets will be constructed as part of the current residential street rehabilitation and slurry seal capital improvement projects and which streets are anticipated to be included in the FY 2020-21 projects? 18 Attachment A: Preliminary List of Streets Scheduled for Improvement (2017 Report) 18A
What have been the historical internal service fund and overhead allocations to the Harbor Enterprise? 19
Attachment A: Harbor Enterprise’s ISF and Overhead for 15 years 19A Attachment B: OpenGov Harbor Enterprise ISF and Overhead Allocation Chart for 11 Years 19B
Attachment C: State Lands Commission Review 19C
What would be the cost for a fixed radar unit on Aviation Blvd. at Grant Ave. and what improvements are planned as part of the 2020-21 Traffic Calming Project if the $250,000 recommended appropriation is approved?
20 What positions are vacant or projected to be vacant in the upcoming fiscal year, and what are the budgeted costs for each of the positions? 21 ATTACHMENT 4B
Responsible Question No.
Table of Contents Page 4
How does the City’s organization structure appear before and after the position deauthorizations proposed in the Budget?
Attachment A: Listing of positions - current, projected to be vacant and recommended for deauthorization 21A
Attachment B: Organizational charts – current and proposed in recommended decision packages
21B
What organizations use City meeting rooms at no charge and what is the value of their use? 22
What are the actual line item operating expenses for each Department for the last five years? 23
Attachment A: Line item operating expenses for each Department for the last five years
23A
What has been the Library’s historical usage by day and by hour? And what is the hourly cost to keep the Library open given the library system’s level of full-time staffing in FY 2020-21 if the Decision Packages are approved?
24 Supplemental Information Related to Library Hours 24A
What impact do CalPERS rate increases have on the City’s budget? What are the projected increases in FY 2021-22 and beyond? How can the City fund the future increases and what impact will recent investment losses from COVID-19 have on future CalPERS rates?
25 Attachment A: CalPERS Investment Loss Amortization 25A What is the status of sworn officer staffing in the Police Department? 26 What is the status of the Cannabis Task Force’s work? 27 What is the status of the RCC quote? 28
Attachment A: Dispatch Feasibility Study – Redondo Beach 28A What is the cost to rehabilitate Beryl Street from Prospect Avenue to Pacific Coast Highway? 29
What is the annual core operating budget for Mayor and City Council Special Departmental Supplies and Training, Meetings, and Conferences and what have been the total expenses in these areas for the past five years? What are typical examples of annual expenditures in 30 ATTACHMENT 4B
Responsible Question No.
Table of Contents Page 5
these categories? How will the budget cuts proposed in Decision Package #7 affect the availability of funds for these uses?
What operating models have been used for the City’s Harbor Patrol Unit and what has been the number of calls for service for the past four years? What options could be implemented to allow the Harbor Patrol Unit to operate with the recommended 1/3 budget reduction?
31 Attachment A: Redondo Beach Fire Department Harbor Patrol Unit Service Calls 31A
What are the City’s General Fund probable, best and worst case financial scenarios for FY 2020-21 to FY 2024-25? 32
Attachment A: Five Year Financial Plan 32A
What expenditure budgets are included in the Self-Insurance Program Fund and what has led to the Fund’s growing negative fund balance? 33 Attachment A: Self Insurance Fund – Fund Balance History 33A
What is the City’s structural deficit and what one-time expenditure reductions and fund/reserve transfers are recommended to balance the structural shortfall? Are structural revenues anticipated to change in FY 2021-22, and will they be sufficient to cover the portion of the structural deficit covered by one-time expenditure reductions or fund transfers in FY 2020-21?
34 Attachment A: Structural Deficit Calculation 34A
What COVID-19 cost reimbursements does the City anticipate from FEMA as part of the City’s emergency response and what funding is Redondo Beach expected to receive as part of the Federal stimulus bills? 35
What has been the Police Department Maritime Enforcement Patrol Boat’s activity and calls for service for the past few years? What are the associated maintenance and operations costs for the Maritime Enforcement Unit Patrol Boat?
36 ATTACHMENT 4B
ATTACHMENT 4C
7DEOHRI&RQWHQWV3DJH
&,7<2)5('21'2%($&+
%8'*(75(63216(5(32576
)<
352326('%8'*(7
7KHIROORZLQJLVDOLVWRITXHVWLRQVUDLVHGUHJDUGLQJWKH)< 3URSRVHG%XGJHW
7KHFRUUHVSRQGLQJDQVZHUWRHDFKRIWKHVHTXHVWLRQV
WKH³%XGJHW5HVSRQVH5HSRUW´
IROORZVLQWKHVHTXHQFHUHIOHFWHG
4XHVWLRQ 1R
:KDW FRUUHFWLRQVDGMXVWPHQWV QHHG WR EH PDGH WR WKH )<
3URSRVHG%XGJHWGRFXPHQWIRULQFOXVLRQLQWKH$GRSWHG%XGJHW"
:KDWDUHWKH&LW\¶VLQWHUQDOVHUYLFHIXQGDQGRYHUKHDGDOORFDWLRQVDQG ZKDWSROLFLHVDQGSURFHGXUHVJRYHUQWKHP":KDWDUHWKHUHDVRQVIRU WKH FKDQJHV LQ WKH )<
DOORFDWLRQV LQFOXGHG LQ WKH SURSRVHG
EXGJHWIURPWKRVHLQWKH)<
DGRSWHGEXGJHW"$QGZKDWLVWKH
RSLQLRQRIWKHRXWVLGHDXGLWILUPUHJDUGLQJWKHLQWHUQDOVHUYLFHIXQGV"
$WWDFKPHQW $
$GPLQLVWUDWLYH 3ROLF\3URFHGXUHV ,QWHUQDO 6HUYLFH
)XQG2YHUKHDG$OORFDWLRQ $
$WWDFKPHQW%
,QWHUQDO6HUYLFH)XQGV&RPSDULVRQ %
$WWDFKPHQW&
,QWHUQDO6HUYLFH)XQG±5HSRUWRQ$XGLW &
:KDW KDYH EHHQ WKH KLVWRULFDO LQWHUQDO VHUYLFH IXQG DQG RYHUKHDG DOORFDWLRQVWRWKH+DUERU(QWHUSULVH"
$WWDFKPHQW$
+DUERU,6)<HDU+LVWRU\ $
$WWDFKPHQW%
2SHQ*RY&KDUWRI+DUERU(QWHUSULVH,6)$OORFDWLRQ % $WWDFKPHQW&
6WDWH/DQGV&RPPLVVLRQ5HYLHZ &
:KDWLVWKHVWDWXVRIWKHOHDVHDJUHHPHQWIRUWKHIDFLOLWLHVDW $UWHVLD
%OYG IDFLOLW\ RFFXSLHG E\ WKH &RPPXQLW\ 6HUYLFHV DQG 3ROLFH 'HSDUWPHQWV"
:KDWLVWKHVWDWXVRI7UDQVLW)XQGLQJIRU)<
"
:KDWLVWKHVWDWXVRIWKH9HWHUDQV0HPRULDO3URMHFW'RQDWLRQ)XQGDQG ZKDWDUHWKHUHPDLQLQJSURMHFWUHLPEXUVHPHQWV"
:KDWHTXLSPHQWLVVFKHGXOHGIRUUHSODFHPHQWDVUHFRPPHQGHGLQWKH ,QIRUPDWLRQ7HFKQRORJ\±(TXLSPHQW5HSODFHPHQW'HFLVLRQ3DFNDJH" ATTACHMENT 4C
5HVSRQVLEOH 4XHVWLRQ 1R
7DEOHRI&RQWHQWV3DJH
:KDWLVWKHVWDWXVRIVZRUQRIILFHUVWDIILQJLQWKH3ROLFH'HSDUWPHQW" :KDWLVWKHSURFHVVIRUFRQVLGHULQJSURSRVHGVSHFLDOHYHQWVDQGZKDW VSHFLDOHYHQWVDUHLQFOXGHGLQWKHSURSRVHGEXGJHWIRU)< "
$WWDFKPHQW$
6SHFLDO(YHQWV&DOHQGDU
$
:KDWDUHSRVVLEOHIXQGLQJRSWLRQVIRUD5LYLHUD9LOODJHSDUNLQJ JDUDJH" $WWDFKPHQW$
$GPLQ5HSRUW
IRU&LW\&RXQFLO0HHWLQJ $
:KDWZDVWKHIHHGEDFNUHFHLYHGIURPWKH3XEOLF:RUNVDQG%XGJHWDQG )LQDQFH&RPPLVVLRQVRQWKH3URSRVHG&DSLWDO,PSURYHPHQW3URJUDP DQGIURPWKH%XGJHWDQG)LQDQFHDQG/LEUDU\&RPPLVVLRQVRQWKH)<
3URSRVHG%XGJHW"
$WWDFKPHQW $
'UDIW 0LQXWHV -RLQW 3XEOLF:RUNV%XGJHW DQG )LQDQFH &RPPLVVLRQ0HHWLQJ
$
$WWDFKPHQW%
/LEUDU\&RPPLVVLRQ/HWWHUWR0D\RUDQG&LW\&RXQFLO % :KDW LV WKH SURFHVV IRU LQFUHDVLQJ 6WUHHW /DQGVFDSLQJ DQG /LJKWLQJ DVVHVVPHQWVLQDFFRUGDQFHZLWK3URSRVLWLRQ"
$WWDFKPHQW$
3URS5HTXLUHPHQWV $
:KDWZDVWKHFXOWXUDODQGHQWHUWDLQPHQWUHQWDODFWLYLW\DWWKH5%3$&LQ )<
DQGKRZKDVWKH%XVLQHVV3ODQDSSURYHGLQDIIHFWHG WKH&HQWHU¶VILVFDOLPSDFWDQGIDFLOLW\ERRNLQJSHUFHQWDJHV"
:KDW&LW\YHKLFOHVDQGHTXLSPHQWDUHVFKHGXOHGIRUUHSODFHPHQWE\WKH 3XEOLF:RUNV'HSDUWPHQWLQWKH
)LVFDO<HDUDQGZKDWPDNHV
XSWKHODUJHIXQGEDODQFHRIWKH9HKLFOH5HSODFHPHQW)XQG"
:KDW&LW\YHKLFOHVDQGHTXLSPHQWDUHVFKHGXOHGIRUUHSODFHPHQWE\WKH 3XEOLF:RUNV'HSDUWPHQWLQWKH
)LVFDO<HDUDQGZKDWPDNHV
XSWKHIXQGEDODQFHRIWKH9HKLFOH5HSODFHPHQW)XQG"
8SGDWHG
$WWDFKPHQW$
95),6))<
6FKHGXOH $
:KDW LPSURYHPHQWV KDYH EHHQ PDGH WR :LOGHUQHVV 3DUN DQG ZKDW IXQGLQJLVLQFOXGHGLQWKH)<
%XGJHWDQG&DSLWDO,PSURYHPHQW
3URJUDPIRULPSURYHPHQWSURMHFWVLQ:LOGHUQHVV3DUN"
:KDWKDVEHHQWKHKLVWRU\RI4XLPE\IHHFROOHFWLRQDQGXVH" ATTACHMENT 4C
5HVSRQVLEOH 4XHVWLRQ 1R
7DEOHRI&RQWHQWV3DJH
:KDWRSWLRQVDUHDYDLODEOHIRUIXWXUHRSHUDWLRQVRIWKH6HDVLGH/DJRRQ DQGZKDWLVWKHFRVWWRKLUHDFRQVXOWDQWWRDVVLVWZLWKWKHSUHSDUDWLRQRI DQHZIDFLOLW\PDVWHUSODQ"
$WWDFKPHQW $
&LW\ &RXQFLO $JHQGD
'LVFXVVLRQ 5HJDUGLQJ
)DFLOLW\'HVLJQ&RQFHSWVIRU5HKDELOLWDWLRQ $
$WWDFKPHQW%
&LW\&RXQFLO0LQXWHV
%
:KDWLPSDFWGR&DO3(56UDWHLQFUHDVHVKDYHRQWKH&LW\¶VEXGJHW"$QG ZKDWDUHWKHSURMHFWHGLQFUHDVHVLQ)<DQGEH\RQG"
:KDWZRXOGEHWKHSURFHVVWRLPSOHPHQWDORFDOWUDQVDFWLRQVDQGXVH WD[
$.$DGGRQVDOHVWD[
"$QGKRZPXFKDGGLWLRQDOUHYHQXHFRXOGEH
JHQHUDWHGIRUWKH*HQHUDO)XQG"
$WWDFKPHQW$
7UDQVDFWLRQDQG8VH7D[/LVWLQJ
$
$WWDFKPHQW%
(OHFWLRQ5HVXOWV
%
:KDWKDVEHHQGRQHZLWKWKHIXQGLQJUHFHLYHGWRGDWHDQGZKDWPRUH FDQEHGRQHZLWKQHZRUH[LVWLQJIXQGLQJWRDGGUHVVWKHLVVXHRISHRSOH H[SHULHQFLQJKRPHOHVVQHVVLQ5HGRQGR%HDFK"
$WWDFKPHQW$
5%7DVN)RUFH5HFRPPHQGDWLRQV $
$WWDFKPHQW%
0HDVXUH+)DFW6KHHW %
$WWDFKPHQW&
3DUWQHUVKLS5HSRUW &
$WWDFKPHQW'
<HDU3ODQWR$GGUHVV+RPHOHVVQHVV '
$WWDFKPHQW(
0HDVXUH+$SSURYHG6WUDWHJLHV (
$WWDFKPHQW)
+RPHOHVV&RXQW5HSRUWV ) $WWDFKPHQW*
&LW\$WWRUQH\'HFLVLRQ3DFNDJH *
$WWDFKPHQW+
&LW\$WWRUQH\$WWDFKPHQWWR'HFLVLRQ3DFNDJH +
$WWDFKPHQW,
3ROLFH'HSDUWPHQW'HFLVLRQ3DFNDJH ,
$WWDFKPHQW-
3ROLFH'HSDUWPHQW$WWDFKPHQWWR'HFLVLRQ3DFNDJH -
:KDWLVWKHSURMHFWHG*HQHUDO)XQGRSHUDWLQJEXGJHWIRUWKHQH[WWKUHH ILVFDO\HDUV
DVVXPLQJEHVWFDVHSUREDEOHFDVHDQGZRUVW
FDVHVFHQDULRV"
ATTACHMENT 4C
5HVSRQVLEOH 4XHVWLRQ 1R
7DEOHRI&RQWHQWV3DJH
+RZFDQWKH6WRUHIURQW,PSURYHPHQW3URJUDPEHH[SDQGHGWRLQFOXGH EXVLQHVVHVLQWKH5LYLHUD9LOODJHDQG3DFLILF&RDVW+LJKZD\&RPPHUFLDO &RUULGRU"
$WWDFKPHQW$
3URJUDP*XLGHOLQHV $
:KDW LV WKH VWDWXV RI LGHQWLI\LQJ DOWHUQDWLYH ORFDWLRQV IRU VNDWHSDUN DPHQLWLHVDQGZKDWDUHWKHSURMHFWHG FRVWVWRLPSOHPHQWRQHRUPRUH VNDWHSDUNDPHQLWLHV"
:K\DUHWUHHWULPPLQJFRVWVH[SHFWHGWRLQFUHDVHVLJQLILFDQWO\GXULQJWKH QH[WIRXU\HDUF\FOHDQGFDQDSRUWLRQRIWKHUHFRPPHQGHGLQ 'HFLVLRQ3DFNDJHEHXVHGIRUWKH&LW\¶VWUHHWULPPLQJFRQWUDFWRUWR DVVLVWZLWKWKHSODQWLQJRIQHZWUHHV"
&DQERQGVEHLVVXHGIRUVWUHHWPDLQWHQDQFHUHSDLUVDQGUHKDELOLWDWLRQ DQGUHSDLGZLWKIXQGLQJIURPWKH5RDG5HSDLUDQG$FFRXQWDELOLW\$FWRI
6HQDWH %LOO
DQG RWKHU ORFDO WUDQVSRUWDWLRQ VDOHV WD[ IXQGLQJ VWUHDPV"
$WWDFKPHQW $
0(752 %RUURZLQJ *XLGHOLQHV IRU 3URS $ 3URS & 0HDVXUH5DQG0HDVXUH0/RFDO5HWXUQ3URJUDPV±0DUFK $
:KDWZDVWKHIHHGEDFNUHFHLYHGIURPWKH+DUERU&RPPLVVLRQRQWKH)<
3URSRVHG %XGJHW DQG WKH 3URSRVHG &DSLWDO ,PSURYHPHQW 3URJUDP"
$WWDFKPHQW$
6HD/DE/HWWHU $
:KDWLVWKHFRVWEDVLVIRUWKH FXUUHQWILUHLQVSHFWLRQIHHVDQG ZKDW DUH WKH LPSOLFDWLRQV RI FKDUJLQJ D PLQXWH LQVSHFWLRQ IHH"
:KDW ZDV WKH IHHGEDFN UHFHLYHG IURP WKH %XGJHW DQG )LQDQFH &RPPLVVLRQRQWKH)<
3URSRVHG%XGJHW"
+RZPXFKLVLWHVWLPDWHGWR FRVWWRH[WHQGWKH1RUWK5HGRQGR%HDFK %LNH3DWKIURP)HOWRQ/DQHWR,QJOHZRRG$YHQXH"
:KDWDUHWKH&LW\¶VFXUUHQWYDFDQWSRVLWLRQVDQGZKHUHLVWKH&LW\LQWKH UHFUXLWPHQWSURFHVVIRUWKRVHSRVLWLRQV"
$WWDFKPHQW$
9DFDQW3RVLWLRQ/LVWLQJ $
:K\GRHVWKHOHDVHDSSURSULDWLRQLQWKH)LQDQFLDO6HUYLFHV'HSDUWPHQW DQQXDORSHUDWLQJEXGJHW UHODWHGWRWKHIRUPHU5HGHYHORSPHQW$JHQF\ 6RXWK%D\&HQWHU
*DOOHULD
UHYHQXHERQGVUHPDLQXQVSHQW"
ATTACHMENT 4C
Responsible Question No.
Table of Contents Page 5
What is the expected cost to repair, if possible, or replace the irrigation system along the Southern California Edison Right of Way in North Redondo, regrade and hydroseed the area to add new turf, apply appropriate decomposed granite walkway buffers, and maintain the improved space going forward?
32 Attachment A: Bike Path Turf Replacement Map 32A
Why does the City Treasurer consistently come under budget with regards to Maintenance and Operations of the department’s annual budget?
33 ATTACHMENT 4C
BRR #5
CITY OF REDONDO BEACH
Budget Response Report #5
June 7, 2022
Question:
What transportation services does the City operate for seniors and people with disabilities? What would be the cost to provide a Taxi/TNC Program for seniors and people with disabilities?
Response:
The City operates two Beach Cities Transit (BCT) general public fixed routes, (Line 102 and Line 109,) that seniors and people with disabilities may use to meet their transportation needs. Fares for seniors and people with disabilities are 50 cents and monthly passes are $10. City residents receive a pass subsidy and pay $5 for a monthly pass. Due to COVID-19, fare collection was suspended in March 2020 on BCT services and passengers ride free.
The City supplements transportation services to resident seniors 62+ of age and people with disabilities of Redondo Beach and Hermosa Beach with the WAVE Dial-A-Ride (WAVE) program. The WAVE is a shared-ride curb-to-curb paratransit service, that operates daily, serving destinations within Hermosa Beach, Redondo Beach and designated satellite facilities in Torrance and Kaiser Medical facilities in Manhattan Beach. The $1 fare for the WAVE has also been suspended since March 2020. The City owns 5 WAVE vehicles with ramps for safe access for wheelchair users and people who have difficulty with steps.
The WAVE operates Monday through Friday 6:00 AM to 8:30 PM, and Saturday and Sunday 8:00 AM to 8:30 PM, with reduced service hours on Thanksgiving Day, Christmas Day and New Year’s Day. Riders can request trips for the same day, advanced reservation service, subscription service and group service. Same day services can be provided within two hours of request, advance reservations can be made 24 hours ahead of requested trip time, and subscription service may be scheduled up to 7 days in advance. The majority of trips are provided during the weekday.
The 2020 Census data shows a Redondo Beach senior (65+) population of 9,376 (13.1% of total population) and 2,433 residents with disabilities under 65 years of age (3.4% of total population). There are over 1,500 Redondo Beach residents and approximately 120 Hermosa Beach residents registered for the WAVE. Approximately 12% of the eligible Redondo Beach population is registered for the WAVE and new applicants continue to register for the program.
BRR #5
Before the COVID-19 pandemic*, WAVE ridership was averaging 1,110 trips per month, and trending towards 13,500 trips to be provided in FY 2019-20. After the State Stay-At Home orders were implemented, ridership decreased significantly to approximately 404 monthly trips (5 to 8 daily) through FY 2020-21. See Table 1 for WAVE service data.
Currently, FY 2021-22 ridership is improving with an average 608 monthly trips, approximately 50% of the total trips provided pre-COVID-19. Monthly trips continue to increase, with the majority taken by single riders in the vehicle. The WAVE service can easily provide more trips with the current bus fleet. The annual operations cost of the WAVE service including fuel is $530,000 and is funded with dedicated transit funding under the Formula Allocation Procedure (FAP) and Proposition Local Return Funds.
Table 1 - WAVE Service Data
Fiscal Year 2017-18 2018-19
2019-20
July-Feb
2019-20
Mar-June 2020-21
2021-22
July-April
Service
Hours 6,731 6,864 4,436 1,817 5,838 5,435
Boardings 14,201 13,669 8,880 1,437 4,845 6,082
Avg. Monthly
Trips 1,183 1,139 1,110 359 404 608
Taxi Voucher or Transportation Network Companies (TNC) Transportation Subsidy Programs
In 2005, the City made major changes to its transportation services that implemented three fixed routes (102, 104 and 109), and cancelled the Dial-A-Taxi program for seniors and people with disabilities in order to convert to the WAVE Dial-A-Ride service.
Currently, South Bay cities have different approaches to providing supplemental transportation services for seniors and people with disabilities to their residents. Hermosa Beach supplements the WAVE service with a Dial-A-Taxi program (up to $450/mo. per person), Manhattan Beach operates a Dial-A-Ride similar to the WAVE, El Segundo changed their dial-a-ride service in mid-2021 to use a Transportation Network Company (TNC) (up to $600/mo. per person) due to issues with hiring drivers, and Torrance offers a Dial-A-Taxi program (up to $156/mo. per person).
Funding
Dedicated Local Return Proposition A funds which pay for City transportation programs are fully allocated to current transportation services and programs, bus capital expenses, and the new Transit Center location. Unless changes in existing service levels were made, the addition of a new transit program would require the use of other Local Return Funds such as Proposition C, Measure R or Measure M, or the use of General Funds. A taxi/TNC transportation subsidy program is not eligible to be funded by FAP or other state transit operations formula funding.
BRR #5
Cities with Taxi/TNC Transportation Subsidy Programs
Each city has a different program design and parameters which determine the annual costs for their individual programs. These factors include: the eligible population size, the percentage of the population that uses the service and the frequency of use by each person, the monthly value allocated per person, the amount the City pays for each trip, the maximum trip distance allowed, the amount the City pays each month per person, age and eligibility criteria, the use of a TNC or taxi companies, and the cost of the program administration using in-house staff or an outside contractor.
Table 3, “Taxi Voucher/TNC Program Parameters and General Information” (at the bottom of the report), provides brief general information and the annual budgets of the supplemental Taxi/TNC transportation subsidy programs offered by El Segundo, Hermosa Beach, Torrance, and West Hollywood. Approximately 2.4% (50) of El Segundo senior residents are registered to use the TNC program, approximately 4.43% (119) of Hermosa Beach senior residents are registered to use the taxi voucher program, approximately 6.07% (1,500) of Torrance senior residents are registered to use the DialA-Taxi program, and approximately 7% (504) of West Hollywood senior residents are registered to use the Van/TNC program.
While Hermosa Beach and El Segundo offer higher monthly trip values per person, they both have a smaller eligible population that uses the program. Torrance and West Hollywood offer a lower monthly trip value but have higher eligible populations that use their program. The design of a Redondo Beach program would determine the overall cost of the service, and staff would need to return to City Council with various program design options and detailed cost estimates before a final figure could be provided.
The Redondo Beach senior population is 9,376, and the population of people with disabilities is 2,433. The program parameters and the percentage of population that could register and use the service will determine the annual transportation cost to provide a voucher/TNC program. The budget would be based on the estimated people registered for the program, their approximate use each month, and the monthly trip value allocated to users.
Taxi/TNC Program Costs
Table 2, “Taxi/TNC Transportation Example of Estimated Costs” (below) shows annual cost estimates for a Redondo Beach program with parameters similar to the other Cities.
If the program parameters are designed similar to Hermosa Beach, El Segundo, Torrance or West Hollywood, based on projections between 4% (472) to 7% (827) of the senior and disabled population who register and regularly use the program, the total cost for trips provided would range from $566,000 per year up to $5.9 million per year. If the percentage of residents using the program is higher than 7%, the total cost for trips would be more than $6M per year.
The lower estimated program transportation cost would have a monthly trip value amount similar to West Hollywood (up to $100 per month per person) and the higher estimated BRR #5
program cost would have a monthly trip value similar to Hermosa Beach (up to $450 per month per person) or El Segundo (up to $600 per month per person).
Table 2 – Taxi/TNC Transportation Example of Estimated Costs For Trips Eligible 65+ 9,375 9,375
Eligible Disabled 2,433 2,433
Percentage and Number of Users 4% 472 7% 827
Up to 40 rides/month @ $15 value
Monthly Value per person: $600/month $3,400,992 / Year $5,952,000 / Year Up to 30 rides/month. Avg trip value: $15
Average Monthly Value per person:
$450/month
$2,550,774 / Year $4,463,802 / Year
Purchase up to 12 ride credits, @ $13
each
Monthly Value per person: $156/month
$884,256 / Year $1,547,100 / Year
Purchase up to $100 ride credits monthly
value per person
Average 10 trips/month
$200/month (with a medical condition)
$566,832 / Year $991,956 / Year
In addition, the administration of the program would need to be contracted out, as there is inadequate City personnel to oversee the program, and a Request for Proposals would need to be prepared and issued for the service. West Hollywood contracts the administration of their program and budgets approximately $153,000 per year for the contractor’s Project Manager, Customer Service Representative, Dispatcher, Call Center and application processing.
BRR #5
Table 3 -Taxi Voucher/TNC Program Parameters and General Information Category
El Segundo
Dial-a-Ride with
Lyft
Hermosa Beach
Dial-A-Taxi
Torrance
Taxi, Dial-A-Taxi
West Hollywood
TNC program with
Van
Redondo Beach
Eligibility Criteria
Resident
55+ or Disabled
Resident
62+ or Disabled
Resident
65+ or Disabled,
Income- based
fees
Resident
62+ or Disabled
Resident
62+ or Disabled
(WAVE)
Total Population Pop 16,654, Pop 19,728 Pop 147,067 Population: 36,145 Population: 71,573 Senior Population
12.5% over 65:
2,081
13.6% over 65:
2,683
16.8% over 65:
24,707
20% over 62:
7,230
13.1% over 65:
9,376
3.4% disabled:
2,433
Number of participants
Approximately 50
registered
2.4% of eligible
65+
119 registered
4.43 % of eligible
65+
1,500 registered
6.07 % of eligible
65+
504 registered
7% of eligible 65+
Assumption of S/D: 4%: 472 participants 7%: 827 participants Taxi or TNC TNC- Lyft South Bay Yellow Cab
All Yellow Taxi, Bell
Cab, South Bay
Yellow/United
Checker Cab Coop
Administration and
Service Contract
with Ambiance for
lift vehicle or TNC
(Lyft/Uber.
95% of trips are
TNC)
BRR #5
Table 3 -Taxi Voucher/TNC Program Parameters and General Information Category
El Segundo
Dial-a-Ride with
Lyft
Hermosa Beach
Dial-A-Taxi
Torrance
Taxi, Dial-A-Taxi
West Hollywood
TNC program with
Van
Redondo Beach
Monthly per person maximum value or trips provided
Up to 40 trips
@$15 value
Monthly value:
$600
Up to 30 trips
@ average $15
value
Monthly value:
$450
Purchase up to 12 ride credits @ $13 each.
Monthly Value:
$156
Purchase up to
$100 ride credits;
average 10
trips/month.
Eligible for
$200/month
(medical).
Annual Budget of trip expenses
New program. No
current data. FY21: $55,000
$1.2M – PreCOVID
$800K during
COVID
$532,345
Total Estimated Annual Cost
Up to $50,000
Excludes Staff
costs
Up to $65,000
Excludes Staff
costs
$1 million
Staff Costs:
$100,000
$648,046
Excludes staff costs
BRR #6
CITY OF REDONDO BEACH
Budget Response Report #6
June 7, 2022
Question:
What is the status of Transit Fund Revenues for FY 2022-23, and how will they be applied throughout the City?
Response:
All transportation programming is projected to be fully funded for FY 2022-23. Beach Cities Transit (BCT), as a recognized Municipal Transit Operator, receives its primary sources of funding from the Los Angeles County Metropolitan Transportation Authority (Metro) under the Countywide Formula Allocation Procedure (FAP) Transit Funds. Many elements of transit funding are voter-approved sales tax measures that provide stable sources of funding for transit activity. The use of Transit Funds and revenues are restricted to transit services and programs and are not eligible for non-transit related uses.
Due to the COVID-19 pandemic, the Federal Government approved the American Rescue Plan Act (ARPA) of 2021 which provided the Los Angeles County region $1,464,954,367 of public transit formula operating and capital grants to prevent, prepare for, and respond to COVID-19. The ARPA authorizes the City to use these funds for reimbursement of BCT operating expenses, COVID-19 related costs, transit revenue losses, and transportation funding shortfalls. The ARPA transit funding allocations will continue to support FAP and farebox funding shortfalls in FY 2022-23.
Each year Metro approves the Countywide FAP Transit Funds for Municipal Transit Operators, and Proposition A/C, Measure R and Measure M Local Return Fund Allocations in June. Metro has projected a FAP funding increase of approximately 3.3% over FY 2021-22 Local Return revenue estimates based on economic forecasting data.
BCT fare and bus pass revenues estimates are conservative, as the resumption of fare collection and BCT bus pass sales will begin later in FY 2022-23.
The City’s FAP allocation is based on Metro’s fare-unit formula that uses vehicle service miles and passenger revenues as factors to determine the proportionate share of revenue distributed to Municipal Transit Operators. Due to COVID-19, Municipal Transit Operators in the region suspended fare collection, so an average of FY 2019-20 and FY 2020-21 statistics will be used to determine the allocations for FY 2022-23.
Total available transit funds - inclusive of FAP revenues, Proposition A Local Return Funds and ARPA funds - are estimated to be approximately $5,298,785 for FY 2022-23.
The following is a summary of transit revenues for FY 2022-23:
BRR #6
Anticipated FY 2022-23 Transit Fund Revenues
Proposition A Fund Local Return Allocation Reserve Fund $ 860,674 Metro Transit FAP Funds Allocation FY 2022-23 $ 3,126,817 ARPA Federal Transit Funds $ 1,341,294
Total Estimated Transit Fund Revenue $ 5,298,785
Transportation program expenditures include programming for BCT and WAVE service operations, transit center facilities operations, management and maintenance, transit marketing, transit security, bus pass sales and subsidy programs, senior and youth recreational trips, professional consultants, personnel costs, general transportation administration, and rideshare programming related to Rule 2202 compliance (SCAQMD regulation). In addition to the regular program costs, there will be increased costs related to the additional COVID-19 safety measures that have been implemented for public and operator safety, bus operations, transit operations facility and equipment cleaning.
Additionally, Transit Fund expenditures will increase in FY 22-23 when the new transit center facility is operational due to new costs for building, landscaping and parking lot maintenance as well as increased utility usage.
Proposition A Fund Local Return funds require expenditure within three years of funding allocation. The City receives and spends approximately $1.6 million Proposition A Fund Local Return funds per year; unexpended Proposition A Fund Local Return funds are placed in the Proposition A Special Revenue Fund for future allocation. The FY 2020-21 CAFR lists a fund balance of over $2M. The City also receives funds from the South Coast Air Quality Management District (SCAQMD), the Federal Transit Administration (FTA), and California Department of Transportation (CALTrans) for capital and special project purchases.
BRR #7
CITY OF REDONDO BEACH
Budget Response Report #7
June 7, 2022
Question:
The Proposed Budget includes a Decision Package recommending funding for the restoration of facility hours at the North Branch and Main libraries. What would the North Branch Library hours of operation be if the Decision Package is approved? Response:
In FY 2020-21, due to COVID-19, facility hours at the North Branch Library were reduced by 8 hours per week, and at the Main Library by 16 hours per week. The combined reduction in hours resulted in part-time savings of approximately $170,000.
Prior to FY 2020-21, the North Branch was open to the public during the following hours:
Monday – Thursday 12:00 PM – 8:00 PM
Saturday 9:00 AM – 5:00 PM
Currently the North Branch is open to the public during the following hours:
Monday – Thursday 1:00 PM – 7:00 PM
Saturday 9:00 AM – 5:00 PM
If “Decision Package #5 – Restoration of Library Hours” is approved, the North Branch library will be open to the public during the following hours:
Monday – Thursday 11:00 AM – 7:00 PM
Saturday 9:00 AM – 5:00 PM
The realignment of operating hours from 12:00 PM – 8:00 PM to 11:00 AM – 7:00 PM is suggested to better serve patrons during times of peak demand. Restoring the 8-hour Monday through Thursday schedule at the North Branch Library costs approximately $30,000 per year in additional part-time funds.
BRR #8
CITY OF REDONDO BEACH
Budget Response Report #8
June 7, 2022
Question:
Which area library systems have gone fine free? How much annual revenue does the Redondo Beach Public Library typically collect from fines? Why do library systems choose to go fine free?
Response:
Within the last five years, library systems in the following cities and counties have gone fine free: Altadena, Burbank, County of Los Angeles, Glendale, Inglewood, Los Angeles, Monterey Park, Palmdale, Pasadena, Sierra Madre, Simi Valley, Thousand Oaks, and Ventura County.
Library systems in Azusa, Calabasas, Oxnard, and Pomona are considering going fine free in the upcoming fiscal year.
El Segundo Public Library, Palos Verdes Library District, and Santa Monica Public Library are currently fine free for juvenile materials. El Segundo and Santa Monica libraries are considering going fine free for all materials this year.
The Redondo Beach Public Library is budgeted to collect approximately $12,000 in library fines for overdue materials this fiscal year comprised of approximately $5,400 in late fines on adult materials and approximately $6,600 on juvenile materials. Total revenue from library book fines represents 0.3% of the Library’s overall budget.
Revenue from fines has decreased over the years due to reduced circulation of physical materials (and a corresponding increase in digital circulation), automatic renewal of items, and the closure of the library system during the COVID-19 pandemic.
Fine revenue since FY 2010-11 is as follows:
Fiscal Year Amount
FY 2021-22 (to date) $5,328.73
FY 2020-21 $2,751.27
FY 2019-20 $20,954.06
FY 2018-19 $41,023.31
FY 2017-18 $45,484.84
FY 2016-17 $51,648.48
BRR #8
FY 2015-16 $59,438.35
FY 2014-15 $66,106.46
FY 2013-14 $77,608.60
FY 2012-13 $79,032.76
FY 2011-12 $86,163.16
FY 2010-11 $96,021.83
TOTAL $631,561.85
If the Library were to forgive all previously issued fines (that remain uncollected), the lost revenue would total approximately $170,000. Approximately 369 Redondo Beach Public Library active cardholders are currently blocked from using the Library due to owing fines of over $10.00. The blocked cardholders represent 0.6% of total library system participants.
Library systems typically decide to go fine free because it is generally labor intensive to collect and reconcile fines and, from an equity standpoint, fines have been found to have a disproportionate impact on lower-income individuals, keeping them from fully engaging with libraries. It should be noted that fine-free library systems still bill for unreturned items, and a certain number of overdue items prevent a patron from checking out additional materials.
BRR #9
CITY OF REDONDO BEACH
Budget Response Report #9
June 7, 2022
Questions:
How does the City’s Information Technology Equipment Replacement Program work and what equipment is recommended for replacement in FY 2022-23, per Decision Package #25 - Information Technology Equipment Replacement?
Response:
The City’s Information Technology Equipment Replacement Program was established in FY 2005-06 as a way to keep the City’s technological infrastructure up to date and to minimize failures and workplace disruption due to unreliable, outdated or failing computer hardware and software. The City had experienced considerable disruption due to old technology from the time it started implementing non-mainframe-based solutions around 1993 up to 2006. The replacement program was funded to combat these disruptions and to proactively maintain a mission critical system. Since the program’s implementation, the City has enjoyed a very robust and reliable technological infrastructure.
During each mid-year budget review, IT staff evaluate the equipment replacement schedule and add or remove equipment based on current needs and circumstances. IT staff may also extend or reduce the lifespan based on the condition of the equipment or pending changes in the technological cycle. For example, in FY 2007-08 instead of replacing 21 computer servers, the City funded the implementation of a virtual server infrastructure. At times, equipment is replaced for other reasons than simply reaching the end of its lifespan, such as technological advances or the inability of equipment to run current software.
The spreadsheet used to manage the IT Replacement Schedule was created by Financial Services staff and provided to the IT Department. The schedule is based on the estimated useful lives of the equipment across a 10-year rolling period. The replacement value is calculated using a 3.5% compounded rate against the purchase price of the equipment, software and services for the respective number of life span years assigned. Examples are provided in the below table:
BRR #9
Equipment Purchase
Price
Life Span
Years
Replacement Value
Full Life (3.5%
compounded rate)
Annual Rental
Network Edge
Equipment $600,000 7 $971,217 $138,745
Network Core
Routers $100,000 7 $161,869 $23,124
Each fiscal year, an IT Internal Service Annual Rental charge is assessed to each department for the eventual replacement of technological equipment. These charges are independent of the IT Internal Service Fund charges for personnel and maintenance and operations. The number of departmental computers, computer-related equipment, telephones, and telecom-related items is used to allocate equipment that cannot be identified directly to a department. The total yearly charge (beginning in FY 2006-07) has ranged from approximately $420,000 to $736,000 depending on the equipment included in the replacement schedule each year. The charge has declined over time as we move from capital equipment expenses to subscription-based services. The table below contains past departmental annual rental charges:
Fiscal Year Amount
FY 2022-23 $496,711
FY 2021-22 $512,969
FY 2020-21 $0
FY 2019-20 $477,706
FY 2018-19 $462,563
FY 2017-18 $462,508
FY 2016-17 $441,795
FY 2015-16 $488,259
FY 2014-15 $495,432
FY 2013-14 $477,234
FY 2012-13 $494,909
FY 2011-12 $617,354
FY 2010-11 $588,166
FY 2009-10 $636,403
FY 2008-09 $736,905
FY 2007-08 $736,905
FY 2006-07 $420,200
BRR #9
For FY 2020-21, due to budget restrictions, staff extended the life of equipment by one year and suspended the departmental rental charges. This extended the lifespan and replacement cycle of all equipment by one year and saved the General Fund $454,748 and other funds $95,158. The end result was a revenue reduction to the Information Technology Fund of $548,906, representing approximately a 19% reduction in the IT budget.
FY 2022-23 Equipment Replacement:
Each fiscal year, a budget Decision Package is recommended for Council consideration to allocate funds from the IT Replacement Fund to the IT Internal Service Fund for equipment scheduled for replacement. Equipment is only recommended for replacement when it is fully funded - the funds to pay for the FY 2022-23 IT replacement program are currently fully accrued in the IT Replacement Fund.
The amount requested to be allocated each fiscal year depends on which equipment is scheduled to be replaced. It can be more or less than the annual departmental rental charge. Previous years allocations approved by City Council from the IT Equipment Replacement Fund to the IT Internal Service Fund are as follows:
Fiscal Year Amount
FY 2022-23 (Proposed) $211,245
FY 2021-22 $432,695
FY 2020-21 $1,133,086
FY 2019-20 $234,385
FY 2018-19 $427,712
FY 2017-18 $105,710
FY 2016-17 $543,700
FY 2015-16 $246,533
FY 2014-15 $220,471
FY 2013-14 $985,291
FY 2012-13 $550,298
FY 2011-12 $327,000
FY 2010-11 $136,743
FY 2009-10 $201,875
FY 2008-09 $436,452
FY 2007-08 $1,101,301
FY 2006-07 $441,600
BRR #9
Following are some examples of enterprise wide mission critical systems that have benefitted from the replacement program:
x Data Network Infrastructure - (2006, 2013, 2021)
x Telecommunications System – (2006, 2012, 2021)
x Public Safety Computer Aided Dispatch and Records Management Systems (2005, 2010, 2015)
x Network perimeter firewalls – (2010, 2016)
x Network Equipment Battery Backup – (2011, 2015, 2019) x High speed document imaging scanners – (2010, 2014, 2016, 2019) An appropriation from the IT Equipment Replacement Fund (fully funded for FY 2022-23) to the Information Technology Internal Service Fund (Decision Package #25) is necessary to implement the FY 2022-23 IT replacement program.
In FY 2020-21, in light of the City’s financial situation, staff recommended that only City network equipment be replaced as it had reached end-of-life and was showing some signs of instability (noisy fans, failures, unexpected behavior, etc.). All other equipment scheduled for replacement was deferred to FY 2021-22 and as such those funds remained in the IT Equipment Replacement Fund.
Below is a listing of technological equipment scheduled for replacement in FY 2022-23 and the estimated costs that make up the requested $211,245:
Information Technology:
Replacement Item Amount
Enterprise Perimeter Firewall
x Acquired in 2016. Equipment will be ~6 years old upon replacement. Protects City network through a host of security features. Newer, more advanced model now available.
$43,024
Copy Center Paper Folder.
x Acquired in 2017. Equipment will be ~5 years old upon replacement.
$7,053
Copy Center Tape Binder
x Acquired in 2017. Equipment will be ~ 5 years old upon replacement.
$7,053
Identification Card printer and Camera
x Acquired in 2018. Equipment will be ~4 years old upon replacement. Used to generate and print City employee
identification cards.
$7,459
BRR #9
Fire Department:
Replacement Item Amount
Portable Smart Board
x Acquired in 2016. Equipment will be ~6 years old upon replacement.
$9,834
Fire Vehicle Modem
x Acquired in 2017. Equipment will be ~5 years old upon replacement. Modems connect Fire vehicles to the City
network.
$14,252
Engineering:
Replacement Item Amount
Conference Room Projector
x Acquired in 2015. Equipment will be ~5 years old upon replacement.
$2,613
City Clerk:
Replacement Item Amount
High Speed Document Scanners – 3 Ea.
x Acquired in 2018. Equipment will be ~4 years old upon replacement. Used to scan documents into the Laserfiche document imaging system.
$ 34,353
City Attorney:
Replacement Item Amount
Document Scanner
x Acquired in 2018. Equipment will be ~4 years old upon replacement.
$6,584
Library:
Replacement Item Amount
Receipt Printers
x Acquired in 2018. Equipment will be ~4 years old upon replacement.
$6,584
BRR #9
Police Department:
Replacement Item Amount
High Speed Document Scanners
x Acquired in 2018. Equipment will be ~4 years old upon replacement. Used to scan documents in to the Laserfiche document imaging system.
$22,902
Briefing Room Projector
x Acquired in 2016. Equipment will be ~6 years old upon replacement.
$7,376
Police Vehicle Modems
x Acquired in 2017. Equipment will be ~5 years old upon replacement. Used to connect Police patrol vehicles to the City network.
$33,255
Video Surveillance View Stations
x Acquired in 2019. Equipment will be ~4 years old upon replacement. Used by PD staff to view and monitor surveillance video.
$8,906
BRR #10
CITY OF REDONDO BEACH
Budget Response Report #10
June 7, 2022
Question:
What is the cost for adding shade structures over existing park play equipment similar to what was constructed at Perry Park?
Response:
The existing shade umbrellas used at Perry Park, as shown below, are attached elements of the play structures. Due to structural safety and liability concerns it is not practical to install this type of shade structure on existing play equipment at other parks post construction.
Perry Park Umbrella Shade Feature
The preferred method to increase shade over existing play equipment is to add separate freestanding structures. The two most common types of freestanding shade structures are canopy style and sail style, as pictured below.
BRR #10
The cost for canopy style structures ranges from $7,000 to $50,000, depending on the size and height of the structure. The most popular size, a 20’ x 20’ structure with an eightfoot entry height, costs roughly $10,000. Installation costs, which includes concrete footings, support columns and associated hardware, vary significantly depending on the size of the play structure and the type of surface on which it sits. Installation costs range from $15,000 to $50,000. The cost to install a 20’ x 20’ structure is about $18,000.
Canopy Style Shade Structure
Sail style structures are more expensive than canopy structures, with costs ranging from $10,000 to $75,000. The cost for a structure with 20-foot sides is about $18,000.
Installation costs are similar to that of canopy style structures.
BRR #10
Sail Style Shade Structure
The Public Works Department’s annual operating budget does not include funding for the installation of shade structures at existing play equipment facilities. If the City Council would like to install additional shade structures, it is recommended that the park sites be identified and specific project funding be appropriated as part of the Capital Improvement Program.
BRR #11
CITY OF REDONDO BEACH
Budget Response Report #11
June 7, 2022
Question:
What is the cost to purchase and install radar feedback signs that collect vehicle speed data?
Response:
The Public Works Department has deployed a number of static radar feedback (RFB) signs and is in the process of obtaining more to improve driver awareness, calm traffic, and reduce vehicle speeds. These “static” RFB signs are in addition to the portable signs mounted on trailers used by the Police Department.
In the current Public Works inventory, the RFB signs provide an instantaneous display of the speed of an approaching vehicle but do not track or retain data. Newer sign technology can support remote monitoring and data collection from the RFB signs, including a cloud-based data mining and reporting platform. These RFB signs communicate via on-going cellular service, which is bundled upfront as part of the purchase. Solar powered options also exist to simplify placement compatibility.
The price for the sign (hardware), software and cellular subscriptions, with a 10-year maintenance term has a one-time cost of approximately $7,500 per sign unit. Most locations utilize two RFB signs, with one pointed in each travel direction. The installations have been performed by City crews, but could be contracted out in the future to avoid impacts on staff resources. Installation costs vary depending on whether an existing pole can be used for mounting or a separate pole must be purchased and installed at the desired location. Cost for installation and materials is estimated below for four scenarios, based on current market pricing.
Existing Pole Installation / Contractor New Pole Installation / Contractor RFB Sign $7,500 RFB Sign $7,500
Labor $1,000 Labor $4,000
Materials (pole, base, etc.) $2,500
Total $8,500 Total $14,000
Existing Pole Installation / City Crews New Pole Installation / City Crews RFB Sign $7,500 RFB Sign $7,500
Labor $300 Labor $1000
Materials (pole, base, etc.) $2,500
Total $7,800 Total $11,000
BRR #12
CITY OF REDONDO BEACH
Budget Response Report #12
June 7, 2022
Question:
What would be the cost to install a dog run in Czuleger Park? Response:
Most areas of Czuleger Park are not suitable for a dog run because the terrain is too sloped and do not allow for ADA compliance. However, there is a suitable flat area in the northwest corner of the park, outlined in red below.
BRR #12
This area is ADA accessible, as it is serviced by the elevator in the Plaza Parking Structure. It is also the furthest location from residences which would ease potential noise concern. A dog run of approximately 3,600 square feet could be created in this area.
The costs would be as follows:
Install perimeter fencing: $22,000
Install gate and holding area: $1,000
Install dog waste bag dispensers: $75
Install wood chips: $750
Install signage: $500
General site improvements: $5,000
Irrigation system modifications: $2,000
15% contingency $4,700
Total $36,025
It should be noted that the dog run would also create on-going costs for maintenance and operation. The Public Works Department estimates an annual cost of roughly $15,000 for trash and waste removal, restocking waste bags, replacing wood chips and other necessary maintenance.
The creation of similar dog runs in other parks throughout town have been popular and widely used by members of the community without greenspace to safely run their dogs in or around residences.
BRR #13
CITY OF REDONDO BEACH
Budget Response Report #13
June 7, 2022
Question:
What special events were designated as “Signature Events” and received City subsidy prior to the COVID related budget reductions in Fiscal Year 2020-21? What is the City’s special event review and approval process? What are special event organizers charged for City expenses?
Response:
Prior to FY 2020-21, special events occurring on public property fell into one of three categories: (1) Signature Events, (2) City-Initiated Events; and (3) Other Special Events.
While these three categories are collectively referred to as “Special Events,” there are important distinctions between the three categories as noted below.
Signature Events – Prior to FY 2020-21, there were six designated Signature Events that received City funding and/or staff support. The list of Signature Events and the degree of support was reviewed annually by the City Council as part of the budget process. In addition to subsidizing staff costs in identified annual amounts, the City waived rental, permit, and parking fees for these events.
Prior to FY 2020-21, the following event subsidies were in place:
Signature Events General Fund Tidelands Uplands
Super Bowl 10K Run/Walk $20,000 $ - $ -
Lobster Festival $ 5,500 - -
Springfest Carnival $ 8,190 - -
Riviera Village Summer Festival $ 2,500 - -
Riviera Village Holiday Stroll $ 2,500 - -
4th of July City Fireworks* $ - 4,200 16,800
*The City’s annual Fireworks event used to be hosted by a contract partner that collected all event fees and covered all costs beyond the identified subsidy. The City’s subsidy was offset by retained parking fees.
It should be noted that there were two additional special events, not designated as “Signature”, that received a cost waiver from the City, the King Harbor Sea Fair ($2,000) and the King Harbor Boat Parade ($2,000).
As a budget savings measure in FY 2020-21, the City eliminated signature event subsidies and required all event sponsors to fully cover event costs. As a result of this BRR #13
policy change and due to COVID related group gathering restrictions and a lack of anticipated participation, several special events did not occur in FY’s 2020-22 including three historic signature events; the Riviera Village Summer Festival, the Lobster Festival, and the Springfest Carnival.
Other Special Events – All other special events are subject to the City’s review policy for special events as outlined below. These special events are required to pay all requisite fees and to cover any resulting costs to the City. On an annual basis, the Community Services Department prepares an event calendar which lists these special events with dates and locations to be published on the City’s website. Some of these events were not held in FY 2021-22, including the South Bay Greek Festival and the St. Patrick’s Day 5k Run.
City-Initiated Events – Additionally, there are a limited number of City-Initiated events which are sponsored and funded through City department budgets as part of their regular work program including the Community Open House, Volunteer Appreciation, Egg Hunt, and the Senior Health Fair. These events are largely self-contained and do not create impacts causing concern to residents or businesses and are funded through annual department operating budgets.
Special Event Review/Approval Process – The Community Services Department receives special event applications and coordinates the interdepartmental review of all special events. The process flows as follows:
1. Upon receipt of the completed application, Community Services staff will distribute an electronic copy of the completed Special Event Application to the Special Events Review Committee comprised of the following individuals:
a. Traffic Engineer
b. Police Chief or designee
c. Fire Chief or designee
d. Public Works Director or designee
e. RCS Director or designee
f. Risk Manager
g. Waterfront & Economic Development Director or designee h. Community Development Director or designee
2. Requirements and cost estimates concerning the special event application are the collected via e-mail. In the event of significant concerns, a meeting of the above individuals is scheduled to review the application. In some cases, there is a pre-meeting of the Special Events Review Committee prior to the meeting held with the event promoter.
3. The event plan is modified/finalized based on direction from the Review Committee and the event is then executed with the identified supporting City resources.
BRR #13
4. Following the event, each impacted City department submits final charges for event support. Charges vary based on the size and scope of the event and typically include Public Safety staffing, Public Works support, Traffic Control Plan and Building Safety Inspections, and associated permit fees.
City Charges for Special Events – Invoices for each of the past year’s events have been included as attachments to the BRR to illustrate typical City event charges. The attached invoices include the following special events:
x July 4 5K Run/Walk
x 4th of July Fireworks & Festival for a Fun 21
x Beach Life Festival – September
x LA Kings 5K/Walk
x Halloween Trick or Treat Stroll
x Riviera Village Holiday Stroll
x Redondo Beach Superbowl Sunday 10K
ATTACHMENT 13A
ATTACHMENT 13A
ATTACHMENT 13A
ATTACHMENT 13A
ATTACHMENT 13A
ATTACHMENT 13A
ATTACHMENT 13A
BRR #14
CITY OF REDONDO BEACH
Budget Response Report #14
June 7, 2022
Question:
What is the Fire Department doing to address training needs? Response:
The recent assessment of the Fire Department identified inconsistent training as one of the principal concerns of Redondo Beach Firefighters. Inconsistent training is defined by the organization as the varied delivery and practice of the core firefighter skills used by members during emergency response. The Fire Department has developed an ambitious multifaceted approach to resolve this concern. These strategies include developing a comprehensive Training Matrix (see attached), assigning a Fire Division Chief to training as their principal responsibility, and hiring subject matter experts to deliver curriculum to all personnel. Decision Package #’s 18 and 53 support resolving these inconsistencies and providing top level training for all members of the department.
COMPREHENSIVE TRAINING MATRIX
Historically the Fire Department has relied on quarterly training exercises to maintain competency. This system has not grown as the demands for Fire Department services have expanded. This has resulted in inconsistencies between shifts as members work on different skills in varying ways. This variance is a challenge for employees as they work with different supervisors. This spring, the Fire Department assigned personnel to develop a Training Matrix in response to this identified weakness. Three months of staff work were committed to developing a comprehensive plan to satisfy the following benchmarks:
x Capture the Fire Department core competencies
x Provide a unified, systematic skill delivery that develops similar emergency operations x Create a simple and easy to use plan
x Implement a training cycle that is coordinated with other regional Fire Departments x Provide a paperless system that documents all members completing training x Obtain buy-in and contribution from all members
x Develop skills that could be delivered by different members of the organization with similar results
The Training Matrix is currently being beta tested with several modules. The complete application of the plan is anticipated by the start of FY 2022-23. The Training Matrix covers a two-year cycle to capture all of the required Fire Department core competencies.
Appendix A is a copy of the Redondo Beach Training Matrix with Quick Response (QR) code access. Each month introduces operational competencies with related skills sheets and reference material for review. Over 240 hours of training are captured in the Training BRR #14
Matrix with an additional 36 hours of emergency medical continuing education. The primary focus of all training is the hands-on application of identified critical job performance competencies. The Training Matrix also incorporates a digital library with videos developed by the Redondo Beach Fire Department that highlight operational best practices.
TRAINING DIVISION CHIEF
Inconsistent training was also the product of different Fire Division Chiefs and Captains taking on the responsibility of training oversight. This process invariable created widely diverse practices and frustration among team members. In June, an acting Division Chief position was assigned training as their primary area of responsibility. This Fire Division Chief is charged with implementing the Training Matrix, standardizing the department practices, and updating the methods used to document training. As part of the executive staff the Division Chief position has the influence and organizational oversight to completely overhaul the department training process. The Training Division Chief also has the ability to impact change at the highest levels of the organization. The Fire Department training records also require a significant overhaul. Since the Fire Department lost the Training Officer position in 2008, training files have been irregularly updated and completed. Direction from the Training Fire Division Chief, with support from administrative staff, will confirm that training is delivered effectively and then properly documented.
SUBJECT MATTER EXPERTS AND TRAINING RESOURCES
The Redondo Beach Fire Department is an “all-risk” response agency, meaning that the agency is accountable for any emergency that our community may face. Emergency response competencies that are high-risk but low frequency require expertise found outside of the agency. Examples of these types of responses include hazardous materials, wildfires, technical rescues, and automobile extrications. Decision Package # 53 supports the hiring of experts from across the country to teach our Firefighters the best practices to mitigate high-risk emergencies. Using outside instructors also allows the Fire Department to have the same material delivered by experts to all of our Firefighters, reducing inconsistencies.
An example of this type of specialized high-risk training is our Hazardous Materials IQ course presented by the experts from Federal Resource. These instructors work for the Miami-Dade Fire Department and travel across the country to teach Redondo Beach Firefighters. They have developed a system and curriculum that allows our Firefighters to rapidly identify the risks associated with any hazardous material spill and, if we can, rescue exposed victims.
A second component to improve training consistency is having the training resources to support hands-on practice. DP # 18 supports the Fire Department hiring outside experts and purchasing the props to support that training. Currently one of our high-risk Fire Department operations is ventilation, where our Ladder Truck Firefighters make access to the roof of a building to release the smoke from inside the structure. This operation allows firefighters inside of the structure to locate victims and determine where the fire is burning. This skill requires constant practice to safely and effectively master. Currently our firefighters travel to Manhattan Beach or the El Camino Fire Academy to use their ventilation training prop.
BRR #14
This limits their access to practice and developing ventilation skills is a challenge due to the infrequent exposure. DP # 18 supports the Fire Department building a ventilation training prop in Redondo Beach. This will allow firefighters to frequently practice a skill that can make a critical difference in rescuing victims in a fire.
TRAINING MATRIX
2023-2024
“Training Mission
Statement Here”
ATTACHMENT 14A
TABLE OF CONTENTS
1.Cover Sheet
2. Introduction
3.Table of Training Disciplines
4. QR Code to Master Schedule & QR Code
to Master Online Library
5. Master Schedule for 2022,2023,2024
6. Drill Evolution Template
7.Skill Sheet Evolution Template
8. Monthly Training Record
ATTACHMENT 14A
To do as a group/presentation:
1. Develop Training Mission Statement
2. Understand Master Schedule and Rx
Training
3. Evolution Template
4. Skill Sheet Template
5. APS and Sending Recorded Training to
Training Department
ATTACHMENT 14A
Introduction
The Redondo Beach Fire Department is striving to increase the competency during emergency response while simultaneously increasing the safety of personnel. We are also always seeking to improve our customer service for the citizens, business partners, and visitors of Redondo Beach. As such, a thorough training program is being built to ensure standardized, consistent training for all members of the fire department. The purpose of this document is to provide systematic training to improve the efficiency and reliability of emergency response.
This training document will provide The Redondo Beach Fire Department with a detailed, multi-year training plan. This training plan is developed to create a safe, positive, and effective training environment. The training topics will enable all personnel to build upon foundational skills and to learn new and innovative firefighting concepts and techniques.
The structure and content of this plan strives to provide the agency with a clear and concise training guide. Utilizing this guide will provide weekly, monthly, quarterly and annual training topics. The goal will be to follow this guide to meet the needed training topics set forth in this plan. Flexibility and revision will be expected as new training opportunities and agency and community needs arise or new events develop.
Personnel will be encouraged to promote personal training accountability, innovative thinking, and teamwork during all training activities. Reviewing training topics and skills prior to the training drills can also improve the training efficiency. It is imperative to create a new culture and mindset when it comes to training. Those cultural changes should include:
x providing training topics in advance
x providing resources to prepare personnel prior to topics x encouraging positive dialogue, accepting that errors occur, and learning from them as an agency
Each discipline will be covered systematically throughout the training year. Topics will be loaded into the training matrix, so all crews can follow a consistent training schedule. The material covered will be developed by the captain assigned to that particular discipline.
Station captains will ensure all training is provided to their respected shifts each month.
Skill sheets, reference material, and video links will be uploaded as they are developed.
This information will help personnel review material prior to training. Training records will be logged throughout the month to ensure proper record keeping and accountability.
Introduction
The Redondo Beach Fire Department is striving to increase the competency during emergencyresponse while simultaneously increasing the safety ofpersonnel. We are also always seeking to improve our customer service for the citizens, business partners, and visitors ofRedondo Beach. As such, a thoroughtraining program is being built to ensure standardized, consistent training for all members of the fire department. The purposeof this document is to provide systematic training to improve the efficiency and reliability of emergency response.
This training document will provide The Redondo Beach Fire Department withadetailed, multi-year training plan. This training plan is developed to createa safe, positive,and effective training environment. The training topics will enable all personnel to build upon foundational skills and to learn new and innovative firefightingconcepts and techniques.
The structure andcontent of this plan strives to provide the agency with a clear and concise training guide. Utilizingthis guide will provide weekly, monthly, quarterly and annual training topics. Thegoal will be tofollow this guideto meetthe needed training topics set forth in this plan. Flexibility and revision will beexpected as new training opportunities and agency and community needs arise or new events develop.
Personnel will be encouraged to promote personal training accountability, innovative thinking, andteamwork during all training activities. Reviewing training topics and skills prior to the training drills can also improve the training efficiency. It is imperative to create a new culture and mindset when it comes to training. Those cultural changes should include:
x providing training topics in advance
x providing resources to prepare personnel prior to topics x encouragingpositive dialogue,accepting that errorsoccur, and learning from them as an agency
Each discipline will be covered systematically throughout thetraining year. Topics will be loaded into thetraining matrix, so all crews can follow a consistent training schedule. The material covered will be developed by the captain assigned to that particular discipline.
Station captains will ensure all training is provided to their respected shifts each month.
Skill sheets, reference material, and video links will be uploaded as they are developed.
This information will help personnel reviewmaterial prior to training. Training records will be logged throughout the month to ensure proper record keeping and accountability.
ATTACHMENT 14A
Overview of training discipline are listed below:
Engine Company Operations Quarterly HOURS TBD
Truck Company Operations Quarterly HOURS TBD
RIC/VEIS/Search and Rescue Bi-Annually HOURS TBD
HAZMAT Annually HOURS TBD
Technical Rescue Bi-Annually HOURS TBD
Officer Development Bi-Annually HOURS TBD
Multi-Causality Incidents Annually HOURS TBD
Apparatus Operator Quarterly HOURS TBD
Multi-Company Quarterly HOURS TBD
Rapid Fire Monthly HOURS TBD
EMS Continuing Education Monthly HOURS TBD
Boat Operations Monthly HOURS TBD
APS Online Topics Monthly HOURS TBD
Overview of training discipline are listed below:
Engine Company Operations Quarterly HOURSTBD
Truck Company Operations Quarterly HOURS TBD
RIC/VEIS/Searchand Rescue Bi-Annually HOURSTBD
HAZMAT Annually HOURS TBD
TechnicalRescue Bi-Annually HOURS TBD
OfficerDevelopment Bi-Annually HOURS TBD
Multi-CausalityIncidents Annually HOURS TBD
Apparatus Operator Quarterly HOURS TBD
Multi-Company QuarterlyHOURS TBD
Rapid Fire Monthly HOURS TBD
EMSContinuing Education Monthly HOURSTBD
Boat Operations Monthly HOURS TBD
APS Online Topics Monthly HOURS TBD
ATTACHMENT 14A
REDONDO BEACH FIRE DEPARTMENT
202
Redondo Beach Fire Department
401 South Broadway
Redondo Beach, California 90277
Ph: (310) 318-0663
Fax : (310) 376-3407
www.Redondo.org
REDONDO BEACH FIRE DEPARTMENT
7 5 $ , 1 , 1 * 6 & + ( ' 8 / ( $ 1 ' 6 . , / / 6 + ( ( 7 6 5 % ) ' 7 5 $ , 1 , 1 * 6 & + ( ' 8 / (
5 % ) ' 6 . , / / 6 + ( ( 7 6
: : : 5 ( ' 2 1 ' 2 2 5 * 5 % ) ' 7 5 $ , 1 , 1 * : : : 5 ( ' 2 1 ' 2 2 5 * 5 % ) ' 7 5 $ , 1 , 1 * ' 2 & 6
REDONDO BEACH FIRE DEPARTMENT
202
Redondo Beach Fire Department
401 South Broadway
Redondo Beach, California 90277
Ph: (310) 318-0663
Fax : (310) 376-3407
www.Redondo.org
REDONDO BEACH FIRE DEPARTMENT
7 5 $ , 1 , 1 * 6 & + ( ' 8 / ( $ 1 ' 6 . , / / 6 + ( ( 7 6 5 % ) ' 7 5 $ , 1 , 1 * 6 & + ( ' 8 / (
5 % ) ' 6 . , / / 6 + ( ( 7 6
: : : 5 ( ' 2 1 ' 2 2 5 * 5 % ) ' 7 5 $ , 1 , 1 * : : : 5 ( ' 2 1 ' 2 2 5 * 5 % ) ' 7 5 $ , 1 , 1 * ' 2 & 6 ATTACHMENT 14A
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER ENGINE OPS TRUCK OPS R.I.C. VEIS S&R ENGINE WILDLAND TRUCK ENGINE OPS TRUCK OPS R.I.C. VEIS ENGINE TRUCK MAKE UP OFFICER HAZMAT TECH RESCUE PUMP OPERATOR AERIAL OPERATOR MCI OFFICER Water Rescue TECH RESCUE PUMP OPERATOR AERIAL OPERATOR MAKE UP
EMS EMS EMS EMS EMS EMS EMS EMS EMS EMS EMS EMS
RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE
BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS Q1 MULTI-CO.DRILL Q2 MULTI-CO.DRILL Q3 MULTI-CO-DRILL Q4-MULTI-CO-DRILL REDONDO BEACH FIRE DEPARTMENT TRAINING SCHEDULE 2022
UARY R MACH APRIL MAY JUNE JULY AUGUST SEPTEMBER CT O OBER NOVEMBER K OPS R.I.C. VEISS&R ENGINE WILDLAND TRUCK ENGINE OPS TRUCKOPS R.I.C. VEIS ENGINE TRUCK MAT TECH RESCUE PUMP OPERATOR AERIAL OPERATOR MCI OFFICER Water Rescue TECH RESCUE PUMP OPERATOR AERIAL OPERA
S EMS EMS EMS EMS EMS EMS EMS EMS EMS
FIRE RAPID FIRE RAPID FIRE RAPIDFIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE
OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS Q1 MULTI-CO.DRILL Q2 UL MTI-CO. RI DLL Q3MULTI-CO-DRILL
REDONDO BEAC
H FIRE
DEP
ARTM
EN
T TRAINING
SCHEDUL
E 2022
ATTACHMENT 14A
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER ENGINE OPS TRUCK OPS R.I.C. VEIS S&R ENGINE WILDLAND TRUCK ENGINE OPS TRUCK OPS R.I.C. VEIS ENGINE TRUCK MAKE UP OFFICER HAZMAT TECH RESCUE PUMP OPERATOR AERIAL OPERATOR MCI/Acitive OFFICER Water Rescue TECH RESCUE PUMP OPERATOR AERIAL OPERATOR MAKE UP
EMS EMS EMS EMS EMS EMS EMS EMS EMS EMS EMS EMS
RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE
BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS Q1 MULTI-CO.DRILL Q2 MULTI-CO.DRILL Q3 MULTI-CO-DRILL Q4-MULTI-CO-DRILL REDONDO BEACH FIRE DEPARTMENT TRAINING SCHEDULE 2023
Q3MULTI-CO-DRILL Q2 UL MTI-CO. RI DLL Q1 MULTI-CO.DRILL
BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS OPS
RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPIDFIRE RAPID FIRE RAPID FIRE FIRE
EMS EMS EMS EMS EMS EMS EMS EMS EMS S
AERIAL OPERA PUMP OPERATOR TECH RESCUE Water Rescue OFFICER MCI/Acitive AERIAL OPERATOR PUMP OPERATOR TECH RESCUE MAT TRUCK ENGINE R.I.C. VEIS TRUCKOPS ENGINE OPS TRUCK WILDLAND ENGINE R.I.C. VEISS&R K OPS
NOVEMBER CT O OBER SEPTEMBER
AUGUST JULY JUNE MAY APRIL R MACH UARY
REDONDO BEAC
H FIRE
DEP
ARTM
EN
T TRAINING
SCHEDUL
E 2023
ATTACHMENT 14A
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER ENGINE OPS TRUCK OPS R.I.C. VEIS S&R ENGINE WILDLAND TRUCK ENGINE OPS TRUCK OPS R.I.C. VEIS ENGINE TRUCK MAKE UP OFFICER HAZMAT TECH RESCUE PUMP OPERATOR AERIAL OPERATOR MCI OFFICER Water Rescue TECH RESCUE PUMP OPERATOR AERIAL OPERATOR MAKE UP
EMS EMS EMS EMS EMS EMS EMS EMS EMS EMS EMS EMS
RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE
BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS Q1 MULTI-CO.DRILL Q2 MULTI-CO.DRILL Q3 MULTI-CO-DRILL Q4-MULTI-CO-DRILL REDONDO BEACH FIRE DEPARTMENT TRAINING SCHEDULE 2024
UARY R MACH APRIL MAY JUNE JULY AUGUST SEPTEMBER CT O OBER NOVEMBER K OPS R.I.C. VEISS&R ENGINE WILDLAND TRUCK ENGINE OPS TRUCKOPS R.I.C. VEIS ENGINE TRUCK MAT TECH RESCUE PUMP OPERATOR AERIAL OPERATOR MCI OFFICER Water Rescue TECH RESCUE PUMP OPERATOR AERIAL OPERA
S EMS EMS EMS EMS EMS EMS EMS EMS EMS
FIRE RAPID FIRE RAPID FIRE RAPIDFIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE RAPID FIRE
OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS BOAT OPS Q1 MULTI-CO.DRILL Q2 UL MTI-CO. RI DLL Q3MULTI-CO-DRILL
REDONDO BEAC
H FIRE
DEP
ARTM
EN
T TRAINING
SCHEDUL
E 2024
ATTACHMENT 14A
Candidate/Firefighter
Evaluator/Instructor
ĂƚĞ
Evolution Performed:
Equipment needed:
Performance Objective
Evolution/Skill Steps
Candidate/Firefighter
Evaluator/Instructor
ĂƚĞ
Evolution Performed:
Equipment needed:
Performance Objective
Evolution/Skill Steps
SMITH
JOHNSON
05/03/2022
AUTO EXTRICATION
TRUCK 61 & HOLMATRO TOOLS
CUT DOORS OFF VEHICLE
1. ESTABLISH TOOL CASH WITH HOLMATRO AND NEW HURST JAWS OF LIFE
2. ASSESS DAMAGE OF VEHICLE AND DEVELOP A JAWS OF LIFE PLAN
3. PROVIDE PATIENT CARE ONCE VEHICLE IS STABILIZED
4. UTLILIZE RESUCE 42'S FOR EXTRA STABILIZATION
5. UTILIZE JAWS OF LIFE TO CUT DOORS OFF VEHICLE
6. CONTINUE PATIENT CARE AND TRANSPORT PATIENT WITH RESCUE 61 TO
HOSPITAL
7. CLEAN UP DEBRIS AND OIL FROM VEHICLE
8. RETURN EQUIPMENT TO IN SERVICE CRITERIA
ATTACHMENT 14A
ATTACHMENT 14A
Additional Notes:
Critical Failures/Notes:
New Changes:
Feedback :
Additional Notes:
Critical Failures/Notes:
New Changes:
Feedback :
NEW HURST TOOLS WORKED EFFICIENTLY
E-mail Form
ATTACHMENT 14A
Candidate/Firefighter
Evaluator/Instructor
ĂƚĞ
Evolution Performed:
Equipment needed:
Performance Objective
Evolution/Skill Steps
dŝŵĞ
ƌŝƚŝĐĂů&ĂŝůƵƌĞƐ
WĂƐƐ &Ăŝů ŽŵƉůĞƚĞ
Candidate/Firefighter
Evaluator/Instructor
ĂƚĞ
Evolution Performed:
Equipment needed:
Performance Objective
Evolution/Skill Steps
dŝŵĞ
ƌŝƚŝĐĂů &ĂŝůƵƌĞƐ
WĂƐƐ &Ăŝů ŽŵƉůĞƚĞ
Holmatro Extrication Equipment
T61, Power Unit, Cutters, Spreaders, Rams
Assemble Equipment and Perform Extrication
See Below
10 Mins
• Fails to peek and peal, prior to operating a tool.
• Fails to maintain the 10/10/20 rule or places head, hand or other body part past the window threshold.
• Fails to create a purchase point prior to attempting to spread the door. • Operates the tool while positioned between the tool and the vehicle. • Fails to manage panel movement or has to be stopped for personnel or equipment safety. • Fails to secure the door and have assistance in supporting the door prior to completely removing from vehicle.
• Inappropriately utilizes tools during the operation. i.e. uses the cutter tips to create a larger gap. • Any unsafe condition in which the proctor must step in and stop the evolution.
Any step with an *** signifies a critical failure
1.Build tool cache will all extrication equipment and Rescue 42’s.
2.Assemble Holmatro Tools and prepare to perform extrication.
3.Peal and Peek Prior to cutting or spreading.***
4.Perform Vehicle Extrication Techniques to remove door.
ATTACHMENT 14A
5.Creates purchase point when needed.***
6.Demonstrates safe practices when spreading or cutting. (avoids being in between vehicle and tools).***
7.Demonstrates safe practices by using 10,10, 20 airbag space whenever in vehicle.***
8.Utilizes assistant to secure and remove door prior.
9. ATTACHMENT 14A
Additional Notes:
Critical Failures/Notes:
New Changes:
Feedback :
Additional Notes:
Critical Failures/Notes:
New Changes:
Feedback :
E-mail Form
ATTACHMENT 14A
Training Record
Topic – Engine Company and Officer Training
Shift – A1
January
Personnel
Engine Officer
Boster x x
Yamamoto x x
Hong x
Odell x
Godinez x
Diaz Missed
Carvutto Missed Mandatory
Archambault x
Training Record
Topic – Engine Company and Office r ing
Shift – A1
January
Perso
Eng Officer
Boster x
Yamamoto x
Hong
Odell x
Godi e x
Diaz Missed
Carvutto Missed Mandatory
Archambault x
fficer Trainin
ry
sonnel
ngine
x
x
x
ll x
dinez
ATTACHMENT 14A
CITY OF REDONDO BEACH
Budget Response Report #15
June 7, 2022
Question:
What would it cost to repave Avenue I between Catalina Avenue and Elena Avenue? Response:
The 2020 Pavement Management System Report (2020 Report) included a survey and evaluation of the pavement along the stretch of Avenue I between Catalina Avenue and S. Elena Avenue and provided a Pavement Condition Index (PCI) for the street segment of 52. This portion of Avenue I is approximately 55,590 square feet, which is equivalent to 6,177 square yards. PCI scores in this range are typically not good candidates for slurry seal treatment and require more intensive rehabilitation methods.
The recommended treatment for blocks with a PCI of 52 is typically a mill and thick overlay. The estimated unit cost for this treatment in the 2020 Report is set at $50 per square yard.
Avenue I – Catalina Avenue to S. Elena Avenue Construction Costs Total square yardage of asphalt: 6,177/SY
Unit cost for grind and thin overlay: $ 50/SY
Cost for Rehabilitating Pavement: $ 308,850
The above cost is only for paving rehabilitation and should not be used for budgeting without accounting for the additional work done by the City when these projects go to construction. There are additional costs to prepare design documents, repair concrete curb, gutter and ADA curb ramps as required, add back striping, replace traffic signal loops that are damaged in the milling process, and provide construction management and inspection services. For budgeting purposes, this number should be escalated by 25- 30% to account for the other elements involved in completing the work. As such, the total cost to repave Ave I between Catalina and Elena Avenues is estimated to be $400,000. %55
3DJHRI
CITY OF REDONDO BEACH
Budget Response Report #16
June 7, 2022
Question:
What is the cost to enhance the crosswalks at S. Catalina Avenue and S. Elena Avenue? Response:
The intersection of S. Catalina Avenue and S. Elena Avenue is a three-legged intersection with all-way stop controlls and upgraded solar powered flashing LED stop signs.
Recently, as part of the crosswalk enhancements at the intersection, a curb bulbout was added to the west side of S. Catalina Ave to focus pedestrian crossing at this location and to add visibility to pedestrians emerging from the sidewalk. In addition, high visibility continental-style crosswalks were added to the north and east legs.
As the crosswalks are already enhanced with flashing all-way stop controls, a bulbout, and high visibility crosswalk markings there are limited options for further enhancement due to regulations in the California Manual on Uniform Traffic Control Devices (CAMUTCD) outlined in Section 4N.02 In-Roadway Warning Lights at Crosswalks. The Section states, “If used, In-Roadway Warning Lights at crosswalks shall be installed only at crosswalks with applicable warning signs. They shall not be used at crosswalks controlled by YIELD signs, STOP signs, or traffic signals.” One remaining option is the installation of raised pavement reflective markers in the crosswalk that would increase visibility for oncoming motorists, especially at night. The cost to add raised pavement markers is approximately $500 for this intersection.
BRR #16
BRR #17
CITY OF REDONDO BEACH
Budget Response Report #17
June 7, 2022
Question:
What is the cost to enhance the crosswalks at Grant Avenue and Aviation Blvd.?
Response:
The intersection of Grant Avenue and Aviation Blvd is an offset four-legged intersection (Grant Ave is opposite Ormond Lane) that is controlled by a traffic signal, with pedestrian heads at each corner. As such, there are limited options for enhancing the crosswalks with more electronic devices (e.g. beacons or rapid flashers) due to regulations in the California Manual on Uniform Traffic Control Devices (CA-MUTCD), as outlined in Section 4N.02 In-Roadway Warning Lights at Crosswalks. The Section states, “If used, InRoadway Warning Lights at crosswalks shall be installed only at crosswalks with applicable warning signs. They shall not be used at crosswalks controlled by YIELD signs, STOP signs, or traffic signals.”
The remaining enhancement options at this intersection include upgrading the current standard crosswalks to high visibility continental style crosswalks and installing a Turning Vehicles Yield to Pedestrians (R10-15) sign to remind drivers who are making turns to yield to pedestrians. The cost to complete these enhancements is approximately $3,500.
BRR #18
CITY OF REDONDO BEACH
Budget Response Report #18
June 7, 2022
Question:
What do other cities charge merchants for use of outdoor dining parklets in the public right of way? How much parking meter revenue is lost per parking space and what expenses are involved in constructing a dining deck?
Response:
Staff contacted neighboring/comparable cities that have installed dining decks in public rights of way and found a wide variation of assigned fees and charges.
Neighboring Cities (alphabetical)
El Segundo – does not currently charge rent for dining decks or for the segment of Richmond Street that has been closed to traffic and used for outdoor dining.
Gardena – No rental fees on record.
Hawthorne – No rental fee on record. Application fees suspended through 06/30/2022.
Hermosa Beach - $1.50 per square foot of area utilized.
Lawndale – No rental fees on record.
Manhattan Beach - $3.00 per square foot. The fee is currently suspended to assist restaurants in recovering from pandemic impacts.
Other Comparable Cities (alphabetical)
Beverly Hills – Fees suspended through 12/31/2022, with fees varying from $2.50 to $5.00 per square foot for parklet dining under consideration by the OpenBH Conversion Code and Fee Structure Subcommittee.
Culver City - $1.08 per square foot, plus a ROW Restoration Assessment, a Sewer Assessment, and an Application Fee.
Pasadena – Fees Suspended through 06/30/2022. Rates vary from $0.51-$1.34 per square foot and include an additional per spot parking recovery fee.
BRR #18
San Clemente - $4.00 per square foot for public property, $1.00 per square foot for private property.
Santa Barbara – Fees suspended through 07/01/2022.
Parking Meter Revenue
The rate charged for parking meters in Riviera Village is $1.50 per hour. Meters are enforced from 6:00 am to 9:00 pm, making potential revenue per meter $22.50 per day and $8,212.50 per year.
However, several factors impact parking meter revenue, such as permit holders parking in metered spaces and spaces not being occupied. During the 2019 calendar year, when parking meter rates were the same, the City was not yet impacted by COVID-19 and there were no dining decks, the average revenue per meter in Riviera Village was $3,527 per year, which equates to $294 per month.
Dining decks vary in size and number of occupied metered parking spots. If we estimate that the average dining deck occupies three metered parking spaces, the City has accepted the loss of approximately $882 in metered parking revenue per month for each dining deck. The average full parking space is 180 square feet, and three spaces total 540 square feet. As a comparison, if the City collects $2 per square foot, per month for each dining deck, and the dining decks on average occupy three full parking spaces, the City would receive $1,080 in monthly revenue.
Cost to Construct
The estimated cost to construct a permanent dining deck with K-rail traffic protection is approximately $110 per square foot, including design, materials and installation. A deck of typical size (18’ x 30’) costs roughly $59,400.
These estimates are based on previous installation costs and have been adjusted for the increased cost of construction over the past two years.
BRR #19
CITY OF REDONDO BEACH
Budget Response Report #19
June 7, 2022
Question:
What funding options are available to support the repaving of Grant Avenue?
Response:
Grant Avenue spans 1.25 miles from Inglewood Avenue on the east and Aviation Blvd. on the west. During the pavement study conducted by NCE in 2020 the estimated cost of repaving Grant Avenue was $2,617,000. Given increased construction and material costs, and the additive costs for necessary sidewalk concrete repairs, design services and other soft costs, it is reasonable to assume that the estimated cost has increased by 25%, pushing the estimated cost to repave Grant Ave. to approximately $3,300,000.
Grant Avenue is not a bus route and therefore is not eligible for Prop C funding, a source that is typically used for the City’s busier arterial streets. Potential funding sources include SB 1 State Gas Tax, Local Return Measure R, Local Return Measure M, and/or future General Fund Capital allocations.
It should be noted however, that there are specific ongoing/recurring street projects, including the City’s annual Residential Rehabilitation Project, that traditionally occupy a significant portion of the local return funds and SB 1 State Gas Tax funds. Furthermore, there are specific street projects, such as Artesia Blvd. from Harper Ave. to Hawthorne Blvd., Aviation Blvd. from Artesia Blvd to Manhattan Beach Blvd, and Rindge Ln. that are programmed to be funded by local return funds over the next three fiscal years. These projects, if approved in future CIP budgets as currently scheduled in the five-year program, will utilize the majority of available local return funds over the next several years.
Repaving Grant Ave. could be added to the unfunded CIP list and/or programmed for local return funds and capital funds in out years of the CIP plan. The council could also make Grant Ave. a priority in the deferred maintenance street CIP and fund it through that project account as funds become available.
BRR #20
CITY OF REDONDO BEACH
Budget Response Report #20
June 7, 2022
Question:
What is the cost to remodel the restrooms on the International Boardwalk near Quality Seafood?
Response:
In March 2020, the Public Works Department installed six new entrance doors and repainted the restrooms located near Quality Seafood. There are additional upgrades that could also be implemented. The estimated costs for these improvements are as follows:
Replace floor tile $30,000
Replace plumbing fixtures $60,000
A full reconstruction of the restroom can-not be accomplished at this location because the current restroom foot print and existing structural walls do not allow for the expansion of stall space needed to comply with ADA standards.
As an alternative, there may be an opportunity to place brand new ADA-compliant restrooms in a portion of the space formerly occupied by the Fun Factory. For planning purposes, new infill restrooms in this setting are estimated to cost approximately $500 BRR #20
per square foot. Assuming four restrooms, averaging 80 square feet each, the estimated construction cost is calculated to be $160,000. An additional 50% should be added to include design costs, contingencies, and construction management services required to effectively complete the project. Using these assumptions, the resulting budget estimate is approximately $240,000 for the installation of four new restrooms in the vacant former Fun Factory space.
BRR #21
CITY OF REDONDO BEACH
Budget Response Report #21
June 7, 2022
Question:
What is the cost to install raised crosswalks at four locations identified on Beryl Street and Diamond Street not currently included in the Capital Improvement Program? Response:
Raised crosswalks can have the benefit of increasing visibility of pedestrians crossing a street and slowing traffic to accommodate the vertical displacement created by the raised portion of the roadway. Unlike midblock raised crosswalks that the City Council has considered in the past, raised crosswalks at intersections typically bring an entire intersection, not just the crosswalk, from street level to sidewalk level. The roadway rises somewhat abruptly at each leg of the intersection, inducing drivers to slow down to cross.
Like raised midblock crosswalks, raised intersections also serve to reduce speeds and improve visibility of pedestrians. This forced slowing encourages motorists to yield to pedestrian crossers. Raised intersections also have the added benefit of being easier to navigate for emergency vehicles than crossing two raised crosswalks, one each at the entry point and departure point of the intersection.
The general cost to install a single raised intersection varies depending on the size of the intersection, the material used, and potential modifications to the existing infrastructure.
The cost to install raised crosswalks along Beryl Street, at North Lucia Avenue and at North Maria Avenue, and along Diamond Street, at North Juanita Avenue and North Helberta Avenue, including design and construction, is estimated to be roughly $547,000, (or $137,000 per intersection). These intersections would require reconstruction of existing curb ramps, additional curb drains, adjustments to existing infrastructure, and the relocation of at least one storm drain side-opening catch basin.
The following is a summary of the benefits and disadvantages of raised intersections:
Benefits – Raised intersections create a safer, slow-speed crossing and public space at minor intersections. Similar to speed cushions and other vertical speed control elements, they reinforce slow speeds and encourage motorists to yield to pedestrians at the crosswalk.
Disadvantages – General disadvantages associated with the construction of raised intersections include cost of design and construction, especially if large modifications to existing infrastructure, such as reconstruction of existing curb ramps, storm drains, and catch basins, are required. Additionally, the construction of curb raised intersections can involve the removal of on-street parking spaces to accommodate the design (approximately 1 to 2 spaces per corner depending on the location and design).
BRR #22
CITY OF REDONDO BEACH
Budget Response Report #22
June 7, 2022
Question:
What is required to improve maintenance of the upper pond at Wilderness Park and to reconstruct the lower pond?
Response:
Maintenance of the Upper Pond
A program for regular and improved maintenance of the upper pond should include the following:
- Skimming the pond surface daily to remove twigs, trash and small debris - Feeding the fish daily
- Back washing pond filters weekly
- Comprehensive cleaning once per year in the spring, which involves removing the fish to clean the sand and remove algae and other debris It is estimated these tasks would require roughly 1,400 hours of staff time per year, which represents roughly 3/4ths of the annual work hours of a full-time Maintenance Worker 1.
The cost for a part-time maintenance worker dedicated to this function would be approximately $40,000 per year. Additionally, it is estimated that it would cost roughly $2,000 annually for needed materials including fish food, algicides and skimming nets.
For comparison, when staff previously contracted out maintenance of the upper pond it cost $1,000 per month and provided for only one servicing per week.
Reconstruction of the Lower Pond
In 2019, staff prepared a BRR discussing the cost to renovate the lower pond. In it, the cost to install a shallow depth lined pond with water filtration was estimated at $475,000.
An expressed caveat was whether ADA accessibility would be required to this pond. This is an important issue that would require determination by an ADA compliance expert and an issue that could potentially subject the City to legal challenge.
The cost to install such an accessible path of travel could easily double the cost of the pond redevelopment. Escalation of pricing from 2019 to now, and the hyper volatility of the market in these last few months also lend themselves to uncertainty about the existing cost estimates. An initial budget estimate, inclusive of an ADA accessible path of travel to the lower pond could reasonably be estimated at $1,000,000 and could vary by 20% to 30%. Maintenance costs for the pond’s water system are likely to run between $2,000 BRR #22
to $2,500 per month initially, depending on the type of filtration system used (chlorine, biofiltration, etc.).
A new concern emerging this year is also whether development of this feature will be consistent with water restrictions likely to be imposed as the current drought worsens. In the past, water features were shut down due to water restrictions. The City’s efforts to reduce water use elsewhere could be negated by the addition of a new water feature that will, over time, consume potable water.
BRR #23
CITY OF REDONDO BEACH
Budget Response Report #23
June 7, 2022
Question:
What is the status of sworn police officer staffing in the Redondo Beach Police Department?
Response:
The current staffing status for the Redondo Beach Police Department’s 95 budgeted sworn personnel, as of June 1, 2022, is shown on the following table.
Position Authorized Frozen Filled Vacant
Chief of Police 1 0 1 0
Police Captain 3 0 3 0
Police Lieutenant 6 0 6 0
Police Sergeant 14 0 14 0
Police Officer 71 0 65 6
Total 95 0 89 6
The Redondo Beach PD currently has eighty-nine filled positions which includes two trainees who are currently part of the field training program, one police officer recruit currently in the academy, and one police officer recruit beginning the academy in July.
Three additional candidates were given conditional offers pending the results of their medical and psychological examinations and would bring the sworn personnel number to ninety-two (92). In addition, three Officers are out on IOD status, three Officers are on extended leave due to personal injury with no estimated return date, and two Officers are out on extended family leave.
Recruitment has been a consistent challenge for the Law Enforcement profession nationwide and Redondo Beach PD is not exempt from these challenges. The Department is committed to developing new and innovative ways to recruit qualified candidates via social media, academy visits, billboards, mobile sign boards, and professional flyers. Additionally, the Department is hoping to further incentivize hiring through the approval of Decision Package # 52 - PD Referral and Recruitment Program.
This program would increase recruitment for lateral candidates through sign-on and referral bonuses. Additionally, the Department intends to continue to market the City’s many video vignettes, special programs, special assignment details, positive history of community engagement, and its contemporary social media platforms to attract candidates from across the country.
BRR #24
CITY OF REDONDO BEACH
Budget Response Report #24
June 7, 2022
Question:
What are the estimated costs for the March 7, 2023 General Municipal Election? Response:
On March 7, 2023, the City Clerk’s Office will conduct the General Municipal Election for Councilmembers in District’s Three and Five, the City Clerk, the City Treasurer and two members of the Redondo Beach Unified School District Board. Also included on the ballot, as of June 7, is the cannabis initiative (a 20-page ordinance, as written). It is also possible that additional measures will be included on the ballot as a result of recommendations from the Charter Review Advisory Committee. Additional measures could increase printing and postage costs depending on the volume and type.
Overall, the estimated cost for the election is $353,725. Funding for the election is proposed as part of Decision Package # 21 and is comprised of the following:
x Staff: both part-time and overtime (pre-, day of, and post-election) to assist with the vote-by-mail process and signature verification in an amount of $45,000; x Postage: mailing of Voter Information Guide and prepaid vote-by-mail ballots in an amount of $35,500;
x Election costs related to poll workers and location procurement in an amount of $1,500;
x Supplies and Advertising costs for election associated supplies, certificate framing, annual election conference registration and travel, and legal advertising in an amount of $5,925;
x Contracts/Professional Services:
o Netfile – e-filing and City website publication of campaign finance reporting in an amount of $4,800;
o Consultants – professional services for pre-, day of, and post-election consultation and voter management election software in an amount of $50,000;
o Printing – fulfillment, printing of voter information guide, district and city-wide ballots, and language translation in an amount of $150,000; o Ballot Tabulation Equipment – includes vendor assisted on-site services in an amount of $50,000;
o Candidate statement upfront costs in an amount of $10,000; and o LA County - Verification of signatures not found in the county’s subscription database in an amount of $1,000.
BRR #25
CITY OF REDONDO BEACH
Budget Response Report #25
June 7, 2022
Question:
What are the benefits and feasibility of a self-service program at the North Branch Library? Response:
As part of the January 2022 Strategic Plan process, the Redondo Beach Library Commission submitted a letter asking the City Council to consider implementing the open+access system for the North Branch Library. An analysis of the benefits and feasibility of a library self-service program was then added as an Objective of the Strategic Plan.
Developed by the company Bibliotheca, open+access is a system that allows patrons access to a library building, as well as the building’s collections, computers, and Wi-Fi, during hours when the building is unstaffed. The service hours at both the North Branch and the Main Library were reduced during FY 2020-21 due to fiscal impacts from COVID19. The North Branch is currently open thirty-two hours per week (down from forty) while the Main Library is currently open forty hours per week (down from fifty-six). Due to its smaller size, the North Branch is a more feasible location for open+access than the Main Library.
The implementation of open+access at the North Branch Library would offer multiple benefits. Primarily, it would allow for an expansion of service hours without incurring the full costs of staffing. As an example, the Hill Road Library in Ventura County implemented open+access in February of 2018 which allowed the branch to open two hours earlier during weekdays and Saturday and allowed for additional services on Sundays. This particular branch has over 1,000 program patrons and has provided these additional hours of service at an estimated 60% reduced cost compared to normal staffed operations.
Cities across the state have received the California State Library “Bringing the Library to You: Mobile Library Solutions” grant to implement open+access within their facilities.
Santa Monica and Torrance are both recipients of this particular grant. While Santa Monica launched its open+access program in July 2021, Torrance was able to use grant funds to prepare for self-service hours by installing security cameras and retrofitting facility doors for automatic lock/unlock capabilities.
The California State Library plans to offer “Bringing the Library to You” grants again in FY 2022-23. This grant could potentially cover up to $5,000 of set-up fees as well as the first two years of subscription fees.
BRR #25
Bibliotheca provided a quote to Redondo Beach Public Library for the installation and ongoing subscription fees to implement open+access at the North Branch Library. Onetime installation fees total $6,198, while ongoing subscription fees total $10,688 annually.
The automatic door facing the parking lot would require modification to allow for electronically controlled access. Modifications could include a piggyback off a current access control, a link into the door sensor, or a dry contact relay going into an electronic strike lock. If the door has to be replaced entirely it could cost up to $40,000. There is an adjacent manual door as well as a manual door on the opposite end of the lobby, facing Artesia Boulevard. Although these doors would remain locked to prevent entry, patrons could exit from them.
Bibliotheca is unable to provide security cameras for the North Branch due to the complexity of the building. Representatives from the City’s existing security camera vendor, VectorUSA, provided the City with estimated costs. First year costs for the nine recommended cameras, installation, and monitoring would total approximately $20,023 and ongoing annual maintenance costs would be approximately $304. This turnkey system would tie into the existing video management software managed by the City Police Department.
The total cost for year one of the project, assuming the maximum cost for door modifications required, is estimated at $76,909, with no grant funds factored in. Going forward, open+access would require ongoing costs of approximately $10,688 for subscription fees and $304 in security camera costs. This is compared to restoring eight staffed hours per week to the North Branch at a cost of $30,000 annually in part-time funds. Additional hours, past the proposed restoration of eight per week, would require an additional allocation of full-time personnel.
Installation Expenditures
Installation fee $6,198
Subscription fee $10,688
Door modification $40,000
Security cameras $20,023
Total $76,909
Attachments
Library Commission strategic planning letter
open+access quote
VectorUSA proposal
Ocean Park Branch photos
Ongoing Annual Expenditures
Subscription fee $10,688
Security cameras $304
Total $10,992
ATTACHMENT 25A
ATTACHMENT 25A
ATTACHMENT 25A
Redondo Beach Public Library
Extending Access and Advanced Analytics
Date: March 17th, 2022
ATTACHMENT 25B
www.bibliotheca.com, page 1
March 17, 2022
Susan Anderson
Director, Redondo Beach Public Library
303 N. Pacific Coast Highway
Redondo Beach, CA 90277
tel 310 318-0674
Re: Extending Access and Advanced Analytics
Dear Mrs. Anderson,
Libraries today are faced with many unique challenges. We have conversations with libraries that are struggling to respond to the need for patrons to gain access to library materials during the Covid-19 pandemic. During our conversation this week, we learned of your preliminary goal for reopening Redondo Beach Public Library and that creating a safe way increase access to materials is a top priority.
More than ever, shift workers, students, senior citizens and vulnerable individuals all need Redondo Beach Public Library’s resources. They need access to crucial library materials and services, and they need a self-service experience that allows them to safely socially distance and while accessing your resources. We don’t know how long the current pandemic will last, but forward-thinking libraries like yours are taking action now so they can continue to stay relevant and accessible well into the future.
With the right partner, Redondo Beach Public Library can re-open its libraries with extended access technology that increases access to your resources and keeps patrons safe during and after the Covid-19 crisis. bibliotheca will support you in taking the next steps toward enhancing library services at a time when the community needs it most.
This proposal includes special pricing to assist Redondo Beach Public Library in re-opening its libraries. As the Covid-19 pandemic has shown us, libraries remain critical for their communities, and providing accessible and safe ways to access library materials is of utmost importance.
Please contact me with any questions.
Sincerely,
Mason Humphrey
VP of Sales, West
ATTACHMENT 25B
www.bibliotheca.com, page 2
Flexible extended access
Redondo Beach Public Library needs a solution that will allow you to comply with social distancing guidelines and embrace the need for increasing patron engagement and awareness by offering extended access to your resources. By moving quickly to deploy technology in safely re-opening your libraries, Redondo Beach Public Library will be making it safer for patrons to access materials and library services in a way they find most comfortable.
In fact, 75% of patrons prefer self-service solutions, according to a recent study by Pew Research Center. Staff members will also benefit from increased patron self-service, as they can focus on the needs of community, rather than spending precious time on transactional processes.
How can you encourage patrons to return to Redondo Beach Public Library and reassure them that safe social distancing will be in place? How can you use technology to control the number of people physically allowed in the building at one time to comply with social distancing guidelines?
Without a measured approach to allowing access, Redondo Beach Public Library risks becoming a virus hotspot.
Our proposal includes two different Open+ solutions that will allow patrons to enter the library during staffed and un-staffed hours to use your solutions and services or accurately track occupancy in the building/spaces.
Libraries around the world have offered Open+, our flexible extended access solution, to their libraries for years. bibliotheca’s Open+ will support you in meeting Redondo Beach Public Library’s goals:
_ Supports social distancing compliancy
_ Extends access to library resources during a time when more and more patrons will need it
_ Increase library hours, especially on Sundays and for branches with fewer open hours We appreciate the opportunity to present our solutions and welcome any discussion about our proposal.
ATTACHMENT 25B
www.bibliotheca.com, page 3
open+ controlled library access
With almost 1000 libraries relying on open+ globally, bibliotheca is the first library technology provider in North America to bring a truly integrated library-focused solution that allows for extended access to library spaces and resources.
open+ complements staffed library hours, creating a more convenient and accessible community hub. From extending access to an entire library or only a section of it, providing full self-service resources or mainly a holds pick-up area, open+ allows libraries the flexibility to extend access in the way that best meets the needs of their community and space. There is no one-size-fits-all approach with this technology.
An annual open+ subscription is predictable as there is no increase to price if you increase open hours. In addition, the open+ subscription includes ongoing software releases and support for the entire solution, and it’s a hosted solution, so CPL doesn’t have to worry about on-site server maintenance.
Learn how open+ works: https://www.youtube.com/watch?v=PoIV-h7bCR0 ATTACHMENT 25B
www.bibliotheca.com, page 4
Helping libraries comply with new social distancing regulations By using state-of-the-art technology, bibliotheca’s Open+ solutions has been deployed at hundreds of libraries around to world to:
Control the physical access to the building: Using the Open+ Core access control panel, library staff can remotely and automatically lock the doors when the building has reached its maximum level of compliancy. This ensures continued support of social distancing within the library. It also eliminates the need for staff to personally attempt to restrict people from entering the library. Once a user leaves the library, freeing up capacity, the doors automatically unlock for new library users to enter. This delicate balance of ingress and egress is controlled by a central software system with flexible occupancy limits. open+ can be linked to our digital communication platform and other displays to inform users of current occupancy restrictions to entry.
Broadcast messages to all members: Open+ Core includes an integrated audio system that plays pre-recorded announcements triggered by customizable scenarios. Library staff can use these messages to let people know when the library is close to capacity and kindly ask those who have been in the library for an extended time to finish their visit and free up space for new visitors.
Gain real-time accurate people counts with Open+ Count: Using a flexible, 3D camera-based people-counting solution on select library entrances, Open+ Analytics quickly, accurately, and anonymously determines how many people are inside the building at one time. Paired with the occupancy software, live screens placed throughout the library display real-time occupancy counts. Color-coded warning levels provide a visual indicator of library capacity and warn users and staff when occupancy nears a non-compliance.
ATTACHMENT 25B
www.bibliotheca.com, page 5
open+ Pricing
We have special pricing to assist Redondo Beach Public Library in re-opening your libraries with extended access solutions that can be tailored to each branch. The following pricing is the basic open+ Access & Count implementation with supporting hardware and software.
Products include implementation and 12-month warranty Quantity Price per Unit
open+ Access subscription & hardware service
Annual per branch. This price is for 1 branch, however, if you implement Open+ Access at more than one location the pricing for the subscription goes down
1$9,989
open+ Access enterprise hardware for initial installation One-time, per branch.
Hardware includes:
_ 1 Controller
_ 1 Entry panel
_ 1 Amplifier
_ 2 Speakers
_ CAT7 cable/connectors
1 $4,499
open+ Count enterprise annual software & hardware subscription $699 Annual per year, hosted. $1,100 one-time fee for remote setup, configuration, and web portal access.
1$1,799
Introduction to open+ Count Training
One-time remote training session (2 hours) for up to 10 staff to deep dive into the Open+ Count analytics solution, best practices, and how to present live information to the public 1$350
Shipping & Handling 1$249
Note: The library is required to prepare the sites for all open+ implementations according to bibliotheca’s site-planning guides. Open+ Count hardware is self-install and the software and configuration is remotely installed by Bibliotheca.
ATTACHMENT 25B
www.bibliotheca.com, page 6
Accepted By: ____________________________________________________________ Accepted Date: __________________________________________________________ Customer Purchase Order Number: _________________________________________ ATTACHMENT 25B
Bibliotheca, LLC
3169 Holcomb Bridge Road, Suite 200
Norcross, GA 30071
www.bibliotheca.com
[email protected]
ATTACHMENT 25B
Vector Resources, Inc dba VectorUSA
20917 Higgins Court, Torrance CA 90501 Confidential
VRN 110909-001
May 24, 2022
Prepared For: City of Redondo Beach Library
Susan Anderson
303 N. Pacific Coast Highway
Redondo Beach, CA 90277
Project Description: New Turnkey Surveillance System
Proposal V.1
Prepared By: Salvador Palacios
Account Executive
310-436-1090
[email protected]
ATTACHMENT 25C
2 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Table of Contents
Company Overview ................................................................................................................................. 3 Executive Summary ................................................................................................................................. 4 Statement of Work................................................................................................................................... 5 Overview ........................................................................................................................................ 5 Cameras and Mounts......................................................................................................................... 5 Servers, Storage and Licensing ........................................................................................................... 5 Switching ........................................................................................................................................ 5 Power ............................................................................................................................................. 5 Connectivity .................................................................................................................................... 5 Pathway .......................................................................................................................................... 6 Deliverables ........................................................................................................................................ 6 Assumptions ....................................................................................................................................... 6 Exclusions .......................................................................................................................................... 6 Definitions .......................................................................................................................................... 7 Project Parameters / Caveats ..................................................................................................................... 8 Price Guarantee ..................................................................................................................................... 10 Lead Time Disclaimer ............................................................................................................................ 10 Project Pricing ...................................................................................................................................... 11 Warranty .............................................................................................................................................. 12 Maintenance and Managed Services ......................................................................................................... 13 Terms & Conditions............................................................................................................................... 14 Signature & Acceptance ......................................................................................................................... 17 Appendices........................................................................................................................................... 18 IPVM Drawing .................................................................................................................................. 18
ATTACHMENT 25C
3 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Company Overview
VectorUSA’s corporate vision is to become the unsurpassed standard in “connecting people to information and the world.” We build our business one customer at a time through our family of dedicated employees providing reliable, high quality communications designs and solutions that exceed our customers’ expectations.
Headquartered in Torrance, CA, with offices in San Diego, CA, Rancho Cucamonga, CA, Scottsdale, AZ and Charlotte, NC, VectorUSA maintains an industry-wide reputation for delivering the highest quality products and services while executing projects on time and on budget in all types of production environments.
VectorUSA employs more than 350 people trained and certified to support the products and services we offer.
Through continuous training and education, we maintain numerous certifications in the areas of Data Center Design and implementation, Collaboration / Video Conferencing, Unified Communications / VoIP, Cloud, Network Infrastructure, Wireless Networking, Cyber Security, Physical Layer - Fiber and Copper Infrastructure, Surveillance & Analytics, Access Control as well as Commercial and Professional Audio-Visual Systems.
Customer service and support is paramount; to provide the best service possible, VectorUSA has two network operation centers one in California and another in North Carolina. This allows us to provide 24/7/365 coverage to our clients.
VectorUSA has established partnerships with the industry leading manufacturers included in our products and service portfolio. Our partnerships include Cisco Gold, Cisco Data Center Architecture, Cisco Collaboration Architecture, HP Enterprise / Aruba Platinum, Microsoft, VMWare, Veeam, Fortinet, Qognify, Milestone Gold, Avigilon, Axis, Hanwa Gold, Siemon Company, CommScope, Corning, Sumitomo, Hitachi, Crestron, Extron as well as other industry leading manufacturers.
ATTACHMENT 25C
4 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Executive Summary
VectorUSA has assessed the library and is recommending the following surveillance solution. Our proposed surveillance design includes 10 Hanwha cameras, 10 new Qognify Ocularis Enterprise licenses and SMA’s for the library. The libraries new surveillance system will tie into the existing video management software managed by the city police department. New cable support hardware will be provided in the area above the hard lid ceiling.
ATTACHMENT 25C
5 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Statement of Work
Overview
VectorUSA will provide a new surveillance system that will tie into the existing video management software for the City of Redondo Beach Police Department.
Cameras and Mounts
VectorUSA will provide and install a total of ten (10) new cameras. The camera models and types to be installed indoors are as follows:
x (1) Hanwha PNM-9000VD – 2x5MP Dual-Sensor w/ IR – (1) Surface Mount x (2) Hanwha QND-6082R – 2MP Indoor Dome w/ IR – (2) Surface Mount x (5) Hanwha QND-8080R – 5MP Indoor Dome w/ IR – (5) Surface Mount x (1) Hanwha QNF-9010 – 12MP Fisheye Dome w/ IR – (1) Surface Mount x (1) Hanwha QND-6012R – 2MP Indoor Dome fixed 2.8mm lens w/ IR – (1) Surface Mount Camera locations are shown on the IPVM drawings in the Appendix. Camera views will be configured by VectorUSA with the direction of the end user main point of contact.
Servers, Storage and Licensing
VectorUSA will provide ten (10) new Qognify Ocularis Enterprise camera licenses and SMA for the cameras added to the North Library. It is assumed the cameras will link back to the police department VMS system so they can have the view of the cameras. It is assumed the centralized storage will have room for the new cameras. The following shows the calculation for the retention needed for the new cameras:
If more storage is needed on the back end to accommodate these cameras, the adjustment to the project will be addressed via a written change order or through a separate proposal. VectorUSA will configure the camera views and the VMS software on the back end to set the required recording retention and settings for the library cameras.
The yearly Ocularis SMA license cost for the ten (10) cameras in this proposal is $304.30 (Pending price fluctuations year to year).
Switching
VectorUSA assumes the existing switches have enough PoE ports and can be used for the ten new cameras.
Power
It is assumed PoE power will be used to power the new cameras.
Connectivity
VectorUSA will provide and install new Category 6 plenum copper cable to connect to the new cameras. Cables will have a permanent link between the patch panel in the IT Closet and a surface mount box near the camera location.
Patch cords will be installed on each side with one connecting to the camera from the surface mount box and one connecting to the existing switch from the patch panel.
ATTACHMENT 25C
6 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Pathway
New cable support hardware will be provided in the area above the hard lid ceiling. VectorUSA assumes there is an access hatch to get above the ceiling to run the cable for the cameras. If there is no access, a new solution for pathway will need to be addressed via a written change order.
Deliverables
Upon completion of work outlined in the Statement of Work, VectorUSA will provide the client with a closeout package containing the following documentation:
Surveillance Closeout Documentation Checklist
Included Description Notes
܆ As-Built Drawings
ց Asset List
܆ Final Camera FOV Images
տ Inspection Report
܈ IPVM Drawings Included in Appendix
Assumptions
x VectorUSA assumes existing switches can be used for this project. x VectorUSA assumes the centralized server for the police department will be used to record and view these new cameras at the North Library.
x VectorUSA assumes there is access above the ceiling in the library to run the new cable.
If any of the above assumptions are incorrect, the adjustments to the project will be addressed via a written change order.
Exclusions
x VectorUSA excludes providing switching for this project. x VectorUSA excludes any electrical for this project.
x VectorUSA excludes providing patch panels for this project. x VectorUSA excludes providing a new workstation or components to view the cameras.
ATTACHMENT 25C
7 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Definitions
Surveillance Asset list: Asset lists provide information on devices pertinent to the project. This includes but is not limited to the following:
x Server Information
x VMS Information
x Camera Information
x IP Information
x Network Topology Information (if applicable)
Final Camera Field-of-View (FOV) Images: The final camera FOV is the coverage provided by a camera within the surveillance system after configuration and alignment. This is the view that the end-user will receive and approve prior to completion of a job.
IPVM - IP Video Market (surveillance industry information) Drawings: IPVM drawings provide an overview of proposed camera installations and can provide information on camera types, lens types, FOVs, frame rates, storage requirements, and other important surveillance information.
ATTACHMENT 25C
8 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Project Parameters / Caveats
Change Order: Any work that is added to or deleted from the original scope of this proposal that alters the original costs or completion date must be agreed upon by both parties in the form of a written change order.
Proprietary Information: The information contained in this document is proprietary to VectorUSA and intended to be used as evaluative and / or bidding information only. No part of this document may be disclosed, reproduced and/or distributed to anyone except the listed recipients within this package without written permission from VectorUSA.
Add & Delete: Any additional work requested outside of the scope of work will be considered as separate work and addressed in
the form of a written change order. This proposal is not to be used as an "add & delete" schedule.
Defective Materials: If, due to problems with the existing hardware and / or materials provided by the client or other third parties, here is a delay and / or VectorUSA is unable to perform the work outlined in the scope of work it will be addressed in the form of a written change order.
Extraordinary Service: Certain additional charges related to extraordinary levels of support or out-of-pocket costs incurred by VectorUSA, through no fault of its own, shall be reimbursed to VectorUSA by the client under this agreement.
Examples of costs reimbursable under this section include, but are not limited to 1) shipping expenses related to unusual site handling fees (e.g., extra distance, no loading dock, extra stairs, extra demurrage charges); 2) storage or special handling expenses incurred if an installation site is not able to accept delivery as scheduled; 3) expenses incurred by VectorUSA to resolve network compatibility issues caused by a client’s election to substitute nonVectorUSA provided equipment or services; and 4) expenses incurred by VectorUSA for additional installation time and / or materials caused by a site not being prepared as called for in this proposal. VectorUSA shall promptly notify the client in writing of such charges. Notification will be provided, when feasible, prior to the incurrence of such charges, unless circumstances preclude such prior written notification (by way of example, but not limited to, unusual site handling charges). Provided the incurrence of such charges is not due to VectorUSA’s fault or negligence, VectorUSA shall be entitled to an equitable adjustment in the prices herein, the delivery schedule, or both, to reflect such charges and any related delay.
Schedule: VectorUSA plans to implement this project in a continuous fashion or following the baselined schedule if submitted as part of this project. If delays or changes are introduced that are outside of VectorUSA’s control, and those changes result in additional cost those costs will be addressed in the form of a written change order.
Delays: The client must provide five (5) working days advance notice of any delays that will impact this project. If proper notice is not provided VectorUSA reserves the right to issue a work stoppage change order. Additionally, idle time incurred due to the absence of required escorts, clearance, permits, inability to enter the workplace, delays by other trades or other factors beyond VectorUSA’s control will be addressed in the form of a written change order.
Workdays / Overtime: All work will be performed during VectorUSA's standard business hours of 7am - 5pm, Monday – Friday, or as specified in the statement / scope of work. If changes to the stated work hours are required due to conditions outside of VectorUSA’s control result in additional cost those costs will be addressed in the form of a written change order.
ATTACHMENT 25C
9 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Asbestos / Hazardous Environments: VectorUSA assumes that its installation teams will be working in areas that do not contain asbestos or any other hazardous material that would require additional time or alternative installation procedures. It is the responsibility of the client to provide written notification to VectorUSA of any asbestos contained material (ACMs) in or around the area of the project prior to the start of a project. If ACMs are present prior to job commencement or if ACMs are encountered during the project, additional cost, damages and / or delays attributed to necessary procedures for working in this environment will be the client’s responsibility.
Ceiling Tile: VectorUSA exercises care in the removal, storage, and reinstallation of existing (used) ceiling tiles:
however, Vector accepts no liability for any incidental damages that may result from the handling of ceiling tiles.
Office Furniture: VectorUSA is not responsible for disassembling or moving desks or other office furniture to gain proper access to perform work.
Storage Area: The client shall provide a secured storage area onsite for VectorUSA's materials and tools. If adequate space is not provided, or the cost of temporary storage is not included in our proposal that cost will be addressed in the form of a written change order.
Coring: If any coring, x-ray, or sonar inspections are necessary that are not specifically included in our proposal, it will be addressed in the form of a written change order.
Existing Conduit: The client is responsible for ensuring that existing conduit / pathway that may be used for this project is installed and utilized in accordance with NEC requirements, have adequate space available for addition of new cables, will not exceed 60% fill ratio after new cables have been added, and are free of obstructions, blockages, and / or defects. If existing conduits / pathways to be used for this project need to be brought into compliance with current code and standards, VectorUSA can assist the client with this work if the client requests such assistance and those costs can be addressed in the form of a written change order.
ATTACHMENT 25C
10 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Price Guarantee
Due to the volatility in markets affecting material costs across all product lines we can only guarantee material costs for 30 days unless otherwise specified. If a purchase order is not received within the guaranteed window any increases will be addressed through a new proposal.
Lead Time Disclaimer
At the time of this proposal lead time for the materials specified was up to 60 Days.
Lead times on material orders are verified at the time we submit our proposals based on our understanding of the anticipated project period of performance. With the current volatility in the market driven by supply and demand those lead times cannot be guaranteed past the date of the proposal. Lead times will be refreshed once a purchase order is received and if any items have lead times that impact the project timeline a Stakeholder notification will be sent. If needed alternative “equivalent” products may be discussed and if agreed upon substituted to maintain the desired period of performance.
ATTACHMENT 25C
11 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Project Pricing
ATTACHMENT 25C
12 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Warranty
VectorUSA provides, for all work completed under this contract our Vector USA warranty. This warranty coverers all workmanship for a period of one year unless specifically extended in writing as part of this agreement.
While this agreement extends the manufacturer’s warranty for all items installed that warranty does not include labor required to replace, return, remove, install, or configure those items. If a product or item requires replacement under the manufacturer’s warranty VectorUSA will provide the labor to replace that item on a time & material basis. Materials covered under that warranty will be provided under the warranty, if any additional supporting materials are required that are not covered, they would be billed.
Please note that RMA’s typically require the product to be returned in the original packaging. It is recommended that packaging be retained if possible.
This warranty does not include any damages or cost related to unforeseen environmental evens including but not limited to fire, water, rodents, construction, abuse, or misuse. VectorUSA can address and repair issues of this nature through a service request at an additional cost. If VectorUSA responds to a warranty request and upon arriving on site or at any time during that warranty call determines that the issue is related to an uncovered event or condition work will stop and the client shall be notified. If the client authorizes the repairs the warranty call will be converted to a service call and billed accordingly
ATTACHMENT 25C
13 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Maintenance and Managed Services
Maintenance Services
VectorUSA offers a full complement of proactive maintenance services to ensure the systems and software within this proposal are kept in a healthy and available state throughout the systems lifecycle. VectorUSA maintenance services can be created on a customized basis to ensure the right level of care matches the client’s business objectives and budgeting. Maintenance services are fulfilled by VectorUSA’s Service Center, backed by a full complement of Systems Technicians, Application Specialists and Network Engineers.
Maintenance Services are typically packaged into offerings based on expected lifecycle maintenance tasks or in a looser Time and Materials basis. All maintenance services provided by VectorUSA include priority queueing and 24x7 phone and email support lines, with maintenance tasks receiving proactive, flexible and predictable scheduling.
VectorUSA maintenance services can be bundled with Qognify and Hanwha Software & Hardware support to provide a complete systems maintenance solution for organizations.
Managed Services
VectorUSA provides enterprise-level IT managed services over a nationwide footprint via our (2) U.S. based Network Operations Centers (NOC)s and best-in-class services partnerships.
VectorUSA employs a ITIL-based services portfolio grouped into (3) tiers of packages based on business criticality for each individual system. VectorUSA managed services alleviates the stress on organizations to maintain a fully staffed 24x7 IT support structure, even when the pace of their business operates in a non-stop environment.
By empowering their organizations with VectorUSA managed services, our clients are able to make data-driven decisions to synchronize technology with their business objectives. Our full complement of core infrastructure managed services is able to support a heterogenous and hybrid IT footprint across geographies.
In addition to its core infrastructure services, VectorUSA manages client programs providing organizations with a single point of contact for its user helpdesk, endpoint & desktop services and cybersecurity operational services partnerships.
ATTACHMENT 25C
14 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Terms & Conditions
Assumptions and Exclusions: The above stated assumptions and exclusions are fully integrated and incorporated within the below terms and conditions and are to be treated as one inclusive document.
Scope of Services: VectorUSA agrees to provide the services stated in this Agreement for all Customer Premise Equipment (“Equipment”). VectorUSA does not warrant that the operation of any listed Equipment shall be uninterrupted. The services to be supplied by VectorUSA for the total charge set forth on this Agreement shall consist of personnel services required to respond appropriately to Customer incidents and issues, and requests for additional professional services and materials as required.
Charges for materials and services outside the scope of this Agreement but still required to resolve Customer requests shall be due and payable upon receipt of an invoice after the completion of the installation, repair, or other service. The charges and all other charges payable to VectorUSA under this Agreement are exclusive of federal, state or local tax, other than a tax on net income now or hereafter in effect or become applicable to any payment due under this Agreement, or to the Customer’s equipment. The Customer shall file all necessary tax returns and shall pay all such taxes.
Access: Customer agrees to maintain, where required, a full time, dedicated Internet connection and to allow VectorUSA access to the Customer’s network via that Internet connection. Customer agrees to allow VectorUSA employees or subcontractors access to its facilities in order to perform services under this Agreement. Customer agrees to allow VectorUSA access to the covered Equipment. Customer agrees to allow VectorUSA to load any necessary management software on their systems and / or install a Vector-owned device on the Customer network as required. Customer agrees to furnish VectorUSA with Administrator-level password access for all covered Equipment and servers, where necessary. VectorUSA agrees not to prevent Customer from accessing any Equipment owned by the Customer. If persons other than VectorUSA representatives shall perform maintenance, or repair the Equipment, and as a result further repair by VectorUSA is required to restore the Equipment to good operating condition, such repair will be made at rates for additional onsite service established in this Agreement.
Limited Warranty: VectorUSA warrants to the Customer that the material, analysis, data, programs and SERVICES to be delivered or rendered hereunder will be of the kind and quality designated and will be performed by qualified personnel. VECTOR USA MAKES NO OTHER WARRANTIES, WHETHER WRITTEN, ORAL, OR IMPLIED, INCLUDING
WITHOUT LIMITATION THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE.
Excusable Delays: VectorUSA shall not be liable for any failure or delay in furnishing maintenance or spare parts hereunder resulting from fire, explosion, flood, storm, Act of God, governmental acts, orders or regulations, hostilities, civil disturbances, strikes, labor difficulties, difficulty in obtaining parts, supplies, or shipping facilities, inability to obtain or delays in obtaining suitable material or facilities required for performance, temporary unavailability of qualified personnel, failure by Customer to provide full and appropriate access to the covered Equipment, failure of monitoring hardware or software, Customer Internet connection failure, or other causes beyond VectorUSA’s reasonable control.
Exclusions: THIS AGREEMENT DOES NOT INCLUDE THE REPAIR OR REPLACEMENT OF ANY HARDWARE PRODUCT,
OR ANY SOFTWARE LICENSING EXCEPT SOFTWARE INSTALLED AND USED EXCLUSIVELY BY VECTOR USA TO PROVIDE MONITORING AND REPORTING SERVICES. Charges for the above will be on a Time and Materials basis. The Customer is advised to maintain hardware warranties on covered equipment at their own discretion and expense.
Customer is responsible to assure all software used by the Customer is appropriately licensed.
ATTACHMENT 25C
15 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Limitation of Liability: The Customer agrees that VectorUSA will not be liable for any special, incidental, indirect, or consequential damages hereunder, including but not limited to the loss of profit, or liability to third parties, however caused, whether by the act or negligence of VectorUSA or otherwise. It is recognized that the Equipment contains memories or other devices which have accumulated substantial data. In no event shall VectorUSA be liable to the Customer if any such data is lost or rendered inaccurate, regardless of the cause of any such loss or inaccuracy.
VectorUSA’s liability on any claim of loss or liability, arising out of or connected with this Agreement (including, but not limited to, loss or liability arising from VectorUSA’s breach of contract of any alleged act or negligence of Vector) shall in no case exceed the total purchase price of services covered under this Agreement. In no event shall VectorUSA’s liability for any services under this Agreement exceed $25,000. VectorUSA will in no way be held responsible and / or liable for damages, monetary or otherwise, by customer, or any other affected party, in the event of a security breach or network security-related outages, damages, losses, etc.
In no event shall either VectorUSA or the Customer be liable to the other for any indirect, special, punitive, exemplary, incidental or consequential damages (including, but not limited to, lost profits, lost business opportunities, or loss of use or equipment down time, and loss of or corruption to data) arising out of or relating to any portion of this Agreement, regardless of the legal theory under which such damages are sought, and even if VectorUSA has been advised on the possibility of such damages or loss.
Software and Operating System Errors: This Agreement is limited to services specifically defined in this Agreement.
It is the responsibility of the Customer to ensure that all of its files are adequately backed up and that all necessary materials are available, including manufacturer recovery media for software and other software to be reloaded. In no way is VectorUSA liable for defects or “bugs” in software, or for correcting errors introduced into the data, programs, or any other software due to hardware failure, or for any cost of reconstructing software or lost data.
Any technical support required to restore data integrity or to make the system function, such as, but not limited to, rebuilding corrupted records, examining files, re-installation of O / S or Software, or re-indexing databases, will be billed separately on a Time and Materials basis.
Indemnification: The Parties agree to hold each other, their employees, officers, directors, affiliates, and agents harmless from and to defend and indemnify each other from and against any and all claims, actions, disputes, fines, penalties, liquidated damages, reasonable legal costs, or other loss or liability arising from the negligent acts or omissions of the Party, its employees, officers, directors, affiliates and agents under this Agreement.
Scope of Agreement: If the scope of any of the provisions of the Agreement is too broad in any respect whatsoever to permit enforcement to its full extent, then such provisions shall be enforced to the maximum extent permitted by law, and both the Customer and VectorUSA hereto consent and agree that such scope may be judicially modified accordingly and that the whole of such provisions of this Agreement shall not hereby fail, but that the scope of such provisions shall be curtailed only to the extent necessary to conform to the law.
Assignment: This Agreement may not be assigned by either the Customer or VectorUSA without the prior written consent of the other party. Except for the prohibition on assignment contained in the preceding sentence, this Agreement shall be binding upon and inure to the benefit of the heirs, successors and assigns of the parties hereto.
Integration Clause: This instrument contains the entire agreement between the parties hereto and supersedes any and all prior written and / or oral agreements. This Agreement may be altered or modified only in writing signed by the parties hereto.
Applicable Law: This Agreement shall be governed by the laws of the State of California. It constitutes the entire Agreement between the Customer and VectorUSA. Its terms and conditions shall prevail should there be any variance with the terms and conditions of any order submitted by the Customer for the repair or maintenance of the Equipment in the Equipment. Either party may terminate this Agreement at any time for failure of the other to comply with any of its Terms and Conditions.
ATTACHMENT 25C
16 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Confidentiality, Publication and Non-Compete: VectorUSA and the Customer agree that any and all information identified by the other as "Confidential" and / or "Proprietary", or which, under all of the circumstances, ought reasonably to be treated as Confidential and / or Proprietary, will not be disclosed to any third person without the express written consent of the other party. Confidential Information includes, but is not limited to, information about the respective entities' products and services, information relating to purchasing, accounting, pricing, marketing and customers not generally known in the business in which the entity has been, is or may become engaged and which is developed by, disclosed to, or becomes known as a consequence of or through each party's relationship with the other. Confidential Information does not include any information or development: (i) which is or subsequently becomes available to the general public other than through a breach by the receiving party; (ii) which is already known to the receiving party before disclosure by the disclosing party; (iii) which is developed through the independent efforts of the receiving party; or (iv) which the receiving party rightfully receives from third parties without restriction as to use.
Upon the expiration of the term of this Agreement, VectorUSA shall, and shall instruct its agents to whom Confidential Information was disclosed pursuant hereto, continue to treat as confidential and preserve the confidentiality of all Confidential Information received from the Customer.
Neither VectorUSA nor Customer shall directly or indirectly, solicit, recruit or hire any Customer or VectorUSA personnel, whether or not such personnel performed work for the Customer, during the term of this agreement and for a period of one (1) year after the termination of this agreement. The provisions of this Section shall survive the termination or expiration of the Agreement.
The Customer represents that he is owner of the Equipment subject to this Agreement or if not the owner, he has authority to enter into the Agreement.
Prevailing Wage: Unless specifically stated in the scope of work VectorUSA has based this proposal on nonprevailing wage labor rates. If we are informed or it is determined later that the project is subject to prevailing wage rates for the performance of the public work portion of the contract, VectorUSA will submit those changes / additional costs that the project may incur will be address in the form of a written change order.
Sales Tax: If Sales tax is applicable, it shall be is calculated and billed based on the effective tax rates at the date of invoice.
Payment and Termination: All payments are due net 30 from the date of invoice. VectorUSA reserves the right to stop work, delay delivery of services and / or products for failure by customer to pay within terms of this agreement.
VectorUSA reserves the right to deem this contract in default immediately and terminate it if the payment is delinquent more than thirty (30) days. If customer is in default in the payment of the Agreement charge(s) and fails to cure such default within ten (10) days after receiving written notification of such default, the Customer agrees to pay reasonable collection costs, late charges and / or Attorney Fees. Late charges, if levied, shall be assessed at
1.5% monthly or 18% annually.
Contract: Unless otherwise agreed upon in writing this contract will be executed as a fixed price contract.
Acceptance of Order: This quote is valid for 30 days. The prices, specifications and conditions are satisfactory and are hereby accepted. VectorUSA is authorized to do the work as specified. Signature and Purchase Order due upon acceptance.
ATTACHMENT 25C
17 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Signature & Acceptance
Material Total $ 8,772.74
Labor Total $ 10,606.67
Tax Total $ 643.95
Proposal Total $ 20,023.36
Accepted and Approved for:
City of Redondo Beach Library VectorUSA
303 N. Pacific Coast Highway 20917 Higgins Court
Redondo Beach, CA 90277 Torrance, CA 90501
(Date) (Date)
(Printed Name) (Printed Name)
(Printed Title) (Printed Title)
(Signature) (Signature)
ATTACHMENT 25C
18 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Appendices
IPVM Drawing
IPVM Designer Calculation | May 23, 2022
Overview
ATTACHMENT 25C
19 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Camera 1: Imager 1
Camera 1: Imager 2
ATTACHMENT 25C
20 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Camera 2
Camera 3
ATTACHMENT 25C
21 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Camera 4
Camera 5
ATTACHMENT 25C
22 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Camera 6
Camera 7
ATTACHMENT 25C
23 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Camera 8
Camera 9
ATTACHMENT 25C
24 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential Camera 10
Network Closet 1 (Devices 1–10 of 10)
ATTACHMENT 25C
25 | Page
VectorUSA / 20917 Higgins Court / Torrance, CA 90501 Confidential This presentation is an output of the IPVM Designer / Calculator but is the work product of the individual who created it. IPVM does not guarantee nor warranty the work therein nor its implementation. Issues that may impact actual performance include but are not limited to lighting conditions, lens quality, and compression level.
ATTACHMENT 25C
Santa Monica Public Library- Ocean Park Branch
open+access Photos
card access to door automatic sliding doors
notice on door
ATTACHMENT 25D
posted rules security camera
phone access to staffed location
ATTACHMENT 25D