Cities Index.
Cost Quote JLee Engineering

Redondo Beach City Council
July 19, 2022

Document
Cost Quote JLee Engineering
Meeting
July 19, 2022
Body
Redondo Beach City Council
Pages
2
Original file
469 KB
Text extracted from the city's file for reading and search. Open the original on redondo.legistar1.com. That file is the official record.

City of Redondo Beach (Plan Check Services for South Bay Galleria Mall Renovation 7/11/2022)

Page 1 ends

430 S. Garfield Ave., Suite 301, Alhambra, CA 91801 ● Phone: (626) 284-8906 DATE: July 11, 2022
TO: Lina Portolese, Senior Management Analyst
City of Redondo Beach
Community Development Department / Planning Division
SUBJECT: GALLERIA MALL RENOVATION PROJECT PLAN CHECK PROPOSAL Dear Ms. Lina Portolose:

JLee Engineering, Inc. (JLee Engineering) is pleased to submit this cost proposal to provide plan check services for the South Bay Galleria Mall Renovation Project for the City of Redondo Beach.

We have extensive experience in performing high profile and complex projects similar to South Bay Galleria Mall Renovation Project for our current client agencies. We can provide high quality and timely delivery of plan check services for this project.

Our proposal for the plan check services based on our understanding of the project are as follows:

I. Project Description (South Bay Galleria Mall Renovation):

A. General Description (Per attached “RFC Galleria Project Plan Check 07 01 2022”) • Renovation of the existing mall and incorporating the existing Nordstrom’s building into the mall building property.
• Conversion of the construction type to Type II-B.
• Revision of interior finishes, adjusting the storefront line of various tenant spaces, demising the Nordstrom’s space, and converting the concourse area to an interior, un-conditioned space. • Renovation of the basement, the parking structure, and associated site work which includes adding an open-air plaza and the construction of a bermed area along the north elevation along Artesia Boulevard.

B. Project Valuation: $55,000,000
C. Project Summary and Building Qualifications (See “RFC Galleria Project Plan Check 07 01 2022”) II. Proposal:

A. Scope of Services:

1. Provide plan check services (Building, MEP, and Grading) for the South Bay Galleria Mall Renovation Project.

B. Services Delivery:

1. Plan review services are from the initial submittal and up to plan approval.

City of Redondo Beach (Plan Check Services for South Bay Galleria Mall Renovation 7/11/2022)

Page 2 ends

430 S. Garfield Ave., Suite 301, Alhambra, CA 91801 ● Phone: (626) 284-8906

2. All plan check services will be delivered timely based on the type of reviews needed.

3. Plan check timelines will depend on the project plan packages. The estimated projected plan check timelines are as follows:
• Initial Reviews: 3 to 4 weeks
• Rechecks: 2 to 3 weeks
C. Cost Proposal:

1. The proposal fee is estimated based on the limited information contained in the “RFC Galleria Project Plan Check 07 01 2022”.

2. Hourly Rates: Building, MEP, and Grading Review: $140.00

3. The estimated plan check hours are approximately 1,860 hours. • The estimated plan check fee for JLee Engineering is $260,400 (1,860 hours x 140/hour).

4. The fee proposal for the plan check services is not to exceed $260,000.

We are looking forward to the opportunity to provide plan check services for the South Bay Galleria Mall Renovation project.

If you have any questions or comments, please contact Jae Lee at (626) 284-8906 or [email protected] at your convenience.

Sincerely,
Jae Lee, PE, CPE, CASP
President
Attachment: “RFC Galleria Project Plan Check 07 01 2022” Redondo Beach– Request for Cost Quote P a g e | 1
South Bay Galleria Mall Renovation Project Plan Check

REQUEST FOR COST PROPOSAL
Issuance Date: July 1, 2022 Response Deadline: July 11, 2022 Purpose
The City of Redondo Beach seeks cost proposals for plan check services of the following project.

Project
South Bay Galleria Mall Renovation
The project entails the renovation of the existing mall and incorporating the existing Nordstrom’s building into the mall building property. Additionally, it involves conversion of the construction type to Type II-B. Work includes revision of interior finishes, adjusting the storefront line of various tenant spaces, demising the Nordstrom’s space, and converting the concourse area to an interior, un-conditioned space. Work also includes renovation of the basement, the parking structure, and associated site work which includes adding an open-air plaza and the construction of a bermed area along the north elevation along Artesia Boulevard.

PROJECT VALUATION: $55,000,000
Redondo Beach– Request for Cost Quote P a g e | 2
South Bay Galleria Mall Renovation Project Plan Check
Cost proposal
The City seeks a summary cost proposal for the project as noted above. The proposal shall include projected plan check timelines, projected hours, hourly rate, and total cost for the services from initial plan review to full approval.

Deadline
Submit proposal in PDF format by Monday July 11, 2022 to [email protected] with subject line “Galleria Mall Renovation Project Plan Check Cost Proposal.” The City can only accept electronic proposals at this time. If the file size is over 15MB, please email a link from a file sharing website (such as Dropbox).

Any questions may be directed to Lina Portolese, Senior Management Analyst [email protected].

← All documents from this meeting