BLUE FOLDER ITEM
Blue folder items are additional back up material to administrative reports and/or public comments received after the printing and distribution of the agenda packet for receive and file.

CITY COUNCIL MEETING
June 14, 2022
L.1.

CONTINUED PUBLIC HEARING TO CONSIDER THE FISCAL YEAR 2022-23

PROPOSED BUDGET, FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM, AND

ASSOCIATED BUDGET RESPONSE REPORTS
a. Reconvene the Public Hearing, take testimony;
b. Continue the Public Hearing to June 21, 2022; and
c. Receive and file Budget Response Reports.

CONTACT: JENNIFER PAUL, FINANCE DIRECTOR
• Memo to City Manager from Public Works Director
• North Pier Parking Structure 2021 - Condition Assessment Report • South Pier and Plaza Parking Structure 2021 – Condition Assessment Report
• Letter from South Bay Parkland Conservancy
• Communication from Public Safety Commissioners
• Nine (9) FY2022-23 Budget Response Reports

MEMORANDUM
Date: June 13, 2022
To: Mike Witzansky, City Manager
From: Ted Semaan, Public Works Director
Re: 2021/22 Pier Parking Structures Condition Assessment As part of the City’s ongoing efforts to invest in its infrastructure, the City Council authorized structural assessments of the three waterfront parking structures (North Pier, South Pier, and Plaza Parking Structures) in late 2021 and early 2022. Walker Parking Consultants/Engineers (Walker) was hired to continue work that began in 2012 and has produced two assessment reports, one for the combined waterproofing and structural maintenance assessment of the South Pier Parking Structure and Pier Plaza Parking Structure and the second for the North Pier Parking Structure. The North Pier Parking Structure report was prepared separately because it includes a separate seismic evaluation of the structure in addition to the waterproofing and structural maintenance assessment.

Each report begins with a cover letter / executive summary which identifies various type of deficiencies to be addressed and a recommendation for a budget to address them over a five-year period. The budget for the five-year period is summarized as follows:

South Pier PS / Plaza Parking PS waterproofing & repairs $15,150,000 North Pier PS waterproofing & repairs $ 1,536,500
North Pier PS seismic improvements (lump sum) $ 1,820,000 $18,506,600
Each report also contains an amortization schedule, reflecting how those costs might be spread over a period of five years for funding consideration. Costs for the first year are summarized as follows:

South Pier PS / Plaza Parking PS waterproofing & repairs $ 2,095,000 North Pier PS waterproofing & repairs $ 558,000
North Pier PS seismic improvements (lump sum) $ 1,820,000 $ 4,473,000
The existing CIP has approximately $110,000 of carryover funding for Pier Parking Structure Improvements. The proposed FY 2022-23 Budget includes a recommendation of an additional $4,350,000 for the project to fund the first year of recommended waterproofing and repairs, and the seismic retrofit.

Attachments
• Attachment 1 – North Pier Parking Structure 2021 - Condition Assessment Report • Attachment 2 – South Pier and Plaza Parking Structure 2021 - Condition Assessment Report

CITY OF REDONDO BEACH

NORTH PIER PARKING

STRUCTURE
2021-CONDITION ASSESSMENT

CITY OF REDONDO BEACH
Redondo Beach, CA
Prepared for:

Mr. Stephen Proud
Director of Redondo Beach
415 Diamond Street
Redondo Beach, CA 90277
707 Wilshire Blvd, Suite 3650
Los Angeles, CA 90017
213.488.4911
walkerconsultants.com

PARKING CONDITION ASSESSMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA
WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 1
EXECUTIVE SUMMARY 2
IMMEDIATE REPAIRS - RISK MANAGEMENT ................................................2 SUMMARY OF TYPES OF DEFICIENCIES ........................................................2 INTRODUCTION 4
BACKGROUND INFORMATION .....................................................................4 OBJECTIVES ..................................................................................................5 PARKING STRUCTURE DESCRIPTION ............................................................6 RECOMMENDATIONS 10
IMMEDIATE REPAIRS - RISK MANAGEMENT ..............................................10 RECOMMENDED BASE REPAIRS: YEARS 1-5...............................................11 STRUCTURAL ITEMS ...................................................................................11 WATERPROOFING WORK ITEM..................................................................11 MECHANICAL, ELECTRICAL, AND DRAINAGE WORK ITEMS .......................11 MISCELLANEOUS ITEMS .............................................................................11 FUTURE PREVENTATIVE MAINTENANCE 14
BENEFITS OF TIMELY REMEDIATION..........................................................14 OPINION OF PROBABLE COSTS 15
IMPLEMENTATION 16
DISCUSSION 16
IMMEDIATE REPAIRS - RISK MANAGEMENT ..............................................16 STRUCTURAL WORK ITEMS........................................................................17 WATERPROOFING SYSTEMS.......................................................................17 CONCRETE TESTING AND ANALYSIS 18
SEISMIC EVALUATION 18
OBSERVATIONS 19
LIMITATIONS 19
PHOTOGRAPHS ..........................................................................................26 A .................................................................................................................26 MATERIAL TESTING ....................................................................................27 B .................................................................................................................27 UTC REPORT ...............................................................................................28 C .................................................................................................................28 SEISMIC EVALUATIONS ..............................................................................29 D.................................................................................................................29

TABLE OF CONTENTS

PARKING CONDITION ASSESSMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA
WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 2

EXECUTIVE SUMMARY
The City of Redondo Beach retained Walker Consultants to carry out a Condition Assessment Update of the three existing parking structures - North Pier, South Pier, and Plaza parking structures, and develop a capital improvement program for the facility. This report only includes the North Pier parking structure. The condition assessment report of South Pier and Plaza parking structures was already issued in December 2021 as a separate report. This report includes an updated condition assessment and an updated seismic evaluation of the North Pier parking structure as requested by the City of Redondo Beach. The condition assessment is intended to provide our professional opinion on the current condition of the structural system and other components, such as waterproofing and drainage, that can affect the service life of the structure. In addition, the assessment identifies any needed maintenance and repairs to the structural system and waterproofing components and provides our recommendations for implementing the work. We evaluated the overall general condition of the structures with visual observations and compared our new findings to the 2012 and 2015 Walker findings.

This report also includes the Tier 1 and 2 seismic evaluations of the North Pier Parking Structure. Tier 1 consisted of completion of appropriate standard checklists of evaluation statements to identify potential deficiencies in a structure based on performance of similar structures in past earthquakes. The outcome of this phase is a list identifying the seismic non-compliant deficiencies that could represent risks to the structure. Tier 1 screening evaluations was used as the basis for Tier 2 seismic evaluation. Tier 2 involved engineering analysis to investigate whether deficiencies identified in Tier 1 require mitigation. The outcome of this phase is a retrofit scheme to mitigate structural seismic deficiencies as described in this report. Our investigation found that the seismic performance of the structure has been fair. The 1992 retrofit efforts improved the lateral load carrying capacity and load transfer paths. There are some deficiencies in the retrofit that allow for discontinuous load transfer. The recommended Base Repairs in the appendix D address improving the seismic performance.

On February 14, 2022, Walker sent a draft of this condition assessment report to the City of Redondo Beach. A 5- year repair program formulated in the draft and in this final report was developed considering the City’s available annual budget, maximizing benefits from previous work and repair priority, and maintaining parking structure accessibility and occupancy. Also, the 5-year repair program focuses on immediate repairs as well as the necessary repairs to extend the useful service life of the structure. Based on the City of Redondo Beach’s request, as an alternative for City to consider, Walker has also developed an opinion of the probable costs of a Ten-Year repair program for the North Pier parking structure in this final report.

This 2021 report incorporates the 2012 and 2015 Walker reports as a reference. Our 2021 findings indicated that, overall, the parking structures have continued to deteriorate compared to the findings reported in the 2012 and 2015 Walker reports. In general, the 2012 and 2015 Walker recommendations remain unchanged except for areas of structures that have been addressed in the 2017 and 2019 repair programs.

IMMEDIATE REPAIRS - RISK MANAGEMENT
Risk Management repairs are those required to address safety issues and to mitigate potential unsafe conditions from a risk management perspective.
 Remove all loose and delaminated concrete from the slab and beam underside where delaminated concrete appears on the surface. Repairs to these areas can be deferred and addressed during the implementation of the base repair program shown below.
 Remove and replace corroded barrier system on the Pier Level of the parking structure.

SUMMARY OF TYPES OF DEFICIENCIES
Durability and Maintenance
 Soffit slab deterioration and spalls with exposed and corroded reinforcement.

PARKING CONDITION ASSESSMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA
WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 3
 Concrete overlay deterioration and delamination.
 Concrete beam deterioration with exposed and corroded reinforcement.  Concrete column spalling.
 Concrete wall deterioration and delamination.
 Waterproofing system deficiencies.

Seismic
 Thickening of CIP shear walls on Basement and Pier Levels.  Addition of carbon fiber wrap at precast double tee stems on Village and Pier Level.  Addition of slab reinforcement at Shear walls.
 Increase concrete cover at CIP columns at Grid line Y.  Increased thickness of slab at Shear walls (East-West direction)  Install new drilled piers.
 Install new concrete shear walls at Pier and Basement Level.

We recommend that the City of Redondo Beach perform the base repair program outlined in this report that will correct the observed seismic deficiencies, and durability deterioration and enhance the waterproofing systems to protect the structural slabs and reduce the potential for water infiltration throughout the structures.

We recommend that the City of Redondo Beach budget approximately $1,536,500 to maintain the North Pier parking structure over the next five years and budget separately a lump sum $1,820,000.00 for recommended seismic structural repairs. The budget costs presented are based on historical data. As a result of the COVID-19 epidemic, prices and schedules have changed. Therefore, these costs should be considered a rough order of magnitude and used for basic planning purposes. The actual costs may not be realized until the project is designed and bid by a contractor. Budgeting for capital improvements and work items will help the City of Redondo Beach plan for necessary funding for the recommended work over the next 5 years. This will help maximize the service life of various components of the structures and maintain the structures in good service condition with minimum downtime.

Please see the attached discussion and appendices for a detailed report of our investigation.

Sincerely,

WALKER CONSULTANTS
June 06, 2022
Behnam Arya, PhD, PE Date
Senior Consultant
June 06, 2022
Khan Sohban Date
Senior Engineer, PE
June 06, 2022
Hassan Suhail Date
Project Engineer I

PARKING CONDITION ASSESSMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA
WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 4

INTRODUCTION

BACKGROUND INFORMATION
Walker Consultants performed a condition assessment for the North Pier parking structures located in Redondo Beach, California. The Walker Consultants staff conducted the onsite investigation of the parking garage on November 10, 2021. The evaluation and report will provide our professional opinion of the overall condition of the parking structures and update the prior 2012, and 2015 Walker’s conditional appraisal reports with recommendations for current repair and preventative maintenance needs to maintain the service life for the structure. The City of Redondo Beach has requested Walker to perform a new condition assessment of the parking structure since the last condition assessment of the parking structure was completed more than six years ago. The condition assessment update consisted of a visual survey and documentation of observations. In addition to condition assessment, Walker also updated the Tier 1 and 2 seismic evaluations of the structure that we performed for the structure in 2012. Walker completed a Tier 1 and Tier 2 building screening procedure in 2012 based on the American Society of Civil Engineers (ASCE) standard ASCE 31-03 “Seismic Evaluation of Exiting Buildings” published in 2004 which was the nationally recognized standard at the time our investigation. The updated Tier 1 and Tier 2 analyses was performed per the ASCE 41-17, which is the current state-of-the-art and generally accepted standard for seismic evaluation of building structures. The seismic checklist and procedures in ASCE 41-17 have been updated compared to ASCE 31-03. Furthermore, the seismic hazard levels in ASCE 41-17 have changed based on earthquakes that have occurred around the globe since 2004 (when ASCE 31-03 was published).

Walker Consultants conducted material testing on several concrete components of the North Pier Parking Structure in 2012 to check the as-built condition and to use their properties for seismic evaluation. However, testing was only performed at the Pier level. The Basement level in 2012 was occupied by the Redondo Beach Fun Factory, which provided a play area for children and families, and was not accessible for testing. The Fun Factory closed in 2017 and the Basement level is now vacant. This has provided an opportunity to conduct additional testing on the structure to obtain information on the original walls of the building at the Basement level. With the approval of the City of Redondo Beach, Walker conducted additional testing on the North Pier Parking Structure.

Testing primarily consisted of coring of concrete walls to obtain compressive testing as well exploratory opening of concrete walls to check size and placement of steel reinforcement. The results of new concrete testing were used in our seismic evaluation analysis.

Nomenclature
In the summer of 2011, Walker performed a condition assessment of the parking structures. In June 2012, Walker performed a structural analysis of the North Pier parking structure and prepared an Asset Management Plan (AMP), formerly known as Capital Improvement and Protection Program (CIPP), detailing opinions of probable repair costs over ten years for all three structures. The report was submitted to the City in August 2012 and is referred to herein as the 2012 Walker Report. Also, in October 2015 Walker performed a condition assessment update and prepared opinions of probable costs for two timeline scenarios for the parking structures. The report was submitted to the City in January 2016 and is referred to herein as the 2015 Walker Report. Please refer to the reports mentioned above for additional information.

Previous repairs
As requested by the City of Redondo Beach, the 2015 condition assessments proposed three different scenarios of repair with approximate costs for each option. These options were: A limited three (3) year repair and maintenance program; a 10 – 15-year repair and maintenance program; and an option of full replacement of the Pier Parking Structures. Based on our 2015 condition assessment and the cost associated with the proposed

PARKING CONDITION ASSESSMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA
WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 5
options, the City of Redondo Beach selected the 10 - 15-year repair and maintenance program option. Walker has been awarded several contracts for the development of plans, specifications, and estimates (P, S & E’s) to bid the work out to restoration contractors for the Pier Parking Structures. The first round of repairs was performed in 2017 on the South Pier parking structure and the second round of repairs was completed in 2019 on both the South Pier and North Pier structures. It was also conveyed to Walker during our site visits that some repairs were performed on the Plaza Parking Structure as a change order to the previous repair program.

Since 2017, Walker has provided parking structures restoration and maintenance design services for City of Redondo including the following:
 In 2017, the first repair project occurred mainly on the South Pier parking structure, consisting of the removal and replacement of traffic coating, isolated concrete floor repairs, concrete ceiling repairs, partial concrete beam repairs mainly on spandrels projecting out on the west end of the garage, concrete column and wall repairs, replacement of expansion joints, crack and joint treatments, installation of cathodic protection at repairs, and a few miscellaneous repairs.  In 2019, the second repair project occurred, consisting of the installation of new traffic coating, isolated concrete floor repairs, concrete ceiling repairs, partial and full depth concrete beam repairs, concrete column and wall repairs, replacement of expansion joints, crack and joint treatments, installation of cathodic protection at repairs, replacement of top-level barrier cables and railing, and some miscellaneous repairs. Most of the repairs primarily focused on the Village level of the North Pier parking structures, and some minor repairs were also carried on the Village level of South Pier parking structure.

OBJECTIVES
The objective of this investigation is to provide updates on the overall condition assessment and the seismic evaluation and provide an opinion of probable cost for the necessary repairs, based on the observed conditions as well as our experience with similar parking structure conditions and repair costs. For this investigation and to meet the objective, we performed the following services:

1. Reviewed previous Condition Appraisal Reports prepared by Walker Consultants, dated August 2012 and October 2015 respectively.

2. Reviewed Owner Review Construction documents and project specifications prepared by Walker Consultants, dated January 2017.

3. Reviewed Construction documents and project specifications prepared by Walker Consultants, dated March 2019.

4. Reviewed existing framing plans of the parking structure to aid in our observations.

5. Conducted a field evaluation of the parking structure to document the current exposed conditions of the structural and waterproofing elements. This consisted of visual observation as well as limited nondestructive testing to review the following elements: floors, columns, beams, walls, ceilings, façade, and other structural elements.

6. Identified potential structural related conditions that require immediate attention.

7. Compiled and reviewed all field data to determine possible causes and effects of the documented deterioration.

8. Performed the Tier 1 screening and Tier 2 analysis for seismic evaluation of the North Pier parking structure.

9. Outlined the repair program requirements for a 5-Year AMP.

10. Provided an opinion of probable cost for implementing the repairs.

11. Phased the work according to priority over a multi-year program to assist with fiscal planning.

PARKING CONDITION ASSESSMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA
WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 6

12. Prepared the current report with a summary of observations, including photographs depicting the areas noted in the report, findings.

The objective of the 5-year Budget Forecast is to provide the City of Redondo Beach with an asset management tool for planning and budgeting of capital expenses over the next 5 years. The 5-year plan recommends restoration capital improvements and work items for this parking facility so that the Owner can maximize the service life of the structure with the least amount of capital cost.

PARKING STRUCTURE DESCRIPTION
The North Pier Parking Structure was constructed in early 1960’s and has experienced nearly 70 years of service life. The parking structure is constructed of precast concrete double tees supported on precast columns, beams, and girders. One of the unique aspects of the pre-cast double tee construction is that the tees are spaced apart to allow for closure pour strips along every tee flange. Based on the drawings received, the exposed upper level is referred to as the Village Level, the mid-level is referred to as the Pier Level, and the lowest level is referred to as the Basement Level. The footprint of the structure is 273 feet (north - south) by 123 feet (east - west) Figure 1 shows an aerial view of the parking structures, and Figures 2 to 4 display the floor plans of the North Pier parking structures. Figures 5 to 8 show overall views of the exterior elevations of the parking structures. Figures 9, and 10 show the recommended locations for traffic coatings. Figure 11 show location of immediate repairs.

Figure 1 – Aerial view of the parking structures (Google Earth Pro)

PARKING STRUCTURE - SOUTH
Project North
Actual North
PARKING STRUCTURE – NORTH
PARKING STRUCTURE – PLAZA

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 7
Figure 2- Basement Level- Slab on Grade, North Pier Parking Structure Figure 3- Pier Level Plan, North Pier Parking Structure Project North
Actual North
Project North
Actual North

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 8
Figure 4-Village Level Plan, North Pier Parking Structure Project North
Actual North

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 9
Figure 5- Overview of Village Level, (North Pier Parking Structure) (BA1-219) Figure 6- Partial North elevation, (North Pier Parking Structure) (SH2-273)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 10
Figure 7- Partial West elevation, (North Pier Parking Structure) (BA1-229) Figure 8– Partial East elevation, (North Pier Parking Structure) (BA1-282)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 11

RECOMMENDATIONS
Based on our visual observations, we found the North Pier parking structure to be in fair condition. The concrete floors, ceilings, walls, and columns had some level of deterioration that needs to be addressed. Our assessment did identify specific locations where localized deterioration is visible in the structure. The recent repair project has addressed the significant concrete deterioration and restored components of the waterproofing and structural systems on the Village Level of the parking structure
To improve the parking structure's current condition, we have developed a 5-year repair program for the facility.

The 5-year program has an associated Asset Management Plan (AMP). The AMP contains repairs to address the currently deteriorated elements and preventive maintenance to address needs anticipated over the next 5-year period. We recommend that the City of Redondo Beach approximate the budget to implement the program over the next 5 years.

IMMEDIATE REPAIRS - RISK MANAGEMENT
Immediate concerns are defined as items that may reduce pedestrian safety and structural integrity if not completed.
 Remove all loose and delaminated concrete from the slab soffit and beam underside where delaminated concrete appears on the surface. Repairs to these areas can be deferred and addressed during the implementation of the base repair program shown below. This work should be performed by either City personnel or private contractors working under the direction of the City of Redondo Beach.  Remove and replace corroded barrier system posts on the Pier Level. Particularly on the north and west end of the parking structure.

As always, it is appropriate that Operation staff conduct weekly inspections to check that facility for potential hazard such as open spalls or cavities in the concrete floor, loose concrete, etc. and have them remedied immediately to reduce potential risk of incident.

RECOMMENDED BASE REPAIRS: YEARS 1-5
Based on our findings, we recommend implementation of a structured restoration plan, including repairs to structural elements, repairs of deterioration of the slab, repairs to the parking structure waterproofing systems The recommended restoration program concentrates on repairs to the deteriorated sections of the structure and future protection of its structural components. We recommend implementing the following repairs and maintenance in the next 5 years:

STRUCTURAL ITEMS
 Perform the recommended seismic strengthening recommendations identified in the Seismic evaluation report (Appendix E).
 Repair of all deteriorated concrete slab soffit on the Village and Pier Levels.  Repair isolated concrete overlay spalls/deterioration on the Pier Level.  Perform column, beam, and wall repairs in isolated locations on the Pier and Basement Levels.  Repair of concrete curb at perimeter of parking in isolated locations on the Pier Level.  Repair cracks in concrete walls, beams, and columns in isolated locations on the Pier and Basement Levels.  Concrete repairs of the west and east ends of the cantilevered concrete joists.  Installation of passive galvanic systems in all concrete repairs.

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 12

WATERPROOFING WORK ITEM
 Remove existing epoxy-based traffic coating and replace with new urethane traffic membrane on all exposed concrete surfaces on the Pier Level.
 Recoat the existing traffic topping on the Village Level.  Rout and seal floor cracks on the Pier Level.

MECHANICAL, ELECTRICAL, AND DRAINAGE WORK ITEMS
 Isolated areas of ponding were observed and should be resolved by either cleaning out the existing drain (if present) or installing a supplementary drain.

MISCELLANEOUS ITEMS
 Clean and paint misc. steel members.
 Repaint traffic markings.
 Paint slab soffit, walls, and columns

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 13
Figure 9– Proposed new traffic membrane, North Parking Pier Structure – Pier level Remove existing traffic coating
with new Urethane traffic
coating.

KEY:

Project North
Actual North

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 14
Figure 10– Recoat traffic membrane, North Parking Pier Structure – Village Level Figure 11– Immediate Repair location, North Parking Pier Structure – Pier Level Project North
Actual North
Recoat existing traffic coating on
Village Level.

KEY:

KEY:

Project North
Actual North`
Remove and replace the existing
barrier system with new barrier
system.

Note: City personnel should walk through the Pier level every week to knock down any visible loose concrete spalls on the ceiling above.

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 15

FUTURE PREVENTATIVE MAINTENANCE
Maintenance performed on a regular basis will take full advantage of the structural repairs and waterproofing work. Without maintenance, the facility will not see the expected service life from the structure or the repairs and waterproofing. Typical maintenance includes routine sealing of joints, recoating of wall and floor membranes along with periodic concrete repairs.

Funds for maintenance of the garage should be accrued yearly considering the life expectancies of certain elements such as sealants, coatings, floor membranes, concrete repairs, etc. The life expectancies expressed vary depending on workmanship, quality of materials, use and exposure to elements. After all the work is completed, the supported level should be washed down at least twice a year.

BENEFITS OF TIMELY REMEDIATION
There are many benefits to providing the repair and preventive maintenance program at the earliest feasible time, in addition to the imminent needs of providing the “Immediate Repairs” listed previously.

Long-term delay of repairs significantly increases cost. The cost to repair and maintain this facility will continue to increase at progressively faster rates when deterioration continues as modeled in the following graph. The main benefits from implementing the recommended repairs and waterproofing are:
o Mitigate the infiltration of water and chlorides.
o Maintain the structural capacity and maintain the service life of the structure. o Cost savings due to avoidance of structural repairs that are more expensive and facility shutdown. o Higher levels of service to the users of the facility due to fewer days of downtime because of more extensive structural repairs.
o Provides for a greater degree of safety by inhibiting deterioration mechanisms before they have a chance to cause serious harm.
o Long term delay of repairs significantly increases future costs. o Less noise21 and disruption both within the garages and the buildings above. “Poor” Garages are between
points B and C
“Fair” and “Good” Garages
are between points A and B
Short-term repairs (3-5
years) only move curve
slightly (B to B1)
Repaired “Fair” and “Good”
Garages are between points
B
1 and C1
Long-term repairs (12 to 20
years) move curve
considerably (A to A1)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 16

OPINION OF PROBABLE COSTS
The table below provides our opinion of probable construction costs for the recommended repairs for a Five-Year restoration maintenance program. The costs were developed using pricing from our database obtained from similar type projects competitively bid in the Los Angeles area.

With the development of repair programs such as in this report, contingency funds must be anticipated and included in any budget for repairs to account for concealed, unknown, or unanticipated conditions. For this type of restoration work, we recommend that a 10% contingency be set aside for potential changes due to unknown conditions. This contingency cost is included in the project costs. The cost estimates are based on 1st Quarter 2022 dollars.

According to the American Concrete Institute Committee 362, “Repairing an existing deteriorated structure involves many unknowns, uncertainties and risks. Especially with regard to repair of chloride caused corrosion damage, the process is considered an extension of the useful life of the deteriorated structure. It is not equivalent to building a new structure with current technology.”
The cost to perform seismic rehabilitation is not included in Table 1 and should be budgeted separately as a lump sum of $1,820,000.00. Please refer to Table 4 and Appendix D for more information on this cost breakdown.

Table 2, and 3 at the end of this report includes a more detailed cost estimate.

Table 1 - Five-year Repair program–Opinion of Probable Costs

YEAR BUDGET
2022 $558,000
2023 $773,000
2024 -
2025 -
2026 $192,000
Total $1,536,500
NOTE: The budget costs presented are based on historic data. The effects of the COVID-19 pandemic have resulted in changing costs and schedules, therefore, these costs should be considered a rough order of magnitude and used for basic planning purposes. Until the project is designed and bid by a contractor the actual costs may not be realized.

NOTES:

1. Cost opinions are based on historical data and
experience with similar types of work and are based
on 2022 prices.

2. Actual costs may vary due to time of year, local
economy, or other factors.

3. Cost opinions do not include costs for phasing,
inflation, financing or other owner requirements, or
bidding conditions.

4. Costs have been increased 3% for inflation each year.

5. Cost opinions do not include upgrades if it becomes
necessary to bring the structure up to current
building code requirements, seismic upgrades, or for
ADA or similar items.

6. The structure has not been reviewed for the presence of, or subsequent mitigation of, hazardous materials
including, but not limited to, asbestos and PCB.

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 17
Recommended Ten – Year Repair Program (North Pier Parking Structure) Per City’s request, as an alternative for City to consider, Walker has also developed a Ten-Year repair program for the North Pier parking structure. The opinion costs for the recommended 10- year repair program for the North Pier parking structure is currently $ 2,259,000 in 2022 dollar. The recommended North Pier parking structure maintenance and repair budget for the next ten years is shown below in Table 1.1, followed by a detailed breakdown in Table 5.

Table 1.1 - Ten-year Repair program–Opinion of Probable Costs

YEAR BUDGET
2022 $558,000
2023 $464,500
2024 $400,500
2025 -
2026 $192,000
2027 -
2028 $137,500
2029 -
2030 $323,500
2031 $183,000
Total $2,259,000

IMPLEMENTATION
The outlined repair program can be competitively bid and executed by experienced restoration contractors. The first step in this process is to obtain a quality set of bidding documents prepared by experienced restoration engineers. These documents should be procured to ensure repairs are designed appropriately and quantities are sufficiently estimated to competitively bid the project by restoration contractors.

DISCUSSION

IMMEDIATE REPAIRS - RISK MANAGEMENT
We observed spalled and loose concrete on multiple locations on both – Village and the Pier Level slab soffit of the North Pier parking structure. The loose concrete can get detached and introduce a life safety hazard to pedestrians. Remove all loose and delaminated concrete from the slab and beam underside where delaminated concrete appears on the surface. Repairs to these areas can be deferred and addressed during the implementation of the base repair program shown below. Walker recommends all supported slabs, beams, columns, and walls to be reviewed on a regular basis by visual means and sounded by hammer tapping along spalls. Any overhead spalled areas found are a potential safety hazard. The City should continue to review areas of potentially loose and cracked concrete and remove them before they become an overhead hazard.

The barrier system on the Village Level has undergone a major renovation as part of the 2019 Repair program.

The barrier system on the Village level was in good condition after the renovation. However, the Pier Level perimeter barrier system was not a part of the 2019 Repair program. The existing barrier system has been exposed to ravages of weather and time passage. Peeling of paint and corrosion of steel posts has been observed in many

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 18
locations on the barrier system. Replacement of existing corroded steel posts located in the southwest end of the parking structure is recommended.

STRUCTURAL WORK ITEMS
Our primary focus of the condition assessment was to identify and update the 2012 and 2015 Walker findings and accordingly develop updated repair protocols that will keep the structures operational for 10 additional years.

Over the last few years, the City of Redondo Beach has invested significantly in the repair and maintenance of the three parking structures – North Pier Parking Structure, South Pier Parking Structure, and Plaza Parking structure.

This work has been performed per the Walkers 2012 and 2015 AMPs in order to extend the life of the structures.

Refer to Walker's 2012 and 2015 condition appraisal reports for more information on causes attributed to the observed deficiencies.

This updated AMP plan is designed to help the City of Redondo Beach plan for repairs, future maintenance, and improvements for the parking structures. The City of Redondo Beach has implemented a limited portion of work for North Pier Parking structure outlined in Walker’s original 2012 and 2015 AMPs, respectively. A reduced scope of work was completed in 2017 and 2019 repair programs to maintain the structure for 10 -15 years while discussions of possible new development that incorporated replacement parking were contemplated. This 5-year AMP forecast builds off the limited work and maintenance repairs completed during the past 10-years and provides the capital improvements required to maintain the structure for the next 10-year program.

The parking structure has remained in operation for almost seven decades and has been subjected to harsh environmental conditions over its service life. Physical structural conditions have led us to believe that the structure is overall in fair condition. The field assessment indicates the structure is undergoing structural deterioration in non-repaired areas, primarily to the underside of the village level concrete slab. Our review of this structure suggests deferred preventative maintenance, and the delay of a comprehensive restoration program has led to the current deterioration conditions. The Installation of traffic coating on the Village level during the 2019 Repair program was a significant step to mitigate the potential for reinforcing steel corrosion. The best way to counteract the remaining corrosion process involves applying an electrochemical treatment. This can be achieved by repairing the sections showing spalling or exposed rebars.

Precast concrete double tees stem, beams, and columns had numerous locations that had deteriorated resulting in cracked and spalled concrete. Moisture laden with chlorides that penetrate the concrete creates a situation where the embedded steel reinforcement begins to corrode. The corrosion of the steel reinforcement creates rust formation on the steel which induces stresses into the surrounding concrete. If the stresses to the concrete exceed the tensile strength capacity of the concrete, a crack will occur which will propagate into a delamination, and ultimately a concrete spall. Deterioration of structural elements of the parking structure shortens the effective service life of the structure and the deterioration of the parking structure will accelerate overtime if left unattended.

The Shear wall is cracked and deteriorated in select locations primarily along the south and east wall of the structure. The walls should also be monitored annually for additional cracking.

Overall, concrete curbs on the pier level are in fair condition with limited cracking and other deterioration related issues.

WATERPROOFING SYSTEMS
The traffic coating on the Pier Level has excessive wearing where the coating has worn into the base coat with some areas worn completely through the coating to the concrete substrate. Given the significant wear down and localized areas of debondment of the coating, we recommend that the coating be removed and replaced with a new traffic coating system. Removing the existing system, instead of recoating over the existing system, prevents

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 19
possible issues with bonding a new system to an existing that may have marginal bond in areas. Removal also allows replacement of the existing joint and crack sealants. These sealants are protected by the traffic topping but in areas where the traffic topping has failed the underlying sealant was observed to be cracked and brittle, which may have contributed to the coating failure along the joint and cracks.

The Village Level received a traffic bearing waterproof membrane as part of the 2019 Repair program. The waterproof membrane is in good condition for its age. Typically, these waterproofing systems have a service life of 7-10 years with proper maintenance. The life of the membrane can be extended by applying a re-coat of the top layer of the system. The re-coat procedure requires cleaning of the surface, preparation of worn or damaged areas with base and intermediate coatings and then an application of a full topcoat with aggregate. Therefore, installation of new traffic marking paint is required after installation of the new traffic topping coating. Our cost opinion includes recoating on the Village Level in Year 5; however, we recommend that the condition of the traffic coating be reviewed to determine if recoating is required at that time.

CONCRETE TESTING AND ANALYSIS
Walker Consultants conducted material testing on several concrete components of the North Pier Parking Structure in 2012 to check the as-built condition and to use their properties for seismic evaluation. However, testing was only performed at the Pier level. The Basement level in 2012 was occupied by the Redondo Beach Fun Factory, which provided a play area for children and families, and was not accessible for testing. The Fun Factory closed in 2017 and the Basement level is now vacant. This has provided an opportunity to conduct additional testing on the structure to obtain information on the original walls of the building at the Basement level. With the approval of the City of Redondo Beach, Walker conducted the following additional testing on the North Pier Parking Structure.

1. Coring of concrete walls to obtain compressive testing

2. Exploratory opening of concrete walls to check size and placement of steel reinforcement Slater Waterproofing Inc. was engaged to obtain concrete cores and to perform destructive opening on January 12 and 13, 2022 under the direction of Walker staff. Concrete cores were sent to Universal Construction Testing (UCT) for laboratory testing to obtain compressive strength. Details of concrete testing and the lab report prepared by UCT are attached in Appendix B and C, respectively. Ground Penetrating Radar (GPR) was also used on concrete surfaces at test locations prior to destructive opening to locate the embedded rebar and to prevent cutting rebar during the coring process.

SEISMIC EVALUATION
Walker Consultants performed the Tier 1 and 2 seismic evaluations of the North Pier Parking Structure. Walker had completed a Tier 1 and Tier 2 building screening procedure in 2012 based on the American Society of Civil Engineers (ASCE) standard ASCE 31-03 “Seismic Evaluation of Exiting Buildings” published in 2004 which was the nationally recognized standard at the time our investigation. The updated Tier 1 and Tier 2 analyses was performed per the ASCE 41-17, which is the current state-of-the-art and generally accepted standard for seismic evaluation of building structures. The seismic checklist and procedures in ASCE 41-17 have been updated compared to ASCE 31-03. Furthermore, the seismic hazard levels in ASCE 41-17 have changed based on earthquakes that have occurred around the globe since 2004 (when ASCE 31-03 was published). Our evaluations found that the seismic performance of the structure has been fair. The 1992 retrofit efforts improved the lateral load carrying capacity and load transfer paths. There are some deficiencies in the retrofit that allow for discontinuous load transfer. The details of our seismic evaluation and our recommended repairs for improving the seismic performance are included in in the appendix D.

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 20

OBSERVATIONS
On November 10, 2021, Walker Consultants performed a condition assessment of the North Pier Parking Structures. The assessment consisted of a visual review of representative exposed structural elements (columns, beams, walls,) and waterproofing elements (sealants and expansion joints). Our assessment also included chain dragging and hammer sounding of representative areas to identify concrete delaminations and possible corrosion of the embedded steel reinforcement. In addition, a limited visual review of the structures’ façade was performed from the Ground level.

The following conditions were noted. The referenced photographs are included in Appendix A.

Village Level
 Typical Village Level soffit slab deterioration and spalls with exposed and corroded reinforcement (Photos

1.1 and 1.4).

Pier Level
 Isolated concrete overlay deterioration with exposed reinforcement was observed on the Pier level (Photos 1.5 to 1.6).
 Typical Pier Level soffit slab deterioration and spalls with exposed and corroded reinforcement (Photos

1.7 and 1.8).
 Typical beam deterioration with exposed and corroded reinforcement was observed on the Pier Level (Photos 1.9 to 1.11).
 Isolated concrete curb delamination was observed at perimeter and interior of the parking structure (Photos 1.12 to 1.13).
 Typical sections of the perimeter barrier system posts particularity in the west end of the Pier Level are significantly corroded or damaged (Photos 1.14).
 The epoxy-based traffic coating was in poor condition with excessive wearing where the coating has worn into the base coat with some areas worn completely through the coating to the concrete substrate (Photos 1.15).
 Typical corroded steel beam ledge on the Pier Level of the parking structure (Photos 1.16).

Basement Level
 Typical concrete wall delamination and spalling with exposed rebar on the Basement Level (Photos 1.17 and 1.18).
 Typical beam deterioration with exposed and corroded reinforcement was observed on the Basement Level (Photos 1.19 and 1.20).
 Typical wall cracks were also observed on the Basement Level (Photo 1.21).

Exteriors
 Typical signs of rebar corrosion were observed east elevation of the parking structure (Photo 1.22).  Typical spandrel beam deterioration with exposed and corroded reinforcement was observed on north and east elevations of the parking structure (Photo 1.23 to 1.25).

LIMITATIONS
This report contains the professional opinions of Walker Consultants based on the conditions observed as of the date of our site visit and documents made available to us by the City of Redondo Beach (Client). This report is believed to be accurate within the limitations of the stated methods for obtaining information.

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 21
We have provided our opinion of probable costs from visual observations and field survey work. The opinion of probable repair costs is based on available information at the time of our condition appraisal and from our experience with similar projects. There is no warranty to the accuracy of such cost opinions as compared to bids or actual costs. This condition appraisal and the recommendations therein are to be used by Client with additional fiscal and technical judgment.

It should be noted that our renovation recommendations are conceptual in nature and do not represent changes to the original design intent of the structure. As a result, this report does not provide specific repair details or methods, construction contract documents, material specifications, or details to develop the construction cost from a contractor.

Based on the agreed scope of services, the condition appraisal was based on certain assumptions made on the existing conditions. Some of these assumptions cannot be verified without expanding the scope of services or performing more invasive procedures on the structure. More detailed and invasive testing may be provided by Walker Consultants as an additional service upon written request from Client.

The recommended repair concepts outlined represent current generally accepted technology. This report does not provide any kind of guarantee or warranty on our findings and recommendations. Our condition appraisal was based on and limited to the agreed scope of work. We do not intend to suggest or imply that our observation has discovered or disclosed latent conditions or has considered all possible improvement or repair concepts.

A review of the facility for Building Code compliance and compliance with the Americans with Disabilities Act (ADA) requirements was not part of the scope of this project. However, it should be noted that whenever significant repair, rehabilitation, or restoration is undertaken in an existing structure, ADA design requirements may become applicable if there are currently unmet ADA requirements. Similarly, we have not reviewed or evaluated the presence of or the subsequent mitigation of hazardous materials, including, but not limited to, asbestos, and PCB. In addition, seismic evaluation of the subject parking structure for compliance with the current building code was not part of the scope of this project.

This report was created for the use of Client and may not be assigned without written consent from Walker Consultants. The use of this report by others is at their own risk. Failure to make repairs recommended in this report in a timely manner using appropriate measures for safety of workers and persons using the facility could increase the risks to users of the facility. The client assumes all liability for personal injury and property damage caused by current conditions in the facility or by construction, means, methods, and safety measures implemented during facility repairs. Client shall indemnify or hold Walker Consultants harmless from liability and expense, including reasonable attorney’s fees incurred by Walker Consultants as a result of Client’s failure to implement repairs or to conduct repairs in a safe and prudent manner.

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00` June 06,2022
WALKER CONSULTANTS | 22
TABLE 2- Executive Summary – 5 Year Budget Forecast

PARKING CONDITION ASSESSMENT - UPDATE
North-Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06,2022

WALKER CONSULTANTS | 23
TABLE 3– North Pier Parking Structure– 5 Year Budget Forecast

PARKING CONDITION ASSESSMENT - UPDATE
North-Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 06,2022

WALKER CONSULTANTS | 24
TABLE 4–Opinion of Probable Seismic Restoration Repair costs Work Item Description
Estimated
Cost

1.00 General Conditions

1.10 Mobilization & General Conditions $25,000

2.00 Seismic Structural Repairs

2.01 Install (24) new drilled piers $100,000

2.02 Install (5) new concrete shear walls at Pier and Basement Level $500,000

2.03 Addition of carbon fiber wrapping at Line 3 and X at waffle shear wall at Pier Level $30,000

2.04 Addition of shear wall drag reinforcement at Village Level at line Z.1 $25,000

2.05 Addition of carbon fiber wrap at precast double tee stems (Village & Pier Level) near line Z $30,000

2.06 Addition of carbon fiber wrap at CIP Shear walls ends for confinement at line 11 at the Pier Level, at Line Z at CIP columns at lines 2, 3, 5, and 6 at Pier Level $25,000

2.07 Thickening of CIP shear wall at line Z (2-3) at Basement Level $25,000

2.08 Thickening of CIP shear wall at line Z (5-6) at Basement Level $25,000

2.09 Thickening of CIP shear walls at line 3 at Basement Level $35,000

2.10 Thickening of CIP shear wall at line X (4-11) at Basement Level $170,000

2.11 Thickening of CIP shear wall at line 11 (at grid Y) at Pier Level $35,000

2.12 Addition of slab reinforcement at Shear walls (East-West direction) at Village and Pier Level (i.e., chord/drag reinforcement, and shear transfer reinforcement) $200,000

2.13 Addition of slab reinforcement at Shear walls (North-South direction) at Village and Pier Level (i.e., chord/drag reinforcement, and shear transfer reinforcement) $200,000

2.14 Strengthen CIP column at Grid line 3 and Z at Pier Level $25,000 Repair Subtotal $1,450,000
Recommended Contingency (10%) $145,000
Engineering Services $160,000
Geotechnical Recommendations on Soil
condition at the project site $50,000
Building Survey Elevations $15000
Project Total $1,820,000

PARKING CONDITION ASSESSMENT - UPDATE
North-Pier Parkitructure | Redondo Beach, CA
WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 25
TABLE 5– North Pier Parking Structure– 10 Year Budget Forecast NO. WORK DESCRIPTION 10-YEAR TOTAL COST

1.00 General Conditions $ 246,500

1.1 General Conditions / Mobilization $ 246,500 61,000 50,500 43,500 21,000 15,000 35,500 20,000

2.00 Immediate Repairs $ 6,000

2.1 Remov e and Replace barrier system (South - West
Corner) $ 6,000 $ 6,000

3.00 Structural / Concrete Repairs $ 556,500

3.1 Ov erhead Ceiling Repair $ 345,000 $ 225,000 $ 45,000 $ 75,000

3.2 Concrete Floor Repair - Supported lev els $ 25,000 $ 25,000

3.2a Ov erhead Ceiling Repair - PCP $ 80,500 $ 52,500 $ 10,500 $ 17,500

3.3 Concrete Wall, Beam, Column Repair (Primarily Beams) $ 75,000 $ 75,000

3.3a Concrete W al,Beam,Column Repair-PCP $ 21,000 $ 10,500 $ 3,500 $ 7,000

3.4 Epoxy injection at concrete beams (Western side) $ 10,000 $ 10,000

4.00 Waterproofing $ 732,000

4.1 Rout/Seal Cracks $ 40,000 $ 40,000

4.2 Construction Joint Sealants $ 32,000 $ 32,000

4.3 Remov e and Replace Traffic Coating - Pier Lev el $ 396,000 $ 132,000 $ 132,000 $ 132,000

4.4 Traffic Coating - Recoat - Village Lev el $ 264,000 $ 132,000 $ 132,000

5.00 Stair Tower Repair $ 40,000

5.1 Paint Stairs $ 40,000 $ 20,000 $ 20,000

6.00 Mechanical / Electrical / Plumbing $ 150,000

6.1 Clean Floor Drains and Piping $ 10,000 $ 5,000 $ 5,000

6.2 Electrical Allowance $ 70,000 $ 35,000 $ 35,000

6.3 Mechanical Allowance $ 70,000 $ 35,000 $ 35,000

7.00 Architectural / Miscellaneous $ 150,000

7.1 Paint Misc. Metals and Equipment $ 38,000 $ 38,000

7.2 Paint Select Soffit/Walls/Columns Locations $ 54,000 $ 54,000

7.3 Re-Paint Traffic Markings $ 28,000 $ 7,000 $ 7,000 $ 7,000 $ 7,000

7.5 Concrete Curb $ 30,000 $ 30,000

8.00 Risk Management $ 13,500

8.1 Guardrail Post (Barrier Cable) (North and East side on Pier Lev el) $ 13,500 $ 13,500
5-YEAR TOTAL COST 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Sub Total $ 1,894,500 $ 465,000 $ 386,500 $ 333,500 $ - $ 160,000 $ - $ 114,500 $ - $ 269,500 $ 152,000 Contingency 10% $ 189,000 $ 46,500 $ 39,000 $ 33,500 $ - $ 16,000 $ - $ 11,500 $ - $ 27,000 $ 15,500 Consulting & Engineering Fees $ 189,000 $ 46,500 $ 39,000 $ 33,500 $ - $ 16,000 $ - $ 11,500 $ - $ 27,000 $ 15,500 Opinion of Annual Budget ( Dollars) $ 2,272,500 $ 558,000 $ 464,500 $ 400,500 $ - $ 192,000 $ - $ 137,500 $ - $ 323,500 $ 183,000 Opinion of Annual Budget (Adjusted Future Va$lue) 2,491,000 $ 558,000 $ 478,500 $ 424,900 $ - $ 216,100 $ - $ 164,200 $ - $ 409,900 $ 238,800 $ 21,000
2022 2023 2024 2025 2026
$ 61,000 $ 50,500 $ 43,500 $ -
$ 6,000 $ - $ - $ - $ -
$ - $ 20,000 $ - $ - $ -
$ - $ 204,000 $ 132,000 $ - $ 132,000
2027
$ -
$ - $ 13,500 $ - $ - $ -
$ - $ 37,000 $ 99,000 $ - $ 7,000
$ 398,000 $ - $ 59,000 $ - $ -
$ -
$ -
$ - $ 75,000 $ - $ - $ - $ -
$ -
2029
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
2028
$ -
$ -
$ -
$ -
$ 15,000
$ -
$ 99,500
$ -
$ -
2031
$ 20,000
$ -
$ -
$ 132,000
$ -
$ -
$ -
$ -
$ 20,000
$ 75,000
$ 7,000
2030
$ 35,500
$ -
$ -
$ 132,000

A PHOTOGRAPHS

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA
WALKER PROJECT No.37-009397.00 June 6, 2022
APPENDIX-A: PHOTOGRAPHS | A-0

1.NORTH PIER PARKING STRUCTURE

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA
WALKER PROJECT No.37-009397.00 June 6, 2022
APPENDIX-A: PHOTOGRAPHS | A-1
Photo 1.1- Soffit slab deterioration and spall with exposed reinforcement, Village Level (SH3-79) Photo 1.2- Soffit slab deterioration and spall with exposed reinforcement, Village Level (SH3-87)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA
WALKER PROJECT No.37-009397.00 June 6, 2022
APPENDIX-A: PHOTOGRAPHS | A-2
Photo 1.3- Soffit slab deterioration and spall with exposed reinforcement, Village Level (SH3-96)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA
WALKER PROJECT No.37-009397.00 June 6, 2022
APPENDIX-A: PHOTOGRAPHS | A-3
Photo 1.4- Soffit slab deterioration and spall with exposed reinforcement, Village Level (SH3-98) Photo 1.5- Concrete floor delamination, Pier Level (SH3-229)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA
WALKER PROJECT No.37-009397.00 June 6, 2022
APPENDIX-A: PHOTOGRAPHS | A-4
Photo 1.6- Concrete delamination with exposed rebar, Pier Level (SH3-206) Photo 1.7- Soffit slab deterioration and spall with exposed reinforcement, Pier Level (SH3-312)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA
WALKER PROJECT No.37-009397.00 June 6, 2022
APPENDIX-A: PHOTOGRAPHS | A-5
Photo 1.8- Soffit slab deterioration and spall, Pier Level (SH3-267) Photo 1.9- Concrete beam spalls with exposed reinforcement, Pier Level (SH3-31)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA
WALKER PROJECT No.37-009397.00 June 6, 2022
APPENDIX-A: PHOTOGRAPHS | A-6
Photo 1.10- Concrete beam spall, Pier Level (SH3-201)
Photo 1.11- Concrete beam spall, Pier Level (SH3-197)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA
WALKER PROJECT No.37-009397.00 June 6, 2022
APPENDIX-A: PHOTOGRAPHS | A-7
Photo 1.12- Concrete curb spall, Pier Level (SH3-35)
Photo 1.13- Concrete curb spall, Pier Level (SH3-189)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA
WALKER PROJECT No.37-009397.00 June 6, 2022
APPENDIX-A: PHOTOGRAPHS | A-8
Photo 1.14- Corroded barrier post, Pier Level (SH3-192) Photo 1.15- Compromised traffic coating, Pier Level (SH3-211)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA
WALKER PROJECT No.37-009397.00 June 6, 2022
APPENDIX-A: PHOTOGRAPHS | A-9
Photo 1.16- Corroded beam ledge, Pier Level (SH3-136)
Photo 1.17- Exposed rebar on wall, Basement Level (SH3-308)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA
WALKER PROJECT No.37-009397.00 June 6, 2022
APPENDIX-A: PHOTOGRAPHS | A-10
Photo 1.18- Exposed rebar on wall, Basement Level (SH3-308) Photo 1.19- Concrete beam spall with exposed rebar, Basement level (SH3-303)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA
WALKER PROJECT No.37-009397.00 June 6, 2022
APPENDIX-A: PHOTOGRAPHS | A-11
Photo 1.20- Concrete beam spall, Basement Level (SH3-271) Photo 1.21- Concrete wall crack, Basement Level (SH3-256)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA
WALKER PROJECT No.37-009397.00 June 6, 2022
APPENDIX-A: PHOTOGRAPHS | A-12
Photo 1.22 - Visual signs of rebar corrosion, Exterior - West elevation (SH2-343) Photo 1.23- Concrete spandrel beam spall with exposed rebar, Exterior - North elevation (SH2-356)

PARKING CONDITION ASSESSMENT - UPDATE
North Pier Parking Structure | Redondo Beach, CA
WALKER PROJECT No.37-009397.00 June 6, 2022
APPENDIX-A: PHOTOGRAPHS | A-13
Photo 1.24- Concrete spandrel beam spall with exposed rebar, Exterior – North-east elevation (SH2-362) Photo 1.25- Concrete cantilever spandrel beam exposed rebar, Exterior – East elevation (SH2-372)

B MATERIAL TESTING

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
1 | M A T E R I A L T E S T I N G

CONCRETE TESTING AND ANALYSIS
Walker Consultants conducted material testing on several concrete components of the North Pier Parking Structure in 2012 to check the as-built condition and to use their properties for seismic evaluation. However, testing was only performed at the Pier level. The Basement level in 2012 was occupied by the Redondo Beach Fun Factory, which provided a play area for children and families, and was not accessible for testing. The Fun Factory closed in 2017 and the Basement level is now vacant. This has provided an opportunity to conduct additional testing on the structure to obtain information on the original walls of the building at the Basement level. With the approval of the City of Redondo Beach, Walker conducted the following additional testing on the North Pier Parking Structure.

1. Coring of concrete walls to obtain compressive testing

2. Exploratory opening of concrete walls to check size and placement of steel reinforcement Slater Waterproofing Inc. was engaged to obtain concrete cores and to perform destructive opening on January 12 and 13, 2022 under the direction of Walker staff. Concrete cores were sent to Universal Construction Testing (UCT) for laboratory testing to obtain compressive strength. The lab report prepared by UCT is attached in Appendix C. Ground Penetrating Radar (GPR) was also used on concrete surfaces at test locations prior to destructive opening to locate the embedded rebar and to prevent cutting rebar during the coring process.

COMPRESSIVE STRENGTH
As stated previously, the North Pier Parking Structure was built around 1962. Due to the age of the structure, the original plans were not available for our review. However, we have received a set of as-built plans for the 1992 seismic retrofit of the structure prepared by Theodore E. Anvick (Structural Consulting Engineer) which was dated October 1, 1992. While these plans have adequate information on the added retrofit concrete elements, they do not have any information on the original concrete walls of the structure. Therefore, Walker concrete coring was focused on the original walls of the building. Overall, 15 concrete cores were obtained of which 11 cores were taken from the original concrete walls in the Basement. We also obtained 4 cores from the added concrete walls in 1992 to compare with the compressive strength specified in the 1992 structural drawing. Concrete strength is known to increase with time. An increased concrete strength (expected value) will enhance the wall capacity in resisting earthquake loads and can reduce the extent of the retrofit scheme that might be required to add to the structure for complying with the current seismic standard.

Locations of concrete cores are shown in Figures 2.1 and 2.2. The compressive strength of the selected structural members is shown in Table 1. These compressive strengths were used in our Tier 2 seismic evaluation. Typical photos of coring are shown in photos 2.1 through 2.9.

Compressive strength testing was performed in general conformance with ASTM C 39.

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
2 | M A T E R I A L T E S T I N G
Table 1 – Summary of Compressive Strength Test Results
Core # Parking
Level Location Wall Type Compressive Strength psi
1 Basement West Wall Original Construction -
1962 6440
2 Basement West Wall Original Construction -
1962 5590
3 Basement West Wall Original Construction -
1962 8530
4 Basement Kitchen Wall (E-W) Original Construction -
1962 6730
5 Basement Kitchen Wall (E-W) Original Construction -
1962 6600
6 Basement Kitchen Wall (E-W) Original Construction -
1962 5400
7 Basement Kitchen Wall (E-W) Original Construction -
1962 5090
8 Basement West Wall Original Construction -
1962 5960
9 Basement West Wall Original Construction -
1962 8630
10 Basement South Wall Original Construction -
1962 7330
11 Basement South Wall Original Construction -
1962 5440
12 Basement South Wall Retrofit Wall - 1992 6210
13 Basement South Wall Retrofit Wall - 1992 8620
14 Pier South Wall Retrofit Wall - 1992 7010
15 Pier South Wall Retrofit Wall - 1992 7880

EXPLORATORY OPENING OF CONCRETE WALLS
We also performed destructive testing to expose the steel reinforcement in the concrete walls for measuring bar sizes and spacings. Overall, we exposed steel reinforcement at 8 locations on the walls of which 5 were on the original concrete walls in the Basement. We also exposed 3 locations on the second floor retrofit waffle walls to check the presence of confinement steel in the wall diagonal members. Locations of destructive openings are shown in Figures 2.1 and 2.2. Steel reinforcement sizes and spacings measured during testing are shown in Table 2 and Figures 2.3 and 2.4. During our investigation of the wall opening, we did not observe any significant sign of rusting and deterioration on the exposed bars. Wall steel reinforcement were generally in good condition. We

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
3 | M A T E R I A L T E S T I N G
also performed GPR on two of the 1992 retrofit walls at the south end of the parking structure. GPR readings showed that the rebar spacing in these walls generally conform with spacing specified in the 1992 retrofit drawings. Rebar sizes and spacings listed in Table 2 were used in our Tier 2 seismic evaluation. Photos 2.10 – 2.17 show typical reinforcement observed at some of the destructive wall openings.

Table 2 – Summary of Reinforcement Found at Destructive Opening Locations DT# Level Location Wall Type Gridlines
Approximate
Dimensions of
opening
Wall
Thickness
Measured
(in)
Steel Reinforcement Found at
Destructive Opening Notes
1 Basement West Wal
(N-S)l
Original
Construction - 1962 X1-3.0 Circular (3" Diam. x 3.5" Depth) 8 Ver: #6 @ 6" O.C.

Hor: #5 @ 18" O.C
One Layer rebar was
found at the middle
of the wall thickness
2 Basement West Wall
(N-S)
Original
Construction - 1962 X-10.2 2 Squares of 4" x 4" 8
Ver: #6 @ 6" O.C.

Hor: #5 @ 18" O.C.

One Layer rebar was
found at the middle
of the wall thickness
3 Basement South Wall
(E-W)
Original
Construction - 1962 11-X.8 2" x 29" 10 Ver: #6 @ 12" O.C. - 2" CoverHor: #4 @ 18.5" O.C. - 2.75" Cover Two Layer rebar was
found (one at each
face)
4 Basement Kitchen
Wall (E-W)
Original
Construction - 1962 3-Y.3 2 Squares of 4" x 6" & 4" x 11" 24 Ver. Bar in the Field of Wall: #4 @ 18"
O.C. - 3.125" Cover
Ver. Bar at Jamb: #10 @ 6" - 3.5"
Cover
Hor: #4 @ 12" O.C. - 2.75" Cover - 2.5"
Cover
Vertical Jamb Steel:
9 #10 bars
(3 layers of 3 #10 )
5 Basement Kitchen
Wall (E-W)
Original
Construction - 1962 3-Y.9 1 Square of 5" x 5" 24
Ver: Inconclusive for vertical due to
access and interference from pie
when using GPR.

Hor: #4 @ 12" O.C. - 2.75" Cover - 2.5"
Cover
Use the same
reinforcement
found in the other
kitchen wall
6 Pier North Wall
(E-W)
Retrofit Waffle Wall
- 1992 3-Y.2 4" x 17" 12
Found 2 #6 longitudinal bar @ 8" O.C.
along diagonal members - Cover 3.5"
No confinement bar was found
Bar was coated
7 Pier North Wall
(E-W)
Retrofit Waffle Wall
- 1992 3-X.8 6" x 24" 12
Found 2 #6 longitudinal bar @ 8" O.C.
along diagonal members - Cover 2.5"
No confinement bar was found
Bar was coated
8 Pier West Wall
(N-S)
Retrofit Waffle Wall
- 1992 X-4.2 8" x 24" 12
Found 2 #6 longitudinal bar @ 8" O.C.
along diagonal members- Cover 2.5"
No confinement bar was found
Bar was coated

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
4 | M A T E R I A L T E S T I N G

2. CONCRETE TESTING PHOTOS

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
5 | M A T E R I A L T E S T I N G
Photo 2.1- Detecting wall steel reinforcement using GPR, West Wall, 1962 Construction - Basement (BA2-9) Photo 2.2- Detecting waffle wall steel reinforcement using GPR, East Wall, 1992 Retrofit – Pier Level (BA2-12)

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
6 | M A T E R I A L T E S T I N G
Photo 2.3- Wall steel reinforcement detected using GPR, only longitudinal bar was found, No confinement bar was present, East Wall, 1992 Retrofit – Pier Level (BA2-197) Photo 2.4- Wall steel reinforcement detected by GPR, South Wall Gridline 11, 1962 Construction - Basement (BA2-128)

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
7 | M A T E R I A L T E S T I N G
Photo 2.5- Concrete coring, West Wall, 1962 Construction - Basement (BA2-33) Photo 2.6- Concrete coring, West Wall, 1962 Construction - Basement (BA2-78)

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
8 | M A T E R I A L T E S T I N G
Photo 2.7- Concrete coring, Kitchen wall at gridline 3, 1962 Construction - Basement (BA2-102) Photo 2.8- Concrete coring, Kitchen wall at gridline 3, 1962 Construction - Basement (BA2-96)

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
9 | M A T E R I A L T E S T I N G
Photo 2.9- Typical concrete core, 3” diameter by 6” length, kitchen wall on gridline 3, 1962 Construction - Basement (BA2-224 and 226)

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
10 | M A T E R I A L T E S T I N G
Photo 2.10—Destructive wall location (DT3), South wall, 1962 Construction - Basement (BA2-404 Photo 2.11—Destructive wall location (DT4), Kitchen wall on gridline 3, 1962 Construction - Basement (BA2-568)

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
11 | M A T E R I A L T E S T I N G
Photo 2.12- Opening of diagonal members on waffle wall, Only # 6 longitudinal bar was found, No confinement bar was present, 1992 Retrofit Wall on Gridline 3– Pier Level (BA2-161) Photo 2.13- Opening of diagonal members on waffle wall, Only # 6 longitudinal bar was found, No confinement bar was present, 1992 Retrofit Wall on Gridline 3– Pier Level (BA2-178)

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
12 | M A T E R I A L T E S T I N G
Photo 2.14— Vertical rebar placement at destructive location (DT3), South wall, 1962 Construction - Basement (BA2-409)

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
13 | M A T E R I A L T E S T I N G
Photo 2.15— Horizontal #4 bar found at the wall destructive opening location DT3, South wall, 1962 Construction - Basement (BA2-344)
Photo 2.16— Vertical #10 bar found at wall jamb, destructive opening location DT4, Kitchen wall on gridline 3, 1962 Construction - Basement (BA2-580)

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
14 | M A T E R I A L T E S T I N G
Photo 2.17— Vertical bar concrete cover measurement at wall jamb, destructive opening location DT4, Kitchen wall on gridline 3, 1962 Construction - Basement (BA2-594)

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
15 | M A T E R I A L T E S T I N G

CONCRETE TESTING FIGURES

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
16 | M A T E R I A L T E S T I N G
Figure 2.1 Locations of Concrete Coring and Exploratory Concrete Openings – Basement Level C1 C3 C2
C4
C5
C6
C7
C8 C9
C10
C11
C12
C13
DT1
DT2
DT3
DT4 DT5
DT
Location of Concrete Core
Location of Destructive Opening

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
17 | M A T E R I A L T E S T I N G
Figure 2.2 Locations of Concrete Coring and Exploratory Concrete Openings – Pier Level C14
C15
DT6
DT7
DT8
DT
Location of Concrete Core
Location of Destructive Opening

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
18 | M A T E R I A L T E S T I N G
Figure 2.3 Steel reinforcement found at wall destructive openings – Basement Level 8 in. thick wall – 1962 Construction
Ver: #6 @ 6" O.C. (1 layer at the middle of wall thickness) Hor: #5 @ 18" O.C (1 layer at the middle of wall thickness) 10 in. thick wall - 1962 Construction
Ver: #6 @ 12" O.C. (2 layers)
Hor: #4 @ 18.5" O.C. (2 layers)
24 in. thick wall - 1962 Construction
Ver. Bar at Jamb: 9 #10 (3 layers of #10 @ 6" O.C.

Ver. Bar in the Field of Wall : #4 @ 18" O.C. (2 layers) Hor. Bar: #4 @ 12" O.C. (2 layers)
8 in. thick wall - 1962 Construction
Ver: #6 @ 6" O.C. (1 layer at the middle of wall thickness) Hor: #5 @ 18" O.C (1 layer at the middle of wall thickness)

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
19 | M A T E R I A L T E S T I N G
Figure 2.4 Steel reinforcement found at wall destructive openings – Pier Level 12 in. thick waffle wall – 1992 Retrofit
2 #6 longitudinal bar @ 8" O.C. along each face of diagonal members No confinement bar was found

C UTC REPORT

CHICAGO
7314 N. Milwaukee Avenue
Niles, IL 60714
PH: 847-459-9012
www.uctgroup.com
PROJECT NUMBER:

PROJECT NAME:

DATE:
22006
City of Redondo Beach – Compressive Strength- Final Report

02.08.2022
PAGE | 1
Mr. Behnam Arya, PhD, PE [email protected]
Walker Consultants
707 Wilshire Blvd, Suite 3650
Los Angeles, CA 90017
PH: 213.335.5191
Re: Compressive Strength of Concrete Core samples
City of Redondo Beach
North Pier Parking Structure
180 Coral Way,
Redondo Beach, CA 90277
Walker Consultants Project No. 37.009397.00
Dear Mr. Arya:

Enclosed please find the results of the compression strength of the fifteen (15) core samples delivered to our laboratories, that were reportedly extracted from the referenced structure and delivered to our laboratories on January 24, 2022.

The compressive strength was determined according to the applicable provisions of ASTM C39 “Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens”.

The concrete cores were identified by others.

The obtained test results are compiled below in Table 1. *******
We appreciate the opportunity to be of continued service to you.

Sincerely yours,
UCT Group LLC
Elena I. Emerson
Operations Manager

CHICAGO
7314 N. Milwaukee Avenue
Niles, IL 60714
PH: 847-459-9012
www.uctgroup.com
PROJECT NUMBER:

PROJECT NAME:

DATE:
22006
City of Redondo Beach – Compressive Strength- Final Report

02.08.2022
PAGE | 2
Table 1. Compressive Strength of Concrete Core Samples
(ASTM C 39)
Core
ID Location
Tested
Height L
(in)
Diam.

D
(in)
L/D
Ratio
K
Total
Load
(lbs)
Compressive
Strength
(psi)
Corrected
Compressive
Strength
(psi)
1 Basement, West Wall,
Gridlines X1-3.0 5.47 2.75 1.99

1.00 38,260 6,440 6,440
2 Basement, West Wall,
Gridlines X1-3.5 4.51 2.75 1.64

1.00 34,230 5,760 5,590
3 Basement, West Wall,
Gridlines X1-3.0 3.25 2.75 1.18

0.92 55,060 9,270 8,530
4 Basement, Kitchen Wall
(E-W), Gridlines 3-Y.2 3.48 2.75 1.27

0.93 43,020 7,240 6,730
5 Basement, Kitchen Wall
(E-W), Gridlines 3-Y.4 5.41 2.75 1.97

1.00 39,230 6,600 6,600
6 Basement, Kitchen Wall
(E-W), Gridlines 3-Y.8 5.47 2.75 1.99

1.00 32,060 5,400 5,400
7 Basement, Kitchen Wall
(E-W), Gridlines 3-Y.9 5.48 2.75 1.99

1.00 30,260 5,090 5,090
8 Basement, West Wall,
Gridlines X2-10.2 5.48 2.75 1.99

1.00 35,410 5,960 5,960
9 Basement, West Wall,
Gridlines X2-10.4 5.18 2.75 1.88

1.00 51,290 8,630 8,630
10 Basement, South Wall,
Gridlines 11-X.8 5.40 2.75 1.96

1.00 43,540 7,330 7,330
11 Basement, South Wall,
Gridlines 11-X.9 5.39 2.75 1.96

1.00 32,320 5,440 5,440
12 Basement, South Wall,
Gridlines 11-Y.4 5.48 2.75 1.99

1.00 36,890 6,210 6,210
13 Basement, South Wall,
Gridlines 11-Y.5 5.41 2.75 1.97

1.00 51,200 8,620 8,620
14 Pier, South Wall, gridlines
11-Y.8 5.43 2.75 1.97

1.00 41,650 7,010 7,010
15 Pier, South Wall, gridlines
11-Y.9 5.40 2.75 1.96

1.00 46,820 7,880 7,880
Remarks: The cores were tested in air-dry conditions.

SEISMIC EVALUATIONS D

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
1 | M A T E R I A L T E S T I N G

PROJECT UNDERSTANDING
The Redondo Beach North Pier Parking Structure was built in 1962 (see Photo 3.1 and 3.2) and is evaluated based on its current structural capacities. The structure is experiencing significant corrosion-based deterioration, exacerbated by its marine location. Walker was contracted in 2011, and our field investigation identified potential deficiencies with the North Pier parking structure. The City again contracted Walker in 2021 to perform Tier 2 Seismic Evaluation of the North Pier Parking Structure to advise the City as to its structural integrity for seismic and gravity loading, and viable repair alternatives. This summary report will provide findings of our most recent field investigation work in 2021-2022.

SCOPE OF SERVICES
As stated previously, the North Pier Parking Structure was built around 1962. Due to the age of the structure, the original plans were not available for our review. However, we have received a set of as-built plans for the 1992 seismic retrofit of the structure prepared by Theodore E. Anvick (Structural Consulting Engineer) which was dated October 1, 1992. While these plans have adequate information on the added retrofit concrete elements, they do not have any information on the original concrete walls of the structure.

Walker completed a Tier 1 building screening procedure and Tier 2 seismic evaluation in 2021-2-22 based on guidelines established in the nationally recognized publication ASCE 41-17 “Seismic Evaluation of Exiting Buildings”. Tier 1 building screening of 2011, performed by Walker, of North Parking Structure identified potential deficiencies in: vertical discontinuity of the lateral force resisting system, torsional stability, deterioration of structural members, and undefined foundation capacity. In order to confirm if the structural deficiencies exist relative to acceptable seismic performance of the structure, the ASCE 31-03 and ASCE 41-06 code requirements and performance acceptance criteria were used in 2012 edition of our report. Since 2012 ASCE has further enhanced the performance acceptance criteria for existing buildings in high seismicity areas. For the current study, the latest edition of ASCE 41-17 is used by Walker and like ASCE 31-03 it also requires structural engineers to perform a deficiency-based seismic evaluation study based on a Tier 2 procedure. This process of deficiencybased evaluation of individual structural elements against maximum demand of force or displacement that can be imposed by the system overall and their corresponding performance will likely determine if the parking structure has adequate strength to resist seismic forces at the inelastic level and determine areas where structural strengthening is required to extend the useful service life of the structure.

It is also important to note that there is an overall increase in seismic demand between the two code models of ASCE 41-06 and ASCE 41-17. Changes are associated with the updates made in seismic parameters established by USGS related to new research on seismic ground motions in the continental US and how soils in high seismicity areas can propagate inertial forces with different earthquake intensities and their associated return periods.

Existing structures that were checked previously on the basis of ASCE 41-06 and ASCE 31-03 and have borderline satisfied the performance objective levels of ASCE 31-03 will likely not satisfy the performance objective criteria of ASCE 41-17 as the force or displacement demand of ASCE 41-17 are significantly higher from ASCE 41-06.

Recommended repairs at the North Pier Parking Structures are based on the performance acceptance criteria of ASCE 41-17.

SUMMARY OF TIER-2 SEISMIC EVALUATION PER ASCE 41-17
Walker Consultants has completed the Tier-2 Seismic Evaluation of North Pier Parking Structure on the basis of ASCE 41-17. We have evaluated the parking structure using field investigations employing both destructive and non-destructive methods. Based on the findings of field investigative work, we have performed a 3-D finite element computer analysis model of the garage and have checked the structural adequacy of existing lateral load resisting elements. We recommend the following:

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
2 | M A T E R I A L T E S T I N G

SEISMIC REPAIRS REQUIRED
Walker identified the following conditions where seismic repairs should be performed:

1. Add (1) new 21ft long concrete shear wall at line 3 near grid line Z at the Pier Level. The addition of new shear wall will eliminate the discontinuity of shear wall that currently exists as there is a 21ft long shear wall at the Basement Level that was built in 1962 and was part of the original design. The addition of new shear wall at line 3 near line Z will also reduce demand on line 3 existing shear wall at grid line Y at the Pier Level, which is currently showing signs of an overstressed condition in both flexure and shear (See Photo 3.4 and 3.9)

2. Add (1) new 21ft long concrete shear walls at line 7 near line X and (1) new shear wall at line 7 near line Z at the Pier and Basement level. The addition of two new shear walls at line 7 (at Pier and Basement level) will possibly reduce the shear overstress condition of existing shear walls at line 3 and at line 11 at the Pier and Basement level. Future detailed analysis with the addition of new shear walls will be performed in the next phase when seismic restoration phase of the project will be approved by the City. Optimal location of new shear walls apart from line 3 shear wall will be finalized in the next phase. For cost estimation purposes, addition of new shear walls at line 7 is quite reasonable to determine potential costs associated with addition of new shear walls inside garage.

3. Addition of (24) new foundation drilled piers and wall footing at line 7 to support two new shear walls.

4. Strengthening of existing waffle shear wall at line 3 and line Y at the Pier Level as the diagonal braces of existing waffle shear wall are deficient in both axial compression and tension. This condition will improve once the new shear walls are going to be added at line 3 and at line 7 (See Photo 3.5).

5. Strengthening of existing top chord of the waffle shear wall at line Z.1 at the Village level. Addition of new chord reinforcement is required at the Village level (See Photo 3.14).

6. Strengthening of existing double tee stems at waffle shear wall ends at line Z.1 at the Village and Pier level (See Photo 3.15).

7. Strengthening of Shear walls ends to meet ASCE 41-17 confinement reinforcement. X (2-3) and (5-6) to meet requirement of ASCE 41-17 code force limit (See Photo 3.16).

8. Thickening of existing shear wall is required at line X at the Basement level from line 4 to 11 (See Photo

3.13)

9. Thickening of existing shear wall is required at line Z (basement level) from line (2 – 3) and (5 – 6) (See Photo 3.16).

10. Thickening of existing shear walls is required at line 3 at the Basement level. Add horizontal reinforcement at Basement level shear walls along line 3 (see Photo 3.4) where existing shear walls reinforcement in horizontal direction doesn’t meet the ASCE 41-17 and ACI 318-14 minimum wall requirement.

11. Add new slab reinforcement at shear walls oriented in the East-West direction at Village and Pier Level at line 3, 7, and 11 (See Photo 3.5, 3.8, and 3.13).

12. Add new slab reinforcement at waffle shear walls at line X and Z.1 at Village Level (See Photo 3.6 and 3.7).

13. Strengthen CIP column at line 3 and Z at Pier Level (See Photo 3.9).

14. Obtain recommendations from a registered Geo-technical engineer to evaluate current soil conditions and associated risk of having soil liquefaction, slope stability failure, and surface fault rupture at the garage site.

15. Obtain building spot elevations at corners and at intermediate points along the length of the garage to monitor any potential movement of garage foundations both vertically and horizontally. The City should contract with a licensed professional surveyor to perform this task.

Although the parking structure was functional at the time of our field investigation, over its life it has experienced several moderate earthquakes which may have softened the structure internally. North Pier parking structure is located very close to active seismic fault lines which can produce an earthquake of M6.0 to 7.0 on a Richter scale.

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
3 | M A T E R I A L T E S T I N G
Over the last fifty years, the City of Redondo Beach has experienced several earthquakes with magnitude 5.0 to

6.0+. Seismic records of Southern California show that those earthquakes have relatively short return period.

Completing the necessary repairs would ensure that the garage would provide “Basic Life Safety Structural Performance” under a moderate seismic event and “Basic Collapse Prevention Structural Performance” under a severe seismic event. At present several structural elements of the parking structure in their current form do not satisfy the performance objectives of both the Life Safety and Collapse Prevention structural performance criteria of ASCE 41-17.

Our opinion of probable seismic restoration repair costs is $1,820,000.00, including a recommended construction contingency and engineering services. Our opinion is based on estimated repair quantities based on our analysis work and historical records of similar types of work. Cost may vary due to procurement method, local economy, phasing, or other factors. Additional engineering services are required to prepare repair documents that can be used to bid and execute the recommended repairs. Figure 3.1, 3.2, and 3.3 show locations of seismic structural repairs on Basement, Pier, and Village Levels respectively. An additional breakdown of the probable repair costs is presented in Table D1.

TIER 2 SEISMIC EVALUATION FINDINGS
In investigating and performing the Tier-2 Seismic Evaluation in accordance with ASCE 41-17 of the North Pier Parking Structure, we found the following:

The North Pier Parking Structure is adequate to provide “Basic Life Safety Structural Performance” under the application of code specified gravity and ASCE 41-17 BSE-1E level seismic loads and “Basic Collapse Prevention Structural Performance” under the application of code specified gravity and ASCE 41-17 BSE-2E level seismic loads.

We have not observed any structural cracking in slabs, beams, columns, and walls due to an over-stress condition caused be excessive amount of gravity and seismic loads resisted by these elements during its service life of past 10 years. There is no visible cracking and spalling of concrete associated with corrosion of rebars. No visible cracking in slabs, beams, columns, or walls was observed that can be associated with foundation settlement or overstress condition of foundation elements. Seismic retrofits of 1992 are performing well and have improved the flow of seismic forces from diaphragm to lateral load resisting elements and subsequently to the garage foundation system. As mentioned above that the seismic loads specified in ASCE 41-17 are significantly higher than the seismic loads specified in ASCE 31-03. Due to the increase in forces that were used in 2012 to verify the adequacy of members, there are several locations where the structural capacity of existing shear walls, waffle shear wall diagonal braces, and chord and drag reinforcement near shear walls are no longer meeting the force demands of ASCE 41-17 and therefore do not satisfy the performance objectives of both the Life Safety and Collapse Prevention structural performance criteria of ASCE 41-17.

Walker Consultants has completed both the Tier 1 and 2 seismic evaluations of North Pier Parking Structure. Tier 1 evaluations were performed first in 2021. Tier 1 building screening process was used as the basis for Tier 2 seismic evaluation that was performed by Walker in 2022.

GARAGE DISCRIPTION
Parking Facility at North Pier – Redondo Beach is composed of two supported level parking structure. The existing parking structure is made up of cast-in-place concrete columns and walls, both cast-in-place and precast beams and cast-in-place topping slab placed over precast double tees at the supported levels. The lateral load resisting system for the existing parking structures consists of concrete shear walls in two orthogonal directions. Concrete shear walls are supporting small to negligible tributary area of the supported precast double tee system and can be classified as Bearing Wall System on a conservative basis in both directions. The current analysis provides comprehensive information on the design adequacy related to the seismic upgrades performed in 1992 plus the

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
4 | M A T E R I A L T E S T I N G
overall stability, integrity, and redundancy of the structure to withstand garage vertical loads, seismic loads on the basis of ASCE 41-17.

The foundation system for the existing parking structure is composed of spread, strip and drilled pier foundation system. We have no structural information on the size and reinforcement of foundation elements. We have no documentation, if any foundation upgrades were made in the past to address any foundation issues related to distribution of gravity and seismic loads due to the modifications made over the life of the structure. Review of the foundation system is based strictly on the basis of field investigations limited to visual observations. At present, we didn’t obtain any new soils investigation report for this project site. Lateral seismic loads at the foundation level will be resisted by passive pressure against the face of the spread, strip and drilled pier caps in conjunction with the allowable lateral frictional resistance at the bottom of spread and strip footings and lateral load resistance capacity of drilled piers. Differential settlement of the structure has already taken place and is not noticeable. No cracking of structural elements is being observed that can be associated with any recent foundation movement.

DESIGN SUPERIMPOSED LOADS
In addition to dead loads, the structure is checked for the following superimposed live loads, with no live load reductions taken in accordance with CBC section 1607:

Light vehicle storage 40 psf
Landscaping None required
Heavy vehicles None required
Snow Load None required
TIER 2 SEISMIC EVLAUTION REQUIREMENTS
The Tier 2 seismic evaluation uses a three-step approach.

1. Induced earthquake forces: Analyze the structure for pseudo lateral forces using Linear Static Procedure (LSP) of ASCE 41-17.

2. Verify structural irregularities and perform Dynamic Analysis using Linear Dynamic Procedures (LDP) of ASCE 41-17.

3. Generate member forces for each structural element using load combinations of ASCE 41-17.

An evaluation of the effects of a seismic event on the structure is performed. We have computed floor masses for each level to determine mass distribution and inertia properties. Frame member geometry, material and section properties for various member sizes and concrete strengths are obtained from field investigative work to calculate frame stiffness. Once stiffness and mass inertia properties are defined, static and dynamic analysis are performed to determine mode shapes and associated periods to use in the lateral analysis.

Lateral loads are calculated according to ASCE 41-17 and applied at 5% of the structure dimension on either side of the center of mass to include the effects of accidental torsion in the garage. The criteria from the ASCE used to check the adequacy of this structure are explained in the Lateral Section of these calculations.

In a building with special concrete shear wall lateral load resisting system, concrete shear walls resist 100% of the lateral loads in accordance with ASCE 7-16 (i.e., ASCE 41-17 BSE-2N) equivalent lateral force procedure or response spectrum analysis approach. Structures designed in conformance with such provisions and principles are expected to be able to;(1) resist minor earthquakes without damage; (2) resist moderate earthquakes without structural

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
5 | M A T E R I A L T E S T I N G
damage, but with some nonstructural damage; and (3) resist major or severe earthquakes without major failure of the building or its component members and would perform such that it would offer “Basic Life Safety Structural Performance”.

The Tier 2 deficiency-based retrofit requires retrofit of the building such that the deficiencies identified in a Tier 1 screening, or a Tier 2 evaluation are mitigated to achieve compliance with the selected Performance Objective(s).

The scope of the Tier 2 deficiency-based retrofit need not expand beyond that necessary to modify the building to comply with a Tier 1 screening or a Tier 2 evaluation.

If the Tier 2 deficiency-based evaluation demonstrates the adequacy of the structure with respect to all of the ‘Noncompliant’ or ‘Unknown’ statements in the Tier 1 screening, then the building complies with the ASCE 41-17 standard for the corresponding Performance Objective. If the building is retrofitted in accordance with the deficiency-based retrofit procedure, then the retrofitted building complies with the ASCE 41-17 standard for the corresponding Performance Objectives.

TIER 2 PARTIAL RETROFIT OBJECTIVES
A partial retrofit, which can address a portion or portion of the building without evaluating or rehabilitating the complete lateral force resisting system, shall meet all of the following ASCE 41-17 requirements:

1. Does not result in a reduction in the Structural Performance Level or Nonstructural Performance Levels of the existing building for the same Seismic Hazard Level.

2. Does not create a new structural irregularity or make an existing structural irregularity more severe.

3. Does not result in an increase in the seismic forces to any component that is deficient in capacity to resist such forces, and

4. Incorporate structural elements that are connected to the existing structure in compliance with the requirements of ASCE 41-17 standard.

LATERAL LOAD ANALYSIS
Seismic lateral forces are determined for the parking structure, using ASCE 41-17, and acting in conjunction with the garage vertical loads. An evaluation of the effects of the lateral forces on the structure is performed. The analysis computes floor masses for each level to determine mass distribution and inertia properties. Wall member geometry, material and section properties for various member sizes and concrete strengths are used to calculate building stiffness. Once stiffness and mass inertia properties are defined, a static analysis is performed to determine mode shapes and the associated period of vibration to use in the lateral analysis. Lateral loads are calculated according to ASCE 41-17 and applied at 5% of the structure dimension on either side of the center of mass to include the effects of accidental torsion in the garage.

Seismic Evaluation Procedure:

1. Select structural system.

2. Identify lateral force-resisting system.

3. Identify structural irregularities and any framing system limitations.

4. Select lateral force procedure (i.e., static, or dynamic).

5. Calculate the total design base shear and distribute over height of structure.

6. Elastically analyze building, including torsion effects, including P-delta effects, if necessary.

7. Check story drift limitations.

8. Combine earthquake and factored gravity loads effects. Verify design of lateral force-resisting elements for required strength and verify special detailing.

9. Confirm complete load path to resist earthquake forces.

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
6 | M A T E R I A L T E S T I N G

FINITE ELEMENT COMPUTER MODELING
The following pages contain the computer model used to determine the seismic base shear, distribution of seismic forces over the height of garage, member forces and member deformations. This model uses the entire structural framing system, including lateral load resisting elements and gravity elements to determine structural story drift.

STEY-BY-STEP PROCEDURE FOR TIER 2 SEISMIC EVALUATION

1. LOAD PATH
“When Tier 2 evaluation procedures require evaluation of the continuity of structural elements to be tied together to form a complete load path, continuity shall be evaluated.” Based on available construction documents, seismic restoration of the parking structure was performed in 1992. It is appropriate to assume that seismic deficiencies of the parking structure observed at that time were checked and addressed on the basis of seismic detailing requirements of UBC 1991. Severe cracking in moment frame columns was identified at the base of all CIP columns with tapered section at the Pier Level.

This could be associated with seismic forces higher than the design seismic loads used for the design of concrete moment frame columns. Higher seismic forces at Village Level can cause an increase in shear at each moment frame column, which in turn caused an increase in column moments at the base of columns at the Pier Level. Higher shear in columns can also lead to higher inelastic seismic movements which then help in formation of plastic hinges (i.e., cracking) in columns at the point of maximum moment.

All CIP columns at the perimeter with reduced section properties were encased with new concrete cover, with epoxy coated shear and flexural reinforcement to increase the overall design capacity of the columns.

Increased shear stiffness of perimeter columns would reduce lateral drift of the parking structure under higher seismic loads. It is possible that the gain in flexural capacity may only take place at the top of column because of proper embedment of new vertical reinforcement.

Waffle shear walls were added in both directions between Village and Pier Levels to increase the lateral force resisting capacity of the parking structure (See Photo 0.5, 0.6, 0.7). Waffle shear wall along line Z.1 between grid lines 2 and 6 is not continuous between Pier and Foundation Level. Local thickening of diaphragm at shear wall ends between grid lines 2 – 3 and 5 – 6 is being provided at Pier Level for transfer of shear wall forces from waffle shear wall to two new concrete shear walls added along line Z between Pier and Foundation Level. Waffle shear wall system behaves very much like a Truss system with diagonal braces resisting lateral shear forces applied by the diaphragm as tension and compression axial forces of its diagonal braces. Since the waffle shear wall along line Z.1 is supported by overhanging precast double tees and when tees experience any vertical load from truss diagonal braces, they deform vertically. The vertical deformation caused by the movement of tees supporting the truss shear wall system then generates tension and compression forces in top and bottom chords of the truss. Waffle shear walls along line Z.1 (2-6) at the Village level and shear walls along line Z (2-3) and (5-6) at the Pier level have a lateral offset distance between them as 6ft, there is out-ofplane discontinuity of vertical lateral force resisting system between the two lines of shear walls that are close to each other and connected laterally by a rigid diaphragm at the Village and Pier Level. This out-of-plane, discontinuity of vertical lateral force resisting element is not preferred, but is allowed by ASCE 7-05, ASCE 7- 10, and ASCE 7-16 for even newer buildings that are located within seismic design category D, E and F. For a

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
7 | M A T E R I A L T E S T I N G
building with out-of-plan discontinuity, ASCE 7-16 requires special detailing of slab collector elements for transferring forces at the required strength level. ASCE 41-17 has no such procedure available for Tier 2 Evaluation for buildings with local discontinuity in load path.

Commentary of section 5.4.2.3 states: “The adequacy of the elements and connections below the vertical discontinuities shall be evaluated as force-controlled elements. The adequacy of struts and diaphragms to transfer load from discontinuous elements to adjacent elements shall be evaluated”. At Pier Level, diaphragm was thickened locally to increase its shear design capacity and to transfer forces from waffle shear wall along line Z.1 to two shear walls located below Pier Level along line Z that were also added when garage restoration was performed in 1992. To address additional vertical shear demand at precast double tees, due to the use of ASCE 41-17 higher seismic forces, carbon fiber wrapping is required at precast double tee stems at waffle shear wall end bays.

New concrete wall was added in 1992 at the Basement level along line 11 to increase the overall length of existing shear wall at line 11. New gravity columns were added in 1992 near grid Y – in the long direction of the garage at Pier and Basement Levels. It is not clear why the designer decided to use 18-inch square concrete columns between Village and Pier Level and supported the same columns using 6-inch round steel columns between Pier and Foundation Level. New waffle shear wall along line 3 is being supported at its western end by a 6-inch round steel column below Pier level (See Photo 3.11). This in-plane discontinuity in shear wall causes reduction in shear wall stiffness along line 3 at the Basement Level.

New 2 ½ inch thick overlay was added over the entire double tee system at the Village Level (See Photo 3.3) in 1992. It is our understanding that this modification was made to address higher diaphragm loads based on the requirements of UBC 1991. At Village Level, additional slab drag reinforcement was added near the shear wall along line 11. ASCE 41-17 diaphragm forces are significantly higher than the UBC 1991 diaphragm forces.

Chord and drag collector elements shall be evaluated as force-controlled and they both will require retrofit in terms of addition of new chord and diaphragm steel at the Village and Pier Level.

No foundation upgrades were documented in the construction documents of 1992 seismic retrofit. No visible cracking in beams, columns or walls was observed in 2011 and in 2021 that can be associated with foundation settlement or overstress condition of foundation elements. a. Shear strength capacity of diaphragm is verified at all supported levels using provisions of ASCE 41-17 to satisfy that the load path is in compliance and is acceptable. b. Steel column supporting discontinuous wall has the design strength to resist the maximum axial force that can develop in accordance with ASCE 41-17. The connections of discontinuous elements to the supporting member shall be adequate to transmit the forces for which the discontinuous element was required to be designed.

2. WEAK AND SOFT STORY
The vertical force distribution provided by ASCE 41-17 section 7.4.1.3.2 is adequate for regular structures with no stiffness discontinuities. Weak and soft story can significantly affect the vertical distribution of seismic forces and, for this reason Response Spectrum Analysis (i.e., Linear Dynamic Procedure – LDP) is performed, which can account for stiffness irregularities over the height of the structure. Response spectrum parameters

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
8 | M A T E R I A L T E S T I N G
were established using USGS seismic design parameters for the project site. For basic Life Safety structural performance, site specific response spectrum is being generated for an earthquake having 5% Probability of Exceedance in 50 years with a mean return period of 975 years. According to ASCE 41-17, Earthquake Hazard Level associated with this type of earthquake is defined as BSE-2E (i.e., Basic Safety Earthquake Level 2) and is appropriate for building where “Basic Collapse Prevention Structural Performance” is required.

3. GEOMETRY
“An analysis in accordance with the Linear Dynamic Procedure of ASCE 41-17 section 5.2.4 shall be performed.

The adequacy of the lateral force resisting elements shall be evaluated.” Linear Dynamic Analysis is performed to verify capacity of all lateral load resisting elements.

4. VERTICAL DISCONTINUTIES
“The adequacy of elements below vertical discontinuities shall be evaluated to support gravity forces and overturning forces generated by the capacity of the discontinuous elements above. The adequacy of struts and diaphragms to transfer load from discontinuous elements to adjacent elements shall be evaluated.” Steel columns supporting discontinuous shear wall at line 3 at the Basement Level is verified and its connections need to be verified for factored axial tension and compression loads. There is no visible sign of connection movement at the top and bottom. There is no visible cracking in the slab near and around the steel column that is associated with any grade beam movement underneath the steel column because of past earthquake activities in the area since 1992. Since the grade beams are soil supported and have already experienced several earthquakes of moderate intensity, it is appropriate to assume that the grade beams underneath the steel columns can transfer vertical loads to the nearest drilled pier without going into any major distress. A case of a beam on elastic foundation is how Walker has analyzed the performance of the grade beam at line 3. Grade beams that are away from drilled piers are not taking any substantial axial, flexural and shear loads.

Adequacy of precast double tees is verified between grid line Z and Z.1 at the Village and Pier Level. At both locations precast double tees are overstressed in transferring vertical shear load to PT beam along line Z at both levels.

5. MASS
No change is mass is anticipated at Village and Pier Level except a small section of top chord of waffle shear wall along line Z.1 needs to be increased to add additional drag or chord reinforcement at the truss at the Village Level. A small section of CIP topping slab needs to be placed at the Village Level to provide additional diaphragm reinforcement near the shear wall at line Z.1

6. TORSION
Small change in torsional shear is anticipated due to the proposed addition of new shear walls at the Pier and Basement Level to help reduce shear overstress condition at existing shear walls along line 3, X, and Z.

7. DETERIORATION OF CONCRETE

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
9 | M A T E R I A L T E S T I N G
No significant deterioration of concrete was observed at gravity and lateral load resisting elements.

8. POST-TENSION OR PRE-STRESS ANCHORS
No corrosion of anchors/end fittings or spalling of concrete is observed near gravity and lateral load resisting elements at the Village, Pier and Basement level.

9. CONCRETE WALL CRACKS
No significant diagonal cracking in concrete shear walls is observed at Pier and Village level.

10. SHEAR STRESS CHECK
Using ASCE 41-17 section 5.5.3.1.1, we found shear walls as overstressed in shear at the Basement Level at line X (4 – 11), at line Z (2-3) and (5-6), and shear walls along line 3. We have assumed compressive strength of shear walls to be equal to 5000psi to 7000 psi based on Compressive Strength field test values obtained in 2022. To compensate for this condition, (1) new shear wall is recommended for line 3 at the Pier Level only and (2) new shear walls are to be added at both the Pier and Basement Level at line 7.

11. WALL THICKNESS AND PROPORTIONS
Using ASCE 41-17 section 5.5.3.1.1 and 5.5.3.1.2, we found shear walls thickness to be increased at the Basement Level at line X (4 – 11), at line Z (2-3) and (5-6), and shear walls along line 3. We also found that the shear wall thickness at line 11 at the Pier Level should also be increased to resist ASCE 41-17 force demand.

12. REINFORCING STEEL
At the Pier level, shear wall reinforcement ratios for both wall vertical and horizontal reinforcement are greater than the required ratios but shear wall at line 11 is overstressed in shear and requires additional horizontal reinforcement. At the Basement level, shear wall reinforcement ratio for wall vertical reinforcement is in the range of 0.0018 and are acceptable. However, reinforcement ratio for wall horizontal reinforcement at shear walls along line X, Z and line 3 are low. Wall shear stresses are also above the allowable shear stress values at those grid lines. To compensate for this condition, additional new shear walls are recommended for line 3 at the Pier Level and (2) new shear walls at line 7 at both Pier and Basement Level.

13. COUPLING BEAMS AT SHEAR WALLS
At Pier Level, diagonal braces of waffle shear wall along line 3 near line Y and along line X are performing similar to how coupling beams work for segmented shear walls. Those diagonal braces are showing overstressed condition for axial tension and compression. To compensate for this condition, additional new shear walls are recommended for line 3 at the Pier Level near line Z and at line 7 at both Pier and Basement Level. Strengthening of waffle shear wall diagonal braces is also recommended.

14. CONFINEMENT REINFORCEMENT
Infill shear walls along line Z.1 at the Basement Level are confined by existing CIP columns. Majority of shear walls at the Pier and Basement Level are without any special closely spaced confinement reinforcement.

However, there are no signs of any cracking at the existing shear walls. Carbon fiber wrapping would be considered for providing confinement to shear wall ends to satisfy this requirement.

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
10 | M A T E R I A L T E S T I N G

15. TRANSFER OF SHEAR WALLS OR WALL CONNECTIONS
Diaphragm is connected to shear walls at all supported levels. Amount of shear transfer reinforcement provided is appeared to be on the low side at all shear walls. Amount of shear transfer reinforcement is not adequate based on the forces obtained from the Linear Dynamic Procedure. Drag and collector reinforcement at the East-West direction shear walls is not known and may possibly be on the low side of design requirements.

16. FOUNDATION DOWELS
There is no information available on Foundation dowels and further testing is required in future to determine this design item. Shear walls are connected to grade beams at all locations. Destructive testing in 2022 at several shear wall locations have established that existing shear walls have adequate wall vertical reinforcement. There are two shear walls along line 3 at the Basement Level where shear walls have flexural overstress condition. To compensate for this condition, additional new shear walls are recommended for line 3 at the Pier Level and at line 7 at both Pier and Basement Level.

17. DEFLECTION COMPATIBILITY
Based on 3-D computer analysis and verification of member forces, shear capacity of columns is adequate to resist factored flexural, axial and shear loads. There is only one CIP column at grid line 3 and line Z which is showing signs of shear overstress as it is in the direction of drag forces building towards shear wall at grid line 3 and line Y. To compensate for this condition, additional new shear wall is recommended for line 3 at the Pier Level and at line 7 at both Pier and Basement Level.

18. UPLIFT AT PILE CAPS
We didn’t observe any major problem with the gravity system, diaphragms, and slab-on-grade that suggests that current state of pile foundation system is any risk to the Basic Life Safety of the structure. However, our current analysis shows significant amount of lateral shear resisted by 12” round piles at line 3 and at line 11.

Without knowing the amount of reinforcement in those concrete piles it is difficult to establish their demand capacity ratios in terms of flexure and shear loads. To compensate for this condition, additional new concrete piles are recommended for line 7 for new concrete shear walls that are recommended at the Basement Level.

19. LIQUEFACTION
We would recommend that the City hire a registered geo-technical engineer to evaluate current soil conditions near the garage site and to determine risk of having soil liquefaction at the garage site.

20. SLOPE FAILURE AND SURFACE RUPTURE
We would recommend that the city hire a registered geo-technical engineer to evaluate current soil conditions near the garage site and to determine risk of having soil/rock slope failure and surface fault rupture at the garage site.

21. FOUNDATION PERFORMANCE

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
11 | M A T E R I A L T E S T I N G
We would recommend that the City shall consider hiring a registered surveyor to establish garage benchmark elevations to monitor any possible building movement due to any seismic event or due to any soil’s related issue.

22. OVERTURNING
At Basement Level, shear wall along line 3 near line Z is showing overstressed condition in flexure. Remainder of shear walls at Village and Pier Level are adequate in flexure or overturning. To compensate for this condition, additional new shear walls are recommended for line 3 at the Pier Level and at line 7 at both Pier and Basement Level.

23. TIES BETWEEN FOUNDATION ELEMENTS
We didn’t observe any distress at foundation walls or slabs at upper levels that suggests that there is any movement of soil at the foundation level that suggests that current state of pile foundation system is any risk to the Basic Life Safety of the structure. However, our current analysis shows significant amount of lateral shear resisted by 12” round piles at line 3 and at line 11. Without knowing the amount of reinforcement in those concrete piles it is difficult to establish their demand capacity ratios in terms of flexure and shear loads.

To compensate for this condition, additional new concrete piles are recommended for line 7 for new concrete shear walls that are recommended at the Basement Level.

Table D1 - Opinion of Probable Costs for Conceptual Repair Work Item Description
Estimated
Cost

1.00 General Conditions

1.10 Mobilization & General Conditions $25,000

2.00 Seismic Structural Repairs

2.01 Install (24) new drilled piers $100,000

2.02 Install (5) new concrete shear walls at Pier and Basement Level $500,000

2.03 Addition of carbon fiber wrapping at Line 3 and X at waffle shear wall at Pier Level $30,000

2.04 Addition of shear wall drag reinforcement at Village Level at line Z.1 $25,000

2.05 Addition of carbon fiber wrap at precast double tee stems (Village & Pier Level) near line Z $30,000

2.06 Addition of carbon fiber wrap at CIP Shear walls ends for confinement at line 11 at the Pier Level, at Line Z at CIP columns at lines 2, 3, 5, and 6 at Pier Level $25,000

2.07 Thickening of CIP shear wall at line Z (2-3) at Basement Level $25,000

2.08 Thickening of CIP shear wall at line Z (5-6) at Basement Level $25,000

2.09 Thickening of CIP shear walls at line 3 at Basement Level $35,000

2.10 Thickening of CIP shear wall at line X (4-11) at Basement Level $170,000

2.11 Thickening of CIP shear wall at line 11 (at grid Y) at Pier Level $35,000

2.12 Addition of slab reinforcement at Shear walls (East-West direction) at Village and Pier Level (i.e., chord/drag reinforcement, and shear transfer reinforcement) $200,000

2.13 Addition of slab reinforcement at Shear walls (North-South direction) at Village and Pier Level (i.e., chord/drag reinforcement, and shear transfer reinforcement) $200,000

2.14 Strengthen CIP column at Grid line 3 and Z at Pier Level $25,000

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
12 | M A T E R I A L T E S T I N G
Repair Subtotal $1,450,000
Recommended Contingency (10%) $145,000
Engineering Services $160,000
Geotechnical Recommendations on Soil
condition at the project site $50,000
Building Survey Elevations $15000
Project Total $1,820,000
APPENDIX B – TIER 1 SCREENING CHECKLIST
Table 1. Tier 1 Screening – Collapse Prevention Basic Configuration Checklist (Reproduced herein ASCE 41-17, Table 17-2)

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
13 | M A T E R I A L T E S T I N G

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
14 | M A T E R I A L T E S T I N G
Table 2. Tier 1 Screening–Collapse Prevention Structural Checklist for Building Types C2 and C2a (Reproduced herein ASCE 41-17, Table 17-24)

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
15 | M A T E R I A L T E S T I N G

PROJECT PHOTOS

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
16 | M A T E R I A L T E S T I N G
Photo 3.1- Construction of North Pier Parking Structure in 1962 Photo 3.2- Construction of North Pier Parking Structure - 1962

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
17 | M A T E R I A L T E S T I N G
Photo 3.3- 2 ½-inch-thick overlay of CIP topping slab – Village Level Photo 3.4- 24-inch-thick shear wall at line 3 and Y at Basement Level

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
18 | M A T E R I A L T E S T I N G
Photo 3.5- 12-inch-thick waffle shear wall at line 3 and Y at Pier Level Photo 3.6- 12-inch-thick waffle shear wall along line X at Pier Level

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
19 | M A T E R I A L T E S T I N G
Photo 3.7- 12-inch-thick waffle shear wall at line Z.1 at Pier Level Photo 3.8- 10-inch-thick shear wall at line 11 and Y at the Pier Level

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
20 | M A T E R I A L T E S T I N G
Photo 3.9- CIP columns at line 3 and Z at the Pier Level Photo 3.10—CIP Columns at Line X.7 and Y.3 at the Pier Level

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
21 | M A T E R I A L T E S T I N G
Photo 3.11—6-inch round steel columns at line X.7 and Y.3 at the Basement Level Photo 3.12- 8-inch-thick CIP Retaining Wall at line X and X.1 at Basement Level

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
22 | M A T E R I A L T E S T I N G
Photo 3.13- Shear wall along line 11 at Basement Level
Photo 3.14- Truss chords at waffle shear wall at line Z.1 at the Village and Pier Level

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
23 | M A T E R I A L T E S T I N G
Photo 3.15- Precast double tee stems at waffle shear wall ends at line Z.1 at the Village and Pier Level Photo 3.16- CIP Columns at shear wall ends at line Z at the Pier and Basement Level

PARKING CONDITION ASSESMENT
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 July 06,2022
24 | M A T E R I A L T E S T I N G

PARKING STRUCTURE AREAS WITH PROPOSED SEISIMIC RESTORATION PER ASCE 41-17 RECOMMENDATIO

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
25 | M A T E R I A L T E S T I N G
Work Item Legend
Item
No.

Work Item Description

1.00 General Conditions

1.10 Mobilization & General Conditions

2.00 Seismic Structural Repairs

2.01 Install (24) new drilled piers

2.02 Install (5) new concrete shear walls at Pier and Basement Level

2.03 Addition of carbon fiber wrapping at Line 3 and X at waffle shear wall at Pier Level

2.04 Addition of shear wall drag reinforcement at Village Level at line Z.1

2.05 Addition of carbon fiber wrap at precast double tee stems (Village & Pier Level) near line Z

2.06 Addition of carbon fiber wrap at CIP Shear walls ends for confinement at line 11 at the Pier Level, at Line Z at CIP columns at lines 2, 3, 5, and 6 at Pier Level

2.07 Thickening of CIP shear wall at line Z (2-3) at Basement Level

2.08 Thickening of CIP shear wall at line Z (5-6) at Basement Level

2.09 Thickening of CIP shear walls at line 3 at Basement Level

2.10 Thickening of CIP shear wall at line X (4-11) at Basement Level

2.11 Thickening of CIP shear wall at line 11 (at grid Y) at Pier Level

2.12 Addition of slab reinforcement at Shear walls (East-West direction) at Village and Pier Level (i.e., chord/drag reinforcement, and shear transfer reinforcement)

2.13 Addition of slab reinforcement at Shear walls (North-South direction) at Village and Pier Level (i.e., chord/drag reinforcement, and shear transfer reinforcement)

2.14 Strengthen CIP column at Grid line 3 and Z at Pier Level

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
26 | M A T E R I A L T E S T I N G
Figure 3.1-Sesimic Structural Work Item Locations– Basement Level

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
27 | M A T E R I A L T E S T I N G
Figure 3.2-Sesimic Structural Work Item Locations–Pier Level

PARKING CONDITION ASSESMENT-UPDATE
North Pier Parking Structure | Redondo Beach, CA

WC PROJECT No. 37-009397.00 June 6, 2022
28 | M A T E R I A L T E S T I N G
Figure 3.3-Sesimic Structural Work Item Locations– Village Level WALKER CONSULTANTS | 29
3-D Finite Element Analysis Model
8" CIP Shear wall
at line X - Basement
Level
8" CIP Shear wall
at line X.1 - Basement
Level
Waffle Shear wall
at line X - Pier Level
Waffle Shear wall
at line Z.1 - Pier Level Waffle Shear wall
at line 3 - Pier Level
24" CIP Shear wall
at line 3 -
Basement Level
10" CIP Shear wall
at line Z - Basement
Level
10" CIP Shear wall
at line 11 - Pier &
Basement Level page 1 of 36
Plan Layout of Shear walls page 2 of 36
Deformed Shape due ASCE 41-17 BSE-2E forces
(East-West Direction Movement)
page 3 of 36
Deformed Shape due ASCE 41-17 BSE-2E forces
(North-South Direction Movement)
page 4 of 36
Walker Parking
Consultants, Inc.
150 Executive Park Boulevard,
Suite 3750, San Francisco
CA 94134
Tel (415) 330-1895
Fax (415) 330-1898
CLIENT City of Redondo Beach SECTION ASCE 41-17
PROJECT North Pier SHEET 1 OF 2
JOB No 37-009397.00 DRAWING NO
CALCULATION BY Sohban S. Khan DATE 02-10-2022
CHECKED BY Sohban S. Khan DATE
APPROVED BY Units Kips-inches
OBJECT Seismic parameters per ASCE 41-17
Given Data:

Determine DCR for each action item like, axial, moment and shear applied on a primary component. If component DCR exceeds the lesser of 3.0 and the m-factor for the component action and structure has any irregularity then Linear Static Procedure for analysis is not applicable.

Assume, DCRmax := 3.0 using initial values of C1, C2, Cm equal 1.0 No. of stories, Ns
:= 2
Concrete or Masonry shear wall building, Cm := 1.0 See Table 7-4 Site Class, D Site class factor, a 60 := for Site Class D, E, and F Fundamental period of the building, T1x := 0.2 T1y := 0.29 Ratio of required elastic strength to the yield strength, μstrength max
DCRmax

1.5 Cm, 1.0






:= from Appendix C7.4.1.3 - Eq: C7-3
μstrength = 2
C1x 1
μstrength - 1
a T1x
2 
+:= C1x = 1.417 C1y 1
μstrength - 1
a T1y
2 
+:= C1y = 1.198
C2x 1
1 800
μstrength - 1
T1x






2 +:= C2x = 1.031 C2y 1
1 800
μstrength - 1
T1y






2 +:= C2y = 1.015
C1x C2x  = 1.461 C1y C2y  = 1.216
2/10/2022 1
page 5 of 36
Walker Parking
Consultants, Inc.
150 Executive Park Boulevard,
Suite 3750, San Francisco
CA 94134
Tel (415) 330-1895
Fax (415) 330-1898
For Concrete Shear walls, m-factors are defined in Chapter 10 for different wall conditions mmax := 4 (Assume but will verify later)
Per Table 7-3 Maximum value of C1C2
= 1.4 for mmax = 4
2/10/2022 2
page 6 of 36
Selection of BPOE
BSE-2E Sxs = 1.413
BSE-1E Sxs = 0.81
BSE-2E/BSE-1E = 1.744
If ratio of Collapse Prevention m-factor to Life Safety m-factor is less than 1.744, Collapse Prevention in the BSE-2E will be more severe performance objective.

Shear walls controlled by Shear w/ axial load
mLS = 2
mCP = 3
mCP/mLS = 1.5
Non-conforming Shear walls in flexure, low axial & shear mLS = 2.5
mCP = 4
mCP/mLS = 1.6
Collapse Prevention @ BSE-2E will govern the Evaluation page 7 of 36
Project Title: North Pier Parking Structure
Project Engineer: Sohban S. Khan, P.E.

Engineer of Record:

Date:

Seismic Dead Weight = 9661 kips (prior to 1991 repairs) Seismic Dead Weight = 10728 kips (after 1991 repairs)
Year Acc. %W Ve % diff
1961 0.1333 1287.81 Service Level 1.0
1991 0.1833 1966.44 Service Level 1.53
2005 0.269 2885.83 Factored Level 1.13
2010 0.218 2338.70 Factored Level 0.81
2016 0.253 2714.18 Factored Level 1.16
Year Acc. %W Vxe % diff
2012 1.547 16596.22 ASCE 31-03 1.0
2013 1.743 18698.90 ASCE 41-13 1.13
2017 2.059 22088.95 ASCE 41-17 1.18
Year Acc. %W Vxe % diff
2012 1.308 14032.22 ASCE 31-03 1.0
2013 1.474 15813.07 ASCE 41-13 1.13
2017 1.741 18677.45 ASCE 41-17 1.18
Year Acc. %W Vxe % diff
2012 0.887 9515.74 ASCE 31-03 1.0
2013 1.096 11757.89 ASCE 41-13 1.24
2017 1.18 12659.04 ASCE 41-17 1.08
Year Acc. %W Vxe % diff
2012 0.75 8046.00 ASCE 31-03 1.0
2013 0.9266 9940.56 ASCE 41-13 1.24
2017 0.9979 10705.47 ASCE 41-17 1.08
ASCE 31/41 Pseudo Lateral forces (BSE-1E) - Tier 2
Y-Direction Psuedo Lateral Forces
UBC/ASCE 7 seismic code forces
2/11/2022
ASCE 31/41 Pseudo Lateral forces (BSE-2E) - Tier 2
ASCE 31/41 Pseudo Lateral forces (BSE-1E) - Tier 2
X-Direction Psuedo Lateral Forces
X-Direction Psuedo Lateral Forces
ASCE 31/41 Pseudo Lateral forces (BSE-2E) - Tier 2
Y-Direction Psuedo Lateral Forces
Historical Seismic Force Comparison
page 8 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
CLIENT City of Redondo Beach SECTION ASCE 31-03
PROJECT North Pier SHEET 1 OF 6
JOB No 37-009397.00 DRAWING NO
CALCULATION BY Sohban S. Khan DATE 12-15-2021
CHECKED BY Sohban S. Khan DATE
APPROVED BY Units Kips-inches
OBJECT ASCE 31-03 Seismic Force Distribution for Tier 1 Analysis Given Data:

Project zip code = 90277 Latitude = 33.839 North, Longitude = -118.389 West Ref: Table 1613.5.2
Site Class, D Stiff soil
N = 15 to 509, su= 1000 to 2000 psf, vs = 600 to 1200 ft/sec Seismci Hazard Level = BSE-2N - (i.e., seismic hazard with a 2% probability of exceedence in 50 years)
Mapped spectral accelerations for short periods Ss 1.466 g:= per SEAOC Maps Mapped spectral accelerations for a 1-sec. period S1

0.624 g:= per SEAOC Maps
Site coefficient Fa as function of Ss and Site Class, Fa 1.0 := per Table 2-3 Site coefficient Fv as function of S1 and Site Class, Fv 1.5 := per Table 2-3 Design Spectral Response Acceleration Parameters:

Sxs Fa Ss := Sxs 1.466 g= Ref: Eq (2-1) These are the spectral design values for BSE-2N
Sx1 Fv S1:= Sx1 0.936 g= Ref: Eq (2-2)
Seismic Use Group, II "Parking Structure falls under Risk Category II" Ts
Sx1
Sxs
:= Ts= 0.638
T00.2 Ts:= T0= 0.128
β := 0.05 B1
4 ( ) 5.6 ln 100 - ( ) β
:= B1= 1.002
TL:= 8
12/15/2021 1
page 9 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
i 0 0.01 , TL..:= T1i( ) i :=
Response Spectrum
Sai( ) Sxs
5 B1
- 2






T1i( )
Ts
 + 0.4






 T1i( ) T0if 
Sxs
B1
T0T1< i( ) Tsif <
Sx1
B1T1 i( ) ( ) Ts
T1< i( ) TLif <
TLSx1 
B1T1i( )2





T1i( ) TLif >
:=
0 0.5 1 1.5 2
0 0.5
1 1.5
2 Response Spectrum
Period, T
Spectral Response Acceleration, Sa
Sai( )
g
T1i( )
12/15/2021 2
page 10 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
SDS_1N 0.67 Sxs := SDS_1N 0.982 g=
These are the spectral design values for BSE-1N
SD1_1N 0.67 Sx1 := SD1_1N 0.627 g=
SDS_2E 0.7437 Sxs := SDS_2E 1.09 g=
These are the spectral design values for BSE-2E
SD1_2E 0.758 Sx1 := SD1_2E 0.709 g=
SDS_1E 0.4263 Sxs := SDS_1E 0.625 g=
These are the spectral design values for BSE-1E
SD1_1E 0.385 Sx1 := SD1_1E 0.36 g=
Building Structure is assigned level of Seismicity as 'High' Number of supported levels N := 2 Seismic shear is distributed to 2 levels above Ground Level
Building story heights h 13 11 0 0 0 0 0 0 0 0 0 0 0 0 0 := ( ) Heights from E.T.F to
Mid-Ridge Height Total Height of the building hn
1 N
i
h
  i 1-

=
:= hn = 24
Building fundamental Time Period
in two orthogonal directions
Ct:= 0.02 x 0.75 := Ta Ct( ) hn x:= Ta 0.217 =
T'a 0.1N := T'a 0.200 =
Cu:= 1.4 Txcalc := 0.13 Tycalc := 0.29
Tmax Cu:= Ta Tmax = 0.304
Area of typical floor in square foot Af 33750 :=
Structural dead load at 2nd level in pounds per square foot w1 145 := A1 31968 := Structural dead load at typical supported level in pounds per square foot w_typ 145 := Structural dead load at roof level in pounds per square foot wr 205 := Ar 33750 := Seismic dead load in kips W
[ ] w1 A1  + w_typ N 2 ( ) - Af wr Ar +
1000
:= W 11554.11 =
Calculation for Design Base Shear in X and Y direction (using ASCE 31-03) - Tier 1 C := 1.2 Sa_tier1 min
Sxs
g
Sx1
Ta g
,






:= Sa_tier1 = 1.466
C Sa_tier1  = 1.759
12/15/2021 3
page 11 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
V C Sa_tier1 :=  W
V 20325.99 = kips - Pseudo Seismic Force For Linear Static Procedure at BSE-2N level V2E 0.7437 V:= V2E = 15116.44 kips - Pseudo Seismic Force For Linear Static Procedure at BSE-2E level
V1E 0.4263 V:= V1E = 8664.97 kips - Pseudo Seismic Force For Linear Static Procedure at BSE-1E level
Vertical Distribution of Seismic Lateral Forces i 1 N..:= w' i( ) w1
A1
1000
 if i 1 =
w_typ
Af
1000
 otherwise
:= h i( ) h
  i 1-
if i 1 =
h
  i 1-
otherwise
:=
w i( ) wr
Ar
1000
 if i N=
w' i( ) otherwise
:= h' i( )
1 i
j
 h j( )
=
:=
i N N 1 -..:=
k
x
1 Txcalc if  0.5
1 0.5 Txcalc + ( ) - 0.5 otherwise
:=
k
x
= 1
k
y
1 Tycalc if  0.5
1 0.5 Tycalc + ( ) - 0.5 otherwise
:=
k
y
= 1
Cvx i( )
w i( ) h' i( )
k
x

1 N
i
w i( ) h' i( )
k
x




 
=












:= Cvy i( )
w i( ) h' i( )
k
y

1 N
i
w i( ) h' i( )
k
y




 
=












:=
i
2 1
= Cvx i( )

0.734

0.266
= Cvy i( )

0.734

0.266
= h' i( )
24 13
=
Fx i( ) Cvx i( ) V1E := Sx x( )
x
N
i
 Fx i( )
=
:=
Fy i( ) Cvy i( ) V1E := Sy x( )
x
N
i
 Fy i( )
=
:=
12/15/2021 4
page 12 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
1 N
i
Cvx  i( )
=
= 1
1 N
i
Cvy  i( )
=
= 1
· Design story forces (Pier and Village level)
Story
Weight
Lateral Story Forces Cumm. Story shears
w i( )
6918.8
4635.4
= Fx i( )
6357.74
2307.23
= Fy i( )
6357.74
2307.23
= Sx i( )
6357.74
8664.97
= Sy i( )
6357.74
8664.97
=
x 1 N..:=
2 103 4 103 6 103 8 103 1 104
0 0.5
1 1.5
2 DISTRIBUTION OF SEISMIC FORCES

LATERAL FORCE & STORY SHEAR

STORY LEVELS
x
x
Fx x( ) , Sx x( )
12/15/2021 5
page 13 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
· Diaphragm Seismic Forces i 1 N..:=
Fpx x( )
x
N
i
 Fx i( )
=
w x( )
x
N
i
 w i( )
=
:= Fpy x( )
x
N
i
 Fy i( )
=
w x( )
x
N
i
 w i( )
=
:=
i N N 1 -..:=
· Design diaphragm seismic forces (Pier and Village level) Fpx i( )
Fx i( )
1 1.507
=
Fx i( )
w i( )

0.919

0.498
=
i
2 1
= w i( )
6918.75
4635.36
= Fpx i( )
6357.74
3476.27
= Fx i( )
6357.74
2307.23
=
Fpx i( )
Fy i( )
1 1.507
=
Fy i( )
w i( )

0.919

0.498
=
i
2 1
= w i( )
6918.75
4635.36
= Fpy i( )
6357.74
3476.27
= Fy i( )
6357.74
2307.23
=
12/15/2021 6
page 14 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
CLIENT City of Redondo Beach SECTION ASCE 41-17
PROJECT North Pier SHEET 1 OF 6
JOB No 37-009397.00 DRAWING NO
CALCULATION BY Sohban S. Khan DATE 12-15-2021
CHECKED BY Sohban S. Khan DATE
APPROVED BY Units Kips-inches
OBJECT ASCE 41-17 Seismic Force Distribution for Tier 1 Analysis Given Data:

Project zip code = 90277 Latitude = 33.839 North, Longitude = -118.389 West Ref: Table 1613.5.2
Site Class, D Stiff soil
N = 15 to 509, su= 1000 to 2000 psf, vs = 600 to 1200 ft/sec Seismci Hazard Level = BSE-2N - (i.e., seismic hazard with a 2% probability of exceedence in 50 years)
Mapped spectral accelerations for short periods Ss 1.9 g:= per SEAOC Maps Mapped spectral accelerations for a 1-sec. period S1

0.686 g:= per SEAOC Maps
Site coefficient Fa as function of Ss and Site Class, Fa 1.0 := per Table 2-3 Site coefficient Fv as function of S1 and Site Class, Fv 1.7 := per Table 2-3 Design Spectral Response Acceleration Parameters:

Sxs Fa Ss := Sxs 1.9 g= Ref: Eq (2-1) These are the spectral design values for BSE-2N
Sx1 Fv S1:= Sx1 1.166 g= Ref: Eq (2-2)
Seismic Use Group, II "Parking Structure falls under Risk Category II" Ts
Sx1
Sxs
:= Ts= 0.614
T00.2 Ts:= T0= 0.123
β := 0.05 B1
4 ( ) 5.6 ln 100 - ( ) β
:= B1= 1.002
TL:= 8
12/15/2021 1
page 15 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
i 0 0.01 , TL..:= T1i( ) i :=
Response Spectrum
Sai( ) Sxs
5 B1
- 2






T1i( )
Ts
 + 0.4






 T1i( ) T0if 
Sxs
B1
T0T1< i( ) Tsif <
Sx1
B1T1 i( ) ( ) Ts
T1< i( ) TLif <
TLSx1 
B1T1i( )2





T1i( ) TLif >
:=
0 0.5 1 1.5 2
0 0.5
1 1.5
2 Response Spectrum
Period, T
Spectral Response Acceleration, Sa
Sai( )
g
T1i( )
12/15/2021 2
page 16 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
SDS_1N 0.67 Sxs := SDS_1N 1.273 g=
These are the spectral design values for BSE-1N
SD1_1N 0.67 Sx1 := SD1_1N 0.781 g=
SDS_2E 0.7437 Sxs := SDS_2E 1.413 g=
These are the spectral design values for BSE-2E
SD1_2E 0.758 Sx1 := SD1_2E 0.884 g=
SDS_1E 0.4263 Sxs := SDS_1E 0.81 g=
These are the spectral design values for BSE-1E
SD1_1E 0.385 Sx1 := SD1_1E 0.449 g=
Building Structure is assigned level of Seismicity as 'High' Number of supported levels N := 2 Seismic shear is distributed to 2 levels above Ground Level
Building story heights h 13 11 0 0 0 0 0 0 0 0 0 0 0 0 0 := ( ) Heights from E.T.F to
Mid-Ridge Height Total Height of the building hn
1 N
i
h
  i 1-

=
:= hn = 24
Building fundamental Time Period
in two orthogonal directions
Ct:= 0.02 x 0.75 := Ta Ct( ) hn x:= Ta 0.217 =
T'a 0.1N := T'a 0.200 =
Cu:= 1.4 Txcalc := 0.13 Tycalc := 0.29
Tmax Cu:= Ta Tmax = 0.304
Area of typical floor in square foot Af 33750 :=
Structural dead load at 2nd level in pounds per square foot w1 145 := A1 31968 := Structural dead load at typical supported level in pounds per square foot w_typ 145 := Structural dead load at roof level in pounds per square foot wr 205 := Ar 33750 := Seismic dead load in kips W
[ ] w1 A1  + w_typ N 2 ( ) - Af wr Ar +
1000
:= W 11554.11 =
Calculation for Design Base Shear in X and Y direction (using ASCE 41-17) - Tier 1 C := 1.2 Sa_tier1 min
Sxs
g
Sx1
Ta g
,






:= Sa_tier1 = 1.9
C Sa_tier1  = 2.28
12/15/2021 3
page 17 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
V C Sa_tier1 :=  W
V 26343.37 = kips - Pseudo Seismic Force For Linear Static Procedure at BSE-2N level V2E 0.7437 V:= V2E = 19591.56 kips - Pseudo Seismic Force For Linear Static Procedure at BSE-2E level
V1E 0.4263 V:= V1E = 11230.18 kips - Pseudo Seismic Force For Linear Static Procedure at BSE-1E level
Vertical Distribution of Seismic Lateral Forces i 1 N..:= w' i( ) w1
A1
1000
 if i 1 =
w_typ
Af
1000
 otherwise
:= h i( ) h
  i 1-
if i 1 =
h
  i 1-
otherwise
:=
w i( ) wr
Ar
1000
 if i N=
w' i( ) otherwise
:= h' i( )
1 i
j
 h j( )
=
:=
i N N 1 -..:=
k
x
1 Txcalc if  0.5
1 0.5 Txcalc + ( ) - 0.5 otherwise
:=
k
x
= 1
k
y
1 Tycalc if  0.5
1 0.5 Tycalc + ( ) - 0.5 otherwise
:=
k
y
= 1
Cvx i( )
w i( ) h' i( )
k
x

1 N
i
w i( ) h' i( )
k
x




 
=












:= Cvy i( )
w i( ) h' i( )
k
y

1 N
i
w i( ) h' i( )
k
y




 
=












:=
i
2 1
= Cvx i( )

0.734

0.266
= Cvy i( )

0.734

0.266
= h' i( )
24 13
=
Fx i( ) Cvx i( ) V1E := Sx x( )
x
N
i
 Fx i( )
=
:=
Fy i( ) Cvy i( ) V1E := Sy x( )
x
N
i
 Fy i( )
=
:=
12/15/2021 4
page 18 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
1 N
i
Cvx  i( )
=
= 1
1 N
i
Cvy  i( )
=
= 1
· Design story forces (Pier and Village level)
Story
Weight
Lateral Story Forces Cumm. Story shears
w i( )
6918.8
4635.4
= Fx i( )
8239.91
2990.27
= Fy i( )
8239.91
2990.27
= Sx i( )
8239.91
11230.18
= Sy i( )
8239.91
11230.18
=
x 1 N..:=
5 103 1 104 1.5 104
0 0.5
1 1.5
2 DISTRIBUTION OF SEISMIC FORCES

LATERAL FORCE & STORY SHEAR

STORY LEVELS
x
x
Fx x( ) , Sx x( )
12/15/2021 5
page 19 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
· Diaphragm Seismic Forces i 1 N..:=
Fpx x( )
x
N
i
 Fx i( )
=
w x( )
x
N
i
 w i( )
=
:= Fpy x( )
x
N
i
 Fy i( )
=
w x( )
x
N
i
 w i( )
=
:=
i N N 1 -..:=
· Design diaphragm seismic forces (Pier and Village level) Fpx i( )
Fx i( )
1 1.507
=
Fx i( )
w i( )

1.191

0.645
=
i
2 1
= w i( )
6918.75
4635.36
= Fpx i( )
8239.91
4505.4
= Fx i( )
8239.91
2990.27
=
Fpx i( )
Fy i( )
1 1.507
=
Fy i( )
w i( )

1.191

0.645
=
i
2 1
= w i( )
6918.75
4635.36
= Fpy i( )
8239.91
4505.4
= Fy i( )
8239.91
2990.27
=
12/15/2021 6
page 20 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
CLIENT City of Redondo Beach SECTION ASCE 41-17
PROJECT North Pier SHEET 1 OF 7
JOB No 37-009397.00 DRAWING NO
CALCULATION BY Sohban S. Khan DATE 02-10-2022
CHECKED BY Sohban S. Khan DATE
APPROVED BY Units Kips-inches
OBJECT ASCE 41-17 Seismic Force Distribution for Tier 2 Analysis Given Data:

Project zip code = 90278 Latitude = 33.839 North, Longitude = -118.389 West Ref: Table 1613.5.2
Site Class, D Stiff soil
N = 15 to 509, su= 1000 to 2000 psf, vs = 600 to 1200 ft/sec Seismci Hazard Level = BSE-2N - (i.e., seismic hazard with a 2% probability of exceedence in 50 years)
Mapped spectral accelerations for short periods Ss 1.9 g:= per SEAOC Maps Mapped spectral accelerations for a 1-sec. period S1

0.688 g:= per SEAOC Maps
Site coefficient Fa as function of Ss and Site Class, Fa 1.0 := per Table 2-3 Site coefficient Fv as function of S1 and Site Class, Fv 1.7 := per Table 2-3 Design Spectral Response Acceleration Parameters:

Sxs Fa Ss := Sxs 1.9 g= Ref: Eq (2-1) These are the spectral design values for BSE-2N
Sx1 Fv S1:= Sx1 1.17 g= Ref: Eq (2-2)
Seismic Use Group, II "Parking Structure falls under Risk Category II" Ts
Sx1
Sxs
:= Ts= 0.616
T00.2 Ts:= T0= 0.123
β := 0.05 B1
4 ( ) 5.6 ln 100 - ( ) β
:= B1= 1.002
TL:= 8
2/10/2022 1
page 21 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
i 0 0.01 , TL..:= T1i( ) i :=
Response Spectrum
Sai( ) Sxs
5 B1
- 2






T1i( )
Ts
 + 0.4






 T1i( ) T0if 
Sxs
B1
T0T1< i( ) Tsif <
Sx1
B1T1 i( ) ( ) Ts
T1< i( ) TLif <
TLSx1 
B1T1i( )2





T1i( ) TLif >
:=
0 0.5 1 1.5 2
0 0.5
1 1.5
2 Response Spectrum
Period, T
Spectral Response Acceleration, Sa
Sai( )
g
T1i( )
2/10/2022 2
page 22 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
SDS_1N 0.67 Sxs := SDS_1N 1.273 g=
These are the spectral design values for BSE-1N
SD1_1N 0.67 Sx1 := SD1_1N 0.784 g=
SDS_2E 0.7437 Sxs := SDS_2E 1.413 g=
These are the spectral design values for BSE-2E
SD1_2E 0.758 Sx1 := SD1_2E 0.887 g=
SDS_1E 0.4263 Sxs := SDS_1E 0.81 g=
These are the spectral design values for BSE-1E
SD1_1E 0.385 Sx1 := SD1_1E 0.45 g=
Building Structure is assigned level of Seismicity as 'High' Number of supported levels N := 2 Seismic shear is distributed to 2 levels above Ground Level
Building story heights h 13 11 0 0 0 0 0 0 0 0 0 0 0 0 0 := ( ) Heights from E.T.F to
Mid-Ridge Height Total Height of the building hn
1 N
i
h
  i 1-

=
:= hn = 24
Building fundamental Time Period
in two orthogonal directions
Ct:= 0.02 x 0.75 := Ta Ct( ) hn x:= Ta 0.217 =
T'a 0.1N := T'a 0.200 =
Cu:= 1.4 Txcalc := 0.13 Tycalc := 0.29
Tmax Cu:= Ta Tmax = 0.304
Area of typical floor in square foot Af 33750 :=
Structural dead load at 2nd level in pounds per square foot w1 147 := A1 31968 := Structural dead load at typical supported level in pounds per square foot w_typ 147 := Structural dead load at roof level in pounds per square foot wr 179 := Ar 33750 := Seismic dead load in kips W
[ ] w1 A1  + w_typ N 2 ( ) - Af wr Ar +
1000
:= W 10740.55 =
Calculation for Design Base Shear in X and Y direction (using ASCE 41-17) X-Direction Seismic Lateral Forces
2/10/2022 3
page 23 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
C1x := 1.417 C2x := 1.031 C1x C2x  = 1.461 Cm := 1.0 Sa Sxs
B1g
:= Sa= 1.896
Cm C1x  C2x  Sa = 2.769
VxCm C1x  C2x  Sa:=  W
Vx= 29742.85 kips - Pseudo Seismic Force For Linear Static Procedure at BSE-2N level Vx_2E 0.7437 Vx:= Vx_2E = 22119.76 kips - Pseudo Seismic Force For Linear Static Procedure at BSE-2E level
Vx_1E 0.4263 Vx:= Vx_1E = 12679.38 kips - Pseudo Seismic Force For Linear Static Procedure at BSE-1E level
Y-Direction Seismic Lateral Forces
C1y := 1.198 C2y := 1.015 C1y C2y  = 1.216 Cm C1y  C2y  Sa = 2.305 VyCm C1y  C2y  Sa:=  W
Vy= 24755.8 kips - Pseudo Seismic Force For Linear Static Procedure at BSE-2N Vy_2E 0.7437 Vy:= Vy_2E = 18410.89 kips - Pseudo Seismic Force For Linear Static Procedure at BSE-2E level
Vy_1E 0.4263 Vy:= Vy_1E = 10553.4 kips - Pseudo Seismic Force For Linear Static Procedure at BSE-1E level
Vertical Distribution of Seismic Lateral Forces i 1 N..:= w' i( ) w1 A1
1000
 if i 1 =
w_typ
Af
1000
 otherwise
:= h i( ) h
  i 1-
if i 1 =
h
  i 1-
otherwise
:=
w i( ) wr Ar
1000
 if i N=
w' i( ) otherwise
:= h' i( )
1 i
j
 h j( )
=
:=
i N N 1 -..:=
k
x
1 Txcalc if  0.5
1 0.5 Txcalc + ( ) - 0.5 otherwise
:=
k
x
= 1
2/10/2022 4
page 24 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
k
y
1 Tycalc if  0.5
1 0.5 Tycalc + ( ) - 0.5 otherwise
:=
k
y
= 1
Cvx i( )
w i( ) h' i( )
k
x

1 N
i
w i( ) h' i( )
k
x




 
=












:= Cvy i( )
w i( ) h' i( )
k
y

1 N
i
w i( ) h' i( )
k
y




 
=












:=
i
2 1
= Cvx i( )

0.704

0.296
= Cvy i( )

0.704

0.296
= h' i( )
24 13
=
Fx i( ) Cvx i( ) Vx_2E := Sx x( )
x
N
i
 Fx i( )
=
:=
Fy i( ) Cvy i( ) Vy_2E := Sy x( )
x
N
i
 Fy i( )
=
:=
1 N
i
Cvx  i( )
=
= 1
1 N
i
Cvy  i( )
=
= 1
· Design story forces (Pier and Village level)
Story
Weight
Lateral Story Forces Cumm. Story shears
w i( )
6041.3
4699.3
= Fx i( )
15562.55
6557.21
= Fy i( )
12953.14
5457.74
= Sx i( )
15562.55
22119.76
= Sy i( )
12953.14
18410.89
=
2/10/2022 5
page 25 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
x 1 N..:=
1 104 2 104 3 104
0 0.5
1 1.5
2 DISTRIBUTION OF SEISMIC FORCES

LATERAL FORCE & STORY SHEAR

STORY LEVELS
x
x
Fx x( ) , Sx x( )
· Diaphragm Seismic Forces i 1 N..:=
2/10/2022 6
page 26 of 36
Walker Parking
Consultants, Inc.
2525 Bay Area Boulevard, Suite
400, Houston
TX 77058
Tel (281) 280-0068
Fax (281) 280-0373
Fpx x( ) x
N
i
 Fx i( )
=
w x( )
x
N
i
 w i( )
=
:= Fpy x( ) x
N
i
 Fy i( )
=
w x( )
x
N
i
 w i( )
=
:=
i N N 1 -..:=
· Design diaphragm seismic forces (Pier and Village level) Fpx i( )
Fx i( )
1 1.476
=
Fx i( )
w i( )

2.576

1.395
=
i
2 1
= w i( )
6041.25
4699.3
= Fpx i( )
15562.55
9678.03
= Fx i( )
15562.55
6557.21
=
Fpx i( )
Fy i( )

1.201

1.773
=
Fy i( )
w i( )

2.144

1.161
=
i
2 1
= w i( )
6041.25
4699.3
= Fpy i( )
12953.14
8055.29
= Fy i( )
12953.14
5457.74
=
2/10/2022 7
page 27 of 36
Project Title: North Pier Parking Structure
Project Engineer: Sohban S. Khan, P.E.Engineer of Record: Date:

Shear wall Flexural and Shear Capacity Check
Wall ID Wall thick Wall Length Wall f'c Steel fy knowledge Code Pseudo Wall Axial Wall Shear Wall Moment (in.) (ft.) psi ksi LS CP LS CP k-factor Model Force Level PG (kips) VUD (kips) MUD (kips) Pier Level at Line 11/Y 10 37.5 5500 60 2 2.5 2.5 3 1.00 ASCE 41-17 BSE-2E 295 4876 62420Basement Level at Line 11/Y 15.5 78 5500 50 2 2.5 2.5 3 1.00 ASCE 41-17 BSE-2E 555 7720 60306Basement Level at Line 11/X 10 9 7000 50 2 2.5 2.5 3 1.00 ASCE 41-17 BSE-2E 183 384 2991Basement Level at Line 3/Y 24 13 6600 50 2 2.5 2.5 3 1.00 ASCE 41-17 BSE-2E 771 2350 34374Basement Level at Line 3/Z 24 21 5200 50 2 2.5 2.5 3 1.00 ASCE 41-17 BSE-2E 173 8161 80010Basement Level at Line Z/(2-3) 10 29 5500 50 2 2.5 2.5 3 1.00 ASCE 41-17 BSE-2E 110 3769 30870Basement Level at Line Z/(5-6) 10 29 5500 50 2 2.5 2.5 3 1.00 ASCE 41-17 BSE-2E 112.5 4144 33475Basement Level at Line X2/(1-3) 8 82 5500 50 2 2.5 2.5 3 1.00 ASCE 41-17 BSE-2E 582 2272 27104Basement Level at Line X2/(4-11) 8 189 5500 50 2 2.5 2.5 3 1.00 ASCE 41-17 BSE-2E 582 13610 113424 Wall ID Wall thick Wall Length PG/(tw lw f`c) VUD/(tw lw √ f`c) VDE/(tw lw √ f`c) Wall Moment Wall Shear DCR DCR Wall Shear (in.) (ft.) MCE (kips) VCE (kips) Flexure Shear Design, VDE Pier Level at Line 11/Y 10 37.5 0.01 14.61 6.97 Yes 25578 1558.46 2.440 3.13 2325.27Basement Level at Line 11/Y 15.5 78 0.01 7.18 7.88 No 101703 5271.10 0.593 1.46 8475.25Basement Level at Line 11/X 10 9 0.02 4.25 2.50 No 2716 299.52 1.101 1.28 226.33Basement Level at Line 3/Y 24 13 0.03 7.73 4.06 No 14801 776.81 2.322 3.03 1233.42Basement Level at Line 3/Z 24 21 0.01 18.71 3.98 No 20830 1144.41 3.841 7.13 1735.83Basement Level at Line Z/(2-3) 10 29 0.01 14.60 5.42 No 16798 1038.17 1.838 3.63 1399.83Basement Level at Line Z/(5-6) 10 29 0.01 16.06 5.59 No 17312 1038.17 1.934 3.99 1442.67Basement Level at Line X2/(1-3) 8 82 0.01 3.89 17.65 No 123667 2348.41 0.219 0.97 10305.58Basement Level at Line X2/(4-11) 8 189 0.01 10.11 11.30 No 182400 5412.79 0.622 2.51 15200.00 Wall is OK in FlexureWall is OK in FlexureWall is OK in FlexureWall is OK in Flexure Performance Acceptance Status
Shear
Wall is Overstressed in Shear
Wall is OK in ShearWall is OK in Shear
Wall is Overstressed in ShearWall is Overstressed in ShearWall is Overstressed in ShearWall is Overstressed in Shear Wall is OK in ShearWall is OK in Shear
Wall is OK in FlexureWall is OK in FlexureWall is OK in FlexureWall is OK in Flexure Wall is Overstressed in Flexure
2/14/2022
Wall
Confined
Boundary
Flexure m-factor Shear m-factor
Performance Acceptance Status
Flexure
page 28 of 36
Wall ID Remarks
Pier Level at Line 11/Y Wall is overstressed in Shear for both Life Safety and Collapse PreventionBasement Level at Line 11/Y Wall is OK in Flexure and Shear for both Life Safety and Collapse PreventionBasement Level at Line 11/X Wall is OK in Flexure and Shear for both Life Safety and Collapse PreventionBasement Level at Line 3/Y Wall is overstressed in Shear for both Life Safety and Collapse PreventionBasement Level at Line 3/Z Wall is overstressed in Flexure and Shear for both Life Safety and Collapse PreventionBasement Level at Line Z/(2-3) Wall is overstressed in Shear for both Life Safety and Collapse PreventionBasement Level at Line Z/(5-6) Wall is overstressed in Shear for both Life Safety and Collapse PreventionBasement Level at Line X2/(1-3) Wall is OK in Flexure and Shear for both Life Safety and Collapse PreventionBasement Level at Line X2/(4-11) Wall is overstressed in Shear for both Life Safety and Collapse Prevention page 29 of 36
page 30 of 36
Project Title: North Pier Parking Structure
Project Engineer: Sohban S. Khan, P.E.Engineer of Record: Date:Shear wall Reinforcement Check Wall ID Wall thick Wall Length Wall f`c Wall Jamb Wall Reinf. Wall Reinf. Wall Reinf. Steel fy Reinf Ratio Code Pseudo Wall Axial Wall Shear (in.) (ft.) (psi) Reinf. Vertical Horizonatal Av (in^2/ft) ksi Ratio Limit LS CP Model Force Level PG (kips) VUD (kips) Line X (Basement Level) 8 88 5500 #6 @ 6" OC (center) #5 @ 18" OC (center) 0.207 40 0.0022 0.002 2.5 3 ASCE 41-17 BSE-2E 772 2272Line X (Basement Level) 8 189 5500 #6 @ 6" OC (center) #5 @ 18" OC (center) 0.207 40 0.0022 0.002 2.5 3 ASCE 41-17 BSE-2E 2045 13610Line Z (Basement Level) (2 - 3) 10 28 5500 #4 @ 12" OC (EF) #4 @ 12" OC (EF) 0.400 60 0.0033 0.002 2.5 3 ASCE 41-17 BSE-2E 836 3599Line Z (Basement Level) (5 - 6) 10 28 5500 #4 @ 12" OC (EF) #4 @ 12" OC (EF) 0.400 60 0.0033 0.002 2.5 3 ASCE 41-17 BSE-2E 836 3811Line 3 (Basement Level) at Line Y 24 13 6600 (9) #10 #4 @ 6" OC (EF) #4 @ 18" OC (EF) 0.267 60 0.0009 0.002 2.5 3 ASCE 41-17 BSE-2E 725 2306Line 3 (Basement Level) at Line Y 24 21 5200 (9) #10 #4 @ 6" OC (EF) #4 @ 18" OC (EF) 0.267 60 0.0009 0.002 2.5 3 ASCE 41-17 BSE-2E 725 8161Line 11 (Pier Level) at Line Y 10 37.5 7000 #4 @ 12" OC (EF) #4 @ 12" OC (EF) 0.400 60 0.0033 0.002 2.5 3 ASCE 41-17 BSE-2E 295.5 5227 Wall ID Wall thick Wall Length Wall f`c P/tw lw f`c V/tw lw √f'c Allowable Shear Wall Shear Wall Shear DCR Wall Shear Wall Reinf. (in.) (ft.) (psi) Stress (psi) Stress (psi) VCE (kips) shear Status Status Line X (Basement Level) 8 88 5500 0.02 3.626 148.32 107.58 1980.51 1.15 OK OKLine X (Basement Level) 8 189 5500 0.02 10.114 148.32 300.04 4253.59 3.20 Not Good OKLine Z (Basement Level) (2 - 3) 10 28 5500 0.05 14.443 148.32 428.45 1170.37 3.08 Not Good OKLine Z (Basement Level) (5 - 6) 10 28 5500 0.05 15.294 148.32 453.69 1170.37 3.26 Not Good OKLine 3 (Basement Level) at Line Y 24 13 6600 0.03 7.581 162.48 246.37 816.33 2.82 Not Good Not GoodLine 3 (Basement Level) at Line Y 24 21 5200 0.02 18.712 144.22 539.75 1208.25 6.75 Not Good Not GoodLine 11 (Pier Level) at Line Y 10 37.5 7000 0.01 13.883 167.33 464.62 1652.99 3.16 Not Good OK New wall built in 1992New wall built in 1992
Old wall built in 1962Old wall built in 1962
New wall built in 1992
2/14/2022
Shear m-factor
Old wall built in 1962
Remarks
Old wall built in 1962
page 31 of 36
page 32 of 36
Project Title: North Pier Parking Structure
Project Engineer: Sohban S. Khan, P.E.Engineer of Record: Date:

Waffle Shear wall Axial, Flexural and Shear Check
Wall ID Truss Depth Truss Width Truss Length Wall f'c knowledge Long. Reinf. Tie Reinf. Ties Sp. Steel fy (in.) (in.) (ft) psi LS CP LS CP LS CP k-factor As (in^2) Av (in^2) (in) ksi Shear wall truss at line Z 12 12 2 5000 1 1 3 4 1.2 1.5 1 1.76 0.11 24 60Shear wall truss at line Z 12 12 2 5000 1 1 3 4 1.2 1.5 1 1.76 0.11 24 60 Shear wall truss at line X 12 12 2 5000 1 1 3 4 1.2 1.5 1 1.76 0.11 24 60Shear wall truss at line X 12 12 2 5000 1 1 3 4 1.2 1.5 1 1.76 0.11 24 60 Shear wall truss at line 3 12 12 2 5000 1 1 3 4 1.2 1.5 1 1.76 0.11 24 60Shear wall truss at line 3 12 12 2 5000 1 1 3 4 1.2 1.5 1 1.76 0.11 24 60 Compression Tension Compression Tension
Wall ID Truss Depth Truss Width Truss Length Av Reinf Axial Load Axial Load Puf/Ag f'c As Reinf Truss Shear Truss Moment MUD/(VUD d) V/tw lw √f'c Truss Moment Truss Shear Truss Axial Truss Axial (in.) (in.) (ft) Ratio Puf (kips) Tuf (kips) Ratio VUD (kips) MUD (kips) MCE (kips) VCE (kips) PCE (kips) TCE (kips) Shear wall truss at line Z 12 12 2 0.0004 256.5 255.5 0.356 0.006 3.3 4.5 0.130 0.162 33.26 23.66 369.26 95.04Shear wall truss at line Z 12 12 2 0.0004 239 250 0.332 0.006 3.3 4.5 0.130 0.162 33.26 23.66 369.26 95.04 Shear wall truss at line X 12 12 2 0.0004 428 416 0.594 0.006 3.3 4.5 0.130 0.162 33.26 23.66 369.26 95.04Shear wall truss at line X 12 12 2 0.0004 388 371 0.539 0.006 3.3 4.5 0.130 0.162 33.26 23.66 369.26 95.04 Shear wall truss at line 3 12 12 2 0.0004 974.5 864 1.353 0.006 43 82 0.182 2.111 33.26 23.66 369.26 95.04Shear wall truss at line 3 12 12 2 0.0004 646.5 360 0.898 0.006 25 44 0.168 1.228 33.26 23.66 369.26 95.04 Wall ID Truss Depth Truss Width Truss Length DCR DCR DCR DCR Truss Shear Truss Shear Vp/Vo Performance Acceptance Status Performance Acceptance Status Performance Acceptance Status Performance Acceptance Status (in.) (in.) (ft) axial (comp.) axial (tension) flexure shear VO (kips) Vp (kips) Axial (Compression) Axial (Tension) Flexure Shear Shear wall truss at line Z 12 12 2 0.69 2.69 0.14 0.14 46.87 33.264 0.71 Wall Truss OK in Axial Compression Wall Truss OK in Axial Tension Wall Truss OK in Flexure Wall Truss is OK in ShearShear wall truss at line Z 12 12 2 0.65 2.63 0.14 0.14 46.87 33.264 0.71 Wall Truss OK in Axial Compression Wall Truss OK in Axial Tension Wall Truss OK in Flexure Wall Truss is OK in Shear Shear wall truss at line X 12 12 2 1.16 4.38 0.14 0.14 46.87 33.264 0.71 Wall Truss NG in Axial Compression Wall Truss NG in Axial Tension Wall Truss OK in Flexure Wall Truss is OK in ShearShear wall truss at line X 12 12 2 1.05 3.90 0.14 0.14 46.87 33.264 0.71 Wall Truss NG in Axial Compression Wall Truss NG in Axial Tension Wall Truss OK in Flexure Wall Truss is OK in Shear Shear wall truss at line 3 12 12 2 2.64 9.09 2.47 1.82 46.87 33.264 0.71 Wall Truss NG in Axial Compression Wall Truss NG in Axial Tension Wall Truss OK in Flexure Wall Truss is Overstressed in ShearShear wall truss at line 3 12 12 2 1.75 3.79 1.32 1.06 46.87 33.264 0.71 Wall Truss NG in Axial Compression Wall Truss NG in Axial Tension Wall Truss OK in Flexure Wall Truss is OK in Shear Waffle Shear wall Truss Top & Bottom chord Axial Check Compression Wall ID Truss Depth Truss Width Wall f'c knowledge Long. Reinf. Tie Reinf. Ties Sp. Steel fy Av Reinf Axial Load Puf/Ag f'c As Reinf (in.) (in.) psi LS CP LS CP k-factor As (in^2) Av (in^2) (in) ksi Ratio Puf (kips) Ratio Shear wall truss at line Z 14 10 5000 1 1 5 8 1 6 0.11 24 60 0.0005 188 0.269 0.025Shear wall truss at line Z 12 12 5000 1 1 5 8 1 4.74 0.2 30 60 0.0006 160 0.222 0.013 Tension Compression Tension
Wall ID Truss Depth Truss Width Wall f'c Axial Load Truss Shear Chord Axial Chord Axial Chord Shear DCR DCR DCR Performance Acceptance Status Performance Acceptance Status Performance Acceptance Status (in.) (in.) psi Tuf (kips) VUD (kips) PCE (kips) TCE (kips) VCE (kips) Axial (comp.) Axial (tension) shear Axial Compression Axial Tension Shear Shear wall truss at line Z 14 10 5000 501 16.6 483.34 324 23.65 0.39 1.55 0.70 Truss Chord is OK in Axial Compression Truss Chord is NG in Axial Tension Truss Chord is OK in ShearShear wall truss at line Z 12 12 5000 132 13.7 455.65 255.96 25.16 0.35 0.52 0.54 Truss Chord is OK in Axial Compression Truss Chord is OK in Axial Tension Truss Chord is OK in Shear Axial m-factor
2/14/2022
Axial m-factor Flexure m-factor Shear m-factor
Shear m-factor
page 33 of 36
page 34 of 36
Project Title: North Pier Parking Structure
Project Engineer: Sohban S. Khan, P.E.Engineer of Record: Date:Deformation Compatibility Check Column ID Level Col Width Col. Depth Column Clear Column Col. Steel Model Pseudo Col. Axial Max. Probable Col. Max. Probable Col. Col. Shear Spacing (in.) (in.) Height (ft.) f'c psi Fy ksi Code Lateral Force Load (kips) Moment (k-ft) Shear (kip) Reinf. (in^2/ft) Ties (in.) Line 3/Z Village 36 28 8.33 3000 60 ASCE 41-17 BSE-2E 159 3380 405.76 0.4 12 Village 36 28 8.33 3000 60 ASCE 41-17 BSE-1E 49 1952 234.33 0.4 12 Line 1/Z Village 30 28 8.33 3000 60 ASCE 41-17 BSE-2E 73 1081 129.77 0.4 12 Village 30 28 8.33 3000 60 ASCE 41-17 BSE-1E 73 715 85.83 0.4 12 Line 5/Y Village 18 22 8.33 3000 60 ASCE 41-17 BSE-2E 289 536 64.35 0.4 12 Village 18 22 8.33 3000 60 ASCE 41-17 BSE-1E 286 255.5 30.67 0.4 12 Column ID Level Col Width Col. Depth Column Clear Col. Shear P/(Ag f'c) Av/(bw s) V/(bw d √ f`c) Knowledge DCR Column Shear Remarks (in.) (in.) Height (ft.) Capacity, Vn (kip) (calculated) (calculated) (calculated) LS CP k Status Line 3/Z Village 36 28 8.33 166.42 0.05 0.001 7.35 2 2.5 0.90 2.438 Not Good Column above Shear wall Boundary Element Village 36 28 8.33 166.42 0.02 0.001 4.24 2 2.5 0.90 1.408 OK Column above Shear wall Boundary Element Line 1/Z Village 30 28 8.33 148.02 0.03 0.001 2.82 2 2.5 0.90 0.877 OK Village 30 28 8.33 148.02 0.03 0.001 1.87 2 2.5 0.90 0.580 OK Line 5/Y Village 18 22 8.33 87.38 0.22 0.002 2.97 2 2.5 0.90 0.736 OK Village 18 22 8.33 87.38 0.22 0.002 1.41 2 2.5 0.90 0.351 OK 2/14/2022
Axial m-factor
page 35 of 36
ASCE 41-17
page 36 of 36

CITY OF REDONDO BEACH

SOUTH PIER AND PLAZA

PARKING STRUCTURES
2021-CONDITION ASSESSMENT

CITY OF REDONDO BEACH
Redondo Beach, CA
Prepared for:

Mr. Stephen Proud
Director of Redondo Beach
415 Diamond Street
Redondo Beach, CA 90277
707 Wilshire Blvd, Suite 3650
Los Angeles, CA 90017
213.488.4911
walkerconsultants.com

PARKING CONDITION ASSESSMENT-UPDATE
City of Redondo| Redondo Beach
WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 1
EXECUTIVE SUMMARY 1
IMMEDIATE REPAIRS - RISK MANAGEMENT ................................................2 SUMMARY OF TYPES OF DEFICIENCIES ........................................................2 INTRODUCTION 3
BACKGROUND INFORMATION .....................................................................3 OBJECTIVES ..................................................................................................5 PARKING STRUCTURE DESCRIPTION ............................................................5 RECOMMENDATIONS 17
IMMEDIATE REPAIRS - RISK MANAGEMENT ..............................................17 RECOMMENDED BASE REPAIRS: YEARS 1-5...............................................17 STRUCTURAL ITEMS ...................................................................................18 WATERPROOFING WORK ITEM..................................................................18 MECHANICAL, ELECTRICAL, AND DRAINAGE WORK ITEMS .......................19 MISCELLANEOUS ITEMS .............................................................................19 FUTURE PREVENTATIVE MAINTENANCE 21
BENEFITS OF TIMELY REMEDIATION..........................................................21 OPINION OF PROBABLE COSTS 22
IMPLEMENTATION 24
DISCUSSION 24
OPTION A: SINGLE-YEAR PROGRAM ..........................................................25 OPTION B: 5-YEAR PROGRAM....................................................................25 IMMEDIATE REPAIRS - RISK MANAGEMENT ..............................................25 STRUCTURAL WORK ITEMS........................................................................25 STRUCTURAL ..............................................................................................26 WATERPROOFING SYSTEMS.......................................................................27 OBSERVATIONS 28
LIMITATIONS 30
APPENDIX-A 31
APPENDIX-B 38

TABLE OF CONTENTS

PARKING CONDITION ASSESSMENT-UPDATE
City of Redondo| Redondo Beach
WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 2

EXECUTIVE SUMMARY
The City of Redondo Beach retained Walker Consultants to carry out a Condition Assessment Update of the three existing parking structures - North Pier, South Pier, and Plaza parking structures. This report only includes the South Pier and Plaza parking structures. The North Pier parking structure is issued as a separate report which includes a condition assessment and an updated seismic evaluation. This assessment is intended to provide our professional opinion on the current condition of the structural system and other components, such as waterproofing and drainage, that can affect the service life of the structural system. In addition, the assessment identifies any needed maintenance and repairs to the structural system and waterproofing components and provides our recommendations for implementing the work. We evaluated the overall general condition of the structures with visual observations and compared our new findings to the 2012 and 2015 Walker findings.

On December 22, 2021, Walker sent a draft of this condition assessment report to the City of Redondo Beach.

The two repair programs discussed in the draft and in this final report were developed considering the City’s available annual budget, maximizing benefits from previous work and repair priority, and maintaining parking structure accessibility and occupancy. The first program is to perform risk management items and isolated structural or waterproofing repairs all in a Single-Year. This repair recommendation cannot address all deterioration or stop future deterioration from developing. Additional repair programs can be implemented after the completion of an initial repair program to extend the life of the structure further. The second option focuses on a Five-Year restoration program with the service life extension program focusing on immediate repairs as well as the necessary repairs to extend the useful service life of the structure. Based on the City of Redondo Beach’s request, as an alternative for City to consider, Walker has also developed an opinion of the probable costs of a Ten-Year repair program for the South Pier parking structure in this final report.

This 2021 report incorporates the 2012 and 2015 Walker reports as a reference. Our 2021 findings indicated that, overall, the parking structures have continued to deteriorate compared to the findings reported in the 2012 and 2015 Walker reports. In general, the 2012 and 2015 Walker recommendations remain unchanged except for areas that have been addressed in the 2017 and 2019 repair programs.

The repair plan proposed herein primarily consists of traffic membrane installation, structural repair, corrosion abatement, and Village level wearing slab and pavers replacement/modification of the south parking structure to maintain the life of the structure.

The one immediate concern is to remove all loosely adhered spalled concrete from the soffit of the parking decks.

There should be a review the soffit on a regular basis for loosely adhered spalled concrete.

IMMEDIATE REPAIRS - RISK MANAGEMENT
Risk Management repairs are those required to address safety issues and to mitigate potential unsafe conditions from a risk management perspective.
 Remove all loose and delaminated concrete from the slab and beam underside where delaminated concrete appears on the surface. Repairs to these areas can be deferred and addressed during the implementation of the base repair program shown below. Based on Walker’s recommendation, these delaminated and loose concrete areas were removed by City personnel. It is highly recommended that work should be continued and included in a regular maintenance program.

SUMMARY OF TYPES OF DEFICIENCIES
South Pier Parking Structure
 Concrete floor deterioration and delamination.

PARKING CONDITION ASSESSMENT-UPDATE
City of Redondo| Redondo Beach
WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 3
 Exposed and rusted slab mild steel reinforcement at numerous locations.  Soffit slab deterioration and spalls with exposed and corroded reinforcement.  Concrete beam deterioration with exposed and corroded reinforcement.  Concrete column spalling.
 Waterproofing system deficiencies.

Plaza Parking Structure
 Concrete floor deterioration and delamination.
 P/T beam tendon damage.
 Concrete wall spalling with exposed rebars.
 Waterproofing system deficiencies
We recommend that the City of Redondo Beach perform the base repair program outlined in this report that will correct the observed deficiencies/deterioration and enhance the waterproofing systems to protect the structural slabs and reduce the potential for water infiltration throughout the structures.

We recommend that the City of Redondo Beach budget approximately $15,150,500 to maintain the facility over the next 5 years. The budget costs presented are based on historical data. As a result of the COVID-19 epidemic, prices and schedules have changed. Therefore, these costs should be considered a rough order of magnitude and used for basic planning purposes. The actual costs may not be realized until the project is designed and bid by a contractor. Budgeting for capital improvements and work items will help the City of Redondo Beach plan for necessary funding for the recommended work over the next 5 years. This will help maximize the service life of various components of the structures and maintain the structures in good service condition with minimum downtime.

Please see the attached discussion and photo appendix for a detailed report of our investigation.

Sincerely,

WALKER CONSULTANTS
June 06, 2022
Behnam Arya, PhD, PE Date
Senior Consultant
June 06, 2022
Hassan Suhail Date
Project Engineer I

PARKING CONDITION ASSESSMENT-UPDATE
City of Redondo| Redondo Beach
WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 4

INTRODUCTION

BACKGROUND INFORMATION
Walker Consultants performed a condition assessment for the South Pier and Plaza parking structures located in Redondo Beach, California on November 3rd, 4th and 10th 2021. The evaluation and report will provide our professional opinion of the overall condition of the parking structures and update the prior 2012 and 2015 Walker’s conditional appraisal reports with recommendations for current repair and preventative maintenance needs to maintain the service life for these structures. The City of Redondo Beach has requested Walker to perform a new condition assessment of the parking garages since the last condition assessment of the parking structures was completed more than 6 years ago. The condition assessment update consisted of a visual survey and documentation of observations. It was limited to the supported structural slabs of parking levels, respective exposed rooftop plaza levels and the slabs-on-ground. The condition assessment did not include the occupied retail areas below or between the North Pier and Plaza parking structures nor the commercial timber-frame buildings on top of the South Pier parking structure.

Nomenclature
In the summer of 2011, Walker performed a condition assessment of the parking structures. In June 2012, Walker performed a structural analysis of the North Pier parking structure and prepared an Asset Management Plan (AMP), formerly known as Capital Improvement and Protection Program (CIPP), detailing opinions of probable repair costs over ten years for all three structures. The report was submitted to the City in August 2012 and is referred to herein as the 2012 Walker Report. Also, in October 2015 Walker performed a condition assessment update and prepared opinions of probable costs for two timeline scenarios for the parking structures. The report was submitted to the City in January 2016 and is referred to herein as the 2015 Walker Report. Please refer to the reports mentioned above for additional information.

Previous repairs
As requested by the City of Redondo Beach, the 2015 condition assessments proposed three different scenarios of repair with approximate costs for each option. These options were: A limited three (3) year repair and maintenance program; a 10 – 15-year repair and maintenance program; and an option of full replacement of the Pier Parking Structures. Based on our 2015 condition assessment and the cost associated with the proposed options, the City of Redondo Beach selected the 10 - 15-year repair and maintenance program option. Walker has been awarded several contracts for the development of plans, specifications, and estimates (P, S & E’s) to bid the work out to restoration contractors for the Pier Parking Structures. The first round of repairs was performed in 2017 on the South Pier parking structure and the second round of repairs was completed in 2019 on both the South Pier and North Pier structures. It was also conveyed to Walker during our site visits that some repairs were performed on the Plaza Parking Structure as a change order to the previous repair program.

Since 2017, Walker has provided parking structures restoration and maintenance design services for City of Redondo including the following:
 In 2017, the first repair project occurred mainly on the South Pier parking structure, consisting of the removal and replacement of traffic coating, isolated concrete floor repairs, concrete ceiling repairs, partial concrete beam repairs mainly on spandrels projecting out on the west end of the garage, concrete column and wall repairs, replacement of expansion joints, crack and joint treatments, installation of cathodic protection at repairs, and a few miscellaneous repairs.  In 2019, the second repair project occurred, consisting of the installation of new traffic coating, isolated concrete floor repairs, concrete ceiling repairs, partial and full depth concrete beam repairs, concrete

PARKING CONDITION ASSESSMENT-UPDATE
City of Redondo| Redondo Beach
WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 5
column and wall repairs, replacement of expansion joints, crack and joint treatments, installation of cathodic protection at repairs, replacement of top-level barrier cables and railing, and some miscellaneous repairs. Most of the repairs primarily focused on the Village level of the North Pier parking structures, and some minor repairs were also carried on the Village level of South Pier parking structure.

OBJECTIVES
The objective of this investigation is to perform an update on the overall condition assessment and provide an opinion of probable cost for the necessary repairs, based on the observed conditions as well as our experience with similar parking structure conditions and repair costs. For this investigation and to meet the objective, we performed the following services:

1. Reviewed previous Condition Appraisal Reports prepared by Walker Consultants, dated August 2012 and October 2015 respectively.

2. Reviewed Owner Review Construction documents and project specifications prepared by Walker Consultants, dated January 2017.

3. Reviewed Construction documents and project specifications prepared by Walker Consultants, dated March 2019.

4. Reviewed existing framing plans of the parking structure to aid in our observations.

5. Conducted a field evaluation of the parking structure to document the current exposed conditions of the structural and waterproofing elements. This consisted of visual observation as well as limited nondestructive testing to review the following elements: floors, columns, beams, walls, ceilings, façade, and other structural elements.

6. Identified potential structural related conditions that require immediate attention.

7. Compiled and reviewed all field data to determine possible causes and effects of the documented deterioration.

8. Outlined the repair program requirements for a Single-Year AMP.

9. Outlined the repair program requirements for a 5-Year AMP.

10. Provided an opinion of probable cost for implementing the repairs.

11. Phased the work according to priority over a multi-year program to assist with fiscal planning.

12. Prepared the current report with a summary of observations, including photographs depicting the areas noted in the report, findings.

The objective of the 5-year Budget Forecast is to provide the City of Redondo Beach with an asset management tool for planning and budgeting of capital expenses over the next 5 years. The 5-year plan recommends restoration capital improvements and work items for this parking facility so that the Owner can maximize the service life of the structure with the least amount of capital cost.

PARKING STRUCTURE DESCRIPTION
South Pier Parking Structure
The South Pier Parking Structure was constructed in 1973 and has experienced 48 years of service life. The parking structure was constructed of cast-in-place conventionally reinforced concrete slabs, beams, girders, and columns.

From drawings received, the exposed plaza upper level is referred to as the Village Level, the mid-level is referred to as the Pier Level, and the lowest level is referred to as the Basin Level.

The Village Level has several multi-story wood framed structures used for commercial purposes. Sidewalks and curbs outline a roadway and circular drives throughout the level. The roadway serves as access to the Village

PARKING CONDITION ASSESSMENT-UPDATE
City of Redondo| Redondo Beach
WC PROJECT No. 37-009397.00 June 06, 2022

WALKER CONSULTANTS | 6
Level of the North Parking Structure. Signage at the South Pier entrance to the Village Level limits vehicle weight to 6,000 pounds.

Plaza Parking Structure
The Plaza Parking Structure was constructed in 1981 and has experienced 40 years of service life. The structure is constructed of post tensioned cast-in-place concrete slabs, beams, girders, and traditional reinforced columns.

From drawings received, the exposed upper parking level is referred to as the Plaza Level, the mid-level is referred to as the Pier Level, and the lowest level is referred to as the Basin Level.

The Plaza Level has concrete planters that contain sod, soil, and lightweight filler material on a waterproofed concrete slab. The waterproofing has a filter fabric and drainage layer. The Plaza Level is used for pedestrian traffic only. Portions of this level have a masonry tile application, grouted in-place. Drains are located along the west perimeter wall. Concrete planters surround the perimeter of the structure at this level on the west and north elevations.

Figure 1 shows an aerial view of the parking structures, and Figures 2 to 8 display the floor plans of the South and Plaza parking structures. Figures 9 to 14 show overall views of the exterior elevations of the parking structures.

Figure 15 to 17 shows the recommended locations for traffic coatings.

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 7
Figure 1 – Aerial view of the parking structures (Google Earth Pro)

PARKING STRUCTURE - SOUTH
Project North
Actual North
PARKING STRUCTURE – NORTH
PARKING STRUCTURE – PLAZA

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 8
Figure 2- Basin Level- Slab on Grade, South Pier Parking Structure `
Project North
Actual North

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 9
Figure 3-Lower Pier Level, South Pier Parking Structure Project North
Actual North

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 10
Figure 4- Partial Upper Pier and Lower Village Levels, South Pier Parking Structure Project North
Actual North

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 11
Figure 5- Upper Village and Partial Lower Village Levels, South Pier Parking Structure Project North
Actual North

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 12
Figure 6- Basin Level, Plaza Parking Structure
Figure 7- Pier Level, Plaza Parking Structure Project North Actual North

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 13
Figure 8- Plaza Level, Plaza Parking Structure
Project North
Actual North

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 14
Figure 9- Overview of Village level, (South Pier Parking Structure) (BA1-167) Figure 10- Partial North elevation, (South Pier Parking Structure) (SH2-71)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 15
Figure 11- Partial West elevation, (South Pier Parking Structure) (SH2-248) Figure 12– Overview of Plaza level, (Plaza Parking Structure) (BA1-293)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 16
Figure 13– North elevation, (Plaza Parking Structure) (BA1-304) Figure 14– Partial West elevation, (Plaza Parking Structure) (BA1-290)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 17

RECOMMENDATIONS
Based on our visual observations, we found the South parking structure to be in fair condition and the Plaza parking structure in good condition. In the South parking structure, the concrete floors, ceilings, walls, and columns had some level of deterioration that needs to be addressed. Our assessment did identify specific locations where localized deterioration is visible in the structure. The Plaza parking structure is in good condition. The recent repair project has addressed the significant concrete deterioration and restored components of the waterproofing and structural systems. Based on the current condition of the Plaza parking structure, we recommend relatively fewer repair and protection actions. The implementation of these actions will further increase the long-term service life of the structures and improve the City's investment in the property.

To improve the parking structure's current condition, we have developed a Single Year and a 5-year repair program for the facility. The single-year repair program also has a cost associated with performing the recommended repair program shown in Table 1, and the 5-year program has an associated Asset Management Plan (AMP), respectively.

The 5-year AMP contains repairs to address the currently deteriorated elements and preventive maintenance to address needs anticipated over the next 5-year period. It is important to note that some work items in the 5 -year program, such as recommended repairs on the Village level of the South Pier parking structure, are phased in multiple years. This phasing is provided as an option to the City considering allocated funds per fiscal year. We recommend that the City of Redondo Beach approximate the budget to implement the program over the next 5 years.

As stated above, two options are proposed - the first option is to perform risk management items and isolated structural or waterproofing repairs all in a Single-Year. This repair recommendation cannot address all deterioration or stop future deterioration from developing. Additional repair programs can be implemented after the completion of an initial repair program to extend the life of the structure further. The second option focuses on a Five-Year restoration program with the first-year service life extension program focusing on immediate repairs as well as the necessary repairs to extend the useful service life of the structure.

Please find below our recommendations based on our visual survey, selected impact acoustics survey, previous structural drawings, and documentation provided to us. We also reviewed the 2012 and 2015 Walker reports. The recommendations listed below are in synchronization with the 2012 and 2015 recommendations with relevant updates and editions.

IMMEDIATE REPAIRS - RISK MANAGEMENT
Immediate concerns are defined as items that may reduce pedestrian safety and/or structural integrity if not completed.
 Remove all loose and delaminated concrete from the slab and beam underside where delaminated concrete appears on the surface. Repairs to these areas can be deferred and addressed during the implementation of the base repair program shown below. Based on Walker’s recommendations, the delaminated and loose concrete was removed by City personnel. It is highly recommended that work should be continued and included in a regular maintenance program.

RECOMMENDED BASE REPAIRS: YEARS 1-5
Based on our findings, we recommend implementation of a structured restoration plan, including repairs to structural elements, repairs of deterioration of the topping slab, repairs to the parking structure waterproofing systems and improvements to the facility drainage system to manage water runoff within the structure to address structural concerns, reduce future repair costs, and effectively extend the useful service life of the parking structure. The recommended restoration program concentrates on repairs to the deteriorated sections of the

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 18
structure and future protection of its structural components. We recommend implementing the following repairs and maintenance in the next 5 years:

STRUCTURAL ITEMS
South Pier
 Remove and replace existing wearing slab on the Village level.  Remove and replace existing brick pavers on the Village level.  Partial and full depth concrete repair of all deteriorated structural slab concrete top and underside surfaces on the Village level.
 Partial and full depth concrete repair of all deteriorated structural slab concrete top and underside surfaces on the Pier level.
 Repair isolated spalling of the beam located below the expansion joint present towards the south side.  Partial depth concrete beam, column, and wall repair on the Pier and Basin levels.  Installation of passive cathodic protection systems in all repaired areas.  Rout and seal unsealed cracks and replace failing crack sealant.  Removal of all planters on the Village level, install concrete as needed.  Complete the replacement of the entire fire suppression system of the structure.

Plaza Parking Structure
 Repair damaged P/T beam on the Basin level.
 Repair spalled precast concrete panels on the Village level.  Repair trip hazards at stair tower landing slab and stair treads.  Repair of a limited deteriorated structural slab concrete top and underside surfaces and beams/girders on the Pier level. Installation of passive cathodic protection systems.  Partial depth concrete beam, column wall repair on the Basin level.  Provide protective paint applications on all mechanical/electrical piping, conduit, and fixtures.

WATERPROOFING WORK ITEM
South Pier
 Install a plaza waterproofing system consisting of a fluid-applied urethane waterproofing membrane with drainage and filter fabric layers on top of the structural slab of the Village level.  Install waterproofing sheathing along the base perimeters of the building structures on top of the Village level.
 Install new waterproofing coating on the remaining east side and west side of the Pier level.  Recoat waterproofing membrane on the east side of the Pier level.  Install supplementary drains and incidental piping in select locations of the Village level slab and/or at planter locations.

Plaza Parking Structure
 Recoat the existing urethane traffic membrane on the exposed portion of the Pier level.  Install a urethane traffic membrane on the remainder of the Pier level.  Application of topical corrosion-inhibitor and surface-penetrating sealers on all exposed surfaces that are not coated.
 Waterproofing repairs at tooled joints, cracks, vertical and cove conditions.

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 19

MECHANICAL, ELECTRICAL, AND DRAINAGE WORK ITEMS
 Isolated areas of ponding were observed and should be resolved by either cleaning out the existing drain (if present) or installing a supplementary drain.

MISCELLANEOUS ITEMS
 Clean and paint steel members of all stairs and fencings.  Repaint traffic markings.

Figure 15– Proposed new traffic membrane and existing traffic membrane locations, Partial South Parking Pier Structure – Pier level

RECOAT EXISTING TRAFFIC MEMBRANE

INSTALL NEW TRAFFIC MEMBRANE
KEY:

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 20
Figure 16– Proposed new traffic membrane and existing traffic membrane locations, Partial South Parking Pier Structure- Pier level

RECOAT EXISTING TRAFFIC MEMBRANE

INSTALL NEW TRAFFIC MEMBRANE
KEY:

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 21
Figure 17–– Proposed new traffic membrane and existing traffic membrane locations, Plaza Parking Structure - Pier level

FUTURE PREVENTATIVE MAINTENANCE
Maintenance performed on a regular basis will take full advantage of the structural repairs and waterproofing work. Without maintenance, the facility will not see the expected service life from the structure or the repairs and waterproofing. Typical maintenance includes routine sealing of joints, recoating of wall and floor membranes along with periodic concrete repairs.

Funds for maintenance of the garage should be accrued yearly considering the life expectancies of certain elements such as sealants, coatings, floor membranes, concrete repairs, etc. The life expectancies expressed vary depending on workmanship, quality of materials, use and exposure to elements. After all the work is completed, the supported level should be washed down at least twice a year.

BENEFITS OF TIMELY REMEDIATION
There are many benefits to providing the repair and preventive maintenance program at the earliest feasible time, in addition to the imminent needs of providing the “Immediate Repairs” listed previously.

Long-term delay of repairs significantly increases cost. The cost to repair and maintain this facility will continue to increase at progressively faster rates when deterioration continues as modeled in the following graph. The main benefits from implementing the recommended repairs and waterproofing are:
o Mitigate the infiltration of water and chlorides.
o Maintain the structural capacity and maintain the service life of the structure. o Cost savings due to avoidance of structural repairs that are more expensive and facility shutdown. o Higher levels of service to the users of the facility due to fewer days of downtime because of more extensive structural repairs.

RECOAT EXISTING TRAFFIC MEMBRANE

INSTALL NEW TRAFFIC MEMBRANE
KEY:

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 22
o Provides for a greater degree of safety by inhibiting deterioration mechanisms before they have a chance to cause serious harm.
o Long term delay of repairs significantly increases future costs. o Less noise and disruption both within the garages and the buildings above.

OPINION OF PROBABLE COSTS
The table below provides our opinion of probable construction costs for the recommended repairs for a Single Year restoration maintenance program. The costs were developed using pricing from our database obtained from similar type projects competitively bid in the Los Angeles area. We anticipate the work would be performed during daytime working hours and the work is phased around an operating garage. Costs for a single year restoration maintenance program are based upon single year construction and do not include inflation and escalation factors typically included for multi-year construction.

According to the American Concrete Institute Committee 362, “Repairing an existing deteriorated structure involves many unknowns, uncertainties and risks. Especially with regard to repair of chloride caused corrosion damage, the process is considered an extension of the useful life of the deteriorated structure. It is not equivalent to building a new structure with current technology.”
With the development of repair programs such as in this report, contingency funds must be anticipated and included in any budget for repairs to account for concealed, unknown, or unanticipated conditions. For this type of restoration work, we recommend that a 10% contingency be set aside for potential changes due to unknown “Poor” Garages are between
points B and C
“Fair” and “Good” Garages
are between points A and B
Short-term repairs (3-5
years) only move curve
slightly (B to B1)
Repaired “Fair” and “Good”
Garages are between points
B
1 and C1
Long-term repairs (12 to 20
years) move curve
considerably (A to A1)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 23
conditions. This contingency cost is included in the project costs. The cost estimates are based on second Quarter 2022 dollars.

For a detailed breakdown of each repair program, please see Appendix A of this report.

Table 1 – Single year Repair Program-Opinion of Probable Cost

YEAR BUDGET
2022 $ 2,145,000
Total $ 2,149,500
Recommended Five – Year Repair Program
The table below provides our opinion of probable construction costs for the recommended repairs for a Five-Year restoration maintenance program.

A multi-year phasing scheme has its benefits with respect to capital outlay and phasing of work to maintain greater operation capacity within the facility. Multi-year planning allows the owner to budget capital expenditures annually without creating a significant burden to the budget in any single year. The disadvantage to a multi-year phasing plan is continued degradation of the non-repaired areas. In addition, the cost of the repair program can be expected to grow due to inflation, wage increases, and multiple mobilizations by the contractor.

The following multi-year plan and table outline the effects of inflation, multiple mobilizations, and the growth of deterioration over the multi-year period. Appendix A at the end of this report includes a more detailed cost estimate for this approach.

Table 2 - Five-year Repair program–Opinion of Probable Costs

YEAR BUDGET
2022 $ 2,095,000
2023 $ 3,320,000
2024 $ 5,016,000
2025 $ 4,423,500
2026 $ 296,000
Total $ 15,150,500
NOTE: The budget costs presented are based on historic data. The effects of the COVID-19 pandemic have resulted in changing costs and schedules, therefore, these costs should be considered a rough order of magnitude and used for basic planning purposes. Until the project is designed and bid by a contractor the actual costs may not be realized.

NOTES:

1. Cost opinions are based on historical data and
experience with similar types of work and are based
on 2022 prices.

2. Actual costs may vary due to time of year, local
economy, or other factors.

3. Cost opinions do not include costs for phasing,
inflation, financing or other owner requirements, or
bidding conditions.

4. Costs have been increased 3% for inflation each year.

5. Cost opinions do not include upgrades if it becomes
necessary to bring the structure up to current
building code requirements, seismic upgrades, or for
ADA or similar items.

6. The structure has not been reviewed for the presence of, or subsequent mitigation of, hazardous materials
including, but not limited to, asbestos and PCB.

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 24
Recommended Ten – Year Repair Program (South Pier Parking Structure) Per City’s request, as an alternative for City to consider, Walker has also developed a Ten-Year repair program for the South Pier parking structure. The opinion costs for the recommended 10- year repair program for the South Pier parking structure is currently $ 16,970,000 in 2022 dollar. The recommended South Pier parking structure maintenance and repair budget for the next ten years is shown below in Table 3, followed by a detailed breakdown in Appendix A.

Table 3 - Ten-year Repair program (South Pier Parking Structure)–Opinion of Probable Costs

YEAR BUDGET
2022 $ 1,967,000
2023 $ 1,250,000
2024 $ 1,642,000
2025 $ 2,067,000
2026 $ 2,657,000
2027 $ 2,339,000
2028 $ 1,886,500
2029 $ 1,540,000
2030 $ 152,500
2031 $ 1,469,000
Total $ 16,970,000

IMPLEMENTATION
The outlined repair program can be competitively bid and executed by experienced restoration contractors. The first step in this process is to obtain a quality set of bidding documents prepared by experienced restoration engineers. These documents should be procured to ensure repairs are designed appropriately and quantities are sufficiently estimated to competitively bid the project by restoration contractors.

DISCUSSION
Walker developed the original AMP program for the parking structures in 2012 for the City of Redondo Beach.

The AMP is a dynamic plan that is most effective when scheduled maintenance is performed, and the plan is updated periodically. Since 2012, the City of Redondo Beach has engaged Walker to perform updated evaluations and planning in 2015. The City of Redondo Beach has performed isolated concrete and waterproofing repairs between 2017 and 2019 for needed repairs and preventative maintenance on the parking structures. The purpose of this update is to bring the asset management plan up-to-date based on the previously completed work and Walker’s observations of the parking structures current condition.

The following discussion section provides a brief explanation of the survey findings to aid in understanding the nature and causes attributing to observed deficiencies, deterioration mechanisms, maintenance problems, and damage which form the basis of our recommendations. Refer to Walker's 2012 and 2015 condition appraisal reports for more information on causes attributed to the observed deficiencies.

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 25
Our primary focus of the condition assessment was to identify and update the 2012 and 2015 Walker findings and accordingly develop updated repair protocols that will keep the structures operational for 10 to 15 additional years. In addition to this, we have developed a Single-year repair program that only includes risk management items and isolated structural or waterproofing repairs as discussed below.

OPTION A: SINGLE-YEAR PROGRAM
This repair option includes risk management items and isolated structural or waterproofing repairs. But, as seen in the above figure, repairs cannot address all deterioration or stop future deterioration from developing. This typical scenario is represented by Curve B in the figure above. As seen in this curve, the repair program can address only some of the deterioration, and new deterioration begins to form in areas that were not repaired and at areas surrounding the repairs due to the galvanic ring anode effect.

Additional repair programs can be implemented after the completion of an initial repair program to extend the life of the structure further. But, because new deterioration is anticipated to develop in areas outside of the previous repairs and the life of concrete repairs performed is typically less than the original construction, each future repair program is anticipated to be larger and more costly.

OPTION B: 5-YEAR PROGRAM
This repair option includes risk management items and addresses structural and waterproofing repairs/upgrades to extend the service life of the structure for a limited period. This repair does partially address the corrosion occurring at the spalled areas. This option includes applying a high-performance waterproofing system on the Village slab of the South Parking structure. This waterproofing system will need minimum maintenance and can extend the service life of the garage beyond 10 - 15 years.

Below, please find a review of the conditions of the Redondo Beach South and Plaza Parking Structure.

IMMEDIATE REPAIRS - RISK MANAGEMENT
We observed spalled and loose concrete on multiple locations on both – Pier and the Village level ceiling of the South parking structure. The loose concrete can get detached and introduce a life safety hazard to pedestrians.

Remove all loose and delaminated concrete from the slab and beam underside where delaminated concrete appears on the surface. Repairs to these areas can be deferred and addressed during the implementation of the base repair program shown below. Based on Walker’s recommendation, these delaminated and loose concrete were removed by City personnel. It is highly recommended that work should be continued and included in a regular maintenance program. Walker recommends all supported slabs, beams, columns, and walls to be reviewed on a regular basis by visual means and sounded by hammer tapping along spalls. Any overhead spalled areas found are a potential safety hazard. The City should continue to review areas of potentially loose and cracked concrete and remove them before they become an overhead hazard.

STRUCTURAL WORK ITEMS
Concrete deterioration is typically caused by the restrained movement of the structure, water intrusion and corrosion of the embedded reinforcement.

Corrosion of steel is an expansive process. As the corrosion expands in size, the corroded product pushes outward on the surrounding concrete. When the bursting forces exceed the tensile strength of the concrete, cracking, delamination, and eventually spalling occur within the concrete. Concrete deterioration within structural elements (floors, beams, and columns) is a concern because the deterioration could result in a reduction of the load-carrying capacity. Manifested concrete deterioration will frequently lead to an acceleration of the deterioration and increased repair costs.

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 26
Concrete deterioration is especially harmful to the reinforcement contained within. Steel reinforcement is highly susceptible to corrosion, which occurs when iron (steel) is exposed to oxygen and moisture over time. However, when steel is encased in concrete or mortar, the cementitious material provides a protective oxide layer around the steel reinforcement and prevents the corrosion process from occurring. When steel reinforcement corrodes, it expands causing more cracking and spalling which then decreases the passive corrosion resistance. This selffueling cycle is why it is important to perform repairs as early as feasibly possible to reduce the amount of deterioration the structure experiences.

STRUCTURAL
South Pier Parking Structure
The 2012 and 2015 condition assessments indicated through both observations and material testing that the parking structures are experiencing varying degrees of deterioration. Based on our observations, the condition of the South Pier parking structure has worsened over time. The most likely explanation for this worsening of the structural durability is due to the delay in implementation of the repair recommendations proposed by Walker in 2012 and 2015 condition assessment reports. However, the replacement of the expansion joint on the Village level was a significant step to hinder the water intrusion. We also noticed the repairs performed during the 2017 repair program at the West end of the South parking structure on the spandrel beams seemed to be working well.

During the investigation, several regions were identified where fresh concrete spalling was evident mostly on the elevated slabs.

Even though the parking structure is currently in fair condition, corrosion related deterioration was found throughout the structure. The structure has not yet been greatly affected by the occurring corrosion activity and can be repaired and protected now to mitigate further deterioration. If protection and repairs to the structure are again deferred, then the corrosion activity will continue to deteriorate the structure at an accelerated rate. We have proposed two possible options of repairs and protection. See Appendix A for further information.

Most of the concrete deterioration in the South Pier parking structure is related to long-term environmental exposure that has led to corrosion of the embedded reinforcing steel. In typical reinforced concrete structures, the reinforcing steel is protected from corrosion by a high pH layer that the concrete forms around the reinforcing steel. The high pH layer can breakdown over time when the concrete is exposed to carbon dioxide or chlorides.

Once the high pH layer has broken down, reinforcing steel corrosion can occur when water and oxygen are present.

To mitigate the potential for reinforcing steel corrosion, we provide a two-part strategy to provide long-term corrosion protection:

1. The first part of the corrosion protection strategy is the installation of a waterproof membrane coating on the concrete surfaces (discussed in the following section) to eliminate water penetration into the deck and slow the corrosion process.

2. The second part of the corrosion protection strategy involves the application of an electrochemical treatment to counter the remaining corrosion process after the water is shut off.

Plaza Parking Structure
The recent repair project has addressed the significant concrete deterioration and restored components of the waterproofing and building systems. The concrete structural elements within the Plaza parking structure were generally in good condition, with only a few minor isolated areas of spalled or delaminated cover concrete noted in the entire structure. We recommend repairing these areas by removing all loose concrete and concrete immediately surrounding embedded reinforcement, cleaning any corrosion off the embedded reinforcement,

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 27
applying a corrosion-inhibiting coating to the exposed reinforcement, and finishing the area with a highperformance repair mortar to stop the spread of the damage at this early stage. Also, we identified one partially exposed and damaged post-tensioning beam tendon on the Basin level. We recommended repairing the P/T tendon in both proposed repair programs. In addition, concrete stair deterioration was observed. Deteriorated concrete steps can be a trip hazard to pedestrians and should be repaired. We also identified several unsealed cracks on the Pier level with direction parallel to the primary P-T reinforcement. Based on our visual observation, we do not believe these cracks are a structural concern and it is likely that these cracks were present during Walkers last condition assessment and are now visible. We recommend routing and sealing these cracks to keep moisture away from the reinforcement.

WATERPROOFING SYSTEMS
Waterproofing is essential for structures to meet, and in some cases exceed, their intended lifespan especially in structures exposed to acidic environments such as the South Pier and Plaza parking structures. Parking structures are unique in that they are often exposed to the elements and consequently are often overlooked in terms of their waterproofing measures. Cracking, spalling, or exposed joints are all opportunities for moisture intrusion.

Concrete itself is a porous material and will inherently allow some moisture to penetrate beyond the surface.

Water intrusion is detrimental to the structural integrity and lifespan of a structure, especially for reinforced concrete or steel structures. Waterproofing membranes or sealers are often used in addition to crack and joint sealants to protect the underlying structural elements and prevent water ingress.

South Pier Parking Structure
The Village level consists of a supported deck over the parking structure. The Village level is comprised of topping slab, planters, existing buildings, and brick paved walkways and driveways laid over a structural deck slab. All these components must be thoughtfully designed and detailed to produce a comprehensive and effective system.

Due to the buried and layered nature of the waterproofing elements in similar deck systems, leaks are difficult to discern and locate. It is possible to visually observe leaks through the underside of structural slabs; however, since moisture can migrate laterally above and through the slab, it can be difficult to detect and locate breaches using this method. Test methods such as thermal imaging, and low and high voltage testing exist to provide effective means of locating and repairing leaks within a plaza system.

At the raised sidewalk plaza area, there were several failed sealant joints and unsealed cracks. It is believed that there is a waterproofing system beneath the raised sidewalk. Buried waterproofing systems typically have a life expectancy of 30+ years and can be very costly to replace because they require the removal of the sidewalk. We recommend a program be developed to replace the buried waterproofing system as needed. Our 5-year cost opinion includes full replacement of the plaza waterproofing and concrete topping slab.

Plaza Parking Structure
With the repairs completed under the recent restoration project, the implementation of a preventative maintenance plan provides a programming tool for the City to budget for future maintenance needs of the Plaza parking structure. This preventative maintenance plan focuses on the maintenance cycle of waterproofing items such as traffic membrane, sealants, expansion joints, and other items that protect underlying materials and not day-to-day operational maintenance such as sweeping, trash removal, and cleaning.

With the Plaza parking structure located near the marine environment, the focus of the maintenance will be installing new traffic membrane on the remainder of the Pier level structural slab and recoating the existing traffic coating on the Pier level. Traffic coating also typically sees wear on the high abrasion areas such as sharp turns

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 28
along main travel paths and requires recoating with a texture coat in 6- 8 years. Sealants and expansion joints on covered levels typically have a service life of 10-12 years.

OBSERVATIONS
On November 3, 4, and 10, 2021, Walker Consultants performed a condition assessment of the South and Plaza Parking Structures. The assessment consisted of a visual review of representative exposed structural elements (columns, beams, walls,) and waterproofing elements (sealants and expansion joints). Our assessment also included chain dragging and hammer sounding of representative areas to identify concrete delaminations and possible corrosion of the embedded steel reinforcement. In addition, a limited visual review of the structures’ façade was performed from the Ground level.

The following conditions were noted. The referenced photographs are included in Appendix B.

South Parking structure
Village Level
 Chain drags sounding of the Village level floor revealed isolated floor deterioration. Sounding the previous floor repairs indicated delamination which indicated that the repairs are not generally performing acceptably. Isolated floor cracks were also observed (Photo 1.1 to 1.5).  Typical concrete topping deterioration with exposed and corroded reinforcement was observed primarily on the Village level along drive lanes (Photos 1.6 and 1.7).  Typical Village level soffit slab deterioration and spalls with exposed and corroded reinforcement (Photos

1.8 and 1.9).
 Typical cracked and spalled pavers at Village level (Photos 1.10 and 1.11).  Expansion joint cover plate bolts were seen projecting out, missing or loose (Photos 1.12 and 1.13).  Typical deteriorated / spalled concrete planter walls (Photos 1.14).  Fiber reinforcing wrap on the underside soffit surfaces of the Village level is deteriorated due to the moisture entrapment (Photos 1.15 and 1.16).

Pier Level
 Chain drags sounding of the Pier level floor revealed isolated floor deterioration. Sounding the previous floor repairs indicated delamination which indicated that the repairs are not generally performing acceptably. Isolated floor cracks were also observed (Photo 1.17 and 1.18).  Typical concrete slab deterioration with exposed and corroded reinforcement was observed primarily on Pier level on the northeastern side (Photos 1.19 to 1.21).  Isolated slab edge deterioration and spalls with exposed and corroded reinforcement (Photos 1.22 and

1.23).
 Isolated concrete wall delamination and spalling with exposed rebars (Photos 1.24 and 1.25).  Typical Pier level soffit slab deterioration and spalls with exposed and corroded reinforcement (Photos

1.26 to 1.28).
 Isolated beam deterioration with exposed and corroded reinforcement was observed primarily below the expansion joint (running north-south at south end of the garage) with other isolated locations (Photos

1.29 and 1.30).
 Urethane traffic membrane was observed in poor to fair condition on the West side of the entire Pier level. Most of the high-traffic turning radii has worn surfaces with aggregate roll-out observed (Photos

1.31 and 1.32)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 29
 The fiber reinforcing wraps with added concrete cover at select columns on the west elevations were observed. Also, some of the underside soffit surfaces of the Pier Level had received fiber reinforcing wrap (Photos 1.33).
 Underside drain piping was corroding (Photo 1.34 and 1.35).

Basin Level
 Typical slab on grade spalls (Photo 1.36 and 1.37).
 Minor isolated concrete spalling was observed at the corners of the interior columns at a few locations on the basement and main parking levels (Photo 1.38).

Stair Towers
There are five stair towers servicing the garage: stair #1, located on the northeast side of the garage; stair #2, located on the southeast side of the garage; stair #3, located on the northwest side of the garage; stair #4, located on the southwest side of the garage; and stair #5, located in the center on the middle spline of the garage. Overall, all stair systems appear in fair to good condition, with the following observed:
 Stair #2, 3, and 4:
o Stair treads coating are peeled off (Photo 1.39 and 1.40).  Stair #5:
o Corrosion can be seen on all steel railing surfaces (Photo 1.41 and 1.42).

Plaza Parking structure
Plaza Level
 Typical precast concrete spandrel deterioration with exposed and corroded reinforcement (Photo 2.1 and

2.2).
 Missing roof tiles above the stair tower were observed (Photo 2.3).  Drains were plugged with leaves and minor amounts of trash (Photo 2.4).

Pier Level
 Isolated concrete floor deterioration with exposed and corroded reinforcement was observed primarily on Pier level (Photos 2.5).
 Isolated Pier level soffit slab corner deterioration and spalls with exposed and corroded reinforcement (Photos 2.6 and 2.7).
 Typical floor cracks were also observed (Photo 2.8).
 Typical ceiling cracking was observed parallel to most of the beams of the Pier Level (Photo 2.9) Basin Level
 Isolated delaminated concrete ceiling (Photo 2.10).
 Isolated delamination on the concrete walls exposing corroded reinforcement (Photo 2.11 and 2.12).  Concrete stair deterioration was observed (Photo 2.13 and 2.14).  Isolated damaged P/T rebar of a concrete beam (Photo 2.15).

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022

WALKER CONSULTANTS | 30
Exteriors
 Slab edge spalling and exposed rebar was observed mainly at the southwest end of South Pier parking garage. (Photo 3.1).
 Isolated concrete curb delamination was observed at the south end of South Pier parking garage (Photo

3.2).
 Isolated concrete wall delamination with exposed corroded rebar was observed on the south end of the South Pier parking garage (Photo 3.3).

LIMITATIONS
This report contains the professional opinions of Walker Consultants based on the conditions observed as of the date of our site visit and documents made available to us by the City of Redondo Beach (Client). This report is believed to be accurate within the limitations of the stated methods for obtaining information.

We have provided our opinion of probable costs from visual observations and field survey work. The opinion of probable repair costs is based on available information at the time of our condition appraisal and from our experience with similar projects. There is no warranty to the accuracy of such cost opinions as compared to bids or actual costs. This condition appraisal and the recommendations therein are to be used by Client with additional fiscal and technical judgment.

It should be noted that our renovation recommendations are conceptual in nature and do not represent changes to the original design intent of the structure. As a result, this report does not provide specific repair details or methods, construction contract documents, material specifications, or details to develop the construction cost from a contractor.

Based on the agreed scope of services, the condition appraisal was based on certain assumptions made on the existing conditions. Some of these assumptions cannot be verified without expanding the scope of services or performing more invasive procedures on the structure. More detailed and invasive testing may be provided by Walker Consultants as an additional service upon written request from Client.

The recommended repair concepts outlined represent current generally accepted technology. This report does not provide any kind of guarantee or warranty on our findings and recommendations. Our condition appraisal was based on and limited to the agreed scope of work. We do not intend to suggest or imply that our observation has discovered or disclosed latent conditions or has considered all possible improvement or repair concepts.

A review of the facility for Building Code compliance and compliance with the Americans with Disabilities Act (ADA) requirements was not part of the scope of this project. However, it should be noted that whenever significant repair, rehabilitation, or restoration is undertaken in an existing structure, ADA design requirements may become applicable if there are currently unmet ADA requirements. Similarly, we have not reviewed or evaluated the presence of or the subsequent mitigation of hazardous materials, including, but not limited to, asbestos, and PCB. In addition, seismic evaluation of the subject parking structure for compliance with the current building code was not part of the scope of this project.

This report was created for the use of Client and may not be assigned without written consent from Walker Consultants. The use of this report by others is at their own risk. Failure to make repairs recommended in this report in a timely manner using appropriate measures for safety of workers and persons using the facility could increase the risks to users of the facility. The client assumes all liability for personal injury and property damage caused by current conditions in the facility or by construction, means, methods, and safety measures implemented during facility repairs. Client shall indemnify or hold Walker Consultants harmless from liability and expense, including reasonable attorney’s fees incurred by Walker Consultants as a result of Client’s failure to implement repairs or to conduct repairs in a safe and prudent manner.

PARKING CONDITION ASSESMENT-UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00` June 6, 2022
WALKER CONSULTANTS | 31

APPENDIX-A
TABLE A1 - Executive Summary – 5 Year Budget Forecast

PARKING CONDITION ASSESMENT-UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00` June 6, 2022
WALKER CONSULTANTS | 32
TABLE A1.1 – South Pier Parking Structure – 5 Year Budget Forecast

PARKING CONDITION ASSESMENT-UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00` June 6, 2022
WALKER CONSULTANTS | 33
TABLE A1.2 - Plaza Parking Structure – 5 Year Budget Forecast

PARKING CONDITION ASSESMENT-UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00` June 6, 2022
WALKER CONSULTANTS | 34
TABLE A2 - Executive Summary – Single - Year Budget Forecast

PARKING CONDITION ASSESMENT-UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00` June 6, 2022
WALKER CONSULTANTS | 35
TABLE A2.1 – South Pier Parking Structure – Single Year Budget Forecast

PARKING CONDITION ASSESMENT-UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00` June 6, 2022
WALKER CONSULTANTS | 36
TABLE A2.2 - Plaza Parking Structure – Single Year Budget Forecast

PARKING CONDITION ASSESMENT-UPDATE
City of Redondo| Redondo Beach

WC PROJECT No. 37-009397.00 June 6, 2022
WALKER CONSULTANTS | 37
TABLE A3– South Pier Parking Structure – Ten Year Budget Forecast ITEM
NO. WORK DESCRIPTION
10-YEAR TOTAL
COST

1.00 General Conditions $ 1,846,000

1.1 General Conditions / Mobilization $ 1,846,000 $ 214,000 $ 136,000 $ 178,500 $ 225,000 $ 289,000 $ 254,500 $ 205,000 $ 167,500 $ 16,500 $ 160,000

2.00 Structural / Concrete Repairs $ 7,678,500

2.1 Partial Depth Concrete Floor Repair - Supported Slabs $ 1,921,000 $ 450,000 $ 450,000 $ 346,000 $ 450,000 $ 225,000

2.2 Partial Depth Concrete Repair - Supported Slabs - PCP $ 231,500 $ 52,500 $ 52,500 $ 47,500 $ 52,500 $ 26,500

2.3 Replacement of Wearing Slab - Village Lev el Driv e Lanes / Parking $ 1,470,000 $ 630,000 $ 560,000 $ 280,000

2.4 Concrete Repair - Ceilings $ 500,000 $ 400,000 $ 100,000

2.5 Concrete Repair - Columns, Beams, Walls $ 100,000 $ 100,000

2.6 Concrete Repair - Columns, Beams, Walls and Ceilings - PCP $ 51,000 $ 35,000 $ 7,000 $ 9,000

2.7 Curbs and Walks $ 125,000 $ 125,000

2.8 Remov e Planters $ 25,000 $ 25,000

2.9 Replacement of Wearing Slab - Village Lev el Walks (Pav ers) $ 1,890,000 $ 378,000 $ 378,000 $ 378,000 $ 378,000 $ 378,000

2.10 Replacement of Walks - Village Lev el $ 1,350,000 $ 270,000 $ 270,000 $ 270,000 $ 270,000 $ 270,000

2.11 Slab on Grade $ 15,000 $ 15,000

3.00 Waterproofing $ 4,265,000

3.1 Plaza-Type W aterproofing System -Vilage LevelDrive Lanes $ 840,000 $ 360,000 $ 320,000 $ 160,000

3.2 Plaza-Type W aterproofing System - W alks $ 1,080,000 $ 216,000 $ 216,000 $ 216,000 $ 216,000 $ 216,000

3.3 Rout/SealCracks $ 72,000 $ 72,000

3.4 Contruction JointSealants $ 37,000 $ 37,000

3.5 Cove Sealants $ 30,000 $ 30,000

3.6 Foundation W aterproofing -Vilage LevelBuildings Bases $ 126,000 $ 126,000

3.7 Traffic -Rated DeckCoating -Replace -W estPierLevel $ 1,280,000 $ 240,000 $ 240,000 $ 160,000 $ 640,000

3.8 Traffic Coating -PartialEastPierLevel $ 800,000 $ 120,000 $ 120,000 $ 160,000 $ 400,000

4.00 Stair Tower Repair $ 80,000

4.1 PaintStairStructure Frame $ 40,000 $ 20,000 $ 20,000

4.2 PaintHand Railings $ 40,000 $ 20,000 $ 20,000

5.00 Mechanical / Electrical / Plumbing $ 187,500

5.1 New Drain Instalation $ 70,000 $ 35,000 $ 35,000

5.2 New Piping Instalation $ 35,000 $ 35,000

5.3 Drain Repair/Replacement $ 12,500 $ 12,500

5.4 MEP Alow ance $ 60,000 $ 30,000 $ 30,000

5.5 Clean and Flush Drains/Pipes $ 10,000 $ 5,000 $ 5,000

6.00 Architectural / Miscellaneous $ 81,000

6.1 PaintCeilings,W als,and Columns -SpotRepair $ 30,000 $ 30,000

6.2 RepairTimberRailing Posts & Attatchments $ 3,000 $ 3,000

6.3 Re-PaintTraffic Markings $ 48,000 $ 8,000 $ 8,000 $ 8,000 $ 24,000 10-YEAR TOTAL COST 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 $ 12,292,000 $ 1,425,000 $ 905,000 $ 1,189,500 $ 1,497,000 $ 1,925,000 $ 1,694,500 $ 1,366,500 $ 1,115,500 $ 110,000 $ 1,064,000 Sub Total $ 14,138,000 $ 1,639,000 $ 1,041,000 $ 1,368,000 $ 1,722,000 $ 2,214,000 $ 1,949,000 $ 1,571,500 $ 1,283,000 $ 126,500 $ 1,224,000 Contingency 10% $ 1,416,000 $ 164,000 $ 104,500 $ 137,000 $ 172,500 $ 221,500 $ 195,000 $ 157,500 $ 128,500 $ 13,000 $ 122,500 Consulting & Engineering Fees $ 1,416,000 $ 164,000 $ 104,500 $ 137,000 $ 172,500 $ 221,500 $ 195,000 $ 157,500 $ 128,500 $ 13,000 $ 122,500 Opinion of Annual Budget (2022 Dollars) $ 16,970,000 $ 1,967,000 $ 1,250,000 $ 1,642,000 $ 2,067,000 $ 2,657,000 $ 2,339,000 $ 1,886,500 $ 1,540,000 $ 152,500 $ 1,469,000 Opinion of Annual Budget (Adjusted Future Value) $ 19,214,000 $ 1,967,000 $ 1,287,500 $ 1,742,000 $ 2,258,700 $ 2,990,500 $ 2,711,600 $ 2,252,600 $ 1,894,100 $ 193,200 $ 1,916,800 $ - $ - $ -
$ 160,000
$ - $ - $ - $ 24,000
$ 70,000
$ 40,000
$ -
$ 1,040,000
$ -
$ 254,500 $ 205,000 $ 167,500 $ 16,500
$ 216,000 $ 216,000 $ -
$ 1,150,500
$ 536,000
$ 1,150,500 $ 899,500 $ -
2027 2028 2029 2030 2031
Subtotal (Pre - General Conditions)
2022 2023 2024
$ 41,000
$ 1,065,000 $ 585,000 $ 1,029,500 $ 648,000
$ 360,000 $ 320,000
$ - $ - $ - $ -
$ 214,000 $ 136,000 $ 178,500 $ 225,000
$ - $ - $ - $ -
2025 2026
$ 289,000
$ 40,000
$ 1,150,500
$ 160,000 $ 841,000
$ 117,500
$ 576,000
$ - $ - $ - $ 8,000
$ - $ - $ - $ -
$ 8,000

PARKING CONDITION ASSESMENT-UPDATE
City of Redondo| Redondo Beach
WC PROJECT No. 37-009397.00 June 6, 2022
WALKER CONSULTANTS | 38

APPENDIX-B

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-0

1.SOUTH PIER PARKING STRUCTURE

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-1
Photo 1.1- Concrete delamination, Village level (BA1-50) Photo 1.2- Concrete delamination, Village level (SH1-167)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-2
Photo 1.3- Delaminated previous repair, Village level (BA1-111)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-3
Photo 1.4- Cracks on concrete floor slab, Village level (SH1-165)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-4
Photo 1.5- Cracks on concrete floor slab, Village level (BA1-80)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-5
Photo 1.6- Exposed rebar on floor, Village level (SH1-168)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-6
Photo 1.7- Exposed rebar on floor, Village level (SH1-180) Photo 1.8- Soffit slab deterioration and spalls with exposed reinforcement, Village level (SH1-8)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-7
Photo 1.9- Soffit slab deterioration and spalls with exposed reinforcement, Village level (MM1-52) Photo 1.10- Typical spalled and cracked pavers, Village level (BA1-113)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-8
Photo 1.11- Typical spalled and cracked pavers, Village level (SH1-190) Photo 1.12- Expansion joint cover plate bolts projecting out, Village level (BA1-139)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-9
Photo 1.13- Expansion joint cover plate bolts projecting out, Village level (SH1-185) Photo 1.14- Typical spalled concrete planter walls, Village level (BA1-58)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-10
Photo 1.15- Deteriorated fiber reinforcing wrap, Village level (SH1-88) Photo 1.16- Deteriorated fiber reinforcing wrap, Village level (SH1-96)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-11
Photo 1.17- Concrete delamination, Pier level (SH2-7)
Photo 1.18- Concrete delamination, Pier level (SH2-21)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-12
Photo 1.19- Exposed rebar on floor, Pier level (SH2-8)
Photo 1.20- Exposed rebar on floor, Pier level (SH2-17)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-13
Photo 1.21- Concrete spalling at slabs, Pier level (SH2-10) Photo 1.22- Isolated slab edge spall, Pier level (MM1-129)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-14
Photo 1.23- Isolated slab edge spall, Pier level (SH1-198) Photo 1.24- Exposed rebar on wall, Pier level (SH1-117)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-15
Photo 1.25- Exposed rebar on wall, Pier level (SH1-118) Photo 1.26- Soffit slab deterioration and spalls with exposed reinforcement, Pier level (SH1-258)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-16
Photo 1.27- Soffit slab deterioration and spalls with exposed reinforcement, Pier level (SH2-58) Photo 1.28- Soffit slab deterioration and spalls with exposed reinforcement, Pier level (SH1-249)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-17
Photo 1.29- Concrete beam spalling below the expansion joint, Pier level (MM1-45) Photo 1.30- Concrete beam spalling below the expansion joint, Pier level (MM1-46)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-18
Photo 1.31- Compromised traffic membrane, Pier level (SH1-52)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-19
Photo 1.32- Compromised traffic membrane, Pier level (SH1-48)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-20
Photo 1.33- Fiber reinforcing wraps with added concrete cover, Basin level (SH1-271)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-21
Photo 1.34- Corroded drainpipe, Pier level (MM1-33)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-22
Photo 1.35- Corroded drainpipe, Pier level (MM1-82)
Photo 1.36- Deteriorated slab on grade, Basin level (SH2-44)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-23
Photo 1.37- Deteriorated slab on grade, Basin level (SH2-48) Photo 1.38- Isolated concrete column spalls, Basin level (SH1-241)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-24
Photo 1.39- Typical stair coating worn off, (SH2-88)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-25
Photo 1.40- Typical stair coating worn off, (SH2-118)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-26
Photo 1.41- Corroded stair railing, (SH2-103)
Photo 1.42- Corroded stair railing, (SH2-104)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-27

2.PLAZA PARKING STRUCTURE

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-28
Photo 2.1- Spalled precast concrete spandrel with exposed rebar, Plaza level (SH2-265) Photo 2.2- Spalled precast concrete spandrel with exposed rebar, Plaza level (SH2-266)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-29
Photo 2.3- Missing roof tiles on the stair tower, Plaza level (SH2-130) Photo 2.4- Clogged drains, Plaza level (SH2-267)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-30
Photo 2.5- Exposed rebar on floor, Pier level (SH2-155) Photo 2.6- Soffit slab deterioration and spalls with exposed reinforcement, Pier level (BA1-326)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-31
Photo 2.7- Soffit slab deterioration and spalls with exposed reinforcement, Pier level (BA1-327)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-32
Photo 2.8- Cracks on concrete floor slab, Pier level (SH2-151)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-33
Photo 2.9- Cracks underside of concrete slabs, Pier level (BA1-319) Photo 2.10- Concrete spalling underside the slabs, Pier level (SH2-185)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-34
Photo 2.11- Exposed rebar on wall, Basin level (SH2-166)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-35
Photo 2.12- Exposed rebar on wall, Basin level (SH2-198)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-36
Photo 2.13- Damaged concrete stair treads and risers, (SH2-206) Photo 2.14- Damaged concrete stair treads and risers, (SH2-209)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-37
Photo 2.15- Damaged beam P/T rebar, Basin level (SH2-174)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-38

3.EXTERIORS

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-39
Photo 3.1- Exposed and corroded rebar, Exterior - South elevation (SH2-252) Photo 3.2- Exposed and corroded rebar, Exterior - South elevation (SH2-257)

PARKING CONDITION ASSESSMENT - UPDATE
City of Redondo| Redondo Beach
WALKER PROJECT No.37-009397.00 June 06, 2022
APPENDIX-B: PHOTOGRAPHS | B-40
Photo 3.3- Concrete delamination, Exterior - South elevation (SH2-262) WALKER CONSULTANTS | 38
From: Jim Light <[email protected]>
Date: June 12, 2022 at 8:59:26 PM PDT
To: Cameron Harding <[email protected]>, Ted Semaan <[email protected]>, Bill Brand <[email protected]>, Todd Loewenstein <[email protected]>, Nils Nehrenheim <[email protected]>, Zein Obagi <[email protected]>, Elizabeth Hause <[email protected]>, Mike Witzansky <[email protected]>, Eleanor Manzano
<[email protected]>, Michael Klein
<[email protected]>
Cc: Jacob Varvarigos <[email protected]>, Lang Mara <[email protected]>, Aga Chenfu <[email protected]> Subject: Budget Report Item related to Wilderness Park Pond CAUTION: Email is from an external source; Stop, Look, and Think before opening attachments or links.

All,
First, I want to thank all of you for the support we have gotten from the City and from City staff in our efforts to rewild Wilderness Park and on helping make our last Earth Day event a real success. The level of support is very greatly appreciated by SBPC. That said, we have reviewed the Budget Request item related to the ponds at Wilderness Park and we do have some concerns about the cost estimates given.

The biggest questions we get while working Wilderness Park are:
- what happened to the lower pond; and,
- is the city going to replace it?
SBPC did a rough, conservative cost estimate for the lower pond refurbishment along with the stream. This estimate is based on research we have done related to reestablishing wetlands at the AES site and includes review and some input from an artificial pond contractor. Our estimate left the old concrete in place and assumed a shallower (max 1.5’) pond using a liner and refurbishing the stream with a flexible seal coating. The pond would have-mixed filtration with a mechanical and bio filter, but utilizing water plants covering about 30% of the surface as a natural filtration feature. Our estimate was pre-inflation and was very conservatively $150K - and that included a healthy management contingency.

We believe the pond could be far more natural than the previous pond and require much less maintenance. We have tested some native water plants in the upper pond to see if they would survive - and they are doing well. So water plants are feasible. We only used 30 plants in the test which are far too few to see any results from a filtering perspective, plus the current design is not optimized to use plants as a filter mechanism.

As to ADA compliance we believe the city is providing a like-feature in the upper pond and thus ADA compliance for the lower pond is not required. However, by applying ADA compliance required of trails in similar natural parks, we believe, even if the City must comply or simply desires ADA accessibility, the staff estimate is greatly overestimated. The current packed roads of the park are plenty of width for compliance and they meet the hardness standards for natural trails.

And there are multiple paths to the lower pond. The one to the east and down the middle of the park seems to have the least slope. If there is an area of that road that would require rest stops per ADA rules, there is ample space to provide the periodic level place to the side or even on the road itself with some minor grading.

The city could also explore providing one or more electric wheelchairs designed for outdoor trails that could easily and safely navigate the current unpaved roads through the park. These wheelchairs range widely in cost - a quick survey revealed prices from $4000 to $15,000. Even at the high end two or three of these would be less expensive than the Budget Report item estimate for ADA compliance.

We would welcome the opportunity to sit down with Public Works and Community Services to discuss the potential of reworking the lower pond concept and estimate to a reduce the cost of both replacement and operation while improving the environmental friendliness of feature. We feel both ponds are highly desired features that the City should replace/improve. We further believe the upper pond can be improved with the same approach when major repair/replacement is desired.

Thank you for your consideration on this matter.

VR
Jim Light
President, South Bay Parkland Conservancy
Certified California Naturalist
310-989-3332
From: Vivek Gupta <[email protected]>
Sent: Tuesday, June 14, 2022 5:54 AM
To: jeffrey gaul <[email protected]>
Cc: [email protected]; Eleanor Manzano <[email protected]>; Mike Witzansky <[email protected]>
Subject: Re: request to speak for 3 minutes at June 14th Redondo Beach City Council Meetings CAUTION: Email is from an external source; Stop, Look, and Think before opening attachments or links.

Hey everyone, this is what I plan to speak today at the council meeting ·
In the last few months, we have heard from the hard working and caring people working at PATH, Los Angeles Homeless services authority, Harbor Interfaith, Department of Public Health/Substance Abuse Prevention and Control who are doing amazing work helping those suffering from homelessness and drug related issues.
·It seems the issue Is that there is a limiting step of translating some of the work and successes to the general population. Initially I was thinking we needed to find out where people are getting their news and try to intervene in those sources but eventually I realized the only way to to do this in the 21s century is to increase our social media presence. ·Increasing our social media efforts can help us spread the efforts and interventions of our partners who are doing great things to make Redondo better. ·Additionally, an increased social media presence will help us solicit feedback in a more effective way, and can possibly help with increased tourism, build a sense of community and togetherness amongst our current residents, and can be an efficient way to spread information.
·Example, Roanoke VA (https://www.governing.com/archive/gov-integrating-socialmedia-roanoke.html) o
Officials integrated social medial into the daily routine of the city; followers grew from 22K to 100K in a year
oOn website, can view FB, twitter, Instagram, flickr streams oAccounts act like 311 services, where users query, complain or ask for help oHas helped with increased tourism traffic aided by free publicity generated by photos posted by citizens + city spends 100 a month of FB advertising to attract outsiders to the city
oHas set straight forward policies => obeying the law, refrain from making controversial remarks, designated a person in each city dept to administer activity, paid social media consultant
oCONS
§ More work
§ Dealing with potential for trolls, controversy, etc.
·Other cities doing this well: Asheville, NC; Carrollton, TX; Clinton County, OH; Fredericksburg, TX; Florida Keys, FL; Glenwood, CO; Jackson Hole, WY; Sedona, AZ; Tranverse City, MI – there is no twitter, or facebook page for redondo ·I spoke with Luke Smude, assistant to the city manager, and I know there are great efforts underway to improve our website, and more distant plans to improve redondo’s social media, but I am speaking today to focus the city’s attention to this issue in order to perhaps marshal increased resources and urgency to this goal so that this becomes more of a priority.
·There of course will be costs and time involved, likely will require hiring outside vendors to increase our visibility; but I believe this will be an overall benefit, and maybe even an economic benefit with added tourism dollars + potential added overall economic activity by increasing popularity of Redondo beach
·I’ve been living here 13 years, and love Redondo, but feel that increasing our social media presence can help continue getting our city known to the broader world, but more importantly, helping to foster our sense of community, something that is needed today more than ever in modern day America.

On Fri, Jun 10, 2022 at 8:09 AM jeffrey gaul <jeff [email protected]> wrote:

Hello Mike and Eleanor
My fellow commissioner Vivek Gupta would like to speak with the Council Tues June 14th on social media and the City website, etc.

Previous experience indicates its best to send by e-mail a brief draft of what you wish to say, show up around 5:30pm, fill out one of the cards, and while waiting for the meeting to start say hello to the other audience members. I may show up as well - should be fun to watch live or on-line!
Hope we can see the City Management team at the July PSC meeting. We appreciate the opportunity to collaborate with the City to improve service.

Jeff Gaul
RBPS Commissioner
Table of Contents Page 1

CITY OF REDONDO BEACH

PROPOSED BUDGET RESPONSE REPORTS
FY 2022-23 PROPOSED BUDGET
BLUE FOLDER – 6.14.22
The following is a list of questions raised regarding the FY 2022-23 Proposed Budget. The corresponding answer to each of these questions (the “Budget Response Report”) follows in the sequence reflected.

Question No.

What City vehicles and equipment are scheduled for replacement by the Public Works Department in Fiscal Year 2022-23 through DP# 38 and DP# 39? What is the status of Zero-Emission Vehicle and Low-Emission Vehicle purchases for the City Fleet?
37  What infrastructure upgrades have been identified in the Riviera Village parking study and what is their estimated cost? 38
 What is the cost to design and install new streetscape furniture in Riviera Village? 39
 What is the status of the skate park installation at Pad 10? 40  How do neighboring cities manage/administer credit card processing fees? 41  What would be required to transition City banking services from Bank of America to another competing bank? 42

What would be the cost to increase programming at the Perry Park and Anderson Park Senior Centers as well as the Teen Center, and what is the general cost to expand these facilities?
43  What is the annual cost and resource allocation for the City’s programs and services implemented in response to homelessness? 44
Question No.

Table of Contents Page 2

What is the total estimated cost to design and install drought tolerant landscaping, pathways, and a pollinator fountain on the SCE right-of-way property licensed by the City, west of Pacific Coast Highway? 45 Attachment: SCE ROW Improvements – Illustrative Site Analysis 45A Attachment: SCE ROW Improvements – Cost Estimates 45B
BRR #37

Page 1 of 6 ends

CITY OF REDONDO BEACH
Budget Response Report #37
June 14, 2022
Question:

What City vehicles and equipment are scheduled for replacement by the Public Works Department in Fiscal Year 2022-23 through DP# 38 and DP# 39? What is the status of Zero-Emission Vehicle and Low-Emission Vehicle purchases for the City Fleet? Response:

The Vehicle Replacement Fund (VRF) was established by the City during Fiscal Year (FY) 1983-84. It is a best management practice tool that allows the City to efficiently replace vehicles and equipment. The purpose of the Vehicle and Heavy Equipment Replacement Program is to evaluate, maintain, and replace vehicles and equipment on a schedule that optimizes their usefulness, avoids major repairs and periods of downtime, and captures ongoing technological improvements in vehicle safety, efficiency, environmental sustainability and performance. Most City vehicles historically have been replaced every 4-12 years, depending on their type and function, at an aggregate cost of between $600,000 and $1,500,000 each year.

Vehicle Replacement Fund (VRF) Balance
In the proposed FY 2022-23 Budget the expected beginning fund balance of the VRF is $7.26 million prior to any decision packages being approved. It’s important to note that the funding for the VRF comes from a variety of Department budget allocations depending on the Department’s number and type of vehicles, maintenance and operation history, and use of fuel, and from other miscellaneous sources. Expenditures of the VRF are comprised of personnel, maintenance and operations, internal service fund, and overhead. Therefore, depending on the amount and types of vehicles/equipment that are due for replacement in the given fiscal year, the fund balance can increase or decrease significantly. Historically, the ebbs and flows in the fund balance are dependent on the amount and type of vehicles being replaced. Although the fund balance may increase due to the delayed replacement of vehicles/equipment, the need and funding to replace those vehicles/equipment remains and often at increased costs given inflationary impacts on goods and services.

Staff will continue to reassess the VRF structure on a year to year basis and evaluate individual vehicles/equipment to ensure the replacement cycle is in line with optimizing the full life of each vehicle/equipment without creating excessive maintenance and repair costs. It should be noted that in FY 2020-21 the City Council directed the extension of all vehicle replacement schedules for a two-year period to reduce annual VRF allocations.

As a result, maintenance and repair costs have increased, as additional vehicle components reach the end of their useful life and require replacement.

BRR #37

Page 2 of 6 ends

Decision Package #38 Annual Vehicle Replacement
This year staff is recommending, via Decision Package #38, that nineteen vehicles/equipment be replaced at a total cost to the Vehicle Replacement Fund of $1,039,272. The appropriation is necessary for the regularly scheduled replacement of nineteen (19) vehicles/equipment used by City employees to carry out their work assignments. Of the 19 vehicles/equipment, ten (10) are Police vehicles for administration, patrol, parking enforcement, and code enforcement divisions. One (1) vehicle is for the Building Inspection unit within the Community Development Department.

Seven (7) vehicles are needed for the Public Works Department and consist of two (2) trucks and one (1) electric cart for the harbor division, three (3) trucks for parks and facilities, one (1) vehicle for engineering. Additionally, one (1) generator is scheduled for replacement. Per City Council direction, when feasible, Zero/Low Emission Vehicles (ZEV/LEV) are purchased. Public Works will continue to coordinate with the Departments to follow that direction for the FY 2022-23 vehicle purchases and that list is provided later in this report.

Decision Package #39 Vehicle Replacement Purchases FY2021-22 Carryover Decision Package #39 recommends the re-appropriation of the unused funds ($980,144) from FY 2021-22 to complete previously scheduled vehicle purchases. None of the sixteen (16) approved FY 2021-22 vehicles/equipment were delivered to the City due to supply chain issues/shortages in the market. As an example, from the FY 2020-21 approved vehicles list there are still nine (9) Ford CNG trucks that are ordered and not yet delivered and one (1) Chevrolet Bolt EV that will be delivered in coming weeks. The re-appropriation is needed now rather than as part of the regular fiscal year-end discussion in December to enable staff to execute the procurement of any outstanding vehicles between the months of July and November in the event they are made available for acquisition. Since the writing of the Decision Packages, Public Works was able to acquire two (2) additional vehicles from the FY 2021-22 vehicle replacement list.

Removed from this request are two Police Patrol Sergeant Chevrolet Tahoes (units #651 and #652) that were approved by Council for purchase on June 7, 2022. The adjusted carryforward request in Decision Package #39 for the remaining three (3) vehicles and five (5) generators to be purchased is $821,546 as a result of the recent acquisitions.

This figure includes $40,000 approved by City Council for the City Attorney's Homeless Outreach vehicle not current included in the VRF or the table below.

BRR #37

Page 3 of 6 ends

Table 1: FY 2022-21 Status of Vehicles/Equipment Approved for Purchase Increased costs
Given upfront cost of all vehicles, including CNG vehicles, changing needs of departments, and supply chain-related price increases, there are several vehicles that are underfunded in the VRF for FY 2022-23 purchase. This amount is estimated at $86,960 and is included in the requested appropriations in DP’s #38 and #39. An ISF adjustment will be made at Mid-Year to fund the VRF for these overages based on the final purchase price.

Supply Chain Issues
Current supply chain issues have severely impacted the future availability of vehicles/equipment across all sectors and manufactures from small/mid-size vehicles, Zero-Emission/Low Emission vehicles, (ZEV/LEV), through to heavy duty trucks and generator equipment. Long delivery delays and costs well above MSRP are also experienced as a result of the national/global inventory issue. According to Cox Automotive, a leading provider of automotive data, current US Inventory supply shrunk 54% April 2021 to April 2022 from 65 to 35 day’s supply. Recently, that level has dropped even further, to around 28 day’s supply. The impact of the shortage is particularly challenging for municipalities/fleet purchases given public agencies procurement processes.

The vehicles/equipment recommended for purchase would be acquired through the City’s regular purchasing procedures. The procedures contain a number of competitive purchasing options including the use of a “Piggyback” Bid which is a procedure of procuring goods or services by utilizing another public entity's recent Request for Unit Year Existing Vehicle Assigned Dept
Total Funding
per unit Status
104 2008 CHEVROLET SUBURBAN-EQ OPS-SPEC-SRVS F $ 191,492 On Hold 651 2017 CHEVROLET TAHOE PATROL-Sergeants P $ 79,298 In Progress 652 2017 CHEVROLET TAHOE PATROL-Sergeants P $ 79,298 In Progress 660 2017 FORD UTILITY PATROL P $ 66,112 In Progress
661 2017 FORD UTILITY PATROL P $ 66,112 In Progress
672 2017 FORD UTILITY SLICK TOP PATROL P $ 65,717 In Progress 675 2017 DODGE RAM CHARGER SLICK TOP PATROL P $ 55,205 In Progress 678 2017 DODGE RAM CHARGER PATROL P $ 55,748 In Progress 51-06 2006 GMC CANYON P/U XTRA CAB CODE ENF PL $ 29,074 FY2022-23 DP#39 59-07 2007 GMC CANYON P/U XTRA CAB BUILDING PL $ 29,074 FY2022-23 DP#39 261-08 2008 FORD RANGER UNIT 378 MOUNTED TO TRUCK UPLANDS MAINT PW $ 18,869 FY2022-23 DP#39 G-1 1999 CATEPILLAR 3306 GENERATOR SEWER PW $ 150,969 FY2022-23 DP#39 G-11 1999 GENERAC 99A03799-S GENERATOR BUILDING OCCUPANCY PW $ 246,145 FY2022-23 DP#39 G-12 1999 ONAN 175DGFB GENERATOR* BUILDING OCCUPANCY PW $ 149,210 FY2022-23 DP#39 G-16 1999 GENERAC 98A06019-S GENERATOR BUILDING OCCUPANCY PW $ 96,804 FY2022-23 DP#39 G-2 1999 MQ POWER DCA-25SSIU SEWER PW $ 27,420 FY2022-23 DP#39 BRR #37

Page 4 of 6 ends

Proposal (RFP) or Request for Bid (RFB), or the National Joint Powers Alliance (NJPA) Contract Cooperative Purchasing Program. Cooperative purchasing programs provide valuable benefits to state and local governments. By attaching to national or regional cooperatives, an agency has immediate access to competitively solicited contracts and guaranteed pricing and delivery options without expending staff resources on the preparation of its own RFB. Pricing is often attractive because of the purchasing power of these cooperatives.

However, due to the shortage of inventory in general, there is a limited availability of vehicles sold to fleets through cooperative purchasing programs, which has created additional challenges for the City including:
• Difficulty sourcing the appropriate vehicles required for departments’ needs • Short window open to fleet to procure vehicles (for recent PD Tahoe purchase this was approximately a 24-hour window)
• Cancelation of orders
• Long delivery times once the Purchase Order is issued • Long wait times for parts/materials if vehicles need to be retro-fitted (CNG etc.) Public Works continues to research all vehicle options, including and specifically ZEV/LEV options, work with dealer/suppliers to stay informed of manufacturing inventory and windows for fleet purchasing, stand ready to move as quickly as possible to procure any suitable vehicles, and work with departments to ensure all possible vehicle options are explored.

Fuel Costs
According the U.S. Department of Energy a “vehicle that gets 30 MPG will cost you $1,155 less to fuel each year than one that gets 20 MPG (assuming 15,000 miles of driving annually and a fuel cost of $4.62). Over a period of 5 years, the 30-MPG vehicle will save you $5,775.” www.fueleconomy.gov
Despite, the higher MSRP of many of the EV options, Council recognizes the environmental and potential economic benefits of the EV options. The Department of Energy provides a fuel economy calculator to allow consumers to compare the cost of fuel by manufacture and vehicle type. A quick comparison of a 2022 Kia Niro (regular gasoline) versus a 2022 Kia Niro Electric shows an annual savings of $829 in fuel costs based on 15,000 miles of driving. At Council’s direction Public Works is exploring all feasible EV vehicle options to harness these savings. However, at this time there are no field-ready options for the City’s fleet needs and there is still a heavy reliance on gas and CNG vehicles. Decision Package #35 – Increased Fuel Costs (Gasoline and CNG) requests additional funding to support fleet fuel costs in the face of forecasted sustained high costs during some or all of FY 2022-23.

Status of Zero/Low Emission Vehicles (ZEV/LEV)
The Public Works Department continues to work with other departments to recommend ZEV/LEV whenever possible and feasible. A number of LEV/Hybrid vehicles have been BRR #37

Page 5 of 6 ends

deployed successfully in various departments. To date, there has been limited availability of ZEV that meet the needs of most departments. The City’s ZEV/LEV vehicle total is 3 EV, 10 Hybrids and 16 CNG trucks out of a total of 193 vehicles .

Public Works has worked to identify vehicles that are scheduled to come to market in 2023 that will meet City needs. For example, in the Police Department, Parking Enforcement and Animal Control Municipal Service Officers (MSOs) are all cross-trained to perform both parking and animal control calls while on duty in any given shift. Working with the Police Department, Public Works has identified multiple EV vehicles (crossovers and trucks) that are appropriate for the dual role/functionality of the MSOs. That said, the challenge for all departments in the coming year will be to procure these high-demand vehicles in a marketplace with extremely limited inventory and to create the infrastructure to support the vehicles.

A large percentage of the City’s fleet is comprised of public safety vehicles (Police and Fire) that currently have limited or no EV options available for purchase. There continues to be the development of economically viable, hybrid pursuit-rated police vehicles.

However, there is still no sufficient data on their performance that would allow staff to recommend moving in that direction at this time.

As manufacturers expand their ZEV/LEV portfolio, Public Works will continue to find feasible vehicles from those offerings. In accordance with Council direction, the Public Works Department is looking to replace all standard light/medium duty trucks with alternative fuel trucks when feasible. At this time only CNG vehicles are available (with wait periods of more than 18 months). Public Works is also looking toward the planned release of EV trucks from a number of manufacturers in the coming years.

EV Infrastructure City Fleet Charging Needs
In March 2022, Public Works completed the first EV charging station project, installing 11 ChargePoint stations (total 18 ports) that service the existing City EV vehicles and introduced them on City property for paid public access. The Public Works Department is now in the preliminary stages of consulting with City departments, Southern California Edison and EV charging station vendors to determine next steps to create the infrastructure necessary to support a growing City EV fleet. Critical will be the development and funding of a master EV infrastructure plan to support the City’s future fleet needs and take advantage of potential funding opportunities. This will be a multiyear project as the Department works within the constraints of space, aging City facilities & infrastructure and the availability of funding.

Planned ZEV/LEV Purchases in FY 2022-23
All of the vehicles/equipment recommended for replacement, including proposed ZEL/LEV vehicles are listed in the following table:

BRR #37

Page 6 of 6 ends

Table 2: Proposed FY 2022-23 Vehicle Replacement
Unit Year Existing Vehicle Assigned Dept
Total Funding
per unit ZEV/LEV
621 2008 DODGE RAM CHARGER ADMIN P $ 41,410 LEV
57 2009 TOYOTA PRIUS HYBRID BUILDING PL $ 38,963 LEV
405 2009 TOYOTA PRIUS HYBRID CODE ENF P $ 38,963 LEV
354 2009 FORD F-250 3/4 TON PICKUP PARKS PW $ 60,000 LEV 241-09 2009 FORD F-250 PARKS PW $ 61,833 LEV
58 2009 TOYOTA PRIUS HYBRID ENGINEERING PW $ 38,463 LEV 647 2018 DODGE RAM CHARGER Equipped PATROL P $ 56,208 N/A 649 2018 FORD UTILITY Equipped PATROL P $ 67,000 N/A
665 2018 FORD UTILITY Equipped PATROL P $ 67,417 N/A
671 2018 FORD UTILITY Equipped PATROL P $ 67,417 N/A
401 2009 TOYOTA PRIUS HYBRID-Moved from E-B unit 7 PATROL- PARKING ENF P $ 38,463 LEV/ZEV 403 2009 FORD ESCAPE HYBRID PATROL- PARKING ENF P $ 49,666 LEV/ZEV 404 2009 FORD ESCAPE HYBRID PATROL- PARKING ENF P $ 49,666 LEV/ZEV 408 2009 JEEP WRANGLER RHDRIVE PATROL- PARKING ENF P $ 43,474 LEV/ZEV 349 2009 FORD F-350 1-TON PICKUP-EQ UPLANDS MAINT PW $ 71,000 N/A 872 2013 TAYLOR-DUNN ELECT CART UPLANDS MAINT PW $ 12,276 N/A 243-09 2009 FORD F-250 UPLANDS MAINT PW $ 67,749 N/A
348-09 2009 FORD F-350 1-TON PICKUP-EQ BUILDING OCCUPANCY PW $ 71,000 N/A G-14 2018 GENERAC 98A06015-S GENERATOR FIRE STATION 1 PW $ 98,304 N/A BRR #38

Page 1 of 2 ends

CITY OF REDONDO BEACH
Budget Response Report #38
June 14, 2022
Question:

What infrastructure upgrades have been identified in the Riviera Village parking study and what is their estimated cost?
Response:

In Fiscal Year 2019-20, the City Council approved funding for a parking study, primarily of paid parking, in the Riviera Village area. The scope of work and contract with Walker Consultants was finalized and approved by Council in February 2020. Unfortunately, before field work could begin, the project was halted due to COVID-19. The field work was resumed in October 2021 when it was possible for Walker to consistently deploy staff and when it was believed that parking conditions had “normalized’ somewhat in a postCOVID environment. The parking study was completed in March 2022 and the final report will be brought to City Council this summer for review and direction regarding potential operational changes to various parking programs in the Riviera Village.

Operational Changes with Cost Associations
The majority of the parking study recommendations focus on operational changes to City parking programs and employee best parking management practices in the Riviera Village. These include, but are not limited to, changes to permit programs, time-parking limits, fee schedules, and parking locations for permit users. There are operational recommendations that if implemented would have associated costs including: increasing use of technology to make various elements of the parking programs more efficient, improving the customer purchasing experience, and streamlining enforcement.

Walker recommends moving the City’s permit purchasing programs fully online and moving away from physical hard copy permits/stickers or hanging tags to digital enforcement. There is potential to do this using existing vendors but the costs will need to be explored further. Automatic License Plate Readers (ALPRs) would be required to facilitate electronic enforcement for permits and could also be used to enforce other parking payment systems. Estimated costs associated with ALPR systems for this use are $50,000 per unit, not including the estimated cost of the required vehicle to mount it on ($38,000).

In addition to operational improvements, the study recommends adjusting the fee schedules of various parking programs, most specifically the parking permit programs.

As Walker’s presentation to Council is scheduled for this summer, any Council direction to explore increases to the fees as listed on the Master Fee Schedule would be returned BRR #38

Page 2 of 2 ends

to City Council for consideration as part of the midyear budget review or the FY 2023-24 budget adoption.

Parking Supply Increase with Cost Associations
The parking study demonstrated that at peak-times the RV parking needs were close to, or equal to, demand. Additionally, following a review of three years of revenue data, Walker remarked that “despite fewer meters in service due to the presence of dining decks, meter revenue was roughly equal to meter revenue in 2019 before the COVID-19 pandemic.” This indicates that the removal of some parking in prime areas resulted in a shift in parking demand to meters and areas that were previously underutilized. Walker notes that “the removal of dining decks and the restoration of parking meters would likely pull demand back into the core of the Riviera Village from the outlying parking meters and the Triangle Lot.”
Aside from the restoration of parking spaces forfeited to dining decks, the study provides other options for increasing parking including 1) stackable parking (employeemonitored/valet type) in a section of the Triangle Lot or 2) closing some of the centrally located ingress/egress points in the Triangle Lot. Both of these options would increase the parking capacity by 15-16 spaces and have an estimated infrastructure cost of $15,000 - $30,000 depending on the option selected. Both options will significantly impact existing parking patterns and traffic flow in the Triangle Lot. There are also personnel costs associated with the stackable parking option.

The future of the Dining Parkette program is still in discussion and being developed. This considered, there may be a forthcoming reduction in the number of parking spaces out of service as a result of changes to that program – there are currently 56 parking spaces out of service. Returning some of these 56 spaces to the parking inventory of the Riviera Village may impact Council direction on other suggested options to increase supply.

BRR #39

Page 1 of 4 ends

CITY OF REDONDO BEACH
Budget Response Report #39
June 14, 2022
Question:

What is the cost to design and install new streetscape furniture in Riviera Village?

Response:

Riviera Village contains the following streetscape furniture, most of which was installed about 12 years ago:
• 20 benches
• 40 trash receptacles
• 35 bicycle racks
The benches and bicycle racks remain in serviceable condition and their useful lifespan will extend for several more years. The trash receptacles are beyond their useful life and should be replaced in the near future. If the Council decides to replace the furniture, staff suggests two style options:

Steelcase Fixtures
Steelcase powder-coated steel fixtures, similar to the existing fixtures, come in a variety of colors and designs. The estimated costs to replace all fixtures with Steelcase are as follows:

Item Cost
Benches $35,000
Trash receptacles $68,000
Bicycle racks $14,000
Demo/removal $20,000
Installation $20,000
Design & Project Management $55,000
Total $212,000
BRR #39

Page 2 of 4 ends

Concrete Fixtures

Pre-cast concrete fixtures are a more durable alternative to steel fixtures and are common in coastal areas. Estimated costs to replace all fixtures with concrete furniture are as follows:

Item Cost
Benches $70,000
Trash receptacles $56,000
Bicycle racks $16,000
Demo/removal $20,000
Installation $30,000
Design & Project Management $70,000
Total $262,000

Photos of both types of furniture are included below. Alternatively, the City could set money aside for the replacement of streetscape furniture and work with the Riviera Village Business Improvement District to design and identify preferred replacement options and return to the City Council with a report on specific furniture types, styles, quantities, and cost estimates.

BRR #39

Page 3 of 4 ends

Steelcase Furniture
BRR #39

Page 4 of 4 ends

Pre-cast Concrete Furniture

BRR #40

Page 1 of 2 ends

CITY OF REDONDO BEACH
Budget Response Report #40
June 14, 2022
Question:

What is the status of the skate park installation at Pad 10? Response:

Due to multiple issues, the contractor for this project, Spohn Ranch, has delayed the installation of the skate park at Pad 10. Spohn Ranch cites material availability as well as financial obstacles for the delay. There are multiple paths that Council can consider moving forward.

On the material side, Spohn Ranch has indicated that their firm has experienced difficulty obtaining concrete and other building materials on other projects which has impacted their schedule on the City’s project. No estimate has been given for a start time for the work at Pad 10. Once started, Spohn Ranch estimates completion to take about 16 weeks.

This is due to long lead times (10 to 12 weeks) for structural foam.

To detail their current financial obstacles, Spohn Ranch provided the City with a letter on June 1st, indicating they are no longer able to complete the project for the $110,000 contract price due to hyper inflationary market conditions that have impacted the cost of fuel and construction materials.

Spohn Ranch indicated that, with current market conditions, the cost for current project completion would be $250,000 – approximately $140,000 greater than the amount appropriated to complete the Pad 10 skate park by Council on March 15th. If Council would like to increase the project appropriation, staff recommends a 20% contingency be added to any additional funding to allow for uncertainties related to constructability. The constructability issues revolve around the posted weight limit of the International Boardwalk, which may require that more and smaller concrete loads be transported to the job site as a result of weight restrictions in place on the International Boardwalk. This logistical adjustment may impact the price beyond the estimate provided by Spohn Ranch in their June 1st letter.

There are multiple paths that Council can direct staff to pursue. The proposed FY 2022- 23 CIP already includes a $30,000 appropriation for modifications to the Perry Park skate facility, in accordance with public input since it was installed. Council should consider an additional funding appropriation in the FY 2022-23 budget to complete the work at Pad 10 in the near term. Per the letter from Spohn Ranch, the minimum amount staff would recommend is an additional $140,000. At present, staff is unsure of the exact amount to recommend until the constructability issues are resolved and, as such, recommends the BRR #40

Page 2 of 2 ends

aforementioned 20% contingency be added, which would bring the total $168,000.

Council may also wish to direct staff to pursue completion of the project by enforcement of the current contract at the agreed upon terms, but this is certain to add delay and other costs and may not result in skatepark installation.

Additionally, the City Council has the opportunity to consider funding the second phase of the project (also described as the ultimate plan) that was approved as part of the Coastal Development Permit. The goal of moving forward with phase one of the pad 10 skatepark only, was to expedite construction of the park and allow for completion of the project this summer. Given the aforementioned delays, the Council may wish to build the complete project in one effort later this year. Spohn Ranch, provided a price of $281,000 for the ultimate buildout at the March 15th meeting and has indicated they will hold that price if a decision to go forward with it is made this month. That would require an appropriation of $171,000 above the $110,000 already under contract. If a decision could not be made now, they would revise their total price for the ultimate project upward to $311,500, an increase of $201,500 above the $110,000 already under contract. Staff recommends the 20% contingency be added to the phase two (ultimate plan) estimates, for the same reasons listed above. To be clear, the ultimate project scope with Spohn Ranch does not include the art work shown in prior skatepark drawings, as it was simply an illustration of what the facility could look like with public art.

Summarizing the issue, the Council may wish to enforce the current contract at no additional payment to Spohn Ranch, or appropriate additional monies per the following options:

Base Plan
Project
Ultimate Plan
(now)
Ultimate Plan
(Over 2 phases)
Spohn Ranch Change order $140,000 $171,000 $201,500
Contingency (~20%) total price $ 50,000 $ 56,000 $ 62,000 Total new appropriation $190,000 $227,000 $263,500
Under contract $110,000 $110,000 $110,000
Total Pad 10 Price $300,000 $337,000 $373,500
Funding for the additional costs/scope could be provided through available Harbor Uplands Funds, Subdivision Park Trust (Quimby) Funds, or Unallocated General Fund Balance. In order to move the project forward, staff will need to bring an amendment to the design build contract with Spohn Ranch back to Council for approval of the change order for the cost of the original scope of work, or prepare an amendment to the agreement to complete an expanded scope of work depending on the level of supplemental funding appropriated for the project. It should be noted that staff is continuing to install new railings around the Pad 10 location as part of the Pier/Harbor Railings Project recently awarded by the City Council.

BRR #41

Page 1 of 2 ends

CITY OF REDONDO BEACH
Budget Response Report #41
June 14, 2022
Question:

How do neighboring cities manage/administer credit card processing fees? Response:

The cost of doing business has increased significantly over time. The City has experienced large increases in credit card processing fees charged by banks, especially during the COVID-19 pandemic, as most agencies transitioned to online business portals in order to provide residents with a safe option to complete their business needs.

Types of credit card processing fees charged to agencies Discount rate
The discount rate is the percentage of a sale that goes towards paying credit card processing fees. A discount rate consists of interchange fees, assessment or service fees and markups from payment processors.

Interchange rate
The largest portion of the fee and rate pie is comprised of interchange fees, which are collected by credit card issuers. These fees are often presented as some percentage plus an additional fixed amount. Interchange fees vary widely based on a number of factors, including the credit card network (such as Visa or Mastercard), whether the card is a debit or credit card, how the payment is processed and the merchant category code.

Below is a list of the ranges of interchange rates charged by the major credit card networks. These ranges are based on publicly available information for credit cards; fees for debit cards are often lower. In addition to the card network, fees will vary based on the type of card, method of payment and Merchant Category Codes (MCC).

Credit Card Network Credit Card Interchange Fee Ranges
MasterCard 1.35% + $0.00 % to 3.25% + $0.10
Visa 1.15% +$0.25 to 2.70% + $0.10
Discover 1.56% to 2.40% + $0.10
American Express
(for OptBlue merchants) 1.43% to 3.0% + $0.10
BRR #41

Page 2 of 2 ends

Assessment fees
The assessment fee is a much smaller credit card processing fee, and is paid directly to the card network (Visa, MasterCard, Discover or American Express). These fees will also depend on a number of factors that differ from network to network. Some networks will charge higher rates for credit card versus debit card usage, while others may charge higher rates when the transaction volume is greater. Other incidental fees may arise from specific transactions being unique, such as foreign transaction fees.

The table below lists the minimum assessment fees for credit cards by network. These figures are based on limited publicly available information, so rates may vary. Rates may be higher if the card is manually keyed in or if there is an international transaction.

Credit Card Network Credit Card Assessment Fees
MasterCard 0.13% (for transactions under $1,000)

0.14% (for transactions of $1,000 or greater)
Visa 0.14%
Discover 0.13%
American Express
(for OptBlue merchants) 0.15%
Management of Fees by Neighboring Cities
The City is in the process of implementing a 3% charge for all credit card payments. The fee was approved by City Council via Resolution last year. A lack of software synergy between the City’s financial system (MUNIS), bank, and credit card companies has made fee implementation a difficult process. Staff expects to complete the project and begin charging the fee in the next few months.

Financial Services reached out to neighboring cities to inquire about how they offset credit card processing fees and received the following three (3) responses:
• City of Torrance - charges 2.13% to all credit card users. The charge was approved by City Council by Resolution.
• City of Hermosa Beach - charges 2.75% to most customers and a flat rate for certain specific types of charges. They plan to conduct a fee study in the near future which will determine any change to this rate.
• City of El Segundo - charges 2.75% for all credit card transactions.

BRR #42

Page 1 of 2 ends

CITY OF REDONDO BEACH
Budget Response Report #42
June 14, 2022
Question:

What would be required to transition City banking services from Bank of America to another competing bank?
Response:

If the City decided to transition the City’s banking services from Bank of America to another competing bank a Request for Qualifications (RFQ) or a Request for Proposal (RFP) process would have to be initiated. The request for proposal process is estimated to take 6-8 months to complete. Following selection of the new bank, the transition is estimated to take 3-6 months to fully implement and to cost approximately $50,000.

Various City Departments (City Treasurer, Financial Services and Information Technology) would need to be involved in the transition. The following services would need to be changed or updated:
• Positive Pay – a cash management service used by most banks to detect fraud • Automated Clearing House (ACH) – the primary system agencies use for electronic funds transfer (EFT)
• ACH block - prevents all ACH transactions from posting to accounts, allowing staff to review debits before posting
• Account reconciliations - process of verifying the City’s financial records and transactions in order to detect discrepancies
• Vaults and lock boxes
• Armored car services
• Internal Enterprise Resource Planning (ERP) systems - software used to manage day-to-day business activities such as accounting, procurement, project management, risk management and compliance, and supply chain operations Once implementation is complete, the City would need to contact all vendors who send EFT/ACH (Electronic Funds Transfer) payments and submit new banking forms to guarantee that there is no delay in receiving payments due to the City (i.e. Los Angeles County – Property Tax, State of California – Gas Tax and Sales Tax remittances etc.).

For out-going ACH/EFT the City would need to update Vendor accounts to make sure that all obligations are met timely with the new banking information. It would be recommended that both banking systems be run simultaneously for a period of time to test the new system and ensure all City bills are paid in a timely manner.

BRR #42

Page 2 of 2 ends

It is unknown if service levels will be the same. Online resources, customer service support and key bank staff are vital to the smooth operations of daily banking services provided to the City.

BRR #43

Page 1 of 4 ends

CITY OF REDONDO BEACH
Budget Response Report #43
June 14, 2022
Question:

What would be the cost to increase programming at the Perry Park and Anderson Park Senior Centers as well as the Teen Center, and what is the general cost to expand these facilities?
Response:

The Community Services Department oversees the programming and facility management of the City’s three senior centers located at Veterans, Perry and Anderson Parks, in addition to the Teen Center located at Perry Park. The forced closure of these facilities as a result of the COVID-19 pandemic caused a dramatic reduction in the level of programming that could be offered to the community. While programs and activities were shifted to be held virtually, there was still a substantial decrease of available programming for senior participants and younger participants due to the continued closure of the Teen Center.

Currently, all facilities are only open during times of active programming. Extending facility hours would allow additional programs for all ages to be scheduled through the User Pay program and these would be facilitated by contract instructors. This would provide flexibility in programming to satisfy community needs across a variety of interests and age groups along with the ability to adjust the programs being offered in an effort to be responsive as demand for various programs evolves over time.

Extending facility hours at a site would require staffing by a Recreation Leader and/or part-time positions, with estimated hourly pay rates of $17-19. These individuals would be responsible for opening and closing the facility, setting up and taking down tables and chairs, assisting instructors with access to materials and supplies, and providing a general level of oversight of the facility ensuring it is safe and properly maintained. Costs to extend operational hours vary at each site depending on current usage, and are based on a daily schedule of 8:00am – 7:00pm, excluding Sundays for the senior centers, and 8:00am – 3:00pm for the teen center, with weekends available by reservation only.

BRR #43

Page 2 of 4 ends

Anderson Park Senior Center Programming
Table 1: Anderson Park Senior Center Programming Hours vs. Expanded Hours Day Current Facility Hours Expanded Facility Hours
Sunday Closed Closed
Monday Closed 8:00am – 7:00pm (11 hours)
Tuesday 9:00am – 11:00am 8:00am – 9:00am (1 hour)
11:00am – 7:00pm (8 hours)
Wednesday 12:30pm – 4:00pm 8:00am – 12:30pm (4.5 hours) 4:00pm – 7:00pm (3 hours)
Thursday Closed 8:00am – 7:00pm (11 hours)
Friday 10:30am – 2:30pm 8:00am – 10:30am (2.5 hours)
2:30pm – 7:00pm (4.5 hours)
Saturday 9:00am – 11:30am 8:00am – 9:00am (1 hour)
11:30am – 7:00pm (7.5 hours)
The expanded schedule would add 54 additional operational hours, which would require a weekly increase of $918 when staffed by a Recreation leader with an hourly pay rate of $17. Annually, this would be $47,736.

Perry Park Senior Center Programming
Table 2: Perry Park Senior Center Programming Hours vs. Expanded Hours Day Current Facility Hours Expanded Facility Hours
Sunday Closed Closed
Monday Closed 8:00am – 7:00pm (11 hours)
Tuesday 10:00am – 12:00pm 8:00am – 10:00am (2 hours)
12:00pm – 7:00pm (7 hours)
Wednesday 9:30am – 3:30pm 8:00am – 9:30am (1.5 hours)
3:30pm – 7:00pm (3.5 hours)
Thursday 10:00am – 3:30pm 8:00am – 10:00am (2 hours)
3:30pm – 7:00pm (3.5 hours)
Friday 10:00am – 4:30pm 8:00am – 10:00am (2 hours)
4:30 – 7:00pm (2.5 hours)
Saturday 9:00am – 11:30am 8:00am – 9:00am (1 hour)
11:30am – 7:00pm (7.5 hours)
The expanded schedule would add 43.5 additional operational hours, which would require a weekly increase of $740 when staffed by a Recreation leader with an hourly pay rate of $17. Annually, this would be $38,454.

BRR #43

Page 3 of 4 ends

Perry Park Teen Center Programming
The Teen Center is currently closed, as a result of limited staff resources, but is normally open Monday through Friday from 3:00pm – 8:00pm. Weekends are recommended to remain available by reservation only as the facility is a popular option for private gatherings.

Table 3: Teen Center Pre-Pandemic Programming Hours vs. Expanded Hours Day Current Facility Hours Expanded Facility Hours
Sunday Reservation only Reservation only
Monday 3:00pm – 8:00pm 8:00am – 3:00pm (7 hours)
Tuesday 3:00pm – 8:00pm 8:00am – 3:00pm (7 hours)
Wednesday 3:00pm – 8:00pm 8:00am – 3:00pm (7 hours)
Thursday 3:00pm – 8:00pm 8:00am – 3:00pm (7 hours)
Friday 3:00pm – 8:00pm 8:00am – 3:00pm (7 hours)
Saturday Reservation only Reservation only
The availability of the facility for contracted classes during the expanded facility hours would require additional staff resources. Following past practice, this would be a parttime employee receiving an hourly wage of $19. This would require an additional weekly allocation of $665 for part-time salaries when staffed by a part-time resource. Annually, this would be $34,580.

In addition to the need for additional part-time staff to open and close the facilities, the expansion of programming would also require additional administrative resources to oversee and manage contracts, ensure the staff schedule is followed, and oversee the enhanced use of the facility including work orders and general maintenance. Therefore, this request would require an additional Recreation Coordinator position, estimated at $91,000 annually which includes salary and a full benefits package.

Collectively, the expansion of programming at the Anderson and Perry Park Senior Centers as well as at the Perry Park Teen Center would cost approximately $211,770.

Table 4: Collective Resource Needs for Expanded Programming Facility/Resource Estimated Cost
Anderson Park Senior Center $47,736
Perry Park Senior Center $38,454
Perry Park Teen Center $34,580
Recreation Coordinator $91,000
TOTAL $211,770
BRR #43

Page 4 of 4 ends

Facility Expansion
On average, recreational facilities (per current construction material and labor expenses) are estimated to cost $1,000 per square foot to build. For estimation purposes, see Table 5 below, is a listing of each facility’s current square footage and an estimation of costs to add a second level, ultimately doubling the space. A structural analysis has not been completed on any of the facilities nor a comprehensive facility review to determine whether the existing buildings can support a second level.

Table 5: Estimate of Facility Expansion
Facility Current ft2 Expansion Estimate
@ $1,000 per ft2
Anderson Park Senior Center 3,600 $3,600,000
Perry Park Senior Center 1,500 $1,500,000
Teen Center 4,000 $4,000,000
BRR #44